SIG Galileo final converter technical summary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hinderman, J.D.
1979-05-01
The report is primarily concerned with the work performed for DOE on converter development and fabrication for the NASA Galileo Jupiter mission as a DOE prime contractor with interface primarily with Teledyne Energy Systems. The activities reported on were directed toward design, analysis and testing of modules and converters SN-1 thru SN-7 and attendant Quality Control and Reliability effort. Although assembly and testing of SN-1 was not accomplished due to the stop work order, the design was virtually completed and a significant amount of subcontracting and manufacturing of both module and converter components was underway. These subcontracting and manufacturing activitiesmore » were selectively closed down depending upon degree of completion and material or hardware potential usage in the Technology Program.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandwisch, D. W.
1999-09-02
This report describes work performed by Solar Cells, Inc. (SCI), during this Photovoltaic Manufacturing Technology (PVMaT) subcontract. Cadmium telluride (CdTe) is recognized as one of the leading materials for low-cost photovoltaic modules. SCI has developed this technology and is preparing to scale its pilot production capabilities to a multi-megawatt level. This four-phase PVMaT subcontract supports these efforts. The work was related to product definition, process definition, equipment engineering, and support programs development. In the area of product definition and demonstration, two products were specified and demonstrated-a grid-connected, frameless, high-voltage product that incorporates a pigtail potting design and a remote low-voltagemore » product that may be framed and may incorporate a junction box. SCI produced a 60.3-W thin-film CdTe module with total-area efficiency of 8.4%; SCI also improved module pass rate on the interim qualification test protocol from less than 20% to 100% as a result of work related to the subcontract. In the manufacturing process definition area, the multi-megawatt manufacturing process was defined, several of the key processes were demonstrated, and the process was refined and proven on a 100-kW pilot line that now operates as a 250-kW line. In the area of multi-megawatt manufacturing-line conceptual design review, SCI completed a conceptual layout of the multi-megawatt lines. The layout models the manufacturing line and predicts manufacturing costs. SCI projected an optimized capacity, two-shift/day operation of greater than 25 MW at a manufacturing cost of below $1.00/W.« less
Final Report: Sintered CZTS Nanoparticle Solar Cells on Metal Foil; July 26, 2011 - July 25, 2012
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leidholm, C.; Hotz, C.; Breeze, A.
2012-09-01
This is the final report covering 12 months of this subcontract for research on high-efficiency copper zinc tin sulfide (CZTS)-based thin-film solar cells on flexible metal foil. Each of the first three quarters of the subcontract has been detailed in quarterly reports. In this final report highlights of the first three quarters will be provided and details will be given of the final quarter of the subcontract.
Final Report for PV Incubator Subcontract No. NAT-0-99013-01: June 14, 2010 - March 2, 2012
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ghosal, K.
2012-04-01
The goal of the subcontract is to scale up Semprius' novel micro-cell based modules to an annualized rate of 500 kW of receivers and 10 kW of modules, in support of the DOE 2020 Sunshot Initiative goals. The statement of work (SOW) was broken up into two Phases. Phase I was directed towards process development efforts towards addressing fundamental manufacturing metrics such as yield, die per wafer, automation and throughput. Phase II objectives are to scale to an annualized production rate of 500 kW of receivers and 10 kW of modules, while improving cell efficiency, module efficiency and transfer yield.more » Semprius has met all the technical milestones and deliverables for the contract. All subtasks were completed earlier than expected and the results exceeded the technical targets. In particular, 3J cell efficiency of 41.2% exceeded the target of 38%, module efficiency of 28.3% exceeded the target of 28% and transfer yield of 96.4% exceeds the target of 95%, with all tasks completed well ahead of schedule. Also, devices fabricated from 1st use GaAs substrates and substrates with two re-uses have been shown to be identical.« less
1990-12-03
This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.
NREL Photovoltaic Program FY 1995 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-06-01
This report summarizes the in-house and subcontracted R&D activities from Oct. 1994 through Sept. 1995; their objectives are to conduct basic, applied, and engineering research, manage subcontracted R&D projects, perform research complementary to subcontracted work, develop and maintain state-of-the-art measurement and device capabilities, develop PV manufacturing technology and modules, transfer results to industry, and evolve viable partnerships for PV systems and market development. The research activities are grouped into 5 sections: crystalline Si and advanced devices, thin-film PV, PV manufacturing, PV module and system performance and engineering, and PV applications and market development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandwisch, D.W.
1997-02-01
The objectives of this subcontract are to advance Solar Cells, Inc.`s (SCI`s) photovoltaic manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. Activities during the second year of the program concentrated on process development, equipment design and testing, quality assurance, and ES and H programs. These efforts broadly addressed the issues of the manufacturing process for producing thin-film monolithic CdS/CdTe photovoltaic modules.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandwisch, D W
1995-11-01
This report describes work performed by Solar Cells, Inc. (SCI), under a 3-year subcontract to advance SCI`s PV manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. SCI will meet these objectives in three phases by designing, debugging, and operating a 20-MW/year, automated, continuous PV manufacturing line that produces 60-cm {times} 120-cm thin-film CdTe PV modules. This report describes tasks completed under Phase 1 of the US Department of Energy`s PV Manufacturing Technology program.
Apollo(R) Thin Film Process Development: Final Technical Report, April 1998 - April 2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cunningham, D.W.
2002-10-01
BP Solar first started investigative work on CdTe photovoltaics in 1986. The module product name chosen for the CdTe devices is Apollo. The deposition method chosen was electrochemical deposition due to its simplicity and good control of stoichiometric composition. The window layer used is CdS, produced from a chemical-bath deposition. Initial work focused on increasing photovoltaic cell size from a few mm2 to 900 cm2. At BP Solar's Fairfield plant, work is focused on increasing semiconductor deposition to 1 m2. The primary objective of this subcontract is to establish the conditions required for the efficient plating of CdS/CdTe on large-area,more » transparent conducting tin-oxide-coated glass superstrate. The initial phase concentrates on superstrate sizes up to 0.55 m2. Later phases will include work on 0.94 m2 superstrates. The tasks in this subcontract have been split into four main categories: (1) CdS and CdTe film studies; (2) Enhanced laser processing; (3) Outdoor testing program for the Apollo module; and (4) Production waste abatement and closed loop study.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... Contracts 227.304-1 General. Interim and final invention reports and notification of all subcontracts for... of Inventions and Subcontracts. [56 FR 36389, July 31, 1991, as amended at 57 FR 53600, Nov. 12, 1992] ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saifee, T.; Konnerth, A. III
1991-11-01
Solar Kinetics, Inc. (SKI) has been developing point-focus concentrating PV modules since 1986. SKI is currently in position to manufacture between 200 to 600 kilowatts annually of the current design by a combination of manual and semi-automated methods. This report reviews the current status of module manufacture and specifies the required approach to achieve a high-volume manufacturing capability and low cost. The approach taken will include process development concurrent with module design for automated manufacturing. The current effort reviews the major manufacturing costs and identifies components and processes whose improvements would produce the greatest effect on manufacturability and cost reduction.more » The Fresnel lens is one such key component. Investigating specific alternative manufacturing methods and sources has substantially reduced the lens costs and has exceeded the DOE cost-reduction goals. 15 refs.« less
Evaluation of Subcontract Price Proposals
1990-04-09
This is the final report on the Audit of the Evaluation of Subcontract Price Proposals. Comments on a draft of this report were considered in...preparing the final report. We made the audit from October 1987 through May 198% The initial objectives of the audit were to evaluate procedures used by...assist audit reports were used by procurement contracting officers in negotiating contract prices. During the audit , we expanded our objectives to
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holley, W A
This report describes work performed under a subcontract to the National Renewable Energy Laboratory under the Photovoltaic Manufacturing Technology Project. The objectives of this subcontract are to (1) define the problem of yellowing/browning of EVA-based encapsulants; (2) determine probable mechanisms and the role of various parameters such as heat, UV exposure, module construction, EVA interfaces, and EVA thickness, in the browning of EVA-based encapsulants; (3) develop stabilization strategies for various module constructions to protect the encapsulant from degradative failure; (4) conduct laboratory, accelerated outdoor, and field testing of encapsulant, laminated test coupons, and full modules to demonstrate the functional adequacymore » of the stabilization strategies; and (5) implement these strategies. This report summarizes the accomplishments related to the above goals for the reporting period.« less
The Photovolatic Manufacturing Technology project (PVMaT) after three years
NASA Astrophysics Data System (ADS)
Witt, C. Edwin; Mitchell, Richard L.; Thomas, Holly; Herwig, Lloyd O.
1994-08-01
The Photovoltaic Manufacturing Technology project (PVMaT) is a government/industry research and development (R&D) partnership involving joint efforts between the federal government (through the US Department of Energy (DOE)) and members of the US photovoltaic (PV) industry. The project's goal is to assist US industry in retaining and extending its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is being carried out in three separate phases, each designed to address separate R&D requirements for achieving PVMaT goals. Phase 1 was a problem identification phase of about 3 months duration. In Phase 1, the status and needs of the US PV manufacturing industry were identified, and the development of a Phase 2 procurement responsive to the industry's needs was begun. Phase 1 was completed in 1991. Problem solution began in 1992, under Phase 2A, when DOE awarded multiyear subcontracts. Technical accomplishments for PVMaT 2A are presented in this paper. Subcontracts were recently awarded for a second, overlapping, and similar process-specific solicitation (PVMaT 2B). The activities of these new subcontracts are also described. Two subcontracts presently comprise the Phase 3 effort. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. A teamed research approach is being used to improve automated module manufacturing lines and encapsulation materials used in module manufacturing. The first year's work on these subcontracts is also described in this paper.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oswald, R.; Morris, J.
1994-11-01
The objective of this subcontract over its three-year duration is to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance and expand the Solarex commercial production capacity. Solarex shall meet these objectives by improving the deposition and quality of the transparent front contact, by optimizing the laser patterning process, scaling-up the semiconductor deposition process, improving the back contact deposition, scaling-up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 2 portion of this subcontract, Solarex focused on improving deposition of the front contact, investigating alternate feed stocks for the front contact,more » maximizing throughput and area utilization for all laser scribes, optimizing a-Si:H deposition equipment to achieve uniform deposition over large-areas, optimizing the triple-junction module fabrication process, evaluating the materials to deposit the rear contact, and optimizing the combination of isolation scribe and encapsulant to pass the wet high potential test. Progress is reported on the following: Front contact development; Laser scribe process development; Amorphous silicon based semiconductor deposition; Rear contact deposition process; Frit/bus/wire/frame; Materials handling; and Environmental test, yield and performance analysis.« less
Photovoltaic Subcontract Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surek, Thomas; Catalano, Anthony
1993-03-01
This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less
Photovoltaic Subcontract Program. Annual report, FY 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-03-01
This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less
2005-06-01
The Office of Personnel Management (OPM) is issuing this final regulation to amend the Federal Employees Health Benefits Acquisition Regulation (FEHBAR). It establishes requirements, including audit, for Federal Employees Health Benefits Program (FEHB) experience-rated carriers' Large Provider Agreements. It also modifies the dollar threshold for review of carriers' subcontract agreements; revises the definitions of Cost or Pricing Data and Experience-rate to reflect mental health parity requirements; updates the contract records retention requirement; updates the FEHB Clause Matrix; and conforms subpart and paragraph references to Federal Acquisition Regulation (FAR) revisions made since we last updated the FEHBAR.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mason, T. O.; Chang, R. P. H.; Marks, T. J.
2003-10-01
This subcontract focused on next-generation transparent conducting oxides (TCOs) for improved PV performance. More specifically, there were two research foci: (1) improved Sn-based, n-type TCOs aimed at enhanced CdTe PV cell performance, and (2) novel Cu-based, p-type TCOs applicable to a variety of PV designs. The objective of the research under this subcontract was to identify, explore, evaluate, and develop future generations of photovoltaic technologies that can meet the long-term goal of producing low-cost electricity from sunlight.
Black liquor gasification phase 2D final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kohl, A.L.; Stewart, A.E.
1988-06-01
This report covers work conducted by Rockwell International under Amendment 5 to Subcontract STR/DOE-12 of Cooperative Agreement DE-AC-05-80CS40341 between St. Regis Corporation (now Champion International) and the Department of Energy (DOE). The work has been designated Phase 2D of the overall program to differentiate it from prior work under the same subcontract. The overall program is aimed at demonstrating the feasibility of and providing design data for the Rockwell process for gasifying Kraft black liquor. In this process, concentrated black liquor is converted into low-Btu fuel gas and reduced melt by reaction with air in a specially designed gasification reactor.
The Grid Analysis and Display System (GrADS)
NASA Technical Reports Server (NTRS)
Kinter, James L., III
1994-01-01
During the period 1 September 1993 - 31 August 1994, further development of the Grid Analysis and Display System (GrADS) was conducted at the Center for Ocean-Land-Atmosphere Studies (COLA) of the Institute of Global Environment and Society, Inc. (IGES) under subcontract 5555-31 from the University Space Research Association (USRA) administered by The Center of Excellence in Space Data and Information Sciences (CESDIS). This final report documents progress made under this subcontract and provides directions on how to access the software and documentation developed therein. A short description of GrADS is provided followed by summary of progress completed and a summary of the distribution of the software to date and the establishment of research collaborations.
DOT National Transportation Integrated Search
2016-08-01
This document describes the process and status of developing and implementing agreements, contracts and subcontracts among partner organizations in the New York City Connected Vehicle Pilot Deployment (NYC CVPD). Details include the work elements as ...
Final Technical Report for subcontract number B612144
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mayali, X.; Marcu, O.
The original statement of work stipulated that the Subcontractor shall perform bacterial and algal cultivation and manipulation, microbe isolation, preparation of samples for sequencing and isotopic analysis, data analysis, and manuscript preparation. The Subcontractor shall work closely with Dr. Mayali and other LLNL scientists, and shall participate in monthly SFA meetings (either in person or by telephone). The Subcontractor shall deliver a final report at the conclusion of the work.
NREL Photovoltaic Program. FY 1994 annual report, October 1, 1993--September 30, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-06-01
This report summarizes the in-house and subcontracted research and development activities under the National renewable Energy Laboratory (NREL) Photovoltaics (PV) program for fiscal year 1994. Research is organized under the following areas; PV program management; crystalline silicon and advanced devices; thin-film PV technologies; PV manufacturing; PV module and system performance and engineering; and PV applications and markets.
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND... notify the Contracting officer in writing at least 30 days in advance of entering into any subcontract or...
Annual Report: Photovoltaic Subcontract Program FY 1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Summers, K. A.
1991-03-01
This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less
NFIRAOS in 2015: engineering for future integration of complex subsystems
NASA Astrophysics Data System (ADS)
Atwood, Jenny; Andersen, David; Byrnes, Peter; Densmore, Adam; Fitzsimmons, Joeleff; Herriot, Glen; Hill, Alexis
2016-07-01
The Narrow Field InfraRed Adaptive Optics System (NFIRAOS) will be the first-light facility Adaptive Optics (AO) system for the Thirty Meter Telescope (TMT). NFIRAOS will be able to host three science instruments that can take advantage of this high performance system. NRC Herzberg is leading the design effort for this critical TMT subsystem. As part of the final design phase of NFIRAOS, we have identified multiple subsystems to be sub-contracted to Canadian industry. The scope of work for each subcontract is guided by the NFIRAOS Work Breakdown Structure (WBS) and is divided into two phases: the completion of the final design and the fabrication, assembly and delivery of the final product. Integration of the subsystems at NRC will require a detailed understanding of the interfaces between the subsystems, and this work has begun by defining the interface physical characteristics, stability, local coordinate systems, and alignment features. In order to maintain our stringent performance requirements, the interface parameters for each subsystem are captured in multiple performance budgets, which allow a bottom-up error estimate. In this paper we discuss our approach for defining the interfaces in a consistent manner and present an example error budget that is influenced by multiple subsystems.
48 CFR 836.574 - Subcontracts and work coordination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracts and work... Subcontracts and work coordination. The contracting officer shall insert the clause at 852.236-80, Subcontracts and work coordination, in solicitations and contracts for construction expected to exceed the micro...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 1052.219-71 - Subcontracting Plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services. >
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Subcontracting for nuclear... Clauses 952.225-70 Subcontracting for nuclear hot cell services.> As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
DOT National Transportation Integrated Search
2009-03-20
This report was prepared by ECRI Institute under subcontract to MANILA Consulting Group, Inc., which holds prime GS-10F-0177N/DTMC75-06-F-00039 with the Department of Transportations Federal Motor Carrier Safety Administration. ECRI Institute is a...
48 CFR 2152.244-70 - Subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract... consideration controlling establishment of initial or revised prices; (iii) The reason cost or pricing data were... subcontractor's cost or pricing data in determining the price objective and in negotiating the final price; (v...
Improvements in Cz silicon PV module manufacturing
NASA Astrophysics Data System (ADS)
King, Richard R.; Mitchell, Kim W.; Jester, Theresa L.
1997-02-01
Work focused on reducing the cost per watt of Cz Si photovoltaic modules under Phase I of Siemens Solar Industries' DOE/NREL PVMaT 4A subcontract is described. Module cost components are analyzed and solutions to high-cost items are discussed in terms of specific module designs. The approaches of using larger cells and modules to reduce per-part processing cost, and of minimizing yield loss are particularly leveraging. Yield components for various parts of the fabrication process and various types of defects are shown, and measurements of the force required to break wafers throughout the cell fabrication sequence are given. The most significant type of yield loss is mechanical breakage. The implementation of statistical process control on key manufacturing processes at Siemens Solar Industries is described. Module configurations prototyped during Phase I of this project and scheduled to begin production in Phase II have a projected cost per watt reduction of 19%.
ARTIST CONCEPT - APOLLO XI - LUNAR SURFACE
1969-07-11
S69-39011 (July 1969) --- TRW Incorporated's artist concept depicting the Apollo 11 Lunar Module (LM) descending to the surface of the moon. Inside the LM will be astronauts Neil A. Armstrong, commander, and Edwin E. Aldrin Jr., lunar module pilot. Astronaut Michael Collins, command module pilot, will remain with the Command and Service Modules (CSM) in lunar orbit. TRW's LM descent engine will brake Apollo 11's descent to the lunar surface. The throttle-able rocket engine will be fired continuously the last 10 miles of the journey to the moon, slowing the LM to a speed of two miles per hour at touchdown. TRW Incorporated designed and built the unique engine at Redondo Beach, California under subcontract to the Grumman Aircraft Engineering Corporation, Bethpage, New York, the LM prime contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 3 2010-10-01 2010-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 3 2013-10-01 2013-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 3 2011-10-01 2011-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 3 2014-10-01 2014-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
Interface definition for the Far Ultraviolet Spectrometer Experiment S169
NASA Technical Reports Server (NTRS)
Fastie, W. G.
1971-01-01
A final contract for development, fabrication, test and flight of the ultraviolet spectrometer experiment on an Apollo space mission is reported. Two interface control documents were completed and signed off and three more were essentially completed. Supporting preliminary concepts formulation, design study and component investigation, specification and subcontract negotiation were accomplished.
Automated System for Aneuploidy Detection in Sperm Final Report CRADA No. TC-1364-96: Phase I SBIR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wyrobek, A. J.; Dunlay, R. T.
This project was a relationship between Lawrence Livermore National Laboratory (LLNL) and Biological Detection, Inc. (now known as Cellomics, Inc.) It was funded as a Phase I SBIR from the National Institutes of Health (NIH) awarded to Cellomics, Inc. with a subcontract to LLNL.
Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-05-01
This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ames, J.; Werner, C.
2003-08-01
Final report on subcontract for holding two briefings for policymakers and the environmental community on environmental issues related to biofuels; one on one on the energy and environmental issues associated with biofuels production and use, and the other on implications of pending renewable fuels standard legislation.
Economic Value of Army Foreign Military Sales
2015-12-01
12 2. Direct Commercial Sales vs. Foreign Military Sales .....................15 3...the final bill to the customer, and the DSCA sends a closure certificate to DFAS. 2. Direct Commercial Sales vs. Foreign Military Sales Direct ...is defined as the “coproduction, licensed production, countertrade, subcontracting, and technology transfer—mandated by foreign governments as a
48 CFR 2019.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705-4 Reviewing the subcontracting plan...
NASA Astrophysics Data System (ADS)
Carter, Andrew C.; Wale, Michael J.; Simmons, T.; Whitbread, Neil; Asghari, M.
2003-06-01
A key attribute emerging in the optoelectronic component supply industry is the ability to deliver 'solution level' products rather than discrete optical components to equipment manufacturers. This approach is primarily aimed at reducing cost for the equipment manufacturer both in engineering and assembly. Such 'solutions' must be designed to be cost effective - offering costs substantially below discrete components - and must be compatible with subcontract board manufacture without the traditional and expensive skills of fibre handling, splicing and management. Examples of 'solutions' in this context may be the core of a multifunctional OADM or a DWDM laser transmitter subsystem, with modulation, wavelength and power management all included in a simple to use module. Essential to the cost effective production of such solutions is a high degree of optical/optoelectronic integration. Co-packaging of discrete components and electronics into modules will not deliver the cost reduction demanded. At Bookham Technology we have brought together what we believe to be the three key integration technologies - InP for monolithic tunable sources, GaAs for high performance integrated modulation and ASOC for smart passives and hybrid platforms - which can deliver this cost reduction, together with performance enhancement, over a wide range of applications. In the paper we will demonstrate and compare our above integration approaches with the competing alternatives and seek to show how the power of integration is finally being harnessed in optoelectronics, delivering radical cost reduction as well as enabling system concepts virtually impossible to achieve with discrete components. In the paper we will demonstrate and compare our above integration approaches with the competing alternatives and seek to show how the power of integration is finally being harnessed in optoelectronics, delivering radical cost reduction as well as enabling system concepts virtually impossible to achieve with discrete components.
48 CFR 30.607 - Subcontract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...
, administration, and placement of subcontracts for both centers, ensuring that the objectives are met and that the develop budgets for subcontracts and makes sure the subcontracts are properly initiated and closed out in
[Development of an Occupational Training Center for the Mentally Retarded.] Final Project Report.
ERIC Educational Resources Information Center
Hastbacka, Edwin A.
The Occupational Training Center prepared mentally retarded young adults (over age 15, IQ range 30 to 70, average IQ 55) who were beyond regular schooling for competitive employment. The training program consisted of 60 to 90 mentally and multiply handicapped students per year (35 at a time) and used subcontracts from local businesses. The…
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 30.607 - Subcontract administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontract administration. 30.607 Section 30.607 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract...
Solar electric thermal hydronic (SETH) product development project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stickney, B.L.; Sindelar, A.
Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and developmentmore » of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.« less
48 CFR 219.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business firms specifically identified in the subcontracting plan. Notifications shall be in writing and... SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business... business concerns shall include subcontracts with historically black colleges and universities and minority...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalejs, J.P.
1994-06-01
Mobil Solar Energy Corporation manufactures photovoltaic modules based on its unique Edge-defined Film-fed Growth (EFG) process for producing octagon-shaped hollow polycrystalline silicon tubes. The octagons are cut by lasers into 100 mm x 100 mm wafers which are suitable for solar cell processing. This process avoids slicing, grinding and polishing operations which are wasteful of material and are typical of most other wafer production methods. EFG wafers are fabricated into solar cells and modules using processes that have been specially developed to allow scaling up to high throughput rates. The goals of the Photovoltaic Manufacturing Technology Initiative (PVMaT) program atmore » Mobil Solar were to improve the EFG manufacturing line through technology advances that accelerate cost reduction in production and stimulate market growth for its product. The program was structured into three main tasks: to decrease silicon utilization by lowering wafer thickness from 400 to 200 {mu}m; to enhance laser cutting yields and throughput while improving the wafer strength; and to raise crystal growth productivity and yield. The technical problems faced and the advances made in the Mobil Solar PVMaT program are described. The author concludes with a presentation of the results of a detailed cost model for EFT module production. This model describes the accelerated reductions in manufacturing costs which are already in place and the future benefits anticipated to result from the technical achievements of the PVMaT program.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...
78 FR 59798 - Small Business Subcontracting: Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 125 RIN 3245-AG22 Small Business Subcontracting: Correction AGENCY: U.S. Small Business Administration. ACTION: Correcting amendments. SUMMARY: This document... business subcontracting to implement provisions of the Small Business Jobs Act of 2010. This correction...
14 CFR 1274.510 - Subcontracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...
14 CFR 1274.510 - Subcontracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 49.108 - Settlement of subcontract settlement proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement of subcontract settlement proposals. 49.108 Section 49.108 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108 Settlement of subcontract...
48 CFR 1519.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
1990-01-01
This report presents a variety of subcontract data collected from Department of Defense (DOD) large business firms that have received at least one...award in excess of $500,000 ($1,000,000 for construction). Public Law 95-507 requires that these contractors establish a small business and small...disadvantaged business subcontracting program and report to DOD quarterly, using Standard Form 295, on subcontract awards made to these types of firms
48 CFR 970.1907-1 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-24
... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...
13 CFR 126.701 - Can these subcontracting percentages requirements change?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Can these subcontracting percentages requirements change? 126.701 Section 126.701 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.701 Can these subcontracting percentages...
48 CFR 49.606 - Granting subcontract settlement authorization.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-furnished material or articles completed but undelivered under the subcontract or purchase order, as these... articles may be disposed of without Government approval or screening if the total amount (at subcontract... retention or other disposal of termination inventory allocated to the settlement proposal. (ii) Deduct...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 35.009 - Subcontracting research and development effort.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.009 Subcontracting research and development effort. Since the selection of R&D contractors is substantially based on... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontracting research...
Development of vehicle magnetic air conditioner (VMAC) technology. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gschneidner, Karl A., Jr.; Pecharsky, V.K.; Jiles, David
2001-08-28
The objective of Phase I was to explore the feasibility of the development of a new solid state refrigeration technology - magnetic refrigeration - in order to reduce power consumption of a vehicle air conditioner by 30%. The feasibility study was performed at Iowa State University (ISU) together with Astronautics Corporation of America Technology Center (ACATC), Madison, WI, through a subcontract with ISU.
48 CFR 215.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontract pricing considerations. 215.404-3 Section 215.404-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contract Pricing 215.404-3 Subcontract pricing considerations. Follow the procedures at PGI 215.404-3 when...
76 FR 61626 - Small Business Subcontracting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-05
... SMALL BUSINESS ADMINISTRATION 13 CFR Parts 121 and 125 RIN 3245-AG22 Small Business Subcontracting AGENCY: U.S. Small Business Administration. ACTION: Proposed rule. SUMMARY: The U.S. Small Business... Business Jobs Act of 2010, which pertain to small business subcontracting. SBA is proposing to amend its...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 970.5236-1 - Government facility subcontract approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...
48 CFR 970.5236-1 - Government facility subcontract approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...
48 CFR 970.5236-1 - Government facility subcontract approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 2452.219-74 - Small business subcontracting goals.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...
48 CFR 2452.219-74 - Small business subcontracting goals.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 31.204 - Application of principles and procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-price subcontract with economic price adjustment provisions. (c) Costs incurred as payments under firm-fixed-price subcontracts or fixed-price subcontracts with economic price adjustment provisions or... captures the essential nature of, the cost at issue. [48 FR 42301, Sept. 19, 1983, as amended at 53 FR...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Small business... Clauses 52.219-9 Small business subcontracting plan. As prescribed in 19.708(b), insert the following clause: Small Business Subcontracting Plan (OCT 2010) (a) This clause does not apply to small business...
25 CFR 276.16 - Subgrants and subcontracts to non-profit organizations.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Subgrants and subcontracts to non-profit organizations. 276.16 Section 276.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF... Subgrants and subcontracts to non-profit organizations. The uniform administrative requirements in this part...
1995-01-01
disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has a section for each of the...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and disadvantaged businesses. The
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... hot cell services. 952.225-70 Section 952.225-70 Federal Acquisition Regulations System DEPARTMENT OF....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...
48 CFR 1852.219-73 - Small business subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...
78 FR 17671 - Federal Acquisition Regulation; Submission for OMB Review; Summary Subcontract Report
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for... for DOD and NASA) of subcontracts awarded by prime and subcontractors for a specific Federal... data from Alaskan Native Corporations and Indian Tribe concerns under a subcontracting plan with the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 3 2012-10-01 2012-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use...
48 CFR 1852.219-73 - Small business subcontracting plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...
48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...
48 CFR 1852.219-73 - Small business subcontracting plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...
48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...
48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...
48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...
48 CFR 1852.219-73 - Small business subcontracting plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...
48 CFR 1852.219-73 - Small business subcontracting plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holley, W H
This report describes the results of the literature search, interviews, and site visits conducted during the first six months of this subcontract. This survey was conducted to establish a baseline of information about thermal and photothermal degradation of EVA and case history surveys on discoloration (yellowing/browning) of EVA-based encapsulants in fielded flat-plate PV modules. The literature search revealed that EVA will undergo thermolysis of the acetate groups at temperatures of 130{degrees}C to 150{degrees}C and above, leading to formation of double bonds in the backbone of the copolymer. The survey of case histories of EVA-based encapsulant discoloration in fielded modules inmore » the United States revealed that the problem is limited to those areas of the west and southwest that have comparatively high solar insolation and ambient temperature. It is clear that the discoloration problem is not limited to the modules of any one manufacturer. Discoloration in the EVA encapsulant was experienced in fielded modules from all major US module producers.« less
23 CFR 635.116 - Subcontracting and contractor responsibilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...
23 CFR 635.116 - Subcontracting and contractor responsibilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...
23 CFR 635.116 - Subcontracting and contractor responsibilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...
23 CFR 635.116 - Subcontracting and contractor responsibilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...
48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2013 CFR
2013-10-01
... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...
48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2011 CFR
2011-10-01
... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...
48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2014 CFR
2014-10-01
... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...
48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2012 CFR
2012-10-01
... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...
48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2010 CFR
2010-10-01
... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...
Code of Federal Regulations, 2010 CFR
2010-10-01
... laws to subcontracts for the acquisition of commercial items. 212.504 Section 212.504 Federal... PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...
1994-01-01
disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has section for each of the Military...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and small disadvantaged businesses. The
13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, Bruce G
2006-09-29
Since 1998, The Pennsylvania State University has been successfully managing the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by Penn State, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350.more » This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes Penn State and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. Base funding for the selected projects is provided by NETL with matching funds from industry. At the annual funding meeting held in October 2003, ten projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten 2004 projects were completed during the previous annual reporting period and their final reports were submitted with the previous annual report (i.e., 10/01/04-09/30/05). The final report for the remaining project, which was submitted during this reporting period (i.e., 10/01/05-09/30/06), is attached. At the annual funding meeting held in November 2004, eleven projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2005. Three additional projects were selected for funding during the April 2005 tutorial/funding meeting. Subcontracts were let from Penn State to the subcontractors on July 1, 2005. Of these fourteen 2005 projects, eleven have been completed and the final reports are attached. An annual funding meeting was held in November 2005 and the council selected five projects for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2006, except for one that started October 1, 2006.« less
40 CFR 35.4240 - What provisions must my group's TAG contractor comply with if it subcontracts?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false What provisions must my group's TAG contractor comply with if it subcontracts? 35.4240 Section 35.4240 Protection of Environment ENVIRONMENTAL... with if it subcontracts? A TAG contractor must comply with the following provisions when awarding...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...
22 CFR 228.37 - Nationality of employees under contracts or subcontracts for services.
Code of Federal Regulations, 2010 CFR
2010-04-01
... subcontracts for services. 228.37 Section 228.37 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES ON SOURCE, ORIGIN AND NATIONALITY FOR COMMODITIES AND SERVICES FINANCED BY USAID Conditions Governing... contracts or subcontracts for services. (a) The rules set forth in §§ 228.31 through 228.36 do not apply to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... laws to subcontracts for the acquisition of commercial items. 12.504 Section 12.504 Federal Acquisition... Applicability of Certain Laws to the Acquisition of Commercial Items and Commercially Available Off-The-Shelf Items 12.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 801.220 Section 801.220 Grants and... DEBARMENT AND SUSPENSION Covered Transactions § 801.220 What contracts and subcontracts, in addition to...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...
Code of Federal Regulations, 2013 CFR
2013-10-01
... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...
Code of Federal Regulations, 2011 CFR
2011-10-01
... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...
Special environmental control and life support equipment test analyses and hardware
NASA Technical Reports Server (NTRS)
Callahan, David M.
1995-01-01
This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.
2017-11-01
Richard Ginman, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts...publication, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts, http...FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts. Arlington, VA: National Defense Industrial Association NDIA), 2016. http
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cunningham, D.W.; Skinner, D.E.
1999-10-26
The objective of this Phase 1 subcontract was to establish an efficient production plating system capable of depositing thin-film CdTe and CdS on substrates up to 0.55 m{sup 2}. This baseline would then be used to build on and extend deposition areas to 0.94 m{sup 2} in the next two phases. The following achievements have been demonstrated: {sm{underscore}bullet} Chemical-bath deposition of CdS and electrochemical deposition of CdTe was demonstrated on 0.55 m{sup 2} substrates. The films were characterized using optical and electrical techniques, to increase the understanding of the materials and aid in loss analysis. {sm{underscore}bullet} A stand-alone, prototype CdTemore » reaction tank was built and commissioned, allowing the BP Solar team to perform full-scale trials as part of this subcontract. {sm{underscore}bullet} BP Solar installed two outdoor systems for reliability and performance testing. {sm{underscore}bullet} The 2-kW, ground-mounted, grid-connected system contains seventy-two 0.43-m{sup 2} Apollo{reg{underscore}sign} module interconnects. {sm{underscore}bullet} Two modules have been supplied to NREL for evaluation on their Performance and Energy Rating Test bed (PERT) for kWh evaluation. {sm{underscore}bullet} BP Solar further characterized the process waste stream with the aim to close-loop the system. Currently, various pieces of equipment are being investigated for suitability of particle and total organic compound removal.« less
48 CFR 44.305-2 - Notification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... approved. The system approval notification shall identify the class or classes of subcontracts requiring... has revealed sufficient weaknesses in a particular area of subcontracting to warrant special attention...
48 CFR 244.202-2 - Considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent to Subcontracts 244.202-2 Considerations. (a) Where other than lowest price is the basis for subcontractor selection, has...
Kim, Kyung Woo; Park, Sung Jin; Lim, Hae Sun; Cho, Hm Hak
2017-09-01
Safety climate and occupational stress are related with occupational accident. The present study tried to identify the differences in safety climate and occupational stress according to occupational accidents experience and employment type (e.g., direct workers and subcontract workers). In this study, we conducted a survey using safety climate scale and Korean Occupational Stress Scale and classified the participants into four groups: direct workers working for accident-free departments, direct workers working for accident departments, subcontract workers working for accident-free departments, and subcontract workers working for accident departments for 2 years within the same workplace in the shipbuilding industry. The direct workers and subcontract workers showed diverse results in subscales of safety climate and occupational stress. This result is supported by existing studies; however, further study is necessary for more supporting evidence and elaborative methodological approach. The necessity of management for safety climate and psychosocial factor such as occupational stress for both direct workers and subcontract workers as a whole is suggested by this study.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
..., Submission, and Negotiation of Subcontracting Plans; Correction AGENCY: General Services Administration (GSA..., Preparation, Submission, and Negotiation of Subcontracting Plans; Correction. Correction In the information...
48 CFR 3019.705 - Responsibilities for the contracting officer under the subcontracting program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705...
Code of Federal Regulations, 2010 CFR
2010-10-01
...-based system for small business subcontracting program reporting. Failure to make a good faith effort to... planned subcontracting in support of the specific contract, except that indirect costs incurred for common...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
...DoD is issuing this final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to implement section 826 of the National Defense Authorization Act for Fiscal Year 2011. Section 826 amended the DoD pilot program for transition to follow-on contracting after use of other transaction authority, to establish that the threshold limitation of $50 million for contracts and subcontracts under the program includes the dollar value of all options.
1981-09-18
IMP~mnl~~~U LayL 95-507 SubcontractjfQ fd Surety Bond Waiver Provisiolns 3as8en Limted. The Small Business Administration, working with a...Presidential Advisory Committee has no fll ipleetd the small business sub- L ~ 3 cowtractlgpoiin The committee has fo- cused on obtaining subcontracts from...GAO recommends changes SBA should make to nmimize subcontracting opportunities for small businesses . Also, GAO sugssthat the provision for 2 years
48 CFR 552.219-73 - Goals for Subcontracting Plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552..., historical performance and significant achievements in placing subcontracts for the same or similar products...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2011 CFR
2011-10-01
... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2013 CFR
2013-10-01
... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...
Scientific Data Analysis and Software Support: Geodynamics
NASA Technical Reports Server (NTRS)
Klosko, Steven; Sanchez, B. (Technical Monitor)
2000-01-01
The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System NUCLEAR REGULATORY COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705...
48 CFR 49.108-4 - Authorization for subcontract settlements without approval or ratification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-4 Authorization for subcontract settlements without approval or ratification. (a)(1) The...
Code of Federal Regulations, 2010 CFR
2010-10-01
... DOE to acquire utility service(s) by subcontract, i.e., what the benefits are, such as economic..., shall be applied to a subcontract level acquisition for furnishing utility services to a facility owned...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 319.705...
13 CFR 125.3 - Subcontracting assistance.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...
13 CFR 125.3 - Subcontracting assistance.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...
Code of Federal Regulations, 2010 CFR
2010-10-01
....202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.202...) Character and difficulty of subcontracting, including selection, placement, and management of subcontracts...
48 CFR 952.250-70 - Nuclear hazards indemnity agreement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... obligation under this contract and shall be unaffected by the death, disability, or termination of existence...) Inclusion in subcontracts. The Contractor shall insert this clause in any subcontract which may involve the...
48 CFR 552.219-73 - Goals for Subcontracting Plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...
48 CFR 552.219-73 - Goals for Subcontracting Plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...
48 CFR 552.219-73 - Goals for Subcontracting Plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...
48 CFR 552.219-73 - Goals for Subcontracting Plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
14 CFR 1274.103 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... Subcontracting dollar threshold. The dollar amount of the cooperative agreement subject to the small business subcontracting policies (includes small business, veteran-owned small business, service-disabled veteran-owned small business, historically underutilized small business, small disadvantaged business, women-owned...
13 CFR 125.3 - Subcontracting assistance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... feasible units, as appropriate, to facilitate small business participation; (ii) Conducting market research... its subcontracting plan. (e) CMR Responsibilities. Commercial Market Representatives (CMRs) are SBA's... other resources and tools; (4) Counseling small business concerns on how to market themselves to large...
48 CFR 2944.202 - Contracting officer's evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contracting officer's evaluation. 2944.202 Section 2944.202 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent To Subcontract 2944.202 Contracting officer's...
48 CFR 44.202-1 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 44.202-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... notification and supporting data to ensure that the proposed subcontract is appropriate for the risks involved... during negotiations, the contracting officer shall identify those subcontracts in paragraph (j) of the...
13 CFR 121.410 - What are the size standards for SBA's Section 8(d) Subcontracting Program?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Size Eligibility Requirements for Government Procurement § 121.410 What are the size standards for SBA... Small Business Act, a concern is small for subcontracts which relate to Government procurements if it...
Subcontracting Opportunities with DoD Major Prime Contractors
1996-06-01
The Department of Defense (DoD) offers two markets for small business and small disadvantaged business seeking defense contracting and defense...opportunities. The publication exclusively addresses the defense subcontracting opportunities market. The DoD encourages small business and small disadvantaged
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Objective. 44.301 Section... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.301 Objective. The objective of... which the contractor spends Government funds and complies with Government policy when subcontracting...
23 CFR 635.116 - Subcontracting and contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...
48 CFR 5.206 - Notices of subcontracting opportunities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...
48 CFR 1419.705-2 - Determining the need for a subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Determining the need for a subcontracting plan. 1419.705-2 Section 1419.705-2 Federal Acquisition Regulations System DEPARTMENT OF THE... recommendations offered. ...
48 CFR 5.206 - Notices of subcontracting opportunities.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...
48 CFR 5.206 - Notices of subcontracting opportunities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...
48 CFR 5.206 - Notices of subcontracting opportunities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...
48 CFR 5.206 - Notices of subcontracting opportunities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...
48 CFR 35.009 - Subcontracting research and development effort.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the best scientific and technological sources, it is important that the contractor not subcontract technical or scientific work without the contracting officer's advance knowledge. During the negotiation of a cost-reimbursement R&D contract, the contracting officer shall obtain complete information...
48 CFR 1652.244-70 - Subcontracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. 1652.244-70 Section 1652.244-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CLAUSES AND FORMS CONTRACT CLAUSES Texts of FEHBP Clauses...
42 CFR 422.202 - Participation procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... procedures. (a) Notice and appeal rights. An MA organization that operates a coordinated care plan or network... of groups of physicians, through reasonable procedures that include the following: (1) Written notice... guidelines. (c) Subcontracted groups. An MA organization that operates an MA plan through subcontracted...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
76 FR 74749 - Small Business Subcontracting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... amend its regulations to implement provisions of the Small Business Jobs Act of 2010 (Jobs Act... used in preparing its bid or proposal during contract performance. SBA also proposed to amend its... and evaluating small business subcontracting plan performance. SBA also proposed to clarify which...
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 30.001...
48 CFR 2919.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...
Code of Federal Regulations, 2011 CFR
2011-10-01
... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS) rules and regulations for which a contractor or subcontractor— (1) Used one cost accounting practice to...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
48 CFR 15.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...
48 CFR 15.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...
48 CFR 15.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...
48 CFR 319.705-5 - Awards involving subcontracting plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...
48 CFR 319.705-5 - Awards involving subcontracting plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...
48 CFR 1252.217-74 - Subcontracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracts. 1252.217-74 Section 1252.217-74 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CLAUSES AND FORMS...) Nothing contained in the contract shall be construed as creating any contractual relationship between any...
14 CFR § 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
48 CFR 19.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...
48 CFR 19.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...
48 CFR 19.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...
48 CFR 19.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...
13 CFR 125.3 - Subcontracting assistance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... other resources and tools; (4) Counseling small business concerns on how to market themselves to large... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Subcontracting assistance. 125.3 Section 125.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION GOVERNMENT CONTRACTING PROGRAMS...
Subcontracted activities related to TES for building heating and cooling
NASA Technical Reports Server (NTRS)
Martin, J.
1980-01-01
The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Covered Contracts Generally § 4.114 Subcontracts. (a) “Contractor” as including “subcontractor... contractor undertakes a contract subject to the Act, the contractor agrees to assume the obligation that the...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
24 CFR 115.309 - Subcontracting under the FHAP.
Code of Federal Regulations, 2013 CFR
2013-04-01
... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...
24 CFR 115.309 - Subcontracting under the FHAP.
Code of Federal Regulations, 2011 CFR
2011-04-01
... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...
24 CFR 115.309 - Subcontracting under the FHAP.
Code of Federal Regulations, 2012 CFR
2012-04-01
... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...
24 CFR 115.309 - Subcontracting under the FHAP.
Code of Federal Regulations, 2014 CFR
2014-04-01
... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...
24 CFR 115.309 - Subcontracting under the FHAP.
Code of Federal Regulations, 2010 CFR
2010-04-01
... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...
48 CFR 49.108-7 - Government assistance in settling subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government assistance in settling subcontracts. 49.108-7 Section 49.108-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-7 Government assistance in...
48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 49.107 Section 49.107 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49...
48 CFR 12.500 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items and... law that are not applicable to— (1) Contracts for the acquisition of commercial items; (2) Subcontracts, at any tier, for the acquisition of commercial items; and (3) Contracts and subcontracts, at any...
77 FR 29983 - Federal Acquisition Regulation; Information Collection; Subcontract Consent
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-21
... performance of functions of the Federal Acquisition Regulation (FAR), and whether it will have practical... The objective of consent to subcontract, as discussed in FAR Part 44, is to evaluate the efficiency and effectiveness with which the contractor spends Government funds, and complies with Government...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 52.219-26 - Small Disadvantaged Business Participation Program-Incentive Subcontracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACT CLAUSES Text of Provisions and Clauses 52.219-26 Small Disadvantaged Business Participation... the following: Small Disadvantaged Business Participation Program—Incentive Subcontracting (OCT 2000... its offer to try to award a certain amount to small disadvantaged business concerns in the North...
41 CFR 51-4.4 - Subcontracting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Subcontracting. 51-4.4 Section 51-4.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... both with efficient performance in furnishing commodities or services under the JWOD Act and maximizing...
48 CFR 9.104-3 - Application of standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the... requires a subcontracting plan pursuant to Subpart 19.7, The Small Business Subcontracting Program, the... prospective contractor's responsibility. (d)(1) Small business concerns. Upon making a determination of...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
NASA Astrophysics Data System (ADS)
Mittchell, Richard L.; Symko-Davies, Martha; Thomas, Holly P.; Witt, C. Edwin
1999-03-01
The Photovoltaic Manufacturing Technology (PVMaT) Project is a government/industry research and development (R&D) partnership between the U.S. federal government (through the U.S. Department of Energy [DOE]) and members of the U.S. PV industry. The goals of PVMaT are to assist the U.S. PV industry improve module manufacturing processes and equipment; accelerate manufacturing cost reductions for PV modules, balance-of-systems components, and integrated systems; increase commercial product performance and reliability; and enhance investment opportunities for substantial scale-ups of U.S.-based PV manufacturing plant capacities. The approach for PVMaT has been to cost-share the R&D risk as industry explores new manufacturing options and ideas for improved PV modules and components, advances system and product integration, and develops new system designs. These activities will lead to overall reduced system life-cycle costs for reliable PV end-products. The 1994 PVMaT Product-Driven BOS and Systems activities, as well as Product-Driven Module Manufacturing R&D activities, are just being completed. Fourteen new subcontracts have just been awarded in the areas of PV System and Component Technology and Module Manufacturing Technology. Government funding, subcontractor cost-sharing, and a comparison of the relative efforts by PV technology throughout the PVMaT project are also discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1991-05-23
This final report for LANL Subcontract 9-XS8-2604-1 includes copies of all formal letters, memorandums, and reports provided by CAG to support the IDS effort in the LANL Test Managers Office, Las Vegas, Nevada from October 1, 1989 through the end of the contract on December 31, 1990. The material is divided into two sections; the Functional Requirements Document (FRD) and other reports, letters, and memorandums. All documents are arranged in chronological order with most recent last. Numerous draft copies of the FRD were prepared and cover sheets for all drafts are included. The complete text of only the last versionmore » supplied (July 27, 1990) is included in this document.« less
48 CFR 52.219-16 - Liquidated Damages-Subcontracting Plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... following clause: Liquidated Damages—Subcontracting Plan (JAN 1999) (a) Failure to make a good faith effort... has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Business, Small Disadvantaged Business and Woman-Owned Small Business Concerns. 970.1907 Section 970.1907... MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907 Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...
48 CFR 52.230-6 - Administration of Cost Accounting Standards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and subcontract incentives, fees, and profits associated with the increased or decreased costs to the... increase or decrease in contract and subcontracts incentives, fees, and profits associated with the... desirable and not detrimental to the Government and is, therefore, not subject to the no increased cost...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...
41 CFR 60-1.45 - Existing contracts and subcontracts.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...
41 CFR 60-1.45 - Existing contracts and subcontracts.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...
31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.
Code of Federal Regulations, 2011 CFR
2011-07-01
... economic development of resources in Burma. 537.410 Section 537.410 Money and Finance: Treasury Regulations... BURMESE SANCTIONS REGULATIONS Interpretations § 537.410 Contracts and subcontracts regarding economic... supervision and guarantee of another person's performance of a contract that includes the economic development...
40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.
Code of Federal Regulations, 2011 CFR
2011-07-01
... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...
40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.
Code of Federal Regulations, 2012 CFR
2012-07-01
... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...
40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.
Code of Federal Regulations, 2013 CFR
2013-07-01
... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...
40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...
40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.
Code of Federal Regulations, 2014 CFR
2014-07-01
... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...
48 CFR 49.108-8 - Assignment of rights under subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Assignment of rights under subcontracts. 49.108-8 Section 49.108-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-8 Assignment of rights under...
48 CFR 1449.107 - Audit of prime contract settlement proposals and subcontract settlements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 1449.107 Section 1449.107 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1449...
48 CFR 44.400 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 44.400 Scope... required to apply to any subcontractors that are furnishing commercial items or commercial components in accordance with Section 8002(b)(2) of Public Law 103-355 and Section 826 of Public Law 110-181 (10 U.S.C...
48 CFR 252.219-7003 - Small business subcontracting plan (DoD contracts).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7003 Small business subcontracting plan (DoD contracts). As prescribed in 219.708(b)(1)(A), use the following clause: Small Business...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-26
... Compensation B. Definitions C. Thresholds D. Paperwork Burden E. Applicability F. Subcontract Award Data G... definition of ``first- tier subcontractor.'' Comment: A number of respondents believed that executive... technologies and ideas, and increase the Government's costs by reducing competition. These respondents also...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-13
..., Federal agencies are required to publish notice in the Federal Register concerning each proposed... response to the notice. This notice solicits comments on information needed to collect information from subcontractors to compare information obtained from subcontracting plans submitted by prime contractors in order...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Do tribal employment rights ordinances apply to... OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER... rights ordinances apply to construction contracts and subcontracts? Yes. Tribal employment rights...
48 CFR 752.226-2 - Subcontracting with disadvantaged enterprises.
Code of Federal Regulations, 2010 CFR
2010-10-01
... management and daily business are controlled by one or more such individuals. (2) Owned by socially and... disadvantaged enterprises. 752.226-2 Section 752.226-2 Federal Acquisition Regulations System AGENCY FOR... Clauses 752.226-2 Subcontracting with disadvantaged enterprises. As prescribed in 726.7007, insert the...
48 CFR 52.215-23 - Limitations on Pass-Through Charges.
Code of Federal Regulations, 2010 CFR
2010-10-01
... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Protecting the Government....209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. As prescribed in 9.409, insert the following clause: Protecting the...
subcontract or NREL Procurement. Appendix B-1 (07/11/14) Standard Terms and Conditions for (1) Cost Sharing , (2) Cost Reimbursement, and (3) Cost Plus Fixed Fee. Appendix B-2 (07/11/14) Standard Terms and Conditions for Cost Type Subcontracts with Educational Institutions Appendix B-10 (07/11/14) Standard Terms
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...
26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.
Code of Federal Regulations, 2012 CFR
2012-04-01
... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...
26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.
Code of Federal Regulations, 2010 CFR
2010-04-01
... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...
26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.
Code of Federal Regulations, 2011 CFR
2011-04-01
... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...
13 CFR 121.411 - What are the size procedures for SBA's Section 8(d) Subcontracting Program?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the size procedures for SBA's Section 8(d) Subcontracting Program? 121.411 Section 121.411 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and Standards...
48 CFR 52.232-27 - Prompt payment for construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the... include such clauses in their subcontracts with each lower-tier subcontractor or supplier. (d) Subcontract... impair the right of the Contractor or a subcontractor at any tier to negotiate, and to include in their...
31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.
Code of Federal Regulations, 2014 CFR
2014-07-01
... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...
ERIC Educational Resources Information Center
Eccles, Robert G.
1981-01-01
Examines the factors that influence subcontracting and type of management in the construction industry. Argues that subcontracting is explained by a construction firm's size, complexity, and market extent, and that management type results from a firm's size and role in the production process and from census classification problems. (Author/RW)
48 CFR 52.230-6 - Administration of Cost Accounting Standards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...
48 CFR 52.230-6 - Administration of Cost Accounting Standards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...
48 CFR 52.230-6 - Administration of Cost Accounting Standards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...
48 CFR 19.707 - The Small Business Administration's role in carrying out the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... nature; and (4) Evaluate compliance with subcontracting plans, either on a contract-by-contract basis, or...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-23
... Subcontracting Report for Service Disabled Veteran-owned Small Business and Veteran-owned Small Business Concerns) Activities Under OMB Review AGENCY: Office of Small and Disadvantaged Business Utilization, Department of... U.S.C. 3501-3521), this notice announces that the Office of Small and Disadvantaged Business...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Compaan, A. D.; Deng, X.; Bohn, R. G.
2003-10-01
This is the final report covering about 42 months of this subcontract for research on high-efficiency CdTe-based thin-film solar cells and on high-efficiency a-Si-based thin-film solar cells. Phases I and II have been extensively covered in two Annual Reports. For this Final Report, highlights of the first two Phases will be provided and then detail will be given on the last year and a half of Phase III. The effort on CdTe-based materials is led by Prof. Compaan and emphasizes the use of sputter deposition of the semiconductor layers in the fabrication of CdS/CdTe cells. The effort on high-efficiency a-Simore » materials is led by Prof. Deng and emphasizes plasma-enhanced chemical vapor deposition for cell fabrication with major efforts on triple-junction devices.« less
48 CFR 52.215-22 - Limitations on Pass-Through Charges-Identification of Subcontract Effort.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... The offeror's proposal shall exclude excessive pass-through charges. (c) Performance of work by the..., under the contract, task order, or delivery order. (2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery...
Code of Federal Regulations, 2010 CFR
2010-07-01
... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...
Code of Federal Regulations, 2013 CFR
2013-07-01
... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...
Code of Federal Regulations, 2011 CFR
2011-07-01
... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...
Code of Federal Regulations, 2012 CFR
2012-07-01
... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...
Code of Federal Regulations, 2014 CFR
2014-07-01
... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...
48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...
13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?
Code of Federal Regulations, 2014 CFR
2014-01-01
... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition threshold. 13.005 Section 13.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Y. M.
2004-12-01
The key objective of this subcontract was to take the first steps to extend the radio-frequency plasma-enhanced chemical vapor deposition (RF-PECVD) manufacturing technology of Energy Photovoltaics, Inc. (EPV), to the promising field of a-Si/nc-Si solar cell fabrication by demonstrating ''proof-of-concept'' devices of good efficiencies that previously were believed to be unobtainable in single-chamber reactors owing to contamination problems. A complementary goal was to find a new high-rate deposition method that can conceivably be deployed in large PECVD-type reactors. We emphasize that our goal was not to produce 'champion' devices of near-record efficiencies, but rather, to achieve modestly high efficiencies usingmore » a far simpler (cheaper) system, via practical processing methods and materials. To directly attack issues in solar-cell fabrication at EPV, the nc-Si thin films were studied almost exclusively in the p-i-n device configuration (as absorbers or i-layers), not as stand-alone films. Highly efficient, p-i-n type, nc-Si-based solar cells are generally grown on expensive, laboratory superstrates, such as custom ZnO/glass of high texture (granular surface) and low absorption. Also standard was the use of a highly effective back-reflector ZnO/Ag, where the ZnO can be surface-textured for efficient diffuse reflection. The high-efficiency ''champion'' devices made by the PECVD methods were invariably prepared in sophisticated (i.e., expensive), multi-chamber, or at least load-locked deposition systems. The electrode utilization efficiency, defined as the surface-area ratio of the powered electrode to that of the substrates, was typically low at about one (1:1). To evaluate the true potential of nc-Si absorbers for cost-competitive, commercially viable manufacturing of large-area PV modules, we took a more down-to-earth approach, based on our proven production of a-Si PV modules by a massively parallel batch process in single-chamber RF-PECVD systems, to the study of nc-Si solar cells, with the aim of producing high-efficiency a-Si/nc-Si solar cells and sub-modules.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rodman, John A.
MOLIS is an online database of minority institutions, and is used by federal agencies to identify peer reviewers and by majority institutions to identify possible collaborations and sub-contracts. MOLIS includes in-depth information about the research and educational capabilities of Historically Black Colleges and Universities (HBCUs), Hispanic Serving Institutions (HSIs), and Tribal Colleges. Included with this report are several annual progress reports, a list of all minority institutions currently on MOLIS, a list of outreach activities, etc.
ALPHA SMP SYSTEM(S) Final Report CRADA No. TC-1404-97
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seager, M.; Beaudet, T.
Within the scope of this subcontract, Digital Equipment Corporation (DIGITAL) and the University, through the Lawrence Livermore National Laboratory (LLNL), engaged in joint research and development activities of mutual interest and benefit. The primary objectives of these activities were, for LLNL to improve its capability to perform its mission, and for DIGITAL to develop technical capability complimentary to this mission. The collaborative activities had direct manpower investments by DIGITAL and LLNL. The project was divided into four areas of concern, which were handled concurrently. These areas included Gang Scheduling, Numerical Methods, Applications Development and Code Development Tools.
Development of the low-field side reflectometer for ITER
NASA Astrophysics Data System (ADS)
Muscatello, Christopher; Anderson, James; Gattuso, Anthony; Doyle, Edward; Peebles, William; Seraydarian, Raymond; Wang, Guiding; Kramer, Gerrit; Zolfaghari, Ali; Atomics Team, General; University of California Los Angeles Team; Princeton Plasma Physics Laboratory Team
2017-10-01
The Low-Field Side Reflectometer (LFSR) for ITER will provide real-time edge density profiles every 10 ms for feedback control and every 24 μs for physics evaluation. The spatial resolution will be better than 5 mm over 30 - 165 GHz, probing the scrape-off layer to the top of the pedestal in H-mode plasmas. An antenna configuration has been selected for measurements covering anticipated plasma elevations. Laboratory validation of diagnostic performance is underway using a LFSR transmission line (TL) mockup. The 40-meter TL includes circular corrugated waveguide, length calibration feature, Gaussian telescope, vacuum windows, containment membranes, and expansion joint. Transceiver modules coupled to the input of the TL provide frequency-modulated (FM) data for evaluation of performance as a monostatic reflectometer. Results from the mockup tests are presented and show that, with some further optimization, the LFSR will meet or exceed the measurement requirements for ITER. An update of the LFSR instrumentation design status is also presented with preliminary test results. Work supported by PPPL under subcontract S013252-A.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Birkmire, R.W.; Phillips, J.E.; Shafarman, W.N.
2000-08-25
This report describes results achieved during phase 1 of a three-phase subcontract to develop and understand thin-film solar cell technology associated to CuInSe{sub 2} and related alloys, a-Si and its alloys, and CdTe. Modules based on all these thin films are promising candidates to meet DOE long-range efficiency, reliability, and manufacturing cost goals. The critical issues being addressed under this program are intended to provide the science and engineering basis for the development of viable commercial processes and to improve module performance. The generic research issues addressed are: (1) quantitative analysis of processing steps to provide information for efficient commercial-scalemore » equipment design and operation; (2) device characterization relating the device performance to materials properties and process conditions; (3) development of alloy materials with different bandgaps to allow improved device structures for stability and compatibility with module design; (4) development of improved window/heterojunction layers and contacts to improve device performance and reliability; and (5) evaluation of cell stability with respect to illumination, temperature, and ambient and with respect to device structure and module encapsulation.« less
Code of Federal Regulations, 2013 CFR
2013-01-01
... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...
NREL photovoltaic program FY 1997 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, R.D.; Hansen, A.; Smoller, S.
1998-06-01
This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less
Code of Federal Regulations, 2011 CFR
2011-01-01
... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1326.220 Section 1326.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1200.220 Section 1200.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...
Hardware Development Process for Human Research Facility Applications
NASA Technical Reports Server (NTRS)
Bauer, Liz
2000-01-01
The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1125.220 Section 1125.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1400.220 Section 1400.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...
Code of Federal Regulations, 2010 CFR
2010-01-01
... determine whether a Participant is small for a particular 8(a) BD subcontract? (a) Self certification by... agency. The Participant also must submit a copy of its offer, including its self-certification as to size... nonmanufacturer rule to, 8(a) BD procurements. (b) Verification of size by SBA. Within 30 days of its receipt of a...
Quinlan, Michael; Bohle, Philip
2008-01-01
The practice of outsourcing or subcontracting of work has grown rapidly in most countries over the past two decades. Outsourcing, de-institutionalization, and a range of other practices have also resulted in a growth of home-based work. Home-based workers, even when not part of a subcontracting process, operate in an isolated situation remote from their employer and other workers. Do such work arrangements expose workers to greater risk of injury, illness, or assault? The authors reviewed international studies of the occupational health and safety (OHS) effects of subcontracting and home-based work undertaken over the past 20 years. Of the 25 studies analyzed, 92 percent found poorer OHS outcomes. The studies were examined for clues about the reasons for these negative outcomes. The authors also identified similarities and differences between subcontracting and home-based work. Despite the evidence of poor OHS outcomes, research into outsourcing has stalled in recent years. With notable exceptions, governments have taken little account of findings on these work arrangements in their laws and policies, in part because neoliberal ideas dominate national and global policy agendas. The authors examine policy challenges and regulatory responses and make suggestions for future research and policy interventions.
2011-07-30
contractor purchasing system review of Anham. Management Comments and Audit Response The Defense Contract Mangement Agency and the U.S. Central... Introduction 1 Background 1 Government Agency Roles and Oversight Responsibilities 4 Objectives 7 Weak Government Oversight Resulted in Significant...Subcontracting Procedures Allowed Questionable Costs To Go Undetected SIGIR 11-022 July 30, 2011 Introduction Since 2003, the United States Government
Multidisciplinary Design Investigation of Truss-Braced Wing Aircraft. Phase 4
NASA Technical Reports Server (NTRS)
Grossman, B.; Kapania, R. K.; Mason, W. H.; Schetz, J. A.
2000-01-01
The subject grant was in effect from 7/l/99 to 10/31/99. The objective of this grant was to complete a strut-braced wing study which began, which was in effect from 6/27/96 until 9/15/99. While the initial grant was on-going, we were also under subcontract to Lockheed-Martin, Aerospace Systems Division, Marietta, GA to do additional studies related to the strut-braced wing grant "A Structural and Aerodynamic Investigation of a Strut-Braced Wing Transonic Aircraft Concept", 4/l/98-11/15/98. Lockheed-Martin was under contract to NASA Langley. Finally the research under this grant has led to a joint proposal from NASA Langley, Locheed-Martin, Virginia Tech and NASA Dryden to develop a transonic strut-braced wing demonstration aircraft in response to Flight Research for Revolutionary Aeronautical Concepts (REVCON). This final report summarizes the research done, augmented by the additional concommitant research projects mentioned above.
Center for Multiscale Plasma Dynamics: Report on Activities (UCLA/MIT), 2009-2010
DOE Office of Scientific and Technical Information (OSTI.GOV)
Troy Carter
2011-04-18
The final 'phaseout' year of the CMPD ended July 2010; a no cost extension was requested until May 2011 in order to enable the MIT subcontract funds to be fully utilized. Research progress over this time included verification and validation activities for the BOUT and BOUT++ code, studies of spontaneous reconnection in the VTF facility at MIT, and studies of the interaction between Alfven waves and drift waves in LAPD. The CMPD also hosted the 6th plasma physics winter school in 2010 (jointly with the NSF frontier center the Center for Magnetic Self-Organization, significant funding came from NSF for thismore » most recent iteration of the Winter School).« less
NASA Technical Reports Server (NTRS)
McCurry, J. B.
1995-01-01
The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nekoogar, F; Martz, Jr., H E
2009-09-23
The purpose of this statement of work is for third party collaborators to train, validate and have Lawrence Livermore National Security, LLC (LLNS) evaluate algorithms to detect liquid threats in digital radiography (DR)/TIP Ready X-ray (TRX) images that will be provided by LLNS through the Transportation and Security Administration (TSA). LLNS will provide a set of images with threat(s) to determine detection rates and non-threat images from airports to determine false alarm rates. A key including a bounding box showing the locations of the threats and non-threats will be provided for the images. It is expected that the Subcontractor shallmore » use half of the images with their keys for training the algorithms and the other half shall be used for validation (third party evaluation) purposes. The Subcontractor shall not use the key to the second half of the data other than for the validation and reporting of the performance of its algorithm (not for training). The Subcontractor has 45 business days from the receipt of datasets and the Subcontract to: (1) Run their detection/classification algorithms on the data; (2) Deliver a final report describing their performance by generating Receiver Operator Characteristic (ROC) curves using their algorithm; and (3) Deliver a copy of the third party's executable software (already trained and validated by the datasets) to LLNL accompanied by a user manual. LLNS will evaluate the performance of the same algorithm on another separate set of data. LLNS evaluation of the Subcontractor's algorithm will be documented in a final report within 30 days of receiving the executable code. This report will be sent to TSA and the report may be disseminated to the Subcontract at TSA's discretion.« less
NASA Technical Reports Server (NTRS)
1963-01-01
This document has been prepared to incorporate all presentation aid material, together with some explanatory text, used during an oral briefing on the Nuclear Lunar Logistics System given at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, on 18 July 1963. The briefing and this document are intended to present the general status of the NERVA (Nuclear Engine for Rocket Vehicle Application) nuclear rocket development, the characteristics of certain operational NERVA-class engines, and appropriate technical and schedule information. Some of the information presented herein is preliminary in nature and will be subject to further verification, checking and analysis during the remainder of the study program. In addition, more detailed information will be prepared in many areas for inclusion in a final summary report. This work has been performed by REON, a division of Aerojet-General Corporation under Subcontract 74-10039 from the Lockheed Missiles and Space Company. The presentation and this document have been prepared in partial fulfillment of the provisions of the subcontract. From the inception of the NERVA program in July 1961, the stated emphasis has centered around the demonstration of the ability of a nuclear rocket to perform safely and reliably in the space environment, with the understanding that the assignment of a mission (or missions) would place undue emphasis on performance and operational flexibility. However, all were aware that the ultimate justification for the development program must lie in the application of the nuclear propulsion system to the national space objectives.
Center for Multiscale Plasma Dynamics: Report on Activities (UCLA/MIT), 2009-2010
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carter, Troy Alan
2014-10-03
The final “phaseout” year of the CMPD ended July 2010; a no cost extension was requested until May 2011 in order to enable the MIT subcontract funds to be fully utilized. Research progress over this time included verification and validation activities for the BOUT and BOUT++ code, studies of spontaneous reconnection in the VTF facility at MIT, and studies of the interaction between Alfv´en waves and drift waves in LAPD. The CMPD also hosted the 6th plasma physics winter school in 2010 (jointly with the NSF frontier center the Center for Magnetic Self-Organization, significant funding came from NSF for thismore » most recent iteration of theWinter School).« less
Monitoring the Hazards of Silicic Volcanoes with Remote Sensing
NASA Technical Reports Server (NTRS)
Fink, Jonathan; Wessels, Rick; Eisinger, Chris; Ramsey, Michael; Hellman, Melanie; Kuhn, Sally
2004-01-01
This report details the final progress on the Solid Earth and Natural Hazards project: Monitoring of Hazards of Silicic Volcanoes with Remote Sensing (SENH99-0000-0159). The original award went to Arizona State University (ASU) with Dr. Jonathan Fink as the P.I. and Dr. Michael Ramsey as the Co-I. In May 2000, Dr. Ramsey left ASU to take a tenure-track faculty position at the University of Pittsburgh. The principle investigators and NASA Headquarters agreed to split the grant award at the HQ level and therefore avoid the double overhead charges that would arise from a university subcontract. The objectives of the science were divided, and coordinated yearly progress reports have been submitted from each University. This report details the final progress on work carried out at Arizona State. A report by Dr. Ramsey at the University of Pittsburgh has already been submitted. The work from both institutions is closely related and this report will reflect that connection.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pratt, D.C.; Dubbe, D.R.; Garver, E.G.
1984-07-01
The high yield potential and attractive chemical composition of Typha make it a particularly viable energy crop. The Minnesota research effort has demonstrated that total annual biomass yields equivalent to 30 dry tonnes/ha (13 tons/acre) are possible in planted stands. This compares with yields of total plant material between 9 and 16 dry tonnes/ha (4 to 7 tons/acre) in a typical Minnesota corn field. At least 50% of the Typha plant is comprised of a belowground rhizome system containing 40% starch and sugar. This high level of easily fermentable carbohydrate makes rhizomes an attractive feedstock for alcohol production. The abovegroundmore » portion of the plant is largely cellulose, and although it is not easily fermentable, it can be gasified or burned. This report is organized in a manner that focuses on the evaluation of the management options task. Results from stand management research performed at the University of Minnesota during 1982 and 1983 are integrated with findings from an extensive survey of relevant emergent aquatic plant research and utilization. These results and findings are then arranged in sections dealing with key steps and issues that need to be dealt with in the development of a managed emergent aquatic bio-energy system. A brief section evaluating the current status of rhizome harvesting is also included along with an indexed bibliography of the biology, ecology, and utilization of Typha which was completed with support from this SERI subcontract. 686 references, 11 figures, 17 tables.« less
Final Report for''Numerical Methods and Studies of High-Speed Reactive and Non-Reactive Flows''
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwendeman, D W
2002-11-20
The work carried out under this subcontract involved the development and use of an adaptive numerical method for the accurate calculation of high-speed reactive flows on overlapping grids. The flow is modeled by the reactive Euler equations with an assumed equation of state and with various reaction rate models. A numerical method has been developed to solve the nonlinear hyperbolic partial differential equations in the model. The method uses an unsplit, shock-capturing scheme, and uses a Godunov-type scheme to compute fluxes and a Runge-Kutta error control scheme to compute the source term modeling the chemical reactions. An adaptive mesh refinementmore » (AMR) scheme has been implemented in order to locally increase grid resolution. The numerical method uses composite overlapping grids to handle complex flow geometries. The code is part of the ''Overture-OverBlown'' framework of object-oriented codes [1, 2], and the development has occurred in close collaboration with Bill Henshaw and David Brown, and other members of the Overture team within CASC. During the period of this subcontract, a number of tasks were accomplished, including: (1) an extension of the numerical method to handle ''ignition and grow'' reaction models and a JWL equations of state; (2) an improvement in the efficiency of the AMR scheme and the error estimator; (3) an addition of a scheme of numerical dissipation designed to suppress numerical oscillations/instabilities near expanding detonations and along grid overlaps; and (4) an exploration of the evolution to detonation in an annulus and of detonation failure in an expanding channel.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hale, H.J.
1978-01-01
This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less
The Department of the Navy Subcontracting Program Update
2014-08-01
calculaCon of single FY acCvity at the contract level Tot Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014 Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0
NASA Technical Reports Server (NTRS)
1990-01-01
It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.
NASA Astrophysics Data System (ADS)
Anderson, B. J.; Korth, H.; Erlandson, R. E.
2017-12-01
The Active Magnetosphere and Planetary Electrodynamics Response Experiment (AMPERE) was made possible by harnessing an fortuitous capability of the Iridium Communications constellation of 70 polar orbiting satellites. In 1996 it was realized that the attitude magnetometers on-board the Iridium satellites, then in fabrication, could potentially be used to obtain the first ever global and continuous measurements of the Birkeland currents with a sufficiently short re-sampling cadence (10 minutes) to track the dynamic evolution of the large-scale currents. The experience of taking this idea from 1996 through various research grant supported efforts, mission of opportunity proposal attempts, and finally through funding and implementation as a National Science Foundation geospace facility, revealed a number of challenges both in proposing innovative solutions to existing sponsor programs and also in working between the federal sponsor community and the private commercial space environment. Implementing AMPERE required a code change to on-board software on the Iridium satellites and it proved necessary to engage NASA to adjust the solicitation language to allow AMPERE. For NASA proposals we also encountered a conflict with respect to federal sponsorship such that the original business configuration of Iridium could not accept the accounting regime implied by a sub-contract derived from a federal contract acquisition. Subsequent mission of opportunity efforts encountered various other challenges including the cancellation of an explorer to fund the exploration initiative in 2001. The facilities proposal to NSF was almost not submitted owing a funding vehicle disparity between the preferred proposer structure (contract) vs NSF's requirement to fund only grants and a final hurdle concerned the structure of the contract with Iridium which was initially a sub-contract but was changed to a fixed-price data purchase due to NSF's limitations on funding fee-bearing engineering services. More general differences in the federal procurement timeline versus the corporate decision making timeline were also encountered. These lessons in the industry/federal partnership for innovative science are discussed as they may offer guidance for future efforts.
Goldman - Georgetown University | Division of Cancer Prevention
Principal Investigator: Radoslav (Rado) Goldman, PhDInstitution: Georgetown University, Washington, DC Subcontract Principal Investigator: Raja Mazumder, PhDInstitution: George Washington University |
Ryu, Jia; Lim, Key Hwan; Ryu, Dong-Ryeol; Lee, Hyang Woon; Yun, Ji Young; Kim, Seoung-Wook; Kim, Ji-Hoon; Jung-Choi, Kyunghee; Kim, Hyunjoo
2016-01-01
Methyl alcohol poisoning has been mainly reported in community. Two cases of methyl alcohol poisoning occurred in a small-sized subcontracted factory which manufactured smartphone parts in Korea. One young female patient presented with dyspnea and visual disturbance. Another young male patient presented with visual disturbance and myalgia. They treated with sodium bicarbonate infusion and hemodialysis for metabolic acidosis. In addition, he received ethyl alcohol per oral treatment. Her and his urinary methyl alcohol concentration was detected as 7.632 mg/L, 46.8 mg/L, respectively, although they were treated hemodialysis. Results of the working environment measurement showed that the concentration of methyl alcohol (1030.1-2220.5 ppm) in the air exceeded the time weighted average (200 ppm). They were diagnosed with optic neuropathy due to methyl alcohol poisoning and still have visual impairment. Workers who hired as dispatched employees in a small-sized subcontracted factory were exposed to high concentrations of methyl alcohol. The workplace had poor ventilation system. In addition, workers did not wear proper personal protect equipment. Working environment measurement and annual chekups for workers were not performed. They were in a blind spot to occupational safety and health. More attention is needed to protect vulnerable workers' health.
High Technology Engineering Services, Inc. fiscal year 1993 and 1994 research and development report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This document has been prepared by the Professional Staff of High Technology Engineering Services, Inc. (HTES) for fiscal year (FY) 1993. Work was performed for various aspects of mechanical design and analysis, materials development and properties quantification, nuclear environment performance, and engineering program prioritization. The tasks enumerated in the subcontract, attachment B are: 1. Assist in preparation of final R&D report for SDC detector development. 2. Subcontractor shall make contributions to the development of innovative processes for the manufacture of quasi- isotropic, enhanced thermal conductivity compression molded advanced composite materials. 3. Perform finite element analysis as it relates to themore » Superconducting Super Collider Silicon Tracking System, both mechanical and thermal, of very thin section advanced composite materials. 4. Subcontractor shall perform technical studies, reviews, and assessments of the current program for advanced composites materials processing and testing. 5. Subcontractor shall attend meetings and discussions as directed by MEE-12 technical representative. Unfortunately during the course of FY93, technical and financial challenges prevailed against the aggressive goals set for the program. In point of fact, less than 25% of the contract value was able to be expended due to technical delays and programmatic funding cuts. Also, contracting difficulties with the SSC Lab and financial burdens at Los Alamos totally stopped progress on the subject subcontract during the whole of FY94. This was a great blow to me and the HTES, Inc. technical staff. Despite the negative influences over the years, significant progress was made in materials properties quantification and development of essential research and development documentation. The following brief report and attendant appendices will address these achievements.« less
How to make an affiliate model work--a case history.
Baumgartner, A J; Berns, A; Stedman, T W
1984-01-01
The North Shore Community Mental Health Center has an unusual mental health delivery system. "Out-stationed" staff work in affiliated agencies, yet are employees of the NSCMHC. This service configuration is the result of an arduous planning process which weighed the advantages of several organizational models. On one extreme was a "Centralized" model, wherein one organization was solely responsible for delivering mental health services. On the other extreme was an "Umbrella" model, wherein the organization acted as a fiscal conduit to several service providers. Somewhere in the middle a compromise was found with a "Lead Agency" model. Here, an organization provides the administrative structure, provides some services, and subcontracts the remaining services. The North Shore Community Mental Health Center adapted this system one step further. Rather than subcontracting services, it outstationed CMHC staff to affiliate agencies. United Cerebral Palsy Association of the North Shore is one of the CMHC's affiliates. The service need for family and play therapists resulted in two CMHC therapists being outstationed at UCP. The affiliation agreement between the two organizations specify the responsibilities and roles each have. The hiring process between the two organizations is an example of the duality of the system. Both agencies had interviewing roles, yet the final hiring decision was the affiliate's, since the employee would spend the majority of his/her time outstationed at the affiliate side. Outstationed staff integration to the North Shore Community Mental Health Center presented problems, however. Since these were new staff hired with federal funds, and since their visibility at the Center was minimal, they had some difficulty being identified as Center staff by existing employees.(ABSTRACT TRUNCATED AT 250 WORDS)
Nakashima, Kei; Aoshima, Masahiro; Ohkuni, Yoshihiro; Hoshino, Eri; Hashimoto, Kohei; Otsuka, Yoshihito
2014-12-01
Loop-mediated isothermal amplification (LAMP) is becoming an established nucleic acid amplification method offering rapid, accurate, and cost-effective diagnosis of infectious diseases. We retrospectively evaluated 78 consecutive HIV-uninfected patients who underwent LAMP method for diagnosing Pneumocystis pneumonia (PCP). Diagnosis of PCP was made by the detection of Pneumocystis jirovecii (P. jirovecii) with positive LAMP or conventional staining (CS) (Grocott methenamine silver staining or Diff-Quick™) on the basis of compatible clinical symptoms and radiologic findings. Additionally, we reviewed HIV-uninfected immunocompromised patients who underwent subcontract PCR as a historical control. LAMP was positive in 10 (90.9%) of 11 positive-CS patients. Among 13 negative-CS patients with positive LAMP, 11 (84.6%) had PCP, and the remaining 2 were categorized as having P. jirovecii colonization. LDH levels in negative-CS PCP were higher than in positive-CS PCP (p = 0.026). (1 → 3)-β-D-glucan levels in negative-CS PCP were lower than in positive-CS PCP (p = 0.011). The interval from symptom onset to diagnosis as PCP in LAMP group (3.45 ± 1.77 days; n = 22) was shorter than in subcontract PCR group (6.90 ± 2.28 days; n = 10; p < 0.001). As for patients without PCP, duration of unnecessary PCP treatment in LAMP group (2; 2-3 days; n = 10) was shorter than in subcontract PCR group (7; 7-12.25 days; n = 6; p = 0.003). LAMP showed higher sensitivity (95.4%) and positive predictive value (91.3%) than subcontract PCR did. Pneumocystis LAMP method is a sensitive and cost-effective diagnostic method and is easy to administer in general hospitals. In-house LAMP method would realize early diagnosis of PCP, resulting in improving PCP prognosis and reducing unnecessary PCP-specific treatment. Copyright © 2014 Japanese Society of Chemotherapy and The Japanese Association for Infectious Diseases. Published by Elsevier Ltd. All rights reserved.
Improved self-contained breathing apparatus concept. Final report Oct 80-Jun 82
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, L.; Walker, J.
1982-08-01
Past operational experiences of USAF fire fighting and rescue teams have indicated the need for an improved self-contained breathing apparatus (SCBA). In October 1980, a contract was awarded to Electronic Data Systems, Panama City, Florida, to design and develop a prototype SCBA that would meet Air Force technical requirements. A prototype was designed, developed, and tested through a subcontract with Reimers Consultants, Falls Church, Virginia. This report describes the technical requirements, a detailed technical description of the unit, and the unmanned test procedures and results. The unmanned testing demonstrate that the prototype SCBA meets all performance requirements, except for weight.more » The fully charged prototype weights 34 pounds, the maximum acceptable weight is 30 pounds. With the other performance requirements either met or exceeded, manned testing of the SCBA can proceed.« less
Amorphous silicon research. Final technical progress report, 1 August 1994--28 February 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guha, S
1998-05-01
This report describes the status and accomplishments of work performed under this subcontract by United Solar Systems. United Solar researchers explored several new deposition regimes/conditions to investigate their effect on material/device performance. To facilitate optimum ion bombardment during growth, a large parameter space involving chamber pressure, rf power, and hydrogen dilution were investigated. United Solar carried out a series of experiments using discharge modulation at various pulsed-plasma intervals to study the effect of Si-particle incorporation on solar cell performance. Hydrogen dilution during deposition is found to improve both the initial and stable performance of a-Si and a-SiGe alloy cells. Researchersmore » conducted a series of temperature-ramping experiments on samples prepared with high and low hydrogen dilutions to study the effect of hydrogen effusion on solar cell performance. Using an internal photoemission method, the electrical bandgap of a microcrystalline p layer used in high-efficiency solar cells was measured to be 1.6 eV. New measurement techniques were developed to evaluate the interface and bulk contributions of losses to solar cell performance. Researchers replaced hydrogen with deuterium and found deuterated amorphous silicon alloy solar cells exhibit reduced light-induced degradation. The incorporation of a microcrystalline n layer in a multijunction cell is seen to improve cell performance. United Solar achieved a world-record single-junction a-Si alloy stable cell efficiency of 9.2% with an active area of 0.25 cm{sup 2} grown with high hydrogen dilution. They also achieved a world-record triple-junction, stable, active-area cell efficiency of 13.0% with an active area of 0.25 cm{sup 2}.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saccomanno, G.
''Early Lung Cancer Detection in Uranium Miners with Abnormal Sputum Cytology'' was funded by the Department of Energy to monitor the health effects of radon exposure and/or cigarette smoke on uranium workers from the Colorado Plateau. The resulting Saccomanno Uranium Workers Archive and data base has been used as a source of information to prove eligibility for compensation under the Radiation Exposure Compensation Act and as the source of primary data tissue for a subcontract and other collaborations with outside investigators. The latter includes a study of radon exposure and lung cancer risk in a non-smoking cohort of uranium minersmore » (subcontract); a study of genetic markers for lung cancer susceptibility; and a study of {sup 210}Pb accumulation in the skull as a biomarker of radon exposure.« less
48 CFR 970.5226-1 - Diversity plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...
48 CFR 44.202-2 - Considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... purchasing system or performance is inadequate; (2) Close working relationships or ownership affiliations... subcontracting with small, veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged and women...
75 FR 70031 - Antitrust Division
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
...) operate a branding program based upon distinctive trademarks to create high customer awareness of, demand... or subcontract a branding program; (vii) create printed and/or electronic materials for distribution...
Code of Federal Regulations, 2011 CFR
2011-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2014 CFR
2014-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2013 CFR
2013-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2012 CFR
2012-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
75 FR 33269 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... Procurement List: Product Wooden Trunk Locker NSN: 8460-00-243-3234. NPA: Employment Source, Inc... competitor enjoying a profitable subcontract forever if the commercial portion of the trunk locker...
40 CFR 35.938-9 - Subcontracts under construction contracts.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...
48 CFR 2052.215-75 - Proposal presentation and format.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., education, and employment history of its employees, subcontractor personnel, and consultants, through... and categories, materials, subcontracts, travel, computer time, etc., must be included so that the...
48 CFR 836.574 - Subcontracts and work coordination.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...
48 CFR 836.574 - Subcontracts and work coordination.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...
48 CFR 836.574 - Subcontracts and work coordination.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...
48 CFR 836.574 - Subcontracts and work coordination.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...
48 CFR 3019.705-1 - General support for the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705-1 General support for the program. In any...
Low-Activity Waste Pretreatment System Additional Engineering-Scale Integrated Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Landon, Matt R.; Wilson, Robert A.
Washington River Protections Solutions, LLC’s (WRPS) Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low-activity waste (ILAW) by feeding LAW directly from Tank Farms to the Waste Treatment and Immobilization Plant (WTP) LAW Facility, bypassing the WTP Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria (WAC). Full-scale and engineering-scale testing of critical technology elements, as part of the technology maturation process, are components of the overall LAWPS Project. WRPS awarded themore » engineering-scale integrated testing scope to AECOM via WRPS Subcontract 58349. This report is deliverable MSR-008 of the subcontract.« less
Opto-mechanical support services. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This subcontract was for Optomec`c support of the Los Alamos National Laboratory`s (LANL`s) Group MEE-12 in the technical specialty area of opto-mechanical design, engineering and fabrication. Two individual tasks were defined by MEE-12 and completed by Optomec personnel. Edward J. Yavornik acted as Principal Investigator on the Wire and Fluorescent Fiber Offset Grid (WAFFOG) for the Neutral Particle Beam (NPB) GTA (Ground Test Accelerator) Experiment, and Thomas Swann acted as Principal Investigator on the ESS-7 Photometers Project. Some hardware was procured/fabricated for the ESS-7 Photometer task, however, most of the work consisted of design and engineering support resulting in drawingsmore » and specifications which were prepared by MEE-12 personnel. There were no technical papers or patents generated by Optomec personnel as a result of this work, and all work defined in the contract was completed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steller, Robert; Diehl, John
2007-02-01
Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohaymore » serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Diehl, John; Steller, Robert
2007-03-20
Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohaymore » serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.« less
Integrated Dynamic Gloabal Modeling of Land Use, Energy and Economic Growth
DOE Office of Scientific and Technical Information (OSTI.GOV)
Atul Jain, University of Illinois, Urbana-Champaign, IL
2009-10-14
The overall objective of this collaborative project is to integrate an existing general equilibrium energy-economic growth model with a biogeochemical cycles and biophysical models in order to more fully explore the potential contribution of land use-related activities to future emissions scenarios. Land cover and land use change activities, including deforestation, afforestation, and agriculture management, are important source of not only CO2, but also non-CO2 GHGs. Therefore, contribution of land-use emissions to total emissions of GHGs is important, and consequently their future trends are relevant to the estimation of climate change and its mitigation. This final report covers the full projectmore » period of the award, beginning May 2006, which includes a sub-contract to Brown University later transferred to the National Center for Atmospheric Research (NCAR) when Co-PI Brian O'Neill changed institutional affiliations.« less
PWR steam generator chemical cleaning, Phase I. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rothstein, S.
1978-07-01
United Nuclear Industries (UNI) entered into a subcontract with Consolidated Edison Company of New York (Con Ed) on August 8, 1977, for the purpose of developing methods to chemically clean the secondary side tube to tube support crevices of the steam generators of Indian Point Nos. 1 and 2 PWR plants. This document represents the first reporting on activities performed for Phase I of this effort. Specifically, this report contains the results of a literature search performed by UNI for the purpose of determining state-of-the-art chemical solvents and methods for decontaminating nuclear reactor steam generators. The results of the searchmore » sought to accomplish two objectives: (1) identify solvents beyond those proposed at present by UNI and Con Ed for the test program, and (2) confirm the appropriateness of solvents and methods of decontamination currently in use by UNI.« less
Rutgers University Subcontract B611610 Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soundarajan, Sucheta; Eliassi-Rad, Tina; Gallagher, Brian
Given an incomplete (i.e., partially-observed) network, which nodes should we actively probe in order to achieve the highest accuracy for a given network feature? For example, consider a cyber-network administrator who observes only a portion of the network at time t and wants to accurately identify the most important (e.g., highest PageRank) nodes in the complete network. She has a limited budget for probing the network. Of all the nodes she has observed, which should she probe in order to most accurately identify the important nodes? We propose a novel and scalable algorithm, MaxOutProbe, and evaluate it w.r.t. four networkmore » features (largest connected component, PageRank, core-periphery, and community detection), five network sampling strategies, and seven network datasets from different domains. Across a range of conditions, MaxOutProbe demonstrates consistently high performance relative to several baseline strategies« less
Bioengineering aspects of inorganic carbon supply to mass algal cultures. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goldman, J.C.
1980-06-01
The work included in this report is part of an ongoing study (currently funded by the Solar Energy Research Institute - Subcontract No. XR-9-8144-1) on the inorganic carbon requirements of microalgae under mass culture conditions and covers the period June 1, 1978 through May 31, 1979. It is divided into two parts appended herein. The first part is a literature review on the inorganic carbon chemical system in relation to algal growth requirements, and the second part deals with the kinetics of inorganic carbon-limited growth of two freshwater chlorophytes including the effect of carbon limitation on cellular chemical composition. Additionalmore » experiment research covered under this contract was reported in the Proceedings of the 3rd Annual Biomass Energy Systems Conferences, pp. 25-32, Bioengineering aspects of inorganic carbon supply to mass algal cultures. Report No. SERI/TP-33-285.« less
Code of Federal Regulations, 2014 CFR
2014-10-01
... or subcontracts for work performed exclusively outside the United States. (b) Exemptions granted by... ability of the Government to procure goods and services on an economical and efficient basis or if special...
Code of Federal Regulations, 2010 CFR
2010-10-01
... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.401 Definitions. As used in this subpart— Price means cost plus any fee or profit applicable to the contract type. Subcontract (except as...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2012 CFR
2012-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2014 CFR
2014-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2013 CFR
2013-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2011 CFR
2011-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
42 CFR 480.120 - Information subject to disclosure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracts under those contracts (except for proprietary or business information); (3) Copies of documents..., including a study design and methodology. (b) Aggregate statistical information that does not implicitly or...
48 CFR 919.7011 - Developmental assistance.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Engineering and other technical assistance; (3) Noncompetitive award of subcontracts under DOE or other... activities; (5) Progress payments based on costs; (6) Rent-free use of facilities and/or equipment owned or...
48 CFR 36.501 - Performance of work by the contractor.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...
48 CFR 36.501 - Performance of work by the contractor.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...
48 CFR 36.501 - Performance of work by the contractor.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...
48 CFR 36.501 - Performance of work by the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...
48 CFR 36.501 - Performance of work by the contractor.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...
24 CFR 882.412 - Subcontracting of owner services.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR... HUD approval, rents which exceed the appropriate Moderate Rehabilitation Fair Market Rent for a unit...
48 CFR 1419.705-3 - Preparing the solicitation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...
48 CFR 1419.705-3 - Preparing the solicitation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...
48 CFR 1319.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...
48 CFR 1319.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...
49 CFR 22.11 - Eligibility criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business with experience in the transportation industry and trade for which the STLP loan is sought; (5) Be...-executed transportation-related contract, subcontract, or purchase order held directly with DOT or with...
A New Front in the Sweatshop Wars?
ERIC Educational Resources Information Center
Farrell, Elizabeth F.; Olsen, Florence
2001-01-01
Discusses how some prominent institutions prompt debate by subcontracting the labor-intensive work of putting documents online to vendors in developing countries. Libraries counter that contractors treat overseas employees well. (EV)
Code of Federal Regulations, 2010 CFR
2010-10-01
..., such as agricultural and food-aid shipments; (2) Shipments covered under 46 U.S.C. Appx 1241-1, such as those generated by Export-Import Bank loans or guarantees; (3) Subcontracts under— (i) Government...
Strontium-90 Error Discovered in Subcontract Laboratory Spreadsheet
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. D. Brown A. S. Nagel
1999-07-31
West Valley Demonstration Project health physicists and environment scientists discovered a series of errors in a subcontractor's spreadsheet being used to reduce data as part of their strontium-90 analytical process.
Novel polymer membrane process for pre-combustion CO{sub 2} capture from coal-fired syngas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Merkel, Tim
2011-09-14
This final report describes work conducted for the Department of Energy (DOE NETL) on development of a novel polymer membrane process for pre-combustion CO{sub 2} capture from coalfired syngas (award number DE-FE0001124). The work was conducted by Membrane Technology and Research, Inc. (MTR) from September 15, 2009, through December 14, 2011. Tetramer Technologies, LLC (Tetramer) was our subcontract partner on this project. The National Carbon Capture Center (NCCC) at Wilsonville, AL, provided access to syngas gasifier test facilities. The main objective of this project was to develop a cost-effective membrane process that could be used in the relatively near-term tomore » capture CO{sub 2} from shifted syngas generated by a coal-fired Integrated Gasification Combined Cycle (IGCC) power plant. In this project, novel polymeric membranes (designated as Proteus™ membranes) with separation properties superior to conventional polymeric membranes were developed. Hydrogen permeance of up to 800 gpu and H{sub 2}/CO{sub 2} selectivity of >12 was achieved using a simulated syngas mixture at 150°C and 50 psig, which exceeds the original project targets of 200 gpu for hydrogen permeance and 10 for H{sub 2}/CO{sub 2} selectivity. Lab-scale Proteus membrane modules (with a membrane area of 0.13 m{sup 2}) were also developed using scaled-up Proteus membranes and high temperature stable module components identified during this project. A mixed-gas hydrogen permeance of about 160 gpu and H{sub 2}/CO{sub 2} selectivity of >12 was achieved using a simulated syngas mixture at 150°C and 100 psig. We believe that a significant improvement in the membrane and module performance is likely with additional development work. Both Proteus membranes and lab-scale Proteus membrane modules were further evaluated using coal-derived syngas streams at the National Carbon Capture Center (NCCC). The results indicate that all module components, including the Proteus membrane, were stable under the field conditions (feed pressures: 150-175 psig and feed temperatures: 120-135°C) for over 600 hours. The field performance of both Proteus membrane stamps and Proteus membrane modules is consistent with the results obtained in the lab, suggesting that the presence of sulfur-containing compounds (up to 780 ppm hydrogen sulfide), saturated water vapor, carbon monoxide and heavy hydrocarbons in the syngas feed stream has no adverse effect on the Proteus membrane or module performance. We also performed an economic analysis for a number of membrane process designs developed in this project (using hydrogen-selective membranes, alone or in the combination with CO{sub 2}- selective membranes). The current field performance for Proteus membranes was used in the design analysis. The study showed the current best design has the potential to reduce the increase in Levelized Cost of Electricity (LCOE) caused by 90% CO{sub 2} capture to about 15% if co-sequestration of H{sub 2}S is viable. This value is still higher than the DOE target for increase in LCOE (10%); however, compared to the base-case Selexol process that gives a 30% increase in LCOE at 90% CO2 capture, the membrane-based process appears promising. We believe future improvements in membrane performance have the potential to reach the DOE target.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... Silicon Photovoltaic Cells and Modules From China; Scheduling of the Final Phase of Countervailing Duty... silicon photovoltaic cells and modules, provided for in subheadings 8501.31.80, 8501.61.00, 8507.20.80... photovoltaic cells, and modules, laminates, and panels, consisting of crystalline silicon photovoltaic cells...
Code of Federal Regulations, 2014 CFR
2014-10-01
... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...
Code of Federal Regulations, 2012 CFR
2012-10-01
... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...
Code of Federal Regulations, 2013 CFR
2013-10-01
... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...
48 CFR 52.222-11 - Subcontracts (Labor Standards).
Code of Federal Regulations, 2014 CFR
2014-10-01
... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... contract); (3) Apprentices and Trainees; (4) Payrolls and Basic Records; (5) Compliance with Copeland Act...
International Business Machines (IBM) Corporation Interim Agreement EPA Case No. 08-0113-00
On March 27, 2008, the United States Environmental Protection Agency (EPA), suspended International Business Machines (IBM) from receiving Federal Contracts, approved subcontracts, assistance, loans and other benefits.
48 CFR 226.370-8 - Goals and incentives for subcontracting with HBCU/MIs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Historically Black Colleges and Universities and Minority Institutions 226.370-8 Goals and incentives for... educational institutions. (b) The contracting officer may, when contracting by negotiation, use in...
78 FR 42391 - Small Business Subcontracting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-16
... for the Jobs Act was the belief that contracting officers and prime contractors are not reporting or... for making false claims. SBA notes that the requirements that apply in the construction arena do not...
Upcoming Purchasing and Subcontracting Opportunities | NREL
Services Fall 2022 Construction@nrel.gov Design-Build and Construction Spring 2018 Construction@nrel.gov Design-Build for Minor Construction Spring 2020 Construction@nrel.gov Testing of Fuel and Oil Samples
Code of Federal Regulations, 2010 CFR
2010-10-01
... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...
Code of Federal Regulations, 2011 CFR
2011-10-01
... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... which the apparently successful offeror received an evaluation credit for proposing one or more SDB... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
36 CFR 14.9 - Terms and conditions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... employees of the contractors, and to indemnify the United States against any liability for damages to life..., or national origin and shall require an identical provision to be included in all subcontracts. (l...
48 CFR 852.236-80 - Subcontracts and work coordination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... immediately. In doing so, the contractor shall explain the proposed method of solving the problem or shall... problems and the installation of lines and equipment as contemplated by the contract documents while...
48 CFR 227.7102-3 - Contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... processes. Do not require the contractor to include this clause in its subcontracts. (2) Use the clause at... for commercial items or commercial components. (c) Use the clause at 252.227-7037, Validation of...
Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nguyen, Ba Nghiep; Simmons, Kevin L.
This quarterly report summarizes the status for the project planning to complete all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the second quarter (1/1/2013 to 3/31/2013), all the technical and legal documents for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. The revised CRADA documents were sent to DOE, Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for completing legal documents for the project. A non-disclosure agreement was revised and sent to all the parties for reviews.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nguyen, Ba Nghiep; Simmons, Kevin L.
This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.« less
4 CFR 21.13 - Nonstatutory protests.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...
4 CFR 21.13 - Nonstatutory protests.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...
48 CFR 52.222-11 - Subcontracts (Labor Standards).
Code of Federal Regulations, 2010 CFR
2010-10-01
... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...
48 CFR 52.222-11 - Subcontracts (Labor Standards).
Code of Federal Regulations, 2012 CFR
2012-10-01
... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...
48 CFR 52.222-11 - Subcontracts (Labor Standards).
Code of Federal Regulations, 2013 CFR
2013-10-01
... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...
48 CFR 52.222-11 - Subcontracts (Labor Standards).
Code of Federal Regulations, 2011 CFR
2011-10-01
... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...
48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123...
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).
Code of Federal Regulations, 2012 CFR
2012-01-01
... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).
Code of Federal Regulations, 2013 CFR
2013-01-01
... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...
48 CFR 252.225-7046 - Exports by Approved Community Members in Response to the Solicitation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... all applicable International Traffic in Arms Regulations (ITAR) requirements, including any criminal.../Title of Duly Authorized RepresentativeDate (h) Subcontracts. The offeror shall flow down the substance...
7 CFR 2500.049 - Prior approvals.
Code of Federal Regulations, 2013 CFR
2013-01-01
... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...
7 CFR 2500.049 - Prior approvals.
Code of Federal Regulations, 2014 CFR
2014-01-01
... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...
7 CFR 2500.049 - Prior approvals.
Code of Federal Regulations, 2012 CFR
2012-01-01
... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-2... production of an item or process begun as a prototype project under an other transaction agreement or as a...
Code of Federal Regulations, 2010 CFR
2010-10-01
... SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7101 Purpose. The VA Mentor-Protégé Program is... businesses (VOSBs) in enhancing their capabilities to perform contracts and subcontracts for VA. The Mentor...
48 CFR 2944.302 - Requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...
48 CFR 2944.302 - Requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...
48 CFR 2944.302 - Requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Requirements. 2944.302 Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 2944.302 Requirements. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-09
... terrorism or other man-made disaster. DATES: Comments and related material submitted electronically must be... from a natural disaster or act of terrorism or other man-made disaster. Congress enacted this...
Illinois Institute of Technology Report: IITB52 Antifoamer for Alternative Salt Processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, D.P.
2001-06-27
The attached report is a summary of the work performed by Dr. Darsh Wasan, Dr. Alex Nikolov, and their researchers at the Illinois Institute of Technology (IIT) during FY01. IIT developed the IITB52 antifoam for SRTC in FY00 to minimize the foam produced during precipitation, washing and concentration of cesium and potassium tetraphenyl borate precipitate. The IITB52 antifoam has been very successful during continuous processing (prototypical of plant operation). However, there were several key issues where SRTC needed the experience and knowledge of IIT to resolve. As a result a subcontract was set up with Dr. Wasan and Dr. Alexmore » Nikolov during FY01. This subcontract requested IIT to perform the basic research necessary to understand the foaming mechanism and explain the effectiveness of the IITB52 antifoam agent in the Small Tank Tetraphenylborate Process (STTP).« less
The nexus between OSH and subcontracting.
Nunes, Isabel L
2012-01-01
Subcontracting of specialized functions to external companies (e.g. cleaning or maintenance) is actually very common within several industries. These external companies' are called contractors and their contracting is often designated as outsourcing. Frequently contractors involve other companies (the sub-contractors) to assist them in fulfilling the contract, resulting in a complex chain of organizations focused on interchange of work - the contracting chain. Therefore in the same work site can coexist workers form the client-company and workers from the contractors and/or subcontractors. Since contractors perform their job in client's facilities, they can be exposed to hazards that are unknown to them. On other hand, workers of the client company can also be exposed to hazardous situations derived from the work performed by the contractors. The paper discusses how adequate occupational safety and health conditions can be assured when dealing with this kind of dynamic labor networks. Two case-studies and several examples coming from international literature will be presented.
Management of optics. [for HEAO-2 X ray telescope
NASA Technical Reports Server (NTRS)
Kirchner, T. E.; Russell, M.
1981-01-01
American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Delahoy, A. E.; Chen, L.
2004-05-01
The objective of this subcontract is to develop and integrate the various pieces of new technology that EPV considers enabling for cost-effective production of CIGS modules. EPV has conducted research to help generate a technology base for production of CIGS PV modules using vacuum deposition of CIGS onto glass. This strategy is consistent with the observation that, despite there being several approaches to forming device-quality CIGS, vacuum deposition has maintained the world record for the highest-efficiency CIGS device. A record thin-film solar cell efficiency of 19.2% (with Ni-Al grid and MgF2 ARC) for a 0.41-cm2 device was achieved by NRELmore » in 2003 using vacuum-deposited CIGS. The deposition employed four point sources and detection of the Cu-poor to Cu-rich transition for process control. To extend this type of processing to the realm of large-area substrates, EPV developed vacuum equipment designed for heating and coating 0.43-m2 moving substrates, with a projected further scale up to 0.79 m2. The substrates are typically low-cost, soda-lime glass, and the materials are supplied to the moving substrates using novel linear-source technology developed by EPV. The use of elemental selenium rather than toxic H2Se gas helps make for a safe manufacturing environment. These choices concerning film deposition, substrates, and source materials help to minimize the processing costs of CIGS.« less
Kim, Ja Young; Lee, Joohee; Muntaner, Carles; Kim, Seung-Sup
2016-10-01
This study sought to examine whether nonstandard employment is associated with presenteeism as well as absenteeism among full-time employees in South Korea. We analyzed a cross-sectional survey of 26,611 full-time employees from the third wave of the Korean Working Conditions Survey in 2011. Experience of absenteeism and presenteeism during the past 12 months was assessed through self-reports. Employment condition was classified into six categories based on two contract types (parent firm and subcontract) and three contract durations [permanent (≥1 year, no fixed term), long term (≥1 year, fixed term), and short term (<1 year, fixed term)]. We found opposite trends between the association of nonstandard employment with absenteeism and presenteeism after adjusting for covariates. Compared to parent firm-permanent employment, which has been often regarded as a standard employment, absenteeism was not associated or negatively associated with all nonstandard employment conditions except parent firm-long term employment (OR 1.88; 95 % CI 1.57, 2.26). However, presenteeism was positively associated with parent firm-long term (OR 1.64; 95 % CI 1.42, 1.91), subcontract-long term (OR 1.61; 95 % CI 1.12, 2.32), and subcontract-short term (OR 1.26; 95 % CI 1.02, 1.56) employment. Our results found that most nonstandard employment may increase risk of presenteeism, but not absenteeism. These results suggest that previous findings about the protective effects of nonstandard employment on absenteeism may be explained by nonstandard workers being forced to work when sick.
Subcontractors and increased risk for work-related diseases and absenteeism.
Min, Kyoung B; Park, Shin G; Song, Jae S; Yi, Kwan H; Jang, Tae W; Min, Jin Y
2013-11-01
Despite increasing reliance on subcontracting in many economic sectors, there is little information available on occupational health and safety issues among subcontractor employees. The purpose of this study was to investigate the effect of subcontracting on self-reported health problems and absences due to occupational accidents and sickness using a nationally representative sample from South Korea. The data used were sampled from the second wave of the Korean Working Conditions Survey [2010]. Information on 3,282 parent firm employees and 728 subcontractor employees was obtained. For the logistic regression model, the outcomes were work-related health problems and absenteeism. The independent variables were personal and occupational characteristics, job aspects, and working hazards. Subcontractor employees were significantly more likely to experience health problems than the employee at parent firms. In particular, subcontractors' risk of injuries and anxiety/depression increased twofold (odd ratios, OR=2.01, 95% confidence interval, CIs, 1.24-3.26) and threefold (OR=2.95, 95% CIs 1.52-5.73), respectively, after controlling for potential variables. In addition, subcontractor employees were three times more likely than employees at parent firms to miss work due to illness (OR=3.56; 95% CIs 2.02-6.26). Working conditions, especially those related to job aspects and workplace exposures, attenuated these risks. Subcontracting workers were found to have a higher risk of work-related diseases and a higher absenteeism rate than parent firm workers. Our study highlights the need to protect and improve the occupational health and safety of subcontractor employees. Copyright © 2013 Wiley Periodicals, Inc.
48 CFR 644.302 - Requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...
48 CFR 644.302 - Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Requirements. 44.302 Section 44.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.302 Requirements. (a) The ACO...
48 CFR 644.302 - Requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...
48 CFR 644.302 - Requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...
48 CFR 1344.302 - Requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Requirements. 1344.302 Section 1344.302 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews § 1344.302 Requirements. The...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Requirements. 44.302 Section 44.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.302 Requirements. (a) The ACO...
48 CFR 644.302 - Requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Requirements. 644.302 Section 644.302 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Contractor's Purchasing System Reviews 644.302 Requirements. (a) The...
20 CFR 632.35 - Native American grantee contracts and subgrants.
Code of Federal Regulations, 2011 CFR
2011-04-01
... contract or subgrant shall be given to qualified Indians regardless of age, religion or sex and that the... paragraph in all subcontracts and subgrants made by them (sec. 7(b) of the Indian Self-Determination and...
20 CFR 632.35 - Native American grantee contracts and subgrants.
Code of Federal Regulations, 2012 CFR
2012-04-01
... contract or subgrant shall be given to qualified Indians regardless of age, religion or sex and that the... paragraph in all subcontracts and subgrants made by them (sec. 7(b) of the Indian Self-Determination and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...
48 CFR 370.202 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 370.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES HHS SUPPLEMENTATIONS SPECIAL PROGRAMS AFFECTING ACQUISITION Indian Preference in Employment, Training, and Subcontracting... with Indian organizations; or (2) The work to be performed is specifically for the benefit of Indians...
48 CFR 370.205 - Tribal preference requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requirements. 370.205 Section 370.205 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES HHS SUPPLEMENTATIONS SPECIAL PROGRAMS AFFECTING ACQUISITION Indian Preference in Employment, Training, and Subcontracting Opportunities 370.205 Tribal preference requirements. (a) When the contractor will perform work...
48 CFR 1419.705-6 - Postaward responsibilities of the contracting officer.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracting program. Reviews shall be conducted as required based on problems perceived such as insufficient... format shown at 1453.303-70. At the discretion of the CO, the BUDS may conduct the reviews. In addition...
48 CFR 19.705-2 - Determining the need for a subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performance of part of the work or maintain sufficient in-house capability to perform the work; (2) Whether... business, and women-owned small business concerns to participate, and the burden placed on offerors. (e) A...
48 CFR 19.705-2 - Determining the need for a subcontracting plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... performance of part of the work or maintain sufficient in-house capability to perform the work; (2) Whether... business, and women-owned small business concerns to participate, and the burden placed on offerors. (e) A...
20 CFR 632.35 - Native American grantee contracts and subgrants.
Code of Federal Regulations, 2010 CFR
2010-04-01
... paragraph in all subcontracts and subgrants made by them (sec. 7(b) of the Indian Self-Determination and... contract or subgrant shall be given to qualified Indians regardless of age, religion or sex and that the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... Uniform Crime Reporting. CCI will subcontract with a professional survey research firm to administer the survey. (5) An estimate of the total number of respondents and the amount of time estimated for an...
48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... (TAS) as reported in FPDS. (xiv) The applicable North American Industry Classification System code... filings at http://www.sec.gov/answers/execomp.htm.) (e) The Contractor shall not split or break down first...
48 CFR 19.702 - Statutory requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business, HUBZone small business, small disadvantaged business, and women-owned small business concerns..., HUBZone small business, small disadvantaged business, and women-owned small business concerns. (a) Except... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.702 Statutory requirements...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... Life Cycle of Major Defense Acquisition Programs (DFARS Case 2009-D014) AGENCY: Defense Acquisition... competition at both the prime contract and subcontract level of the MDAP throughout its life cycle as a means...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Defense Procurement and Acquisition Policy (Contract Policy and International Contracting), ((703) 697... DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Other International Agreements and Coordination 225.872... for reciprocal “no-cost” audits of contracts and subcontracts (pre- and post-award). (b) To determine...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to.... 2533b, Requirement to buy strategic materials critical to national security from American sources, is...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to.... 2533b, Requirement to buy strategic materials critical to national security from American sources, is...
75 FR 53129 - Federal Acquisition Regulation; Inflation Adjustment of Acquisition-Related Thresholds
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
... contractors pay very low wages and benefits, work quality can suffer and the Government may bear hidden costs because of the need to provide income assistance to low income families. The threshold for subcontracting...
Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling
NASA Astrophysics Data System (ADS)
Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata
2017-10-01
Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is not allowed to take longer) and maximum total value of subcontracted work. The problem is modelled as a mixed binary linear program that minimizes project cost. It can be solved using universal solvers (e.g. LINGO, AIMMS, CPLEX, MATLAB and Optimization Toolbox, etc.). However, developing a dedicated decision-support tool would facilitate practical applications. To illustrate the idea of the model, the authors present a numerical example to find the optimal set of resources allocated to a project.
Process development for automated solar cell and module production. Task 4: Automated array assembly
NASA Technical Reports Server (NTRS)
Hagerty, J. J.
1981-01-01
Progress in the development of automated solar cell and module production is reported. The unimate robot is programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. The mechanical construction of the automated lamination station and final assembly station phases are completed and the first operational testing is underway. The final controlling program is written and optimized. The glass reinforced concrete (GRC) panels to be used for testing and deliverables are in production. Test routines are grouped together and defined to produce the final control program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schauder, C.
This subcontract report was completed under the auspices of the NREL/SCE High-Penetration Photovoltaic (PV) Integration Project, which is co-funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) and the California Solar Initiative (CSI) Research, Development, Demonstration, and Deployment (RD&D) program funded by the California Public Utility Commission (CPUC) and managed by Itron. This project is focused on modeling, quantifying, and mitigating the impacts of large utility-scale PV systems (generally 1-5 MW in size) that are interconnected to the distribution system. This report discusses the concerns utilities have when interconnecting large PV systems thatmore » interconnect using PV inverters (a specific application of frequency converters). Additionally, a number of capabilities of PV inverters are described that could be implemented to mitigate the distribution system-level impacts of high-penetration PV integration. Finally, the main issues that need to be addressed to ease the interconnection of large PV systems to the distribution system are presented.« less
Hydroacoustic propagation grids for the CTBT knowledge databaes BBN technical memorandum W1303
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. Angell
1998-05-01
The Hydroacoustic Coverage Assessment Model (HydroCAM) has been used to develop components of the hydroacoustic knowledge database required by operational monitoring systems, particularly the US National Data Center (NDC). The database, which consists of travel time, amplitude correction and travel time standard deviation grids, is planned to support source location, discrimination and estimation functions of the monitoring network. The grids will also be used under the current BBN subcontract to support an analysis of the performance of the International Monitoring System (IMS) and national sensor systems. This report describes the format and contents of the hydroacoustic knowledgebase grids, and themore » procedures and model parameters used to generate these grids. Comparisons between the knowledge grids, measured data and other modeled results are presented to illustrate the strengths and weaknesses of the current approach. A recommended approach for augmenting the knowledge database with a database of expected spectral/waveform characteristics is provided in the final section of the report.« less
Making medicine a business in Japan: Shimadzu Co. and the diffusion of radiology (1900-1960).
Donzé, Pierre-Yves
2010-01-01
This contribution focuses on the role of the firm Shimadzu in the marketing of X-ray machines in Japan during the first part of the 20th century, viewed from a business history perspective. It attempts to further understanding of the process of technology diffusion in medicine. In a global market controlled by American and German multinational enterprises, Japan appears to have been a particular country, where a domestic independent firm, Shimadzu, succeeded in establishing itself as a competitive company. This success is the result of a strategy based on both the internalisation of technological capabilities (recruitment of university graduate engineers, subcontracting of research and development activities) and an original communication policy towards the medical world. Finally, the specific structure of the Japanese medical market, composed of numerous and largely privatised small healthcare centres, facilitated the rapid diffusion of X-ray machines, a new technology which conferred a comparative advantage on its holders.
Extraction studies. Final report, May 6, 1996--September 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
During the first week of this effort, an Alpkem RFA-300 4-channel automated chemical analyzer was transferred to the basement of building 42 at TA-46 for the purpose of performing extraction studies. Initially, this instrumentation was applied to soil samples known to contain DNA. Using the SFA (Segmented Flow Analysis) technique, several fluidic systems were evaluated to perform on-line filtration of several varieties of soil obtained from Cheryl Kuske and Kaysie Banton (TA-43, Bldg. 1). Progress reports were issued monthly beginning May 15, 1996. Early in 1997 there was a shift from the conventional 2-phase system (aqueous + air) to amore » 3-phase system (oil + aqueous + air) to drastically reduce sample size and reagent consumption. Computer animation was recorded on videotape for presentations. The time remaining on the subcontract was devoted to setting up existing equipment to incorporate the 3rd phase (a special fluorocarbon oil obtained from DuPont).« less
Laboratory and Space Plasma Studies
NASA Astrophysics Data System (ADS)
Hyman, Ellis
1996-08-01
The work performed by Science Applications International Corporation (SAIC), encompasses a wide range of topics in experimental, computational, and analytical laboratory and space plasma physics. The accomplishments described in this report have been in support of the programs of the Laser Plasma Branch (Code 6730) and other segments of the Plasma Physics Division at the Naval Research Laboratory (NRL) and cover the period 27 September 1993 to August 1, 1996. SAIC's efforts have been supported by sub-contracts or consulting agreements with Pulse Sciences, Inc., Clark Richardson, and Biskup Consulting Engineers, Pharos Technical Enterprises, Plex Corporation, Cornell University, Stevens Institute of Technology, the University of Connecticut, Plasma Materials and Technologies, Inc., and GaSonics International, Inc. In the following discussions section we will describe each of the topics investigated and the results obtained. Much of the research work has resulted in journal publications and NRL Memorandum Reports in which the investigation is described in detail. These reports are included as Appendices to this Final Report.
Final Report: Subcontract B623868 Algebraic Multigrid solvers for coupled PDE systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brannick, J.
The Pennsylvania State University (“Subcontractor”) continued to work on the design of algebraic multigrid solvers for coupled systems of partial differential equations (PDEs) arising in numerical modeling of various applications, with a main focus on solving the Dirac equation arising in Quantum Chromodynamics (QCD). The goal of the proposed work was to develop combined geometric and algebraic multilevel solvers that are robust and lend themselves to efficient implementation on massively parallel heterogeneous computers for these QCD systems. The research in these areas built on previous works, focusing on the following three topics: (1) the development of parallel full-multigrid (PFMG) andmore » non-Galerkin coarsening techniques in this frame work for solving the Wilson Dirac system; (2) the use of these same Wilson MG solvers for preconditioning the Overlap and Domain Wall formulations of the Dirac equation; and (3) the design and analysis of algebraic coarsening algorithms for coupled PDE systems including Stokes equation, Maxwell equation and linear elasticity.« less
48 CFR 22.603 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act 22.603 Applicability. The requirements in 22.602 apply to contracts (including for this purpose, indefinite-delivery contracts, basic ordering agreements, and blanket purchase agreements) and subcontracts under Section 8(a...