40 CFR 64.6 - Approval of monitoring.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Approval of monitoring. 64.6 Section 64.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.6 Approval of monitoring. (a) Based on an application that includes the...
40 CFR 64.6 - Approval of monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Approval of monitoring. 64.6 Section 64.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.6 Approval of monitoring. (a) Based on an application that includes the...
40 CFR 64.7 - Operation of approved monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Operation of approved monitoring. 64.7 Section 64.7 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.7 Operation of approved monitoring. (a) Commencement of operation. The...
40 CFR 146.68 - Testing and monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
...; or (iii) Using an alternative method approved by the Director. (3) If a corrosion monitoring program... been a well workover; (2) The bottom-hole cement shall be tested by means of an approved radioactive...
30 CFR 250.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Do I have to conduct post-approval monitoring... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and... monitoring? The Regional Supervisor may direct you to conduct monitoring programs. You must retain copies of...
30 CFR 250.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Do I have to conduct post-approval monitoring... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and... monitoring? The Regional Supervisor may direct you to conduct monitoring programs. You must retain copies of...
30 CFR 250.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Do I have to conduct post-approval monitoring... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and... monitoring? The Regional Supervisor may direct you to conduct monitoring programs. You must retain copies of...
List of Laboratories Approved by EPA for the Fourth Unregulated Contaminant Monitoring Rule (UCMR 4)
This document provides a list of laboratories that met the Unregulated Contaminant Monitoring Rule 4 (UCMR 4) Laboratory Approval Program application and Proficiency Testing (PT) criteria for the methods indicated.
List of Laboratories Approved by EPA for the Third Unregulated Contaminant Monitoring Rule (UCMR 3)
This document provides a list of laboratories that met the Unregulated Contaminant Monitoring Rule 3 (UCMR 3) Laboratory Approval Program application and Proficiency Testing (PT) criteria for the methods indicated.
77 FR 71609 - Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-03
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5603-N-89] Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring AGENCY: Office of the Chief Information Officer, HUD. ACTION...-Help Homeownership Opportunity Program (SHOP) Grant Monitoring. OMB Approval Number: 2506-0157. Form...
Results of Boron, Surfactant, and Cyanide Investigation, Beale AFB, California
1991-07-01
ensure that their discharge does not produce instream toxicity. The Discharger shall carry-out the biotoxicity monitoring program in accordance with...Discharger shall implement the approved biotoxicity monitoring program. d. The Discharger shall submit the results of the biotoxicity monitoring program to
The USEPA Beaches Environmental Assessment and Coastal Health Act (BEACH Act) requires states to develop monitoring and notification programs for recreational waters using approved bacterial indicators. Implementation of an appropriate monitoring program can, under some circumsta...
34 CFR 668.156 - Approved State process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... student's eligibility for Title IV, HEA program funds must apply to the Secretary for approval of that... than a single standardized test; (3) Tutoring in basic verbal and quantitative skills, if appropriate... program completion. (d) A State process must— (1) Monitor on an annual basis each participating...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 9 2014-07-01 2014-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 9 2013-07-01 2013-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 9 2012-07-01 2012-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 9 2011-07-01 2011-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Monitoring. 1940.330 Section 1940.330 Agriculture... REGULATIONS (CONTINUED) GENERAL Environmental Program § 1940.330 Monitoring. (a) FmHA or its successor agency... monitoring of approved projects will ensure that those measures which were identified in the preapproval...
The Role of the State Approving Agency.
ERIC Educational Resources Information Center
Dickinson, Bernell C.
1987-01-01
Discusses the role of the State Approving Agency (SAA) in assisting states with their Veterans Education Programs that originated with the G.I. Bill. SAAs continue to help states by providing monitoring services and advising or consulting as needed. (JOW)
76 FR 46352 - Approval of Noise Compatibility Program for San Diego International, San Diego, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-02
... use of monitoring equipment for enforcement purposes by in-situ measurement of any pre-set noise... by in-situ measurement of any pre-set noise thresholds.); Revise the Noise Exposure Map was approved... Authority under Part 150 were in compliance with applicable requirements. On June 30, 2011, the FAA approved...
Turbidity monitoring at select MDOT construction sites.
DOT National Transportation Integrated Search
2012-06-01
The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...
1991-07-05
This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.
42 CFR 410.142 - CMS process for approving national accreditation organizations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Diabetes Self-Management Training and Diabetes Outcome Measurements § 410.142 CMS process for approving... diabetes to accredit entities to furnish training. (b) Required information and materials. An organization... outpatient diabetes self-management training program and procedures to monitor the correction of those...
42 CFR 410.142 - CMS process for approving national accreditation organizations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Diabetes Self-Management Training and Diabetes Outcome Measurements § 410.142 CMS process for approving... diabetes to accredit entities to furnish training. (b) Required information and materials. An organization... outpatient diabetes self-management training program and procedures to monitor the correction of those...
42 CFR 410.142 - CMS process for approving national accreditation organizations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Diabetes Self-Management Training and Diabetes Outcome Measurements § 410.142 CMS process for approving... diabetes to accredit entities to furnish training. (b) Required information and materials. An organization... outpatient diabetes self-management training program and procedures to monitor the correction of those...
40 CFR 52.2423 - Approval status.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Control Program (bubble) for J.W. Fergusson & Sons, Inc. which EPA had approved on March 4, 1983, is removed from the plan. J.W. Fergusson & Sons, Inc. located in Richmond, Virginia is required to comply... monitored during the 1993 ozone season indicated that a violation of the ozone NAAQS occurred at the Charles...
29 CFR 95.51 - Monitoring and reporting program performance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... performance data from recipients. (Approved by the Office of Management and Budget, Approval Number 1225-0017) ...
Certified In-lined Reference Monitoring on .NET
2006-06-01
Introduction Language -based approaches to computer security have employed two major strategies for enforcing security policies over untrusted programs. • Low...automatically verify IRM’s using a static type-checker. Mobile (MOnitorable BIL with Effects) is an exten- sion of BIL (Baby Intermediate Language ) [15], a...AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES Proceedings of the 2006 Programming Languages and
NASA Astrophysics Data System (ADS)
Swindell, Paul; Doyle, Jon; Roach, Dennis
2017-02-01
The Federal Aviation Administration (FAA) started a research program in structural health monitoring (SHM) in 2011. The program's goal was to understand the technical gaps of implementing SHM on commercial aircraft and the potential effects on FAA regulations and guidance. The program evolved into a demonstration program consisting of a team from Sandia National Labs Airworthiness Assurance NDI Center (AANC), the Boeing Corporation, Delta Air Lines, Structural Monitoring Systems (SMS), Anodyne Electronics Manufacturing Corp (AEM) and the FAA. This paper will discuss the program from the selection of the inspection problem, the SHM system (Comparative Vacuum Monitoring-CVM) that was selected as the inspection solution and the testing completed to provide sufficient data to gain the first approved use of an SHM system for routine maintenance on commercial US aircraft.
WFC3 Cycle 19 Calibration Program
NASA Astrophysics Data System (ADS)
Sabbi, E.; WFC3 Team
2012-03-01
The Cycle 19 WFC3 Calibration Program runs from October 2011 through September 2012 and is designed to measure and monitor the behavior of both the UVIS and IR channels. The program was prepared with the actual usage of WFC3 in mind, to provide the best calibration data and reference les for the approved scientic programs. During Cycle 19 the WFC3 team is using 125 external and 1587 internal orbits of HST time divided in 29 di erent programs, grouped in six categories: Monitor, Photometry, Spectroscopy, Detectors, Flat-elds, and Image Quality
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-01
... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Pulp and Paper Production... FURTHER INFORMATION CONTACT: Learia Williams, Monitoring, Assistance, and Media Programs Division, Office... Production (Renewal). ICR Numbers: EPA ICR Number 1657.07, OMB Control Number 2060-0387. ICR Status: This ICR...
40 CFR 52.1680 - Control strategy: Monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Control strategy: Monitoring and reporting. 52.1680 Section 52.1680 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New York § 52.1680...
18 CFR 430.13 - Protected area permits for new withdrawals.
Code of Federal Regulations, 2012 CFR
2012-04-01
... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...
18 CFR 430.13 - Protected area permits for new withdrawals.
Code of Federal Regulations, 2014 CFR
2014-04-01
... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...
18 CFR 430.13 - Protected area permits for new withdrawals.
Code of Federal Regulations, 2013 CFR
2013-04-01
... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...
18 CFR 430.13 - Protected area permits for new withdrawals.
Code of Federal Regulations, 2011 CFR
2011-04-01
... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...
78 FR 63962 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
...: Scientific research, monitoring or habitat restoration exceptions, state and individual research plans... research, scientific monitoring, and fisheries activities conducted under an approved 4(d) program or plan..., 5 or 20 hours, depending on the research or plan. Burden Hours: 1,760. Needs and Uses: This request...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampledmore » twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) has requested that sitewide monitoring continue at Centralia until a final remedy has been selected (as part of a Corrective Action Study [CAS] evaluation) and implemented for this site. In response to this request, twice-yearly sampling of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for monitoring of the groundwater at Centralia (KDHE 2005a,b) was continued in 2008. The sampling events under this extension of the two-year (2005-2007) monitoring program occurred in March and September 2008 (Argonne 2008b, 2009b). Additional piezometers specifically installed to evaluate the progress of the IM pilot test (PMP1-PMP9; Figure 1.2) were also sampled in 2008; the results of these analyses were reported and discussed separately (Argonne 2009a). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program to address both of the continuing monitoring objectives until a CAS for Centralia is developed (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve previously established (before the pilot test) monitoring points (locations identified in Figure 1.3) and the five outlying pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.4); and (2) Sampling twice yearly at the five pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.4). With the approval of the KDHE (2009), groundwater sampling for analyses of VOCs and selected other geochemical parameters was conducted at Centralia under the interim monitoring program outlined above in April and October 2009. This report documents the findings of the 2009 monitoring events.« less
40 CFR 62.14453 - What must I monitor?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What must I monitor? 62.14453 Section 62.14453 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.; Environmental Science Division
In September 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) initiated periodic sampling of groundwater in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Morrill, Kansas. On the basis of available information, the CCC/USDA believes that one or more third parties operated this facility after termination of the CCC/USDA's lease in 1971. The sampling at Morrill is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE), to monitor levels of carbon tetrachloride contaminationmore » identified in the groundwater at this site (Argonne 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater has been sampled twice yearly for a recommended period of two years. The samples are analyzed for volatile organic compounds (VOCs), as well as for selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling is presently conducted in a network of 12 monitoring wells and 3 private wells (Figure 1.1), at locations approved by the KDHE. The scope of the originally approved monitoring has been expanded to include vegetation sampling (initiated in October 2006) and surface water and stream bed sediment sampling (initiated in March 2007). The analytical results for groundwater sampling events at Morrill in September 2005, March 2006, September 2006, and March 2007 were documented previously (Argonne 2006a, 2007c,e). The results have demonstrated the presence of carbon tetrachloride contamination, at levels exceeding the KDHE Tier 2 Risk-Based Screening Level (5.0 {micro}g/L) for this compound, in a groundwater plume extending generally south-southeastward from the former CCC/USDA facility, toward Terrapin Creek at the south edge of the town. Little clear pattern of change in the concentrations observed at the individual monitoring points and little plume migration have been observed in previous monitoring events. Low levels ({le} 1.3 {micro}g/L) of carbon tetrachloride have persistently been detected at monitoring well MW8S, however, along an intermittent tributary to Terrapin Creek. This observation suggests a possible risk of contamination of the surface waters of the creek. In light of these findings, in 2006 the CCC/USDA recommended expansion of the approved monitoring program to include the collection and analysis of surface water samples along Terrapin Creek (Argonne 2007e). At the request of the KDHE (KDHE 2007a), locations for both surface water and shallow sediment sampling were discussed with the KDHE in January 2007. An addendum to the existing monitoring plan and a standard operating procedure (SOP AGEM-15) for sediment sampling were submitted to the KDHE on the basis of these discussions (Argonne 2007a,b). This report presents the results of groundwater, surface water, and sediment sampling performed at Morrill in October 2007, in accord with the monitoring plan (Argonne 2005b) and the addendum to that plan (Argonne 2007a). To supplement these studies, Argonne also sampled natural vegetation along Terrapin Creek in October 2006, April 2007, and July 2007 for analyses for VOCs. The results of the plant tissue analyses are included in this report. The October 2007 groundwater sampling at Morrill represents the fifth and final monitoring event performed under the recommended two-year monitoring program approved by the KDHE.« less
Annual Reporting of Monitoring at Morrill, Kansas in 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
In September 2005, the CCC/USDA initiated periodic sampling of groundwater, in accord with a program (Argonne 2005b) approved by the KDHE (2005), to monitor carbon tetrachloride concentrations in the groundwater. Under the KDHE-approved monitoring plan (Argonne 2005b), groundwater was sampled twice yearly for VOCs analyses through 2011. During the initial two years of monitoring, analysis for selected geochemical parameters was also conducted to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. Consistently low levels of dissolved oxygen (DO) and oxidation-reduction potential (ORP) at monitoring well MW1D (in the deepest portion of themore » contaminated aquifer) and the presence of chloroform (the primary degradation product of carbon tetrachloride) suggested that some degree of reductive dechlorination was occurring.« less
40 CFR 257.30 - Recordkeeping requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... through 257.12; and (2) Any demonstration, certification, finding, monitoring, testing, or analytical data...) The Director of an approved state program may receive electronic documents only if the state program includes the requirements of 40 CFR Part 3—(Electronic reporting). [44 FR 53460, Sept. 13, 1979, as amended...
40 CFR 233.13 - Memorandum of Agreement with Regional Administrator.
Code of Federal Regulations, 2010 CFR
2010-07-01
... administration and enforcement of the approved program. (3) Provisions addressing EPA and State roles and coordination with respect to compliance monitoring and enforcement activities. (4) Provisions addressing...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... conducting required surveys; capacity to furnish information for use in enforcement activities; monitoring... are at 42 CFR part 489 and those pertaining to activities relating to the survey and certification of... facilities. ++ The Joint Commission's processes and procedures for monitoring an HHA found out of compliance...
40 CFR 62.14454 - How must I monitor the required parameters?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How must I monitor the required parameters? 62.14454 Section 62.14454 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2012 CFR
2012-07-01
... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2014 CFR
2014-07-01
... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...
40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2013 CFR
2013-07-01
... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...
Code of Federal Regulations, 2010 CFR
2010-07-01
... initial evaluation of your continuous opacity monitoring system according to Performance Specification 1 in appendix B of 40 CFR part 60. Complete this evaluation by 180 days after your final compliance... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS...
75 FR 17922 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-08
... Reports for Tuberculosis Program Evaluation (OMB No. 0920-0457 exp. 5/31/2010)--Reinstatement--National... for Tuberculosis Program Evaluation, previously approved under OMB No. 0920-0457 after the 5/31/2010... instructions. To ensure the elimination of tuberculosis in the United States, CDC monitors indicators for key...
78 FR 22267 - Proposed Data Collections Submitted for Public Comment and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-15
... this notice. Proposed Project Aggregate Reports for Tuberculosis Program Evaluation (0920-0457-- Exp. 9... extension of the Aggregate Reports for Tuberculosis Program Evaluation, previously approved under OMB No... instructions. To ensure the elimination of tuberculosis in the United States, CDC monitors indicators for key...
34 CFR 74.51 - Monitoring and reporting program performance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... programs or projects can be readily quantified, this quantitative data should be related to cost data for... information including, when appropriate, analysis, and explanation of cost overruns or high unit costs. (e... requirements of 5 CFR part 1320 when requesting performance data from recipients. (Approved by the Office of...
Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States.
Stepenuck, Kristine F; Genskow, Kenneth D
2018-01-01
A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.
Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States
NASA Astrophysics Data System (ADS)
Stepenuck, Kristine F.; Genskow, Kenneth D.
2018-01-01
A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.
Evaluation of a Non-Invasive Alternative Glucose Monitor System in Patients with Diabetes Mellitus
2008-01-07
Diabetes Mellitus New Protocol Title: Evaluation of a Non-Invasive Alternative Glucose Monitor System in Patients with Diabetes Mellitus PRINCIPAL...Invasive Alternative Glucose Monitor System in Patients with Diabetes Mellitus 5b. GRANT NUMBER Coop Agreement # 05216002 5c. PROGRAM ELEMENT NUMBER...Flexible Medical Systems was approved by the Department of Clinical Investigation at WRAMC in January 2008. FY08 AAMTI funding will support the
40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...
40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...
40 CFR 62.15275 - How do I monitor the injection rate of activated carbon?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How do I monitor the injection rate of activated carbon? 62.15275 Section 62.15275 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements fo...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-12
... devices necessary to collect data on ambient air quality, and programs to enforce the limitations. General...-hour ozone NAAQS, based on the most recent three years of complete, quality assured monitoring data... air quality monitoring data for the 3-year period must meet a data completeness requirement. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... source baseline date (and trigger date) under the PSD program in CNMI for sulfur dioxide, PM 10 and... for new or modified major stationary sources (``New Source Review,'' or NSR), programs for monitoring... 1975, EPA modified part 52 by incorporating specific PSD disapprovals into the applicable subpart for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... forwarded to the Office of Management and Budget (OMB) for review and approval. The nature of the... qualified vessels in the Maritime Security Program Fleet. Applications and amendments are used to select vessels for the fleet. Periodic reporting is used to monitor adherence of contractors to program...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... forwarded to the Office of Management and Budget (OMB) for review and approval. The nature of the... qualified vessels in the Maritime Security Program Fleet. Applications and amendments are used to select vessels for the fleet. Periodic reporting is used to monitor adherence of contractors to program...
2018-03-01
MARCH 2018 FINAL TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED STINFO COPY AIR FORCE RESEARCH LABORATORY INFORMATION...SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) Air Force Research Laboratory/RITA DARPA 525 Brooks Road 675 North Randolph Street Rome...1 3.0 METHODS , ASSUMPTIONS, AND PROCEDURES
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
... Monitoring Branch, Child Nutrition Division, 3101 Park Center Drive, Alexandria, VA 22302. SUPPLEMENTARY... in meals; and meet the nutrition needs of school children within their calorie requirements. These improvements to the school meal programs, largely based on recommendations made by the Institute of Medicine of...
24 CFR 968.215 - Resident and homebuyer participation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... establish a Partnership Process, as defined in § 968.105, to develop, implement and monitor the CIAP. Before... determination of efficiency, economy, and need. After HUD approval of the modernization program, a PHA shall...
30 CFR 950.12 - State program provisions and amendments not approved.
Code of Federal Regulations, 2010 CFR
2010-07-01
... coal from its impurities” within the definition of “coal preparation plant” at Chapter I, section 2(m... baseline surface water data on acidity; (4) Deletion of the locational data requirements for monitoring...
1975-09-01
Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370 Approved for public release...Supported By Commandant of the Marine Corps (Code RD) And Monitored By Personnel and Training Research Programs Psychological Sciences Division...balance 6. Test for effectiveness 7. Search for problems 8. Ascertain solutions 9« Determine alternatives 10. Seek out methods for improvement
New technology planning and approval: critical factors for success.
Haselkorn, Ateret; Rosenstein, Alan H; Rao, Anil K; Van Zuiden, Michele; Coye, Molly J
2007-01-01
The steady evolution of technology, with the associated increased costs, is a major factor affecting health care delivery. In the face of limited capital resources, it is important for hospitals to integrate technology management with the strategic plan, mission, and resource availability of the organization. Experiences in technology management have shown that having a well-organized, consistent approach to technology planning, assessment, committee membership, approval, evaluation, implementation, and monitoring are key factors necessary to ensure a successful program. We examined the results of a survey that assessed the structure, processes, and cultural support behind hospital committees for new technology planning and approval.
Kuppusamy, Vijayalakshmi; Nagarajan, Vivekanandan; Jeevanandam, Prakash; Murugan, Lavanya
2016-02-01
The study was aimed to compare two different monitor unit (MU) or dose verification software in volumetric modulated arc therapy (VMAT) using modified Clarkson's integration technique for 6 MV photons beams. In-house Excel Spreadsheet based monitor unit verification calculation (MUVC) program and PTW's DIAMOND secondary check software (SCS), version-6 were used as a secondary check to verify the monitor unit (MU) or dose calculated by treatment planning system (TPS). In this study 180 patients were grouped into 61 head and neck, 39 thorax and 80 pelvic sites. Verification plans are created using PTW OCTAVIUS-4D phantom and also measured using 729 detector chamber and array with isocentre as the suitable point of measurement for each field. In the analysis of 154 clinically approved VMAT plans with isocentre at a region above -350 HU, using heterogeneity corrections, In-house Spreadsheet based MUVC program and Diamond SCS showed good agreement TPS. The overall percentage average deviations for all sites were (-0.93% + 1.59%) and (1.37% + 2.72%) for In-house Excel Spreadsheet based MUVC program and Diamond SCS respectively. For 26 clinically approved VMAT plans with isocentre at a region below -350 HU showed higher variations for both In-house Spreadsheet based MUVC program and Diamond SCS. It can be concluded that for patient specific quality assurance (QA), the In-house Excel Spreadsheet based MUVC program and Diamond SCS can be used as a simple and fast accompanying to measurement based verification for plans with isocentre at a region above -350 HU. Copyright © 2016 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
...EPA is finalizing rule revisions that modify existing requirements for sources affected by the federally administered emission trading programs including the NOX Budget Trading Program, the Acid Rain Program, and the Clean Air Interstate Rule. EPA is amending its Protocol Gas Verification Program (PGVP) and the minimum competency requirements for air emission testing (formerly air emission testing body requirements) to improve the accuracy of emissions data. EPA is also amending other sections of the Acid Rain Program continuous emission monitoring system regulations by adding and clarifying certain recordkeeping and reporting requirements, removing the provisions pertaining to mercury monitoring and reporting, removing certain requirements associated with a class-approved alternative monitoring system, disallowing the use of a particular quality assurance option in EPA Reference Method 7E, adding two incorporation by references that were inadvertently left out of the January 24, 2008 final rule, adding two new definitions, revising certain compliance dates, and clarifying the language and applicability of certain provisions.
40 CFR 52.582 - Control strategy: Ozone.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategy: Ozone. 52.582 Section 52.582 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...—The Administrator approves the incorporation of the photochemical assessment ambient monitoring system...
75 FR 65995 - Biomass Crop Assistance Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-27
... practices approved through conservation planning would be periodically monitored by USDA to determine the... negative impacts, through reduced purchases of inputs for traditional farming, within a region ranging from... changes in land management associated with the adoption of dedicated biomass energy cropping practices and...
Surviving in Cyberspace: A Game Theoretic Approach
2012-06-01
HOUSE 5b. GRANT NUMBER N /A 5c. PROGRAM ELEMENT NUMBER N /A 6. AUTHOR(S) Charles Kamhoua, Kevin Kwiat, and Joon Park 5d. PROJECT NUMBER 23G4...Road Rome, NY 13441-4505 8. PERFORMING ORGANIZATION REPORT NUMBER N /A 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES... N /A 11. SPONSORING/MONITORING AGENCY REPORT NUMBER AFRL-RI-RS-TP-2012-036 12. DISTRIBUTION AVAILABILITY STATEMENT APPROVED FOR
1998-06-01
foreign nations. AFRL-SN-RS-TR-1998-104 has been reviewed and is approved for publication. APPROVED: GEORGE A. BROST Project Engineer FOR THE...REPORT NUMBER AFRL-SN-RS-TR-1998-104 11. SUPPLEMENTARY NOTES Project Engineer: George Brost , AFRL/SNDR, (315) 330-7669 12a. DISTRIBUTION...program was monitored by Dr. George Brost of Rome Laboratory, Griffiss Air Force Base. We thank Dr. Brost for his constant interest, support and
Teamwork in Task Analysis. Training Manual V
1975-11-01
Research Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370 Approved for public...Corps (Code RD) And Monitored By Personnel and Training Research Programs Psychological Sciences Division Office of Naval Research Contract No...survival in the hidden warfare of the destructive psychological win-lose game. Win-lose behavior stems from individual attitudes and manage- ment climate
9 CFR 145.53 - Terminology and classification; flocks and products.
Code of Federal Regulations, 2011 CFR
2011-01-01
... POULTRY Special Provisions for Waterfowl, Exhibition Poultry, and Game Bird Breeding Flocks and Products... typhoid infection; (vii) All poultry, including exhibition, exotic, and game birds, but excluding... examination monitoring program for game birds acceptable to the Official State Agency and approved by the...
9 CFR 145.53 - Terminology and classification; flocks and products.
Code of Federal Regulations, 2012 CFR
2012-01-01
... POULTRY Special Provisions for Hobbyist and Exhibition Waterfowl, Exhibition Poultry, and Game Bird... typhoid infection; (vii) All poultry, including exhibition, exotic, and game birds, but excluding... examination monitoring program for game birds acceptable to the Official State Agency and approved by the...
9 CFR 145.53 - Terminology and classification; flocks and products.
Code of Federal Regulations, 2010 CFR
2010-01-01
... POULTRY Special Provisions for Waterfowl, Exhibition Poultry, and Game Bird Breeding Flocks and Products... typhoid infection; (vii) All poultry, including exhibition, exotic, and game birds, but excluding... examination monitoring program for game birds acceptable to the Official State Agency and approved by the...
9 CFR 145.53 - Terminology and classification; flocks and products.
Code of Federal Regulations, 2013 CFR
2013-01-01
... POULTRY Special Provisions for Hobbyist and Exhibition Waterfowl, Exhibition Poultry, and Game Bird... typhoid infection; (vii) All poultry, including exhibition, exotic, and game birds, but excluding... examination monitoring program for game birds acceptable to the Official State Agency and approved by the...
9 CFR 145.53 - Terminology and classification; flocks and products.
Code of Federal Regulations, 2014 CFR
2014-01-01
... POULTRY Special Provisions for Hobbyist and Exhibition Waterfowl, Exhibition Poultry, and Game Bird... typhoid infection; (vii) All poultry, including exhibition, exotic, and game birds, but excluding... examination monitoring program for game birds acceptable to the Official State Agency and approved by the...
40 CFR 52.743 - Continuous monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the right to deem an operating permit not federally enforceable. Such a determination will be made... 28, 1989) and will be based upon either; the permit, permit approval procedures or state or local permit requirements which do not conform with the operating permit program requirements or the...
1986-09-01
OF REPORT Approved for public release; distribution 2b DECLASSIFICATION /DOWNGRADING SCHEDULE is unlimited. 4 PERFORMING ORGANIZATION REPORT NUMBER(S...S MONITORING ORGANIZATION REPORT NUMBER(S) 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION (If applicable...ORGAIZATION (If applicable) 8c ADDRESS(Ciry, State, ard ZIPCode) 10 SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK UNIT ELEMENT NO INO NO ACCESSION
40 CFR 64.7 - Operation of approved monitoring.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Operation of approved monitoring. 64.7...) COMPLIANCE ASSURANCE MONITORING § 64.7 Operation of approved monitoring. (a) Commencement of operation. The owner or operator shall conduct the monitoring required under this part upon issuance of a part 70 or 71...
40 CFR 64.7 - Operation of approved monitoring.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Operation of approved monitoring. 64.7...) COMPLIANCE ASSURANCE MONITORING § 64.7 Operation of approved monitoring. (a) Commencement of operation. The owner or operator shall conduct the monitoring required under this part upon issuance of a part 70 or 71...
40 CFR 64.7 - Operation of approved monitoring.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Operation of approved monitoring. 64.7...) COMPLIANCE ASSURANCE MONITORING § 64.7 Operation of approved monitoring. (a) Commencement of operation. The owner or operator shall conduct the monitoring required under this part upon issuance of a part 70 or 71...
40 CFR 64.7 - Operation of approved monitoring.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Operation of approved monitoring. 64.7...) COMPLIANCE ASSURANCE MONITORING § 64.7 Operation of approved monitoring. (a) Commencement of operation. The owner or operator shall conduct the monitoring required under this part upon issuance of a part 70 or 71...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.; Environmental Science Division
2007-06-30
This document reports the results of groundwater monitoring in September 2005 and March 2006 at the grain storage facility formerly operated at Morrill, Kansas, by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). These activities were the first and second twice yearly sampling events of the two-year monitoring program approved by the CCC/USDA and Kansas Department of Health and Environment (KDHE) project managers. The monitoring network sampled in September 2005 consisted of 9 monitoring wells (MW1S-MW5S and MW1D [installed in the mid 1990s] and MW6S-MW8S [installed in 2004]), plus 3 private wells (Isch, Rillinger, and Stone). Themore » groundwater samples collected in this first event were analyzed for volatile organic compounds (VOCs), dissolved hydrogen, and additional groundwater parameters to aid in evaluating the potential for reductive dechlorination processes. After the monitoring in September 2005, Argonne recommended expansion of the initial monitoring network. Previous sampling (August 2004) had already suggested that the initial network was inadequate to delineate the extent of the carbon tetrachloride plume. With the approval of the CCC/USDA and KDHE project managers, the monitoring network was expanded in January 2006 through the installation of 3 additional monitoring wells (MW9S-MW11S). Details of the monitoring well installations are reported in this document. The expanded monitoring network of 12 monitoring wells (MW1S-MW11S and MW1D) and 3 private wells (Isch, Rillinger, and Stone) was sampled in March 2006, the second monitoring event in the planned two-year program. Results of analyses for VOCs showed minor increases or decreases in contaminant levels at various locations but indicated that the leading edge of the contaminant plume is approaching the intermittent stream leading to Terrapin Creek. The groundwater samples collected in March 2006 were also analyzed for additional groundwater parameters to aid in the evaluation of the potential for reductive dechlorination processes. Preliminary screening of groundwater parameters provided inadequate evidence that reductive dechlorination of carbon tetrachloride is taking place at some locations on the former CCC/USDA property. Groundwater levels measured manually in October 2005, March 2006, and June 2006 were used to map the potentiometric surface at Morrill. The results were generally consistent with each other and with previous measurements, indicating a groundwater flow direction to the south-southeast from the former CCC/USDA facility. Data recorders installed in wells MW1S-MW8S in July 2004 are gathering long-term data on the groundwater elevation and gradient. Data downloaded in August 2004, March 2005, October 2005, and June 2006 indicate that two relatively upgradient wells near the former CCC/USDA facility responded distinctly to apparent rainfall/recharge events. In contrast, two downgradient wells south of the former facility showed virtually no response, probably because of the damping influence of the nearby surface drainages and shallow groundwater at their locations. The first two monitoring events of the planned two-year monitoring program for Morrill have demonstrated no clear pattern of changes in carbon tetrachloride concentrations, though the contaminated zone has expanded toward the intermittent stream. Argonne recommends that the monitoring program continue as approved and that surface water samples be collected in future monitoring events (September 2006, March 2007, and September 2007).« less
28 CFR 512.17 - Monitoring approved research projects.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Monitoring approved research projects... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.17 Monitoring approved research projects. The BRRB shall monitor all research projects for compliance with Bureau policies. At a minimum, yearly reviews...
28 CFR 512.17 - Monitoring approved research projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Monitoring approved research projects... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.17 Monitoring approved research projects. The BRRB shall monitor all research projects for compliance with Bureau policies. At a minimum, yearly reviews...
28 CFR 512.17 - Monitoring approved research projects.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Monitoring approved research projects... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.17 Monitoring approved research projects. The BRRB shall monitor all research projects for compliance with Bureau policies. At a minimum, yearly reviews...
Annual report of groundwater monitoring at Centralia, Kansas, in 2010.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twicemore » yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation processes (reductive dechlorination) in the subsurface environment (Argonne 2006, 2007a, 2008a). The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound, in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was talking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) requested that sitewide monitoring continue until a final remedy is selected (as part of a Corrective Action Study [CAS] evaluation) and implemented. In response to this request, the established sampling across the site and additional sampling in the IM pilot test area continued in 2008 (Argonne 2008b, 2009a,b). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program for both the wider site and the IM pilot test area (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve monitoring points across the site (Figure 1.1) and five outlying IM pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.2); and (2) Twice yearly sampling of five IM pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.2). With the approval of the KDHE (2009), the initial groundwater sampling for VOCs and geochemical analyses under the interim monitoring plan outlined above was conducted in 2009 (Argonne 2010). The present report documents the findings of the 2010 monitoring events, conducted on April 5 and September 19-21, 2010.« less
30 CFR 250.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Do I have to conduct post-approval monitoring... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL... conduct post-approval monitoring? After approving your EP, DPP, or DOCD, the Regional Supervisor may...
7 CFR 4280.26 - Administration and operation of the Revolving Loan Fund.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GRANTS Rural Economic Development Loan and Grant Programs § 4280.26 Administration and operation of the... Intermediary must permanently retain all Project review, approval, and monitoring authority and responsibility. This authority and responsibility cannot be delegated to any other person or entity. (b) Up to 10...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
..., Surface Impoundment and Containers (Renewal) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... Emission Standards for Tanks, Surface Impoundment and Containers (40 CFR Part 264, Subpart CC, and 40 CFR..., Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental...
40 CFR 62.14454 - How must I monitor the required parameters?
Code of Federal Regulations, 2014 CFR
2014-07-01
... installed in each baghouse compartment or cell. (7) For negative pressure or induced air FF, the bag leak...) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND... use an air pollution control device that includes a FF and are not demonstrating compliance using PM...
40 CFR 62.14454 - How must I monitor the required parameters?
Code of Federal Regulations, 2013 CFR
2013-07-01
... installed in each baghouse compartment or cell. (7) For negative pressure or induced air FF, the bag leak...) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND... use an air pollution control device that includes a FF and are not demonstrating compliance using PM...
30 CFR 250.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Do I have to conduct post-approval monitoring... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information Post-Approval Requirements for the Ep, Dpp, and Docd § 250.282 Do I have to conduct post-approval monitoring...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-13
...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
2006-12-07
This document reports the results of groundwater sampling in September-October 2005 and March 2006 at the grain storage facility formerly operated at Centralia, Kansas, by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). These activities were the first and second twice yearly sampling events of the two-year monitoring program approved by the CCC/USDA and Kansas Department of Health and Environment (KDHE) project managers. The initial monitoring network sampled in September and October 2005 consisted of six monitoring wells (MW1-MW6) installed in 2004, plus five groundwater piezometers (SB01, SB04, SB05, SB08, SB09) installed in 2002. The combined September-Octobermore » 2005 sampling was the first monitoring event in the planned two-year program for Centralia. The groundwater samples collected in both September and October were analyzed for volatile organic compounds (VOCs), and samples collected in September were analyzed for dissolved hydrogen and additional groundwater parameters to aid in evaluating the potential for reductive dechlorination processes. After the monitoring in September-October 2005, Argonne recommended expansion of the initial monitoring network. Previous sampling (August 2004) had already suggested that this network of six monitoring wells and five piezometers was inadequate to delineate the extent of the carbon tetrachloride plume. With the approval of the CCC/USDA and KDHE project managers, the monitoring network was expanded in January 2006 through the installation of four additional monitoring wells (MW7-MW10) and one new piezometer (SB07R) to replace a damaged piezometer (the former SB07). Details of the monitoring well and piezometer installations are reported in this document. The expanded monitoring network of ten monitoring wells (MW01-MW10) and six piezometers (SB01, SB04, SB05, SB07R, SB08, and SB09) was sampled in March 2006. This March 2006 sampling was the second monitoring event in the planned two-year program. Results of analyses for VOCs showed further increases in contaminant levels and expansion of the carbon tetrachloride plume toward the south and west from the former CCC/USDA facility. The groundwater samples collected in March 2006 were also analyzed for additional groundwater parameters to aid in the evaluation of the potential for reductive dechlorination processes. Preliminary screening of groundwater parameters provided limited evidence that reductive dechlorination of carbon tetrachloride is taking place at some locations on the former CCC/USDA facility. Groundwater levels measured manually in September 2005, March 2006, and June 2006 were used to map the potentiometric surface at Centralia. Overall, these results were consistent with each other and with previous measurements, generally indicating a groundwater flow direction toward the south-southwest from the former CCC/USDA facility. Data recorders installed in wells MW01-MW06 in August 2004 are gathering long-term data on the groundwater elevation and gradient. Data downloaded in March 2005, September 2005, and June 2006 indicate that two wells north and west of the former CCC/USDA facility boundary show distinct, transient and seasonal water level variations. In contrast, two different wells southwest and south of the former facility boundary show virtually no response to the same events. The first two monitoring events of the planned two-year monitoring program for Centralia have demonstrated increased carbon tetrachloride concentrations and lateral expansion of the contaminated zone. Argonne recommends that the CCC/USDA and KDHE project managers consider development and approval of a work plan to expedite the selection and implementation of an active remedial alternative addressing the concentrated areas of groundwater contamination before the end of the two-year monitoring program in 2007.« less
76 FR 75868 - Notice of Request for Extension of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-05
... announces the Rural Business-Cooperative Service's (RBS) intention to request an extension of a currently... requested is vital to RBS for prudent loan servicing, credit decisions, and reasonable program monitoring... the proposed collection of information is necessary for the proper performance of the functions of RBS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
... from the Washington State Department of Ecology (Ecology) to demonstrate that the SIP meets the...; Chapter 43.21 RCW Department of Ecology; Chapter 34.05 RCW Administrative Procedure Act; Chapter 42.30 RCW...) which requires Ecology to provide for or conduct surveillance program that: monitors the quality of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... Protection, State Office Building, 79 Elm Street, Hartford, CT 06106- 1630; the Bureau of Air Quality Control... evaluation of the States' submittals? A. Emission Limits and Other Control Measures B. Ambient Air Quality Monitoring/Data System C. Program for Enforcement of Control Measures D. Interstate Transport E. Adequate...
A Proposed Resident's Operative Case Tracking and Evaluation System.
Sehli, Deema N; Esene, Ignatius N; Baeesa, Saleh S
2016-03-01
Neurosurgery program trainers are continuously searching for new methods to evaluate trainees' competency besides number of cases and training duration. Recently, efforts are made on the development of reliable methods to teach competency and valid methods to measure teaching efficacy. Herein, we propose the "Resident's Operative Case Tracking and Evaluation System" (ROCTES) for the assessment and monitoring of the resident's performance quality during each procedure. We developed a data-based website and smartphone application for neurosurgical attending physicians, residents, and resident review committees in our accredited neurosurgical institutions. ROCTES runs through five steps: Login (Resident), Case Entry, Login (Attending Physician), Case Approval and Evaluation, and Report. The Resident enters each case record under "Case Entry" field and can "save," "edit," or "submit" the case data to the Attending Physician. The latter from the attending physician login profile will be able to "approve and evaluate" the resident's "knowledge," "skills," and "attitude" ranking from 1 to 15 for that particular case; add his comments and then "save," "edit," or "submit" the data, which can be viewed by users as a "report." Program Directors can also "login" to monitor the resident's progress. The implementation of this communication tool should enable the filtering and retrieval of information needed for the better assessment and monitoring of residents' exposure to variety of cases in each training center. This proposed evaluation system will provide a transparent assessment for residency training programs and should convert trainees into competent neurosurgeons. Copyright © 2016 Elsevier Inc. All rights reserved.
Coastwide Reference Monitoring System (CRMS)
2010-01-01
In 1990, the U.S. Congress enacted the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) in response to growing awareness of a land loss crisis in Louisiana. Projects funded by CWPPRA require monitoring and evaluation of project effectiveness, and there is also a need to assess the cumulative effects of all projects to achieve a sustainable coastal environment. In 2003, the Louisiana Office of Coastal Protection and Restoration (OCPR) and the U.S. Geological Survey (USGS) received approval from the CWPPRA Task Force to implement the Coastwide Reference Monitoring System (CRMS) as a mechanism to monitor and evaluate the effectiveness of CWPPRA projects at the project, region, and coastwide levels. The CRMS design implements a multiple reference approach by using aspects of hydrogeomorphic functional assessments and probabilistic sampling. The CRMS program is as dynamic as the coastal habitats it monitors. The program is currently funded through CWPPRA and provides data for a variety of user groups, including resource managers, academics, landowners, and researchers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pytel, K.; Mieleszczenko, W.; Lechniak, J.
2010-03-01
The presented paper contains neutronic and thermal-hydraulic (for steady and unsteady states) calculation results prepared to support annex to Safety Analysis Report for MARIA reactor in order to obtain approval for program of testing low-enriched uranium (LEU) lead test fuel assemblies (LTFA) manufactured by CERCA. This includes presentation of the limits and operational constraints to be in effect during the fuel testing investigations. Also, the scope of testing program (which began in August 2009), including additional measurements and monitoring procedures, is described.
Schermbeck, Rebecca M; Powell, Lisa M
2015-04-23
We compare the Children's Food and Beverage Advertising Initiative's (CFBAI's) April 2014 list of food and beverage products approved to be advertised on children's television programs with the federal Interagency Working Group's nutrition recommendations for such advertised products. Products were assessed by using the nutrients to limit (saturated fat, trans fat, sugar, and sodium) component of the Interagency Working Group's recommendations. Fifty-three percent of the listed products did not meet the nutrition recommendations and, therefore, were ineligible to be advertised. We recommend continued monitoring of food and beverage products marketed to children.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
...Recent EPA gas audit results indicate that some gas cylinders used to calibrate continuous emission monitoring systems on stationary sources do not meet EPA's performance specification. Reviews of stack test reports in recent years indicate that some stack testers do not properly follow EPA test methods or do not correctly calculate test method results. Therefore, EPA is proposing to amend its Protocol Gas Verification Program (PGVP) and the minimum competency requirements for air emission testing (formerly air emission testing body requirements) to improve the accuracy of emissions data. EPA is also proposing to amend other sections of the Acid Rain Program continuous emission monitoring system regulations by adding and clarifying certain recordkeeping and reporting requirements, removing the provisions pertaining to mercury monitoring and reporting, removing certain requirements associated with a class-approved alternative monitoring system, disallowing the use of a particular quality assurance option in EPA Reference Method 7E, adding an incorporation by reference that was inadvertently left out of the January 24, 2008 final rule, and clarifying the language and applicability of certain provisions.
30 CFR 550.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Do I have to conduct post-approval monitoring... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information... monitoring? After approving your EP, DPP, or DOCD, the Regional Supervisor may direct you to conduct...
30 CFR 550.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Do I have to conduct post-approval monitoring... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information... monitoring? After approving your EP, DPP, or DOCD, the Regional Supervisor may direct you to conduct...
30 CFR 550.282 - Do I have to conduct post-approval monitoring?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Do I have to conduct post-approval monitoring... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information... monitoring? After approving your EP, DPP, or DOCD, the Regional Supervisor may direct you to conduct...
-- OAS Intranet -- Sunday 27 May 2018 Approved Program-Budget 2018 Proposed Program-Budget 2018 Approved Program-Budget 2017 Proposed Program-Budget 2017 Approved Program-Budget 2016 Proposed Program -Budget 2016 Approved Program-Budget 2015 Proposed Program-Budget 2015 Approved Program-Budget 2014
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-14
... its Technical System Audit of the CARB PQAO (conducted during Summer 2007), that the combined ambient... findings of EPA's Summer 2007 Technical System Audit of CARB's ambient air monitoring program). \\15\\ See, e... through www.regulations.gov or email. www.regulations.gov is an ``anonymous access'' system, and EPA will...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-11
...) and Cross State Air Pollution Rule (CSAPR or the Transport Rule) On May 12, 2005, EPA published CAIR...) for the purpose of reducing SO 2 and NO X emissions. The monitoring data used to demonstrate the Area... Source Review (NSR) permit programs; Provisions for air pollution modeling; and Provisions for public and...
2015-10-01
Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited The...SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Resear ch and Materiel Command Fort Detrick...DDT) and Medical Device Development Tool (MDDT) programs with case study presentations and question and answer opportunities. Expert Working Groups
76 FR 14606 - Approval and Promulgation of Implementation Plans; South Carolina; 110(a)(1) and (2...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... reward system. As discussed above, Regulation 61-62.3, Air Pollution Episodes, requires that DHEC notify... ``anonymous access'' system, which means EPA will not know your identity or contact information unless you... air quality monitoring/data system. 110(a)(2)(C): Program for enforcement of control measures.\\2\\ \\2...
Sanvido, Olivier; Widmer, Franco; Winzeler, Michael; Bigler, Franz
2005-01-01
Genetically modified plants (GMPs) may soon be cultivated commercially in several member countries of the European Union (EU). According to EU Directive 2001/18/EC, post-market monitoring (PMM) for commercial GMP cultivation must be implemented, in order to detect and prevent adverse effects on human health and the environment. However, no general PMM strategies for GMP cultivation have been established so far. We present a conceptual framework for the design of environmental PMM for GMP cultivation based on current EU legislation and common risk analysis procedures. We have established a comprehensive structure of the GMP approval process, consisting of pre-market risk assessment (PMRA) as well as PMM. Both programs can be distinguished conceptually due to principles inherent to risk analysis procedures. The design of PMM programs should take into account the knowledge gained during approval for commercialization of a specific GMP and the decisions made in the environmental risk assessments (ERAs). PMM is composed of case-specific monitoring (CSM) and general surveillance. CSM focuses on anticipated effects of a specific GMP. Selection of case-specific indicators for detection of ecological exposure and effects, as well as definition of effect sizes, are important for CSM. General surveillance is designed to detect unanticipated effects on general safeguard subjects, such as natural resources, which must not be adversely affected by human activities like GMP cultivation. We have identified clear conceptual differences between CSM and general surveillance, and propose to adopt separate frameworks when developing either of the two programs. Common to both programs is the need to put a value on possible ecological effects of GMP cultivation. The structure of PMM presented here will be of assistance to industry, researchers, and regulators, when assessing GMPs during commercialization.
Analysis of the Education Program Approval Process: A Program Evaluation.
ERIC Educational Resources Information Center
Fountaine, Charles A.; And Others
A study of the education program approval process involving the Veterans Administration (VA) and the State Approving Agencies (SAAs) had the following objectives: to describe the present education program approval process; to determine time and costs associated with the education program approval process; to describe the approval process at…
40 CFR 282.73 - Minnesota State-Administered Program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...
40 CFR 282.73 - Minnesota State-Administered Program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...
40 CFR 282.73 - Minnesota State-Administered Program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...
40 CFR 282.73 - Minnesota State-Administered Program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.73 Minnesota State-Administered Program. (a) The State of Minnesota's underground storage tank program is approved in... chapter. EPA approved the Minnesota underground storage tank program on November 30, 2001, and approval...
Motamed, C; Bourgain, J-L
2009-04-01
As part of a quality assurance in the anaesthesia department, this study was designed to enhance the rate of neuromuscular blockade monitoring for patients receiving muscle relaxant during anaesthesia. After approval of our local ethical committee, we assessed 200 computerized anaesthesia records in which neuromuscular relaxants were used. The following data were collected: demographic characteristics, durations of anaesthesia and surgery, use of neuromuscular monitoring, reversal agents and the quality of neuromuscular monitoring. The results were discussed with all anaesthesia providers of the department and an internal guideline was elaborated with the endpoint that all patients having muscle relaxants should have quantitative neuromuscular monitoring. Six months later, another assessment of 200 consecutive records collected the same data to check the efficiency of the elaborated guideline. The monitoring rate was of 67% at the first assessment and increased to 94% (p<0.05). The reversal rate was at 48% in the first assessment and was stable at the second assessment (50%). The rate of patients not monitored and not reversed decreased from 5 to 2% (p<0.05). This study shows that as part of a quality assurance program systematic quantitative monitoring of neuromuscular blockade can be significantly increased.
Fusion Genes Predict Prostate Cancer Recurrence
2017-10-01
we will develop a training program centered on genomics and cell culturing methods to train new investigators to carry out research in benign urologic...Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution...MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland
Requirements For Security Sector Reform Success
2016-05-26
Advanced Military Studies United States Army Command and General Staff College Fort Leavenworth, Kansas 2016 Approved for public release...ACRONYM(S) School of Advanced Military Studies , Advanced Military Studies Program 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION...political and economic stability are required for Security Sector Reform (SSR) success over the long term. This study suggests that states with stable
Measuring energy-saving retrofits: Experiences from the Texas LoanSTAR program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haberl, J.S.; Reddy, T.A.; Claridge, D.E.
1996-02-01
In 1988 the Governor`s Energy Management Center of Texas received approval from the US Department of Energy to establish a $98.6 million state-wide retrofit demonstration revolving loan program to fund energy-conserving retrofits in state, public school, and local government buildings. As part of this program, a first-of-its-kind, statewide Monitoring and Analysis Program (MAP) was established to verify energy and dollar savings of the retrofits, reduce energy costs by identifying operational and maintenance improvements, improve retrofit selection in future rounds of the LoanSTAR program, and initiate a data base of energy use in institutional and commercial buildings located in Texas. Thismore » report discusses the LoanSTAR MAP with an emphasis on the process of acquiring and analyzing data to measure savings from energy conservation retrofits when budgets are a constraint. This report includes a discussion of the program structure, basic measurement techniques, data archiving and handling, data reporting and analysis, and includes selected examples from LoanSTAR agencies. A summary of the program results for the first two years of monitoring is also included.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
...] Notice of Request for Approval of an Information Collection; National Animal Health Monitoring System... to support the National Animal Health Monitoring System Sheep 2011 Study. DATES: We will consider all... Coordinator, at (301) 851-2908. SUPPLEMENTARY INFORMATION: Title: National Animal Health Monitoring System...
Earth observations satellite data policy: Process and outcome
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shaffer, L.R.
1994-12-31
The National Aeronautics and Space Administration (NASA) develops, launches, and operates satellites to observe and monitor the Earth and its environment. This study categorizes each program based on the relationship between NASA and external organizations. A program can be an autonomous mission undertaken for NASA`s own constituency, or it can involve a client agency or a partner. These relationships affect how data policy decisions are made and implemented, and how the valuable output of NASA`s Earth observations satellites is managed. The process in NASA for determining which programs will be approved is very informal. Ideas and concepts surface and reachmore » the consciousness of NASA management; if sufficient support is achieved, a proposal can move to the feasibility study phase and from there become an approved and funded mission. The handling of data can be an important consideration in generating political support for program approval. Autonomous programs tend to have decisions made at lower levels and documented informally or not at all. Data policy is part of routine implementation of programs and does not generally rise to the visibility of the agency head or congressional staff or the Executive Office of the President. Responsibility for data management for autonomous missions is retained at NASA centers. Client programs involve higher level decision makers, and are the subject of political interest because they cross agency boundaries. The data policy process includes presidential statements on data access. As part of the client relationship, NASA often provides resources to the client for data handling and analysis, and shares these responsibilities. Data policy for partner programs is the result of bargaining between the partners, either foreign government agencies or private companies.« less
40 CFR 49.23 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... recertification events. When valid SO2 pounds per hour, NO2 pounds per hour, or NO2 pounds per million Btu... approval. (ii) In the event that the owner or operator is unable to develop the plan required in paragraph... requested by the Regional Administrator. (vii) In the event that a program for parameter monitoring on Units...
40 CFR 49.23 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... recertification events. When valid SO2 pounds per hour, NO2 pounds per hour, or NO2 pounds per million Btu... approval. (ii) In the event that the owner or operator is unable to develop the plan required in paragraph... requested by the Regional Administrator. (vii) In the event that a program for parameter monitoring on Units...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... Monitoring Systems; Approved Mobile Transmitting Units and Communications Service Providers for Use in the... and NOAA-approved VMS communications service providers, please contact the VMS Support Center at... degrees above or below the horizon anywhere on Earth. The GSM/GPRS capability (if activated) gives the...
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.; Swingle, R.; Crapse, K.
2011-01-01
The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less
Powell, Lisa M.
2015-01-01
We compare the Children’s Food and Beverage Advertising Initiative’s (CFBAI’s) April 2014 list of food and beverage products approved to be advertised on children’s television programs with the federal Interagency Working Group’s nutrition recommendations for such advertised products. Products were assessed by using the nutrients to limit (saturated fat, trans fat, sugar, and sodium) component of the Interagency Working Group’s recommendations. Fifty-three percent of the listed products did not meet the nutrition recommendations and, therefore, were ineligible to be advertised. We recommend continued monitoring of food and beverage products marketed to children. PMID:25906434
The Army Materiel Requirements Documents: Qualitative Analysis of Efficiency and Effectiveness
2013-06-30
Business and Public Policy Naval Postgraduate School Approved for public release; distribution is unlimited. Prepared for the Naval Postgraduate...of Business and Public Policy,Monterey,CA,93943 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10...The research presented in this report was supported by the Acquisition Research Program of the Graduate School of Business & Public Policy at the
Database Development for Ocean Impacts: Imaging, Outreach, and Rapid Response
2012-09-30
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Database Development for Ocean Impacts: Imaging, Outreach...Development for Ocean Impacts: Imaging, Outreach, and Rapid Response 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...hoses ( Applied Ocean Physics & Engineering department, WHOI, to evaluate wear and locate in mooring optical cables used in the Right Whale monitoring
2009-12-01
of the Congressionally Directed Medical Research Programs (CDMRP) # PT073804 II. BACKGROUND Unlike the painfully obvious losses seen in Alzheimer ...Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for...AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702
Gaw, Sally; Brooks, Bryan W
2016-04-01
Pharmaceuticals are ubiquitous contaminants in aquatic ecosystems. Adaptive monitoring, assessment, and management programs will be required to reduce the environmental hazards of pharmaceuticals of concern. Potentially underappreciated factors that drive the environmental dose of pharmaceuticals include regulatory approvals, marketing campaigns, pharmaceutical subsidies and reimbursement schemes, and societal acceptance. Sales data for 5 common antidepressants (duloxetine [Cymbalta], escitalopram [Lexapro], venlafaxine [Effexor], bupropion [Wellbutrin], and sertraline [Zoloft]) in the United States from 2004 to 2008 were modeled to explore how environmental hazards in aquatic ecosystems changed after patents were obtained or expired. Therapeutic hazard ratios for Effexor and Lexapro did not exceed 1; however, the therapeutic hazard ratio for Zoloft declined whereas the therapeutic hazard ratio for Cymbalta increased as a function of patent protection and sale patterns. These changes in therapeutic hazard ratios highlight the importance of considering current and future drivers of pharmaceutical use when prioritizing pharmaceuticals for water quality monitoring programs. When urban systems receiving discharges of environmental contaminants are examined, water quality efforts should identify, prioritize, and select target analytes presently in commerce for effluent monitoring and surveillance. © 2015 SETAC.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC
2009-09-01
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less
ICPP environmental monitoring report, CY 1989
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-01-01
Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Assurance (EA) Section of the Environmental Compliance and SIS Operations (EC/SIS) Department. Published in response to DOE Order 5484.1, Chap. 3, this report covers the period from December 20, 1988 through December 19, 1989. The ICPP is responsible for complying with all applicable Federal, State, Local and DOE Rules, Regulations and Orders. Radiological effluent and emissions are regulated by the DOE in accordance with the Derived Concentration Guides (DCGs) as presented in DOE Order 5,400.05, and themore » State of Idaho Maximum Permissible Concentrations (MPCs). The Environmental Protection Agency (EPA) regulates all nonradiological waste resulting from the ICPP operations including all airborne, liquid, and solid waste. The EA Section completed a Quality Assurance (QA) Plan for Environmental Monitoring activities during the third quarter of 1986. QA activities have resulted in the ICPP's implementation of the Environmental Protection Agency rules and guidelines pertaining to the Collection, analyses, and reporting of environmentally related samples. Where no approved methods for analyses existed for radionuclides, currently used methods were submitted for the EPA approval. 17 figs., 11 tabs.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
... Activities; Submission to OMB for Review and Approval; Comment Request; Facility Ground-Water Monitoring... docket, go to www.regulations.gov . Title: Facility Ground-Water Monitoring Requirements (Renewal). ICR.... Abstract: This ICR examines the ground-water monitoring standards for permitted and interim status...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-17
...] Notice of Request for Approval of an Information Collection; National Animal Health Monitoring System... information collection; comment request. SUMMARY: In accordance with the Paperwork Reduction Act of 1995, this... Epidemiologic Investigations, an information collection to support the National Animal Health Monitoring System...
50 CFR 15.26 - Approval of cooperative breeding programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.26 Approval of cooperative breeding programs. Upon receipt of a complete application, the Director... 50 Wildlife and Fisheries 1 2011-10-01 2011-10-01 false Approval of cooperative breeding programs...
ACOSS Eleven (Active Control of Space Structures). Volume 1.
1983-07-01
Dr. Keto Soosaar (617) 258-2575 Project Engineer: Richard Carman (315) 330-3148 Approved for public release; distribution unlimited This research was...the Department of Defense and monitored by the Rome Air Development Center. The program manager is Dr. Keto Soosaar and the project leader for...Scharf, "Covariant Invariant Digital Filters," IEEE Trans. Acoust., Speech, Signal Proc., Vol. ASSP-25, No. 2, April 1977, pp. 143 -151. 55 h
2017-05-25
Wilkinson US Army School of Advanced Military Studies United States Army Command and General Staff College Fort Leavenworth, Kansas 2017 Approved for...SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) Advanced Military Studies Program 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S...adversary’s unconventional threat. To test this framework, this monograph analyzes a case study of how Russia will likely use unconventional forces and
Net-Centric Capability and Improved Battlefield Care: Placing the Doctor in the Battlefield
2007-01-01
5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS...ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER... S ) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES The original document
40 CFR 282.61 - Hawaii State-Administered Program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hawaii State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.61 Hawaii State-Administered Program. (a) The State of Hawaii's underground storage tank program is approved in lieu of the...
7 CFR 205.622 - Review of approved State organic programs.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Administrative State Organic Programs § 205.622 Review of approved State organic programs. The Secretary will review a State organic program... 7 Agriculture 3 2010-01-01 2010-01-01 false Review of approved State organic programs. 205.622...
Raising suspicions with the Food and Drug Administration: detecting misconduct.
Hamrell, Michael R
2010-12-01
The clinical Bioresearch Monitoring (BIMO) oversight program of the US Food and Drug Administration (FDA) assesses the quality and integrity of data submitted to the FDA for new product approvals and human subjects protection during clinical studies. A comprehensive program of on-site inspections and data verification, the BIMO program routinely performs random inspections to verify studies submitted to the FDA to support a marketing application. On occasion the FDA will conduct a directed inspection of a specific site or study to look for problems that may have previously been identified. The inspection of a clinical study sometimes uncovers evidence of research fraud or misconduct and it must be decided how to deal with the investigator and the suspect data. The prevention of [or] decreasing the incidence of fraud and misconduct through monitoring by the sponsor is one way to manage compliance issues and can help prevent misconduct. A training program is another way to manage compliance issues in clinical research. While training does not guarantee quality, it does help to ensure that all individuals involved understand the rules and the consequences of research misconduct.
14 CFR 142.37 - Approval of flight aircrew training program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Aircrew Curriculum and... the Administrator for training program approval. (b) A curriculum approved under SFAR 58 of part 121... application for training program approval must indicate— (1) Which courses are part of the core curriculum and...
Code of Federal Regulations, 2010 CFR
2010-01-01
... the requirements for review of approved State coastal zone management (CZM) programs pursuant to... approved coastal zone management program or a portion of such program; and (d) Withdrawing program approval... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL...
Code of Federal Regulations, 2011 CFR
2011-01-01
... the requirements for review of approved State coastal zone management (CZM) programs pursuant to... approved coastal zone management program or a portion of such program; and (d) Withdrawing program approval... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL...
77 FR 59879 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... Federal Register, the EPA is codifying and incorporating by reference the State's hazardous waste program...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
...] Medicare and Medicaid Programs; Approval of the Accreditation Association for Ambulatory Health Care (AAAHC... announces our decision to approve the Accreditation Association for Ambulatory Health Care (AAAHC) for... Ambulatory Health Care's (AAAHC) current term of approval for their ASC accreditation program expires on...
40 CFR 282.87 - Oregon State-Administered Program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Oregon State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.87 Oregon State-Administered Program. (a) The State of Oregon is approved to administer and enforce an underground storage tank...
40 CFR 282.87 - Oregon State-Administered Program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Oregon State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.87 Oregon State-Administered Program. (a) The State of Oregon is approved to administer and enforce an underground storage tank...
40 CFR 282.87 - Oregon State-Administered Program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Oregon State-Administered Program. 282... (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.87 Oregon State-Administered Program. (a) The State of Oregon is approved to administer and enforce an underground storage tank...
38 CFR 21.9765 - Program of education approval.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...
40 CFR 282.81 - New Mexico State-Administered Program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...
38 CFR 21.9765 - Program of education approval.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...
38 CFR 21.9765 - Program of education approval.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...
38 CFR 21.9765 - Program of education approval.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...
40 CFR 282.81 - New Mexico State-Administered Program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 27 2011-07-01 2011-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...
38 CFR 21.9765 - Program of education approval.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21.9765 Program of education approval. VA may provide educational assistance for pursuit of a program of...
40 CFR 282.81 - New Mexico State-Administered Program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 28 2012-07-01 2012-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...
40 CFR 282.81 - New Mexico State-Administered Program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 28 2013-07-01 2013-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...
40 CFR 282.81 - New Mexico State-Administered Program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 27 2014-07-01 2014-07-01 false New Mexico State-Administered Program... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.81 New Mexico State-Administered Program. (a) The State of New Mexico is approved to administer and enforce an...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...
Recommendations for new monitoring wells at Everest, Kansas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
2007-05-03
On February 15, 2007, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) submitted Recommendations for Remedial Action at Everest, Kansas. Those Recommendations were accepted by the Kansas Department of Health and Environment (KDHE) in a letter to the CCC/USDA dated March 5, 2007. The approved Recommendations document outlines a plan for systematic groundwater sampling and monitoring at Everest to provide data necessary for the critical evaluation of remedial options - including a phytoremediation alternative - for restoration of the groundwater and protection of the surface waters of the intermittent creek at this site. Phase I of themore » KDHE-approved monitoring plan includes the following activities: (1) Groundwater sampling at existing monitoring wells, with analyses for volatile organic compounds (VOCs) and selected biodegradation parameters; (2) Sampling of surface waters along the intermittent creek for VOCs analyses; and (3) Periodic manual measurement and automated recording of groundwater and surface water levels in the vicinity of the intermittent creek. The locations selected for groundwater and surface water sampling and analyses under the approved monitoring program were determined in consultation with the KDHE. As a result of subsequent discussions among representatives of the KDHE, the CCC/USDA, and Argonne regarding the technical program at Everest, the CCC/USDA seeks KDHE approval for the installation of up to four new permanent monitoring wells along the upper reach of the intermittent creek west of the Nigh property, as shown in Figure 1. The proposed new well locations lie progressively downgradient in the anticipated direction of future groundwater and contaminant movement; all of the recommended points lie at least 2,000 ft upgradient, however, of the confirmed area of groundwater discharge to the creek identified near Highway 73. The proposed new wells will supplement the existing network of groundwater and surface water monitoring points identified in the KDHE-approved monitoring plan. The new wells will be sampled in accord with the schedules outlined in the approved plan. The new wells are recommended to address specific investigation needs, as follows: (1) The proposed borings will provide data on the lithologic and hydrogeologic characteristics - and the relative continuity - of the Everest aquifer unit along the upgradient reach of the intermittent creek, where possible implementation of a phytoremediation remedy is under consideration. (2) Installation of the borings will permit the collection of sediments from the aquifer unit for possible physical or hydraulic property analyses. The completed monitoring wells will also facilitate possible future in situ estimation of the aquifer unit's hydraulic properties in this area, as part of the remedy evaluation and development process. (3) The completed new wells will be used to determine the depths to groundwater and the pattern(s) of groundwater flow near the intermittent creek, and hence to predict more accurately the locations of possible groundwater (and contaminant) discharge and the extent of the area amenable to possible phytoremediation. (4) The use of automated groundwater level recorders at the new locations will provide data on the potential range and variability of groundwater levels to be expected in the area near the intermittent creek. (5) Periodic sampling of the recommended wells for VOCs analyses will help to constrain (1) the rate(s) and pathway(s) of contaminant approach toward the intermittent creek (and the area amenable to possible phytoremediation) and (2) the areal extent of the plume as it continues to evolve. The resulting 'early warning' data obtained from this sampling will therefore help to ensure that remedial action can be taken, if necessary, in sufficient time to prevent unacceptable levels of carbon tetrachloride contamination from threatening the identified surface waters of the creek. The well locations shown in Figure 1 were chosen to satisfy the technical objectives above, as well as to minimize disruption (to the extent possible) of the normal agricultural activities in the required investigation area. To accommodate these somewhat conflicting goals, the recommended monitoring points include one new well (PZ1) along the existing waterways west of the Nigh property, one new well (PZ3) along the margin of the farm field southwest of existing well SB63 and northeast of well SB64, and two new wells (PZ2, PZ4) in the fields east of the intermittent creek. The CCC/USDA has contacted the potentially affected landowner and is attempting to negotiate access to the desired well locations. If the necessary access cannot be obtained, a modified distribution of three new monitoring wells, to be located entirely along the existing waterways west and southwest of the Nigh property, is proposed as a possible alternate configuration.« less
Ion Source Development for a Compact Proton Beam Writing System II
2012-02-17
5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) Jeroen van Kan 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ...N/A 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) AOARD, UNIT 45002, APO, AP, 96338-5002 10. SPONSOR/MONITOR’S ACRONYM( S ) AOARD 11...SPONSOR/MONITOR’S REPORT NUMBER( S ) AOARD-114099 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13
Microfabricated Multianalyte Sensor Arrays for Metabolite Monitoring
2005-09-01
Approved for Public Release; Distribution Unlimited The views, opinions and/or findings contained in this report are those of the author( s ) and should not...1-0780 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER Michael V. Pishko, Ph.D. 5e. TASK NUMBER 5f. WORK UNIT NUMBER E-mail: mpishkoc...engr.psu.edu 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Pennsylvania State University University Park, PA
2002-01-01
PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) New...Horizons Diagnostics, Columbia, MD 21045 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR...MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER( S ) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution
Monitoring of approved studies: A difficult tightrope walk by Ethics Committees.
Davis, Sanish
2018-01-01
Continuing review of studies approved by the Ethics Committees (ECs) involves review of the progress of the study, annual reports, protocol deviations/violations, serious adverse event monitoring, and on-site monitoring. International and national regulations and guidelines for continuing review state that it is an opportunity for the EC to be assured that risks to subjects are minimized and is are reasonable in relation to anticipated benefits if any to the subjects and the knowledge it will generate. There are several barriers (e.g. lack of workforce, lack of training of members for conducting onsite review, and poor infrastructure) for ECs to do ongoing review of projects approved by them. Industry is an important stakeholder for the research enterprise in India and strongly advocates that ECs should at a minimum have pragmatic standard operating procedures for continuing review/monitoring of studies initially approved. ECs which deal with larger volume of studies with well-functioning secretariat, appropriately trained EC members and funding should definitely conduct onsite review/monitoring in addition to the ongoing review.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Obtaining approval to conduct a Senior... DEVELOPMENT Senior Executive Service Candidate Development Programs § 412.301 Obtaining approval to conduct a Senior Executive Service candidate development program (SESCDP). (a) An SESCDP is an OPM-approved...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee
2003-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2004-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
10 CFR 851.11 - Development and approval of worker safety and health program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Development and approval of worker safety and health program. 851.11 Section 851.11 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Program Requirements § 851.11 Development and approval of worker safety and health program. (a) Preparation and...
Kesselheim, Aaron S; Wang, Bo; Franklin, Jessica M; Darrow, Jonathan J
2015-09-23
To evaluate the use of special expedited development and review pathways at the US Food and Drug Administration over the past two decades. Cohort study. FDA approved novel therapeutics between 1987 and 2014. Publicly available sources provided each drug's year of approval, their innovativeness (first in class versus not first in class), World Health Organization Anatomic Therapeutic Classification, and which (if any) of the FDA's four primary expedited development and review programs or designations were associated with each drug: orphan drug, fast track, accelerated approval, and priority review. Logistic regression models evaluated trends in the proportion of drugs associated with each of the four expedited development and review programs. To evaluate the number of programs associated with each approved drug over time, Poisson models were employed, with the number of programs as the dependent variable and a linear term for year of approval. The difference in trends was compared between drugs that were first in class and those that were not. The FDA approved 774 drugs during the study period, with one third representing first in class agents. Priority review (43%) was the most prevalent of the four programs, with accelerated approval (9%) the least common. There was a significant increase of 2.6% per year in the number of expedited review and approval programs granted to each newly approved agent (incidence rate ratio 1.026, 95% confidence interval 1.017 to 1.035, P<0.001), and a 2.4% increase in the proportion of drugs associated with at least one such program (odds ratio 1.024, 95% confidence interval 1.006 to 1.043, P=0.009). Driving this trend was an increase in the proportion of approved, non-first in class drugs associated with at least one program for drugs (P=0.03 for interaction). In the past two decades, drugs newly approved by the FDA have been associated with an increasing number of expedited development or review programs. Though expedited programs should be strictly limited to drugs providing noticeable clinical advances, this trend is being driven by drugs that are not first in class and thus potentially less innovative. © Kesselheim et al 2015.
Pesticides in Drinking Water – The Brazilian Monitoring Program
Barbosa, Auria M. C.; Solano, Marize de L. M.; Umbuzeiro, Gisela de A.
2015-01-01
Brazil is the world largest pesticide consumer; therefore, it is important to monitor the levels of these chemicals in the water used by population. The Ministry of Health coordinates the National Drinking Water Quality Surveillance Program (Vigiagua) with the objective to monitor water quality. Water quality data are introduced in the program by state and municipal health secretariats using a database called Sisagua (Information System of Water Quality Monitoring). Brazilian drinking water norm (Ordinance 2914/2011 from Ministry of Health) includes 27 pesticide active ingredients that need to be monitored every 6 months. This number represents <10% of current active ingredients approved for use in the country. In this work, we analyzed data compiled in Sisagua database in a qualitative and quantitative way. From 2007 to 2010, approximately 169,000 pesticide analytical results were prepared and evaluated, although approximately 980,000 would be expected if all municipalities registered their analyses. This shows that only 9–17% of municipalities registered their data in Sisagua. In this dataset, we observed non-compliance with the minimum sampling number required by the norm, lack of information about detection and quantification limits, insufficient standardization in expression of results, and several inconsistencies, leading to low credibility of pesticide data provided by the system. Therefore, it is not possible to evaluate exposure of total Brazilian population to pesticides via drinking water using the current national database system Sisagua. Lessons learned from this study could provide insights into the monitoring and reporting of pesticide residues in drinking water worldwide. PMID:26581345
14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...
14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...
14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...
14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...
14 CFR 61.71 - Graduates of an approved training program other than under this part: Special rules.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Graduates of an approved training program... GROUND INSTRUCTORS Aircraft Ratings and Pilot Authorizations § 61.71 Graduates of an approved training program other than under this part: Special rules. (a) A person who graduates from an approved training...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.; Environmental Science Division
In September 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) initiated periodic sampling of groundwater in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Morrill, Kansas. The sampling at Morrill is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE 2005), to monitor levels of carbon tetrachloride contamination identified in the groundwater at this site (Argonne 2004, 2005a). This report provides results for monitoring events in April and September 2009. Under the KDHE-approvedmore » monitoring plan (Argonne 2005b), groundwater was initially sampled twice yearly for a period of two years (in fall 2005, in spring and fall 2006, and in spring and fall 2007). The samples were analyzed for volatile organic compounds (VOCs), as well as for selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The analytical results for groundwater sampling events at Morrill from September 2005 to October 2008 were documented previously (Argonne 2006a,b, 2007, 2008a,b, 2009). Those results consistently demonstrated the presence of carbon tetrachloride contamination, at levels exceeding the KDHE Tier 2 risk-based screening level of 5.0 {micro}g/L for this compound, in a groundwater plume extending generally south-southeastward from the former CCC/USDA facility, toward Terrapin Creek at the south edge of the town. Low levels ({le} 1.3 {micro}g/L) of carbon tetrachloride were persistently detected at monitoring well MW8S, on the bank of an intermittent tributary to Terrapin Creek. This observation suggested a possible risk of contamination of the surface waters of the creek. That concern is the regulatory driver for ongoing monitoring. In light of the early findings, in 2006 the CCC/USDA recommended expansion of the approved monitoring program to include the collection and analysis of surface water samples along Terrapin Creek (Argonne 2006a). At the request of the KDHE (2007a), locations for both surface water and shallow sediment sampling were discussed with the KDHE in January 2007. An addendum to the existing monitoring plan (Appendix A) and a standard operating procedure (SOP AGEM-15; Appendix B) for sediment sampling were submitted to the KDHE on the basis of these discussions and were subsequently approved (KDHE 2008b). Results of sediment sampling prior to 2009 were reported previously (Argonne 2008a,b; 2009). To supplement the original scope of the monitoring, Argonne also sampled natural vegetation along Terrapin Creek in October 2006, April 2007, and July 2007 for analyses for VOCs. The results of these plant tissue analyses were reported previously (Argonne 2008a, 2009). The April and September 2009 sampling events reported here represent a continuation of the two-year monitoring program, as requested by the KDHE (2007b). The groundwater sampling is presently conducted, in accord with the monitoring plan (Argonne 2005b) and the addendum to that plan (Appendix A in this report), in a network of 12 monitoring wells and 3 private wells (Figure 1.1), at locations approved by the KDHE (2008b). The findings of the April and September 2009 monitoring events at Morrill support the following conclusions: (1) Groundwater flow during the early spring and the later part of this review period was predominantly to the south-southeast, from the vicinity of the former CCC/USDA facility toward Terrapin Creek. In late spring, a slight shift occurred toward more southerly groundwater flow (possibly southwesterly in the immediate vicinity of the intermittent tributary that flows into Terrapin Creek). This shift in the late spring reflected transient seasonal precipitation and recharge that resulted in higher groundwater levels at this time. (2) No significant changes were observed in the levels or distribution of carbon tetrachloride in the groundwater at Morrill during the current review period, or in comparison to the results of the spring and fall 2008 monitoring events. A maximum carbon tetrachloride concentration of 28-30 {micro}g/L was identified in groundwater - at well MW3S - during both the April and September 2009 sampling events. (3) No carbon tetrachloride contamination was detected in surface waters or shallow streambed sediments sampled at five locations along Terrapin Creek, downgradient from the former CCC/USDA facility. (4) Sampling of tree branch tissues from existing trees for VOCs analyses can be an indicator of shallow subsurface groundwater contamination. Detections of carbon tetrachloride in vegetation at the Morrill site to date have been generally consistent with the documented location of the groundwater plume.« less
9 CFR 77.37 - Interstate movement from monitored herds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TUBERCULOSIS Captive Cervids § 77.37 Interstate movement from monitored herds. (a) Qualifications. To be... found negative for tuberculosis at an approved slaughtering establishment or necropsied at an approved... negative for tuberculosis in accordance with requirements for interstate movement. No less than one-half of...
40 CFR 444.12 - Monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... must include requirements to monitor, according to EPA-approved test procedures, each pollutant limited... be accomplished using approved test procedures listed in the table to this paragraph. Most of these test procedures have previously been incorporated by reference at 40 CFR 136.3(a), Table IB. The test...
40 CFR 444.12 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... must include requirements to monitor, according to EPA-approved test procedures, each pollutant limited... be accomplished using approved test procedures listed in the table to this paragraph. Most of these test procedures have previously been incorporated by reference at 40 CFR 136.3(a), Table IB. The test...
9 CFR 77.37 - Interstate movement from monitored herds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... TUBERCULOSIS Captive Cervids § 77.37 Interstate movement from monitored herds. (a) Qualifications. To be... found negative for tuberculosis at an approved slaughtering establishment or necropsied at an approved... negative for tuberculosis in accordance with requirements for interstate movement. No less than one-half of...
9 CFR 77.37 - Interstate movement from monitored herds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... TUBERCULOSIS Captive Cervids § 77.37 Interstate movement from monitored herds. (a) Qualifications. To be... found negative for tuberculosis at an approved slaughtering establishment or necropsied at an approved... negative for tuberculosis in accordance with requirements for interstate movement. No less than one-half of...
9 CFR 77.37 - Interstate movement from monitored herds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... TUBERCULOSIS Captive Cervids § 77.37 Interstate movement from monitored herds. (a) Qualifications. To be... found negative for tuberculosis at an approved slaughtering establishment or necropsied at an approved... negative for tuberculosis in accordance with requirements for interstate movement. No less than one-half of...
9 CFR 77.37 - Interstate movement from monitored herds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... TUBERCULOSIS Captive Cervids § 77.37 Interstate movement from monitored herds. (a) Qualifications. To be... found negative for tuberculosis at an approved slaughtering establishment or necropsied at an approved... negative for tuberculosis in accordance with requirements for interstate movement. No less than one-half of...
AOA Approval of ACGME Internship and Residency Training.
Duffy, Thomas; Martinez, Bulmaro
2011-04-01
Since the 1970s, the American Osteopathic Association (AOA) has provided a means for osteopathic physicians to apply for approval of their postdoctoral training in programs accredited by the Accreditation Council for Graduate Medical Education (ACGME). Osteopathic physicians who trained in ACGME programs need this approval to meet AOA licensure and board certification requirements. The AOA approves ACGME residency training with several different approval processes. Approval of the first year of postdoctoral training occurs through Resolution 42, specialty approval (for specialties in which the first year of training is part of the residency), or federal or military training approval. For residency training, the AOA verifies successful completion of an ACGME training program before approving the training. The AOA is using customer surveys and online applications to improve the review process for applicants.
Intelligence Processor Performance Analysis (IPPA)
1981-07-01
Cantrell SRoger Poland Jim Labout - P.unker Ramo Corporation APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED] uJ OTIC j%-1EC~TE: \\DEC 2 3 1981) A. ROME... Poland F00-;0C09 ýJim ; about -Bunker_-Ramno Corporat io n _____________ I. PIERFOAMIN34FtfoWANIZATION NAME AND AGORISS 10. PROGRAM CLEME~r PROJECT, TASK...software and hardware components L with the rationale for their use to be able to monitor the measurement DD I J N 7 1473 EDITION OF INOV 55 IS OBSSLaTE
76 FR 71119 - Agency Information Collection Activity Under OMB Review
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
...The Federal Transit Administration invites public comment about our intention to request the Office of Management and Budget's (OMB) approval to renew the following information collection: 49 U.S.C. Section 5320--Paul S. Sarbanes Transit in Parks Program. The information collected is to monitor projects and satisfy Congressional requests. The Federal Register notice with a 60-day comment period soliciting comments was published on August 29, 2011 (Citation 76 FR 53714). No comments were received from that notice.
Pyroconvection and Climate Change
2007-01-01
Climate Change 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Research Laboratory,4555 Overlook Avenue SW,Washington,DC,20375 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited
25 CFR 273.17 - Programs approved by Indian Education Committee.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Programs developed or approved by the Indian Education Committee pursuant to this part may, at the option... 25 Indians 1 2011-04-01 2011-04-01 false Programs approved by Indian Education Committee. 273.17... EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...
25 CFR 273.17 - Programs approved by Indian Education Committee.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) Programs developed or approved by the Indian Education Committee pursuant to this part may, at the option... 25 Indians 1 2010-04-01 2010-04-01 false Programs approved by Indian Education Committee. 273.17... EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
... OMB Review; Renewal of a Currently Approved Collection; Reclamation Rural Water Supply Program AGENCY... and Budget (OMB) for review and approval: Reclamation Rural Water Supply Program, OMB Control Number... Supply Program (Rural Water Program) to submit information to allow the Bureau of Reclamation to evaluate...
30 CFR 931.15 - Approval of New Mexico regulatory program amendments.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...
30 CFR 931.15 - Approval of New Mexico regulatory program amendments.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...
30 CFR 931.15 - Approval of New Mexico regulatory program amendments.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...
30 CFR 931.15 - Approval of New Mexico regulatory program amendments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of New Mexico regulatory program..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NEW MEXICO § 931.15 Approval of New Mexico regulatory program amendments. The following is a list of the dates...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
..., animal care and handling, trade and movement, and disease testing; Describe the producer-reported... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0080] Notice of Request for Approval of an Information Collection; National Animal Health Monitoring System...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
...Through this interim final rule, NMFS announces that it partially approves Framework Adjustment 48 to the NE Multispecies Fishery Management Plan (FMP) and implements the approved measures in the regulations. Framework 48 is the first of two parallel and related actions developed by the New England Fishery Management Council (Council) to respond to updated stock status information and to adjust other management measures in the NE multispecies (groundfish) fishery beginning in fishing year (FY) 2013. This action implements new status determination criteria for Gulf of Maine (GOM) cod, Georges Bank (GB) cod, Southern New England/Mid-Atlantic (SNE/MA) yellowtail flounder, and white hake based on new benchmark assessments completed for these stocks in 2012 and 2013. NMFS is approving and implementing updated status determination criteria for white hake through this interim final rule and accepting further comment on this measure since it was not available for comment in the Framework 48 proposed rule. NMFS will publish a subsequent final rule to respond to any comments received, if necessary. Through this action, NMFS has also approved and is implementing the following Framework 48 measures: Elimination of dockside monitoring requirements for the groundfish fishery; lower minimum fish sizes for several groundfish stocks; clarified goals and performance standard for groundfish monitoring programs; revisions to the allocation of GB yellowtail flounder to the scallop fishery; and establishment of sub-annual catch limits (ACLs) of GB yellowtail flounder and SNE/MA windowpane flounder for the scallop and other non- groundfish fisheries. NMFS also approved revisions to recreational and commercial accountability measures (AMs), including amendments to existing AMs for windowpane flounder, ocean pout, and Atlantic halibut, and new ``reactive'' AMs for Atlantic wolffish and SNE/MA winter flounder, to address a remand by the U.S. District Court of Appeals. NMFS disapproved some measures in Framework 48: A provision for cost- sharing of monitoring costs between the industry and NMFS; a provision to delay industry-funded monitoring to FY 2014; finer scale discard rate strata for GB yellowtail flounder; and a provision to remove requirements for groundfish trawlers to stow their gear when transiting closed areas. Through this interim final rule, NMFS also withdraws a proposed correction to the regulations specific to monitoring of the Eastern U.S./Canada quotas, and will be accepting additional public comment on this issue. These measures are necessary to meet the requirements of the FMP and the Magnuson-Stevens Act, most notably preventing overfishing, ensuring that management measures are based on the best available science, and mitigating, to the extent practicable, potential negative economic impacts from reductions in catch limits anticipated for fishing year FY 2013.
Probing the Relativistic Jets of Active Galactic Nuclei with Multiwavelength Monitoring
NASA Technical Reports Server (NTRS)
Marscher, Alan P.; Jorstad, Svetlana G.; Aller, Margo
2005-01-01
The work completed includes the analysis of observations obtained during Cycle 7 (March 2002-February 2003) of the Rossi X-ray Timing Explorer (RXTE). The project was part of a longer-term, continuing program to study the X-ray emission process in blazars and radio galaxies in collaboration with Dr. Ian McHardy (U. of Southampton, UK) and Prof. Thomas Balonek (Colgate U.). The goals of the program are to study the X-ray emission mechanism in blazars and radio galaxies and the relation of the X-ray emission to changes in the relativistic jet. The program includes contemporaneous brightness and linear polarization monitoring at radio and optical wavelengths, total and polarized intensity imaging at at 43 GHz with a resolution of 0.1 milliarcseconds with the VLBA, and well-sampled X-ray light curves obtained from a series of approved RXTE programs. The objects studied in the time period covered by the grant were 3C 120, 3C 279, PKS 1510-089, and 3C 273, all with radio jets containing bright knots that appear to move at superluminal speeds. During RXTE Cycle 7, the project was awarded RXTE time to monitor PKS 1510-089 two times per week, 3C 273 and 3C 279 three times per week, and 3C 120 four times per week. In addition, 3C273 and 3C 279 were observed several times per day during a ten-day period in April 2002. The X-ray data, including those from earlier cycles, were compared with radio measurements obtained in the centimeter-wave band by the monitoring program of Drs. Margo and Hugh Aller at the University of Michigan Radio Astronomy Observatory, monthly imaging observations with the VLBA at 43 GHz, and optical observations obtained at several telescopes around the world.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
... demonstrated noise benefit to noncompatible land uses exposed to noise levels in the yearly day/night average... provision of the Act to approve or disapprove the program within 180 days (other than the use of new or...-day period shall be deemed to be an approval of such program. The Noise Compatibility Program...
14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...
14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...
14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...
14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. Link to an amendment published at 78 FR 67836, Nov. 12, 2013. (a) Each airplane simulator and other training device...
14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...
14 CFR 135.419 - Approved aircraft inspection program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Approved aircraft inspection program. 135...
14 CFR 135.419 - Approved aircraft inspection program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Approved aircraft inspection program. 135...
14 CFR 135.419 - Approved aircraft inspection program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Approved aircraft inspection program. 135...
14 CFR 135.419 - Approved aircraft inspection program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Approved aircraft inspection program. 135...
14 CFR 135.419 - Approved aircraft inspection program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.419 Approved aircraft inspection program. (a... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Approved aircraft inspection program. 135...
Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper
McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.
2016-01-01
In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-28
...EPA is partially approving and partially disapproving a revision to the Oklahoma State Implementation Plan (SIP) submitted by the State of Oklahoma through the Oklahoma Department of Environmental Quality on February 19, 2010, intended to address the regional haze requirements of the Clean Air Act (CAA). In addition, EPA is partially approving and partially disapproving a portion of a revision to the Oklahoma SIP submitted by the State of Oklahoma on May 10, 2007 and supplemented on December 10, 2007 to address the requirements of CAA section 110(a)(2)(D)(i)(II) as it applies to visibility for the 1997 8- hour ozone and 1997 fine particulate matter National Ambient Air Quality Standards. This CAA requirement is intended to prevent emissions from one state from interfering with the visibility programs in another state. EPA is approving certain core elements of the SIP including Oklahoma's: determination of baseline and natural visibility conditions; coordinating regional haze and reasonably attributable visibility impairment; monitoring strategy and other implementation requirements; coordination with states and Federal Land Managers; and a number of NOX, SO2, and PM BART determinations. EPA is finding that Oklahoma's regional haze SIP did not address the sulfur dioxide Best Available Retrofit Technology requirements for six units in Oklahoma in accordance with the Regional Haze requirements, or the requirement to prevent interference with other states' visibility programs. EPA is promulgating a Federal Implementation Plan to address these deficiencies by requiring emissions to be reduced at these six units. This action is being taken under section 110 and part C of the CAA.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
...-Regulatory Organizations; The NASDAQ Stock Market LLC; Order Approving a Proposed Rule Change To Assume... Authority and Supervision September 30, 2013. On July 31, 2013, The NASDAQ Stock Market LLC (``NASDAQ'' or...) Manipulation patterns that monitor solely NASDAQ activity, including patterns that monitor the Exchange's...
The New Drug Conditional Approval Process in China: Challenges and Opportunities.
Yao, Xuefang; Ding, Jinxi; Liu, Yingfang; Li, Penghui
2017-05-01
Our aim was to characterize the newly established new drug conditional approval process in China and discuss the challenges and opportunities with respect to new drug research and development and registration. We examined the new approval program through literature review, law analysis, and data analysis. Data were derived from published materials, such as journal articles, government publications, press releases, and news articles, along with statistical data from INSIGHT-China Pharma Databases, the China Food and Drug Administration website, the Center for Drug Evaluation website, the US Food and Drug Administration website, and search results published by Google. Currently, there is a large backlog of New Drug Applications in China, mainly because of the prolonged review time at the China Food and Drug Administration, resulting in a lag in drug approvals. In 2015, the Chinese government implemented the drug review and registration system reform and tackled this issue through various approaches, such as setting up a drug review fee system, adjusting the drug registration classification, and establishing innovative review pathways, including the conditional approval process. In Europe and the United States, programs comparable to the conditional approval program in China have been well developed. The conditional approval program recently established in China is an expedited new drug approval process that is expected to affect new drug development at home and abroad and profoundly influence the public health and the pharmaceutical industry in China. Like any program in its initial stage, the conditional approval program is facing several challenges, including setting up a robust system, formatting new drug clinical research requirements, and improving the regulatory agency's function for drug review and approval. The program is expected to evolve and improve as part of the government mandate of the drug registration system reform. Copyright © 2017 Elsevier HS Journals, Inc. All rights reserved.
[The Pan American Health Organization's gender equality policy].
2006-02-01
The 46th Directing Council of the Pan American Health Organization (PAHO) approved this past September a document entitled " Proposed PAHO gender equality policy" and urged Member States to implement specific policies accordingly, in collaboration with other government sectors, international organizations, and interested parties from civil society. The approved policy is rooted in principles of gender equality and gender equity, the empowerment of men and women, respect for diversity, and gender mainstreaming. PAHO will integrate and support among its Member States the perspective of gender equality in planning, implementing, monitoring, and evaluating policies, programs, projects, and research. The aim is among other things, to attain the highest possible health and well-being for men and women during their whole life cycle, as well as in all population groups. Hopefully these measures will help propel the Region toward the attainment of true gender equality.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... have a measureable noise benefit to sensitive land uses within the Day-Night Level (DNL) 65 decibel... a provision of the Act to approve or disapprove the program within 180 days (other than the use of... within the 180-day period shall be deemed to be an approval of such program. The submitted program...
40 CFR 52.1019 - Identification of plan-conditional approval.
Code of Federal Regulations, 2013 CFR
2013-07-01
...), (C) only as it relates to the PSD program, (D)(i)(II) only as it relates to the PSD program, (D)(ii), (E)(ii), and (J) only as it relates to the PSD program. This conditional approval is contingent upon... conditionally approved for CAA elements 110(a)(2)(A), (C) only as it relates to the PSD program, (D)(i)(II) only...
40 CFR 52.1019 - Identification of plan-conditional approval.
Code of Federal Regulations, 2014 CFR
2014-07-01
...), (C) only as it relates to the PSD program, (D)(i)(II) only as it relates to the PSD program, (D)(ii), (E)(ii), and (J) only as it relates to the PSD program. This conditional approval is contingent upon... conditionally approved for CAA elements 110(a)(2)(A), (C) only as it relates to the PSD program, (D)(i)(II) only...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-06
... Approved Information Collection for the Energy Efficiency and Conservation Block Grant Program Status... guidance concerning the Energy Efficiency and Conservation Block Grant (EECBG) Program is available for... Conservation Block Grant (EECBG) Program Status Report''; (3) Type of Review: Revision of currently approved...
14 CFR 142.37 - Approval of flight aircrew training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... application for training program approval must indicate— (1) Which courses are part of the core curriculum and... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Approval of flight aircrew training program... TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Aircrew Curriculum and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-10
... adopt and implement a SIP- approved Prevention of Significant Deterioration (PSD) permit program. We are...--Prevention of Significant Deterioration (PSD) Permit Program, PCAPCD Rule 518--Prevention of Significant Deterioration (PSD) Permit Program, and YSAQMD Rule 3.24-- Prevention of Significant Deterioration. The approval...
75 FR 53220 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved municipal solid waste landfill (MSWLF) program. The approved modification allows the State to..., and demonstration (RD&D) permits to be issued to certain municipal solid waste landfills by approved...
40 CFR 52.241 - Interim approval of enhanced inspection and maintenance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California... Act (Pub. L. 104-59), the California SIP is approved as meeting the provisions of section 182(c)(3.... (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision...
Minimizing Reflectivity by Etching Microstructures in Mercury Cadmium Telluride (HgCdTe)
2013-02-01
ARL-TN-0527 February 2013 Approved for public release; distribution unlimited...Approved for public release; distribution unlimited. ii REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden...MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ballinger, Marcel Y.; Gervais, Todd L.; Barnett, J. Matthew
2012-06-05
In 2002, the EPA amended 40 CFR 61 Subpart H and 40 CFR 61 Appendix B Method 114 to include requirements from ANSI/HPS N13.1-1999 Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities for major emission points. Additionally, the WDOH amended the Washington Administrative Code (WAC) 246-247 Radiation protection-air emissions to include ANSI/HPS N13.1-1999 requirements for major and minor emission points when new permitting actions are approved. A result of the amended regulations is the requirement to prepare a written technical basis for the radiological air emission sampling and monitoring program. A keymore » component of the technical basis is the Potential Impact Category (PIC) assigned to an emission point. This paper discusses the PIC assignments for the Pacific Northwest National Laboratory (PNNL) Integrated Laboratory emission units; this revision includes five PIC categories.« less
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2015-05-01
This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measuresmore » from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.« less
Skledar, Susan J.; McKaveney, Teresa P.; Ward, Charles O.; Culley, Colleen M.; Ervin, Kelly C.; Weber, Robert J.
2006-01-01
Objective Establish a 3-year hospital internship within a drug use and disease state management program that would provide doctor of pharmacy students with experiential learning while still completing their classroom studies. Design As paid interns, students engaged in group and individual activities that assessed clinical practice guidelines. Patient monitoring and clinical intervention techniques were learned through prospective evaluation of drug therapy. Students designed evidence-based treatment guidelines and participated in all phases of development, including multidisciplinary approval, implementation, and evaluation stages. Assessment Student competency was continually monitored through direct observation by a preceptor and written examinations. Patient case studies, group discussions, and poster presentations allowed assessment of student growth in knowledge and communication skills. Conclusion The comprehensive structure of this internship provides a broad perspective for understanding the role of the hospital pharmacist in providing pharmaceutical care. Close supervision maximizes student learning potential and fosters a mentoring relationship for both personal and professional growth. PMID:17136188
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 281 [EPA-R10-UST-2011-0097; FRL-9296-1] Oregon: Tentative Approval of State Underground Storage Tank Program: Public Hearing Cancellation AGENCY... application for final approval of its Underground Storage Tank (UST) Program under Subtitle I of the Resource...
18 CFR 740.5 - Review and approval of State applications and programs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...
18 CFR 740.5 - Review and approval of State applications and programs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...
18 CFR 740.5 - Review and approval of State applications and programs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...
18 CFR 740.5 - Review and approval of State applications and programs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...
18 CFR 740.5 - Review and approval of State applications and programs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Review and approval of State applications and programs. 740.5 Section 740.5 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.5 Review and approval of State applications...
40 CFR 282.78 - Nevada State-Administered Program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... chapter. EPA approved the Nevada program on December 24, 1992 and it was effective March 30, 1993. (b... 1976 (RCRA), as amended, 42 U.S.C. 6991 et seq. The state's program, as administered by the Nevada... application for final approval and approved by EPA on December 24, 1992. Copies may be obtained from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
...] Medicare and Medicaid Programs; Application from the Compliance Team for Initial CMS-Approval of its Rural... Compliance Team for initial recognition as a national accrediting organization for rural health clinics (RHCs... Compliance Team's request for initial CMS approval of its RHC accreditation program. This notice also...
45 CFR 1801.31 - Approval of graduate programs by the Foundation.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...
45 CFR 1801.31 - Approval of graduate programs by the Foundation.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...
45 CFR 1801.31 - Approval of graduate programs by the Foundation.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...
45 CFR 1801.31 - Approval of graduate programs by the Foundation.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...
45 CFR 1801.31 - Approval of graduate programs by the Foundation.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Graduate Study § 1801.31 Approval of... nominated for a Truman Scholarship. Factors to be used by the Foundation in considering approval include...
ERIC Educational Resources Information Center
American Association of Medical Record Librarians, Chicago, IL.
These guidelines are for the development and operation of approved programs to prepare medical record technicians. "School Approval" discusses the cooperative roles of the American Medical Association (AMA) Council on Medical Education and the American Association of Medical Record Librarians (AAMRL) in connection with program approval,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, J.G.; Adams, S.M.; Kszos, L.A.
1993-08-01
A modified National Pollutant Discharge Elimination System permit was issued to the Oak Ridge Gaseous Diffusion Plant (now referred to as the Oak Ridge K-25 Site) on September 11, 1986. The Oak Ridge K-25 Site is a former uranium-enrichment production facility, which is currently managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy. As required in Part III (L) of that permit, a plan for the biological monitoring of Mitchell Branch (K-1700 stream) was prepared and submitted for approval to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation [formerly the Tennesseemore » Department of Health and Environment (Loar et al. 1992b)]. The K-25 Site Biological Monitoring and Abatement Program (BMAP) described biomonitoring activities that would be conducted over the duration of the permit. Because it was anticipated that the composition of existing effluent streams entering Mitchell Branch would be altered shortly after the modified permit was issued, sampling of the benthic invertebrate and fish communities (Task 4 of BMAP) was initiated in August and September 1986 respectively.« less
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false Do Tribes/Consortia need Secretarial approval to reallocate funds between programs that the Tribe/Consortium administers under the AFA? 1000.103 Section 1000....103 Do Tribes/Consortia need Secretarial approval to reallocate funds between programs that the Tribe...
49 CFR 381.515 - May the FMCSA remove approved participants from a pilot program?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 5 2010-10-01 2010-10-01 false May the FMCSA remove approved participants from a... § 381.515 May the FMCSA remove approved participants from a pilot program? The Administrator will... with the terms and conditions of the pilot program, or if continued participation is inconsistent with...
Code of Federal Regulations, 2010 CFR
2010-04-01
... approved by us; providers we may approve include, but are not limited to— (A) A public or private... carried out under an individualized program or plan; (4) An individualized education program developed under policies and procedures approved by the Secretary of Education for assistance to States for the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... services approved by us; providers we may approve include, but are not limited to— (A) A public or private... carried out under an individualized program or plan; (4) An individualized education program developed under policies and procedures approved by the Secretary of Education for assistance to States for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
... limitation section (ALS) of their approved maintenance program (Time Limits Manual (TLM), chapters 05-00-01... airplanes used for pilot training. Revise their ALS of their approved maintenance program (TLM chapters 05... limitations section (ALS) of the operators approved maintenance program (reference the Time Limits Manual (TLM...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
... Full Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The EPA is promulgating full approval of the Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating...
10 CFR 851.11 - Development and approval of worker safety and health program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... workers at multi-contractor workplaces. (3) The worker safety and health program must describe how the... may be performed at a covered workplace unless an approved worker safety and health program is in... 10 Energy 4 2010-01-01 2010-01-01 false Development and approval of worker safety and health...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-17
... substituted for missing data. See 40 CFR Part 58, appendix D for network design criteria. EPA has approved the... certified ambient air monitoring data for the 2007-2009 period showing that the areas have monitored attainment of the annual PM 2.5 NAAQS. EPA also evaluated incomplete data from this period from other...
Shimazawa, Rumiko; Ikeda, Masayuki
2016-03-01
Concurrent development and co-approval of a companion diagnostic (CDx) with a corresponding drug is ideal, but often unfeasible. Because of limited exposure to a drug in clinical trials, crucial information on safety is sometimes revealed only after approval. Therefore, a CDx for monitoring/safety is often developed after approval of a corresponding drug. However, regulatory guidance is insufficient if contemporaneous development is not possible, thereby leaving plenty of opportunities for improvement with respect to pharmacovigilance and retrospective validation of the CDx. Furthermore, global harmonization of guidance on how to incorporate new scientific information from retrospective analyses of biomarkers should lead to the establishment of more evidence for the development of CDx for approved drugs.
Contracting in vivo research: what are the issues?
Underwood, Wendy J
2007-07-01
As a result of increasing internal and external pressures, research institutions are using contract research organizations for the conduct of in vivo research. Many issues arise when contracting animal research, including concern regarding animal health and welfare. Each sponsor institution should develop a program for outsourced in vivo research that evaluates and ensures appropriate care and use of research animals. Each sponsoring institution should consider establishing a policy and procedure for how outsourced in vivo studies will be approved, conducted, and monitored. An approved list of contract facilities can be established on the basis of accepted standards for animal care and use. Written contracts should include confidentiality agreements, the delineation of animal ownership, and the expectation to comply with all applicable regulations and guidelines for research animal care and use. Finally, a process for communication of adverse study or animal welfare events should be established. Thorough evaluation of contract organizations will help ensure appropriate research animal care and use.
45 CFR 95.611 - Prior approval conditions.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...
45 CFR 95.611 - Prior approval conditions.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...
45 CFR 95.611 - Prior approval conditions.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...
45 CFR 95.611 - Prior approval conditions.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-GRANT PROGRAMS (PUBLIC ASSISTANCE, MEDICAL ASSISTANCE AND STATE CHILDREN'S HEALTH INSURANCE PROGRAMS... requests for approval which affect only one approving component of HHS (CMS, OCSE, or Children's Bureau... days for major milestones. For Aid to Families with Dependent Children (AFDC) Family Assistance...
Region 7 States Air Quality Monitoring Plans - Iowa
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Missouri
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Nebraska
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Kansas
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false Do Tribes/Consortia need Secretarial approval to redesign BIA programs that the Tribe/Consortium administers under an AFA? 1000.88 Section 1000.88 Indians... in An Afa § 1000.88 Do Tribes/Consortia need Secretarial approval to redesign BIA programs that the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... consider in approving a request for a telework travel test program? 300-90.5 Section 300-90.5 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.5 What factors will GSA consider in approving a request for a...
University of Maryland MRSEC - For Members: Travel
Educational Education Pre-College Programs Homeschool Programs Undergraduate & Graduate Programs Teacher University of Maryland requires pre-approval for all travel. Domestic travel approval requests must be
40 CFR 501.31 - Review and approval procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SLUDGE MANAGEMENT PROGRAM REGULATIONS Program Approval, Revision and Withdrawal § 501.31 Review and... sludge management program within 90 days after receiving a complete program submission. (b) Within 30... questions; and (6) Briefly outline the fundamental aspects of the State's proposed program, and the process...
24 CFR 583.405 - Program changes.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program changes. 583.405 Section... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Administration § 583.405 Program changes. (a) HUD approval. (1) A recipient may not make any significant changes to an approved program without prior HUD...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-23
... (ADEC) in four phases. Phases I-III have been transferred from the EPA to ADEC. In March 2011, ADEC made a submission for approval for a one year extension of the transfer of Phase IV of the APDES program... facilities not previously transferred in Phases I-III. The EPA approved the one year extension for Phase IV...
First Among Equals: Interagency Cooperation in Stability Operations
2016-05-26
Approved for public release; distribution is unlimited REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for...11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for Public Release; Distribution is Unlimited 13... publication or sale of copyrighted images is not permissible ii
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
...-7205 Ventricular Assist Device (Destination Therapy) Facilities. XIII Medicare-Approved Lung JoAnna...-Approved Ventricular Assist Device (Destination Therapy) Facilities, Addendum XIII: Lung Volume Reduction...-Approved Ventricular Assist Device (Destination Therapy) Facilities (January Through March 2011) Addendum...
Code of Federal Regulations, 2010 CFR
2010-07-01
... guides modification of those projects to optimize performance. It includes the selection of appropriate... approved in-lieu fee program that are available for sale prior to being fulfilled in accordance with an approved mitigation project plan. Advance credit sales require an approved in-lieu fee program instrument...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
...'s Base National Pollutant Discharge Elimination System (NPDES) Permitting Program AGENCY... of Maine's Base NPDES Permitting Program in these territories as part of the administrative record to... Maine's base program as EPA approved it in 2001. Thus, the state's program would not include regulation...
40 CFR 282.83 - North Carolina State-Administered Program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (Insofar as .94A(2) subjects certain heating oil tanks and the piping connected to otherwise excluded tanks... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.83 North... an underground storage tank program in lieu of the Federal program under subtitle I of the Resource...
50 CFR 15.21 - General application procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.21 General... purposes only: Scientific research; zoological breeding or display programs; cooperative breeding programs...) A person wishing to obtain a permit under this subpart or approval of cooperative breeding programs...
50 CFR 15.21 - General application procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.21 General... purposes only: Scientific research; zoological breeding or display programs; cooperative breeding programs...) A person wishing to obtain a permit under this subpart or approval of cooperative breeding programs...
42 CFR 413.75 - Direct GME payments: General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-based providers for the costs of approved residency programs in medicine, osteopathy, dentistry, and... participates in an approved medical residency program, including programs in osteopathy, dentistry, and... programs in osteopathy, dentistry, and podiatry, as required in order to become certified by the...
7 CFR 1700.55 - Telecommunications Program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...
7 CFR 1700.55 - Telecommunications Program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...
7 CFR 1700.55 - Telecommunications Program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...
7 CFR 1700.55 - Telecommunications Program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...
7 CFR 1700.55 - Telecommunications Program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...
CROMERR Compliance for the Publicly Owned Treatment Works Pretreatment Program
Memorandum to Pretreatment Authorities who are CROMERR applicants about obligations to follow National Pretreatment Program requirements and CROMERR procedures when applying for, approving and incorporating CROMERR practices into an approved POTW program.
Code of Federal Regulations, 2014 CFR
2014-04-01
... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...
Code of Federal Regulations, 2011 CFR
2011-04-01
... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...
Code of Federal Regulations, 2012 CFR
2012-04-01
... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...
Code of Federal Regulations, 2013 CFR
2013-04-01
... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...
Code of Federal Regulations, 2010 CFR
2010-04-01
... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING PROGRAM Approval and Disapproval of Housing Counseling Agencies § 214.100 General. An organization may be approved by HUD as a HUD-approved housing counseling agency upon meeting the requirements of § 214.103 and...
24 CFR 582.405 - Program changes.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program changes. 582.405 Section... DEVELOPMENT COMMUNITY FACILITIES SHELTER PLUS CARE Administration § 582.405 Program changes. (a) Changes. HUD must approve, in writing, any significant changes to an approved program. Significant changes that...
49 CFR 452.7 - Continuous examination program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...
49 CFR 452.7 - Continuous examination program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...
49 CFR 452.7 - Continuous examination program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...
49 CFR 452.7 - Continuous examination program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...
49 CFR 452.7 - Continuous examination program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS EXAMINATION OF CONTAINERS § 452.7 Continuous examination program. (a) In lieu of a periodic examination under § 452.1, each owner of an approved container meeting § 450.5 may examine the container or have it examined using an approved continuous examination...
7 CFR 1700.54 - Electric Program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Electric Program. 1700.54 Section 1700.54 Agriculture... GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.54 Electric Program. (a) Administrator: The... Administrator, Electric Program, has the authority to approve the following loans, loan guarantees, and lien...
7 CFR 1700.54 - Electric Program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Electric Program. 1700.54 Section 1700.54 Agriculture... GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.54 Electric Program. (a) Administrator: The... Administrator, Electric Program, has the authority to approve the following loans, loan guarantees, and lien...
7 CFR 1700.54 - Electric Program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Electric Program. 1700.54 Section 1700.54 Agriculture... GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.54 Electric Program. (a) Administrator: The... Administrator, Electric Program, has the authority to approve the following loans, loan guarantees, and lien...
40 CFR 272.2501 - Wisconsin State-administered program; final authorization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501... cited in this paragraph are incorporated by reference as part of the hazardous waste management program... Applicable to the Hazardous Waste Management Program, (dated August 9, 1993). (2) EPA Approved Wisconsin...
77 FR 56200 - Agency Information Collection Activities OMB Responses
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-12
... on 08/31/2015; Approved with change. EPA ICR Number 2192.05; Unregulated Contaminant Monitoring in Public Water Systems (Final Rule); 40 CFR 141.35 and 141.40; was approved on 08/06/2012; OMB Number 2040-0270; expires on 08/31/2015; Approved with change. EPA ICR Number 1560.10; National Water Quality...
Section 609 Technician Training and Certification Programs
EPA-approved programs for technicians who service motor vehicle air conditioning (MVAC) systems. Any person who repairs or services a MVAC system for consideration must be certified under section 609 of the Clean Air Act by an EPA-approved program.
49 CFR 240.103 - Approval of design of individual railroad programs by FRA.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Approval of design of individual railroad programs... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION QUALIFICATION AND CERTIFICATION OF... individual railroad programs by FRA. (a) Each railroad shall submit its written certification program and a...
75 FR 28673 - Notice of Request for Extension of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... approved information collection: 49 U.S.C. Sections 5310 and 5311--Capital Assistance Program for Elderly... Assistance Program for Elderly Persons and Persons with Disabilities and Nonurbanized Area Formula Program (OMB Number: 2132-0561) Background: The Capital Assistance Program for Elderly Persons and Persons with...
40 CFR 272.151 - Arizona State-administered program: Final authorization.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...
40 CFR 272.151 - Arizona State-administered program: Final authorization.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...
40 CFR 272.151 - Arizona State-administered program: Final authorization.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...
40 CFR 272.751 - Indiana state-administered program: Final authorization.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...
40 CFR 272.751 - Indiana state-administered program: Final authorization.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...
40 CFR 272.501 - Florida State-administered program: Final authorization.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...
40 CFR 272.151 - Arizona State-administered program: Final authorization.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...
40 CFR 272.501 - Florida State-administered program: Final authorization.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...
40 CFR 272.501 - Florida State-administered program: Final authorization.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...
40 CFR 272.751 - Indiana state-administered program: Final authorization.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...
40 CFR 272.501 - Florida State-administered program: Final authorization.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...
40 CFR 272.501 - Florida State-administered program: Final authorization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...
40 CFR 272.151 - Arizona State-administered program: Final authorization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...
Program and Course Approval Handbook. Fifth Edition
ERIC Educational Resources Information Center
California Community Colleges, Chancellor's Office, 2013
2013-01-01
This "Program and Course Approval Handbook" assists California Community College (CCC) administrators, faculty, and staff in the development of programs and courses and the submission of these proposals for review by the Chancellor's Office. By law, the Chancellor is required to prepare and distribute a handbook for program and course…
30 CFR 27.21 - Methane-monitoring system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane-monitoring system. 27.21 Section 27.21... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Construction and Design Requirements § 27.21 Methane-monitoring system. (a) A methane-monitoring system shall be so designed that any machine or equipment, which...
30 CFR 27.21 - Methane-monitoring system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Methane-monitoring system. 27.21 Section 27.21... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Construction and Design Requirements § 27.21 Methane-monitoring system. (a) A methane-monitoring system shall be so designed that any machine or equipment, which...
30 CFR 27.21 - Methane-monitoring system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Methane-monitoring system. 27.21 Section 27.21... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Construction and Design Requirements § 27.21 Methane-monitoring system. (a) A methane-monitoring system shall be so designed that any machine or equipment, which...
30 CFR 27.21 - Methane-monitoring system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Methane-monitoring system. 27.21 Section 27.21... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Construction and Design Requirements § 27.21 Methane-monitoring system. (a) A methane-monitoring system shall be so designed that any machine or equipment, which...
30 CFR 27.21 - Methane-monitoring system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Methane-monitoring system. 27.21 Section 27.21... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Construction and Design Requirements § 27.21 Methane-monitoring system. (a) A methane-monitoring system shall be so designed that any machine or equipment, which...
Use of Data to Develop a Code Blue Training Program
2017-01-28
MDW/SGVU SUBJECT: Professional Presentation Approval 7 FEB 2016 1. Your paper, entitled Use of Data to Develop a Code Blue Training Program...3039 must be submitted for review and approval.) 6. TITLE OF MATERIAL TO BE PUBLISHED OR PRESENTED: Use of Data to Develop a Code Blue Training ...January 19, 2017 D N/A 29. COMMENTS ~ APPROVED 0 DISAPPROVED Approved training presentation with appropriate disclaimers based on training curriculum
Toward Automated International Law Compliance Monitoring (TAILCM)
2014-07-01
5b. GRANT NUMBER N /A 5c. PROGRAM ELEMENT NUMBER Other (SAF) 6. AUTHOR(S) Leora Morgenstern 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...0.7 0.8 0.9 1 Regulation Type Action Agent Patient Condition Exception Pr ec is io n Category Corrected and Uncorrected Precision for Each Category...89 .82 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Pr ec is io n Category Precision of Each Category for Each Adjudicator A1 A2 A3 Approved for
2012-06-28
a collection of information if it does not display a currently valid OMB control number . PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. a...REPORT TYPE New Reprint 17. LIMITATION OF ABSTRACT UU 15. NUMBER OF PAGES 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 5c. PROGRAM...ELEMENT NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER W911NF-08-1-0317 611103 Form Approved OMB NO. 0704-0188 54223-MS-MUR.32 11. SPONSOR/MONITOR’S
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
15 CFR 970.522 - Monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... exploration activities in accordance with a monitoring plan approved and issued by the Administrator as... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring requirements. 970.522..., Conditions and Restrictions Terms, Conditions, and Restrictions § 970.522 Monitoring requirements. Each...
40 CFR 75.40 - General demonstration requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) CONTINUOUS EMISSION MONITORING Alternative Monitoring Systems § 75.40 General demonstration... continuous emission monitoring system may apply to the Administrator for approval of an alternative monitoring system (or system component) to determine average hourly emission data for SO2, NOX, and/or...
Havrdova, Eva; Cohen, Jeffrey A; Horakova, Dana; Kovarova, Ivana; Meluzinova, Eva
2017-01-01
The introduction of high-efficacy therapies for relapsing-remitting multiple sclerosis has driven re-evaluation of treatment goals and benefit:risk considerations in treatment choice. In the alemtuzumab Phase II and III clinical trials, patients treated with alemtuzumab 12 mg versus subcutaneous interferon beta-1a demonstrated significantly reduced annualized relapse rates and improved magnetic resonance imaging outcomes, and were significantly more likely to achieve no evidence of disease activity and reduction in brain volume loss. In two of the studies, alemtuzumab-treated patients had a significantly reduced risk of 6-month confirmed disease worsening, compared with subcutaneous interferon beta-1a. Benefits were maintained throughout 5 years, with a majority of patients receiving no alemtuzumab retreatment or other disease-modifying therapy. Trial results support alemtuzumab's manageable, consistent safety profile in relapsing-remitting multiple sclerosis. Infusion-associated reactions, the most frequent adverse events (AEs), can be minimized by corticosteroid pretreatment, monitoring, and symptomatic management. Other AEs include infections and autoimmune events. Oral anti-herpes prophylaxis should be initiated on the first day of each alemtuzumab treatment course and continued according to local guidelines. Overall cancer risk was lower in the alemtuzumab clinical trials than in a reference population; however, continuing surveillance will determine if alemtuzumab may be associated with certain malignancies such as thyroid papillary carcinoma and melanoma, which are currently identified as potential risks. The post-approval risk management strategy includes a safety monitoring program. Autoimmune AEs (thyroid events, immune thrombocytopenia, nephropathies) can be detected in a timely manner with the monitoring program, which includes physician and patient education about the signs and symptoms, monthly renal and hematologic monitoring, and quarterly thyroid function monitoring for 48 months after the last alemtuzumab course. Education, vigilance by physicians and patients, and monthly laboratory monitoring are recommended to maintain alemtuzumab's positive benefit:risk profile.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...
7 CFR 996.22 - USDA-approved laboratory.
Code of Federal Regulations, 2010 CFR
2010-01-01
... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
...: EPA is approving revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution, submitted to EPA by the Puerto Rico Environmental Quality Board on July 13, 2011. This action approves... of Puerto Rico's Title V Operating Program. Generally the revisions to the regulations involve...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-29
..., published on March 22, 2012, that approved revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution. Those revisions were submitted to EPA by the Puerto Rico Environmental Quality Board on...] Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of Puerto...
Code of Federal Regulations, 2011 CFR
2011-01-01
... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...
Code of Federal Regulations, 2012 CFR
2012-01-01
... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...
Code of Federal Regulations, 2013 CFR
2013-01-01
... inspection, time and place; application for approval of facilities as official import inspection... § 327.6 Products for importation; program inspection, time and place; application for approval of..., wholesome, and otherwise not adulterated at the time the products are offered for importation into the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
...- approved carotid stent facilities. Included in this notice is a list of the American College of Cardiology... 21244-1850, or you can call (410) 786-6962. Questions concerning Medicare-approved carotid stent... listings of Medicare-approved carotid stent facilities. All facilities listed meet CMS standards for...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... collections of information in CMS regulations and a list of Medicare- approved carotid stent facilities.... Questions concerning Medicare-approved carotid stent facilities in Addendum VIII may be addressed to Sarah J... 20 of the CFR. Addendum VIII includes listings of Medicare-approved carotid stent facilities. All...
30 CFR 250.904 - What is the Platform Approval Program?
Code of Federal Regulations, 2011 CFR
2011-07-01
... these requirements will satisfy MMS criteria for approval of fixed platforms of a proven design that... approval for a floating platform; a platform of unique design; or a platform being installed in deepwater (> 400 ft.) or a frontier area, you must also meet the requirements of the Platform Verification Program...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-28
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services [CMS-3264-FN... Accreditation Program (AOA/HFAP) Application for Continuing CMS-Approval of Its Ambulatory Surgical Center (ASC... 6 years or sooner as determined by CMS. AOA/HFAP's current term of approval for their ASC...
77 FR 59879 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; PBR and PTIO
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
... its air pollution permit program more efficient. Approving these additions will make the Permits by... revisions will make Ohio's air permit program more efficient while continuing to protect human health and...-9714-6] Approval and Promulgation of Air Quality Implementation Plans; Ohio; PBR and PTIO AGENCY...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, J.G.; Adams, S.M.; Hinzman, R.L.
1994-03-01
On September 11, 1986, a modified National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site), a former uranium-enrichment production facility. As required in Part III of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed for the biological monitoring of Mitchell Branch (K-1700 stream) and submitted for approval to the US EPA and the Tennessee Department of Environment and Conservation. The plan described biomonitoring activities that would be conducted over the duration of the permit. The objectives of the BMAP are tomore » demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life, and to document the effects on stream biota resulting from operation of major new pollution abatement facilities. The BMAP consists of four tasks: ambient toxicity testing; bioaccumulation studies; biological indicator studies; and ecological surveys of stream communities, including benthic macroinvertebrates and fish. This document is the second in a series of reports presenting the results of the studies that were conducted over various periods of time between August 1987 and June 1990.« less
Kiechle, Frederick L; Arcenas, Rodney C; Rogers, Linda C
2014-01-01
Benchmarks and metrics related to laboratory test utilization are based on evidence-based medical literature that may suffer from a positive publication bias. Guidelines are only as good as the data reviewed to create them. Disruptive technologies require time for appropriate use to be established before utilization review will be meaningful. Metrics include monitoring the use of obsolete tests and the inappropriate use of lab tests. Test utilization by clients in a hospital outreach program can be used to monitor the impact of new clients on lab workload. A multi-disciplinary laboratory utilization committee is the most effective tool for modifying bad habits, and reviewing and approving new tests for the lab formulary or by sending them out to a reference lab. Copyright © 2013 Elsevier B.V. All rights reserved.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Amendments to and Termination of Approved Management Programs § 923... coastal state may amend or modify a management program which it has submitted and which has been approved...
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Amendments to and Termination of Approved Management Programs § 923... coastal state may amend or modify a management program which it has submitted and which has been approved...
Code of Federal Regulations, 2011 CFR
2011-10-01
... subpart— Approved graduate medical education (GME) program means one of the following: (1) A residency program approved by the Accreditation Council for Graduate Medical Education, by the American Osteopathic... on Podiatric Medical Education of the American Podiatric Medical Association. (2) A program otherwise...
42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2012-10-01 2012-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...
42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2011-10-01 2011-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...
42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2013-10-01 2013-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...
42 CFR 488.61 - Special procedures for approval and re-approval of organ transplant centers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Approval. Centers that have lost their Medicare approval may seek re-entry into the Medicare program at any... 42 Public Health 5 2010-10-01 2010-10-01 false Special procedures for approval and re-approval of... ENFORCEMENT PROCEDURES Special Requirements § 488.61 Special procedures for approval and re-approval of organ...
A New Master of Natural Hazards Program at The Australian National University
NASA Astrophysics Data System (ADS)
Pozgay, S.; Zoleta-Nantes, D.
2009-12-01
The new Master of Natural Hazards program at The Australian National University provides a multi-disciplinary approach to the study and monitoring of geophysical processes that can lead to the recognition of hazards and a consequent reduction of their impacts through emergency measures, disaster plans, and relief and rehabilitation. The program provides people with an understanding of the most up-to-date scientific understanding on the causes of natural hazards, their effects on human societies, and ways to mitigate their impacts and reduce their losses by focusing on Australia and the Asia-Pacific case studies. The Master of Natural Hazards program brings together the expertise of researchers across the university to provide an opportunity for students to do coursework and research projects that will provide them with extensive knowledge of the natural hazards that occur and pose the greatest risks on human communities in the Asia-Pacific, and an understanding of the human dimensions of the natural hazards occurrences. The program consists of two compulsory courses each in the Earth Sciences and in the Social Sciences that are designed to provide a complementary and comprehensive overview of natural hazards issues. Elective courses can be of a general grouping, or students may choose one of four Focus Streams: Environmental and Geographic Studies; Climate Change; Earth Structure and Imaging; or Socio-economic, Development and Policy Studies. A special case study project will involve writing a thesis on a topic to be approved by the Program Conveners and will comprise a body of work on an approved topic in natural hazards in the Asia-Pacific region. Students in this program will gain a broad scientific knowledge and methodological skills to understand the physical causes and frequency of the most important natural hazards in the Asia-Pacific region, as well as the latest scientific methods and best practices of monitoring them for hazard mapping and disaster reduction purposes. Furthermore, students will learn to apply critical thinking in studying the involvement of societies’ social systems in framing and influencing the severity of impacts and destructions that are brought about by different physical events. The academic training in hazards and disaster research that the program offers will enable students to get actively involved in the preparation of short- and long-term disaster mitigation programs that can help members of communities in Australia and the Asia-Pacific region who, without sufficient knowledge on hazards and skills on disaster management, would be left vulnerable against the adversities that can be brought about by natural hazards.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... Previously Approved Information Collection(s): Approval of Underwriters of Marine Hull Insurance AGENCY...: Approval of Underwriters of Marine Hull Insurance. Form Numbers: None. Type of Review: Renewal of an... approval of marine hull underwriters to insure Maritime Administration program vessels. Foreign and...
30 CFR 746.14 - Approval, disapproval or conditional approval, of mining plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., of mining plan. 746.14 Section 746.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM REVIEW AND APPROVAL OF MINING PLANS § 746.14 Approval, disapproval or conditional approval, of mining plan. The Secretary shall approve, disapprove or...
The Tropical Disease Priority Review Voucher: A Game-Changer for Tropical Disease Products.
Berman, Jonathan; Radhakrishna, Tanya
2017-01-11
The Neglected Tropical Disease Voucher Program is a Congressionally-mandated program intended to promote approval of products for tropical diseases because it provides spectacular financial compensation consequent to FDA approval of a priority product. Three drug approvals-artemether/lumifantrine for malaria, bedaquiline for multidrug resistant tuberculosis, miltefosine for leishmaniasis-have received Tropical Disease Vouchers to date. We give our view of the type of products that might qualify for a Tropical Disease Voucher, financial considerations in venturing capital to support product development, clinical ramifications of a successful product approval, and an overall evaluation of the Program. © The American Society of Tropical Medicine and Hygiene.
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR Table 8 to Subpart Eeee of... - Continuous Compliance With Emission Limits
Code of Federal Regulations, 2010 CFR
2010-07-01
..., items 1 through 6 a. Reduce total organic HAP (or, upon approval, TOC) emissions from the closed vent... organic HAP (or, upon approval, TOC) in the exhaust of combustion devices i. Performing CMS monitoring and... HAP (or, upon approval, TOC) emissions during the loading of organic liquids from the closed vent...
78 FR 9807 - Utah Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 944... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We are approving an amendment to the Utah regulatory program (the ``Utah program'') under the Surface Mining...
Alternative Renewable Biomass Tracking Program Document under the Renewable Fuel Standard Program
The approval letters that EPA approves a company's biomass tracking program meeting all the requirements outlined in 40 CFR part 80.1454, including elements determined necessary to achieve the level of quality assurance required under the regulation list.
40 CFR 82.160 - Approved equipment testing organizations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...
40 CFR 82.160 - Approved equipment testing organizations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...
40 CFR 82.160 - Approved equipment testing organizations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...
40 CFR 82.160 - Approved equipment testing organizations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...
40 CFR 82.160 - Approved equipment testing organizations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.160 Approved.... The application shall be mailed to: Section 608 Recycling Program Manager; Global Programs Division... verifying the performance of certified recycling and recovery equipment manufactured over the long term...
38 CFR 21.4236 - Tutorial assistance.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Administration of Educational Assistance Programs Programs of... educational program on a half-time or more basis at an educational institution, and (2) Has a deficiency in a...) Approval. The Department of Veterans Affairs will grant approval when: (1) The educational institution...
38 CFR 21.4236 - Tutorial assistance.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Administration of Educational Assistance Programs Programs of... educational program on a half-time or more basis at an educational institution, and (2) Has a deficiency in a...) Approval. The Department of Veterans Affairs will grant approval when: (1) The educational institution...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false State review and approval of nurse aide training... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Requirements for approval of a nurse aide training... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.152 Requirements for approval of a nurse aide training and competency evaluation program. (a) For a nurse aide training...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2012-10-01 2012-10-01 false State review and approval of nurse aide training...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2011-10-01 2011-10-01 false State review and approval of nurse aide training...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2014-10-01 2014-10-01 false State review and approval of nurse aide training...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Agencies: Nurse Aide Training and Competency Evaluation, and Paid Feeding Assistants § 483.151 State review and approval of nurse aide training and competency evaluation programs. (a) State review and... 42 Public Health 5 2013-10-01 2013-10-01 false State review and approval of nurse aide training...
42 CFR 413.79 - Direct GME payments: Determination of the weighted number of FTE residents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the initial residency period for a resident in an approved child neurology program is the period of... approved preventive medicine residency or fellowship program also may be counted as a full FTE resident for... in geriatric medicine, accredited by the appropriate approving body listed in § 415.152 of this...
40 CFR 272.1800 - State authorization.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...
40 CFR 272.1800 - State authorization.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...
40 CFR 272.1800 - State authorization.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...
40 CFR 272.1800 - State authorization.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., November 8, 1984), 42 U.S.C. 6926 (c) and (g). The Federal program for which a State may receive... Protection Agency, was approved by EPA pursuant to 42 U.S.C. 6926(b) and part 271 of this chapter. EPA's approval of Ohio's base RCRA program was effective on June 30, 1989 (see 54 FR 27173). EPA's approval of...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...
Agwu, Allison L; Lee, Carlton K K; Jain, Sanjay K; Murray, Kara L; Topolski, Jason; Miller, Robert E; Townsend, Timothy; Lehmann, Christoph U
2008-09-15
Antimicrobial stewardship programs aim to reduce inappropriate hospital antimicrobial use. At the Johns Hopkins Children's Medical and Surgical Center (Baltimore, MD), we implemented a World Wide Web-based antimicrobial restriction program to address problems with the existing restriction program. A user survey identified opportunities for improvement of an existing antimicrobial restriction program and resulted in subsequent design, implementation, and evaluation of a World Wide Web-based antimicrobial restriction program at a 175-bed, tertiary care pediatric teaching hospital. The program provided automated clinical decision support, facilitated approval, and enhanced real-time communication among prescribers, pharmacists, and pediatric infectious diseases fellows. Approval status, duration, and rationale; missing request notifications; and expiring approvals were stored in a database that is accessible via a secure Intranet site. Before and after implementation of the program, user satisfaction, reports of missed and/or delayed doses, antimicrobial dispensing times, and cost were evaluated. After implementation of the program, there was a $370,069 reduction in projected annual cost associated with restricted antimicrobial use and an 11.6% reduction in the number of dispensed doses. User satisfaction increased from 22% to 68% and from 13% to 69% among prescribers and pharmacists, respectively. There were 21% and 32% reductions in the number of prescriber reports of missed and delayed doses, respectively, and there was a 37% reduction in the number of pharmacist reports of delayed approvals; measured dispensing times were unchanged (P = .24). In addition, 40% fewer restricted antimicrobial-related phone calls were noted by the pharmacy. The World Wide Web-based antimicrobial approval program led to improved communication, more-efficient antimicrobial administration, increased user satisfaction, and significant cost savings. Integrated tools, such as this World Wide Web-based antimicrobial approval program, will effectively enhance antimicrobial stewardship programs.
30 CFR 75.342 - Methane monitors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane monitors. 75.342 Section 75.342 Mineral... SAFETY STANDARDS-UNDERGROUND COAL MINES Ventilation § 75.342 Methane monitors. (a)(1) MSHA approved methane monitors shall be installed on all face cutting machines, continuous miners, longwall face...
30 CFR 75.342 - Methane monitors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Methane monitors. 75.342 Section 75.342 Mineral... SAFETY STANDARDS-UNDERGROUND COAL MINES Ventilation § 75.342 Methane monitors. (a)(1) MSHA approved methane monitors shall be installed on all face cutting machines, continuous miners, longwall face...
49 CFR 1522.113 - Withdrawal of approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY SECURITY RULES FOR ALL MODES OF TRANSPORTATION TSA-APPROVED VALIDATION FIRMS AND VALIDATORS TSA-Approved Validation Firms and Validators for the Certified Cargo Screening Program... TSA-approved validation firm if the validation firm ceases to meet the standards for approval, fails...
Gershman, Jennifer A; Gershman, Jason A; Fass, Andrea D; Popovici, Ioana
2014-12-01
The purpose of this study is to assess Florida physicians' attitudes and knowledge toward accessing the state's prescription drug monitoring program (PDMP). Five thousand medical doctors and osteopathic physicians licensed in Florida were randomly selected for a voluntary and anonymous 15-question self-administered survey approved by the Institutional Review Board. Surveys were distributed through U.S. postal service mail. Likert-scale questions were used to assess prior knowledge (1 = none to 5 = excellent) and attitudes toward accessing the PDMP (1 = strongly disagree to 5 = strongly agree). The study yielded a response rate of 7.8%, 71.5% of whom agreed or strongly agreed that the PDMP is a useful tool. Among participants that have access and answered the PDMP usefulness question, 94.8% agree or strongly agree that it is a useful tool. There were 63 out of 64 physicians (98.4%) who conducted 25 or more searches who agreed or strongly agreed that the PDMP is a useful tool for monitoring patients' controlled substance histories. There were 72.5% of participants with access that answered the "doctor shopping" question who agreed that "doctor shopping" will decrease. Among the 64 most frequent PDMP users, 69.4% agreed or strongly agreed that they have prescribed fewer controlled substances after accessing the PDMP. The study revealed that a majority of participants believe that the PDMP is a useful tool for monitoring patients' controlled substance histories. More continuing education programs should be provided to Florida physicians to enhance their knowledge regarding PDMPs. Wiley Periodicals, Inc.
Worldwide, 3-Year, Post-Marketing Surveillance Experience with Tofacitinib in Rheumatoid Arthritis.
Cohen, Stanley; Curtis, Jeffrey R; DeMasi, Ryan; Chen, Yan; Fan, Haiyun; Soonasra, Arif; Fleischmann, Roy
2018-06-01
Post-marketing surveillance (PMS) is an integral part of monitoring adverse events (AEs) following approval of new drugs. Tofacitinib is an oral Janus kinase inhibitor for the treatment of rheumatoid arthritis (RA). An analysis of PMS reports was conducted to evaluate the safety of tofacitinib in a post-marketing setting. Worldwide tofacitinib PMS data received in the Pfizer safety database from November 6, 2012 (first marketing authorization of tofacitinib) to November 5, 2015 were analyzed. Serious AEs (SAEs) of interest were reviewed and reporting rates (RRs) were calculated by dividing the number of SAEs by the estimated 100 patient-years of exposure. Patient exposure was calculated based on estimated worldwide sales and an estimated daily regimen of tofacitinib 5 mg twice daily. During the 3-year reporting period, worldwide post-marketing exposure to tofacitinib since approval was estimated to be 34,223 patient-years. In total, 9291 case reports (82.9% non-serious) were received and 25,417 AEs, 102 fatal cases, and 4352 SAEs were reported. The RRs (per 100 patient-years) for SAEs of interest by Medical Dictionary for Regulatory Activities System Organ Class were 2.57 for infections, 0.91 for gastrointestinal disorders, 0.60 for respiratory disorders, 0.45 for neoplasms, 0.43 for cardiac disorders, and 0.12 for hepatobiliary disorders. Although there are limitations to these data, no new safety risks were revealed in this real-world setting compared with the safety profile identified in the tofacitinib RA clinical development program. Any risks identified through the tofacitinib development program and PMS will continue to be monitored through pharmacovigilance surveillance. Pfizer Inc.
Alabama Commission on Higher Education 1986 Annual Report.
ERIC Educational Resources Information Center
Alabama State Commission on Higher Education, Montgomery.
The 1986 annual report outlines planning and coordination activities and student financial aid programs. The following planning and coordination activities are considered: statewide planning and facilities planning, a new program approval procedure, approval of off-campus offerings, studies of the state's engineering programs and needs and allied…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-21
... Information Collection: Comment Request; Housing Counseling Program--Application for Approval as a Housing Counseling Agency AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION: Notice. SUMMARY: The...: Title of Proposal: Housing Counseling Program--Application for Approval as a Housing Counseling Agency...
14 CFR 91.1437 - CAMP: Authority to perform and approve maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Ownership Operations Program Management § 91.1437 CAMP: Authority to perform and approve maintenance. A program manager who maintains program aircraft under a CAMP may employ maintenance personnel, or make... maintenance. 91.1437 Section 91.1437 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...
40 CFR 52.241 - Inspection and maintenance program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...
40 CFR 52.241 - Inspection and maintenance program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...
40 CFR 52.241 - Inspection and maintenance program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...
40 CFR 52.241 - Inspection and maintenance program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.241 Inspection and maintenance program. (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision to the California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy...
78 FR 5350 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
...] Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On December 7, 2012 Massachusetts submitted an application to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... an Information Collection; National Veterinary Accreditation Program AGENCY: Animal and Plant Health... approval of an information collection associated with the National Veterinary Accreditation Program. DATES...: For information on the National Veterinary Accreditation Program, contact Dr. Todd Behre, Veterinary...
7 CFR 996.22 - USDA-approved laboratory.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 8 2013-01-01 2013-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...
7 CFR 996.22 - USDA-approved laboratory.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 8 2012-01-01 2012-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...
7 CFR 996.22 - USDA-approved laboratory.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 8 2014-01-01 2014-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...
7 CFR 996.22 - USDA-approved laboratory.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 8 2011-01-01 2011-01-01 false USDA-approved laboratory. 996.22 Section 996.22... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.22 USDA-approved laboratory. USDA-approved laboratory means laboratories approved by the Science and Technology Programs...
30 CFR 7.507 - Air-monitoring components.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Air-monitoring components. 7.507 Section 7.507... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Refuge Alternatives § 7.507 Air-monitoring components. (a) Each refuge alternative shall have an air-monitoring component that provides persons inside...
30 CFR 7.507 - Air-monitoring components.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Air-monitoring components. 7.507 Section 7.507... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Refuge Alternatives § 7.507 Air-monitoring components. (a) Each refuge alternative shall have an air-monitoring component that provides persons inside...
30 CFR 7.507 - Air-monitoring components.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Air-monitoring components. 7.507 Section 7.507... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Refuge Alternatives § 7.507 Air-monitoring components. (a) Each refuge alternative shall have an air-monitoring component that provides persons inside...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... monitoring, accumulated refuse, surface methane monitoring, and collection and control system exceedances... included a burden item for Agency review of surface methane monitoring reports. Respondents, however, are... adjusted the calculations to exclude any Agency burden associated with surface methane monitoring. We have...
40 CFR 65.161 - Continuous records and monitoring system data handling.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Routing to a Fuel Gas System or a Process § 65.161 Continuous records and monitoring system data handling...) Monitoring system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and... section unless an alternative monitoring or recordkeeping system has been requested and approved under...
40 CFR 65.161 - Continuous records and monitoring system data handling.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Routing to a Fuel Gas System or a Process § 65.161 Continuous records and monitoring system data handling...) Monitoring system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and... section unless an alternative monitoring or recordkeeping system has been requested and approved under...
Soil Fumigant Training for Certified Applicators
This page includes the soil fumigant training programs developed by pesticide registrants and approved by EPA, as well as EPA-approved alternatives to the registrant training programs that are available for specific states.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
...This action is another in a series of steps EPA is taking to implement the Prevention of Significant Deterioration (PSD) program for greenhouse gas (GHG)-emitting sources. EPA is finalizing its proposed rulemaking to narrow its previous approval of State Implementation Plan (SIP) PSD programs in 24 states that apply to GHG-emitting sources. Specifically, EPA is withdrawing its previous approval of those programs to the extent they apply PSD to GHG-emitting sources below the thresholds in the final Tailoring Rule, which EPA promulgated by Federal Register notice dated June 3, 2010. Having narrowed its prior approval, EPA asks that each affected state withdraw from EPA consideration the part of its SIP that is no longer approved. The states for whose SIPs EPA is narrowing approval are: Alabama, California, Colorado, Georgia, Indiana, Iowa, Louisiana, Maine, Maryland, Mississippi, Missouri, New Hampshire, New Mexico, North Carolina, Ohio, Oklahoma, Rhode Island, South Carolina, South Dakota, Tennessee, Utah, Vermont, Virginia, and Wisconsin.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2009 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination andmore » determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2009 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2009 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2009 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information.« less
29 CFR 5.17 - Withdrawal of approval of a training program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CONTRACTS SUBJECT TO THE CONTRACT WORK HOURS AND SAFETY STANDARDS ACT) Davis-Bacon and Related Acts... for the classification of work actually performed until an acceptable program is approved. ...
29 CFR 5.17 - Withdrawal of approval of a training program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... NONCONSTRUCTION CONTRACTS SUBJECT TO THE CONTRACT WORK HOURS AND SAFETY STANDARDS ACT) Davis-Bacon and Related... for the classification of work actually performed until an acceptable program is approved. ...
Independence Community College Property Appraisal/Assessment Program.
ERIC Educational Resources Information Center
Swender, Herbert J.
This report to the Kansas State Department of Education supports Independence Community College's (ICC's) request for approval of a new vocational education program in Property Appraisal/Assessment. The report begins with two letters of support and the application for new program approval. Next, a project narrative provides background information…
15 CFR 923.133 - Procedure for conducting continuing reviews of approved State CZM programs.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS... performance of coastal States with respect to coastal management. Each review shall include a written... and enforced the program approved by the Secretary, addressed the coastal management needs identified...
15 CFR 923.133 - Procedure for conducting continuing reviews of approved State CZM programs.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS... performance of coastal States with respect to coastal management. Each review shall include a written... and enforced the program approved by the Secretary, addressed the coastal management needs identified...
7 CFR 2201.23 - Funding for the Program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the Program and operate the Program accordingly. (b) Credit Risk Premium—(1) Establishment and approval. The Board may establish and approve the acceptance of credit risk premiums with respect to a..., credit risk premiums shall be accepted from a non-Federal source on behalf of a Borrower. (2) Credit risk...
50 CFR 15.26 - Approval of cooperative breeding programs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 1 2014-10-01 2014-10-01 false Approval of cooperative breeding programs. 15.26 Section 15.26 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... program requested for the exotic bird species, including: (i) A breeding protocol, including a genetic...
50 CFR 15.26 - Approval of cooperative breeding programs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 1 2013-10-01 2013-10-01 false Approval of cooperative breeding programs. 15.26 Section 15.26 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... program requested for the exotic bird species, including: (i) A breeding protocol, including a genetic...
50 CFR 15.26 - Approval of cooperative breeding programs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 1 2012-10-01 2012-10-01 false Approval of cooperative breeding programs. 15.26 Section 15.26 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... program requested for the exotic bird species, including: (i) A breeding protocol, including a genetic...
78 FR 57208 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... LEVEL: End of runway deicing program--phase 1, runway 34R. Taxiway S pavement reconstruction. Replace carousel 9 and oversized bag belt TU3. Terminal redevelopment program--design and associated technical... APPROVED FOR COLLECTION AND USE: PFC program administration. Design taxiways A, L and B. BRIEF DESCRIPTION...
49 CFR 242.103 - Approval of design of individual railroad programs by FRA.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Approval of design of individual railroad programs by FRA. 242.103 Section 242.103 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION QUALIFICATION AND CERTIFICATION OF CONDUCTORS Program and Eligibility Requirements...
Trainee Impairment in APA Approved Internship and Graduate Programs.
ERIC Educational Resources Information Center
Rangel, Deborah Marie; Boxley, Russell
All programs that are involved in training professionals have some experience with impaired trainees. A study was conducted to examine how different American Psychological Association (APA) approved pre-doctoral internship and graduate programs in psychology handle trainee difficulty and impairment. A 62-item questionnaire was completed by…
33 CFR 263.20 - Program funding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...
33 CFR 263.20 - Program funding.
Code of Federal Regulations, 2011 CFR
2011-07-01
... authorities of this Program will be utilized by the Corps of Engineers in conducting studies approved by... grants of Program funds will be made to local interests for conducting studies or constructing projects... Engineer to proceed with a feasibility study, after submission of a DPR to OCE and approval of the Division...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-16
... measure their effectiveness. Through its voluntary Corporate Security Review (CSR) Program, TSA's Highway... DEPARTMENT OF HOMELAND SECURITY Transportation Security Administration Intent To Request Approval From OMB of One New Public Collection of Information: Security Program for Hazardous Materials Motor...
78 FR 77418 - Notice of Request for Revision of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... to a currently approved information collection for the Advanced Biofuel Payment Program. DATES... INFORMATION: Title: Advanced Biofuel Payment Program. OMB Number: OMB No. 0570-0063. Expiration Date of... collection. Abstract: The Advanced Biofuel Payment Program was authorized under section 9005 of Title IX of...
76 FR 270 - Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
...] Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved Municipal Solid Waste Landfill (MSWLF) permit program. The approved modification allows the State..., EPA issued a final rule (69 FR 13242) amending the Municipal Solid Waste Landfill (MSWLF) criteria in...
75 FR 53268 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On June 28, 2010 New Hampshire submitted an application to EPA...
30 CFR 906.15 - Approval of Colorado regulatory program amendments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado regulatory program amendments. 906.15 Section 906.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS General Administration § 493.645 Additional fee(s) applicable to approved State laboratory programs and... laboratory programs and laboratories issued a certificate of accreditation, certificate of waiver, or...
40 CFR 282.96 - Virginia State-Administered Program.
Code of Federal Regulations, 2010 CFR
2010-07-01
...” includes heating oil tanks of greater than 5,000 gallon capacity and “Regulated substance” 9 VAC 25-580-130General requirements for all petroleum and hazardous substance UST systems, heating oil tanks of greater... WASTES (CONTINUED) APPROVED UNDERGROUND STORAGE TANK PROGRAMS Approved State Programs § 282.96 Virginia...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
In March 2009, the CCC/USDA developed a plan for annual monitoring of the groundwater and surface water (Argonne 2009). Under this plan, approved by the KDHE (2009), monitoring wells are sampled by using the low-flow procedure (Puls and Barcelona 1996; Yeskis and Zavala 2002), and surface water samples are collected at five locations along the intermittent creek. Vegetation sampling is conducted as a secondary indicator of plume migration. As of 2015, the frequency of surface water sampling has been decreased to once yearly, per the approval of the KDHE (2015).
40 CFR 52.931 - Significant deterioration of air quality.
Code of Federal Regulations, 2013 CFR
2013-07-01
... approval of Kentucky's Regulation for Prevention of Significant Deterioration (PSD), Visibility Monitoring... Deterioration (PSD), Visibility Monitoring, and Visibility New Source Review in Attainment Areas. (b) The...
40 CFR 52.931 - Significant deterioration of air quality.
Code of Federal Regulations, 2014 CFR
2014-07-01
... approval of Kentucky's Regulation for Prevention of Significant Deterioration (PSD), Visibility Monitoring... Deterioration (PSD), Visibility Monitoring, and Visibility New Source Review in Attainment Areas. (b) The...
40 CFR 52.931 - Significant deterioration of air quality.
Code of Federal Regulations, 2012 CFR
2012-07-01
... approval of Kentucky's Regulation for Prevention of Significant Deterioration (PSD), Visibility Monitoring... Deterioration (PSD), Visibility Monitoring, and Visibility New Source Review in Attainment Areas. (b) The...
40 CFR 52.931 - Significant deterioration of air quality.
Code of Federal Regulations, 2011 CFR
2011-07-01
... approval of Kentucky's Regulation for Prevention of Significant Deterioration (PSD), Visibility Monitoring... Deterioration (PSD), Visibility Monitoring, and Visibility New Source Review in Attainment Areas. (b) The...
Oral Fluid Testing for Drugs of Abuse
Bosker, Wendy M.; Huestis, Marilyn A.
2011-01-01
BACKGROUND Oral fluid (OF) is an exciting alternative matrix for monitoring drugs of abuse in workplace, clinical toxicology, criminal justice, and driving under the influence of drugs (DUID) programs. During the last 5 years, scientific and technological advances in OF collection, point-of-collection testing devices, and screening and confirmation methods were achieved. Guidelines were proposed for workplace OF testing by the Substance Abuse and Mental Health Services Administration, DUID testing by the European Union’s Driving under the Influence of Drugs, Alcohol and Medicines (DRUID) program, and standardization of DUID research. Although OF testing is now commonplace in many monitoring programs, the greatest current limitation is the scarcity of controlled drug administration studies available to guide interpretation. CONTENT This review outlines OF testing advantages and limitations, and the progress in OF that has occurred during the last 5 years in collection, screening, confirmation, and interpretation of cannabinoids, opioids, amphetamines, cocaine, and benzodiazepines. We examine controlled drug administration studies, immunoassay and chromatographic methods, collection devices, point-of-collection testing device performance, and recent applications of OF testing. SUMMARY Substance Abuse and Mental Health Services Administration approval of OF testing was delayed because questions about drug OF disposition were not yet resolved, and collection device performance and testing assays required improvement. Here, we document the many advances achieved in the use of OF. Additional research is needed to identify new bio-markers, determine drug detection windows, characterize OF adulteration techniques, and evaluate analyte stability. Nevertheless, there is no doubt that OF offers multiple advantages as an alternative matrix for drug monitoring and has an important role in DUID, treatment, workplace, and criminal justice programs. PMID:19745062
15 CFR 923.60 - Review/approval procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Review/Approval Procedures § 923.60 Review/approval...
15 CFR 923.60 - Review/approval procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Review/Approval Procedures § 923.60 Review/approval...
Administrator, National Security Education Program
1993-01-19
1. Administer, direct, and manage the resources for the lit program. 2. Establish and direct an international education center, as approved by the...approve the hiring of, and evaluate the performance of personnel who staff the international education center. 4. Ensure appropriate internal management...Administrator, National Security Education Program * References: (a) DoD Directive 1025.2 , "National Security * Education Program," January 13, 1993
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PRETREATMENT REGULATIONS FOR EXISTING AND NEW SOURCES OF POLLUTION § 403.11 Approval procedures for POTW pretreatment programs...
30 CFR 27.5 - Letter of certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS General Provisions § 27.5 Letter of certification. (a) Upon completion of investigation of a methane-monitoring system, or component or subassembly...
30 CFR 27.5 - Letter of certification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS General Provisions § 27.5 Letter of certification. (a) Upon completion of investigation of a methane-monitoring system, or component or subassembly...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-19
...EPA is approving a state implementation plan (SIP) revision submitted by the Wisconsin Department of Natural Resources on June 7, 2012, concerning the state's vehicle inspection and maintenance (I/M) program in southeast Wisconsin. The revision amends I/M program requirements in the active control measures portion of the ozone SIP to reflect changes that have been implemented at the state level since EPA fully approved the I/M program on August 16, 2001. The submittal also includes a demonstration under section 110(l) of the Clean Air Act (CAA) addressing lost emission reductions associated with the program changes.
Anual Report of Groundwater Monitoring at Centralia, Kansas, in 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
2016-10-01
The KDHE (2012) agreed to annual sampling at all locations, beginning with the 2013 monitoring documented previously (Argonne 2014a). This present report documents the results of the annual sampling of the approved monitoring well network on September 27-30, 2015.
Robotics Collaborative Technology Alliance (RCTA) 2011 Baseline Assessment Experimental Strategy
2011-09-01
distribution is unlimited. NOTICES Disclaimers The...Information Sciences Directorate, ARL Approved for public release; distribution is unlimited...ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION /AVAILABILITY STATEMENT Approved
ERIC Educational Resources Information Center
Hartel, R. W.; Iwaoka, W. T.
2016-01-01
For the past 15 years, Institute of Food Technologists (IFT) has mandated assessment of undergraduate student learning outcomes as the basis for approving food science (FS) programs. No longer is a check-off course system sufficient to be an IFT-approved program. The 4 steps to gaining IFT approval include developing learning outcomes for all…
Annual update: drugs, diagnostics and devices.
Berardinelli, Candace; Kupecz, Deborah
2003-03-01
As NPs continue to play an important role in health care as administers of prescriptions, the value of reviewing the latest Food and Drug Administration (FDA) approvals for new drugs and devices is immeasurable. In 2002, the FDA approved several new drugs and devices, as well as monitored previously approved drugs for adverse reactions and untoward events. This article provides a brief review of relevant primary care topics.
Monitoring Quality of Biotherapeutic Products Using Multivariate Data Analysis.
Rathore, Anurag S; Pathak, Mili; Jain, Renu; Jadaun, Gaurav Pratap Singh
2016-07-01
Monitoring the quality of pharmaceutical products is a global challenge, heightened by the implications of letting subquality drugs come to the market on public safety. Regulatory agencies do their due diligence at the time of approval as per their prescribed regulations. However, product quality needs to be monitored post-approval as well to ensure patient safety throughout the product life cycle. This is particularly complicated for biotechnology-based therapeutics where seemingly minor changes in process and/or raw material attributes have been shown to have a significant effect on clinical safety and efficacy of the product. This article provides a perspective on the topic of monitoring the quality of biotech therapeutics. In the backdrop of challenges faced by the regulatory agencies, the potential use of multivariate data analysis as a tool for effective monitoring has been proposed. Case studies using data from several insulin biosimilars have been used to illustrate the key concepts.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
... ambient air quality monitoring data for the period preceding the applicable attainment deadline. DATES... and certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data... standard, generally based on air quality monitoring data from the 1987 through 1989 period (section 107(d...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
... based on complete, quality-assured and certified ambient air quality monitoring data for 2007-2009... certain air quality monitoring data because they meet the criteria for ozone exceptional events that are... certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data show...
Progress of research on water vapor lidar
NASA Technical Reports Server (NTRS)
Wilkerson, Thomas D.; Singh, U. N.
1989-01-01
Research is summarized on applications of stimulated Raman scattering (SRS) of laser light into near infrared wavelengths suitable for atmospheric monitoring. Issues addressed are conversion efficiency, spectral purity, optimization of operating conditions, and amplification techniques. A Raman cell was developed and built for the laboratory program, and is now available to NASA-Langley, either as a design or as a completed cell for laboratory or flight applications. The Raman cell has been approved for flight in NASA's DC-8 aircraft. The self-seeding SRS technique developed here is suggested as an essential improvement for tunable near-IR DIAL applications at wavelengths of order 1 micrometer or greater.
New technology in electrophysiology: FDA process and perspective.
Selzman, Kimberly A; Fellman, Mark; Farb, Andrew; de Del Castillo, Sergio; Zuckerman, Bram
2016-10-01
The Food and Drug Administration (FDA) is a large regulatory agency that monitors everything from food, tobacco, and veterinary medicine to pharmaceutical drugs and medical devices. The Mission statement of the CDRH, one of the Centers of the FDA, in its most succinct form is to protect and promote public health. This is accomplished through timely and continued access to safe, effective, and high quality medical devices. This paper aims to review the overarching principles of the Agency's review process for cardiac devices as well as highlight some of the newer programs that FDA has engaged in to facilitate innovation, device development, research, and timely market approval.
30 CFR 27.7 - Certification plate or label.
Code of Federal Regulations, 2010 CFR
2010-07-01
... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS General Provisions § 27.7 Certification plate or label. A certified methane-monitoring system or component thereof shall be identified with a...
30 CFR 27.7 - Certification plate or label.
Code of Federal Regulations, 2011 CFR
2011-07-01
... APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS General Provisions § 27.7 Certification plate or label. A certified methane-monitoring system or component thereof shall be identified with a...
49 CFR 190.9 - Petitions for finding or approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Petitions for finding or approval. 190.9 Section... PROGRAMS AND RULEMAKING PROCEDURES General § 190.9 Petitions for finding or approval. (a) In circumstances... finding or approval, an operator may petition the Administrator for such a finding or approval. (b) Each...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
... Efficiency and Conservation Block Grant Program Status Report AGENCY: U.S. Department of Energy. ACTION... Conservation Block Grant (EECBG) Program is available for review at the following Web sites: http://www1.eere... and Conservation Block Grant (EECBG) Program Status Report''; (3) Revision of currently approved...
25 CFR 273.17 - Programs approved by Indian Education Committee.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Programs approved by Indian Education Committee. 273.17 Section 273.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...
25 CFR 273.17 - Programs approved by Indian Education Committee.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Programs approved by Indian Education Committee. 273.17 Section 273.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...
25 CFR 273.17 - Programs approved by Indian Education Committee.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Programs approved by Indian Education Committee. 273.17 Section 273.17 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.17...
76 FR 19739 - Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0013; FRL-9290-1] Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental Protection Agency... the System Cap Trading (SCT) Program at Title 30 Texas Administrative Code, Chapter 101--General Air...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
... Activities; Submission to OMB for Review and Approval; Comment Request; Landfill Methane Outreach Program... the electronic docket, go to www.regulations.gov . Title: Landfill Methane Outreach Program (Renewal... consolidated in 40 CFR part 9. Abstract: The Landfill Methane Outreach Program (LMOP), created by EPA as part...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-21
...; Interstate Movement Restrictions and Indemnity Program AGENCY: Animal and Plant Health Inspection Service... with regulations for the interstate movement of sheep and goats and an indemnity program to control the... Movement Restrictions and Indemnity Program. OMB Number: 0579-0101. Type of Request: Extension of approval...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-29
... Fish Restoration Act (16 U.S.C. 777 et seq.) and established the Multistate Conservation Grant Program...-9410-0000] Multistate Conservation Grant Program; Priority List and Approval for Conservation Projects... year 2013 priority list of wildlife and sport fish conservation projects from the Association of Fish...
76 FR 709 - Guidelines for Awarding Clean Water Act Section 319 Base Grants to Indian Tribes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-06
... in implementing approved NPS management programs developed pursuant to section 319(b). The primary goal of the NPS management program is to control NPS pollution through implementation of management... may be used for a range of activities that implement the tribe's approved NPS management program...
48 CFR 1819.7203 - Mentor approval process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...
48 CFR 1819.7203 - Mentor approval process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...
48 CFR 1819.7203 - Mentor approval process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...
48 CFR 1819.7203 - Mentor approval process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...
48 CFR 1819.7203 - Mentor approval process.
Code of Federal Regulations, 2010 CFR
2010-10-01
... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...
Code of Federal Regulations, 2010 CFR
2010-10-01
... statement of work is approved. (Approved by the Office of Management and Budget under OMB control number... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Criteria for program... Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
... approve South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... Rule 317, an equivalent alternative program, is not less stringent than the program required by section... equivalent alternative programs, and, if so, whether Rule 317 would constitute an approvable equivalent...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL... 7 Agriculture 3 2010-01-01 2010-01-01 false Submission and determination of proposed State organic programs and amendments to approved State organic programs. 205.621 Section 205.621 Agriculture Regulations...
30 CFR 944.15 - Approval of Utah regulatory program amendments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...
30 CFR 944.15 - Approval of Utah regulatory program amendments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...
30 CFR 944.15 - Approval of Utah regulatory program amendments.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...
30 CFR 944.15 - Approval of Utah regulatory program amendments.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...
30 CFR 944.15 - Approval of Utah regulatory program amendments.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 816/817.61; 850; Memorandum of Agreement between the Board and Division of Oil, Gas, and Mining and... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Utah regulatory program amendments..., DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE UTAH § 944...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... Activities; Submission to OMB for Review and Approval; Comment Request; Risk Management Program Requirements... information about the electronic docket, go to www.regulations.gov . Title: Risk Management Program... process develop and implement a risk management program and submit a risk management plan to EPA. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... Program. The Sexual Assault Services Program (SASP), created by the Violence Against Women Act of 2005... of a Currently Approved Collection Semi-Annual Progress Report for the Tribal Sexual Assault Services Program ACTION: 60-Day Notice. The Department of Justice, Office on Violence Against Women (OVW) will be...
40 CFR 52.27 - Protection of visibility from sources in attainment areas.
Code of Federal Regulations, 2012 CFR
2012-07-01
... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...
40 CFR 52.27 - Protection of visibility from sources in attainment areas.
Code of Federal Regulations, 2011 CFR
2011-07-01
... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...
40 CFR 52.27 - Protection of visibility from sources in attainment areas.
Code of Federal Regulations, 2014 CFR
2014-07-01
... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...
40 CFR 52.27 - Protection of visibility from sources in attainment areas.
Code of Federal Regulations, 2013 CFR
2013-07-01
... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...
40 CFR 52.27 - Protection of visibility from sources in attainment areas.
Code of Federal Regulations, 2010 CFR
2010-07-01
... quality standards for such pollutants, and where a State PSD program has been approved as part of the... Act, in the prevention of significant deterioration (PSD) program approved as part of the applicable...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
...-Approved Lung JoAnna Baldwin, MS.. (410) 786-7205 Volume Reduction Surgery Facilities. XIV Medicare-Approved Kate Tillman, RN, (410) 786-9252 Bariatric Surgery MAS. Facilities. XV Fluorodeoxyglucose Stuart...