Sample records for modules annual subcontract

  1. NREL Photovoltaic Program FY 1995 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report summarizes the in-house and subcontracted R&D activities from Oct. 1994 through Sept. 1995; their objectives are to conduct basic, applied, and engineering research, manage subcontracted R&D projects, perform research complementary to subcontracted work, develop and maintain state-of-the-art measurement and device capabilities, develop PV manufacturing technology and modules, transfer results to industry, and evolve viable partnerships for PV systems and market development. The research activities are grouped into 5 sections: crystalline Si and advanced devices, thin-film PV, PV manufacturing, PV module and system performance and engineering, and PV applications and market development.

  2. High-throughput manufacturing of thin-film CdS/CdTe photovoltaic modules. Annual subcontract report, 16 November 1994--15 November 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D.W.

    1997-02-01

    The objectives of this subcontract are to advance Solar Cells, Inc.`s (SCI`s) photovoltaic manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. Activities during the second year of the program concentrated on process development, equipment design and testing, quality assurance, and ES and H programs. These efforts broadly addressed the issues of the manufacturing process for producing thin-film monolithic CdS/CdTe photovoltaic modules.

  3. High throughput manufacturing of thin-film CdTe photovoltaic modules. Annual subcontract report, 16 November 1993--15 November 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D W

    1995-11-01

    This report describes work performed by Solar Cells, Inc. (SCI), under a 3-year subcontract to advance SCI`s PV manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. SCI will meet these objectives in three phases by designing, debugging, and operating a 20-MW/year, automated, continuous PV manufacturing line that produces 60-cm {times} 120-cm thin-film CdTe PV modules. This report describes tasks completed under Phase 1 of the US Department of Energy`s PV Manufacturing Technology program.

  4. Photovoltaic Subcontract Program. Annual report, FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  5. Final Report for PV Incubator Subcontract No. NAT-0-99013-01: June 14, 2010 - March 2, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghosal, K.

    2012-04-01

    The goal of the subcontract is to scale up Semprius' novel micro-cell based modules to an annualized rate of 500 kW of receivers and 10 kW of modules, in support of the DOE 2020 Sunshot Initiative goals. The statement of work (SOW) was broken up into two Phases. Phase I was directed towards process development efforts towards addressing fundamental manufacturing metrics such as yield, die per wafer, automation and throughput. Phase II objectives are to scale to an annualized production rate of 500 kW of receivers and 10 kW of modules, while improving cell efficiency, module efficiency and transfer yield.more » Semprius has met all the technical milestones and deliverables for the contract. All subtasks were completed earlier than expected and the results exceeded the technical targets. In particular, 3J cell efficiency of 41.2% exceeded the target of 38%, module efficiency of 28.3% exceeded the target of 28% and transfer yield of 96.4% exceeds the target of 95%, with all tasks completed well ahead of schedule. Also, devices fabricated from 1st use GaAs substrates and substrates with two re-uses have been shown to be identical.« less

  6. Large-area triple-junction a-Si alloy production scaleup. Annual subcontract report, 17 March 1993--18 March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oswald, R.; Morris, J.

    1994-11-01

    The objective of this subcontract over its three-year duration is to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance and expand the Solarex commercial production capacity. Solarex shall meet these objectives by improving the deposition and quality of the transparent front contact, by optimizing the laser patterning process, scaling-up the semiconductor deposition process, improving the back contact deposition, scaling-up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 2 portion of this subcontract, Solarex focused on improving deposition of the front contact, investigating alternate feed stocks for the front contact,more » maximizing throughput and area utilization for all laser scribes, optimizing a-Si:H deposition equipment to achieve uniform deposition over large-areas, optimizing the triple-junction module fabrication process, evaluating the materials to deposit the rear contact, and optimizing the combination of isolation scribe and encapsulant to pass the wet high potential test. Progress is reported on the following: Front contact development; Laser scribe process development; Amorphous silicon based semiconductor deposition; Rear contact deposition process; Frit/bus/wire/frame; Materials handling; and Environmental test, yield and performance analysis.« less

  7. Annual Report: Photovoltaic Subcontract Program FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Summers, K. A.

    1991-03-01

    This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less

  8. NREL Photovoltaic Program. FY 1994 annual report, October 1, 1993--September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-01

    This report summarizes the in-house and subcontracted research and development activities under the National renewable Energy Laboratory (NREL) Photovoltaics (PV) program for fiscal year 1994. Research is organized under the following areas; PV program management; crystalline silicon and advanced devices; thin-film PV technologies; PV manufacturing; PV module and system performance and engineering; and PV applications and markets.

  9. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  10. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  11. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  12. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  13. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  14. Low-cost manufacturing of the point focus concentrating module and its key component, the Fresnel lens. Final subcontract report, 31 January 1991--6 May 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saifee, T.; Konnerth, A. III

    1991-11-01

    Solar Kinetics, Inc. (SKI) has been developing point-focus concentrating PV modules since 1986. SKI is currently in position to manufacture between 200 to 600 kilowatts annually of the current design by a combination of manual and semi-automated methods. This report reviews the current status of module manufacture and specifies the required approach to achieve a high-volume manufacturing capability and low cost. The approach taken will include process development concurrent with module design for automated manufacturing. The current effort reviews the major manufacturing costs and identifies components and processes whose improvements would produce the greatest effect on manufacturability and cost reduction.more » The Fresnel lens is one such key component. Investigating specific alternative manufacturing methods and sources has substantially reduced the lens costs and has exceeded the DOE cost-reduction goals. 15 refs.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holley, W A

    This report describes work performed under a subcontract to the National Renewable Energy Laboratory under the Photovoltaic Manufacturing Technology Project. The objectives of this subcontract are to (1) define the problem of yellowing/browning of EVA-based encapsulants; (2) determine probable mechanisms and the role of various parameters such as heat, UV exposure, module construction, EVA interfaces, and EVA thickness, in the browning of EVA-based encapsulants; (3) develop stabilization strategies for various module constructions to protect the encapsulant from degradative failure; (4) conduct laboratory, accelerated outdoor, and field testing of encapsulant, laminated test coupons, and full modules to demonstrate the functional adequacymore » of the stabilization strategies; and (5) implement these strategies. This report summarizes the accomplishments related to the above goals for the reporting period.« less

  16. The Photovolatic Manufacturing Technology project (PVMaT) after three years

    NASA Astrophysics Data System (ADS)

    Witt, C. Edwin; Mitchell, Richard L.; Thomas, Holly; Herwig, Lloyd O.

    1994-08-01

    The Photovoltaic Manufacturing Technology project (PVMaT) is a government/industry research and development (R&D) partnership involving joint efforts between the federal government (through the US Department of Energy (DOE)) and members of the US photovoltaic (PV) industry. The project's goal is to assist US industry in retaining and extending its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is being carried out in three separate phases, each designed to address separate R&D requirements for achieving PVMaT goals. Phase 1 was a problem identification phase of about 3 months duration. In Phase 1, the status and needs of the US PV manufacturing industry were identified, and the development of a Phase 2 procurement responsive to the industry's needs was begun. Phase 1 was completed in 1991. Problem solution began in 1992, under Phase 2A, when DOE awarded multiyear subcontracts. Technical accomplishments for PVMaT 2A are presented in this paper. Subcontracts were recently awarded for a second, overlapping, and similar process-specific solicitation (PVMaT 2B). The activities of these new subcontracts are also described. Two subcontracts presently comprise the Phase 3 effort. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. A teamed research approach is being used to improve automated module manufacturing lines and encapsulation materials used in module manufacturing. The first year's work on these subcontracts is also described in this paper.

  17. Photovoltaic Subcontract Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surek, Thomas; Catalano, Anthony

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  18. NREL photovoltaic program FY 1997 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less

  19. High Throughput Manufacturing of Thin-Film CdTe Photovoltaic Materials; Final Subcontract Report, 16 November 1993-31 December 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D. W.

    1999-09-02

    This report describes work performed by Solar Cells, Inc. (SCI), during this Photovoltaic Manufacturing Technology (PVMaT) subcontract. Cadmium telluride (CdTe) is recognized as one of the leading materials for low-cost photovoltaic modules. SCI has developed this technology and is preparing to scale its pilot production capabilities to a multi-megawatt level. This four-phase PVMaT subcontract supports these efforts. The work was related to product definition, process definition, equipment engineering, and support programs development. In the area of product definition and demonstration, two products were specified and demonstrated-a grid-connected, frameless, high-voltage product that incorporates a pigtail potting design and a remote low-voltagemore » product that may be framed and may incorporate a junction box. SCI produced a 60.3-W thin-film CdTe module with total-area efficiency of 8.4%; SCI also improved module pass rate on the interim qualification test protocol from less than 20% to 100% as a result of work related to the subcontract. In the manufacturing process definition area, the multi-megawatt manufacturing process was defined, several of the key processes were demonstrated, and the process was refined and proven on a 100-kW pilot line that now operates as a 250-kW line. In the area of multi-megawatt manufacturing-line conceptual design review, SCI completed a conceptual layout of the multi-megawatt lines. The layout models the manufacturing line and predicts manufacturing costs. SCI projected an optimized capacity, two-shift/day operation of greater than 25 MW at a manufacturing cost of below $1.00/W.« less

  20. SIG Galileo final converter technical summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinderman, J.D.

    1979-05-01

    The report is primarily concerned with the work performed for DOE on converter development and fabrication for the NASA Galileo Jupiter mission as a DOE prime contractor with interface primarily with Teledyne Energy Systems. The activities reported on were directed toward design, analysis and testing of modules and converters SN-1 thru SN-7 and attendant Quality Control and Reliability effort. Although assembly and testing of SN-1 was not accomplished due to the stop work order, the design was virtually completed and a significant amount of subcontracting and manufacturing of both module and converter components was underway. These subcontracting and manufacturing activitiesmore » were selectively closed down depending upon degree of completion and material or hardware potential usage in the Technology Program.« less

  1. A case study of cost-efficient staffing under annualized hours.

    PubMed

    van der Veen, Egbert; Hans, Erwin W; Veltman, Bart; Berrevoets, Leo M; Berden, Hubert J J M

    2015-09-01

    We propose a mathematical programming formulation that incorporates annualized hours and shows to be very flexible with regard to modeling various contract types. The objective of our model is to minimize salary cost, thereby covering workforce demand, and using annualized hours. Our model is able to address various business questions regarding tactical workforce planning problems, e.g., with regard to annualized hours, subcontracting, and vacation planning. In a case study for a Dutch hospital two of these business questions are addressed, and we demonstrate that applying annualized hours potentially saves up to 5.2% in personnel wages annually.

  2. An Industrial-Based Consortium to Develop Premium Carbon Products from Coal, Annual Progress Report, October 1, 2005 through September 30, 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Bruce G

    2006-09-29

    Since 1998, The Pennsylvania State University has been successfully managing the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by Penn State, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350.more » This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes Penn State and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. Base funding for the selected projects is provided by NETL with matching funds from industry. At the annual funding meeting held in October 2003, ten projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten 2004 projects were completed during the previous annual reporting period and their final reports were submitted with the previous annual report (i.e., 10/01/04-09/30/05). The final report for the remaining project, which was submitted during this reporting period (i.e., 10/01/05-09/30/06), is attached. At the annual funding meeting held in November 2004, eleven projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2005. Three additional projects were selected for funding during the April 2005 tutorial/funding meeting. Subcontracts were let from Penn State to the subcontractors on July 1, 2005. Of these fourteen 2005 projects, eleven have been completed and the final reports are attached. An annual funding meeting was held in November 2005 and the council selected five projects for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2006, except for one that started October 1, 2006.« less

  3. Development of a Novel Alginate-Based Pleural Sealant

    DTIC Science & Technology

    2016-07-01

    CONTRACTING ORGANIZATION: University of Vermont and State Agriculture College Burlington, VT 05405 REPORT DATE: July 2016 TYPE OF REPORT: Annual...University of Vermont and State Agricultural College Subcontract to Akina Inc. AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Burlington

  4. Optimization of Processing and Modeling Issues for Thin Film Solar Cell Devices Including Concepts for The Development of Polycrystalline Multijunctions: Annual Report; 24 August 1998-23 August 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birkmire, R.W.; Phillips, J.E.; Shafarman, W.N.

    2000-08-25

    This report describes results achieved during phase 1 of a three-phase subcontract to develop and understand thin-film solar cell technology associated to CuInSe{sub 2} and related alloys, a-Si and its alloys, and CdTe. Modules based on all these thin films are promising candidates to meet DOE long-range efficiency, reliability, and manufacturing cost goals. The critical issues being addressed under this program are intended to provide the science and engineering basis for the development of viable commercial processes and to improve module performance. The generic research issues addressed are: (1) quantitative analysis of processing steps to provide information for efficient commercial-scalemore » equipment design and operation; (2) device characterization relating the device performance to materials properties and process conditions; (3) development of alloy materials with different bandgaps to allow improved device structures for stability and compatibility with module design; (4) development of improved window/heterojunction layers and contacts to improve device performance and reliability; and (5) evaluation of cell stability with respect to illumination, temperature, and ambient and with respect to device structure and module encapsulation.« less

  5. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  6. Compilation of 1986 Annual Reports of the Navy ELF (Extremely Low Frequency) Communications System Ecological Monitoring Program. Volume 2. TABS D-G.

    DTIC Science & Technology

    1987-07-01

    8217. -. , i U ELF ECOLOGICAL MONITORING PROGRAM INDEX OF 1986 ANNUAL REPORTS A. Herbaceous Plant Cover and Tree Studies \\ Michigan Technological University...SUBCONTRACT NUMBER EO 6549-84-C-005 LELF Communications System Ecological Monitoring Program BIOLOGICAL STUDIES ON POLLINATING INSECTS: MEGACHILID...such as those in the vicinity of the ELF antenna because they are pollinators of flowering plants , and are therefore important to the reproductive

  7. SPEEDIER Project. Third Annual Report, 1969-70.

    ERIC Educational Resources Information Center

    Curriculum Study Research and Development Council of South Central Pennsylvania, Palmyra.

    This project was funded under ESEA Title III and four subcontracts with Research for Better Schools. The Title III aspect of the project focused on curriculum change in the fields of language arts, social sciences, and teacher training. Complete reports on each of the following have been included: 1) the Social Studies Pilot Programs as described…

  8. 25 CFR 1000.277 - To what extent shall the Tribe/Consortium cooperate with the Federal government in connection...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Federal Tort Claims § 1000.277 To what extent shall the Tribe... employees that relates to performance of a self-governance AFA or subcontract. (c) The Tribe/Consortium...

  9. 25 CFR 1000.277 - To what extent shall the Tribe/Consortium cooperate with the Federal government in connection...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Federal Tort Claims § 1000.277 To what extent shall the Tribe... employees that relates to performance of a self-governance AFA or subcontract. (c) The Tribe/Consortium...

  10. 25 CFR 1000.277 - To what extent shall the Tribe/Consortium cooperate with the Federal government in connection...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Federal Tort Claims § 1000.277 To what extent shall the Tribe... employees that relates to performance of a self-governance AFA or subcontract. (c) The Tribe/Consortium...

  11. 25 CFR 1000.277 - To what extent shall the Tribe/Consortium cooperate with the Federal government in connection...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Federal Tort Claims § 1000.277 To what extent shall the Tribe... employees that relates to performance of a self-governance AFA or subcontract. (c) The Tribe/Consortium...

  12. Two cases of methyl alcohol intoxication by sub-chronic inhalation and dermal exposure during aluminum CNC cutting in a small-sized subcontracted factory.

    PubMed

    Ryu, Jia; Lim, Key Hwan; Ryu, Dong-Ryeol; Lee, Hyang Woon; Yun, Ji Young; Kim, Seoung-Wook; Kim, Ji-Hoon; Jung-Choi, Kyunghee; Kim, Hyunjoo

    2016-01-01

    Methyl alcohol poisoning has been mainly reported in community. Two cases of methyl alcohol poisoning occurred in a small-sized subcontracted factory which manufactured smartphone parts in Korea. One young female patient presented with dyspnea and visual disturbance. Another young male patient presented with visual disturbance and myalgia. They treated with sodium bicarbonate infusion and hemodialysis for metabolic acidosis. In addition, he received ethyl alcohol per oral treatment. Her and his urinary methyl alcohol concentration was detected as 7.632 mg/L, 46.8 mg/L, respectively, although they were treated hemodialysis. Results of the working environment measurement showed that the concentration of methyl alcohol (1030.1-2220.5 ppm) in the air exceeded the time weighted average (200 ppm). They were diagnosed with optic neuropathy due to methyl alcohol poisoning and still have visual impairment. Workers who hired as dispatched employees in a small-sized subcontracted factory were exposed to high concentrations of methyl alcohol. The workplace had poor ventilation system. In addition, workers did not wear proper personal protect equipment. Working environment measurement and annual chekups for workers were not performed. They were in a blind spot to occupational safety and health. More attention is needed to protect vulnerable workers' health.

  13. Apollo(R) Thin Film Process Development: Final Technical Report, April 1998 - April 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, D.W.

    2002-10-01

    BP Solar first started investigative work on CdTe photovoltaics in 1986. The module product name chosen for the CdTe devices is Apollo. The deposition method chosen was electrochemical deposition due to its simplicity and good control of stoichiometric composition. The window layer used is CdS, produced from a chemical-bath deposition. Initial work focused on increasing photovoltaic cell size from a few mm2 to 900 cm2. At BP Solar's Fairfield plant, work is focused on increasing semiconductor deposition to 1 m2. The primary objective of this subcontract is to establish the conditions required for the efficient plating of CdS/CdTe on large-area,more » transparent conducting tin-oxide-coated glass superstrate. The initial phase concentrates on superstrate sizes up to 0.55 m2. Later phases will include work on 0.94 m2 superstrates. The tasks in this subcontract have been split into four main categories: (1) CdS and CdTe film studies; (2) Enhanced laser processing; (3) Outdoor testing program for the Apollo module; and (4) Production waste abatement and closed loop study.« less

  14. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  15. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  16. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  17. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  18. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  19. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND... notify the Contracting officer in writing at least 30 days in advance of entering into any subcontract or...

  20. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracts and work... Subcontracts and work coordination. The contracting officer shall insert the clause at 852.236-80, Subcontracts and work coordination, in solicitations and contracts for construction expected to exceed the micro...

  1. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  2. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  3. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  4. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  5. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  6. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  7. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  8. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  9. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  10. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  11. 48 CFR 1052.219-71 - Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...

  12. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  13. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services. >

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Subcontracting for nuclear... Clauses 952.225-70 Subcontracting for nuclear hot cell services.> As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  14. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  15. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  16. Improvements in Cz silicon PV module manufacturing

    NASA Astrophysics Data System (ADS)

    King, Richard R.; Mitchell, Kim W.; Jester, Theresa L.

    1997-02-01

    Work focused on reducing the cost per watt of Cz Si photovoltaic modules under Phase I of Siemens Solar Industries' DOE/NREL PVMaT 4A subcontract is described. Module cost components are analyzed and solutions to high-cost items are discussed in terms of specific module designs. The approaches of using larger cells and modules to reduce per-part processing cost, and of minimizing yield loss are particularly leveraging. Yield components for various parts of the fabrication process and various types of defects are shown, and measurements of the force required to break wafers throughout the cell fabrication sequence are given. The most significant type of yield loss is mechanical breakage. The implementation of statistical process control on key manufacturing processes at Siemens Solar Industries is described. Module configurations prototyped during Phase I of this project and scheduled to begin production in Phase II have a projected cost per watt reduction of 19%.

  17. ARTIST CONCEPT - APOLLO XI - LUNAR SURFACE

    NASA Image and Video Library

    1969-07-11

    S69-39011 (July 1969) --- TRW Incorporated's artist concept depicting the Apollo 11 Lunar Module (LM) descending to the surface of the moon. Inside the LM will be astronauts Neil A. Armstrong, commander, and Edwin E. Aldrin Jr., lunar module pilot. Astronaut Michael Collins, command module pilot, will remain with the Command and Service Modules (CSM) in lunar orbit. TRW's LM descent engine will brake Apollo 11's descent to the lunar surface. The throttle-able rocket engine will be fired continuously the last 10 miles of the journey to the moon, slowing the LM to a speed of two miles per hour at touchdown. TRW Incorporated designed and built the unique engine at Redondo Beach, California under subcontract to the Grumman Aircraft Engineering Corporation, Bethpage, New York, the LM prime contractor.

  18. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  19. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  20. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  1. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  2. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  3. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  4. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  5. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  6. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  7. 48 CFR 2019.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705-4 Reviewing the subcontracting plan...

  8. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...

  9. Billie Christen | NREL

    Science.gov Websites

    , administration, and placement of subcontracts for both centers, ensuring that the objectives are met and that the develop budgets for subcontracts and makes sure the subcontracts are properly initiated and closed out in

  10. Advanced CIGS Photovoltaic Technology: Annual Technical Report--Phase II, 15 November 2002--14 November 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delahoy, A. E.; Chen, L.

    2004-05-01

    The objective of this subcontract is to develop and integrate the various pieces of new technology that EPV considers enabling for cost-effective production of CIGS modules. EPV has conducted research to help generate a technology base for production of CIGS PV modules using vacuum deposition of CIGS onto glass. This strategy is consistent with the observation that, despite there being several approaches to forming device-quality CIGS, vacuum deposition has maintained the world record for the highest-efficiency CIGS device. A record thin-film solar cell efficiency of 19.2% (with Ni-Al grid and MgF2 ARC) for a 0.41-cm2 device was achieved by NRELmore » in 2003 using vacuum-deposited CIGS. The deposition employed four point sources and detection of the Cu-poor to Cu-rich transition for process control. To extend this type of processing to the realm of large-area substrates, EPV developed vacuum equipment designed for heating and coating 0.43-m2 moving substrates, with a projected further scale up to 0.79 m2. The substrates are typically low-cost, soda-lime glass, and the materials are supplied to the moving substrates using novel linear-source technology developed by EPV. The use of elemental selenium rather than toxic H2Se gas helps make for a safe manufacturing environment. These choices concerning film deposition, substrates, and source materials help to minimize the processing costs of CIGS.« less

  11. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  12. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  13. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  14. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  15. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontract administration. 30.607 Section 30.607 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract...

  16. Solar electric thermal hydronic (SETH) product development project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickney, B.L.; Sindelar, A.

    Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and developmentmore » of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.« less

  17. 48 CFR 219.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business firms specifically identified in the subcontracting plan. Notifications shall be in writing and... SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business... business concerns shall include subcontracts with historically black colleges and universities and minority...

  18. Office of Inspector General audit report on Fluor Daniel Fernald`s use of temporary services subcontractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-01

    The Department of Energy (Department) and Fluor Daniel Fernald (Fluor Daniel) implemented two work force restructurings at the Fernald Environmental Management Project between Fiscal Years (FY) 1994 and 1996. During the restructurings, the Department`s cost for temporary service subcontracts increased from $2.8 million to $9.8 million annually. The objective of this audit was to determine whether Fluor Daniel utilized temporary service agreements in an economical and efficient manner and in accordance with the policy and goals of the Department`s Work Force Restructuring Program.

  19. 77 FR 9658 - General Services Administration Acquisition Regulation; Information Collection; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  20. 78 FR 59798 - Small Business Subcontracting: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 125 RIN 3245-AG22 Small Business Subcontracting: Correction AGENCY: U.S. Small Business Administration. ACTION: Correcting amendments. SUMMARY: This document... business subcontracting to implement provisions of the Small Business Jobs Act of 2010. This correction...

  1. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  2. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  3. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  4. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  5. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  6. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  7. 48 CFR 49.108 - Settlement of subcontract settlement proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement of subcontract settlement proposals. 49.108 Section 49.108 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108 Settlement of subcontract...

  8. 48 CFR 1519.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...

  9. Department of Defense Companies Participating in the Department of Defense Subcontracting Program. First Three Quarters Fiscal Year 1990

    DTIC Science & Technology

    1990-01-01

    This report presents a variety of subcontract data collected from Department of Defense (DOD) large business firms that have received at least one...award in excess of $500,000 ($1,000,000 for construction). Public Law 95-507 requires that these contractors establish a small business and small...disadvantaged business subcontracting program and report to DOD quarterly, using Standard Form 295, on subcontract awards made to these types of firms

  10. 48 CFR 970.1907-1 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...

  11. 77 FR 31016 - General Services Administration Acquisition Regulation; Submission for OMB Review; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  12. 13 CFR 126.701 - Can these subcontracting percentages requirements change?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Can these subcontracting percentages requirements change? 126.701 Section 126.701 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.701 Can these subcontracting percentages...

  13. 48 CFR 49.606 - Granting subcontract settlement authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-furnished material or articles completed but undelivered under the subcontract or purchase order, as these... articles may be disposed of without Government approval or screening if the total amount (at subcontract... retention or other disposal of termination inventory allocated to the settlement proposal. (ii) Deduct...

  14. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  15. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  16. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  17. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  18. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  19. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.009 Subcontracting research and development effort. Since the selection of R&D contractors is substantially based on... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontracting research...

  20. 48 CFR 215.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontract pricing considerations. 215.404-3 Section 215.404-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contract Pricing 215.404-3 Subcontract pricing considerations. Follow the procedures at PGI 215.404-3 when...

  1. 76 FR 61626 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Parts 121 and 125 RIN 3245-AG22 Small Business Subcontracting AGENCY: U.S. Small Business Administration. ACTION: Proposed rule. SUMMARY: The U.S. Small Business... Business Jobs Act of 2010, which pertain to small business subcontracting. SBA is proposing to amend its...

  2. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  3. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  4. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  5. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  6. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  7. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  8. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  9. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  10. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  11. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  12. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  13. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  14. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  15. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  16. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  17. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  18. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  19. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  20. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  1. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  2. 48 CFR 31.204 - Application of principles and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-price subcontract with economic price adjustment provisions. (c) Costs incurred as payments under firm-fixed-price subcontracts or fixed-price subcontracts with economic price adjustment provisions or... captures the essential nature of, the cost at issue. [48 FR 42301, Sept. 19, 1983, as amended at 53 FR...

  3. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Small business... Clauses 52.219-9 Small business subcontracting plan. As prescribed in 19.708(b), insert the following clause: Small Business Subcontracting Plan (OCT 2010) (a) This clause does not apply to small business...

  4. 25 CFR 276.16 - Subgrants and subcontracts to non-profit organizations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Subgrants and subcontracts to non-profit organizations. 276.16 Section 276.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF... Subgrants and subcontracts to non-profit organizations. The uniform administrative requirements in this part...

  5. Companies Participating in the Department of Defense Subcontracting Program. First Quarter, Fiscal Year 1995.

    DTIC Science & Technology

    1995-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has a section for each of the...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and disadvantaged businesses. The

  6. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... hot cell services. 952.225-70 Section 952.225-70 Federal Acquisition Regulations System DEPARTMENT OF....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  7. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  8. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  9. 78 FR 17671 - Federal Acquisition Regulation; Submission for OMB Review; Summary Subcontract Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for... for DOD and NASA) of subcontracts awarded by prime and subcontractors for a specific Federal... data from Alaskan Native Corporations and Indian Tribe concerns under a subcontracting plan with the...

  10. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use...

  11. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  12. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  13. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  14. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  15. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  16. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  17. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  18. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  19. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    DTIC Science & Technology

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holley, W H

    This report describes the results of the literature search, interviews, and site visits conducted during the first six months of this subcontract. This survey was conducted to establish a baseline of information about thermal and photothermal degradation of EVA and case history surveys on discoloration (yellowing/browning) of EVA-based encapsulants in fielded flat-plate PV modules. The literature search revealed that EVA will undergo thermolysis of the acetate groups at temperatures of 130{degrees}C to 150{degrees}C and above, leading to formation of double bonds in the backbone of the copolymer. The survey of case histories of EVA-based encapsulant discoloration in fielded modules inmore » the United States revealed that the problem is limited to those areas of the west and southwest that have comparatively high solar insolation and ambient temperature. It is clear that the discoloration problem is not limited to the modules of any one manufacturer. Discoloration in the EVA encapsulant was experienced in fielded modules from all major US module producers.« less

  1. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  2. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  3. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  4. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  5. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  6. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  7. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  8. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  9. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  10. 48 CFR 212.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 212.504 Section 212.504 Federal... PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  11. Department of Defense Companies Participating in the Department of Defense Subcontracting Program, First Quarter Fiscal Year 1994

    DTIC Science & Technology

    1994-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has section for each of the Military...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and small disadvantaged businesses. The

  12. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  13. Processing of CuInSe{sub 2}-based solar cells: Characterization of deposition processes in terms of chemical reaction analyses. Phase 2 Annual Report, 6 May 1996--5 May 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, T.

    This report describes research performed by the University of Florida during Phase 2 of this subcontract. First, to study CIGS, researchers adapted a contactless, nondestructive technique previously developed for measuring photogenerated excess carrier lifetimes in SOI wafers. This dual-beam optical modulation (DBOM) technique was used to investigate the differences between three alternative methods of depositing CdS (conventional chemical-bath deposition [CBD], metal-organic chemical vapor deposition [MOCVD], and sputtering). Second, a critical assessment of the Cu-In-Se thermochemical and phase diagram data using standard CALPHAD procedures is being performed. The outcome of this research will produce useful information on equilibrium vapor compositions (requiredmore » annealing ambients, Sex fluxes from effusion cells), phase diagrams (conditions for melt-assisted growth), chemical potentials (driving forces for diffusion and chemical reactions), and consistent solution models (extents of solid solutions and extending phase diagrams). Third, an integrated facility to fabricate CIS PV devices was established that includes migration-enhanced epitaxy (MEE) for deposition of CIS, a rapid thermal processing furnace for absorber film formation, sputtering of ZnO, CBD or MOCVD of CdS, metallization, and pattern definition.« less

  14. 40 CFR 35.4240 - What provisions must my group's TAG contractor comply with if it subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false What provisions must my group's TAG contractor comply with if it subcontracts? 35.4240 Section 35.4240 Protection of Environment ENVIRONMENTAL... with if it subcontracts? A TAG contractor must comply with the following provisions when awarding...

  15. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  16. 22 CFR 228.37 - Nationality of employees under contracts or subcontracts for services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... subcontracts for services. 228.37 Section 228.37 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES ON SOURCE, ORIGIN AND NATIONALITY FOR COMMODITIES AND SERVICES FINANCED BY USAID Conditions Governing... contracts or subcontracts for services. (a) The rules set forth in §§ 228.31 through 228.36 do not apply to...

  17. 48 CFR 12.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 12.504 Section 12.504 Federal Acquisition... Applicability of Certain Laws to the Acquisition of Commercial Items and Commercially Available Off-The-Shelf Items 12.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  18. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  19. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  20. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  1. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  2. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  3. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  4. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  5. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  6. Minority On-Line Information Service (MOLIS): A minority research and education information service. Final report for Department of Energy Grant No. DE-FG02-90ER75602

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rodman, John A.

    MOLIS is an online database of minority institutions, and is used by federal agencies to identify peer reviewers and by majority institutions to identify possible collaborations and sub-contracts. MOLIS includes in-depth information about the research and educational capabilities of Historically Black Colleges and Universities (HBCUs), Hispanic Serving Institutions (HSIs), and Tribal Colleges. Included with this report are several annual progress reports, a list of all minority institutions currently on MOLIS, a list of outreach activities, etc.

  7. 2 CFR 801.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 801.220 Section 801.220 Grants and... DEBARMENT AND SUSPENSION Covered Transactions § 801.220 What contracts and subcontracts, in addition to...

  8. 42 CFR 434.6 - General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...

  9. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  10. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  11. Report on Contractual Flow Down Provisions in the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS)

    DTIC Science & Technology

    2017-11-01

    Richard Ginman, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts...publication, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts, http...FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts. Arlington, VA: National Defense Industrial Association NDIA), 2016. http

  12. Research on polycrystalline thin film submodules based on CuInSe{sub 2} materials. Annual subcontract report, 11 November 1990--31 October 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Catalano, A.; Arya, R.; Carr, L.

    1992-05-01

    This report describes progress during the first year of a three-year research program to develop 12%-efficient CuInSe{sub 2} (CIS) submodules with area greater than 900 cm{sup 2}. To meet this objective, the program was divided into five tasks: (1) windows, contacts, substrates; (2) absorber material; (3) device structure; (4) submodule design and encapsulation; and (5) process optimization. In the first year of the program, work was concentrated on the first three tasks with an objective to demonstrate a 9%-efficient CIS solar cell. 7 refs.

  13. Thin-film photovoltaic partnership -- Apollo{reg{underscore}sign} thin film process development: Phase 1 Technical Report, May 1998--April 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, D.W.; Skinner, D.E.

    1999-10-26

    The objective of this Phase 1 subcontract was to establish an efficient production plating system capable of depositing thin-film CdTe and CdS on substrates up to 0.55 m{sup 2}. This baseline would then be used to build on and extend deposition areas to 0.94 m{sup 2} in the next two phases. The following achievements have been demonstrated: {sm{underscore}bullet} Chemical-bath deposition of CdS and electrochemical deposition of CdTe was demonstrated on 0.55 m{sup 2} substrates. The films were characterized using optical and electrical techniques, to increase the understanding of the materials and aid in loss analysis. {sm{underscore}bullet} A stand-alone, prototype CdTemore » reaction tank was built and commissioned, allowing the BP Solar team to perform full-scale trials as part of this subcontract. {sm{underscore}bullet} BP Solar installed two outdoor systems for reliability and performance testing. {sm{underscore}bullet} The 2-kW, ground-mounted, grid-connected system contains seventy-two 0.43-m{sup 2} Apollo{reg{underscore}sign} module interconnects. {sm{underscore}bullet} Two modules have been supplied to NREL for evaluation on their Performance and Energy Rating Test bed (PERT) for kWh evaluation. {sm{underscore}bullet} BP Solar further characterized the process waste stream with the aim to close-loop the system. Currently, various pieces of equipment are being investigated for suitability of particle and total organic compound removal.« less

  14. 48 CFR 44.305-2 - Notification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approved. The system approval notification shall identify the class or classes of subcontracts requiring... has revealed sufficient weaknesses in a particular area of subcontracting to warrant special attention...

  15. Final Report: Sintered CZTS Nanoparticle Solar Cells on Metal Foil; July 26, 2011 - July 25, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leidholm, C.; Hotz, C.; Breeze, A.

    2012-09-01

    This is the final report covering 12 months of this subcontract for research on high-efficiency copper zinc tin sulfide (CZTS)-based thin-film solar cells on flexible metal foil. Each of the first three quarters of the subcontract has been detailed in quarterly reports. In this final report highlights of the first three quarters will be provided and details will be given of the final quarter of the subcontract.

  16. 48 CFR 244.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent to Subcontracts 244.202-2 Considerations. (a) Where other than lowest price is the basis for subcontractor selection, has...

  17. Safety Climate and Occupational Stress According to Occupational Accidents Experience and Employment Type in Shipbuilding Industry of Korea.

    PubMed

    Kim, Kyung Woo; Park, Sung Jin; Lim, Hae Sun; Cho, Hm Hak

    2017-09-01

    Safety climate and occupational stress are related with occupational accident. The present study tried to identify the differences in safety climate and occupational stress according to occupational accidents experience and employment type (e.g., direct workers and subcontract workers). In this study, we conducted a survey using safety climate scale and Korean Occupational Stress Scale and classified the participants into four groups: direct workers working for accident-free departments, direct workers working for accident departments, subcontract workers working for accident-free departments, and subcontract workers working for accident departments for 2 years within the same workplace in the shipbuilding industry. The direct workers and subcontract workers showed diverse results in subscales of safety climate and occupational stress. This result is supported by existing studies; however, further study is necessary for more supporting evidence and elaborative methodological approach. The necessity of management for safety climate and psychosocial factor such as occupational stress for both direct workers and subcontract workers as a whole is suggested by this study.

  18. 77 FR 14016 - General Services Administration Acquisition Regulation; Preparation, Submission, and Negotiation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ..., Submission, and Negotiation of Subcontracting Plans; Correction AGENCY: General Services Administration (GSA..., Preparation, Submission, and Negotiation of Subcontracting Plans; Correction. Correction In the information...

  19. 48 CFR 3019.705 - Responsibilities for the contracting officer under the subcontracting program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705...

  20. 48 CFR 19.701 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-based system for small business subcontracting program reporting. Failure to make a good faith effort to... planned subcontracting in support of the specific contract, except that indirect costs incurred for common...

  1. SBA’s Progress in Implementing the Public Law 95-507 Subcontracting and Surety Bond Waiver Provisions has been Limited.

    DTIC Science & Technology

    1981-09-18

    IMP~mnl~~~U LayL 95-507 SubcontractjfQ fd Surety Bond Waiver Provisiolns 3as8en Limted. The Small Business Administration, working with a...Presidential Advisory Committee has no fll ipleetd the small business sub- L ~ 3 cowtractlgpoiin The committee has fo- cused on obtaining subcontracts from...GAO recommends changes SBA should make to nmimize subcontracting opportunities for small businesses . Also, GAO sugssthat the provision for 2 years

  2. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552..., historical performance and significant achievements in placing subcontracts for the same or similar products...

  3. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  4. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  5. 48 CFR 2019.705 - Responsibilities of the contracting officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System NUCLEAR REGULATORY COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705...

  6. 48 CFR 49.108-4 - Authorization for subcontract settlements without approval or ratification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-4 Authorization for subcontract settlements without approval or ratification. (a)(1) The...

  7. 48 CFR 970.4102-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE to acquire utility service(s) by subcontract, i.e., what the benefits are, such as economic..., shall be applied to a subcontract level acquisition for furnishing utility services to a facility owned...

  8. 48 CFR 319.705 - Responsibilities of the Contracting Officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 319.705...

  9. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  10. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  11. 48 CFR 227.304-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracts 227.304-1 General. Interim and final invention reports and notification of all subcontracts for... of Inventions and Subcontracts. [56 FR 36389, July 31, 1991, as amended at 57 FR 53600, Nov. 12, 1992] ...

  12. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.202...) Character and difficulty of subcontracting, including selection, placement, and management of subcontracts...

  13. 48 CFR 952.250-70 - Nuclear hazards indemnity agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... obligation under this contract and shall be unaffected by the death, disability, or termination of existence...) Inclusion in subcontracts. The Contractor shall insert this clause in any subcontract which may involve the...

  14. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  15. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  16. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  17. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  18. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  19. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  20. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  1. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  2. 14 CFR 1274.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Subcontracting dollar threshold. The dollar amount of the cooperative agreement subject to the small business subcontracting policies (includes small business, veteran-owned small business, service-disabled veteran-owned small business, historically underutilized small business, small disadvantaged business, women-owned...

  3. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... feasible units, as appropriate, to facilitate small business participation; (ii) Conducting market research... its subcontracting plan. (e) CMR Responsibilities. Commercial Market Representatives (CMRs) are SBA's... other resources and tools; (4) Counseling small business concerns on how to market themselves to large...

  4. 48 CFR 2944.202 - Contracting officer's evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contracting officer's evaluation. 2944.202 Section 2944.202 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent To Subcontract 2944.202 Contracting officer's...

  5. 48 CFR 44.202-1 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 44.202-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... notification and supporting data to ensure that the proposed subcontract is appropriate for the risks involved... during negotiations, the contracting officer shall identify those subcontracts in paragraph (j) of the...

  6. 13 CFR 121.410 - What are the size standards for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Size Eligibility Requirements for Government Procurement § 121.410 What are the size standards for SBA... Small Business Act, a concern is small for subcontracts which relate to Government procurements if it...

  7. Subcontracting Opportunities with DoD Major Prime Contractors

    DTIC Science & Technology

    1996-06-01

    The Department of Defense (DoD) offers two markets for small business and small disadvantaged business seeking defense contracting and defense...opportunities. The publication exclusively addresses the defense subcontracting opportunities market. The DoD encourages small business and small disadvantaged

  8. 48 CFR 44.301 - Objective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Objective. 44.301 Section... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.301 Objective. The objective of... which the contractor spends Government funds and complies with Government policy when subcontracting...

  9. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...

  10. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  11. 48 CFR 1419.705-2 - Determining the need for a subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Determining the need for a subcontracting plan. 1419.705-2 Section 1419.705-2 Federal Acquisition Regulations System DEPARTMENT OF THE... recommendations offered. ...

  12. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  13. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  14. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  15. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  16. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the best scientific and technological sources, it is important that the contractor not subcontract technical or scientific work without the contracting officer's advance knowledge. During the negotiation of a cost-reimbursement R&D contract, the contracting officer shall obtain complete information...

  17. 48 CFR 1652.244-70 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. 1652.244-70 Section 1652.244-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CLAUSES AND FORMS CONTRACT CLAUSES Texts of FEHBP Clauses...

  18. 42 CFR 422.202 - Participation procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... procedures. (a) Notice and appeal rights. An MA organization that operates a coordinated care plan or network... of groups of physicians, through reasonable procedures that include the following: (1) Written notice... guidelines. (c) Subcontracted groups. An MA organization that operates an MA plan through subcontracted...

  19. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  20. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  1. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  2. 76 FR 74749 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... amend its regulations to implement provisions of the Small Business Jobs Act of 2010 (Jobs Act... used in preparing its bid or proposal during contract performance. SBA also proposed to amend its... and evaluating small business subcontracting plan performance. SBA also proposed to clarify which...

  3. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 30.001...

  4. 48 CFR 2919.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...

  5. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS) rules and regulations for which a contractor or subcontractor— (1) Used one cost accounting practice to...

  6. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  7. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  8. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  9. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  10. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  11. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  12. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  13. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  14. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  15. 48 CFR 1252.217-74 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracts. 1252.217-74 Section 1252.217-74 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CLAUSES AND FORMS...) Nothing contained in the contract shall be construed as creating any contractual relationship between any...

  16. 14 CFR § 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  17. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  18. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  19. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  20. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  1. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other resources and tools; (4) Counseling small business concerns on how to market themselves to large... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Subcontracting assistance. 125.3 Section 125.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION GOVERNMENT CONTRACTING PROGRAMS...

  2. Subcontracted activities related to TES for building heating and cooling

    NASA Technical Reports Server (NTRS)

    Martin, J.

    1980-01-01

    The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.

  3. 29 CFR 4.114 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Covered Contracts Generally § 4.114 Subcontracts. (a) “Contractor” as including “subcontractor... contractor undertakes a contract subject to the Act, the contractor agrees to assume the obligation that the...

  4. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  5. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  6. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  7. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  8. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  9. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  10. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  11. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  12. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  13. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  14. 48 CFR 49.108-7 - Government assistance in settling subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government assistance in settling subcontracts. 49.108-7 Section 49.108-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-7 Government assistance in...

  15. 48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 49.107 Section 49.107 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49...

  16. 48 CFR 12.500 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items and... law that are not applicable to— (1) Contracts for the acquisition of commercial items; (2) Subcontracts, at any tier, for the acquisition of commercial items; and (3) Contracts and subcontracts, at any...

  17. 77 FR 29983 - Federal Acquisition Regulation; Information Collection; Subcontract Consent

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... performance of functions of the Federal Acquisition Regulation (FAR), and whether it will have practical... The objective of consent to subcontract, as discussed in FAR Part 44, is to evaluate the efficiency and effectiveness with which the contractor spends Government funds, and complies with Government...

  18. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  19. 48 CFR 52.219-26 - Small Disadvantaged Business Participation Program-Incentive Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT CLAUSES Text of Provisions and Clauses 52.219-26 Small Disadvantaged Business Participation... the following: Small Disadvantaged Business Participation Program—Incentive Subcontracting (OCT 2000... its offer to try to award a certain amount to small disadvantaged business concerns in the North...

  20. 41 CFR 51-4.4 - Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Subcontracting. 51-4.4 Section 51-4.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... both with efficient performance in furnishing commodities or services under the JWOD Act and maximizing...

  1. 48 CFR 9.104-3 - Application of standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the... requires a subcontracting plan pursuant to Subpart 19.7, The Small Business Subcontracting Program, the... prospective contractor's responsibility. (d)(1) Small business concerns. Upon making a determination of...

  2. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  3. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  4. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  5. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  6. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  7. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  8. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  9. PVMaT 1998 overview

    NASA Astrophysics Data System (ADS)

    Mittchell, Richard L.; Symko-Davies, Martha; Thomas, Holly P.; Witt, C. Edwin

    1999-03-01

    The Photovoltaic Manufacturing Technology (PVMaT) Project is a government/industry research and development (R&D) partnership between the U.S. federal government (through the U.S. Department of Energy [DOE]) and members of the U.S. PV industry. The goals of PVMaT are to assist the U.S. PV industry improve module manufacturing processes and equipment; accelerate manufacturing cost reductions for PV modules, balance-of-systems components, and integrated systems; increase commercial product performance and reliability; and enhance investment opportunities for substantial scale-ups of U.S.-based PV manufacturing plant capacities. The approach for PVMaT has been to cost-share the R&D risk as industry explores new manufacturing options and ideas for improved PV modules and components, advances system and product integration, and develops new system designs. These activities will lead to overall reduced system life-cycle costs for reliable PV end-products. The 1994 PVMaT Product-Driven BOS and Systems activities, as well as Product-Driven Module Manufacturing R&D activities, are just being completed. Fourteen new subcontracts have just been awarded in the areas of PV System and Component Technology and Module Manufacturing Technology. Government funding, subcontractor cost-sharing, and a comparison of the relative efforts by PV technology throughout the PVMaT project are also discussed.

  10. 48 CFR 52.219-16 - Liquidated Damages-Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following clause: Liquidated Damages—Subcontracting Plan (JAN 1999) (a) Failure to make a good faith effort... has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have...

  11. 48 CFR 970.1907 - Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Business, Small Disadvantaged Business and Woman-Owned Small Business Concerns. 970.1907 Section 970.1907... MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907 Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

  12. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  13. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and subcontract incentives, fees, and profits associated with the increased or decreased costs to the... increase or decrease in contract and subcontracts incentives, fees, and profits associated with the... desirable and not detrimental to the Government and is, therefore, not subject to the no increased cost...

  14. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  15. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  16. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  17. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... economic development of resources in Burma. 537.410 Section 537.410 Money and Finance: Treasury Regulations... BURMESE SANCTIONS REGULATIONS Interpretations § 537.410 Contracts and subcontracts regarding economic... supervision and guarantee of another person's performance of a contract that includes the economic development...

  18. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  19. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  20. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  1. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  2. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  3. 48 CFR 49.108-8 - Assignment of rights under subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Assignment of rights under subcontracts. 49.108-8 Section 49.108-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-8 Assignment of rights under...

  4. 48 CFR 1449.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 1449.107 Section 1449.107 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1449...

  5. 48 CFR 44.400 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 44.400 Scope... required to apply to any subcontractors that are furnishing commercial items or commercial components in accordance with Section 8002(b)(2) of Public Law 103-355 and Section 826 of Public Law 110-181 (10 U.S.C...

  6. 48 CFR 252.219-7003 - Small business subcontracting plan (DoD contracts).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7003 Small business subcontracting plan (DoD contracts). As prescribed in 219.708(b)(1)(A), use the following clause: Small Business...

  7. 77 FR 44047 - Federal Acquisition Regulation; Reporting Executive Compensation and First-Tier Subcontract Awards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... Compensation B. Definitions C. Thresholds D. Paperwork Burden E. Applicability F. Subcontract Award Data G... definition of ``first- tier subcontractor.'' Comment: A number of respondents believed that executive... technologies and ideas, and increase the Government's costs by reducing competition. These respondents also...

  8. 77 FR 56709 - Proposed Information Collection (VA Subcontracting Report for Service Disabled Veteran-Owned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ..., Federal agencies are required to publish notice in the Federal Register concerning each proposed... response to the notice. This notice solicits comments on information needed to collect information from subcontractors to compare information obtained from subcontracting plans submitted by prime contractors in order...

  9. 25 CFR 900.136 - Do tribal employment rights ordinances apply to construction contracts and subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Do tribal employment rights ordinances apply to... OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER... rights ordinances apply to construction contracts and subcontracts? Yes. Tribal employment rights...

  10. 48 CFR 752.226-2 - Subcontracting with disadvantaged enterprises.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management and daily business are controlled by one or more such individuals. (2) Owned by socially and... disadvantaged enterprises. 752.226-2 Section 752.226-2 Federal Acquisition Regulations System AGENCY FOR... Clauses 752.226-2 Subcontracting with disadvantaged enterprises. As prescribed in 726.7007, insert the...

  11. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  12. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  13. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  14. 48 CFR 52.209-6 - Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Protecting the Government....209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. As prescribed in 9.409, insert the following clause: Protecting the...

  15. Archived Appendices | NREL

    Science.gov Websites

    subcontract or NREL Procurement. Appendix B-1 (07/11/14) Standard Terms and Conditions for (1) Cost Sharing , (2) Cost Reimbursement, and (3) Cost Plus Fixed Fee. Appendix B-2 (07/11/14) Standard Terms and Conditions for Cost Type Subcontracts with Educational Institutions Appendix B-10 (07/11/14) Standard Terms

  16. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  17. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  18. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  19. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  20. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  1. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  2. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  3. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  4. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  5. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  6. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  7. 13 CFR 121.411 - What are the size procedures for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the size procedures for SBA's Section 8(d) Subcontracting Program? 121.411 Section 121.411 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and Standards...

  8. 48 CFR 52.232-27 - Prompt payment for construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the... include such clauses in their subcontracts with each lower-tier subcontractor or supplier. (d) Subcontract... impair the right of the Contractor or a subcontractor at any tier to negotiate, and to include in their...

  9. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  10. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  11. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  12. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  13. Bureaucratic versus Craft Administration: The Relationship of Market Structure to the Construction Firm.

    ERIC Educational Resources Information Center

    Eccles, Robert G.

    1981-01-01

    Examines the factors that influence subcontracting and type of management in the construction industry. Argues that subcontracting is explained by a construction firm's size, complexity, and market extent, and that management type results from a firm's size and role in the production process and from census classification problems. (Author/RW)

  14. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  15. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  16. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  17. 48 CFR 19.707 - The Small Business Administration's role in carrying out the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... nature; and (4) Evaluate compliance with subcontracting plans, either on a contract-by-contract basis, or...

  18. 77 FR 70210 - Agency Information Collection (VA Subcontracting Report for Service Disabled Veteran-owned Small...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Subcontracting Report for Service Disabled Veteran-owned Small Business and Veteran-owned Small Business Concerns) Activities Under OMB Review AGENCY: Office of Small and Disadvantaged Business Utilization, Department of... U.S.C. 3501-3521), this notice announces that the Office of Small and Disadvantaged Business...

  19. 48 CFR 52.215-22 - Limitations on Pass-Through Charges-Identification of Subcontract Effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The offeror's proposal shall exclude excessive pass-through charges. (c) Performance of work by the..., under the contract, task order, or delivery order. (2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery...

  20. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  1. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  2. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  3. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  4. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  5. 48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...

  6. 13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...

  7. 48 CFR 13.005 - List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition threshold. 13.005 Section 13.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES...

  8. Prospects for detection of target-dependent annual modulation in direct dark matter searches

    DOE PAGES

    Nobile, Eugenio Del; Gelmini, Graciela B.; Witte, Samuel J.

    2016-02-03

    Earth's rotation about the Sun produces an annual modulation in the expected scattering rate at direct dark matter detection experiments. The annual modulation as a function of the recoil energy E R imparted by the dark matter particle to a target nucleus is expected to vary depending on the detector material. However, for most interactions a change of variables from E R to v min, the minimum speed a dark matter particle must have to impart a fixed E R to a target nucleus, produces an annual modulation independent of the target element. We recently showed that if the darkmore » matter-nucleus cross section contains a non-factorizable target and dark matter velocity dependence, the annual modulation as a function of v min can be target dependent. Here we examine more extensively the necessary conditions for target-dependent modulation, its observability in present-day experiments, and the extent to which putative signals could identify a dark matter-nucleus differential cross section with a non-factorizable dependence on the dark matter velocity.« less

  9. Development of the low-field side reflectometer for ITER

    NASA Astrophysics Data System (ADS)

    Muscatello, Christopher; Anderson, James; Gattuso, Anthony; Doyle, Edward; Peebles, William; Seraydarian, Raymond; Wang, Guiding; Kramer, Gerrit; Zolfaghari, Ali; Atomics Team, General; University of California Los Angeles Team; Princeton Plasma Physics Laboratory Team

    2017-10-01

    The Low-Field Side Reflectometer (LFSR) for ITER will provide real-time edge density profiles every 10 ms for feedback control and every 24 μs for physics evaluation. The spatial resolution will be better than 5 mm over 30 - 165 GHz, probing the scrape-off layer to the top of the pedestal in H-mode plasmas. An antenna configuration has been selected for measurements covering anticipated plasma elevations. Laboratory validation of diagnostic performance is underway using a LFSR transmission line (TL) mockup. The 40-meter TL includes circular corrugated waveguide, length calibration feature, Gaussian telescope, vacuum windows, containment membranes, and expansion joint. Transceiver modules coupled to the input of the TL provide frequency-modulated (FM) data for evaluation of performance as a monostatic reflectometer. Results from the mockup tests are presented and show that, with some further optimization, the LFSR will meet or exceed the measurement requirements for ITER. An update of the LFSR instrumentation design status is also presented with preliminary test results. Work supported by PPPL under subcontract S013252-A.

  10. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  11. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  12. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  13. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  14. 2 CFR 1326.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1326.220 Section 1326.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  15. 2 CFR 1200.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1200.220 Section 1200.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  16. Wetland Biomass Production: emergent aquatic management options and evaluations. A final subcontract report. [Includes a bibliography containing 686 references on Typha from biological abstracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, D.C.; Dubbe, D.R.; Garver, E.G.

    1984-07-01

    The high yield potential and attractive chemical composition of Typha make it a particularly viable energy crop. The Minnesota research effort has demonstrated that total annual biomass yields equivalent to 30 dry tonnes/ha (13 tons/acre) are possible in planted stands. This compares with yields of total plant material between 9 and 16 dry tonnes/ha (4 to 7 tons/acre) in a typical Minnesota corn field. At least 50% of the Typha plant is comprised of a belowground rhizome system containing 40% starch and sugar. This high level of easily fermentable carbohydrate makes rhizomes an attractive feedstock for alcohol production. The abovegroundmore » portion of the plant is largely cellulose, and although it is not easily fermentable, it can be gasified or burned. This report is organized in a manner that focuses on the evaluation of the management options task. Results from stand management research performed at the University of Minnesota during 1982 and 1983 are integrated with findings from an extensive survey of relevant emergent aquatic plant research and utilization. These results and findings are then arranged in sections dealing with key steps and issues that need to be dealt with in the development of a managed emergent aquatic bio-energy system. A brief section evaluating the current status of rhizome harvesting is also included along with an indexed bibliography of the biology, ecology, and utilization of Typha which was completed with support from this SERI subcontract. 686 references, 11 figures, 17 tables.« less

  17. NCPV FY 1998 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R. D.; Hansen, A.

    1999-07-19

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) from October 1, 1997 through September 30, 1998 (FY 1998). The NCPV is part of the U.S. Department of Energy's (DOE's) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996-2000. The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy--as an industry and as an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership inmore » research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV provides leadership and support to the national program toward achieving its mission and goals.« less

  18. 75 FR 56527 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... manufactured, shipped, and/or imported solar thermal collectors and/or photovoltaic modules and cells. The EIA... request. SUMMARY: The EIA has submitted the forms EIA-63A, ``Annual Solar Thermal Collector Manufacturers Survey,'' EIA-63B, ``Annual Photovoltaic Module/Cell Manufacturers Survey,'' and the EIA-902, ``Annual...

  19. 2 CFR 1125.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1125.220 Section 1125.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  20. 2 CFR 1400.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1400.220 Section 1400.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  1. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... determine whether a Participant is small for a particular 8(a) BD subcontract? (a) Self certification by... agency. The Participant also must submit a copy of its offer, including its self-certification as to size... nonmanufacturer rule to, 8(a) BD procurements. (b) Verification of size by SBA. Within 30 days of its receipt of a...

  2. Evaluation of Subcontract Price Proposals

    DTIC Science & Technology

    1990-04-09

    This is the final report on the Audit of the Evaluation of Subcontract Price Proposals. Comments on a draft of this report were considered in...preparing the final report. We made the audit from October 1987 through May 198% The initial objectives of the audit were to evaluate procedures used by...assist audit reports were used by procurement contracting officers in negotiating contract prices. During the audit , we expanded our objectives to

  3. Under pressure, out of control, or home alone? Reviewing research and policy debates on the occupational health and safety effects of outsourcing and home-based work.

    PubMed

    Quinlan, Michael; Bohle, Philip

    2008-01-01

    The practice of outsourcing or subcontracting of work has grown rapidly in most countries over the past two decades. Outsourcing, de-institutionalization, and a range of other practices have also resulted in a growth of home-based work. Home-based workers, even when not part of a subcontracting process, operate in an isolated situation remote from their employer and other workers. Do such work arrangements expose workers to greater risk of injury, illness, or assault? The authors reviewed international studies of the occupational health and safety (OHS) effects of subcontracting and home-based work undertaken over the past 20 years. Of the 25 studies analyzed, 92 percent found poorer OHS outcomes. The studies were examined for clues about the reasons for these negative outcomes. The authors also identified similarities and differences between subcontracting and home-based work. Despite the evidence of poor OHS outcomes, research into outsourcing has stalled in recent years. With notable exceptions, governments have taken little account of findings on these work arrangements in their laws and policies, in part because neoliberal ideas dominate national and global policy agendas. The authors examine policy challenges and regulatory responses and make suggestions for future research and policy interventions.

  4. Modulation of PPAR-Gamma Signaling in Prostatic Carcinogenesis

    DTIC Science & Technology

    2009-09-01

    AD_________________ AWARD NUMBER: W81XWH-07-1-0479 TITLE: Modulation of PPAR -Gamma Signaling in...REPORT TYPE Annual 3. DATES COVERED 1 Sep 2008 – 1 Sep 2009 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Modulation of PPAR -Gamma Signaling in...4 Annual Report PCRP Idea Development Award W81XWH-07-1-0479 Modulation of PPAR -Gamma Signaling in Prostatic Carcinogenesis P.I. Simon W

  5. Poor Government Oversight of Anham and Its Subcontracting Procedures Allowed Questionable Costs To Go Undetected

    DTIC Science & Technology

    2011-07-30

    contractor purchasing system review of Anham. Management Comments and Audit Response The Defense Contract Mangement Agency and the U.S. Central... Introduction 1  Background 1  Government Agency Roles and Oversight Responsibilities 4  Objectives 7  Weak Government Oversight Resulted in Significant...Subcontracting Procedures Allowed Questionable Costs To Go Undetected SIGIR 11-022 July 30, 2011 Introduction Since 2003, the United States Government

  6. Search for an Annual Modulation in a p-Type Point Contact Germanium Dark Matter Detector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aalseth, Craig E.; Barbeau, Phil; Colaresi, J.

    2011-09-01

    Fifteen months of cumulative CoGeNT data are examined for indications of an annual modulation, a predicted signature of Weakly Interacting Massive Particle (WIMP) interactions. Presently available data support the presence of a modulated component of unknown origin, with parameters prima facie compatible with a galactic halo composed of light-mass WIMPs.

  7. Search for an Annual Modulation in a p-Type Point Contact Germanium Dark Matter Detector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbeau, P.S.; Collar, J.I.; Fields, N.

    2011-01-01

    Fifteen months of cumulative CoGeNT data are examined for indications of an annual modulation, a predicted signature of weakly interacting massive particle (WIMP) interactions. Presently available data support the presence of a modulated component of unknown origin, with parameters prima facie compatible with a galactic halo composed of light-mass WIMPs. Unoptimized estimators yield a statistical significance for a modulation of {approx}2.8{sigma}, limited by the short exposure.

  8. Search for an Annual Modulation in a p-Type Point Contact Germanium Dark Matter Detector

    NASA Astrophysics Data System (ADS)

    Aalseth, C. E.; Barbeau, P. S.; Colaresi, J.; Collar, J. I.; Diaz Leon, J.; Fast, J. E.; Fields, N.; Hossbach, T. W.; Keillor, M. E.; Kephart, J. D.; Knecht, A.; Marino, M. G.; Miley, H. S.; Miller, M. L.; Orrell, J. L.; Radford, D. C.; Wilkerson, J. F.; Yocum, K. M.

    2011-09-01

    Fifteen months of cumulative CoGeNT data are examined for indications of an annual modulation, a predicted signature of weakly interacting massive particle (WIMP) interactions. Presently available data support the presence of a modulated component of unknown origin, with parameters prima facie compatible with a galactic halo composed of light-mass WIMPs. Unoptimized estimators yield a statistical significance for a modulation of ˜2.8σ, limited by the short exposure.

  9. LDRD 2013 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bookless, W.

    This LDRD project establishes a research program led by Jingguang Chen, who has started a new position as a Joint Appointee between BNL and Columbia University as of FY2013. Under this project, Dr. Chen will establish a new program in catalysis science at BNL and Columbia University. The LDRD program will provide initial research funding to start research at both BNL and Columbia. At BNL, Dr. Chen will initiate laboratory research, including hiring research staff, and will collaborate with the existing BNL catalysis and electrocatalysis research groups. At Columbia, a subcontract to Dr. Chen will provide startup funding for hismore » laboratory research, including initial graduate student costs. The research efforts will be linked under a common Catalysis Program in Sustainable Fuels. The overall impact of this project will be to strengthen the BNL catalysis science program through new linked research thrusts and the addition of an internationally distinguished catalysis scientist.« less

  10. High Efficiency Thin Film CdTe and a-Si Based Solar Cells: Final Technical Report, 4 March 1998--15 October 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Compaan, A. D.; Deng, X.; Bohn, R. G.

    2003-10-01

    This is the final report covering about 42 months of this subcontract for research on high-efficiency CdTe-based thin-film solar cells and on high-efficiency a-Si-based thin-film solar cells. Phases I and II have been extensively covered in two Annual Reports. For this Final Report, highlights of the first two Phases will be provided and then detail will be given on the last year and a half of Phase III. The effort on CdTe-based materials is led by Prof. Compaan and emphasizes the use of sputter deposition of the semiconductor layers in the fabrication of CdS/CdTe cells. The effort on high-efficiency a-Simore » materials is led by Prof. Deng and emphasizes plasma-enhanced chemical vapor deposition for cell fabrication with major efforts on triple-junction devices.« less

  11. Bioengineering aspects of inorganic carbon supply to mass algal cultures. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldman, J.C.

    1980-06-01

    The work included in this report is part of an ongoing study (currently funded by the Solar Energy Research Institute - Subcontract No. XR-9-8144-1) on the inorganic carbon requirements of microalgae under mass culture conditions and covers the period June 1, 1978 through May 31, 1979. It is divided into two parts appended herein. The first part is a literature review on the inorganic carbon chemical system in relation to algal growth requirements, and the second part deals with the kinetics of inorganic carbon-limited growth of two freshwater chlorophytes including the effect of carbon limitation on cellular chemical composition. Additionalmore » experiment research covered under this contract was reported in the Proceedings of the 3rd Annual Biomass Energy Systems Conferences, pp. 25-32, Bioengineering aspects of inorganic carbon supply to mass algal cultures. Report No. SERI/TP-33-285.« less

  12. DCERP Annual Technical Report III: March 2009-February 2010. Executive Summary

    DTIC Science & Technology

    2010-04-01

    groundwater passing though marshes to the estuary. Loading estimates may vary considerably depending on inter-annual hydrologic (storm versus drought ...climatic events (i.e., hurricanes and droughts ); and integrate results with the other DCERP modules. The benefits of the Aquatic/Estuarine Module...inter-annual hydrologic (storm versus drought years) variability. ▪ Several large phytoplankton blooms in mid-estuary to upper estuary locations

  13. Transcriptional Modulation of Tumor-Associated Macrophages to Facilitate Prostate Cancer Immunotherapy

    DTIC Science & Technology

    2017-09-01

    AWARD NUMBER: W81XWH-16-1-0334 TITLE : TRANSCRIPTIONAL MODULATION OF TUMOR-ASSOCIATED MACROPHAGES TO FACILITATE PROSTATE CANCER IMMUNOTHERAPY...OF REPORT: Annual PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT...Annual 3. DATES COVERED (From - To) 1SEP2016 - 31AUG2017 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER TRANSCRIPTIONAL MODULATION OF TUMOR-ASSOCIATED

  14. Effect of gravitational focusing on annual modulation in dark-matter direct-detection experiments.

    PubMed

    Lee, Samuel K; Lisanti, Mariangela; Peter, Annika H G; Safdi, Benjamin R

    2014-01-10

    The scattering rate in dark-matter direct-detection experiments should modulate annually due to Earth's orbit around the Sun. The rate is typically thought to be extremized around June 1, when the relative velocity of Earth with respect to the dark-matter wind is maximal. We point out that gravitational focusing can alter this modulation phase. Unbound dark-matter particles are focused by the Sun's gravitational potential, affecting their phase-space density in the lab frame. Gravitational focusing can result in a significant overall shift in the annual-modulation phase, which is most relevant for dark matter with low scattering speeds. The induced phase shift for light O(10)  GeV dark matter may also be significant, depending on the threshold energy of the experiment.

  15. Improved Transparent Conducting Oxides for Photovoltaics: Final Research Report, 1 May 1999--31 December 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mason, T. O.; Chang, R. P. H.; Marks, T. J.

    2003-10-01

    This subcontract focused on next-generation transparent conducting oxides (TCOs) for improved PV performance. More specifically, there were two research foci: (1) improved Sn-based, n-type TCOs aimed at enhanced CdTe PV cell performance, and (2) novel Cu-based, p-type TCOs applicable to a variety of PV designs. The objective of the research under this subcontract was to identify, explore, evaluate, and develop future generations of photovoltaic technologies that can meet the long-term goal of producing low-cost electricity from sunlight.

  16. Modulation of Root Microbiome Community Assembly by the Plant Immune Response (2013 DOE JGI Genomics of Energy and Environment 8th Annual User Meeting)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lebeis, Sarah

    2013-03-01

    Sarah Lebeis of University of North Carolina on Modulation of root microbiome community assembly by the plant immune response at the 8th Annual Genomics of Energy Environment Meeting on March 28, 2013 in Walnut Creek, CA.

  17. Annual modulation of seismicity along the San Andreas Fault near Parkfield, CA

    USGS Publications Warehouse

    Christiansen, L.B.; Hurwitz, S.; Ingebritsen, S.E.

    2007-01-01

    We analyze seismic data from the San Andreas Fault (SAF) near Parkfield, California, to test for annual modulation in seismicity rates. We use statistical analyses to show that seismicity is modulated with an annual period in the creeping section of the fault and a semiannual period in the locked section of the fault. Although the exact mechanism for seasonal triggering is undetermined, it appears that stresses associated with the hydrologic cycle are sufficient to fracture critically stressed rocks either through pore-pressure diffusion or crustal loading/ unloading. These results shed additional light on the state of stress along the SAF, indicating that hydrologically induced stress perturbations of ???2 kPa may be sufficient to trigger earthquakes.

  18. Simulated potential for enhanced performance of mechanically stacked hybrid III–V/Si tandem photovoltaic modules using DC–DC converters

    DOE PAGES

    MacAlpine, Sara; Bobela, David C.; Kurtz, Sarah; ...

    2017-10-01

    This work examines a tandem module design with GaInP2 mechanically stacked on top of crystalline Si, using a detailed photovoltaic (PV) system model to simulate four-terminal (4T) unconstrained and two-terminal voltage-matched (2T VM) parallel architectures. Module-level power electronics is proposed for the 2T VM module design to enhance its performance over the breadth of temperatures experienced by a typical PV installation. Annual, hourly simulations of various scenarios indicate that this design can reduce annual energy losses to ~0.5% relative to the 4T module configuration. Consideration is given to both performance and practical design for building or ground mount installations, emphasizingmore » compatibility with existing standard Si modules.« less

  19. Simulated potential for enhanced performance of mechanically stacked hybrid III–V/Si tandem photovoltaic modules using DC–DC converters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacAlpine, Sara; Bobela, David C.; Kurtz, Sarah

    This work examines a tandem module design with GaInP2 mechanically stacked on top of crystalline Si, using a detailed photovoltaic (PV) system model to simulate four-terminal (4T) unconstrained and two-terminal voltage-matched (2T VM) parallel architectures. Module-level power electronics is proposed for the 2T VM module design to enhance its performance over the breadth of temperatures experienced by a typical PV installation. Annual, hourly simulations of various scenarios indicate that this design can reduce annual energy losses to ~0.5% relative to the 4T module configuration. Consideration is given to both performance and practical design for building or ground mount installations, emphasizingmore » compatibility with existing standard Si modules.« less

  20. Simulated potential for enhanced performance of mechanically stacked hybrid III-V/Si tandem photovoltaic modules using DC-DC converters

    NASA Astrophysics Data System (ADS)

    MacAlpine, Sara; Bobela, David C.; Kurtz, Sarah; Lumb, Matthew P.; Schmieder, Kenneth J.; Moore, James E.; Walters, Robert J.; Alberi, Kirstin

    2017-10-01

    This work examines a tandem module design with GaInP2 mechanically stacked on top of crystalline Si, using a detailed photovoltaic (PV) system model to simulate four-terminal (4T) unconstrained and two-terminal voltage-matched (2T VM) parallel architectures. Module-level power electronics is proposed for the 2T VM module design to enhance its performance over the breadth of temperatures experienced by a typical PV installation. Annual, hourly simulations of various scenarios indicate that this design can reduce annual energy losses to ˜0.5% relative to the 4T module configuration. Consideration is given to both performance and practical design for building or ground mount installations, emphasizing compatibility with existing standard Si modules.

  1. The Modulated Annual Cycle: An Alternative Reference Frame for Climate Anomalies

    NASA Astrophysics Data System (ADS)

    Wu, Z.

    2007-12-01

    In climate science, an anomaly is the deviation of a quantity from its annual cycle (AC). There are many ways to define annual cycle. Traditionally, the annual cycle is taken to be an exact repetition of itself year after year. This stationary annual cycle may not reflect well the intrinsic nonlinearity of the climate system, especially under external forcing. In this study, we have reexamined the reference frame for anomalies by reexamining the annual cycle. We propose an alternative reference frame, the modulated annual cycle (MAC) that allows the annual cycle to change from year to year, for defining anomalies. In order for this alternative reference frame to be useful, we need to be able to define the instantaneous annual cycle. We therefore also introduce a new method to extract the MAC from climatic data. In the presence of an MAC, modulated in both amplitude and frequency, we can then define an alternative version of an anomaly, this time with respect to the instantaneous MAC rather than a permanent and unchanging AC. Based on this alternative definition of anomalies, we reexamine some familiar physical processes: in particular, the sea surface temperature (SST) reemergence and the ENSO phase locking to the annual cycle. We find that the re-emergence mechanism may be alternatively interpreted as an explanation of the change of the annual cycle instead of the interannual to interdecadal persistence of SST anomalies. We also find that the ENSO phase locking can largely be attributed to the residual annual cycle (the difference of the MAC and the corresponding traditional annual cycle) contained in the traditional anomaly, and, therefore, can be alternatively interpreted as a part of the annual cycle phase locked to the annual cycle itself. Two additional examples are also presented of the implications of using a MAC against which to define anomalies. We show that using MAC as a reference framework for anomaly can bypass the difficulty brought by concepts such as "decadal variability of summer (or winter) climate" for understanding the low-frequency variability of the climate system. We also point out the drawbacks related to the stationary assumption in previous studies of extreme weather and climate and propose instead the appropriateness of choosing a non-stationary framework to study extreme weather and climate events. The concept of an amplitude and frequency modulated annual cycle, a method to extract it, and its implications for the interpretation of physical processes, all may contribute potentially to a more consistent and fruitful way of examining past and future climate variability and change.

  2. The modulated annual cycle: an alternative reference frame for climate anomalies

    NASA Astrophysics Data System (ADS)

    Wu, Zhaohua; Schneider, Edwin K.; Kirtman, Ben P.; Sarachik, E. S.; Huang, Norden E.; Tucker, Compton J.

    2008-12-01

    In climate science, an anomaly is the deviation of a quantity from its annual cycle. There are many ways to define annual cycle. Traditionally, this annual cycle is taken to be an exact repeat of itself year after year. This stationary annual cycle may not reflect well the intrinsic nonlinearity of the climate system, especially under external forcing. In this paper, we re-examine the reference frame for anomalies by re-examining the annual cycle. We propose an alternative reference frame for climate anomalies, the modulated annual cycle (MAC) that allows the annual cycle to change from year to year, for defining anomalies. In order for this alternative reference frame to be useful, we need to be able to define the instantaneous annual cycle: we therefore also introduce a new method to extract the MAC from climatic data. In the presence of a MAC, modulated in both amplitude and frequency, we can then define an alternative version of an anomaly, this time with respect to the instantaneous MAC rather than a permanent and unchanging AC. Based on this alternative definition of anomalies, we re-examine some familiar physical processes: in particular SST re-emergence and ENSO phase locking to the annual cycle. We find that the re-emergence mechanism may be alternatively interpreted as an explanation of the change of the annual cycle instead of an explanation of the interannual to interdecadal persistence of SST anomalies. We also find that the ENSO phase locking can largely be attributed to the residual annual cycle (the difference of the MAC and the corresponding traditional annual cycle) contained in the traditional anomaly, and, therefore, can be alternatively interpreted as a part of the annual cycle phase locked to the annual cycle itself. In addition to the examples of reinterpretation of physics of well known climate phenomena, we also present an example of the implications of using a MAC against which to define anomalies. We show that using MAC as a reference framework for anomaly can bypass the difficulty brought by concepts such as “decadal variability of summer (or winter) climate” for understanding the low-frequency variability of the climate system. The concept of an amplitude and frequency modulated annual cycle, a method to extract it, and its implications for the interpretation of physical processes, all may contribute potentially to a more consistent and fruitful way of examining past and future climate variability and change.

  3. [Organization and technology in the grocery store sector].

    PubMed

    Gambetti, Edy

    2014-01-01

    In Italy, grocery stores develop an annual turnover of 92 billion of , (data referred to 2013) and have 28.232 stores spread over a commercial area of 17.224.000 m2. The business involved are 252, linked with 30 important distribution leader companies. The total workforce is about 280.000 people. The grocery stores structure is composed by suppliers and producers warehouses and different kinds of stores (hypermarkets, supermarkets, shops and discounts). In the stores, the technological progress concerns fundamentally back-office operations; the improvement of information and computer science is the main renewal source. Other tasks as receiving goods and stocking shelves are still executed without specific inovations. In terms of organization, we observed a strong increase of part-time workers, the development of atypical contract and thie inclination to contract the easiest jobs (for example, stocking shelves). Also the warehouses often use to sub-contract the picking tasks. The increase of on-line shopping, also concerning the groceries, represents the most relevant evolution in tire near future.

  4. NREL Photovoltaic Program FY 1996 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's andmore » the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.« less

  5. 76 FR 34287 - Proposed Agency Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ...--Certified Memory Modules 744 Railroads...... 200 certified 2 hours + 200 hours 600 memory modules. for test design. Lead Locomotives w/Certified 744 Railroads...... 600 certified 2 hours 1,200 Module. memory... memory modules. Module. Form(s): FRA F 6180.49A. Total Responses: 5,779,206. Estimated Total Annual...

  6. Wave-driven Equatorial Annual Oscillation Induced and Modulated by the Solar Cycle

    NASA Technical Reports Server (NTRS)

    Mayr, Hans G.; Mengel, John G.; Wolff, Charles

    2005-01-01

    Our model for the solar cycle (SC) modulation of the Quasi-Biennial Oscillation (QBO) produces a hemispherically symmetric 12-month Annual Oscillation (AO) in the zonal winds, which is confined to low latitudes. This Equatorial Annual Oscillation (EAO) is produced by interaction between the anti-symmetric component of SC forcing and the dominant anti-symmetric AO. The EA0 is amplified by the upward propagating small- scale gravity waves (GW), and the oscillation propagates down through the stratosphere like the QBO. The amplitude of the EA0 is relatively small, but its SC modulation contributes significantly to extend the effect to lower altitudes. Although the energy of the EA0 is concentrated at low latitudes, prominent signatures appear in the Polar Regions where the SC produces measurable temperature variations. At lower altitudes, the SC effects are significantly different in the two hemispheres because of the EAO, and due to its GW driven downward propagation the phase of the annual cycle is delayed.

  7. Solar project cost report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, H.J.

    1978-01-01

    This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less

  8. The Department of the Navy Subcontracting Program Update

    DTIC Science & Technology

    2014-08-01

    calculaCon  of  single  FY   acCvity  at  the  contract  level   Tot   Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014   Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0

  9. Federal employees health benefits acquisition regulation: large provider agreements, subcontracts, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The Office of Personnel Management (OPM) is issuing this final regulation to amend the Federal Employees Health Benefits Acquisition Regulation (FEHBAR). It establishes requirements, including audit, for Federal Employees Health Benefits Program (FEHB) experience-rated carriers' Large Provider Agreements. It also modifies the dollar threshold for review of carriers' subcontract agreements; revises the definitions of Cost or Pricing Data and Experience-rate to reflect mental health parity requirements; updates the contract records retention requirement; updates the FEHB Clause Matrix; and conforms subpart and paragraph references to Federal Acquisition Regulation (FAR) revisions made since we last updated the FEHBAR.

  10. Black liquor gasification phase 2D final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohl, A.L.; Stewart, A.E.

    1988-06-01

    This report covers work conducted by Rockwell International under Amendment 5 to Subcontract STR/DOE-12 of Cooperative Agreement DE-AC-05-80CS40341 between St. Regis Corporation (now Champion International) and the Department of Energy (DOE). The work has been designated Phase 2D of the overall program to differentiate it from prior work under the same subcontract. The overall program is aimed at demonstrating the feasibility of and providing design data for the Rockwell process for gasifying Kraft black liquor. In this process, concentrated black liquor is converted into low-Btu fuel gas and reduced melt by reaction with air in a specially designed gasification reactor.

  11. Mobil Solar Energy Corporation thin EFG octagons. Final subcontract report, 1 April 1992--31 January 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalejs, J.P.

    1994-06-01

    Mobil Solar Energy Corporation manufactures photovoltaic modules based on its unique Edge-defined Film-fed Growth (EFG) process for producing octagon-shaped hollow polycrystalline silicon tubes. The octagons are cut by lasers into 100 mm x 100 mm wafers which are suitable for solar cell processing. This process avoids slicing, grinding and polishing operations which are wasteful of material and are typical of most other wafer production methods. EFG wafers are fabricated into solar cells and modules using processes that have been specially developed to allow scaling up to high throughput rates. The goals of the Photovoltaic Manufacturing Technology Initiative (PVMaT) program atmore » Mobil Solar were to improve the EFG manufacturing line through technology advances that accelerate cost reduction in production and stimulate market growth for its product. The program was structured into three main tasks: to decrease silicon utilization by lowering wafer thickness from 400 to 200 {mu}m; to enhance laser cutting yields and throughput while improving the wafer strength; and to raise crystal growth productivity and yield. The technical problems faced and the advances made in the Mobil Solar PVMaT program are described. The author concludes with a presentation of the results of a detailed cost model for EFT module production. This model describes the accelerated reductions in manufacturing costs which are already in place and the future benefits anticipated to result from the technical achievements of the PVMaT program.« less

  12. Goldman - Georgetown University | Division of Cancer Prevention

    Cancer.gov

    Principal Investigator: Radoslav (Rado) Goldman, PhDInstitution: Georgetown University, Washington, DC Subcontract Principal Investigator: Raja Mazumder, PhDInstitution: George Washington University |

  13. The Grid Analysis and Display System (GrADS)

    NASA Technical Reports Server (NTRS)

    Kinter, James L., III

    1994-01-01

    During the period 1 September 1993 - 31 August 1994, further development of the Grid Analysis and Display System (GrADS) was conducted at the Center for Ocean-Land-Atmosphere Studies (COLA) of the Institute of Global Environment and Society, Inc. (IGES) under subcontract 5555-31 from the University Space Research Association (USRA) administered by The Center of Excellence in Space Data and Information Sciences (CESDIS). This final report documents progress made under this subcontract and provides directions on how to access the software and documentation developed therein. A short description of GrADS is provided followed by summary of progress completed and a summary of the distribution of the software to date and the establishment of research collaborations.

  14. Astrophysics-independent bounds on the annual modulation of dark matter signals.

    PubMed

    Herrero-Garcia, Juan; Schwetz, Thomas; Zupan, Jure

    2012-10-05

    We show how constraints on the time integrated event rate from a given dark matter (DM) direct detection experiment can be used to bound the amplitude of the annual modulation signal in another experiment. The method requires only mild assumptions about the properties of the local DM distribution: that it is temporally stable on the scale of months and spatially homogeneous on the ecliptic. We apply the method to the annual modulation signal in DAMA/LIBRA, which we compare to the bounds derived from XENON10, XENON100, cryogenic DM search, and SIMPLE data. Assuming a DM mass of 10 GeV, we show that under the above assumptions about the DM halo, a DM interpretation of the DAMA/LIBRA signal is excluded for several classes of models: at 6.3σ (4.6σ) for elastic isospin conserving (violating) spin-independent interactions, and at 4.9σ for elastic spin-dependent interactions on protons.

  15. PV Module Reliability Workshop | Photovoltaic Research | NREL

    Science.gov Websites

    -year old PV system in Quebec, Canada-Alex Bradley, Tanya Dhir, Yves Poissant Solar panel design factors PV Module Reliability Workshop PV Module Reliability Workshop Tuesday, February 24, 2015 Chair : Michael Kempe The 2015 PV Module Reliability Workshop (PVMRW) continued in the tradition of this annual

  16. Seasonal and inter-annual variability of the net ecosystem CO2 exchange of a temperate mountain grassland: effects of climate and management.

    PubMed

    Wohlfahrt, Georg; Hammerle, Albin; Haslwanter, Alois; Bahn, Michael; Tappeiner, Ulrike; Cernusca, Alexander

    2008-04-27

    The role and relative importance of climate and cutting for the seasonal and inter-annual variability of the net ecosystem CO 2 (NEE) of a temperate mountain grassland was investigated. Eddy covariance CO 2 flux data and associated measurements of the green area index and the major environmental driving forces acquired during 2001-2006 at the study site Neustift (Austria) were analyzed. Driven by three cutting events per year which kept the investigated grassland in a stage of vigorous growth, the seasonal variability of NEE was primarily modulated by gross primary productivity (GPP). The role of environmental parameters in modulating the seasonal variability of NEE was obscured by the strong response of GPP to changes in the amount of green area, as well as the cutting-mediated decoupling of phenological development and the seasonal course of climate drivers. None of the climate and management metrics examined was able to explain the inter-annual variability of annual NEE. This is thought to result from (1) a high covariance between GPP and ecosystem respiration (R eco ) at the annual time scale which results in a comparatively small inter-annual variation of NEE, (2) compensating effects between carbon exchange during and outside the management period, and (3) changes in the biotic response to rather than the climate variables per se. GPP was more important in modulating inter-annual variations in NEE in spring and before the first and second cut, while R eco explained a larger fraction of the inter-annual variability of NEE during the remaining, in particular the post-cut, periods.

  17. Macroeconomic Activity Module - NEMS Documentation

    EIA Publications

    2016-01-01

    Documents the objectives, analytical approach, and development of the National Energy Modeling System (NEMS) Macroeconomic Activity Module (MAM) used to develop the Annual Energy Outlook for 2016 (AEO2016). The report catalogues and describes the module assumptions, computations, methodology, parameter estimation techniques, and mainframe source code

  18. Loop-mediated isothermal amplification method for diagnosing Pneumocystis pneumonia in HIV-uninfected immunocompromised patients with pulmonary infiltrates.

    PubMed

    Nakashima, Kei; Aoshima, Masahiro; Ohkuni, Yoshihiro; Hoshino, Eri; Hashimoto, Kohei; Otsuka, Yoshihito

    2014-12-01

    Loop-mediated isothermal amplification (LAMP) is becoming an established nucleic acid amplification method offering rapid, accurate, and cost-effective diagnosis of infectious diseases. We retrospectively evaluated 78 consecutive HIV-uninfected patients who underwent LAMP method for diagnosing Pneumocystis pneumonia (PCP). Diagnosis of PCP was made by the detection of Pneumocystis jirovecii (P. jirovecii) with positive LAMP or conventional staining (CS) (Grocott methenamine silver staining or Diff-Quick™) on the basis of compatible clinical symptoms and radiologic findings. Additionally, we reviewed HIV-uninfected immunocompromised patients who underwent subcontract PCR as a historical control. LAMP was positive in 10 (90.9%) of 11 positive-CS patients. Among 13 negative-CS patients with positive LAMP, 11 (84.6%) had PCP, and the remaining 2 were categorized as having P. jirovecii colonization. LDH levels in negative-CS PCP were higher than in positive-CS PCP (p = 0.026). (1 → 3)-β-D-glucan levels in negative-CS PCP were lower than in positive-CS PCP (p = 0.011). The interval from symptom onset to diagnosis as PCP in LAMP group (3.45 ± 1.77 days; n = 22) was shorter than in subcontract PCR group (6.90 ± 2.28 days; n = 10; p < 0.001). As for patients without PCP, duration of unnecessary PCP treatment in LAMP group (2; 2-3 days; n = 10) was shorter than in subcontract PCR group (7; 7-12.25 days; n = 6; p = 0.003). LAMP showed higher sensitivity (95.4%) and positive predictive value (91.3%) than subcontract PCR did. Pneumocystis LAMP method is a sensitive and cost-effective diagnostic method and is easy to administer in general hospitals. In-house LAMP method would realize early diagnosis of PCP, resulting in improving PCP prognosis and reducing unnecessary PCP-specific treatment. Copyright © 2014 Japanese Society of Chemotherapy and The Japanese Association for Infectious Diseases. Published by Elsevier Ltd. All rights reserved.

  19. Renewable Fuels Module - NEMS Documentation

    EIA Publications

    2017-01-01

    This report documents the objectives, analytical approach, and design of the National Energy Modeling System (NEMS) Renewable Fuels Module (RFM) as it relates to the production of the Annual Energy Outlook forecasts.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saccomanno, G.

    ''Early Lung Cancer Detection in Uranium Miners with Abnormal Sputum Cytology'' was funded by the Department of Energy to monitor the health effects of radon exposure and/or cigarette smoke on uranium workers from the Colorado Plateau. The resulting Saccomanno Uranium Workers Archive and data base has been used as a source of information to prove eligibility for compensation under the Radiation Exposure Compensation Act and as the source of primary data tissue for a subcontract and other collaborations with outside investigators. The latter includes a study of radon exposure and lung cancer risk in a non-smoking cohort of uranium minersmore » (subcontract); a study of genetic markers for lung cancer susceptibility; and a study of {sup 210}Pb accumulation in the skull as a biomarker of radon exposure.« less

  1. Calendar year 2002 annual site environmental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie

    2003-09-01

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).« less

  2. Calendar year 2003 : annual site enviromental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie

    2004-09-01

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2003. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2003) and DOE Order 231.1 Chg 2., Environment, Safety, and Health Reporting (DOE 1996).« less

  3. Monitoring Uranium Transformations Determined by the Evolution of Biogeochemical Processes: Design of Mixed Batch Reactor and Column Studies at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Criddle, Craig S.; Wu, Weimin

    2013-04-17

    With funds provided by the US DOE, Argonne National Laboratory subcontracted the design of batch and column studies to a Stanford University team with field experience at the ORNL IFRC, Oak Ridge, TN. The contribution of the Stanford group ended in 2011 due to budget reduction in ANL. Over the funded research period, the Stanford research team characterized ORNL IFRC groundwater and sediments and set up microcosm reactors and columns at ANL to ensure that experiments were relevant to field conditions at Oak Ridge. The results of microcosm testing demonstrated that U(VI) in sediments was reduced to U(IV) with themore » addition of ethanol. The reduced products were not uraninite but were instead U(IV) complexes associated with Fe. Fe(III) in solid phase was only partially reduced. The Stanford team communicated with the ANL team members through email and conference calls and face to face at the annual ERSP PI meeting and national meetings.« less

  4. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...

  5. 48 CFR 44.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... purchasing system or performance is inadequate; (2) Close working relationships or ownership affiliations... subcontracting with small, veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged and women...

  6. 75 FR 70031 - Antitrust Division

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ...) operate a branding program based upon distinctive trademarks to create high customer awareness of, demand... or subcontract a branding program; (vii) create printed and/or electronic materials for distribution...

  7. NREL to Host Ninth Annual PV Reliability Workshop | News | NREL

    Science.gov Websites

    share research leading to more durable and reliable PV modules, thus reducing the cost of solar to Host Ninth Annual PV Reliability Workshop NREL to Host Ninth Annual PV Reliability Workshop their results during a poster session at the 2017 PV Reliability Workshop. 4 people consult two

  8. Direct dark matter search by annual modulation in XMASS-I

    NASA Astrophysics Data System (ADS)

    Abe, K.; Hiraide, K.; Ichimura, K.; Kishimoto, Y.; Kobayashi, K.; Kobayashi, M.; Moriyama, S.; Nakahata, M.; Norita, T.; Ogawa, H.; Sekiya, H.; Takachio, O.; Takeda, A.; Yamashita, M.; Yang, B. S.; Kim, N. Y.; Kim, Y. D.; Tasaka, S.; Fushimi, K.; Liu, J.; Martens, K.; Suzuki, Y.; Xu, B. D.; Fujita, R.; Hosokawa, K.; Miuchi, K.; Onishi, Y.; Oka, N.; Takeuchi, Y.; Kim, Y. H.; Lee, J. S.; Lee, K. B.; Lee, M. K.; Fukuda, Y.; Itow, Y.; Kegasa, R.; Kobayashi, K.; Masuda, K.; Takiya, H.; Nishijima, K.; Nakamura, S.; Xmass Collaboration

    2016-08-01

    A search for dark matter was conducted by looking for an annual modulation signal due to the Earth's rotation around the Sun using XMASS, a single phase liquid xenon detector. The data used for this analysis was 359.2 live days times 832 kg of exposure accumulated between November 2013 and March 2015. When we assume Weakly Interacting Massive Particle (WIMP) dark matter elastically scattering on the target nuclei, the exclusion upper limit of the WIMP-nucleon cross section 4.3 ×10-41 cm2 at 8 GeV/c2 was obtained and we exclude almost all the DAMA/LIBRA allowed region in the 6 to 16 GeV/c2 range at ∼10-40 cm2. The result of a simple modulation analysis, without assuming any specific dark matter model but including electron/γ events, showed a slight negative amplitude. The p-values obtained with two independent analyses are 0.014 and 0.068 for null hypothesis, respectively. We obtained 90% C.L. upper bounds that can be used to test various models. This is the first extensive annual modulation search probing this region with an exposure comparable to DAMA/LIBRA.

  9. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  10. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  11. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  12. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  13. 75 FR 33269 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Procurement List: Product Wooden Trunk Locker NSN: 8460-00-243-3234. NPA: Employment Source, Inc... competitor enjoying a profitable subcontract forever if the commercial portion of the trunk locker...

  14. 40 CFR 35.938-9 - Subcontracts under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...

  15. 48 CFR 2052.215-75 - Proposal presentation and format.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., education, and employment history of its employees, subcontractor personnel, and consultants, through... and categories, materials, subcontracts, travel, computer time, etc., must be included so that the...

  16. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  17. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  18. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  19. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  20. 48 CFR 3019.705-1 - General support for the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705-1 General support for the program. In any...

  1. Low-Activity Waste Pretreatment System Additional Engineering-Scale Integrated Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landon, Matt R.; Wilson, Robert A.

    Washington River Protections Solutions, LLC’s (WRPS) Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low-activity waste (ILAW) by feeding LAW directly from Tank Farms to the Waste Treatment and Immobilization Plant (WTP) LAW Facility, bypassing the WTP Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria (WAC). Full-scale and engineering-scale testing of critical technology elements, as part of the technology maturation process, are components of the overall LAWPS Project. WRPS awarded themore » engineering-scale integrated testing scope to AECOM via WRPS Subcontract 58349. This report is deliverable MSR-008 of the subcontract.« less

  2. Search for Electronic Recoil Event Rate Modulation with 4 Years of XENON100 Data

    NASA Astrophysics Data System (ADS)

    Aprile, E.; Aalbers, J.; Agostini, F.; Alfonsi, M.; Amaro, F. D.; Anthony, M.; Arneodo, F.; Barrow, P.; Baudis, L.; Bauermeister, B.; Benabderrahmane, M. L.; Berger, T.; Breur, P. A.; Brown, A.; Brown, E.; Bruenner, S.; Bruno, G.; Budnik, R.; Bütikofer, L.; Calvén, J.; Cardoso, J. M. R.; Cervantes, M.; Cichon, D.; Coderre, D.; Colijn, A. P.; Conrad, J.; Cussonneau, J. P.; Decowski, M. P.; de Perio, P.; di Gangi, P.; di Giovanni, A.; Diglio, S.; Eurin, G.; Fei, J.; Ferella, A. D.; Fieguth, A.; Franco, D.; Fulgione, W.; Gallo Rosso, A.; Galloway, M.; Gao, F.; Garbini, M.; Geis, C.; Goetzke, L. W.; Greene, Z.; Grignon, C.; Hasterok, C.; Hogenbirk, E.; Itay, R.; Kaminsky, B.; Kessler, G.; Kish, A.; Landsman, H.; Lang, R. F.; Lellouch, D.; Levinson, L.; Lin, Q.; Lindemann, S.; Lindner, M.; Lopes, J. A. M.; Manfredini, A.; Maris, I.; Marrodán Undagoitia, T.; Masbou, J.; Massoli, F. V.; Masson, D.; Mayani, D.; Messina, M.; Micheneau, K.; Miguez, B.; Molinario, A.; Murra, M.; Naganoma, J.; Ni, K.; Oberlack, U.; Pakarha, P.; Pelssers, B.; Persiani, R.; Piastra, F.; Pienaar, J.; Pizzella, V.; Piro, M.-C.; Plante, G.; Priel, N.; Rauch, L.; Reichard, S.; Reuter, C.; Rizzo, A.; Rosendahl, S.; Rupp, N.; Dos Santos, J. M. F.; Sartorelli, G.; Scheibelhut, M.; Schindler, S.; Schreiner, J.; Schumann, M.; Scotto Lavina, L.; Selvi, M.; Shagin, P.; Silva, M.; Simgen, H.; Sivers, M. V.; Stein, A.; Thers, D.; Tiseni, A.; Trinchero, G.; Tunnell, C.; Wang, H.; Wei, Y.; Weinheimer, C.; Wulf, J.; Ye, J.; Zhang, Y.; Xenon Collaboration

    2017-03-01

    We report on a search for electronic recoil event rate modulation signatures in the XENON100 data accumulated over a period of 4 yr, from January 2010 to January 2014. A profile likelihood method, which incorporates the stability of the XENON100 detector and the known electronic recoil background model, is used to quantify the significance of periodicity in the time distribution of events. There is a weak modulation signature at a period of 43 1-14+16 day in the low energy region of (2.0-5.8) keV in the single scatter event sample, with a global significance of 1.9 σ ; however, no other more significant modulation is observed. The significance of an annual modulation signature drops from 2.8 σ , from a previous analysis of a subset of this data, to 1.8 σ with all data combined. Single scatter events in the low energy region are thus used to exclude the DAMA/LIBRA annual modulation as being due to dark matter electron interactions via axial vector coupling at 5.7 σ .

  3. 48 CFR 22.1603 - Exceptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or subcontracts for work performed exclusively outside the United States. (b) Exemptions granted by... ability of the Government to procure goods and services on an economical and efficient basis or if special...

  4. 48 CFR 15.401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.401 Definitions. As used in this subpart— Price means cost plus any fee or profit applicable to the contract type. Subcontract (except as...

  5. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  6. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  7. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  8. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  9. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  10. 42 CFR 480.120 - Information subject to disclosure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts under those contracts (except for proprietary or business information); (3) Copies of documents..., including a study design and methodology. (b) Aggregate statistical information that does not implicitly or...

  11. 48 CFR 919.7011 - Developmental assistance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Engineering and other technical assistance; (3) Noncompetitive award of subcontracts under DOE or other... activities; (5) Progress payments based on costs; (6) Rent-free use of facilities and/or equipment owned or...

  12. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  13. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  14. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  15. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  16. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  17. 24 CFR 882.412 - Subcontracting of owner services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR... HUD approval, rents which exceed the appropriate Moderate Rehabilitation Fair Market Rent for a unit...

  18. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  19. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  20. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  1. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  2. 49 CFR 22.11 - Eligibility criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business with experience in the transportation industry and trade for which the STLP loan is sought; (5) Be...-executed transportation-related contract, subcontract, or purchase order held directly with DOT or with...

  3. A New Front in the Sweatshop Wars?

    ERIC Educational Resources Information Center

    Farrell, Elizabeth F.; Olsen, Florence

    2001-01-01

    Discusses how some prominent institutions prompt debate by subcontracting the labor-intensive work of putting documents online to vendors in developing countries. Libraries counter that contractors treat overseas employees well. (EV)

  4. 76 FR 65190 - Notice of Proposed Information Collection Requests

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-20

    ... Century Community Learning Centers Annual Performance Report. OMB Control Number: 1810-0668. Agency Form... et seq.), is to provide expanded academic enrichment opportunities for children attending low... authorization for the collection of data through Web-based, data-collection modules, the Annual Performance...

  5. 48 CFR 47.504 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., such as agricultural and food-aid shipments; (2) Shipments covered under 46 U.S.C. Appx 1241-1, such as those generated by Export-Import Bank loans or guarantees; (3) Subcontracts under— (i) Government...

  6. Strontium-90 Error Discovered in Subcontract Laboratory Spreadsheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. D. Brown A. S. Nagel

    1999-07-31

    West Valley Demonstration Project health physicists and environment scientists discovered a series of errors in a subcontractor's spreadsheet being used to reduce data as part of their strontium-90 analytical process.

  7. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  8. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  9. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  10. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... contract); (3) Apprentices and Trainees; (4) Payrolls and Basic Records; (5) Compliance with Copeland Act...

  11. International Business Machines (IBM) Corporation Interim Agreement EPA Case No. 08-0113-00

    EPA Pesticide Factsheets

    On March 27, 2008, the United States Environmental Protection Agency (EPA), suspended International Business Machines (IBM) from receiving Federal Contracts, approved subcontracts, assistance, loans and other benefits.

  12. 48 CFR 226.370-8 - Goals and incentives for subcontracting with HBCU/MIs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Historically Black Colleges and Universities and Minority Institutions 226.370-8 Goals and incentives for... educational institutions. (b) The contracting officer may, when contracting by negotiation, use in...

  13. 78 FR 42391 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... for the Jobs Act was the belief that contracting officers and prime contractors are not reporting or... for making false claims. SBA notes that the requirements that apply in the construction arena do not...

  14. Upcoming Purchasing and Subcontracting Opportunities | NREL

    Science.gov Websites

    Services Fall 2022 Construction@nrel.gov Design-Build and Construction Spring 2018 Construction@nrel.gov Design-Build for Minor Construction Spring 2020 Construction@nrel.gov Testing of Fuel and Oil Samples

  15. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  16. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  17. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... which the apparently successful offeror received an evaluation credit for proposing one or more SDB... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  18. 36 CFR 14.9 - Terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... employees of the contractors, and to indemnify the United States against any liability for damages to life..., or national origin and shall require an identical provision to be included in all subcontracts. (l...

  19. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... immediately. In doing so, the contractor shall explain the proposed method of solving the problem or shall... problems and the installation of lines and equipment as contemplated by the contract documents while...

  20. 48 CFR 227.7102-3 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... processes. Do not require the contractor to include this clause in its subcontracts. (2) Use the clause at... for commercial items or commercial components. (c) Use the clause at 252.227-7037, Validation of...

  1. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to complete all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the second quarter (1/1/2013 to 3/31/2013), all the technical and legal documents for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. The revised CRADA documents were sent to DOE, Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for completing legal documents for the project. A non-disclosure agreement was revised and sent to all the parties for reviews.« less

  2. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.« less

  3. Hydrologically-driven crustal stresses and seismicity in the New Madrid Seismic Zone.

    PubMed

    Craig, Timothy J; Chanard, Kristel; Calais, Eric

    2017-12-15

    The degree to which short-term non-tectonic processes, either natural and anthropogenic, influence the occurrence of earthquakes in active tectonic settings or 'stable' plate interiors, remains a subject of debate. Recent work in plate-boundary regions demonstrates the capacity for long-wavelength changes in continental water storage to produce observable surface deformation, induce crustal stresses and modulate seismicity rates. Here we show that a significant variation in the rate of microearthquakes in the intraplate New Madrid Seismic Zone at annual and multi-annual timescales coincides with hydrological loading in the upper Mississippi embayment. We demonstrate that this loading, which results in geodetically observed surface deformation, induces stresses within the lithosphere that, although of small amplitude, modulate the ongoing seismicity of the New Madrid region. Correspondence between surface deformation, hydrological loading and seismicity rates at both annual and multi-annual timescales indicates that seismicity variations are the direct result of elastic stresses induced by the water load.

  4. Model documentation, Coal Market Module of the National Energy Modeling System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report documents the objectives and the conceptual and methodological approach used in the development of the National Energy Modeling System`s (NEMS) Coal Market Module (CMM) used to develop the Annual Energy Outlook 1998 (AEO98). This report catalogues and describes the assumptions, methodology, estimation techniques, and source code of CMM`s two submodules. These are the Coal Production Submodule (CPS) and the Coal Distribution Submodule (CDS). CMM provides annual forecasts of prices, production, and consumption of coal for NEMS. In general, the CDS integrates the supply inputs from the CPS to satisfy demands for coal from exogenous demand models. The internationalmore » area of the CDS forecasts annual world coal trade flows from major supply to major demand regions and provides annual forecasts of US coal exports for input to NEMS. Specifically, the CDS receives minemouth prices produced by the CPS, demand and other exogenous inputs from other NEMS components, and provides delivered coal prices and quantities to the NEMS economic sectors and regions.« less

  5. Supply Constraints Analysis | Energy Analysis | NREL

    Science.gov Websites

    module cost, and future price could be critical to the economic viability of this PV technology. Even constraints on future CdTe PV module deployment and found that: CdTe PV modules can remain cost-competitive and 4070 GW of annual CdTe production by 2030. Cost estimates were based on NREL's manufacturing cost

  6. Bringing together integration technologies in GaAs, InP and Si to deliver low-cost high performance DWDM optoelectronic components and solutions

    NASA Astrophysics Data System (ADS)

    Carter, Andrew C.; Wale, Michael J.; Simmons, T.; Whitbread, Neil; Asghari, M.

    2003-06-01

    A key attribute emerging in the optoelectronic component supply industry is the ability to deliver 'solution level' products rather than discrete optical components to equipment manufacturers. This approach is primarily aimed at reducing cost for the equipment manufacturer both in engineering and assembly. Such 'solutions' must be designed to be cost effective - offering costs substantially below discrete components - and must be compatible with subcontract board manufacture without the traditional and expensive skills of fibre handling, splicing and management. Examples of 'solutions' in this context may be the core of a multifunctional OADM or a DWDM laser transmitter subsystem, with modulation, wavelength and power management all included in a simple to use module. Essential to the cost effective production of such solutions is a high degree of optical/optoelectronic integration. Co-packaging of discrete components and electronics into modules will not deliver the cost reduction demanded. At Bookham Technology we have brought together what we believe to be the three key integration technologies - InP for monolithic tunable sources, GaAs for high performance integrated modulation and ASOC for smart passives and hybrid platforms - which can deliver this cost reduction, together with performance enhancement, over a wide range of applications. In the paper we will demonstrate and compare our above integration approaches with the competing alternatives and seek to show how the power of integration is finally being harnessed in optoelectronics, delivering radical cost reduction as well as enabling system concepts virtually impossible to achieve with discrete components. In the paper we will demonstrate and compare our above integration approaches with the competing alternatives and seek to show how the power of integration is finally being harnessed in optoelectronics, delivering radical cost reduction as well as enabling system concepts virtually impossible to achieve with discrete components.

  7. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  8. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  9. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  10. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  11. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  12. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  13. 48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123...

  14. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  15. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  16. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  17. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  18. 48 CFR 252.225-7046 - Exports by Approved Community Members in Response to the Solicitation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... all applicable International Traffic in Arms Regulations (ITAR) requirements, including any criminal.../Title of Duly Authorized RepresentativeDate (h) Subcontracts. The offeror shall flow down the substance...

  19. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  20. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  1. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  2. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-2... production of an item or process begun as a prototype project under an other transaction agreement or as a...

  3. Atomic-scale characterization of hydrogenated amorphous-silicon films and devices. Annual subcontract report, 14 February 1994--14 April 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallagher, A.; Tanenbaum, D.; Laracuente, A.

    1995-08-01

    Properties of the hydrogenated amorphous silicon (a-Si:H) films used in photovoltaic (PV) panels are reported. The atomic-scale topology of the surface of intrinsic a-Si:H films, measured by scanning tunneling microscopy (STM) as a function of film thickness, are reported and diagnosed. For 1-500-nm-thick films deposited under normal device-quality conditions from silane discharges, most portions of these surfaces are uniformly hilly without indications of void regions. However, the STM images indicate that 2-6-nm silicon particulates are continuously deposited into the growing film from the discharge and fill approximately 0.01% of the film volume. Although the STM data are not sensitive tomore » the local electronic properties near these particulates, it is very likely that the void regions grow around them and have a deleterious effect on a-Si:H photovoltaics. Preliminary observations of particulates in the discharge, based on light scattering, confirm that particulates are present in the discharge and that many collect and agglomerate immediately downstream of the electrodes. Progress toward STM measurements of the electronic properties of cross-sectioned a-Si:H PV cells is also reported.« less

  4. Verify Module for Reporting A/C and Off-Cycle GHG Credits for Light-Duty Vehicle and Truck Manufacturers

    EPA Pesticide Factsheets

    This EPA presentation provides information on using the new Verify module, streamlining the process required to electronically submit annual reporting of air conditioning (A/C) and off-cycle GHG credits for light duty manufacturers.

  5. Final_report_pub1.pdf

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Brien, Nicholas

    2014-08-15

    The paper describes Soitecs project to plan,install,qualify and ramp a high volume CPV module manufactruing facility in Southern California. Soitec’s CPV module factory in San Diego was planned with an annual production capacity of 280MWDC. It was scheduled to be operational by the first quarter of 2013, and was expected to create several hundred direct and indirect jobs in the San Diego region. From ground breaking to facility readiness was completed in six months. This enabled the docking of equipment in the Q3’12 time frame. The first 140 MW of capacity was ready for operation in Q4’12. Production of themore » CX-M500 modules started in Q4 2012. The line yield and factory capacity were ramped in 2013. The annual production capacity demonstration was successfully completed in Q2 2014. The modules manufactured at the plant were used to supply utility scale demand in the US and also world markets.« less

  6. SABRE: WIMP modulation detection in the northern and southern hemisphere

    NASA Astrophysics Data System (ADS)

    Froborg, F.; SABRE Collaboration

    2016-05-01

    Measuring an annual modulation in a direct Dark Matter detection experiment is not only a proof of the existence of WIMPs but can also tell us more about their interaction with standard matter and maybe even their density and velocity in the halo. Such a modulation has been measured by the DAMA/LIBRA experiment in NaI(Tl) crystals. However, the interpretation as WIMP signal is controversial due to contradicting results by other experiments. The SABRE experiment aims to shed light on this controversy by detecting the annual modulation in the same target material as DAMA with twin detectors at LNGS in Italy and at SUPL in Australia. The two locations in the northern and southern hemisphere allow to verify if other seasonal effects or the site have an influence on the measurement, thus reducing systematic effects. This paper will give an overview on the experimental design, the current status of the proof of principle phase mainly devoted to high-purity crystal growing, and an outlook on future plans.

  7. 48 CFR 819.7101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7101 Purpose. The VA Mentor-Protégé Program is... businesses (VOSBs) in enhancing their capabilities to perform contracts and subcontracts for VA. The Mentor...

  8. 48 CFR 2944.302 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...

  9. 48 CFR 2944.302 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...

  10. 48 CFR 2944.302 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...

  11. 75 FR 32723 - Revision of Department of Homeland Security Acquisition Regulation; Limitations on Subcontracting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... terrorism or other man-made disaster. DATES: Comments and related material submitted electronically must be... from a natural disaster or act of terrorism or other man-made disaster. Congress enacted this...

  12. Illinois Institute of Technology Report: IITB52 Antifoamer for Alternative Salt Processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, D.P.

    2001-06-27

    The attached report is a summary of the work performed by Dr. Darsh Wasan, Dr. Alex Nikolov, and their researchers at the Illinois Institute of Technology (IIT) during FY01. IIT developed the IITB52 antifoam for SRTC in FY00 to minimize the foam produced during precipitation, washing and concentration of cesium and potassium tetraphenyl borate precipitate. The IITB52 antifoam has been very successful during continuous processing (prototypical of plant operation). However, there were several key issues where SRTC needed the experience and knowledge of IIT to resolve. As a result a subcontract was set up with Dr. Wasan and Dr. Alexmore » Nikolov during FY01. This subcontract requested IIT to perform the basic research necessary to understand the foaming mechanism and explain the effectiveness of the IITB52 antifoam agent in the Small Tank Tetraphenylborate Process (STTP).« less

  13. The nexus between OSH and subcontracting.

    PubMed

    Nunes, Isabel L

    2012-01-01

    Subcontracting of specialized functions to external companies (e.g. cleaning or maintenance) is actually very common within several industries. These external companies' are called contractors and their contracting is often designated as outsourcing. Frequently contractors involve other companies (the sub-contractors) to assist them in fulfilling the contract, resulting in a complex chain of organizations focused on interchange of work - the contracting chain. Therefore in the same work site can coexist workers form the client-company and workers from the contractors and/or subcontractors. Since contractors perform their job in client's facilities, they can be exposed to hazards that are unknown to them. On other hand, workers of the client company can also be exposed to hazardous situations derived from the work performed by the contractors. The paper discusses how adequate occupational safety and health conditions can be assured when dealing with this kind of dynamic labor networks. Two case-studies and several examples coming from international literature will be presented.

  14. Management of optics. [for HEAO-2 X ray telescope

    NASA Technical Reports Server (NTRS)

    Kirchner, T. E.; Russell, M.

    1981-01-01

    American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

  15. Calculated WIMP signals at the ANDES laboratory: comparison with northern and southern located dark matter detectors

    NASA Astrophysics Data System (ADS)

    Civitarese, O.; Fushimi, K. J.; Mosquera, M. E.

    2016-12-01

    Weakly interacting massive particles (WIMPs) are possible components of the Universe’s dark matter (DM). The detection of WIMPs is signaled by the recoil of the atomic nuclei which form a detector. CoGeNT at the Soudan Underground Laboratory (SUL) and DAMA at the Laboratori Nazionali del Gran Sasso (LNGS) have reported data on annual modulation of signals attributed to WIMPs. Both experiments are located in laboratories in the Northern Hemisphere. DM detectors are planned to operate (or already operate) in laboratories in the Southern Hemisphere, including SABRE at Stawell Underground Physics Laboratory (SUPL) in Australia, and DM-ICE in Antarctica. In this work we have analyzed the dependence of diurnal and annual modulation of signals, pertaining to the detection of WIMP, on the coordinates of the laboratory, for experiments which may be performed in the planned new Agua Negra Deep Experimental Site (ANDES) underground facility, to be built in San Juan, Argentina. We made predictions for NaI and Ge-type detectors placed in ANDES, to compare with DAMA, CoGeNT, SABRE and DM-ICE arrays, and found that the diurnal modulation of the signals, at the ANDES site, is amplified at its maximum value, both for NaI (Ge)-type detectors, while the annual modulation remains unaffected by the change in coordinates from north to south.

  16. Equatorial Annual Oscillation with QBO-driven 5-year Modulation in NCEP Data

    NASA Technical Reports Server (NTRS)

    Mayr, H. G.; Mengel, J. G.; Huang, F. T.; Nash, E. R.

    2007-01-01

    An analysis is presented of the zonal wind and temperature variations supplied by the National Center for Environmental Prediction (NCEP), which have been assimilated in the Reanalysis and the Climate Prediction Center (CCP) data sets. The derived zonal-mean variations are employed. Stimulated by modeling studies, the data are separated into the hemispherically symmetric and anti-symmetric components, and spectral analysis is applied to study the annual 12-month oscillation and Quasi-biennial Oscillation (QBO). For data samples that cover as much as 40 years, the results reveal a pronounced 5-year modulation of the symmetric AO in the lower stratosphere, which is confined to equatorial latitudes. This modulation is also inferred for the temperature variations but extends to high latitudes, qualitatively consistent with published model results. A comparison between different data samples indicates that the signature of the 5-year oscillation is larger when the QBO of 30 months is more pronounced. Thus there is circumstantial evidence that this periodicity of the QBO is involved in generating the oscillation. The spectral analysis shows that there is a weak anti-symmetric 5-year oscillation in the zonal winds, which could interact with the large antisymmetric A0 to produce the modulation of the symmetric AO as was shown in earlier modeling studies. According to these studies, the 30-month QBO tends to be synchronized by the equatorial Semi-annual Oscillation (SAO), and this would explain why the inferred 5-year modulation is observed to persist and is phase locked over several cycles.

  17. Who is working while sick? Nonstandard employment and its association with absenteeism and presenteeism in South Korea.

    PubMed

    Kim, Ja Young; Lee, Joohee; Muntaner, Carles; Kim, Seung-Sup

    2016-10-01

    This study sought to examine whether nonstandard employment is associated with presenteeism as well as absenteeism among full-time employees in South Korea. We analyzed a cross-sectional survey of 26,611 full-time employees from the third wave of the Korean Working Conditions Survey in 2011. Experience of absenteeism and presenteeism during the past 12 months was assessed through self-reports. Employment condition was classified into six categories based on two contract types (parent firm and subcontract) and three contract durations [permanent (≥1 year, no fixed term), long term (≥1 year, fixed term), and short term (<1 year, fixed term)]. We found opposite trends between the association of nonstandard employment with absenteeism and presenteeism after adjusting for covariates. Compared to parent firm-permanent employment, which has been often regarded as a standard employment, absenteeism was not associated or negatively associated with all nonstandard employment conditions except parent firm-long term employment (OR 1.88; 95 % CI 1.57, 2.26). However, presenteeism was positively associated with parent firm-long term (OR 1.64; 95 % CI 1.42, 1.91), subcontract-long term (OR 1.61; 95 % CI 1.12, 2.32), and subcontract-short term (OR 1.26; 95 % CI 1.02, 1.56) employment. Our results found that most nonstandard employment may increase risk of presenteeism, but not absenteeism. These results suggest that previous findings about the protective effects of nonstandard employment on absenteeism may be explained by nonstandard workers being forced to work when sick.

  18. Scientific Data Analysis and Software Support: Geodynamics

    NASA Technical Reports Server (NTRS)

    Klosko, Steven; Sanchez, B. (Technical Monitor)

    2000-01-01

    The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.

  19. Subcontractors and increased risk for work-related diseases and absenteeism.

    PubMed

    Min, Kyoung B; Park, Shin G; Song, Jae S; Yi, Kwan H; Jang, Tae W; Min, Jin Y

    2013-11-01

    Despite increasing reliance on subcontracting in many economic sectors, there is little information available on occupational health and safety issues among subcontractor employees. The purpose of this study was to investigate the effect of subcontracting on self-reported health problems and absences due to occupational accidents and sickness using a nationally representative sample from South Korea. The data used were sampled from the second wave of the Korean Working Conditions Survey [2010]. Information on 3,282 parent firm employees and 728 subcontractor employees was obtained. For the logistic regression model, the outcomes were work-related health problems and absenteeism. The independent variables were personal and occupational characteristics, job aspects, and working hazards. Subcontractor employees were significantly more likely to experience health problems than the employee at parent firms. In particular, subcontractors' risk of injuries and anxiety/depression increased twofold (odd ratios, OR=2.01, 95% confidence interval, CIs, 1.24-3.26) and threefold (OR=2.95, 95% CIs 1.52-5.73), respectively, after controlling for potential variables. In addition, subcontractor employees were three times more likely than employees at parent firms to miss work due to illness (OR=3.56; 95% CIs 2.02-6.26). Working conditions, especially those related to job aspects and workplace exposures, attenuated these risks. Subcontracting workers were found to have a higher risk of work-related diseases and a higher absenteeism rate than parent firm workers. Our study highlights the need to protect and improve the occupational health and safety of subcontractor employees. Copyright © 2013 Wiley Periodicals, Inc.

  20. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  1. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  2. 48 CFR 44.302 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Requirements. 44.302 Section 44.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.302 Requirements. (a) The ACO...

  3. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  4. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  5. 48 CFR 1344.302 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Requirements. 1344.302 Section 1344.302 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews § 1344.302 Requirements. The...

  6. 48 CFR 44.302 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Requirements. 44.302 Section 44.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.302 Requirements. (a) The ACO...

  7. 48 CFR 644.302 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...

  8. 20 CFR 632.35 - Native American grantee contracts and subgrants.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... contract or subgrant shall be given to qualified Indians regardless of age, religion or sex and that the... paragraph in all subcontracts and subgrants made by them (sec. 7(b) of the Indian Self-Determination and...

  9. 20 CFR 632.35 - Native American grantee contracts and subgrants.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... contract or subgrant shall be given to qualified Indians regardless of age, religion or sex and that the... paragraph in all subcontracts and subgrants made by them (sec. 7(b) of the Indian Self-Determination and...

  10. 48 CFR 2144.102 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...

  11. 48 CFR 2144.102 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...

  12. 48 CFR 2144.102 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...

  13. 48 CFR 370.202 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 370.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES HHS SUPPLEMENTATIONS SPECIAL PROGRAMS AFFECTING ACQUISITION Indian Preference in Employment, Training, and Subcontracting... with Indian organizations; or (2) The work to be performed is specifically for the benefit of Indians...

  14. 48 CFR 370.205 - Tribal preference requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirements. 370.205 Section 370.205 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES HHS SUPPLEMENTATIONS SPECIAL PROGRAMS AFFECTING ACQUISITION Indian Preference in Employment, Training, and Subcontracting Opportunities 370.205 Tribal preference requirements. (a) When the contractor will perform work...

  15. 48 CFR 1419.705-6 - Postaward responsibilities of the contracting officer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting program. Reviews shall be conducted as required based on problems perceived such as insufficient... format shown at 1453.303-70. At the discretion of the CO, the BUDS may conduct the reviews. In addition...

  16. 48 CFR 19.705-2 - Determining the need for a subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance of part of the work or maintain sufficient in-house capability to perform the work; (2) Whether... business, and women-owned small business concerns to participate, and the burden placed on offerors. (e) A...

  17. 48 CFR 19.705-2 - Determining the need for a subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performance of part of the work or maintain sufficient in-house capability to perform the work; (2) Whether... business, and women-owned small business concerns to participate, and the burden placed on offerors. (e) A...

  18. 20 CFR 632.35 - Native American grantee contracts and subgrants.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... paragraph in all subcontracts and subgrants made by them (sec. 7(b) of the Indian Self-Determination and... contract or subgrant shall be given to qualified Indians regardless of age, religion or sex and that the...

  19. 78 FR 40175 - Agency Information Collection Activities; Proposed New Collection; Comments Requested: Police-Led...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... Uniform Crime Reporting. CCI will subcontract with a professional survey research firm to administer the survey. (5) An estimate of the total number of respondents and the amount of time estimated for an...

  20. 48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (TAS) as reported in FPDS. (xiv) The applicable North American Industry Classification System code... filings at http://www.sec.gov/answers/execomp.htm.) (e) The Contractor shall not split or break down first...

Top