Sample records for monitoring plan femp

  1. Sustainable Federal Fleets: Deploying Electric Vehicles and Electric Vehicle Supply Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for Sustainable Federal Fleets. To assist agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams.

  2. REopt Screenings Catalyze Development of Hundreds of Megawatts of Renewable Energy for Federal Agencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Federal Energy Management Program (FEMP) offers renewable energy project assistance to federal agencies, which often begins with a desktop screening to develop a prioritized portfolio of project opportunities. FEMP uses the National Renewable Energy Laboratory's REopt energy planning platform to screen potential renewable energy opportunities at a single site or across a range of sites. REopt helps organizations prioritize the most economi­cally and technically viable projects for further study and identifies the size and mix of technologies that meet the orga­nization's goals at minimum cost, along with the optimal operating strategies.

  3. Water Management Planning: A Case Study at Blue Grass Army Depot

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solana, Amy E.; Mcmordie, Katherine

    2006-04-03

    Executive Order 13123, Greening the Government Through Efficient Energy Management, mandates an aggressive policy for reducing potable water consumption at federal facilities. Implementation guid¬ance from the U.S. Department of Energy (DOE) set a requirement for each federal agency to “reduce potable water usage by implementing life cycle, cost-effective water efficiency programs that include a water management plan, and not less than four Federal Energy Management Program (FEMP) Best Manage¬ment Practices (BMPs).” The objective of this plan is to gain full compliance with Executive Order 13123 and associated DOE implementation guidance on behalf of Blue Grass Army Depot (BGAD), Richmond, Kentucky.more » In accordance with this plan, BGAD must: • Incorporate the plan as a component of the Installation energy conservation plan • Investigate the water savings potential and life-cycle cost effectiveness of the Operations and Maintenance (O&M) and retrofit/replacement options associated with the ten FEMP BMPs • Put into practice all applicable O&M options • Identify retrofit/replacement options appropriate for implementation (based upon calculation of the simple payback periods) • Establish a schedule for implementation of applicable and cost-effective retrofit/replacement options.« less

  4. REopt Screenings Catalyze Development of Hundreds of Megawatts of Renewable Energy for Federal Agencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) offers project assistance to federal agencies, which often begins with a desktop screening to develop a prioritized portfolio of renewable energy project opportunities. FEMP uses the National Renewable Energy Laboratory's (NREL) REopt energy planning platform to quickly and efficiently screen potential renewable energy opportunities at a single site or across a range of sites. REopt helps organizations prioritize the most economically and technically viable projects for further study, and identifies the size and mix of technologies that meet the organization's goals at minimum cost, along with the optimal operatingmore » strategies.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    HADLEY, S.W.

    This document was prepared at the request of the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) under its Technical Guidance and Assistance and Project Financing Programs. The purpose was to provide an estimate of the national potential for combined heat and power (also known as CHP; cogeneration; or cooling, heating, and power) applications at federal facilities and the associated costs and benefits including energy and emission savings. The report provides a broad overview for the U.S. Department of Energy (DOE) and other agencies on when and where CHP systems are most likely to serve the government's bestmore » interest. FEMP's mission is to reduce the cost to and environmental impact of the federal government by advancing energy efficiency and water conservation, promoting the use of renewable energy, and improving utility management decisions at federal sites. FEMP programs are driven by its customers: federal agency sites. FEMP monitors energy efficiency and renewable energy technology developments and mounts ''technology-specific'' programs to make technologies that are in strong demand by agencies more accessible. FEMP's role is often one of helping the federal government ''lead by example'' through the use of advanced energy efficiency/renewable energy (EERE) technologies in its own buildings and facilities. CHP was highlighted in the Bush Administration's National Energy Policy Report as a commercially available technology offering extraordinary benefits in terms of energy efficiencies and emission reductions. FEMP's criteria for emphasizing a technology are that it must be commercially available; be proven but underutilized; have a strong constituency and momentum; offer large energy savings and other benefits of interest to federal sites and FEMP mission; be in demand; and carry sufficient federal market potential. As discussed in the report, CHP meets all of these criteria. Executive Order 13123 directs federal facilities to use CHP when life-cycle costs indicate energy reduction goals will be met. FEMP can assist facilities to conduct this analysis. The model developed for this report estimates the magnitude of CHP that could be implemented under various performance and economic assumptions associated with different applications. This model may be useful for other energy technologies. It can be adapted to estimate the market potential in federal buildings for any energy system based on the cost and performance parameters that a user desires to assess. The model already incorporates a standard set of parameters based on available data for federal buildings including total building space, building type, energy use intensity, fuel costs, and the performance of many prime movers commonly used in CHP applications. These and other variables can be adjusted to meet user needs or updated in the future as new data become available.« less

  6. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were usedmore » to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.« less

  7. 2008 Federal Energy Management Program (FEMP) Market Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  8. 77 FR 32621 - Developing Large-Scale Renewable Energy Projects at Federal Facilities Using Private Capital Draft

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... consider comments and recommendations on the draft guidebook, which is available at: http://www1.eere... draft guidebook is available at: http://www1.eere.energy.gov/femp/pdfs/largereguide.pdf . DOE will... DATES section. More information on DOE's FEMP is available at: http://www1.eere.energy.gov/femp...

  9. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1,more » 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.« less

  10. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  11. About the Federal Energy Management Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richard Kidd

    2009-04-23

    Richard Kidd, Program Manager for the Federal Energy Management Program (FEMP), presents a discussion on FEMP direction and its future role, federal funding trends, future financing trends, and Earth Day observations.

  12. 77 FR 40059 - Designation of a Class of Employees for Addition to the Special Exposure Cohort

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Center (FMPC) in Fernald, Ohio, also known as the Fernald Environmental Management Project (FEMP), as an... Environmental Management Project (FEMP), from January 1, 1968, through December 31, 1978, for a number of work...

  13. 75 FR 78231 - Management of Energy and Water Efficiency in Federal Buildings: Availability of Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... Buildings) is available at: http://www1.eere.energy.gov/femp/pdfs/draft_EISA_project_guidance.pdf DATES... at: http://www1.eere.energy.gov/femp/pdfs/draft_EISA_project_guidance.pdf . DOE will accept comments...

  14. 76 FR 22685 - Interagency Management Task Force Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Force Public Meeting AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy (DOE... meetings of the Interagency Energy Management Task Force (Task Force) in 2011. FEMP intends to hold recurring public meetings of the Task Force. Interested parties can check http://www.femp.energy.gov/news...

  15. Centrifugal shot blasting. Innovative technology summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1999-07-01

    At the US Department of Energy (DOE) Fernald Environmental Management Project (FEMP), the Facilities Closure and Demolition Projects Integrated Remedial Design/Remedial Action (RD/RA) work plan calls for the removal of one inch (1 in) depth of concrete surface in areas where contamination with technetium-99 has been identified. This report describes a comparative demonstration between two concrete removal technologies: an innovative system using Centrifugal Shot Blasting (CSB) and a modified baseline technology called a rotary drum planer.

  16. 75 FR 29933 - Energy Efficiency and Sustainable Design Standards for New Federal Buildings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... guidance, discount rates, and energy price projections are determined annually by FEMP and the Energy... Technology Handbook 135: ``Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis.'' FEMP... DEPARTMENT OF ENERGY 10 CFR Parts 433 and 435 [Docket No. EE-RM/STD-02-112] RIN 1904-AC13 Energy...

  17. Prediction study of structural, elastic and electronic properties of FeMP (M = Ti, Zr, Hf) compounds

    NASA Astrophysics Data System (ADS)

    Tanto, A.; Chihi, T.; Ghebouli, M. A.; Reffas, M.; Fatmi, M.; Ghebouli, B.

    2018-06-01

    First principles calculations are applied in the study of FeMP (M = Ti, Zr, Hf) compounds. We investigate the structural, elastic, mechanical and electronic properties by combining first-principles calculations with the CASTEP approach. For ideal polycrystalline FeMP (M = Ti, Zr, Hf) the shear modulus, Young's modulus, Poisson's ratio, elastic anisotropy indexes, Pugh's criterion, elastic wave velocities and Debye temperature are also calculated from the single crystal elastic constants. The shear anisotropic factors and anisotropy are obtained from the single crystal elastic constants. The Debye temperature is calculated from the average elastic wave velocity obtained from shear and bulk modulus as well as the integration of elastic wave velocities in different directions of the single crystal.

  18. The Path to Savings: Understanding the Federal Purchase of Energy-Consuming Products

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Margaret; Fujita, K. Sydny

    Energy efficiency has been a federal procurement policy objective since at least 1992, with the origin of the Energy Efficient Product Procurement (EEPP) program within the larger Federal Energy Management Program (FEMP). Today, the EEPP program’s mandate is based on requirements that 95% of new contract actions, task orders, and delivery orders for products and services be energy and water efficient, as laid out in Executive Order 13514 in 2009. Facilitating full compliance with EO 13514 presents a significant strategic planning challenge to the FEMP EEPP program, given the size of the federal government, the range of missions of itsmore » many agencies, the mix of management approaches for its buildings, and the diverse set of roughly 80 energy efficient products which has been established through preceding legislation and executive orders. The goal of this report is to aid the program in prioritizing its resources by providing an overview of how the purchase of energy-consuming products occurs in today’s evolving federal procurement system, as well as identify likely intervention points and compliance review mechanisms. Through a synthesis of the literature on U.S. federal sector procurement and two dozen primary interviews, the report particularly focuses on the importance of price in determining the actor(s) responsible for any given purchase of an energy-consuming product. This identification is important, as the relevant actors are trained and reviewed in different ways that the FEMP EEPP program can prioritize for targeting, based on the decision criteria such as the potential energy savings associated with the actor’s purchases or the administrative ease of the intervention.« less

  19. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency Release 3.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Operations and Maintenance (O&M) Best Practices Guide was developed under the direction of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government’s implementation of sound, cost effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

  20. Field monitoring and evaluation of a residential gas-engine-driven heat pump: Volume 2, Heating season

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, J.D.

    1995-11-01

    The Federal Government is the largest single energy consumer in the United States; consumption approaches 1.5 quads/year of energy (1 quad = 10{sup 15} Btu) at a cost valued at nearly $10 billion annually. The US Department of Energy (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the Federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US Government. Pacific Northwest Laboratory (PNL) is one of four DOE national multiprogram laboratories that participate in themore » NTDP by providing technical expertise and equipment to evaluate new, energy-saving technologies being studied and evaluated under that program. This two-volume report describes a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology -- a gas-engine-driven heat pump. The unit was installed at a single residence at Fort Sam Houston, a US Army base in San Antonio, Texas, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were York International, the heat pump manufacturer; Gas Research Institute (GRI), the technology developer; City Public Service of San Antonio, the local utility; American Gas Cooling Center (AGCC); Fort Sam Houston; and PNL.« less

  1. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and othermore » environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malone, Elizabeth L.; Sanquist, Tom; Wolfe, Amy K.

    This document is part of a larger, programmatic effort to assist federal agencies in taking action and changing their institutions to achieve and maintain federal sustainability goals, while meeting their mission goals. FEMP is developing guidance for federal agency efforts to enable institutional behavior change for sustainability, and for making sustainability “business as usual.” The driving requirement for this change is Executive Order (EO) 13514, Federal Leadership in Environmental, Energy, and Economic Performance. FEMP emphasizes strategies for increasing energy efficiency and renewable energy utilization as critical components of attaining sustainability, and promotes additional non-energy action pathways contained in EO 13514.more » This report contributes to the larger goal by laying out the conceptual and evidentiary underpinnings of guidance to federal agencies. Conceptual frameworks focus and organize the development of guidance. We outline a series of progressively refined conceptual frameworks, including a multi-layer approach, key steps in sustainability implementation, a process view of specific approaches to institutional change, the agency Strategic Sustainability Performance Plans (SSPPs), and concepts related to context-specific rules, roles and tools for sustainability. Additionally, we tap pertinent bodies of literature in drawing eight evidence-based principles for behavior change. These principles are important foundations upon which to build in selecting strategies to effect change in organizations. Taken together, this report presents a suite of components that inform the training materials, presentations, web site, and other products that provide guidance to federal agencies.« less

  3. Characterization of the treefrog null allele, 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guttman, S.I.

    1992-04-01

    Spring peeper (Hyla crucifer) tadpoles collected from the waste storage area during the Biological and Ecological Site Characterization of the Feed Materials Production Center (FEMP) in 1986 and 1987 appeared to be unique. A null (inactive) allele was found at the glucose phosphate isomerase enzyme locus in significant frequencies (approximately 20%) each year; this allele did not appear to occur in the offsite sample collected approximately 15km from the FEMP. Null alleles at this locus have not been reported in other amphibian populations; when they have been found in other organisms they have invariably been lethal in the homozygous condition.

  4. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Interim report, 1994 Summer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Winiarski, D.W.

    1995-01-01

    The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studiedmore » under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heeter, Jenny

    This FEMP First Thursday presentation will explain the concept of a utility green tariff, how it differs from a green pricing program, and what questions federal agencies should have about participating.

  6. 48 CFR 23.103 - Sustainable acquisitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL... the products are— (1) Energy-efficient (ENERGY STAR ® or Federal Energy Management Program (FEMP...

  7. 48 CFR 23.103 - Sustainable acquisitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL... the products are— (1) Energy-efficient (ENERGY STAR ® or Federal Energy Management Program (FEMP...

  8. Guidelines for Datacenter Energy Information System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singh, Reshma; Mahdavi, Rod; Mathew, Paul

    2013-12-01

    The purpose of this document is to provide structured guidance to data center owners, operators, and designers, to empower them with information on how to specify and procure data center energy information systems (EIS) for managing the energy utilization of their data centers. Data centers are typically energy-intensive facilities that can consume up to 100 times more energy per unit area than a standard office building (FEMP 2013). This guidance facilitates “data-driven decision making,” which will be enabled by following the approach outlined in the guide. This will bring speed, clarity, and objectivity to any energy or asset management decisionsmore » because of the ability to monitor and track an energy management project’s performance.« less

  9. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Winiarski, D.W.

    1995-12-01

    The Federal government is the largest single energy consumer in the United States with consumption of nearly 1.5 quads/year of energy (10{sup 15} quad = 1015 Btu) and cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the Federal sector. One such effort, the New Technology Demonstration Program (NTDP) seeks to evaluate new energy -- saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate inmore » the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studied under that program. This report provides the results of a field evaluation that PNL conducted for DOE/FEMP with funding support from the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of 4 candidate energy-saving technology-a water heater conversion system to convert electrically powered water heaters to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.« less

  10. 10 CFR 436.41 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... product that is of a category for which an ENERGY STAR qualification or FEMP designation is established. ENERGY STAR qualified product means a product that is rated for energy efficiency under an ENERGY STAR...

  11. 10 CFR 436.41 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... product that is of a category for which an ENERGY STAR qualification or FEMP designation is established. ENERGY STAR qualified product means a product that is rated for energy efficiency under an ENERGY STAR...

  12. 10 CFR 436.41 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... product that is of a category for which an ENERGY STAR qualification or FEMP designation is established. ENERGY STAR qualified product means a product that is rated for energy efficiency under an ENERGY STAR...

  13. 10 CFR 436.41 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... product that is of a category for which an ENERGY STAR qualification or FEMP designation is established. ENERGY STAR qualified product means a product that is rated for energy efficiency under an ENERGY STAR...

  14. 10 CFR 436.41 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... product that is of a category for which an ENERGY STAR qualification or FEMP designation is established. ENERGY STAR qualified product means a product that is rated for energy efficiency under an ENERGY STAR...

  15. Federal Energy Management Program Overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Brochure offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

  16. Utility Energy Services Contracts: Enabling Documents, May 2009 (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2009-05-01

    Enabling Documents, delivered by the U.S. Department of Energy's Federal Energy Management Program (FEMP) to provide materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs).

  17. Facilitating Sound, Cost-Effective Federal Energy Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FEMP

    2016-07-01

    Fact sheet offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

  18. 48 CFR 23.103 - Sustainable acquisitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition Policy 23.103 Sustainable acquisitions. (a... the products are— (1) Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP...

  19. 48 CFR 23.103 - Sustainable acquisitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition Policy 23.103 Sustainable acquisitions. (a... the products are— (1) Energy-efficient (ENERGY STAR ® or Federal Energy Management Program (FEMP...

  20. LED Provides Effective and Efficient Parking Area Lighting at the NAVFAC Engineering Service Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2010-08-12

    U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) emerging technology case study showcasing LED lighting to improve energy efficiency in parking areas at the NAVFAC Engineering Services Center.

  1. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  2. Metering Best Practices, A Guide to Achieving Utility Resource Efficiency, Release 2.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, Greg; Hunt, W. D.; Pugh, Ray

    2011-08-31

    This release is an update and expansion of the information provided in Release 1.0 of the Metering Best Practice Guide that was issued in October 2007. This release, as was the previous release, was developed under the direction of the U.S. Department of Energy's Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government's implementation of sound cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. Each of these activities is directly related to achieving requirements set forth in the Energy Policy Acts of 1992 and 2005, the Energymore » Independence and Security Act (EISA) of 2007, and the goals that have been established in Executive Orders 13423 and 13514 - and also those practices that are inherent in sound management of Federal financial and personnel resources.« less

  3. Ecological risks of DOE`s programmatic environmental restoration alternatives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-06-01

    This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representativemore » facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.« less

  4. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...

  5. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...

  6. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...

  7. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...

  8. 48 CFR 23.204 - Procurement exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...

  9. 10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...

  10. 10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...

  11. 10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...

  12. Fleet Management | Climate Neutral Research Campuses | NREL

    Science.gov Websites

    Fleet Management Fleet Management Research campuses often own and operate vehicles to carry out Sample Project Related Links Fleet Management Options The goal of fleet management within climate action alternative fuel use. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) outlines

  13. 77 FR 42500 - Designation of a Class of Employees for Addition to the Special Exposure Cohort; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Special Exposure Cohort; Correction AGENCY: National Institute for Occupational Safety and Health (NIOSH... Production Center (FMPC) in Fernald, Ohio, also known as the Fernald Environmental Management Project (FEMP), as an addition to the Special Exposure Cohort (SEC) under the Energy Employees Occupational Illness...

  14. 75 FR 39678 - Meeting of Energy Services Companies and the Federal Energy Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... DEPARTMENT OF ENERGY Meeting of Energy Services Companies and the Federal Energy Management... Management Program (FEMP) within the Office of Energy Efficiency and Renewable Energy on the use of high-end... conducted in an informal, conference style. Each participant will be allowed to make a prepared general...

  15. 10 CFR 436.42 - Evaluation of Life-Cycle Cost Effectiveness.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Evaluation of Life-Cycle Cost Effectiveness. 436.42... PROGRAMS Agency Procurement of Energy Efficient Products § 436.42 Evaluation of Life-Cycle Cost...) ENERGY STAR qualified and FEMP designated products may be assumed to be life-cycle cost-effective. (b) In...

  16. 48 CFR 52.213-4 - Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items)

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP) will be... exceeds the micro-purchase threshold and the acquisition— (A) Is set aside for small business concerns; or (B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000.) (x...

  17. Fort Stewart integrated resource assessment. Volume 1, Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, L.L.; Keller, J.M.

    1993-10-01

    The US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), has developed a model program that provides a systematic approach to evaluating energy opportunities that (1) identifies the building groups and end uses that use the most energy (not just have the greatest energy-use intensity), and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. In essence, this model program provides the federal energy manager with a roadmap to significantly reduce energy use in a planned, rational, cost-effectivemore » fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a five- to ten-year energy management plan that identifies where to start and how to proceed in order to reach the mandated energy consumption targets. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the US Army US Forces Command (FORSCOM) Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 2, Baseline Detail, and Volume 3, Resource Assessment.« less

  18. Rainwater harvesting state regulations and technical resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loper, Susan A.

    Pacific Northwest National Laboratory (PNNL) conducted in-depth research of state-level rainwater harvesting regulations for the Federal Energy Management Program (FEMP) to help federal agencies strategically identify locations conducive to rainwater harvesting projects. Currently, rainwater harvesting is not regulated by the federal government but rather it is up to individual states to regulate the collection and use of rainwater. There is no centralized information on state-level regulations on rainwater harvesting maintained by a federal agency or outside organization. To fill this information gap, PNNL performed detailed internet searches for each state, which included state agencies, universities, Cooperative Extension Offices, city governments,more » and related organizations. The state-by-state information on rainwater harvesting regulations was compiled and assembled into an interactive map that is color coded by state regulations. The map provides a visual representation of the general types of rainwater harvesting policies across the country as well as general information on the state programs if applicable. The map allows the user to quickly discern where rainwater harvesting is supported and regulated by the state. This map will be available on the FEMP website by September 2015.« less

  19. Shielding Analysis of a Small Compact Space Nuclear Reactor

    DTIC Science & Technology

    1987-08-01

    RESPONSE) =4, MAXWELLIAN FISSION SPECTRUM (ILNTEGRAL RESPONSE) =5, LOS ALAMOS FISSION SPECTRUM, 1982 (INTEGRAL RESPONSE) =6, VITAMIN C NEUTRON SPECTRUM...Appendices Appendix A: Calculations of Effective Radii.. A-1 Appendix B: Atom Density Calculations for FEMPlD and FEMP2D ................ B-I Appendix C ...FEMPID and FEM22D Data........... C -i Appendix D: Energy Group Definition .......... D-I Appendix E: Transport Equation, Legendr4 Polynomial

  20. Building Energy Audit Report, for Hickam AFB, HI

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chvala, William D.; De La Rosa, Marcus I.; Brown, Daryl R.

    2010-09-30

    A building energy assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Department of Energy/Federal Energy Management program (FEMP). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at Hickam AFB, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings. This documents reports the results of that assessment.

  1. Building Energy Audit Report for Camp Smith, HI

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chvala, William D.; De La Rosa, Marcus I.; Brown, Daryl R.

    2010-09-30

    A detailed energy assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Department of Energy/Federal Energy Management program (FEMP). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at Camp Smith, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings. This report documents the results of that assessment.

  2. Central Plant Optimization for Waste Energy Reduction (CPOWER). ESTCP Cost and Performance Report

    DTIC Science & Technology

    2016-12-01

    in the regression models. The solar radiation data did not appear reliable in the weather dataset for the location, and hence it was not used. The...and additional factors (e.g., solar insolation) may be needed to obtain a better model. 2. Inputs to optimizer: During several periods of...Location: North Carolina Energy Consumption Cost Savings $ 443,698.00 Analysis Type: FEMP PV of total savings 215,698.00$ Base Date: April 1

  3. Contracting for Efficiency. A Best Practices Guide for Energy-Efficient Product Procurement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bunch, Saralyn; Payne, Christopher

    2016-04-01

    The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.

  4. Contracting for Efficiency: A Best Practices Guide for Energy Efficient Product Procurement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bunch, Saralyn; Payne, Christopher

    The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.

  5. ARRA FEMP Technical Assistance -- Federal Aviation Administration Project 209 -- Control Tower and Support Building, Palm Springs, CA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  6. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration Project 209 - Control Tower and Support Building, Las Vegas, NV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  7. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building Oakland, CA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-03-01

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brigantic, Robert T.; Papatyi, Anthony F.; Perkins, Casey J.

    This report summarizes a study and corresponding model development conducted in support of the United States Pacific Command (USPACOM) as part of the Federal Energy Management Program (FEMP) American Reinvestment and Recovery Act (ARRA). This research was aimed at developing a mathematical programming framework and accompanying optimization methodology in order to simultaneously evaluate energy efficiency (EE) and renewable energy (RE) opportunities. Once developed, this research then demonstrated this methodology at a USPACOM installation - Camp H.M. Smith, Hawaii. We believe this is the first time such an integrated, joint EE and RE optimization methodology has been constructed and demonstrated.

  9. Consumer Electronics Testing to Fast-Rise EMP (Electromagnetic Pulse) (VEMPS (Vertical Electromagnetic Pulse Simulator) 2 Development)

    DTIC Science & Technology

    1989-06-01

    Fast-Rise EMP ( VEMPS 11 Development) 12. PERSONAL AUTHOR(S) Vincent J. Ellis 13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year Mot.Dy...SUBJECT TERMS (Continue on reverse if necessary andJ identity by block nwitib") 09EL 03U SBGR EMP, VEMPS 11, consumer electronics, FEMPS, EMP simulation... VEMPS 11), Because of the unique petrr! ance characteristics of VEMPS 11 and the technological changes In consumer electronics over the past 10 years

  10. Characterization of Fernald Silo 3 Waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Langton, C.A.

    This report summarizes characterization results for uranium residues from the Fernald Environmental Management Project (FEMP) Operable Unit (OU-4). These residues are currently stored in a one-million-gallon concrete silo, Silo 3, at the DOE Fernald Site, Ohio. Characterization of the Silo 3 waste is the first part of a three part study requested by Rocky Mountain Remedial Services (RMRS) through a Work for others Agreement, WFO-00-007, between the Westinghouse Savannah River Company (WSRC) and RMRS. Parts 2 and 3 of this effort include bench- and pilot-scale testing.

  11. 40 CFR 74.61 - Monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDermott, Christa; Malone, Elizabeth L.

    This report assesses the use of institutional change principles and the institutional impact of award-winning projects through interviews with 22 Department of Energy Federal Energy Management Program (DOE FEMP) award winners. Award winners identified institutional facilitators and barriers in their projects and programs as well as factors in their implementation processes, thus providing information that can guide other efforts. We found that award winners do use strategies based on eight principles of institutional change, most frequently in terms of making changes to infrastructure, engaging leadership, and capitalizing on multiple motivations for making an energy efficiency improvement. The principles drawn onmore » the least often were commitment and social empowerment. Award winners also faced five major types of obstacles that were institutional in nature: lack of resources, constraints of rules, psychological barriers, lack of information, and communication problems. We also used the seven categories of Energy Management Excellence (EME) as a lens to interpret the interview data and assess whether these categories relate to established institutional change principles. We found that the eight principles reflect strategies that have been found to be useful in improving energy efficiency in organizations, whereas the EME categories capture more of a blend of social contextual factors and strategies. The EME categories fill in some of the social context gaps that facilitate institutional change and energy management excellence, for example, personal persistence, a culture that supports creativity and innovation, regular engagement with tenants, contractors, and staff at all levels. Taking together the use of principles, EME criteria, and obstacles faced by interviewees, we make recommendations for how FEMP can better foster institutional change in federal agencies.« less

  13. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-06-30

    Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  14. 40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...

  15. Planning Skills and Negotiator Goal Accomplishment: The Relationship between Self-Monitoring and Plan Generation, Plan Enactment, and Plan Consequences.

    ERIC Educational Resources Information Center

    Jordan, Jerry Monroe; Roloff, Michael E.

    1997-01-01

    Focuses on skills necessary for effective negotiation planning. Argues that the information processing tendencies of high self-monitors make them adept at negotiation planning. Extends existing work by relating self-monitoring to plan generation, enactment, and consequences. Indicates that self-monitoring is related to prenegotiation goal…

  16. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less

  17. American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-06-28

    This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

  18. 6. Monitoring and the Northwest Forest Plan

    Treesearch

    Leslie M. Reid

    1994-01-01

    Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...

  19. 40 CFR 141.601 - Standard monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Standard monitoring. 141.601 Section... Standard monitoring. (a) Standard monitoring plan. Your standard monitoring plan must comply with paragraphs (a)(1) through (a)(4) of this section. You must prepare and submit your standard monitoring plan...

  20. 40 CFR 75.62 - Monitoring plan submittals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... representative for an affected unit shall submit a complete, electronic, up-to-date monitoring plan file (except... quarterly report for a reporting quarter where an update of the electronic monitoring plan information is... associated, pursuant to § 75.53(b). Electronic submittal of all monitoring plan information, including...

  1. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007more » investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.« less

  2. 36 CFR 219.11 - Monitoring and evaluation for adaptive management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sustainability in the plan area (§§ 219.19 through 219.21). The strategy must require monitoring of appropriate plan decisions and characteristics of sustainability. (1) Monitoring and evaluation of ecological sustainability. The plan monitoring strategy for the monitoring and evaluation of ecological sustainability must...

  3. Authorized limits for Fernald copper ingots

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frink, N.; Kamboj, S.; Hensley, J.

    This development document contains data and analysis to support the approval of authorized limits for the unrestricted release of 59 t of copper ingots containing residual radioactive material from the U.S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP). The analysis presented in this document comply with the requirements of DOE Order 5400.5, {open_quotes}Radiation Protection of the Public and the Environment,{close_quotes} as well as the requirements of the proposed promulgation of this order as 10 CFR Part 834. The document was developed following the step-by-step process described in the Draft Handbook for Controlling Release for Reuse or Recycle Propertymore » Containing Residual Radioactive Material.« less

  4. Whole Building Cost and Performance Measurement: Data Collection Protocol Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, Kimberly M.; Spees, Kathleen L.; Kora, Angela R.

    2009-03-27

    This protocol was written for the Department of Energy’s Federal Energy Management Program (FEMP) to be used by the public as a tool for assessing building cost and performance measurement. The primary audiences are sustainable design professionals, asset owners, building managers, and research professionals within the Federal sector. The protocol was developed based on the need for measured performance and cost data on sustainable design projects. Historically there has not been a significant driver in the public or private sector to quantify whole building performance in comparable terms. The deployment of sustainable design into the building sector has initiated manymore » questions on the performance and operational cost of these buildings.« less

  5. An effectiveness monitoring program for the northwest forest plan: new approaches to common monitoring problems

    Treesearch

    Craig Palmer; Barry Mulder; Barry Noon

    2000-01-01

    The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...

  6. Environmental monitoring plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holland, R.C.

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  7. 50 CFR 216.275 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...

  8. Ranch business planning and resource monitoring for rangeland sustainability

    Treesearch

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  9. A methodology to develop computational phantoms with adjustable posture for WBC calibration

    NASA Astrophysics Data System (ADS)

    Ferreira Fonseca, T. C.; Bogaerts, R.; Hunt, John; Vanhavere, F.

    2014-11-01

    A Whole Body Counter (WBC) is a facility to routinely assess the internal contamination of exposed workers, especially in the case of radiation release accidents. The calibration of the counting device is usually done by using anthropomorphic physical phantoms representing the human body. Due to such a challenge of constructing representative physical phantoms a virtual calibration has been introduced. The use of computational phantoms and the Monte Carlo method to simulate radiation transport have been demonstrated to be a worthy alternative. In this study we introduce a methodology developed for the creation of realistic computational voxel phantoms with adjustable posture for WBC calibration. The methodology makes use of different software packages to enable the creation and modification of computational voxel phantoms. This allows voxel phantoms to be developed on demand for the calibration of different WBC configurations. This in turn helps to study the major source of uncertainty associated with the in vivo measurement routine which is the difference between the calibration phantoms and the real persons being counted. The use of realistic computational phantoms also helps the optimization of the counting measurement. Open source codes such as MakeHuman and Blender software packages have been used for the creation and modelling of 3D humanoid characters based on polygonal mesh surfaces. Also, a home-made software was developed whose goal is to convert the binary 3D voxel grid into a MCNPX input file. This paper summarizes the development of a library of phantoms of the human body that uses two basic phantoms called MaMP and FeMP (Male and Female Mesh Phantoms) to create a set of male and female phantoms that vary both in height and in weight. Two sets of MaMP and FeMP phantoms were developed and used for efficiency calibration of two different WBC set-ups: the Doel NPP WBC laboratory and AGM laboratory of SCK-CEN in Mol, Belgium.

  10. A methodology to develop computational phantoms with adjustable posture for WBC calibration.

    PubMed

    Fonseca, T C Ferreira; Bogaerts, R; Hunt, John; Vanhavere, F

    2014-11-21

    A Whole Body Counter (WBC) is a facility to routinely assess the internal contamination of exposed workers, especially in the case of radiation release accidents. The calibration of the counting device is usually done by using anthropomorphic physical phantoms representing the human body. Due to such a challenge of constructing representative physical phantoms a virtual calibration has been introduced. The use of computational phantoms and the Monte Carlo method to simulate radiation transport have been demonstrated to be a worthy alternative. In this study we introduce a methodology developed for the creation of realistic computational voxel phantoms with adjustable posture for WBC calibration. The methodology makes use of different software packages to enable the creation and modification of computational voxel phantoms. This allows voxel phantoms to be developed on demand for the calibration of different WBC configurations. This in turn helps to study the major source of uncertainty associated with the in vivo measurement routine which is the difference between the calibration phantoms and the real persons being counted. The use of realistic computational phantoms also helps the optimization of the counting measurement. Open source codes such as MakeHuman and Blender software packages have been used for the creation and modelling of 3D humanoid characters based on polygonal mesh surfaces. Also, a home-made software was developed whose goal is to convert the binary 3D voxel grid into a MCNPX input file. This paper summarizes the development of a library of phantoms of the human body that uses two basic phantoms called MaMP and FeMP (Male and Female Mesh Phantoms) to create a set of male and female phantoms that vary both in height and in weight. Two sets of MaMP and FeMP phantoms were developed and used for efficiency calibration of two different WBC set-ups: the Doel NPP WBC laboratory and AGM laboratory of SCK-CEN in Mol, Belgium.

  11. Public sector energy management: A strategy for catalyzing energy efficiency in Malaysia

    NASA Astrophysics Data System (ADS)

    Roy, Anish Kumar

    To date the public sector role in facilitating the transition to a sustainable energy future has been envisaged mainly from a regulatory perspective. In such a role, the public sector provides the push factors---enforcing regulations and providing incentives---to correct market imperfections that impede energy transitions. An alternative and complementary role of the public sector that is now gaining increasing attention is that of catalyzing energy transitions through public sector energy management initiatives. This dissertation offers a conceptual framework to rationalize such a role for the public sector by combining recent theories of sustainable energy transition and public management. In particular, the framework identifies innovative public management strategies (such as performance contracting and procurement) for effectively implementing sustainable energy projects in government facilities. The dissertation evaluates a model of sustainable public sector energy management for promoting energy efficiency in Malaysia. The public sector in Malaysia can be a major player in leading and catalyzing energy efficiency efforts as it is not only the largest and one of the most influential energy consumers, but it also plays a central role in setting national development strategy. The dissertation makes several recommendations on how a public sector energy management strategy can be implemented in Malaysia. The US Federal Energy Management Program (FEMP) is used as a practical model. The analysis, however, shows that in applying the FEMP model to the Malaysian context, there are a number of limitations that will have to be taken into consideration to enable a public sector energy management strategy to be effectively implemented. Overall the analysis of this dissertation contributes to a rethinking of the public sector role in sustainable energy development that can strengthen the sector's credibility both in terms of governance and institutional performance. In addition, it links theory with practice by offering a strategy that can effectively address critical issues arising from the energy-development-policy nexus of the sustainable energy development debate.

  12. An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West

    USGS Publications Warehouse

    Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.

    2011-01-01

    Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.

  13. 40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring system...) Written procedures for continuous monitoring systems Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance evaluation Yes...

  14. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  15. Incorporating genetic sampling in long-term monitoring and adaptive management in the San Diego County Management Strategic Plan Area, Southern California

    USGS Publications Warehouse

    Vandergast, Amy G.

    2017-06-02

    Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.

  16. Putting Adaptive Management into Monitoring: Retrospective and Prospective Views of Northwest Forest Plan Monitoring

    Treesearch

    David E. Busch; Jon R. Martin

    2006-01-01

    Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...

  17. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiencymore » of the building.« less

  18. Region 7 States Air Quality Monitoring Plans - Iowa

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  19. Region 7 States Air Quality Monitoring Plans - Missouri

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  20. Region 7 States Air Quality Monitoring Plans - Nebraska

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  1. Region 7 States Air Quality Monitoring Plans - Kansas

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  2. 50 CFR 216.175 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...

  3. U.S. Geological Survey quality-assurance plan for continuous water-quality monitoring in Kansas, 2014

    USGS Publications Warehouse

    Bennett, Trudy J.; Graham, Jennifer L.; Foster, Guy M.; Stone, Mandy L.; Juracek, Kyle E.; Rasmussen, Teresa J.; Putnam, James E.

    2014-01-01

    A quality-assurance plan for use in conducting continuous water-quality monitoring activities has been developed for the Kansas Water Science Center in accordance with guidelines set forth by the U.S. Geological Survey. This quality-assurance plan documents the standards, policies, and procedures used by the U.S. Geological Survey in Kansas for activities related to the collection, processing, storage, analysis, and release of continuous water-quality monitoring data. The policies and procedures that are documented in this quality-assurance plan for continuous water-quality monitoring activities complement quality-assurance plans for surface-water and groundwater activities in Kansas.

  4. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  5. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  6. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  7. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  8. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  9. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...

  10. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...

  11. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  12. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  13. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  14. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  15. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  16. Alberta Biodiversity Monitoring Program - monitoring effectiveness of sustainable forest management planning

    Treesearch

    J. John Stadt; Jim Schieck; Harry Stelfox

    2006-01-01

    The Alberta Biodiversity Monitoring Program is a rigorous science-based initiative that is being developed to monitor and report on biodiversity status and trends throughout the province of Alberta, Canada. Forest management plans in Alberta are required to monitor and report on the achievement of stated sustainable forest management objectives; however, the...

  17. A Planning Approach for Developing Inventory and Monitoring Programs In National Parks

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...

  18. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the...'s reports. Each sales or rental report shall be reviewed by the monitoring office as it is received. When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or...

  19. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  20. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  1. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  2. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  3. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  4. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration – Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency ofmore » the building.« less

  5. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  6. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  7. 40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to develop SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring... to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance...)(iv), (b)(2)(v) Actions taken to minimize emissions during SSM No. § 63.10(b)(2)(vi) Recordkeeping for...

  8. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Treesearch

    Jonathan Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  9. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  10. Preparation of regional shorebird monitoring plans

    Treesearch

    Jonathan Bart; Ann Manning; Susan Thomas; Catherine Wightman

    2005-01-01

    Shorebird monitoring programs in Canada and the United States are being developed under the auspices of PRISM, the Program for Regional and International Shorebird Monitoring. PRISM provides a single blueprint for implementing the monitoring proposals in the shorebird conservation plans prepared recently in Canada and the United States. It includes four segments:...

  11. Designing monitoring programs in an adaptive management context for regional multiple species conservation plans

    USGS Publications Warehouse

    Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.

    2004-01-01

    critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.

  12. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  13. 40 CFR 63.2987 - What must my operation, maintenance, and monitoring (OMM) plan include?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintenance, and monitoring (OMM) plan include? (a) You must prescribe the monitoring that will be performed...) For the burn cycle that follows the inspection, document that the thermal oxidizer is operating...

  14. Circumpolar biodiversity monitoring program (CBMP): Coastal expert workshop meeting report

    USGS Publications Warehouse

    Anderson, Rebecca D.; McLennan, Donald; Thomson, Laura; Wegeberg, Susse; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, Stacey; Christensen, Thomas K.; Price, Courtney

    2016-01-01

    The Coastal Expert Workshop, which took place in Ottawa, Canada from March 1 to 3, 2016, initiated the development of the Arctic Coastal Biodiversity Monitoring Plan (Coastal Plan). Meeting participants, including northern residents, representatives from industry, non-governmental organisations (NGOs), academia, and government regulators and agencies from across the circumpolar Arctic, discussed current biodiversity monitoring efforts, key issues facing biodiversity in Arctic coastal areas, and collectively identified monitoring indicators, or Focal Ecosystem Components (FECs). On February 29, the day before the workshop, a full day was allocated to Traditional Knowledge (TK) holders to meet and elucidate how this important knowledge can be included in the process of building the Coastal Plan and monitoring biodiversity in Arctic coastal areas, along with scientific data and variables. This document provides 1) background information about the Circumpolar Biodiversity Monitoring Programme and the Coastal Expert Monitoring Group, 2) overviews on workshop presentations and breakout sessions, and 3) details regarding outcomes of the workshop that will inform the drafting of the Coastal Plan.

  15. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less

  16. Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper

    USGS Publications Warehouse

    McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.

    2016-01-01

    In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.

  17. The GMES Sentinel-5 mission for operational atmospheric monitoring: status and developments

    NASA Astrophysics Data System (ADS)

    Sierk, Bernd; Bezy, Jean-Loup; Caron, Jerôme; Meynard, Roland; Veihelmann, Ben; Ingmann, Paul

    2017-11-01

    Sentinel-5 is an atmospheric monitoring mission planned in the frame of the joint EU/ESA initiative Global Monitoring for Environment and Security (GMES). The objective of the mission, planned to be launched in 2020, is the operational monitoring of trace gas concentrations for atmospheric chemistry and climate applications.

  18. Chapter 3. Planning and design for habitat monitoring

    Treesearch

    Christina D. Vojta; Lyman L. McDonald; C. Kenneth Brewer; Kevin S. McKelvey; Mary M Rowland; Michael I. Goldstein

    2013-01-01

    This chapter provides guidance for designing a habitat monitoring program so that it will meet the monitoring objective, will be repeatable, and will adequately represent habitat within the spatial extent of interest. Although a number of excellent resources are available for planning and designing a monitoring program for wildlife populations (e.g., Busch and Trexler...

  19. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.

  20. 40 CFR 60.4355 - How do I establish and document a proper parameter monitoring plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards of Performance for Stationary Combustion Turbines Monitoring § 60.4355 How do I establish and document a proper parameter monitoring plan? (a) The steam or water to fuel ratio or other parameters that...

  1. Late-successional forests and northern spotted owls: how effective is the Northwest Forest Plan?

    Treesearch

    Miles Hemstrom; Martin G. Raphael

    2000-01-01

    This paper describes the late-successional and old-growth forest and the northern spotted owl effectiveness monitoring plans for the Northwest Forest Plan. The effectiveness monitoring plan for late-successional and old-growth forests will track changes in forest spatial distribution, and within-stand structure and composition, and it will predict future trends.

  2. 78 FR 13712 - U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Monitoring Activities for F-Area Tank Farm at the Savannah River Site, Revision 0 AGENCY: Nuclear Regulatory... carrying out its responsibilities for monitoring DOE's waste disposal activities at the F-Area Tank Farm at... the availability of ``U.S. Nuclear Regulatory Commission Plan for Monitoring Disposal Actions Taken by...

  3. Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface Water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-10-01

    The Y-12 Plant conducts a surface water monitoring program in response to DOE Orders and state of Tennessee requirements under the National Pollutant Discharge Elimination System (NPDES). The anticipated codification of DOE Order 5400.5 for radiation protection of the public and the environment (10 CFR Part 834) will require an environmental radiation protection plan (ERPP). The NPDES permit issued by the state of Tennessee requires a radiological monitoring plan (RMP) for Y-12 Plant surface waters. In a May 4, 1995 memo, the state of Tennessee, Division of Water Pollution Control, stated their desired needs and goals regarding the content ofmore » RMPs, associated documentation, and data resulting from the RMPs required under the NPDES permitting system (L. Bunting, General Discussion, Radiological Monitoring Plans, Tennessee Division of Water Pollution Control, May 4,1995). Appendix A provides an overview of how the Y-12 Plant will begin to address these needs and goals. It provides a more complete, documented basis for the current Y-12 Plant surface water monitoring program and is intended to supplement documentation provided in the Annual Site Environmental Reports (ASERs), NPDES reports, Groundwater Quality Assessment Reports, and studies conducted under the Y-12 Plant Environmental Restoration (ER) Program. The purpose of this update to the Y-12 Plant RMP is to satisfy the requirements of the current NPDES permit, DOE Order 5400.5, and 10 CFR Part 834, as current proposed, by defining the radiological monitoring plan for surface water for the Y-12 Plant. This plan includes initial storm water monitoring and data analysis. Related activities such as sanitary sewer and sediment monitoring are also summarized. The plan discusses monitoring goals necessary to determine background concentrations of radionuclides, to quantify releases, determine trends, satisfy regulatory requirements, support consequence assessments, and meet requirements that releases be ``as low as reasonably achievable`` (ALARA).« less

  4. Reverse Osmosis Optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McMordie Stoughton, Kate; Duan, Xiaoli; Wendel, Emily M.

    This technology evaluation was prepared by Pacific Northwest National Laboratory on behalf of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). ¬The technology evaluation assesses techniques for optimizing reverse osmosis (RO) systems to increase RO system performance and water efficiency. This evaluation provides a general description of RO systems, the influence of RO systems on water use, and key areas where RO systems can be optimized to reduce water and energy consumption. The evaluation is intended to help facility managers at Federal sites understand the basic concepts of the RO process and system optimization options, enabling them tomore » make informed decisions during the system design process for either new projects or recommissioning of existing equipment. This evaluation is focused on commercial-sized RO systems generally treating more than 80 gallons per hour.¬« less

  5. Reverse Osmosis Optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This technology evaluation was prepared by Pacific Northwest National Laboratory on behalf of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The technology evaluation assesses techniques for optimizing reverse osmosis (RO) systems to increase RO system performance and water efficiency. This evaluation provides a general description of RO systems, the influence of RO systems on water use, and key areas where RO systems can be optimized to reduce water and energy consumption. The evaluation is intended to help facility managers at Federal sites understand the basic concepts of the RO process and system optimization options, enabling them tomore » make informed decisions during the system design process for either new projects or recommissioning of existing equipment. This evaluation is focused on commercial-sized RO systems generally treating more than 80 gallons per hour.« less

  6. Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan

    DTIC Science & Technology

    1993-10-01

    5 Table 4-2. US EPA Drinking Water MCLs ........................................ 4-6 Table 5-1. Sample Bottle Requirements, Preservation, and Holding... drinking water . " The types of quality control samples that will be collected during the Canal Creek groundwater monitoring program. ]- Jacobs...Revision No.: 0 Date: 10/27/93 Page: 6 of 9 Canal Creek Area, APG-EA, Maryland Groundwater Monitoring Plan, VOLUME I1 Table 4-2. US EPA Drinking Water

  7. Effectiveness monitoring for the aquatic and riparian component of the Northwest Forest Plan: conceptual framework and options.

    Treesearch

    Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael Tehan

    2004-01-01

    An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...

  8. Northwest Forest Plan—the first 10 years (1994-2003): status and trends of populations and nesting habitat for the marbled murrelet.

    Treesearch

    Mark H. Huff; Martin G. Raphael; Sherri L. Miller; S. Kim Nelson; Jim Baldwin

    2006-01-01

    The Northwest Forest Plan (the Plan) is a large-scale ecosystem management plan for federal land in the Pacific Northwest. Marbled murrelet (Brachyramphus marmoratus) populations and habitat were monitored to evaluate effectiveness of the Plan. The chapters in this volume summarize information on marbled murrelet ecology and present the monitoring...

  9. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  10. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  11. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  12. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  13. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  14. 78 FR 63962 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...: Scientific research, monitoring or habitat restoration exceptions, state and individual research plans... research, scientific monitoring, and fisheries activities conducted under an approved 4(d) program or plan..., 5 or 20 hours, depending on the research or plan. Burden Hours: 1,760. Needs and Uses: This request...

  15. Active transportation monitoring plan : initial evaluation of bicycling and walking baseline & planned traffic counts through 2015.

    DOT National Transportation Integrated Search

    2011-09-06

    Active Transportation in the form of bicycle and pedestrian traffic, is monitored for the Austin-Round Rock-San Marcos, TX region by the Capital Area Metropolitan Planning Organization using a variety of methods: automatic, manual and surveyed. This ...

  16. Test/QA Plan (TQAP) for Verification of Semi-Continuous Ambient Air Monitoring Systems

    EPA Science Inventory

    The purpose of the semi-continuous ambient air monitoring technology (or MARGA) test and quality assurance plan is to specify procedures for a verification test applicable to commercial semi-continuous ambient air monitoring technologies. The purpose of the verification test is ...

  17. 24 CFR 91.330 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.330 Section 91.330 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Consolidated Plan § 91.330 Monitoring. The consolidated plan must describe the standards and procedures that...

  18. 24 CFR 91.430 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.430 Section 91.430 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Plan § 91.430 Monitoring. The consolidated plan must describe the standards and procedures that the...

  19. SU-E-T-110: An Investigation On Monitor Unit Threshold and Effects On IMPT Delivery in Proton Pencil Beam Planning System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Syh, J; Ding, X; Syh, J

    2015-06-15

    Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization,more » specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study.« less

  20. 36 CFR 219.30 - Plan documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated... years; and a display of the budget trends over at least the past 5 years. (e) Other components. A plan...

  1. Bioassessment Tools for Stony Corals: Monitoring Approaches and Proposed Sampling Plan for the U.S. Virgin Islands

    EPA Science Inventory

    This document describes three general approaches to the design of a sampling plan for biological monitoring of coral reefs. Status assessment, trend detection and targeted monitoring each require a different approach to site selection and statistical analysis. For status assessm...

  2. 40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...

  3. 40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...

  4. 77 FR 40860 - Strategic Plan for Federal Research and Monitoring of Ocean Acidification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... Plan for Federal Research and Monitoring of Ocean Acidification AGENCY: National Marine Fisheries... Federal Research and Monitoring of Ocean Acidification is being made available for public review and... understanding of the process of ocean acidification, its effects on marine ecosystems, and the steps that could...

  5. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1995-09-05

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  6. Developing and Monitoring Individual Education Plans for Handicapped Children.

    ERIC Educational Resources Information Center

    Armstrong, Mary Lee

    The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…

  7. Hydrologic data and description of a hydrologic monitoring plan for the Borax Lake area, Oregon

    USGS Publications Warehouse

    Schneider, Tiffany Rae; McFarland, William D.

    1995-01-01

    Information from field visits was used to develop a monitoring plan. The plan would include monitoring Borax Lake by measuring discharge, stage, evaporation, temperature, and specific conductance; water-quality sampling and analysis; and monitoring shallow ground-water levels near Borax Lake using shallow piezometers. Minimally, one hot spring in North Borax Lake Spring Group 1 would be monitored for temperature and specific conductance and sampled for water-quality analysis. In addition, two flowing wells would be monitored for water levels, temperature, specific conductance, and discharge and sampled for water-quality analysis. The construction characteristics of these wells must be verified before long-term data collection begins. In the future, it may be helpful to monitor shallow and (or) deep observation wells drilled into the thermal aquifer to understand the possible effects of geothermal development on Borax Lake and nearby springs.

  8. Late-successional and old-growth forest effectiveness monitoring plan for the Northwest Forest Plan.

    Treesearch

    Miles Hemstrom; Thomas Spies; Craig Palmer; Ross Kiester; John Teply; Phil McDonald; Ralph. Warbington

    1998-01-01

    This report presents options for long-term effectiveness monitoring of late-successional and old-growth forests under the Northwest Forest Plan. It describes methods to answer questions about how much late-successional forest exists on Federal land, its pattern, how it’s changing, and if the Forest Plan is providing for its conservation and management. It specifies...

  9. On the role of model-based monitoring for adaptive planning under uncertainty

    NASA Astrophysics Data System (ADS)

    Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn

    2016-04-01

    Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory, triggered by the challenge of uncertainty in operational control, may offer solutions from which monitoring for adaptive planning can benefit. Specifically: (i) in control, observations are incorporated into the model through data assimilation, updating the present state, boundary conditions, and parameters based on new observations, diminishing the shadow of the past; (ii) adaptive control is a way to modify the characteristics of the internal model, incorporating new knowledge on the system, countervailing the inhibition of learning; and (iii) in closed-loop control, a continuous system update equips the controller with "inherent robustness", i.e. to capacity to adapts to new conditions even when these were not initially considered. We aim to explore how inherent robustness addresses the challenge of surprise. Innovations in model-based control might help to improve and adapt the models used to support adaptive delta management to new information (reducing uncertainty). Moreover, this would offer a starting point for using these models not only in the design of adaptive plans, but also as part of the monitoring. The proposed research requires multidisciplinary cooperation between control theory, the policy sciences, and integrated assessment modeling.

  10. When goals collide: monitoring the goals of multiple characters.

    PubMed

    Magliano, Joseph P; Taylor, Holly A; Kim, Hyun-Jeong Joyce

    2005-12-01

    Most story plots contain multiple characters who are independent, interact, and often have conflicting goals. One would expect that narrative understanding would require monitoring of the goals, concerns, and situations of multiple agents. There is considerable evidence that understanders monitor the primary protagonist's goal plans (e.g., Suh & Trabasso, 1993). However, there is relatively little research on the extent to which understanders monitor the goals of multiple agents. We investigated the impact of characters' roles and prominence on the extent to which understanders monitor the goal plans of multiple characters in a feature length film. In Experiment 1, participants made situation change judgments, and in Experiment 2, they verbally described scenes. Both types of judgments indicated that viewers monitor the goals and plans of multiple agents but do so to a greater extent for characters more prominent to the plotline.

  11. Plan execution monitoring with distributed intelligent agents for battle command

    NASA Astrophysics Data System (ADS)

    Allen, James P.; Barry, Kevin P.; McCormick, John M.; Paul, Ross A.

    2004-07-01

    As military tactics evolve toward execution centric operations the ability to analyze vast amounts of mission relevant data is essential to command and control decision making. To maintain operational tempo and achieve information superiority we have developed Vigilant Advisor, a mobile agent-based distributed Plan Execution Monitoring system. It provides military commanders with continuous contingency monitoring tailored to their preferences while overcoming the network bandwidth problem often associated with traditional remote data querying. This paper presents an overview of Plan Execution Monitoring as well as a detailed view of the Vigilant Advisor system including key features and statistical analysis of resource savings provided by its mobile agent-based approach.

  12. 78 FR 14226 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... groundfish sector to request exemptions from Federal fishing regulations through its annual operations plan... rule implementing the annual sector operations plans. However, sectors can request exemptions at any...-funded at-sea monitoring program will be required to develop a monitoring plan as part of its operation...

  13. Establishing a regional monitoring strategy: The Pacific Northwest Forest Plan

    Treesearch

    Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett

    1999-01-01

    This paper identifies lessons learned and issues raised during the development of an ecosystem monitoring strategy intended to support the Northwest Forest Plan. Adaptive ecosystem management, which requires monitoring as essential feedback to management, recognizes that action is necessary or appropriate, although knowledge may be imperfect. We suggest that this...

  14. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  15. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  16. Green Roofs: Federal Energy Management Program (FEMP) Federal Technology Alert

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scholz-Barth, K.; Tanner, S.

    In a ''green roof,'' a layer of vegetation (e.g., a roof garden) covers the surface of a roof to provide shade, cooler indoor and outdoor temperatures, and effective storm-water management to reduce runoff. The main components are waterproofing, soil, and plants. There are two basic kinds: intensive and extensive. An intensive green roof often features large shrubs and trees, and it can be expensive to install and maintain. An extensive green roof features shallow soil and low-growing, horizontally spreading plants that can thrive in the alpine conditions of many rooftops. These plants do not require a lot of water ormore » soil, and they can tolerate a significant amount of exposure to the sun and wind. This Federal Technology Alert focuses on the benefits, design, and implementation of extensive green roofs and includes criteria for their use on federal facilities.« less

  17. Northwest Forest Plan—the first 10 years (1994–2003): socioeconomic monitoring results.

    Treesearch

    S. Charnley

    2006-01-01

    The socioeconomic monitoring report addresses two evaluation questions posed in the Northwest Forest Plan (the Plan) Record of Decision and assesses progress in meeting five Plan socioeconomic goals. Volume I of the report contains key findings. Volume II addresses the question, Are predictable levels of timber and nontimber resources available and being produced? It...

  18. Northern spotted owl effectiveness monitoring plan for the Northwest Forest Plan.

    Treesearch

    Joseph Lint; Barry Noon; Robert Anthony; Eric Forsman; Martin Raphael; Michael Collopy; Edward. Starkey

    1999-01-01

    This report describes options for effectiveness monitoring of long-term status and trends of the northern spotted owl to evaluate the success of the Northwest Forest Plan in arresting downward population trends, and in maintaining and restoring the habitat conditions necessary to support viable owl populations on Federal lands. It describes options to address...

  19. Marbled murrelet effectiveness monitoring plan for the Northwest Forest Plan.

    Treesearch

    Sarah Madsen; Diane Evans; Thomas Hamer; Paul Henson; Sherri Miller; S. Kim Nelson; Daniel Roby; Martin Stapanian

    1999-01-01

    This report describes options for effectiveness monitoring of long-term status and trends to evaluate the success of the Northwest Forest Plan in maintaining and restoring marbled murrelet nesting habitat and populations on Federal lands. A two-phase approach is described that begins with developing reliable and repeatable processes for identifying nesting habitat and...

  20. 40 CFR 63.11468 - What are the monitoring requirements for new and existing sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... baghouse, including but not limited to air leaks, torn or broken bags or filter media, or any other... identified in the site-specific monitoring plan required by paragraph (c)(2) of this section. (vii) You must... submit to the Administrator or delegated authority for approval a site-specific monitoring plan for each...

  1. The strategy and design of the effectiveness monitoring program for the Northwest Forest Plan.

    Treesearch

    Barry S. Mulder; Barry R. Noon; Thomas A. Spies; Martin G. Raphael; Craig J. Palmer; Anthony R. Olsen; Gordon H. Reeves; Hartwell H. Welsh

    1999-01-01

    This report describes the logic and design of an effectiveness monitoring program for the Northwest Forest Plan. The program is prospective, providing an early warning of environmental change before irreversible loss has occurred. Monitoring is focused at two resource levels: individual species and specific ecosystem types. Selection of prospective indicators for the...

  2. Rockfall Milepoint 49 Monitoring Plan for Check Dams on Mt. Hood Highway (US 26) (M.P. 49.10 to M.P. 49.23)

    DOT National Transportation Integrated Search

    2003-07-31

    This Stormwater BMP Monitoring Plan details the approach to be used for monitoring : roadside ditch sediment traps located on Highway 26 in the Mt. Hood National Forest. : These sediment traps were designed and installed by ODOT for the capture of se...

  3. Planning for court monitoring

    DOT National Transportation Integrated Search

    1987-03-01

    Court monitoring is a planned approach to studying the handling of DWI offenders, from arrest through sentencing, either through actually observing court hearings or by reviewing case outcomes in court files. The booklet is designed to help groups in...

  4. Improving IMRT delivery efficiency using intensity limits during inverse planning.

    PubMed

    Coselmon, Martha M; Moran, Jean M; Radawski, Jeffrey D; Fraass, Benedick A

    2005-05-01

    Inverse planned intensity modulated radiotherapy (IMRT) fields can be highly modulated due to the large number of degrees of freedom involved in the inverse planning process. Additional modulation typically results in a more optimal plan, although the clinical rewards may be small or offset by additional delivery complexity and/or increased dose from transmission and leakage. Increasing modulation decreases delivery efficiency, and may lead to plans that are more sensitive to geometrical uncertainties. The purpose of this work is to assess the use of maximum intensity limits in inverse IMRT planning as a simple way to increase delivery efficiency without significantly affecting plan quality. Nine clinical cases (three each for brain, prostate, and head/neck) were used to evaluate advantages and disadvantages of limiting maximum intensity to increase delivery efficiency. IMRT plans were generated using in-house protocol-based constraints and objectives for the brain and head/neck, and RTOG 9406 dose volume objectives in the prostate. Each case was optimized at a series of maximum intensity ratios (the product of the maximum intensity and the number of beams divided by the prescribed dose to the target volume), and evaluated in terms of clinical metrics, dose-volume histograms, monitor units (MU) required per fraction (SMLC and DMLC delivery), and intensity map variation (a measure of the beam modulation). In each site tested, it was possible to reduce total monitor units by constraining the maximum allowed intensity without compromising the clinical acceptability of the plan. Monitor unit reductions up to 38% were observed for SMLC delivery, while reductions up to 29% were achieved for DMLC delivery. In general, complicated geometries saw a smaller reduction in monitor units for both delivery types, although DMLC delivery required significantly more monitor units in all cases. Constraining the maximum intensity in an inverse IMRT plan is a simple way to improve delivery efficiency without compromising plan objectives.

  5. Wildlife monitoring program plan

    NASA Technical Reports Server (NTRS)

    Sebesta, P.; Arno, R.

    1979-01-01

    A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.

  6. Evaluation of a commercial automatic treatment planning system for liver stereotactic body radiation therapy treatments.

    PubMed

    Gallio, Elena; Giglioli, Francesca Romana; Girardi, Andrea; Guarneri, Alessia; Ricardi, Umberto; Ropolo, Roberto; Ragona, Riccardo; Fiandra, Christian

    2018-02-01

    Automated treatment planning is a new frontier in radiotherapy. The Auto-Planning module of the Pinnacle 3 treatment planning system (TPS) was evaluated for liver stereotactic body radiation therapy treatments. Ten cases were included in the study. Six plans were generated for each case by four medical physics experts. The first two planned with Pinnacle TPS, both with manual module (MP) and Auto-Planning one (AP). The other two physicists generated two plans with Monaco TPS (VM). Treatment plan comparisons were then carried on the various dosimetric parameters of target and organs at risk, monitor units, number of segments, plan complexity metrics and human resource planning time. The user dependency of Auto-Planning was also tested and the plans were evaluated by a trained physician. Statistically significant differences (Anova test) were observed for spinal cord doses, plan average beam irregularity, number of segments, monitor units and human planning time. The Fisher-Hayter test applied to these parameters showed significant statistical differences between AP e MP for spinal cord doses and human planning time; between MP and VM for monitor units, number of segments and plan irregularity; for all those between AP and VM. The two plans created by different planners with AP were similar to each other. The plans created with Auto-Planning were comparable to the manually generated plans. The time saved in planning enables the planner to commit more resources to more complex cases. The independence of the planner enables to standardize plan quality. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  7. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  8. Planning for execution monitoring on a planetary rover

    NASA Technical Reports Server (NTRS)

    Gat, Erann; Firby, R. James; Miller, David P.

    1990-01-01

    A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.

  9. A representation for error detection and recovery in robot task plans

    NASA Technical Reports Server (NTRS)

    Lyons, D. M.; Vijaykumar, R.; Venkataraman, S. T.

    1990-01-01

    A general definition is given of the problem of error detection and recovery in robot assembly systems, and a general representation is developed for dealing with the problem. This invariant representation involves a monitoring process which is concurrent, with one monitor per task plan. A plan hierarchy is discussed, showing how diagnosis and recovery can be handled using the representation.

  10. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  11. Remote sensing applied to crop disease control, urban planning, and monitoring aquatic plants, oil spills, rangelands, and soil moisture

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The application of remote sensing techniques to land management, urban planning, agriculture, oceanography, and environmental monitoring is discussed. The results of various projects are presented along with cost effective considerations.

  12. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  13. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  14. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  15. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  16. Cornhusker Army Ammunition Plant Longterm Groundwater Monitoring Health and Safety Plan

    DTIC Science & Technology

    1997-06-01

    Enclosed please find fifteen copies of the final Health and Safety Plan for the long term ground water monitoring at the Cornhusker Army Ammunitions...Plant. Enclosed within the plan is a letter dated June 6, 1997 containing responses to the comments received from William Houser. The responses to Mr. Houser’s comments have also been incorporated into the document as appropriate.

  17. Northwest Forest Plan—the first 10 years (1994-2003): synthesis of monitoring and research results.

    Treesearch

    Richard W. Haynes; Bernard T. Bormann; Danny C. Lee; Jon R. Martin

    2006-01-01

    It has been 10 years since the Northwest Forest Plan (the Plan) came into being at the direction of President Clinton. This report synthesizes the status and trends of five major elements of the Plan: older forests, species, aquatic systems, socioeconomics, and adaptive management and monitoring. It synthesizes new science that has resulted from a decade of research....

  18. How do we know how many salmon returned to spawn? Implementing the California Coastal salmonid monitoring plan in Mendocino County, California

    Treesearch

    Sean P. Gallagher; David W. Wright

    2012-01-01

    California's coastal salmon and steelhead populations are listed under California and Federal Endangered Species Acts; both require monitoring to provide measures of recovery. Since 2004 the California Department of Fish and Game and NOAA Fisheries have been developing a monitoring plan for California¡¯s coastal salmonids (the California Coastal Salmonid...

  19. Accidental spills at sea--risk, impact, mitigation and the need for co-ordinated post-incident monitoring.

    PubMed

    Kirby, Mark F; Law, Robin J

    2010-06-01

    A fully integrated and effective response to an oil or chemical spill at sea must include a well planned and executed post-incident assessment of environmental contamination and damage. While salvage, rescue and clean-up operations are generally well considered, including reviews and exercises, the expertise, resources, networks and logistical planning required to achieve prompt and effective post-spill impact assessment and monitoring are not generally well established. The arrangement and co-ordination of post-incident monitoring and impact assessment need to consider sampling design, biological effects, chemical analysis and collection/interpretation of expert local knowledge. This paper discusses the risks, impacts and mitigation options associated with accidental spills and considers the importance of pre-considered impact assessment and monitoring programmes in the wider response cycle. The PREMIAM (Pollution Response in Emergencies: Marine Impact Assessment and Monitoring; www.premiam.org) project is considered as an example of an improved approach to the planning, co-ordination and conduct of post-incident monitoring.

  20. Central Alaska Network vital signs monitoring plan

    USGS Publications Warehouse

    MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug

    2005-01-01

    Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.

  1. Application of constraint-based satellite mission planning model in forest fire monitoring

    NASA Astrophysics Data System (ADS)

    Guo, Bingjun; Wang, Hongfei; Wu, Peng

    2017-10-01

    In this paper, a constraint-based satellite mission planning model is established based on the thought of constraint satisfaction. It includes target, request, observation, satellite, payload and other elements, with constraints linked up. The optimization goal of the model is to make full use of time and resources, and improve the efficiency of target observation. Greedy algorithm is used in the model solving to make observation plan and data transmission plan. Two simulation experiments are designed and carried out, which are routine monitoring of global forest fire and emergency monitoring of forest fires in Australia. The simulation results proved that the model and algorithm perform well. And the model is of good emergency response capability. Efficient and reasonable plan can be worked out to meet users' needs under complex cases of multiple payloads, multiple targets and variable priorities with this model.

  2. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system wasmore » designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.« less

  3. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    PubMed

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system's ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.

  4. 36 CFR 219.12 - Monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...

  5. 36 CFR 219.12 - Monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...

  6. 36 CFR 219.12 - Monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...

  7. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... involvement of the responsible parties in the assessment; and (vii) A description of monitoring for.... (3) The monitoring component to the Draft Restoration Plan should address such factors as duration...

  8. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  9. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  10. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  11. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  12. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  13. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  14. A tentative discussion on the monitoring of water resources in China

    NASA Astrophysics Data System (ADS)

    Yang, Jianqing; Dai, Ning; Wu, Mengying; Wang, Guangsheng

    2016-10-01

    With the rapid economy development and social civilization progress, the Chinese Government also is improving ecological environmental conditions. More efforts have been made to solve water problems through the implementation of stringent water resources management, as a key government policy on water. Thus, monitoring of water resources has been strengthened, being a main component of the hydrological work in recent years. Compared with routine hydrological monitoring, water resources monitoring pays more attention to the quantity and quality variations of regional waters, to reflect the status of water in river basins and administrative regions. In this paper, the overall layout of the hydrometric network in China is presented, monitoring efforts of the natural water cycle and water consumptions are analyzed, methodologies of water resources monitoring, which are commonly applied in the country, are summed up. Taking the hydrometric network planning on interprovincial boundary waterbodies as example, a summary of the planning at interprovincial boundary river sections is presented. The planning can meet the need of water resources management of administrative divisions. It can also improve the overall water resources monitoring for the country.

  15. Building Software Agents for Planning, Monitoring, and Optimizing Travel

    DTIC Science & Technology

    2004-01-01

    defined as plans in the Theseus Agent Execution language (Barish et al. 2002). In the Web environment, sources can be quite slow and the latencies of...executor is based on a dataflow paradigm, actions are executed as soon as the data becomes available. Second, Theseus performs the actions in a...while Thesues provides an expressive language for defining information gathering and monitoring plans. The Theseus language supports capabilities

  16. TDRSS momentum unload planning

    NASA Technical Reports Server (NTRS)

    Cross, George R.; Potter, Mitchell A.; Whitehead, J. Douglass; Smith, James T.

    1991-01-01

    A knowledge-based system is described which monitors TDRSS telemetry for problems in the momentum unload procedure. The system displays TDRSS telemetry and commands in real time via X-windows. The system constructs a momentum unload plan which agrees with the preferences of the attitude control specialists and the momentum growth characteristics of the individual spacecraft. During the execution of the plan, the system monitors the progress of the procedure and watches for unexpected problems.

  17. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    NASA Astrophysics Data System (ADS)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  18. An active monitoring method for flood events

    NASA Astrophysics Data System (ADS)

    Chen, Zeqiang; Chen, Nengcheng; Du, Wenying; Gong, Jianya

    2018-07-01

    Timely and active detecting and monitoring of a flood event are critical for a quick response, effective decision-making and disaster reduction. To achieve the purpose, this paper proposes an active service framework for flood monitoring based on Sensor Web services and an active model for the concrete implementation of the active service framework. The framework consists of two core components-active warning and active planning. The active warning component is based on a publish-subscribe mechanism implemented by the Sensor Event Service. The active planning component employs the Sensor Planning Service to control the execution of the schemes and models and plans the model input data. The active model, called SMDSA, defines the quantitative calculation method for five elements, scheme, model, data, sensor, and auxiliary information, as well as their associations. Experimental monitoring of the Liangzi Lake flood in the summer of 2010 is conducted to test the proposed framework and model. The results show that 1) the proposed active service framework is efficient for timely and automated flood monitoring. 2) The active model, SMDSA, is a quantitative calculation method used to monitor floods from manual intervention to automatic computation. 3) As much preliminary work as possible should be done to take full advantage of the active service framework and the active model.

  19. Volunteer water monitoring: A guide for state managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-08-01

    Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.

  20. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  1. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  2. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  3. PLANNING STUDY TO MODEL AND MONITOR COAL PILE RUNOFF. PHASE I

    EPA Science Inventory

    The report describes a planning study for predicting and monitoring the hydrologic and chemical characteristics of effluent streams resulting from precipitation impacting on open storage of coal. It includes: a survey of utilities on storage habits and treatment systems for coal ...

  4. 75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...

  5. An MRI guided system for prostate laser ablation with treatment planning and multi-planar temperature monitoring

    NASA Astrophysics Data System (ADS)

    Xu, Sheng; Agarwal, Harsh; Bernardo, Marcelino; Seifabadi, Reza; Turkbey, Baris; Partanen, Ari; Negussie, Ayele; Glossop, Neil; Choyke, Peter; Pinto, Peter; Wood, Bradford J.

    2016-03-01

    Prostate cancer is often over treated with standard treatment options which impact the patients' quality of life. Laser ablation has emerged as a new approach to treat prostate cancer while sparing the healthy tissue around the tumor. Since laser ablation has a small treatment zone with high temperature, it is necessary to use accurate image guidance and treatment planning to enable full ablation of the tumor. Intraoperative temperature monitoring is also desirable to protect critical structures from being damaged in laser ablation. In response to these problems, we developed a navigation platform and integrated it with a clinical MRI scanner and a side firing laser ablation device. The system allows imaging, image guidance, treatment planning and temperature monitoring to be carried out on the same platform. Temperature sensing phantoms were developed to demonstrate the concept of iterative treatment planning and intraoperative temperature monitoring. Retrospective patient studies were also conducted to show the clinical feasibility of the system.

  6. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  7. SU-E-T-605: Performance Evaluation of MLC Leaf-Sequencing Algorithms in Head-And-Neck IMRT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jing, J; Lin, H; Chow, J

    2015-06-15

    Purpose: To investigate the efficiency of three multileaf collimator (MLC) leaf-sequencing algorithms proposed by Galvin et al, Chen et al and Siochi et al using external beam treatment plans for head-and-neck intensity modulated radiation therapy (IMRT). Methods: IMRT plans for head-and-neck were created using the CORVUS treatment planning system. The plans were optimized and the fluence maps for all photon beams determined. Three different MLC leaf-sequencing algorithms based on Galvin et al, Chen et al and Siochi et al were used to calculate the final photon segmental fields and their monitor units in delivery. For comparison purpose, the maximum intensitymore » of fluence map was kept constant in different plans. The number of beam segments and total number of monitor units were calculated for the three algorithms. Results: From results of number of beam segments and total number of monitor units, we found that algorithm of Galvin et al had the largest number of monitor unit which was about 70% larger than the other two algorithms. Moreover, both algorithms of Galvin et al and Siochi et al have relatively lower number of beam segment compared to Chen et al. Although values of number of beam segment and total number of monitor unit calculated by different algorithms varied with the head-and-neck plans, it can be seen that algorithms of Galvin et al and Siochi et al performed well with a lower number of beam segment, though algorithm of Galvin et al had a larger total number of monitor units than Siochi et al. Conclusion: Although performance of the leaf-sequencing algorithm varied with different IMRT plans having different fluence maps, an evaluation is possible based on the calculated number of beam segment and monitor unit. In this study, algorithm by Siochi et al was found to be more efficient in the head-and-neck IMRT. The Project Sponsored by the Fundamental Research Funds for the Central Universities (J2014HGXJ0094) and the Scientific Research Foundation for the Returned Overseas Chinese Scholars, State Education Ministry.« less

  8. Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, Jenny; Lyles, Brad; Cooper, Clay

    Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less

  9. 40 CFR 413.03 - Monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standard for total toxic organics (TTO), I certify that, to the best of my knowledge and belief, no dumping... monitoring report. I further certify that this facility is implementing the toxic organic management plan... POTWs shall submit a toxic organic management plan that specifies to the control authority's...

  10. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with the permit limitation for total toxic organics (TTO), I certify that, to the best of my knowledge... management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to the permitting...

  11. A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases.

    PubMed

    Narayanasamy, Ganesh; Stathakis, Sotirios; Gutierrez, Alonso N; Pappas, Evangelos; Crownover, Richard; Floyd, John R; Papanikolaou, Niko

    2017-10-01

    In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R 50% ), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R 50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 ( P < .05). For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V 12 Gy but required significantly lower monitor units, when compared to RapidArc plans.

  12. A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases

    PubMed Central

    Stathakis, Sotirios; Gutierrez, Alonso N.; Pappas, Evangelos; Crownover, Richard; Floyd, John R.; Papanikolaou, Niko

    2016-01-01

    Background: In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Methods: Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R50%), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. Results: A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 (P < .05). Conclusion: For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V12 Gy but required significantly lower monitor units, when compared to RapidArc plans. PMID:27612917

  13. Structure, Intent and Conformance Monitoring in ATC

    NASA Technical Reports Server (NTRS)

    Reynolds, Tom G.; Histon, Jonathan M.; Davison, Hayley J.; Hansman, R. John

    2004-01-01

    Infield studies of current Air Traffic Control operations it is found that controllers rely on underlying airspace structure to reduce the complexity of the planning and conformance monitoring tasks. The structure appears to influence the controller's working mental model through abstractions that reduce the apparent cognitive complexity. These structure-based abstractions are useful for the controller's key tasks of planning, implementing, monitoring, and evaluating tactical situations. In addition, the structure-based abstractions appear to be important in the maintenance of Situation Awareness. The process of conformance monitoring is analyzed in more detail and an approach to conformance monitoring which utilizes both the structure-based abstractions and intent is presented.

  14. The national response for preventing healthcare-associated infections: data and monitoring.

    PubMed

    Kahn, Katherine L; Weinberg, Daniel A; Leuschner, Kristin J; Gall, Elizabeth M; Siegel, Sari; Mendel, Peter

    2014-02-01

    Historically, the ability to accurately track healthcare-associated infections (HAIs) was hindered due to a lack of coordination among data sources and shortcomings in individual data sources. This paper presents the results of the evaluation of the HAI data and the monitoring component of the Action Plan, focusing on context (goals), inputs, and processes. We used the Content-Input-Process-Product framework, together with the HAI prevention system framework, to describe the transformative processes associated with data and monitoring efforts. Six HAI priority conditions in the 2009 Action Plan created a focus for the selection of goals and activities. Key Action Plan decisions included a phased-in data and monitoring approach, commitment to linking the selection of priority HAIs to highly visible national 5-year prevention targets, and the development of a comprehensive HAI database inventory. Remaining challenges relate to data validation, resources, and the opportunity to integrate electronic health and laboratory records with other provider data systems. The Action Plan's data and monitoring program has developed a sound infrastructure that builds upon technological advances and embodies a firm commitment to prioritization, coordination and alignment, accountability and incentives, stakeholder engagement, and an awareness of the need for predictable resources. With time, and adequate resources, it is likely that the investment in data-related infrastructure during the Action Plan's initial years will reap great rewards.

  15. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  16. Execution monitoring for a mobile robot system

    NASA Technical Reports Server (NTRS)

    Miller, David P.

    1990-01-01

    Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.

  17. Dimethyl Disulfide (DMDS) Fumigant Management Plan Template Phase 2

    EPA Pesticide Factsheets

    These templates provide a framework for developing your FMP, including sections on your supervising pesticide applicator, buffer zones, emergency response plan, handler information, tarp plan, soil conditions, signage, and air monitoring plan.

  18. [Compliance with guidelines by state plans for food and nutritional security in Brazil].

    PubMed

    Machado, Mick Lennon; Gabriel, Cristine Garcia; Soar, Claudia; Mamed, Gisele Rockenbach; Machado, Patrícia Maria de Oliveira; Lacerda, Josimari Telino de; Martins, Milena Corrêa; Marcon, Maria Cristina

    2018-02-05

    A descriptive and documental study was performed from August to October 2016 to analyze compliance by state plans for food and nutritional security (PlanSAN) with the guidelines set by the Brazilian National Policy for Food and Nutritional Security (PNSAN). The state plans were accessed via the websites of the Inter-Ministerial Chamber for Food and Nutritional Security (CAISAN) or the state governments, plus complementary data collection at the state level. All the states of Brazil joined the National System for Food and Nutritional Security (SISAN), while fewer than half (13 states, 48%) had drafted their plans. Of these, 5 (38%) of the PlanSAN had schedules that coincided with the same state's pluriannual plan, 5 (38%) of the PlanSAN specified the budget requirements for meeting the proposed targets, 7 (54%) specified mechanisms for monitoring the plan, and only 2 (15%) defined methodologies for monitoring food and nutritional security. The recent existence of (and adherence to) the CAISAN appear to be related to the lack of state plans in half the states. Although most of the states that did have plans met some of the guidelines laid out by the PNSAN, these mechanisms become weak and impractical when they lack earmarked budget funds to meet their targets. Since the PNSAN is structurally inter-sectorial, the development of plans requires collective work by various government departments. Importantly, the items analyzed here are all guidelines, which implies the need for mechanisms to monitor their actual implementation.

  19. Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.

    2001-07-01

    The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematicmore » application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.« less

  20. Development of Computerized Monitoring of Education Plans.

    ERIC Educational Resources Information Center

    Greene, J. Weldon; And Others

    The District of Columbia Public Schools initiated a multiyear planning process in 1983. Among other activities, the process calls for the computerized monitoring of the critical tasks of each of the district's major offices. These tasks, defined by the offices, are designed to facilitate the achievement of specific objectives designated in the…

  1. An assessment of a traffic monitoring system for a major traffic generator to improve regional planning : final presentation.

    DOT National Transportation Integrated Search

    2008-08-01

    Report Abstract: : The purpose of this guide is to aid the Texas Department of Transportation (TxDOT), Metropolitan Planning Organizations (MPO), and other state and local agencies to develop an effective traffic monitoring system for new major traff...

  2. 40 CFR 52.70 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...

  3. 40 CFR 52.70 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...

  4. 77 FR 20217 - Secondary National Ambient Air Quality Standards for Oxides of Nitrogen and Sulfur

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-03

    ... Planning and Standards (OAQPS), U.S. Environmental Protection Agency, Mail Code C504-06, Research Triangle... of Research 3. Implementation Challenges 4. Monitoring Plan Development and Stakeholder Participation B. Summary of Proposed Evaluation of Monitoring Methods C. Comments on Field Pilot Program and...

  5. Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round

    EPA Science Inventory

    Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round. Changes reflect performance of second round of testing at new location and with various changes to personnel. Additional changes reflect general improvements to the Version 1 test/QA...

  6. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  7. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  8. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  9. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  10. 40 CFR 62.14453 - What must I monitor?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What must I monitor? 62.14453 Section 62.14453 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste...

  11. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability and Meetings... amended, NOAA is soliciting public comment on the draft management plan and draft environmental assessment... draft environmental assessment will be considered if received on or before June 22, 2012. Public...

  12. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...

  13. Monitoring and Assuring the Quality of Digital Aerial Data

    NASA Technical Reports Server (NTRS)

    Christopherson, Jon

    2007-01-01

    This viewgraph presentation explains the USGS plan for monitoring and assuring the quality of digital aerial data. The contents include: 1) History of USGS Aerial Imaging Involvement; 2) USGS Research and Results; 3) Outline of USGS Quality Assurance Plan; 4) Other areas of Interest; and 5) Summary

  14. Revised ground-water monitoring compliance plan for the 300 area process trenches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less

  15. 1993 Annual Report: San Francisco estuary regional monitoring program for trace substances

    USGS Publications Warehouse

    Thompson, B.; Lacy, Jessica; Hardin, Dane; Grovhaug, Tom; Taberski, K.; Jassby, Alan D.; Cloern, James E.; Caffrey, J.; Cole, B.; Schoellhamer, David H.

    1993-01-01

    Summaries of other monitoring activities pertinent to regional monitoring are also included in the Report: a description of the Regional Board’s Bay Protection Studies, the Sacramento Coordinated Monitoring Program, and a wetlands monitoring plan are included.

  16. 3D conformal planning using low segment multi-criteria IMRT optimization

    PubMed Central

    Khan, Fazal; Craft, David

    2014-01-01

    Purpose To evaluate automated multicriteria optimization (MCO) – designed for intensity modulated radiation therapy (IMRT), but invoked with limited segmentation – to efficiently produce high quality 3D conformal radiation therapy (3D-CRT) plans. Methods Ten patients previously planned with 3D-CRT to various disease sites (brain, breast, lung, abdomen, pelvis), were replanned with a low-segment inverse multicriteria optimized technique. The MCO-3D plans used the same beam geometry of the original 3D plans, but were limited to an energy of 6 MV. The MCO-3D plans were optimized using fluence-based MCO IMRT and then, after MCO navigation, segmented with a low number of segments. The 3D and MCO-3D plans were compared by evaluating mean dose for all structures, D95 (dose that 95% of the structure receives) and homogeneity indexes for targets, D1 and clinically appropriate dose volume objectives for individual organs at risk (OARs), monitor units (MUs), and physician preference. Results The MCO-3D plans reduced the OAR mean doses (41 out of a total of 45 OARs had a mean dose reduction, p<<0.01) and monitor units (seven out of ten plans have reduced MUs; the average reduction is 17%, p=0.08) while maintaining clinical standards on coverage and homogeneity of target volumes. All MCO-3D plans were preferred by physicians over their corresponding 3D plans. Conclusion High quality 3D plans can be produced using MCO-IMRT optimization, resulting in automated field-in-field type plans with good monitor unit efficiency. Adopting this technology in a clinic could improve plan quality, and streamline treatment plan production by utilizing a single system applicable to both IMRT and 3D planning. PMID:25413405

  17. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less

  18. Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric

    2005-10-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluatemore » the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin developed with the efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha) coho salmon and (O. kisutch) and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (BOR 1988). The most notable development was the construction and operation of Three-Mile Falls Dam (3MD) and other irrigation projects that dewatered the Umatilla River during salmon migrations. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and the Oregon Department of Fish and Wildlife (ODFW) developed the Umatilla Hatchery Master Plan to restore the historical fisheries in the basin. The plan was completed in 1990 and included the following objectives: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Produce almost 48,000 adult returns to Three-Mile Falls Dam. The goals were reviewed in 1999 and were changed to 31,500 adult salmon and steelhead returns (Table 2). We conduct core long-term monitoring activities each year as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), genetic monitoring (Currens & Schreck 1995, Narum et al. 2004), and habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998). Our project goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. This is the only project that monitors the restoration of naturally producing salmon and steelhead in the basin.« less

  19. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench beganmore » in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.« less

  20. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee

    2003-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  1. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2004-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  2. Evaluation and prioritization of stream habitat monitoring in the Lower Columbia Salmon and Steelhead Recovery Domain as related to the habitat monitoring needs of ESA recovery plans

    USGS Publications Warehouse

    Puls, Amy L.; Anlauf Dunn, Kara; Graham Hudson, Bernadette

    2014-01-01

    The lower Columbia River and its tributaries once supported abundant runs of salmon and steelhead; however, there are five species currently listed under the federal Endangered Species Act (ESA). The National Marine Fisheries Service has completed, and is proposing for adoption, a comprehensive ESA Recovery Plan for the Lower Columbia Evolutionarily Significant Units (ESUs) based on the recovery plans developed by Oregon and Washington. One of the primary factors attributed to the decline of these species is habitat degradation. There are numerous entities conducting status and/or trends monitoring of instream habitat in the lower Columbia River Basin, but because the programs were developed for agency specific reasons, the existing monitoring efforts are not well coordinated, and often lack the spatial coverage, certainty, or species coverage necessary to answer questions related to status and trends of the ESA listed populations. The Pacific Northwest Aquatic Monitoring Partnership’s Integrated Status and Trends Monitoring (ISTM) project was initiated to improve integration of existing and new monitoring efforts by developing recommendations for sampling frames, protocols, and data sharing. In an effort to meet the ISTM project goals, five objectives were identified: (1) identify and prioritize decisions, questions, and monitoring objectives, (2) evaluate how existing programs align with these management decisions, questions, and objectives, (3) identify the most appropriate monitoring design to inform priority management decisions, questions, and objectives, (4) use trade-off analysis to develop specific recommendations for monitoring based on outcomes of Objectives 1-3 and (5) recommend implementation and reporting mechanisms. This report summarizes the effort to address Objectives 1 and 2, detailing the commonalities among the habitat characteristics that all entities measure and monitor, and how the metrics align with the priorities listed in the comprehensive recovery plan for the Lower Columbia ESUs.

  3. 40 CFR 130.9 - Designation and de-designation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...

  4. High priority needs for range-wide monitoring of North American landbirds

    USGS Publications Warehouse

    Dunn, Erica H.; Altman, B.L.; Bart, J.; Beardmore, C.J.; Berlanga, H.; Blancher, P.J.; Butcher, G.S.; Demarest, D.W.; Dettmers, R.; Hunter, W.C.; Iñigo-Elias, Eduardo E.; Panjabi, A.O.; Pashley, D.N.; Ralph, C.J.; Rich, T.D.; Rosenberg, K.V.; Rustay, C.M.; Ruth, J.M.; Will, T.C.

    2005-01-01

    This document is an extension of work done for the Partners in Flight North American Landbird Conservation Plan (Rich et al. 2004). The Continental Plan reviewed conservation status of the 448 native landbird species that regularly breed in the United States and Canada. Two groups of species were identified as having high conservation importance: the PIF Watch List, made up of species for which there is conservation concern, and Stewardship Spices that are particularly characteristic of regional avifaunas. In addition, continental scale monitoring needs were identified for all species. Here we extend the monitoring needs aspect of the Plan, providing additional detail and suggesting the best means of filling the gaps in broad-scale, long-term trend monitoring. This analysis and report was compiled by the Partners in Flight (PIF) Science Committee as a contribution to current work by the North American Bird Conservation Initiative to assess the status of bird population monitoring in North America and to make recommendations for improvements.

  5. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  6. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  7. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  8. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  9. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  10. Assessment of the Monitor Unit Objective tool for VMAT in the Eclipse treatment planning system.

    PubMed

    Jiménez-Puertas, Sara; Sánchez-Artuñedo, David; Hermida-López, Marcelino

    2018-01-01

    This work aims to achieve the highest possible monitor units (MU) reduction using the MU Objective tool included in the Eclipse treatment planning system, while preserving the plan quality. The treatment planning system Eclipse (Varian Medical Systems, Palo Alto, CA) includes a control mechanism for the number of monitor units of volumetric modulated arc therapy (VMAT) plans, named the MU Objective tool. Forty prostate plans, 20 gynecological plans and 20 head and neck plans designed with VMAT were retrospectively studied. Each plan ( base plan ) was optimized without using the MU Objective tool, and it was re-optimized with different values of the Maximum MU ( MaxMU ) parameter of the MU Objective tool. MU differences were analyzed with a paired samples t -test and changes in plan quality were assessed with a set of parameters for OARs and PTVs. The average relative MU difference [Formula: see text] considering all treatment sites, was the highest when MaxMU  = 400 (-4.2%, p  < 0.001). For prostate plans, the lowest [Formula: see text] was obtained (-3.7%, p  < 0.001). For head and neck plans [Formula: see text] was -7.3% ( p  < 0.001) and for gynecological plans [Formula: see text] was 7.0% ( p  = 0.002). Although similar MU reductions were observed for both sites, for some gynecological plans maximum differences were greater than 10%. All the assessed parameters for PTVs and OARs sparing showed average differences below 2%. For the three studied clinical sites, establishing MaxMU  = 400 led to the optimum MU reduction, maintaining the original dose distribution and dosimetric parameters practically unaltered.

  11. Monitoring outcomes for the Medicare Advantage program: methods and application of the VR-12 for evaluation of plans.

    PubMed

    Kazis, Lewis E; Selim, Alfredo J; Rogers, William; Qian, Shirley X; Brazier, John

    2012-01-01

    The Veterans RAND 12-Item Health Survey (VR-12) is one of the major patient-reported outcomes for ranking the Medicare Advantage (MA) plans in the Health Outcomes Survey (HOS). Approaches for scoring physical and mental health are given using contemporary norms and regression estimators. A new metric approach for the VR-12 called the "VR-6D" is presented with case-mix adjustments for monitoring plans that combine utilities and mortality. Results show that the models for ranking health outcomes of the plans are robust and credible. Future directions include the use of utilities for evaluating and ranking of MA plans.

  12. Evaluation of the Monitor-CTA Automatic Vehicle Monitoring System

    DOT National Transportation Integrated Search

    1974-03-01

    In June 1972 the Urban Mass Transportation Administration requested that the Transportation System Center of DOT perform an evaluation of the CTA (Chicago Transit Authority) Monitor-Automatic Vehicle Monitor (AVM) system. TSC planned the overall eval...

  13. 75 FR 54773 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    .... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These.../Verification of Continued Attainment, Contingency Plan, and Conformity Determination Under Limited Maintenance...

  14. Educational Technology, E.C.I.A. Chapter 2. Final Evaluation Report.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    The Planning, Monitoring and Implementing (PMI) Evaluation Model for Decision-Making was used by the District of Columbia Public Schools to monitor their Office of Educational Technology in its efforts to provide direction and coordination for computer related activities, and to plan and implement educational television projects in math and…

  15. Management, Planning, and Monitoring Population Education Programmes. Abstract-Bibliography Series 8.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…

  16. 78 FR 54173 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Maintenance Plan Update...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... direct final rule in the Federal Register informing the public that the rule will not take effect... maintenance period, a commitment to maintain the existing monitoring network, factors and procedures to be... Network Indiana currently operates two SO 2 monitors in Lake County, Indiana. Indiana has committed to...

  17. 40 CFR 62.14454 - How must I monitor the required parameters?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How must I monitor the required parameters? 62.14454 Section 62.14454 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital...

  18. No-migration variance petition. Appendices C--J: Volume 5, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.

  19. Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    2009-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less

  20. Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Campbell, Sam

    Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less

  1. 75 FR 9392 - New England Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... monitoring; require electronic monitoring; and address other elements of catch monitoring in the Atlantic... development of catch monitoring alternatives for inclusion in Amendment 5 to the Atlantic Herring Fishery Management Plan (FMP); alternatives may include management measures to: improve quota monitoring and...

  2. INVESTIGATING THE EFFICACY OF CLINICAL TRIAL MONITORING STRATEGIES: Design and Implementation of the Cluster Randomized START Monitoring Substudy

    PubMed Central

    Hullsiek, Katherine Huppler; Kagan, Jonathan M; Engen, Nicole; Grarup, Jesper; Hudson, Fleur; Denning, Eileen T; Carey, Catherine; Courtney-Rodgers, David; Finley, Elizabeth B; Jansson, Per O; Pearson, Mary T; Peavy, Dwight E; Belloso, Waldo H

    2014-01-01

    Background Trial monitoring protects participant safety and study integrity. While monitors commonly go on-site to verify source data, there is little evidence that this practice is efficient or effective. An ongoing international HIV treatment trial (START) provides an opportunity to explore the usefulness of different monitoring approaches. Methods All START sites are centrally monitored and required to follow a local monitoring plan requiring specific quality assurance activities. Additionally, sites were randomized (1:1) to receive, or not receive, annual on-site monitoring. The study will determine if on-site monitoring increases the identification of major protocol deviations (eligibility or consent violations, improper study drug use, primary or serious event underreporting, data alteration or fraud). Results The START study completed enrollment in December 2013, with planned follow-up through December 2016. The monitoring study is ongoing at 196 sites in 34 countries. Results are expected when the START study concludes in December 2016. PMID:25973346

  3. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  4. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shonder, John A; Hughes, Patrick; Atkin, Erica

    2006-11-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipmentmore » prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.« less

  5. New FEDS Software Helps You Design for Maximum Energy Efficiency, Minimum Cost

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilbride, Theresa L.

    2003-01-30

    This article was written for the Partner Update a newsletter put out by Potomac Communications for DOE's Rebuild America program. The article describes the FEDS (Federal Energy Decision System) software, the official analytical tool of the Rebuild America program. This software, developed by PNNL with support from DOE, FEMP and Rebuild, helps government entities and contractors make informed decisions about which energy efficiency improvements are the most cost effective for their facilities. FEDS churns thru literally thousands of calculations accounting for energy uses, costs, and interactions from different types of HVAC systems, lighting types, insulation levels, building types, occupancy levelsmore » and times. FEDS crunchs the numbers so decision makers can get fast reliable answers on which alternatives are the best for their particular building. In this article, we're touting the improvements in the latest upgrade of FEDS, which is available free to Rebuild America partners. We tell partners what FEDS does, how to order it, and even where to get tech support and training.« less

  6. Superfund record of decision (EPA Region 5): Feed Materials Production Center, (USDOE), Operable Unit 4, Fernald, Hamilton County, OH, December 7, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. The materials within Operable Unit 4 exhibit a wide range of properties. Most notable would be the elevated direct radiation associated with the K-65 residues versus the much lower direct radiation associated with cold metal oxides in Silo 3. Even more significant would be the much lower levels of contamination associated with the soils and building materials, like concrete, within the Operable Unit 4 Study Area. On the basis of the evaluation of final alternatives, the selected remedy addressing Operable Unitmore » 4 at the FEMP is a combination of Alternatives 3A.1/Vit - Removal, Vitrification, and Off-site Disposal - Nevada Test Site (NTS); 3B.1/Vit - Removal, Vitrification, and Off-site Disposal - NTS; and 2C - Demolition, Removal and On-Property Disposal.« less

  7. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peelle, E.; Schweitzer, M.; Scharre, P.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less

  8. Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites

    USGS Publications Warehouse

    Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.

    2016-01-01

    Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.

  9. 30 CFR 250.221 - What environmental monitoring information must accompany the EP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What environmental monitoring information must... monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP: (a) Monitoring systems. A description of any existing and planned...

  10. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  11. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  12. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  13. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  14. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  15. Design of Cycle 3 of the National Water-Quality Assessment Program, 2013-23: Part 2: Science plan for improved water-quality information and management

    USGS Publications Warehouse

    Rowe, Gary L.; Belitz, Kenneth; Demas, Charlie R.; Essaid, Hedeff I.; Gilliom, Robert J.; Hamilton, Pixie A.; Hoos, Anne B.; Lee, Casey J.; Munn, Mark D.; Wolock, David W.

    2013-01-01

    This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate. However, a combination of funding growth and extensive collaboration with other USGS programs and other Federal, State, and local agencies, public interest groups, professional and trade associations, academia, and private industry will be needed to fully realize the monitoring and modeling goals laid out in this plan (USGS Fact Sheet 2013-3008).

  16. User manual and spreadsheet tool for implementing performance planning for rural planning organizations.

    DOT National Transportation Integrated Search

    2017-03-01

    The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...

  17. Global Atmospheric Monitoring

    ERIC Educational Resources Information Center

    Wallen, Carl C.

    1975-01-01

    The global atmospheric monitoring plans of the World Meteorological Organization are detailed. Single and multipurpose basic monitoring systems and the monitoring of chemical properties are discussed. The relationship of the World Meteorological Organization with the United Nations environment program is discussed. A map of the World…

  18. 77 FR 66947 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... NMFS, copies of addenda to FY 2012 sector operations plans detailing industry-funded monitoring plans... from Federal fishing regulations through its annual operations plan (for more information on sector operations plans and regulatory exemptions, see the fishing year 2012 sector operations plan proposed rule...

  19. Strategies for monitoring terrestrial animals and habitats

    Treesearch

    Richard Holthausen; Raymond L. Czaplewski; Don DeLorenzo; Greg Hayward; Winifred B. Kessler; Pat Manley; Kevin S. McKelvey; Douglas S. Powell; Leonard F. Ruggiero; Michael K. Schwartz; Bea Van Horne; Christina D. Vojta

    2005-01-01

    This General Technical Report (GTR) addresses monitoring strategies for terrestrial animals and habitats. It focuses on monitoring associated with National Forest Management Act planning and is intended to apply primarily to monitoring efforts that are broader than individual National Forests. Primary topics covered in the GTR are monitoring requirements; ongoing...

  20. 40 CFR 63.505 - Parameter monitoring levels and excursions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... less than 4 hours in an operating day and more than two of the hours during the period of operation do... filling period for the storage vessel, is above the maximum level or below the minimum level established... plan, during the filling period for the storage vessel. (ii) If the monitoring plan does not specify...

  1. 76 FR 39103 - Science Advisory Board Staff Office Notification of a Public Teleconference of the Air Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... draft plans for Photochemical Assessment Monitoring Stations (PAMS) Network Re-engineering. DATES: A... information concerning the EPA CASAC can be found at the EPA CASAC Web site at http://www.epa.gov/casac . Any inquiry regarding EPA's draft plans for PAMS Network Re-engineering should be directed to Mr. Kevin...

  2. Monitoring the Effective and Efficient Use of Land: The English Approach

    NASA Astrophysics Data System (ADS)

    Ganser, Robin

    In England quantified targets for the reuse of brownfields and of existing buildings place particular requirements on the planning system as part of the overall strategy to make effective use of natural resources. Achieving these targets is not free of obstacles and potential conflicts. Therefore monitoring of policy implementation is a necessity in the planning system.

  3. 75 FR 75059 - Mandatory Reporting of Greenhouse Gases: Injection and Geologic Sequestration of Carbon Dioxide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... monitoring will achieve detection and quantification of CO 2 in the event surface leakage occurs. The UIC... leakage detection monitoring system or technical specifications should also be described in the MRV plan... of injected CO 2 or from another cause (e.g. natural variability). The MRV plan leakage detection and...

  4. Learning about the Effects of Development Education Programmes: Strengthening Planning, Monitoring, and Evaluation (PME) through Reflective Practice

    ERIC Educational Resources Information Center

    Van Ongevalle, Jan; Huyse, Huib; Van Petegem, Peter

    2013-01-01

    This article reports on the results of an action research project (2010-13) in which ten Belgian organizations who implement development education programmes explored different planning, monitoring, and evaluation (PME) approaches with the aim of learning more effectively about their results. PME approaches piloted included outcome mapping, most…

  5. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

  6. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

  7. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

  8. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

  9. Improving Student Achievement through a Systematic Instructional Monitoring Plan.

    ERIC Educational Resources Information Center

    Mahan, David J.

    Based on four very basic but important premises, the Instructional Monitoring Plan has resulted in significant learning gains by middle school students in the St. Louis (Missouri) public school system. First, the staff must define what is to be taught by the teacher and learned by the students. Second, all faculty members must be aware of the…

  10. 40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...

  11. 40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...

  12. Developing Inventory and Monitoring Programs Based on Multiple Objectives

    Treesearch

    Daniel L. Schmoldt; David L. Peterson; David G. Silsbee

    1995-01-01

    Resource inventory and monitoring (I&M) programs in national parks combine multiple objectives in order to create a plan of action over a finite time horizon. Because all program activities are constrained by time and money, it is critical to plan I&M activities that make the best use of available agency resources. However, multiple objectives complicate a...

  13. 40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...

  14. Artificial Neural Networks

    NASA Technical Reports Server (NTRS)

    Niebur, Dagmar

    1995-01-01

    Electric power systems represent complex systems involving many electrical components whoseoperation has to be planned, analyzed, monitored and controlled. The time-scale of tasks in electricpower systems extends from long term planning years ahead to milliseconds in the area of control. The behavior of power systems is highly non-linear. Monitoring and control involves several hundred variables which are only partly available by measurements.

  15. District Computer Concerns: Checklist for Monitoring Instructional Use of Computers.

    ERIC Educational Resources Information Center

    Coe, Merilyn

    Designed to assist those involved with planning, organizing, and implementing computer use in schools, this checklist can be applied to: (1) assess the present state of instructional computer use in the district; (2) assist with the development of plans or guidelines for computer use; (3) support a start-up phase; and (4) monitor the…

  16. Monitoring game-based motor rehabilitation of patients at home for better plans of care and quality of life.

    PubMed

    Ponte, S; Gabrielli, S; Jonsdottir, J; Morando, M; Dellepiane, S

    2015-01-01

    This paper describes the biomedical, remote monitoring infrastructure developed and currently tested in the EU REHAB@HOME project to support home rehabilitation of the upper extremity of persons post-stroke and in persons with other neurological disorders, such as Multiple Sclerosis patients, in order to track their progress over therapy and improve their Quality of Life. The paper will specifically focus on describing the initial testing of the tele-rehabilitation system's components for patients' biomedical monitoring over therapy, which support the delivery and monitoring of more personalized, engaging plans of care by rehabilitation centers and services.

  17. Domestic water service delivery indicators and frameworks for monitoring, evaluation, policy and planning: a review.

    PubMed

    Kayser, Georgia L; Moriarty, Patrick; Fonseca, Catarina; Bartram, Jamie

    2013-10-11

    Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator--service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled.

  18. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of variousmore » water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.« less

  19. Domestic Water Service Delivery Indicators and Frameworks for Monitoring, Evaluation, Policy and Planning: A Review

    PubMed Central

    Kayser, Georgia L.; Moriarty, Patrick; Fonseca, Catarina; Bartram, Jamie

    2013-01-01

    Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator—service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled. PMID:24157507

  20. Pulse oximeters to self monitor oxygen saturation levels as part of a personalised asthma action plan for people with asthma.

    PubMed

    Welsh, Emma J; Carr, Robin

    2015-09-27

    We became aware through talking with people with asthma that some are using pulse oximeters to monitor their own blood oxygen levels during an asthma attack. Pulse oximeters are marketed by some suppliers as essential equipment for the home medicine cabinet. We wanted to find out if reliable evidence is available on use of pulse oximeters to self monitor asthma exacerbations at home. We decided to include only trials that used pulse oximeters as part of a personalised asthma action plan because it is important that decisions are made on the basis of symptoms as well as oxygen saturation, and that patients have a clear protocol to follow when their asthma worsens. To determine whether pulse oximeters used as part of a personalised asthma action plan for people with asthma are safer and more effective than a personalised asthma action plan alone. We searched the Cochrane Airways Group Specialised Register (CAGR), which includes reports identified through systematic searches of bibliographic databases including the Cochrane Central Register of Controlled Trials (CENTRAL), MEDLINE, EMBASE, the Cumulative Index to Nursing and Allied Health Literature (CINAHL), the Allied and Complementary Medicine Database (AMED) and PsycINFO, and by handsearching. We also searched ClinicalTrials.gov and the World Health Organization (WHO) trials portal. We planned to include randomised controlled trials (RCTs). Participants would have included adults, children or both with a diagnosis of asthma. We planned to include trials in which investigators compared participants who used pulse oximeters to monitor oxygen levels at home during an asthma exacerbation as part of a personalised asthma action plan (PAAP) versus those who used a PAAP without a pulse oximeter. We planned to include studies involving people receiving any treatment regimen provided that no medicine was included as part of the randomisation schedule. We planned to use standard methods as recommended by The Cochrane Collaboration. We found no studies and no evidence to support or refute the use of home pulse oximetry in self management of asthma; therefore, we can make no recommendations about use of a pulse oximeter as part of a PAAP. We found no reliable data to support or refute patient use of pulse oximeters to monitor oxygen saturation levels when experiencing an asthma attack. People should not use a pulse oximeter without seeking advice from a qualified healthcare professional.We identified no compelling rationale for home monitoring of oxygen levels in isolation for most people with asthma. Some people have a reduced perception of the severity of their own breathlessness when exposed to hypoxia. If trials on self monitoring of oxygen levels in the blood by pulse oximeter at home by people with asthma are conducted, the pulse oximeter must be given as part of a personalised asthma action plan.

  1. 15 CFR 970.522 - Monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...

  2. 15 CFR 970.522 - Monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...

  3. 15 CFR 970.522 - Monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...

  4. 15 CFR 970.522 - Monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...

  5. 15 CFR 970.522 - Monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...

  6. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  7. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  8. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  9. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  10. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  11. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction.... (iii) A detailed description of sampling and monitoring procedures, including sampling and monitoring locations in the system, the equipment to be used, sampling and monitoring frequency, and planned analytical...

  12. Chloropicrin Fumigant Management Plan Phase 2 Templates

    EPA Pesticide Factsheets

    These forms provide a framework for detailing the FMP elements of pesticide products containing the active ingredient chloropicrin, including application block, buffer zones, emergency response plan, tarp plan, soil conditions, and air monitoring.

  13. Y-12 Groundwater Protection Program Groundwater and Surface water Sampling and Analysis Plan for Calendar Year 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2006-01-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2006 will be in accordance with DOE Order 540.1 requirements and the following goals: {sm_bullet} to maintain surveillance of existing and potential groundwater contamination sources; {sm_bullet} to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; {sm_bullet} to identify and characterize long-term trends in groundwater quality at Y-12; and ! to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2006 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2006 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2006 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. The monitoring frequency and selection criteria for each sampling location is in Appendix C. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix D. If issued, addenda to this plan will be inserted in Appendix E, and Groundwater Monitoring Schedules (when issued) will be inserted in Appendix F. Guidance for managing purged groundwater is provided in Appendix G.« less

  14. 36 CFR 219.11 - Monitoring and evaluation for adaptive management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... viability is high and population characteristics cannot be reliably inferred from ecological conditions. The...) Monitoring and evaluation of social and economic sustainability. The plan monitoring strategy for the monitoring and evaluation of social and economic sustainability should provide for periodic review of...

  15. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  16. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  17. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  18. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  19. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  20. Development of a smart timber bridge - a five-year plan

    Treesearch

    Brent M. Phares; Terry J. Wipf; Ursula Deza; James P. Wacker

    2011-01-01

    This paper outlines a 5-year research plan for the development of a structural health monitoring system for timber bridges. A series of studies identify and evaluate various sensing technologies for measurement of structural adequacy and/or deterioration parameters. The overall goal is to develop a turn-key system to analyze, monitor, and report on the performance and...

  1. Environmental Assessment for Integrated Natural Resources Management Plan Activities at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2013-01-28

    and coordination services by planning for and adapting to a rapidly changing military mission. 2. Restore the longleaf pine ecosystem and recover...success by supporting the Eglin AFB NRS adaptive management efforts through statistically sound, scientifically based monitoring of community...conservation targets, including sandhills, flatwoods, steepheads, seepage slopes, and stream habitats. Ecological monitoring supports adaptive

  2. Design of an ecological monitoring strategy for the Forest Plan in the Pacific Northwest

    Treesearch

    Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett

    2003-01-01

    The growing literature on ecosystem management describes an adaptive system in which monitoring measures progress toward goals, increases our knowledge, and improves our plans (e.g., Holling 1978; Walters 1986; Duffus III 1994; Everett et al. 1994; Grumbine 1994; Bormann et al. 1995; Gunderson et al. 1995; Interagency Ecosystem Management Task Force 1995; Montgomery et...

  3. Multilevel semantic analysis and problem-solving in the flight-domain

    NASA Technical Reports Server (NTRS)

    Chien, R. T.

    1982-01-01

    The use of knowledge-base architecture and planning control; mechanisms to perform an intelligent monitoring task in the flight domain is addressed. The route level, the trajectory level, and parts of the aerodynamics level are demonstrated. Hierarchical planning and monitoring conceptual levels, functional-directed mechanism rationalization, and using deep-level mechanism models for diagnoses of dependent failures are discussed.

  4. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

    NASA Technical Reports Server (NTRS)

    Wilson, Deborah M.; Miller, Ralinda R.

    2015-01-01

    The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

  5. Dazomet Fumigant Management Plan Phase 2 Templates

    EPA Pesticide Factsheets

    These templates provide a framework for reporting application block information, buffer zones, emergency response plan, tarp plan, soil conditions, air monitoring, and more for pesticide products containing the active ingredient dazomet, such as Basamid G.

  6. DynAMo: A Modular Platform for Monitoring Process, Outcome, and Algorithm-Based Treatment Planning in Psychotherapy

    PubMed Central

    Laireiter, Anton Rupert

    2017-01-01

    Background In recent years, the assessment of mental disorders has become more and more personalized. Modern advancements such as Internet-enabled mobile phones and increased computing capacity make it possible to tap sources of information that have long been unavailable to mental health practitioners. Objective Software packages that combine algorithm-based treatment planning, process monitoring, and outcome monitoring are scarce. The objective of this study was to assess whether the DynAMo Web application can fill this gap by providing a software solution that can be used by both researchers to conduct state-of-the-art psychotherapy process research and clinicians to plan treatments and monitor psychotherapeutic processes. Methods In this paper, we report on the current state of a Web application that can be used for assessing the temporal structure of mental disorders using information on their temporal and synchronous associations. A treatment planning algorithm automatically interprets the data and delivers priority scores of symptoms to practitioners. The application is also capable of monitoring psychotherapeutic processes during therapy and of monitoring treatment outcomes. This application was developed using the R programming language (R Core Team, Vienna) and the Shiny Web application framework (RStudio, Inc, Boston). It is made entirely from open-source software packages and thus is easily extensible. Results The capabilities of the proposed application are demonstrated. Case illustrations are provided to exemplify its usefulness in clinical practice. Conclusions With the broad availability of Internet-enabled mobile phones and similar devices, collecting data on psychopathology and psychotherapeutic processes has become easier than ever. The proposed application is a valuable tool for capturing, processing, and visualizing these data. The combination of dynamic assessment and process- and outcome monitoring has the potential to improve the efficacy and effectiveness of psychotherapy. PMID:28729233

  7. The managed care contract: the blueprint for monitoring agreements.

    PubMed

    Hummel, J R; Cooper, S J

    2001-06-01

    Healthcare providers generally undertake monitoring programs of managed care arrangements as a way of analyzing financial performance, uncovering lapses in contractually mandated performance that might expose the organization to financial loss, and gathering information that can be helpful in renegotiating the contract or negotiating new arrangements. To secure access to the information needed to achieve these goals, the provider should ensure that the contract spells out the information required, the health plan's obligations to supply this information, and the consequences of the plan's failure to meet those obligations. Such consequences may include financial penalties for the plan and special termination rights for the provider. Without a contractually explicit assurance that the needed information will be available, a provider may find itself with no way to achieve its contract-monitoring goals.

  8. Regional Monitoring Plan for the Detection of Allergens in Food from Campania Region. First Year Monitoring Results

    PubMed Central

    Biondi, Loredana; Pellicanò, Roberta; Caligiuri, Vincenzo; Nava, Donatella

    2014-01-01

    Food allergens are substances able to induce an abnormal immunological response in sensitive individuals. The presence of allergens in food must be reported in tables (Directive 2003/89/EC). In this study we report the data of a monitoring plan carried out in the Campania Region during the 2012 for the detection of allergens (ovoalbumine and β-lattoglobulin) in food of different origin. The analisys were performed by means of ELISA assays. The percentage of analyzes with the presence of allegens not declared on the label is 4.3%, out of a total of 208 analyzes. It is therefore important to continue monitoring activities by the competent Authorities. PMID:27800313

  9. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  10. Public Participation, Education, and Engagement in Drought Planning

    NASA Astrophysics Data System (ADS)

    Bathke, D. J.; Wall, N.; Haigh, T.; Smith, K. H.; Bernadt, T.

    2014-12-01

    Drought is a complex problem that typically goes beyond the capacity, resources, and jurisdiction of any single person, program, organization, political boundary, or sector. Thus, by nature, monitoring, planning for, and reducing drought risk must be a collaborative process. The National Drought Mitigation Center, in partnership with the National Integrated Drought Information System (NIDIS) Program Office and others, provides active engagement and education drought professionals, stakeholders, and the general public about managing drought-related risks through resilience planning, monitoring, and education. Using case studies, we discuss recruitment processes, network building, participation techniques, and educational methods as they pertain to a variety of unique audiences with distinct objectives. Examples include collaborative decision-making at a World Meteorological Organization conference; planning, and peer-learning among drought professionals in a community of practice; drought condition monitoring through citizen science networks; research and education dissemination with stakeholder groups; and informal learning activities for all ages. Finally, we conclude with evaluation methods, indicators of success, and lessons learned for increasing the effectiveness of our programs in increasing drought resilience.

  11. Influences of spoken word planning on speech recognition.

    PubMed

    Roelofs, Ardi; Ozdemir, Rebecca; Levelt, Willem J M

    2007-09-01

    In 4 chronometric experiments, influences of spoken word planning on speech recognition were examined. Participants were shown pictures while hearing a tone or a spoken word presented shortly after picture onset. When a spoken word was presented, participants indicated whether it contained a prespecified phoneme. When the tone was presented, they indicated whether the picture name contained the phoneme (Experiment 1) or they named the picture (Experiment 2). Phoneme monitoring latencies for the spoken words were shorter when the picture name contained the prespecified phoneme compared with when it did not. Priming of phoneme monitoring was also obtained when the phoneme was part of spoken nonwords (Experiment 3). However, no priming of phoneme monitoring was obtained when the pictures required no response in the experiment, regardless of monitoring latency (Experiment 4). These results provide evidence that an internal phonological pathway runs from spoken word planning to speech recognition and that active phonological encoding is a precondition for engaging the pathway. 2007 APA

  12. Delaware Valley Regional Planning Commission Philadelphia Metropolitan Region : planning for congestion

    DOT National Transportation Integrated Search

    2009-04-01

    The Delaware Valley Regional Planning Commission uses a systematic process for managing traffic congestion and monitoring transportation system performance in the Philadelphia metropolitan region. Guided by an advisory team of stakeholders, the agenc...

  13. Telemedicine in the Malaysian Multimedia Super Corridor: towards personalized lifetime health plans.

    PubMed

    Abidi, S S; Yusoff, Z

    1999-01-01

    The Malaysian Telemedicine initiative advocates a paradigm shift in healthcare delivery patterns by way of implementing a person-centred and wellness-focused healthcare system. This paper introduces the Malaysian Telemedicine vision, its functionality and associated operational conditions. In particular, we focus on the conceptualisation of one key Telemedicine component i.e. the Lifetime Health Plan (LHP) system--a distributed multimodule application for the periodic monitoring and generation of health-care advisories for all Malaysians. In line with the LHP project, we present an innovative healthcare delivery info-structure--LifePlan--that aims to provide life-long, pro-active, personalised, wellness-oriented healthcare services to assist individuals to manage and interpret their health needs. Functionally, LifePlan based healthcare services are delivered over the WWW, packaged as Personalised Lifetime Health Plans that allow individuals to both monitor their health status and to guide them in healthcare planning.

  14. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1991-01-01

    The design and functions of ALEPS (Automated Logistics Element Planning System) is a computer system that will automate planning and decision support for Space Station Freedom Logistical Elements (LEs) resupply and return operations. ALEPS provides data management, planning, analysis, monitoring, interfacing, and flight certification for support of LE flight load planning activities. The prototype ALEPS algorithm development is described.

  15. Wetland Mitigation Monitoring at the Fernald Preserve - 13200

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Powell, Jane; Bien, Stephanie; Decker, Ashlee

    The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluatedmore » from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)« less

  16. 77 FR 70939 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ... operations plans detailing industry-funded monitoring plans, and the supplemental environmental assessment... addenda to FY 2012 NE multispecies sector operations plans and contracts to add additional exemptions from... meeting December 20, 2012. Both of these meetings plan to discuss the sector exemption request to target...

  17. School Site Strategic Planning To Improve District Performance.

    ERIC Educational Resources Information Center

    Lytle, James H.

    This paper describes the evolution of a school-based planning model that accommodates independent approaches to School District of Philadelphia goals. The description centers on key strategic planning decisions made during a 6-year period and three components of the planning model: the organizational monitoring and feedback system; organizational…

  18. A protocol using coho salmon to monitor Tongass National Forest Land and Resource Management Plan standards and guidelines for fish habitat.

    Treesearch

    M.D. Bryant; Trent McDonald; R. Aho; B.E. Wright; Michelle Bourassa Stahl

    2008-01-01

    We describe a protocol to monitor the effectiveness of the Tongass Land Management Plan (TLMP) management standards for maintaining fish habitat. The protocol uses juvenile coho salmon (Oncorhynchus kisutch) in small tributary streams in forested watersheds. We used a 3-year pilot study to develop detailed methods to estimate juvenile salmonid...

  19. Agents for Plan Monitoring and Repair

    DTIC Science & Technology

    2003-04-01

    events requires time and effort. In this paper, we describe how Heracles and Theseus , two information gathering and monitoring tools that we built...on an information agent platform, called Theseus , that provides the technology for efficiently executing agents for information gather- ing and...we can easily define a system for interactively planning a trip. The second is the Theseus information agent platform [Barish et al., 2000], which

  20. Skylab consolidated instrumentation plan for SL-1/SL-2

    NASA Technical Reports Server (NTRS)

    Clark, D. E.

    1972-01-01

    The consolidated instrumentation plan is presented for employing optical and electronic data acquisition systems to monitor the performance and trajectory of Skylab 1 and Skylab 2 vehicles during the launch phase. Telemetry, optical, and electronic tracking equipment on board the vehicles, and data acquisition systems monitoring the flights are discussed. Flight safety instrumentation, vehicle data transmission systems, and instrumentation geography are also described.

  1. 40 CFR 63.10020 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-of-control periods, or required monitoring system quality assurance or control activities in... monitoring system quality assurance or quality control activities including, as applicable, calibration... collect data according to this section and the site-specific monitoring plan required by § 63.10000(d). (b...

  2. 30 CFR 550.221 - What environmental monitoring information must accompany the EP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What environmental monitoring information must... Information Contents of Exploration Plans (ep) § 550.221 What environmental monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP...

  3. 30 CFR 250.221 - What environmental monitoring information must accompany the EP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What environmental monitoring information must... Contents of Exploration Plans (ep) § 250.221 What environmental monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP: (a...

  4. 40 CFR 63.10020 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-of-control periods, or required monitoring system quality assurance or control activities in... monitoring system quality assurance or quality control activities including, as applicable, calibration... collect data according to this section and the site-specific monitoring plan required by § 63.10000(d). (b...

  5. 30 CFR 550.221 - What environmental monitoring information must accompany the EP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What environmental monitoring information must... Information Contents of Exploration Plans (ep) § 550.221 What environmental monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP...

  6. 30 CFR 550.221 - What environmental monitoring information must accompany the EP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What environmental monitoring information must... Information Contents of Exploration Plans (ep) § 550.221 What environmental monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP...

  7. 40 CFR 63.10020 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-of-control periods, or required monitoring system quality assurance or control activities in... monitoring system quality assurance or quality control activities including, as applicable, calibration... collect data according to this section and the site-specific monitoring plan required by § 63.10000(d). (b...

  8. 15 CFR 971.603 - At-sea monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false At-sea monitoring. 971.603 Section 971.603 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL....603 At-sea monitoring. (a) An applicant must submit with its application a monitoring plan designed to...

  9. 15 CFR 971.603 - At-sea monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false At-sea monitoring. 971.603 Section 971.603 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL....603 At-sea monitoring. (a) An applicant must submit with its application a monitoring plan designed to...

  10. 15 CFR 971.603 - At-sea monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false At-sea monitoring. 971.603 Section 971.603 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL....603 At-sea monitoring. (a) An applicant must submit with its application a monitoring plan designed to...

  11. 15 CFR 971.603 - At-sea monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false At-sea monitoring. 971.603 Section 971.603 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL....603 At-sea monitoring. (a) An applicant must submit with its application a monitoring plan designed to...

  12. 15 CFR 971.603 - At-sea monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false At-sea monitoring. 971.603 Section 971.603 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL....603 At-sea monitoring. (a) An applicant must submit with its application a monitoring plan designed to...

  13. Handbook for Monitoring Industrial Wastewater.

    ERIC Educational Resources Information Center

    Associated Water & Air Resources Engineers, Inc., Nashville, TN.

    This manual for industrial wastewater monitoring covers the philosophy of monitoring needs, planning, sampling, measuring, and analysis. Sufficient detail is given for those who wish to explore more deeply some of the practical and theoretical aspects of any of the phases of a monitoring program. A logical procedure is suggested and direction…

  14. Rotorcraft master plan

    NASA Technical Reports Server (NTRS)

    Hwoschinsky, Peter V.

    1992-01-01

    The Rotorcraft Master Plan contains a comprehensive summary of active and planned FAA vertical flight research and development. Since the Master Plan is not sufficient for tracking project status and monitoring progress, the Vertical Flight Program Plan will provide that capability. It will be consistent with the Master Plan and, in conjunction with it, will serve to ensure a hospitable environment if the industry presents a practical vertical-flight initiative.

  15. San Diego Multiple Species Conservation Program (MSCP) Rare Plant Monitoring Review and Revision

    USGS Publications Warehouse

    McEachern, Kathryn; Pavlik, Bruce M.; Rebman, Jon; Sutter, Rob

    2007-01-01

    Introduction The San Diego Multiple Species Conservation Program (MSCP) was developed for the conservation of plants and animals in the south part of San Diego County, under the California Natural Community Conservation Planning Act of 1991 (California Department of Fish and Game) and the Federal Endangered Species Act of 1973, as amended (16 U.S. Code 1531-1544.) The Program is on the leading edge of conservation, as it seeks to both guide development and conserve at-risk species with the oversight of both State and Federal agencies. Lands were identified for inclusion in the MSCP based on their value as habitat for at-risk plants or plant communities (Natural Community Conservation Planning, 2005). Since its inception in the mid-1990s the Program has protected over 100,000 acres, involving 15 jurisdictions and the U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Game (CDFG) in the conservation of 87 taxa. Surveys for covered species have been conducted, and management and monitoring have been implemented at some high priority sites. Each jurisdiction or agency manages and monitors their conservation areas independently, while collaborating regionally for long-term protection. The San Diego MSCP is on the forefront of conservation, in one of the most rapidly growing urban areas of the country. The planning effort that developed the MSCP was state-of-the-art, using expert knowledge, spatial habitat modeling, and principles of preserve design to identify and prioritize areas for protection. Land acquisition and protection are ahead of schedule for most jurisdictions. Surveys have verified the locations of many rare plant populations known from earlier collections, and they provide general information on population size and health useful for further conservation planning. Management plans have been written or are in development for most MSCP parcels under jurisdictional control. Several agencies are developing databases for implementation and management tracking. In many ways this program is at the cutting edge of regional conservation, testing concepts, developing techniques, and demonstrating conservation effectiveness in new and uncharted ways. Periodic program review is crucial to the continued success of the program, as it moves from a phase of planning and acquisition to one of management and monitoring. Ecological monitoring is the key to assessing the success of the protection and management implemented at each individual reserve and for the MSCP as a whole. The ultimate goal of the Program is conservation of at-risk taxa and their habitats, as well as underlying ecological processes that contribute to sustainability of the ecosystem. Monitoring guidelines and timetables were developed by Ogden Environmental and Energy Services Co., Inc. (1996), and reviewed by Conservation Biology Institute (2001). The Program is in transition now, from the initial stage of land protection to one of land management and monitoring to determine population responses to management regimes. Several agencies have already invested substantial effort in status and trend monitoring, while others are developing their monitoring plans. Management is ongoing at several sites. With both management and monitoring, collaboration and coordination among jurisdictions can be especially fruitful in conserving resources and maximizing success.

  16. MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laub, S; Dunn, M; Galbreath, G

    2015-06-15

    Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less

  17. Monitoring and Evaluating Nonpoint Source Watershed Projects

    EPA Pesticide Factsheets

    This guide is written primarily for those who develop and implement monitoring plans for watershed management projects. it can also be used evaluate the technical merits of monitoring proposals they might sponsor. It is an update to the 1997 Guide.

  18. 40 CFR 63.8810 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... data. Monitoring failures that are caused by poor maintenance or careless operation are not... performance evaluation of each CMS in accordance with your site-specific monitoring plan. (4) You must operate...

  19. Implementing AIM-based monitoring for natural resource management

    USDA-ARS?s Scientific Manuscript database

    Successful monitoring programs are built on clearly-defined objectives, thorough planning, and organized implementation. However, natural resource management decisions need to be made at many different organizational levels and scales – from local to national. Developing separate monitoring programs...

  20. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  1. Golden Eagle Monitoring Plan for the Desert Renewable Energy Conservation Plan

    USGS Publications Warehouse

    Wiens, David; Kolar, Patrick; Katzner, Todd

    2018-01-01

    This report describes options for monitoring the status and population trends of the golden eagle (Aquila chrysaetos) within the Desert Renewable Energy Conservation Plan (DRECP) area of Southern California in maintaining stable or increasing population in the planning area. The report profiles the ecology of golden eagles in the region and provides a range of potential sampling options to address monitoring needs and objectives. This approach also focused on links between changes in human land-use, golden eagle nesting and foraging habitat conditions, and population dynamics. The report outlines how monitoring data from demographic, prey, and habitat studies were used to develop a predictive demographic model for golden eagles in the DRECP area. Results from the model simulations suggest increases in renewable energy development could have negative consequences for population trajectories. Results also suggest site-specific conservation actions could reduce the magnitude of negative impacts to the local population of eagles. A monitoring framework is proposed including: (1) annual assessments of site-occupancy and reproduction by territorial pairs of golden eagles (including rates at which sites become colonized or vacated over time); (2) estimates of survival, movements, and intensity of use of landscapes by breeding and non-breeding golden eagles; (3) periodic (conducted every two to four years) assessments of nesting and foraging habitats, prey populations, and associations with land-use and management activities; and (4) updating the predictive demographic model with new information obtained on eagles and associated population stressors. The results of this research were published in the Journal of Rapture Research, Wiens, David,Inman, Rich D., Esque, Todd C., Longshore, Kathleen M. and Nussear, Kenneth (2017). Spatial Demographic Models to Inform Conservation Planning of Golden Eagles in Renewable Energy Landscapes. 51(3):234-257.

  2. Volumetric modulated arc therapy vs. IMRT for the treatment of distal esophageal cancer.

    PubMed

    Van Benthuysen, Liam; Hales, Lee; Podgorsak, Matthew B

    2011-01-01

    Several studies have demonstrated that volumetric modulated arc therapy (VMAT) has the ability to reduce monitor units and treatment time when compared with intensity-modulated radiation therapy (IMRT). This study aims to demonstrate that VMAT is able to provide adequate organs at risk (OAR) sparing and planning target volume (PTV) coverage for adenocarcinoma of the distal esophagus while reducing monitor units and treatment time. Fourteen patients having been treated previously for esophageal cancer were planned using both VMAT and IMRT techniques. Dosimetric quality was evaluated based on doses to several OARs, as well as coverage of the PTV. Treatment times were assessed by recording the number of monitor units required for dose delivery. Body V(5) was also recorded to evaluate the increased volume of healthy tissue irradiated to low doses. Dosimetric differences in OAR sparing between VMAT and IMRT were comparable. PTV coverage was similar for the 2 techniques but it was found that IMRT was capable of delivering a slightly more homogenous dose distribution. Of the 14 patients, 12 were treated with a single arc and 2 were treated with a double arc. Single-arc plans reduced monitor units by 42% when compared with the IMRT plans. Double-arc plans reduced monitor units by 67% when compared with IMRT. The V(5) for the body was found to be 18% greater for VMAT than for IMRT. VMAT has the capability to decrease treatment times over IMRT while still providing similar OAR sparing and PTV coverage. Although there will be a smaller risk of patient movement during VMAT treatments, this advantage comes at the cost of delivering small doses to a greater volume of the patient. Copyright © 2011 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  3. Developing a monitoring and evaluation framework to integrate and formalize the informal waste and recycling sector: the case of the Philippine National Framework Plan.

    PubMed

    Serrona, Kevin Roy B; Yu, Jeongsoo; Aguinaldo, Emelita; Florece, Leonardo M

    2014-09-01

    The Philippines has been making inroads in solid waste management with the enactment and implementation of the Republic Act 9003 or the Ecological Waste Management Act of 2000. Said legislation has had tremendous influence in terms of how the national and local government units confront the challenges of waste management in urban and rural areas using the reduce, reuse, recycle and recovery framework or 4Rs. One of the sectors needing assistance is the informal waste sector whose aspiration is legal recognition of their rank and integration of their waste recovery activities in mainstream waste management. To realize this, the Philippine National Solid Waste Management Commission initiated the formulation of the National Framework Plan for the Informal Waste Sector, which stipulates approaches, strategies and methodologies to concretely involve the said sector in different spheres of local waste management, such as collection, recycling and disposal. What needs to be fleshed out is the monitoring and evaluation component in order to gauge qualitative and quantitative achievements vis-a-vis the Framework Plan. In the process of providing an enabling environment for the informal waste sector, progress has to be monitored and verified qualitatively and quantitatively and measured against activities, outputs, objectives and goals. Using the Framework Plan as the reference, this article developed monitoring and evaluation indicators using the logical framework approach in project management. The primary objective is to institutionalize monitoring and evaluation, not just in informal waste sector plans, but in any waste management initiatives to ensure that envisaged goals are achieved. © The Author(s) 2014.

  4. Much ado about SEA/SA monitoring: The performance of English Regional Spatial Strategies, and some German comparisons

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanusch, Marie; Glasson, John

    Strategic Environmental Assessment (SEA) seeks to better integrate environmental considerations into the preparation and decision-making process of plans and programmes with a view to promoting sustainable development. Further to application of the European Directive 2001/42/EC (SEA Directive) in 2004, the body of practical SEA experience, and parallel research, has increased steadily. Yet there is a crucial element of SEA which cannot build on much experience but whose importance will grow over time - namely that of SEA monitoring. The paper explores the application of SEA monitoring for English Regional Spatial Strategies (RSSs). It briefly introduces the role of SEA monitoringmore » and its legal requirements, the English approach of integrating SEA into Sustainability Appraisal (SA) and the nature of the current English Regional Planning context. The main part presents the research findings and discusses how practitioners cope with the challenges of SEA/SA monitoring - with guiding questions: why, what, who, how, when, and with what outcomes? Reflecting that monitoring is just about to start, the paper draws on measures envisaged for monitoring in the SA reports prepared for RSS, and on expert interviews. It identifies monitoring trends and highlights workable approaches as well as shortcomings. For a critical reflection the findings are mirrored briefly with SEA monitoring approaches of German Regional Plans. Although it is still early days for such monitoring, the findings indicate that there is a danger that some of the specific requirements and objectives of SEA/SA monitoring are not fully met, mainly due to insufficient databases, inappropriate institutional conditions and limited personnel and financial resources. Some recommendations are offered in conclusion.« less

  5. Treatment Fidelity Among Family Health Promoters Delivering a Physical Activity and Nutrition Intervention to Immigrant and Refugee Families.

    PubMed

    Bronars, Carrie A; Hanza, Marcelo M; Meiers, Sonja J; Patten, Christi A; Clark, Matthew M; Nigon, Julie A; Weis, Jennifer A; Wieland, Mark L; Sia, Irene G

    2017-04-01

    Lack of treatment fidelity can be an important source of variation affecting the credibility and utility of outcomes from behavioral intervention research. Development and implementation of a well-designed treatment fidelity plan, especially with research involving underserved populations, requires careful conceptualization of study needs in conjunction with what is feasible in the population. The purpose of this article is to review a fidelity-monitoring plan consistent with the National Institutes of Health Behavior Change Consortium guidelines (e.g., design, training, delivery, receipt, and enactment) for an intervention trial designed to improve physical activity and nutrition among immigrant and refugee families. Description of the fidelity monitoring plan is provided and challenges related to monitoring treatment fidelity in a community-based participatory intervention for immigrant and refugee families are discussed.

  6. Incipient fault detection study for advanced spacecraft systems

    NASA Technical Reports Server (NTRS)

    Milner, G. Martin; Black, Michael C.; Hovenga, J. Mike; Mcclure, Paul F.

    1986-01-01

    A feasibility study to investigate the application of vibration monitoring to the rotating machinery of planned NASA advanced spacecraft components is described. Factors investigated include: (1) special problems associated with small, high RPM machines; (2) application across multiple component types; (3) microgravity; (4) multiple fault types; (5) eight different analysis techniques including signature analysis, high frequency demodulation, cepstrum, clustering, amplitude analysis, and pattern recognition are compared; and (6) small sample statistical analysis is used to compare performance by computation of probability of detection and false alarm for an ensemble of repeated baseline and faulted tests. Both detection and classification performance are quantified. Vibration monitoring is shown to be an effective means of detecting the most important problem types for small, high RPM fans and pumps typical of those planned for the advanced spacecraft. A preliminary monitoring system design and implementation plan is presented.

  7. Groundwater monitoring well assessment final work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less

  8. Towards a global terrestrial species monitoring program

    USGS Publications Warehouse

    Schmeller, Dirk S.; Julliard, Romain; Bellingham, Peter J.; Böhm, Monika; Brummitt, Neil; Chiarucci, Alessandro; Couvet, Denis; Elmendorf, Sarah; Forsyth, David M.; Moreno, Jaime García; Gregory, Richard D.; Magnusson, William E.; Martin, Laura J.; McGeoch, Melodie A.; Mihoub, Jean-Baptiste; Pereira, Henrique M.; Proença, Vânia; van Swaay, Chris A.M.; Yahara, Tetsukazu; Belnap, Jayne

    2015-01-01

    Introduction: The Convention for Biological Diversity’s (CBD) Strategic Plan for Biodiversity 2011-2020 envisions that “By 2050, biodiversity is valued, conserved, restored and wisely used, maintaining ecosystem services, sustaining a healthy planet and delivering benefits essential for all people.” Although 193 parties have adopted these goals, there is little infrastructure in place to monitor global biodiversity trends. Recent international conservation policy requires such data to be up-to-date, reliable, comparable among sites, relevant, and understandable; as is becoming obvious from the work plan adopted by the Intergovernmental Panel for Biodiversity and Ecosystem Services (IPBES: www.ipbes.net/; http://tinyurl.com/ohdnknq). In order to meet the five strategic goals of the Strategic Plan for Biodiversity 2011-2020 and its 20 accompanying Aichi Targets for 2020 (www.cbd.int/sp/targets/), advances need to be made in coordinating large-scale biodiversity monitoring and linking these with environmental data to develop a comprehensive Global Observation Network, as is the main idea behind GEOSS the Global Earth Observation System of Systems (Christian 2005)...Here we identify ten requirements important for the successful implementation of a global biodiversity monitoring network under the flag of GEO BON and especially a global terrestrial species monitoring program.

  9. Quality of life of coronary artery disease patients after the implementation of planning strategies for medication adherence 1

    PubMed Central

    Lourenço, Laura Bacelar de Araujo; Rodrigues, Roberta Cunha Matheus; São-João, Thaís Moreira; Gallani, Maria Cecilia; Cornélio, Marilia Estevam

    2015-01-01

    OBJECTIVE: to compare the general and specific health-related quality of life (HRQoL) between the Intervention (IG) and Control (CG) groups of coronary artery disease patients after the implementation of Action Planning and Coping Planning strategies for medication adherence and to verify the relationship between adherence and HRQoL. METHOD: this was a controlled and randomized study. RESULTS: the sample (n=115) was randomized into two groups, IG (n=59) and CG (n=56). Measures of medication adherence and general and specific HRQoL were obtained in the baseline and after two months of monitoring. CONCLUSION: the findings showed that the combination of intervention strategies - Action Planning and Coping Planning for medication adherence did not affect the HRQoL of coronary artery disease patients in outpatient monitoring. PMID:25806626

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, K.; Tsai, H.; Decision and Information Sciences

    The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it canmore » be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.« less

  11. ALLOCATION OF MONITORING SITES FOR REGIONAL SURVEYS OF HYDROLOGIC UNITS

    EPA Science Inventory

    In order to characterize the ecological condition of Pacific Northwest watersheds and their aquatic ecosystems, interagency teams have developed the Aquatic and Riparian Effectiveness Monitoring Plan. Monitoring is targeted at the subwatershed scale (6th-field Hydrologic Unit Co...

  12. Development of CMS monitoring procedures : technical summary.

    DOT National Transportation Integrated Search

    1998-04-01

    This research study is concerned with the development of a set of procedures for monitoring congestion using GPS and GIS. These procedures are meant to be used more as a planning tool than for everyday traffic monitoring. Under this assumption, a ser...

  13. 36 CFR 219.30 - Plan documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... overall strategy for maintenance or restoration of sustainability, including desired conditions and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated...

  14. 34 CFR 300.601 - State performance plans and data collection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true State performance plans and data collection. 300.601... Monitoring, Technical Assistance, and Enforcement § 300.601 State performance plans and data collection. (a) General. Not later than December 3, 2005, each State must have in place a performance plan that evaluates...

  15. Northwest Forest Plan–the first 20 years (1994-2013): status and trends of late-successional and old-growth forests

    Treesearch

    Raymond J. Davis; Janet L. Ohmann; Robert E. Kennedy; Warren B. Cohen; Matthew J. Gregory; Zhiqiang Yang; Heather M. Roberts; Andrew N. Gray; Thomas A. Spies

    2015-01-01

    This is the third in a series of periodic monitoring reports on LSOG or latesuccessional and old-growth (older) forest status trends on federally administered lands since implementation of the Northwest Forest Plan (NWFP or the Plan) in 1994. The objective of this monitoring is to determine if the NWFP is providing for conservation and management of older forests as...

  16. 40 CFR 63.7535 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activities, including, as applicable, calibration checks and required zero and span adjustments. A monitoring...-control periods, or required monitoring system quality assurance or control activities in data averages... data according to this section and the site-specific monitoring plan required by § 63.7505(d). (b) You...

  17. 40 CFR 63.7535 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activities, including, as applicable, calibration checks and required zero and span adjustments. A monitoring...-control periods, or required monitoring system quality assurance or control activities in data averages... data according to this section and the site-specific monitoring plan required by § 63.7505(d). (b) You...

  18. 78 FR 57668 - U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... Monitoring Activities for the Saltstone Disposal Facility at the Savannah River Site, Revision 1 AGENCY... responsibilities for monitoring DOE's waste disposal activities at the Saltstone Disposal Facility (SDF) at the... Monitoring Disposal Actions Taken by the U.S. Department of Energy at the Savannah River Site Saltstone...

  19. 40 CFR 60.5225 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SOURCES Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units Model Rule... monitoring system according to your monitoring plan required under § 60.4880. Additionally: (i) For carrier gas flow rate monitors (for activated carbon injection), during the performance test conducted...

  20. 40 CFR 49.10711 - Federal Implementation Plan for the Astaris-Idaho LLC Facility (formerly owned by FMC Corporation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section, consistent with any averaging period specified for averaging the results of monitoring. Fugitive... beneficial. Monitoring malfunction means any sudden, infrequent, not reasonably preventable failure of the monitoring to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless...

  1. 40 CFR 49.10711 - Federal Implementation Plan for the Astaris-Idaho LLC Facility (formerly owned by FMC Corporation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section, consistent with any averaging period specified for averaging the results of monitoring. Fugitive... beneficial. Monitoring malfunction means any sudden, infrequent, not reasonably preventable failure of the monitoring to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless...

  2. 76 FR 56694 - Approval and Promulgation of Air Quality Implementation Plans; California; Determinations of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... ambient air quality monitoring data for the period preceding the applicable attainment deadline. DATES... and certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data... standard, generally based on air quality monitoring data from the 1987 through 1989 period (section 107(d...

  3. 76 FR 28696 - Approval and Promulgation of Air Quality Implementation Plans; California; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... based on complete, quality-assured and certified ambient air quality monitoring data for 2007-2009... certain air quality monitoring data because they meet the criteria for ozone exceptional events that are... certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data show...

  4. 40 CFR 63.2366 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my monitoring installation... Distribution (Non-Gasoline) Testing and Initial Compliance Requirements § 63.2366 What are my monitoring... controlling storage tanks and low throughput transfer racks, you must submit a monitoring plan according to...

  5. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polagye, Brian

    2014-03-31

    The development of approaches to harness marine and hydrokinetic energy at large-scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under-developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6-meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington.more » The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger-scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe-illuminated stereooptical camera system suitable for studying near-turbine interactions with marine animals. The camera system underwent short-term field testing at the proposed turbine deployment site and a multi-month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near-turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet-mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.« less

  6. Proposal and work plan to calibrate and verify a water-quality model to simulate effects of wastewater discharges to the Red River of the North at drought streamflow near Fargo, North Dakota, and Moorhead, Minnesota

    USGS Publications Warehouse

    Wesolowski, Edwin A.

    2000-01-01

    This report presents a proposal for conducting a water-quality modeling study at drought streamflow, a detailed comprehensive plan for collecting the data, and an annual drought-formation monitoring plan. A 30.8 mile reach of the Red River of the North receives treated wastewater from plants at Fargo, North Dakota, and Moorhead, Minnesota, and streamflow from the Sheyenne River. The water-quality modeling study will evaluate the effects of continuous treated-wastewater discharges to the study reach at drought streamflow. The study will define hydraulic characteristics and reaeration and selected reaction coefficients and will calibrate and verity a model.The study includes collecting synoptic water-quality samples for various types of analyses at a number of sites in the study reach. Dye and gas samples will be collected for traveltime and reaeration measurements. Using the Lagrangian reference frame, synoptic water-quality samples will be collected for analysis of nutrients, chlorophyll a, alkalinity, and carbonaceous biochemical oxygen demand. Field measurements will be made of specific conductance, pH, air and water temperature, dissolved oxygen, and sediment oxygen demand. Two sets of water-quality data will be collected. One data set will be used to calibrate the model, and the other data set will be used to verity the model.The DAFLOW/BLTM models will be used to evaluate the effects of the treated wastewater on the water quality of the river. The model will simulate specific conductance, temperature, dissolved oxygen, carbonaceous biochemical oxygen demand, total nitrogen (organic, ammonia, nitrite, nitrate), total orthophosphorus, total phosphorus, and phytoplankton as chlorophyll a.The work plan identifies and discusses the work elements needed for accomplishing the data collection for the study. The work elements specify who will provide personnel, vehicles, instruments, and supplies needed during data collection. The work plan contains instructions for data collection; inventory lists of needed personnel, vehicles, instruments, and supplies; and examples of computations for determining quantities of tracer to be injected into the stream. The work plan also contains an annual drought-formation monitoring plan that includes a 9-month time line that specifies when essential planning actions must occur before actual project start up. Drought streamflows are rare. The annual drought-formation monitoring plan is presented to assist project planning by providing early warning that conditions are favorable to produce drought streamflow. The plan to monitor drought-forming conditions discusses the drought indices to be monitored. To establish a baseline, historic values for some of the drought indices for selected years were reviewed. An annual review of the drought indices is recommended.

  7. Landsat Earth Monitor.

    ERIC Educational Resources Information Center

    Haggerty, James J.

    1979-01-01

    The uses of NASA's Landsat in the areas of cartography, flood control, agricultural inventory, land use mapping, water runoff, urban planning, erosion, geology, and water quality monitoring are illustrated. (BB)

  8. SU-E-T-593: Clinical Evaluation of Direct Aperture Optimization in Head/Neck and Prostate IMRT Treatment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosini, M; GALAL, M; Emam, I

    2014-06-01

    Purpose: To investigate the planning and dosimetric advantages of direct aperture optimization (DAO) over beam-let optimization in IMRT treatment of head and neck (H/N) and prostate cancers. Methods: Five Head and Neck as well as five prostate patients were planned using the beamlet optimizer in Elekta-Xio ver 4.6 IMRT treatment planning system. Based on our experience in beamlet IMRT optimization, PTVs in H/N plans were prescribed to 70 Gy delivered by 7 fields. While prostate PTVs were prescribed to 76 Gy with 9 fields. In all plans, fields were set to be equally spaced. All cases were re-planed using Directmore » Aperture optimizer in Prowess Panther ver 5.01 IMRT planning system at same configurations and dose constraints. Plans were evaluated according to ICRU criteria, number of segments, number of monitor units and planning time. Results: For H/N plans, the near maximum dose (D2) and the dose that covers 95% D95 of PTV has improved by 4% in DAO. For organs at risk (OAR), DAO reduced the volume covered by 30% (V30) in spinal cord, right parotid, and left parotid by 60%, 54%, and 53% respectively. This considerable dosimetric quality improvement achieved using 25% less planning time and lower number of segments and monitor units by 46% and 51% respectively. In DAO prostate plans, Both D2 and D95 for the PTV were improved by only 2%. The V30 of the right femur, left femur and bladder were improved by 35%, 15% and 3% respectively. On the contrary, the rectum V30 got even worse by 9%. However, number of monitor units, and number of segments decreased by 20% and 25% respectively. Moreover the planning time reduced significantly too. Conclusion: DAO introduces considerable advantages over the beamlet optimization in regards to organs at risk sparing. However, no significant improvement occurred in most studied PTVs.« less

  9. 42 CFR 457.700 - Basis, scope, and applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Strategic Planning, Reporting, and Evaluation § 457.700 Basis, scope, and applicability. (a) Statutory basis... strategic planning, reports, and program budgets; and (2) Section 2108 of the Act, which sets forth... strategic planning, monitoring, reporting and evaluation under title XXI. (c) Applicability. The...

  10. 42 CFR 457.700 - Basis, scope, and applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Strategic Planning, Reporting, and Evaluation § 457.700 Basis, scope, and applicability. (a) Statutory basis... strategic planning, reports, and program budgets; and (2) Section 2108 of the Act, which sets forth... strategic planning, monitoring, reporting and evaluation under title XXI. (c) Applicability. The...

  11. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM: AGROECOSYSTEM 1992 PILOT PLAN

    EPA Science Inventory

    The Agroecosystem Resource Group (ARG) of the Environmental Protection Monitoring and Assessment Program (EMAP) has developed a five year program strategy for implementation of a suite of indicators for monitoring agroecosystem status and trends. he five-year period (1991-1995) i...

  12. 40 CFR 63.562 - Standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... barrels per day; and (C) For 1997, 1,445,000 barrels per day. (ii) Maximum extent practicable means that... (thermocouples, pressure transducers, continuous emissions monitors (CEMS), etc.) variances. (i) The plan shall... monitoring equipment functions properly and variances of the control equipment and monitoring equipment are...

  13. Mental Health

    MedlinePlus

    ... usando el icono . Ver Mas Recursos Digital Tools Social Media Facebook Twitter Instagram YouTube Planning and Management Strategy & Planning Monitoring & Evaluation Social Media Policies Digital Government Strategy Virtual Office Hours Virtual ...

  14. The Differential Effects of Collaborative vs. Individual Prewriting Planning on Computer-Mediated L2 Writing: Transferability of Task-Based Linguistic Skills in Focus

    ERIC Educational Resources Information Center

    Amiryousefi, Mohammad

    2017-01-01

    The current study aimed at investigating the effects of three types of prewriting planning conditions, namely teacher-monitored collaborative planning (TMCP), student-led collaborative planning (SLCP), and individual planning (IP) on EFL learners' computer-mediated L2 written production and learning transfer from a pedagogic task to a new task of…

  15. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This Monitoring Report describes groundwater monitoring for the property at Ramona, Kansas, on which a grain storage facility was formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The monitoring was implemented on behalf of the CCC/USDA by Argonne National Laboratory. Monitoring was conducted as specified in the Long-Term Groundwater Monitoring Plan (Argonne 2012) approved by the Kansas Department of Health and Environment (KDHE 2012).

  17. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  18. Ethical considerations in adherence research.

    PubMed

    Patel, Nupur U; Moore, Blake A; Craver, Rebekah F; Feldman, Steven R

    2016-01-01

    Poor adherence to treatment is a common cause of medical treatment failure. Studying adherence is complicated by the potential for the study environment to impact adherence behavior. Studies performed without informing patients about adherence monitoring must balance the risks of deception against the potential benefits of the knowledge to be gained. Ethically monitoring a patient's adherence to a treatment plan without full disclosure of the monitoring plan requires protecting the patient's rights and upholding the fiduciary obligations of the investigator. Adherence monitoring can utilize different levels of deception varying from stealth monitoring, debriefing after the study while informing the subject that some information had been withheld in regard to the use of adherence monitoring (withholding), informed consent that discloses some form of adherence monitoring is being used and will be disclosed at the end of the study (authorized deception), and full disclosure. Different approaches offer different benefits and potential pitfalls. The approach used must balance the risk of nondisclosure against the potential for confounding the adherence monitoring data and the potential benefits that adherence monitoring data will have for the research subjects and/or other populations. This commentary aims to define various methods of adherence monitoring and to provide a discussion of the ethical considerations that accompany the use of each method and adherence monitoring in general as it is used in clinical research.

  19. The Design and Development of an Intelligent Planning Aid

    DTIC Science & Technology

    1986-07-01

    reasons why widening the scope of TACPLAK’s applicability make sense. First# plan execution and monitoring (and the re-planning that then occurs) are...Orsssnu, contracting officer’s representative I», KKY voees o Decision Making Tactical Planning Taxonomy Problem Solving ii M ifrntitr *r MM* I...planning aid. It documents the development of a decision- making , planning, and decision-aiding analytical framework comprising a set of models, s generic

  20. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    USGS Publications Warehouse

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  1. Evaluating barnyard Best Management Practices in Wisconsin using upstream-downstream monitoring

    USGS Publications Warehouse

    Stuntebeck, Todd D.

    1995-01-01

    The Nonpoint Source Water Pollution Abatement Program was created in 1978 by the Wisconsin Legislature. The goal of the program is to improve and protect the water quality of lakes, streams, wetlands, and ground water within selected priority watersheds by controlling sources of nonpoint pollution. For each selected watershed, the Wisconsin Department of Natural Resources drafts a management plan that guides the implementation of pollution-control strategies known as Best Management Practices (BMP's). This plan summarizes resource and land-use inventories, describes the results of pollution-source modeling, and suggests pollution reduction goals. The U.S. Geological Survey, through a cooperative effort with the Wisconsin Department of Natural Resources, is monitoring water-quality improvements that result from the implementation of BMP's. The data collected are then compared to the watershed plans to assess progress and determine whether goals are being realized. This fact sheet describes the data-collection efforts, preliminary results, and planned data-analysis techniques of monitoring projects for pre-BMP conditions at two barnyards, one each on Otter Creek and Halfway Prairie Creek.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Dick; Tsosie, Bernadette

    Groundwater samples were collected from monitoring wells at the Bluewater, New Mexico, Disposal Site to monitor groundwater contaminants as specified in the 1997 Long-Term Surveillance Plan for the DOE Bluewater (UMTRCA Title II) Disposal Site Near Grants, New Mexico (LTSP). Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). A duplicate sample was collected from location 16(SG).

  3. Apollo/Saturn 5 consolidated instrumentation plan for AS-511 (Apollo 16)

    NASA Technical Reports Server (NTRS)

    Clark, D. E.

    1972-01-01

    The consolidated instrumentation plan, for employing optical and electronic data acquisition systems to monitor the performance and trajectory of Apollo Saturn 5 vehicle 511 during the launch phase of the mission (prelaunch, liftoff to insertion), is presented. Telemetry, optical, and electronic tracking equipment on board the vehicle and data acquisition systems monitoring the flight are discussed. Flight safety instrumentation, vehicle data transmission systems, and geophysical instrumentation are also described.

  4. Feasibility Investigation on the Development of a Structural Damage Diagnostic and Monitoring System for Rocket Engines

    NASA Technical Reports Server (NTRS)

    Shen, Ji Y.; Sharpe, Lonnie, Jr.

    1998-01-01

    The research activity for this project is mainly to investigate the necessity and feasibility to develop a structural health monitoring system for rocket engines, and to carry out a research plan for further development of the system. More than one hundred technical papers have been searched and reviewed during the period. We concluded after this investigation that adding a new module in NASA's existing automated diagnostic system to monitor the healthy condition of rocket engine structures is a crucial task, and it's possible to develop such a system based upon the vibrational-based nondestructive damage assessment techniques. A number of such techniques have been introduced. Their advantages and disadvantages are also discussed. A global research plan has been figured out. As the first step of the overall research plan, a proposal for the next fiscal year has been submitted.

  5. HIV Treatment Overview

    MedlinePlus

    ... usando el icono . Ver Mas Recursos Digital Tools Social Media Facebook Twitter Instagram YouTube Planning and Management Strategy & Planning Monitoring & Evaluation Social Media Policies Digital Government Strategy Virtual Office Hours Virtual ...

  6. 40 CFR 230.96 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required for aquatic resources with slow development rates (e.g., forested wetlands, bogs). Following..., and may include plans (such as as-built plans), maps, and photographs to illustrate site conditions...

  7. 33 CFR 332.6 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...., forested wetlands, bogs). Following project implementation, the district engineer may reduce or waive the... performance standards, and may include plans (such as as-built plans), maps, and photographs to illustrate...

  8. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a...

  9. Comprehensive College Plan for 2000-2001.

    ERIC Educational Resources Information Center

    San Antonio Coll., TX.

    The document describes San Antonio College's (Texas) strategic goals and objectives for 2000-2001. San Antonio College's comprehensive planning and evaluation process monitors the achievement of college-wide goals and initiatives supporting the college's Vision and Mission Statement and the Alamo Community College District's Strategic Plan. The…

  10. 14 CFR § 1216.302 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... responsible for overseeing and guiding NASA's integration of NEPA into the Agency's planning and decision... NEPA analysis into Agency planning and decision-making processes. The SEO shall monitor this process to... Agency's planning and decision making for all NASA activities. The HQ/EMD provides advice and...

  11. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a...

  12. 30 CFR 784.23 - Operation plan: Maps and plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waste storage area; (6) Each water diversion, collection, conveyance, treatment, storage and discharge... structure, permanent water impoundment, refuse pile, and coal mine waste impoundment for which plans are...; (12) Location of each water and subsidence monitoring point; (13) Location of each facility that will...

  13. Law Panel in action.

    PubMed

    Odulana, J

    In September 1976 the Africa Regional Council (ARC) of IPPF created a Law Panel to 1) advise the ARC on the emphasis of laws and parenthood programs in the region, 2) investigate legal obstacles to family planning and ways of removing them, 3) institute a monitoring service on laws and court decisions affecting planned parenthood, and 4) prepare a list of lawyers and legal reformers by country. The panel has 1) recommended adoption of an IPPF Central Medical Committee and Central Law Panel statement on sterilization, adolescent fertility control, and the use of medical and auxiliary personnel in family planning services with guidelines for Africa; 2) appointed National Legal Correspondents to carry on the monitoring service mentioned above in 18 countries; and 3) discussed solutions to problems in delivering family planning services with family planning associations in Tanzania, Zambia, Mauritius, Madagascar, and Kenya. Laws governing family planning education and services, marriage, divorce, and maternity benefits in these countries are summarized. In 1978 the panel will hold 2 workshops on law and the status of women.

  14. 77 FR 43196 - Approval and Promulgation of Implementation Plans; North Carolina; 110(a)(1) and (2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... quality monitoring/data system: NCAC 2D.0600, Monitoring, and 2D.0806, Ambient Monitoring and Modeling... protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance of...

  15. 30 CFR 250.282 - Do I have to conduct post-approval monitoring?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Do I have to conduct post-approval monitoring... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and... monitoring? The Regional Supervisor may direct you to conduct monitoring programs. You must retain copies of...

  16. 30 CFR 250.282 - Do I have to conduct post-approval monitoring?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Do I have to conduct post-approval monitoring... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and... monitoring? The Regional Supervisor may direct you to conduct monitoring programs. You must retain copies of...

  17. 30 CFR 250.282 - Do I have to conduct post-approval monitoring?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Do I have to conduct post-approval monitoring... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and... monitoring? The Regional Supervisor may direct you to conduct monitoring programs. You must retain copies of...

  18. Monitoring social indicators in the Bear Trap Canyon Wilderness 1988-1998

    Treesearch

    Joe L. Ashor

    2000-01-01

    Since its inception as a wilderness planning and management tool almost 15 years ago, the Limits of Acceptable Change (LAC) process has stressed the importance of monitoring. Monitoring social conditions is critical to ensure that quality visitor experiences are maintained. Ten years of data collected from monitoring three river corridor-related social indicators in...

  19. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM - AGROECOSYSTEM PILOT FIELD PROGRAM PLAN - 1993

    EPA Science Inventory

    The Agroecosystem Resource Group (ARG) of the Environmental Monitoring and Assessment Program (EMAP) has developed a five-year (1991-1995) strategy for the development, evaluation, and implementation of a suite of indicators for monitoring agroecosystem status and trends on a reg...

  20. 20 CFR 627.475 - Oversight and monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... monitoring. (a) The Secretary may monitor all recipients and subrecipients of financial assistance pursuant... program quality and outcomes meet the objectives of the Act and regulations promulgated thereunder; (2... Coordination and Special Services Plan (GCSSP). (e)(1) The PIC, pursuant to standards established by the...

  1. 49 CFR 110.90 - Grant monitoring, reports, and records retention.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Grant monitoring, reports, and records retention... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS AND OIL TRANSPORTATION HAZARDOUS MATERIALS PUBLIC SECTOR TRAINING AND PLANNING GRANTS § 110.90 Grant monitoring, reports...

  2. Sensing system development for HOV/HOT (high occupancy vehicle) lane monitoring.

    DOT National Transportation Integrated Search

    2011-02-01

    With continued interest in the efficient use of roadways the ability to monitor the use of HOV/HOT lanes is essential for management, planning and operation. A system to reliably monitor these lanes on a continuous basis and provide usage statistics ...

  3. Sensing system development for HOV/HOT (high occupancy vehicle) lane monitoring.

    DOT National Transportation Integrated Search

    2011-02-01

    . : ii : ABSTRACT : With continued interest in the efficient use of roadways the ability to monitor the use of HOV/HOT lanes is essential for management, planning and operation. A system to reliably monitor these lanes on a continuous basis and provi...

  4. 28 CFR 115.113 - Supervision and monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Supervision and monitoring. 115.113... NATIONAL STANDARDS Standards for Lockups Prevention Planning § 115.113 Supervision and monitoring. (a) For... heightened protection, to include continuous direct sight and sound supervision, single-cell housing, or...

  5. 28 CFR 115.113 - Supervision and monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Supervision and monitoring. 115.113... NATIONAL STANDARDS Standards for Lockups Prevention Planning § 115.113 Supervision and monitoring. (a) For... heightened protection, to include continuous direct sight and sound supervision, single-cell housing, or...

  6. 28 CFR 115.113 - Supervision and monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Supervision and monitoring. 115.113... NATIONAL STANDARDS Standards for Lockups Prevention Planning § 115.113 Supervision and monitoring. (a) For... heightened protection, to include continuous direct sight and sound supervision, single-cell housing, or...

  7. Using Fish Tissue Data to Monitor Remedy Effectiveness

    EPA Science Inventory

    Chapter 8 of the Contaminated Sediment Remediation Guidance for Hazardous Waste Sites (OSWER Directive 9355.0-85, December 2005), presents an approach for developing an effective monitoring plan. As stated in the Guidance, one of the goals of monitoring is to “evaluate long-term ...

  8. Analysis of Trinity Power Metrics for Automated Monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michalenko, Ashley Christine

    This is a presentation from Los Alamos National Laboraotyr (LANL) about the analysis of trinity power metrics for automated monitoring. The following topics are covered: current monitoring efforts, motivation for analysis, tools used, the methodology, work performed during the summer, and future work planned.

  9. DynAMo: A Modular Platform for Monitoring Process, Outcome, and Algorithm-Based Treatment Planning in Psychotherapy.

    PubMed

    Kaiser, Tim; Laireiter, Anton Rupert

    2017-07-20

    In recent years, the assessment of mental disorders has become more and more personalized. Modern advancements such as Internet-enabled mobile phones and increased computing capacity make it possible to tap sources of information that have long been unavailable to mental health practitioners. Software packages that combine algorithm-based treatment planning, process monitoring, and outcome monitoring are scarce. The objective of this study was to assess whether the DynAMo Web application can fill this gap by providing a software solution that can be used by both researchers to conduct state-of-the-art psychotherapy process research and clinicians to plan treatments and monitor psychotherapeutic processes. In this paper, we report on the current state of a Web application that can be used for assessing the temporal structure of mental disorders using information on their temporal and synchronous associations. A treatment planning algorithm automatically interprets the data and delivers priority scores of symptoms to practitioners. The application is also capable of monitoring psychotherapeutic processes during therapy and of monitoring treatment outcomes. This application was developed using the R programming language (R Core Team, Vienna) and the Shiny Web application framework (RStudio, Inc, Boston). It is made entirely from open-source software packages and thus is easily extensible. The capabilities of the proposed application are demonstrated. Case illustrations are provided to exemplify its usefulness in clinical practice. With the broad availability of Internet-enabled mobile phones and similar devices, collecting data on psychopathology and psychotherapeutic processes has become easier than ever. The proposed application is a valuable tool for capturing, processing, and visualizing these data. The combination of dynamic assessment and process- and outcome monitoring has the potential to improve the efficacy and effectiveness of psychotherapy. ©Tim Kaiser, Anton Rupert Laireiter. Originally published in JMIR Medical Informatics (http://medinform.jmir.org), 20.07.2017.

  10. Hydrogeologic Modeling for Monitoring, Reporting and Verification of Geologic Sequestration

    NASA Astrophysics Data System (ADS)

    Kolian, M.; De Figueiredo, M.; Lisa, B.

    2011-12-01

    In December 2010, EPA finalized Subpart RR of the Greenhouse Gas (GHG) Reporting Program, which requires facilities that conduct geologic sequestration (GS) of carbon dioxide (CO2) to report GHG data to EPA annually. The GHG Reporting Program requires reporting of GHGs and other relevant information from certain source categories in the United States, and information obtained through Subpart RR will inform Agency decisions under the Clean Air Act related to the use of carbon dioxide capture and sequestration for mitigating GHGs. This paper examines hydrogeologic modeling necessities and opportunities in the context of Subpart RR. Under Subpart RR, facilities that conduct GS by injecting CO2 for long-term containment in subsurface geologic formations are required to develop and implement an EPA-approved site-specific monitoring, reporting, and verification (MRV) plan; and report basic information on CO2 received for injection, annual monitoring activities and the amount of CO2 geologically sequestered using a mass balance approach. The major components of the MRV plan include: identification of potential surface leakage pathways for CO2 and the likelihood, magnitude, and timing, of surface leakage of CO2 through these pathways; delineation of the monitoring areas; strategy for detecting and quantifying any surface leakage of CO2; and the strategy for establishing the expected baselines for monitoring CO2 surface leakage. Hydrogeologic modeling is an integral aspect of the design of an MRV plan. In order to prepare an adequate monitoring program that addresses site specific risks over the full life of the project the MRV plan must reflect the full spatial extent of the free phase CO2 over time. Facilities delineate the maximum area that the CO2 plume is predicted to cover and how monitoring can be phased in over this area. The Maximum Monitoring Area (MMA) includes the extent of the free phase CO2 plume over the lifetime of the project plus a buffer zone of one-half mile. The Active Monitoring Area (AMA) is the area that will be monitored over a specified time interval chosen by the reporter, which must be greater than one year. All of the area in the MMA will eventually be covered by one or more AMAs. This allows operators to phase in monitoring so that during any given time interval, only that part of the MMA in which surface leakage might occur needs to be monitored. EPA designed the MRV plan approach to be site-specific, flexible, and adaptive to future technology developments. This approach allows the reporter to leverage the site characterization, modeling, and monitoring approaches (e.g. monitoring of injection pressures, injection well integrity, groundwater quality and geochemistry, and CO2 plume location, etc.) developed for their Underground Injection Control (UIC) permit. UIC requirements provide the foundation for the safe sequestration of CO2 by helping to ensure that injected fluids remain isolated in the subsurface and away from underground sources of drinking water, thereby serving to reduce the risk of CO2 leakage to the atmosphere.

  11. What Is HIV/AIDS?

    MedlinePlus

    ... usando el icono . Ver Mas Recursos Digital Tools Social Media Facebook Twitter Instagram YouTube Planning and Management Strategy & Planning Monitoring & Evaluation Social Media Policies Digital Government Strategy Virtual Office Hours Virtual ...

  12. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  13. 14 CFR 1216.302 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... overseeing and guiding NASA's integration of NEPA into the Agency's planning and decision making. The SEO... Agency planning and decision-making processes. The SEO shall monitor this process to ensure that these... functions and guiding NASA's integration of NEPA into the Agency's planning and decision making for all NASA...

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2009 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination andmore » determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2009 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2009 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2009 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information.« less

  15. 12 CFR 1291.7 - Monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...' discretion. (iii) Risk factors and other monitoring—(A) Risk factors; other monitoring. A Bank's written monitoring policies shall take into account risk factors such as the amount of AHP subsidy in the project... reasonable risk-based sampling plan to review the back-up project documentation. (2) Reliance on long-term...

  16. 12 CFR 1291.7 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...' discretion. (iii) Risk factors and other monitoring—(A) Risk factors; other monitoring. A Bank's written monitoring policies shall take into account risk factors such as the amount of AHP subsidy in the project... reasonable risk-based sampling plan to review the back-up project documentation. (2) Reliance on long-term...

  17. 40 CFR 130.4 - Water quality monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality monitoring. 130.4 Section 130.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.4 Water quality monitoring. (a) In accordance with section 106(e)(1...

  18. 40 CFR 130.4 - Water quality monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality monitoring. 130.4 Section 130.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.4 Water quality monitoring. (a) In accordance with section 106(e)(1...

  19. 40 CFR 130.4 - Water quality monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality monitoring. 130.4 Section 130.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.4 Water quality monitoring. (a) In accordance with section 106(e)(1...

  20. 76 FR 16795 - The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ....fda.gov/AnimalVeterinary/SafetyHealth/AntimicrobialResistance/NationalAntimicrobialResistanceMonitoringSystem/default.htm , http://www.fda.gov/AnimalVeterinary/SafetyHealth/AntimicrobialResistance/NationalAntimicrobialResistanceMonitoringSystem/ucm062630.htm , http://www.fda.gov/AnimalVeterinary/Safety...

  1. Multi-agent planning and scheduling, execution monitoring and incremental rescheduling: Application to motorway traffic

    NASA Technical Reports Server (NTRS)

    Mourou, Pascal; Fade, Bernard

    1992-01-01

    This article describes a planning method applicable to agents with great perception and decision-making capabilities and the ability to communicate with other agents. Each agent has a task to fulfill allowing for the actions of other agents in its vicinity. Certain simultaneous actions may cause conflicts because they require the same resource. The agent plans each of its actions and simultaneously transmits these to its neighbors. In a similar way, it receives plans from the other agents and must take account of these plans. The planning method allows us to build a distributed scheduling system. Here, these agents are robot vehicles on a highway communicating by radio. In this environment, conflicts between agents concern the allocation of space in time and are connected with the inertia of the vehicles. Each vehicle made a temporal, spatial, and situated reasoning in order to drive without collision. The flexibility and reactivity of the method presented here allows the agent to generate its plan based on assumptions concerning the other agents and then check these assumptions progressively as plans are received from the other agents. A multi-agent execution monitoring of these plans can be done, using data generated during planning and the multi-agent decision-making algorithm described here. A selective backtrack allows us to perform incremental rescheduling.

  2. Sexually Transmitted Diseases (and HIV)

    MedlinePlus

    ... usando el icono . Ver Mas Recursos Digital Tools Social Media Facebook Twitter Instagram YouTube Planning and Management Strategy & Planning Monitoring & Evaluation Social Media Policies Digital Government Strategy Virtual Office Hours Virtual ...

  3. 77 FR 73975 - Information Collection: National Visitor Use Monitoring

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ... cycle with forest planning and other data preparation activities. In addition, the U.S. Department of... data from this collection provides vital information for strategic planning efforts, decisions...

  4. Hydrologic data and description of a hydrologic monitoring plan for Medicine Lake Volcano, California

    USGS Publications Warehouse

    Schneider, Tiffany Rae; McFarland, W.D.

    1996-01-01

    A hydrologic reconnaissance of the Medicine Lake Volcano area was done to collect data needed for the design of a hydrologic monitoring plan. The reconnaissance was completed during two field trips made in June and September 1992, during which geothermal and hydrologic features of public interest in the Medicine Lake area were identified. Selected wells, springs, and geothermal features were located and documented, and initial water-level, discharge, temperature, and specific-conductance measurements were made. Lakes in the study area also were surveyed during the September field trip. Temperature, specific- conductance, dissolved oxygen, and pH data were collected by using a multiparameter probe. The proposed monitoring plan includes measurement of water levels in wells, discharge from springs, and lake stage, as well as analysis of well-,spring-, and lake-water quality. In determining lake-water quality, data for both stratified and unstratified conditions would be considered. (Data for stratified conditions were collected during the reconnaissance phase of this project, but data for unstratified conditions were not.) In addition, lake stage also would be monitored. A geothermal feature near Medicine Lake is a "hot spot" from which hot gases discharge from two distinct vents. Gas chemistry and temperature would be monitored in one of these vents.

  5. Business Center

    EPA Pesticide Factsheets

    Learn how to do business with EPA's Clean Air Markets, including registering to use the Emissions Collection and Monitoring Plan System (ECMPS), the CAMD Business System (CBS), and learn how to submit monitored emissions data.

  6. Monitoring bird populations in small geographic areas

    USGS Publications Warehouse

    Dunn, Erica H.; Bart, J.; Collins, B.T.; Craig, B.; Dale, B.; Downes, C.M.; Francis, C.M.; Woodley, S.; Zorn, P.

    2006-01-01

    Numerous methods exist for monitoring bird populations, and there is a large literature describing them. There are few resources, however, that provide comprehensive advice on every step of organizing and carrying out a survey, from the early stages of planning to final use of the data. Even fewer resources are designed to meet the needs of a wide variety of potential users, from amateurs interested in change of bird life in a local study preserve to professionals testing hypotheses on the response of birds to habitat management, although much of the advice should be the same for every monitoring program. Whether survey objectives are very modest or rigorously scientific, samples must be sufficiently numerous and well distributed to provide meaningful results, and the survey should be well designed to ensure that the money and effort going into it are not wasted. This document is intended to be a complete resource for anyone planning to organize monitoring of noncolonial landbirds within a relatively small geographic area (e.g., from the size of a woodlot to a large park). The first of its two parts provides background explaining the importance of good study design and gives specific advice on all aspects of project planning and execution of high-quality data collection for the purpose of hypothesis testing. The second part is self-contained and nontechnical and describes complete plans for a site-specific checklist survey, suitable for addressing monitoring questions frequently asked by amateurs and for involvement of volunteers in data collection. Throughout are references to additional resources, from background literature to sources of existing survey protocols, analysis software, and tools for archiving data.

  7. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    NASA Astrophysics Data System (ADS)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  8. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1994-10-13

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  9. Tricuspid Atresia

    MedlinePlus

    ... help the delivery team plan treatment. A screening pulse oximeter test usually is done on all newborns right ... and help plan treatment. The tests may include: pulse oximeter monitoring a chest X-ray electrocardiogram (also called ...

  10. Methyl Bromide Fumigant Management Plan Phase 2 Templates

    EPA Pesticide Factsheets

    Templates provide a checklist and framework for elements including certified pesticide applicator details, application block, buffer zones, sign posting, tarp plan, soil conditions, air monitoring, and good agricultural practices (GAPs).

  11. 75 FR 31811 - Endangered and Threatened Wildlife and Plants; Post-Delisting Monitoring Plan for Bald Eagle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-04

    ... Species Act (ESA) requires that we implement a system, in cooperation with the States, to monitor... cooperation with the States, to effectively monitor for not less than 5 years the status of all species that... stratified sampling based on density of identified bald eagle nest sites. Our Bald Eagle Monitoring Team will...

  12. 77 FR 30208 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Baltimore Nonattainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... completeness criteria for 2010 is incorrect. As explained in the TSD, the missing data from the primary monitor..., appendix N. Missing data from a primary monitor at a site does not necessarily mean that the data at the monitoring site is incomplete. When data from a collocated monitor is used to substitute for missing data at...

  13. Saltwater intrusion monitoring in Florida

    USGS Publications Warehouse

    Prinos, Scott T.

    2016-01-01

    Florida's communities are largely dependent on freshwater from groundwater aquifers. Existing saltwater in the aquifers, or seawater that intrudes parts of the aquifers that were fresh, can make the water unusable without additional processing. The quality of Florida's saltwater intrusion monitoring networks varies. In Miami-Dade and Broward Counties, for example, there is a well-designed network with recently constructed short open-interval monitoring wells that bracket the saltwater interface in the Biscayne aquifer. Geochemical analyses of water samples from the network help scientists evaluate pathways of saltwater intrusion and movement of the saltwater interface. Geophysical measurements, collected in these counties, aid the mapping of the saltwater interface and the design of monitoring networks. In comparison, deficiencies in the Collier County monitoring network include the positioning of monitoring wells, reliance on wells with long open intervals that when sampled might provide questionable results, and the inability of existing analyses to differentiate between multiple pathways of saltwater intrusion. A state-wide saltwater intrusion monitoring network is being planned; the planned network could improve saltwater intrusion monitoring by adopting the applicable strategies of the networks of Miami-Dade and Broward Counties, and by addressing deficiencies such as those described for the Collier County network.

  14. Marine spatial planning in practice

    NASA Astrophysics Data System (ADS)

    Collie, Jeremy S.; (Vic) Adamowicz, W. L.; Beck, Michael W.; Craig, Bethany; Essington, Timothy E.; Fluharty, David; Rice, Jake; Sanchirico, James N.

    2013-01-01

    Multiple competing uses of continental-shelf environments have led to a proliferation of marine spatial planning initiatives, together with expert guidance on marine spatial planning. This study provides an empirical review of marine spatial plans, their attributes, and the extent to which the expert guidance is actually being followed. We performed a structured review of 16 existing marine spatial plans and created an idealized marine spatial plan from the steps included in recent expert papers. A cluster analysis of the yes/no answers to 28 questions was used to ordinate the 16 marine spatial plans and to compare them with the idealized plan. All the plans that have been implemented have a high-level government mandate and the authority to implement spatial planning vested in existing institutions. Almost all the plans used data with clear criteria for data inclusion. Stakeholders were included in almost all the plans; they did not participate in all stages of the planning process but their roles were generally clearly defined. Decision-support tools were applied inconsistently across plans and were seldom used dynamically over time. Most spatial planning processes did not select specific outcomes, such as preferred use scenarios. Success is defined inconsistently across plans; in half the cases there are no metrics of success with reference benchmarks. Although monitoring is included in the majority of plans, only in some cases do monitoring results feed back into management decisions. The process of marine spatial planning had advanced in that some of the more recent plans were developed more quickly and contain more desirable attributes than earlier plans. Even so, existing marine spatial plans are heterogeneous—there are essential ingredients, but no single recipe for success.

  15. Quality assurance program plan for radionuclide airborne emissions monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  16. Manifestations of Metacognitive Activity during the Collaborative Planning of Chemistry Practical Investigations

    ERIC Educational Resources Information Center

    Mathabathe, Kgadi Clarrie; Potgieter, Marietjie

    2017-01-01

    This paper elaborates a process followed to characterise manifestations of cognitive regulation during the collaborative planning of chemistry practical investigations. Metacognitive activity was defined as the demonstration of planning, monitoring, control and evaluation of cognitive activities by students while carrying out the chemistry task.…

  17. Restructuring to Sustain Excellence.

    ERIC Educational Resources Information Center

    Myers, Richard S.

    1996-01-01

    The process of restructuring a higher education institution does not end with creation of a strategic plan; the plan's objectives and strategies must be monitored for effectiveness. Phases of creative strategy-making and plan formulation should be alternated with periods of assessment. The process is not a direct course, but dynamic progression…

  18. A Strategic Plan for Introducing, Implementing, Managing, and Monitoring an Urban Extension Platform

    ERIC Educational Resources Information Center

    Warner, Laura A.; Vavrina, Charlie S.; Campbell, Mary L.; Elliott, Monica L.; Northrop, Robert J.; Place, Nick T.

    2017-01-01

    Florida's Strategic Plan for Extension in Metropolitan Regions reflects an adaptive management approach to the state's urban Extension mission within the context of establishing essential elements, performance indicators, key outcomes, and suggested alternatives for action. Extension leadership has adopted the strategic plan, and implementation…

  19. 42 CFR 460.106 - Plan of care.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Services § 460.106 Plan of care. (a) Basic requirement. The interdisciplinary team must promptly develop a... outcomes to be achieved. (c) Implementation of the plan of care. (1) The team must implement, coordinate...) The team must continuously monitor the participant's health and psychosocial status, as well as the...

  20. 42 CFR 460.106 - Plan of care.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Services § 460.106 Plan of care. (a) Basic requirement. The interdisciplinary team must promptly develop a... outcomes to be achieved. (c) Implementation of the plan of care. (1) The team must implement, coordinate...) The team must continuously monitor the participant's health and psychosocial status, as well as the...

  1. 76 FR 43906 - Approval and Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... emissions inventories, monitoring, and modeling, to assure attainment and maintenance of the standards... NAAQS required the deployment of a system of new monitors to measure ambient levels of that new... requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance of...

  2. 40 CFR 63.1334 - Parameter monitoring levels and excursions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... period for the storage vessel. (ii) If the monitoring plan does not specify monitoring a parameter and... semiannually or quarterly. The first semiannual period is the 6-month period starting the date the Notification... period—two excused excursions. (6) For the sixth and all subsequent semiannual periods—one excused...

  3. 40 CFR 130.4 - Water quality monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.4 Water quality monitoring. (a) In accordance with section 106(e)(1...; developing and reviewing water quality standards, total maximum daily loads, wasteload allocations and load... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality monitoring. 130.4...

  4. Section summary: Institutional context, drivers and detectability in REDD+ implementation

    Treesearch

    Patricia Manley

    2013-01-01

    REDD+ and Forest DegradationREDD+ implementation requires two key steps: (1) establish a reference emission level or reference level (RL); and (2) monitor performance against the reference level (RL). A monitoring system must be able to monitor the performance of implementing action plans to reduce emissions....

  5. 40 CFR 75.73 - Recordkeeping and reporting.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... plan shall contain sufficient information on the continuous emission monitoring systems, excepted methodology under § 75.19, or excepted monitoring systems under appendix D or E to this part and the use of data derived from these systems to demonstrate that all the unit's NoX emissions are monitored and...

  6. 40 CFR 75.73 - Recordkeeping and reporting.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan shall contain sufficient information on the continuous emission monitoring systems, excepted methodology under § 75.19, or excepted monitoring systems under appendix D or E to this part and the use of data derived from these systems to demonstrate that all the unit's NoX emissions are monitored and...

  7. 40 CFR 75.73 - Recordkeeping and reporting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan shall contain sufficient information on the continuous emission monitoring systems, excepted methodology under § 75.19, or excepted monitoring systems under appendix D or E to this part and the use of data derived from these systems to demonstrate that all the unit's NoX emissions are monitored and...

  8. 40 CFR 75.73 - Recordkeeping and reporting.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan shall contain sufficient information on the continuous emission monitoring systems, excepted methodology under § 75.19, or excepted monitoring systems under appendix D or E to this part and the use of data derived from these systems to demonstrate that all the unit's NoX emissions are monitored and...

  9. 40 CFR 96.71 - Initial certification and recertification procedures

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  10. 40 CFR 96.71 - Initial certification and recertification procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  11. 40 CFR 96.71 - Initial certification and recertification procedures

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  12. 40 CFR 96.71 - Initial certification and recertification procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  13. Temperate non-breeding surveys - a key to shorebird conservation

    Treesearch

    Sue Thomas

    2005-01-01

    Completion of the United States and Canadian shorebird conservation plans recently identified and prioritized shorebird monitoring, management, and conservation needs in the Western Hemisphere. We present an emerging approach to monitor shorebird use of temperate non-breeding areas under the Program for Regional and International Shorebird Monitoring (PRISM). This...

  14. 40 CFR 130.4 - Water quality monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.4 Water quality monitoring. (a) In accordance with section 106(e)(1...; developing and reviewing water quality standards, total maximum daily loads, wasteload allocations and load... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality monitoring. 130.4...

  15. Monitoring components of GypsES

    Treesearch

    Lukas P. Schaub; F. William Ravlin; Jesse A. Logan; Shelby J. Fleischer

    1991-01-01

    The manager needs tools for assistance in planning and interpreting monitoring systems. We are building a system that designs sampling programs by interpreting data about Gypsy Moth, stand condition and management objectives. The system prioritizes areas within the management unit within budgetary constraints and defines the areas to be monitored. The system proposes...

  16. 78 FR 68831 - Agency Information Collection Activities; Submission to the Office of Management and Budget for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... Early Warning and Intervention Monitoring System AGENCY: Institute of Education Sciences/National Center... Intervention Monitoring System. OMB Control Number: 1850-NEW. Type of Review: New collection. Respondents... planning a two-part evaluation of the Early Warning and Intervention Monitoring System (EWIMS), consisting...

  17. The Air Sensor Citizen Science Toolbox: A Collaboration in Community Air Quality Monitoring and Mapping?

    EPA Science Inventory

    Project GoalDevelop tools Citizen Scientists can use to assist them in conducting environmental monitoringResearch PlanIdentify a citizen science project as a potential pilot study locationEstablish their pollutant monitoring interestsDevelop a sensor package to meet their needs ...

  18. 40 CFR 63.2994 - How do I verify the performance of monitoring equipment?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... monitoring equipment. (2) Conduct a performance evaluation of the continuous monitoring system (CMS...-specific performance evaluation plan, conduct of the performance evaluation, and reporting of performance... 40 Protection of Environment 12 2010-07-01 2010-07-01 true How do I verify the performance of...

  19. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less

  20. Ecosystem restoration: Chapter 4

    USGS Publications Warehouse

    Cullinane Thomas, Catherine M.; Skrabis, K. E.; Gascoigne, William

    2012-01-01

    The Department of the Interior extensively supports―through its mission, policy, programs, and funding― the study, planning, implementation, and monitoring of ecosystem restoration. This commitment is reflected in the Department's FY2011-2016 Strategic Plan.

Top