Sample records for micrographics facility building

  1. PREVAIL: latest electron optics results

    NASA Astrophysics Data System (ADS)

    Pfeiffer, Hans C.; Golladay, Steven D.; Gordon, Michael S.; Kendall, Rodney A.; Lieberman, Jon E.; Rockrohr, James D.; Stickel, Werner; Yamaguchi, Takeshi; Okamoto, Kazuya; Umemoto, Takaaki; Shimizu, Hiroyasu; Kojima, Shinichi; Hamashima, Muneki

    2002-07-01

    The PREVAIL electron optics subsystem developed by IBM has been installed at Nikon's facility in Kumagaya, Japan, for integration into the Nikon commercial EPL stepper. The cornerstone of the electron optics design is the Curvilinear Variable Axis Lens (CVAL) technique originally demonstrated with a proof of concept system. This paper presents the latest experimental results obtained with the electron optical subsystem at Nikon's facility. The results include micrographs illustrating proper CVAL operation through the spatial resolution achieved over the entire optical field of view. They also include data on the most critical issue of the EPL exposure approach: subfield stitching. The methodology of distortion correction will be described and both micrographs and metrology data of stitched subfields will be presented. This paper represents a progress report of the IBM/Nikon alliance activity on EPL.

  2. Using digital colour to increase the realistic appearance of SEM micrographs of bloodstains.

    PubMed

    Hortolà, Policarp

    2010-10-01

    Although in the scientific-research literature the micrographs from scanning electron microscopes (SEMs) are usually displayed in greyscale, the potential of colour resources provided by the SEM-coupled image-acquiring systems and, subsidiarily, by image-manipulation free softwares deserves be explored as a tool for colouring SEM micrographs of bloodstains. After acquiring greyscale SEM micrographs of a (dark red to the naked eye) human blood smear on grey chert, they were manually obtained in red tone using both the SEM-coupled image-acquiring system and an image-manipulation free software, as well as they were automatically generated in thermal tone using the SEM-coupled system. Red images obtained by the SEM-coupled system demonstrated lower visual-discrimination capability than the other coloured images, whereas those in red generated by the free software rendered better magnitude of scopic information than the red images generated by the SEM-coupled system. Thermal-tone images, although were further from the real sample colour than the red ones, not only increased their realistic appearance over the greyscale images, but also yielded the best visual-discrimination capability among all the coloured SEM micrographs, and fairly enhanced the relief effect of the SEM micrographs over both the greyscale and the red images. The application of digital colour by means of the facilities provided by an SEM-coupled image-acquiring system or, when required, by an image-manipulation free software provides a user-friendly, quick and inexpensive way of obtaining coloured SEM micrographs of bloodstains, avoiding to do sophisticated, time-consuming colouring procedures. Although this work was focused on bloodstains, well probably other monochromatic or quasi-monochromatic samples are also susceptible of increasing their realistic appearance by colouring them using the simple methods utilized in this study.

  3. Generating 3D and 3D-like animations of strongly uneven surface microareas of bloodstains from small series of partially out-of-focus digital SEM micrographs.

    PubMed

    Hortolà, Policarp

    2010-01-01

    When dealing with microscopic still images of some kinds of samples, the out-of-focus problem represents a particularly serious limiting factor for the subsequent generation of fully sharp 3D animations. In order to produce fully-focused 3D animations of strongly uneven surface microareas, a vertical stack of six digital secondary-electron SEM micrographs of a human bloodstain microarea was acquired. Afterwards, single combined images were generated using a macrophotography and light microscope image post-processing software. Subsequently, 3D animations of texture and topography were obtained in different formats using a combination of software tools. Finally, a 3D-like animation of a texture-topography composite was obtained in different formats using another combination of software tools. By one hand, results indicate that the use of image post-processing software not concerned primarily with electron micrographs allows to obtain, in an easy way, fully-focused images of strongly uneven surface microareas of bloodstains from small series of partially out-of-focus digital SEM micrographs. On the other hand, results also indicate that such small series of electron micrographs can be utilized for generating 3D and 3D-like animations that can subsequently be converted into different formats, by using certain user-friendly software facilities not originally designed for use in SEM, that are easily available from Internet. Although the focus of this study was on bloodstains, the methods used in it well probably are also of relevance for studying the surface microstructures of other organic or inorganic materials whose sharp displaying is difficult of obtaining from a single SEM micrograph.

  4. Simulated Aging and Characterization of Phase Change Materials for Thermal Management of Building Envelopes

    DTIC Science & Technology

    2015-09-01

    materials of a PCM wall or ceiling panel. BioPCMat™ absorbs heat in the daytime and releases that heat during the night. The dimension of the typical...micrographs of Energain PCM samples showed evidence of melting and re- ERDC/CERL TR-15-23 32 crystallization ; however, there was no significant

  5. Harnessing health information in the Third World.

    PubMed

    Coghlan, S E; Khan, M S

    1993-01-01

    The provision of technical information on health in developing countries is discussed, with particular reference to the Diarrhoeal Diseases Information Services Centre in Bangladesh. Progress towards meeting the pressing needs of the Third World in this field can undoubtedly be made by increasing the use of micrographic, computer and videodisc technologies and by reorganizing and promoting the facilities on offer.

  6. Electron Micrographs of Quail Limb Bones formed in microgravity

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Electron micrographs of quail limb bones that formed under the influence of microgravity show decreased mineralization compared to bones formed in normal gravity. The letters B and C indicate bone and cartilage sides of the sample, respectively, with the arrows marking the junction between bone and cartilage cells. The asterisks indicate where mineralization begins. The bone that developed during spaceflight (top) shows less mineral compared to the control sample (bottom); the control sample clearly shows mineral deposits (dark spots) that are absent in the flight sample. Quail eggs are small and develop quickly, making them ideal for space experiments. In late 2001, the Avian Development Facility (ADF) made its first flight and carried eggs used in two investigations, development and function of the irner-ear balance system in normal and altered gravity environments, and skeletal development in embryonic quail.

  7. The effects of kinetic structure and micrograph content on achievement in reading micrographs by college biology students

    NASA Astrophysics Data System (ADS)

    Johnson, Virginia Abbott; Lockard, J. David

    The effects of kinetic structure and micrograph content on student achievement of reading micrograph skills were examined. The purpose of the study was to determine which form of kinetic structure, high or low, and/or micrograph content, unified or varied, was most effective and if there were any interactive effects. Randomly assigned to four treatment groups, 100 introductory college biology students attended three audiovisual presentations and practice sessions on reading light, transmission electron, and scanning electron micrographs. The micrograph skills test, administered at two points in time, assessed knowledge acquisition and retention. The test measured general concept skills and actual reading micrograph skills separately. All significant tests were considered with an = 0.05. High kinetic structure was found to be more effective than low kinetic structure in developing general concepts about micrographs. This finding supports Anderson's kinetic theory research. High kinetic structure instruction does not affect actual reading micrograph skills, but micrograph content does. Unified micrograph content practice sessions were more effective than varied micrograph content practice sessions. More attention should be given to the visual components of perceptual learning tasks.

  8. Using simulated fluorescence cell micrographs for the evaluation of cell image segmentation algorithms.

    PubMed

    Wiesmann, Veit; Bergler, Matthias; Palmisano, Ralf; Prinzen, Martin; Franz, Daniela; Wittenberg, Thomas

    2017-03-18

    Manual assessment and evaluation of fluorescent micrograph cell experiments is time-consuming and tedious. Automated segmentation pipelines can ensure efficient and reproducible evaluation and analysis with constant high quality for all images of an experiment. Such cell segmentation approaches are usually validated and rated in comparison to manually annotated micrographs. Nevertheless, manual annotations are prone to errors and display inter- and intra-observer variability which influence the validation results of automated cell segmentation pipelines. We present a new approach to simulate fluorescent cell micrographs that provides an objective ground truth for the validation of cell segmentation methods. The cell simulation was evaluated twofold: (1) An expert observer study shows that the proposed approach generates realistic fluorescent cell micrograph simulations. (2) An automated segmentation pipeline on the simulated fluorescent cell micrographs reproduces segmentation performances of that pipeline on real fluorescent cell micrographs. The proposed simulation approach produces realistic fluorescent cell micrographs with corresponding ground truth. The simulated data is suited to evaluate image segmentation pipelines more efficiently and reproducibly than it is possible on manually annotated real micrographs.

  9. Advanced human-machine interface for collaborative building control

    DOEpatents

    Zheng, Xianjun S.; Song, Zhen; Chen, Yanzi; Zhang, Shaopeng; Lu, Yan

    2015-08-11

    A system for collaborative energy management and control in a building, including an energy management controller, one or more occupant HMIs that supports two-way communication between building occupants and a facility manager, and between building occupants and the energy management controller, and a facility manager HMI that supports two-way communication between the facility manager and the building occupants, and between the facility manager and the energy management controller, in which the occupant HMI allows building occupants to provide temperature preferences to the facility manager and the energy management controller, and the facility manager HMI allows the facility manager to configure an energy policy for the building as a set of rules and to view occupants' aggregated temperature preferences, and the energy management controller determines an optimum temperature range that resolves conflicting occupant temperature preferences and occupant temperature preferences that conflict with the facility manager's energy policy for the building.

  10. Chinese wine classification system based on micrograph using combination of shape and structure features

    NASA Astrophysics Data System (ADS)

    Wan, Yi

    2011-06-01

    Chinese wines can be classification or graded by the micrographs. Micrographs of Chinese wines show floccules, stick and granule of variant shape and size. Different wines have variant microstructure and micrographs, we study the classification of Chinese wines based on the micrographs. Shape and structure of wines' particles in microstructure is the most important feature for recognition and classification of wines. So we introduce a feature extraction method which can describe the structure and region shape of micrograph efficiently. First, the micrographs are enhanced using total variation denoising, and segmented using a modified Otsu's method based on the Rayleigh Distribution. Then features are extracted using proposed method in the paper based on area, perimeter and traditional shape feature. Eight kinds total 26 features are selected. Finally, Chinese wine classification system based on micrograph using combination of shape and structure features and BP neural network have been presented. We compare the recognition results for different choices of features (traditional shape features or proposed features). The experimental results show that the better classification rate have been achieved using the combinational features proposed in this paper.

  11. Mechanical Testing of Ultra-High Temperature Ceramics at 1500 C in Air - Development of an Experimental Facility and Test Method

    DTIC Science & Technology

    2015-03-26

    SiC. TEM micrograph courtesy of R. S . Hay (AFRL/RXCC). ...................33 Fig. 5. Schematic of HfB2-based UHTC test specimen...the early work performed by the U. S . Air force and NASA was the identification of hafnium diboride (HfB2) and zirconium diboride (ZrB2) as good high...sintering, reactive routes, and spark plasma sintering. ~ 14 ~ Because diborides exhibit strong covalent bonding and low self-diffusion, high

  12. Atom Optics for Bose-Einstein Condensates (BEC)

    DTIC Science & Technology

    2012-04-25

    Electron Micrograph of the Top View of Test Chip A .......................................29 11. A Scanning Electron Micrograph of the Cross...Sectional View of Test Chip A .....................29 12. A Scanning Electron Micrograph of the Top View of Test Chip B...30 13. A Scanning Electron Micrograph of the Cross Sectional View of Test Chip B .....................30 14. Toner Masks for Etching

  13. A facile synthesis of metal nanoparticle - graphene composites for better absorption of solar radiation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharma, Bindu; Mulla, Rafiq; Rabinal, M. K., E-mail: mkrabinal@yahoo.com

    2015-06-24

    Herein, a facile chemical approach has been adopted to prepare silver nanoparticles (AgNPs)- graphene (G) composite to study photothermal effect. Sodium borohydride (SBH), a strong reducing agent has been selected for this work. Effect of SBH concentrations on optical behavior of AgNPs-G composite was also investigated. Resultant materials were characterized by various techniques including X-ray diffraction (XRD), fourier transform infrared spectroscopy (FTIR), optical absorption, scanning electron microscopy (SEM) and transmission electron microscopy (TEM). SEM micrographs confirm wrapping of AgNPs into graphene whereas XRD analysis reveals their particle size variation between 47 nm to 69 nm. Optical studies throw a light on theirmore » strong absorption behavior towards solar radiation.« less

  14. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400« less

  15. A Binary Segmentation Approach for Boxing Ribosome Particles in Cryo EM Micrographs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adiga, Umesh P.S.; Malladi, Ravi; Baxter, William

    Three-dimensional reconstruction of ribosome particles from electron micrographs requires selection of many single-particle images. Roughly 100,000 particles are required to achieve approximately 10 angstrom resolution. Manual selection of particles, by visual observation of the micrographs on a computer screen, is recognized as a bottleneck in automated single particle reconstruction. This paper describes an efficient approach for automated boxing of ribosome particles in micrographs. Use of a fast, anisotropic non-linear reaction-diffusion method to pre-process micrographs and rank-leveling to enhance the contrast between particles and the background, followed by binary and morphological segmentation constitute the core of this technique. Modifying the shapemore » of the particles to facilitate segmentation of individual particles within clusters and boxing the isolated particles is successfully attempted. Tests on a limited number of micrographs have shown that over 80 percent success is achieved in automatic particle picking.« less

  16. VIEW OF BUILDING 778 LOOKING WESTSOUTHWEST. BUILDING 778 HOUSED LAUNDRY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 778 LOOKING WEST-SOUTHWEST. BUILDING 778 HOUSED LAUNDRY FACILITIES, SHOWERS, LOCKER ROOMS, SANITARY FACILITIES, AN ELECTRIC SHOP, MACHINE SHOP, SHEET METAL SHOP, AND INERT GAS STORAGE. (12/7/90) - Rocky Flats Plant, Laundry Facility, Northeast quad of Plant between buildings 776/777 & 707, Golden, Jefferson County, CO

  17. 9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal area of building, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  18. Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee

    DTIC Science & Technology

    2006-02-01

    Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A Airside • ETF -A Exhauster • ETF -A Reefer • CE Facility • Rocket Storage • Von Karman Gas...Executive Order ESA Endangered Species Act ETF Engine Test Facility FamCamp Family Camping Area P:\\ARNOLDAFB\\333402DO42COMPLIANCE\\DEMOLITION...Fabrication Shop • Natural Resources Building • Salt Storage Building • Administration Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A

  19. 10. Building 105, Facilities Engineering Building, 1830, interior, air condition ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Building 105, Facilities Engineering Building, 1830, interior, air condition repair shop, S end of building, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  20. 8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, east side of building, center, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  1. Americans with Disabilities Act: Accessibility Guidelines for Buildings and Facilities, Transportation Facilities, Transportation Vehicles.

    ERIC Educational Resources Information Center

    Architectural and Transportation Barriers Compliance Board, Washington, DC.

    Guidelines are presented regarding accessibility to buildings and facilities, transportation facilities, and transportation vehicles by individuals with disabilities, under the Americans with Disabilities Act of 1990. These guidelines are to be applied during building design, construction, and alteration. Part 1 offers detailed facility…

  2. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  3. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  4. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  5. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  6. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  7. 13. Building 105, Facilities Engineering Building, 1830, interior, tin metal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Building 105, Facilities Engineering Building, 1830, interior, tin metal shop area, showing construction of window and part of ceiling, E wall of building. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  8. 45. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH BUILDING METAL SIDING BEING APPLIED ON "A" FACE (LEFT) AND "B" FACE (RIGHT). NOTE THAT NORTH IS GENERALLY TO RIGHT OF VIEW. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  9. 57. BUILDING NO. 1071, ORDNANCE FACILITY (CRYSTALLIZATION BUILDING), LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. BUILDING NO. 1071, ORDNANCE FACILITY (CRYSTALLIZATION BUILDING), LOOKING AT SOUTHEAST SIDE. NOTE ESCAPE CHUTES PROJECTING FROM SIDES OF BUILDING. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  10. 14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, crib area of building, showing electrical and plumbing cribs, wall and ceiling detail, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  11. 1. West facade of Plutonium Concentration Facility (Building 233S), ReductionOxidation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. West facade of Plutonium Concentration Facility (Building 233-S), Reduction-Oxidation Building (REDOX-202-S) to the right. Looking east. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  12. The Influence of Building Codes on Recreation Facility Design.

    ERIC Educational Resources Information Center

    Morrison, Thomas A.

    1989-01-01

    Implications of building codes upon design and construction of recreation facilities are investigated (national building codes, recreation facility standards, and misperceptions of design requirements). Recreation professionals can influence architectural designers to correct past deficiencies, but they must understand architectural and…

  13. 2. Credit PSR. The Administration/Shops Building appears here as the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Credit PSR. The Administration/Shops Building appears here as the camera looks east (84°). To the right in the view is the Guard House (Building 4279/E-80) which controls entry to the JPL facility. At left is a warehouse (Building 4287/E88). Overhead utility lines supply alternating current to the facility. - Jet Propulsion Laboratory Edwards Facility, Administration & Shops Building, Edwards Air Force Base, Boron, Kern County, CA

  14. 63. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), INTERIOR, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), INTERIOR, LOOKING SOUTHEAST DOWN SCREENED WALKWAY ON NORTHWEST SIDE. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  15. Credit BG. Northeast and northwest facades of Building 4496 (Security ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit BG. Northeast and northwest facades of Building 4496 (Security Facility) as seen when looking south (178°) from entrance to secured area. The Control Tower (Building 4500) appears in background. The Security Facility is part of the secured Building 4505 complex - Edwards Air Force Base, North Base, Security Facility, Northeast of A Street, Boron, Kern County, CA

  16. 42. CAPE COD AIR STATION PAVE PAWS FACILITY SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. CAPE COD AIR STATION PAVE PAWS FACILITY - SHOWING BUILDING "RED IRON" STEEL STRUCTURE AT 46T DAY OF STEEL CONSTRUCTION. "BUILDING TOPPED OFF, 7 JULY, 1974. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  17. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  18. MINIMUM AREAS FOR ELEMENTARY SCHOOL BUILDING FACILITIES.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Public Instruction, Harrisburg.

    MINIMUM AREA SPACE REQUIREMENTS IN SQUARE FOOTAGE FOR ELEMENTARY SCHOOL BUILDING FACILITIES ARE PRESENTED, INCLUDING FACILITIES FOR INSTRUCTIONAL USE, GENERAL USE, AND SERVICE USE. LIBRARY, CAFETERIA, KITCHEN, STORAGE, AND MULTIPURPOSE ROOMS SHOULD BE SIZED FOR THE PROJECTED ENROLLMENT OF THE BUILDING IN ACCORDANCE WITH THE PROJECTION UNDER THE…

  19. Building Information Modeling (BIM) Primer. Report 1: Facility Life-Cycle Process and Technology Innovation

    DTIC Science & Technology

    2012-08-01

    Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology Innovation In fo...is unlimited. ERDC/ITL TR-12-2 August 2012 Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology...and to enhance the quality of projects through the design, construction, and handover phases. Building Information Modeling ( BIM ) is a

  20. 1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING 771 WAS ONE OF THE FIRST FOUR MAJOR BUILDINGS AT THE ROCKY FLATS PLANT, BUILDING 771 WAS ORIGINALLY THE PRIMARY FACILITY FOR PLUTONIUM OPERATIONS. (5/29/52) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  1. 75 FR 67711 - Extension of Scoping Period for the Supplemental Environmental Impact Statement for the Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... facility portion of the Chemistry and Metallurgy Research Building Replacement Project (CMRR-NF) at Los...

  2. 9. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT "C" FACE RADAR SYSTEM EMITTER/ANTENNA. VIEW IS LOOKING SOUTH 30° EAST (NOTE: "C" FACE NOT IN USE AT FACILITY). - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. Research Support Facility (RSF): Leadership in Building Performance (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This brochure/poster provides information on the features of the Research Support Facility including a detailed illustration of the facility with call outs of energy efficiency and renewable energy technologies. Imagine an office building so energy efficient that its occupants consume only the amount of energy generated by renewable power on the building site. The building, the Research Support Facility (RSF) occupied by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) employees, uses 50% less energy than if it were built to current commercial code and achieves the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED{reg_sign})more » Platinum rating. With 19% of the primary energy in the U.S. consumed by commercial buildings, the RSF is changing the way commercial office buildings are designed and built.« less

  4. Design-Build Process for the Research Support Facility (RSF) (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-06-01

    An in-depth look at how the U.S. DOE and NREL used a performance-based design-build contract to build the Research Support Facility (RSF); one of the most energy efficient office buildings in the world.

  5. 62. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), LOOKING AT NORTHWEST FACADE. ACCESS TO ROOF ALLOWS MAINTENANCE OF VENTILATION EQUIPMENT WHICH IS PLACED OUTSIDE BUILDING TO MINIMIZE EXPLOSION HAZARD. NO. 2 VISIBLE ON WALL OF BUILDING STANDS FOR EXPLOSION HAZARD WITH FRAGMENTATION. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  6. Hazardous Waste Cleanup: Republic Environmental Systems in Farmingdale, New York

    EPA Pesticide Factsheets

    The Republic Environmental Systems facility was located in an area of industrial and commercial properties. The facility was surrounded by a perimeter fence and consisted of two main buildings (Building 1 and Building 2) and a small maintenance building

  7. 32 CFR 644.486 - Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar contracts. 644.486 Section 644.486 National... Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar...

  8. Applications for Micrographics in Large Scale Information Systems of the Future. Volume II: Part III. A Review of Micrographics State-of-the-Art.

    ERIC Educational Resources Information Center

    Information Dynamics Corp., Reading, MA.

    A five-year development program plan was drawn up for the Defense Documentation Center (DDC). This report presents in summary form the results of various surveys and reviews performed in selected areas of micrographics to support the efforts of the program's planners. Exhibits of supporting documentation are presented, together with a discussion…

  9. 38 CFR 39.21 - Space criteria for support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... building. The administrative building should be approximately 1,600 NSF in total, providing space, as... room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance/service building may be combined with the...

  10. 46. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH ALL METAL SIDING INSTALLED AND WITH EMITTER/ANTENNA ARRAY SYSTEM NEARING OCMPLETION ON "B" FACE (RIGHT). VIEW ALSO SHOWS TRAVELING "CLEANING" SYSTEM ON "B" FACE - NOW REMOVED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  11. Current Concerns for Austrian School Facilities.

    ERIC Educational Resources Information Center

    Schwarz-Viechtbauer, Karin

    2003-01-01

    Summarizes four recent concerns of the Austrian Institute for School and Sport Facilities, which is responsible for current issues and problems related to educational buildings in the country: schools as low energy buildings, electromagnetic fields and school buildings, chairs and tables for educational buildings, and school grounds (learnscapes).…

  12. FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP603) SHOWING STORAGE BASINS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS, FUEL ELEMENT CUTTING FACILITY, AND DRY GRAPHITE STORAGE FACILITY. INL DRAWING NUMBER 200-0603-00-030-056329. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  13. 55. Room BF9, paper shredding facility, basement level, building 500, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Room BF-9, paper shredding facility, basement level, building 500, looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE

  14. 9. Historic construction view of Building 100. 1956. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Historic construction view of Building 100. 1956. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE AND SUBCONTRACTOR PHYSICAL EXAMINATIONS. (10/85) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  16. This photographic copy of an engineering drawing shows floor plans, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA

  17. NREL Buildings Research Video

    ScienceCinema

    None

    2017-12-09

    Through research, the National Renewable Energy Laboratory (NREL) has developed many strategies and design techniques to ensure both commercial and residential buildings use as little energy as possible and also work well with the surroundings. Here you will find a video that introduces the work of NREL Buildings Research, highlights some of the facilities on the NREL campus, and demonstrates these efficient building strategies. Watch this video to see design highlights of the Science and Technology Facility on the NREL campus—the first Federal building to be LEED® Platinum certified. Additionally, the video demonstrates the energy-saving features of NRELs Thermal Test Facility.

  18. Environmental assessment for the proposed construction and operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This document is an Environmental Assessment (EA) for a proposed project to modify 14,900 square feet of an existing building (Building 64) at Lawrence Berkeley Laboratory (LBL) to operate as a Genome Sequencing Facility. This EA addresses the potential environmental impacts from the proposed modifications to Building 64 and operation of the Genome Sequencing Facility. The proposed action is to modify Building 64 to provide space and equipment allowing LBL to demonstrate that the Directed DNA Sequencing Strategy can be scaled up from the current level of 750,000 base pairs per year to a facility that produces over 6,000,000 basemore » pairs per year, while still retaining its efficiency.« less

  19. VIEW OF BUILDING 122 WHICH HOUSES THE ONSITE MEDICAL FACILITIES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 122 WHICH HOUSES THE ON-SITE MEDICAL FACILITIES OF THE ROCKY FLATS PLANT AND THE OCCUPATIONAL HEALTH AND INTERNAL DOSIMETRY ORGANIZATIONS. EMERGENCY MEDICAL SERVICES, DIAGNOSIS, DECONTAMINATION, FIRST AID, X-RAY, MINOR SURGICAL TREATMENT, AND AMBULATORY ACTIVITIES ARE CARRIED OUT IN THIS BUILDING. (1/98) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  20. Quantitative evaluation of high-resolution features in images of negatively stained Tobacco Mosaic Virus.

    PubMed

    Chang, C F; Williams, R C; Grano, D A; Downing, K H; Glaeser, R M

    1983-01-01

    This study investigates the causes of the apparent differences between the optical diffraction pattern of a micrograph of a Tobacco Mosaic Virus (TMV) particle, the optical diffraction pattern of a ten-fold photographically averaged image, and the computed diffraction pattern of the original micrograph. Peak intensities along the layer lines in the transform of the averaged image appear to be quite unlike those in the diffraction pattern of the original micrograph, and the diffraction intensities for the averaged image extend to unexpectedly high resolution. A carefully controlled, quantitative comparison reveals, however, that the optical diffraction pattern of the original micrograph and that of the ten-fold averaged image are essentially equivalent. Using computer-based image processing, we discovered that the peak intensities on the 6th layer line have values very similar in magnitude to the neighboring noise, in contrast to what was expected from the optical diffraction pattern of the original micrograph. This discrepancy was resolved by recording a series of optical diffraction patterns when the original micrograph was immersed in oil. These patterns revealed the presence of a substantial phase grating effect, which exaggerated the peak intensities on the 6th layer line, causing an erroneous impression that the high resolution features possessed a good signal-to-noise ratio. This study thus reveals some pitfalls and misleading results that can be encountered when using optical diffraction patterns to evaluate image quality.

  1. 41 CFR 102-74.335 - Who is responsible for furnishing and installing signs concerning smoking restrictions in the...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...

  2. 41 CFR 102-74.335 - Who is responsible for furnishing and installing signs concerning smoking restrictions in the...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...

  3. 41 CFR 102-74.335 - Who is responsible for furnishing and installing signs concerning smoking restrictions in the...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...

  4. 41 CFR 102-74.335 - Who is responsible for furnishing and installing signs concerning smoking restrictions in the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...

  5. 41 CFR 102-74.335 - Who is responsible for furnishing and installing signs concerning smoking restrictions in the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...

  6. Building Air Quality: A Guide for Building Owners and Facility Managers.

    ERIC Educational Resources Information Center

    Agle, Elizabeth; Galbraith, Susan

    The past two decades have witnessed increased concerns over the health and comfort of indoor air quality (IAQ), but little indoor air-related information has been targeted at building owners and facility managers of public and commercial buildings. This manual, specifically created for such a population, provides guidance on preventing,…

  7. KSC-2010-1114

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - The 525-foot-tall Vehicle Assembly Building, in the background, is witness to the formation of the Propellants North Administrative and Maintenance Facility, a new "green" building under construction in Launch Complex 39 at NASA's Kennedy Space Center in Florida. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  8. Facility Focus: Academic and Administrative Buildings.

    ERIC Educational Resources Information Center

    College Planning & Management, 1999

    1999-01-01

    Describes how academic and administrative buildings can be designed to support learning into the next century in the following examples: an applied science an engineering facility; a college greenhouse; and a public affairs classroom building. Photos and floor plans accompany each example. (GR)

  9. Panorama, section 2 of 3, note the Operations Building (Facility ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Panorama, section 2 of 3, note the Operations Building (Facility 294) in the center of facility, view facing west - U.S. Naval Base, Pearl Harbor, Naval Radio Station, AF/FRD-10 Circularly Disposed Antenna Array, Wahiawa, Honolulu County, HI

  10. The Benefits of Incorporating Shipping Containers into the Climate Change Adaption Plans at NASA Wallops Flight Facility

    NASA Technical Reports Server (NTRS)

    Hamilton, Carl Kenneth Gonzaga

    2017-01-01

    The National Aeronautics and Space Administration has several centers and facilities located near the coast that are undoubtedly susceptible to climate change. One of those facilities is Wallops Flight Facility on the Eastern Shore of Virginia which is separated into three areas: Main Base, Mainland, and the Island. Wallops Island has numerous buildings and assets that are vulnerable to flood inundation, intense storms, and storm surge. The shoreline of Wallops Island is prone to beach erosion and is slated for another beach replenishment project in 2019. In addition, current climate projections for NASAs centers and facilities, conducted by the Climate Adaptation Science Investigators, warn of inevitable increases in annual temperature, precipitation, sea level rise, and extreme events such as heat waves. The aforementioned vulnerabilities Wallops Island faces in addition to the projections of future climate change reveal an urgency for NASA to adjust how new buildings at its centers and facilities near the coast are built to adapt to the inevitable effects of climate change. Although the agency has made strides to mitigate the effects of climate change by incorporating L.E.E.D. into new buildings that produce less greenhouse gas, the strides for the agency to institute clear climate adaptation policies for the buildings at its centers and facilities near the coast seem to lag behind. As NASA continues to formulate formidable climate change adaptation plans for its centers and facilities, an architectural trend that should be examined for its potential to replace several old buildings at Wallops Island is shipping containers buildings. Shipping containers or Intermodal Steel Building Units offer an array of benefits such as strength, durability, versatility, modular, and since they can be upcycled, they are also eco-friendly. Some disadvantages of shipping containers are they contain harmful chemicals, insulation must be added, fossil fuels must be used to transport them to the site, and multiple ISBUs are needed. However, the benefits of shipping container buildings could be utilized at NASA centers or facilities near the coast such as Wallops Island on new buildings that are designed to adapt to the impending effects of climate change. Thus, this Masters Research Project will explore how those benefits can be incorporated into the climate change adaptation plans at Wallops Island and make recommendations for policy guidelines and shipping container buildings specific to Wallops Island.

  11. Study of Mechano-Chemical Machining of Ceramics and the Effect on Thin Film Behavior.

    DTIC Science & Technology

    1981-06-01

    polished 7 dry on nylon using NaCI 3 Photomicrographs of the etched surfaces of MgO polished 8 .wet on glass using NaCl 4 Surface profile and Nomarski ...micrograph of a Si wafer 10 taken before mechano-chemical polishing 5 Surface profile and Nomarski micrograph of a Si wafer 11 taken after mechano... Nomarski micrographs of mechano-chemically-polished 21 sapphire and tape-cast alumina 14 Surface profiles of mechano-chemically-polished sapphire 22

  12. C-431 B -- Scope document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollister, H.L.

    1951-06-01

    This document describes the scope of the C-431-B Reactor Production Facility. In dealing with the broad phases of the project, it includes the Sections ``A`` (Scope Modifications) of the approved Design Criteria, modified to ensure correctness to date. Location of the facility has been set as shown on the site map in HDC-2101, designated site number one. Included in Project C-431-B are the 105-C Building, including within that building facilities previously located in the 1608 Building, a contaminated effluent crib adjacent to 105-C, and gas facilities using the 115-B Building interconnected with 105-C. Also included are an oil shed, amore » thimble storage cave, a badge house, and an exclusion fence. Building services and process lines will be considered part of the project to a location nominally five feet outside of 105-C.« less

  13. 2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING 444 WAS THE PRIMARY NON-PLUTONIUM MANUFACTURING FACILITY AT THE ROCKY FLATS PLANT. MANUFACTURING PROCESSES COMPLETED IN THIS BUILDING WERE USED TO FABRICATE WEAPONS COMPONENTS AND ASSEMBLIES FOR A VARIETY OF MATERIALS, INCLUDING DEPLETED URANIUM, BERYLLIUM, STAINLESS STEEL, ALUMINUM, AND VANADIUM. (4/25/52) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  14. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south facade. Camera facing north. High-bay section is pool room. Single-story section at right is control building (TAN-645). Small metal building is post-1970 addition. INEEL negative no. HD-40-7-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. 21 CFR 225.20 - Buildings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.20 Buildings. (a) The location, design, construction, and physical size of the buildings and other production facilities are factors important to the manufacture of medicated feed. The features of...

  16. BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. BUILDING 67 IS SURMISED TO HAVE BEEN A RAILROAD STATION DAYS WHEN SITE WAS A RESORT - National Home for Disabled Volunteer Soldiers, Eastern Branch, 1 VA Center, Augusta, Kennebec County, ME

  17. A Facilities Manager's Guide to Green Building Design.

    ERIC Educational Resources Information Center

    Simpson, Walter

    2001-01-01

    Explains how the "green building" approach to educational facilities design creates healthy, naturally lit, attractive buildings with lower operating and life cycle costs. Tips on getting started on a green design and overcoming the barriers to the green design concept are discussed. (GR)

  18. 38 CFR 39.62 - Space criteria for support facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assignment for the next 10 years. (a) Administrative building. The administrative building should be.../office/equipment/work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The...

  19. 38 CFR 39.62 - Space criteria for support facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 10 years. (a) Administrative building. The administrative building should be approximately 1,600 NSF.../work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance...

  20. This photograph, looking southwest in Room 107, demonstrates some of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photograph, looking southwest in Room 107, demonstrates some of the laboratory equipment and facilities which have been recently used in E Building - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  1. 43. CAPE COD AIR STATION PAVE PAWS FACILITY WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. CAPE COD AIR STATION PAVE PAWS FACILITY - WITH BUILDING METAL SIDING BEING APPLIED ON "C" FACE (RIGHT) AND "B" FACE BEING PREPARED FOR INSTALLATION. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. 28 CFR 36.606 - Effect of certification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PUBLIC ACCOMMODATIONS AND IN COMMERCIAL FACILITIES Certification of State Laws or Local Building Codes... the question of whether equipment in a building built according to the code satisfies the Act's... buildings and facilities that comply with the certified code. A submitting official may reapply for...

  3. 28 CFR 36.606 - Effect of certification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PUBLIC ACCOMMODATIONS AND IN COMMERCIAL FACILITIES Certification of State Laws or Local Building Codes... the question of whether equipment in a building built according to the code satisfies the Act's... buildings and facilities that comply with the certified code. A submitting official may reapply for...

  4. 28 CFR 36.606 - Effect of certification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PUBLIC ACCOMMODATIONS AND IN COMMERCIAL FACILITIES Certification of State Laws or Local Building Codes... the question of whether equipment in a building built according to the code satisfies the Act's... buildings and facilities that comply with the certified code. A submitting official may reapply for...

  5. 28 CFR 36.606 - Effect of certification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PUBLIC ACCOMMODATIONS AND IN COMMERCIAL FACILITIES Certification of State Laws or Local Building Codes... the question of whether equipment in a building built according to the code satisfies the Act's... buildings and facilities that comply with the certified code. A submitting official may reapply for...

  6. 10 CFR 580.02 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... paragraph (b)(2) of this section. (4) Hospital means a facility whose primary function is delivering medical... apartment buildings and other multi-unit residential buildings. (9) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  7. 10 CFR 580.02 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... paragraph (b)(2) of this section. (4) Hospital means a facility whose primary function is delivering medical... apartment buildings and other multi-unit residential buildings. (9) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  8. 10 CFR 580.02 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... paragraph (b)(2) of this section. (4) Hospital means a facility whose primary function is delivering medical... apartment buildings and other multi-unit residential buildings. (9) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  9. 10 CFR 580.02 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... paragraph (b)(2) of this section. (4) Hospital means a facility whose primary function is delivering medical... apartment buildings and other multi-unit residential buildings. (9) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility...

  10. 7. WASTE CALCINING FACILITY, LOOKING AT NORTH END OF BUILDING. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. WASTE CALCINING FACILITY, LOOKING AT NORTH END OF BUILDING. CAMERA FACING SOUTH. TENT-ROOFED COVER IN RIGHT OF VIEW IS A TEMPORARY WEATHER-PROOFING SHELTER OVER THE BLOWER PIT IN CONNECTION WITH DEMOLITION PROCEDURES. SMALL BUILDING CPP-667 IN CENTER OF VIEW WAS USED FOR SUPPLEMENTARY OFFICE SPACE BY HEALTH PHYSICISTS AND OTHERS. INEEL PROOF SHEET NOT NUMBERED. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  11. [Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building].

    PubMed

    Lee, Geauchul

    2016-04-01

    This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern 'model' like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.

  12. United Space Alliance LLC Parachute Refurbishment Facility Model

    NASA Technical Reports Server (NTRS)

    Esser, Valerie; Pessaro, Martha; Young, Angela

    2007-01-01

    The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.

  13. Optical characterization of fritted glass for architectural applications

    NASA Astrophysics Data System (ADS)

    Jonsson, Jacob C.; Rubin, Michael D.; Nilsson, Annica M.; Jonsson, Andreas; Roos, Arne

    2009-04-01

    Fritted glass is commonly used as a light diffusing element in modern buildings. Traditionally it has been used for aesthetic purposes but it can also be used for energy savings by incorporating it in novel daylighting systems? To answer such questions the light scattering properties must be properly characterized. This paper contains measurements of different varieties of fritted glass, ranging from the simplest direct-hemispherical measurements to angle-resolved goniometer measurements. Modeling the light scattering to obtain the full bidirectional scattering distribution function (BSDF) extends the measured data, making it useful in simulation programs such as Window 6 and Radiance. Surface profilometry results and SEM micrographs are included to demonstrate the surface properties of the samples studied.

  14. Building Condition and Suitability Evaluation Manual.

    ERIC Educational Resources Information Center

    MGT of America, Inc., Tallahassee, FL.

    This educational facility evaluation manual contains the overall building condition rating form and the supporting check sheets which have been field tested in several states and, where appropriate, modified for use in the Idaho School Facilities Needs Assessment. The exterior building condition form examines the foundation, structure, walls,…

  15. 14. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic view of engineer in Building 100 control room examining data printout. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46210. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  16. 13. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic view of Building 100 control room, showing personnel with data recording instrumentation. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46211. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. 12. SOUTHWEST VIEW OF BUILDING 25C (SUBSONIC AERODYNAMICS TEST FACILITY) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. SOUTHWEST VIEW OF BUILDING 25C (SUBSONIC AERODYNAMICS TEST FACILITY) (1992). - Wright-Patterson Air Force Base, Area B, Buildings 25 & 24,10-foot & 20-foot Wind Tunnel Complex, Northeast side of block bounded by K, G, Third, & Fifth Streets, Dayton, Montgomery County, OH

  18. Earthquakes and building design: a primer for the laboratory animal professional.

    PubMed

    Vogelweid, Catherine M; Hill, James B; Shea, Robert A; Johnson, Daniel B

    2005-01-01

    Earthquakes can occur in most regions of the United States, so it might be necessary to reinforce vulnerable animal facilities to better protect research animals during these unpredictable events. A risk analysis should include an evaluation of the seismic hazard risk at the proposed building site balanced against the estimated consequences of losses. Risk analysis can help in better justifying and recommending to building owners the costs of incorporating additional seismic reinforcements. The planning team needs to specify the level of post-earthquake building function that is desired in the facility, and then design the facility to it.

  19. Haselden/RNL - Research Support Facility Documentary

    ScienceCinema

    Haselden, Byron; Baker, Jeff; Glover, Bill; von Luhrte, Rich; Randock, Craig; Andary, John; Macey, Philip; Okada, David

    2017-12-12

    The US Department of Energy's (DOE) Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory is positioned to be one of the most energy efficient buildings in the world. It will demonstrate NREL's role in moving advanced technologies and transferring knowledge into commercial applications. Because 19 percent of the country's energy is used by commercial buildings, DOE plans to make this facility a showcase for energy efficiency. DOE hopes the design of the RSF will be replicated by the building industry and help reduce the nation's energy consumption by changing the way commercial buildings are designed and built.

  20. Science Facilities Bibliography.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A bibliographic collection on science buildings and facilities is cited with many different reference sources for those concerned with the design, planning, and layout of science facilities. References are given covering a broad scope of information on--(1) physical plant planning, (2) management and safety, (3) building type studies, (4) design…

  1. DOE passive solar commercial buildings program: project summaries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The 23 projects participating in this program comprise a wide range of building types including offices, retail establishments, educational facilities, public service facilities, community and visitor centers, and private specialized-use facilities, located throughout the United States. Summary data and drawings are presented for each project. (MHR)

  2. 6. Historic photo of rocket engine test facility Building 202 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Historic photo of rocket engine test facility Building 202 complex in operation at night, September 12, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45924. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  3. MORPH-II, a software package for the analysis of scanning-electron-micrograph images for the assessment of the fractal dimension of exposed stone surfaces

    USGS Publications Warehouse

    Mossotti, Victor G.; Eldeeb, A. Raouf

    2000-01-01

    Turcotte, 1997, and Barton and La Pointe, 1995, have identified many potential uses for the fractal dimension in physicochemical models of surface properties. The image-analysis program described in this report is an extension of the program set MORPH-I (Mossotti and others, 1998), which provided the fractal analysis of electron-microscope images of pore profiles (Mossotti and Eldeeb, 1992). MORPH-II, an integration of the modified kernel of the program MORPH-I with image calibration and editing facilities, was designed to measure the fractal dimension of the exposed surfaces of stone specimens as imaged in cross section in an electron microscope.

  4. 3. Credit PSR. This view looks south southwest (206°) at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Credit PSR. This view looks south southwest (206°) at the north and east elevations. The large wing dominating this view contains a machine shop and other facilities used to build or maintain test equipment. A small gasoline facility for automobiles was formerly located near the east end of the building; it was removed in 1995. - Jet Propulsion Laboratory Edwards Facility, Administration & Shops Building, Edwards Air Force Base, Boron, Kern County, CA

  5. Energy Conscious Design: Educational Facilities. [Brief No.] 1.

    ERIC Educational Resources Information Center

    American Inst. of Architects, Washington, DC.

    An energy task group of the American Institute of Architects discusses design features and options that educational facility designers can use to create an energy efficient school building. Design elements cover the building envelope, energy storage system, hydronic heating/cooling systems, solar energy collection, building orientation and shape,…

  6. 75 FR 34441 - Office of Safe and Drug-Free Schools; Overview Information; Educational Facilities Clearinghouse...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... priority. This priority is: Development and Dissemination of Information on Green Building Practices. Under... practices in constructing and maintaining environmentally sound educational facilities using green building practices. For the purposes of this competition the term ``green building,'' as defined by the U.S...

  7. 15. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic view of engineer in Building 100 control room examining data printout. August 28, 1962. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-61500. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. Building Management Policy and Procedures for Emergency Preparedness and Facility Coordination for the Ernest Orlando Lawrence Berkeley National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EHS Staff

    2003-04-01

    To ensure efficient and effective management of LBNL facilities, LBNL shall assign line managers to perform appropriate work functions. LBNL divisions that are delegated responsibility for the management of buildings shall designate division personnel to serve as --''Building Managers.''

  9. 75 FR 54961 - Final Supplemental Environmental Impact Statement, Single Nuclear Unit at the Bellefonte Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... facility, a wind farm, a methane- gas cofiring facility, and several small solar photovoltaic facilities... maintenance of select plant systems and other regulatory compliance activities. Major buildings and plant... the plant cooling towers and the reactor, auxiliary, control, turbine, office, and service buildings...

  10. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...

  11. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...

  12. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...

  13. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... buildings and other facilities. (7) An appropriate share of the cost of the equipment and facilities used in construction work. (8) Fixed equipment and related installation costs required for activities in a building or... construction work. (10) Legal and recording fees and damage claims. (11) Fair values of facilities and...

  14. Rates of inactivation of waterborne coliphages by monochloramine.

    PubMed Central

    Dee, S W; Fogleman, J C

    1992-01-01

    A sophisticated water quality monitoring program was established to evaluate virus removal through Denver's 1-million-gal (ca. 4-million-liter)/day Direct Potable Reuse Demonstration Plant. As a comparison point for the reuse demonstration plant, Denver's main water treatment facility was also monitored for coliphage organisms. Through the routine monitoring of the main plant, it was discovered that coliphage organisms were escaping the water treatment processes. Monochloramine residuals and contact times (CT values) required to achieve 99% inactivation were determined for coliphage organisms entering and leaving this conventional water treatment plant. The coliphage tested in the effluent waters had higher CT values on the average than those of the influent waters. CT values established for some of these coliphages suggest that monochloramine alone is not capable of removing 2 orders of magnitude of these specific organisms in a typical water treatment facility. Electron micrographs revealed one distinct type of phage capable of escaping the water treatment processes and three distinct types of phages in all. Images PMID:1444427

  15. Fuzzy Reasoning to More Accurately Determine Void Areas on Optical Micrographs of Composite Structures

    NASA Technical Reports Server (NTRS)

    Dominquez, Jesus A.; Tate, Lanetra C.; Wright, M. Clara; Caraccio, Anne

    2013-01-01

    Accomplishing the best-performing composite matrix (resin) requires that not only the processing method but also the cure cycle generate low-void-content structures. If voids are present, the performance of the composite matrix will be significantly reduced. This is usually noticed by significant reductions in matrix-dominated properties, such as compression and shear strength. Voids in composite materials are areas that are absent of the composite components: matrix and fibers. The characteristics of the voids and their accurate estimation are critical to determine for high performance composite structures. One widely used method of performing void analysis on a composite structure sample is acquiring optical micrographs or Scanning Electron Microscope (SEM) images of lateral sides of the sample and retrieving the void areas within the micrographs/images using an image analysis technique. Segmentation for the retrieval and subsequent computation of void areas within the micrographs/images is challenging as the gray-scaled values of the void areas are close to the gray-scaled values of the matrix leading to the need of manually performing the segmentation based on the histogram of the micrographs/images to retrieve the void areas. The use of an algorithm developed by NASA and based on Fuzzy Reasoning (FR) proved to overcome the difficulty of suitably differentiate void and matrix image areas with similar gray-scaled values leading not only to a more accurate estimation of void areas on composite matrix micrographs but also to a faster void analysis process as the algorithm is fully autonomous.

  16. KSC-2014-4140

    NASA Image and Video Library

    2014-09-25

    CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 pass the Vehicle Assembly Building in Launch Complex 39 at NASA’s Kennedy Space Center in Florida on their way to NASA's Locomotive Maintenance Facility. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper

  17. Mohs micrographic surgery vs traditional surgical excision: a cost comparison analysis.

    PubMed

    Bialy, Tracy L; Whalen, James; Veledar, Emir; Lafreniere, Denis; Spiro, Jeffrey; Chartier, Timothy; Chen, Suephy C

    2004-06-01

    To compare the cost and margin adequacy of Mohs micrographic surgery (Mohs) and traditional surgical excision (TSE) for the treatment of facial and auricular nonmelanoma skin cancer (NMSC). Prospective cost analysis with each patient serving as his or her own control. Study was performed from 1999 to 2001 at the University of Connecticut dermatology clinic, a tertiary care referral center. A total of 98 consecutive patients with a primary diagnosis of NMSC on the face and ears. The average cost of Mohs and TSE per patient for the treatment and repair of NMSC; adequacy of TSE margins after the initial procedure(because this outcome affects overall cost). Mohs was cost comparable to TSE when the subsequent procedure for inadequate TSE margins after permanent section was Mohs (937 vs 1029 US dollars; P =.16) or a subsequent TSE (937 vs 944 US dollars; P =.53). When facility-based frozen sections were requested for TSE, Mohs was significantly less costly (956 vs 1399 US dollars; P<.001). The cost difference between Mohs and TSE was sensitive to the type of repair chosen. If the end point is clear margins, Mohs is cost comparable to TSE performed by otolaryngologic surgeons. Some caution is needed when evaluating the cost of facial and auricular NMSC treatment because the choice of repair can significantly affect the cost conclusions.

  18. 28 CFR 36.402 - Alterations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... affect the usability of the building or facility or any part thereof. (1) Alterations include, but are... the usability of the building or facility. (2) If existing elements, spaces, or common areas are...

  19. 28 CFR 36.402 - Alterations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affect the usability of the building or facility or any part thereof. (1) Alterations include, but are... the usability of the building or facility. (2) If existing elements, spaces, or common areas are...

  20. 28 CFR 36.402 - Alterations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affect the usability of the building or facility or any part thereof. (1) Alterations include, but are... the usability of the building or facility. (2) If existing elements, spaces, or common areas are...

  1. 28 CFR 36.402 - Alterations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... affect the usability of the building or facility or any part thereof. (1) Alterations include, but are... the usability of the building or facility. (2) If existing elements, spaces, or common areas are...

  2. 28 CFR 36.402 - Alterations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... affect the usability of the building or facility or any part thereof. (1) Alterations include, but are... the usability of the building or facility. (2) If existing elements, spaces, or common areas are...

  3. Haselden/RNL - Research Support Facility Documentary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haselden, Byron; Baker, Jeff; Glover, Bill

    2010-06-10

    The US Department of Energy's (DOE) Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory is positioned to be one of the most energy efficient buildings in the world. It will demonstrate NREL's role in moving advanced technologies and transferring knowledge into commercial applications. Because 19 percent of the country's energy is used by commercial buildings, DOE plans to make this facility a showcase for energy efficiency. DOE hopes the design of the RSF will be replicated by the building industry and help reduce the nation's energy consumption by changing the way commercial buildings are designedmore » and built.« less

  4. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  5. Saturn Apollo Program

    NASA Image and Video Library

    1968-10-01

    The Saturn IB and Saturn V flight vehicles first stages were manufactured at the Michoud Assembly Facility located 24 kilometers (approximately 15 miles) east of downtown New Orleans, Louisiana. The basic manufacturing building boasted 43 acres under one roof. By 1964, NASA added a separate engineering and office building, vertical assembly building, and test stage building. By 1966, other changes to the site included enlarged barge facilities and other miscellaneous support buildings. The image is a view of various vehicle components in the manufacturing plant.

  6. 40. Photocopy of building model photograph, ca., 1974, photographer unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of building model photograph, ca., 1974, photographer unknown. Original photograph property of United States Air Force, 21" Space Command. CAPE COD AIR STATION PAVE PAWS FACILITY MODEL - ELEVATION SHOWING FLOOR AND EQUIPMENT LAYOUT. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  7. 39. Photocopy of building model photograph, ca. 1974, photographer unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photocopy of building model photograph, ca. 1974, photographer unknown. Original photograph property of United States Air Force, 21" Space Command. CAPE COD AIR STATION PAVE PAWS FACILITY MODEL - SHOWING "A" AND "B" FACES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. Building Pressure: Modeling the Fiscal Future of California K-12 School Facilities

    ERIC Educational Resources Information Center

    Jain, Liz S.; Vincent, Jefrey M.

    2016-01-01

    Public school districts across California, particularly those in low-wealth areas, experience significant funding shortfalls for their facilities. Industry benchmarks suggest the state's K-12 school districts should spend nearly $18 billion a year to maintain their inventory, ensure buildings are up-to-date, and to build new spaces to handle…

  9. 12. Historic view of Building 100 control room, showing television ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic view of Building 100 control room, showing television monitoring of tests and personnel operating rocket engine test controls. May 27, 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-45021. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  10. 56. Historic photo of excavation work at Building 202, shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. Historic photo of excavation work at Building 202, shows facility with exhaust scrubber in foreground, February 24, 1969. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-69-712. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  11. 55. Historic photo of excavation work at Building 202, shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Historic photo of excavation work at Building 202, shows facility with detention tank in foreground, February 24, 1969. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-69-711. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  12. Cultural Landscape Inventory for Picatinny Arsenal, New Jersey

    DTIC Science & Technology

    2016-08-01

    district, site, building, structure, or object. Identification of potentially significant properties is achieved only through a survey and evaluation to...68 3.9.6 Experimental Test Facility (Building 606) ................................................................ 71 3.9.7...Construction Engineering Research Laboratory FRP Facility Reduction Plan HABS Historic American Buildings Survey NAD Naval Ammunition Depot NARA National

  13. 77 FR 56817 - Notice of Public Hearings for the Draft Environmental Impact Statement for Medical Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... buildings (Buildings 2, 4, 6, 7, and 8) and construction of a single 5-story replacement facility in the... clinics; incorporate evidence-based design; include expansion of technology; and allow for operational... regulation. 2. MFD--demolition of five hospital buildings, construction of a single 5-story replacement...

  14. A laboratory facility for research on wind-driven rain intrusion in building envelope assemblies

    Treesearch

    Samuel V. Glass

    2010-01-01

    Moisture management is critical for durable, energy-efficient buildings. To address the need for research on wind-driven rain intrusion in wall assemblies, the U.S. Forest Products Laboratory is developing a new facility. This paper describes the underlying principle of this facility and its capabilities.

  15. A Sustainable and Holistic Approach to Design and Construction

    ERIC Educational Resources Information Center

    Bobadilla, Leo

    2010-01-01

    Building energy-efficient school facilities is not just about being "green." It is about providing high-performance facilities that are safe, healthy, and conducive to learning. It is also about building facilities that are cost-effective from their inception and in the long term. Many school districts are working under ever-tightening…

  16. 1. EXTERIOR SOUTHWEST CORNER VIEW, FACING NORTHEAST. BUILDING NO. 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR SOUTHWEST CORNER VIEW, FACING NORTHEAST. BUILDING NO. 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  17. 2. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  18. 4. EXTERIOR NORTHWEST CORNER VIEW, FACING SOUTHEAST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. EXTERIOR NORTHWEST CORNER VIEW, FACING SOUTHEAST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  19. 3. EXTERIOR NORTHEAST CORNER VIEW, FACING SOUTHWEST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. EXTERIOR NORTHEAST CORNER VIEW, FACING SOUTHWEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  20. Sample preparation methods for scanning electron microscopy of homogenized Al-Mg-Si billets: A comparative study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Österreicher, Johannes Albert; Kumar, Manoj

    Characterization of Mg-Si precipitates is crucial for optimizing the homogenization heat treatment of Al-Mg-Si alloys. Although sample preparation is key for high quality scanning electron microscopy imaging, most common methods lead to dealloying of Mg-Si precipitates. In this article we systematically evaluate different sample preparation methods: mechanical polishing, etching with various reagents, and electropolishing using different electrolytes. We demonstrate that the use of a nitric acid and methanol electrolyte for electropolishing a homogenized Al-Mg-Si alloy prevents the dissolution of Mg-Si precipitates, resulting in micrographs of higher quality. This preparation method is investigated in depth and the obtained scanning electron microscopymore » images are compared with transmission electron micrographs: the shape and size of Mg-Si precipitates appear very similar in either method. The scanning electron micrographs allow proper identification and measurement of the Mg-Si phases including needles with lengths of roughly 200 nm. These needles are β″ precipitates as confirmed by high resolution transmission electron microscopy. - Highlights: •Secondary precipitation in homogenized 6xxx Al alloys is crucial for extrudability. •Existing sample preparation methods for SEM are improvable. •Electropolishing with nitric acid/methanol yields superior quality in SEM. •The obtained micrographs are compared to TEM micrographs.« less

  1. 6. INTERIOR MAIN SPACE DETAIL VIEW, FACING EAST. BUILDING NO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. INTERIOR MAIN SPACE DETAIL VIEW, FACING EAST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  2. 5. INTERIOR MAIN SPACE DETAIL VIEW, FACING WEST. BUILDING NO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR MAIN SPACE DETAIL VIEW, FACING WEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  3. KSC-2010-1159

    NASA Image and Video Library

    2010-01-08

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, with the placement of the last outside wall of the Propellants North Administrative and Maintenance Facility, the "barn-raising" of the new "green" facility is complete. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  4. KSC-2010-1158

    NASA Image and Video Library

    2010-01-08

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, construction workers survey the last outside wall of the Propellants North Administrative and Maintenance Facility. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  5. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  6. Improving the explanation capabilities of advisory systems

    NASA Technical Reports Server (NTRS)

    Porter, Bruce; Souther, Art

    1993-01-01

    A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology; and (2) developing general methods and tools for building similar explanation facilities in other domains.

  7. Improving the explanation capabilities of advisory systems

    NASA Technical Reports Server (NTRS)

    Porter, Bruce; Souther, Art

    1994-01-01

    A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology, and (2) developing general methods and tools for building similar explanation facilities in other domains.

  8. International Micrographics Standards: Report of the 1979 Paris Meeting of ISO/TC171.

    ERIC Educational Resources Information Center

    Heynen, Jeffrey

    1980-01-01

    Describes a meeting of the technical committee on micrographics of the International Organization for Standardization, and fcuses on the committee's work relating to the reproduction of library materials within the general context of international standards-making activities. (FM)

  9. 76 FR 10429 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    .... Department of Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12-140...: Bring comments to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at....regulations.gov at any time or to the Docket Management Facility in Room W12-140 of the West Building Ground...

  10. 1. West elevations of barrier (Building 4216/E17) and Monitor Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. West elevations of barrier (Building 4216/E-17) and Monitor Building (4203/E-4). Barrier is built of wood infilled with earth, intended to protect Monitor Building from flying debris should anything at Test Stand 'A' explode. Building 4203/E-4 is built of reinforced concrete; equipment on top of it is cooling tower for refrigeration equipment in Test Stand 'A' machinery room. Electrical utility poles are typical at the facility, and carry 4,800 volts 3-phase alternating current. - Jet Propulsion Laboratory Edwards Facility, Test Stand A, Control Center, Edwards Air Force Base, Boron, Kern County, CA

  11. KSC-2010-1106

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the first wall of the Propellants North Administrative and Maintenance Facility is lifted into place. In the background is the 525-foot-tall Vehicle Assembly Building. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  12. 340 Facility secondary containment and leak detection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bendixsen, R.B.

    1995-01-31

    This document presents a preliminary safety evaluation for the 340 Facility Secondary Containment and Leak Containment system, Project W-302. Project W-302 will construct Building 340-C which has been designed to replace the current 340 Building and vault tank system for collection of liquid wastes from the Pacific Northwest Laboratory buildings in the 300 Area. This new nuclear facility is Hazard Category 3. The vault tank and related monitoring and control equipment are Safety Class 2 with the remainder of the structure, systems and components as Safety Class 3 or 4.

  13. KSC-2012-1852

    NASA Image and Video Library

    2012-02-17

    Industrial Area Construction: Located 5 miles south of Launch Complex 39, construction of the main buildings -- Operations and Checkout Building, Headquarters Building, and Central Instrumentation Facility – began in 1963. In 1992, the Space Station Processing Facility was designed and constructed for the pre-launch processing of International Space Station hardware that was flown on the space shuttle. Along with other facilities, the industrial area provides spacecraft assembly and checkout, crew training, computer and instrumentation equipment, hardware preflight testing and preparations, as well as administrative offices. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA

  14. Advanced building energy management system demonstration for Department of Defense buildings.

    PubMed

    O'Neill, Zheng; Bailey, Trevor; Dong, Bing; Shashanka, Madhusudana; Luo, Dong

    2013-08-01

    This paper presents an advanced building energy management system (aBEMS) that employs advanced methods of whole-building performance monitoring combined with statistical methods of learning and data analysis to enable identification of both gradual and discrete performance erosion and faults. This system assimilated data collected from multiple sources, including blueprints, reduced-order models (ROM) and measurements, and employed advanced statistical learning algorithms to identify patterns of anomalies. The results were presented graphically in a manner understandable to facilities managers. A demonstration of aBEMS was conducted in buildings at Naval Station Great Lakes. The facility building management systems were extended to incorporate the energy diagnostics and analysis algorithms, producing systematic identification of more efficient operation strategies. At Naval Station Great Lakes, greater than 20% savings were demonstrated for building energy consumption by improving facility manager decision support to diagnose energy faults and prioritize alternative, energy-efficient operation strategies. The paper concludes with recommendations for widespread aBEMS success. © 2013 New York Academy of Sciences.

  15. KSC-2011-1153

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony for the space agency's most environmentally friendly facility, the Propellants North Administrative and Maintenance Facility in Kennedy's Launch Complex 39 area. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  16. KSC-2011-1157

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, far right, shows off the environmentally friendly features of the new Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  17. KSC-2011-1148

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  18. KSC-2011-1159

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, far right, shows off the environmentally friendly features of the new Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  19. KSC-2011-1158

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, far left, shows off the environmentally friendly features of the new Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  20. KSC-2011-1146

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  1. Environmental practices for biomedical research facilities.

    PubMed Central

    Medlin, E L; Grupenhoff, J T

    2000-01-01

    As a result of the Leadership Conference on Biomedical Research and the Environment, the Facilities Committee focused its work on the development of best environmental practices at biomedical research facilities at the university and independent research facility level as well as consideration of potential involvement of for-profit companies and government agencies. The designation "facilities" includes all related buildings and grounds, "green auditing" of buildings and programs, purchasing of furnishings and sources, energy efficiency, and engineering services (lighting, heating, air conditioning), among other activities. The committee made a number of recommendations, including development of a national council for environmental stewardship in biomedical research, development of a system of green auditing of such research facilities, and creation of programs for sustainable building and use. In addition, the committee recommended extension of education and training programs for environmental stewardship, in cooperation with facilities managers, for all research administrators and researchers. These programs would focus especially on graduate fellows and other students, as well as on science labs at levels K--12. PMID:11121360

  2. Micrographics: A Bibliography of Sources.

    ERIC Educational Resources Information Center

    Thornberry, Patricia Lee; Michael, James D.

    This extensive micrographics bibliography, which includes citations drawn from a literature search and prepared bibliographies, covers microforms, microfiche, and microfilm. Sections include 3 pages of book citations, 6 pages citing ERIC documents, and 33 pages of journal citations. Topics covered include microform library usage and usage in other…

  3. FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), FIRST FLOOR SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), FIRST FLOOR SHOWING SAMPLE CORRIDORS AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL FACILITIES LAB, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051979. ALTERNATE ID NUMBER CPP-E-1979. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  4. Building 211 cyclotron characterization survey report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-03-30

    The Building 211 Cyclotron Characterization Survey includes an assessment of the radioactive and chemical inventory of materials stored within the facility; an evaluation of the relative distribution of accelerator-produced activation products within various cyclotron components and adjacent structures; measurement of the radiation fields throughout the facility; measurement and assessment of internal and external radioactive surface contamination on various equipment, facility structures, and air-handling systems; and an assessment of lead (Pb) paint and asbestos hazards within the facility.

  5. Hydrothermal synthesis of TiO2-ZnO-graphene nanocomposite towards photocatalytic and photovoltaic applications

    NASA Astrophysics Data System (ADS)

    Gayathri, S.; Jayabal, P.; Ramakrishnan, V.

    2015-06-01

    Titanium dioxide (TiO2) - Zinc oxide (ZnO) - Graphene (G) nanocomposite was successfully synthesized through facile hydrothermal method. The X-ray diffraction (XRD) pattern and the micro-Raman spectroscopic technique revealed the formation of TiO2-ZnO-Graphene (TZG) nanocomposite. The ZnO and TiO2 nanoparticles decorated graphene sheets were clearly noticeable in the Field Emission Scanning Electron Micrograph (FE-SEM). The UV-Visible absorption spectra clearly indicated that the formation of TZG nanocomposite enriched the absorption in the visible region. Hence, the prepared nanocomposite can be used as photocatalyst to remove organic dyes from water and as photoanode in the fabrication of dye sensitized solar cells (DSSCs).

  6. 75 FR 32837 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12-140, Washington, DC 20590. Fax... Docket Management Facility in Room W12-140 of the West Building Ground Floor at 1200 New Jersey Avenue... at any time or to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at...

  7. Single-Source Responsibility: An Innovative Way to Build College Sports, Fitness and Rec Facilities

    ERIC Educational Resources Information Center

    Wakely, Jim

    2013-01-01

    While schools wrestled with how to build a new athletic facility in the middle of a recession, Tufts University's Athletics and Operations Departments worked with a Massachusetts-based developer called Stanmar Inc. to devise a creative solution to designing, building and financing a new sports and fitness center in just under 24 months. Tufts was…

  8. 110. ARAI support facilities. Index of drawings related to initial ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    110. ARA-I support facilities. Index of drawings related to initial construction of hot cell building ARA-626, shop and maintenance building ARA-627, and other buildings at ARA-I. Date: Circa January 1959. Norman Engineering Company. Ineel index code no. 068-9999-80-613-102703. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  9. 76 FR 45648 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12-140, Washington, DC 20590. Fax... comments to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at 1200 New... at any time or to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at...

  10. 11. SITE BUILDING 002 SCANNER BUILDING EVAPORATIVE COOLING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. SITE BUILDING 002 - SCANNER BUILDING - EVAPORATIVE COOLING TOWER SYSTEM IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  11. Building a Sustained School Facilities Remedy: Arizona's Innovative Blueprint for Capital Funding. Education, Equity, and the Law. No. 3

    ERIC Educational Resources Information Center

    Hunter, Molly A.

    2010-01-01

    For over ten years, the State of Arizona has implemented an innovative statewide process for financing and building school facilities and purchasing other capital items for its schools. Spawned by an education quality lawsuit, the 1998 Students FIRST Act established the School Facilities Board, which succeeded in helping rural, suburban, and urban…

  12. OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING (FIRST-FLOOR CONCRETE PORTION) IN FOREGROUND. - U.S. Naval Base, Pearl Harbor, Combat Intelligence Center, Makalapa Drive in Makalapa Administration Area, Pearl City, Honolulu County, HI

  13. 4. Anode Building. View is to the east. This facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Anode Building. View is to the east. This facility, which was used for the cleaning and manufacture of anodes, was documented prior to demolition in 1993. - Sullivan Electrolytic Zinc Plant, Government Gulch, Kellogg, Shoshone County, ID

  14. 11 CFR 100.56 - Office building or facility for national party committees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... national party committees. A gift, subscription, loan, advance, or deposit of money or anything of value to a national party committee for the purchase or construction of an office building or facility is a...

  15. Using action research to build mentor capacity to improve orientation and quality of nursing students' aged care placements: what to do when the phone rings.

    PubMed

    Lea, Emma J; Andrews, Sharon; Stronach, Megan; Marlow, Annette; Robinson, Andrew L

    2017-07-01

    To describe whether an action research approach can be used to build capacity of residential aged care facility staff to support undergraduate nursing students' clinical placements in residential aged care facilities, using development of an orientation programme as an exemplar. Aged care facilities are unpopular sites for nursing students' clinical placements. A contributing factor is the limited capacity of staff to provide students with a positive placement experience. Strategies to build mentor capability to shape student placements and support learning and teaching are critical if nursing students are to have positive placements that attract them to aged care after graduation, an imperative given the increasing care needs of the ageing population worldwide. Action research approach employing mixed-methods data collection (primarily qualitative with a quantitative component). Aged care facility staff (n = 32) formed a mentor group at each of two Tasmanian facilities and met regularly to support undergraduate nursing students (n = 40) during placements. Group members planned, enacted, reviewed and reflected on orientation procedures to welcome students, familiarise them with the facility and prepare them for their placement. Data comprised transcripts from these and parallel student meetings, and orientation data from student questionnaires from two successive placement periods (2011/2012). Problems were identified in the orientation processes for the initial student placements. Mentors implemented a revised orientation programme. Evaluation demonstrated improved programme outcomes for students regarding knowledge of facility operations, their responsibilities and emergency procedures. Action research provides an effective approach to engage aged care facility staff to build their capacity to support clinical placements. Building capacity in the aged care workforce is vital to provide appropriate care for residents with increasing care needs. © 2016 John Wiley & Sons Ltd.

  16. KSC-2010-1160

    NASA Image and Video Library

    2010-01-08

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, this crane raised all of the outside walls of the Propellants North Administrative and Maintenance Facility over a period of two days. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  17. KSC-2010-1157

    NASA Image and Video Library

    2010-01-08

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, all of the exterior walls of the Propellants North Administrative and Maintenance Facility have been lifted into place. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  18. KSC-2010-1161

    NASA Image and Video Library

    2010-01-08

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, construction of the Propellants North Administrative and Maintenance Facility is moving ahead with the placement of all of the outside walls complete. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  19. KSC-2010-1156

    NASA Image and Video Library

    2010-01-08

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the last outside wall of the Propellants North Administrative and Maintenance Facility is lifted into place. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  20. Control Limits for Building Energy End Use Based on Engineering Judgment, Frequency Analysis, and Quantile Regression

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henze, Gregor P.; Pless, Shanti; Petersen, Anya

    2014-02-01

    Approaches are needed to continuously characterize the energy performance of commercial buildings to allow for (1) timely response to excess energy use by building operators; and (2) building occupants to develop energy awareness and to actively engage in reducing energy use. Energy information systems, often involving graphical dashboards, are gaining popularity in presenting energy performance metrics to occupants and operators in a (near) real-time fashion. Such an energy information system, called Building Agent, has been developed at NREL and incorporates a dashboard for public display. Each building is, by virtue of its purpose, location, and construction, unique. Thus, assessing buildingmore » energy performance is possible only in a relative sense, as comparison of absolute energy use out of context is not meaningful. In some cases, performance can be judged relative to average performance of comparable buildings. However, in cases of high-performance building designs, such as NREL's Research Support Facility (RSF) discussed in this report, relative performance is meaningful only when compared to historical performance of the facility or to a theoretical maximum performance of the facility as estimated through detailed building energy modeling.« less

  1. 2. SITE BUILDING 002 SCANNER BUILDING VIEW IS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. SITE BUILDING 002 - SCANNER BUILDING - VIEW IS LOOKING NORTH 80° WEST "B" FACE ALONG BUILDING "A" FACE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. A model for evaluating the environmental benefits of elementary school facilities.

    PubMed

    Ji, Changyoon; Hong, Taehoon; Jeong, Kwangbok; Leigh, Seung-Bok

    2014-01-01

    In this study, a model that is capable of evaluating the environmental benefits of a new elementary school facility was developed. The model is composed of three steps: (i) retrieval of elementary school facilities having similar characteristics as the new elementary school facility using case-based reasoning; (ii) creation of energy consumption and material data for the benchmark elementary school facility using the retrieved similar elementary school facilities; and (iii) evaluation of the environmental benefits of the new elementary school facility by assessing and comparing the environmental impact of the new and created benchmark elementary school facility using life cycle assessment. The developed model can present the environmental benefits of a new elementary school facility in terms of monetary values using Environmental Priority Strategy 2000, a damage-oriented life cycle impact assessment method. The developed model can be used for the following: (i) as criteria for a green-building rating system; (ii) as criteria for setting the support plan and size, such as the government's incentives for promoting green-building projects; and (iii) as criteria for determining the feasibility of green building projects in key business sectors. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. 03pd2227

    NASA Image and Video Library

    2003-07-23

    KENNEDY SPACE CENTER, FLA. – This view shows much of the Launch Complex 39 Area stretching beyond the Turn Basin in the foreground. The largest building is the 525-foot-tall Vehicle Assembly Building. In front of it is the Launch Control Center. Behind and to the left of the VAB are the Orbiter Processing Facility bays. At left are the Multi-Function Facility and Operations Support Building. At left of the Turn Basin is the Press Site, which comprises the NASA News Center, grandstand, TV studio and media buildings.

  4. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  5. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  6. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  7. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  8. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  9. KSC-2011-1147

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility listens to opening remarks made by Frank Kline, a NASA Construction of Facilities project manager. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  10. Metallography of Aluminum and Its Alloys : Use of Electrolytic Polishing

    NASA Technical Reports Server (NTRS)

    Jacquet, Pierre A

    1955-01-01

    Recent methods are described for electropolishing aluminum and aluminum alloys. Numerous references are included of electrolytic micrographic investigations carried out during the period 1948 to 1952. A detailed description of a commercial electrolytic polishing unit, suitable for micrographic examination of aluminum and its alloys, is included.

  11. Micrographics: A Quarter-Century Perspective.

    ERIC Educational Resources Information Center

    Ach, William K.

    2000-01-01

    Discusses the uses of micrographics in higher education, based on a 25-year period at Wake Forest University's (Winston-Salem, North Carolina) Library. Discusses acquisition of scholarly collections in microform on a subscription plan; the trend away from microopaques to microfiche and the advent of the reader-printer; improved access to microform…

  12. Archival Stability of Microfilm--A Technical Review.

    ERIC Educational Resources Information Center

    Materazzi, Albert R.

    The purpose of this report is to acquaint all personnel with some technical aspects of micrographics. The various film types used in the production of microfiche are discussed, including silver halide, diazo, and vesicular films. Other imaging systems used in micrographics are reviewed, and a basic introduction to sensitometry is given. The…

  13. KSC-2009-6796

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, concrete layers on either side of the high-density foam insulation of the Propellants North Administrative and Maintenance Facility's walls will prevent any transfer of radiant heat between the exterior and interior of the building. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  14. KSC-2009-6802

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, high-density foam insulation between the concrete layers of the Propellants North Administrative and Maintenance Facility's walls will prevent any transfer of radiant heat between the exterior and interior of the building. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  15. 40 CFR 132.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Species Act. Existing Great Lakes discharger is any building, structure, facility, or installation from... discharger is any building, structure, facility, or installation from which there is or may be a “discharge... monitoring of the contaminant. Quantitative structure activity relationship (QSAR) or structure activity...

  16. 7 CFR 3406.10 - Use of funds for facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE 1890 INSTITUTION CAPACITY BUILDING GRANTS PROGRAM Program Description § 3406.10 Use of funds for facilities. Under the 1890 Institution Capacity Building...

  17. 33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  18. RIVER CORRIDOR BUILDINGS 324 & 327 CLEANUP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BAZZELL, K.D.; SMITH, B.A.

    2006-02-09

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D&D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km{sup 2} (1 mi{sup 2})300 Area comprises only a small part of the 1517 km{sup 2} (586 mi{sup 2}) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D&D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Projectmore » for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building.« less

  19. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  20. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  1. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  2. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  3. Seismic assessment of Technical Area V (TA-V).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Medrano, Carlos S.

    The Technical Area V (TA-V) Seismic Assessment Report was commissioned as part of Sandia National Laboratories (SNL) Self Assessment Requirement per DOE O 414.1, Quality Assurance, for seismic impact on existing facilities at Technical Area-V (TA-V). SNL TA-V facilities are located on an existing Uniform Building Code (UBC) Seismic Zone IIB Site within the physical boundary of the Kirtland Air Force Base (KAFB). The document delineates a summary of the existing facilities with their safety-significant structure, system and components, identifies DOE Guidance, conceptual framework, past assessments and the present Geological and Seismic conditions. Building upon the past information and themore » evolution of the new seismic design criteria, the document discusses the potential impact of the new standards and provides recommendations based upon the current International Building Code (IBC) per DOE O 420.1B, Facility Safety and DOE G 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE Nuclear Facilities and Non-Nuclear Facilities.« less

  4. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  5. Handling Rapid Growth.

    ERIC Educational Resources Information Center

    Scheideman, Dale; Dufresne, Ray

    2001-01-01

    Nevada's Clark County, the fastest growing school district in the nation, uses a life-cycle facilities management approach that monitors the individual components of each building on a database. The district's 10-year building program is addressing facilities infrastructure renewal, deferred maintenance, replacement, and new school construction.…

  6. 18. SITE BUILDING 002 SCANNER BUILDING VIEW OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. SITE BUILDING 002 - SCANNER BUILDING - VIEW OF SITE SECURITY OFFICE ACCESS DOOR FROM EXTERIOR OF OFFICE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  7. 24. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER -- MWOC IN OPEARATION AT 1924 ZULU TIME. 26 OCTOBER, 1999. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. Evaluating the Maturity of Cybersecurity Programs for Building Control Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glantz, Clifford S.; Somasundaram, Sriram; Mylrea, Michael E.

    The cyber-physical security threat to buildings is complex, non-linear, and rapidly evolving as operational and information technologies converge and connect buildings to cyberspace. Cyberattacks on buildings can exploit smart building controls and breach corporate networks, causing financial and reputational damage. This may result in the loss of sensitive building information or the disruption of, or damage to, the systems necessary for the safe and efficient operation of buildings. For the buildings and facility infrastructure, there is a need for a robust national cybersecurity strategy for buildings, guidance on the selection and implementation of appropriate cybersecurity controls for buildings, an approachmore » to evaluate the maturity and adequacy of the cybersecurity programs. To provide an approach for evaluating the maturity of the cybersecurity programs for building control systems, the US Department of Energy’s widely used Cybersecurity Capability and Maturity Model (C2M2) has been adapted into a building control systems version. The revised model, the Buildings-C2M2 (B-C2M2) provides maturity level indicators for cybersecurity programmatic domains. A “B-C2M2 Lite” version allows facility managers and building control system engineers, or information technology personnel to perform rapid self-assessments of their cybersecurity program. Both tools have been pilot tested on several facilities. This paper outlines the concept of a maturity model, describes the B-C2M2 tools, presents results and observations from the pilot assessments, and lays out plans for future work.« less

  9. Savannah River Plant engineering and design history. Volume 4: 300/700 Areas & general services and facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1957-01-01

    The primary function of the 300 Area is the production and preparation of the fuel and target elements required for the 100 Area production reactors. Uranium slugs and lithium-aluminium alloy control and blanket rods are prepared in separate structures. Other facilities include a test pile, a physics assembly laboratory, an office and change house, an electrical substation, and various service facilities such as rail lines, roads, sewers, steam and water distribution lines, etc. The 700 Area contains housing and facilities for plant management, general plant services, and certain technical activities. The technical buildings include the Main Technical Laboratory, the Wastemore » Concentration Building, the Health Physics Headquarters, and the Health Physics Calibration building. Sections of this report describe the following: development of the 300-M Area; selection and description of process; design of main facilities of the 300 Area; development of the 700-A Area; design of the main facilities of the 700 Area; and general services and facilities, including transportation, plant protection, waste disposal and drainage, site work, pilot plants, storage, and furniture and fixtures.« less

  10. Building Toxic Metal Characterization and Decontamination Report: Area 6, Building 914

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Industrial Hygiene

    2011-08-15

    The purpose of this report is to outline the toxic metal characterization and decontamination efforts in Area 6, Building 914. This includes the initial building inspection, the hotspot sampling, results/findings, building cleanup, and the verification sampling. Building 914 is a steel light frame building that was constructed in 1992. It is about 16,454 square feet, and five employees are assigned to this building. According to the building's floor plan blueprints, it could be inferred that this building was once a Wiremen/Lineman shop. In 2002-2004, the National Nuclear Security Administration Nevada Site Office embarked on a broad characterization of beryllium (Be)more » surface concentrations throughout the North Las Vegas Facility, the Nevada National Security Site (NNSS), and ancillary facilities like the Special Technologies Laboratory, Remote Sensing Laboratory, etc. Building 914 was part of this characterization. The results of the 2002 study illustrated that the metal housekeeping limits were within acceptable limits and from a Be standpoint, the building was determined to be fit for occupancy. On March 2, 2011, based on a request from Building 914 users, National Security Technologies, LLC (NSTec) Industrial Hygiene (IH) collected bulk samples from the southwest corner of Building 914 at heights above 6 feet where black dust had been noticed on this particular wall. IH conducted surface swipe sampling of the area and analyzed the samples for toxic metals, namely, beryllium (Be), cadmium (Cd), chromium (Cr), lead (Pb), and manganese (Mn). The sample results indicated values two to four times above the housekeeping threshold for Be, Cd, Cr, Pb, and Mn. Subsequently, the facility was closed and posted; the necessary personnel were notified; and controls were instituted for ingress and egress of the building. On March 17, 2011, IH performed an extensive sampling event involving the entire warehouse in accordance with NSTec Organization Procedure OP-P250.004, Sampling Procedures. Analysis of the results from this exercise illustrated that toxic metal contamination was ubiquitous throughout the warehouse section of this building but did not extend into the office, restroom, and break room areas. On March 22, 2011, a planning meeting was held with Environment, Safety, Health & Quality management; Operations & Infrastructure (O&I) mangement; Facility Management; Occupational Medicine; O&I Operations; and IH. After a brief discussion concerning the salient facts of the surface sample results, it was agreed that the facility and its contents required cleaning. The facility would then be re-sampled to verify cleanliness and suitability for re-occupancy. On April 18, 2011, warehouse cleanup activites began. On July 5, 2011, upon receipt of the results from the last cleaned section, the cleanup operations were concluded. The building was statistically determined to be clean; thus, it could be reoccupied and the warehouse operations could resume immediately.« less

  11. Evaluating building performance in healthcare facilities: an organizational perspective.

    PubMed

    Steinke, Claudia; Webster, Lynn; Fontaine, Marie

    2010-01-01

    Using the environment as a strategic tool is one of the most cost-effective and enduring approaches for improving public health; however, it is one that requires multiple perspectives. The purpose of this article is to highlight an innovative methodology that has been developed for conducting comprehensive performance evaluations in public sector health facilities in Canada. The building performance evaluation methodology described in this paper is a government initiative. The project team developed a comprehensive building evaluation process for all new capital health projects that would respond to the aforementioned need for stakeholders to be more accountable and to better integrate the larger organizational strategy of facilities. The Balanced Scorecard, which is a multiparadigmatic, performance-based business framework, serves as the underlying theoretical framework for this initiative. It was applied in the development of the conceptual model entitled the Building Performance Evaluation Scorecard, which provides the following benefits: (1) It illustrates a process to link facilities more effectively to the overall mission and goals of an organization; (2) It is both a measurement and a management system that has the ability to link regional facilities to measures of success and larger business goals; (3) It provides a standardized methodology that ensures consistency in assessing building performance; and (4) It is more comprehensive than traditional building evaluations. The methodology presented in this paper is both a measurement and management system that integrates the principles of evidence-based design with the practices of pre- and post-occupancy evaluation. It promotes accountability and continues throughout the life cycle of a project. The advantage of applying this framework is that it engages health organizations in clarifying a vision and strategy for their facilities and helps translate those strategies into action and measurable performance outcomes.

  12. Facilities | Bioenergy | NREL

    Science.gov Websites

    Facilities Facilities At NREL's state-of-the-art bioenergy research facilities, researchers design options. Photo of interior of industrial, two-story building with high-bay, piping, and large processing

  13. An Investigation of Concrete Deterioration at South Florida Water Management District Structure S65E

    DTIC Science & Technology

    2014-02-01

    24 Figure 19. SEM micrographs of deterioration observed on fracture surface including borehole near exposed surface and transition between...photomicrographs of repaired concrete surface. ........................................ 36 Figure A6. Supplemental photomicrographs of fractured sample...38 Figure B1. Supplemental SEM micrographs of inner non-deteriorated concrete fracture surface

  14. Conductive Polymer Blends

    DTIC Science & Technology

    1988-04-26

    FIGURES Figure 1. Schematic of the suspension copolymerization approach ................ 8 Figure 2. SEM micrograph of fracture surface near molded...micrograph of fracture surface near molded edge of sample 1430-58b.............................................................. 18 Figure 12. SEM... caprolactam . The caprolactam (11.3 g) was placed in a large tube equipped with a nitrogen inlet, and heated under nitrogen to 80*C, whereupon

  15. Composition and Science: A Symbiotic Relationship.

    ERIC Educational Resources Information Center

    Coward, Pat; Taylor, Jo

    Critical thinking skills were taught to students in a lower-track freshman English class through the use of cross-disciplinary subject matter. Given a set of three transmission electron micrographs, or photographs of magnified tissue used in histology and pathology, students were asked to support their conclusions on which two of micrographs A, B,…

  16. Technology Solutions Case Study: Cold Climate Foundation Wall Hygrothermal Research Facility, Cloquet, Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2014-09-01

    This case study describes the University of Minnesota’s Cloquet Residential Research Facility (CRRF) in northern Minnesota, which features more than 2,500 ft2 of below-grade space for building systems foundation hygrothermal research. Here, the NorthernSTAR Building America Partnership team researches ways to improve the energy efficiency of the building envelope, including wall assemblies, basements, roofs, insulation, and air leakage.

  17. KSC-03pd2225

    NASA Image and Video Library

    2003-07-23

    CAPE CANAVERAL, Fla. -- This view shows much of the Launch Complex 39 Area looking north. At center is the 525-foot-tall Vehicle Assembly Building. Other buildings surrounding it are counter clockwise from left the Orbiter Processing Facility, Multi-Function Facility, Operations Support Building and Launch Control Center, next to the VAB. The crawlerway leads from the VAB toward the launch pads. In the background are the waters of the Banana Creek. Photo credit: NASA

  18. 03pd2225

    NASA Image and Video Library

    2003-07-23

    KENNEDY SPACE CENTER, FLA. – This view shows much of the Launch Complex 39 Area looking north. At center is the 525-foot-tall Vehicle Assembly Building. Other buildings surrounding it are (counter clockwise from left) the Orbiter Processing Facility, Multi-Function Facility, Operations Support Building and Launch Control Center (next to VAB). The crawlerway leads from the VAB toward the launch pads. In the background are the waters of the Banana Creek.

  19. 300 Area Building Retention Evaluation Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. J. McBride

    2007-07-03

    Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.

  20. Development of a Knowledge-Based System Approach for Decision Making in Construction Projects

    DTIC Science & Technology

    1992-05-01

    a generic model for an administrative facility and medical facility with predefined fixed building systems based on Air Force criteria and past...MAINTENANCE HANGAR (MEDIUM BAY) CORROSION CONTROL HANGAR (HIGH BAY) FUEL SYSTEM MAINTENANCE HANGAR (MEDIUM BAY) MEDICAL MODEL 82 Table 5-1--continued...BUILDING SUPPORT MEDICAL LOGISTICS MEDICAL TOTAL 85 Table 5-2--continued MISSILE ASSEMBLY AND MAINTENANCE BUILDING TOTAL MISSILE LOADING AND UNLOADING

  1. Facility Design and Health Management Program at the Sinnhuber Aquatic Research Laboratory

    PubMed Central

    Barton, Carrie L.; Johnson, Eric W.

    2016-01-01

    Abstract The number of researchers and institutions moving to the utilization of zebrafish for biomedical research continues to increase because of the recognized advantages of this model. Numerous factors should be considered before building a new or retooling an existing facility. Design decisions will directly impact the management and maintenance costs. We and others have advocated for more rigorous approaches to zebrafish health management to support and protect an increasingly diverse portfolio of important research. The Sinnhuber Aquatic Research Laboratory (SARL) is located ∼3 miles from the main Oregon State University campus in Corvallis, Oregon. This facility supports several research programs that depend heavily on the use of adult, larval, and embryonic zebrafish. The new zebrafish facility of the SARL began operation in 2007 with a commitment to build and manage an efficient facility that diligently protects human and fish health. An important goal was to ensure that the facility was free of Pseudoloma neurophilia (Microsporidia), which is very common in zebrafish research facilities. We recognize that there are certain limitations in space, resources, and financial support that are institution dependent, but in this article, we describe the steps taken to build and manage an efficient specific pathogen-free facility. PMID:26981844

  2. Facility Design and Health Management Program at the Sinnhuber Aquatic Research Laboratory.

    PubMed

    Barton, Carrie L; Johnson, Eric W; Tanguay, Robert L

    2016-07-01

    The number of researchers and institutions moving to the utilization of zebrafish for biomedical research continues to increase because of the recognized advantages of this model. Numerous factors should be considered before building a new or retooling an existing facility. Design decisions will directly impact the management and maintenance costs. We and others have advocated for more rigorous approaches to zebrafish health management to support and protect an increasingly diverse portfolio of important research. The Sinnhuber Aquatic Research Laboratory (SARL) is located ∼3 miles from the main Oregon State University campus in Corvallis, Oregon. This facility supports several research programs that depend heavily on the use of adult, larval, and embryonic zebrafish. The new zebrafish facility of the SARL began operation in 2007 with a commitment to build and manage an efficient facility that diligently protects human and fish health. An important goal was to ensure that the facility was free of Pseudoloma neurophilia (Microsporidia), which is very common in zebrafish research facilities. We recognize that there are certain limitations in space, resources, and financial support that are institution dependent, but in this article, we describe the steps taken to build and manage an efficient specific pathogen-free facility.

  3. Histopathologic pitfalls of Mohs micrographic surgery and a review of tumor histology.

    PubMed

    França, Katlein; Alqubaisy, Yasser; Hassanein, Ashraf; Nouri, Keyvan; Lotti, Torello

    2018-06-01

    Mohs micrographic surgery is a specialized subset of staged surgical excisions with each subsequent stage being driven largely by the histologic findings of the previous stage. Therefore, it is imperative that histologic analysis is performed in an accurate manner. Frozen section and tissue flattening is a crucial step in Mohs surgery. Frozen sections introduce certain artifacts and these artifacts must be interpreted in the correct context. Basal and squamous cell carcinomas are the most common tumors encountered in Mohs micrographic surgery, and their histopathology is also associated with certain "pitfalls". Basal cell carcinoma should be distinguished from hair follicles, folliculocentric basaloid proliferations, poromas, nevus sebaceous, desmoplastic trichoepitheliomas, and spiradenomas, to name but a few histologic entities. Similarly, squamous cell carcinoma should be distinguished from hypertrophic actinic keratoses, pseudoepitheliomatous hyperplasia, sebaceous carcinoma, and microcystic adnexal carcinoma. In addition, there are numerous subtypes of basal cell and squamous carcinomas that the Mohs surgeon should be aware of due to differences in the biologic behavior of these tumors. This review presents a number of the common histologic pitfalls of Mohs micrographic surgery and a review of tumor histology.

  4. Environmental analysis Waste Isolation Pilot Plant (WIPP) cost reduction proposals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States government. The facility is planned to be developed in bedded salt at the Los Medanos site in southeastern New Mexico. The environmental consequences of contruction and operation of the WIPP facility are documented in ''Final Environmental Impact Statement, Waste Isolation Pilot Plant''. The proposed action addressed by this environmental analysis is to simplify and reduce the scope of the WIPP facility as it is currently designed. The proposed changesmore » to the existing WIPP design are: limit the waste storage rate to 500,000 cubic feet per year; eliminate one shaft and revise the underground ventilation system; eliminate the underground conveyor system; combine the Administration Building, the Underground Personnel Building and the Waste Handling Building office area; simplify the central monitoring system; simplify the security control systems; modify the Waste Handling Building; simplify the storage exhaust system; modify the above ground salt handling logistics; simplify the power system; reduce overall site features; simplify the Warehouse/Shops Building and eliminate the Vehicle Maintenance Building; and allow resource recovery in Control Zone IV.« less

  5. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  6. Building a Foundation for Success: How Authorizers Can Help Schools with the Facilities Challenge. Authorizer Issue Brief. Number 2

    ERIC Educational Resources Information Center

    Halsband, Robin; Hassel, Bryan C.

    2004-01-01

    One of the single biggest challenges for a charter school is securing financing for an adequate facility. While a stellar building provides no guarantee that a school will be a success, having adequate facilities that at least meet the needs of an academic program without robbing the budget can go a long way toward creating an environment…

  7. 23. SITE BUILDING 002 SCANNER BUILDING RADAR CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. SITE BUILDING 002 - SCANNER BUILDING - RADAR CONTROL INTERFACE "RCL NO. 2" WITH COMPUTER CONTROL DISC DRIVE UNITS IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. DETECTION OF TOXICANT(S) ON BUILDING SURFACES FOLLOWING CHEMICAL ATTACK

    EPA Science Inventory

    A critical step prior to reoccupation of any facility following a chemical attack is monitoring for toxic compounds on surfaces within that facility. Low level detection of toxicant(s) is necessary to ensure that these compounds have been eliminated after building decontaminatio...

  9. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  10. 58. MILL BUILDING (BUILDING 1558): VIEW FROM SOUTHWEST, WITH V2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. MILL BUILDING (BUILDING 1558): VIEW FROM SOUTHWEST, WITH V-2 ASSEMBLY BUILDING IN BACKGROUND AT FAR RIGHT - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  11. 56. V2 ASSEMBLY BUILDING (BUILDING 1538): VIEW FROM NORTHEAST, WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. V-2 ASSEMBLY BUILDING (BUILDING 1538): VIEW FROM NORTHEAST, WITH MILL BUILDING IN BACKGROUND AT FAR RIGHT - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  12. Balancing Multiple Needs through Innovative Facility Design.

    ERIC Educational Resources Information Center

    Romano, C. Renee; Hanish, Jan

    2003-01-01

    Designing buildings that incorporate and integrate a number of departments and functions is one way that colleges and universities are balancing financial challenges and facility needs. These buildings can transform the campus, but they require planning and coordination from a carefully assembled design team. (Contains 18 references.) (Author)

  13. What Really Needs to Be Built?

    ERIC Educational Resources Information Center

    Gilbert, P. G.

    1991-01-01

    Discusses the development of a camp design brief that clarifies the specific priorities and criteria for building or expanding camp facilities. Presents three situations in which camp directors accurately diagnosed their facility problems but changed their building plans over time because of financial, operational, or locational considerations.…

  14. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G Street, NW., Washington, DC. The facility shall be open to...

  15. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G Street, NW., Washington, DC. The facility shall be open to...

  16. Aerial View of NACA's Lewis Flight Propulsion Research Laboratory

    NASA Image and Video Library

    1946-05-21

    The National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory in Cleveland, Ohio as seen from the west in May 1946. The Cleveland Municipal Airport is located directly behind. The laboratory was built in the early 1940s to resolve problems associated with aircraft engines. The initial campus contained seven principal buildings: the Engine Research Building, hangar, Fuels and Lubricants Building, Administration Building, Engine Propeller Research Building, Altitude Wind Tunnel, and Icing Research Tunnel. These facilities and their associated support structures were located within an area occupying approximately one-third of the NACA’s property. After World War II ended, the NACA began adding new facilities to address different problems associated with the newer, more powerful engines and high speed flight. Between 1946 and 1955, four new world-class test facilities were built: the 8- by 6-Foot Supersonic Wind Tunnel, the Propulsion Systems Laboratory, the Rocket Engine Test Facility, and the 10- by 10-Foot Supersonic Wind Tunnel. These large facilities occupied the remainder of the NACA’s semicircular property. The Lewis laboratory expanded again in the late 1950s and early 1960s as the space program commenced. Lewis purchased additional land in areas adjacent to the original laboratory and acquired a large 9000-acre site located 60 miles to the west in Sandusky, Ohio. The new site became known as Plum Brook Station.

  17. Building Awards | NREL

    Science.gov Websites

    Mountain campus is designed to meet the Gold or Platinum standards of the U.S. Green Building Council's Research Facility. South Site Entrance Building South Site Entrance Building 2013 U.S. Green Buildings Building Awards Building Awards NREL's high-performance buildings are sustainability models for the

  18. [STRATEGY OF USE AND MAINTENANCE OF CLINICAL HOSPITAL CENTER RIJEKA IN ACCORDANCE WITH KEY PERFORMANCE INDICATORS FOR STRATEGIC HEALTHCARE FACILITIES MAINTENANCE].

    PubMed

    Sjekavica, Mariela; Haller, Herman; Cerić, Anita

    2015-01-01

    Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.

  19. LAFD: TA-55 RLUOB/CUB Facility Familiarization Tour, OJT #55265

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutherford, Victor Stephen

    2017-09-14

    Los Alamos National Laboratory (LANL) conducts familiarization tours for personnel of the Los Alamos County Fire Department (LAFD) at the RLUOB/CUB, technical area (TA)-55, 400/440, facility, Radiological Laboratory Utility Office Building (RLUOB)/Central Utility Building (CUB). These familiarization tours are official LANL business; the purpose of these tours is to orient LAFD firefighters to the facility so that they can respond efficiently and quickly to a variety of emergency situations. This orientation includes, among other topics, the ingress and egress of the area and buildings, layout and organization of the facility, evacuation procedures and assembly points, and areas of concern withinmore » the various buildings at the facility. LAFD firefighters have the skills and abilities to perform firefighting operations and other emergency response tasks that cannot be provided by other LANL personnel who have the required clearance level. This handout provides details of the information, along with maps and diagrams, to be presented during the familiarization tours. The handout is distributed to the trainees at the time of the tour; a corresponding checklist is also used as guidance during the familiarization tours to ensure that all required information is presented to LAFD personnel.« less

  20. View showing base of Building 70021 with Building 70022 in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View showing base of Building 70021 with Building 70022 in background, facing southeast - Naval Ordnance Test Station Inyokern, Randsburg Wash Facility Target Test Towers, Tower Road, China Lake, Kern County, CA

  1. Detail view of base of Building 70021, showing Building 70022 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail view of base of Building 70021, showing Building 70022 (background), facing southeast - Naval Ordnance Test Station Inyokern, Randsburg Wash Facility Target Test Towers, Tower Road, China Lake, Kern County, CA

  2. 76 FR 63913 - Commercial Building Workforce Job/Task Analyses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ..., Commercial Building Energy Modeler, Commissioning/Retro-Commissioning Authority, Energy/Sustainability..., Commercial Building Energy Modeler, Commissioning/Retro-Commissioning Authority, Energy/Sustainability...-commissioning authority, energy/sustainability manager, facility manager, and/or operating engineer/building...

  3. Building 1100--NASA

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Building 1100 is the NASA administrative building. Services located in this building include two banks, a post office, barber shop, cafeteria, snack bar, travel agency, dry cleaners, the NASA Exchange retail store and medical facilities for employees.

  4. Plasma assisted facile synthesis of vanadium oxide (V3O7) nanostructured thin films

    NASA Astrophysics Data System (ADS)

    Singh, Megha; Saini, Sujit K.; Kumar, Prabhat; Sharma, Rabindar K.; Reddy, G. B.

    2018-05-01

    Vanadium oxides nanostructured thin films are synthesized using plasma assisted sublimation process. The effect of temperatures on growth of V2O5 and V3O7 thin films is studied. Scanning electron micrographs shows different morphologies are obtained at different temperatures i.e. at 450 °C nano cubes-like structures are obtained, whereas at 550 °C and 650 °C nanorods are obtained. Sample deposited at 450 °C is entirely composed of V2O5 and sample at higher temperatures are composed of mixed phase of vanadium oxides i.e. V2O5 and V3O7. As temperature increased, so the content of V3O7 in the sample is increased as confirmed by XRD and Raman analyses.

  5. Profiling with the electron microscope.

    NASA Technical Reports Server (NTRS)

    Vedder, J. F.; Lem, H. Y.

    1972-01-01

    Discussion of a profiling technique using a scanning electron microscope for obtaining depth information on a single micrograph of a small specimen. A stationary electron beam is used to form a series of contamination spots in a line across the specimen. Micrographs obtained by this technique are useful as a means of projection and display where stereo viewers are not practical.

  6. Optical Waveguide Scattering Reduction. II.

    DTIC Science & Technology

    1980-12-01

    Direct Methods..........................13 Topographical Approaches ................... 13 Nomarski Microscopy ................... 13 TIR Microscopy...6 3 Nomarski micrograph showing artifacts near the edge of a Ti- diffused LiNbO3 waveguide (50OX) ....... ................ 9...4 Nomarski micrograph showing the results of a 10 min heat treat- ment of LiNbO 3 at 850’C in flowing 02 ... ............. ... 12 5 Nomarski

  7. 50 CFR 86.20 - What activities are eligible for funding?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or privately owned boating infrastructure tie-up facilities. To be eligible you must: (1) Build these... nontrailerable recreational vessels; (3) Build these tie-up facilities in water deep enough for nontrailerable... fluctuation); (4) Provide security, safety, and service for these boats; and, (5) Install a pumpout station...

  8. 50 CFR 86.20 - What activities are eligible for funding?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or privately owned boating infrastructure tie-up facilities. To be eligible you must: (1) Build these... nontrailerable recreational vessels; (3) Build these tie-up facilities in water deep enough for nontrailerable... fluctuation); (4) Provide security, safety, and service for these boats; and, (5) Install a pumpout station...

  9. 50 CFR 86.20 - What activities are eligible for funding?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... publicly or privately owned boating infrastructure tie-up facilities. To be eligible you must: (1) Build... transient nontrailerable recreational vessels; (3) Build these tie-up facilities in water deep enough for... of lowest fluctuation); (4) Provide security, safety, and service for these boats; and, (5) Install a...

  10. Construction alternatives for free-standing facilities.

    PubMed

    Brown, G

    1990-01-01

    Many hospitals are exploring free-standing facilities as an option for providing more efficient imaging services. Mr. Brown discusses the pros and cons of an emerging building technology, manufactured construction, in which building and site preparation are done simultaneously. He presents the criteria managers should use to make a knowledgeable decision.

  11. Facilities of Environmental Distinction

    ERIC Educational Resources Information Center

    Pascopella, Angela

    2011-01-01

    Three of nine school buildings that have won the latest Educational Facility Design Awards from the American Institute of Architects (AIA) Committee on Architecture for Education stand out from the crowd of other school buildings because they are sustainable and are connected to the nature that surrounds them. They are: (1) Thurston Elementary…

  12. 75 FR 60745 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy... construction and operation of the nuclear facility portion of the Chemistry and Metallurgy Research Building... Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos...

  13. Educational Building and Facilities in the Asian Region. Bulletin No. 17.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and Oceania.

    Educational facilities analyzed in this bulletin are in the countries of the Republic of Afghanistan, Australia, Bangladesh, India, Japan, Republic of Korea, Malaysia, Nepal, New Zealand, Pakistan, Singapore, Sri Lanka, and Thailand. The first section reviews the historical reasons for different stages of school building development in the…

  14. Building Renovation in ARL Libraries. SPEC Kit 97.

    ERIC Educational Resources Information Center

    Hersberger, Rodney M.

    This collection of library documents related to building renovation, by members of the Association of Research Libraries (ARL), contains excerpts from: (1) a plan for upgrading and expanding library facilities at the University of Kansas; (2) a report on storage facilities at Rutgers University; (3) documents presenting the essential remodeling…

  15. 78 FR 44455 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Sonoma County, California. The Site's main property contains a manufacturing building and adjoining... corner of the manufacturing facility. The Site building is currently occupied by three companies, which.... Sola manufactured ophthalmic lenses at the facility from 1978 through 2001. The manufacturing process...

  16. Smart Homes and Buildings Research at the Energy Systems Integration Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christensen, Dane; Sparn, Bethany; Hannegan, Bryan

    Watch how NREL researchers are using the unique capabilities of the Energy Systems Integration Facility (ESIF) to develop technologies that will help the “smart” homes and buildings of the future perform efficiently and communicate effectively with the electricity grid while enhancing occupants' comfort and convenience.

  17. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  18. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  19. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  20. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  1. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  2. KSC-2009-6795

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - Concrete covers the insulation in the walls for the Propellants North Administrative and Maintenance Facility in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  3. KSC-2009-6801

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the walls for the Propellants North Administrative and Maintenance Facility get a layer of high-density foam insulation. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  4. KSC-2010-1110

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, one of the walls of the Propellants North Administrative and Maintenance Facility is lowered into the trench which will support it. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  5. KSC-2009-6799

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - Construction of the walls for the Propellants North Administrative and Maintenance Facility begins in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  6. KSC-2010-1109

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, workers guide one of the walls of the Propellants North Administrative and Maintenance Facility into place. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  7. KSC-2010-1120

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the final shape of the Propellants North Administrative and Maintenance Facility becomes apparent as its walls are erected. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  8. KSC-2010-1117

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a team of construction workers ensures that the walls of the Propellants North Administrative and Maintenance Facility are installed properly. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  9. KSC-2010-1115

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a crane is enlisted to lift the walls of the Propellants North Administrative and Maintenance Facility into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  10. KSC-2010-1112

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the Propellants North Administrative and Maintenance Facility begins to take shape as its walls are lifted into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  11. KSC-2010-1111

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the Propellants North Administrative and Maintenance Facility begins to take shape as its walls are lifted into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  12. KSC-2009-6800

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - Insulation is placed in the walls for the Propellants North Administrative and Maintenance Facility in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  13. KSC-2010-1108

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, one of the walls of the Propellants North Administrative and Maintenance Facility glides through the air into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  14. KSC-2010-1118

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a row of walls is erected as the Propellants North Administrative and Maintenance Facility takes shape. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  15. KSC-2010-1121

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, reminiscent of a barn-raising, the Propellants North Administrative and Maintenance Facility springs into being in a single day as its walls are lifted into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  16. KSC-2010-1119

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, steady progress is made by a team of construction workers to erect the walls of the Propellants North Administrative and Maintenance Facility. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  17. KSC-2009-6793

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - Concrete is poured over the insulation in the walls for the Propellants North Administrative and Maintenance Facility in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  18. KSC-2010-1107

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, workers lift one of the walls of the Propellants North Administrative and Maintenance Facility into an upright position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  19. KSC-2010-1116

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, man and machine work side by side to position the walls of the Propellants North Administrative and Maintenance Facility. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  20. KSC-2010-1113

    NASA Image and Video Library

    2010-01-07

    CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a worker is seen through an opening left for a doorway in a newly erected wall of the Propellants North Administrative and Maintenance Facility. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  1. Energy Efficiency in Water and Wastewater Facilities

    EPA Pesticide Factsheets

    Learn how local governments have achieved sustained energy improvements at their water and wastewater facilities through equipment upgrades, operational modifications, and modifications to facility buildings.

  2. KSC-2014-4149

    NASA Image and Video Library

    2014-09-25

    CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 make the first run past the Orbiter Processing Facility and Thermal Protection System Facility in Launch Complex 39 at NASA’s Kennedy Space Center in Florida during the Rail Vibration Test for the Canaveral Port Authority. Seismic monitors are collecting data as the train passes by. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper

  3. KSC-2010-5896

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- The Vehicle Assembly Building towers over the new Propellants North Administrative and Maintenance Facility in the Launch Complex 39 area of NASA's Kennedy Space Center in Florida. The environmentally friendly facility is slated to be NASA's second Platinum-rated by the U.S. Green Building Council's (USGBC) Leadership in Environmental and Energy Design (LEED) certification system. It will be the space agency's first carbon-neutral facility, which means it will produce enough energy onsite from renewable sources to offset what it requires to operate. On the right is the facility's two-story administrative building, which will house managers, mechanics and technicians who fuel spacecraft at Kennedy. On the left is a single-story shop that will be used to store cryogenic fuel transfer equipment. In the parking lot is a solar-powered parking station for alternative fuel vehicles. Photo credit: NASA/Frank Michaux

  4. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  5. View of hoist southeast of Building 70022. facing northwest. Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of hoist southeast of Building 70022. facing northwest. Building 70022 is in background - Naval Ordnance Test Station Inyokern, Randsburg Wash Facility Target Test Towers, Tower Road, China Lake, Kern County, CA

  6. 1. WEST SIDE, NORTH END OF BUILDING 1. SHOWS ADDITIONAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST SIDE, NORTH END OF BUILDING 1. SHOWS ADDITIONAL ANGLES IN BUILDING AT SOUTHERN END. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA

  7. 5. SITE BUILDING 002 SCANNER BUILDING AT "A" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 90MM STANDARD LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. An image, looking southeast down the passage between E Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    An image, looking southeast down the passage between E Building and M Building immediately to the east. The east entrance and the south wing of the building are visible - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  9. Human Health Science Building Geothermal Heat Pump Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leidel, James

    2014-12-22

    The grant objectives of the DOE grant funded project have been successfully completed. The Human Health Building (HHB) was constructed and opened for occupancy for the Fall 2012 semester of Oakland University. As with any large construction project, some issues arose which all were overcome to deliver the project on budget and on time. The facility design is a geothermal / solar-thermal hybrid building utilizing both desiccant dehumidification and variable refrigerant flow heat pumps. It is a cooling dominant building with a 400 ton cooling design day load, and 150 ton heating load on a design day. A 256 verticalmore » borehole (320 ft depth) ground source heat pump array is located south of the building under the existing parking lot. The temperature swing and performance over 2013 through 2015 shows the ground loop is well sized, and may even have excess capacity for a future building to the north (planned lab facility). The HHB achieve a US Green Building Counsel LEED Platinum rating by collecting 52 of the total 69 available LEED points for the New Construction v.2 scoring checklist. Being Oakland's first geothermal project, we were very pleased with the building outcome and performance with the energy consumption approximately 1/2 of the campus average facility, on a square foot basis.« less

  10. Department of the Army Justification of Estimates for Fiscal Year 1985. Procurement Appropriations-Construction Program Submitted to Congress February 1984. DD Forms 1391.

    DTIC Science & Technology

    1984-02-01

    REQUIREMENT FOR CONSTRUCTION PROJECT: These buildings house electronic equipment, irreplaceable rocket motor design and performance records, a...consists of five subprojects which are to provide modern facilities designed for rocket motor production. These production efficient buildings will...replace facilities which were designed and built in 1930-1942 for artillery shell loading. Four of the sub- projects are for buildings while the fifth

  11. LPT. Aerial of low power test facility (TAN640 and 641) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Aerial of low power test facility (TAN-640 and -641) and shield test facility (TAN-645 and -646). Camera facing south. Low power reactor cells at left, then one-story control building; diagonal fence; shield test control building, then (high-bay) pool room. In foreground are electrical pad, water tanks and guard house. Photographer: Lowin. Date: February 24, 1965. INEEL negative no. 65-987 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  12. KSC-2011-1149

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Mike Benik, the director of Center Operations at NASA's Kennedy Space Center in Florida, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  13. KSC-2011-1150

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- The director of NASA's Kennedy Space Center in Florida, Bob Cabana, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  14. KSC-2011-1151

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- The director of NASA's Kennedy Space Center in Florida, Bob Cabana, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  15. Performance evaluation of the Solar Building Test Facility

    NASA Technical Reports Server (NTRS)

    Jensen, R. N.

    1981-01-01

    The general performance of the NASA Solar Building Test Facility (SBTF) and its subsystems and components over a four year operational period is discussed, and data are provided for a typical one year period. The facility consists of a 4645 sq office building modified to accept solar heated water for operation of an absorption air conditioner and a baseboard heating system. An adjoining 1176 sq solar flat plate collector field with a 114 cu tank provides the solar heated water. The solar system provided 57 percent of the energy required for heating and cooling on an annual basis. The average efficiency of the solar collectors was 26 percent over a one year period.

  16. Identification of cost effective energy conservation measures

    NASA Technical Reports Server (NTRS)

    Bierenbaum, H. S.; Boggs, W. H.

    1978-01-01

    In addition to a successful program of readily implemented conservation actions for reducing building energy consumption at Kennedy Space Center, recent detailed analyses have identified further substantial savings for buildings representative of technical facilities designed when energy costs were low. The techniques employed for determination of these energy savings consisted of facility configuration analysis, power and lighting measurements, detailed computer simulations and simulation verifications. Use of these methods resulted in identification of projected energy savings as large as $330,000 a year (approximately two year break-even period) in a single building. Application of these techniques to other commercial buildings is discussed

  17. Review of free software tools for image analysis of fluorescence cell micrographs.

    PubMed

    Wiesmann, V; Franz, D; Held, C; Münzenmayer, C; Palmisano, R; Wittenberg, T

    2015-01-01

    An increasing number of free software tools have been made available for the evaluation of fluorescence cell micrographs. The main users are biologists and related life scientists with no or little knowledge of image processing. In this review, we give an overview of available tools and guidelines about which tools the users should use to segment fluorescence micrographs. We selected 15 free tools and divided them into stand-alone, Matlab-based, ImageJ-based, free demo versions of commercial tools and data sharing tools. The review consists of two parts: First, we developed a criteria catalogue and rated the tools regarding structural requirements, functionality (flexibility, segmentation and image processing filters) and usability (documentation, data management, usability and visualization). Second, we performed an image processing case study with four representative fluorescence micrograph segmentation tasks with figure-ground and cell separation. The tools display a wide range of functionality and usability. In the image processing case study, we were able to perform figure-ground separation in all micrographs using mainly thresholding. Cell separation was not possible with most of the tools, because cell separation methods are provided only by a subset of the tools and are difficult to parametrize and to use. Most important is that the usability matches the functionality of a tool. To be usable, specialized tools with less functionality need to fulfill less usability criteria, whereas multipurpose tools need a well-structured menu and intuitive graphical user interface. © 2014 Fraunhofer-Institute for Integrated Circuits IIS Journal of Microscopy © 2014 Royal Microscopical Society.

  18. KSC-2011-1342

    NASA Image and Video Library

    2011-02-02

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, KSC firefighters were on the scene after a backhoe inadvertently struck a natural gas line at around 8:40 a.m. EST in the area north of the Multi Function Facility (MFF). As a precaution, personnel were evacuated from Orbiter Processing Facilities 1 and 2, the MFF, Processing Control Center and Operations Support Building (OSB) I. All traffic was blocked on the Saturn Causeway near the facilities. There were no injuries or damage to any facilities and personnel were allowed back into their buildings before mid-day and the roadway open to traffic. Photo credit: NASA/Jack Pfaller

  19. 1. VIEW LOOKING NORTH IN SHOP AREA. BUILDING 15 ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW LOOKING NORTH IN SHOP AREA. BUILDING 15 ON RIGHT, BUILDING 22 ON LEFT, AND BUILDING 1 IN DISTANCE. - Chollas Heights Naval Radio Transmitting Facility, 6410 Zero Road, San Diego, San Diego County, CA

  20. IBIS integrated biological imaging system: electron micrograph image-processing software running on Unix workstations.

    PubMed

    Flifla, M J; Garreau, M; Rolland, J P; Coatrieux, J L; Thomas, D

    1992-12-01

    'IBIS' is a set of computer programs concerned with the processing of electron micrographs, with particular emphasis on the requirements for structural analyses of biological macromolecules. The software is written in FORTRAN 77 and runs on Unix workstations. A description of the various functions and the implementation mode is given. Some examples illustrate the user interface.

  1. The Readability of Online Patient Information About Mohs Micrographic Surgery.

    PubMed

    Vargas, Christina R; DePry, Jennifer; Lee, Bernard T; Bordeaux, Jeremy S

    2016-10-01

    Mohs micrographic surgery has become increasingly used in the treatment of cutaneous malignancies over the past decade. Concurrently, more patients are using the Internet as a resource for medical information than ever before. The average American adult reads at an eighth grade level. The American Medical Association and National Institutes of Health have recommended a sixth grade target reading level for patient health materials. This study evaluates the readability of currently available online information about Mohs micrographic surgery in the context of these recommendations. An Internet search for the term "Mohs surgery" was performed and the first 10 results were identified. Patient information from each primary site was downloaded and formatted into plain text. Readability was assessed using 9 established tests; text was analyzed both overall and by Web site for comparison. A total of 101 articles were collected from the first 10 Web site search results; the overall average reading level was 14.4. All articles exceeded the recommended sixth grade reading level. Online resources about Mohs micrographic surgery are too difficult for many patients to read. The paucity of appropriately written patient information available on the Internet may hinder informed decision-making, participation, and subsequent postoperative satisfaction.

  2. 6. SITE BUILDING 002 SCANNER BUILDING AT "A" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 65MM WIDE ANGLE LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. Space Planning for Laboratory Buildings | Climate Neutral Research Campuses

    Science.gov Websites

    facilities such as warehouses, offices, and high-tech laboratories have very different energy requirements , and a successful climate action plan will set aside adequate space for different activities. The Facility offices are housed in a different portion of the building than labs, resulting in lower cost

  4. LPT. Shield test facility test building interior (TAN646). Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility test building interior (TAN-646). Camera facing south. Distant pool contained EBOR reactor; near pool was intended for fuel rod storage. Other post-1970 activity equipment remains in pool. INEEL negative no. HD-40-9-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  5. LPT. Shield test facility test building interior (TAN646). Camera points ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility test building interior (TAN-646). Camera points down into interior of north pool. Equipment on wall is electronical bus used for post-1970 experiment. Personnel ladder at right. INEEL negative no. HD-40-9-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  6. ARCHITECTURE FOR ADULT EDUCATION. A GRAPHIC GUIDE FOR THOSE WHO ARE PLANNING PHYSICAL FACILITIES FOR ADULT EDUCATION.

    ERIC Educational Resources Information Center

    BECKER, JOHN W.

    THIS BOOK IS DESIGNED PARTICULARLY FOR THOSE PLANNING PHYSICAL FACILITIES FOR ADULT EDUCATION. FLOOR PLANS, PHOTOGRAPHS AND DISCUSSION ARE GIVEN FOR BUILDINGS USED FOR HOSPITALS, HEALTH CENTERS, INDUSTRY, ELEMENTARY SCHOOLS, HIGH SCHOOLS, COLLEGE BUILDINGS, FINE ARTS, LIBRARIES, RECREATION COMMUNITY CENTERS, AND ADULT EDUCATION. COPIES OF THIS…

  7. Designs for Success: Massive Building Project Makes LACCD a Leader in Green Facilities

    ERIC Educational Resources Information Center

    LaVista, Daniel

    2010-01-01

    After a 35-year building hiatus, the nine colleges in the Los Angeles Community College District (LACCD) needed a major facelift. Facilities on LACCD campuses were antiquated and had fallen into disrepair. For years, students voiced dismay, saying their campuses resembled high schools rather than colleges. Inadequate infrastructure drove many…

  8. Fusion Building: New Trend with Some Old Roots

    ERIC Educational Resources Information Center

    Hamilton, Craig

    2009-01-01

    The focus on the quality of a student's entire academic experience has led to a greater emphasis on student life activities and facilities. In response, many campuses are renovating, expanding, or creating new buildings that support student life. While many of these are traditional stand-alone student dormitories, dining facilities, unions, and…

  9. Athletic Facilities: Planning, Designing, and Operating Today's Physical-Education Centers.

    ERIC Educational Resources Information Center

    Spoor, Dana L.

    1998-01-01

    Examines what should be featured in an athletic facility, how to plan for the many different sports and activities that will be housed, and how to get the community involved. Areas addressed include planning for locker rooms and storage, flooring and lighting, building code adherence, spectator seating, building security, and outdoor recreation…

  10. 43. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), DETAIL OF EXPLOSION-PROOF ELECTRICAL SWITCH BOX (SWITCH GEAR INSIDE BOX SUBMERGED IN OIL TO QUENCH SPARKS), SWITCH EQUIPMENT MADE BY GENERAL ELECTRIC. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  11. Smart Homes and Buildings Research at the Energy Systems Integration Facility

    ScienceCinema

    Christensen, Dane; Sparn, Bethany; Hannegan, Bryan

    2018-01-16

    Watch how NREL researchers are using the unique capabilities of the Energy Systems Integration Facility (ESIF) to develop technologies that will help the “smart” homes and buildings of the future perform efficiently and communicate effectively with the electricity grid while enhancing occupants' comfort and convenience.

  12. Maintaining Sustainability for Green Schools

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2011-01-01

    The promise of sustainably designed school facilities is that they will operate more efficiently and last longer than buildings constructed in more traditional ways. But that promise comes with a big if. The payoff is delivered only if the facility managers operate and maintain the buildings in ways that adhere to sustainable strategies called for…

  13. An Archeological Overview and Management Plan for the Harry Diamond Laboratories-Woodbridge Research Facility.

    DTIC Science & Technology

    1985-07-01

    Radar (ISR) facility east of Lake Drive; h) a 40 ft. by 50 ft. command and control building at the Vertical Electromagnetic Pulse Simulator ( VEMPS ) west...Construction and fill operations could bury and extant archeological resources. The four command and control buildings (CW, ISR, VEMPS and REPS) will

  14. 36 CFR 1281.16 - What standard does NARA use for measuring building size?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What standard does NARA use for measuring building size? 1281.16 Section 1281.16 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.16 What standard...

  15. 26 CFR 1.148-7 - Spending exceptions to the rebate requirement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... finance a new office building. A uses proceeds of the bonds to purchase materials to be used in... contributes its ratable share of the cost of building the new facility to the project manager for the facility... expectations test for future earnings. For purposes of determining compliance with the spending requirements as...

  16. 26 CFR 1.148-7 - Spending exceptions to the rebate requirement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... finance a new office building. A uses proceeds of the bonds to purchase materials to be used in... contributes its ratable share of the cost of building the new facility to the project manager for the facility... expectations test for future earnings. For purposes of determining compliance with the spending requirements as...

  17. 26 CFR 1.148-7 - Spending exceptions to the rebate requirement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... finance a new office building. A uses proceeds of the bonds to purchase materials to be used in... contributes its ratable share of the cost of building the new facility to the project manager for the facility... expectations test for future earnings. For purposes of determining compliance with the spending requirements as...

  18. SPERTI Reactor Pit Building (PER605) from contrasting direction as photo ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Reactor Pit Building (PER-605) from contrasting direction as photo above (ID-33-F-32). Note Guard House door, security fencing around facility. Photographer: R.G. Larsen. Date: July 22, 1955. INEEL negative no. 55-1702. - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  19. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  20. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  1. BUILDING 122 CONTAINS THREE GENERAL AREAS: OFFICE AREAS, INTERNAL DOSIMETRY, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BUILDING 122 CONTAINS THREE GENERAL AREAS: OFFICE AREAS, INTERNAL DOSIMETRY, AND MEDICAL/HEALTH. BUILDING 122 SHARES A COMMON WALL WITH BUILDING 121, THE PLANT SECURITY BUILDING. THE TWO-STORY BUILDING IN THE BACKGROUND IS BUILDING 111. (9/26/52) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  2. Greening EPA

    EPA Pesticide Factsheets

    EPA ensures its buildings and practices reflect our mission by implementing strategies to reduce the environmental impact of its facilities and operations by building sustainable structures and improving the energy efficiency of older buildings.

  3. 7. WINDOW DETAIL SOUTHERN WALL OF BUILDING. (SOUTH SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. WINDOW DETAIL SOUTHERN WALL OF BUILDING. (SOUTH SIDE OF BUILDING 4 IS NOW WITHIN BUILDING 40 GARAGE.) - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA

  4. 3. VIEW SHOWING RELATIONSHIP OF EAST SIDES OF BUILDINGS 15 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW SHOWING RELATIONSHIP OF EAST SIDES OF BUILDINGS 15 ON LEFT, BUILDING 40 GARAGE IN CENTER, AND BUILDING 4 IN DISTANCE. - Chollas Heights Naval Radio Transmitting Facility, 6410 Zero Road, San Diego, San Diego County, CA

  5. Building Air Quality Guide: A Guide for Building Owners and Facility Managers

    EPA Pesticide Factsheets

    The Building Air Quality, developed by the EPA and the National Institute for Occupational Safety and Health, provides practical suggestions on preventing, identifying, and resolving indoor air quality (IAQ) problems in public and commercial buildings.

  6. Final report of the decontamination and decommissioning of the BORAX-V facility turbine building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arave, A.E.; Rodman, G.R.

    1992-12-01

    The Boiling Water Reactor Experiment (BORAX)-V Facility Turbine Building Decontamination and Decommissioning (D&D) Project is described in this report. The BORAX series of five National Reactor Testing Station (NRTS) reactors pioneered intensive work on boiling water reactor (BWR) experiments conducted between 1953 and 1964. Facility characterization, decision analyses, and D&D plans for the turbine building were prepared from 1979 through 1990. D&D activities of the turbine building systems were initiated in November of 1988 and completed with the demolition and backfill of the concrete foundation in March 1992. Due to the low levels of radioactivity and the absence of loosemore » contamination, the D&D activities were completed with no radiation exposure to the workers. The D&D activities were performed in a manner that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) remain.« less

  7. Final report of the decontamination and decommissioning of the BORAX-V facility turbine building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arave, A.E.; Rodman, G.R.

    1992-12-01

    The Boiling Water Reactor Experiment (BORAX)-V Facility Turbine Building Decontamination and Decommissioning (D D) Project is described in this report. The BORAX series of five National Reactor Testing Station (NRTS) reactors pioneered intensive work on boiling water reactor (BWR) experiments conducted between 1953 and 1964. Facility characterization, decision analyses, and D D plans for the turbine building were prepared from 1979 through 1990. D D activities of the turbine building systems were initiated in November of 1988 and completed with the demolition and backfill of the concrete foundation in March 1992. Due to the low levels of radioactivity and themore » absence of loose contamination, the D D activities were completed with no radiation exposure to the workers. The D D activities were performed in a manner that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) remain.« less

  8. Final Assessment: U.S. Virgin Islands Industrial Development Park and Adjacent Facilities Energy-Efficiency and Micro-Grid Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, Joseph M.; Boyd, Paul A.; Dahowski, Robert T.

    The purpose of this assessment was to undertake an assessment and analysis of cost-effective options for energy-efficiency improvements and the deployment of a micro-grid to increase the energy resilience at the U.S. Virgin Islands Industrial Development Park (IDP) and adjacent facilities in St. Croix, Virgin Islands. The Economic Development Authority sought assistance from the U.S. Department of Energy to undertake this assessment undertaken by Pacific Northwest National Laboratory. The assessment included 18 buildings plus the perimeter security lighting at the Virgin Islands Bureau of Correctional Facility, four buildings plus exterior lighting at the IDP, and five buildings (one of whichmore » is to be constructed) at the Virgin Islands Police Department for a total of 27 buildings with a total of nearly 323,000 square feet.« less

  9. 5. VIEW LOOKING SOUTH DOWN SIXTH STREET AT THE INTERSECTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW LOOKING SOUTH DOWN SIXTH STREET AT THE INTERSECTION WITH CENTRAL AVENUE. AS PART OF THE INITIAL SITE DEVELOPMENT, A RAILROAD SPUR, ACCESS ROADS, POWER LINES, AND TELEPHONE LINES WERE BUILT. ALL FACILITIES WERE HEATED BY STEAM GENERATED IN BUILDING 443 AND PIPED THROUGHOUT THE SITE. THE BUILDING IN THE BACKGROUND OF THE PHOTOGRAPH IS BUILDING 664, A LOW - LEVEL WASTE STORAGE FACILITY. - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO

  10. 40. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHANGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHANGE FILLING PLANT), DETAIL SOUTHEAST SIDE OF EXTERIOR ELECTRICAL EQUIPMENT ROOM, SHOWING DOOR TO SEWING ROOM NO. 3, VENTILATOR FAN (OVER DOOR), STEAM LINE (PIPE), SEWING MACHINE MOTOR IN OVERHEAD, ALARM BELL, EXPLOSION-PROOF SWITCH BOXES, GROUNDS ON DOORS, PULL ALARM HANDLE (EXTREME RIGHT; PULLEY CABLE CONDUCTED IN CONDUIT TO SWITCH INSIDE BUILDING. PULLEYS INSIDE ALL ELBOW JOINTS.) - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  11. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  12. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  13. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  14. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  15. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  16. KSC-2011-1060

    NASA Image and Video Library

    2011-01-07

    CAPE CANAVERAL, Fla. -- Finishing touches adorn the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. Artwork for the facility was produced by Greg Lee, a graphics specialist with Abacus Technology Corp., with input from the facility's future occupants. The environmentally friendly facility is slated to be NASA's second Platinum-rated by the U.S. Green Building Council's (USGBC) Leadership in Environmental and Energy Design (LEED) certification system. It will be the space agency's first net-zero facility, which means it will produce enough energy onsite from renewable sources to offset what it requires to operate. The facility consists of a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy, and a single-story shop to store cryogenic fuel transfer equipment. Photo credit: NASA/Frankie Martin

  17. Indoor Athletic Facilities.

    ERIC Educational Resources Information Center

    Fleming, E. Scott

    2000-01-01

    Examines the concept of shared-use facilities to help financially support and meet the demand for athletic facilities. Shared-use considerations are explored including cost sharing of ongoing operations, aesthetics, locker rooms, support facilities, parking and site access, and building access and security. (GR)

  18. VIEW LOOKING SOUTHWEST AT BUILDING 122 DURING CONSTRUCTION. BUILDING 122, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING SOUTHWEST AT BUILDING 122 DURING CONSTRUCTION. BUILDING 122, THE EMERGENCY MEDICAL BUILDING, WAS ONE OF THE ORIGINAL STRUCTURES AT THE ROCKY FLATS PLANT. (5/29/52) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  19. 34. SITE BUILDING 002 SCANNER BUILDING ROOM 105 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. SITE BUILDING 002 - SCANNER BUILDING - ROOM 105 - CHILLER ROOM, SHOWING SINGLE COMPRESSOR, LIQUID CHILLERS AND "CHILLED WATER RETURN", COOLING TOWER 'TOWER WATER RETURN" AND 'TOWER WATER SUPPLY" LINES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  20. 25. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1930 ZULU TIME, 26 OCTOBER, 1999. MWOC SCREEN ALSO SHOWS RADAR "FACE A" AND "FACE B" ACTIVE STATUS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  1. The Building Commissioning Handbook.

    ERIC Educational Resources Information Center

    Heinz, John A.; Casault, Rick

    This book discusses building commissioning, which is the process of certifying that a new facility meets the required specifications. As buildings have become more complex, the traditional methods for building start-up and final acceptance have been proven inadequate, and building commissioning has been developed, which often necessitates the use…

  2. 29. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) AT SYSTEM LAYOUT GRID 17. GENERAL OBLIQUE VIEW OF "A" FACE INTERIOR SHOWING RADAR EMITTER/ANTENNA INTERFACE ELECTRONICS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. 10. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT SOUTHWEST CORNER "B" FACE AND "C" FACE ON WEST AND EVAPORATIVE COOLING TOWER AT NORTH. VIEW IS LOOKING NORTH 45° EAST. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  4. 19. SITE BUILDING 002 SCANNER BUILDING AIR POLICE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. SITE BUILDING 002 - SCANNER BUILDING - AIR POLICE SITE SECURITY OFFICE WITH "SITE PERIMETER STATUS PANEL" AND REAL TIME VIDEO DISPLAY OUTPUT FROM VIDEO CAMERA SYSTEM AT SECURITY FENCE LOCATIONS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rockhold, Mark L.; White, Mark D.; Freeman, Eugene J.

    This letter report documents initial numerical analyses conducted by PNNL to provide support for a feasibility study on decommissioning of the canyon buildings at Hanford. The 221-U facility is the first of the major canyon buildings to be decommissioned. The specific objective of this modeling effort was to provide estimates of potential rates of migration of residual contaminants out of the 221-U facility during the first 40 years after decommissioning. If minimal contaminant migration is predicted to occur from the facility during this time period, then the structure may be deemed to provide a level of groundwater protection that ismore » essentially equivalent to the liner and leachate collection systems that are required at conventional landfills. The STOMP code was used to simulate transport of selected radionuclides out of a canyon building, representative of the 221-U facility after decommissioning, for a period of 40 years. Simulation results indicate that none of the selected radionuclides that were modeled migrated beyond the concrete structure of the facility during the 40-year period of interest. Jacques (2001) identified other potential contaminants in the 221-U facility that were not modeled, however, including kerosene, phenol, and various metals. Modeling of these contaminants was beyond the scope of this preliminary effort due to increased complexity. Simulation results indicate that contaminant release from the canyon buildings will be diffusion controlled at early times. Advection is expected to become much more important at later times, after contaminants have diffused out of the facility and into the surrounding soil environment. After contaminants have diffused out of the facility, surface infiltration covers will become very important for mitigating further transport of contaminants in the underlying vadose zone and groundwater.« less

  6. EMS Activations for School-Aged Children From Public Buildings, Places of Recreation or Sport, and Health Care Facilities in Pennsylvania.

    PubMed

    Catherine, Andrew T; Olympia, Robert P

    2016-06-01

    To determine the etiology of emergency medical services (EMS) activations in 2011 to public buildings, places of recreation or sport, and health care facilities involving children aged 5 to 18 years in Pennsylvania. Electronic records documenting 2011 EMS activations as provided by the Pennsylvania Department of Health's Bureau of EMS were reviewed. Data elements (demographics, dispatch complaint, mechanism of injury, primary assessment) from patients aged 5 to 18 years involved in an EMS response call originating from either a public building, a place of recreation and sport, or health care facility were analyzed. A total of 12,289 records were available for analysis. The most common primary assessments from public buildings were traumatic injury, behavioral/psychiatric disorder, syncope/fainting, seizure, and poisoning. The most common primary assessments from places of recreation or sport were traumatic injury, syncope/fainting, altered level of consciousness, respiratory distress, and abdominal pain. The most common primary assessments from health care facilities were behavioral/psychiatric disorder, traumatic injury, abdominal pain, respiratory distress, and syncope/fainting. When examining the mechanism of injury for trauma-related primary assessments, falls were the most common mechanism at all 3 locations, followed by being struck by an object. Of the 1335 serious-incident calls (11% of the total EMS activations meeting inclusion criteria), 61.2% were from public buildings, 14.1% from places of recreation or sport, and 24.7% from health care facilities. Our identification of common EMS dispatch complaints, mechanisms of injury, and primary assessments can be used in the education of staff and preparation of facilities for medical emergencies and injuries where children spend time.

  7. 4. CONTROL BUILDING B, VIEW TOWARDS SOUTHEAST. Glenn L. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. CONTROL BUILDING B, VIEW TOWARDS SOUTHEAST. - Glenn L. Martin Company, Titan Missile Test Facilities, Control Building B, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  8. Yahoo! Compute Coop (YCC). A Next-Generation Passive Cooling Design for Data Centers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robison, AD; Page, Christina; Lytle, Bob

    The purpose of the Yahoo! Compute Coop (YCC) project is to research, design, build and implement a greenfield "efficient data factory" and to specifically demonstrate that the YCC concept is feasible for large facilities housing tens of thousands of heat-producing computing servers. The project scope for the Yahoo! Compute Coop technology includes: - Analyzing and implementing ways in which to drastically decrease energy consumption and waste output. - Analyzing the laws of thermodynamics and implementing naturally occurring environmental effects in order to maximize the "free-cooling" for large data center facilities. "Free cooling" is the direct usage of outside air tomore » cool the servers vs. traditional "mechanical cooling" which is supplied by chillers or other Dx units. - Redesigning and simplifying building materials and methods. - Shortening and simplifying build-to-operate schedules while at the same time reducing initial build and operating costs. Selected for its favorable climate, the greenfield project site is located in Lockport, NY. Construction on the 9.0 MW critical load data center facility began in May 2009, with the fully operational facility deployed in September 2010. The relatively low initial build cost, compatibility with current server and network models, and the efficient use of power and water are all key features that make it a highly compatible and globally implementable design innovation for the data center industry. Yahoo! Compute Coop technology is designed to achieve 99.98% uptime availability. This integrated building design allows for free cooling 99% of the year via the building's unique shape and orientation, as well as server physical configuration.« less

  9. Myofibrosarcoma treated with Mohs micrographic surgery.

    PubMed

    Chiller, Katarina; Parker, Douglas; Washington, Carl

    2004-12-01

    Myofibrosarcoma is a rare malignant mesenchymal tumor composed predominantly of differentiated myofibroblasts. These tumors occur in both children and adults alike and are most commonly located on the head and neck. Recurrences rates range from 44% to 75%, and metastatic disease has been reported in up to 44% of cases. The objective was to present a case of a myofibrosarcoma treated with Mohs micrographic surgery and discuss the use of ultrastructural evaluation in the diagnosis of this rare tumor. A 31-year-old African American woman who presented to the Emory University Dermatologic Surgery Clinic with a 4-month history of a 2.5 x 2.5-cm indurated firm painful right upper lateral thigh nodule. A prior biopsy revealed a proliferation of somewhat bland spindled cells with large zones of necrosis with prominent mitotic figures, changes compatible with a cellular dermatofibroma. Because the lesion exhibited clinically suspicious characteristics such as rapid growth and deep infiltration, the patient was subsequently referred to Emory for further evaluation. There was no evidence of lymphadenopathy and a chest X-ray was unremarkable. A two-staged (five and four sections, respectively) uneventful Mohs micrographic surgery procedure was performed resulting in a defect measuring 3.5 x 3.5 x 1.0 cm. Primary closure was achieved with no complication, and the final scar measured 10 cm. Because of the suspicious clinical behavior of this tumor debulking specimen was sent for permanent section. Histopathologic interpretation of these sections was consistent with a fibrosarcoma with myofibroblastic differentiation. No clinical recurrence noted after 14-month follow-up. Mohs micrographic surgery is a technique that has been shown to provide superior cure rates in the treatment of many mesenchymal tumors. Here, we report the first case of myofibrosarcoma treated with Mohs micrographic surgery. Myofibrosarcoma is a rare but aggressive tumor that can be difficult to distinguish from other somewhat less aggressive malignancies such as dermatofibrosarcoma protuberans or malignant fibrous histiocytoma. Specific histopathologic criteria are reviewed. We recommend including Mohs micrographic surgery in the armamentarium for the treatment of this rare tumor.

  10. 9 CFR 354.220 - Buildings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Buildings. 354.220 Section 354.220... CERTIFICATION VOLUNTARY INSPECTION OF RABBITS AND EDIBLE PRODUCTS THEREOF Buildings and Plant Facilities § 354.220 Buildings. The buildings shall be of sound construction and kept in good repair, and shall be of...

  11. 1. Context view of Building 205, showing hydrogen tanks in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Context view of Building 205, showing hydrogen tanks in foreground and Building 202 exhaust scrubber stack in background. View looking southwest from top of mound east of Building 205. - Rocket Engine Testing Facility, GRC Building No. 205, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  12. 20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. 55. Photocopy of Structural drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-15 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - UTILITY BUILDING. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  14. 23. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), INTERIOR, LOOKING SOUTH DOWN CENTRAL CORRIDOR. NOTE BINS IN WALLS ON EITHER SIDE OF CORRIDOR, USED FOR PASSING EXPLOSIVES AND LOADED ITEMS TO SIEVING ROOMS BEYOND WALLS. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  15. AMERICAN STANDARD SPECIFICATIONS FOR MAKING BUILDINGS AND FACILITIES ACCESSIBLE TO, AND USABLE BY, THE PHYSICALLY HANDICAPPED.

    ERIC Educational Resources Information Center

    National Easter Seal Society for Crippled Children and Adults, Chicago, IL.

    THIS STANDARD IS INTENDED TO PROVIDE MINIMUM REQUIREMENTS TO BE USED IN THE CONSTRUCTION OF ALL BUILDINGS AND FACILITIES AND FOR ADOPTION AND ENFORCEMENT BY ADMINISTRATIVE AUTHORITIES IN ORDER TO ALLOW INDIVIDUALS WITH PERMANENT PHYSICAL DISABILITIES TO PURSUE THEIR INTERESTS AND ASPIRATIONS, DEVELOP THEIR TALENTS, AND EXERCISE THEIR SKILLS.…

  16. To Build or Not to Build: Addressing Facilities Needs While Controlling Costs

    ERIC Educational Resources Information Center

    Kadamus, James A.

    2015-01-01

    When trustees, presidents, and senior college administrators meet, one topic dominates the conversation: how to keep education quality high and costs down. To keep quality high, college leaders need to have strong faculties and state-of-the-art facilities for teaching and research. Quality counts but it also costs, and that is where the pressures…

  17. Making the Case for Facility Modernization, Renovation, and Repairs

    ERIC Educational Resources Information Center

    Kwok, Michael

    2009-01-01

    Like homeowners with limited budgets and a long list of repairs, school districts often must make tough choices when it comes to deciding what building systems to modernize, renovate, or repair--or when to build new facilities. With $44 billion now available for states and schools under the American Recovery and Reinvestment Act of 2009, stimulus…

  18. 36 CFR § 1281.16 - What standard does NARA use for measuring building size?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true What standard does NARA use for measuring building size? § 1281.16 Section § 1281.16 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NARA FACILITIES PRESIDENTIAL LIBRARY FACILITIES § 1281.16 What...

  19. 76 FR 30884 - Special Local Regulation; Kelley's Island Swim, Lake Erie; Kelley's Island, Lakeside, OH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ...) Mail: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor... ``Search'' then click on the balloon shape in the ``Actions'' column. If you submit your comments by mail... Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New...

  20. 48 CFR 215.404-71-4 - Facilities capital employed.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and equipment, as derived in DD Form 1861, Contract Facilities Capital Cost of Money. (i) In addition... facilities capital, the allocated facilities capital attributable to the buildings and equipment of those... Equipment 17.5 10 to 25 (g) Evaluation criteria. (1) In evaluating facilities capital employed, the...

  1. KSC-2011-1152

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, James Wright, the deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  2. KSC-05pd2349

    NASA Image and Video Library

    2005-10-25

    KENNEDY SPACE CENTER, FLA. - A piece of metal lies on the ground near the NASA Kennedy Space Center’s Vehicle Assembly Building following the wrath of hurricane Wilma as it crossed the state Oct. 24. Kennedy’s facilities sustained minor structural damage, primarily to roofs or from water intrusion. The Vehicle Assembly Building lost some panels on the east and west sides. Some facilities lost power. A total of 13.6 inches of rain was recorded at the Shuttle Landing Facility. The highest wind gust recorded was 94 mph from the north-northwest at Launch Pad 39B, while the maximum sustained wind was 76 mph from the north-northwest at the top of the 492-foot weather tower located north of the Vehicle Assembly Building.

  3. KSC-05pd2352

    NASA Image and Video Library

    2005-10-25

    KENNEDY SPACE CENTER, FLA. - Pieces of metal lie alongside a fence near NASA Kennedy Space Center’s Vehicle Assembly Building following the wrath of hurricane Wilma as it crossed the state Oct. 24. Kennedy’s facilities sustained minor structural damage, primarily to roofs or from water intrusion. The Vehicle Assembly Building lost some panels on the east and west sides. Some facilities lost power. A total of 13.6 inches of rain was recorded at the Shuttle Landing Facility. The highest wind gust recorded was 94 mph from the north-northwest at Launch Pad 39B, while the maximum sustained wind was 76 mph from the north-northwest at the top of the 492-foot weather tower located north of the Vehicle Assembly Building.

  4. Communications and Tracking Development Laboratory/Building 44. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas, prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Communications and Tracking Development Laboratory (Building 44) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 44 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle Program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 44 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented by 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle Program; the history of JSC in relation to the SSP; a narrative of the history of Building 44 and how it supported the SSP; and a physical description of the building. In addition, photographs documenting the construction and historical use of Building 44 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are also provided.

  5. Trending Technologies for Indoor FM: Looking for "Geo" in Information

    NASA Astrophysics Data System (ADS)

    Gunduz, M.; Isikdag, U.; Basaraner, M.

    2016-10-01

    Today technological developments in the Architecture Engineering and Construction (AEC) industry provides opportunities to build huge and complex buildings and facilities. In order to operate these facilities and to meet the requirements of the occupants and also to manage energy, waste and to keep all facility services operational, several Facility Management (FM) solutions were developed. This paper starts by presenting a state of art review of research related to Indoor Facility Management Systems. Later, a textual analysis focused to identify the research trends in this field is presented in the paper. The result of the literature review and textual analysis indicates that current research in Indoor FM Systems is underestimating the role of Geoinformation, Geoinformation models and systems.

  6. Main Building (4800) at Dryden FRC

    NASA Image and Video Library

    1991-09-05

    The X-1E research aircraft provides a striking view at the entrance of NASA's Dryden Flight Research Center, Edwards, California. The X-1E, one of the three original X-1 aircraft modified with a raised cockpit canopy and an ejection seat, was flown at the facility between 1953 and 1958 to investigate speeds at twice that of sound, and also to evaluate a thin wing designed for high-speed flight. The Dryden complex was originally established in 1946 as a small high-speed flight station to support the X-1 program. The X-1 was the first aircraft to fly at supersonic speeds. The main administrative building is to the rear of the X-1E and is the center of a research installation that has grown to more than 450 government employees and nearly 400 civilian contractors. Located on the northwest "shore" of Rogers Dry Lake, the Dryden Center was built around the original administrative-hangar building constructed in 1954 at a cost of $3.8 million. Since then many additional support and operational facilities have been built including a number of unique test facilities such as the Thermalstructures Research Facility, Flow Visualization Facility, and the newest addition, the Integrated Test Facility.

  7. This image, looking due north, demonstrates the south side of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This image, looking due north, demonstrates the south side of the building - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  8. 3-D shape estimation of DNA molecules from stereo cryo-electron micro-graphs using a projection-steerable snake.

    PubMed

    Jacob, Mathews; Blu, Thierry; Vaillant, Cedric; Maddocks, John H; Unser, Michael

    2006-01-01

    We introduce a three-dimensional (3-D) parametric active contour algorithm for the shape estimation of DNA molecules from stereo cryo-electron micrographs. We estimate the shape by matching the projections of a 3-D global shape model with the micrographs; we choose the global model as a 3-D filament with a B-spline skeleton and a specified radial profile. The active contour algorithm iteratively updates the B-spline coefficients, which requires us to evaluate the projections and match them with the micrographs at every iteration. Since the evaluation of the projections of the global model is computationally expensive, we propose a fast algorithm based on locally approximating it by elongated blob-like templates. We introduce the concept of projection-steerability and derive a projection-steerable elongated template. Since the two-dimensional projections of such a blob at any 3-D orientation can be expressed as a linear combination of a few basis functions, matching the projections of such a 3-D template involves evaluating a weighted sum of inner products between the basis functions and the micrographs. The weights are simple functions of the 3-D orientation and the inner-products are evaluated efficiently by separable filtering. We choose an internal energy term that penalizes the average curvature magnitude. Since the exact length of the DNA molecule is known a priori, we introduce a constraint energy term that forces the curve to have this specified length. The sum of these energies along with the image energy derived from the matching process is minimized using the conjugate gradients algorithm. We validate the algorithm using real, as well as simulated, data and show that it performs well.

  9. Facility and Laboratory Equipment | Energy Systems Integration Facility |

    Science.gov Websites

    Energy Systems Integration Facility is its infrastructure. In addition to extensive fixed laboratory . Photo of researchers testing building loads and power networks in the Systems Performance Laboratory

  10. 10 CFR 436.11 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... significantly the cost of energy consumed. Building water system means a water conservation measure or any... building means an energy or water conservation measure or any building, structure, or facility, or part... water conservation measure, or any component thereof. Retrofit means installation of a building energy...

  11. 10 CFR 436.11 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... significantly the cost of energy consumed. Building water system means a water conservation measure or any... building means an energy or water conservation measure or any building, structure, or facility, or part... water conservation measure, or any component thereof. Retrofit means installation of a building energy...

  12. 10 CFR 436.11 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... significantly the cost of energy consumed. Building water system means a water conservation measure or any... building means an energy or water conservation measure or any building, structure, or facility, or part... water conservation measure, or any component thereof. Retrofit means installation of a building energy...

  13. Building a Better Learning Environment.

    ERIC Educational Resources Information Center

    Dentch, Matthew

    2000-01-01

    Explains how an environmentally friendly (Green Building) educational facility can be cost effective and enhance student performance. The concepts behind a Green Building, the areas where cost savings are possible, and some examples of realized cost savings are highlighted. Green Building funding issues are discussed. (GR)

  14. One wall of the original E Building is visible in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    One wall of the original E Building is visible in the back of this image, looking west in Room 142, a typical laboratory space - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  15. Wake Shield Facility Modal Survey Test in Vibration Acoustic Test Facility

    NASA Image and Video Library

    1991-10-09

    Astronaut Ronald M. Sega stands beside the University of Houston's Wake Shield Facility before it undergoes a Modal Survey Test in the Vibration and Acoustic Test Facility Building 49, prior to being flown on space shuttle mission STS-60.

  16. 13. Building 202 exhaust scrubber water detention tank, looking southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Building 202 exhaust scrubber water detention tank, looking southeast from bed of Abram Creek. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. 3. Southeast corner of Building 202, looking northwest from steps ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Southeast corner of Building 202, looking northwest from steps on hillside near water tank. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  18. 6. VIEW SOUTH TOWARD SOUTHERN PORTION OF BUILDING 1. GARAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW SOUTH TOWARD SOUTHERN PORTION OF BUILDING 1. GARAGE ADDITION AT LEFT. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA

  19. 9. LOOKING NORTHWEST TOWARD SOUTHERN SIDES OF BUILDING 1. GARAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. LOOKING NORTHWEST TOWARD SOUTHERN SIDES OF BUILDING 1. GARAGE ADDITION AT RIGHT. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA

  20. Looking southeast, this photograph shows the length of the north ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking southeast, this photograph shows the length of the north elevation of E Building - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  1. SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE FIRE TEAM FACILITY (BUILDING 3001) (CENTER). VIEW TO SOUTHEAST. - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY

  2. 37. INTERIOR VIEW TO THE SOUTHEAST OF FACILITIES IN ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. INTERIOR VIEW TO THE SOUTHEAST OF FACILITIES IN ROOM 112, THE RESTROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  3. 14. FACILITY IDENTIFICATION STENCILED ON ROOF BEAM, 'RIGGING LOFT' PORTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. FACILITY IDENTIFICATION STENCILED ON ROOF BEAM, 'RIGGING LOFT' PORTION OF BUILDING 4. - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA

  4. KSC-2011-1154

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  5. KSC-2011-1155

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  6. Options to improve energy efficiency for educational building

    NASA Astrophysics Data System (ADS)

    Jahan, Mafruha

    The cost of energy is a major factor that must be considered for educational facility budget planning purpose. The analysis of energy related issues and options can be complex and requires significant time and detailed effort. One way to facilitate the inclusion of energy option planning in facility planning efforts is to utilize a tool that allows for quick appraisal of the facility energy profile. Once such an appraisal is accomplished, it is then possible to rank energy improvement options consistently with other facility needs and requirements. After an energy efficiency option has been determined to have meaningful value in comparison with other facility planning options, it is then possible to utilize the initial appraisal as the basis for an expanded consideration of additional facility and energy use detail using the same analytic system used for the initial appraisal. This thesis has developed a methodology and an associated analytic model to assist in these tasks and thereby improve the energy efficiency of educational facilities. A detailed energy efficiency and analysis tool is described that utilizes specific university building characteristics such as size, architecture, envelop, lighting, occupancy, thermal design which allows reducing the annual energy consumption. Improving the energy efficiency of various aspects of an educational building's energy performance can be complex and can require significant time and experience to make decisions. The approach developed in this thesis initially assesses the energy design for a university building. This initial appraisal is intended to assist administrators in assessing the potential value of energy efficiency options for their particular facility. Subsequently this scoping design can then be extended as another stage of the model by local facility or planning personnel to add more details and engineering aspects to the initial screening model. This approach can assist university planning efforts to identify the most cost effective combinations of energy efficiency strategies. The model analyzes and compares the payback periods of all proposed Energy Performance Measures (EPMs) to determine which has the greatest potential value.

  7. Applications for Micrographics in Large Scale Information Systems of the Future. Volume I: Part I. Summary. Part II. Five-Year Plan for DDC Micrographic Development Actions.

    ERIC Educational Resources Information Center

    Information Dynamics Corp., Reading, MA.

    A study intended to provide the Defense Documentation Center (DDC) with a five-year plan for the development of improved and new microfiche products, services, and production capabilities is summarized in this report. In addition, the major findings, conclusions, and recommendations developed during the study are noted. The results of the research…

  8. Cloud condensation nucleus counter by impactor sampling technique

    NASA Technical Reports Server (NTRS)

    Ohtake, T.

    1981-01-01

    Unlike typical CCN counters, this device counts the numbers of water droplets condensed on aerosol particles sampled on a microcover glass at various different relative humidities. The relative humidities ranged from 75 percent to a calculated value of 110 percent. A schematic of the apparatus is shown. The individual CCN can be identified in an optical micrograph and scanning electron micrograph and may be inspected for their chemical composition later.

  9. Application of fractal and grey level co-occurrence matrix analysis in evaluation of brain corpus callosum and cingulum architecture.

    PubMed

    Pantic, Igor; Dacic, Sanja; Brkic, Predrag; Lavrnja, Irena; Pantic, Senka; Jovanovic, Tomislav; Pekovic, Sanja

    2014-10-01

    This aim of this study was to assess the discriminatory value of fractal and grey level co-occurrence matrix (GLCM) analysis methods in standard microscopy analysis of two histologically similar brain white mass regions that have different nerve fiber orientation. A total of 160 digital micrographs of thionine-stained rat brain white mass were acquired using a Pro-MicroScan DEM-200 instrument. Eighty micrographs from the anterior corpus callosum and eighty from the anterior cingulum areas of the brain were analyzed. The micrographs were evaluated using the National Institutes of Health ImageJ software and its plugins. For each micrograph, seven parameters were calculated: angular second moment, inverse difference moment, GLCM contrast, GLCM correlation, GLCM variance, fractal dimension, and lacunarity. Using the Receiver operating characteristic analysis, the highest discriminatory value was determined for inverse difference moment (IDM) (area under the receiver operating characteristic (ROC) curve equaled 0.925, and for the criterion IDM≤0.610 the sensitivity and specificity were 82.5 and 87.5%, respectively). Most of the other parameters also showed good sensitivity and specificity. The results indicate that GLCM and fractal analysis methods, when applied together in brain histology analysis, are highly capable of discriminating white mass structures that have different axonal orientation.

  10. 26. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1945 ZULU TIME, 26 OCTOBER, 1999. "SPACE TRACK BOARD" DATA SHOWING ITEMS #16609 MIR (RUSSIA) AND #25544 ISS (INTERNATIONAL SPACE STATION) BEING TRACKED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  11. 21. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT DISC STORAGE SYSTEMS A AND B (A OR B ARE REDUNDANT SYSTEMS), ONE MAINFRAME COMPUTER ON LINE, ONE ON STANDBY WITH STORAGE TAPE, ONE ON STANDBY WITHOUT TAPE INSTALLED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  12. 1. VIEW LOOKING NORTHWEST AT BUILDING 444 UNDER CONSTRUCTION. ORIGINALLY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW LOOKING NORTHWEST AT BUILDING 444 UNDER CONSTRUCTION. ORIGINALLY CALLED PLANT A, BUILDING 444 WAS ONE OF THE FIRST BUILDINGS CONSTRUCTED AT THE ROCKY FLATS PLANT. (4/15/52) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  13. SUNREL Applications | Buildings | NREL

    Science.gov Websites

    used by the building design team for energy analysis. Zion National Park Visitor's Center Grand Canyon National Park Bookstore NREL Thermal Test Facility NREL Wind Site Entrance Building DPD Office Building Performance Analysis of a High-Mass Residential Building Van Geet residence The Van Geet Off-Grid Home: An

  14. This photograph, taken from the main roof of E Building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photograph, taken from the main roof of E Building, looking north, shows two metal penthouses at right, a similar brick structure and some of the vents and other mechanical devices of the building - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  15. A compilation of chase work characterizes this image, looking south, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A compilation of chase work characterizes this image, looking south, in the niche which slightly separates E Building form R Building, on the north side - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  16. Energy 101: Energy Efficient Commercial Buildings

    ScienceCinema

    None

    2018-06-06

    Learn how commercial buildings can incorporate whole-building design to save energy and money while enhancing performance and comfort. This video highlights several energy-saving features of the Research Support Facility at the Energy Department's National Renewable Energy Laboratory-a model for high-performance office building design.

  17. View looking southeast from the roof of OSW Building, toward ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking southeast from the roof of OSW Building, toward E Building (center ground of image). Part of H Building is in the immediate foreground. This photograph shows the relationship between E Building and others adjacent to it as well as some of the panorama of the site - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  18. New NREL Research Facility Slashes Energy Use by 66 Percent

    Science.gov Websites

    Thermal Test Facility, which serves as a showcase of energy-saving features and the home of NREL's cutting technologies now being developed at the Thermal Test Facility will help us reach this goal." The facility energy-efficient building design, NREL's Thermal Test Facility houses sophisticated equipment for

  19. 38 CFR 1.301 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., including any necessary buildings and structures, garage or parking facility. (e) Parking facilities... whom the Secretary is authorized to furnish medical examination or treatment. (c) Garage means a structure or part of a structure in which vehicles may be parked. (d) Medical facility means any facility or...

  20. 38 CFR 1.301 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., including any necessary buildings and structures, garage or parking facility. (e) Parking facilities... whom the Secretary is authorized to furnish medical examination or treatment. (c) Garage means a structure or part of a structure in which vehicles may be parked. (d) Medical facility means any facility or...

  1. 38 CFR 1.301 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., including any necessary buildings and structures, garage or parking facility. (e) Parking facilities... whom the Secretary is authorized to furnish medical examination or treatment. (c) Garage means a structure or part of a structure in which vehicles may be parked. (d) Medical facility means any facility or...

  2. 38 CFR 1.301 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., including any necessary buildings and structures, garage or parking facility. (e) Parking facilities... whom the Secretary is authorized to furnish medical examination or treatment. (c) Garage means a structure or part of a structure in which vehicles may be parked. (d) Medical facility means any facility or...

  3. 38 CFR 1.301 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., including any necessary buildings and structures, garage or parking facility. (e) Parking facilities... whom the Secretary is authorized to furnish medical examination or treatment. (c) Garage means a structure or part of a structure in which vehicles may be parked. (d) Medical facility means any facility or...

  4. Facilities | Hydrogen and Fuel Cells | NREL

    Science.gov Websites

    integration research. Photo of the Hydrogen Infrastructure Testing and Research Facility building, with hydrogen fueling station and fuel cell vehicles. Hydrogen Infrastructure Testing and Research Facility The Hydrogen Infrastructure Testing and Research Facility (HITRF) at the ESIF combines electrolyzers, a

  5. Florida Educational Facilities, 1996.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1996. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  6. Florida Educational Facilities, 1997.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1997. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  7. Florida Educational Facilities, 1998.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1998. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  8. 41. Photocopy of progress photograph ca. 1974, photographer unknown. Original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photocopy of progress photograph ca. 1974, photographer unknown. Original photograph Property of United States Air Force, 21" Space Command. This is the source for views 41 to 47. CAPE COD AIR STATION PAVE PAWS FACILITY - SHOWING BUILDING "RED IRON" STEEL STRUCTURE NEARING COMPLETION. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  9. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south end of EBOR helium wing. Camera facing north. Monorail protrudes from upper-level door. Rust marks on concrete wall are from stack. Metal shed is post-1970 addition. INEEL negative no. HD-40-8-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  10. School Facilities Report: The Results of a Statewide Survey To Determine the Physical Condition and Capacity of Wisconsin's Public Schools.

    ERIC Educational Resources Information Center

    Soldner, Bob

    This report documents survey results in three areas concerning Wisconsin public schools: data on the physical structure and mechanical features of the school building; data on school safety issues; and information on the educational appropriateness and suitability of the school buildings. Appendices provide the school facility survey; and lists of…

  11. 117. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    117. Back side technical facilities S.R. radar transmitter & computer building no. 102, "building sections - sheet I" - architectural, AS-BLT AW 35-46-04, sheet 12, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  12. 118. Back side technical facilities S.R. radar transmitter & computer ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    118. Back side technical facilities S.R. radar transmitter & computer building no. 102, "building sections - sheet I" - architectural, AS-BLT AW 35-46-04, sheet 13, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  13. How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money. Energy-Smart Building Choices.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC.

    This guide addresses contributions that school facility administrators and business officials can make in an effort to reduce operating costs and free up money for capital improvements. The guide explores opportunities available to utilize energy-saving strategies at any stage in a building's life, from its initial design phase through renovation.…

  14. 36 CFR 1280.82 - How will NARA handle my request to use public areas in the National Archives Building?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false How will NARA handle my request to use public areas in the National Archives Building? 1280.82 Section 1280.82 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NARA FACILITIES USE OF NARA FACILITIES What...

  15. 36 CFR 1280.76 - When are the public areas available for private events in the National Archives Building?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false When are the public areas available for private events in the National Archives Building? 1280.76 Section 1280.76 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NARA FACILITIES USE OF NARA FACILITIES What...

  16. 36 CFR 1280.76 - When are the public areas available for private events in the National Archives Building?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false When are the public areas available for private events in the National Archives Building? 1280.76 Section 1280.76 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NARA FACILITIES USE OF NARA FACILITIES What...

  17. 36 CFR 1280.82 - How will NARA handle my request to use public areas in the National Archives Building?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false How will NARA handle my request to use public areas in the National Archives Building? 1280.82 Section 1280.82 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION NARA FACILITIES USE OF NARA FACILITIES What...

  18. Removal design report for the 108-F Biological Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    Most of the 100-F facilities were deactivated with the reactor and have since been demolished. Of the dozen or so reactor-related structures, only the 105-F Reactor Building and the 108-F Biology Laboratory remain standing today. The 108-F Biology Laboratory was intended to be used as a facility for the mixing and addition of chemicals used in the treatment of the reactor cooling water. Shortly after F Reactor began operation, it was determined that the facility was not needed for this purpose. In 1949, the building was converted for use as a biological laboratory. In 1962, the lab was expanded bymore » adding a three-story annex to the original four-story structure. The resulting lab had a floor area of approximately 2,883 m{sup 2} (main building and annex) that operated until 1973. The building contained 47 laboratories, a number of small offices, a conference room, administrative section, lunch and locker rooms, and a heavily shielded, high-energy exposure cell. The purpose of this removal design report is to establish the methods of decontamination and decommissioning and the supporting functions associated with facility removal and disposal.« less

  19. Geothermal-retrofit study for the National Orange Show Facilities in San Bernardino, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-11-17

    The cost and feasibility of retrofitting the National Orange Show Facilities to use geothermal heat instead of natural gas for heating are determined. Because of the limited usage of the smaller facilities the study was limited to the conversion of the six major buildings: Domed, Hobby, Citrus, Auditorium, Restaurant and Commercial. A major problem is that most of the buildings are used on a very limited basis. This drastically reduced the amount of savings that could be used to amortize the retrofit cost. Another problem is that the buildings are spread over a large area and so the below grademore » piping costs were high. Finally, all of the buildings except for the Auditorium have direct gas fired heaters that would require all new terminal heating systems. In order to limit the retrofit cost, the retrofit system was designed to handle less than the peak load. This seemed appropriate because the facility might not even be in operation when a peak load condition occurred. Also, the existing systems could be used to supplement the geothermal system if necessary. The calculated and design peak loads are summarized.« less

  20. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  1. Building Blueprints: Making Music.

    ERIC Educational Resources Information Center

    College Planning & Management, 2002

    2002-01-01

    Depicts how Cornell University renovated its civil engineering and architecture building to include space for musical performances, teaching, and rehearsals. The article highlights the facility's contemporary design, which also compliments the form and massing of the original building. (GR)

  2. 39 CFR 776.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UNITED STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES General... buildings, structures and improvements. Contending site means a site or existing building for a proposed... operations organization. Facility means any building, appurtenant structures, or associated infrastructure...

  3. View of North End of Oxide Building Interior Including Roof ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of North End of Oxide Building Interior Including Roof and Wall Juncture and Crane Trolley - Hematite Fuel Fabrication Facility, Oxide Building & Oxide Loading Dock, 3300 State Road P, Festus, Jefferson County, MO

  4. 16. View of Building 100 control room. 1987. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. View of Building 100 control room. 1987. On file at NASA Glenn Research Center, Cleveland, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  5. 20. Building 202, detail of stand A, rocket test stand ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Building 202, detail of stand A, rocket test stand in test cell. View looking southeast. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  6. OPEN AIR DEMOLITION OF FACILITIES HIGHLY CONTAMINATED WITH PLUTONIUM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LLOYD, E.R.

    2007-05-31

    The demolition of highly contaminated plutonium buildings usually is a long and expensive process that involves decontaminating the building to near free- release standards and then using conventional methods to remove the structure. It doesn't, however, have to be that way. Fluor has torn down buildings highly contaminated with plutonium without excessive decontamination. By removing the select source term and fixing the remaining contamination on the walls, ceilings, floors, and equipment surfaces; open-air demolition is not only feasible, but it can be done cheaper, better (safer), and faster. Open-air demolition techniques were used to demolish two highly contaminated buildings tomore » slab-on-grade. These facilities on the Department of Energy's Hanford Site were located in, or very near, compounds of operating nuclear facilities that housed hundreds of people working on a daily basis. To keep the facilities operating and the personnel safe, the projects had to be creative in demolishing the structures. Several key techniques were used to control contamination and keep it within the confines of the demolition area: spraying fixatives before demolition; applying fixative and misting with a fine spray of water as the buildings were being taken down; and demolishing the buildings in a controlled and methodical manner. In addition, detailed air-dispersion modeling was done to establish necessary building and meteorological conditions and to confirm the adequacy of the proposed methods. Both demolition projects were accomplished without any spread of contamination outside the modest buffer areas established for contamination control. Furthermore, personnel exposure to radiological and physical hazards was significantly reduced by using heavy equipment rather than ''hands on'' techniques.« less

  7. Designed to deter: Barriers to facilities at secondary schools in Ghana

    PubMed Central

    Owusu-Ansah, Frances E.; Alorwu, Divine

    2012-01-01

    Background There are varied and complex problems associated with the admission of students with disabilities into secondary (senior high) schools all over the world. This situation is further complicated by difficulties encountered in the built environment of these institutions and, in this, Ghana is no exception. Objectives This exploratory study investigated the level of accessibility of the built environment in secondary schools in eight out of the ten regions of Ghana, in order to determine whether they conform to guidelines provided in international building standards and also assess the extent to which they have been designed and constructed to meet the provisions of the Persons with Disability Act 2006, which allows for equal access to public buildings in Ghana. Method In total, 705 building elements in 264 facilities were surveyed using international standards, building codes, regulations and guidelines. These facilities included car parks, classrooms, dormitories, assembly halls, telephone booths and administration blocks. Results Our findings revealed that most of the building elements were barring and not disability-friendly. Just to name a few: there were obstructions on access routes to and around buildings, absence of designated car parks, unfriendly vertical and horizontal means of circulation in buildings and lack of accessible sanitary accommodations. In addition, the general lighting and signage were poor. As a result, very few students with disabilities are admitted and retained in these schools. Conclusion Mainstreaming of people with disabilities into the Ghanaian educational system remains impossible unless urgent action is taken to alter the facilities at secondary schools. Based on this research outcome, recommendations have been made to the Ghanaian government and the Ghana Education Service, as well as non-governmental organisations and relevant professional bodies for the amelioration of the present situation in our secondary schools. PMID:28729972

  8. Site-specific standard request for underground storage tanks 1219-U, 1222-U, 2082-U, and 2068-U at the rust garage facility buildings 9754-1 and 9720-15: Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Facility ID No. 0-010117

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-01

    This document represents a Site-specific Standard Request for underground storage tanks (USTs) 1219-U,1222-U and 2082-U previously located at former Building 9754-1, and tank 2086-U previously located at Building 9720-15, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. The tanks previously contained petroleum products. For the purposes of this report, the two building sites will be regarded as a single UST site and will be referred to as the Rust Garage Facility. The current land use associated with the Y-12 Plant is light industrial and the operational period of the plant is projected to be at least 30 years. Thus, potential futuremore » residential exposures are not expected to occur for at least 30 years. Based on the degradation coefficient for benzene (the only carcinogenic petroleum constituent detected in soils or groundwater at the Rust Garage Facility), it is expected that the benzene and other contaminants at the site will likely be reduced prior to expiration of the 30-year plant operational period. As the original sources of petroleum contamination have been removed, and the area of petroleum contamination is limited, a site-specific standard is therefore being requested for the Rust Garage Facility.« less

  9. KSC-2011-1145

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony for its new environmentally friendly Propellants North Administrative and Maintenance Facility. This is a view of the parking lot where a solar-powered charging canopy is available for powering government or privately owned electric vehicles. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  10. KSC-2011-1144

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony for its new environmentally friendly Propellants North Administrative and Maintenance Facility. This is a view of the parking lot where a solar-powered charging canopy is available for powering government or privately owned electric vehicles. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Frankie Martin

  11. Optical characterization of contaminant film. [long duration exposure facility

    NASA Technical Reports Server (NTRS)

    Blakkolb, Brian K.; Yaung, James Y.; Kosic, Tom; Bowen, Howard

    1992-01-01

    The so called 'nicotine stain' documented at many locations on the Long Duration Exposure Facility is still unexplained as to the exact origin and mechanism of deposition, although enough is known to have some understanding of the conditions coincident for the formation of the deposits. Direct and scattered atomic oxygen flux, and solar ultraviolet radiation interacting with materials outgassing products have all been implicated in the formation of the dark brown contamination deposits. The nicotine stain represents a potential of performance degradation for spacecraft designed for long term operation in low Earth orbit and therefore, a need exists to characterize this form of spacecraft self contamination and quantify the impact on thermal/optical systems. Optical property measurements in the spectral range of 2 to 10 microns were performed on specimens of the contaminated film. Reflectance measurements of the contaminant film as deposited on the surface and as free standing films are presented along with transmission spectra for the bulk material. Thickness measurements along with micrographic examination of the cross section of the deposit reveal the layered structure of the deposit which further implicates solar illumination as a factor in the deposition mechanism.

  12. A facile synthesis of palladium nanoparticles supported on functional carbon nanotubes and its novel catalysis for ethanol electrooxidation.

    PubMed

    Chen, Xiao-mei; Lin, Zhi-jie; Jia, Tian-tian; Cai, Zhi-min; Huang, Xiao-li; Jiang, Ya-qi; Chen, Xi; Chen, Guo-nan

    2009-09-14

    In this study, a novel material, palladium nanoparticles-carboxylic functional carbon nanotubes (PdNPs-CFCNTs), based on PdNPs supported on CFCNTs was synthesized by a facile spontaneous redox method. The material reveals high electrochemical activity and excellent catalytic characteristic for alcohol electrooxidation on a glassy carbon electrode (GCE) in an alkaline medium. The preparation mechanism was studied by the galvanic cell effect between PdCl(4)(2-) and functional defect sites on CFCNTs. Results from UV-visible absorption spectroscopy and electrochemical impedance spectroscopy revealed that the reduction of PdCl(4)(2-) to metallic Pd was successfully achieved. Morphologies of PdNPs supporting on CFCNTs (PdNPs-CFCNTs) were also characterized by transmission electron micrograph. PdNPs-CFCNTs with the best electrocatalytic characteristics were obtained under the condition as: the weight ratio of Pd to CFCNTs was kept at 2:1, the temperature was kept at 70 degrees C in the synthesis, and the scan rate of the applied potential was selected at 60 mV s(-1). The results indicate that PdNPs-CFCNTs could be a great potential material in direct ethanol fuel cells and ethanol sensors.

  13. Energetic metallic ion implantation in polymers via cost-effective laser-driven ion source

    NASA Astrophysics Data System (ADS)

    Tahir, Muhammad Bilal; Rafique, M. Shahid; Ahmed, Rabia; Rafique, M.; Iqbal, Tahir; Hasan, Ali

    2017-07-01

    This research work reports the ions emission from the plasma generated by Nd:YAG laser having wavelength 1.064 μm, power 1.1 MW, pulse energy 10 mJ and intensity 1011 W/cm2 irradiated at 70° with respect to the target normal to the ions. These ions were accelerated through a home-made extraction assembly by means of a high voltage DC power supply. The energy of these ions were measured using Thomson parabola technique which utilizes Solid State Nuclear Track Detector (CR-39) and confirmed by Faraday cup as well that exploits a well-known technique known as time of flight. Interestingly, a significant increase in energy (from 490 to 730 keV) was observed with a discrete increase in acceleration potential from 0 to 18 kV. Polyethylene terephthalate (PET) and polypropylene were exposed to this recently developed ion source facility, to authenticate the reliability of this facility. The surface of the polymer is affected when energy of the irradiated ion is increased, which is evident from the optical micrographs. An increase in electrical conductivity was also observed with the increase in ion energy.

  14. 6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING CONSTRUCTION WAS HARDENED TO WITHSTAND THE FORCES IMPOSED BY A DESIGN-BASIS EARTHQUAKE OR TORNADO. (7/1/74) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  15. 18. VIEW OF THE SECOND FLOOR OF BUILDING 707. AIR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. VIEW OF THE SECOND FLOOR OF BUILDING 707. AIR EXHAUST FANS ARE USED TO MAINTAIN PRESSURE DIFFERENTIALS WITHIN THE BUILDING. (5/70) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  16. Facility Management as a Way of Reducing Costs in Transport Companies

    NASA Astrophysics Data System (ADS)

    Matusova, Dominika; Gogolova, Martina

    2017-10-01

    For facility management exists a several interpretations. These interpretations emerged progressively. At the time of the notion of facility management was designed to manage an administrative building, in the United States (US). They can ensure their operation and maintenance. From the US, this trend is further moved to Europe and now it start becoming a current and actual topic also in Slovakia. Facility management is contractually agreed scheme of services, semantically recalls traditional building management. There by finally pushed for activities related to real estates. For facility management is fundamental - certification and certification systems. Therefore, is essential to know, the cost structure of certification. The most commonly occurring austerity measures include: heat pumps, use of renewable energy, solar panels and water savings. These measures can reduce the cost.

  17. KSC-2011-1058

    NASA Image and Video Library

    2011-01-07

    CAPE CANAVERAL, Fla. -- Finishing touches adorn the second-floor conference room of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. The environmentally friendly facility is slated to be NASA's second Platinum-rated by the U.S. Green Building Council's (USGBC) Leadership in Environmental and Energy Design (LEED) certification system. It will be the space agency's first net-zero facility, which means it will produce enough energy onsite from renewable sources to offset what it requires to operate. The facility consists of a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy, and a single-story shop to store cryogenic fuel transfer equipment. Photo credit: NASA/Frankie Martin

  18. Initial operation of a solar heating and cooling system in a full-scale solar building test facility

    NASA Technical Reports Server (NTRS)

    Knoll, R. H.; Miao, D.; Hamlet, I. L.; Jensen, R. N.

    1976-01-01

    The Solar Building Test Facility (SBTF) located at Hampton, Virginia became operational in early summer of 1976. This facility is a joint effort by NASA-Lewis and NASA-Langley to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test performance of complete solar heating and cooling system, (3) investigate component interactions and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is given here, along with the objectives, test approach, expected system performance and some preliminary results.

  19. The NASA Langley building solar project and the supporting Lewis solar technology program

    NASA Technical Reports Server (NTRS)

    Ragsdale, R. G.; Namkoong, D.

    1974-01-01

    The use of solar energy to heat and cool a new office building that is now under construction is reported. Planned for completion in December 1975, the 53,000 square foot, single story building will utilize 15,000 square feet of various types of solar collectors in a test bed to provide nearly all of the heating demand and over half of the air conditioning demand. Drawing on its space-program-developed skills and resources in heat transfer, materials, and systems studies, NASA-Lewis will provide technology support for the Langley building project. A solar energy technology program underway at Lewis includes solar collector testing in an indoor solar simulator facility and in an outdoor test facility, property measurements of solar panel coatings, and operation of a laboratory-scale solar model system test facility. Based on results obtained in this program, NASA-Lewis will select and procure the solar collectors for the Langley test bed.

  20. Looking Northeast in Oxide Building at Reactors on Second Floor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking Northeast in Oxide Building at Reactors on Second Floor Including Reactor One (Left) and Reactor Two (Right) - Hematite Fuel Fabrication Facility, Oxide Building & Oxide Loading Dock, 3300 State Road P, Festus, Jefferson County, MO

  1. Finances and the Problems of America's School Buildings.

    ERIC Educational Resources Information Center

    Honeyman, David S.

    1994-01-01

    Discusses the history of financing school construction, and the condition of America's school buildings, including the age of school buildings, the cost and consequences of deferred maintenance, and the relationship of educational program to facilities. (SR)

  2. 4. SOUTH SIDE OF BUILDING 2, (HANDBALL COURT ADDITION) SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. SOUTH SIDE OF BUILDING 2, (HANDBALL COURT ADDITION) SHOWING RELATIONSHIP WITH GARAGE ADDITION OF BUILDING 1. - Chollas Heights Naval Radio Transmitting Facility, Helix House, 6410 Zero Road, San Diego, San Diego County, CA

  3. 36. SITE BUILDING 004 ELECTRIC POWER STATION CLOSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. SITE BUILDING 004 - ELECTRIC POWER STATION - CLOSE UP VIEW OF 1200 HORSEPOWER STANDBY POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  4. 37. SITE BUILDING 004 ELECTRIC POWER STATION ELEVATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. SITE BUILDING 004 - ELECTRIC POWER STATION - ELEVATED VIEW OF FIVE (5) 1200 HORSEPOWER STANDBY - POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. 4. VIEW LOOKING SOUTHEAST AT BUILDING 444. (1/1/98) Rocky ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. VIEW LOOKING SOUTHEAST AT BUILDING 444. (1/1/98) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  6. 5. VIEW LOOKING NORTHWEST OF BUILDING 444. (1/1/98) Rocky ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW LOOKING NORTHWEST OF BUILDING 444. (1/1/98) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  7. 17. Building 202, observation room for test cell, showing panel, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Building 202, observation room for test cell, showing panel, abort button, phones, and observation window. View looking northwest. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. 1. CONNECTING TUNNEL AT LEFT, CONTROL BUILDING B AT RIGHT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONNECTING TUNNEL AT LEFT, CONTROL BUILDING B AT RIGHT, VIEW TOWARDS SOUTHEAST - Glenn L. Martin Company, Titan Missile Test Facilities, Control Building B, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  9. Lightning and surge protection of large ground facilities

    NASA Astrophysics Data System (ADS)

    Stringfellow, Michael F.

    1988-04-01

    The vulnerability of large ground facilities to direct lightning strikes and to lightning-induced overvoltages on the power distribution, telephone and data communication lines are discussed. Advanced electrogeometric modeling is used for the calculation of direct strikes to overhead power lines, buildings, vehicles and objects within the facility. Possible modes of damage, injury and loss are discussed. Some appropriate protection methods for overhead power lines, structures, vehicles and aircraft are suggested. Methods to mitigate the effects of transients on overhead and underground power systems as well as within buildings and other structures are recommended. The specification and location of low-voltage surge suppressors for the protection of vulnerable hardware such as computers, telecommunication equipment and radar installations are considered. The advantages and disadvantages of commonly used grounding techniques, such as single point, multiple and isolated grounds are compared. An example is given of the expected distribution of lightning flashes to a large airport, its buildings, structures and facilities, as well as to vehicles on the ground.

  10. KSC-2011-1156

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony for the space agency's most environmentally friendly facility, the Propellants North Administrative and Maintenance Facility in Kennedy's Launch Complex 39 area. From left, are Mike Benik, director of Kennedy's Center Operations; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Bob Cabana, Kennedy's center director; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  11. Maintenance Trades Guidelines

    ERIC Educational Resources Information Center

    Weidner, Theodore J.

    2008-01-01

    In 2002, APPA published "Maintenance Staffing Guidelines for Educational Facilities," the first building maintenance trades staffing guideline designed to assist educational facilities professionals with their staffing needs. addresses how facilities professionals can determine the appropriate size and mix of their organization. Contents…

  12. KSC-2009-6798

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - Trenches are prepared to support the walls of the Propellants North Administrative and Maintenance Facility in Launch Complex 39 at NASA's Kennedy Space Center in Florida. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  13. KSC-2009-6797

    NASA Image and Video Library

    2009-12-11

    CAPE CANAVERAL, Fla. - Construction of the Propellants North Administrative and Maintenance Facility begins in Launch Complex 39 at NASA's Kennedy Space Center in Florida. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann

  14. A Proposal for the Consolidation of Dermatology Services of Walter Reed Army Medical Center and the National Naval Medical Center

    DTIC Science & Technology

    1999-08-01

    This includes the treatment of common skin conditions such as acne, dermatitis, psoriasis, vitiligo or alopecia to the more complex laser surgeries and...Phototherapy, Laser Surgery, Pediatric Dermatology, HIV Dermatology, Patch Testing, MOHS Micrographic Surgery, and Dermatologic Surgery. The entire...Dermatology Service is located on the first floor of the hospital. Minor surgical and MOHS Micrographic Surgery, ultraviolet treatment, and laser surgery

  15. Evidence from electron micrographs that icosahedral quasicrystals are icosahedral twins of cubic crystals.

    PubMed

    Pauling, L

    1990-10-01

    An analysis of electron micrographs of Al5Mn quasicrystals obtained by rapidly cooling a molten alloy with composition Al17Mn and removing the Al matrix by electrosolution, revealing aggregates of 20 microcrystals at the corners of a pentagonal dodecahedron, supports the proposal that these microcrystals are cubic crystals twinned about an icosahedral seed, with each cubic microcrystal sharing a threefold axis and three symmetry planes with the seed.

  16. Accurate determination of lattice parameters based on Niggli reduced cell theory by using digitized electron diffraction micrograph.

    PubMed

    Yang, Yi; Cai, Canying; Lin, Jianguo; Gong, Lunjun; Yang, Qibin

    2017-05-01

    In this paper, we used Niggli reduced cell theory to determine lattice constants of a micro/nano crystal by using electron diffraction patterns. The Niggli reduced cell method enhanced the accuracy of lattice constant measurement obviously, because the lengths and the angles of lattice vectors of a primitive cell can be measured directly on the electron micrographs instead of a double tilt holder. With the aid of digitized algorithm and least square optimization by using three digitized micrographs, a valid reciprocal Niggli reduced cell number can be obtained. Thus a reciprocal and real Bravais lattices are acquired. The results of three examples, i.e., Mg 4 Zn 7 , an unknown phase (Precipitate phase in nickel-base superalloy) and Ba 4 Ti 13 O 30 showed that the maximum errors are 1.6% for lengths and are 0.3% for angles. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Understanding Functional Adequacy and Facility Condition for Strategic Decision Making

    ERIC Educational Resources Information Center

    Dufresne, Ray

    2012-01-01

    At colleges and universities today, the increasing number of students is putting new pressure on facilities--and on facility staff. Student needs are also increasingly different, and most campus facilities have not kept up with the changing times. Facilities are expensive to build, maintain, and renovate, and costs are on the rise. Funds for…

  18. Jake Garn Mission Simulator and Training Facility, Building 5, Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Trish; Deming, Joan

    2010-01-01

    In response to President George W. Bush's announcement in January 2004 that the Space Shuttle Program (SSP) would end in 2010, the National Aeronautics and Space Administration (NASA) completed a nation-wide historical survey and evaluation of NASA-owned facilities and properties (real property assets) at all its Centers and component facilities. The buildings and structures which supported the SSP were inventoried and assessed as per the criteria of eligibility for listing in the National Register of Historic Places (NRHP) in the context of this program. This study was performed in compliance with Section 110 of the National Historic Preservation Act (NHPA) of 1966 (Public Law 89-665), as amended; the National Environmental Policy Act (NEPA) of 1969 (Public Law 91-190); Executive Order (EO) 11593: Protection and Enhancement of the Cultural Environment; EO 13287, Preserve America, and other relevant legislation. As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities at was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC's contractor, Archaeological Consultants, Inc. As a result of this survey, the Jake Gam Mission Simulator and Training Facility (Building 5) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 5 was still used to support the SSP as an astronaut training facility. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 5 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 5 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are also provided.

  19. 24 CFR 58.35 - Categorical exclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... use is not changed, and the footprint of the building is not increased in a floodplain or in a wetland..., reconstruction, or rehabilitation of public facilities and improvements (other than buildings) when the...) Rehabilitation of buildings and improvements when the following conditions are met: (i) In the case of a building...

  20. 5. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. EXTENSIONS TO BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. EXTENSIONS TO BUILDING 13 CLEARLY VISIBLE. ROM LEFT TO RIGHT, FORMER BUILDING 13, ADDITION WITH LARGE ROLL-UP DOOR, CANOPY 723. BUILDING 42 VISIBLE IN PERSPECTIVE LINE. - NASA Industrial Plant, Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  1. AERIAL VIEW OF BUILDING 460, LOOKING NORTHEAST. THE BUILDING WAS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AERIAL VIEW OF BUILDING 460, LOOKING NORTHEAST. THE BUILDING WAS CONSTRUCTED TO CONSOLIDATE ALL NON-NUCLEAR MANUFACTURING AT THE ROCKY FLATS PLANT INTO ONE FACILITY. (6/13/85) - Rocky Flats Plant, Stainless Steel & Non-Nuclear Components Manufacturing, Southeast corner of intersection of Cottonwood & Third Avenues, Golden, Jefferson County, CO

  2. Hurricane risk mitigation - Emergency Operations Center

    NASA Image and Video Library

    2008-07-29

    Construction work on a new Emergency Operations Center at Stennis Space Center is nearing completion. Construction is expected to be complete by February 2009, with actual occupancy of the building planned for later that year. The new building will house fire, medical and security teams and will provide a top-grade facility to support storm emergency responder teams and emergency management operations for the south Mississippi facility.

  3. TO BUILD OR NOT TO BUILD, A REPORT ON THE UTILIZATION AND PLANNING OF INSTRUCTIONAL FACILITIES IN SMALL COLLEGES.

    ERIC Educational Resources Information Center

    JAMRICH, JOHN X.

    A SOLUTION TO PROBLEMS OF GROWING COLLEGE ENROLLMENTS IS TO INCREASE THE EFFICIENCY OF USE OF EXISTING SPACE TO MAKE ROOM FOR MORE STUDENTS, RATHER THAN TO RESTRICT ENROLLMENTS OR TO CREATE MORE SPACE. PLANNING OF COLLEGE FACILITIES MUST INCLUDE ANALYSIS OF THE PRESENT PLANT, THE INSTRUCTIONAL PROGRAM, THE STUDENT BODY, AND THE FINANCIAL…

  4. 24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), INTERIOR VIEW LOOKING WEST AT NORTH END OF CENTRAL CORRIDOR (ROOM 3). STAIRWAY WORKBENCH WITH COMPRESSED-AIR POWERED CARTRIDGE LOADER. ARMORED PASS-THROUGH OF TRANSFER BOX FOR PASSING EXPLOSIVES MATERIALS THROUGH TO NEXT ROOM TO THE NORTH. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  5. DoD Is Not Properly Monitoring the Initiation of Maintenance for Facilities at Kandahar Airfield, Afghanistan (REDACTED)

    DTIC Science & Technology

    2013-09-30

    fire sprinkler system during the initial construction of the RSOI facilities. The construction contract to build the RSOI...International Building Code. Compliant manual and automatic fire alarm and notification systems , portable fire extinguishers, fire sprinkler systems ...automatic fire sprinkler system that was not operational, a fire department connection that was obstructed, and a fire detection system

  6. Considerations on Facilities Planning

    ERIC Educational Resources Information Center

    Baule, Steven

    2007-01-01

    Most facilities renovation projects occur because someone at the executive or board level has lobbied successfully for them. Often in public schools, the voters have agreed to the project as well via a building referendum. Therefore, facilities projects are highly visible to the community. Unlike many other issues in schools, facilities projects…

  7. Vehicle Thermal Management Facilities | Transportation Research | NREL

    Science.gov Websites

    Management Facilities Vehicle Thermal Management Facilities Image of a building with two semi truck evaluation facilities to develop advanced thermal management technologies for vehicles. Vehicle Testing and apparatus. Combined fluid loops bench research apparatus in the Vehicle Thermal Management Laboratory. Photo

  8. School Nutrition Facility Planning Guide.

    ERIC Educational Resources Information Center

    Pannell, Dorothy VanEgmond

    This publication is designed to help superintendents, local facilities coordinators, and food-service directors in planning the remodeling of an outdated food-service facility or the building of a new one. The introduction describes the roles of the local facility coordinator, the local child-nutrition director, the architect, the food-service…

  9. Laboratory Animal Facilities. Laboratory Design Notes.

    ERIC Educational Resources Information Center

    Jonas, Albert M.

    1965-01-01

    Design of laboratory animal facilities must be functional. Accordingly, the designer should be aware of the complex nature of animal research and specifically the type of animal research which will be conducted in a new facility. The building of animal-care facilities in research institutions requires special knowledge in laboratory animal…

  10. School Facilities Equity in California: An Empirical Study.

    ERIC Educational Resources Information Center

    Lowe, Davison Duane

    This is an equity study, focusing on the crowdedness and adequacy of California's public school facilities. Facilities data are from a 1988 state survey and include information about building space, age of facilities, air conditioning, and construction type. The research focuses on two equity principles: horizontal equity and facilities…

  11. 1. NEUTRAL BUOYANCY SIMULATOR BUILDING (NBS) EXTERIOR ELEVATION LOOKING NORTH; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. NEUTRAL BUOYANCY SIMULATOR BUILDING (NBS) EXTERIOR ELEVATION LOOKING NORTH; TANK BUILDING TO LEFT, CONTROL ROOM ETC. TO RIGHT OF CONNECTING BAY. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL

  12. Looking Southwest at First Floor View of Oxide Building Interior ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking Southwest at First Floor View of Oxide Building Interior Including Steam Lines, Weigh and Sample Hood, and Superheater - Hematite Fuel Fabrication Facility, Oxide Building & Oxide Loading Dock, 3300 State Road P, Festus, Jefferson County, MO

  13. 35. SITE BUILDING 004 ELECTRIC POWER STATION CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. SITE BUILDING 004 - ELECTRIC POWER STATION - CONTROL ROOM OF ELECTRIC POWER STATION WITH DIESEL ENGINE POWERED ELECTRIC GENERATION EQUIPMENT IN BACKGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  14. 5. WEST SIDE. VIEW FROM BUILDING 18 SHOWING SOUTH PORTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. WEST SIDE. VIEW FROM BUILDING 18 SHOWING SOUTH PORTION OF BUILDING 22 WITH TALLER NORTH PORTION BEYOND.. - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA

  15. 38. SITE BUILDING 004 ELECTRIC POWER STATION AT INTERIOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. SITE BUILDING 004 - ELECTRIC POWER STATION AT INTERIOR - OBLIQUE VIEW AT FLOOR LEVEL SHOWING DIESEL ENGINE/GENERATOR SET NUMBER 5. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  16. Looking southwest, this photograph demonstrates the northeast corner of E ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking southwest, this photograph demonstrates the northeast corner of E Building, with a glimpse of part of the east entrance - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  17. An image, looking east into Room 112A, filled with technical ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    An image, looking east into Room 112A, filled with technical equipment pertinent to the building's recent use - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  18. SIDE AND FRONT OF CONTROL BUILDING, CONNECTING TUNNEL VISIBLE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SIDE AND FRONT OF CONTROL BUILDING, CONNECTING TUNNEL VISIBLE AT FAR LEFT, VIEW TOWARDS NORTHEAST - Glenn L. Martin Company, Titan Missile Test Facilities, Control Building A, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  19. 30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...

  20. 30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...

  1. 30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...

  2. 30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...

  3. 30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...

  4. Avionics Systems Laboratory/Building 16. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia; Deming, Joan

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities that was conducted by NASA s Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Avionics Systems Laboratory (Building 16) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 16 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 16 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 16 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are also provided

  5. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus will take place in the Industrial Area at NASA's Kennedy Space Center in Florida. A scale model of the new facility and landscaping is on display for the ceremony. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  6. Advanced Energy Retrofit Guide (AERG): Practical Ways to Improve Energy Performance; Healthcare Facilities (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hendron, R.; Leach, M.; Bonnema, E.

    The Advanced Energy Retrofit Guide for Healthcare Facilities is part of a series of retrofit guides commissioned by the U.S. Department of Energy. By presenting general project planning guidance as well as detailed descriptions and financial payback metrics for the most important and relevant energy efficiency measures (EEMs), the guides provide a practical roadmap for effectively planning and implementing performance improvements in existing buildings. The Advanced Energy Retrofit Guides (AERGs) are intended to address key segments of the U.S. commercial building stock: retail stores, office buildings, K-12 schools, grocery stores, and healthcare facilities. The guides' general project planning considerations aremore » applicable nationwide; the energy and cost savings estimates for recommended EEMs were developed based on energy simulations and cost estimates for an example hospital tailored to five distinct climate regions. These results can be extrapolated to other U.S. climate zones. Analysis is presented for individual EEMs, and for packages of recommended EEMs for two project types: existing building commissioning projects that apply low-cost and no-cost measures, and whole-building retrofits involving more capital-intensive measures.« less

  7. 7. This photographic copy of an engineering drawing displays the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. This photographic copy of an engineering drawing displays the building's floor plan in its 1995 arrangement, with rooms designated. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office, "Addition to Weigh & Control Bldg. E-35, Demolition, Floor and Roof Plans," drawing no. E35/3-0, October 5, 1983. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA

  8. Calculation of the Strip Foundation on Solid Elastic Base, Taking into Account the Karst Collapse

    NASA Astrophysics Data System (ADS)

    Sharapov, R.; Lodigina, N.

    2017-07-01

    Karst processes greatly complicate the construction and operation of buildings and structures. Due to the karstic deformations at different times there have been several major accidents, which analysis showed that in all cases the fundamental errors committed at different stages of building development: site selection, engineering survey, design, construction or operation of the facilities. Theory analysis of beams on elastic foundation is essential in building practice. Specialist engineering facilities often have to resort to multiple designing in finding efficient forms of construction of these facilities. In work the calculation of stresses in cross-sections of the strip foundation evenly distributed load in the event of karst. A comparison of extreme stress in the event of karst and without accounting for the strip foundation as a beam on an elastic foundation.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    MATALUCCI,RUDOLPH V.; O'CONNOR,SHARON

    The mission of the Architectural Surety{trademark} program at Sandia National Laboratories is to assure the performance of buildings, facilities, and other infrastructure systems under normal, abnormal, and malevolent threat conditions. Through educational outreach efforts in the classroom, at conferences, and presentations such as this one, public and professional awareness of the need to defuse and mitigate such threats is increased. Buildings, airports, utilities, and other kinds of infrastructure deteriorate over time, as evidenced most dramatically by the crumbling cities and aging buildings, bridges, and other facility systems. Natural disasters such as tornadoes, earthquakes, hurricanes, and flooding also stress the materialsmore » and structural elements of the built environment. In addition, criminals, vandals, and terrorists attack federal buildings, dams, bridges, tunnels, and other public and private facilities. Engineers and architects are beginning to systematically consider these threats during the design, construction, and retrofit phases of buildings and infrastructures and are recommending advanced research in new materials and techniques. Existing building codes and standards do not adequately address nor protect the infrastructure or the public from many of these emerging threats. The activities in Sandia National Laboratories' Architectural Surety{trademark} efforts take a risk management approach to enhancing the safety, security, and reliability of the constructed environment. The technologies and techniques developed during Sandia's 50 years as the nation's lead laboratory for nuclear weapons surety are now being applied to assessing and reducing the vulnerability of dams, to enhancing the safety and security of staff in foreign embassies, and assuring the reliability of other federal facilities. High consequence surety engineering and design brings together technological advancements, new material requirements, systems integration, and risk management to improve the safety, security, and reliability of the as-built environment. The thrust of this paper is the role that new materials can play in protecting the infrastructure. Retrofits of existing buildings, innovative approaches to the design and construction of new facilities, and the mitigation of consequences in the event of an unpreventable disaster are some of the areas that new construction materials can benefit the Architectural Surety{trademark} of the constructed environment.« less

  10. KSC-2011-1059

    NASA Image and Video Library

    2011-01-07

    CAPE CANAVERAL, Fla. -- Finishing touches adorn the second-floor conference room of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. Artwork for the conference room was produced by Greg Lee, a graphics specialist with Abacus Technology Corp., with input from the facility's future occupants. The environmentally friendly facility is slated to be NASA's second Platinum-rated by the U.S. Green Building Council's (USGBC) Leadership in Environmental and Energy Design (LEED) certification system. It will be the space agency's first net-zero facility, which means it will produce enough energy onsite from renewable sources to offset what it requires to operate. The facility consists of a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy, and a single-story shop to store cryogenic fuel transfer equipment. Photo credit: NASA/Frankie Martin

  11. KSC-2011-1061

    NASA Image and Video Library

    2011-01-07

    CAPE CANAVERAL, Fla. -- Finishing touches adorn the second-floor conference room of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. Artwork for the conference room was produced by Greg Lee, a graphics specialist with Abacus Technology Corp., with input from the facility's future occupants. The environmentally friendly facility is slated to be NASA's second Platinum-rated by the U.S. Green Building Council's (USGBC) Leadership in Environmental and Energy Design (LEED) certification system. It will be the space agency's first net-zero facility, which means it will produce enough energy onsite from renewable sources to offset what it requires to operate. The facility consists of a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy, and a single-story shop to store cryogenic fuel transfer equipment. Photo credit: NASA/Frankie Martin

  12. Corrosion Chemistry in Inhibited HDA.

    DTIC Science & Technology

    1980-11-30

    mg HF. 200 B.1 Teflon PFA Reactor 201 (xviii) .. .. - i LIST OF MICROGRAPHS Micrograph Follows Page 4.1 A1/HDA x 1,000 80 4.2 A1/0.4 Wt % PF5 x 2,000...Ethylene Propylene copolymer Teflon PTFE Polytetrafluoroethylene Teflon PFA Perfluoroalkoxy fluorocarbon resin Spectroscopy IR (ir) Infra-red UV...fluoroplastic apparatus (to avoid any possible contamination by the reaction products of HF with glass). Iron powder (0.3g) was placed in a PFA screw-cap

  13. Plant-Mimetic Heat Pipes for Operation with Large Inertial and Gravitation Stresses

    DTIC Science & Technology

    2012-08-16

    tensiometer based on the integration of the membrane with a MEMS-based pressure sen heat transfer, biomimicry , microfluidics, plant science U U U U...stable at each tension. Inset shows an optical micrograph of 25 cavities; dark cavities are filled and bright cavities are empty (cavitated). (C... Optical micrograph of a silicon membrane that has been anodically etched from the top to form nano- porous silicon and wet etched from the bottom to

  14. Solid State Research.

    DTIC Science & Technology

    1983-02-15

    0.1 J/cm2 at 520 us, and Pulse Repetition Rate Was 10 Hs. 33 2-8 Nomarski Optical Micrograph of a Photodeposited Waveguide in LtNbO3 After Indiffusion...evaluate the interferometric array, the technique shown in Fig. 1-5 was used. With the two-mirror system shown, an incident planar wavefront could be...t- -’-, ,i- 1 0 110 - Fig. 2-8. Nomarski optical micrograph of a photodeposited waveguide in LiNbO3 after indiffusion. Small-scale divisions

  15. Simulation of local ion transport in lamellar block copolymer electrolytes based on electron micrographs

    DOE PAGES

    Chintapalli, Mahati; Higa, Kenneth; Chen, X. Chelsea; ...

    2016-12-19

    A method is presented in this paper to relate local morphology and ionic conductivity in a solid, lamellar block copolymer electrolyte for lithium batteries, by simulating conductivity through transmission electron micrographs. The electrolyte consists of polystyrene-block-poly(ethylene oxide) mixed with lithium bis(trifluoromethanesulfonyl) imide salt (SEO/LiTFSI), where the polystyrene phase is structural phase and the poly(ethylene oxide)/LiTFSI phase is ionically conductive. The electric potential distribution is simulated in binarized micrographs by solving the Laplace equation with constant potential boundary conditions. A morphology factor, f, is reported for each image by calculating the effective conductivity relative to a homogenous conductor. Images from twomore » samples are examined, one annealed with large lamellar grains and one unannealed with small grains. The average value off is 0.45 ± 0.04 for the annealed sample, and 0.37 ± 0.03 for the unannealed sample, both close to the value predicted by effective medium theory, 1/2. Simulated conductivities are compared to published experimental conductivities. The value of f Unannealed/f Annealed is 0.82 for simulations and 6.2 for experiments. Simulation results correspond well to predictions by effective medium theory but do not explain the experimental measurements. Finally, observation of nanoscale morphology over length scales greater than the size of the micrographs (~1 μm) may be required to explain the experimental results.« less

  16. Qualitative and quantitative interpretation of SEM image using digital image processing.

    PubMed

    Saladra, Dawid; Kopernik, Magdalena

    2016-10-01

    The aim of the this study is improvement of qualitative and quantitative analysis of scanning electron microscope micrographs by development of computer program, which enables automatic crack analysis of scanning electron microscopy (SEM) micrographs. Micromechanical tests of pneumatic ventricular assist devices result in a large number of micrographs. Therefore, the analysis must be automatic. Tests for athrombogenic titanium nitride/gold coatings deposited on polymeric substrates (Bionate II) are performed. These tests include microshear, microtension and fatigue analysis. Anisotropic surface defects observed in the SEM micrographs require support for qualitative and quantitative interpretation. Improvement of qualitative analysis of scanning electron microscope images was achieved by a set of computational tools that includes binarization, simplified expanding, expanding, simple image statistic thresholding, the filters Laplacian 1, and Laplacian 2, Otsu and reverse binarization. Several modifications of the known image processing techniques and combinations of the selected image processing techniques were applied. The introduced quantitative analysis of digital scanning electron microscope images enables computation of stereological parameters such as area, crack angle, crack length, and total crack length per unit area. This study also compares the functionality of the developed computer program of digital image processing with existing applications. The described pre- and postprocessing may be helpful in scanning electron microscopy and transmission electron microscopy surface investigations. © 2016 The Authors Journal of Microscopy © 2016 Royal Microscopical Society.

  17. The use of Mohs micrographic surgery (MMS) for melanoma in situ (MIS) of the trunk and proximal extremities.

    PubMed

    Stigall, Landon E; Brodland, David G; Zitelli, John A

    2016-11-01

    Evaluation of the entire surgical margin results in high rates of complete excision, low local recurrence rates, and maximal tissue conservation. Although well recognized for melanoma of the head and neck, few studies have focused exclusively on the trunk and proximal extremities. We sought to evaluate the efficacy of Mohs micrographic surgery for melanoma in situ (MIS) of the trunk and proximal extremities, and determine adequate excision margins for MIS when total margin evaluation is not used. Long-term outcomes in 882 cases of MIS treated with Mohs micrographic surgery were analyzed and compared with historical controls. Rates of complete excision were determined for increasing surgical margin intervals. One local recurrence occurred in our cohort (0.1%). Only 83% of MIS were excised with a 6-mm margin. Margins of 9 mm were needed to excise 97% of MIS, statistically equivalent to thin melanomas. We used a nonrandomized, single-institution, retrospective design. Mohs micrographic surgery may cure the 17% of MIS that exceed traditional excision margins of 5 mm and is a valuable option for these patients. Surgical margins of at least 0.9 cm should be considered for MIS of the trunk and extremities when total margin evaluation is not used. Copyright © 2016 American Academy of Dermatology, Inc. Published by Elsevier Inc. All rights reserved.

  18. Simulation of local ion transport in lamellar block copolymer electrolytes based on electron micrographs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chintapalli, Mahati; Higa, Kenneth; Chen, X. Chelsea

    A method is presented in this paper to relate local morphology and ionic conductivity in a solid, lamellar block copolymer electrolyte for lithium batteries, by simulating conductivity through transmission electron micrographs. The electrolyte consists of polystyrene-block-poly(ethylene oxide) mixed with lithium bis(trifluoromethanesulfonyl) imide salt (SEO/LiTFSI), where the polystyrene phase is structural phase and the poly(ethylene oxide)/LiTFSI phase is ionically conductive. The electric potential distribution is simulated in binarized micrographs by solving the Laplace equation with constant potential boundary conditions. A morphology factor, f, is reported for each image by calculating the effective conductivity relative to a homogenous conductor. Images from twomore » samples are examined, one annealed with large lamellar grains and one unannealed with small grains. The average value off is 0.45 ± 0.04 for the annealed sample, and 0.37 ± 0.03 for the unannealed sample, both close to the value predicted by effective medium theory, 1/2. Simulated conductivities are compared to published experimental conductivities. The value of f Unannealed/f Annealed is 0.82 for simulations and 6.2 for experiments. Simulation results correspond well to predictions by effective medium theory but do not explain the experimental measurements. Finally, observation of nanoscale morphology over length scales greater than the size of the micrographs (~1 μm) may be required to explain the experimental results.« less

  19. Facility Focus: Historic Renovations.

    ERIC Educational Resources Information Center

    College Planning & Management, 2002

    2002-01-01

    Describes the renovation of historic buildings at Rice University (conversion of the Chemistry Building into space for the biophysics and bioengineering departments) and at Princeton University (renovation of the Dial Lodge eating club into a building for the Bendheim Center for Finance). Includes photographs. (EV)

  20. Energy Systems Integration Facility Named Lab of the Year | News | NREL

    Science.gov Websites

    series of LEED Platinum high-performance buildings at NREL. Constructed by the design-build team of medium voltage outdoor testing areas. The total cost to build and equip ESIF was $135 million. "To

Top