40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2011 CFR
2011-07-01
... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Continuous methane monitoring device... Installations § 77.211-1 Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment. Continuous methane monitoring devices shall be set to deenergize...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Continuous methane monitoring device... Installations § 77.211-1 Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment. Continuous methane monitoring devices shall be set to deenergize...
Code of Federal Regulations, 2013 CFR
2013-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.2944 Section 60.2944 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2012 CFR
2012-07-01
... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon...
40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2014 CFR
2014-07-01
... installed in each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag... hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner or operator must install, calibrate, maintain, and operate a CEMS for monitoring hydrogen chloride emissions discharged to...
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.3043 Section 60.3043 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission...
40 CFR 60.3038 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2011 CFR
2011-07-01
... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...
40 CFR 60.3038 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2010 CFR
2010-07-01
... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...
40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuously operate a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a...
Code of Federal Regulations, 2011 CFR
2011-07-01
... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...
Code of Federal Regulations, 2010 CFR
2010-07-01
... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2013 CFR
2013-07-01
... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2014 CFR
2014-07-01
... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? 63.2164 Section 63.2164 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR...
Code of Federal Regulations, 2011 CFR
2011-07-01
... opacity monitoring system and how are the data used? 60.1760 Section 60.1760 Protection of Environment... continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each continuous opacity...
Code of Federal Regulations, 2011 CFR
2011-07-01
... opacity monitoring system and how are the data used? 62.15215 Section 62.15215 Protection of Environment... required for my continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each...
40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2010 CFR
2010-07-01
... a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a manner...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...
Code of Federal Regulations, 2010 CFR
2010-07-01
... paragraphs (a) and (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you establish operating limits...
Code of Federal Regulations, 2011 CFR
2011-07-01
... paragraphs (a) and (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you establish operating limits...
40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring system for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...
40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring systems for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...
40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring systems for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...
40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring system for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...
40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...
40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2014 CFR
2014-07-01
... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...
40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2012 CFR
2012-07-01
... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...
40 CFR 63.1383 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... manufacturing facility must prepare for each glass-melting furnace, rotary spin manufacturing line, and flame... glass-melting furnace, the owner or operator shall install, calibrate, maintain, and continuously... monitors. (v) A triboelectric bag leak detection system shall be installed, operated, adjusted, and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... (ii) of this section for each gas temperature monitoring device. (i) Locate the temperature sensor in... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i...
Code of Federal Regulations, 2011 CFR
2011-07-01
... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if...
Code of Federal Regulations, 2010 CFR
2010-07-01
... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if...
Code of Federal Regulations, 2011 CFR
2011-07-01
... (ii) of this section for each gas temperature monitoring device. (i) Locate the temperature sensor in... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i...
Code of Federal Regulations, 2011 CFR
2011-07-01
...: (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer...) For a catalytic oxidizer, install gas temperature monitors upstream and/or downstream of the catalyst... the requirements in paragraphs (a) and (c)(3)(i) through (v) of this section for each gas temperature...
Code of Federal Regulations, 2010 CFR
2010-07-01
...: (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer...) For a catalytic oxidizer, install gas temperature monitors upstream and/or downstream of the catalyst... the requirements in paragraphs (a) and (c)(3)(i) through (v) of this section for each gas temperature...
40 CFR 63.5855 - What are my monitor installation and operation requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitor installation and operation requirements? 63.5855 Section 63.5855 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards...
40 CFR 63.5855 - What are my monitor installation and operation requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my monitor installation and operation requirements? 63.5855 Section 63.5855 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kartashov,V.V.; Pratt,W.; Romanov, Y.A.
The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Departmentmore » of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.« less
40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2013 CFR
2013-07-01
... installed in each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag... test. (g) For waste-burning kilns not equipped with a wet scrubber, in place of hydrogen chloride..., maintain, and operate a continuous emission monitoring system for monitoring hydrogen chloride emissions...
40 CFR 63.2366 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my monitoring installation... Distribution (Non-Gasoline) Testing and Initial Compliance Requirements § 63.2366 What are my monitoring... controlling storage tanks and low throughput transfer racks, you must submit a monitoring plan according to...
40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2014 CFR
2014-07-01
... systems must I install for gaseous pollutants? 60.1720 Section 60.1720 Protection of Environment... or Before August 30, 1999 Model Rule-Continuous Emission Monitoring § 60.1720 What continuous..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide...
40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2012 CFR
2012-07-01
... systems must I install for gaseous pollutants? 60.1720 Section 60.1720 Protection of Environment... or Before August 30, 1999 Model Rule-Continuous Emission Monitoring § 60.1720 What continuous..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide...
40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... systems must I install for gaseous pollutants? 60.1720 Section 60.1720 Protection of Environment... or Before August 30, 1999 Model Rule-Continuous Emission Monitoring § 60.1720 What continuous..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...
Code of Federal Regulations, 2011 CFR
2011-07-01
... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i) If you...
Code of Federal Regulations, 2010 CFR
2010-07-01
... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i) If you...
40 CFR 63.7830 - What are my monitoring requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) of this section. (1) Install, operate, and maintain a bag leak detection system according to § 63... § 63.7832; or (2) If you do not install and operate a bag leak detection system, you must install... bag leak detection system and COMS are not required for a baghouse that meets the requirements in...
Code of Federal Regulations, 2010 CFR
2010-07-01
..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... gas temperature monitors upstream and/or downstream of the catalyst bed as required in § 63.3967(b... (a) and (c)(3)(i) through (v) of this section for each gas temperature monitoring device. (i) Locate...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... gas temperature monitors upstream and/or downstream of the catalyst bed as required in § 63.3967(b... (a) and (c)(3)(i) through (v) of this section for each gas temperature monitoring device. (i) Locate...
Code of Federal Regulations, 2010 CFR
2010-07-01
... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If a gas...) of this section. (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If a gas...) of this section. (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
40 CFR 60.264 - Emission monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Emission monitoring. 60.264 Section 60... Facilities § 60.264 Emission monitoring. (a) The owner or operator subject to the provisions of this subpart shall install, calibrate, maintain and operate a continuous monitoring system for measurement of the...
40 CFR 61.126 - Monitoring of operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator of any source subject to this subpart using a wet-scrubbing emission control device shall install... manufacturer to be accurate within ±250 pascal (±1 inch of water). The owner or operator of any source subject to this subpart using a wet-scrubbing emission control device shall also install, calibrate, maintain...
40 CFR 61.126 - Monitoring of operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operator of any source subject to this subpart using a wet-scrubbing emission control device shall install... manufacturer to be accurate within ±250 pascal (±1 inch of water). The owner or operator of any source subject to this subpart using a wet-scrubbing emission control device shall also install, calibrate, maintain...
40 CFR Table 12 to Subpart G of... - Monitoring Requirements for Treatment Processes
Code of Federal Regulations, 2013 CFR
2013-07-01
... Appropriate methods as specified in § 63.143 and as approved by permitting authority. 2. Steam stripper (i... recorder. (ii) Wastewater feed mass flow rate; and Continuously Liquid flow meter installed at stripper... operating temperature Continuously (A) Liquid temperature monitoring device installed at stripper influent...
40 CFR Table 12 to Subpart G of... - Monitoring Requirements for Treatment Processes
Code of Federal Regulations, 2010 CFR
2010-07-01
... Appropriate methods as specified in § 63.143 and as approved by permitting authority. 2. Steam stripper (i... recorder. (ii) Wastewater feed mass flow rate; and Continuously Liquid flow meter installed at stripper... operating temperature Continuously (A) Liquid temperature monitoring device installed at stripper influent...
40 CFR Table 12 to Subpart G of... - Monitoring Requirements for Treatment Processes
Code of Federal Regulations, 2011 CFR
2011-07-01
... Appropriate methods as specified in § 63.143 and as approved by permitting authority. 2. Steam stripper (i... recorder. (ii) Wastewater feed mass flow rate; and Continuously Liquid flow meter installed at stripper... operating temperature Continuously (A) Liquid temperature monitoring device installed at stripper influent...
40 CFR Table 12 to Subpart G of... - Monitoring Requirements for Treatment Processes
Code of Federal Regulations, 2014 CFR
2014-07-01
... Appropriate methods as specified in § 63.143 and as approved by permitting authority. 2. Steam stripper (i... recorder. (ii) Wastewater feed mass flow rate; and Continuously Liquid flow meter installed at stripper... operating temperature Continuously (A) Liquid temperature monitoring device installed at stripper influent...
40 CFR Table 12 to Subpart G of... - Monitoring Requirements for Treatment Processes
Code of Federal Regulations, 2012 CFR
2012-07-01
... Appropriate methods as specified in § 63.143 and as approved by permitting authority. 2. Steam stripper (i... recorder. (ii) Wastewater feed mass flow rate; and Continuously Liquid flow meter installed at stripper... operating temperature Continuously (A) Liquid temperature monitoring device installed at stripper influent...
40 CFR 60.454 - Monitoring of emissions and operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Industrial Surface Coating: Large Appliances § 60.454 Monitoring of emissions and operations. (a) The owner... device shall be installed in the gas stream immediately before and after the catalyst bed. (2) Each...
40 CFR 63.11527 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2010 CFR
2010-07-01
... an existing affected source, you may install, operate, and maintain a bag leak detection system for.... If you own or operate a new affected source, you must install, operate, and maintain a bag leak... foot) or less. (ii) The bag leak detection system sensor must provide output of relative PM loadings...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2010 CFR
2010-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air... baghouse applied to pushing emissions, you must install, operate, and maintain each bag leak detection...
Code of Federal Regulations, 2014 CFR
2014-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2012 CFR
2012-07-01
... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2014 CFR
2014-07-01
... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2013 CFR
2013-07-01
... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...
40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... assurance or control activities (including, as applicable, calibration checks and required zero and span... applicable, calibration checks and required zero and span adjustments) do not constitute monitoring... required zero and span adjustments), you must conduct all monitoring in continuous operation at all times...
40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... assurance or control activities (including, as applicable, calibration checks and required zero and span... applicable, calibration checks and required zero and span adjustments) do not constitute monitoring... required zero and span adjustments), you must conduct all monitoring in continuous operation at all times...
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...
40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., operate, and maintain a CEMS to monitor CO and either O2 or CO2 according to the requirements in... program must be part of the maintenance plan for the engine. (j) If you own or operate a stationary SI...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2010 CFR
2010-07-01
... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as... detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be... specifications and recommendations. (3) The bag leak detection system must be certified by the manufacturer to be...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2011 CFR
2011-07-01
... alarm system that will sound automatically when an increase in relative particulate matter emissions over a preset level is detected. The alarm must be located where it is easily heard by plant operating personnel. (7) For positive pressure fabric filter systems, a bag leak detection system must be installed in...
40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuity, and all mechanical connections for leakage. (d) For each pH measurement device, you must meet the... integrity and all electrical connections for continuity. (e) For each bag leak detection system, you must... leak detection system must be installed, calibrated, operated, and maintained according to the “Fabric...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2011 CFR
2011-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2014 CFR
2014-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2012 CFR
2012-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... sensitivity of 0.5 inch of water or a transducer with a minimum measurement sensitivity of 1 percent of the...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCDANIEL, K.S.
1999-09-01
The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.
Unit undergoes controls upgrade to meet cycling needs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weston, B.; Tinkham, R.; Chloupek, J.
1994-04-01
New England Electric System's Brayton Point Unit 3, Somerset, Mass, along with many other units in the US, has been forced into cycling operation on a much more frequent basis than was intended when the original controls were installed. Low-load operation and lengthy startup times also had to be addressed. An integrated control and monitoring system installed at Unit 3 to handle the boiler/turbine controls, burner management, and equipment monitoring functions. New strategies, particularly with the startup valves, were implemented to provide faster, safer, and more economical startups. The retrofit has been a success, with marked improvement in both startupmore » and operation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Copland, John Robin
2014-09-01
This installation report describes the May through July 2014 drilling activities performed for the installation of three multi-port soil-vapor monitoring wells (MWL-SV03, MWL-SV04, and MWL-SV05) at the Mixed Waste Landfill (MWL), which is located at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy (DOE)/National Nuclear Security Administration. The MWL is designated as Solid Waste Management Unit (SWMU) 76 and is located in Technical Area (TA) III (Figure 1-1). The locations of the three soil-vapor monitoring wells (MWL-SV03, MWL-SV04, andmore » MWL-SV05) are shown in Figure 1-2« less
GOES data-collection system instrumentation, installation, and maintenance manual
Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.
1986-01-01
The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)
40 CFR 63.11553 - What are my notification, reporting, and recordkeeping requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operator that installs bag leak detection systems: “This facility has installed a bag leak detection system in accordance with § 63.11552(b)(3) or (c), has prepared a bag leak detection system monitoring plan in accordance with § 63.11552(c), and will operate each bag leak detection system according to the...
40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... tolerance of 1.27 centimeters of water or a transducer with a minimum tolerance of 1 percent of the pressure... use a fabric filter bag leak detection system to comply with the requirements of this subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as specified in...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...
40 CFR 61.354 - Monitoring of operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... or ±0.5 °C, whichever is greater. The temperature sensor shall be installed at a representative... greater. One temperature sensor shall be installed in the vent stream at the nearest feasible point to the catalyst bed inlet and a second temperature sensor shall be installed in the vent stream at the nearest...
40 CFR 61.354 - Monitoring of operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... or ±0.5 °C, whichever is greater. The temperature sensor shall be installed at a representative... greater. One temperature sensor shall be installed in the vent stream at the nearest feasible point to the catalyst bed inlet and a second temperature sensor shall be installed in the vent stream at the nearest...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Monitoring. 822.13 Section 822.13 Mineral... § 822.13 Monitoring. (a) A monitoring system shall be installed, maintained, and operated by the... until all bonds are released in accordance with Subchapter J of this chapter. The monitoring system...
Learn how to eliminate bias from monitoring systems by instituting appropriate installation, operation, and quality assurance procedures. Provides links to download An Operator's Guide to Eliminating Bias in CEM Systems.
40 CFR 63.564 - Monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator shall install, calibrate, maintain, and operate a flow indicator and data recorder. The flow... operate a flow indicator with either an audio or visual alarm. The flow indicator and alarm shall be...
40 CFR 63.564 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operator shall install, calibrate, maintain, and operate a flow indicator and data recorder. The flow... operate a flow indicator with either an audio or visual alarm. The flow indicator and alarm shall be...
40 CFR 63.564 - Monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operator shall install, calibrate, maintain, and operate a flow indicator and data recorder. The flow... operate a flow indicator with either an audio or visual alarm. The flow indicator and alarm shall be...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gallegos, Jonathan Michael
Balance Probe Monitors were designed, fabricated, installed, and evaluated at Sandia National Laboratories (SNL) for the 22,600 g kg (50,000 g lb) direct drive electromotor driven large centrifuges. These centrifuges provide a high onset/decay rate g environment. The Balance Probe Monitor is physically located near a centrifuge’s Capacitance Probe, a crucial sensor for the centrifuge’s sustainability. The Balance Probe Monitor will validate operability of the centrifuge. Most importantly, it is used for triggering a kill switch under the condition that the centrifuge displacement value exceeds allowed tolerances. During operational conditions, the Capacitance Probe continuously detects the structural displacement of themore » centrifuge and an adjoining AccuMeasure 9000 translates this displacement into an output voltage.« less
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2014 CFR
2014-07-01
... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... using a wet scrubber to comply with the emission limitations under § 60.2915, you must install... must include the date, time, and duration of the use of the bypass stack. (c) If you are using a method or air pollution control device other than a wet scrubber to comply with the emission limitations...
Experiences running NASTRAN on the Microvax 2 computer
NASA Technical Reports Server (NTRS)
Butler, Thomas G.; Mitchell, Reginald S.
1987-01-01
The MicroVAX operates NASTRAN so well that the only detectable difference in its operation compared to an 11/780 VAX is in the execution time. On the modest installation described here, the engineer has all of the tools he needs to do an excellent job of analysis. System configuration decisions, system sizing, preparation of the system disk, definition of user quotas, installation, monitoring of system errors, and operation policies are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
... source to install and operate monitoring systems and to record the resulting monitoring data. EPA... personal information provided, unless the comment includes profanity, threats, information claimed to be... (operating permits provisions) and Section 114 (enforcement provisions) of the CAA. Section 504(b) directs...
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1979-01-01
The design and development of marketable solar heating and cooling systems for single family and commercial applications is described. The delivery, installation, and monitoring of the prototype systems are discussed. Seven operational test sites are discussed in terms of system performance. Problems encountered with equipment and installation were usually due to lack of skills required for solar system installation.
Extending permanent volcano monitoring networks into Iceland's ice caps
NASA Astrophysics Data System (ADS)
Vogfjörd, Kristín S.; Bergsson, Bergur H.; Kjartansson, Vilhjálmur; Jónsson, Thorsteinn; Ófeigsson, Benedikt G.; Roberts, Matthew J.; Jóhannesson, Tómas; Pálsson, Finnur; Magnússon, Eyjólfur; Erlendsson, Pálmi; Ingvarsson, Thorgils; Pálssson, Sighvatur K.
2015-04-01
The goals of the FUTUREVOLC project are the establishment of a volcano Supersite in Iceland to enable access to volcanological data from the country's many volcanoes and the development of a multiparametric volcano monitoring and early warning system. However, the location of some of Iceland's most active volcanoes inside the country's largest ice cap, Vatnajökull, makes these goals difficult to achieve as it hinders access and proper monitoring of seismic and deformation signals from the volcanoes. To overcome these obstacles, one of the developments in the project involves experimenting with extending the permanent real-time networks into the ice cap, including installation of stations in the glacier ice. At the onset of the project, only one permanent seismic and GPS site existed within Vatnajökull, on the caldera rim of the Grímsvötn volcano. Two years into the project both seismic and GPS stations have been successfully installed and operated inside the glacier; on rock outcrops as well as on the glacier surface. The specific problems to overcome are (i) harsh weather conditions requiring sturdy and resilient equipment and site installations, (ii) darkness during winter months shutting down power generation for several weeks, (iii) high snow accumulation burying the instruments, solar panels and communication and GPS antennae, and in some locations (iv) extreme icing conditions blocking transmission signals and connection to GPS satellites, as well as excluding the possibility of power generation by wind generators. In 2013, two permanent seismic stations and one GPS station were installed on rock outcrops within the ice cap in locations with 3G connections and powered by solar panels and enough battery storage to sustain operation during the darkest winter months. These sites have successfully operated for over a year with mostly regular maintenance requirements, transmitting data in real-time to IMO for analysis. Preparations for two permanent seismic sites in the ice started in early 2014, with the installation of windmills, solar panels and web camera to monitor snow accumulation and icing. The site locations were constrained by the availability of communication and locations of ice-divides to avoid significant lateral motion of the stations. At the onset of the Bárdarbunga dyke intrusion in August 2014, these sites were temporarily instrumented and transmitted real-time seismic data, important for tracking the dyke intrusion. In late 2014, a specially designed vault was installed at one of the sites and a Güralp broadband glacier seismometer installed. Since 2013, three GPS stations powered by solar energy have been operated on the ice, to monitor the movement of the glacier during an expected subglacial flood, when accumulated melt water at the Eastern Skaftá cauldron sub-glacial geothermal area will drain. One of the sites, located in the depression above the subglacial lake to monitor the onset of the flood, transmits the data to a repeater just outside the depression, from where the signal is transmitted by 3G to IMO. Maintaining the transmission through the winter months has required considerable maintenance. The experience gained through this operation proved crucial for the successful installation and operation of a real-time transmitting GPS and strong motion seismometer inside the Bárdarbunga cauldron in October 2014 to monitor the ongoing caldera subsidence.
Code of Federal Regulations, 2010 CFR
2010-10-01
... equipment must be tested and inspected to verify their proper design, construction, installation, and operation. (d) All tests must be performed after installation of the automatic auxiliary boiler and its... monitored system conditions by misadjustment, artificial signals, improper wiring, tampering, or revision of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... concentration in the acid gas from the sweetening unit for each 24-hour period. At least one sample per 24-hour... sampling schedule. (3) The average acid gas flow rate from the sweetening unit. You must install and operate a monitoring device to continuously measure the flow rate of acid gas. The monitoring device...
Code of Federal Regulations, 2014 CFR
2014-07-01
... concentration in the acid gas from the sweetening unit for each 24-hour period. At least one sample per 24-hour... sampling schedule. (3) The average acid gas flow rate from the sweetening unit. You must install and operate a monitoring device to continuously measure the flow rate of acid gas. The monitoring device...
40 CFR 60.663 - Monitoring of emissions and operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the following equipment: (1) A temperature monitoring device equipped with a continuous recorder and having an accuracy of ±1 percent of the temperature being monitored expressed in degrees Celsius or ±0.5... temperature monitoring device shall be installed in the firebox. (ii) Where a catalytic incinerator is used...
40 CFR 60.663 - Monitoring of emissions and operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the following equipment: (1) A temperature monitoring device equipped with a continuous recorder and having an accuracy of ±1 percent of the temperature being monitored expressed in degrees Celsius or ±0.5... temperature monitoring device shall be installed in the firebox. (ii) Where a catalytic incinerator is used...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., wiring, power supply, and data acquisition and recording system that are compatible with the output... temperature CPMS that is used to monitor the combustion chamber temperature of a thermal oxidizer or the... where it is easily recognized by plant operating personnel. (6) For positive pressure fabric filter...
Code of Federal Regulations, 2013 CFR
2013-07-01
... CEMS must be installed at both the inlet and outlet of the control device. If you are meeting a requirement to limit the concentration of CO, the CEMS must be installed at the outlet of the control device... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If...
Lessons learned from hybrid wind/PV village power system installations in Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergey, M.
1995-09-01
In the last three years eight decentralized village power systems utilizing small wind turbines as the primary energy source have been installed in rural Mexico. Hybrid wind/PV systems have been installed in five States and by three vendors. Seven out of the eight systems, which range i size from 9.3--71.2kW in combined wind and PV capacity, utilize one or more 10 kW wind turbines. All of these installations have battery banks and use static inverters to provide AC power for distribution to homes, businesses, and community facilities. On all but one of the systems a diesel generator is used tomore » provide back-up power. This paper attempts to summarize the range of costs and economics, performance, and operational experiences for all eight installations. Several of the systems are monitored for performance, including one that is extensively monitored under a cooperative program between the Instituto de Investigaciones Electricas and Sandia National Laboratory. Lessons learned from these systems provide insights that may allow future village power systems of this architecture to be installed at lower costs, to be operated more effectively and efficiently, and to be better able to satisfy customer requirements.« less
A new environment for multiple spacecraft power subsystem mission operations
NASA Technical Reports Server (NTRS)
Bahrami, K. A.
1990-01-01
The engineering analysis subsystem environment (EASE) is being developed to enable fewer controllers to monitor and control power and other spacecraft engineering subsystems. The EASE prototype has been developed to support simultaneous real-time monitoring of several spacecraft engineering subsystems. It is being designed to assist with offline analysis of telemetry data to determine trends, and to help formulate uplink commands to the spacecraft. An early version of the EASE prototype has been installed in the JPL Space Flight Operations Facility for online testing. The EASE prototype is installed in the Galileo Mission Support Area. The underlying concept, development, and testing of the EASE prototype and how it will aid in the ground operations of spacecraft power subsystems are discussed.
Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meador, Richard J.; Hatley, Darrel D.
2004-03-18
Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less
Liquefied Petroleum Gas Monitoring System Based on Polystyrene Coated Long Period Grating
Zotti, Aldobenedetto; Palumbo, Giovanna; Zuppolini, Simona; Consales, Marco; Cutolo, Antonello; Borriello, Anna; Zarrelli, Mauro; Iadicicco, Agostino
2018-01-01
In this work, we report the in-field demonstration of a liquefied petroleum gas monitoring system based on optical fiber technology. Long-period grating coated with a thin layer of atactic polystyrene (aPS) was employed as a gas sensor, and an array comprising two different fiber Bragg gratings was set for the monitoring of environmental conditions such as temperature and humidity. A custom package was developed for the sensors, ensuring their suitable installation and operation in harsh conditions. The developed system was installed in a real railway location scenario (i.e., a southern Italian operative railway tunnel), and tests were performed to validate the system performances in operational mode. Daytime normal working operations of the railway line and controlled gas expositions, at very low concentrations, were the searched realistic conditions for an out-of-lab validation of the developed system. Encouraging results were obtained with a precise indication of the gas concentration and external conditioning of the sensor. PMID:29734731
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... galvanic corrosion. (c) For each integrating regeneration stream flow monitoring device associated with a... recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any...
Code of Federal Regulations, 2011 CFR
2011-07-01
... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilkerson, Andrea M.; Davis, Robert G.
The Yuma Sector Border Patrol Area is a high temperature and high solar radiation environment, providing an opportunity for the U.S. Department of Energy (DOE) to study thermal effects on outdoor light-emitting diode (LED) luminaires outside of the testing laboratory. Six LED luminaires were installed on three poles on the U.S.- Mexico border in February 2014 as part of a trial installation, which was detailed in a prior GATEWAY report.1 The initial trial installation was intended as a short - term test of six luminaires installed on three poles before proceeding with the complete installation of over 400 luminaires. Unexpectedmore » delays in the full installation have prevented the detailed evaluations initially planned, but the six installed LED luminaires continue to be monitored, and over the past year illuminance measurements were recorded initially in February 2014 and again in September 2014 at about 2500 hours of operation and in March 2015 at about 5000 hours of operation.« less
40 CFR 65.156 - General monitoring requirements for control and recovery devices.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process § 65.156 General monitoring requirements for... systems. (1) All monitoring equipment shall be installed, calibrated, maintained, and operated according...
40 CFR 63.127 - Transfer operations provisions-monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... device (including but not limited to a thermocouple, infrared sensor, or an ultra-violet beam sensor... temperature monitoring device equipped with a continuous recorder is required. (i) Where an incinerator other than a catalytic incinerator is used, a temperature monitoring device shall be installed in the firebox...
40 CFR 63.127 - Transfer operations provisions-monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... device (including but not limited to a thermocouple, infrared sensor, or an ultra-violet beam sensor... temperature monitoring device equipped with a continuous recorder is required. (i) Where an incinerator other than a catalytic incinerator is used, a temperature monitoring device shall be installed in the firebox...
40 CFR 63.127 - Transfer operations provisions-monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... device (including but not limited to a thermocouple, infrared sensor, or an ultra-violet beam sensor... temperature monitoring device equipped with a continuous recorder is required. (i) Where an incinerator other than a catalytic incinerator is used, a temperature monitoring device shall be installed in the firebox...
40 CFR 60.153 - Monitoring of operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) The owner or operator of any multiple hearth, fluidized bed, or electric sludge incinerator subject to...) Install, calibrate, maintain and operate temperature measuring devices at every hearth in multiple hearth... zones of electric incinerators. For multiple hearth furnaces, a minimum of one temperature measuring...
Code of Federal Regulations, 2011 CFR
2011-07-01
... opacity monitoring system and how are the data used? 60.1270 Section 60.1270 Protection of Environment... Continuous Emission Monitoring § 60.1270 What is required for my continuous opacity monitoring system and how... system. (b) Install, evaluate, and operate each continuous opacity monitoring system according to § 60.13...
40 CFR 63.11583 - What are my monitoring requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... preparation operation are in target HAP service: (a) Operate a bag leak detection system with alarm that will alert operators of a leak in the control device filter material. If a bag leak detection system with... install, calibrate, operate, and maintain each bag leak detection system and alarm according to...
Current and emerging laser sensors for greenhouse gas sensing and leak detection
NASA Astrophysics Data System (ADS)
Frish, Michael B.
2014-05-01
To reduce atmospheric accumulation of the greenhouse gases methane and carbon dioxide, networks of continuously operating sensors that monitor and map their sources are desirable. In this paper, we discuss advances in laser-based open-path leak detectors, as well as technical and economic challenges inhibiting widespread sensor deployment for "ubiquitous monitoring". We describe permanently-installed, wireless, solar-powered sensors that overcome previous installation and maintenance difficulties while providing autonomous real-time leak reporting without false alarms.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.
The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less
Emerging Technologies for Real-Time Continuous Monitoring of Wellbore Integrity
NASA Astrophysics Data System (ADS)
Freifeld, B. M.
2017-12-01
Assessment of a well's integrity has traditionally been carried out through periodic wireline logging, often performed only when an operational problem was noted at the surface. There are several emerging technologies that can be installed permanently as part of the well completion and offer the ability to monitor operations while providing continuous indicators to evaluate the structural health of a well. Permanent behind casing instrumentation, such as pressure and temperature gauges can monitor for behind casing leakage. Similarly, fiber-optic distributed temperature and acoustic sensing provide additional information for assessing unwanted movement of fluid, which is indicative of problems either inside or outside of casing. Furthermore, these technologies offer the benefit of providing real-time continuous streams of information that serve as leading-indicators of wellbore problems to allow for early intervention. Additional research is still needed to develop best practices for the installation and operation of these technologies, as they increase cost and add additional risks that must be managed.
40 CFR 75.11 - Specific provisions for monitoring SO2 emissions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... wood and 14.0% for natural gas (boilers, only); or (2) Install, operate, maintain, and quality assure a continuous moisture monitoring system for measuring and recording the moisture content of the flue gases, in... monitoring systems are acceptable: a continuous moisture sensor; an oxygen analyzer (or analyzers) capable of...
40 CFR 75.11 - Specific provisions for monitoring SO2 emissions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... wood and 14.0% for natural gas (boilers, only); or (2) Install, operate, maintain, and quality assure a continuous moisture monitoring system for measuring and recording the moisture content of the flue gases, in... monitoring systems are acceptable: a continuous moisture sensor; an oxygen analyzer (or analyzers) capable of...
The implementation of physical safety system in bunker of the electron beam accelerator
NASA Astrophysics Data System (ADS)
Ahmad, M. A.; Hashim, S. A.; Ahmad, A.; Leo, K. W.; Chulan, R. M.; Dalim, Y.; Baijan, A. H.; Zain, M. F.; Ros, R. C.
2017-01-01
This paper describes the implementation of physical safety system for the new low energy electron beam (EB) accelerator installed at Block 43T Nuclear Malaysia. The low energy EB is a locally designed and developed with a target energy of 300 keV. The issues on radiation protection have been addressed by the installation of radiation shielding in the form of a bunker and installation radiation monitors. Additional precaution is needed to ensure that personnel are not exposed to radiation and other physical hazards. Unintentional access to the radiation room can cause serious hazard and hence safety features must be installed to prevent such events. In this work we design and built a control and monitoring system for the shielding door. The system provides signals to the EB control panel to allow or prevent operation. The design includes limit switches, key-activated switches and emergency stop button and surveillance camera. Entry procedure is also developed as written record and for information purposes. As a result, through this safety implementation human error will be prevented, increase alertness during operation and minimizing unnecessary radiation exposure.
30 CFR 250.918 - What are the CVA's primary duties during the installation phase?
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Platforms and..., and review the towing records; (iii) Launching and uprighting operations; (iv) Submergence operations..., and when the independent monitoring activities were conducted; (2) Describe the CVA's activities...
40 CFR 63.11622 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2011 CFR
2011-07-01
....11621(e) to install and operate a cyclone to control emissions from pelleting operations, you must...) You must perform quarterly inspections of the cyclone for corrosion, erosion, or any other damage that...
40 CFR 63.11622 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2010 CFR
2010-07-01
....11621(e) to install and operate a cyclone to control emissions from pelleting operations, you must...) You must perform quarterly inspections of the cyclone for corrosion, erosion, or any other damage that...
Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Monogarov, A.; Taranenko, V.; Serov,A
The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less
Application research of Ganglia in Hadoop monitoring and management
NASA Astrophysics Data System (ADS)
Li, Gang; Ding, Jing; Zhou, Lixia; Yang, Yi; Liu, Lei; Wang, Xiaolei
2017-03-01
There are many applications of Hadoop System in the field of large data, cloud computing. The test bench of storage and application in seismic network at Earthquake Administration of Tianjin use with Hadoop system, which is used the open source software of Ganglia to operate and monitor. This paper reviews the function, installation and configuration process, application effect of operating and monitoring in Hadoop system of the Ganglia system. It briefly introduces the idea and effect of Nagios software monitoring Hadoop system. It is valuable for the industry in the monitoring system of cloud computing platform.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GREENE,G.A.; GUPPY,J.G.
1998-09-01
This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less
Operational management of offshore energy assets
NASA Astrophysics Data System (ADS)
Kolios, A. J.; Martinez Luengo, M.
2016-02-01
Energy assets and especially those deployed offshore are subject to a variety of harsh operational and environmental conditions which lead to deterioration of their performance and structural capacity over time. The aim of reduction of CAPEX in new installations shifts focus to operational management to monitor and assess performance of critical assets ensuring their fitness for service throughout their service life and also to provide appropriate and effective information towards requalification or other end of life scenarios, optimizing the OPEX. Over the last decades, the offshore oil & gas industry has developed and applied various approaches in operational management of assets through Structural Health and Condition Monitoring (SHM/CM) systems which can be, at a certain level, transferable to offshore renewable installations. This paper aims to highlight the key differences between offshore oil & gas and renewable energy assets from a structural integrity and reliability perspective, provide a comprehensive overview of different approaches that are available and applicable, and distinguish the benefits of such systems in the efficient operation of offshore energy assets.
Hydrologic Monitoring in the Deep Subsurface to Support Repository Performance
NASA Astrophysics Data System (ADS)
Hubbell, J. M.; Heath, G. L.; Scott, C. L.
2007-12-01
The INL has installed and operated several vadose and ground water monitoring systems in arid and humid sites to depths of about 200m. Some of these systems have been in continuous operation for over 12 years. It is important that the systems be physically robust, simple, yet versatile enough that it can operate for extended time periods with little or no maintenance. Monitoring instruments are frequently installed and run to characterize the site, collect data during site operation, and continue to run for long-term stewardship, necessitating sensors that can be maintained or serviced. Sensors are carefully chosen based on the perceived data requirements over the life of the site. An emphasis is given on direct measurements such as tensiometers (portable and advanced), neutron probe, drain gauge, temperature, wells or sampling for fluids and gases. Other complementary data can include using TDR/capacitance, radiation detectors, and larger scale geophysical techniques (3-d resistivity and EM) for volumetric measurements. Commercially available instruments may have to be modified for their use at greater depths, to allow multiple instruments in a single borehole or to perform the intended monitoring function. Access tubes (some open at the bottom) can be placed to allow insertion of multiple sensors (radiation, neutron and portable sensors/samplers), future drilling/sampling and to install new instruments at a later time. The installation techniques and backfill materials must be chosen and the measurement technique tested to ensure representative data collection for the parameters of interest. The data collection system can be linked to climatic data (precipitation, barometric pressure, snow depth, runoff, surface water sources) that may influence the site's subsurface hydrology. The instruments are then connected to a real-time automated data collection system that collect, stores, and provides access to the data. These systems have been developed that allow easy access, automatic data quality checks with notification, processing, and presentation of the data in real time through the web. The systems can be designed to manipulate/test the system remotely. Data from several sites will be presented showing that continuous monitoring is necessary to detect rapid changes in the deep vadose zone and ground water at fractured rock sites.
Code of Federal Regulations, 2014 CFR
2014-07-01
... add-on control device, you must monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and cooling... regeneration desorbing gas mass flow monitor must be an integrating device having a measurement sensitivity of...
40 CFR 60.1230 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2010 CFR
2010-07-01
... systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I... sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the outlet of the air pollution... according to the “Monitoring Requirements” in § 60.13. (c) You must monitor the oxygen (or carbon dioxide...
40 CFR 60.1230 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2011 CFR
2011-07-01
... systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I... sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the outlet of the air pollution... according to the “Monitoring Requirements” in § 60.13. (c) You must monitor the oxygen (or carbon dioxide...
Solar energy system performance evaluation: Seasonal report for fern, Tunkhannock, Pennsylvania
NASA Technical Reports Server (NTRS)
1980-01-01
The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is reported, and technical contributions to the definition of techniques and requirements for solar energy system design are made. The solar energy system was designed to supply space heating and domestic hot water for single-family residences. The system consists of air flat plate collectors, storage tank, pumps, heat exchangers, associated plumbing, and controls.
Solar energy system performance evaluation: Seasonal report for SEMCO, Loxahatchee, Florida
NASA Technical Reports Server (NTRS)
1980-01-01
The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis used is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system and the technical contributions to the definition of techniques and requirements solar energy system design are analyzed. The solar energy system was designed to supply domestic hot water for a family of four, single-family residences. It consists of two liquid flat plate collectors, single tank, controls, and transport lines.
Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dodson, Guy; Pero, Vincent
Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation ofmore » boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.« less
40 CFR 63.605 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) National Emission Standards for Hazardous Air Pollutants From Phosphoric Acid Manufacturing Plants § 63.605 Monitoring requirements. (a)(1) Each owner or operator of a new or existing wet-process phosphoric acid process line or superphosphoric acid process line subject to the provisions of this subpart shall install...
78 FR 42547 - Notice of Lodging of Proposed Consent Decree Under the Clean Air Act
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-16
... flared, Shell will operate numerous monitoring systems and comply with several operating parameters to... compounds (``VOCs''), and hazardous air pollutants from the twelve flares it operates at its Deer Park facility. Shell has agreed to limit the waste gas it sends to its flares by installing and/or operating...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fitzgerald, Peter; Laughter, Mark D; Martyn, Rose
The Cylinder Accountability and Tracking System (CATS) is a tool designed for use by the International Atomic Energy Agency (IAEA) to improve overall inspector efficiency through real-time unattended monitoring of cylinder movements, site specific rules-based event detection, and the capability to integrate many types of monitoring technologies. The system is based on the tracking of cylinder movements using (radio frequency) RF tags, and the collection of data, such as accountability weights, that can be associated with the cylinders. This presentation will cover the installation and evaluation of the CATS at the Global Nuclear Fuels (GNF) fuel fabrication facility in Wilmington,more » NC. This system was installed to evaluate its safeguards applicability, operational durability under operating conditions, and overall performance. An overview of the system design and elements specific to the GNF deployment will be presented along with lessons learned from the installation process and results from the field trial.« less
NASA Astrophysics Data System (ADS)
Nybade, A.; Aster, R.; Beck, S.; Ekstrom, G.; Fischer, K.; Lerner-Lam, A.; Meltzer, A.; Sandvol, E.; Willemann, R. J.
2008-12-01
Building a sustainable earthquake monitoring system requires well-informed cooperation between commercial companies that manufacture components or deliver complete systems and the government or other agencies that will be responsible for operating them. Many nations or regions with significant earthquake hazard lack the financial, technical, and human resources to establish and sustain permanent observatory networks required to return the data needed for hazard mitigation. Government agencies may not be well- informed about the short-term and long-term challenges of managing technologically advanced monitoring systems, much less the details of how they are built and operated. On the relatively compressed time scale of disaster recovery efforts, it can be difficult to find a reliable, disinterested source of information, without which government agencies may be dependent on partial information. If system delivery fails to include sufficient development of indigenous expertise, the performance of local and regional networks may decline quickly, and even data collected during an early high-performance period may be degraded or lost. Drawing on unsurpassed educational capabilities of its members working in close cooperation with its facility staff, IRIS is well prepared to contribute to sustainability through a wide variety of training and service activities that further promote standards for network installation, data exchange protocols, and free and open access to data. Members of the Consortium and staff of its Core Programs together could write a guide on decisions about network design, installation and operation. The intended primary audience would be government officials seeking to understand system requirements, the acquisition and installation process, and the expertise needed operate a system. The guide would cover network design, procurement, set-up, data use and archiving. Chapters could include advice on network data processing, archiving data (including information on the value of standards), installing and servicing stations, building a data processing and management center (including information on evaluating bids), using results from earthquake monitoring, and sustaining an earthquake monitoring system. Appendices might include profiles of well-configured and well- run networks and sample RFPs. Establishing permanent networks could provide a foundation for international research and educational collaborations and critical new data for imaging Earth structure while supporting scientific capacity building and strengthening hazard monitoring around the globe.
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.
2017-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.
Trigger Menu-aware Monitoring for the ATLAS experiment
NASA Astrophysics Data System (ADS)
Hoad, Xanthe; ATLAS Collaboration
2017-10-01
We present a“trigger menu-aware” monitoring system designed for the Run-2 data-taking of the ATLAS experiment at the LHC. Unlike Run-1, where a change in the trigger menu had to be matched by the installation of a new software release at Tier-0, the new monitoring system aims to simplify the ATLAS operational workflows. This is achieved by integrating monitoring updates in a quick and flexible manner via an Oracle DB interface. We present the design and the implementation of the menu-aware monitoring, along with lessons from the operational experience of the new system with the 2016 collision data.
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
Todd, Victoria Louise Georgia; Warley, Jane Clare; Todd, Ian Boyer
2016-01-01
A decade of visual and acoustic detections of marine megafauna around offshore Oil & Gas (O&G) installations in the North and Irish Seas are presented. Marine megafauna activity was monitored visually and acoustically by Joint Nature Conservation Committee (JNCC) qualified and experienced Marine Mammal Observers (MMO) and Passive Acoustic Monitoring (PAM) Operators respectively, with real-time towed PAM in combination with industry standard software, PAMGuard. Monitoring was performed during routine O&G industrial operations for underwater noise mitigation purposes, and to ensure adherence to regulatory guidelines. Incidental sightings by off-effort MMOs and installation crew were also reported. Visual and acoustic monitoring spanned 55 non-consecutive days between 2004 and 2014. A total of 47 marine mammal sightings were recorded by MMOs on dedicated watch, and 10 incidental sightings of marine megafauna were reported over 10 years. Species included: harbour porpoise (Phocoena phocoena), Atlantic white-sided dolphin (Lagenorhynchus acutus), white beaked dolphin (Lagenorhynchus albirostris), common dolphin (Delphinus delphis), minke whale (Balaenoptera acutorostrata), common seal (Phoca vitulina), grey seal (Halichoerus grypus) and, basking shark (Cetorhinus maximus). Passive Acoustic Monitoring was conducted on two occasions in 2014; 160 PAM hours over 12 days recorded a total of 308 individual clicks identified as harbour porpoises. These appear to be the first such acoustic detections obtained from a North Sea drilling rig whilst using a typically configured hydrophone array designed for towing in combination with real-time PAMGuard software. This study provides evidence that marine megafauna are present around mobile and stationary offshore O&G installations during routine operational activities. On this basis, Environmental Impact Assessments (EIAs) for decommissioning O&G platforms should be carried-out on a case-by-case basis, and must include provisions for hitherto overlooked marine megafauna.
Code of Federal Regulations, 2012 CFR
2012-07-01
... adsorber as an add-on control device, you must monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and... regeneration desorbing gas mass flow monitor must be an integrating device having an accuracy of ±10 percent...
Code of Federal Regulations, 2013 CFR
2013-07-01
... adsorber as an add-on control device, you must monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and... regeneration desorbing gas mass flow monitor must be an integrating device having an accuracy of ±10 percent...
Code of Federal Regulations, 2014 CFR
2014-07-01
... adsorber as an add-on control device, you must monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and... regeneration desorbing gas mass flow monitor must be an integrating device having an accuracy of ±10 percent...
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2013 CFR
2013-07-01
...; and (2) Install and maintain CPMS to measure and record the pH of the scrubber blowdown according to the requirements in paragraph (e)(2)(i) through (iv) of this section. (i) Locate the pH sensor in a position that provides a representative measurement of the pH and that minimizes or eliminates internal and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... specifications and in accordance with § 63.6(e)(1). (b) Each CEMS must complete a minimum of one cycle of... cycles of operation in a 1-hour period to have a valid hour of data. (c) The CEMS data must be reduced to... water (0.05 percent, 0.15 percent, and 0.3 percent). (2) For use in calibrating the GC, prepare the...
40 CFR 63.1565 - What are my requirements for organic HAP emissions from catalytic cracking units?
Code of Federal Regulations, 2010 CFR
2010-07-01
... according to the procedures in the plan. (4) The emission limitations and operating limits for organic HAP... work practice standards? You must: (1) Install, operate, and maintain a continuous monitoring system... operating limit in Table 9 of this subpart that applies to you according to the procedures in Table 11 of...
40 CFR 63.1565 - What are my requirements for organic HAP emissions from catalytic cracking units?
Code of Federal Regulations, 2011 CFR
2011-07-01
... according to the procedures in the plan. (4) The emission limitations and operating limits for organic HAP... work practice standards? You must: (1) Install, operate, and maintain a continuous monitoring system... operating limit in Table 9 of this subpart that applies to you according to the procedures in Table 11 of...
Code of Federal Regulations, 2010 CFR
2010-07-01
...-accuracy test PS 8 requires. (3) If you continuously monitor VOC emissions using gas chromatography, you... percent of the span value (or more than 10 percent of the calibration gas value if your CEMS is a gas... calibration drift exceeds 5 percent of the span value (or more than 20 percent of the calibration gas value...
Code of Federal Regulations, 2011 CFR
2011-07-01
...-accuracy test PS 8 requires. (3) If you continuously monitor VOC emissions using gas chromatography, you... percent of the span value (or more than 10 percent of the calibration gas value if your CEMS is a gas... calibration drift exceeds 5 percent of the span value (or more than 20 percent of the calibration gas value...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How do I monitor the temperature of... I monitor the temperature of flue gases at the inlet of my particulate matter control device? You must install, calibrate, maintain, and operate a device to continuously measure the temperature of the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How do I monitor the temperature of... I monitor the temperature of flue gases at the inlet of my particulate matter control device? You must install, calibrate, maintain, and operate a device to continuously measure the temperature of the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How do I monitor the temperature of... I monitor the temperature of flue gases at the inlet of my particulate matter control device? You must install, calibrate, maintain, and operate a device to continuously measure the temperature of the...
40 CFR 63.5994 - How do I conduct tests and procedures for tire production affected sources?
Code of Federal Regulations, 2014 CFR
2014-07-01
... oxidizer, monitor the firebox secondary chamber temperature. (ii) If you use a carbon adsorber, monitor the total regeneration stream mass or volumetric flow for each regeneration cycle, and the carbon bed... control device other than a thermal oxidizer or a regenerative carbon adsorber, install and operate a...
Continuous turbidity monitoring in streams of northwestern California
Rand Eads; Jack Lewis
2002-01-01
Abstract - Redwood Sciences Laboratory, a field office of the USDA Forest Service, Pacific Southwest Research Station has developed and refined methods and instrumentation to monitor turbidity and suspended sediment in streams of northern California since 1996. Currently we operate 21 stations and have provided assistance in the installation of 6 gaging stations for...
Earnest, G Scott; Ewers, Lynda M; Ruder, Avima M; Petersen, Martin R; Kovein, Ronald J
2002-02-01
Real-time monitoring was used to evaluate the ability of engineering control devices retrofitted on two existing dry-cleaning machines to reduce worker exposures to perchloroethylene. In one dry-cleaning shop, a refrigerated condenser was installed on a machine that had a water-cooled condenser to reduce the air temperature, improve vapor recovery, and lower exposures. In a second shop, a carbon adsorber was retrofitted on a machine to adsorb residual perchloroethylene not collected by the existing refrigerated condenser to improve vapor recovery and reduce exposures. Both controls were successful at reducing the perchloroethylene exposures of the dry-cleaning machine operator. Real-time monitoring was performed to evaluate how the engineering controls affected exposures during loading and unloading the dry-cleaning machine, a task generally considered to account for the highest exposures. The real-time monitoring showed that dramatic reductions occurred in exposures during loading and unloading of the dry-cleaning machine due to the engineering controls. Peak operator exposures during loading and unloading were reduced by 60 percent in the shop that had a refrigerated condenser installed on the dry-cleaning machine and 92 percent in the shop that had a carbon adsorber installed. Although loading and unloading exposures were dramatically reduced, drops in full-shift time-weighted average (TWA) exposures were less dramatic. TWA exposures to perchloroethylene, as measured by conventional air sampling, showed smaller reductions in operator exposures of 28 percent or less. Differences between exposure results from real-time and conventional air sampling very likely resulted from other uncontrolled sources of exposure, differences in shop general ventilation before and after the control was installed, relatively small sample sizes, and experimental variability inherent in field research. Although there were some difficulties and complications with installation and maintenance of the engineering controls, this study showed that retrofitting engineering controls may be a feasible option for some dry-cleaning shop owners to reduce worker exposures to perchloroethylene. By installing retrofit controls, a dry-cleaning facility can reduce exposures, in some cases dramatically, and bring operators into compliance with the Occupational Safety and Health Administration (OSHA) peak exposure limit of 300 ppm. Retrofit engineering controls are also likely to enable many dry-cleaning workers to lower their overall personal TWA exposures to perchloroethylene.
NASA Technical Reports Server (NTRS)
1978-01-01
A description is given of the Installation, Operation, and Maintenance Manual and information on the power panel and programmable microprocessor, a hydronic solar pump system and a hydronic heating hot water pumping system. These systems are integrated into various configurations for usages in solar energy management, control and monitoring, lighting control, data logging and other solar related applications.
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
30 CFR 250.918 - What are the CVA's primary duties during the installation phase?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF... location, and review the towing records; (iii) Launching and uprighting operations; (iv) Submergence..., and when the independent monitoring activities were conducted; (2) Describe the CVA's activities...
30 CFR 250.918 - What are the CVA's primary duties during the installation phase?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER... specified location, and review the towing records; (iii) Launching and uprighting operations; (iv..., and when the independent monitoring activities were conducted; (2) Describe the CVA's activities...
30 CFR 250.918 - What are the CVA's primary duties during the installation phase?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF... location, and review the towing records; (iii) Launching and uprighting operations; (iv) Submergence..., and when the independent monitoring activities were conducted; (2) Describe the CVA's activities...
30 CFR 250.918 - What are the CVA's primary duties during the installation phase?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF... location, and review the towing records; (iii) Launching and uprighting operations; (iv) Submergence..., and when the independent monitoring activities were conducted; (2) Describe the CVA's activities...
Operational experience at a "dog-hair" site.
Stephen R. Ricketts; Richard E. Miller
1995-01-01
To monitor consequences of past operational practices, we installed eight 0.05-acre plots in a 9-year-old Douglas-fir (Pseudotsuga menziesii (Mirb.) Franco var. menziesii) plantation established after clearcutting a grossly overstocked stand on a poor-quality site. Logging slash was broadcast burned on half this clearcut. One...
40 CFR 63.7831 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2011 CFR
2011-07-01
... procedures you will follow in the event a venturi scrubber exceeds the operating limit in § 63.7790(b)(2... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...
40 CFR 63.7831 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2010 CFR
2010-07-01
... procedures you will follow in the event a venturi scrubber exceeds the operating limit in § 63.7790(b)(2... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...
40 CFR 63.7831 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2014 CFR
2014-07-01
... procedures you will follow in the event a venturi scrubber exceeds the operating limit in § 63.7790(b)(2... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...
40 CFR 63.7831 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2013 CFR
2013-07-01
... procedures you will follow in the event a venturi scrubber exceeds the operating limit in § 63.7790(b)(2... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...
40 CFR 63.7831 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2012 CFR
2012-07-01
... procedures you will follow in the event a venturi scrubber exceeds the operating limit in § 63.7790(b)(2... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...
40 CFR 142.307 - What terms and conditions must be included in a small system variance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... that may affect proper and effective operation and maintenance of the technology; (2) Monitoring... effective installation, operation and maintenance of the applicable small system variance technology in... health, which may include: (i) Public education requirements; and (ii) Source water protection...
NASA Astrophysics Data System (ADS)
Azarbayejani, M.; Jalalpour, M.; El-Osery, A. I.; Reda Taha, M. M.
2011-08-01
In this paper, an innovative field application of a structural health monitoring (SHM) system using field programmable gate array (FPGA) technology and wireless communication is presented. The new SHM system was installed to monitor a reinforced concrete (RC) bridge on Interstate 40 (I-40) in Tucumcari, New Mexico. This newly installed system allows continuous remote monitoring of this bridge using solar power. Details of the SHM component design and installation are discussed. The integration of FPGA and solar power technologies make it possible to remotely monitor infrastructure with limited access to power. Furthermore, the use of FPGA technology enables smart monitoring where data communication takes place on-need (when damage warning signs are met) and on-demand for periodic monitoring of the bridge. Such a system enables a significant cut in communication cost and power demands which are two challenges during SHM operation. Finally, a three-dimensional finite element (FE) model of the bridge was developed and calibrated using a static loading field test. This model is then used for simulating damage occurrence on the bridge. Using the proposed automation process for SHM will reduce human intervention significantly and can save millions of dollars currently spent on prescheduled inspection of critical infrastructure worldwide.
Using Advanced Tensiometers to Monitor Temporal Variations in Pore Pressure
NASA Astrophysics Data System (ADS)
Nichols, R. L.; Young, M. H.; Dixon, K. L.; Rossabi, J.; Hyde, W. K.; Holmes-Burns, H.
2002-12-01
The Savannah River Site has installed a comprehensive vadose zone monitoring system (VZMS) at it's low level radioactive waste disposal facility to collect the necessary information to calculate contaminant flux. The VZMS includes water content reflectometers, suction lysimeters, advanced tensiometers (ATs), water flux meters, access ports for neutron probes, and a tipping bucket rain gauge. Forty one ATs were installed from 1999 to 2001 at depths ranging from 2 to 60 feet and have been operated continuously. The installation depths were based on a hydrostatigraphic model developed from core logs, cone penetrometer logs, moisture content profiles, water retention curves model that were obtained during the phased installation of the VZMS. An AT consists of a porous cup installed at a prescribed depth with casing back to the surface and a pressure transducer that is lowered into the casing and connects with the porous cup. The pressure transducer transmits it's signal to a datalogger where the data is stored for future retrieval using a cellular phone communications package. Results from the 2 year operating period show that the AT calibrations are stable and t ATs are capable of extended monitoring of pore pressures in the 0 to 300 cm H2 O range. The ATs had sufficient resolution to detect the naturally occurring fluctuations in pore pressure (1 to 100 cm H2 O over 1 to 72 hours) that resulted from infiltration events at the site. The stable performance of the ATs combined with their ability to detect naturally occurring fluctuations in pore pressure make the ATs a useful tool in measuring temporal pore pressure variations for use in calibrating numerical models of fluid flow in variably saturated porous media.
40 CFR 63.5998 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards for Hazardous Air Pollutants: Rubber Tire Manufacturing Testing and Initial Compliance Requirements for Tire Cord Production Affected Sources § 63.5998...
Vibration Tests on Transit Buses
DOT National Transportation Integrated Search
1979-03-01
The objective of this vibration measurement program was to quantify the vibration environment which would be experienced by Automatic Vehicle Monitoring (AVM) equipment when installed on buses during typical city route service operations. Two buses w...
Low-cost measurement and monitoring system for cryogenic applications
NASA Astrophysics Data System (ADS)
Tubío Araújo, Óscar; Hernández Suárez, Elvio; Gracia Temich, Félix
2016-07-01
Cryostats are closed chambers that hinder the monitoring of materials, structures or systems installed therein. This paper presents a webcam-based measurement and monitoring system, which can operate under vacuum and cryogenic conditions to be mainly used in astrophysical applications. The system can be configured in two different assemblies: wide field that can be used for mechanism monitoring and narrow field, especially useful in cryogenic precision measurements with a resolution up to 4 microns/pixel.
Civionics specifications for fiber optic sensors for structural health monitoring
NASA Astrophysics Data System (ADS)
Rivera, Evangeline; Mufti, Aftab A.; Thomson, Douglas J.
2004-07-01
As the design and construction of civil structures continue to evolve, it is becoming imperative that these structures be monitored for their health. In order to meet this need, the discipline of Civionics has emerged. It involves the applications to civil structures and aims to assist engineers in realizing the full benefits of structural health monitoring (SHM). Therefore, the goal of the specification outlined in this work is to ensure that correct installation and operating of fiber optic sensors, such as bridges, will be discussed that motivated the writing of these specifications. The main reason for the failure of FOS based monitoring systems can be traced directly to the installation of the fiber sensor itself. Therefore, by creating a standard procedure for SHM, several ambiguities are eliminated such as fiber sensor specifications and the types of cables required. As a result, these specifications will help ensure that the sensors will survive the installation process and eventually prove their value over years of monitoring the health of the structure. The Civionics FOS specifications include the requirements for fiber sensors, specifically Bragg grating sensors, and their corresponding readout unit. It also includes specifications on the cables, conduits, junction boxes, cable termination and the environmental.
46 CFR 27.203 - What are the requirements for fire detection on towing vessels?
Code of Federal Regulations, 2010 CFR
2010-10-01
... detection on towing vessels? You must have a fire-detection system installed on your vessel to detect engine... use an existing engine-room-monitoring system (with fire-detection capability) instead of a fire-detection system, if the monitoring system is operable and complies with this section. You must ensure that...
Code of Federal Regulations, 2011 CFR
2011-07-01
... oxidizer, monitor the firebox secondary chamber temperature. (ii) If you use a carbon adsorber, monitor the total regeneration stream mass or volumetric flow for each regeneration cycle, and the carbon bed... control device used other than a thermal oxidizer or a regenerative carbon adsorber, install and operate a...
Code of Federal Regulations, 2010 CFR
2010-07-01
... oxidizer, monitor the firebox secondary chamber temperature. (ii) If you use a carbon adsorber, monitor the total regeneration stream mass or volumetric flow for each regeneration cycle, and the carbon bed... control device used other than a thermal oxidizer or a regenerative carbon adsorber, install and operate a...
Code of Federal Regulations, 2013 CFR
2013-07-01
... monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and cooling cycle, and comply with paragraphs (a)(3) through (5) and (d)(1) and (2) of this section. (1) The regeneration desorbing gas mass flow...
Code of Federal Regulations, 2012 CFR
2012-07-01
... regenerative carbon adsorber as an add-on control device, you must monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and cooling cycle, and comply with paragraphs (a)(3) through (5) and (d)(1) and (2...
Code of Federal Regulations, 2014 CFR
2014-07-01
... monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and cooling cycle, and comply with paragraphs (a)(3) through (5) and (d)(1) and (2) of this section. (1) The regeneration desorbing gas mass flow...
Code of Federal Regulations, 2012 CFR
2012-07-01
... monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and cooling cycle, and comply with paragraphs (a)(3) through (5) and (d)(1) and (2) of this section. (1) The regeneration desorbing gas mass flow...
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... control device, you must monitor on a continuous basis your catalyst inlet temperature in order to comply... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... control device, you must monitor on a continuous basis your catalyst inlet temperature in order to comply... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The development of eight prototype solar heating and combined heating and cooling systems is reported. Manufacture, test, installation, maintenance, problem resolution, and monitoring the operation of prototype systems is included. Heating and cooling equipment for single family residential and commercial applications and eight operational test sites (four heating and four heating and cooling) is described.
40 CFR 60.13 - Monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once each operating day in accordance with a written procedure. The zero and span must, at a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift...
NASA Technical Reports Server (NTRS)
1990-01-01
Hedland Flow Meters manufactures a complete line of flow meters used in industrial operations to monitor the flow of oil, water or other liquids, air and other compressed gases, including caustics or corrosive liquids/gases. The company produces more than 1,000 types of flow meters featuring rugged construction, simplicity of installation and the ability to operate in any position.
Five Years of Cyclotron Radioisotope Production Experiences at the First PET-CT in Venezuela
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colmenter, L.; Coelho, D.; Esteves, L. M.
2007-10-26
Five years operation of a compact cyclotron installed at PET-CT facility in Caracas, Venezuela is given. Production rate of {sup 18}F labeled FDG, operation and radiation monitoring experience are included. We conclude that {sup 18}FDG CT-PET is the most effective technique for patient diagnosis.
40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... audit, and an annual zero alignment audit of each COMS. (6) You must operate and maintain each COMS... assessment, a quarterly performance audit, or an annual zero alignment audit. (7) You must determine and... control activities (including, as applicable, calibration checks and required zero and span adjustments...
40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... audit, and an annual zero alignment audit of each COMS. (6) You must operate and maintain each COMS... assessment, a quarterly performance audit, or an annual zero alignment audit. (7) You must determine and... control activities (including, as applicable, calibration checks and required zero and span adjustments...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-04
... an immediate closure of the California thresher shark/swordfish drift gillnet (mesh size >=14 inches.../operators of vessels intending to fish with DGN gear will be required to install, activate, carry and.... Implementation Vessel Monitoring System Owners/operators of vessels intending to fish with large-mesh DGN gear...
NASA Astrophysics Data System (ADS)
Scanu, Sergio; Peviani, Maximo; Carli, Filippo Maria; Paladini de Mendoza, Francesco; Piermattei, Viviana; Bonamano, Simone; Marcelli, Marco
2015-04-01
This work proposes a multidisciplinary approach in which wave power potential maps are used as baseline for the application of environmental monitoring techniques identified through the use of a Database for Environmental Monitoring Techniques and Equipment (DEMTE), derived in the frame of the project "Marine Renewables Infrastructure Network for Emerging Energy Technologies" (Marinet - FP7). This approach aims to standardize the monitoring of the marine environment in the event of installation, operation and decommissioning of Marine Energy Conversion Systems. The database has been obtained through the collection of techniques and instrumentation available among the partners of the consortium, in relation with all environmental marine compounds potentially affected by any impacts. Furthermore in order to plan marine energy conversion schemes, the wave potential was assessed at regional and local scales using the numerical modelling downscaling methodology. The regional scale lead to the elaboration of the Italian Wave Power Atlas, while the local scale lead to the definition of nearshore hot spots useful for the planning of devices installation along the Latium coast. The present work focus in the application of environmental monitoring techniques identified in the DEMTE, in correspondence of the hotspot derived from the wave potential maps with particular reference to the biological interaction of the devices and the management of the marine space. The obtained results are the bases for the development of standardized procedures which aims to an effective application of marine environmental monitoring techniques during the installation, operation and decommissioning of Marine Energy Conversion Systems. The present work gives a consistent contribution to overcome non-technological barriers in the concession procedures, as far as the protection of the marine environment is of concern.
NASA Technical Reports Server (NTRS)
Douard, Stephane
1994-01-01
Known as a Graphic Server, the system presented was designed for the control ground segment of the Telecom 2 satellites. It is a tool used to dynamically display telemetry data within graphic pages, also known as views. The views are created off-line through various utilities and then, on the operator's request, displayed and animated in real time as data is received. The system was designed as an independent component, and is installed in different Telecom 2 operational control centers. It enables operators to monitor changes in the platform and satellite payloads in real time. It has been in operation since December 1991.
NASA Astrophysics Data System (ADS)
Faustov, A.; Gussarov, A.; Wuilpart, M.; Fotiadi, A. A.; Liokumovich, L. B.; Kotov, O. I.; Zolotovskiy, I. O.; Tomashuk, A. L.; Deschoutheete, T.; Mégret, P.
2012-04-01
On-line monitoring of environmental conditions in nuclear facilities is becoming a more and more important problem. Standard electronic sensors are not the ideal solution due to radiation sensitivity and difficulties in installation of multiple sensors. In contrast, radiation-hard optical fibres can sustain very high radiation doses and also naturally offer multi-point or distributed monitoring of external perturbations. Multiple local electro-mechanical sensors can be replaced by just one measuring fibre. At present, there are over four hundred operational nuclear power plants (NPPs) in the world 1. Operating experience has shown that ineffective control of the ageing degradation of major NPP components can threaten plant safety and also plant life. Among those elements, cables are vital components of I&C systems in NPPs. To ensure their safe operation and predict remaining life, environmental monitoring is necessary. In particular, temperature and radiation dose are considered to be the two most important parameters. The aim of this paper is to assess experimentally the feasibility of optical fibre temperature measurements in a low doserate radiation environment, using a commercially available reflectometer based on Rayleigh backscattering. Four different fibres were installed in the Sub-Pile Room of the BR2 Material testing nuclear reactor in Mol, Belgium. This place is man-accessible during the reactor shut-down, allowing easy fibre installation. When the reactor operates, the dose-rates in the room are in a range 0.005-5 Gy/h with temperatures of 40-60 °C, depending on the location. Such a surrounding is not much different to some "hot" environments in NPPs, where I&C cables are located.
Flood monitoring network in southeastern Louisiana
McCallum, Brian E.
1994-01-01
A flood monitoring network has been established to alert emergency operations personnel and the public about hydrologic conditions in the Amite River Basin. The U.S. Geological Survey (USGS), in cooperation with the Louisiana Office of Emergency Preparedness (LOEP), has installed a real-time data acquisition system to monitor rainfall and river stages in the basin. These data will be transmitted for use by emergency operations personnel to develop flood control and evacuation strategies. The current river stages at selected gaging stations in the basin also will be broadcast by local television and radio stations during a flood. Residents can record the changing river stages on a basin monitoring map, similar to a hurricane tracking map.
The Gas Monitoring of the Besiii Drift Chamber
NASA Astrophysics Data System (ADS)
Wang, Xianggao; Chen, Chang; Chen, Yuanbo; Wu, Zhi; Gu, Yunting; Ma, Xiaoyan; Jin, Yan; Liu, Rongguang; Tang, Xiao; Wang, Lan; Zhu, Qiming
Two monitoring proportional counters (MPCs), installed at the inlet and outlet of the gas system of BESIII drift chamber (DC), were used to monitor the operation of the BESIII DC successfully and effectively as reported in this paper. The ratio of Gout/Gin (full energy photoelectron peak position of 55Fe 5.9 keV X-ray in inlet MPC as Gin and outlet MPC as Gout) is used as the main monitoring parameter. The MPC method is very useful for the gas detector system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
47 CFR 11.35 - Equipment operational readiness.
Code of Federal Regulations, 2010 CFR
2010-10-01
... part of the EAS are installed so that the monitoring and transmitting functions are available during... cause of any failure to receive the required tests or activations specified in § 11.61(a)(1) and (a)(2...
47 CFR 11.35 - Equipment operational readiness.
Code of Federal Regulations, 2011 CFR
2011-10-01
... part of the EAS are installed so that the monitoring and transmitting functions are available during... cause of any failure to receive the required tests or activations specified in § 11.61(a)(1) and (a)(2...
Todd, Victoria Louise Georgia; Todd, Ian Boyer
2016-01-01
A decade of visual and acoustic detections of marine megafauna around offshore Oil & Gas (O&G) installations in the North and Irish Seas are presented. Marine megafauna activity was monitored visually and acoustically by Joint Nature Conservation Committee (JNCC) qualified and experienced Marine Mammal Observers (MMO) and Passive Acoustic Monitoring (PAM) Operators respectively, with real-time towed PAM in combination with industry standard software, PAMGuard. Monitoring was performed during routine O&G industrial operations for underwater noise mitigation purposes, and to ensure adherence to regulatory guidelines. Incidental sightings by off-effort MMOs and installation crew were also reported. Visual and acoustic monitoring spanned 55 non-consecutive days between 2004 and 2014. A total of 47 marine mammal sightings were recorded by MMOs on dedicated watch, and 10 incidental sightings of marine megafauna were reported over 10 years. Species included: harbour porpoise (Phocoena phocoena), Atlantic white-sided dolphin (Lagenorhynchus acutus), white beaked dolphin (Lagenorhynchus albirostris), common dolphin (Delphinus delphis), minke whale (Balaenoptera acutorostrata), common seal (Phoca vitulina), grey seal (Halichoerus grypus) and, basking shark (Cetorhinus maximus). Passive Acoustic Monitoring was conducted on two occasions in 2014; 160 PAM hours over 12 days recorded a total of 308 individual clicks identified as harbour porpoises. These appear to be the first such acoustic detections obtained from a North Sea drilling rig whilst using a typically configured hydrophone array designed for towing in combination with real-time PAMGuard software. This study provides evidence that marine megafauna are present around mobile and stationary offshore O&G installations during routine operational activities. On this basis, Environmental Impact Assessments (EIAs) for decommissioning O&G platforms should be carried-out on a case-by-case basis, and must include provisions for hitherto overlooked marine megafauna. PMID:27078153
Permafrost Ecosystem Warming Prototype: Installation, Operation, and Initial Site Characterization
2013-11-01
report Approved for public release; distribution is unlimited. Prepared for US Army Corps of Engineers Washington , DC 20314-1000 Monitored by...in 3 m diameter plots in a temperate deciduous forest. To further develop the prototype for an arctic climate, a similar test system was installed...growth trees and shrubs. The site was chosen because of its permafrost characteristics, ease of access, and its close proximity to the CRREL Fairbanks
Code of Federal Regulations, 2014 CFR
2014-07-01
... using a carbon adsorber as an add-on control device, you must monitor the total regeneration desorbing gas (e.g., steam or nitrogen) mass flow for each regeneration cycle, the carbon bed temperature after each regeneration and cooling cycle, and comply with paragraphs (a)(3) through (5) and (d)(1) and (2...
Code of Federal Regulations, 2010 CFR
2010-07-01
... the control device according to the requirements in paragraphs (a)(1) through (4) of this section. (1... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If... gas equivalent to 10 percent or more of the gross heat input on an annual basis, you must monitor and...
Field Demonstration of Real-Time Wind Turbine Foundation Strain Monitoring.
Rubert, Tim; Perry, Marcus; Fusiek, Grzegorz; McAlorum, Jack; Niewczas, Pawel; Brotherston, Amanda; McCallum, David
2017-12-31
Onshore wind turbine foundations are generally over-engineered as their internal stress states are challenging to directly monitor during operation. While there are industry drivers to shift towards more economical foundation designs, making this transition safely will require new monitoring techniques, so that the uncertainties around structural health can be reduced. This paper presents the initial results of a real-time strain monitoring campaign for an operating wind turbine foundation. Selected reinforcement bars were instrumented with metal packaged optical fibre strain sensors prior to concrete casting. In this paper, we outline the sensors' design, characterisation and installation, and present 67 days of operational data. During this time, measured foundation strains did not exceed 95 μ ϵ , and showed a strong correlation with both measured tower displacements and the results of a foundation finite element model. The work demonstrates that real-time foundation monitoring is not only achievable, but that it has the potential to help operators and policymakers quantify the conservatism of their existing design codes.
Field Demonstration of Real-Time Wind Turbine Foundation Strain Monitoring
Rubert, Tim; Niewczas, Pawel; Brotherston, Amanda; McCallum, David
2017-01-01
Onshore wind turbine foundations are generally over-engineered as their internal stress states are challenging to directly monitor during operation. While there are industry drivers to shift towards more economical foundation designs, making this transition safely will require new monitoring techniques, so that the uncertainties around structural health can be reduced. This paper presents the initial results of a real-time strain monitoring campaign for an operating wind turbine foundation. Selected reinforcement bars were instrumented with metal packaged optical fibre strain sensors prior to concrete casting. In this paper, we outline the sensors’ design, characterisation and installation, and present 67 days of operational data. During this time, measured foundation strains did not exceed 95 μϵ, and showed a strong correlation with both measured tower displacements and the results of a foundation finite element model. The work demonstrates that real-time foundation monitoring is not only achievable, but that it has the potential to help operators and policymakers quantify the conservatism of their existing design codes. PMID:29301232
Large Scale Application of Vibration Sensors for Fan Monitoring at Commercial Layer Hen Houses
Chen, Yan; Ni, Ji-Qin; Diehl, Claude A.; Heber, Albert J.; Bogan, Bill W.; Chai, Li-Long
2010-01-01
Continuously monitoring the operation of each individual fan can significantly improve the measurement quality of aerial pollutant emissions from animal buildings that have a large number of fans. To monitor the fan operation by detecting the fan vibration is a relatively new technique. A low-cost electronic vibration sensor was developed and commercialized. However, its large scale application has not yet been evaluated. This paper presents long-term performance results of this vibration sensor at two large commercial layer houses. Vibration sensors were installed on 164 fans of 130 cm diameter to continuously monitor the fan on/off status for two years. The performance of the vibration sensors was compared with fan rotational speed (FRS) sensors. The vibration sensors exhibited quick response and high sensitivity to fan operations and therefore satisfied the general requirements of air quality research. The study proved that detecting fan vibration was an effective method to monitor the on/off status of a large number of single-speed fans. The vibration sensor itself was $2 more expensive than a magnetic proximity FRS sensor but the overall cost including installation and data acquisition hardware was $77 less expensive than the FRS sensor. A total of nine vibration sensors failed during the study and the failure rate was related to the batches of product. A few sensors also exhibited unsteady sensitivity. As a new product, the quality of the sensor should be improved to make it more reliable and acceptable. PMID:22163544
Integrated cluster management at Manchester
NASA Astrophysics Data System (ADS)
McNab, Andrew; Forti, Alessandra
2012-12-01
We describe an integrated management system using third-party, open source components used in operating a large Tier-2 site for particle physics. This system tracks individual assets and records their attributes such as MAC and IP addresses; derives DNS and DHCP configurations from this database; creates each host's installation and re-configuration scripts; monitors the services on each host according to the records of what should be running; and cross references tickets with asset records and per-asset monitoring pages. In addition, scripts which detect problems and automatically remove hosts record these new states in the database which are available to operators immediately through the same interface as tickets and monitoring.
Curiosity Mars Rover Flexes its Robotic Arm
2010-09-16
Test operators in a clean room at NASA Jet Propulsion Laboratory monitor some of the first motions by the robotic arm on the Mars rover Curiosity after installation in August 2010. The arm is shown in a partially extended position.
40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... measure organic HAP emissions; and (iv) PS-15 of 40 CFR part 60, appendix B, for CEMS that use Fourier transform infrared spectroscopy to measure organic HAP emissions. (2) You must conduct a performance...
Final system instrumentation design package for Decade 80 solar house
NASA Technical Reports Server (NTRS)
1978-01-01
The final configuration of the Decade 80 solar house to monitor and collect system performance data is presented. A review demonstrated by actual operation that the system and the data acquisition subsystem operated satisfactorily and installation of instrumentation was in accordance with the design. This design package is made up of (1) site and system description, (2) operating and control modes, and (3) instrumentation program (including sensor schematic).
NASA Astrophysics Data System (ADS)
Vivas Veloso, J. A.; Christie, D. R.; Campus, P.; Bell, M.; Hoffmann, T. L.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.
2002-11-01
The infrasound component of the International Monitoring System (IMS) for Comprehensive Nuclear-Test-Ban Treaty verification aims for global detection and localization of low-frequency sound waves originating from atmospheric nuclear explosions. The infrasound network will consist of 60 array stations, distributed as evenly as possible over the globe to assure at least two-station detection capability for 1-kton explosions at any point on earth. This network will be larger and more sensitive than any other previously operated infrasound network. As of today, 85% of the site surveys for IMS infrasound stations have been completed, 25% of the stations have been installed, and 8% of the installations have been certified and are transmitting high-quality continuous data to the International Data Center in Vienna. By the end of 2002, 20% of the infrasound network is expected to be certified and operating in post-certification mode. This presentation will discuss the current status and progress made in the site survey, installation, and certification programs for IMS infrasound stations. A review will be presented of the challenges and difficulties encountered in these programs, together with practical solutions to these problems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... batch averages computed from two or more data points over each 1-hour period, except during periods when... performed. During these periods, a valid hour of data shall consist of at least one data point representing... volumetric flask and place the flask on a balance. Tare the balance. Weigh 2.3670 grams of the dry (anhydrous...
NASA Astrophysics Data System (ADS)
Agoritsas, V.; Beck, F.; Benincasa, G. P.; Bovigny, J. P.
1986-06-01
This paper describes a new beam loss monitor system which has been installed in the PS and PSB machines, replacing an earlier system. The new system is controlled by a microprocessor which can operate independently of the accelerator control system, though setting up and central display are usually done remotely, using the standard control system facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Inorganic HAP Emissions From Catalytic Reforming Units As stated in § 63.1567(b)(1), you shall meet each requirement in the following table that applies to you. If you use this type of control device for your vent . . . You shall install and operate this type of continuous monitoring system . . . 1. Wet scrubber...
Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baggu, Murali M; Smith, Kandler A; Friedl, Andrew
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS withmore » little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.« less
Near real time water resources data for river basin management
NASA Technical Reports Server (NTRS)
Paulson, R. W. (Principal Investigator)
1973-01-01
The author has identified the following significant results. Twenty Data Collection Platforms (DCP) are being field installed on USGS water resources stations in the Delaware River Basin. DCP's have been successfully installed and are operating well on five stream gaging stations, three observation wells, and one water quality monitor in the basin. DCP's have been installed at nine additional water quality monitors, and work is progressing on interfacing the platforms to the monitors. ERTS-related water resources data from the platforms are being provided in near real time, by the Goddard Space Flight Center to the Pennsylvania district, Water Resources Division, U.S. Geological Survey. On a daily basis, the data are computer processed by the Survey and provided to the Delaware River Basin Commission. Each daily summary contains data that were relayed during 4 or 5 of the 15 orbits made by ERTS-1 during the previous day. Water resources parameters relays by the platforms include dissolved oxygen concentrations, temperature, pH, specific conductance, well level, and stream gage height, which is used to compute stream flow for the daily summary.
Large scale implementation of guided wave based broken rail monitoring
NASA Astrophysics Data System (ADS)
Burger, Francois A.; Loveday, Philip W.; Long, Craig S.
2015-03-01
A guided wave ultrasound system has been developed over the past 17 years to detect breaks in continuously welded rail track. Installation of the version 4 system on an 840 km long heavy duty freight line was conducted between January 2013 and June 2014. The system operates in pitch - catch mode with alternate transmit and receive transducers spaced approximately 1km apart. If the acoustic signal is not received at the receive station an alarm is triggered to indicate a break in the rail between the transmit station and the receive station. The system is permanently installed, powered by solar panels and issues broken rail alarms using the GSM network where available, and digital radio technology in other areas. A total of 931 stations were installed and the entire length of rail is interrogated every fifteen minutes. The system operates reliably although some problems involving unreliable GSM communication and theft of solar panels have been experienced. In the first two months of operation four broken rails were detected and train operation was halted temporarily for repairs.
Architecting Integrated System Health Management for Airworthiness
2013-09-01
aircraft safety and reliability through condition-based maintenance [Miller et al., 1991]. With the same motivation, Integrated System Health Management...diagnostics and prognostics algorithms. 2.2.2 Health and Usage Monitoring System (HUMS) in Helicopters Increased demand for improved operational safety ...offshore shuttle helicopters traversing the petrol installations in the North Sea, and increased demand for improved operational safety and reduced
Pak, JuGeon; Park, KeeHyun
2012-01-01
We propose a smart medication dispenser having a high degree of scalability and remote manageability. We construct the dispenser to have extensible hardware architecture for achieving scalability, and we install an agent program in it for achieving remote manageability. The dispenser operates as follows: when the real-time clock reaches the predetermined medication time and the user presses the dispense button at that time, the predetermined medication is dispensed from the medication dispensing tray (MDT). In the proposed dispenser, the medication for each patient is stored in an MDT. One smart medication dispenser contains mainly one MDT; however, the dispenser can be extended to include more MDTs in order to support multiple users using one dispenser. For remote management, the proposed dispenser transmits the medication status and the system configurations to the monitoring server. In the case of a specific event such as a shortage of medication, memory overload, software error, or non-adherence, the event is transmitted immediately. All these operations are performed automatically without the intervention of patients, through the agent program installed in the dispenser. Results of implementation and verification show that the proposed dispenser operates normally and performs the management operations from the medication monitoring server suitably.
NASA Astrophysics Data System (ADS)
Adrián-Martínez, S.; Aiello, S.; Ameli, F.; Anghinolfi, M.; Ardid, M.; Barbarino, G.; Barbarito, E.; Barbato, F. C. T.; Beverini, N.; Biagi, S.; Biagioni, A.; Bouhadef, B.; Bozza, C.; Cacopardo, G.; Calamai, M.; Calì, C.; Calvo, D.; Capone, A.; Caruso, F.; Ceres, A.; Chiarusi, T.; Circella, M.; Cocimano, R.; Coniglione, R.; Costa, M.; Cuttone, G.; D'Amato, C.; D'Amico, A.; De Bonis, G.; De Luca, V.; Deniskina, N.; De Rosa, G.; di Capua, F.; Distefano, C.; Enzenhöfer, A.; Fermani, P.; Ferrara, G.; Flaminio, V.; Fusco, L. A.; Garufi, F.; Giordano, V.; Gmerk, A.; Grasso, R.; Grella, G.; Hugon, C.; Imbesi, M.; Kulikovskiy, V.; Lahmann, R.; Larosa, G.; Lattuada, D.; Leismüller, K. P.; Leonora, E.; Litrico, P.; Llorens Alvarez, C. D.; Lonardo, A.; Longhitano, F.; Lo Presti, D.; Maccioni, E.; Margiotta, A.; Marinelli, A.; Martini, A.; Masullo, R.; Migliozzi, P.; Migneco, E.; Miraglia, A.; Mollo, C. M.; Mongelli, M.; Morganti, M.; Musico, P.; Musumeci, M.; Nicolau, C. A.; Orlando, A.; Orzelli, A.; Papaleo, R.; Pellegrino, C.; Pellegriti, M. G.; Perrina, C.; Piattelli, P.; Pugliatti, C.; Pulvirenti, S.; Raffaelli, F.; Randazzo, N.; Real, D.; Riccobene, G.; Rovelli, A.; Saldaña, M.; Sanguineti, M.; Sapienza, P.; Sciacca, V.; Sgura, I.; Simeone, F.; Sipala, V.; Speziale, F.; Spitaleri, A.; Spurio, M.; Stellacci, S. M.; Taiuti, M.; Terreni, G.; Trasatti, L.; Trovato, A.; Ventura, C.; Vicini, P.; Viola, S.; Vivolo, D.
2016-02-01
The NEMO Phase-2 tower is the first detector which was operated underwater for more than 1 year at the "record" depth of 3500 m. It was designed and built within the framework of the NEMO (NEutrino Mediterranean Observatory) project. The 380 m high tower was successfully installed in March 2013 80 km offshore Capo Passero (Italy). This is the first prototype operated on the site where the Italian node of the KM3NeT neutrino telescope will be built. The installation and operation of the NEMO Phase-2 tower has proven the functionality of the infrastructure and the operability at 3500 m depth. A more than 1 year long monitoring of the deep water characteristics of the site has been also provided. In this paper the infrastructure and the tower structure and instrumentation are described. The results of long term optical background measurements are presented. The rates show stable and low baseline values, compatible with the contribution of ^{40}K light emission, with a small percentage of light bursts due to bioluminescence. All these features confirm the stability and good optical properties of the site.
Intersection Monitor for Traffic-Light-Preemption System
NASA Technical Reports Server (NTRS)
Bachelder, Aaron; Foster, Conrad
2006-01-01
The figure shows an intersection monitor that is a key subsystem of an emergency traffic-light-preemption system that could be any of the systems described in the three immediately preceding articles and in Systems Would Preempt Traffic Lights for Emergency Vehicles (NPO-30573), NASA Tech Briefs, Vol. 28, No. 10 (October 2004), page 36. This unit is so named because it is installed at an intersection, where it monitors the phases (in the sense of timing) of the traffic lights. The mode of operation of this monitor is independent of the type of traffic-light-controller hardware or software in use at the intersection. Moreover, the design of the monitor is such that (1) the monitor does not, by itself, affect the operation of the traffic- light controller and (2) in the event of a failure of the monitor, the trafficlight controller continues to function normally (albeit without preemption). The monitor is installed in series with the traffic-light controller at an intersection. The control signals of interest are monitored by use of high-impedance taps on affected control lines. These taps are fully isolated and further protected by high-voltage diodes that prevent any voltages or short circuits that arise within the monitor from affecting the controller. The signals from the taps are processed digitally and cleaned up by use of high-speed logic gates, and the resulting data are passed on to other parts of the traffic-light-preemption intersection subsystem. The data are compared continuously with data from vehicles and used to calculate timing for reliable preemption of the traffic lights. The pedestrian crossing at the intersection is also monitored, and pedestrians are warned not to cross during preemption.
NASA Astrophysics Data System (ADS)
Farhadzadeh, E. M.; Muradaliyev, A. Z.; Farzaliyev, Y. Z.
2015-10-01
A method and an algorithm of ranking of boiler installations based on their technical and economic indicators are proposed. One of the basic conditions for ranking is the independence of technical and economic indicators. The assessment of their interrelation was carried out with respect to the correlation rate. The analysis of calculation data has shown that the interrelation stability with respect to the value and sign persists only for those indicators that have an evident relationship between each other. One of the calculation steps is the normalization of quantitative estimates of technical and economic indicators, which makes it possible to eliminate differences in dimensions and indicator units. The analysis of the known methods of normalization has allowed one to recommend the relative deviation from the average value as a normalized value and to use the arithmetic mean of the normalized values of independent indicators of each boiler installation as an integrated index of performance reliability and profitability. The fundamental differences from the existing approach to assess the "weak components" of a boiler installation and the quality of monitoring of its operating regimes are that the given approach takes into account the reliability and profitability of the operation of all other analogous boiler installations of an electric power station; it also implements competing elements with respect to the quality of control among the operating personnel of separate boiler installations and is aimed at encouraging an increased quality of maintenance and repairs.
Building Capacity for Earthquake Monitoring: Linking Regional Networks with the Global Community
NASA Astrophysics Data System (ADS)
Willemann, R. J.; Lerner-Lam, A.
2006-12-01
Installing or upgrading a seismic monitoring network is often among the mitigation efforts after earthquake disasters, and this is happening in response to the events both in Sumatra during December 2004 and in Pakistan during October 2005. These networks can yield improved hazard assessment, more resilient buildings where they are most needed, and emergency relief directed more quickly to the worst hit areas after the next large earthquake. Several commercial organizations are well prepared for the fleeting opportunity to provide the instruments that comprise a seismic network, including sensors, data loggers, telemetry stations, and the computers and software required for the network center. But seismic monitoring requires more than hardware and software, no matter how advanced. A well-trained staff is required to select appropriate and mutually compatible components, install and maintain telemetered stations, manage and archive data, and perform the analyses that actually yield the intended benefits. Monitoring is more effective when network operators cooperate with a larger community through free and open exchange of data, sharing information about working practices, and international collaboration in research. As an academic consortium, a facility operator and a founding member of the International Federation of Digital Seismographic Networks, IRIS has access to a broad range of expertise with the skills that are required to help design, install, and operate a seismic network and earthquake analysis center, and stimulate the core training for the professional teams required to establish and maintain these facilities. But delivering expertise quickly when and where it is unexpectedly in demand requires advance planning and coordination in order to respond to the needs of organizations that are building a seismic network, either with tight time constraints imposed by the budget cycles of aid agencies following a disastrous earthquake, or as part of more informed national programs for hazard assessment and mitigation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agazzone, U.; Ausiello, F.P.
1981-06-23
A power-generating installation comprises a plurality of modular power plants each comprised of an internal combustion engine connected to an electric machine. The electric machine is used to start the engine and thereafter operates as a generator supplying power to an electrical network common to all the modular plants. The installation has a control and protection system comprising a plurality of control modules each associated with a respective plant, and a central unit passing control signals to the modules to control starting and stopping of the individual power plants. Upon the detection of abnormal operation or failure of its associatedmore » power plant, each control module transmits an alarm signal back to the central unit which thereupon stops, or prevents the starting, of the corresponding power plant. Parameters monitored by each control module include generated current and inter-winding leakage current of the electric machine.« less
Code of Federal Regulations, 2012 CFR
2012-07-01
... document is available on the EPA's Technology Transfer Network at http://www.epa.gov/ttn/emc/cem/tribo.pdf... alignment of each COMS. (3) You must operate and maintain each COMS according to § 63.8(e) and your quality... alignment audit. (4) You must determine and record the 6-minute average opacity for periods during which the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... document is available on the EPA's Technology Transfer Network at http://www.epa.gov/ttn/emc/cem/tribo.pdf... alignment of each COMS. (3) You must operate and maintain each COMS according to § 63.8(e) and your quality... alignment audit. (4) You must determine and record the 6-minute average opacity for periods during which the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... document is available on the EPA's Technology Transfer Network at http://www.epa.gov/ttn/emc/cem/tribo.pdf... alignment of each COMS. (3) You must operate and maintain each COMS according to § 63.8(e) and your quality... alignment audit. (4) You must determine and record the 6-minute average opacity for periods during which the...
Dose assessment of aircraft crew in The Netherlands.
Van Dijk, J W E
2003-01-01
As the operator of the National Dose Registration and Information System, NRG has implemented a system for radiation exposure monitoring for the Dutch airlines. The system is based on the use of computer generated flight plans together with dose calculations using the CARI-6M program. Before installing the system a study was performed to estimate the uncertainty in the assessment of the annual dose of the crew members. It was concluded that the proposed system complies with international recommendations on the uncertainty in dose assessments in individual monitoring and that the operational costs of the system are low.
RELIABILITY TESTING OF AN ON-HARVESTER COTTON WEIGHT MEASUREMENT SYSTEM
USDA-ARS?s Scientific Manuscript database
A system for weighing seed cotton onboard stripper harvesters was developed and installed on several producer owned and operated machines. The weight measurement system provides critical information to producers when in the process of calibrating yield monitors or conducting on-farm research. The ...
49 CFR 195.444 - CPM leak detection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false CPM leak detection. 195.444 Section 195.444... PIPELINE Operation and Maintenance § 195.444 CPM leak detection. Each computational pipeline monitoring (CPM) leak detection system installed on a hazardous liquid pipeline transporting liquid in single...
40 CFR 60.273 - Emission monitoring.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may....273 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... installs and continuously operates a bag leak detection system according to paragraph (e) of this section...
40 CFR 60.273 - Emission monitoring.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may....273 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... installs and continuously operates a bag leak detection system according to paragraph (e) of this section...
40 CFR 60.273a - Emission monitoring.
Code of Federal Regulations, 2013 CFR
2013-07-01
... following: (1) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other....273a Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... by a certified visible emission observer and the owner installs and continuously operates a bag leak...
40 CFR 60.273 - Emission monitoring.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may....273 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... installs and continuously operates a bag leak detection system according to paragraph (e) of this section...
40 CFR 60.273a - Emission monitoring.
Code of Federal Regulations, 2014 CFR
2014-07-01
... following: (1) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other....273a Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... by a certified visible emission observer and the owner installs and continuously operates a bag leak...
40 CFR 60.273a - Emission monitoring.
Code of Federal Regulations, 2012 CFR
2012-07-01
... following: (1) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other....273a Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... by a certified visible emission observer and the owner installs and continuously operates a bag leak...
Assessing the induced seismicity by hydraulic fracturing at the Wysin site (Poland)
NASA Astrophysics Data System (ADS)
Ángel López Comino, José; Cesca, Simone; Kriegerowski, Marius; Heimann, Sebastian; Dahm, Torsten; Mirek, Janusz; Lasocky, Stanislaw
2017-04-01
Induced seismicity related to industrial processes including shale gas and oil exploitation is a current issues that implies enough reasons to be concerned. Hydraulic fracturing usually induces weak events. However, scenarios with larger earthquakes are possible, e.g. if the injected fluids alter friction conditions and trigger the failure of neighbouring faults. This work is focused on a hydrofracking experiment monitored in the framework of the SHEER (SHale gas Exploration and Exploitation induced Risks) EU project at the Wysin site, located in the central-western part of the Peribaltic synclise of Pomerania, Poland. A specific network setup has been installed combining surface installation with three small-scale arrays and a shallow borehole installation. The fracking operations were carried out in June and July 2016 at a depth 4000 m. The monitoring has been operational before, during and after the termination of hydraulic fracturing operations. We apply a recently developed automated full waveform detection algorithm based on the stacking of smooth characteristic function and the identification of high coherence in the signals recorded at different stations. The method was tested with synthetic data and different detector levels yielding values of magnitude of completeness around 0.1. An unsupervised detection catalogue is generated with real data for a time period May-September 2016. We identify strong temporal changes (day/night) of the detection performance. A manual revision of the detected signals reveals that most detections are associated to local and regional seismic signals. Only two events could be assigned to the volume potentially affected by the fracking operations.
Measured Performance of a Low Temperature Air Source Heat Pump
DOE Office of Scientific and Technical Information (OSTI.GOV)
R.K. Johnson
2013-09-01
A 4-ton Low Temperature Heat Pump (LTHP) manufactured by Hallowell International was installed in a residence near New Haven, Connecticut and monitored over two winters of operation. After attending to some significant service issues, the heat pump operated as designed. This report should be considered a review of the dual compressor “boosted heat pump” technology. The Low Temperature Heat Pump system operates with four increasing levels of capacity (heat output) as the outdoor temperature drops.
Performance of a reentrant cavity beam position monitor
NASA Astrophysics Data System (ADS)
Simon, Claire; Luong, Michel; Chel, Stéphane; Napoly, Olivier; Novo, Jorge; Roudier, Dominique; Rouvière, Nelly; Baboi, Nicoleta; Mildner, Nils; Nölle, Dirk
2008-08-01
The beam-based alignment and feedback systems, essential operations for the future colliders, require high resolution beam position monitors (BPMs). In the framework of the European CARE/SRF program, a reentrant cavity BPM with its associated electronics was developed by the CEA/DSM/Irfu in collaboration with DESY. The design, the fabrication, and the beam test of this monitor are detailed within this paper. This BPM is designed to be inserted in a cryomodule, work at cryogenic temperature in a clean environment. It has achieved a resolution better than 10μm and has the possibility to perform bunch to bunch measurements for the x-ray free electron laser (X-FEL) and the International Linear Collider (ILC). Its other features are a small size of the rf cavity, a large aperture (78 mm), and an excellent linearity. A first prototype of a reentrant cavity BPM was installed in the free electron laser in Hamburg (FLASH), at Deutsches Elektronen-Synchrotron (DESY) and demonstrated its operation at cryogenic temperature inside a cryomodule. The second, installed, also, in the FLASH linac to be tested with beam, measured a resolution of approximately 4μm over a dynamic range ±5mm in single bunch.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Nikolich, George; Shadel, Craig
In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to Clean Slate I and Clean Slate III, and at the TTR Sandia National Laboratories (SNL) Range Operations Control (ROC) center. The primary objective ofmore » the monitoring effort is to determine if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krichinsky, Alan M; Bates, Bruce E; Chesser, Joel B
2009-12-01
This report describes an engineering-scale, mock UF6 feed and withdrawal (F&W) system, its operation, and its intended uses. This system has been assembled to provide a test bed for evaluating and demonstrating new methodologies that can be used in remote, unattended, continuous monitoring of nuclear material process operations. These measures are being investigated to provide independent inspectors improved assurance that operations are being conducted within declared parameters, and to increase the overall effectiveness of safeguarding nuclear material. Testing applicable technologies on a mock F&W system, which uses water as a surrogate for UF6, enables thorough and cost-effective investigation of hardware,more » software, and operational strategies before their direct installation in an industrial nuclear material processing environment. Electronic scales used for continuous load-cell monitoring also are described as part of the basic mock F&W system description. Continuous monitoring components on the mock F&W system are linked to a data aggregation computer by a local network, which also is depicted. Data collection and storage systems are described only briefly in this report. The mock UF{sub 6} F&W system is economical to operate. It uses a simple process involving only a surge tank between feed tanks and product and withdrawal (or waste) tanks. The system uses water as the transfer fluid, thereby avoiding the use of hazardous UF{sub 6}. The system is not tethered to an operating industrial process involving nuclear materials, thereby allowing scenarios (e.g., material diversion) that cannot be conducted otherwise. These features facilitate conducting experiments that yield meaningful results with a minimum of expenditure and quick turnaround time. Technologies demonstrated on the engineering-scale system lead to field trials (described briefly in this report) for determining implementation issues and performance of the monitoring technologies under plant operating conditions. The ultimate use of technologies tested on the engineering-scale test bed is to work with safeguards agencies to install them in operating plants (e.g., enrichment and fuel processing plants), thereby promoting new safeguards measures with minimal impact to operating plants. In addition, this system is useful in identifying features for new plants that can be incorporated as part of 'safeguards by design,' in which load cells and other monitoring technologies are specified to provide outputs for automated monitoring and inspector evaluation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dooling, J.; Harkay, K.; Ivanyushenkov, Y.
2015-01-01
We report on the calibration and use of fast fiber-optic (FO) beam loss monitors (BLMs) in the Advanced Photon Source storage ring (SR). A superconducting undulator prototype (SCU0) has been operating in SR Sector 6 (“ID6”) since the beginning of CY2013, and another undulator SCU1 (a 1.1-m length undulator that is three times the length of SCU0) is scheduled for installation in Sector 1 (“ID1”) in 2015. The SCU0 main coil often quenches during beam dumps. MARS simulations have shown that relatively small beam loss (<1 nC) can lead to temperature excursions sufficient to cause quenchingwhen the SCU0windings are nearmore » critical current. To characterize local beam losses, high-purity fused-silica FO cables were installed in ID6 on the SCU0 chamber transitions and in ID1 where SCU1 will be installed. These BLMs aid in the search for operating modes that protect the SCU structures from beam-loss-induced quenching. In this paper, we describe the BLM calibration process that included deliberate beam dumps at locations of BLMs. We also compare beam dump events where SCU0 did and did not quench.« less
Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lum, Clinton C. L.
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less
DOT National Transportation Integrated Search
1979-09-01
An analysis was made of the potential legal constraints on the use of mechanical devices to supervise drinking and driving restrictions. These conceptual devices would be installed on vehicles operated by restricted drivers. Two devices contain psych...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...
40 CFR 60.57c - Monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 60.57c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... defined in § 60.50c(a)(3) and (4) that uses selective noncatalytic reduction technology shall install... date, time, and duration. (d) The owner or operator of an affected facility using an air pollution...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing Continuous Compliance Requirements § 63.9632 What are...
40 CFR 60.57c - Monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 60.57c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... defined in § 60.50c(a)(3) and (4) that uses selective noncatalytic reduction technology shall install... date, time, and duration. (d) The owner or operator of an affected facility using an air pollution...
40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing Continuous Compliance Requirements § 63.9632 What are...
40 CFR 60.57c - Monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... pressure or induced air fabric filters, the bag leak detector shall be installed downstream of the fabric... 60.57c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... owner or operator of an affected facility using an air pollution control device other than a dry...
40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...
40 CFR 60.57c - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... pressure or induced air fabric filters, the bag leak detector shall be installed downstream of the fabric... 60.57c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... owner or operator of an affected facility using an air pollution control device other than a dry...
40 CFR 63.11527 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... an existing affected source, you may install, operate, and maintain a bag leak detection system for...
40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...
40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...
40 CFR 63.11527 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... an existing affected source, you may install, operate, and maintain a bag leak detection system for...
40 CFR 63.11527 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... an existing affected source, you may install, operate, and maintain a bag leak detection system for...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jammes, C.; Filliatre, P.; De Izarra, G.
The neutron flux monitoring system of the French GEN-IV sodium-cooled fast reactor will rely on high temperature fission chambers installed in the reactor vessel and capable of operating over a wide-range neutron flux. The definition of such a system is presented and the technological solutions are justified with the use of simulation and experimental results. (authors)
NASA Astrophysics Data System (ADS)
Ballan, Michele; Manzolaro, Mattia; Meneghetti, Giovanni; Andrighetto, Alberto; Monetti, Alberto; Bisoffi, Giovanni; Prete, Gianfranco
2016-06-01
The SPES project at INFN-LNL aims at the production of neutron-rich Radioactive Ion Beams (RIBs) using the ISOL (Isotope Separation On Line) technique. A 40 MeV 200 μA proton beam will directly impinge a uranium carbide target, generating approximately 1013 fissions per second. The target system is installed under vacuum inside a water-cooled chamber, and have to maintain high working temperatures, close to 2000 °C. During operation the proton beam provides the heating power required to keep the target at the desired temperature level. As a consequence, its characteristics have to be strictly controlled in order to avoid undesired overheating. According to the original design of the control system, the proton beam can be suddenly interrupted in case of out of range vacuum or cooling water flow levels. With the aim to improve the reliability of the control system a set of temperature sensors has been installed close to the target. Their types and installation positions were defined taking into consideration the detailed information coming from a dedicated thermal-electric model that allowed to investigate the most critical and inaccessible target hot-spots. This work is focused on the definition and experimental validation of the aforementioned numerical model. Its results were used to appropriately install two type C thermocouples, a PT100 thermo-resistance and a residual primary beam current detector. In addition the numerical model will be used for the definition of appropriate thresholds for each installed temperature sensor, since it allows to define a relationship between the locally measured values with the overall calculated temperature field. In case of over temperatures the monitoring system will send warning signals or in case interrupt the proton beam.
Feasibility study on a strain based deflection monitoring system for wind turbine blades
NASA Astrophysics Data System (ADS)
Lee, Kyunghyun; Aihara, Aya; Puntsagdash, Ganbayar; Kawaguchi, Takayuki; Sakamoto, Hiraku; Okuma, Masaaki
2017-01-01
The bending stiffness of the wind turbine blades has decreased due to the trend of wind turbine upsizing. Consequently, the risk of blades breakage by hitting the tower has increased. In order to prevent such incidents, this study proposes a deflection monitoring system that can be installed to already operating wind turbine's blades. The monitoring system is composed of an estimation algorithm to detect blade deflection and a wireless sensor network as a hardware equipment. As for the estimation method for blade deflection, a strain-based estimation algorithm and an objective function for optimal sensor arrangement are proposed. Strain-based estimation algorithm is using a linear correlation between strain and deflections, which can be expressed in a form of a transformation matrix. The objective function includes the terms of strain sensitivity and condition number of the transformation matrix between strain and deflection. In order to calculate the objective function, a simplified experimental model of the blade is constructed by interpolating the mode shape of a blade from modal testing. The interpolation method is effective considering a practical use to operating wind turbines' blades since it is not necessary to establish a finite element model of a blade. On the other hand, a sensor network with wireless connection with an open source hardware is developed. It is installed to a 300 W scale wind turbine and vibration of the blade on operation is investigated.
Data Quality Monitoring System for New GEM Muon Detectors for the CMS Experiment Upgrade
NASA Astrophysics Data System (ADS)
King, Robert; CMS Muon Group Team
2017-01-01
The Gas Electron Multiplier (GEM) detectors are novel detectors designed to improve the muon trigger and tracking performance in CMS experiment for the high luminosity upgrade of the LHC. Partial installation of GEM detectors is planned during the 2016-2017 technical stop. Before the GEM system is installed underground, its data acquisition (DAQ) electronics must be thoroughly tested. The DAQ system includes several commercial and custom-built electronic boards running custom firmware. The front-end electronics are radiation-hard and communicate via optical fibers. The data quality monitoring (DQM) software framework has been designed to provide online verification of the integrity of the data produced by the detector electronics, and to promptly identify potential hardware or firmware malfunctions in the system. Local hits reconstruction and clustering algorithms allow quality control of the data produced by each GEM chamber. Once the new detectors are installed, the DQM will monitor the stability and performance of the system during normal data-taking operations. We discuss the design of the DQM system, the software being developed to read out and process the detector data, and the methods used to identify and report hardware and firmware malfunctions of the system.
40 CFR 60.1230 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2012 CFR
2012-07-01
... according to the “Monitoring Requirements” in § 60.13. (c) You must monitor the oxygen (or carbon dioxide... systems must I install for gaseous pollutants? 60.1230 Section 60.1230 Protection of Environment... Continuous Emission Monitoring § 60.1230 What continuous emission monitoring systems must I install for...
40 CFR 60.1230 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2014 CFR
2014-07-01
... according to the “Monitoring Requirements” in § 60.13. (c) You must monitor the oxygen (or carbon dioxide... systems must I install for gaseous pollutants? 60.1230 Section 60.1230 Protection of Environment... Continuous Emission Monitoring § 60.1230 What continuous emission monitoring systems must I install for...
40 CFR 60.1230 - What continuous emission monitoring systems must I install for gaseous pollutants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... according to the “Monitoring Requirements” in § 60.13. (c) You must monitor the oxygen (or carbon dioxide... systems must I install for gaseous pollutants? 60.1230 Section 60.1230 Protection of Environment... Continuous Emission Monitoring § 60.1230 What continuous emission monitoring systems must I install for...
2009-11-01
Eglin Parkway,Shalimar,FL,32579 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR...separately secured installation between 1950 and 1962 responsible for the storage, maintenance, and loading of atomic and thermonuclear weapons. The...portion of Ellsworth AFB and was operational between 1950 and 1962 (ACC 1997). It was operated by Air Force Materiel Command (AFMC), Armed Forces
An automated environment for multiple spacecraft engineering subsystem mission operations
NASA Technical Reports Server (NTRS)
Bahrami, K. A.; Hioe, K.; Lai, J.; Imlay, E.; Schwuttke, U.; Hsu, E.; Mikes, S.
1990-01-01
Flight operations at the Jet Propulsion Laboratory (JPL) are now performed by teams of specialists, each team dedicated to a particular spacecraft. Certain members of each team are responsible for monitoring the performances of their respective spacecraft subsystems. Ground operations, which are very complex, are manual, labor-intensive, slow, and tedious, and therefore costly and inefficient. The challenge of the new decade is to operate a large number of spacecraft simultaneously while sharing limited human and computer resources, without compromising overall reliability. The Engineering Analysis Subsystem Environment (EASE) is an architecture that enables fewer controllers to monitor and control spacecraft engineering subsystems. A prototype of EASE has been installed in the JPL Space Flight Operations Facility for on-line testing. This article describes the underlying concept, development, testing, and benefits of the EASE prototype.
The development of a tele-monitoring system for physiological parameters based on the B/S model.
Shuicai, Wu; Peijie, Jiang; Chunlan, Yang; Haomin, Li; Yanping, Bai
2010-01-01
The development of a new physiological multi-parameter remote monitoring system is based on the B/S model. The system consists of a server monitoring center, Internet network and PC-based multi-parameter monitors. Using the B/S model, the clients can browse web pages via the server monitoring center and download and install ActiveX controls. The physiological multi-parameters are collected, displayed and remotely transmitted. The experimental results show that the system is stable, reliable and operates in real time. The system is suitable for use in physiological multi-parameter remote monitoring for family and community healthcare. Copyright © 2010 Elsevier Ltd. All rights reserved.
2008-06-18
CAPE CANAVERAL, Fla. – The Cupola, another module built in Italy for the United States segment of the International Space Station, resides in the Space Station Processing Facility. With 360-degree windows, it will serve as a literal skylight to control some of the most sophisticated robotics ever built. The space station crew will use Cupola windows, six around the sides and one on the top, for line-of-sight monitoring of outside activities, including spacewalks, docking operations and exterior equipment surveys. The Cupola will be used specifically to monitor the approach and berthing of the Japanese H-2 supply spacecraft and other visiting vehicles. The Cupola also will serve as the primary location for controlling Canadarm2, the 60-foot space station robotic arm. Space station crews currently use two robotic control workstations in the Destiny laboratory to operate the arm. One of the robotic control stations will be placed inside the Cupola. The view from the Cupola will enhance an arm operator's situational awareness, supplementing television cameras and graphics. The Cupola is scheduled to launch on a future space station assembly mission. It will be installed on the forward port of Node 3, a connecting module to be installed as well. Photo credit: NASA/Kim Shiflett
2008-06-18
CAPE CANAVERAL, Fla. – The Cupola, another module built in Italy for the United States segment of the International Space Station, resides in the Space Station Processing Facility. With 360-degree windows, it will serve as a literal skylight to control some of the most sophisticated robotics ever built. The space station crew will use Cupola windows, six around the sides and one on the top, for line-of-sight monitoring of outside activities, including spacewalks, docking operations and exterior equipment surveys. The Cupola will be used specifically to monitor the approach and berthing of the Japanese H-2 supply spacecraft and other visiting vehicles. The Cupola also will serve as the primary location for controlling Canadarm2, the 60-foot space station robotic arm. Space station crews currently use two robotic control workstations in the Destiny laboratory to operate the arm. One of the robotic control stations will be placed inside the Cupola. The view from the Cupola will enhance an arm operator's situational awareness, supplementing television cameras and graphics. The Cupola is scheduled to launch on a future space station assembly mission. It will be installed on the forward port of Node 3, a connecting module to be installed as well. Photo credit: NASA/Kim Shiflett
2008-06-18
CAPE CANAVERAL, Fla. – The Cupola, another module built in Italy for the United States segment of the International Space Station, resides in the Space Station Processing Facility. With 360-degree windows, it will serve as a literal skylight to control some of the most sophisticated robotics ever built. The space station crew will use Cupola windows, six around the sides and one on the top, for line-of-sight monitoring of outside activities, including spacewalks, docking operations and exterior equipment surveys. The Cupola will be used specifically to monitor the approach and berthing of the Japanese H-2 supply spacecraft and other visiting vehicles. The Cupola also will serve as the primary location for controlling Canadarm2, the 60-foot space station robotic arm. Space station crews currently use two robotic control workstations in the Destiny laboratory to operate the arm. One of the robotic control stations will be placed inside the Cupola. The view from the Cupola will enhance an arm operator's situational awareness, supplementing television cameras and graphics. The Cupola is scheduled to launch on a future space station assembly mission. It will be installed on the forward port of Node 3, a connecting module to be installed as well. Photo credit: NASA/Kim Shiflett
Event-synchronized data acquisition system for the SPring-8 linac beam position monitors
NASA Astrophysics Data System (ADS)
Masuda, T.; Fukui, T.; Tanaka, R.; Taniuchi, T.; Yamashita, A.; Yanagida, K.
2005-05-01
By the summer of 2003, we had completed the installation of a new non-destructive beam position monitor (BPM) system to facilitate beam trajectory and energy correction for the SPring-8 linac. In all, 47 BPM sets were installed on the 1-GeV linac and three beam-transport lines. All of the BPM data acquisition system was required to operate synchronously with the electron beam acceleration cycle. We have developed an event-synchronized data acquisition system for the BPM data readout. We have succeeded in continuously taking all the BPMs data from six VME computers synchronized with the 10 pps operation of the linac to continuously acquire data. For each beam shot, the data points are indexed by event number and stored in a database. Using the real-time features of the Solaris operating system and distributed database technology, we currently have achieved about 99.9% efficiency in capturing and archiving all of the 10 Hz data. The linac BPM data is available for off-line analysis of the beam trajectory, but also for real-time control and automatic correction of the beam trajectory and energy.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
..., paper mill, saw mill, and oil refinery repairs; casting services for ``grey iron and brass,'' including... surface soil hot spots, sampling of surface water and sediment in the canals, stratigraphic profiling with..., monitor well installation, ground water sampling, and aquifer testing. Foundry operations resulted in...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., or to temperature simulation devices. (vi) Conduct a visual inspection of each sensor every quarter... sensor values with electronic signal simulations or via relative accuracy testing. (v) Perform accuracy... values with electronic signal simulations or with values obtained via relative accuracy testing. (vi...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., or to temperature simulation devices. (vi) Conduct a visual inspection of each sensor every quarter... sensor values with electronic signal simulations or via relative accuracy testing. (v) Perform accuracy... values with electronic signal simulations or with values obtained via relative accuracy testing. (vi...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., or to temperature simulation devices. (vi) Conduct a visual inspection of each sensor every quarter... sensor values with electronic signal simulations or via relative accuracy testing. (v) Perform accuracy... values with electronic signal simulations or with values obtained via relative accuracy testing. (vi...
40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...
40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...
Solar energy system performance evaluation report for IBM System 3, Glendo, Wyoming
NASA Technical Reports Server (NTRS)
1980-01-01
The analysis used was based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is described. Technical contributions to the definition of techniques and requirements for solar energy system design are given.
40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with... owners manual. Following the electronic calibration, you must conduct a temperature sensor validation check in which a second or redundant temperature sensor placed nearby the process temperature sensor...
50 CFR 404.5 - Requirements for a vessel monitoring system.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Requirement for use. Effective August 28, 2006, an owner or operator of a vessel that has been issued a permit... Magnuson-Stevens Fishery Conservation and Management Act, the Secretaries may have access to, and use of, collected data for scientific, statistical, and management purposes. (f) Authority for installation and...
50 CFR 404.5 - Requirements for a vessel monitoring system.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Requirement for use. Effective August 28, 2006, an owner or operator of a vessel that has been issued a permit... Magnuson-Stevens Fishery Conservation and Management Act, the Secretaries may have access to, and use of, collected data for scientific, statistical, and management purposes. (f) Authority for installation and...
40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with... owners manual. Following the electronic calibration, you must conduct a temperature sensor validation check in which a second or redundant temperature sensor placed nearby the process temperature sensor...
40 CFR 63.11583 - What are my monitoring requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... applicable, and the following: (1) Locate the pressure sensor(s) in, or as close as possible to, a position... comparing the sensor output to redundant sensor output. (4) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range or install a new pressure sensor. (5...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
40 CFR 265.1080 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the requirements of paragraph (f)(2) of this section. (i) The Sistersville Plant shall install an air... all air pollution control and monitoring equipment described in paragraphs (f)(2)(i)(A) and (f)(2)(ii... is operated in a manner consistent with good air pollution control practices. (ii) Ensure that the...
40 CFR 264.1080 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements of paragraph (f)(2) of this section. (i) The Sistersville Plant shall install an air pollution... all air pollution control and monitoring equipment described in paragraphs (f)(2)(i)(A) and (f)(2)(ii... is operated in a manner consistent with good air pollution control practices. (ii) Ensure that the...
40 CFR 264.1080 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements of paragraph (f)(2) of this section. (i) The Sistersville Plant shall install an air pollution... all air pollution control and monitoring equipment described in paragraphs (f)(2)(i)(A) and (f)(2)(ii... is operated in a manner consistent with good air pollution control practices. (ii) Ensure that the...
40 CFR 265.1080 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the requirements of paragraph (f)(2) of this section. (i) The Sistersville Plant shall install an air... all air pollution control and monitoring equipment described in paragraphs (f)(2)(i)(A) and (f)(2)(ii... is operated in a manner consistent with good air pollution control practices. (ii) Ensure that the...
40 CFR 264.1080 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements of paragraph (f)(2) of this section. (i) The Sistersville Plant shall install an air pollution... all air pollution control and monitoring equipment described in paragraphs (f)(2)(i)(A) and (f)(2)(ii... is operated in a manner consistent with good air pollution control practices. (ii) Ensure that the...
40 CFR 265.1080 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the requirements of paragraph (f)(2) of this section. (i) The Sistersville Plant shall install an air... all air pollution control and monitoring equipment described in paragraphs (f)(2)(i)(A) and (f)(2)(ii... is operated in a manner consistent with good air pollution control practices. (ii) Ensure that the...
40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...
40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...
40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...
40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...
40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...
Code of Federal Regulations, 2011 CFR
2011-07-01
... flue gases at the inlet of my particulate matter control device? 60.1325 Section 60.1325 Protection of... the inlet of my particulate matter control device? You must install, calibrate, maintain, and operate... particulate matter control device. ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... flue gases at the inlet of my particulate matter control device? 60.1325 Section 60.1325 Protection of... the inlet of my particulate matter control device? You must install, calibrate, maintain, and operate... particulate matter control device. ...
40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... compartment or cell. (7) For negative pressure or induced air fabric filters, the bag leak detector must be... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... compartment or cell. (7) For negative pressure or induced air fabric filters, the bag leak detector must be... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... compartment or cell. (7) For negative pressure or induced air fabric filters, the bag leak detector must be... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... compartment or cell. (7) For negative pressure or induced air fabric filters, the bag leak detector must be... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...
Natural Bridges National Monument photovoltaic power plant operations manual
NASA Astrophysics Data System (ADS)
Coleman, S. D.
1982-02-01
After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.
Stennis all-hazards network adopted throughout NASA
2009-10-13
Stennis Space Center employees Mike McKinion (left), with Erica Lane Enterprises, and Luke Scianna, with the Jacobs Facility Operating Services Contract, monitor the facility and surrounding area on the 'all-hazards network' known as HazNet. The HazNet system at Stennis was developed by a local Mississippi company to help facilitate coordinated response during emergency and disaster situations. The system was installed in the new Emergency Operations Center built at Stennis before being implemented throughout NASA. HazNet was designed by NVision Solutions Inc. of Bay St. Louis, Miss., through NASA's Innovative Partnerships Program. In addition to being used at Stennis, it has been installed at other Gulf Coast communities to help coordinate response during emergencies and such natural disasters as hurricanes.
Quantifying exchange between groundwater and surface water in rarely measured organic sediments
NASA Astrophysics Data System (ADS)
Rosenberry, D. O.; Cavas, M.; Keith, D.; Gefell, M. J.; Jones, P. M.
2016-12-01
Transfer of water and chemicals between poorly competent organic sediments and surface water in low-energy riverine and lentic settings depends on several factors, including rate and direction of flow, redox state, number and type of benthic invertebrates, and chemical gradients at and near the sediment-water interface. In spite of their commonly large areal extent, direct measurements of flow in soft, organic sediments are rarely made and little is known about flux direction, rate, or heterogeneity. Commonly used monitoring wells are difficult to install and suffer from slow response to changing hydraulic head due to the low permeability of these sediments. Seepage meters can directly quantify seepage flux if several challenges can be overcome. Meters are difficult to install and operate where water is deep, visibility is poor, and the position of the sediment-water interface is not readily apparent. Soft, easily eroded sediment can be displaced during meter installation, creating bypass flow beneath the bottom of the seepage cylinder. Poorly competent sediments often cannot support the weight of the meters; they slowly sink into the bed and displace water inside the seepage cylinder, which leads to the interpretation of large upward flow. Decaying organic material within the sediment generates gas that can displace water and corrupt seepage-meter measurements. Several inexpensive modifications to a standard seepage meter, as well as precautions during installation and operation, can minimize these sources of error. Underwater video cameras can be mounted to the meter to remotely observe sediment disturbance during sensor installation and monitor the stability of the meter insertion depth during the period of deployment. Anchor rods can be driven a meter or more into the sediment until refusal, firmly anchoring the seepage meter at a constant sediment insertion depth. Data collected from modified seepage meters installed in Minnesota and New York demonstrate the importance of quantifying flows in these challenging settings where biogeochemistry is complex and seepage rates commonly have been assumed to be insignificantly small.
40 CFR 60.3038 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2012 CFR
2012-07-01
... systems must I install? 60.3038 Section 60.3038 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install... carbon monoxide and for oxygen. You must monitor the oxygen concentration at each location where you...
40 CFR 60.3038 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2014 CFR
2014-07-01
... systems must I install? 60.3038 Section 60.3038 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install... carbon monoxide and for oxygen. You must monitor the oxygen concentration at each location where you...
40 CFR 60.3038 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2013 CFR
2013-07-01
... systems must I install? 60.3038 Section 60.3038 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install... carbon monoxide and for oxygen. You must monitor the oxygen concentration at each location where you...
Tsiourlis, Georgios; Andreadakis, Stamatis; Konstantinidis, Pavlos
2009-01-01
The SITHON system, a fully wireless optical imaging system, integrating a network of in-situ optical cameras linking to a multi-layer GIS database operated by Control Operating Centres, has been developed in response to the need for early detection, notification and monitoring of forest fires. This article presents in detail the architecture and the components of SITHON, and demonstrates the first encouraging results of an experimental test with small controlled fires over Sithonia Peninsula in Northern Greece. The system has already been scheduled to be installed in some fire prone areas of Greece. PMID:22408536
Reduction of police vehicle accidents through mechaniically aided supervision
Larson, Lynn D.; Schnelle, John F.; Kirchner, Robert; Carr, Adam F.; Domash, Michele; Risley, Todd R.
1980-01-01
Tachograph recorders were installed in 224 vehicles of a metropolitan police department to monitor vehicle operation in an attempt to reduce the rate of accidents. Police sergeants reviewed each tachograph chart and provided feedback to officers regarding their driving performance. Reliability checks and additional feedback procedures were implemented so that upper level supervisors monitored and controlled the performance of field sergeants. The tachograph intervention and components of the feedback system nearly eliminated personal injury accidents and sharply reduced accidents caused by officer negligence. A cost-benefit analysis revealed that the savings in vehicle repair and injury claims outweighed the equipment and operating costs. PMID:16795634
Data Fusion Tool for Spiral Bevel Gear Condition Indicator Data
NASA Technical Reports Server (NTRS)
Dempsey, Paula J.; Antolick, Lance J.; Branning, Jeremy S.; Thomas, Josiah
2014-01-01
Tests were performed on two spiral bevel gear sets in the NASA Glenn Spiral Bevel Gear Fatigue Test Rig to simulate the fielded failures of spiral bevel gears installed in a helicopter. Gear sets were tested until damage initiated and progressed on two or more gear or pinion teeth. During testing, gear health monitoring data was collected with two different health monitoring systems. Operational parameters were measured with a third data acquisition system. Tooth damage progression was documented with photographs taken at inspection intervals throughout the test. A software tool was developed for fusing the operational data and the vibration based gear condition indicator (CI) data collected from the two health monitoring systems. Results of this study illustrate the benefits of combining the data from all three systems to indicate progression of damage for spiral bevel gears. The tool also enabled evaluation of the effectiveness of each CI with respect to operational conditions and fault mode.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Canfield, K.J.
1984-05-01
An EMCS (Energy Monitoring and Control System) can be described as a system that automatically takes care of routine operation of equipment and provides centralized reporting and override capabilities. Equipment controlled by an EMCS would be heating, ventilating, and air conditioning (HVAC) equipment, air compressors, and small package boiler units. The EMCS would obtain raw information (data) from sensors associated with the equipment and massage the data into useful information. The information obtained from the sensors plus additional information available to the EMCS would be used to control the equipment. The information would also be available to the operator inmore » the form of reports or in response to operator commands for specific information. EMCS are computerized systems that control and monitor energy consuming and producing equipment at Naval facilities. The larger systems have been installed with color-graphics cathode ray tube operator consoles to provide better information to the personnel operating these systems. This report summarizes the work done on defining an adequate operator console and recommends changes to the existing EMCS Guide Specifications.« less
Bender, David A.; Rowe, Barbara L.
2015-01-01
Ellsworth Air Force Base is an Air Combat Command located approximately 10 miles northeast of Rapid City, South Dakota. Ellsworth Air Force Base occupies about 6,000 acres within Meade and Pennington Counties, and includes runways, airfield operations, industrial areas, housing, and recreational facilities. Fuels Area C within Ellsworth Air Force Base is a fuels storage area that is used to support the mission of the base. In fall of 2013, the U.S. Geological Survey began a study in cooperation with the U.S. Air Force, Ellsworth Air Force Base, to estimate groundwater-flow direction, select locations for permanent monitoring wells, and install and sample monitoring wells for petroleum hydrocarbon compounds within Fuels Area C. Nine monitoring wells were installed for the study within Fuels Area C during November 4–7, 2014. Soil core samples were collected during installation of eight of the monitoring wells and analyzed for benzene, toluene, ethylbenzene, total xylenes, naphthalene,m- and p-xylene, o-xylene, and gasoline- and diesel-range organic compounds. Groundwater samples were collected from seven of the nine wells (two of the monitoring wells did not contain enough water to sample or were dry) during November 19–21, 2014, and analyzed for select physical properties, benzene, toluene, ethylbenzene, total xylenes, naphthalene, m- and p-xylene, o-xylene, and gasoline- and diesel-range organic compounds. This report describes the nine monitoring well locations and presents the soil- and groundwater-quality data collected in 2014 for this study.
Geoelectric monitoring at the Boulder magnetic observatory
Blum, Cletus; White, Tim; Sauter, Edward A.; Stewart, Duff; Bedrosian, Paul A.; Love, Jeffrey J.
2017-01-01
Despite its importance to a range of applied and fundamental studies, and obvious parallels to a robust network of magnetic-field observatories, long-term geoelectric field monitoring is rarely performed. The installation of a new geoelectric monitoring system at the Boulder magnetic observatory of the US Geological Survey is summarized. Data from the system are expected, among other things, to be used for testing and validating algorithms for mapping North American geoelectric fields. An example time series of recorded electric and magnetic fields during a modest magnetic storm is presented. Based on our experience, we additionally present operational aspects of a successful geoelectric field monitoring system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baumbaugh, A.; Briegel, C.; Brown, B.C.
2011-11-01
A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. Themore » system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.« less
NASA Astrophysics Data System (ADS)
Baumbaugh, A.; Briegel, C.; Brown, B. C.; Capista, D.; Drennan, C.; Fellenz, B.; Knickerbocker, K.; Lewis, J. D.; Marchionni, A.; Needles, C.; Olson, M.; Pordes, S.; Shi, Z.; Still, D.; Thurman-Keup, R.; Utes, M.; Wu, J.
2011-11-01
A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. The system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musyurka, A. V., E-mail: musyurkaav@burges.rushydro.ru
This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.
New Seismic Monitoring Station at Mohawk Ridge, Valles Caldera
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, Peter Morse
Two new broadband digital seismic stations were installed in the Valles Caldera in 2011 and 2012. The first is located on the summit of Cerros del Abrigo (station code CDAB) and the second is located on the flanks of San Antonio Mountain (station code SAMT). Seismic monitoring stations in the caldera serve multiple purposes. These stations augment and expand the current coverage of the Los Alamos Seismic Network (LASN), which is operated to support seismic and volcanic hazards studies for LANL and northern New Mexico (Figure 1). They also provide unique continuous seismic data within the caldera that can bemore » used for scientific studies of the caldera’s substructure and detection of very small seismic signals that may indicate changes in the current and evolving state of remnant magma that is known to exist beneath the caldera. Since the installation of CDAB and SAMT, several very small earthquakes have already been detected near San Antonio Mountain just west of SAMT (Figure 2). These are the first events to be seen in that area. Caldera stations also improve the detection and epicenter determination quality for larger local earthquakes on the Pajarito Fault System east of the Preserve and the Nacimiento Uplift to the west. These larger earthquakes are a concern to LANL Seismic Hazards assessments and seismic monitoring of the Los Alamos region, including the VCNP, is a DOE requirement. Currently the next closest seismic stations to the caldera are on Pipeline Road (PPR) just west of Los Alamos, and Peralta Ridge (PER) south of the caldera. There is no station coverage near the resurgent dome, Redondo Peak, in the center of the caldera. Filling this “hole” is the highest priority for the next new LASN station. We propose to install this station in 2018 on Mohawk Ridge just east of Redondito, in the same area already occupied by other scientific installations, such as the MCON flux tower operated by UNM.« less
2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. Shanklin
2006-07-19
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less
2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. E. Shanklin
2007-02-14
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... temperature simulation devices. (v) Conduct a visual inspection of each sensor every quarter if redundant... simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and after every deviation. Accuracy audit methods include comparisons of sensor values with electronic signal simulations or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... temperature simulation devices. (v) Conduct a visual inspection of each sensor every quarter if redundant... simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and after every deviation. Accuracy audit methods include comparisons of sensor values with electronic signal simulations or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... temperature simulation devices. (v) Conduct a visual inspection of each sensor every quarter if redundant... simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and after every deviation. Accuracy audit methods include comparisons of sensor values with electronic signal simulations or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... temperature simulation devices. (v) Conduct a visual inspection of each sensor every quarter if redundant... signal simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and... signal simulations or via relative accuracy testing. (vi) Perform leak checks monthly. (vii) Perform...
Code of Federal Regulations, 2013 CFR
2013-07-01
... temperature simulation devices. (v) Conduct a visual inspection of each sensor every quarter if redundant... signal simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and... signal simulations or via relative accuracy testing. (vi) Perform leak checks monthly. (vii) Perform...
Code of Federal Regulations, 2012 CFR
2012-07-01
... temperature simulation devices. (v) Conduct a visual inspection of each sensor every quarter if redundant... signal simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and... signal simulations or via relative accuracy testing. (vi) Perform leak checks monthly. (vii) Perform...
40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... emissions are controlled with a common control device or series of control devices, are discharged to the... devices or multiple series of control devices are discharged to the atmosphere through more than one stack... control activities (including, as applicable, calibration checks and required zero and span adjustments...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... paragraphs (a) and (b)(1) through (8) of this section. (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a non-cryogenic temperature range, use a temperature sensor... value, whichever is larger. (3) For a cryogenic temperature range, use a temperature sensor with a...
40 CFR 60.13 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...
40 CFR 60.13 - Monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...
40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement sensitivity of 4 degrees Fahrenheit or 0.75 percent of the temperature value, whichever is larger. (iii) Shield the temperature sensor system from electromagnetic interference...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement sensitivity of 4 degrees Fahrenheit or 0.75 percent of the temperature value, whichever is larger. (iii) Shield the temperature sensor system from electromagnetic interference...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements in paragraphs (c)(3)(i) through (vii) of this section. (i) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement...) Shield the temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If...
40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...
40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements in paragraphs (c)(3)(i) through (vii) of this section. (i) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement...) Shield the temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If...
40 CFR 60.13 - Monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
40 CFR 63.127 - Transfer operations provisions-monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installed in the gas stream immediately before and after the catalyst bed. (2) Where a flare is used, a device (including but not limited to a thermocouple, infrared sensor, or an ultra-violet beam sensor... scrubber influent for liquid flow. Gas stream flow shall be determined using one of the procedures...
40 CFR 63.127 - Transfer operations provisions-monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installed in the gas stream immediately before and after the catalyst bed. (2) Where a flare is used, a device (including but not limited to a thermocouple, infrared sensor, or an ultra-violet beam sensor... scrubber influent for liquid flow. Gas stream flow shall be determined using one of the procedures...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Bruce A.; Bjornstad, Bruce N.; Lanigan, David C.
2006-03-29
This report supplies the information obtained during drilling, characterization, and installation of the new groundwater monitoring well. This document also provides a compilation of hydrogeologic and well construction information obtained during drilling, well development, and sample collection/analysis activities.
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Pollutants for Iron and Steel Foundries Continuous Compliance Requirements § 63.7741 What are the... eliminates pulsating pressure, vibration, and internal and external corrosion. (ii) Use a gauge with a... minimizes or eliminates pulsating pressure, vibration, and internal and external corrosion. (ii) Use a gauge...
40 CFR 60.274a - Monitoring of operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the equipment that is important to the performance of the total capture system (i.e., pressure sensors... this subpart shall check and record on a once-per-shift basis the furnace static pressure (if DEC system is in use, and a furnace static pressure gauge is installed according to paragraph (f) of this...
40 CFR 76.14 - Monitoring, recordkeeping, and reporting.
Code of Federal Regulations, 2014 CFR
2014-07-01
... installed NOX emission control system to the owner or operator showing that such system was designed to meet... performance of the NOX emission control system that were not included in the design specifications and... control system during the demonstration period. The tests shall include tests in § 76.15, which may be...
40 CFR 76.14 - Monitoring, recordkeeping, and reporting.
Code of Federal Regulations, 2013 CFR
2013-07-01
... installed NOX emission control system to the owner or operator showing that such system was designed to meet... performance of the NOX emission control system that were not included in the design specifications and... control system during the demonstration period. The tests shall include tests in § 76.15, which may be...
Acoustic Measurement Of Periodic Motion Of Levitated Object
NASA Technical Reports Server (NTRS)
Watkins, John L.; Barmatz, Martin B.
1992-01-01
Some internal vibrations, oscillations in position, and rotations of acoustically levitated object measured by use of microphone already installed in typical levitation chamber for tuning chamber to resonance and monitoring operation. Levitating acoustic signal modulated by object motion of lower frequency. Amplitude modulation detected and analyzed spectrally to determine amplitudes and frequencies of motions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Standards for Hazardous Air Pollutants for Source Categories: Generic Maximum Achievable Control Technology... operator of an existing source has installed best available control technology (BACT) (as defined in section 169(3) of the Act) or technology required to meet a lowest achievable emission rate (LAER) (as...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Standards for Hazardous Air Pollutants for Source Categories: Generic Maximum Achievable Control Technology... operator of an existing source has installed best available control technology (BACT) (as defined in section 169(3) of the Act) or technology required to meet a lowest achievable emission rate (LAER) (as...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Standards for Hazardous Air Pollutants for Source Categories: Generic Maximum Achievable Control Technology... operator of an existing source has installed best available control technology (BACT) (as defined in section 169(3) of the Act) or technology required to meet a lowest achievable emission rate (LAER) (as...
Code of Federal Regulations, 2014 CFR
2014-07-01
... accuracy that is traceable to National Institute of Standards and Technology (NIST) standards. (ii) The... section. (i) Perform a single-point calibration using an NIST-certified buffer solution that is accurate... include a redundant pH sensor, perform a single point calibration using an NIST-certified buffer solution...
Code of Federal Regulations, 2013 CFR
2013-07-01
... accuracy that is traceable to National Institute of Standards and Technology (NIST) standards. (ii) The... section. (i) Perform a single-point calibration using an NIST-certified buffer solution that is accurate... include a redundant pH sensor, perform a single point calibration using an NIST-certified buffer solution...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Standards for Hazardous Air Pollutants for Source Categories: Generic Maximum Achievable Control Technology... operator of an existing source has installed best available control technology (BACT) (as defined in section 169(3) of the Act) or technology required to meet a lowest achievable emission rate (LAER) (as...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards for Hazardous Air Pollutants for Source Categories: Generic Maximum Achievable Control Technology... operator of an existing source has installed best available control technology (BACT) (as defined in section 169(3) of the Act) or technology required to meet a lowest achievable emission rate (LAER) (as...
30 CFR 250.517 - Tubing and wellhead equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... pressure integrity and is otherwise suitable for its intended use. (b) In the event of prolonged operations... Manager. (c) When the tree is installed, you must equip wells to monitor for casing pressure according to... platform wells, the wellhead, all annuli (A, B, C, D, etc., annuli). (2) subsea wells, the tubing head, the...
40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... include a daily calibration drift assessment, a quarterly performance audit, and an annual zero alignment... performance audit, or an annual zero alignment audit. (7) You must calculate and record 6-minute averages from... absolute particulate matter loadings. (5) The bag leak detection system must be equipped with a device to...
40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... include a daily calibration drift assessment, a quarterly performance audit, and an annual zero alignment... performance audit, or an annual zero alignment audit. (7) You must calculate and record 6-minute averages from... absolute particulate matter loadings. (5) The bag leak detection system must be equipped with a device to...
40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... fossil fuel subcategory or the unit designed to burn heavy liquid subcategory and has an average annual heat input rate greater than 250 MMBtu per hour from solid fossil fuel and/or heavy liquid, and you... Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters Testing, Fuel...
40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... fossil fuel subcategory or the unit designed to burn heavy liquid subcategory and has an average annual heat input rate greater than 250 MMBtu per hour from solid fossil fuel and/or heavy liquid, and you... Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters Testing, Fuel...
40 CFR 60.13 - Monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operators of a CEMS installed in accordance with the provisions of this part, must check the zero (or low...) calibration drifts at least once daily in accordance with a written procedure. The zero and span must, as a minimum, be adjusted whenever either the 24-hour zero drift or the 24-hour span drift exceeds two times...
NASA Astrophysics Data System (ADS)
Morozov, Yegor; Tikhomirov, Alexander A.; Saltykov, Mikhail; Trifonov, Sergey V.; Kudenko, D.. Yurii A.
2016-07-01
An original method for "wet combustion" of organic wastes, which is being developed at the IBP SB RAS, is a very promising approach for regeneration of nutrient solutions for plants in future spacecraft closed Bioregenerative Life Support Systems (BLSS). The method is quick, ecofriendly, does not require special conditions such as high pressure and temperature, and the resulting nitrogen stays in forms easy for further preparation of the fertilizer. An experimental testbed of a new-generation closed ecosystem is being currently run at the IBP SB RAS to examine compatibility of the latest technologies for accelerating the cycling. Integration of "wet combustion" of organic wastes into the information system of closed ecosystem experimental testbed has been studied as part of preparatory work. Digital automation and real-time monitoring of original "wet combustion" installation operation parameters have been implemented. The new system enabled remotely controlled or automatic work of the installation. Data are stored in standard easily processed formats, allowing further mathematical processing where necessary. During ongoing experiments on improving "wet combustion" of organic wastes, automatic monitoring can notice slight changes in process parameters and record them in more detail. The ultimate goal of the study is to include the "wet combustion" installation into future full-scale experiment with humans, thus reducing the time spent by the crew on life support issues while living in the BLSS. The work was carried out with the financial support of the Russian Scientific Foundation (project 14-14-00599).
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
The drift velocity monitoring system of the CMS barrel muon chambers
NASA Astrophysics Data System (ADS)
Altenhöfer, Georg; Hebbeker, Thomas; Heidemann, Carsten; Reithler, Hans; Sonnenschein, Lars; Teyssier, Daniel
2018-04-01
The drift velocity is a key parameter of drift chambers. Its value depends on several parameters: electric field, pressure, temperature, gas mixture, and contamination, for example, by ambient air. A dedicated Velocity Drift Chamber (VDC) with 1-L volume has been built at the III. Phys. Institute A, RWTH Aachen, in order to monitor the drift velocity of all CMS barrel muon Drift Tube chambers. A system of six VDCs was installed at CMS and has been running since January 2011. We present the VDC monitoring system, its principle of operation, and measurements performed.
Protecting Against Damage from Refraction of High Power Microwaves in the DIII-D Tokamak
NASA Astrophysics Data System (ADS)
Lohr, John; Brambila, Rigo; Cengher, Mirela; Chen, Xi; Gorelov, Yuri; Grosnickle, William; Moeller, Charles; Ponce, Dan; Prater, Ron; Torrezan, Antonio; Austin, Max; Doyle, Edward; Hu, Xing; Dormier, Calvin
2017-07-01
Several new protective systems are being installed on the DIII D tokamak to increase the safety margins for plasma operations with injected ECH power at densities approaching cutoff. Inadvertent overdense operation has previously resulted in reflection of an rf beam back into a launcher causing extensive arcing and melt damage on one waveguide line. Damage to microwave diagnostics, which are located on the same side of the tokamak as the ECH launchers, also has occurred. Developing a reliable microwave based interlock to protect the many vulnerable systems in DIII-D has proved to be difficult. Therefore, multiple protective steps have been taken to reduce the risk of damage in the future. Among these is a density interlock generated by the plasma control system, with setpoint determined by the ECH operators based on rf beam trajectories and plasma parameters. Also installed are enhanced video monitoring of the launchers, and an ambient light monitor on each of the waveguide systems, along with a Langmuir probe at the mouth of each launcher. Versatile rf monitors, measuring forward and reflected power in addition to the mode content of the rf beams, have been installed as the last miter bends in each waveguide line. As these systems are characterized, they are being incorporated in the interlock chains, which enable the ECH injection permits. The diagnostics most susceptible to damage from the ECH waves have also been fitted with a variety of protective devices including stripline filters, thin resonant notch filters tuned to the 110 GHz injected microwave frequency, blazed grating filters and shutters. Calculations of rf beam trajectories in the plasmas are performed using the TORAY ray tracing code with input from kinetic profile diagnostics. Using these calculations, strike points for refracted beams on the vacuum vessel are calculated, which allows evaluation of the risk of damage to sensitive diagnostics and hardware.
Protecting against damage from refraction of high power microwaves in the DIII-D tokamak
Lohr, John; Brambila, Rigo; Cengher, Mirela; ...
2017-07-24
Here, several new protective systems are being installed on the DIII D tokamak to increase the safety margins for plasma operations with injected ECH power at densities approaching cutoff. Inadvertent overdense operation has previously resulted in reflection of an rf beam back into a launcher causing extensive arcing and melt damage on one waveguide line. Damage to microwave diagnostics, which are located on the same side of the tokamak as the ECH launchers, also has occurred. Developing a reliable microwave based interlock to protect the many vulnerable systems in DIII-D has proved to be difficult. Therefore, multiple protective steps havemore » been taken to reduce the risk of damage in the future. Among these is a density interlock generated by the plasma control system, with setpoint determined by the ECH operators based on rf beam trajectories and plasma parameters. Also installed are enhanced video monitoring of the launchers, and an ambient light monitor on each of the waveguide systems, along with a Langmuir probe at the mouth of each launcher. Versatile rf monitors, measuring forward and reflected power in addition to the mode content of the rf beams, have been installed as the last miter bends in each waveguide line. As these systems are characterized, they are being incorporated in the interlock chains, which enable the ECH injection permits. The diagnostics most susceptible to damage from the ECH waves have also been fitted with a variety of protective devices including stripline filters, thin resonant notch filters tuned to the 110 GHz injected microwave frequency, blazed grating filters and shutters. Calculations of rf beam trajectories in the plasmas are performed using the TORAY ray tracing code with input from kinetic profile diagnostics. Using these calculations, strike points for refracted beams on the vacuum vessel are calculated, which allows evaluation of the risk of damage to sensitive diagnostics and hardware.« less
Protecting against damage from refraction of high power microwaves in the DIII-D tokamak
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lohr, John; Brambila, Rigo; Cengher, Mirela
Here, several new protective systems are being installed on the DIII D tokamak to increase the safety margins for plasma operations with injected ECH power at densities approaching cutoff. Inadvertent overdense operation has previously resulted in reflection of an rf beam back into a launcher causing extensive arcing and melt damage on one waveguide line. Damage to microwave diagnostics, which are located on the same side of the tokamak as the ECH launchers, also has occurred. Developing a reliable microwave based interlock to protect the many vulnerable systems in DIII-D has proved to be difficult. Therefore, multiple protective steps havemore » been taken to reduce the risk of damage in the future. Among these is a density interlock generated by the plasma control system, with setpoint determined by the ECH operators based on rf beam trajectories and plasma parameters. Also installed are enhanced video monitoring of the launchers, and an ambient light monitor on each of the waveguide systems, along with a Langmuir probe at the mouth of each launcher. Versatile rf monitors, measuring forward and reflected power in addition to the mode content of the rf beams, have been installed as the last miter bends in each waveguide line. As these systems are characterized, they are being incorporated in the interlock chains, which enable the ECH injection permits. The diagnostics most susceptible to damage from the ECH waves have also been fitted with a variety of protective devices including stripline filters, thin resonant notch filters tuned to the 110 GHz injected microwave frequency, blazed grating filters and shutters. Calculations of rf beam trajectories in the plasmas are performed using the TORAY ray tracing code with input from kinetic profile diagnostics. Using these calculations, strike points for refracted beams on the vacuum vessel are calculated, which allows evaluation of the risk of damage to sensitive diagnostics and hardware.« less
Motor current signature analysis method for diagnosing motor operated devices
Haynes, Howard D.; Eissenberg, David M.
1990-01-01
A motor current noise signature analysis method and apparatus for remotely monitoring the operating characteristics of an electric motor-operated device such as a motor-operated valve. Frequency domain signal analysis techniques are applied to a conditioned motor current signal to distinctly identify various operating parameters of the motor driven device from the motor current signature. The signature may be recorded and compared with subsequent signatures to detect operating abnormalities and degradation of the device. This diagnostic method does not require special equipment to be installed on the motor-operated device, and the current sensing may be performed at remote control locations, e.g., where the motor-operated devices are used in accessible or hostile environments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-05-01
This operable unit consists of Sites 41 and 74. The remedial actions are designed to prevent future potential exposure by implementing institutional controls. These controls include: (1) designate the sites as `restricted` or `limited use` areas, within the base master plan; (2) prohibit the installation of potable water supply wells within the vicinity of the sites: and (3) implement a groundwater, surface water and sediment monitoring program.
NASA Technical Reports Server (NTRS)
Griffin, Timothy P.; Naylor, Guy R.; Haskell, William D.; Breznik, Greg S.; Mizell, Carolyn A.; Helms, William R.; Steinrock, T. (Technical Monitor)
2001-01-01
An on-line gas monitoring system was developed to replace the older systems used to monitor for cryogenic leaks on the Space Shuttles before launch. The system uses a mass spectrometer to monitor multiple locations in the process, which allows the system to monitor all gas constituents of interest in a nearly simultaneous manner. The system is fully redundant and meets all requirements for ground support equipment (GSE). This includes ruggedness to withstand launch on the Mobile Launcher Platform (MLP), ease of operation, and minimal operator intervention. The system can be fully automated so that an operator is notified when an unusual situation or fault is detected. User inputs are through personal computer using mouse and keyboard commands. The graphical user interface is very intuitive and easy to operate. The system has successfully supported four launches to date. It is currently being permanently installed as the primary system monitoring the Space Shuttles during ground processing and launch operations. Time and cost savings will be substantial over the current systems when it is fully implemented in the field. Tests were performed to demonstrate the performance of the system. Low limits-of-detection coupled with small drift make the system a major enhancement over the current systems. Though this system is currently optimized for detecting cryogenic leaks, many other gas constituents could be monitored using the Hazardous Gas Detection System (HGDS) 2000.
NASA Astrophysics Data System (ADS)
Nielsen, T. K.; Kjeldsen, M.
2010-08-01
Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower plant has performed during start ups, close downs and steady state operation. The data has for instance been used to verify the simulations of governor stability of the excising turbine.This will also secure the simulations done with an additional turbine installed.
Code of Federal Regulations, 2010 CFR
2010-07-01
... your CPMS for leakage. (7) If your CPMS is not equipped with a redundant pressure sensor, perform at... sensor. (6) At least monthly, check all mechanical connections on your CPMS for leakage. (7) If your CPMS... integrity, oxidation, and galvanic corrosion. (f) For each bag leak detection system, you must meet the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... the atmosphere. (ii) Car-seal or lock-and-key valve closures. Secure any bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. You must visually inspect the seal... sensor. (vii) At least monthly, inspect components for integrity and electrical connections for...
Code of Federal Regulations, 2012 CFR
2012-07-01
... device to the atmosphere. (ii) Car-seal or lock-and-key valve closures. Secure any bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. You must visually inspect... components for integrity and electrical connections for continuity, oxidation, and galvanic corrosion. (d...
Code of Federal Regulations, 2014 CFR
2014-07-01
... the atmosphere. (ii) Car-seal or lock-and-key valve closures. Secure any bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. You must visually inspect the seal... sensor. (vii) At least monthly, inspect components for integrity and electrical connections for...
Code of Federal Regulations, 2011 CFR
2011-07-01
... performance test deadline for PM CEMS. Relative accuracy testing for other CEMS need not be repeated if that... system. (i) Installation of the continuous monitoring system sampling probe or other interface at a... equipment specifications for the sample interface, the pollutant concentration or parametric signal analyzer...
40 CFR 60.47c - Emission monitoring for particulate matter.
Code of Federal Regulations, 2010 CFR
2010-07-01
... that elects not to install a COMS shall conduct a performance test using Method 9 of appendix A-4 of... operator shall conduct subsequent Method 9 of appendix A-4 of this part performance tests using the... performance test results. (i) If no visible emissions are observed, a subsequent Method 9 of appendix A-4 of...
40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or..., and validation check. (9) Except for redundant sensors, any device that is used to conduct an initial validation or accuracy audit of a CPMS must meet the accuracy requirements specified in paragraphs (f)(9)(i...
40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or..., and validation check. (9) Except for redundant sensors, any device that is used to conduct an initial validation or accuracy audit of a CPMS must meet the accuracy requirements specified in paragraphs (f)(9)(i...
Radiation Control on Uzbekistan Borders - Results and Perspectives
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petrenko, Vitaliy; Yuldashev, Bekhzod; Ismailov, Ulughbek
2009-12-02
The measures and actions on prevention, detection and response to criminal or unauthorized acts involving radioactive materials in Uzbekistan are presented. In frames of program of radiation monitoring to prevent illicit trafficking of nuclear and radioactive materials main customs border checkpoints were equipped with commercial radiation portal monitors. Special radiation monitors elaborated and manufactured in INP AS RU are installed in INP(main gates, research reactor and laboratory building) to provide nuclear security of Institute facilities. The experience of Uzbekistan in establishing radiation monitoring systems on its borders, their operation and maintenance would be useful for realization of proposed plan ofmore » strengthening measures to prevent illicit trafficking in Republics of Central Asia region.« less
Impact of PID on industrial rooftop PV-installations
NASA Astrophysics Data System (ADS)
Buerhop, Claudia; Fecher, Frank W.; Pickel, Tobias; Patel, Tirth; Zetzmann, Cornelia; Camus, Christian; Hauch, Jens; Brabec, Christoph J.
2017-08-01
Potential induced degradation (PID) causes severe damage and financial losses even in modern PV-installations. In Germany, approximately 19% of PV-installations suffer from PID and resulting power loss. This paper focuses on the impact of PID in real installations and how different evaluated time intervals influence the performance ratio (PR) and the determined degradation rate. The analysis focuses exemplarily on a 314 kWp PV-system in the Atlantic coastal climate. IR-imaging is used for identifying PID without operation interruption. Historic electric performance data are available from a monitoring system for several years on system level, string level as well as punctually measured module string IV- curves. The data sets are combined for understanding the PID behavior of this PV plant. The number of PID affected cells within a string varies strongly between 1 to 22% with the string position on the building complex. With increasing number of PID-affected cells the performance ratio decreases down to 60% for daily and monthly periods. Local differences in PID evolution rates are identified. An average PR-reduction of -3.65% per year is found for the PV-plant. On the string level the degradation rate varied up to 8.8% per year depending on the string position and the time period. The analysis reveals that PID generation and evolution in roof-top installations on industrial buildings with locally varying operation conditions can be fairly complex. The results yield that local operating conditions, e.g. ambient weather conditions as well as surrounding conditions on an industrial building, seem to have a dominating impact on the PID evolution rate.
Review of stand-alone photovoltaic application projects sponsored by US DOE and US AID
NASA Technical Reports Server (NTRS)
Bifano, W. J.
1981-01-01
Experience with dc photovoltaic systems (without backup power) and ranging in output from 23 to 3,500 peak watts, in a wide range of environmental conditions and with a wide range of insolation, is described. Cooperation of NASA with other government agencies resulted in the installation of an air pollution monitor in New Jersey, a seismic sensor in Hawaii, power for lookout towers in national forests in California, an electric power system for a Papago Indian village in Arizona, and a power system for a grain mill and water pump in Tangaye, Upper Volta. Significant operational results are discussed and system reliability is assessed for the 20 experimental systems installed since 1976. Additional systems to be installed overseas are highlighted, and economic factors are considered.
A New Remote Communications Link to Reduce Residential PV Solar Costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, Randy; Sugiyama, Rod
Monitoring of PV/DER site production is expensive to install and unreliable. Among third party systems providers, lost communications links are a growing concern. Nearly 20% of links are failing, provisioning is complex, recovery is expensive, production data is lost, and access is fragmented. FleetLink is a new concept in DER system communications, purpose built for lowering the cost of maintaining active contact with residential end user sites and ensuring that production data is reliably available to third party systems providers. Systems providers require accurate, secure system monitoring and reporting of production data and system faults while driving down overall costsmore » to compete effectively. This plug and play, independently operating communications solution lowers the cost of fleet contact from typically .08 dollars-$.12/W down to .02 dollars -.03/W including installation and maintenance expenses. FleetLink establishes a breakthrough in simplicity that facilitates rapid expansion of residential solar by reducing initial capital outlay and lowering installation labor time and skill levels. The solution also facilitates higher DER installation growth rates by driving down maintenance costs and eliminating communications trouble calls. This is accomplished by the FleetLink’s unique network technology that enables dynamic network configuration for fast changes, and active, self-healing DER site contact for uptime assurance. Using an open source network framework with proprietary, application specific enhancements, FleetLink independently manages connectivity, security, recovery, grid control communications, and fleet expansion while presenting a compliant SunSpec interface to the third party operations centers. The net system cost savings of at least .05 dollars/W supports the SunShot cost goals and the flexibility and scalability of the solution accelerates the velocity and ubiquitous adoption of solar.« less
NASA Astrophysics Data System (ADS)
Kopf, A.; Saffer, D. M.; Davis, E. E.; Araki, E.; Kinoshita, M.; Lauer, R. M.; Wheat, C. G.; Kitada, K.; Kimura, T.; Toczko, S.; Eguchi, N. O.; Science Parties, E.
2010-12-01
The IODP Nankai Trough Seismogenic Zone Experiment (NanTroSEIZE) is a multi-expedition drilling program designed to investigate fault mechanics, fault slip behavior, and strain accumulation along subduction megathrusts, through coring, logging, and long-term monitoring experiments. One key objective is the development and installation of a borehole observatory network extending from locations above the outer, presumably aseismic accretionary wedge to the seismogenic and interseismically locked plate interface, to record seismicity and slip transients, monitor strain accumulation, document hydraulic transients associated with deformation events, and quantify in situ pore fluid pressure and temperature. As part of recent NanTroSEIZE operations, borehole instruments have been developed for deployment at two sites: (1) Site C0010, which penetrates a major out-of-sequence thrust fault termed the “megasplay” at ca. 400 mbsf, and (2) Site C0002 in the Kumano forearc basin at a location that overlies both the updip edge of the inferred interseismically locked portion of the plate interface, and clusters of very low frequency thrust and reverse earthquakes located within the accretionary prism and potentially on the megasplay fault. In 2009, Site C0010 was drilled and cased with screens to access the megasplay fault, and a simple pore pressure and temperature monitoring system (a ”smartplug”) was installed. The simple observatory unit includes pressure and temperature sensors and a data logging package mounted beneath a mechanically set retrievable casing packer, and includes two pressure sensors, one in hydraulic communication with the formation through the casing screens below the packer, and the other to the open borehole above the packer to record hydrostatic reference pressure and ocean loading signals. Temperatures are recorded within the instrument package using a platinum thermometer and by a self-contained miniature temperature logger (MTL). In fall 2010, the smartplug will be retrieved and replaced with an upgraded instrument package that also includes an autonomous osmotic geochemical sampling system and microbial colonization experiment. Fall 2010 operations will also drill and case Site C0002 to ca. 1000 m depth and install a newly developed multi-sensor permanent observatory system, which includes a volumetric strainmeter, a broadband seismometer, tiltmeter, thermister string, and multi-level pore-pressure sensors. The strain, seismometer, and tilt sensors will be cemented with the basal mudstones of the Kumano basin, and pore pressure will be monitored within both the underlying accretionary prism and within the lower basin sediments. The observatory will ultimately be connected to the seafloor fiber-optic cable network DONET. Here, we report on the retrieval of the smartplug, installation and configuration of the new multi-sensor permanent observatory, and preliminary data obtained from the smartplug deployment.
Surface Infiltration Rates of Permeable Surfaces: Six Month ...
At the end of October 2009, EPA opened a parking lot on the Edison Environmental Center that included three parking rows of permeable pavement. The construction was a cooperative effort among EPA’s Office of Administration and Resources Management, National Risk Management Research Laboratory, and the facility owner, Region 2. The lot serves as an active parking area for facility staff and visitors and also as a research platform. Key unknowns in the application of green infrastructure include the long term performance and the maintenance requirements. The perceived uncertainty in these is a barrier to widespread adoption of the installation of permeable surfaces for stormwater management. EPA recognizes the need for credible long-term performance maintenance data and has begun a long-term monitoring effort on this installation. This document outlines the methods and results of the surface infiltration monitoring of the permeable parking surfaces during the first six months of operation. To inform the public.
Crack Monitoring of Operational Wind Turbine Foundations
McAlorum, Jack; Fusiek, Grzegorz; Niewczas, Pawel; McKeeman, Iain; Rubert, Tim
2017-01-01
The degradation of onshore, reinforced-concrete wind turbine foundations is usually assessed via above-ground inspections, or through lengthy excavation campaigns that suspend wind power generation. Foundation cracks can and do occur below ground level, and while sustained measurements of crack behaviour could be used to quantify the risk of water ingress and reinforcement corrosion, these cracks have not yet been monitored during turbine operation. Here, we outline the design, fabrication and field installation of subterranean fibre-optic sensors for monitoring the opening and lateral displacements of foundation cracks during wind turbine operation. We detail methods for in situ sensor characterisation, verify sensor responses against theoretical tower strains derived from wind speed data, and then show that measured crack displacements correlate with monitored tower strains. Our results show that foundation crack opening displacements respond linearly to tower strain and do not change by more than ±5 μm. Lateral crack displacements were found to be negligible. We anticipate that the work outlined here will provide a starting point for real-time, long-term and dynamic analyses of crack displacements in future. Our findings could furthermore inform the development of cost-effective monitoring systems for ageing wind turbine foundations. PMID:28825687
Crack Monitoring of Operational Wind Turbine Foundations.
Perry, Marcus; McAlorum, Jack; Fusiek, Grzegorz; Niewczas, Pawel; McKeeman, Iain; Rubert, Tim
2017-08-21
The degradation of onshore, reinforced-concrete wind turbine foundations is usually assessed via above-ground inspections, or through lengthy excavation campaigns that suspend wind power generation. Foundation cracks can and do occur below ground level, and while sustained measurements of crack behaviour could be used to quantify the risk of water ingress and reinforcement corrosion, these cracks have not yet been monitored during turbine operation. Here, we outline the design, fabrication and field installation of subterranean fibre-optic sensors for monitoring the opening and lateral displacements of foundation cracks during wind turbine operation. We detail methods for in situ sensor characterisation, verify sensor responses against theoretical tower strains derived from wind speed data, and then show that measured crack displacements correlate with monitored tower strains. Our results show that foundation crack opening displacements respond linearly to tower strain and do not change by more than ±5 μ m. Lateral crack displacements were found to be negligible. We anticipate that the work outlined here will provide a starting point for real-time, long-term and dynamic analyses of crack displacements in future. Our findings could furthermore inform the development of cost-effective monitoring systems for ageing wind turbine foundations.
New emission controls for Missouri batch-type charcoal kilns
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yronwode, P.; Graf, W.J.
1999-07-01
Charcoal kilns have been exempted from air emission regulation in the state of Missouri. Today, 80% of US charcoal production takes place in Missouri. As a result of a petition filed by people in the area around an installation in southern Missouri, the US Environmental Protection Agency (EPA) set up air monitors and measured ambient air levels at that charcoal manufacturing installation. These monitors yielded the highest particulate matter less than 10 micron (PM{sub 10}) levels ever recorded in the state. Earlier stack testing at another charcoal manufacturing installation indicated that toxics and carcinogens are present in charcoal kiln airmore » emissions. A Charcoal Kiln Workgroup was formed to determine the Best Available Control Technology (BACT) for charcoal kilns and to draft a charcoal kiln rule that requires BACT. The BACT report determined that afterburners were suitable for controlling emissions from batch-type charcoal kilns. In addition, the charcoal industry supported incorporating the BACT limits and requirements into an enforceable state rule and submitting this rule to the EPA for federal approval. A consent agreement between the EPA and three major charcoal companies was signed with provisions to install, operate, and maintain emission control devices on charcoal kilns. This agreement was to settle complaints alleging that the three major charcoal producers had failed to report toxic air emissions to federal and state regulators. The agreement provided that industry would install control devices on a set schedule with some charcoal kilns being shut down.« less
Monitoring relative humidity in RPC detectors by use of fiber optic sensors
NASA Astrophysics Data System (ADS)
Caponero, M. A.; Polimadei, A.; Benussi, L.; Bianco, S.; Colafranceschi, S.; Passamonti, L.; Piccolo, D.; Pierluigi, D.; Russo, A.; Felli, F.; Saviano, G.; Vendittozzi, C.
2013-03-01
We propose to adopt Fiber Bragg Grating technology to develop an innovative sensor for monitoring relative humidity of the gas fluxed in Resistive Plate Counters. Use of Fiber Bragg Grating as sensing device makes the proposed sensor well suited to develop distributed real-time monitoring systems to be installed on large volume detectors operated in high electromagnetic fields. In fact Fiber Bragg Gratings are fully immune from electromagnetic disturbances and allow simplified wiring by in-series interconnection of tens of them along a single optical fiber. In this paper we present results intended to investigate the feasibility of our proposal.
Honda, Kiyoshi; Shrestha, Aadit; Witayangkurn, Apichon; Chinnachodteeranun, Rassarin; Shimamura, Hiroshi
2009-01-01
The fieldserver is an Internet based observation robot that can provide an outdoor solution for monitoring environmental parameters in real-time. The data from its sensors can be collected to a central server infrastructure and published on the Internet. The information from the sensor network will contribute to monitoring and modeling on various environmental issues in Asia, including agriculture, food, pollution, disaster, climate change etc. An initiative called Sensor Asia is developing an infrastructure called Sensor Service Grid (SSG), which integrates fieldservers and Web GIS to realize easy and low cost installation and operation of ubiquitous field sensor networks. PMID:22574018
NASA Astrophysics Data System (ADS)
Mitsuzawa, K.; Goto, T.; Araki, E.; Watanabe, T.; Sugioka, H.; Kasaya, T.; Sayanagi, K.; Mikada, H.; Fujimoto, H.; Nagao, T.; Koizumi, K.; Asakawa, K.
2005-12-01
Western part of the Sagami Bay central Pacific side of Japan, is known as one of the high active tectonic areas. In this area, Teishi Knoll, volcanic seamount, erupted in 1989 and the earthquake swarms occurs repeatedly every few years in the eastern coast of the Izu Peninsula. The real-time deep sea floor observatory was deployed about 7 km off Hatsushima Island, Sagami Bay, at a depth of 1174 m in 1993 to monitor seismic activities, underwater pressure, water temperature and deep currents. The video camera and lights were also mounted in the observatory to monitor the relations among biological activities associated with the tectonic activities. The observation system including submarine electro-optical cable with a length of 8 km was completely renewed in 2000. The several underwater-mateable connectors are installed in the new observatory for additional observation instruments. A precise pressure sensor, ocean bottom gravity meter and ocean bottom electro-magnetic meter were installed using ROV Hyper-Dolphin in the cruise of R/V Natsushima from January 9 to 14, 2005. We start to operate them at February 10, 2005 after checking those of data qualities. We also installed an underwater internet interface, which is called Linux Box, as a prototype of underwater network system which was operated by Linux operating system. The Linux Box is a key network system for multidisciplinary observation network. It will be able to connect much kind of observation instruments as using internet connection. We put the precise pressure sensor as a sensor of the Linux Box in this experiment.
33 CFR 154.525 - Monitoring devices.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Monitoring devices. 154.525... Monitoring devices. The COTP may require the facility to install monitoring devices if the installation of monitoring devices at the facility would significantly limit the size of a discharge of oil or hazardous...
NASA Astrophysics Data System (ADS)
Chambers, J. E.; Meldrum, P.; Gunn, D.; Wilkinson, P. B.; Uhlemann, S.; Swift, R. T.; Kuras, O.; Inauen, C.; Hutchinson, D.; Butler, S.
2016-12-01
ERT monitoring has been demonstrated in numerous studies as an effective means of imaging near surface processes for applications as diverse as permafrost studies and contaminated land assessment. A limiting factor in applying time-lapse ERT for long-term studies in remote locations has been the availability of cost-effective ERT measurement systems designed specifically for monitoring applications. Typically, monitoring is undertaken using repeated manual data collection, or by building conventional survey instruments into a monitoring setup. The latter often requires high power and is therefore difficult to operate remotely without access to mains electricity. We describe the development of a low-power resistivity imaging system designed specifically for remote monitoring, taking advantage of, e.g., solar power and data telemetry. Here, we present the results of two field deployments. The system has been installed on an active railway cutting to provide insights into the effect of vegetation on the moisture dynamics in unstable infrastructure slopes and to gather subsurface information for pro-active remediation measures. The system, comprising 255 electrodes, acquires 4596 reciprocal measurement pairs twice daily during standard operation. In case of severe weather events, the measurement schedule is reactively changed, to gather high temporal resolution data to image rainfall infiltration processes. The system has also been installed along a leaking and marginally stable canal embankment; a less favourable location for remote monitoring, with limited solar power and poor mobile reception. Nevertheless, the acquired data indicated the effectiveness of remedial actions on the canal. The ERT results showed that one leak was caused by the canal and fixed during remediation, while two other "leaks" were shown to be effects of groundwater dynamics. The availability of cost-effective, low-power ERT monitoring instrumentation, combined with an automated workflow of data processing and visualisation, has the potential to contribute to a step-change in the management and early warning of slope instability.
Operating manual for the R100 digital vibration-time totalizer
Cordes, Edwin H.; Shi, Minghua
1988-01-01
A vibration sensor that monitors the running time of pumps to determine water withdrawal by various public-supply, agricultural, and industrial groups has been developed in response to a need demonstrated by data gathering activities of the U.S. Geological Survey 's National Water Use Information Program. This sensor, the R100 digital vibration-time totalizer, attaches to monitored equipment such as a pump, motor, or pipe facility and senses vibration to determine running time. Battery-powered and packaged for field environment, the R100 can be left unattended for up to 1 year. Time is recorded to the nearest 0.01 hour, or 36 seconds. This operating manual for the R100 digital vibration-time totalizer describes the R100 's principal of operation and gives installation guidelines and instructions for battery replacements. (USGS)
NASA Astrophysics Data System (ADS)
Filippov, A. V.; Tarasov, S. Yu.; Filippova, E. O.; Chazov, P. A.; Shamarin, N. N.; Podgornykh, O. A.
2016-11-01
Monitoring of the edge clamped workpiece deflection during milling has been carried our using acoustic emission, accelerometer and eddy current sensors. Such a monitoring is necessary in precision machining of vital parts used in air-space engineering where a majority of them made by milling. The applicability of the AE, accelerometers and eddy current sensors has been discussed together with the analysis of measurement errors. The appropriate sensor installation diagram has been proposed for measuring the workpiece elastic deflection exerted by the cutting force.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McGrath, W.J.; McNamara, M.M.
1981-10-01
The New York City Police Department (NYCPD) Automated Fuel Monitoring system is briefly described from the original study, through system design, to implementation. The system provides complete control of fuel usage for an agency with 4,000 motor vehicles and 25,000 vehicle operators. As far as is known, it is the largest system of its kind installed to date. The system can be scaled up or down to meet the needs of other governmental units. Estimated annual cost savings to NYCPD are $2,000,000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McGrath, W.J.; McNamara, M.M.
1981-11-16
The New York City Police Department (NYCPD) Automated Fuel Monitoring system is briefly described from the original study, through system design, to implementation. The system provides complete control of fuel usage for an agency with 4,000 motor vehicles and 25,000 vehicle operators. As far as is known, it is the largest system of its kind installed to date. The system can be scaled up or down to meet the needs of other governmental units. Estimated annual cost savings to NYCPD are $2,000,000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nawrocki, G.J.; Seaver, C.L.; Kowalkowski, J.B.
As controls needs at the Advanced Photon Source matured from an installation phase to an operational phase, the need to monitor the existing conventional facilities control system with the EPICS-based accelerator control system was realized. This existing conventional facilities control network is based on a proprietary system from Johnson Controls called Metasys. Initially read-only monitoring of the Metasys parameters will be provided; however, the ability for possible future expansion to full control is available. This paper describes a method of using commercially available hardware and existing EPICS software as a bridge between the Metasys and EPICS control systems.
Freifeld, Barry; Daley, Tom; Cook, Paul; ...
2014-12-31
Understanding the impacts caused by injection of large volumes of CO 2 in the deep subsurface necessitates a comprehensive monitoring strategy. While surface-based and other remote geophysical methods can provide information on the general morphology of a CO 2 plume, verification of the geochemical conditions and validation of the remote sensing data requires measurements from boreholes that penetrate the storage formation. Unfortunately, the high cost of drilling deep wellbores and deploying instrumentation systems constrains the number of dedicated monitoring borings as well as limits the technologies that can be incorporated in a borehole completion. The objective of the Modular Boreholemore » Monitoring (MBM) Program was to develop a robust suite of well-based tools optimized for subsurface monitoring of CO 2 that could meet the needs of a comprehensive well-based monitoring program. It should have enough flexibility to be easily reconfigured for various reservoir geometries and geologies. The MBM Program sought to provide storage operators with a turn-key fully engineered design that incorporated key technologies, function over the decades long time-span necessary for post-closure reservoir monitoring, and meet industry acceptable risk profiles for deep-well installations. While still within the conceptual design phase of the MBM program, the SECARB Anthropogenic Test in Citronelle, Alabama, USA was identified as a deployment site for our engineered monitoring systems. The initial step in designing the Citronelle MBM system was to down-select from the various monitoring tools available to include technologies that we considered essential to any program. Monitoring methods selected included U-tube geochemical sampling, discrete quartz pressure and temperature gauges, an integrated fibre-optic bundle consisting of distributed temperature and heat-pulse sensing, and a sparse string of conventional 3C-geophones. While not originally planned within the initial MBM work scope, the fibre-optic cable was able to also be used for the emergent technology of distributed acoustic sensing. The MBM monitoring string was installed in March, 2012. To date, the Citronelle MBM instruments continue to operate reliably. Results and lessons learned from the Citronelle MBM deployment are addressed along with examples of data being collected.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baranowski, S.T.; Culp, L.R.; Jonas, T.S.
1995-12-31
The Clean Air Act Amendments of 1990 require all Phase 1 and 2 utilities to install Continuous Emissions Monitoring Systems (CEMS), which can consist of instrumentation including analyzers and a Data Acquisition and Handling System (DAHS). To meet these requirements, Basin Electric Power Cooperative contracted with Black and Veatch to design and develop a DAHS which would meet all 40 CFR Part 75 requirements. Basin Electric provided the specifications for the DAHS and the graphical user interface, and B and V designed, developed, and installed a DAHS at 3 units at Laramie River Station, 2 units at Antelope Valley Station,more » and 2 units at Leland Olds Station. B and V utilized the existing equipment, adding to it a unique DAHS design. B and V designed and implemented the DAHS which operates in the OS/2 environment to interface with multiple programmable logic controllers. This unique software was written in modular form so that multiple programs run in unison, monitoring each other for errors to ensure continuous operation. The reporting structure is flexible to allow for a variety of formats, including those specifically required by the state to meet CAAA guidelines. Today, these seven units are in operation and comply with the CAAA. This paper describes the issues faced during specification, general design, compliance, and implementation of the DAHS at BEPC, including the lessons learned. The continuous emissions monitoring (CEM) system for each unit at BEPC consisted of a set of dilution probe analyzers for measuring SO{sub 2}, NO{sub x}, and CO{sub 2}.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, David E.
The JEMA modulator was originally developed for the European Spallation Source (ESS) when Spain was under consideration as a location for the ESS facility. Discussions ensued and the Spallation Neutron Source Research Accelerator Division agreed to form a collaboration with ESS-Bilbao (ESS-B) consortium to provide services for specifying the requirements for a version of the modulator capable of operating twelve 550 kW klystrons, monitoring the technical progress on the contract with JEMA, installing and commissioning the modulator at SNS, and performing a 30 day full power test. This work was recently completed, and this report discusses those activities with primarymore » emphasis on the installation and testing activities.« less
Satellite relay telemetry of seismic data in earthquake prediction and control
Jackson, Wayne H.; Eaton, Jerry P.
1971-01-01
The Satellite Telemetry Earthquake Monitoring Program was started in FY 1968 to evaluate the applicability of satellite relay telemetry in the collection of seismic data from a large number of dense seismograph clusters laid out along the major fault systems of western North America. Prototype clusters utilizing phone-line telemetry were then being installed by the National Center for Earthquake Research (NCER) in 3 regions along the San Andreas fault in central California; and the experience of installing and operating the clusters and in reducing and analyzing the seismic data from them was to provide the raw materials for evaluation in the satellite relay telemetry project.
Diagnostic Systems Plan for the Advanced Light Source Top-OffUpgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barry, Walter; Chin, Mike; Robin, David
2005-05-10
The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations [1], in which electrons are quasi-continuously injected to produce constant stored beam current. The upgrade is structured in two phases. First, we will upgrade our injector from 1.5 GeV to 1.9 GeV to allow full energy injection and will start top-off operations. In the second phase, we will upgrade the Booster Ring (BR) with a bunch cleaning system to allow high bunch purity top-off injection. A diagnostics upgrade will be crucial for success in both phases of the top-off project, and our plan for it is describedmore » in this paper. New booster ring diagnostics will include updated beam position monitor (BPM) electronics, a tune monitoring system, and a new scraper. Two new synchrotron light monitors and a beam stop will be added to the booster-to-storage ring transfer line (BTS), and all the existing beam current monitors along the accelerator chain will be integrated into a single injection efficiency monitoring application. A dedicated bunch purity monitor will be installed in the storage ring (SR). Together, these diagnostic upgrades will enable smooth commissioning of the full energy injector and a quick transition to high quality top-off operation at the ALS.« less
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... valid hour of data. (2) You must have valid data from at least 90 percent of the hours during which the... three of four equally spaced data values from that hour from a continuous monitoring system (CMS) that... that period using only average values that are based on valid data (i.e., not from out-of-control...
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2011 CFR
2011-07-01
... valid hour of data. (2) You must have valid data from at least 90 percent of the hours during which the... three of four equally spaced data values from that hour from a continuous monitoring system (CMS) that... that period using only average values that are based on valid data (i.e., not from out-of-control...
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2010 CFR
2010-07-01
... paragraphs (a)(1)(i) through (iv) of this section. (i) Locate the flow sensor and other necessary equipment... sensor with a minimum measurement sensitivity of 2 percent of the flow rate. (iii) Conduct a flow sensor... paragraphs (a)(2)(i) through (vi) of this section. (i) Locate the pressure sensor(s) in or as close as...
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2012 CFR
2012-07-01
... paragraphs (a)(1)(i) through (iv) of this section. (i) Locate the flow sensor and other necessary equipment... sensor with a minimum measurement sensitivity of 2 percent of the flow rate. (iii) Conduct a flow sensor... paragraphs (a)(2)(i) through (vi) of this section. (i) Locate the pressure sensor(s) in or as close as...
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2014 CFR
2014-07-01
... paragraphs (a)(1)(i) through (iv) of this section. (i) Locate the flow sensor and other necessary equipment... sensor with a minimum measurement sensitivity of 2 percent of the flow rate. (iii) Conduct a flow sensor... paragraphs (a)(2)(i) through (vi) of this section. (i) Locate the pressure sensor(s) in or as close as...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., viscosity, and percent water content. The condemning limits for these parameters are as follows: Total Base Number is less than 30 percent of the Total Base Number of the oil when new; viscosity of the oil has changed by more than 20 percent from the viscosity of the oil when new; or percent water content (by...
1998-06-25
KENNEDY SPACE CENTER, FLA. -- Sgt. Mark Hines, of Kennedy Space Center (KSC) Security, checks out equipment used to operate the Forward Looking Infrared Radar (FLIR) installed on NASA's Huey UH-1 helicopter. The helicopter has also been outfitted with a portable global positioning satellite (GPS) system to support Florida's Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. The FLIR includes a beach ball-sized infrared camera that is mounted on the helicopter's right siderail and a real-time television monitor and recorder installed inside. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. KSC's security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter
1998-06-25
KENNEDY SPACE CENTER, FLA. -- NASA's Huey UH-1 helicopter lands at the Shuttle Landing Facility to pick up Kennedy Space Center (KSC) Security personnel who operate the Forward Looking Infrared Radar (FLIR) installed on board. The helicopter has also been outfitted with a portable global positioning satellite (GPS) system to support Florida's Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. The FLIR includes a beach ball-sized infrared camera that is mounted on the helicopter's right siderail and a real-time television monitor and recorder installed inside. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. KSC's security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter
CHAIN-project and installation of the flare monitoring telescopes in developing countries
NASA Astrophysics Data System (ADS)
Ueno, Satoru; Shibata, Kazunari; Kimura, Goichi; Nakatani, Yoshikazu; Kitai, Reizaburo; Nagata, Shin'ichi
2007-12-01
The Flare Monitoring Telescope (FMT) was constructed in 1992 at the Hida Observatory in Japan to investigate the long-term variation of solar activity and explosive events, as a project of the international coordinated observations programme (STEP). The FMT consists of five solar imaging telescopes and one guide telescope. The five telescopes simultaneously observe the full-disk Sun at different wavelengths around H-alpha absorption line or in different modes. Therefore, the FMT can measure the three-dimensional velocity field of moving structures on the full solar disk without the atmospheric seeing effect. The science target of the FMT is to monitor solar flares and erupting filaments continuously all over the solar disk and as many events as possible and to investigate the relationship between such phenomena and space weather. Now we are planning to start a new worldwide project called as ``Continuous H-alpha Imaging Network (CHAIN)-project''. As part of this project, we are examining the possibility of installing telescopes similar to the FMT in developing countries with cooperative help by the United Nations. We have selected Peru as the candidate country where the first oversea FMT will be installed, and are beginning to study the natural environment, the seeing conditions, the proper design of the telescope for Peru and the training and education programme of operating staff, etc.
NASA Astrophysics Data System (ADS)
Vivas Veloso, J. A.; Christie, D. R.; Hoffmann, T. L.; Campus, P.; Bell, M.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.; Wu, Sean F.
2002-11-01
The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network, to repair faulty equipment, and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network, this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently, 11 of the 60 IMS infrasound stations are transmitting data in the post-installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post-certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post-installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost-efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations, as well as Configuration Management and Network Sustainment.
Polycrystalline CdTe detectors: A luminosity monitor for the LHC
NASA Astrophysics Data System (ADS)
Gschwendtner, E.; Placidia, M.; Schmicklera, H.
2003-09-01
The luminosity at the four interaction points of the Large Hadron Collider must be continuously monitored in order to provide an adequate tool for the control and optimization of the collision parameters and the beam optics. At both sides of the interaction points absorbers are installed to protect the super-conducting accelerator elements from quenches caused by the deposited energy of collision products. The luminosity detectors will be installed in the copper core of these absorbers to measure the electromagnetic and hadronic showers caused by neutral particles that are produced at the proton-proton collision in the interaction points. The detectors have to withstand extreme radiation levels (108 Gy/yr at the design luminosity) and their long-term operation has to be assured without requiring human intervention. In addition the demand for bunch-by-bunch luminosity measurements, i.e. 40 MHz detection speed, puts severe constraints on the detectors. Polycrystalline CdTe detectors have a high potential to fulfill the requirements and are considered as LHC luminosity monitors. In this paper the interaction region is shown and the characteristics of the CdTe detectors are presented.
Chang, Liang-Cheng; Lee, Da-Sheng
2012-01-01
Installation of a Wireless and Powerless Sensing Node (WPSN) inside a spindle enables the direct transmission of monitoring signals through a metal case of a certain thickness instead of the traditional method of using connecting cables. Thus, the node can be conveniently installed inside motors to measure various operational parameters. This study extends this earlier finding by applying this advantage to the monitoring of spindle systems. After over 2 years of system observation and optimization, the system has been verified to be superior to traditional methods. The innovation of fault diagnosis in this study includes the unmatched assembly dimensions of the spindle system, the unbalanced system, and bearing damage. The results of the experiment demonstrate that the WPSN provides a desirable signal-to-noise ratio (SNR) in all three of the simulated faults, with the difference of SNR reaching a maximum of 8.6 dB. Following multiple repetitions of the three experiment types, 80% of the faults were diagnosed when the spindle revolved at 4,000 rpm, significantly higher than the 30% fault recognition rate of traditional methods. The experimental results of monitoring of the spindle production line indicated that monitoring using the WPSN encounters less interference from noise compared to that of traditional methods. Therefore, this study has successfully developed a prototype concept into a well-developed monitoring system, and the monitoring can be implemented in a spindle production line or real-time monitoring of machine tools. PMID:22368456
Chang, Liang-Cheng; Lee, Da-Sheng
2012-01-01
Installation of a Wireless and Powerless Sensing Node (WPSN) inside a spindle enables the direct transmission of monitoring signals through a metal case of a certain thickness instead of the traditional method of using connecting cables. Thus, the node can be conveniently installed inside motors to measure various operational parameters. This study extends this earlier finding by applying this advantage to the monitoring of spindle systems. After over 2 years of system observation and optimization, the system has been verified to be superior to traditional methods. The innovation of fault diagnosis in this study includes the unmatched assembly dimensions of the spindle system, the unbalanced system, and bearing damage. The results of the experiment demonstrate that the WPSN provides a desirable signal-to-noise ratio (SNR) in all three of the simulated faults, with the difference of SNR reaching a maximum of 8.6 dB. Following multiple repetitions of the three experiment types, 80% of the faults were diagnosed when the spindle revolved at 4,000 rpm, significantly higher than the 30% fault recognition rate of traditional methods. The experimental results of monitoring of the spindle production line indicated that monitoring using the WPSN encounters less interference from noise compared to that of traditional methods. Therefore, this study has successfully developed a prototype concept into a well-developed monitoring system, and the monitoring can be implemented in a spindle production line or real-time monitoring of machine tools.
Application of ion-sensitive sensors in water quality monitoring.
Winkler, S; Rieger, L; Saracevic, E; Pressl, A; Gruber, G
2004-01-01
Within the last years a trend towards in-situ monitoring can be observed, i.e. most new sensors for water quality monitoring are designed for direct installation in the medium, compact in size and use measurement principles which minimise maintenance demand. Ion-sensitive sensors (Ion-Sensitive-Electrode--ISE) are based on a well known measurement principle and recently some manufacturers have released probe types which are specially adapted for application in water quality monitoring. The function principle of ISE-sensors, their advantages, limitations and the different methods for sensor calibration are described. Experiences with ISE-sensors from applications in sewer networks, at different sampling points within wastewater treatment plants and for surface water monitoring are reported. An estimation of investment and operation costs in comparison to other sensor types is given.
Electricity Submetering on the Cheap: Stick-on Electricity Meters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lanzisera, Steven; Lorek, Michael; Pister, Kristofer
2014-08-17
We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less
Continuous AE crack monitoring of a dissimilar metal weldment at Limerick Unit 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hutton, P.H.; Friesel, M.A.; Dawson, J.F.
1993-12-01
Acoustic emission (AE) technology for continuous surveillance of a reactor component(s) to detect crack initiation and/or crack growth has been developed at Pacific Northwest Laboratory (PNL). The technology was validated off-reactor in several major tests, but it had not been validated by monitoring crack growth on an operating reactor system. A flaw indication was identified during normal inservice inspection of piping at Philadelphia Electric Company (PECO) Limerick Unit 1 reactor during the 1989 refueling outage. Evaluation of the flaw indication showed that it could remain in place during the subsequent fuel cycle without compromising safety. The existence of this flawmore » indication offered a long sought opportunity to validate AE surveillance to detect and evaluate crack growth during reactor operation. AE instrumentation was installed by PNL and PECO to monitor the flaw indication during two complete fuel cycles. This report discusses the results obtained from the AE monitoring over the period May 1989 to March 1992 (two fuel cycles).« less
OZONE MONITORING, MAPPING, AND PUBLIC OUTREACH ...
The U.S. EPA had developed a handbook to help state and local government officials implement ozone monitoring, mapping, and outreach programs. The handbook, called Ozone Monitoring, Mapping, and Public Outreach: Delivering Real-Time Ozone Information to Your Community, provides step-by-step instructions on how to: Design, site, operate, and maintain an ozone monitoring network. Install, configure, and operate the Automatic Data Transfer System Use MapGen software to create still-frame and animated ozone maps. Develop and outreach plan to communicate information about real-time ozone levels and their health effects to the public.This handbook was developed by EPA's EMPACT program. The program takes advantage of new technologies that make it possible to provide environmental information to the public in near real time. EMPACT is working with the 86 largest metropolitan areas of the country to help communities in these areas: Collect, manage and distribute time-relevant environmental information. Provide their residents with easy-to-understand information they can use in making informed, day-to-day decisions. Information
NASA Astrophysics Data System (ADS)
Dolci, Mauro; Valentini, Angelo; Tavagnacco, Daniele; Di Cianno, Amico; Straniero, Oscar
2016-08-01
The Antarctic Plateau is one of the best observing sites on Earth, especially for infrared astronomy. The extremely low temperatures (down to -80°C), the low pressure (around 650 mbar) and the very dry atmosphere (PWV less than 1 mm) allow for a very clear and dark sky, as well as for a very low instrumental background. These unique properties, however, make it also very difficult to install and operate astronomical instrumentation. AMICA (Antarctic Multiband Infrared CAmera) is an instrument especially designed for Antarctic operation, whose installation at Dome C has been completed in 2013. Since then it has been continuously working over the last five years, monitoring and controlling in particular the environmental and operating conditions through a dedicated application, its Environmental Control System (ECS). The recorded behavior of AMICA highlighted a set of peculiar aspects of the site that are hard to consider a priori. Although mechanical and electronic COTS components can reliably work in thermally insulated and controlled boxes, simple insulation causes their overheating because of the air dryness and rarefaction which make the heat transfer extremely inefficient. Heat removal is also a real problem when managing heavy-duty devices like cryocoolers, whose excess power removal needs to be fast and efficient. Finally, the lack of an electrical ground generates a wide variety of transient electrical and electromagnetic phenomena which often make electronic instrumentation very unstable. A list of new recommendations is therefore presented, as a guideline for future astronomical instruments operating in Antarctica.
Monitoring real-time navigation processes using the automated reasoning tool (ART)
NASA Technical Reports Server (NTRS)
Maletz, M. C.; Culbert, C. J.
1985-01-01
An expert system is described for monitoring and controlling navigation processes in real-time. The ART-based system features data-driven computation, accommodation of synchronous and asynchronous data, temporal modeling for individual time intervals and chains of time intervals, and hypothetical reasoning capabilities that consider alternative interpretations of the state of navigation processes. The concept is illustrated in terms of the NAVEX system for monitoring and controlling the high speed ground navigation console for Mission Control at Johnson Space Center. The reasoning processes are outlined, including techniques used to consider alternative data interpretations. Installation of the system has permitted using a single operator, instead of three, to monitor the ascent and entry phases of a Shuttle mission.
Monitoring of Carrying Cable in the Well by Electric Drive of Winch at the Logging Works
NASA Astrophysics Data System (ADS)
Odnokopylov, I. G.; Gneushev, V. V.; Larioshina, I. A.
2016-01-01
Emergency situations during logging operations are considered. The necessity of monitoring of the carrying cable in the well was shown, especially at the jet perforation and seismic researches of wells. The way of monitoring of logging cable and geophysical probe by means of the electric drive of tripping works of the logging winch is offered. This method allows timely to identify the wedges of geophysical equipment and the tension of the cable in well without interfering into construction of logging installation by means of algorithmic processing of sensors of electric drive. Research was conducted on the simulation model; these results indirectly confirm the possibility of using of electric drive for monitoring of downhole equipment.
NASA Astrophysics Data System (ADS)
Arosio, Diego; Munda, Stefano; Tresoldi, Greta; Papini, Monica; Longoni, Laura; Zanzi, Luigi
2017-10-01
This work is based on the assumption that a resistivity meter can effectively monitor water saturation in earth levees and can be used as a warning system when saturation exceeds the expected seasonal maxima. We performed time-lapse ERT measurements to assess the capability of this method to detect areas where seepage is critical. These measurements were also very useful to design a prototype monitoring system with remarkable savings by customizing the specifications according to field observations. The prototype consists of a remotely controlled low-power resistivity meter with a spread of 48 stainless steel 20 × 20 cm plate electrodes buried at half-meter depth. We deployed the newly-designed permanent monitoring system on a critical levee segment. A weather station and an ultrasonic water level sensor were also installed in order to analyse the correlation of resistivity with temperature, rainfalls and water level seasonal variations. The preliminary analysis of the monitoring data shows that the resistivity maps follow a very reasonable trend related with the saturation/drying cycle of the levee caused by the seasonal variations of the water level in the irrigation channel. Sharp water level changes cause delayed and smooth resistivity variations. Rainfalls and, to a lesser extent, temperature seem to have an influence on the collected data but effects are apparently negligible beyond 1 m depth. The system is currently operating and results are continuously monitored.
Delivering images to the operating room: a web-based solution.
Bennett, W F; Tunstall, K M; Skinner, P W; Spigos, D G
2002-01-01
As radiology departments become filmless, they are discovering that some areas are particularly difficult to deliver images. Many departments have found that the operating room is one such area. There are space constraints and difficulty in manipulating the images by a sterile surgeon. This report describes one method to overcome this obstacle. The author's institution has been using picture archiving and communication system (PACS) for approximately 3 years, and it has been a filmless department for 1 year. The PACS transfers images to a webserver for distribution throughout the hospital. It is accessed by Internet Explorer without any additional software. The authors recently started a pilot program in which they installed dual panel flat screen monitors in 6 operating rooms. The computers are connected to the hospital backbone by ethernet. Graphic cards installed in the computers allow the use of dual monitors. Because the surgeons were experienced in viewing cases on the enterprise web system, they had little difficulty in adapting to the operating room (OR) system. Initial reception of the system is positive. The use of the web system was found to be superior by the surgeons because of the flexibility and manipulation of the images compared with film. Images can be magnified to facilitate viewing from across the room. The ultimate goal of electronic radiology is to replace hardcopy film in all aspects. One area that PACS has difficulty in accomplishing this goal is in the operating room. Most institutions have continued to print film for the OR. The authors have initiated a project that may allow web viewing in the OR. Because of limited space in the OR, an additional computer was undesirable. The CPU tower, keyboard, and mouse were mounted on a frame on the wall. The images were displayed on 2 flat screen monitors, which simulated the viewboxes traditionally used by the surgeons. Interviews with the surgeons have found both positive and negative aspects of the system. Overall impression is good, but the timeliness of the intraoperative films needs to be improved. The author's pilot project of installing a web-based display system in the operating room still is being evaluated. Their initial results have been positive, and if there are no major problems that arise the project will be expanded. These results show that it is possible to provide image delivery to the OR over the intranet that is acceptable to the surgeons.
Rutz, Gary L.; Sholtis, Matthew D.; Adams, Noah S.; Beeman, John W.
2014-01-01
Acoustic telemetry equipment was installed at three sites in the Willamette River during October 2012 to test the effectiveness of using the Juvenile Salmon Acoustic Telemetry System to monitor the movements of fish in a high-flow, high-velocity riverine environment. Hydrophones installed on concrete blocks were placed on the bottom of the river, and data cables were run from the hydrophones to shore where they were attached to anchor points. Under relatively low-flow conditions (less than approximately 10,000 cubic feet per second) the monitoring system remained in place and could be used to detect tagged fish as they traveled downstream during their seaward migration. At river discharge over approximately 10,000 cubic feet per second, the hydrophones were damaged and cables were lost because of the large volume of woody debris in the river and the increase in water velocity. Damage at two of the sites was sufficient to prevent data collection. A limited amount of data was collected from the equipment at the third site. Site selection and deployment strategies were re-evaluated, and an alternate deployment methodology was designed for implementation in 2013.
Sensor4PRI: A Sensor Platform for the Protection of Railway Infrastructures
Cañete, Eduardo; Chen, Jaime; Díaz, Manuel; Llopis, Luis; Rubio, Bartolomé
2015-01-01
Wireless Sensor Networks constitute pervasive and distributed computing systems and are potentially one of the most important technologies of this century. They have been specifically identified as a good candidate to become an integral part of the protection of critical infrastructures. In this paper we focus on railway infrastructure protection and we present the details of a sensor platform designed to be integrated into a slab track system in order to carry out both installation and maintenance monitoring activities. In the installation phase, the platform helps operators to install the slab tracks in the right position. In the maintenance phase, the platform collects information about the structural health and behavior of the infrastructure when a train travels along it and relays the readings to a base station. The base station uses trains as data mules to upload the information to the internet. The use of a train as a data mule is especially suitable for collecting information from remote or inaccessible places which do not have a direct connection to the internet and require less network infrastructure. The overall aim of the system is to deploy a permanent economically viable monitoring system to improve the safety of railway infrastructures. PMID:25734648
NASA Astrophysics Data System (ADS)
Cawley, Peter
2014-03-01
There is a gradual shift in emphasis from periodic inspection with detachable transducers (NDT) to permanently installed monitoring systems giving information about the structural integrity at pre-programmed intervals or on demand (SHM). The drivers of this change are discussed, together with the requirements of successful SHM systems. Particular issues are that NDT often involves scanning and this is not possible with typical SHM configurations; it therefore becomes important to cover a significant area of structure from each transducer position. Guided waves provide a possible solution to this problem and permanently installed guided wave pipe inspection systems are now available. The sensitivity obtained with a permanently installed system is significantly better than that in a one-off test as baseline subtraction can be employed. However, this is far from trivial as it is necessary to compensate for benign changes such as temperature. The guided wave technique does not provide accurate remaining thickness information and is best complemented by point measurements at selected locations. Another issue is that the SHM transducers must survive in operational conditions, which is particularly difficult at high temperatures. Recent work at Imperial College and associated spin-out companies on solutions to these problems is discussed.
NASA Technical Reports Server (NTRS)
Romero, Raylund; Summers, Harold; Cronkhite, James
1996-01-01
The objective was to evaluate the feasibility of a state-of-the-art health and usage monitoring system (HUMS) to provide monitoring of critical mechanical systems on the helicopter, including motors, drive train, engines, and life-limited components. The implementation of HUMS and cost integration with current maintenance procedures was assessed from the operator's viewpoint in order to achieve expected benefits from these systems, such as enhanced safety, reduced maintenance cost, and increased availability. An operational HUMS that was installed and operated under an independent flight trial program was used as a basis for this study. The HUMS equipment and software were commercially available. Based on the results of the feasibility study, the HUMS used in the flight trial program generally demonstrated a high level of reliability in monitoring the rotor system, engines, drive train, and life-limited components. The system acted as a sentinel to warn of impending failures. A worn tail rotor pitch bearing was detected by HUMS, which had the capability for self testing to diagnose system and sensor faults. Examples of potential payback to the operator with HUMS were identified, including reduced insurance cost through enhanced safety, lower operating costs derived from maintenance credits, increased aircraft availability, and improved operating efficiency. The interfacing of HUMS with current operational procedures was assessed to require only minimal revisions to the operator's maintenance manuals. Finally the success in realizing the potential benefits from HUMS technology was found to depend on the operator, helicopter manufacturer, regulator (FAA), and HUMS supplier working together.
Multi-static Serial LiDAR for Surveillance and Identification of Marine Life at MHK Installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alsenas, Gabriel; Dalgleish, Fraser; Ouyang, Bing
Final Report for project DE-EE0006787: Multi-static Serial LiDAR for Surveillance and Identification of Marine Life at MHK Installations. This project developed and tested an optical monitoring system prototype that will be suitable for marine and hydrokinetic (MHK) full project lifecycle observation (baseline, commissioning, and decommissioning), with automated real-time classification of marine animals. This system can be deployed to collect pre-installation baseline species observations at a proposed deployment site with minimal post-processing overhead. To satisfy deployed MHK project species of concern (e.g. Endangered Species Act-listed) monitoring requirements, the system provides automated tracking and notification of the presence of managed animals withinmore » established perimeters of MHK equipment and provides high resolution imagery of their behavior through a wide range of conditions. During a project’s decommissioning stage, the system can remain installed to provide resource managers with post-installation data. Our technology, known as an Unobtrusive Multi-static Serial LiDAR Imager (UMSLI), is a technology transfer of underwater distributed LiDAR imaging technology that preserves the advantages of traditional optical and acoustic solutions while overcoming associated disadvantages for MHK environmental monitoring applications. This new approach is a purposefully-designed, reconfigurable adaptation of an existing technology that can be easily mounted on or around different classes of MHK equipment. The system uses low average power red (638nm) laser illumination to be invisible and eye-safe to marine animals and is compact and cost effective. The equipment is designed for long term, maintenance-free operations, to inherently generate a sparse primary dataset that only includes detected anomalies (animal presence information), and to allow robust real-time automated animal classification/identification with a low data bandwidth requirement. Advantages of the technology over others currently being used or being considered for MHK monitoring include: Unlike a conventional camera, the depth of field is near-infinite and limited by attenuation (approximately 5-8 m) rather than focal properties of a lens; Operation in an adaptive mode which can project a sparse grid of pulses with higher peak power for longer range detection (>10 meters) and track animals within a zone of interest with high resolution imagery for identification of marine life at closer range (<5m); System detection limit and Signal-to-Noise-Ratio is superior to a camera, due to rejection of both backscattering component and ambient solar background; Multiple wide-angle pulsed laser illuminators and bucket detectors can be flexibly configured to cover a 4pi steradian (i.e. omnidirectional) scene volume, while also retrieving 3D features of animal targets from timing information; Process and classification framework centered around a novel active learning and incremental classification classifier that enables accurate identification of a variety of marine animals automatically; A two-tiered monitoring architecture and invisible watermarking-based data archiving and retrieving approach ensures significant data reduction while preserving high fidelity monitoring. A methodology to train and optimize the classifier for target species of concern to optimize site monitoring effectiveness. This technological innovation addresses a high priority regulatory requirement to observe marine life interaction near MHK projects. Our solution improves resource manager confidence that any interactions between marine animals and equipment are observed in a cost-effective and automated manner. Without EERE funding, this novel application of multi-static LiDAR would not have been available to the MHK community for environmental monitoring.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.; Environmental Science Division
2007-06-30
This document reports the results of groundwater monitoring in September 2005 and March 2006 at the grain storage facility formerly operated at Morrill, Kansas, by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). These activities were the first and second twice yearly sampling events of the two-year monitoring program approved by the CCC/USDA and Kansas Department of Health and Environment (KDHE) project managers. The monitoring network sampled in September 2005 consisted of 9 monitoring wells (MW1S-MW5S and MW1D [installed in the mid 1990s] and MW6S-MW8S [installed in 2004]), plus 3 private wells (Isch, Rillinger, and Stone). Themore » groundwater samples collected in this first event were analyzed for volatile organic compounds (VOCs), dissolved hydrogen, and additional groundwater parameters to aid in evaluating the potential for reductive dechlorination processes. After the monitoring in September 2005, Argonne recommended expansion of the initial monitoring network. Previous sampling (August 2004) had already suggested that the initial network was inadequate to delineate the extent of the carbon tetrachloride plume. With the approval of the CCC/USDA and KDHE project managers, the monitoring network was expanded in January 2006 through the installation of 3 additional monitoring wells (MW9S-MW11S). Details of the monitoring well installations are reported in this document. The expanded monitoring network of 12 monitoring wells (MW1S-MW11S and MW1D) and 3 private wells (Isch, Rillinger, and Stone) was sampled in March 2006, the second monitoring event in the planned two-year program. Results of analyses for VOCs showed minor increases or decreases in contaminant levels at various locations but indicated that the leading edge of the contaminant plume is approaching the intermittent stream leading to Terrapin Creek. The groundwater samples collected in March 2006 were also analyzed for additional groundwater parameters to aid in the evaluation of the potential for reductive dechlorination processes. Preliminary screening of groundwater parameters provided inadequate evidence that reductive dechlorination of carbon tetrachloride is taking place at some locations on the former CCC/USDA property. Groundwater levels measured manually in October 2005, March 2006, and June 2006 were used to map the potentiometric surface at Morrill. The results were generally consistent with each other and with previous measurements, indicating a groundwater flow direction to the south-southeast from the former CCC/USDA facility. Data recorders installed in wells MW1S-MW8S in July 2004 are gathering long-term data on the groundwater elevation and gradient. Data downloaded in August 2004, March 2005, October 2005, and June 2006 indicate that two relatively upgradient wells near the former CCC/USDA facility responded distinctly to apparent rainfall/recharge events. In contrast, two downgradient wells south of the former facility showed virtually no response, probably because of the damping influence of the nearby surface drainages and shallow groundwater at their locations. The first two monitoring events of the planned two-year monitoring program for Morrill have demonstrated no clear pattern of changes in carbon tetrachloride concentrations, though the contaminated zone has expanded toward the intermittent stream. Argonne recommends that the monitoring program continue as approved and that surface water samples be collected in future monitoring events (September 2006, March 2007, and September 2007).« less
An agronomic field-scale sensor network for monitoring soil water and temperature variation
NASA Astrophysics Data System (ADS)
Brown, D. J.; Gasch, C.; Brooks, E. S.; Huggins, D. R.; Campbell, C. S.; Cobos, D. R.
2014-12-01
Environmental sensor networks have been deployed in a variety of contexts to monitor plant, air, water and soil properties. To date, there have been relatively few such networks deployed to monitor dynamic soil properties in cropped fields. Here we report on experience with a distributed soil sensor network that has been deployed for seven years in a research farm with ongoing agronomic field operations. The Washington State University R. J. Cook Agronomy Farm (CAF), Pullman, WA, USA has recently been designated a United States Department of Agriculture (USDA) Long-Term Agro-Ecosystem Research (LTAR) site. In 2007, 12 geo-referenced locations at CAF were instrumented, then in 2009 this network was expended to 42 locations distributed across the 37-ha farm. At each of this locations, Decagon 5TE probes (Decagon Devices Inc., Pullman, WA, USA) were installed at five depths (30, 60, 90, 120, and 150 cm), with temperature and volumetric soil moisture content recorded hourly. Initially, data loggers were wirelessly connected to a data station that could be accessed through a cell connection, but due to the logistics of agronomic field operations, we later buried the dataloggers at each site and now periodically download data via local radio transmission. In this presentation, we share our experience with the installation, maintenance, calibration and data processing associated with an agronomic soil monitoring network. We also present highlights of data derived from this network, including seasonal fluctuations of soil temperature and volumetric water content at each depth, and how these measurements are influenced by crop type, soil properties, landscape position, and precipitation events.