Sample records for monitor units required

  1. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Wastewater-Inspection and Monitoring... and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection or monitoring Method Tanks: 63.133(b)(1) Inspect fixed roof and all...

  2. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Wastewater-Inspection and Monitoring... and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection or monitoring Method Tanks: 63.133(b)(1) Inspect fixed roof and all...

  3. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Wastewater-Inspection and Monitoring... and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection or monitoring Method Tanks: 63.133(b)(1) Inspect fixed roof and all...

  4. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Wastewater-Inspection and Monitoring... and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection or monitoring Method Tanks: 63.133(b)(1) Inspect fixed roof and all...

  5. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Wastewater-Inspection and Monitoring..., Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection...

  6. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Wastewater-Inspection and Monitoring..., Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection...

  7. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 12 2014-07-01 2014-07-01 false Wastewater-Inspection and Monitoring... Production Pt. 63, Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of...

  8. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 12 2013-07-01 2013-07-01 false Wastewater-Inspection and Monitoring... Production Pt. 63, Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring requirement Frequency of...

  9. 40 CFR 60.1320 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... municipal waste combustion unit? 60.1320 Section 60.1320 Protection of Environment ENVIRONMENTAL PROTECTION... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... Monitoring Requirements § 60.1320 How do I monitor the load of my municipal waste combustion unit? (a) If...

  10. 40 CFR 60.1320 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... municipal waste combustion unit? 60.1320 Section 60.1320 Protection of Environment ENVIRONMENTAL PROTECTION... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... Monitoring Requirements § 60.1320 How do I monitor the load of my municipal waste combustion unit? (a) If...

  11. 40 CFR 60.1320 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... municipal waste combustion unit? 60.1320 Section 60.1320 Protection of Environment ENVIRONMENTAL PROTECTION... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... Monitoring Requirements § 60.1320 How do I monitor the load of my municipal waste combustion unit? (a) If...

  12. 40 CFR 60.1320 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... municipal waste combustion unit? 60.1320 Section 60.1320 Protection of Environment ENVIRONMENTAL PROTECTION... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... Monitoring Requirements § 60.1320 How do I monitor the load of my municipal waste combustion unit? (a) If...

  13. 40 CFR 60.1320 - How do I monitor the load of my municipal waste combustion unit?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... municipal waste combustion unit? 60.1320 Section 60.1320 Protection of Environment ENVIRONMENTAL PROTECTION... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... Monitoring Requirements § 60.1320 How do I monitor the load of my municipal waste combustion unit? (a) If...

  14. Evaluating the Use of Tissue Oximetry to Decrease Intensive Unit Monitoring for Free Flap Breast Reconstruction.

    PubMed

    Ricci, Joseph A; Vargas, Christina R; Ho, Olivia A; Lin, Samuel J; Tobias, Adam M; Lee, Bernard T

    2017-07-01

    Postoperative free flap care has historically required intensive monitoring for 24 hours in an intensive care unit. Continuous monitoring with tissue oximetry has allowed earlier detection of vascular compromise, decreasing flap loss and improving salvage. This study aims to identify whether a fast-track postoperative paradigm can be safely used with tissue oximetry to decrease intensive monitoring and costs. All consecutive microsurgical breast reconstructions performed at a single institution were reviewed (2008-2014) and cases requiring return to the operating room were identified. Data evaluated included patient demographics, the take back time course, and complications of flap loss and salvage. A cost-benefit analysis was performed to analyse the utility of a postoperative intensive monitoring setting. There were 900 flaps performed and 32 required an unplanned return to the operating room. There were 16 flaps that required a reexploration within the first 24 hours; the standard length of intensive unit monitoring. After 4 hours, there were 7 flaps (44%) detected by tissue oximetry for reexploration. After 15 hours of intensive monitoring postoperatively, cost analysis revealed that the majority (15/16; 94%) of failing flaps had been identified and the cost of identifying each subsequent failing flap exceeded the cost of another hour of intensive monitoring. The postoperative paradigm for microsurgical flaps has historically required intensive unit monitoring. Using tissue oximetry, a fast-track pathway can reduce time spent in an intensive monitoring setting from 24 to 15 hours with significant cost savings and minimal risk of missing a failing free flap.

  15. 40 CFR 60.4176 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Additional requirements to provide heat... Compliance Times for Coal-Fired Electric Steam Generating Units Monitoring and Reporting § 60.4176 Additional requirements to provide heat input data. The owner or operator of a Hg Budget unit that monitors and reports Hg...

  16. 40 CFR 60.4176 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Additional requirements to provide heat... requirements to provide heat input data. The owner or operator of a Hg Budget unit that monitors and reports Hg... monitor and report heat input rate at the unit level using the procedures set forth in part 75 of this...

  17. US Environmental rotection Agency's strategy for ground-water-quality monitoring at hazardous-waste land-disposal facilities located in karst terranes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, M.S.

    1988-11-01

    Ground-water monitoring of hazardous-waste land-disposal units by a network of wells is ineffective when located in karstic terranes. The U.S. Environmental Protection Agency (EPA) is currently proposing to modify its current ground-water-quality monitoring requirement of one upgradient well and three downgradient wells for disposal units located in karstic terranes. The convergent nature of subsurface flow to cave streams in karstic terranes requires that effective monitoring wells intercept the cave streams. Wells located around a hazardous-waste disposal unit, but not in the specific cave stream draining the site, are only providing irrelevant data and a false sense of security because themore » water samples from such wells are not necessarily from the hazardous-waste disposal unit. A case study is provided in this paper. EPA is drafting a guidance document that will allow monitoring by wells, only if the up- and down-gradient wells can be demonstrated to be hydraulically connected by means of dye-trace studies. If not, then the monitoring of springs shown to be hydraulically connected to the facility by dye-tracing studies would be required. Monitoring for sinkhole development will also be required to provide advance warning of sinkhole collapse. The investigation and determination of the probability of sinkhole collapse is given special treatment.« less

  18. 40 CFR 60.4905 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... malfunctions, or required monitoring system quality assurance or control activities conducted during monitoring... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What are the monitoring and calibration... SOURCES Standards of Performance for New Sewage Sludge Incineration Units Performance Testing, Monitoring...

  19. 40 CFR 60.4905 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... malfunctions, or required monitoring system quality assurance or control activities conducted during monitoring... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What are the monitoring and calibration... SOURCES Standards of Performance for New Sewage Sludge Incineration Units Performance Testing, Monitoring...

  20. 40 CFR 60.4905 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... malfunctions, or required monitoring system quality assurance or control activities conducted during monitoring... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What are the monitoring and calibration... SOURCES Standards of Performance for New Sewage Sludge Incineration Units Performance Testing, Monitoring...

  1. 40 CFR 60.4905 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... malfunctions, or required monitoring system quality assurance or control activities conducted during monitoring... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What are the monitoring and calibration... SOURCES Standards of Performance for New Sewage Sludge Incineration Units Performance Testing, Monitoring...

  2. 40 CFR 63.864 - Monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that uses an air pollution control system other than an ESP, wet scrubber, RTO, or fabric filter must... unit equipped with an alternative air pollution control system and monitoring operating parameters... affected source or process unit equipped with an alternative air pollution control system and monitoring...

  3. 40 CFR 63.864 - Monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that uses an air pollution control system other than an ESP, wet scrubber, RTO, or fabric filter must... unit equipped with an alternative air pollution control system and monitoring operating parameters... affected source or process unit equipped with an alternative air pollution control system and monitoring...

  4. 40 CFR 63.864 - Monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that uses an air pollution control system other than an ESP, wet scrubber, RTO, or fabric filter must... unit equipped with an alternative air pollution control system and monitoring operating parameters... affected source or process unit equipped with an alternative air pollution control system and monitoring...

  5. 40 CFR 60.5407 - What are the requirements for monitoring of emissions and operations from my sweetening unit...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... concentration in the acid gas from the sweetening unit for each 24-hour period. At least one sample per 24-hour... sampling schedule. (3) The average acid gas flow rate from the sweetening unit. You must install and operate a monitoring device to continuously measure the flow rate of acid gas. The monitoring device...

  6. 40 CFR 60.5407 - What are the requirements for monitoring of emissions and operations from my sweetening unit...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... concentration in the acid gas from the sweetening unit for each 24-hour period. At least one sample per 24-hour... sampling schedule. (3) The average acid gas flow rate from the sweetening unit. You must install and operate a monitoring device to continuously measure the flow rate of acid gas. The monitoring device...

  7. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... on the remote afterloader unit, on the control console, and in the facility; (3) Viewing and intercom... monitors used to indicate room exposures; (6) Source positioning (accuracy); and (7) Radiation monitors...

  8. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  9. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  10. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  11. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  12. 40 CFR 63.764 - General standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in paragraphs (c)(1) through (3) of this section. (1) For each glycol dehydration unit process vent... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The owner or operator shall... requirements for glycol dehydration unit process vents specified in § 63.765; (ii) The monitoring requirements...

  13. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  14. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  15. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  16. 40 CFR 60.5225 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SOURCES Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units Model Rule... monitoring system according to your monitoring plan required under § 60.4880. Additionally: (i) For carrier gas flow rate monitors (for activated carbon injection), during the performance test conducted...

  17. 40 CFR 75.74 - Annual and ozone season monitoring and reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... owner or operator of an affected unit subject both to an Acid Rain emission limitation and to a State or... State or federal NOX mass reduction program that adopts the provisions of this part and that requires...-diluent monitoring system, each flow rate monitoring system, each moisture monitoring system and each...

  18. 77 FR 36488 - Proposed Information Collection; Comment Request; Vessel Monitoring System Requirements Under the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Proposed Information Collection; Comment Request; Vessel Monitoring System Requirements Under the Western and Central Pacific...-fixing transmitters (``Vessel Monitoring System-VMS-units'') at all times except when the vessel is in...

  19. Implementation of a Portable Personal EKG Signal Monitoring System

    NASA Astrophysics Data System (ADS)

    Tan, Tan-Hsu; Chang, Ching-Su; Chen, Yung-Fu; Lee, Cheng

    This research develops a portable personal EKG signal monitoring system to help patients monitor their EKG signals instantly to avoid the occurrence of tragedies. This system is built with two main units: signal pro-cessing unit and monitoring and evaluation unit. The first unit consists of EKG signal sensor, signal amplifier, digitalization circuit, and related control circuits. The second unit is a software tool developed on an embedded Linux platform (called CSA). Experimental result indicates that the proposed system has the practical potential for users in health monitoring. It is demonstrated to be more convenient and with greater portability than the conventional PC-based EKG signal monitoring systems. Furthermore, all the application units embedded in the system are built with open source codes, no licensed fee is required for operating systems and authorized applications. Thus, the building cost is much lower than the traditional systems.

  20. An assessment of seismic monitoring in the United States; requirement for an Advanced National Seismic System

    USGS Publications Warehouse

    ,

    1999-01-01

    This report assesses the status, needs, and associated costs of seismic monitoring in the United States. It sets down the requirement for an effective, national seismic monitoring strategy and an advanced system linking national, regional, and urban monitoring networks. Modernized seismic monitoring can provide alerts of imminent strong earthquake shaking; rapid assessment of distribution and severity of earthquake shaking (for use in emergency response); warnings of a possible tsunami from an offshore earthquake; warnings of volcanic eruptions; information for correctly characterizing earthquake hazards and for improving building codes; and data on response of buildings and structures during earthquakes, for safe, cost-effective design, engineering, and construction practices in earthquake-prone regions.

  1. 40 CFR 264.97 - General ground-water monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... collection of ground-water samples. The annular space (i.e., the space between the bore hole and well casing... 40 Protection of Environment 27 2013-07-01 2013-07-01 false General ground-water monitoring... FACILITIES Releases From Solid Waste Management Units § 264.97 General ground-water monitoring requirements...

  2. 40 CFR 60.3044 - Is there a minimum amount of operating parameter monitoring data I must obtain?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... checks and required zero and span adjustments of the monitoring system), you must conduct all monitoring.... An operating day is any day the unit combusts any municipal or institutional solid waste. (c) If you...

  3. 40 CFR 60.3044 - Is there a minimum amount of operating parameter monitoring data I must obtain?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... checks and required zero and span adjustments of the monitoring system), you must conduct all monitoring.... An operating day is any day the unit combusts any municipal or institutional solid waste. (c) If you...

  4. 40 CFR 60.3044 - Is there a minimum amount of operating parameter monitoring data I must obtain?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... checks and required zero and span adjustments of the monitoring system), you must conduct all monitoring.... An operating day is any day the unit combusts any municipal or institutional solid waste. (c) If you...

  5. 40 CFR 60.3044 - Is there a minimum amount of operating parameter monitoring data I must obtain?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... checks and required zero and span adjustments of the monitoring system), you must conduct all monitoring.... An operating day is any day the unit combusts any municipal or institutional solid waste. (c) If you...

  6. 40 CFR 60.3044 - Is there a minimum amount of operating parameter monitoring data I must obtain?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... checks and required zero and span adjustments of the monitoring system), you must conduct all monitoring.... An operating day is any day the unit combusts any municipal or institutional solid waste. (c) If you...

  7. 40 CFR 63.1274 - General standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of an affected source (i.e., glycol dehydration unit) located at an existing or new major source of... requirements for glycol dehydration unit process vents specified in § 63.1275; (2) The monitoring requirements...

  8. 40 CFR 63.1274 - General standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of an affected source (i.e., glycol dehydration unit) located at an existing or new major source of... requirements for glycol dehydration unit process vents specified in § 63.1275; (2) The monitoring requirements...

  9. Development of a reference Phasor Measurement Unit (PMU) for the monitoring and control of grid stability and quality

    NASA Astrophysics Data System (ADS)

    Ndilimabaka, Hervé; Blanc, Isabelle

    2014-08-01

    This paper discusses the details of the development of a Phasor Measurement Unit regarding the requirements of the IEEE C37.118-2005 synchrophasor standard relative to steady-state conditions on grid monitoring and control. This phasor measurement unit is intended to be used for field tests sooner.

  10. 40 CFR 60.1735 - Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... appendix F requirements to evaluate continuous emission monitoring systems? 60.1735 Section 60.1735... Combustion Units Constructed on or Before August 30, 1999 Model Rule-Continuous Emission Monitoring § 60.1735... to also evaluate your oxygen (or carbon dioxide) continuous emission monitoring system. Therefore...

  11. 40 CFR 98.434 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Contained in Pre-Charged Equipment or Closed-Cell Foams § 98.434 Monitoring and QA/QC requirements. (a) For... equipment or closed-cell foam in the correct quantities (metric tons) and units (kg per piece of equipment...

  12. 40 CFR 98.434 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contained in Pre-Charged Equipment or Closed-Cell Foams § 98.434 Monitoring and QA/QC requirements. (a) For... equipment or closed-cell foam in the correct quantities (metric tons) and units (kg per piece of equipment...

  13. 40 CFR 98.434 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Contained in Pre-Charged Equipment or Closed-Cell Foams § 98.434 Monitoring and QA/QC requirements. (a) For... equipment or closed-cell foam in the correct quantities and units. [74 FR 56374, Oct. 30, 2009, as amended...

  14. 40 CFR 62.15260 - What other requirements must I meet for continuous monitoring?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What other requirements must I meet for... August 30, 1999 Other Monitoring Requirements § 62.15260 What other requirements must I meet for... waste combustion unit. (b) Temperature of flue gases at the inlet of your particulate matter air...

  15. Vital signs monitoring system

    NASA Technical Reports Server (NTRS)

    Steffen, Dale A. (Inventor); Sturm, Ronald E. (Inventor); Rinard, George A. (Inventor)

    1981-01-01

    A system is disclosed for monitoring vital physiological signs. Each of the system components utilizes a single hybrid circuit with each component having high accuracy without the necessity of repeated calibration. The system also has low power requirements, provides a digital display, and is of sufficiently small size to be incorporated into a hand-carried case for portable use. Components of the system may also provide independent outputs making the component useful, of itself, for monitoring one or more vital signs. The overall system preferably includes an ECG amplifier and cardiotachometer signal conditioner unit, an impedance pneumograph and respiration rate signal conditioner unit, a heart/breath rate processor unit, a temperature monitoring unit, a selector switch, a clock unit, and an LCD driver unit and associated LCDs, with the system being capable of being expanded as needed or desired, such as, for example, by addition of a systolic/diastolic blood pressure unit.

  16. 40 CFR 75.84 - Recordkeeping and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) CONTINUOUS EMISSION MONITORING Hg Mass Emission Provisions § 75.84 Recordkeeping and reporting... Federal Hg mass emission reduction program”; (2) The information required in § 75.58(b)(3), for units with... or sorbent trap monitoring systems, for each hour when the unit is operating, record the Hg mass...

  17. 40 CFR 98.164 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING Hydrogen Production § 98.164 Monitoring and QA/QC requirements. The GHG emissions data for hydrogen production process units must be quality-assured as specified in... Instrumental Determination of Carbon, Hydrogen, and Nitrogen in Petroleum Products and Lubricants (incorporated...

  18. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  19. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  20. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  1. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  2. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  3. Monitoring U.S. forest dynamics with Landsat [Chapter 12

    Treesearch

    Jeffrey G. Masek; Sean P. Healey

    2012-01-01

    Forest dynamics in the United States differ substantially from those in the developing world and thus present unique monitoring requirements. While deforestation and conversion to semipermanent agriculture dominate tropical forest dynamics, the area of forest land in the United States has remained fairly constant for the last 50-60 years (Birdsey and Lewis 2003)....

  4. 40 CFR 63.1366 - Monitoring and inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Monitoring and inspection requirements. 63.1366 Section 63.1366 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... daily or more frequent demonstration that the unit is working as designed and may include the daily...

  5. 40 CFR 62.14595 - What are the operator training and qualification requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... charging, and shutdown procedures. (iv) Combustion controls and monitoring. (v) Operation of air pollution... the incinerator and air pollution control devices. (vii) Actions to correct malfunctions or conditions... requirements. (xiii) Methods to continuously monitor CISWI unit and air pollution control device operating...

  6. 40 CFR 62.14595 - What are the operator training and qualification requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... charging, and shutdown procedures. (iv) Combustion controls and monitoring. (v) Operation of air pollution... the incinerator and air pollution control devices. (vii) Actions to correct malfunctions or conditions... requirements. (xiii) Methods to continuously monitor CISWI unit and air pollution control device operating...

  7. Design description of a microprocessor based Engine Monitoring and Control unit (EMAC) for small turboshaft

    NASA Technical Reports Server (NTRS)

    Baez, A. N.

    1985-01-01

    Research programs have demonstrated that digital electronic controls are more suitable for advanced aircraft/rotorcraft turbine engine systems than hydromechanical controls. Commercially available microprocessors are believed to have the speed and computational capability required for implementing advanced digital control algorithms. Thus, it is desirable to demonstrate that off-the-shelf microprocessors are indeed capable of performing real time control of advanced gas turbine engines. The engine monitoring and control (EMAC) unit was designed and fabricated specifically to meet the requirements of an advanced gas turbine engine control system. The EMAC unit is fully operational in the Army/NASA small turboshaft engine digital research program.

  8. INTEGRATED STATE-FEDERAL PARTNERSHIP FOR AQUATIC RESOURCE MONITORING

    EPA Science Inventory

    Fifteen federal agencies, 50 states, cities, counties, and 800-1000 volunteer organizations conduct aquatic resource monitoring in the United States. Most aquatic monitoring is project-specific focusing on individual locations or watersheds. The Clean Water Act requires states ...

  9. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management units in one recordkeeping system if the system identifies each record by each hazardous waste management unit. (b) Owners and operators must record the following information in the facility operating... monitoring, operating, and inspection information for each closed-vent system and control device required to...

  10. 78 FR 58154 - Importation of Litchi Fruit From Australia

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... treated with irradiation and subject to inspection. If irradiation is applied outside the United States... required irradiation treatment. If irradiation is to be applied upon arrival in the United States, the... systems approach that includes requirements for monitoring and oversight, irradiation treatment of the...

  11. A Wireless Physiological Signal Monitoring System with Integrated Bluetooth and WiFi Technologies.

    PubMed

    Yu, Sung-Nien; Cheng, Jen-Chieh

    2005-01-01

    This paper proposes a wireless patient monitoring system which integrates Bluetooth and WiFi wireless technologies. A wireless portable multi-parameter device was designated to acquire physiological signals and transmit them to a local server via Bluetooth wireless technology. Four kinds of monitor units were designed to communicate via the WiFi wireless technology, including a local monitor unit, a control center, mobile devices (personal digital assistant; PDA), and a web page. The use of various monitor units is intending to meet different medical requirements for different medical personnel. This system was demonstrated to promote the mobility and flexibility for both the patients and the medical personnel, which further improves the quality of health care.

  12. 40 CFR 98.164 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING Hydrogen Production § 98.164 Monitoring and QA/QC requirements. The GHG emissions data for hydrogen production process units must be quality-assured as specified in..., Hydrogen, and Nitrogen in Petroleum Products and Lubricants (incorporated by reference, see § 98.7). (xi...

  13. 78 FR 10136 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    .... NE multispecies sectors are required to design and implement independent, third-party at-sea... NE Multispecies Fishery Management Plan (Amendment 16) require third-party monitoring service... in order to be eligible to provide dockside and/or at-sea monitoring services to sectors. ADDRESSES...

  14. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...

  15. 40 CFR 264.99 - Compliance monitoring program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be based on a compliance monitoring program developed to meet the requirements of this section. (i... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Compliance monitoring program. 264.99... Releases From Solid Waste Management Units § 264.99 Compliance monitoring program. An owner or operator...

  16. 40 CFR 63.2270 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... appropriate, monitor malfunctions, associated repairs, and required quality assurance or control activities... monitoring in continuous operation at all times that the process unit is operating. For purposes of calculating data averages, you must not use data recorded during monitoring malfunctions, associated repairs...

  17. 40 CFR 63.2270 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate, monitor malfunctions, associated repairs, and required quality assurance or control activities... monitoring in continuous operation at all times that the process unit is operating. For purposes of calculating data averages, you must not use data recorded during monitoring malfunctions, associated repairs...

  18. 78 FR 58286 - Proposed Information Collection; Comment Request; Western Region Vessel Monitoring System and Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... Collection; Comment Request; Western Region Vessel Monitoring System and Pre-Trip Reporting Requirements... information or new problems in the fisheries. Vessel Monitoring System (VMS) units will facilitate enforcement... monitoring system (VMS) activation reports, 15 minutes; pre-trip reports, 5 minutes. Estimated Burden Hours...

  19. 40 CFR 60.646 - Monitoring of emissions and operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... concentration in the acid gas from the sweetening unit for each 24-hour period: At least one sample per 24-hour... require a more frequent sampling schedule. (3) The average acid gas flow rate from the sweetening unit... rate of acid gas. The monitoring device reading shall be recorded at least once per hour during each 24...

  20. 40 CFR 60.646 - Monitoring of emissions and operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... concentration in the acid gas from the sweetening unit for each 24-hour period: At least one sample per 24-hour... require a more frequent sampling schedule. (3) The average acid gas flow rate from the sweetening unit... rate of acid gas. The monitoring device reading shall be recorded at least once per hour during each 24...

  1. 40 CFR 60.646 - Monitoring of emissions and operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... concentration in the acid gas from the sweetening unit for each 24-hour period: At least one sample per 24-hour... require a more frequent sampling schedule. (3) The average acid gas flow rate from the sweetening unit... rate of acid gas. The monitoring device reading shall be recorded at least once per hour during each 24...

  2. 40 CFR 60.646 - Monitoring of emissions and operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... concentration in the acid gas from the sweetening unit for each 24-hour period: At least one sample per 24-hour... require a more frequent sampling schedule. (3) The average acid gas flow rate from the sweetening unit... rate of acid gas. The monitoring device reading shall be recorded at least once per hour during each 24...

  3. 40 CFR 60.646 - Monitoring of emissions and operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... concentration in the acid gas from the sweetening unit for each 24-hour period: At least one sample per 24-hour... require a more frequent sampling schedule. (3) The average acid gas flow rate from the sweetening unit... rate of acid gas. The monitoring device reading shall be recorded at least once per hour during each 24...

  4. Development of an automated potable water bactericide monitoring unit

    NASA Technical Reports Server (NTRS)

    Walsh, J. M.; Brawner, C. C.; Sauer, R. L.

    1975-01-01

    A monitor unit has been developed that permits the direct determination of the level of elemental iodine, used for microbiological control, in a spacecraft potable water supply system. Salient features of unit include low weight, volume and maintenance requirements, complete automatic operation, no inflight calibration, no expendables (except electrical current) and high accuracy and precision. This unit is capable of providing a signal to a controller that, in turn, automatically adjusts the addition rate of iodine to the potable water system so that a predetermined level of iodine can be maintained. In addition, the monitor provides a reading whereby the crewman can verify that the proper amount of iodine (within a range) is present in the water. A development history of the monitor is presented along with its design and theory of operation. Also presented are the results generated through testing of the unit in a simulated Shuttle potable water system.

  5. 2 CFR 215.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., such quantitative data should be related to cost data for computation of unit costs. (2) Reasons why..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... clearance requirements of 5 CFR part 1320 when requesting performance data from recipients. ...

  6. Integrated wireless sensor network and real time smart controlling and monitoring system for efficient energy management in standalone photovoltaic systems

    NASA Astrophysics Data System (ADS)

    Abou-Elnour, Ali; Thabt, A.; Helmy, S.; Kashf, Y.; Hadad, Y.; Tarique, M.; Abo-Elnor, Ossama

    2014-04-01

    In the present work, wireless sensor network and smart real-time controlling and monitoring system are integrated for efficient energy management of standalone photovoltaic system. The proposed system has two main components namely the monitoring and controlling system and the wireless communication system. LabView software has been used in the implementation of the monitoring and controlling system. On the other hand, ZigBee wireless modules have been used to implement the wireless system. The main functions of monitoring and controlling unit is to efficiently control the energy consumption form the photovoltaic system based on accurate determination of the periods of times at which the loads are required to be operated. The wireless communication system send the data from the monitoring and controlling unit to the loads at which desired switching operations are performed. The wireless communication system also continuously feeds the monitoring and controlling unit with updated input data from the sensors and from the photovoltaic module send to calculate and record the generated, the consumed, and the stored energy to apply load switching saving schemes if necessary. It has to be mentioned that our proposed system is a low cost and low power system because and it is flexible to be upgraded to fulfill additional users' requirements.

  7. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  8. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  9. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  10. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  11. 40 CFR 97.76 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... heat input data. 97.76 Section 97.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Monitoring and Reporting § 97.76 Additional requirements to provide heat input data. The owner or operator of... a flow system shall also monitor and report heat input rate at the unit level using the procedures...

  12. Portable Mass Spectrometer Applications for In Situ Environmental Gas Monitoring

    NASA Technical Reports Server (NTRS)

    Griffin, Timothy P.; Diaz, J. Andres; Arkin, C. Richard; Conejo, Elian

    2005-01-01

    Primary Goal of this project is to (1) Design/build a flexible system to monitor air contamination (2) Learn requirements for operating system in low pressure and low temperature environments (3) Design/build system for integration into aircraft and automobiles Secondary Goals/Offshoots are (1) Fly aboard different aircraft (2)Hand-carry unit (3) Drive unit in automobiles.

  13. Burst-by-burst laser frequency monitor

    NASA Technical Reports Server (NTRS)

    Esproles, Carlos (Inventor)

    1994-01-01

    The invention is a system for real-time frequency monitoring and display of an RF burst where the burst frequency is analyzed and displayed on a burst-by-burst basis in order to allow for frequency control. Although the invention was made for monitoring the laser frequency of a LIDAR system, it has other applications where realtime monitoring is required. The novelty of the invention resides in the use of a counter that is reset at the beginning of each unit time of monitoring and then gated for a unit of time. The invention also has an LED bar graph for displaying the measure of frequency at the end of each unit time in either a bar length mode or a moving dot mode. In the latter mode, the operator makes necessary adjustments to maintain the dot at the center of the bar graph.

  14. 40 CFR Table 24 to Subpart Uuu of... - Continuous Monitoring Systems for Inorganic HAP Emissions From Catalytic Reforming Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Inorganic HAP Emissions From Catalytic Reforming Units As stated in § 63.1567(b)(1), you shall meet each requirement in the following table that applies to you. If you use this type of control device for your vent . . . You shall install and operate this type of continuous monitoring system . . . 1. Wet scrubber...

  15. 40 CFR 63.2270 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control activities (including, as applicable, calibration checks and required zero and span adjustments), you must conduct all monitoring in continuous operation at all times that the process unit is operating. For purposes of calculating data averages, you must not use data recorded during monitoring...

  16. 40 CFR 63.2270 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control activities (including, as applicable, calibration checks and required zero and span adjustments), you must conduct all monitoring in continuous operation at all times that the process unit is operating. For purposes of calculating data averages, you must not use data recorded during monitoring...

  17. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  18. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  19. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  20. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...

  1. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Condenser Control Device

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  2. 40 CFR 63.773 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... devices: (i) Except for control devices for small glycol dehydration units, a boiler or process heater in...) Except for control devices for small glycol dehydration units, a boiler or process heater with a design...

  3. 40 CFR 63.773 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... devices: (i) Except for control devices for small glycol dehydration units, a boiler or process heater in...) Except for control devices for small glycol dehydration units, a boiler or process heater with a design...

  4. The design, development, and implementation of a data acquisition and handling system at Basin Electric Power Cooperative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baranowski, S.T.; Culp, L.R.; Jonas, T.S.

    1995-12-31

    The Clean Air Act Amendments of 1990 require all Phase 1 and 2 utilities to install Continuous Emissions Monitoring Systems (CEMS), which can consist of instrumentation including analyzers and a Data Acquisition and Handling System (DAHS). To meet these requirements, Basin Electric Power Cooperative contracted with Black and Veatch to design and develop a DAHS which would meet all 40 CFR Part 75 requirements. Basin Electric provided the specifications for the DAHS and the graphical user interface, and B and V designed, developed, and installed a DAHS at 3 units at Laramie River Station, 2 units at Antelope Valley Station,more » and 2 units at Leland Olds Station. B and V utilized the existing equipment, adding to it a unique DAHS design. B and V designed and implemented the DAHS which operates in the OS/2 environment to interface with multiple programmable logic controllers. This unique software was written in modular form so that multiple programs run in unison, monitoring each other for errors to ensure continuous operation. The reporting structure is flexible to allow for a variety of formats, including those specifically required by the state to meet CAAA guidelines. Today, these seven units are in operation and comply with the CAAA. This paper describes the issues faced during specification, general design, compliance, and implementation of the DAHS at BEPC, including the lessons learned. The continuous emissions monitoring (CEM) system for each unit at BEPC consisted of a set of dilution probe analyzers for measuring SO{sub 2}, NO{sub x}, and CO{sub 2}.« less

  5. 40 CFR Table 4 of Subpart Aaaa to... - Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Monitoring Systems (CEMS) For the following pollutants Use the following span values for your CEMS Use the... requirements, use the following alternate methods in appendix A of this part to collect data 1. Opacity 100... unit P.S. 2 Method 6C. 4. Carbon Monoxide 125 percent of the maximum expected hourly potential carbon...

  6. 40 CFR Table 4 of Subpart Aaaa to... - Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Monitoring Systems (CEMS) For the following pollutants Use the following span values for your CEMS Use the... requirements, use the following alternate methods in appendix A of this part to collect data 1. Opacity 100... unit P.S. 2 Method 6C. 4. Carbon Monoxide 125 percent of the maximum expected hourly potential carbon...

  7. 40 CFR Table 4 of Subpart Aaaa to... - Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Monitoring Systems (CEMS) 4 Table 4 of Subpart AAAA to Part 60 Protection of Environment ENVIRONMENTAL.... 60, Subpt. AAAA, Table 4 Table 4 of Subpart AAAA to Part 60—Requirements for Continuous Emission... unit P.S. 2 Method 6C. 4. Carbon Monoxide 125 percent of the maximum expected hourly potential carbon...

  8. Continuous EEG monitoring in the intensive care unit.

    PubMed

    Scheuer, Mark L

    2002-01-01

    Continuous EEG (CEEG) monitoring allows uninterrupted assessment of cerebral cortical activity with good spatial resolution and excellent temporal resolution. Thus, this procedure provides a means of constantly assessing brain function in critically ill obtunded and comatose patients. Recent advances in digital EEG acquisition, storage, quantitative analysis, and transmission have made CEEG monitoring in the intensive care unit (ICU) technically feasible and useful. This article summarizes the indications and methodology of CEEG monitoring in the ICU, and discusses the role of some quantitative EEG analysis techniques in near real-time remote observation of CEEG recordings. Clinical examples of CEEG use, including monitoring of status epilepticus, assessment of ongoing therapy for treatment of seizures in critically ill patients, and monitoring for cerebral ischemia, are presented. Areas requiring further development of CEEG monitoring techniques and indications are discussed.

  9. Reactor vessel annealing system

    DOEpatents

    Miller, Phillip E.; Katz, Leonoard R.; Nath, Raymond J.; Blaushild, Ronald M.; Tatch, Michael D.; Kordalski, Frank J.; Wykstra, Donald T.; Kavalkovich, William M.

    1991-01-01

    A system for annealing a vessel (14) in situ by heating the vessel (14) to a defined temperature, composed of: an electrically operated heater assembly (10) insertable into the vessel (14) for heating the vessel (14) to the defined temperature; temperature monitoring components positioned relative to the heater assembly (10) for monitoring the temperature of the vessel (14); a controllable electric power supply unit (32-60) for supplying electric power required by the heater assembly (10); a control unit (80-86) for controlling the power supplied by the power supply unit (32-60); a first vehicle (2) containing the power supply unit (32-60); a second vehicle (4) containing the control unit (80-86); power conductors (18,22) connectable between the power supply unit (32-60) and the heater unit (10) for delivering the power supplied by the power supply unit (32-60) to the heater assembly (10); signal conductors (20,24) connectable between the temperature monitoring components and the control unit (80-86) for delivering temperature indicating signals from the temperature monitoring components to the control unit (80-86); and control conductors (8) connectable between the control unit (80-86) and the power supply unit (32-60) for delivering to the power supply unit (32-60) control signals for controlling the level of power supplied by the power supply unit (32-60) to the heater assembly (10).

  10. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Alvarado, Juan

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility CAU 110, Area 3 WMD U-3ax/bl Crater CAU 111, Area 5 WMD Retired Mixed Waste Pits CAU 112, Area 23 Hazardous Waste Trenches The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110;more » and quarterly at CAU 111. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 1.0 inches in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAU 110, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted in addition to the visual inspections. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. This report will address all monitoring items notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 4 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.« less

  11. Compliance Assurance Monitoring Technical Guidance Document Appendix A:Volatile Organic Compound (VOC) Controls

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  12. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Fabric Filter Control Devices

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  13. Monitoring And Controlling Hydroponic Flow

    NASA Technical Reports Server (NTRS)

    Dreschel, Thomas W.

    1992-01-01

    Pressure-monitoring and -controlling apparatus maintains slight suction required on nutrient solution in apparatus described in "Tubular Membrane Plant-Growth Unit" (KSC-11375), while overcoming gravity effects on operation of system on Earth. Suction helps to hold solution in tubular membrane.

  14. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Wet Electrostatic Precipitator Control Device

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  15. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Electrostatic Precipitator Control Device

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  16. 40 CFR Part 75 Emissions Monitoring Policy Manual

    EPA Pesticide Factsheets

    Provides guidance on the requirements of 40 CFR Part 75 through a series of questions and answers that can be used by units to monitor mass sulfur dioxide emissions, mass carbon dioxide emissions, nitrogen oxide rate and heat input.

  17. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Electrified Filter Bed Control Device

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  18. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Carbon Adsorber Control Device

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  19. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Particulate Matter (PM) Controls

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  20. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Control of Other Specific Compounds

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  1. U.S. EPA'S STRATEGY FOR GROUND WATER QUALITY MONITORING AT HAZARDOUS WASTE LAND DISPOSAL FACILITIES LOCATED IN KARST TERRANES

    EPA Science Inventory

    Ground water monitoring of hazardous waste land disposal units by a network of wells is ineffective when located in karstic terranes. The U.S. Environmental Protection Agency (EPA) is currently proposing to modify its current ground water quality monitoring requirement of one upg...

  2. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardousmore » waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.« less

  3. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, Alissa J.

    2015-01-01

    This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.« less

  4. 40 CFR 63.866 - Recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...; (3) Records of parameter monitoring data required under § 63.864, including any period when the... existing semichemical combustion units at their Big Island, VA facility. [66 FR 3193, Jan. 12, 2001, as...

  5. 40 CFR 63.866 - Recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; (3) Records of parameter monitoring data required under § 63.864, including any period when the... existing semichemical combustion units at their Big Island, VA facility. [66 FR 3193, Jan. 12, 2001, as...

  6. 40 CFR 63.866 - Recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; (3) Records of parameter monitoring data required under § 63.864, including any period when the... existing semichemical combustion units at their Big Island, VA facility. [66 FR 3193, Jan. 12, 2001, as...

  7. 40 CFR 63.866 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; (3) Records of parameter monitoring data required under § 63.864, including any period when the... existing semichemical combustion units at their Big Island, VA facility. [66 FR 3193, Jan. 12, 2001, as...

  8. 40 CFR 63.866 - Recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...; (3) Records of parameter monitoring data required under § 63.864, including any period when the... existing semichemical combustion units at their Big Island, VA facility. [66 FR 3193, Jan. 12, 2001, as...

  9. 40 CFR 96.74 - Recordkeeping and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... unit subject to an Acid Rain Emission limitation who signed and certified any submission that is made.... (b) Monitoring plans. (1) The owner or operator of a unit subject to an Acid Rain emissions... operator of a unit that is not subject to an Acid Rain emissions limitation shall comply with requirements...

  10. 40 CFR 96.74 - Recordkeeping and reporting.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... unit subject to an Acid Rain Emission limitation who signed and certified any submission that is made.... (b) Monitoring plans. (1) The owner or operator of a unit subject to an Acid Rain emissions... operator of a unit that is not subject to an Acid Rain emissions limitation shall comply with requirements...

  11. 40 CFR 96.74 - Recordkeeping and reporting.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... unit subject to an Acid Rain Emission limitation who signed and certified any submission that is made.... (b) Monitoring plans. (1) The owner or operator of a unit subject to an Acid Rain emissions... operator of a unit that is not subject to an Acid Rain emissions limitation shall comply with requirements...

  12. 40 CFR 96.74 - Recordkeeping and reporting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... unit subject to an Acid Rain Emission limitation who signed and certified any submission that is made.... (b) Monitoring plans. (1) The owner or operator of a unit subject to an Acid Rain emissions... operator of a unit that is not subject to an Acid Rain emissions limitation shall comply with requirements...

  13. 40 CFR 96.74 - Recordkeeping and reporting.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... unit subject to an Acid Rain Emission limitation who signed and certified any submission that is made.... (b) Monitoring plans. (1) The owner or operator of a unit subject to an Acid Rain emissions... operator of a unit that is not subject to an Acid Rain emissions limitation shall comply with requirements...

  14. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Scrubbers for Particulate Matter Control Devices

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  15. Compliance Assurance Monitoring Technical Guidance Document Appendix A: Scrubbers for Gaseous Pollutants Control Devices

    EPA Pesticide Factsheets

    Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.

  16. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... performance data from recipients. ...

  17. 40 CFR 75.15 - Special provisions for measuring Hg mass emissions using the excepted sorbent trap monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the excepted sorbent trap monitoring methodology. For an affected coal-fired unit under a State or...; (c) A certified flow monitoring system is required; (d) Correction for stack gas moisture content is... proportional to the stack gas volumetric flow rate. (f) At the beginning and end of each sample collection...

  18. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the...'s reports. Each sales or rental report shall be reviewed by the monitoring office as it is received. When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or...

  19. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... requesting performance data from recipients. ...

  20. Harmonizing national forest inventories

    Treesearch

    Ronald E. McRoberts; Erkki O. Tomppo; Klemens Schadauer; Göran Ståhl

    2012-01-01

    International agreements increasingly require that countries report estimates of national forest resources. The United Nations Framework Convention on Climate Change requires that countries submit annual reports of greenhouse gas emissions and removals by sources and sinks. The Convention on Biological Diversity requires that countries identify and monitor components...

  1. Recommendation on Transition from Primary/Secondary Radar to Secondary- Only Radar Capability

    DTIC Science & Technology

    1994-10-01

    Radar Beacon Performance Monitor RCIU Remote Control Interface Unit RCL Remote Communications Link R E&D Research, Engineering and Development RML Radar...rate. 3.1.2.5 Maintenance The current LRRs have limited remote maintenance monitoring (RMM) capabilities via the Remote Control Interface Unit ( RCIU ...1, -2 and FPS-20 radars required an upgrade of some of the radar subsystems, namely the RCIU to respond as an RMS and the CD to interface with radar

  2. PLANT INCORPORATED PROTECTANT CROP MONITORING USING REMOTE SENSING

    EPA Science Inventory

    The extent of past and anticipated plantings of transgenic corn in the United States requires a new approach to monitor this important crop for the development of pest resistance. Remote sensing by aerial and/or satellite images may provide a method of identifying transgenic pest...

  3. A survey of atmospheric monitoring systems in U.S. underground coal mines

    PubMed Central

    Rowland, J.H.; Harteis, S.P.; Yuan, L.

    2018-01-01

    In 1995 and 2003, the U.S. Mine Safety and Health Administration (MSHA) conducted surveys to determine the number of atmospheric monitoring systems (AMS) that were being used in underground coal mines in the United States. The survey reports gave data for the different AMS manufacturers, the different types of equipment monitored, and the different types of gas sensors and their locations. Since the last survey in 2003, MSHA has changed the regulation requirements for early fire detection along belt haulage entries. As of Dec. 31, 2009, point-type heat sensors are prohibited for use for an early fire detection system. Instead, carbon monoxide (CO) sensors are now required. This report presents results from a new survey and examines how the regulation changes have had an impact on the use of CO sensors in underground coal mines in the United States. The locations and parameters monitored by AMS and CO systems are also discussed. PMID:29674789

  4. 40 CFR 270.4 - Effect of a permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regarding leak detection systems for new and replacement surface impoundment, waste pile, and landfill units, and lateral expansions of surface impoundment, waste pile, and landfill units. The leak detection system requirements include double liners, CQA programs, monitoring, action leakage rates, and response...

  5. A NEW APPROACH TO PIP CROP MONITORING USING REMOTE SENSING

    EPA Science Inventory

    Current plantings of 25+ million acres of transgenic corn in the United States require a new approach to monitor this important crop for the development of pest resistance. Remote sensing by aerial or satellite images may provide a method of identifying transgenic pesticidal cro...

  6. 40 CFR 264.90 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applying to a regulated unit with alternative requirements for groundwater monitoring and corrective action for releases to groundwater set out in the permit (or in an enforceable document) (as defined in 40... contributed to the release; and (2) It is not necessary to apply the groundwater monitoring and corrective...

  7. 40 CFR 264.90 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applying to a regulated unit with alternative requirements for groundwater monitoring and corrective action for releases to groundwater set out in the permit (or in an enforceable document) (as defined in 40... contributed to the release; and (2) It is not necessary to apply the groundwater monitoring and corrective...

  8. 40 CFR 264.90 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applying to a regulated unit with alternative requirements for groundwater monitoring and corrective action for releases to groundwater set out in the permit (or in an enforceable document) (as defined in 40... contributed to the release; and (2) It is not necessary to apply the groundwater monitoring and corrective...

  9. 40 CFR Appendix E to Part 63 - Monitoring Procedure for Nonthoroughly Mixed Open Biological Treatment Systems at Kraft Pulp...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... II. Definitions Biological treatment unit = wastewater treatment unit designed and operated to... last zone in the series and ending with the first zone. B. Data Collection Requirements This method is based upon modeling the nonthoroughly mixed open biological treatment unit as a series of well-mixed...

  10. Successful choice behavior is associated with distinct and coherent network states in anterior cingulate cortex

    PubMed Central

    Lapish, Christopher C.; Durstewitz, Daniel; Chandler, L. Judson; Seamans, Jeremy K.

    2008-01-01

    Successful decision making requires an ability to monitor contexts, actions, and outcomes. The anterior cingulate cortex (ACC) is thought to be critical for these functions, monitoring and guiding decisions especially in challenging situations involving conflict and errors. A number of different single-unit correlates have been observed in the ACC that reflect the diverse cognitive components involved. Yet how ACC neurons function as an integrated network is poorly understood. Here we show, using advanced population analysis of multiple single-unit recordings from the rat ACC during performance of an ecologically valid decision-making task, that ensembles of neurons move through different coherent and dissociable states as the cognitive requirements of the task change. This organization into distinct network patterns with respect to both firing-rate changes and correlations among units broke down during trials with numerous behavioral errors, especially at choice points of the task. These results point to an underlying functional organization into cell assemblies in the ACC that may monitor choices, outcomes, and task contexts, thus tracking the animal's progression through “task space.” PMID:18708525

  11. 50 CFR 665.19 - Vessel monitoring system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) shall not be assessed any fee or other charges to obtain and use a VMS unit, including the communication charges related directed to requirements under this section. Communication charges related to any... equipment, including a computer, to any VMS unit when deemed appropriate by the SAC. ...

  12. Specifications Physiological Monitoring System

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The operation of a physiological monitoring system (PMS) is described. Specifications were established for performance, design, interface, and test requirements. The PMS is a compact, microprocessor-based system, which can be worn in a pack on the body or may be mounted on a Spacelab rack or other appropriate structure. It consists of two modules, the Data Control Unit (DCU) and the Remote Control/Display Unit (RCDU). Its purpose is to collect and distribute data from physiological experiments in the Spacelab and in the Orbiter.

  13. [Development of a portable ambulatory ECG monitor based on embedded microprocessor unit].

    PubMed

    Wang, Da-xiong; Wang, Guo-jun

    2005-06-01

    To develop a new kind of portable ambulatory ECG monitor. The hardware and software were designed based on RCA-CDP1802. New methods of ECG data compression and feature extraction of QRS complexes were applied to software design. A model for automatic arrhythmia analysis was established for real-time ambulatory ECG Data analysis. Compact, low power consumption and low cost were emphasized in the hardware design. This compact and light-weight monitor with low power consumption and high intelligence was capable of real-time monitoring arrhythmia for more than 48 h. More than ten types of arrhythmia could be detected, only the compressed abnormal ECG data was recorded and could be transmitted to the host if required. The monitor meets the design requirements and can be used for ambulatory ECG monitoring.

  14. 40 CFR 75.22 - Reference test methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... recertification of continuous emission monitoring Systems; NOX emission tests of low mass emission units under... continuous moisture monitoring systems are conducted. For the purpose of determining the stack gas molecular... traverse requirement of the method; (iv) Section 8.6 of the method allowing for the use of “Dynamic Spiking...

  15. Monitoring environmental quality at the landscape scale

    Treesearch

    Robert V. O' Neill; Carolyn T. Hunsaker; K. Bruce Jones; Kurt H. Riitters; James D. Wickham; Paul M. Schwartz; Iris A. Goodman; Barbara L. Jackson; William S. Baillargeon

    1997-01-01

    Over the past century, technological advances have greatly improved the standard of living in the United States. But these same advances have caused sweeping environmental changes, often unforeseen and potentially irreparable. Ethical stewardship of the environment requires that society monitor and assess environmental changes at the national scale with a view toward...

  16. Passive Sampling in Regulatory Chemical Monitoring of Nonpolar Organic Compounds in the Aquatic Environment

    EPA Science Inventory

    We reviewed compliance monitoring requirements in the European Union (EU), the United States(USA), and the Oslo-Paris Convention for the protection of the marine environment of the North-East Atlantic (OSPAR), and evaluated if these are met by passive sampling methods for nonpola...

  17. Stochastic modeling to identify requirements for centralized monitoring of distributed wastewater treatment.

    PubMed

    Hug, T; Maurer, M

    2012-01-01

    Distributed (decentralized) wastewater treatment can, in many situations, be a valuable alternative to a centralized sewer network and wastewater treatment plant. However, it is critical for its acceptance whether the same overall treatment performance can be achieved without on-site staff, and whether its performance can be measured. In this paper we argue and illustrate that the system performance depends not only on the design performance and reliability of the individual treatment units, but also significantly on the monitoring scheme, i.e. on the reliability of the process information. For this purpose, we present a simple model of a fleet of identical treatment units. Thereby, their performance depends on four stochastic variables: the reliability of the treatment unit, the respond time for the repair of failed units, the reliability of on-line sensors, and the frequency of routine inspections. The simulated scenarios show a significant difference between the true performance and the observations by the sensors and inspections. The results also illustrate the trade-off between investing in reactor and sensor technology and in human interventions in order to achieve a certain target performance. Modeling can quantify such effects and thereby support the identification of requirements for the centralized monitoring of distributed treatment units. The model approach is generic and can be extended and applied to various distributed wastewater treatment technologies and contexts.

  18. Development of a wearable measurement and control unit for personal customizing machine-supported exercise.

    PubMed

    Wang, Zhihui; Tamura, Naoki; Kiryu, Tohru

    2005-01-01

    Wearable technology has been used in various health-related fields to develop advanced monitoring solutions. However, the monitoring function alone cannot meet all the requirements of personal customizing machine-supported exercise that have biosignal-based controls. In this paper, we propose a new wearable unit design equipped with measurement and control functions to support the personal customization process. The wearable unit can measure the heart rate and electromyogram signals during exercise and output workload control commands to the exercise machines. We then applied a prototype of the wearable unit to an Internet-based cycle ergometer system. The wearable unit was examined using twelve young people to check its feasibility. The results verified that the unit could successfully adapt to the control of the workload and was effective for continuously supporting gradual changes in physical activities.

  19. Monitoring fetal pH by telemetry

    NASA Technical Reports Server (NTRS)

    Blum, A.; Donahoe, T.; Jhabvala, M. D.; Ryan, W.

    1980-01-01

    Telemetry unit has been developed for possible use in measuring scalp-tissue pH and heart rate of unborn infant. Unit radius data to receiver as much as 50 ft. away. Application exists during hours just prior to childbirth to give warning of problems that might require cesarean delivery.

  20. 40 CFR 61.357 - Reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 61.357 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... wastewater treatment system unit is monitored in accordance with § 61.354(a)(1) of this subpart, then each... unit is equal to or greater than 10 ppmw. (ii) If a treatment process or wastewater treatment system...

  1. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... readily quantified, such quantitative data should be related to cost data for computation of unit costs... including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e) Recipients... comply with clearance requirements of 5 CFR part 1320 when requesting performance data from recipients. ...

  2. Solid Waste Management Units And Areas Of Concern Annual Long-Term Monitoring & Maintenance Report For Calendar Year 2016.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dotson, Patrick Wells; Little, Bonnie Colleen

    Long-term controls were maintained at 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) in accordance with the requirements of the “Long-Term Monitoring and Maintenance Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit, which took effect February 26, 2015. Maintenance and controls at these SWMUs and AOCs are described and documented in this report. Conditions requiring maintenance or repair activities were not identified for any of the inspected SWMUs or AOCs. Based upon the inspections performed and site conditions observed, the administrativemore » and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment. This report does not present monitoring and maintenance activities for SWMU 76, the Mixed Waste Landfill; those activities adhere to the approved MWL LTMM Plan, Section 4.8.1 requiring a separate annual report which will be submitted to the NMED by June 30, 2017.« less

  3. Audit of transfusion procedures in 660 hospitals. A College of American Pathologists Q-Probes study of patient identification and vital sign monitoring frequencies in 16494 transfusions.

    PubMed

    Novis, David A; Miller, Karen A; Howanitz, Peter J; Renner, Stephen W; Walsh, Molly K

    2003-05-01

    Hemolytic transfusion reactions are often the result of failure to follow established identification and monitoring procedures. To measure the frequencies with which health care workers completed specific transfusion procedures required for laboratory and blood bank accreditation. In 2 separate studies, participants in the College of American Pathologists Q-Probes laboratory quality improvement program audited nonemergent red blood cell transfusions prospectively and completed questionnaires profiling their institutions' transfusion policies. A total of 660 institutions, predominantly in the United States, at which transfusion medicine services are provided. The percentages of transfusions for which participants completed 4 specific components of patient and blood unit identifications, and for which participants monitored vital signs at 3 specific intervals during transfusions. In the first study, all components of patient identification procedures were performed in 62.3%, and all required patient vital sign monitoring was performed in 81.6% of 12 448 transfusions audited. The median frequencies with which institutions participating in the first study performed all patient identification and monitoring procedures were 69.0% and 90.2%, respectively. In the second study, all components of patient identification were performed in 25.4% and all patient vital sign monitoring was performed in 88.3% of 4046 transfusions audited. The median frequencies with which institutions participating in the second study performed all patient identification and monitoring procedures were 10.0% and 95.0%, respectively. Individual practices and/or institutional policies associated with greater frequencies of patient identification and/or vital sign monitoring included transporting units of blood directly to patient bedsides, having no more than 1 individual handle blood units in route, checking unit labels against physicians' orders, having patients wear identification tags (wristbands), reading identification information aloud when 2 or more transfusionists participated, using written checklists to guide the administration of blood, instructing health care personnel in transfusion practices, and routinely auditing the administration of transfusions. In many hospitals, the functions of identification and vital sign monitoring of patients receiving blood transfusions do not meet laboratory and blood bank accreditation standards. Differences in hospital transfusion policies influence how well health care workers comply with standard practices. We would expect that efforts designed to perfect transfusion policies might also improve performance in those hospitals in which practice compliance is substandard.

  4. Discrimination of Pest Infestation at the Landscape Level

    EPA Science Inventory

    Surveillance of the United States agricultural landscape requires coverage over a large area. Over 86,000,000 acres of land were planted with maize in the United States in 2009. Over 78% of this was located in ten states in the Midwest. To monitor this large landscape for the ...

  5. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... performance data from recipients. (Approved by the Office of Management and Budget, Approval Number 1225-0017) ...

  6. 78 FR 14226 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... groundfish sector to request exemptions from Federal fishing regulations through its annual operations plan... rule implementing the annual sector operations plans. However, sectors can request exemptions at any...-funded at-sea monitoring program will be required to develop a monitoring plan as part of its operation...

  7. Annual Performance Report. 2002-2003. Wyoming Department of Education.

    ERIC Educational Resources Information Center

    Wyoming State Department of Education, 2004

    2004-01-01

    Wyoming's Department of Education (WDE?s) Special Programs Unit conducts compliance monitoring for all IDEA procedural requirements on a five-year cycle. The current process began for Wyoming?s school districts in 1999-2000 and will be completed in 2004-05. The special education monitoring process is a comprehensive program review. The process…

  8. A Candidate Functional Architecture Design for the Detection and Monitoring Process of a Counterdrug Joint Task Force

    DTIC Science & Technology

    1993-06-01

    completes the functional decomposition of the detection and monitoring requirements of the Counterdrug JTF. David Marca in his text SADT, Structural...September 1992. 12. Marca , D. McGowan, C., SADT, Structured Analysis and Design Technique, Mc Graw-Hill , 1988. 13. United States Department of

  9. Design and implementation of the National Water-Quality Assessment Program: a United States example: understanding the limitations of using compliance-monitoring data to assess the water quality of a large river basin

    USGS Publications Warehouse

    Wangsness, David J.

    1997-01-01

    In the 1980s it was determined that existing ambient and compliance-monitoring data could not satisfactorily evaluate the results of hundreds of billions of dollars spent for water-pollution abatement in the United States. At the request of the US Congress, a new programme, the National Water-Quality Assessment, was designed and implemented by government agency, the US Geological Survey (USGS). The Assessment has reported status and trends in surface- and ground-water quality at national, regional, and local scales since 1991. The legislative basis for US monitoring and data-sharing policies are identified as well as the successive phases of the design and implementation of the USGS Assessment. Application to the Danube Basin is suggested. Much of the water-quality monitoring conducted in the United States is designed to comply with Federal and State laws mandated primarily by the Clean Water Act of 1987 and the Safe Drinking Water Act of 1986. Monitoring programs generally focus on rivers upstream and downstream of point-source discharges and at water-supply intakes. Few data are available for aquifer systems, and chemical analyses are often limited to those constituents required by law. In most cases, the majority of the available chemical and streamflow data have provided the information necessary to meet the objectives of the compliance-monitoring programs, but do not necessarily provide the information requires for basin-wide assessments of the water quality at the local, regional, or national scale.

  10. 24 CFR 891.833 - Monitoring and review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Partnerships and Mixed-Finance Development for Supportive Housing for the Elderly or Persons with Disabilities... and operational phases in accordance with the requirements that HUD prescribes. In order for units... requirements. It is the responsibility of the mixed-finance owner and Nonprofit Organization to ensure...

  11. The practical implementation of fatigue requirements to military aircraft and helicopters in the United Kingdom

    NASA Technical Reports Server (NTRS)

    Maxwell, R. D. J.

    1972-01-01

    The methods adopted in the United Kingdom to ensure the structural integrity of military aeroplanes and helicopters from the fatigue point of view are described. The procedure adopted from the writing of the specification to the monitoring of fatigue life in service are presented along with the requirements to be met and the way in which they are satisfied. Some of the outstanding problems that remain to be solved are indicated.

  12. [Prospects in getting accordance between chemical analytic control means and medical technical requirements to safety system concerning chemical weapons destruction].

    PubMed

    Rembovskiĭ, V R; Mogilenkova, L A; Savel'eva, E I

    2005-01-01

    The major unit monitoring chemical weapons destruction objects is a system of chemical analyticcontrol over the technologic process procedures and possibility of environment and workplace pollution withtoxicchemicals and their destruction products. At the same time, physical and chemical control means meet sanitary and hygienic requirements incompletely. To provide efficient control, internationally recognized approaches should be adapted to features of Russian system monitoring pollution of chemical weapons destruction objects with toxic chemicals.

  13. Gamma motes for detection of radioactive materials in shipping containers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harold McHugh; William Quam; Stephan Weeks

    Shipping containers can be effectively monitored for radiological materials using gamma (and neutron) motes in distributed mesh networks. The mote platform is ideal for collecting data for integration into operational management systems required for efficiently and transparently monitoring international trade. Significant reductions in size and power requirements have been achieved for room-temperature cadmium zinc telluride (CZT) gamma detectors. Miniaturization of radio modules and microcontroller units are paving the way for low-power, deeply-embedded, wireless sensor distributed mesh networks.

  14. Some computer graphical user interfaces in radiation therapy.

    PubMed

    Chow, James C L

    2016-03-28

    In this review, five graphical user interfaces (GUIs) used in radiation therapy practices and researches are introduced. They are: (1) the treatment time calculator, superficial X-ray treatment time calculator (SUPCALC) used in the superficial X-ray radiation therapy; (2) the monitor unit calculator, electron monitor unit calculator (EMUC) used in the electron radiation therapy; (3) the multileaf collimator machine file creator, sliding window intensity modulated radiotherapy (SWIMRT) used in generating fluence map for research and quality assurance in intensity modulated radiation therapy; (4) the treatment planning system, DOSCTP used in the calculation of 3D dose distribution using Monte Carlo simulation; and (5) the monitor unit calculator, photon beam monitor unit calculator (PMUC) used in photon beam radiation therapy. One common issue of these GUIs is that all user-friendly interfaces are linked to complex formulas and algorithms based on various theories, which do not have to be understood and noted by the user. In that case, user only needs to input the required information with help from graphical elements in order to produce desired results. SUPCALC is a superficial radiation treatment time calculator using the GUI technique to provide a convenient way for radiation therapist to calculate the treatment time, and keep a record for the skin cancer patient. EMUC is an electron monitor unit calculator for electron radiation therapy. Instead of doing hand calculation according to pre-determined dosimetric tables, clinical user needs only to input the required drawing of electron field in computer graphical file format, prescription dose, and beam parameters to EMUC to calculate the required monitor unit for the electron beam treatment. EMUC is based on a semi-experimental theory of sector-integration algorithm. SWIMRT is a multileaf collimator machine file creator to generate a fluence map produced by a medical linear accelerator. This machine file controls the multileaf collimator to deliver intensity modulated beams for a specific fluence map used in quality assurance or research. DOSCTP is a treatment planning system using the computed tomography images. Radiation beams (photon or electron) with different energies and field sizes produced by a linear accelerator can be placed in different positions to irradiate the tumour in the patient. DOSCTP is linked to a Monte Carlo simulation engine using the EGSnrc-based code, so that 3D dose distribution can be determined accurately for radiation therapy. Moreover, DOSCTP can be used for treatment planning of patient or small animal. PMUC is a GUI for calculation of the monitor unit based on the prescription dose of patient in photon beam radiation therapy. The calculation is based on dose corrections in changes of photon beam energy, treatment depth, field size, jaw position, beam axis, treatment distance and beam modifiers. All GUIs mentioned in this review were written either by the Microsoft Visual Basic.net or a MATLAB GUI development tool called GUIDE. In addition, all GUIs were verified and tested using measurements to ensure their accuracies were up to clinical acceptable levels for implementations.

  15. Improving IMRT delivery efficiency using intensity limits during inverse planning.

    PubMed

    Coselmon, Martha M; Moran, Jean M; Radawski, Jeffrey D; Fraass, Benedick A

    2005-05-01

    Inverse planned intensity modulated radiotherapy (IMRT) fields can be highly modulated due to the large number of degrees of freedom involved in the inverse planning process. Additional modulation typically results in a more optimal plan, although the clinical rewards may be small or offset by additional delivery complexity and/or increased dose from transmission and leakage. Increasing modulation decreases delivery efficiency, and may lead to plans that are more sensitive to geometrical uncertainties. The purpose of this work is to assess the use of maximum intensity limits in inverse IMRT planning as a simple way to increase delivery efficiency without significantly affecting plan quality. Nine clinical cases (three each for brain, prostate, and head/neck) were used to evaluate advantages and disadvantages of limiting maximum intensity to increase delivery efficiency. IMRT plans were generated using in-house protocol-based constraints and objectives for the brain and head/neck, and RTOG 9406 dose volume objectives in the prostate. Each case was optimized at a series of maximum intensity ratios (the product of the maximum intensity and the number of beams divided by the prescribed dose to the target volume), and evaluated in terms of clinical metrics, dose-volume histograms, monitor units (MU) required per fraction (SMLC and DMLC delivery), and intensity map variation (a measure of the beam modulation). In each site tested, it was possible to reduce total monitor units by constraining the maximum allowed intensity without compromising the clinical acceptability of the plan. Monitor unit reductions up to 38% were observed for SMLC delivery, while reductions up to 29% were achieved for DMLC delivery. In general, complicated geometries saw a smaller reduction in monitor units for both delivery types, although DMLC delivery required significantly more monitor units in all cases. Constraining the maximum intensity in an inverse IMRT plan is a simple way to improve delivery efficiency without compromising plan objectives.

  16. Glucose control and use of continuous glucose monitoring in the intensive care unit: a critical review.

    PubMed

    De Block, Christophe; Manuel-y-Keenoy, Begoña; Rogiers, Peter; Jorens, Philippe; Van Gaal, Luc

    2008-08-01

    Stress hyperglycemia recently became a major therapeutic target in the Intensive Care Unit (ICU) since it occurs in most critically ill patients and is associated with adverse outcome, including increased mortality. Intensive insulin therapy to achieve normoglycemia may reduce mortality, morbidity and the length of ICU and in-hospital stay. However, obtaining normoglycemia requires extensive efforts from the medical staff, including frequent glucose monitoring and adjustment of insulin dose. Current insulin titration is based upon discrete glucose measurements, which may miss fast changes in glycemia and which does not give a full picture of overall glycemic control. Recent evidence suggests that continuous monitoring of glucose levels may help to signal glycemic excursions and eventually to optimize insulin titration in the ICU. In this review we will summarise monitoring and treatment strategies to achieve normoglycemia in the ICU, with special emphasis on the possible advantages of continuous glucose monitoring.

  17. 78 FR 13345 - Agency Forms Undergoing Paperwork Reduction Act Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... Project Requirements for the Importation of Nonhuman Primates into the United States (formerly... May 1990, CDC has monitored the arrival and/or uncrating of certain shipments of non-human primates... regulations pertaining to the importation of nonhuman primates. The first rule rule, Requirements for...

  18. 76 FR 36071 - Atlantic Highly Migratory Species; Vessel Monitoring Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... 2003. The MTU VMS unit is currently required to report positions on an hourly basis when HMS fishing... position only, and, in some instances, do not even indicate whether the unit is on and functioning properly... to report while vessels are at sea. NMFS enforcement agents have also reported difficulty...

  19. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (d) Recipients are required to submit the... when requesting performance data from recipients. [Order No. 1980-95, 60 FR 38242, July 26, 1995; Order...

  20. Early labour services: changes, triggers, monitoring and evaluation.

    PubMed

    Spiby, Helen; Green, Josephine M; Richardson-Foster, Helen; Hucknall, Clare

    2013-04-01

    to identify the changes to early labour services, their triggers and monitoring. a mixed methods approach in two stages, firstly a postal questionnaire survey of Heads of Midwifery (HoM) services in NHS Trusts in England (cover sheet to each HoM and questionnaire for each unit in their jurisdiction) and, secondly, semi-structured telephone interviews with a purposive sample of senior midwives. The interviews sought further information about reasons for change; the impact of changes and explored the unit's particular innovations. PARTICIPANTS AND RESPONSE RATE: 145 (89%) NHS Trusts provided data (cover sheet and/or questionnaire); responses were received from all areas and types of unit. Seventeen HoMs or designated senior midwives were interviewed. 83 of 170 units (49%) had made changes to early labour service provision during the past 5 years, including home assessment; the introduction of triage units and telephone assessment tools. Changes were more likely in high volume units and in consultant units with midwifery-led care areas. Further changes were planned by 93/178 (25%) units. Triggers for changes to early labour services comprised local or unit-based factors, including Category X (non-labour) admissions, response to service users and research evidence. The impact of Category X admissions on workload contributed to the triggers for change. Fifty-six (31%) could provide a confirmed figure or estimate for category X admissions. Experiences of introducing change included issues related to engagement of the workforce and the contribution of clinical leadership. Thirty-eight (48%) units did not routinely monitor use of early labour services. Overall monitoring of services was not significantly more likely in units that had made changes. Audit activity was reported more frequently in units that had made changes to their early labour services. early labour services had undergone significant changes following a range of triggers but the extent of change was not reflected in monitoring and evaluation activity. Changes to service provision should be accompanied by monitoring and evaluation. Changes to services require utilisation of appropriate change management strategies. Copyright © 2012 Elsevier Ltd. All rights reserved.

  1. Monitoring and management of tritium from the nuclear power plant effluent

    NASA Astrophysics Data System (ADS)

    Zhang, Qiaoe; Liu, Ting; Yang, Lili; Meng, De; Song, Dahu

    2018-01-01

    It is important to regulate tritium nuclides from the nuclear power plant effluent, the paper briefly analyzes the main source of tritium, and the regulatory requirements associated with tritium in our country and the United States. The monitoring methods of tritium from the nuclear power plant effluent are described, and the purpose to give some advice to our national nuclear power plant about the effluent of tritium monitoring and management.

  2. Verification of monitor unit calculations for non-IMRT clinical radiotherapy: report of AAPM Task Group 114.

    PubMed

    Stern, Robin L; Heaton, Robert; Fraser, Martin W; Goddu, S Murty; Kirby, Thomas H; Lam, Kwok Leung; Molineu, Andrea; Zhu, Timothy C

    2011-01-01

    The requirement of an independent verification of the monitor units (MU) or time calculated to deliver the prescribed dose to a patient has been a mainstay of radiation oncology quality assurance. The need for and value of such a verification was obvious when calculations were performed by hand using look-up tables, and the verification was achieved by a second person independently repeating the calculation. However, in a modern clinic using CT/MR/PET simulation, computerized 3D treatment planning, heterogeneity corrections, and complex calculation algorithms such as convolution/superposition and Monte Carlo, the purpose of and methodology for the MU verification have come into question. In addition, since the verification is often performed using a simpler geometrical model and calculation algorithm than the primary calculation, exact or almost exact agreement between the two can no longer be expected. Guidelines are needed to help the physicist set clinically reasonable action levels for agreement. This report addresses the following charges of the task group: (1) To re-evaluate the purpose and methods of the "independent second check" for monitor unit calculations for non-IMRT radiation treatment in light of the complexities of modern-day treatment planning. (2) To present recommendations on how to perform verification of monitor unit calculations in a modern clinic. (3) To provide recommendations on establishing action levels for agreement between primary calculations and verification, and to provide guidance in addressing discrepancies outside the action levels. These recommendations are to be used as guidelines only and shall not be interpreted as requirements.

  3. 18 CFR 35.28 - Non-discriminatory open access transmission tariff.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... identifies the Market Monitoring Unit's goals, including the protection of consumers and market participants... organization's behavior may require investigation, including, but not limited to, suspected Market Violations...

  4. A method for estimation of bias and variability of continuous gas monitor data: application to carbon monoxide monitor accuracy.

    PubMed

    Shulman, Stanley A; Smith, Jerome P

    2002-01-01

    A method is presented for the evaluation of the bias, variability, and accuracy of gas monitors. This method is based on using the parameters for the fitted response curves of the monitors. Thereby, variability between calibrations, between dates within each calibration period, and between different units can be evaluated at several different standard concentrations. By combining variability information with bias information, accuracy can be assessed. An example using carbon monoxide monitor data is provided. Although the most general statistical software required for these tasks is not available on a spreadsheet, when the same number of dates in a calibration period are evaluated for each monitor unit, the calculations can be done on a spreadsheet. An example of such calculations, together with the formulas needed for their implementation, is provided. In addition, the methods can be extended by use of appropriate statistical models and software to evaluate monitor trends within calibration periods, as well as consider the effects of other variables, such as humidity and temperature, on monitor variability and bias.

  5. 40 CFR 60.5225 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements for compliance with my operating limits? 60.5225 Section 60.5225 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units Model Rule...

  6. 40 CFR 60.5190 - How do I establish my operating limits?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Times for Existing Sewage Sludge Incineration Units Model Rule-Initial Compliance Requirements § 60.5190..., and cadmium. (4) For an activated carbon injection system designed to control emissions of mercury, you are not required to establish an operating limit and monitor sorbent injection rate and carrier...

  7. 40 CFR 60.5190 - How do I establish my operating limits?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Times for Existing Sewage Sludge Incineration Units Model Rule-Initial Compliance Requirements § 60.5190..., and cadmium. (4) For an activated carbon injection system designed to control emissions of mercury, you are not required to establish an operating limit and monitor sorbent injection rate and carrier...

  8. 40 CFR 60.5190 - How do I establish my operating limits?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Times for Existing Sewage Sludge Incineration Units Model Rule-Initial Compliance Requirements § 60.5190..., and cadmium. (4) For an activated carbon injection system designed to control emissions of mercury, you are not required to establish an operating limit and monitor sorbent injection rate and carrier...

  9. 40 CFR 60.5190 - How do I establish my operating limits?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Times for Existing Sewage Sludge Incineration Units Model Rule-Initial Compliance Requirements § 60.5190..., and cadmium. (4) For an activated carbon injection system designed to control emissions of mercury, you are not required to establish an operating limit and monitor sorbent injection rate and carrier...

  10. 14 CFR 171.51 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...

  11. 14 CFR 171.51 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...

  12. 14 CFR 171.51 - Maintenance and operations requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...

  13. Measurement of greenhouse gases in UAE by using Unmanned Aerial Vehicle (UAV)

    NASA Astrophysics Data System (ADS)

    Abou-Elnour, Ali; Odeh, Mohamed; Abdelrhman, Mohammed; Balkis, Ahmed; Amira, Abdelraouf

    2017-04-01

    In the present work, a reliable and low cost system has been designed and implemented to measure greenhouse gases (GHG) in United Arab Emirates (UAE) by using unmanned aerial vehicle (UAV). A set of accurate gas, temperature, pressure, humidity sensors are integrated together with a wireless communication system on a microcontroller based platform to continuously measure the required data. The system instantaneously sends the measured data to a center monitoring unit via the wireless communication system. In addition, the proposed system has the features that all measurements are recorded directly in a storage device to allow effective monitoring in regions with weak or no wireless coverage. The obtained data will be used in all further sophisticated calculations for environmental research and monitoring purposes.

  14. 40 CFR 96.76 - Additional requirements to provide heat input data for allocations purposes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... heat input data for allocations purposes. 96.76 Section 96.76 Protection of Environment ENVIRONMENTAL... to provide heat input data for allocations purposes. (a) The owner or operator of a unit that elects... also monitor and report heat input at the unit level using the procedures set forth in part 75 of this...

  15. 40 CFR 96.76 - Additional requirements to provide heat input data for allocations purposes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... heat input data for allocations purposes. 96.76 Section 96.76 Protection of Environment ENVIRONMENTAL... to provide heat input data for allocations purposes. (a) The owner or operator of a unit that elects... also monitor and report heat input at the unit level using the procedures set forth in part 75 of this...

  16. 40 CFR 96.76 - Additional requirements to provide heat input data for allocations purposes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... heat input data for allocations purposes. 96.76 Section 96.76 Protection of Environment ENVIRONMENTAL... to provide heat input data for allocations purposes. (a) The owner or operator of a unit that elects... also monitor and report heat input at the unit level using the procedures set forth in part 75 of this...

  17. 40 CFR 96.76 - Additional requirements to provide heat input data for allocations purposes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... heat input data for allocations purposes. 96.76 Section 96.76 Protection of Environment ENVIRONMENTAL... to provide heat input data for allocations purposes. (a) The owner or operator of a unit that elects... also monitor and report heat input at the unit level using the procedures set forth in part 75 of this...

  18. 40 CFR 63.8240 - What are my monitoring requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) National Emission Standards for Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali...-product hydrogen stream, each end box ventilation system vent, and each mercury thermal recovery unit vent...

  19. Summary of Part 75 Administrative Processes: Table 1

    EPA Pesticide Factsheets

    Learn how to submit your initial certification, recertification, monitoring plans, routine quality assurance tests, diagnostic tests and DAHS verifications, low mass emissions units and other notification requirements. Table 1, initial certification.

  20. 40 CFR 62.14740 - What must I include in the deviation report?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That..., and causes for monitoring downtime incidents (other than downtime associated with zero, span, and...

  1. 40 CFR 62.14740 - What must I include in the deviation report?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That..., and causes for monitoring downtime incidents (other than downtime associated with zero, span, and...

  2. 40 CFR 62.14740 - What must I include in the deviation report?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That..., and causes for monitoring downtime incidents (other than downtime associated with zero, span, and...

  3. 40 CFR 62.14740 - What must I include in the deviation report?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That..., and causes for monitoring downtime incidents (other than downtime associated with zero, span, and...

  4. Intelligent MONitoring System for antiviral pharmacotherapy in patients with chronic hepatitis C (SiMON-VC).

    PubMed

    Margusino-Framiñán, Luis; Cid-Silva, Purificación; Mena-de-Cea, Álvaro; Sanclaudio-Luhía, Ana Isabel; Castro-Castro, José Antonio; Vázquez-González, Guillermo; Martín-Herranz, Isabel

    2017-01-01

    Two out of six strategic axes of pharmaceutical care in our hospital are quality and safety of care, and the incorporation of information technologies. Based on this, an information system was developed in the outpatient setting for pharmaceutical care of patients with chronic hepatitis C, SiMON-VC, which would improve the quality and safety of their pharmacotherapy. The objective of this paper is to describe requirements, structure and features of Si- MON-VC. Requirements demanded were that the information system would enter automatically all critical data from electronic clinical records at each of the visits to the Outpatient Pharmacy Unit, allowing the generation of events and alerts, documenting the pharmaceutical care provided, and allowing the use of data for research purposes. In order to meet these requirements, 5 sections were structured for each patient in SiMON-VC: Main Record, Events, Notes, Monitoring Graphs and Tables, and Follow-up. Each section presents a number of tabs with those coded data needed to monitor patients in the outpatient unit. The system automatically generates alerts for assisted prescription validation, efficacy and safety of using antivirals for the treatment of this disease. It features a completely versatile Indicator Control Panel, where temporary monitoring standards and alerts can be set. It allows the generation of reports, and their export to the electronic clinical record. It also allows data to be exported to the usual operating systems, through Big Data and Business Intelligence. Summing up, we can state that SiMON-VC improves the quality of pharmaceutical care provided in the outpatient pharmacy unit to patients with chronic hepatitis C, increasing the safety of antiviral therapy. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  5. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or monitoring Method TANKS: 63.1256(b)(3)(i) Inspect fixed roof and all openings for leaks Initially... openings for leaks Initially Semiannually Visual. 63.1256(c)(2) Inspect surface impoundment for control....1256(d)(1)(ii) Inspect cover and all openings for leaks Initially Semiannually Visual. 63.1256(d)(3)(i...

  6. 40 CFR Table 7 to Subpart Bbbb of... - Model Rule-Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Emission Monitoring Systems (CEMS) 7 Table 7 to Subpart BBBB of Part 60 Protection of Environment... or Before August 30, 1999 Pt. 60, Subpt. BBBB, Table 7 Table 7 to Subpart BBBB of Part 60—Model Rule... sulfur dioxide emissions of the municipal waste combustion unit 4. Carbon Monoxide 125 percent of the...

  7. 40 CFR Table 4 of Subpart Aaaa of... - Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Monitoring Systems (CEMS) 4 Table 4 of Subpart AAAA of Part 60 Protection of Environment ENVIRONMENTAL... Definitions What definitions must I know? Pt. 60, Subpt. AAAA, Table 4 Table 4 of Subpart AAAA of Part 60... dioxide emissions of the municipal waste combustion unit P.S. 2 Method 6C. 4. Carbon Monoxide 125 percent...

  8. 40 CFR Table 4 of Subpart Aaaa of... - Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Monitoring Systems (CEMS) 4 Table 4 of Subpart AAAA of Part 60 Protection of Environment ENVIRONMENTAL... Definitions What definitions must I know? Pt. 60, Subpt. AAAA, Table 4 Table 4 of Subpart AAAA of Part 60... dioxide emissions of the municipal waste combustion unit P.S. 2 Method 6C. 4. Carbon Monoxide 125 percent...

  9. 40 CFR Table 7 to Subpart Bbbb of... - Model Rule-Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Emission Monitoring Systems (CEMS) 7 Table 7 to Subpart BBBB of Part 60 Protection of Environment... or Before August 30, 1999 Pt. 60, Subpt. BBBB, Table 7 Table 7 to Subpart BBBB of Part 60—Model Rule... sulfur dioxide emissions of the municipal waste combustion unit 4. Carbon Monoxide 125 percent of the...

  10. 40 CFR Table 7 to Subpart Bbbb of... - Model Rule-Requirements for Continuous Emission Monitoring Systems (CEMS)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Emission Monitoring Systems (CEMS) 7 Table 7 to Subpart BBBB of Part 60 Protection of Environment... or Before August 30, 1999 Pt. 60, Subpt. BBBB, Table 7 Table 7 to Subpart BBBB of Part 60—Model Rule... sulfur dioxide emissions of the municipal waste combustion unit 4. Carbon Monoxide 125 percent of the...

  11. Challenges in Hospital-Associated Infection Management: A Unit Perspective.

    PubMed

    Stacy, Kathleen M

    2015-01-01

    Maintaining a successful unit-based continuous quality improvement program for managing hospital-associated infections is a huge challenge and an overwhelming task. It requires strong organizational support and unit leadership, human and fiscal resources, time, and a dedicated and motivated nursing staff. A great deal of effort goes into implementing, monitoring, reporting, and evaluating quality improvement initiatives and can lead to significant frustration on the part of the leadership team and nursing staff when quality improvement efforts fail to produce the desired results. Each initiative presents its own unique set of challenges; however, common issues influence all initiatives. These common issues include organization and unit culture, current clinical practice guidelines being used to drive the initiatives, performance discrepancies on the part of nursing staff, availability of resources including equipment and supplies, monitoring of the data, and conflicting quality improvement priorities.

  12. Meter for very slow flows

    NASA Technical Reports Server (NTRS)

    Baxter, W. J., Jr.; Frant, M. S.; West, S. J.

    1978-01-01

    Solid-state sensing unit developed for use with NASA's Water-Quality Monitoring System can detect small velocity changes in slow moving fluid. Nonprotruding sensor is applicable to numerous other uses requiring sensitive measurement of slow flows.

  13. 40 CFR 63.1283 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the following types of control devices: (i) Except for control devices for small glycol dehydration... used as the primary fuel; (ii) Except for control devices for small glycol dehydration units, a boiler...

  14. 40 CFR 63.1283 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the following types of control devices: (i) Except for control devices for small glycol dehydration... used as the primary fuel; (ii) Except for control devices for small glycol dehydration units, a boiler...

  15. 40 CFR 98.184 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... calendar year. The monthly mass may be determined using plant instruments used for accounting purposes, including either direct measurement of the quantity of the material placed in the unit or by calculations...

  16. 40 CFR 98.114 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... calendar year. The monthly mass may be determined using plant instruments used for accounting purposes, including either direct measurement of the quantity of the material placed in the unit or by calculations...

  17. 40 CFR 503.22 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be closed and, at a minimum, shall include: (1) A discussion of how the leachate collection system... sludge unit has a liner and leachate collection system. (2) A description of the system used to monitor...

  18. 40 CFR 503.22 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... be closed and, at a minimum, shall include: (1) A discussion of how the leachate collection system... sludge unit has a liner and leachate collection system. (2) A description of the system used to monitor...

  19. 40 CFR 503.22 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be closed and, at a minimum, shall include: (1) A discussion of how the leachate collection system... sludge unit has a liner and leachate collection system. (2) A description of the system used to monitor...

  20. 40 CFR 503.22 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... be closed and, at a minimum, shall include: (1) A discussion of how the leachate collection system... sludge unit has a liner and leachate collection system. (2) A description of the system used to monitor...

  1. 40 CFR 503.22 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... be closed and, at a minimum, shall include: (1) A discussion of how the leachate collection system... sludge unit has a liner and leachate collection system. (2) A description of the system used to monitor...

  2. Some computer graphical user interfaces in radiation therapy

    PubMed Central

    Chow, James C L

    2016-01-01

    In this review, five graphical user interfaces (GUIs) used in radiation therapy practices and researches are introduced. They are: (1) the treatment time calculator, superficial X-ray treatment time calculator (SUPCALC) used in the superficial X-ray radiation therapy; (2) the monitor unit calculator, electron monitor unit calculator (EMUC) used in the electron radiation therapy; (3) the multileaf collimator machine file creator, sliding window intensity modulated radiotherapy (SWIMRT) used in generating fluence map for research and quality assurance in intensity modulated radiation therapy; (4) the treatment planning system, DOSCTP used in the calculation of 3D dose distribution using Monte Carlo simulation; and (5) the monitor unit calculator, photon beam monitor unit calculator (PMUC) used in photon beam radiation therapy. One common issue of these GUIs is that all user-friendly interfaces are linked to complex formulas and algorithms based on various theories, which do not have to be understood and noted by the user. In that case, user only needs to input the required information with help from graphical elements in order to produce desired results. SUPCALC is a superficial radiation treatment time calculator using the GUI technique to provide a convenient way for radiation therapist to calculate the treatment time, and keep a record for the skin cancer patient. EMUC is an electron monitor unit calculator for electron radiation therapy. Instead of doing hand calculation according to pre-determined dosimetric tables, clinical user needs only to input the required drawing of electron field in computer graphical file format, prescription dose, and beam parameters to EMUC to calculate the required monitor unit for the electron beam treatment. EMUC is based on a semi-experimental theory of sector-integration algorithm. SWIMRT is a multileaf collimator machine file creator to generate a fluence map produced by a medical linear accelerator. This machine file controls the multileaf collimator to deliver intensity modulated beams for a specific fluence map used in quality assurance or research. DOSCTP is a treatment planning system using the computed tomography images. Radiation beams (photon or electron) with different energies and field sizes produced by a linear accelerator can be placed in different positions to irradiate the tumour in the patient. DOSCTP is linked to a Monte Carlo simulation engine using the EGSnrc-based code, so that 3D dose distribution can be determined accurately for radiation therapy. Moreover, DOSCTP can be used for treatment planning of patient or small animal. PMUC is a GUI for calculation of the monitor unit based on the prescription dose of patient in photon beam radiation therapy. The calculation is based on dose corrections in changes of photon beam energy, treatment depth, field size, jaw position, beam axis, treatment distance and beam modifiers. All GUIs mentioned in this review were written either by the Microsoft Visual Basic.net or a MATLAB GUI development tool called GUIDE. In addition, all GUIs were verified and tested using measurements to ensure their accuracies were up to clinical acceptable levels for implementations. PMID:27027225

  3. 33 CFR 157.12f - Workshop functional test requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements. (a) Each oil content meter and each control section of a monitoring system must be subjected to a... protocol must be received with each unit delivered. (b) A functional test conducted on an oil content meter...

  4. 33 CFR 157.12f - Workshop functional test requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements. (a) Each oil content meter and each control section of a monitoring system must be subjected to a... protocol must be received with each unit delivered. (b) A functional test conducted on an oil content meter...

  5. 33 CFR 157.12f - Workshop functional test requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements. (a) Each oil content meter and each control section of a monitoring system must be subjected to a... protocol must be received with each unit delivered. (b) A functional test conducted on an oil content meter...

  6. 26 CFR 1.42-5 - Monitoring compliance with low-income housing credit requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... be required to retain the original local health, safety, or building code violation reports or... account local health, safety, and building codes (or other habitability standards), and the State or local government unit responsible for making local health, safety, or building code inspections did not issue a...

  7. 78 FR 53397 - Atlantic Highly Migratory Species; Vessel Monitoring Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... operators by eliminating the requirement to hail-out two hours in advance of leaving port. Additionally... long as the VMS unit was turned on at least two hours prior to leaving port and remained on until the vessel returned to port. These requirements were specific to vessels both holding an HMS permit and...

  8. 26 CFR 1.42-5 - Monitoring compliance with low-income housing credit requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... be required to retain the original local health, safety, or building code violation reports or... account local health, safety, and building codes (or other habitability standards), and the State or local government unit responsible for making local health, safety, or building code inspections did not issue a...

  9. Automated Cryocooler Monitor and Control System Software

    NASA Technical Reports Server (NTRS)

    Britchcliffe, Michael J.; Conroy, Bruce L.; Anderson, Paul E.; Wilson, Ahmad

    2011-01-01

    This software is used in an automated cryogenic control system developed to monitor and control the operation of small-scale cryocoolers. The system was designed to automate the cryogenically cooled low-noise amplifier system described in "Automated Cryocooler Monitor and Control System" (NPO-47246), NASA Tech Briefs, Vol. 35, No. 5 (May 2011), page 7a. The software contains algorithms necessary to convert non-linear output voltages from the cryogenic diode-type thermometers and vacuum pressure and helium pressure sensors, to temperature and pressure units. The control function algorithms use the monitor data to control the cooler power, vacuum solenoid, vacuum pump, and electrical warm-up heaters. The control algorithms are based on a rule-based system that activates the required device based on the operating mode. The external interface is Web-based. It acts as a Web server, providing pages for monitor, control, and configuration. No client software from the external user is required.

  10. Phasor Measurement Unit and Its Application in Modern Power Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ma, Jian; Makarov, Yuri V.; Dong, Zhao Yang

    2010-06-01

    The introduction of phasor measuring units (PMUs) in power systems significantly improves the possibilities for monitoring and analyzing power system dynamics. Synchronized measurements make it possible to directly measure phase angles between corresponding phasors in different locations within the power system. Improved monitoring and remedial action capabilities allow network operators to utilize the existing power system in a more efficient way. Improved information allows fast and reliable emergency actions, which reduces the need for relatively high transmission margins required by potential power system disturbances. In this chapter, the applications of PMU in modern power systems are presented. Specifically, the topicsmore » touched in this chapter include state estimation, voltage and transient stability, oscillation monitoring, event and fault detection, situation awareness, and model validation. A case study using Characteristic Ellipsoid method based on PMU to monitor power system dynamic is presented.« less

  11. Information Technology in Critical Care: Review of Monitoring and Data Acquisition Systems for Patient Care and Research

    PubMed Central

    De Georgia, Michael A.; Kaffashi, Farhad; Jacono, Frank J.; Loparo, Kenneth A.

    2015-01-01

    There is a broad consensus that 21st century health care will require intensive use of information technology to acquire and analyze data and then manage and disseminate information extracted from the data. No area is more data intensive than the intensive care unit. While there have been major improvements in intensive care monitoring, the medical industry, for the most part, has not incorporated many of the advances in computer science, biomedical engineering, signal processing, and mathematics that many other industries have embraced. Acquiring, synchronizing, integrating, and analyzing patient data remain frustratingly difficult because of incompatibilities among monitoring equipment, proprietary limitations from industry, and the absence of standard data formatting. In this paper, we will review the history of computers in the intensive care unit along with commonly used monitoring and data acquisition systems, both those commercially available and those being developed for research purposes. PMID:25734185

  12. Information technology in critical care: review of monitoring and data acquisition systems for patient care and research.

    PubMed

    De Georgia, Michael A; Kaffashi, Farhad; Jacono, Frank J; Loparo, Kenneth A

    2015-01-01

    There is a broad consensus that 21st century health care will require intensive use of information technology to acquire and analyze data and then manage and disseminate information extracted from the data. No area is more data intensive than the intensive care unit. While there have been major improvements in intensive care monitoring, the medical industry, for the most part, has not incorporated many of the advances in computer science, biomedical engineering, signal processing, and mathematics that many other industries have embraced. Acquiring, synchronizing, integrating, and analyzing patient data remain frustratingly difficult because of incompatibilities among monitoring equipment, proprietary limitations from industry, and the absence of standard data formatting. In this paper, we will review the history of computers in the intensive care unit along with commonly used monitoring and data acquisition systems, both those commercially available and those being developed for research purposes.

  13. Cardiac Care Assistance using Self Configured Sensor Network—a Remote Patient Monitoring System

    NASA Astrophysics Data System (ADS)

    Sarma Dhulipala, V. R.; Kanagachidambaresan, G. R.

    2014-04-01

    Pervasive health care systems are used to monitor patients remotely without disturbing the normal day-to-day activities in real-time. Wearable physiological sensors required to monitor various significant ecological parameters of the patients are connected to Body Central Unit (BCU). Body Sensor Network (BSN) updates data in real-time and are designed to transmit alerts against abnormalities which enables quick response by medical units in case of an emergency. BSN helps monitoring patient without any need for attention to the subject. BSN helps in reducing the stress and strain caused by hospital environment. In this paper, mathematical models for heartbeat signal, electro cardio graph (ECG) signal and pulse rate are introduced. These signals are compared and their RMS difference-fast Fourier transforms (PRD-FFT) are processed. In the context of cardiac arrest, alert messages of these parameters and first aid for post-surgical operations has been suggested.

  14. Valve Health Monitoring System Utilizing Smart Instrumentation

    NASA Technical Reports Server (NTRS)

    Jensen, Scott L.; Drouant, George J.

    2006-01-01

    The valve monitoring system is a stand alone unit with network capabilities for integration into a higher level health management system. The system is designed for aiding in failure predictions of high-geared ball valves and linearly actuated valves. It performs data tracking and archiving for identifying degraded performance. The data collection types are cryogenic cycles, total cycles, inlet temperature, body temperature torsional strain, linear bonnet strain, preload position, total travel and total directional changes. Events are recorded and time stamped in accordance with the IRIG B True Time. The monitoring system is designed for use in a Class 1 Division II explosive environment. The basic configuration consists of several instrumentation sensor units and a base station. The sensor units are self contained microprocessor controlled and remotely mountable in three by three by two inches. Each unit is potted in a fire retardant substance without any cavities and limited to low operating power for maintaining safe operation in a hydrogen environment. The units are temperature monitored to safeguard against operation outside temperature limitations. Each contains 902-928 MHz band digital transmitters which meet Federal Communication Commission's requirements and are limited to a 35 foot transmission radius for preserving data security. The base-station controller correlates data from the sensor units and generates data event logs on a compact flash memory module for database uploading. The entries are also broadcast over an Ethernet network. Nitrogen purged National Electrical Manufactures Association (NEMA) Class 4 enclosures are used to house the base-station

  15. Valve health monitoring system utilizing smart instrumentation

    NASA Astrophysics Data System (ADS)

    Jensen, Scott L.; Drouant, George J.

    2006-05-01

    The valve monitoring system is a stand alone unit with network capabilities for integration into a higher level health management system. The system is designed for aiding in failure predictions of high-geared ball valves and linearly actuated valves. It performs data tracking and archiving for identifying degraded performance. The data collection types are: cryogenic cycles, total cycles, inlet temperature, outlet temperature, body temperature, torsional strain, linear bonnet strain, preload position, total travel, and total directional changes. Events are recorded and time stamped in accordance with the IRIG B True Time. The monitoring system is designed for use in a Class 1 Division II explosive environment. The basic configuration consists of several instrumentation sensor units and a base station. The sensor units are self contained microprocessor controlled and remotely mountable in three by three by two inches. Each unit is potted in a fire retardant substance without any cavities and limited to low operating power for maintaining safe operation in a hydrogen environment. The units are temperature monitored to safeguard against operation outside temperature limitations. Each contains 902-928 MHz band digital transmitters which meet Federal Communication Commissions requirements and are limited to a 35 foot transmission radius for preserving data security. The base-station controller correlates related data from the sensor units and generates data event logs on a compact flash memory module for database uploading. The entries are also broadcast over an Ethernet network. Nitrogen purged National Electrical Manufactures Association (NEMA) Class 4 Enclosures are used to house the base-station.

  16. 40 CFR Table 3 to Subpart Rrr of... - Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Group 1 furnace without add-on controls Fluxing in sidewell furnace hearth Maintain flux addition... emission units with an add-on air pollution control device Emission capture and collection system Annual... specifications, or at least once every 6 months. Group 1 furnace, group 2 furnace, in-line fluxer, and scrap...

  17. 40 CFR Table 3 to Subpart Rrr of... - Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; certify every 6 months. Group 1 furnace without add-on controls Fluxing in sidewell furnace hearth... sources and emission units with an add-on air pollution control device Emission capture and collection... to manufacturers specifications, or at least once every 6 months. Group 1 furnace, group 2 furnace...

  18. Watershed management in the United States in the 21st Century

    Treesearch

    David B. Thorud; George W. Brown; Brian J. Boyle; Clare M. Ryan

    2000-01-01

    Views of watershed management in the 21st Century are presented in terms of concept, status, progress and future of watershed planning. The watershed as a unit will increasingly be the basis of planning because the concept is widely understood, many state and federal laws require such a focus, and watersheds are a logical entity for monitoring purposes. Impediments to...

  19. Site Environmental Report for 2002, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pauer, Ron

    2003-07-01

    Each year, Ernest Orlando Lawrence Berkeley National Laboratory prepares an integrated report on its environmental programs to satisfy the requirements of United States Department of Energy Order 231.1. The ''Site Environmental Report for 2002'' summarizes Berkeley Lab's compliance with environmental standards and requirements, characterizes environmental management efforts through surveillance and monitoring activities, and highlights significant programs and efforts for calendar year 2002. Throughout this report, Ernest Orlando Lawrence Berkeley National Laboratory is referred to as ''Berkeley Lab,'' ''the Laboratory,'' ''Lawrence Berkeley National Laboratory,'' and ''LBNL.'' The report is separated into two volumes. Volume I contains a general overview of themore » Laboratory, the status of environmental programs, and summarized results from surveillance and monitoring activities. Volume II contains individual data results from the monitoring programs. This year, the ''Site Environmental Report'' was distributed on a CD in PDF format that includes Volume I, Volume II, and related documents. The report is also available on the Web at http://www.lbl.gov/ehs/esg/. The report follows the Laboratory's policy of using the International System of Units (SI), also known as the metric system of measurements. Whenever possible, results are additionally reported using the more conventional (non-SI) system of measurements because this system is referenced by some current regulatory standards and is more familiar to some readers. The tables included at the end of the Glossary are intended to help readers understand the various prefixes used with SI units of measurement and convert these units from one system to the other.« less

  20. Site Environmental Report for 2002, Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pauer, Ron

    2003-07-01

    Each year, Ernest Orlando Lawrence Berkeley National Laboratory prepares an integrated report on its environmental programs to satisfy the requirements of United States Department of Energy Order 231.1. The ''Site Environmental Report for 2002'' summarizes Berkeley Lab's compliance with environmental standards and requirements, characterizes environmental management efforts through surveillance and monitoring activities, and highlights significant programs and efforts for calendar year 2002. Throughout this report, Ernest Orlando Lawrence Berkeley National Laboratory is referred to as ''Berkeley Lab,'' ''the Laboratory,'' ''Lawrence Berkeley National Laboratory,'' and ''LBNL.'' The report is separated into two volumes. Volume I contains a general overview of themore » Laboratory, the status of environmental programs, and summarized results from surveillance and monitoring activities. Volume II contains individual data results from the monitoring programs. This year, the ''Site Environmental Report'' was distributed on a CD in PDF format that includes Volume I, Volume II, and related documents. The report is also available on the Web at http://www.lbl.gov/ehs/esg/. The report follows the Laboratory's policy of using the International System of Units (SI), also known as the metric system of measurements. Whenever possible, results are additionally reported using the more conventional (non-SI) system of measurements because this system is referenced by some current regulatory standards and is more familiar to some readers. The tables included at the end of the Glossary are intended to help readers understand the various prefixes used with SI units of measurement and convert these units from one system to the other.« less

  1. Ultra-Low Power Event-Driven Wireless Sensor Node Using Piezoelectric Accelerometer for Health Monitoring

    NASA Astrophysics Data System (ADS)

    Okada, Hironao; Kobayashi, Takeshi; Masuda, Takashi; Itoh, Toshihiro

    2009-07-01

    We describe a low power consumption wireless sensor node designed for monitoring the conditions of animals, especially of chickens. The node detects variations in 24-h behavior patterns by acquiring the number of the movement of an animal whose acceleration exceeds a threshold measured in per unit time. Wireless sensor nodes when operated intermittently are likely to miss necessary data during their sleep mode state and waste the power in the case of acquiring useless data. We design the node worked only when required acceleration is detected using a piezoelectric accelerometer and a comparator for wake-up source of micro controller unit.

  2. 40 CFR 60.2945 - Is there a minimum amount of operating parameter monitoring data I must obtain?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards of Performance for Other Solid Waste Incineration Units for Which Construction is Commenced After... activities (including, as applicable, calibration checks and required zero and span adjustments of the... municipal or institutional solid waste. (c) If you do not obtain the minimum data required in paragraphs (a...

  3. 40 CFR 60.2945 - Is there a minimum amount of operating parameter monitoring data I must obtain?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards of Performance for Other Solid Waste Incineration Units for Which Construction is Commenced After... activities (including, as applicable, calibration checks and required zero and span adjustments of the... municipal or institutional solid waste. (c) If you do not obtain the minimum data required in paragraphs (a...

  4. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  5. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  6. 40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or..., and validation check. (9) Except for redundant sensors, any device that is used to conduct an initial validation or accuracy audit of a CPMS must meet the accuracy requirements specified in paragraphs (f)(9)(i...

  7. 40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or..., and validation check. (9) Except for redundant sensors, any device that is used to conduct an initial validation or accuracy audit of a CPMS must meet the accuracy requirements specified in paragraphs (f)(9)(i...

  8. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  9. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  10. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  11. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  12. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  13. 28-Bit serial word simulator/monitor

    NASA Technical Reports Server (NTRS)

    Durbin, J. W.

    1979-01-01

    Modular interface unit transfers data at high speeds along four channels. Device expedites variable-word-length communication between computers. Operation eases exchange of bit information by automatically reformatting coded input data and status information to match requirements of output.

  14. Space shuttle main engine controller

    NASA Technical Reports Server (NTRS)

    Mattox, R. M.; White, J. B.

    1981-01-01

    A technical description of the space shuttle main engine controller, which provides engine checkout prior to launch, engine control and monitoring during launch, and engine safety and monitoring in orbit, is presented. Each of the major controller subassemblies, the central processing unit, the computer interface electronics, the input electronics, the output electronics, and the power supplies are described and discussed in detail along with engine and orbiter interfaces and operational requirements. The controller represents a unique application of digital concepts, techniques, and technology in monitoring, managing, and controlling a high performance rocket engine propulsion system. The operational requirements placed on the controller, the extremely harsh operating environment to which it is exposed, and the reliability demanded, result in the most complex and rugged digital system ever designed, fabricated, and flown.

  15. Long-term continuous monitor demonstration program: Columbus and Southern Ohio Electric Company, Conesville Unit 6. Final report Dec 79-Mar 83

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peduto, E.F. Jr.; Porter, T.J.; Midgley, D.P.

    1984-03-01

    The report gives results of a continuous monitoring demonstration at the Columbus and Southern Ohio Electric Company's Conesville Generating Station. The purpose of the demonstration was to determine the feasibility of the requirements for monitoring and control of SO2 emissions as specified in 40 CFR, Part 60, Subpart Da, which promulgates new source performance standards (NSPS) for new utility steam generators. A secondary objective was to adhere to the draft quality assurance requirements scheduled for promulgation as Appendix F. The report describes program activities and results of the field portion, during which data were collected for about 12 months ofmore » a 16-month period.« less

  16. 76 FR 46835 - Notice of Submission of Proposed Information Collection to OMB; Use Restriction Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. This information is used to ensure monitor and ensure that units are maintained and used solely as rental housing in accordance with the terms of the Use Agreement through the original maturity date of the mortgage. This information is also monitored by HUD (via form HUD- 90075) to ensure compliance with the executed and recorded Use Agreement.

  17. Next Generation Microbiology Requirements

    NASA Technical Reports Server (NTRS)

    Ott, C. M.; Oubre, C. M.; Elliott, T. F.; Castro, V. A.; Pierson, D. L.

    2012-01-01

    As humans continue to explore deep into space, microorganisms will travel with them. The primary means to mitigate the risk of infectious disease are a combination of prudent spacecraft design and rigorous operational controls. The effectiveness of these methods are evaluated by microbiological monitoring of spacecraft, food, water, and the crew that is performed preflight, in-flight, and post-flight. Current NASA requirements associated with microbiological monitoring are based on culture-based methodology where microorganisms are grown on a semi-solid growth medium and enumerated. Subsequent identification of the organisms requires specialized labor and large equipment, which historically has been performed on Earth. Requirements that rely strictly on culture-based units limit the use of non-culture based monitoring technology. Specifically, the culture-based "measurement criteria" are Colony Forming Units (CFU, representing the growth of one microorganism at a single location on the agar medium) per a given volume, area, or sample size. As the CFU unit by definition is culture-based, these requirements limit alternative technologies for spaceflight applications. As spaceflight missions such as those to Mars extend further into space, culture-based technology will become difficult to implement due to the (a) limited shelf life of the culture media, (b) mass/volume necessary to carry these consumables, and (c) problems associated with the production of biohazardous material in the habitable volume of the spacecraft. In addition, an extensive amount of new knowledge has been obtained during the Space Shuttle, NASA-Mir, and International Space Station Programs, which gave direction for new or modified microbial control requirements for vehicle design and mission operations. The goal of this task is to develop and recommend a new set of requirements for vehicle design and mission operations, including microbiological monitoring, based upon "lessons learned" and new technology. During 2011, this study focused on evaluating potable water requirements by assembling a forum of internal and external experts from NASA, other federal agencies, and academia. Key findings from this forum included: (1) Preventive design and operational strategies should be stringent and the primary focus of NASA's mitigation efforts, as they are cost effective and can be attained with conventional technology. (2) Microbial monitoring hardware should be simple and must be able to measure the viability of microorganisms in a sample. Multiple monitoring technologies can be utilized as long as at the microorganisms being identified can also be confirmed as viable. (3) Evidence showing alterations in the crew immune function and microbial virulence complicates risk assessments and creates the need for very conservative requirements. (4) One key source of infectious agents will always be the crew, and appropriate preventative measures should be taken preflight. (5) Water systems should be thoroughly disinfected (sterilized if possible) preflight and retain a residual biocide throughout the mission. Future forums will cover requirements for other types of samples, specifically spaceflight food and environmental samples, such as vehicle air and vehicle and cargo surfaces. An interim report on the potable water forum has been delivered to the Human Research Program with a final report on the recommendations for all sample types being delivered in September 2013.

  18. RCRA, superfund and EPCRA hotline training module. Introduction to: Land disposal units (40 cfr parts 264/265, subparts k, l, m, n) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module provides an overview of the requirements for landfills, surface impoundments, waste piles, and land treatment units. It summarizes the differences between interim status (Part 265) and permitted (Part 264) standards for land disposal units. It defines `surface impoundment` and distinguishes surface impoundments from tanks and describes surface impoundment retrofitting and retrofitting variance procedures. It explains the connection between land disposal standards, post-closure, and groundwater monitoring.

  19. SU-E-T-110: An Investigation On Monitor Unit Threshold and Effects On IMPT Delivery in Proton Pencil Beam Planning System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Syh, J; Ding, X; Syh, J

    2015-06-15

    Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization,more » specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study.« less

  20. Awareness Enhancing and Monitoring Device plus Habit Reversal in the Treatment of Trichotillomania: An Open Feasibility Trial.

    PubMed

    Himle, Joseph A; Bybee, Deborah; O'Donnell, Lisa A; Weaver, Addie; Vlnka, Sarah; DeSena, Daniel T; Rimer, Jessica M

    2018-01-01

    Habit Reversal Therapy (HRT) is helpful for many persons suffering from trichotillomania. However successful habit reversal therapy requires awareness of hair pulling behaviors. Available methods to monitor hair pulling behaviors are less than ideal, particularly when sufferers are unaware of their pulling-related behaviors. This open feasibility trial included 20 persons with trichotillomania who were treated with nine weeks of HRT with experienced clinicians following a well-established HRT protocol. HRT was augmented with an electronic Awareness Enhancing and Monitoring Device (AEMD) designed to alert users of hand to head contact and to monitor the frequency of pulling-related behaviors. The AEMD included a neck unit and two wrist units, each equipped with vibrating alert functions. The results of the open trial revealed significant improvements in trichotillomania symptoms as measured by clinician and self-report rating scales. Most participants met study criteria for HRT completion and treatment effects were large. Participants reported that the AEMD, when operational, was effective in alerting participants to TTM-related behaviors. The monitoring function of the AEMD did not operate as designed. Subjective feedback focused on the AEMD concept was positive but AEMD reliability problems and complaints about the wearability the units were common. Recommendations for AEMD design modifications were included.

  1. A proposed ground-water quality monitoring network for Idaho

    USGS Publications Warehouse

    Whitehead, R.L.; Parliman, D.J.

    1979-01-01

    A ground water quality monitoring network is proposed for Idaho. The network comprises 565 sites, 8 of which will require construction of new wells. Frequencies of sampling at the different sites are assigned at quarterly, semiannual, annual, and 5 years. Selected characteristics of the water will be monitored by both laboratory- and field-analysis methods. The network is designed to: (1) Enable water managers to keep abreast of the general quality of the State 's ground water, and (2) serve as a warning system for undesirable changes in ground-water quality. Data were compiled for hydrogeologic conditions, ground-water quality, cultural elements, and pollution sources. A ' hydrologic unit priority index ' is used to rank 84 hydrologic units (river basins or segments of river basins) of the State for monitoring according to pollution potential. Emphasis for selection of monitoring sites is placed on the 15 highest ranked units. The potential for pollution is greatest in areas of privately owned agricultural land. Other areas of pollution potential are residential development, mining and related processes, and hazardous waste disposal. Data are given for laboratory and field analyses, number of site visits, manpower, subsistence, and mileage, from which costs for implementing the network can be estimated. Suggestions are made for data storage and retrieval and for reporting changes in water quality. (Kosco-USGS)

  2. Design and implementation of a Bluetooth-based infant monitoring/saver (BIMS) system

    NASA Astrophysics Data System (ADS)

    Sonmez, Ahmet E.; Nalcaci, Murat T.; Pazarbasi, Mehmet A.; Toker, Onur; Fidanboylu, Kemal

    2007-04-01

    In this work, we discuss the design and implementation of a Bluetooth technology based infant monitoring system, which will enable the mother to monitor her baby's health condition remotely in real-time. The system will measure the heart rate, and temperature of the infant, and stream this data to the mother's Bluetooth based mobile unit, e.g. cell phone, PDA, etc. Existing infant monitors either require so many cables, or transmit only voice and/or video information, which is not enough for monitoring the health condition of an infant. With the proposed system, the mother will be warned against any abnormalities, which may be an indication of a disease, which in turn may result a sudden infant death. High temperature is a common symptom for several diseases, and heart rate is an essential sign of life, low or high heart rates are also essentials symptoms. Because of these reasons, the proposed system continously measures these two critical values. A 12 bits digital temperature sensor is used to measure infant's body temperature, and a piezo film sensor is used measure infant's heartbeat rate. These sensors, some simple analog circuitry, and a ToothPick unit are the main components of our embedded system. ToothPick unit is basically a Microchip 18LF6720 microcontroller, plus an RF circuitry with Bluetooth stack.

  3. Pacific Northwest National Laboratory Potential Impact Categories for Radiological Air Emission Monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballinger, Marcel Y.; Gervais, Todd L.; Barnett, J. Matthew

    2012-06-05

    In 2002, the EPA amended 40 CFR 61 Subpart H and 40 CFR 61 Appendix B Method 114 to include requirements from ANSI/HPS N13.1-1999 Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities for major emission points. Additionally, the WDOH amended the Washington Administrative Code (WAC) 246-247 Radiation protection-air emissions to include ANSI/HPS N13.1-1999 requirements for major and minor emission points when new permitting actions are approved. A result of the amended regulations is the requirement to prepare a written technical basis for the radiological air emission sampling and monitoring program. A keymore » component of the technical basis is the Potential Impact Category (PIC) assigned to an emission point. This paper discusses the PIC assignments for the Pacific Northwest National Laboratory (PNNL) Integrated Laboratory emission units; this revision includes five PIC categories.« less

  4. 40 CFR 98.164 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Fossil fuel consumption, when, pursuant to § 98.33(e), the owner or operator of a unit that uses CEMS to quantify CO2 emissions and that combusts both fossil and biogenic fuels separately reports the biogenic...

  5. 78 FR 33020 - Fisheries of the Northeastern United States; Atlantic Herring Fishery; Amendment 5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ..., promotes the long-term health and stability of the herring resource, monitors the fishery, facilitates... catch apply uniformly to all vessels under the Closed Area I requirements, inequality among the fleet is...

  6. Design of ecoregional monitoring in conservation areas of high-latitude ecosystems under contemporary climate change

    USGS Publications Warehouse

    Beever, Erik A.; Woodward, Andrea

    2011-01-01

    Land ownership in Alaska includes a mosaic of federally managed units. Within its agency’s context, each unit has its own management strategy, authority, and resources of conservation concern, many of which are migratory animals. Though some units are geographically isolated, many are nevertheless linked by paths of abiotic and biotic flows, such as rivers, air masses, flyways, and terrestrial and aquatic migration routes. Furthermore, individual land units exist within the context of a larger landscape pattern of shifting conditions, requiring managers to understand at larger spatial scales the status and trends in the synchrony and spatial concurrence of species and associated suitable habitats. Results of these changes will determine the ability of Alaska lands to continue to: provide habitat for local and migratory species; absorb species whose ranges are shifting northward; and experience mitigation or exacerbation of climate change through positive and negative atmospheric feedbacks. We discuss the geographic and statutory contexts that influence development of ecological monitoring; argue for the inclusion of significant amounts of broad-scale monitoring; discuss the importance of defining clear programmatic and monitoring objectives; and draw from lessons learned from existing long-term, broad-scale monitoring programs to apply to the specific contexts relevant to high-latitude protected areas such as those in Alaska. Such areas are distinguished by their: marked seasonality; relatively large magnitudes of contemporary change in climatic parameters; and relative inaccessibility due to broad spatial extent, very low (or zero) road density, and steep and glaciated areas. For ecological monitoring to effectively support management decisions in high-latitude areas such as Alaska, a monitoring program ideally would be structured to address the actual spatial and temporal scales of relevant processes, rather than the artificial boundaries of individual land-management units. Heuristic models provide a means by which to integrate understanding of ecosystem structure, composition, and function, in the midst of numerous ecosystem drivers.

  7. Imputing forest carbon stock estimates from inventory plots to a nationally continuous coverage

    Treesearch

    Barry Tyler Wilson; Christopher W. Woodall; Douglas M. Griffith

    2013-01-01

    The U.S. has been providing national-scale estimates of forest carbon (C) stocks and stock change to meet United Nations Framework Convention on Climate Change (UNFCCC) reporting requirements for years. Although these currently are provided as national estimates by pool and year to meet greenhouse gas monitoring requirements, there is growing need to disaggregate these...

  8. Theater Blood Application Was Not Effectively Developed and Implemented

    DTIC Science & Technology

    2015-07-17

    blood product by unit; and • monitor non- Food and Drug Administration Blood Product Testing. The CONOPS document also identified over 400 specific...time of a transfusion. However, this requirement was not identified in the CONOPS document. Further, PEO DHCS officials provided a traceability ...the CONOPS document, requirements management database, and the traceability matrix increased the risk that the Theater Blood Application

  9. Requirements For Security Sector Reform Success

    DTIC Science & Technology

    2016-05-26

    Advanced Military Studies United States Army Command and General Staff College Fort Leavenworth, Kansas 2016 Approved for public release...ACRONYM(S) School of Advanced Military Studies , Advanced Military Studies Program 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION...political and economic stability are required for Security Sector Reform (SSR) success over the long term. This study suggests that states with stable

  10. Intelligent Control and Health Monitoring. Chapter 3

    NASA Technical Reports Server (NTRS)

    Garg, Sanjay; Kumar, Aditya; Mathews, H. Kirk; Rosenfeld, Taylor; Rybarik, Pavol; Viassolo, Daniel E.

    2009-01-01

    Advanced model-based control architecture overcomes the limitations state-of-the-art engine control and provides the potential of virtual sensors, for example for thrust and stall margin. "Tracking filters" are used to adapt the control parameters to actual conditions and to individual engines. For health monitoring standalone monitoring units will be used for on-board analysis to determine the general engine health and detect and isolate sudden faults. Adaptive models open up the possibility of adapting the control logic to maintain desired performance in the presence of engine degradation or to accommodate any faults. Improved and new sensors are required to allow sensing at stations within the engine gas path that are currently not instrumented due in part to the harsh conditions including high operating temperatures and to allow additional monitoring of vibration, mass flows and energy properties, exhaust gas composition, and gas path debris. The environmental and performance requirements for these sensors are summarized.

  11. 40 CFR 98.164 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CEMS is not used to measure GHG emissions. (2) Fossil fuel consumption, when, pursuant to § 98.33(e), the owner or operator of a unit that uses CEMS to quantify CO2 emissions and that combusts both fossil...

  12. 40 CFR 98.164 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CEMS is not used to measure GHG emissions. (2) Fossil fuel consumption, when, pursuant to § 98.33(e), the owner or operator of a unit that uses CEMS to quantify CO2 emissions and that combusts both fossil...

  13. Closure and Post-Closure Care Requirements for Hazardous Waste Treatment, Storage and Disposal Facilities

    EPA Pesticide Factsheets

    When a hazardous waste management unit stops receiving waste at the end of its active life, it must be cleaned up, closed, monitored, and maintained in accordance with the Resource Conservation and Recovery Ac

  14. Installation and certification of continuous VOC emissions monitoring systems for a steel mill sinter plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, K.L.; Macak, J.J. III; Cioffi, J.

    1999-07-01

    The counties of Lake, Porter, and LaPorte in Northwest Indiana are classified as severe non-attainment for the ozone National Ambient Air Quality Standard (NAAQS). In response to the non-attainment problem, the Indiana Department of Environmental Management (IDEM) promulgated a number of regulations over the last several years. One of these rules requires steel mills with sinter plants to control and continuously monitor volatile organic compound (VOC) emissions from the facilities. One of the accepted compliance methods is to install and certify Continuous Emission Monitoring Systems (CEMS) to monitor VOC emissions and volumetric flow rate in order to generate a VOCmore » emission number in units of pounds per hour. Compliance with the regulation also requires that the sinter plants accurately monitor sinter production in order to determine compliance during the winter months, when the limits are based on pounds of VOC emissions per ton of sinter produced.« less

  15. Overview of Sensors and Needs for Environmental Monitoring

    PubMed Central

    Ho, Clifford K.; Robinson, Alex; Miller, David R.; Davis, Mary J.

    2005-01-01

    This paper surveys the needs associated with environmental monitoring and long-term environmental stewardship. Emerging sensor technologies are reviewed to identify compatible technologies for various environmental monitoring applications. The contaminants that are considered in this report are grouped into the following categories: (1) metals, (2) radioisotopes, (3) volatile organic compounds, and (4) biological contaminants. United States regulatory drivers are evaluated for different applications (e.g., drinking water, storm water, pretreatment, and air emissions), and sensor requirements are derived from these regulatory metrics. Sensor capabilities are then summarized according to contaminant type, and the applicability of the different sensors to various environmental monitoring applications is discussed.

  16. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  17. Volumetric modulated arc therapy vs. IMRT for the treatment of distal esophageal cancer.

    PubMed

    Van Benthuysen, Liam; Hales, Lee; Podgorsak, Matthew B

    2011-01-01

    Several studies have demonstrated that volumetric modulated arc therapy (VMAT) has the ability to reduce monitor units and treatment time when compared with intensity-modulated radiation therapy (IMRT). This study aims to demonstrate that VMAT is able to provide adequate organs at risk (OAR) sparing and planning target volume (PTV) coverage for adenocarcinoma of the distal esophagus while reducing monitor units and treatment time. Fourteen patients having been treated previously for esophageal cancer were planned using both VMAT and IMRT techniques. Dosimetric quality was evaluated based on doses to several OARs, as well as coverage of the PTV. Treatment times were assessed by recording the number of monitor units required for dose delivery. Body V(5) was also recorded to evaluate the increased volume of healthy tissue irradiated to low doses. Dosimetric differences in OAR sparing between VMAT and IMRT were comparable. PTV coverage was similar for the 2 techniques but it was found that IMRT was capable of delivering a slightly more homogenous dose distribution. Of the 14 patients, 12 were treated with a single arc and 2 were treated with a double arc. Single-arc plans reduced monitor units by 42% when compared with the IMRT plans. Double-arc plans reduced monitor units by 67% when compared with IMRT. The V(5) for the body was found to be 18% greater for VMAT than for IMRT. VMAT has the capability to decrease treatment times over IMRT while still providing similar OAR sparing and PTV coverage. Although there will be a smaller risk of patient movement during VMAT treatments, this advantage comes at the cost of delivering small doses to a greater volume of the patient. Copyright © 2011 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nitao, J J

    The goal of the Event Reconstruction Project is to find the location and strength of atmospheric release points, both stationary and moving. Source inversion relies on observational data as input. The methodology is sufficiently general to allow various forms of data. In this report, the authors will focus primarily on concentration measurements obtained at point monitoring locations at various times. The algorithms being investigated in the Project are the MCMC (Markov Chain Monte Carlo), SMC (Sequential Monte Carlo) Methods, classical inversion methods, and hybrids of these. They refer the reader to the report by Johannesson et al. (2004) for explanationsmore » of these methods. These methods require computing the concentrations at all monitoring locations for a given ''proposed'' source characteristic (locations and strength history). It is anticipated that the largest portion of the CPU time will take place performing this computation. MCMC and SMC will require this computation to be done at least tens of thousands of times. Therefore, an efficient means of computing forward model predictions is important to making the inversion practical. In this report they show how Green's functions and reciprocal Green's functions can significantly accelerate forward model computations. First, instead of computing a plume for each possible source strength history, they can compute plumes from unit impulse sources only. By using linear superposition, they can obtain the response for any strength history. This response is given by the forward Green's function. Second, they may use the law of reciprocity. Suppose that they require the concentration at a single monitoring point x{sub m} due to a potential (unit impulse) source that is located at x{sub s}. instead of computing a plume with source location x{sub s}, they compute a ''reciprocal plume'' whose (unit impulse) source is at the monitoring locations x{sub m}. The reciprocal plume is computed using a reversed-direction wind field. The wind field and transport coefficients must also be appropriately time-reversed. Reciprocity says that the concentration of reciprocal plume at x{sub s} is related to the desired concentration at x{sub m}. Since there are many less monitoring points than potential source locations, the number of forward model computations is drastically reduced.« less

  19. Using data and quality monitoring to enhance maternity outcomes: a qualitative study of risk managers' perspectives.

    PubMed

    Simms, Rebecca A; Yelland, Andrew; Ping, Helen; Beringer, Antonia J; Draycott, Timothy J; Fox, Robert

    2014-06-01

    Risk management is a core part of healthcare practice, especially within maternity services, where litigation and societal costs are high. There has been little investigation into the experiences and opinions of those staff directly involved in risk management: lead obstetricians and specialist risk midwives, who are ideally placed to identify how current implementation of risk management strategies can be improved. A qualitative study of consultant-led maternity units in an English region. Semistructured interviews were conducted with the obstetric and midwifery risk management leads for each unit. We explored their approach to risk management, particularly their opinions regarding quality monitoring and related barriers/issues. Interviews were recorded, transcribed and thematically analysed. Twenty-seven staff from 12/15 maternity units participated. Key issues identified included: concern for the accuracy and validity of their local data, potential difficulties related to data collation, the negative impact of external interference by national regulatory bodies on local clinical priorities, the influence of the local culture of the maternity unit on levels of engagement in the risk management process, and scepticism about the value of benchmarking of maternity units without adjustment for population characteristics. Local maternity risk managers may provide valuable, clinically relevant insights into current issues in clinical data monitoring. Improvements should focus on the accuracy and ease of data collation with a need for an agreed maternity indicators set, populated from validated databases, and not reliant on data collection systems that distract clinicians from patient activity and quality improvement. It is clear that working relationships between risk managers, their own clinical teams and external national bodies require improvement and alignment. Further discussion regarding benchmarking between maternity units is required prior to implementation. These findings are likely to be relevant to other clinical specialties. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  20. Management of Complex Cardiac Issues in the Pregnant Patient.

    PubMed

    Hu, Huayong; Pasca, Ioana

    2016-01-01

    Management of peripartum heart disease in the intensive care unit requires optimization of maternal hemodynamics and maintenance of fetal perfusion. This requires fetal monitoring and should address the parturient's oxygen saturation, hemoglobin, and cardiac output as it relates to uterine blood flow. Pharmacologic strategies have limited evidence pertaining to hemodynamic stabilization and fetal perfusion. There is some evidence that surgical management of critical mitral stenosis should be percutaneous when possible because cardiac bypass is associated with increased fetal mortality. Fetal monitoring strategies should address central organ perfusion because peripheral scalp pH has not been associated with improved fetal outcomes. Copyright © 2016 Elsevier Inc. All rights reserved.

  1. 40 CFR 52.1923 - Best Available Retrofit Requirements (BART) for SO2 and Interstate pollutant transport provisions...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... combusted at any time at the steam generating unit. Daily average means the arithmetic average of the hourly... which may include, but is not limited to, monitoring results, review of operating and maintenance...

  2. 40 CFR Table 7 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... regeneration stream mass or volumetric flow during carbon bed regeneration cycle; and temperature of the carbon bed after regeneration (and within 15 minutes of completing any cooling cycle(s)) Maximum mass or...

  3. 40 CFR 62.15225 - What must I do if my continuous emission monitoring system is temporarily unavailable to meet the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Requirements for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Continuous... methods for collecting data when these systems malfunction or when repairs, calibration checks, or zero...

  4. 40 CFR 62.15225 - What must I do if my continuous emission monitoring system is temporarily unavailable to meet the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Requirements for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Continuous... methods for collecting data when these systems malfunction or when repairs, calibration checks, or zero...

  5. 40 CFR 62.15225 - What must I do if my continuous emission monitoring system is temporarily unavailable to meet the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Requirements for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Continuous... methods for collecting data when these systems malfunction or when repairs, calibration checks, or zero...

  6. 40 CFR 265.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... waste management units in one recordkeeping system if the system identifies each record by each...) Design documentation and monitoring, operating, and inspection information for each closed-vent system...) An up-to-date analysis and the supporting information and data used to determine whether or not...

  7. 40 CFR 60.4900 - What are the performance testing, monitoring, and calibration requirements for compliance with...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the units of the emission standard, or 5 parts per million dry volume absolute value of the mean... zero and span adjustments). Any such periods that you do not collect data using the continuous...

  8. 40 CFR 144.33 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... characteristics; (2) Within the same well field, facility site, reservoir, project, or similar unit in the same...) The requirements for construction, monitoring, reporting, operation, and abandonment, for all wells...; and (3) The cumulative effects of drilling and operation of additional injection wells are considered...

  9. Deployment Health

    DTIC Science & Technology

    2006-08-11

    thermo luminescent dosimeter ( TLD badge)) are required for performing specific tasks in a safe manner while deployed, personnel must be trained on the...monitoring devices (e.g., thermo luminescent dosimeter ( TLD badge)) as required by occupational specialty of personnel. (E4.A1.1.5.) 5.5.8 X X...assigned, attached, on temporary duty, or temporary additional duty to deployed units. Report the data electronically to the DMDC (at the SECRET level

  10. Space-based radar for the United Nations's international satellite monitoring agency

    NASA Astrophysics Data System (ADS)

    Cantafio, L. J.

    1984-12-01

    A session of the United Nations General Assembly was held in May and June 1978 with the objective to discuss questions related to disarmament. It was decided to consider the establishment of an international Satellite Monitoring Agency (ISMA). The arising questions were studied, and two reports were prepared concerning such a monitoring agency. One report contained preliminary conclusions on the technical, legal, and financial implications of establishing an ISMA, while the second report contained an in-depth study. It was found that from a technical point of view the project appeared possible and feasible, and that there were no provisions in the international law prohibiting the proposed activities. The present investigation has been conducted under the assumption that an ISMA will be estabished. Attention is given to the requirements for the ISMA, the space-based radar design, radar system tradeoff data, critical technologies, and system weight, cost and schedule.

  11. [Structure and functional organization of integrated cardiac intensive care].

    PubMed

    Scherillo, Marino; Miceli, Domenico; Tubaro, Marco; Guiducci, Umberto

    2007-05-01

    The early invasive strategy for the treatment of acute coronary syndromes and the increasing number of older and sicker patients requiring prolonged and more complex intensive care have induced many changes in the function of the intensive care units. These changes include the statement that specially trained cardiologists and cardiac nurses who can manage patients with acute cardiac conditions should staff the intensive care units. This document indicates the structure of the units and specific recommendations for the number of beds, monitoring system, respirators, pacemaker/defibrillators and additional equipment.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maxwell, Don E; Ezell, Matthew A; Becklehimer, Jeff

    While sites generally have systems in place to monitor the health of Cray computers themselves, often the cooling systems are ignored until a computer failure requires investigation into the source of the failure. The Liebert XDP units used to cool the Cray XE/XK models as well as the Cray proprietary cooling system used for the Cray XC30 models provide data useful for health monitoring. Unfortunately, this valuable information is often available only to custom solutions not accessible by a center-wide monitoring system or is simply ignored entirely. In this paper, methods and tools used to harvest the monitoring data availablemore » are discussed, and the implementation needed to integrate the data into a center-wide monitoring system at the Oak Ridge National Laboratory is provided.« less

  13. Microbial Monitoring from the Frontlines to Space: A Successful Validation of a Department of Defense (DoD) Funded Small Business Innovation Research (SBIR) Technology on Board the International Space Station (ISS)

    NASA Technical Reports Server (NTRS)

    Oubre, Cherie; Khodadad, Christina; Castro, Victoria; Ott, Mark; Pollack, Lawrence; Roman, Monsi

    2017-01-01

    The RAZOR EX (Registered Trademark) PCR unit was initially developed by the DoD as part of an SBIR project to detect and identify biothreats during field deployment. The system was evaluated by NASA as a commercial technology for future microbial monitoring requirements and has been successfully demonstrated in microgravity on-board the International Space Station.

  14. Proceedings of the symposium on assessing the industrial hygiene monitoring needs for the coal conversion and oil shale industries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, O. Jr.

    1979-03-01

    This work was supported by the United States Department of Energy, Division of Biomedical and Environmental Research, Analysis and Assessment Program, through the Safety and Environmental Protection Division at Brookhaven National Laboratory. The symposium program included presentations centering around the themes: Recognition of Occupational Health Monitoring Requirements for the Coal Conversion and Oil Shale Industries and Status of Dosimetry Technology for Occupational Health Monitoring for the Coal Conversion and Oil Shale Industries. Sixteen papers have been entered individually into EDB and ERA; six had been entered previously from other sources. (LTN)

  15. 40 CFR 141.704 - Analytical methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Analytical methods. 141.704 Section... Monitoring Requirements § 141.704 Analytical methods. (a) Cryptosporidium. Systems must analyze for Cryptosporidium using Method 1623: Cryptosporidium and Giardia in Water by Filtration/IMS/FA, 2005, United States...

  16. 40 CFR 141.704 - Analytical methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Analytical methods. 141.704 Section... Monitoring Requirements § 141.704 Analytical methods. (a) Cryptosporidium. Systems must analyze for Cryptosporidium using Method 1623: Cryptosporidium and Giardia in Water by Filtration/IMS/FA, 2005, United States...

  17. 40 CFR 141.704 - Analytical methods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Analytical methods. 141.704 Section... Monitoring Requirements § 141.704 Analytical methods. (a) Cryptosporidium. Systems must analyze for Cryptosporidium using Method 1623: Cryptosporidium and Giardia in Water by Filtration/IMS/FA, 2005, United States...

  18. Data collection and modeling requirements for assessing transportation impacts of micro-scale design : executive summary

    DOT National Transportation Integrated Search

    1997-08-01

    To learn how European countries monitor traffic, the Federal Highway Administration (FHWA) sponsor a scanning tour of the Netherlands, Switzerland, Germany, France and the United Kingdom in June 1996. The team focused on types of data collected, data...

  19. 40 CFR 141.704 - Analytical methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Analytical methods. 141.704 Section... Monitoring Requirements § 141.704 Analytical methods. (a) Cryptosporidium. Systems must analyze for Cryptosporidium using Method 1623: Cryptosporidium and Giardia in Water by Filtration/IMS/FA, 2005, United States...

  20. 40 CFR 141.704 - Analytical methods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Analytical methods. 141.704 Section... Monitoring Requirements § 141.704 Analytical methods. (a) Cryptosporidium. Systems must analyze for Cryptosporidium using Method 1623: Cryptosporidium and Giardia in Water by Filtration/IMS/FA, 2005, United States...

  1. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less

  2. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  3. Assessment of zero drift in the Codman intracranial pressure monitor: a study from 2 neurointensive care units.

    PubMed

    Al-Tamimi, Yahia Z; Helmy, Adel; Bavetta, Seb; Price, Stephen J

    2009-01-01

    Intraparenchymal monitoring devices play an important role in the daily management of head injury and other critically ill neurosurgical patients. Although zero drift data exist for the Camino system (Camino Laboratories, San Diego, CA), only in vitro data exist for the Codman system (Codman and Shurtleff, Inc., Raynham, MA). The aim of this study was to assess the extent of zero drift for the Codman intracranial pressure (ICP) monitor in patients being monitored in 2 neurointensive care units. This was a prospective study conducted at 2 neurointensive care units. Eighty-eight patients who required ICP monitoring and who presented to the 2 neurosurgical departments, Center 1 (n = 48) and Center 2 (n = 40), were recruited for participation. The duration of ICP monitoring was noted, as was the resultant pressure reading in normal saline on removing the ICP monitor (zero drift). The median absolute zero drift for the group was 2.0 mm Hg (interquartile range, 1-3 mm Hg). The median time in situ was 108 hours (interquartile range, 69-201 hours). There was a positive correlation between the drift and time of the probe spent in situ (Spearman's correlation coefficient = 0.342; P = 0.001). Of the readings, 20 and 2% showed a drift greater than 5 and 10 mm Hg in magnitude, respectively. These data demonstrate that a small amount of zero drift exists in ICP monitors and that this drift increases with time. The wide range in the data demonstrates that some drift readings are quite excessive. This reinforces the school of thought that, although ICP readings contribute significantly to the management of neurosurgical patients, they should be interpreted carefully and in conjunction with clinical and radiological assessment of patients.

  4. Current status and standards for establishment of hemodialysis units in Korea

    PubMed Central

    Lee, Young-Ki; Kim, Kiwon

    2013-01-01

    The number of hemodialysis patients and dialysis facilities is increasing each year, but there are no surveillance programs validating that the services and equipment of each hemodialysis unit meet specified safety and quality standards. There is a concern that excessive competition and illegal activities committed by some dialysis facilities may violate patients' right to health. Contrastingly, developed countries often have their own survey program to provide initial certification and monitoring to ensure that these clinics continue to meet basic requirements. Because hemodialysis units provide renal replacement therapy to critical patients suffering from severe chronic renal failure, appropriate legal regulation is important for the provision of initial certification and maintenance of facility, equipment, and human resource quality. Therefore, several standards providing minimum requirements for the area of hemodialysis unit, equipment for emergency care, physician and nurse staffs, water purification and quality management are urgently needed. PMID:23682218

  5. Space Station requirements for in-flight exercise countermeasures

    NASA Technical Reports Server (NTRS)

    Hayes, Judith C.; Harris, Bernard A.

    1990-01-01

    In an effort to retard the deleterious effects of space adaptation, NASA has defined requirements for an Exercise Countermeasure Facility (ECF) within the Space Station Crew Health Care System (CHeCS). The application of exercise as a countermeasure to spaceflight-induced deconditioning has been utilized in the past by both the United States and the Soviet space programs. The ECF will provide exercise hardware, physiological monitoring capabilities, and an interactive motivational display system. ECF operations and data will be coupled through the Space Station Freedom Data Management System for monitoring of inflight training and testing from ground control, thus allowing for real-time evaluation of crewmember performance and modification of exercise prescriptions. Finally, the objective of the ECF is to monitor and control the exercise of crewmembers for the maintenance of an operational level of fitness to ensure mission success.

  6. Personal customizing exercise with a wearable measurement and control unit.

    PubMed

    Wang, Zhihui; Kiryu, Tohru; Tamura, Naoki

    2005-06-28

    Recently, wearable technology has been used in various health-related fields to develop advanced monitoring solutions. However, the monitoring function alone cannot meet all the requirements of customizing machine-based exercise on an individual basis by relying on biosignal-based controls. We propose a new wearable unit design equipped with measurement and control functions to support the customization process. The wearable unit can measure the heart rate and electromyogram signals during exercise performance and output workload control commands to the exercise machines. The workload is continuously tracked with exercise programs set according to personally customized workload patterns and estimation results from the measured biosignals by a fuzzy control method. Exercise programs are adapted by relying on a computer workstation, which communicates with the wearable unit via wireless connections. A prototype of the wearable unit was tested together with an Internet-based cycle ergometer system to demonstrate that it is possible to customize exercise on an individual basis. We tested the wearable unit in nine people to assess its suitability to control cycle ergometer exercise. The results confirmed that the unit could successfully control the ergometer workload and continuously support gradual changes in physical activities. The design of wearable units equipped with measurement and control functions is an important step towards establishing a convenient and continuously supported wellness environment.

  7. Evaluation of 3 dental unit waterline contamination testing methods

    PubMed Central

    Porteous, Nuala; Sun, Yuyu; Schoolfield, John

    2015-01-01

    Previous studies have found inconsistent results from testing methods used to measure heterotrophic plate count (HPC) bacteria in dental unit waterline (DUWL) samples. This study used 63 samples to compare the results obtained from an in-office chairside method and 2 currently used commercial laboratory HPC methods (Standard Methods 9215C and 9215E). The results suggest that the Standard Method 9215E is not suitable for application to DUWL quality monitoring, due to the detection of limited numbers of heterotrophic organisms at the required 35°C incubation temperature. The results also confirm that while the in-office chairside method is useful for DUWL quality monitoring, the Standard Method 9215C provided the most accurate results. PMID:25574718

  8. Multileaf collimator performance monitoring and improvement using semiautomated quality control testing and statistical process control.

    PubMed

    Létourneau, Daniel; Wang, An; Amin, Md Nurul; Pearce, Jim; McNiven, Andrea; Keller, Harald; Norrlinger, Bernhard; Jaffray, David A

    2014-12-01

    High-quality radiation therapy using highly conformal dose distributions and image-guided techniques requires optimum machine delivery performance. In this work, a monitoring system for multileaf collimator (MLC) performance, integrating semiautomated MLC quality control (QC) tests and statistical process control tools, was developed. The MLC performance monitoring system was used for almost a year on two commercially available MLC models. Control charts were used to establish MLC performance and assess test frequency required to achieve a given level of performance. MLC-related interlocks and servicing events were recorded during the monitoring period and were investigated as indicators of MLC performance variations. The QC test developed as part of the MLC performance monitoring system uses 2D megavoltage images (acquired using an electronic portal imaging device) of 23 fields to determine the location of the leaves with respect to the radiation isocenter. The precision of the MLC performance monitoring QC test and the MLC itself was assessed by detecting the MLC leaf positions on 127 megavoltage images of a static field. After initial calibration, the MLC performance monitoring QC test was performed 3-4 times/week over a period of 10-11 months to monitor positional accuracy of individual leaves for two different MLC models. Analysis of test results was performed using individuals control charts per leaf with control limits computed based on the measurements as well as two sets of specifications of ± 0.5 and ± 1 mm. Out-of-specification and out-of-control leaves were automatically flagged by the monitoring system and reviewed monthly by physicists. MLC-related interlocks reported by the linear accelerator and servicing events were recorded to help identify potential causes of nonrandom MLC leaf positioning variations. The precision of the MLC performance monitoring QC test and the MLC itself was within ± 0.22 mm for most MLC leaves and the majority of the apparent leaf motion was attributed to beam spot displacements between irradiations. The MLC QC test was performed 193 and 162 times over the monitoring period for the studied units and recalibration had to be repeated up to three times on one of these units. For both units, rate of MLC interlocks was moderately associated with MLC servicing events. The strongest association with the MLC performance was observed between the MLC servicing events and the total number of out-of-control leaves. The average elapsed time for which the number of out-of-specification or out-of-control leaves was within a given performance threshold was computed and used to assess adequacy of MLC test frequency. A MLC performance monitoring system has been developed and implemented to acquire high-quality QC data at high frequency. This is enabled by the relatively short acquisition time for the images and automatic image analysis. The monitoring system was also used to record and track the rate of MLC-related interlocks and servicing events. MLC performances for two commercially available MLC models have been assessed and the results support monthly test frequency for widely accepted ± 1 mm specifications. Higher QC test frequency is however required to maintain tighter specification and in-control behavior.

  9. Whole blood coagulation analyzers.

    PubMed

    1997-08-01

    Whole blood Coagulation analyzers (WBCAs) are widely used point-of-care (POC) testing devices found primarily in cardiothoracic surgical suites and cardia catheterization laboratories. Most of these devices can perform a number of coagulation tests that provide information about a patient's blood clotting status. Clinicians use the results of the WBCA tests, which are available minutes after applying a blood sample, primarily to monitor the effectiveness of heparin therapy--an anticoagulation therapy used during cardiopulmonary bypass (CPB) surgery, angioplasty, hemodialysis, and other clinical procedures. In this study we evaluated five WBCAs from four suppliers. Our testing focused on the applications for which WBCAs are primarily used: Monitoring moderate to high heparin levels, as would be required, for example, during CPB are angioplasty. For this function, WCBAs are typically used to perform an activated clotting time (ACT) test or, as one supplier refers to its test, a heparin management test (HMT). All models included in this study offered an ACT test or an HMT. Monitoring low heparin levels, as would be required, for example,during hemodialysis. For this function, WBCAs would normally be used to perform either a low-range ACT (LACT) test or a whole blood activated partial thromboplastin time (WBAPTT) test. Most of the evaluated units could perform at least one of these tests; one unit did not offer either test and was therefore not rated for this application. We rated and ranked each evaluated model separately for each of these two applications. In addition, we provided a combined rating and ranking that considers the units' appropriateness for performing both application. We based our conclusions on a unit's performance and humans factor design, as determined by our testing, and on its five-year life-cycle cost, as determined by our net present value (NPV) analysis. While we rated all evaluated units acceptable for each appropriate category, we did identify some significant differences that enabled us to rank the units in order of preference. We have included a Selection, Purchasing, and use guide at the end of this study to help facilities identify the unit that will best meet their needs.

  10. A configurable electronics system for the ESS-Bilbao beam position monitors

    NASA Astrophysics Data System (ADS)

    Muguira, L.; Belver, D.; Etxebarria, V.; Varnasseri, S.; Arredondo, I.; del Campo, M.; Echevarria, P.; Garmendia, N.; Feuchtwanger, J.; Jugo, J.; Portilla, J.

    2013-09-01

    A versatile and configurable system has been developed in order to monitorize the beam position and to meet all the requirements of the future ESS-Bilbao Linac. At the same time the design has been conceived to be open and configurable so that it could eventually be used in different kinds of accelerators, independent of the charged particle, with minimal change. The design of the Beam Position Monitors (BPMs) system includes a test bench both for button-type pick-ups (PU) and striplines (SL), the electronic units and the control system. The electronic units consist of two main parts. The first part is an Analog Front-End (AFE) unit where the RF signals are filtered, conditioned and converted to base-band. The second part is a Digital Front-End (DFE) unit which is based on an FPGA board where the base-band signals are sampled in order to calculate the beam position, the amplitude and the phase. To manage the system a Multipurpose Controller (MC) developed at ESSB has been used. It includes the FPGA management, the EPICS integration and Archiver Instances. A description of the system and a comparison between the performance of both PU and SL BPM designs measured with this electronics system are fully described and discussed.

  11. 40 CFR 75.70 - NOX mass emissions provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applicable quality assurance requirements of those appendices. (f) Missing data procedures. Except as... owner or operator using a continuous emissions monitoring system, substitute for missing data in accordance with the applicable missing data procedures in §§ 75.31 through 75.37 whenever the unit combusts...

  12. 40 CFR 75.70 - NOX mass emissions provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applicable quality assurance requirements of those appendices. (f) Missing data procedures. Except as... owner or operator using a continuous emissions monitoring system, substitute for missing data in accordance with the applicable missing data procedures in §§ 75.31 through 75.37 whenever the unit combusts...

  13. 40 CFR 75.70 - NOX mass emissions provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applicable quality assurance requirements of those appendices. (f) Missing data procedures. Except as... owner or operator using a continuous emissions monitoring system, substitute for missing data in accordance with the applicable missing data procedures in §§ 75.31 through 75.37 whenever the unit combusts...

  14. 78 FR 59317 - Federal Acquisition Regulation; Ending Trafficking in Persons

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ..., emergency preparedness, safety equipment, sanitation and access to food and water. (g) A monitoring... supplies acquired, or the services required to be performed, outside the United States exceeds $500,000... involve services or supplies susceptible to trafficking. The compliance plan must be provided to the...

  15. 40 CFR 75.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), and carbon dioxide (CO2) emissions, volumetric flow, and opacity data from affected units under the... monitoring, recordkeeping, and reporting of NOX mass emissions with which EPA, individual States, or groups of States may require sources to comply in order to demonstrate compliance with a NOX mass emission...

  16. DEVELOPMENT OF REAL-TIME FLARE COMBUSTION EFFICIENCY MONITOR - PHASE I

    EPA Science Inventory

    There are approximately 7,000 flares in operation at industrial facilities across the United States. Flares are one of the largest Volatile Organic Compounds (VOCs) and air toxics emissions sources. Based on a special emission inventory required by the Texas Commission on E...

  17. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less

  18. Technology development for lunar base water recycling

    NASA Technical Reports Server (NTRS)

    Schultz, John R.; Sauer, Richard L.

    1992-01-01

    This paper will review previous and ongoing work in aerospace water recycling and identify research activities required to support development of a lunar base. The development of a water recycle system for use in the life support systems envisioned for a lunar base will require considerable research work. A review of previous work on aerospace water recycle systems indicates that more efficient physical and chemical processes are needed to reduce expendable and power requirements. Development work on biological processes that can be applied to microgravity and lunar environments also needs to be initiated. Biological processes are inherently more efficient than physical and chemical processes and may be used to minimize resupply and waste disposal requirements. Processes for recovering and recycling nutrients such as nitrogen, phosphorus, and sulfur also need to be developed to support plant growth units. The development of efficient water quality monitors to be used for process control and environmental monitoring also needs to be initiated.

  19. Instrumentation used for hydraulic testing of potential water-bearing formations at the Waste Isolation Pilot Plant site in southeastern New Mexico

    USGS Publications Warehouse

    Basler, J.A.

    1983-01-01

    Requirements for testing hydrologic test wells at the proposed Waste Isolation Pilot Plant near Carlsbad, New Mexico, necessitated the use of inflatable formation packers and pressure transducers. Observations during drilling and initial development indicated small formation yields which would require considerable test times by conventional open-casing methods. A pressure-monitoring system was assembled for performance evaluation utilizing commercially available components. Formation pressures were monitored with a down-hole strain-gage transducer. An inflatable packer equipped with a 1/4-inch-diameter steel tube extending through the inflation element permitted sensing formation pressures in isolated test zones. Surface components of the monitoring system provided AC transducer excitation, signal conditioning for recording directly in engineering units, and both analog and digital recording. Continuous surface monitoring of formation pressures provided a means of determining test status and projecting completion times during any phase of testing. Maximum portability was afforded by battery operation with all surface components mounted in a small self-contained trailer. (USGS)

  20. Monitoring vegetation phenology using MODIS

    USGS Publications Warehouse

    Zhang, Xiayong; Friedl, Mark A.; Schaaf, Crystal B.; Strahler, Alan H.; Hodges, John C.F.; Gao, Feng; Reed, Bradley C.; Huete, Alfredo

    2003-01-01

    Accurate measurements of regional to global scale vegetation dynamics (phenology) are required to improve models and understanding of inter-annual variability in terrestrial ecosystem carbon exchange and climate–biosphere interactions. Since the mid-1980s, satellite data have been used to study these processes. In this paper, a new methodology to monitor global vegetation phenology from time series of satellite data is presented. The method uses series of piecewise logistic functions, which are fit to remotely sensed vegetation index (VI) data, to represent intra-annual vegetation dynamics. Using this approach, transition dates for vegetation activity within annual time series of VI data can be determined from satellite data. The method allows vegetation dynamics to be monitored at large scales in a fashion that it is ecologically meaningful and does not require pre-smoothing of data or the use of user-defined thresholds. Preliminary results based on an annual time series of Moderate Resolution Imaging Spectroradiometer (MODIS) data for the northeastern United States demonstrate that the method is able to monitor vegetation phenology with good success.

  1. Crowdsensing in Smart Cities: Overview, Platforms, and Environment Sensing Issues.

    PubMed

    Alvear, Oscar; Calafate, Carlos T; Cano, Juan-Carlos; Manzoni, Pietro

    2018-02-04

    Evidence shows that Smart Cities are starting to materialise in our lives through the gradual introduction of the Internet of Things (IoT) paradigm. In this scope, crowdsensing emerges as a powerful solution to address environmental monitoring, allowing to control air pollution levels in crowded urban areas in a distributed, collaborative, inexpensive and accurate manner. However, even though technology is already available, such environmental sensing devices have not yet reached consumers. In this paper, we present an analysis of candidate technologies for crowdsensing architectures, along with the requirements for empowering users with air monitoring capabilities. Specifically, we start by providing an overview of the most relevant IoT architectures and protocols. Then, we present the general design of an off-the-shelf mobile environmental sensor able to cope with air quality monitoring requirements; we explore different hardware options to develop the desired sensing unit using readily available devices, discussing the main technical issues associated with each option, thereby opening new opportunities in terms of environmental monitoring programs.

  2. Crowdsensing in Smart Cities: Overview, Platforms, and Environment Sensing Issues

    PubMed Central

    2018-01-01

    Evidence shows that Smart Cities are starting to materialise in our lives through the gradual introduction of the Internet of Things (IoT) paradigm. In this scope, crowdsensing emerges as a powerful solution to address environmental monitoring, allowing to control air pollution levels in crowded urban areas in a distributed, collaborative, inexpensive and accurate manner. However, even though technology is already available, such environmental sensing devices have not yet reached consumers. In this paper, we present an analysis of candidate technologies for crowdsensing architectures, along with the requirements for empowering users with air monitoring capabilities. Specifically, we start by providing an overview of the most relevant IoT architectures and protocols. Then, we present the general design of an off-the-shelf mobile environmental sensor able to cope with air quality monitoring requirements; we explore different hardware options to develop the desired sensing unit using readily available devices, discussing the main technical issues associated with each option, thereby opening new opportunities in terms of environmental monitoring programs. PMID:29401711

  3. Web-Enabled Optoelectronic Particle-Fallout Monitor

    NASA Technical Reports Server (NTRS)

    Lineberger, Lewis P.

    2008-01-01

    A Web-enabled optoelectronic particle- fallout monitor has been developed as a prototype of future such instruments that (l) would be installed in multiple locations for which assurance of cleanliness is required and (2) could be interrogated and controlled in nearly real time by multiple remote users. Like prior particle-fallout monitors, this instrument provides a measure of particles that accumulate on a surface as an indication of the quantity of airborne particulate contaminants. The design of this instrument reflects requirements to: Reduce the cost and complexity of its optoelectronic sensory subsystem relative to those of prior optoelectronic particle fallout monitors while maintaining or improving capabilities; Use existing network and office computers for distributed display and control; Derive electric power for the instrument from a computer network, a wall outlet, or a battery; Provide for Web-based retrieval and analysis of measurement data and of a file containing such ancillary data as a log of command attempts at remote units; and Use the User Datagram Protocol (UDP) for maximum performance and minimal network overhead.

  4. SSV Launch Monitoring Strategies: HGDS Design Implementation Through System Maturity

    NASA Technical Reports Server (NTRS)

    Shoemaker, Marc D.; Crimi, Thomas

    2010-01-01

    With over 500,000 gallons of liquid hydrogen and liquid oxygen, it is of vital importance to monitor the space shuttle vehicle (SSV) from external tank (ET) load through launch. The Hazardous Gas Detection System (HGDS) was installed as the primary system responsible for monitoring fuel leaks within the orbiter and ET. The HGDS was designed to obtain the lowest possible detection limits with the best resolution while monitoring the SSV for any hydrogen, helium, oxygen, or argon as the main requirement. The HGDS is a redundant mass spectrometer used for real-time monitoring during Power Reactant Storage and Distribution (PRSD) load and ET load through launch or scrub. This system also performs SSV processing leak checks of the Tail Service Mast (TSM) umbilical quick disconnects (QD's), Ground Umbilical Carrier Plate (GUCP) QD's and supports auxiliary power unit (APU) system tests. From design to initial implementation and operations, the HGDS has evolved into a mature and reliable launch support system. This paper will discuss the operational challenges and lessons learned from facing design deficiencies, validation and maintenance efforts, life cycle issues, and evolving requirements

  5. Satellite water quality monitoring in coastal and estuarine waters: a look at SeaWiFS, MODIS, MERIS, and HICO

    EPA Science Inventory

    The United States Environmental Protection Agency’s charge to protect human health and the environment requires a long-term commitment to creating sustainable solutions to environmental problems. The most direct way to ensure that management practices are achieving sustainability...

  6. Windows on Achievement and Inequality. Policy Information Report

    ERIC Educational Resources Information Center

    Barton, Paul E.; Coley, Richard J.

    2008-01-01

    Shifting focus from typical data and information about the status of educational achievement in the United States and about gaps in achievement among the nation's students, this report undertakes investigation of less-frequently-asked questions. As required by the No Child Left Behind Act (NCLB), educators are continuously monitoring whether more…

  7. 40 CFR 63.104 - Heat exchange system requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry... subpart shall monitor each heat exchange system used to cool process equipment in a chemical manufacturing process unit meeting the conditions of § 63.100 (b)(1) through (b)(3) of this subpart, except for chemical...

  8. 40 CFR 63.104 - Heat exchange system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry... subpart shall monitor each heat exchange system used to cool process equipment in a chemical manufacturing process unit meeting the conditions of § 63.100 (b)(1) through (b)(3) of this subpart, except for chemical...

  9. 40 CFR 63.104 - Heat exchange system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Organic Hazardous Air Pollutants From the Synthetic Organic Chemical Manufacturing Industry... subpart shall monitor each heat exchange system used to cool process equipment in a chemical manufacturing process unit meeting the conditions of § 63.100 (b)(1) through (b)(3) of this subpart, except for chemical...

  10. 34 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs or projects can be readily quantified, this quantitative data should be related to cost data for... information including, when appropriate, analysis, and explanation of cost overruns or high unit costs. (e... requirements of 5 CFR part 1320 when requesting performance data from recipients. (Approved by the Office of...

  11. 50 CFR 300.45 - Vessel Monitoring System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... installers may be obtained from the Regional Administrator or the Administrator. (d) Hardware and software specifications. The VMS unit installed and carried on board a vessel to comply with the requirements of this section must consist of hardware and software that is approved by the Administrator and approved by NMFS...

  12. 50 CFR 300.45 - Vessel Monitoring System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... installers may be obtained from the Regional Administrator or the Administrator. (d) Hardware and software specifications. The VMS unit installed and carried on board a vessel to comply with the requirements of this section must consist of hardware and software that is approved by the Administrator and approved by NMFS...

  13. 50 CFR 300.45 - Vessel Monitoring System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... installers may be obtained from the Regional Administrator or the Administrator. (d) Hardware and software specifications. The VMS unit installed and carried on board a vessel to comply with the requirements of this section must consist of hardware and software that is approved by the Administrator and approved by NMFS...

  14. 40 CFR 75.1 - Purpose and scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... monitoring, recordkeeping, and reporting of NOX mass emissions with which EPA, individual States, or groups of States may require sources to comply in order to demonstrate compliance with a NOX mass emission... estimating SO2 mass emissions from gas-fired or oil-fired units and NOX emissions from gas-fired peaking or...

  15. High dependency units in the UK: variable size, variable character, few in number.

    PubMed Central

    Thompson, F. J.; Singer, M.

    1995-01-01

    An exploratory descriptive survey was conducted to determine the size and character of high dependency units (HDUs) in the UK. A telephone survey and subsequent postal questionnaire was sent to the 39 general HDUs in the UK determined by a recent survey from the Royal College of Anaesthetists; replies were received from 28. Most HDUs (82%, n = 23) were geographically distinct from the intensive care unit and varied in size from three to 13 beds, although only 64% (n = 18) reported that all beds were currently open. Nurse: patient ratios were at least 1:3. Fifty per cent of units had one or more designated consultants in charge, although only 11% (n = 3) had specifically designated consultant sessions. Junior medical cover was provided mainly by the on-call speciality term. Twenty units acted as a step-down facility for discharged intensive care unit patients and 21 offered a step-up facility for patients from general wards. Provision of facilities and levels of monitoring varied between these units. Few HDUs exist in the UK and they are variable in size and in the facilities and monitoring procedures which they provide. Future studies are urgently required to determine cost-effectiveness and outcome benefit of this intermediate care facility. Images p221-a PMID:7784281

  16. High dependency units in the UK: variable size, variable character, few in number.

    PubMed

    Thompson, F J; Singer, M

    1995-04-01

    An exploratory descriptive survey was conducted to determine the size and character of high dependency units (HDUs) in the UK. A telephone survey and subsequent postal questionnaire was sent to the 39 general HDUs in the UK determined by a recent survey from the Royal College of Anaesthetists; replies were received from 28. Most HDUs (82%, n = 23) were geographically distinct from the intensive care unit and varied in size from three to 13 beds, although only 64% (n = 18) reported that all beds were currently open. Nurse: patient ratios were at least 1:3. Fifty per cent of units had one or more designated consultants in charge, although only 11% (n = 3) had specifically designated consultant sessions. Junior medical cover was provided mainly by the on-call speciality term. Twenty units acted as a step-down facility for discharged intensive care unit patients and 21 offered a step-up facility for patients from general wards. Provision of facilities and levels of monitoring varied between these units. Few HDUs exist in the UK and they are variable in size and in the facilities and monitoring procedures which they provide. Future studies are urgently required to determine cost-effectiveness and outcome benefit of this intermediate care facility.

  17. Oximeter reliability in a subzero environment.

    PubMed

    Macnab, A J; Smith, M; Phillips, N; Smart, P

    1996-11-01

    Pulse oximeters optimize care in the pre-hospital setting. As British Columbia ambulance teams often provide care in subzero temperatures, we conducted a study to determine the reliability of 3 commercially-available portable oximeters in a subzero environment. We hypothesized that there is no significant difference between SaO2 readings obtained using a pulse oximeter at room temperature and a pulse oximeter operating at sub-zero temperatures. Subjects were stable normothermic children in intensive care on Hewlett Packard monitors (control unit) at room temperature. The test units were packed in dry ice in an insulated bin (temperature - 15 degrees C to -30 degrees C) and their sensors placed on the subjects, contralateral to the control sensors. Data were collected simultaneously from test and control units immediately following validation of control unit values by co-oximetry (blood gas). No data were unacceptable. Two units (Propaq 106EC and Nonin 8500N) functioned well to < -15 degrees C, providing data comparable to those obtained from the control unit (p < 0.001). The Siemens Micro O2 did not function at the temperatures tested. Monitor users who require equipment to function in subzero environments (military, Coast Guard, Mountain Rescue) should ensure that function is reliable, and could test units using this method.

  18. Comparison of geostatistical interpolation and remote sensing techniques for estimating long-term exposure to ambient PM2.5 concentrations across the continental United States.

    PubMed

    Lee, Seung-Jae; Serre, Marc L; van Donkelaar, Aaron; Martin, Randall V; Burnett, Richard T; Jerrett, Michael

    2012-12-01

    A better understanding of the adverse health effects of chronic exposure to fine particulate matter (PM2.5) requires accurate estimates of PM2.5 variation at fine spatial scales. Remote sensing has emerged as an important means of estimating PM2.5 exposures, but relatively few studies have compared remote-sensing estimates to those derived from monitor-based data. We evaluated and compared the predictive capabilities of remote sensing and geostatistical interpolation. We developed a space-time geostatistical kriging model to predict PM2.5 over the continental United States and compared resulting predictions to estimates derived from satellite retrievals. The kriging estimate was more accurate for locations that were about 100 km from a monitoring station, whereas the remote sensing estimate was more accurate for locations that were > 100 km from a monitoring station. Based on this finding, we developed a hybrid map that combines the kriging and satellite-based PM2.5 estimates. We found that for most of the populated areas of the continental United States, geostatistical interpolation produced more accurate estimates than remote sensing. The differences between the estimates resulting from the two methods, however, were relatively small. In areas with extensive monitoring networks, the interpolation may provide more accurate estimates, but in the many areas of the world without such monitoring, remote sensing can provide useful exposure estimates that perform nearly as well.

  19. Monitoring of livestock grazing effects on Bureau of Land Management land

    USGS Publications Warehouse

    Veblen, Kari E.; Pyke, David A.; Aldridge, Cameron L.; Casazza, Michael L.; Assal, Timothy J.; Farinha, Melissa A.

    2013-01-01

    Public land management agencies, such as the Bureau of Land Management (BLM), are charged with managing rangelands throughout the western United States for multiple uses, such as livestock grazing and conservation of sensitive species and their habitats. Monitoring of condition and trends of these rangelands, particularly with respect to effects of livestock grazing, provides critical information for effective management of these multiuse landscapes. We therefore investigated the availability of livestock grazing-related quantitative monitoring data and qualitative region-specific Land Health Standards (LHS) data across BLM grazing allotments in the western United States. We then queried university and federal rangeland science experts about how best to prioritize rangeland monitoring activities. We found that the most commonly available monitoring data were permittee-reported livestock numbers and season-of-use data (71% of allotments) followed by repeat photo points (58%), estimates of forage utilization (52%), and, finally, quantitative vegetation measurements (37%). Of the 57% of allotments in which LHS had been evaluated as of 2007, the BLM indicated 15% had failed to meet LHS due to livestock grazing. A full complement of all types of monitoring data, however, existed for only 27% of those 15%. Our data inspections, as well as conversations with rangeland experts, indicated a need for greater emphasis on collection of grazing-related monitoring data, particularly ground cover. Prioritization of where monitoring activities should be focused, along with creation of regional monitoring teams, may help improve monitoring. Overall, increased emphasis on monitoring of BLM rangelands will require commitment at multiple institutional levels.

  20. 75 FR 65975 - Exchange Visitor Program-Secondary School Students

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ...The Department is revising existing Secondary School Student regulations regarding the screening, selection, school enrollment, orientation, and quality assurance monitoring of exchange students as well as the screening, selection, orientation, and quality assurance monitoring of host families and field staff. Further, the Department is adopting a new requirement regarding training for all organizational representatives who place and/or monitor students with host families. The proposed requirement to conduct FBI fingerprint-based criminal background checks will not be implemented at this time. Rather, it will continue to be examined and a subsequent Final Rule regarding this provision will be forthcoming. These regulations, as revised, govern the Department designated exchange visitor programs under which foreign secondary school students (ages 15-18\\1/2\\) are afforded the opportunity to study in the United States at accredited public or private secondary schools for an academic semester or year while living with American host families or residing at accredited U.S. boarding schools.

  1. An evaluation of bilateral monitoring of cerebral oxygen saturation during pediatric cardiac surgery.

    PubMed

    Kussman, Barry D; Wypij, David; DiNardo, James A; Newburger, Jane; Jonas, Richard A; Bartlett, Jodi; McGrath, Ellen; Laussen, Peter C

    2005-11-01

    Cerebral oximetry is a technique that enables monitoring of regional cerebral oxygenation during cardiac surgery. In this study, we evaluated differences in bi-hemispheric measurement of cerebral oxygen saturation using near-infrared spectroscopy in 62 infants undergoing biventricular repair without aortic arch reconstruction. Left and right regional cerebral oxygen saturation index (rSO2i) were recorded continuously after the induction of anesthesia, and data were analyzed at 12 time points. Baseline rSO2i measurements were left 65 +/- 13 and right 66 +/- 13 (P = 0.17). Mean left and right rSO2i measurements were similar (< or =2 percentage points/absolute scale units) before, during, and after cardiopulmonary bypass, irrespective of the use of deep hypothermic circulatory arrest. Further longitudinal neurological outcome studies are required to determine whether uni- or bi-hemispheric monitoring is required in this patient population.

  2. The utility of conductive plastic electrodes in prolonged ICU EEG monitoring.

    PubMed

    Das, Rohit R; Lucey, Brendan P; Chou, Sherry H-Y; Espinosa, Patricio S; Zamani, Amir A; Dworetzky, Barbara A; Bromfield, Edward B; Lee, Jong Woo

    2009-01-01

    We investigated the feasibility and utilization of conductive plastic electrodes (CPEs) in patients undergoing continuous video-electroencephalographic (EEG) monitoring in the intensive care unit (ICU), and assessed the quality of brain magnetic resonance imaging (MRI) and computed tomography (CT) images obtained during this period. A total of 54 patients were monitored. Seizures were recorded in 16 patients. Twenty-five patients had neuroimaging performed with electrodes in place; 15 MRI and 23 CT scans were performed. All patients had excellent quality anatomical images without clinically significant artifacts, and without any signs or symptoms that raised safety concerns. Recording quality of the EEG was indistinguishable to that achieved with standard gold electrodes. The use of CPEs allowed for uninterrupted EEG recording of patients who required urgent neuroimaging, and decreased the amount of time spent by the technologists required to remove and reattach leads.

  3. A Proposed Material Requirements Planning System for NARF Alameda.

    DTIC Science & Technology

    1980-03-01

    7 AD-AGE’ 32 NAVAL POSTGRADUATE SCHOOL PONTEREY CA P/ 19/6 PROPOSED MATERIAL REQUIREMENTS PLANNING SYSTEM...ETC.(U)M R 80 EYLON, BARUCH...UNIT NUMMERS Naval Postgraduate School Monterey, California 93940 II1. CONTROLLING OFFICE NAME AND ADDRESS Naval Postgraduate School (/ -Mar8 k8/ x...Monterey, California 93940 - 74174 14. MONITORING AGENCY NAME I ADORISS(iI dillfui ter Contllind Ofle@) IS. SECURITY CLASS. (of thl -re.t) Naval

  4. Monitoring trends in bat populations of the United States and territories: Problems and prospects

    USGS Publications Warehouse

    O'Shea, T.J.; Bogan, M. A.

    2003-01-01

    Bats are ecologically and economically important mammals. The life histories of bats (particularly their low reproductive rates and the need for some species to gather in large aggregations at limited numbers of roosting sites) make their populations vulnerable to declines. Many of the species of bats in the United States (U.S.) and territories are categorized as endangered or threatened, have been candidates for such categories, or are considered species of concern. The importance and vulnerability of bat populations makes monitoring trends in their populations a goal for their future management. However, scientifically rigorous monitoring of bat populations requires well-planned, statistically defensible efforts. This volume reports findings of an expert workshop held to examine the topic of monitoring populations of bats. The workshop participants included leading experts in sampling and analysis of wildlife populations, as well as experts in the biology and conservation of bats. Findings are reported in this volume under two sections. Part I of the report presents contributed papers that provide overviews of past and current efforts at monitoring trends in populations of bats in the U.S. and territories. These papers consider current techniques and problems, and summarize what is known about the status and trends in populations of selected groups of bats. The contributed papers in Part I also include a description of the monitoring program developed for bat populations in the United Kingdom, a critique of monitoring programs in wildlife in general with recommendations for survey and sampling strategies, and a compilation and analysis of existing data on trends in bats of the U.S. and territories. Efforts directed at monitoring bat populations are piecemeal and have shortcomings. In Part II of the report, the workshop participants provide critical analyses of these problems and develop recommendations for improving methods, defining objectives and priorities, gaining mandates, and enhancing information exchange to facilitate future efforts for monitoring trends in U.S. bat populations.

  5. Efficient scalable solid-state neutron detector.

    PubMed

    Moses, Daniel

    2015-06-01

    We report on scalable solid-state neutron detector system that is specifically designed to yield high thermal neutron detection sensitivity. The basic detector unit in this system is made of a (6)Li foil coupled to two crystalline silicon diodes. The theoretical intrinsic efficiency of a detector-unit is 23.8% and that of detector element comprising a stack of five detector-units is 60%. Based on the measured performance of this detector-unit, the performance of a detector system comprising a planar array of detector elements, scaled to encompass effective area of 0.43 m(2), is estimated to yield the minimum absolute efficiency required of radiological portal monitors used in homeland security.

  6. [Duties of institutions and heads of health care centers in the area of infection control, information, assessment, registration and financing of benefits provided to TB patients].

    PubMed

    Zielonka, Tadeusz M

    2015-01-01

    The Act on preventing and counteracting infections and infectious diseases in humans effective in Poland requires the heads of health care outlets and institutions to counteract spreading of TB in units under their management. They are, by all means, responsible for monitoring infections in their respective units, including development, implementation and monitoring of the implementation of procedures into practice, aiming at limiting the dissemination of TB in hospitals and outpatient clinics. Medical service unit managers are also responsible for providing members of their staff with means of individual protection against infection with Mycobacterium tuberculosis bacillus. Their duties also include reporting all of the recognized TB cases in their respective units. TB is an infectious diseases included in the occupational disease list. Assessment of TB as an occupational disease is the responsibility of provincial TB prevention clinics. The Act also provides principles of financing of individual benefits available for the insured TB patients as well as those not insured.

  7. A fouling monitor alarm to prevent forced outages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, R.E.; Hickinbotham, A.; Fang, T.C.

    2000-07-01

    Many utilities rely on coal blending to meet emissions and boiler performance goals, but the increased variability in coal quality can adversely impact ash deposition and soot blowing requirements. Other utilities are experimenting with lower quality coals and burner zone blending of coals fired from different bunkers as part of a deregulation strategy to reduce fuel costs. However, these strategies can lead to slagging/fouling episodes, a possible outage, or a decrease in unit availability if boiler operations are not carefully monitored. This paper summarizes the development of software to monitor boiler fouling and to provide an advanced warning to themore » control operators when a fouling episode is imminent. With adequate warming, preemptive action can be taken (e.g., soot blowing, a change in coal blend, etc.) to potentially avoid a costly outage. The software utilizes a unique combination of combustion diagnostic techniques and convective section heat adsorption analyses to identify boiler operating conditions where ash deposition rates may be high and conductive to triggering a fouling episode. The paper outlines the history of the fouling problem and the implementation of the software on Wabamun Unit 4, a tangentially-fired unit with relatively narrow reheat tube spacing. The unit had a tendency to foul when burning a high alkaline (but low ash) coal seam. The paper discusses the software development, implementation, and data acquisitions activities. Preliminary test results are provided for Wabamun 4 and for Sundance Units 1 and 2 where the software was recently installed.« less

  8. Non-intrusive head movement analysis of videotaped seizures of epileptic origin.

    PubMed

    Mandal, Bappaditya; Eng, How-Lung; Lu, Haiping; Chan, Derrick W S; Ng, Yen-Ling

    2012-01-01

    In this work we propose a non-intrusive video analytic system for patient's body parts movement analysis in Epilepsy Monitoring Unit. The system utilizes skin color modeling, head/face pose template matching and face detection to analyze and quantify the head movements. Epileptic patients' heads are analyzed holistically to infer seizure and normal random movements. The patient does not require to wear any special clothing, markers or sensors, hence it is totally non-intrusive. The user initializes the person-specific skin color and selects few face/head poses in the initial few frames. The system then tracks the head/face and extracts spatio-temporal features. Support vector machines are then used on these features to classify seizure-like movements from normal random movements. Experiments are performed on numerous long hour video sequences captured in an Epilepsy Monitoring Unit at a local hospital. The results demonstrate the feasibility of the proposed system in pediatric epilepsy monitoring and seizure detection.

  9. Enterprise tools to promote interoperability: MonitoringResources.org supports design and documentation of large-scale, long-term monitoringprograms

    NASA Astrophysics Data System (ADS)

    Weltzin, J. F.; Scully, R. A.; Bayer, J.

    2016-12-01

    Individual natural resource monitoring programs have evolved in response to different organizational mandates, jurisdictional needs, issues and questions. We are establishing a collaborative forum for large-scale, long-term monitoring programs to identify opportunities where collaboration could yield efficiency in monitoring design, implementation, analyses, and data sharing. We anticipate these monitoring programs will have similar requirements - e.g. survey design, standardization of protocols and methods, information management and delivery - that could be met by enterprise tools to promote sustainability, efficiency and interoperability of information across geopolitical boundaries or organizational cultures. MonitoringResources.org, a project of the Pacific Northwest Aquatic Monitoring Partnership, provides an on-line suite of enterprise tools focused on aquatic systems in the Pacific Northwest Region of the United States. We will leverage on and expand this existing capacity to support continental-scale monitoring of both aquatic and terrestrial systems. The current stakeholder group is focused on programs led by bureaus with the Department of Interior, but the tools will be readily and freely available to a broad variety of other stakeholders. Here, we report the results of two initial stakeholder workshops focused on (1) establishing a collaborative forum of large scale monitoring programs, (2) identifying and prioritizing shared needs, (3) evaluating existing enterprise resources, (4) defining priorities for development of enhanced capacity for MonitoringResources.org, and (5) identifying a small number of pilot projects that can be used to define and test development requirements for specific monitoring programs.

  10. Personal customizing exercise with a wearable measurement and control unit

    PubMed Central

    Wang, Zhihui; Kiryu, Tohru; Tamura, Naoki

    2005-01-01

    Background Recently, wearable technology has been used in various health-related fields to develop advanced monitoring solutions. However, the monitoring function alone cannot meet all the requirements of customizing machine-based exercise on an individual basis by relying on biosignal-based controls. We propose a new wearable unit design equipped with measurement and control functions to support the customization process. Methods The wearable unit can measure the heart rate and electromyogram signals during exercise performance and output workload control commands to the exercise machines. The workload is continuously tracked with exercise programs set according to personally customized workload patterns and estimation results from the measured biosignals by a fuzzy control method. Exercise programs are adapted by relying on a computer workstation, which communicates with the wearable unit via wireless connections. A prototype of the wearable unit was tested together with an Internet-based cycle ergometer system to demonstrate that it is possible to customize exercise on an individual basis. Results We tested the wearable unit in nine people to assess its suitability to control cycle ergometer exercise. The results confirmed that the unit could successfully control the ergometer workload and continuously support gradual changes in physical activities. Conclusion The design of wearable units equipped with measurement and control functions is an important step towards establishing a convenient and continuously supported wellness environment. PMID:15982425

  11. Cycle chemistry monitoring system as means of improving the reliability of the equipment at the power plants

    NASA Astrophysics Data System (ADS)

    Yegoshina, O. V.; Voronov, V. N.; Yarovoy, V. O.; Bolshakova, N. A.

    2017-11-01

    There are many problems in domestic energy at the present that require urgent solutions in the near future. One of these problems - the aging of the main and auxiliary equipment. Wear of equipment is the cause of decrease reliability and efficiency of power plants. Reliability of the equipment are associated with the introduction of cycle chemistry monitoring system. The most damageable equipment’s are boilers (52.2 %), turbines (12.6 %) and heating systems (12.3 %) according to the review of failure rate on the power plants. The most part of the damageability of the boiler is heated surfaces (73.2 %). According to the Russian technical requirements, the monitoring systems are responsible to reduce damageability the boiler heating surfaces and to increase the reliability of the equipment. All power units capacity of over 50 MW are equipped with cycle chemistry monitoring systems in order to maintain water chemistry within operating limits. The main idea of cycle chemistry monitoring systems is to improve water chemistry at power plants. According to the guidelines, cycle chemistry monitoring systems of a single unit depends on its type (drum or once-through boiler) and consists of: 20…50 parameters of on-line chemical analyzers; 20…30 «grab» sample analyses (daily) and about 15…20 on-line monitored operating parameters. The operator of modern power plant uses with many data at different points of steam/water cycle. Operators do not can estimate quality of the cycle chemistry due to the large volume of daily and every shift information and dispersion of data, lack of systematization. In this paper, an algorithm for calculating the quality index developed for improving control the water chemistry of the condensate, feed water and prevent scaling and corrosion in the steam/water cycle.

  12. Hydrogen monitoring requirements in the global technical regulation on hydrogen and fuel cell vehicles

    DOE PAGES

    Buttner, William; Rivkin, C.; Burgess, R.; ...

    2017-02-04

    Here, the United Nations Economic Commission for Europe Global Technical Regulation (GTR) Number 13 ( Global Technical Regulation on Hydrogen and Fuel Cell Vehicles) is the defining document regulating safety requirements in hydrogen vehicles, and in particular, fuel cell electric vehicles (FCEVs). GTR Number 13 has been formally adopted and will serve as the basis for the national regulatory standards for FCEV safety in North America (led by the United States), Japan, Korea, and the European Union. The GTR defines safety requirements for these vehicles, including specifications on the allowable hydrogen levels in vehicle enclosures during in-use and post-crash conditionsmore » and on the allowable hydrogen emissions levels in vehicle exhaust during certain modes of normal operation. However, in order to be incorporated into national regulations, that is, to be legally binding, methods to verify compliance with the specific requirements must exist. In a collaborative program, the Sensor Laboratories at the National Renewable Energy Laboratory in the United States and the Joint Research Centre, Institute for Energy and Transport in the Netherlands have been evaluating and developing analytical methods that can be used to verify compliance with the hydrogen release requirements as specified in the GTR.« less

  13. Multileaf collimator performance monitoring and improvement using semiautomated quality control testing and statistical process control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; McNiven, Andrea; Keller, Harald

    2014-12-15

    Purpose: High-quality radiation therapy using highly conformal dose distributions and image-guided techniques requires optimum machine delivery performance. In this work, a monitoring system for multileaf collimator (MLC) performance, integrating semiautomated MLC quality control (QC) tests and statistical process control tools, was developed. The MLC performance monitoring system was used for almost a year on two commercially available MLC models. Control charts were used to establish MLC performance and assess test frequency required to achieve a given level of performance. MLC-related interlocks and servicing events were recorded during the monitoring period and were investigated as indicators of MLC performance variations. Methods:more » The QC test developed as part of the MLC performance monitoring system uses 2D megavoltage images (acquired using an electronic portal imaging device) of 23 fields to determine the location of the leaves with respect to the radiation isocenter. The precision of the MLC performance monitoring QC test and the MLC itself was assessed by detecting the MLC leaf positions on 127 megavoltage images of a static field. After initial calibration, the MLC performance monitoring QC test was performed 3–4 times/week over a period of 10–11 months to monitor positional accuracy of individual leaves for two different MLC models. Analysis of test results was performed using individuals control charts per leaf with control limits computed based on the measurements as well as two sets of specifications of ±0.5 and ±1 mm. Out-of-specification and out-of-control leaves were automatically flagged by the monitoring system and reviewed monthly by physicists. MLC-related interlocks reported by the linear accelerator and servicing events were recorded to help identify potential causes of nonrandom MLC leaf positioning variations. Results: The precision of the MLC performance monitoring QC test and the MLC itself was within ±0.22 mm for most MLC leaves and the majority of the apparent leaf motion was attributed to beam spot displacements between irradiations. The MLC QC test was performed 193 and 162 times over the monitoring period for the studied units and recalibration had to be repeated up to three times on one of these units. For both units, rate of MLC interlocks was moderately associated with MLC servicing events. The strongest association with the MLC performance was observed between the MLC servicing events and the total number of out-of-control leaves. The average elapsed time for which the number of out-of-specification or out-of-control leaves was within a given performance threshold was computed and used to assess adequacy of MLC test frequency. Conclusions: A MLC performance monitoring system has been developed and implemented to acquire high-quality QC data at high frequency. This is enabled by the relatively short acquisition time for the images and automatic image analysis. The monitoring system was also used to record and track the rate of MLC-related interlocks and servicing events. MLC performances for two commercially available MLC models have been assessed and the results support monthly test frequency for widely accepted ±1 mm specifications. Higher QC test frequency is however required to maintain tighter specification and in-control behavior.« less

  14. Evaluating the frequency of vital sign monitoring during blood transfusion: an evidence-based practice initiative.

    PubMed

    DeYoung Sullivan, Karen; Vu, Truc; Richardson, Goley; Castillo, Estella; Martinez, Fernando

    2015-10-01

    Patients with cancer are often dependent on blood transfusions during treatment. Frequent vital sign monitoring during transfusions may interrupt sleep and the patient's ability to ambulate or participate in unit activities. Relying heavily on vital sign findings may also overshadow unmeasurable symptoms of transfusion reaction. The aim of this evidence-based practice initiative was to examine the evidence regarding the optimum frequency of vital sign monitoring for patients undergoing stem cell transplantation receiving blood products and to amend policy and practice to be consistent with the literature. 
AT A GLANCE
: Patients with cancer frequently require transfusion support during treatment.Inconsistencies exist in recommendations for the frequency of vital sign monitoring during transfusion.Examining best practice guidelines suggests that less frequent vital sign monitoring may be appropriate if coupled with thoughtful physiologic assessment.

  15. 76 FR 41763 - Proposed Information Collection; Comment Request; Alaska Region Logbook Family of Forms

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... (NMFS) Alaska Region manages the United States (U.S.) groundfish fisheries of the Exclusive Economic... monitoring of the groundfish fisheries of the EEZ off Alaska. II. Method of Collection Paper and electronic logbooks, paper and electronic reports, and telephone calls are required from participants, and methods of...

  16. 40 CFR 65.149 - Boilers and process heaters.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... stream is not introduced as or with the primary fuel, a temperature monitoring device in the fire box...-throughput transfer racks, as applicable, shall meet the requirements of this section. (2) The vent stream... thermal units per hour) or greater. (ii) A boiler or process heater into which the vent stream is...

  17. 40 CFR 60.4870 - How do I establish my operating limits?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Sewage Sludge Incineration Units Initial Compliance Requirements § 60.4870 How do I establish my... compliance with the emission limit for particulate matter, cadmium, and lead. (4) For an activated carbon... limit and monitor sorbent injection rate and carrier gas flow rate (or carrier gas pressure drop) if you...

  18. 40 CFR 60.4870 - How do I establish my operating limits?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Sewage Sludge Incineration Units Initial Compliance Requirements § 60.4870 How do I establish my... compliance with the emission limit for particulate matter, cadmium, and lead. (4) For an activated carbon... limit and monitor sorbent injection rate and carrier gas flow rate (or carrier gas pressure drop) if you...

  19. 40 CFR 60.4870 - How do I establish my operating limits?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Sewage Sludge Incineration Units Initial Compliance Requirements § 60.4870 How do I establish my... compliance with the emission limit for particulate matter, cadmium, and lead. (4) For an activated carbon... limit and monitor sorbent injection rate and carrier gas flow rate (or carrier gas pressure drop) if you...

  20. 40 CFR 60.4870 - How do I establish my operating limits?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Sewage Sludge Incineration Units Initial Compliance Requirements § 60.4870 How do I establish my... compliance with the emission limit for particulate matter, cadmium, and lead. (4) For an activated carbon... limit and monitor sorbent injection rate and carrier gas flow rate (or carrier gas pressure drop) if you...

  1. 78 FR 50110 - Notice of Lodging Proposed Consent Decree

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Enterprises, Inc., Civil Action No. 5:13-cv-916 (GLS/DEP) was lodged with the United States District Court for... impose civil penalties against the Defendants for violating the Clean Water Act by discharging pollutants... by requiring the Defendants to restore and monitor the impacted areas and to pay a civil penalty. The...

  2. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... fossil fuel subcategory or the unit designed to burn heavy liquid subcategory and has an average annual heat input rate greater than 250 MMBtu per hour from solid fossil fuel and/or heavy liquid, and you... Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters Testing, Fuel...

  3. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... fossil fuel subcategory or the unit designed to burn heavy liquid subcategory and has an average annual heat input rate greater than 250 MMBtu per hour from solid fossil fuel and/or heavy liquid, and you... Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters Testing, Fuel...

  4. 40 CFR 60.1270 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Performance Specification 1 in appendix B of this part. Complete the evaluation within 60 days after your...

  5. Joint Annual Forest Inventory and Monitoring System

    Treesearch

    Ronald E. McRoberts

    1999-01-01

    The Renewable Forest and Rangeland Resources Planning Act of 1978 requires that the USDA Forest Service conduct periodic inventories of forestland in the United States to determine its extent and condition and the volume of standing timber, timber growth, and timber depletions. Five separate Forest Inventory and Analysis (FIA) programs, located in USDA Forest Service...

  6. Coal conversion processes and analysis methodologies for synthetic fuels production. [technology assessment and economic analysis of reactor design for coal gasification

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information to identify viable coal gasification and utilization technologies is presented. Analysis capabilities required to support design and implementation of coal based synthetic fuels complexes are identified. The potential market in the Southeast United States for coal based synthetic fuels is investigated. A requirements analysis to identify the types of modeling and analysis capabilities required to conduct and monitor coal gasification project designs is discussed. Models and methodologies to satisfy these requirements are identified and evaluated, and recommendations are developed. Requirements for development of technology and data needed to improve gasification feasibility and economies are examined.

  7. A gas flow indicator for portable life support systems

    NASA Technical Reports Server (NTRS)

    Bass, R. L., III; Schroeder, E. C.

    1975-01-01

    A three-part program was conducted to develop a gas flow indicator (GFI) to monitor ventilation flow in a portable life support system. The first program phase identified concepts which could potentially meet the GFI requirements. In the second phase, a working breadboard GFI, based on the concept of a pressure sensing diaphragm-aneroid assembly connected to a venturi, was constructed and tested. Extensive testing of the breadboard GFI indicated that the design would meet all NASA requirements including eliminating problems experienced with the ventilation flow sensor used in the Apollo program. In the third program phase, an optimized GFI was designed by utilizing test data obtained on the breadboard unit. A prototype unit was constructed using prototype materials and fabrication techniques, and performance tests indicated that the prototype GFI met or exceeded all requirements.

  8. 'There were more wires than him': the potential for wireless patient monitoring in neonatal intensive care.

    PubMed

    Bonner, Oliver; Beardsall, Kathryn; Crilly, Nathan; Lasenby, Joan

    2017-02-01

    The neonatal intensive care unit (NICU) can be one of the most stressful hospital environments. Alongside providing intensive clinical care, it is important that parents have the opportunity for regular physical contact with their babies because the neonatal period is critical for parent-child bonding. At present, monitoring technology in the NICU requires multiple wired sensors to track each baby's vital signs. This study describes the experiences that parents and nurses have with the current monitoring methods, and reports on their responses to the concept of a wireless monitoring system. Semistructured interviews were conducted with six parents, each of whom had babies on the unit, and seven nurses who cared for those babies. The interviews initially focused on the participants' experiences of the current wired system and then on their responses to the concept of a wireless system. The transcripts were analysed using a general inductive approach to identify relevant themes. Participants reported on physical and psychological barriers to parental care, the ways in which the current system obstructed the efficient delivery of clinical care and the perceived benefits and risks of a wireless system. The parents and nurses identified that the wires impeded baby-parent bonding; physically and psychologically. While a wireless system was viewed as potentially enabling greater interaction, staff and parents highlighted potential concerns, including the size, weight and battery life of any new device. The many wires required to safely monitor babies within the NICU creates a negative environment for parents at a critical developmental period, in terms of physical and psychological interactions. Nurses also experience challenges with the existing system, which could negatively impact the clinical care delivery. Developing a wireless system could overcome these barriers, but there remain challenges in designing a device suitable for this unique environment.

  9. Year 5 Post-Remediation Biomonitoring of Pesticides and other Contaminants in Marine Waters near the United Heckathorn Superfund Site, Richmond, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohn, Nancy P.; Kropp, Roy K.

    Marine sediment remediation at the United Heckathorn Superfund Site in Richmond, California, was completed in April 1997. The Record of Decision included a requirement for five years of post-remediation monitoring be conducted in the waterways near the site. The present monitoring year, 2001? 2002, is the fifth and possibly final year of post-remediation monitoring. In March 2002, water and mussel tissues were collected from the four stations in and near Lauritzen Channel that have been routinely monitored since 1997-98. A fifth station in Parr Canal was sampled in Year 5 to document post-remediation water and tissue concentrations there. Dieldrin andmore » dichlorodiphenyl trichloroethane (DDT) were analyzed in water samples and in tissue samples from resident (i.e., naturally occurring) mussels. As in Years 3 and 4, mussels were not transplanted to the study area in Year 5. Year 5 concentrations of dieldrin and total DDT in water and total DDT in tissue were compared with those from Years 1 through 4 of post-remediation monitoring, and with preremediation data from the California State Mussel Watch Program and the Ecological Risk Assessment for the United Heckathorn Superfund Site. Year 5 water samples and mussel tissues were also analyzed for polychlorinated biphenyls (PCB), which were detected in sediment samples during Year 2 monitoring and were added to the water and mussel tissue analyses in 1999. Contaminants of concern in Year 5 water samples were analyzed in both bulk (total) phase and dissolved phase, as were total suspended solids, to evaluate the contribution of particulates to the total contaminant concentration.« less

  10. A GPS-based Real-time Road Traffic Monitoring System

    NASA Astrophysics Data System (ADS)

    Tanti, Kamal Kumar

    In recent years, monitoring systems are astonishingly inclined towards ever more automatic; reliably interconnected, distributed and autonomous operation. Specifically, the measurement, logging, data processing and interpretation activities may be carried out by separate units at different locations in near real-time. The recent evolution of mobile communication devices and communication technologies has fostered a growing interest in the GIS & GPS-based location-aware systems and services. This paper describes a real-time road traffic monitoring system based on integrated mobile field devices (GPS/GSM/IOs) working in tandem with advanced GIS-based application software providing on-the-fly authentications for real-time monitoring and security enhancement. The described system is developed as a fully automated, continuous, real-time monitoring system that employs GPS sensors and Ethernet and/or serial port communication techniques are used to transfer data between GPS receivers at target points and a central processing computer. The data can be processed locally or remotely based on the requirements of client’s satisfaction. Due to the modular architecture of the system, other sensor types may be supported with minimal effort. Data on the distributed network & measurements are transmitted via cellular SIM cards to a Control Unit, which provides for post-processing and network management. The Control Unit may be remotely accessed via an Internet connection. The new system will not only provide more consistent data about the road traffic conditions but also will provide methods for integrating with other Intelligent Transportation Systems (ITS). For communication between the mobile device and central monitoring service GSM technology is used. The resulting system is characterized by autonomy, reliability and a high degree of automation.

  11. Civionics specifications for fiber optic sensors for structural health monitoring

    NASA Astrophysics Data System (ADS)

    Rivera, Evangeline; Mufti, Aftab A.; Thomson, Douglas J.

    2004-07-01

    As the design and construction of civil structures continue to evolve, it is becoming imperative that these structures be monitored for their health. In order to meet this need, the discipline of Civionics has emerged. It involves the applications to civil structures and aims to assist engineers in realizing the full benefits of structural health monitoring (SHM). Therefore, the goal of the specification outlined in this work is to ensure that correct installation and operating of fiber optic sensors, such as bridges, will be discussed that motivated the writing of these specifications. The main reason for the failure of FOS based monitoring systems can be traced directly to the installation of the fiber sensor itself. Therefore, by creating a standard procedure for SHM, several ambiguities are eliminated such as fiber sensor specifications and the types of cables required. As a result, these specifications will help ensure that the sensors will survive the installation process and eventually prove their value over years of monitoring the health of the structure. The Civionics FOS specifications include the requirements for fiber sensors, specifically Bragg grating sensors, and their corresponding readout unit. It also includes specifications on the cables, conduits, junction boxes, cable termination and the environmental.

  12. Negligible senescence: how will we know it when we see it?

    PubMed

    Heward, Christopher B

    2006-01-01

    The recent public claim that "SENS is a practical, foreseeable approach to curing aging" has stirred considerable controversy among bio-gerontologists. Testing this hypothesis will not only require precise definitions for the somewhat subjective terms "practical," "foreseeable," and "curing," it will require a precise definition of the term "aging." To facilitate proper experimental design, this definition must focus on the nature of aging itself, not its causes or consequences. Aging in mammals is a process that begins early in adult life and continues steadily thereafter until death. It is manifested by a decline in the functional capacity (or, more precisely, reserve capacity) of a variety of vital physiologic systems leading to increasing risk of morbidity and mortality over time. Aging, however, cannot be measured by simply monitoring morbidity and/or mortality. Aging can only be measured by monitoring the decline of global functional capacity itself. This, in turn, will require an operational definition of aging expressed as a rate function (i.e., it will have units expressing aging as an overall rate of functional change per unit time). Widespread acceptance of such global indexes of aging rate in animal models and humans will greatly facilitate research activity specifically designed to increase the understanding of aging mechanisms and antiaging interventions.

  13. Digital Image Correlation for Performance Monitoring

    NASA Technical Reports Server (NTRS)

    Palaviccini, Miguel; Turner, Dan; Herzberg, Michael

    2016-01-01

    Evaluating the health of a mechanism requires more than just a binary evaluation of whether an operation was completed. It requires analyzing more comprehensive, full-field data. Health monitoring is a process of non-destructively identifying characteristics that indicate the fitness of an engineered component. In order to monitor unit health in a production setting, an automated test system must be created to capture the motion of mechanism parts in a real-time and non-intrusive manner. One way to accomplish this is by using high-speed video and Digital Image Correlation (DIC). In this approach, individual frames of the video are analyzed to track the motion of mechanism components. The derived performance metrics allow for state-of-health monitoring and improved fidelity of mechanism modeling. The results are in-situ state-of-health identification and performance prediction. This paper introduces basic concepts of this test method, and discusses two main themes: the use of laser marking to add fiducial patterns to mechanism components, and new software developed to track objects with complex shapes, even as they move behind obstructions. Finally, the implementation of these tests into an automated tester is discussed.

  14. Dynamic Task Optimization in Remote Diabetes Monitoring Systems.

    PubMed

    Suh, Myung-Kyung; Woodbridge, Jonathan; Moin, Tannaz; Lan, Mars; Alshurafa, Nabil; Samy, Lauren; Mortazavi, Bobak; Ghasemzadeh, Hassan; Bui, Alex; Ahmadi, Sheila; Sarrafzadeh, Majid

    2012-09-01

    Diabetes is the seventh leading cause of death in the United States, but careful symptom monitoring can prevent adverse events. A real-time patient monitoring and feedback system is one of the solutions to help patients with diabetes and their healthcare professionals monitor health-related measurements and provide dynamic feedback. However, data-driven methods to dynamically prioritize and generate tasks are not well investigated in the domain of remote health monitoring. This paper presents a wireless health project (WANDA) that leverages sensor technology and wireless communication to monitor the health status of patients with diabetes. The WANDA dynamic task management function applies data analytics in real-time to discretize continuous features, applying data clustering and association rule mining techniques to manage a sliding window size dynamically and to prioritize required user tasks. The developed algorithm minimizes the number of daily action items required by patients with diabetes using association rules that satisfy a minimum support, confidence and conditional probability thresholds. Each of these tasks maximizes information gain, thereby improving the overall level of patient adherence and satisfaction. Experimental results from applying EM-based clustering and Apriori algorithms show that the developed algorithm can predict further events with higher confidence levels and reduce the number of user tasks by up to 76.19 %.

  15. Dynamic Task Optimization in Remote Diabetes Monitoring Systems

    PubMed Central

    Suh, Myung-kyung; Woodbridge, Jonathan; Moin, Tannaz; Lan, Mars; Alshurafa, Nabil; Samy, Lauren; Mortazavi, Bobak; Ghasemzadeh, Hassan; Bui, Alex; Ahmadi, Sheila; Sarrafzadeh, Majid

    2016-01-01

    Diabetes is the seventh leading cause of death in the United States, but careful symptom monitoring can prevent adverse events. A real-time patient monitoring and feedback system is one of the solutions to help patients with diabetes and their healthcare professionals monitor health-related measurements and provide dynamic feedback. However, data-driven methods to dynamically prioritize and generate tasks are not well investigated in the domain of remote health monitoring. This paper presents a wireless health project (WANDA) that leverages sensor technology and wireless communication to monitor the health status of patients with diabetes. The WANDA dynamic task management function applies data analytics in real-time to discretize continuous features, applying data clustering and association rule mining techniques to manage a sliding window size dynamically and to prioritize required user tasks. The developed algorithm minimizes the number of daily action items required by patients with diabetes using association rules that satisfy a minimum support, confidence and conditional probability thresholds. Each of these tasks maximizes information gain, thereby improving the overall level of patient adherence and satisfaction. Experimental results from applying EM-based clustering and Apriori algorithms show that the developed algorithm can predict further events with higher confidence levels and reduce the number of user tasks by up to 76.19 %. PMID:27617297

  16. Deriving a GPS Monitoring Time Recommendation for Physical Activity Studies of Adults.

    PubMed

    Holliday, Katelyn M; Howard, Annie Green; Emch, Michael; Rodríguez, Daniel A; Rosamond, Wayne D; Evenson, Kelly R

    2017-05-01

    Determining locations of physical activity (PA) is important for surveillance and intervention development, yet recommendations for using location recording tools like global positioning system (GPS) units are lacking. Specifically, no recommendation exists for the number of days study participants should wear a GPS to reliably estimate PA time spent in locations. This study used data from participants (N = 224, age = 18-85 yr) in five states who concurrently wore an ActiGraph GT1M accelerometer and a Qstarz BT-Q1000X GPS for three consecutive weeks to construct monitoring day recommendations through variance partitioning methods. PA bouts ≥10 min were constructed from accelerometer counts, and the location of GPS points was determined using a hand-coding protocol. Monitoring day recommendations varied by the type of location (e.g., participant homes vs parks) and the intensity of PA bouts considered (low and medium cut point moderate to vigorous PA [MVPA] bouts or high cut point vigorous PA [VPA] bouts). In general, minutes of all PA intensities spent in a given location could be measured with ≥80% reliability using 1-3 d of GPS monitoring for fitness facilities, schools, and footpaths. MVPA bout minutes in parks and roads required longer monitoring periods of 5-12 d. PA in homes and commercial areas required >19 d of monitoring. Twelve days of monitoring was found to reliably estimate minutes in both low and medium threshold MVPA as well as VPA bouts for many important built environment locations that can be targeted to increase PA at the population level. Minutes of PA in the home environment and commercial locations may be best assessed through other means given the lengthy estimated monitoring time required.

  17. A sampling design framework for monitoring secretive marshbirds

    USGS Publications Warehouse

    Johnson, D.H.; Gibbs, J.P.; Herzog, M.; Lor, S.; Niemuth, N.D.; Ribic, C.A.; Seamans, M.; Shaffer, T.L.; Shriver, W.G.; Stehman, S.V.; Thompson, W.L.

    2009-01-01

    A framework for a sampling plan for monitoring marshbird populations in the contiguous 48 states is proposed here. The sampling universe is the breeding habitat (i.e. wetlands) potentially used by marshbirds. Selection protocols would be implemented within each of large geographical strata, such as Bird Conservation Regions. Site selection will be done using a two-stage cluster sample. Primary sampling units (PSUs) would be land areas, such as legal townships, and would be selected by a procedure such as systematic sampling. Secondary sampling units (SSUs) will be wetlands or portions of wetlands in the PSUs. SSUs will be selected by a randomized spatially balanced procedure. For analysis, the use of a variety of methods as a means of increasing confidence in conclusions that may be reached is encouraged. Additional effort will be required to work out details and implement the plan.

  18. POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 110: AREA 3 WMD U-3AX/BL CRATER, NEVADA TEST SITE, NEVADA FOR THE PERIOD JULY 2004 - JUNE 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2005-08-01

    This Post-Closure Inspection and Monitoring report provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 Waste Management Division (WMD) U-3ax/bl Crater. This report includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2004 through June 2005. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and use restriction warning signs was good. Settling was observed thatmore » exceeded the action level as specified in Section VII.B.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (cm) (6 inches [in]) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection.« less

  19. Drive Control System for Pipeline Crawl Robot Based on CAN Bus

    NASA Astrophysics Data System (ADS)

    Chen, H. J.; Gao, B. T.; Zhang, X. H.; Deng2, Z. Q.

    2006-10-01

    Drive control system plays important roles in pipeline robot. In order to inspect the flaw and corrosion of seabed crude oil pipeline, an original mobile pipeline robot with crawler drive unit, power and monitor unit, central control unit, and ultrasonic wave inspection device is developed. The CAN bus connects these different function units and presents a reliable information channel. Considering the limited space, a compact hardware system is designed based on an ARM processor with two CAN controllers. With made-to-order CAN protocol for the crawl robot, an intelligent drive control system is developed. The implementation of the crawl robot demonstrates that the presented drive control scheme can meet the motion control requirements of the underwater pipeline crawl robot.

  20. Environmental monitoring, restoration and assessment: What have we learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, R.H.

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facilitymore » operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.« less

  1. Health State Utilities Associated with Glucose Monitoring Devices.

    PubMed

    Matza, Louis S; Stewart, Katie D; Davies, Evan W; Hellmund, Richard; Polonsky, William H; Kerr, David

    2017-03-01

    Glucose monitoring is important for patients with diabetes treated with insulin. Conventional glucose monitoring requires a blood sample, typically obtained by pricking the finger. A new sensor-based system called "flash glucose monitoring" monitors glucose levels with a sensor worn on the arm, without requiring blood samples. To estimate the utility difference between these two glucose monitoring approaches for use in cost-utility models. In time trade-off interviews, general population participants in the United Kingdom (London and Edinburgh) valued health states that were drafted and refined on the basis of literature, clinician input, and a pilot study. The health states had identical descriptions of diabetes and insulin treatment, differing only in glucose monitoring approach. A total of 209 participants completed the interviews (51.7% women; mean age = 42.1 years). Mean utilities were 0.851 ± 0.140 for conventional monitoring and 0.882 ± 0.121 for flash monitoring (significant difference between the mean utilities; t = 8.3; P < 0.0001). Of the 209 participants, 78 (37.3%) had a higher utility for flash monitoring, 2 (1.0%) had a higher utility for conventional monitoring, and 129 (61.7%) had the same utility for both health states. The flash glucose monitoring system was associated with a significantly greater utility than the conventional monitoring system. This difference may be useful in cost-utility models comparing the value of glucose monitoring devices for patients with diabetes. This study adds to the literature on treatment process utilities, suggesting that time trade-off methods may be used to quantify preferences among medical devices. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  2. Developing Coherent, Concise and Comprehensive User Requirements Using the MoD Architectural Framework (MODAF)

    DTIC Science & Technology

    2005-06-01

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT...Prescribed by ANSI Std Z39-18 2 D CBM(A)/07/10/06 14 March 2005 DEVELOPING USER REQUIREMENTS USING THE MOD ARCHITECHTURAL FRAMEWORK (MODAF

  3. Design and Evaluation of a Fully Implantable Control Unit for Blood Pumps

    PubMed Central

    Unthan, Kristin; Gräf, Felix; Laumen, Marco; Finocchiaro, Thomas; Sommer, Christoph; Lanmüller, Hermann; Steinseifer, Ulrich

    2015-01-01

    As the number of donor hearts is limited while more and more patients suffer from end stage biventricular heart failure, Total Artificial Hearts become a promising alternative to conventional treatment. While pneumatic devices sufficiently supply the patients with blood flow, the patient's quality of life is limited by the percutaneous pressure lines and the size of the external control unit. This paper describes the development of the control unit of the ReinHeart, a fully implantable Total Artificial Heart. General requirements for any implantable control unit are defined from a technical and medical point of view: necessity of a Transcutaneous Energy Transmission, autonomous operation, safety, geometry, and efficiency. Based on the requirements, a prototype is designed; it incorporates a LiFePo4 battery pack with charger, a rectifier for transcutaneous energy transmission, the motor's driver electronics, and a microcontroller which monitors and controls all functions. In validation tests, the control unit demonstrated a stable operation on TET and battery supply and a safe switching from one supply to the other. The overall mean efficiency is 14% on TET and 22% on battery supply. The control unit is suitable for chronic animal trials of the ReinHeart. PMID:26583095

  4. Rapid culture-independent microbial analysis aboard the International Space Station (ISS).

    PubMed

    Maule, Jake; Wainwright, Norm; Steele, Andrew; Monaco, Lisa; Morris, Heather; Gunter, Daniel; Damon, Michael; Wells, Mark

    2009-10-01

    A new culture-independent system for microbial monitoring, called the Lab-On-a-Chip Application Development Portable Test System (LOCAD-PTS), was operated aboard the International Space Station (ISS). LOCAD-PTS was launched to the ISS aboard Space Shuttle STS-116 on December 9, 2006, and has since been used by ISS crews to monitor endotoxin on cabin surfaces. Quantitative analysis was performed within 15 minutes, and sample return to Earth was not required. Endotoxin (a marker of Gram-negative bacteria) was distributed throughout the ISS, despite previous indications that mostbacteria on ISS surfaces were Gram-positive [corrected].Endotoxin was detected at 24 out of 42 surface areas tested and at every surface site where colony-forming units (cfu) were observed, even at levels of 4-120 bacterial cfu per 100 cm(2), which is below NASA in-flight requirements (<10,000 bacterial cfu per 100 cm(2)). Absent to low levels of endotoxin (<0.24 to 1.0 EU per 100 cm(2); defined in endotoxin units, or EU) were found on 31 surface areas, including on most panels in Node 1 and the US Lab. High to moderate levels (1.01 to 14.7 EU per 100 cm(2)) were found on 11 surface areas, including at exercise, hygiene, sleeping, and dining facilities. Endotoxin was absent from airlock surfaces, except the Extravehicular Hatch Handle (>3.78 EU per 100 cm(2)). Based upon data collected from the ISS so far, new culture-independent requirements (defined in EU) are suggested, which are verifiable in flight with LOCAD-PTS yet high enough to avoid false alarms. The suggested requirements are intended to supplement current ISS requirements (defined in cfu) and would serve a dual purpose of safeguarding crew health (internal spacecraft surfaces <20 EU per 100 cm(2)) and monitoring forward contamination during Constellation missions (surfaces periodically exposed to the external environment, including the airlock and space suits, <0.24 EU per 100 cm(2)).

  5. Rapid Culture-Independent Microbial Analysis Aboard the International Space Station (ISS)

    NASA Astrophysics Data System (ADS)

    Maule, Jake; Wainwright, Norm; Steele, Andrew; Monaco, Lisa; Morris, Heather; Gunter, Daniel; Damon, Michael; Wells, Mark

    2009-10-01

    A new culture-independent system for microbial monitoring, called the Lab-On-a-Chip Application Development Portable Test System (LOCAD-PTS), was operated aboard the International Space Station (ISS). LOCAD-PTS was launched to the ISS aboard Space Shuttle STS-116 on December 9, 2006, and has since been used by ISS crews to monitor endotoxin on cabin surfaces. Quantitative analysis was performed within 15 minutes, and sample return to Earth was not required. Endotoxin (a marker of Gram-negative bacteria and fungi) was distributed throughout the ISS, despite previous indications that most bacteria on ISS surfaces were Gram-positive. Endotoxin was detected at 24 out of 42 surface areas tested and at every surface site where colony-forming units (cfu) were observed, even at levels of 4-120 bacterial cfu per 100 cm2, which is below NASA in-flight requirements (<10,000 bacterial cfu per 100 cm2). Absent to low levels of endotoxin (<0.24 to 1.0 EU per 100 cm2; defined in endotoxin units, or EU) were found on 31 surface areas, including on most panels in Node 1 and the US Lab. High to moderate levels (1.01 to 14.7 EU per 100 cm2) were found on 11 surface areas, including at exercise, hygiene, sleeping, and dining facilities. Endotoxin was absent from airlock surfaces, except the Extravehicular Hatch Handle (>3.78 EU per 100 cm2). Based upon data collected from the ISS so far, new culture-independent requirements (defined in EU) are suggested, which are verifiable in flight with LOCAD-PTS yet high enough to avoid false alarms. The suggested requirements are intended to supplement current ISS requirements (defined in cfu) and would serve a dual purpose of safeguarding crew health (internal spacecraft surfaces <20 EU per 100 cm2) and monitoring forward contamination during Constellation missions (surfaces periodically exposed to the external environment, including the airlock and space suits, <0.24 EU per 100 cm2).

  6. Cost and results of information systems for health and poverty indicators in the United Republic of Tanzania.

    PubMed Central

    Rommelmann, Vanessa; Setel, Philip W.; Hemed, Yusuf; Angeles, Gustavo; Mponezya, Hamisi; Whiting, David; Boerma, Ties

    2005-01-01

    OBJECTIVE: To examine the costs of complementary information generation activities in a resource-constrained setting and compare the costs and outputs of information subsystems that generate the statistics on poverty, health and survival required for monitoring, evaluation and reporting on health programmes in the United Republic of Tanzania. METHODS: Nine systems used by four government agencies or ministries were assessed. Costs were calculated from budgets and expenditure data made available by information system managers. System coverage, quality assurance and information production were reviewed using questionnaires and interviews. Information production was characterized in terms of 38 key sociodemographic indicators required for national programme monitoring. FINDINGS: In 2002-03 approximately US$ 0.53 was spent per Tanzanian citizen on the nine information subsystems that generated information on 37 of the 38 selected indicators. The census and reporting system for routine health service statistics had the largest participating populations and highest total costs. Nationally representative household surveys and demographic surveillance systems (which are not based on nationally representative samples) produced more than half the indicators and used the most rigorous quality assurance. Five systems produced fewer than 13 indicators and had comparatively high costs per participant. CONCLUSION: Policy-makers and programme planners should be aware of the many trade-offs with respect to system costs, coverage, production, representativeness and quality control when making investment choices for monitoring and evaluation. In future, formal cost-effectiveness studies of complementary information systems would help guide investments in the monitoring, evaluation and planning needed to demonstrate the impact of poverty-reduction and health programmes. PMID:16184275

  7. 40 CFR Table 7 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... absorbent is used. Condenser Exit temperature Maximum temperature. Carbon adsorber Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle; and temperature of the carbon bed after regeneration (and within 15 minutes of completing any cooling cycle(s)) Maximum mass or volumetric flow; and...

  8. 40 CFR Table 5 to Subpart Ppp of... - Process Vents From Batch Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream mass or volumetric flow during each...

  9. 40 CFR Table 7 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... absorbent is used. Condenser Exit temperature Maximum temperature. Carbon adsorber Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle; and temperature of the carbon bed after regeneration (and within 15 minutes of completing any cooling cycle(s)) Maximum mass or volumetric flow; and...

  10. 40 CFR Table 5 to Subpart Ppp of... - Process Vents From Batch Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream mass or volumetric flow during each...

  11. 40 CFR Table 5 to Subpart Ppp of... - Process Vents From Batch Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream mass or volumetric flow during each...

  12. 40 CFR Table 7 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... absorbent is used. Condenser Exit temperature Maximum temperature. Carbon adsorber Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle; and temperature of the carbon bed after regeneration (and within 15 minutes of completing any cooling cycle(s)) Maximum mass or volumetric flow; and...

  13. 40 CFR 60.2942 - What is the minimum amount of monitoring data I must collect with my continuous emission...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Other Solid Waste Incineration Units for Which Construction is Commenced After December 9... combusts any municipal or institutional solid waste. (d) If you do not obtain the minimum data required in... alternate methods for collecting data when systems malfunction or when repairs, calibration checks, or zero...

  14. 40 CFR 60.2942 - What is the minimum amount of monitoring data I must collect with my continuous emission...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Other Solid Waste Incineration Units for Which Construction is Commenced After December 9... combusts any municipal or institutional solid waste. (d) If you do not obtain the minimum data required in... alternate methods for collecting data when systems malfunction or when repairs, calibration checks, or zero...

  15. 2013 Survey of Iowa groundwater and evaluation of public well vulnerability classifications for contaminants of emerging concern

    USDA-ARS?s Scientific Manuscript database

    Groundwater supplies drinking water to about 80% of Iowa’s 3 million people, with over 2 million of these people obtaining their drinking water from public water supplies (PWS). Such PWS are required by the United States Environmental Protection Agency (US EPA) to monitor finished water for a varie...

  16. 40 CFR 63.1565 - What are my requirements for organic HAP emissions from catalytic cracking units?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... according to the procedures in the plan. (4) The emission limitations and operating limits for organic HAP... work practice standards? You must: (1) Install, operate, and maintain a continuous monitoring system... operating limit in Table 9 of this subpart that applies to you according to the procedures in Table 11 of...

  17. 40 CFR 63.1565 - What are my requirements for organic HAP emissions from catalytic cracking units?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... according to the procedures in the plan. (4) The emission limitations and operating limits for organic HAP... work practice standards? You must: (1) Install, operate, and maintain a continuous monitoring system... operating limit in Table 9 of this subpart that applies to you according to the procedures in Table 11 of...

  18. United States Military Posture for FY 1987

    DTIC Science & Technology

    1987-01-01

    monitor, plan, and execute mobilization, deployment, employment, and sustainment during peace, crisis, and war. JOPES requirements are being developed ...positioning 68 Deployment Management 69 VI Sustainability 69 Ammunition 69 Petroleum, Oils, and Lubricants 69 Military Construction 69...Commanders in Chiefs 73 Joint Doctrine 73 Combined Doctrine 74 Joint Force Development Process 74 Joint Resource Assessment 75 Joint Program

  19. 76 FR 34947 - Fisheries of the Northeastern United States; Atlantic Herring Fishery; Regulatory Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... information is necessary to monitor herring catch against the stock- wide herring annual catch limit (ACL) and... that Amendment 4 would continue to address ACL and AM requirements and specification issues, but that... (Amendment 5). The harvest of herring is managed by a stock-wide ACL that is divided between three management...

  20. 40 CFR Appendix E to Part 63 - Monitoring Procedure for Nonthoroughly Mixed Open Biological Treatment Systems at Kraft Pulp...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems at Kraft Pulp Mills Under Unsafe Sampling Conditions I. Purpose This procedure is required to be... conditions. The purpose of this procedure is to estimate the concentration of HAP within the open biological... zones with internal recycling between the units and assuming that two Monod biological kinetic...

  1. 34 CFR 381.31 - What are the requirements pertaining to the protection, use, and release of personal information?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... interpreted by the courts of the United States, except that, for purposes of any periodic audit, report, or..., notwithstanding paragraph (d)(1) of this section, if an audit, monitoring review, State plan assurance review... personally identifiable information (i.e., name, address, telephone number, social security number, or other...

  2. Shared performance monitor in a multiprocessor system

    DOEpatents

    Chiu, George; Gara, Alan G; Salapura, Valentina

    2014-12-02

    A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU is further programmed to monitor event signals issued from non-processor devices.

  3. Monocular display unit for 3D display with correct depth perception

    NASA Astrophysics Data System (ADS)

    Sakamoto, Kunio; Hosomi, Takashi

    2009-11-01

    A study of virtual-reality system has been popular and its technology has been applied to medical engineering, educational engineering, a CAD/CAM system and so on. The 3D imaging display system has two types in the presentation method; one is a 3-D display system using a special glasses and the other is the monitor system requiring no special glasses. A liquid crystal display (LCD) recently comes into common use. It is possible for this display unit to provide the same size of displaying area as the image screen on the panel. A display system requiring no special glasses is useful for a 3D TV monitor, but this system has demerit such that the size of a monitor restricts the visual field for displaying images. Thus the conventional display can show only one screen, but it is impossible to enlarge the size of a screen, for example twice. To enlarge the display area, the authors have developed an enlarging method of display area using a mirror. Our extension method enables the observers to show the virtual image plane and to enlarge a screen area twice. In the developed display unit, we made use of an image separating technique using polarized glasses, a parallax barrier or a lenticular lens screen for 3D imaging. The mirror can generate the virtual image plane and it enlarges a screen area twice. Meanwhile the 3D display system using special glasses can also display virtual images over a wide area. In this paper, we present a monocular 3D vision system with accommodation mechanism, which is useful function for perceiving depth.

  4. Bedside arterial blood gas monitoring system using fluorescent optical sensors

    NASA Astrophysics Data System (ADS)

    Bartnik, Daniel J.; Rymut, Russell A.

    1995-05-01

    We describe a bedside arterial blood gas (ABG) monitoring system which uses fluorescent optical sensors in the measurement of blood pH, PCO2 and PO2. The Point-of-Care Arterial Blood Gas Monitoring System consists of the SensiCathTM optical sensor unit manufactured by Optical Sensors Incorporated and the TramTM Critical Care Monitoring System with ABG Module manufactured by Marquette Electronics Incorporated. Current blood gas measurement techniques require a blood sample to be removed from the patient and transported to an electrochemical analyzer for analysis. The ABG system does not require removal of blood from the patient or transport of the sample. The sensor is added to the patient's existing arterial line. ABG measurements are made by drawing a small blood sample from the arterial line in sufficient quantity to ensure an undiluted sample at the sensor. Measurements of pH, PCO2 and PO2 are made within 60 seconds. The blood is then returned to the patient, the line flushed and results appear on the bedside monitor. The ABG system offers several advantages over traditional electrochemical analyzers. Since the arterial line remains closed during the blood sampling procedure the patient's risk of infection is reduced and the caregiver's exposure to blood is eliminated. The single-use, disposable sensor can be measure 100 blood samples over 72 hours after a single two-point calibration. Quality Assurance checks are also available and provide the caregiver the ability to assess system performance even after the sensor is patient attached. The ABG module integrates with an existing bedside monitoring system. This allows ABG results to appear on the same display as ECG, respiration, blood pressure, cardiac output, SpO2, and other clinical information. The small module takes up little space in the crowded intensive care unit. Performance studies compare the ABG system with an electrochemical blood gas analyzer. Study results demonstrated accurate and precise blood gas measurement of 100 samples and 72 hour performance without need for re-calibration.

  5. Multiparametric methane sensor for environmental monitoring

    NASA Astrophysics Data System (ADS)

    Borecki, M.; Duk, M.; Kociubiński, A.; Korwin-Pawlowski, M. L.

    2016-12-01

    Today, methane sensors find applications mostly in safety alarm installations, gas parameters detection and air pollution classification. Such sensors and sensors elements exists for industry and home use. Under development area of methane sensors application is dedicated to ground gases monitoring. Proper monitoring of soil gases requires reliable and maintenance-free semi-constant and longtime examination at relatively low cost of equipment. The sensors for soil monitoring have to work on soil probe. Therefore, sensor is exposed to environment conditions, as a wide range of temperatures and a full scale of humidity changes, as well as rain, snow and wind, that are not specified for classical methane sensors. Development of such sensor is presented in this paper. The presented sensor construction consists of five commercial non dispersive infra-red (NDIR) methane sensing units, a set of temperature and humidity sensing units, a gas chamber equipped with a micro-fan, automated gas valves and also a microcontroller that controls the measuring procedure. The electronics part of sensor was installed into customized 3D printed housing equipped with self-developed gas valves. The main development of proposed sensor is on the side of experimental evaluation of construction reliability and results of data processing included safety procedures and function for hardware error correction. Redundant methane sensor units are used providing measurement error correction as well as improved measurement accuracy. The humidity and temperature sensors are used for internal compensation of methane measurements as well as for cutting-off the sensor from the environment when the conditions exceed allowable parameters. Results obtained during environment sensing prove that the gas concentration readings are not sensitive to gas chamber vertical or horizontal position. It is important as vertical sensor installation on soil probe is simpler that horizontal one. Data acquired during six month of environment monitoring prove that error correction of methane sensing units was essential for maintenance free sensor operation, despite used safety procedures.

  6. Consensus statement for use and technical requirements of thyroid ultrasound in endocrinology units.

    PubMed

    Martín-Hernández, Tomás; Díez Gómez, Juan José; Díaz-Soto, Gonzalo; Torres Cuadro, Alberto; Navarro González, Elena; Oleaga Alday, Amelia; Sambo Salas, Marcel; Reverter Calatayud, Jordi L; Argüelles Jiménez, Iñaki; Mancha Doblas, Isabel; Fernández García, Diego; Galofré, Juan Carlos

    2017-03-01

    Thyroid nodule detection has increased with widespread use of ultrasound, which is currently the main tool for detection, monitoring, diagnosis and, in some instances, treatment of thyroid nodules. Knowledge of ultrasound and adequate instruction on its use require a position statement by the scientific societies concerned. The working groups on thyroid cancer and ultrasound techniques of the Spanish Society of Endocrinology and Nutrition have promoted this document, based on a thorough analysis of the current literature, the results of multicenter studies and expert consensus, in order to set the requirements for the best use of ultrasound in clinical practice. The objectives include the adequate framework for use of thyroid ultrasound, the technical and legal requirements, the clinical situations in which it is recommended, the levels of knowledge and learning processes, the associated responsibility, and the establishment of a standardized reporting of results and integration into hospital information systems and endocrinology units. Copyright © 2017 SEEN. Publicado por Elsevier España, S.L.U. All rights reserved.

  7. Microprocessor-based integration of microfluidic control for the implementation of automated sensor monitoring and multithreaded optimization algorithms.

    PubMed

    Ezra, Elishai; Maor, Idan; Bavli, Danny; Shalom, Itai; Levy, Gahl; Prill, Sebastian; Jaeger, Magnus S; Nahmias, Yaakov

    2015-08-01

    Microfluidic applications range from combinatorial synthesis to high throughput screening, with platforms integrating analog perfusion components, digitally controlled micro-valves and a range of sensors that demand a variety of communication protocols. Currently, discrete control units are used to regulate and monitor each component, resulting in scattered control interfaces that limit data integration and synchronization. Here, we present a microprocessor-based control unit, utilizing the MS Gadgeteer open framework that integrates all aspects of microfluidics through a high-current electronic circuit that supports and synchronizes digital and analog signals for perfusion components, pressure elements, and arbitrary sensor communication protocols using a plug-and-play interface. The control unit supports an integrated touch screen and TCP/IP interface that provides local and remote control of flow and data acquisition. To establish the ability of our control unit to integrate and synchronize complex microfluidic circuits we developed an equi-pressure combinatorial mixer. We demonstrate the generation of complex perfusion sequences, allowing the automated sampling, washing, and calibrating of an electrochemical lactate sensor continuously monitoring hepatocyte viability following exposure to the pesticide rotenone. Importantly, integration of an optical sensor allowed us to implement automated optimization protocols that require different computational challenges including: prioritized data structures in a genetic algorithm, distributed computational efforts in multiple-hill climbing searches and real-time realization of probabilistic models in simulated annealing. Our system offers a comprehensive solution for establishing optimization protocols and perfusion sequences in complex microfluidic circuits.

  8. Adoption of Telehealth: Remote Biometric Monitoring Among Peritoneal Dialysis Patients in the United States.

    PubMed

    Lew, Susie Q; Sikka, Neal; Thompson, Clinton; Cherian, Teena; Magnus, Manya

    2017-01-01

    We examined participant uptake and utilization of remote monitoring devices, and the relationship between remote biometric monitoring (RBM) of weight (Wt) and blood pressure (BP) with self-monitoring requirements. Participants on peritoneal dialysis (PD) ( n = 269) participated in a Telehealth pilot study of which 253 used remote monitoring of BP and 255 for Wt. Blood pressure and Wt readings were transmitted in real time to a Telehealth call center, which were then forwarded to the PD nurses for real-time review. Uptake of RBM was substantial, with 89.7% accepting RBM, generating 74,266 BP and 52,880 Wt measurements over the study period. We found no significant correlates of RBM uptake with regard to gender, marital, educational, socio-economic or employment status, or baseline experience with computers; frequency of use of BP RBM by Black participants was less than non-Black participants, as was Wt RBM, and participants over 55 years old were more likely to use the Wt RBM than their younger counterparts. Having any review of the breach by a nurse was associated with reduced odds of a subsequent BP breach after adjusting for sex, age, and race. Remote biometric monitoring was associated with adherence to self-monitoring BP and Wt requirements associated with PD. Remote biometric monitoring was feasible, allowing for increased communication between patient and PD clinical staff with real-time patient data for providers to act on to potentially improve adherence and outcomes. Copyright © 2017 International Society for Peritoneal Dialysis.

  9. Status and prospects for renewable energy using wood pellets from the southeastern United States

    DOE PAGES

    Dale, Virginia H.; Kline, Keith L.; Parish, Esther S.; ...

    2017-04-20

    The ongoing debate about costs and benefits of wood-pellet based bioenergy production in the southeastern United States (SE USA) requires an understanding of the science and context influencing market decisions associated with its sustainability. Production of pellets has garnered much attention as US exports have grown from negligible amounts in the early 2000s to 4.6 million metric tonnes in 2015. Currently, 98% of these pellet exports are shipped to Europe to displace coal in power plants. We ask, 'How is the production of wood pellets in the SE USA affecting forest systems and the ecosystem services they provide?' To addressmore » this question, we review current forest conditions and the status of the wood products industry, how pellet production affects ecosystem services and biodiversity, and what methods are in place to monitor changes and protect vulnerable systems. Scientific studies provide evidence that wood pellets in the SE USA are a fraction of total forestry operations and can be produced while maintaining or improving forest ecosystem services. Ecosystem services are protected by the requirement to utilize loggers trained to apply scientifically based best management practices in planning and implementing harvest for the export market. Bioenergy markets supplement incomes to private rural landholders and provide an incentive for forest management practices that simultaneously benefit water quality and wildlife and reduce risk of fire and insect outbreaks. Bioenergy also increases the value of forest land to landowners, thereby decreasing likelihood of conversion to nonforest uses. Monitoring and evaluation are essential to verify that regulations and good practices are achieving goals and to enable timely responses if problems arise. Conducting rigorous research to understand how conditions change in response to management choices requires baseline data, monitoring, and appropriate reference scenarios. Furthermore, long-term monitoring data on forest conditions should be publicly accessible and utilized to inform adaptive management.« less

  10. Status and prospects for renewable energy using wood pellets from the southeastern United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale, Virginia H.; Kline, Keith L.; Parish, Esther S.

    The ongoing debate about costs and benefits of wood-pellet based bioenergy production in the southeastern United States (SE USA) requires an understanding of the science and context influencing market decisions associated with its sustainability. Production of pellets has garnered much attention as US exports have grown from negligible amounts in the early 2000s to 4.6 million metric tonnes in 2015. Currently, 98% of these pellet exports are shipped to Europe to displace coal in power plants. We ask, 'How is the production of wood pellets in the SE USA affecting forest systems and the ecosystem services they provide?' To addressmore » this question, we review current forest conditions and the status of the wood products industry, how pellet production affects ecosystem services and biodiversity, and what methods are in place to monitor changes and protect vulnerable systems. Scientific studies provide evidence that wood pellets in the SE USA are a fraction of total forestry operations and can be produced while maintaining or improving forest ecosystem services. Ecosystem services are protected by the requirement to utilize loggers trained to apply scientifically based best management practices in planning and implementing harvest for the export market. Bioenergy markets supplement incomes to private rural landholders and provide an incentive for forest management practices that simultaneously benefit water quality and wildlife and reduce risk of fire and insect outbreaks. Bioenergy also increases the value of forest land to landowners, thereby decreasing likelihood of conversion to nonforest uses. Monitoring and evaluation are essential to verify that regulations and good practices are achieving goals and to enable timely responses if problems arise. Conducting rigorous research to understand how conditions change in response to management choices requires baseline data, monitoring, and appropriate reference scenarios. Furthermore, long-term monitoring data on forest conditions should be publicly accessible and utilized to inform adaptive management.« less

  11. Continued Development of Compact Multi-gas Monitor for Life Support Systems Control in Space

    NASA Technical Reports Server (NTRS)

    Delgado-Alonso, Jesús; Phillips, Straun; Chullen, Cinda; Quinn, Gregory

    2016-01-01

    Miniature optic gas sensors (MOGS) based on luminescent materials have shown great potential as alternatives to Near-Infrared-based gas sensor systems for the advanced space suit portable life support system (PLSS). The unique capability of MOGS for carbon dioxide and oxygen monitoring under wet conditions has been reported, as has the fast recovery of MOGS humidity sensors after long periods of being wet. Lower volume and power requirements are also potential advantages of MOGS over both traditional and advanced Non-Dispersive Infrared (NDIR) gas sensors, which have shown so far longer life than luminescent sensors. This paper presents the most recent results in the development and analytical validation of a compact multi-gas sensor unit based on luminescent sensors for the PLSS. Results of extensive testing are presented, including studies conducted at Intelligent Optical Systems laboratories, a United Technology Corporation Aerospace Systems (UTAS) laboratory, and a Johnson Space Center laboratory. The potential of this sensor technology for gas monitoring in PLSSs and other life support systems and the advantages and limitations found through detailed sensor validation are discussed.

  12. Continued Development of Compact Multi-Gas Monitor for Life Support Systems Control in Space

    NASA Technical Reports Server (NTRS)

    Delgado, Jesus; Phillips, Straun; Chullen, Cinda

    2015-01-01

    Miniature optic gas sensors (MOGS) based on luminescent materials have shown great potential as alternatives to NIR-based gas sensor systems for the Portable Life Support System (PLSS). The unique capability of MOGS for carbon dioxide and oxygen monitoring under wet conditions has been reported, as has the fast recovery of MOGS humidity sensors after long periods of being wet. Lower volume and power requirements are also potential advantages of MOGS over both traditional and advanced Non-Dispersive Infrared (NDIR) gas sensors, which have shown so far longer life than luminescent sensors. In this paper we present the most recent results in the development and analytical validation of a compact multi-gas sensor unit based on luminescent sensors for the PLSS. Results of extensive testing are presented, including studies conducted at Intelligent Optical Systems laboratories, a United Technology Corporation Aerospace Systems (UTAS) laboratory, and a Johnson Space Center laboratory. The potential of this sensor technology for gas monitoring in PLSSs and other life support systems and the advantages and limitations found through detailed sensor validation are discussed.

  13. Continued Development of Compact Multi-Gas Monitor for Life Support Systems Control in Space

    NASA Technical Reports Server (NTRS)

    Delgado-Alonso, Jesus; Phillips, Straun; Berry, David; DiCarmine, Paul; Chullen, Cinda; Quinn, Gregory

    2016-01-01

    Miniature optical gas sensors based on luminescent materials have shown great potential as alternatives to NIR-based gas sensor systems for the Portable Life Support System (PLSS). The unique capability of luminescent sensors for carbon dioxide and oxygen monitoring under wet conditions has been reported, as has the fast recovery of humidity sensors after long periods of being wet. Lower volume and power requirements are also potential advantages over both traditional and advanced non-dispersive infrared (NDIR) gas sensors, which have so far shown longer life than luminescent sensors. In this paper we present the most recent results in the development and analytical validation of a compact multi-gas sensor unit based on luminescent sensors for the PLSS. Results of extensive testing are presented, including studies conducted in Intelligent Optical Systems laboratories, a United Technologies Corporation Aerospace Systems (UTC) laboratory, and a Johnson Space Center laboratory. The potential of this sensor technology for gas monitoring in PLSSs and other life support systems, and the advantages and limitations found through detailed sensor validation are discussed.

  14. Transport and fate of gaseous pollutants associated with the National Energy Program.

    PubMed Central

    Altshuller, A P; Johnson, W B; Nader, J S; Niemann, B L; Turner, D B; Wilson, W E; D'Alessio, G

    1980-01-01

    The experimental evidence related to the long-range transport and transformations of sulfates has been critically reviewed. It has been concluded that sulfate emissions from various sources can be superimposed on each other during long-range transport to create episodes far from the contributing sources. Sulfates are important contributors to degrading visibility through the United States including relatively pristine areas in the western United States. Acid sulfate components, along with nitric acid, may increase the problem of acidity in precipitation on soils, vegetation, and lakes in certain areas of the eastern United States. Improvements in monitoring of these pollutants are required to follow changes in air quality caused by long-range transport. PMID:7428742

  15. Occupational lead poisoning: can it be eliminated?

    PubMed

    Kaufman, J D; Burt, J; Silverstein, B

    1994-11-01

    The continued occurrence of occupational lead poisoning and overexposure in the United States represents a serious challenge to the occupational health community. We outline a proposed action strategy which integrates case-based surveillance, hazard surveillance, increased requirements for biological monitoring, and targeted educational activities, with a goal of eliminating occupational lead poisoning. The system provides a simple mechanism for monitoring compliance in lead-using employers, in order to identify employers for enforcement action. Lead poisoning should be viewed as an eradicable condition; successfully solving the persistent lead overexposure problem can serve as a model for approaching other occupational diseases.

  16. Working group on the “adequate minimum” V=volcanic observatory

    USGS Publications Warehouse

    Tilling, R.I.

    1982-01-01

    A working group consisting of R. I. Tilling (United States, Chairman), M. Espendola (Mexico), E. Malavassi (Costa Rica), L. Villari (Italy), and J.P Viode (France) met on the island of Guadeloupe on February 20, 1981, to discuss informally the requirements for a "Minimum" volcano observatory, one which would have the essential monitoring equipment and staff to provide reliable information on the state of an active volcno. Given the premise that any monitoring of a volcano is better than none at all, the owrking group then proceeded to consider the concept of an "adequate minimum" observatory. 

  17. An approach for using AVHRR data to monitor U.S. great plains grasslands

    USGS Publications Warehouse

    Reed, B.C.; Loveland, Thomas R.; Tieszen, L.L.

    1996-01-01

    Environmental monitoring requires regular observations regarding the status of the landscape- The concept behind most monitoring efforts using satellite data involve deriving normalized difference vegetation index (NDVI) values or accumulating the NDVI over a specified time period. These efforts attempt to estimate the continuous growth of green biomass by using continuous additions of NDVI as a surrogate measure. To build upon this concept, this study proposes three refinements; 1) use an objective definition of the current growing season to adjust the time window during which the NDVI is accumulated, 2) accumulate only the NDVI values which are affected by green vegetation, and 3) base monitoring units upon land cover type. These refinements improve the sensitivity of detecting interannual vegetation variability, reduce the need for extensive and detailed knowledge of ground conditions and crop calendars, provide a framework in which several types of monitoring can take place over diverse land cover types, and provide an objective time frame during which monitoring takes place.

  18. Nursing home resident smoking policies.

    PubMed

    Stefanacci, Richard G; Lester, Paula E; Kohen, Izchak

    2008-01-01

    To identify nursing home standards related to resident smoking through a nation wide survey of directors of nursing. A national survey was distributed online and was completed by 248 directors of nursing. The directors of nurses answered questions concerning resident smoking including the criteria utilized to determine an unsafe resident smoker. For those residents identified as unsafe, the questions asked were specifically related to monitoring, staff involvement, safety precautions and policy. The results of the survey demonstrated a consistent policy practiced among facilities across the United States. The monitoring of nursing home residents is based on a resident's mental acuity, physical restrictions and equipment requirements. Once a resident was identified as a smoker at risk of harm to self or others, staff involvement ranged from distributing cigarettes to direct supervision. In addition, the majority of facilities required residents to wear fire resistant aprons and provided a fire extinguisher in smoking areas. Monitoring policies of nursing home residents who smoke starts with identifying those residents at risk based on an assessment of mental acuity, physical restrictions and equipment requirements. Those that are identified as being at risk smokers have their cigarettes controlled and distributed by nursing staff and are supervised by facility staff when smoking. This policy is implemented through written policy as well as staff education. Despite some discrepancies in the actual implementation of policies to supervise residents who smoke, the policies for assessment for at-risk smokers requiring monitoring is consistent on a national basis.

  19. Seafloor Geodetic Monitoring of the Central Andean Subduction Zone: The Geosea Array

    NASA Astrophysics Data System (ADS)

    Kopp, H.; Lange, D.; Contreras Reyes, E.; Behrmann, J. H.; McGuire, J. J.; Flueh, E. R.

    2014-12-01

    Seafloor geodesy has been identified as one of the central tools in marine geosciences to monitor seafloor deformation at high resolution. To quantify strain accumulation and assess the resultant hazard potential we urgently need systems to resolve seafloor crustal deformation. The GeoSEA (Geodetic Earthquake Observatory on the Seafloor) array consists of a seafloor transponder network comprising a total of 35 units and a wave glider acting as a surface unit (GeoSURF) to ensure satellite correspondence, data transfer and monitor system health. For horizontal direct path measurements, the system utilizes acoustic ranging techniques with a ranging precision better than 15 mm and long term stability over 2 km distance. Vertical motion is obtained from pressure gauges. Integrated inclinometers monitor station settlement in two horizontal directions. Travel time between instruments and the local water sound velocity will be recorded autonomously subsea without system or human intervention for up to 3.5 years. Data from the autonomous network on the seafloor can be retrieved via the integrated high-speed acoustic telemetry link without recovering the seafloor units. In late 2015 GeoSEA will be installed on the Iquique segment of the South America - Nazca convergent plate boundary to monitor crustal deformation. The Iquique seismic gap experienced the 2014 Mw 8.1 Pisagua earthquake, which apparently occurred within a local locking minimum. It is thus crucial to better resolve resolve strain in the forearc between the mainland and the trench in order to improve our understanding of forearc deformation required for hazard assessment. Mobile autonomous seafloor arrays for continuous measurement of active seafloor deformation in hazard zones have the potential to lead to transformative discoveries of plate boundary/fault zone tectonic processes and address a novel element of marine geophysical research.

  20. Fresenius AS.TEC204 blood cell separator.

    PubMed

    Sugai, Mikiya

    2003-02-01

    Fresenius AS.TEC204 is a third-generation blood cell separator that incorporates the continuous centrifugal separation method and automatic control of the cell separation process. Continuous centrifugation separates cell components according to their specific gravity, and different cell components are either harvested or eliminated as needed. The interface between the red blood cell and plasma is optically detected, and the Interface Control (IFC) cooperates with different pumps, monitors and detectors to harvest required components automatically. The system is composed of three major sections; the Front Panel Unit; the Pump Unit, and the Centrifuge Unit. This unit can be used for a wide variety of clinical applications including collection of platelets, peripheral blood stem cells, bone marrow stem cells, granulocytes, mononuclear cells, and exchange of plasma or red cells, and for plasma treatment.

  1. Multistate comparison of attractants and the impact of fruit development stage on trapping Drosophila suzukii (Diptera: Drosophilidae) in raspberry and blueberry

    USDA-ARS?s Scientific Manuscript database

    Spotted wing drosophila, Drosophila suzukii, is an invasive pest of maturing and ripe soft-skinned fruits in the United States. D. suzukii monitoring is a necessary component of an effective integrated pest management program, but require a lure that is highly attractive and as specific to D. suzuki...

  2. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... openings for leaks Initially Semi-annually Visual. 63.133(c) Inspect floating roof in accordance with §§ 63.... Surface impoundments: 63.134(b)(1) Inspect cover and all openings for leaks Initially Semi-annually Visual... for leaks Initially Semi-annually Visual. 63.135(d)(1) Inspect enclosure and all openings for leaks...

  3. 40 CFR Table 5 to Subpart Ppp of... - Process Vents From Batch Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... collected—PR. d,e Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream mass or volumetric flow during each...

  4. 40 CFR Table 6 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operating—PR. d e Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream mass or volumetric flow during each...

  5. 40 CFR Table 6 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... temperature established in the NCS or operating—PR. d,e Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream...

  6. 40 CFR Table 6 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... temperature established in the NCS or operating—PR. d,e Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream...

  7. 40 CFR Table 5 to Subpart Ppp of... - Process Vents From Batch Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... collected—PR. d e Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream mass or volumetric flow during each...

  8. 40 CFR Table 6 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... temperature established in the NCS or operating—PR. d,e Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream...

  9. 40 CFR Table 6 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operating—PR. d,e Carbon Adsorber f Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle(s), and 1. Record of total regeneration stream mass or volumetric flow for each carbon bed regeneration cycle.2. Record and report the total regeneration stream mass or volumetric flow during each...

  10. Statistical strategies for global monitoring of tropical forests

    Treesearch

    Raymond L. Czaplewski

    1991-01-01

    The Food and Agricultural Organization (FAO) of the United Nations is conducting a global assessment of tropical forest resources, which will be accomplished by mid-1992. This assessment requires, in part, estimates of the total area of tropical forest cover in 1990, and the rate of change in forest cover between 1980 and 1990. This paper describes: (1) the strategic...

  11. Strategies for global monitoring of tropical forests

    Treesearch

    Raymond L. Czaplewski

    1994-01-01

    The Food and Agricultural Organization (FAO) of the United Nations is conducting a global assessment of tropical forest resources, which will be accomplished by mid-1992. This assessment requires, in part, estimates of the total area of tropical forest cover in 1990 and the rate of change in forest cover between 1980 and 1990. The following are described here: (1) the...

  12. Application of an In-Line Contamination Monitoring Unit to the AHT-64 Hydraulic Test Stand.

    DTIC Science & Technology

    1981-06-04

    suction return connection port will require the operator to secuire same from a squatting position. The present stowage arrangement on the test stand... SPC FC sample~~~ Iepal" -a *Tpoa _______Rate 7 eo3,t Sq,’ TPc owe te - U Enciosure ULeeds & Northrup N’AFC- 92- 1 0 Typical Plumbing Connections for

  13. A novel drug management system in the Febuxostat versus Allopurinol Streamlined Trial: A description of a pharmacy system designed to supply medications directly to patients within a prospective multicenter randomised clinical trial.

    PubMed

    Rogers, Amy; Flynn, Robert Wv; McDonnell, Patrick; Mackenzie, Isla S; MacDonald, Thomas M

    2016-12-01

    Trials of investigational medicinal products are required to adhere to strict guidelines with regard to the handling and supply of medication. Information technology offers opportunities to approach clinical trial methodology in new ways. This report summarises a novel pharmacy system designed to supply trial medications directly to patients by post in the Febuxostat versus Allopurinol Streamlined Trial. A bespoke web-based software package was designed to facilitate the direct supply of trial medications to Febuxostat versus Allopurinol Streamlined Trial participants from a pharmacy based in the Medicines Monitoring Unit, University of Dundee. To date, 65,467 packs of medication have been dispensed using the system to 3978 patients. Up to 238 packs per day have been dispensed. The Medicines Monitoring Unit Febuxostat versus Allopurinol Streamlined Trial drug management system is an effective method of administering the complex drug supply requirements of a large-scale clinical trial with advantages over existing arrangements. A low rate of loss to follow-up in the Febuxostat versus Allopurinol Streamlined Trial may be attributable to the drug management system. © The Author(s) 2016.

  14. Rapid deployable global sensing hazard alert system

    DOEpatents

    Cordaro, Joseph V; Tibrea, Steven L; Shull, Davis J; Coleman, Jerry T; Shuler, James M

    2015-04-28

    A rapid deployable global sensing hazard alert system and associated methods of operation are provided. An exemplary system includes a central command, a wireless backhaul network, and a remote monitoring unit. The remote monitoring unit can include a positioning system configured to determine a position of the remote monitoring unit based on one or more signals received from one or more satellites located in Low Earth Orbit. The wireless backhaul network can provide bidirectional communication capability independent of cellular telecommunication networks and the Internet. An exemplary method includes instructing at least one of a plurality of remote monitoring units to provide an alert based at least in part on a location of a hazard and a plurality of positions respectively associated with the plurality of remote monitoring units.

  15. A quality monitoring program for red blood cell components: in vitro quality indicators before and after implementation of semiautomated processing.

    PubMed

    Acker, Jason P; Hansen, Adele L; Kurach, Jayme D R; Turner, Tracey R; Croteau, Ioana; Jenkins, Craig

    2014-10-01

    Canadian Blood Services has been conducting quality monitoring of red blood cell (RBC) components since 2005, a period spanning the implementation of semiautomated component production. The aim was to compare the quality of RBC components produced before and after this production method change. Data from 572 RBC units were analyzed, categorized by production method: Method 1, RBC units produced by manual production methods; Method 2, RBC units produced by semiautomated production and the buffy coat method; and Method 3, RBC units produced by semiautomated production and the whole blood filtration method. RBC units were assessed using an extensive panel of in vitro tests, encompassing regulated quality control criteria such as hematocrit (Hct), hemolysis, and hemoglobin (Hb) levels, as well as adenosine triphosphate, 2,3-diphosphoglycerate, extracellular K(+) and Na(+) levels, methemoglobin, p50, RBC indices, and morphology. Throughout the study, all RBC units met mandated Canadian Standards Association guidelines for Hb and Hct, and most (>99%) met hemolysis requirements. However, there were significant differences among RBC units produced using different methods. Hb content was significantly lower in RBC units produced by Method 2 (51.5 ± 5.6 g/unit; p < 0.001). At expiry, hemolysis was lowest in Method 2-produced RBC units (p < 0.05) and extracellular K(+) levels were lowest in units produced by Method 1 (p < 0.001). While overall quality was similar before and after the production method change, the observed differences, although small, indicate a lack of equivalency across RBC products manufactured by different methods. © 2014 AABB.

  16. Shared performance monitor in a multiprocessor system

    DOEpatents

    Chiu, George; Gara, Alan G.; Salapura, Valentina

    2012-07-24

    A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU comprises: a plurality of performance counters each for counting signals representing occurrences of events from one or more the plurality of processor units in the multiprocessor system; and, a plurality of input devices for receiving the event signals from one or more processor devices of the plurality of processor units, the plurality of input devices programmable to select event signals for receipt by one or more of the plurality of performance counters for counting, wherein the PMU is shared between multiple processing units, or within a group of processors in the multiprocessing system. The PMU is further programmed to monitor event signals issued from non-processor devices.

  17. Nurses' Perceptions and Practices Toward Clinical Alarms in a Transplant Cardiac Intensive Care Unit: Exploring Key Issues Leading to Alarm Fatigue

    PubMed Central

    Tarriela, Albert Fajardo; Gomez, Tiffany Michelle; Reed, Charles Calhoun; Rapp, Kami Marie

    2015-01-01

    Background Intensive care units (ICUs) are complex work environments where false alarms occur more frequently than on non-critical care units. The Joint Commission National Patient Safety Goal .06.01.01 targeted improving the safety of clinical alarm systems and required health care facilities to establish alarm systems safety as a hospital priority by July 2014. An important initial step toward this requirement is identifying ICU nurses’ perceptions and common clinical practices toward clinical alarms, where little information is available. Objective Our aim was to determine perceptions and practices of transplant/cardiac ICU (TCICU) nurses toward clinical alarms and benchmark the results against the 2011 Healthcare Technology Foundation’s (HTF) Clinical Alarms Committee Survey. Methods A quality improvement project was conducted on a 20-bed TCICU with 39 full- and part-time nurses. Nurses were surveyed about their perceptions and attitudes toward and practices on clinical alarms using an adapted HTF clinical alarms survey. Results were compared to the 2011 HTF data. Correlations among variables were examined. Results All TCICU nurses provided usable responses (N=39, 100%). Almost all nurses (95%-98%) believed that false alarms are frequent, disrupt care, and reduce trust in alarm systems, causing nurses to inappropriately disable them. Unlike the 2011 HTF clinical alarms survey results, a significantly higher percentage of our TCICU nurses believed that existing devices are complex, questioned the ability and adequacy of the new monitoring systems to solve alarm management issues, pointed to the lack of prompt response to alarms, and indicated the lack of clinical policy on alarm management (P<.01). Major themes in the narrative data focused on nurses’ frustration related to the excessive number of alarms and poor usability of the cardiac monitors. A lack of standardized approaches exists in changing patients’ electrodes and individualizing parameters. Around 60% of nurses indicated they received insufficient training on bedside and central cardiac monitors. A correlation also showed the need for training on cardiac monitors, specifically for older nurses (P=.01). Conclusions False and non-actionable alarms continue to desensitize TCICU nurses, perhaps resulting in missing fatal alarms. Nurses’ attitudes and practices related to clinical alarms are key elements for designing contextually sensitive quality initiatives to fight alarm fatigue. Alarm management in ICUs is a multidimensional complex process involving usability of monitoring devices, and unit, clinicians, training, and policy-related factors. This indicates the need for a multi-method approach to decrease alarm fatigue and improve alarm systems safety. PMID:27025940

  18. Bee guide to complying with the Safe Drinking Water Act. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garland, J.G.; Acker, A.M.

    This report provides current information on the Safe Drinking Water Act and recent amendments. The report describes the evolution of the Safe Drinking Water Act and the responsibilities of base personnel involved in compliance with the Act. It also describes the monitoring requirements, analytical requirements, best available technology for controlling contaminants, and public notification requirements for regulated contaminants. The appendixes include proposed contaminants and state water quality agencies. Each Air Force public water distribution system (PWDS) must comply with the SDWA, and the National Primary Drinking Water Regulations (NPDWRs). In the United States and its territories, the provisions of themore » SDWA and the NPDWRs are enforced by the states except in the few instances in which the state has not been delegated primary enforcement responsibility (primacy) by the EPA. States that have primacy may establish drinking water regulations, monitoring schedules, and reporting requirements more stringent than, or in addition to, those in the NPDWRs. Air Force public water systems in these states are required to comply with these additional requirements as well as federal enforcement actions as carried out by the EPA Regional Office.« less

  19. Multileaf collimator-based linear accelerator radiosurgery: five-year efficiency analysis.

    PubMed

    Lawson, Joshua D; Fox, Tim; Waller, Anthony F; Davis, Lawrence; Crocker, Ian

    2009-03-01

    In 1989, Emory University initiated a linear accelerator (linac) radiosurgery program using circular collimators. In 2001, the program converted to a multileaf collimator. Since then, the treatment parameters of each patient have been stored in the record-and-verify system. Three major changes have occurred in the radiosurgery program in the past 6 years: in 2002, treatment was changed from static conformal beams to dynamic conformal arc (DCA) therapy, and all patients were imaged before treatment. Beginning in 2005, a linac was used, with the opportunity to treat at higher dose rates (600-1,000 monitor units/min). The aim of this study was to analyze the time required to deliver radiosurgery and the factors affecting treatment delivery. Benchmark data are provided for centers contemplating initiating linac radiosurgery programs. Custom software was developed to mine the record-and-verify system database and automatically perform a chart review on patients who underwent stereotactic radiosurgery from March 2001 to October 2006. The software extracted 510 patients who underwent stereotactic radiosurgery, and the following information was recorded for each patient: treatment technique, treatment time (from initiation of imaging, if done, to completion of therapy), number of isocenters, number of fields, total monitor units, and dose rate. Of the 510 patients, 395 were treated with DCA therapy and 115 with static conformal beams. The average number of isocenters treated was 1.06 (range, 1-4). The average times to deliver treatment were 24.1 minutes for patients who underwent DCA therapy and 19.3 minutes for those treated with static conformal beams, reflecting the lack of imaging in the latter patients. Eighty percent of patients were treated in <30 minutes. For the patients who underwent DCA therapy, the times required to treat 1, 2, 3, and 4 isocenters were 23.9, 24.8, 33.1, and 37.8 minutes, respectively. Average beam-on time for these patients was 11.4 minutes. There has been no significant reduction in treatment delivery with the use of 1,000 monitor units/min, reflecting the fact that beam-on time is not the major determinant of overall treatment time. Multileaf collimator-based linac radiosurgery can be delivered efficiently in <30 minutes in the vast majority of patients. Given the limited treatment room utilization required for stereotactic radiosurgery treatments, this study calls into question the need for a dedicated radiosurgery unit for even busy treatment centers.

  20. HIFU Monitoring and Control with Dual-Mode Ultrasound Arrays

    NASA Astrophysics Data System (ADS)

    Casper, Andrew Jacob

    The biological effects of high-intensity focused ultrasound (HIFU) have been known and studied for decades. HIFU has been shown capable of treating a wide variety of diseases and disorders. However, despite its demonstrated potential, HIFU has been slow to gain clinical acceptance. This is due, in part, to the difficulty associated with robustly monitoring and controlling the delivery of the HIFU energy. The non-invasive nature of the surgery makes the assessment of treatment progression difficult, leading to long treatment times and a significant risk of under treatment. This thesis research develops new techniques and systems for robustly monitoring HIFU therapies for the safe and efficacious delivery of the intended treatment. Systems and algorithms were developed for the two most common modes of HIFU delivery systems: single-element and phased array applicators. Delivering HIFU with a single element transducer is a widely used technique in HIFU therapies. The simplicity of a single element offers many benefits in terms of cost and overall system complexity. Typical monitoring schemes rely on an external device (e.g. diagnostic ultrasound or MRI) to assess the progression of therapy. The research presented in this thesis explores using the same element to both deliver and monitor the HIFU therapy. The use of a dual-mode ultrasound transducer (DMUT) required the development of an FPGA based single-channel arbitrary waveform generator and high-speed data acquisition unit. Data collected from initial uncontrolled ablations led to the development of monitoring and control algorithms which were implemented directly on the FPGA. Close integration between the data acquisition and arbitrary waveform units allowed for fast, low latency control over the ablation process. Results are presented that demonstrate control of HIFU therapies over a broad range of intensities and in multiple in vitro tissues. The second area of investigation expands the DMUT research to an ultrasound phased-array. The phased-array allows for electronic steering of the HIFU focus and imaging of the acoustic medium. Investigating the dual-mode ultrasound array (DMUA) required the design and construction of a novel ultrasound-guided focused ultrasound (USgFUS) platform. The platform consisted of custom hardware designed for the unique requirements of operating a phased-array in both therapeutic and imaging modes. The platform also required the development of FPGA based signal processing and GPU based beamforming algorithms for online monitoring of the therapy process. The results presented in this thesis represent the first demonstration of a real-time USgFUS platform based around a DMUA. Experimental imaging and therapy results from series of animal experiments, including a 12 animal GLP study, are presented. In addition, in vitro control results, which build upon the DMUT work, are presented.

  1. IEEE 802.15.4 Frame Aggregation Enhancement to Provide High Performance in Life-Critical Patient Monitoring Systems

    PubMed Central

    Akbar, Muhammad Sajjad; Yu, Hongnian; Cang, Shuang

    2017-01-01

    In wireless body area sensor networks (WBASNs), Quality of Service (QoS) provision for patient monitoring systems in terms of time-critical deadlines, high throughput and energy efficiency is a challenging task. The periodic data from these systems generates a large number of small packets in a short time period which needs an efficient channel access mechanism. The IEEE 802.15.4 standard is recommended for low power devices and widely used for many wireless sensor networks applications. It provides a hybrid channel access mechanism at the Media Access Control (MAC) layer which plays a key role in overall successful transmission in WBASNs. There are many WBASN’s MAC protocols that use this hybrid channel access mechanism in variety of sensor applications. However, these protocols are less efficient for patient monitoring systems where life critical data requires limited delay, high throughput and energy efficient communication simultaneously. To address these issues, this paper proposes a frame aggregation scheme by using the aggregated-MAC protocol data unit (A-MPDU) which works with the IEEE 802.15.4 MAC layer. To implement the scheme accurately, we develop a traffic patterns analysis mechanism to understand the requirements of the sensor nodes in patient monitoring systems, then model the channel access to find the performance gap on the basis of obtained requirements, finally propose the design based on the needs of patient monitoring systems. The mechanism is initially verified using numerical modelling and then simulation is conducted using NS2.29, Castalia 3.2 and OMNeT++. The proposed scheme provides the optimal performance considering the required QoS. PMID:28134853

  2. IEEE 802.15.4 Frame Aggregation Enhancement to Provide High Performance in Life-Critical Patient Monitoring Systems.

    PubMed

    Akbar, Muhammad Sajjad; Yu, Hongnian; Cang, Shuang

    2017-01-28

    In wireless body area sensor networks (WBASNs), Quality of Service (QoS) provision for patient monitoring systems in terms of time-critical deadlines, high throughput and energy efficiency is a challenging task. The periodic data from these systems generates a large number of small packets in a short time period which needs an efficient channel access mechanism. The IEEE 802.15.4 standard is recommended for low power devices and widely used for many wireless sensor networks applications. It provides a hybrid channel access mechanism at the Media Access Control (MAC) layer which plays a key role in overall successful transmission in WBASNs. There are many WBASN's MAC protocols that use this hybrid channel access mechanism in variety of sensor applications. However, these protocols are less efficient for patient monitoring systems where life critical data requires limited delay, high throughput and energy efficient communication simultaneously. To address these issues, this paper proposes a frame aggregation scheme by using the aggregated-MAC protocol data unit (A-MPDU) which works with the IEEE 802.15.4 MAC layer. To implement the scheme accurately, we develop a traffic patterns analysis mechanism to understand the requirements of the sensor nodes in patient monitoring systems, then model the channel access to find the performance gap on the basis of obtained requirements, finally propose the design based on the needs of patient monitoring systems. The mechanism is initially verified using numerical modelling and then simulation is conducted using NS2.29, Castalia 3.2 and OMNeT++. The proposed scheme provides the optimal performance considering the required QoS.

  3. Unobtrusive Software and System Health Management with R2U2 on a Parallel MIMD Coprocessor

    NASA Technical Reports Server (NTRS)

    Schumann, Johann; Moosbrugger, Patrick

    2017-01-01

    Dynamic monitoring of software and system health of a complex cyber-physical system requires observers that continuously monitor variables of the embedded software in order to detect anomalies and reason about root causes. There exists a variety of techniques for code instrumentation, but instrumentation might change runtime behavior and could require costly software re-certification. In this paper, we present R2U2E, a novel realization of our real-time, Realizable, Responsive, and Unobtrusive Unit (R2U2). The R2U2E observers are executed in parallel on a dedicated 16-core EPIPHANY co-processor, thereby avoiding additional computational overhead to the system under observation. A DMA-based shared memory access architecture allows R2U2E to operate without any code instrumentation or program interference.

  4. 48 CFR 252.204-7011 - Alternative Line Item Structure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Unit Unit price Amount 0001 Computer, Desktop with CPU, Monitor, Keyboard and Mouse 20 EA Alternative... Unit Unit Price Amount 0001 Computer, Desktop with CPU, Keyboard and Mouse 20 EA 0002 Monitor 20 EA...

  5. 48 CFR 252.204-7011 - Alternative Line Item Structure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Unit Unit price Amount 0001 Computer, Desktop with CPU, Monitor, Keyboard and Mouse 20 EA Alternative... Unit Unit Price Amount 0001 Computer, Desktop with CPU, Keyboard and Mouse 20 EA 0002 Monitor 20 EA...

  6. 48 CFR 252.204-7011 - Alternative Line Item Structure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Unit Unit price Amount 0001 Computer, Desktop with CPU, Monitor, Keyboard and Mouse 20 EA Alternative... Unit Unit Price Amount 0001 Computer, Desktop with CPU, Keyboard and Mouse 20 EA 0002 Monitor 20 EA...

  7. 48 CFR 252.204-7011 - Alternative Line Item Structure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Unit Unit price Amount 0001 Computer, Desktop with CPU, Monitor, Keyboard and Mouse 20 EA Alternative... Unit Unit Price Amount 0001 Computer, Desktop with CPU, Keyboard and Mouse 20 EA 0002 Monitor 20 EA...

  8. Improving medical device regulation: the United States and Europe in perspective.

    PubMed

    Sorenson, Corinna; Drummond, Michael

    2014-03-01

    Recent debates and events have brought into question the effectiveness of existing regulatory frameworks for medical devices in the United States and Europe to ensure their performance, safety, and quality. This article provides a comparative analysis of medical device regulation in the two jurisdictions, explores current reforms to improve the existing systems, and discusses additional actions that should be considered to fully meet this aim. Medical device regulation must be improved to safeguard public health and ensure that high-quality and effective technologies reach patients. We explored and analyzed medical device regulatory systems in the United States and Europe in accordance with the available gray and peer-reviewed literature and legislative documents. The two regulatory systems differ in their mandate and orientation, organization, pre- and postmarket evidence requirements, and transparency of process. Despite these differences, both jurisdictions face similar challenges for ensuring that only safe and effective devices reach the market, monitoring real-world use, and exchanging pertinent information on devices with key users such as clinicians and patients. To address these issues, reforms have recently been introduced or debated in the United States and Europe that are principally focused on strengthening regulatory processes, enhancing postmarket regulation through more robust surveillance systems, and improving the traceability and monitoring of devices. Some changes in premarket requirements for devices are being considered. Although the current reforms address some of the outstanding challenges in device regulation, additional steps are needed to improve existing policy. We examine a number of actions to be considered, such as requiring high-quality evidence of benefit for medium- and high-risk devices; moving toward greater centralization and coordination of regulatory approval in Europe; creating links between device identifier systems and existing data collection tools, such as electronic health records; and fostering increased and more effective use of registries to ensure safe postmarket use of new and existing devices. © 2014 Milbank Memorial Fund.

  9. Improving Medical Device Regulation: The United States and Europe in Perspective

    PubMed Central

    SORENSON, CORINNA; DRUMMOND, MICHAEL

    2014-01-01

    Context: Recent debates and events have brought into question the effectiveness of existing regulatory frameworks for medical devices in the United States and Europe to ensure their performance, safety, and quality. This article provides a comparative analysis of medical device regulation in the two jurisdictions, explores current reforms to improve the existing systems, and discusses additional actions that should be considered to fully meet this aim. Medical device regulation must be improved to safeguard public health and ensure that high-quality and effective technologies reach patients. Methods: We explored and analyzed medical device regulatory systems in the United States and Europe in accordance with the available gray and peer-reviewed literature and legislative documents. Findings: The two regulatory systems differ in their mandate and orientation, organization, pre-and postmarket evidence requirements, and transparency of process. Despite these differences, both jurisdictions face similar challenges for ensuring that only safe and effective devices reach the market, monitoring real-world use, and exchanging pertinent information on devices with key users such as clinicians and patients. To address these issues, reforms have recently been introduced or debated in the United States and Europe that are principally focused on strengthening regulatory processes, enhancing postmarket regulation through more robust surveillance systems, and improving the traceability and monitoring of devices. Some changes in premarket requirements for devices are being considered. Conclusions: Although the current reforms address some of the outstanding challenges in device regulation, additional steps are needed to improve existing policy. We examine a number of actions to be considered, such as requiring high-quality evidence of benefit for medium-and high-risk devices; moving toward greater centralization and coordination of regulatory approval in Europe; creating links between device identifier systems and existing data collection tools, such as electronic health records; and fostering increased and more effective use of registries to ensure safe postmarket use of new and existing devices. PMID:24597558

  10. Passive Sampling in Regulatory Chemical Monitoring of Nonpolar Organic Compounds in the Aquatic Environment.

    PubMed

    Booij, Kees; Robinson, Craig D; Burgess, Robert M; Mayer, Philipp; Roberts, Cindy A; Ahrens, Lutz; Allan, Ian J; Brant, Jan; Jones, Lisa; Kraus, Uta R; Larsen, Martin M; Lepom, Peter; Petersen, Jördis; Pröfrock, Daniel; Roose, Patrick; Schäfer, Sabine; Smedes, Foppe; Tixier, Céline; Vorkamp, Katrin; Whitehouse, Paul

    2016-01-05

    We reviewed compliance monitoring requirements in the European Union, the United States, and the Oslo-Paris Convention for the protection of the marine environment of the North-East Atlantic, and evaluated if these are met by passive sampling methods for nonpolar compounds. The strengths and shortcomings of passive sampling are assessed for water, sediments, and biota. Passive water sampling is a suitable technique for measuring concentrations of freely dissolved compounds. This method yields results that are incompatible with the EU's quality standard definition in terms of total concentrations in water, but this definition has little scientific basis. Insufficient quality control is a present weakness of passive sampling in water. Laboratory performance studies and the development of standardized methods are needed to improve data quality and to encourage the use of passive sampling by commercial laboratories and monitoring agencies. Successful prediction of bioaccumulation based on passive sampling is well documented for organisms at the lower trophic levels, but requires more research for higher levels. Despite the existence of several knowledge gaps, passive sampling presently is the best available technology for chemical monitoring of nonpolar organic compounds. Key issues to be addressed by scientists and environmental managers are outlined.

  11. Digital Image Correlation for Performance Monitoring.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palaviccini, Miguel; Turner, Daniel Z.; Herzberg, Michael

    2016-02-01

    Evaluating the health of a mechanism requires more than just a binary evaluation of whether an operation was completed. It requires analyzing more comprehensive, full-field data. Health monitoring is a process of nondestructively identifying characteristics that indicate the fitness of an engineered component. In order to monitor unit health in a production setting, an automated test system must be created to capture the motion of mechanism parts in a real-time and non-intrusive manner. One way to accomplish this is by using high-speed video (HSV) and Digital Image Correlation (DIC). In this approach, individual frames of the video are analyzed tomore » track the motion of mechanism components. The derived performance metrics allow for state-of-health monitoring and improved fidelity of mechanism modeling. The results are in-situ state-of-health identification and performance prediction. This paper introduces basic concepts of this test method, and discusses two main themes: the use of laser marking to add fiducial patterns to mechanism components, and new software developed to track objects with complex shapes, even as they move behind obstructions. Finally, the implementation of these tests into an automated tester is discussed.« less

  12. Transportation monitoring unit qualification

    NASA Technical Reports Server (NTRS)

    Cook, M.

    1990-01-01

    Transportation monitoring unit (TMU) qualification testing was performed between 3 Mar. and 14 Dec. 1989. The purpose of the testing was to qualify the TMUs to monitor and store temperature and acceleration data on redesigned solid rocket motor segments and exit cones while they are being shipped from Utah's Thiokol Corporation, Space Operations, to Kennedy Space Center. TMUs were subjected to transportation tests that concerned the structural integrity of the TMUs only, and did not involve TMU measuring capability. This testing was terminated prior to completion due to mounting plate failures, high and low temperature shutdown failures, and data collection errors. Corrective actions taken by the vendor to eliminate high temperature shutdowns were ineffective. An evaluation was performed on the TMUs to determine the TMU vibration and temperature measuring accuracy at a variety of temperatures. This test demonstrated that TMU measured shock levels are high, and that TMUs are temperature sensitive because of decreased accuracy at high and low temperatures. It was determined that modifications to the current TMU system, such that it could be qualified for use, would require a complete redesign and remanufacture. Because the cost of redesigning and remanufacturing the present TMU system exceeds the cost of procuring a new system that could be qualified without modification, it is recommended that an alternate transportation monitoring system be qualified.

  13. Technical note: Development of a self-contained, indwelling rectal temperature probe for cattle research.

    PubMed

    Reuter, R R; Carroll, J A; Hulbert, L E; Dailey, J W; Galyean, M L

    2010-10-01

    A device was developed to monitor rectal temperature automatically in cattle for application in research settings. Compared with manual measurement of rectal temperature, this device decreases labor and time requirements and allows data collection without the influence of animal handling or restraint. The device consists of a custom-fabricated aluminum tail harness that supports an indwelling rectal temperature data logger. Materials cost approximately US $300 per unit, and units are completely reusable. Use of this device would increase the conditions under which accurate rectal temperature measurements can be obtained in experiments with cattle.

  14. 40 CFR 75.12 - Specific provisions for monitoring NOX emission rate.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.12 Specific provisions for monitoring NOX emission rate. (a) Coal-fired units, gas-fired nonpeaking units or oil-fired... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Specific provisions for monitoring NOX...

  15. 40 CFR 75.12 - Specific provisions for monitoring NOX emission rate.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.12 Specific provisions for monitoring NOX emission rate. (a) Coal-fired units, gas-fired nonpeaking units or oil-fired... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Specific provisions for monitoring NOX...

  16. 40 CFR 75.12 - Specific provisions for monitoring NOX emission rate.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.12 Specific provisions for monitoring NOX emission rate. (a) Coal-fired units, gas-fired nonpeaking units or oil-fired... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Specific provisions for monitoring NOX...

  17. 40 CFR 75.14 - Specific provisions for monitoring opacity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.14 Specific provisions for monitoring opacity. (a) Coal-fired units and oil-fired units. The owner or operator shall meet the general... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Specific provisions for monitoring...

  18. 40 CFR 75.14 - Specific provisions for monitoring opacity.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.14 Specific provisions for monitoring opacity. (a) Coal-fired units and oil-fired units. The owner or operator shall meet the general... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Specific provisions for monitoring...

  19. 40 CFR 75.12 - Specific provisions for monitoring NOX emission rate.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.12 Specific provisions for monitoring NOX emission rate. (a) Coal-fired units, gas-fired nonpeaking units or oil-fired... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Specific provisions for monitoring NOX...

  20. 40 CFR 75.14 - Specific provisions for monitoring opacity.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.14 Specific provisions for monitoring opacity. (a) Coal-fired units and oil-fired units. The owner or operator shall meet the general... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Specific provisions for monitoring...

  1. 40 CFR 75.12 - Specific provisions for monitoring NOX emission rate.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.12 Specific provisions for monitoring NOX emission rate. (a) Coal-fired units, gas-fired nonpeaking units or oil-fired... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Specific provisions for monitoring NOX...

  2. 40 CFR 75.14 - Specific provisions for monitoring opacity.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.14 Specific provisions for monitoring opacity. (a) Coal-fired units and oil-fired units. The owner or operator shall meet the general... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Specific provisions for monitoring...

  3. 40 CFR 75.14 - Specific provisions for monitoring opacity.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Monitoring Provisions § 75.14 Specific provisions for monitoring opacity. (a) Coal-fired units and oil-fired units. The owner or operator shall meet the general... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Specific provisions for monitoring...

  4. Bedside burr hole for intracranial pressure monitoring performed by intensive care physicians. A 5-year experience.

    PubMed

    Bochicchio, M; Latronico, N; Zappa, S; Beindorf, A; Candiani, A

    1996-10-01

    To assess the results of a 5-year experience with bedside burr hole for intracranial pressure (ICP) monitoring performed by intensive care physicians. Prospective, observational study in 120 patients. A general-neurologic Intensive Care Unit in a University Hospital. Patients admitted for acute neural lesion requiring ICP monitoring. A 2.71 mm burr hole was made with positioning of a subarachnoid screw, through which a miniaturized fiberoptic, tip transducer device (Camino) was advanced and inserted 2 mm in the frontal cortex. Over a 5-year period 120 patients, mainly with severe head trauma, underwent ICP monitoring. None of the planned patients was excluded because of technical difficulties. No life-threatening complications were reported, and the overall morbidity rate related to the ICP monitor was 3.3%. Complications were infectious in nature, with 2.5% wound infections and 0.8% meningitis. Although seven patients bled when opening the dura, no intracranial hematomas were recorded due to the ICP monitor. The fiberoptic device was left in place for 5 +/- 1.6 (SD) days (range 1-12 days). Five patients (4.1%) required catheter substitution due to breakage of the system components (fiberoptics). Bedside insertion of a ICP monitor performed by intensive care physicians is a safe procedure, with a complication rate comparable to other series published by neurosurgeons. The overall morbidity rate is comparable to, or even lower than, that caused by central vein catheterization.

  5. Microsensors for border patrol applications

    NASA Astrophysics Data System (ADS)

    Falkofske, Dwight; Krantz, Brian; Shimazu, Ron; Berglund, Victor

    2005-05-01

    A top concern in homeland security efforts is the lack of ability to monitor the thousands of miles of open border with our neighbors. It is not currently feasible to continually monitor the borders for illegal intrusions. The MicroSensor System (MSS) seeks to achieve a low-cost monitoring solution that can be efficiently deployed for border patrol applications. The modifications and issues regarding the unique requirements of this application will be discussed and presented. The MicroSensor System was developed by the Defense Microelectronics Activity (DMEA) for military applications, but border patrol applications, with their unique sensor requirements, demand careful adaptation and modification from the military application. Adaptation of the existing sensor design for border applications has been initiated. Coverage issues, communications needs, and other requirements need to be explored for the border patrol application. Currently, border patrol has a number of deficiencies that can be addressed with a microsensor network. First, a distributed networked sensor field could mitigate the porous border intruder detection problem. Second, a unified database needs to be available to identify aliens attempting to cross into the United States. This database needs to take unique characteristics (e.g. biometrics, fingerprints) recovered from a specialized field unit to reliably identify intruders. Finally, this sensor network needs to provide a communication ability to allow border patrol officers to have quick access to intrusion information as well as equipment tracking and voice communication. MSS already addresses the sensing portion of the solution, including detection of acoustic, infrared, magnetic, and seismic events. MSS also includes a low-power networking protocol to lengthen the battery life. In addition to current military requirements, MSS needs a solar panel solution to extend its battery life to 5 years, and an additional backbone communication link. Expanding the capabilities of MSS will go a long way to improving the security of the nation's porous borders.

  6. Markerless video analysis for movement quantification in pediatric epilepsy monitoring.

    PubMed

    Lu, Haiping; Eng, How-Lung; Mandal, Bappaditya; Chan, Derrick W S; Ng, Yen-Ling

    2011-01-01

    This paper proposes a markerless video analytic system for quantifying body part movements in pediatric epilepsy monitoring. The system utilizes colored pajamas worn by a patient in bed to extract body part movement trajectories, from which various features can be obtained for seizure detection and analysis. Hence, it is non-intrusive and it requires no sensor/marker to be attached to the patient's body. It takes raw video sequences as input and a simple user-initialization indicates the body parts to be examined. In background/foreground modeling, Gaussian mixture models are employed in conjunction with HSV-based modeling. Body part detection follows a coarse-to-fine paradigm with graph-cut-based segmentation. Finally, body part parameters are estimated with domain knowledge guidance. Experimental studies are reported on sequences captured in an Epilepsy Monitoring Unit at a local hospital. The results demonstrate the feasibility of the proposed system in pediatric epilepsy monitoring and seizure detection.

  7. The use of plants for environmental monitoring and assessment.

    PubMed

    Wang, W; Freemark, K

    1995-04-01

    This paper presents a critical review on phytotoxicity tests for environmental monitoring and assessment. Vascular macrophytes used in the laboratory testing are emphasized; algae are mentioned only for comparison. Several issues are discussed, including the rationale for and misconceptions about phytotoxicity tests, relation to regulation, status of phytotoxicity test protocols, advantages and disadvantages of phytotoxicity tests, and possible research directions. Aquatic and terrestrial macrophytes, along with algae, are essential components of ecosystems. Macrophytes are becoming more important for the monitoring and assessment of herbicides, effluents, and industrial chemicals. In the United States, Canada, and international organizations, phytotoxicity tests can be required for environmental monitoring and assessment in statutes such as Federal Insecticide, Fungicide, and Rodenticide Act; Toxic Substances Control Act; Water Quality Act; Canadian Pest Control Products Act; and Canadian Environmental Protection Act. Possible research directions for phytotoxicity tests are discussed relative to the role in regulations of industrial chemicals, effluents, hazardous waste sites, and pesticides.

  8. The swiss neonatal quality cycle, a monitor for clinical performance and tool for quality improvement

    PubMed Central

    2013-01-01

    Background We describe the setup of a neonatal quality improvement tool and list which peer-reviewed requirements it fulfils and which it does not. We report on the so-far observed effects, how the units can identify quality improvement potential, and how they can measure the effect of changes made to improve quality. Methods Application of a prospective longitudinal national cohort data collection that uses algorithms to ensure high data quality (i.e. checks for completeness, plausibility and reliability), and to perform data imaging (Plsek’s p-charts and standardized mortality or morbidity ratio SMR charts). The collected data allows monitoring a study collective of very low birth-weight infants born from 2009 to 2011 by applying a quality cycle following the steps ′guideline – perform - falsify – reform′. Results 2025 VLBW live-births from 2009 to 2011 representing 96.1% of all VLBW live-births in Switzerland display a similar mortality rate but better morbidity rates when compared to other networks. Data quality in general is high but subject to improvement in some units. Seven measurements display quality improvement potential in individual units. The methods used fulfil several international recommendations. Conclusions The Quality Cycle of the Swiss Neonatal Network is a helpful instrument to monitor and gradually help improve the quality of care in a region with high quality standards and low statistical discrimination capacity. PMID:24074151

  9. 40 CFR 75.24 - Out-of-control periods and adjustment for system bias.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subsequent tests: (1) Apply the procedures for missing data substitution to emissions from affected unit(s... monitor or continuous emission monitoring system is out-of-control, any data recorded by the monitor or monitoring system are not quality-assured and shall not be used in calculating monitor data availabilities...

  10. 40 CFR 75.24 - Out-of-control periods and adjustment for system bias.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... subsequent tests: (1) Apply the procedures for missing data substitution to emissions from affected unit(s... monitor or continuous emission monitoring system is out-of-control, any data recorded by the monitor or monitoring system are not quality-assured and shall not be used in calculating monitor data availabilities...

  11. 40 CFR 75.24 - Out-of-control periods and adjustment for system bias.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... subsequent tests: (1) Apply the procedures for missing data substitution to emissions from affected unit(s... monitor or continuous emission monitoring system is out-of-control, any data recorded by the monitor or monitoring system are not quality-assured and shall not be used in calculating monitor data availabilities...

  12. 40 CFR 75.24 - Out-of-control periods and adjustment for system bias.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subsequent tests: (1) Apply the procedures for missing data substitution to emissions from affected unit(s... monitor or continuous emission monitoring system is out-of-control, any data recorded by the monitor or monitoring system are not quality-assured and shall not be used in calculating monitor data availabilities...

  13. A novel horizontal subsurface flow constructed wetland: Reducing area requirements and clogging risk.

    PubMed

    Tatoulis, Triantafyllos; Akratos, Christos S; Tekerlekopoulou, Athanasia G; Vayenas, Dimitrios V; Stefanakis, Alexandros I

    2017-11-01

    The use of Constructed Wetlands (CWs) has been nowadays expanded from municipal to industrial and agro-industrial wastewaters. The main limitations of CWs remain the relatively high area requirements compared to mechanical treatment technologies and the potential occurrence of the clogging phenomenon. This study presents the findings of an innovative CW design where novel materials were used. Four pilot-scale CW units were designed, built and operated for two years. Each unit consisted of two compartments, the first of which (two thirds of the total unit length) contained either fine gravel (in two units) or random type high density polyethylene (HDPE) (in the other two units). This plastic media type was tested in a CW system for the first time. The second compartment of all four units contained natural zeolite. Two units (one with fine gravel and one with HDPE) were planted with common reeds, while the other two were kept unplanted. Second cheese whey was introduced into the units, which were operated under hydraulic residence times (HRT) of 2 and 4 days. After a two-year operation and monitoring period, pollutant removal rates were approximately 80%, 75% and 90% for COD, ammonium and ortho-phosphate, respectively, while temperature and HRT had no significant effect on pollutant removal. CWs containing the plastic media achieved the same removal rates as those containing gravel, despite receiving three times higher hydraulic surface loads (0.08 m/d) and four times higher organic surface loads (620 g/m 2 /d). This reveals that the use of HDPE plastic media could reduce CW surface area requirements by 75%. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Safeguard monitoring of direct electrolytic reduction

    NASA Astrophysics Data System (ADS)

    Jurovitzki, Abraham L.

    Nuclear power is regaining global prominence as a sustainable energy source as the world faces the consequences of depending on limited fossil based, CO2 emitting fuels. A key component to achieving this sustainability is to implement a closed nuclear fuel cycle. Without achieving this goal, a relatively small fraction of the energy value in nuclear fuel is actually utilized. This involves recycling of spent nuclear fuel (SNF)---separating fissile actinides from waste products and using them to fabricate fresh fuel. Pyroprocessing is a viable option being developed for this purpose with a host of benefits compared to other recycling options, such as PUREX. Notably, pyroprocessing is ill suited to separate pure plutonium from spent fuel and thus has non-proliferation benefits. Pyroprocessing involves high temperature electrochemical and chemical processing of SNF in a molten salt electrolyte. During this batch process, several intermediate and final streams are produced that contain radioactive material. While pyroprocessing is ineffective at separating pure plutonium, there are various process misuse scenarios that could result in diversion of impure plutonium into one or more of these streams. This is a proliferation risk that should be addressed with innovative safeguards technology. One approach to meeting this challenge is to develop real time monitoring techniques that can be implemented in the hot cells and coupled with the various unit operations involved with pyroprocessing. Current state of the art monitoring techniques involve external chemical assaying which requires sample removal from these unit operations. These methods do not meet International Atomic Energy Agency's (IAEA) timeliness requirements. In this work, a number of monitoring techniques were assessed for their viability as online monitoring tools. A hypothetical diversion scenario for the direct electrolytic reduction process was experimentally verified (using Nd2O3 as a surrogate for PuO2). Electrochemical analysis was demonstrated to be effective at detecting even very dilute concentrations of actinides as evidence for a diversion attempt.

  15. 40 CFR Table 3 to Subpart Rrr of... - Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... output from bag leak detector. COM or Design and install in accordance with PS-1; collect data in... Detection Guidance c; record voltage output from bag leak detector. COM Design and Install in accordance... Guidance” c; record output voltage from bag leak detector. COM Design and install in accordance with PS-1...

  16. 40 CFR Table 3 to Subpart Rrr of... - Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... output from bag leak detector. COM or Design and install in accordance with PS-1; collect data in... Detection Guidance c; record voltage output from bag leak detector. COM Design and Install in accordance... Guidance” c; record output voltage from bag leak detector. COM Design and install in accordance with PS-1...

  17. Helicopter Fatigue Life Assessment

    DTIC Science & Technology

    1981-03-01

    is made to bring together alternative statistical opinions. 1. INTRODUCTION In almost arn paper on helicopter fatigue (references 1-15) a diagram is...of fatigue life calculations. In the excercise of the A.H.S., mentioned in the introduction the ratios of fatljue life, based on a cycle counting...monitoring. I INTRODUCTION The requirements for the design of structures of United Kingdom Military aeroplanes against fatigue are contained in Aviation

  18. 40 CFR 49.23 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... recertification events. When valid SO2 pounds per hour, NO2 pounds per hour, or NO2 pounds per million Btu... approval. (ii) In the event that the owner or operator is unable to develop the plan required in paragraph... requested by the Regional Administrator. (vii) In the event that a program for parameter monitoring on Units...

  19. 40 CFR 49.23 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recertification events. When valid SO2 pounds per hour, NO2 pounds per hour, or NO2 pounds per million Btu... approval. (ii) In the event that the owner or operator is unable to develop the plan required in paragraph... requested by the Regional Administrator. (vii) In the event that a program for parameter monitoring on Units...

  20. Accuracy and time requirements of a bar-code inventory system for medical supplies.

    PubMed

    Hanson, L B; Weinswig, M H; De Muth, J E

    1988-02-01

    The effects of implementing a bar-code system for issuing medical supplies to nursing units at a university teaching hospital were evaluated. Data on the time required to issue medical supplies to three nursing units at a 480-bed, tertiary-care teaching hospital were collected (1) before the bar-code system was implemented (i.e., when the manual system was in use), (2) one month after implementation, and (3) four months after implementation. At the same times, the accuracy of the central supply perpetual inventory was monitored using 15 selected items. One-way analysis of variance tests were done to determine any significant differences between the bar-code and manual systems. Using the bar-code system took longer than using the manual system because of a significant difference in the time required for order entry into the computer. Multiple-use requirements of the central supply computer system made entering bar-code data a much slower process. There was, however, a significant improvement in the accuracy of the perpetual inventory. Using the bar-code system for issuing medical supplies to the nursing units takes longer than using the manual system. However, the accuracy of the perpetual inventory was significantly improved with the implementation of the bar-code system.

  1. On the importance of incorporating sampling weights in ...

    EPA Pesticide Factsheets

    Occupancy models are used extensively to assess wildlife-habitat associations and to predict species distributions across large geographic regions. Occupancy models were developed as a tool to properly account for imperfect detection of a species. Current guidelines on survey design requirements for occupancy models focus on the number of sample units and the pattern of revisits to a sample unit within a season. We focus on the sampling design or how the sample units are selected in geographic space (e.g., stratified, simple random, unequal probability, etc). In a probability design, each sample unit has a sample weight which quantifies the number of sample units it represents in the finite (oftentimes areal) sampling frame. We demonstrate the importance of including sampling weights in occupancy model estimation when the design is not a simple random sample or equal probability design. We assume a finite areal sampling frame as proposed for a national bat monitoring program. We compare several unequal and equal probability designs and varying sampling intensity within a simulation study. We found the traditional single season occupancy model produced biased estimates of occupancy and lower confidence interval coverage rates compared to occupancy models that accounted for the sampling design. We also discuss how our findings inform the analyses proposed for the nascent North American Bat Monitoring Program and other collaborative synthesis efforts that propose h

  2. Systems workplace for endoscopic surgery.

    PubMed

    Irion, K M; Novak, P

    2000-01-01

    With the advent of minimally invasive surgery (MIS) a decade ago, the requirements for operating rooms (OR) and their equipment have been increased. Compared with conventional open surgery, the new endoscopic techniques require additional tools. Television systems, for video-assisted image acquisition and visualisation, including cameras, monitors and light systems, as well as insufflators, pumps, high-frequency units, lasers and motorised therapy units, are nowadays usually made available on carts during endoscopic surgery. In conjunction with a set of endoscopic instruments, these high-tech units allow new operating techniques to be performed. The benefit for patients has become clear in recent years; however, the technical complexity of OR has also increased considerably. To minimise this problem for the OR personnel, the MIS concept 'OR1' (Operating Room 1) was developed and implemented. OR1 is a fully functional and integrated multi-speciality surgical suite for MIS. The centrepieces of the OR1 are the Storz Communication Bus (SCB) and the advanced image and data archiving system (Aida) from Karl Storz, Tuttlingen, Germany. Both components allow monitoring, access and networking of the MIS equipment and other OR facilities, as well as the acquisition, storage and display of image, patient and equipment data during the endoscopic procedure. A central user interface allows efficient, simplified operation and online clinical images. Due to the system integration, the handling of complex equipment is considerably simplified, logistical procedures in the OR are improved, procedure times are shorter and, particularly noteworthy, operative risk can be reduced through simplified device operation.

  3. Multi-terminal remote monitoring and warning system using Micro Air Vehicle for dangerous environment

    NASA Astrophysics Data System (ADS)

    Yu, Yanan; Wang, Xiaoxun; He, Chengcheng; Lai, Chenlong; Liu, Yuanchao

    2015-11-01

    For overcoming the problems such as remote operation and dangerous tasks, multi-terminal remote monitoring and warning system based on STC89C52 Micro Control Unit and wireless communication technique was proposed. The system with MCU as its core adopted multiple sets of sensor device to monitor environment parameters of different locations, such as temperature, humidity, smoke other harmful gas concentration. Data information collected was transmitted remotely by wireless transceiver module, and then multi-channel data parameter was processed and displayed through serial communication protocol between the module and PC. The results of system could be checked in the form of web pages within a local network which plays a wireless monitoring and warning role. In a remote operation, four-rotor micro air vehicle which fixed airborne data acquisition device was utilized as a middleware between collecting terminal and PC to increase monitoring scope. Whole test system has characteristics of simple construction, convenience, real time ability and high reliability, which could meet the requirements of actual use.

  4. OLAM: A wearable, non-contact sensor for continuous heart-rate and activity monitoring.

    PubMed

    Albright, Ryan K; Goska, Benjamin J; Hagen, Tory M; Chi, Mike Y; Cauwenberghs, G; Chiang, Patrick Y

    2011-01-01

    A wearable, multi-modal sensor is presented that can non-invasively monitor a patient's activity level and heart function concurrently for more than a week. The 4 in(2) sensor incorporates both a non-contact heartrate sensor and a 5-axis inertial measurement unit (IMU), allowing simultaneous heart, respiration, and movement monitoring without requiring physical contact with the skin [1]. Hence, this Oregon State University Life and Activity Monitor (OLAM) provides the unique opportunity to combine motion data with heart-rate information, enabling assessment of actual physical activity beyond conventional movement sensors. OLAM also provides a unique platform for non-contact sensing, enabling the filtering of movement artifacts generated by the non-contact capacitive interface, using the IMU data as a movement noise channel. Intended to be used in clinical trials for weeks at a time with no physician intervention, the OLAM allows continuous non-invasive monitoring of patients, providing the opportunity for long-term observation into a patient's physical activity and subtle longitudinal changes.

  5. Antithrombotic Therapy in Neonates and Children

    PubMed Central

    Monagle, Paul; Chan, Anthony K. C.; Goldenberg, Neil A.; Ichord, Rebecca N.; Journeycake, Janna M.; Nowak-Göttl, Ulrike

    2012-01-01

    Background: Neonates and children differ from adults in physiology, pharmacologic responses to drugs, epidemiology, and long-term consequences of thrombosis. This guideline addresses optimal strategies for the management of thrombosis in neonates and children. Methods: The methods of this guideline follow those described in the Methodology for the Development of Antithrombotic Therapy and Prevention of Thrombosis Guidelines: Antithrombotic Therapy and Prevention of Thrombosis, 9th ed: American College of Chest Physicians Evidence-Based Clinical Practice Guidelines. Results: We suggest that where possible, pediatric hematologists with experience in thromboembolism manage pediatric patients with thromboembolism (Grade 2C). When this is not possible, we suggest a combination of a neonatologist/pediatrician and adult hematologist supported by consultation with an experienced pediatric hematologist (Grade 2C). We suggest that therapeutic unfractionated heparin in children is titrated to achieve a target anti-Xa range of 0.35 to 0.7 units/mL or an activated partial thromboplastin time range that correlates to this anti-Xa range or to a protamine titration range of 0.2 to 0.4 units/mL (Grade 2C). For neonates and children receiving either daily or bid therapeutic low-molecular-weight heparin, we suggest that the drug be monitored to a target range of 0.5 to 1.0 units/mL in a sample taken 4 to 6 h after subcutaneous injection or, alternatively, 0.5 to 0.8 units/mL in a sample taken 2 to 6 h after subcutaneous injection (Grade 2C). Conclusions: The evidence supporting most recommendations for antithrombotic therapy in neonates and children remains weak. Studies addressing appropriate drug target ranges and monitoring requirements are urgently required in addition to site- and clinical situation-specific thrombosis management strategies. PMID:22315277

  6. Experiences from site-specific landslide early warning systems

    NASA Astrophysics Data System (ADS)

    Michoud, C.; Bazin, S.; Blikra, L. H.; Derron, M.-H.; Jaboyedoff, M.

    2013-10-01

    Landslide early warning systems (EWSs) have to be implemented in areas with large risk for populations or infrastructures when classical structural remediation measures cannot be set up. This paper aims to gather experiences of existing landslide EWSs, with a special focus on practical requirements (e.g., alarm threshold values have to take into account the smallest detectable signal levels of deployed sensors before being established) and specific issues when dealing with system implementations. Within the framework of the SafeLand European project, a questionnaire was sent to about one-hundred institutions in charge of landslide management. Finally, we interpreted answers from experts belonging to 14 operational units related to 23 monitored landslides. Although no standard requirements exist for designing and operating EWSs, this review highlights some key elements, such as the importance of pre-investigation work, the redundancy and robustness of monitoring systems, the establishment of different scenarios adapted to gradual increasing of alert levels, and the necessity of confidence and trust between local populations and scientists. Moreover, it also confirms the need to improve our capabilities for failure forecasting, monitoring techniques and integration of water processes into landslide conceptual models.

  7. Design of smart neonatal health monitoring system using SMCC

    PubMed Central

    Mukherjee, Anwesha; Bhakta, Ishita

    2016-01-01

    Automated health monitoring and alert system development is a demanding research area today. Most of the currently available monitoring and controlling medical devices are wired which limits freeness of working environment. Wireless sensor network (WSN) is a better alternative in such an environment. Neonatal intensive care unit is used to take care of sick and premature neonates. Hypothermia is an independent risk factor for neonatal mortality and morbidity. To prevent it an automated monitoring system is required. In this Letter, an automated neonatal health monitoring system is designed using sensor mobile cloud computing (SMCC). SMCC is based on WSN and MCC. In the authors’ system temperature sensor, acceleration sensor and heart rate measurement sensor are used to monitor body temperature, acceleration due to body movement and heart rate of neonates. The sensor data are stored inside the cloud. The health person continuously monitors and accesses these data through the mobile device using an Android Application for neonatal monitoring. When an abnormal situation arises, an alert is generated in the mobile device of the health person. By alerting health professional using such an automated system, early care is provided to the affected babies and the probability of recovery is increased. PMID:28261491

  8. Design of smart neonatal health monitoring system using SMCC.

    PubMed

    De, Debashis; Mukherjee, Anwesha; Sau, Arkaprabha; Bhakta, Ishita

    2017-02-01

    Automated health monitoring and alert system development is a demanding research area today. Most of the currently available monitoring and controlling medical devices are wired which limits freeness of working environment. Wireless sensor network (WSN) is a better alternative in such an environment. Neonatal intensive care unit is used to take care of sick and premature neonates. Hypothermia is an independent risk factor for neonatal mortality and morbidity. To prevent it an automated monitoring system is required. In this Letter, an automated neonatal health monitoring system is designed using sensor mobile cloud computing (SMCC). SMCC is based on WSN and MCC. In the authors' system temperature sensor, acceleration sensor and heart rate measurement sensor are used to monitor body temperature, acceleration due to body movement and heart rate of neonates. The sensor data are stored inside the cloud. The health person continuously monitors and accesses these data through the mobile device using an Android Application for neonatal monitoring. When an abnormal situation arises, an alert is generated in the mobile device of the health person. By alerting health professional using such an automated system, early care is provided to the affected babies and the probability of recovery is increased.

  9. Are stipulated requirements for the quality of maternity care complied with?

    PubMed

    Johansen, Lars T; Pay, Aase Serine Devold; Broen, Lise; Roland, Brit; Øian, Pål

    2017-09-19

    The Directorate of Health’s national guide Et trygt fødetilbud – kvalitetskrav til fødselsomsorgen [A safe maternity service – requirements regarding the quality of maternity care] was published in December 2010 and was intended to provide a basis for an improved and more predictable maternity service. This article presents data from the maternity institutions on compliance with the quality requirements, including information on selection, fetal monitoring, organisation, staffing and competencies. The information was acquired with the aid of an electronic questionnaire in the period January–May 2015. The form was sent by e-mail to the medical officer in charge at all maternity units in Norway as at 1 January 2015 (n=47). There was a 100 % response to the questionnaire. The criteria for selecting where pregnant women should give birth were stated to be in conformity with the quality requirements. Some maternity institutions failed to describe the areas of responsibilities of doctors and midwives (38.5 % and 15.4 %, respectively). Few institutions recorded whether the midwife was present with the patient during the active phase. Half of the maternity departments (level 2 birth units) reported unfilled doctors’ posts, and a third of the university hospitals/central hospitals (level 1 birth units) reported a severe shortage of locum midwives. Half of the level 2 birth units believed that the quality requirements had resulted in improved training, but reported only a limited degree of interdisciplinary or mandatory instruction. The study reveals that there are several areas in which the health enterprises have procedures that conform to national quality requirements, but where it is still unclear whether they are observed in practice. Areas for improvement relate to routines describing areas of responsibility, availability of personnel resources and staff training.

  10. The Damper Spring Unit of the Sentinel 1 Solar Array

    NASA Technical Reports Server (NTRS)

    Doejaaren, Frans; Ellenbroek, Marcel

    2012-01-01

    The Damper Spring Unit (DSU, see Figure 1) has been designed to provide the damping required to control the deployment speed of the spring driven solar array deployment in an ARA Mk3 or FRED based Solar Array in situations where the standard application of a damper at the root-hinge is not feasible. The unit consists of four major parts: a main bracket, an eddy current damper, a spring unit, an actuation pulley which is coupled via Kevlar cables to a synchro-pulley of a hinge. The damper slows down the deployment speed and prevents deployment shocks at deployment completion. The spring unit includes 4 springs which overcome the resistances of the damper and the specific DSU control cable loop. This means it can be added to any spring driven deployment system without major modifications of that system. Engineering models of the Sentinel 1 solar array wing have been built to identify the deployment behavior, and to help to determine the optimal pulley ratios of the solar array and to finalize the DSU design. During the functional tests, the behavior proved to be very sensitive for the alignment of the DSU. This was therefore monitored carefully during the qualification program, especially prior to the TV cold testing. During TV "Cold" testing the measured retarding torque exceeded the max. required value: 284 N-mm versus the required 247 N-mm. Although this requirement was not met, the torque balance analysis shows that the 284 N-mm can be accepted, because the spring unit can provide 1.5 times more torque than required. Some functional tests of the DSU have been performed without the eddy current damper attached. It provided input data for the ADAMS solar array wing model. Simulation of the Sentinel-1 deployment (including DSU) in ADAMS allowed the actual wing deployment tests to be limited in both complexity and number of tests. The DSU for the Sentinel-1 solar array was successfully qualified and the flight models are in production.

  11. 75 FR 1 - Importation of Hass Avocados From Peru

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-04

    ...We are amending the fruits and vegetables regulations to allow the importation of Hass avocados from Peru into the continental United States. As a condition of entry, Hass avocados from Peru will have to be produced in accordance with a systems approach that includes requirements for importation in commercial consignments; registration and monitoring of places of production and packinghouses; grove sanitation; pest-free areas or trapping for the South American fruit fly; pest-free areas or treatment for the Mediterranean fruit fly; surveys for the avocado seed moth; and inspection for quarantine pests by the national plant protection organization of Peru. Hass avocados from Peru will also be required to be accompanied by a phytosanitary certificate with an additional declaration stating that the avocados were grown, packed, and inspected and found to be free of pests in accordance with these requirements. This action will allow the importation of Hass avocados from Peru into the United States while continuing to provide protection against the introduction of quarantine pests.

  12. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziock, Robert; Little, Bonnie Colleen

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less

  13. Preventing violence, exploitation and abuse of persons with mental disabilities: Exploring the monitoring implications of Article 16 of the United Nations Convention on the Rights of Persons with Disabilities.

    PubMed

    Laing, Judy

    Article 16 of the United Nations Convention on the Rights of Persons with Disabilities includes the right to be free from all forms of violence, exploitation and abuse. In pursuance of this aim, Article 16 (3) imposes an obligation on States Parties to 'ensure that all facilities and programmes designed to serve persons with disabilities are effectively monitored by independent authorities'. Effective independent monitoring is viewed as a key mechanism to help safeguard people from violence, exploitation and abuse. This is highly pertinent in the wake of the highly publicized abuse of patients in care homes and hospitals in England in the last few years. This article examines the monitoring requirements of Article 16 and, by drawing on the author's research into the Care Quality Commission (the national health and social care regulator and mental health monitor) in England, assesses the extent to which independent inspection of hospitals and care homes can play a part in realizing Article 16(3) to prevent violence, abuse and exploitation of persons with mental disabilities. The potential scope and reach of Article 16 is extremely wide: this brings with it great potential but, at the same time, significant challenges for achieving effecting monitoring. Some of these challenges are explored and the paper concludes with some consideration of how monitors/inspectors, such as the Care Quality Commission in England, can strengthen their protection for people with mental disabilities, in line with the ethos and aspirations of the CRPD. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Monitoring and Evaluation of Cultivated Land Irrigation Guarantee Capability with Remote Sensing

    NASA Astrophysics Data System (ADS)

    Zhang, C., Sr.; Huang, J.; Li, L.; Wang, H.; Zhu, D.

    2015-12-01

    Abstract: Cultivated Land Quality Grade monitoring and evaluation is an important way to improve the land production capability and ensure the country food safety. Irrigation guarantee capability is one of important aspects in the cultivated land quality monitoring and evaluation. In the current cultivated land quality monitoring processing based on field survey, the irrigation rate need much human resources investment in long investigation process. This study choses Beijing-Tianjin-Hebei as study region, taking the 1 km × 1 km grid size of cultivated land unit with a winter wheat-summer maize double cropping system as study object. A new irrigation capacity evaluation index based on the ratio of the annual irrigation requirement retrieved from MODIS data and the actual quantity of irrigation was proposed. With the years of monitoring results the irrigation guarantee capability of study area was evaluated comprehensively. The change trend of the irrigation guarantee capability index (IGCI) with the agricultural drought disaster area in rural statistical yearbook of Beijing-Tianjin-Hebei area was generally consistent. The average of IGCI value, the probability of irrigation-guaranteed year and the weighted average which controlled by the irrigation demand index were used and compared in this paper. The experiment results indicate that the classification result from the present method was close to that from irrigation probability in the gradation on agriculture land quality in 2012, with overlap of 73% similar units. The method of monitoring and evaluation of cultivated land IGCI proposed in this paper has a potential in cultivated land quality level monitoring and evaluation in China. Key words: remote sensing, evapotranspiration, MODIS cultivated land quality, irrigation guarantee capability Authors: Chao Zhang, Jianxi Huang, Li Li, Hongshuo Wang, Dehai Zhu China Agricultural University zhangchaobj@gmail.com

  15. How Does the United States Rank According to the World Breastfeeding Trends Initiative?

    PubMed

    Cadwell, Karin; Turner-Maffei, Cynthia; Blair, Anna; Brimdyr, Kajsa; OʼConnor, Barbara

    The World Breastfeeding Trends Initiative is an assessment process designed to facilitate an ongoing national appraisal of progress toward the goals of the United Nations Children's Fund (UNICEF)/World Health Organization (WHO) Global Strategy for Infant and Young Child Feeding. More than 80 countries have completed this national assessment, including the United States of America. This article describes the process undertaken by the US World Breastfeeding Trends Initiative team, the findings of the expert panel related to infant and young child feeding policies, programs, and practices and the ranking of the United States compared with the 83 other participating nations. Identified strengths of the United States include data collection and monitoring, especially by the Centers for Disease Control and Prevention, the US Baby-Friendly Hospital Initiative, and the United States Breastfeeding Committee. The absence of a national infant feeding policy, insufficient maternity protection, and lack of preparation for infant and young children feeding in emergencies are key targets identified by the assessment requiring concerted national effort.

  16. 2013 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mike Lewis

    2014-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2012, through October 31, 2013. The report contains, as applicable, the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2013 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plantmore » and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. However, soil samples were collected in October from soil monitoring unit SU-014101.« less

  17. A user friendly database for use in ALARA job dose assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zodiates, A.M.; Willcock, A.

    1995-03-01

    The pressurized water reactor (PWR) design chosen for adoption by Nuclear Electric plc was based on the Westinghouse Standard Nuclear Unit Power Plant (SNUPPS). This design was developed to meet the United Kingdom requirements and these improvements are embodied in the Sizewell B plant which will start commercial operation in 1994. A user-friendly database was developed to assist the station in the dose and ALARP assessments of the work expected to be carried out during station operation and outage. The database stores the information in an easily accessible form and enables updating, editing, retrieval, and searches of the information. Themore » database contains job-related information such as job locations, number of workers required, job times, and the expected plant doserates. It also contains the means to flag job requirements such as requirements for temporary shielding, flushing, scaffolding, etc. Typical uses of the database are envisaged to be in the prediction of occupational doses, the identification of high collective and individual dose jobs, use in ALARP assessments, setting of dose targets, monitoring of dose control performance, and others.« less

  18. On-line coupling of a miniaturized bioreactor with capillary electrophoresis, via a membrane interface, for monitoring the production of organic acids by microorganisms.

    PubMed

    Ehala, S; Vassiljeva, I; Kuldvee, R; Vilu, R; Kaljurand, M

    2001-09-01

    Capillary electrophoresis (CE) can be a valuable tool for on-line monitoring of bioprocesses. Production of organic acids by phosphorus-solubilizing bacteria and fermentation of UHT milk were monitored and controlled by use of a membrane-interfaced dialysis device and a home-made microsampler for a capillary electrophoresis unit. Use of this specially designed sampling device enabled rapid consecutive injections without interruption of the high voltage. No additional sample preparation was required. The time resolution of monitoring in this particular work was approximately 2 h, but could be reduced to 2 min. Analytes were detected at low microg mL(-1) levels with a reproducibility of approximately 10%. To demonstrate the potential of CE in processes of biotechnological interest, results from monitoring phosphate solubilization by bacteria were submitted to qualitative and quantitative analysis. Fermentation experiments on UHT milk showed that monitoring of the processes by CE can provide good resolution of complex mixtures, although for more specific, detailed characterization the identification of individual substances is needed.

  19. Operational considerations in monitoring oxygen levels at the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Zalenski, M. A.; Rowe, E. L.; Mcphee, J. R.

    1985-01-01

    Laboratory monitoring of the level of oxygen in sample gas mixtures is a process which can be performed with accurate and repeatable results. Operations at the National Transonic Facility require the storage and pumping of large volumes of liquid nitrogen. To protect against the possibility of a fault resulting in a localized oxygen deficient atmosphere, the facility is equipped with a monitoring system with an array of sensors. During the early operational stages, the system produced recurrent alarms, none of which could be traced to a true oxygen deficiency. A thorough analysis of the system was undertaken with primary emphasis placed on the sensor units. These units sense the partial pressure of oxygen which, after signal conditioning, is presented as a % by volume indication at the system output. It was determined that many of the problems experienced were due to a lack of proper accounting for the partial pressure/% by volume relationship, with a secondary cause being premature sensor failure. Procedures were established to consider atmospherically induced partial pressure variations. Sensor rebuilding techniques were examined, and those elements contributing to premature sensor failure were identified. The system now operates with a high degree of confidence and reliability.

  20. Miniaturized, on-head, invasive electrode connector integrated EEG data acquisition system.

    PubMed

    Ives, John R; Mirsattari, Seyed M; Jones, D

    2007-07-01

    Intracranial electroencephalogram (EEG) monitoring involves recording multi-contact electrodes. The current systems require separate wires from each recording contact to the data acquisition unit resulting in many connectors and cables. To overcome limitations of such systems such as noise, restrictions in patient mobility and compliance, we developed a miniaturized EEG monitoring system with the amplifiers and multiplexers integrated into the electrode connectors and mounted on the head. Small, surface-mounted instrumentation amplifiers, coupled with 8:1 analog multiplexers, were assembled into 8-channel modular units to connect to 16:1 analog multiplexer manifold to create a small (55 cm(3)) head-mounted 128-channel system. A 6-conductor, 30 m long cable was used to transmit the EEG signals from the patient to the remote data acquisition system. Miniaturized EEG amplifiers and analog multiplexers were integrated directly into the electrode connectors. Up to 128-channels of EEG were amplified and analog multiplexed directly on the patient's head. The amplified EEG data were obtained over one long wire. A miniaturized system of invasive EEG recording has the potential to reduce artefact, simplify trouble-shooting, lower nursing care and increase patient compliance. Miniaturization technology improves intracranial EEG monitoring and leads to >128-channel capacity.

Top