Sample records for materials final subcontract

  1. Final Report: Sintered CZTS Nanoparticle Solar Cells on Metal Foil; July 26, 2011 - July 25, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leidholm, C.; Hotz, C.; Breeze, A.

    2012-09-01

    This is the final report covering 12 months of this subcontract for research on high-efficiency copper zinc tin sulfide (CZTS)-based thin-film solar cells on flexible metal foil. Each of the first three quarters of the subcontract has been detailed in quarterly reports. In this final report highlights of the first three quarters will be provided and details will be given of the final quarter of the subcontract.

  2. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    DTIC Science & Technology

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  3. 48 CFR 49.606 - Granting subcontract settlement authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-furnished material or articles completed but undelivered under the subcontract or purchase order, as these... articles may be disposed of without Government approval or screening if the total amount (at subcontract... retention or other disposal of termination inventory allocated to the settlement proposal. (ii) Deduct...

  4. SIG Galileo final converter technical summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinderman, J.D.

    1979-05-01

    The report is primarily concerned with the work performed for DOE on converter development and fabrication for the NASA Galileo Jupiter mission as a DOE prime contractor with interface primarily with Teledyne Energy Systems. The activities reported on were directed toward design, analysis and testing of modules and converters SN-1 thru SN-7 and attendant Quality Control and Reliability effort. Although assembly and testing of SN-1 was not accomplished due to the stop work order, the design was virtually completed and a significant amount of subcontracting and manufacturing of both module and converter components was underway. These subcontracting and manufacturing activitiesmore » were selectively closed down depending upon degree of completion and material or hardware potential usage in the Technology Program.« less

  5. 48 CFR 227.304-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracts 227.304-1 General. Interim and final invention reports and notification of all subcontracts for... of Inventions and Subcontracts. [56 FR 36389, July 31, 1991, as amended at 57 FR 53600, Nov. 12, 1992] ...

  6. Annual Report: Photovoltaic Subcontract Program FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Summers, K. A.

    1991-03-01

    This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less

  7. High Throughput Manufacturing of Thin-Film CdTe Photovoltaic Materials; Final Subcontract Report, 16 November 1993-31 December 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D. W.

    1999-09-02

    This report describes work performed by Solar Cells, Inc. (SCI), during this Photovoltaic Manufacturing Technology (PVMaT) subcontract. Cadmium telluride (CdTe) is recognized as one of the leading materials for low-cost photovoltaic modules. SCI has developed this technology and is preparing to scale its pilot production capabilities to a multi-megawatt level. This four-phase PVMaT subcontract supports these efforts. The work was related to product definition, process definition, equipment engineering, and support programs development. In the area of product definition and demonstration, two products were specified and demonstrated-a grid-connected, frameless, high-voltage product that incorporates a pigtail potting design and a remote low-voltagemore » product that may be framed and may incorporate a junction box. SCI produced a 60.3-W thin-film CdTe module with total-area efficiency of 8.4%; SCI also improved module pass rate on the interim qualification test protocol from less than 20% to 100% as a result of work related to the subcontract. In the manufacturing process definition area, the multi-megawatt manufacturing process was defined, several of the key processes were demonstrated, and the process was refined and proven on a 100-kW pilot line that now operates as a 250-kW line. In the area of multi-megawatt manufacturing-line conceptual design review, SCI completed a conceptual layout of the multi-megawatt lines. The layout models the manufacturing line and predicts manufacturing costs. SCI projected an optimized capacity, two-shift/day operation of greater than 25 MW at a manufacturing cost of below $1.00/W.« less

  8. Evaluation of Subcontract Price Proposals

    DTIC Science & Technology

    1990-04-09

    This is the final report on the Audit of the Evaluation of Subcontract Price Proposals. Comments on a draft of this report were considered in...preparing the final report. We made the audit from October 1987 through May 198% The initial objectives of the audit were to evaluate procedures used by...assist audit reports were used by procurement contracting officers in negotiating contract prices. During the audit , we expanded our objectives to

  9. High Efficiency Thin Film CdTe and a-Si Based Solar Cells: Final Technical Report, 4 March 1998--15 October 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Compaan, A. D.; Deng, X.; Bohn, R. G.

    2003-10-01

    This is the final report covering about 42 months of this subcontract for research on high-efficiency CdTe-based thin-film solar cells and on high-efficiency a-Si-based thin-film solar cells. Phases I and II have been extensively covered in two Annual Reports. For this Final Report, highlights of the first two Phases will be provided and then detail will be given on the last year and a half of Phase III. The effort on CdTe-based materials is led by Prof. Compaan and emphasizes the use of sputter deposition of the semiconductor layers in the fabrication of CdS/CdTe cells. The effort on high-efficiency a-Simore » materials is led by Prof. Deng and emphasizes plasma-enhanced chemical vapor deposition for cell fabrication with major efforts on triple-junction devices.« less

  10. Federal employees health benefits acquisition regulation: large provider agreements, subcontracts, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The Office of Personnel Management (OPM) is issuing this final regulation to amend the Federal Employees Health Benefits Acquisition Regulation (FEHBAR). It establishes requirements, including audit, for Federal Employees Health Benefits Program (FEHB) experience-rated carriers' Large Provider Agreements. It also modifies the dollar threshold for review of carriers' subcontract agreements; revises the definitions of Cost or Pricing Data and Experience-rate to reflect mental health parity requirements; updates the contract records retention requirement; updates the FEHB Clause Matrix; and conforms subpart and paragraph references to Federal Acquisition Regulation (FAR) revisions made since we last updated the FEHBAR.

  11. Photovoltaic Subcontract Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surek, Thomas; Catalano, Anthony

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  12. Subcontracted activities related to TES for building heating and cooling

    NASA Technical Reports Server (NTRS)

    Martin, J.

    1980-01-01

    The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.

  13. Photovoltaic Subcontract Program. Annual report, FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  14. Yucca Mountain Project Integrated Data System (IDS); Final report, October 1, 1989--December 31, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1991-05-23

    This final report for LANL Subcontract 9-XS8-2604-1 includes copies of all formal letters, memorandums, and reports provided by CAG to support the IDS effort in the LANL Test Managers Office, Las Vegas, Nevada from October 1, 1989 through the end of the contract on December 31, 1990. The material is divided into two sections; the Functional Requirements Document (FRD) and other reports, letters, and memorandums. All documents are arranged in chronological order with most recent last. Numerous draft copies of the FRD were prepared and cover sheets for all drafts are included. The complete text of only the last versionmore » supplied (July 27, 1990) is included in this document.« less

  15. High Technology Engineering Services, Inc. fiscal year 1993 and 1994 research and development report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document has been prepared by the Professional Staff of High Technology Engineering Services, Inc. (HTES) for fiscal year (FY) 1993. Work was performed for various aspects of mechanical design and analysis, materials development and properties quantification, nuclear environment performance, and engineering program prioritization. The tasks enumerated in the subcontract, attachment B are: 1. Assist in preparation of final R&D report for SDC detector development. 2. Subcontractor shall make contributions to the development of innovative processes for the manufacture of quasi- isotropic, enhanced thermal conductivity compression molded advanced composite materials. 3. Perform finite element analysis as it relates to themore » Superconducting Super Collider Silicon Tracking System, both mechanical and thermal, of very thin section advanced composite materials. 4. Subcontractor shall perform technical studies, reviews, and assessments of the current program for advanced composites materials processing and testing. 5. Subcontractor shall attend meetings and discussions as directed by MEE-12 technical representative. Unfortunately during the course of FY93, technical and financial challenges prevailed against the aggressive goals set for the program. In point of fact, less than 25% of the contract value was able to be expended due to technical delays and programmatic funding cuts. Also, contracting difficulties with the SSC Lab and financial burdens at Los Alamos totally stopped progress on the subject subcontract during the whole of FY94. This was a great blow to me and the HTES, Inc. technical staff. Despite the negative influences over the years, significant progress was made in materials properties quantification and development of essential research and development documentation. The following brief report and attendant appendices will address these achievements.« less

  16. Improved Transparent Conducting Oxides for Photovoltaics: Final Research Report, 1 May 1999--31 December 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mason, T. O.; Chang, R. P. H.; Marks, T. J.

    2003-10-01

    This subcontract focused on next-generation transparent conducting oxides (TCOs) for improved PV performance. More specifically, there were two research foci: (1) improved Sn-based, n-type TCOs aimed at enhanced CdTe PV cell performance, and (2) novel Cu-based, p-type TCOs applicable to a variety of PV designs. The objective of the research under this subcontract was to identify, explore, evaluate, and develop future generations of photovoltaic technologies that can meet the long-term goal of producing low-cost electricity from sunlight.

  17. Solar project cost report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, H.J.

    1978-01-01

    This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less

  18. 48 CFR 970.4402-4 - Nuclear material transfers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Nuclear material transfers... 970.4402-4 Nuclear material transfers. (a) Management and operating contractors, in preparing... nuclear material, shall be required to assure that each such subcontract or agreement contains a— (1...

  19. 48 CFR 970.4402-4 - Nuclear material transfers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Nuclear material transfers... 970.4402-4 Nuclear material transfers. (a) Management and operating contractors, in preparing... nuclear material, shall be required to assure that each such subcontract or agreement contains a— (1...

  20. 48 CFR 970.4402-4 - Nuclear material transfers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Nuclear material transfers... 970.4402-4 Nuclear material transfers. (a) Management and operating contractors, in preparing... nuclear material, shall be required to assure that each such subcontract or agreement contains a— (1...

  1. 48 CFR 970.4402-4 - Nuclear material transfers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Nuclear material transfers... 970.4402-4 Nuclear material transfers. (a) Management and operating contractors, in preparing... nuclear material, shall be required to assure that each such subcontract or agreement contains a— (1...

  2. 48 CFR 970.4402-4 - Nuclear material transfers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Nuclear material transfers... 970.4402-4 Nuclear material transfers. (a) Management and operating contractors, in preparing... nuclear material, shall be required to assure that each such subcontract or agreement contains a— (1...

  3. Black liquor gasification phase 2D final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohl, A.L.; Stewart, A.E.

    1988-06-01

    This report covers work conducted by Rockwell International under Amendment 5 to Subcontract STR/DOE-12 of Cooperative Agreement DE-AC-05-80CS40341 between St. Regis Corporation (now Champion International) and the Department of Energy (DOE). The work has been designated Phase 2D of the overall program to differentiate it from prior work under the same subcontract. The overall program is aimed at demonstrating the feasibility of and providing design data for the Rockwell process for gasifying Kraft black liquor. In this process, concentrated black liquor is converted into low-Btu fuel gas and reduced melt by reaction with air in a specially designed gasification reactor.

  4. 75 FR 70031 - Antitrust Division

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ...) operate a branding program based upon distinctive trademarks to create high customer awareness of, demand... or subcontract a branding program; (vii) create printed and/or electronic materials for distribution...

  5. The Photovolatic Manufacturing Technology project (PVMaT) after three years

    NASA Astrophysics Data System (ADS)

    Witt, C. Edwin; Mitchell, Richard L.; Thomas, Holly; Herwig, Lloyd O.

    1994-08-01

    The Photovoltaic Manufacturing Technology project (PVMaT) is a government/industry research and development (R&D) partnership involving joint efforts between the federal government (through the US Department of Energy (DOE)) and members of the US photovoltaic (PV) industry. The project's goal is to assist US industry in retaining and extending its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is being carried out in three separate phases, each designed to address separate R&D requirements for achieving PVMaT goals. Phase 1 was a problem identification phase of about 3 months duration. In Phase 1, the status and needs of the US PV manufacturing industry were identified, and the development of a Phase 2 procurement responsive to the industry's needs was begun. Phase 1 was completed in 1991. Problem solution began in 1992, under Phase 2A, when DOE awarded multiyear subcontracts. Technical accomplishments for PVMaT 2A are presented in this paper. Subcontracts were recently awarded for a second, overlapping, and similar process-specific solicitation (PVMaT 2B). The activities of these new subcontracts are also described. Two subcontracts presently comprise the Phase 3 effort. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. A teamed research approach is being used to improve automated module manufacturing lines and encapsulation materials used in module manufacturing. The first year's work on these subcontracts is also described in this paper.

  6. 48 CFR 2052.215-75 - Proposal presentation and format.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., education, and employment history of its employees, subcontractor personnel, and consultants, through... and categories, materials, subcontracts, travel, computer time, etc., must be included so that the...

  7. The Grid Analysis and Display System (GrADS)

    NASA Technical Reports Server (NTRS)

    Kinter, James L., III

    1994-01-01

    During the period 1 September 1993 - 31 August 1994, further development of the Grid Analysis and Display System (GrADS) was conducted at the Center for Ocean-Land-Atmosphere Studies (COLA) of the Institute of Global Environment and Society, Inc. (IGES) under subcontract 5555-31 from the University Space Research Association (USRA) administered by The Center of Excellence in Space Data and Information Sciences (CESDIS). This final report documents progress made under this subcontract and provides directions on how to access the software and documentation developed therein. A short description of GrADS is provided followed by summary of progress completed and a summary of the distribution of the software to date and the establishment of research collaborations.

  8. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  9. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  10. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  11. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...

  12. Connected Vehicle Pilot Deployment Program phase 1 : partnership status summary : New York City : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the process and status of developing and implementing agreements, contracts and subcontracts among partner organizations in the New York City Connected Vehicle Pilot Deployment (NYC CVPD). Details include the work elements as ...

  13. Large-area triple-junction a-Si alloy production scaleup. Annual subcontract report, 17 March 1993--18 March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oswald, R.; Morris, J.

    1994-11-01

    The objective of this subcontract over its three-year duration is to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance and expand the Solarex commercial production capacity. Solarex shall meet these objectives by improving the deposition and quality of the transparent front contact, by optimizing the laser patterning process, scaling-up the semiconductor deposition process, improving the back contact deposition, scaling-up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 2 portion of this subcontract, Solarex focused on improving deposition of the front contact, investigating alternate feed stocks for the front contact,more » maximizing throughput and area utilization for all laser scribes, optimizing a-Si:H deposition equipment to achieve uniform deposition over large-areas, optimizing the triple-junction module fabrication process, evaluating the materials to deposit the rear contact, and optimizing the combination of isolation scribe and encapsulant to pass the wet high potential test. Progress is reported on the following: Front contact development; Laser scribe process development; Amorphous silicon based semiconductor deposition; Rear contact deposition process; Frit/bus/wire/frame; Materials handling; and Environmental test, yield and performance analysis.« less

  14. Extraction of volatile and metals from extraterrestrial materials

    NASA Technical Reports Server (NTRS)

    Lewis, John S.

    1990-01-01

    Since March 1, 1989, attention was concentrated on the extraction of ilmenite from extraterrestrial materials and on the planning and development of laboratory facilities for carbonyl extraction of ferrous metal alloys. Work under three subcontracts was administered by this project: (1) electrolytic production of oxygen from molten lunar materials; (2) microwave processing of lunar materials; and (3) production of a resource-oriented space science data base.

  15. Final Technical Report for subcontract number B612144

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mayali, X.; Marcu, O.

    The original statement of work stipulated that the Subcontractor shall perform bacterial and algal cultivation and manipulation, microbe isolation, preparation of samples for sequencing and isotopic analysis, data analysis, and manuscript preparation. The Subcontractor shall work closely with Dr. Mayali and other LLNL scientists, and shall participate in monthly SFA meetings (either in person or by telephone). The Subcontractor shall deliver a final report at the conclusion of the work.

  16. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  17. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  18. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  19. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  20. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  1. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND... notify the Contracting officer in writing at least 30 days in advance of entering into any subcontract or...

  2. 75 FR 32723 - Revision of Department of Homeland Security Acquisition Regulation; Limitations on Subcontracting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... terrorism or other man-made disaster. DATES: Comments and related material submitted electronically must be... from a natural disaster or act of terrorism or other man-made disaster. Congress enacted this...

  3. NFIRAOS in 2015: engineering for future integration of complex subsystems

    NASA Astrophysics Data System (ADS)

    Atwood, Jenny; Andersen, David; Byrnes, Peter; Densmore, Adam; Fitzsimmons, Joeleff; Herriot, Glen; Hill, Alexis

    2016-07-01

    The Narrow Field InfraRed Adaptive Optics System (NFIRAOS) will be the first-light facility Adaptive Optics (AO) system for the Thirty Meter Telescope (TMT). NFIRAOS will be able to host three science instruments that can take advantage of this high performance system. NRC Herzberg is leading the design effort for this critical TMT subsystem. As part of the final design phase of NFIRAOS, we have identified multiple subsystems to be sub-contracted to Canadian industry. The scope of work for each subcontract is guided by the NFIRAOS Work Breakdown Structure (WBS) and is divided into two phases: the completion of the final design and the fabrication, assembly and delivery of the final product. Integration of the subsystems at NRC will require a detailed understanding of the interfaces between the subsystems, and this work has begun by defining the interface physical characteristics, stability, local coordinate systems, and alignment features. In order to maintain our stringent performance requirements, the interface parameters for each subsystem are captured in multiple performance budgets, which allow a bottom-up error estimate. In this paper we discuss our approach for defining the interfaces in a consistent manner and present an example error budget that is influenced by multiple subsystems.

  4. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracts and work... Subcontracts and work coordination. The contracting officer shall insert the clause at 852.236-80, Subcontracts and work coordination, in solicitations and contracts for construction expected to exceed the micro...

  5. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  6. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  7. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  8. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  9. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  10. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  11. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  12. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  13. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  14. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  15. 48 CFR 1052.219-71 - Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...

  16. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  17. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services. >

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Subcontracting for nuclear... Clauses 952.225-70 Subcontracting for nuclear hot cell services.> As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  18. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  19. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  20. Draft final report : musculoskeletal disorders II, spinal cord injury and commercial motor vehicle driver safety (comprehensive review).

    DOT National Transportation Integrated Search

    2009-03-20

    This report was prepared by ECRI Institute under subcontract to MANILA Consulting Group, Inc., which holds prime GS-10F-0177N/DTMC75-06-F-00039 with the Department of Transportations Federal Motor Carrier Safety Administration. ECRI Institute is a...

  1. 48 CFR 2152.244-70 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract... consideration controlling establishment of initial or revised prices; (iii) The reason cost or pricing data were... subcontractor's cost or pricing data in determining the price objective and in negotiating the final price; (v...

  2. 48 CFR 212.570 - Applicability of certain laws to contracts and subcontracts for the acquisition of commercially...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to.... 2533b, Requirement to buy strategic materials critical to national security from American sources, is...

  3. 48 CFR 212.570 - Applicability of certain laws to contracts and subcontracts for the acquisition of commercially...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to.... 2533b, Requirement to buy strategic materials critical to national security from American sources, is...

  4. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  5. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  6. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  7. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  8. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  9. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  10. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  11. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  12. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  13. Interface definition for the Far Ultraviolet Spectrometer Experiment S169

    NASA Technical Reports Server (NTRS)

    Fastie, W. G.

    1971-01-01

    A final contract for development, fabrication, test and flight of the ultraviolet spectrometer experiment on an Apollo space mission is reported. Two interface control documents were completed and signed off and three more were essentially completed. Supporting preliminary concepts formulation, design study and component investigation, specification and subcontract negotiation were accomplished.

  14. Automated System for Aneuploidy Detection in Sperm Final Report CRADA No. TC-1364-96: Phase I SBIR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wyrobek, A. J.; Dunlay, R. T.

    This project was a relationship between Lawrence Livermore National Laboratory (LLNL) and Biological Detection, Inc. (now known as Cellomics, Inc.) It was funded as a Phase I SBIR from the National Institutes of Health (NIH) awarded to Cellomics, Inc. with a subcontract to LLNL.

  15. Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.

  16. Reaching the Environmental Community: Designing an Information Program for the NREL Biofuels Program; May 2002-May 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ames, J.; Werner, C.

    2003-08-01

    Final report on subcontract for holding two briefings for policymakers and the environmental community on environmental issues related to biofuels; one on one on the energy and environmental issues associated with biofuels production and use, and the other on implications of pending renewable fuels standard legislation.

  17. Economic Value of Army Foreign Military Sales

    DTIC Science & Technology

    2015-12-01

    12 2. Direct Commercial Sales vs. Foreign Military Sales .....................15 3...the final bill to the customer, and the DSCA sends a closure certificate to DFAS. 2. Direct Commercial Sales vs. Foreign Military Sales Direct ...is defined as the “coproduction, licensed production, countertrade, subcontracting, and technology transfer—mandated by foreign governments as a

  18. 48 CFR 2019.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705-4 Reviewing the subcontracting plan...

  19. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...

  20. Billie Christen | NREL

    Science.gov Websites

    , administration, and placement of subcontracts for both centers, ensuring that the objectives are met and that the develop budgets for subcontracts and makes sure the subcontracts are properly initiated and closed out in

  1. Nuclear Lunar Logistics Study

    NASA Technical Reports Server (NTRS)

    1963-01-01

    This document has been prepared to incorporate all presentation aid material, together with some explanatory text, used during an oral briefing on the Nuclear Lunar Logistics System given at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, on 18 July 1963. The briefing and this document are intended to present the general status of the NERVA (Nuclear Engine for Rocket Vehicle Application) nuclear rocket development, the characteristics of certain operational NERVA-class engines, and appropriate technical and schedule information. Some of the information presented herein is preliminary in nature and will be subject to further verification, checking and analysis during the remainder of the study program. In addition, more detailed information will be prepared in many areas for inclusion in a final summary report. This work has been performed by REON, a division of Aerojet-General Corporation under Subcontract 74-10039 from the Lockheed Missiles and Space Company. The presentation and this document have been prepared in partial fulfillment of the provisions of the subcontract. From the inception of the NERVA program in July 1961, the stated emphasis has centered around the demonstration of the ability of a nuclear rocket to perform safely and reliably in the space environment, with the understanding that the assignment of a mission (or missions) would place undue emphasis on performance and operational flexibility. However, all were aware that the ultimate justification for the development program must lie in the application of the nuclear propulsion system to the national space objectives.

  2. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... real property. Real property shall be acquired in accordance with 48 CFR subpart 917.74. (d) Advance notice of proposed subcontract awards. Advance notice shall be provided in accordance with 48 CFR 970.... (i) Contractor-affiliated sources. Equipment, materials, supplies, or services from a contractor...

  3. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... real property. Real property shall be acquired in accordance with 48 CFR subpart 917.74. (d) Advance notice of proposed subcontract awards. Advance notice shall be provided in accordance with 48 CFR 970.... (i) Contractor-affiliated sources. Equipment, materials, supplies, or services from a contractor...

  4. Solar project cost report for Ingham County, Medical Care Facility, Okemos, Michigan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The solar energy system supplies service hot water for a 204 bed medical and geriatric care facility with laundry and kitchen. The system was designed at the time the building was designed. The 9,374 ft/sup 2/ of collectors were manufactured by Revere Copper and Brass, Inc., and are mounted at grade level behind the building. Solar heated water for use in heating service water is stored in a 5000 gallon hot water storage tank. The heaviest use of hot water occurs during the day so the requirement for thermal storage is modest. The construction costs of this solar project aremore » presented. Category costs are listed by materials, direct labor, ad subcontract costs. The subcontract costs include both materials, labor, overhead and profit for electrical, control and other minor subcontractors. The installed cost of the system was $312,825 not including prime contractor overhead and profit and general and administrative costs. (MHR)« less

  5. [Development of an Occupational Training Center for the Mentally Retarded.] Final Project Report.

    ERIC Educational Resources Information Center

    Hastbacka, Edwin A.

    The Occupational Training Center prepared mentally retarded young adults (over age 15, IQ range 30 to 70, average IQ 55) who were beyond regular schooling for competitive employment. The training program consisted of 60 to 90 mentally and multiply handicapped students per year (35 at a time) and used subcontracts from local businesses. The…

  6. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  7. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  8. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  9. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  10. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontract administration. 30.607 Section 30.607 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract...

  11. Solar electric thermal hydronic (SETH) product development project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickney, B.L.; Sindelar, A.

    Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and developmentmore » of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.« less

  12. 48 CFR 219.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business firms specifically identified in the subcontracting plan. Notifications shall be in writing and... SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business... business concerns shall include subcontracts with historically black colleges and universities and minority...

  13. 77 FR 9658 - General Services Administration Acquisition Regulation; Information Collection; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  14. 78 FR 59798 - Small Business Subcontracting: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 125 RIN 3245-AG22 Small Business Subcontracting: Correction AGENCY: U.S. Small Business Administration. ACTION: Correcting amendments. SUMMARY: This document... business subcontracting to implement provisions of the Small Business Jobs Act of 2010. This correction...

  15. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  16. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  17. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  18. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  19. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  20. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  1. 48 CFR 49.108 - Settlement of subcontract settlement proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement of subcontract settlement proposals. 49.108 Section 49.108 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108 Settlement of subcontract...

  2. 48 CFR 1519.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...

  3. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  4. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  5. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  6. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  7. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  8. Department of Defense Companies Participating in the Department of Defense Subcontracting Program. First Three Quarters Fiscal Year 1990

    DTIC Science & Technology

    1990-01-01

    This report presents a variety of subcontract data collected from Department of Defense (DOD) large business firms that have received at least one...award in excess of $500,000 ($1,000,000 for construction). Public Law 95-507 requires that these contractors establish a small business and small...disadvantaged business subcontracting program and report to DOD quarterly, using Standard Form 295, on subcontract awards made to these types of firms

  9. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  10. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  11. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  12. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  13. 48 CFR 970.1907-1 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...

  14. 77 FR 31016 - General Services Administration Acquisition Regulation; Submission for OMB Review; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  15. 13 CFR 126.701 - Can these subcontracting percentages requirements change?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Can these subcontracting percentages requirements change? 126.701 Section 126.701 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.701 Can these subcontracting percentages...

  16. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  17. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  18. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  19. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  20. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  1. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.009 Subcontracting research and development effort. Since the selection of R&D contractors is substantially based on... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontracting research...

  2. Development of vehicle magnetic air conditioner (VMAC) technology. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gschneidner, Karl A., Jr.; Pecharsky, V.K.; Jiles, David

    2001-08-28

    The objective of Phase I was to explore the feasibility of the development of a new solid state refrigeration technology - magnetic refrigeration - in order to reduce power consumption of a vehicle air conditioner by 30%. The feasibility study was performed at Iowa State University (ISU) together with Astronautics Corporation of America Technology Center (ACATC), Madison, WI, through a subcontract with ISU.

  3. 48 CFR 215.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontract pricing considerations. 215.404-3 Section 215.404-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contract Pricing 215.404-3 Subcontract pricing considerations. Follow the procedures at PGI 215.404-3 when...

  4. 76 FR 61626 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Parts 121 and 125 RIN 3245-AG22 Small Business Subcontracting AGENCY: U.S. Small Business Administration. ACTION: Proposed rule. SUMMARY: The U.S. Small Business... Business Jobs Act of 2010, which pertain to small business subcontracting. SBA is proposing to amend its...

  5. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  6. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  7. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  8. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  9. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  10. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  11. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  12. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  13. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  14. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  15. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  16. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  17. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  18. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  19. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  20. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  1. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  2. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  3. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  4. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  5. 48 CFR 31.204 - Application of principles and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-price subcontract with economic price adjustment provisions. (c) Costs incurred as payments under firm-fixed-price subcontracts or fixed-price subcontracts with economic price adjustment provisions or... captures the essential nature of, the cost at issue. [48 FR 42301, Sept. 19, 1983, as amended at 53 FR...

  6. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Small business... Clauses 52.219-9 Small business subcontracting plan. As prescribed in 19.708(b), insert the following clause: Small Business Subcontracting Plan (OCT 2010) (a) This clause does not apply to small business...

  7. 25 CFR 276.16 - Subgrants and subcontracts to non-profit organizations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Subgrants and subcontracts to non-profit organizations. 276.16 Section 276.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF... Subgrants and subcontracts to non-profit organizations. The uniform administrative requirements in this part...

  8. Companies Participating in the Department of Defense Subcontracting Program. First Quarter, Fiscal Year 1995.

    DTIC Science & Technology

    1995-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has a section for each of the...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and disadvantaged businesses. The

  9. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... hot cell services. 952.225-70 Section 952.225-70 Federal Acquisition Regulations System DEPARTMENT OF....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  10. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  11. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  12. 78 FR 17671 - Federal Acquisition Regulation; Submission for OMB Review; Summary Subcontract Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for... for DOD and NASA) of subcontracts awarded by prime and subcontractors for a specific Federal... data from Alaskan Native Corporations and Indian Tribe concerns under a subcontracting plan with the...

  13. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use...

  14. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  15. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  16. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  17. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  18. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  19. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  20. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  1. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  2. Hardware Development Process for Human Research Facility Applications

    NASA Technical Reports Server (NTRS)

    Bauer, Liz

    2000-01-01

    The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

  3. Wetland Biomass Production: emergent aquatic management options and evaluations. A final subcontract report. [Includes a bibliography containing 686 references on Typha from biological abstracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, D.C.; Dubbe, D.R.; Garver, E.G.

    1984-07-01

    The high yield potential and attractive chemical composition of Typha make it a particularly viable energy crop. The Minnesota research effort has demonstrated that total annual biomass yields equivalent to 30 dry tonnes/ha (13 tons/acre) are possible in planted stands. This compares with yields of total plant material between 9 and 16 dry tonnes/ha (4 to 7 tons/acre) in a typical Minnesota corn field. At least 50% of the Typha plant is comprised of a belowground rhizome system containing 40% starch and sugar. This high level of easily fermentable carbohydrate makes rhizomes an attractive feedstock for alcohol production. The abovegroundmore » portion of the plant is largely cellulose, and although it is not easily fermentable, it can be gasified or burned. This report is organized in a manner that focuses on the evaluation of the management options task. Results from stand management research performed at the University of Minnesota during 1982 and 1983 are integrated with findings from an extensive survey of relevant emergent aquatic plant research and utilization. These results and findings are then arranged in sections dealing with key steps and issues that need to be dealt with in the development of a managed emergent aquatic bio-energy system. A brief section evaluating the current status of rhizome harvesting is also included along with an indexed bibliography of the biology, ecology, and utilization of Typha which was completed with support from this SERI subcontract. 686 references, 11 figures, 17 tables.« less

  4. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  5. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  6. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  7. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  8. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  9. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  10. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  11. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  12. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  13. 48 CFR 212.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 212.504 Section 212.504 Federal... PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  14. Department of Defense Companies Participating in the Department of Defense Subcontracting Program, First Quarter Fiscal Year 1994

    DTIC Science & Technology

    1994-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has section for each of the Military...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and small disadvantaged businesses. The

  15. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  16. An Industrial-Based Consortium to Develop Premium Carbon Products from Coal, Annual Progress Report, October 1, 2005 through September 30, 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Bruce G

    2006-09-29

    Since 1998, The Pennsylvania State University has been successfully managing the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by Penn State, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350.more » This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes Penn State and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. Base funding for the selected projects is provided by NETL with matching funds from industry. At the annual funding meeting held in October 2003, ten projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten 2004 projects were completed during the previous annual reporting period and their final reports were submitted with the previous annual report (i.e., 10/01/04-09/30/05). The final report for the remaining project, which was submitted during this reporting period (i.e., 10/01/05-09/30/06), is attached. At the annual funding meeting held in November 2004, eleven projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2005. Three additional projects were selected for funding during the April 2005 tutorial/funding meeting. Subcontracts were let from Penn State to the subcontractors on July 1, 2005. Of these fourteen 2005 projects, eleven have been completed and the final reports are attached. An annual funding meeting was held in November 2005 and the council selected five projects for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2006, except for one that started October 1, 2006.« less

  17. 40 CFR 35.4240 - What provisions must my group's TAG contractor comply with if it subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false What provisions must my group's TAG contractor comply with if it subcontracts? 35.4240 Section 35.4240 Protection of Environment ENVIRONMENTAL... with if it subcontracts? A TAG contractor must comply with the following provisions when awarding...

  18. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  19. 22 CFR 228.37 - Nationality of employees under contracts or subcontracts for services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... subcontracts for services. 228.37 Section 228.37 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES ON SOURCE, ORIGIN AND NATIONALITY FOR COMMODITIES AND SERVICES FINANCED BY USAID Conditions Governing... contracts or subcontracts for services. (a) The rules set forth in §§ 228.31 through 228.36 do not apply to...

  20. 48 CFR 12.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 12.504 Section 12.504 Federal Acquisition... Applicability of Certain Laws to the Acquisition of Commercial Items and Commercially Available Off-The-Shelf Items 12.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  1. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  2. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  3. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  4. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  5. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  6. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  7. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  8. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  9. 2 CFR 801.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 801.220 Section 801.220 Grants and... DEBARMENT AND SUSPENSION Covered Transactions § 801.220 What contracts and subcontracts, in addition to...

  10. 42 CFR 434.6 - General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...

  11. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  12. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  13. 25 CFR 900.129 - How do the Secretary and Indian tribe or tribal organization arrive at an overall fair and...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... appropriate to the nature and phase of the work and sufficient to allow comparisons to the Indian tribe or... changes such as labor, material, and transportation costs. (c) The Secretary shall provide the initial... estimates based on changed or additional information such as the following: (1) Actual subcontract bids; (2...

  14. Special environmental control and life support equipment test analyses and hardware

    NASA Technical Reports Server (NTRS)

    Callahan, David M.

    1995-01-01

    This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

  15. Report on Contractual Flow Down Provisions in the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS)

    DTIC Science & Technology

    2017-11-01

    Richard Ginman, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts...publication, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts, http...FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts. Arlington, VA: National Defense Industrial Association NDIA), 2016. http

  16. 48 CFR 44.305-2 - Notification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approved. The system approval notification shall identify the class or classes of subcontracts requiring... has revealed sufficient weaknesses in a particular area of subcontracting to warrant special attention...

  17. 48 CFR 244.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent to Subcontracts 244.202-2 Considerations. (a) Where other than lowest price is the basis for subcontractor selection, has...

  18. Laboratory and Space Plasma Studies

    NASA Astrophysics Data System (ADS)

    Hyman, Ellis

    1996-08-01

    The work performed by Science Applications International Corporation (SAIC), encompasses a wide range of topics in experimental, computational, and analytical laboratory and space plasma physics. The accomplishments described in this report have been in support of the programs of the Laser Plasma Branch (Code 6730) and other segments of the Plasma Physics Division at the Naval Research Laboratory (NRL) and cover the period 27 September 1993 to August 1, 1996. SAIC's efforts have been supported by sub-contracts or consulting agreements with Pulse Sciences, Inc., Clark Richardson, and Biskup Consulting Engineers, Pharos Technical Enterprises, Plex Corporation, Cornell University, Stevens Institute of Technology, the University of Connecticut, Plasma Materials and Technologies, Inc., and GaSonics International, Inc. In the following discussions section we will describe each of the topics investigated and the results obtained. Much of the research work has resulted in journal publications and NRL Memorandum Reports in which the investigation is described in detail. These reports are included as Appendices to this Final Report.

  19. Safety Climate and Occupational Stress According to Occupational Accidents Experience and Employment Type in Shipbuilding Industry of Korea.

    PubMed

    Kim, Kyung Woo; Park, Sung Jin; Lim, Hae Sun; Cho, Hm Hak

    2017-09-01

    Safety climate and occupational stress are related with occupational accident. The present study tried to identify the differences in safety climate and occupational stress according to occupational accidents experience and employment type (e.g., direct workers and subcontract workers). In this study, we conducted a survey using safety climate scale and Korean Occupational Stress Scale and classified the participants into four groups: direct workers working for accident-free departments, direct workers working for accident departments, subcontract workers working for accident-free departments, and subcontract workers working for accident departments for 2 years within the same workplace in the shipbuilding industry. The direct workers and subcontract workers showed diverse results in subscales of safety climate and occupational stress. This result is supported by existing studies; however, further study is necessary for more supporting evidence and elaborative methodological approach. The necessity of management for safety climate and psychosocial factor such as occupational stress for both direct workers and subcontract workers as a whole is suggested by this study.

  20. 77 FR 14016 - General Services Administration Acquisition Regulation; Preparation, Submission, and Negotiation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ..., Submission, and Negotiation of Subcontracting Plans; Correction AGENCY: General Services Administration (GSA..., Preparation, Submission, and Negotiation of Subcontracting Plans; Correction. Correction In the information...

  1. 48 CFR 3019.705 - Responsibilities for the contracting officer under the subcontracting program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705...

  2. 48 CFR 19.701 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-based system for small business subcontracting program reporting. Failure to make a good faith effort to... planned subcontracting in support of the specific contract, except that indirect costs incurred for common...

  3. Update Direct-Strike Lightning Environment for Stockpile-to-Target Sequence: Supplement LLNL Subcontract #B568621 Lightning Protection at the Yucca Mountain Waste Storage Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uman, M A

    2008-10-09

    The University of Florida has surveyed all relevant publications reporting lightning damage to metals, metals which could be used as components of storage containers for nuclear waste materials. We show that even the most severe lightning could not penetrate the stainless steel thicknesses proposed for nuclear waste storage casks.

  4. 76 FR 33170 - Defense Federal Acquisition Regulation Supplement; Inclusion of Option Amounts in Limitations on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ...DoD is issuing this final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to implement section 826 of the National Defense Authorization Act for Fiscal Year 2011. Section 826 amended the DoD pilot program for transition to follow-on contracting after use of other transaction authority, to establish that the threshold limitation of $50 million for contracts and subcontracts under the program includes the dollar value of all options.

  5. SBA’s Progress in Implementing the Public Law 95-507 Subcontracting and Surety Bond Waiver Provisions has been Limited.

    DTIC Science & Technology

    1981-09-18

    IMP~mnl~~~U LayL 95-507 SubcontractjfQ fd Surety Bond Waiver Provisiolns 3as8en Limted. The Small Business Administration, working with a...Presidential Advisory Committee has no fll ipleetd the small business sub- L ~ 3 cowtractlgpoiin The committee has fo- cused on obtaining subcontracts from...GAO recommends changes SBA should make to nmimize subcontracting opportunities for small businesses . Also, GAO sugssthat the provision for 2 years

  6. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552..., historical performance and significant achievements in placing subcontracts for the same or similar products...

  7. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  8. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  9. Scientific Data Analysis and Software Support: Geodynamics

    NASA Technical Reports Server (NTRS)

    Klosko, Steven; Sanchez, B. (Technical Monitor)

    2000-01-01

    The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.

  10. 48 CFR 2019.705 - Responsibilities of the contracting officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System NUCLEAR REGULATORY COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705...

  11. 48 CFR 49.108-4 - Authorization for subcontract settlements without approval or ratification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-4 Authorization for subcontract settlements without approval or ratification. (a)(1) The...

  12. 48 CFR 970.4102-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE to acquire utility service(s) by subcontract, i.e., what the benefits are, such as economic..., shall be applied to a subcontract level acquisition for furnishing utility services to a facility owned...

  13. 48 CFR 319.705 - Responsibilities of the Contracting Officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 319.705...

  14. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  15. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  16. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.202...) Character and difficulty of subcontracting, including selection, placement, and management of subcontracts...

  17. 48 CFR 952.250-70 - Nuclear hazards indemnity agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... obligation under this contract and shall be unaffected by the death, disability, or termination of existence...) Inclusion in subcontracts. The Contractor shall insert this clause in any subcontract which may involve the...

  18. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  19. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  20. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  1. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  2. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  3. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  4. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  5. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  6. 14 CFR 1274.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Subcontracting dollar threshold. The dollar amount of the cooperative agreement subject to the small business subcontracting policies (includes small business, veteran-owned small business, service-disabled veteran-owned small business, historically underutilized small business, small disadvantaged business, women-owned...

  7. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... feasible units, as appropriate, to facilitate small business participation; (ii) Conducting market research... its subcontracting plan. (e) CMR Responsibilities. Commercial Market Representatives (CMRs) are SBA's... other resources and tools; (4) Counseling small business concerns on how to market themselves to large...

  8. 48 CFR 2944.202 - Contracting officer's evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contracting officer's evaluation. 2944.202 Section 2944.202 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent To Subcontract 2944.202 Contracting officer's...

  9. 48 CFR 44.202-1 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 44.202-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... notification and supporting data to ensure that the proposed subcontract is appropriate for the risks involved... during negotiations, the contracting officer shall identify those subcontracts in paragraph (j) of the...

  10. 13 CFR 121.410 - What are the size standards for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Size Eligibility Requirements for Government Procurement § 121.410 What are the size standards for SBA... Small Business Act, a concern is small for subcontracts which relate to Government procurements if it...

  11. Subcontracting Opportunities with DoD Major Prime Contractors

    DTIC Science & Technology

    1996-06-01

    The Department of Defense (DoD) offers two markets for small business and small disadvantaged business seeking defense contracting and defense...opportunities. The publication exclusively addresses the defense subcontracting opportunities market. The DoD encourages small business and small disadvantaged

  12. 48 CFR 44.301 - Objective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Objective. 44.301 Section... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.301 Objective. The objective of... which the contractor spends Government funds and complies with Government policy when subcontracting...

  13. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...

  14. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  15. 48 CFR 1419.705-2 - Determining the need for a subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Determining the need for a subcontracting plan. 1419.705-2 Section 1419.705-2 Federal Acquisition Regulations System DEPARTMENT OF THE... recommendations offered. ...

  16. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  17. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  18. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  19. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  20. NREL Photovoltaic Program FY 1995 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report summarizes the in-house and subcontracted R&D activities from Oct. 1994 through Sept. 1995; their objectives are to conduct basic, applied, and engineering research, manage subcontracted R&D projects, perform research complementary to subcontracted work, develop and maintain state-of-the-art measurement and device capabilities, develop PV manufacturing technology and modules, transfer results to industry, and evolve viable partnerships for PV systems and market development. The research activities are grouped into 5 sections: crystalline Si and advanced devices, thin-film PV, PV manufacturing, PV module and system performance and engineering, and PV applications and market development.

  1. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the best scientific and technological sources, it is important that the contractor not subcontract technical or scientific work without the contracting officer's advance knowledge. During the negotiation of a cost-reimbursement R&D contract, the contracting officer shall obtain complete information...

  2. 48 CFR 1652.244-70 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. 1652.244-70 Section 1652.244-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CLAUSES AND FORMS CONTRACT CLAUSES Texts of FEHBP Clauses...

  3. 42 CFR 422.202 - Participation procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... procedures. (a) Notice and appeal rights. An MA organization that operates a coordinated care plan or network... of groups of physicians, through reasonable procedures that include the following: (1) Written notice... guidelines. (c) Subcontracted groups. An MA organization that operates an MA plan through subcontracted...

  4. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  5. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  6. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  7. 76 FR 74749 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... amend its regulations to implement provisions of the Small Business Jobs Act of 2010 (Jobs Act... used in preparing its bid or proposal during contract performance. SBA also proposed to amend its... and evaluating small business subcontracting plan performance. SBA also proposed to clarify which...

  8. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 30.001...

  9. 48 CFR 2919.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...

  10. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS) rules and regulations for which a contractor or subcontractor— (1) Used one cost accounting practice to...

  11. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  12. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  13. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  14. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  15. Research on High-Bandgap Materials and Amorphous Silicon-Based Solar Cells, Final Technical Report, 15 May 1994-15 January 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schiff, E. A.; Gu, Q.; Jiang, L.

    1998-12-28

    This report describes work performed by Syracuse University under this subcontract. Researchers developed a technique based on electroabsorption measurements for obtaining quantitative estimates of the built-in potential Vbi in a-Si:H-based heterostructure solar cells incorporating microcrystalline or a-SiC:H p layers. Using this new electroabsorption technique, researchers confirmed previous estimates of Vbi {yields} 1.0 V in a-Si:H solar cells with ''conventional'' intrinsic layers and either microcrystalline or a-SiC:H p layers. Researchers also explored the recent claim that light-soaking of a-Si:H substantially changes the polarized electroabsorption associated with interband optical transitions (and hence, not defect transitions). Researchers confirmed measurements of improved (5') holemore » drift mobilities in some specially prepared a-Si:H samples. Disturbingly, solar cells made with such materials did not show improved efficiencies. Researchers significantly clarified the relationship of ambipolar diffusion-length measurements to hole drift mobilities in a-Si:H, and have shown that the photocapacitance measurements can be interpreted in terms of hole drift mobilities in amorphous silicon. They also completed a survey of thin BP:H and BPC:H films prepared by plasma deposition using phosphine, diborane, trimethylboron, and hydrogen as precursor gases.« less

  16. Final Results for the GRC Supporting Technology Development Project for the 110-Watt Stirling Radioisotope Generator (SRG110)

    NASA Technical Reports Server (NTRS)

    Schreiber, Jeffrey G.; Thieme, Lanny G.

    2007-01-01

    From 1999 to 2006, the NASA Glenn Research Center (GRC) supported the development of a high-efficiency, nominal 110-We Stirling Radioisotope Generator (SRG110) for potential use on NASA missions, including deep space missions, Mars rovers, and lunar applications. Lockheed Martin (LM) was the system integrator for the SRG110, under contract to the Department of Energy (DOE). Infinia Corporation (formerly Stirling Technology Company) developed the Stirling convertor, first as a contractor to DOE and then under subcontract to LM. The SRG110 development has been redirected, and recent program changes have been made to significantly increase the specific power of the generator. System development of an Advanced Stirling Radioisotope Generator (ASRG) has now begun, using a lightweight, advanced convertor from Sunpower, Inc. This paper summarizes the results of the supporting technology effort that GRC completed for the SRG110. GRC tasks included convertor extended-duration testing in air and thermal vacuum environments, heater head life assessment, materials studies, permanent magnet aging characterization, linear alternator evaluations, structural dynamics testing, electromagnetic interference (EMI) and electromagnetic compatibility (EMC) characterization, organic materials evaluations, reliability studies, and development of an end-to-end system dynamic model. Related efforts are now continuing in many of these areas to support ASRG development.

  17. Final Results for the GRC Supporting Technology Development Project for the 110-Watt Stirling Radioisotope Generator (SRG110)

    NASA Technical Reports Server (NTRS)

    Schreiber, Jeffrey G.; Thieme, Lanny G.

    2007-01-01

    From 1999-2006, the NASA Glenn Research Center (GRC) supported the development of a high-efficiency, nominal 110-We Stirling Radioisotope Generator (SRG110) for potential use on NASA missions, including deep space missions, Mars rovers, and lunar applications. Lockheed Martin (LM) was the system integrator for the SRG110, under contract to the Department of Energy (DOE). Infinia Corporation (formerly Stirling Technology Company) developed the Stirling convertor, first as a contractor to DOE and then under subcontract to LM. The SRG110 development has been redirected, and recent program changes have been made to significantly increase the specific power of the generator. System development of an Advanced Stirling Radioisotope Generator (ASRG) has now begun, using a lightweight, advanced convertor from Sunpower, Inc. This paper summarizes the results of the supporting technology effort that GRC completed for the SRG110. GRC tasks included convertor extended-duration testing in air and thermal vacuum environments, heater head life assessment, materials studies, permanent magnet aging characterization, linear alternator evaluations, structural dynamics testing, electromagnetic interference (EMI) and electromagnetic compatibility (EMC) characterization, organic materials evaluations, reliability studies, and development of an end-to-end system dynamic model. Related efforts are now continuing in many of these areas to support ASRG development.

  18. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  19. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  20. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  1. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  2. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  3. 48 CFR 1252.217-74 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracts. 1252.217-74 Section 1252.217-74 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CLAUSES AND FORMS...) Nothing contained in the contract shall be construed as creating any contractual relationship between any...

  4. 14 CFR § 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  5. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  6. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  7. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  8. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  9. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other resources and tools; (4) Counseling small business concerns on how to market themselves to large... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Subcontracting assistance. 125.3 Section 125.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION GOVERNMENT CONTRACTING PROGRAMS...

  10. 29 CFR 4.114 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Covered Contracts Generally § 4.114 Subcontracts. (a) “Contractor” as including “subcontractor... contractor undertakes a contract subject to the Act, the contractor agrees to assume the obligation that the...

  11. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  12. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  13. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  14. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  15. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  16. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  17. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  18. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  19. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  20. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  1. 48 CFR 49.108-7 - Government assistance in settling subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government assistance in settling subcontracts. 49.108-7 Section 49.108-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-7 Government assistance in...

  2. 48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 49.107 Section 49.107 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49...

  3. 48 CFR 12.500 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items and... law that are not applicable to— (1) Contracts for the acquisition of commercial items; (2) Subcontracts, at any tier, for the acquisition of commercial items; and (3) Contracts and subcontracts, at any...

  4. 77 FR 29983 - Federal Acquisition Regulation; Information Collection; Subcontract Consent

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... performance of functions of the Federal Acquisition Regulation (FAR), and whether it will have practical... The objective of consent to subcontract, as discussed in FAR Part 44, is to evaluate the efficiency and effectiveness with which the contractor spends Government funds, and complies with Government...

  5. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  6. 48 CFR 52.219-26 - Small Disadvantaged Business Participation Program-Incentive Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT CLAUSES Text of Provisions and Clauses 52.219-26 Small Disadvantaged Business Participation... the following: Small Disadvantaged Business Participation Program—Incentive Subcontracting (OCT 2000... its offer to try to award a certain amount to small disadvantaged business concerns in the North...

  7. 41 CFR 51-4.4 - Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Subcontracting. 51-4.4 Section 51-4.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... both with efficient performance in furnishing commodities or services under the JWOD Act and maximizing...

  8. 48 CFR 9.104-3 - Application of standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the... requires a subcontracting plan pursuant to Subpart 19.7, The Small Business Subcontracting Program, the... prospective contractor's responsibility. (d)(1) Small business concerns. Upon making a determination of...

  9. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  10. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  11. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  12. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  13. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  14. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  15. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  16. Apollo(R) Thin Film Process Development: Final Technical Report, April 1998 - April 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, D.W.

    2002-10-01

    BP Solar first started investigative work on CdTe photovoltaics in 1986. The module product name chosen for the CdTe devices is Apollo. The deposition method chosen was electrochemical deposition due to its simplicity and good control of stoichiometric composition. The window layer used is CdS, produced from a chemical-bath deposition. Initial work focused on increasing photovoltaic cell size from a few mm2 to 900 cm2. At BP Solar's Fairfield plant, work is focused on increasing semiconductor deposition to 1 m2. The primary objective of this subcontract is to establish the conditions required for the efficient plating of CdS/CdTe on large-area,more » transparent conducting tin-oxide-coated glass superstrate. The initial phase concentrates on superstrate sizes up to 0.55 m2. Later phases will include work on 0.94 m2 superstrates. The tasks in this subcontract have been split into four main categories: (1) CdS and CdTe film studies; (2) Enhanced laser processing; (3) Outdoor testing program for the Apollo module; and (4) Production waste abatement and closed loop study.« less

  17. An Analysis of Organizational and Funding Alternatives for the Armed Force Institute of Pathology

    DTIC Science & Technology

    2001-07-01

    operating cost includes costs for leased space but not the cost of major renovations or depreciation on government-owned facilities. As a result, it...the full costs of operations (labor, supplies and materials, overhead, depreciation , and subcontracts) and provide enough money to ensure replacement of... depreciation of assets), its design was too simple. Cus- tomers were charged a flat rate per item submitted for analysis. Although this does provide a

  18. Mesoscale Modeling of Kinetic Phase Behaviors in Mg-B-H (Subcontract Report)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, H.; Thornton, K.; Wood, B. C.

    Storage of hydrogen on board vehicles is one of the critical enabling technologies for creating hydrogenfueled transportation systems that can reduce oil dependency and mitigate the long-term effects of fossil fuels on climate change. Stakeholders in developing hydrogen infrastructure are currently focused on highpressure storage at 350 bar and 700 bar, in part because no viable solid-phase storage material has emerged. Nevertheless, solid-state materials, including high-density hydrides, remain of interest because of their unique potential to meet all DOE targets and deliver hydrogen at lower pressures and higher on-board densities. A successful solution would significantly reduce costs and ensure themore » economic viability of a U.S. hydrogen infrastructure. The Mg(BH 4) 2-MgB 2 system represents a highly promising solution because of its reasonable reaction enthalpy, high intrinsic capacity, and demonstrated reversibility, yet suffers from poor reaction kinetics. This subcontract aims to deliver a phase-field model for the kinetics of the evolution of the relevant phases within the Mg-B-H system during hydrogenation and dehydrogenation. This model will be used within a broader theory, synthesis, and characterization framework to study the properties of geometry-selected nanoparticles of pristine and doped MgB 2/Mg(BH 4) 2 with two aims: (1) understand the intrinsic limitations in (de)hydrogenation; (2) devise strategies for improving thermodynamics and kinetics through nanostructuring.« less

  19. 48 CFR 52.219-16 - Liquidated Damages-Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following clause: Liquidated Damages—Subcontracting Plan (JAN 1999) (a) Failure to make a good faith effort... has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have...

  20. 48 CFR 970.1907 - Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Business, Small Disadvantaged Business and Woman-Owned Small Business Concerns. 970.1907 Section 970.1907... MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907 Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

  1. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  2. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and subcontract incentives, fees, and profits associated with the increased or decreased costs to the... increase or decrease in contract and subcontracts incentives, fees, and profits associated with the... desirable and not detrimental to the Government and is, therefore, not subject to the no increased cost...

  3. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  4. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  5. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  6. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... economic development of resources in Burma. 537.410 Section 537.410 Money and Finance: Treasury Regulations... BURMESE SANCTIONS REGULATIONS Interpretations § 537.410 Contracts and subcontracts regarding economic... supervision and guarantee of another person's performance of a contract that includes the economic development...

  7. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  8. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  9. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  10. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  11. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  12. 48 CFR 49.108-8 - Assignment of rights under subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Assignment of rights under subcontracts. 49.108-8 Section 49.108-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-8 Assignment of rights under...

  13. 48 CFR 1449.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 1449.107 Section 1449.107 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1449...

  14. 48 CFR 44.400 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 44.400 Scope... required to apply to any subcontractors that are furnishing commercial items or commercial components in accordance with Section 8002(b)(2) of Public Law 103-355 and Section 826 of Public Law 110-181 (10 U.S.C...

  15. 48 CFR 252.219-7003 - Small business subcontracting plan (DoD contracts).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7003 Small business subcontracting plan (DoD contracts). As prescribed in 219.708(b)(1)(A), use the following clause: Small Business...

  16. 77 FR 44047 - Federal Acquisition Regulation; Reporting Executive Compensation and First-Tier Subcontract Awards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... Compensation B. Definitions C. Thresholds D. Paperwork Burden E. Applicability F. Subcontract Award Data G... definition of ``first- tier subcontractor.'' Comment: A number of respondents believed that executive... technologies and ideas, and increase the Government's costs by reducing competition. These respondents also...

  17. 77 FR 56709 - Proposed Information Collection (VA Subcontracting Report for Service Disabled Veteran-Owned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ..., Federal agencies are required to publish notice in the Federal Register concerning each proposed... response to the notice. This notice solicits comments on information needed to collect information from subcontractors to compare information obtained from subcontracting plans submitted by prime contractors in order...

  18. 25 CFR 900.136 - Do tribal employment rights ordinances apply to construction contracts and subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Do tribal employment rights ordinances apply to... OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER... rights ordinances apply to construction contracts and subcontracts? Yes. Tribal employment rights...

  19. 48 CFR 752.226-2 - Subcontracting with disadvantaged enterprises.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management and daily business are controlled by one or more such individuals. (2) Owned by socially and... disadvantaged enterprises. 752.226-2 Section 752.226-2 Federal Acquisition Regulations System AGENCY FOR... Clauses 752.226-2 Subcontracting with disadvantaged enterprises. As prescribed in 726.7007, insert the...

  20. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  1. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  2. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  3. 48 CFR 52.209-6 - Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Protecting the Government....209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. As prescribed in 9.409, insert the following clause: Protecting the...

  4. Research on polycrystalline thin film submodules based on CuInSe{sub 2} materials. Annual subcontract report, 11 November 1990--31 October 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Catalano, A.; Arya, R.; Carr, L.

    1992-05-01

    This report describes progress during the first year of a three-year research program to develop 12%-efficient CuInSe{sub 2} (CIS) submodules with area greater than 900 cm{sup 2}. To meet this objective, the program was divided into five tasks: (1) windows, contacts, substrates; (2) absorber material; (3) device structure; (4) submodule design and encapsulation; and (5) process optimization. In the first year of the program, work was concentrated on the first three tasks with an objective to demonstrate a 9%-efficient CIS solar cell. 7 refs.

  5. Archived Appendices | NREL

    Science.gov Websites

    subcontract or NREL Procurement. Appendix B-1 (07/11/14) Standard Terms and Conditions for (1) Cost Sharing , (2) Cost Reimbursement, and (3) Cost Plus Fixed Fee. Appendix B-2 (07/11/14) Standard Terms and Conditions for Cost Type Subcontracts with Educational Institutions Appendix B-10 (07/11/14) Standard Terms

  6. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  7. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  8. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  9. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  10. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  11. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  12. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  13. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  14. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  15. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  16. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  17. 13 CFR 121.411 - What are the size procedures for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the size procedures for SBA's Section 8(d) Subcontracting Program? 121.411 Section 121.411 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and Standards...

  18. 48 CFR 52.232-27 - Prompt payment for construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the... include such clauses in their subcontracts with each lower-tier subcontractor or supplier. (d) Subcontract... impair the right of the Contractor or a subcontractor at any tier to negotiate, and to include in their...

  19. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  20. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  1. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  2. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  3. Bureaucratic versus Craft Administration: The Relationship of Market Structure to the Construction Firm.

    ERIC Educational Resources Information Center

    Eccles, Robert G.

    1981-01-01

    Examines the factors that influence subcontracting and type of management in the construction industry. Argues that subcontracting is explained by a construction firm's size, complexity, and market extent, and that management type results from a firm's size and role in the production process and from census classification problems. (Author/RW)

  4. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  5. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  6. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  7. 48 CFR 19.707 - The Small Business Administration's role in carrying out the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... nature; and (4) Evaluate compliance with subcontracting plans, either on a contract-by-contract basis, or...

  8. 77 FR 70210 - Agency Information Collection (VA Subcontracting Report for Service Disabled Veteran-owned Small...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Subcontracting Report for Service Disabled Veteran-owned Small Business and Veteran-owned Small Business Concerns) Activities Under OMB Review AGENCY: Office of Small and Disadvantaged Business Utilization, Department of... U.S.C. 3501-3521), this notice announces that the Office of Small and Disadvantaged Business...

  9. 48 CFR 52.215-22 - Limitations on Pass-Through Charges-Identification of Subcontract Effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The offeror's proposal shall exclude excessive pass-through charges. (c) Performance of work by the..., under the contract, task order, or delivery order. (2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery...

  10. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  11. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  12. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  13. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  14. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  15. 48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...

  16. 13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...

  17. 48 CFR 13.005 - List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition threshold. 13.005 Section 13.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES...

  18. Minority On-Line Information Service (MOLIS): A minority research and education information service. Final report for Department of Energy Grant No. DE-FG02-90ER75602

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rodman, John A.

    MOLIS is an online database of minority institutions, and is used by federal agencies to identify peer reviewers and by majority institutions to identify possible collaborations and sub-contracts. MOLIS includes in-depth information about the research and educational capabilities of Historically Black Colleges and Universities (HBCUs), Hispanic Serving Institutions (HSIs), and Tribal Colleges. Included with this report are several annual progress reports, a list of all minority institutions currently on MOLIS, a list of outreach activities, etc.

  19. ALPHA SMP SYSTEM(S) Final Report CRADA No. TC-1404-97

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seager, M.; Beaudet, T.

    Within the scope of this subcontract, Digital Equipment Corporation (DIGITAL) and the University, through the Lawrence Livermore National Laboratory (LLNL), engaged in joint research and development activities of mutual interest and benefit. The primary objectives of these activities were, for LLNL to improve its capability to perform its mission, and for DIGITAL to develop technical capability complimentary to this mission. The collaborative activities had direct manpower investments by DIGITAL and LLNL. The project was divided into four areas of concern, which were handled concurrently. These areas included Gang Scheduling, Numerical Methods, Applications Development and Code Development Tools.

  20. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  1. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  2. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  3. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  4. Final Report for PV Incubator Subcontract No. NAT-0-99013-01: June 14, 2010 - March 2, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghosal, K.

    2012-04-01

    The goal of the subcontract is to scale up Semprius' novel micro-cell based modules to an annualized rate of 500 kW of receivers and 10 kW of modules, in support of the DOE 2020 Sunshot Initiative goals. The statement of work (SOW) was broken up into two Phases. Phase I was directed towards process development efforts towards addressing fundamental manufacturing metrics such as yield, die per wafer, automation and throughput. Phase II objectives are to scale to an annualized production rate of 500 kW of receivers and 10 kW of modules, while improving cell efficiency, module efficiency and transfer yield.more » Semprius has met all the technical milestones and deliverables for the contract. All subtasks were completed earlier than expected and the results exceeded the technical targets. In particular, 3J cell efficiency of 41.2% exceeded the target of 38%, module efficiency of 28.3% exceeded the target of 28% and transfer yield of 96.4% exceeds the target of 95%, with all tasks completed well ahead of schedule. Also, devices fabricated from 1st use GaAs substrates and substrates with two re-uses have been shown to be identical.« less

  5. NREL photovoltaic program FY 1997 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less

  6. 2 CFR 1326.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1326.220 Section 1326.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  7. 2 CFR 1200.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1200.220 Section 1200.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  8. Plastics processing: statistics, current practices, and evaluation.

    PubMed

    Cooke, F

    1993-11-01

    The health care industry uses a huge quantity of plastic materials each year. Much of the machinery currently used, or supplied, for plastics processing is unsuitable for use in a clean environment. In this article, the author outlines the reasons for the current situation and urges companies to re-examine their plastic-processing methods, whether performed in-house or subcontracted out. Some of the factors that should be considered when evaluating plastics-processing equipment are outlined to assist companies in remaining competitive and complying with impending EC regulations on clean room standards for manufacturing areas.

  9. Ultra high vacuum adhesion testing of NERVA engine materials

    NASA Technical Reports Server (NTRS)

    1970-01-01

    The primary objective of this research program was to determine the effects of surface cleaning and deliberate gaseous contamination on the adhesion behavior of selected candidate materials for use in the NERVA nuclear rocket engine program. Using a torsion balance technique, the relationship between the normal compressive load applied to crossed rod samples and the resultant contact resistance was used to ascertain the extent of adhesion under each set of experimental conditions. In addition to an evaluation of the static adhesion behavior of selected materials combinations, the experimental apparatus was modified to permit a similar investigation relating to the effects of specific tangential displacements of the sample wires, i.e., their sliding friction behavior. During the course of this subcontract, the materials combinations 440 C vs. 440 C. pyrographite vs ZTA graphite, Nbc (graphite) vs. Nbc (graphite), and Electrolize Inconel 718 vs. Au electroplated 302 S/S were evaluated.

  10. 2 CFR 1125.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1125.220 Section 1125.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  11. 2 CFR 1400.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1400.220 Section 1400.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  12. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... determine whether a Participant is small for a particular 8(a) BD subcontract? (a) Self certification by... agency. The Participant also must submit a copy of its offer, including its self-certification as to size... nonmanufacturer rule to, 8(a) BD procurements. (b) Verification of size by SBA. Within 30 days of its receipt of a...

  13. Under pressure, out of control, or home alone? Reviewing research and policy debates on the occupational health and safety effects of outsourcing and home-based work.

    PubMed

    Quinlan, Michael; Bohle, Philip

    2008-01-01

    The practice of outsourcing or subcontracting of work has grown rapidly in most countries over the past two decades. Outsourcing, de-institutionalization, and a range of other practices have also resulted in a growth of home-based work. Home-based workers, even when not part of a subcontracting process, operate in an isolated situation remote from their employer and other workers. Do such work arrangements expose workers to greater risk of injury, illness, or assault? The authors reviewed international studies of the occupational health and safety (OHS) effects of subcontracting and home-based work undertaken over the past 20 years. Of the 25 studies analyzed, 92 percent found poorer OHS outcomes. The studies were examined for clues about the reasons for these negative outcomes. The authors also identified similarities and differences between subcontracting and home-based work. Despite the evidence of poor OHS outcomes, research into outsourcing has stalled in recent years. With notable exceptions, governments have taken little account of findings on these work arrangements in their laws and policies, in part because neoliberal ideas dominate national and global policy agendas. The authors examine policy challenges and regulatory responses and make suggestions for future research and policy interventions.

  14. Poor Government Oversight of Anham and Its Subcontracting Procedures Allowed Questionable Costs To Go Undetected

    DTIC Science & Technology

    2011-07-30

    contractor purchasing system review of Anham. Management Comments and Audit Response The Defense Contract Mangement Agency and the U.S. Central... Introduction 1  Background 1  Government Agency Roles and Oversight Responsibilities 4  Objectives 7  Weak Government Oversight Resulted in Significant...Subcontracting Procedures Allowed Questionable Costs To Go Undetected SIGIR 11-022 July 30, 2011 Introduction Since 2003, the United States Government

  15. Multidisciplinary Design Investigation of Truss-Braced Wing Aircraft. Phase 4

    NASA Technical Reports Server (NTRS)

    Grossman, B.; Kapania, R. K.; Mason, W. H.; Schetz, J. A.

    2000-01-01

    The subject grant was in effect from 7/l/99 to 10/31/99. The objective of this grant was to complete a strut-braced wing study which began, which was in effect from 6/27/96 until 9/15/99. While the initial grant was on-going, we were also under subcontract to Lockheed-Martin, Aerospace Systems Division, Marietta, GA to do additional studies related to the strut-braced wing grant "A Structural and Aerodynamic Investigation of a Strut-Braced Wing Transonic Aircraft Concept", 4/l/98-11/15/98. Lockheed-Martin was under contract to NASA Langley. Finally the research under this grant has led to a joint proposal from NASA Langley, Locheed-Martin, Virginia Tech and NASA Dryden to develop a transonic strut-braced wing demonstration aircraft in response to Flight Research for Revolutionary Aeronautical Concepts (REVCON). This final report summarizes the research done, augmented by the additional concommitant research projects mentioned above.

  16. Improving Building Construction Specifications in State and Local Governments

    NASA Technical Reports Server (NTRS)

    1980-01-01

    State and local governments can benefit from master specifications systems that centralize data on all types of building materials, products, and processes. Most of these systems are organized according to the MASTERFORMAT system, which, along with guide specifications that require the insertion or deletion of standardized information, resulted from the specific needs of users and providers. For jurisdictions preparing their own specifications, staff time and cost are reduced. For those subcontracting the preparation, master specifications provide a means of evaluating the specifications submitted. Current management specification systems described include SPECINTACT, OMSPEC, MASTERPEC, and the NAVFAC, Corps of Engineers, and GSA guide specifications.

  17. ASRM test report: Autoclave cure process development

    NASA Technical Reports Server (NTRS)

    Nachbar, D. L.; Mitchell, Suzanne

    1992-01-01

    ASRM insulated segments will be autoclave cured following insulation pre-form installation and strip wind operations. Following competitive bidding, Aerojet ASRM Division (AAD) Purchase Order 100142 was awarded to American Fuel Cell and Coated Fabrics Company, Inc. (Amfuel), Magnolia, AR, for subcontracted insulation autoclave cure process development. Autoclave cure process development test requirements were included in Task 3 of TM05514, Manufacturing Process Development Specification for Integrated Insulation Characterization and Stripwind Process Development. The test objective was to establish autoclave cure process parameters for ASRM insulated segments. Six tasks were completed to: (1) evaluate cure parameters that control acceptable vulcanization of ASRM Kevlar-filled EPDM insulation material; (2) identify first and second order impact parameters on the autoclave cure process; and (3) evaluate insulation material flow-out characteristics to support pre-form configuration design.

  18. Center for Multiscale Plasma Dynamics: Report on Activities (UCLA/MIT), 2009-2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Troy Carter

    2011-04-18

    The final 'phaseout' year of the CMPD ended July 2010; a no cost extension was requested until May 2011 in order to enable the MIT subcontract funds to be fully utilized. Research progress over this time included verification and validation activities for the BOUT and BOUT++ code, studies of spontaneous reconnection in the VTF facility at MIT, and studies of the interaction between Alfven waves and drift waves in LAPD. The CMPD also hosted the 6th plasma physics winter school in 2010 (jointly with the NSF frontier center the Center for Magnetic Self-Organization, significant funding came from NSF for thismore » most recent iteration of the Winter School).« less

  19. CESA-1 receiver design review. Phase 1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-07-01

    The Central Electrica Solar de Almeria CESA-1 is a 1.0 MWe water/steam solar central receiver electric power plant being built by the Spanish in Almeria, Spain. Centro de Estudios de la Energia (CEE) is responsible for the management, design, and construction of the project. At the request of the Solar Energy Research Institute and with the approval of the Department of Energy, Sandia National Laboratories, Livermore is providing technical assistance in areas unique to solar applications to CEE. At the request of CEE, Sandia contracted with Foster Wheeler Development Corporation (FWDC) to critically review and evaluate the CESA-1 receiver design.more » Foster Wheeler Iberia (FWI) was subcontracted to FWDC to coordinate efforts with CEE in Madrid. The FWDC program which was started on July 9, 1979, was subdivided into three tasks: (1) design basis review: critical review of the receiver design specifications and requirements; (2) design review and analyses: critical review of thermal/hydraulic, structural, and materials aspects of the receiver design and the design and analysis procedures used by the designer in critical areas of the design; and (3) operational review: critical review of receiver instrumentation and controls and the operational and safety aspects of the receiver. Results of the design review and evaluation are presented. (WHK)« less

  20. Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development. volume 3; Program Cost estimates

    NASA Technical Reports Server (NTRS)

    McCurry, J. B.

    1995-01-01

    The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

  1. Statement of Work Third Party Algorithm Development and Evaluation of Detection of Liquid Explosives in Dual-Energy Digital Radiographic/TIP Ready X-ray Images - Public Version

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nekoogar, F; Martz, Jr., H E

    2009-09-23

    The purpose of this statement of work is for third party collaborators to train, validate and have Lawrence Livermore National Security, LLC (LLNS) evaluate algorithms to detect liquid threats in digital radiography (DR)/TIP Ready X-ray (TRX) images that will be provided by LLNS through the Transportation and Security Administration (TSA). LLNS will provide a set of images with threat(s) to determine detection rates and non-threat images from airports to determine false alarm rates. A key including a bounding box showing the locations of the threats and non-threats will be provided for the images. It is expected that the Subcontractor shallmore » use half of the images with their keys for training the algorithms and the other half shall be used for validation (third party evaluation) purposes. The Subcontractor shall not use the key to the second half of the data other than for the validation and reporting of the performance of its algorithm (not for training). The Subcontractor has 45 business days from the receipt of datasets and the Subcontract to: (1) Run their detection/classification algorithms on the data; (2) Deliver a final report describing their performance by generating Receiver Operator Characteristic (ROC) curves using their algorithm; and (3) Deliver a copy of the third party's executable software (already trained and validated by the datasets) to LLNL accompanied by a user manual. LLNS will evaluate the performance of the same algorithm on another separate set of data. LLNS evaluation of the Subcontractor's algorithm will be documented in a final report within 30 days of receiving the executable code. This report will be sent to TSA and the report may be disseminated to the Subcontract at TSA's discretion.« less

  2. High-throughput manufacturing of thin-film CdS/CdTe photovoltaic modules. Annual subcontract report, 16 November 1994--15 November 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D.W.

    1997-02-01

    The objectives of this subcontract are to advance Solar Cells, Inc.`s (SCI`s) photovoltaic manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. Activities during the second year of the program concentrated on process development, equipment design and testing, quality assurance, and ES and H programs. These efforts broadly addressed the issues of the manufacturing process for producing thin-film monolithic CdS/CdTe photovoltaic modules.

  3. Basic and applied research program. Semiannual report, July-December 1978

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butler, B.L.

    1979-12-01

    The status of research projects in the Basic and Applied Research Program at SERI is presented for the semiannual period ending December 31, 1978. The five tasks in this program are grouped into Materials Research and Development, Materials Processing and Development, Photoconversion Research, Exploratory Research, and Energy Resource and Assessment and have been carried out by personnel in the Materials, Bio/Chemical Conversion, and Energy Resource and Assessment Branches. Subtask elements in the task areas include coatings and films, polymers, metallurgy and corrosion, optical materials, surfaces and interfaces in materials research and development; photochemistry, photoelectrochemistry, and photobiology in photoconversion; thin glassmore » mirror development, silver degradation of mirrors, hail resistance of thin glass, thin glass manufacturing, cellular glass development, and sorption by desiccants in materials processing and development; and thermoelectric energy conversion, desiccant cooling, photothermal degradation, and amorphous materials in exploratory research. For each task or subtask element, the overview, scope, goals, approach, apparatus and equipment, and supporting subcontracts are presented, as applicable, in addition to the status of the projects in each task or subtask. Listing of publications and reports authored by personnel associated with the Basic and Applied Research Program and prepared or published during 1978 are also included.« less

  4. Center for Multiscale Plasma Dynamics: Report on Activities (UCLA/MIT), 2009-2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, Troy Alan

    2014-10-03

    The final “phaseout” year of the CMPD ended July 2010; a no cost extension was requested until May 2011 in order to enable the MIT subcontract funds to be fully utilized. Research progress over this time included verification and validation activities for the BOUT and BOUT++ code, studies of spontaneous reconnection in the VTF facility at MIT, and studies of the interaction between Alfv´en waves and drift waves in LAPD. The CMPD also hosted the 6th plasma physics winter school in 2010 (jointly with the NSF frontier center the Center for Magnetic Self-Organization, significant funding came from NSF for thismore » most recent iteration of theWinter School).« less

  5. Monitoring the Hazards of Silicic Volcanoes with Remote Sensing

    NASA Technical Reports Server (NTRS)

    Fink, Jonathan; Wessels, Rick; Eisinger, Chris; Ramsey, Michael; Hellman, Melanie; Kuhn, Sally

    2004-01-01

    This report details the final progress on the Solid Earth and Natural Hazards project: Monitoring of Hazards of Silicic Volcanoes with Remote Sensing (SENH99-0000-0159). The original award went to Arizona State University (ASU) with Dr. Jonathan Fink as the P.I. and Dr. Michael Ramsey as the Co-I. In May 2000, Dr. Ramsey left ASU to take a tenure-track faculty position at the University of Pittsburgh. The principle investigators and NASA Headquarters agreed to split the grant award at the HQ level and therefore avoid the double overhead charges that would arise from a university subcontract. The objectives of the science were divided, and coordinated yearly progress reports have been submitted from each University. This report details the final progress on work carried out at Arizona State. A report by Dr. Ramsey at the University of Pittsburgh has already been submitted. The work from both institutions is closely related and this report will reflect that connection.

  6. Effects of acceleration rate on Rayleigh-Taylor instability in elastic-plastic materials

    NASA Astrophysics Data System (ADS)

    Banerjee, Arindam; Polavarapu, Rinosh

    2016-11-01

    The effect of acceleration rate in the elastic-plastic transition stage of Rayleigh-Taylor instability in an accelerated non-Newtonian material is investigated experimentally using a rotating wheel experiment. A non-Newtonian material (mayonnaise) was accelerated at different rates by varying the angular acceleration of a rotating wheel and growth patterns of single mode perturbations with different combinations of amplitude and wavelength were analyzed. Experiments were run at two different acceleration rates to compare with experiments presented in prior years at APS DFD meetings and the peak amplitude responses are captured using a high-speed camera. Similar to the instability acceleration, the elastic-plastic transition acceleration is found to be increasing with increase in acceleration rate for a given amplitude and wavelength. The experimental results will be compared to various analytical strength models and prior experimental studies using Newtonian fluids. Authors acknowledge funding support from Los Alamos National Lab subcontract(370333) and DOE-SSAA Grant (DE-NA0001975).

  7. Finite plate thickness effects on the Rayleigh-Taylor instability in elastic-plastic materials

    NASA Astrophysics Data System (ADS)

    Polavarapu, Rinosh; Banerjee, Arindam

    2017-11-01

    The majority of theoretical studies have tackled the Rayleigh-Taylor instability (RTI) problem in solids using an infinitely thick plate. Recent theoretical studies by Piriz et al. (PRE 95, 053108, 2017) have explored finite thickness effects. We seek to validate this recent theoretical estimate experimentally using our rotating wheel RTI experiment in an accelerated elastic-plastic material. The test section consists of a container filled with air and mayonnaise (a non-Newtonian emulsion) with an initial perturbation between two materials. The plate thickness effects are studied by varying the depth of the soft-solid. A set of experiments is run by employing different initial conditions with different container dimensions. Additionally, the effect of acceleration rate (driving pressure rise time) on the instability threshold with reference to the finite thickness will also be inspected. Furthermore, the experimental results are compared to the analytical strength models related to finite thickness effects on RTI. Authors acknowledge financial support from DOE-SSAA Grant # DE-NA0003195 and LANL subcontract #370333.

  8. Final Report for''Numerical Methods and Studies of High-Speed Reactive and Non-Reactive Flows''

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwendeman, D W

    2002-11-20

    The work carried out under this subcontract involved the development and use of an adaptive numerical method for the accurate calculation of high-speed reactive flows on overlapping grids. The flow is modeled by the reactive Euler equations with an assumed equation of state and with various reaction rate models. A numerical method has been developed to solve the nonlinear hyperbolic partial differential equations in the model. The method uses an unsplit, shock-capturing scheme, and uses a Godunov-type scheme to compute fluxes and a Runge-Kutta error control scheme to compute the source term modeling the chemical reactions. An adaptive mesh refinementmore » (AMR) scheme has been implemented in order to locally increase grid resolution. The numerical method uses composite overlapping grids to handle complex flow geometries. The code is part of the ''Overture-OverBlown'' framework of object-oriented codes [1, 2], and the development has occurred in close collaboration with Bill Henshaw and David Brown, and other members of the Overture team within CASC. During the period of this subcontract, a number of tasks were accomplished, including: (1) an extension of the numerical method to handle ''ignition and grow'' reaction models and a JWL equations of state; (2) an improvement in the efficiency of the AMR scheme and the error estimator; (3) an addition of a scheme of numerical dissipation designed to suppress numerical oscillations/instabilities near expanding detonations and along grid overlaps; and (4) an exploration of the evolution to detonation in an annulus and of detonation failure in an expanding channel.« less

  9. Growth and Characterization of GaN As(P) for High Efficiency Solar Cells: Final Subcontract Report, 29 July 1999--28 September 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Narayanamurti, V.

    2004-06-01

    This report describes the characterization of GaAs1-xNx and GaP1-xNx alloys using scanning tunneling microscopy (STM) and ballistic electron emission microscopy (BEEM). One objective was to understand the origins of the giant bandgap bowing of these compound semiconductor alloys as a function of nitrogen concentration. The STM and BEEM have been used to characterize GaNxAs1-x and GaNxP1-x as a function of composition. The reduction in bandgap has been measured. Detailed studies of the band structure as a function of N composition has led to a basic understanding of the materials system. The major results of this work include: (i) determination ofmore » relative contributions of the G- and L-like bands of GaNxAs1-x to the BEEM spectra; (ii) determination of the composition dependence of the Au/ G- and L-like bands of GaNxAs1-x Schottky barrier height; (iii) development of a model to describe the BEEM results at nonepitaxial metal/semiconductor interfaces; and (iv) ballistic electron emission spectroscopy studies of GaNxP1-x samples that demonstrated possible splitting in the degeneracy of the X valley due to the nitrogen. The data were qualitatively described by the recent perturbed host states model of Kent and Zunger.« less

  10. High throughput manufacturing of thin-film CdTe photovoltaic modules. Annual subcontract report, 16 November 1993--15 November 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D W

    1995-11-01

    This report describes work performed by Solar Cells, Inc. (SCI), under a 3-year subcontract to advance SCI`s PV manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. SCI will meet these objectives in three phases by designing, debugging, and operating a 20-MW/year, automated, continuous PV manufacturing line that produces 60-cm {times} 120-cm thin-film CdTe PV modules. This report describes tasks completed under Phase 1 of the US Department of Energy`s PV Manufacturing Technology program.

  11. The Department of the Navy Subcontracting Program Update

    DTIC Science & Technology

    2014-08-01

    calculaCon  of  single  FY   acCvity  at  the  contract  level   Tot   Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014   Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0

  12. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  13. Science Innovation Through Industry Partnership: Lessons from AMPERE in Bridging the Federal Sponsor/Private Corporation Divide

    NASA Astrophysics Data System (ADS)

    Anderson, B. J.; Korth, H.; Erlandson, R. E.

    2017-12-01

    The Active Magnetosphere and Planetary Electrodynamics Response Experiment (AMPERE) was made possible by harnessing an fortuitous capability of the Iridium Communications constellation of 70 polar orbiting satellites. In 1996 it was realized that the attitude magnetometers on-board the Iridium satellites, then in fabrication, could potentially be used to obtain the first ever global and continuous measurements of the Birkeland currents with a sufficiently short re-sampling cadence (10 minutes) to track the dynamic evolution of the large-scale currents. The experience of taking this idea from 1996 through various research grant supported efforts, mission of opportunity proposal attempts, and finally through funding and implementation as a National Science Foundation geospace facility, revealed a number of challenges both in proposing innovative solutions to existing sponsor programs and also in working between the federal sponsor community and the private commercial space environment. Implementing AMPERE required a code change to on-board software on the Iridium satellites and it proved necessary to engage NASA to adjust the solicitation language to allow AMPERE. For NASA proposals we also encountered a conflict with respect to federal sponsorship such that the original business configuration of Iridium could not accept the accounting regime implied by a sub-contract derived from a federal contract acquisition. Subsequent mission of opportunity efforts encountered various other challenges including the cancellation of an explorer to fund the exploration initiative in 2001. The facilities proposal to NSF was almost not submitted owing a funding vehicle disparity between the preferred proposer structure (contract) vs NSF's requirement to fund only grants and a final hurdle concerned the structure of the contract with Iridium which was initially a sub-contract but was changed to a fixed-price data purchase due to NSF's limitations on funding fee-bearing engineering services. More general differences in the federal procurement timeline versus the corporate decision making timeline were also encountered. These lessons in the industry/federal partnership for innovative science are discussed as they may offer guidance for future efforts.

  14. Goldman - Georgetown University | Division of Cancer Prevention

    Cancer.gov

    Principal Investigator: Radoslav (Rado) Goldman, PhDInstitution: Georgetown University, Washington, DC Subcontract Principal Investigator: Raja Mazumder, PhDInstitution: George Washington University |

  15. Methods for forming thin-film heterojunction solar cells from I-III-VI.sub. 2

    DOEpatents

    Mickelsen, Reid A.; Chen, Wen S.

    1982-01-01

    An improved thin-film, large area solar cell, and methods for forming the same, having a relatively high light-to-electrical energy conversion efficiency and characterized in that the cell comprises a p-n type heterojunction formed of: (i) a first semiconductor layer comprising a photovoltaic active material selected from the class of I-III-VI.sub.2 chalcopyrite ternary materials which is vacuum deposited in a thin "composition-graded" layer ranging from on the order of about 2.5 microns to about 5.0 microns (.congruent.2.5.mu.m to .congruent.5.0.mu.m) and wherein the lower region of the photovoltaic active material preferably comprises a low resistivity region of p-type semiconductor material having a superimposed region of relatively high resistivity, transient n-type semiconductor material defining a transient p-n homojunction; and (ii), a second semiconductor layer comprising a low resistivity n-type semiconductor material; wherein interdiffusion (a) between the elemental constituents of the two discrete juxtaposed regions of the first semiconductor layer defining a transient p-n homojunction layer, and (b) between the transient n-type material in the first semiconductor layer and the second n-type semiconductor layer, causes the transient n-type material in The Government has rights in this invention pursuant to Contract No. EG-77-C-01-4042, Subcontract No. XJ-9-8021-1 awarded by the U.S. Department of Energy.

  16. Two cases of methyl alcohol intoxication by sub-chronic inhalation and dermal exposure during aluminum CNC cutting in a small-sized subcontracted factory.

    PubMed

    Ryu, Jia; Lim, Key Hwan; Ryu, Dong-Ryeol; Lee, Hyang Woon; Yun, Ji Young; Kim, Seoung-Wook; Kim, Ji-Hoon; Jung-Choi, Kyunghee; Kim, Hyunjoo

    2016-01-01

    Methyl alcohol poisoning has been mainly reported in community. Two cases of methyl alcohol poisoning occurred in a small-sized subcontracted factory which manufactured smartphone parts in Korea. One young female patient presented with dyspnea and visual disturbance. Another young male patient presented with visual disturbance and myalgia. They treated with sodium bicarbonate infusion and hemodialysis for metabolic acidosis. In addition, he received ethyl alcohol per oral treatment. Her and his urinary methyl alcohol concentration was detected as 7.632 mg/L, 46.8 mg/L, respectively, although they were treated hemodialysis. Results of the working environment measurement showed that the concentration of methyl alcohol (1030.1-2220.5 ppm) in the air exceeded the time weighted average (200 ppm). They were diagnosed with optic neuropathy due to methyl alcohol poisoning and still have visual impairment. Workers who hired as dispatched employees in a small-sized subcontracted factory were exposed to high concentrations of methyl alcohol. The workplace had poor ventilation system. In addition, workers did not wear proper personal protect equipment. Working environment measurement and annual chekups for workers were not performed. They were in a blind spot to occupational safety and health. More attention is needed to protect vulnerable workers' health.

  17. How to make an affiliate model work--a case history.

    PubMed

    Baumgartner, A J; Berns, A; Stedman, T W

    1984-01-01

    The North Shore Community Mental Health Center has an unusual mental health delivery system. "Out-stationed" staff work in affiliated agencies, yet are employees of the NSCMHC. This service configuration is the result of an arduous planning process which weighed the advantages of several organizational models. On one extreme was a "Centralized" model, wherein one organization was solely responsible for delivering mental health services. On the other extreme was an "Umbrella" model, wherein the organization acted as a fiscal conduit to several service providers. Somewhere in the middle a compromise was found with a "Lead Agency" model. Here, an organization provides the administrative structure, provides some services, and subcontracts the remaining services. The North Shore Community Mental Health Center adapted this system one step further. Rather than subcontracting services, it outstationed CMHC staff to affiliate agencies. United Cerebral Palsy Association of the North Shore is one of the CMHC's affiliates. The service need for family and play therapists resulted in two CMHC therapists being outstationed at UCP. The affiliation agreement between the two organizations specify the responsibilities and roles each have. The hiring process between the two organizations is an example of the duality of the system. Both agencies had interviewing roles, yet the final hiring decision was the affiliate's, since the employee would spend the majority of his/her time outstationed at the affiliate side. Outstationed staff integration to the North Shore Community Mental Health Center presented problems, however. Since these were new staff hired with federal funds, and since their visibility at the Center was minimal, they had some difficulty being identified as Center staff by existing employees.(ABSTRACT TRUNCATED AT 250 WORDS)

  18. Loop-mediated isothermal amplification method for diagnosing Pneumocystis pneumonia in HIV-uninfected immunocompromised patients with pulmonary infiltrates.

    PubMed

    Nakashima, Kei; Aoshima, Masahiro; Ohkuni, Yoshihiro; Hoshino, Eri; Hashimoto, Kohei; Otsuka, Yoshihito

    2014-12-01

    Loop-mediated isothermal amplification (LAMP) is becoming an established nucleic acid amplification method offering rapid, accurate, and cost-effective diagnosis of infectious diseases. We retrospectively evaluated 78 consecutive HIV-uninfected patients who underwent LAMP method for diagnosing Pneumocystis pneumonia (PCP). Diagnosis of PCP was made by the detection of Pneumocystis jirovecii (P. jirovecii) with positive LAMP or conventional staining (CS) (Grocott methenamine silver staining or Diff-Quick™) on the basis of compatible clinical symptoms and radiologic findings. Additionally, we reviewed HIV-uninfected immunocompromised patients who underwent subcontract PCR as a historical control. LAMP was positive in 10 (90.9%) of 11 positive-CS patients. Among 13 negative-CS patients with positive LAMP, 11 (84.6%) had PCP, and the remaining 2 were categorized as having P. jirovecii colonization. LDH levels in negative-CS PCP were higher than in positive-CS PCP (p = 0.026). (1 → 3)-β-D-glucan levels in negative-CS PCP were lower than in positive-CS PCP (p = 0.011). The interval from symptom onset to diagnosis as PCP in LAMP group (3.45 ± 1.77 days; n = 22) was shorter than in subcontract PCR group (6.90 ± 2.28 days; n = 10; p < 0.001). As for patients without PCP, duration of unnecessary PCP treatment in LAMP group (2; 2-3 days; n = 10) was shorter than in subcontract PCR group (7; 7-12.25 days; n = 6; p = 0.003). LAMP showed higher sensitivity (95.4%) and positive predictive value (91.3%) than subcontract PCR did. Pneumocystis LAMP method is a sensitive and cost-effective diagnostic method and is easy to administer in general hospitals. In-house LAMP method would realize early diagnosis of PCP, resulting in improving PCP prognosis and reducing unnecessary PCP-specific treatment. Copyright © 2014 Japanese Society of Chemotherapy and The Japanese Association for Infectious Diseases. Published by Elsevier Ltd. All rights reserved.

  19. Improved self-contained breathing apparatus concept. Final report Oct 80-Jun 82

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, L.; Walker, J.

    1982-08-01

    Past operational experiences of USAF fire fighting and rescue teams have indicated the need for an improved self-contained breathing apparatus (SCBA). In October 1980, a contract was awarded to Electronic Data Systems, Panama City, Florida, to design and develop a prototype SCBA that would meet Air Force technical requirements. A prototype was designed, developed, and tested through a subcontract with Reimers Consultants, Falls Church, Virginia. This report describes the technical requirements, a detailed technical description of the unit, and the unmanned test procedures and results. The unmanned testing demonstrate that the prototype SCBA meets all performance requirements, except for weight.more » The fully charged prototype weights 34 pounds, the maximum acceptable weight is 30 pounds. With the other performance requirements either met or exceeded, manned testing of the SCBA can proceed.« less

  20. Thin-film photovoltaic partnership -- Apollo{reg{underscore}sign} thin film process development: Phase 1 Technical Report, May 1998--April 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, D.W.; Skinner, D.E.

    1999-10-26

    The objective of this Phase 1 subcontract was to establish an efficient production plating system capable of depositing thin-film CdTe and CdS on substrates up to 0.55 m{sup 2}. This baseline would then be used to build on and extend deposition areas to 0.94 m{sup 2} in the next two phases. The following achievements have been demonstrated: {sm{underscore}bullet} Chemical-bath deposition of CdS and electrochemical deposition of CdTe was demonstrated on 0.55 m{sup 2} substrates. The films were characterized using optical and electrical techniques, to increase the understanding of the materials and aid in loss analysis. {sm{underscore}bullet} A stand-alone, prototype CdTemore » reaction tank was built and commissioned, allowing the BP Solar team to perform full-scale trials as part of this subcontract. {sm{underscore}bullet} BP Solar installed two outdoor systems for reliability and performance testing. {sm{underscore}bullet} The 2-kW, ground-mounted, grid-connected system contains seventy-two 0.43-m{sup 2} Apollo{reg{underscore}sign} module interconnects. {sm{underscore}bullet} Two modules have been supplied to NREL for evaluation on their Performance and Energy Rating Test bed (PERT) for kWh evaluation. {sm{underscore}bullet} BP Solar further characterized the process waste stream with the aim to close-loop the system. Currently, various pieces of equipment are being investigated for suitability of particle and total organic compound removal.« less

  1. Methods for forming thin-film heterojunction solar cells from I-III-VI.sub. 2

    DOEpatents

    Mickelsen, Reid A [Bellevue, WA; Chen, Wen S [Seattle, WA

    1985-08-13

    An improved thin-film, large area solar cell, and methods for forming the same, having a relatively high light-to-electrical energy conversion efficiency and characterized in that the cell comprises a p-n type heterojunction formed of: (i) a first semiconductor layer comprising a photovoltaic active material selected from the class of I-III-VI.sub.2 chalcopyrite ternary materials which is vacuum deposited in a thin "composition-graded" layer ranging from on the order ot about 2.5 microns to about 5.0 microns (.congruent.2.5 .mu.m to .congruent.5.0 .mu.m) and wherein the lower region of the photovoltaic active material preferably comprises a low resistivity region of p-type semiconductor material having a superimposed region of relatively high resistivity, transient n-type semiconductor material defining a transient p-n homojunction; and (ii), a second semiconductor layer comprising a low resistivity n-type semiconductor material; wherein interdiffusion (a) between the elemental constituents of the two discrete juxtaposed regions of the first semiconductor layer defining a transient p-n homojunction layer, and (b) between the transient n-type material in the first semiconductor layer and the second n-type semiconductor layer, causes the The Government has rights in this invention pursuant to Contract No. EG-77-C-01-4042, Subcontract No. XJ-9-8021-1 awarded by the U.S. Department of Energy.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saccomanno, G.

    ''Early Lung Cancer Detection in Uranium Miners with Abnormal Sputum Cytology'' was funded by the Department of Energy to monitor the health effects of radon exposure and/or cigarette smoke on uranium workers from the Colorado Plateau. The resulting Saccomanno Uranium Workers Archive and data base has been used as a source of information to prove eligibility for compensation under the Radiation Exposure Compensation Act and as the source of primary data tissue for a subcontract and other collaborations with outside investigators. The latter includes a study of radon exposure and lung cancer risk in a non-smoking cohort of uranium minersmore » (subcontract); a study of genetic markers for lung cancer susceptibility; and a study of {sup 210}Pb accumulation in the skull as a biomarker of radon exposure.« less

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holley, W A

    This report describes work performed under a subcontract to the National Renewable Energy Laboratory under the Photovoltaic Manufacturing Technology Project. The objectives of this subcontract are to (1) define the problem of yellowing/browning of EVA-based encapsulants; (2) determine probable mechanisms and the role of various parameters such as heat, UV exposure, module construction, EVA interfaces, and EVA thickness, in the browning of EVA-based encapsulants; (3) develop stabilization strategies for various module constructions to protect the encapsulant from degradative failure; (4) conduct laboratory, accelerated outdoor, and field testing of encapsulant, laminated test coupons, and full modules to demonstrate the functional adequacymore » of the stabilization strategies; and (5) implement these strategies. This report summarizes the accomplishments related to the above goals for the reporting period.« less

  4. Mobil Solar Energy Corporation thin EFG octagons. Final subcontract report, 1 April 1992--31 January 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalejs, J.P.

    1994-06-01

    Mobil Solar Energy Corporation manufactures photovoltaic modules based on its unique Edge-defined Film-fed Growth (EFG) process for producing octagon-shaped hollow polycrystalline silicon tubes. The octagons are cut by lasers into 100 mm x 100 mm wafers which are suitable for solar cell processing. This process avoids slicing, grinding and polishing operations which are wasteful of material and are typical of most other wafer production methods. EFG wafers are fabricated into solar cells and modules using processes that have been specially developed to allow scaling up to high throughput rates. The goals of the Photovoltaic Manufacturing Technology Initiative (PVMaT) program atmore » Mobil Solar were to improve the EFG manufacturing line through technology advances that accelerate cost reduction in production and stimulate market growth for its product. The program was structured into three main tasks: to decrease silicon utilization by lowering wafer thickness from 400 to 200 {mu}m; to enhance laser cutting yields and throughput while improving the wafer strength; and to raise crystal growth productivity and yield. The technical problems faced and the advances made in the Mobil Solar PVMaT program are described. The author concludes with a presentation of the results of a detailed cost model for EFT module production. This model describes the accelerated reductions in manufacturing costs which are already in place and the future benefits anticipated to result from the technical achievements of the PVMaT program.« less

  5. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...

  6. 48 CFR 44.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... purchasing system or performance is inadequate; (2) Close working relationships or ownership affiliations... subcontracting with small, veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged and women...

  7. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  8. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  9. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  10. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  11. 75 FR 33269 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Procurement List: Product Wooden Trunk Locker NSN: 8460-00-243-3234. NPA: Employment Source, Inc... competitor enjoying a profitable subcontract forever if the commercial portion of the trunk locker...

  12. 40 CFR 35.938-9 - Subcontracts under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...

  13. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  14. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  15. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  16. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  17. 48 CFR 3019.705-1 - General support for the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705-1 General support for the program. In any...

  18. Low-Activity Waste Pretreatment System Additional Engineering-Scale Integrated Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landon, Matt R.; Wilson, Robert A.

    Washington River Protections Solutions, LLC’s (WRPS) Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low-activity waste (ILAW) by feeding LAW directly from Tank Farms to the Waste Treatment and Immobilization Plant (WTP) LAW Facility, bypassing the WTP Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria (WAC). Full-scale and engineering-scale testing of critical technology elements, as part of the technology maturation process, are components of the overall LAWPS Project. WRPS awarded themore » engineering-scale integrated testing scope to AECOM via WRPS Subcontract 58349. This report is deliverable MSR-008 of the subcontract.« less

  19. Opto-mechanical support services. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This subcontract was for Optomec`c support of the Los Alamos National Laboratory`s (LANL`s) Group MEE-12 in the technical specialty area of opto-mechanical design, engineering and fabrication. Two individual tasks were defined by MEE-12 and completed by Optomec personnel. Edward J. Yavornik acted as Principal Investigator on the Wire and Fluorescent Fiber Offset Grid (WAFFOG) for the Neutral Particle Beam (NPB) GTA (Ground Test Accelerator) Experiment, and Thomas Swann acted as Principal Investigator on the ESS-7 Photometers Project. Some hardware was procured/fabricated for the ESS-7 Photometer task, however, most of the work consisted of design and engineering support resulting in drawingsmore » and specifications which were prepared by MEE-12 personnel. There were no technical papers or patents generated by Optomec personnel as a result of this work, and all work defined in the contract was completed.« less

  20. Final Data Report: P- and S-Wave Velocity Logging Borings C4993, C4996, and C4997 Part A: Interval Logs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steller, Robert; Diehl, John

    2007-02-01

    Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohaymore » serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.« less

  1. Final Data Report: P- and S-Wave Velocity Logging Borings C4993, C4996, and C4997 Part B: Overall Logs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diehl, John; Steller, Robert

    2007-03-20

    Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohaymore » serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.« less

  2. Integrated Dynamic Gloabal Modeling of Land Use, Energy and Economic Growth

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atul Jain, University of Illinois, Urbana-Champaign, IL

    2009-10-14

    The overall objective of this collaborative project is to integrate an existing general equilibrium energy-economic growth model with a biogeochemical cycles and biophysical models in order to more fully explore the potential contribution of land use-related activities to future emissions scenarios. Land cover and land use change activities, including deforestation, afforestation, and agriculture management, are important source of not only CO2, but also non-CO2 GHGs. Therefore, contribution of land-use emissions to total emissions of GHGs is important, and consequently their future trends are relevant to the estimation of climate change and its mitigation. This final report covers the full projectmore » period of the award, beginning May 2006, which includes a sub-contract to Brown University later transferred to the National Center for Atmospheric Research (NCAR) when Co-PI Brian O'Neill changed institutional affiliations.« less

  3. PWR steam generator chemical cleaning, Phase I. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rothstein, S.

    1978-07-01

    United Nuclear Industries (UNI) entered into a subcontract with Consolidated Edison Company of New York (Con Ed) on August 8, 1977, for the purpose of developing methods to chemically clean the secondary side tube to tube support crevices of the steam generators of Indian Point Nos. 1 and 2 PWR plants. This document represents the first reporting on activities performed for Phase I of this effort. Specifically, this report contains the results of a literature search performed by UNI for the purpose of determining state-of-the-art chemical solvents and methods for decontaminating nuclear reactor steam generators. The results of the searchmore » sought to accomplish two objectives: (1) identify solvents beyond those proposed at present by UNI and Con Ed for the test program, and (2) confirm the appropriateness of solvents and methods of decontamination currently in use by UNI.« less

  4. Low-cost manufacturing of the point focus concentrating module and its key component, the Fresnel lens. Final subcontract report, 31 January 1991--6 May 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saifee, T.; Konnerth, A. III

    1991-11-01

    Solar Kinetics, Inc. (SKI) has been developing point-focus concentrating PV modules since 1986. SKI is currently in position to manufacture between 200 to 600 kilowatts annually of the current design by a combination of manual and semi-automated methods. This report reviews the current status of module manufacture and specifies the required approach to achieve a high-volume manufacturing capability and low cost. The approach taken will include process development concurrent with module design for automated manufacturing. The current effort reviews the major manufacturing costs and identifies components and processes whose improvements would produce the greatest effect on manufacturability and cost reduction.more » The Fresnel lens is one such key component. Investigating specific alternative manufacturing methods and sources has substantially reduced the lens costs and has exceeded the DOE cost-reduction goals. 15 refs.« less

  5. Rutgers University Subcontract B611610 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soundarajan, Sucheta; Eliassi-Rad, Tina; Gallagher, Brian

    Given an incomplete (i.e., partially-observed) network, which nodes should we actively probe in order to achieve the highest accuracy for a given network feature? For example, consider a cyber-network administrator who observes only a portion of the network at time t and wants to accurately identify the most important (e.g., highest PageRank) nodes in the complete network. She has a limited budget for probing the network. Of all the nodes she has observed, which should she probe in order to most accurately identify the important nodes? We propose a novel and scalable algorithm, MaxOutProbe, and evaluate it w.r.t. four networkmore » features (largest connected component, PageRank, core-periphery, and community detection), five network sampling strategies, and seven network datasets from different domains. Across a range of conditions, MaxOutProbe demonstrates consistently high performance relative to several baseline strategies« less

  6. Bioengineering aspects of inorganic carbon supply to mass algal cultures. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldman, J.C.

    1980-06-01

    The work included in this report is part of an ongoing study (currently funded by the Solar Energy Research Institute - Subcontract No. XR-9-8144-1) on the inorganic carbon requirements of microalgae under mass culture conditions and covers the period June 1, 1978 through May 31, 1979. It is divided into two parts appended herein. The first part is a literature review on the inorganic carbon chemical system in relation to algal growth requirements, and the second part deals with the kinetics of inorganic carbon-limited growth of two freshwater chlorophytes including the effect of carbon limitation on cellular chemical composition. Additionalmore » experiment research covered under this contract was reported in the Proceedings of the 3rd Annual Biomass Energy Systems Conferences, pp. 25-32, Bioengineering aspects of inorganic carbon supply to mass algal cultures. Report No. SERI/TP-33-285.« less

  7. 48 CFR 22.1603 - Exceptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or subcontracts for work performed exclusively outside the United States. (b) Exemptions granted by... ability of the Government to procure goods and services on an economical and efficient basis or if special...

  8. 48 CFR 15.401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.401 Definitions. As used in this subpart— Price means cost plus any fee or profit applicable to the contract type. Subcontract (except as...

  9. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  10. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  11. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  12. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  13. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  14. 42 CFR 480.120 - Information subject to disclosure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts under those contracts (except for proprietary or business information); (3) Copies of documents..., including a study design and methodology. (b) Aggregate statistical information that does not implicitly or...

  15. Industrial Fuel Gas Demonstration Plant Program. Bid packages for materials (Deliverable No. 28)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-01-01

    Fixed-price supply type bid packages for materials and/or service essentially are comprised of two parts, namely: (1) a technical requisition of the material, equipment, or service to be supplied; and (2) commercial and legal requirements, normally referred to as terms and conditions. Requisitions, providing technical requirements, for all equipment items identified for the Industrial Fuel Gas Demonstration Plant may be found in the 12 volumes of the Demonstration Plant Mechanical Design. The requisitions have been included within separate sections of the design report, sorted by appropriate plant unit. Combined with any General Notes Requisition and the necessary FWEC Job Standards,more » these various item requisitions provide all technical information for the prospective vendor to furnish his bid. The terms and conditions (boiler plate) to be included in the bid package identify all the contractual requirements which will be imposed upon the bidder. These requirements cover the conditions he must meet to bid on the particular item as well as the clauses to be included within the eventual purchase order/subcontract. A typical package of such terms and conditions is included.« less

  16. 48 CFR 919.7011 - Developmental assistance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Engineering and other technical assistance; (3) Noncompetitive award of subcontracts under DOE or other... activities; (5) Progress payments based on costs; (6) Rent-free use of facilities and/or equipment owned or...

  17. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  18. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  19. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  20. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  1. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  2. 24 CFR 882.412 - Subcontracting of owner services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR... HUD approval, rents which exceed the appropriate Moderate Rehabilitation Fair Market Rent for a unit...

  3. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  4. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  5. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  6. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  7. 49 CFR 22.11 - Eligibility criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business with experience in the transportation industry and trade for which the STLP loan is sought; (5) Be...-executed transportation-related contract, subcontract, or purchase order held directly with DOT or with...

  8. A New Front in the Sweatshop Wars?

    ERIC Educational Resources Information Center

    Farrell, Elizabeth F.; Olsen, Florence

    2001-01-01

    Discusses how some prominent institutions prompt debate by subcontracting the labor-intensive work of putting documents online to vendors in developing countries. Libraries counter that contractors treat overseas employees well. (EV)

  9. 48 CFR 47.504 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., such as agricultural and food-aid shipments; (2) Shipments covered under 46 U.S.C. Appx 1241-1, such as those generated by Export-Import Bank loans or guarantees; (3) Subcontracts under— (i) Government...

  10. Strontium-90 Error Discovered in Subcontract Laboratory Spreadsheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. D. Brown A. S. Nagel

    1999-07-31

    West Valley Demonstration Project health physicists and environment scientists discovered a series of errors in a subcontractor's spreadsheet being used to reduce data as part of their strontium-90 analytical process.

  11. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  12. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  13. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  14. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... contract); (3) Apprentices and Trainees; (4) Payrolls and Basic Records; (5) Compliance with Copeland Act...

  15. International Business Machines (IBM) Corporation Interim Agreement EPA Case No. 08-0113-00

    EPA Pesticide Factsheets

    On March 27, 2008, the United States Environmental Protection Agency (EPA), suspended International Business Machines (IBM) from receiving Federal Contracts, approved subcontracts, assistance, loans and other benefits.

  16. 48 CFR 226.370-8 - Goals and incentives for subcontracting with HBCU/MIs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Historically Black Colleges and Universities and Minority Institutions 226.370-8 Goals and incentives for... educational institutions. (b) The contracting officer may, when contracting by negotiation, use in...

  17. 78 FR 42391 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... for the Jobs Act was the belief that contracting officers and prime contractors are not reporting or... for making false claims. SBA notes that the requirements that apply in the construction arena do not...

  18. Upcoming Purchasing and Subcontracting Opportunities | NREL

    Science.gov Websites

    Services Fall 2022 Construction@nrel.gov Design-Build and Construction Spring 2018 Construction@nrel.gov Design-Build for Minor Construction Spring 2020 Construction@nrel.gov Testing of Fuel and Oil Samples

  19. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  20. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  1. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... which the apparently successful offeror received an evaluation credit for proposing one or more SDB... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  2. 36 CFR 14.9 - Terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... employees of the contractors, and to indemnify the United States against any liability for damages to life..., or national origin and shall require an identical provision to be included in all subcontracts. (l...

  3. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... immediately. In doing so, the contractor shall explain the proposed method of solving the problem or shall... problems and the installation of lines and equipment as contemplated by the contract documents while...

  4. 48 CFR 227.7102-3 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... processes. Do not require the contractor to include this clause in its subcontracts. (2) Use the clause at... for commercial items or commercial components. (c) Use the clause at 252.227-7037, Validation of...

  5. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to complete all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the second quarter (1/1/2013 to 3/31/2013), all the technical and legal documents for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. The revised CRADA documents were sent to DOE, Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for completing legal documents for the project. A non-disclosure agreement was revised and sent to all the parties for reviews.« less

  6. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.« less

  7. Building NYX [Engineering Materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours company that was without parallel in the shipyard's history. The work, designated the NYX Project'' for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them converted frommore » the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less

  8. Building NYX [Engineering Materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-12-31

    From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours & company that was without parallel in the shipyard`s history. The work, designated the ``NYX Project`` for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them convertedmore » from the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less

  9. Field studies of beach cones as coastal erosion control/reversal devices for areas with significant oil and gas activities. Final report, February 24, 1992--September 18, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Law, V.J.

    1995-09-18

    The primary objective of this project was to evaluate the utility of a device called the {open_quotes}beach cone{close_quotes} in combating coastal erosion. Seven initial sites were selected for testing beach cones in a variety of geometric configurations. Permits were obtained from the State of Louisiana and the U.S. Army Corps of Engineers to perform the work associated with this study. Six hundred beach cones were actually installed at six of the sites in late July and early August, 1992. Findings indicate that beach cones accreted significant amounts of materials along the beach of a barrier island, and they might havemore » been instrumental in repairing an approximately 200 meter gap in the island. At the eighth installation the amount of accreted material was measured by surveys to be 2200 cubic meters (2900 cubic yards) in February of 1993, when the cones were found to have been completely covered by the material. At other test sites, accretion rates have been less dramatic but importantly, no significant additional erosion has occurred, which is a positive result. The cost of sediment accretion using beach cones was found to be about $13.72 per cubic yard, which would be much lower if the cones were mass produced (on the order of $3.00 per cubic yard). The survival of the cones through the fringes of Hurricane Andrew indicates that they can be anchored sufficiently to survive significant storms. The measurements of the cones settling rates indicate that this effect is not significant enough to hinder their effectiveness. A subcontract to Xavier University to assess the ecological quality of the experimental sites involved the study of the biogeochemical cycle of trace metals. The highest concentration of heavy metals were near a fishing camp while the lowest levels were in the beach sand of a barrier island. This suggests that the metals do not occur naturally in these areas, but have been placed in the sediments by man`s activities.« less

  10. Steam Turbine Materials for Ultrasupercritical Coal Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Viswanathan, R.; Hawk, J.; Schwant, R.

    The Ultrasupercritical (USC) Steam Turbine Materials Development Program is sponsored and funded by the U.S. Department of Energy and the Ohio Coal Development Office, through grants to Energy Industries of Ohio (EIO), a non-profit organization contracted to manage and direct the project. The program is co-funded by the General Electric Company, Alstom Power, Siemens Power Generation (formerly Siemens Westinghouse), and the Electric Power Research Institute, each organization having subcontracted with EIO and contributing teams of personnel to perform the requisite research. The program is focused on identifying, evaluating, and qualifying advanced alloys for utilization in coal-fired power plants that needmore » to withstand steam turbine operating conditions up to 760°C (1400°F) and 35 MPa (5000 psi). For these conditions, components exposed to the highest temperatures and stresses will need to be constructed from nickel-based alloys with higher elevated temperature strength than the highchromium ferritic steels currently used in today's high-temperature steam turbines. In addition to the strength requirements, these alloys must also be weldable and resistant to environmental effects such as steam oxidation and solid particle erosion. In the present project, candidate materials with the required creep strength at desired temperatures have been identified. Coatings that can resist oxidation and solid particle erosion have also been identified. The ability to perform dissimilar welds between nickel base alloys and ferritic steels have been demonstrated, and the properties of the welds have been evaluated. Results of this three-year study that was completed in 2009 are described in this final report. Additional work is being planned and will commence in 2009. The specific objectives of the future studies will include conducting more detailed evaluations of the weld-ability, mechanical properties and repair-ability of the selected candidate alloys for rotors, casings and valves, and to perform scale-up studies to establish a design basis for commercial scale components. A supplemental program funded by the Ohio Coal Development Office will undertake supporting tasks such as testing and trials using existing atmospheric, vacuum and developmental pressure furnaces to define specific metal casting techniques needed for producing commercial scale components.« less

  11. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  12. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  13. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  14. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  15. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  16. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  17. 48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123...

  18. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  19. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  20. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  1. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  2. 48 CFR 252.225-7046 - Exports by Approved Community Members in Response to the Solicitation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... all applicable International Traffic in Arms Regulations (ITAR) requirements, including any criminal.../Title of Duly Authorized RepresentativeDate (h) Subcontracts. The offeror shall flow down the substance...

  3. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  4. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  5. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  6. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-2... production of an item or process begun as a prototype project under an other transaction agreement or as a...

  7. 48 CFR 819.7101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7101 Purpose. The VA Mentor-Protégé Program is... businesses (VOSBs) in enhancing their capabilities to perform contracts and subcontracts for VA. The Mentor...

  8. 48 CFR 2944.302 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...

  9. 48 CFR 2944.302 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...

  10. 48 CFR 2944.302 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...

  11. Illinois Institute of Technology Report: IITB52 Antifoamer for Alternative Salt Processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, D.P.

    2001-06-27

    The attached report is a summary of the work performed by Dr. Darsh Wasan, Dr. Alex Nikolov, and their researchers at the Illinois Institute of Technology (IIT) during FY01. IIT developed the IITB52 antifoam for SRTC in FY00 to minimize the foam produced during precipitation, washing and concentration of cesium and potassium tetraphenyl borate precipitate. The IITB52 antifoam has been very successful during continuous processing (prototypical of plant operation). However, there were several key issues where SRTC needed the experience and knowledge of IIT to resolve. As a result a subcontract was set up with Dr. Wasan and Dr. Alexmore » Nikolov during FY01. This subcontract requested IIT to perform the basic research necessary to understand the foaming mechanism and explain the effectiveness of the IITB52 antifoam agent in the Small Tank Tetraphenylborate Process (STTP).« less

  12. The nexus between OSH and subcontracting.

    PubMed

    Nunes, Isabel L

    2012-01-01

    Subcontracting of specialized functions to external companies (e.g. cleaning or maintenance) is actually very common within several industries. These external companies' are called contractors and their contracting is often designated as outsourcing. Frequently contractors involve other companies (the sub-contractors) to assist them in fulfilling the contract, resulting in a complex chain of organizations focused on interchange of work - the contracting chain. Therefore in the same work site can coexist workers form the client-company and workers from the contractors and/or subcontractors. Since contractors perform their job in client's facilities, they can be exposed to hazards that are unknown to them. On other hand, workers of the client company can also be exposed to hazardous situations derived from the work performed by the contractors. The paper discusses how adequate occupational safety and health conditions can be assured when dealing with this kind of dynamic labor networks. Two case-studies and several examples coming from international literature will be presented.

  13. Management of optics. [for HEAO-2 X ray telescope

    NASA Technical Reports Server (NTRS)

    Kirchner, T. E.; Russell, M.

    1981-01-01

    American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

  14. Who is working while sick? Nonstandard employment and its association with absenteeism and presenteeism in South Korea.

    PubMed

    Kim, Ja Young; Lee, Joohee; Muntaner, Carles; Kim, Seung-Sup

    2016-10-01

    This study sought to examine whether nonstandard employment is associated with presenteeism as well as absenteeism among full-time employees in South Korea. We analyzed a cross-sectional survey of 26,611 full-time employees from the third wave of the Korean Working Conditions Survey in 2011. Experience of absenteeism and presenteeism during the past 12 months was assessed through self-reports. Employment condition was classified into six categories based on two contract types (parent firm and subcontract) and three contract durations [permanent (≥1 year, no fixed term), long term (≥1 year, fixed term), and short term (<1 year, fixed term)]. We found opposite trends between the association of nonstandard employment with absenteeism and presenteeism after adjusting for covariates. Compared to parent firm-permanent employment, which has been often regarded as a standard employment, absenteeism was not associated or negatively associated with all nonstandard employment conditions except parent firm-long term employment (OR 1.88; 95 % CI 1.57, 2.26). However, presenteeism was positively associated with parent firm-long term (OR 1.64; 95 % CI 1.42, 1.91), subcontract-long term (OR 1.61; 95 % CI 1.12, 2.32), and subcontract-short term (OR 1.26; 95 % CI 1.02, 1.56) employment. Our results found that most nonstandard employment may increase risk of presenteeism, but not absenteeism. These results suggest that previous findings about the protective effects of nonstandard employment on absenteeism may be explained by nonstandard workers being forced to work when sick.

  15. Subcontractors and increased risk for work-related diseases and absenteeism.

    PubMed

    Min, Kyoung B; Park, Shin G; Song, Jae S; Yi, Kwan H; Jang, Tae W; Min, Jin Y

    2013-11-01

    Despite increasing reliance on subcontracting in many economic sectors, there is little information available on occupational health and safety issues among subcontractor employees. The purpose of this study was to investigate the effect of subcontracting on self-reported health problems and absences due to occupational accidents and sickness using a nationally representative sample from South Korea. The data used were sampled from the second wave of the Korean Working Conditions Survey [2010]. Information on 3,282 parent firm employees and 728 subcontractor employees was obtained. For the logistic regression model, the outcomes were work-related health problems and absenteeism. The independent variables were personal and occupational characteristics, job aspects, and working hazards. Subcontractor employees were significantly more likely to experience health problems than the employee at parent firms. In particular, subcontractors' risk of injuries and anxiety/depression increased twofold (odd ratios, OR=2.01, 95% confidence interval, CIs, 1.24-3.26) and threefold (OR=2.95, 95% CIs 1.52-5.73), respectively, after controlling for potential variables. In addition, subcontractor employees were three times more likely than employees at parent firms to miss work due to illness (OR=3.56; 95% CIs 2.02-6.26). Working conditions, especially those related to job aspects and workplace exposures, attenuated these risks. Subcontracting workers were found to have a higher risk of work-related diseases and a higher absenteeism rate than parent firm workers. Our study highlights the need to protect and improve the occupational health and safety of subcontractor employees. Copyright © 2013 Wiley Periodicals, Inc.

  16. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  17. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  18. 48 CFR 44.302 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Requirements. 44.302 Section 44.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.302 Requirements. (a) The ACO...

  19. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  20. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

Top