Sample records for mius

  1. MIUS community conceptual design study

    NASA Technical Reports Server (NTRS)

    Fulbright, B. E.

    1976-01-01

    The feasibility, practicality, and applicability of the modular integrated utility systems (MIUS) concept to a satellite new-community development with a population of approximately 100,000 were analyzed. Two MIUS design options, the 29-MIUS-unit (option 1) and the 8-MIUS-unit (option 2) facilities were considered. Each resulted in considerable resource savings when compared to a conventional utility system. Economic analyses indicated that the total cash outlay and operations and maintenance costs for these two options were considerably less than for a conventional system. Computer analyses performed in support of this study provided corroborative data for the study group. An environmental impact assessment was performed to determine whether the MIUS meets or will meet necessary environmental standards. The MIUS can provide improved efficiency in the conservation of natural resources while not adversely affecting the physical environment.

  2. Technology evaluation of control/monitoring systems for MIUS application. [utility services management

    NASA Technical Reports Server (NTRS)

    Pringle, L. M., Jr.

    1974-01-01

    Potential ways of providing control and monitoring for the Modular Integrated Utility System (MIUS) program are elaborated. Control and monitoring hardware and operational systems are described. The requirements for the MIUS program and the development requirements are discussed.

  3. MIUS integration and subsystems test program

    NASA Technical Reports Server (NTRS)

    Beckham, W. S., Jr.; Shows, G. C.; Redding, T. E.; Wadle, R. C.; Keough, M. B.; Poradek, J. C.

    1976-01-01

    The MIUS Integration and Subsystems Test (MIST) facility at the Lyndon B. Johnson Space Center was completed and ready in May 1974 for conducting specific tests in direct support of the Modular Integrated Utility System (MIUS). A series of subsystems and integrated tests was conducted since that time, culminating in a series of 24-hour dynamic tests to further demonstrate the capabilities of the MIUS Program concepts to meet typical utility load profiles for a residential area. Results of the MIST Program are presented which achieved demonstrated plant thermal efficiencies ranging from 57 to 65 percent.

  4. Technology evaluation of heating, ventilation, and air conditioning for MIUS application

    NASA Technical Reports Server (NTRS)

    Gill, W. L.; Keough, M. B.; Rippey, J. O.

    1974-01-01

    Potential ways of providing heating, ventilation, and air conditioning for a building complex serviced by a modular integrated utility system (MIUS) are examined. Literature surveys were conducted to investigate both conventional and unusual systems to serve this purpose. The advantages and disadvantages of the systems most compatible with MIUS are discussed.

  5. The MIST /MIUS Integration and Subsystems Test/ laboratory - A testbed for the MIUS /Modular Integrated Utility System/ program

    NASA Technical Reports Server (NTRS)

    Beckham, W. S., Jr.; Keune, F. A.

    1974-01-01

    The MIUS (Modular Integrated Utility System) concept is to be an energy-conserving, economically feasible, integrated community utility system to provide five necessary services: electricity generation, space heating and air conditioning, solid waste processing, liquid waste processing, and residential water purification. The MIST (MIUS Integration and Subsystem Test) integrated system testbed constructed at the Johnson Space Center in Houston includes subsystems for power generation, heating, ventilation, and air conditioning (HVAC), wastewater management, solid waste management, and control and monitoring. The key design issues under study include thermal integration and distribution techniques, thermal storage, integration of subsystems controls and displays, incinerator performance, effluent characteristics, and odor control.

  6. Preliminary design study of a baseline MIUS

    NASA Technical Reports Server (NTRS)

    Wolfer, B. M.; Shields, V. E.; Rippey, J. O.; Roberts, H. L.; Wadle, R. C.; Wallin, S. P.; Gill, W. L.; White, E. H.; Monzingo, R.

    1977-01-01

    Results of a conceptual design study to establish a baseline design for a modular integrated utility system (MIUS) are presented. The system concept developed a basis for evaluating possible projects to demonstrate an MIUS. For the baseline study, climate conditions for the Washington, D.C., area were used. The baseline design is for a high density apartment complex of 496 dwelling units with a planned full occupancy of approximately 1200 residents. Environmental considerations and regulations for the MIUS installation are discussed. Detailed cost data for the baseline MIUS are given together with those for design and operating variations under climate conditions typified by Las Vegas, Nevada, Houston, Texas, and Minneapolis, Minnesota. In addition, results of an investigation of size variation effects, for 300 and 1000 unit apartment complexes, are presented. Only conceptual aspects of the design are discussed. Results regarding energy savings and costs are intended only as trend information and for use in relative comparisons. Alternate heating, ventilation, and air conditioning concepts are considered in the appendix.

  7. Technology survey of electrical power generation and distribution for MIUS application

    NASA Technical Reports Server (NTRS)

    Gill, W. L.; Redding, T. E.

    1975-01-01

    Candidate electrical generation power systems for the modular integrated utility systems (MIUS) program are described. Literature surveys were conducted to cover both conventional and exotic generators. Heat-recovery equipment associated with conventional power systems and supporting equipment are also discussed. Typical ranges of operating conditions and generating efficiencies are described. Power distribution is discussed briefly. Those systems that appear to be applicable to MIUS have been indicated, and the criteria for equipment selection are discussed.

  8. General survey of solid-waste management

    NASA Technical Reports Server (NTRS)

    Reese, T. G.; Wadle, R. C.

    1974-01-01

    Potential ways of providing solid-waste management for a building complex serviced by a modular integrated utility system (MIUS) were explored. Literature surveys were conducted to investigate both conventional and unusual systems to serve this purpose. The advantages and disadvantages of the systems most compatible with MIUS are discussed.

  9. MIUS Integration and Subsystem Test (MIST) data system

    NASA Technical Reports Server (NTRS)

    Pringle, L. M.

    1977-01-01

    A data system for use in testing integrated subsystems of a modular integrated utility system (MIUS) is presented. The MIUS integration and subsystem test (MIST) data system is reviewed from its conception through its checkout and operation as the controlling portion of the MIST facility. The MIST data system provides a real time monitoring and control function that allows for complete evaluation of the performance of the mechanical and electrical subsystems, as well as controls the operation of the various components of the system. In addition to the aforementioned capabilities, the MIST data system provides computerized control of test operations such that minimum manpower is necessary to set up, operate, and shut down subsystems during test periods.

  10. Social cost considerations and legal constraints in implementing modular integrated utility systems

    NASA Technical Reports Server (NTRS)

    Lede, N. W.; Dixon, H. W.; King, O.; Hill, D. K.

    1974-01-01

    Social costs associated with the design, demonstration, and implementation of the Modular Integrated Utility System are considered including the social climate of communities, leadership patterns, conflicts and cleavages, specific developmental values, MIUS utility goal assessment, and the suitability of certian alternative options for use in a program of implementation. General considerations are discussed in the field of socio-technological planning. These include guidelines for understanding the conflict and diversity; some relevant goal choices and ideas useful to planners of the MIUS facility.

  11. Computer simulation of thermal and fluid systems for MIUS integration and subsystems test /MIST/ laboratory. [Modular Integrated Utility System

    NASA Technical Reports Server (NTRS)

    Rochelle, W. C.; Liu, D. K.; Nunnery, W. J., Jr.; Brandli, A. E.

    1975-01-01

    This paper describes the application of the SINDA (systems improved numerical differencing analyzer) computer program to simulate the operation of the NASA/JSC MIUS integration and subsystems test (MIST) laboratory. The MIST laboratory is designed to test the integration capability of the following subsystems of a modular integrated utility system (MIUS): (1) electric power generation, (2) space heating and cooling, (3) solid waste disposal, (4) potable water supply, and (5) waste water treatment. The SINDA/MIST computer model is designed to simulate the response of these subsystems to externally impressed loads. The computer model determines the amount of recovered waste heat from the prime mover exhaust, water jacket and oil/aftercooler and from the incinerator. This recovered waste heat is used in the model to heat potable water, for space heating, absorption air conditioning, waste water sterilization, and to provide for thermal storage. The details of the thermal and fluid simulation of MIST including the system configuration, modes of operation modeled, SINDA model characteristics and the results of several analyses are described.

  12. Convenience, quality and choice: Patient and service-provider perspectives for treating primary care complaints in urgent care settings.

    PubMed

    Sturgeon, David

    2017-11-01

    To investigate why patients chose to attend two, nurse-led, minor injury units (MIUs) to access primary healthcare services rather than attend their GP practice. Since the 1980's, healthcare organisations in the UK and elsewhere have implemented an increasingly consumer-orientated model of healthcare provision. As a result, patients with non-urgent presentations are attending Emergency Departments (EDs) and other urgent care facilities in growing numbers. A comparative case study approach was adopted and between October 2014 and May 2015 the researcher was embedded as a participant observer as part of the emergency nurse practitioner team at two, nurse-led, MIUs (site A and B). During this time, 40 patients, 17 service-providers and 1 senior manager were interviewed. Patients and service-providers at both sites identified convenience and quality of care as the principle reasons patients presented for primary healthcare services at MIUs rather than their GP practice. Service-providers were aware that by providing treatment, they established a precedent and a sense of expectation for future care. Patients are acting rationally and predictably in response to healthcare policy promises regarding choice, expectation created by service-providers, and local demographic factors. Crown Copyright © 2017. Published by Elsevier Ltd. All rights reserved.

  13. Technology survey of computer software as applicable to the MIUS project

    NASA Technical Reports Server (NTRS)

    Fulbright, B. E.

    1975-01-01

    Existing computer software, available from either governmental or private sources, applicable to modular integrated utility system program simulation is surveyed. Several programs and subprograms are described to provide a consolidated reference, and a bibliography is included. The report covers the two broad areas of design simulation and system simulation.

  14. MIUS wastewater technology evaluation

    NASA Technical Reports Server (NTRS)

    Poradek, J. C.

    1976-01-01

    A modular integrated utility system wastewater-treatment process is described. Research in the field of wastewater treatment is reviewed, treatment processes are specified and evaluated, and recommendations for system use are made. The treatment processes evaluated are in the broad categories of preparatory, primary, secondary, and tertiary treatment, physical-chemical processing, dissolved-solids removal, disinfection, sludge processing, and separate systems. Capital, operating, and maintenance costs are estimated, and extensive references are given.

  15. Program document for Energy Systems Optimization Program 2 (ESOP2). Volume 1: Engineering manual

    NASA Technical Reports Server (NTRS)

    Hamil, R. G.; Ferden, S. L.

    1977-01-01

    The Energy Systems Optimization Program, which is used to provide analyses of Modular Integrated Utility Systems (MIUS), is discussed. Modifications to the input format to allow modular inputs in specified blocks of data are described. An optimization feature which enables the program to search automatically for the minimum value of one parameter while varying the value of other parameters is reported. New program option flags for prime mover analyses and solar energy for space heating and domestic hot water are also covered.

  16. Coal technology program progress report, February 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Final testing of the 20-atm bench-scale system is underway in preparation for experiments with hydrogen. Laboratory-scale testing of a number of inexpensive pure compounds to improve the settling rate of solids in Solvent Refined Coal (SRC) unfiltered oil (UFO), bench-scale testing of the effect of the Tretolite additive on settling, and characterization tests on a new sample of UFO from the PAMCO-SRC process are reported. Experimental engineering support of an in situ gasification process include low-temperature pyrolyses at exceptionally low heating rates (0.3/sup 0/C/min). Highly pyrophoric chars were consistently produced. Aqueous by-products from coal conversion technologies and oil shale retortingmore » have been analyzed directly to determine major organic components. A report is being prepared discussing various aspects of the engineering evaluations of nuclear process heat for coal. A bench-scale test program on thermochemical water splitting for hydrogen production is under consideration. In the coal-fueled MIUS program, preparations for procurement of tubing for the matrix in the fluidized-bed furnace and for fabrication of the furnace continued. Analyses of the AiResearch gas turbine and recuperator under coal-fueled MIUS operating conditions are near completion. Process flow diagrams and heat and material balances were completed for most of the units in the synthoil process. Overall utilities requirements were calculated and the coal preparation flowsheets were finalized. For hydrocarbonization, the flowsheet was revised to include additional coal data. Flowsheets were finalized for the acid gas separation and recycle, and the oil-solids separation. (LTN)« less

  17. National Dam Inspection Program. Black Creek Reservoir Dam (NY 00182) Mohawk River Basin, Town of Norway, Herkimer County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-09-14

    Conflicting stateetmto appear in various records as to the nature of the foundation soils under the embankment sections and Anhursen spillway section. in...one document the foundation soil is referred to as gravel and In another It is referred to as sand and clay. A drawing representing a stability...Spup.rr-. Mius (itGL-44.c kcA..) b. Land Use - Type FoF S-T c. Terrain - Relief -_OPr.S o; FeO, 51 6 To oS, d. Surface - Soil GLACIAL -01-L e. Runoff

  18. Exploring the relationship between general practice characteristics, and attendance at walk-in centres, minor injuries units and EDs in England 2012/2013: a cross-sectional study.

    PubMed

    Tammes, Peter; Morris, Richard W; Brangan, Emer; Checkland, Kath; England, Helen; Huntley, Alyson; Lasserson, Daniel; MacKichan, Fiona; Salisbury, Chris; Wye, Lesley; Purdy, Sarah

    2016-10-01

    For several years, EDs in the UK NHS have faced considerable increases in attendance rates. Walk-in centres (WiCs) and minor injuries units (MIUs) have been suggested as solutions. We aimed to investigate the associations between practice and practice population characteristics with ED attendance rates or combined ED/WiC/MIU attendance, and the associations between WiC/MIU and ED attendance. We used general practice-level data including 7462 English practices in 2012/2013 and present adjusted regression coefficients from linear multivariable analysis for relationships between patients' emergency attendance rates and practice characteristics. Every percentage-point increase in patients reporting inability to make an appointment was associated with an increase in emergency attendance by 0.36 (95% CI 0.06 to 0.66) per 1000 population. Percentage-point increases in patients unable to speak to a general practitioner (GP)/nurse within two workdays and patients able to speak often to their preferred GP were associated with increased emergency attendance/1000 population by 0.23 (95% CI 0.05 to 0.42) and 0.10 (95% CI 0.00 to 0.19), respectively. Practices in areas encompassing several towns (conurbations) had higher attendance than rural practices, as did practices with more non-UK-qualified GPs. Practice population characteristics associated with increased emergency attendance included higher unemployment rates, higher percentage of UK whites and lower male life expectancy, which showed stronger associations than practice characteristics. Furthermore, higher MIU or WiC attendance rates were associated with lower ED attendance rates. Improving availability of appointments and opportunities to speak a GP/nurse at short notice might reduce ED attendance. Establishing MIUs and WiCs might also reduce ED attendance. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  19. Coal Technology Program progress report, March 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Shakedown tests of the bench-scale hydrocarbonization system were successfully completed. Wyodak coal was fed to the reactor at a rate of 9.9 lb/hr where it was hydrocarbonized at 1050/sup 0/F under 20-atm hydrogen pressure. Laboratory results including settling tests, bench-scale settling tests, and sample ageing tests were continued. Two of ten compounds tested with the laboratory-scale apparatus were effective in increasing settling rates of solids in Solvent Refined Coal unfiltered oil, but bench-scale tests failed to show any improvements in the settling rate over the untreated SRC-UFO. Analytical chemistry efforts involved the removal and concentration of organic components in by-productmore » waters from fossil fuel conversion processes. A sephadex gel is being used to achieve hydrophilic-lipophilic separations in organic mixtures as a step in the analysis of fossil fuel related materials. Engineering Evaluations of the Synthiol and Hydrocarbonization Processes continued with the Synthiol process flow diagrams, heat and material balances, and utilities requirements being completed. Inspection techniques were developed for wear- and process-resistant coatings. Orders were placed for the Incoloy 800 tubing and a smaller quantity of Inconel 600 tubing for the tube matrix in the coal-fueled MIUS fluidized bed. An engineering feasibility review of General Atomic's proposal to ERDA for a bench-scale test program on thermochemical water splitting for hydrogen production was completed. (auth)« less

  20. Coal Technology Program progress report for April 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In the Hydrocarbonization Research program, two successful experiments were completed in the bench-scale hydrocarbonizer. A settling test at a lower temperature (390/sup 0/F) using 20 percent toluene in Solvent Refined Coal (SRC) Unfiltered Oil (UFO) produced a 30 percent clarified product in 2 hr. Characterization tests include distillation curves for Wilsonville's SRC-UFO and a particle size distribution of Pittsburg and Midway Coal Mining Company's (PAMCO) SRC-UFO. Studies of intermediate-temperature pyrolysis of large blocks have been maintained with char samples continuing to demonstrate pyrophoricity, even after heating to 700/sup 0/C. Simulated distillation analysis of tars produced by the last eight experimentsmore » are being compared with those performed at Laramie upon tars produced by the Hanna No. 2 experiment. In Coal-Fueled MIUS, stainless steel tubing to be used in one of the furnace tube bundles was ordered and the bid package for the furnace completed. Tests continued on the coal feed system and with the cold flow fluidized bed model. For the Synthoil process, flow diagrams, material balances, and utilities requirements were completed for the entire facility. For the Hydrocarbonization process, flowsheets were reviewed for compatibility; equipment lists were brought up to date; and utilities requirements were compiled from the individual flowsheets. The char recovery and storage subsystem flowsheet was completed. (auth)« less

  1. Collaborative practices in unscheduled emergency care: role and impact of the emergency care practitioner—qualitative and summative findings

    PubMed Central

    Cooper, Simon; O'Carroll, Judith; Jenkin, Annie; Badger, Beryl

    2007-01-01

    Objective To identify collaborative instances and hindrances and to produce a model of collaborative practice. Methods A 12‐month (2005–2006) mixed methods clinical case study was carried out in a large UK ambulance trust. Collaboration was measured through direct observational ratings of communication skills, teamwork and leadership with 24 multi‐professional emergency care practitioners (ECPs), interviews with 45 ECPs and stakeholders, and an audit of 611 patients Results Using a generic qualitative approach, observational records and interviews showed that ECPs' numerous links with other professions were influenced by three major themes as follows. (i) The ECP role: for example, “restricted transport codes” of communication, focus on reducing admissions, frustrations about patient tasking and conflicting views about leadership and team work. (ii) Education and training: drivers for multi‐professional clinically focussed graduate level education, requirements for skill development in minor injury units (MIUs) and general practice, and the need for clinical supervision/mentorship. (iii) Cultural perspectives: a “crew room” blue collar view of inter‐professional working versus emerging professional white collar views, power and communication conflicts, and a lack of understanding of the ECPs' role. The quantitative findings are reported elsewhere. Conclusions The final model of collaborative practice suggests that ECPs are having an impact on patient care, but that improvements can be made. We recommend the appointment of ECP clinical leads, degree level clinically focussed multi‐professional education, communication skills training, clinical supervision and multi‐professional ECP appointments. PMID:17711937

  2. Exploring the relationship between general practice characteristics and attendance at Walk-in Centres, Minor Injuries Units and Emergency Departments in England 2009/10-2012/2013: a longitudinal study.

    PubMed

    Tammes, Peter; Morris, Richard W; Brangan, Emer; Checkland, Kath; England, Helen; Huntley, Alyson; Lasserson, Daniel; MacKichan, Fiona; Salisbury, Chris; Wye, Lesley; Purdy, Sarah

    2017-08-08

    The UK National Health Service Emergency Departments (ED) have recently faced increasing attendance rates. This study investigated associations of general practice and practice population characteristics with emergency care service attendance rates. A longitudinal design with practice-level measures of access and continuity of care, patient population demographics and use of emergency care for the financial years 2009/10 to 2012/13. The main outcome measures were self-referred discharged ED attendance rate, and combined self-referred discharged ED, self-referred Walk-in Centre (WiC) and self-referred Minor Injuries Unit (MIU) attendance rate per 1000 patients. Multilevel models estimated adjusted regression coefficients for relationships between patients' emergency attendance rates and patients' reported satisfaction with opening hours and waiting time at the practice, proportion of patients having a preferred GP, and use of WiC and MIU, both between practices, and within practices over time. Practice characteristics associated with higher ED attendance rates included lower percentage of patients satisfied with waiting time (0.22 per 1% decrease, 95%CI 0.02 to 0.43) and lower percentage having a preferred GP (0.12 per 1% decrease, 95%CI 0.02 to 0.21). Population influences on higher attendance included more elderly, more female and more unemployed patients, and lower male life-expectancy and urban conurbation location. Net reductions in ED attendance were only seen for practices whose WiC or MIU attendance was high, above the 60th centile for MIU and above the 75th centile for WiC. Combined emergency care attendance fell over time if more patients within a practice were satisfied with opening hours (-0.26 per 1% increase, 95%CI -0.45 to -0.08). Practices with more patients satisfied with waiting time, having a preferred GP, and using MIU and WIC services, had lower ED attendance. Increases over time in attendance at MIUs, and patient satisfaction with opening hours was associated with reductions in service use.

Top