Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge
2015-09-01
With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.
Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction
NASA Astrophysics Data System (ADS)
Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad
2018-03-01
In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.
VanderKnyff, Jeremy; Friedman, Daniela B; Tanner, Andrea
2015-01-01
Using a sample of YouTube videos posted on the YouTube channels of organ procurement organizations, a content analysis was conducted to identify the frames used to strategically communicate prodonation messages. A total of 377 videos were coded for general characteristics, format, speaker characteristics, organs discussed, structure, problem definition, and treatment. Principal components analysis identified message frames, and k-means cluster analysis established distinct groupings of videos on the basis of the strength of their relationship to message frames. Analysis of these frames and clusters found that organ procurement organizations present multiple, and sometimes competing, video types and message frames on YouTube. This study serves as important formative research that will inform future studies to measure the effectiveness of the distinct message frames and clusters identified.
Ajayi, Saheed O; Oyedele, Lukumon O
2018-05-01
Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.
DOT National Transportation Integrated Search
2007-09-01
Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...
29 CFR 95.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Cost and price analysis. 95.45 Section 95.45 Labor Office of... Procurement Standards § 95.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...
49 CFR 19.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Cost and price analysis. 19.45 Section 19.45... Requirements Procurement Standards § 19.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price...
2014-01-01
Background Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. Methods ARV drug procurement from private sector sources for the years 2004–2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil’s national treatment guidelines. Results Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Conclusions Drug procurement and expenditures for ARVs in Brazil varied between 2004–2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing. PMID:24735589
Luo, Jing; Oliveira, Maria A; Ramos, Mariana B C; Maia, Aurélio; Osorio-de-Castro, Claudia G S
2014-04-16
Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. ARV drug procurement from private sector sources for the years 2004-2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil's national treatment guidelines. Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Drug procurement and expenditures for ARVs in Brazil varied between 2004-2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing.
Sequential improvements in organ procurement increase the organ donation rate.
Billeter, Adrian T; Sklare, Seth; Franklin, Glen A; Wright, Jerry; Morgan, Gary; O'Flynn, Paul E; Polk, Hiram C
2012-11-01
Organ demand exceeds availability of transplantable organs. Organ procurement continues to suffer from failures to identify potential donors, inability to obtain consent for donation, as well as failures to retrieve certain organs as donor demographics change. The purpose of this article is to propose how sequentially introduced measures can increase organ donation rates as well as improve organ procurement. We analysed the effect of stepwise improvements in the organ procurement process patients in a university-based surgical intensive care unit over a 20-year period. We related newly introduced measures in the organ retrieval process with changes in donation rates. We specifically targeted these three main steps in the donation process: donor identification, conversion of potential donors to actual donors, and organ protection during the procurement process. Finally, we assessed the effect of the same measures on organ procurement after introduction in other hospitals of the same organ procurement region. Introduction of quality improvement steps increased all of the observed parameters. The number of organ donors was stabilised due to a better identification of potential donors, a major increase in conversion from potential to actual donors, and an increase in extended criteria donor. Improvements in organ protection led to higher rates of organs transplanted per donor and increased recovery of lungs and hearts despite increasing donor age. The same measures were introduced successfully in other hospitals in our organ procurement region. Sequential improvements in organ procurement can increase the yield of retrieved organs. The same measures can be applied to other hospitals and lead to comparable improvements in organ donation. Published by Elsevier Ltd.
Procurement performance measurement system in the health care industry.
Kumar, Arun; Ozdamar, Linet; Ng, Chai Peng
2005-01-01
The rising operating cost of providing healthcare is of concern to health care providers. As such, measurement of procurement performance will enable competitive advantage and provide a framework for continuous improvement. The objective of this paper is to develop a procurement performance measurement system. The paper reviews the existing literature in procurement performance measurement to identify the key areas of purchasing performance. By studying the three components in the supply chain collectively with the resources, procedures and output, a model is been developed. Additionally, a balanced scorecard is proposed by establishing a set of generic measures and six perspectives. A case study conducted at the Singapore Hospital applies the conceptual model to describe the purchasing department and the activities within and outside the department. The results indicate that the material management department has already made a good start in measuring the procurement process through the implementation of the balanced scorecard. There are many data that are collected but not properly collated and utilized. Areas lacking measurement include cycle time of delivery, order processing time, effectiveness, efficiency and reliability. Though a lot of hard work was involved, the advantages of establishing a measurement system outweigh the costs and efforts involved in its implementation. Results of balanced scorecard measurements provide decision-makers with critical information on efficiency and effectiveness of the purchasing department's work. The measurement model developed could be used for any hospital procurement system.
NASA Astrophysics Data System (ADS)
Candra, S.; E Gunawan, F.
2017-01-01
In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.
NASA Astrophysics Data System (ADS)
Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg
The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.
Performance of the Defense Acquisition System, 2015 Annual report
2015-09-16
Planned Total (From Start to Completion) Quantity-Adjusted Unit -Procurement Recurring-Flyaway Funding (1999–2014) NOTE: This measures biennial...PAUC is a different funding measure define by statute (10 United States Code [U.S.C.], sections 2430a and 2432) consisting of the total acquisition... measures that (unlike PAUC and APUC) are fully adjusted for any changes in procurement quantity. These results help compare procurement unit costs
Federal procurement of unlicensed medicines in Brazil; findings and implications.
Teodoro, Cristiane Roberta Dos Santos; Caetano, Rosângela; Godman, Brian; Dos Reis, André Luís Almeida; Maia, Aurélio de Araújo; Ramos, Mariana de Carvalho Barbosa; Osorio-de-Castro, Claudia Garcia Serpa
2017-12-01
There are safety concerns with using unlicensed medicines across countries including Brazil. Consequently this needs to be evaluated and concerns address if pertinent. Investigate such purchases by the Brazilian Federal Government from 2004 to 2013. Procurement data from a public-access databank that contains procurement information of the Brazilian Federal Government. Each procured item was cross-referenced to its active drug approval status in the Brazilian National Register (DOU). Exploratory analysis and trend measures were performed for the variables for mapping and characterizing the purchases of non-market approved drugs. 614 (0.14%) purchases in ten years corresponding to 64 unlicensed medicines - some of which had orphan drug status - and 48 different active substances; with a growing trend in recent years. Medicines in 51% of purchases were procured before obtaining marketing approval - with eventual refusals occurring in 17.8% and cancellation due to lack of efficacy and/or safety concerns in 1.1%. Health litigation accounted for 81.9% of purchases and growing in recent years. Overall a low rate of unlicensed medicine use. However there are concerns given the current regulations in Brazil and the recent increase in the use of unlicensed medicines with increased litigation.
17 CFR 200.13 - Executive Director.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management General Organization... procurement regulations, enters into contracts, designates contracting officers, and makes procurement...-specific application of performance measures, procurement reforms, personnel reductions, financial...
Anema, Aranka; Fielden, Sarah J; Shurgold, Susan; Ding, Erin; Messina, Jennifer; Jones, Jennifer E; Chittock, Brian; Monteith, Ken; Globerman, Jason; Rourke, Sean B; Hogg, Robert S
2016-01-01
People living with HIV in high-resource settings suffer severe levels of food insecurity; however, limited evidence exists regarding dietary intake and sub-components that characterize food insecurity (i.e. food quantity, quality, safety or procurement) in this population. We examined the prevalence and characteristics of food insecurity among people living with HIV across British Columbia, Canada. This cross-sectional analysis was conducted within a national community-based research initiative. Food security was measured using the Health Canada Household Food Security Scale Module. Logistic regression was used to determine key independent predictors of food insecurity, controlling for potential confounders. Of 262 participants, 192 (73%) reported food insecurity. Sub-components associated with food insecurity in bivariate analysis included: < RDI consumption of protein (p = 0.046); being sick from spoiled/unsafe food in the past six months (p = 0.010); and procurement of food using non-traditional methods (p <0.05). In multivariable analyses, factors significantly associated with food insecurity included: procurement of food using non-traditional methods [AOR = 11.11, 95% CI: 4.79-25.68, p = <0.001]; younger age [AOR = 0.92, 95% CI: 0.86-0.96, p = <0.001]; unstable housing [AOR = 4.46, 95% CI: 1.15-17.36, p = 0.031]; household gross annual income [AOR = 4.49, 95% CI: 1.74-11.60, p = 0.002]; and symptoms of depression [AOR = 2.73, 95% CI: 1.25-5.96, p = 0.012]. Food insecurity among people living with HIV in British Columbia is characterized by poor dietary quality and food procurement methods. Notably, participants who reported procuring in non-traditional manners were over 10 times more likely to be food insecure. These findings suggest a need for tailored food security and social support interventions in this setting.
Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik
2013-01-01
Objective To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Design Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. Results The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. Conclusions The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers. PMID:23388196
Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik
2013-01-01
To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers.
Transformation of fraud activities in procurement system in Indonesia
NASA Astrophysics Data System (ADS)
Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.
2017-03-01
E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1260.145 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
38 CFR 49.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Cost and price analysis... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
40 CFR 30.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Cost and price analysis. 30.45 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
Design and engineering analysis of material procurement mobile operation platform
NASA Astrophysics Data System (ADS)
Ding, H.; Li, J.
2014-03-01
The material procurement mobile operation platform (MPMOP) consists of six modules, including network operation, truck transportation, remote communication, satellite positioning, power supply and environment regulation. The MPMOP is designed to have six major functions, including online procurement, command control, remote communication, satellite positioning, information management and auxiliary decision. The paper implements an engineering analysis on the MPMOP from three aspects, including transportation transfinite, centroid, and power dissipation.
Gonçalves, Michele Martins; Leles, Cláudio Rodrigues; Freire, Maria do Carmo Matias
2013-01-01
The objective of this ecological study was to investigate the association between caries experience in 5- and 12-year-old Brazilian children in 2010 and household sugar procurement in 2003 and the effects of exposure to water fluoridation and socioeconomic indicators. Sample units were all 27 Brazilian capital cities. Data were obtained from the National Surveys of Oral Health; the National Household Food Budget Survey; and the United Nations Program for Development. Data analysis included correlation coefficients, exploratory factor analysis, and linear regression. There were significant negative associations between caries experience and procurement of confectionery, fluoridated water, HDI, and per capita income. Procurement of confectionery and soft drinks was positively associated with HDI and per capita income. Exploratory factor analysis grouped the independent variables by reducing highly correlated variables into two uncorrelated component variables that explained 86.1% of total variance. The first component included income, HDI, water fluoridation, and procurement of confectionery, while the second included free sugar and procurement of soft drinks. Multiple regression analysis showed that caries is associated with the first component. Caries experience was associated with better socioeconomic indicators of a city and exposure to fluoridated water, which may affect the impact of sugars on the disease. PMID:24307900
Analysis of the Department of Defense Pre-Award Contracting Process
2014-12-01
Justification and Approval JBSA Joint Base San Antonio KPIs Key Performance Indicators MAJCOMs Major Command MP Mandatory Commands NAVIAR...meets desired results. Results-based performance measurement establishes key performance indicators ( KPIs ) that determine whether procurement...or goals, and underlying business processes (Cullen, 2009, p. 38). Within each quadrant, Cullen provided examples of KPIs that serve to measure
An Analysis of Bid Evaluation Procedures of Contemporary Models for Procurement in Pakistan
2016-12-01
21 E. COMPONENTS FOR BID EVALUATION .........................................21 1. Market Intelligence...PROCUREMENT SYSTEM ...............................................23 1. Basic Principles ...43 1. Principles of Procurement and Prequalification .......................43 2. Contract Types
Anema, Aranka; Fielden, Sarah J.; Shurgold, Susan; Ding, Erin; Messina, Jennifer; Jones, Jennifer E.; Chittock, Brian; Monteith, Ken; Globerman, Jason; Rourke, Sean B.; Hogg, Robert S.
2016-01-01
Objective People living with HIV in high-resource settings suffer severe levels of food insecurity; however, limited evidence exists regarding dietary intake and sub-components that characterize food insecurity (i.e. food quantity, quality, safety or procurement) in this population. We examined the prevalence and characteristics of food insecurity among people living with HIV across British Columbia, Canada. Design This cross-sectional analysis was conducted within a national community-based research initiative. Methods Food security was measured using the Health Canada Household Food Security Scale Module. Logistic regression was used to determine key independent predictors of food insecurity, controlling for potential confounders. Results Of 262 participants, 192 (73%) reported food insecurity. Sub-components associated with food insecurity in bivariate analysis included: < RDI consumption of protein (p = 0.046); being sick from spoiled/unsafe food in the past six months (p = 0.010); and procurement of food using non-traditional methods (p <0.05). In multivariable analyses, factors significantly associated with food insecurity included: procurement of food using non-traditional methods [AOR = 11.11, 95% CI: 4.79–25.68, p = <0.001]; younger age [AOR = 0.92, 95% CI: 0.86–0.96, p = <0.001]; unstable housing [AOR = 4.46, 95% CI: 1.15–17.36, p = 0.031]; household gross annual income [AOR = 4.49, 95% CI: 1.74–11.60, p = 0.002]; and symptoms of depression [AOR = 2.73, 95% CI: 1.25–5.96, p = 0.012]. Conclusions Food insecurity among people living with HIV in British Columbia is characterized by poor dietary quality and food procurement methods. Notably, participants who reported procuring in non-traditional manners were over 10 times more likely to be food insecure. These findings suggest a need for tailored food security and social support interventions in this setting. PMID:27487041
A STUDY OF FORMALLY ADVERTISED PROCUREMENT
As a method of procuring goods and services, formally advertised procurement offers a number of advantages. These include the prevention of fraud and...two-thirds of all contracts are let in these cases. This is done by examining over 2,300 contracts let under formal advertising procedures. A measure of
14 CFR 1274.506 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1274.506 Section... WITH COMMERCIAL FIRMS Procurement Standards § 1274.506 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Cost and price analysis. 84.45....45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Cost and price analysis... § 105-72.505 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...
32 CFR 32.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Cost and price analysis. 32.45 Section 32.45... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
43 CFR 12.945 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Cost and price analysis. 12.945 Section 12... Requirements § 12.945 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...
An analysis of disruptions in aerospace/defense organizations that affect the supply chain
NASA Astrophysics Data System (ADS)
Dickerson, Toscha L.
The purpose of this quantitative study was to determine whether or not functions of procurement organizations structures' and aerospace suppliers were perceived as disruptions and to identify their effects on lead time and costs within a supply chain. An analysis of employees' perception of centralized and decentralized procurement functions, aerospace and defense suppliers, lead times of goods and services, price increases, and schedule delays was conducted. Prior studies are limited in regards to understanding how specific procurement functions affects an organization procurement structure. This non-experimental quantitative study allowed for a survey to be administered to aerospace and defense companies throughout the United States to obtain information from sourcing and procurement professionals with 5 or more years of experience. The current study utilized a 10 question survey based on the 5- point Likert -type scale to determine the findings. Through descriptive and inferential statistics, using regression analysis, standard deviation, and P-value; findings indicated that the majority of the participants surveyed perceived both centralized and decentralized procurement functions affected lead time and cost of goods and services resulted in a positive effect and were considered as supply chain disruptions.
Lannau, B; Van Geyt, C; Van Maele, G; Beele, H
2015-03-01
During the procurement of musculoskeletal grafts contamination may occur. As this might be detrimental for the acceptor, it is important to know which variables influence this occurrence and to alter procurement protocols accordingly. From 2004 to 2012 we gathered information on 6,428 allografts obtained from 291 donors. Using a multiple regression model we attempted to determine the factors that influence the contamination risk during procurement. We used the following variables: cause of death, type of hospital (i.e. university hospital vs. general hospital), previous blood vessel donation, previous organ donation, donor age, time between death and the start of the procurement, duration of the procurement, number of people attending the procurement and the number of procured grafts. The multiple regression model was only able to explain 5 % of the variability of the used outcome variable. None of the variables examined appear to have an important influence on the contamination risk.
28 CFR 70.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost and price analysis. 70.45 Section 70... NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 70.45 Cost and price analysis. Some form of cost or price analysis must be made and documented in the procurement files in connection...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Cost and price analysis. 14.45 Section... COMMERCIAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 14.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with...
22 CFR 226.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Cost and price analysis. 226.45 Section 226.45...-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with...
Optimizing national immunization program supply chain management in Thailand: an economic analysis.
Riewpaiboon, A; Sooksriwong, C; Chaiyakunapruk, N; Tharmaphornpilas, P; Techathawat, S; Rookkapan, K; Rasdjarmrearnsook, A; Suraratdecha, C
2015-07-01
This study aimed to conduct an economic analysis of the transition of the conventional vaccine supply and logistics systems to the vendor managed inventory (VMI) system in Thailand. Cost analysis of health care program. An ingredients based approach was used to design the survey and collect data for an economic analysis of the immunization supply and logistics systems covering procurement, storage and distribution of vaccines from the central level to the lowest level of vaccine administration facility. Costs were presented in 2010 US dollar. The total cost of the vaccination program including cost of vaccine procured and logistics under the conventional system was US$0.60 per packed volume procured (cm(3)) and US$1.35 per dose procured compared to US$0.66 per packed volume procured (cm(3)) and US$1.43 per dose procured under the VMI system. However, the findings revealed that the transition to the VMI system and outsourcing of the supply chain system reduced the cost of immunization program at US$6.6 million per year because of reduction of un-opened vaccine wastage. The findings demonstrated that the new supply chain system would result in efficiency improvement and potential savings to the immunization program compared to the conventional system. Copyright © 2015 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.
2014-01-01
Background The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments – both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. Objective To determine realistic targets for VPA and VPB. Methods Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. Findings In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Conclusions Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs. PMID:24586899
Nelson, E A S; Bloom, David E; Mahoney, Richard T
2014-01-01
The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.
Prevalence and correlates of hospital-based autologous blood programs: a statewide survey.
Hull, A L; Neuhauser, D V; Goodnough, L T
1992-05-01
To identify potential barriers to use of autologous blood procurement to minimize homologous blood transfusion needs during elective surgery, the authors conducted a telephone survey of 120 blood bank directors, representing 138 Ohio hospitals. The prevalence of autologous blood procurement facilities, estimated volume of autologous blood, and attitudes and perceptions of the directors toward autologous blood predeposit programs were assessed. Analysis of the data indicated that 30% of Ohio hospitals have autologous blood procurement facilities; larger hospitals were more likely to have this facility. Overall, 5.5% of transfusions involve predeposited autologous blood. No significant differences were found according to hospital bed size or whether the hospital had a procurement facility. Blood bank directors perceived surgeons to be knowledgeable about autologous predeposit; patient demand and surgical practice were felt to be more effective in promoting the use of autologous blood at the hospital than were blood bank efforts. Directors who had autologous predeposit procurement facilities perceived that the facility provided a marketing advantage. Respondents from larger hospitals were more likely to perceive that these programs could be financially self-sufficient. The authors conclude that an economic cost-benefit analysis of hospital-based autologous blood procurement programs is important. Positive findings may influence transfusion services to adopt autologous blood procurement programs, whereas negative findings may convince hospitals that community blood donor facilities can provide better autologous blood procurement.
36 CFR 1210.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...
36 CFR 1210.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...
36 CFR 1210.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...
77 FR 8028 - Semiannual Regulatory Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-13
... provides summary descriptions of regulations being developed by the Civilian Agency Acquisition Council and... Analysis Required: Yes. Agency Contact: Karlos Morgan, Procurement Analyst, DOD/GSA/NASA (FAR), 1275 First... 05/00/12 Regulatory Flexibility Analysis Required: Yes. Agency Contact: William Clark, Procurement...
Systems Analysis Directorate Activities Summary August 1977
1977-09-01
are: x a. Cataloging direction b. Requirements computation c. Procurement direction d. Distribution management e. Disposal direction f...34inventory management," as a responsibility of NICP’s, includes cataloging, requirements computation, procurement direction, distribution management , maintenance...functions are cataloging, major item management, secondary item management, procurement direction, distribution management , overhaul and rebuild
reduction opportunities Domestic electricity markets Corporate renewable procurement Research Interests State and Local Clean Energy Policy Impact Analysis Corporate Renewable Energy Procurement Strategies
36 CFR § 1210.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement...
22 CFR 145.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... metric system of measurement. (vi) Preference, to the extent practicable and economically feasible, for... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145...
Gated Field-Emission Cathode Radio-Frequency (RF) Gun
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fermi Research Alliance, Fermi Alliance
The goal of this CRADA was to procure the carbon nanotube cathode from Radiabeam, install it in HBESL and make current measurements as a function of the gun gradient. The gun was operated at 1.3 GHz. After testing, send the cathode back to RadiaBeam for surface analysis.
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
NASA Technical Reports Server (NTRS)
Harris, E. D.
1980-01-01
The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.
NASA Astrophysics Data System (ADS)
Hu, Chang; Hu, Juanli; Zhou, Qi; Yang, Yue
In view of current situation and existing problem on purchasing equipment for measurement technology institution, this paper analyzes key factors that affect the standardization of equipment procurement and it proposes a set of scientific and standardized solutions for equipment procurement based on actual work.
Public procurement of health technologies in Greece in an era of economic crisis.
Kastanioti, Catherine; Kontodimopoulos, Nick; Stasinopoulos, Dionysis; Kapetaneas, Nikolaos; Polyzos, Nikolaos
2013-01-01
Public procurement is generally an important sector of the economy and, in most countries, is controlled by the introduction of regulatory and policy mechanisms. In the Greek healthcare sector, recent legislation redefined centralized procurement through the reestablishment of a state Health Procurement Committee (EPY), with an aim to formulate a plan to reduce procurement costs of medical devices and pharmaceuticals, improve payment time, make uniform medical requests, transfer redundant materials from one hospital to another and improve management of expired products. The efforts described in this paper began in early 2010, under the co-ordination of the Ministry of Health (MoH) and with the collaboration of senior staff from the International Monetary Fund (IMF), the European Commission (EC) and the European Central Bank (ECB). The procurement practices and policies set forth by EPY and the first measurable outcomes, in terms of cost savings, resulting from these policies are presented. The importance of these measures is discussed in light of the worst economic crisis faced by Greece since the restoration of democracy in 1974, as a result of both the world financial crisis and uncontrolled government spending. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
Wirtz, Veronika J; Santa-Ana-Tellez, Yared; Trout, Clinton H; Kaplan, Warren A
2012-12-01
Public sector price analyses of antiretroviral (ARV) medicines can provide relevant information to detect ARV procurement procedures that do not obtain competitive market prices. Price benchmarks provide a useful tool for programme managers and policy makers to support such planning and policy measures. The aim of the study was to develop regional and global price benchmarks which can be used to analyse public-sector price variability of ARVs in low- and middle-income countries using the procurement prices of Latin America and the Caribbean (LAC) countries in 2008 as an example. We used the Global Price Reporting Mechanism (GPRM) data base, provided by the World Health Organization (WHO), for 13 LAC countries' ARV procurements to analyse the procurement prices of four first-line and three second-line ARV combinations in 2008. First, a cross-sectional analysis was conducted to compare ARV combination prices. Second, four different price 'benchmarks' were created and we estimated the additional number of patients who could have been treated in each country if the ARV combinations studied were purchased at the various reference ('benchmark') prices. Large price variations exist for first- and second-line ARV combinations between countries in the LAC region. Most countries in the LAC region could be treating between 1.17 and 3.8 times more patients if procurement prices were closer to the lowest regional generic price. For all second-line combinations, a price closer to the lowest regional innovator prices or to the global median transaction price for lower-middle-income countries would also result in treating up to nearly five times more patients. Some rational allocation of financial resources due, in part, to price benchmarking and careful planning by policy makers and programme managers can assist a country in negotiating lower ARV procurement prices and should form part of a sustainable procurement policy.
Thrailkill, Eric A.; Bouton, Mark E.
2015-01-01
Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751
[The SWOT analysis and strategic considerations for the present medical devices' procurement].
Li, Bin; He, Meng-qiao; Cao, Jian-wen
2006-05-01
In this paper, the SWOT analysis method is used to find out the internal strength, weakness, exterior opportunities and threats of the present medical devices' procurements in hospitals and some strategic considerations are suggested as "one direction, two expansions, three changes and four countermeasures".
Business Case Analysis for Replacing the Mazak 30Y Mill-Turn Machine in SM-39. Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Booth, Steven Richard; Dinehart, Timothy Grant; Benson, Faith Ann
2015-03-19
Business case studies are being looked at to support procurement of new machines and capital equipment in the SM-39 and TA-03-0102 machine shops. The first effort conducted economic analysis of replacing the Mazak 30Y Mill-Turn Machine located in SM-39. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. The conditions under the two scenarios were defined via interviews with subject matter experts in terms of one-time and periodic costs. The results of the analysis were compiled in a life-cycle cost/benefit table. The costs of procuring, installing,more » and maintaining a new machine were balanced against the costs avoided by replacing older machinery. Productivity savings were included as a measure to show the costs avoided by being able to produce parts at a quicker and more efficient pace.« less
A Framework for Usability Evaluation in EHR Procurement.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja
2018-01-01
Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.
Defense Procurement: An Analysis of Contract Management Internal Controls
2015-03-22
monitoring activities component of the internal control framework. Acquisition Research Program Graduate School of Business & Public Policy - 7...Research Program Graduate School of Business & Public Policy - 24 - Naval Postgraduate School Tan, L. H. J. (2013). An analysis of internal controls and...Naval Postgraduate School, Monterey, CA 93943. Defense Procurement: An Analysis of Contract Management Internal Controls 22 March 2015 Dr. Juanita
Statistical analysis of the Nb3Sn strand production for the ITER toroidal field coils
NASA Astrophysics Data System (ADS)
Vostner, A.; Jewell, M.; Pong, I.; Sullivan, N.; Devred, A.; Bessette, D.; Bevillard, G.; Mitchell, N.; Romano, G.; Zhou, C.
2017-04-01
The ITER toroidal field (TF) strand procurement initiated the largest Nb3Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. This paper presents the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked (‘verified’) by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. The results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb3Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.
NASA Astrophysics Data System (ADS)
Ninomiya, Hitoshi; Nanerikawa, Susumu
Public procurement system such as Overall-Evaluation dynamically has been changed on local public works in Japan. However some characteristics of Bidding-Strategy and procurement system have not enough clarified. This paper attempt to analysis for a syatem dynamics and mechanisum of Overall-Evaluation by developing new simulation model focused on Bidding-Strategy, to propose some improvement scenario.
Results of module electrical measurement of the DOE 46-kilowatt procurement
NASA Technical Reports Server (NTRS)
Curtis, H. B.
1978-01-01
Current-voltage measurements have been made on terrestrial solar cell modules of the DOE/JPL Low Cost Silicon Solar Array procurement. Data on short circuit current, open circuit voltage, and maximum power for the four types of modules are presented in normalized form, showing distribution of the measured values. Standard deviations from the mean values are also given. Tests of the statistical significance of the data are discussed.
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2012 CFR
2012-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2011 CFR
2011-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2014 CFR
2014-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2010 CFR
2010-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2013 CFR
2013-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
NASA Technical Reports Server (NTRS)
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
Vehicle Procurement Lessons Learned at Yosemite National Park.
DOT National Transportation Integrated Search
2005-02-28
In seeking to obtain replacement buses for its Valley Shuttle fleet, Yosemite National Park encountered numerous uncertainties in the procurement process that complicated what was intended to be a relatively straightforward purchase. The analysis tha...
Toxic substances alert program
NASA Technical Reports Server (NTRS)
Junod, T. L.
1978-01-01
A toxicity profile is provided, of 187 toxic substances procured by NASA Lewis Research Center during a 3 1/2 year period, including 27 known or suspected carcinogens. The goal of the program is to assure that the center's health and safety personnel are aware of the procurement and use of toxic substances and to alert and inform the users of these materials as to the toxic characteristics and the control measures needed to ensure their safe use. The program also provides a continuing record of the toxic substances procured, who procured them, what other toxic substances the user has obtained in the past, and where similar materials have been used elsewhere at the center.
Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti
2015-01-01
In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized, automated pooled procurement models like that of Tamil Nadu are key to achieving the best procurement prices and highest possible access to medicines.
Pooling procurement in the Belgian hospital sector.
Hebert, Guy
2011-01-01
The Belgian hospital sector is following the example of a number of other European countries and for more than ten years now, has been striving to pool its medical supplies and equipment purchases in a bid to reduce costs. The various experiments of which we are aware come under both opportunist purchases and initiatives which are designed to encourage local-regional contracts. These attempts have now all come to nothing or are struggling in the absence of a structured and professional approach. In 2005, the Saint Luc University Clinic in Brussels decided to set up a high-performance purchasing department, the aim being to centre its initiatives around TCO or Total Cost of Ownership. Following an analysis of the various experiments into pooling procurement in hospitals in Europe, the Saint Luc University Clinic decided on a central procurement agency model, in accordance with new legislation on public procurement. This article seeks to highlight the prerequisites which are vital for a procurement pooling initiative, without underestimating the risks and limitations of implementing such a change in procurement practices. The Mercure central procurement agency is now the largest interhospital purchasing structure in Belgium.
ITS procurement : analysis and recommendations.
DOT National Transportation Integrated Search
1994-01-01
Virginia has met with a variety of difficulties and delays in its procurement of intelligent transportation systems, components, and studies. The Fastoll Automatic Toll System was initiated in 1987, and construction has still not begun. It has been t...
Code of Federal Regulations, 2010 CFR
2010-10-01
... for the measurement of insurance costs, the assignment of such costs to cost accounting periods, and... Section 9904.416-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... measurement and assignment of costs to cost objectives. (b) This Cost Accounting Standard does not cover... Section 9904.411-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
Competitive Advantage, Uncertainty, and Weapons Procurement: Striking Balance for the Future
2009-05-02
position of the Department of the Army, Department of Defense, or the U.S. Government. COMPETITIVE ADVANTAGE , UNCERTAINTY, AND WEAPONS PROCUREMENT: STRIKING...Competitive Advantage , Uncertainty, and Weapons Procurement: Striking Balance for the Future 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...the right balance of investments all leading to a sustained competitive advantage . This paper presents an analysis of how effective this overhaul has
15 CFR 273.3 - General policy.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the fiscal year 1992, use the metric system of measurement in its procurements, grants, and other... the use of the metric system in their procurements, grants and other business-related activities... STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES METRIC...
Code of Federal Regulations, 2010 CFR
2010-10-01
... measurement and cost assignment. (b) This Cost Accounting Standard is not intended to cover the use of pre... Section 9904.407-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
42 CFR 486.348 - Condition: Quality assessment and performance improvement (QAPI).
Code of Federal Regulations, 2010 CFR
2010-10-01
... improvement (QAPI). 486.348 Section 486.348 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT... Coverage: Organ Procurement Organizations Organ Procurement Organization Process Performance Measures § 486.348 Condition: Quality assessment and performance improvement (QAPI). The OPO must develop, implement...
The Wheelchair Procurement Process: Perspectives of Clients and Prescribers
Mortenson, William B; Miller, William C
2014-01-01
Back ground Increasing choices in assistive technology has made the process of procuring a wheelchair more complex and challenging. Purpose To explore the intricacies of the procurement process from the perspectives of clients and therapists. Methods Thirty-four participants were interviewed, including 13 wheelchair prescribers, 14 wheelchair users, and 7 wheelchair associates (family members and caregivers). Findings Analysis revealed five main themes. 1) “Who decides?” described varying degrees of client involvement in the procurement process. 2) “Expert knowledge” reflected the expert knowledge that all parties possessed. 3) “Form versus function” captured the primary and, at times, conflicting outcomes that participants wanted to achieve. 4) “Fitting in” depicted the environmental factors that affected wheelchair procurement. 5) “(Re)solutions” illustrated strategies that participants felt improved the process. Implications This study reveals clients’ experiences with wheelchair procurement, identifies potential issues therapists may encounter, and suggests possible remedies they might consider when prescribing wheelchairs within a client-centred framework. PMID:18615928
Critical analysis of procurement techniques in construction management sectors
NASA Astrophysics Data System (ADS)
Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad
2018-04-01
Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.
Medical technology procurement in Europe: a cross-country comparison of current practice and policy.
Sorenson, Corinna; Kanavos, Panos
2011-04-01
Procurement policy can influence the diffusion of medical devices into national health systems, but limited comparative evidence exists on how countries procure such technologies. This paper discusses the procurement of select medical devices across five countries (England, France, Germany, Italy, and Spain) based on a review of published and grey literature and policy documents, as well as expert interviews. All countries have introduced various regulatory or policy measures that implicitly or explicitly influence device procurement, from lists of devices for purchase to changes in financing mechanisms. There has also been movement toward more centralized procurement with the introduction of purchasing groups or consortiums, notably in England, France, Germany, and Italy. While a number of stakeholder groups are involved in purchasing activities, a greater, more formalized role for physicians and governments is needed to ensure that technologies procured best meet patient needs and align with national health care priorities and other sectoral objectives. A general theme across all national procurement systems was a focus on cost-containment, but like other areas of technology policy (e.g., coverage), basing purchasing decisions on a broader range of criteria, such as quality and health outcomes, might better allow governments to achieve value for money and support patient access to beneficial innovations. More research is needed, however, to substantiate the role and influence of procurement on balancing the adoption and affordability of medical technologies. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
DOT National Transportation Integrated Search
2013-04-01
This study details the analysis of the Florida Transit Research Inspection Procurement Services (TRIPS) Program. It provides a comparative assessment of the program with respect to out-of-state practice, provides recommendations to improve life cycle...
Liu, Junjie; Wang, Liming; Liu, Chenxi; Zhang, Xinping
2017-12-01
A new policy which required deregulation on prices of off-patent medicines for women's health during procurement was introduced in China in September 2015. The current study examines this policy's impact on the affordability of essential medicines for women's health. Based on product-level panel data, a fixed effect regression model is employed by using procurement records from Hubei Centralist Tender for Drug Purchase platform. In the model, Affordability was measured with prices. The Competition consists of two parts: generic competition and therapeutic class competition which are measured with generic competitors and therapeutic substitutes. Instrument variable is used to deal with endogeneity. The policy helped control prices of essential medicines for women's health. Generic competition helped control prices, however, therapeutic class competition caused higher prices. The new policy helped enhance the affordability of essential medicines for women's health as expected, which provides empirical evidence on price deregulation. Besides, generic competition is important in price control despite strict regulatory system in China.
48 CFR 9903.306 - Interpretations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS... Government results from a change in a contractor's cost accounting practices or from failure to comply with... are measured by the difference between the contract price agreed to and the contract price that would...
48 CFR 9904.410-60 - Illustrations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING... predominantly for research and development, rather than for the management and administration of the business... business unit cost objectives on a beneficial or causal relationship which is best measured by a base other...
[Posthumous sperm procurement and use--ethical and legal dilemmas].
Crha, I; Dostál, J; Ventruba, P; Kudela, M; Záková, J
2004-07-01
To present a review of bioethical discussion and recommendations concerning posthumous sperm procurement and postmortem parenthood. Review article. Department of Obstetrics and Gynecology, Masaryk University, Brno, Department of Obstetrics and Gynecology, Palacky University, Olomouc. Literature search in Database of Abstracts of Reviews of the Evidence (DARE) and MEDLINEplus. Posthumous sperm procurement and cryopreservation must be performed within 36 hours after death. To established appropriate medical practice, it is important to consider all stakeholders in the decision-making process: the deceased, the requesting party, the child, the physician and the society. There are only few legislative measures concerning postmortem parenthood and posthumous sperm procurement. The essential elements for postmortem reproduction are: judicial order, ethics committee approval, bereavement period of at least 6 month before use. Posthumous sperm procurement is fraught with ethical and legal implications. All stakeholder should be considered. Society for reproductive medicine should prepare acceptable standard protocol.
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2014-04-01
Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.
Analysis of Critical Parts and Materials
1980-12-01
1 1 1% 1% 1% 1% Large Orders Manual Ordering of Some Critical Parts Order Spares with Original Order Incentives Belter Capital Investment...demand 23 Large orders 24 Long lead procurement funding (including raw materials, facility funding) 25 Manpower analysis and training 26 Manual ... ordering of some critical parts 27 More active role in schedule negotiation 28 Multiple source procurements 29 Multi-year program funding 30 Order
Code of Federal Regulations, 2010 CFR
2010-10-01
... decision is made to initiate debarment and/or suspension of a contractor, the Senior Procurement Executive... the administrative file containing all relevant facts and analysis, must be forwarded to the Senior... counsel. (2) The Senior Procurement Executive shall: (i) Review the notice and administrative file for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis... most economical approach. (5) To foster greater economy and efficiency, grantees and subgrantees are... consistent with Federal cost principles (see § 13.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-04-01
... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis... most economical approach. (5) To foster greater economy and efficiency, grantees and subgrantees are... consistent with Federal cost principles (see § 85.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-07-01
... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis... most economical approach. (5) To foster greater economy and efficiency, grantees and subgrantees are... consistent with Federal cost principles (see § 97.22). Grantees may reference their own cost principles that...
7 CFR 1780.70 - Owner's procurement regulations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... practices between firms; organizational conflicts of interest; and unnecessary experience and bonding... avoid the purchase of unnecessary or duplicate items. Consideration should be given to consolidation or separation of procurement items to obtain a more economical purchase. Where appropriate, an analysis shall be...
Dual Production Sources in the Procurement of Weapon Systems: A Policy Analysis
1983-11-01
Competitive Aspects of the AIM-9B Seeker Assembly Procurement, memorandum to Carl Wilbourn , U.S. Navy OP-96D, December 16, 1977. 3 sARINC Report, p...Corporation, R-2706-DR&E, February 1981. Carroll, Frank, Competitive Aspects of the AIM-9B Seeker Assembly Procurement, Memorandum to Carl Wilbourn , U.S...David J., and Joseph P. Large, Estimated Costs of Extended Low Rate Airframe Production, The Rand Corporation, R-2243-AF, March 1978, Fisher, Gene H
Butala, Neel M.; King, Marissa D.; Reitsma, William; Formica, Richard N.; Abt, Peter L.; Reese, Peter P.; Parikh, Chirag R.
2015-01-01
Background Given growth in kidney transplant waitlists and discard rates, donor kidney acceptance is an important problem. We used network analysis to examine whether organ procurement organization (OPO) network centrality affects discard and outcomes. Methods We identified 106,160 deceased-donor kidneys recovered for transplant from 2000–2010 in SRTR. We constructed the transplant network by year with each OPO representing a node and each kidney-sharing relationship between OPOs representing a directed tie between nodes. Primary exposures were the number of different OPOs to which an OPO has given a kidney or from which an OPO has received a kidney in year preceding procurement year. Primary outcomes were discard, cold-ischemia time, delayed graft function, and 1-year graft loss. We used multivariable regression, restricting analysis to the 50% of OPOs with highest discard and stratifying remaining OPOs by kidney volume. Models controlled for kidney donor risk index, waitlist time, and kidney pumping. Results An increase in one additional OPO to which a kidney was given by a procuring OPO in a year was associated with 1.4% lower likelihood of discard for a given kidney (odds ratio, 0.986; 95% confidence interval, 0.974-0.998) among OPOs procuring high kidney volume, but 2% higher likelihood of discard (OR:1.021, CI:1.006, 1.037) among OPOs procuring low kidney volume, with mixed associations with recipient outcomes. Conclusions Our study highlights the value of network analysis in revealing how broader kidney sharing is associated with levels of organ acceptance. We conclude interventions to promote broader inter-OPO sharing could be developed to reduce discard for a subset of OPOs. PMID:26102610
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... consistent with Federal cost principles (see § 602.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 1157.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 80.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-01-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 600.422). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 66.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-04-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 135.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-04-01
.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... consistent with Federal cost principles (see § 1403.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 18.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... consistent with Federal cost principles (see § 1174.22). Grantees may reference their own cost principles...
29 CFR 95.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... 29 Labor 1 2014-07-01 2013-07-01 true Procurement procedures. 95.44 Section 95.44 Labor Office of the Secretary of Labor GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND...
29 CFR 95.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... 29 Labor 1 2013-07-01 2013-07-01 false Procurement procedures. 95.44 Section 95.44 Labor Office of the Secretary of Labor GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND...
29 CFR 95.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... 29 Labor 1 2012-07-01 2012-07-01 false Procurement procedures. 95.44 Section 95.44 Labor Office of the Secretary of Labor GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND...
Thrailkill, Eric A.; Bouton, Mark E.
2015-01-01
Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response), and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, the present experiments asked the reverse question of whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains; extinction of one consumption response specifically weakened the procurement response associated with it. The results add to evidence suggesting that rats learn a highly specific associative structure in behavior chains, and emphasize the role of learning response inhibition in extinction. PMID:26276367
Thrailkill, Eric A; Bouton, Mark E
2016-03-01
Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response) and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, in the present experiments we asked the reverse question: whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains, and extinction of one consumption response specifically weakened the procurement response associated with it. The results add to the evidence suggesting that rats learn a highly specific associative structure in behavior chains, emphasizing the role of learning response inhibition in extinction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Audette, L.G.
As originally conceived, the project called for modification of existing, commercially available stoker components. We experienced substantial delays in procurement, caused by supply backlogs and a major fire at the plant which ultimately provided the main stoker frame. Added to the problems was the bankruptcy of the L.W. Gay Stoveworks, where the project was to be located. Ultimately, parts were assembled and a combustion chamber was constructed at the Leyden Energy Corporation of Shelburne Falls, Massachusetts. A firing chamber with provision for measuring various physical and combustion parameters was constructed. The stoker, with appropriate modifications, was installed. Combustion analysis equipmentmore » was procured, and coal and wood pellets were stoked in order to test the effectiveness of the modifications. This report describes the configuration of the demonstration stoker and its modifications, as well as the testing exercise performed over the course of the project. 10 figs.« less
DISPLA: decision information system for procurement and logistics analysis
NASA Astrophysics Data System (ADS)
Calvo, Alberto B.; Danish, Alexander J.; Lamonakis, Gregory G.
2002-08-01
This paper describes an information-exchange system for Display systems acquisition and logistics support. DISPLA (Decision Information System for Procurement and Logistics Analysis) is an Internet-based system concept for bringing sellers (display system and component suppliers) and buyers (Government Program Offices and System Integrators) together in an electronic exchange to improve the acquisition and logistics analysis support of Flat Panel Displays for the military. A proof-of-concept demonstration is presented in this paper using sample data from vendor Web sites and Government data sources.
Perez-Protto, S; Nazemian, R; Matta, M; Patel, P; Wagner, K J; Latifi, S Q; Lebovitz, D J; Reynolds, J D
2018-03-01
Many deceased by neurologic criteria donors are administered inhalational agents during organ recovery surgery-a process that is characterised by warm and cold ischaemia followed by warm reperfusion. In certain settings, volatile anaesthetics (VA) are known to precondition organs to protect them from subsequent ischaemia-reperfusion injury. As such, we hypothesised that exposure to VA during organ procurement would improve post-graft survival. Lifebanc (organ procurement organisation [OPO] for NE Ohio) provided the investigators with a list of death by neurologic criteria organ donors cared for at three large tertiary hospitals in Cleveland between 2006 and 2016-details about the surgical recovery phase were extracted from the organ donors' medical records. De-identified data on graft survival were obtained from the United Network for Organ Sharing (UNOS). The collated data underwent comparative analysis based on whether or not VA were administered during procurement surgery. Records from 213 donors were obtained for analysis with 138 exposed and 75 not exposed. Demographics, medical histories, and organ procurement rates were similar between the two cohorts. For the primary endpoint, there were no significant differences observed in either early (30-day) or late (five-year) graft survival rates for kidney, liver, lung, or heart transplants. Our findings from this retrospective review of a relatively small cohort do not support the hypothesis that the use of VA during the surgical procurement phase improves graft survival. Reviews of larger datasets and/or a prospective study may be required to provide a definitive answer.
Teichgräber, Ulf K; de Bucourt, Maximilian
2012-01-01
OJECTIVES: To eliminate non-value-adding (NVA) waste for the procurement of endovascular stents in interventional radiology services by applying value stream mapping (VSM). The Lean manufacturing technique was used to analyze the process of material and information flow currently required to direct endovascular stents from external suppliers to patients. Based on a decision point analysis for the procurement of stents in the hospital, a present state VSM was drawn. After assessment of the current status VSM and progressive elimination of unnecessary NVA waste, a future state VSM was drawn. The current state VSM demonstrated that out of 13 processes for the procurement of stents only 2 processes were value-adding. Out of the NVA processes 5 processes were unnecessary NVA activities, which could be eliminated. The decision point analysis demonstrated that the procurement of stents was mainly a forecast driven push system. The future state VSM applies a pull inventory control system to trigger the movement of a unit after withdrawal by using a consignment stock. VSM is a visualization tool for the supply chain and value stream, based on the Toyota Production System and greatly assists in successfully implementing a Lean system. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
Tang, Yuqing; Liu, Chaojie; Liu, Junjie; Zhang, Xinping; Zuo, Keyuan
2018-08-01
The overuse of antibiotics has become a major public health challenge worldwide, especially in low- and middle-income countries, including China. In 2009, the Chinese government launched a series of measures to de-incentivise over-prescription in public health facilities, including decoupling the link between facility income and the sale of medicines. We evaluated the effects of these measures on procurement costs and the volume of antibiotics in county public hospitals. The study was undertaken in the Hubei province of China, where 64 county public hospitals implemented the reform in sequence at three different stages. A quasi-natural experiment design was employed. We performed generalised linear regressions with a difference-in-differences approach using 22,713 procurement records of antibiotics from November 2014 to December 2016. The regression results showed that the reform contributed to a 14.79% increase in total costs for antibiotics (p = 0.013), particularly costs for injectable antibiotics (p = 0.022) and first-line antibiotics (p = 0.030). The procurement prices for antibiotics remained largely comparable to those in the control group, but the reform led to a 17.30% increase in the procurement volume (expressed as defined daily doses) of second-line antibiotics (p = 0.032). County public hospitals procured more antibiotics and greater numbers of expensive antibiotics, such as those administered via injection, to compensate for the loss of income from the sale of medicines, leading to an increased total cost of antibiotics.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
... elements of the Department of Homeland Security concerned with the analysis of intelligence information... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 RIN 0750-AG67 Defense Federal Acquisition Regulation Supplement; Limitations on Procurements With Non-Defense Agencies (DFARS...
Transplant ethics under scrutiny – responsibilities of all medical professionals
Trey, Torsten; Caplan, Arthur L.; Lavee, Jacob
2013-01-01
In this text, we present and elaborate ethical challenges in transplant medicine related to organ procurement and organ distribution, together with measures to solve such challenges. Based on internationally acknowledged ethical standards, we looked at cases of organ procurement and distribution practices that deviated from such ethical standards. One form of organ procurement is known as commercial organ trafficking, while in China the organ procurement is mostly based on executing prisoners, including killing of detained Falun Gong practitioners for their organs. Efforts from within the medical community as well as from governments have contributed to provide solutions to uphold ethical standards in medicine. The medical profession has the responsibility to actively promote ethical guidelines in medicine to prevent a decay of ethical standards and to ensure best medical practices. PMID:23444249
Transplant ethics under scrutiny - responsibilities of all medical professionals.
Trey, Torsten; Caplan, Arthur L; Lavee, Jacob
2013-02-01
In this text, we present and elaborate ethical challenges in transplant medicine related to organ procurement and organ distribution, together with measures to solve such challenges. Based on internationally acknowledged ethical standards, we looked at cases of organ procurement and distribution practices that deviated from such ethical standards. One form of organ procurement is known as commercial organ trafficking, while in China the organ procurement is mostly based on executing prisoners, including killing of detained Falun Gong practitioners for their organs. Efforts from within the medical community as well as from governments have contributed to provide solutions to uphold ethical standards in medicine. The medical profession has the responsibility to actively promote ethical guidelines in medicine to prevent a decay of ethical standards and to ensure best medical practices.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-18
... DEPARTMENT OF STATE [Public Notice: 7525] Lifting of Sanctions on Person Associated With the A.Q. Khan Nuclear Procurement Network AGENCY: Bureau of International Security and Nonproliferation, Department of State. ACTION: Notice. SUMMARY: A determination has been made to lift the measures imposed on...
2016-01-01
evaluation method that identifies the root causes of an undesired outcome and the Summary xix Root Cause of the JPALS Nunn-McCurdy Breach Under current... evaluation (RDT&E) unit (from 12 to 11) and an increase of one procurement unit for a new total of 27 procurement units. The revised procurement quantity...from the status of the overall portfolio of MDAPs and the status of other subportfolios. In assessing a portfolio, analysts may need to evaluate the
A Least Cost Study for Book Procurement at the Naval Postgraduate School Library
1990-06-01
NAVAL POSTGRADUATE SCHOOL Monterey, California S7GR W DTIC &ELECTF ~jj N30 1 991TAES 0)0 THESIS B A LEAST COST STUDY FOR BOOK PROCUREMENT AT THE...Monterey, California 93943-5000 Monterey, California 93943-5000 C’ ’. z - I l a-, -.~,:IV A LEAST COST STUDY FOR BOOK PROCUREMENT AT THE NAVAL...Cost Study . , A . O -’U] aL’,"- ) t’ ’’- The primary objective of this thesis is to perform a cost effective- ness analysis of the various purchasing
1999-10-01
Technical Report 5-20448 & 5- 20449 Contract No. DAAH01-98-D-R001 Delivery Order No. 34 Microelectronics Status Analysis and Secondary Part...Procureability Assessment of the THAAD Weapon System. (5-20448 & 5- 20449 ) Final Technical Report for Period 21 January 1999 through 30 September 1999...Huntsville Huntsville, AL 35899 5. FUNDING NUMBERS 8. PERFORMING ORGANIZATION REPORT NUMBER 5-20448 & 5- 20449 9. SPONSORING/MONITORING AGENCY
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2013-12-30
Although procurement consumes nearly 40% of Global Fund's money, no analyses have been published to show how costs vary across regions and time. This paper presents an analysis of malaria-related commodity procurement data from 79 countries, as reported through the Global Fund's price and quality reporting (PQR) system for the 2005-2012 period. Data were analysed for the three most widely procured commodities for prevention, diagnosis and treatment of malaria. These were long-lasting insecticide-treated nets (LLINs), malaria rapid diagnostic tests (RDTs) and the artemether/lumefantrine (AL) combination treatment. Costs were compared across time (2005-2012), regions, and between individual procurement reported through the PQR and pooled procurement reported through the Global Fund's voluntary pooled procurement (VPP) system. All costs were adjusted for inflation and reported in US dollars. The data included 1,514 entries reported from 79 countries over seven years. Of these, 492 entries were for LLINs, 330 for RDTs and 692 for AL. Considerable variations were seen by commodity, although none showed an increase in cost. The costs for LLINs, RDTs and AL all dropped significantly over the period of analysis. Regional variations were also seen, with the cost for all three commodities showing significant variations. The median cost for a single LLIN ranged from USD 4.3 in East Asia to USD 5.0 in West and Central Africa. The cost of a single RDT was lowest in West and Central Africa at US$ 0.57, and highest in the Latin American region at US$ 1.1. AL had the narrowest margin of between US$ 0.06 per tablet in sub-Saharan Africa and South Asia, and US$ 0.08 in the Latin American and Eastern Europe regions. This paper concludes that global procurement costs do vary by region and have reduced overall over time. This suggests a mature market is operating when viewed from the global level, but regional variation needs further attention. Such analyses should be done more often to identify and correct market insufficiencies.
Implementation of a computer database testing and analysis program.
Rouse, Deborah P
2007-01-01
The author is the coordinator of a computer software database testing and analysis program implemented in an associate degree nursing program. Computer software database programs help support the testing development and analysis process. Critical thinking is measurable and promoted with their use. The reader of this article will learn what is involved in procuring and implementing a computer database testing and analysis program in an academic nursing program. The use of the computerized database for testing and analysis will be approached as a method to promote and evaluate the nursing student's critical thinking skills and to prepare the nursing student for the National Council Licensure Examination.
USAFSAM Review and Analysis of Radiofrequency Radiation Bioeffects Literature. Fifth Report.
1985-03-01
exteriorized between the scapulae. The tip of the catheter was positioned at the juncture between the superior and inferior venae cavae . With this preparation...other than in connection with a definitely Government-related procure- ment, the United States Government incurs no responsibility or any obligation...Between experimental sessions, Frey and Seifert measured the power density with a quarter-wave dipole connected to a commercial thermistor and power meter
The organization of organ procurement.
Prottas, J M
1989-01-01
The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.
DuBay, Derek A.; Redden, David T.; Bryant, Mary K.; Dorn, David P; Fouad, Mona N.; Gray, Stephen H.; White, Jared A.; Locke, Jayme E.; Meeks, Christopher B.; Taylor, Garry C.; Kilgore, Meredith L.; Eckhoff, Devin E.
2014-01-01
Background The strategy of evaluating every donation opportunity warrants an investigation into the financial feasibility of this practice. The purpose of this investigation is to measure resource utilization required for procurement of transplantable organs in an organ procurement organization (OPO). Methods Donors were stratified into those that met OPTN-defined eligible death criteria (ED Donors, n=589) and those that did not (NED Donors, n=703). Variable direct costs and time utilization by OPO staff for organ procurement were measured and amortized per organ transplanted using permutation methods and statistical bootstrapping/resampling approaches. Results More organs per donor were procured (3.66 ± 1.2 vs. 2.34 ± 0.8, p<0.0001) and transplanted (3.51 ± 1.2 vs. 2.08 ± 0.8, p<0.0001) in ED donors compared to NED donors. The variable direct costs were significantly lower in NED donors ($29,879.4 ± 11590.1 vs. $19,019.6 ± 7599.60, p<0.0001). In contrast, the amortized variable direct costs per organ transplanted were significantly higher in the NED donors ($8,414.5 ± 138.29 vs. $9,272.04 ± 344.56, p<0.0001). ED donors where thoracic organ procurement occurred were 67% more expensive than in abdominal-only organ procurement. The total time allocated per donor was significantly shorter in NED donors (91.2 ± 44.9 hours vs. 86.8 ± 78.6, p=0.01). In contrast, the amortized time per organ transplanted was significantly longer in the NED donors (23.1 ± 0.8 hours vs. 36.9 ± 3.2, p<0.001). Discussion The variable direct costs and time allocated per organ transplanted is significantly higher in donors that do not meet the eligible death criteria. PMID:24503760
DuBay, Derek A; Redden, David T; Bryant, Mary K; Dorn, David P; Fouad, Mona N; Gray, Stephen H; White, Jared A; Locke, Jayme E; Meeks, Christopher B; Taylor, Garry C; Kilgore, Meredith L; Eckhoff, Devin E
2014-05-27
The strategy of evaluating every donation opportunity warrants an investigation into the financial feasibility of this practice. The purpose of this investigation is to measure resource utilization required for procurement of transplantable organs in an organ procurement organization (OPO). Donors were stratified into those that met OPTN-defined eligible death criteria (ED donors, n=589) and those that did not (NED donors, n=703). Variable direct costs and time utilization by OPO staff for organ procurement were measured and amortized per organ transplanted using permutation methods and statistical bootstrapping/resampling approaches. More organs per donor were procured (3.66±1.2 vs. 2.34±0.8, P<0.0001) and transplanted (3.51±1.2 vs. 2.08±0.8, P<0.0001) in ED donors compared with NED donors. The variable direct costs were significantly lower in the NED donors ($29,879.4±11590.1 vs. $19,019.6±7599.60, P<0.0001). In contrast, the amortized variable direct costs per organ transplanted were significantly higher in the NED donors ($8,414.5±138.29 vs. $9,272.04±344.56, P<0.0001). The ED donors where thoracic organ procurement occurred were 67% more expensive than in abdominal-only organ procurement. The total time allocated per donor was significantly shorter in the NED donors (91.2±44.9 hr vs. 86.8±78.6 hr, P=0.01). In contrast, the amortized time per organ transplanted was significantly longer in the NED donors (23.1±0.8 hr vs. 36.9±3.2 hr, P<0.001). The variable direct costs and time allocated per organ transplanted is significantly higher in donors that do not meet the eligible death criteria.
Procurement of alcohol and underage drinking among adolescents in Ontario.
Smart, R G; Adlaf, E M; Walsh, G W
1996-07-01
The purpose of this article is to examine the procurement of alcohol among underage drinkers. The data are based on a survey of 3,571 students in Ontario schools. Underage drinkers were those younger than 19 years of age. Data were gathered with an anonymous questionnaire administered in classrooms in 1992. The data include descriptive analysis of underage procurement and a cluster analysis of underage drinker types (n = 1,125: 566 female). Most students found alcohol easy to obtain, with the most common access being from parents' supplies or older friends. Four types of underage drinkers were identified: bar drinkers (5%), frequent purchasers (10%), frequent obtainers (3%) and infrequent obtainers (83%). Frequent self purchasers and infrequent secondary purchasers have the highest levels of consumption and problems. However, most underage drinkers report no problems.
Medical device procurement in low- and middle-income settings: protocol for a systematic review.
Diaconu, Karin; Chen, Yen-Fu; Manaseki-Holland, Semira; Cummins, Carole; Lilford, Richard
2014-10-21
Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic.
Factors influencing global antiretroviral procurement prices.
Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio
2009-11-18
Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.
Medical device procurement in low- and middle-income settings: protocol for a systematic review
2014-01-01
Background Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Methods/design Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. Discussion The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic. PMID:25336161
2015-09-01
agreement PBL performance based logistics PCO procuring contracting officer PHS&T packaging, handling, storage & transportation PM program manager...from which a program manager must decide, with the assistance of the program’s Procurement Contracting Officer ( PCO ). As one of the key tenets of PBL, a
ERIC Educational Resources Information Center
Jilcott, Stephanie B.; Moore, Justin B.; Wall-Bassett, Elizabeth D.; Liu, Haiyong; Saelens, Brian E.
2011-01-01
Objective: To examine associations between self-reported vehicular travel behaviors, perceived stress, food procurement practices, and body mass index among female Supplemental Nutrition Assistance Program (SNAP) participants. Analysis: The authors used correlation and regression analyses to examine cross-sectional associations between travel time…
Alexander, Charles E
2006-09-01
In June 2006, the Centers for Medicare & Medicaid Services released the final rule for the conditions of participation for organ procurement organizations in the United States. The new guidelines change the way OPOs are measured, shifting from a population-based set of performance measures to a system that is based on eligible donors and conversion rates. In addition to the change in measurement philosophy, CMS has included statements, regarding organizational structure, staffing, and research as standard measures for OPOs. The change from solely donation and transplantation measures is significant for the community, and will result in changes in the way OPOs structure their organizations and governing and clinical boards.
Tang, Yuqing; Liu, Chaojie; Zhang, Xinping
2017-02-01
The low availability of essential medicines is a worldwide issue of concern. In 2009, China introduced a National Essential Medicines List (NEML), with NEML medicines being purchased in bulk at contracted prices established by tenders conducted at the provincial level. The availability of essential medicines in the public sector largely relies on commercial supply chains. The objectives of this paper were to analyze the delivery performance of essential medicines under NEML provincial procurement arrangements, and to determine whether the procurement volume and price of medicines are associated with the delivery performance of suppliers. We reviewed 9390 recorded orders of 1099 essential medicines in Hubei province from August 2011 to April 2012. The reliability of medicine delivery in-full and on-time (DIFOT) was considered the performance indicator, and we used Spearman correlation analyses to explore whether there were any associations between DIFOT and procurement price and volume. Quantile regressions were performed to determine such associations. The DIFOT had positive correlations with procurement price and volume. The Spearman rank correlation coefficients between price and DIFOT were 0.114, 0.34 and 0.25 for medicines with low one-third, middle one-third and high one-third procurement volumes, respectively. The quantile regression analysis revealed a positive association between price and DIFOT across all quantiles of DIFOT, and although significant positive associations between volume and DIFOT were only found at the 25th percentile of DIFOT, volume showed significant interactions with price for both the 25th and 50th percentiles of DIFOT. Higher procurement price is associated with better delivery performance of essential medicines; however, it is important to link procurement price with procurement volume. Increasing procurement volume may alleviate the negative effect of low price on delivery performance. Variation in volumes of repeated orders imposes uncertainties and may jeopardize the delivery of essential medicines.
A registry analysis of damage to the deceased donor pancreas during procurement.
Ausania, F; Drage, M; Manas, D; Callaghan, C J
2015-11-01
Surgical injury to the pancreas is thought to occur commonly during procurement. The UK Transplant Registry was analyzed to determine the frequency of pancreatic injuries, identify factors associated with damage, and assess the impact of injuries on graft survival. Twelve hundred ninety-six pancreata were procured from donation after brain death donors, with 314 (19.5%) from donation after circulatory death donors. More than 50% of recovered pancreata had at least one injury, most commonly a short portal vein (21.5%). Liver donation, procurement team origin, hepatic artery (HA) arising from the superior mesenteric artery (SMA), and increasing donor BMI were associated with increased rates of pancreas damage on univariate analyses; on multivariate analysis only the presence of an HA from the SMA remained significant (p = 0.02). Six hundred forty solid organ pancreas transplants were performed; 238 had some form of damage. Overall, there was no difference in graft survival between damaged and undamaged organs (p = 0.28); however, graft loss was significantly more frequent in pancreata with arterial damage (p = 0.04) and in those with parenchymal damage (p = 0.05). Damage to the pancreas during organ recovery is more common than other organs, and meticulous surgical technique and awareness of damage risk factors are essential to reduce rates of procurement-related injuries. © Copyright 2015 The American Society of Transplantation and the American Society of Transplant Surgeons.
Benchmarking in national health service procurement in Scotland.
Walker, Scott; Masson, Ron; Telford, Ronnie; White, David
2007-11-01
The paper reports the results of a study on benchmarking activities undertaken by the procurement organization within the National Health Service (NHS) in Scotland, namely National Procurement (previously Scottish Healthcare Supplies Contracts Branch). NHS performance is of course politically important, and benchmarking is increasingly seen as a means to improve performance, so the study was carried out to determine if the current benchmarking approaches could be enhanced. A review of the benchmarking activities used by the private sector, local government and NHS organizations was carried out to establish a framework of the motivations, benefits, problems and costs associated with benchmarking. This framework was used to carry out the research through case studies and a questionnaire survey of NHS procurement organizations both in Scotland and other parts of the UK. Nine of the 16 Scottish Health Boards surveyed reported carrying out benchmarking during the last three years. The findings of the research were that there were similarities in approaches between local government and NHS Scotland Health, but differences between NHS Scotland and other UK NHS procurement organizations. Benefits were seen as significant and it was recommended that National Procurement should pursue the formation of a benchmarking group with members drawn from NHS Scotland and external benchmarking bodies to establish measures to be used in benchmarking across the whole of NHS Scotland.
Geographic information system-based spatial analysis of sawmill wood procurement
Nathaniel M. Anderson; Rene H. Germain; Eddie Bevilacqua
2011-01-01
In the sawmill sector of the forest products industry, the clustering of mills and wide variation in forest stocking and ownership result in sawlog markets that are complex and spatially differentiated. Despite the inherent spatial attributes of markets for stumpage and logs, few studies have used geospatial methods to examine wood procurement in detail across...
Moronkola, O A; Amosu, A; Okonkwo, C
Of 1,200 questionnaires administered in a cross-sectional study involving University of Ibadan female students, 1000 were found useable for data analysis. Analysis found that a majority of respondents (56.4%) had little knowledge about conception and frequently engaged in sexual intercourse for many reasons, including: to have fun; to show they were mature; and to seek material reward. Also, 61.1% had procured abortion before and most of them did not procure it from government-owned hospitals/clinics, which may likely make them prone to health consequences of unsafe abortion. Part of our recommendations are the need to introduce health education (incorporating sexuality education) into the General Studies Program of the university and that home training on aspects relating to sexuality education be given to and promoted among young people.
Procurement specifications report. IMBLS phase B-4
NASA Technical Reports Server (NTRS)
1970-01-01
Procurement specifications to provide vendors of space systems with supporting information to accurately price the selected major buy items are illustrated. In performing this task, rigid constraints on specifications and drawing details are avoided beyond those necessary to define basic requirements. Described are digital processing equipment, mass spectrometer, body mass measuring device, sensors, bio-belt power source, vision tester and instrumentation for a biochemical station.
Assessing bone banking activities at University of Malaya medical centre.
Mohd, Suhaili; Samsuddin, Sharifah Mazni; Ramalingam, Saravana; Min, Ng Wuey; Yusof, Norimah; Zaman, T Kamarul; Mansor, Azura
2015-12-01
The main advantage of establishing in-house bone banks is its ability to readily provide allograft bones for local surgeries. Bone procurement activities of our university bone bank during the 10 years of operation were reviewed. Socio-demographic data of donors, types of bone procured, cases of rejected bones and types of allograft bones transplanted are presented. From 179 potential donors, 73 % were accepted with 213 procured bones. Femoral head was the common bone transplanted (45 %), as it was also the most common procured (82 %). Bones were rejected mainly due to non-technical reasons (83 %) rather than positive results of microbiological (13 %) and serological (4 %) tests. Comprehensive data could not be obtained for further analysis due to difficulties in retrieving information. Therefore, quality assurance system was improved to establish more systematic documentations, as the basis of good banking practice with process control hence allowing traceability.
Exploring the relationship between planning and procurement in Western U.S. electric utilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carvallo Bodelon, Juan Pablo; Sanstad, Alan H.; Larsen, Peter H.
Integrated resource planning (IRP) is an important regulatory process used in many U.S. states to formulate and evaluate least-cost and risk-assessed portfolios to meet future load requirements for electric utilities. In principle, effective implementation of IRP seeks to assure regulators and the public that utility investment decisions, given uncertainty, are as cost-effective as possible. However, to date, there is no empirical assessment on the effectiveness of IRP implementation. In this analysis, we compare planning, procurement processes and actual decisions for a sample of twelve load serving entities (LSEs) across the Western U. S. from 2003-2014. The 2008/2009 recession provides amore » unique “stress test” to the planning process and offers an excellent opportunity to trace how procurement decisions responded to this largely unforeseen event. In aggregate, there is a general alignment between planned and procured supply-side capacity. However, there are significant differences in the choice of supply-side resources and type of ownership for individual LSEs. We develop case studies for three LSEs and find that subsequent plans differ significantly due to changes in the planning environment and that procurement decisions in some cases are impacted by factors that are not accounted for in the planning process. Our results reveal that a limited amount of information produced during the long-term planning process (e.g., forecasts, methods, and least cost/risk portfolios) are ultimately used during the procurement process, and that the latter process relies extensively on the most recent information available for decision making. These findings suggest that states' IRP rules and regulations mandating long-term planning horizons with the same analytical complexity throughout the planning period may not create useful information for the procurement process. The social value of a long-term planning process that departs from procurement and the balance between transparency and complexity of the planning and procurement processes is an open question.« less
Factors influencing global antiretroviral procurement prices
2009-01-01
Background Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. Methods An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Results Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. Conclusion One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this. PMID:19922690
De la Hoz-Restrepo, Fernando; Castañeda-Orjuela, Carlos; Paternina, Angel; Alvis-Guzman, Nelson
2013-07-02
To review the approaches used in the cost-effectiveness analysis (CEAs) literature to estimate the cost of expanded program on immunization (EPI) activities, other than vaccine purchase, for rotavirus and pneumococcal vaccines. A systematic review in PubMed and NHS EED databases of rotavirus and pneumococcal vaccines CEAs was done. Selected articles were read and information on how EPI costs were calculated was extracted. EPI costing approaches were classified according to the method or assumption used for estimation. Seventy-nine studies that evaluated cost effectiveness of rotavirus (n=43) or pneumococcal (n=36) vaccines were identified. In general, there are few details on how EPI costs other than vaccine procurement were estimated. While 30 studies used some measurement of that cost, only one study on pneumococcal vaccine used a primary cost evaluation (bottom-up costing analysis) and one study used a costing tool. Twenty-seven studies (17 on rotavirus and 10 on pneumococcal vaccine) assumed the non-vaccine costs. Five studies made no reference to additional costs. Fourteen studies (9 rotavirus and 5 pneumococcal) did not consider any additional EPI cost beyond vaccine procurement. For rotavirus studies, the median for non-vaccine cost per dose was US$0.74 in developing countries and US$6.39 in developed countries. For pneumococcal vaccines, the median for non-vaccine cost per dose was US$1.27 in developing countries and US$8.71 in developed countries. Many pneumococcal (52.8%) and rotavirus (60.4%) cost-effectiveness analyses did not consider additional EPI costs or used poorly supported assumptions. Ignoring EPI costs in addition to those for vaccine procurement in CEA analysis of new vaccines may lead to significant errors in the estimations of ICERs since several factors like personnel, cold chain, or social mobilization can be substantially affected by the introduction of new vaccines. Copyright © 2013 Elsevier Ltd. All rights reserved.
Explosives for Lunar Seismic Profiling Experiment (LSPE)
NASA Technical Reports Server (NTRS)
1973-01-01
Explosive charges of various sizes were investigated for use in lunar seismic studies. Program logistics, and the specifications for procurement of bulk explosives are described. The differential analysis, thermal properties, and detonation velocity measurements on HNS/Teflon 7C 90/10 are reported along with the field tests of the hardware. It is concluded that nearly all large explosive charges crack after fabrication, from aging or thermal shock. The cracks do not affect the safety, or reliability of the explosives.
Energy-efficient Public Procurement: Best Practice in Program Delivery
DOE Office of Scientific and Technical Information (OSTI.GOV)
Payne, Christopher; Weber, Andrew; Semple, Abby
2013-02-15
This document illustrates the key issues and considerations involved in implementing energy-efficient public procurement. Our primary sources of information have been our partners in the Super Efficient Equipment and Appliance Deployment (SEAD) Initiative Procurement Working Group. Where applicable, we have highlighted specific ways in which working group participants have successfully overcome barriers to delivering effective programs. The following key points emerge from this analysis of programs for energy-efficient public procurement. Lessons for both developed and developing programs are highlighted throughout the guide. 1. Policy: Policy provides the initiative to begin a transition from first cost to life-cycle cost based purchasingmore » methods and culture. Effective policy is well-communicated, establishes accountability from top to bottom of organizations and simplifies the processes necessary to comply. Flexibility and responsiveness are essential in policy development and implementation. Mandatory and voluntary policies may complement one another. 2. Procurement Criteria: Procurement staff must be confident that energy-efficient procurement criteria offer the best long-term value for their organization’s money and represent real environmental gains. Involving multiple stakeholders at the early stages of the criteria creation process can result in greater levels of cooperation from private industry. Criteria should make comparison of products easy for purchasers and require minimal additional calculations. Criteria will need to be regularly updated to reflect market developments. 3. Training: Resources for the creation of training programs are usually very limited, but well-targeted training is necessary in order for a program to be effective. Training must emphasize a process that is efficient for purchasers and simplifies compliance. Purchaser resources and policy must be well designed for training to be effective. Training program development is an excellent opportunity for collaboration amongst public authorities. 4. Procurement Processes: Many tools and guides intended to help buyers comply with energy-efficient procurement policy are designed without detailed knowledge of the procurement process. A deeper understanding of purchasing pathways allows resources to be better directed. Current research by national and international bodies aims to analyze purchasing pathways and can assist in developing future resources.« less
Organ procurement from executed prisoners in China.
Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J
2014-10-01
Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.
Nuclear Matrix Proteins in Disparity of Prostate Cancer
2013-09-01
nuclear coactivator-3 (NCOA3). 5 Methods Patients and Prostate Cancer Specimens Fresh, flash -frozen specimens were obtained from age- (50 to...for reliable data interpretation. Gene Array Analysis Total RNA isolated from LCM-procured normal epithelium and tumor cells from flash -frozen...PCR Briefly, RNA was extracted from matched LCM procured normal epithelium and tumor cells of age-, tumor grade-matched flash -frozen sections (n=24
Competitiveness in the Services Sector: Understanding the Contracting Data
2012-09-01
Retrieved from http://www.acq.osd.mil/osbp/sbir/sb/eligibility.shtml Denes, T. A. (1997). Do small business set - asides increase the cost of...comprises small businesses , while TechAmerica and the Coalition for Government Procurement primarily comprise large firms. Our discussions with... procurement auctions . Lamm, D. V. (1987). Why firms refuse DOD business : an analysis of rationale. National Contract Management Journal , 21 (Winter
Steinberger, Dina M; Douglas, Stephen V; Kirschbaum, Mark S
2009-09-01
A multidisciplinary team from the University of Wisconsin Hospital and Clinics transplant program used failure mode and effects analysis to proactively examine opportunities for communication and handoff failures across the continuum of care from organ procurement to transplantation. The team performed a modified failure mode and effects analysis that isolated the multiple linked, serial, and complex information exchanges occurring during the transplantation of one solid organ. Failure mode and effects analysis proved effective for engaging a diverse group of persons who had an investment in the outcome in analysis and discussion of opportunities to improve the system's resilience for avoiding errors during a time-pressured and complex process.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Procurement and Assistance Data System (PADS) provides a mechanism for collecting, assembling, organizing, and presenting acquisition and assistance data for the Department of Energy (DOE). This handbook and associated documents establish a uniform system to report acquisition/assistance data to PADS for the collection, processing, and dissemination of official statistical data on the Department`s acquisition and assistance actions. The data provides, based on information available at the time of request, a basis for any recurring and special reports to the senior procurement executive, Congress, General Accounting Office (GAO), Federal executive agencies, Office of management and Budget (OMB), and the generalmore » public. It provides information for measuring and assessing the extent to which small business firms and small disadvantages business enterprises are sharing in DOE placement, and for other acquisition and assistance policy and management control purposes. The Handbook for the Preparation of the Individual Procurement Action Report (IPAR) has been designed in two sections; Procurement and Financial Assistance to support the individual forms.« less
An Analysis of Internal Controls and Procurement Fraud Deterrence
2013-12-01
might keep the organization from achieving its objectives and analyze risks , including fraud risk , so as to decide how the risk should be managed ( COSO ...internal control to adequately manage the risk ( COSO , 2013). Risk management involves developing the effective internal control targeted at a...structure and management . While the risk of fraud cannot be eliminated entirely, it can be greatly reduced with an appropriate procurement fraud prevention
CPTAC Biospecimen Collection Solicitation | Office of Cancer Clinical Proteomics Research
A funding opportunity in support of the National Cancer Institute’s Clinical Proteomic Tumor Analysis Consortium (CPTAC) seeks to prospectively procure tumor samples, collected for proteomics investigation. The scope of work under this Statement of Work encompasses the activities needed to prospectively procure high quality, clinically annotated human tumor samples, blood and plasma, and when feasible, normal tissue from volunteer patients suffering from colon, ovarian, and breast cancer.
Lopez, Joseph; Ameri, Afshin; Susarla, Srinivas M; Reddy, Sashank; Soni, Ashwin; Tong, J W; Amini, Neda; Ahmed, Rizwan; May, James W; Lee, W P Andrew; Dorafshar, Amir
2016-01-01
It is currently unknown whether formal research training has an influence on academic advancement in plastic surgery. The purpose of this study was to determine whether formal research training was associated with higher research productivity, academic rank, and procurement of extramural National Institutes of Health (NIH) funding in plastic surgery, comparing academic surgeons who completed said research training with those without. This was a cross-sectional study of full-time academic plastic surgeons in the United States. The main predictor variable was formal research training, defined as completion of a postdoctoral research fellowship or attainment of a Doctor of Philosophy (PhD). The primary outcome was scientific productivity measured by the Hirsh-index (h-index, the number of publications, h that have at least h citations each). The secondary outcomes were academic rank and NIH funding. Descriptive, bivariate, and multiple regression statistics were computed. A total of 607 academic surgeons were identified from 94 Accreditation Council for Graduate Medical Education-accredited plastic surgery training programs. In all, 179 (29.5%) surgeons completed formal research training. The mean h-index was 11.7 ± 9.9. And, 58 (9.6%) surgeons successfully procured NIH funding. The distribution of academic rank was the following: endowed professor (5.4%), professor (23.9%), associate professor (23.4%), assistant professor (46.0%), and instructor (1.3%). In a multiple regression analysis, completion of formal research training was significantly predictive of a higher h-index and successful procurement of NIH funding. Current evidence demonstrates that formal research training is associated with higher scientific productivity and increased likelihood of future NIH funding. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
1981-03-12
Procurement Work Directive ( PWV ) Procurement Army, CostL to Procure Cost Differential Secondary (PAS) Cost to Buy Economic Order Quantity Procurement...and Assignment of Buyer h. Solicitation Fffort . ) (1) Procurement Planning ( ) ( ) (?) PWV Review and Small Business Coordination ( (3) Determination
A Study on Strategic Planning and Procurement of Medicals in Uganda’s Regional Referral Hospitals
2016-01-01
This study was an analysis of the effect of strategic planning on procurement of medicals in Uganda’s regional referral hospitals (RRH’s). Medicals were defined as essential medicines, medical devices and medical equipment. The Ministry of Health (MOH) has been carrying out strategic planning for the last 15 years via the Health Sector Strategic Plans. Their assumption was that strategic planning would translate to strategic procurement and consequently, availability of medicals in the RRH’s. However, despite the existence of these plans, there have been many complaints about expired drugs and shortages in RRH’s. For this purpose, a third variable was important because it served the role of mediation. A questionnaire was used to obtain information on perceptions of 206 respondents who were selected using simple random sampling. 8 key informant interviews were held, 2 in each RRH. 4 Focus Group Discussions were held, 1 for each RRH, and between 5 and 8 staff took part as discussants for approximately three hours. The findings suggested that strategic planning was affected by funding to approximately 34% while the relationship between funding and procurement was 35%. The direct relationship between strategic planning and procurement was 18%. However when the total causal effect was computed it turned out that strategic planning and the related variable of funding contributed 77% to procurement of medicals under the current hierarchical model where MOH is charged with development of strategic plans for the entire health sector. Since even with this contribution there were complaints, the study proposed a new model called CALF which according to a simulation, if adopted by MOH, strategic planning would contribute 87% to effectiveness in procurement of medicals. PMID:28299158
Cohen, Justin M; Singh, Inder; O'Brien, Megan E
2008-01-01
Background An accurate forecast of global demand is essential to stabilize the market for artemisinin-based combination therapy (ACT) and to ensure access to high-quality, life-saving medications at the lowest sustainable prices by avoiding underproduction and excessive overproduction, each of which can have negative consequences for the availability of affordable drugs. A robust forecast requires an understanding of the resources available to support procurement of these relatively expensive antimalarials, in particular from the Global Fund, at present the single largest source of ACT funding. Methods Predictive regression models estimating the timing and rate of disbursements from the Global Fund to recipient countries for each malaria grant were derived using a repeated split-sample procedure intended to avoid over-fitting. Predictions were compared against actual disbursements in a group of validation grants, and forecasts of ACT procurement extrapolated from disbursement predictions were evaluated against actual procurement in two sub-Saharan countries. Results Quarterly forecasts were correlated highly with actual smoothed disbursement rates (r = 0.987, p < 0.0001). Additionally, predicted ACT procurement, extrapolated from forecasted disbursements, was correlated strongly with actual ACT procurement supported by two grants from the Global Fund's first (r = 0.945, p < 0.0001) and fourth (r = 0.938, p < 0.0001) funding rounds. Conclusion This analysis derived predictive regression models that successfully forecasted disbursement patterning for individual Global Fund malaria grants. These results indicate the utility of this approach for demand forecasting of ACT and, potentially, for other commodities procured using funding from the Global Fund. Further validation using data from other countries in different regions and environments will be necessary to confirm its generalizability. PMID:18831742
Reforming antiretroviral price negotiations and public procurement: the Mexican experience.
Adesina, Adebiyi; Wirtz, Veronika J; Dratler, Sandra
2013-01-01
Since antiretroviral (ARV) medicines represent one of the most costly components of therapy for HIV in middle-income countries, ensuring their efficient procurement is highly relevant. In 2008, Mexico created a national commission for the negotiation of ARV prices to achieve price reductions for their public HIV treatment programmes. The objective of this study is to assess the immediate impact of the creation of the Mexican Commission for Price Negotiation on ARV prices and expenditures. A longitudinal retrospective analysis of procurement prices, volumes and type of the most commonly prescribed ARVs procured by the two largest providers of HIV/AIDS care in Mexico between 2004 and 2009 was carried out. These analyses were combined with 26 semi-structured key informant interviews to identify changes in the procurement process. Prices for ARVs dropped by an average of 38% after the first round of negotiations, indicating that the Commission was successful in price negotiations. However, when compared with other upper-middle-income countries, Mexico continues to pay an average of six times more for ARVs. The Commission's negotiations were successful in achieving lower ARV prices. However, price reduction in upper-middle-income countries suggests that the price decrease in Mexico cannot be entirely attributed to the Commission's first round of negotiations. In addition, key informants identified inefficiencies in the forecasting and procurement processes possibly affecting the efficiency of the negotiation process. A comprehensive approach to improving efficiency in the purchasing and delivery of ARVs is necessary, including a better clarification in the roles and responsibilities of the Commission, improving supply data collection and integration in forecasting and procurement, and the creation of a support system to monitor and provide feedback on patient ARV use.
A Study on Strategic Planning and Procurement of Medicals in Uganda's Regional Referral Hospitals.
Masembe, Ishak Kamaradi
2016-12-31
This study was an analysis of the effect of strategic planning on procurement of medicals in Uganda's regional referral hospitals (RRH's). Medicals were defined as essential medicines, medical devices and medical equipment. The Ministry of Health (MOH) has been carrying out strategic planning for the last 15 years via the Health Sector Strategic Plans. Their assumption was that strategic planning would translate to strategic procurement and consequently, availability of medicals in the RRH's. However, despite the existence of these plans, there have been many complaints about expired drugs and shortages in RRH's. For this purpose, a third variable was important because it served the role of mediation. A questionnaire was used to obtain information on perceptions of 206 respondents who were selected using simple random sampling. 8 key informant interviews were held, 2 in each RRH. 4 Focus Group Discussions were held, 1 for each RRH, and between 5 and 8 staff took part as discussants for approximately three hours. The findings suggested that strategic planning was affected by funding to approximately 34% while the relationship between funding and procurement was 35%. The direct relationship between strategic planning and procurement was 18%. However when the total causal effect was computed it turned out that strategic planning and the related variable of funding contributed 77% to procurement of medicals under the current hierarchical model where MOH is charged with development of strategic plans for the entire health sector. Since even with this contribution there were complaints, the study proposed a new model called CALF which according to a simulation, if adopted by MOH, strategic planning would contribute 87% to effectiveness in procurement of medicals.
Sørensen, Nina N; Tetens, Inge; Løje, Hanne; Lassen, Anne D
2016-12-01
To measure the effect of organic food conversion projects on the percentage of organic food used in Danish public kitchens participating in the Danish Organic Action Plan 2020. The current longitudinal study was based on measurements of organic food percentages in Danish public kitchens before and after kitchen employees participated in conversion projects. Public kitchens participating in the nine organic food conversion projects under the Danish Organic Action Plan 2020, initiated during autumn 2012 and spring 2013 and completed in summer 2015. A total of 622 public kitchens. The average (median) increase in organic food percentage from baseline to follow-up was 24 percentage points (P<0·001) during an overall median follow-up period of 1·5 years. When analysing data according to public kitchen type, the increase remained significant for seven out of eight kitchens. Furthermore, the proportion of public kitchens eligible for the Organic Cuisine Label in either silver (60-90 % organic food procurement) or gold (90-100 % organic food procurement) level doubled from 31 % to 62 %, respectively, during the conversion period. Conversion project curriculum mostly included elements of 'theory', 'menu planning', 'network' and 'Organic Cuisine Label method' to ensure successful implementation. The study reports significant increases in the level of organic food procurement among public kitchens participating in the Danish Organic Action Plan 2020. Recommendations for future organic conversion projects include adding key curriculum components to the project's educational content and measuring changes in organic food percentage to increase the chances of successful implementation.
Carter, Timothy; Bodzin, Adam S; Hirose, Hitoshi; West, Sharon; Hasz, Richard; Maley, Warren R; Cavarocchi, Nicholas C
2014-07-01
Extracorporeal membrane oxygenation has become rescue therapy for adults with overwhelming cardiac and/or respiratory failure. Not all patients are saved, creating a new cohort of potential organ donors. This study examines the outcomes of liver and kidney allografts procured from donors on extracorporeal membrane oxygenation (ECMO). A retrospective review was conducted through the local organ procurement organization. Donors on ECMO prior to notification were classified into donation after brain death (DBD) and donation after cardiac death (DCD). We compared short-term outcome data against published standards. Between 1995 and 2012, 97 organs were procured from 41 donors supported on ECMO. There were 68 kidneys donated, 51 were transplanted and 17 discarded. Excluding extended criteria donors, 29 DBD and 13 DCD kidneys were transplanted from donors supported on ECMO. Delayed graft function occurred in 34% of DBD kidneys and 38% of DCD kidneys. Kidney allograft survival at one yr was 93%. Twenty-four livers were procured, nine discarded, and 15 transplanted. Ninety-three percent of liver transplant recipients were alive with graft function at one yr. Donation after brain death kidneys procured from donors on ECMO perform similarly to non-ECMO organs with regard to delayed graft function (DGF), one-yr graft survival and function. Livers from ECMO donors have a higher discard rate than non-ECMO donors, but function similarly at six months and one yr. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Air Defense Initiative (ADI) Clutter Model
1998-04-01
Pusey, P. N., 1976 , "A Model for Non-Rayleigh Sea Echo," IEEE AP- 24 , No.6, November 197 6 James, W. J., 1961, The Effect of the Weather in Eastern...system procurement. RADC has been involved in the development of clutter models for system procurements for many years. Between 1976 and 1979, RADC...performed measurements and suggested clutter models for the SEEK IGLOO ( 1976 ) and the SEEK FROST (1978-9) programs. Since 1980, current clutter models
Liver Procurement for Orthotopic Transplantation: An Analysis of the Pittsburgh Experience
Van Thiel, David H.; Schade, Robert R.; Hakala, Thomas R.; Starzl, Thomas E.; Denny, Donald
2010-01-01
The incidence of prospective organ donors in the United States and the techniques which are to used to guarantee their optimal use after identification are analyzed. Attitudes of the public and health professionals toward organ donation are discussed. The organization of the Pittsburgh Organ Procurement Agency and its relationship to other such agencies is described. Finally, the presently used techniques of liver salvaging and preservation are outlined. PMID:6363261
2016-03-01
capabilities to cover the FMS supporting activities. 14. SUBJECT TERMS Republic of Turkey , Security Assistance, Foreign Military Sales, Direct...Agency IPO International Program Office JSUMMAT Joint United States Military Mission for Aid to Turkey LOA Letter of Acceptance LOAD Letter of...employment, capital formation, as well as research and development (Perfilio, 2007, p. 3). As a North Atlantic Treaty Organization (NATO) member, Turkey
Warranties in Weapon System Procurement: An Analysis of Practice and Theory.
1987-04-01
MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF SIANDARDS 1963 A fD r ILE GW cm AD-A190 933 IDA PAPER P-2024 WARRANTIES IN WEAPON SYSTEM PROCUREMENT...EPWT Essential Performance Warranty Test FAR Federal Acquisition Regulation GCS Guidance Control Section GLD Ground Laser Locator Designator GS General...Service IDA Institute for Defense Analyses I&L Installations and Logistics IPT Initial Production Test LDR Laser Designator Rangefimder MLDT Mean
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
Cost containment through pharmaceutical procurement: a Caribbean case study.
Huff-Rousselle, M; Burnett, F
1996-01-01
This article discusses the potential for health sector cost containment in developing countries through improved pharmaceutical procurement. By describing the specific example of the Eastern Caribbean Drug Service (ECDS), which provides a pooled procurement service to nine ministries of health in the small island nations of the Caribbean, it examines the elements of the procurement operation that allowed ECDS to reduce unit costs for pharmaceuticals by over 50 per cent during its first procurement cycle. The analysis of ECDS considers: (1) political will, institutional alliances, and the creation of a public sector monopsony; (2) pooling demand; (3) restricted international tendering and the pharmaceutical industry; (4) estimating demand and supplier guarantees; (5) reducing variety and increasing volume through standardizing pack sizes, dosage forms and strengths; (6) generic bidding and therapeutic alternative bidding; (7) mode of transport from foreign suppliers; (8) financing mechanisms, including choice of currency, foreign exchange, and terms of payment; (9) market conditions and crafting and enforcing supplier contracts; and, (10) the adjudication process, including consideration of suppliers' past performance, precision requirements in the manufacturing process, number of products awarded to suppliers, and issues of judgment. The authors consider the relevance of this agency's experience to other developing countries by providing a blueprint that can be adopted or modified to suit other situations.
Azzopardi-Muscat, Natasha; Schroder-Bäck, Peter; Brand, Helmut
2017-01-01
The Joint Procurement Agreement (JPA) is an innovative instrument for multi-country procurement of medical countermeasures against cross-border health threats. This paper aims to assess its potential performance. A literature review was conducted to identify key features of successful joint procurement programmes. Documentary analysis and a key informants' interview were carried out to analyse the European Union (EU) JPA. Ownership, equity, transparency, stable central financing, standardisation, flexibility and gradual development were identified as important prerequisites for successful establishment of multi-country joint procurement programmes in the literature while security of supply, favourable prices, reduction of operational costs and administrative burden and creation of professional expert networks were identified as desirable outcomes. The EU JPA appears to fulfil the criteria of ownership, transparency, equity, flexibility and gradual development. Standardisation is only partly fulfilled and central EU level financing is not provided. Security of supply is an important outcome for all EU Member States (MS). Price savings, reduction in administrative burden and creation of professional networks may be particularly attractive for the smaller MS. The JPA has the potential to increase health system collaboration and efficiency at EU level provided that the incentives for sustained commitment of larger MS are sufficiently attractive.
Annual Procurement Report, Fiscal Year 1997
NASA Technical Reports Server (NTRS)
1997-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1997. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during Fiscal Year 1997. However, these larger procurements accounted for only 43 percent of the total actions. Procurement action, as used in this report means contractual actions to obtain supplies, services or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or termination's to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract. The Annual Procurement Report is also available via the internet on the Procurement homepage.
78 FR 46239 - Designations of Chief Acquisition Officer and Senior Procurement Executive
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Designations of Chief Acquisition Officer and Senior Procurement Executive and Delegation of Procurement... No. FR-5701-D-01] Designations of Chief Acquisition Officer and Senior Procurement Executive AGENCY... Procurement Officer as the Senior Procurement Executive. DATES: Effective Date: July 24, 2013. FOR FURTHER...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
Stopping Illicit Procurement: Lessons from Global Finance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hund, Gretchen; Kurzrok, Andrew J.
Government regulators and the financial sector cooperate to combat money laundering and terrorist financing. This information-sharing relationship is built upon a strong legislative foundation and effective operational procedures. As with money-laundering and terrorist financing, halting the illicit procurement of dual-use commodities requires close coordination between government and industry. However, many of the legal and operational features present in financial threat cooperation do not exist in the export control realm. This article analyzes the applicability of financial industry cooperative measures to nonproliferation.
Cost Analysis for Dual Source Weapon Procurement
1983-10-01
no change in the unit production cost of weapon systems. The theoretical foundation of a production rate impact on cost is closely related to - he...Yet the impact on procure- aent costs of these rate changes is not generally under- stood. Empirical studies in recent years have documented cases where...slbpe of th:. rate/cost curve.- Using this equation, Kratz, et al., reported the pric- reac- tions attributable to a change in production rate. Of th? 11
Procurement Fraud: A Knowledge-Level Analysis of Contracting Personnel
2014-12-01
experience, or how many years the paliicipant has been in the contracting career field. The scores ranged from 56.8 percent for patt icipants with 11 to 20...23. Percentage ofResponses to Internal Control Perception Question c. Procurement Fraud Scheme The survey patt icipants were asked to which...survey patt icipants’ average scores on the knowledge questions held a negative con elation with their yeru·s of experience, with the exception of
A Case Study Analysis of a System Acquisition by a Field Activity
1980-06-01
following personnel assisted in the preparation of this procurement plan: Mr. T. L. M. Wiegant Ms. J. Weaver Commander D. M. Chism Lieutenant Commander M...AUTHORITY (SSA). Rear Admiral V.T. EDSALL, SC, USN 2.2 PROCURING CONTRACTING OFFICER (PCO). Cofmander David M. CHISM , SC, USN (Regional Contracting...California, 1977. 5. Brozen, Dr. Yale, "Commentary," Barron’s National Business and Financial Weekly, 25 January 1971, p. 1. 6. Chism , CDR David, NISTARS
Dependence and power in healthcare equipment supply chains.
de Jong, Jurriaan L; Benton, W C
2018-03-05
Most healthcare organizations (HCOs) engage Group Purchasing Organizations (GPOs) as an outsourcing strategy to secure their supplies and materials. When an HCO outsources the procurement function to a GPO, this GPO will directly interact with the HCO's supplier on the HCO's behalf. This study investigates how an HCO's dependence on a GPO affects supply chain relationships and power in the healthcare medical equipment supply chain. Hypotheses are tested through factor analysis and structural equation modeling, using primary survey data from HCO procurement managers. An HCO's dependence on a GPO is found to be positively associated with a GPO's reliance on mediated power, but, surprisingly, negatively associated with a GPO's mediated power. Furthermore, analysis indicates that an HCO's dependence on a GPO is positively associated with an HCO's dependence on a GPO-contracted Original Equipment Manufacturer (OEM). HCO reliance on GPOs may lead to a buyer's dependence trap, where HCOs are increasingly dependent on GPOs and OEMs. Implications for HCO procurement managers and recommended steps for mitigation are offered. Power-dependence relationships in the medical equipment supply chain are not consistent with relationships in other, more traditional, supply chains. While dependence in a supply chain relationship typically leads to an increase in reliance on mediated power, GPO-dependent HCOs instead perceive a decrease in GPO mediated power. Furthermore, HCOs that rely on procurement service from GPOs are increasingly dependent on the OEMs.
Vilhelmsson, Andreas; Mulinari, Shai
2017-08-09
Little is known about how pharmaceutical companies lobby authorities or experts regarding procurement or the use of vaccines and antivirals. This paper investigates how members of Denmark's pandemic planning committee experienced lobbying efforts by Roche, manufacturer of Tamiflu, the antiviral that was stockpiled before the 2009 A(H1N1) pandemic. Analysis of interviews with six of seven members of the Danish core pandemic committee, supplemented with documentary analysis. We sought to identify (1) arguments and (2) tactics used in lobbying, and to characterize interviewees' views on the impact of (3) lobbying and (4) scientific evidence on the decision to stockpile Tamiflu. Roche lobbied directly (in its own name) and through a seemingly independent third party. Roche used two arguments: (1) the procurement agreement had to be signed quickly because the drug would be delivered on a first-come, first-served basis and (2) Denmark was especially vulnerable to an influenza crisis because it had smaller Tamiflu stocks than other countries. Most interviewees suspected that lobbying had an impact on Tamiflu procurement. Our study highlights risks posed by pharmaceutical lobbying. Arguments and tactics deployed by Roche are likely to be repeated whenever many countries are negotiating drug procurements in a monopolistic market. © The Author 2017. Published by Oxford University Press on behalf of Faculty of Public Health.
2 CFR 215.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
10 CFR 600.145 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
2 CFR 215.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
10 CFR 600.145 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
10 CFR 600.145 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
2 CFR 215.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
Cost analysis of Navy acquisition alternatives for the NAVSTAR Global Positioning System
NASA Astrophysics Data System (ADS)
Darcy, T. F.; Smith, G. P.
1982-12-01
This research analyzes the life cycle cost (LCC) of the Navy's current and two hypothetical procurement alternatives for NAVSTAR Global Positioning System (GPS) user equipment. Costs are derived by the ARINC Research Corporation ACBEN cost estimating system. Data presentation is in a comparative format describing individual alternative LCC and differential costs between alternatives. Sensitivity analysis explores the impact receiver-processor unit (RPU) first unit production cost has on individual alternative LCC, as well as cost differentials between each alternative. Several benefits are discussed that might provide sufficient cost savings and/or system effectiveness improvements to warrant a procurement strategy other than the existing proposal.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Document outlines the Federal Energy Management Program's standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers.
Shugalev, N P
1983-01-01
A study was made of the functional significance of GABA-ergic structures of the substantia nigra (SN) and the caudate nucleus (CN) and their role in food-procuring behaviour of cats. Analysis was made of behavioral and EEG-effects of local GABA and the GABA antagonist, picrotoxin, microinjections into the studied brain structures. Stimulation of the GABA-ergic structures of the SN produced a sedative effect and depression of the cat food-procuring behaviour. Effects of stimulation of the CN GABA-ergic structures were to a great degree reverse. The conclusion has been made that GABA-ergic structures of the SN and the CN play different roles in controlling the CN inhibitory influence upon food-procuring behaviour.
Jallier, Vincent; Guyondet, Christophe; Provent, Adeline; Laillou, Arnaud; Soekirman; Moench-Pfanner, Regina
2013-06-01
Access to high-grade micronutrients is a recurring challenge that often threatens the long-term sustainability of food fortification programs. To assess the efficiency of the Global Alliance for Improved Nutrition (GAIN) Premix Facility in procuring quality, affordable vitamin A for fortification of edible oil in Indonesia. A global approach to procurement of standard items was used by combining volumes across various demand streams in order to reduce the total cost of acquisition through economies of scale. The GAIN Premix Facility undertook a detailed analysis of vitamin A requirements across its existing customer base, which served as a basis for developing a reliable demand forecast. A consolidated, competitive tender was launched that resulted in the setting up of a long-term commercial agreement with the selected supplier to lock in the most competitive price for a given period of time. The direct benefit to oil manufacturers of fortifying with vitamin A is that the cost of fortification went down significantly compared with prices they would have been offered had they ordered vitamin A individually. In Indonesia, this consolidated procurement approach has allowed a 14.5% decrease in the unit price of vitamin A. The GAIN Premix Facility demonstrated its effectiveness in acting as a global procurement platform by aggregating demand across different customers and leveraging improved prices through increased volumes. Building on the success of this effort, the GAIN Premix Facility is replicating this global approach for procurement of other standard items being procured across fortification programs worldwide.
NASA procurement report, FY 1992
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.
International overview of hospital procurement.
Ferrier, Maud; Lariviere, David; Laurent, Claire; Roque, Eric
2011-01-01
This article was written by four French hospital director students at the Ecole des Hautes Etudes en Santé Publique (EHESP-School of Public Health) from a study conducted jointly with students at the Grenoble School of Management to present an international overview of hospital procurement methods in ten countries. An analysis of these methods showed that there was a general trend towards group purchasing, with some common aims in terms of costs and performance and some differences in legislation (competition), size of the public sector and centralization or decentralization.
Standard spacecraft economic analysis. Volume 2: Findings and conclusions
NASA Technical Reports Server (NTRS)
Harris, E. D.; Large, J. P.
1976-01-01
The comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle were studied in two phases. In the first phase, a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and an Air Force standard spacecraft design were considered. The second phase dealt with additional procurement options using an upgraded version of an existing NASA design. The results of both phases are discussed.
2016-06-01
several changes that may prove to be consequential. B. Funding Climates The amount appropriated to DoD each year for procurement over the period FY...important to realize that the turns in the funds appropriated for procurement are a lagging indicator of a change in budget climate . Funding and...each of the events identified to signal major and sustained changes in the defense funding climate , which in fact they did. Analysis of surrounding
NASA procurement report, FY 1993
NASA Technical Reports Server (NTRS)
1993-01-01
Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contract to the cost of an annual procurement approach, using a present value analysis. Do not award the multiyear contract unless the analysis shows that the multiyear contract will result in the lower cost (10 U...
Application of Kanban System on a hospital pharmacy.
Mitka, Eleftheria
2015-01-01
This is a brief overview of principles, views and methods, of the Kanban System for the pharmacy of a general hospital. The main goal is the reduction of stores managed by the pharmacy, as well as improvement of the mode of operation. Solutions to problems, such as inadequate storage space, the delay in serving patients or clinics and the expiration of various pharmaceutical formulations, stored for so long time, are provided. The philosophy behind the Kanban procurement System and specifically its applicability to a pharmacy underperforming in terms of efficiency, in Greece, are described. Based on the analysis of stock requirement, item stock prices and demand, it is concluded that a significant percentage of the stocked drugs can be procured using the Kanban System. Significant cost savings and operational advantages following the Kanban System will take place. The challenging endeavor is the analysis, design and application of a system that supports the proposed procurement method. Hospital pharmacies in Greece and in other countries that face an economic crisis may largely benefit after using the Kanban System.
Method for procuring specific populations of viable human prostate cells for research.
Fischer, A H; Philips, A; Taysavang, P; McKenney, J K; Amin, M B
2001-04-01
A wider range of research can be conducted on viable tissue samples than on fixed or frozen samples. A major obstacle to studying viable prostate tissue samples is the inability to accurately identify cancer on direct examination of unembedded tissue. We used a dissecting microscope to identify cancer in unfixed prostate tissue samples stained on the cut surface with 0.5% aqueous toluidine blue. We measured the diagnostic accuracy of this technique in 25 consecutive prostatectomies, determined the viability of procured samples, and estimated the effect on final pathologic assessment. Both surfaces of a 3- to 5-mm thick cross-section taken midway between base and apex of the prostate were examined. A 4-mm punch biopsy was directed to one benign and one malignant area when clearly present. The dissecting microscope allowed clearcut recognition of carcinoma in 17 of the 25 cross-sections, and carcinoma was confirmed in all 17 (100%). In 8 of 25 cases, no procurement was attempted because no carcinoma was evident in the one cross-section studied. Twenty of 25 cross-sections were adequate for benign tissue procurement; five of the cross-sections were not suitable for procurement because of the presence of extensive carcinoma or atrophy. Seventeen of the 20 were accurately diagnosed as benign (85%); one showed pseudohyperplastic adenocarcinoma, one showed focal high-grade prostatic intraepithelial neoplasia, and one showed urothelial carcinoma in situ. Prostatic epithelium obtained with the technique remains viable and can be separated from stroma. The dissecting microscope technique appears to facilitate rather than interfere with accurate pathologic assessment: extraprostatic extension or positive margins were correctly identified during tissue procurement in three cases. The procedure takes only about 30 minutes.
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...
22 CFR 201.23 - Procurement under private sector procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...
Summary data on all NASA procurement actions
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
75 FR 13262 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...: Additions to and deletions from the Procurement List. SUMMARY: This action adds to the Procurement List a... severe disabilities, and deletes from the Procurement List services previously furnished by such agencies... Severely Disabled published notices of proposed additions to the Procurement List. After consideration of...
75 FR 49481 - Procurement List; Additions and Deletion
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...
Public perspectives on biospecimen procurement: what biorepositories should consider.
L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M
2013-06-01
Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.
Human factors in the Naval Air Systems Command: Computer based training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seamster, T.L.; Snyder, C.E.; Terranova, M.
1988-01-01
Military standards applied to the private sector contracts have a substantial effect on the quality of Computer Based Training (CBT) systems procured for the Naval Air Systems Command. This study evaluated standards regulating the following areas in CBT development and procurement: interactive training systems, cognitive task analysis, and CBT hardware. The objective was to develop some high-level recommendations for evolving standards that will govern the next generation of CBT systems. One of the key recommendations is that there be an integration of the instructional systems development, the human factors engineering, and the software development standards. Recommendations were also made formore » task analysis and CBT hardware standards. (9 refs., 3 figs.)« less
77 FR 11071 - Procurement List; Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies... People Who Are Blind or Severely Disabled published notices of proposed additions to the Procurement List...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
Cresswell, Kathrin M; Lee, Lisa; Slee, Ann; Coleman, Jamie; Bates, David W; Sheikh, Aziz
2015-01-01
Objectives We studied vendor perspectives about potentially transferable lessons for implementing organisations and national strategies surrounding the procurement of Computerised Physician Order Entry (CPOE)/Clinical Decision Support (CDS) systems in English hospitals. Setting Data were collected from digitally audio-recorded discussions from a series of CPOE/CDS vendor round-table discussions held in September 2014 in the UK. Participants Nine participants, representing 6 key vendors operating in the UK, attended. The discussions were transcribed verbatim and thematically analysed. Results Vendors reported a range of challenges surrounding the procurement and contracting processes of CPOE/CDS systems, including hospitals’ inability to adequately assess their own needs and then select a suitable product, rushed procurement and implementation processes that resulted in difficulties in meaningfully engaging with vendors, as well as challenges relating to contracting leading to ambiguities in implementation roles. Consequently, relationships between system vendors and hospitals were often strained, the vendors attributing this to a lack of hospital management's appreciation of the complexities associated with implementation efforts. Future anticipated challenges included issues surrounding the standardisation of data to enable their aggregation across systems for effective secondary uses, and implementation of data exchange with providers outside the hospital. Conclusions Our results indicate that there are significant issues surrounding capacity to procure and optimise CPOE/CDS systems among UK hospitals. There is an urgent need to encourage more synergistic and collaborative working between providers and vendors and for a more centralised support for National Health Service hospitals, which draws on a wider body of experience, including a formalised procurement framework with value-based product specifications. PMID:26503385
75 FR 4784 - Procurement List; Addition
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... Procurement List. SUMMARY: This action adds to the Procurement List a service to be furnished by a nonprofit... Who Are Blind or Severely Disabled published a notice of proposed addition to the Procurement List... Committee has determined that the service listed below is suitable for procurement by the Federal Government...
14 CFR § 1201.400 - NASA procurement program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
22 CFR 1006.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1006.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
34 CFR 85.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 85.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
41 CFR 105-72.504 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services...
41 CFR 105-72.504 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services...
41 CFR 105-72.504 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services...
41 CFR 105-72.504 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services...
38 CFR 49.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement...) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
38 CFR 49.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement...) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
40 CFR 30.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... metric system of measurement. (vi) Preference, to the extent practicable and economically feasible, for... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
38 CFR 49.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement...) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
40 CFR 30.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... metric system of measurement. (vi) Preference, to the extent practicable and economically feasible, for... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
40 CFR 30.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... metric system of measurement. (vi) Preference, to the extent practicable and economically feasible, for... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
38 CFR 49.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement...) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
40 CFR 30.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... metric system of measurement. (vi) Preference, to the extent practicable and economically feasible, for... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
A novel medical information management and decision model for uncertain demand optimization.
Bi, Ya
2015-01-01
Accurately planning the procurement volume is an effective measure for controlling the medicine inventory cost. Due to uncertain demand it is difficult to make accurate decision on procurement volume. As to the biomedicine sensitive to time and season demand, the uncertain demand fitted by the fuzzy mathematics method is obviously better than general random distribution functions. To establish a novel medical information management and decision model for uncertain demand optimization. A novel optimal management and decision model under uncertain demand has been presented based on fuzzy mathematics and a new comprehensive improved particle swarm algorithm. The optimal management and decision model can effectively reduce the medicine inventory cost. The proposed improved particle swarm optimization is a simple and effective algorithm to improve the Fuzzy interference and hence effectively reduce the calculation complexity of the optimal management and decision model. Therefore the new model can be used for accurate decision on procurement volume under uncertain demand.
Bahm, Sarah M; Karkazis, Katrina; Magnus, David
2013-09-01
To identify and analyze existing posthumous sperm procurement (PSP) protocols in order to outline central themes for institutions to consider when developing future policies. Qualitative content analysis. Large academic institutions across the United States. We performed a literature search and contacted 40 institutions to obtain nine full PSP protocols. We then performed a content analysis on these policies to identify major themes and factors to consider when developing a PSP protocol. Presence of a PSP policy. We identified six components of a thorough PSP protocol: Standard of Evidence, Terms of Eligibility, Sperm Designee, Restrictions on Use in Reproduction, Logistics, and Contraindications. We also identified two different approaches to policy structure. In the Limited Role approach, institutions have stricter consent requirements and limit their involvement to the time of procurement. In the Family-Centered approach, substituted judgment is permitted but a mandatory wait period is enforced before sperm use in reproduction. Institutions seeking to implement a PSP protocol will benefit from considering the six major building blocks of a thorough protocol and where they would like to fall on the spectrum from a Limited Role to a Family-Centered approach. Copyright © 2013 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.
Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider
L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura
2013-01-01
Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089
Evans, R W; Orians, C E; Ascher, N L
1992-01-08
To estimate the potential supply of organ donors and to measure the efficiency of organ procurement efforts in the United States. A geographic database has been developed consisting of multiple cause of death and sociodemographic data compiled by the National Center for Health Statistics. All deaths are evaluated as to their potential for organ donation. Two classes of potential donors are identified: class 1 estimates are restricted to causes of death involving significant head trauma only, and class 2 estimates include class 1 estimates as well as deaths in which brain death was less probable. Over 23,000 people are currently awaiting a kidney, heart, liver, heart-lung, pancreas, or lung transplantation. Donor supply is inadequate, and the number of donors remained unchanged at approximately 4000 annually for 1986 through 1989, with a modest 9.1% increase in 1990. Between 6900 and 10,700 potential donors are available annually (eg, 28.5 to 43.7 per million population). Depending on the class of donor considered, organ procurement efforts are between 37% and 59% efficient. Efficiency greatly varies by state and organ procurement organization. Many more organ donors are available than are being accessed through existing organ procurement efforts. Realistically, it may be possible to increase by 80% the number of donors available in the United States (up to 7300 annually). It is conceivable, although unlikely, that the supply of donor organs could achieve a level to meet demand.
13 CFR 121.407 - What are the size procedures for multiple item procurements?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...
13 CFR 127.101 - What type of assistance is available under this part?
Code of Federal Regulations, 2011 CFR
2011-01-01
... ADMINISTRATION WOMEN-OWNED SMALL BUSINESS FEDERAL CONTRACT ASSISTANCE PROCEDURES (Eff. until 2-4-11) General... analysis (including analysis of its own procurement history), that the set-aside would meet all applicable...
32 CFR 32.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... REGULATIONS ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
32 CFR 32.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... REGULATIONS ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
32 CFR 32.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... REGULATIONS ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
28 CFR 70.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER...
28 CFR 70.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER...
28 CFR 70.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER...
32 CFR 32.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... REGULATIONS ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION...
28 CFR 70.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER...
Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A
2010-09-01
Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.
7 CFR 550.47 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 6 2010-01-01 2010-01-01 false Cost and price analysis. 550.47 Section 550.47... OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements Procurement Standards § 550.47 Cost and price analysis. Some form of cost or price analysis shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... analysis provides information on specific service contract actions that were analyzed as part of the FY... analysis at the following link: http://www.usitc.gov/procurement/ . FOR FURTHER INFORMATION CONTACT... INTERNATIONAL TRADE COMMISSION Public Availability of FY 2011 Service Contract Inventory Analysis...
Acquisition-Management Program
NASA Technical Reports Server (NTRS)
Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.
1987-01-01
NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.
Routine recovery: an ethical plan for greatly increasing the supply of transplantable organs.
Spital, Aaron; Taylor, James S
2008-04-01
All current organ procurement policies require some form of consent. Many families refuse to permit organ recovery from a recently deceased relative; therefore, the major cost of requiring consent is the loss of some lives that could have been saved through transplantation. Here, we argue for a much more efficient approach to organ procurement from brain dead individuals - routine recovery of all transplantable organs without consent. Careful analysis of the relevant literature shows that, compared with its competitors, routine recovery has the greatest potential to increase cadaveric organ procurement and save lives while causing very little harm. Furthermore, a recent survey suggests that 30% of the US public would already accept routine recovery even though the respondents were not educated regarding the value of this approach. Patients on the transplant waiting list are dying while organs that could have saved them are being buried or burned because of family refusal to allow posthumous organ procurement. Routine recovery would eliminate this tragic loss of life-saving organs without violating ethical principles. Indeed, we argue that of all the proposals designed to increase the supply of transplantable cadaveric organs, routine recovery is the best.
41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...
1991-12-01
associated with ADP/FIP protests. Navy and Marine Corps contracting agencies w\\ere contacted to determine their current experience in ADP/’FIP contracting...an emphasis on the GSBCA. A protestor has many options in vhich to "avenge" their wrong. A Contracting Officer can therefore expect a variety of...subject to their exclusive procurement authority. The term ADPE and ADP/FIP will be used somewhat loosely. In most cases, the acronyms include
Competition in the economic crisis: Analysis of procurement auctions.
Gugler, Klaus; Weichselbaumer, Michael; Zulehner, Christine
2015-01-01
We study the effects of the recent economic crisis on firms׳ bidding behavior and markups in sealed bid auctions. Using data from Austrian construction procurements, we estimate bidders׳ construction costs within a private value auction model. We find that markups of all bids submitted decrease by 1.5 percentage points in the recent economic crisis, markups of winning bids decrease by 3.3 percentage points. We also find that without the government stimulus package this decrease would have been larger. These two pieces of evidence point to pro-cyclical markups.
43 CFR 12.944 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... Agreements With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Post-Award...
43 CFR 12.944 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... Agreements With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Post-Award...
2 CFR 215.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR...
43 CFR 12.944 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... Agreements With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Post-Award...
2 CFR 215.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR...
43 CFR 12.944 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... Agreements With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Post-Award...
2 CFR 215.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and economically feasible, of products and services dimensioned in the metric system of measurement... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR...
Managing EEE part standardisation and procurement
NASA Astrophysics Data System (ADS)
Serieys, C.; Bensoussan, A.; Petitmangin, A.; Rigaud, M.; Barbaresco, P.; Lyan, C.
2002-12-01
This paper presents the development activities in space components selection and procurement dealing with a new data base tool implemented at Alcatel Space using TransForm softwaa re configurator developed by Techform S.A. Based on TransForm, Access Ingenierie has devv eloped a software product named OLG@DOS which facilitate the part nomenclatures analyses for new equipment design and manufacturing in term of ACCESS data base implementation. Hi-Rel EEE part type technical, production and quality information are collected and compiled usingproduction data base issued from production tools implemented for equipment definition, description and production based on Manufacturing Resource Planning (MRP II Control Open) and Parametric Design Manager (PDM Work Manager). The analysis of any new equipment nomenclature may be conducted through this means for standardisation purpose, cost containment program and management procurement activities as well as preparation of Component reviews as Part Approval Document and Declared Part List validation.
Electrocardiogram transmission - The state of the art.
NASA Technical Reports Server (NTRS)
Firstenberg, A.; Huston, S. W.; Olsen, D. E.; Hahn, P. M.
1971-01-01
A comparative analysis of available clinical EKG telemetry systems was conducted. Although present day electrocardiogram diagnosis requires a high degree of measurement accuracy, there exists wide variations in the performance characteristics of the various telemeters marketed today necessitating careful consideration of specifications prior to procurement. The authors have endeavored to provide the physicians with a clear understanding, in terms of the effects on the electrocardiogram, of the factors he must evaluate in order to ensure high fidelity EKG reproduction. A tabulation of comparative parameter values for each unit obtained from manufacturers' specifications and substantiated by standardized performance tests conducted in our laboratory is presented.
Donor and procurement related issues in vascularized composite allograft transplantation.
McDiarmid, Sue V
2013-12-01
To understand the unique requirements of vascularized composite allograft (VCA) donation and procurement practices and the integral role of the established nationwide organ procurement organizations in organ procurement. The recent issuance of a Final Rule (July 2013) by the United States Secretary of Health that redefines VCAs as organs rather than tissues, opens up the potential to formalize policies and procedures, under the auspices of the Organ Procurement and Transplantation Network, that can improve VCA donation, procurement practices, develop allocation algorithms and provide transparent oversight. Improved VCA donation rates, procurement procedures and broader sharing nationwide of VCA donors will have important implications in advancing the emerging field of VCA transplantation.
General Services Administration Streamlines the Procurement of Construction Services
2010-05-01
successful. The system must be changed to increase performance, and have a sustainable performance measurement system that results in an increase...currently employ, and what is needed to employ a sustainable performance measurement system that has accompanying increase in performance and value
Ohkawara, H; Fukushima, N; Kitagawa, T; Ito, T; Masutani, Y; Sawa, Y
2010-01-01
Although organ procurement has been regulated by The Organ Transplantation Law (brain-dead donors since 1997, donors after cardiac death since 1979), there has been no law or governmental procurement network (except for cornea) in Japan. Since the late 1980s, some university hospitals have developed original banks. Finally, in 2001 guidelines for tissue procurement were established by The Japanese Society of Tissue Transplantation and Japan Tissue Transplant Network (JTTN) to coordinate tissue harvesting. Five tissue banks were joined to the tissue transplant network (skin in one, heart valves in two, and bone in two). As the number of tissue banks is small, each bank cooperates on procurement, but cannot cover the entire country. With regard to skin transplantation, only one skin bank-The Japan Skin Bank Network (JSBN), which is located in Tokyo-has organized skin procurement. Therefore, it has been difficult to procure skin in areas distant from Tokyo, especially around Osaka. In order to improve such a situation, a tissue bank collaborating with the JSBN was established at The Medical Center for Translational Research (MTR), Osaka University Hospital in April 2008. The bank has played a role in skin procurement center in western Japan and supported procurement and preservation at the time of the skin procurement. Between April 2008 and September 2009, the bank participated in eight tissue procurements in the western area. In the future, the bank is planning to procure and preserve pancreatic islets and bones. Moreover, there is a plan to set up an induced pluripotent stem cells center and stem cell bank in MTR. This tissue bank may play a role to increase tissue procurement in Japan, especially in the western area. .
24 CFR 84.84 - Procurement standards.
Code of Federal Regulations, 2011 CFR
2011-04-01
... economically feasible, of products and services dimensioned in the metric system of measurement. (F) Preference... price. (h) Contract administration. A system for contract administration shall be maintained to ensure...
24 CFR 84.84 - Procurement standards.
Code of Federal Regulations, 2012 CFR
2012-04-01
... economically feasible, of products and services dimensioned in the metric system of measurement. (F) Preference... price. (h) Contract administration. A system for contract administration shall be maintained to ensure...
24 CFR 84.84 - Procurement standards.
Code of Federal Regulations, 2014 CFR
2014-04-01
... economically feasible, of products and services dimensioned in the metric system of measurement. (F) Preference... price. (h) Contract administration. A system for contract administration shall be maintained to ensure...
24 CFR 84.84 - Procurement standards.
Code of Federal Regulations, 2013 CFR
2013-04-01
... economically feasible, of products and services dimensioned in the metric system of measurement. (F) Preference... price. (h) Contract administration. A system for contract administration shall be maintained to ensure...
45 CFR 74.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS...
45 CFR 2543.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...
45 CFR 2543.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...
45 CFR 74.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS...
20 CFR 435.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL...
10 CFR 600.144 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other...
10 CFR 600.144 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other...
45 CFR 2543.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...
10 CFR 600.144 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other...
20 CFR 435.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL...
20 CFR 435.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL...
45 CFR 74.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS...
45 CFR 2543.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...
20 CFR 435.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL...
10 CFR 600.144 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other...
45 CFR 74.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS...
1985-09-01
courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management
45 CFR 74.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 1 2011-10-01 2011-10-01 false Cost and price analysis. 74.45 Section 74.45 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE... connection with every procurement action. Price analysis may be accomplished in various ways, including the...
45 CFR 74.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 1 2010-10-01 2010-10-01 false Cost and price analysis. 74.45 Section 74.45 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE... connection with every procurement action. Price analysis may be accomplished in various ways, including the...
Tissue procurement and transplantation: a Tuscany perspective.
Filipponi, F; De Simone, P; Saviozzi, A; Bozzi, G
2008-01-01
Tissue procurement and transplantation are rarely taken into account as indicators of the efficiency of a regional donor procurement network. We present herein a retrospective review on Tuscany tissue procurement activities from 2004 until 2006. In 2003 the Tuscan Regional Government appointed a transplantation service authority to reorganize all regional donation and transplantation activities: the Organizzazione Toscana Trapianti (OTT). The regional tissue procurement network was based on either brain death (BD) and cardiac death (CD) donors under the responsibility of in-hospital transplantation coordinators (IHTCs). From 2004 to 2006, a total of 397 tissue donors were procured in Tuscany, and 4151 tissue transplantations were performed: 2909 skin grafts, 1209 bone grafts, and 33 heart valves. Over the same period, a total of 2116 cornea donors were procured; 4117 corneas were retrieved; 1779 were fit for transplantation, and 1418 were transplanted. Based on our experience, implementation of tissue procurement requires use of BD donors and paramount organizational efforts from IHTCs.
15 CFR 14.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND...
15 CFR 14.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND...
49 CFR 19.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...
22 CFR 518.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...
49 CFR 19.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...
22 CFR 518.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...
15 CFR 14.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND...
15 CFR 14.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... products and services dimensioned in the metric system of measurement. (vi) Preference, to the extent... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND...
22 CFR 518.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...
22 CFR 518.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...
Aycart, Mario A; Alhefzi, Muayyad; Sharma, Gaurav; Krezdorn, Nicco; Bueno, Ericka M; Talbot, Simon G; Carty, Matthew J; Tullius, Stefan G; Pomahac, Bohdan
2017-06-01
Current knowledge of the impact of facial vascularized composite allograft (VCA) procurement on the transplantation outcomes of the concomitantly recovered solid organs is limited to isolated case reports and short-term results. Here we report on a nationwide analysis of facial allograft donor surgery experience and long-term outcomes of the concomitantly recovered solid organs and their recipients. There were 10 facial VCA procurements in organ donors between December 2008 and October 2014. We identified the population of subjects who received solid organs from these 10 donors using the Scientific Registry of Transplant Recipients. We retrospectively reviewed operative characteristics, intraoperative parameters, and postoperative outcomes. Six of 10 donor surgeries were performed at outside institutions, all on brain-dead donors. Mean operative duration for facial VCA recovery was 6.9 hours (range, 4-13.25 hours). A total of 36 solid organs were recovered and transplanted into 35 recipients. Survival rates for kidney and liver recipients were 100% and 90% at a median follow-up of 33 and 27.5 months, respectively (range, 6-72 months). Graft survival rates for kidneys and livers were 15 of 16 (94%) and 9 of 10 (90%), respectively. Recipient and graft survival rates for hearts and lungs were 75% (n = 4) and 100% (n = 3) at mean follow-up time of 14.75 and 16 months, respectively. A liver recipient died at 22 months from unknown causes and a heart recipient died of leukemia at 10 months. Facial VCA procurement does not appear to adversely affect the outcomes of transplant recipients of concomitantly recovered solid organ allografts.
Procurement Procurement The National Renewable Energy Laboratory (NREL) offers numerous procurement source of biofuels. Register Your Small Business NREL welcomes small, disadvantaged, HUBzone, veteran -owned, and women-owned business vendors and subcontractors. Register today
DOT National Transportation Integrated Search
2013-04-01
Established in 1995 as the Florida Vehicle : Procurement Program (FVPP), Florida Transit : Research Inspection Procurement Services (TRIPS) : is a vehicle sourcing and procurement system for : Floridas public transit agencies that integrates : ins...
Applying e-procurement system in the healthcare: the EPOS paradigm
NASA Astrophysics Data System (ADS)
Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis
2010-03-01
One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Cost and price analysis. 2543.45 Section 2543.45... ORGANIZATIONS Post-Award Requirements Property Standards § 2543.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...
22 CFR 226.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Cost and price analysis. 226.45 Section 226.45 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.45 Cost and price analysis. Some...
24 CFR 963.12 - Alternative procurement process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT PUBLIC HOUSING-CONTRACTING WITH RESIDENT-OWNED BUSINESSES Contracting With Resident-Owned Businesses § 963.12 Alternative procurement process. (a) Method of procurement. In contracting with resident-owned businesses, the PHA shall follow the applicable method of procurement as set forth...
36 CFR 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards... in various ways, including the comparison of price quotations submitted, market prices and similar...
36 CFR 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards... in various ways, including the comparison of price quotations submitted, market prices and similar...
36 CFR 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards... in various ways, including the comparison of price quotations submitted, market prices and similar...
Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent
2016-06-01
Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 12 2014-01-01 2013-01-01 true Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
22 CFR 226.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...
76 FR 12016 - Local and Regional Food Aid Procurement Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Local and Regional Food Aid Procurement... field-based projects under the USDA Local and Regional Food Aid Procurement Pilot Project (USDA LRP..., 2011. FOR FURTHER INFORMATION CONTACT: Jamie Fisher, Chief, Local and Regional Procurement, Food...
48 CFR 2401.601-70 - Senior Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Senior Procurement... Authority, and Responsibilities 2401.601-70 Senior Procurement Executive. Unless otherwise designated by the Secretary through a delegation of authority, the Chief Procurement Officer is the Department's Senior...
78 FR 20783 - Designation of Product Categories for Federal Procurement; Withdrawal
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
... Designation of Product Categories for Federal Procurement; Withdrawal AGENCY: Office of Procurement and.... Department of Agriculture (USDA) is withdrawing the final rule ``Designation of Product Categories for... product categories within which biobased products will be afforded Federal procurement preference, was...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Procurement. 203.13 Section 203.13 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS... small businesses, and will be conducted as competitive procurements. Procurements below a value of $2...
48 CFR 702.170-13 - Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement Executive. 702.170-13 Section 702.170-13 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL DEFINITIONS OF WORDS AND TERMS Definitions 702.170-13 Procurement Executive. “Procurement...
10 CFR 436.43 - Procurement planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...
Code of Federal Regulations, 2011 CFR
2011-07-01
... LITIGATION Remedies in Procurement Fraud and Corruption § 516.58 Policies. (a) Procurement fraud and... administrative remedies in significant cases of fraud or corruption relating to Army procurement. (d) The key... of fraud or corruption involving procurement. (g) Coordination on the status and disposition of cases...
Ethics and regulation in organ procurement research.
Ackerman, Terrence F; Winsett, Rebecca P
2002-12-01
This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.
The learning curves in living donor hemiliver graft procurement using small upper midline incision.
Ikegami, Toru; Harimoto, Norifumi; Shimokawa, Masahiro; Yoshizumi, Tomoharu; Uchiyama, Hideaki; Itoh, Shinji; Okabe, Norihisa; Sakata, Kazuhito; Nagatsu, Akihisa; Soejima, Yuji; Maehara, Yoshihiko
2016-12-01
The learning curve for performing living donor hemiliver procurement (LDHP) via small upper midline incision (UMI) has not been determined. Living donors (n=101) who underwent LDHP via UMI were included to investigate the learning curve using cumulative sum analysis. The cumulative sum analysis showed that nine cases for right lobe (case #23) and 19 cases for left lobe (case #32 in the whole series) are needed for stable and acceptable surgical outcomes in LDHP via UMI. The established phase (n=69, since case #33) had a significantly shorter operative time, a smaller incision size, and less blood loss than the previous learning phase (n=32, serial case number up to the last 19th left lobe case). Multivariate analysis showed that the learning phase, high body mass index ≥25 kg/m 2 , and left lobe graft procurement are the factors associated with surgical events including operative blood loss ≥400 mL, operative time ≥300 minutes, or surgical complications ≥Clavien-Dindo grade II. There is an obvious learning curve in performing LDHP via UMI, and 32 cases including both 19 cases for left lobe and nine cases for right lobe are needed for having stable and acceptable surgical outcomes. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Bacillus Calmette-Guérin (BCG) vaccine: A global assessment of demand and supply balance.
Cernuschi, Tania; Malvolti, Stefano; Nickels, Emily; Friede, Martin
2018-01-25
Over the past decade, several countries across all regions, income groups and procurement methods have been unable to secure sufficient BCG vaccine supply. While the frequency of stock-outs has remained rather stable, duration increased in 2014-2015 due to manufacturing issues and attracted the attention of national, regional and global immunization stakeholders. This prompted an in-depth analysis of supply and demand dynamics aiming to characterize supply risks. This analysis is unique as it provides a global picture, where previous analyses have focused on a portion of the market procuring through UN entities. Through literature review, supplier interviews, appraisal of shortages, stock-outs and historical procurement data, and through demand forecasting, this analysis shows an important increase in global capacity in 2017: supply is sufficient to meet forecasted BCG vaccine demand and possibly buffer market shocks. Nevertheless, risks remain mainly due to supply concentration and limited investment in production process improvements, as well as inflexibility in demand. Identification of these market risks will allow implementation of risk-mitigating interventions in three areas: (1) enhancing information sharing between major global health actors, countries and suppliers, (2) identifying interests and incentives to expand product registration and investment in the BCG manufacturing process, and (3) working with countries for tighter vaccine management. Copyright © 2017. Published by Elsevier Ltd.
Fuller, Christopher; Savage, Joan; Cookson, Barry; Hayward, Andrew; Cooper, Ben; Duckworth, Georgia; Michie, Susan; Murray, Miranda; Jeanes, Annette; Roberts, J; Teare, Louise; Charlett, Andre
2012-01-01
Objective To evaluate the impact of the Cleanyourhands campaign on rates of hospital procurement of alcohol hand rub and soap, report trends in selected healthcare associated infections, and investigate the association between infections and procurement. Design Prospective, ecological, interrupted time series study from 1 July 2004 to 30 June 2008. Setting 187 acute trusts in England and Wales. Intervention Installation of bedside alcohol hand rub, materials promoting hand hygiene and institutional engagement, regular hand hygiene audits, rolled out nationally from 1 December 2004. Main outcome measures Quarterly (that is, every three months) rates for each trust of hospital procurement of alcohol hand rub and liquid soap; Staphylococcus aureus bacteraemia (meticillin resistant (MRSA) and meticillin sensitive (MSSA)) and Clostridium difficile infection for each trust. Associations between procurement and infection rates assessed by mixed effect Poisson regression model (which also accounted for effect of bed occupancy, hospital type, and timing of other national interventions targeting these infections). Results Combined procurement of soap and alcohol hand rub tripled from 21.8 to 59.8 mL per patient bed day; procurement rose in association with each phase of the campaign. Rates fell for MRSA bacteraemia (1.88 to 0.91 cases per 10 000 bed days) and C difficile infection (16.75 to 9.49 cases). MSSA bacteraemia rates did not fall. Increased procurement of soap was independently associated with reduced C difficile infection throughout the study (adjusted incidence rate ratio for 1 mL increase per patient bed day 0.993, 95% confidence interval 0.990 to 0.996; P<0.0001). Increased procurement of alcohol hand rub was independently associated with reduced MRSA bacteraemia, but only in the last four quarters of the study (0.990, 0.985 to 0.995; P<0.0001). Publication of the Health Act 2006 was strongly associated with reduced MRSA bacteraemia (0.86, 0.75 to 0.98; P=0.02) and C difficile infection (0.75, 0.67 to 0.84; P<0.0001). Trust visits by Department of Health improvement teams were also associated with reduced MRSA bacteraemia (0.91, 0.83 to 0.99; P=0.03) and C difficile infection (0.80, 0.71 to 0.90; P=0.01), for at least two quarters after each visit. Conclusions The Cleanyourhands campaign was associated with sustained increases in hospital procurement of alcohol rub and soap, which the results suggest has an important role in reducing rates of some healthcare associated infections. National interventions for infection control undertaken in the context of a high profile political drive can reduce selected healthcare associated infections. PMID:22556101
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
7 CFR 3019.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
7 CFR 3019.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
7 CFR 3019.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
41 CFR 101-28.306-6 - Sensitive items.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 28-STORAGE AND DISTRIBUTION... accountable item of personal property. Each customer activity shall take all appropriate measures necessary to... Government use. ...
Code of Federal Regulations, 2010 CFR
2010-04-01
... more economical purchase. Where appropriate, an analysis must be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To foster... negotiated prices are consistent with Federal cost principles (see § 437.22). Grantees may reference their...
7 CFR 1778.22 - Planning development and procurement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development and procurement. 1778.22 Section 1778.22 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... Planning development and procurement. Planning development and procurement for grants made under this part...
Procurement Career Management Handbook.
ERIC Educational Resources Information Center
Department of the Treasury, Washington, DC.
This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 3 2014-07-01 2014-07-01 false Procurement. 553.11 Section 553.11 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES ARMY NATIONAL CEMETERIES § 553.11 Procurement. Cemetery supplies and services will be procured in...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
Proceedings: 1990 EPRI gas turbine procurement seminar
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, B.L.; Miller, M.N.
1991-06-01
This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less
Survey of U.S. Organ Procurement Organizations Regarding Pediatric Organ Donor Management.
Ream, Robert S; Armbrecht, Eric S
2016-10-01
To describe the current practice of pediatric organ donor management in the United States for donors declared dead based upon neurologic criteria. The study directs particular attention to how pediatric donors are defined, the use of donor management guidelines, the use of donor management goals, and the involvement of pediatric critical care or transplantation expertise. Cross-sectional observational study using a web-based survey and follow-up telephone interview with respondents from U.S. organ procurement organizations. The study also incorporated organ procurement organization-specific data on organ yield for the 4-year period (2010-2013) preceding the study. The 58 U.S. organ procurement organizations. Respondents chosen by each organ procurement organization. None. All 58 U.S. organ procurement organizations participated in the study. Fifty-two respondents (90%) indicated that their organ procurement organization distinguished pediatric from adult donors resulting in 28 unique pediatric definitions. Thirty-nine organ procurement organizations utilized some form of written pediatric management guidelines, and 27 (47%) maintained pediatric donor management goals; compliance was infrequently monitored for both guidelines (28%) and goals (33%). A pediatric intensivist was always or usually involved in pediatric donor management at 47 organ procurement organizations (81%); transplant/organ recovery surgeons were always or usually involved at 12 organ procurement organizations (21%). There was an increase in the number of organs transplanted per donor among donors 11-17 years old for organ procurement organizations that used donor management goals for the duration of the period studied (p < 0.01). There was also an increase in the ratio of observed/expected organs transplanted among donors of 0-10 years old for organ procurement organizations that always or usually consulted a transplant/organ recovery surgeon (p = 0.02) although this did not reach our threshold for statistical significance.. There is little consensus among organ procurement organizations regarding the definition of "pediatric" during organ donor management. Most organ procurement organizations employ written pediatric guidelines and use pediatric intensive care physicians for assistance in managing these donors. There is a positive association between the use of donor management goals and organ yield among pediatric donors in the 11- to 17-year age group.
Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis
2016-08-08
We know little about how procurement of a high-risk medical device (HRMD) affects clinical practice and outcomes. In health systems in high-income countries, and specifically those that maintain a national arthroplasty registry, procurement decisions are frequently guided by long-term clinical results, with the goal of ensuring at least standard quality of HRMDs. But in countries like Mexico, decision-making is often dominated by lowest acquisition price. We set out to study the impact of procurement for orthopaedic HRMDs on clinical procedures and outcomes. We based our qualitative study on 59 in-depth interviews with stakeholders from Mexico, Switzerland, Germany, and UK: orthopaedic specialists, government officials, other experts, and social security system managers or administrators. We took a healthcare delivery approach to capturing and comparing factors that affected the regulations of HRMDs and procurement processes, and to understanding connections between procurement and clinical practice. Our findings demonstrate for procurement processes that the three European countries compared to Mexico don't have similar concerns with regards to their procurement processes. Deficiencies of procurement regulations and practices identified from representatives in Mexico were almost absent in European countries. We identified three areas of deficiency: 1) HRMD regulations based on insufficiently robust clinical evidence (mainly noted by European countries); 2) Follow-up on Health Technology Assessments is inadequate (noted by Mexico) and methodology not always good enough (noted by European countries); and, 3) Lowest-acquisition price often guides procurement decisions and thus may not align with needs of clinical procedures (noted by Mexico and some European countries). Procurement processes for orthopaedic HRMDs may have an impact on clinical procedures and outcomes. A favourable approach is one where orthopaedic specialists are parties to the procurement process, and post-market surveillance data informs decision-making. Actors in the procurement process can improve their impact on clinical procedures and outcomes by developing specific strategies that better align the needs of both, procurement and clinical procedures.
Procurement of a more efficient railroad system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detmold, P.J.
An analysis of how new technology penetrates the railroad system and who initiates the changes suggests ways for improving the procedures. The author identifies a six-step process in transport development which includes invention, innovation, information dissemination, and persuasion. He concludes that poor economic justification and the lack of capital explain the low rate of equipment replacement. The nature of the market and the need for standardized specification appear to influence procurement changes, but both suppliers and transport operators must be convinced of the need for change. The Advanced Train Control Systems Project illustrates how the initiation process works.
Standard spacecraft economic analysis. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Harris, E. D.; Large, J. P.
1976-01-01
A study of the comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle during the 1980-1990 time period is reviewed. The first phase of the study considered a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and a Air Force standard spacecraft design. The results were briefed to a joint NASA/Air Force audience on July 11, 1976. The second phase considered additional procurement options using an upgraded version of an existing NASA design. The results of both phases are summarized.
The co-existence of life and death for the perioperative nurse.
Perrin, Karen; Jones, Barbara; Winkelman, Cecelia
2013-10-01
Death and life co-exist in organ procurement surgery; untimely death for one provides hope for continued life for others. Drawing from interactionist theory, the impact of personal and environmental forces and functions specific to organ procurement surgery were examined. Seven nurses (6 women, 1 man aged 34-58 years) were provided with an opportunity to describe their experiences. Three core themes emerged from the qualitative analysis of the interviews: existential issues, coping strategies, and support for each other. Nurses spoke of ways in which they contribute to this challenging work and draw on inner resources.
Toward a Framework for Dynamic Service Binding in E-Procurement
NASA Astrophysics Data System (ADS)
Ashoori, Maryam; Eze, Benjamin; Benyoucef, Morad; Peyton, Liam
In an online environment, an E-Procurement process should be able to react and adapt in near real-time to changes in suppliers, requirements, and regulations. WS-BPEL is an emerging standard for process automation, but is oriented towards design-time binding of services. This missing issue can be resolved through designing an extension to WS-BPEL to support automation of flexible e-Procurement processes. Our proposed framework will support dynamic acquisition of procurement services from different suppliers dealing with changing procurement requirements. The proposed framework is illustrated by applying it to health care where different health insurance providers could be involved to procure the medication for patients.
Potential fraudulent behaviors in e-procurement implementation in Indonesia
NASA Astrophysics Data System (ADS)
Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.
2017-03-01
Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.
Terzaghi, Clara; Longo, Alessia; Legnani, Claudio; Bernasconi, Davide Paolo; Faré, Maristella
2015-03-01
The aim of this study was to analyze factors contributing to bacteriological contamination of bone and tendon allograft. Between 2008 and 2011, 2,778 bone and tendon allografts obtained from 196 organ and tissue donors or tissue donors only were retrospectively analysed. Several variables were taken into account: donor type (organ and tissue donors vs. tissue donor), cause of death, time interval between death and tissue procurement, duration of the procurement procedure, type of allografts, number of team members, number of trainees members, associated surgical procedures, positivity to haemoculture, type of procurement. The overall incidence of graft contamination was 23 %. The cause of death, the procurement time, the duration of procurement, the associated surgical procedures were not associated with increased risk of contamination. Significant effect on contamination incidence was observed for the number of staff members performing the procurement. In addition, our study substantiated significantly higher contamination rate among bone allografts than from tendon grafts. According to these observations, in order to minimize the contamination rate of procured musculoskeletal allografts, we recommend appropriate donor selection, use of standard sterile techniques, immediate packaging of each allograft to reduce graft exposure. Allograft procurement should be performed by a small surgical team.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
41 CFR 101-26.501-5 - Procurement time schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
77 FR 65500 - Extension of Suspension and Debarment Exclusions, Grants and Cooperative Agreements
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-29
... Government procurement. William P. McNally, Assistant Administrator for Procurement. Accordingly, 2 CFR Part... proposes to extend coverage of nonprocurement suspension and debarment to all-tier procurement and non-procurement actions under all grants and cooperative agreements. DATES: Interested parties should submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Proposed rule. SUMMARY: The Office of Procurement...
78 FR 70022 - Procurement List; Proposed Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
.... ACTION: Proposed Additions to and Deletions from the Procurement List. SUMMARY: The Committee is proposing to add products and a service to the Procurement List that will be furnished by nonprofit agencies... the Procurement List for production by the nonprofit agencies listed: Products Kit, Paint...
77 FR 60969 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... Procurement List. Notice Correction: On 9/28/2012 (77 FR 59595), the Committee for Purchase From People Who Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... and services to the Procurement List that will be furnished by nonprofit agencies employing persons...
75 FR 1355 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
...: Additions to and deletions from Procurement List. SUMMARY: This action adds to the Procurement List services... disabilities, and deletes from the Procurement List products and services previously furnished by such agencies... [email protected] . SUPPLEMENTARY INFORMATION: Additions On 11/6/2009 (74 FR 57453-57454), the...
76 FR 78248 - Procurement List; Addition and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
.... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...
24 CFR 84.84 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Procurement standards. 84.84... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Use of Lump Sum Grants § 84.84 Procurement standards. (a) Purpose of procurement standards. Paragraphs (b) through (i) of this section set forth...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...
7 CFR 235.9 - Procurement and property management standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Federal authority that has proper jurisdiction. (c) Procurement procedure. The State agency may use its... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
36 CFR § 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-07-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
Report on the Installation and Preparedness of a Protochips Fusion in-situ Heating Holder for TEM
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edmondson, Philip D.
2017-03-01
This brief report documents the procurement and installation of a Protochips Fusion (formerly Aduro) high-temperature, high stability transmission electron microscopy (TEM) specimen holder that allows for the high spatial resolution characterization of material specimens at high temperature in situ of an electron microscope. This specimen holder was specifically procured for use with The FEI Talos F200X Scanning/Transmission Electron Microscope (STEM) in Oak Ridge National Laboratory’s (ORNL’s) Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Protochips Fusion holder will enable high-resolution structural and chemical analysis of irradiated materials at high temperature, becoming a unique capability worldwide, and would encourage high-qualitymore » in situ experiments to be conducted on irradiated materials.« less
Optimum profit model considering production, quality and sale problem
NASA Astrophysics Data System (ADS)
Chen, Chung-Ho; Lu, Chih-Lun
2011-12-01
Chen and Liu ['Procurement Strategies in the Presence of the Spot Market-an Analytical Framework', Production Planning and Control, 18, 297-309] presented the optimum profit model between the producers and the purchasers for the supply chain system with a pure procurement policy. However, their model with a simple manufacturing cost did not consider the used cost of the customer. In this study, the modified Chen and Liu's model will be addressed for determining the optimum product and process parameters. The authors propose a modified Chen and Liu's model under the two-stage screening procedure. The surrogate variable having a high correlation with the measurable quality characteristic will be directly measured in the first stage. The measurable quality characteristic will be directly measured in the second stage when the product decision cannot be determined in the first stage. The used cost of the customer will be measured by adopting Taguchi's quadratic quality loss function. The optimum purchaser's order quantity, the producer's product price and the process quality level will be jointly determined by maximising the expected profit between them.
The impact of Pulpwood Rail Freight Costs on the Minnesota-Wisconsin Pulpwood Market
David C. Lothner
1976-01-01
Transportation costs affect the marketing and utilization of pulpwood. Their impact on the procurement and utilization of pulpwood often prove difficult to measure because deriving an average annual measure of the transportation cost is difficult. This note, by means of a simple index method for measuring regional interstate pulpwood rail freight costs, illustrates...
41 CFR 101-26.507-2 - Procurement time schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement...) Agreement on Government Procurement (GPA). Although the rule now opens up Government procurement to the... 48 CFR Parts 225 and 252 Government procurement. Kortnee Stewart, Editor, Defense Acquisition...
10 CFR 1021.216 - Procurement, financial assistance, and joint ventures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... a decision on proposals and will include: (1) A brief discussion of the purpose of the procurement... 10 Energy 4 2010-01-01 2010-01-01 false Procurement, financial assistance, and joint ventures... POLICY ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.216 Procurement, financial assistance, and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 2 2010-10-01 2010-10-01 false Payment of independent organ procurement... SKILLED NURSING FACILITIES Payment for End-Stage Renal Disease (ESRD) Services and Organ Procurement Costs § 413.200 Payment of independent organ procurement organizations and histocompatibility laboratories. (a...
7 CFR 225.17 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...
77 FR 37659 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... additions to the procurement list. SUMMARY: The Committee is proposing to add products and services to the...- 598-5067 and 1670-01-598-5071 to its Procurement List. The Coverage statement associated with this... connection with the products and services proposed for addition to the Procurement List. Comments on this...
32 CFR 37.1330 - Procurement contract.
Code of Federal Regulations, 2010 CFR
2010-07-01
... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...
10 CFR 603.1300 - Procurement contract.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...
31 CFR 19.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Are any procurement contracts....220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2...
29 CFR 98.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 1 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...
29 CFR 98.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...
29 CFR 1471.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 4 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...
29 CFR 1471.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 4 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...
48 CFR 2406.304-70 - Approval of the justification-field procurements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Other Than Full and Open Competition 2406.304-70 Approval of the justification—field procurements. (a) The justification for other than full and open competition for field procurements shall be approved in... justification-field procurements. 2406.304-70 Section 2406.304-70 Federal Acquisition Regulations System...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Procurement. 627.420 Section 627.420... PROGRAMS UNDER TITLES I, II, AND III OF THE ACT Administrative Standards § 627.420 Procurement. (a) General. (1) For purposes of this section, the term procurement means the process which leads to any award of...
ERIC Educational Resources Information Center
Owusu-Manu, D.; Badu, E.; Edwards, D. J.
2011-01-01
Procurement in the corporate world is increasingly complex, multi-faceted and interdisciplinary. This paper explores existing knowledge specifications relating to procurement management competencies and proposes a new procurement management competency framework (PMCF) and a competency-based postgraduate programme for postgraduate students in…
Information Requirements for a Procurement Management Information System.
1975-08-01
Management Information System is...described and some justification for this type of procurement management information system is presented. A literature search was made to determine...information systems. If information requirements are correctly identified and satisfied by a procurement management information system , contract administration and procurement management can be
Antier, Clémentine; Kumar, Salil; Bhagwat, Sadhana; Sankar, Rajan
2014-01-01
Integrated Child Development Services in India through its supplementary nutrition programme covers over 100 million children, pregnant and lactating women across the country. Providing a hot cooked meal each day to children aged between 3-6 years and a take-home ration to children aged between 6-36 months, pregnant and lactating women, the Integrated Child Development Services faces a monumental task to deliver this component of services of desired quality and regularity at scale. From intermediaries or contractors who acted as agents for procuring and distributing food to procurement directly from large food manufacturers to using women groups as food producers, different State Governments have adopted a variety of strategies to procure and distribute food, especially the take-home ration. India's Supreme Court, through its directive of 2004, encouraged the Government to engage women's groups for the production of the supplementary food. This study was conducted to determine the operational performance, economic sustainability and social impact of a decentralised production model for India's Supplementary Nutrition Program, in which women groups run smallscale industrialised units. Data were collected through observation, interviews and group discussions with key stakeholders. Operational performance was analysed through standard performance indicators that measured consistency in production, compliance with quality standards and distribution regularity. Assessment of the economic viability included cost structure analysis, five-year projections, and financial ratios. Social impact was assessed using a qualitative approach. The pilot unit has demonstrated its operational performance and cost-efficiency. More data is needed to evaluate the scalability and sustainability of this decentralised model.
Code of Federal Regulations, 2010 CFR
2010-01-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 1273.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 1470.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-01-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 24.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-01-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 3016.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-10-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 92.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 43.22). Grantees may reference their own cost principles that...
41 CFR 105-71.136 - Procurement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To foster... consistent with Federal cost principles (see § 105-71.122). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 33.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 1207.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-10-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 12.62). Grantees may reference their own cost principles that...
45 CFR 2541.360 - Procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 2541.220). Grantees may reference their own cost principles...
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.145 Cost and..., including the comparison of price quotations submitted, market prices and similar indicia, together with...
14 CFR § 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260... ways, including the comparison of price quotations submitted, market prices and similar indicia...
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.145 Cost and..., including the comparison of price quotations submitted, market prices and similar indicia, together with...
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.145 Cost and..., including the comparison of price quotations submitted, market prices and similar indicia, together with...
22 CFR 201.22 - Procurement under public sector procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...
22 CFR 201.22 - Procurement under public sector procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...
22 CFR 201.22 - Procurement under public sector procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...
22 CFR 201.22 - Procurement under public sector procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
...-restrictive manner and in sufficient detail to permit maximum response from prospective suppliers. The metric system of measurements shall be used for specifications unless USAID determines in writing that such use...
45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... feasibility of the proposed effort and provide for the conduct of a requirements analysis study which address... indicate how the results of the requirements analysis study will be incorporated into the proposed system... address requirements analysis, program design, procurement and project management; and, a description of...
NRC assessment of improvements in licensee procurement and dedication programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grimes, B.K.; Potapovs, U.; Campbell, L.L.
1991-01-01
The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's responsemore » to NUMARC procurement initiatives.« less
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
Greening Operations Management: An Online Sustainable Procurement Course for Practitioners
ERIC Educational Resources Information Center
Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian
2009-01-01
In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…
Code of Federal Regulations, 2010 CFR
2010-01-01
... unrestricted procurement for Certificate of Competency purposes? 121.409 Section 121.409 Business Credit and... an unrestricted procurement for Certificate of Competency purposes? For the purpose of receiving a Certificate of Competency in an unrestricted procurement, the applicable size standard is that corresponding...
The NGST Science Instrument Procurement Plan
NASA Astrophysics Data System (ADS)
Greenhouse, M. A.; NGST Project Office Team
1998-12-01
We display the top level plan for procurement of science instruments for NGST. The procurement process and time line schedule leading to a NASA AO solicitation for flight instruments is presented and discussed. This procurement schedule includes important milestones that will be reached during 1999 and that are of potential interest to NGST instrument offerors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...
22 CFR 208.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
22 CFR 208.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
22 CFR 1508.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
5 CFR 919.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Are any procurement contracts included as...) Covered Transactions § 919.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency...
A Blueprint for Effective and Adaptable School District Procurement
ERIC Educational Resources Information Center
Maas, Tricia; Lake, Robin
2015-01-01
In public education, procurement reform has been all but ignored in policy discussions and procurement policies have remained virtually untouched. But the high price of ignoring procurement is becoming clear to people trying to reform education on the ground. Often involving long, cumbersome processes and risk-averse central office cultures,…
eProcurement: The Technology of Smart Shopping
ERIC Educational Resources Information Center
Briggs, Linda L.
2006-01-01
This article talks about eProcurement and examines why school districts are so slow to make the transition. Despite the billions of dollars that flow from schools each year in procurement spending, most K-12 districts in the United States, especially smaller ones, persist in using paperbased procurement models in which supplies are identified in…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-13
... Guidance on Government-Wide Debarment and Suspension (Non-procurement) AGENCY: U.S. Agency for...-procurement), currently located in Part 208 of Title 22 of the Code of Federal Regulations (CFR), and [email protected] , fax (202) 567-4695 FOR FURTHER INFORMATION CONTACT: Melita E. Yearwood, Procurement Analyst...
48 CFR 217.172 - Multiyear contracts for supplies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of units to be procured through the contract; and (2) In the case of a contract for procurement of aircraft, the budget request includes full funding of procurement funds for production beyond advance procurement activities of aircraft units to be produced in the fiscal year covered by the budget. (d)(1) The...
Donor management parameters and organ yield: single center results.
Marshall, George Ryne; Mangus, Richard S; Powelson, John A; Fridell, Jonathan A; Kubal, Chandrashekhar A; Tector, A Joseph
2014-09-01
Management of organ donors in the intensive care unit is an emerging subject in critical care and transplantation. This study evaluates organ yield outcomes for a large number of patients managed by the Indiana Organ Procurement Organization. This is a retrospective review of intensive care unit records from 2008-2012. Donor demographic information and seven donor management parameters (DMP) were recorded at admission, consent, 12 h after consent, and before procurement. Three study groups were created: donors meeting 0-3, 4, or 5-7 DMP. Active donor Organ Procurement Organization management began at consent; so, data analysis focuses on the 12-h postconsent time point. Outcomes included organs transplanted per donor (OTPD) and transplantation of individual solid organs. Complete records for 499 patients were reviewed. Organ yield was 1415 organs of 3992 possible (35%). At 12 h, donors meeting more DMP had more OTPD: 2.2 (0-3) versus 3.0 (4) versus 3.5 (5-7) (P < 0.01). Aggregate DMP met was significantly associated with transplantation of every organ except intestine. Oxygen tension, vasopressor use, and central venous pressure were the most frequent independent predictors of organ usage. There were significantly more organs transplanted for donors meeting all three of these parameters (4.5 versus 2.7, P < 0.01). Initial DMP met does not appear to be a significant prognostic factor for OTPD. Aggregate DMP is associated with transplantation rates for most organs, with analysis of individual parameters suggesting that appropriate management of oxygenation, volume status, and vasopressor use could lead to more organs procured per donor. Copyright © 2014 Elsevier Inc. All rights reserved.
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
Anker, Ashley E; Feeley, Thomas Hugh
2011-07-01
The present study provides an in-depth examination of the messages used by organ procurement coordinators (OPCs) in shaping familial requests for organ donation. OPCs (N = 102), recruited from a national sample of 16 organ procurement organizations, participated in a structured interview designed to uncover the communication strategies used in obtaining familial consent for donation. Analysis of interviews indicates OPCs' messages cover 4 domain areas. Specifically, OPCs report use of messages intended to (a) provide education, (b) discuss the benefits to donation, (c) learn about potential donor families, and (d) persuade families to engage in donation. Within the 4 domain areas, OPCs report use of 15 specific messages (e.g., "positively framing the donor," "social proof," "discuss the benefit of donation to grieving") in requesting consent. The present study provides a detailed examination of strategies and offers recommendations for using message strategies to explore the effectiveness of the consent process from the perspective of OPCs in approaching donor families.
Kim, Mi-Kyung
2009-01-01
We examine whether the current regulatory regime instituted in South Korea and the United States would have prevented Hwang's potential transgressions in oocyte procurement for somatic cell nuclear transfer, we compare the general aspects and oversight framework of the Bioethics and Biosafety Act in South Korea and the US National Academies' Guidelines for Human Embryonic Stem Cell Research, and apply the relevant provisions and recommendations to each transgression. We conclude that the Act would institute centralized oversight under governmental auspices while the Guidelines recommend politically-independent, decentralized oversight bodies including a special review body for human embryonic stem cell research at an institutional level and that the Guidelines would have provided more vigorous protection for the women who had undergone oocyte procurement for Hwang's research than the Act. We also suggest additional regulations to protect those who provide oocytes for research in South Korea.
NASA Astrophysics Data System (ADS)
Tabrizi, Babak H.; Ghaderi, Seyed Farid
2016-09-01
Simultaneous planning of project scheduling and material procurement can improve the project execution costs. Hence, the issue has been addressed here by a mixed-integer programming model. The proposed model facilitates the procurement decisions by accounting for a number of suppliers offering a distinctive discount formula from which to purchase the required materials. It is aimed at developing schedules with the best net present value regarding the obtained benefit and costs of the project execution. A genetic algorithm is applied to deal with the problem, in addition to a modified version equipped with a variable neighbourhood search. The underlying factors of the solution methods are calibrated by the Taguchi method to obtain robust solutions. The performance of the aforementioned methods is compared for different problem sizes, in which the utilized local search proved efficient. Finally, a sensitivity analysis is carried out to check the effect of inflation on the objective function value.
Critical factors for sustainable food procurement in zoological collections.
Hanson, Jonathan H
2015-01-01
Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.
Ewen, Margaret; Al Sakit, Maisa; Saadeh, Rawan; Laing, Richard; Vialle-Valentin, Catherine; Seita, Akihiro; Bunders, Joske
2014-01-01
The United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA), the main primary healthcare provider for 4.9 million Palestinian refugees, spent USD18.3 million on essential medicines dispensed free-of-charge through clinics in five areas of operation ('fields'): Gaza, Jordan, Lebanon, Syria, and the West Bank (2010). Faced with budget contraints and an increasing demand for medicines to treat chronic conditions, the objective of our study was to assess UNRWA's medicine procurement prices to see if savings could be possible. In July 2011, data was collected from UNRWA headquarters in Jordan. Price analyses focused on the top 80 medicines by value, accounting for 93% of pharmaceutical expenditure from the General Fund, with comparisons to international, regional and national references. Prices were also compared for the few medicines procured both through UNRWA's central tender (centrally) and by the fields directly (locally). Central procurement prices did not differ markedly from reference prices: median ratios of UNRWA prices to Management Sciences for Health's International Drug Price Indicator Guide, Jordan's Joint Procurement Department, Gulf Cooperation Council, and IDA Foundation bulk packs were 0.99, 1.00, 0.98 and 1.12 respectively. Applying the lowest comparator price to five comparatively higher priced medicines would yield savings of USD1.4 million. Local procurements were generally less cost-effective than central tender procurement, with notable differences across fields and medicines. Overall, UNRWA's procurement prices were competitive despite the relatively small quantities procured. Regular monitoring of procurement prices and quantities is needed in order to make informed decisions. Our evaluation also underscores the heavy burden of antidiabetic medicines and antimicrobials on UNRWA procurement expenditure.
Shrestha, Mina; Moles, Rebekah; Ranjit, Eurek; Chaar, Betty
2018-01-01
Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines "the Basel Statements". We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors' prescriptions, which were heavily influenced by pharmaceutical companies' marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics.
Ranjit, Eurek
2018-01-01
Background Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines “the Basel Statements”. Method We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Results Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors’ prescriptions, which were heavily influenced by pharmaceutical companies’ marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Conclusions Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics. PMID:29401474
Benchmarking organ procurement organizations: a national study.
Ozcan, Y A; Begun, J W; McKinney, M M
1999-01-01
OBJECTIVE: An exploratory examination of the technical efficiency of organ procurement organizations (OPOs) relative to optimal patterns of production in the population of OPOs in the United States. DATA SOURCES: A composite data set with the OPO as the unit of analysis, constructed from a 1995 national survey of OPOs (n = 64), plus secondary data from the Association of Organ Procurement Organizations and the United Network for Organ Sharing. STUDY DESIGN: The study uses data envelopment analysis (DEA) to evaluate the technical efficiency of all OPOs. PRINCIPAL FINDINGS: Overall, six of the 22 larger OPOs (27 percent) are classified as inefficient, while 23 of the 42 smaller OPOs (55 percent) are classified as inefficient. Efficient OPOs recover significantly more kidneys and extrarenal organs; have higher operating expenses; and have more referrals, donors, extrarenal transplants, and kidney transplants. The quantities of hospital development personnel and other personnel, and formalization of hospital development activities in both small and large OPOs, do not significantly differ. CONCLUSIONS: Indications that larger OPOs are able to operate more efficiently relative to their peers suggest that smaller OPOs are more likely to benefit from technical assistance. More detailed information on the activities of OPO staff would help pinpoint activities that can increase OPO efficiency and referrals, and potentially improve outcomes for large numbers of patients awaiting transplants. PMID:10536974
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... contracts will not adequately serve the end-use purpose. GSA will notify the requesting agency in writing of... in which the requisitioner is located. GSA will either arrange for procurement of the items or...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...
ERIC Educational Resources Information Center
Federal Library Committee, Washington, DC.
The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…
Determinants of Non-Compliance of Public Procurement Regulations in Kenyan Secondary Schools
ERIC Educational Resources Information Center
Migosi, Joash; Ombuki, Charles; Ombuki, Kennedy N.; Evusa, Zablon
2013-01-01
Kenya's public procurement and disposal Act of 2005 sets out clear rules and procedures for public procurement entities to follow; however this does not seem to be the case. This study sought to examine determinants of Non-compliance to the Public Procurement Regulations in Kenyan Secondary Schools. The study adopted a descriptive survey research.…
41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...
1986-06-01
financial reporting in Republic of Korea Army (ROKA) procurement. A discussion of the nature of the ROKA procurement system and two alternatives to historical cost financial statements are presented. The concepts, methods and procedures of the historical cost/constant dollars financial statements are described. The proposal for current cost/constant dollars financial statements is presented and emphasis is given to the description of four problems in existing ROKA procurement due to using inadequate accounting information. Keywords: Cost accounting, Procurement, Current
BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement
2015-01-01
This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518
Cresswell, Kathrin M; Slee, Ann; Coleman, Jamie; Williams, Robin; Bates, David W; Sheikh, Aziz
2013-01-01
There is a pressing need to understand the challenges surrounding procurement of and business case development for hospital electronic prescribing systems, and to identify possible strategies to enhance the efficiency of these processes in order to assist strategic decision making. We organized eight multi-disciplinary round-table discussions in the United Kingdom. Participants included policy makers, representatives from hospitals, system developers, academics, and patients. Each discussion was digitally audio-recorded, transcribed verbatim and, together with accompanying field notes, analyzed thematically with NVivo9. We drew on data from 17 participants (approximately eight per roundtable), six hours of discussion, and 15 pages of field notes. Key challenges included silo planning with systems not being considered as part of an integrated organizational information technology strategy, lack of opportunity for interactions between customers and potential suppliers, lack of support for hospitals in choosing appropriate systems, difficulty of balancing structured planning with flexibility, and the on-going challenge of distinguishing "wants" and aspirations from organizational "needs". Development of business cases for major investments in information technology does not take place in an organizational vacuum. Building on previously identified potentially transferable dimensions to the development and execution of business cases surrounding measurements of costs/benefits and risk management, we have identified additional components relevant to ePrescribing systems. These include: considerations surrounding strategic context, case for change and objectives, future service requirements and options appraisal, capital and revenue implications, timescale and deliverability, and risk analysis and management.
A new funding opportunity in support of the National Cancer Institute’s Clinical Proteomic Tumor Analysis Consortium (CPTAC) seeks to prospectively procure tumor samples, collected for proteomics investigation.
Trippoli, Sabrina; Caccese, Erminia; Marinai, Claudio; Messori, Andrea
2018-03-01
In the acute ischemic stroke, endovascular devices have shown promising clinical results and are also likely to represent value for money, as several modeling studies have shown. Pharmacoeconomic evaluations in this field, however, have little impact on the procurement of these devices. The present study explored how complex pharmacoeconomic models that evaluate effectiveness and cost can be incorporated into the in-hospital procurement of thrombectomy devices. As regards clinical modeling, we extracted outcomes at three months from randomized trials conducted for four thrombectomy devices, and we projected long-term results using standard Markov modeling. In estimating QALYs, the same model was run for the four devices. As regards economic modeling, we firstly estimated for each device the net monetary benefit (NMB) per patient (threshold = $60,000 per QALY); then, we simulated a competitive tender across the four products by determining the tender-based score (on a 0-to-100 scale). Prices of individual devices were obtained from manufacturers. Extensive sensitivity testing was applied to our analyses. For the four devices (Solitaire, Trevo, Penumbra, Solumbra), QALYs were 1.86, 1.52, 1,79, 1.35, NMB was $101,824, $83,546, $101,923, $69,440, and tender-based scores were 99.70, 43.43, 100, 0, respectively. Sensitivity analysis confirmed findings from base-case. Our results indicate that, in the field of thrombectomy devices, incorporating the typical tools of cost-effectiveness into the processes of tenders and procurement is feasible. Bridging the methodology of cost-effectiveness with the every-day practice of in-hospital procurement can contribute to maximizing the health returns that are generated by in-hospital expenditures for medical devices. Copyright © 2018 Elsevier B.V. All rights reserved.
ERIC Educational Resources Information Center
Zhou, Kai-Ge; Wu, Zhi-Fan; Sun, Xiao-Sheng
2017-01-01
Health communication and behavior intervention are main measures adopted in health education. Behavior intervention among these measures is the direct one to affect individual and group behaviors. Patients demand more than health information communication, but rely on health intervention service and related products. This essay starts from…
The procurement of NHS dental services--a guide.
Jones, C L; Rooney, E
2009-05-23
This paper gives an overview of the strategic background for procurement of NHS primary care dental services and an outline of the processes involved in procurement. The main aim is to bring procurement to the attention of a wider audience of dental practitioners and provide advice for potential primary care dental service providers. The move towards local procurement of healthcare services, including primary care dental services, has been shaped by a number of strategic Government publications and is supported by law. In line with other public bodies, the NHS is subject to the European Union and international rules regarding procurement and awarding contracts. Primary Care Trust (PCT) Dental Service Commissioners have to ensure that their procurement strategy is transparent and non-discriminatory so that all providers have an equal opportunity to compete for contracts. In order to successfully tender for future service provision contracts, dental practitioners not only need to be aware of the process of procurement and its associated legal requirements. It is also important that they have a grasp of the expectations of PCTs. Commissioning services via procurement is set to become more commonplace and it is likely, in time, that competition for some contracts will increase in intensity. The importance of researching proposals thoroughly and adopting a professional, businesslike approach to tendering cannot be understated as this maximises chance of success in the new commissioning environment.
Decision Analysis Techniques for Adult Learners: Application to Leadership
ERIC Educational Resources Information Center
Toosi, Farah
2017-01-01
Most decision analysis techniques are not taught at higher education institutions. Leaders, project managers and procurement agents in industry have strong technical knowledge, and it is crucial for them to apply this knowledge at the right time to make critical decisions. There are uncertainties, problems, and risks involved in business…
78 FR 7821 - Public Availability of Railroad Retirement Board FY 2012 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
.../files/omb/procurement/memo/service-contract-inventory-guidance.pdf . The Railroad Retirement Board has... analysis of its selected special interest functions from the FY 2012 Service Contract inventory, and finally (4) the analysis report on its FY 2011 Service Contract Inventory special interest functions, on...
Berkeley Lab - Materials Sciences Division
MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Planning Procurement and Property Proposals & Finance Templates Travel Procurement and Property This
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
7 CFR 226.22 - Procurement standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... affirmative action in support of women's business enterprises. (g) All procurement transactions, regardless of... history of a procurement. These records shall include, but are not necessarily limited to information...
24 CFR 943.150 - What procurement standards apply to a PHA's joint venture partner?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What procurement standards apply to... Subsidiaries, Affiliates, Joint Ventures in Public Housing § 943.150 What procurement standards apply to a PHA..., accordingly, is not required to comply with part 84 or part 85 of this title in its procurement of goods and...
NASA Astrophysics Data System (ADS)
Morel de Westgaver, Eric; van Beekhuizen, Pieter; Fiorilli, Stefano M.
2007-02-01
Space projects are marked by their high technologies and their lengthy development and operations. The procurement process is a critical element that must adapt to a changing industrial landscape and new methods and tools, such as electronic procurement. ESA will host an international symposium in May [2007] to bring all the major players together.
The model and moral justification for organ procurement in Japan.
Bagheri, Alireza; Shoji, Shin'ichi
2005-01-01
Organ replacement therapy is a part of medical practice in today's world and many countries have adopted the required guidelines and regulations. Establishing the basis on which organs can be removed, is still one of the most controversial issues of health policy making in the debate. The critical disparity between supply and demand in organ replacement therapy, even with the existence of social acceptance and organ transplantation law, turns attention towards the importance of an appropriate model of organ procurement. This model should be able to expand the donor pool and increase the organ retrieval rate by converting potential donors to actual ones. In Japan the organ transplantation law which was enacted in 1997 allows organ procurement from brain death as well as non-heart beating cadavers according to restricted conditions. One such condition includes the necessity of both the donor's and the family's written consent. Under current organ procurement policy, organs from only 29 brain death cases have been so far procured. In this paper after examining the current organ procurement system in Japan and the moral justifications behind different organ procurement models we conclude that the Japanese system does not clearly fall into one of the popular organ procurement models.
Cost effective nuclear commercial grade dedication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maletz, J.J.; Marston, M.J.
1991-01-01
This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less
42 CFR 486.342 - Condition: Requesting consent.
Code of Federal Regulations, 2010 CFR
2010-10-01
....342 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION CONDITIONS FOR COVERAGE OF SPECIALIZED SERVICES FURNISHED BY... Organizations Organ Procurement Organization Process Performance Measures § 486.342 Condition: Requesting...
22 CFR 201.22 - Procurement under public sector procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... procurement. Purchasing by brand or trade name or by a restrictive specification (proprietary procurement) may... by operating personnel, can be achieved through standardizing on a particular brand; (2...
Code of Federal Regulations, 2012 CFR
2012-04-01
.... (1) For purposes of this section, the term procurement means the process which leads to any award of... shall maintain records sufficient to detail the significant history of a procurement. These records...
41 CFR 101-26.501-3 - Consolidated purchase program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT..., purchased in the aggregate by group to the extent practical. These procurements are designed to obtain the...
13 CFR 125.15 - What requirements must an SDVO SBC meet to submit an offer on a contract?
Code of Federal Regulations, 2010 CFR
2010-01-01
... corresponding to the NAICS code assigned to the contract, provided: (A) For a procurement having a revenue-based... to the contract; or (B) For a procurement having an employee-based size standard, the procurement... specific contract: (1) It is an SDVO SBC; (2) It is small under the NAICS code assigned to the procurement...