Sample records for modification installation calibration

  1. Recent modifications and calibration of the Langley low-turbulence pressure tunnel

    NASA Technical Reports Server (NTRS)

    Mcghee, R. J.; Beasley, W. D.; Foster, J. M.

    1984-01-01

    Modifications to the Langley Low-Turbulence Pressure Tunnel are presented and a calibration of the mean flow parameters in the test section is provided. Also included are the operational capability of the tunnel and typical test results for both single-element and multi-element airfoils. Modifications to the facility consisted of the following: replacement of the original cooling coils and antiturbulence screens and addition of a tunnel-shell heating system, a two dimensional model-support and force-balance system, a sidewall boundary layer control system, a remote-controlled survey apparatus, and a new data acquisition system. A calibration of the mean flow parameters in the test section was conducted over the complete operational range of the tunnel. The calibration included dynamic-pressure measurements, Mach number distributions, flow-angularity measurements, boundary-layer characteristics, and total-pressure profiles. In addition, test-section turbulence measurements made after the tunnel modifications have been included with these calibration data to show a comparison of existing turbulence levels with data obtained for the facility in 1941 with the original screen installation.

  2. The NASA Langley 16-Foot Transonic Tunnel: Historical Overview, Facility Description, Calibration, Flow Characteristics, and Test Capabilities

    NASA Technical Reports Server (NTRS)

    Capone, Francis J.; Bangert, Linda S.; Asbury, Scott C.; Mills, Charles T. L.; Bare, E. Ann

    1995-01-01

    The Langley 16-Foot Transonic Tunnel is a closed-circuit single-return atmospheric wind tunnel that has a slotted octagonal test section with continuous air exchange. The wind tunnel speed can be varied continuously over a Mach number range from 0.1 to 1.3. Test-section plenum suction is used for speeds above a Mach number of 1.05. Over a period of some 40 years, the wind tunnel has undergone many modifications. During the modifications completed in 1990, a new model support system that increased blockage, new fan blades, a catcher screen for the first set of turning vanes, and process controllers for tunnel speed, model attitude, and jet flow for powered models were installed. This report presents a complete description of the Langley 16-Foot Transonic Tunnel and auxiliary equipment, the calibration procedures, and the results of the 1977 and the 1990 wind tunnel calibration with test section air removal. Comparisons with previous calibrations showed that the modifications made to the wind tunnel had little or no effect on the aerodynamic characteristics of the tunnel. Information required for planning experimental investigations and the use of test hardware and model support systems is also provided.

  3. Aero-thermal Calibration of the NASA Glenn Icing Research Tunnel (2000 Tests)

    NASA Technical Reports Server (NTRS)

    Gonsalez, Jose C.; Arrington, E. Allen; Curry, Monroe R., III

    2001-01-01

    Aerothermal calibration measurements and flow quality surveys were made in the test section of the Icing Research Tunnel at the NASA Glenn Research Center. These surveys were made following major facility modifications including widening of the heat exchanger tunnel section, replacement of the heat exchanger, installation of new turning vanes, and installation of new fan exit guide vanes. Standard practice at NASA Glenn requires that test section calibration and flow quality surveys be performed following such major facility modifications. A single horizontally oriented rake was used to survey the flow field at several vertical positions within a single cross-sectional plane of the test section. These surveys provided a detailed mapping of the total and static pressure, total temperature, Mach number, velocity, flow angle and turbulence intensity. Data were acquired over the entire velocity and total temperature range of the facility. No icing conditions were tested; however, the effects of air sprayed through the water injecting spray bars were assessed. All data indicate good flow quality. Mach number standard deviations were less than 0.0017, flow angle standard deviations were between 0.3 deg and 0.8 deg, total temperature standard deviations were between 0.5 and 1.8 F for subfreezing conditions, axial turbulence intensities varied between 0.3 and 1.0 percent, and transverse turbulence intensities varied between 0.3 and 1.5 percent. Measurement uncertainties were also quantified.

  4. Development of a simple, self-contained flight test data acquisition system

    NASA Technical Reports Server (NTRS)

    Clarke, R.; Shane, D.; Roskam, J.; Rummer, D. I.

    1982-01-01

    The flight test system described combines state-of-the-art microprocessor technology and high accuracy instrumentation with parameter identification technology which minimize data and flight time requirements. The system was designed to avoid permanent modifications of the test airplane and allow quick installation. It is capable of longitudinal and lateral-directional stability and control derivative estimation. Details of this system, calibration and flight test procedures, and the results of the Cessna 172 flight test program are presented. The system proved easy to install, simple to operate, and capable of accurate estimation of stability and control parameters in the Cessna 172 flight tests.

  5. Cryogenic Test Capability at Marshall Space Flight Center's X-ray Cryogenic Test Facility

    NASA Technical Reports Server (NTRS)

    Kegley, Jeffrey; Baker, Mark; Carpenter, Jay; Eng, Ron; Haight, Harlan; Hogue, William; McCracken, Jeff; Siler, Richard; Wright, Ernie

    2006-01-01

    Marshall Space Flight Center's X-ray & Cryogenic Test Facility (XRCF) has been performing sub-liquid nitrogen temperature testing since 1999. Optical wavefront measurement, thermal structural deformation, mechanism functional & calibration, and simple cryo-conditioning tests have been completed. Recent modifications have been made to the facility in support of the James Webb Space Telescope (JWST) program. The chamber's payload envelope and the facility s refrigeration capacity have both been increased. Modifications have also been made to the optical instrumentation area improving access for both the installation and operation of optical instrumentation outside the vacuum chamber. The facility's capabilities, configuration, and performance data will be presented.

  6. Turbine blade and vane heat flux sensor development, phase 1

    NASA Technical Reports Server (NTRS)

    Atkinson, W. H.; Cyr, M. A.; Strange, R. R.

    1984-01-01

    Heat flux sensors available for installation in the hot section airfoils of advanced aircraft gas turbine engines were developed. Two heat flux sensors were designed, fabricated, calibrated, and tested. Measurement techniques are compared in an atmospheric pressure combustor rig test. Sensors, embedded thermocouple and the Gordon gauge, were fabricated that met the geometric and fabricability requirements and could withstand the hot section environmental conditions. Calibration data indicate that these sensors yielded repeatable results and have the potential to meet the accuracy goal of measuring local heat flux to within 5%. Thermal cycle tests and thermal soak tests indicated that the sensors are capable of surviving extended periods of exposure to the environment conditions in the turbine. Problems in calibration of the sensors caused by severe non-one dimensional heat flow were encountered. Modifications to the calibration techniques are needed to minimize this problem and proof testing of the sensors in an engine is needed to verify the designs.

  7. Turbine blade and vane heat flux sensor development, phase 1

    NASA Astrophysics Data System (ADS)

    Atkinson, W. H.; Cyr, M. A.; Strange, R. R.

    1984-08-01

    Heat flux sensors available for installation in the hot section airfoils of advanced aircraft gas turbine engines were developed. Two heat flux sensors were designed, fabricated, calibrated, and tested. Measurement techniques are compared in an atmospheric pressure combustor rig test. Sensors, embedded thermocouple and the Gordon gauge, were fabricated that met the geometric and fabricability requirements and could withstand the hot section environmental conditions. Calibration data indicate that these sensors yielded repeatable results and have the potential to meet the accuracy goal of measuring local heat flux to within 5%. Thermal cycle tests and thermal soak tests indicated that the sensors are capable of surviving extended periods of exposure to the environment conditions in the turbine. Problems in calibration of the sensors caused by severe non-one dimensional heat flow were encountered. Modifications to the calibration techniques are needed to minimize this problem and proof testing of the sensors in an engine is needed to verify the designs.

  8. Experimental assessment of the potential to decrease diesel NOx emissions beyond minimum requirements for Euro 6 Real Drive Emissions (RDE) compliance.

    PubMed

    Triantafyllopoulos, Georgios; Katsaounis, Dimitrios; Karamitros, Dimitrios; Ntziachristos, Leonidas; Samaras, Zissis

    2018-03-15

    The objective of this study was to test the potential for NO x emissions improvements on a typical Euro 6 diesel vehicle, following modifications to its emissions control system, under Real Drive Emissions (RDE) testing conditions. A commercially available car was selected and was first measured in its original configuration according to RDE on the road and an initial conformity factor (CF) of 5.4 was determined. Subsequent engine calibration and installation of a Selective Catalytic Reduction (SCR) device were conducted and tested on a fully transient engine dyno setup, which precisely reproduced the engine operation under the on-road RDE test. The NO x reduction achieved with those upgrades was 90%, leading to a CF of 0.53, with no CO 2 or fuel consumption penalty. These findings demonstrate that diesel vehicles can reach low NO x levels under real world driving conditions, when well-designed modern exhaust aftertreatment components are installed and properly calibrated. Copyright © 2017 Elsevier B.V. All rights reserved.

  9. SU-G-BRB-15: Verifications of Absolute and Relative Dosimetry of a Novel Stereotactic Breast Device: GammaPodTM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Becker, S; Mossahebi, S; Yi, B

    Purpose: A dedicated stereotactic breast radiotherapy device, GammaPod, was developed to treat early stage breast cancer. The first clinical unit was installed and commissioned at University of Maryland. We report our methodology of absolute dosimetry in multiple calibration conditions and dosimetric verifications of treatment plans produced by the system. Methods: GammaPod unit is comprised of a rotating hemi-spherical source carrier containing 36 Co-60 sources and a concentric tungsten collimator providing beams of 15 and 25 mm. Absolute dose calibration formalism was developed with modifications to AAPM protocols for unique geometry and different calibration medium (acrylic, polyethylene or liquid water). Breastmore » cup-size specific and collimator output factors were measured and verified with respect to Monte-Carlo simulations for single isocenter plans. Multiple isocenter plans were generated for various target size, location and cup-sizes in phantoms and 20 breast cancer patients images. Stereotactic mini-farmer chamber, OSL and TLD detectors as well as radio-chromic films were used for dosimetric measurements. Results: At the time of calibration (1/14/2016), absolute dose rate of the GammaPod was established to be 2.10 Gy/min in acrylic for 25 mm for sources installed in March 2011. Output factor for 15 mm collimator was measured to be 0.950. Absolute dose calibration was independently verified by IROC-Houston with a TLD/Institution ratio of 0.99. Cup size specific output measurements in liquid water for single isocenter were found to be within 3.0% of MC simulations. Point-dose measurements of multiple isocenter treatment plans were found to be within −1.0 ± 1.2 % of treatment planning system while 2-dimensional gamma analysis yielded a pass rate of 97.9 ± 2.2 % using gamma criteria of 3% and 2mm. Conclusion: The first GammaPod treatment unit for breast stereotactic radiotherapy was successfully installed, calibrated and commissioned for patient treatments. An absolute dosimetry and dosimetric verification protocols were successfully created.« less

  10. The new MSFC Solar vector magnetograph. Center director's discretionary fund

    NASA Technical Reports Server (NTRS)

    Hagyard, M. J.; West, E. A.; Cumings, N. P.

    1984-01-01

    The unique MSFC solar vector magnetograph allows measurements of all three components of the Sun's photospheric magnetic field over a wide field-of-view with spatial resolution determined by a 2.7 x 2.7 arc second pixel size. This system underwent extensive modifications to improve its sensitivity and temporal response. The modifications included replacing an SEC vidicon detector with a solid-state CCD camera; replacing the original digital logic circuitry with an electronic controller and a computer to provide complete, programmable control over the entire operation of the magnetograph; and installing a new polarimeter which consists of a single electro-optical modulator coupled with interchangeable waveplates mounted on a rotating assembly. The system is described and results of calibrations and tests are presented. Initial observations of solar magnetic fields with the new magnetograph are presented.

  11. Soil specific re-calibration of water content sensors for a field-scale sensor network

    NASA Astrophysics Data System (ADS)

    Gasch, Caley K.; Brown, David J.; Anderson, Todd; Brooks, Erin S.; Yourek, Matt A.

    2015-04-01

    Obtaining accurate soil moisture data from a sensor network requires sensor calibration. Soil moisture sensors are factory calibrated, but multiple site specific factors may contribute to sensor inaccuracies. Thus, sensors should be calibrated for the specific soil type and conditions in which they will be installed. Lab calibration of a large number of sensors prior to installation in a heterogeneous setting may not be feasible, and it may not reflect the actual performance of the installed sensor. We investigated a multi-step approach to retroactively re-calibrate sensor water content data from the dielectric permittivity readings obtained by sensors in the field. We used water content data collected since 2009 from a sensor network installed at 42 locations and 5 depths (210 sensors total) within the 37-ha Cook Agronomy Farm with highly variable soils located in the Palouse region of the Northwest United States. First, volumetric water content was calculated from sensor dielectric readings using three equations: (1) a factory calibration using the Topp equation; (2) a custom calibration obtained empirically from an instrumented soil in the field; and (3) a hybrid equation that combines the Topp and custom equations. Second, we used soil physical properties (particle size and bulk density) and pedotransfer functions to estimate water content at saturation, field capacity, and wilting point for each installation location and depth. We also extracted the same reference points from the sensor readings, when available. Using these reference points, we re-scaled the sensor readings, such that water content was restricted to the range of values that we would expect given the physical properties of the soil. The re-calibration accuracy was assessed with volumetric water content measurements obtained from field-sampled cores taken on multiple dates. In general, the re-calibration was most accurate when all three reference points (saturation, field capacity, and wilting point) were represented in the sensor readings. We anticipate that obtaining water retention curves for field soils will improve the re-calibration accuracy by providing more precise estimates of saturation, field capacity, and wilting point. This approach may serve as an alternative method for sensor calibration in lieu of or to complement pre-installation calibration.

  12. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: FID calibrationTHC FID optimization, and THC FID verification Calibrate all FID analyzers: upon initial installation and after major maintenance.Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon...

  13. 41 CFR 101-39.304 - Modification or installation of accessory equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.3-Use and Care of GSA Interagency Fleet Management System Vehicles § 101-39.304 Modification or installation of accessory equipment. The modification of a GSA Interagency Fleet Management System (IFMS) vehicle or the permanent installation of...

  14. Calibration of Elasto-Magnetic Sensors on In-Service Cable-Stayed Bridges for Stress Monitoring.

    PubMed

    Cappello, Carlo; Zonta, Daniele; Laasri, Hassan Ait; Glisic, Branko; Wang, Ming

    2018-02-05

    The recent developments in measurement technology have led to the installation of efficient monitoring systems on many bridges and other structures all over the world. Nowadays, more and more structures have been built and instrumented with sensors. However, calibration and installation of sensors remain challenging tasks. In this paper, we use a case study, Adige Bridge, in order to present a low-cost method for the calibration and installation of elasto-magnetic sensors on cable-stayed bridges. Elasto-magnetic sensors enable monitoring of cable stress. The sensor installation took place two years after the bridge construction. The calibration was conducted in two phases: one in the laboratory and the other one on site. In the laboratory, a sensor was built around a segment of cable that was identical to those of the cable-stayed bridge. Then, the sample was subjected to a defined tension force. The sensor response was compared with the applied load. Experimental results showed that the relationship between load and magnetic permeability does not depend on the sensor fabrication process except for an offset. The determination of this offset required in situ calibration after installation. In order to perform the in situ calibration without removing the cables from the bridge, vibration tests were carried out for the estimation of the cables' tensions. At the end of the paper, we show and discuss one year of data from the elasto-magnetic sensors. Calibration results demonstrate the simplicity of the installation of these sensors on existing bridges and new structures.

  15. Calibration of Elasto-Magnetic Sensors on In-Service Cable-Stayed Bridges for Stress Monitoring

    PubMed Central

    Ait Laasri, Hassan; Glisic, Branko; Wang, Ming

    2018-01-01

    The recent developments in measurement technology have led to the installation of efficient monitoring systems on many bridges and other structures all over the world. Nowadays, more and more structures have been built and instrumented with sensors. However, calibration and installation of sensors remain challenging tasks. In this paper, we use a case study, Adige Bridge, in order to present a low-cost method for the calibration and installation of elasto-magnetic sensors on cable-stayed bridges. Elasto-magnetic sensors enable monitoring of cable stress. The sensor installation took place two years after the bridge construction. The calibration was conducted in two phases: one in the laboratory and the other one on site. In the laboratory, a sensor was built around a segment of cable that was identical to those of the cable-stayed bridge. Then, the sample was subjected to a defined tension force. The sensor response was compared with the applied load. Experimental results showed that the relationship between load and magnetic permeability does not depend on the sensor fabrication process except for an offset. The determination of this offset required in situ calibration after installation. In order to perform the in situ calibration without removing the cables from the bridge, vibration tests were carried out for the estimation of the cables’ tensions. At the end of the paper, we show and discuss one year of data from the elasto-magnetic sensors. Calibration results demonstrate the simplicity of the installation of these sensors on existing bridges and new structures. PMID:29401751

  16. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  17. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  18. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  19. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  20. Calibration and Testing of Digital Zenith Camera System Components

    NASA Astrophysics Data System (ADS)

    Ulug, Rasit; Halicioglu, Kerem; Tevfik Ozludemir, M.; Albayrak, Muge; Basoglu, Burak; Deniz, Rasim

    2017-04-01

    Starting from the beginning of the new millennium, thanks to the Charged-Coupled Device (CCD) technology, fully or partly automatic zenith camera systems are designed and used in order to determine astro-geodetic deflections of the vertical components in several countries, including Germany, Switzerland, Serbia, Latvia, Poland, Austria, China and Turkey. The Digital Zenith Camera System (DZCS) of Turkey performed successful observations yet it needs to be improved in terms of automating the system and increasing observation accuracy. In order to optimize the observation time and improve the system, some modifications have been implemented. Through the modification process that started at the beginning of 2016, some DZCS components have been replaced with the new ones and some new additional components have been installed. In this presentation, the ongoing calibration and testing process of the DZCS are summarized in general. In particular, one of the tested system components is the High Resolution Tiltmeter (HRTM), which enable orthogonal orientation of DZCS to the direction of plump line, is discussed. For the calibration of these components, two tiltmeters with different accuracies (1 nrad and 0.001 mrad) were observed nearly 30 days. The data recorded under different environmental conditions were divided into hourly, daily, and weekly subsets. In addition to the effects of temperature and humidity, interoperability of two tiltmeters were also investigated. Results show that with the integration of HRTM and the other implementations, the modified DZCS provides higher accuracy for the determination of vertical deflections.

  1. Performance evaluation and calibration of a modular multiband radiometer for remote sensing field research

    NASA Technical Reports Server (NTRS)

    Robinson, B. F.; Buckley, R. E.; Burgess, J. A. (Principal Investigator)

    1982-01-01

    A multiband radiometer suitable for operation from helicopter, small plane, truck, or tripod platforms was developed. The standard unit is equipped with the seven thematic mapper spectral bands with an added band from 1.5 to 1.30 microns; however, up to eight user specified bands from 0.4 to 15 microns may be installed under clean field conditions. Results of prototype tests of the spectral responsivity of the detectors, the transmittance of the optical filters as a function of wavelength, the fields of view, and the system linearity, temperature stability, noise performance, and dynamic range were evaluated. Minor modifications were made to the instrument and the results of final testing are reported.

  2. Accurate calibration of waveform data measured by the Plasma Wave Experiment on board the ARASE satellite

    NASA Astrophysics Data System (ADS)

    Kitahara, M.; Katoh, Y.; Hikishima, M.; Kasahara, Y.; Matsuda, S.; Kojima, H.; Ozaki, M.; Yagitani, S.

    2017-12-01

    The Plasma Wave Experiment (PWE) is installed on board the ARASE satellite to measure the electric field in the frequency range from DC to 10 MHz, and the magnetic field in the frequency range from a few Hz to 100 kHz using two dipole wire-probe antennas (WPT) and three magnetic search coils (MSC), respectively. In particular, the Waveform Capture (WFC), one of the receivers of the PWE, can detect electromagnetic field waveform in the frequency range from a few Hz to 20 kHz. The Software-type Wave Particle Interaction Analyzer (S-WPIA) is installed on the ARASE satellite to measure the energy exchange between plasma waves and particles. Since S-WPIA uses the waveform data measured by WFC to calculate the relative phase angle between the wave magnetic field and velocity of energetic electrons, the high-accuracy is required to calibration of both amplitude and phase of the waveform data. Generally, the calibration procedure of the signal passed through a receiver consists of three steps; the transformation into spectra, the calibration by the transfer function of a receiver, and the inverse transformation of the calibrated spectra into the time domain. Practically, in order to reduce the side robe effect, a raw data is filtered by a window function in the time domain before applying Fourier transform. However, for the case that a first order differential coefficient of the phase transfer function of the system is not negligible, the phase of the window function convoluted into the calibrated spectra is shifted differently at each frequency, resulting in a discontinuity in the time domain of the calibrated waveform data. To eliminate the effect of the phase shift of a window function, we suggest several methods to calibrate a waveform data accurately and carry out simulations assuming simple sinusoidal waves as an input signal and using transfer functions of WPT, MSC, and WFC obtained in pre-flight tests. In consequence, we conclude that the following two methods can reduce an error contaminated through the calibration to less than 0.1 % of amplitude of input waves; (1) a Turkey-type window function with a flat top region of one-third of the window length and (2) modification of the window function for each frequency by referring the estimation of the phase shift due to the first order differential coefficient from the transfer functions.

  3. Strain gage installation and survivability on geosynthetics used in flexible pavements

    NASA Astrophysics Data System (ADS)

    Brooks, Jeremy A.

    The use of foil type strain gages on geosynthetics is poorly documented. In addition, very few individuals are versed in proper installation techniques or calibration methods. Due to the limited number of knowledgeable technicians there is no information regarding the susceptibility of theses gages to errors in installation by inexperienced installers. Also lacking in the documentation related to the use of foil type strain gages on geosynthetics is the survivability of the gages in field conditions. This research documented procedures for installation, calibration, and survivability used by the project team to instruments a full scale field installation in Marked Tree, AR. This research also addressed sensitivity to installation errors on both geotextile and geogrid. To document the process of gage installation an experienced technician, Mr. Joe Ables, formerly of the UASCE Waterways Experiment Station, was consulted. His techniques were combined with those discovered in related literature and those developed by the research team to develop processes that were adaptable to multiple gage geometries and parent geosynthetics. These processes were described and documented in a step by step manner with accompanying photographs, which should allow virtually anyone with basic electronics knowledge to install these gages properly. Calibration of the various geosynthetic / strain gage combinations was completed using wide width tensile testing on multiple samples of each material. The tensile testing process was documented and analyzed using digital photography to analyze strain on the strain gage itself. Calibration factors for each geosynthtics used in the full scale field testing were developed. In addition, the process was thoroughly documented to allow future researchers to calibrate additional strain gage and geosynthetic combinations. The sensitivity of the strain gages to installation errors was analyzed using wide width tensile testing and digital photography to determine the variability of the data collected from gages with noticeable installation errors as compared to properly installed gages. Induced errors varied based on the parent geosynthetics material, but included excessive and minimal waterproofing, gage rotation, gage shift, excessive and minimal adhesive, and excessive and minimal adhesive impregnation loads. The results of this work indicated that minor errors in geotextile gage installation that are noticeable and preventable by the experienced installer have no statistical significance on the data recorded during the life span of geotextile gages; however the lifespan of the gage may be noticeably shortened by such errors. Geogrid gage installation errors were found to cause statistically significant changes in the data recorded from improper installations. The issue of gage survivability was analyzed using small scale test sections instrumented and loaded similarly to field conditions anticipated during traditional roadway construction. Five methods of protection were tested for both geotextile and geogrid including a sand blanket, inversion, semi-hemispherical PCV sections, neoprene mats, and geosynthetic wick drain. Based on this testing neoprene mats were selected to protect geotextile installed gages, and wick drains were selected to protect geogrid installed gages. These methods resulted in survivability rates of 73% and 100% in the full scale installation respectively. This research and documentation may be used to train technicians to install and calibrate geosynthetic mounted foil type strain gages. In addition, technicians should be able to install gages in the field with a high probability of gage survivability using the protection methods recommended.

  4. Preliminary designs for X-ray source modifications for the Marshall Space Flight Center's X-ray calibration facility

    NASA Technical Reports Server (NTRS)

    Croft, W. L.

    1986-01-01

    The objective of this investigation is to develop preliminary designs for modifications to the X-ray source of the MSFC X-Ray Calibration Facility. Recommendations are made regarding: (1) the production of an unpolarized X-ray beam, (2) modification of the source to provide characteristic X-rays with energies up to 40 keV, and (3) addition of the capability to calibrate instruments in the extreme ultraviolet wavelength region.

  5. Modification and Validation of an Automotive Data Processing Unit, Compessed Video System, and Communications Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, R.J.

    1997-04-01

    The primary purpose of the "modification and validation of an automotive data processing unit (DPU), compressed video system, and communications equipment" cooperative research and development agreement (CRADA) was to modify and validate both hardware and software, developed by Scientific Atlanta, Incorporated (S-A) for defense applications (e.g., rotary-wing airplanes), for the commercial sector surface transportation domain (i.e., automobiles and trucks). S-A also furnished a state-of-the-art compressed video digital storage and retrieval system (CVDSRS), and off-the-shelf data storage and transmission equipment to support the data acquisition system for crash avoidance research (DASCAR) project conducted by Oak Ridge National Laboratory (ORNL). In turn,more » S-A received access to hardware and technology related to DASCAR. DASCAR was subsequently removed completely and installation was repeated a number of times to gain an accurate idea of complete installation, operation, and removal of DASCAR. Upon satisfactory completion of the DASCAR construction and preliminary shakedown, ORNL provided NHTSA with an operational demonstration of DASCAR at their East Liberty, OH test facility. The demonstration included an on-the-road demonstration of the entire data acquisition system using NHTSA'S test track. In addition, the demonstration also consisted of a briefing, containing the following: ORNL generated a plan for validating the prototype data acquisition system with regard to: removal of DASCAR from an existing vehicle, and installation and calibration in other vehicles; reliability of the sensors and systems; data collection and transmission process (data integrity); impact on the drivability of the vehicle and obtrusiveness of the system to the driver; data analysis procedures; conspicuousness of the vehicle to other drivers; and DASCAR installation and removal training and documentation. In order to identify any operational problems not captured by the systems testing and evaluation, the validation plan also addressed a short-term pilot research program to manipulate DASCAR under operational conditions using "naive" drivers. The effort exercised the fill capabilities of the data acquisition system. ORNL subsequently evaluated and pilot tested the data acquisition system using the validation plan. The plan was implemented in full at the NHTSA East Liberty, OH test facility, and was carried out as a cooperative effort with the Vehicle Research and Test Center staff. ORNL determined the reliability of the sensors and systems by exercising DASCAR For one vehicle type, ORNL evaluated systems reliability over a continuous period of 30 days with particular attention paid to maintenance of calibration and data integrity.« less

  6. Electron beam deflection control system of a welding and surface modification installation

    NASA Astrophysics Data System (ADS)

    Koleva, E.; Dzharov, V.; Gerasimov, V.; Tsvetkov, K.; Mladenov, G.

    2018-03-01

    In the present work, we examined the patterns of the electron beam motion when controlling the transverse with respect to the axis of the beam homogeneous magnetic field created by the coils of the deflection system the electron gun. During electron beam processes, the beam motion is determined the process type (welding, surface modification, etc.), the technological mode, the design dimensions of the electron gun and the shape of the processed samples. The electron beam motion is defined by the cumulative action of two cosine-like control signals generated by a functional generator. The signal control is related to changing the amplitudes, frequencies and phases (phase differences) of the generated voltages. We realized the motion control by applying a graphical user interface developed by us and an Arduino Uno programmable microcontroller. The signals generated were calibrated using experimental data from the available functional generator. The free and precise motion on arbitrary trajectories determines the possible applications of an electron beam process to carrying out various scientific research tasks in material processing.

  7. A Method of Calibrating Airspeed Installations on Airplanes at Transonic and Supersonic Speeds by the Use of Accelerometer and Attitude-Angle Measurements

    NASA Technical Reports Server (NTRS)

    Zalovick, John A; Lina, Lindsay J; Trant, James P , Jr

    1953-01-01

    A method is described for calibrating airspeed installation on airplanes at transonic and supersonic speeds in vertical-plane maneuvers in which use is made of measurements of normal and longitudinal accelerations and attitude angle. In this method all the required instrumentation is carried within the airplane. An analytical study of the effects of various sources of error on the accuracy of an airspeed calibration by the accelerometer method indicated that the required measurements can be made accurately enough to insure a satisfactory calibration.

  8. 40 CFR 1065.325 - Intake-flow calibration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 1065.325 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calibrations and Verifications Flow-Related Measurements § 1065.325 Intake-flow calibration. (a) Calibrate intake-air flow meters upon initial installation. Follow the...

  9. An investigation of turbulence structure in a low-Reynolds-number incompressible turbulent boundary

    NASA Technical Reports Server (NTRS)

    White, B. R.; Strataridakis, C. J.

    1987-01-01

    An existing high turbulence intensity level (5%) atmospheric boundary-layer wind tunnel has been successfully converted to a relatively low level turbulence (0.3%) wind tunnel through extensive modification, testing, and calibration. A splitter plate was designed, built, and installed into the wind-tunnel facility to create thick, mature, two-dimensional turbulent boundary layer flow at zero pressure gradient. Single and cross hot-wire measurements show turbulent boundary layer characteristics of good quality with unusually large physical size, i.e., viscous sublayer of the order of 1 mm high. These confirm the potential ability of the tunnel to be utilized for future high-quality near-wall turbulent boundary layer measurements. It compares very favorably with many low turbulence research tunnels.

  10. Ground station hardware for the ATS-F millimeter wave experiment

    NASA Technical Reports Server (NTRS)

    Duffield, T. L.

    1973-01-01

    The results are presented of a program to design, fabricate, test, and install a primary ATS-F millimeter wave ground receiving station. Propagation parameters at millimeter waves are discussed along with the objective of the overall experiment. A general description is given of the receiving system and its function in the experiment. Typical receiver characteristics are presented which show that the experiment is entirely feasible from a link SNR standpoint. The receiving system hardware designs are discussed with separate treatment given to the propagation and the radiometer receiver designs. The modification and relocation are described of an existing 15-ft antenna to meet the ATS-F requirements. The design of a dual frequency feed subsystem and self calibration equipment is included.

  11. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon...

  12. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...

  13. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...

  14. Development of a Flow Field for Testing a Boundary-Layer-Ingesting Propulsor

    NASA Technical Reports Server (NTRS)

    Hirt, Stefanie M.; Arend, David J.; Wolter, John D.; Johnson, Aaron

    2017-01-01

    In order to test embedded-propulsor technology, modifications were required of the 8x6 Supersonic Wind tunnel at NASA Glenn Research Center. The extent of the modifications required that a new tunnel calibration be completed to generate a new calibration dataset and operational procedures for the tunnel, as well as to map the boundary layer on the raised floor. This report describes the propulsor inflow that was to be simulated, documents the tunnel modifications that were required, and conveys the results of the calibration test that was completed to measure the resulting flow properties.

  15. 40 CFR 86.116-94 - Calibrations, frequency and overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... positive displacement pump or Critical Flow Venturi shall be calibrated following initial installation... an organic gas retention and calibration on the evaporative emissions enclosure (see § 86.117-90(c)). (4) Calibrate the gas meters or flow instrumentation used for providing total flow measurement for...

  16. Longitudinal changes in everyday life after home modifications for people aging with disabilities.

    PubMed

    Petersson, Ingela; Kottorp, Anders; Bergström, Jakob; Lilja, Margareta

    2009-05-01

    To investigate longitudinal impacts of home modifications on the difficulty of performing everyday life tasks for people aging with disabilities, and to investigate whether other factors had any additional impacts on difficulty in everyday life tasks for people receiving home modifications. The sample consisted of 103 persons aging with disabilities and in need of home modifications, divided into an intervention group and a comparison group. The data were first subjected to Rasch analysis and a random coefficient model was used. Participants in the intervention group reported a significantly lower level of difficulty in everyday life tasks compared with those in the comparison group. One confounding factor, number of months waiting for home modification, had an impact on difficulty in everyday life. Home modifications are effective in decreasing difficulty in performing everyday life tasks up to six months after the installation. Furthermore, to be effective home modifications need to be installed in a timely fashion. For each consecutive month the person waited for their home modification the difficulty of performing everyday life tasks increased. Therefore, it is important that home modifications be installed as soon as possible after the need has been identified.

  17. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  18. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  19. Active transmission isolation/rotor loads measurement system

    NASA Technical Reports Server (NTRS)

    Kenigsberg, I. J.; Defelice, J. J.

    1973-01-01

    Modifications were incorporated into a helicopter active transmission isolation system to provide the capability of utilizing the system as a rotor force measuring device. These included; (1) isolator redesign to improve operation and minimize friction, (2) installation of pressure transducers in each isolator, and (3) load cells in series with each torque restraint link. Full scale vibration tests performed during this study on a CH-53A helicopter airframe verified that these modifications do not degrade the systems wide band isolation characteristics. Bench tests performed on each isolator unit indicated that steady and transient loads can be measured to within 1 percent of applied load. Individual isolator vibratory load measurement accuracy was determined to be 4 percent. Load measurement accuracy was found to be independent of variations in all basic isolator operating characteristics. Full scale system load calibration tests on the CH-53A airframe established the feasibility of simultaneously providing wide band vibration isolation and accurate measurement of rotor loads. Principal rotor loads (lift, propulsive force, and torque) were measured to within 2 percent of applied load.

  20. A new approach on JPSS VIIRS BCS and SVS PRT calibration

    NASA Astrophysics Data System (ADS)

    Wang, Tung R.; Marschke, Steve; Borroto, Michael; Jones, Christopher M.; Chovit, Christopher

    2015-05-01

    A set of calibrated platinum resistance thermometers (PRT's) was used to monitor the temperature of a Blackbody Calibration Source (BCS) and Space View Source (SVS). BCS is Ground Support Equipment (GSE) used to validate the emissive band calibration of Visible Infrared Imaging Radiometer Suite (VIIRS) of the Joint Polar Satellite System (JPSS). Another GSE, the SVS was used as an optical simulator to provide zero radiance sources for all VIIRS bands. The required PRT temperature 1 uncertainty is less than 0.030K. A process was developed to calibrate the PRTs in its thermal block by selecting a single thermal bath fluid that is compatible with spaceflight, is easy to clean and supported the entire temperature range. The process involves thermal cycling the PRTs that are installed in an aluminum housing using RTV566A prior to calibration. The PRTs were calibrated thermal cycled again and then calibrated once more to verify repeatability. Once completed these PRTs were installed on both the BCS and SVS. The PRT calibration uncertainty was estimated and deemed sufficient to support the effective temperature requirements for the operating temperature range of the BCS and SVS.

  1. Calibration of strain-gage installations in aircraft structures for the measurement of flight loads

    NASA Technical Reports Server (NTRS)

    Skopinski, T H; Aiken, William S , Jr; Huston, Wilber B

    1954-01-01

    A general method has been developed for calibrating strain-gage installations in aircraft structures, which permits the measurement in flight of the shear or lift, the bending moment, and the torque or pitching moment on the principal lifting or control surfaces. Although the stress in structural members may not be a simple function of the three loads of interest, a straightforward procedure is given for numerically combining the outputs of several bridges in such a way that the loads may be obtained. Extensions of the basic procedure by means of electrical combination of the strain-gage bridges are described which permit compromises between strain-gage installation time, availability of recording instruments, and data reduction time. The basic principles of strain-gage calibration procedures are illustrated by reference to the data for two aircraft structures of typical construction, one a straight and the other a swept horizontal stabilizer.

  2. PSL Icing Facility Upgrade Overview

    NASA Technical Reports Server (NTRS)

    Griffin, Thomas A.; Dicki, Dennis J.; Lizanich, Paul J.

    2014-01-01

    The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, the PSL is capable of simulating icing events at altitude in a groundtest facility. The system was designed to operate at altitudes from 4,000 to 40,000 ft at Mach numbers up to 0.8M and inlet total temperatures from -60 to +15 degF. This paper and presentation will be part of a series of presentations on PSL Icing and will cover the development of the icing capability through design, developmental testing, installation, initial calibration, and validation engine testing. Information will be presented on the design criteria and process, spray bar developmental testing at Cox and Co., system capabilities, and initial calibration and engine validation test. The PSL icing system was designed to provide NASA and the icing community with a facility that could be used for research studies of engine icing by duplicating in-flight events in a controlled ground-test facility. With the system and the altitude chamber we can produce flight conditions and cloud environments to simulate those encountered in flight. The icing system can be controlled to set various cloud uniformities, droplet median volumetric diameter (MVD), and icing water content (IWC) through a wide variety of conditions. The PSL chamber can set altitudes, Mach numbers, and temperatures of interest to the icing community and also has the instrumentation capability of measuring engine performance during icing testing. PSL last year completed the calibration and initial engine validation of the facility utilizing a Honeywell ALF502-R5 engine and has duplicated in-flight roll back conditions experienced during flight testing. This paper will summarize the modifications and buildup of the facility to accomplish these tests.

  3. 40 CFR 60.3038 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...

  4. 40 CFR 60.3038 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...

  5. Reliability of High-Temperature Fixed-Point Installations over 8 Years

    NASA Astrophysics Data System (ADS)

    Elliott, C. J.; Ford, T.; Ongrai, O.; Pearce, J. V.

    2017-12-01

    At NPL, high-temperature metal-carbon eutectic fixed points have been set up for thermocouple calibration purposes since 2006, for realising reference temperatures above the highest point specified in the International Temperature Scale of 1990 for contact thermometer calibrations. Additionally, cells of the same design have been provided by NPL to other national measurement institutes (NMIs) and calibration laboratories over this period, creating traceable and ISO 17025 accredited facilities around the world for calibrating noble metal thermocouples at 1324 {°}C (Co-C) and 1492 {°}C (Pd-C). This paper shows collections of thermocouple calibration results obtained during use of the high-temperature fixed-point cells at NPL and, as further examples, the use of cells installed at CCPI Europe (UK) and NIMT (Thailand). The lifetime of the cells can now be shown to be in excess of 7 years, whether used on a weekly or monthly basis, and whether used in an NMI or industrial calibration laboratory.

  6. Calibrating the SNfactory Integral Field Spectrograph (SNIFS) with SCALA

    NASA Astrophysics Data System (ADS)

    Küsters, Daniel; Lombardo, Simona; Kowalski, Marek; Aldering, Greg; Nordin, Jakob; Rigault, Mickael

    2016-08-01

    The SNIFS CALibration Apparatus (SCALA), a device to calibrate the Supernova Integral Field Spectrograph on the University Hawaii 2.2m telescope, was developed and installed in Spring 2014. SCALA produces an artificial planet with a diameter of 1° and a constant surface brightness. The wavelength of the beam can be tuned between 3200 Å and 10000 Å and has a bandwidth of 35 Å. The amount of light injected into the telescope is monitored with NIST calibrated photodiodes. SCALA was upgraded in 2015 with a mask installed at the entrance pupil of the UH88 telescope, ensuring that the illumination of the telescope by stars is similar to that of SCALA. With this setup, a first calibration run was performed in conjunction with the spectrophotometric observations of standard stars. We present first estimates for the expected systematic uncertainties of the in-situ calibration and discuss the results of tests that examine the influence of stray light produced in the optics.

  7. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  8. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  9. Analysis of suspended solids transport processes in primary settling tanks.

    PubMed

    Patziger, Miklós; Kiss, Katalin

    2015-01-01

    The paper shows the results of a long-term research comprising FLUENT-based numerical modeling, in situ measurements and laboratory tests to analyze suspended solids (SS) transport processes in primary settling tanks (PSTs). The investigated PST was one of the rectangular horizontal flow PSTs at a large municipal wastewater treatment plant (WWTP) of a capacity of 500,000 population equivalent. Many middle-sized and large WWTPs are equipped with such PSTs. The numerical PST model was calibrated and validated based on the results of comprehensive in situ flow and SS concentration measurements from low (5 m/h) up to quite high surface overflow rates of 9.5 and 13.0 m/h and on settling and other laboratory tests. The calibrated and validated PST model was also successfully used for evaluation of some slight modifications of the inlet geometry (removing lamellas, installing a flocculation 'box', shifting the inlet into a 'bottom-near' or into a 'high' position), which largely affect PST behavior and performance. The investigations provided detailed insight into the flow and SS transport processes within the investigated PST, which strongly contributes to hydrodynamically driven design and upgrading of PSTs.

  10. Installation and calibration of Kayzero-assisted NAA in three Central European countries via a Copernicus project.

    PubMed

    De Corte, F; van Sluijs, R; Simonits, A; Kucera, J; Smodis, B; Byrne, A R; De Wispelaere, A; Bossus, D; Frána, J; Horák, Z; Jaćimović, R

    2001-09-01

    An account is given of the installation and calibration of k0-based NAA--assisted by the DSM Kayzero/Solcoi software package--at the KFKI-AEKI, Budapest, the NPI, Rez and the IJS, Ljubljana. Not only the calibration of the Ge-detectors and the irradiation facilities are discussed, but also other important topics such as gamma-spectrometric hard- and software, QC/QA of the IRMM-530 Al-Au flux monitor and the upgrade of the Kayzero/Solcoi code. The work was performed in the framework of a European Copernicus JRP, coordinated by the Laboratory of Analytical Chemistry, Gent, with DSM Research, Geleen, as the industrial partner.

  11. The Closed Orbit Measurement System at the DELTA Synchrotron Radiation Facility And First Investigations Concerning the Installation of a Beam Based BPM Calibration System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jankowiak, A.; Wille, K.; /Dortmund U. /SLAC

    2011-08-25

    For a synchrotron radiation source it is necessary to operate a monitoring system to determine the beam position with high resolution and accuracy with respect to the axis of the quadrupole magnets. In this paper the present closed orbit measurement system of the DELTA SR-Facility, concerning the hardware setup, data processing and the calibration methods, will be presented. The results of the calibration measurements and the recent operating experience will be discussed. These results show, that the system is close to the design resolution. But the BPM offsets with respect to the magnetic center of the quadrupole magnets turn outmore » to be not acceptable. For some BPMs they are in the order of several 100 micro m. Therefore it was decided to install a beam based BPM calibration system in the near future . This system should allow to determine the BPM offsets relative to the center of the quadrupole magnets for all 40 BPMs. It is planned to install a system in order to change the focussing strength of each quadrupole individually either in a static or dynamic way.« less

  12. Procedures and criteria for increasing the earthquake resistance level of electrical substations and special installations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Couch, R.W.; Deacon, R.J.

    1973-09-30

    This report defines a procedure and provides basic information needed to determine the modifications required to make electrical substations and special installations of the Bonneville Power Administration (BPA) more resistant to strong earthquake ground motion. It also provides a procedure for developing an effective plan for establishing the sequence, or priority, of providing the required modifications.

  13. 43 CFR 3275.16 - What standards apply to installing and maintaining meters?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; (2) You must calibrate meters measuring steam or hot water flow with a turbine, vortex, ultrasonics... frequent; and (3) You must calibrate meters measuring steam or hot water flow with an orifice plate...

  14. 43 CFR 3275.16 - What standards apply to installing and maintaining meters?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; (2) You must calibrate meters measuring steam or hot water flow with a turbine, vortex, ultrasonics... frequent; and (3) You must calibrate meters measuring steam or hot water flow with an orifice plate...

  15. 43 CFR 3275.16 - What standards apply to installing and maintaining meters?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; (2) You must calibrate meters measuring steam or hot water flow with a turbine, vortex, ultrasonics... frequent; and (3) You must calibrate meters measuring steam or hot water flow with an orifice plate...

  16. 43 CFR 3275.16 - What standards apply to installing and maintaining meters?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; (2) You must calibrate meters measuring steam or hot water flow with a turbine, vortex, ultrasonics... frequent; and (3) You must calibrate meters measuring steam or hot water flow with an orifice plate...

  17. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a manner...

  18. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installed in each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag... hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner or operator must install, calibrate, maintain, and operate a CEMS for monitoring hydrogen chloride emissions discharged to...

  19. Influence of Installation Errors On the Output Data of the Piezoelectric Vibrations Transducers

    NASA Astrophysics Data System (ADS)

    Kozuch, Barbara; Chelmecki, Jaroslaw; Tatara, Tadeusz

    2017-10-01

    The paper examines an influence of installation errors of the piezoelectric vibrations transducers on the output data. PCB Piezotronics piezoelectric accelerometers were used to perform calibrations by comparison. The measurements were performed with TMS 9155 Calibration Workstation version 5.4.0 at frequency in the range of 5Hz - 2000Hz. Accelerometers were fixed on the calibration station in a so-called back-to-back configuration in accordance with the applicable international standard - ISO 16063-21: Methods for the calibration of vibration and shock transducers - Part 21: Vibration calibration by comparison to a reference transducer. The first accelerometer was calibrated by suitable methods with traceability to a primary reference transducer. Each subsequent calibration was performed when changing one setting in relation to the original calibration. The alterations were related to negligence and failures in relation to the above-mentioned standards and operating guidelines - e.g. the sensor was not tightened or appropriate substance was not placed. Also, there was modified the method of connection which was in the standards requirements. Different kind of wax, light oil, grease and other assembly methods were used. The aim of the study was to verify the significance of standards requirements and to estimate of their validity. The authors also wanted to highlight the most significant calibration errors. Moreover, relation between various appropriate methods of the connection was demonstrated.

  20. Halo current diagnostic system of experimental advanced superconducting tokamak

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, D. L.; Shen, B.; Sun, Y.

    2015-10-15

    The design, calibration, and installation of disruption halo current sensors for the Experimental Advanced Superconducting Tokamak are described in this article. All the sensors are Rogowski coils that surround conducting structures, and all the signals are analog integrated. Coils with two different cross-section sizes have been fabricated, and their mutual inductances are calibrated. Sensors have been installed to measure halo currents in several different parts of both the upper divertor (tungsten) and lower divertor (graphite) at several toroidal locations. Initial measurements from disruptions show that the halo current diagnostics are working well.

  1. Registering upper atmosphere parameters in East Siberia with Fabry—Perot Interferometer KEO Scientific "Arinae"

    NASA Astrophysics Data System (ADS)

    Vasilyev, Roman; Artamonov, Maksim; Beletsky, Aleksandr; Zherebtsov, Geliy; Medvedeva, Irina; Mikhalev, Aleksandr; Syrenova, Tatyana

    2017-09-01

    We describe the Fabry–Perot interferometer designed to study Earth’s upper atmosphere. We propose a modification of the existing data processing method for determining the Doppler shift and Doppler widening and also for separating the observed line intensity and the background intensity. The temperature and wind velocity derived from these parameters are compared with physical characteristics obtained from modeling (NRLMSISE-00, HWM14). We demonstrate that the temperature is determined from the oxygen 630 nm line irrespective of the hydroxyl signal existing in interference patterns. We show that the interferometer can obtain temperature from the oxygen 557.7 nm line in case of additional calibration of the device. The observed wind velocity mainly agrees with model data. Night variations in the red and green oxygen lines quite well coincide with those in intensities obtained by devices installed nearby the interferometer.

  2. Modifications to the Langley 8-foot transonic pressure tunnel for the laminar flow control experiment

    NASA Technical Reports Server (NTRS)

    Harris, Charles D.; Brooks, Cuyler W., Jr.

    1988-01-01

    Modifications to the NASA Langley 8 Foot Transonic Pressure Tunnel in support of the Lamina Flow Control (LFC) Experiment included the installation of a honeymoon and five screens in the settling chamber upstream of the test section 41-long test section liner that extended from the upstream end of the test section contraction region, through the best section, and into the diffuser. The honeycomb and screens were installed as permanent additions to the facility, and the liner was a temporary addition to be removed at the conclusion of the LFC Experiment. These modifications are briefly described.

  3. 75 FR 27662 - Special Conditions: Boeing 747-468, Installation of a Medical Lift

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ...; Notice No. 25-99-11-SC] Special Conditions: Boeing 747-468, Installation of a Medical Lift AGENCY... Aviation, will have a novel or unusual design feature associated with the installation of a medical lift... modification includes the installation of a medical lift between the main deck and upper deck. The lift allows...

  4. 40 CFR 63.1383 - Monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... manufacturing facility must prepare for each glass-melting furnace, rotary spin manufacturing line, and flame... glass-melting furnace, the owner or operator shall install, calibrate, maintain, and continuously... monitors. (v) A triboelectric bag leak detection system shall be installed, operated, adjusted, and...

  5. 40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuously operate a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a...

  6. Compact blackbody calibration sources for in-flight calibration of spaceborne infrared instruments

    NASA Astrophysics Data System (ADS)

    Scheiding, S.; Driescher, H.; Walter, I.; Hanbuch, K.; Paul, M.; Hartmann, M.; Scheiding, M.

    2017-11-01

    High-emissivity blackbodies are mandatory as calibration sources in infrared radiometers. Besides the requirements on the high spectral emissivity and low reflectance, constraints regarding energy consumption, installation space and mass must be considered during instrument design. Cavity radiators provide an outstanding spectral emissivity to the price of installation space and mass of the calibration source. Surface radiation sources are mainly limited by the spectral emissivity of the functional coating and the homogeneity of the temperature distribution. The effective emissivity of a "black" surface can be optimized, by structuring the substrate with the aim to enlarge the ratio of the surface to its projection. Based on the experiences of the Mercury Radiometer and Thermal Infrared Spectrometer (MERTIS) calibration source MBB3, the results of the surface structuring on the effective emissivity are described analytically and compared to the experimental performance. Different geometries are analyzed and the production methods are discussed. The high-emissivity temperature calibration source features values of 0.99 for wavelength from 5 μm to 10 μm and emissivity larger than 0.95 for the spectral range from 10 μm to 40 μm.

  7. (Sn)DICE: A Calibration System Designed for Wide Field Imagers

    NASA Astrophysics Data System (ADS)

    Regnault, N.; Barrelet, E.; Guyonnet, A.; Juramy, C.; Rocci, P.-F.; Le Guillou, L.; Schahmanèche, K.; Villa, F.

    2016-05-01

    Dark Energy studies with type Ia supernovae set very tight constraints on the photometric calibration of the imagers used to detect the supernovae and follow up their flux variations. Among the key challenges is the measurement of the shape and normalization of the instrumental throughput. The DICE system was developed by members of the Supernova Legacy Survey (SNLS) , building upon the lessons learnt working with the MegaCam imager. It consists in a very stable light source, placed in the telescope enclosure, and generating compact, conical beams, yielding an almost flat illumination of the imager focal plane. The calibration light is generated by narrow spectrum LEDs selected to cover the entire wavelength range of the imager. It is monitored in real time using control photodiodes. A first DICE demonstrator, SnDICE has been installed at CFHT. A second generation instrument (SkyDICE) has been installed in the enclosure of the SkyMapper telescope. We present the main goals of the project. We discuss the main difficulties encoutered when trying to calibrate a wide field imager, such as MegaCam (or SkyMapper) using such a calibrated light source.

  8. Operations manual for portable profiler : installing and using the portable profiler.

    DOT National Transportation Integrated Search

    2010-06-01

    This manual is divided into two sections. The first is using the UTA-Profiler Program : with the portable profiler for generating surface profilers. The second is installing the : portable profiler module on a typical van or truck. The calibration an...

  9. Guide for fabricating and installing shallow ground water observation wells

    Treesearch

    Carolyn C. Bohn

    2001-01-01

    The fabrication and use of three tools to assist in the manual installation of shallow ground water observation wells are described. These tools are easily fabricated at a local machine shop. A method for calibrating pressure transducers is also described.

  10. 40 CFR 63.2163 - If I monitor fermenter exhaust, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-accuracy test PS 8 requires. (3) If you continuously monitor VOC emissions using gas chromatography, you... percent of the span value (or more than 10 percent of the calibration gas value if your CEMS is a gas... calibration drift exceeds 5 percent of the span value (or more than 20 percent of the calibration gas value...

  11. 40 CFR 63.2163 - If I monitor fermenter exhaust, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-accuracy test PS 8 requires. (3) If you continuously monitor VOC emissions using gas chromatography, you... percent of the span value (or more than 10 percent of the calibration gas value if your CEMS is a gas... calibration drift exceeds 5 percent of the span value (or more than 20 percent of the calibration gas value...

  12. Modeling water quality effects of structural and operational changes to Scoggins Dam and Henry Hagg Lake, Oregon

    USGS Publications Warehouse

    Sullivan, Annett B.; Rounds, Stewart A.

    2006-01-01

    To meet water quality targets and the municipal and industrial water needs of a growing population in the Tualatin River Basin in northwestern Oregon, an expansion of Henry Hagg Lake is under consideration. Hagg Lake is the basin's primary storage reservoir and provides water during western Oregon's typically dry summers. Potential modifications include raising the dam height by 6.1 meters (20 feet), 7.6 meters (25 feet), or 12.2 meters (40 feet); installing additional outlets (possibly including a selective withdrawal tower); and adding additional inflows to provide greater reliability of filling the enlarged reservoir. One method of providing additional inflows is to route water from the upper Tualatin River through a tunnel and into Sain Creek, a tributary to the lake. Another option is to pump water from the Tualatin River (downstream of the lake) uphill and into the reservoir during the winter--the 'pump-back' option. A calibrated CE-QUAL-W2 model of Henry Hagg Lake's hydrodynamics, temperature, and water quality was used to examine the effect of these proposed changes on water quality in the lake and downstream. Most model scenarios were run with the calibrated model for 2002, a typical water year; a few scenarios were run for 2001, a drought year. More...

  13. Contamination control program plan for the ultraviolet spectrometer experiment, revision E

    NASA Technical Reports Server (NTRS)

    Gilmore, D. B.

    1972-01-01

    The contamination control program plan delineates the cleanliness requirements to be attained and maintained, and the methods to be utilized, in the fabrication, handling, test, calibration, shipment, pre-installation checkout and installation for the ultraviolet spectrometer experiment prototype, qualification and flight equipment.

  14. A simultaneously calibration approach for installation and attitude errors of an INS/GPS/LDS target tracker.

    PubMed

    Cheng, Jianhua; Chen, Daidai; Sun, Xiangyu; Wang, Tongda

    2015-02-04

    To obtain the absolute position of a target is one of the basic topics for non-cooperated target tracking problems. In this paper, we present a simultaneously calibration method for an Inertial navigation system (INS)/Global position system (GPS)/Laser distance scanner (LDS) integrated system based target positioning approach. The INS/GPS integrated system provides the attitude and position of observer, and LDS offers the distance between the observer and the target. The two most significant errors are taken into jointly consideration and analyzed: (1) the attitude measure error of INS/GPS; (2) the installation error between INS/GPS and LDS subsystems. Consequently, a INS/GPS/LDS based target positioning approach considering these two errors is proposed. In order to improve the performance of this approach, a novel calibration method is designed to simultaneously estimate and compensate these two main errors. Finally, simulations are conducted to access the performance of the proposed target positioning approach and the designed simultaneously calibration method.

  15. Accuracy improvement in a calibration test bench for accelerometers by a vision system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D’Emilia, Giulio, E-mail: giulio.demilia@univaq.it; Di Gasbarro, David, E-mail: david.digasbarro@graduate.univaq.it; Gaspari, Antonella, E-mail: antonella.gaspari@graduate.univaq.it

    2016-06-28

    A procedure is described in this paper for the accuracy improvement of calibration of low-cost accelerometers in a prototype rotary test bench, driven by a brushless servo-motor and operating in a low frequency range of vibrations (0 to 5 Hz). Vibration measurements by a vision system based on a low frequency camera have been carried out, in order to reduce the uncertainty of the real acceleration evaluation at the installation point of the sensor to be calibrated. A preliminary test device has been realized and operated in order to evaluate the metrological performances of the vision system, showing a satisfactory behaviormore » if the uncertainty measurement is taken into account. A combination of suitable settings of the control parameters of the motion control system and of the information gained by the vision system allowed to fit the information about the reference acceleration at the installation point to the needs of the procedure for static and dynamic calibration of three-axis accelerometers.« less

  16. Calibration improvements to electronically scanned pressure systems and preliminary statistical assessment

    NASA Technical Reports Server (NTRS)

    Everhart, Joel L.

    1996-01-01

    Orifice-to-orifice inconsistencies in data acquired with an electronically-scanned pressure system at the beginning of a wind tunnel experiment forced modifications to the standard, instrument calibration procedures. These modifications included a large increase in the number of calibration points which would allow a critical examination of the calibration curve-fit process, and a subsequent post-test reduction of the pressure data. Evaluation of these data has resulted in an improved functional representation of the pressure-voltage signature for electronically-scanned pressures sensors, which can reduce the errors due to calibration curve fit to under 0.10 percent of reading compared to the manufacturer specified 0.10 percent of full scale. Application of the improved calibration function allows a more rational selection of the calibration set-point pressures. These pressures should be adjusted to achieve a voltage output which matches the physical shape of the pressure-voltage signature of the sensor. This process is conducted in lieu of the more traditional approach where a calibration pressure is specified and the resulting sensor voltage is recorded. The fifteen calibrations acquired over the two-week duration of the wind tunnel test were further used to perform a preliminary, statistical assessment of the variation in the calibration process. The results allowed the estimation of the bias uncertainty for a single instrument calibration; and, they form the precursor for more extensive and more controlled studies in the laboratory.

  17. MODIFICATIONS OF THE RAND REAC,

    DTIC Science & Technology

    The major items of the modification program were the installation of a removable plugboard of the type used on the International Business Machines punched card tabulators, and a digital readout device.

  18. KENNEDY SPACE CENTER, FLA. - Stephanie Stilson, NASA vehicle manager for Discovery, is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period, which included inspection, modifications and reservicing of most systems onboard Discovery, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

    NASA Image and Video Library

    2004-01-22

    KENNEDY SPACE CENTER, FLA. - Stephanie Stilson, NASA vehicle manager for Discovery, is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period, which included inspection, modifications and reservicing of most systems onboard Discovery, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

  19. 78 FR 17282 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... of Application for Approval of Discontinuance or Modification of a Railroad Signal System In... approval from the Federal Railroad Administration (FRA) for the discontinuance or modification of a signal... modifications that it will make to the signal system at the A&R crossing in preparation for the installation of...

  20. The photomultiplier tube calibration system of the MicroBooNE experiment

    DOE PAGES

    Conrad, J.; Jones, B. J. P.; Moss, Z.; ...

    2015-06-03

    Here, we report on the design and construction of a LED-based fiber calibration system for large liquid argon time projection detectors. This system was developed to calibrate the optical systems of the MicroBooNE experiment. As well as detailing the materials and installation procedure, we provide technical drawings and specifications so that the system may be easily replicated in future LArTPC detectors.

  1. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...

  2. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  3. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  4. 76 FR 81790 - Airworthiness Directives; Hawker Beechcraft Corporation Airplanes Equipped With a Certain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... modification that included installation of winglets and different engines and propellers) were installed. The... addition of winglets. (d) Subject Joint Aircraft System Component (JASC)/Air Transport Association (ATA) of...

  5. 10 CFR 74.59 - Quality assurance and accounting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... analyses and evaluations of the design, installation, preoperational tests, calibration, and operation of... performed at a pre-determined frequency, indicate a need for recalibration. Calibrations and tests must be... necessary for performance of the material control tests required by § 74.53(b). (e) Measurement control. The...

  6. 10 CFR 74.59 - Quality assurance and accounting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... analyses and evaluations of the design, installation, preoperational tests, calibration, and operation of... performed at a pre-determined frequency, indicate a need for recalibration. Calibrations and tests must be... necessary for performance of the material control tests required by § 74.53(b). (e) Measurement control. The...

  7. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assurance or control activities (including, as applicable, calibration checks and required zero and span... applicable, calibration checks and required zero and span adjustments) do not constitute monitoring... required zero and span adjustments), you must conduct all monitoring in continuous operation at all times...

  8. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assurance or control activities (including, as applicable, calibration checks and required zero and span... applicable, calibration checks and required zero and span adjustments) do not constitute monitoring... required zero and span adjustments), you must conduct all monitoring in continuous operation at all times...

  9. Investigating the influence on safety of retrofitting Italian motorways with barriers meeting a new EU standard.

    PubMed

    Cafiso, Salvatore; D'Agostino, Carmelo; Persaud, Bhagwant

    2017-04-03

    A new European Union (EU) regulation for safety barriers, which is based on performance, has encouraged road agencies to perform an upgrade of old barriers, with the expectation that there will be safety benefits at the retrofitted sites. The new class of barriers was designed and installed in compliance with the 1998 (European Norm) EN 1317 standards for road restraint systems, which lays down common requirements for the testing and certification of road restraint systems in all countries of the European Committee for Standardization (CEN). Both the older and new barriers are made of steel and are installed in such a way as to avoid vehicle intrusion, but the older ones are thought to be only effective at low speeds and large angles of impact. The new standard seeks to remedy this by providing better protection at higher speeds. This article seeks to quantify the effect on the frequency of fatal and injury crashes of retrofitting motorways with barriers meeting the new standards. The estimation of the crash modification was carried out by performing an empirical Bayes before-after analysis based on data from the A18 Messina-Catania motorway in Italy. The methodology has the great advantage to account for the regression to the mean effects. Besides, to account for time trend effects and dispersion of crash data, a modified calibration methodology of safety performance was used. This study, based on data collected on 76 km of motorway in the period 2000-2012, derived Crash Modification Factor point estimates that indicate reductions of 72% for run-off-road fatal and injury crashes and 38% in total fatal and injury crashes that could be expected by upgrading an old safety barrier by complying with new EU 1317 standards. The estimated benefit-cost ratio of 5.57 for total crashes indicates that the treatment is cost effective. The magnitude of this benefit indicates that the retrofits are cost-effective even for total crashes and should continue in any European country inasmuch as the estimated Crash Modification Factors are based on treatment sites that are reasonably representative of all European motorways.

  10. Endeavour lands atop 747 after downtime at Palmdale, CA

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Orbiter Endeavour arrives at KSCs Shuttle Landing Facility atop NASAs Boeing 747 Shuttle Carrier Aircraft (SCA) as it returns March 27, 1997 from Palmdale, Calif., after an eight-month Orbiter Maintenance Down Period (OMDP). Nearly 100 modifications were made to Endeavour during that time period, including some that were directly associated with work required to support International Space Station Operations. The most extensive of those was the installation of an external airlock to allow the orbiter to dock with the Station. Other modifications included upgrades to Endeavours power supply system, general purpose computers and thermal protection system, along with the installation of new light-weight commander and pilot seats and other weight-saving modifications.

  11. Modification, calibration, and performance of the Ultra-High Sensitivity Aerosol Spectrometer for particle size distribution and volatility measurements during the Atmospheric Tomography Mission (ATom) airborne campaign

    NASA Astrophysics Data System (ADS)

    Kupc, Agnieszka; Williamson, Christina; Wagner, Nicholas L.; Richardson, Mathews; Brock, Charles A.

    2018-01-01

    Atmospheric aerosol is a key component of the chemistry and climate of the Earth's atmosphere. Accurate measurement of the concentration of atmospheric particles as a function of their size is fundamental to investigations of particle microphysics, optical characteristics, and chemical processes. We describe the modification, calibration, and performance of two commercially available, Ultra-High Sensitivity Aerosol Spectrometers (UHSASs) as used on the NASA DC-8 aircraft during the Atmospheric Tomography Mission (ATom). To avoid sample flow issues related to pressure variations during aircraft altitude changes, we installed a laminar flow meter on each instrument to measure sample flow directly at the inlet as well as flow controllers to maintain constant volumetric sheath flows. In addition, we added a compact thermodenuder operating at 300 °C to the inlet line of one of the instruments. With these modifications, the instruments are capable of making accurate (ranging from 7 % for Dp < 0.07 µm to 1 % for Dp > 0.13 µm), precise (< ±1.2 %), and continuous (1 Hz) measurements of size-resolved particle number concentration over the diameter range of 0.063-1.0 µm at ambient pressures of > 1000 to 225 hPa, while simultaneously providing information on particle volatility.We assessed the effect of uncertainty in the refractive index (n) of ambient particles that are sized by the UHSAS assuming the refractive index of ammonium sulfate (n = 1.52). For calibration particles with n between 1.44 and 1.58, the UHSAS diameter varies by +4/-10 % relative to ammonium sulfate. This diameter uncertainty associated with the range of refractive indices (i.e., particle composition) translates to aerosol surface area and volume uncertainties of +8.4/-17.8 and +12.4/-27.5 %, respectively. In addition to sizing uncertainty, low counting statistics can lead to uncertainties of < 20 % for aerosol surface area and < 30 % for volume with 10 s time resolution. The UHSAS reduction in counting efficiency was corrected for concentrations > 1000 cm-3.Examples of thermodenuded and non-thermodenuded aerosol number and volume size distributions as well as propagated uncertainties are shown for several cases encountered during the ATom project. Uncertainties in particle number concentration were limited by counting statistics, especially in the tropical upper troposphere where accumulation-mode concentrations were sometimes < 20 cm-3 (counting rates ˜ 5 Hz) at standard temperature and pressure.

  12. Microwave Interferometry (90 GHz) for Hall Thruster Plume Density Characterization

    DTIC Science & Technology

    2005-06-01

    Hall thruster . The interferometer has been modified to overcome initial difficulties encountered during the preliminary testing. The modifications include the ability to perform remote and automated calibrations as well as an aluminum enclosure to shield the interferometer from the Hall thruster plume. With these modifications, it will be possible to make unambiguous electron density measurements of the thruster plume as well as to rapidly and automatically calibrate the interferometer to eliminate the effects of signal drift. Due to the versatility

  13. Aero-Thermal Calibration of the NASA Glenn Icing Research Tunnel (2012 Tests)

    NASA Technical Reports Server (NTRS)

    Pastor-Barsi, Christine; Allen, Arrington E.

    2013-01-01

    A full aero-thermal calibration of the NASA Glenn Icing Research Tunnel (IRT) was completed in 2012 following the major modifications to the facility that included replacement of the refrigeration plant and heat exchanger. The calibration test provided data used to fully document the aero-thermal flow quality in the IRT test section and to construct calibration curves for the operation of the IRT.

  14. A procedure for accurate calibration of the orientation of the three sensors in a vector magnetometer. [at the Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Mcpherron, R. L.

    1977-01-01

    Procedures are described for the calibration of a vector magnetometer of high absolute accuracy. It is assumed that the calibration will be performed in the magnetic test facility of Goddard Space Flight Center (GSFC). The first main section of the report describes the test equipment and facility calibrations required. The second presents procedures for calibrating individual sensors. The third discusses the calibration of the sensor assembly. In a final section recommendations are made to GSFC for modification of the test facility required to carry out the calibration procedures.

  15. Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) onboard calibration system

    NASA Technical Reports Server (NTRS)

    Chrien, Thomas G.; Eastwood, Mike; Green, Robert O.; Sarture, Charles; Johnson, Howell; Chovit, Chris; Hajek, Pavel

    1995-01-01

    The AVIRIS instrument uses an onboard calibration system to provide auxiliary calibration data. The system consist of a tungsten halogen cycle lamp imaged onto a fiber bundle through an eight position filter wheel. The fiber bundle illuminates the back side of the foreoptics shutter during a pre-run and post-run calibration sequence. The filter wheel contains two neutral density filters, five spectral filters and one blocked position. This paper reviews the general workings of the onboard calibrator system and discusses recent modifications.

  16. Traceable calibration of photovoltaic reference cells using natural sunlight

    NASA Astrophysics Data System (ADS)

    Müllejans, H.; Zaaiman, W.; Pavanello, D.; Dunlop, E. D.

    2018-02-01

    At the European Solar Test Installation (ESTI) photovoltaic (PV) reference cells are calibrated traceably to SI units via the World Radiometric Reference (WRR) using natural sunlight. The Direct Sunlight Method (DSM) is described in detail and the latest measurement results and an updated uncertainty budget are reported. These PV reference cells then provide a practical means for measuring the irradiance of natural or simulated sunlight during the calibration of other PV devices.

  17. The preliminary checkout, evaluation and calibration of a 3-component force measurement system for calibrating propulsion simulators for wind tunnel models

    NASA Technical Reports Server (NTRS)

    Scott, W. A.

    1984-01-01

    The propulsion simulator calibration laboratory (PSCL) in which calibrations can be performed to determine the gross thrust and airflow of propulsion simulators installed in wind tunnel models is described. The preliminary checkout, evaluation and calibration of the PSCL's 3 component force measurement system is reported. Methods and equipment were developed for the alignment and calibration of the force measurement system. The initial alignment of the system demonstrated the need for more efficient means of aligning system's components. The use of precision alignment jigs increases both the speed and accuracy with which the system is aligned. The calibration of the force measurement system shows that the methods and equipment for this procedure can be successful.

  18. Performance evaluation of radiant cooling system application on a university building in Indonesia

    NASA Astrophysics Data System (ADS)

    Satrio, Pujo; Sholahudin, S.; Nasruddin

    2017-03-01

    The paper describes a study developed to estimate the energy savings potential of a radiant cooling system installed in an institutional building in Indonesia. The simulations were carried out using IESVE to evaluate thermal performance and energy consumption The building model was calibrated using the measured data for the installed radiant system. Then this calibrated model was used to simulate the energy consumption and temperature distribution to determine the proportional energy savings and occupant comfort under different systems. The result was radiant cooling which integrated with a Dedicated Outside Air System (DOAS) could make 41,84% energy savings compared to the installed cooling system. The Computational Fluid Dynamics (CFD) simulation showed that a radiant system integrated with DOAS provides superior human comfort than a radiant system integrated with Variable Air Volume (VAV). Percentage People Dissatisfied was kept below 10% using the proposed system.

  19. KSC-03pd0262

    NASA Image and Video Library

    2003-02-04

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) technicians install thermal protection system tiles on Space Shuttle Discovery. Discovery is undergoing its Orbiter Major Modification Period, a regularly scheduled structural inspection and modification downtime, which began in September 2002. .

  20. 77 FR 12991 - Airworthiness Directives; Hawker Beechcraft Corporation Airplanes Equipped With a Certain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... (Foxstar Baron modification of winglets and different engines and propellers) were installed.'' to read ``, we found that STC SA1762SO (Foxstar Baron modification of winglets and different engines and...

  1. Site-selective protein-modification chemistry for basic biology and drug development

    NASA Astrophysics Data System (ADS)

    Krall, Nikolaus; da Cruz, Filipa P.; Boutureira, Omar; Bernardes, Gonçalo J. L.

    2016-02-01

    Nature has produced intricate machinery to covalently diversify the structure of proteins after their synthesis in the ribosome. In an attempt to mimic nature, chemists have developed a large set of reactions that enable post-expression modification of proteins at pre-determined sites. These reactions are now used to selectively install particular modifications on proteins for many biological and therapeutic applications. For example, they provide an opportunity to install post-translational modifications on proteins to determine their exact biological roles. Labelling of proteins in live cells with fluorescent dyes allows protein uptake and intracellular trafficking to be tracked and also enables physiological parameters to be measured optically. Through the conjugation of potent cytotoxicants to antibodies, novel anti-cancer drugs with improved efficacy and reduced side effects may be obtained. In this Perspective, we highlight the most exciting current and future applications of chemical site-selective protein modification and consider which hurdles still need to be overcome for more widespread use.

  2. Site-selective protein-modification chemistry for basic biology and drug development.

    PubMed

    Krall, Nikolaus; da Cruz, Filipa P; Boutureira, Omar; Bernardes, Gonçalo J L

    2016-02-01

    Nature has produced intricate machinery to covalently diversify the structure of proteins after their synthesis in the ribosome. In an attempt to mimic nature, chemists have developed a large set of reactions that enable post-expression modification of proteins at pre-determined sites. These reactions are now used to selectively install particular modifications on proteins for many biological and therapeutic applications. For example, they provide an opportunity to install post-translational modifications on proteins to determine their exact biological roles. Labelling of proteins in live cells with fluorescent dyes allows protein uptake and intracellular trafficking to be tracked and also enables physiological parameters to be measured optically. Through the conjugation of potent cytotoxicants to antibodies, novel anti-cancer drugs with improved efficacy and reduced side effects may be obtained. In this Perspective, we highlight the most exciting current and future applications of chemical site-selective protein modification and consider which hurdles still need to be overcome for more widespread use.

  3. Insert Modifications Improve Access to Artificial Red-Cockaded Woodpecker Next Cavities

    Treesearch

    John W. Edwards; Ernest E. Stevens; Charles A. Dachelet

    1997-01-01

    A designfor a modified, artificial Red-cockaded Woodpecker(Picoides borealis) cavity insert is presented. This modification allowed eggs and young to be inspected easily, removed, and replaced throughout the nesting period. Modifications to cavity inserts are best done before installation, but can be easily retrofitted in existing artificial cavities...

  4. 78 FR 9106 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-07

    ... of Application for Approval of Discontinuance or Modification of a Railroad Signal System In... modification of a signal system. FRA assigned the petition Docket Number FRA-2012-0099. Applicant: Norfolk...-throw switch. NS seeks to make these proposed changes to modernize its signal equipment and install...

  5. 40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each pH measurement device, you must meet the... integrity and all electrical connections for continuity. (e) For each bag leak detection system, you must... leak detection system must be installed, calibrated, operated, and maintained according to the “Fabric...

  6. Field and laboratory calibration of impact plates for measuring coarse bed load transport

    USDA-ARS?s Scientific Manuscript database

    During 2008-2009, an array of impact plates instrumented with either accelerometers or geophones was installed over a channel spanning weir in the Elwha River in Washington, USA. The impact system is the first permanent installation of its kind in North America. The system was deployed to measure th...

  7. 40 CFR 61.126 - Monitoring of operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operator of any source subject to this subpart using a wet-scrubbing emission control device shall install... manufacturer to be accurate within ±250 pascal (±1 inch of water). The owner or operator of any source subject to this subpart using a wet-scrubbing emission control device shall also install, calibrate, maintain...

  8. 40 CFR 61.126 - Monitoring of operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operator of any source subject to this subpart using a wet-scrubbing emission control device shall install... manufacturer to be accurate within ±250 pascal (±1 inch of water). The owner or operator of any source subject to this subpart using a wet-scrubbing emission control device shall also install, calibrate, maintain...

  9. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring system for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  10. 40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring systems for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  11. 40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring systems for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  12. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring system for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  13. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...

  14. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...

  15. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...

  16. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...

  17. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...

  18. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...

  19. Scaling and calibration of a core validation site for the soil moisture active passive mission

    USDA-ARS?s Scientific Manuscript database

    The calibration and validation of soil moisture remote sensing products is complicated due to the logistics of installing a long term soil moisture monitoring network in an active landscape. It is more efficient to locate these stations along agricultural field boundaries, but unfortunately this oft...

  20. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... accuracy that is traceable to National Institute of Standards and Technology (NIST) standards. (ii) The... section. (i) Perform a single-point calibration using an NIST-certified buffer solution that is accurate... include a redundant pH sensor, perform a single point calibration using an NIST-certified buffer solution...

  1. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accuracy that is traceable to National Institute of Standards and Technology (NIST) standards. (ii) The... section. (i) Perform a single-point calibration using an NIST-certified buffer solution that is accurate... include a redundant pH sensor, perform a single point calibration using an NIST-certified buffer solution...

  2. Accuracy of airspeed measurements and flight calibration procedures

    NASA Technical Reports Server (NTRS)

    Huston, Wilber B

    1948-01-01

    The sources of error that may enter into the measurement of airspeed by pitot-static methods are reviewed in detail together with methods of flight calibration of airspeed installations. Special attention is given to the problem of accurate measurements of airspeed under conditions of high speed and maneuverability required of military airplanes. (author)

  3. Gas-driven pump for ground-water samples

    USGS Publications Warehouse

    Signor, Donald C.

    1978-01-01

    Observation wells installed for artificial-recharge research and other wells used in different ground-water programs are frequently cased with small-diameter steel pipe. To obtain samples from these small-diameter wells in order to monitor water quality, and to calibrate solute-transport models, a small-diameter pump with unique operating characteristics is required that causes a minimum alternation of samples during field sampling. A small-diameter gas-driven pump was designed and built to obtain water samples from wells of two-inch diameter or larger. The pump is a double-piston type with the following characteristics: (1) The water sample is isolated from the operating gas, (2) no source of electricity is ncessary, (3) operation is continuous, (4) use of compressed gas is efficient, and (5) operation is reliable over extended periods of time. Principles of operation, actual operation techniques, gas-use analyses and operating experience are described. Complete working drawings and a component list are included. Recent modifications and pump construction for high-pressure applications also are described. (Woodard-USGS)

  4. An experiment in big data: storage, querying and visualisation of data taken from the Liverpool Telescope's wide field cameras

    NASA Astrophysics Data System (ADS)

    Barnsley, R. M.; Steele, Iain A.; Smith, R. J.; Mawson, Neil R.

    2014-07-01

    The Small Telescopes Installed at the Liverpool Telescope (STILT) project has been in operation since March 2009, collecting data with three wide field unfiltered cameras: SkycamA, SkycamT and SkycamZ. To process the data, a pipeline was developed to automate source extraction, catalogue cross-matching, photometric calibration and database storage. In this paper, modifications and further developments to this pipeline will be discussed, including a complete refactor of the pipeline's codebase into Python, migration of the back-end database technology from MySQL to PostgreSQL, and changing the catalogue used for source cross-matching from USNO-B1 to APASS. In addition to this, details will be given relating to the development of a preliminary front-end to the source extracted database which will allow a user to perform common queries such as cone searches and light curve comparisons of catalogue and non-catalogue matched objects. Some next steps and future ideas for the project will also be presented.

  5. Experiment Automation with a Robot Arm using the Liquids Reflectometer Instrument at the Spallation Neutron Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zolnierczuk, Piotr A; Vacaliuc, Bogdan; Sundaram, Madhan

    The Liquids Reflectometer instrument installed at the Spallation Neutron Source (SNS) enables observations of chemical kinetics, solid-state reactions and phase-transitions of thin film materials at both solid and liquid surfaces. Effective measurement of these behaviors requires each sample to be calibrated dynamically using the neutron beam and the data acquisition system in a feedback loop. Since the SNS is an intense neutron source, the time needed to perform the measurement can be the same as the alignment process, leading to a labor-intensive operation that is exhausting to users. An update to the instrument control system, completed in March 2013, implementedmore » the key features of automated sample alignment and robot-driven sample management, allowing for unattended operation over extended periods, lasting as long as 20 hours. We present a case study of the effort, detailing the mechanical, electrical and software modifications that were made as well as the lessons learned during the integration, verification and testing process.« less

  6. Vegetation and other development options for mitigating urban air pollution impacts

    EPA Science Inventory

    In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...

  7. Calibration of the Langley 16-foot transonic tunnel with test section air removal

    NASA Technical Reports Server (NTRS)

    Corson, B. W., Jr.; Runckel, J. F.; Igoe, W. B.

    1974-01-01

    The Langley 16-foot transonic tunnel with test section air removal (plenum suction) was calibrated to a Mach number of 1.3. The results of the calibration, including the effects of slot shape modifications, test section wall divergence, and water vapor condensation, are presented. A complete description of the wind tunnel and its auxiliary equipment is included.

  8. Aero-Thermal Calibration of the NASA Glenn Icing Research Tunnel (2012 Test)

    NASA Technical Reports Server (NTRS)

    Pastor-Barsi, Christine M.; Arrington, E. Allen; VanZante, Judith Foss

    2012-01-01

    A major modification of the refrigeration plant and heat exchanger at the NASA Glenn Icing Research Tunnel (IRT) occurred in autumn of 2011. It is standard practice at NASA Glenn to perform a full aero-thermal calibration of the test section of a wind tunnel facility upon completion of major modifications. This paper will discuss the tools and techniques used to complete an aero-thermal calibration of the IRT and the results that were acquired. The goal of this test entry was to complete a flow quality survey and aero-thermal calibration measurements in the test section of the IRT. Test hardware that was used includes the 2D Resistive Temperature Detector (RTD) array, 9-ft pressure survey rake, hot wire survey rake, and the quick check survey rake. This test hardware provides a map of the velocity, Mach number, total and static pressure, total temperature, flow angle and turbulence intensity. The data acquired were then reduced to examine pressure, temperature, velocity, flow angle, and turbulence intensity. Reduced data has been evaluated to assess how the facility meets flow quality goals. No icing conditions were tested as part of the aero-thermal calibration. However, the effects of the spray bar air injections on the flow quality and aero-thermal calibration measurements were examined as part of this calibration.

  9. A New Approach to the Internal Calibration of Reverberation-Mapping Spectra

    NASA Astrophysics Data System (ADS)

    Fausnaugh, M. M.

    2017-02-01

    We present a new procedure for the internal (night-to-night) calibration of timeseries spectra, with specific applications to optical AGN reverberation mapping data. The traditional calibration technique assumes that the narrow [O iii] λ5007 emission-line profile is constant in time; given a reference [O iii] λ5007 line profile, nightly spectra are aligned by fitting for a wavelength shift, a flux rescaling factor, and a change in the spectroscopic resolution. We propose the following modifications to this procedure: (1) we stipulate a constant spectral resolution for the final calibrated spectra, (2) we employ a more flexible model for changes in the spectral resolution, and (3) we use a Bayesian modeling framework to assess uncertainties in the calibration. In a test case using data for MCG+08-11-011, these modifications result in a calibration precision of ˜1 millimagnitude, which is approximately a factor of five improvement over the traditional technique. At this level, other systematic issues (e.g., the nightly sensitivity functions and Feii contamination) limit the final precision of the observed light curves. We implement this procedure as a python package (mapspec), which we make available to the community.

  10. Automated Heat-Flux-Calibration Facility

    NASA Technical Reports Server (NTRS)

    Liebert, Curt H.; Weikle, Donald H.

    1989-01-01

    Computer control speeds operation of equipment and processing of measurements. New heat-flux-calibration facility developed at Lewis Research Center. Used for fast-transient heat-transfer testing, durability testing, and calibration of heat-flux gauges. Calibrations performed at constant or transient heat fluxes ranging from 1 to 6 MW/m2 and at temperatures ranging from 80 K to melting temperatures of most materials. Facility developed because there is need to build and calibrate very-small heat-flux gauges for Space Shuttle main engine (SSME).Includes lamp head attached to side of service module, an argon-gas-recirculation module, reflector, heat exchanger, and high-speed positioning system. This type of automated heat-flux calibration facility installed in industrial plants for onsite calibration of heat-flux gauges measuring fluxes of heat in advanced gas-turbine and rocket engines.

  11. Multimodal Spatial Calibration for Accurately Registering EEG Sensor Positions

    PubMed Central

    Chen, Shengyong; Xiao, Gang; Li, Xiaoli

    2014-01-01

    This paper proposes a fast and accurate calibration method to calibrate multiple multimodal sensors using a novel photogrammetry system for fast localization of EEG sensors. The EEG sensors are placed on human head and multimodal sensors are installed around the head to simultaneously obtain all EEG sensor positions. A multiple views' calibration process is implemented to obtain the transformations of multiple views. We first develop an efficient local repair algorithm to improve the depth map, and then a special calibration body is designed. Based on them, accurate and robust calibration results can be achieved. We evaluate the proposed method by corners of a chessboard calibration plate. Experimental results demonstrate that the proposed method can achieve good performance, which can be further applied to EEG source localization applications on human brain. PMID:24803954

  12. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as... detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be... specifications and recommendations. (3) The bag leak detection system must be certified by the manufacturer to be...

  13. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tolerance of 1.27 centimeters of water or a transducer with a minimum tolerance of 1 percent of the pressure... use a fabric filter bag leak detection system to comply with the requirements of this subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as specified in...

  14. 40 CFR 60.1760 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... opacity monitoring system and how are the data used? 60.1760 Section 60.1760 Protection of Environment... continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each continuous opacity...

  15. 40 CFR 62.15215 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... opacity monitoring system and how are the data used? 62.15215 Section 62.15215 Protection of Environment... required for my continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each...

  16. Calibration of HST wide field camera for quantitative analysis of faint galaxy images

    NASA Technical Reports Server (NTRS)

    Ratnatunga, Kavan U.; Griffiths, Richard E.; Casertano, Stefano; Neuschaefer, Lyman W.; Wyckoff, Eric W.

    1994-01-01

    We present the methods adopted to optimize the calibration of images obtained with the Hubble Space Telescope (HST) Wide Field Camera (WFC) (1991-1993). Our main goal is to improve quantitative measurement of faint images, with special emphasis on the faint (I approximately 20-24 mag) stars and galaxies observed as a part of the Medium-Deep Survey. Several modifications to the standard calibration procedures have been introduced, including improved bias and dark images, and a new supersky flatfield obtained by combining a large number of relatively object-free Medium-Deep Survey exposures of random fields. The supersky flat has a pixel-to-pixel rms error of about 2.0% in F555W and of 2.4% in F785LP; large-scale variations are smaller than 1% rms. Overall, our modifications improve the quality of faint images with respect to the standard calibration by about a factor of five in photometric accuracy and about 0.3 mag in sensitivity, corresponding to about a factor of two in observing time. The relevant calibration images have been made available to the scientific community.

  17. Calibration of highway safety manual work zone crash modification factors.

    DOT National Transportation Integrated Search

    2014-06-01

    The Highway Safety Manual is the national safety manual that provides quantitative methods for analyzing highway safety. The : HSM presents crash modification factors related to work zone characteristics such as work zone duration and length. These c...

  18. Measurement of the Coolant Channel Temperatures and Pressures of a Cooled Radial-Inflow Turbine

    NASA Technical Reports Server (NTRS)

    Dicicco, L. Danielle; Nowlin, Brent C.; Tirres, Lizet

    1994-01-01

    Instrumentation has been installed on the surface of a cooled radial-inflow turbine. Thermocouples and miniature integrated sensor pressure transducers were installed to measure steady state coolant temperatures, blade wall temperatures, and coolant pressures. These measurements will eventually be used to determine the heat transfer characteristics of the rotor. This paper will describe the procedures used to install and calibrate the instrumentation and the testing methods followed. A limited amount of data will compare the measured values to the predicted values.

  19. Improvements to the Total Temperature Calibration of the NASA Glenn Icing Research Tunnel

    NASA Technical Reports Server (NTRS)

    Arrington, E. Allen; Gonsalez, Jose C.

    2005-01-01

    The ability to accurately set repeatable total temperature conditions is critical for collecting quality icing condition data, particularly near freezing conditions. As part of efforts to continually improve data quality in the NASA Glenn Icing Research Tunnel (IRT), new facility instrumentation and new calibration hardware for total temperature measurement were installed and new operational techniques were developed and implemented. This paper focuses on the improvements made in the calibration of total temperature in the IRT.

  20. Calibration of Fast Fiber-Optic Beam Loss Monitors for the Advanced Photon Source Storage Ring Superconducting Undulators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dooling, J.; Harkay, K.; Ivanyushenkov, Y.

    2015-01-01

    We report on the calibration and use of fast fiber-optic (FO) beam loss monitors (BLMs) in the Advanced Photon Source storage ring (SR). A superconducting undulator prototype (SCU0) has been operating in SR Sector 6 (“ID6”) since the beginning of CY2013, and another undulator SCU1 (a 1.1-m length undulator that is three times the length of SCU0) is scheduled for installation in Sector 1 (“ID1”) in 2015. The SCU0 main coil often quenches during beam dumps. MARS simulations have shown that relatively small beam loss (<1 nC) can lead to temperature excursions sufficient to cause quenchingwhen the SCU0windings are nearmore » critical current. To characterize local beam losses, high-purity fused-silica FO cables were installed in ID6 on the SCU0 chamber transitions and in ID1 where SCU1 will be installed. These BLMs aid in the search for operating modes that protect the SCU structures from beam-loss-induced quenching. In this paper, we describe the BLM calibration process that included deliberate beam dumps at locations of BLMs. We also compare beam dump events where SCU0 did and did not quench.« less

  1. A methodology to evaluate occupational internal exposure to fluorine-18.

    PubMed

    Oliveira, C M; Dantas, A L A; Dantas, B M

    2009-11-15

    The objective of this work is to develop procedures for internal monitoring of (18)F to be applied in cases of possible incorporation of fluoride and (18)FDG, using in vivo and in vitro methods of measurements. The Na I (Tl) 8" x 4" scintillation detector installed at IRD-Whole Body Counter was calibrated for measurements with a whole body anthropomorphic phantom, simulating homogeneous distribution of (18)F in the body. The NaI(Tl) 3"x 3" scintillation detector installed at the IRD-Whole Body Counter was calibrated for in vivo measurements with a brain phantom inserted in an artificial skull, simulating (18)FDG incorporation. The HPGe detection system installed at the IRD-Bioassay Laboratory was calibrated for in vitro measurements of urine samples with 1 liter plastic bottles containing a standard liquid source. A methodology for bioassay data interpretation, based on standard ICRP models edited with the software AIDE-version 6, was established. It is concluded that in vivo measurements have sufficient sensitivity for monitoring (18)F in the forms of fluoride and (18)FDG. The use of both in vitro and in vivo bioassay data can provide useful information for the interpretation of bioassay data in cases of accidental incorporation in order to identify the chemical form of (18)F incorporated.

  2. Electromagnetic diagnostic system for the Keda Torus eXperiment

    NASA Astrophysics Data System (ADS)

    Tu, Cui; Liu, Adi; Li, Zichao; Tan, Mingsheng; Luo, Bing; You, Wei; Li, Chenguang; Bai, Wei; Fu, Chenshuo; Huang, Fangcheng; Xiao, Bingjia; Shen, Biao; Shi, Tonghui; Chen, Dalong; Mao, Wenzhe; Li, Hong; Xie, Jinglin; Lan, Tao; Ding, Weixing; Xiao, Chijin; Liu, Wandong

    2017-09-01

    A system for electromagnetic measurements was designed and installed on the Keda Torus eXperiment (KTX) reversed field pinch device last year. Although the unique double-C structure of the KTX, which allows the machine to be opened easily without disassembling the poloidal field windings, makes the convenient replacement and modification of the internal inductive coils possible, it can present difficulties in the design of flux coils and magnetic probes at the two vertical gaps. Moreover, the KTX has a composite shell consisting of a 6 mm stainless steel vacuum chamber and a 1.5 mm copper shell, which results in limited space for the installation of saddle sensors. Therefore, the double-C structure and composite shell should be considered, especially during the design and installation of the electromagnetic diagnostic system (EDS). The inner surface of the vacuum vessel includes two types of probes. One type is for the measurement of the global plasma parameters, and the other type is for studying the local behavior of the plasma and operating the new saddle coils. In addition, the probes on the outer surface of the composite shell are used for measurements of eddy currents. Finally, saddle sensors for radial field measurements for feedback control were installed between the conducting shell and the vacuum vessel. The entire system includes approximately 1100 magnetic probes, 14 flux coils, 4 ×26 ×2 saddle sensors, and 16 Rogowski coils. Considering the large number of probes and limited space available in the vacuum vessel, the miniaturization of the probes and optimization of the probe distribution are necessary. In addition, accurate calibration and careful mounting of the probes are also required. The frequency response of the designed magnetic probes is up to 200 kHz, and the resolution is 1 G. The EDS, being spherical and of high precision, is one of the most basic and effective diagnostic tools of the KTX and meets the demands imposed by requirements on basic machine operating information and future studies.

  3. NASA Glenn Icing Research Tunnel: Upgrade and Cloud Calibration

    NASA Technical Reports Server (NTRS)

    VanZante, Judith Foss; Ide, Robert F.; Steen, Laura E.

    2012-01-01

    In 2011, NASA Glenn s Icing Research Tunnel underwent a major modification to it s refrigeration plant and heat exchanger. This paper presents the results of the subsequent full cloud calibration. Details of the calibration procedure and results are presented herein. The steps include developing a nozzle transfer map, establishing a uniform cloud, conducting a drop sizing calibration and finally a liquid water content calibration. The goal of the calibration is to develop a uniform cloud, and to build a transfer map from the inputs of air speed, spray bar atomizing air pressure and water pressure to the output of median volumetric droplet diameter and liquid water content.

  4. NASA Glenn Icing Research Tunnel: 2012 Cloud Calibration Procedure and Results

    NASA Technical Reports Server (NTRS)

    VanZante, Judith Foss; Ide, Robert F.; Steen, Laura E.

    2012-01-01

    In 2011, NASA Glenn s Icing Research Tunnel underwent a major modification to it s refrigeration plant and heat exchanger. This paper presents the results of the subsequent full cloud calibration. Details of the calibration procedure and results are presented herein. The steps include developing a nozzle transfer map, establishing a uniform cloud, conducting a drop sizing calibration and finally a liquid water content calibration. The goal of the calibration is to develop a uniform cloud, and to build a transfer map from the inputs of air speed, spray bar atomizing air pressure and water pressure to the output of median volumetric droplet diameter and liquid water content.

  5. Mobile Laser Doppler System Checkout and Calibration : Volume 1. Text

    DOT National Transportation Integrated Search

    1977-06-01

    A program has been carried out to make modifications to the Lockheed-Huntsville Mobiel Laser Doppler Velocimeter(LDV)system; to calibrate and operate the system at the John F. Kennedy (JFK) Airport; to obtain a data base of wind, wind shear, and wake...

  6. Mobile Laser Doppler System Checkout and Calibration : Volume 2. Appendixes.

    DOT National Transportation Integrated Search

    1977-06-01

    A program has been carried out to make modifications to the Lockheed-Huntsville Mobiel Laser Doppler Velocimeter(LDV)system; to calibrate and operate the system at the John F. Kennedy (JFK) Airport; to obtain a data base of wind, wind shear, and wake...

  7. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  8. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  9. Development of an Onboard Strain Recorder

    DTIC Science & Technology

    1990-01-01

    Investigations ...................... .910 2-3 Strain Sensors of Previous Investigations ..................... 11 2-4 Signal Conditioning of Previous...the time the strain sensor is installed or calibrated. If a maximum stress or force is to be determined, careful structural analysis is required to...such as deckhouse edges have been instrumented as cracks appear. Extreme care concerning placement and orientation of sensor installation is required

  10. Flumes, historic water yield and climatological data for Tenderfoot Creek Experimental Forest, Montana

    Treesearch

    Phillip E. Farnes; Ward W. McCaughey; Katherine J. Hansen

    1999-01-01

    The objectives of this Research Joint Venture Agreement (RJVA) were to install and calibrate three flumes on Tenderfoot Creek Experimental Forest (TCEF) in central Montana; check calibration of the existing seven flumes on TCEF; estimate the influence of fire on water yields over the 400-year fire history period; and estimate back records of monthly temperature,...

  11. Test of prototype ITER vacuum ultraviolet spectrometer and its application to impurity study in KSTAR plasmas.

    PubMed

    Seon, C R; Hong, J H; Jang, J; Lee, S H; Choe, W; Lee, H H; Cheon, M S; Pak, S; Lee, H G; Biel, W; Barnsley, R

    2014-11-01

    To optimize the design of ITER vacuum ultraviolet (VUV) spectrometer, a prototype VUV spectrometer was developed. The sensitivity calibration curve of the spectrometer was calculated from the mirror reflectivity, the grating efficiency, and the detector efficiency. The calibration curve was consistent with the calibration points derived in the experiment using the calibrated hollow cathode lamp. For the application of the prototype ITER VUV spectrometer, the prototype spectrometer was installed at KSTAR, and various impurity emission lines could be measured. By analyzing about 100 shots, strong positive correlation between the O VI and the C IV emission intensities could be found.

  12. KENNEDY SPACE CENTER, FLA. - NASA Vehicle Manager for Discovery, Stephanie Stilson poses for a photo after working with a KSC Web team who were filming a special feature for the KSC Web. Stilson explained her role in the recent Orbiter Major Modification period, which included inspection, modifications and reservicing of most systems onboard. The work on Discovery also included the installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

    NASA Image and Video Library

    2004-01-22

    KENNEDY SPACE CENTER, FLA. - NASA Vehicle Manager for Discovery, Stephanie Stilson poses for a photo after working with a KSC Web team who were filming a special feature for the KSC Web. Stilson explained her role in the recent Orbiter Major Modification period, which included inspection, modifications and reservicing of most systems onboard. The work on Discovery also included the installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

  13. KENNEDY SPACE CENTER, FLA. - Standing on a workstand (at left) in the Orbiter Processing Facility is Stephanie Stilson, NASA vehicle manager for Discovery. She is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period on Discovery, which included inspection, modifications and reservicing of most systems onboard, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

    NASA Image and Video Library

    2004-01-22

    KENNEDY SPACE CENTER, FLA. - Standing on a workstand (at left) in the Orbiter Processing Facility is Stephanie Stilson, NASA vehicle manager for Discovery. She is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period on Discovery, which included inspection, modifications and reservicing of most systems onboard, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

  14. KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Stephanie Stilson, NASA vehicle manager for Discovery, stands in front of a leading edge on the wing of Discovery. She is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period on Discovery, which included inspection, modifications and reservicing of most systems onboard, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

    NASA Image and Video Library

    2004-01-22

    KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, Stephanie Stilson, NASA vehicle manager for Discovery, stands in front of a leading edge on the wing of Discovery. She is being filmed for a special feature on the KSC Web about the recent Orbiter Major Modification period on Discovery, which included inspection, modifications and reservicing of most systems onboard, plus installation of a Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.” The orbiter is now being prepared for eventual launch on a future mission.

  15. 77 FR 49710 - Airworthiness Directives; Sikorsky Aircraft Corporation Helicopters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... modifications, installation of a warning relay by following Sikorsky Customer Service Bulletin No. 76- 66-10B... helicopter. Related Service Information We have reviewed the following documents from Sikorsky: Customer... specifies installing an ERB warning relay kit; Customer Service Notice No. 76-113, dated June 1, 1983, which...

  16. 45 CFR 307.30 - Federal financial participation at the 90 percent rate for statewide computerized support...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... planning, design, development, installation or enhancement of a computerized support enforcement system as... APD approved by the Office; and (6) The State or local government has ownership rights in software, software modifications and associated documentation that is designed, developed, installed, or enhanced...

  17. 76 FR 9984 - Airworthiness Directives; B/E Aerospace, Continuous Flow Passenger Oxygen Mask Assembly, Part...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ..., Continuous Flow Passenger Oxygen Mask Assembly, Part Numbers 174006-(), 174080-(), 174085-(), 174095... manufacturer and part number of the oxygen mask assemblies installed, an inspection to determine the manufacturing date and modification status if certain oxygen mask assemblies are installed, and corrective...

  18. 77 FR 15291 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... wiring conduit and the wing bottom skin. This proposed AD would require modifying the wiring installation... modification of the wiring installation to improve the routing and the protection of the harnesses in the zone... wiring conduit and the wing bottom skin. This condition, in the scope of published FAA SFAR88 [Special...

  19. 77 FR 47273 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... the autopilot electrical wiring conduit and the wing bottom skin. This AD requires modifying the wiring installation on the right-hand wing. We are issuing this AD to prevent sparking due to electrical... above, this [EASA] AD requires modification of the wiring installation to improve the routing and the...

  20. A Save-Energy, Save-Money Program That Pays Off

    ERIC Educational Resources Information Center

    Embersits, John F.

    1976-01-01

    Suggested guidelines for energy saving on campus include a 3-phase plan: (1) Quick Fix--effective management of what you already have; (2) Refitting--modification of existing systems and installation of simple controls; (3) Systems Convert--installation of computerized controls, waste-heat recovery, solid-waste recovery utilization and other…

  1. Naval Submarine Medical Research Laboratory Command History, OPNAV 5750-1 Fiscal Year 2005

    DTIC Science & Technology

    2006-09-26

    over peak calibration. TEOAE Reliability: Various Stimuli Measured on the Mimosa Acoustics System, With Comparisons to the Old Otodynamics ILO...Modifications Specified Modifications to the Mimosa Acoustics were specified. These included (a) completing the porting of the SFOAE and TEOAE

  2. TREAT Neutronics Analysis and Design Support, Part II: Multi-SERTTA-CAL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bess, John D.; Woolstenhulme, Nicolas E.; Hill, Connie M.

    2016-08-01

    Experiment vehicle design is necessary in preparation for Transient Reactor Test (TREAT) facility restart and the resumption of transient testing to support Accident Tolerant Fuel (ATF) characterization and other future fuels testing requirements. Currently the most mature vehicle design is the Multi-SERTTA (Static Environments Rodlet Transient Test Apparatuses), which can accommodate up to four concurrent rodlet-sized specimens under separate environmental conditions. Robust test vehicle design requires neutronics analyses to support design development, optimization of the power coupling factor (PCF) to efficiently maximize energy generation in the test fuel rodlets, and experiment safety analyses. In integral aspect of prior TREAT transientmore » testing was the incorporation of calibration experiments to experimentally evaluate and validate test conditions in preparation of the actual fuel testing. The calibration experiment package established the test parameter conditions to support fine-tuning of the computational models to deliver the required energy deposition to the fuel samples. The calibration vehicle was designed to be as near neutronically equivalent to the experiment vehicle as possible to minimize errors between the calibration and final tests. The Multi-SERTTA-CAL vehicle was designed to serve as the calibration vehicle supporting Multi-SERTTA experimentation. Models of the Multi-SERTTA-CAL vehicle containing typical PWR-fuel rodlets were prepared and neutronics calculations were performed using MCNP6.1 with ENDF/B-VII.1 nuclear data libraries; these results were then compared against those performed for Multi-SERTTA to determine the similarity and possible design modification necessary prior to construction of these experiment vehicles. The estimated reactivity insertion worth into the TREAT core is very similar between the two vehicle designs, with the primary physical difference being a hollow Inconel tube running down the length of the calibration vehicle. Calculations of PCF indicate that on average there is a reduction of approximately 6.3 and 12.6%, respectively, for PWR fuel rodlets irradiated under wet and dry conditions. Changes to the primary or secondary vessel structure in the calibration vehicle can be performed to offset this discrepancy and maintain neutronic equivalency. Current possible modifications to the calibration vehicle include reduction of the primary vessel wall thickness, swapping Zircaloy-4 for stainless steel 316 in the secondary containment, or slight modification to the temperature and pressure of the water environment within the primary vessel. Removal of some of the instrumentation within the calibration vehicle can also serve to slightly increase the PCF. Future efforts include further modification and optimization of the Multi-SERTTA and Multi-SERTTA-CAL designs in preparation of actual TREAT transient testing. Experimental results from both test vehicles will be compared against calculational results and methods to provide validation and support additional neutronics analyses.« less

  3. Gearbox Reliability Collaborative Gearbox 3 Planet Bearing Calibration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Jonathan

    2017-03-24

    The Gearbox Reliability Collaborative gearbox was redesigned to improve its load-sharing characteristics and predicted fatigue life. The most important aspect of the redesign was to replace the cylindrical roller bearings with preloaded tapered roller bearings in the planetary section. Similar to previous work, the strain gages installed on the planet tapered roller bearings were calibrated in a load frame. This report describes the calibration tests and provides the factors necessary to convert the measured units from dynamometer testing to bearing loads, suitable for comparison to engineering models.

  4. 78 FR 48286 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... installed on both LH and RH sides (Airbus modification 153655 applied in production, or modified in-service... unit (LGCIU) interlink communication ARINC 429 (applied in production through Airbus Modification (mod... of MLG actuator Part Number (P/N) 114122014 through Airbus SB A320-32-1407 (Airbus production mod...

  5. Results of the first complete static calibration of the RSRA rotor-load-measurement system

    NASA Technical Reports Server (NTRS)

    Acree, C. W., Jr.

    1984-01-01

    The compound Rotor System Research Aircraft (RSRA) is designed to make high-accuracy, simultaneous measurements of all rotor forces and moments in flight. Physical calibration of the rotor force- and moment-measurement system when installed in the aircraft is required to account for known errors and to ensure that measurement-system accuracy is traceable to the National Bureau of Standards. The first static calibration and associated analysis have been completed with good results. Hysteresis was a potential cause of static calibration errors, but was found to be negligible in flight compared to full-scale loads, and analytical methods have been devised to eliminate hysteresis effects on calibration data. Flight tests confirmed that the calibrated rotor-load-measurement system performs as expected in flight and that it can dependably make direct measurements of fuselage vertical drag in hover.

  6. 78 FR 42062 - Columbia Gas Transmission, LLC; Notice of Intent to Prepare an Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... facilities: New compressor station (Redd Farm Compressor Station) on Columbia's existing Line 1570 in... setting; Modifications to the Smithfield Compressor Station consisting of upgrades to the existing... coolers; Modifications to the Glenville Compressor Station by installing two gas-fired turbines, each...

  7. 46 CFR 182.480 - Flammable vapor detection systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.480 Flammable vapor... permit calibration in a vapor free atmosphere. (g) Electrical connections, wiring, and components for a...

  8. Zirconium Recycle Test Equipment for Hot Cell Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collins, Emory D.; DelCul, Guillermo Daniel; Spencer, Barry B.

    2015-01-30

    The equipment components and assembly support work were modified for optimized, remote hot cell operations to complete this milestone. The modifications include installation of a charging door, Swagelok connector for the off-gas line between the reactor and condenser, and slide valve installation to permit attachment/replacement of the product salt collector bottle.

  9. In-situ calibration: migrating control system IP module calibration from the bench to the storage ring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, Jonah M.; Chin, Michael

    2002-04-30

    The Control System for the Advanced Light Source (ALS) at Lawrence Berkeley National Lab (LBNL) uses in-house designed IndustryPack(registered trademark) (IP) modules contained in compact PCI (cPCI) crates with 16-bit analog I/O to control instrumentation. To make the IP modules interchangeable, each module is calibrated for gain and offset compensation. We initially developed a method of verifying and calibrating the IP modules in a lab bench test environment using a PC with LabVIEW. The subsequent discovery that the ADCs have significant drift characteristics over periods of days of installed operation prompted development of an ''in-situ'' calibration process--one in which themore » IP modules can be calibrated without removing them from the cPCI crates in the storage ring. This paper discusses the original LabVIEW PC calibration and the migration to the proposed in-situ EPICS control system calibration.« less

  10. Radiometer calibration methods and resulting irradiance differences: Radiometer calibration methods and resulting irradiance differences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Habte, Aron; Sengupta, Manajit; Andreas, Afshin

    Accurate solar radiation measured by radiometers depends on instrument performance specifications, installation method, calibration procedure, measurement conditions, maintenance practices, location, and environmental conditions. This study addresses the effect of different calibration methodologies and resulting differences provided by radiometric calibration service providers such as the National Renewable Energy Laboratory (NREL) and manufacturers of radiometers. Some of these methods calibrate radiometers indoors and some outdoors. To establish or understand the differences in calibration methodologies, we processed and analyzed field-measured data from radiometers deployed for 10 months at NREL's Solar Radiation Research Laboratory. These different methods of calibration resulted in a difference ofmore » +/-1% to +/-2% in solar irradiance measurements. Analyzing these differences will ultimately assist in determining the uncertainties of the field radiometer data and will help develop a consensus on a standard for calibration. Further advancing procedures for precisely calibrating radiometers to world reference standards that reduce measurement uncertainties will help the accurate prediction of the output of planned solar conversion projects and improve the bankability of financing solar projects.« less

  11. Photogrammetric Deflection Measurements for the Tiltrotor Test Rig (TTR) Multi-Component Rotor Balance Calibration

    NASA Technical Reports Server (NTRS)

    Solis, Eduardo; Meyn, Larry

    2016-01-01

    Calibrating the internal, multi-component balance mounted in the Tiltrotor Test Rig (TTR) required photogrammetric measurements to determine the location and orientation of forces applied to the balance. The TTR, with the balance and calibration hardware attached, was mounted in a custom calibration stand. Calibration loads were applied using eleven hydraulic actuators, operating in tension only, that were attached to the forward frame of the calibration stand and the TTR calibration hardware via linkages with in-line load cells. Before the linkages were installed, photogrammetry was used to determine the location of the linkage attachment points on the forward frame and on the TTR calibration hardware. Photogrammetric measurements were used to determine the displacement of the linkage attachment points on the TTR due to deflection of the hardware under applied loads. These measurements represent the first photogrammetric deflection measurements to be made to support 6-component rotor balance calibration. This paper describes the design of the TTR and the calibration hardware, and presents the development, set-up and use of the photogrammetry system, along with some selected measurement results.

  12. Self-Powered Neutron Detector Calibration Using a Large Vertical Irradiation Hole of HANARO

    NASA Astrophysics Data System (ADS)

    Kim, Myong-Seop; Park, Byung-Gun; Kang, Gi-Doo

    2018-01-01

    A calibration technology of the self-powered neutron detectors (SPNDs) using a large vertical irradiation hole of HANARO is developed. The 40 Rh-SPNDs are installed on the polycarbonate plastic support, and the gold wires with the same length as the effective length of the rhodium emitter of the SPND are also installed to measure the neutron flux on the SPND. They are irradiated at a low reactor power, and the SPND current is measured using the pico-ammeter. The external gamma-rays which affect the SPND current response are analyzed using the Monte Carlo simulation for various irradiation conditions in HANARO. It is confirmed that the effect of the external gamma-rays to the SPND current is dependent on the reactor characteristics, and that it is affected by materials around the detector. The current signals due to the external gamma-rays can be either positive or negative, in that the net flow of the current may be either in the same or the opposite direction as the neutron-induced current by the rhodium emitter. From the above procedure, the effective calibration methodology of multiple SPNDs using the large hole of HANARO is developed. It could be useful for the calibration experiment of the neutron detectors in the research reactors.

  13. Design of multiplex calibrant plasmids, their use in GMO detection and the limit of their applicability for quantitative purposes owing to competition effects.

    PubMed

    Debode, Frédéric; Marien, Aline; Janssen, Eric; Berben, Gilbert

    2010-03-01

    Five double-target multiplex plasmids to be used as calibrants for GMO quantification were constructed. They were composed of two modified targets associated in tandem in the same plasmid: (1) a part of the soybean lectin gene and (2) a part of the transgenic construction of the GTS40-3-2 event. Modifications were performed in such a way that each target could be amplified with the same primers as those for the original target from which they were derived but such that each was specifically detected with an appropriate probe. Sequence modifications were done to keep the parameters of the new target as similar as possible to those of its original sequence. The plasmids were designed to be used either in separate reactions or in multiplex reactions. Evidence is given that with each of the five different plasmids used in separate wells as a calibrant for a different copy number, a calibration curve can be built. When the targets were amplified together (in multiplex) and at different concentrations inside the same well, the calibration curves showed that there was a competition effect between the targets and this limits the range of copy numbers for calibration over a maximum of 2 orders of magnitude. Another possible application of multiplex plasmids is discussed.

  14. Panorama parking assistant system with improved particle swarm optimization method

    NASA Astrophysics Data System (ADS)

    Cheng, Ruzhong; Zhao, Yong; Li, Zhichao; Jiang, Weigang; Wang, Xin'an; Xu, Yong

    2013-10-01

    A panorama parking assistant system (PPAS) for the automotive aftermarket together with a practical improved particle swarm optimization method (IPSO) are proposed in this paper. In the PPAS system, four fisheye cameras are installed in the vehicle with different views, and four channels of video frames captured by the cameras are processed as a 360-deg top-view image around the vehicle. Besides the embedded design of PPAS, the key problem for image distortion correction and mosaicking is the efficiency of parameter optimization in the process of camera calibration. In order to address this problem, an IPSO method is proposed. Compared with other parameter optimization methods, the proposed method allows a certain range of dynamic change for the intrinsic and extrinsic parameters, and can exploit only one reference image to complete all of the optimization; therefore, the efficiency of the whole camera calibration is increased. The PPAS is commercially available, and the IPSO method is a highly practical way to increase the efficiency of the installation and the calibration of PPAS in automobile 4S shops.

  15. The Impact of Indoor and Outdoor Radiometer Calibration on Solar Measurements: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Habte, Aron; Sengupta, Manajit; Andreas, Afshin

    2016-07-01

    Accurate solar radiation data sets are critical to reducing the expenses associated with mitigating performance risk for solar energy conversion systems, and they help utility planners and grid system operators understand the impacts of solar resource variability. The accuracy of solar radiation measured by radiometers depends on the instrument performance specification, installation method, calibration procedure, measurement conditions, maintenance practices, location, and environmental conditions. This study addresses the effect of calibration methodologies and the resulting calibration responsivities provided by radiometric calibration service providers such as the National Renewable Energy Laboratory (NREL) and manufacturers of radiometers. Some of these radiometers are calibratedmore » indoors, and some are calibrated outdoors. To establish or understand the differences in calibration methodology, we processed and analyzed field-measured data from these radiometers. This study investigates calibration responsivities provided by NREL's broadband outdoor radiometer calibration (BORCAL) and a few prominent manufacturers. The reference radiometer calibrations are traceable to the World Radiometric Reference. These different methods of calibration demonstrated 1% to 2% differences in solar irradiance measurement. Analyzing these values will ultimately assist in determining the uncertainties of the radiometer data and will assist in developing consensus on a standard for calibration.« less

  16. Natural gas the new locomotive fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuskey, L.W.

    1984-01-01

    This is a report on modification of a locomotive diesel engine to a dual-fuel engine to determine if the dual fuel engine in railway service will provide high performance, lower fuel and maintenance costs. After the locomotive was modified and the new governor and linkage were installed by General Motors at the BN's Northtown Diesel Shop near Minneapolis, the locomotive went through startup procedures. General Motors participated in startup. Some calibration, adjustments and minor piping changes were required but in general the problems encountered in startups were quite insignificant. The locomotive was connected to the load box (static test) duringmore » startup and at 720 RPM exceeded the required output for this test as established by the parties. Operation on straight oil over the range from idle through No. 8 throttle notch and on dual fuel from No. 5 through No. 8 throttle notch was smooth as was the transfer from oil to gas and from gas to oil. The engine exhaust on straight oil was almost clear but on gas it was totally clear. 16 references, 3 figures, 4 tables.« less

  17. Using Technology to Expand and Enhance Applied Behavioral Analysis Programs for Children with Autism in Military Families

    DTIC Science & Technology

    2012-07-01

    modification, we changed the script such that the confederate not only exhibits the target skills but also a range of challenging responses that may make...implementation of the target skills more difficult. By including these challenging responses during the role-plays, the parents and tutors are...that may be recommended during the installation. d. VLC Player: i. Open the VLC installer. Under installation type select “recommended.” e. K-Lite

  18. Aerodynamic and propeller performance characteristics of a propfan-powered, semispan model

    NASA Technical Reports Server (NTRS)

    Levin, Alan D.; Smith, Ronald C.; Wood, Richard D.

    1985-01-01

    A semispan wing/body model with a powered propeller was tested to provide data on a total powerplant installation drag penalty of advanced propfan-powered aircraft. The test objectives were to determine the total power plant installation drag penalty on a representative propfan aircraft; to study the effect of configuration modifications on the installed powerplant drag; and to determine performance characteristics of an advanced design propeller which was mounted on a representative nacelle in the presence of a wing.

  19. Test and calibration of the Digital World-Wide Standardized Seismograph

    USGS Publications Warehouse

    Peterson, Jon; Hutt, Charles R.

    1982-01-01

    During the past decade there has been steady progress in the modernization of the global seismograph network operated by the U.S. Geological Survey (USGS). The World-Wide Standardized Seismograph Network (WWSSN) has been augmented by new stations with advanced instrumentation, including the Seismic Research Observatories (SRO) and the modified High-Gain Long-Period (ASRO) stations. One goal in the modernization effort has been to improve signal resolution in the long-period band. A second goal has been to generate a global digital data base to support contemporary computer-based analysis and research. In 1976, a Panel on Seismograph Networks was established by the Committee on Seismology of the National Academy of Sciences to review progress in network seismology and recommend actions that would lead to an improved global data base for seismology. One recommendation in the Panel report (Engdahl, 1977) called for upgrading selected WWSSN stations by the installation of digital recorders. This was viewed as an economical way of expanding the digital network, which had proven itself to be a very promising new tool for earthquake and explosion research. Funds for the development and assembly of 15 digital recorders were provided to the USGS by the Defense Advanced Research Projects Agency and an ad Inoc panel of scientists was convened by the Committee on Seismology to advise the USGS on the selection of stations to be upgraded and on data recording requirements, A total of 19 digital World-Wide Standardized Seismograph (DWWSS) systems will be operational when all are installed. The additional systems were made available through purchase by the USGS and other organizations; for example, the University of Bergen purchased and installed a DWWSS-type recorder and agreed to furnish the USGS with the data. A list of operational and planned DWWSS network stations is given in Table 1.1.As one might expect, the digital recorder turned out to be somewhat more sophisticated than the original concept. It was decided to record three components of long-period data continuously, three components of intermediateperiod data in an event mode, and the vertical-component short-period data in and event mode (with the capability of adding short-period horizontal channels in the future). Special amplifiers were developed for use with the WWSS seismometers, and a 16-bit fixed-point analog-to-digital converter was chosen to provide increased resolution (as opposed to a 16-bit gain-ranged encoder). The microprocessor-based digital recording systems were developed and assembled at the USGS Albuquerque Seismological Laboratory (ASL) and ASL-based technicians began installation at WWSSN stations in 1980.The current and proposed locations of the DWWSSN stations, together with other stations in the Global Digital Seismograph Network (GDSN), are shown on the map in Figure 1.1. A system was operated at Albuquerque for about 18 months, serving as a test bed for evaluation studies. Although the network hardware has been available for some time, the installation of the DWWSSN has proceeded slowly. The National Science Foundation supported installation of six stations and the USGS is funding installation of most of the others; however, the network completion date is conjectural because of funding uncertainties.The DWWSSN stations are supported with supplies and technical assistance from ASL (subject to availability of funds). Data recorded on magnetic tapes are mailed to ASL where they are reviewed for quality, then merged with other GDSN station data on the network-day tapes. Hoffman (1980) provides a description of the network-day tape format. Zirbes and Buland (1981) have developed and published user software for reading and interpreting the day tapes. This report will serve several purposes. One is to provide nominal system transfer functions and calibration information that are needed in the analysis of DWWSSN data. A second purpose is to report on an evaluation of operating characteristics (calibration stability, noise levels, and linearity) that may limit the usefulness of the data and to determine if modifications may be needed to improve the data. It is not an exhaustive study in this respect. We continue to depend mostly on data user feedback to point out deficiencies and we solicit comments whenever anomalies are observed in the data.

  20. 40 CFR 63.564 - Monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operator shall install, calibrate, maintain, and operate a flow indicator and data recorder. The flow... operate a flow indicator with either an audio or visual alarm. The flow indicator and alarm shall be...

  1. 40 CFR 63.564 - Monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operator shall install, calibrate, maintain, and operate a flow indicator and data recorder. The flow... operate a flow indicator with either an audio or visual alarm. The flow indicator and alarm shall be...

  2. 40 CFR 63.564 - Monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operator shall install, calibrate, maintain, and operate a flow indicator and data recorder. The flow... operate a flow indicator with either an audio or visual alarm. The flow indicator and alarm shall be...

  3. 75 FR 30274 - Airworthiness Directives; McDonnell Douglas Corporation Model MD-11 and MD-11F Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... installed on wire harnesses of the tail tank fuel transfer pumps, and to determine if damaged wires are... a permanent modification of the wire harnesses if metallic transitions are not installed, which... harnesses of the tail tank fuel transfer pumps, and to determine if damaged wires are present; and repair...

  4. Calibration methods and tools for KM3NeT

    NASA Astrophysics Data System (ADS)

    Kulikovskiy, Vladimir

    2016-04-01

    The KM3NeT detectors, ARCA and ORCA, composed of several thousands digital optical modules, are in the process of their realization in the Mediterranean Sea. Each optical module contains 31 3-inch photomultipliers. Readout of the optical modules and other detector components is synchronized at the level of sub-nanoseconds. The position of the module is measured by acoustic piezo detectors inside the module and external acoustic emitters installed on the bottom of the sea. The orientation of the module is obtained with an internal attitude and heading reference system chip. Detector calibration, i.e. timing, positioning and sea-water properties, is overviewed in this talk and discussed in detail in this conference. Results of the procedure applied to the first detector unit ready for installation in the deep sea will be shown.

  5. V/STOL tilt rotor research aircraft. Volume 3: Ship 2 instrumentation

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Information covering sensor cables, sensor installation, and sensor calibration for the XV-15 aircraft number 2 is included. For each junction box (J-box) designation there is a schematic of the J-box disconnect harness, instrumentation worksheets which show sensor location, and calibration data sheets for each sensor associated with that J-box. An index of measurement data codes to J-box locations is given in a table. Cross references are given.

  6. V/STOL tilt rotor research aircraft. Volume 2: Ship 1 instrumentation

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Information covering sensor cables, sensor installation, and sensor calibration for the XV-15 aircraft number 1 is included. For each junction box (J-box) designation there is a schematic of the J-box disconnect harness instrumentation worksheets which show sensor location, and calibration data sheets for each sensor associated with that J-box. An index of measurement item codes to J-box locations is given in a table. Cross references are given.

  7. WFC3: SMOV and Cycle 17 Calibration Programs

    NASA Astrophysics Data System (ADS)

    Deustua, Susana E.; MacKenty, J.; Kimble, R.; Martel, A. R.; Baggett, S.; Barker, E.; Borders, T.; Bushouse, H.; Brown, T. M.; Dressel, L.; Dulude, M.; Hartig, G.; Hilbert, B.; Kalirai, J.; Quijano, J. Kim; Kozhurina-Platais, V.; McLean, B.; McCullough, P.; Pavlovsky, C.; Petro, L.; Pirzkal, N.; Rajan, A.; Riess, A.; Sabbi, E.; Viana, A.; Wheeler, T.; Wong, M. H.; Kuemmel, M.; Kuntschner, H.; Walsh, J.; WFC3 Team

    2010-01-01

    The Servicing Mission Observatory Verification (SMOV4) commissioning activities were carried out over 3 months following the installation of Wide Field Camera 3 (WFC3) into HST during Servicing Mission 4. Following SMOV4, once WFC3 was enabled for routine science observations, the WFC3 Cycle 17 Calibration program began. Both SMOV4 and Cycle 17 calibration programs characterize the UVIS and IR channels, monitor their behavior with time, and provide the reference files used in the data reduction pipeline. Comprising 43 SMOV4 and 35 Cycle 17 programs, the commissioning and calibration of WFC3 require approximately 400 orbits during its first 15 months on-orbit. This paper discusses the contents, rationale, and initial results of WFC3 SMOV4 and Cycle 17 Calibration Programs. We also highlight some issues that may affect GO programs.

  8. Preparation of the calibration unit for LINC-NIRVANA

    NASA Astrophysics Data System (ADS)

    Labadie, Lucas; de Bonis, Fulvio; Egner, Sebastian; Herbst, Tom; Bizenberger, Peter; Kürster, Martin; Delboulé, Alain

    2008-07-01

    We present in this paper the status of the calibration unit for the interferometric infrared imager LINC-NIRVANA that will be installed on the Large Binocular Telescope, Arizona. LINC-NIRVANA will combine high angular resolution (~10 mas in J), and wide field-of-view (up to 2'×2') thanks to the conjunct use of interferometry and MCAO. The goal of the calibration unit is to provide calibration tools for the different sub-systems of the instrument. We give an overview of the different tasks that are foreseen as well as of the preliminary detailed design. We show some interferometric results obtained with specific fiber splitters optimized for LINC-NIRVANA. The different components of the calibration unit will be used either during the integration phase on site, or during the science exploitation phase of the instrument.

  9. Portable Dynamic Pressure Calibrator

    NASA Technical Reports Server (NTRS)

    Wright, Morgan S.; Maynard, Everett (Technical Monitor)

    1996-01-01

    A portable, dynamic pressure calibrator was fabricated for use on wind tunnel models at NASA-Ames Research Center. The calibrator generates sine wave pressures at levels up to 1 PSIG P-P(168dB) at frequencies from 10Hz to 6KHz and .5 PSIG P.P (162dB) at frequencies from 6KHz to 20KHz. The calibrator consists of two units connected by a single cable. The handheld unit contains a pressure transducer, speaker, and deadman switch. This unit allows application of dynamic pressure to transducers/ports on installed wind tunnel models. The base unit contains all of power supplies, controls and displays. This unit allows amplitude and frequency to be set and verified at a safe location off of the model.

  10. Cryogenic radiometers and intensity-stabilized lasers for Eos radiometric calibrations

    NASA Technical Reports Server (NTRS)

    Foukal, P.; Hoyt, C.; Jauniskis, L.

    1991-01-01

    Liquid helium-cooled electrical substitution radiometers (ESRs) provide irradiance standards with demonstrated absolute accuracy at the 0.01 percent level, spectrally flat response between the UV and IR, and sensitivity down to 0.1 nW/sq cm. We describe an automated system developed for NASA - Goddard Space Flight Center, consisting of a cryogenic ESR illuminated by servocontrolled laser beams. This system is designed to provide calibration of single-element and array detectors over the spectral range between 257nm in the UV to 10.6 microns in the IR. We also describe a cryogenic ESR optimized for black body calibrations that has been installed at NIST, and another that is under construction for calibrations of the CERES scanners planned for Eos.

  11. 75 FR 34200 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... of Application for Approval of Discontinuance or Modification of a Railroad Signal System Pursuant to... of the signal, as detailed below. Docket Number: FRA-2010-0084. Applicant: Pan Am Railways, Mr... CPF-428, all associated appliances, and the installation of an automatic block signal at mile 428.27...

  12. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, has been installed on the south side of the high bay. In view below are several levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. 76 FR 5061 - Special Conditions: TTF Aerospace, LLC, Modification to Boeing Model 767-300 Series Airplanes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ..., will have a novel or unusual design features associated with the pilot lower lobe crew rest module (CRM...) for installation of a lower lobe pilot crew rest module (CRM) in Boeing Model 767-300 series airplanes. The CRM will be a one-piece, self-contained unit for installation in the forward portion of the aft...

  14. 76 FR 37025 - Make Inoperative Exemptions; Vehicle Modifications To Accommodate People With Disabilities, Side...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... the seat. Many vehicles will depend on side impact air bag technology to meet all of the injury... installing side air bags in vehicle seats and/or door panels and side roof rails. The phase-in of the... expressed concern that: ``* * * torso side air bags are commonly installed in the outboard side of the OEM...

  15. 40 CFR 1065.340 - Diluted exhaust flow (CVS) calibration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial CVS installation and whenever corrective action does not resolve a failure to meet the diluted... such as a subsonic venturi flow meter, a long-radius ASME/NIST flow nozzle, a smooth approach orifice...

  16. 40 CFR 1065.340 - Diluted exhaust flow (CVS) calibration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial CVS installation and whenever corrective action does not resolve a failure to meet the diluted... such as a subsonic venturi flow meter, a long-radius ASME/NIST flow nozzle, a smooth approach orifice...

  17. 40 CFR 1065.340 - Diluted exhaust flow (CVS) calibration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initial CVS installation and whenever corrective action does not resolve a failure to meet the diluted... such as a subsonic venturi flow meter, a long-radius ASME/NIST flow nozzle, a smooth approach orifice...

  18. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baggu, Murali M; Smith, Kandler A; Friedl, Andrew

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS withmore » little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.« less

  19. Calibration of LOFAR data on the cloud

    NASA Astrophysics Data System (ADS)

    Sabater, J.; Sánchez-Expósito, S.; Best, P.; Garrido, J.; Verdes-Montenegro, L.; Lezzi, D.

    2017-04-01

    New scientific instruments are starting to generate an unprecedented amount of data. The Low Frequency Array (LOFAR), one of the Square Kilometre Array (SKA) pathfinders, is already producing data on a petabyte scale. The calibration of these data presents a huge challenge for final users: (a) extensive storage and computing resources are required; (b) the installation and maintenance of the software required for the processing is not trivial; and (c) the requirements of calibration pipelines, which are experimental and under development, are quickly evolving. After encountering some limitations in classical infrastructures like dedicated clusters, we investigated the viability of cloud infrastructures as a solution. We found that the installation and operation of LOFAR data calibration pipelines is not only possible, but can also be efficient in cloud infrastructures. The main advantages were: (1) the ease of software installation and maintenance, and the availability of standard APIs and tools, widely used in the industry; this reduces the requirement for significant manual intervention, which can have a highly negative impact in some infrastructures; (2) the flexibility to adapt the infrastructure to the needs of the problem, especially as those demands change over time; (3) the on-demand consumption of (shared) resources. We found that a critical factor (also in other infrastructures) is the availability of scratch storage areas of an appropriate size. We found no significant impediments associated with the speed of data transfer, the use of virtualization, the use of external block storage, or the memory available (provided a minimum threshold is reached). Finally, we considered the cost-effectiveness of a commercial cloud like Amazon Web Services. While a cloud solution is more expensive than the operation of a large, fully-utilized cluster completely dedicated to LOFAR data reduction, we found that its costs are competitive if the number of datasets to be analysed is not high, or if the costs of maintaining a system capable of calibrating LOFAR data become high. Coupled with the advantages discussed above, this suggests that a cloud infrastructure may be favourable for many users.

  20. Guidebook on LANDFIRE fuels data acquisition, critique, modification, maintenance, and model calibration

    Treesearch

    Richard D. Stratton

    2009-01-01

    With the advent of LANDFIRE fuels layers, an increasing number of specialists are using the data in a variety of fire modeling systems. However, a comprehensive guide on acquiring, critiquing, and editing (ACE) geospatial fuels data does not exist. This paper provides guidance on ACE as well as on assembling a geospatial fuels team, model calibration, and maintaining...

  1. The multi-channel infrared sea truth radiometric calibrator (MISTRC)

    USGS Publications Warehouse

    Suarez, M.J.; Emery, W. J.; Wick, G.A.

    1997-01-01

    A new multichannel infrared sea truth radiometer has been designed and built to improve validation of satellite-determined sea surface temperature. Horizontal grid polarized filters installed on the shortwave channels are very effective in reducing reflected solar radiation and in improving the noise characteristics. The system uses a continuous (every other cycle) seawater calibration technique. An analysis of the data from its first deployment is presented and recommendations are made for further improving the experimental method.

  2. Time Transfer Through Optical Fibers (TTTOF): First Results of Calibrated Clock Comparisons

    DTIC Science & Technology

    2009-11-01

    satellite time and frequency transfer ( TWSTFT ) scheme. We discuss procedures for a proper calibration of such time transfer through optical fibers links... TWSTFT ground stations, which are currently spread over the PTB campus, to a common location at a Report Documentation Page Form ApprovedOMB No. 0704...PTTI) Meeting 90 new site (see Figure 1 and [6] for details). From late 2010 onwards, the TWSTFT stations will be installed on top of a high

  3. Omega Dante Soft X-Ray Power Diagnostic Component Calibration at the National Synchrotron Light Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, K; Weber, F; Dewald, E

    2004-04-15

    The Dante soft x-ray spectrometer installed on the Omega laser facility at the Laboratory for Laser Energetics, University of Rochester is a twelve-channel filter-edge defined x-ray power diagnostic. It is used to measure the absolute flux from direct drive, indirect drive (hohlraums) and other plasma sources. Calibration efforts using two beam lines, U3C (50eV-1keV) and X8A (1keV-6keV) at the National Synchrotron Light Source (NSLS) have been implemented to insure the accuracy of these measurements. We have calibrated vacuum x-ray diodes, mirrors and filters.

  4. Calibration of a Computer Based Instrumentation for Flight Research

    NASA Technical Reports Server (NTRS)

    Forsyth, T. J.; Reynolds, R. S. (Technical Monitor)

    1997-01-01

    NASA Ames Research Center has been investigating a Differential Global Positioning System (DGPS) for future use as a Category II/III landing system. The DGPS navigation system was developed and installed on a B200 King Air aircraft. Instrumentation that is not calibrated and verified as a total operating system can have errors or not work correctly. Systems need to be checked for cross talk and that they work together accurately. It is imperative that the instrumentation and computer do not affect aircraft avionics and instrumentation needed for aircraft operation. This paper discusses calibration and verification principles of a computer based instrumentation airborne system.

  5. In situ calibration of an infrared imaging video bolometer in the Large Helical Device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mukai, K., E-mail: mukai.kiyofumi@LHD.nifs.ac.jp; Peterson, B. J.; Pandya, S. N.

    The InfraRed imaging Video Bolometer (IRVB) is a powerful diagnostic to measure multi-dimensional radiation profiles in plasma fusion devices. In the Large Helical Device (LHD), four IRVBs have been installed with different fields of view to reconstruct three-dimensional profiles using a tomography technique. For the application of the measurement to plasma experiments using deuterium gas in LHD in the near future, the long-term effect of the neutron irradiation on the heat characteristics of an IRVB foil should be taken into account by regular in situ calibration measurements. Therefore, in this study, an in situ calibration system was designed.

  6. UKIRT Upgrades Program: design and installation of the Dome Ventilation System (DVS)

    NASA Astrophysics Data System (ADS)

    Neff, D. H.; Hileman, Edward A.; Kain, S. J.; Cavedoni, Charles P.; Chuter, Timothy C.

    1997-03-01

    In order to encourage adequate dome ventilation to reduce or eliminate dome seeing at the 3.8 m United Kingdom Infrared Telescope (UKIRT), a dome ventilation system (DVS) was designed to be installed in the lower dome skirt. The modifications to the dome for the new DVS apertures consisted of installing a reinforcing frame containing an insulated rollup door and adjustable louvers. This paper describes the finite element structural analysis of the reinforcing frame, the detailed design of the frame hardware, the design of the programmable language control (PLC) system for controlling the opening and closing of the rollup doors, and the fabrication and installation of a prototype frame assembly. To date, a prototype assembly has been installed that confirms the design, and fifteen production assemblies are currently under fabrication for installation by September 1996.

  7. Contaminated waste incinerator modification study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolf, F.

    1995-08-01

    An explosive waste incinerator (EWI) can be installed in the existing Badger AAP Contaminated Waste Processor (CWP). An engineering evaluation of installing a rotary kiln furnace to dispose of waste energetic material has shown the installation to be possible. An extensive literature search was completed to develop the known proven methods of energetic waste disposal. Current incineration practice including thermal treatment alternatives was investigated. Existing and new equipment was reviewed for adequacy. Current CWP operations and hazardous waste to be disposed of were determined. Comparisons were made with other AAP`s EWI.

  8. GRC-2007-C-02471

    NASA Image and Video Library

    2003-12-19

    Orion Capsule and Launch Abort System (LAS) installed in the NASA Glenn 8x6 Supersonic Wind Tunnel for testing. This test is an Aero Acoustic test of the LAS. Pictured is the calibration of the model's angle of attack

  9. GRC-2007-C-02472

    NASA Image and Video Library

    2003-12-19

    Orion Capsule and Launch Abort System (LAS) installed in the NASA Glenn 8x6 Supersonic Wind Tunnel for testing. This test is an Aero Acoustic test of the LAS. Pictured is the calibration of the model's angle of attack

  10. Absolute sensitivity calibration of an extreme ultraviolet spectrometer for tokamak measurements

    NASA Astrophysics Data System (ADS)

    Guirlet, R.; Schwob, J. L.; Meyer, O.; Vartanian, S.

    2017-01-01

    An extreme ultraviolet spectrometer installed on the Tore Supra tokamak has been calibrated in absolute units of brightness in the range 10-340 Å. This has been performed by means of a combination of techniques. The range 10-113 Å was absolutely calibrated by using an ultrasoft-X ray source emitting six spectral lines in this range. The calibration transfer to the range 113-182 Å was performed using the spectral line intensity branching ratio method. The range 182-340 Å was calibrated thanks to radiative-collisional modelling of spectral line intensity ratios. The maximum sensitivity of the spectrometer was found to lie around 100 Å. Around this wavelength, the sensitivity is fairly flat in a 80 Å wide interval. The spatial variations of sensitivity along the detector assembly were also measured. The observed trend is related to the quantum efficiency decrease as the angle of the incoming photon trajectories becomes more grazing.

  11. Improvements to the Hubble Space Telescope COS/FUV Wavelength Calibration at Lifetime Position 4

    NASA Astrophysics Data System (ADS)

    Plesha, Rachel; Ake, Thomas B.; De Rosa, Gisella; Oliveira, Cristina M.; Penton, Steven V.; Snyder, Elaine M.

    2018-06-01

    The Cosmic Origins Spectrograph (COS) was installed on the Hubble Space Telescope in 2009, and the FUV detector is currently operating at the 4th lifetime position (LP4). The COS team at the Space Telescope Science Institute has been improving the wavelength calibration of the FUV channel at each lifetime position. For the LP4 solution we obtained special calibration data as well as new lamp spectra to update the lamp template used at LP4 with the goal of achieving a wavelength calibration accuracy of ± 3 pixels. Additionally, we derived a new solution for the G130M/1222 cenwave which we expect to be more frequently used at this lifetime position due to the COS2025 policy in place on the other G130M settings. Here we present the results and methodology behind the wavelength calibration solutions at LP4.

  12. Readiness of the ATLAS Tile Calorimeter for LHC collisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aad, G.; Abbott, B.; Abdallah, J.

    The Tile hadronic calorimeter of the ATLAS detector has undergone extensive testing in the experimental hall since its installation in late 2005. The readout, control and calibration systems have been fully operational since 2007 and the detector has successfully collected data from the LHC single beams in 2008 and first collisions in 2009. This paper gives an overview of the Tile Calorimeter performance as measured using random triggers, calibration data, data from cosmic ray muons and single beam data. The detector operation status, noise characteristics and performance of the calibration systems are presented, as well as the validation of themore » timing and energy calibration carried out with minimum ionising cosmic ray muons data. The calibration systems' precision is well below the design value of 1%. The determination of the global energy scale was performed with an uncertainty of 4%. © 2010 CERN for the benefit of the ATLAS collaboration.« less

  13. Readiness of the ATLAS Tile Calorimeter for LHC collisions

    DOE PAGES

    Aad, G.; Abbott, B.; Abdallah, J.; ...

    2010-12-08

    The Tile hadronic calorimeter of the ATLAS detector has undergone extensive testing in the experimental hall since its installation in late 2005. The readout, control and calibration systems have been fully operational since 2007 and the detector has successfully collected data from the LHC single beams in 2008 and first collisions in 2009. This paper gives an overview of the Tile Calorimeter performance as measured using random triggers, calibration data, data from cosmic ray muons and single beam data. The detector operation status, noise characteristics and performance of the calibration systems are presented, as well as the validation of themore » timing and energy calibration carried out with minimum ionising cosmic ray muons data. The calibration systems' precision is well below the design value of 1%. The determination of the global energy scale was performed with an uncertainty of 4%. © 2010 CERN for the benefit of the ATLAS collaboration.« less

  14. MetaQuant: a tool for the automatic quantification of GC/MS-based metabolome data.

    PubMed

    Bunk, Boyke; Kucklick, Martin; Jonas, Rochus; Münch, Richard; Schobert, Max; Jahn, Dieter; Hiller, Karsten

    2006-12-01

    MetaQuant is a Java-based program for the automatic and accurate quantification of GC/MS-based metabolome data. In contrast to other programs MetaQuant is able to quantify hundreds of substances simultaneously with minimal manual intervention. The integration of a self-acting calibration function allows the parallel and fast calibration for several metabolites simultaneously. Finally, MetaQuant is able to import GC/MS data in the common NetCDF format and to export the results of the quantification into Systems Biology Markup Language (SBML), Comma Separated Values (CSV) or Microsoft Excel (XLS) format. MetaQuant is written in Java and is available under an open source license. Precompiled packages for the installation on Windows or Linux operating systems are freely available for download. The source code as well as the installation packages are available at http://bioinformatics.org/metaquant

  15. Ultrasonic Method for Deployment Mechanism Bolt Element Preload Verification

    NASA Technical Reports Server (NTRS)

    Johnson, Eric C.; Kim, Yong M.; Morris, Fred A.; Mitchell, Joel; Pan, Robert B.

    2014-01-01

    Deployment mechanisms play a pivotal role in mission success. These mechanisms often incorporate bolt elements for which a preload within a specified range is essential for proper operation. A common practice is to torque these bolt elements to a specified value during installation. The resulting preload, however, can vary significantly with applied torque for a number of reasons. The goal of this effort was to investigate ultrasonic methods as an alternative for bolt preload verification in such deployment mechanisms. A family of non-explosive release mechanisms widely used by satellite manufacturers was chosen for the work. A willing contractor permitted measurements on a sampling of bolt elements for these release mechanisms that were installed by a technician following a standard practice. A variation of approximately 50% (+/- 25%) in the resultant preloads was observed. An alternative ultrasonic method to set the preloads was then developed and calibration data was accumulated. The method was demonstrated on bolt elements installed in a fixture instrumented with a calibrated load cell and designed to mimic production practice. The ultrasonic method yielded results within +/- 3% of the load cell reading. The contractor has since adopted the alternative method for its future production. Introduction

  16. Interchangeable end effector tools utilized on the PFMA

    NASA Technical Reports Server (NTRS)

    Cody, Joe; Carroll, John; Crow, George; Gierow, Paul; Littles, Jay; Maness, Michael; Morrison, Jim

    1992-01-01

    An instrumented task board, used for measuring forces applied by the Protoflight Manipulator Arm (PFMA) to the task board, was fabricated and delivered to Marshall Space Flight Center. SRS Technologies phased out the existing IBM compatible data acquisition system, used with a instrumented task board, and integrated the force measuring electronic hardware in with the Macintosh II data acquisition system. The purpose of this change was to acquire all data with the same time tag, allowing easier and more accurate data reduction in addition to real-time graphics. A three-dimensional optical position sensing system for determining the location of the PFMA's end effect or in reference to the center of the instrumented task board was also designed and delivered under. An improved task board was fabricated which included an improved instrumented beam design. The modified design of the task board improved the force/torque measurement system by increasing the sensitivity, reliability, load range and ease of maintenance. A calibration panel for the optical position system was also designed and fabricated. The calibration method developed for the position sensors enhanced the performance of the sensors as well as simplified the installation and calibration procedures required. The modifications made under this effort expanded the capabilities of the task board system. The system developed determines the arm's position relative to the task board and measures the signals to the joints resulting from the operator's control signals in addition to the task board forces. The software and hardware required to calculate and record the position of the PFMA during the performance of tasks with the instrumented task board were defined, designed and delivered to MSFC. PFMA joint input signals can be measured from a breakout box to evaluate the sensitivity or response of the arm operation to control commands. The data processing system provides the capability for post processing of time-history graphics and plots of the PFMA positions, the operator's actions, and the PFMA servo reactions in addition to realtime force and position sensor data presentation.

  17. Interchangeable end effector tools utilized on the PFMA

    NASA Astrophysics Data System (ADS)

    Cody, Joe; Carroll, John; Crow, George; Gierow, Paul; Littles, Jay; Maness, Michael; Morrison, Jim

    1992-02-01

    An instrumented task board, used for measuring forces applied by the Protoflight Manipulator Arm (PFMA) to the task board, was fabricated and delivered to Marshall Space Flight Center. SRS Technologies phased out the existing IBM compatible data acquisition system, used with a instrumented task board, and integrated the force measuring electronic hardware in with the Macintosh II data acquisition system. The purpose of this change was to acquire all data with the same time tag, allowing easier and more accurate data reduction in addition to real-time graphics. A three-dimensional optical position sensing system for determining the location of the PFMA's end effect or in reference to the center of the instrumented task board was also designed and delivered under. An improved task board was fabricated which included an improved instrumented beam design. The modified design of the task board improved the force/torque measurement system by increasing the sensitivity, reliability, load range and ease of maintenance. A calibration panel for the optical position system was also designed and fabricated. The calibration method developed for the position sensors enhanced the performance of the sensors as well as simplified the installation and calibration procedures required. The modifications made under this effort expanded the capabilities of the task board system. The system developed determines the arm's position relative to the task board and measures the signals to the joints resulting from the operator's control signals in addition to the task board forces. The software and hardware required to calculate and record the position of the PFMA during the performance of tasks with the instrumented task board were defined, designed and delivered to MSFC. PFMA joint input signals can be measured from a breakout box to evaluate the sensitivity or response of the arm operation to control commands. The data processing system provides the capability for post processing of time-history graphics and plots of the PFMA positions, the operator's actions, and the PFMA servo reactions in addition to realtime force and position sensor data presentation.

  18. Use of inexpensive pressure transducers for measuring water levels in wells

    USGS Publications Warehouse

    Keeland, B.D.; Dowd, J.F.; Hardegree, W.S.

    1997-01-01

    Frequent measurement of below ground water levels at multiple locations is an important component of many wetland ecosystem studies. These measurements, however, are usually time consuming, labor intensive, and expensive. This paper describes a water-level sensor that is inexpensive and easy to construct. The sensor is placed below the expected low water level in a shallow well and, when connected to a datalogger, uses a pressure transducer to detect groundwater or surface water elevations. Details of pressure transducer theory, sensor construction, calibration, and examples of field installations are presented. Although the transducers must be individually calibrated, the sensors have a linear response to changing water levels (r2 ??? .999). Measurement errors resulting from temperature fluctuations are shown to be about 4 cm over a 35??C temperature range, but are minimal when the sensors are installed in groundwater wells where temperatures are less variable. Greater accuracy may be obtained by incorporating water temperature data into the initial calibration (0.14 cm error over a 35??C temperature range). Examples of the utility of these sensors in studies of groundwater/surface water interactions and the effects of water level fluctuations on tree growth are provided. ?? 1997 Kluwer Academic Publishers.

  19. Modification of a liquid hydrogen tank for integrated refrigeration and storage

    NASA Astrophysics Data System (ADS)

    Swanger, A. M.; Jumper, K. M.; Fesmire, J. E.; Notardonato, W. U.

    2015-12-01

    The modification and outfitting of a 125,000-liter liquid hydrogen tank was performed to provide integrated refrigeration and storage capability. These functions include zero boil-off, liquefaction, and densification and therefore require provisions for sub-atmospheric tank pressures within the vacuum-jacketed, multilayer insulated tank. The primary structural modification was to add stiffening rings inside the inner vessel. The internal stiffening rings were designed, built, and installed per the ASME Boiler and Pressure Vessel Code, Section VIII, to prevent collapse in the case of vacuum jacket failure in combination with sub-atmospheric pressure within the tank. For the integrated refrigeration loop, a modular, skeleton-type heat exchanger, with refrigerant temperature instrumentation, was constructed using the stiffening rings as supports. To support the system thermal performance testing, three custom temperature rakes were designed and installed along the 21-meter length of the tank, once again using rings as supports. The temperature rakes included a total of 20 silicon diode temperature sensors mounted both vertically and radially to map the bulk liquid temperature within the tank. The tank modifications were successful and the system is now operational for the research and development of integrated refrigeration technology.

  20. Assessment and certification of neonatal incubator sensors through an inferential neural network.

    PubMed

    de Araújo, José Medeiros; de Menezes, José Maria Pires; Moura de Albuquerque, Alberto Alexandre; da Mota Almeida, Otacílio; Ugulino de Araújo, Fábio Meneghetti

    2013-11-15

    Measurement and diagnostic systems based on electronic sensors have been increasingly essential in the standardization of hospital equipment. The technical standard IEC (International Electrotechnical Commission) 60601-2-19 establishes requirements for neonatal incubators and specifies the calibration procedure and validation tests for such devices using sensors systems. This paper proposes a new procedure based on an inferential neural network to evaluate and calibrate a neonatal incubator. The proposal presents significant advantages over the standard calibration process, i.e., the number of sensors is drastically reduced, and it runs with the incubator under operation. Since the sensors used in the new calibration process are already installed in the commercial incubator, no additional hardware is necessary; and the calibration necessity can be diagnosed in real time without the presence of technical professionals in the neonatal intensive care unit (NICU). Experimental tests involving the aforementioned calibration system are carried out in a commercial incubator in order to validate the proposal.

  1. Assessment and Certification of Neonatal Incubator Sensors through an Inferential Neural Network

    PubMed Central

    de Araújo Júnior, José Medeiros; de Menezes Júnior, José Maria Pires; de Albuquerque, Alberto Alexandre Moura; Almeida, Otacílio da Mota; de Araújo, Fábio Meneghetti Ugulino

    2013-01-01

    Measurement and diagnostic systems based on electronic sensors have been increasingly essential in the standardization of hospital equipment. The technical standard IEC (International Electrotechnical Commission) 60601-2-19 establishes requirements for neonatal incubators and specifies the calibration procedure and validation tests for such devices using sensors systems. This paper proposes a new procedure based on an inferential neural network to evaluate and calibrate a neonatal incubator. The proposal presents significant advantages over the standard calibration process, i.e., the number of sensors is drastically reduced, and it runs with the incubator under operation. Since the sensors used in the new calibration process are already installed in the commercial incubator, no additional hardware is necessary; and the calibration necessity can be diagnosed in real time without the presence of technical professionals in the neonatal intensive care unit (NICU). Experimental tests involving the aforementioned calibration system are carried out in a commercial incubator in order to validate the proposal. PMID:24248278

  2. Solar heating and domestic hot water system installed at North Dallas High School

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  3. Design and Modification of an Installation Method to Stabilize Small Trapezoidal Flumes in Drainage Ditches

    Treesearch

    Charles A. Harrison; Susan O’Ney

    2002-01-01

    We developed procedures for installing prefabricated trapezoidal flumes in deep (10 to 12 feet) drainage ditches to monitor hydrologic functions and provide gauge locations for sampling discharge. Flows from the instrumented basins were generally low, but the ditches were occasionally subject to high flows caused by rain events of 2 to 3 inches or more. These high flow...

  4. Pixel-based CTE Correction of ACS/WFC: Modifications To The ACS Calibration Pipeline (CALACS)

    NASA Astrophysics Data System (ADS)

    Smith, Linda J.; Anderson, J.; Armstrong, A.; Avila, R.; Bedin, L.; Chiaberge, M.; Davis, M.; Ferguson, B.; Fruchter, A.; Golimowski, D.; Grogin, N.; Hack, W.; Lim, P. L.; Lucas, R.; Maybhate, A.; McMaster, M.; Ogaz, S.; Suchkov, A.; Ubeda, L.

    2012-01-01

    The Advanced Camera for Surveys (ACS) was installed on the Hubble Space Telescope (HST) nearly ten years ago. Over the last decade, continuous exposure to the harsh radiation environment has degraded the charge transfer efficiency (CTE) of the CCDs. The worsening CTE impacts the science that can be obtained by altering the photometric, astrometric and morphological characteristics of sources, particularly those farthest from the readout amplifiers. To ameliorate these effects, Anderson & Bedin (2010, PASP, 122, 1035) developed a pixel-based empirical approach to correcting ACS data by characterizing the CTE profiles of trails behind warm pixels in dark exposures. The success of this technique means that it is now possible to correct full-frame ACS/WFC images for CTE degradation in the standard data calibration and reduction pipeline CALACS. Over the past year, the ACS team at STScI has developed, refined and tested the new software. The details of this work are described in separate posters. The new code is more effective at low flux levels (< 50 electrons) than the original Anderson & Bedin code, and employs a more accurate time and temperature dependence for CTE. The new CALACS includes the automatic removal of low-level bias stripes (produced by the post-repair ACS electronics) and pixel-based CTE correction. In addition to the standard cosmic ray corrected, flat-fielded and drizzled data products (crj, flt and drz files) there are three new equivalent files (crc, flc and drc) which contain the CTE-corrected data products. The user community will be able to choose whether to use the standard or CTE-corrected products.

  5. Installation Restoration Program. Phase II. Problem Confirmation Study, Westover AFB, Chicopee, Massachusetts.

    DTIC Science & Technology

    1984-05-01

    surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...CHESTER PH MAY 84 UNCLASSIFIED F336 iS-80-D-4-86 F/G 5/ 1 NL I l/hlhh..E/hhE mhh~hhElhElhhI mhhmhmmhhmhl Iflf lllflflflflfllfl mhhhhhmhhmmhhu Llw 111112...w1L 1 6 MICROCOPY RESOLUTION TEST CHART NATIONIAL BUREAU OF STANDARDS- 1963-A Installation Restoration Proaram AD-A 145 352 * Final Report Phase 11

  6. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lowers the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, for installation on the south side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Automated geographic registration and radiometric correction for UAV-based mosaics

    NASA Astrophysics Data System (ADS)

    Thomasson, J. Alex; Shi, Yeyin; Sima, Chao; Yang, Chenghai; Cope, Dale A.

    2017-05-01

    Texas A and M University has been operating a large-scale, UAV-based, agricultural remote-sensing research project since 2015. To use UAV-based images in agricultural production, many high-resolution images must be mosaicked together to create an image of an agricultural field. Two key difficulties to science-based utilization of such mosaics are geographic registration and radiometric calibration. In our current research project, image files are taken to the computer laboratory after the flight, and semi-manual pre-processing is implemented on the raw image data, including ortho-mosaicking and radiometric calibration. Ground control points (GCPs) are critical for high-quality geographic registration of images during mosaicking. Applications requiring accurate reflectance data also require radiometric-calibration references so that reflectance values of image objects can be calculated. We have developed a method for automated geographic registration and radiometric correction with targets that are installed semi-permanently at distributed locations around fields. The targets are a combination of black (≍5% reflectance), dark gray (≍20% reflectance), and light gray (≍40% reflectance) sections that provide for a transformation of pixel-value to reflectance in the dynamic range of crop fields. The exact spectral reflectance of each target is known, having been measured with a spectrophotometer. At the time of installation, each target is measured for position with a real-time kinematic GPS receiver to give its precise latitude and longitude. Automated location of the reference targets in the images is required for precise, automated, geographic registration; and automated calculation of the digital-number to reflectance transformation is required for automated radiometric calibration. To validate the system for radiometric calibration, a calibrated UAV-based image mosaic of a field was compared to a calibrated single image from a manned aircraft. Reflectance values in selected zones of each image were strongly linearly related, and the average error of UAV-mosaic reflectances was 3.4% in the red band, 1.9% in the green band, and 1.5% in the blue band. Based on these results, the proposed physical system and automated software for calibrating UAV mosaics show excellent promise.

  8. KSC-05pd2530

    NASA Image and Video Library

    2005-11-30

    KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility Bay 2, the nose cap of space shuttle Endeavour is prepared for installation of thermal protection system blankets. Endeavour recently came out of a nearly two-year Orbiter Major Modification period which began in December 2003. Engineers and technicians spent 900,000 hours performing 124 modifications to the vehicle. These included all recommended return-to-flight safety modifications, bonding more than 1,000 thermal protection system tiles and inspecting more than 150 miles of wiring throughout the orbiter. Shuttle major modification periods are scheduled at regular intervals to enhance safety and performance, infuse new technology, and allow for thorough inspections of the airframe and wiring of the vehicles. This was the second of these modification periods performed entirely at Kennedy Space Center. Endeavour's previous modification was completed in March 1997.

  9. Five-Hole Flow Angle Probe Calibration for the NASA Glenn Icing Research Tunnel

    NASA Technical Reports Server (NTRS)

    Gonsalez, Jose C.; Arrington, E. Allen

    1999-01-01

    A spring 1997 test section calibration program is scheduled for the NASA Glenn Research Center Icing Research Tunnel following the installation of new water injecting spray bars. A set of new five-hole flow angle pressure probes was fabricated to properly calibrate the test section for total pressure, static pressure, and flow angle. The probes have nine pressure ports: five total pressure ports on a hemispherical head and four static pressure ports located 14.7 diameters downstream of the head. The probes were calibrated in the NASA Glenn 3.5-in.-diameter free-jet calibration facility. After completing calibration data acquisition for two probes, two data prediction models were evaluated. Prediction errors from a linear discrete model proved to be no worse than those from a full third-order multiple regression model. The linear discrete model only required calibration data acquisition according to an abridged test matrix, thus saving considerable time and financial resources over the multiple regression model that required calibration data acquisition according to a more extensive test matrix. Uncertainties in calibration coefficients and predicted values of flow angle, total pressure, static pressure. Mach number. and velocity were examined. These uncertainties consider the instrumentation that will be available in the Icing Research Tunnel for future test section calibration testing.

  10. Air data position-error calibration using state reconstruction techniques

    NASA Technical Reports Server (NTRS)

    Whitmore, S. A.; Larson, T. J.; Ehernberger, L. J.

    1984-01-01

    During the highly maneuverable aircraft technology (HiMAT) flight test program recently completed at NASA Ames Research Center's Dryden Flight Research Facility, numerous problems were experienced in airspeed calibration. This necessitated the use of state reconstruction techniques to arrive at a position-error calibration. For the HiMAT aircraft, most of the calibration effort was expended on flights in which the air data pressure transducers were not performing accurately. Following discovery of this problem, the air data transducers of both aircraft were wrapped in heater blankets to correct the problem. Additional calibration flights were performed, and from the resulting data a satisfactory position-error calibration was obtained. This calibration and data obtained before installation of the heater blankets were used to develop an alternate calibration method. The alternate approach took advantage of high-quality inertial data that was readily available. A linearized Kalman filter (LKF) was used to reconstruct the aircraft's wind-relative trajectory; the trajectory was then used to separate transducer measurement errors from the aircraft position error. This calibration method is accurate and inexpensive. The LKF technique has an inherent advantage of requiring that no flight maneuvers be specially designed for airspeed calibrations. It is of particular use when the measurements of the wind-relative quantities are suspected to have transducer-related errors.

  11. Optical Fiber Infrasound Sensor Arrays: An Improved Alternative to Arrays of Rosette Wind Filters

    NASA Astrophysics Data System (ADS)

    Walker, Kristoffer; Zumberge, Mark; Dewolf, Scott; Berger, Jon; Hedlin, Michael

    2010-05-01

    A key difficulty in infrasound signal detection is the noise created by spatially incoherent turbulence that is usually present in wind. Increasing wind speeds correlate with increasing noise levels across the entire infrasound band. Optical fiber infrasound sensors (OFIS) are line microphones that instantaneously integrate pressure along their lengths with laser interferometry. Although the sensor has a very low noise floor, the promise of the sensor is in its effectiveness at reducing wind noise without the need for a network of interconnected pipes. We have previously shown that a single 90 m OFIS (spanning a line) is just as effective at reducing wind noise as a 70 m diameter rosette (covering a circular area). We have also empirically measured the infrasound response of the OFIS as a function of back azimuth, showing that it is well predicted by an analytical solution; the response is flat for broadside signals and similar to the rosette response for endfire signals. Using that analytical solution, we have developed beamforming techniques that permit the estimation of back azimuth using an array of OFIS arms as well as an array deconvolution technique that accurately stacks weighted versions of the recordings to obtain the original infrasound signal. We show how a slight modification to traditional array processing techniques can also be used with OFIS arrays to determine back azimuth, even for signal-to-noise ratios much less than 1. Recently several improvements to the OFIS instrumentation have been achieved. We have made an important modification to our interferometric technique that makes the interferometer insensitive to ambient temperature fluctuation. We are also developing a continuous real-time calibration system, which may eliminate the need for periodic array calibration efforts. We also report progress in comparing a newly installed 270 m long OFIS at Piñon Flat Observatory (PFO) to a collocated 70 m rosette of the I57US array. Specifically, we compare hundreds of wind noise spectra and two Vandenberg rocket launch infrasound signals that were recorded by both systems. The 70-m diameter rosette (L2) was connected to a Chaparral Physics Model 50 microphone, which is usually more sensitive than the MB2000 microbarometer in the 1-10 Hz band. The data show that in low wind, the noise floor of the OFIS is the same as the Chaparral. However, in moderate wind (5 m/s) the OFIS attenuates wind noise at 1 Hz by 10 dB better than L2. Similarly, the two rocket launch signals that were recorded in the presence of 3-4 m/s wind confirm that the signal-to-noise ratio improvement is 10 dB at 1 Hz. This confirms that at each signal frequency and direction, there exists an OFIS length threshold above which an OFIS wind filter will always outperform a rosette in terms recorded signal-to-noise ratio. The OFIS technology is proven and mature for observatory installations. Work is underway to make the technology more portable for remote, DC-powered deployments. A DC-powered, ruggedized OFIS array will be installed for microbarom research in Northern California during the spring of 2010. We seek collaborations with other researchers that are interested in evaluating or assisting in the further development of the OFIS technology.

  12. Calibration and comparison of the NASA Lewis free-piston Stirling engine model predictions with RE-1000 test data

    NASA Technical Reports Server (NTRS)

    Geng, Steven M.

    1987-01-01

    A free-piston Stirling engine performance code is being upgraded and validated at the NASA Lewis Research Center under an interagency agreement between the Department of Energy's Oak Ridge National Laboratory and NASA Lewis. Many modifications were made to the free-piston code in an attempt to decrease the calibration effort. A procedure was developed that made the code calibration process more systematic. Engine-specific calibration parameters are often used to bring predictions and experimental data into better agreement. The code was calibrated to a matrix of six experimental data points. Predictions of the calibrated free-piston code are compared with RE-1000 free-piston Stirling engine sensitivity test data taken at NASA Lewis. Reasonable agreement was obtained between the code prediction and the experimental data over a wide range of engine operating conditions.

  13. Calibration and comparison of the NASA Lewis free-piston Stirling engine model predictions with RE-1000 test data

    NASA Technical Reports Server (NTRS)

    Geng, Steven M.

    1987-01-01

    A free-piston Stirling engine performance code is being upgraded and validated at the NASA Lewis Research Center under an interagency agreement between the Department of Energy's Oak Ridge National Laboratory and NASA Lewis. Many modifications were made to the free-piston code in an attempt to decrease the calibration effort. A procedure was developed that made the code calibration process more systematic. Engine-specific calibration parameters are often used to bring predictions and experimental data into better agreement. The code was calibrated to a matrix of six experimental data points. Predictions of the calibrated free-piston code are compared with RE-1000 free-piston Stirling engine sensitivity test data taken at NASA Lewis. Resonable agreement was obtained between the code predictions and the experimental data over a wide range of engine operating conditions.

  14. Omega Dante soft x-ray power diagnostic component calibration at the National Synchrotron Light Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, K.M.; Weber, F.A.; Dewald, E.L.

    2004-10-01

    The Dante soft x-ray spectrometer, installed on the Omega laser facility at the Laboratory for Laser Energetics, University of Rochester, is a 12-channel filter-edge defined soft x-ray power diagnostic. It is used to measure the spectrally resolved, absolute flux from direct drive, indirect drive (hohlraums) and other plasma sources. Dante component calibration efforts using two beam lines, U3C (50 eV-1 keV) and X8A (1-6 keV) at the National Synchrotron Light Source have been implemented to improve the accuracy of these measurements. We have calibrated metallic vacuum x-ray diodes, mirrors and filters.

  15. A hydroponic design for microgravity and gravity installations

    NASA Technical Reports Server (NTRS)

    Fielder, Judith; Leggett, Nickolaus

    1990-01-01

    A hydroponic system is presented that is designed for use in microgravity or gravity experiments. The system uses a sponge-like growing medium installed in tubular modules. The modules contain the plant roots and manage the flow of the nutrient solution. The physical design and materials considerations are discussed, as are modifications of the basic design for use in microgravity or gravity experiments. The major external environmental requirements are also presented.

  16. 40 CFR 60.2200 - What information must I submit following my initial performance test?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 60.2115. (c) If you are using a fabric filter to comply with the emission limitations, documentation that a bag leak detection system has been installed and is being operated, calibrated, and maintained...

  17. 40 CFR 60.2200 - What information must I submit following my initial performance test?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 60.2115. (c) If you are using a fabric filter to comply with the emission limitations, documentation that a bag leak detection system has been installed and is being operated, calibrated, and maintained...

  18. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provide output of relative or absolute particulate matter loadings. (5) The bag leak detection system must..., repairs, calibration checks, and zero and span adjustments, emissions data must be obtained by using other...

  19. 40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system sensor must provide output of relative or absolute particulate matter loadings. (5) The bag leak..., repairs, calibration checks and zero and span adjustments, you must collect emissions data by using other...

  20. Optics-Only Calibration of a Neural-Net Based Optical NDE Method for Structural Health Monitoring

    NASA Technical Reports Server (NTRS)

    Decker, Arthur J.

    2004-01-01

    A calibration process is presented that uses optical measurements alone to calibrate a neural-net based NDE method. The method itself detects small changes in the vibration mode shapes of structures. The optics-only calibration process confirms previous work that the sensitivity to vibration-amplitude changes can be as small as 10 nanometers. A more practical value in an NDE service laboratory is shown to be 50 nanometers. Both model-generated and experimental calibrations are demonstrated using two implementations of the calibration technique. The implementations are based on previously published demonstrations of the NDE method and an alternative calibration procedure that depends on comparing neural-net and point sensor measurements. The optics-only calibration method, unlike the alternative method, does not require modifications of the structure being tested or the creation of calibration objects. The calibration process can be used to test improvements in the NDE process and to develop a vibration-mode-independence of damagedetection sensitivity. The calibration effort was intended to support NASA s objective to promote safety in the operations of ground test facilities or aviation safety, in general, by allowing the detection of the gradual onset of structural changes and damage.

  1. Using Advanced Tensiometers to Monitor Temporal Variations in Pore Pressure

    NASA Astrophysics Data System (ADS)

    Nichols, R. L.; Young, M. H.; Dixon, K. L.; Rossabi, J.; Hyde, W. K.; Holmes-Burns, H.

    2002-12-01

    The Savannah River Site has installed a comprehensive vadose zone monitoring system (VZMS) at it's low level radioactive waste disposal facility to collect the necessary information to calculate contaminant flux. The VZMS includes water content reflectometers, suction lysimeters, advanced tensiometers (ATs), water flux meters, access ports for neutron probes, and a tipping bucket rain gauge. Forty one ATs were installed from 1999 to 2001 at depths ranging from 2 to 60 feet and have been operated continuously. The installation depths were based on a hydrostatigraphic model developed from core logs, cone penetrometer logs, moisture content profiles, water retention curves model that were obtained during the phased installation of the VZMS. An AT consists of a porous cup installed at a prescribed depth with casing back to the surface and a pressure transducer that is lowered into the casing and connects with the porous cup. The pressure transducer transmits it's signal to a datalogger where the data is stored for future retrieval using a cellular phone communications package. Results from the 2 year operating period show that the AT calibrations are stable and t ATs are capable of extended monitoring of pore pressures in the 0 to 300 cm H2 O range. The ATs had sufficient resolution to detect the naturally occurring fluctuations in pore pressure (1 to 100 cm H2 O over 1 to 72 hours) that resulted from infiltration events at the site. The stable performance of the ATs combined with their ability to detect naturally occurring fluctuations in pore pressure make the ATs a useful tool in measuring temporal pore pressure variations for use in calibrating numerical models of fluid flow in variably saturated porous media.

  2. The 2005 HST Calibration Workshop Hubble After the Transition to Two-Gyro Mode

    NASA Technical Reports Server (NTRS)

    Koekemoer, Anton M. (Editor); Goodfrooij, Paul (Editor); Dressel, Linda L. (Editor)

    2006-01-01

    The 2005 HST Calibration Workshop was held at the Space Telescope Science Institute during October 26, 2005 to bring together members of the observing community, the instrument development teams, and the STScI instrument support teams to share information and techniques. Presentations included the two-gyro performance of HST and FGS, advances in the calibration of a number of instruments, the results of other instruments after their return from space, and the status of still others which are scheduled for installation during the next servicing mission. Cross-calibration between HST and JWST was discussed, as well as the new Guide Star Catalog and advances in data analysis software. This book contains the published record of the workshop, while all the talks and posters are available electronically on the workshop Web site.

  3. Modifications of steam condensation model implemented in commercial solver

    NASA Astrophysics Data System (ADS)

    Sova, Libor; Jun, Gukchol; ŠÅ¥astný, Miroslav

    2017-09-01

    Nucleation theory and droplet grow theory and methods how they are incorporated into numerical solvers are crucial factors for proper wet steam modelling. Unfortunately, they are still covered by cloud of uncertainty and therefore some calibration of these models according to reliable experimental results is important for practical analyses of steam turbines. This article demonstrates how is possible to calibrate wet steam model incorporated into commercial solver ANSYS CFX.

  4. WE-D-9A-06: Open Source Monitor Calibration and Quality Control Software for Enterprise Display Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bevins, N; Vanderhoek, M; Lang, S

    2014-06-15

    Purpose: Medical display monitor calibration and quality control present challenges to medical physicists. The purpose of this work is to demonstrate and share experiences with an open source package that allows for both initial monitor setup and routine performance evaluation. Methods: A software package, pacsDisplay, has been developed over the last decade to aid in the calibration of all monitors within the radiology group in our health system. The software is used to calibrate monitors to follow the DICOM Grayscale Standard Display Function (GSDF) via lookup tables installed on the workstation. Additional functionality facilitates periodic evaluations of both primary andmore » secondary medical monitors to ensure satisfactory performance. This software is installed on all radiology workstations, and can also be run as a stand-alone tool from a USB disk. Recently, a database has been developed to store and centralize the monitor performance data and to provide long-term trends for compliance with internal standards and various accrediting organizations. Results: Implementation and utilization of pacsDisplay has resulted in improved monitor performance across the health system. Monitor testing is now performed at regular intervals and the software is being used across multiple imaging modalities. Monitor performance characteristics such as maximum and minimum luminance, ambient luminance and illuminance, color tracking, and GSDF conformity are loaded into a centralized database for system performance comparisons. Compliance reports for organizations such as MQSA, ACR, and TJC are generated automatically and stored in the same database. Conclusion: An open source software solution has simplified and improved the standardization of displays within our health system. This work serves as an example method for calibrating and testing monitors within an enterprise health system.« less

  5. Installation of a second superconducting wiggler at SAGA-LS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of themore » vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.« less

  6. Tests and Techniques for Characterizing and Modeling X-43A Electromechanical Actuators

    NASA Technical Reports Server (NTRS)

    Lin, Yohan; Baumann, Ethan; Bose, David M.; Beck, Roger; Jenney, Gavin

    2008-01-01

    A series of tests were conducted on the electromechanical actuators of the X-43A research vehicle in preparation for the Mach 7 and 10 hypersonic flights. The tests were required to help validate the actuator models in the simulation and acquire a better understanding of the installed system characteristics. Static and dynamic threshold, multichannel crosstalk, command-to-surface timing, free play, voltage regeneration, calibration, frequency response, compliance, hysteretic damping, and aircraft-in-the-loop tests were performed as part of this effort. This report describes the objectives, configurations, and methods for those tests, as well as the techniques used for developing second-order actuator models from the test results. When the first flight attempt failed because of actuator problems with the launch vehicle, further analysis and model enhancements were performed as part of the return-to-flight activities. High-fidelity models are described, along with the modifications that were required to match measurements taken from the research vehicle. Problems involving the implementation of these models into the X-43A simulation are also discussed. This report emphasizes lessons learned from the actuator testing, simulation modeling, and integration efforts for the X-43A hypersonic research vehicle.

  7. Automated Scalable Heat Shock Modification for Standard Aquatic Housing Systems.

    PubMed

    Saera-Vila, Alfonso; Kish, Phillip E; Kahana, Alon

    2015-08-01

    Heat shock is a common technique for inducible gene expression system in a variety of organisms. Heat shock treatment of adult zebrafish is more involved and generally consists of manually transferring fish between housing rack tanks and preheated water tanks or the use of timed heaters in stand-alone aquaria. To avoid excessive fish handling and to take advantage of the continuous flow of a standard housing rack, proposed modifications consisted of installing an aquarium heater inside each tank, manually setting the heater to reach heat shocking temperatures (> 37°C) and, after that, testing that every tank responded equally. To address the limitations in the existing systems, we developed a novel modification of standard zebrafish housing racks to perform heat shock treatment in conditions of continuous water flow. By adding an extra manifold to the housing rack and connecting it to a recirculating bath to create a parallel water flow system, we can increase the temperature from standard conditions (28.5°C) to heat shock conditions with high precision (38.0-38.3°C, mean ± SD = 38.1°C ± 0.14°C) and minimal variation among experimental tanks (coefficient of variation [CV] = 0.04%). This means that there is virtually no need for laborious pretreatment calibrations or continuous adjustments to minimize intertank variation. To test the effectiveness of our design, we utilized this system to induce enhanced green fluorescent protein (EGFP) expression in hsp70-EGFP fish and performed a fin regeneration experiment with hsp70l:dnfgfr1-EGFP fish to confirm that heat-induced gene expression reached physiological levels. In summary, our newly described aquatic heat shock system minimizes effort during heat shock experiments, while ensuring the best water quality and fish welfare and facilitating large heat shock settings or the use of multiple transgenic lines for both research and teaching experiments.

  8. Automated Scalable Heat Shock Modification for Standard Aquatic Housing Systems

    PubMed Central

    Saera-Vila, Alfonso; Kish, Phillip E.

    2015-01-01

    Abstract Heat shock is a common technique for inducible gene expression system in a variety of organisms. Heat shock treatment of adult zebrafish is more involved and generally consists of manually transferring fish between housing rack tanks and preheated water tanks or the use of timed heaters in stand-alone aquaria. To avoid excessive fish handling and to take advantage of the continuous flow of a standard housing rack, proposed modifications consisted of installing an aquarium heater inside each tank, manually setting the heater to reach heat shocking temperatures (>37°C) and, after that, testing that every tank responded equally. To address the limitations in the existing systems, we developed a novel modification of standard zebrafish housing racks to perform heat shock treatment in conditions of continuous water flow. By adding an extra manifold to the housing rack and connecting it to a recirculating bath to create a parallel water flow system, we can increase the temperature from standard conditions (28.5°C) to heat shock conditions with high precision (38.0–38.3°C, mean±SD=38.1°C±0.14°C) and minimal variation among experimental tanks (coefficient of variation [CV]=0.04%). This means that there is virtually no need for laborious pretreatment calibrations or continuous adjustments to minimize intertank variation. To test the effectiveness of our design, we utilized this system to induce enhanced green fluorescent protein (EGFP) expression in hsp70-EGFP fish and performed a fin regeneration experiment with hsp70l:dnfgfr1-EGFP fish to confirm that heat-induced gene expression reached physiological levels. In summary, our newly described aquatic heat shock system minimizes effort during heat shock experiments, while ensuring the best water quality and fish welfare and facilitating large heat shock settings or the use of multiple transgenic lines for both research and teaching experiments. PMID:25942613

  9. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. 40 CFR 60.153 - Monitoring of operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) The owner or operator of any multiple hearth, fluidized bed, or electric sludge incinerator subject to...) Install, calibrate, maintain and operate temperature measuring devices at every hearth in multiple hearth... zones of electric incinerators. For multiple hearth furnaces, a minimum of one temperature measuring...

  11. 21 CFR 1271.200 - Equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... prevent the introduction, transmission, or spread of communicable diseases, equipment used in the manufacture of HCT/Ps must be of appropriate design for its use and must be suitably located and installed to... result in the introduction, transmission, or spread of communicable diseases. (c) Calibration of...

  12. 21 CFR 1271.200 - Equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... prevent the introduction, transmission, or spread of communicable diseases, equipment used in the manufacture of HCT/Ps must be of appropriate design for its use and must be suitably located and installed to... result in the introduction, transmission, or spread of communicable diseases. (c) Calibration of...

  13. 21 CFR 1271.200 - Equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... prevent the introduction, transmission, or spread of communicable diseases, equipment used in the manufacture of HCT/Ps must be of appropriate design for its use and must be suitably located and installed to... result in the introduction, transmission, or spread of communicable diseases. (c) Calibration of...

  14. 21 CFR 1271.200 - Equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... prevent the introduction, transmission, or spread of communicable diseases, equipment used in the manufacture of HCT/Ps must be of appropriate design for its use and must be suitably located and installed to... result in the introduction, transmission, or spread of communicable diseases. (c) Calibration of...

  15. Calibration and simulation of two large wastewater treatment plants operated for nutrient removal.

    PubMed

    Ferrer, J; Morenilla, J J; Bouzas, A; García-Usach, F

    2004-01-01

    Control and optimisation of plant processes has become a priority for WWTP managers. The calibration and verification of a mathematical model provides an important tool for the investigation of advanced control strategies that may assist in the design or optimization of WWTPs. This paper describes the calibration of the ASM2d model for two full scale biological nitrogen and phosphorus removal plants in order to characterize the biological process and to upgrade the plants' performance. Results from simulation showed a good correspondence with experimental data demonstrating that the model and the calibrated parameters were able to predict the behaviour of both WWTPs. Once the calibration and simulation process was finished, a study for each WWTP was done with the aim of improving its performance. Modifications focused on reactor configuration and operation strategies were proposed.

  16. KSC-05pd2533

    NASA Image and Video Library

    2005-11-30

    KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility Bay 2, United Space Alliance technician Michael Vanwart installs thermal protection system blankets in the nose cap of space shuttle Endeavour. Endeavour recently came out of a nearly two-year Orbiter Major Modification period which began in December 2003. Engineers and technicians spent 900,000 hours performing 124 modifications to the vehicle. These included all recommended return-to-flight safety modifications, bonding more than 1,000 thermal protection system tiles and inspecting more than 150 miles of wiring throughout the orbiter. Shuttle major modification periods are scheduled at regular intervals to enhance safety and performance, infuse new technology, and allow for thorough inspections of the airframe and wiring of the vehicles. This was the second of these modification periods performed entirely at Kennedy Space Center. Endeavour's previous modification was completed in March 1997.

  17. KSC-05pd2531

    NASA Image and Video Library

    2005-11-30

    KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 2, United Space Alliance technician Michael Vanwart prepares to install thermal protection system blankets in the nose cap of space shuttle Endeavour. Endeavour recently came out of a nearly two-year Orbiter Major Modification period which began in December 2003. Engineers and technicians spent 900,000 hours performing 124 modifications to the vehicle. These included all recommended return-to-flight safety modifications, bonding more than 1,000 thermal protection system tiles and inspecting more than 150 miles of wiring throughout the orbiter. Shuttle major modification periods are scheduled at regular intervals to enhance safety and performance, infuse new technology, and allow for thorough inspections of the airframe and wiring of the vehicles. This was the second of these modification periods performed entirely at Kennedy Space Center. Endeavour's previous modification was completed in March 1997.

  18. KSC-05pd2532

    NASA Image and Video Library

    2005-11-30

    KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility Bay 2, United Space Alliance technician Michael Vanwart installs thermal protection system blankets in the nose cap of space shuttle Endeavour. Endeavour recently came out of a nearly two-year Orbiter Major Modification period which began in December 2003. Engineers and technicians spent 900,000 hours performing 124 modifications to the vehicle. These included all recommended return-to-flight safety modifications, bonding more than 1,000 thermal protection system tiles and inspecting more than 150 miles of wiring throughout the orbiter. Shuttle major modification periods are scheduled at regular intervals to enhance safety and performance, infuse new technology, and allow for thorough inspections of the airframe and wiring of the vehicles. This was the second of these modification periods performed entirely at Kennedy Space Center. Endeavour's previous modification was completed in March 1997.

  19. Frequency analysis of a step dynamic pressure calibrator.

    PubMed

    Choi, In-Mook; Yang, Inseok; Yang, Tae-Heon

    2012-09-01

    A dynamic high pressure standard is becoming more essential in the fields of mobile engines, space science, and especially the area of defense such as long-range missile development. However, a complication arises when a dynamic high pressure sensor is compared with a reference dynamic pressure gauge calibrated in static mode. Also, it is difficult to determine a reference dynamic pressure signal from the calibrator because a dynamic high pressure calibrator generates unnecessary oscillations in a positive-going pressure step method. A dynamic high pressure calibrator, using a quick-opening ball valve, generates a fast step pressure change within 1 ms; however, the calibrator also generates a big impulse force that can lead to a short life-time of the system and to oscillating characteristics in response to the dynamic sensor to be calibrated. In this paper, unnecessary additional resonant frequencies besides those of the step function are characterized using frequency analysis. Accordingly, the main sources of resonance are described. In order to remove unnecessary frequencies, the post processing results, obtained by a filter, are given; also, a method for the modification of the dynamic calibration system is proposed.

  20. Frequency analysis of a step dynamic pressure calibrator

    NASA Astrophysics Data System (ADS)

    Choi, In-Mook; Yang, Inseok; Yang, Tae-Heon

    2012-09-01

    A dynamic high pressure standard is becoming more essential in the fields of mobile engines, space science, and especially the area of defense such as long-range missile development. However, a complication arises when a dynamic high pressure sensor is compared with a reference dynamic pressure gauge calibrated in static mode. Also, it is difficult to determine a reference dynamic pressure signal from the calibrator because a dynamic high pressure calibrator generates unnecessary oscillations in a positive-going pressure step method. A dynamic high pressure calibrator, using a quick-opening ball valve, generates a fast step pressure change within 1 ms; however, the calibrator also generates a big impulse force that can lead to a short life-time of the system and to oscillating characteristics in response to the dynamic sensor to be calibrated. In this paper, unnecessary additional resonant frequencies besides those of the step function are characterized using frequency analysis. Accordingly, the main sources of resonance are described. In order to remove unnecessary frequencies, the post processing results, obtained by a filter, are given; also, a method for the modification of the dynamic calibration system is proposed.

  1. Servo Controlled Variable Pressure Modification to Space Shuttle Hydraulic Pump

    NASA Technical Reports Server (NTRS)

    Kouns, H. H.

    1983-01-01

    Engineering drawings show modifications made to the constant pressure control of the model AP27V-7 hydraulic pump to an electrically controlled variable pressure setting compensator. A hanger position indicator was included for continuously monitoring hanger angle. A simplex servo driver was furnished for controlling the pressure setting servovalve. Calibration of the rotary variable displacement transducer is described as well as pump performance and response characteristics.

  2. RELIABILITY TESTING OF AN ON-HARVESTER COTTON WEIGHT MEASUREMENT SYSTEM

    USDA-ARS?s Scientific Manuscript database

    A system for weighing seed cotton onboard stripper harvesters was developed and installed on several producer owned and operated machines. The weight measurement system provides critical information to producers when in the process of calibrating yield monitors or conducting on-farm research. The ...

  3. Examples of Mesh and NURBS modelling for in vivo lung counting studies.

    PubMed

    Farah, Jad; Broggio, David; Franck, Didier

    2011-03-01

    Realistic calibration coefficients for in vivo counting installations are assessed using voxel phantoms and Monte Carlo calculations. However, voxel phantoms construction is time consuming and their flexibility extremely limited. This paper involves Mesh and non-uniform rational B-splines graphical formats, of greater flexibility, to optimise the calibration of in vivo counting installations. Two studies validating the use of such phantoms and involving geometry deformation and modelling were carried out to study the morphologic effect on lung counting efficiency. The created 3D models fitted with the reference ones, with volumetric differences of <5 %. Moreover, it was found that counting efficiency varies with the inverse of lungs' volume and that the latter primes when compared with chest wall thickness. Finally, a series of different thoracic female phantoms of various cup sizes, chest girths and internal organs' volumes were created starting from the International Commission on Radiological Protection (ICRP) adult female reference computational phantom to give correction factors for the lung monitoring of female workers.

  4. Data reduction of digitized images processed from calibrated photographic and spectroscopic films obtained from terrestial, rocket and space shuttle telescopic instruments

    NASA Technical Reports Server (NTRS)

    Hammond, Ernest C., Jr.

    1990-01-01

    The Microvax 2 computer, the basic software in VMS, and the Mitsubishi High Speed Disk were received and installed. The digital scanning tunneling microscope is fully installed and operational. A new technique was developed for pseudocolor analysis of the line plot images of a scanning tunneling microscope. Computer studies and mathematical modeling of the empirical data associated with many of the film calibration studies were presented. A gas can follow-up experiment which will be launched in September, on the Space Shuttle STS-50, was prepared and loaded. Papers were presented on the structure of the human hair strand using scanning electron microscopy and x ray analysis and updated research on the annual rings produced by the surf clam of the ocean estuaries of Maryland. Scanning electron microscopic work was conducted by the research team for the study of the Mossbauer and Magnetic Susceptibility Studies on NmNi(4.25)Fe(.85) and its Hydride.

  5. 47 CFR 73.875 - Modification of transmission systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... test operations at the full authorized ERP may commence immediately upon installation pursuant to § 73... the transmitter operating power (TPO) from the authorized value, but not the ERP, must be reported in...

  6. KSC-2013-3550

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician installs a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  7. KSC-2013-3556

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician completes the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  8. KSC-2013-3552

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician installs a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  9. KSC-2013-3553

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in the Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  10. KSC-2013-3555

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- The installation of new bearings on crawler-transporter 2 is underway in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  11. KSC-2013-3549

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  12. KSC-2013-3554

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- The installation of new bearings on crawler-transporter 2 is underway in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  13. KSC-2013-3559

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Steady progress is made on the installation of new bearings on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  14. KSC-2013-3558

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician completes the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  15. KSC-2013-3557

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians complete the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  16. KSC-2013-3551

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  17. KSC-2013-3548

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Preparations are underway to install new bearings on crawler-transporter 2 in the Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  18. The 32-GHz performance of the DSS-14 70-meter antenna: 1989 configuration

    NASA Technical Reports Server (NTRS)

    Gatti, M. S.; Klein, M. J.; Kuiper, T. B. H.

    1989-01-01

    The results of preliminary 32 GHz calibrations of the 70 meter antenna at Goldstone are presented. Measurements were done between March and July 1989 using Virgo A and Venus as the primary efficiency calibrators. The flux densites of theses radio sources at 32 GHz are not known with high accuracy, but were extrapolated from calibrated data at lower frequencies. The measured value of efficiency (0.35) agreed closely with the predicted value (0.32), and the results are very repeatable. Flux densities of secondary sources used in the observations were subsequently derived. These measurements were performed using a beamswitching radiometer that employed an uncooled high-electron mobility transistor (HEMT) low-noise amplifier. This system was installed primarily to determine the performance of the antenna in its 1989 configuration, but the experience will also aid in successful future calibration of the Deep Space Network (DSN) at this frequency.

  19. Long Term Uncertainty Investigations of 1 MN Force Calibration Machine at NPL, India (NPLI)

    NASA Astrophysics Data System (ADS)

    Kumar, Rajesh; Kumar, Harish; Kumar, Anil; Vikram

    2012-01-01

    The present paper is an attempt to study the long term uncertainty of 1 MN hydraulic multiplication system (HMS) force calibration machine (FCM) at the National Physical Laboratory, India (NPLI), which is used for calibration of the force measuring instruments in the range of 100 kN - 1 MN. The 1 MN HMS FCM was installed at NPLI in 1993 and was built on the principle of hydraulic amplifications of dead weights. The best measurement capability (BMC) of the machine is ± 0.025% (k = 2) and it is traceable to national standards by means of precision force transfer standards (FTS). The present study discusses the uncertainty variations of the 1 MN HMS FCM over the years and describes the other parameters in detail, too. The 1 MN HMS FCM was calibrated in the years 2004, 2006, 2007, 2008, 2009 and 2010 and the results have been reported.

  20. Design and simulation of a sensor for heliostat field closed loop control

    NASA Astrophysics Data System (ADS)

    Collins, Mike; Potter, Daniel; Burton, Alex

    2017-06-01

    Significant research has been completed in pursuit of capital cost reductions for heliostats [1],[2]. The camera array closed loop control concept has potential to radically alter the way heliostats are controlled and installed by replacing high quality open loop targeting systems with low quality targeting devices that rely on measurement of image position to remove tracking errors during operation. Although the system could be used for any heliostat size, the system significantly benefits small heliostats by reducing actuation costs, enabling large numbers of heliostats to be calibrated simultaneously, and enabling calibration of heliostats that produce low irradiance (similar or less than ambient light images) on Lambertian calibration targets, such as small heliostats that are far from the tower. A simulation method for the camera array has been designed and verified experimentally. The simulation tool demonstrates that closed loop calibration or control is possible using this device.

  1. Aircraft modifications: Assessing the current state of Air Force aircraft modifications and the implications for future military capability

    NASA Astrophysics Data System (ADS)

    Hill, Owen Jacob

    How prepared is the U.S. Air Force to modify its aircraft fleet in upcoming years? Aircraft modernization is a complex interaction of new and legacy aircraft, organizational structure, and planning policy. This research will take one component of modernization: aircraft modification, and apply a new method of analysis in order to help formulate policy to promote modernization. Departing from previous small-sample studies dependent upon weight as a chief explanatory variable, this dissertation incorporates a comprehensive dataset that was constructed for this research of all aircraft modifications from 1996 through 2005. With over 700 modification programs, this dataset is used to examine changes to the current modification policy using policy-response regression models. These changes include separating a codependent procurement and installation schedule, reducing the documentation requirements for safety modifications, and budgeting for aging aircraft modifications. The research then concludes with predictive models for the F-15 and F-16 along with their replacements: the F-22 and F-35 Joint Strike Fighter.

  2. Towards better GNSS observations at the new IGS reference station BRUX: multipath mitigation and individual antenna calibration

    NASA Astrophysics Data System (ADS)

    Aerts, W.; Baire, Q.; Bruyninx, C.; Legrand, J.; Pottiaux, E.

    2012-12-01

    A new multi-GNSS IGS reference station, BRUX, has been installed at Brussels. It replaces the former IGS reference station BRUS, which had to be dismantled because of construction works. The antenna of BRUX is sited on top of a telescope dome. Although this might be an unfortunate choice from an electromagnetic point of view, the siting is very convenient for other reasons. Being close to the time lab hosting the atomic clocks, the cable length is within acceptable and affordable limits, both for cost and signal loss reasons. Moreover, the site offers open sky view, which can indeed be expected from a former telescope siting. The dome is entirely metal, hence shielding of the dome was required in order to mitigate multipath propagation. This was achieved using a metal shield topped with RF absorbing material and respecting a certain antenna-to-absorber spacing in order not to alter the antenna phase center offset (PCO) and variations (PCVs) too much. This would otherwise render the individual calibration of the antenna, in an anechoic chamber in the case of BRUX, invalid. But even taking all precautions, the PCO and PCVs of the calibration do not exactly equal those after installation. Moreover, different calibrations, in an anechoic chamber and by an outdoor robot, of the same antenna have shown to result in PCO and PCVs that differ up to several mm at certain azimuths and elevations. A test set-up with 6 such redundantly calibrated GNSS antennas revealed that the calibration differences can reach 8 mm on the ionosphere-free frequency, which amplifies the calibration differences by a factor three compared to L1 and L2 only. The use of different receiver antenna calibration models can impact position at almost the centimeter level. In an attempt to align the historical time series for BRUS with the (future) data for BRUX, the tie between the new station BRUX and the old IGS station BRUS was determined using terrestrial measurements as well as GPS. In the case of GPS, several L1, L2 and ionosphere-free baseline measurements were performed using state-of-the-art type-mean receiver antenna calibrations as well as individual calibrations. Differences between the different GPS measurements are several mm, while the differences between the terrestrial tie and the GPS ties reaches almost the cm-level. One contribution to the error budget is the absence of an individual calibration for the BRUS antenna, another one is the difference in PCO and PCVs on site, as opposed to at calibration, as already mentioned.

  3. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. Dynamic Calibration and Verification Device of Measurement System for Dynamic Characteristic Coefficients of Sliding Bearing

    PubMed Central

    Chen, Runlin; Wei, Yangyang; Shi, Zhaoyang; Yuan, Xiaoyang

    2016-01-01

    The identification accuracy of dynamic characteristics coefficients is difficult to guarantee because of the errors of the measurement system itself. A novel dynamic calibration method of measurement system for dynamic characteristics coefficients is proposed in this paper to eliminate the errors of the measurement system itself. Compared with the calibration method of suspension quality, this novel calibration method is different because the verification device is a spring-mass system, which can simulate the dynamic characteristics of sliding bearing. The verification device is built, and the calibration experiment is implemented in a wide frequency range, in which the bearing stiffness is simulated by the disc springs. The experimental results show that the amplitude errors of this measurement system are small in the frequency range of 10 Hz–100 Hz, and the phase errors increase along with the increasing of frequency. It is preliminarily verified by the simulated experiment of dynamic characteristics coefficients identification in the frequency range of 10 Hz–30 Hz that the calibration data in this frequency range can support the dynamic characteristics test of sliding bearing in this frequency range well. The bearing experiments in greater frequency ranges need higher manufacturing and installation precision of calibration device. Besides, the processes of calibration experiments should be improved. PMID:27483283

  5. Experimental Results of Site Calibration and Sensitivity Measurements in OTR for UWB Systems

    NASA Astrophysics Data System (ADS)

    Viswanadham, Chandana; Rao, P. Mallikrajuna

    2017-06-01

    System calibration and parameter accuracy measurement of electronic support measures (ESM) systems is a major activity, carried out by electronic warfare (EW) engineers. These activities are very critical and needs good understanding in the field of microwaves, antennas, wave propagation, digital and communication domains. EW systems are broad band, built with state-of-the art electronic hardware, installed on different varieties of military platforms to guard country's security from time to time. EW systems operate in wide frequency ranges, typically in the order of thousands of MHz, hence these are ultra wide band (UWB) systems. Few calibration activities are carried within the system and in the test sites, to meet the accuracies of final specifications. After calibration, parameters are measured for their accuracies either in feed mode by injecting the RF signals into the front end or in radiation mode by transmitting the RF signals on to system antenna. To carry out these activities in radiation mode, a calibrated open test range (OTR) is necessary in the frequency band of interest. Thus site calibration of OTR is necessary to be carried out before taking up system calibration and parameter measurements. This paper presents the experimental results of OTR site calibration and sensitivity measurements of UWB systems in radiation mode.

  6. Towards System Calibration of Panoramic Laser Scanners from a Single Station

    PubMed Central

    Medić, Tomislav; Holst, Christoph; Kuhlmann, Heiner

    2017-01-01

    Terrestrial laser scanner measurements suffer from systematic errors due to internal misalignments. The magnitude of the resulting errors in the point cloud in many cases exceeds the magnitude of random errors. Hence, the task of calibrating a laser scanner is important for applications with high accuracy demands. This paper primarily addresses the case of panoramic terrestrial laser scanners. Herein, it is proven that most of the calibration parameters can be estimated from a single scanner station without a need for any reference information. This hypothesis is confirmed through an empirical experiment, which was conducted in a large machine hall using a Leica Scan Station P20 panoramic laser scanner. The calibration approach is based on the widely used target-based self-calibration approach, with small modifications. A new angular parameterization is used in order to implicitly introduce measurements in two faces of the instrument and for the implementation of calibration parameters describing genuine mechanical misalignments. Additionally, a computationally preferable calibration algorithm based on the two-face measurements is introduced. In the end, the calibration results are discussed, highlighting all necessary prerequisites for the scanner calibration from a single scanner station. PMID:28513548

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruzic, David N.; Andruczyk, Daniel

    The implementation of the liquid Lithium Divertor (LLD) in NSTX presented a unique opportunity in plasma-material interactions studies. A high density Langmuir Probe (HDLP) array utilizing a dense pack of triple Langmuir probes was built at PPPL and the electronics designed and built by UIUC. It was shown that the HDLP array could be used to characterize the modification of the EEDF during lithium experiments on NSTX as well as characterize the transient particle loads during lithium experiments as a means to study ELMs. With NSTX being upgraded and a new divertor being installed, the HDLP array will not bemore » used in NSTX-U. However UIUC is currently helping to develop two new systems for depositing lithium into NSTX-U, a Liquid Lithium Pellet Dripper (LLPD) for use with the granular injector for ELM mitigation and control studies as well as an Upward-Facing Lithium Evaporator (U-LITER) based on a flash evaporation system using an electron beam. Currently UIUC has Daniel Andruczyk Stationed at PPPL and is developing these systems as well as being involved in preparing the Materials Analysis Particle Probe (MAPP) for use in LTX and NSTX-U. To date the MAPP preparations have been completed. New sample holders were designed by UIUC?s Research Engineer at PPPL and manufactured at PPPL and installed. MAPP is currently being used on LTX to do calibration and initial studies. The LLPD has demonstrated that it can produce pellets. There is still some adjustments needed to control the frequency and particle size. Equipment for the U-LITER has arrived and initial test are being made of the electron beam and design of the U-LITER in progress. It is expected to have these ready for the first run campaign of NSTX-U.« less

  8. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1. Volume 2. Appendix J-M.

    DTIC Science & Technology

    1985-06-28

    1984 to April 1985 includedr installation of 27 raw mnitor wells and 11 amh l’,(1 zjit~s, collecticn cf seive~t, sarples ftw surfac , soil, shallowv...modifying a sampling and analytical program that addresses the requirements of the project. If project requirements necessitate different quality...reagent blank and at least five (5) different concentrations of thl analyte. A modification of the method of Hubaux and Vos will be used to deter

  9. Transponder-aided joint calibration and synchronization compensation for distributed radar systems.

    PubMed

    Wang, Wen-Qin

    2015-01-01

    High-precision radiometric calibration and synchronization compensation must be provided for distributed radar system due to separate transmitters and receivers. This paper proposes a transponder-aided joint radiometric calibration, motion compensation and synchronization for distributed radar remote sensing. As the transponder signal can be separated from the normal radar returns, it is used to calibrate the distributed radar for radiometry. Meanwhile, the distributed radar motion compensation and synchronization compensation algorithms are presented by utilizing the transponder signals. This method requires no hardware modifications to both the normal radar transmitter and receiver and no change to the operating pulse repetition frequency (PRF). The distributed radar radiometric calibration and synchronization compensation require only one transponder, but the motion compensation requires six transponders because there are six independent variables in the distributed radar geometry. Furthermore, a maximum likelihood method is used to estimate the transponder signal parameters. The proposed methods are verified by simulation results.

  10. Simulation Study of the Helical Superconducting Undulator Installation at the Advanced Photon Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sajaev, V.; Borland, M.; Sun, Y.

    A helical superconducting undulator is planned for installation at the APS. Such an installation would be first of its kind – helical devices were never installed in synchrotron light sources before. Due to its reduced horizontal aperture, a lattice modification is required to accommodate for large horizontal oscillations during injection. We describe the lattice change details and show the new lattice experimental test results. To understand the effect of the undulator on single-particle dynamics, first, its kick maps were computed using different methods. We have found that often-used Elleaume formula* for kick maps gives wrong results for this undulator. Wemore » then used the kick maps obtained by other methods to simulate the effect of the undulator on injection and lifetime.« less

  11. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. 40 CFR 63.365 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Volatile Alcohols in Water By Direct Aqueous-Injection Gas Chromatography, (incorporated by... be determined by either: (A) Weighing the ethylene oxide gas cylinder(s) used to charge the... mass of gas charged by the weight percent ethylene oxide present in the gas. (B) Installing calibrated...

  14. Void Fraction Instrument operation and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  15. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  16. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  17. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  18. Testing of a Microwave Blade Tip Clearance Sensor at the NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Woike, Mark R.; Roeder, James W.; Hughes, Christopher E.; Bencic, Timothy J.

    2009-01-01

    The development of new active tip clearance control and structural health monitoring schemes in turbine engines and other types of rotating machinery requires sensors that are highly accurate and can operate in a high-temperature environment. The use of a microwave sensor to acquire blade tip clearance and tip timing measurements is being explored at the NASA Glenn Research Center. The microwave blade tip clearance sensor works on principles that are very similar to a short-range radar system. The sensor sends a continuous microwave signal towards a target and measures the reflected signal. The phase difference of the reflected signal is directly proportional to the distance between the sensor and the target being measured. This type of sensor is beneficial in that it has the ability to operate at extremely high temperatures and is unaffected by contaminants that may be present in turbine engines. The use of microwave sensors for this application is a new concept. Techniques on calibrating the sensors along with installation effects are not well quantified as they are for other sensor technologies. Developing calibration techniques and evaluating installation effects are essential in using these sensors to make tip clearance and tip timing measurements. As a means of better understanding these issues, the microwave sensors were used on a benchtop calibration rig, a large axial vane fan, and a turbofan. Background on the microwave tip clearance sensor, an overview of their calibration, and the results from their use on the axial vane fan and the turbofan will be presented in this paper.

  19. Testing of a Microwave Blade Tip Clearance Sensor at the NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Woike, Mark R.; Roeder, James W.; Hughes, Christopher E.; Bencic, Timothy J.

    2009-01-01

    The development of new active tip clearance control and structural health monitoring schemes in turbine engines and other types of rotating machinery requires sensors that are highly accurate and can operate in a high temperature environment. The use of a microwave sensor to acquire blade tip clearance and tip timing measurements is being explored at the NASA Glenn Research Center. The microwave blade tip clearance sensor works on principles that are very similar to a short range radar system. The sensor sends a continuous microwave signal towards a target and measures the reflected signal. The phase difference of the reflected signal is directly proportional to the distance between the sensor and the target being measured. This type of sensor is beneficial in that it has the ability to operate at extremely high temperatures and is unaffected by contaminants that may be present in turbine engines. The use of microwave sensors for this application is a new concept. Techniques on calibrating the sensors along with installation effects are not well quantified as they are for other sensor technologies. Developing calibration techniques and evaluating installation effects are essential in using these sensors to make tip clearance and tip timing measurements. As a means of better understanding these issues, the microwave sensors were used on a bench top calibration rig, a large axial vane fan, and a turbofan. Background on the microwave tip clearance sensor, an overview of their calibration, and the results from their use on the axial vane fan and the turbofan will be presented in this paper.

  20. Laboratory Astrophysics Using a Microcalorimeter and Bragg Crystal Spectrometer on an Electron Beam Ion Trap

    NASA Technical Reports Server (NTRS)

    Brinton, John (Technical Monitor); Silver, Eric

    2005-01-01

    We completed modifications to the new microcalorimeter system dedicated for use on the EBIT at NIST, which included: 1) a redesign of the x-ray calibration source from a direct electron impact source to one that irradiates the microcalorimeter with fluorescent x-rays. The resulting calibration lines are free of bremsstrahlung background; 2) the microcalorimeter electronic circuit was significantly improved to ensure long-term stability for lengthy experimental runs

  1. Implosion Source Development and Diego Garcia Reflections

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harben, P E; Boro, C

    2001-06-01

    Calibration of hydroacoustic stations for nuclear explosion monitoring is important for increasing monitoring capability and confidence from newly installed stations and from existing stations. Past work at Ascension Island has shown that ship-towed airguns can be effectively used for local calibrations such as sensor location, amplitude and phase response, and T-phase coupling in the case of T-phase stations. At regional and ocean-basin distances from a station, the calibration focus is on acoustic travel time, transmission loss, bathymetric shadowing, diffraction, and reflection as recorded at a particular station. Such station calibrations will lead to an overall network calibration that seeks tomore » maximize detection, location, and discrimination capability of events with acoustic signatures. Active-source calibration of hydroacoustic stations at regional and ocean-basin scales has not been attempted to date, but we have made significant headway addressing how such calibrations could be accomplished. We have developed an imploding sphere source that can be used instead of explosives on research and commercial vessels without restriction. The imploding sphere has been modeled using the Lawrence Livermore National Laboratory hydrodynamic code CALE and shown to agree with field data. The need for boosted energy in the monitoring band (2-100 Hz) has led us to develop a 5-sphere implosion device that was tested in the Pacific Ocean earlier this year. Boosting the energy in the monitoring band can be accomplished by a combination of increasing the implosion volume (i.e. the 5-sphere device) and imploding at shallower depths. Although active source calibrations will be necessary at particular locations and for particular objectives, the newly installed Diego Garcia station in the Indian Ocean has shown that earthquakes can be used to help understand regional blockages and the locations responsible for observed hydroacoustic reflections. We have analyzed several events with a back-azimuth from Diego Garcia between 100 and 140 degrees. The Diego Garcia records show a pronounced reflection that correlates in travel time and back-azimuth (calculated using the waveform cross-correlation of the tri-partite array elements to determine lag time across the array) with a reflector at the Saya de Malha Bank, on the Seychelles-Mauritius Plateau. We also show that to accurately predict blockage and reflection regions, it is essential to have detailed bathymetry in relatively small but critical areas.« less

  2. Dry calibration of electromagnetic flowmeters based on numerical models combining multiple physical phenomena (multiphysics)

    NASA Astrophysics Data System (ADS)

    Fu, X.; Hu, L.; Lee, K. M.; Zou, J.; Ruan, X. D.; Yang, H. Y.

    2010-10-01

    This paper presents a method for dry calibration of an electromagnetic flowmeter (EMF). This method, which determines the voltage induced in the EMF as conductive liquid flows through a magnetic field, numerically solves a coupled set of multiphysical equations with measured boundary conditions for the magnetic, electric, and flow fields in the measuring pipe of the flowmeter. Specifically, this paper details the formulation of dry calibration and an efficient algorithm (that adaptively minimizes the number of measurements and requires only the normal component of the magnetic flux density as boundary conditions on the pipe surface to reconstruct the magnetic field involved) for computing the sensitivity of EMF. Along with an in-depth discussion on factors that could significantly affect the final precision of a dry calibrated EMF, the effects of flow disturbance on measuring errors have been experimentally studied by installing a baffle at the inflow port of the EMF. Results of the dry calibration on an actual EMF were compared against flow-rig calibration; excellent agreements (within 0.3%) between dry calibration and flow-rig tests verify the multiphysical computation of the fields and the robustness of the method. As requiring no actual flow, the dry calibration is particularly useful for calibrating large-diameter EMFs where conventional flow-rig methods are often costly and difficult to implement.

  3. Collection of Calibration and Validation Data for an Airport Landside Dynamic Simulation Model.

    DTIC Science & Technology

    1980-04-01

    movements. The volume of skiers passing through Denver is sufficiently large to warrant the installation of special check-in counters for passengers with...Terminal, only seven sectors were used. Training Procedures MIA was the first of the three airports surveyed. A substantial amount of knowledge and

  4. 40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...

  5. 40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...

  6. 40 CFR 65.156 - General monitoring requirements for control and recovery devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process § 65.156 General monitoring requirements for... systems. (1) All monitoring equipment shall be installed, calibrated, maintained, and operated according...

  7. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with... owners manual. Following the electronic calibration, you must conduct a temperature sensor validation check in which a second or redundant temperature sensor placed nearby the process temperature sensor...

  8. Day in, Day out

    ERIC Educational Resources Information Center

    Frazier, Mary Claire

    2006-01-01

    Some persuasive research over the past decade shows a strong relationship between the availability of daylight in classrooms and increased test scores for students. Schools seeking to apply that research to actual school construction projects face several hurdles, but the benefits can be real and long-lasting. A properly installed, calibrated and…

  9. 30 CFR 75.344 - Compressors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... air course or to the surface and equipped with sensors to monitor for heat and for carbon monoxide or smoke. The sensors shall deenergize power to the compressor, activate a visual and audible alarm located... every 31 days, sensors installed to monitor for carbon monoxide shall be calibrated with a known...

  10. Remote sensing of an agricultural soil moisture network in Walnut Creek, Iowa

    USDA-ARS?s Scientific Manuscript database

    The calibration and validation of soil moisture remote sensing products is complicated by the logistics of installing a soil moisture network for a long term period in an active landscape. Usually soil moisture sensors are added to existing precipitation networks which have as a singular requiremen...

  11. 40 CFR 63.11583 - What are my monitoring requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... preparation operation are in target HAP service: (a) Operate a bag leak detection system with alarm that will alert operators of a leak in the control device filter material. If a bag leak detection system with... install, calibrate, operate, and maintain each bag leak detection system and alarm according to...

  12. 30 CFR 75.344 - Compressors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... air course or to the surface and equipped with sensors to monitor for heat and for carbon monoxide or smoke. The sensors shall deenergize power to the compressor, activate a visual and audible alarm located... every 31 days, sensors installed to monitor for carbon monoxide shall be calibrated with a known...

  13. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with... owners manual. Following the electronic calibration, you must conduct a temperature sensor validation check in which a second or redundant temperature sensor placed nearby the process temperature sensor...

  14. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  15. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  16. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  17. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  18. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  19. 30 CFR 75.344 - Compressors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... air course or to the surface and equipped with sensors to monitor for heat and for carbon monoxide or smoke. The sensors shall deenergize power to the compressor, activate a visual and audible alarm located... every 31 days, sensors installed to monitor for carbon monoxide shall be calibrated with a known...

  20. 30 CFR 75.344 - Compressors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... air course or to the surface and equipped with sensors to monitor for heat and for carbon monoxide or smoke. The sensors shall deenergize power to the compressor, activate a visual and audible alarm located... every 31 days, sensors installed to monitor for carbon monoxide shall be calibrated with a known...

  1. 40 CFR 63.11583 - What are my monitoring requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applicable, and the following: (1) Locate the pressure sensor(s) in, or as close as possible to, a position... comparing the sensor output to redundant sensor output. (4) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range or install a new pressure sensor. (5...

  2. 30 CFR 75.344 - Compressors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... air course or to the surface and equipped with sensors to monitor for heat and for carbon monoxide or smoke. The sensors shall deenergize power to the compressor, activate a visual and audible alarm located... every 31 days, sensors installed to monitor for carbon monoxide shall be calibrated with a known...

  3. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  4. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  5. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  6. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  7. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  8. 40 CFR 60.1325 - How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... flue gases at the inlet of my particulate matter control device? 60.1325 Section 60.1325 Protection of... the inlet of my particulate matter control device? You must install, calibrate, maintain, and operate... particulate matter control device. ...

  9. 40 CFR 60.1325 - How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... flue gases at the inlet of my particulate matter control device? 60.1325 Section 60.1325 Protection of... the inlet of my particulate matter control device? You must install, calibrate, maintain, and operate... particulate matter control device. ...

  10. 40 CFR 60.264 - Emission monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Emission monitoring. 60.264 Section 60... Facilities § 60.264 Emission monitoring. (a) The owner or operator subject to the provisions of this subpart shall install, calibrate, maintain and operate a continuous monitoring system for measurement of the...

  11. 30 CFR 285.703 - What reports must I submit for project modifications and repairs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Reports § 285.703 What reports must I submit for...

  12. MFP AND JATROPHA PROGRAM

    EPA Science Inventory

    We expect to successfully install and monitor 3 MFPs, to establish a local fabrication plan for the modification kits, to complete pilot testing of SMS based improved data collection techniques, and to increase jatropha mobilization in 20 farming cooperatives.

  13. Improved Cryogenic Optical Test Capability at Marshall Space Flight Center's X-ray Cryogenic Test Facility

    NASA Technical Reports Server (NTRS)

    Kegley, Jeffrey; Haight, Harlan; Hogue, William; Carpenter, Jay; Siler, Richard; Wright, Ernie; Eng, Ron; Baker, Mark; McCracken, Jeff

    2005-01-01

    Marshall Space Flight Center's X-ray & Cryogenic Test Facility (XRCF) has been performing optical wavefront testing and thermal structural deformation testing at subliquid nitrogen cryogenic temperatures since 1999. Recent modifications have been made to the facility in support of the James Webb Space Telescope (JWST) program. The test article envelope and the chamber's refrigeration capacity have both been increased. A new larger helium-cooled enclosure has been added to the existing enclosure increasing both the cross-sectional area and the length. This new enclosure is capable of supporting six JWST Primary Mirror Segment Assemblies. A second helium refrigeration system has been installed essentially doubling the cooling capacity available at the facility. Modifications have also been made to the optical instrumentation area. Improved access is now available for both the installation and operation of optical instrumentation outside the vacuum chamber. Chamber configuration, specifications, and performance data will be presented.

  14. Modification split type air conditioning unit by installing internal heat exchanger and condenser precooling

    NASA Astrophysics Data System (ADS)

    Ambarita, H.

    2018-03-01

    In this paper, a modified of air conditioning (AC) system is proposed. In the modified system, an internal heat exchanger and condenser precooling unit are installed. The objective is to explore the effect of the additional equipment to the performance of the system. An AC with compressor power of 1 PK is modified and compared with the original one. The results show that ER of the modified system is higher than the original one in order of 3.6%. The work of the compressor of the modified system is 12.5% lower than work of the compressor without modification. Finally, the COP of the modified system is 11.71% higher than the original one. These facts reveal that the combination of IHX and condenser precooling shows positive impact on the performance of the AC. It is recommended to use the modified system to improve the energy efficiency of the Air Conditioning system.

  15. Fleet retrofit report

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Flight tests are evaluated of an avionics system which aids the pilot in making two-segment approaches for noise abatement. The implications are discussed of equipping United's fleet of Boeing 727-200 aircraft with two-segment avionics for use down to Category 2 weather operating minima. The experience is reported of incorporating two-segment approach avionics systems on two different aircraft. The cost of installing dual two-segment approach systems is estimated to be $37,015 per aircraft, including parts, labor, and spares. This is based on the assumption that incremental out-of-service and training costs could be minimized by incorporating the system at airframe overhaul cycle and including training in regular recurrent training. Accelerating the modification schedule could add up to 50 percent to the modification costs. Recurring costs of maintenance of the installation are estimated to be of about the same magnitude as the potential recurrent financial benefits due to fuel savings.

  16. Phase 2 Performance and Stability Tests of the YF-100A Airplane

    DTIC Science & Technology

    1953-12-01

    substantially reduced by the installation of the yaw damper on all F-100 aircraft. The production effectivity of this installation is F-1000, No. 164, with...longitudinal control system. The merits and effects of this modification have been discussed elsewhere in this report and in WADC comments on Phase IV tests...a position on the shroud effective ship F-lOOA No. 154 and subsequent. Par E, 2s - Refer to comment on Par E, 2b. Par E, 2u - Flight experience

  17. Electron density measurements in STPX plasmas

    NASA Astrophysics Data System (ADS)

    Clark, Jerry; Williams, R.; Titus, J. B.; Mezonlin, E. D.; Akpovo, C.; Thomas, E.

    2017-10-01

    Diagnostics have been installed to measure the electron density of Spheromak Turbulent Physics Experiment (STPX) plasmas at Florida A. & M. University. An insertable probe, provided by Auburn University, consisting of a combination of a triple-tipped Langmuir probe and a radial array consisting of three ion saturation current / floating potential rings has been installed to measure instantaneous plasma density, temperature and plasma potential. As the ramp-up of the experimental program commences, initial electron density measurements from the triple-probe show that the electron density is on the order of 1019 particles/m3. For a passive measurement, a CO2 interferometer system has been designed and installed for measuring line-averaged densities and to corroborate the Langmuir measurements. We describe the design, calibration, and performance of these diagnostic systems on large volume STPX plasmas.

  18. SU-E-T-267: Construction and Evaluation of a Neutron Wall to Shield a 15 MV Linac in a Low-Energy Vault.

    PubMed

    Speiser, M; Hager, F; Foster, R; Solberg, T

    2012-06-01

    To design and quantify the shielding efficacy of an inner Borated Polyethylene (BPE)wall for a 15 MV linac in a low energy vault. A Varian TrueBeam linac with a maximum photon energy of 15 MV was installed in asmaller, preexisting vault. This vault originally housed a low-energy machine and did not havesufficient maze length recommended for neutron attenuation. Effective dose rate calculationswere performed using the Modified Kersey's Method as detailed in NCRP Report No. 151 andfound to be unacceptably high. An initial survey following the machine installation confirmedthese calculations. Rather than restrict the linac beam energy to 10 MV, BPE was investigatedas a neutron moderating addition. An inner wall and door were planned and constructed using4'×8'×1″ thick 5% BPE sheets. The resulting door and wall had 2″ of BPE; conduits and ductwork were also redesigned and shielded. A survey was conducted following construction of thewall. The vault modification reduced the expected effective dose at the vault door from 36.23to 0.010 mSv/week. As specific guidelines for vault modification are lacking, this project quantitativelydemonstrates the potential use of BPE for vault modification. Such modifications may provide alow-cost shielding solution to allow for the use of high energy modes in smaller treatment vaults. © 2012 American Association of Physicists in Medicine.

  19. Calibration for the shear strain of 3-component borehole strainmeters in eastern Taiwan through Earth and ocean tidal waveform modeling

    NASA Astrophysics Data System (ADS)

    Canitano, Alexandre; Hsu, Ya-Ju; Lee, Hsin-Ming; Linde, Alan T.; Sacks, Selwyn

    2018-03-01

    We propose an approach for calibrating the horizontal tidal shear components [(differential extension (γ _1) and engineering shear (γ _2)] of two Sacks-Evertson (in Pap Meteorol Geophys 22:195-208, 1971) SES-3 borehole strainmeters installed in the Longitudinal Valley in eastern Taiwan. The method is based on the waveform reconstruction of the Earth and ocean tidal shear signals through linear regressions on strain gauge signals, with variable sensor azimuth. This method allows us to derive the orientation of the sensor without any initial constraints and to calibrate the shear strain components γ _1 and γ _2 against M_2 tidal constituent. The results illustrate the potential of tensor strainmeters for recording horizontal tidal shear strain.

  20. Active/passive scanning. [airborne multispectral laser scanners for agricultural and water resources applications

    NASA Technical Reports Server (NTRS)

    Woodfill, J. R.; Thomson, F. J.

    1979-01-01

    The paper deals with the design, construction, and applications of an active/passive multispectral scanner combining lasers with conventional passive remote sensors. An application investigation was first undertaken to identify remote sensing applications where active/passive scanners (APS) would provide improvement over current means. Calibration techniques and instrument sensitivity are evaluated to provide predictions of the APS's capability to meet user needs. A preliminary instrument design was developed from the initial conceptual scheme. A design review settled the issues of worthwhile applications, calibration approach, hardware design, and laser complement. Next, a detailed mechanical design was drafted and construction of the APS commenced. The completed APS was tested and calibrated in the laboratory, then installed in a C-47 aircraft and ground tested. Several flight tests completed the test program.

  1. Dead-blow hammer design applied to a calibration target mechanism to dampen excessive rebound

    NASA Technical Reports Server (NTRS)

    Lim, Brian Y.

    1991-01-01

    An existing rotary electromagnetic driver was specified to be used to deploy and restow a blackbody calibration target inside of a spacecraft infrared science instrument. However, this target was much more massive than any other previously inherited design applications. The target experienced unacceptable bounce when reaching its stops. Without any design modification, the momentum generated by the driver caused the target to bounce back to its starting position. Initially, elastomeric dampers were used between the driver and the target. However, this design could not prevent the bounce, and it compromised the positional accuracy of the calibration target. A design that successfully met all the requirements incorporated a sealed pocket 85 percent full of 0.75 mm diameter stainless steel balls in the back of the target to provide the effect of a dead-blow hammer. The energy dissipation resulting from the collision of balls in the pocket successfully dampened the excess momentum generated during the target deployment. The disastrous effects of new requirements on a design with a successful flight history, the modifications that were necessary to make the device work, and the tests performed to verify its functionality are described.

  2. Assessing Hydrologic Impacts of Land Configuration Changes Using an Integrated Hydrologic Model at the Rocky Flats Environmental Technology Site, Colorado

    NASA Astrophysics Data System (ADS)

    Prucha, R. H.; Dayton, C. S.; Hawley, C. M.

    2002-12-01

    The Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado, a former Department of Energy nuclear weapons manufacturing facility, is currently undergoing closure. The natural semi-arid interaction between surface and subsurface flow at RFETS is complex and complicated by the industrial modifications to the flow system. Using a substantial site data set, a distributed parameter, fully-integrated hydrologic model was developed to assess the hydrologic impact of different hypothetical site closure configurations on the current flow system and to better understand the integrated hydrologic behavior of the system. An integrated model with this level of detail has not been previously developed in a semi-arid area, and a unique, but comprehensive, approach was required to calibrate and validate the model. Several hypothetical scenarios were developed to simulate hydrologic effects of modifying different aspects of the site. For example, some of the simulated modifications included regrading the current land surface, changing the existing surface channel network, removing subsurface trenches and gravity drain flow systems, installing a slurry wall and geotechnical cover, changing the current vegetative cover, and converting existing buildings and pavement to permeable soil areas. The integrated flow model was developed using a rigorous physically-based code so that realistic design parameters can simulate these changes. This code also permitted evaluation of changes to complex integrated hydrologic system responses that included channelized and overland flow, pond levels, unsaturated zone storage, groundwater heads and flow directions, and integrated water balances for key areas. Results generally show that channel flow offsite decreases substantially for different scenarios, while groundwater heads generally increase within the reconfigured industrial area most of which is then discharged as evapotranspiration. These changes have significant implications to site closure and operation.

  3. An in-situ Mobile pH Calibrator for application with HOV and ROV platform in deep sea environments

    NASA Astrophysics Data System (ADS)

    Tan, C.; Ding, K.; Seyfried, W. E., Jr.

    2014-12-01

    Recently, a novel in-situ sensor calibration instrument, Mobile pH Calibrator (MpHC), was developed for application with HOV Alvin. It was specifically designed to conduct in-situ pH measurement in deep sea hydrothermal diffuse fluids with in-situ calibration function. In general, the sensor calibrator involves three integrated electrodes (pH, dissolved H2 and H2S) and a temperature sensor, all of which are installed in a cell with a volume of ~ 1 ml. A PEEK check valve cartridge is installed at the inlet end of the cell to guide the flow path during the measurement and calibration processes. Two PEEK tubes are connected at outlet end of the cell for drawing out hydrothermal fluid and delivering pH buffer fluids. During its measurement operation, the pump draws in hydrothermal fluid, which then passes through the check valve directly into the sensing cell. When in calibration mode, the pump delivers pH buffers into the cell, while automatically closing the check valve to the outside environment. This probe has two advantages compared to our previous unit used during KNOX18RR MAR cruise in 2008 and MARS cabled observatory deployment in 2012. First, in the former design, a 5 cm solenoid valve was equipped with the probe. This enlarged size prevented its application in specific point or small area. In this version, the probe has only a dimension of 1.6 cm for an easy access to hydrothermal biological environments. Secondly, the maximum temperature condition of the earlier system was limited by the solenoid valve precluding operation in excess of 50 ºC. The new design avoids this problem, which improves its temperature tolerance. The upper limit of temperature condition is now up to 100oC, therefore enabling broader application in hydrothermal diffuse flow system on the seafloor. During SVC cruise (AT26-12) in the Gulf of Mexico this year, the MpHC was successfully tested with Alvin dives at the depth up to 2600 m for measuring pH with in-situ calibration in seafloor cold seep environment. The measurement and calibration were also conducted in hydrothermal diffuse flow at temperature condition exceeding 70 ºC with Alvin dives during a recent cruise AT26-17 in ASHES vent field and Main Endeavour Field on Juan de Fuca Ridge. Data from these seagoing deployments will be presented, with emphasis on both technical and scientific aplications.

  4. Verifying the Performance of RTDs in Nuclear Power Plants

    NASA Astrophysics Data System (ADS)

    Hashemian, H. M.

    2003-09-01

    This paper describes a number of techniques that have been developed for nuclear power plants to ensure that optimum steady-state and transient performance is achieved with the resistance temperature detectors (RTDs) that are used in the plant for critical temperature measurements. This includes precision laboratory calibration of RTDs, the Loop Current Step Response (LCSR) method for in-situ response time measurements, a cross calibration technique to verify the steady-state performance of RTDs as installed in the plant, and the Time Domain Reflectometry (TDR) test that is used to identify the location of a problem along RTD cables.

  5. Edge Thomson scattering diagnostic on COMPASS tokamak: Installation, calibration, operation, improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bohm, P., E-mail: bohm@ipp.cas.cz; Bilkova, P.; Melich, R.

    2014-11-15

    The core Thomson scattering diagnostic (TS) on the COMPASS tokamak was put in operation and reported earlier. Implementation of edge TS, with spatial resolution along the laser beam up to ∼1/100 of the tokamak minor radius, is presented now. The procedure for spatial calibration and alignment of both core and edge systems is described. Several further upgrades of the TS system, like a triggering unit and piezo motor driven vacuum window shutter, are introduced as well. The edge TS system, together with the core TS, is now in routine operation and provides electron temperature and density profiles.

  6. HST WFC3/IR Calibration Updates

    NASA Astrophysics Data System (ADS)

    Durbin, Meredith; Brammer, Gabriel; Long, Knox S.; Pirzkal, Norbert; Ryan, Russell E.; McCullough, Peter R.; Baggett, Sylvia M.; Gosmeyer, Catherine; Bourque, Matthew; HST WFC3 Team

    2016-01-01

    We report on several improvements to the characterization, monitoring, and calibration of the HST WFC3/IR detector. The detector performance has remained overall stable since its installation during HST Servicing Mission 4 in 2009. We present an updated persistence model that takes into account effects of exposure time and spatial variations in persistence across the detector, new grism wavelength solutions and master sky images, and a new SPARS sample sequence. We also discuss the stability of the IR gain, the time evolution and photometric properties of IR "snowballs," and the effect of IR "blobs" on point-source photometry.

  7. Modeling Improvements and Users Manual for Axial-flow Turbine Off-design Computer Code AXOD

    NASA Technical Reports Server (NTRS)

    Glassman, Arthur J.

    1994-01-01

    An axial-flow turbine off-design performance computer code used for preliminary studies of gas turbine systems was modified and calibrated based on the experimental performance of large aircraft-type turbines. The flow- and loss-model modifications and calibrations are presented in this report. Comparisons are made between computed performances and experimental data for seven turbines over wide ranges of speed and pressure ratio. This report also serves as the users manual for the revised code, which is named AXOD.

  8. Automatic calibration and signal switching system for the particle beam fusion research data acquisition facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boyer, W.B.

    1979-09-01

    This report describes both the hardware and software components of an automatic calibration and signal system (Autocal) for the data acquisition system for the Sandia particle beam fusion research accelerators Hydra, Proto I, and Proto II. The Autocal hardware consists of off-the-shelf commercial equipment. The various hardware components, special modifications and overall system configuration are described. Special software has been developed to support the Autocal hardware. Software operation and maintenance are described.

  9. Aerodynamic stability analysis of NASA J85-13/planar pressure pulse generator installation

    NASA Technical Reports Server (NTRS)

    Chung, K.; Hosny, W. M.; Steenken, W. G.

    1980-01-01

    A digital computer simulation model for the J85-13/Planar Pressure Pulse Generator (P3 G) test installation was developed by modifying an existing General Electric compression system model. This modification included the incorporation of a novel method for describing the unsteady blade lift force. This approach significantly enhanced the capability of the model to handle unsteady flows. In addition, the frequency response characteristics of the J85-13/P3G test installation were analyzed in support of selecting instrumentation locations to avoid standing wave nodes within the test apparatus and thus, low signal levels. The feasibility of employing explicit analytical expression for surge prediction was also studied.

  10. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the south wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a construction worker assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  15. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  16. Flight Calibration of four airspeed systems on a swept-wing airplane at Mach numbers up to 1.04 by the NACA radar-phototheodolite method

    NASA Technical Reports Server (NTRS)

    Thompson, Jim Rogers; Bray, Richard S; COOPER GEORGE E

    1950-01-01

    The calibrations of four airspeed systems installed in a North American F-86A airplane have been determined in flight at Mach numbers up to 1.04 by the NACA radar-phototheodolite method. The variation of the static-pressure error per unit indicated impact pressure is presented for three systems typical of those currently in use in flight research, a nose boom and two different wing-tip booms, and for the standard service system installed in the airplane. A limited amount of information on the effect of airplane normal-force coefficient on the static-pressure error is included. The results are compared with available theory and with results from wind-tunnel tests of the airspeed heads alone. Of the systems investigated, a nose-boom installation was found to be most suitable for research use at transonic and low supersonic speeds because it provided the greatest sensitivity of the indicated Mach number to a unit change in true Mach number at very high subsonic speeds, and because it was least sensitive to changes in airplane normal-force coefficient. The static-pressure error of the nose-boom system was small and constant above a Mach number of 1.03 after passage of the fuselage bow shock wave over the airspeed head.

  17. Reducing heliostat field costs by direct measurement and control of the mirror orientation

    NASA Astrophysics Data System (ADS)

    van den Donker, P.; Rosinga, G.; van Voorthuysen, E. du Marchie

    2016-05-01

    The first commercial CSP Central Receiver System has been in operation since 2007. The technology required for such a central receiver system is quite new. The determining factor of the price of electricity is the capital investment in the heliostat field. The cost level per square meter of the heliostat field is rather high. Sun2point is questioning the market development, which is trying to get the cost level down by aiming at large heliostats. Sun2Point aims at mass manufacturing small heliostats to achieve low prices. Mass manufacturing off-site and transport over long distances is possible for small heliostats only. Calibration on the spot is a labour-intensive activity. Autonomous, factory calibrated and wireless controlled heliostats are the solution to lower installation cost. A new measurement method that directly reports the orientation of the heliostat in relation to the earth and the sun can solve the calibration problem when the heliostats are installed. The application of small heliostats will be much cheaper as a result of this measurement method. In this paper several methods for such a measurement are described briefly. The new Sun2Point method has successfully been tested. In this paper Sun2Point challenges the CSP community to investigate this approach. A brief survey is presented of many aspects that lead to a low price.

  18. NICMOS Cycles 13 and 14 Calibration Plans

    NASA Astrophysics Data System (ADS)

    Arribas, Santiago; Bergeron, Eddie; de Jong, Roeof; Malhotra, Sangeeta; Mobasher, Bahram; Noll, Keith; Schultz, Al; Wiklind, Tommy; Xu, Chun

    2005-11-01

    This document summarizes the NICMOS Calibration Plans for Cycles 13 and 14. These plans complement the SMOV3b, the Cycle 10 (interim), and the Cycles 11 and 12 (regular) calibration programs executed after the installation of the NICMOS Cooling System (NCS).. These previous programs have shown that the instrument is very stable, which has motivated a further reduction in the frequency of the monitoring programs for Cycle 13. In addition, for Cycle 14 some of these programs were slightly modified to account for 2 Gyro HST operations. The special calibrations on Cycle 13 were focussed on a follow up of the spectroscopic recalibration initiated in Cycle 12. This program led to the discovery of a possible count rate non-linearity, which has triggered a special program for Cycle 13 and a number of subsequent tests and calibrations during Cycle 14. At the time of writing this is a very active area of research. We also briefly comment on other calibrations defined to address other specific issues like: the autoreset test, the SPAR sequences tests, and the low-frequency flat residual for NIC1. The calibration programs for the 2-Gyro campaigns are not included here, since they have been described somewhere else. Further details and updates on specific programs can be found via the NICMOS web site.

  19. A Synthesis of Star Calibration Techniques for Ground-Based Narrowband Electron-Multiplying Charge-Coupled Device Imagers Used in Auroral Photometry

    NASA Technical Reports Server (NTRS)

    Grubbs, Guy II; Michell, Robert; Samara, Marilia; Hampton, Don; Jahn, Jorg-Micha

    2016-01-01

    A technique is presented for the periodic and systematic calibration of ground-based optical imagers. It is important to have a common system of units (Rayleighs or photon flux) for cross comparison as well as self-comparison over time. With the advancement in technology, the sensitivity of these imagers has improved so that stars can be used for more precise calibration. Background subtraction, flat fielding, star mapping, and other common techniques are combined in deriving a calibration technique appropriate for a variety of ground-based imager installations. Spectral (4278, 5577, and 8446 A ) ground-based imager data with multiple fields of view (19, 47, and 180 deg) are processed and calibrated using the techniques developed. The calibration techniques applied result in intensity measurements in agreement between different imagers using identical spectral filtering, and the intensity at each wavelength observed is within the expected range of auroral measurements. The application of these star calibration techniques, which convert raw imager counts into units of photon flux, makes it possible to do quantitative photometry. The computed photon fluxes, in units of Rayleighs, can be used for the absolute photometry between instruments or as input parameters for auroral electron transport models.

  20. Design and Implementation of the Boundary Layer Transition Flight Experiment on Space Shuttle Discovery

    NASA Technical Reports Server (NTRS)

    Spanos, Theodoros A.; Micklos, Ann

    2010-01-01

    In an effort to better the understanding of high speed aerodynamics, a series of flight experiments were installed on Space Shuttle Discovery during the STS-119 and STS-128 missions. This experiment, known as the Boundary Layer Transition Flight Experiment (BLTFE), provided the technical community with actual entry flight data from a known height protuberance at Mach numbers at and above Mach 15. Any such data above Mach 15 is irreproducible in a laboratory setting. Years of effort have been invested in obtaining this valuable data, and many obstacles had to be overcome in order to ensure the success of implementing an Orbiter modification. Many Space Shuttle systems were involved in the installation of appropriate components that revealed 'concurrent engineering' was a key integration tool. This allowed the coordination of all various parts and pieces which had to be sequenced appropriately and installed at the right time. Several issues encountered include Orbiter configuration and access, design requirements versus current layout, implementing the modification versus typical processing timelines, and optimizing the engineering design cycles and changes. Open lines of communication within the entire modification team were essential to project success as the team was spread out across the United States, from NASA Kennedy Space Center in Florida, to NASA Johnson Space Center in Texas, to Boeing Huntington Beach, California among others. The forum permits the discussion of processing concerns from the design phase to the implementation phase, which eventually saw the successful flights and data acquisition on STS-119 in March 2009 and on STS-128 in September 2009.

  1. Chemical synthesis of membrane proteins by the removable backbone modification method.

    PubMed

    Tang, Shan; Zuo, Chao; Huang, Dong-Liang; Cai, Xiao-Ying; Zhang, Long-Hua; Tian, Chang-Lin; Zheng, Ji-Shen; Liu, Lei

    2017-12-01

    Chemical synthesis can produce membrane proteins bearing specifically designed modifications (e.g., phosphorylation, isotope labeling) that are difficult to obtain through recombinant protein expression approaches. The resulting homogeneously modified synthetic membrane proteins are valuable tools for many advanced biochemical and biophysical studies. This protocol describes the chemical synthesis of membrane proteins by condensation of transmembrane peptide segments through native chemical ligation. To avoid common problems encountered due to the poor solubility of transmembrane peptides in almost any solvent, we describe an effective procedure for the chemical synthesis of membrane proteins through the removable-backbone modification (RBM) strategy. Two key steps of this protocol are: (i) installation of solubilizing Arg4-tagged RBM groups into the transmembrane peptides at any primary amino acid through Fmoc (9-fluorenylmethyloxycarbonyl) solid-phase peptide synthesis and (ii) native ligation of the full-length sequence, followed by removal of the RBM tags by TFA (trifluoroacetic acid) cocktails to afford the native protein. The installation of RBM groups is achieved by using 4-methoxy-5-nitrosalicyladehyde by reduction amination to incorporate an activated O-to-N acyl transfer auxiliary. The Arg4-tag-modified membrane-spanning peptide segments behave like water-soluble peptides to facilitate their purification, ligation and mass characterization.

  2. 41 CFR 102-33.170 - What standards must we establish or require (contractually, where applicable) for maintenance of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... appliance repairs, modifications, or equipment installations. (e) A quality control system for acquiring... tracking maintenance actions; inspections; and the flight hours, cycles, and calendar times of life-limited...

  3. 7 CFR 1468.24 - Contract modifications and transfers of land.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... conservation practices installed under CRP, EQIP, or WRP. (c) CCC may require a participant to refund all or a portion of any assistance earned under a CRP or EQIP contract, or WRP cost-share agreement that was...

  4. 30 CFR 250.905 - How do I get approval for the installation, modification, or repair of my platform?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... four copies. (b) Location plat Latitude and longitude coordinates, Universal Mercator grid-system coordinates, state plane coordinates in the Lambert or Transverse Mercator Projection System, and distances in...

  5. Solar Space and Water Heating for School -- Dallas, Texas

    NASA Technical Reports Server (NTRS)

    1982-01-01

    90 page report gives overview of retrofitted solar space-heating and hot-water system installation for 61-year-old high school. Description, specifications, modifications, plan drawings for roof, three floors, basement, correspondence, and documents are part of report.

  6. Effect of Scintillometer Height on Structure Parameter of the Refractive Index of Air Measurements

    NASA Astrophysics Data System (ADS)

    Gowda, P. H.; Howell, T. A.; Hartogensis, O.; Basu, S.; Scanlon, B. R.

    2009-12-01

    Scintillometers measure amount of scintillations by emitting a beam of light over a horizontal path and expresses as the atmospheric turbulence structure parameter as the refractive index of air (Cn2). Cn2 represents the turbulent strength of the atmosphere and describes the ability of the atmosphere to transport heat and humidity. The main objective of this study was to evaluate the effect of scintillometer height on Cn2 measurements and on the estimation of latent heat fluxes. The study was conducted during the 2009 summer growing season in the USDA-ARS Conservation and Production Research Laboratory (CPRL) at Bushland [350 11' N, 1020 06' W; 1,170 m elevation MSL], Texas. Field experiment consisted of two steps: (1) cross-calibration of scintillometers and (2) measurement of Cn2 at different heights. In the first step, three large aperture scintillometers (LAS) were deployed across two large lysimeter fields with bare soil surfaces. During the 3-week cross-calibration period, all three scintillometers were installed at a 2-m height with a path length of 420 m. Cn2 was monitored at a 1-min interval and averaged for 15-min periods. Cn2 measurements were synchronized with weather station and weighing lysimeter measurements. After the cross-calibration period, scintillometers were installed at 2-, 2.5- and 3-m heights, and Cn2 measurements were continued for another 3-week period. In addition to the Cn2 measurements, net radiation (Rn) and soil heat fluxes (G) were measured in both lysimeter fields. Cn2 values were corrected for inner scale dependence before cross calibration and estimation of sensible heat fluxes. Measurements of wind speed, air temperature, and relative humidity were used with Cn2 data to derive sensible heat fluxes. Latent heat fluxes were estimated as a residual from the energy balance and compared with lysimeter data. Results of cross calibration and effects of scintillometer height on the estimation of latent heat fluxes were reported and discussed.

  7. The Temporal Dynamics of Spatial Patterns of Observed Soil Moisture Interpreted Using the Hydrus 1-D Model

    NASA Astrophysics Data System (ADS)

    Chen, M.; Willgoose, G. R.; Saco, P. M.

    2009-12-01

    This paper investigates the soil moisture dynamics over two subcatchments (Stanley and Krui) in the Goulburn River in NSW during a three year period (2005-2007) using the Hydrus 1-D unsaturated soil water flow model. The model was calibrated to the seven Stanley microcatchment sites (1 sqkm site) using continuous time surface 30cm and full profile soil moisture measurements. Soil type, leaf area index and soil depth were found to be the key parameters changing model fit to the soil moisture time series. They either shifted the time series up or down, changed the steepness of dry-down recessions or determined the lowest point of soil moisture dry-down respectively. Good correlations were obtained between observed and simulated soil water storage (R=0.8-0.9) when calibrated parameters for one site were applied to the other sites. Soil type was also found to be the main determinant (after rainfall) of the mean of modelled soil moisture time series. Simulations of top 30cm were better than those of the whole soil profile. Within the Stanley microcatchment excellent soil moisture matches could be generated simply by adjusting the mean of soil moisture up or down slightly. Only minor modification of soil properties from site to site enable good fits for all of the Stanley sites. We extended the predictions of soil moisture to a larger spatial scale of the Krui catchment (sites up to 30km distant from Stanley) using soil and vegetation parameters from Stanley but the locally recorded rainfall at the soil moisture measurement site. The results were encouraging (R=0.7~0.8). These results show that it is possible to use a calibrated soil moisture model to extrapolate the soil moisture to other sites for a catchment with an area of up to 1000km2. This paper demonstrates the potential usefulness of continuous time, point scale soil moisture (typical of that measured by permanently installed TDR probes) in predicting the soil wetness status over a catchment of significant size.

  8. Non-matrix Matched Glass Disk Calibration Standards Improve XRF Micronutrient Analysis of Wheat Grain across Five Laboratories in India

    PubMed Central

    Guild, Georgia E.; Stangoulis, James C. R.

    2016-01-01

    Within the HarvestPlus program there are many collaborators currently using X-Ray Fluorescence (XRF) spectroscopy to measure Fe and Zn in their target crops. In India, five HarvestPlus wheat collaborators have laboratories that conduct this analysis and their throughput has increased significantly. The benefits of using XRF are its ease of use, minimal sample preparation and high throughput analysis. The lack of commercially available calibration standards has led to a need for alternative calibration arrangements for many of the instruments. Consequently, the majority of instruments have either been installed with an electronic transfer of an original grain calibration set developed by a preferred lab, or a locally supplied calibration. Unfortunately, neither of these methods has been entirely successful. The electronic transfer is unable to account for small variations between the instruments, whereas the use of a locally provided calibration set is heavily reliant on the accuracy of the reference analysis method, which is particularly difficult to achieve when analyzing low levels of micronutrient. Consequently, we have developed a calibration method that uses non-matrix matched glass disks. Here we present the validation of this method and show this calibration approach can improve the reproducibility and accuracy of whole grain wheat analysis on 5 different XRF instruments across the HarvestPlus breeding program. PMID:27375644

  9. ADOT state-specific crash prediction models : an Arizona needs study.

    DOT National Transportation Integrated Search

    2016-12-01

    The predictive method in the Highway Safety Manual (HSM) includes a safety performance function (SPF), : crash modification factors (CMFs), and a local calibration factor (C), if available. Two alternatives exist for : applying the HSM prediction met...

  10. KSC-95pc586

    NASA Image and Video Library

    1995-04-17

    KENNEDY SPACE CENTER, FLA. - Space Shuttle Main Engine (SSME) No. 2036, the first of the new Block 1 engines to fly, awaits installation into position one of the orbiter Discovery in Orbiter Processing Facility 2 during preparation of the spaceplane for the STS-70 mission. The advanced powerplant features a new high-pressure liquid oxygen turbopump, a two-duct powerhead, a baffleless main injector, a single-coil heat exchanger and start sequence modifications. These modifications are designed to improve both engine performance and safety.

  11. Discovery Orbiter Major Modifications

    NASA Image and Video Library

    2003-08-27

    During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician moves a circuit reset on the cockpit console. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”

  12. Hot Cell Installation and Demonstration of the Severe Accident Test Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linton, Kory D.; Burns, Zachary M.; Terrani, Kurt A.

    A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examinemore » postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.« less

  13. ITER-like antenna capacitors voltage probes: Circuit/electromagnetic calculations and calibrations.

    PubMed

    Helou, W; Dumortier, P; Durodié, F; Lombard, G; Nicholls, K

    2016-10-01

    The analyses illustrated in this manuscript have been performed in order to provide the required data for the amplitude-and-phase calibration of the D-dot voltage probes used in the ITER-like antenna at the Joint European Torus tokamak. Their equivalent electrical circuit has been extracted and analyzed, and it has been compared to the one of voltage probes installed in simple transmission lines. A radio-frequency calibration technique has been formulated and exact mathematical relations have been derived. This technique mixes in an elegant fashion data extracted from measurements and numerical calculations to retrieve the calibration factors. The latter have been compared to previous calibration data with excellent agreement proving the robustness of the proposed radio-frequency calibration technique. In particular, it has been stressed that it is crucial to take into account environmental parasitic effects. A low-frequency calibration technique has been in addition formulated and analyzed in depth. The equivalence between the radio-frequency and low-frequency techniques has been rigorously demonstrated. The radio-frequency calibration technique is preferable in the case of the ITER-like antenna due to uncertainties on the characteristics of the cables connected at the inputs of the voltage probes. A method to extract the effect of a mismatched data acquisition system has been derived for both calibration techniques. Finally it has been outlined that in the case of the ITER-like antenna voltage probes can be in addition used to monitor the currents at the inputs of the antenna.

  14. 40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emissions are controlled with a common control device or series of control devices, are discharged to the... devices or multiple series of control devices are discharged to the atmosphere through more than one stack... control activities (including, as applicable, calibration checks and required zero and span adjustments...

  15. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  16. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  17. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  18. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  19. 40 CFR 60.13 - Monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once each operating day in accordance with a written procedure. The zero and span must, at a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift...

  20. 40 CFR 60.13 - Monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...

  1. 40 CFR 60.13 - Monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...

  2. Validation of in situ networks via field sampling: case study in the South Fork Experimental Watershed

    USDA-ARS?s Scientific Manuscript database

    The calibration and validation of soil moisture remote sensing products is complicated by the logistics of installing a soil moisture network for a long term period in an active landscape. Therefore, these stations are located along field boundaries or in non-representative sites with regards to so...

  3. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...

  4. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...

  5. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...

  6. 40 CFR 60.13 - Monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...

  7. 40 CFR 60.1810 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... municipal waste combustion unit? 60.1810 Section 60.1810 Protection of Environment ENVIRONMENTAL PROTECTION... Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30... combustion unit? (a) If your municipal waste combustion unit generates steam, you must install, calibrate...

  8. 40 CFR 60.1810 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... municipal waste combustion unit? 60.1810 Section 60.1810 Protection of Environment ENVIRONMENTAL PROTECTION... Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30... combustion unit? (a) If your municipal waste combustion unit generates steam, you must install, calibrate...

  9. 40 CFR 60.1810 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... municipal waste combustion unit? 60.1810 Section 60.1810 Protection of Environment ENVIRONMENTAL PROTECTION... Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30... combustion unit? (a) If your municipal waste combustion unit generates steam, you must install, calibrate...

  10. 40 CFR 60.1810 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... municipal waste combustion unit? 60.1810 Section 60.1810 Protection of Environment ENVIRONMENTAL PROTECTION... Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30... combustion unit? (a) If your municipal waste combustion unit generates steam, you must install, calibrate...

  11. 40 CFR 60.1810 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... municipal waste combustion unit? 60.1810 Section 60.1810 Protection of Environment ENVIRONMENTAL PROTECTION... Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30... combustion unit? (a) If your municipal waste combustion unit generates steam, you must install, calibrate...

  12. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... audit, and an annual zero alignment audit of each COMS. (6) You must operate and maintain each COMS... assessment, a quarterly performance audit, or an annual zero alignment audit. (7) You must determine and... control activities (including, as applicable, calibration checks and required zero and span adjustments...

  13. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... include a daily calibration drift assessment, a quarterly performance audit, and an annual zero alignment... performance audit, or an annual zero alignment audit. (7) You must calculate and record 6-minute averages from... absolute particulate matter loadings. (5) The bag leak detection system must be equipped with a device to...

  14. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... audit, and an annual zero alignment audit of each COMS. (6) You must operate and maintain each COMS... assessment, a quarterly performance audit, or an annual zero alignment audit. (7) You must determine and... control activities (including, as applicable, calibration checks and required zero and span adjustments...

  15. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... include a daily calibration drift assessment, a quarterly performance audit, and an annual zero alignment... performance audit, or an annual zero alignment audit. (7) You must calculate and record 6-minute averages from... absolute particulate matter loadings. (5) The bag leak detection system must be equipped with a device to...

  16. An Analysis of the Advantages and Disadvantages of the Air Force Standard Control Panel

    DTIC Science & Technology

    1989-09-01

    comparativ - process. The built-up system required approximately 100 hours to design , install and calibrate. The reader is reminded that the built-up...Summary......................................... 9 Outline of Research Design .................... 9 Ii. Literature Review...133 Question 3 .......................... 133 Area 3: Design Phase ................... 134 Question 4 .......................... 134 Area 4

  17. 40 CFR 60.13 - Monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...

  18. A dry-cooled AC quantum voltmeter

    NASA Astrophysics Data System (ADS)

    Schubert, M.; Starkloff, M.; Peiselt, K.; Anders, S.; Knipper, R.; Lee, J.; Behr, R.; Palafox, L.; Böck, A. C.; Schaidhammer, L.; Fleischmann, P. M.; Meyer, H.-G.

    2016-10-01

    The paper describes a dry-cooled AC quantum voltmeter system operated up to kilohertz frequencies and 7 V rms. A 10 V programmable Josephson voltage standard (PJVS) array was installed on a pulse tube cooler (PTC) driven with a 4 kW air-cooled compressor. The operating margins at 70 GHz frequencies were investigated in detail and found to exceed 1 mA Shapiro step width. A key factor for the successful chip operation was the low on-chip power consumption of 65 mW in total. A thermal interface between PJVS chip and PTC cold stage was used to avoid a significant chip overheating. By installing the cryocooled PJVS array into an AC quantum voltmeter setup, several calibration measurements of dc standards and calibrator ac voltages up to 2 kHz frequencies were carried out to demonstrate the full functionality. The results are discussed and compared to systems with standard liquid helium cooling. For dc voltages, a direct comparison measurement between the dry-cooled AC quantum voltmeter and a liquid-helium based 10 V PJVS shows an agreement better than 1 part in 1010.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pablant, N. A.; Delgado-Aparicio, L.; Bitter, M.

    A new energy resolving x-ray pinhole camera has been recently installed on Alcator C-Mod. This diagnostic is capable of 1D or 2D imaging with a spatial resolution of Almost-Equal-To 1 cm, an energy resolution of Almost-Equal-To 1 keV in the range of 3.5-15 keV and a maximum time resolution of 5 ms. A novel use of a Pilatus 2 hybrid-pixel x-ray detector [P. Kraft et al., J. Synchrotron Rad. 16, 368 (2009)] is employed in which the lower energy threshold of individual pixels is adjusted, allowing regions of a single detector to be sensitive to different x-ray energy ranges. Developmentmore » of this new detector calibration technique was done as a collaboration between PPPL and Dectris Ltd. The calibration procedure is described, and the energy resolution of the detector is characterized. Initial data from this installation on Alcator C-Mod is presented. This diagnostic provides line-integrated measurements of impurity emission which can be used to determine impurity concentrations as well as the electron energy distribution.« less

  20. Novel energy resolving x-ray pinhole camera on Alcator C-Mod.

    PubMed

    Pablant, N A; Delgado-Aparicio, L; Bitter, M; Brandstetter, S; Eikenberry, E; Ellis, R; Hill, K W; Hofer, P; Schneebeli, M

    2012-10-01

    A new energy resolving x-ray pinhole camera has been recently installed on Alcator C-Mod. This diagnostic is capable of 1D or 2D imaging with a spatial resolution of ≈1 cm, an energy resolution of ≈1 keV in the range of 3.5-15 keV and a maximum time resolution of 5 ms. A novel use of a Pilatus 2 hybrid-pixel x-ray detector [P. Kraft et al., J. Synchrotron Rad. 16, 368 (2009)] is employed in which the lower energy threshold of individual pixels is adjusted, allowing regions of a single detector to be sensitive to different x-ray energy ranges. Development of this new detector calibration technique was done as a collaboration between PPPL and Dectris Ltd. The calibration procedure is described, and the energy resolution of the detector is characterized. Initial data from this installation on Alcator C-Mod is presented. This diagnostic provides line-integrated measurements of impurity emission which can be used to determine impurity concentrations as well as the electron energy distribution.

  1. [Evaluation of vaporizers by anesthetic gas monitors corrected with a new method for preparation of calibration gases].

    PubMed

    Kurashiki, T

    1996-11-01

    For resolving the discrepancy of concentrations found among anesthetic gas monitors, the author proposed a new method using a vaporizer as a standard anesthetic gas generator for calibration. In this method, the carrier gas volume is measured by a mass flow meter (SEF-510 + FI-101) installed before the inlet of the vaporizer. The vaporized weight of volatile anesthetic agent is simultaneously measured by an electronic force balance (E12000S), on which the vaporizer is placed directly. The molar percent of the anesthetic is calculated using these data and is transformed into the volume percent. These gases discharging from the vaporizer are utilized for calibrating anesthetic gas monitors. These monitors are normalized by the linear equation describing the relationship between concentrations of calibration gases and readings of the anesthetic gas monitors. By using normalized monitors, flow rate-concentration performance curves of several anesthetic vaporizers were obtained. The author concludes that this method can serve as a standard in evaluating anesthetic vaporizers.

  2. Assessing the feasibility of low temperature XAFS experiments at Indus-2, India: First results

    NASA Astrophysics Data System (ADS)

    Ramanan, Nitya; Rajput, Parasmani; Jha, S. N.; Lahiri, Debdutta

    2015-05-01

    In this work, we report installation of displex cryostat XAFS sample holder at XAFS beamline (BL-09) of Indus-2 synchrotron facility, India and make critical assessment of feasibility of low-temperature XAFS experiments in terms of data quality and reproducibility, temperature range, calibration and attainable resolution. We adopted the Debye Model-based calibration method by measuring XAFS of standard Au foil with known Debye temperature (ΘDebye)Autheory = 165 K. The data is of good quality and reproducible with international data. By fitting Debye Waller Factor (σexpt2 (T)), we deduced (ΘDebye)Auexpt = 163 K which implies calibration within 2 K. Error bars for σexpt2 (T) correspond to temperature uncertainty ΔT ≤ 5 K, which defines the temperature resolution for low temperature XAFS experiments. Thus, from both calibration and resolution points-of-view, this work demonstrates the feasibility of low temperature XAFS experiments at BL-09, Indus-2. Feasibility of extending XAFS experiments to lower temperature and unknown samples is discussed.

  3. Installation and laboratory evaluation of alternatives to conventional polymer modification for asphalt.

    DOT National Transportation Integrated Search

    2015-01-01

    The Virginia Department of Transportation (VDOT) specifies polymer-modified asphalt binders for certain asphalt : mixtures used on high-volume, high-priority routes. These binders must meet performance grade (PG) requirements for a PG : 76-22 binder ...

  4. Advanced component testing : Kaskasia handbrake test.

    DOT National Transportation Integrated Search

    2016-07-01

    The evaluation of a prototype remote operation handbrake showed that it can be installed on a car with only minor modifications to connect the air. This prototype did not set the emergency during any of the testing performed. The operation of the pro...

  5. Calibrating cellular automaton models for pedestrians walking through corners

    NASA Astrophysics Data System (ADS)

    Dias, Charitha; Lovreglio, Ruggiero

    2018-05-01

    Cellular Automata (CA) based pedestrian simulation models have gained remarkable popularity as they are simpler and easier to implement compared to other microscopic modeling approaches. However, incorporating traditional floor field representations in CA models to simulate pedestrian corner navigation behavior could result in unrealistic behaviors. Even though several previous studies have attempted to enhance CA models to realistically simulate pedestrian maneuvers around bends, such modifications have not been calibrated or validated against empirical data. In this study, two static floor field (SFF) representations, namely 'discrete representation' and 'continuous representation', are calibrated for CA-models to represent pedestrians' walking behavior around 90° bends. Trajectory data collected through a controlled experiment are used to calibrate these model representations. Calibration results indicate that although both floor field representations can represent pedestrians' corner navigation behavior, the 'continuous' representation fits the data better. Output of this study could be beneficial for enhancing the reliability of existing CA-based models by representing pedestrians' corner navigation behaviors more realistically.

  6. Calibration and verification of models of organic carbon removal kinetics in Aerated Submerged Fixed-Bed Biofilm Reactors (ASFBBR): a case study of wastewater from an oil-refinery.

    PubMed

    Trojanowicz, Karol; Wójcik, Włodzimierz

    2011-01-01

    The article presents a case-study on the calibration and verification of mathematical models of organic carbon removal kinetics in biofilm. The chosen Harremöes and Wanner & Reichert models were calibrated with a set of model parameters obtained both during dedicated studies conducted at pilot- and lab-scales for petrochemical wastewater conditions and from the literature. Next, the models were successfully verified through studies carried out utilizing a pilot ASFBBR type bioreactor installed in an oil-refinery wastewater treatment plant. During verification the pilot biofilm reactor worked under varying surface organic loading rates (SOL), dissolved oxygen concentrations and temperatures. The verification proved that the models can be applied in practice to petrochemical wastewater treatment engineering for e.g. biofilm bioreactor dimensioning.

  7. Calibration of a microchannel plate based extreme ultraviolet grazing incident spectrometer at the Advanced Light Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bakeman, M. S.; Lawrence Berkeley National Laboratory, Berkeley, California 94720; Tilborg, J. van

    We present the design and calibration of a microchannel plate based extreme ultraviolet spectrometer. Calibration was performed at the Advance Light Source (ALS) at the Lawrence Berkeley National Laboratory (LBNL). This spectrometer will be used to record the single shot spectrum of radiation emitted by the tapered hybrid undulator (THUNDER) undulator installed at the LOASIS GeV-class laser-plasma-accelerator. The spectrometer uses an aberration-corrected concave grating with 1200 lines/mm covering 11-62 nm and a microchannel plate detector with a CsI coated photocathode for increased quantum efficiency in the extreme ultraviolet. A touch screen interface controls the grating angle, aperture size, and placementmore » of the detector in vacuum, allowing for high-resolution measurements over the entire spectral range.« less

  8. The effects on cruise drag of installing long-duct refan-engine nacelles on the McDonnell Douglas DC-8-50 and -61

    NASA Technical Reports Server (NTRS)

    Callaghan, J. T.; Donelson, J. E.; Morelli, J. P.

    1973-01-01

    A high-speed wind tunnel test was conducted to determine the effect on cruise performance of installing long-duct refan-engine nacelles on the DC-8-50 and -61 models. Drag data and wing/pylon/nacelle channel pressure data are presented. At a typical cruise condition there exists a very small interference drag penalty of less than one-percent of total cruise data for the Refan installation. Pressure data indicate that some supersonic flow is present in the inboard channel of the inboard refan nacelle installation, but it is not sufficient to cause any wave drag on boundary layer separation. One pylon modification, which takes the form of pylon bumps, was tested. It resulted in a drag penalty, because its design goal of eliminating shock-related interference drag was not required and the bump thus became a source of additional parasite drag.

  9. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    Construction workers wearing safety harnesses and tethered lines assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. They are securing the large bolts that hold the platform securely in place on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker solders a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. 40 CFR 60.14 - Modification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... physical change, or change in the method of operation, at an existing electric utility steam generating... projects that are awarded funding from the Department of Energy as permanent clean coal technology... installation, operation, cessation, or removal of a temporary clean coal technology demonstration project is...

  13. 49 CFR 236.923 - Task analysis and basic requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... classroom, simulator, computer-based, hands-on, or other formally structured training and testing, except... for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements...) Based on a formal task analysis, identify the installation, maintenance, repair, modification...

  14. AGOR 28

    DTIC Science & Technology

    2016-01-17

    sea trials 5 Spill pipe modification for chain locker installed. This should increase chain wrap around windlass. Divers cleaned hull...the ladder coming up from main to focstle deck and near the entrance to the deck locker stbd side forward. In the case of the deck locker moving

  15. 48 CFR 217.171 - Multiyear contracts for services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agency may enter into multiyear contracts for supplies and services required for management, maintenance..., maintenance, and support of facilities and installations. (ii) Maintenance or modification of aircraft, ships... services (e.g., ground maintenance, in-plane refueling, bus transportation, and refuse collection and...

  16. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  17. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  18. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  19. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  20. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  1. ASTROPOP: ASTROnomical Polarimetry and Photometry pipeline

    NASA Astrophysics Data System (ADS)

    Campagnolo, Julio C. N.

    2018-05-01

    AstroPoP reduces almost any CCD photometry and image polarimetry data. For photometry reduction, the code performs source finding, aperture and PSF photometry, astrometry calibration using different automated and non-automated methods and automated source identification and magnitude calibration based on online and local catalogs. For polarimetry, the code resolves linear and circular Stokes parameters produced by image beam splitter or polarizer polarimeters. In addition to the modular functions, ready-to-use pipelines based in configuration files and header keys are also provided with the code. AstroPOP was initially developed to reduce the IAGPOL polarimeter data installed at Observatório Pico dos Dias (Brazil).

  2. USE OF PELTIER COOLERS AS SOIL HEAT FLUX TRANSDUCERS.

    USGS Publications Warehouse

    Weaver, H.L.; Campbell, G.S.

    1985-01-01

    Peltier coolers were modified and calibrated to serve as soil heat flux transducers. The modification was to fill their interiors with epoxy. The average calibration constant on 21 units was 13. 6 plus or minus 0. 8 kW m** minus **2 V** minus **1 at 20 degree C. This sensitivity is about eight times that of the two thermopile transducers with which comparisons were made. The thermal conductivity of the Peltier cooler transducers was 0. 4 W m** minus **1 degree C** minus **1, which is comparable to that of dry soil.

  3. Atom-scale covalent electrochemical modification of single-layer graphene on SiC substrates by diaryliodonium salts

    DOE PAGES

    Gearba, Raluca I.; Mueller, Kory M.; Veneman, Peter A.; ...

    2015-05-09

    Owing to its high conductivity, graphene holds promise as an electrode for energy devices such as batteries and photovoltaics. However, to this end, the work function and doping levels in graphene need to be precisely tuned. One promising route for modifying graphene’s electronic properties is via controlled covalent electrochemical grafting of molecules. We show that by employing diaryliodonium salts instead of the commonly used diazonium salts, spontaneous functionalization is avoided. This then allows for precise tuning of the grafting density. Moreover, by employing bis(4-nitrophenyl)iodonium(III) tetrafluoroborate (DNP) salt calibration curves, the surface functionalization density (coverage) of glassy carbon was controlled usingmore » cyclic voltammetry in varying salt concentrations. These electro-grafting conditions and calibration curves translated directly over to modifying single layer epitaxial graphene substrates (grown on insulating 6H-SiC (0 0 0 1)). In addition to quantifying the functionalization densities using electrochemical methods, samples with low grafting densities were characterized by low-temperature scanning tunneling microscopy (LT-STM). We show that the use of buffer-layer free graphene substrates is required for clear observation of the nitrophenyl modifications. Furthermore, atomically-resolved STM images of single site modifications were obtained, showing no preferential grafting at defect sites or SiC step edges as supposed previously in the literature. Most of the grafts exhibit threefold symmetry, but occasional extended modifications (larger than 4 nm) were observed as well.« less

  4. Investigation of Workplace-like Calibration Fields via a Deuterium-Tritium (D-T) Neutron Generator.

    PubMed

    Mozhayev, Andrey V; Piper, Roman K; Rathbone, Bruce A; McDonald, Joseph C

    2017-04-01

    Radiation survey meters and personal dosimeters are typically calibrated in reference neutron fields based on conventional radionuclide sources, such as americium-beryllium (Am-Be) or californium-252 (Cf), either unmodified or heavy-water moderated. However, these calibration neutron fields differ significantly from the workplace fields in which most of these survey meters and dosimeters are being used. Although some detectors are designed to yield an approximately dose-equivalent response over a particular neutron energy range, the response of other detectors is highly dependent upon neutron energy. This, in turn, can result in significant over- or underestimation of the intensity of neutron radiation and/or personal dose equivalent determined in the work environment. The use of simulated workplace neutron calibration fields that more closely match those present at the workplace could improve the accuracy of worker, and workplace, neutron dose assessment. This work provides an overview of the neutron fields found around nuclear power reactors and interim spent fuel storage installations based on available data. The feasibility of producing workplace-like calibration fields in an existing calibration facility has been investigated via Monte Carlo simulations. Several moderating assembly configurations, paired with a neutron generator using the deuterium tritium (D-T) fusion reaction, were explored.

  5. Improvements in absolute seismometer sensitivity calibration using local earth gravity measurements

    USGS Publications Warehouse

    Anthony, Robert E.; Ringler, Adam; Wilson, David

    2018-01-01

    The ability to determine both absolute and relative seismic amplitudes is fundamentally limited by the accuracy and precision with which scientists are able to calibrate seismometer sensitivities and characterize their response. Currently, across the Global Seismic Network (GSN), errors in midband sensitivity exceed 3% at the 95% confidence interval and are the least‐constrained response parameter in seismic recording systems. We explore a new methodology utilizing precise absolute Earth gravity measurements to determine the midband sensitivity of seismic instruments. We first determine the absolute sensitivity of Kinemetrics EpiSensor accelerometers to 0.06% at the 99% confidence interval by inverting them in a known gravity field at the Albuquerque Seismological Laboratory (ASL). After the accelerometer is calibrated, we install it in its normal configuration next to broadband seismometers and subject the sensors to identical ground motions to perform relative calibrations of the broadband sensors. Using this technique, we are able to determine the absolute midband sensitivity of the vertical components of Nanometrics Trillium Compact seismometers to within 0.11% and Streckeisen STS‐2 seismometers to within 0.14% at the 99% confidence interval. The technique enables absolute calibrations from first principles that are traceable to National Institute of Standards and Technology (NIST) measurements while providing nearly an order of magnitude more precision than step‐table calibrations.

  6. Model calibration of a variable refrigerant flow system with a dedicated outdoor air system: A case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Dongsu; Cox, Sam J.; Cho, Heejin

    With increased use of variable refrigerant flow (VRF) systems in the U.S. building sector, interests in capability and rationality of various building energy modeling tools to simulate VRF systems are rising. This paper presents the detailed procedures for model calibration of a VRF system with a dedicated outdoor air system (DOAS) by comparing to detailed measured data from an occupancy emulated small office building. The building energy model is first developed based on as-built drawings, and building and system characteristics available. The whole building energy modeling tool used for the study is U.S. DOE’s EnergyPlus version 8.1. The initial modelmore » is, then, calibrated with the hourly measured data from the target building and VRF-DOAS system. In a detailed calibration procedures of the VRF-DOAS, the original EnergyPlus source code is modified to enable the modeling of the specific VRF-DOAS installed in the building. After a proper calibration during cooling and heating seasons, the VRF-DOAS model can reasonably predict the performance of the actual VRF-DOAS system based on the criteria from ASHRAE Guideline 14-2014. The calibration results show that hourly CV-RMSE and NMBE would be 15.7% and 3.8%, respectively, which is deemed to be calibrated. As a result, the whole-building energy usage after calibration of the VRF-DOAS model is 1.9% (78.8 kWh) lower than that of the measurements during comparison period.« less

  7. Fermentation process tracking through enhanced spectral calibration modeling.

    PubMed

    Triadaphillou, Sophia; Martin, Elaine; Montague, Gary; Norden, Alison; Jeffkins, Paul; Stimpson, Sarah

    2007-06-15

    The FDA process analytical technology (PAT) initiative will materialize in a significant increase in the number of installations of spectroscopic instrumentation. However, to attain the greatest benefit from the data generated, there is a need for calibration procedures that extract the maximum information content. For example, in fermentation processes, the interpretation of the resulting spectra is challenging as a consequence of the large number of wavelengths recorded, the underlying correlation structure that is evident between the wavelengths and the impact of the measurement environment. Approaches to the development of calibration models have been based on the application of partial least squares (PLS) either to the full spectral signature or to a subset of wavelengths. This paper presents a new approach to calibration modeling that combines a wavelength selection procedure, spectral window selection (SWS), where windows of wavelengths are automatically selected which are subsequently used as the basis of the calibration model. However, due to the non-uniqueness of the windows selected when the algorithm is executed repeatedly, multiple models are constructed and these are then combined using stacking thereby increasing the robustness of the final calibration model. The methodology is applied to data generated during the monitoring of broth concentrations in an industrial fermentation process from on-line near-infrared (NIR) and mid-infrared (MIR) spectrometers. It is shown that the proposed calibration modeling procedure outperforms traditional calibration procedures, as well as enabling the identification of the critical regions of the spectra with regard to the fermentation process.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Audette, L.G.

    As originally conceived, the project called for modification of existing, commercially available stoker components. We experienced substantial delays in procurement, caused by supply backlogs and a major fire at the plant which ultimately provided the main stoker frame. Added to the problems was the bankruptcy of the L.W. Gay Stoveworks, where the project was to be located. Ultimately, parts were assembled and a combustion chamber was constructed at the Leyden Energy Corporation of Shelburne Falls, Massachusetts. A firing chamber with provision for measuring various physical and combustion parameters was constructed. The stoker, with appropriate modifications, was installed. Combustion analysis equipmentmore » was procured, and coal and wood pellets were stoked in order to test the effectiveness of the modifications. This report describes the configuration of the demonstration stoker and its modifications, as well as the testing exercise performed over the course of the project. 10 figs.« less

  9. Implementation Aspects of Flood Warning and Preparedness Planning Alternatives

    DTIC Science & Technology

    1981-08-01

    committees, and the Congress as a whole was on these other provisions which traditionally are regarded as bread and butter items by influential interests...near Shea Blvd. in Scottsdale. 7-23 iy.i.• I I I " I I I I I ’n , -. ... . .. 2• 3. Purchase, installation, calibration, opera- tion, servicing and

  10. In Search of Cosmic Rays: A Student Physics Project Aimed at Finding the Origin of Cosmic Rays.

    ERIC Educational Resources Information Center

    Antonelli, Jamie; Mahoney, Sean; Streich, Derek; Liebl, Michael

    2001-01-01

    Describes an ongoing project, the Cosmic Ray Observatory Project (CROP), being conducted by the University of Nebraska in partnership with several high schools. Each school group has installed cosmic ray detectors, and initial activities have included calibrating equipment, gathering preliminary data, and learning about cosmic ray showers. Aims to…

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khan, Yasin; Khare, Vaibhav Rai; Mathur, Jyotirmay

    The paper describes a parametric study developed to estimate the energy savings potential of a radiant cooling system installed in a commercial building in India. The study is based on numerical modeling of a radiant cooling system installed in an Information Technology (IT) office building sited in the composite climate of Hyderabad. To evaluate thermal performance and energy consumption, simulations were carried out using the ANSYS FLUENT and EnergyPlus softwares, respectively. The building model was calibrated using the measured data for the installed radiant system. Then this calibrated model was used to simulate the energy consumption of a building usingmore » a conventional all-air system to determine the proportional energy savings. For proper handling of the latent load, a dedicated outside air system (DOAS) was used as an alternative to Fan Coil Unit (FCU). A comparison of energy consumption calculated that the radiant system was 17.5 % more efficient than a conventional all-air system and that a 30% savings was achieved by using a DOAS system compared with a conventional system. Computational Fluid Dynamics (CFD) simulation was performed to evaluate indoor air quality and thermal comfort. It was found that a radiant system offers more uniform temperatures, as well as a better mean air temperature range, than a conventional system. To further enhance the energy savings in the radiant system, different operational strategies were analyzed based on thermal analysis using EnergyPlus. Lastly, the energy savings achieved in this parametric run were more than 10% compared with a conventional all-air system.« less

  12. Improvement of immunoassay detection system by using alternating current magnetic susceptibility

    NASA Astrophysics Data System (ADS)

    Kawabata, R.; Mizoguchi, T.; Kandori, A.

    2016-03-01

    A major goal with this research was to develop a low-cost and highly sensitive immunoassay detection system by using alternating current (AC) magnetic susceptibility. We fabricated an improved prototype of our previously developed immunoassay detection system and evaluated its performance. The prototype continuously moved sample containers by using a magnetically shielded brushless motor, which passes between two anisotropic magneto resistance (AMR) sensors. These sensors detected the magnetic signal in the direction where each sample container passed them. We used the differential signal obtained from each AMR sensor's output to improve the signal-to-noise ratio (SNR) of the magnetic signal measurement. Biotin-conjugated polymer beads with avidin-coated magnetic particles were prepared to examine the calibration curve, which represents the relation between AC magnetic susceptibility change and polymer-bead concentration. For the calibration curve measurement, we, respectively, measured the magnetic signal caused by the magnetic particles by using each AMR sensor installed near the upper or lower part in the lateral position of the passing sample containers. As a result, the SNR of the prototype was 4.5 times better than that of our previous system. Moreover, the data obtained from each AMR sensor installed near the upper part in the lateral position of the passing sample containers exhibited an accurate calibration curve that represented good correlation between AC magnetic susceptibility change and polymer-bead concentration. The conclusion drawn from these findings is that our improved immunoassay detection system will enable a low-cost and highly sensitive immunoassay.

  13. The 1997 HST Calibration Workshop with a New Generation of Instruments

    NASA Technical Reports Server (NTRS)

    Casertano, S. (Editor); Jedrzejewski, R. (Editor); Keyes, T. (Editor); Stevens, M. (Editor)

    1997-01-01

    The Second Servicing mission in early 1997 has brought major changes to the Hubble Space Telescope (HST). Two of the original instruments, Faint Object Spectrograph (FOS) and Goddard High Resolution Spectrograph (GHRS), were taken out, and replaced by completely new instruments, the Space Telescope Imaging Spectrograph (STIS) and the Near Infrared Camera Multi-Object Spectrograph (NICMOS). Two new types of detectors were installed, and for the first time, HST gained infrared capabilities. A new Fine Guidance Sensor (FGS) was installed, with an alignment mechanism that could improve substantially both guiding and astrometric capabilities. With all these changes come new challenges. The characterization of the new instruments has required a major effort, both by their respective Investigation Definition Teams and at the Space Telescope Science Institute. All necessary final calibrations for the retired spectrographs needed to be carried out, and their properties definitively characterized. At the same time, work has continued to improve our understanding of the instruments that have remained on board. The results of these activities were discussed in the 1997 HST (Hubble Space Telescope) Calibration Workshop. The main focus of the Workshop was to provide users with the tools and the understanding they need to use HST's instruments and archival data to the best of their possibilities. This book contains the written record of the Workshop. As such, it should provide a valuable tool to all interested in using existing HST data or in proposing for new observations.

  14. Design, installation, and performance evaluation of a custom dye matrix standard for automated capillary electrophoresis.

    PubMed

    Cloete, Kevin Wesley; Ristow, Peter Gustav; Kasu, Mohaimin; D'Amato, Maria Eugenia

    2017-03-01

    CE equipment detects and deconvolutes mixtures containing up to six fluorescently labeled DNA fragments. This deconvolution is done by the collection software that requires a spectral calibration file. The calibration file is used to adjust for the overlap that occurs between the emission spectra of fluorescence dyes. All commercial genotyping and sequencing kits require the installation of a corresponding matrix standard to generate a calibration file. Due to the differences in emission spectrum overlap between fluorescent dyes, the application of existing commercial matrix standards to the electrophoretic separation of DNA labeled with other fluorescent dyes can yield undesirable results. Currently, the number of fluorescent dyes available for oligonucleotide labeling surpasses the availability of commercial matrix standards. Therefore, in this study we developed and evaluated a customized matrix standard using ATTO 633, ATTO 565, ATTO 550, ATTO Rho6G, and 6-FAM dyes for which no commercial matrix standard is available. We highlighted the potential genotyping errors of using an incorrect matrix standard by evaluating the relative performance of our custom dye set using six matrix standards. The specific performance of two genotyping kits (UniQTyper™ Y-10 version 1.0 and PowerPlex® Y23 System) was also evaluated using their specific matrix standards. The procedure we followed for the construction of our custom dye matrix standard can be extended to other fluorescent dyes. © 2016 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  15. Improvement of immunoassay detection system by using alternating current magnetic susceptibility.

    PubMed

    Kawabata, R; Mizoguchi, T; Kandori, A

    2016-03-01

    A major goal with this research was to develop a low-cost and highly sensitive immunoassay detection system by using alternating current (AC) magnetic susceptibility. We fabricated an improved prototype of our previously developed immunoassay detection system and evaluated its performance. The prototype continuously moved sample containers by using a magnetically shielded brushless motor, which passes between two anisotropic magneto resistance (AMR) sensors. These sensors detected the magnetic signal in the direction where each sample container passed them. We used the differential signal obtained from each AMR sensor's output to improve the signal-to-noise ratio (SNR) of the magnetic signal measurement. Biotin-conjugated polymer beads with avidin-coated magnetic particles were prepared to examine the calibration curve, which represents the relation between AC magnetic susceptibility change and polymer-bead concentration. For the calibration curve measurement, we, respectively, measured the magnetic signal caused by the magnetic particles by using each AMR sensor installed near the upper or lower part in the lateral position of the passing sample containers. As a result, the SNR of the prototype was 4.5 times better than that of our previous system. Moreover, the data obtained from each AMR sensor installed near the upper part in the lateral position of the passing sample containers exhibited an accurate calibration curve that represented good correlation between AC magnetic susceptibility change and polymer-bead concentration. The conclusion drawn from these findings is that our improved immunoassay detection system will enable a low-cost and highly sensitive immunoassay.

  16. A fast RCS accuracy assessment method for passive radar calibrators

    NASA Astrophysics Data System (ADS)

    Zhou, Yongsheng; Li, Chuanrong; Tang, Lingli; Ma, Lingling; Liu, QI

    2016-10-01

    In microwave radar radiometric calibration, the corner reflector acts as the standard reference target but its structure is usually deformed during the transportation and installation, or deformed by wind and gravity while permanently installed outdoor, which will decrease the RCS accuracy and therefore the radiometric calibration accuracy. A fast RCS accuracy measurement method based on 3-D measuring instrument and RCS simulation was proposed in this paper for tracking the characteristic variation of the corner reflector. In the first step, RCS simulation algorithm was selected and its simulation accuracy was assessed. In the second step, the 3-D measuring instrument was selected and its measuring accuracy was evaluated. Once the accuracy of the selected RCS simulation algorithm and 3-D measuring instrument was satisfied for the RCS accuracy assessment, the 3-D structure of the corner reflector would be obtained by the 3-D measuring instrument, and then the RCSs of the obtained 3-D structure and corresponding ideal structure would be calculated respectively based on the selected RCS simulation algorithm. The final RCS accuracy was the absolute difference of the two RCS calculation results. The advantage of the proposed method was that it could be applied outdoor easily, avoiding the correlation among the plate edge length error, plate orthogonality error, plate curvature error. The accuracy of this method is higher than the method using distortion equation. In the end of the paper, a measurement example was presented in order to show the performance of the proposed method.

  17. Test Plan for a Calibration Demonstration System for the Reflected Solar Instrument for the Climate Absolute Radiance and Refractivity Observatory

    NASA Technical Reports Server (NTRS)

    Thome, Kurtis; McCorkel, Joel; Hair, Jason; McAndrew, Brendan; Daw, Adrian; Jennings, Donald; Rabin, Douglas

    2012-01-01

    The Climate Absolute Radiance and Refractivity Observatory (CLARREO) mission addresses the need to observe high-accuracy, long-term climate change trends and to use decadal change observations as the most critical method to determine the accuracy of climate change. One of the major objectives of CLARREO is to advance the accuracy of SI traceable absolute calibration at infrared and reflected solar wavelengths. This advance is required to reach the on-orbit absolute accuracy required to allow climate change observations to survive data gaps while remaining sufficiently accurate to observe climate change to within the uncertainty of the limit of natural variability. While these capabilities exist at NIST in the laboratory, there is a need to demonstrate that it can move successfully from NIST to NASA and/or instrument vendor capabilities for future spaceborne instruments. The current work describes the test plan for the Solar, Lunar for Absolute Reflectance Imaging Spectroradiometer (SOLARIS) which is the calibration demonstration system (CDS) for the reflected solar portion of CLARREO. The goal of the CDS is to allow the testing and evaluation of calibration approaches , alternate design and/or implementation approaches and components for the CLARREO mission. SOLARIS also provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result of efforts with the SOLARIS CDS will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections. The CLARREO mission addresses the need to observe high-accuracy, long-term climate change trends and advance the accuracy of SI traceable absolute calibration. The current work describes the test plan for the SOLARIS which is the calibration demonstration system for the reflected solar portion of CLARREO. SOLARIS provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections.

  18. Refan program. Phase 1: Summary report

    NASA Technical Reports Server (NTRS)

    Sams, E. W.; Bresnahan, D. L.

    1973-01-01

    The Refan Program is aimed at a large reduction in aircraft approach and takeoff noise in the vicinity of airports caused by the JT3D-powered 707's and DC-8's and the JT8D-powered 727's, 737's and DC-9's. These aircraft represent a major part of the existing commercial fleet. The noise reductions can be achieved by engine and nacelle modifications in the form of aircraft retrofit kits. Engine turbomachinery noise is reduced by replacing the current two-stage fan with a larger single-stage fan and by nacelle acoustic treatment. Jet noise is reduced by the reduction on jet velocity caused by additional turbine work extraction to drive the larger bypass fan. The predicted net effect of these modifications on installed performance is large noise reductions on both approach and takeoff, increased takeoff thrust, decreased takeoff field length, and maintained or improved aircraft range depending on the amount of acoustic treatment included. The Refan Program is being conducted in two phases under contracts with one engine and two airframe companies. Results of the Phase I work are summarized in this report which describes the refan nacelle configurations studied, the airplane modifications required to install the nacelles, and the resulting airplane performance and noise reductions predicted for all five aircraft.

  19. Wind-Tunnel Investigation of the Effects on the Aerodynamic Characteristics of Modifications to a Model of a Bomb Mounted on a Wing-Fuselage Model and to a Model of the Bomb Alone

    NASA Technical Reports Server (NTRS)

    King, Thomas J., Jr.

    1954-01-01

    An investigation was conducted in the Langley high-speed 7- by 10-foot tunnel to determine effects of modifications to a bomb model (particularly with regard to drag) when mounted on a wing-fuselage model and tested at Mach numbers from 0.70 to 1.10. In addition, the static longitudinal stability characteristics of several configurations of a larger scale model of the bomb alone were obtained over a Mach number range from 0.50 to 0.95. The results obtained for the wing-fuselage-bomb model indicate that large reductions in installation drag were obtained for the wing-fuselage-bomb model when the flat nose of the basic bomb was replaced by rounded or pointed noses of various calibers. Shortening the mounting pylon gave further decreases in the installation drag. The tests of the bomb alone indicated that only the flat-nose configurations were stable over the greater part of the Mach number range. Nose-shape modifications which improved the drag also caused the bombs to become unstable at low angles of attack. The stability of the low-drag bomb configurations could be improved by lengthening the cylindrical portion of the body behind the center of gravity.

  20. KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician moves a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”

    NASA Image and Video Library

    2003-08-27

    KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician moves a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”

  1. KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician turns on a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”

    NASA Image and Video Library

    2003-08-27

    KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician turns on a switch. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”

  2. Adenosine methylation as a molecular imprint defining the fate of RNA.

    PubMed

    Knuckles, Philip; Bühler, Marc

    2018-05-21

    Multiple lines of evidence suggest the RNA modification N 6 -methyladonsine (m 6 A), which is installed in the nucleus co-transcriptionally and, thereafter, serves as a reversible chemical imprint that influences several steps of mRNA metabolism. This includes but is not limited to RNA folding, splicing, stability, transport, and translation. In this Review we focus on the current view of the nuclear installation of m 6 A as well the molecular players involved, the so called m 6 A writers. We also explore the effector proteins, or m 6 A readers, that decode the imprint in different cellular contexts and compartments, and ultimately, the way the modification influences the lifecycle of an RNA molecule. The wide evolutionary conservation of m 6 A and its critical role in physiology and disease warrants further studies into this burgeoning and exciting field. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  3. Calibration of Thomson scattering system on VEST

    NASA Astrophysics Data System (ADS)

    Kim, Y.-G.; Lee, J.-H.; Kim, D.; Yoo, M.-G.; Lee, H.; Hwang, Y. S.; Na, Y.-S.

    2017-12-01

    The Thomson scattering system has been recently installed on Versatile Experiment Spherical Torus (VEST) to measure the electron temperature and the density of the core plasmas. Since the calibration of the system is required for the accurate measurement of these parameters, a polychromator and the system efficiency are calibrated. The bias voltage of the detector is optimized and the relative responsivity of the polychromator is measured to analyse the spectral broadening. The tendency of decreasing responsivity because of the ambient temperature change is addressed together. The efficiencies of the alignments using HeNe laser and Nd:YAG laser are compared. After the alignment using Rayleigh scattering, it is improved ~ 7 times while the peak signal of the stray light is decreased. To evaluate the efficiencies of the alignment using HeNe laser, it is compared with the efficiency of the fine alignment by Rayleigh scattering. After absolute calibration is done, the Thomson scattering signal is estimated theoretically. The Bayesian analysis is tried using the synthetic data, and the results show that the input temperature and the density are inside the contour of the 90% confident level. The calibrated Thomson scattering system will provide the meaningful information of the core plasma of the VEST.

  4. Structural disorder of graphite and implications for graphite thermometry

    NASA Astrophysics Data System (ADS)

    Kirilova, Martina; Toy, Virginia; Rooney, Jeremy S.; Giorgetti, Carolina; Gordon, Keith C.; Collettini, Cristiano; Takeshita, Toru

    2018-02-01

    Graphitization, or the progressive maturation of carbonaceous material, is considered an irreversible process. Thus, the degree of graphite crystallinity, or its structural order, has been calibrated as an indicator of the peak metamorphic temperatures experienced by the host rocks. However, discrepancies between temperatures indicated by graphite crystallinity versus other thermometers have been documented in deformed rocks. To examine the possibility of mechanical modifications of graphite structure and the potential impacts on graphite thermometry, we performed laboratory deformation experiments. We sheared highly crystalline graphite powder at normal stresses of 5 and 25 megapascal (MPa) and aseismic velocities of 1, 10 and 100 µm s-1. The degree of structural order both in the starting and resulting materials was analyzed by Raman microspectroscopy. Our results demonstrate structural disorder of graphite, manifested as changes in the Raman spectra. Microstructural observations show that brittle processes caused the documented mechanical modifications of the aggregate graphite crystallinity. We conclude that the calibrated graphite thermometer is ambiguous in active tectonic settings.

  5. KSC-98pc1164

    NASA Image and Video Library

    1998-09-28

    The orbiter Atlantis is towed away from the Shuttle Landing Facility after returning home from California atop its Shuttle Carrier Aircraft. The orbiter spent 10 months in Palmdale undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  6. A low-cost and portable realization on fringe projection three-dimensional measurement

    NASA Astrophysics Data System (ADS)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2015-12-01

    Fringe projection three-dimensional measurement is widely applied in a wide range of industrial application. The traditional fringe projection system has the disadvantages of high expense, big size, and complicated calibration requirements. In this paper we introduce a low-cost and portable realization on three-dimensional measurement with Pico projector. It has the advantages of low cost, compact physical size, and flexible configuration. For the proposed fringe projection system, there is no restriction to camera and projector's relative alignment on parallelism and perpendicularity for installation. Moreover, plane-based calibration method is adopted in this paper that avoids critical requirements on calibration system such as additional gauge block or precise linear z stage. What is more, error sources existing in the proposed system are introduced in this paper. The experimental results demonstrate the feasibility of the proposed low cost and portable fringe projection system.

  7. Improved design and in-situ measurements of new beam position monitors for Indus-2

    NASA Astrophysics Data System (ADS)

    Kumar, M.; Babbar, L. K.; Holikatti, A. C.; Yadav, S.; Tyagi, Y.; Puntambekar, T. A.; Senecha, V. K.

    2018-01-01

    Beam position monitors (BPM) are important diagnostic devices used in particle accelerators to monitor position of the beam for various applications. Improved version of button electrode BPM has been designed using CST Studio Suite for Indus-2 ring. The new BPMs are designed to replace old BPMs which were designed and installed more than 12 years back. The improved BPMs have higher transfer impedance, resonance free output signal, equal sensitivity in horizontal and vertical planes and fast decaying wakefield as compared to old BPMs. The new BPMs have been calibrated using coaxial wire method. Measurement of transfer impedance and time domain signals has also been performed in-situ with electron beam during Indus-2 operation. The calibration and beam based measurements results showed close agreement with the design parameters. This paper presents design, electromagnetic simulations, calibration result and in-situ beam based measurements of newly designed BPMs.

  8. Auto-Calibration and Fault Detection and Isolation of Skewed Redundant Accelerometers in Measurement While Drilling Systems.

    PubMed

    Seyed Moosavi, Seyed Mohsen; Moaveni, Bijan; Moshiri, Behzad; Arvan, Mohammad Reza

    2018-02-27

    The present study designed skewed redundant accelerometers for a Measurement While Drilling (MWD) tool and executed auto-calibration, fault diagnosis and isolation of accelerometers in this tool. The optimal structure includes four accelerometers was selected and designed precisely in accordance with the physical shape of the existing MWD tool. A new four-accelerometer structure was designed, implemented and installed on the current system, replacing the conventional orthogonal structure. Auto-calibration operation of skewed redundant accelerometers and all combinations of three accelerometers have been done. Consequently, biases, scale factors, and misalignment factors of accelerometers have been successfully estimated. By defecting the sensors in the new optimal skewed redundant structure, the fault was detected using the proposed FDI method and the faulty sensor was diagnosed and isolated. The results indicate that the system can continue to operate with at least three correct sensors.

  9. Auto-Calibration and Fault Detection and Isolation of Skewed Redundant Accelerometers in Measurement While Drilling Systems

    PubMed Central

    Seyed Moosavi, Seyed Mohsen; Moshiri, Behzad; Arvan, Mohammad Reza

    2018-01-01

    The present study designed skewed redundant accelerometers for a Measurement While Drilling (MWD) tool and executed auto-calibration, fault diagnosis and isolation of accelerometers in this tool. The optimal structure includes four accelerometers was selected and designed precisely in accordance with the physical shape of the existing MWD tool. A new four-accelerometer structure was designed, implemented and installed on the current system, replacing the conventional orthogonal structure. Auto-calibration operation of skewed redundant accelerometers and all combinations of three accelerometers have been done. Consequently, biases, scale factors, and misalignment factors of accelerometers have been successfully estimated. By defecting the sensors in the new optimal skewed redundant structure, the fault was detected using the proposed FDI method and the faulty sensor was diagnosed and isolated. The results indicate that the system can continue to operate with at least three correct sensors. PMID:29495434

  10. Venturi air-jet vacuum ejectors for high-volume atmospheric sampling on aircraft platforms

    NASA Technical Reports Server (NTRS)

    Hill, Gerald F.; Sachse, Glen W.; Young, Douglas C.; Wade, Larry O.; Burney, Lewis G.

    1992-01-01

    Documentation of the installation and use of venturi air-jet vacuum ejectors for high-volume atmospheric sampling on aircraft platforms is presented. Information on the types of venturis that are useful for meeting the pumping requirements of atmospheric-sampling experiments is also presented. A description of the configuration and installation of the venturi system vacuum line is included with details on the modifications that were made to adapt a venturi to the NASA Electra aircraft at GSFC, Wallops Flight Facility. Flight test results are given for several venturis with emphasis on applications to the Differential Absorption Carbon Monoxide Measurement (DACOM) system at LaRC. This is a source document for atmospheric scientists interested in using the venturi systems installed on the NASA Electra or adapting the technology to other aircraft.

  11. 47 CFR 27.1180 - The cost-sharing formula.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...); towers and/or modifications; back-up power equipment; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works... as equipment and engineering expenses. There is no cap on the actual costs of relocation. (c) An AWS...

  12. 47 CFR 2.1043 - Changes in certificated equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... permissive change includes modifications to the software of a software defined radio transmitter that change... compliance with the other provisions of this section. Changes to the software installed in a transmitter that... complies with the applicable rules with the new software loaded, including compliance with the applicable...

  13. 47 CFR 2.1043 - Changes in certificated equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... permissive change includes modifications to the software of a software defined radio transmitter that change... compliance with the other provisions of this section. Changes to the software installed in a transmitter that... complies with the applicable rules with the new software loaded, including compliance with the applicable...

  14. 47 CFR 2.1043 - Changes in certificated equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... permissive change includes modifications to the software of a software defined radio transmitter that change... compliance with the other provisions of this section. Changes to the software installed in a transmitter that... complies with the applicable rules with the new software loaded, including compliance with the applicable...

  15. 47 CFR 2.1043 - Changes in certificated equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... permissive change includes modifications to the software of a software defined radio transmitter that change... compliance with the other provisions of this section. Changes to the software installed in a transmitter that... complies with the applicable rules with the new software loaded, including compliance with the applicable...

  16. 47 CFR 2.1043 - Changes in certificated equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... permissive change includes modifications to the software of a software defined radio transmitter that change... compliance with the other provisions of this section. Changes to the software installed in a transmitter that... complies with the applicable rules with the new software loaded, including compliance with the applicable...

  17. Analysis of energy conservation alternatives for standard Army building. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hittle, D.C.; O'Brien, R.E.; Percivall, G.S.

    1983-03-01

    This report describes energy conservation alternatives for five standard Army building designs. By surveying maps of major Army installations and using the Integrated Facilities System, the most popular designs were determined to be a two-company, rolling-pin-shaped barracks for enlisted personnel; a Type 64 barracks; a motor repair shop; a battalion headquarters and classroom building; and an enlisted personnel mess hall. The Building Loads Analysis and System Thermodynamics (BLAST) energy-analysis computer program was used to develop baseline energy consumption for each design based on the building descriptions and calibrated by comparison with the measured energy usage of similar buildings. Once themore » baseline was established, the BLAST program was used to study energy conservation alternatives (ECAs) which could be retrofit to the existing buildings. The ECAs included closing off air-handling units, adding storm windows, adding 2 in. (0.051 m) of exterior insulation to the walls, partially blocking the windows, adding roof insulation, putting up south overhangs, installing programmable thermostats, recovering heat from exhaust fans, installing temperature economizers, replacing lights, and installing partitions between areas of differing temperature.« less

  18. ATLAS Tile calorimeter calibration and monitoring systems

    NASA Astrophysics Data System (ADS)

    Chomont, Arthur; ATLAS Collaboration

    2017-11-01

    The ATLAS Tile Calorimeter (TileCal) is the central section of the hadronic calorimeter of the ATLAS experiment and provides important information for reconstruction of hadrons, jets, hadronic decays of tau leptons and missing transverse energy. This sampling calorimeter uses steel plates as absorber and scintillating tiles as active medium. The light produced by the passage of charged particles is transmitted by wavelength shifting fibres to photomultiplier tubes (PMTs), located on the outside of the calorimeter. The readout is segmented into about 5000 cells (longitudinally and transversally), each of them being read out by two PMTs in parallel. To calibrate and monitor the stability and performance of each part of the readout chain during the data taking, a set of calibration systems is used. The TileCal calibration system comprises cesium radioactive sources, Laser and charge injection elements, and allows for monitoring and equalization of the calorimeter response at each stage of the signal production, from scintillation light to digitization. Based on LHC Run 1 experience, several calibration systems were improved for Run 2. The lessons learned, the modifications, and the current LHC Run 2 performance are discussed.

  19. Effects of Hardened Low-Water Crossings on Periphyton and Water Quality in Selected Streams at the Fort Polk Military Reservation, Louisiana, 1998-99 and 2003-04

    USGS Publications Warehouse

    Bryan, Barbara W.; Bryan, C. Frederick; Lovelace, John K.; Tollett, Roland W.

    2007-01-01

    In 2003, the U.S. Geological Survey (USGS), at the request of the U.S. Army Joint Readiness Training Center and Fort Polk, began a follow-up study to determine whether installation and modification of hardened low-water crossings had short-term (less than 1 year) or long-term (greater than 1 year) effects on periphyton or water quality in five streams at the Fort Polk Military Reservation, Louisiana. Periphyton data were statistically analyzed for possible differences between samples collected at upstream and downstream sites and before and after low-water crossings were modified on three streams, Big Brushy Creek, Tributary to East Fork of Sixmile Creek, and Tributary to Birds Creek, during 2003?04. Periphyton data also were analyzed for possible differences between samples collected at upstream and downstream sites on two streams, Tributary to Big Brushy Creek and Little Brushy Creek, during 1998?99 and 2003. Variations in periphyton communities could not be conclusively attributed to the modifications. Most of the significant changes in percent frequency of occurrence and average cell density of the 10 most frequently occurring periphyton taxa were increases at downstream sites after the hardened low-water crossing installations or modifications. However, these changes in the periphyton community are not necessarily deleterious to the community structure. Water-quality data collected from upstream and downstream sites on the five streams during 2003?04 were analyzed for possible differences caused by the hardened crossings. Generally, average water-quality values and concentrations were similar at upstream and downstream sites. When average water-quality values or concentrations changed significantly, they almost always changed significantly at both the upstream and downstream sites. It is probable that observed variations in water quality at both upstream and downstream sites are related to differences in rainfall and streamflow during the sample collection periods rather than an effect of the hardened low-water crossing installations or modifications, but additional study is needed.

  20. The HST/WFC3 Quicklook Project: A User Interface to Hubble Space Telescope Wide Field Camera 3 Data

    NASA Astrophysics Data System (ADS)

    Bourque, Matthew; Bajaj, Varun; Bowers, Ariel; Dulude, Michael; Durbin, Meredith; Gosmeyer, Catherine; Gunning, Heather; Khandrika, Harish; Martlin, Catherine; Sunnquist, Ben; Viana, Alex

    2017-06-01

    The Hubble Space Telescope's Wide Field Camera 3 (WFC3) instrument, comprised of two detectors, UVIS (Ultraviolet-Visible) and IR (Infrared), has been acquiring ~ 50-100 images daily since its installation in 2009. The WFC3 Quicklook project provides a means for instrument analysts to store, calibrate, monitor, and interact with these data through the various Quicklook systems: (1) a ~ 175 TB filesystem, which stores the entire WFC3 archive on disk, (2) a MySQL database, which stores image header data, (3) a Python-based automation platform, which currently executes 22 unique calibration/monitoring scripts, (4) a Python-based code library, which provides system functionality such as logging, downloading tools, database connection objects, and filesystem management, and (5) a Python/Flask-based web interface to the Quicklook system. The Quicklook project has enabled large-scale WFC3 analyses and calibrations, such as the monitoring of the health and stability of the WFC3 instrument, the measurement of ~ 20 million WFC3/UVIS Point Spread Functions (PSFs), the creation of WFC3/IR persistence calibration products, and many others.

  1. Experimental validation of a self-calibrating cryogenic mass flowmeter

    NASA Astrophysics Data System (ADS)

    Janzen, A.; Boersch, M.; Burger, B.; Drache, J.; Ebersoldt, A.; Erni, P.; Feldbusch, F.; Oertig, D.; Grohmann, S.

    2017-12-01

    The Karlsruhe Institute of Technology (KIT) and the WEKA AG jointly develop a commercial flowmeter for application in helium cryostats. The flowmeter functions according to a new thermal measurement principle that eliminates all systematic uncertainties and enables self-calibration during real operation. Ideally, the resulting uncertainty of the measured flow rate is only dependent on signal noises, which are typically very small with regard to the measured value. Under real operating conditions, cryoplant-dependent flow rate fluctuations induce an additional uncertainty, which follows from the sensitivity of the method. This paper presents experimental results with helium at temperatures between 30 and 70 K and flow rates in the range of 4 to 12 g/s. The experiments were carried out in a control cryostat of the 2 kW helium refrigerator of the TOSKA test facility at KIT. Inside the cryostat, the new flowmeter was installed in series with a Venturi tube that was used for reference measurements. The measurement results demonstrate the self-calibration capability during real cryoplant operation. The influences of temperature and flow rate fluctuations on the self-calibration uncertainty are discussed.

  2. Evolution of the central safety factor during stabilized sawtooth instabilities at KSTAR

    NASA Astrophysics Data System (ADS)

    Messmer, M. C. C.; Ko, J.; Chung, J.; Woo, M. H.; Lee, K.-D.; Jaspers, R. J. E.

    2018-01-01

    A motional Stark effect (MSE) diagnostic has recently been installed in the KSTAR tokamak. A difficulty faced at KSTAR and common to other MSE diagnostics is calibration of the system for absolute measurements. In this report we present our novel calibration routine and discuss first results, evaluating the evolution of the the central safety factor during sawtooth instabilities. The calibration scheme ensures that the bandpass filters typically used in MSE systems are aligned correctly and identifies and removes systematic offsets present in the measurement. This is verified by comparing the reconstructed safety factor profile against various discharges where the locations of rational q surfaces have been obtained from MHD markers. The calibration is applied to analyse the evolution of q 0 in a shot where the sawteeth are stabilized by neutral beam injection. Within the analysed sawtooth periods q 0 drops below unity during the quiescent phase and relaxes close to or slightly above unity at the sawtooth crash. This finding is in line with the classical Kadomtsev model of full magnetic reconnection and earlier findings at JET.

  3. On the concept of virtual current as a means to enhance verification of electromagnetic flowmeters

    NASA Astrophysics Data System (ADS)

    Baker, Roger C.

    2011-10-01

    Electromagnetic flowmeters are becoming increasingly widely used in the water industry and other industries which handle electrically conducting liquids. When installed they are often difficult to remove for calibration without disturbing the liquid flow. Interest has therefore increased in the possibility of in situ calibration. The result has been the development of verification which attempts to approach calibration. However, while it checks on magnetic field and amplification circuits, it does not check adequately on the internals of the flowmeter pipe. This paper considers the use of the virtual voltage, a key element of the weight function theory of the flowmeter, to identify changes which have occurred in the flow tube and its liner. These could include a deformed insulating liner to the flow tube, or a deposit in the tube resulting from solids in the flow. The equation for virtual voltage is solved using a finite difference approach and the results are checked using a tank to simulate the flow tube, and tests on a flow rig. The concept is shown to be promising as a means of approaching verification of calibration.

  4. A rubidium traced white-light etalon calibrator for MAROON-X

    NASA Astrophysics Data System (ADS)

    Stürmer, Julian; Seifahrt, Andreas; Schwab, Christian; Bean, Jacob L.

    2016-07-01

    We report on the construction and testing of a vacuum-gap Fabry-Perot etalon calibrator for high precision radial velocity spectrographs. The etalon is referenced against hyper fine transitions of rubidium to provide a precise wavelength calibrator for MAROON-X, a new fiber-fed, red-optical, high-precision radial-velocity spectrograph currently under construction for one of the twin 6.5m Magellan Telescopes in Chile. We demonstrate a turnkey system, ready to be installed at any current and next generation radial velocity spectrograph that requires calibration over a wide spectral band-pass. Uncertainties in the position of one etalon line are at the 10 cm s-1 level in individual measurements taken at 4 Hz. Our long-term stability is mainly limited by aging effects of the spacer material Zerodur, which imprints a 12 cm s-1 daily drift. However, as the etalon position is traced by the rubidium reference with a precision of <3 cm s-1 for integration times longer than 10s, we can fully account for this effect at the RV data reduction level.

  5. Hanford Waste End Effector Phase I Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berglin, Eric J.; Hatchell, Brian K.; Mount, Jason C.

    This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions’ Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This effort fulfills the informational needs for initial assessment of the HWEE to support Hanford single-shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install and calibrate instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulantsmore » to determine pumping rate, dilution factors, and screen fouling rate.« less

  6. Measuring water and sediment discharge from a road plot with a settling basin and tipping bucket

    Treesearch

    Thomas A. Black; Charles H. Luce

    2013-01-01

    A simple empirical method quantifies water and sediment production from a forest road surface, and is well suited for calibration and validation of road sediment models. To apply this quantitative method, the hydrologic technician installs bordered plots on existing typical road segments and measures coarse sediment production in a settling tank. When a tipping bucket...

  7. Shortwave Radiometer Calibration Methods Comparison and Resulting Solar Irradiance Measurement Differences: A User Perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Habte, Aron; Sengupta, Manajit; Andreas, Afshin

    Banks financing solar energy projects require assurance that these systems will produce the energy predicted. Furthermore, utility planners and grid system operators need to understand the impact of the variable solar resource on solar energy conversion system performance. Accurate solar radiation data sets reduce the expense associated with mitigating performance risk and assist in understanding the impacts of solar resource variability. The accuracy of solar radiation measured by radiometers depends on the instrument performance specification, installation method, calibration procedure, measurement conditions, maintenance practices, location, and environmental conditions. This study addresses the effect of different calibration methods provided by radiometric calibrationmore » service providers, such as NREL and manufacturers of radiometers, on the resulting calibration responsivity. Some of these radiometers are calibrated indoors and some outdoors. To establish or understand the differences in calibration methodology, we processed and analyzed field-measured data from these radiometers. This study investigates calibration responsivities provided by NREL's broadband outdoor radiometer calibration (BORCAL) and a few prominent manufacturers. The BORCAL method provides the outdoor calibration responsivity of pyranometers and pyrheliometers at 45 degree solar zenith angle, and as a function of solar zenith angle determined by clear-sky comparisons with reference irradiance. The BORCAL method also employs a thermal offset correction to the calibration responsivity of single-black thermopile detectors used in pyranometers. Indoor calibrations of radiometers by their manufacturers are performed using a stable artificial light source in a side-by-side comparison between the test radiometer under calibration and a reference radiometer of the same type. In both methods, the reference radiometer calibrations are traceable to the World Radiometric Reference (WRR). These different methods of calibration demonstrated +1% to +2% differences in solar irradiance measurement. Analyzing these differences will ultimately help determine the uncertainty of the field radiometer data and guide the development of a consensus standard for calibration. Further advancing procedures for precisely calibrating radiometers to world reference standards that reduce measurement uncertainty will allow more accurate prediction of solar output and improve the bankability of solar projects.« less

  8. Installation of a variable-angle spectrometer system for monitoring diffuse and global solar radiation

    NASA Astrophysics Data System (ADS)

    Ormachea, O.; Abrahamse, A.; Tolavi, N.; Romero, F.; Urquidi, O.; Pearce, J. M.; Andrews, R.

    2013-11-01

    We report on the design and installation of a spectrometer system for monitoring solar radiation in Cochabamba, Bolivia. Both the light intensity and the spectral distribution affect the power produced by a photovoltaic device. Local variations in the solar spectrum (especially compared to the AM1.5 standard) may have important implications for device optimization and energy yield estimation. The spectrometer system, based on an Ocean Optics USB4000 (300-900nm) spectrometer, was designed to increase functionality. Typically systems only record the global horizontal radiation. Our system moves a fiber-optic cable 0-90 degrees and takes measurements in 9 degree increments. Additionally, a shadow band allows measurement of the diffuse component of the radiation at each position. The electronic controls utilize an Arduino UNO microcontroller to synchronizes the movement of two PAP bipolar (stepper) motors with the activation of the spectrometer via an external trigger. The spectrometer was factory calibrated for wavelength and calibrated for absolute irradiance using a Sellarnet SL1-Cal light source. We present preliminary results from data taken March-June, 2013, and comment on implications for PV devices in Cochabamba.

  9. Acoustic Calibration of the Exterior Effects Room at the NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Faller, Kenneth J., II; Rizzi, Stephen A.; Klos, Jacob; Chapin, William L.; Surucu, Fahri; Aumann, Aric R.

    2010-01-01

    The Exterior Effects Room (EER) at the NASA Langley Research Center is a 39-seat auditorium built for psychoacoustic studies of aircraft community noise. The original reproduction system employed monaural playback and hence lacked sound localization capability. In an effort to more closely recreate field test conditions, a significant upgrade was undertaken to allow simulation of a three-dimensional audio and visual environment. The 3D audio system consists of 27 mid and high frequency satellite speakers and 4 subwoofers, driven by a real-time audio server running an implementation of Vector Base Amplitude Panning. The audio server is part of a larger simulation system, which controls the audio and visual presentation of recorded and synthesized aircraft flyovers. The focus of this work is on the calibration of the 3D audio system, including gains used in the amplitude panning algorithm, speaker equalization, and absolute gain control. Because the speakers are installed in an irregularly shaped room, the speaker equalization includes time delay and gain compensation due to different mounting distances from the focal point, filtering for color compensation due to different installations (half space, corner, baffled/unbaffled), and cross-over filtering.

  10. First light of a laser frequency comb at SALT

    NASA Astrophysics Data System (ADS)

    Depagne, Éric; McCracken, Richard A.; Reid, Derryck T.; Kuhn, Rudi B.; Erasmus, Nicolas; Crause, Lisa A.

    2016-08-01

    We present preliminary results of the commissioning and testing of SALT-CRISP (SALT-Calibration Ruler for Increased Spectrograph Precision), a Laser Frequency Comb (LFC) built by Heriot-Watt University and temporarily installed at the Southern African Large Telescope (SALT). The comb feeds the High Stability mode of SALT's High Resolution Spectrograph (HRS) and fully covers the wavelength range of the red channel of the HRS: 555-890 nm. The LFC provides significantly improved wavelength calibration compared to a standard Thorium-Argon (ThAr) lamp and hence offers unprecedented opportunities to characterise the resolution, stability and radial velocity precision of the HRS. Results from this field trial will be incorporated into subsequent LFC designs.

  11. Note: Rotaphone, a new self-calibrated six-degree-of-freedom seismic sensor

    USGS Publications Warehouse

    Brokešová, Johana; Málek, Jiří; Evans, John R.

    2012-01-01

    We have developed and tested (calibration, linearity, and cross-axis errors) a new six-degree-of-freedom mechanical seismic sensor for collocated measurements of three translational and three rotational ground motion velocity components. The device consists of standard geophones arranged in parallel pairs to detect spatial gradients. The instrument operates in a high-frequency range (above the natural frequency of the geophones, 4.5 Hz). Its theoretical sensitivity limit in this range is 10(-9) m/s in ground velocity and 10(-9) rad/s in rotation rate. Small size and weight, and easy installation and maintenance make the instrument useful for local-earthquake recording and seismic prospecting.

  12. Method for in-situ restoration of plantinum resistance thermometer calibration

    DOEpatents

    Carroll, Radford M.

    1989-01-01

    A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or strain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's.

  13. Method for in-situ restoration of platinum resistance thermometer calibration

    DOEpatents

    Carroll, R.M.

    1987-10-23

    A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or stain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's. 1 fig.

  14. Steps towards Improving GNSS Systematic Errors and Biases

    NASA Astrophysics Data System (ADS)

    Herring, T.; Moore, M.

    2017-12-01

    Four general areas of analysis method improvements, three related to data analysis models and the fourth to calibration methods, have been recommended at the recent unified analysis workshop (UAW) and we discuss aspects of these areas for improvement. The gravity fields used in the GNSS orbit integrations should be updated to match modern fields to make them consistent with the fields being used by the other IAG services. The update would include the static part of the field and a time variable component. The force models associated with radiation forces are the most uncertain and modeling of these forces can be made more consistent with the exchange of attitude information. The international GNSS service (IGS) will develop an attitude format and make attitude information available so that analysis centers can validate their models. The IGS has noted the appearance of the GPS draconitic period and harmonics of this period in time series of various geodetic products (e.g., positions and Earth orientation parameters). An updated short-period (diurnal and semidiurnal) model is needed and a method to determine the best model developed. The final area, not directly related to analysis models, is the recommendation that site dependent calibration of GNSS antennas are needed since these have a direct effect on the ITRF realization and position offsets when antennas are changed. Evaluation of the effects of the use of antenna specific phase center models will be investigated for those sites where these values are available without disturbing an existing antenna installation. Potential development of an in-situ antenna calibration system is strongly encouraged. In-situ calibration would be deployed at core sites where GNSS sites are tied to other geodetic systems. With recent expansion of the number of GPS satellites transmitting unencrypted codes on the GPS L2 frequency and the availability of software GNSS receivers in-situ calibration between an existing installation and a movable directional antenna is now more likely to generate accurate results than earlier analog switching systems. With all of these improvements, there is the expectation that there will be better agreement between the space geodetic methods thus allowing more definitive assessment and modeling of the Earth's time variable shape and gravity field.

  15. SITE PROGRAM APPLICATIONS ANALYSIS ASSESSMENT OF SUPERFUND APPLICATIONS FOR THE AMERICAN COMBUSTION INC. PYRETRON OXYGEN ENHANCED BURNER

    EPA Science Inventory

    Incineration is widely used to clean up Superfund sites. Modifications which improve the efficiency with which waste can be incinerated are therefore of interest to EPA. Oxygen/air burners are of interest because their installation on conventional incinerators can allow for signi...

  16. 47 CFR 74.651 - Equipment changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment changes. 74.651 Section 74.651... Stations § 74.651 Equipment changes. (a) Modifications may be made to an existing authorization in accordance with §§ 1.929 and 1.947 of this chapter. (b) Multiplexing equipment may be installed on any...

  17. 30 CFR 285.705 - When must I use a Certified Verification Agent (CVA)?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CVA)? 285.705 Section 285.705 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE... the Facility Design Report, the Fabrication and Installation Report, and the Project Modifications and...

  18. Logistics hardware and services control system

    NASA Technical Reports Server (NTRS)

    Koromilas, A.; Miller, K.; Lamb, T.

    1973-01-01

    Software system permits onsite direct control of logistics operations, which include spare parts, initial installation, tool control, and repairable parts status and control, through all facets of operations. System integrates logistics actions and controls receipts, issues, loans, repairs, fabrications, and modifications and assets in predicting and allocating logistics parts and services effectively.

  19. 76 FR 74665 - Airworthiness Directives; Bombardier, Inc. Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... Certificate (STC) ST00753NY (Transport Canada Civil Aviation (TCCA) STC SA97-106) installed. This AD results... unsafe condition as: It has been determined that modifications by DECA Aviation Engineering Limited on... INFORMATION: Discussion The Transport Canada Civil Aviation (TCCA), which is the aviation authority for Canada...

  20. Alternative Fuels Data Center

    Science.gov Websites

    Supply Equipment (EVSE) Policies for Residential and Commercial Renters The lessor of a dwelling or commercial property must approve written requests from a lessee to install EVSE at a parking space allotted commercial properties. All modifications and improvements must comply with federal, state, and local laws and

  1. 30 CFR 250.905 - How do I get approval for the installation, modification, or repair of my platform?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... foundations; drilling, production, and pipeline risers and riser tensioning systems; turrets and turret-and... component design; pile foundations; drilling, production, and pipeline risers and riser tensioning systems... Loads imposed by jacket; decks; production components; drilling, production, and pipeline risers, and...

  2. 30 CFR 250.905 - How do I get approval for the installation, modification, or repair of my platform?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... foundations; drilling, production, and pipeline risers and riser tensioning systems; turrets and turret-and... component design; pile foundations; drilling, production, and pipeline risers and riser tensioning systems... Loads imposed by jacket; decks; production components; drilling, production, and pipeline risers, and...

  3. 77 FR 67256 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    .... This AD requires either incorporating a design change to the rudder control system and/ or other systems, or installing a stop rudder inputs warning (SRIW) modification. We are issuing this AD to prevent... a design change to the rudder control system and/or other systems to address the unsafe condition...

  4. Analyzing Investments in Thin-Kerf Saws

    Treesearch

    Philip H. Steele; Philip A. Araman

    1996-01-01

    The rising cost of hardwood sawlogs has increasd sawmill managers' interest in considering the installation of thin-kerf sawing machines in their sawmills. Replacement of circular headrigs by band headrigs and/or reducing resaw kerfs are the available options. Equipment replacement or modification to achieve thin-kerf sawing will require an investment. Sawmill...

  5. The 40-kw field test power plant modification and development, phase 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Progression on the design and development of a 40 KW fuel cell system for on-site installation for providing both thermal and electrical power is reported. Development of the steam reformer fuel processor, power section, inverter, control system, and thermal management and water treatment systems is described.

  6. Medicina array demonstrator: calibration and radiation pattern characterization using a UAV-mounted radio-frequency source

    NASA Astrophysics Data System (ADS)

    Pupillo, G.; Naldi, G.; Bianchi, G.; Mattana, A.; Monari, J.; Perini, F.; Poloni, M.; Schiaffino, M.; Bolli, P.; Lingua, A.; Aicardi, I.; Bendea, H.; Maschio, P.; Piras, M.; Virone, G.; Paonessa, F.; Farooqui, Z.; Tibaldi, A.; Addamo, G.; Peverini, O. A.; Tascone, R.; Wijnholds, S. J.

    2015-06-01

    One of the most challenging aspects of the new-generation Low-Frequency Aperture Array (LFAA) radio telescopes is instrument calibration. The operational LOw-Frequency ARray (LOFAR) instrument and the future LFAA element of the Square Kilometre Array (SKA) require advanced calibration techniques to reach the expected outstanding performance. In this framework, a small array, called Medicina Array Demonstrator (MAD), has been designed and installed in Italy to provide a test bench for antenna characterization and calibration techniques based on a flying artificial test source. A radio-frequency tone is transmitted through a dipole antenna mounted on a micro Unmanned Aerial Vehicle (UAV) (hexacopter) and received by each element of the array. A modern digital FPGA-based back-end is responsible for both data-acquisition and data-reduction. A simple amplitude and phase equalization algorithm is exploited for array calibration owing to the high stability and accuracy of the developed artificial test source. Both the measured embedded element patterns and calibrated array patterns are found to be in good agreement with the simulated data. The successful measurement campaign has demonstrated that a UAV-mounted test source provides a means to accurately validate and calibrate the full-polarized response of an antenna/array in operating conditions, including consequently effects like mutual coupling between the array elements and contribution of the environment to the antenna patterns. A similar system can therefore find a future application in the SKA-LFAA context.

  7. Nacelle Aerodynamic and Inertial Loads (NAIL) project

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A flight test survey of pressures measured on wing, pylon, and nacelle surfaces and of the operating loads on Boeing 747/Pratt & Whitney JT9D-7A nacelles was made to provide information on airflow patterns surrounding the propulsion system installations and to clarify processes responsible for inservice deterioration of fuel economy. Airloads at takeoff rotation were found to be larger than at any other normal service condition because of the combined effects of high angle of attack and high engine airflow. Inertial loads were smaller than previous estimates indicated. A procedure is given for estimating inlet airloads at low speeds and high angles of attack for any underwing high bypass ratio turbofan installation approximately resembling the one tested. Flight procedure modifications are suggested that may result in better fuel economy retention in service. Pressures were recorded on the core cowls and pylons of both engine installations and on adjacent wing surfaces for use in development of computer codes for analysis of installed propulsion system aerodynamic drag interference effects.

  8. 75 FR 81313 - Petitions for Modification of Existing Mandatory Safety Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... for methane, oxygen, and carbon monoxide concentrations using an approved hand-held device; (iv) measure air quantity using an appropriately calibrated anemometer. Methane gas or other harmful, noxious... percent methane above the previous reading or a 10 percent unplanned change in the airflow quantity from...

  9. 75 FR 41529 - Petitions for Modification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... number'' on the subject line, by any of the following methods: 1. Electronic Mail: Standards-Petitions... permissible pump trailing cables will not be smaller than 10 American Wire Gauge (AWG); (4) all circuit... will have an instantaneous trip unit calibrated to trip at 70 percent of phase-to-phase short-circuit...

  10. 75 FR 12793 - Petitions for Modification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ... number'' on the subject line, by any of the following methods: 1. Electronic Mail: Standards-Petitions... cables will be no smaller than 10 American Wire Gauge (AWG); (4) all circuit breakers used to protect... unit calibrated to trip at 70% of phase to phase short circuit current. The trip setting of these...

  11. Calibration of the SNO+ experiment

    NASA Astrophysics Data System (ADS)

    Maneira, J.; Falk, E.; Leming, E.; Peeters, S.; SNO+ Collaboration.

    2017-09-01

    The main goal of the SNO+ experiment is to perform a low-background and high-isotope-mass search for neutrinoless double-beta decay, employing 780 tonnes of liquid scintillator loaded with tellurium, in its initial phase at 0.5% by mass for a total mass of 1330 kg of 130Te. The SNO+ physics program includes also measurements of geo- and reactor neutrinos, supernova and solar neutrinos. Calibrations are an essential component of the SNO+ data-taking and analysis plan. The achievement of the physics goals requires both an extensive and regular calibration. This serves several goals: the measurement of several detector parameters, the validation of the simulation model and the constraint of systematic uncertainties on the reconstruction and particle identification algorithms. SNO+ faces stringent radiopurity requirements which, in turn, largely determine the materials selection, sealing and overall design of both the sources and deployment systems. In fact, to avoid frequent access to the inner volume of the detector, several permanent optical calibration systems have been developed and installed outside that volume. At the same time, the calibration source internal deployment system was re-designed as a fully sealed system, with more stringent material selection, but following the same working principle as the system used in SNO. This poster described the overall SNO+ calibration strategy, discussed the several new and innovative sources, both optical and radioactive, and covered the developments on source deployment systems.

  12. SeaWiFS Postlaunch Calibration and Validation Analyses

    NASA Technical Reports Server (NTRS)

    Hooker, Stanford B. (Editor); Firestone, Elaine R. (Editor); McClain, Charles R.; Ainsworth, Ewa J.; Barnes, Robert A.; Eplee, Robert E., Jr.; Patt, Frederick S.; Robinson, Wayne D.; Wang, Menghua; Bailey, Sean W.

    2000-01-01

    The effort to resolve data quality issues and improve on the initial data evaluation methodologies of the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) Project was an extensive one. These evaluations have resulted, to date, in three major reprocessings of the entire data set where each reprocessing addressed the data quality issues that could be identified up to the time of each reprocessing. The number of chapters (21) needed to document this extensive work in the SeaWiFS Postlaunch Technical Report Series requires three volumes. The chapters in Volumes 9, 10, and 11 are in a logical order sequencing through sensor calibration, atmospheric correction, masks and flags, product evaluations, and bio-optical algorithms. The first chapter of Volume 9 is an overview of the calibration and validation program, including a table of activities from the inception of the SeaWiFS Project. Chapter 2 describes the fine adjustments of sensor detector knee radiances, i.e., radiance levels where three of the four detectors in each SeaWiFS band saturate. Chapters 3 and 4 describe the analyses of the lunar and solar calibration time series, respectively, which are used to track the temporal changes in radiometric sensitivity in each band. Chapter 5 outlines the procedure used to adjust band 7 relative to band 8 to derive reasonable aerosol radiances in band 7 as compared to those in band 8 in the vicinity of Lanai, Hawaii, the vicarious calibration site. Chapter 6 presents the procedure used to estimate the vicarious calibration gain adjustment factors for bands 1-6 using the waterleaving radiances from the Marine Optical Buoy (MOBY) offshore of Lanai. Chapter 7 provides the adjustments to the coccolithophore flag algorithm which were required for improved performance over the prelaunch version. Chapter 8 is an overview of the numerous modifications to the atmospheric correction algorithm that have been implemented. Chapter 9 describes the methodology used to remove artifacts of sun glint contamination for portions of the imagery outside the sun glint mask. Finally, Chapter 10 explains a modification to the ozone interpolation method to account for actual time differences between the SeaWiFS and Total Ozone Mapping Spectrometer (TOMS) orbits.

  13. Intelligent irrigation performance: evaluation and quantifying its ability for conserving water in arid region

    NASA Astrophysics Data System (ADS)

    Al-Ghobari, Hussein M.; Mohammad, Fawzi S.

    2011-12-01

    Intelligent irrigation technologies have been developed in recent years to apply irrigation to turf and landscape plants. These technologies are an evapotranspiration (ET)-based irrigation controller, which calculates ET for local microclimate. Then, the controller creates a program for loading and communicating automatically with drip or sprinkler system controllers. The main objective of this study was to evaluate the effectiveness of the new ET sensors in ability to irrigate agricultural crops and to conserve water use for crop in arid climatic conditions. This paper presents the case for water conservation using intelligent irrigation system (IIS) application technology. The IIS for automating irrigation scheduling was implemented and tested with sprinkle and drip irrigation systems to irrigate wheat and tomato crops. Another irrigation scheduling system was also installed and operated as another treatment, which is based on weather data that retrieved from an automatic weather station. This irrigation control system was running in parallel to the former system (IIS) to be control experiments for comparison purposes. However, this article discusses the implementation of IIS, its installation, testing and calibration of various components. The experiments conducted for one growing season 2009-2010 and the results were represented and discussed herein. Data from all plots were analyzed, which were including soil water status, water consumption, and crop yield. The initial results indicate that up to 25% water saving by intelligent irrigation compared to control method, while maintaining competing yield. Results show that the crop evapotranspiration values for control experiments were higher than that of ET-System in consistent trend during whole growth season. The analysis points out that the values of the two treatments were somewhat close to each other's only in the initial development stages. Generally, the ET-System, with some modification was precise in controlling irrigation water and has been proven to be a good mean to determine the water requirements for crops and to schedule irrigation automatically.

  14. Improving LADCP Velocity Profiles with External Attitude Sensors

    NASA Astrophysics Data System (ADS)

    Thurnherr, A. M.; Goszczko, I.

    2016-12-01

    Data collected with Acoustic Doppler Current Profilers installed on CTD rosettes and lowered through the water column (LADCP systems) are routinely used to derive full-depth profiles of ocean velocity. In addition to the uncertainties arising from random noise in the along-beam velocity measurements, LADCP derived velocities are commonly contaminated by bias errors due to imperfectly measured instrument attitude (pitch, roll and heading). Of particular concern are the heading measurements because it is not usually feasible to calibrate the internal ADCP compasses with the instruments installed on a CTD rosette, away from the magnetic disturbances of the ship as well as the current-carrying winch wire. Heading data from dual-headed LADCP systems, which consist of upward and downward-pointing ADCPs installed on the same rosette, commonly indicate heading-dependent compass errors with amplitudes exceeding 10 degrees. In an attempt to reduce LADCP velocity errors, over 200 full-depth profiles were collected during several recent projects, including GO-SHIP, DIMES and ECOGIG, with an inexpensive (<$200) external magnetometer/accelerometer package. The resulting data permit full compass calibrations (for both hard- and soft-iron effects) from in-situ profile data and yields improved pitch and roll measurements. Results indicate greatly reduced inconsistencies between the data from the two ADCPs (horizontal-velocity processing residuals), as well as smaller biases in vertical -velocity (w) measurements. In addition, the external magnetometer package allows processing of some LADCP data collected in regions where the horizontal magnitude of the earth's magnetic field is insufficient for the ADCPs internal compasses to work at all.

  15. Performance evaluation of radiant cooling system integrated with air system under different operational strategies

    DOE PAGES

    Khan, Yasin; Khare, Vaibhav Rai; Mathur, Jyotirmay; ...

    2015-03-26

    The paper describes a parametric study developed to estimate the energy savings potential of a radiant cooling system installed in a commercial building in India. The study is based on numerical modeling of a radiant cooling system installed in an Information Technology (IT) office building sited in the composite climate of Hyderabad. To evaluate thermal performance and energy consumption, simulations were carried out using the ANSYS FLUENT and EnergyPlus softwares, respectively. The building model was calibrated using the measured data for the installed radiant system. Then this calibrated model was used to simulate the energy consumption of a building usingmore » a conventional all-air system to determine the proportional energy savings. For proper handling of the latent load, a dedicated outside air system (DOAS) was used as an alternative to Fan Coil Unit (FCU). A comparison of energy consumption calculated that the radiant system was 17.5 % more efficient than a conventional all-air system and that a 30% savings was achieved by using a DOAS system compared with a conventional system. Computational Fluid Dynamics (CFD) simulation was performed to evaluate indoor air quality and thermal comfort. It was found that a radiant system offers more uniform temperatures, as well as a better mean air temperature range, than a conventional system. To further enhance the energy savings in the radiant system, different operational strategies were analyzed based on thermal analysis using EnergyPlus. Lastly, the energy savings achieved in this parametric run were more than 10% compared with a conventional all-air system.« less

  16. Assessment of soil moisture dynamics on an irrigated maize field using cosmic ray neutron sensing

    NASA Astrophysics Data System (ADS)

    Scheiffele, Lena Maria; Baroni, Gabriele; Oswald, Sascha E.

    2015-04-01

    In recent years cosmic ray neutron sensing (CRS) developed as a valuable, indirect and non-invasive method to estimate soil moisture at a scale of tens of hectares, covering the gap between point scale measurements and large scale remote sensing techniques. The method is particularly promising in cropped and irrigated fields where invasive installation of belowground measurement devices could conflict with the agricultural management. However, CRS is affected by all hydrogen pools in the measurement footprint and a fast growing biomass provides some challenges for the interpretation of the signal and application of the method for detecting soil moisture. For this aim, in this study a cosmic ray probe was installed on a field near Braunschweig (Germany) during one maize growing season (2014). The field was irrigated in stripes of 50 m width using sprinkler devices for a total of seven events. Three soil sampling campaigns were conducted throughout the growing season to assess the effect of different hydrogen pools on calibration results. Additionally, leaf area index and biomass measurements were collected to provide the relative contribution of the biomass on the CRS signal. Calibration results obtained with the different soil sampling campaigns showed some discrepancy well correlated with the biomass growth. However, after the calibration function was adjusted to account also for lattice water and soil organic carbon, thus representing an equivalent water content of the soil, the differences decreased. Soil moisture estimated with CRS responded well to precipitation and irrigation events, confirming also the effective footprint of the method (i.e., radius 300 m) and showing occurring water stress for the crop. Thus, the dynamics are in agreement with the soil moisture determined with point scale measurements but they are less affected by the heterogeneous moisture conditions within the field. For this reason, by applying a detailed calibration, CRS proves to be a valuable method for the application on agricultural sites to assess and improve irrigation management.

  17. Revalidation of the NASA Ames 11-by 11-Foot Transonic Wind Tunnel with a Commercial Airplane Model

    NASA Technical Reports Server (NTRS)

    Kmak, Frank J.; Hudgins, M.; Hergert, D.; George, Michael W. (Technical Monitor)

    2001-01-01

    The 11-By 11-Foot Transonic leg of the Unitary Plan Wind Tunnel (UPWT) was modernized to improve tunnel performance, capability, productivity, and reliability. Wind tunnel tests to demonstrate the readiness of the tunnel for a return to production operations included an Integrated Systems Test (IST), calibration tests, and airplane validation tests. One of the two validation tests was a 0.037-scale Boeing 777 model that was previously tested in the 11-By 11-Foot tunnel in 1991. The objective of the validation tests was to compare pre-modernization and post-modernization results from the same airplane model in order to substantiate the operational readiness of the facility. Evaluation of within-test, test-to-test, and tunnel-to-tunnel data repeatability were made to study the effects of the tunnel modifications. Tunnel productivity was also evaluated to determine the readiness of the facility for production operations. The operation of the facility, including model installation, tunnel operations, and the performance of tunnel systems, was observed and facility deficiency findings generated. The data repeatability studies and tunnel-to-tunnel comparisons demonstrated outstanding data repeatability and a high overall level of data quality. Despite some operational and facility problems, the validation test was successful in demonstrating the readiness of the facility to perform production airplane wind tunnel%, tests.

  18. Synthesis and Late-Stage Functionalization of Complex Molecules through C–H Fluorination and Nucleophilic Aromatic Substitution

    PubMed Central

    2015-01-01

    We report the late-stage functionalization of multisubstituted pyridines and diazines at the position α to nitrogen. By this process, a series of functional groups and substituents bound to the ring through nitrogen, oxygen, sulfur, or carbon are installed. This functionalization is accomplished by a combination of fluorination and nucleophilic aromatic substitution of the installed fluoride. A diverse array of functionalities can be installed because of the mild reaction conditions revealed for nucleophilic aromatic substitutions (SNAr) of the 2-fluoroheteroarenes. An evaluation of the rates for substitution versus the rates for competitive processes provides a framework for planning this functionalization sequence. This process is illustrated by the modification of a series of medicinally important compounds, as well as the increase in efficiency of synthesis of several existing pharmaceuticals. PMID:24918484

  19. KSC-98pc1165

    NASA Image and Video Library

    1998-09-28

    The orbiter Atlantis, being towed from the Shuttle Landing Facility, is reflected in waters from the Banana Creek next to the towway. The orbiter spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  20. Laser hardening techniques on steam turbine blade and application

    NASA Astrophysics Data System (ADS)

    Yao, Jianhua; Zhang, Qunli; Kong, Fanzhi; Ding, Qingming

    Different laser surface hardening techniques, such as laser alloying and laser solution strengthening were adopted to perform modification treatment on the local region of inset edge for 2Cr13 and 17-4PH steam turbine blades to prolong the life of the blades. The microstructures, microhardness and anti-cavitation properties were investigated on the blades after laser treatment. The hardening mechanism and technique adaptability were researched. Large scale installation practices confirmed that the laser surface modification techniques are safe and reliable, which can improve the properties of blades greatly with advantages of high automation, high quality, little distortion and simple procedure.

Top