Verification testing of the Atlantic Ultraviolet Megatron M250 system was conducted over a 48-day period from 11/01/01 to 12/18/01. The feedwater to the ultraviolet (UV) unit during the testing was effluent from the Otay Water Treatment Plant (OWTP), a conventional plant with fl...