Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
Langberg, Joshua M; Epstein, Jeffery N; Girio, Erin L; Becker, Stephen P; Vaughn, Aaron J; Altaye, Mekibib
2011-06-01
This study evaluated the homework functioning of middle school students with ADHD to determine what aspects are most predictive of school grades and the best source (e.g., parents or teachers) for obtaining this information. Students with ADHD in grades 5-8 ( N = 57) and their parents and teachers completed the Children's Organization Skills Scales (COSS) to measure materials organization, planning, and time-management, and parents completed the Homework Problems Checklist (HPC) to examine homework completion and homework materials management behaviors. Regression analyses revealed that parent-rated homework materials management and teacher-rated memory and materials management were the best predictors of school grades. These findings suggest that organization of materials is a critical component of the homework completion process for students with ADHD and an important target for intervention. Teachers were the best source of information regarding materials organization and planning, whereas parents were a valuable source of information for specific homework materials management problems.
Langberg, Joshua M.; Epstein, Jeffery N.; Girio, Erin L.; Becker, Stephen P.; Vaughn, Aaron J.; Altaye, Mekibib
2013-01-01
This study evaluated the homework functioning of middle school students with ADHD to determine what aspects are most predictive of school grades and the best source (e.g., parents or teachers) for obtaining this information. Students with ADHD in grades 5–8 (N = 57) and their parents and teachers completed the Children’s Organization Skills Scales (COSS) to measure materials organization, planning, and time-management, and parents completed the Homework Problems Checklist (HPC) to examine homework completion and homework materials management behaviors. Regression analyses revealed that parent-rated homework materials management and teacher-rated memory and materials management were the best predictors of school grades. These findings suggest that organization of materials is a critical component of the homework completion process for students with ADHD and an important target for intervention. Teachers were the best source of information regarding materials organization and planning, whereas parents were a valuable source of information for specific homework materials management problems. PMID:23577045
MDOT Materials Laboratories : Environmental Management Plan
DOT National Transportation Integrated Search
2012-06-01
The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including...
USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site
The site designation for the Western and Central Long Island Sound disposal sites requires the completion of a Dredged Material Management Plan (DMMP) and EPA to conduct an annual review of progress toward completion of the DMMP.
U.S. Navy Advanced Receiving: A Better Approach to the Basics.
1987-04-01
the Navy and DLA should begin now to plan for electronic interchange of data between their inventory management systems. This would eliminate the...labor savings from work simplification, improved material handling, and better work load planning 0 Material savings from reduced packaging and use of... planning purposes, source distribution managers use the following equa- tion to determine maximum consolidation time: Maximum consolidation time = 21
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
AAFES Shopping Center Environmental Assessment
2009-08-01
Plan H2S Hydrogen Sulfide SO2 Sulfur Dioxide HWMP Hazardous Waste Management Plan SMW Strategic Missile Wing ICBM Intercontinental Ballistic Missile...the no-action alternative. Land Management and Use. A waiver would be needed prior to construction to change the land use designation from Open...occur under the no-action alternative. Hazardous Materials and Waste Management . No changes to hazardous materials or waste streams would occur
40 CFR 262.105 - What must be included in the laboratory environmental management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...
40 CFR 262.105 - What must be included in the laboratory environmental management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...
40 CFR 262.105 - What must be included in the laboratory environmental management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...
40 CFR 262.105 - What must be included in the laboratory environmental management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...
2005-03-01
Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.
Dredged Material Management in Long Island Sound
Information on Western and Central Long Island Sound Dredged Material Disposal Sites including the Dredged Material Management Plan and Regional Dredging Team. Information regarding the Eastern Long Island Sound Selected Site including public meetings.
Code of Federal Regulations, 2014 CFR
2014-07-01
... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...
USDOT guidance summary for connected vehicle deployments : safety management.
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to safety management plan for the CV Pilots DeploymentConcept Development Phase. This guidance provides key concepts and references in developing the SafetyManagement Plan in Task 4, lists relevant ...
Research Perspectives for Material Requirements Planning Systems. Paper No. 434.
ERIC Educational Resources Information Center
Berry, W. L.; Whybark, D. Clay
Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…
40 CFR 262.214 - Laboratory management plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...
40 CFR 262.214 - Laboratory management plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...
40 CFR 262.214 - Laboratory management plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...
Liu, Jie; Guo, Liang; Jiang, Jiping; Jiang, Dexun; Liu, Rentao; Wang, Peng
2016-06-05
In the emergency management relevant to pollution accidents, efficiency emergency rescues can be deeply influenced by a reasonable assignment of the available emergency materials to the related risk sources. In this study, a two-stage optimization framework is developed for emergency material reserve layout planning under uncertainty to identify material warehouse locations and emergency material reserve schemes in pre-accident phase coping with potential environmental accidents. This framework is based on an integration of Hierarchical clustering analysis - improved center of gravity (HCA-ICG) model and material warehouse location - emergency material allocation (MWL-EMA) model. First, decision alternatives are generated using HCA-ICG to identify newly-built emergency material warehouses for risk sources which cannot be satisfied by existing ones with a time-effective manner. Second, emergency material reserve planning is obtained using MWL-EMA to make emergency materials be prepared in advance with a cost-effective manner. The optimization framework is then applied to emergency management system planning in Jiangsu province, China. The results demonstrate that the developed framework not only could facilitate material warehouse selection but also effectively provide emergency material for emergency operations in a quick response. Copyright © 2016. Published by Elsevier B.V.
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
The Course Development Plan: Macro-Level Decisions and Micro-Level Processes
ERIC Educational Resources Information Center
Franker, Karen; James, Dennis
2016-01-01
A key step in distance learning project management is the creation of a course development plan. The plan should account for decisions related to materials, curriculum, delivery methods, staffing, technology applications, resources, reporting lines, and project management--issues that may require administrator involvement and support, particularly…
Adaptive management: a paradigm for remediation of public facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B
2009-01-01
Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less
40 CFR 60.2065 - What should I include in my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What should I include in my waste management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., plastics, glass, batteries, or metals; or the use of recyclable materials. The plan must identify any...
40 CFR 60.2065 - What should I include in my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What should I include in my waste management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., plastics, glass, batteries, or metals; or the use of recyclable materials. The plan must identify any...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What should I include in my waste management plan? 60.2901 Section 60.2901 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What should I include in my waste management plan? 60.2901 Section 60.2901 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... management plan must include consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan... place, the costs of additional measures, the emissions reductions expected to be achieved, and any other...
From waste to sustainable materials management: Three case studies of the transition journey.
Silva, Angie; Rosano, Michele; Stocker, Laura; Gorissen, Leen
2017-03-01
Waste policy is increasingly moving on from the 'prevention of waste' to a 'sustainable materials policy' focused agenda recognising individual wastes as a resource. In order to comparatively analyse policy developments in enhanced waste management, three case studies were selected; San Francisco's Zero Waste Program, Flanders's Sustainable Materials Management Initiative and Japan's Sound Material-Cycle Society Plan. These case studies were chosen as an opportunity to investigate the variety of leading approaches, governance structures, and enhanced waste policy outcomes, emerging globally. This paper concludes that the current transitional state of waste management across the world, is only in the first leg of the journey towards Circular Economy closed loop production models of waste as a resource material. It is suggested that further development in government policy, planning and behaviour change is required. A focus on material policy and incorporating multiple front runners across industry and knowledge institutions are offered as potential directions in the movement away from end-pipe land-fill solutions. Copyright © 2016 Elsevier Ltd. All rights reserved.
Information systems for material flow management in construction processes
NASA Astrophysics Data System (ADS)
Mesároš, P.; Mandičák, T.
2015-01-01
The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.
Beneficial Uses of Dredged Material Case Study: San Francisco Bay Region
A major interagency, regional planning effort led to the development of the Long-Term Management Strategy and other planning programs in the San Francisco Bay area. These programs incorporate beneficial uses of dredged material into local projects.
Producing Distance Learning Materials: Cash and Other Constraints.
ERIC Educational Resources Information Center
Whitehead, Don J.
In order to develop a financial plan for and identify constraints on the production of distance learning materials, a total human resources development (HRD) plan must be produced, and endorsed by the highest level of management. The HRD plan sets out the human resources needed to secure the organization's future in terms of people and their…
2007-10-01
National Risk Management Research Labo- ratory (NRML), National Exposure Research Laboratory (NERL), and National Center for Environmental Assessment ...Clean Water State Revolving Fund CZMA. . .. .. ..Coastal Zone Management Act EA... .. .. .. .. .environmental assessment EIS. . .. .. .. .. .environmental...proponents will in fact be conducting a National Environmental Policy Act assessment of alternatives. Beneficial Use Planning Manual Beneficial Use
Managing Academe's Hazardous Materials.
ERIC Educational Resources Information Center
Thompson, Fay
1991-01-01
Those responsible for planning and management of colleges and universities must plan comprehensively for hazardous waste disposal. Federal and state regulations are increasing, landfill area is becoming scarce, and incineration costs are rising fast. High-level institutional commitment to a sound campus environment policy is essential. (MSE)
The Accommodation Operation. Accommodation Management Module. Operational Management Programme.
ERIC Educational Resources Information Center
Chapman, Janet
This module on accommodation operation is intended to help supervisors or managers achieve a balance in the day-to-day running of the premises and plan for a smooth and successful future. Much of the material is concerned with the housekeeping aspects of accommodation management. The material is presented in a self-instructional format in seven…
Recommendations for Emergency Management Planning for School Facilities.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
Numerous events, such as hurricanes, floods, and tornadoes, constitute a natural disaster for public schools. Human-caused disasters include hazardous-material emergencies, civil riots, fires, and nuclear accidents. This document contains emergency-management planning guidelines, developed by the Texas Education Agency, to help local school…
Government Materials on Enrollment Management and Planning in Higher Education: A Resource Guide.
ERIC Educational Resources Information Center
Lewis, David G.
The guide is intended to provide admissions directors, academic deans, institutional planning officers, and faculty with access to government sources of information concerning college enrollment management. Sections provide information on: using the guide; additional government document information sources; using government documents; acquiring…
A Cyclical Plan for Using Study Strategies.
ERIC Educational Resources Information Center
Hayes, David A.; Alvermann, Donna E.
1984-01-01
A cyclical plan for studying that takes into account information processing strategies and their effective management by students consists of (1) specifying study purposes, (2) previewing the materials, (3) proceeding through the task incrementally, and (4) connecting the content to be learned to other knowledge about the material studied. Setting…
Test Area C-74 Complex Final Range Environmental Assessment at Eglin Air Force Base, Florida
2015-08-21
LAWS, REGULATIONS, AND POLICIES ACRONYMS AND ABBREVIATIONS ACHP Advisory Council on Historic Preservation ACM asbestos -containing materials...agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This plan establishes procedures for the Eglin AFB...facility asbestos management program. It contains the policies and procedures used in controlling the health hazards created by asbestos containing
[A medical consumable material management information system].
Tang, Guoping; Hu, Liang
2014-05-01
Medical consumables material is essential supplies to carry out medical work, which has a wide range of varieties and a large amount of usage. How to manage it feasibly and efficiently that has been a topic of concern to everyone. This article discussed about how to design a medical consumable material management information system that has a set of standardized processes, bring together medical supplies administrator, suppliers and clinical departments. Advanced management mode, enterprise resource planning (ERP) applied to the whole system design process.
Cash Management Improvement in the Navy Stock Fund.
1986-03-01
Command, Aviation Supply Office, Fisca.l Ya 1,985 Material Budget Execution Plan , September 1984. 44 Naval Supply Systems Command, Code 60... Material . .. .. .. ... 57 3. Inventory Augmentation Appropriated Funds. .. .. ... 57 I V. CURRENT NAVY STOCK FUND CASH MANAGEMENT PRACTICES . ..59 A...Control Center, Mechanicsburg, Pennsylvania 13 * Fleet Material Support Office, Mechanicsburg, Pennsylvania Aviation Supply Off Ice, Philadelphia
2011-10-01
September 30, 2012 and 2011 Objective: Determine whether KPMG complied, in all material respects, with U.S. generally accepted government auditing...reported the same 13 material internal control weaknesses as the previous year. These pervasive and longstanding financial management issues...Defense Contract Management Agency’s Investigation and Control of Nonconforming Materials (D2011-D000CD-0264.000) Objective: Examine the Defense
2002-11-08
Financial Management November 8, 2002 Office of the Inspector General of the Department of Defense Naval Air Systems Command Financial Reporting of...from... to) - Title and Subtitle Financial Management: Naval Air Systems Command Financial Reporting of Non-Ammunition Operating Material and...This report is the first in a series of planned reports and discusses the financial reporting of non-ammunition operating materials and supplies
Integrating Bill of Materials Data Into the Armys Enterprise Resource Planning Systems
2016-05-17
management with a concentration in human resources from Virginia State University and an MBA from Averett University, and he is a public policy...57 Army Sustainment November–December 2015 As the Army moves to an en-terprise resource planning... Resource Planning Systems By LeQuan M. Hylton TOOLS The fielding of Global Combat Support System–Army has changed the way the Army manages bill
40 CFR 60.3012 - What should I include in my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What should I include in my waste management plan? 60.3012 Section 60.3012 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials...
40 CFR 60.3012 - What should I include in my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What should I include in my waste management plan? 60.3012 Section 60.3012 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials...
40 CFR 60.3012 - What should I include in my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What should I include in my waste management plan? 60.3012 Section 60.3012 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials...
40 CFR 60.3012 - What should I include in my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What should I include in my waste management plan? 60.3012 Section 60.3012 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials...
Los Alamos National Laboratory emergency management plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramsey, G.F.
1998-07-15
The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents,more » transportation accidents, electrical accidents, and natural disasters.« less
2006-04-01
3-21 TPA060050033/TYNDALLINRMPEAFINAL.DOC VI Acronyms and Abbreviations ACM asbestos-containing materials ...Inventory FONPA Finding of No Practicable Alternative FONSI Finding of No Significant Impact HAZMO Hazardous Materials Management Office ICRMP...land surface (bls) by unconsolidated sands and clayey sands deposited since the Pliocene age. This material is relatively permeable and is underlain
This SMMP is intended to provide management and monitoring strategies for disposal in the Mouth of Columbia River- Deep and Shallow Ocean Dredged Material Disposal Sites on the border of Oregon and Washington.
This SMMP is intended to provide management and monitoring strategies for disposal in the Los Angeles/Long Beach (LA-2), Newport (LA-3) and San Diego (LA-5) Ocean Dredged Material Disposal Sites in California.
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
Renschler, Lauren A; Terrigino, Elizabeth A; Azim, Sabiya; Snider, Elsa; Rhodes, Darson L; Cox, Carol C
2016-06-01
A brief emergency planning educational presentation was taught during work hours to a convenience sample of employees of various workplaces in Northern Missouri, USA. Participants were familiarized with details about how an emergency plan is prepared by management and implemented by management-employee crisis management teams - focusing on both employee and management roles. They then applied the presentation information to assess their own organization's emergency preparedness level. Participants possessed significantly (p < 0.05) higher perceptions of their organization's level of emergency preparedness than non-participants. It is recommended that an assessment of organizational preparedness level supplement emergency planning educational presentations in order to immediately apply the material covered and encourage employees to become more involved in their organization's emergency planning and response. Educational strategies that involve management-employee collaboration in activities tailored to each workplace's operations and risk level for emergencies should be implemented.
Business plans--tips from the toolkit 6.
Steer, Neville
2010-07-01
General practice is a business. Most practices can stay afloat by having appointments, billing patients, managing the administration processes and working long hours. What distinguishes the high performance organisation from the average organisation is a business plan. This article examines how to create a simple business plan that can be applied to the general practice setting and is drawn from material contained in The Royal Australian College of General Practitioners' 'General practice management toolkit'.
Test Area C-62 Final Range Environmental Assessment at Eglin Air Force Base, Florida
2015-06-05
requirements to submit with EPCRA reports. Federal agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This...plan establishes procedures for the Eglin Air Force Base (AFB) facility asbestos management program. It contains the policies and procedures used in...controlling the health hazards created by asbestos containing materials (ACM), and the procedures used in ACM removal required to protect the health
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
Biosafety practices associated with potential agents of biocrime and biowarfare.
Burnett, LouAnn C
2006-12-01
Conducting research in a manner that guards against theft and intentional misuse of biological materials requires a process of hazard identification and risk assessment to most effectively identify and implement a risk management plan. Procedures describing physical security, personnel reliability, and material control and accountability define a security plan for this type of research.
Estimates of wood energy demand for residential use in Alaska: an update
Jean M. Daniels; Michael D. Paruszkiewicz
2016-01-01
Efforts to amend the Tongass National Forest Land Management Plan have necessitated the development of several management scenarios to assist with planning efforts. One scenario focuses on increasing the utilization of sawmill residues and low-grade material as feedstock for expanding biomass energy markets. The development of a biomass industry is viewed as a solution...
A Planning Process and the Integration of Institutional Research.
ERIC Educational Resources Information Center
Spencer, R.; And Others
Consisting mainly of charts, graphs, and lists, this publication presents materials used in the Delaware County Community College (DCCC) planning and institutional research processes. Guidelines for establishing DCCC mission, goals, objectives, and management by objectives performance standards relative to planning changes, instructional programs,…
Software Management Environment (SME) release 9.4 user reference material
NASA Technical Reports Server (NTRS)
Hendrick, R.; Kistler, D.; Manter, K.
1992-01-01
This document contains user reference material for the Software Management Environment (SME) prototype, developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division (FDD) of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides an overview of the SME, a description of all functions, and detailed instructions concerning the software's installation and use.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less
Managing Materials and Wastes for Homeland Security Incidents
To provide information on waste management planning and preparedness before a homeland security incident, including preparing for the large amounts of waste that would need to be managed when an incident occurs, such as a large-scale natural disaster.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barariu, G.
2008-07-01
The paper presents the progress of the Decontamination Plan and Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor VVR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for VVR-S decommissioning was also elaborated. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facilitymore » at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the IAEA assistance. Environmental concerns are a part of the radioactive waste management strategy. In conclusion: The current version 8 of the Draft Decommissioning Plan which include the Integrated concept of Decontamination and Decommissioning and Radwaste Management, reflects the substantial work that has been incorporated by IFIN-HH in collaboration with SITON, which has resulted in substantial improvement in document The decommissioning strategy must take into account costs for VVR-S Reactor decommissioning, as well as costs for much needed refurbishments to the radioactive waste treatment plant and the Baita-Bihor waste disposal repository. Several improvements to the Baita-Bihor repository and IFIN-HH waste treatment facility were proposed. The quantities and composition of the radioactive waste generated by VVR-S Reactor dismantling were again estimated by streams and the best demonstrated practicable processing solution was proposed. The estimated quantities of materials to be managed in the near future raise some issues that need to be solved swiftly, such as treatment of aluminum and lead and graphite management. It is envisaged that these materials to be treated to Subsidiary for Nuclear Research (SCN) Pitesti. (authors)« less
Job Creation through Entrepreneurship. Instructional Package.
ERIC Educational Resources Information Center
Chippewa Valley Technical Coll., Eau Claire, WI.
This document contains materials for teachers and students for a 12-session workshop course on entrepreneurship and small business management. Lesson plans for the 12 sessions cover the following topics: business plan and goals; planning, goal setting, and identifying your business; financing; physically setting up business; advertising;…
Information citizens can obtain under the Emergency Planning and Community Right-to-Know Act and the Clean Air Act's risk management program. How to find out about release notifications, material safety data sheets, response plans, and hazard vs. risk.
ERIC Educational Resources Information Center
Fisk, George; Nehmadi, David
A system has been developed to identify, locate and evaluate learning materials for use in an external degree program in management at Syracuse University. It consists of five elements, each of which is a set of physical objects or documents: the interaction of these sets transforms the demand for learning materials into an output of retrieved…
Revised Class IV Planning Factors
1997-01-01
including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the...1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. 1. AGENCY...October 1996 meeting. 14. SUBJECT TERMS 15. NUMBER OF PAGES supply management mobilization 26 planning factors 16. PRICE CODE construction materials 17
ERIC Educational Resources Information Center
Anderson, Nancy; And Others
This is one of a set of five handbooks compiled by the Northwest Regional Educational Laboratory that describes the processes for planning and operating a total experience-based career education (EBCE) program. Processes and material are those developed by the original EBCE model--Community Experience in Career Education (CE)2. The area of…
77 FR 47399 - Funding Opportunity: Tribal Self-Governance Program; Planning Cooperative Agreement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-08
... timely and efficient. Planning helps to identify issues in advance and ensures that the Tribe is fully... and financial management capability. Applicants are required to submit complete annual audit reports... the Planning Cooperative Agreement, the Tribe has had no uncorrected significant and material audit...
76 FR 12943 - Mid-Atlantic Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... Strategic Planning Project. The roadmap will detail how the Council solicits stakeholder input and then incorporates that input into a vision and strategic plan that will guide Council Actions in the future. Any briefing materials will be posted to the Council's Visioning and Strategic Planning Project Web site: http...
Y-12 Integrated Materials Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alspaugh, D. H.; Hickerson, T. W.
2002-06-03
The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclearmore » material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.« less
Entrepreneurship Education Materials.
ERIC Educational Resources Information Center
Muzzo, John F., Ed.; And Others
This annotated bibliography is intended to provide instructors and trainers with a variety of materials that may be used to design or supplement a self-employment/small business management training program. The materials listed include lesson plans, handbooks, workbooks, textbooks, tests, test keys, instruction guides, videocassettes, pamphlets,…
Emergency management logistics must become emergency supply chain management.
Young, Richard R; Peterson, Matthew R
2014-01-01
Much has been written about how emergency management (EM) needs to look to the future regarding issues of resource management (monetary, human, and material). Constraints on budgets are ongoing and the staffing of emergency response activities is often difficult because volunteers have little to no training. The management of material resources has also been a challenge because 1) the categories of material vary by the type of emergency, 2) the necessary quantities of material are often not located near the ultimate point of need, and 3) the transportation assets are rarely available in the form and quantity required to allow timely and effective response. The logistics and resource management functions of EM (what we refer to as EM logistics) have been largely reactive, with little to no pre-event planning for potential demand. We applied the Supply Chain Operational Reference (SCOR) model to EM logistics in an effort to transform it to an integrated and scalable system of physical, information, and financial flows into which are woven the functions of sourcing, making, delivering, and returning, with an overarching planning function that transcends the organizational boundaries of participants. The result is emergency supply chain management, which embraces many more participants who share in a larger quantity of more useful information about the resources that need to be deployed when responding to and recovering from emergency events.
Supply Management Analysis of the Chilean Navy Acquisition System
2014-12-01
52 LIST OF REFERENCES Armada de Chile, N. (1986). Manual de Logistica de la Armada de Chile [Manual of logistics of the Chilean Navy]. Chile... transportation • Quality control • Demand and supply planning • Receiving, materials handling, and storage 11 • Material or inventory control...Order purchasing • Production planning, scheduling, and control • Warehousing and distribution • Shipping • Outbound transportation • Customer
NASA Technical Reports Server (NTRS)
Yarbrough, Katherine
2015-01-01
During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.
Basic Training Course/Emergency Medical Technician (Second Edition). Instructor's Lesson Plan.
ERIC Educational Resources Information Center
National Highway Traffic Safety Administration (DOT), Washington, DC.
This document containing instructor lesson plans is one of three prepared to update a basic training program for emergency medical technicians (EMTs). (A course guide containing planning and management information and a study guide are available separately.) Material covers all emergency medical techniques currently considered to be within the…
Planning crops and developing propagation protocols [Chapter 3
Douglass F. Jacobs; Kim M. Wilkinson
2009-01-01
Crop planning is an important but often neglected aspect of successful nursery management. Crop planning enables proper scheduling of the necessary time, materials, labor, and space to produce crops. Many painstaking details, such as the careful design of nursery facilities; working with clients; collecting and propagating seeds and cuttings; and making improvements in...
Washington State Community College Capital Master Plan, 1985-91. Management Summary.
ERIC Educational Resources Information Center
Washington State Board for Community Coll. Education, Olympia.
Designed for Washington State's decision makers and the trustees and administrators of the community college system, this report extracts information from the community college system's 1985-87 capital budget request and 1985-91 capital master plan to provide a brief description of the budget and plan. Introductory material discusses the…
NASA Astrophysics Data System (ADS)
The U.S. Integrated Ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and Communications (DMAC∥ component. The deadline for receipt of comments has been extended to 18 November 2003. The plan can be found at http://www.dmac.ocean.us/dacsc/imp_plan.jsp. The plan was developed by the DMAC Steering Committee, which includes representatives from federal and state agencies, private industry, and academia. This committee was tasked by Ocean.US (the national office for IOOS) with the preparation of a detailed, phased DMAC implementation plan, and initial oversight of its implementation. The scope of the plan includes the IOOS DMAC infrastructure, data archive and access, and basic information products needed for assessing the availability and quality of data within IOOS. Four expert teams (Data Transport, Metadata and Data Discovery, Data Archive and Access, Applications and Products), and two outreach teams (Data Facilities Management, and User Outreach), were assembled to assist in developing material for the plan.
Multi-Material Recycling Manual. The Keep America Beautiful System. Revised Edition.
ERIC Educational Resources Information Center
1987
Solid waste management ranks third after schools and roads in most municipal budgets in the United States. Maximizing the separation of recyclable materials that can be reused may offer the highest priority and best use of our waste and should receive high priority in a solid waste management plan. This manual deals with the recycling of material…
Geotechnical Asset Management Plan : Technical Report
DOT National Transportation Integrated Search
2017-06-30
Geotechnical assets which include rock and soil slopes, retaining walls, and material sites support and protect the Department's pavements and bridges, and provide the material from which these assets are built. They are the front line of the...
APPLICATION OF THE US DECISION SUPPORT TOOL FOR MATERIALS AND WASTE MANAGEMENT
EPA¿s National Risk Management Research Laboratory has led the development of a municipal solid waste decision support tool (MSW-DST). The computer software can be used to calculate life-cycle environmental tradeoffs and full costs of different waste management plans or recycling...
Selected Audio-Visual Materials for Consumer Education.
ERIC Educational Resources Information Center
Oppenheim, Irene
This monograph provides an annotated listing of suggested audiovisual materials which teachers should consider as they plan consumer education programs. The materials are divided into a general section on consumer education and a section on specific topics, such as credit, decision making, health, insurance, money management, and others. The…
1993-09-01
1987; Westerdahl and Skogerboe 1982). ri. II L I-AINFALL ~ - n A0 J `-LOW CONTROLLERSfL I ý’-DRAIN OUTL-ET SCALE 10 2m Figure 3-8. Schematic of WES...Agency. (1986). "Quality criteria for water 1986," EPA 440/5-86-001, Washington, DC. Westerdahl , H. E., and Skogerboe, J. G. (1982). "Realistic
Berkeley Lab - Materials Sciences Division
? Click Here! Resources for MSD Safety MSD Safety MSD's Integrated Safety Management Plan [PDF] Safety culture and policies at MSD MSD0010: Integrated Safety Management: Principles and Case Studies Calendar for MSD classes on Integrated Safety Management MSD0015 Handout - Waste Briefing Document [PDF] Waste
Nursery management [Chapter 16
Kim M. Wilkinson
2009-01-01
This handbook provides an overview of the factors that go into starting and operating a native plant nursery. Management includes all aspects of working with plants in all their phases of growth as described in Chapter 3, Crop Planning and Developing Propagation Protocols. Management also includes working with the community; organizing materials and infrastructure;...
1979-08-21
Appendix s - Outline and Draft Material for Proposed Triservice Interim Guideline on Application of Software Acceptance Criteria....... 269 Appendix 9...AND DRAFT MATERIAL FOR PROPOSED TRISERVICE INTERIM GUIDELINE ON APPLICATION OF SOFTWARE ACCEPTANCE CRITERIA I I INTRODUCTION The purpose of this guide...contract item (CPCI) (code) 5. CPCI test plan 6. CPCI test procedures 7. CPCI test report 8. Handbooks and manuals. Al though additional material does
EPA Sustainable Materials Management Program Strategic Plan for Fiscal Years 2017 – 2022
Covers fiscal years 2017 through 2022, and represents the collective thinking of EPA staff and management across the country, as well as input from many stakeholders, including states, industry, and non-governmental organizations.
1987-04-01
managerial talent and management style and behaviour on the basis of fixed and practised managerial principles. However, the material aspect, that is...motivation is encouraged by - immaterial incentives extrinsic motivation - material incentives on the one hand and by - management style and bihaviour...Logistics Management & Information Programs 26 Bid Victor Division 75996 Pans Armees NASA Headquarters (Code NIT) France Washington DC 20546 USA
Challenges in disposing of anthrax waste.
Lesperance, Ann M; Stein, Steve; Upton, Jaki F; Toomey, Chris
2011-09-01
Disasters often create large amounts of waste that must be managed as part of both immediate response and long-term recovery. While many federal, state, and local agencies have debris management plans, these plans often do not address chemical, biological, and radiological contamination. The Interagency Biological Restoration Demonstration's (IBRD) purpose was to holistically assess all aspects of an anthrax incident and assist in the development of a plan for long-term recovery. In the case of wide-area anthrax contamination and the follow-on response and recovery activities, a significant amount of material would require decontamination and disposal. Accordingly, IBRD facilitated the development of debris management plans to address contaminated waste through a series of interviews and workshops with local, state, and federal representatives. The outcome of these discussions was the identification of 3 primary topical areas that must be addressed: planning, unresolved research questions, and resolving regulatory issues.
Challenges in Disposing of Anthrax Waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lesperance, Ann M.; Stein, Steven L.; Upton, Jaki F.
2011-09-01
Disasters often create large amounts of waste that must be managed as part of both immediate response and long-term recovery. While many federal, state, and local agencies have debris management plans, these plans often do not address chemical, biological, and radiological contamination. The Interagency Biological Restoration Demonstration’s (IBRD) purpose was to holistically assess all aspects of an anthrax incident and assist the development of a plan for long-term recovery. In the case of wide-area anthrax contamination and the follow-on response and recovery activities, a significant amount of material will require decontamination and disposal. Accordingly, IBRD facilitated the development of debrismore » management plans to address contaminated waste through a series of interviews and workshops with local, state, and federal representatives. The outcome of these discussion was the identification of three primary topical areas that must be addressed: 1) Planning; 2) Unresolved research questions, and resolving regulatory issues.« less
High-rise construction in the Russian economy: modeling of management decisions
NASA Astrophysics Data System (ADS)
Miroshnikova, Tatyana; Taskaeva, Natalia
2018-03-01
The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.
2016-05-01
purpose of the memo is to provide additional guidance to the DOD components for submission of data and justification material supporting their estimates...and Reset Guidance Report to Congressional Committees May 2016 GAO-16-414 United States Government Accountability Office United States...Incorporate Elements of a Strategic Management Planning Framework into Retrograde and Reset Guidance Why GAO Did This Study Following the end of major
ERIC Educational Resources Information Center
Missouri Univ., Columbia. Instructional Materials Lab.
This curriculum guide provides materials for a five-unit home health aide course. Each unit contains 4 to 36 lesson plans. Unit topics and representative lesson plan topics are as follows: (1) introduction (ethical and legal responsibilities, time management, reporting and recording); (2) communication (techniques, meeting the public, therapeutic…
Annotated Bibliography for Adult Educators in Institutional Settings.
ERIC Educational Resources Information Center
Elwyn Inst., PA.
This annotated bibliography of instructional materials for adult educators in institutional settings lists materials available in fourteen areas: basic skills, citizenship education, community services, consumer education, health and safety, mathematics, meal planning, money management, personal information/general life skills, pre-employment…
ERIC Educational Resources Information Center
Barnes, James L.
This curriculum guide is designed to assist junior high school industrial arts teachers in planning new courses and revising existing courses in manufacturing technology. Addressed in the individual units of the guide are the following topics: introduction to manufacturing, materials processing, personnel management, production management,…
Synthesis: Part I, Buildability.
ERIC Educational Resources Information Center
Pressman, Rob
This unit is designed to show the student how to pull together information on natural and man-managed systems to develop a coherent and environmentally sound plan of action. The material includes student guide sheets, reference material, and a tape script. Audiotapes are usually used with the materials. The unit assumes the student has studied a…
2014-04-08
assertions are free of material misstatement . There are two types of substantive testing: substantive analytical procedures and tests of details...identified internal control weaknesses continue to exist and are significant enough to result in material misstatements or a conclusion that account...records properly. As a result, CEHNC personnel processed $21.5 million in contractor payments, citing an incorrect obligation, and was at increased risk
Hunting and Wildlife Management. Issue Pac.
ERIC Educational Resources Information Center
Fish and Wildlife Service (Dept. of Interior), Washington, DC.
The materials in this educational packet are designed for use with students in grades 4 through 7. They consist of an overview, three lesson plans, student data sheets, and a poster. The overview discusses hunting as a tool for wildlife management, the management of wildlife populations and hunter participation in providing research data, and the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
DOT National Transportation Integrated Search
2009-08-01
Every day almost a million shipments of hazardous materials move safely and securely along our nations transportation system, via any combination of modes. Only a small fraction of total shipments interrupt their planned journey due to an incident...
Data Management & Decision Making. Technical Report No. 14.
ERIC Educational Resources Information Center
Speedie, Stuart M.; Sanders, Susan
"Data Management and Decision Making" is a set of instructional materials designed to teach practicing and potential educational administrators about the uses of operations research in educational administration. It consists of five units--"Operations Research in Education,""PERT/CPM: A Planning and Analysis…
Student Organizations--FBLA Projects and Activities Relating to Free Enterprise.
ERIC Educational Resources Information Center
Western Kentucky Univ., Bowling Green.
This guide for Future Business Leaders of America and Phi Beta Lambda chapters describes 25 economic awareness projects/activities to create awareness of the free enterprise economic system. Introductory materials include suggestions for project planning and management and a worksheet for planning activities and projects. The projects/activities…
40 CFR 60.2065 - What should I include in my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... include consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan must identify any..., the emissions reductions expected to be achieved, and any other environmental or energy impacts they...
Code of Federal Regulations, 2010 CFR
2010-01-01
... participant associated with planning, design, materials, installation, labor, management, maintenance, or..., construction, or maintenance of animal waste storage or treatment facilities or associated waste transport or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ouzounian, G.
2007-07-01
In 2005, new developments on radioactive-waste management in France were marked mostly by the preparation of the 2006 milestone specified in the act of 30 December 1991. A bill on radioactive waste management has been prepared by the Government at the beginning of 2006 and passed to the French Parliament on 15 June 2006. The Planning Act on the sustainable management of radioactive materials and wastes has been drawn from the results of the 15 years of research performed by ANDRA and the CEA on 'partitioning and transmutation of long-lived radionuclides', 'deep geological disposal' and 'conditioning and long term interimmore » storage'. Major milestones during those two last years are presented, including reviews of the Dossier 2005, official reports, the Public Debate, and finally the Planning Act. (authors)« less
Götze, R; Pivnenko, K; Boldrin, A; Scheutz, C; Astrup, T Fruergaard
2016-08-01
Physico-chemical waste composition data are paramount for the assessment and planning of waste management systems. However, the applicability of data is limited by the regional, temporal and technical scope of waste characterisation studies. As Danish and European legislation aims for higher recycling rates evaluation of source-segregation and recycling chains gain importance. This paper provides a consistent up-to-date dataset for 74 physico-chemical parameters in 49 material fractions from residual and 24 material fractions from source-segregated Danish household waste. Significant differences in the physico-chemical properties of residual and source-segregated waste fractions were found for many parameters related to organic matter, but also for elements of environmental concern. Considerable differences in potentially toxic metal concentrations between the individual recyclable fractions within one material type were observed. This indicates that careful planning and performance evaluation of recycling schemes are important to ensure a high quality of collected recyclables. Rare earth elements (REE) were quantified in all waste fractions analysed, with the highest concentrations of REE found in fractions with high content of mineral raw materials, soil materials and dust. The observed REE concentrations represent the background concentration level in non-hazardous waste materials that may serve as a reference point for future investigations related to hazardous waste management. The detailed dataset provided here can be used for assessments of waste management solutions in Denmark and for the evaluation of the quality of recyclable materials in waste. Copyright © 2016 Elsevier Ltd. All rights reserved.
Craney Island Disposal Area: Updated Projections for Filling Rates through 1989
1992-08-01
2,500-acre confined dredged material disposal facility located near Norfolk, VA. In 1981, the Cwaney Island Management Plan ( CIMP ) was developed to extend...the useful life of the site for disposal of maintenance material from the project area. The CIMP called for subdivision of the site into three...subcontainments and use of alternating filling and dewatering cycles. Management of the site in general accordance with the CIMP was implemented in 1984
10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... to the States as provided by section 274i of the Act and also to NRC staff and staff of the U.S. Navy... radioactive isotopes; (21) Oversees safe management and disposal of low-level radioactive wastes; (22) Plans...
10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... to the States as provided by section 274i of the Act and also to NRC staff and staff of the U.S. Navy... radioactive isotopes; (21) Oversees safe management and disposal of low-level radioactive wastes; (22) Plans...
10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... to the States as provided by section 274i of the Act and also to NRC staff and staff of the U.S. Navy... radioactive isotopes; (21) Oversees safe management and disposal of low-level radioactive wastes; (22) Plans...
10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... to the States as provided by section 274i of the Act and also to NRC staff and staff of the U.S. Navy... radioactive isotopes; (21) Oversees safe management and disposal of low-level radioactive wastes; (22) Plans...
10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... to the States as provided by section 274i of the Act and also to NRC staff and staff of the U.S. Navy... radioactive isotopes; (21) Oversees safe management and disposal of low-level radioactive wastes; (22) Plans...
Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective.
Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can
2016-01-01
Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers.
Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective
Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can
2016-01-01
Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers. PMID:26807848
Microgravity strategic planning exercise
NASA Technical Reports Server (NTRS)
Halpern, Richard; Downey, Jim; Harvey, Harold
1991-01-01
The Center for Space and Advanced Technology supported a planning exercise for the Microgravity Program management at the Marshall Space Flight Center. The effort focused on the status of microgravity work at MSFC and elsewhere with the objective of preparing a goal-oriented strategic planning document which could be used for informational/brochure purposes. The effort entailed numerous interactions and presentations with Field Center programmatic components and Headquarters personnel. Appropriate material was consolidated in a draft format for a MSFC Strategic Plan.
Operations management: a tool to increase profitability.
Mulvehill, M J
2001-03-01
Operations management enables the efficient utilization of the production systems in a business. This paper will address several key elements in the business competency of operations management. Specifically, this discussion will review the components of a material requirement planning system and a "just-in-time" system for inventory control and time management to enable the dentist to monitor a portion of the practice's overhead costs.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Covering All the Bases: A Model Hazardous Waste Program for Small Universities.
ERIC Educational Resources Information Center
MacPherson, Robert A.
1991-01-01
The Colorado School of Mines' experience illustrates that with good planning and enough money, a small university can provide a high level of waste management service, complying with government regulations. Considerations in developing the plan include a segregation scheme for incompatible materials, vehicle selection, and costs of ongoing…
The Teacher's Checklist. A "Flight Plan" for Effective Teaching and Classroom Management.
ERIC Educational Resources Information Center
Missouri State Dept. of Elementary and Secondary Education, Jefferson City.
Designed primarily for beginning teachers in Missouri public schools, this pamphlet provides a checklist of practical, common sense pointers for classroom teaching. Material is provided on seven topics, including planning before opening day, opening day, the first weeks, yearlong objectives, assistance from the principal and administrators, 10…
Market Analysis. What Is It? How Does It Fit into Comprehensive Institutional Planning?
ERIC Educational Resources Information Center
Groff, Warren
The basic principles of market analysis are examined in this paper especially as they relate to institutional planning. Introductory material presents background information, including: (1) a description of two projects undertaken to implement modern management techniques at small colleges; (2) an examination of three marketing philosophies; and…
ERIC Educational Resources Information Center
Enright, Margaret; Davidson, Tasha
These materials consist of: (1) a planning and implementation handbook designed to help Head Start managers better understand, plan, and implement a more comprehensive aproach to health education and health promotion--one that addresses local needs and tailors programs to the needs of the children, parents, and staff; and (2) a resource guide that…
NASA Astrophysics Data System (ADS)
Antonella Dino, Giovanna; Willy Danielsen, Svein; Chiappino, Claudia; Primavori, Piero; Engelsen, Christian John
2016-04-01
Resource preservation is one of the main challenges in Europe, together with waste management and recycling; recently several researchers are interested in the recovering of critical raw materials and secondary raw materials from landfill. Aggregate supply, even if it is not "critical" sensus stricto (s.s.), is one of the European priorities (low value but high volume needs). On the other side, the management of quarry waste , mainly from dimension stones, but also as fines from aggregate crushing, is still a matter of concern. Such materials are managed in different ways both locally and nationwide, and often they are landfilled, because of an unclear legislation and a general lack of data. Most of time the local authorities adopt the maximum precaution principle or the enterprises find it little profitable to recover them, so that the sustainable recycling of such material is not valued. Several studies have shown, depending on the material specific characteristics, the viability of recycling quarry waste into new raw materials used in glass and ceramic industries, precast concrete production, infrastructures etc. (Loudes et al. 2012, Dino&Marian 2015, Bozzola et al 2012, Dino et al. 2012, etc.). Thus, aggregate production may be one of the profitable ways to use quarry waste and is falling under the priority of EU (aggregate supply). Positive economic and environmental effects are likely to be achieved by systematic recycling of quarry waste planned by industries (industrial planning) and public authorities (national and local planning of aggregate exploitation). Today, the recycling level varies to a great extent and systematic recovery is not common among European Countries. In Italy and Norway no significant incentives on recycling or systematic approaches for local aggregate exploitation exist. The environmental consequences can be overexploitation of the natural resources, land take for the landfills, environmental contamination and landscape alteration by the quarry waste heaps. The environmentally sustainable management of quarry waste, which aims to recover and recycle both clean and contaminated materials, would therefore help to reduce the pressure on natural resources, reduce the land take and the environmental contamination. The present paper shows the main challenges connected to quarry waste management, focusing on several possibilities for quarry waste recovering, in order to produce recycled aggregates.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Activities; Submission to OMB for Review and Approval; Comment Request; Asbestos-Containing Materials in Schools and Asbestos Model Accreditation Plans AGENCY: Environmental Protection Agency (EPA). ACTION... Management and Budget (OMB) for review and approval: Asbestos-Containing Materials in Schools and Asbestos...
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
77 FR 71140 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut; NOX
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-29
... available docket materials available for inspection electronically in the Federal Docket Management System... Management, Department of Environmental Protection, State Office Building, 79 Elm Street, Hartford, CT 06106... EPA review and evaluate these trading orders? A. What is EPA's analysis of the fundamental principle...
40 CFR 63.10890 - What are my management practices and compliance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... pollution prevention management practices for metallic scrap and mercury switches in § 63.10885 and binder... of mercury switches and a site-specific plan implementing the material specifications according to... scrap providers who participate in a program for removal of mercury switches that has been approved by...
40 CFR 63.10890 - What are my management practices and compliance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... pollution prevention management practices for metallic scrap and mercury switches in § 63.10885 and binder... of mercury switches and a site-specific plan implementing the material specifications according to... scrap providers who participate in a program for removal of mercury switches that has been approved by...
40 CFR 63.10890 - What are my management practices and compliance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... pollution prevention management practices for metallic scrap and mercury switches in § 63.10885 and binder... of mercury switches and a site-specific plan implementing the material specifications according to... scrap providers who participate in a program for removal of mercury switches that has been approved by...
Marketing Research. Instructor's Manual.
ERIC Educational Resources Information Center
Small Business Administration, Washington, DC.
Prepared for the Administrative Management Course Program, this instructor's manual was developed to serve small-business management needs. The sections of the manual are as follows: (1) Lesson Plan--an outline of material covered, which may be used as a teaching guide, presented in two columns: the presentation, and a step-by-step indication of…
ERIC Educational Resources Information Center
Rodriguez, Walter; Opdenbosh, Augusto; Santamaria, Juan Carlos
2006-01-01
Visual information is vital in planning and managing construction operations, particularly, where there is complex terrain topography and salvage operations with limited accessibility and visibility. From visually-assessing site operations and preventing equipment collisions to simulating material handling activities to supervising remotes sites…
75 FR 58348 - Revision of the Shoshone National Forest Land and Resource Management Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... process: 1. Comprehensive Evaluation Report (CER) (April 2009)--Much of the background material in this report will be carried forward in the Analysis of the Management Situation or draft EIS. The CER..., and ecological conditions and trends that contribute to sustainability. The CER identifies factors...
Financial Success for Young Adults and Recent Graduates: Managing Money, Credit, and Your Future
ERIC Educational Resources Information Center
Arrowood, Janet C.
2006-01-01
There are numerous financial planning and money management handbooks, but few focus on the needs of young adults between 16 and 25 years of age. Colleges and some high schools are increasingly offering courses covering money management, but the materials are more "economics-focused" than "real-world" focused. Young people are huge consumers who…
The Leadership Evaluation and Analysis Program (LEAP). Economic Feasibility Report.
1979-07-01
data input and retrieval system that generates common solutions to Marine Corps con- cerns and produces leadership/ management training material while...experimental measures to assess the effects of Human Resource Management Cycle intervention aboard Navy ships (Mumford, 1976). Planned future evaluation...some management process or technique. Generally, the entire inter- vention procedure represents an expenditure toward the primary goal of improving
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green,T.
This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policymore » for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.« less
Process material management in the Space Station environment
NASA Technical Reports Server (NTRS)
Perry, J. L.; Humphries, W. R.
1988-01-01
The Space Station will provide a unique facility for conducting material-processing and life-science experiments under microgravity conditions. These conditions place special requirements on the U.S. Laboratory for storing and transporting chemicals and process fluids, reclaiming water from selected experiments, treating and storing experiment wastes, and providing vacuum utilities. To meet these needs and provide a safe laboratory environment, the Process Material Management System (PMMS) is being developed. Preliminary design requirements and concepts related to the PMMS are addressed, and the MSFC PMMS breadboard test facility and a preliminary plan for validating the overall system design are discussed.
Rissel, Chris; Wen, Li Ming
2017-01-01
Objectives After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners’ perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Materials and Methods Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Results Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Conclusions Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required. PMID:28135301
Energy Materials Coordinating Committee (EMaCC). Annual technical report, Fiscal Year 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2002-08-01
The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... met; (iii) Problems, delays, or adverse conditions which will materially affect attainment of planned... process which will improve local conditions and alleviate problems associated with increased coal or... Grantee programs, projects, related activities, and problems. (b) The Grantee shall inform the Grantor as...
1977-01-01
services . He is the integrated material manager for bulk petroleum products and performs contract administration overseas. The Chief of Naval Operations...technologies with other requirements ( health . safety, environmental protection, and economic regulation). Federal Energy Administration FEA was established in...Naval Oil Shale Reserve No. 3 (Colorado No. 2) ........... .. 5-4 5.3 Administration or the Reserves ........................... 5-4 5.4 Future Plans
Microbiological performance of a food safety management system in a food service operation.
Lahou, E; Jacxsens, L; Daelman, J; Van Landeghem, F; Uyttendaele, M
2012-04-01
The microbiological performance of a food safety management system in a food service operation was measured using a microbiological assessment scheme as a vertical sampling plan throughout the production process, from raw materials to final product. The assessment scheme can give insight into the microbiological contamination and the variability of a production process and pinpoint bottlenecks in the food safety management system. Three production processes were evaluated: a high-risk sandwich production process (involving raw meat preparation), a medium-risk hot meal production process (starting from undercooked raw materials), and a low-risk hot meal production process (reheating in a bag). Microbial quality parameters, hygiene indicators, and relevant pathogens (Listeria monocytogenes, Salmonella, Bacillus cereus, and Escherichia coli O157) were in accordance with legal criteria and/or microbiological guidelines, suggesting that the food safety management system was effective. High levels of total aerobic bacteria (>3.9 log CFU/50 cm(2)) were noted occasionally on gloves of food handlers and on food contact surfaces, especially in high contamination areas (e.g., during handling of raw material, preparation room). Core control activities such as hand hygiene of personnel and cleaning and disinfection (especially in highly contaminated areas) were considered points of attention. The present sampling plan was used to produce an overall microbiological profile (snapshot) to validate the food safety management system in place.
Lincoln Urban Pollutant Reduction Strategies
This project reviewed existing materials related to Antelope Creek, primarily the Antelope Creek Watershed Basin Management Plan and any resources such as ordinances to categorize and evaluate any potential sources of pollutants.
Department of Defense Office of the Inspector General FY 2013 Audit Plan
2012-11-01
oversight procedures to review KPMG LLPs work; and if applicable disclose instances where KPMG LLP does not comply, in all material respects, with U.S...decisions. Pervasive material internal control weaknesses impact the accuracy, reliability and timeliness of budgetary and accounting data and...reported the same 13 material internal control weaknesses as in the previous year. These pervasive and longstanding financial management challenges
Multimedia Projects in Education: Designing, Producing, and Assessing, Third Edition
ERIC Educational Resources Information Center
Ivers, Karen S.; Barron, Ann E.
2005-01-01
Building on the materials in the two previous successful editions, this book features approximately 40% all new material and updates the previous information. The authors use the DDD-E model (Decide, Design, Develop--Evaluate) to show how to select and plan multimedia projects, use presentation and development tools, manage graphics, audio, and…
Data management plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.
Feasibility study for early removal of HEU from CPP-651-Phase II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, C.V.; Henry, R.; Milligan, C.
1997-09-01
A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology andmore » the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.« less
Program Impact Evaluations: An Introduction for Managers of Title VII Projects. A Draft Guidebook.
ERIC Educational Resources Information Center
Bissell, Joan S.
Intended to assist administrators in the planning, management, and utilization of evaluation, this guidebook is designed as an introduction and supplement to other evaluation materials for bilingual education programs being developed under federal sponsorship, including evaluation models for Title VII projects. General information is provided on…
Helping People with Autism Manage Their Behavior. Fourth Edition.
ERIC Educational Resources Information Center
Dalrymple, Nancy Justin
This source book focuses on helping people with autism manage their behavior by analyzing the learning environment and the purpose of the behavior and then teaching new skills and behaviors. Introductory material covers the approach's philosophy and the importance of a longitudinal program plan. A section on creating a physical environment for…
NIST: Information Management in the AMRF
NASA Technical Reports Server (NTRS)
Callaghan, George (Editor)
1991-01-01
The information management strategies developed for the NIST Automated Manufacturing Research Facility (AMRF) - a prototype small batch manufacturing facility used for integration and measurement related standards research are outlined in this video. The five major manufacturing functions - design, process planning, off-line programming, shop floor control, and materials processing are explained and their applications demonstrated.
Akiyama, M
2007-01-01
The concept of our system is not only to manage material flows, but also to provide an integrated management resource, a means of correcting errors in medical treatment, and applications to EBM (evidence-based medicine) through the data mining of medical records. Prior to the development of this system, electronic processing systems in hospitals did a poor job of accurately grasping medical practice and medical material flows. With POAS (Point of Act System), hospital managers can solve the so-called, "man, money, material, and information" issues inherent in the costs of healthcare. The POAS system synchronizes with each department system, from finance and accounting, to pharmacy, to imaging, and allows information exchange. We can manage Man (Business Process), Material (Medical Materials and Medicine), Money (Expenditure for purchase and Receipt), and Information (Medical Records) completely by this system. Our analysis has shown that this system has a remarkable investment effect - saving over four million dollars per year - through cost savings in logistics and business process efficiencies. In addition, the quality of care has been improved dramatically while error rates have been reduced - nearly to zero in some cases.
Innovative IT system for material management in warehouses
NASA Astrophysics Data System (ADS)
Papoutsidakis, Michael; Sigala, Maria; Simeonaki, Eleni; Tseles, Dimitrios
2017-09-01
Nowadays through the rapid development of technology in all areas there is a constant effort to introduce technological solutions in everyday life with emphasis on materials management information systems (Enterprise Resource Planning). During the last few years the variety of these systems has been increased for small business or for SMEs as well as for larger companies and industries. In the field of material management and main management operations with automated processes, ERP applications have only recently begun to make their appearance. In this paper will be presented the development of a system for automated material storage process in a system built through specific roles that will manage materials using an integrated barcode scanner. In addition we will analyse and describe the operation and modules of other systems that have been created for the same usage. The aim of this project is to create a prototype application that will be innovative with a flexible nature that will give solutions, with low cost and it will be user friendly. This application will allow quick and proper materials management for storage. The expected result is that the application can be used by smart devices in android environment and computers without an external barcode scanner, making the application accessible to the buyer at low cost.
Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.
1994-08-01
This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65.more » The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Jacobs, Raymer J.E.
2008-06-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).« less
Simic, Vladimir; Dimitrijevic, Branka
2015-02-01
An interval linear programming approach is used to formulate and comprehensively test a model for optimal long-term planning of vehicle recycling in the Republic of Serbia. The proposed model is applied to a numerical case study: a 4-year planning horizon (2013-2016) is considered, three legislative cases and three scrap metal price trends are analysed, availability of final destinations for sorted waste flows is explored. Potential and applicability of the developed model are fully illustrated. Detailed insights on profitability and eco-efficiency of the projected contemporary equipped vehicle recycling factory are presented. The influences of the ordinance on the management of end-of-life vehicles in the Republic of Serbia on the vehicle hulks procuring, sorting generated material fractions, sorted waste allocation and sorted metals allocation decisions are thoroughly examined. The validity of the waste management strategy for the period 2010-2019 is tested. The formulated model can create optimal plans for procuring vehicle hulks, sorting generated material fractions, allocating sorted waste flows and allocating sorted metals. Obtained results are valuable for supporting the construction and/or modernisation process of a vehicle recycling system in the Republic of Serbia. © The Author(s) 2015.
The Self-Identified Skills and Competencies of First-Line Nurse Managers
1992-06-01
teaching, with the exception of evaluation of patient education classes and materials. 17 Human Resources Development. 1) selection. with the exception of...specifically being able to evaluate patient education classes and materials; and 2) evaluating results, by being able to monitor the quality of care...for patient education materials and classes to be used on the unit. 2. Evaluate patient and family teaching including discharge planning. 3. Evaluate
ERIC Educational Resources Information Center
Varley, Rachel; Webb, Thomas L.; Sheeran, Paschal
2011-01-01
Objective: The effectiveness of self-help materials may be constrained by failures to undertake recommended exercises or to deploy the techniques that one has learned at the critical moment. The present randomized controlled trial investigated whether augmenting self-help materials with if-then plans (or implementation intentions) could overcome…
DOE Office of Scientific and Technical Information (OSTI.GOV)
ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION
This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP thatmore » details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROOT, R.W.
1999-05-18
This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.
Multiyear Program Plan for the High Temperature Materials Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arvid E. Pasto
2000-03-17
Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly,more » the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
... electronically at www.regulations.gov and in hard copy at EPA Region IX, 75 Hawthorne Street, San Francisco... publicly available only at the hard copy location (e.g., copyrighted material, large maps), and some may not be publicly available in either location (e.g., CBI). To inspect the hard copy materials, please...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
... Environmental Impact Statement for a 20-Year Dredged Material Management Plan for the Atlantic Intracoastal... Engineers is the lead Federal agency for an evaluation of the maintenance dredging of the Atlantic... analyze the impacts of the maintenance dredging of this portion of the AIWW, including disposal of dredged...
Defence Capability Plan 2009 (Australian Department of Defence). Public Version
2009-01-24
workings or Intellectual Property . > Armoured vehicles. This capability relates to the repair, maintenance and some upgrades of specialist military...cryptographic equipment. > Composite and exotic materials. This is the ability to repair specialist alloys and composite materials, to develop new...manufacture of some high usage munitions, ammunition components, propellants and explosives. > Signature management. Includes the capabilities and coatings
Health Promotion Interventions for Low-Income Californians Through Medi-Cal Managed Care Plans, 2012
Kohatsu, Neal D.; Paciotti, Brian M.; Byrne, Jennifer V.; Kizer, Kenneth W.
2015-01-01
Introduction Prevention is the most cost-effective approach to promote population health, yet little is known about the delivery of health promotion interventions in the nation’s largest Medicaid program, Medi-Cal. The purpose of this study was to inventory health promotion interventions delivered through Medi-Cal Managed Care Plans; identify attributes of the interventions that plans judged to have the greatest impact on their members; and determine the extent to which the plans refer members to community assistance programs and sponsor health-promoting community activities. Methods The lead health educator from each managed care plan was asked to complete a 190-item online survey in January 2013; 20 of 21 managed care plans responded. Survey data on the health promotion interventions with the greatest impact were grouped according to intervention attributes and measures of effectiveness; quantitative data were analyzed using descriptive statistics. Results Health promotion interventions judged to have the greatest impact on Medi-Cal members were delivered in various ways; educational materials, one-on-one education, and group classes were delivered most frequently. Behavior change, knowledge gain, and improved disease management were cited most often as measures of effectiveness. Across all interventions, median educational hours were limited (2.4 h), and median Medi-Cal member participation was low (265 members per intervention). Most interventions with greatest impact (120 of 137 [88%]) focused on tertiary prevention. There were mixed results in referring members to community assistance programs and investing in community activities. Conclusion Managed care plans have many opportunities to more effectively deliver health promotion interventions. Establishing measurable, evidence-based, consensus standards for such programs could facilitate improved delivery of these services. PMID:26564012
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-10
.... Alternative B: Same as Alternative A. Alternative C: ACEC would be rescinded. Closed to wind and solar energy... mineral material sales. Closed to wind and solar energy. Closed to motorized travel. Visual Resource... and Hilltop. Closed to wind and solar energy. Visual Resource Management Class I would apply to a...
USBI Booster Production Company's Hazardous Waste Management Program at the Kennedy Space Center, FL
NASA Technical Reports Server (NTRS)
Venuto, Charles
1987-01-01
In response to the hazardous-waste generating processes associated with the launch of the Space Shuttle, a hazardous waste management plan has been developed. It includes waste recycling, product substitution, waste treatment, and waste minimization at the source. Waste material resulting from the preparation of the nonmotor segments of the solid rocket boosters include waste paints (primer, topcoats), waste solvents (methylene chloride, freon, acetone, toluene), waste inorganic compounds (aluminum anodizing compound, fixer), and others. Ways in which these materials are contended with at the Kennedy Space Center are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abston, J.P.
1997-04-01
The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Gunite and Associated Tanks (GAAT) in the North and South Tank Farms (NTF and STF) at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to health and safety (H and S) issues. The policy and procedures in this plan apply to all GAAT operations in the NTF and STF. The provisions of this plan are to bemore » carried out whenever activities identifies s part of the GAAT are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices in order to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air. This plan explains additional task-specific health and safety requirements such as the Site Safety and health Addendum and Activity Hazard Analysis, which should be used in concert with this plan and existing established procedures.« less
Risk management technique for liquefied natural gas facilities
NASA Technical Reports Server (NTRS)
Fedor, O. H.; Parsons, W. N.
1975-01-01
Checklists have been compiled for planning, design, construction, startup and debugging, and operation of liquefied natural gas facilities. Lists include references to pertinent safety regulations. Methods described are applicable to handling of other hazardous materials.
Mission management, planning, and cost: PULSE Attitude And Control Systems (AACS)
NASA Technical Reports Server (NTRS)
1990-01-01
The Pluto unmanned long-range scientific explorer (PULSE) is a probe that will do a flyby of Pluto. It is a low weight, relatively low costing vehicle which utilizes mostly off-the-shelf hardware, but not materials or techniques that will be available after 1999. A design, fabrication, and cost analysis is presented. PULSE will be launched within the first decade of the twenty-first century. The topics include: (1) scientific instrumentation; (2) mission management, planning, and costing; (3) power and propulsion systems; (4) structural subsystem; (5) command, control, and communication; and (6) attitude and articulation control.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
Innovative Life Cycle Management Systems for Composites. Phase 1
1991-12-01
of the window were not yet identified with a particular batch, but we knew that they would be required to be Kevlar -29 and Polyester. From this plan...materials and processes and has selected Kevlar batch #139 as one of the starting materials. (KevIar was chosen as the only material in this example to...assigned to the flow diagram by clicking on a material icon. The accompanying control panel allowed the user I, I to inspect the batches of Kevlar in
Proceedings of the LDEF Materials Data Analysis Workshop
NASA Technical Reports Server (NTRS)
Stein, Bland A. (Compiler); Young, Philip R. (Compiler)
1990-01-01
The 5-year, 10-month flight of the Long Duration Exposure Facility (LDEF) greatly enhanced the potential value of most LDEF materials, compared to the original 1-year flight plan. NASA recognized this potential by forming the LDEF Space Environmental Effects on Materials Special Investigation Group in early 1989 to address the expanded opportunities available in the LDEF structure and on experimental trays, so that the value of all LDEF materials to current and future space missions would be assessed and documented. The LDEF Materials Data Analysis Workshop served as one step toward the realization of that responsibility and ran concurrently with activities surrounding the successful return of the spacecraft to the NASA Kennedy Space Center. A compilation of visual aids utilized by speakers at the workshop is presented. Session 1 summarized current information on analysis responsibilities and plans and was aimed at updating the workshop attendees: the LDEF Advisory Committee, Principle Investigators, Special Investigation Group Members, and others involved in LDEF analyses or management. Sessions 2 and 3 addressed materials data analysis methodology, specimen preparation, shipment and archival, and initial plans for the LDEF Materials Data Base. A complementary objective of the workshop was to stimulate interest and awareness of opportunities to vastly expand the overall data base by considering the entire spacecraft as a materials experiment.
Analysis of a Proposed Material Handling System Using a Computer Simulation Model.
1981-06-01
the proposed MMHS were identified to assist the managers of the system in implementation and future planning. * 4 UNCLASSIFIED SRCUllTY CLASSIPICATION...the Degree of Master of Science in Logistics Management By Darwin D. Harp, BSIE GS-11. June 1981 Approved for public release; distribution unlimited...partial fulfillment of the requirements for the degree of MASTER OF SCIENCE IN LOGISTICS MANAGEMENT DATE: 17 June 1981 (( COMMITECARN ii 67- B I
Lagrange multiplier for perishable inventory model considering warehouse capacity planning
NASA Astrophysics Data System (ADS)
Amran, Tiena Gustina; Fatima, Zenny
2017-06-01
This paper presented Lagrange Muktiplier approach for solving perishable raw material inventory planning considering warehouse capacity. A food company faced an issue of managing perishable raw materials and marinades which have limited shelf life. Another constraint to be considered was the capacity of the warehouse. Therefore, an inventory model considering shelf life and raw material warehouse capacity are needed in order to minimize the company's inventory cost. The inventory model implemented in this study was the adapted economic order quantity (EOQ) model which is optimized using Lagrange multiplier. The model and solution approach were applied to solve a case industry in a food manufacturer. The result showed that the total inventory cost decreased 2.42% after applying the proposed approach.
ANL site response for the DOE FY1994 information resources management long-range plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boxberger, L.M.
1992-03-01
Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less
ANL site response for the DOE FY1994 information resources management long-range plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boxberger, L.M.
1992-03-01
Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less
Federal Reading Rooms for Risk Management Plans (RMP)
Reading Rooms, listed here by state, are open to the public by either appointment or walk-in. You may access Off-Site Consequence Analysis (scenarios) portions of RMPs, and take notes but not remove or reproduce materials.
Hanford Site Asbestos Abatement Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mewes, B.S.
The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less
ERIC Educational Resources Information Center
Brandvik, Mary Lou; McKnight, Katherine S.
2011-01-01
This unique time-saving book is packed with tested techniques and materials to assist new and experienced English teachers with virtually every phase of their job from lesson planning to effective discipline techniques. The book includes 175 easy-to-understand strategies, lessons, checklists, and forms for effective classroom management and over…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-13
... intended to maintain the shoreline over the next 15 to 20 years. The project area consists of four reaches.... Alternatives B-1 and B-5 discuss beach nourishment using material from an upland source in 1- and 5-year frequencies. Beach nourishment using dredged materials in 1- and 5-year frequencies is described in...
ERIC Educational Resources Information Center
Ziener, George H.; And Others
The planning, production, validation, and revision of learning materials designed for use in institutes for science supervisors is described in this first of five volumes. Four sets of packages, ("Role of the Science Supervisor,""Introduction to Educational Technology,""An Application of Educational Technology," and "Management Kits,") each using…
SB 1082 -- Unified hazardous materials/waste program: Local implementation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, W.
California Senate Bill 1082 was signed into law in the fall of 1993 because business and industry believed there were too many hazardous materials inspectors asking the same questions, looking at the same items and requiring similar information on several variations of the same form. Industry was not happy with the large diversity of programs, each with its own inspectors, permits and fees, essentially doing what industry believed was the same inspection. SB 1082 will allow local city and county agencies to apply to the California Environmental Protection Agency to become a Certified Unified Program Agency (CUPA) or work withmore » a CUPA as a Participating Agency (PA) to manage specific program elements. The CUPA will unify six regulatory programs including hazardous waste/tiered permitting, aboveground storage tanks, underground storage tanks, business and area plans/inventory or disclosure, acutely hazardous materials/risk management prevention and Uniform Fire Code programs related to hazardous materials inventory/plan requirements. The bill requires the CUPA to (1) implement a permit consolidation program; (2) implement a single fee system with a state surcharge; (3) consolidate, coordinate and make consistent any local or regional requirements or guidance documents; and (4) implement a single unified inspection and enforcement program.« less
Promoting Leisure. Leisure Management Module. Operational Management Programme.
ERIC Educational Resources Information Center
Wright, Anthony; And Others
This module on promoting leisure is intended to give an understanding of the methods that can be used to market leisure products and services and how to plan the marketing of leisure. The material is presented in a self-instructional format in seven sections. At the beginning of each section is a statement of the objectives that will be achieved…
The NISTmAb Reference Material 8671 lifecycle management and quality plan.
Schiel, John E; Turner, Abigail
2018-03-01
Comprehensive analysis of monoclonal antibody therapeutics involves an ever expanding cadre of technologies. Lifecycle-appropriate application of current and emerging techniques requires rigorous testing followed by discussion between industry and regulators in a pre-competitive space, an effort that may be facilitated by a widely available test metric. Biopharmaceutical quality materials, however, are often difficult to access and/or are protected by intellectual property rights. The NISTmAb, humanized IgG1κ Reference Material 8671 (RM 8671), has been established with the intent of filling that void. The NISTmAb embodies the quality and characteristics of a typical biopharmaceutical product, is widely available to the biopharmaceutical community, and is an open innovation tool for development and dissemination of results. The NISTmAb lifecyle management plan described herein provides a hierarchical strategy for maintenance of quality over time through rigorous method qualification detailed in additional submissions in the current publication series. The NISTmAb RM 8671 is a representative monoclonal antibody material and provides a means to continually evaluate current best practices, promote innovative approaches, and inform regulatory paradigms as technology advances. Graphical abstract The NISTmAb Reference Material (RM) 8671 is intended to be an industry standard monoclonal antibody for pre-competitive harmonization of best practices and designing next generation characterization technologies for identity, quality, and stability testing.
Strategies to introduce Data Management techniques into the German university curriculum
NASA Astrophysics Data System (ADS)
Söding, E.; Fleischer, D.
2017-12-01
Data Management is high on the agenda of the German Research Organizations and Universities. While many organizations have committed to high level data management plans, these plans are often loosely binding and not followed adequately. As a consequence, few practical concepts are in place, implementing a sustainable reliable processing, archiving and publication of research data. While many institutions struggle with the organizational level, at which data management is implemented, Students are educated and time is lost, teaching them relevance, techniques and strategies in dealing in a thoughtful and ahead looking manner with their research data. Within a new research project we are tackling this problem in a two-fold way. 1. we are involving technical university personnel, who are working in labs, producing scientific data, in data management processes. This requires teaching, analysis of lab practices and the development of applications for support. 2. We are developing new teaching material, in order to introduce such DM strategies into regular practical courses conducted in such labs, by starting small scale experiments on long term time series. These can be analyzed by student within practical courses, and will demonstrate the practical use of DM practices in the courses. While the focus is on natural science labs, we also strive to create material for other disciplines using e.g. text analysis techniques, in particular in linguistics and history. By doing so, we are touching not only the traditional data-heavy disciplines, but try to bridge responsibility for this task over several disciplines and faculties, in order to raise broad acceptance and recognition in the whole university for the benefits of structured Data Management plans in projects.
Critical systems for public health management of floods, North Dakota.
Wiedrich, Tim W; Sickler, Juli L; Vossler, Brenda L; Pickard, Stephen P
2013-01-01
Availability of emergency preparedness funding between 2002 and 2009 allowed the North Dakota Department of Health to build public health response capabilities. Five of the 15 public health preparedness capability areas identified by the Centers for Disease Control and Prevention in 2011 have been thoroughly tested by responses to flooding in North Dakota in 2009, 2010, and 2011; those capability areas are information sharing, emergency operations coordination, medical surge, material management and distribution, and volunteer management. Increasing response effectiveness has depended on planning, implementation of new information technology, changes to command and control procedures, containerized response materials, and rapid contract procedures. Continued improvement in response and maintenance of response capabilities is dependent on ongoing funding.
Department of Defense Energy Management Plan, 1980
1980-07-01
for Testing and Materials , and the Society of Automotive Engineers. Following successful corn- pletion of these tests , we will report the effect of...Shelf crude oil which we will exchange for military petroleum products. We plan to expand our access to government -owned crude oil thereafter as we gain...experience and as more crude oil becomes available. In early 1981 we will conduct a politico-military simulaton to test Defense contractual
Performance-Based Service Acquisition (PBSA) Study and Graduate Level Course Material
2005-12-01
Realizing Marketplace Potential, Acquisition Solutions, Inc (Advisory), February 2001 Dickson, Bob, March 10, 2003. Federal 7 Contract Law : Feds...Management and Policy Federal Contract Law : Feds should use market research to refine IT plans Session 4: The Performance Requirements and...March 10, 2003. Federal Contract Law : Feds should use market research to refine IT plans, Post-Newsweek Media, Inchttp://appserv.gcn.com/cgi- bin/udt
Stochastic Optimization in The Power Management of Bottled Water Production Planning
NASA Astrophysics Data System (ADS)
Antoro, Budi; Nababan, Esther; Mawengkang, Herman
2018-01-01
This paper review a model developed to minimize production costs on bottled water production planning through stochastic optimization. As we know, that planning a management means to achieve the goal that have been applied, since each management level in the organization need a planning activities. The built models is a two-stage stochastic models that aims to minimize the cost on production of bottled water by observing that during the production process, neither interfernce nor vice versa occurs. The models were develop to minimaze production cost, assuming the availability of packing raw materials used considered to meet for each kind of bottles. The minimum cost for each kind production of bottled water are expressed in the expectation of each production with a scenario probability. The probability of uncertainly is a representation of the number of productions and the timing of power supply interruption. This is to ensure that the number of interruption that occur does not exceed the limit of the contract agreement that has been made by the company with power suppliers.
International Distance Education.
ERIC Educational Resources Information Center
Perrin, Don; Perrin, Elizabeth
1995-01-01
Reports on the Commonwealth of Learning (COL) and its role in furthering the use of distance learning technology. Highlights include activities; telecommunications; educational media; training; planning and advice; strategic alliances and outlooks; public administration; student record/management system; institutional and material development; a…
Public guidance for managing hazardous material transportation in Texas.
DOT National Transportation Integrated Search
2009-08-01
Only a small fraction of the millions of daily hazmat shipments interrupt their planned journey due to : an incident that may severely threaten public and environmental safety. However, this threat of very rare but : very severe consequences elevates...
2011-02-01
search capability for Air Force Research Information Management System (AFRIMS) data as a part of federated search under DTIC Online Access...provide vetted requests to dataset owners. • Develop a federated search capability for databases containing limited distribution material. • Deploy
Analysis of decision support system for dredging operations management.
DOT National Transportation Integrated Search
2005-12-01
This research developed an improved method for optimizing the disposal of dredged material : at offshore disposal sites. A nonlinear programming model has been developed to assist in : the development of dredging plans at open water disposal sites. T...
Integrating the Clearance in NPP Residual Material Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia-Bermejo, R.; Lamela, B.
Previous Experiences in decommissioning projects are being used to optimize the residual material management in NPP, metallic scrap usually. The approach is based in the availability of a materials Clearance MARSSIM-based methodology developed and licensed in Spain. A typical project includes the integration of segregation, decontamination, clearance, quality control and quality assurance activities. The design is based in the clearance methodology features translating them into standard operational procedures. In terms of ecological taxes and final disposal costs, significant amounts of money could be saved with this type of approaches. The last clearance project managed a total amount of 405 tonsmore » scrap metal and a similar amount of other residual materials occupying a volume of 1500 m{sup 3}. After less than a year of field works 251 tons were finally recycled in a non-licensed smelting facility. The balance was disposed as LILW. In the planning phase the estimated cost savings were 4.5 Meuro. However, today a VLLW option is available in European countries so, the estimated cost savings are reduced to 1.2 Meuro. In conclusion: the application of materials clearance in NPP decommissioning lessons learnt to the NPP residual material management is an interesting management option. This practice is currently going on in Spanish NPP and, in a preliminary view, is consistent with the new MARSAME Draft. An interesting parameter is the cost of 1 m3 of recyclable scrap. The above estimates are very project specific because in the segregation process other residual materials were involved. If the effect of this other materials is removed the estimated Unit Cost were in this project around 1700 euro/m{sup 3}, this figure is clearly below the above VLLW disposal cost of 2600 euro. In a future project it appears feasible to descend to 839 euro/m{sup 3} and if it became routine values and is used in big Decommissioning projects, around 600 euro/m{sup 3} or below possibly could be achieved. A rough economical analysis permits to estimate a saving around 2000 US$ to 13000 US$ per cubic meter of steel scrap according the variability of materials and disposal costs. Many learnt lessons of this practice were used as a feed back in the planning of characterization activities for decommissioning a Spanish NPP and today are considered as a significant reference in our Decommissioning engineering approaches.« less
Evaluation of sludge management alternatives in Istanbul metropolitan area.
Cakmakci, M; Erdim, E; Kinaci, C; Akca, L
2005-01-01
The main concern of this paper was to predict the sludge quantities generated from 18 wastewater treatment plants, which were stated to be established in the "Istanbul Water Supply, Sewerage and Drainage, Sewage Treatment and Disposal Master Plan", 10 of which are in operation at present. Besides this, obtaining the required data to compare various treatment schemes was another goal of the study. Especially, the estimation of the sludge quantity in the case of enhanced primary sedimentation was of importance. Wastewater sludge management strategies were discussed in order to develop suggestions for Istanbul Metropolitan city. Within this context, the wastewater treatment facilities, mentioned in the Master Plan that had been completed by 2000, were evaluated in terms of sludge production rates, locations and technical and management aspects. Disposal alternatives of the wastewater treatment sludge were also evaluated in this study. Using of the dewatered sludge as a landfill cover material seems the best alternative usage. Up to the year of 2040, the requirement of cover material for landfills in Istanbul will be met by the dewatered sludge originated from wastewater treatment plants in the region.
Conference on asbestos control and replacement for electric utilities: Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
An EPRI conference on Asbestos Control and Replacement for Electric Utilities was held April 9, 1992 in conjunction with the National Asbestos Council's Environmental Management 192 Conference and Exposition. The high cost and potential liabilities of asbestos removal projects, compounded by concerns over the health effects of asbestos replacement materials, was the main motivation for the conference. The objective of the conference was to assemble guidance and information that will help utilities manage asbestos and to effectively prioritize EPRI research in this area. Ten papers covered such topics as computer-aided asbestos management, utility experience with asbestos management, asbestos monitoring andmore » disposal, and asbestos replacement materials. Utility feedback received at the conference indicates that present and planned EPRI research activities in this area will effectively meet industry needs.« less
Planning for Sustainable Water Supplies for US Army Installations
2011-10-01
2011 Energy/ Water Nexus Thermoelectric power Geothermal Biofuels CSP i.e. Solar HW Hydropower Carbon Capture Fracking Planning for Sustainable Water ...2011 GreenGov Symposium Oct. 31 ‐ Nov. 2, 2011 Washington Hilton Washington, DC Water & Materials Management – Session 2 Assessing Water Related...Risks in Operations October 31, 2011 Planning for Sustainable Water Supplies for US Army Installations Elisabeth Jenicek Mechanical Engineer/Regional
James C. Finley; Susan L. Stout; Timothy G. Pierson; Barbara J. McGuinness
2007-01-01
At least 80 percent of the raw material used for wood products by the forest industry is from privately owned woodlands. This publication provides material for a course designed to help landowners, foresters, and loggers work together to assess whether a planned timber harvest will retain the diversity of species on site. It includes methods for collecting overstory...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, K.; Tsai, H.; Decision and Information Sciences
The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it canmore » be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.« less
Materials Processing in Space (MPS) program description
NASA Technical Reports Server (NTRS)
1981-01-01
Insight is provided into the scientific rotationale for materials processing in space (MPS), and a comprehensive and cohesive approach for implementation and integration of the many, diverse aspects of MPS is described. The programmatic and management functions apply to all projects and activities implemented under MPS. It is intended that specific project plans, providing project unique details, will be appended to this document for endeavors such as the Space Processing Applications Rocket (SPAR) Project, the Materials Experiment Assembly (MEA) Project, the MPS/Spacelab (MPS/SL) Project, and the Materials Experiment Carrier (MEC) Payloads.
ERIC Educational Resources Information Center
Butterfield, Sherri M.
The three units in this guide are designed to teach language, mathematics, and social studies skills associated with earning and managing money to students in grades 7-9. Each unit includes notes to aid the teacher in preparing and presenting the material, pre/post tests, and a series of one-page reproducible sheets which contain information or…
ERIC Educational Resources Information Center
Jackson, Marilyn N. Malloy
2006-01-01
Are teachers aware of the stress in their classrooms? Do teachers plan for stress control? Educators need to understand why stress is a part of classroom life and how it affects the teacher-student relationship. Bibliotherapy can be an intervention in stress management through books. The use of appropriate reading material to help solve emotional…
The Mechanization of Design and Manufacturing.
ERIC Educational Resources Information Center
Gunn, Thomas G.
1982-01-01
Describes changes in the design of products and in planning, managing, and coordinating their manufacture. Focuses on discrete-products manufacturing industries, encompassing the fabrication and assembly of automobiles, aircraft, computers and microelectric components of computers, furniture, appliances, foods, clothing, building materials, and…
The "Total Immersion" Meeting Environment.
ERIC Educational Resources Information Center
Finkel, Coleman
1980-01-01
The designing of intelligently planned meeting facilities can aid management communication and learning. The author examines the psychology of meeting attendance; architectural considerations (lighting, windows, color, etc.); design elements and learning modes (furniture, walls, audiovisuals, materials); and the idea of "total immersion meeting…
AN OVERVIEW OF TOXICANT IDENTIFICATION IN SEDIMENTS AND DREDGED MATERIALS
The identification of toxicants affecting aquatic benthic systems is critical to sound assessment and management of our nation?s waterways. Identification of toxicants can be useful in designing effective sediment remediation plans and reasonable options for sediment disposal. K...
P2 Guide for Making a Visible Difference in Communities During Extreme Weather Events
Developing procedures for minimizing hazardous materials releases during extreme weather events can reduce or even eliminate risks to human life and property and should be an integral part of a community’s emergency management planning.
The September 2013 EPA Region 5 report and factsheet provide tools to help with waste management plans, waste disposal, handling hazardous materials, and earthwork. The documents also suggest demolition modifications to improve environmental results.
Rep. DeLauro, Rosa L. [D-CT-3
2014-05-06
House - 05/07/2014 Referred to the Subcommittee on Railroads, Pipelines, and Hazardous Materials. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Schmeck, J; Schmeck, S B; Kohnen, W; Werner, C; Schäfer, M; Gervais, H
2008-08-01
The implementation of diagnosis-related groups (DRGs) sharply increased economic pressure on hospitals. Hence, process optimization was focussed on cost-intensive areas, namely the operation room (OR) departments. Work-flow in the OR is characterized by a mandatory interlocking of the job functions of many different occupational groups and the availability of a variety of different materials. Alternatives for staff assignment optimization have been published in numerous publications dealing with the importance of OR management. In this connection the issue of material logistics in the context of OR management has not been frequently addressed. In order to perform a surgical procedure according to plan, one depends on personnel and on timely availability of the materials needed. Supply of sterilized materials is of utmost importance, because in most hospitals sterilized surgical devices constitute a critical resource. In order to coordinate the OR process with the production flow of sterilized materials, an organizational connection to the OR management makes sense. Hence, in a German university hospital the Department of Hospital Sterile Supplies was integrated into the OR management of the Department of Anesthesiology. This led to a close coordination of work-flow processes, and concomitantly a significant reduction of production costs of sterile supplies could be achieved by direct interaction with the OR. Thus, hospital sterile supplies can reasonably be integrated into an OR management representing a new interesting business area for OR organization.
A cost-benefit analysis for materials management information systems.
Slapak-Iacobelli, L; Wilde, A H
1993-02-01
The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.
Towards Knowledge Management for Smart Manufacturing.
Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard
2017-09-01
The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.
GIS-based planning system for managing the flow of construction and demolition waste in Brazil.
Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo
2018-05-01
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
Advanced Materials for Exploration Task Research Results
NASA Technical Reports Server (NTRS)
Cook, M. B. (Compiler); Murphy, K. L.; Schneider, T.
2008-01-01
The Advanced Materials for Exploration (AME) Activity in Marshall Space Flight Center s (MSFC s) Exploration Science and Technology Directorate coordinated activities from 2001 to 2006 to support in-space propulsion technologies for future missions. Working together, materials scientists and mission planners identified materials shortfalls that are limiting the performance of long-term missions. The goal of the AME project was to deliver improved materials in targeted areas to meet technology development milestones of NASA s exploration-dedicated activities. Materials research tasks were targeted in five areas: (1) Thermal management materials, (2) propulsion materials, (3) materials characterization, (4) vehicle health monitoring materials, and (5) structural materials. Selected tasks were scheduled for completion such that these new materials could be incorporated into customer development plans.
25 CFR 163.70 - Purpose of agreements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...
25 CFR 163.70 - Purpose of agreements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...
25 CFR 163.70 - Purpose of agreements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...
25 CFR 163.70 - Purpose of agreements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...
25 CFR 163.70 - Purpose of agreements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...
Tunesi, Simonetta; Baroni, Sergio; Boarini, Sandro
2016-09-01
The results of this case study are used to argue that waste management planning should follow a detailed process, adequately confronting the complexity of the waste management problems and the specificity of each urban area and of regional/national situations. To support the development or completion of integrated waste management systems, this article proposes a planning method based on: (1) the detailed analysis of waste flows and (2) the application of a life cycle assessment to compare alternative scenarios and optimise solutions. The evolution of the City of Bologna waste management system is used to show how this approach can be applied to assess which elements improve environmental performance. The assessment of the contribution of each waste management phase in the Bologna integrated waste management system has proven that the changes applied from 2013 to 2017 result in a significant improvement of the environmental performance mainly as a consequence of the optimised integration between materials and energy recovery: Global Warming Potential at 100 years (GWP100) diminishes from 21,949 to -11,169 t CO2-eq y(-1) and abiotic resources depletion from -403 to -520 t antimony-eq. y(-1) This study analyses at great detail the collection phase. Outcomes provide specific operational recommendations to policy makers, showing the: (a) relevance of the choice of the materials forming the bags for 'door to door' collection (for non-recycled low-density polyethylene bags 22 kg CO2-eq (tonne of waste)(-1)); (b) relatively low environmental impacts associated with underground tanks (3.9 kg CO2-eq (tonne of waste)(-1)); (c) relatively low impact of big street containers with respect to plastic bags (2.6 kg CO2-eq. (tonne of waste)(-1)). © The Author(s) 2016.
Conference on asbestos control and replacement for electric utilities: Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
An EPRI conference on Asbestos Control and Replacement for Electric Utilities was held April 9, 1992 in conjunction with the National Asbestos Council`s Environmental Management 192 Conference and Exposition. The high cost and potential liabilities of asbestos removal projects, compounded by concerns over the health effects of asbestos replacement materials, was the main motivation for the conference. The objective of the conference was to assemble guidance and information that will help utilities manage asbestos and to effectively prioritize EPRI research in this area. Ten papers covered such topics as computer-aided asbestos management, utility experience with asbestos management, asbestos monitoring andmore » disposal, and asbestos replacement materials. Utility feedback received at the conference indicates that present and planned EPRI research activities in this area will effectively meet industry needs.« less
It Systems Supporting the Management of Production Capacity
NASA Astrophysics Data System (ADS)
Milewska, Elżbieta
2017-03-01
The paper presents the problem of manufacturing process flexibility in view of a company's material and information flow stream management. The author of the article has described the functions of a production process control system and presented the characteristics of production capacity intensive and extensive reserves. The MRP II/ERP, MES and APS class IT tools supporting the process of production planning, organization and control have also been discussed.
1991-03-01
Sulfides BT Bioaccumulation Trigger L LP Ccn tract Laboratory Methods COC Chemical of Concern Corps U.S. Army Corps of Engineers cm centimeter cy cubic... Hydrocarbon (Compound) LOD Limit of Detection LPAH Low Molecular Weight Polynuclear Aromatic Hydrocarbon (Compound) MCLP Modified Contract Laboratory Method...Aromatic Hydrocarbons (HPAHs) (8 samples); * Benzofluoranthenes (7 samples); * Anthracene (6 samples); * Benzo(a)anthracene (6 samples); * Dibenzo(a,h
Managing coal combustion residues in mines
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2006-07-01
Burning coal in electric utility plants produces, in addition to power, residues that contain constituents which may be harmful to the environment. The management of large volumes of coal combustion residues (CCRs) is a challenge for utilities, because they must either place the CCRs in landfills, surface impoundments, or mines, or find alternative uses for the material. This study focuses on the placement of CCRs in active and abandoned coal mines. The Committee on Mine Placement of Coal Combustion Wastes of the National Research Council believes that placement of CCRs in mines as part of the reclamation process may bemore » a viable option for the disposal of this material as long as the placement is properly planned and carried out in a manner that avoids significant adverse environmental and health impacts. This report discusses a variety of steps that are involved in planning and managing the use of CCRs as minefills, including an integrated process of CCR characterization and site characterization, management and engineering design of placement activities, and design and implementation of monitoring to reduce the risk of contamination moving from the mine site to the ambient environment. Enforceable federal standards are needed for the disposal of CCRs in minefills to ensure that states have adequate, explicit authority and that they implement minimum safeguards. 267 refs., 6 apps.« less
Easy-to-read consumer communications: a missing link in Medicaid managed care.
Root, J; Stableford, S
1999-02-01
Effective consumer communication is key to successfully moving Medicaid recipients into managed care systems and realizing the promised cost savings from the upheaval. Yet, little attention has been paid to educating these consumers with easy-to-read materials. The Maine Area Health Education Center (AHEC) Health Literacy Center, with the support of the Center for Health Care Strategies, Inc., addressed the problem by offering three national skills training workshops called Writing for the Medicaid Market. The training was marketed to public and private organizations providing Medicaid managed care services, including state Medicaid officials, health benefit counselor staff (enrollment brokers), managed care plan (HMO) staff, and consumer advocates. The training addressed the core issue in health literacy: the mismatch between the low literacy skills of the target population and the high reading level of most health and managed care materials. Posttraining survey data revealed that training was successful in skill building, but also that it addressed only the tip of the iceberg. Faulty and/or nonexistent communication planning limits the success not only of Medicaid, but of other large health and social programs as well. The authors outline the broad scope of the national health literacy problem, share their posttraining survey data, discuss lessons extrapolated from both their data and their experience, and propose a national agenda to address a vast and generally ignored public problem.
Production roll out plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects,more » General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.« less
ERIC Educational Resources Information Center
Pinkerton, Richard LaDoyt
The objective of this research was to identify the necessary educational organization required to form a curriculum plan for the field of purchasing and to investigate the nature of the industrial purchasing function. The dissertation delineates the critical areas of business operation: industrial purchasing, procurement, and material management.…
Division File of Extension Research Materials; Additions During 1968.
ERIC Educational Resources Information Center
Byrn, Darcie, Comp.
In this annotated bibliography of acquisitions during 1968 appear 265 Extension studies on administrative organization and management; training and staff development; mobilizing participation in Extension work; local leadership; program content and planning procedures; general effectiveness and progress in Extension; teaching methods, techniques,…
Smith, A F; Wild, C; Law, J
2005-04-01
To document the organisational response of Furness General Hospital to the large outbreak of legionnaire's disease in April 2002 and assess the contribution made by the hospital's major incident plan. Qualitative analysis of interview transcripts and written comments from some staff involved in the management of the incident. Documentary analysis of major incident plan and other written materials. The incident posed considerable managerial and clinical problems and this paper describes how they were overcome. In particular, strategies for dealing with supply (of staff, beds, and resources) and managing demand (by liaising with primary care and the public) seem to have been successful. Many functions necessary for managing the incident were poorly dealt with in the plan, especially procedures for handling the news media and liaison with agencies outside the hospital. Lack of explicit guidance appeared not to hinder the organisational response. There may have been an unspoken high level decision to allow staff to draw on their skills and experience in improvising a response to the initial challenge and learning adaptively as the incident unfolded. There was also evidence that staff disregarded existing job and role boundaries and focused instead on tasks, working flexibly to ensure that these tasks were completed. Protracted major incidents pose particular management challenges and may benefit from an approach different from that set out in typical major incident plans. Staff must be able to act flexibly and responsively. Some form of checklist or toolkit may be preferable to a detailed plan for some types of incident.
Smith, A; Wild, C; Law, J
2005-01-01
Objective: To document the organisational response of Furness General Hospital to the large outbreak of legionnaire's disease in April 2002 and assess the contribution made by the hospital's major incident plan. Method: Qualitative analysis of interview transcripts and written comments from some staff involved in the management of the incident. Documentary analysis of major incident plan and other written materials. Results: The incident posed considerable managerial and clinical problems and this paper describes how they were overcome. In particular, strategies for dealing with supply (of staff, beds, and resources) and managing demand (by liaising with primary care and the public) seem to have been successful. Many functions necessary for managing the incident were poorly dealt with in the plan, especially procedures for handling the news media and liaison with agencies outside the hospital. Lack of explicit guidance appeared not to hinder the organisational response. There may have been an unspoken high level decision to allow staff to draw on their skills and experience in improvising a response to the initial challenge and learning adaptively as the incident unfolded. There was also evidence that staff disregarded existing job and role boundaries and focused instead on tasks, working flexibly to ensure that these tasks were completed. Conclusions: Protracted major incidents pose particular management challenges and may benefit from an approach different from that set out in typical major incident plans. Staff must be able to act flexibly and responsively. Some form of checklist or toolkit may be preferable to a detailed plan for some types of incident. PMID:15788822
Liu, Chung-Feng; Kuo, Kuang-Ming
2016-05-01
Self-care management is becoming an important part of care for chronic patients. However, various kinds of self-management educational materials which government or healthcare institutions provide for patients may not achieve the expected outcome. One of the critical reasons affecting patients' use intention could be patients' perceived information overload regarding the self-management educational materials. This study proposed an extended model of the Theory of Planned Behavior (TPB), which incorporated perceived information overload, to explore if information overload will prevent chronic patients from reading educational materials for self-care management. The independent variables are attitude, subject norm, perceived behavior control and perceived information overload while the dependent variable is behavior intention to use the self-management educational materials. Perceived information overload is also referred to as an antecedent variable which may has impacts on attitude and perceived behavior control. The cross-sectional study interviewed newly diagnosed chronic patients with coronary artery disease, who are the potential users of the self-management educational materials, in a medical center in Taiwan. Data were analyzed using descriptive statistics of the basic information distribution of the respondents, and structural equation modeling to study the reliability and validity for testing hypotheses. A total of 110 respondents were enrolled in this study and successful interview data were collected from 106 respondents. The result indicates that the patients' perceived information overload of self-management educational materials was validated to have impacts on attitude and perceived behavioral control constructs of the TPB as well as contributing a direct impact on patients' intentions to use self-management educational materials. Besides, subjective norm and perceived behavioral control constructs were validated to have significant impacts on behavioral intentions, whereas the attitude construct was not. Finally, the relationships between information overload and attitude, information overload and intention, subjective norm and intention, as well as perceived behavioral control and intention varied significantly between highly- and less-educated respondents. Differing self-management educational materials for respondents of various educational levels could be formulated to substantially boost the use of self-management educational materials. This study demonstrated a comprehensive framework, which extended perceived information overload into the TPB model, to predict patients' behavioral intention of using self-management educational materials. We expect the results of this study will provide useful insights for studying self-management educational materials usage and information overload from the perspectives of academia, governments, and healthcare providers. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
The central equipment pool, an opportunity for improved technology management.
Gentles, W M
2000-01-01
A model for a central equipment pool managed by a clinical engineering department has been presented. The advantages to patient care and to the clinical engineering department are many. The distribution of portable technology that has been traditionally managed by the materials management function is a logical match to the expanding role of clinical engineering departments in technology management. Accurate asset management tools have allowed us to provide reliable measures of infusion pump utilization, permitting us to predict future needs as programs expand. Thus we are more actively involved in strategic technology planning. The central equipment pool is an excellent opportunity for the clinical engineering department to increase its technology management activities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwager, K.; Green, T. M.
The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened,more » and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.« less
Amey, E.B.; Russell, J.A.; Hurdelbrink, R.J.
1996-01-01
In 1976, the U.S. Congress enacted the Resource Conservation and Recovery Act (RCRA) to further address the problem of increasing industrial and municipal waste. The main objectives of RCRA were to responsibly manage hazardous and solid waste and to procure materials made from recovered wastes. To fulfill these objectives, four main programs of waste management were developed. These programs were defined under Subtitle C, the Hazardous Waste Program; Subtitle D, the Solid Waste Program; Subtitle I, the Underground Storage Tank Program; and Subtitle J, the Medical Waste Program. Subtitle D illustrates the solid waste dilemma occurring in the United States. Under this program, states are encouraged to develop and implement their own waste management plans. These plans include the promotion of recycling solid wastes and the closing and upgrading of all environmentally unsound dumps. ?? 1996 International Association for Mathematical Geology.
The Space Station Freedom - International cooperation and innovation in space safety
NASA Technical Reports Server (NTRS)
Rodney, George A.
1989-01-01
The Space Station Freedom (SSF) being developed by the United States, European Space Agency (ESA), Japan, and Canada poses novel safety challenges in design, operations, logistics, and program management. A brief overview discloses many features that make SSF a radical departure from earlier low earth orbit (LEO) space stations relative to safety management: size and power levels; multiphase manned assembly; 30-year planned lifetime, with embedded 'hooks and scars' forevolution; crew size and skill-mix variability; sustained logistical dependence; use of man, robotics and telepresence for on-orbit maintenance of station and free-flyer systems; closed-environment recycling; use of automation and expert systems; long-term operation of collocated life-sciences and materials-science experiments, requiring control and segregation of hazardous and chemically incompatible materials; and materials aging in space.
Restoring Western Ranges and Wildlands, vol. 2
Stephen B. Monsen; Richard Stevens; Nancy L. Shaw
2004-01-01
This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...
Berkeley Lab - Materials Sciences Division
MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & , Travel, Property Rosemary Williams, Purchasing & Time Keeper 510-495-2645 66-238 rmwilliams@lbl.gov Jasmine Harris, Travel & Property 510-486-6303 66-237 jaharris@lbl.gov Gil Torres, Building Manager
Manual for a Volunteer Services System.
ERIC Educational Resources Information Center
Helgerson, Linda; And Others
This manual presents guidelines for planning, monitoring, and controlling the development and operation of volunteer assistance programs. The materials included address questions related to both the process of establishing a volunteer program and the administration of a volunteer management system. The manual is not intended to provide a blueprint…
BUYING AND SELLING A SMALL BUSINESS.
Part One takes the form of a manual of the processes and techniques of buying and selling a small business . This material is presented in a...finalizing the transaction and planning for operation under new ownership and management . Part Two reports the nature of the research conducted during the
Restoring Western Ranges and Wildlands, vol. 3
Stephen B. Monsen; Richard Stevens; Nancy L. Shaw
2004-01-01
This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...
Restoring Western Ranges and Wildlands, vol. 1
Stephen B. Monsen; Richard Stevens; Nancy L. Shaw
2004-01-01
This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...
2014 Zero Waste Strategic Plan Executive Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wrons, Ralph J.
Sandia National Laboratories/New Mexico is located in Albuquerque, New Mexico, primarily on Department of Energy (DOE) permitted land on approximately 2,800 acres of Kirtland Air Force Base. There are approximately 5.5 million square feet of buildings, with a workforce of approximately 9200 personnel. Sandia National Laboratories Materials Sustainability and Pollution Prevention (MSP2) program adopted in 2008 an internal team goal for New Mexico site operations for Zero Waste to Landfill by 2025. Sandia solicited a consultant to assist in the development of a Zero Waste Strategic Plan. The Zero Waste Consultant Team selected is a partnership of SBM Management Servicesmore » and Gary Liss & Associates. The scope of this Plan is non-hazardous solid waste and covers the life cycle of material purchases to the use and final disposal of the items at the end of their life cycle.« less
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, technicians install the second Materials International Space Station Experiments, or MISSE, in space shuttle Endeavour's payload bay. The MISSE is part of the payload onboard Endeavour for mission STS-123. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
Strategic Energy Management Plan for the Santa Ynez Band of Chumash Indians
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davenport, Lars; Smythe, Louisa; Sarquilla, Lindsey
2015-03-27
This plan outlines the Santa Ynez Band of Chumash Indians’ comprehensive energy management strategy including an assessment of current practices, a commitment to improving energy performance and reducing overall energy use, and recommended actions to achieve these goals. Vision Statement The primary objective of the Strategic Energy Management Plan is to implement energy efficiency, energy security, conservation, education, and renewable energy projects that align with the economic goals and cultural values of the community to improve the health and welfare of the tribe. The intended outcomes of implementing the energy plan include job creation, capacity building, and reduced energy costsmore » for tribal community members, and tribal operations. By encouraging energy independence and local power production the plan will promote self-sufficiency. Mission & Objectives The Strategic Energy Plan will provide information and suggestions to guide tribal decision-making and provide a foundation for effective management of energy resources within the Santa Ynez Band of Chumash Indians (SYBCI) community. The objectives of developing this plan include; Assess current energy demand and costs of all tribal enterprises, offices, and facilities; Provide a baseline assessment of the SYBCI’s energy resources so that future progress can be clearly and consistently measured, and current usage better understood; Project future energy demand; Establish a system for centralized, ongoing tracking and analysis of tribal energy data that is applicable across sectors, facilities, and activities; Develop a unifying vision that is consistent with the tribe’s long-term cultural, social, environmental, and economic goals; Identify and evaluate the potential of opportunities for development of long-term, cost effective energy sources, such as renewable energy, energy efficiency and conservation, and other feasible supply- and demand-side options; and Build the SYBCI’s capacity for understanding, managing, and developing energy resources by identifying training, distribution of information materials, and community meeting needs and opportunities« less
Zaccariello, Lucio; Cremiato, Raffaele; Mastellone, Maria Laura
2015-10-01
The main role of a waste management plan is to define which is the combination of waste management strategies and method needed to collect and manage the waste in such a way to ensure a given set of targets is reached. Objectives have to be sustainable and realistic, consistent with the environmental policies and regulations and monitored to verify the progressive achievement of the given targets. To get the aim, the setting up and quantification of indicators can allow the measurement of efficiency of a waste management system. The quantification of efficiency indicators requires the developing of a material flow analysis over the system boundary, from waste collection to secondary materials selling, processing and disposal. The material flow analysis has been carried out with reference to a case study for which a reliable, time- and site-specific database was available. The material flow analysis allowed the evaluation of the amount of materials sent to recycling, to landfilling and to waste-to-energy, by highlighting that the sorting of residual waste can further increase the secondary materials amount. The utilisation of energy recovery to treat the low-grade waste allows the maximisation of waste diversion from landfill with a low production of hazardous ash. A preliminary economic balance has been carried out to define the gate fee of the waste management system that was in the range of 84-145 € t(-1) without including the separate collection cost. The cost of door-by-door separate collection, designed to ensure the collection of five separate streams, resulted in 250 € t(-1) ±30%. © The Author(s) 2015.
Management of the aging of critical safety-related concrete structures in light-water reactor plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naus, D.J.; Oland, C.B.; Arndt, E.G.
1990-01-01
The Structural Aging Program has the overall objective of providing the USNRC with an improved basis for evaluating nuclear power plant safety-related structures for continued service. The program consists of a management task and three technical tasks: materials property data base, structural component assessment/repair technology, and quantitative methodology for continued-service determinations. Objectives, accomplishments, and planned activities under each of these tasks are presented. Major program accomplishments include development of a materials property data base for structural materials as well as an aging assessment methodology for concrete structures in nuclear power plants. Furthermore, a review and assessment of inservice inspection techniquesmore » for concrete materials and structures has been complete, and work on development of a methodology which can be used for performing current as well as reliability-based future condition assessment of concrete structures is well under way. 43 refs., 3 tabs.« less
NASA Astrophysics Data System (ADS)
Curci, Vita; Dassisti, Michele; Josefa, Mula Bru; Manuel, Díaz Madroñero
2014-10-01
Supply chain model (SCM) are potentially capable to integrate different aspects in supporting decision making for enterprise management tasks. The aim of the paper is to propose an hybrid mathematical programming model for optimization of production requirements resources planning. The preliminary model was conceived bottom-up from a real industrial case analysed oriented to maximize cash flow. Despite the intense computational effort required to converge to a solution, optimisation done brought good result in solving the objective function.
Effing, Tanja W; Lenferink, Anke; Buckman, Julie; Spicer, Deborah; Cafarella, Paul A; Burt, Morton G; Bassett, Katherine L; van Ommeren, Clara; Anesbury, Sally; van der Valk, Paul D L P M; Frith, Peter A; van der Palen, Job
2014-11-01
Patient-initiated action plans are an important component of COPD self-management (SM) interventions. When integrated into SM interventions, these action plans have proven to be effective in reducing exacerbation severity, hospitalisations, and costs and in improving health status in patients with COPD without severe comorbidities. Because of overlap in symptoms, a self-treatment (ST) approach that focuses solely on traditional symptoms of COPD is inadequate for patients with COPD and comorbidities. The COPE-III SM intervention combines (I) patient-initiated action plans that are tailored to the individual's co-morbid disease(s), and (II) ongoing nurse support. In this paper we provide information regarding the integration of information from two previous COPD SM studies (COPE I and II) in the development of the current COPE-III ST approach. COPE-III ST materials include daily symptom diaries and action plans that take patient's common comorbidities [chronic heart failure (CHF), anxiety, depression, ischaemic heart disease (IHD), and diabetes] into account. The comorbid diary and action plans components were developed in collaboration with multiple disease-experts. Previous SM studies have highlighted some essential topics that need to be considered when developing a SM or ST approach: 'when to initiate ST', 'how to optimize materials and safety', and 'how to achieve behavioural change'. In the COPE-III study, ST is initiated after a significant change in symptoms. This is consistent with the COPE-II approach and was implemented because disease symptoms are often present even when patients are stable. We have tried to ensure patient safety by providing an easily accessible case-manager to patients throughout their involvement in the study. Furthermore, a psychologist has ensured the use of behavioural change techniques throughout the intervention. We should continue to learn from our experiences with SM interventions to further optimize future SM and ST interventions. The use of materials that are suitable for different levels of patient literacy and the training of health care providers are other points of improvement.
In-Service Training Materials for Teachers of the Educable Mentally Retarded. Session III.
ERIC Educational Resources Information Center
Meyen, Edward L.; Carr, Donald L.
Supplementing language arts for the educable mentally handicapped, the guide provides a representative unit on newspapers with core area activities, vocabulary, and 33 lesson plans. Sub-topics include community orientation, occupations, leisure time and recreation, weather, local history, money management, homemaking and home repair,…
ERIC Educational Resources Information Center
Tatsuki, Donna
Popular films can be used successfully in a wide range of language, content, and culture classes. Creating support materials in order to use a movie in such a class is an enormous task, but with careful planning it can be broken into four manageable components: contemplation, selection, segmentation, and construction. This brief paper provides a…
34 CFR 429.31 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... information that shows— (i) High quality in the design of the project; (ii) An effective plan of management... looks for information that shows methods of evaluation that are appropriate for the project and, to the... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION BILINGUAL VOCATIONAL MATERIALS, METHODS, AND...
DOT National Transportation Integrated Search
2006-02-01
Highway design engineers in the U.S. have been relying on the 1986-1993 American Association of State Highway : and Transportation Officials (AASHTO) Design Guide, which is based on the many empirical elements obtained in : the 40-year old AASTHO Roa...
A Curriculum Management Model for State Vocational Education Agencies
ERIC Educational Resources Information Center
Frantz, Nevin R.
1976-01-01
Emphasis is placed on the managerial roles at the organizational level and in particular the role of a curriculum coordinator in planning, organizing and controlling the resources needed to develop, install, continuously evaluate and modify curriculum materials used by teachers of vocational and career education in local educational agencies.…
Two Year Core Curriculum for Agricultural Education in Montana. Revised.
ERIC Educational Resources Information Center
Montana State Univ., Bozeman. Dept. of Agricultural and Industrial Education.
This core curriculum consists of materials for use in conducting a two-year secondary level agricultural education course. Addressed in the individual units of the guide are the following topics: leadership; agricultural career planning; supervised occupational experience programs (SOEPs); agricultural mechanics (shop management and safety,…
76 FR 22717 - Collection of Information Under Review by Office of Management and Budget
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... Permit to Handle Hazardous Materials, 1625-0024, Safety Approval of Cargo Containers, 1625-0036, Plan.... 2. Title: Safety Approval of Cargo Containers. OMB Control Number: 1625-0024. Type of Request... collection is associated with requirements for owners and manufacturers of cargo containers to submit...
Code of Federal Regulations, 2013 CFR
2013-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
Transportation Systems. TE8126. Technology Education.
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational and Technical Education Services.
This curriculum guide has been developed as a resource for teachers (especially in North Carolina) to use in planning and implementing a competency-based instructional management technology program in their schools. The guide contains three main section. The first section contains introductory materials and a course blueprint that lists the…
49 CFR 192.1007 - What are the required elements of an integrity management plan?
Code of Federal Regulations, 2010 CFR
2010-10-01
... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas... threats and risks to its gas distribution pipeline. (2) Consider the information gained from past design...
Lahou, Evy; Jacxsens, Liesbeth; Van Landeghem, Filip; Uyttendaele, Mieke
2014-08-01
Food service operations are confronted with a diverse range of raw materials and served meals. The implementation of a microbial sampling plan in the framework of verification of suppliers and their own production process (functionality of their prerequisite and HACCP program), demands selection of food products and sampling frequencies. However, these are often selected without a well described scientifically underpinned sampling plan. Therefore, an approach on how to set-up a focused sampling plan, enabled by a microbial risk categorization of food products, for both incoming raw materials and meals served to the consumers is presented. The sampling plan was implemented as a case study during a one-year period in an institutional food service operation to test the feasibility of the chosen approach. This resulted in 123 samples of raw materials and 87 samples of meal servings (focused on high risk categorized food products) which were analyzed for spoilage bacteria, hygiene indicators and food borne pathogens. Although sampling plans are intrinsically limited in assessing the quality and safety of sampled foods, it was shown to be useful to reveal major non-compliances and opportunities to improve the food safety management system in place. Points of attention deduced in the case study were control of Listeria monocytogenes in raw meat spread and raw fish as well as overall microbial quality of served sandwiches and salads. Copyright © 2014 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg
The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.
NIF Operations Management Plan, August 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wonterghem, Bruno M.
Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less
Zhang, Hui; Duan, Huabo; Zuo, Jian; Song, MingWei; Zhang, Yukui; Yang, Bo; Niu, Yongning
2017-09-01
Hazardous Materials Incidents (HMIs) have attracted a growing public concern worldwide. The health risks and environmental implications associated with HMIs are almost invariably severe, and underscore the urgency for sound management. Hazardous Materials Explosion incidents (HMEIs) belong to a category of extremely serious HMIs. Existing studies placed focuses predominately on the promptness and efficiency of emergency responses to HMIs and HMEIs. By contrast, post-disaster environmental management has been largely overlooked. Very few studies attempted to examine the post-disaster environmental management plan particularly its effectiveness and sufficiency. In the event of the Tianjin warehouse explosion (TWE), apart from the immediate emergency response, the post-disaster environmental management systems (P-EMSs) have been reported to be effective and sufficient in dealing with the environmental concerns. Therefore, this study aims to critically investigate the P-EMSs for the TWE, and consequently to propose a framework and procedures for P-EMSs in general for HMIs, particularly for HMEIs. These findings provide a useful reference to develop P-EMSs for HMIs in the future, not only in China but also other countries. Copyright © 2017. Published by Elsevier Ltd.
1991-05-01
Overview of Environmental Laws and Regulations 24 NEPA Process and Environmental Audit and Assessment 27 Air Emissions 27 Hazardous Materials...25 5 Overview of Environmental Laws and Regulations Training-U.S. Army Context Training 26 6 NEPA Review Process and Environmental Audit and...and environmental audit /assessment 4. Air emissions 5. Hazardous materials and waste management a. Polychlorinated biphenyls (PCBs) b. Petroleum, oil
1990-11-01
radioactive) - Determine class of HAZMAT (Class A Explosive, Class B Explosive, Class C Explosive, Blasting Agent , Flammable Gas , Non- flammable Gas ... agent . Specific health and safety plans related to IRP actions amy be obtained from the same source. 2. Interaction of Fire Departments with the...such as digging near a gas line, a fuel tank, or buried explo- sives, the fire department would be briefed before beginning the work, and, under
Materials Requirements Planning: An Organizational Perspective.
1980-03-01
Effective management of raw material and semi-finished production inventories has been a subject of increasing con- cern in both public and private sector...PERSPECTIVE by Frederick A. Braman March 1980 Thesis Advisor: R.W. Sagehorn Approved for public release; distribution unlimited. s 039 , 80 3 039...A00111SWOa v~trafft is m C #Mh.5nd Gift*.) Is. SCUMIT’r CLASS. (e lneiefteel 16. 015? mamUTlON STA?3MCN?4 (of this Reeeet) Approved for public
Awards to academic institutions by the Department of Transportation in FY 1975
DOE Office of Scientific and Technical Information (OSTI.GOV)
Megerian, G.K.; Whitfield, H.L.
1976-02-20
A comprehensive listing is given of contracts and grants awarded by the Department of Transportation to colleges and universities during fiscal year 1975. The awards are categorized into seven different schemes. Subject areas include (1) carpooling; (2) problems of the elderly and the handicapped; (3) energy; (4) environment; (5) facilities and services; (6) Federal Government role; (7) freight movement; (8) human factors; (9) land use planning; (10) management; (11) materials; (12) motorcycles; (13) noise; (14) personal rapid transit; (15) rural planning; (16) safety; (17) systems development; (18) taxicabs; (19) technology; (20) traffic control; (21) training; (22) tunneling; and (23) urbanmore » planning. (PMA)« less
NASA Technical Reports Server (NTRS)
1979-01-01
Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.
Simic, Vladimir
2016-06-01
As the number of end-of-life vehicles (ELVs) is estimated to increase to 79.3 million units per year by 2020 (e.g., 40 million units were generated in 2010), there is strong motivation to effectively manage this fast-growing waste flow. Intensive work on management of ELVs is necessary in order to more successfully tackle this important environmental challenge. This paper proposes an interval-parameter chance-constraint programming model for end-of-life vehicles management under rigorous environmental regulations. The proposed model can incorporate various uncertainty information in the modeling process. The complex relationships between different ELV management sub-systems are successfully addressed. Particularly, the formulated model can help identify optimal patterns of procurement from multiple sources of ELV supply, production and inventory planning in multiple vehicle recycling factories, and allocation of sorted material flows to multiple final destinations under rigorous environmental regulations. A case study is conducted in order to demonstrate the potentials and applicability of the proposed model. Various constraint-violation probability levels are examined in detail. Influences of parameter uncertainty on model solutions are thoroughly investigated. Useful solutions for the management of ELVs are obtained under different probabilities of violating system constraints. The formulated model is able to tackle a hard, uncertainty existing ELV management problem. The presented model has advantages in providing bases for determining long-term ELV management plans with desired compromises between economic efficiency of vehicle recycling system and system-reliability considerations. The results are helpful for supporting generation and improvement of ELV management plans. Copyright © 2016 Elsevier Ltd. All rights reserved.
Building 9401-2 Plating Shop Surveillance and Maintenance Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1999-05-01
This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes,more » and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.« less
A BIM-based system for demolition and renovation waste estimation and planning.
Cheng, Jack C P; Ma, Lauren Y H
2013-06-01
Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.
Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.
Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S
2001-01-01
The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parkes, Olga, E-mail: o.parkes@ucl.ac.uk; Lettieri, Paola, E-mail: p.lettieri@ucl.ac.uk; Bogle, I. David L.
Highlights: • Application of LCA in planning integrated waste management systems. • Environmental valuation of 3 legacy scenarios for the Olympic Park. • Hot-spot analysis highlights the importance of energy and materials recovery. • Most environmental savings are achieved through materials recycling. • Sensitivity analysis shows importance of waste composition and recycling rates. - Abstract: This paper presents the results of the life cycle assessment (LCA) of 10 integrated waste management systems (IWMSs) for 3 potential post-event site design scenarios of the London Olympic Park. The aim of the LCA study is to evaluate direct and indirect emissions resulting frommore » various treatment options of municipal solid waste (MSW) annually generated on site together with avoided emissions resulting from energy, materials and nutrients recovery. IWMSs are modelled using GaBi v6.0 Product Sustainability software and results are presented based on the CML (v.Nov-10) characterisation method. The results show that IWMSs with advanced thermal treatment (ATT) and incineration with energy recovery have the lowest Global Warming Potential (GWP) than IWMSs where landfill is the primary waste treatment process. This is due to higher direct emissions and lower avoided emissions from the landfill process compared to the emissions from the thermal treatment processes. LCA results demonstrate that significant environmental savings are achieved through substitution of virgin materials with recycled ones. The results of the sensitivity analysis carried out for IWMS 1 shows that increasing recycling rate by 5%, 10% and 15% compared to the baseline scenario can reduce GWP by 8%, 17% and 25% respectively. Sensitivity analysis also shows how changes in waste composition affect the overall result of the system. The outcomes of such assessments provide decision-makers with fundamental information regarding the environmental impacts of different waste treatment options necessary for sustainable waste management planning.« less
Burn Injury and Explosions: An Australian Perspective
Greenwood, John E.
2009-01-01
Objectives: Increasingly (but not exclusively), terrorist activity and the use of explosive devices have enjoyed the focus of the global media. This paper aims to bring a range of issues to attention, to highlight how burn injuries are sustained in such incidents and why burn injuries (and thus burn disasters) are so complicated to manage. Materials and Methods: The author's experience with burn injury caused during explosions and his involvement in burn disaster situations has been summarized to form the basis of the article. This has been expanded upon with discussion points which provide a strategy for planning for such events and by a broad sample of the literature. Results: Several strategies are suggested to facilitate planning for burn disasters and to illustrate to those not directly involved why forward planning is pivotal to success when these incidents occur. Conclusions: Disasters generating large numbers of burn-injured are relatively frequent. Explosive devices are widespread in their use both in military and increasingly in civilian fields. Encompassing a large range of aetiologies, geographical sites, populations, and resources; burn disaster management is difficult and planning essential. PMID:19834533
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, one of two Materials International Space Station Experiments, or MISSE, is lowered into space shuttle Endeavour's payload bay for installation. The MISSE is part of the payload onboard Endeavour for mission STS-123. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, the second of two Materials International Space Station Experiments, or MISSE, is lowered into space shuttle Endeavour's payload bay for installation. The MISSE is part of the payload onboard Endeavour for mission STS-123. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, one of two Materials International Space Station Experiments, or MISSE, is lowered into space shuttle Endeavour's payload bay for installation. The MISSE is part of the payload onboard Endeavour for mission STS-123. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
Emergency Medical Technician-Ambulance: National Standard Curriculum. Course Guide (Third Edition).
ERIC Educational Resources Information Center
National Highway Traffic Safety Administration (DOT), Washington, DC.
This course guide is intended to assist course coordinators in planning and managing a course to train emergency medical technicians to work with ambulance or other specialized rescue services. Materials are presented to enable students to perform the following functions: recognize the nature and seriousness of the patient's condition or extent of…
Abstract: Waste and materials manage¬ment, land use planning, transportation and infrastructure, including water and energy can have indirect or direct beneficial impact on the environment and public health. The potential for impact however, is rarely viewed in an integrated fas...
Success for All: Evaluation Report and Executive Summary
ERIC Educational Resources Information Center
Miller, Sarah; Biggart, Andy; Sloan, Seaneen; O'Hare, Liam
2017-01-01
Success for All (SfA) is a whole-school approach to improving literacy in primary schools. Teachers receive training in areas including group learning strategies, phonics, and assessment, and are provided with structured daily lesson plans and teaching materials. There is also support for school leadership in areas such as data management, ability…
Construction Systems. Curriculum Guide for Technology Education.
ERIC Educational Resources Information Center
Spencer, Albert G.
This curriculum guide for a 1-semester or 1-year course on construction systems is designed to acquaint students with the nature of the construction industry and its technology--tools, materials, and methods of construction--as well as the systems for planning and managing construction projects. The guide contains a course outline, competencies…
ERIC Educational Resources Information Center
Frey, Nancy
2010-01-01
This popular guide offers a wealth of innovative, research-based strategies for making K-12 classrooms the best learning environments they can be. Easy-to-implement best practices are presented for establishing a classroom management plan, organizing procedures and materials, building a respectful community, fostering peer collaboration, and…
75 FR 50779 - Notice of Public Meeting, John Day/Snake Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-17
... National Forest's travel management alternatives, the Blue Mountain Forest Plan Revision alternatives, and..., located at 3502 Highway 30, La Grande, Oregon 97850. For a copy of material to be discussed or the... District Office, 3050 NE Third, Prineville, Oregon 97754, (541) 416-6889 or e-mail: christina_lilienthal...
Comparison between Kemp, Smith & Ragan, Dick & Carey's Instructional Design Models
ERIC Educational Resources Information Center
Birgili, Bengi
2013-01-01
Instructional design (ID) is systematic way of suggesting a structure and giving meaning to an instructional problem by helping to visualize the problem and breaking into discrete and manageable units. In addition, ID is a systematic reflective process of applying instructional principles into plans by material, activity, resources and evaluation…
Franchising. Instructor's Manual.
ERIC Educational Resources Information Center
Litecky, Paul A.
The third booklet in a second series of subject presentations intended to advance the effectiveness of small business management is presented. The lecture is designed as the basis for a presentation to the businessman in nontechnical language. The Lesson Plan is an outline of the material covered which may be used as a teaching guide or as a…
Transportation Institutional Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader'smore » convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.« less
,
2015-01-01
The general consideration for implementation of the GCMS is that all active USGS geologic sample repositories will form the core of GCMS and that participating science centers will develop procedures based on proposed GCMS methodologies. The GCMS is a collective resource for the entire USGS community and the users who discover the geologic materials kept in these repositories and seek to access them.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nichols, Will E.; Mehta, Sunil
The updated Hanford Site Composite Analysis will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at Hanford following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1-1, Radioactive Waste Management (DOE, 2001), related to managing low-level waste disposal facilities at the Hanford Site.
2014-01-01
Memorandum QBO quantity by owner RAPS Rotables Allocation and Planning System RBOM repair bill of materials RC Recoverability Code RI Rock Island RMC...Service-owned inventory on hand in DLA distribution centers was determined using the DLA Quantity by Owner ( QBO ) file, which records the amount of...on analysis of DLA QBO file data). 4 DoD Depot-Level Reparable Supply Chain Management Budget (OMB) guidance is also very low4 and some argue
Life Sciences Research Facility automation requirements and concepts for the Space Station
NASA Technical Reports Server (NTRS)
Rasmussen, Daryl N.
1986-01-01
An evaluation is made of the methods and preliminary results of a study on prospects for the automation of the NASA Space Station's Life Sciences Research Facility. In order to remain within current Space Station resource allocations, approximately 85 percent of planned life science experiment tasks must be automated; these tasks encompass specimen care and feeding, cage and instrument cleaning, data acquisition and control, sample analysis, waste management, instrument calibration, materials inventory and management, and janitorial work. Task automation will free crews for specimen manipulation, tissue sampling, data interpretation and communication with ground controllers, and experiment management.
Adaptation Design Tool for Climate-Smart Management of Coral Reefs and Other Natural Resources.
West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Gibbs, David A; Bradley, Patricia; Julius, Susan H
2018-06-22
Scientists and managers of natural resources have recognized an urgent need for improved methods and tools to enable effective adaptation of management measures in the face of climate change. This paper presents an Adaptation Design Tool that uses a structured approach to break down an otherwise overwhelming and complex process into tractable steps. The tool contains worksheets that guide users through a series of design considerations for adapting their planned management actions to be more climate-smart given changing environmental stressors. Also provided with other worksheets is a framework for brainstorming new adaptation options in response to climate threats not yet addressed in the current plan. Developed and tested in collaboration with practitioners in Hawai'i and Puerto Rico using coral reefs as a pilot ecosystem, the tool and associated reference materials consist of worksheets, instructions and lessons-learned from real-world examples. On the basis of stakeholder feedback from expert consultations during tool development, we present insights and recommendations regarding how to maximize tool efficiency, gain the greatest value from the thought process, and deal with issues of scale and uncertainty. We conclude by reflecting on how the tool advances the theory and practice of assessment and decision-making science, informs higher level strategic planning, and serves as a platform for a systematic, transparent and inclusive process to tackle the practical implications of climate change for management of natural resources.
Water Plan 2030: A Dynamic Education Model for Teaching Water Management Issues
NASA Astrophysics Data System (ADS)
Rupprecht, C.; Washburne, J.; Lansey, K.; Williams, A.
2006-12-01
Dynamic educational tools to assist teachers and students in recognizing the impacts of water management decisions in a realistic context are not readily available. Water policy issues are often complex and difficult for students trying to make meaningful connections between system components. To fill this need, we have developed a systems modeling-based educational decision support system (DSS) with supplementary materials. This model, called Water Plan 2030, represents a general semi-arid watershed; it allows users to examine water management alternatives by changing input values for various water uses and basin conditions and immediately receive graphical outputs to compare decisions. The main goal of our DSS model is to foster students' abilities to make knowledgeable decisions with regard to water resources issues. There are two reasons we have developed this model for traditional classroom settings. First, the DSS model provides teachers with a mechanism for educating students about inter-related hydrologic concepts, complex systems and facilitates discussion of water resources issues. Second, Water Plan 2030 encourages student discovery of cause/effect relationships in a dynamic, hands-on environment and develops the ability to realize the implications of water management alternatives. The DSS model has been utilized in an undergraduate, non-major science class for 5 course hours, each of the past 4 semesters. Accompanying the PC-based model are supplementary materials to improve the effectiveness of implementation by emphasizing important concepts and guiding learners through the model components. These materials include in-class tutorials, introductory questions, role-playing activities and homework extensions that have been revised after each user session, based on student and instructor feedback. Most recently, we have developed individual lessons that teach specific model functions and concepts. These modules provide teachers the flexibility to adapt the model to meet numerous teaching goals. Evaluation results indicate that students improved their understanding of fundamental concepts and system interactions and showed the most improvement in questions related to water use by sector and sustainability issues. Model modifications have also improved student feedback of the model effectiveness and user- friendliness. Positive results from this project have created the demand for a web-based version, which will be online in late 2006.
Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes
NASA Astrophysics Data System (ADS)
Cropper, A. E.; Wang, Z.
1995-08-01
Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.
Planning guidance for the Chemical Stockpile Emergency Preparedness Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.
1995-02-01
This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less
Chen, Ruo-Bing
2016-11-01
Globally, there is an increasing incidence of inflammatory bowel disease. It is very important for patients to be involved with self-management that can optimize personal heath behavior to control the disease. The aim of this project was to increase nursing staff knowledge of inflammatory bowel disease discharge guidance, and to improve the quality of education for discharged patients, thereby improving their self-management. A baseline audit was conducted by interviewing 30 patients in the gastroenterology ward of Huadong Hospital, Fudan University. The project utilized the Joanna Briggs Institute's Practical Application of Clinical Evidence System and Getting Research Into Practice audit tools for promoting quality of education and self-management of patients with inflammatory bowel disease. Thirty patients were provided with written materials, which included disease education and information regarding self-management. A post-implementation audit was conducted. There was improvement of education prior to discharge and dietary consultancy in the gastroenterology ward. Self-management plans utilizing written materials only were not sufficient for ensuring sustainability of the project. Comprehensive self-management education can make a contribution to improving awareness of the importance of self-management for patients with inflammatory bowel disease.
Quality of family planning services in primary health centers of Jimma Zone, Southwest Ethiopia.
Tafese, Fikru; Woldie, Mirkuzie; Megerssa, Berhane
2013-11-01
Good quality of care in family planning (FP) services help individuals and couples to meet their reproductive health needs safely and effectively. Therefore, assessment and improvement of the quality of family planning services could enhance family planning services utilization. This study was thus conducted to assess the quality of family planning services in primary health centers of Jimma Zone, Southwest Ethiopia. A cross-sectional facility based study was conducted from March 1(st)-25(th), 2011 among family planning clients of government primary health care centers in southwest Ethiopia. Exit interview of 301 family planning clients identified through systematic random sampling technique was carried out using a pre-tested structured questionnaire. Availability of resources was checked using provider interview and inventory checklist. Moreover, a total of 150 consultation sessions were observed using checklist. Descriptive statistics and linear regression coefficients were generated to meet the objective of the study. There was a shortage of some medical equipment, trained staffs, and information education and communication materials (IEC) in all of the family planning clinics. The mean waiting time at the service delivery points and consultation duration were 16.4 and 10.5 minutes, respectively. The providers used at least one information education and communication material in 33.3% of the consultation sessions. The overall satisfaction score was 8.64. Clients' perception on adequacy of information during consultation (β=0.24; ( 95%CI=0.02-0.16) ease of getting the clinic site, short waiting time (β=0.17; 95%CI=0.15-029) and educational level (β=0.09; 95%CI =0.09-0.29) were significantly associated with overall satisfaction. The findings of this study showed that there was lack of critical resources for the provision of quality family planning services in all of the primary health care centers included in the study. This has affected important aspects of service provision including the use of IEC materials during consultations. Hence, it is advisable that health managers of the health facilities and the district health office ensure improved availability of trained personnel, IEC materials and other supplies at the clinics.
Sanna, M C
1999-03-01
With the objective to describe the evolution of the discipline "Administration Applied to Nursing", in the period from 1980 to 1995, courses' plans texts write by the academic staff responsible for their elaboration and execution were studied. Texts of the items "Objectives and Content" were analyzed under the point of view of Phenomenology, being submitted to the process of analysis of speech defined by Martins and Bicudo. The result of the procedures used in the analysis, allowed the identification of six categories of thinking: Nursing Management, Ideological and Politic Bases for Nursing Management, Comunication as an Instrument to Managing, Management of Physics Resources, Management of Material Resources and Management of Human Resources. The modification in the courses' plans observed during the studied period, evidenced two important moments--one at the end of the eighties, were the reformulation of the ideological basis which the discipline basis was adapted and another at the end of the first five years of the nineties, with curricular reorganization. The identification of this course allowed the follow-up and comprehension of the development of the discipline, providing resources for analysis of the correlated disciplines of the same discipline in other contexts and experiences.
The toilet sanitation management to meet healthy house standards
NASA Astrophysics Data System (ADS)
Studyanto, Anung B.; Musfiroh, Mujahidatul; Sholahuddin
2018-03-01
To increase the community participation in the toilet sanitation management at house to making a house according the healthy house standart. The toilet sanitation management is becoming complex with increasing population growth, and limited land for sanitation. The community participation determines the success of the toilet sanitation management and improving the health status of the community. This study used an observation method for the availability of latrines according the healthy house criteria, spatial layout and pit layout that meet health and safety standards. Spatial and layout include bathroom area, type of material used for wall and floor bathroom, type of latrine, distance the waste storage distance with water source, and sewerage. The respondents in this study are the people who live in Jaten Village taken by accidental sampling. The number of respondents in this study were 15 respondents.This study shows that all respondents (100%) already have toilet and 8 respondents (53%) have a good toilet sanitation management. Respondents have provided latrines as an effort to manage household waste and according the healthy house standart. The latrine spatial plan has been well implemented, but the latrine layout plan has not been properly.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frenkel, G.; Paterson, T.S.; Smith, M.E.
The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less
Greening MSW management systems by saving footprint: The contribution of the waste transportation.
Peri, G; Ferrante, P; La Gennusa, M; Pianello, C; Rizzo, G
2018-08-01
Municipal solid waste (MSW) management constitutes a highly challenging issue to cope with in order of moving towards more sustainable urban policies. Despite new Standards call for recycling and reusing materials contained in the urban waste, several municipalities still use landfilling as a waste disposal method. Other than the environmental pressure exerted by these plants, waste transportation from the collection points to the landfill needs a specific attention to correctly assess the whole burden of the waste management systems. In this paper, the Ecological Footprint (EF) indicator is applied to the actual MSW of the city of Palermo (Sicily). Results show that the effects produced by the involved transportation vehicles are not negligible, compared to those generated by the other segments of the waste management system. This issue is further deepened by analysing the role of transportation in an upgraded waste management system that is represented by the newly designed waste management plan of Palermo. The computed saved ecological footprint is used here for suitably comparing the environmental performances of the MSW system in both scenarios. Finally, the suitability of the EF method to address not only complete waste management plans but also single segments of the waste management system, is also discussed. Copyright © 2018 Elsevier Ltd. All rights reserved.
Sustainable waste management through end-of-waste criteria development.
Zorpas, Antonis A
2016-04-01
The Waste Framework Directive 2000/98 (WFD) contains specific requirements to define end-of-waste criteria (EWC). The main goal of EWC is to remove and eliminate the administrative loads of waste legislation for safe and high-quality waste materials, thereby facilitating and assisting recycling. The target is to produce effective with high quality of recyclables materials, promoting product standardization and quality and safety assurance, and improving harmonization and legal certainty in the recyclable material markets. At the same time, those objectives aim to develop a plan in order to improve the development and wider use of environmental technologies, which reduce pressure on environment and at the same time address the three dimensions of the Lisbon strategy: growth, jobs and environment. This paper presents the importance of EWC, and the approach of setting EWC as EWC affect several management systems as well as sustainable and clean technologies.
Shifting to Medicaid-Managed Long-Term Care: Are Vulnerable Florida Beneficiaries Properly Informed?
Peterson, Lindsay J; Hyer, Kathryn
2016-10-01
To examine and assess the adequacy of informational material provided to Florida long-term care beneficiaries being required to choose a managed care provider as part of a statewide, mandatory shift to Medicaid-managed long-term care (MMLTC). Informational materials provided by the state of Florida to 90,000 Medicaid long-term care beneficiaries via print mailings and a state website were examined using established content, usability, and readability criteria. Overall, the presentation minimized cognitive complexity, but the information was lacking in critical areas, such as providing clear explanations of the change taking place and the significance of beneficiaries' choices, and enabling beneficiaries to assess their own needs and preferences. A key feature of managed care is the users' choice of plans, but amid a significant policy shift toward MMLTC in Florida, vulnerable beneficiaries may not be receiving the information necessary to make choices that best meet their needs. Our analysis offers lessons to other states shifting to MMLTC. © The Author(s) 2015.
NASA Astrophysics Data System (ADS)
The effective integration of processes, systems, and procedures used in the production of aerospace systems using computer technology is managed by the Integration Technology Division (MTI). Under its auspices are the Information Management Branch, which is actively involved with information management, information sciences and integration, and the Implementation Branch, whose technology areas include computer integrated manufacturing, engineering design, operations research, and material handling and assembly. The Integration Technology Division combines design, manufacturing, and supportability functions within the same organization. The Processing and Fabrication Division manages programs to improve structural and nonstructural materials processing and fabrication. Within this division, the Metals Branch directs the manufacturing methods program for metals and metal matrix composites processing and fabrication. The Nonmetals Branch directs the manufacturing methods programs, which include all manufacturing processes for producing and utilizing propellants, plastics, resins, fibers, composites, fluid elastomers, ceramics, glasses, and coatings. The objective of the Industrial Base Analysis Division is to act as focal point for the USAF industrial base program for productivity, responsiveness, and preparedness planning.
MyLabStocks: a web-application to manage molecular biology materials
Chuffart, Florent; Yvert, Gaël
2014-01-01
Laboratory stocks are the hardware of research. They must be stored and managed with mimimum loss of material and information. Plasmids, oligonucleotides and strains are regularly exchanged between collaborators within and between laboratories. Managing and sharing information about every item is crucial for retrieval of reagents, for planning experiments and for reproducing past experimental results. We have developed a web-based application to manage stocks commonly used in a molecular biology laboratory. Its functionalities include user-defined privileges, visualization of plasmid maps directly from their sequence and the capacity to search items from fields of annotation or directly from a query sequence using BLAST. It is designed to handle records of plasmids, oligonucleotides, yeast strains, antibodies, pipettes and notebooks. Based on PHP/MySQL, it can easily be extended to handle other types of stocks and it can be installed on any server architecture. MyLabStocks is freely available from: https://forge.cbp.ens-lyon.fr/redmine/projects/mylabstocks under an open source licence. PMID:24643870
Proceedings: Conference on asbestos control and replacement for electric utilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
An EPRI conference on Asbestos Control and Replacement for Electric Utilities was held April 6--7, 1993 in conjunction with the Environmental Information Association`s (formerly National Asbestos Council) Environmental Management `93 Conference and Exposition. The high cost and potential liabilities of asbestos removal projects, compounded by concerns over the health effects of asbestos replacement materials, was the main motivation for the conference. The objective of the conference was to assemble guidance and information that will help utilities manage asbestos and to effectively prioritize EPRI research in this area. Eleven papers covered such topics as changes in the Environmental Protection Agency`s (EPA)more » ban on asbestos, utility experience with asbestos management and abatement, asbestos monitoring and disposal, and asbestos replacement materials. Utility feedback received at the conference indicates that present and planned EPRI research activities in this area will effectively meet industry needs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
2013-06-03
The US has a non-proliferation policy to receive foreign and domestic research reactor returns of spent fuel materials of US origin. These spent fuel materials are returned to the Department of Energy (DOE) and placed in storage in the L-area spent fuel basin at the Savannah River Site (SRS). The foreign research reactor returns fall subject to the 123 agreements for peaceful cooperation. These “123 agreements” are named after section 123 of the Atomic Energy Act of 1954 and govern the conditions of nuclear cooperation with foreign partners. The SRS management of these foreign obligations while planning material disposition pathsmore » can be a challenge.« less
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
Bazeyo, W; Mayega, R W; Orach, G C; Kiguli, J; Mamuya, S; Tabu, J S; Sena, L; Rugigana, E; Mapatano, M; Lewy, D; Mock, N; Burnham, G; Keim, M; Killewo, J
2013-06-01
The Eastern Africa region is regularly affected by a variety of disasters ranging from drought, to human conflict and population displacement. The magnitude of emergencies and response capacities is similar across the region. In order to strengthen public health disaster management capacities at the operational level in six countries of the Eastern Africa region, the USAID-funded leadership project worked through the HEALTH Alliance, a network of seven schools of public health from six countries in the region to train district-level teams. To develop a sustainable regional approach to building operational level capacity for disaster planning. This project was implemented through a higher education leadership initiative. Project activities were spear-headed by a network of Deans and Directors of public health schools within local universities in the Eastern Africa region. The leadership team envisioned a district-oriented systems change strategy. Pre-service and in-service curricula were developed regionally and district teams were formed to attend short training courses. Project activities began with a situational analysis of the disaster management capacity at national and operational levels. The next steps were chronologically the formation of country training teams and training of trainers, the development of a regional disaster management training curriculum and training materials, the cascading of training activities in the region, and the incorporation of emerging issues into the training curriculum. An evaluation model included the analysis of preparedness impact of the training program. The output from the district teams was the creation of individual district-level disaster plans and their implementation. This 4-year project focused on building operational level public health emergency response capacity, which had not previously been part of any national program. Use of the all-hazard approach rather than a scenario-based contingency planning led to the development of a standardized curriculum for training both in-service and pre-service personnel. Materials developed during the implementation phases of the project have been incorporated into public health graduate curricula in the seven schools. This systems-based strategy resulted in demonstrable outcomes related to district preparedness and university engagement in disaster management. University partnerships are an effective method to build district-level disaster planning capacity. Use of a regional network created a standardized approach across six countries.
ERIC Educational Resources Information Center
Wilson, Judy Lacy
This practicum met its goals of increasing enrollment in an inner city high school vocational home economics course on child guidance, care, and management services; increasing students' and counselors' knowledge about the course; and providing audiovisual and printed materials to help students make an informed selection of the course. The…
ERIC Educational Resources Information Center
Stewart, Bob R.; And Others
This instructor's guide contains eight lesson plans for teaching soil conservation in accordance with the Missouri State Board of Education's Vocational Instructional Management System. To make the unit easier for teachers to use, the following materials are provided in the front of the unit: objectives and competencies for each lesson, a…
Time Management: A Lesson Plan, Transparencies, Handouts and Media Evaluations on the Topic.
ERIC Educational Resources Information Center
Campbell, Clifton P.
Intended for use in a 3-hour instructional program at the graduate level, the packet contains an outline of the instructional content, 9 transparencies, 12 handouts, and 7 supplementary materials. The outline is organized in terms of content, instructor activity (such as showing a transparency), and student activity. Instruction covers the…
30 CFR 75.370 - Mine ventilation plan; submission and approval.
Code of Federal Regulations, 2010 CFR
2010-07-01
... copy to the representative of miners at the time of notification. In the event of a situation requiring... district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the...
Planning the future's forests with assisted migration [Chapter 8
Mary I. Williams; R. Kasten Dumroese
2016-01-01
If the climate changes faster than the adaptation or migration capability of plants (Zhu et al. 2012; Gray and Hamann 2013), foresters and other land managers will face an overwhelming challenge. Growing trees that survive may become more important than growing perfectly formed trees (Hebda 2008) and may require selection of adapted plant materials and/or assisting the...
A model to minimize joint total costs for industrial waste producers and waste management companies.
Tietze-Stöckinger, Ingela; Fichtner, Wolf; Rentz, Otto
2004-12-01
The model LINKopt is a mixed-integer, linear programming model for mid- and long-term planning of waste management options on an inter-company level. There has been a large increase in the transportation of waste material in Germany, which has been attributed to the implementation of the European Directive 75/442/EEC on waste. Similar situations are expected to emerge in other European countries. The model LINKopt has been developed to determine a waste management system with minimal decision-relevant costs considering transportation, handling, storage and treatment of waste materials. The model can serve as a tool to evaluate various waste management strategies and to obtain the optimal combination of investment options. In addition to costs, ecological aspects are considered by determining the total mileage associated with the waste management system. The model has been applied to a German case study evaluating different investment options for a co-operation between Daimler-Chrysler AG at Rastatt, its suppliers, and the waste management company SITA P+R GmbH. The results show that the installation of waste management facilities at the premises of the waste producer would lead to significant reductions in costs and transportation.
Monitoring and Testing the Parts Cleaning Stations, Abrasive Blasting Cabinets, and Paint Booths
NASA Technical Reports Server (NTRS)
Jordan, Tracee M.
2004-01-01
I have the opportunity to work in the Environmental Management Office (EMO) this summer. One of the EMO's tasks is to make sure the Environmental Management System is implemented to the entire Glenn Research Center (GRC). The Environmental Management System (EMS) is a policy or plan that is oriented toward minimizing an organization's impact to the environment. Our EMS includes the reduction of solid waste regeneration and the reduction of hazardous material use, waste, and pollution. With the Waste Management Team's (WMT) help, the EMS can be implemented throughout the NASA Glenn Research Center. The WMT is responsible for the disposal and managing of waste throughout the GRC. They are also responsible for the management of all chemical waste in the facility. My responsibility is to support the waste management team by performing an inventory on parts cleaning stations, abrasive cabinets, and paint booths through out the entire facility. These booths/stations are used throughout the center and they need to be monitored and tested for hazardous waste and material. My job is to visit each of these booths/stations, take samples of the waste, and analyze the samples.
Vermandere, Heleen; Galle, Anna; Griffin, Sally; de Melo, Málica; Machaieie, Lino; Van Braeckel, Dirk; Degomme, Olivier
2017-05-02
Good progress is being made towards universal access to contraceptives, however stock-outs still jeopardize progress. A seldom considered but important building block in optimizing supply management is the degree to which health workers feel motivated and responsible for monitoring supply. We explored how and to what extent motivation can be improved, and the impact this can have on avoiding stock-outs. Fifteen health facilities in Maputo Province, Mozambique, were divided into 3 groups (2 intervention groups and 1 control), and 10 monthly audits were implemented in each of these 15 facilities to collect data through examination of stock cards and stock-counts of 6 contraceptives. Based on these audits, the 2 intervention groups received a monthly evaluation report reflecting the quality of their supply management. One of these 2 groups was also awarded material incentives conditional on their performance. A Wilcoxon-Mann Whitney test was used to detect differences between the groups in the average number of stocked-out centres, while changes over time were verified through applying a Friedman test. Additionally, staff motivation was measured through interviewing health care providers of all centres at baseline, and after 5 and 10 months. To detect differences between the groups and changes over time, a Kruskal Wallis and a Wilcoxon signed-rank test were applied, respectively. Motivation reported by providers (n = 55, n = 40 and n = 39 at baseline, 1st and 2nd follow-up respectively) was high in all groups, during all rounds, and did not change over time. Facilities in the intervention groups had better supply management results (including less stock-outs) during the entire intervention period compared with those in the control group, but the difference was only significant for the group receiving both material incentives and a monthly evaluation. However, our data also suggest that supply management also improved in control facilities, receiving only a monthly audit. During this study, more stock-outs occurred for family planning methods with lower demand, but the number of stock-outs per family planning method in the intervention groups was only significantly lower, compared with the control group, for female condoms. While a rise in motivation was not measurable, stock management was enhanced possibly as a result of the monthly audits. This activity was primarily for data collection, but was described as motivating and supportive, indicating the importance of feedback on health workers' accomplishments. More research is needed to quantify the additional impact of the interventions (distribution of evaluation reports and material incentives) on staff motivation and supply management. Special attention should be paid to supply management of less frequently used contraceptive methods.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenly, G.D. Jr.
1986-03-01
The risk assessment lesson learned from the Bhopal tragedy is both simple and complex. Practical planning for toxic material releases must start with an understanding of what the risks and possible consequences are. Additionally, plans must be formulated to ensure immediate decisive actions tailored to site specific scenarios, and the possible impacts projected on both the plant and surrounding communities. Most importantly, the planning process must include the communities that could be affected. Such planning will ultimately provide significant financial savings and provide for good public relations, and this makes good business sense in both developed and developing countries. Paraphrasingmore » the adage ''a penny saved is a penny earned,'' a penny spent on emergency preparedness is dollars earned through public awareness. The complex aspect of these simple concepts is overcoming human inertia, i.e., overcoming the ''it can't happen here'' syndrome in both government and private industry. A world center of excellence (ITRAC), acting as a center for education, research, and development in the area of emergency planning and response, will be the conduit for needed technology transfer to national centers of excellence in emergency planning and response. These national emergency planning and response centers (NARACS), managed by private industry for governments, will be catalysts to action in formulating effective plans involving potentially affected communities and plant management. The ITRAC/NARAC proposal is a simple concept involving complex ideas to solve the simple problem of being prepared for the Bhopal-like emergency which, as experience has demonstrated, will have complex consequences for the unprepared.« less
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2012 CFR
2012-07-01
... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...
76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, technicians help lift the first of the Materials International Space Station Experiments, or MISSE, from a shipping container. The MISSE is part of the payload onboard space shuttle Endeavour for mission STS-123. It will be installed in Endeavour's payload bay. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, technicians get ready to remove another Materials International Space Station Experiments, or MISSE, from a shipping container. The MISSE is part of the payload onboard space shuttle Endeavour for mission STS-123. It will be installed in Endeavour's payload bay. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, technicians get ready to remove one of two Materials International Space Station Experiments, or MISSE, from a shipping container. The MISSE is part of the payload onboard space shuttle Endeavour for mission STS-123. It will be installed in Endeavour's payload bay. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
2007-11-14
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, one of two Materials International Space Station Experiments, or MISSE, is moved across facility toward space shuttle Endeavour. The MISSE is part of the payload onboard Endeavour for mission STS-123 and will be installed in the payload bay. The MISSE project is a NASA/Langley Research Center-managed cooperative endeavor to fly materials and other types of space exposure experiments on the International Space Station. The objective is to develop early, low-cost, non-intrusive opportunities to conduct critical space exposure tests of space materials and components planned for use on future spacecraft. Photo credit: NASA/Kim Shiflett
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
Bianchini, A; Pellegrini, M; Saccani, C
2011-01-01
This paper analyses the way numerical data on Municipal Solid Waste (MSW) quantities are recorded, processed and then reported for six of the most meaningful Italian Districts and shows the difficulties found during the comparison of these Districts, starting from the lack of homogeneity and the fragmentation of the data indispensable to make this critical analysis. These aspects are often ignored, but data certainty are the basis for serious MSW planning. In particular, the paper focuses on overall Source Separation Level (SSL) definition and on the influence that Special Waste (SW) assimilated to MSW has on it. An investigation was then necessary to identify new parameters in place of overall SSL. Moreover, these parameters are not only important for a waste management system performance measure, but are fundamental in order to design and check management plan and to identify possible actions to improve it. Copyright © 2011 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bianchini, A.; Pellegrini, M.; Saccani, C., E-mail: cesare.saccani@unibo.it
2011-09-15
This paper analyses the way numerical data on Municipal Solid Waste (MSW) quantities are recorded, processed and then reported for six of the most meaningful Italian Districts and shows the difficulties found during the comparison of these Districts, starting from the lack of homogeneity and the fragmentation of the data indispensable to make this critical analysis. These aspects are often ignored, but data certainty are the basis for serious MSW planning. In particular, the paper focuses on overall Source Separation Level (SSL) definition and on the influence that Special Waste (SW) assimilated to MSW has on it. An investigation wasmore » then necessary to identify new parameters in place of overall SSL. Moreover, these parameters are not only important for a waste management system performance measure, but are fundamental in order to design and check management plan and to identify possible actions to improve it.« less
Efficiency improvements of offline metrology job creation
NASA Astrophysics Data System (ADS)
Zuniga, Victor J.; Carlson, Alan; Podlesny, John C.; Knutrud, Paul C.
1999-06-01
Progress of the first lot of a new design through the production line is watched very closely. All performance metrics, cycle-time, in-line measurement results and final electrical performance are critical. Rapid movement of this lot through the line has serious time-to-market implications. Having this material waiting at a metrology operation for an engineer to create a measurement job plan wastes valuable turnaround time. Further, efficient use of a metrology system is compromised by the time required to create and maintain these measurement job plans. Thus, having a method to develop metrology job plans prior to the actual running of the material through the manufacture area can significantly improve both cycle time and overall equipment efficiency. Motorola and Schlumberger have worked together to develop and test such a system. The Remote Job Generator (RJG) created job plans for new device sin a manufacturing process from an NT host or workstation, offline. This increases available system tim effort making production measurements, decreases turnaround time on job plan creation and editing, and improves consistency across job plans. Most importantly this allows job plans for new devices to be available before the first wafers of the device arrive at the tool for measurement. The software also includes a database manager which allows updates of existing job plans to incorporate measurement changes required by process changes or measurement optimization. This paper will review the result of productivity enhancements through the increased metrology utilization and decreased cycle time associated with the use of RJG. Finally, improvements in process control through better control of Job Plans across different devices and layers will be discussed.
PUREX/UO{sub 3} deactivation project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Washenfelder, D.J.
1993-12-01
From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retainedmore » during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.« less
Modelling raw water quality: development of a drinking water management tool.
Kübeck, Ch; van Berk, W; Bergmann, A
2009-01-01
Ensuring future drinking water supply requires a tough management of groundwater resources. However, recent practices of economic resource control often does not involve aspects of the hydrogeochemical and geohydraulical groundwater system. In respect of analysing the available quantity and quality of future raw water, an effective resource management requires a full understanding of the hydrogeochemical and geohydraulical processes within the aquifer. For example, the knowledge of raw water quality development within the time helps to work out strategies of water treatment as well as planning finance resources. On the other hand, the effectiveness of planed measurements reducing the infiltration of harmful substances such as nitrate can be checked and optimized by using hydrogeochemical modelling. Thus, within the framework of the InnoNet program funded by Federal Ministry of Economics and Technology, a network of research institutes and water suppliers work in close cooperation developing a planning and management tool particularly oriented on water management problems. The tool involves an innovative material flux model that calculates the hydrogeochemical processes under consideration of the dynamics in agricultural land use. The program integrated graphical data evaluation is aligned on the needs of water suppliers.
Fernandez, M E; Bartholomew, L K; Alterman, T
2009-01-01
Noise-induced hearing loss (NIHL) is the second most prevalent self-reported occupational illness or injury in the U.S., and agricultural workers experience high rates of hearing loss. This article uses Intervention Mapping (IM), a systematic approach to intervention development, to make recommendations for a program to improve hearing loss protection among farmworkers and managers. Final recommendations, based on previous work in the literature on hearing loss prevention, qualitative formative research, and theoretical considerations, include a specification of a multilevel theory- and evidence-based hearing protection program for farmworkers and farm managers. Twelve performance objectives (e.g., "monitor hearing and hearing loss with regular hearing testing") are specified and crossed with six relevant determinants (knowledge and behavioral capability; perceived exposure and susceptibility and noise annoyance; outcome expectations; barriers; social influence; skills and self-efficacy) to create a highly detailed matrix of change objectives for farmworkers and for their managers. These change objectives are then grouped into five categories: two for both farmworkers and their managers (noticing exposures, taking action) and three only for the latter (surveying and planning, implementation and evaluation, and communication). Theoretical methods and practical strategies, including program materials and activities, are then delineated.
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
Education Program for Ph.D. Course to Cultivate Literacy and Competency
NASA Astrophysics Data System (ADS)
Yokono, Yasuyuki; Mitsuishi, Mamoru
The program aims to cultivate internationally competitive young researchers equipped with Fundamental attainment (mathematics, physics, chemistry and biology, and fundamental social sciences) , Specialized knowledge (mechanical dynamics, mechanics of materials, hydrodynamics, thermodynamics, design engineering, manufacturing engineering and material engineering, and bird‧s-eye view knowledge on technology, society and the environment) , Literacy (Language, information literacy, technological literacy and knowledge of the law) and Competency (Creativity, problem identification and solution, planning and execution, self-management, teamwork, leadership, sense of responsibility and sense of duty) to become future leaders in industry and academia.
How to HAMMER home hazardous materials training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ollero, J.
1994-10-01
This article describes HAMMER - the Hazardous Materials Management and Emergency Response Training - program being developed at the Hanford Reservation. The program uses true-to-life props and facilities to simulate emergencies and hazardous conditions. Topics covered include the set-up of the facility and training; the demand for such training; the involvement of the Army Corps of Engineers; the props to be constructed; the educational involvement of Tulane and Xavier Univerisities of Louisiana; temporary facility for the program; partnership with Indian Nations and Stakeholders; and budget plans and constriction. 9 figs.
NASA Astrophysics Data System (ADS)
Song, Young Joo; Woo, Jong Hun; Shin, Jong Gye
2009-12-01
Today, many middle-sized shipbuilding companies in Korea are experiencing strong competition from shipbuilding companies in other nations. This competition is particularly affecting small- and middle-sized shipyards, rather than the major shipyards that have their own support systems and development capabilities. The acquisition of techniques that would enable maximization of production efficiency and minimization of the gap between planning and execution would increase the competitiveness of small- and middle-sized Korean shipyards. In this paper, research on a simulation-based support system for ship production management, which can be applied to the shipbuilding processes of middle-sized shipbuilding companies, is presented. The simulation research includes layout optimization, load balancing, work stage operation planning, block logistics, and integrated material management. Each item is integrated into a network system with a value chain that includes all shipbuilding processes.
Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P
2013-01-01
Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: <0.4), (3) action plan characteristics (peak flow vs symptom-based, symptoms, recommended actions). Mean (SD) overall readability grade level was 7.2 (1.1) (range = 5.7-9.8); 70.0% were above a sixth-grade level. Mean (SD) suitability score was 0.74 (0.14). Overall, all action plans were found to be adequate, although 40.0% had an unsuitable score in at least 1 factor. The highest percent of unsuitable scores were found in the categories of layout/typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.
Optimism in Enrollment Management
ERIC Educational Resources Information Center
Buster-Williams, Kimberley
2016-01-01
Enrollment managers, like most managers, have goals that must be focused on with precision, excitement, and vigor. Enrollment managers must excel at enrollment planning. Typically, enrollment planning unites undergraduate and graduate recruitment plans, out-of-state recruitment plans, marketing plans, retention plans, international enrollment…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pool, Karl N.; Minette, Michael J.; Wahl, Jon H.
On September 28, 2015, debris collected from the PRF (236-Z) canyon floor, Pan J, was observed to exhibit chemical reaction. The material had been transferred from the floor pan to a collection tray inside the canyon the previous Friday. Work in the canyon was stopped to allow Industrial Hygiene to perform monitoring of the material reaction. Canyon floor debris that had been sealed out was sequestered at the facility, a recovery plan was developed, and drum inspections were initiated to verify no additional reactions had occurred. On October 13, in-process drums containing other Pan J material were inspected and showedmore » some indication of chemical reaction, limited to discoloration and degradation of inner plastic bags. All Pan J material was sealed back into the canyon and returned to collection trays. Based on the high airborne levels in the canyon during physical debris removal, ETGS (Encapsulation Technology Glycerin Solution) was used as a fogging/lock-down agent. On October 15, subject matter experts confirmed a reaction had occurred between nitrates (both Plutonium Nitrate and Aluminum Nitrate Nonahydrate (ANN) are present) in the Pan J material and the ETGS fixative used to lower airborne radioactivity levels during debris removal. Management stopped the use of fogging/lock-down agents containing glycerin on bulk materials, declared a Management Concern, and initiated the Potential Inadequacy in the Safety Analysis determination process. Additional drum inspections and laboratory analysis of both reacted and unreacted material are planned. This report compiles the results of many different sample analyses conducted by the Pacific Northwest National Laboratory on samples collected from the Plutonium Reclamation Facility (PRF) floor pans by the CH2MHill’s Plateau Remediation Company (CHPRC). Revision 1 added Appendix G that reports the results of the Gas Generation Rate and methodology. The scope of analyses requested by CHPRC includes the determination of common anions, gamma spectrometry, metals, corrosivity, organics and alpha spectrometry (note: alpha spectrometry was cancelled during the performance of this work with concurrence from CHPRC). Results may help elucidate the components that led to the unexpected reaction in the canyon as well as inform the radiological and hazardous characteristics. The specific anions, gamma emitters, organics and metals requested by CHPRC are provided in the analytical reports sections. The individual analyses were conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.) developed by PNNL specifically for this project. The final reports for each analysis set are included in this compilation of the results. Each package was reviewed under the PFP Floor Pan Evaluation Project Quality Assurance Project Plan so no additional reviews were conducted in this compilation task. The Gas Generation Rates in Appendix G were conducted under the PNNL “How Do I…” quality assurance program and were NOT conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.).« less
Hines, Walter G.
1973-01-01
The San Francisco Bay region has suffered adverse environmental effects related to the discharge of municipal-, industrial-, and agricultural- wastewater and storm-water runoff. Specific pollutional properties of theses discharges are not well understood in all cases although the toxic materials and aquatic-plant nutrients (biostimulants) found in municipal and industrial waterwater are considered to be a major cause of regional water-quality problems. Other water-quality problems in the region are commonly attributed to pesticides found in agricultural wastewater and potentially pathogenic bacteria in municipal-wastewater discharges and in storm-water runoff. The geographical distribution and magnitude of wastewater discharges in the bay region, particularly those from municipalities and industries, is largely a function of population, economic growth, and urban development. As might be expected, the total volume of wastewater has increased in a trend paralleling this growth and development. More significant, perhaps, is the fact that the total volume parameters such as BOD (biochemical oxygen demand), biostimulant concentrations, and toxicity, has increased despite large expenditures on new and improved municipal- and industrial-wastewater-treatment plants. Also, pollutant loadings from other major source, such as agriculture and storm-water runoff, have increased. At the time of writing (1972), many Federal, State, regional, and local agencies are engaged in a comprehensive wastewater-management-planning effort for the entire bay region. Initial objectives of this planning effort are: (1) the consolidation and coordination of loosely integrated wastewater-management facilities and (2) the elimination of wastewater discharges to ecologically sensitive areas, such as fresh-water streams and shallow extremities of San Francisco Bay. There has been some investigation of potential long-range wastewater-management alternatives based upon disposal in deep water in the bay, in the Pacific Ocean, or on land. Also, wastewater-reclamation and water-reuse concepts seem to be growing in favor with the public and should become and important part of future wastewater-management plans. Because most wastewater-reclamation and water-reuse systems would involve the use of land (that is agricultural irrigation, ground-water recharge, recreational reservoirs) local and regional lang-use planners can ass much to wastewater-management planning by identifying local and subregional waterwater-reclamation and water-reuse possibilities within their jurisdictions and integrating them with future land-use plans. The timely participation of planner is essential because Federal and State planning and funding deadlines for a regional wastewater-management system become effective in July 1973 and 1974, respectively.
LAND-MAN: a new curriculum based on open distance learning for Asian
NASA Astrophysics Data System (ADS)
Guadagno, F. M.; Dhital, M. R.; Petley, D.
2003-04-01
Land-Man is a one-year Asian-European partnership project (Asia-Link EU programme), aiming to implement both a new curriculum and a new distance learning model in the field of landslides management which deals with situations that occur prior to, during, and after the landslide. The emphasis in Land-Man is placed on establishing methodologies, guidelines, and tools to develop Open and Distance Learning (ODL) for the future improvement and harmonisation of education in Landslides Management. Decision-makers, postgraduate students in environmental, earth and engineering disciplines, as well as professionals may benefit from the project. During the implementation of activities, the clear intention is to use internet-based tools in order to strengthen the co-operation between partners and thus lay a stable, cross-cultural, internet-oriented foundation for the future ODL-based educational model. At the end of the project, an ODL-based model for Asian-European Landslides Management Education will be designed and based on specially assembled, multimedia products. In particular, the project aims to provide tutors/professors with training by supplying them with appropriate materials and support to enable them to change to the new teaching model and by focusing on assessment of training, self-esteem, comfort level, commitment, and enthusiasm for tutors. The project also aims to nurture positive attitudes towards distance learning by changing the techniques whereby students learn landslides management, using the latest educational strategies and technology. Although the management of territory is the responsibility of national and local authorities, personnel in these departments can have limited training and experience in natural hazard and, particularly, in landslides management plans. This project will not only hypothesise, through a new curriculum, how management planning can be undertaken, but will also consider how to bring together practitioners and decision makers from different disciplines to work together and benefit from each other's skill and experience to achieve a truly integrated plan. An integrated landslides management plan, once operational has numerous benefits for a wide number of professionals working on areas at risk. It establishes how to reduce or avoid the human, physical, and economic losses suffered by individuals, by society, and by the country. Through an established web site (www.land-man.net) the project aims to create a self-sustaining virtual community open to academics, professionals and decision makers, thus reaching and benefiting a wide multidisciplinary user group. Firstly, academics attending the curricula and the training courses will be in a position to pass on the knowledge and experience gained to their students. The training course is specifically designed for this purpose and part of the output for the activity will be documentation that can be used by participants for future teaching purposes. Professors will benefit from the material produced (CD-ROM, web pages, etc.) in their teaching activity. Through exchanges they will have an opportunity to meet other teachers and to develop their knowledge base of landslides management and teaching methods. Students will benefit directly from educational material produced and directed specifically to their learning levels. The local and national media will also be benefiting as project outcomes such as animation and clips are made available to them. This will also be a valuable means of drawing the attention of a wide audience to natural hazards.
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
ERIC Educational Resources Information Center
Pivarnik, Lori F.; Patnoad, Martha S.; Nyachuba, David; McLandsborough, Lynne; Couto, Stephen; Hagan, Elsina E.; Breau, Marti
2013-01-01
Food safety training materials, targeted for residential childcare institution (RCCI) staff of facilities of 20 residents or less, were developed, piloted, and evaluated. The goal was to assist in the implementation of a Hazard Analysis Critical Control Points (HACCP)-based food safety plan as required by Food and Nutrition Service/United States…
ERIC Educational Resources Information Center
Kaya, Fatih; Delen, Erhan; Ritter, Nicola L.
2012-01-01
This article presents a review of the Children's Organizational Skills Scales (COSS) which were designed to assess how children organize their time, materials, and actions to accomplish important tasks at home and school. The scale quantifies children's skills in organization, time management, and planning (OTMP). The COSS is a multi-informant…
ERIC Educational Resources Information Center
Asian Development Bank, Manila (Philippines).
These proceedings are divided into three parts. The first part provides a general summary of the discussions under the headings of scope of distance education and nonformal, formal, and continuing education; cost-effectiveness; technology; instructional materials; recognition and status; planning and management; training; international…
ERIC Educational Resources Information Center
Shultz, Gwendolyn Joy; Havens, Nathan; Gurney, Beth Newberry; Burt, Jon
2017-01-01
Managing problematic classroom behavior is a challenge for many teachers, regardless of population. The website, www.basicfba.com, designed by researchers at Portland State University, offers teachers and practitioners a wealth of materials to assist them in conducting and maintaining a functional behavior assessment and behavior support plan.…
25 CFR 163.11 - Forest management planning and sustained yield management.
Code of Federal Regulations, 2010 CFR
2010-04-01
... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.
1993-12-01
The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S&H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactivemore » materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures.« less
42 CFR 457.150 - CMS review of State plan material.
Code of Federal Regulations, 2013 CFR
2013-10-01
... State plan material. (a) Basis for action. CMS reviews each State plan and plan amendment to determine... on complete plan. CMS approves or disapproves the State plan or plan amendment only in its entirety... disapprove the State plan or plan amendment, or to determine that previously approved material no longer...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
25 CFR 163.11 - Forest management planning and sustained yield management.
Code of Federal Regulations, 2011 CFR
2011-04-01
... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... 25 Indians 1 2011-04-01 2011-04-01 false Forest management planning and sustained yield management... management planning for Indian forest land shall be carried out through participation in the development and...
Environmental Management System Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Robert; Thorson, Patrick; Horst, Blair
2009-03-24
Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.« less
Operations system administration plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources,more » Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.« less
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for... Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
Summary of findings of the R&D committee
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kenley, C.R.; Kokenge, B.R.
1996-05-01
In March 1995, the Department of Energy`s (DOE) Nuclear Materials Stabilization Task Group (NMST) chartered a committee to formulate a research and development (R&D) plan in response to Sub-recommendation (2) of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The NMSTG was established as an organizational unit operating under the auspices of the DOE Office of the Environmental Management. As a result of its efforts, the Research Committee concluded that, in general, the technology needs for stabilizing 94-1 nuclear materials are being adequately met by existing or planned DOE programs. At the same time, the committee, in the form ofmore » recommendations, noted specific R&D program areas that should be addressed by the NMSTG. These recommendations are documented in the R&D plan and formulated based on: (1) existing {open_quotes}gaps{close_quotes} in DOE`s R&D stabilization program, (2) the relative maturity of various technologies, and (3) other important R&D program issues that, in the judgement of the committee, should be addressed by the NMSTG. A systems engineering approach, derived form the aerospace industry, was applied to the various stabilization technologies to assess their relative maturity and availability for use in treating 94-1 nuclear materials.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip
Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less
Principles of effective USA federal fire management plans
Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.
2015-01-01
Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.
Experiences of an Engineer working in Reactor Safety and Emergency Response
NASA Astrophysics Data System (ADS)
Osborn, Douglas
2015-04-01
The U.S. Department of Energy's Federal Radiological Monitoring and Assessment Center Consequence Management Home Team (FRMAC/CMHT) Assessment Scientist's roles, responsibilities incorporate the FRMAC with other federal, state, and local agencies during a nuclear/radiological emergency. Before the Consequence Management Response Team arrives on-site, the FRMAC/CMHT provides technical and logistical support to the FRMAC and to state, local, and tribal authorities following a nuclear/radiological event. The FRMAC/CMHT support includes analyzing event data, evaluating hazards that relate to protection of the public, and providing event information and data products to protective action decision makers. The Assessment Scientist is the primary scientist responsible for performing calculations and analyses and communicating results to the field during any activation of the FRMAC/CMHT assets. As such, the FRMAC/CMHT Assessment Scientist has a number of different roles and responsibilities to fill depending upon the type of response that is required. Additionally, the Sandia National Laboratories (SNL) Consequence Assessment Team (CAT) Consequence Assessor roles, responsibilities involve hazardous materials operational emergency at SNL New Mexico facilities (SNL/NM) which include loss of control over radioactive, chemical, or explosive hazardous materials. When a hazardous materials operational emergency occurs, key decisions must be made in order to regain control over the hazards, protect personnel from the effects of the hazards, and mitigate impacts on operations, facilities, property, and the environment. Many of these decisions depend in whole or in part on the evaluation of potential consequences from a loss of control over the hazards. As such, the CAT has a number of different roles and responsibilities to fill depending upon the type of response that is required. Primary consequence-based decisions supported by the CAT during a hazardous materials operational emergency at SNL/NM include: (1) Onsite Protective Actions (2) Offsite Protective Action Recommendations (3) Event categorization (4) Event classification Other consequence-based decisions supported by the CAT include: (1) Response planning and operations (2) Event termination (3) Reentry planning and operations (4) Recovery planning and operations Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration.
25 CFR 166.312 - Is a conservation plan required?
Code of Federal Regulations, 2010 CFR
2010-04-01
... Operations Management Management Plans and Environmental Compliance § 166.312 Is a conservation plan required... resource management plan and must address the permittee's management objectives regarding animal husbandry...
DOE Office of Scientific and Technical Information (OSTI.GOV)
M. Keister; K, McBride
The Nuclear Waste Policy Act of 1982 (NWPA), as amended, assigned the Department of Energy (DOE) responsibility for developing and managing a Federal system for the disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for accepting, transporting, and disposing of SNF and HLW at the Yucca Mountain repository (if licensed) in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. OCRWM faces a near-term challenge--to develop and demonstrate a transportation system that will sustain safe and efficientmore » shipments of SNF and HLW to a repository. To better inform and improve its current planning, OCRWM has extensively reviewed plans and other documents related to past high-visibility shipping campaigns of SNF and other radioactive materials within the United States. This report summarizes the results of this review and, where appropriate, lessons learned. The objective of this lessons learned study was to identify successful, best-in-class trends and commonalities from past shipping campaigns, which OCRWM could consider when planning for the development and operation of a repository transportation system. Note: this paper is for analytical and discussion purposes only, and is not an endorsement of, or commitment by, OCRWM to follow any of the comments or trends. If OCRWM elects to make such commitments at a future time, they will be appropriately documented in formal programmatic policy statements, plans and procedures. Reviewers examined an extensive study completed in 2003 by DOE's National Transportation Program (NTP), Office of Environmental Management (EM), as well as plans and documents related to SNF shipments since issuance of the NTP report. OCRWM examined specific planning, business, institutional and operating practices that have been identified by DOE, its transportation contractors, and stakeholders as important issues that arise repeatedly. In addition, the review identifies lessons learned or activities/actions which were found not to be productive to the planning and conduct of SNF shipments (i.e., negative impacts). This paper is a 'looking back' summary of lessons learned across multiple transportation campaigns. Not all lessons learned are captured here, and participants in some of the campaigns have divergent opinions and perspectives about which lessons are most critical. This analysis is part of a larger OCRWM benchmarking effort to identify best practices to consider in future transportation of radioactive materials ('looking forward'). Initial findings from this comprehensive benchmarking analysis are expected to be available in late fall 2006.« less
Emerging Technologies: Biosecurity and Consequence Management Implications
NASA Astrophysics Data System (ADS)
Perkins, Dana; Nordmann, Brian
The natural outbreaks of disease and pandemics are transnational threats that create international challenges when detection and containment are not timely due to scarce human and material resources. Whether the cause of those outbreaks is natural or intentional in origin, the main goal of consequence management operations is to save lives. The consequence management process is a continuum of inter-connected phases such as planning, preparation, response, and recovery. The rapid advances of life sciences and the emergence of dual-use technologies such as synthetic biology and nanotechnology pose additional challenges in terms of planning for the unknown potential threats whether they may be synthetic microorganisms with unpredictable dissemination patterns or nanoscale-manipulated biological agents evading current detection capabilities. The US National Strategy for Countering Biological Threats is emphasizing prevention while continuing to support the national preparedness goals and response/recovery capabilities. The recent policies, guidelines, and recommendations on overhauling the biological risk management in the United States are a proactive stance to a rapidly changing global environment. They include optimization of the current oversight frameworks and active engagement of the industry and academia in order to reduce the risk that individuals with ill intent may exploit the commercial application of nucleic acid synthesis technology to access genetic material derived from or by encoding Biological Select Agents or Toxins. We are also actively seeking to increase our knowledge of health effects of various types of nanomaterials, and how to assess, control, and prevent harmful exposure, taking into consideration the numerous gaps that currently exist with regard to the distinct behavior of nanoparticles compared to the same chemical or material at "macro-scale". Fundamentally, a biological incident, whether it is of natural, accidental, or deliberate origin, constitutes a public health problem and the United States is engaged with the international community to enhance our collective capability to address emerging health security threats.
MyLabStocks: a web-application to manage molecular biology materials.
Chuffart, Florent; Yvert, Gaël
2014-05-01
Laboratory stocks are the hardware of research. They must be stored and managed with mimimum loss of material and information. Plasmids, oligonucleotides and strains are regularly exchanged between collaborators within and between laboratories. Managing and sharing information about every item is crucial for retrieval of reagents, for planning experiments and for reproducing past experimental results. We have developed a web-based application to manage stocks commonly used in a molecular biology laboratory. Its functionalities include user-defined privileges, visualization of plasmid maps directly from their sequence and the capacity to search items from fields of annotation or directly from a query sequence using BLAST. It is designed to handle records of plasmids, oligonucleotides, yeast strains, antibodies, pipettes and notebooks. Based on PHP/MySQL, it can easily be extended to handle other types of stocks and it can be installed on any server architecture. MyLabStocks is freely available from: https://forge.cbp.ens-lyon.fr/redmine/projects/mylabstocks under an open source licence. © 2014 Laboratoire de Biologie Moleculaire de la Cellule CNRS. Yeast published by John Wiley & Sons, Ltd.
Materials in NASA's Space Launch System: The Stuff Dreams are Made of
NASA Technical Reports Server (NTRS)
May, Todd A.
2012-01-01
Mr. Todd May, Program Manager for NASA's Space Launch System, will showcase plans and progress the nation s new super-heavy-lift launch vehicle, which is on track for a first flight to launch an Orion Multi-Purpose Crew Vehicle around the Moon in 2017. Mr. May s keynote address will share NASA's vision for future human and scientific space exploration and how SLS will advance those plans. Using new, in-development, and existing assets from the Space Shuttle and other programs, SLS will provide safe, affordable, and sustainable space launch capabilities for exploration payloads starting at 70 metric tons (t) and evolving through 130 t for entirely new deep-space missions. Mr. May will also highlight the impact of material selection, development, and manufacturing as they contribute to reducing risk and cost while simultaneously supporting the nation s exploration goals.
Third Aerospace Environmental Technology Conference
NASA Technical Reports Server (NTRS)
Whitaker, A. F. (Editor); Cross, D. R. (Editor); Caruso, S. V. (Editor); Clark-Ingram, M. (Editor)
1999-01-01
The elimination of CFC's, Halons, TCA, other ozone depleting chemicals, and specific hazardous materials is well underway. The phaseout of these chemicals has mandated changes and new developments in aerospace materials and processes. We are beyond discovery and initiation of these new developments and are now in the implementation phase. This conference provided a forum for materials and processes engineers, scientists, and managers to describe, review, and critically assess the evolving replacement and clean propulsion technologies from the standpoint of their significance, application, impact on aerospace systems, and utilization by the research and development community. The use of these new technologies, their selection and qualification, their implementation, and the needs and plans for further developments are presented.
Materials Challenges in Space Exploration
NASA Technical Reports Server (NTRS)
Bhat, Biliyar N.
2005-01-01
United States civil space program administered by National Aeronautics and Space Administration has a new strategic direction to explore the solar system. This new 'vision for space exploration' encompasses a broad range of human and robotic missions, including the Moon. Mars and destinations beyond. These missions require advanced systems and capabilities that will accelerate the development of many critical technologies, including advanced materials and structural concepts. Specifically, it is planned to develop high-performance materials for vehicle structures, propulsion systems, and space suits; structural concepts for modular assembly for space infrastructure: lightweight deployable and inflatable structures for large space systems and crew habitats; and highly integrated structural systems and advanced thermal management systems for reducing launch mass and volume. This paper will present several materials challenges in advanced space systems-high performance structural and thermal materials, space durable materials, radiation protection materials, and nano-structural materials. Finally, the paper will take a look at the possibility of utilizing materials in situ, i.e., processing materials on the surface of the Moon and Mars.
Moyle, Phillip R.; Wallis, John C.; Bliss, James D.; Bolm, Karen D.
2004-01-01
The U.S. Geological Survey (USGS) compiled a database of aggregate sites and geotechnical sample data for six counties - Ada, Boise, Canyon, Elmore, Gem, and Owyhee - in southwest Idaho as part of a series of studies in support of the Bureau of Land Management (BLM) planning process. Emphasis is placed on sand and gravel sites in deposits of the Boise River, Snake River, and other fluvial systems and in Neogene lacustrine deposits. Data were collected primarily from unpublished Idaho Transportation Department (ITD) records and BLM site descriptions, published Army Corps of Engineers (ACE) records, and USGS sampling data. The results of this study provides important information needed by land-use planners and resource managers, particularly in the BLM, to anticipate and plan for demand and development of sand and gravel and other mineral material resources on public lands in response to the urban growth in southwestern Idaho.
The management of large cabling campaigns during the Long Shutdown 1 of LHC
NASA Astrophysics Data System (ADS)
Meroli, S.; Machado, S.; Formenti, F.; Frans, M.; Guillaume, J. C.; Ricci, D.
2014-03-01
The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most challenging activities concerns the cabling infrastructure (copper and optical fibre cables) serving the CERN data acquisition, networking and control systems. About 1000 kilometres of cables, distributed in different machine areas, will be installed, representing an investment of about 15 MCHF. This implies an extraordinary challenge in terms of project management, including resource and activity planning, work execution and quality control. The preparation phase of this project started well before its implementation, by defining technical solutions and setting financial plans for staff recruitment and material supply. Enhanced task coordination was further implemented by deploying selected competences to form a central support team.
Approaches to pharmacy benefit management and the impact of consumer cost sharing.
Olson, Bridget M
2003-01-01
Numerous mechanisms have been introduced to deliver prescription drug benefits while controlling pharmaceutical costs. An understanding of the most prominent mechanisms of benefit management is an important step in determining the most effective approach to take in future years. The aims of this review were to illustrate the mechanisms by which managed care has attempted to efficiently and equitably deliver pharmacy benefits and to discuss the impact of such programs, including consumer cost sharing. A review of the literature was conducted using the PreMedline and MEDLINE databases from the years 1966 to 2002, reference lists from relevant articles, and online sources, including news releases, conference materials, and pharmacy benefit management reports. Numerous pharmacy benefit management tools and their impact on utilization, expenditures, and health outcomes are reviewed, including disease state management; utilization management (ie, quantity limitations and prior authorization); drug utilization review; formulary management (ie, open and closed); delivery systems (ie, retail and mail order); and mechanisms for implementing consumer cost sharing (ie, generic incentives, multitiered copayments, and co-insurance). Although there is some evidence to suggest that certain benefit management tools have been successful in reducing health plan expenditures, a more thorough investigation of their potential unintended consequences is needed. Implementing adequate levels of consumer cost sharing is necessary if employers and health plans are to continue offering prescription drug benefits. It is important to remember, however, that quality health care cannot be forfeited for the sake of short-term cost savings.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Resources Management Plan/Environmental Impact Statement for Mojave National Preserve. SUMMARY: Pursuant to... preparing a Water Resources Management Plan/Environmental Impact Statement (WRMP/EIS). This plan is intended...
Integrating fire management analysis into land management planning
Thomas J. Mills
1983-01-01
The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lindsay, Haile; Garcia-Santos, Norma; Saverot, Pierre
2012-07-01
The U.S. Nuclear Regulatory Commission (NRC) was established in 1974 with the mission to license and regulate the civilian use of nuclear materials for commercial, industrial, academic, and medical uses in order to protect public health and safety, and the environment, and promote the common defense and security. Currently, approximately half (∼49%) of the workforce at the NRC has been with the Agency for less than six years. As part of the Agency's mission, the NRC has partial responsibility for the oversight of the transportation and storage of radioactive materials. The NRC has experienced a significant level of expertise leavingmore » the Agency due to staff attrition. Factors that contribute to this attrition include retirement of the experienced nuclear workforce and mobility of staff within or outside the Agency. Several knowledge management (KM) initiatives have been implemented within the Agency, with one of them including the formation of a Division of Spent Fuel Storage and Transportation (SFST) KM team. The team, which was formed in the fall of 2008, facilitates capturing, transferring, and documenting regulatory knowledge for staff to effectively perform their safety oversight of transportation and storage of radioactive materials, regulated under Title 10 of the Code of Federal Regulations (10 CFR) Part 71 and Part 72. In terms of KM, the SFST goal is to share critical information among the staff to reduce the impact from staff's mobility and attrition. KM strategies in place to achieve this goal are: (1) development of communities of practice (CoP) (SFST Qualification Journal and the Packaging and Storing Radioactive Material) in the on-line NRC Knowledge Center (NKC); (2) implementation of a SFST seminar program where the seminars are recorded and placed in the Agency's repository, Agency-wide Documents Access and Management System (ADAMS); (3) meeting of technical discipline group programs to share knowledge within specialty areas; (4) development of written guidance to capture 'administrative and technical' knowledge (e.g., office instructions (OIs), generic communications (e.g., bulletins, generic letters, regulatory issue summary), standard review plans (SRPs), interim staff guidance (ISGs)); (5) use of mentoring strategies for experienced staff to train new staff members; (6) use of Microsoft SharePoint portals in capturing, transferring, and documenting knowledge for staff across the Division from Division management and administrative assistants to the project managers, inspectors, and technical reviewers; and (7) development and implementation of a Division KM Plan. A discussion and description of the successes and challenges of implementing these KM strategies at the NRC/SFST will be provided. (authors)« less
Managing Perception: A Twenty-First Century Imperative
2006-02-13
computer users not logged on, insurgents have distributed CDs and DVDs. This material, enhanced with video , soundtracks, and professional editing...news, and bloggers, and e-mails, and digital cameras, and Sony video cams, and all of these things that bring so much information near instantaneously...December 2005. 10 Lolita C. Baldor, Associated Press, “Pentagon Describes Iraq Propaganda Plan,” Miami Herald, 4 December 2005, [article on-line
Code of Federal Regulations, 2012 CFR
2012-01-01
... estate or vehicles, improvement and renovation of space, and repair and maintenance of privately-owned..., papers, and records of the Grantee which are pertinent to the specific grant program for the purpose of... by language to the following effect: “The material is the result of tax-supported research and as...
Code of Federal Regulations, 2013 CFR
2013-01-01
... estate or vehicles, improvement and renovation of space, and repair and maintenance of privately-owned..., papers, and records of the Grantee which are pertinent to the specific grant program for the purpose of... by language to the following effect: “The material is the result of tax-supported research and as...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.
HEMISPHERIC CENTER FOR ENVIRONMENTAL TECHNOLOGY
DOE Office of Scientific and Technical Information (OSTI.GOV)
M.A. Ebadian
1999-07-31
FIU-HCET personnel visited the Special Technologies Laboratory (STL) for discussions with the Principal Investigator (PI) of Laser Induced Fluorescence Imaging (LIFI) and for training in LIFI. Mr. Peter Gibbons, Tanks Retrieval Technology Integration Manager, visited FIU-HCET on July 20, 1999. Mr. Gibbons inspected the pipeline unplugging experimental facility at the HCET testing field. The detailed test bed construction, testing plan, and plugging material specifications were discussed.
ERIC Educational Resources Information Center
Simpson, Kawanna J.; And Others
This guide is intended for use in school-based intervention programs intended to help single parents (particularly teenagers who are expecting or already have a child) master basic money management and consumer skills. The guide is divided into sections dealing with the following topics: interpersonal relationships, value clarification,…
Erin M. Borgman
2013-01-01
As the climate changes and invasive species continue to spread, proactive management may be needed to conserve native plant populations. Selecting appropriate plant material for restoration or other actions that will sustain populations is an integral part of any such plan and must take into account genetic differentiation to limit maladaptation. Common garden studies...
43 CFR 1610.1 - Resource management planning guidance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... interdisciplinary approach shall be used in the preparation, amendment and revision of resource management plans as... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING... and amendment of resource management plans may be provided by the Director and State Director, as...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must my waste management plan be... Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
Space Transportation Materials and Structures Technology Workshop. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Cazier, F. W., Jr. (Compiler); Gardner, J. E. (Compiler)
1992-01-01
The workshop was held to provide a forum for communication within the space materials and structures technology developer and user communities. Workshop participants were organized into a Vehicle Technology Requirements session and three working panels: Materials and Structures Technologies for Vehicle Systems; Propulsion Systems; and Entry Systems. The goals accomplished were (1) to develop important strategic planning information necessary to transition materials and structures technologies from lab research programs into robust and affordable operational systems; (2) to provide a forum for the exchange of information and ideas between technology developers and users; and (3) to provide senior NASA management with a review of current space transportation programs, related subjects, and specific technology needs. The workshop thus provided a foundation on which a NASA and industry effort to address space transportation materials and structures technologies can grow.
Wilderness fire management planning guide
William C. Fischer
1984-01-01
Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.
40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?
Code of Federal Regulations, 2010 CFR
2010-07-01
... location of the public libraries where the public can find your materials separation plan. Include the... separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan...
Radiation therapy for people with cancer: what do written information materials tell them?
Smith, S K; Yan, B; Milross, C; Dhillon, H M
2016-07-01
This study aimed to compare and contrast the contents of different types of written patient information about radiotherapy, namely (1) hospital radiotherapy departments vs. cancer control organisations and (2) generic vs. tumour-specific materials. A coding framework, informed by existing patients' information needs literature, was developed and applied to 54 radiotherapy information resources. The framework comprised 12 broad themes; cancer diagnosis, general information about radiotherapy, treatment planning, daily treatment, side effects, self-care management, external radiotherapy, internal radiotherapy, impact on daily activities, post-treatment, psychosocial health and other content, such as a glossary. Materials produced by cancer organisations contained significantly more information than hospital resources on diagnosis, general radiotherapy information, internal radiotherapy and psychosocial health. However, hospital materials provided more information about treatment planning, daily treatment and the impact on daily activities. Compared to generic materials, tumour-specific resources were superior in providing information about diagnosis, daily treatment, side effects, post-treatment and psychosocial health. Information about internal radiotherapy, prognosis and chronic side effects were poorly covered by most resources. Collectively, hospital and cancer organisation resources complement each other in meeting patients' information needs. Identifying ways to consolidate different information sources could help comprehensively address patients' medical and psychosocial information needs about radiotherapy. © 2015 John Wiley & Sons Ltd.
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
Composite Crew Module: Primary Structure
NASA Technical Reports Server (NTRS)
Kirsch, Michael T.
2011-01-01
In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center to design, build, and test a full-scale crew module primary structure, using carbon fiber reinforced epoxy based composite materials. The overall goal of the Composite Crew Module project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project's baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. This report discusses the project management aspects of the project including team organization, decision making, independent technical reviews, and cost and schedule management approach.
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...
NASA Astrophysics Data System (ADS)
Radło-Kulisiewicz, M.
2015-12-01
The practical importance of Geographical Information Systems in urban planning and managing of urban areas is becoming much more explicit. Managing small cities usually needs simple GIS spatial analysis tools to support planners' decisions. Otherwise, the urban dynamic is bigger and factors affecting changes in city are combined. These analyses are not sufficient and then a need for more advanced and sophisticated solutions can appear. The aim of this article is to introduce popular techniques for urban modelling and underlying importance of GIS as an environment for creating simple models, which let t easy decisions in creating vision of a city be taken. The Article touches on the following issues related to the planning and management of urban space; from the applicable standards concerning materials planning in Poland, through the possibilities that give us network solutions useful at the municipal and country level, to existing techniques in modelling cities in the world. The background for these questions are the Geographical Information Systems (their role in this respect), that naturally fit into this theme. The ability to analyze multi-source data at different levels of detail, in different variants and ranges, predispose the GIS to environmental urban management. While also taking into account social - economic factors, integrated with GIS predictive modeling techniques, allows us to understand dependencies that navigate complex urban phenomena. City management in an integrated and thoughtful manner and will reduce the costs associated with the expansion of the urban fabric and avoid the chaos of urban development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marsha Keister
2001-02-01
DOE Partnerships with States, Tribes and Other Federal Programs Help Responders Prepare for Challenges Involving Transport of Radioactive Materials Implementing adequate institutional programs and validating preparedness for emergency response to radiological transportation incidents along or near U.S. Department of Energy (DOE) shipping corridors poses unique challenges to transportation operations management. Delayed or insufficient attention to State and Tribal preparedness needs may significantly impact the transportation operations schedule and budget. The DOE Transportation Emergency Preparedness Program (TEPP) has successfully used a cooperative planning process to develop strong partnerships with States, Tribes, Federal agencies and other national programs to support responder preparednessmore » across the United States. DOE TEPP has found that building solid partnerships with key emergency response agencies ensures responders have access to the planning, training, technical expertise and assistance necessary to safely, efficiently and effectively respond to a radiological transportation accident. Through the efforts of TEPP over the past fifteen years, partnerships have resulted in States and Tribal Nations either using significant portions of the TEPP planning resources in their programs and/or adopting the Modular Emergency Response Radiological Transportation Training (MERRTT) program into their hazardous material training curriculums to prepare their fire departments, law enforcement, hazardous materials response teams, emergency management officials, public information officers and emergency medical technicians for responding to transportation incidents involving radioactive materials. In addition, through strong partnerships with Federal Agencies and other national programs TEPP provided technical expertise to support a variety of radiological response initiatives and assisted several programs with integration of the nationally recognized MERRTT program into other training venues, thus ensuring consistency of radiological response curriculums delivered to responders. This presentation will provide an overview of the steps to achieve coordination, to avoid redundancy, and to highlight several of the successful partnerships TEPP has formed with States, Tribes, Federal agencies and other national programs. Events, accident scenarios, and training where TEPP was proven to be integral in building the radiological response capabilities for first responders to actual radiological incidents are also highlighted. Participants will gain an appreciation for the collaborative efforts States and Tribes are engaging in with the DOE to ensure that responders all along the DOE transportation corridors are adequately prepared to respond to shipments of radioactive materials through their communities.« less
3D Virtual Environment Used to Support Lighting System Management in a Building
NASA Astrophysics Data System (ADS)
Sampaio, A. Z.; Ferreira, M. M.; Rosário, D. P.
The main aim of the research project, which is in progress at the UTL, is to develop a virtual interactive model as a tool to support decision-making in the planning of construction maintenance and facilities management. The virtual model gives the capacity to allow the user to transmit, visually and interactively, information related to the components of a building, defined as a function of the time variable. In addition, the analysis of solutions for repair work/substitution and inherent cost are predicted, the results being obtained interactively and visualized in the virtual environment itself. The first component of the virtual prototype concerns the management of lamps in a lighting system. It was applied in a study case. The interactive application allows the examination of the physical model, visualizing, for each element modeled in 3D and linked to a database, the corresponding technical information concerned with the use of the material, calculated for different points in time during their life. The control of a lamp stock, the constant updating of lifetime information and the planning of periodical local inspections are attended on the prototype. This is an important mean of cooperation between collaborators involved in the building management.
DOE R&D Accomplishments Database
Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.
1990-04-19
In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.
NASA Technical Reports Server (NTRS)
1974-01-01
A monograph is presented which establishes structural design criteria and recommends practices to ensure the design of sound composite structures, including composite-reinforced metal structures. (It does not discuss design criteria for fiber-glass composites and such advanced composite materials as beryllium wire or sapphire whiskers in a matrix material.) Although the criteria were developed for aircraft applications, they are general enough to be applicable to space vehicles and missiles as well. The monograph covers four broad areas: (1) materials, (2) design, (3) fracture control, and (4) design verification. The materials portion deals with such subjects as material system design, material design levels, and material characterization. The design portion includes panel, shell, and joint design, applied loads, internal loads, design factors, reliability, and maintainability. Fracture control includes such items as stress concentrations, service-life philosophy, and the management plan for control of fracture-related aspects of structural design using composite materials. Design verification discusses ways to prove flightworthiness.
10 CFR 719.10 - What information must be included in the legal management plan?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...
10 CFR 719.10 - What information must be included in the legal management plan?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...
10 CFR 719.10 - What information must be included in the legal management plan?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...
LONG-RANGE PLANNING FOR SMALL BUSINESSES.
MANAGEMENT PLANNING AND CONTROL, COMMERCE), (*COMMERCE, MANAGEMENT PLANNING AND CONTROL), PERSONNEL MANAGEMENT , PRODUCTION CONTROL, BUDGETS, OPERATIONS RESEARCH, ECONOMICS, DECISION MAKING, MANAGEMENT ENGINEERING
40 CFR 60.1060 - What steps must I complete for my materials separation plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What steps must I complete for my... Requirements: Materials Separation Plan § 60.1060 What steps must I complete for my materials separation plan? (a) For your materials separation plan, you must complete nine steps: (1) Prepare a draft materials...
3/1/2018: Data Management Plan Webinar | National Agricultural Library
News Contact Us Search ï Log inRegister Home Home 3/1/2018: Data Management Plan Webinar Creating a Data Management Plan Webinar The original broadcast date of this webinar has passed, but you can view learn how to create a data management plan. Creating a Data Management Plan Tuesday, March 20 @ 1:00 PM
25 CFR 166.311 - Is an Indian agricultural resource management plan required?
Code of Federal Regulations, 2010 CFR
2010-04-01
... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166.311 Is an Indian agricultural resource management plan required? (a) Indian agricultural land under... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... when they are needed to address water quality problems. (1) Total maximum daily loads. TMDLs in...
Forest Resource Management Plans: A Sustainability Approach
ERIC Educational Resources Information Center
Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.
2012-01-01
Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…
The first Spacelab payload - A joint NASA/ESA venture
NASA Technical Reports Server (NTRS)
Kennedy, R.; Pace, R.; Collet, J.; Sanfourche, J. P.
1977-01-01
Planning for the 1980 qualification flight of Spacelab, which will involve a long module and one pallet, is discussed. The mission will employ two payload specialists, one sponsored by NASA and the other by ESA. Management of the Spacelab mission functions, including definition and execution of the on-board experiments, development of the experimental hardware and training of the payload specialists, is considered; studies proposed in the areas of atmospheric physics, space plasma physics, solar physics, earth observations, astronomy, astrophysics, life sciences and material sciences are reviewed. Analyses of the Spacelab environment and the Spacelab-to-orbiter and Spacelab-to-experiment interactions are also planned.
Transuranic Waste Test Facility Development Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looper, M.G.
1987-05-05
This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less
Assessment of medical waste management at a primary health-care center in Sao Paulo, Brazil
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moreira, A.M.M., E-mail: anamariainforme@hotmail.com; Guenther, W.M.R.
Highlights: Black-Right-Pointing-Pointer Assessment of medical waste management at health-care center before/after intervention. Black-Right-Pointing-Pointer Qualitative and quantitative results of medical waste management plan are presented. Black-Right-Pointing-Pointer Adjustments to comply with regulation were adopted and reduction of waste was observed. Black-Right-Pointing-Pointer The method applied could be useful for similar establishments. - Abstract: According to the Brazilian law, implementation of a Medical Waste Management Plan (MWMP) in health-care units is mandatory, but as far as we know evaluation of such implementation has not taken place yet. The purpose of the present study is to evaluate the improvements deriving from the implementation of amore » MWMP in a Primary Health-care Center (PHC) located in the city of Sao Paulo, Brazil. The method proposed for evaluation compares the first situation prevailing at this PHC with the situation 1 year after implementation of the MWMP, thus allowing verification of the evolution of the PHC performance. For prior and post-diagnosis, the method was based on: (1) application of a tool (check list) which considered all legal requirements in force; (2) quantification of solid waste subdivided into three categories: infectious waste and sharp devices, recyclable materials and non-recyclable waste; and (3) identification of non-conformity practices. Lack of knowledge on the pertinent legislation by health workers has contributed to non-conformity instances. The legal requirements in force in Brazil today gave origin to a tool (check list) which was utilized in the management of medical waste at the health-care unit studied. This tool resulted into an adequate and simple instrument, required a low investment, allowed collecting data to feed indicators and also conquered the participation of the unit whole staff. Several non-conformities identified in the first diagnosis could be corrected by the instrument utilized. Total waste generation increased 9.8%, but it was possible to reduce the volume of non-recyclable materials (11%) and increase the volume of recyclable materials (4%). It was also possible to segregate organic waste (7%), which was forwarded for production of compost. The rate of infectious waste generation in critical areas decreased from 0.021 to 0.018 kg/procedure. Many improvements have been observed, and now the PHC complies with most of legal requirements, offers periodic training and better biosafety conditions to workers, has reduced the volume of waste sent to sanitary landfills, and has introduced indicators for monitoring its own performance. This evaluation method might subsidize the creation and evaluation of medical waste management plans in similar heath institutions.« less
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What is a waste management plan? 62...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On Or Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-20
... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...
Objective necessity of socialist family planning: a trial discussion.
Li, R
1985-07-01
On the basis of Marx and Engels' prediction and thesis of scientific socialism, socialist China, the most populous nation in the world, is the 1st to have realized the planned management of population reproductive in the history of mankind, thus giving an answer to the problem in practice. This paper makes a tentative exploration of such a necessity in socialist family planning. Engels points out that 1) under private ownership, population reproduction takes class antagonism as the basis, while public ownership of the means of production eradicates it; 2) in capitalist society, the reproduction of the labor force is commodity reproduction--public ownership of the means of production can be divorced from the domain of commodity; and 3) under private ownership, population reproduction is purely the private business of an individual or a family whose economic benefit forms the motive force of population reproduction--public ownership liberates it from one's personal gains making it a public affair. The great significance of family planning to economic development can be recognized as production, consumption, and accumulation. Taking family planning as the basis for the reproduction plan of the labor force is the guarantee of realizing the material production plan. Family planning reflects the trend of the structure and change of consumer requirements and provides the direct and indirect objectives of various items of material production planning; it provides the objective basis for social accumulation and the arrangement of expanding reproduction. 3 conclusions are derived: 1) the building up of the public ownership of the means of production affords man the possibility to regulate the production of matter as well as man, 2) the characteristics of the planned development of a socialist national economy demands the planned production of man, and 3) family planning and the development of a socialist economy demand their mutual congruence.
Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-24
This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less
NASA Astrophysics Data System (ADS)
Chen, Tzikang J.; Shiao, Michael
2016-04-01
This paper verified a generic and efficient assessment concept for probabilistic fatigue life management. The concept is developed based on an integration of damage tolerance methodology, simulations methods1, 2, and a probabilistic algorithm RPI (recursive probability integration)3-9 considering maintenance for damage tolerance and risk-based fatigue life management. RPI is an efficient semi-analytical probabilistic method for risk assessment subjected to various uncertainties such as the variability in material properties including crack growth rate, initial flaw size, repair quality, random process modeling of flight loads for failure analysis, and inspection reliability represented by probability of detection (POD). In addition, unlike traditional Monte Carlo simulations (MCS) which requires a rerun of MCS when maintenance plan is changed, RPI can repeatedly use a small set of baseline random crack growth histories excluding maintenance related parameters from a single MCS for various maintenance plans. In order to fully appreciate the RPI method, a verification procedure was performed. In this study, MC simulations in the orders of several hundred billions were conducted for various flight conditions, material properties, and inspection scheduling, POD and repair/replacement strategies. Since the MC simulations are time-consuming methods, the simulations were conducted parallelly on DoD High Performance Computers (HPC) using a specialized random number generator for parallel computing. The study has shown that RPI method is several orders of magnitude more efficient than traditional Monte Carlo simulations.
Sharma, Ravi; Manikandhan, R; Sneha, P; Parameswaran, Anantanarayanan; Kumar, J Naveen; Sailer, Hermann F
2017-01-01
Management of temporomandibular joint (TMJ) ankylosis is a challenging and rather daunting task owing to complex abnormal anatomy and its sequel to craniofacial structures. Various autogenous grafts and alloplastic materials have been tried with variable success for creation of a near-normal joint. In recent years, neocondyle distraction has added a new dimension to the management of TMJ ankylosis. The aim of this paper is to describe the role of neocondyle distraction in TMJ ankylosis. Neocondyle distraction was carried out in five patients with TMJ ankylosis following gap arthroplasty. Computed tomogram scans were taken before surgery and 1-year postdistraction for surgical planning and postoperative assessment, respectively. The intraoral distractors (KLS Martin, Jacksonville, FL, USA) were used in this study. All five patients reported with adequate mouth opening and functional jaw movements. The procedure was well tolerated by all the patients. None of the patients underwent reankylosis following neocondyle distraction. With proper surgical planning and distraction protocol, neocondyle distraction is an effective and safe technique for TMJ reconstruction and preventing reankylosis.
40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...
40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...
40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...
40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How do I make my draft materials... Preconstruction Requirements: Materials Separation Plan § 60.1070 How do I make my draft materials separation plan available to the public? (a) Distribute your draft materials separation plan to the main public libraries in...
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
Bowen, Jo; Davies, Laurie; Burdett, Garry John; Barber, Christopher Michael
2017-01-01
The duty to manage asbestos in non-domestic premises is described in the Control of Asbestos Regulations 2012. Health and Safety Executive (HSE) policy and guidance on asbestos in the built environment in Great Britain is that asbestos-containing materials (ACMs) that are in good condition and unlikely to be disturbed can be managed in place. Where ACMs are in poor condition or likely to be disturbed they should be repaired, encapsulated or, if necessary, removed. HSE and Government Office for Science hosted a stakeholder workshop to consider evidence on the management of ACMs in public buildings. Invitees attended from a range of backgrounds (including regulatory, government, academic, medical, public interest groups, and professional service providers). Participants considered the evidence, suggested nine evidence gap areas and ranked these according to preference in an anonymous vote. The top three suggested evidence gaps were: (i) the comparative risks of managing ACMs in place versus removal; (ii) improved measurement techniques at lower fibre concentrations; and (iii) building the evidence base on the effectiveness of asbestos management and safe removal. HSE will use the workshop outputs to inform its research planning. It is anticipated that a number of initiatives for shared research will be explored. © Crown copyright 2017.
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...
30 CFR 71.301 - Respirable dust control plan; approval by District Manager and posting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... District Manager and posting. 71.301 Section 71.301 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... plan; approval by District Manager and posting. (a) The District Manager will approve respirable dust control plans on a mine-by-mine basis. When approving respirable dust control plans, the District Manager...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-18
...] Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior Planning Area... Management (BLM) Anchorage Field Office, Anchorage, Alaska, intends to prepare a Resource Management Plan... properties, visual resources, wildland fire management, lands with wilderness characteristics, forestry...
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for..., 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...
25 CFR 161.200 - Is an Indian agricultural resource management plan required?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... resource management plan required? (a) Yes, Navajo Partitioned Lands must be managed in accordance with the goals and objectives in the agricultural resource management plan developed by the Navajo Nation, or by...
John M. Halstead; Cindy M. Brown; Albert E. Luloff; Bruce E. Lindsay
1992-01-01
The management plan for the Pemigewasset Wilderness Area of New Hampshire represents a departure from traditional plans. Results of this study indicate limited evidence of the Pemigewasset Wilderness Management Plan (PWMP), as currently implemented, having a large direct impact on diverting hikers from their planned destinations and promoting dispersed usage and low...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...
Solid waste management in Abuja, Nigeria.
Imam, A; Mohammed, B; Wilson, D C; Cheeseman, C R
2008-01-01
The new city of Abuja provided an opportunity to avoid some of the environmental problems associated with other major cities in Africa. The current status of solid waste management in Abuja has been reviewed and recommendations for improvements are made. The existing solid waste management system is affected by unfavourable economic, institutional, legislative, technical and operational constraints. A reliable waste collection service is needed and waste collection vehicles need to be appropriate to local conditions. More vehicles are required to cope with increasing waste generation. Wastes need to be sorted at source as much as possible, to reduce the amount requiring disposal. Co-operation among communities, the informal sector, the formal waste collectors and the authorities is necessary if recycling rates are to increase. Markets for recycled materials need to be encouraged. Despite recent improvements in the operation of the existing dumpsite, a properly sited engineered landfill should be constructed with operation contracted to the private sector. Wastes dumped along roads, underneath bridges, in culverts and in drainage channels need to be cleared. Small-scale waste composting plants could promote employment, income generation and poverty alleviation. Enforcement of waste management legislation and a proper policy and planning framework for waste management are required. Unauthorized use of land must be controlled by enforcing relevant clauses in development guidelines. Accurate population data is necessary so that waste management systems and infrastructure can be properly planned. Funding and affordability remain major constraints and challenges.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, Jack C.P., E-mail: cejcheng@ust.hk; Ma, Lauren Y.H., E-mail: yingzi@ust.hk
Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R wastemore » disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.« less
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
76 FR 53149 - North American Waterfowl Management Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...
41 CFR 102-192.80 - How do we develop written security policies and plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...) Operating procedures; (d) Plan to provide a visible mail screening operation; (e) Training mail center...) Managing threats; (h) Communications plan; (i) Occupant Emergency Plan (OEP); (j) Continuity of Operations...
Strategic Planning and Financial Management
ERIC Educational Resources Information Center
Conneely, James F.
2010-01-01
Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…
NASA Astrophysics Data System (ADS)
Yao, D.; Dai, D. S.; Tang, Y. Z.; Zhu, G. Y.; Chen, X.
2015-08-01
At the turn of the century, a series of new heritage concepts have appeared in the area of international cultural heritage protection, such as cultural landscape, cultural route, heritage corridor, heritage canal, which presents the development of people's recognition of cultural heritage. According to The Operational Guidelines for the Implementation of the World Heritage Convention, management planning must be contained in the material used to apply for world heritage. The State Administration of Cultural Heritage designed the mission and work schedule of China's Grand Canal conservation planning in 2008. This research will introduce the working system of China's Grand Canal conservation planning on three levels: city, province and nation. It will also summarize the characteristics of the core technologies in China's Grand Canal conservation planning, including key issues like the identification of the core characteristic of China's Grand Canal, value assessment and determination of the protection scope. Through reviewing, thinking and analyzing the previous accomplishments, the research will offer some advices for the similar world heritage conservation planning after.
Management Plans Technical Appendix - Phase 1 (Central Puget Sound). Volume 4
1988-06-01
measure without substantially more samples and analysis or significantly reducing the desired confidence level . Consequently, the study participants...disposal occurs in ac- (9) An application and a lease fee will be charged at a cordance with permit conditions. Compliance measures rate sufficient to...site are sufficient to characterize the material. The bloassays are a cost effective measure of the biological effects of concern within the disposal
NASA Astrophysics Data System (ADS)
Colladay, R. S.; Carlisle, R. F.
1984-10-01
Some of the most significant advances made in the space station discipline technology program are examined. Technological tasks and advances in the areas of systems/operations, environmental control and life support systems, data management, power, thermal considerations, attitude control and stabilization, auxiliary propulsion, human capabilities, communications, and structures, materials, and mechanisms are discussed. An overview of NASA technology planning to support the initial space station and the evolutionary growth of the space station is given.
Financial Improvement and Audit Readiness (FIAR) Plan Status Report
2011-05-01
integrated personnel and pay system that will consolidate Guard, Reserve, and Active Duty Military into a single system for personnel and pay...Inventory The DLA is the integrated material manager for assigned federal supply classes. The DLA holds materiel based on military and...Monitoring DoD Component progress and holding them accountable is essential to success and to achieving the Department’s commitment to audit readiness by
Defense Infrastructure: Actions Needed to Strengthen Utility Resilience Planning
2016-11-01
and design , historical architecture and materials, and overhead; and inflation adjustments. 6We obtained and analyzed records from DOD’s Real...the impacts of those disruptions, and the characteristics of the DOD-owned utility systems, among other things. To inform the design of our survey...managing and operating DOD-owned utility systems. Furthermore, the survey instrument was independently reviewed by a survey design expert within GAO. We
Defense Facility Condition: Revised Guidance Needed to Improve Oversight of Assessments and Ratings
2016-06-01
are to implement the standardized process in part by assessing the condition of buildings, pavement , and rail using the same set of software tools...facility to current standards; costs for labor, equipment, materials, and currency exchange rates overseas; costs for project planning and design ...example, the services are to assess the condition of buildings, pavement , and rail using Sustainment Management System software tools developed by the
TEMA-DOE annual report, July 1, 1997--June 30, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-09-01
The Tennessee Emergency Management Agency (TEMA) will develop off-site Multi-Jurisdictional Emergency Response Plans (MJERPs) in coordination with Federal, State, and local agencies. The MJERPs will describe actions to minimize the risks to the citizens of Tennessee as a result of an off-site release of hazardous material from the DOE Oak Ridge Reservation. This report describes actions made during each quarter of the year.
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing...
40 CFR 60.2625 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2625 When must I submit my waste management plan? You must submit a waste management plan no...
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...