6. Monitoring and the Northwest Forest Plan
Leslie M. Reid
1994-01-01
Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...
Craig Palmer; Barry Mulder; Barry Noon
2000-01-01
The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
.... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These.../Verification of Continued Attainment, Contingency Plan, and Conformity Determination Under Limited Maintenance...
Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deborah L. Layton; Kimberly Frerichs
2011-12-01
The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less
Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deborah L. Layton; Kimberly Frerichs
2010-07-01
The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less
Long-Term Ecological Monitoring Field Sampling Plan for 2007
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. Haney
2007-07-31
This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007more » investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.« less
Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael Tehan
2004-01-01
An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...
Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface Water
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-10-01
The Y-12 Plant conducts a surface water monitoring program in response to DOE Orders and state of Tennessee requirements under the National Pollutant Discharge Elimination System (NPDES). The anticipated codification of DOE Order 5400.5 for radiation protection of the public and the environment (10 CFR Part 834) will require an environmental radiation protection plan (ERPP). The NPDES permit issued by the state of Tennessee requires a radiological monitoring plan (RMP) for Y-12 Plant surface waters. In a May 4, 1995 memo, the state of Tennessee, Division of Water Pollution Control, stated their desired needs and goals regarding the content ofmore » RMPs, associated documentation, and data resulting from the RMPs required under the NPDES permitting system (L. Bunting, General Discussion, Radiological Monitoring Plans, Tennessee Division of Water Pollution Control, May 4,1995). Appendix A provides an overview of how the Y-12 Plant will begin to address these needs and goals. It provides a more complete, documented basis for the current Y-12 Plant surface water monitoring program and is intended to supplement documentation provided in the Annual Site Environmental Reports (ASERs), NPDES reports, Groundwater Quality Assessment Reports, and studies conducted under the Y-12 Plant Environmental Restoration (ER) Program. The purpose of this update to the Y-12 Plant RMP is to satisfy the requirements of the current NPDES permit, DOE Order 5400.5, and 10 CFR Part 834, as current proposed, by defining the radiological monitoring plan for surface water for the Y-12 Plant. This plan includes initial storm water monitoring and data analysis. Related activities such as sanitary sewer and sediment monitoring are also summarized. The plan discusses monitoring goals necessary to determine background concentrations of radionuclides, to quantify releases, determine trends, satisfy regulatory requirements, support consequence assessments, and meet requirements that releases be ``as low as reasonably achievable`` (ALARA).« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-11
...EPA is proposing to make two determinations regarding the tri- state Huntington-Ashland, West Virginia-Kentucky-Ohio fine particulate matter (PM2.5) nonattainment Area (hereafter referred to as ``the Huntington-Ashland Area'' or ``Area''). First, EPA is proposing to determine that the Area has attained the 1997 annual average PM2.5 National Ambient Air Quality Standard (NAAQS). This proposed determination of attainment is based upon complete, quality- assured and certified ambient air monitoring data for the 2007-2009 period showing that the Area has attained the 1997 annual PM2.5 NAAQS, and data available to date for 2010 in EPA's Air Quality System (AQS) database that show the area continues to attain. If EPA finalizes this proposed determination of attainment, the requirements for the Area to submit attainment demonstrations and associated reasonably available control measures (RACM), a reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan (SIP) revisions related to attainment of the standard shall be suspended for so long as the Area continues to attain the annual PM2.5 NAAQS. Second, EPA is also proposing to determine, based on quality-assured and certified monitoring data for the 2007-2009 monitoring period, that the Area has attained the 1997 annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
... ambient air quality monitoring data for the period preceding the applicable attainment deadline. DATES... and certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data... standard, generally based on air quality monitoring data from the 1987 through 1989 period (section 107(d...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
... based on complete, quality-assured and certified ambient air quality monitoring data for 2007-2009... certain air quality monitoring data because they meet the criteria for ozone exceptional events that are... certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data show...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-14
...EPA is proposing to determine that the Birmingham, Alabama, nonattainment area for the 2006 24-hour fine particulate matter (PM2.5) National Ambient Air Quality Standard (NAAQS) has attained the 2006 24-hour PM2.5 NAAQS. This proposed determination is based upon complete, quality assured, quality controlled, and certified ambient air monitoring data for the years 2007-2009 showing that this area has monitored attainment of the 2006 24-hour PM2.5 NAAQS. If this proposed determination is made final, the requirement for the State of Alabama to submit an attainment demonstration and associated reasonably available control measures (RACM), reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plans (SIPs) related to attainment of the 2006 24-hour PM2.5 standard for the Birmingham, Alabama, PM2.5 nonattainment area, shall be suspended for as long as this area continues to meet the 2006 24-hour PM2.5 NAAQS.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
...EPA is making two determinations regarding the Philadelphia- Wilmington, PA-NJ-DE fine particulate (PM2.5) nonattainment area (the Philadelphia Area). First, EPA is making a determination that the Philadelphia Area has attained the 1997 annual PM2.5 national ambient air quality standard (NAAQS) by its attainment date of April 5, 2010. This determination is based upon quality assured and certified ambient air monitoring data that show the area monitored attainment of the 1997 annual PM2.5 NAAQS for the 2007-2009 monitoring period. Second, EPA is making a clean data determination, finding that the Philadelphia Area has attained the 1997 PM2.5 NAAQS, based on quality assured and certified ambient air monitoring data for the 2007-2009 and 2008-2010 monitoring periods. In accordance with EPA's applicable PM2.5 implementation rule, this determination suspends the requirement for the Philadelphia Area to submit an attainment demonstration, reasonably available control measures/reasonably available control technology (RACM/RACT), a reasonable further progress (RFP) plan, and contingency measures related to attainment of the 1997 annual PM2.5 NAAQS for so long as the area continues to attain the 1997 annual PM2.5 NAAQS. These actions are being taken under the Clean Air Act (CAA).
Raymond J. Davis; Janet L. Ohmann; Robert E. Kennedy; Warren B. Cohen; Matthew J. Gregory; Zhiqiang Yang; Heather M. Roberts; Andrew N. Gray; Thomas A. Spies
2015-01-01
This is the third in a series of periodic monitoring reports on LSOG or latesuccessional and old-growth (older) forest status trends on federally administered lands since implementation of the Northwest Forest Plan (NWFP or the Plan) in 1994. The objective of this monitoring is to determine if the NWFP is providing for conservation and management of older forests as...
Design tool for inventory and monitoring
Charles T. Scott; Renate Bush
2009-01-01
Forest survey planning typically begins by determining the area to be sampled and the attributes to be measured. All too often the data are collected but underutilized because they did not address the critical management questions. The Design Tool for Inventory and Monitoring (DTIM) is being developed by the National Inventory and Monitoring Applications Center in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-02
...EPA is making two determinations, one regarding the Knoxville, Tennessee, 1997 annual fine particulate (PM2.5) nonattainment area and one regarding the Knoxville-Sevierville-La Follette, Tennessee, 2006 24-hour PM2.5 nonattainment area (both areas have the same geographic boundary and will hereafter be collectively referred to as the ``Knoxville Area'' or ``Area''). First, EPA is determining that the Area has attained the 1997 annual PM2.5 National Ambient Air Quality Standards (NAAQS or ``standard''). Second, EPA is determining that the Area has attained the 2006 24-hour PM2.5 NAAQS. These determinations of attaining data are based upon quality-assured and certified ambient air monitoring data for the 2009-2011 period, showing that the Area has monitored attainment of the 1997 annual PM2.5 NAAQS and 2006 24-hour PM2.5 NAAQS. The requirements for the Area to submit an attainment demonstration and associated reasonably available control measures (RACM), reasonable further progress (RFP) plans, contingency measures, and other planning State Implementation Plan (SIP) revisions related to attainment of the standards shall be suspended so long as the Area continues to attain the respective PM2.5 NAAQS.
Wang, Zhaoguo; Du, Xishihui
2016-07-01
Natural World Heritage Sites (NWHSs) are invaluable treasure due to the uniqueness of each site. Proper monitoring and management can guarantee their protection from multiple threats. In this study, geographic information system (GIS)-based multi-criteria decision analysis (GIS-MCDA) was used to assess criteria layers acquired from the data available in the literature. A conceptual model for determining the priority area for monitoring in Bogda, China, was created based on outstanding universal values (OUV) and expert knowledge. Weights were assigned to each layer using the analytic hierarchy process (AHP) based on group decisions, encompassing three experts: one being a heritage site expert, another a forest ranger, and the other a heritage site manager. Subsequently, evaluation layers and constraint layers were used to generate a priority map and to determine the feasibility of monitoring in Bogda. Finally, a monitoring suitability map of Bogda was obtained by referencing priority and feasibility maps.The high-priority monitoring area is located in the montane forest belt, which exhibits high biodiversity and is the main tourist area of Bogda. The northern buffer zone of Bogda comprises the concentrated feasible monitoring areas, and the area closest to roads and monitoring facilities is highly feasible for NWHS monitoring. The suitability of an area in terms of monitoring is largely determined by the monitoring priority in that particular area. The majority of planned monitoring facilities are well distributed in both suitable and less suitable areas. Analysis results indicate that the protection of Bogda will be more scientifically based due to its effective and all-around planned monitoring system proposed by the declaration text of Xinjiang Tianshan, which is the essential file submitted to World Heritage Centre to inscribe as a NWHS.
Hullsiek, Katherine Huppler; Kagan, Jonathan M; Engen, Nicole; Grarup, Jesper; Hudson, Fleur; Denning, Eileen T; Carey, Catherine; Courtney-Rodgers, David; Finley, Elizabeth B; Jansson, Per O; Pearson, Mary T; Peavy, Dwight E; Belloso, Waldo H
2014-01-01
Background Trial monitoring protects participant safety and study integrity. While monitors commonly go on-site to verify source data, there is little evidence that this practice is efficient or effective. An ongoing international HIV treatment trial (START) provides an opportunity to explore the usefulness of different monitoring approaches. Methods All START sites are centrally monitored and required to follow a local monitoring plan requiring specific quality assurance activities. Additionally, sites were randomized (1:1) to receive, or not receive, annual on-site monitoring. The study will determine if on-site monitoring increases the identification of major protocol deviations (eligibility or consent violations, improper study drug use, primary or serious event underreporting, data alteration or fraud). Results The START study completed enrollment in December 2013, with planned follow-up through December 2016. The monitoring study is ongoing at 196 sites in 34 countries. Results are expected when the START study concludes in December 2016. PMID:25973346
Central Alaska Network vital signs monitoring plan
MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug
2005-01-01
Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.
40 CFR 74.61 - Monitoring plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...
Yock, Adam D; Pawlicki, Todd; Kim, Gwe-Ya
2016-07-01
In surface image guided radiosurgery, action limits are created to determine at what point intrafractional motion exhibited by the patient is large enough to warrant intervention. Action limit values remain constant across patients despite the fact that patient motion affects the target coverage of brain metastases differently depending on the planning technique and other treatment plan-specific factors. The purpose of this work was twofold. The first purpose was to characterize the sensitivity of single-met per iso and multimet per iso treatment plans to uncorrected patient motion. The second purpose was to describe a method to prospectively determine treatment plan-specific action limits considering this sensitivity. In their surface image guided radiosurgery technique, patient positioning is achieved with a thermoplastic mask that does not cover the patient's face. The patient's exposed face is imaged by a stereoscopic photogrammetry system. It is then compared to a reference surface and monitored throughout treatment. Seventy-two brain metastases (representing 29 patients) were used for this study. Twenty-five mets were treated individually ("single-met per iso plans"), and 47 were treated in a plan simultaneously with at least one other met ("multimet per iso plans"). For each met, the proportion of the gross tumor volume that remained within the 100% prescription isodose line was estimated under the influence of combinations of translations and rotations (0.0-3.0 mm and 0.0°-3.0°, respectively). The target volume and the prescription dose-volume were considered concentric spheres that each encompassed a volume determined from the treatment plan. Plan-specific contour plots and DVHs were created to illustrate the sensitivity of a specific lesion to uncorrected patient motion. Both single-met per iso and multimet per iso plans exhibited compromised target coverage under translations and rotations, though multimet per iso plans were considerably more sensitive to these transformations (2.3% and 39.8%, respectively). Plan-specific contour plots and DVHs were used to illustrate how size, distance from isocenter, and planning technique affect a particular met's sensitivity to motion. Stereotactic radiosurgery treatment plans that treat multiple brain metastases using a common isocenter are particularly susceptible to compromised target coverage as a result of uncorrected patient motion. The use of such a planning technique along with other treatment plan-specific factors should influence patient motion management. A graphical representation of the effect of translations and rotations on any particular plan can be generated to inform clinicians of the appropriate action limit when monitoring intrafractional motion.
40 CFR 60.273a - Emission monitoring.
Code of Federal Regulations, 2011 CFR
2011-07-01
... melting and refining period. All visible emissions observations shall be conducted in accordance with... operating in the meltdown and refining period. Shop opacity shall be determined as the arithmetic average of... could lead to an alarm in the monitoring plan, adequately explains why it is not feasible to alleviate...
40 CFR 60.273a - Emission monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... melting and refining period. All visible emissions observations shall be conducted in accordance with... operating in the meltdown and refining period. Shop opacity shall be determined as the arithmetic average of... could lead to an alarm in the monitoring plan, adequately explains why it is not feasible to alleviate...
Department of Defense Chemical and Biological Defense Program. FY2004-2006 Performance Plan
2005-03-01
Agents (NTAs) Compare the direct effects of PAF on smooth muscle, hematic constituents, and lung to determine role in toxicity. Continue to identify...Range Biometric Target ID System Explore technologies for a long range biometric target identification system. Air Containment Monitoring System...Continue development of systems for contained air monitoring for chemical agents.Long Range Biometric Air Containment Monitoring System Continued
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peelle, E.; Schweitzer, M.; Scharre, P.
1979-07-01
This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less
Wilkison, Donald H.
2012-01-01
Source contributions to monitoring and supply wells, contributing recharge areas, groundwater travel times, and current (2012) understanding of alluvial water quality were used to develop a groundwater monitoring plan for the Missouri River alluvial aquifer in the vicinity of the City of Independence, Missouri well field. The plan was designed to evaluate long-term alluvial water quality and assess potential changes in, and threats to, well-field water quality. Source contributions were determined from an existing groundwater flow model in conjunction with particle-tracking analysis and verified with water-quality data collected from 1997 through 2010 from a network of 68 monitoring wells. Three conjunctive factors - well-field pumpage, Missouri River discharge, and aquifer recharge - largely determined groundwater flow and, therefore, source contributions. The predominant source of groundwater to most monitoring wells and supply wells is the Missouri River, and this was reflected, to some extent, in alluvial water quality. To provide an estimate of the maximum potential lead time available for remedial action, monitoring wells where groundwater travel times from the contributing recharge areas are less than 2 years and predominately singular sources (such as the Missouri River or the land surface) were selected for annual sampling. The sample interval of the remaining wells, which have varying travel times and intermediate mixtures of river and land-surface contributions, were staggered on a 2-, 3-, or 4-year rotation. This was done to provide data from similar contributing areas and account for inherent aquifer variability yet minimize sample redundancy.
Recent population decline of the Marbled Murrelet in the Pacific Northwest
Sherri L. Miller; Martin G. Raphael; Gary A. Falxa; Craig Strong; Jim Baldwin; Thomas Bloxton; Beth M. Galleher; Monique Lance; Deanna Lynch; Scott F. Pearson; C. John Ralph; Richard D. Young
2012-01-01
We document here a decline of nearly 30% in the Marbled Murrelet (Brachyramphus marmoratus) population of Washington, Oregon, and northern California between 2000 and 2010. The Northwest Forest Plan is an ecosystem-management plan for federal forest lands in the Pacific Northwest of the United States that incorporates monitoring to determine if...
77 FR 58813 - Western Pacific Fisheries; Approval of a Marine Conservation Plan for American Samoa
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
.... Determining genetic connectivity of coral reef ecosystems in the Samoa archipelago; 21. Surveying fish... quality of deep reef habitat through use of drop cameras; 32. Coral recruitment survey and monitoring; 33... scientific awareness of junior biologist; and 46. Monitoring of coral reefs in Independent Samoa. Objective 7...
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... evaluate monitored air quality data and is used to determine whether an area's air quality meets a NAAQS... documentation in their submittals explaining how the emissions data were calculated. 70 FR at 71664 and EI... inventories for the SJV. See Table 1 below. These revised inventories incorporate improved activity data and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-24
... recorded in EPA's Air Quality System (AQS) database. To account for missing data, the procedures found in... three-year period and then adjusts for missing data. In short, if the three-year average expected... ambient air quality monitoring data for the 2001-2003 monitoring period showing that the area had an...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-14
... requirement for one or more quarters during 2010-2012 monitoring period. EPA has addressed missing data from... recorded values are substituted for the missing data, and the resulting 24-hour design value is compared to... missing data from the Greensburg monitor by performing a statistical analysis of the data, in which a...
Comprehensive Monitoring Program. Air Quality Data Assessment for 1989. Version 2.1. Volume 2
1990-06-01
Hg collected on Hopcalite TH media. 4.4.3.2 Basin F Data. Table 4.4-5 shows average and maximum metals values for the Basin F Remedial Monitoring...PMRMA. "Chemical Quality Assurance Plan." Version 1.0, July, 1989. Rathje and Marcero. 1976. "Improved Hopcalite Procedure for the Determination of
Evaluating barnyard Best Management Practices in Wisconsin using upstream-downstream monitoring
Stuntebeck, Todd D.
1995-01-01
The Nonpoint Source Water Pollution Abatement Program was created in 1978 by the Wisconsin Legislature. The goal of the program is to improve and protect the water quality of lakes, streams, wetlands, and ground water within selected priority watersheds by controlling sources of nonpoint pollution. For each selected watershed, the Wisconsin Department of Natural Resources drafts a management plan that guides the implementation of pollution-control strategies known as Best Management Practices (BMP's). This plan summarizes resource and land-use inventories, describes the results of pollution-source modeling, and suggests pollution reduction goals. The U.S. Geological Survey, through a cooperative effort with the Wisconsin Department of Natural Resources, is monitoring water-quality improvements that result from the implementation of BMP's. The data collected are then compared to the watershed plans to assess progress and determine whether goals are being realized. This fact sheet describes the data-collection efforts, preliminary results, and planned data-analysis techniques of monitoring projects for pre-BMP conditions at two barnyards, one each on Otter Creek and Halfway Prairie Creek.
SU-E-T-605: Performance Evaluation of MLC Leaf-Sequencing Algorithms in Head-And-Neck IMRT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jing, J; Lin, H; Chow, J
2015-06-15
Purpose: To investigate the efficiency of three multileaf collimator (MLC) leaf-sequencing algorithms proposed by Galvin et al, Chen et al and Siochi et al using external beam treatment plans for head-and-neck intensity modulated radiation therapy (IMRT). Methods: IMRT plans for head-and-neck were created using the CORVUS treatment planning system. The plans were optimized and the fluence maps for all photon beams determined. Three different MLC leaf-sequencing algorithms based on Galvin et al, Chen et al and Siochi et al were used to calculate the final photon segmental fields and their monitor units in delivery. For comparison purpose, the maximum intensitymore » of fluence map was kept constant in different plans. The number of beam segments and total number of monitor units were calculated for the three algorithms. Results: From results of number of beam segments and total number of monitor units, we found that algorithm of Galvin et al had the largest number of monitor unit which was about 70% larger than the other two algorithms. Moreover, both algorithms of Galvin et al and Siochi et al have relatively lower number of beam segment compared to Chen et al. Although values of number of beam segment and total number of monitor unit calculated by different algorithms varied with the head-and-neck plans, it can be seen that algorithms of Galvin et al and Siochi et al performed well with a lower number of beam segment, though algorithm of Galvin et al had a larger total number of monitor units than Siochi et al. Conclusion: Although performance of the leaf-sequencing algorithm varied with different IMRT plans having different fluence maps, an evaluation is possible based on the calculated number of beam segment and monitor unit. In this study, algorithm by Siochi et al was found to be more efficient in the head-and-neck IMRT. The Project Sponsored by the Fundamental Research Funds for the Central Universities (J2014HGXJ0094) and the Scientific Research Foundation for the Returned Overseas Chinese Scholars, State Education Ministry.« less
Saint, Victoria; Floranita, Rustini; Koemara Sakti, Gita Maya; Pambudi, Imran; Hermawan, Lukas; Villar, Eugenio; Magar, Veronica
2018-01-01
ABSTRACT The World Health Organization’s Innov8 Approach for Reviewing National Health Programmes to Leave No One Behind is an eight-step process that supports the operationalization of the Sustainable Development Goals’ commitment to ‘leave no one behind’. In 2014–2015, Innov8 was adapted and applied in Indonesia to review how the national neonatal and maternal health action plans could become more equity-oriented, rights-based and gender-responsive, and better address critical social determinants of health. The process was led by the Indonesian Ministry of Health, with the support of WHO. It involved a wide range of actors and aligned with/fed into the drafting of the maternal newborn health action plan and the implementation planning of the newborn action plan. Key activities included a sensitization meeting, diagnostic checklist, review workshop and in-country work by the review teams. This ‘methods forum’ article describes this adaptation and application process, the outcomes and lessons learnt. In conjunction with other sources, Innov8 findings and recommendations informed national and sub-national maternal and neonatal action plans and programming to strengthen a ‘leave no one behind’ approach. As follow-up during 2015–2017, components of the Innov8 methodology were integrated into district-level planning processes for maternal and newborn health, and Innov8 helped generate demand for health inequality monitoring and its use in planning. In Indonesia, Innov8 enhanced national capacity for equity-oriented, rights-based and gender-responsive approaches and addressing critical social determinants of health. Adaptation for the national planning context (e.g. decentralized structure) and linking with health inequality monitoring capacity building were important lessons learnt. The pilot of Innov8 in Indonesia suggests that this approach can help operationalize the SDGs’ commitment to leave no one behind, in particular in relation to influencing programming and monitoring and evaluation. PMID:29569529
Koller, Theadora Swift; Saint, Victoria; Floranita, Rustini; Koemara Sakti, Gita Maya; Pambudi, Imran; Hermawan, Lukas; Briot, Benedicte; Frenz, Patricia; Solar, Orielle; Campos, Pilar; Villar, Eugenio; Magar, Veronica
The World Health Organization's Innov8 Approach for Reviewing National Health Programmes to Leave No One Behind is an eight-step process that supports the operationalization of the Sustainable Development Goals' commitment to 'leave no one behind'. In 2014-2015, Innov8 was adapted and applied in Indonesia to review how the national neonatal and maternal health action plans could become more equity-oriented, rights-based and gender-responsive, and better address critical social determinants of health. The process was led by the Indonesian Ministry of Health, with the support of WHO. It involved a wide range of actors and aligned with/fed into the drafting of the maternal newborn health action plan and the implementation planning of the newborn action plan. Key activities included a sensitization meeting, diagnostic checklist, review workshop and in-country work by the review teams. This 'methods forum' article describes this adaptation and application process, the outcomes and lessons learnt. In conjunction with other sources, Innov8 findings and recommendations informed national and sub-national maternal and neonatal action plans and programming to strengthen a 'leave no one behind' approach. As follow-up during 2015-2017, components of the Innov8 methodology were integrated into district-level planning processes for maternal and newborn health, and Innov8 helped generate demand for health inequality monitoring and its use in planning. In Indonesia, Innov8 enhanced national capacity for equity-oriented, rights-based and gender-responsive approaches and addressing critical social determinants of health. Adaptation for the national planning context (e.g. decentralized structure) and linking with health inequality monitoring capacity building were important lessons learnt. The pilot of Innov8 in Indonesia suggests that this approach can help operationalize the SDGs' commitment to leave no one behind, in particular in relation to influencing programming and monitoring and evaluation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee
2003-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2004-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites
Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.
2016-01-01
Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.
Development and implementation of a scrub habitat compensation plan for Kennedy Space Center
NASA Technical Reports Server (NTRS)
Schmalzer, Paul A.; Breininger, David R.; Adrian, Frederic W.; Schaub, Ron; Duncan, Brean W.
1994-01-01
Kennedy Space Center (KSC), located on Merritt Island on the east coast of central Florida, is one of three remaining major populations of the Florida Scrub Jay (Aphelocoma coerulescens coerulescens), listed as threatened by the U.S. Fish and Wildlife Service (USFWS) since 1987. Construction of new facilities by the National Aeronautics and Space Administration (NASA) on KSC over the next five years has the potential to impact up to 193 ac (78.1 ha) of Scrub Jay habitat. Under an early consultation process with the Endangered Species Office of the USFWS, NASA agreed to a compensation plan for loss of Scrub Jay habitat. The compensation plan required NASA to restore or create scrub on KSC at a 2:1 ratio for that lost. The compensation plan emphasized restoration of scrub habitat that is of marginal or declining suitability to Scrub Jays because it has remained unburned. Although prescribed burning has been conducted by the USFWS Merritt Island National Wildlife Refuge (MINWR) for more than ten years, significant areas of scrub remain unburned because they have been excluded from fire management units or because landscape fragmentation and a period of fire suppression allowed scrub to reach heights and diameters that are fire resistant. For such areas, mechanical cutting followed by prescribed burning was recommended for restoration. A second part of the restoration plan is an experimental study of scrub reestablishment (i.e., creation) on abandoned, well drained agricultural sites by planting scrub oaks and other scrub plants. The compensation plan identified 260 ac (105 ha) of scrub restoration in four areas and a 40 ac (16 ha) scrub creation site. Monitoring of restoration sites required under the plan included: establishing permanent vegetation sample transects before treatment and resampling annually for ten years after treatment, and color banding Scrub Jays to determine territories prior to treatment followed by monitoring reproductive success and survival for ten years after treatment. Monitoring scrub creation sites included determining survival of planted material for five years and establishing permanent transects to follow vegetation development for ten years after planting. Scrub Jay monitoring of creation sites is incorporated with that of adjacent restoration sites.
ERIC Educational Resources Information Center
Jordan, Jerry Monroe; Roloff, Michael E.
1997-01-01
Focuses on skills necessary for effective negotiation planning. Argues that the information processing tendencies of high self-monitors make them adept at negotiation planning. Extends existing work by relating self-monitoring to plan generation, enactment, and consequences. Indicates that self-monitoring is related to prenegotiation goal…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suber, Gregory
2012-07-01
In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less
A Comprehensive Study on Technologies of Tyre Monitoring Systems and Possible Energy Solutions
Kubba, Ali E.; Jiang, Kyle
2014-01-01
This article presents an overview on the state of the art of Tyre Pressure Monitoring System related technologies. This includes examining the latest pressure sensing methods and comparing different types of pressure transducers, particularly their power consumption and measuring range. Having the aim of this research to investigate possible means to obtain a tyre condition monitoring system (TCMS) powered by energy harvesting, various approaches of energy harvesting techniques were evaluated to determine which approach is the most applicable for generating energy within the pneumatic tyre domain and under rolling tyre dynamic conditions. This article starts with an historical review of pneumatic tyre development and demonstrates the reasons and explains the need for using a tyre condition monitoring system. Following this, different tyre pressure measurement approaches are compared in order to determine what type of pressure sensor is best to consider in the research proposal plan. Then possible energy harvesting means inside land vehicle pneumatic tyres are reviewed. Following this, state of the art battery-less tyre pressure monitoring systems developed by individual researchers or by world leading tyre manufacturers are presented. Finally conclusions are drawn based on the reviewed documents cited in this article and a research proposal plan is presented. PMID:24922457
Assessing Young Children in Inclusive Settings: The Blended Practices Approach
ERIC Educational Resources Information Center
Grisham-Brown, Jennifer; Pretti-Frontczak, Kristie
2011-01-01
To ensure the best possible outcomes for young children with and without disabilities, early childhood educators must enter the classroom ready to conduct all types of early childhood assessment--including determining if children need additional services, planning and monitoring instruction, and determining program effectiveness. They'll get the…
1991-05-01
health monitoring , and detection avoidance. Similar to the im!proved ca abi!ities of electr,-.ics with the introduction of the integrated circuit...Sensors not needing to emit signals to detect targets, monitor the environment, or determine 1he status or condition of equipment. 9 Signal & Image... monitoring , and detection avoidance. Photonics R &D will significantly affect the high-speed computing defense iadustrial base through the development of
Space Station Freedom Environmental Health Care Program
NASA Technical Reports Server (NTRS)
Richard, Elizabeth E.; Russo, Dane M.
1992-01-01
The paper discusses the environmental planning and monitoring aspects of the Space Station Freedom (SSF) Environmental Health Care Program, which encompasses all phases of the SSF assembly and operation from the first element entry at MB-6 through the Permanent Manned Capability and beyond. Environmental planning involves the definition of acceptability limits and monitoring requirements for the radiation dose barothermal parameters and potential contaminants in the SSF air and water and on internal surfaces. Inflight monitoring will be implemented through the Environmental Health System, which consists of five subsystems: Microbiology, Toxicology, Water Quality, Radiation, and Barothermal Physiology. In addition to the environmental data interpretation and analysis conducted after each mission, the new data will be compared to archived data for statistical and long-term trend analysis and determination of risk exposures. Results of these analyses will be used to modify the acceptability limits and monitoring requirements for the future.
Contamination control plan for prelaunch operations
NASA Technical Reports Server (NTRS)
Austin, J. D.
1983-01-01
A unified, systematic plan is presented for contamination control for space flight systems. Allowable contaminant quantities, or contamination budgets, are determined based on system performance margins and system-level allowable degradations. These contamination budgets are compared to contamination rates in ground environments to establish the controls required in each ground environment. The use of feedback from contamination monitoring and some contamination control procedures are discussed.
This research plan has several objectives: 1) develop new or refine existing chemical, instrument and biological methods for the detection of cyanobacteria and their toxins; test such methods in field studies in both HAB and non HAB environments; 2) determine the method(s) that c...
Raymond J. Davis; Bruce Hollen; Jeremy Hobson; Julia E. Gower; David. Keenum
2016-01-01
This is the third in a series of periodic monitoring reports on northern spotted owl (Strix occidentalis caurina) habitat status and trends on federally administered lands since implementation of the Northwest Forest Plan (NWFP) in 1994. The objective of this monitoring is to determine if the NWFP is providing for conservation and management of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
.... SUMMARY: EPA is proposing to determine, pursuant to the Clean Air Act (CAA), that the bi-state St. Louis... replacement monitor be combined. Table 3--Design Values for Incomplete Data Monitors Compared to Highest... design values are used to compare against the NAAQS. Table 3 illustrates that the Arnold and Tenbrook and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
... [mu]g/m\\3\\ for all missing data in 1st quarter of 2008. \\4\\ Macon SE Annual Mean considers data...; Georgia: Macon; Determination of Attaining Data for the 1997 Annual Fine Particulate Standards AGENCY... air monitoring data for the 2007-2009 period showing that the Area has monitored attainment of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-17
... substituted for missing data. See 40 CFR Part 58, appendix D for network design criteria. EPA has approved the... certified ambient air monitoring data for the 2007-2009 period showing that the areas have monitored attainment of the annual PM 2.5 NAAQS. EPA also evaluated incomplete data from this period from other...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... missing data. The linear regression relationship is based on time periods in which both monitors were... fill in missing data for the incomplete monitor, so that the normal data completeness requirement of 75 percent of data in each quarter of the three years is met. After the missing data for the site is filled...
NASA Technical Reports Server (NTRS)
Hoebel, Louis J.
1993-01-01
The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.
Nurmi, Johanna; Hagger, Martin S; Haukkala, Ari; Araújo-Soares, Vera; Hankonen, Nelli
2016-04-01
This study tested the predictive validity of a multitheory process model in which the effect of autonomous motivation from self-determination theory on physical activity participation is mediated by the adoption of self-regulatory techniques based on control theory. Finnish adolescents (N = 411, aged 17-19) completed a prospective survey including validated measures of the predictors and physical activity, at baseline and after one month (N = 177). A subsample used an accelerometer to objectively measure physical activity and further validate the physical activity self-report assessment tool (n = 44). Autonomous motivation statistically significantly predicted action planning, coping planning, and self-monitoring. Coping planning and self-monitoring mediated the effect of autonomous motivation on physical activity, although self-monitoring was the most prominent. Controlled motivation had no effect on self-regulation techniques or physical activity. Developing interventions that support autonomous motivation for physical activity may foster increased engagement in self-regulation techniques and positively affect physical activity behavior.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
2011-03-01
The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Waste Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2010. This annual summary report presents data and conclusions from the FY 2010 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at themore » Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.« less
Krafft, Cairn; Hatfield, Jeffrey S.
2014-01-01
Four tidal freshwater wetland restoration projects have been undertaken within Anacostia Park on lands managed by the National Park Service since 1993. Monitoring the impacts of Canada goose (Branta canadensis) herbivory on the wetland vegetation will play a key role in determining the long-term health of these tidal freshwater wetland restorations. This Implementation Plan lays out monitoring for impacts of herbivory on the vegetation in Kingman Area 1 and inferred to the other wetland areas.
Schneider, Tiffany Rae; McFarland, W.D.
1996-01-01
A hydrologic reconnaissance of the Medicine Lake Volcano area was done to collect data needed for the design of a hydrologic monitoring plan. The reconnaissance was completed during two field trips made in June and September 1992, during which geothermal and hydrologic features of public interest in the Medicine Lake area were identified. Selected wells, springs, and geothermal features were located and documented, and initial water-level, discharge, temperature, and specific-conductance measurements were made. Lakes in the study area also were surveyed during the September field trip. Temperature, specific- conductance, dissolved oxygen, and pH data were collected by using a multiparameter probe. The proposed monitoring plan includes measurement of water levels in wells, discharge from springs, and lake stage, as well as analysis of well-,spring-, and lake-water quality. In determining lake-water quality, data for both stratified and unstratified conditions would be considered. (Data for stratified conditions were collected during the reconnaissance phase of this project, but data for unstratified conditions were not.) In addition, lake stage also would be monitored. A geothermal feature near Medicine Lake is a "hot spot" from which hot gases discharge from two distinct vents. Gas chemistry and temperature would be monitored in one of these vents.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... Purposes; Tennessee: Knoxville; Determination of Attaining Data for the 1997 8-Hour Ozone Standards AGENCY... make a determination that the Knoxville, Tennessee nonattainment area for the 1997 8-hour ozone..., quality controlled monitoring data from 2007 through 2009. The Knoxville 1997 8-hour ozone nonattainment...
Performance evaluation of the NASA/KSC CAD/CAE and office automation LAN's
NASA Technical Reports Server (NTRS)
Zobrist, George W.
1994-01-01
This study's objective is the performance evaluation of the existing CAD/CAE (Computer Aided Design/Computer Aided Engineering) network at NASA/KSC. This evaluation also includes a similar study of the Office Automation network, since it is being planned to integrate this network into the CAD/CAE network. The Microsoft mail facility which is presently on the CAD/CAE network was monitored to determine its present usage. This performance evaluation of the various networks will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the CAD/CAE network and determining the effectiveness of the planned FDDI (Fiber Distributed Data Interface) migration.
An Intervention to Increase the Use of Asthma Action Plans in Schools: A MASNRN Study
ERIC Educational Resources Information Center
Pulcini, Joyce; DeSisto, Marie C.; McIntyre, C. Lynne
2007-01-01
School nurses, in collaboration with primary care providers (PCPs), can work to better manage asthma by using the Asthma Action Plan (AAP) with peak flow monitoring. The aim of this pilot study was to determine the effectiveness of an intervention to increase the number of AAPs in schools for students with asthma by having school nurses provide…
Guidance for the Development of Air Force Storm Water Sampling Programs
1993-09-01
38 Storm Water Quality Monitoring ................. 39 Determining Flow Rate ....................... 42 Weirs and Flumes... water quality monitoring it is not possible to analyze the entire nmoff from a drainage basin. The objective of water quality sampling is to collect a...development of storm water pollution prevention plans. Best management practices can also be developed to control the pollution sources identified. In storm
DOE Office of Scientific and Technical Information (OSTI.GOV)
Casey, Daniel; Malta, Patrick
1990-06-01
Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area.more » Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.« less
40 CFR 141.601 - Standard monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Standard monitoring. 141.601 Section... Standard monitoring. (a) Standard monitoring plan. Your standard monitoring plan must comply with paragraphs (a)(1) through (a)(4) of this section. You must prepare and submit your standard monitoring plan...
40 CFR 75.62 - Monitoring plan submittals.
Code of Federal Regulations, 2010 CFR
2010-07-01
... representative for an affected unit shall submit a complete, electronic, up-to-date monitoring plan file (except... quarterly report for a reporting quarter where an update of the electronic monitoring plan information is... associated, pursuant to § 75.53(b). Electronic submittal of all monitoring plan information, including...
Recovering from execution errors in SIPE
NASA Technical Reports Server (NTRS)
Wilkins, D. E.
1987-01-01
In real-world domains (e.g., a mobile robot environment), things do not always proceed as planned, so it is important to develop better execution-monitoring techniques and replanning capabilities. These capabilities in the SIPE planning system are described. The motivation behind SIPE is to place enough limitations on the representation so that planning can be done efficiently, while retaining sufficient power to still be useful. This work assumes that new information given to the execution monitor is in the form of predicates, thus avoiding the difficult problem of how to generate these predicates from information provided by sensors. The replanning module presented here takes advantage of the rich structure of SIPE plans and is intimately connected with the planner, which can be called as a subroutine. This allows the use of SIPE's capabilities to determine efficiently how unexpected events affect the plan being executed and, in many cases, to retain most of the original plan by making changes in it to avoid problems caused by these unexpected events. SIPE is also capable of shortening the original plan when serendipitous events occur. A general set of replanning actions is presented along with a general replanning capability that has been implemented by using these actions.
Troyer, Caitlin M; Gerber, Leah R
2015-10-01
The Endangered Species Act (ESA) of the United States was enacted in 1973 to prevent the extinction of species. Recovery plans, required by 1988 amendments to the ESA, play an important role in organizing these efforts to protect and recover species. To improve the use of science in the recovery planning process, the Society for Conservation Biology (SCB) commissioned an independent review of endangered species recovery planning in 1999. From these findings, the SCB made key recommendations for how management agencies could improve the recovery planning process, after which the U.S. Fish and Wildlife Service and the National Marine Fisheries Service redrafted their recovery planning guidelines. One important recommendation called for recovery plans to make threats a primary focus, including organizing and prioritizing recovery tasks for threat abatement. We sought to determine the extent to which results from the SCB study were incorporated into these new guidelines and whether the SCB recommendations regarding threats manifested in recovery plans written under the new guidelines. Recovery planning guidelines generally incorporated the SCB recommendations, including those for managing threats. However, although recent recovery plans have improved in their treatment of threats, many fail to adequately incorporate threat monitoring. This failure suggests that developing clear guidelines for monitoring should be an important priority in improving ESA recovery planning. © 2015 Society for Conservation Biology.
Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.
2001-07-01
The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematicmore » application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.« less
U.S. Marine Corps S&T Strategic Plan: Leading Edge Technology for the Marines of Tomorrow
2009-07-29
in monitoring exercise intensity, frequency, duration, recovery, and/or specific physiological indicators of aerobic training to prevent over-or...plan that focus specifically on Escalation of Force and Irregular Wa, fa",. III aoJditiuII, we have muvcd Training & Education from an Annex into...vision by developing Marine Corps warfighting concepts and determines required capabilities through Doctrine, Organization, Training , Materiel
A patient self-assessment tool for cardiac rehabilitation.
Phelan, C; Finnell, M D; Mottla, K A
1989-01-01
A patient self-assessment tool was designed, tested, and implemented to promote cardiac-specific data collection, based on Gordon's Functional Health Patterns, to maximize patient/family involvement in determining a plan of care, and to streamline primary nurses' documentation requirements. Retrospective and concurrent chart reviews provided data for quality assurance monitoring. The results of the monitoring demonstrated that the self-assessment tool markedly improved the patient-specific data base.
36 CFR 219.11 - Monitoring and evaluation for adaptive management.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sustainability in the plan area (§§ 219.19 through 219.21). The strategy must require monitoring of appropriate plan decisions and characteristics of sustainability. (1) Monitoring and evaluation of ecological sustainability. The plan monitoring strategy for the monitoring and evaluation of ecological sustainability must...
77 FR 45965 - Determination of Attainment for the Paul Spur/Douglas PM10
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-02
... plans, and based on the findings of our technical system audit report, ADEQ's monitoring network meets... to EPA's Air Quality System (AQS) database as quality- assured. Next, we reviewed the ambient PM 10...
Determination of Section 404 Permit and Habitat Mitigation Requirements
DOT National Transportation Integrated Search
2012-09-01
The Arizona Department of Transportation (ADOT) is committed to developing habitat, mitigation, : monitoring, and maintenance plans that replace the loss of the functions and values of an area and : are self-sustaining, thereby providing long-term co...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC
2009-09-01
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holland, R.C.
This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.
Application of remote sensing to state and regional problems
NASA Technical Reports Server (NTRS)
Miller, W. F.; Clark, J. R.; Solomon, J. L.; Duffy, B.; Minchew, K.; Wright, L. H. (Principal Investigator)
1981-01-01
The objectives, accomplishments, and future plans of several LANDSAT applications projects in Mississippi are discussed. The applications include land use planning in Lowandes County, strip mine inventory and reclamation, white tailed deer habitat evaluation, data analysis support systems, discrimination of forest habitats in potential lignite areas, changes in gravel operations, and determination of freshwater wetlands for inventory and monitoring. In addition, a conceptual design for a LANDSAT based information system is discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-07
... finalizing a determination that the Ogden City nonattainment area in Utah is currently attaining the 24-hour... monitoring data for the years 2009 through 2011. The State of Utah submitted a letter dated March 30, 2000... attaining the 24-hour PM 10 NAAQS based on certified and quality-assured data from the most recent three...
Using the pallet costing system to determine costs and stay competitive in the pallet industry
A. Jefferson Jr. Palmer; Bruce G. Hansen; Bruce G. Hansen
2002-01-01
In order to stay competitive and keep production costs at a minimum, wood pallet manufacturers must plan, monitor, and control their various production activities. Cost information on pallet manufacturing operations, must be gathered and analyzed so that the plant manager can determine whether certain activities are efficient and profitable. The Pallet Costing System (...
50 CFR 216.275 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...
Coskun, H Gonca; Alganci, Ugur; Usta, Gokce
2008-11-13
Accurate and timely information about land use and land cover (LULC) and its changes in urban areas are crucial for urban land management decision-making, ecosystem monitoring and urban planning. Also, monitoring and representation of urban sprawl and its effects on the LULC patterns and hydrological processes of an urbanized watershed is an essential part of water resource planning and management. This paper presents an image analysis study using multi temporal digital satellite imagery of LULC and changes in the Kucukcekmece Watershed (Metropolitan Istanbul, Turkey) from 1992 to 2006. The Kucukcekmece Basin includes portions of the Kucukcekmece District within the municipality of Istanbul so it faces a dramatic urbanization. An urban monitoring analysis approach was first used to implement a land cover classification. A change detection method controlled with ground truth information was then used to determine changes in land cover. During the study period, the variability and magnitude of hydrological components based on land-use patterns were cumulatively influenced by urban sprawl in the watershed. The proposed approach, which uses a combination of Remote Sensing (RS) and Geographical Information System (GIS) techniques, is an effective tool that enhances land-use monitoring, planning, and management of urbanized watersheds.
Coskun, H. Gonca; Alganci, Ugur; Usta, Gokce
2008-01-01
Accurate and timely information about land use and land cover (LULC) and its changes in urban areas are crucial for urban land management decision-making, ecosystem monitoring and urban planning. Also, monitoring and representation of urban sprawl and its effects on the LULC patterns and hydrological processes of an urbanized watershed is an essential part of water resource planning and management. This paper presents an image analysis study using multi temporal digital satellite imagery of LULC and changes in the Kucukcekmece Watershed (Metropolitan Istanbul, Turkey) from 1992 to 2006. The Kucukcekmece Basin includes portions of the Kucukcekmece District within the municipality of Istanbul so it faces a dramatic urbanization. An urban monitoring analysis approach was first used to implement a land cover classification. A change detection method controlled with ground truth information was then used to determine changes in land cover. During the study period, the variability and magnitude of hydrological components based on land-use patterns were cumulatively influenced by urban sprawl in the watershed. The proposed approach, which uses a combination of Remote Sensing (RS) and Geographical Information System (GIS) techniques, is an effective tool that enhances land-use monitoring, planning, and management of urbanized watersheds. PMID:27873924
75 FR 65995 - Biomass Crop Assistance Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-27
... practices approved through conservation planning would be periodically monitored by USDA to determine the... negative impacts, through reduced purchases of inputs for traditional farming, within a region ranging from... changes in land management associated with the adoption of dedicated biomass energy cropping practices and...
Vikhlyaeva, E; Nikolaeva, E; Brandrup-Lukanow, A
2001-12-01
To explore the main determinants of the reproductive behavior of nursing mothers, all inhabitants of the central part of the European region of the Russian Federation, their use of modern contraceptive methods and their attitude to future family planning. Open cohort multicenter study of 1200 nursing mothers aged 16-42 years interviewed at 3-5 days' postpartum, with subsequent longitudinal monitoring ofthe majority in the local family planning centers during the 2 years after labor. The main determinants of the reproductive behavior of this cohort of women are an early debut of sexual activity, several partners in their reproductive history, relatively early marriage with a motivation to have one child in their family and the tendency to use induced abortion as one of the methods of birth regulation. Our experience of postpartum counselling demonstrated positive changes in the women's attitudes to modern contraceptive methods. The data reveal that the induced abortion rate among 639 mothers regularly followed-up during the first year postpartum was 4.4%, and among 606 during the second year was 5.1%. The corresponding rates among 129 women who did not visit the family planning centers and who were only interviewed 2 years after labor were 9.3% and 8.5%, respectively. Our data show that the unmet needs are remarkably concentrated among women who have given birth within the last year or two, and who need augmented attention from the family planning and reproductive health services.
Ranch business planning and resource monitoring for rangeland sustainability
Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite
2012-01-01
Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...
Welsh, Emma J; Carr, Robin
2015-09-27
We became aware through talking with people with asthma that some are using pulse oximeters to monitor their own blood oxygen levels during an asthma attack. Pulse oximeters are marketed by some suppliers as essential equipment for the home medicine cabinet. We wanted to find out if reliable evidence is available on use of pulse oximeters to self monitor asthma exacerbations at home. We decided to include only trials that used pulse oximeters as part of a personalised asthma action plan because it is important that decisions are made on the basis of symptoms as well as oxygen saturation, and that patients have a clear protocol to follow when their asthma worsens. To determine whether pulse oximeters used as part of a personalised asthma action plan for people with asthma are safer and more effective than a personalised asthma action plan alone. We searched the Cochrane Airways Group Specialised Register (CAGR), which includes reports identified through systematic searches of bibliographic databases including the Cochrane Central Register of Controlled Trials (CENTRAL), MEDLINE, EMBASE, the Cumulative Index to Nursing and Allied Health Literature (CINAHL), the Allied and Complementary Medicine Database (AMED) and PsycINFO, and by handsearching. We also searched ClinicalTrials.gov and the World Health Organization (WHO) trials portal. We planned to include randomised controlled trials (RCTs). Participants would have included adults, children or both with a diagnosis of asthma. We planned to include trials in which investigators compared participants who used pulse oximeters to monitor oxygen levels at home during an asthma exacerbation as part of a personalised asthma action plan (PAAP) versus those who used a PAAP without a pulse oximeter. We planned to include studies involving people receiving any treatment regimen provided that no medicine was included as part of the randomisation schedule. We planned to use standard methods as recommended by The Cochrane Collaboration. We found no studies and no evidence to support or refute the use of home pulse oximetry in self management of asthma; therefore, we can make no recommendations about use of a pulse oximeter as part of a PAAP. We found no reliable data to support or refute patient use of pulse oximeters to monitor oxygen saturation levels when experiencing an asthma attack. People should not use a pulse oximeter without seeking advice from a qualified healthcare professional.We identified no compelling rationale for home monitoring of oxygen levels in isolation for most people with asthma. Some people have a reduced perception of the severity of their own breathlessness when exposed to hypoxia. If trials on self monitoring of oxygen levels in the blood by pulse oximeter at home by people with asthma are conducted, the pulse oximeter must be given as part of a personalised asthma action plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
2006-01-01
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2006 will be in accordance with DOE Order 540.1 requirements and the following goals: {sm_bullet} to maintain surveillance of existing and potential groundwater contamination sources; {sm_bullet} to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; {sm_bullet} to identify and characterize long-term trends in groundwater quality at Y-12; and ! to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2006 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2006 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2006 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. The monitoring frequency and selection criteria for each sampling location is in Appendix C. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix D. If issued, addenda to this plan will be inserted in Appendix E, and Groundwater Monitoring Schedules (when issued) will be inserted in Appendix F. Guidance for managing purged groundwater is provided in Appendix G.« less
An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West
Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.
2011-01-01
Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.
49 CFR 192.631 - Control room management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to exceed 15 months; and (5) Establish and implement procedures for when a different controller..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...
Liber, Alex C; Drope, Jeffrey M; Graetz, Ilana; Waters, Teresa M; Kaplan, Cameron M
2015-11-01
In 2014, few health insurance plans sold in the Affordable Care Act's Federally Facilitated Marketplaces had age-dependent tobacco surcharges, possibly because of a system glitch. The 2015 tobacco surcharges show wide variation, with more plans implementing tobacco surcharges that increase with age. This underscores concerns that older tobacco users will find postsubsidy health insurance premiums difficult to afford. Future monitoring of enrollment will determine whether tobacco surcharges cause adverse selection by dissuading tobacco users, particularly older users, from buying health insurance.
40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63
Code of Federal Regulations, 2014 CFR
2014-07-01
... SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring system...) Written procedures for continuous monitoring systems Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance evaluation Yes...
Panunzio, Michele F; Antoniciello, Antonietta; Pisano, Alessandra
2007-03-01
Within the realm of evaluating self-monitoring plans, developed based on the Hazard Analysis and Critical Control Points (HACCP) method and adopted by food companies, little research has been done concerning the quality of the plans. The Servizio di Igiene degli Alimenti e della Nutrizione (Food and Nutrition Health Service) of the Local Health Authority of Foggia, Italy, has conducted research with the aim to adopt a system of indexes and indicators for the qualitative evaluation of HACCP plans. The critical areas considered were the following: simplicity, specificity, feasibility and adherence. During the period from January 2004 to June 2005, the evaluation grid was used in examining 250 HACCP self-monitoring plans of food companies. For the analysis of the determining factor four groups were considered, with reference to HACCP self-monitoring plans designed: group 1 - with the aid of a qualified team; group 2 - with the aid of an unqualified team; group 3 - with the aid of an unqualified expert; group 4 - without the aid of an expert. The mean values of the measures elaborated decrease towards insufficiency moving from group 1 to group 4. In particular, collaboration by teams of unqualified experts brought about drafting unacceptable HACCP plans on the levels of specificity and adherence, with respect to the HACCP method. The method proposed of the analysis of the indexes and indicators beginning with an evaluation sheet can also help the individual company to better adjust contribution by internal or external professionals to the company.
Disease management to promote blood pressure control among African Americans.
Brennan, Troyen; Spettell, Claire; Villagra, Victor; Ofili, Elizabeth; McMahill-Walraven, Cheryl; Lowy, Elizabeth J; Daniels, Pamela; Quarshie, Alexander; Mayberry, Robert
2010-04-01
African Americans have a higher prevalence of hypertension and poorer cardiovascular and renal outcomes than white Americans. The objective of this study was to determine whether a telephonic nurse disease management (DM) program designed for African Americans is more effective than a home monitoring program alone to increase blood pressure (BP) control among African Americans enrolled in a national health plan. A prospective randomized controlled study (March 2006-December 2007) was conducted, with 12 months of follow-up on each subject. A total of 5932 health plan members were randomly selected from the population of self-identified African Americans, age 23 and older, in health maintenance organization plans, with hypertension; 954 accepted, 638 completed initial assessment, and 485 completed follow-up assessment. The intervention consisted of telephonic nurse DM (intervention group) including educational materials, lifestyle and diet counseling, and home BP monitor vs. home BP monitor alone (control group). Measurements included proportion with BP < 120/80, mean systolic BP, mean diastolic BP, and frequency of BP self-monitoring. Results revealed that systolic BP was lower in the intervention group (adjusted means 123.6 vs. 126.7 mm Hg, P = 0.03); there was no difference for diastolic BP. The intervention group was 50% more likely to have BP in control (odds ratio [OR] = 1.50, 95% confidence interval [CI] 0.997-2.27, P = 0.052) and 46% more likely to monitor BP at least weekly (OR 1.46, 95% CI 1.07-2.00, P = 0.02) than the control group. A nurse DM program tailored for African Americans was effective at decreasing systolic BP and increasing the frequency of self-monitoring of BP to a greater extent than home monitoring alone. Recruitment and program completion rates could be improved for maximal impact.
Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less
Untoro, Juliawati; Childs, Rachel; Bose, Indira; Winichagoon, Pattanee; Rudert, Christiane; Hall, Andrew; de Pee, Saskia
2017-10-01
Adequate nutrient intake is a prerequisite for achieving good nutrition status. Suboptimal complementary feeding practices are a main risk factor for stunting. The need for systematic and user-friendly tools to guide the planning, implementation, monitoring, and evaluation of dietary interventions for children aged 6-23 months has been recognized. This paper describes five tools, namely, ProPAN, Optifood, Cost of the Diet, Fill the Nutrient Gap, and Monitoring Results for Equity System that can be used in different combinations to improve situation analysis, planning, implementation, monitoring, or evaluation approaches for complementary feeding in a particular context. ProPAN helps with development of strategies and activities designed to change the behaviours of the target population. Optifood provides guidance for developing food-based recommendations. The Cost of the Diet can provide insight on economic barriers to accessing a nutritious and balanced diet. The Fill the Nutrient Gap facilitates formulation of context-specific policies and programmatic approaches to improve nutrient intake, through a multistakeholder process that uses insights from linear programming and secondary data. The Monitoring Results for Equity System helps with analysis of gaps, constraints, and determinants of complementary feeding interventions and adoption of recommended practices especially in the most vulnerable and deprived populations. These tools, and support for their use, are readily available and can be used either alone and/or complementarily throughout the programme cycle to improve infant and young child-feeding programmes at subnational and national levels. © 2017 John Wiley & Sons Ltd.
Facility effluent monitoring plan for the plutonium uranium extraction facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiegand, D.L.
A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less
Fehring, Richard J; Schneider, Mary; Raviele, Kathleen; Rodriguez, Dana; Pruszynski, Jessica
2013-07-01
The aim was to compare the efficacy and acceptability of two Internet-supported fertility-awareness-based methods of family planning. Six hundred and sixty-seven women and their male partners were randomized into either an electronic hormonal fertility monitor (EHFM) group or a cervical mucus monitoring (CMM) group. Both groups utilized a Web site with instructions, charts and support. Acceptability was assessed online at 1, 3 and 6 months. Pregnancy rates were determined by survival analysis. The EHFM participants (N=197) had a total pregnancy rate of 7 per 100 users over 12 months of use compared with 18.5 for the CMM group (N=164). The log rank survival test showed a significant difference (p<.01) in survival functions. Mean acceptability for both groups increased significantly over time (p<.0001). Continuation rates at 12 months were 40.6% for the monitor group and 36.6% for the mucus group. In comparison with the CMM, the EHFM method of family planning was more effective. All users had an increase in acceptability over time. Results are tempered by the high dropout rate. Copyright © 2013 Elsevier Inc. All rights reserved.
Vandergast, Amy G.
2017-06-02
Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.
David E. Busch; Jon R. Martin
2006-01-01
Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...
49 CFR 192.631 - Control room management.
Code of Federal Regulations, 2012 CFR
2012-10-01
... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...
49 CFR 192.631 - Control room management.
Code of Federal Regulations, 2011 CFR
2011-10-01
... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...
49 CFR 192.631 - Control room management.
Code of Federal Regulations, 2014 CFR
2014-10-01
... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...
49 CFR 192.631 - Control room management.
Code of Federal Regulations, 2013 CFR
2013-10-01
... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...
Looking Ahead: A Report on the Latest Survey Results.
ERIC Educational Resources Information Center
Technology & Learning, 1995
1995-01-01
Reports on the results of a survey of software publishers and market researchers for educators that was conducted to determine development, purchasing, and upgrading plans for educational computer technology. Highlights include operating systems, including Macintosh, DOS, and Windows; equipment needs, including memory, monitors, and special…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2009 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination andmore » determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2009 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2009 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2009 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information.« less
Idaho Habitat Evaluation for Off-Site Mitigation Record : Annual Report 1988.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Idaho. Dept. of Fish and Game.
1990-03-01
The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead and chinook in the Clearwater and Salmon subbasins since 1984. Projects included in the monitoring are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia Rivers. This monitoring project is also funded under the same authority. A mitigation record is being developed to use actual and potential increases in smolt production as the best measures of benefit frommore » a habitat improvement project. This project is divided into two subprojects: general and intensive monitoring. Primary objectives of the general monitoring subproject are to determine natural production increases due to habitat improvement projects in terms of parr production and to determine natural production status and trends in Idaho. The second objective is accomplished by combining parr density from monitoring and evaluation of BPA habitat projects and from other IDFG management and research activities. The primary objective of the intensive monitoring subproject is to determine the relationships between spawning escapement, parr production, and smolt production in two Idaho streams; the upper Salmon River and Crooked River. Results of the intensive monitoring will be used to estimate mitigation benefits in terms of smolt production and to interpret natural production monitoring in Idaho. 30 refs., 19 figs., 34 tabs.« less
Management information systems in the HMO environment.
Neal, P A
1982-01-01
Realization of the unique potential of a health maintenance organization is dependent on the availability of adequate, accurate, and timely information. The particular data needed are determined by the structure of the organization; the physician compensation plans; requirements for state, federal, or other reporting; and many other factors. The author introduces the concept and objectives of the HMO, and presents the management information systems necessary for planning and monitoring HMO performance: patient information, utilization information, and management information for the staff and nonstaff HMO.
NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398
DOE Office of Scientific and Technical Information (OSTI.GOV)
McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.
2013-07-01
Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities inmore » the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely NRC's role will change from doing both consultation and monitoring to being focused on monitoring activities within NDAA. DOE has identified other activities at the Hanford Nuclear Reservation that would continue consultation activities but outside of the NDAA in the future. During the past seven years of consultations and monitoring a number of lessons learned about the process, communication issues, and technical guidance have been identified. With the change in focus from reviewing initial performance assessments and draft waste determinations to long-term monitoring (e.g., individual waste tank closure, at F Tank Farm or complete tank farm closure at INTEC expected in the near future), the NRC is going to revise and update its guidance over the next few years to reflect the lessons learned and the change in focus. In addition to the lessons learned, improvements in the guidance will have to account possible rule and guidance changes underway within Part 61. This paper will discuss the initial plans, approaches, and time lines to revise the guidance within NUREG-1854, including opportunities for public involvement. (authors)« less
Monitoring and evaluation plan for the Nez Perce Tribal Hatchery
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steward, C.R.
1996-08-01
The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and releasedmore » under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan, the 1995 Supplement to the Master Plan, and the Nez Perce Tribal Hatchery Program Environmental Impact Statement. The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts.« less
Wesolowski, Edwin A.
2000-01-01
This report presents a proposal for conducting a water-quality modeling study at drought streamflow, a detailed comprehensive plan for collecting the data, and an annual drought-formation monitoring plan. A 30.8 mile reach of the Red River of the North receives treated wastewater from plants at Fargo, North Dakota, and Moorhead, Minnesota, and streamflow from the Sheyenne River. The water-quality modeling study will evaluate the effects of continuous treated-wastewater discharges to the study reach at drought streamflow. The study will define hydraulic characteristics and reaeration and selected reaction coefficients and will calibrate and verity a model.The study includes collecting synoptic water-quality samples for various types of analyses at a number of sites in the study reach. Dye and gas samples will be collected for traveltime and reaeration measurements. Using the Lagrangian reference frame, synoptic water-quality samples will be collected for analysis of nutrients, chlorophyll a, alkalinity, and carbonaceous biochemical oxygen demand. Field measurements will be made of specific conductance, pH, air and water temperature, dissolved oxygen, and sediment oxygen demand. Two sets of water-quality data will be collected. One data set will be used to calibrate the model, and the other data set will be used to verity the model.The DAFLOW/BLTM models will be used to evaluate the effects of the treated wastewater on the water quality of the river. The model will simulate specific conductance, temperature, dissolved oxygen, carbonaceous biochemical oxygen demand, total nitrogen (organic, ammonia, nitrite, nitrate), total orthophosphorus, total phosphorus, and phytoplankton as chlorophyll a.The work plan identifies and discusses the work elements needed for accomplishing the data collection for the study. The work elements specify who will provide personnel, vehicles, instruments, and supplies needed during data collection. The work plan contains instructions for data collection; inventory lists of needed personnel, vehicles, instruments, and supplies; and examples of computations for determining quantities of tracer to be injected into the stream. The work plan also contains an annual drought-formation monitoring plan that includes a 9-month time line that specifies when essential planning actions must occur before actual project start up. Drought streamflows are rare. The annual drought-formation monitoring plan is presented to assist project planning by providing early warning that conditions are favorable to produce drought streamflow. The plan to monitor drought-forming conditions discusses the drought indices to be monitored. To establish a baseline, historic values for some of the drought indices for selected years were reviewed. An annual review of the drought indices is recommended.
Region 7 States Air Quality Monitoring Plans - Iowa
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Missouri
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Nebraska
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Kansas
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tateoka, K; Graduate School of Medicine, Sapporo Medical University, Sapporo, JP; Fujimomo, K
2014-06-01
Purpose: The aim of the study is to evaluate the use of Varian DynaLog files to verify VMAT plans delivery and modulation complexity score (MCS) of VMAT. Methods: Delivery accuracy of machine performance was quantified by multileaf collimator (MLC) position errors, gantry angle errors and fluence delivery accuracy for volumetric modulated arc therapy (VMAT). The relationship between machine performance and plan complexity were also investigated using the modulation complexity score (MCS). Plan and Actual MLC positions, gantry angles and delivered fraction of monitor units were extracted from Varian DynaLog files. These factors were taken from the record and verify systemmore » of MLC control file. Planned and delivered beam data were compared to determine leaf position errors and gantry angle errors. Analysis was also performed on planned and actual fluence maps reconstructed from those of the DynaLog files. This analysis was performed for all treatment fractions of 5 prostate VMAT plans. The analysis of DynaLog files have been carried out by in-house programming in Visual C++. Results: The root mean square of leaf position and gantry angle errors were about 0.12 and 0.15, respectively. The Gamma of planned and actual fluence maps at 3%/3 mm criterion was about 99.21. The gamma of the leaf position errors were not directly related to plan complexity as determined by the MCS. Therefore, the gamma of the gantry angle errors were directly related to plan complexity as determined by the MCS. Conclusion: This study shows Varian dynalog files for VMAT plan can be diagnosed delivery errors not possible with phantom based quality assurance. Furthermore, the MCS of VMAT plan can evaluate delivery accuracy for patients receiving of VMAT. Machine performance was found to be directly related to plan complexity but this is not the dominant determinant of delivery accuracy.« less
San Diego Multiple Species Conservation Program (MSCP) Rare Plant Monitoring Review and Revision
McEachern, Kathryn; Pavlik, Bruce M.; Rebman, Jon; Sutter, Rob
2007-01-01
Introduction The San Diego Multiple Species Conservation Program (MSCP) was developed for the conservation of plants and animals in the south part of San Diego County, under the California Natural Community Conservation Planning Act of 1991 (California Department of Fish and Game) and the Federal Endangered Species Act of 1973, as amended (16 U.S. Code 1531-1544.) The Program is on the leading edge of conservation, as it seeks to both guide development and conserve at-risk species with the oversight of both State and Federal agencies. Lands were identified for inclusion in the MSCP based on their value as habitat for at-risk plants or plant communities (Natural Community Conservation Planning, 2005). Since its inception in the mid-1990s the Program has protected over 100,000 acres, involving 15 jurisdictions and the U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Game (CDFG) in the conservation of 87 taxa. Surveys for covered species have been conducted, and management and monitoring have been implemented at some high priority sites. Each jurisdiction or agency manages and monitors their conservation areas independently, while collaborating regionally for long-term protection. The San Diego MSCP is on the forefront of conservation, in one of the most rapidly growing urban areas of the country. The planning effort that developed the MSCP was state-of-the-art, using expert knowledge, spatial habitat modeling, and principles of preserve design to identify and prioritize areas for protection. Land acquisition and protection are ahead of schedule for most jurisdictions. Surveys have verified the locations of many rare plant populations known from earlier collections, and they provide general information on population size and health useful for further conservation planning. Management plans have been written or are in development for most MSCP parcels under jurisdictional control. Several agencies are developing databases for implementation and management tracking. In many ways this program is at the cutting edge of regional conservation, testing concepts, developing techniques, and demonstrating conservation effectiveness in new and uncharted ways. Periodic program review is crucial to the continued success of the program, as it moves from a phase of planning and acquisition to one of management and monitoring. Ecological monitoring is the key to assessing the success of the protection and management implemented at each individual reserve and for the MSCP as a whole. The ultimate goal of the Program is conservation of at-risk taxa and their habitats, as well as underlying ecological processes that contribute to sustainability of the ecosystem. Monitoring guidelines and timetables were developed by Ogden Environmental and Energy Services Co., Inc. (1996), and reviewed by Conservation Biology Institute (2001). The Program is in transition now, from the initial stage of land protection to one of land management and monitoring to determine population responses to management regimes. Several agencies have already invested substantial effort in status and trend monitoring, while others are developing their monitoring plans. Management is ongoing at several sites. With both management and monitoring, collaboration and coordination among jurisdictions can be especially fruitful in conserving resources and maximizing success.
50 CFR 216.175 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...
Bennett, Trudy J.; Graham, Jennifer L.; Foster, Guy M.; Stone, Mandy L.; Juracek, Kyle E.; Rasmussen, Teresa J.; Putnam, James E.
2014-01-01
A quality-assurance plan for use in conducting continuous water-quality monitoring activities has been developed for the Kansas Water Science Center in accordance with guidelines set forth by the U.S. Geological Survey. This quality-assurance plan documents the standards, policies, and procedures used by the U.S. Geological Survey in Kansas for activities related to the collection, processing, storage, analysis, and release of continuous water-quality monitoring data. The policies and procedures that are documented in this quality-assurance plan for continuous water-quality monitoring activities complement quality-assurance plans for surface-water and groundwater activities in Kansas.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Michael G.
This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.
40 CFR 75.53 - Monitoring plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...
40 CFR 75.53 - Monitoring plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
NASA Astrophysics Data System (ADS)
Cheong, Kwang-Ho; Lee, Me-Yeon; Kang, Sei-Kwon; Yoon, Jai-Woong; Park, Soah; Hwang, Taejin; Kim, Haeyoung; Kim, Kyoung Ju; Han, Tae Jin; Bae, Hoonsik
2015-07-01
The aim of this study is to set up statistical quality control for monitoring the volumetric modulated arc therapy (VMAT) delivery error by using the machine's log data. Eclipse and a Clinac iX linac with the RapidArc system (Varian Medical Systems, Palo Alto, USA) are used for delivery of the VMAT plan. During the delivery of the RapidArc fields, the machine determines the delivered monitor units (MUs) and the gantry angle's position accuracy and the standard deviations of the MU ( σMU: dosimetric error) and the gantry angle ( σGA: geometric error) are displayed on the console monitor after completion of the RapidArc delivery. In the present study, first, the log data were analyzed to confirm its validity and usability; then, statistical process control (SPC) was applied to monitor the σMU and the σGA in a timely manner for all RapidArc fields: a total of 195 arc fields for 99 patients. The MU and the GA were determined twice for all fields, that is, first during the patient-specific plan QA and then again during the first treatment. The sMU and the σGA time series were quite stable irrespective of the treatment site; however, the sGA strongly depended on the gantry's rotation speed. The σGA of the RapidArc delivery for stereotactic body radiation therapy (SBRT) was smaller than that for the typical VMAT. Therefore, SPC was applied for SBRT cases and general cases respectively. Moreover, the accuracy of the potential meter of the gantry rotation is important because the σGA can change dramatically due to its condition. By applying SPC to the σMU and σGA, we could monitor the delivery error efficiently. However, the upper and the lower limits of SPC need to be determined carefully with full knowledge of the machine and log data.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-30
...\\ Furthermore, we concluded in our Technical System Audit Report concerning ADEQ's ambient air quality... Monitoring Network Plan: For the Year 2011''). \\7\\ Technical System Audit Report transmitted via... an ``anonymous access'' system, and EPA will not know your identity or contact information unless you...
A Small District's Quest for Survival.
ERIC Educational Resources Information Center
Salinas, Claudio
In Texas, a financially troubled school district must submit a plan of action to the Texas Education Agency (TEA) for improving its financial situation without harming the quality of education delivered. If things get worse, TEA assigns a financial monitor to advise the district on overcoming its financial problems and to determine if further…
40 CFR 52.1100 - Original identification of plan section.
Code of Federal Regulations, 2012 CFR
2012-07-01
... establish an Ambient Air Quality Monitoring Network. (45) Recodification of the Maryland Regulations... Practice (GEP) Stack Height Regulations, COMAR 10.18.01.08 (Determination of Ground Level Concentrations... consumption analysis. The amendments to COMAR 26.11.01.01, 26.11.02.10 (C)(9), and 26.11.06.14 were effective...
The demonstration of technologies for determining the presence of dioxin in soil and sediment is being conducted under the U.S. Environmental Protection Agency Superfund Innovative Technology Evaluation Program in Saginaw, Michigan, at Green Point Environmental Learning Center fr...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... Massachusetts Department of Environmental Protection performed a missing data analysis for each site with low... Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors... with missing ozone data, the ozone levels, if captured, would have been below the 1997 8-hour ozone...
ERIC Educational Resources Information Center
Carter, Sharon D.
2013-01-01
This qualitative case study investigated the process of teaching the self-management strategies, self-determination, and self-monitoring to chronically misbehaved students from the perspective of a secondary special education teacher. The investigation used a purposeful sample to select an urban high school setting and a tenured special education…
49 CFR 195.446 - Control room management.
Code of Federal Regulations, 2011 CFR
2011-10-01
... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...
49 CFR 195.446 - Control room management.
Code of Federal Regulations, 2014 CFR
2014-10-01
... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...
49 CFR 195.446 - Control room management.
Code of Federal Regulations, 2012 CFR
2012-10-01
... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...
49 CFR 195.446 - Control room management.
Code of Federal Regulations, 2013 CFR
2013-10-01
... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...
40 CFR 98.343 - Calculating GHG emissions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... landfill using paragraph (a)(3)(i) of this section for all containers and for all vehicles used to haul... determine the annual quantity of waste disposed of must be documented in the monitoring plan. (i) Use direct... methods: (A) Weigh using mass scales each vehicle or container used to haul waste as it enters the...
40 CFR 98.343 - Calculating GHG emissions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... landfill using paragraph (a)(3)(i) of this section for all containers and for all vehicles used to haul... determine the annual quantity of waste disposed of must be documented in the monitoring plan. (i) Use direct... methods: (A) Weigh using mass scales each vehicle or container used to haul waste as it enters the...
40 CFR 98.343 - Calculating GHG emissions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... landfill using paragraph (a)(3)(i) of this section for all containers and for all vehicles used to haul... determine the annual quantity of waste disposed of must be documented in the monitoring plan. (i) Use direct... methods: (A) Weigh using mass scales each vehicle or container used to haul waste as it enters the...
40 CFR 52.2220 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Coke Battery Underfire (combustion) Stacks 06/07/92 08/15/97, 62 FR 43643 CHAPTER 1200-3-6NON-PROCESS... Destruction or Removal Efficiency and Monitoring Requirements 05/18/93 02/27/95, 60 FR 10504 Section 1200-3-18-.84 Test Methods and Compliance Procedures: Determining the Destruction or Removal Efficiency of a...
Joint Annual Forest Inventory and Monitoring System
Ronald E. McRoberts
1999-01-01
The Renewable Forest and Rangeland Resources Planning Act of 1978 requires that the USDA Forest Service conduct periodic inventories of forestland in the United States to determine its extent and condition and the volume of standing timber, timber growth, and timber depletions. Five separate Forest Inventory and Analysis (FIA) programs, located in USDA Forest Service...
Brian Buma; Jennifer K Costanza; Kurt Riitters
2017-01-01
The scale of investigation for disturbanceinfluenced processes plays a critical role in theoretical assumptions about stability, variance, and equilibrium, as well as conservation reserve and long-term monitoring program design. Critical consideration of scale is required for robust planning designs, especially when anticipating future disturbances whose exact...
J. John Stadt; Jim Schieck; Harry Stelfox
2006-01-01
The Alberta Biodiversity Monitoring Program is a rigorous science-based initiative that is being developed to monitor and report on biodiversity status and trends throughout the province of Alberta, Canada. Forest management plans in Alberta are required to monitor and report on the achievement of stated sustainable forest management objectives; however, the...
Urban and regional planning proposal no. Y-10-066-001
NASA Technical Reports Server (NTRS)
Hannah, J. W.; Thomas, G. L.; Esparza, F. (Principal Investigator)
1973-01-01
The author has identified the following significant results. An investigation is underway to determine the applicability of ERTS-1 data to urban and regional planning problems, using data for East Central Florida. Small scale land use mapping is feasible. Urban and commercial areas are sufficiently distinguishable that ERTS-1 appears to be a useful tool for monitoring urban and commercial growth. Development patterns of cities, growth patterns of cities, and distribution and changes in certain sectors within cities can be analyzed effectively. Digital analysis methods are proving useful.
A Planning Approach for Developing Inventory and Monitoring Programs In National Parks
David L. Peterson; David G. Silsbee; Daniel L. Schmoldt
1995-01-01
This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...
24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.
Code of Federal Regulations, 2010 CFR
2010-04-01
... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the...'s reports. Each sales or rental report shall be reviewed by the monitoring office as it is received. When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
Remote sensing of coal mine pollution in the upper Potomac River basin
NASA Technical Reports Server (NTRS)
1974-01-01
A survey of remote sensing data pertinent to locating and monitoring sources of pollution resulting from surface and shaft mining operations was conducted in order to determine the various methods by which ERTS and aircraft remote sensing data can be used as a replacement for, or a supplement to traditional methods of monitoring coal mine pollution of the upper Potomac Basin. The gathering and analysis of representative samples of the raw and processed data obtained during the survey are described, along with plans to demonstrate and optimize the data collection processes.
Geothermal Monitoring in Yellowstone National Park
NASA Astrophysics Data System (ADS)
Heasler, H. P.; Jaworowski, C.; Susong, D. D.; Lowenstern, J. B.
2007-12-01
When the first exploring parties surveyed the Yellowstone region in the late 19th Century, it was the geologic wonders - geysers, hot springs, mudpots, fumaroles - that captured their imaginations. Because of these treasures, the U.S. Congress set aside and dedicated this land of "natural curiosities" as the world's first "public pleasuring ground". Protection of Yellowstone's unique geothermal features is a key mission of Yellowstone National Park as mandated by U. S. Congressional law. In response to that mandate, the Yellowstone National Park Geology Program developed a peer-reviewed, Geothermal Monitoring Plan in 2003. With partial Congressional funding of the Plan in 2005, implementation of a scientific monitoring effort began. Yellowstone's scientific geothermal monitoring effort includes the acquisition of time-temperature data using electronic data loggers, basic water quality data, chloride flux data, estimates of radiative heat flux using airborne, thermal infrared imagery, geothermal gas monitoring, and the monitoring of groundwater wells. Time- temperature data are acquired for geysers, hot springs, steam vents, wells, rivers, and the ground. Uses of the time-temperature data include public safety, calibrating airborne thermal infrared-imagery, monitoring selected thermal features for potential hydrothermal explosions, and determining the spatial and temporal changes in thermal areas. Since 2003, upgrades of Yellowstone's stream gaging network have improved the spatial and temporal precision of the chloride flux, water quality, and groundwater components of the Geothermal Monitoring Plan. All of these methods serve both for geothermal monitoring and volcano monitoring as part of the Yellowstone Volcano Observatory. A major component of the Geothermal Monitoring Plan is remote sensing of the Yellowstone volcano and its active hydrothermal areas at various scales. The National Center for Landscape Fire Analysis at the University of Montana and the USDA Fire Sciences Lab acquired visible and mid-infrared (3-5 micron) airborne imagery (night and day flights) for Norris Geyser Basin during October 2005 and October 2006. The Remote Sensing Services Laboratory at Utah State University also acquired visible and thermal infrared (8-12 micron) airborne imagery (also day and night flights) for the Upper Geyser Basin, Midway Geyser Basin and Lower Geyser Basin during 2005 and 2006. Montana State University collaborators are analyzing Landsat satellite imagery for park-wide estimates of radiant heat flux and change detection of active geothermal areas. Geothermal gas and groundwater well monitoring efforts were initiated in 2006. The geothermal gas monitoring instrumentation, developed with assistance from both the Yellowstone and Hawaiian Volcano Observatories, measures hydrogen sulfide, carbon dioxide and basic weather parameters. A specially constructed well adjacent to the Norris Geyser Basin measures water temperature, pH, electrical conductivity, and water level.
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
Monitoring plan for vegetation responses to elk management in Rocky Mountain National Park
Zeigenfuss, Linda C.; Johnson, Therese L.; Wiebe, Zachary
2011-01-01
Rocky Mountain National Park (RMNP) in north-central Colorado supports numerous species of wildlife, including several large ungulate species among which Rocky Mountain elk (Cervus elaphus) are the most abundant. Elk are native to RMNP but were extirpated from the area by the late 1800s. They were reintroduced to the area in 1913-1914, and the elk herd grew to the point that it was actively managed from 1944 until 1968. In 1969, the active control of elk was discontinued and since then the herd has increased to a high point ranging from 2,800 to 3,500 between 1997 and 2001. In recent years, there has been growing concern over the condition of vegetation in the park and conflicts between elk and humans, both inside and outside the park. In response to these concerns, RMNP implemented an Elk and Vegetation Management Plan (EVMP) in 2009 to guide management actions in the park over a 20-year time period with the goal of reducing the impacts of elk on vegetation and restoring the natural range of variability in the elk population and affected plant and animal communities. The EVMP outlines the desired future condition for three vegetation communities where the majority of elk herbivory impacts are being observed: aspen, montane riparian willow, and upland herbaceous communities. The EVMP incorporates the principle of adaptive management whereby the effectiveness of management actions is assessed and adjusted as needed to successfully achieve objectives. Determination of whether vegetation objectives are being achieved requires monitoring and evaluation of target vegetation communities. The current report describes the design and implementation of a vegetation-monitoring program to help RMNP managers assess the effectiveness of their management actions and determine when and where to alter actions to achieve the EVMP's vegetation objectives. This monitoring plan details the process of selecting variables to be monitored, overall sampling design and structure, site selection, data collection methods, and statistical analyses to be used to conduct this monitoring program in conjunction with the EVMP. We report the baseline conditions observed at the time of the establishment of monitoring sites. We include detailed field protocols for site establishment and data collection, as well as timetables for sampling, so that RMNP staff will be able to continue monitoring the sites established during this implementation stage, and continue to add new sites when necessary, as the execution of the EVMP proceeds over the next 20 years.
Palta, Mari; Smith, Maureen; Oliver, Thomas R.; DuGoff, Eva H.
2016-01-01
Introduction In 2012, the Centers for Medicare and Medicaid Services (CMS) introduced the Quality Bonus Payment Demonstration, a pay-for-performance (P4P) program, into Medicare Advantage plans. Previous studies documented racial/ethnic disparities in receipt of care among participants in these plans. The objective of this study was to determine whether P4P incentives have affected these disparities in Medicare Advantage plans. Methods We studied 411 Medicare Advantage health plans that participated in the Medicare Health Outcome Survey in 2010 and 2013. Preventive health care was defined as self-reported receipt of health care provider communication or treatment to reduce risk of falling, improve bladder control, and monitor physical activity among individuals reporting these problems. Logistic regression stratified by health care plan was used to examine racial/ethnic disparities in receipt of preventive health care before and after the introduction of the P4P program in 2012. Results We found similar racial/ethnic differences in receipt of preventive health care before and after the introduction of P4P. Blacks and Asians were less likely than whites to receive advice to improve bladder control and more likely to receive advice to reduce risk of falling and improve physical activity. Hispanics were more likely to report receiving advice about all 3 health issues than whites. After the introduction of P4P, the gap decreased between Hispanics and whites for improving bladder control and monitoring physical activity and increased between blacks and whites for monitoring physical activity. Conclusion Racial/ethnic differences in receipt of preventive health care are not always in the expected direction. CMS should consider developing a separate measure of equity in preventive health care services to encourage health plans to reduce gaps among racial/ethnic groups in receiving preventive care services. PMID:27609303
Jung, Daniel H; Palta, Mari; Smith, Maureen; Oliver, Thomas R; DuGoff, Eva H
2016-09-08
In 2012, the Centers for Medicare and Medicaid Services (CMS) introduced the Quality Bonus Payment Demonstration, a pay-for-performance (P4P) program, into Medicare Advantage plans. Previous studies documented racial/ethnic disparities in receipt of care among participants in these plans. The objective of this study was to determine whether P4P incentives have affected these disparities in Medicare Advantage plans. We studied 411 Medicare Advantage health plans that participated in the Medicare Health Outcome Survey in 2010 and 2013. Preventive health care was defined as self-reported receipt of health care provider communication or treatment to reduce risk of falling, improve bladder control, and monitor physical activity among individuals reporting these problems. Logistic regression stratified by health care plan was used to examine racial/ethnic disparities in receipt of preventive health care before and after the introduction of the P4P program in 2012. We found similar racial/ethnic differences in receipt of preventive health care before and after the introduction of P4P. Blacks and Asians were less likely than whites to receive advice to improve bladder control and more likely to receive advice to reduce risk of falling and improve physical activity. Hispanics were more likely to report receiving advice about all 3 health issues than whites. After the introduction of P4P, the gap decreased between Hispanics and whites for improving bladder control and monitoring physical activity and increased between blacks and whites for monitoring physical activity. Racial/ethnic differences in receipt of preventive health care are not always in the expected direction. CMS should consider developing a separate measure of equity in preventive health care services to encourage health plans to reduce gaps among racial/ethnic groups in receiving preventive care services.
Disease Management to Promote Blood Pressure Control Among African Americans
Brennan, Troyen; Villagra, Victor; Ofili, Elizabeth; McMahill-Walraven, Cheryl; Lowy, Elizabeth J.; Daniels, Pamela; Quarshie, Alexander; Mayberry, Robert
2010-01-01
Abstract African Americans have a higher prevalence of hypertension and poorer cardiovascular and renal outcomes than white Americans. The objective of this study was to determine whether a telephonic nurse disease management (DM) program designed for African Americans is more effective than a home monitoring program alone to increase blood pressure (BP) control among African Americans enrolled in a national health plan. A prospective randomized controlled study (March 2006—December 2007) was conducted, with 12 months of follow-up on each subject. A total of 5932 health plan members were randomly selected from the population of self-identified African Americans, age 23 and older, in health maintenance organization plans, with hypertension; 954 accepted, 638 completed initial assessment, and 485 completed follow-up assessment. The intervention consisted of telephonic nurse DM (intervention group) including educational materials, lifestyle and diet counseling, and home BP monitor vs. home BP monitor alone (control group). Measurements included proportion with BP < 120/80, mean systolic BP, mean diastolic BP, and frequency of BP self-monitoring. Results revealed that systolic BP was lower in the intervention group (adjusted means 123.6 vs. 126.7 mm Hg, P = 0.03); there was no difference for diastolic BP. The intervention group was 50% more likely to have BP in control (odds ratio [OR] = 1.50, 95% confidence interval [CI] 0.997–2.27, P = 0.052) and 46% more likely to monitor BP at least weekly (OR 1.46, 95% CI 1.07–2.00, P = 0.02) than the control group. A nurse DM program tailored for African Americans was effective at decreasing systolic BP and increasing the frequency of self-monitoring of BP to a greater extent than home monitoring alone. Recruitment and program completion rates could be improved for maximal impact. (Population Health Management 2010;13:65–72) PMID:20415618
Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)
NASA Technical Reports Server (NTRS)
1992-01-01
Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.
40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63
Code of Federal Regulations, 2013 CFR
2013-07-01
... to develop SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring... to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance...)(iv), (b)(2)(v) Actions taken to minimize emissions during SSM No. § 63.10(b)(2)(vi) Recordkeeping for...
Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.
Jonathan Thompson
2007-01-01
The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoringâthe systematic observation and measurement of a set...
Action Research to Support the Sustainability of Strategic Planning
ERIC Educational Resources Information Center
Antheil, Jane H.; Spinelli, Stephen, Jr.
2011-01-01
This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…
Preparation of regional shorebird monitoring plans
Jonathan Bart; Ann Manning; Susan Thomas; Catherine Wightman
2005-01-01
Shorebird monitoring programs in Canada and the United States are being developed under the auspices of PRISM, the Program for Regional and International Shorebird Monitoring. PRISM provides a single blueprint for implementing the monitoring proposals in the shorebird conservation plans prepared recently in Canada and the United States. It includes four segments:...
Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.
2004-01-01
critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.
Richmond, Neil; Tulip, Rachael; Walker, Chris
2016-01-01
The aim of this work was to determine, by measurement and independent monitor unit (MU) check, the optimum method for determining collimator scatter for an Elekta Synergy linac with an Agility multileaf collimator (MLC) within Radcalc, a commercial MU calculation software package. The collimator scatter factors were measured for 13 field shapes defined by an Elekta Agility MLC on a Synergy linac with 6MV photons. The value of the collimator scatter associated with each field was also calculated according to the equation Sc=Sc(mlc)+Sc(corr)(Sc(open)-Sc(mlc)) with Sc(corr) varied between 0 and 1, where Sc(open) is the value of collimator scatter calculated from the rectangular collimator-defined field and Sc(mlc) the value using only the MLC-defined field shape by applying sector integration. From this the optimum value of the correction was determined as that which gives the minimum difference between measured and calculated Sc. Single (simple fluence modulation) and dual-arc (complex fluence modulation) treatment plans were generated on the Monaco system for prostate volumetric modulated-arc therapy (VMAT) delivery. The planned MUs were verified by absolute dose measurement in phantom and by an independent MU calculation. The MU calculations were repeated with values of Sc(corr) between 0 and 1. The values of the correction yielding the minimum MU difference between treatment planning system (TPS) and check MU were established. The empirically derived value of Sc(corr) giving the best fit to the measured collimator scatter factors was 0.49. This figure however was not found to be optimal for either the single- or dual-arc prostate VMAT plans, which required 0.80 and 0.34, respectively, to minimize the differences between the TPS and independent-check MU. Point dose measurement of the VMAT plans demonstrated that the TPS MUs were appropriate for the delivered dose. Although the value of Sc(corr) may be obtained by direct comparison of calculation with measurement, the efficacy of the value determined for VMAT-MU calculations are very much dependent on the complexity of the MLC delivery. Copyright © 2016 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan
ERIC Educational Resources Information Center
Mansell, Michelle
2010-01-01
The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…
40 CFR 63.2987 - What must my operation, maintenance, and monitoring (OMM) plan include?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., maintenance, and monitoring (OMM) plan include? (a) You must prescribe the monitoring that will be performed...) For the burn cycle that follows the inspection, document that the thermal oxidizer is operating...
40 CFR 98.247 - Records that must be retained.
Code of Federal Regulations, 2012 CFR
2012-07-01
....246(b), and records of any annual average HHV calculations. (b) If you comply with the mass balance... in accordance with § 98.243(c)(4). (2) Start and end times and calculated carbon contents for time....243(c)(4) for determining carbon content of feedstock or product. (3) A part of the monitoring plan...
40 CFR 98.247 - Records that must be retained.
Code of Federal Regulations, 2013 CFR
2013-07-01
....246(b), and records of any annual average HHV calculations. (b) If you comply with the mass balance... in accordance with § 98.243(c)(4). (2) Start and end times and calculated carbon contents for time....243(c)(4) for determining carbon content of feedstock or product. (3) A part of the monitoring plan...
40 CFR 98.247 - Records that must be retained.
Code of Federal Regulations, 2011 CFR
2011-07-01
....246(b), and records of any annual average HHV calculations. (b) If you comply with the mass balance... in accordance with § 98.243(c)(4). (2) Start and end times and calculated carbon contents for time....243(c)(4) for determining carbon content of feedstock or product. (3) A part of the monitoring plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-14
... its Technical System Audit of the CARB PQAO (conducted during Summer 2007), that the combined ambient... findings of EPA's Summer 2007 Technical System Audit of CARB's ambient air monitoring program). \\15\\ See, e... through www.regulations.gov or email. www.regulations.gov is an ``anonymous access'' system, and EPA will...
USDA-ARS?s Scientific Manuscript database
Field research studies in Spain conducted to determine the biology of the arundo scale, Rhizaspidiotus donacis, were consistent with laboratory studies conducted in the U.S. Although field data from Spain indicate that the arundo scale can significantly impact giant reed, Arundo donax, additional ti...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-14
... Reformer Unit in a Flare. 1200015 NSPS NNN, RRR Alternative Monitoring Plan Request for the Use of Car... police department during community voluntary take back programs in Arkansas meet the definition of...) instead, which will allow for the use of car seals on closed bypass valves in lieu of flow indicators. To...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... of Environmental Protection performed a missing data analysis for this site in accordance with the regulatory requirements of 40 CFR part 50, Appendix I. The Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors near the Adams site for the missing days to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-14
... in EPA's Air Quality System (AQS) database. To account for missing data, the procedures found in... determination is based upon complete, certified, quality-assured ambient air quality monitoring data for the... proposing? II. What is the background for this proposed action? III. What is EPA's analysis of data for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
...'' particles (e.g., sulfate and nitrate) form in the atmosphere as a result of various chemical reactions. The... chemical reactions to form secondary PM). In most areas of the country, PM 2.5 precursor emissions are... determinations for PM 2.5 NAAQS. These requirements address air quality modeling and monitoring provisions for...
Quality of the ophthalmological service to outpatients of the public and private healthcare systems.
Hercos, Benigno Vicente Santos; Berezovsky, Adriana
2017-01-01
To compare perceptions of the quality of ophthalmological services offered to outpatients from the public healthcare system to those from the private healthcare system, and to determine which measures are seen as necessary and a priority for improving the quality of care. This was a prospective observational study on 200 patients, 101 and 99 of whom were from the public and private healthcare systems, respectively. All patients underwent an ophthalmological examination at an ophthalmology hospital in Belo Horizonte, Minas Gerais, Brazil. Personal interviews were conducted using two structured questionnaires adapted from the modified SERVQUAL scale. Overall, patients from the private healthcare system were significantly more dissatisfied than those from the public healthcare system. In both systems, reliability was considered to be the most important determinant of quality, and it presented the highest level of dissatisfaction. Satisfaction with the public healthcare system was significantly greater than that with the private healthcare system in terms of the tangibles, reliability, responsiveness, and assurance determinants of the SERVQUAL scale. Institutions must plan, execute, evaluate, and monitor measures that seek to improve the overall patient satisfaction with the quality of services provided, particularly in the private healthcare system, and special attention must be paid to reliability in both healthcare systems. The identification and monitoring of the quality of healthcare services through the periodic use of the SERVQUAL scale may provide healthcare managers with information so that they can identify, plan, and monitor necessary and priority measures. This could be a key strategy for improving the quality of outpatient health services in the public and private systems.
Circumpolar biodiversity monitoring program (CBMP): Coastal expert workshop meeting report
Anderson, Rebecca D.; McLennan, Donald; Thomson, Laura; Wegeberg, Susse; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, Stacey; Christensen, Thomas K.; Price, Courtney
2016-01-01
The Coastal Expert Workshop, which took place in Ottawa, Canada from March 1 to 3, 2016, initiated the development of the Arctic Coastal Biodiversity Monitoring Plan (Coastal Plan). Meeting participants, including northern residents, representatives from industry, non-governmental organisations (NGOs), academia, and government regulators and agencies from across the circumpolar Arctic, discussed current biodiversity monitoring efforts, key issues facing biodiversity in Arctic coastal areas, and collectively identified monitoring indicators, or Focal Ecosystem Components (FECs). On February 29, the day before the workshop, a full day was allocated to Traditional Knowledge (TK) holders to meet and elucidate how this important knowledge can be included in the process of building the Coastal Plan and monitoring biodiversity in Arctic coastal areas, along with scientific data and variables. This document provides 1) background information about the Circumpolar Biodiversity Monitoring Programme and the Coastal Expert Monitoring Group, 2) overviews on workshop presentations and breakout sessions, and 3) details regarding outcomes of the workshop that will inform the drafting of the Coastal Plan.
Workie, Demeke Lakew; Zike, Dereje Tesfaye; Fenta, Haile Mekonnen; Mekonnen, Mulusew Admasu
2017-09-01
Unintended pregnancy related to unmet need is a worldwide problem that affects societies. The main objective of this study was to identify the prevalence and determinants of unmet need for family planning among women aged (15-49) in Ethiopia. The Performance Monitoring and Accountability2020/Ethiopia was conducted in April 2016 at round-4 from 7494 women with two-stage-stratified sampling. Bi-variable and multi-variable binary logistic regression model with complex sampling design was fitted. The prevalence of unmet-need for family planning was 16.2% in Ethiopia. Women between the age range of 15-24 years were 2.266 times more likely to have unmet need family planning compared to above 35 years. Women who were currently married were about 8 times more likely to have unmet need family planning compared to never married women. Women who had no under-five child were 0.125 times less likely to have unmet need family planning compared to those who had more than two-under-5. The key determinants of unmet need family planning in Ethiopia were residence, age, marital-status, education, household members, birth-events and number of under-5 children. Thus the Government of Ethiopia would take immediate steps to address the causes of high unmet need for family planning among women.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less
Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper
McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.
2016-01-01
In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.
Methods and apparatus for graphical display and editing of flight plans
NASA Technical Reports Server (NTRS)
Gibbs, Michael J. (Inventor); Adams, Jr., Mike B. (Inventor); Chase, Karl L. (Inventor); Lewis, Daniel E. (Inventor); McCrobie, Daniel E. (Inventor); Omen, Debi Van (Inventor)
2002-01-01
Systems and methods are provided for an integrated graphical user interface which facilitates the display and editing of aircraft flight-plan data. A user (e.g., a pilot) located within the aircraft provides input to a processor through a cursor control device and receives visual feedback via a display produced by a monitor. The display includes various graphical elements associated with the lateral position, vertical position, flight-plan and/or other indicia of the aircraft's operational state as determined from avionics data and/or various data sources. Through use of the cursor control device, the user may modify the flight-plan and/or other such indicia graphically in accordance with feedback provided by the display. In one embodiment, the display includes a lateral view, a vertical profile view, and a hot-map view configured to simplify the display and editing of the aircraft's flight-plan data.
The GMES Sentinel-5 mission for operational atmospheric monitoring: status and developments
NASA Astrophysics Data System (ADS)
Sierk, Bernd; Bezy, Jean-Loup; Caron, Jerôme; Meynard, Roland; Veihelmann, Ben; Ingmann, Paul
2017-11-01
Sentinel-5 is an atmospheric monitoring mission planned in the frame of the joint EU/ESA initiative Global Monitoring for Environment and Security (GMES). The objective of the mission, planned to be launched in 2020, is the operational monitoring of trace gas concentrations for atmospheric chemistry and climate applications.
Chapter 3. Planning and design for habitat monitoring
Christina D. Vojta; Lyman L. McDonald; C. Kenneth Brewer; Kevin S. McKelvey; Mary M Rowland; Michael I. Goldstein
2013-01-01
This chapter provides guidance for designing a habitat monitoring program so that it will meet the monitoring objective, will be repeatable, and will adequately represent habitat within the spatial extent of interest. Although a number of excellent resources are available for planning and designing a monitoring program for wildlife populations (e.g., Busch and Trexler...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, Greg; Marotz, Brian L.; Dunnigan, James
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less
In vivo dosimetry for external photon treatments of head and neck cancers by diodes and TLDS.
Tung, C J; Wang, H C; Lo, S H; Wu, J M; Wang, C J
2004-01-01
In vivo dosimetry was implemented for treatments of head and neck cancers in the large fields. Diode and thermoluminescence dosemeter (TLD) measurements were carried out for the linear accelerators of 6 MV photon beams. ESTRO in vivo dosimetry protocols were followed in the determination of midline doses from measurements of entrance and exit doses. Of the fields monitored by diodes, the maximum absolute deviation of measured midline doses from planned target doses was 8%, with the mean value and the standard deviation of -1.0 and 2.7%. If planned target doses were calculated using radiological water equivalent thicknesses rather than patient geometric thicknesses, the maximum absolute deviation dropped to 4%, with the mean and the standard deviation of 0.7 and 1.8%. For in vivo dosimetry monitored by TLDs, the shift in mean dose remained small but the statistical precision became poor.
Using a 3D tool to document and determine graft loss: A mini-review and case report.
Benjamin, Nicole C; Wurzer, Paul; Voigt, Charles D; Benjamin, Debra A; Herndon, David N
2016-06-01
In severe burns, accurate determination of burn wound size and areas of debridement and graft loss is challenging. In this case report, we describe the use of 3D wound measurement software (BurnCase 3D, RISC Software GmbH, Hagenberg, Austria) in a 29-year-old patient with burns covering 92% of the total body surface area. BurnCase 3D was used to assess burn and monitor all surgical interventions. The software allowed us to calculate areas of graft loss and graft take throughout the acute hospitalization (until 90% of the wounds were covered with homografts). It also enabled preoperative planning for wound coverage and blood loss. Thus, BurnCase 3D appears to be a useful tool for accurate determination of burn wound areas and preoperative planning. However, whether the benefit of more efficient preoperative planning overcomes the disadvantage of the additional time needed to document the wound using the software needs to be evaluated further. Copyright © 2015 Elsevier Ltd and ISBI. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-13
...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.
40 CFR 60.4355 - How do I establish and document a proper parameter monitoring plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards of Performance for Stationary Combustion Turbines Monitoring § 60.4355 How do I establish and document a proper parameter monitoring plan? (a) The steam or water to fuel ratio or other parameters that...
Identifying sediment sources in the sediment TMDL process
Gellis, Allen C.; Fitzpatrick, Faith A.; Schubauer-Berigan, Joseph P.; Landy, R.B.; Gorman Sanisaca, Lillian E.
2015-01-01
Sediment is an important pollutant contributing to aquatic-habitat degradation in many waterways of the United States. This paper discusses the application of sediment budgets in conjunction with sediment fingerprinting as tools to determine the sources of sediment in impaired waterways. These approaches complement monitoring, assessment, and modeling of sediment erosion, transport, and storage in watersheds. Combining the sediment fingerprinting and sediment budget approaches can help determine specific adaptive management plans and techniques applied to targeting hot spots or areas of high erosion.
Late-successional forests and northern spotted owls: how effective is the Northwest Forest Plan?
Miles Hemstrom; Martin G. Raphael
2000-01-01
This paper describes the late-successional and old-growth forest and the northern spotted owl effectiveness monitoring plans for the Northwest Forest Plan. The effectiveness monitoring plan for late-successional and old-growth forests will track changes in forest spatial distribution, and within-stand structure and composition, and it will predict future trends.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Monitoring Activities for F-Area Tank Farm at the Savannah River Site, Revision 0 AGENCY: Nuclear Regulatory... carrying out its responsibilities for monitoring DOE's waste disposal activities at the F-Area Tank Farm at... the availability of ``U.S. Nuclear Regulatory Commission Plan for Monitoring Disposal Actions Taken by...
Application of remote sensing to state and regional problems. [mississippi
NASA Technical Reports Server (NTRS)
Miller, W. F.; Powers, J. S.; Clark, J. R.; Solomon, J. L.; Williams, S. G. (Principal Investigator)
1981-01-01
The methods and procedures used, accomplishments, current status, and future plans are discussed for each of the following applications of LANDSAT in Mississippi: (1) land use planning in Lowndes County; (2) strip mine inventory and reclamation; (3) white-tailed deer habitat evaluation; (4) remote sensing data analysis support systems; (5) discrimination of unique forest habitats in potential lignite areas; (6) changes in gravel operations; and (7) determining freshwater wetlands for inventory and monitoring. The documentation of all existing software and the integration of the image analysis and data base software into a single package are now considered very high priority items.
Ging, P.B.; Judd, L.J.; Wynn, K.H.
1997-01-01
The study area of the South-Central Texas study unit of the National Water-Quality Assessment Program comprises the Edwards aquifer in the San Antonio region and its catchment area. The first phase of the assessment includes evaluation of existing water-quality data for surface water and ground water, including volatile organic compounds, to determine the scope of planned monitoring. Most analyses of volatile organic compounds in surface water are from the National Pollutant Discharge Elimination System sites in San Antonio, Texas. Nine volatile organic compounds were detected at the six sites. The three compounds with the most detections at National Pollutant Discharge Elimination System sites are 1,2,4-trimethylbenzene, toluene, and xylene. Analysis of volatile organic compounds in ground water was limited to Edwards aquifer wells. Twenty-eight volatile organic compounds were detected in samples from 89 wells. The five most commonly detected compounds in samples from wells, in descending order, are tetrachloroethene, trichloroethene, bromoform, chloroform, and dibromochloromethane. Detections of volatile organic compounds in surface water and ground water within the South-Central Texas study area are limited to site-specific sources associated with development; therefore, planned monitoring for possible detections of volatile organic compounds as part of the National Water-Quality Assessment Program will emphasize areas of expanding population and development. Monitoring of volatile organic compounds is planned at National Pollutant Discharge Elimination System sites, at basic fixed surface-water sites, and in the ground-water study-unit surveys.
Ecological effects of contaminants in McCoy Branch, 1989-1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ryon, M.G.
1992-01-01
The 1984 Hazardous and Solid Waste Amendments to the Resource Conservation and Recovery Act (RCRA) required assessment of all current and former solid waste management units. Such a RCRA Facility Investigation (RFI) was required of the Y-12 Plant for their Filled Coal Ash Pond on McCoy Branch. Because the disposal of coal ash in the ash pond, McCoy Branch, and Rogers Quarry was not consistent with the Tennessee Water Quality Act, several remediation steps were implemented or planned for McCoy Branch to address disposal problems. The McCoy Branch RFI plan included provisions for biological monitoring of the McCoy Branch watershed.more » The objectives of the biological monitoring were to: (1) document changes in biological quality of McCoy Branch after completion of a pipeline and after termination of all discharges to Rogers Quarry, (2) provide guidance on the need for additional remediation, and (3) evaluate the effectiveness of implemented remedial actions. The data from the biological monitoring program will also determine if the classified uses, as identified by the State of Tennessee, of McCoy Branch are being protected and maintained. This report discusses results from toxicity monitoring of snails fish community assessment, and a Benthic macroinvertebrate community assessment.« less
Comparative evaluation of ERTS-A imagery for resource inventory in land-use planning
NASA Technical Reports Server (NTRS)
Simonson, G. H. (Principal Investigator)
1972-01-01
There are no author-identified significant results in this report. The overall objectives of this program are: (1) use of multidiscipline team approach to determine features that can be successfully monitored by ERTS-1 imagery for resource inventory, planning, land use zoning, and resource development; and (2) using carefully selected sample areas, develop a comprehensive resource inventory mapping system for use in planning, zoning, and resource development. Progress has included compilation and organization of ground truth data and observations in the primary study area of Crook County; resource inventory legend development; assembly and testing of color enhancement equipment; development and adaption of programs for digital data processing; and quick-look evaluations of initial ERTS-1 imagery for Oregon.
Report on Non-invasive acoustic monitoring of D2O concentration Oct 31 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pantea, Cristian; Sinha, Dipen N.; Lakis, Rollin Evan
There is an urgent need for real-time monitoring of the hydrogen /deuterium ratio (H/D) for heavy water production monitoring. Based upon published literature, sound speed is sensitive to the deuterium content of heavy water and can be measured using existing acoustic methods to determine the deuterium concentration in heavy water solutions. We plan to adapt existing non-invasive acoustic techniques (Swept-Frequency Acoustic Interferometry and Gaussian-pulse acoustic technique) for the purpose of quantifying H/D ratios in solution. A successful demonstration will provide an easily implemented, low cost, and non-invasive method for remote and unattended H/D ratio measurements with a resolution of lessmore » than 0.2% vol.« less
Bat habitat research. Final technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, B.L.; Bosworth, W.R.; Doering, R.W.
This progress report describes activities over the current reporting period to characterize the habitats of bats on the INEL. Research tasks are entitled Monitoring bat habitation of caves on the INEL to determine species present, numbers, and seasons of use; Monitor bat use of man-made ponds at the INEL to determine species present and rates of use of these waters; If the Big Lost River is flowing on the INEL and/or if the Big Lost River sinks contain water, determine species present, numbers and seasons of use; Determine the habitat requirement of Townsend`s big-eared bats, including the microclimate of cavesmore » containing Townsend`s big-eared bats as compared to other caves that do not contain bats; Determine and describe an economical and efficient bat census technique to be used periodically by INEL scientists to determine the status of bats on the INEL; and Provide a suggestive management and protective plan for bat species on the INEL that might, in the future, be added to the endangered and sensitive list;« less
ERIC Educational Resources Information Center
Fernando, Sheara
2010-01-01
The success of an implementation effort depends on the ability for a system to utilize the innovation effectively; the effective usage of an innovation can be determined by monitoring for program integrity and fidelity, and assessing the degree to which the program implementation matches the intended plan (Fixsen, Blase, Horner, & Sugai 2007). The…
40 CFR 98.247 - Records that must be retained.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Tier 4 Calculation Methodology in § 98.37. (b) If you comply with the mass balance methodology in § 98... with § 98.243(c)(4). (2) Start and end times and calculated carbon contents for time periods when off... determining carbon content of feedstock or product. (3) A part of the monitoring plan required under § 98.3(g...
ERIC Educational Resources Information Center
Heneveld, Ward
This report is based on the conviction that improvements in the quality of education must focus on the school as the unit of change. Through a review of the qualitative research literature on school improvement and the more quantitative literature on school effectiveness, a conceptual framework that identifies generic factors that determine school…
Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan
1993-10-01
5 Table 4-2. US EPA Drinking Water MCLs ........................................ 4-6 Table 5-1. Sample Bottle Requirements, Preservation, and Holding... drinking water . " The types of quality control samples that will be collected during the Canal Creek groundwater monitoring program. ]- Jacobs...Revision No.: 0 Date: 10/27/93 Page: 6 of 9 Canal Creek Area, APG-EA, Maryland Groundwater Monitoring Plan, VOLUME I1 Table 4-2. US EPA Drinking Water
Mark H. Huff; Martin G. Raphael; Sherri L. Miller; S. Kim Nelson; Jim Baldwin
2006-01-01
The Northwest Forest Plan (the Plan) is a large-scale ecosystem management plan for federal land in the Pacific Northwest. Marbled murrelet (Brachyramphus marmoratus) populations and habitat were monitored to evaluate effectiveness of the Plan. The chapters in this volume summarize information on marbled murrelet ecology and present the monitoring...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
78 FR 63962 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
...: Scientific research, monitoring or habitat restoration exceptions, state and individual research plans... research, scientific monitoring, and fisheries activities conducted under an approved 4(d) program or plan..., 5 or 20 hours, depending on the research or plan. Burden Hours: 1,760. Needs and Uses: This request...
DOT National Transportation Integrated Search
2011-09-06
Active Transportation in the form of bicycle and pedestrian traffic, is monitored for the Austin-Round Rock-San Marcos, TX region by the Capital Area Metropolitan Planning Organization using a variety of methods: automatic, manual and surveyed. This ...
Test/QA Plan (TQAP) for Verification of Semi-Continuous Ambient Air Monitoring Systems
The purpose of the semi-continuous ambient air monitoring technology (or MARGA) test and quality assurance plan is to specify procedures for a verification test applicable to commercial semi-continuous ambient air monitoring technologies. The purpose of the verification test is ...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.330 Section 91.330 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Consolidated Plan § 91.330 Monitoring. The consolidated plan must describe the standards and procedures that...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.430 Section 91.430 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Plan § 91.430 Monitoring. The consolidated plan must describe the standards and procedures that the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Syh, J; Ding, X; Syh, J
2015-06-15
Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization,more » specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study.« less
36 CFR 219.30 - Plan documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated... years; and a display of the budget trends over at least the past 5 years. (e) Other components. A plan...
This document describes three general approaches to the design of a sampling plan for biological monitoring of coral reefs. Status assessment, trend detection and targeted monitoring each require a different approach to site selection and statistical analysis. For status assessm...
40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...
40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...
77 FR 40860 - Strategic Plan for Federal Research and Monitoring of Ocean Acidification
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... Plan for Federal Research and Monitoring of Ocean Acidification AGENCY: National Marine Fisheries... Federal Research and Monitoring of Ocean Acidification is being made available for public review and... understanding of the process of ocean acidification, its effects on marine ecosystems, and the steps that could...
300 area TEDF NPDES Permit Compliance Monitoring Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loll, C.M.
1995-09-05
This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.
Developing and Monitoring Individual Education Plans for Handicapped Children.
ERIC Educational Resources Information Center
Armstrong, Mary Lee
The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…
Analysis of the characteristics of competitive badminton
Cabello, M; Gonzalez-Badillo, J
2003-01-01
Objective: To describe the characteristics of badminton in order to determine the energy requirements, temporal structure, and movements in the game that indicate performance level. To use the findings to plan training with greater precision. Methods: Eleven badminton players (mean (SD) age 21.8 (3.26) years) with international experience from four different countries (France, Italy, Spain, and Portugal) were studied. Two of the Spanish players were monitored in several matches, giving a total of 14 samples, all during the 1999 Spanish International Tournament. Blood lactate concentration was measured with a reflective photometer. Maximum and average heart rates were recorded with a heart rate monitor. Temporal structure and actions during the matches were determined from video recordings. All variables were measured during and after the game and later analysed using a descriptive study. Results: The results confirmed the high demands of the sport, with a maximum heart rate of 190.5 beats/min and an average of 173.5 beats/min during matches over 28 minutes long and performance intervals of 6.4 seconds and rest time of 12.9 seconds between exchanges. Conclusions: The results suggest that badminton is characterised by repetitive efforts of alactic nature and great intensity which are continuously performed throughout the match. An awareness of these characteristics, together with data on the correlations between certain actions such as unforced errors and winning shots and the final result of the match, will aid in more appropriate planning and monitoring of specific training. PMID:12547746
Hydrologic data and description of a hydrologic monitoring plan for the Borax Lake area, Oregon
Schneider, Tiffany Rae; McFarland, William D.
1995-01-01
Information from field visits was used to develop a monitoring plan. The plan would include monitoring Borax Lake by measuring discharge, stage, evaporation, temperature, and specific conductance; water-quality sampling and analysis; and monitoring shallow ground-water levels near Borax Lake using shallow piezometers. Minimally, one hot spring in North Borax Lake Spring Group 1 would be monitored for temperature and specific conductance and sampled for water-quality analysis. In addition, two flowing wells would be monitored for water levels, temperature, specific conductance, and discharge and sampled for water-quality analysis. The construction characteristics of these wells must be verified before long-term data collection begins. In the future, it may be helpful to monitor shallow and (or) deep observation wells drilled into the thermal aquifer to understand the possible effects of geothermal development on Borax Lake and nearby springs.
Late-successional and old-growth forest effectiveness monitoring plan for the Northwest Forest Plan.
Miles Hemstrom; Thomas Spies; Craig Palmer; Ross Kiester; John Teply; Phil McDonald; Ralph. Warbington
1998-01-01
This report presents options for long-term effectiveness monitoring of late-successional and old-growth forests under the Northwest Forest Plan. It describes methods to answer questions about how much late-successional forest exists on Federal land, its pattern, how itâs changing, and if the Forest Plan is providing for its conservation and management. It specifies...
Urban land-use study plan for the National Water-Quality Assessment Program
Squillace, P.J.; Price, C.V.
1996-01-01
This study plan is for Urban Land-Use Studies initiated as part of the U.S. Geological Survey's National Water-Quality Assessment (NAWQA) Program. There are two Urban Land-Use Study objectives: (1) Define the water quality in recharge areas of shallow aquifers underlying areas of new residential and commercial land use in large metropolitan areas, and (2) determine which natural and human factors most strongly affect the occurrence of contaminants in these shallow aquifers. To meet objective 1, each NAWQA Study Unit will install and collect water samples from at least 30 randomly located monitoring wells in a metropolitan area. To meet objective 2, aquifer characteristics and land-use information will be documented. This includes particle-size analysis of each major lithologic unit both in the unsaturated zone and in the aquifer near the water table. The percentage of organic carbon also will be determined for each lithologic unit. Geographic information system coverages will be created that document existing land use around the wells. These data will aid NAWQA personnel in relating natural and human factors to the occurrence of contaminants. Water samples for age dating also will be collected from all monitoring wells, but the samples will be stored until the occurrence of contaminants has been determined. Age-date analysis will be done only on those samples that have no detectable concentrations of anthropogenic contaminants.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, B; Lee, S; Chen, S
Purpose: Monitoring the delivered dose is an important task for the adaptive radiotherapy (ART) and for determining time to re-plan. A software tool which enables automatic delivered dose calculation using cone-beam CT (CBCT) has been developed and tested. Methods: The tool consists of four components: a CBCT Colleting Module (CCM), a Plan Registration Moduel (PRM), a Dose Calculation Module (DCM), and an Evaluation and Action Module (EAM). The CCM is triggered periodically (e.g. every 1:00 AM) to search for newly acquired CBCTs of patients of interest and then export the DICOM files of the images and related registrations defined inmore » ARIA followed by triggering the PRM. The PRM imports the DICOM images and registrations, links the CBCTs to the related treatment plan of the patient in the planning system (RayStation V4.5, RaySearch, Stockholm, Sweden). A pre-determined CT-to-density table is automatically generated for dose calculation. Current version of the DCM uses a rigid registration which regards the treatment isocenter of the CBCT to be the isocenter of the treatment plan. Then it starts the dose calculation automatically. The AEM evaluates the plan using pre-determined plan evaluation parameters: PTV dose-volume metrics and critical organ doses. The tool has been tested for 10 patients. Results: Automatic plans are generated and saved in the order of the treatment dates of the Adaptive Planning module of the RayStation planning system, without any manual intervention. Once the CTV dose deviates more than 3%, both email and page alerts are sent to the physician and the physicist of the patient so that one can look the case closely. Conclusion: The tool is capable to perform automatic dose tracking and to alert clinicians when an action is needed. It is clinically useful for off-line adaptive therapy to catch any gross error. Practical way of determining alarming level for OAR is under development.« less
A Fast Goal Recognition Technique Based on Interaction Estimates
NASA Technical Reports Server (NTRS)
E-Martin, Yolanda; R-Moreno, Maria D.; Smith, David E.
2015-01-01
Goal Recognition is the task of inferring an actor's goals given some or all of the actor's observed actions. There is considerable interest in Goal Recognition for use in intelligent personal assistants, smart environments, intelligent tutoring systems, and monitoring user's needs. In much of this work, the actor's observed actions are compared against a generated library of plans. Recent work by Ramirez and Geffner makes use of AI planning to determine how closely a sequence of observed actions matches plans for each possible goal. For each goal, this is done by comparing the cost of a plan for that goal with the cost of a plan for that goal that includes the observed actions. This approach yields useful rankings, but is impractical for real-time goal recognition in large domains because of the computational expense of constructing plans for each possible goal. In this paper, we introduce an approach that propagates cost and interaction information in a plan graph, and uses this information to estimate goal probabilities. We show that this approach is much faster, but still yields high quality results.
On the role of model-based monitoring for adaptive planning under uncertainty
NASA Astrophysics Data System (ADS)
Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn
2016-04-01
Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory, triggered by the challenge of uncertainty in operational control, may offer solutions from which monitoring for adaptive planning can benefit. Specifically: (i) in control, observations are incorporated into the model through data assimilation, updating the present state, boundary conditions, and parameters based on new observations, diminishing the shadow of the past; (ii) adaptive control is a way to modify the characteristics of the internal model, incorporating new knowledge on the system, countervailing the inhibition of learning; and (iii) in closed-loop control, a continuous system update equips the controller with "inherent robustness", i.e. to capacity to adapts to new conditions even when these were not initially considered. We aim to explore how inherent robustness addresses the challenge of surprise. Innovations in model-based control might help to improve and adapt the models used to support adaptive delta management to new information (reducing uncertainty). Moreover, this would offer a starting point for using these models not only in the design of adaptive plans, but also as part of the monitoring. The proposed research requires multidisciplinary cooperation between control theory, the policy sciences, and integrated assessment modeling.
Eldridge, Sara L. Caldwell; Wherry, Susan A.; Wood, Tamara M.
2014-01-01
Upper Klamath Lake in south-central Oregon has become increasingly eutrophic over the past century and now experiences seasonal cyanobacteria-dominated and potentially toxic phytoplankton blooms. Growth and decline of these blooms create poor water-quality conditions that can be detrimental to fish, including two resident endangered sucker species. Upper Klamath Lake is the primary water supply to agricultural areas within the upper Klamath Basin. Water from the lake is also used to generate power and to enhance and sustain downstream flows in the Klamath River. Water quality in Upper Klamath Lake has been monitored by the Klamath Tribes since the early 1990s and by the U.S. Geological Survey (USGS) since 2002. Management agencies and other stakeholders have determined that a re-evaluation of the goals for water-quality monitoring is warranted to assess whether current data-collection activities will continue to adequately provide data for researchers to address questions of interest and to facilitate future natural resource management decisions. The purpose of this study was to (1) compile an updated list of the goals and objectives for long-term water-quality monitoring in Upper Klamath Lake with input from upper Klamath Basin stakeholders, (2) assess the current water-quality monitoring programs in Upper Klamath Lake to determine whether existing data-collection strategies can fulfill the updated goals and objectives for monitoring, and (3) identify potential modifications to future monitoring plans in accordance with the updated monitoring objectives and improve stakeholder cooperation and data-collection efficiency. Data collected by the Klamath Tribes and the USGS were evaluated to determine whether consistent long-term trends in water-quality variables can be described by the dataset and whether the number and distribution of currently monitored sites captures the full range of environmental conditions and the multi-scale variability of water-quality parameters in the lake. Also, current monitoring strategies were scrutinized for unnecessary redundancy within the overall network.
Environmental impact studies for gas hydrate production test in the Ulleung Basin, East Sea of Korea
NASA Astrophysics Data System (ADS)
Ryu, Byong-Jae
2017-04-01
To develop potential future energy resources, the Korean National Gas Hydrate Program has been carried out since 2005. The program has been supported by the Ministry of Trade, Industry and Energy (MOTIE), and carried out by the Korea Institute of Geoscience and Mineral Resources (KIGAM), the Korea Gas Corporation (KOGAS) and the Korea National Oil Corporation (KNOC) under the management of Gas Hydrate R&D Organization (GHDO). As a part of this national program, geophysical surveys, geological studies on gas hydrates and two deep drilling expeditions were performed. Gas hydrate-bearing sand layers suitable for production using current technologies were found during the Second Ulleung Basin Gas Hydrate Drilling Expedition (UBGH2) in 2010. Environmental impact studies (EIS) also have been carried out since 2012 by KIGAM in cooperation with domestic and foreign universities and research organizations to ensure safe production test that will be performed in near future. The schedule of production test is being planned. The EIS includes assessment of environmental risks, examination on domestic environmental laws related with production test, collection of basic oceanographic information, and baseline and monitoring surveys. Oceanographic information and domestic environmental laws are already collected and analyzed. Baseline survey has been performed using the in-house developed system, KIGAM Seafloor Observation System (KISOS) since 2013. It will also be performed. R/V TAMHAE II of KIGAM used for KISOS operation. As a part of this EIS, pseudo-3D Chirp survey also was carried out in 2014 to determine the development of fault near the potential testing site. Using KIGAM Seafloor Monitoring System (KIMOS), monitoring survey is planned to be performed from three month before production test to three months after production test. The geophysical survey for determining the change of gas hydrate reservoirs and production-efficiency around the production well would also be conducted before and after the production test. KIMOS will be developed as the planning that was drawn up already. A period for monitoring survey and geophysical survey type, such as AUV or EM surveys will be decided according to the budget.
San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition
NASA Technical Reports Server (NTRS)
Werth, L. F. (Principal Investigator)
1981-01-01
The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.
When goals collide: monitoring the goals of multiple characters.
Magliano, Joseph P; Taylor, Holly A; Kim, Hyun-Jeong Joyce
2005-12-01
Most story plots contain multiple characters who are independent, interact, and often have conflicting goals. One would expect that narrative understanding would require monitoring of the goals, concerns, and situations of multiple agents. There is considerable evidence that understanders monitor the primary protagonist's goal plans (e.g., Suh & Trabasso, 1993). However, there is relatively little research on the extent to which understanders monitor the goals of multiple agents. We investigated the impact of characters' roles and prominence on the extent to which understanders monitor the goal plans of multiple characters in a feature length film. In Experiment 1, participants made situation change judgments, and in Experiment 2, they verbally described scenes. Both types of judgments indicated that viewers monitor the goals and plans of multiple agents but do so to a greater extent for characters more prominent to the plotline.
Mastery Motivational Climate: Influence on Physical Play and Heart Rate in African American Toddlers
ERIC Educational Resources Information Center
Parish, Loraine E.; Rudisill, Mary E.; St. Onge, Paul M.
2007-01-01
The purpose of this study was to determine the effectiveness of a planned mastery motivational physical play session on physical activity (i.e., heart rate [HR] and physical play intensity [PAHR greater than 50]) in toddlers (N = 21), as compared to a nonplanned free play session. Participants wore a monitor to measure HR over two, 30 min play…
Advanced Environmental Monitoring and Control Program: Strategic Plan
NASA Technical Reports Server (NTRS)
Schmidt, Gregory
1996-01-01
Human missions in space, from short-duration shuttle missions lasting no more than several days to the medium-to-long-duration missions planned for the International Space Station, face a number of hazards that must be understood and mitigated for the mission to be carried out safely. Among these hazards are those posed by the internal environment of the spacecraft itself; through outgassing of toxic vapors from plastics and other items, failures or off-nominal operations of spacecraft environmental control systems, accidental exposure to hazardous compounds used in experiments: all present potential hazards that while small, may accumulate and pose a danger to crew health. The first step toward mitigating the dangers of these hazards is understanding the internal environment of the spacecraft and the compounds contained within it. Future spacecraft will have integrated networks of redundant sensors which will not only inform the crew of hazards, but will pinpoint the problem location and, through analysis by intelligent systems, recommend and even implement a course of action to stop the problem. This strategic plan details strategies to determine NASA's requirements for environmental monitoring and control systems for future spacecraft, and goals and objectives for a program to answer these needs.
Plan execution monitoring with distributed intelligent agents for battle command
NASA Astrophysics Data System (ADS)
Allen, James P.; Barry, Kevin P.; McCormick, John M.; Paul, Ross A.
2004-07-01
As military tactics evolve toward execution centric operations the ability to analyze vast amounts of mission relevant data is essential to command and control decision making. To maintain operational tempo and achieve information superiority we have developed Vigilant Advisor, a mobile agent-based distributed Plan Execution Monitoring system. It provides military commanders with continuous contingency monitoring tailored to their preferences while overcoming the network bandwidth problem often associated with traditional remote data querying. This paper presents an overview of Plan Execution Monitoring as well as a detailed view of the Vigilant Advisor system including key features and statistical analysis of resource savings provided by its mobile agent-based approach.
Paula-Moraes, S; Burkness, E C; Hunt, T E; Wright, R J; Hein, G L; Hutchison, W D
2011-12-01
Striacosta albicosta (Smith) (Lepidoptera: Noctuidae), is a native pest of dry beans (Phaseolus vulgaris L.) and corn (Zea mays L.). As a result of larval feeding damage on corn ears, S. albicosta has a narrow treatment window; thus, early detection of the pest in the field is essential, and egg mass sampling has become a popular monitoring tool. Three action thresholds for field and sweet corn currently are used by crop consultants, including 4% of plants infested with egg masses on sweet corn in the silking-tasseling stage, 8% of plants infested with egg masses on field corn with approximately 95% tasseled, and 20% of plants infested with egg masses on field corn during mid-milk-stage corn. The current monitoring recommendation is to sample 20 plants at each of five locations per field (100 plants total). In an effort to develop a more cost-effective sampling plan for S. albicosta egg masses, several alternative binomial sampling plans were developed using Wald's sequential probability ratio test, and validated using Resampling for Validation of Sampling Plans (RVSP) software. The benefit-cost ratio also was calculated and used to determine the final selection of sampling plans. Based on final sampling plans selected for each action threshold, the average sample number required to reach a treat or no-treat decision ranged from 38 to 41 plants per field. This represents a significant savings in sampling cost over the current recommendation of 100 plants.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... groundfish sector to request exemptions from Federal fishing regulations through its annual operations plan... rule implementing the annual sector operations plans. However, sectors can request exemptions at any...-funded at-sea monitoring program will be required to develop a monitoring plan as part of its operation...
Establishing a regional monitoring strategy: The Pacific Northwest Forest Plan
Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett
1999-01-01
This paper identifies lessons learned and issues raised during the development of an ecosystem monitoring strategy intended to support the Northwest Forest Plan. Adaptive ecosystem management, which requires monitoring as essential feedback to management, recognizes that action is necessary or appropriate, although knowledge may be imperfect. We suggest that this...
Monitoring in the nearshore: A process for making reasoned decisions
Bodkin, James L.; Dean, T.A.
2003-01-01
Over the past several years, a conceptual framework for the GEM nearshore monitoring program has been developed through a series of workshops. However, details of the proposed monitoring program, e.g. what to sample, where to sample, when to sample and at how many sites, have yet to be determined. In FY 03 we were funded under Project 03687 to outline a process whereby specific alternatives to monitoring are developed and presented to the EVOS Trustee Council for consideration. As part of this process, two key elements are required before reasoned decisions can be made. These are: 1) a comprehensive historical perspective of locations and types of past studies conducted in the nearshore marine communities within Gulf of Alaska, and 2) estimates of costs for each element of a proposed monitoring program. We have developed a GIS database that details available information from past studies of selected nearshore habitats and species in the Gulf of Alaska and provide a visual means of selecting sites based (in part) on the locations for which historical data of interest are available. We also provide cost estimates for specific monitoring plan alternatives and outline several alternative plans that can be accomplished within reasonable budgetary constraints. The products that we will provide are: 1) A GIS database and maps showing the location and types of information available from the nearshore in the Gulf of Alaska; 2) A list of several specific monitoring alternatives that can be conducted within reasonable budgetary constraints; and 3) Cost estimates for proposed tasks to be conducted as part of the nearshore program. Because data compilation and management will not be completed until late in FY03 we are requesting support for close-out of this project in FY 04.
Weiner, Scott G; Griggs, Christopher A; Mitchell, Patricia M; Langlois, Breanne K; Friedman, Franklin D; Moore, Rebecca L; Lin, Shuo Cheng; Nelson, Kerrie P; Feldman, James A
2013-10-01
We compare emergency provider impression of drug-seeking behavior with objective criteria from a state prescription drug monitoring program, assess change in opioid pain reliever prescribing after prescription drug monitoring program review, and examine clinical factors associated with suspected drug-seeking behavior. This was a prospective observational study of emergency providers assessing a convenience sample of patients aged 18 to 64 years who presented to either of 2 academic medical centers with chief complaint of back pain, dental pain, or headache. Drug-seeking behavior was objectively defined as present when a patient had greater than or equal to 4 opioid prescriptions by greater than or equal to 4 providers in the 12 months before emergency department evaluation. Emergency providers completed data forms recording their impression of the likelihood of drug-seeking behavior, patient characteristics, and plan for prescribing pre- and post-prescription drug monitoring program review. Descriptive statistics were generated. We calculated agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program definition, and sensitivity, specificity, and positive predictive value of emergency provider impression, using prescription drug monitoring program criteria as the criterion standard. A multivariate logistic regression analysis was conducted to determine clinical factors associated with drug-seeking behavior. Thirty-eight emergency providers with prescription drug monitoring program access participated. There were 544 patient visits entered into the study from June 2011 to January 2013. There was fair agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program (κ=0.30). Emergency providers had sensitivity 63.2% (95% confidence interval [CI] 54.8% to 71.7%), specificity 72.7% (95% CI 68.4% to 77.0%), and positive predictive value 41.2% (95% CI 34.4% to 48.2%) for identifying drug-seeking behavior. After exposure to prescription drug monitoring program data, emergency providers changed plans to prescribe opioids at discharge in 9.5% of cases (95% CI 7.3% to 12.2%), with 6.5% of patients (n=35) receiving opioids not previously planned and 3.0% (n=16) no longer receiving opioids. Predictors for drug-seeking behavior by prescription drug monitoring program criteria were patient requests opioid medications by name (odds ratio [OR] 1.91; 95% CI 1.13 to 3.23), multiple visits for same complaint (OR 2.5; 95% CI 1.49 to 4.18), suspicious history (OR 1.88; 95% CI 1.1 to 3.19), symptoms out of proportion to examination (OR 1.83; 95% CI 1.1 to 3.03), and hospital site (OR 3.1; 95% CI 1.76 to 5.44). Emergency providers had fair agreement with objective criteria from the prescription drug monitoring program in suspecting drug-seeking behavior. Program review changed management plans in a small number of cases. Multiple clinical factors were predictive of drug-seeking behavior. Copyright © 2013 American College of Emergency Physicians. Published by Mosby, Inc. All rights reserved.
Using Bayesian networks to support decision-focused information retrieval
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehner, P.; Elsaesser, C.; Seligman, L.
This paper has described an approach to controlling the process of pulling data/information from distributed data bases in a way that is specific to a persons specific decision making context. Our prototype implementation of this approach uses a knowledge-based planner to generate a plan, an automatically constructed Bayesian network to evaluate the plan, specialized processing of the network to derive key information items that would substantially impact the evaluation of the plan (e.g., determine that replanning is needed), automated construction of Standing Requests for Information (SRIs) which are automated functions that monitor changes and trends in distributed data base thatmore » are relevant to the key information items. This emphasis of this paper is on how Bayesian networks are used.« less
NASA Astrophysics Data System (ADS)
Burnison, S. A.; Ditty, P.; Gorecki, C. D.; Hamling, J. A.; Steadman, E. N.; Harju, J. A.
2013-12-01
The Plains CO2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center, is working with Denbury Onshore LLC to determine the effect of a large-scale injection of carbon dioxide (CO2) into a deep clastic reservoir for the purpose of simultaneous CO2 enhanced oil recovery (EOR) and to study incidental CO2 storage at the Bell Creek oil field located in southeastern Montana. This project will reduce CO2 emissions by more than 1 million tons a year while simultaneously recovering an anticipated 30 million barrels of incremental oil. The Bell Creek project provides a unique opportunity to use and evaluate a comprehensive suite of technologies for monitoring, verification, and accounting (MVA) of CO2 on a large-scale. The plan incorporates multiple geophysical technologies in the presence of complementary and sometimes overlapping data to create a comprehensive data set that will facilitate evaluation and comparison. The MVA plan has been divided into shallow and deep subsurface monitoring. The deep subsurface monitoring plan includes 4-D surface seismic, time-lapse 3-D vertical seismic profile (VSP) surveys incorporating a permanent borehole array, and baseline and subsequent carbon-oxygen logging and other well-based measurements. The goal is to track the movement of CO2 in the reservoir, evaluate the recovery/storage efficiency of the CO2 EOR program, identify fluid migration pathways, and determine the ultimate fate of injected CO2. CO2 injection at Bell Creek began in late May 2013. Prior to injection, a monitoring and characterization well near the field center was drilled and outfitted with a distributed temperature-monitoring system and three down-hole pressure gauges to provide continuous real-time data of the reservoir and overlying strata. The monitoring well allows on-demand access for time-lapse well-based measurements and borehole seismic instrumentation. A 50-level permanent borehole array of 3-component geophones was installed in a second monitoring well. A pre-injection series of carbon-oxygen logging across the reservoir was acquired in 35 wells. The baseline 3-D surface seismic survey was acquired in September 2012. A 3-D VSP incorporating two wells and 2 square miles of overlapping seismic coverage in the middle of the field was acquired in May 2013. Initial iterations of geologic modeling and reservoir simulation of the field have been completed. Currently, passive seismic monitoring with the permanent borehole array is being conducted during injection. Interpretation results from the baseline surface 3-D survey and preliminary results from the baseline 3-D VSP are being evaluated and integrated into the reservoir model. The PCOR Partnership's philosophy is to combine site characterization, modeling, and monitoring strategies into an iterative process to produce descriptive integrated results. The comprehensive effort at Bell Creek will allow a comparison of the effectiveness of several complementary geophysical and well-based methods in meeting the goals of the deep subsurface monitoring effort.
Mountain pine beetle detection and monitoring: evaluation of airborne imagery
NASA Astrophysics Data System (ADS)
Roberts, A.; Bone, C.; Dragicevic, S.; Ettya, A.; Northrup, J.; Reich, R.
2007-10-01
The processing and evaluation of digital airborne imagery for detection, monitoring and modeling of mountain pine beetle (MPB) infestations is evaluated. The most efficient and reliable remote sensing strategy for identification and mapping of infestation stages ("current" to "red" to "grey" attack) of MPB in lodgepole pine forests is determined for the most practical and cost effective procedures. This research was planned to specifically enhance knowledge by determining the remote sensing imaging systems and analytical procedures that optimize resource management for this critical forest health problem. Within the context of this study, airborne remote sensing of forest environments for forest health determinations (MPB) is most suitably undertaken using multispectral digitally converted imagery (aerial photography) at scales of 1:8000 for early detection of current MPB attack and 1:16000 for mapping and sequential monitoring of red and grey attack. Digital conversion should be undertaken at 10 to 16 microns for B&W multispectral imagery and 16 to 24 microns for colour and colour infrared imagery. From an "operational" perspective, the use of twin mapping-cameras with colour and B&W or colour infrared film will provide the best approximation of multispectral digital imagery with near comparable performance in a competitive private sector context (open bidding).
NASA Astrophysics Data System (ADS)
Rodrigues, Harley F.; Capistrano, Gustavo; Mello, Francyelli M.; Zufelato, Nicholas; Silveira-Lacerda, Elisângela; Bakuzis, Andris F.
2017-05-01
Non-invasive and real-time monitoring of the heat delivery during magnetic nanoparticle hyperthermia (MNH) is of fundamental importance to predict clinical outcomes for cancer treatment. Infrared thermography (IRT) can determine the surface temperature due to three-dimensional heat delivery inside a subcutaneous tumor, an argument that is supported by numerical simulations. However, for precise temperature determination, it is of crucial relevance to use a correct experimental configuration. This work reports an MNH study using a sarcoma 180 murine tumor containing 3.9 mg of intratumorally injected manganese-ferrite nanoparticles. MNH was performed at low field amplitude and non-uniform field configuration. Five 30 min in vivo magnetic hyperthermia experiments were performed, monitoring the surface temperature with a fiber optical sensor and thermal camera at distinct angles with respect to the animal’s surface. The results indicate that temperature errors as large as 7~\\circ C can occur if the experiment is not properly designed. A new IRT error model is found to explain the data. More importantly, we show how to precisely monitor temperature with IRT during hyperthermia, which could positively impact heat dosimetry and clinical planning.
Rodrigues, Harley F; Capistrano, Gustavo; Mello, Francyelli M; Zufelato, Nicholas; Silveira-Lacerda, Elisângela; Bakuzis, Andris F
2017-05-21
Non-invasive and real-time monitoring of the heat delivery during magnetic nanoparticle hyperthermia (MNH) is of fundamental importance to predict clinical outcomes for cancer treatment. Infrared thermography (IRT) can determine the surface temperature due to three-dimensional heat delivery inside a subcutaneous tumor, an argument that is supported by numerical simulations. However, for precise temperature determination, it is of crucial relevance to use a correct experimental configuration. This work reports an MNH study using a sarcoma 180 murine tumor containing 3.9 mg of intratumorally injected manganese-ferrite nanoparticles. MNH was performed at low field amplitude and non-uniform field configuration. Five 30 min in vivo magnetic hyperthermia experiments were performed, monitoring the surface temperature with a fiber optical sensor and thermal camera at distinct angles with respect to the animal's surface. The results indicate that temperature errors as large as [Formula: see text]C can occur if the experiment is not properly designed. A new IRT error model is found to explain the data. More importantly, we show how to precisely monitor temperature with IRT during hyperthermia, which could positively impact heat dosimetry and clinical planning.
Measurement of high altitude air quality using aircraft
NASA Technical Reports Server (NTRS)
Rudey, R. A.; Perkins, P. J.
1973-01-01
The minor atmospheric constituents associated with and affected by aircraft exhaust emissions at altitudes from 6 to 20 km will be monitored in flight programs presently being implemented. Preliminary in situ data are available from flight tests of dedicated instruments to be used in these programs. A Global Atmospheric Sampling Program using Boeing 747 airliners was determined to be feasible in studies conducted by airlines and airframe companies. Worldwide monitoring in the troposphere and the lower stratosphere is planned. Stratospheric air sampling on a more local basis will be done with a U2 aircraft. Measuring system evaluations and improvements have been required to detect the low background levels.
Measurement of high-altitude air quality using aircraft.
NASA Technical Reports Server (NTRS)
Rudey, R. A.; Perkins, P. J.
1973-01-01
The minor atmospheric constituents associated with and affected by aircraft exhaust emissions at altitudes from 6 to 20 km will be monitored in flight programs presently being implemented. Preliminary in situ data are available from flight tests of dedicated instruments to be used in these programs. A Global Atmospheric Sampling Program using Boeing 747 airliners was determined to be feasible in studies conducted by airlines and airframe companies. Worldwide monitoring in the troposphere and the lower stratosphere is planned. Stratospheric air sampling on a more local basis will be done with a U2 aircraft. Measuring system evaluations and improvements have been required to detect the low background levels.
Northwest Forest Plan—the first 10 years (1994–2003): socioeconomic monitoring results.
S. Charnley
2006-01-01
The socioeconomic monitoring report addresses two evaluation questions posed in the Northwest Forest Plan (the Plan) Record of Decision and assesses progress in meeting five Plan socioeconomic goals. Volume I of the report contains key findings. Volume II addresses the question, Are predictable levels of timber and nontimber resources available and being produced? It...
Northern spotted owl effectiveness monitoring plan for the Northwest Forest Plan.
Joseph Lint; Barry Noon; Robert Anthony; Eric Forsman; Martin Raphael; Michael Collopy; Edward. Starkey
1999-01-01
This report describes options for effectiveness monitoring of long-term status and trends of the northern spotted owl to evaluate the success of the Northwest Forest Plan in arresting downward population trends, and in maintaining and restoring the habitat conditions necessary to support viable owl populations on Federal lands. It describes options to address...
Marbled murrelet effectiveness monitoring plan for the Northwest Forest Plan.
Sarah Madsen; Diane Evans; Thomas Hamer; Paul Henson; Sherri Miller; S. Kim Nelson; Daniel Roby; Martin Stapanian
1999-01-01
This report describes options for effectiveness monitoring of long-term status and trends to evaluate the success of the Northwest Forest Plan in maintaining and restoring marbled murrelet nesting habitat and populations on Federal lands. A two-phase approach is described that begins with developing reliable and repeatable processes for identifying nesting habitat and...
40 CFR 63.11468 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2010 CFR
2010-07-01
... baghouse, including but not limited to air leaks, torn or broken bags or filter media, or any other... identified in the site-specific monitoring plan required by paragraph (c)(2) of this section. (vii) You must... submit to the Administrator or delegated authority for approval a site-specific monitoring plan for each...
The strategy and design of the effectiveness monitoring program for the Northwest Forest Plan.
Barry S. Mulder; Barry R. Noon; Thomas A. Spies; Martin G. Raphael; Craig J. Palmer; Anthony R. Olsen; Gordon H. Reeves; Hartwell H. Welsh
1999-01-01
This report describes the logic and design of an effectiveness monitoring program for the Northwest Forest Plan. The program is prospective, providing an early warning of environmental change before irreversible loss has occurred. Monitoring is focused at two resource levels: individual species and specific ecosystem types. Selection of prospective indicators for the...
DOT National Transportation Integrated Search
2003-07-31
This Stormwater BMP Monitoring Plan details the approach to be used for monitoring : roadside ditch sediment traps located on Highway 26 in the Mt. Hood National Forest. : These sediment traps were designed and installed by ODOT for the capture of se...
DOT National Transportation Integrated Search
1987-03-01
Court monitoring is a planned approach to studying the handling of DWI offenders, from arrest through sentencing, either through actually observing court hearings or by reviewing case outcomes in court files. The booklet is designed to help groups in...
Applicability of interferometric SAR technology to ground movement and pipeline monitoring
NASA Astrophysics Data System (ADS)
Grivas, Dimitri A.; Bhagvati, Chakravarthy; Schultz, B. C.; Trigg, Alan; Rizkalla, Moness
1998-03-01
This paper summarizes the findings of a cooperative effort between NOVA Gas Transmission Ltd. (NGTL), the Italian Natural Gas Transmission Company (SNAM), and Arista International, Inc., to determine whether current remote sensing technologies can be utilized to monitor small-scale ground movements over vast geographical areas. This topic is of interest due to the potential for small ground movements to cause strain accumulation in buried pipeline facilities. Ground movements are difficult to monitor continuously, but their cumulative effect over time can have a significant impact on the safety of buried pipelines. Interferometric synthetic aperture radar (InSAR or SARI) is identified as the most promising technique of those considered. InSAR analysis involves combining multiple images from consecutive passes of a radar imaging platform. The resulting composite image can detect changes as small as 2.5 to 5.0 centimeters (based on current analysis methods and radar satellite data of 5 centimeter wavelength). Research currently in progress shows potential for measuring ground movements as small as a few millimeters. Data needed for InSAR analysis is currently commercially available from four satellites, and additional satellites are planned for launch in the near future. A major conclusion of the present study is that InSAR technology is potentially useful for pipeline integrity monitoring. A pilot project is planned to test operational issues.
Improving IMRT delivery efficiency using intensity limits during inverse planning.
Coselmon, Martha M; Moran, Jean M; Radawski, Jeffrey D; Fraass, Benedick A
2005-05-01
Inverse planned intensity modulated radiotherapy (IMRT) fields can be highly modulated due to the large number of degrees of freedom involved in the inverse planning process. Additional modulation typically results in a more optimal plan, although the clinical rewards may be small or offset by additional delivery complexity and/or increased dose from transmission and leakage. Increasing modulation decreases delivery efficiency, and may lead to plans that are more sensitive to geometrical uncertainties. The purpose of this work is to assess the use of maximum intensity limits in inverse IMRT planning as a simple way to increase delivery efficiency without significantly affecting plan quality. Nine clinical cases (three each for brain, prostate, and head/neck) were used to evaluate advantages and disadvantages of limiting maximum intensity to increase delivery efficiency. IMRT plans were generated using in-house protocol-based constraints and objectives for the brain and head/neck, and RTOG 9406 dose volume objectives in the prostate. Each case was optimized at a series of maximum intensity ratios (the product of the maximum intensity and the number of beams divided by the prescribed dose to the target volume), and evaluated in terms of clinical metrics, dose-volume histograms, monitor units (MU) required per fraction (SMLC and DMLC delivery), and intensity map variation (a measure of the beam modulation). In each site tested, it was possible to reduce total monitor units by constraining the maximum allowed intensity without compromising the clinical acceptability of the plan. Monitor unit reductions up to 38% were observed for SMLC delivery, while reductions up to 29% were achieved for DMLC delivery. In general, complicated geometries saw a smaller reduction in monitor units for both delivery types, although DMLC delivery required significantly more monitor units in all cases. Constraining the maximum intensity in an inverse IMRT plan is a simple way to improve delivery efficiency without compromising plan objectives.
Wildlife monitoring program plan
NASA Technical Reports Server (NTRS)
Sebesta, P.; Arno, R.
1979-01-01
A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.
Gallio, Elena; Giglioli, Francesca Romana; Girardi, Andrea; Guarneri, Alessia; Ricardi, Umberto; Ropolo, Roberto; Ragona, Riccardo; Fiandra, Christian
2018-02-01
Automated treatment planning is a new frontier in radiotherapy. The Auto-Planning module of the Pinnacle 3 treatment planning system (TPS) was evaluated for liver stereotactic body radiation therapy treatments. Ten cases were included in the study. Six plans were generated for each case by four medical physics experts. The first two planned with Pinnacle TPS, both with manual module (MP) and Auto-Planning one (AP). The other two physicists generated two plans with Monaco TPS (VM). Treatment plan comparisons were then carried on the various dosimetric parameters of target and organs at risk, monitor units, number of segments, plan complexity metrics and human resource planning time. The user dependency of Auto-Planning was also tested and the plans were evaluated by a trained physician. Statistically significant differences (Anova test) were observed for spinal cord doses, plan average beam irregularity, number of segments, monitor units and human planning time. The Fisher-Hayter test applied to these parameters showed significant statistical differences between AP e MP for spinal cord doses and human planning time; between MP and VM for monitor units, number of segments and plan irregularity; for all those between AP and VM. The two plans created by different planners with AP were similar to each other. The plans created with Auto-Planning were comparable to the manually generated plans. The time saved in planning enables the planner to commit more resources to more complex cases. The independence of the planner enables to standardize plan quality. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-24
This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less
Determining the Value of Future Information
2011-03-01
trouble spots around the world, help plan military operations, and monitor the environment. The NRO’s Operational Support Office ( OSO ) “orchestrates...offices” (Parnell, Bennet, Engelbrecht, Szafranski, 2002:77). Parnell’s team’s research was intended “to help the OSO to identify and develop high- value...tasks that directly support OSO and NRO strategic objectives and to select the best portfolio of tasks to meet resource and programmatic constraints
Department of Defense Strategic Sustainability Performance Plan FY 2012
2012-01-01
electricity consumption by 2020. Over FYs 2012 and 2013, DON will determine which installations have the best opportunity to cost- effectively achieve net...continental United States, to more effectively track fuel consumption and monitor and reduce vehicle idling. With the support of other private and...biofuel is the most effective way to reduce fleet petroleum consumption . In locations where biofuel is not available, the fleet should consider
Susan E. Shideler
2000-01-01
The desire of the public to protect free-ranging animals in environments that are devoid of natural regulators can lead to overabundance of urban wildlife in closed habitats. In some parks and reserves, innovative management plans are needed that will include protocols to determine when and if artificial methods of population control should be applied to free-ranging...
Jones, William R.; Garber, Adrienne
2013-01-01
The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the classification of high-resolution, color-infrared aerial photography at the U.S. Geological Survey’s National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change.
Planning for execution monitoring on a planetary rover
NASA Technical Reports Server (NTRS)
Gat, Erann; Firby, R. James; Miller, David P.
1990-01-01
A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.
Kamaleldin, Maha; Elsherbini, Nader A; Elshemey, Wael M
2017-09-27
The aim of this study is to evaluate the impact of anisotropic analytical algorithm (AAA) and 2 reporting systems (AXB-D m and AXB-D w ) of Acuros XB algorithm (AXB) on clinical plans of nasopharyngeal patients using intensity-modulated radiotherapy (IMRT) and RapidArc (RA) techniques. Six plans of different algorithm-technique combinations are performed for 10 patients to calculate dose-volume histogram (DVH) physical parameters for planning target volumes (PTVs) and organs at risk (OARs). The number of monitor units (MUs) and calculation time are also determined. Good coverage is reported for all algorithm-technique combination plans without exceeding the tolerance for OARs. Regardless of the algorithm, RA plans persistently reported higher D 2% values for PTV-70. All IMRT plans reported higher number of MUs (especially with AXB) than did RA plans. AAA-IMRT produced the minimum calculation time of all plans. Major differences between the investigated algorithm-technique combinations are reported only for the number of MUs and calculation time parameters. In terms of these 2 parameters, it is recommended to employ AXB in calculating RA plans and AAA in calculating IMRT plans to achieve minimum calculation times at reduced number of MUs. Copyright © 2017 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
Improving plan quality for prostate volumetric-modulated arc therapy.
Wright, Katrina; Ferrari-Anderson, Janet; Barry, Tamara; Bernard, Anne; Brown, Elizabeth; Lehman, Margot; Pryor, David
2017-01-01
We critically evaluated the quality and consistency of volumetric-modulated arc therapy (VMAT) prostate planning at a single institution to quantify objective measures for plan quality and establish clear guidelines for plan evaluation and quality assurance. A retrospective analysis was conducted on 34 plans generated on the Pinnacle 3 version 9.4 and 9.8 treatment planning system to deliver 78 Gy in 39 fractions to the prostate only using VMAT. Data were collected on contoured structure volumes, overlaps and expansions, planning target volume (PTV) and organs at risk volumes and relationship, dose volume histogram, plan conformity, plan homogeneity, low-dose wash, and beam parameters. Standard descriptive statistics were used to describe the data. Despite a standardized planning protocol, we found variability was present in all steps of the planning process. Deviations from protocol contours by radiation oncologists and radiation therapists occurred in 12% and 50% of cases, respectively, and the number of optimization parameters ranged from 12 to 27 (median 17). This contributed to conflicts within the optimization process reflected by the mean composite objective value of 0.07 (range 0.01 to 0.44). Methods used to control low-intermediate dose wash were inconsistent. At the PTV rectum interface, the dose-gradient distance from the 74.1 Gy to 40 Gy isodose ranged from 0.6 cm to 2.0 cm (median 1.0 cm). Increasing collimator angle was associated with a decrease in monitor units and a single full 6 MV arc was sufficient for the majority of plans. A significant relationship was found between clinical target volume-rectum distance and rectal tolerances achieved. A linear relationship was determined between the PTV volume and volume of 40 Gy isodose. Objective values and composite objective values were useful in determining plan quality. Anatomic geometry and overlap of structures has a measurable impact on the plan quality achieved for prostate patients being treated with VMAT. By evaluating multiple planning variables, we have been able to determine important factors influencing plan quality and develop predictive models for quality metrics that have been incorporated into our new protocol and will be tested and refined in future studies. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.
A representation for error detection and recovery in robot task plans
NASA Technical Reports Server (NTRS)
Lyons, D. M.; Vijaykumar, R.; Venkataraman, S. T.
1990-01-01
A general definition is given of the problem of error detection and recovery in robot assembly systems, and a general representation is developed for dealing with the problem. This invariant representation involves a monitoring process which is concurrent, with one monitor per task plan. A plan hierarchy is discussed, showing how diagnosis and recovery can be handled using the representation.
A Great Lakes atmospheric mercury monitoring network: evaluation and design
Risch, Martin R.; Kenski, Donna M.; ,; David, A.
2014-01-01
As many as 51 mercury (Hg) wet-deposition-monitoring sites from 4 networks were operated in 8 USA states and Ontario, Canada in the North American Great Lakes Region from 1996 to 2010. By 2013, 20 of those sites were no longer in operation and approximately half the geographic area of the Region was represented by a single Hg-monitoring site. In response, a Great Lakes Atmospheric Mercury Monitoring (GLAMM) network is needed as a framework for regional collaboration in Hg-deposition monitoring. The purpose of the GLAMM network is to detect changes in regional atmospheric Hg deposition related to changes in Hg emissions. An optimized design for the network was determined to be a minimum of 21 sites in a representative and approximately uniform geographic distribution. A majority of the active and historic Hg-monitoring sites in the Great Lakes Region are part of the National Atmospheric Deposition Program (NADP) Mercury Deposition Network (MDN) in North America and the GLAMM network is planned to be part of the MDN. To determine an optimized network design, active and historic Hg-monitoring sites in the Great Lakes Region were evaluated with a rating system of 21 factors that included characteristics of the monitoring locations and interpretations of Hg data. Monitoring sites were rated according to the number of Hg emissions sources and annual Hg emissions in a geographic polygon centered on each site. Hg-monitoring data from the sites were analyzed for long-term averages in weekly Hg concentrations in precipitation and weekly Hg-wet deposition, and on significant temporal trends in Hg concentrations and Hg deposition. A cluster analysis method was used to group sites with similar variability in their Hg data in order to identify sites that were unique for explaining Hg data variability in the Region. The network design included locations in protected natural areas, urban areas, Great Lakes watersheds, and in proximity to areas with a high density of annual Hg emissions and areas with high average weekly Hg wet deposition. In a statistical analysis, relatively strong, positive correlations in the wet deposition of Hg and sulfate were shown for co-located NADP Hg-monitoring and acid-rain monitoring sites in the Region. This finding indicated that efficiency in regional Hg monitoring can be improved by adding new Hg monitoring to existing NADP acid-rain monitoring sites. Implementation of the GLAMM network design will require Hg-wet-deposition monitoring to be: (a) continued at 12 MDN sites active in 2013 and (b) restarted or added at 9 NADP sites where it is absent in 2013. Ongoing discussions between the states in the Great Lakes Region, the Lake Michigan Air Directors Consortium (a regional planning entity), the NADP, the U.S. Environmental Protection Agency, and the U.S. Geological Survey are needed for coordinating the GLAMM network.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoverson, Eric D.; Amonette, Alexandra
The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less
Virtual Mission Operations of Remote Sensors With Rapid Access To and From Space
NASA Technical Reports Server (NTRS)
Ivancic, William D.; Stewart, Dave; Walke, Jon; Dikeman, Larry; Sage, Steven; Miller, Eric; Northam, James; Jackson, Chris; Taylor, John; Lynch, Scott;
2010-01-01
This paper describes network-centric operations, where a virtual mission operations center autonomously receives sensor triggers, and schedules space and ground assets using Internet-based technologies and service-oriented architectures. For proof-of-concept purposes, sensor triggers are received from the United States Geological Survey (USGS) to determine targets for space-based sensors. The Surrey Satellite Technology Limited (SSTL) Disaster Monitoring Constellation satellite, the United Kingdom Disaster Monitoring Constellation (UK-DMC), is used as the space-based sensor. The UK-DMC s availability is determined via machine-to-machine communications using SSTL s mission planning system. Access to/from the UK-DMC for tasking and sensor data is via SSTL s and Universal Space Network s (USN) ground assets. The availability and scheduling of USN s assets can also be performed autonomously via machine-to-machine communications. All communication, both on the ground and between ground and space, uses open Internet standards.
Jafari, Shakardokht M; Jordan, Tom J; Distefano, Gail; Bradley, David A; Spyrou, Nicholas M; Nisbet, Andrew; Clark, Catharine H
2015-01-01
To investigate the feasibility of using glass beads as novel thermoluminescent dosemeters (TLDs) for radiotherapy treatment plan verification. Commercially available glass beads with a size of 1-mm thickness and 2-mm diameter were characterized as TLDs. Five clinical treatment plans including a conventional larynx, a conformal prostate, an intensity-modulated radiotherapy (IMRT) prostate and two stereotactic body radiation therapy (SBRT) lung plans were transferred onto a CT scan of a water-equivalent phantom (Solid Water(®), Gammex, Middleton, WI) and the dose distribution recalculated. The number of monitor units was maintained from the clinical plan and delivered accordingly. The doses determined by the glass beads were compared with those measured by a graphite-walled ionization chamber, and the respective expected doses were determined by the treatment-planning system (TPS) calculation. The mean percentage difference between measured dose with the glass beads and TPS was found to be 0.3%, -0.1%, 0.4%, 1.8% and 1.7% for the conventional larynx, conformal prostate, IMRT prostate and each of the SBRT delivery techniques, respectively. The percentage difference between measured dose with the ionization chamber and glass bead was found to be -1.2%, -1.4%, -0.1%, -0.9% and 2.4% for the above-mentioned plans, respectively. The results of measured doses with the glass beads and ionization chamber in comparison with expected doses from the TPS were analysed using a two-sided paired t-test, and there was no significant difference at p < 0.05. It is feasible to use glass-bead TLDs as dosemeters in a range of clinical plan verifications. Commercial glass beads are utilized as low-cost novel TLDs for treatment-plan verification.
Lake Roosevelt Fisheries Monitoring Program; 1988-1989 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peone, Tim L.; Scholz, Allan T.; Griffith, James R.
1990-10-01
In the Northwest Power Planning Council's 1987 Columbia River Basin Fish and Wildlife Program (NPPC 1987), the Council directed the Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries as partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam [Section 903 (g)(l)(C)]. The hatcheries will produce kokanee salmon for outplanting into Lake Roosevelt as well as rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen program. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. Themore » monitoring program included the following components: (1) a year-round, reservoir-wide, creel survey to determine angler use, catch rates and composition, and growth and condition of fish; (2) assessment of kokanee, rainbow, and walleye (Stizostedion vitreum) feeding habits and densities of their preferred prey, and; (3) a mark and recapture study designed to assess the effectiveness of different locations where hatchery-raised kokanee and net pen reared rainbow trout are released. The above measures were adopted by the Council based on a management plan, developed by the Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and National Park Service, that examined the feasibility of restoring and enhancing Lake Roosevelt fisheries (Scholz et al. 1986). In July 1988, BPA entered into a contract with the Spokane Indian Tribe to initiate the monitoring program. The projected duration of the monitoring program is through 1995. This report contains the results of the monitoring program from August 1988 to December 1989.« less
Symstad, Amy J.; Wienk, Cody L.; Thorstenson, Andy
2006-01-01
The Northern Great Plains Inventory & Monitoring (I&M) Network (Network) of the National Park Service (NPS) consists of 13 NPS units in North Dakota, South Dakota, Nebraska, and eastern Wyoming. The Network is in the planning phase of a long-term program to monitor the health of park ecosystems. Plant community composition is one of the 'Vital Signs,' or indicators, that will be monitored as part of this program for three main reasons. First, plant community composition is information-rich; a single sampling protocol can provide information on the diversity of native and non-native species, the abundance of individual dominant species, and the abundance of groups of plants. Second, plant community composition is of specific management concern. The abundance and diversity of exotic plants, both absolute and relative to native species, is one of the greatest management concerns in almost all Network parks (Symstad 2004). Finally, plant community composition reflects the effects of a variety of current or anticipated stressors on ecosystem health in the Network parks including invasive exotic plants, large ungulate grazing, lack of fire in a fire-adapted system, chemical exotic plant control, nitrogen deposition, increased atmospheric carbon dioxide concentrations, and climate change. Before the Network begins its Vital Signs monitoring, a detailed plan describing specific protocols used for each of the Vital Signs must go through rigorous development and review. The pilot study on which we report here is one of the components of this protocol development. The goal of the work we report on here was to determine a specific method to use for monitoring plant community composition of the herb layer (< 2 m tall).
1991-07-05
This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.
A Review of Player Monitoring Approaches in Basketball: Current Trends and Future Directions.
Fox, Jordan L; Scanlan, Aaron T; Stanton, Robert
2017-07-01
Fox, JL, Scanlan, AT, and Stanton, R. A review of player monitoring approaches in basketball: current trends and future directions. J Strength Cond Res 31(7): 2021-2029, 2017-Effective monitoring of players in team sports such as basketball requires an understanding of the external demands and internal responses, as they relate to training phases and competition. Monitoring of external demands and internal responses allows coaching staff to determine the dose-response associated with the imposed training load (TL), and subsequently, if players are adequately prepared for competition. This review discusses measures reported in the literature for monitoring the external demands and internal responses of basketball players during training and competition. The external demands of training and competition were primarily monitored using time-motion analysis, with limited use of microtechnology being reported. Internal responses during training were typically measured using hematological markers, heart rate, various TL models, and perceptual responses such as rating of perceived exertion (RPE). Heart rate was the most commonly reported indicator of internal responses during competition with limited reporting of hematological markers or RPE. These findings show a large discrepancy between the reporting of external and internal measures and training and competition demands. Microsensors, however, may be a practical and convenient method of player monitoring in basketball to overcome the limitations associated with current approaches while allowing for external demands and internal responses to be recorded simultaneously. The triaxial accelerometers of microsensors seem well suited for basketball and warrant validation to definitively determine their place in the monitoring of basketball players. Coaching staff should make use of this technology by tracking individual player responses across the annual plan and using real-time monitoring to minimize factors such as fatigue and injury risk.
NASA Technical Reports Server (NTRS)
1975-01-01
The application of remote sensing techniques to land management, urban planning, agriculture, oceanography, and environmental monitoring is discussed. The results of various projects are presented along with cost effective considerations.
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
Anticipating market demand: tracking enrollee satisfaction and health over time.
Allen, H
1998-12-01
To assess guidelines, set by the National Committee for Quality Assurance, for the Health Plan Employer Data and Information Set (HEDIS) 1999 CAHPS 2.0H Survey (formerly the HEDIS 1999 Consumer Survey) in the light of user's needs to monitor health plan performance over time, monitor sick enrollees, and prioritize determinants (drivers) of enrollee experience. A two-wave, cross-sectional/longitudinal panel design, consisting of national surveys mailed to employees of three major USA corporations in 1993 and 1995. Samples included employees selected to represent 23 major managed care and indemnity plans in five regions of the USA. In 1993, 14 587 employees responded and in 1995 9018 employees responded (response rates: 51 and 52%). The longitudinal panel sample included 5729 employees who completed both surveys and stayed in the same plan for both years. STUDY MEASURES: The main 1993 and 1995 surveys consisted of 154 and 116 items, respectively. Panel survey content assessed care delivery, plan administration, functional status, well being, and chronic disease. CAHPS 2.0H's point-in-time, cross-sectional design was unable to detect selection bias and led to an inaccurate view of change in performance. CAHPS 2.0H's use of aggregate samples masked key differences between healthy and sick enrollees; e.g. the sick became less satisfied over time. The association-based, statistical techniques that many survey users will employ to prioritize the 'drivers' of enrollee experience in the absence of CAHPS 2.0H guidelines yielded a less efficient account of change than the multi-method/multi-trait approach developed for this project. Consumer experience of plan performance is best understood when the separate contributions of longitudinal membership and movement in and out of plans are clarified, changes in health are identified, changes for sick and healthy enrollees are compared, and plan performance on satisfaction criteria is probed to give confirmation and detail. Changes to the CAHPS 2.0H approach in HEDIS 1999 will facilitate user application of these principles.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linard, Joshua; Price, Jeffrey
2015-08-01
Groundwater samples were collected during the 2015 sampling event from point-of-compliance (POC) wells 0171, 0173, 0176, 0179, 0181, and 0813 to monitor the disposition of contaminants in the middle sandstone unit of the Cedar Mountain Formation. Groundwater samples also were collected from alluvium monitoring wells 0188, 0189, 0192, 0194, and 0707, and basal sandstone monitoring wells 0182, 0184, 0185, and 0588 as a best management practice. Surface locations 0846 and 0847 were sampled to monitor for degradation of water quality in the backwater area of Brown’s Wash and in the Green River immediately downstream of Brown’s Wash. The Green Rivermore » location 0801 is upstream from the site and is sampled to determine background-threshold values (BTVs). Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). Water levels were measured at each sampled well. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. All six POC wells are completed in the middle sandstone unit of the Cedar Mountain Formation and are monitored to measure contaminant concentrations for comparison to proposed alternate concentration limits (ACLs), as provided in Table 1. Contaminant concentrations in the POC wells remain below their respective ACLs.« less
Sesli, Faik Ahmet; Karsli, Fevzi; Colkesen, Ismail; Akyol, Nihat
2009-06-01
Coastline mapping and coastline change detection are critical issues for safe navigation, coastal resource management, coastal environmental protection, and sustainable coastal development and planning. Changes in the shape of coastline may fundamentally affect the environment of the coastal zone. This may be caused by natural processes and/or human activities. Over the past 30 years, the coastal sites in Turkey have been under an intensive restraint associated with a population press due to the internal and external touristic demand. In addition, urbanization on the filled up areas, settlements, and the highways constructed to overcome the traffic problems and the other applications in the coastal region clearly confirm an intensive restraint. Aerial photos with medium spatial resolution and high resolution satellite imagery are ideal data sources for mapping coastal land use and monitoring their changes for a large area. This study introduces an efficient method to monitor coastline and coastal land use changes using time series aerial photos (1973 and 2002) and satellite imagery (2005) covering the same geographical area. Results show the effectiveness of the use of digital photogrammetry and remote sensing data on monitoring large area of coastal land use status. This study also showed that over 161 ha areas were filled up in the research area and along the coastal land 12.2 ha of coastal erosion is determined for the period of 1973 to 2005. Consequently, monitoring of coastal land use is thus necessary for coastal area planning in order to protecting the coastal areas from climate changes and other coastal processes.
Development of the monitoring system to detect the piping thickness reduction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, N. Y.; Ryu, K. H.; Oh, Y. J.
2006-07-01
As nuclear piping becomes aging, secondary piping which was considered safe, undergo thickness reduction problem these days. After some accidents caused by Flow Accelerated Corrosion (FAC), guidelines and recommendations for the thinned pipe management were issued, and thus need for monitoring increases. Through thinned pipe management program, monitoring activities based on the various analyses and the case study of other plants also increases. As the monitoring points increase, time needs to cover the recommended inspection area becomes increasing, while the time given to inspect the piping during overhaul becomes shortened. Existing Ultrasonic Technique (UT) can cover small area in amore » given time. Moreover, it cannot be applied to a complex geometry piping or a certain location like welded part. In this paper, we suggested Switching Direct Current Potential Drop (S-DCPD) method by which we can narrow down the FAC-susceptible area. To apply DCPD, we developed both resistance model and Finite Element Method (FEM) model to predict the DCPD feasibility. We tested elbow specimen to compare DCPD monitoring results with UT results to identify consistency. For the validation test, we designed simulation loop. To determine the text condition, we analyzed environmental parameters and introduced applicable wearing rate model. To obtain the model parameters, we developed electrodes and analyzed velocity profile in the test loop using CFX code. Based on the prediction model and prototype testing results, we are planning to perform validation test to identify applicability of S-DCPD in the NPP environment. Validation text plan will be described as a future work. (authors)« less
Cornhusker Army Ammunition Plant Longterm Groundwater Monitoring Health and Safety Plan
1997-06-01
Enclosed please find fifteen copies of the final Health and Safety Plan for the long term ground water monitoring at the Cornhusker Army Ammunitions...Plant. Enclosed within the plan is a letter dated June 6, 1997 containing responses to the comments received from William Houser. The responses to Mr. Houser’s comments have also been incorporated into the document as appropriate.
Northwest Forest Plan—the first 10 years (1994-2003): synthesis of monitoring and research results.
Richard W. Haynes; Bernard T. Bormann; Danny C. Lee; Jon R. Martin
2006-01-01
It has been 10 years since the Northwest Forest Plan (the Plan) came into being at the direction of President Clinton. This report synthesizes the status and trends of five major elements of the Plan: older forests, species, aquatic systems, socioeconomics, and adaptive management and monitoring. It synthesizes new science that has resulted from a decade of research....
Sean P. Gallagher; David W. Wright
2012-01-01
California's coastal salmon and steelhead populations are listed under California and Federal Endangered Species Acts; both require monitoring to provide measures of recovery. Since 2004 the California Department of Fish and Game and NOAA Fisheries have been developing a monitoring plan for California¡¯s coastal salmonids (the California Coastal Salmonid...
Assessment of SRS ambient air monitoring network
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abbott, K.; Jannik, T.
Three methodologies have been used to assess the effectiveness of the existing ambient air monitoring system in place at the Savannah River Site in Aiken, SC. Effectiveness was measured using two metrics that have been utilized in previous quantification of air-monitoring network performance; frequency of detection (a measurement of how frequently a minimum number of samplers within the network detect an event), and network intensity (a measurement of how consistent each sampler within the network is at detecting events). In addition to determining the effectiveness of the current system, the objective of performing this assessment was to determine what, ifmore » any, changes could make the system more effective. Methodologies included 1) the Waite method of determining sampler distribution, 2) the CAP88- PC annual dose model, and 3) a puff/plume transport model used to predict air concentrations at sampler locations. Data collected from air samplers at SRS in 2015 compared with predicted data resulting from the methodologies determined that the frequency of detection for the current system is 79.2% with sampler efficiencies ranging from 5% to 45%, and a mean network intensity of 21.5%. One of the air monitoring stations had an efficiency of less than 10%, and detected releases during just one sampling period of the entire year, adding little to the overall network intensity. By moving or removing this sampler, the mean network intensity increased to about 23%. Further work in increasing the network intensity and simulating accident scenarios to further test the ambient air system at SRS is planned« less
1980-11-01
the rapid, partial removal or covering of contamination to reduce the radiation exposure rate as quickly as practicable to a point where priority work ...should be responsible for planning and implementing all decontamination activities. He could be a city en- gineer, public works engineer, industrial safety...responsibility for a local civil defense or emergency preparedness program. DisaterAnalysis - A review and determination of the extent of damage sufere bya
Kirby, Mark F; Law, Robin J
2010-06-01
A fully integrated and effective response to an oil or chemical spill at sea must include a well planned and executed post-incident assessment of environmental contamination and damage. While salvage, rescue and clean-up operations are generally well considered, including reviews and exercises, the expertise, resources, networks and logistical planning required to achieve prompt and effective post-spill impact assessment and monitoring are not generally well established. The arrangement and co-ordination of post-incident monitoring and impact assessment need to consider sampling design, biological effects, chemical analysis and collection/interpretation of expert local knowledge. This paper discusses the risks, impacts and mitigation options associated with accidental spills and considers the importance of pre-considered impact assessment and monitoring programmes in the wider response cycle. The PREMIAM (Pollution Response in Emergencies: Marine Impact Assessment and Monitoring; www.premiam.org) project is considered as an example of an improved approach to the planning, co-ordination and conduct of post-incident monitoring.
Application of constraint-based satellite mission planning model in forest fire monitoring
NASA Astrophysics Data System (ADS)
Guo, Bingjun; Wang, Hongfei; Wu, Peng
2017-10-01
In this paper, a constraint-based satellite mission planning model is established based on the thought of constraint satisfaction. It includes target, request, observation, satellite, payload and other elements, with constraints linked up. The optimization goal of the model is to make full use of time and resources, and improve the efficiency of target observation. Greedy algorithm is used in the model solving to make observation plan and data transmission plan. Two simulation experiments are designed and carried out, which are routine monitoring of global forest fire and emergency monitoring of forest fires in Australia. The simulation results proved that the model and algorithm perform well. And the model is of good emergency response capability. Efficient and reasonable plan can be worked out to meet users' needs under complex cases of multiple payloads, multiple targets and variable priorities with this model.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun
Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system wasmore » designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.« less
Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q
2015-01-01
An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system's ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.
15 CFR 990.55 - Restoration selection-developing restoration plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... involvement of the responsible parties in the assessment; and (vii) A description of monitoring for.... (3) The monitoring component to the Draft Restoration Plan should address such factors as duration...
USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
A tentative discussion on the monitoring of water resources in China
NASA Astrophysics Data System (ADS)
Yang, Jianqing; Dai, Ning; Wu, Mengying; Wang, Guangsheng
2016-10-01
With the rapid economy development and social civilization progress, the Chinese Government also is improving ecological environmental conditions. More efforts have been made to solve water problems through the implementation of stringent water resources management, as a key government policy on water. Thus, monitoring of water resources has been strengthened, being a main component of the hydrological work in recent years. Compared with routine hydrological monitoring, water resources monitoring pays more attention to the quantity and quality variations of regional waters, to reflect the status of water in river basins and administrative regions. In this paper, the overall layout of the hydrometric network in China is presented, monitoring efforts of the natural water cycle and water consumptions are analyzed, methodologies of water resources monitoring, which are commonly applied in the country, are summed up. Taking the hydrometric network planning on interprovincial boundary waterbodies as example, a summary of the planning at interprovincial boundary river sections is presented. The planning can meet the need of water resources management of administrative divisions. It can also improve the overall water resources monitoring for the country.
Hydraulic-fracture diagnostic research. Final report, December 1989-December 1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, J.E.; Adair, R.G.; Clawson, G.E.
1992-05-01
The results of the research in microseismic methods to determine hydraulic fracture dimensions during the contract were significant. The GRI Hydraulic Fracture Test Site (HFTS) development planning was a major effort. Ten meetings of the Planning Team were coordinated and hosted. A statement of the HFTS mission, scope, objectives, and requirements was created. The primary objectives were to provide for interdisciplinary experiments on fracture modeling and fracture diagnostics. A Conceptual Plan for the HFTS was compiled by Teledyne Geotech and distributed at the Project Advisors Group meeting. An experiment at the Shell South Belridge Field in California was a directmore » analog of the HFTS. Multiple fracture stimulations were monitored from 3 wells with cemented-in geophones. Methods of handling and processing large data volumes in real time were established. The final fracture geometry did not fit the circular model. Fracture diagnostics were monitored at two GRI cooperative wells: the Enron S. Hogsback No. 13-8A and the Phillips Ward C No. 11. Theoretical studies indicate that crack waves might be used as an estimate of fracture length. After applying advanced signal enhancement techniques to low-frequency signals from 14 surveys, it was concluded that the data from presently available sondes is contaminated by sonde resonances.« less
NASA Astrophysics Data System (ADS)
Cahyono, P.; Astuti, N. K.; Purwito; Rahmat, A.
2018-03-01
One of the problems caused by climate change is unpredictable of the dry season. Understanding when the dry season will start is very important to planning the irrigation schedule especially on large plantation. Data of rainfall for 30 years in Lampung, especially in Pineapple Plantation show that dry month occurs from June to October. If in two decadals (ten days period) rainfall less than 100 mm then it is predicted that next decadal will be dry season. Great Giant Pineapple Co. Ltd. has 32,000 hectares plantation area and located in three regencies at Lampung Province, Indonesia with varies rainfall between regions within a plantation. Therefore, monitoring the rainfall distribution by using ombrometer installed at 10 representative location points can be used to determine irrigation period at the beginning of dry season. Mapping method using the server program and data source is from 10 monitoring rainfall stations installed at the observed points. Preparation of rainfall distribution mapping is important to know the beginning of the dry season and thus planning the irrigation. The results show that 2nd decadal of April is indicated as the starting time of dry season, which is similar with Indonesian government for climate agency’s result.
Horn, W; Miksch, S; Egghart, G; Popow, C; Paky, F
1997-09-01
Real-time systems for monitoring and therapy planning, which receive their data from on-line monitoring equipment and computer-based patient records, require reliable data. Data validation has to utilize and combine a set of fast methods to detect, eliminate, and repair faulty data, which may lead to life-threatening conclusions. The strength of data validation results from the combination of numerical and knowledge-based methods applied to both continuously-assessed high-frequency data and discontinuously-assessed data. Dealing with high-frequency data, examining single measurements is not sufficient. It is essential to take into account the behavior of parameters over time. We present time-point-, time-interval-, and trend-based methods for validation and repair. These are complemented by time-independent methods for determining an overall reliability of measurements. The data validation benefits from the temporal data-abstraction process, which provides automatically derived qualitative values and patterns. The temporal abstraction is oriented on a context-sensitive and expectation-guided principle. Additional knowledge derived from domain experts forms an essential part for all of these methods. The methods are applied in the field of artificial ventilation of newborn infants. Examples from the real-time monitoring and therapy-planning system VIE-VENT illustrate the usefulness and effectiveness of the methods.
Environmental assessment of the Carlsbad Environmental Monitoring and Research Center Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
This Environmental Assessment has been prepared to determine if the Carlsbad Environmental Monitoring and Research Center (the Center), or its alternatives would have significant environmental impacts that must be analyzed in an Environmental Impact Statement. DOE`s proposed action is to continue funding the Center. While DOE is not funding construction of the planned Center facility, operation of that facility is dependent upon continued funding. To implement the proposed action, the Center would initially construct a facility of approximately 2,300 square meters (25,000 square feet). The Phase 1 laboratory facilities and parking lot will occupy approximately 1.2 hectares (3 acres) ofmore » approximately 8.9 hectares (22 acres) of land which were donated to New Mexico State University (NMSU) for this purpose. The facility would contain laboratories to analyze chemical and radioactive materials typical of potential contaminants that could occur in the environment in the vicinity of the DOE Waste Isolation Pilot Plant (WIPP) site or other locations. The facility also would have bioassay facilities to measure radionuclide levels in the general population and in employees of the WIPP. Operation of the Center would meet the DOE requirement for independent monitoring and assessment of environmental impacts associated with the planned disposal of transuranic waste at the WIPP.« less
Yilmaz, Ozge; Can, Zehra S; Toroz, Ismail; Dogan, Ozgur; Oncel, Salim; Alp, Emre; Dilek, Filiz B; Karanfil, Tanju; Yetis, Ulku
2014-08-01
Hazardous waste (HW) generation information is an absolute necessity for ensuring the proper planning, implementation, and monitoring of any waste management system. Unfortunately, environmental agencies in developing countries face difficulties in gathering data directly from the creators of such wastes. It is possible, however, to construct theoretical HW inventories using the waste generation factors (WGFs). The objective of this study was to develop a complete nationwide HW inventory of Turkey that relies on nation-specific WGFs to support management activities of the Turkish Ministry of Environment and Urbanization (MoEU). Inventory studies relied on WGFs from: (a) the literature and (b) field studies and analysis of waste declarations reflecting country-specific industrial practices. Moreover, new tools were introduced to the monitoring infrastructure of MoEU to obtain a comprehensive waste generation data set. Through field studies and a consideration of country specific conditions, it was possible to more thoroughly elucidate HW generation trends in Turkey, a method that was deemed superior to other alternatives. Declaration and literature based WGFs also proved most helpful in supplementing field observations that could not always be conducted. It was determined that these theoretical inventories could become valuable assets in supporting regulating agencies in developing countries for a more thorough implementation of HW management systems. © The Author(s) 2014.
Environmental monitoring handbook for coal conversion facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salk, M.S.; DeCicco, S.G.
1978-05-01
The primary objectives of the Department of Energy's (DOE) coal conversion program are to demonstrate the environmental acceptability, technical feasibility, and economic viability of various technologies for gaseous, liquid, and solid fuels from coal. The Environmental Monitoring Handbook for Coal Conversion Facilities will help accomplish the objective of environmental acceptability by guiding the planning and execution of socioeconomic and environmental monitoring programs for demonstration facilities. These programs will provide information adequate to (1) predict, insofar as is possible, the potential impacts of construction and operation of a coal conversion plant, (2) verify the occurrence of these or any other impactsmore » during construction and operation, (3) determine the adequacy of mitigating measures to protect the environment, (4) develop effluent source terms for process discharges, and (5) determine the effectiveness of pollution control equipment. Although useful in a variety of areas, the handbook is intended primarily for contractors who, as industrial partners with DOE, are building coal conversion plants. For the contractor it is a practical guide on (1) the methodology for developing site- and process-specific environmental monitoring programs, (2) state-of-the-art sampling and analytical techniques, and (3) impact analyses.To correspond to the phases of project activity, the subject matter is divided into four stages of monitoring: (1) a reconnaissance or synoptic survey, (2) preconstruction or baseline, (3) construction, and (4) operation, including process monitoring (prepared by Radian Corp., McLean, Va.). For each stage of monitoring, guidelines are given on socioeconomics, aquatic and terrestrial ecology, air quality and meteorology, surface and groundwater quality, geohydrology and soil survey, and surface water hydrology.« less
Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading
NASA Astrophysics Data System (ADS)
Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.
2012-12-01
Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.
Image-Based 3d Reconstruction and Analysis for Orthodontia
NASA Astrophysics Data System (ADS)
Knyaz, V. A.
2012-08-01
Among the main tasks of orthodontia are analysis of teeth arches and treatment planning for providing correct position for every tooth. The treatment plan is based on measurement of teeth parameters and designing perfect teeth arch curve which teeth are to create after treatment. The most common technique for teeth moving uses standard brackets which put on teeth and a wire of given shape which is clamped by these brackets for producing necessary forces to every tooth for moving it in given direction. The disadvantages of standard bracket technique are low accuracy of tooth dimensions measurements and problems with applying standard approach for wide variety of complex orthodontic cases. The image-based technique for orthodontic planning, treatment and documenting aimed at overcoming these disadvantages is proposed. The proposed approach provides performing accurate measurements of teeth parameters needed for adequate planning, designing correct teeth position and monitoring treatment process. The developed technique applies photogrammetric means for teeth arch 3D model generation, brackets position determination and teeth shifting analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoverson, Eric D.; Amonette, Alexandra
2008-12-02
The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less
Building Software Agents for Planning, Monitoring, and Optimizing Travel
2004-01-01
defined as plans in the Theseus Agent Execution language (Barish et al. 2002). In the Web environment, sources can be quite slow and the latencies of...executor is based on a dataflow paradigm, actions are executed as soon as the data becomes available. Second, Theseus performs the actions in a...while Thesues provides an expressive language for defining information gathering and monitoring plans. The Theseus language supports capabilities
TDRSS momentum unload planning
NASA Technical Reports Server (NTRS)
Cross, George R.; Potter, Mitchell A.; Whitehead, J. Douglass; Smith, James T.
1991-01-01
A knowledge-based system is described which monitors TDRSS telemetry for problems in the momentum unload procedure. The system displays TDRSS telemetry and commands in real time via X-windows. The system constructs a momentum unload plan which agrees with the preferences of the attitude control specialists and the momentum growth characteristics of the individual spacecraft. During the execution of the plan, the system monitors the progress of the procedure and watches for unexpected problems.
Wireless remote monitoring of toxic gases in shipbuilding.
Pérez-Garrido, Carlos; González-Castaño, Francisco J; Chaves-Díeguez, David; Rodríguez-Hernández, Pedro S
2014-02-14
Large-scale wireless sensor networks have not achieved market impact, so far. Nevertheless, this technology may be applied successfully to small-scale niche markets. Shipyards are hazardous working environments with many potential risks to worker safety. Toxic gases generated in soldering processes in enclosed spaces (e.g., cargo holds) are one such risk. The dynamic environment of a ship under construction makes it very difficult to plan gas detection fixed infrastructures connected to external monitoring stations via wired links. While portable devices with gas level indicators exist, they require workers to monitor measurements, often in situations where they are focused on other tasks for relatively long periods. In this work, we present a wireless multihop remote gas monitoring system for shipyard environments that has been tested in a real ship under construction. Using this system, we validate IEEE 802.15.4/Zigbee wireless networks as a suitable technology to connect gas detectors to control stations outside the ships. These networks have the added benefit that they reconfigure themselves dynamically in case of network failure or redeployment, for example when a relay is moved to a new location. Performance measurements include round trip time (which determines the alert response time for safety teams) and link quality indicator and packet error rate (which determine communication robustness).
Wireless Remote Monitoring of Toxic Gases in Shipbuilding
Pérez-Garrido, Carlos; González-Castaño, Francisco J.; Chaves-Diéguez, David; Rodríguez-Hernández, Pedro S.
2014-01-01
Large-scale wireless sensor networks have not achieved market impact, so far. Nevertheless, this technology may be applied successfully to small-scale niche markets. Shipyards are hazardous working environments with many potential risks to worker safety. Toxic gases generated in soldering processes in enclosed spaces (e.g., cargo holds) are one such risk. The dynamic environment of a ship under construction makes it very difficult to plan gas detection fixed infrastructures connected to external monitoring stations via wired links. While portable devices with gas level indicators exist, they require workers to monitor measurements, often in situations where they are focused on other tasks for relatively long periods. In this work, we present a wireless multihop remote gas monitoring system for shipyard environments that has been tested in a real ship under construction. Using this system, we validate IEEE 802.15.4/Zigbee wireless networks as a suitable technology to connect gas detectors to control stations outside the ships. These networks have the added benefit that they reconfigure themselves dynamically in case of network failure or redeployment, for example when a relay is moved to a new location. Performance measurements include round trip time (which determines the alert response time for safety teams) and link quality indicator and packet error rate (which determine communication robustness). PMID:24534919
NASA Astrophysics Data System (ADS)
Kurui, P. K.; Mutua, F.
2016-12-01
The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.
An active monitoring method for flood events
NASA Astrophysics Data System (ADS)
Chen, Zeqiang; Chen, Nengcheng; Du, Wenying; Gong, Jianya
2018-07-01
Timely and active detecting and monitoring of a flood event are critical for a quick response, effective decision-making and disaster reduction. To achieve the purpose, this paper proposes an active service framework for flood monitoring based on Sensor Web services and an active model for the concrete implementation of the active service framework. The framework consists of two core components-active warning and active planning. The active warning component is based on a publish-subscribe mechanism implemented by the Sensor Event Service. The active planning component employs the Sensor Planning Service to control the execution of the schemes and models and plans the model input data. The active model, called SMDSA, defines the quantitative calculation method for five elements, scheme, model, data, sensor, and auxiliary information, as well as their associations. Experimental monitoring of the Liangzi Lake flood in the summer of 2010 is conducted to test the proposed framework and model. The results show that 1) the proposed active service framework is efficient for timely and automated flood monitoring. 2) The active model, SMDSA, is a quantitative calculation method used to monitor floods from manual intervention to automatic computation. 3) As much preliminary work as possible should be done to take full advantage of the active service framework and the active model.
Monitoring black-tailed prairie dog colonies with high-resolution satellite imagery
Sidle, John G.; Johnson, D.H.; Euliss, B.R.; Tooze, M.
2002-01-01
The United States Fish and Wildlife Service has determined that the black-tailed prairie dog (Cynomys ludovicianus) warrants listing as a threatened species under the Endangered Species Act. Central to any conservation planning for the black-tailed prairie dog is an appropriate detection and monitoring technique. Because coarse-resolution satellite imagery is not adequate to detect black-tailed prairie dog colonies, we examined the usefulness of recently available high-resolution (1-m) satellite imagery. In 6 purchased scenes of national grasslands, we were easily able to visually detect small and large colonies without using image-processing algorithms. The Ikonos (Space Imaging(tm)) satellite imagery was as adequate as large-scale aerial photography to delineate colonies. Based on the high quality of imagery, we discuss a possible monitoring program for black-tailed prairie dog colonies throughout the Great Plains, using the species' distribution in North Dakota as an example. Monitoring plots could be established and imagery acquired periodically to track the expansion and contraction of colonies.
Franklin, A; Acar, J; Anthony, F; Gupta, R; Nicholls, T; Tamura, Y; Thompson, S; Threlfall, E J; Vose, D; van Vuuren, M; White, D G; Wegener, H C; Costarrica, M L
2001-12-01
A guideline on the harmonisation of national antimicrobial resistance monitoring and surveillance programmes in animals and animal-derived foods has been developed by the Ad hoc Group of experts on antimicrobial resistance of the Office International des Epizooties. The objective of the guideline is to allow the generation of comparable data from various national surveillance and monitoring systems in order to compare the situations in different regions or countries and to consolidate results at the national, regional and international level. Definitions of surveillance and monitoring are provided. National systems should be able to detect the emergence of resistance, and to determine the prevalence of resistant bacteria. The resulting data should be used in the assessment of risks to public health and should contribute to the establishment of a risk management policy. Specific factors identified for harmonisation include the animal species, food commodities, sampling plans, bacterial species, antimicrobials to be tested, laboratory methods, data reporting, database structure and the structure of reports.
Environmental surveillance master sampling schedule
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bisping, L.E.
This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of themore » onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.« less
Volunteer water monitoring: A guide for state managers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-08-01
Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...
PLANNING STUDY TO MODEL AND MONITOR COAL PILE RUNOFF. PHASE I
The report describes a planning study for predicting and monitoring the hydrologic and chemical characteristics of effluent streams resulting from precipitation impacting on open storage of coal. It includes: a survey of utilities on storage habits and treatment systems for coal ...
75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...
NASA Astrophysics Data System (ADS)
Xu, Sheng; Agarwal, Harsh; Bernardo, Marcelino; Seifabadi, Reza; Turkbey, Baris; Partanen, Ari; Negussie, Ayele; Glossop, Neil; Choyke, Peter; Pinto, Peter; Wood, Bradford J.
2016-03-01
Prostate cancer is often over treated with standard treatment options which impact the patients' quality of life. Laser ablation has emerged as a new approach to treat prostate cancer while sparing the healthy tissue around the tumor. Since laser ablation has a small treatment zone with high temperature, it is necessary to use accurate image guidance and treatment planning to enable full ablation of the tumor. Intraoperative temperature monitoring is also desirable to protect critical structures from being damaged in laser ablation. In response to these problems, we developed a navigation platform and integrated it with a clinical MRI scanner and a side firing laser ablation device. The system allows imaging, image guidance, treatment planning and temperature monitoring to be carried out on the same platform. Temperature sensing phantoms were developed to demonstrate the concept of iterative treatment planning and intraoperative temperature monitoring. Retrospective patient studies were also conducted to show the clinical feasibility of the system.
Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less
SHARD - a SeisComP3 module for Structural Health Monitoring
NASA Astrophysics Data System (ADS)
Weber, B.; Becker, J.; Ellguth, E.; Henneberger, R.; Herrnkind, S.; Roessler, D.
2016-12-01
Monitoring building and structure response to strong earthquake ground shaking or human-induced vibrations in real-time forms the backbone of modern structural health monitoring (SHM). The continuous data transmission, processing and analysis reduces drastically the time decision makers need to plan for appropriate response to possible damages of high-priority buildings and structures. SHARD is a web browser based module using the SeisComp3 framework to monitor the structural health of buildings and other structures by calculating standard engineering seismology parameters and checking their exceedance in real-time. Thresholds can be defined, e.g. compliant with national building codes (IBC2000, DIN4149 or EC8), for PGA/PGV/PGD, response spectra and drift ratios. In case thresholds are exceeded automatic or operator driven reports are generated and send to the decision makers. SHARD also determines waveform quality in terms of data delay and variance to report sensor status. SHARD is the perfect tool for civil protection to monitor simultaneously multiple city-wide critical infrastructure as hospitals, schools, governmental buildings and structures as bridges, dams and power substations.
Li, Fang-Ye; Chen, Xiao-Lei; Xu, Bai-Nan
2016-09-01
To determine the beneficial effects of intraoperative high-field magnetic resonance imaging (MRI), multimodal neuronavigation, and intraoperative electrophysiological monitoring-guided surgery for treating supratentorial cavernomas. Twelve patients with 13 supratentorial cavernomas were prospectively enrolled and operated while using a 1.5 T intraoperative MRI, multimodal neuronavigation, and intraoperative electrophysiological monitoring. All cavernomas were deeply located in subcortical areas or involved critical areas. Intraoperative high-field MRIs were obtained for the intraoperative "visualization" of surrounding eloquent structures, "brain shift" corrections, and navigational plan updates. All cavernomas were successfully resected with guidance from intraoperative MRI, multimodal neuronavigation, and intraoperative electrophysiological monitoring. In 5 cases with supratentorial cavernomas, intraoperative "brain shift" severely deterred locating of the lesions; however, intraoperative MRI facilitated precise locating of these lesions. During long-term (>3 months) follow-up, some or all presenting signs and symptoms improved or resolved in 4 cases, but were unchanged in 7 patients. Intraoperative high-field MRI, multimodal neuronavigation, and intraoperative electrophysiological monitoring are helpful in surgeries for the treatment of small deeply seated subcortical cavernomas.
Dry Particulate Nitrate Deposition in China.
Liu, Lei; Zhang, Xiuying; Zhang, Yan; Xu, Wen; Liu, Xuejun; Zhang, Xiaomin; Feng, Junlan; Chen, Xinrui; Zhang, Yuehan; Lu, Xuehe; Wang, Shanqian; Zhang, Wuting; Zhao, Limin
2017-05-16
A limited number of ground measurements of dry particulate nitrate deposition (NO 3 - ) makes it difficult and challenging to fully know the status of the spatial and temporal variations of dry NO 3 - depositions over China. This study tries to expand the ground measurements of NO 3 - concentrations at monitoring sites to a national scale, based on the Ozone Monitoring Instrument (OMI) NO 2 columns, NO 2 profiles from an atmospheric chemistry transport model (Model for Ozone and Related chemical Tracers, version 4, MOZART-4) and monitor-based sources, and then estimates the NO 3 - depositions on a regional scale based on an inferred model. The ground NO 2 concentrations were first derived from NO 2 columns and the NO 2 profiles, and then the ground NO 3 - concentrations were derived from the ground NO 2 concentrations and the relationship between NO 2 and NO 3 - based on Chinese Nationwide Nitrogen Deposition Monitoring Network (NNDMN). This estimated dry NO 3 - depositions over China will be helpful in determining the magnitude and pollution status in regions without ground measurements, supporting the construction plan of environmental monitoring in future.
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.; Swingle, R.; Crapse, K.
2011-01-01
The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, Gregory
2014-03-01
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less
Laboratory Safety Monitoring of Chronic Medications in Ambulatory Care Settings
Hurley, Judith S; Roberts, Melissa; Solberg, Leif I; Gunter, Margaret J; Nelson, Winnie W; Young, Linda; Frost, Floyd J
2005-01-01
OBJECTIVE To evaluate laboratory safety monitoring in patients taking selected chronic prescription drugs. DESIGN Retrospective study using 1999–2001 claims data to calculate rates of missed laboratory tests (potential laboratory monitoring errors). Eleven drugs/drug groups and 64 laboratory tests were evaluated. SETTING Two staff/network model health maintenance organizations. PATIENTS Continuously enrolled health plan members age≥19 years taking ≥1 chronic medications. MEASUREMENTS AND MAIN RESULTS Among patients taking chronic medications (N=29,823 in 1999, N=32,423 in 2000, and N=36,811 in 2001), 47.1% in 1999, 45.0% in 2000, and 44.0% in 2001 did not receive ≥1 test recommended for safety monitoring. Taking into account that patients were sometimes missing more than 1 test for a given drug and that patients were frequently taking multiple drugs, the rate of all potential laboratory monitoring errors was 849/1,000 patients/year in 1999, 810/1,000 patients/year in 2000, and 797/1,000 patients/year in 2001. Rates of potential laboratory monitoring errors varied considerably across individual drugs and laboratory tests. CONCLUSIONS Lapses in laboratory monitoring of patients taking selected chronic medications were common. Further research is needed to determine whether, and to what extent, this failure to monitor patients is associated with adverse clinical outcomes. PMID:15857489
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ridge, A. Christianne; Barr, Cynthia S.; Pinkston, Karen E.
Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms,more » and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)« less
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
40 CFR 413.03 - Monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... standard for total toxic organics (TTO), I certify that, to the best of my knowledge and belief, no dumping... monitoring report. I further certify that this facility is implementing the toxic organic management plan... POTWs shall submit a toxic organic management plan that specifies to the control authority's...
Code of Federal Regulations, 2010 CFR
2010-07-01
... with the permit limitation for total toxic organics (TTO), I certify that, to the best of my knowledge... management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to the permitting...
A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases.
Narayanasamy, Ganesh; Stathakis, Sotirios; Gutierrez, Alonso N; Pappas, Evangelos; Crownover, Richard; Floyd, John R; Papanikolaou, Niko
2017-10-01
In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R 50% ), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R 50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 ( P < .05). For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V 12 Gy but required significantly lower monitor units, when compared to RapidArc plans.
A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases
Stathakis, Sotirios; Gutierrez, Alonso N.; Pappas, Evangelos; Crownover, Richard; Floyd, John R.; Papanikolaou, Niko
2016-01-01
Background: In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Methods: Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R50%), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. Results: A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 (P < .05). Conclusion: For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V12 Gy but required significantly lower monitor units, when compared to RapidArc plans. PMID:27612917
Structure, Intent and Conformance Monitoring in ATC
NASA Technical Reports Server (NTRS)
Reynolds, Tom G.; Histon, Jonathan M.; Davison, Hayley J.; Hansman, R. John
2004-01-01
Infield studies of current Air Traffic Control operations it is found that controllers rely on underlying airspace structure to reduce the complexity of the planning and conformance monitoring tasks. The structure appears to influence the controller's working mental model through abstractions that reduce the apparent cognitive complexity. These structure-based abstractions are useful for the controller's key tasks of planning, implementing, monitoring, and evaluating tactical situations. In addition, the structure-based abstractions appear to be important in the maintenance of Situation Awareness. The process of conformance monitoring is analyzed in more detail and an approach to conformance monitoring which utilizes both the structure-based abstractions and intent is presented.
The national response for preventing healthcare-associated infections: data and monitoring.
Kahn, Katherine L; Weinberg, Daniel A; Leuschner, Kristin J; Gall, Elizabeth M; Siegel, Sari; Mendel, Peter
2014-02-01
Historically, the ability to accurately track healthcare-associated infections (HAIs) was hindered due to a lack of coordination among data sources and shortcomings in individual data sources. This paper presents the results of the evaluation of the HAI data and the monitoring component of the Action Plan, focusing on context (goals), inputs, and processes. We used the Content-Input-Process-Product framework, together with the HAI prevention system framework, to describe the transformative processes associated with data and monitoring efforts. Six HAI priority conditions in the 2009 Action Plan created a focus for the selection of goals and activities. Key Action Plan decisions included a phased-in data and monitoring approach, commitment to linking the selection of priority HAIs to highly visible national 5-year prevention targets, and the development of a comprehensive HAI database inventory. Remaining challenges relate to data validation, resources, and the opportunity to integrate electronic health and laboratory records with other provider data systems. The Action Plan's data and monitoring program has developed a sound infrastructure that builds upon technological advances and embodies a firm commitment to prioritization, coordination and alignment, accountability and incentives, stakeholder engagement, and an awareness of the need for predictable resources. With time, and adequate resources, it is likely that the investment in data-related infrastructure during the Action Plan's initial years will reap great rewards.
Some computer graphical user interfaces in radiation therapy.
Chow, James C L
2016-03-28
In this review, five graphical user interfaces (GUIs) used in radiation therapy practices and researches are introduced. They are: (1) the treatment time calculator, superficial X-ray treatment time calculator (SUPCALC) used in the superficial X-ray radiation therapy; (2) the monitor unit calculator, electron monitor unit calculator (EMUC) used in the electron radiation therapy; (3) the multileaf collimator machine file creator, sliding window intensity modulated radiotherapy (SWIMRT) used in generating fluence map for research and quality assurance in intensity modulated radiation therapy; (4) the treatment planning system, DOSCTP used in the calculation of 3D dose distribution using Monte Carlo simulation; and (5) the monitor unit calculator, photon beam monitor unit calculator (PMUC) used in photon beam radiation therapy. One common issue of these GUIs is that all user-friendly interfaces are linked to complex formulas and algorithms based on various theories, which do not have to be understood and noted by the user. In that case, user only needs to input the required information with help from graphical elements in order to produce desired results. SUPCALC is a superficial radiation treatment time calculator using the GUI technique to provide a convenient way for radiation therapist to calculate the treatment time, and keep a record for the skin cancer patient. EMUC is an electron monitor unit calculator for electron radiation therapy. Instead of doing hand calculation according to pre-determined dosimetric tables, clinical user needs only to input the required drawing of electron field in computer graphical file format, prescription dose, and beam parameters to EMUC to calculate the required monitor unit for the electron beam treatment. EMUC is based on a semi-experimental theory of sector-integration algorithm. SWIMRT is a multileaf collimator machine file creator to generate a fluence map produced by a medical linear accelerator. This machine file controls the multileaf collimator to deliver intensity modulated beams for a specific fluence map used in quality assurance or research. DOSCTP is a treatment planning system using the computed tomography images. Radiation beams (photon or electron) with different energies and field sizes produced by a linear accelerator can be placed in different positions to irradiate the tumour in the patient. DOSCTP is linked to a Monte Carlo simulation engine using the EGSnrc-based code, so that 3D dose distribution can be determined accurately for radiation therapy. Moreover, DOSCTP can be used for treatment planning of patient or small animal. PMUC is a GUI for calculation of the monitor unit based on the prescription dose of patient in photon beam radiation therapy. The calculation is based on dose corrections in changes of photon beam energy, treatment depth, field size, jaw position, beam axis, treatment distance and beam modifiers. All GUIs mentioned in this review were written either by the Microsoft Visual Basic.net or a MATLAB GUI development tool called GUIDE. In addition, all GUIs were verified and tested using measurements to ensure their accuracies were up to clinical acceptable levels for implementations.
CyberArc: a non-coplanar-arc optimization algorithm for CyberKnife
NASA Astrophysics Data System (ADS)
Kearney, Vasant; Cheung, Joey P.; McGuinness, Christopher; Solberg, Timothy D.
2017-07-01
The goal of this study is to demonstrate the feasibility of a novel non-coplanar-arc optimization algorithm (CyberArc). This method aims to reduce the delivery time of conventional CyberKnife treatments by allowing for continuous beam delivery. CyberArc uses a 4 step optimization strategy, in which nodes, beams, and collimator sizes are determined, source trajectories are calculated, intermediate radiation models are generated, and final monitor units are calculated, for the continuous radiation source model. The dosimetric results as well as the time reduction factors for CyberArc are presented for 7 prostate and 2 brain cases. The dosimetric quality of the CyberArc plans are evaluated using conformity index, heterogeneity index, local confined normalized-mutual-information, and various clinically relevant dosimetric parameters. The results indicate that the CyberArc algorithm dramatically reduces the treatment time of CyberKnife plans while simultaneously preserving the dosimetric quality of the original plans.
Dalum, Peter; Schaalma, Herman; Kok, Gerjo
2012-02-01
The objective of this project was to develop a theory- and evidence-based adolescent smoking cessation intervention using both new and existing materials. We used the Intervention Mapping framework for planning health promotion programmes. Based on a needs assessment, we identified important and changeable determinants of cessation behaviour, specified change objectives for the intervention programme, selected theoretical change methods for accomplishing intervention objectives and finally operationalized change methods into practical intervention strategies. We found that guided practice, modelling, self-monitoring, coping planning, consciousness raising, dramatic relief and decisional balance were suitable methods for adolescent smoking cessation. We selected behavioural journalism, guided practice and Motivational Interviewing as strategies in our intervention. Intervention Mapping helped us to develop as systematic adolescent smoking cessation intervention with a clear link between behavioural goals, theoretical methods, practical strategies and materials and with a strong focus on implementation and recruitment. This paper does not present evaluation data.
CyberArc: a non-coplanar-arc optimization algorithm for CyberKnife.
Kearney, Vasant; Cheung, Joey P; McGuinness, Christopher; Solberg, Timothy D
2017-06-26
The goal of this study is to demonstrate the feasibility of a novel non-coplanar-arc optimization algorithm (CyberArc). This method aims to reduce the delivery time of conventional CyberKnife treatments by allowing for continuous beam delivery. CyberArc uses a 4 step optimization strategy, in which nodes, beams, and collimator sizes are determined, source trajectories are calculated, intermediate radiation models are generated, and final monitor units are calculated, for the continuous radiation source model. The dosimetric results as well as the time reduction factors for CyberArc are presented for 7 prostate and 2 brain cases. The dosimetric quality of the CyberArc plans are evaluated using conformity index, heterogeneity index, local confined normalized-mutual-information, and various clinically relevant dosimetric parameters. The results indicate that the CyberArc algorithm dramatically reduces the treatment time of CyberKnife plans while simultaneously preserving the dosimetric quality of the original plans.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frazier, William; Baur, Gary
2015-11-03
The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.
Execution monitoring for a mobile robot system
NASA Technical Reports Server (NTRS)
Miller, David P.
1990-01-01
Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.
Dimethyl Disulfide (DMDS) Fumigant Management Plan Template Phase 2
These templates provide a framework for developing your FMP, including sections on your supervising pesticide applicator, buffer zones, emergency response plan, handler information, tarp plan, soil conditions, signage, and air monitoring plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haney, Thomas Jay
This report documents the Data Quality Objectives (DQOs) developed for the Idaho National Laboratory (INL) Site ambient air surveillance program. The development of the DQOs was based on the seven-step process recommended “for systematic planning to generate performance and acceptance criteria for collecting environmental data” (EPA 2006). The process helped to determine the type, quantity, and quality of data needed to meet current regulatory requirements and to follow U.S. Department of Energy guidance for environmental surveillance air monitoring design. It also considered the current air monitoring program that has existed at INL Site since the 1950s. The development of themore » DQOs involved the application of the atmospheric dispersion model CALPUFF to identify likely contamination dispersion patterns at and around the INL Site using site-specific meteorological data. Model simulations were used to quantitatively assess the probable frequency of detection of airborne radionuclides released by INL Site facilities using existing and proposed air monitors.« less
Use of Electronic Documentation for Quality Improvement in Hospice
Cagle, John G.; Rokoske, Franziska S.; Durham, Danielle; Schenck, Anna P.; Spence, Carol; Hanson, Laura C.
2015-01-01
Little evidence exists on the use of electronic documentation in hospice and its relationship to quality improvement practices. The purposes of this study were to: (1) estimate the prevalence of electronic documentation use in hospice; (2) identify organizational characteristics associated with use of electronic documentation; and (3) determine whether quality measurement practices differed based on documentation format (electronic vs. nonelectronic). Surveys concerning the use of electronic documentation for quality improvement practices and the monitoring of quality-related care and outcomes were collected from 653 hospices. Users of electronic documentation were able to monitor a wider range of quality-related data than users of nonelectronic documentation. Quality components such as advanced care planning, cultural needs, experience during care of the actively dying, and the number/types of care being delivered were more likely to be documented by users of electronic documentation. Use of electronic documentation may help hospices to monitor quality and compliance. PMID:22267819
StarPlan: A model-based diagnostic system for spacecraft
NASA Technical Reports Server (NTRS)
Heher, Dennis; Pownall, Paul
1990-01-01
The Sunnyvale Division of Ford Aerospace created a model-based reasoning capability for diagnosing faults in space systems. The approach employs reasoning about a model of the domain (as it is designed to operate) to explain differences between expected and actual telemetry; i.e., to identify the root cause of the discrepancy (at an appropriate level of detail) and determine necessary corrective action. A development environment, named Paragon, was implemented to support both model-building and reasoning. The major benefit of the model-based approach is the capability for the intelligent system to handle faults that were not anticipated by a human expert. The feasibility of this approach for diagnosing problems in a spacecraft was demonstrated in a prototype system, named StarPlan. Reasoning modules within StarPlan detect anomalous telemetry, establish goals for returning the telemetry to nominal values, and create a command plan for attaining the goals. Before commands are implemented, their effects are simulated to assure convergence toward the goal. After the commands are issued, the telemetry is monitored to assure that the plan is successful. These features of StarPlan, along with associated concerns, issues and future directions, are discussed.
[Compliance with guidelines by state plans for food and nutritional security in Brazil].
Machado, Mick Lennon; Gabriel, Cristine Garcia; Soar, Claudia; Mamed, Gisele Rockenbach; Machado, Patrícia Maria de Oliveira; Lacerda, Josimari Telino de; Martins, Milena Corrêa; Marcon, Maria Cristina
2018-02-05
A descriptive and documental study was performed from August to October 2016 to analyze compliance by state plans for food and nutritional security (PlanSAN) with the guidelines set by the Brazilian National Policy for Food and Nutritional Security (PNSAN). The state plans were accessed via the websites of the Inter-Ministerial Chamber for Food and Nutritional Security (CAISAN) or the state governments, plus complementary data collection at the state level. All the states of Brazil joined the National System for Food and Nutritional Security (SISAN), while fewer than half (13 states, 48%) had drafted their plans. Of these, 5 (38%) of the PlanSAN had schedules that coincided with the same state's pluriannual plan, 5 (38%) of the PlanSAN specified the budget requirements for meeting the proposed targets, 7 (54%) specified mechanisms for monitoring the plan, and only 2 (15%) defined methodologies for monitoring food and nutritional security. The recent existence of (and adherence to) the CAISAN appear to be related to the lack of state plans in half the states. Although most of the states that did have plans met some of the guidelines laid out by the PNSAN, these mechanisms become weak and impractical when they lack earmarked budget funds to meet their targets. Since the PNSAN is structurally inter-sectorial, the development of plans requires collective work by various government departments. Importantly, the items analyzed here are all guidelines, which implies the need for mechanisms to monitor their actual implementation.
Toes-Zoutendijk, Esther; van Leerdam, Monique E; Dekker, Evelien; van Hees, Frank; Penning, Corine; Nagtegaal, Iris; van der Meulen, Miriam P; van Vuuren, Anneke J; Kuipers, Ernst J; Bonfrer, Johannes M G; Biermann, Katharina; Thomeer, Maarten G J; van Veldhuizen, Harriët; Kroep, Sonja; van Ballegooijen, Marjolein; Meijer, Gerrit A; de Koning, Harry J; Spaander, Manon C W; Lansdorp-Vogelaar, Iris
2017-03-01
After careful pilot studies and planning, the national screening program for colorectal cancer (CRC), with biennial fecal immunochemical tests (FITs), was initiated in The Netherlands in 2014. A national information system for real-time monitoring was developed to allow for timely evaluation. Data were collected from the first year of this screening program to determine the importance of planning and monitoring for optimal screening program performance. The national information system of the CRC screening program kept track of the number of invitations sent in 2014, FIT kits returned, and colonoscopies performed. Age-adjusted rates of participation, the number of positive test results, and positive predictive values (PPVs) for advanced neoplasia were determined weekly, quarterly, and yearly. In 2014, there were 741,914 persons invited for FIT; of these, 529,056 (71.3%; 95% CI, 71.2%-71.4%) participated. A few months into the program, real-time monitoring showed that rates of participation and positive test results (10.6%; 95% CI, 10.5%-10.8%) were higher than predicted and the PPV was lower (42.1%; 95% CI, 41.3%-42.9%) than predicted based on pilot studies. To reduce the burden of unnecessary colonoscopies and alleviate colonoscopy capacity, the cut-off level for a positive FIT result was increased from 15 to 47 μg Hb/g feces halfway through 2014. This adjustment decreased the percentage of positive test results to 6.7% (95% CI, 6.6%-6.8%) and increased the PPV to 49.1% (95% CI, 48.3%-49.9%). In total, the first year of the Dutch screening program resulted in the detection of 2483 cancers and 12,030 advanced adenomas. Close monitoring of the implementation of the Dutch national CRC screening program allowed for instant adjustment of the FIT cut-off levels to optimize program performance. Copyright © 2017 AGA Institute. Published by Elsevier Inc. All rights reserved.
Development of Computerized Monitoring of Education Plans.
ERIC Educational Resources Information Center
Greene, J. Weldon; And Others
The District of Columbia Public Schools initiated a multiyear planning process in 1983. Among other activities, the process calls for the computerized monitoring of the critical tasks of each of the district's major offices. These tasks, defined by the offices, are designed to facilitate the achievement of specific objectives designated in the…
DOT National Transportation Integrated Search
2008-08-01
Report Abstract: : The purpose of this guide is to aid the Texas Department of Transportation (TxDOT), Metropolitan Planning Organizations (MPO), and other state and local agencies to develop an effective traffic monitoring system for new major traff...
40 CFR 52.70 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...
40 CFR 52.70 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...
77 FR 20217 - Secondary National Ambient Air Quality Standards for Oxides of Nitrogen and Sulfur
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-03
... Planning and Standards (OAQPS), U.S. Environmental Protection Agency, Mail Code C504-06, Research Triangle... of Research 3. Implementation Challenges 4. Monitoring Plan Development and Stakeholder Participation B. Summary of Proposed Evaluation of Monitoring Methods C. Comments on Field Pilot Program and...
Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round
Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round. Changes reflect performance of second round of testing at new location and with various changes to personnel. Additional changes reflect general improvements to the Version 1 test/QA...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2011 CFR
2011-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2013 CFR
2013-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2012 CFR
2012-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2014 CFR
2014-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
40 CFR 62.14453 - What must I monitor?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What must I monitor? 62.14453 Section 62.14453 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-17
... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability and Meetings... amended, NOAA is soliciting public comment on the draft management plan and draft environmental assessment... draft environmental assessment will be considered if received on or before June 22, 2012. Public...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-14
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...
Monitoring and Assuring the Quality of Digital Aerial Data
NASA Technical Reports Server (NTRS)
Christopherson, Jon
2007-01-01
This viewgraph presentation explains the USGS plan for monitoring and assuring the quality of digital aerial data. The contents include: 1) History of USGS Aerial Imaging Involvement; 2) USGS Research and Results; 3) Outline of USGS Quality Assurance Plan; 4) Other areas of Interest; and 5) Summary
Revised ground-water monitoring compliance plan for the 300 area process trenches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schalla, R.; Aaberg, R.L.; Bates, D.J.
1988-09-01
This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less
1993 Annual Report: San Francisco estuary regional monitoring program for trace substances
Thompson, B.; Lacy, Jessica; Hardin, Dane; Grovhaug, Tom; Taberski, K.; Jassby, Alan D.; Cloern, James E.; Caffrey, J.; Cole, B.; Schoellhamer, David H.
1993-01-01
Summaries of other monitoring activities pertinent to regional monitoring are also included in the Report: a description of the Regional Board’s Bay Protection Studies, the Sacramento Coordinated Monitoring Program, and a wetlands monitoring plan are included.
2009-01-01
This article is part of a series written for people responsible for making decisions about health policies and programmes and for those who support these decision makers. Policymakers have limited resources for developing – or supporting the development of – evidence-informed policies and programmes. These required resources include staff time, staff infrastructural needs (such as access to a librarian or journal article purchasing), and ongoing professional development. They may therefore prefer instead to contract out such work to independent units with more suitably skilled staff and appropriate infrastructure. However, policymakers may only have limited financial resources to do so. Regardless of whether the support for evidence-informed policymaking is provided in-house or contracted out, or whether it is centralised or decentralised, resources always need to be used wisely in order to maximise their impact. Examples of undesirable practices in a priority-setting approach include timelines to support evidence-informed policymaking being negotiated on a case-by-case basis (instead of having clear norms about the level of support that can be provided for each timeline), implicit (rather than explicit) criteria for setting priorities, ad hoc (rather than systematic and explicit) priority-setting process, and the absence of both a communications plan and a monitoring and evaluation plan. In this article, we suggest questions that can guide those setting priorities for finding and using research evidence to support evidence-informed policymaking. These are: 1. Does the approach to prioritisation make clear the timelines that have been set for addressing high-priority issues in different ways? 2. Does the approach incorporate explicit criteria for determining priorities? 3. Does the approach incorporate an explicit process for determining priorities? 4. Does the approach incorporate a communications strategy and a monitoring and evaluation plan? PMID:20018110
Lavis, John N; Oxman, Andrew D; Lewin, Simon; Fretheim, Atle
2009-12-16
This article is part of a series written for people responsible for making decisions about health policies and programmes and for those who support these decision makers. Policymakers have limited resources for developing--or supporting the development of--evidence-informed policies and programmes. These required resources include staff time, staff infrastructural needs (such as access to a librarian or journal article purchasing), and ongoing professional development. They may therefore prefer instead to contract out such work to independent units with more suitably skilled staff and appropriate infrastructure. However, policymakers may only have limited financial resources to do so. Regardless of whether the support for evidence-informed policymaking is provided in-house or contracted out, or whether it is centralised or decentralised, resources always need to be used wisely in order to maximise their impact. Examples of undesirable practices in a priority-setting approach include timelines to support evidence-informed policymaking being negotiated on a case-by-case basis (instead of having clear norms about the level of support that can be provided for each timeline), implicit (rather than explicit) criteria for setting priorities, ad hoc (rather than systematic and explicit) priority-setting process, and the absence of both a communications plan and a monitoring and evaluation plan. In this article, we suggest questions that can guide those setting priorities for finding and using research evidence to support evidence-informed policymaking. These are: 1. Does the approach to prioritisation make clear the timelines that have been set for addressing high-priority issues in different ways? 2. Does the approach incorporate explicit criteria for determining priorities? 3. Does the approach incorporate an explicit process for determining priorities? 4. Does the approach incorporate a communications strategy and a monitoring and evaluation plan?
3D conformal planning using low segment multi-criteria IMRT optimization
Khan, Fazal; Craft, David
2014-01-01
Purpose To evaluate automated multicriteria optimization (MCO) – designed for intensity modulated radiation therapy (IMRT), but invoked with limited segmentation – to efficiently produce high quality 3D conformal radiation therapy (3D-CRT) plans. Methods Ten patients previously planned with 3D-CRT to various disease sites (brain, breast, lung, abdomen, pelvis), were replanned with a low-segment inverse multicriteria optimized technique. The MCO-3D plans used the same beam geometry of the original 3D plans, but were limited to an energy of 6 MV. The MCO-3D plans were optimized using fluence-based MCO IMRT and then, after MCO navigation, segmented with a low number of segments. The 3D and MCO-3D plans were compared by evaluating mean dose for all structures, D95 (dose that 95% of the structure receives) and homogeneity indexes for targets, D1 and clinically appropriate dose volume objectives for individual organs at risk (OARs), monitor units (MUs), and physician preference. Results The MCO-3D plans reduced the OAR mean doses (41 out of a total of 45 OARs had a mean dose reduction, p<<0.01) and monitor units (seven out of ten plans have reduced MUs; the average reduction is 17%, p=0.08) while maintaining clinical standards on coverage and homogeneity of target volumes. All MCO-3D plans were preferred by physicians over their corresponding 3D plans. Conclusion High quality 3D plans can be produced using MCO-IMRT optimization, resulting in automated field-in-field type plans with good monitor unit efficiency. Adopting this technology in a clinic could improve plan quality, and streamline treatment plan production by utilizing a single system applicable to both IMRT and 3D planning. PMID:25413405
Iraq liquid radioactive waste tanks maintenance and monitoring program plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad
2011-10-01
The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less
Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric
2005-10-01
The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluatemore » the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin developed with the efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha) coho salmon and (O. kisutch) and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (BOR 1988). The most notable development was the construction and operation of Three-Mile Falls Dam (3MD) and other irrigation projects that dewatered the Umatilla River during salmon migrations. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and the Oregon Department of Fish and Wildlife (ODFW) developed the Umatilla Hatchery Master Plan to restore the historical fisheries in the basin. The plan was completed in 1990 and included the following objectives: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Produce almost 48,000 adult returns to Three-Mile Falls Dam. The goals were reviewed in 1999 and were changed to 31,500 adult salmon and steelhead returns (Table 2). We conduct core long-term monitoring activities each year as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), genetic monitoring (Currens & Schreck 1995, Narum et al. 2004), and habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998). Our project goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. This is the only project that monitors the restoration of naturally producing salmon and steelhead in the basin.« less
Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sweeney, M.D.
1995-06-13
This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench beganmore » in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.« less
NASA Astrophysics Data System (ADS)
White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.
2017-12-01
Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed heads from the previous management period and adjusted depending upon triggers outlined in the management plan. The effectiveness of water restrictions as a management technique for the purpose of maintaining supply reliability under various decision making frequencies, aquifer response times and climate scenarios was explored.
Environmental Assessment of the City of El Cerrito, CA: Creek, Trash and Air Quality Analysis
NASA Astrophysics Data System (ADS)
Moore, A.; Ilan, A.
2015-12-01
The City of El Cerrito, CA is located within Western Contra Costa County and adjacent to the San Francisco Bay. Local land-uses that affect its overall public and environmental health include major freeways, railways, and commercial and industrial zones. In an effort to assess the overall health of the local environment, students at Korematsu Middle School conducted a comprehensive analysis that included street litter auditing, water monitoring of Cerritos Creek and air quality measurements made along local streets. In 2014 the City of El Cerrito adopted a long-term trash plan that included strategies for reducing trash loads of local stormwater sewer systems. This plan called for load reduction of 70% by July 1, 2017 and 100% by July 1, 2022. To evaluate the effectiveness of the trash plan, our team quantified and scored trash concentration levels at two locations—one in a residential neighborhood and the other in a commercial zone. We also monitored water quality at nearby Cerritos Creek to investigate the impacts that each area's trash concentrations had on water quality. We also monitored particulate matter (PM) concentration levels in air within these locations to determine whether or not differences exist between residential and commercial areas. Preliminary analysis of litter data suggests that the Long Term Trash Plan has thus far been effective in reducing concentrations of street litter along San Pablo Avenue, which is located within a major commercial zone, but has been inadequate in reducing trash in nearby parks. Water quality results indicate that Cerritos Creek contains waters that are quite healthy with respect to Ammonia and Nitrate concentration levels (i.e., very low values for every sample collected). However, elevated concentration levels of Phosphates were detected in every sample collected. Air quality data surprisingly revealed that extremely high PM concentration levels occur in air surrounding a residential park in El Cerrito.
Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steward, Cleveland R.
1996-08-01
The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and releasedmore » under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild fish, including targeted chinook, non-targeted chinook, and resident species.« less
Baars, Maria A. E.; Nije Bijvank, Marije; Tonnaer, Geertje H.; Jolles, Jelle
2015-01-01
Recent studies in late adolescents (age 17+) show that brain development may proceed till around the 25th year of age. This implies that study performance in higher education could be dependent upon the stage of brain maturation and neuropsychological development. Individual differences in development of neuropsychological skills may thus have a substantial influence on the outcome of the educational process. This hypothesis was evaluated in a large survey of 1760 first-year students at a University of Applied Sciences, of which 1332 are included in the current analyses. This was because of their fit within the age range we pre-set (17–20 years' old at start of studies). Student characteristics and three behavioral ratings of executive functioning (EF) were evaluated with regard to their influence on academic performance. Self-report measures were used: self-reported attention, planning, and self-control and self-monitoring. Results showed that students with better self-reported EF at the start of the first year of their studies obtained more study credits at the end of that year than students with a lower EF self-rating. The correlation between self-control and self-monitoring on the one hand, and study progress on the other, appeared to differ for male and female students and to be influenced by the level of prior education. The results of this large-scale study could have practical relevance. The profound individual differences between students may at least partly be a consequence of their stage of development as an adolescent. Students who show lower levels of attention control, planning, and self-control/self-monitoring can be expected to have a problem in study planning and study progress monitoring and hence study progress. The findings imply that interventions directed at the training of these (executive) functions should be developed and used in higher education in order to improve academic achievement, learning attitude, and motivation. PMID:26300823
Baars, Maria A E; Nije Bijvank, Marije; Tonnaer, Geertje H; Jolles, Jelle
2015-01-01
Recent studies in late adolescents (age 17+) show that brain development may proceed till around the 25th year of age. This implies that study performance in higher education could be dependent upon the stage of brain maturation and neuropsychological development. Individual differences in development of neuropsychological skills may thus have a substantial influence on the outcome of the educational process. This hypothesis was evaluated in a large survey of 1760 first-year students at a University of Applied Sciences, of which 1332 are included in the current analyses. This was because of their fit within the age range we pre-set (17-20 years' old at start of studies). Student characteristics and three behavioral ratings of executive functioning (EF) were evaluated with regard to their influence on academic performance. Self-report measures were used: self-reported attention, planning, and self-control and self-monitoring. Results showed that students with better self-reported EF at the start of the first year of their studies obtained more study credits at the end of that year than students with a lower EF self-rating. The correlation between self-control and self-monitoring on the one hand, and study progress on the other, appeared to differ for male and female students and to be influenced by the level of prior education. The results of this large-scale study could have practical relevance. The profound individual differences between students may at least partly be a consequence of their stage of development as an adolescent. Students who show lower levels of attention control, planning, and self-control/self-monitoring can be expected to have a problem in study planning and study progress monitoring and hence study progress. The findings imply that interventions directed at the training of these (executive) functions should be developed and used in higher education in order to improve academic achievement, learning attitude, and motivation.
Urban remote sensing applications: TIMS observations of the City of Scottsdale
NASA Technical Reports Server (NTRS)
Christensen, Philip R.; Melendrez, David E.; Anderson, Donald L.; Hamilton, Victoria E.; Wenrich, Melissa L.; Howard, Douglas
1995-01-01
A research program has been initiated between Arizona State University and the City of Scottsdale, Arizona to study the potential applications of TIMS (Thermal Infrared Multispectral Scanner) data for urban scene classification, desert environmental assessment, and change detection. This program is part of a long-term effort to integrate remote sensing observations into state and local planning activities to improve decision making and future planning. Specific test sites include a section of the downtown Scottsdale region that has been mapped in very high detail as part of a pilot program to develop an extensive GIS database. This area thus provides excellent time history of the evolution of the city infrastructure, such as the timing and composition of street repavement. A second area of study includes the McDowell intensive study by state and local agencies to assess potential sites for urban development as well as preservation. These activities are of particular relevance as the Phoenix metropolitan area undergoes major expansion into the surrounding desert areas. The objectives of this study in urban areas are aimed at determining potential applications of TIMS data for classifying and assessing land use and surface temperatures. Land use centers on surface impermeability studies for storm runoff assessment and pollution control. These studies focus on determining the areal abundance of urban vegetation and undeveloped soil. Highly experimental applications include assessment and monitoring of pavement condition. Temperature studies focus on determining swimming pool area and temperature for use in monitoring evaporating and urban water consumption. These activities are of particular relevance as the Phoenix metropolitan area undergoes major expansion into the surrounding desert area.
[Monitoring social determinants of health].
Espelt, Albert; Continente, Xavier; Domingo-Salvany, Antonia; Domínguez-Berjón, M Felicitas; Fernández-Villa, Tania; Monge, Susana; Ruiz-Cantero, M Teresa; Perez, Glòria; Borrell, Carme
2016-11-01
Public health surveillance is the systematic and continuous collection, analysis, dissemination and interpretation of health-related data for planning, implementation and evaluation of public health initiatives. Apart from the health system, social determinants of health include the circumstances in which people are born, grow up, live, work and age, and they go a long way to explaining health inequalities. A surveillance system of the social determinants of health requires a comprehensive and social overview of health. This paper analyses the importance of monitoring social determinants of health and health inequalities, and describes some relevant aspects concerning the implementation of surveillance during the data collection, compilation and analysis phases, as well as dissemination of information and evaluation of the surveillance system. It is important to have indicators from sources designed for this purpose, such as continuous records or periodic surveys, explicitly describing its limitations and strengths. The results should be published periodically in a communicative format that both enhances the public's ability to understand the problems that affect them, whilst at the same time empowering the population, with the ultimate goal of guiding health-related initiatives at different levels of intervention. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.
Puls, Amy L.; Anlauf Dunn, Kara; Graham Hudson, Bernadette
2014-01-01
The lower Columbia River and its tributaries once supported abundant runs of salmon and steelhead; however, there are five species currently listed under the federal Endangered Species Act (ESA). The National Marine Fisheries Service has completed, and is proposing for adoption, a comprehensive ESA Recovery Plan for the Lower Columbia Evolutionarily Significant Units (ESUs) based on the recovery plans developed by Oregon and Washington. One of the primary factors attributed to the decline of these species is habitat degradation. There are numerous entities conducting status and/or trends monitoring of instream habitat in the lower Columbia River Basin, but because the programs were developed for agency specific reasons, the existing monitoring efforts are not well coordinated, and often lack the spatial coverage, certainty, or species coverage necessary to answer questions related to status and trends of the ESA listed populations. The Pacific Northwest Aquatic Monitoring Partnership’s Integrated Status and Trends Monitoring (ISTM) project was initiated to improve integration of existing and new monitoring efforts by developing recommendations for sampling frames, protocols, and data sharing. In an effort to meet the ISTM project goals, five objectives were identified: (1) identify and prioritize decisions, questions, and monitoring objectives, (2) evaluate how existing programs align with these management decisions, questions, and objectives, (3) identify the most appropriate monitoring design to inform priority management decisions, questions, and objectives, (4) use trade-off analysis to develop specific recommendations for monitoring based on outcomes of Objectives 1-3 and (5) recommend implementation and reporting mechanisms. This report summarizes the effort to address Objectives 1 and 2, detailing the commonalities among the habitat characteristics that all entities measure and monitor, and how the metrics align with the priorities listed in the comprehensive recovery plan for the Lower Columbia ESUs.
40 CFR 130.9 - Designation and de-designation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...
High priority needs for range-wide monitoring of North American landbirds
Dunn, Erica H.; Altman, B.L.; Bart, J.; Beardmore, C.J.; Berlanga, H.; Blancher, P.J.; Butcher, G.S.; Demarest, D.W.; Dettmers, R.; Hunter, W.C.; Iñigo-Elias, Eduardo E.; Panjabi, A.O.; Pashley, D.N.; Ralph, C.J.; Rich, T.D.; Rosenberg, K.V.; Rustay, C.M.; Ruth, J.M.; Will, T.C.
2005-01-01
This document is an extension of work done for the Partners in Flight North American Landbird Conservation Plan (Rich et al. 2004). The Continental Plan reviewed conservation status of the 448 native landbird species that regularly breed in the United States and Canada. Two groups of species were identified as having high conservation importance: the PIF Watch List, made up of species for which there is conservation concern, and Stewardship Spices that are particularly characteristic of regional avifaunas. In addition, continental scale monitoring needs were identified for all species. Here we extend the monitoring needs aspect of the Plan, providing additional detail and suggesting the best means of filling the gaps in broad-scale, long-term trend monitoring. This analysis and report was compiled by the Partners in Flight (PIF) Science Committee as a contribution to current work by the North American Bird Conservation Initiative to assess the status of bird population monitoring in North America and to make recommendations for improvements.
Comprehensive assessment of toxic emissions from coal-fired power plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, T D; Schmidt, C E; Radziwon, A S
1991-01-01
The Pittsburgh Energy Technology Center (PETC) of the US Department of Energy (DOE) has two current investigations, initiated before passage of the Clean Air Act Amendment (CAAA), that will determine the air toxic emissions from coal-fired electric utilities. DOE has contracted with Battelle Memorial Institute and Radian corporation to conduct studies focusing on the potential air toxics, both organic and inorganic, associated with different size fractions of fine particulate matter emitted from power plant stacks. Table 2 indicates the selected analytes to be investigated during these studies. PETC is also developing guidance on the monitoring of Hazardous Air Pollutants (HAPS)more » to be incorporated in the Environmental Monitoring plans for the demonstration projects in its Clean Coal Technology Program.« less
NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolich, George; Mizell, Steve; McCurdy, Greg
2017-10-01
Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring.« less
2014-01-01
Background Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. Methods We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Results Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Conclusions Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process. PMID:24428945
Rutten, Geert M; Harting, Janneke; Bartholomew, Leona K; Braspenning, Jozé C; van Dolder, Rob; Heijmans, Marcel Fgj; Hendriks, Erik Jm; Kremers, Stef Pj; van Peppen, Roland Ps; Rutten, Steven Tj; Schlief, Angelique; de Vries, Nanne K; Oostendorp, Rob Ab
2014-01-15
Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process.
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2012 CFR
2012-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2011 CFR
2011-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2014 CFR
2014-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2013 CFR
2013-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
Assessment of the Monitor Unit Objective tool for VMAT in the Eclipse treatment planning system.
Jiménez-Puertas, Sara; Sánchez-Artuñedo, David; Hermida-López, Marcelino
2018-01-01
This work aims to achieve the highest possible monitor units (MU) reduction using the MU Objective tool included in the Eclipse treatment planning system, while preserving the plan quality. The treatment planning system Eclipse (Varian Medical Systems, Palo Alto, CA) includes a control mechanism for the number of monitor units of volumetric modulated arc therapy (VMAT) plans, named the MU Objective tool. Forty prostate plans, 20 gynecological plans and 20 head and neck plans designed with VMAT were retrospectively studied. Each plan ( base plan ) was optimized without using the MU Objective tool, and it was re-optimized with different values of the Maximum MU ( MaxMU ) parameter of the MU Objective tool. MU differences were analyzed with a paired samples t -test and changes in plan quality were assessed with a set of parameters for OARs and PTVs. The average relative MU difference [Formula: see text] considering all treatment sites, was the highest when MaxMU = 400 (-4.2%, p < 0.001). For prostate plans, the lowest [Formula: see text] was obtained (-3.7%, p < 0.001). For head and neck plans [Formula: see text] was -7.3% ( p < 0.001) and for gynecological plans [Formula: see text] was 7.0% ( p = 0.002). Although similar MU reductions were observed for both sites, for some gynecological plans maximum differences were greater than 10%. All the assessed parameters for PTVs and OARs sparing showed average differences below 2%. For the three studied clinical sites, establishing MaxMU = 400 led to the optimum MU reduction, maintaining the original dose distribution and dosimetric parameters practically unaltered.
Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry
2003-06-09
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less
Kazis, Lewis E; Selim, Alfredo J; Rogers, William; Qian, Shirley X; Brazier, John
2012-01-01
The Veterans RAND 12-Item Health Survey (VR-12) is one of the major patient-reported outcomes for ranking the Medicare Advantage (MA) plans in the Health Outcomes Survey (HOS). Approaches for scoring physical and mental health are given using contemporary norms and regression estimators. A new metric approach for the VR-12 called the "VR-6D" is presented with case-mix adjustments for monitoring plans that combine utilities and mortality. Results show that the models for ranking health outcomes of the plans are robust and credible. Future directions include the use of utilities for evaluating and ranking of MA plans.
Evaluation of the Monitor-CTA Automatic Vehicle Monitoring System
DOT National Transportation Integrated Search
1974-03-01
In June 1972 the Urban Mass Transportation Administration requested that the Transportation System Center of DOT perform an evaluation of the CTA (Chicago Transit Authority) Monitor-Automatic Vehicle Monitor (AVM) system. TSC planned the overall eval...
Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mizell, Steve A.; Campbell, Scott A.; McCurdy, Greg
The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) as a result of storm runoff. This activity supports U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM-NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transportedmore » radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. Air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content are collected at the meteorological station. The maximum, minimum, and average or total values (as appropriate) for each of these parameters are recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrology station are also recorded for every 10-minute interval. This report presents data collected from these stations during fiscal year (FY) 2017.« less
Educational Technology, E.C.I.A. Chapter 2. Final Evaluation Report.
ERIC Educational Resources Information Center
District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.
The Planning, Monitoring and Implementing (PMI) Evaluation Model for Decision-Making was used by the District of Columbia Public Schools to monitor their Office of Educational Technology in its efforts to provide direction and coordination for computer related activities, and to plan and implement educational television projects in math and…
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.
This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... direct final rule in the Federal Register informing the public that the rule will not take effect... maintenance period, a commitment to maintain the existing monitoring network, factors and procedures to be... Network Indiana currently operates two SO 2 monitors in Lake County, Indiana. Indiana has committed to...
40 CFR 62.14454 - How must I monitor the required parameters?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How must I monitor the required parameters? 62.14454 Section 62.14454 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital...
No-migration variance petition. Appendices C--J: Volume 5, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-03-01
Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.
Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linard, Joshua; Campbell, Sam
Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less
75 FR 9392 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-02
... monitoring; require electronic monitoring; and address other elements of catch monitoring in the Atlantic... development of catch monitoring alternatives for inclusion in Amendment 5 to the Atlantic Herring Fishery Management Plan (FMP); alternatives may include management measures to: improve quota monitoring and...
Heat Production During Countermeasure Exercises Planned for the International Space Station
NASA Technical Reports Server (NTRS)
Rapley, Michael G.; Lee, Stuart M. C.; Guilliams, Mark E.; Greenisen, Michael C.; Schneider, Suzanne M.
2004-01-01
This investigation's purpose was to determine the amount of heat produced when performing aerobic and resistance exercises planned as part of the exercise countermeasures prescription for the ISS. These data will be used to determine thermal control requirements of the Node 1 and other modules where exercise hardware might reside. To determine heat production during resistive exercise, 6 subjects using the iRED performed 5 resistance exercises which form the core exercises of the current ISS resistive exercise countermeasures. Each exerciser performed a warm-up set at 50% effort, then 3 sets of increasing resistance. We measured oxygen consumption and work during each exercise. Heat loss was calculated as the difference between the gross energy expenditure (minus resting metabolism) and the work performed. To determine heat production during aerobic exercise, 14 subjects performed an interval, cycle exercise protocol and 7 subjects performed a continuous, treadmill protocol. Each 30-min. exercise is similar to exercises planned for ISS. Oxygen consumption monitored continuously during the exercises was used to calculate the gross energy expenditure. For cycle exercise, work performed was calculated based on the ergometer's resistance setting and pedaling frequency. For treadmill, total work was estimated by assuming 25% work efficiency and subtracting the calculated heat production and resting metabolic rate from the gross energy expenditure. This heat production needs to be considered when determining the location of exercise hardware on ISS and designing environmental control systems. These values reflect only the human subject s produced heat; heat produced by the exercise hardware also will contribute to the heat load.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Q; Read, P
Purpose: Multiple error pathways can lead to delivery errors during the treatment course that cannot be caught with pre-treatment QA. While in vivo solutions are being developed for linacs, no such solution exists for tomotherapy. The purpose of this study is to develop a near real-time system for tomotherapy that can monitor the delivery and dose accumulation process during the treatment-delivery, which enable the user to assess the impact of delivery variations and/or errors and to interrupt the treatment if necessary. Methods: A program running on a tomotherapy planning station fetches the raw DAS data during treatment. Exit detector datamore » is extracted as well as output, gantry angle, and other machine parameters. For each sample, the MLC open-close state is determined. The delivered plan is compared with the original plan via a Monte Carlo dose engine which transports fluence deviations from a pre-treatment Monte Carlo run. A report containing the difference in fluence, dose and DVH statistics is created in html format. This process is repeated until the treatment is completed. Results: Since we only need to compute the dose for the difference in fluence for a few projections each time, dose with 2% statistical uncertainty can be computed in less than 1 second on a 4-core cpu. However, the current bottleneck in this near real-time system is the repeated fetching and processing the growing DAS data file throughout the delivery. The frame rate drops from 10Hz at the beginning of treatment to 5Hz after 3 minutes and to 2Hz after 10 minutes. Conclusion: A during-treatment delivery monitor system has been built to monitor tomotherapy treatments. The system improves patient safety by allowing operators to assess the delivery variations and errors during treatment delivery and adopt appropriate actions.« less
Planned Environmental Microbiology Aspects of Future Lunar and Mars Missions
NASA Technical Reports Server (NTRS)
Ott, C. Mark; Castro, Victoria A.; Pierson, Duane L.
2006-01-01
With the establishment of the Constellation Program, NASA has initiated efforts designed similar to the Apollo Program to return to the moon and subsequently travel to Mars. Early lunar sorties will take 4 crewmembers to the moon for 4 to 7 days. Later missions will increase in duration up to 6 months as a lunar habitat is constructed. These missions and vehicle designs are the forerunners of further missions destined for human exploration of Mars. Throughout the planning and design process, lessons learned from the International Space Station (ISS) and past programs will be implemented toward future exploration goals. The standards and requirements for these missions will vary depending on life support systems, mission duration, crew activities, and payloads. From a microbiological perspective, preventative measures will remain the primary techniques to mitigate microbial risk. Thus, most of the effort will focus on stringent preflight monitoring requirements and engineering controls designed into the vehicle, such as HEPA air filters. Due to volume constraints in the CEV, in-flight monitoring will be limited for short-duration missions to the measurement of biocide concentration for water potability. Once long-duration habitation begins on the lunar surface, a more extensive environmental monitoring plan will be initiated. However, limited in-flight volume constraints and the inability to return samples to Earth will increase the need for crew capabilities in determining the nature of contamination problems and method of remediation. In addition, limited shelf life of current monitoring hardware consumables and limited capabilities to dispose of biohazardous trash will drive flight hardware toward non-culture based methodologies, such as hardware that rapidly distinguishes biotic versus abiotic surface contamination. As missions progress to Mars, environmental systems will depend heavily on regeneration of air and water and biological waste remediation and regeneration systems, increasing the need for environmental monitoring. Almost complete crew autonomy will be needed for assessment and remediation of contamination problems. Cabin capacity will be limited; thus, current methods of microbial monitoring will be inadequate. Future methodology must limit consumables, and these consumables must have a shelf life of over three years. In summary, missions to the moon and Mars will require a practical design that prudently uses available resources to mitigate microbial risk to the crew.
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less
Oechsner, Markus; Odersky, Leonhard; Berndt, Johannes; Combs, Stephanie Elisabeth; Wilkens, Jan Jakob; Duma, Marciana Nona
2015-12-01
The purpose of this study was to assess the impact on dose to the planning target volume (PTV) and organs at risk (OAR) by using four differently generated CT datasets for dose calculation in stereotactic body radiotherapy (SBRT) of lung and liver tumors. Additionally, dose differences between 3D conformal radiotherapy and volumetric modulated arc therapy (VMAT) plans calculated on these CT datasets were determined. Twenty SBRT patients, ten lung cases and ten liver cases, were retrospectively selected for this study. Treatment plans were optimized on average intensity projection (AIP) CTs using 3D conformal radiotherapy (3D-CRT) and volumetric modulated arc therapy (VMAT). Afterwards, the plans were copied to the planning CTs (PCT), maximum intensity projection (MIP) and mid-ventilation (MidV) CT datasets and dose was recalculated keeping all beam parameters and monitor units unchanged. Ipsilateral lung and liver volumes and dosimetric parameters for PTV (Dmean, D2, D98, D95), ipsilateral lung and liver (Dmean, V30, V20, V10) were determined and statistically analysed using Wilcoxon test. Significant but small mean differences were found for PTV dose between the CTs (lung SBRT: ≤2.5 %; liver SBRT: ≤1.6 %). MIPs achieved the smallest lung and the largest liver volumes. OAR mean doses in MIP plans were distinctly smaller than in the other CT datasets. Furthermore, overlapping of tumors with the diaphragm results in underestimated ipsilateral lung dose in MIP plans. Best agreement was found between AIP and MidV (lung SBRT). Overall, differences in liver SBRT were smaller than in lung SBRT and VMAT plans achieved slightly smaller differences than 3D-CRT plans. Only small differences were found for PTV parameters between the four CT datasets. Larger differences occurred for the doses to organs at risk (ipsilateral lung, liver) especially for MIP plans. No relevant differences were observed between 3D-CRT or VMAT plans. MIP CTs are not appropriate for OAR dose assessment. PCT, AIP and MidV resulted in similar doses. If a 4DCT is acquired PCT can be omitted using AIP or MidV for treatment planning.
30 CFR 250.221 - What environmental monitoring information must accompany the EP?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What environmental monitoring information must... monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP: (a) Monitoring systems. A description of any existing and planned...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 9 2014-07-01 2014-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 9 2013-07-01 2013-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 9 2012-07-01 2012-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 9 2011-07-01 2011-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
An airborne remote sensing system for urban air quality
NASA Technical Reports Server (NTRS)
Duncan, L. J.; Friedman, E. J.; Keitz, E. L.; Ward, E. A.
1974-01-01
Several NASA sponsored remote sensors and possible airborne platforms were evaluated. Outputs of dispersion models for SO2 and CO pollution in the Washington, D.C. area were used with ground station data to establish the expected performance and limitations of the remote sensors. Aircraft/sensor support requirements are discussed. A method of optimum flight plan determination was made. Cost trade offs were performed. Conclusions about the implementation of various instrument packages as parts of a comprehensive air quality monitoring system in Washington are presented.
[Design of a HACCP plan for the industrial process of frozen sardines].
Rosas, Patricia; Reyes, Genara
2009-09-01
The Hazard Analysis and Critical Control Point (HACCP) is a system to identify, assess and control the hazards related with production, processing, distribution and consumption in order to get safe food. The aim of this study was to design a HACCP plan for implementing in processing line of frozen whole sardine (Sardinella aurita). The methodology was based in the evaluation of the accomplishment of the pre-requisite programs (GMP/SSOP in a previous study), the application of the principles of the HACCP and the sequence of stages settles down by the COVENIN Venezuelan standard No 3802. Time-temperature was recorded in each processing step. Histamine was determined by VERATOX NEOGEN. Results showed that some sardine batches arrived to the plant with high time-temperature records, finding up to 5 ppm of histamine due to the abuse of temperature during transportation. A HACCP plan is proposed with the scope, the selection of the team, the description of the product and the intended use, the flow diagram of the process, hazard analysis and identification of CCP, monitoring system, corrective actions and records. The potential hazards were identified as pathogen growth, presence of histamine and physical objects in the sardines. The control measures of PCC are referred as control of time-temperature during transportation and processing, monitoring of ice supplies and sanitary conditions in the process.
Rowe, Gary L.; Belitz, Kenneth; Demas, Charlie R.; Essaid, Hedeff I.; Gilliom, Robert J.; Hamilton, Pixie A.; Hoos, Anne B.; Lee, Casey J.; Munn, Mark D.; Wolock, David W.
2013-01-01
This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate. However, a combination of funding growth and extensive collaboration with other USGS programs and other Federal, State, and local agencies, public interest groups, professional and trade associations, academia, and private industry will be needed to fully realize the monitoring and modeling goals laid out in this plan (USGS Fact Sheet 2013-3008).
GNSS-based multi-sensor system for structural monitoring applications
NASA Astrophysics Data System (ADS)
Bogusz, Janusz; Figurski, Mariusz; Nykiel, Grzegorz; Szolucha, Marcin; Wrona, Maciej
2012-03-01
In 2007 the Centre of Applied Geomatics of the Military University of Technology started measurements aimed at the monitoring of the dynamic state of the engineering structures using GNSS. The complexity of the problem forced us to apply an integrated system architecture. This concept is based on simultaneous measuring some selected elements of the structure using various types of sensors. Measurement information from numerous instruments is numerically integrated for determining the investigated parameter, e.g., the displacement vector. The CAG team performed the tests using such a system on the two permanent 500-meters long bridges, the temporary bridge crossing for military purposes and the 300-meters high chimney of the CHP station. The information about displacement vector together with the characteristic frequencies of the structure were determined using different techniques for increasing of its reliability. This paper presents the results of such tests, gives description of the integrated system designed in the CAG and brings forward with the plans for the future.
Arora, Monika; Chauhan, Kavita; John, Shoba; Mukhopadhyay, Alok
2011-01-01
Major noncommunicable diseases (NCDs) share common behavioral risk factors and deep-rooted social determinants. India needs to address its growing NCD burden through health promoting partnerships, policies, and programs. High-level political commitment, inter-sectoral coordination, and community mobilization are important in developing a successful, national, multi-sectoral program for the prevention and control of NCDs. The World Health Organization's “Action Plan for a Global Strategy for Prevention and Control of NCDs” calls for a comprehensive plan involving a whole-of-Government approach. Inter-sectoral coordination will need to start at the planning stage and continue to the implementation, evaluation of interventions, and enactment of public policies. An efficient multi-sectoral mechanism is also crucial at the stage of monitoring, evaluating enforcement of policies, and analyzing impact of multi-sectoral initiatives on reducing NCD burden in the country. This paper presents a critical appraisal of social determinants influencing NCDs, in the Indian context, and how multi-sectoral action can effectively address such challenges through mainstreaming health promotion into national health and development programs. India, with its wide socio-cultural, economic, and geographical diversities, poses several unique challenges in addressing NCDs. On the other hand, the jurisdiction States have over health, presents multiple opportunities to address health from the local perspective, while working on the national framework around multi-sectoral aspects of NCDs. PMID:22628911
Dynamic Monitoring of Cleanroom Fallout Using an Air Particle Counter
NASA Technical Reports Server (NTRS)
Perry, Radford
2011-01-01
The particle fallout limitations and periodic allocations for the James Webb Space Telescope are very stringent. Standard prediction methods are complicated by non-linearity and monitoring methods that are insufficiently responsive. A method for dynamically predicting the particle fallout in a cleanroom using air particle counter data was determined by numerical correlation. This method provides a simple linear correlation to both time and air quality, which can be monitored in real time. The summation of effects provides the program better understanding of the cleanliness and assists in the planning of future activities. Definition of fallout rates within a cleanroom during assembly and integration of contamination-sensitive hardware, such as the James Webb Space Telescope, is essential for budgeting purposes. Balancing the activity levels for assembly and test with the particle accumulation rate is paramount. The current approach to predicting particle fallout in a cleanroom assumes a constant air quality based on the rated class of a cleanroom, with adjustments for projected work or exposure times. Actual cleanroom class can also depend on the number of personnel present and the type of activities. A linear correlation of air quality and normalized particle fallout was determined numerically. An air particle counter (standard cleanroom equipment) can be used to monitor the air quality on a real-time basis and determine the "class" of the cleanroom (per FED-STD-209 or ISO-14644). The correlation function provides an area coverage coefficient per class-hour of exposure. The prediction of particle accumulations provides scheduling inputs for activity levels and cleanroom class requirements.
DOT National Transportation Integrated Search
2017-03-01
The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...
ERIC Educational Resources Information Center
Wallen, Carl C.
1975-01-01
The global atmospheric monitoring plans of the World Meteorological Organization are detailed. Single and multipurpose basic monitoring systems and the monitoring of chemical properties are discussed. The relationship of the World Meteorological Organization with the United Nations environment program is discussed. A map of the World…
Smith, Ryan L; Haworth, Annette; Panettieri, Vanessa; Millar, Jeremy L; Franich, Rick D
2016-05-01
Verification of high dose rate (HDR) brachytherapy treatment delivery is an important step, but is generally difficult to achieve. A technique is required to monitor the treatment as it is delivered, allowing comparison with the treatment plan and error detection. In this work, we demonstrate a method for monitoring the treatment as it is delivered and directly comparing the delivered treatment with the treatment plan in the clinical workspace. This treatment verification system is based on a flat panel detector (FPD) used for both pre-treatment imaging and source tracking. A phantom study was conducted to establish the resolution and precision of the system. A pretreatment radiograph of a phantom containing brachytherapy catheters is acquired and registration between the measurement and treatment planning system (TPS) is performed using implanted fiducial markers. The measured catheter paths immediately prior to treatment were then compared with the plan. During treatment delivery, the position of the (192)Ir source is determined at each dwell position by measuring the exit radiation with the FPD and directly compared to the planned source dwell positions. The registration between the two corresponding sets of fiducial markers in the TPS and radiograph yielded a registration error (residual) of 1.0 mm. The measured catheter paths agreed with the planned catheter paths on average to within 0.5 mm. The source positions measured with the FPD matched the planned source positions for all dwells on average within 0.6 mm (s.d. 0.3, min. 0.1, max. 1.4 mm). We have demonstrated a method for directly comparing the treatment plan with the delivered treatment that can be easily implemented in the clinical workspace. Pretreatment imaging was performed, enabling visualization of the implant before treatment delivery and identification of possible catheter displacement. Treatment delivery verification was performed by measuring the source position as each dwell was delivered. This approach using a FPD for imaging and source tracking provides a noninvasive method of acquiring extensive information for verification in HDR prostate brachytherapy.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Ryan L., E-mail: ryan.smith@wbrc.org.au; Millar, Jeremy L.; Franich, Rick D.
Purpose: Verification of high dose rate (HDR) brachytherapy treatment delivery is an important step, but is generally difficult to achieve. A technique is required to monitor the treatment as it is delivered, allowing comparison with the treatment plan and error detection. In this work, we demonstrate a method for monitoring the treatment as it is delivered and directly comparing the delivered treatment with the treatment plan in the clinical workspace. This treatment verification system is based on a flat panel detector (FPD) used for both pre-treatment imaging and source tracking. Methods: A phantom study was conducted to establish the resolutionmore » and precision of the system. A pretreatment radiograph of a phantom containing brachytherapy catheters is acquired and registration between the measurement and treatment planning system (TPS) is performed using implanted fiducial markers. The measured catheter paths immediately prior to treatment were then compared with the plan. During treatment delivery, the position of the {sup 192}Ir source is determined at each dwell position by measuring the exit radiation with the FPD and directly compared to the planned source dwell positions. Results: The registration between the two corresponding sets of fiducial markers in the TPS and radiograph yielded a registration error (residual) of 1.0 mm. The measured catheter paths agreed with the planned catheter paths on average to within 0.5 mm. The source positions measured with the FPD matched the planned source positions for all dwells on average within 0.6 mm (s.d. 0.3, min. 0.1, max. 1.4 mm). Conclusions: We have demonstrated a method for directly comparing the treatment plan with the delivered treatment that can be easily implemented in the clinical workspace. Pretreatment imaging was performed, enabling visualization of the implant before treatment delivery and identification of possible catheter displacement. Treatment delivery verification was performed by measuring the source position as each dwell was delivered. This approach using a FPD for imaging and source tracking provides a noninvasive method of acquiring extensive information for verification in HDR prostate brachytherapy.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-08
... NMFS, copies of addenda to FY 2012 sector operations plans detailing industry-funded monitoring plans... from Federal fishing regulations through its annual operations plan (for more information on sector operations plans and regulatory exemptions, see the fishing year 2012 sector operations plan proposed rule...
Abbas, Ahmar S; Moseley, Douglas; Kassam, Zahra; Kim, Sun Mo; Cho, Charles
2013-05-06
Recently, volumetric-modulated arc therapy (VMAT) has demonstrated the ability to deliver radiation dose precisely and accurately with a shorter delivery time compared to conventional intensity-modulated fixed-field treatment (IMRT). We applied the hypothesis of VMAT technique for the treatment of thoracic esophageal carcinoma to determine superior or equivalent conformal dose coverage for a large thoracic esophageal planning target volume (PTV) with superior or equivalent sparing of organs-at-risk (OARs) doses, and reduce delivery time and monitor units (MUs), in comparison with conventional fixed-field IMRT plans. We also analyzed and compared some other important metrics of treatment planning and treatment delivery for both IMRT and VMAT techniques. These metrics include: 1) the integral dose and the volume receiving intermediate dose levels between IMRT and VMATI plans; 2) the use of 4D CT to determine the internal motion margin; and 3) evaluating the dosimetry of every plan through patient-specific QA. These factors may impact the overall treatment plan quality and outcomes from the individual planning technique used. In this study, we also examined the significance of using two arcs vs. a single-arc VMAT technique for PTV coverage, OARs doses, monitor units and delivery time. Thirteen patients, stage T2-T3 N0-N1 (TNM AJCC 7th edn.), PTV volume median 395 cc (range 281-601 cc), median age 69 years (range 53 to 85), were treated from July 2010 to June 2011 with a four-field (n = 4) or five-field (n = 9) step-and-shoot IMRT technique using a 6 MV beam to a prescribed dose of 50 Gy in 20 to 25 F. These patients were retrospectively replanned using single arc (VMATI, 91 control points) and two arcs (VMATII, 182 control points). All treatment plans of the 13 study cases were evaluated using various dose-volume metrics. These included PTV D99, PTV D95, PTV V9547.5Gy(95%), PTV mean dose, Dmax, PTV dose conformity (Van't Riet conformation number (CN)), mean lung dose, lung V20 and V5, liver V30, and Dmax to the spinal canal prv3mm. Also examined were the total plan monitor units (MUs) and the beam delivery time. Equivalent target coverage was observed with both VMAT single and two-arc plans. The comparison of VMATI with fixed-field IMRT demonstrated equivalent target coverage; statistically no significant difference were found in PTV D99 (p = 0.47), PTV mean (p = 0.12), PTV D95 and PTV V9547.5Gy (95%) (p = 0.38). However, Dmax in VMATI plans was significantly lower compared to IMRT (p = 0.02). The Van't Riet dose conformation number (CN) was also statistically in favor of VMATI plans (p = 0.04). VMATI achieved lower lung V20 (p = 0.05), whereas lung V5 (p = 0.35) and mean lung dose (p = 0.62) were not significantly different. The other OARs, including spinal canal, liver, heart, and kidneys showed no statistically significant differences between the two techniques. Treatment time delivery for VMATI plans was reduced by up to 55% (p = 5.8E-10) and MUs reduced by up to 16% (p = 0.001). Integral dose was not statistically different between the two planning techniques (p = 0.99). There were no statistically significant differences found in dose distribution of the two VMAT techniques (VMATI vs. VMATII) Dose statistics for both VMAT techniques were: PTV D99 (p = 0.76), PTV D95 (p = 0.95), mean PTV dose (p = 0.78), conformation number (CN) (p = 0.26), and MUs (p = 0.1). However, the treatment delivery time for VMATII increased significantly by two-fold (p = 3.0E-11) compared to VMATI. VMAT-based treatment planning is safe and deliverable for patients with thoracic esophageal cancer with similar planning goals, when compared to standard IMRT. The key benefit for VMATI was the reduction in treatment delivery time and MUs, and improvement in dose conformality. In our study, we found no significant difference in VMATII over single-arc VMATI for PTV coverage or OARs doses. However, we observed significant increase in delivery time for VMATII compared to VMATI.
Strategies for monitoring terrestrial animals and habitats
Richard Holthausen; Raymond L. Czaplewski; Don DeLorenzo; Greg Hayward; Winifred B. Kessler; Pat Manley; Kevin S. McKelvey; Douglas S. Powell; Leonard F. Ruggiero; Michael K. Schwartz; Bea Van Horne; Christina D. Vojta
2005-01-01
This General Technical Report (GTR) addresses monitoring strategies for terrestrial animals and habitats. It focuses on monitoring associated with National Forest Management Act planning and is intended to apply primarily to monitoring efforts that are broader than individual National Forests. Primary topics covered in the GTR are monitoring requirements; ongoing...
40 CFR 63.505 - Parameter monitoring levels and excursions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... less than 4 hours in an operating day and more than two of the hours during the period of operation do... filling period for the storage vessel, is above the maximum level or below the minimum level established... plan, during the filling period for the storage vessel. (ii) If the monitoring plan does not specify...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
... draft plans for Photochemical Assessment Monitoring Stations (PAMS) Network Re-engineering. DATES: A... information concerning the EPA CASAC can be found at the EPA CASAC Web site at http://www.epa.gov/casac . Any inquiry regarding EPA's draft plans for PAMS Network Re-engineering should be directed to Mr. Kevin...
Monitoring the Effective and Efficient Use of Land: The English Approach
NASA Astrophysics Data System (ADS)
Ganser, Robin
In England quantified targets for the reuse of brownfields and of existing buildings place particular requirements on the planning system as part of the overall strategy to make effective use of natural resources. Achieving these targets is not free of obstacles and potential conflicts. Therefore monitoring of policy implementation is a necessity in the planning system.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... monitoring will achieve detection and quantification of CO 2 in the event surface leakage occurs. The UIC... leakage detection monitoring system or technical specifications should also be described in the MRV plan... of injected CO 2 or from another cause (e.g. natural variability). The MRV plan leakage detection and...
ERIC Educational Resources Information Center
Van Ongevalle, Jan; Huyse, Huib; Van Petegem, Peter
2013-01-01
This article reports on the results of an action research project (2010-13) in which ten Belgian organizations who implement development education programmes explored different planning, monitoring, and evaluation (PME) approaches with the aim of learning more effectively about their results. PME approaches piloted included outcome mapping, most…
9 CFR 56.10 - Initial State response and containment plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
.../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...
9 CFR 56.10 - Initial State response and containment plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
.../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...
9 CFR 56.10 - Initial State response and containment plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
.../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...
9 CFR 56.10 - Initial State response and containment plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
.../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...
Improving Student Achievement through a Systematic Instructional Monitoring Plan.
ERIC Educational Resources Information Center
Mahan, David J.
Based on four very basic but important premises, the Instructional Monitoring Plan has resulted in significant learning gains by middle school students in the St. Louis (Missouri) public school system. First, the staff must define what is to be taught by the teacher and learned by the students. Second, all faculty members must be aware of the…
40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...
40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...
Developing Inventory and Monitoring Programs Based on Multiple Objectives
Daniel L. Schmoldt; David L. Peterson; David G. Silsbee
1995-01-01
Resource inventory and monitoring (I&M) programs in national parks combine multiple objectives in order to create a plan of action over a finite time horizon. Because all program activities are constrained by time and money, it is critical to plan I&M activities that make the best use of available agency resources. However, multiple objectives complicate a...
40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...
NASA Technical Reports Server (NTRS)
Niebur, Dagmar
1995-01-01
Electric power systems represent complex systems involving many electrical components whoseoperation has to be planned, analyzed, monitored and controlled. The time-scale of tasks in electricpower systems extends from long term planning years ahead to milliseconds in the area of control. The behavior of power systems is highly non-linear. Monitoring and control involves several hundred variables which are only partly available by measurements.
District Computer Concerns: Checklist for Monitoring Instructional Use of Computers.
ERIC Educational Resources Information Center
Coe, Merilyn
Designed to assist those involved with planning, organizing, and implementing computer use in schools, this checklist can be applied to: (1) assess the present state of instructional computer use in the district; (2) assist with the development of plans or guidelines for computer use; (3) support a start-up phase; and (4) monitor the…
Gas hydrate environmental monitoring program in the Ulleung Basin, East Sea of Korea
NASA Astrophysics Data System (ADS)
Ryu, Byong-Jae; Chun, Jong-Hwa; McLean, Scott
2013-04-01
As a part of the Korean National Gas Hydrate Program, the Korea Institute of Geoscience and Mineral Resources (KIGAM) has been planned and conducted the environmental monitoring program for the gas hydrate production test in the Ulleung Basin, East Sea of Korea in 2014. This program includes a baseline survey using a KIGAM Seafloor Observation System (KISOS) and R/V TAMHAE II of KIGAM, development of a KIGAM Seafloor Monitoring System (KIMOS), and seafloor monitoring on various potential hazards associated with the dissociated gas from gas hydrates during the production test. The KIGAM also plans to conduct the geophysical survey for determining the change of gas hydrate reservoirs and production-efficiency around the production well before and after the production test. During production test, release of gas dissociated from the gas hydrate to the water column, seafloor deformation, changes in chemical characteristics of bottom water, changes in seafloor turbidity, etc. will be monitored by using the various monitoring instruments. The KIMOS consists of a near-field observation array and a far-field array. The near-field array is constructed with four remote sensor platforms each, and cabled to the primary node. The far-field sensor array will consists of four autonomous instrument pods. A scientific Remotely Operated Vehicle (ROV) will be used to deploy the sensor arrays, and to connect the cables to each field instrument package and a primary node. A ROV will also be tasked to collect the water and/or gas samples, and to identify any gas (bubble) plumes from the seafloor using a high-frequency sector scanning sonar. Power to the near-field instrument packages will be supplied by battery units located on the seafloor near the primary node. Data obtained from the instruments on the near-field array will be logged and downloaded in-situ at the primary node, and transmitted real-time to the support vessel using a ROV. These data will also be transmitted real-time to the drilling vessel via satellite.
Ponte, S; Gabrielli, S; Jonsdottir, J; Morando, M; Dellepiane, S
2015-01-01
This paper describes the biomedical, remote monitoring infrastructure developed and currently tested in the EU REHAB@HOME project to support home rehabilitation of the upper extremity of persons post-stroke and in persons with other neurological disorders, such as Multiple Sclerosis patients, in order to track their progress over therapy and improve their Quality of Life. The paper will specifically focus on describing the initial testing of the tele-rehabilitation system's components for patients' biomedical monitoring over therapy, which support the delivery and monitoring of more personalized, engaging plans of care by rehabilitation centers and services.
Kayser, Georgia L; Moriarty, Patrick; Fonseca, Catarina; Bartram, Jamie
2013-10-11
Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator--service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-06-01
This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of variousmore » water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.« less
Kayser, Georgia L.; Moriarty, Patrick; Fonseca, Catarina; Bartram, Jamie
2013-01-01
Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator—service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled. PMID:24157507
A Regional Approach to Wildlife Monitoring Related to Energy Exploration and Development in Colorado
Kotliar, Natasha B.; Bowen, Zachary H.; Ouren, Douglas S.; Farmer, Adrian H.
2008-01-01
The U.S. Bureau of Land Management (BLM) is currently developing a National Monitoring Strategy that will guide efforts to create an efficient and effective process for monitoring land health by BLM. To inform the ongoing development of the national strategy, BLM selected two States (Colorado, Alaska) to serve as focal areas on which to base a flexible framework for developing monitoring programs that evaluate wildlife responses to energy development. We developed a three-phase monitoring plan to serve as a template and applied it to the design of a monitoring program for the Colorado focal area (White River and Glenwood Springs Field Offices of the BLM). Phase I is a synthesis and assessment of current conditions that capitalizes on existing but under used data sources. A key component is the use of existing habitat and landscape models to evaluate the cumulative effects of surface disturbance. Phase II is the data collection process that uses information provided in Phase I to refine management objectives and provide a linkage to management decisions. The linkage is established through targeted monitoring, adaptive management, and research. Phase III establishes priorities and strategies for regional and national monitoring, and facilitates coordination among other land management agencies and organizations. The three phases are designed to be flexible and complementary. The monitoring plan guides an iterative process that is performed incrementally, beginning with the highest-priority species and management issues, while building on lessons learned and coordination among administrative levels. The activities associated with each phase can be repeated or updated as new information, data, or tools become available. This allows the development of a monitoring program that expands gradually and allows for rapid implementation. A demonstration application of the three-phase monitoring plan was conducted for a study area encompassing five BLM field offices in Colorado: White River, Glenwood Springs, Kremmling, Grand Junction, and Little Snake. The overall study area was selected to encompass the primary distribution of sagebrush and greater sage-grouse (Centrocercus urophasianus) in Colorado and to provide a larger context for evaluating priority management issues of the White River and Glenwood Springs Field Offices. Within the study area, we selected an additional scale of analysis: the Roan Plateau, an area of increased energy development. We focused our demonstration project on the primary objectives identified by the BLM and other stakeholders: (1) How do we evaluate the cumulative effects of energy development and mitigation activities on species of management interest or concern? (2) How can cumulative effects, including direct and indirect effects, be quantified relative to natural variation? (3) How can we implement compliance and effectiveness monitoring to determine whether lease stipulations are met and restoration/mitigation goals are achieved? We targeted greater sage-grouse because this species was identified as a monitoring priority for the White River Field Office. We also evaluated landscape-level indices to address fragmentation resulting from surface disturbance. The primary purpose of this exercise was to highlight the types of analyses and approaches that could be used to evaluate energy development in an application of the three-phase framework. We provide examples of Phase I products that can be used to guide the refinement of management objectives, development of adaptive management and research frameworks, and planning activities in Phase II. Finally, we report on the BLM's National Sage-Grouse Habitat Conservation Strategy as an example of Phase III activities. The development of an effective monitoring program is a daunting task, and will be difficult to implement by the BLM independently due to the current work load of staff. However, the scientific expertise and experience for developing cr
Olmedo, Luis; Bejarano, Ester; Lugo, Humberto; Murillo, Eduardo; Seto, Edmund; Wong, Michelle; King, Galatea; Wilkie, Alexa; Meltzer, Dan; Carvlin, Graeme; Jerrett, Michael; Northcross, Amanda
2017-01-01
Summary: The Imperial County Community Air Monitoring Network (the Network) is a collaborative group of community, academic, nongovernmental, and government partners designed to fill the need for more detailed data on particulate matter in an area that often exceeds air quality standards. The Network employs a community-based environmental monitoring process in which the community and researchers have specific, well-defined roles as part of an equitable partnership that also includes shared decision-making to determine study direction, plan research protocols, and conduct project activities. The Network is currently producing real-time particulate matter data from 40 low-cost sensors throughout Imperial County, one of the largest community-based air networks in the United States. Establishment of a community-led air network involves engaging community members to be citizen-scientists in the monitoring, siting, and data collection process. Attention to technical issues regarding instrument calibration and validation and electronic transfer and storage of data is also essential. Finally, continued community health improvements will be predicated on facilitating community ownership and sustainability of the network after research funds have been expended. https://doi.org/10.1289/EHP1772 PMID:28886604
Vegetation monitoring for Guatemala: a comparison between simulated VIIRS and MODIS satellite data
Boken, Vijendra K.; Easson, Gregory L.; Rowland, James
2010-01-01
The advanced very high resolution radiometer (AVHRR) and moderate resolution imaging spectroradiometer (MODIS) data are being widely used for vegetation monitoring across the globe. However, sensors will discontinue collecting these data in the near future. National Aeronautics and Space Administration is planning to launch a new sensor, visible infrared imaging radiometer suite (VIIRS), to continue to provide satellite data for vegetation monitoring. This article presents a case study of Guatemala and compares the simulated VIIRS-Normalized Difference Vegetation Index (NDVI) with MODIS-NDVI for four different dates each in 2003 and 2005. The dissimilarity between VIIRS-NDVI and MODIS-NDVI was examined on the basis of the percent difference, the two-tailed student's t-test, and the coefficient of determination, R 2. The per cent difference was found to be within 3%, the p-value ranged between 0.52 and 0.99, and R 2 exceeded 0.88 for all major types of vegetation (basic grains, rubber, sugarcane, coffee and forests) found in Guatemala. It was therefore concluded that VIIRS will be almost equally capable of vegetation monitoring as MODIS.
Development of noSQL data storage for the ATLAS PanDA Monitoring System
NASA Astrophysics Data System (ADS)
Ito, H.; Potekhin, M.; Wenaus, T.
2012-12-01
For several years the PanDA Workload Management System has been the basis for distributed production and analysis for the ATLAS experiment at the LHC. Since the start of data taking PanDA usage has ramped up steadily, typically exceeding 500k completed jobs/day by June 2011. The associated monitoring data volume has been rising as well, to levels that present a new set of challenges in the areas of database scalability and monitoring system performance and efficiency. These challenges are being met with an R&D effort aimed at implementing a scalable and efficient monitoring data storage based on a noSQL solution (Cassandra). We present our motivations for using this technology, as well as data design and the techniques used for efficient indexing of the data. We also discuss the hardware requirements as they were determined by testing with actual data and realistic rate of queries. In conclusion, we present our experience with operating a Cassandra cluster over an extended period of time and with data load adequate for planned application.
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
40 CFR 270.62 - Hazardous waste incinerator permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction.... (iii) A detailed description of sampling and monitoring procedures, including sampling and monitoring locations in the system, the equipment to be used, sampling and monitoring frequency, and planned analytical...
NASA Astrophysics Data System (ADS)
Field, R. A.; Soltis, J.; Murphy, S. M.; Montague, D. C.
2013-12-01
Methane emissions from the oil and gas sector have become part of a wider debate of the magnitude of climate change impacts from different fossil fuels. This debate is contentious, as a wide range of estimates of development area leakage rates have been postulated. Here we present the results of mobile monitoring performed in the Pinedale Anticline, WY (PAPA) development. A 4-hour circuit upwind, downwind and within the development was designed to determine methane distributions relative to background concentrations. The circuit was repeated thirty-two times to assess the influence of meteorology and emission sources upon measured values. Figure 1 is a composite of methane data for the project. This pilot project enabled identification of areas and emission sources for subsequent plume quantification studies planned for 2014. Here we present the finding of the circuits through mapping and site comparisons. Along with the methane measurements, mobile ozone and oxides of nitrogen observations were also performed, thereby facilitating a better understanding of the phenomenon of wintertime ground level ozone. Building upon surveys from 2012, we also carried out canister measurements of VOC at selected sites to demonstrate the importance of relating methane and selected VOC concentrations when identifying variations in the contributions of emission sources to ambient measurements. While methane and C2 to C5 alkanes elevations are widespread and highly correlated, those of higher molecular weight VOC, in particular benzene, toluene and xylene isomers, show the importance of emission sources other than wet gas leakage. We discuss the utility of 3D visualization of methane data for illustrating the distribution of leakage relative to emission sources. The influence of emission sources and meteorology upon the data is explored through a comparative analysis of the circuit data. This assessment sets the foundation for planned plume quantification. Finally we compare the mobile data with 1-minute data from the Wyoming DEQ site at Boulder, WY, to determine how well the site represents conditions in the surrounding area. Effective policy decisions require better coupling of air quality measurements and emission inventories. We outline an approach that links regulatory network site data with mobile monitoring and plume quantification that should reduce uncertainty for determining the magnitude of methane emissions from oil and gas sources. Pinedale Anticline methane concentrations for mobile monitoring circuits 2/12/2013 to 3/8/2013
Chloropicrin Fumigant Management Plan Phase 2 Templates
These forms provide a framework for detailing the FMP elements of pesticide products containing the active ingredient chloropicrin, including application block, buffer zones, emergency response plan, tarp plan, soil conditions, and air monitoring.
Recommendations for data monitoring committees from the Clinical Trials Transformation Initiative.
Calis, Karim A; Archdeacon, Patrick; Bain, Raymond; DeMets, David; Donohue, Miriam; Elzarrad, M Khair; Forrest, Annemarie; McEachern, John; Pencina, Michael J; Perlmutter, Jane; Lewis, Roger J
2017-08-01
Background/aims Use of data monitoring committees to oversee clinical trials was first proposed nearly 50 years ago. Since then, data monitoring committee use in clinical trials has increased and evolved. Nonetheless, there are no well-defined criteria for determining the need for a data monitoring committee, and considerable variability exists in data monitoring committee composition and conduct. To understand and describe the role and function of data monitoring committees, and establish best practices for data monitoring committee trial oversight, the Clinical Trials Transformation Initiative-a public-private partnership to improve clinical trials-launched a multi-stakeholder project. Methods The data monitoring committee project team included 16 individuals charged with (1) clarifying the purpose of data monitoring committees, (2) identifying best practices for independent data monitoring committee conduct, (3) describing effective communication practices, and (4) developing strategies for training data monitoring committee members. Evidence gathering included a survey, a series of focus group discussions, and a 2-day expert meeting aimed at achieving consensus opinions that form the foundation of our data monitoring committee recommendations. Results We define the role of the data monitoring committee as an advisor to the research sponsor on whether to continue, modify, or terminate a trial based on periodic assessment of trial data. Data monitoring committees should remain independent from the sponsor and be composed of members with no relevant conflicts of interest. Representation on a data monitoring committee generally should include at least one clinician with expertise in the therapeutic area being studied, a biostatistician, and a designated chairperson who has experience with clinical trials and data monitoring. Data monitoring committee meetings are held periodically to evaluate the unmasked data from ongoing trials, but the content and conduct of meetings may vary depending on specific goals or topics for deliberation. To guide data monitoring committee conduct and communication plans, a charter consistent with the protocol's research design and statistical analysis plan should be developed and agreed upon by the sponsor and the data monitoring committee prior to patient enrollment. We recommend concise and flexible charters that explain roles, responsibilities, operational issues, and how data monitoring committee recommendations are generated and communicated. The demand for data monitoring committee members appears to exceed the current pool of qualified individuals. To prepare a new generation of trained data monitoring committee members, we encourage a combination of didactic educational programs, practical experience, and skill development through apprenticeships and mentoring by experienced data monitoring committee members. Conclusion Our recommendations address data monitoring committee use, conduct, communication practices, and member preparation and training. Furthermore recommendations form the foundation for ongoing efforts to improve clinical trial oversight and enhance the safety and integrity of clinical research. These recommendations serve as a call to action for implementation of best practices that benefit study participants, study sponsors, and society.
Some computer graphical user interfaces in radiation therapy
Chow, James C L
2016-01-01
In this review, five graphical user interfaces (GUIs) used in radiation therapy practices and researches are introduced. They are: (1) the treatment time calculator, superficial X-ray treatment time calculator (SUPCALC) used in the superficial X-ray radiation therapy; (2) the monitor unit calculator, electron monitor unit calculator (EMUC) used in the electron radiation therapy; (3) the multileaf collimator machine file creator, sliding window intensity modulated radiotherapy (SWIMRT) used in generating fluence map for research and quality assurance in intensity modulated radiation therapy; (4) the treatment planning system, DOSCTP used in the calculation of 3D dose distribution using Monte Carlo simulation; and (5) the monitor unit calculator, photon beam monitor unit calculator (PMUC) used in photon beam radiation therapy. One common issue of these GUIs is that all user-friendly interfaces are linked to complex formulas and algorithms based on various theories, which do not have to be understood and noted by the user. In that case, user only needs to input the required information with help from graphical elements in order to produce desired results. SUPCALC is a superficial radiation treatment time calculator using the GUI technique to provide a convenient way for radiation therapist to calculate the treatment time, and keep a record for the skin cancer patient. EMUC is an electron monitor unit calculator for electron radiation therapy. Instead of doing hand calculation according to pre-determined dosimetric tables, clinical user needs only to input the required drawing of electron field in computer graphical file format, prescription dose, and beam parameters to EMUC to calculate the required monitor unit for the electron beam treatment. EMUC is based on a semi-experimental theory of sector-integration algorithm. SWIMRT is a multileaf collimator machine file creator to generate a fluence map produced by a medical linear accelerator. This machine file controls the multileaf collimator to deliver intensity modulated beams for a specific fluence map used in quality assurance or research. DOSCTP is a treatment planning system using the computed tomography images. Radiation beams (photon or electron) with different energies and field sizes produced by a linear accelerator can be placed in different positions to irradiate the tumour in the patient. DOSCTP is linked to a Monte Carlo simulation engine using the EGSnrc-based code, so that 3D dose distribution can be determined accurately for radiation therapy. Moreover, DOSCTP can be used for treatment planning of patient or small animal. PMUC is a GUI for calculation of the monitor unit based on the prescription dose of patient in photon beam radiation therapy. The calculation is based on dose corrections in changes of photon beam energy, treatment depth, field size, jaw position, beam axis, treatment distance and beam modifiers. All GUIs mentioned in this review were written either by the Microsoft Visual Basic.net or a MATLAB GUI development tool called GUIDE. In addition, all GUIs were verified and tested using measurements to ensure their accuracies were up to clinical acceptable levels for implementations. PMID:27027225
Burton, R; Mauk, D
1993-03-01
By integrating customer satisfaction planning and industrial engineering techniques when examining internal costs and efficiencies, materiel managers are able to better realize what concepts will best meet their customers' needs. Defining your customer(s), applying industrial engineering techniques, completing work sampling studies, itemizing recommendations and benefits to each alternative, performing feasibility and cost-analysis matrixes and utilizing resources through productivity monitoring will get you on the right path toward selecting concepts to use. This article reviews the above procedures as they applied to one hospital's decision-making process to determine whether to incorporate a stockless inventory program. Through an analysis of customer demand, the hospital realized that stockless was the way to go, but not by outsourcing the function--the hospital incorporated an in-house stockless inventory program.
A joint urban planning and public health framework: contributions to health impact assessment.
Northridge, Mary E; Sclar, Elliott
2003-01-01
A joint urban planning and public health perspective is articulated here for use, in health impact assessment. Absent a blueprint for a coherent and supportive structure on which to test our thinking, we are bound to fall flat. Such a perspective is made necessary by the sheer number of people living in cities throughout the world, the need for explicit attention to land use and transportation systems as determinants of population health, and the dearth of useful indicators of the built environment for monitoring progress. If explicit attention is not paid to the overarching goals of equality and democracy, they have little if any chance of being realized in projects, programs, and policies that shape the built environment and therefore the public's health.
Applicability of ERTS to Antarctic iceberg resources. [harvesting icebergs for fresh water
NASA Technical Reports Server (NTRS)
Hult, J. L.; Ostrander, N. C.
1974-01-01
This investigation explores the applicability of ERTS to: (1) determine the Antarctic sea ice and environmental behavior that may influence the harvesting of icebergs, and (2) monitor iceberg locations, characteristics, and evolution. Imagery sampling in the western Antarctic between the Peninsula and the Ross Sea is used in the analysis. It is found that the potential applicability of ERTS to the research, planning, and harvesting operations can contribute importantly to the glowing promise derived from broader scope studies for the use of Antarctic icebergs to relieve a growing global thirst for fresh water. Several years of comprehensive monitoring will be necessary to characterize sea-ice and environmental behavior and iceberg evolution. Live ERTS services will assist harvesting control and claiming operations and offer a means for harmonizing entitlements to iceberg resources.
36 CFR 219.11 - Monitoring and evaluation for adaptive management.
Code of Federal Regulations, 2011 CFR
2011-07-01
... viability is high and population characteristics cannot be reliably inferred from ecological conditions. The...) Monitoring and evaluation of social and economic sustainability. The plan monitoring strategy for the monitoring and evaluation of social and economic sustainability should provide for periodic review of...
40 CFR 51.190 - Ambient air quality monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...
40 CFR 51.190 - Ambient air quality monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...
40 CFR 51.190 - Ambient air quality monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...
40 CFR 51.190 - Ambient air quality monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...
40 CFR 51.190 - Ambient air quality monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...
The current status and future prospects of computer-assisted hip surgery.
Inaba, Yutaka; Kobayashi, Naomi; Ike, Hiroyuki; Kubota, So; Saito, Tomoyuki
2016-03-01
The advances in computer assistance technology have allowed detailed three-dimensional preoperative planning and simulation of preoperative plans. The use of a navigation system as an intraoperative assistance tool allows more accurate execution of the preoperative plan, compared to manual operation without assistance of the navigation system. In total hip arthroplasty using CT-based navigation, three-dimensional preoperative planning with computer software allows the surgeon to determine the optimal angle of implant placement at which implant impingement is unlikely to occur in the range of hip joint motion necessary for daily activities of living, and to determine the amount of three-dimensional correction for leg length and offset. With the use of computer navigation for intraoperative assistance, the preoperative plan can be precisely executed. In hip osteotomy using CT-based navigation, the navigation allows three-dimensional preoperative planning, intraoperative confirmation of osteotomy sites, safe performance of osteotomy even under poor visual conditions, and a reduction in exposure doses from intraoperative fluoroscopy. Positions of the tips of chisels can be displayed on the computer monitor during surgery in real time, and staff other than the operator can also be aware of the progress of surgery. Thus, computer navigation also has an educational value. On the other hand, its limitations include the need for placement of trackers, increased radiation exposure from preoperative CT scans, and prolonged operative time. Moreover, because the position of a bone fragment cannot be traced after osteotomy, methods to find its precise position after its movement need to be developed. Despite the need to develop methods for the postoperative evaluation of accuracy for osteotomy, further application and development of these systems are expected in the future. Copyright © 2016 The Japanese Orthopaedic Association. Published by Elsevier B.V. All rights reserved.
Development of a smart timber bridge - a five-year plan
Brent M. Phares; Terry J. Wipf; Ursula Deza; James P. Wacker
2011-01-01
This paper outlines a 5-year research plan for the development of a structural health monitoring system for timber bridges. A series of studies identify and evaluate various sensing technologies for measurement of structural adequacy and/or deterioration parameters. The overall goal is to develop a turn-key system to analyze, monitor, and report on the performance and...
2013-01-28
and coordination services by planning for and adapting to a rapidly changing military mission. 2. Restore the longleaf pine ecosystem and recover...success by supporting the Eglin AFB NRS adaptive management efforts through statistically sound, scientifically based monitoring of community...conservation targets, including sandhills, flatwoods, steepheads, seepage slopes, and stream habitats. Ecological monitoring supports adaptive
Design of an ecological monitoring strategy for the Forest Plan in the Pacific Northwest
Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett
2003-01-01
The growing literature on ecosystem management describes an adaptive system in which monitoring measures progress toward goals, increases our knowledge, and improves our plans (e.g., Holling 1978; Walters 1986; Duffus III 1994; Everett et al. 1994; Grumbine 1994; Bormann et al. 1995; Gunderson et al. 1995; Interagency Ecosystem Management Task Force 1995; Montgomery et...
Multilevel semantic analysis and problem-solving in the flight-domain
NASA Technical Reports Server (NTRS)
Chien, R. T.
1982-01-01
The use of knowledge-base architecture and planning control; mechanisms to perform an intelligent monitoring task in the flight domain is addressed. The route level, the trajectory level, and parts of the aerodynamics level are demonstrated. Hierarchical planning and monitoring conceptual levels, functional-directed mechanism rationalization, and using deep-level mechanism models for diagnoses of dependent failures are discussed.
Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070
NASA Technical Reports Server (NTRS)
Wilson, Deborah M.; Miller, Ralinda R.
2015-01-01
The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.
Dazomet Fumigant Management Plan Phase 2 Templates
These templates provide a framework for reporting application block information, buffer zones, emergency response plan, tarp plan, soil conditions, air monitoring, and more for pesticide products containing the active ingredient dazomet, such as Basamid G.