Sample records for monitoring program fy

  1. Comprehensive Monitoring Program: Air Quality Data Assessment Report for FY90. Volume 2. Version 3.1

    DTIC Science & Technology

    1991-09-01

    91311R01 If VERSION 3.10) VOLUME II Comm 2ND COPY COMPREHENSIVE MONITORING PROGRAM Contract Number DAAAI5-87-0095 AIR QUALITY DATA ASSESSMENT REPORT...MONITORING PROGRAM. FINAL AIR QUALITY DATA ASSESSMENT REPORT FOR FY90, VERSION 3.1 NONE 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRES.S(S) 8...RELEASE; DISTRIBUTION IS UNLIMITED 13. ABSTRACT (Maximum 200 words) THE OBJECTIVE OF THIS CMP IS TO: VERIFY AND EVALUATE POTENTIAL AIR QUALITY HEALTH

  2. Boundary Control Systems, Assessment Remedial Investigation, Version 2. 1. Volume 1

    DTIC Science & Technology

    1988-12-01

    ALLUVIAL WELLS CALCULATED TRANSMISSIVITY VALUES. AND ALLUVIAL WELLS MONITORED. . FOR WATER LEVELS FY87 A.? WELL SITING RATIONALE 10 A-3 WELL COMPLETION...29 Contour Map of Transmissivity of the Alluvial Aquifer 3rd Quarter FY 1987 B-30 Potentiometric Surface, Denver Formation Sand Zone 4 3rd Quarter FY...Monitoring 2-10 2.2-2 Chemical Analysis - Task 25 Anal-tical Program ;-14 4.1-1 Transmissivity (T), Hydraulic Conductivity (K), and 4-12 Apparent Specific

  3. Yucca Mountain Biological Resources Monitoring Program; Annual report, FY91

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-01-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a possible site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a repository. To ensure that site characterization activities (SCA) do not adversely affect the Yucca Mountain area, an environmental program has been implemented to monitor and mitigate potential impacts and to ensure that activities comply with applicable environmentalmore » regulations. This report describes the activities and accomplishments during fiscal year 1991 (FY91) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Activities Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.« less

  4. Site Characterization and Monitoring Technical Support Center FY16 Report

    EPA Science Inventory

    SCMTSC’s primary goal is to provide technical assistance to regional programs on complex hazardous waste site characterization issues. This annual report illustrates the range and extent of projects that SCMTSC supported in FY 2016. Our principal audiences are site project manage...

  5. Yucca Mountain biological resources monitoring program; Annual report FY92

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1993-02-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a potential site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities (SCA) do not adversely affect the environment at Yucca Mountain, an environmental program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmentalmore » regulations. This report describes the activities and accomplishments of EG&G Energy Measurements, Inc. (EG&G/EM) during fiscal year 1992 (FY92) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.« less

  6. Monitoring in the nearshore: A process for making reasoned decisions

    USGS Publications Warehouse

    Bodkin, James L.; Dean, T.A.

    2003-01-01

    Over the past several years, a conceptual framework for the GEM nearshore monitoring program has been developed through a series of workshops. However, details of the proposed monitoring program, e.g. what to sample, where to sample, when to sample and at how many sites, have yet to be determined. In FY 03 we were funded under Project 03687 to outline a process whereby specific alternatives to monitoring are developed and presented to the EVOS Trustee Council for consideration. As part of this process, two key elements are required before reasoned decisions can be made. These are: 1) a comprehensive historical perspective of locations and types of past studies conducted in the nearshore marine communities within Gulf of Alaska, and 2) estimates of costs for each element of a proposed monitoring program. We have developed a GIS database that details available information from past studies of selected nearshore habitats and species in the Gulf of Alaska and provide a visual means of selecting sites based (in part) on the locations for which historical data of interest are available. We also provide cost estimates for specific monitoring plan alternatives and outline several alternative plans that can be accomplished within reasonable budgetary constraints. The products that we will provide are: 1) A GIS database and maps showing the location and types of information available from the nearshore in the Gulf of Alaska; 2) A list of several specific monitoring alternatives that can be conducted within reasonable budgetary constraints; and 3) Cost estimates for proposed tasks to be conducted as part of the nearshore program. Because data compilation and management will not be completed until late in FY03 we are requesting support for close-out of this project in FY 04.

  7. Chemiresistor microsensors for in-situ monitoring of volatile organic compounds : final LDRD report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Michael Loren; Hughes, Robert Clark; Kooser, Ara S.

    2003-09-01

    This report provides a summary of the three-year LDRD (Laboratory Directed Research and Development) project aimed at developing microchemical sensors for continuous, in-situ monitoring of volatile organic compounds. A chemiresistor sensor array was integrated with a unique, waterproof housing that allows the sensors to be operated in a variety of media including air, soil, and water. Numerous tests were performed to evaluate and improve the sensitivity, stability, and discriminatory capabilities of the chemiresistors. Field tests were conducted in California, Nevada, and New Mexico to further test and develop the sensors in actual environments within integrated monitoring systems. The field testsmore » addressed issues regarding data acquisition, telemetry, power requirements, data processing, and other engineering requirements. Significant advances were made in the areas of polymer optimization, packaging, data analysis, discrimination, design, and information dissemination (e.g., real-time web posting of data; see www.sandia.gov/sensor). This project has stimulated significant interest among commercial and academic institutions. A CRADA (Cooperative Research and Development Agreement) was initiated in FY03 to investigate manufacturing methods, and a Work for Others contract was established between Sandia and Edwards Air Force Base for FY02-FY04. Funding was also obtained from DOE as part of their Advanced Monitoring Systems Initiative program from FY01 to FY03, and a DOE EMSP contract was awarded jointly to Sandia and INEEL for FY04-FY06. Contracts were also established for collaborative research with Brigham Young University to further evaluate, understand, and improve the performance of the chemiresistor sensors.« less

  8. Sampling results, DNAPL monitoring well GW-729, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drier, R.B.; Caldanaro, A.J.

    1996-12-01

    This document, Sampling Results, DNAPL Monitoring Well G W-729, Third Quarter FY 1995 through Third Quarter FY 1996, was performed under Work Breakdown Structure 1.4.12.1.1.02 (Activity Data Sheet 2312, `Bear Creek Valley`). This document provides the Environmental Restoration Program with groundwater concentrations for nonradionuclides in the vicinity of the Y-12 Burial Grounds. These data can be used to determine reference concentrations for intermediate and deep groundwater systems.

  9. Strategic Environmental Research & Development Program (SERDP): Phase I and Phase II Strategic Investment Plans FY 1992 and Interim Status Report of the Council.

    DTIC Science & Technology

    1993-10-01

    VLF/ELF) communication systems, used for early warning and strategic communications, are dependent on the electron densities in the "C" and "D...information into optical or electronic signals that can be remotely monitored. During FY92, an in-depth and definitive assessment of the feasibility...particularly metal finishing and electronics operations. BENEFITS: The broad program described above will provide the opportunity for EPA, the

  10. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    USGS Publications Warehouse

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  11. Lewis and Clark National Historical Park Elk Monitoring Program Annual Report 2010

    USGS Publications Warehouse

    Cole, Carla; Griffin, Paul; Jenkins, Kurt

    2012-01-01

    Data from FY09, FY10, and FY11 will be useful in the formal analyses of trend. Those three years of data will contribute to the preparation of a four-year analysis and report after only one more year. Quantitative estimates of relative use by elk throughout the Fort Clatsop unit will be provided in the four-year report in 2012. Those estimates will account for detection bias, which comes from an incomplete count of elk pellets that were present in the subplots at the time of survey.

  12. Studies and research concerning BNFP: process monitoring and process surveillance demonstration program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kight, H R

    1979-11-01

    Computerized methods of monitoring process functions and alarming off-standard conditions were implemented and demonstrated during the FY 1979 Uranium Run. In addition, prototype applications of instruments for the purpose of tamper indication and surveillance were tested.

  13. 78 FR 50399 - Spectrum Monitoring Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... National Telecommunications and Information Administration (NTIA) to design and conduct a pilot program to... to Congress for fiscal year (FY) 2014 seeks an initial $7.5 million research and development... design, features, deployment options, operational parameters, expected utility, potential benefits, and...

  14. 75 FR 6215 - Agency Information Collection Activity

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    .... SUPPLEMENTARY INFORMATION: I. Abstract During FY10, the Volcano Hazards Program (VHP) will provide funding under the American Recovery and Reinvestment Act (ARRA) for improvement of the volcano and other monitoring systems and other monitoring- related activities that contribute to mitigation of volcano hazards. This...

  15. 75 FR 7448 - Species Recovery Grants to Tribes Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... principal objective of the Program is to support recovery efforts that directly benefit threatened or... management, research, monitoring, and outreach activities or any combination thereof. For FY 2010, NOAA... (NMFS) jurisdiction depends in large part on working cooperatively with other management partners...

  16. Force Projection Technology Overview

    DTIC Science & Technology

    2011-08-12

    Technologies • Fuel Efficient Powertrain Lubricant • Nanotechnology for Fuels and Lubes • Water from Air • Water Reuse • In-line Water Monitoring...purification systems with new pretreatment, desalination and post treatment technologies. Payoff: • Reduces the logistical footprint associated with water...FY11 FY12 FY13 FY14 FY15 FY16 FY17 •Water From Air •Water Quality Monitoring •Water Reuse •Pre and Post Treatment • Desalination 6 5 5

  17. The FY 1980 Department of Defense Program for Research, Development, and Acquisition

    DTIC Science & Technology

    1979-02-01

    materiel. Up to a point, superior performance is an offset to this quantitative disadvantage. Lanchester’s theory of warfare derived simplified relations...intermediate ranges. Underground Test. The next scheduled underground test ( UGT ), MINERS IRON, in FY 1980, will provide engineering and design data on...methods of discriminating between UGTs and earthquakes, and address U.S. capabilities to monitor both the existing Threshold Test Ban Treaty and the

  18. Activities in Idaho; status of projects, fiscal years 1982-83

    USGS Publications Warehouse

    Channel, Linda K.

    1982-01-01

    Twenty-three projects were conducted by the Water Resources Division of the U.S. Geological Survey in Idaho during FY 's (fiscal year) 1982-83. These projects were done in cooperation with seven State and local and nine federal agencies. State and local cooperative funding amounted to $566,123 in FY 1982 and $570,000 (projected monies) in FY 1983; Federal funding amounted to $2,083,748 in FY 1982 and $1,656,494 (projected monies) in FY 1983. Eighty-three persons were employed as of September, FY 1982--40 full time and 43 other than full time. Sixty-five persons were employed as of October, FY 1983--35 full time and 30 other than full time. In addition, the Water Resources Division maintains a project office at the Idaho National Engineering Laboratory. Work there is done in cooperation with the U.S. Department of Energy, which provides most of the funding. Some Federal funds are provided for special projects. Projects other than continuing programs for collection of hydrologic data included flood-mapping studies, geothermal-resource investigations, groundwater-quality assessments, basin-and region-wide water-resource investigations , river quality-of-water monitoring studies, volcanic-ash-related studies, groundwater trends and stream gaging-program evaluations, river erosion and sediment-transport studies, water-budget and groundwater-use determinations, and a sole-source aquifer appraisal. (USGS)

  19. Ecosystem restoration: Chapter 4

    USGS Publications Warehouse

    Cullinane Thomas, Catherine M.; Skrabis, K. E.; Gascoigne, William

    2012-01-01

    The Department of the Interior extensively supports―through its mission, policy, programs, and funding― the study, planning, implementation, and monitoring of ecosystem restoration. This commitment is reflected in the Department's FY2011-2016 Strategic Plan.

  20. Department of Defense Chemical and Biological Defense Program. FY2004-2006 Performance Plan

    DTIC Science & Technology

    2005-03-01

    Agents (NTAs) Compare the direct effects of PAF on smooth muscle, hematic constituents, and lung to determine role in toxicity. Continue to identify...Range Biometric Target ID System Explore technologies for a long range biometric target identification system. Air Containment Monitoring System...Continue development of systems for contained air monitoring for chemical agents.Long Range Biometric Air Containment Monitoring System Continued

  1. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2015 and FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A; Miller, Julianne J; McCurdy, Greg

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff. This activity supports Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closuremore » design and post-closure monitoring program.« less

  2. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2013 and FY2014 (revised)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A.; Miller, Julianne J.; McCurdy, Greg D.

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff, which supports National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closure designmore » and post-closure monitoring program.« less

  3. Evaluation of a Non-Invasive Alternative Glucose Monitor System in Patients with Diabetes Mellitus

    DTIC Science & Technology

    2008-01-07

    Diabetes Mellitus New Protocol Title: Evaluation of a Non-Invasive Alternative Glucose Monitor System in Patients with Diabetes Mellitus PRINCIPAL...Invasive Alternative Glucose Monitor System in Patients with Diabetes Mellitus 5b. GRANT NUMBER Coop Agreement # 05216002 5c. PROGRAM ELEMENT NUMBER...Flexible Medical Systems was approved by the Department of Clinical Investigation at WRAMC in January 2008. FY08 AAMTI funding will support the

  4. Route monitoring program FY 1994

    DOT National Transportation Integrated Search

    1994-12-01

    In Fiscal Year 1994, the Transit Authority of River City (TARC) Kentucky's Research Department completed an on-board ride check of 32 routes. This data was collected and compiled to measure the effectiveness and efficiency of TARC Service on a route ...

  5. Federal Funding for Health Security in FY2018.

    PubMed

    Watson, Crystal; Watson, Matthew; Kirk Sell, Tara

    This article is the latest in an annual series analyzing federal funding for health security programs. It examines proposed funding in the President's Budget Request for FY2018 and provides updated amounts for FY2017 and actual funding for FY2010 through FY2016. The proposed FY2018 budget for health security-related programs represents a significant decrease in funding from prior years and previous administrations. In total, the President's proposed FY2018 budget includes $12.45 billion for health security-related programs, an estimated decrease in funding of $1.25 billion, or 9%, from the estimated $13.71 billion in FY2017 and an 11% decrease from the FY2016 actual funding level of $13.99 billion. Most FY2018 health security funding ($6.67 billion, 54%) would go to programs with multiple-hazard and preparedness goals and missions, representing a 14% decrease in this funding compared to FY2017. Radiological and nuclear security programs would receive 20% ($2.48 billion) of all health security funding, a slight decrease of 2% from the prior year. Biosecurity programs would be funded at $1.53 billion (12% of health security funding) in FY2018, a decrease of 6% compared to FY2017. Chemical security programs would represent 3% ($389.7 million) of all health security funding in FY2018, a 9% decrease from the prior year. Finally, 11% of health security funding ($1.39 billion) would be dedicated to pandemic influenza and emerging infectious diseases programs, the only category of funding to see an increase (3%) above FY2017.

  6. FY2014 National Clean Diesel Funding Assistance (Diesel Emissions Reduction Act) Programmatic Terms and Conditions

    EPA Pesticide Factsheets

    Substantial federal involvement will take the form of monitoring the project by EPA, participation and collaboration between EPA and the recipient in program content, review of project progress, and quantification and reporting ofresults.

  7. Environmental Management System Objectives & Targets Results Summary - FY 2015.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vetter, Douglas W.

    2016-02-01

    Sandia National Laboratories (SNL) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL's operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose ofmore » this document is to summarize the results achieved and documented in FY 2015.« less

  8. Department of the Navy FY 1994 Budget Estimates. DoD Base Realignment and Closure Program 2. (1991 Commission), Justification Data Submitted to Congress April 1991

    DTIC Science & Technology

    1993-04-01

    CA ........... ...................... ... 33 d. Naval Air Facility, Midway Island ..... ............. ... 35 e . Naval Air Station, Moffett Field...closed, removed, or monitored. e ’ In addition, the hazardous waste storage facility will be closed according to regulations. An asbestos inventory...1,939K and 326 enlisted at $11,543K. Other: None. S 7 0 0 0 S I. CO•PRm .• E N T C 2. DATE N ULDN FY 1994 MILITARY CONSTRUCTION PROJECT DATA 3

  9. Federal funding for health security in FY2015.

    PubMed

    Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew

    2014-01-01

    Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs.

  10. ORD GROUND WATER RESEARCH PLAN: STRATEGY FOR FY 1991 AND BEYOND

    EPA Science Inventory

    This document describes a ground water research plan for EPA's Office of Research and Development (ORD). The ground water research program is carried out by ORD's Office of Environmental Processes and Effects Research (OEPER), the Office of Modeling, Monitoring Systems, and Quali...

  11. State Services for California Indians. FY 1980-81.

    ERIC Educational Resources Information Center

    Sanderson, Jack

    Through cooperative efforts of state and federal officials and with concerned California Indians, State program delivery systems are constantly being monitored, evaluated, and adjusted to assure increasingly fair services for California Indians. The report divides State services into five general categories: cultural preservation; educational…

  12. ECUT: Energy Conversion and Utilization Technologies program. Chemical Processes project report, FY 1982

    NASA Technical Reports Server (NTRS)

    Wilcox, R. E. (Compiler)

    1983-01-01

    Planned research efforts and reorganization of the Project as the Biocatalysis Research Activity are described, including the following topics: electrocatalysts, fluid extraction, ammonia synthesis, biocatalysis, membrane fouling, energy and economic analysis, decarboxylation, microscopic reaction models, plasmid monitoring, and reaction kinetics.

  13. Federal Funding for Health Security in FY2015

    PubMed Central

    Sell, Tara Kirk; Watson, Matthew

    2014-01-01

    Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. PMID:24988432

  14. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clapp, R.B.; Marshall, D.S.

    1992-06-01

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show thatmore » the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water.« less

  15. Integrated Medical Information Technology System (IMITS): Information and Clinical Technologies for the Advancement of Healthcare

    DTIC Science & Technology

    2010-08-31

    Teleaudiology o FY08: Remote access of cochlear implants Teleaudiology DIACAP / FDA certification o FY08: Teleaudiology DIACAP and FDA certification to conduct...remote access, monitor, and adjust cochlear implants  ECMO o FY05: Extra Corporeal Membrane Oxygenation (ECMO) o FY07 Pacific Rim ECMO/VAD...These dashboards were developed for use by appointed AFMS radiologists to monitor the flow and statistics of teleradiology. The dashboards are web

  16. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  17. Structural Mechanics Division research and technology plans for FY 1990 and accomplishments for FY 1989

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1990-01-01

    The Objectives, FY 1990 Plans, Approach, and FY 1990 Milestones for the Structural Mechanics Division's research programs are presented. FY 1989 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  18. Structures and Dynamics Division research and technology plans for FY 1986 and accomplishments for FY 1985

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1986-01-01

    Presented are the Objectives, FY 1986 Plans, Approach, and FY 1986 Milestones for the Structures and Dynamics Division's research programs. FY 1985 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  19. Satellite Power System (SPS) FY 79 program summary

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.

  20. Structures and Dynamics Division research and technology plans for FY 1988 and accomplishments for FY 1987

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1988-01-01

    Presented are the Objectives, FY 1988 Plans, Approach, and FY 1988 Milestones for the Structures and Dynamics Division (Langley Research Center) research programs. FY 1987 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  1. Structures and Dynamics Division research and technology plans for FY 1987 and accomplishments for FY 1986

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1987-01-01

    This paper presents the Objectives, FY 1987 Plans, Approach, and FY 1987 Milestones for the Structures and Dynamics Division's research programs. FY 1986 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  2. Structures and Dynamics Division research and technology plans for FY 1985 and accomplishments for FY 1984

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1985-01-01

    The objectives, FY 1985 plans, approach, and FY 1985 milestones for the Structures and Dynamics Division's research programs are presented. The FY 1984 accomplishments are presented where applicable. This information is useful in program coordination with other government organizations in areas of mutual interest.

  3. Central Alaska Network vital signs monitoring plan

    USGS Publications Warehouse

    MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug

    2005-01-01

    Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.

  4. Enhanced surveillance program FY97 accomplishments. Progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauzy, A.; Laake, B.

    1997-10-01

    This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics;more » diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.« less

  5. FY 1998 Proposed Rail Improvement Program Supplement

    DOT National Transportation Integrated Search

    1997-01-01

    This FY 1998 Proposed Rail Improvement Program Supplement contains those rail plan amendments which have been published subsequent to the FY 1997 Proposed Rail Improvement program supplement. This document also contains the benefit/cost methodology u...

  6. 78 FR 17281 - Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... DEPARTMENT OF STATE [Public Notice 8241] Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program There will be a meeting on the President's FY 2014 U.S. Refugee Admissions Program on... meeting's purpose is to hear the views of attendees on the appropriate size and scope of the FY 2014 U.S...

  7. 77 FR 46213 - Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    .... Monitoring Impact of FY 2012 Policy Changes and Certain SNF Practices A. RUG Distributions B. Group Therapy... Common Procedure Coding System HR-III Hybrid Resource Utilization Groups, Version 3 IHS IGI (Information... OCN OMB Control Number OMB Office of Management and Budget OMRA Other Medicare-Required Assessment PPS...

  8. Instrument Description: The Total Solar Irradiance Monitor on the FY-3C Satellite, an Instrument with a Pointing System

    NASA Astrophysics Data System (ADS)

    Wang, Hongrui; Wang, Yupeng; Ye, Xin; Yang, Dongjun; Wang, Kai; Li, Huiduan; Fang, Wei

    2017-01-01

    The Total Solar Irradiance Monitor (TSIM) onboard the nadir Feng Yun-3C (FY-3C) satellite provides measurements of the total solar irradiance with accurate solar tracking and sound thermal stability of its heat sink. TSIM/FY-3C mainly consists of the pointing system, the radiometer package, the thermal control system, and the electronics. Accurate solar tracking is achieved by the pointing system, which greatly improves the science data quality when compared with the previous TSIM/FY-3A and TSIM/FY-3B. The total solar irradiance (TSI) is recorded by TSIM/FY-3C about 26 times each day, using a two-channel radiometer package. One channel is used to perform routine observation, and the other channel is used to monitor the degradation of the cavity detector in the routine channel. From the results of the ground test, the incoming irradiance is measured by the routine channel (AR1) with a relative uncertainty of 592 ppm. A general description of the TSIM, including the instrument modules, uncertainty evaluation, and its operation, is given in this article.

  9. National Water Program FY 2015 Performance, Trends and Best Practices Report

    EPA Pesticide Factsheets

    This Report includes final FY 2015 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2015 National Water Program Guidance Addendum.

  10. National Water Program Performance FY 2017 Trends, and Best Practices Report

    EPA Pesticide Factsheets

    This report includes FY 2017 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2016-2017 National Water Program Guidance.

  11. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixthmore » sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.« less

  12. Advanced Caution and Warning System, Final Report - 2011

    NASA Technical Reports Server (NTRS)

    Spirkovska, Lilly; Aaseng, Gordon; Iverson, David; McCann, Robert S.; Robinson, Peter; Dittemore, Gary; Liolios, Sotirios; Baskaran, Vijay; Johnson, Jeremy; Lee, Charles; hide

    2013-01-01

    The work described in this report is a continuation of the ACAWS work funded in fiscal year (FY) 2010 under the Exploration Technology Development Program (ETDP), Integrated Systems Health Management (ISHM) project. In FY 2010, we developed requirements for an ACAWS system and vetted the requirements with potential users via a concept demonstration system. In FY 2011, we developed a working prototype of aspects of that concept, with placeholders for technologies to be fully developed in future phases of the project. The objective is to develop general capability to assist operators with system health monitoring and failure diagnosis. Moreover, ACAWS was integrated with the Discrete Controls (DC) task of the Autonomous Systems and Avionics (ASA) project. The primary objective of DC is to demonstrate an electronic and interactive procedure display environment and multiple levels of automation (automatic execution by computer, execution by computer if the operator consents, and manual execution by the operator).

  13. Research and technology plans for FY 1989 and accomplishments for FY 1988. [Structural Mechanics Division

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1989-01-01

    The Objectives, FY 1989 Plans, Approach, and FY 1989 Milestones for the Structural Mechanics Division's research programs are presented. Fiscal year 1988 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  14. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A.; Campbell, Scott A.; McCurdy, Greg

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) as a result of storm runoff. This activity supports U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM-NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transportedmore » radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. Air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content are collected at the meteorological station. The maximum, minimum, and average or total values (as appropriate) for each of these parameters are recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrology station are also recorded for every 10-minute interval. This report presents data collected from these stations during fiscal year (FY) 2017.« less

  15. United States Nuclear Data Program (USNDP)

    Science.gov Websites

    Report FY 2016 Annual Report FY 2015 Annual Report FY 2014 Annual Report FY 2013 Annual Report FY 2012 Annual Report FY 2011 Annual Report FY 2010 Annual Report FY 2009 Annual Report FY 2008 Annual Report FY 2007 Annual Report FY 2006 Annual Report FY 2005 Annual Report FY 2004 Final Report FY 2003 Final

  16. Active Sites Environmental Monitoring Program: Mid-FY 1991 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1991-10-01

    This report summarizes the activities of the Active Sites Environmental Monitoring Program (ASEMP) from October 1990 through March 1991. The ASEMP was established in 1989 by Solid Waste Operations and the Environmental Sciences Division to provide early detection and performance monitoring at active low-level radioactive waste (LLW) disposal sites in Solid Waste Storage Area (SWSA) 6 and transuranic (TRU) waste storage sites in SWSA 5 as required by chapters II and III of US Department of Energy Order 5820.2A. Monitoring results continue to demonstrate the no LLW is being leached from the storage vaults on the tumulus pads. Loading ofmore » vaults on Tumulus II began during this reporting period and 115 vaults had been loaded by the end of March 1991.« less

  17. 76 FR 35918 - Susan Harwood Training Grant Program, FY 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2011. Funding Opportunity No.: SHTG-FY-11... of approximately $4.7 million for Susan Harwood Training Program grants under the following...

  18. 75 FR 29783 - Susan Harwood Training Grant Program, FY 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $8 million for the Susan Harwood Training Grant Program for Capacity Building...

  19. United States Military Posture for FY 1987

    DTIC Science & Technology

    1987-01-01

    monitor, plan, and execute mobilization, deployment, employment, and sustainment during peace, crisis, and war. JOPES requirements are being developed ...positioning 68 Deployment Management 69 VI Sustainability 69 Ammunition 69 Petroleum, Oils, and Lubricants 69 Military Construction 69...Commanders in Chiefs 73 Joint Doctrine 73 Combined Doctrine 74 Joint Force Development Process 74 Joint Resource Assessment 75 Joint Program

  20. 75 FR 38837 - Susan Harwood Training Grant Program, FY 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $2.75 million for the Susan Harwood Training Grant Program for Targeted Topic...

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  2. Analysis of Rotary Aircraft Alternatives for NATO SOF Organic Air Wing

    DTIC Science & Technology

    2012-06-01

    analysis with an assumed program start in 2013 and an end in 2019 to determine the impact of short program duration on platform selection. D...FY12 GO\\ LR,~itl\\ l Sli LABOR H13 (J()VI R\\\\iFI\\TSE I AROR FY14 GOVLR\\\\iLI\\ I Sl:. LABOR H15 SI:.PO CSS FY II SII’O CSS FY 12 SEI’() CSS fY 13

  3. 77 FR 5617 - Alternative Transportation in Parks and Public Lands Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... selection of projects, funded with Fiscal Year (FY) 2011 and 2012 appropriations, and previously unallocated... Program FY 2011 FY 2012 Appropriation $26,844,035 $13,450,000 Oversight Deduction (0.5%) (134,500) (67,530... the program are to conserve natural, historical, and cultural resources; reduce congestion and...

  4. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  5. An Assessment of Operational Energy Capability Improvement Fund (OECIF) Programs 17-S-2544

    DTIC Science & Technology

    2017-09-19

    persistently attack key operational energy problems . OECIF themes are summarized in Table 1, and Appendix A includes more detail on the programs within... problems FY 2014 Analytical methods and tools FY 2015 Improving fuel economy for the current tactical ground fleet FY 2016 Increasing the operational...involve a variety of organizations to solve operational energy problems . In FY 2015, the OECIF program received a one-time $14.1M Congressional plus-up

  6. Summary of Awards: FY 1979 and 1980 Program of University Research,

    DTIC Science & Technology

    1980-12-01

    completed. The wind tunnel Timothy M. Barrow, DTS-222 model for correlation of lateral/directional theory is also com- U.S. Department of...of SSOM through generalization and verification MONITOR of the program. The objective is to refine the SSOM to make it Timothy E. Aloney, NRD-12 a...Future Mobility Needs for the Elderly: Development of a Methodology 3. GALLAUDET COLLEGE DOT-OS-501 10 A Study to Identify the Problems that Deaf

  7. Nevada National Security Site-Directed Research and Development FY 2011 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard Bender, comp.

    2012-04-25

    This fiscal year 2011 annual report of the Site-Directed Research and Development program, the 10th anniversary edition, recognizes a full decade of innovative R&D accomplishments in support of the Nevada National Security Site (NNSS). Last year the NNSS itself was renamed to reflect a diversifying mission, and our R&D program has contributed significantly to shape emerging missions that will continue to evolve. New initiatives in stockpile stewardship science, nonproliferation, and treaty verification and monitoring have had substantial successes in FY 2011, and many more accomplishments are expected. SDRD is the cornerstone on which many of these initiatives rest. Historically supportingmore » our main focus areas, SDRD is also building a solid foundation for new, and non-traditional, emerging national security missions. The program continues its charter to advance science and technology for a broad base of agencies including the U.S. Department of Energy (DOE), U.S. Department of Defense (DoD), U.S. Department of Homeland Security (DHS), and many others.« less

  8. Annual Report 1984.

    DTIC Science & Technology

    1985-01-01

    equipped with data collection platforms (DCP) by the end of FY 1985. (b) Communication. The DCP’s transmit the remote gaging station data over the...activated 78 platforms in FY 84 bringing the total number of operating stations to 85. Plans are to activate seven more platforms in FY 85. c. Acoustic... Platforms . The total program cost for FY 1984 is shown in Table VI-3. The total program cost for FY 1985 will be $172,720. (2) National Weather Service

  9. Hanford analytical sample projections FY 1998--FY 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joyce, S.M.

    1998-02-12

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management,more » and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.« less

  10. Mineback Stimulation Research Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warpinski, N.R.

    The Mineback Stimulation Research Program is a systematic study of hydraulic fracturing and the parameters which influence or control fracture geometry or behavior. Fractures are created near a tunnel complex at DOE's Nevada Test Site and are monitored, instrumented, and mined back to observe the effect of treatment, rock and reservoir properties on the fractures. An initial experiment to measure width and pressure in a hydraulic fracture was completed in FY 1983. The test showed that pressure drops along fractures are much larger than predicted, with the result that fractures are shorter, higher, and wider than present models estimate. Themore » cause of this is the complex morphology of hydraulic fractures, including a hierarchy of roughnesses, multiple stranding, and corners, such as the offsets which occur when natural fractures are intersected. A test to study flow behavior in hydraulic fractures with proppant is proposed for FY 1984. 7 figures.« less

  11. 76 FR 23272 - FY 2011 Emergency Food Assistance Annual Program Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... Emergency Food Assistance Annual Program Statement Pursuant to the Food for Peace Act of 2008 and the Foreign Assistance Act of 1961 (FAA), notice is hereby given that the FY 2011 Emergency Food Assistance... to review, the FY 2011 Emergency Food Assistance Annual Program Statement is available via the Food...

  12. Materials Division research and technology accomplishments for FY 87 and plans for FY 88

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1988-01-01

    The research program of the Materials Division is presented as FY 87 accomplishments and FY 88 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  13. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  14. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  15. Materials Division research and technology accomplishments for FY 89 and plans for FY 90

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1990-01-01

    The research program of the Materials Division is presented as FY-89 accomplishments and FY-90 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  16. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  17. Materials Division research and technical accomplishments for FY 1988 and plans for FY 1989

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1989-01-01

    The research program of the Materials Division is presented as FY-88 accomplishments and FY-89 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material is useful in program coordination with other government organizations, universities, and industry in areas of mutual interest.

  18. Applied Remote Sensing Program (ARSP)

    NASA Technical Reports Server (NTRS)

    Johnson, J. D.; Foster, K. E.; Mouat, D. A.; Miller, D. A.; Conn, J. S.

    1976-01-01

    The activities and accomplishments of the Applied Remote Sensing Program during FY 1975-1976 are reported. The principal objective of the Applied Remote Sensing Program continues to be designed projects having specific decision-making impacts as a principal goal. These projects are carried out in cooperation and collaboration with local, state and federal agencies whose responsibilities lie with planning, zoning and environmental monitoring and/or assessment in the application of remote sensing techniques. The end result of the projects is the use by the involved agencies of remote sensing techniques in problem solving.

  19. NASA earth science and applications division: The program and plans for FY 1988-1989-1990

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.

  20. Federal agency biodefense funding, FY2012-FY2013.

    PubMed

    Franco, Crystal; Sell, Tara Kirk

    2012-06-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2012. This article updates those figures with budgeted amounts for FY2013, specifically analyzing the budgets and allocations for civilian biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. As in previous years, our analysis indicates that the majority (>90%) of the "biodefense" programs included in the FY2013 budget have both biodefense and non-biodefense goals and applications-that is, programs to improve infectious disease research, public health and hospital preparedness, and disaster response more broadly. Programs that focus solely on biodefense represent a small proportion (<10%) of our analysis, as the federal agencies continue to prioritize all-hazards preparedness. For FY2013, the federal budget for programs focused solely on civilian biodefense totals $574.2 million, and the budget for programs with multiple goals and applications, including biodefense, is $4.96 billion, for an overall total of $5.54 billion.

  1. Laboratory Directed Research and Development Program FY 2006 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sjoreen, Terrence P

    2007-04-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the US Departmental of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, 'Laboratory Directed Research and Development' (April 19, 2006), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2006. The associated FY 2006 ORNL LDRD Self-Assessment (ORNL/PPA-2007/2) provides financial data about themore » FY 2006 projects and an internal evaluation of the program's management process.« less

  2. Beneficial Use of Dredged Material Monitoring Program. 1996 Annual report (Base Year Through Fy1996).

    DTIC Science & Technology

    1997-01-01

    Echinochloa walteri _ Panicum dichotomiflorum _ Leptochloa fascicularis Cynodon dactylon Paspalum distichum Suaeda linearis Xanthium strumarium ...fascicularis Cynodon dactylon Paspalum distichum Salicornia bigelovii Atriplex pentandra Suaeda linearis Conyza canadensis Xanthium strumarium ...marshes, low fields Xanthium strumarium L cocklebur annual; waste places, old fields, pond shores, ditches, stable dune areas, beaches 5A-6 U.S

  3. 76 FR 16388 - Fees for Reviews of the Rule Enforcement Programs of Contract Markets and Registered Futures...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... charges fees to designated contract markets and registered futures associations to recover the costs..., as explained below. The FY 2010 fee includes adjustments to program costs incurred in FY 2008 and 2009, which are being revised as a result of an internal review of program costs. The FY 2010 fee...

  4. Financial Management for the Office of the Civilian Health and Medical Program of the Uniformed Services

    DTIC Science & Technology

    1996-12-27

    consolidated financial statements for FY 1996. The Office of Civilian Health and Medical Program of the Uniformed Services (OCHAMPUS), part of the FY 1995...12.3 billion Defense Health Program, is one of the entities that DoD will include in its FY 1996 consolidated financial statements . The OCHAMPUS

  5. Selected Federal Education Programs That Can Help Middle and High School Students Get an Excellent Education

    ERIC Educational Resources Information Center

    Alliance for Excellent Education, 2006

    2006-01-01

    This document presents a chart titled "Selected Federal Education Programs That Can Help Middle and High School Students Get an Excellent Education." It divides into five columns: (1) "No Child Left Behind" Programs (and Other Reauthorizations); (2) FY 2006 Final Appropriation; (3) FY 2007 Bush Budget; (4) FY 2007 House…

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, GE; Diefenderfer, HL

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation inmore » the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in themore » estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  8. Crop Monitoring Using European and Chinese Medium Resolution Satellite Data

    NASA Astrophysics Data System (ADS)

    Fan, Jinlong; Defourny, Pierre

    2016-08-01

    The European medium resolution satellite data ENVISAT/MERIS were available in 2002 while the Chinese medium resolution spectrometer data with 5 bands in 250m spatial resolution and 15 bands in 1000m onboard Fengyun 3 series satellites became a new data source at the end of the year 2008. Under the framework of Dragon program 3, both teams demonstrated the utilization of medium resolution satellite data in crop monitoring. The Chinese team has made efforts to improve the processing of the Chinese Medium resolution satellite data (MERSI) in order to promote its applications in crop monitoring. The European team has checked and evaluated the processed FY3A/3B MERSI data and inspiring findings have found in terms of the imaging quality and the performance of retrieving LAI and GAI etc. The Chinese team has mapped the winter wheat area in North China Plain in the growing season from 2009 to 2014 with the finely processed FY3A MERSI 250m data. The LAI retrieval algorithm with the FY3 MERSI data was developed based on the in-situ data and other satellite products. The participation of young scientists is critical for the implementation of the project. 4 Chinese master students were involving in this project and the Chinese team hosted a European young master student to carry out research in China in the spring of 2014. Both research teams are looking forward to successful and productive achievements for this Dragon project and new deep cooperation in Dragon 4.

  9. 75 FR 21314 - Medicaid Program; Final FY 2008, Revised Preliminary FY 2009, and Preliminary FY 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... DSH expenditures (mental health facility plus inpatient hospital) applicable to the FY 1995 DSH...

  10. Defense Small Business Innovation Research Program (SBIR). Volume 1. Army Abstracts of Phase 1 Awards from FY 1988 SBIR Solicitation

    DTIC Science & Technology

    1989-05-01

    CONSTRUCTION). CONCEPT ANALYSIS CORP 14789 KEEL ST PLYMOUTH, MI 48170 CONTRACT NUMBER: DAHO -88-C-0942 DR’S WALDEN & GLANCE TITLE: MISSILE GEOMETRY PACKAGE TOPIC...COUNTING STUDY CAN BE UTILIZED TO EVALUATE THE EFFECTIVENESS OF AN EXPLOSION MONITORING SYSTEM. E SMALL BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM - PHASE... EXPLOSIVE OR GROUND PENETRATING MUNITIONS ARE TO BE EVALUATED. IN THAT CASE THE SYSTEM WILL BE ENHANCED WITH SEISMIC SENSORS. THE SEISMIC SIGNALS MAY

  11. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less

  12. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  13. Initial In-flight Results: The Total Solar Irradiance Monitor on the FY-3C Satellite, an Instrument with a Pointing System

    NASA Astrophysics Data System (ADS)

    Wang, Hongrui; Qi, Jin; Li, Huiduan; Fang, Wei

    2017-01-01

    The total solar irradiance (TSI) has been recorded daily since October 2013 by the Total Solar Irradiance Monitor (TSIM) onboard the FY-3C satellite, which is mainly designed for Earth observation. The TSIM has a pointing system to perform solar tracking using a sun sensor. The TSI is measured by two electrical substitution radiometers with traceability to the World Radiation Reference. The TSI value measured with the TSIM on 2 October 2013 is 1364.88 W m^{-2} with an uncertainty of 1.08 W m^{-2}. Short-term TSI variations recorded with the TSIM show good agreement with SOHO/VIRGO and SORCE/TIM. The data quality and accuracy of FY-3C/TSIM are much better than its predecessors on the FY-3A and FY-3B satellites, which operated in a scanning mode.

  14. 75 FR 3752 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2009 HOPE VI Main Street Grants Program... posted its HOPE VI Main Street Grants program NOFA for FY2009 (``NOFA''). The NOFA makes available approximately $4 million in assistance for the HOPE VI Main Street Grants program, which was funded through the...

  15. Do adjusted clinical groups eliminate incentives for HMOs to avoid substance abusers? Evidence from the Maryland Medicaid HealthChoice program.

    PubMed

    Ettner, Susan L; Johnson, Steven

    2003-01-01

    The adequacy of risk adjustment to eliminate incentives for managed care organizations (MCOs) to avoid enrolling costly patients had been questioned. This study explored systematic differences in expenditures between beneficiaries with and without substance disorders assigned to the same capitation rate group under the Maryland Medicaid HealthChoice program. The investigators used fiscal year (FY) 1995 to 1997 Medicaid data to assign beneficiaries to rate cells based on FY 1995 diagnoses and compared the distribution of expenditures for beneficiaries with and without substance disorders, defined using FY 1997 and FY 1995 diagnoses. Results showed that differences in FY 1997 expenditures between beneficiaries with and without FY 1995 substance disorders were negligible. However, MCOs could expect greater average losses and lower average profits on beneficiaries with FY 1997 substance disorders. Thus, the adjusted clinical groups methodology used to adjust capitation payments in the HealthChoice program attenuated, but did not eliminate, financial incentives for MCOs to avoid substance abusers.

  16. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Will

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less

  17. Clinical Investigation Program Report FY90

    DTIC Science & Technology

    1990-10-01

    Postpartum Blues and Associated Factors in a 𔃾ilitary 52 90-6 Population. (C) (PR) 1990 Changes in Nutritional Statu: and Physical Conditioning 53 90-g...116 90-26 to the Nutritional Status of Anorectic Head and Neck Cancer Patients Currently Undergoing Radiation Therapy. (0) 1990 Training General...saturation monitoring. Problems Critical Care. (In Press) Charney PJ, Martindale RG: The relationship of nutritional status at diagnosis to survival

  18. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Appel, Gordon John

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  19. The America Supports You Program

    DTIC Science & Technology

    2008-12-12

    Federal Acquisition Regulation Part 31 and appropriation laws. (finding C). The American Forces Information Service, working under the authority...adequacy of program funding in the FY 2007-2009 [sic] as submitted in the American Forces Information Service budget estimate submission. The ASD (PA) in...From FY 2005 through FY 2007, the ASY program received $9.2 million of appropriated funds from American Forces Information Service (AFIS) and from the

  20. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs - FY 2008 Budget Request

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2007-03-01

    This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).

  1. Notification: Background Investigation Services Project Notification US Virgin Islands Environmental Program Evaluation

    EPA Pesticide Factsheets

    Projects #OPE-FY14-0004, OPE-FY14-0005 and OPE-FY14-0006, October 30, 2013. The EPA OIG plans to begin preliminary research on October 30, 2013 into the environmental programs the US Virgin Islands (USVI) has implemented on EPA’s behalf.

  2. 75 FR 10219 - Solicitation of Applications for the FY 2010 University Center Economic Development Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... of accredited institutions of higher education for FY 2010 University Center Economic Development..., preparing American regions for growth and success in the worldwide economy. Institutions of higher education... of higher education. For FY 2010, the University Center Economic Development Program competition is...

  3. Structures and Dynamics Division research and technology plans for FY 1894 and accomplishments for FY 1982

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1984-01-01

    The Objectives, Expected Results, Approach, and Fiscal Year FY 1984 Milestones for the Structures and Dynamics Division's research programs are examined. The FY 1983 Accomplishments are presented where applicable.

  4. Nondestructive evaluations

    NASA Astrophysics Data System (ADS)

    Kulkarni, S.

    1993-03-01

    This report discusses Nondestructive Evaluation (NDE) thrust area which supports initiatives that advance inspection science and technology. The goal of the NDE thrust area is to provide cutting-edge technologies that have promise of inspection tools three to five years in the future. In selecting projects, the thrust area anticipates the needs of existing and future Lawrence Livermore National Laboratory (LLNL) programs. NDE provides materials characterization inspections, finished parts, and complex objects to find flaws and fabrication defects and to determine their physical and chemical characteristics. NDE also encompasses process monitoring and control sensors and the monitoring of in-service damage. For concurrent engineering, NDE becomes a frontline technology and strongly impacts issues of certification and of life prediction and extension. In FY-92, in addition to supporting LLNL programs and the activities of nuclear weapons contractors, NDE has initiated several projects with government agencies and private industries to study aging infrastructures and to advance manufacturing processes. Examples of these projects are (1) the Aging Airplanes Inspection Program for the Federal Aviation Administration, (2) Signal Processing of Acoustic Signatures of Heart Valves for Shiley, Inc., and (3) Turbine Blade Inspection for the Air Force, jointly with Southwest Research Institute and Garrett. In FY-92, the primary contributions of the NDE thrust area, described in this report, were in fieldable chemical sensor systems, computed tomography, and laser generation and detection of ultrasonic energy.

  5. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  6. Space Transportation Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl

    2001-01-01

    This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.

  7. 77 FR 30516 - Tribally Controlled Postsecondary Career and Technical Institutions Program; Final Waivers and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ...For 60-month projects funded in fiscal year (FY) 2007 under the Tribally Controlled Postsecondary Career and Technical Institutions Program (TCPCTIP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order to extend the project period of these current TCPCTIP grantees through FY 2013, or longer, if Congress continues to appropriate funds under the existing TCPCTIP program authority. This action will enable the two current TCPCTIP grantees to seek continuation awards in FY 2012 for their current projects, and we will not announce a new TCPCTIP competition in FY 2012.

  8. Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

    DTIC Science & Technology

    2017-03-21

    the 75th and 76th ships in the class. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (in annual quantities of 3-1-2-2-2) are being...procured under the 10- ship MYP contract for FY2013-FY2017. The Navy, in its budget submission, notes this additional $1 billion in funding for the DDG...two DDG-51s requested for procurement in FY2017 at $3,393.9 million. The ships have received a total of $182.6 million in prior-year advance procurement

  9. Materials science on parabolic aircraft: The FY 1987-1989 KC-135 microgravity test program

    NASA Technical Reports Server (NTRS)

    Curreri, Peter A. (Editor)

    1993-01-01

    This document covers research results from the KC-135 Materials Science Program managed by MSFC for the period FY87 through FY89. It follows the previous NASA Technical Memorandum for FY84-86 published in August 1988. This volume contains over 30 reports grouped into eight subject areas covering acceleration levels, space flight hardware, transport and interfacial studies, thermodynamics, containerless processing, welding, melt/crucible interactions, and directional solidification. The KC-135 materials science experiments during FY87-89 accomplished direct science, preparation for space flight experiments, and justification for new experiments in orbit.

  10. The Navy’s Environmental Program and Opportunities in the Southwest

    DTIC Science & Technology

    2013-08-27

    Achieve RIP for all High Priority IRP Sites FY14 •Achieve RC for 90% of IRP + MRP Sites FY18 •Achieve RC for 95% of IRP + MRP Sites FY21 9 NAVFAC Southwest...8/21/2013 ER,N IRP vs. MRP ($M) NAVFAC SW 0 10 20 30 40 50 60 70 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 4 4 7 7 7 43 54 42 51...50 57 58 58 51 18 15 11 9 MRP IRP 10 NAVFAC Southwest Southwest ER,N Requirements Overall CTC: $766M ~54% IRP; ~46% MRP IRP , $411 MRP

  11. 75 FR 61167 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Housing Counseling Training Program... requirements for HUD's Housing Counseling Training Program NOFA for FY2010. This year's Housing Counseling... improve and standardize the quality of counseling provided by housing counselors employed by...

  12. 76 FR 375 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Rural Innovation Fund Program... requirements for HUD's FY 2010 Rural Innovation Fund Program NOFA. Specifically, this NOFA announces the... Innovation grant funds, along with unobligated and unused funds remaining for the Rural Fund's predecessor...

  13. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  14. Department of Defense Review of the Foreign Comparative Testing Program FY2005-FY2006

    DTIC Science & Technology

    2007-04-01

    Kingdom as a potential alternative to an ongoing domestic development program, which was failing to meet the size, weight , and cost objectives. The...Norway, Switzerland NAMMO, Oerlikon Contraves 0.50 USMC 40mm Training Cartridge MK281 Germany Nico Pyrotechnik 13.14 USMC High Rate-of-Fire .50 Cal...late FY 2003 and, although the system performed as advertised, it did not meet stringent weight requirements. In FY 2005, a down-sized version of

  15. FTA multi-year research program plan (FY 2009 - FY 2013).

    DOT National Transportation Integrated Search

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  16. 76 FR 148 - Medicaid Program; Final FY 2009 and Preliminary FY 2011 Disproportionate Share Hospital...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... health DSH expenditures applicable to the State's FY 1995 DSH allotment by the total computable amount of...

  17. L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2009-09-29

    Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimummore » number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.« less

  18. NREL Photovoltaic Program FY 1996 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's andmore » the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.« less

  19. The National Research Initiative Competitive Grants Program in animal reproduction: changes in priorities and scope relevant to United States animal agriculture.

    PubMed

    Mirando, M A

    2007-03-01

    The National Research Initiative (NRI) Competitive Grants Program is the USDA's major competitive grants program and is administered by the Cooperative State Research, Education, and Extension Service. The NRI was authorized by the US Congress in the 1990 Farm Bill at a funding level of $500 million; however, the maximal NRI appropriation was $181.17 million in fiscal year (FY) 2006. Across all programs, the NRI is mandated to use 40% of its funding to support mission-linked research. Since its inception in 1991, the NRI has funded competitive grants in the discipline of animal reproduction. Before 2004, the Animal Reproduction Program funded a broad range of projects encompassing almost every subdiscipline in reproductive biology of farm animals, including aquatic species important to the aquaculture industry and laboratory animals. During FY 2004, the NRI Animal Reproduction Program narrowed the focus of its funding priorities to 5 issue-based topics in an effort to make greater measurable improvements in a few high-impact areas over the next 10 years. Funding priorities were narrowed further in FY 2006 to 3 subdisciplines based, in part, on recommendations that emerged from a stakeholder workshop conducted by Cooperative State Research, Education, and Extension Service in August 2004. In FY 2003, Congress authorized expenditure of up to 20% of the funds appropriated to the NRI to support projects that integrate at least 2 of the 3 functions of research, education, and extension. In FY 2004, the Animal Reproduction Program included a funding priority for integrated projects focused primarily on infertility in dairy cattle. The program funded its first integrated project in FY 2005. During FY 2002, increased emphasis on justification for the use of model systems (e.g., laboratory animals and in vitro systems) was included in the NRI request for applications. In FY 2006, applications proposing to primarily utilize nonagricultural animal models were excluded from the program. Currently, all proposed studies must be thoroughly justified in terms of their relevance to US animal agriculture and to program priorities identified within the request for applications.

  20. Oak Ridge Associated Universities Technology Transfer Program: Annual report, FY 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-11-01

    Several of ORAU's FY87 technology transfer accomplishments have resulted in improvements in the University Isotope Separator at Oak Ridge (UNISOR), a DOE scientific user facility. UNISOR is a cooperative venture of nine universities, ORAU, Oak Ridge National Laboratory, and the state of Tennessee. Three application assessment records were filed for UNISOR, and a patent waiver was granted for a low-level particle beam monitor and current meter. Some activities in the Medical and Health Sciences Division's biochemistry and nuclear medicine programs have resulted in products with commercialization potential. DOE has granted ORAU a patent waiver for a myocardial imaging agent, andmore » a waiver petition for an antihypertensive neutral lipid has been filed and is pending. In addition, ORAU has signed an agreement with a small business to develop and demonstrate the production capability of a small cyclotron. ORAU will work with industry to explore options for further development and commercialization of all three products.« less

  1. Statewide Transportation Improvement Program - FY 1998-2000 - Proposed Highway & Transit Improvement Program - Draft

    DOT National Transportation Integrated Search

    1997-10-01

    The FY 1998-2000 Statewide Transportation Improvement Program (STIP) is a three-year program of highway and transit projects developed to fulfill the requirements set forth in the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The ...

  2. Supporting Data Amended FY 1992/FY 1993 Biennial Budget Estimate Submitted to Congress - January 1992. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation

    DTIC Science & Technology

    1992-01-01

    dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U

  3. 75 FR 58423 - Notice of Funding Availability for HUD's Fiscal Year (FY) 2010 Lead-Based Paint Hazard Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Availability for HUD's Fiscal Year (FY) 2010 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program; Technical Correction AGENCY: Office of Healthy Homes and Lead Hazard...://www.Grants.gov its Notice of Funding Availability (NOFA) for HUD's FY2010 Lead-Based Paint Hazard...

  4. Federal Agency biodefense funding, FY2011-FY2012.

    PubMed

    Franco, Crystal; Sell, Tara Kirk

    2011-06-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2011. This article updates those figures with budgeted amounts for FY2012, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2012 federal budget for civilian biodefense totals $6.42 billion. Of that total, $5.78 billion (90%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $637.6 million (10%) is budgeted for programs that have objectives solely related to biodefense.

  5. Federal agency biodefense funding, FY2013-FY2014.

    PubMed

    Sell, Tara Kirk; Watson, Matthew

    2013-09-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense.

  6. Federal agency biodefense funding, FY2010-FY2011.

    PubMed

    Franco, Crystal; Sell, Tara Kirk

    2010-06-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through FY2010. This article updates those figures with budgeted amounts for FY2011, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple public health, healthcare, national security, and international security issues in addition to biodefense. The FY2011 federal budget for civilian biodefense totals $6.48 billion. Of that total, $5.90 billion (91%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $577.9 million (9%) is budgeted for programs that deal strictly with biodefense.

  7. Federal Agency Biodefense Funding, FY2013-FY2014

    PubMed Central

    Watson, Matthew

    2013-01-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense. PMID:23906009

  8. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Becker, James M.

    This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor), now Mission Support Alliance (MSA), Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades (2007). Three plantings have been installed on a 4.5-hectare mitigation area to date. This review provides a description and chronology of events, monitoring results, and mitigative actions through fiscal year (FY) 2012. Also provided is a review of the monitoring methods, transect layout, and FY 2012 monitoring activities and results for all planting years. Planting densities and performance criteria stipulated in the MAP were aimed atmore » a desired future condition (DFC) of 10 percent mature sagebrush (Artemisia tridentata ssp wyomingensis) cover. Current recommendations for yielding this DFC are based upon a conceptual model planting of 1000 plants/ha (400/ac) exhibiting a 60-percent survival rate after 5 monitoring years (DOE 2003). Accordingly, a DFC after 5 monitoring years would not be less than 600 plants/ha (240/ac). To date, about 8700 sagebrush plants have been grown and transplanted onto the mitigation site. Harsh site conditions and low seedling survival have resulted in an estimated 489 transplants/ha on the mitigation site, which is 111 plants/ha short of the target DFC. Despite this apparent shortcoming, 71, 91, and 24 percent of the surviving seedlings planted in FY 2007 and FY 2008 and FY 2010, respectively, showed signs of blooming in FY 2012. Blooming status may be a positive indication of future sagebrush recruitment, and is therefore a potential source for reaching the target DFC of 600 plants/ha on this mitigation site over time. Because of the difficulty establishing small transplants on this site, we propose that no additional plantings be considered for this mitigation area and to rely upon the potential recruitment by established seedlings to achieve the mitigation commitment set forth in the MAP of 600 plants/ha.« less

  10. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  11. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  12. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  13. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  14. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  15. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  16. FY11 Facility Assessment Study for Aeronautics Test Program

    NASA Technical Reports Server (NTRS)

    Loboda, John A.; Sydnor, George H.

    2013-01-01

    This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  18. 2016 Targeted AirShed Grant Program - Closed Announcement FY 2016

    EPA Pesticide Factsheets

    Targeted Air Shed Grant Program proposal for FY 2016. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.

  19. 2015 Targeted AirShed Grant Program Grant - Closed Announcement FY 2015

    EPA Pesticide Factsheets

    Targeted Air Shed Grant Program proposal for FY 2015. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walters, T.; Savage, S.; Brown, J.

    At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.

  1. 76 FR 37174 - Capital Investment Program-New Starts and Small Starts Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Capital Investment Program--New Starts... apportionment of the FY 2011 Capital Investment (New Starts and Small Starts) program funds. The funds will be... FY 2011, $1,596,800,000 was appropriated for the Capital Investments Grant Account, which includes...

  2. FY 2016 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.

  3. FY 2017 Annual Performance Report (APR)

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.

  4. FY 2015 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.

  5. Characterization, monitoring, and sensor technology crosscutting program: Technology summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-01

    The purpose of the Characterization, Monitoring, and Sensor Technology Crosscutting Program (CMST-CP) is to deliver appropriate characterization, monitoring, and sensor technology (CMST) to the Office of Waste Management (EM-30), the Office of Environmental Restoration (EM-40), and the Office of Facility Transition and Management (EM-60). The technology development must also be cost effective and appropriate to EM-30/40/60 needs. Furthermore, the required technologies must be delivered and implemented when needed. Accordingly, and to ensure that available DOE and other national resources are focused an the most pressing needs, management of the technology development is concentrated on the following Focus Areas: Contaminant Plumemore » Containment and Remediation (PFA); Landfill Stabilization (LSFA); High-Level Waste Tank Remediation (TFA); Mixed Waste Characterization, Treatment, and Disposal (MWFA); and Facility Deactivation, Decommissioning, and Material Disposition (FDDMDFA). Brief descriptions of CMST-CP projects funded in FY95 are presented.« less

  6. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The NASA Research and Technology program for FY 1978 is represented by this compilation of the 'Summary' portions of each of the Research and Technology Objectives and Plans (RTOPS). The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section contains citations and abstracts of the RTOPs. Following this section are four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  7. Appendix F: FreedomCAR and Vehicle Technologies Program inputs for FY 2008 benefits estimates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  8. DOE Solar Energy Technologies Program FY 2005 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sutula, Raymond A.

    The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the program for fiscal year 2005. In particular, the report describes R&D performed by the Program’s national laboratories and university and industry partners.

  9. FY 2009-11 Operating Budget for Higher Education: Appropriations Committee Recommendations. Highlights

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2009

    2009-01-01

    This report explains that the General Fund budget: (1) calls for $1,565.4 million for the FY 2009-11 biennium, including $781.2 million in FY 2010 and $784.2 million in FY 2011; and (2) maintains the State's primary student financial aid programs at FY 2009 funding levels, with Connecticut Aid to Charter Oak funded at 80.0 percent of full funding…

  10. 77 FR 43301 - Medicaid Program; Disproportionate Share Hospital Allotments and Institutions for Mental Diseases...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... increase in the CPI-U for the prior FY (0.0 percent). Column F FY 2010 TC MAP Exp. Incl. DSH. This column... including DSH expenditures. Column G FY 2010 TC MAP Exp. Net of DSH. This column contains the amount of the States' actual FY 2010 total computable DSH expenditures. Column H FY 2010 TC MAP Exp. Net of DSH. This...

  11. RESULTS OF TRITIUM TRACKING AND GROUNDWATER MONITORING AT THE HANFORD SITE 200 AREA STATE APPROVED LAND DISPOSAL SITE FY2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ERB DB

    2008-11-19

    The Hanford Site's 200 Area Effluent Treatment Facility (ETF) processes contaminated aqueous wastes derived from Hanford Site facilities. The treated wastewater occasionally contains tritium, which cannot be removed by the ETF prior to the wastewater being discharged to the 200 Area State-Approved Land Disposal Site (SALDS). During the first 11 months of fiscal year 2008 (FY08) (September 1, 2007, to July 31, 2008), approximately 75.15 million L (19.85 million gal) of water were discharged to the SALDS. Groundwater monitoring for tritium and other constituents, as well as water-level measurements, is required for the SALDS by State Waste Discharge Permit Numbermore » ST-4500 (Ecology 2000). The current monitoring network consists of three proximal (compliance) monitoring wells and nine tritium-tracking wells. Quarterly sampling of the proximal wells occurred in October 2007 and in January/February 2008, April 2008, and August 2008. The nine tritium-tracking wells, including groundwater monitoring wells located upgradient and downgradient of the SALDS, were sampled in January through April 2008. Water-level measurements taken in the three proximal SALDS wells indicate that a small groundwater mound is present beneath the facility, which is a result of operational discharges. The mound increased in FY08 due to increased ETF discharges from treating groundwater from extraction wells at the 200-UP-l Operable Unit and the 241-T Tank Farm. Maximum tritium activities increased by an order of magnitude at well 699-48-77A (to 820,000 pCi/L in April 2008) but remained unchanged in the other two proximal wells. The increase was due to higher quantities of tritium in wastewaters that were treated and discharged in FY07 beginning to appear at the proximal wells. The FY08 tritium activities for the other two proximal wells were 68,000 pCi/L at well 699-48-77C (October 2007) and 120,000 pCi/L at well 699-48-77D (October 2007). To date, no indications of a tritium incursion from the SALDS have been detected in the tritium-tracking wells. Concentrations of all chemical constituents were within Permit limits or were below method detection limits when sampled during FY08. A summary of the chemical constituent concentrations or method detection limits is provided in Table 3-2 in the main text discussion. This report presents the results of groundwater monitoring and tritium-tracking samples from the SALDS facility during FY08. Due to the 30-day laboratory turnaround for analysis of proximal well groundwater samples, this report addresses available date extending from August 1, 2007, through September 30, 2008 (August 2007 data were not included in the FY07 report). Updated background information, which is necessary to understand the results of the groundwater analyses, is also provided on facility operations. Interpretive discussions and recommendations for future monitoring are also provided, where possible.« less

  12. 2009 DOE Vehicle Technologies Program Annual Merit Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2009-10-01

    Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.

  13. 76 FR 34683 - Withdrawal of Notices Inviting Applications for New Awards for Fiscal Year (FY) 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... (FY) 2011; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies (IRS) Program; et al. AGENCY: Office of Postsecondary Education, Department of...; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies...

  14. 75 FR 25913 - Alternative Transportation in Parks and Public Lands Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... Fiscal Year (FY) 2009 appropriations for the Paul S. Sarbanes Transit in Parks program (formally the... $464,027 will be added to available FY 2010 appropriations for the program. A total of 80 applicants... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...

  15. Idaho National Laboratory Cultural Resource Monitoring Report for FY 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brenda R. Pace; Julie B. Braun

    2009-10-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2009 (FY 2009). Throughout the year, thirty-eight cultural resource localities were revisited including: two locations with Native American human remains, one of which is a cave, two additional caves, twenty-two prehistoric archaeological sites, six historic homesteads, two historic stage stations, two historic trails, and two nuclear resources, including Experimental Breeder Reactor-I, which is a designated National Historic Landmark. Several INL project areas were also monitored in FY 2009 to assess project compliance with cultural resource recommendations and monitormore » the effects of ongoing project activities. Although impacts were documented at a few locations and trespassing citations were issued in one instance, no significant adverse effects that would threaten the National Register eligibility of any resources were observed. Monitoring also demonstrated that several INL projects generally remain in compliance with recommendations to protect cultural resources.« less

  16. Technology transfer

    NASA Technical Reports Server (NTRS)

    Penaranda, Frank E.

    1992-01-01

    The topics are presented in viewgraph form and include the following: international comparison of R&D expenditures in 1989; NASA Technology Transfer Program; NASA Technology Utilization Program thrusts for FY 1992 and FY 1993; National Technology Transfer Network; and NTTC roles.

  17. Nevada Test Site-Directed Research and Development, FY 2007 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wil Lewis, editor

    2008-02-20

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving frommore » SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.« less

  18. FY 2016 Grant Announcement: FY 2016 Technical Analysis and Programmatic Evaluation Support to the Chesapeake Bay Program Partnership

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a Request for Proposals for applicants to provide the Chesapeake Bay Program partners with a proposal(s) for providing technical analysis and programmatic evaluation

  19. 75 FR 79419 - Training and Employment Guidance (TEGL) Letter No. 13-10: Fiscal Year (FY) 2011 State Initial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ...) Letter No. 13-10: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting...-10 entitled, FY 2011 State Initial Allocations and the Process for Requesting Additional TAA Program... INFORMATION: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting Additional Trade...

  20. Federal Funding for Health Security in FY2016.

    PubMed

    Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew

    2015-01-01

    This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa.

  1. Federal Funding for Health Security in FY2016

    PubMed Central

    Sell, Tara Kirk; Watson, Matthew

    2015-01-01

    This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa. PMID:26042863

  2. Planning and Budgeting for Nutrition Programs in Tanzania: Lessons Learned From the National Vitamin A Supplementation Program.

    PubMed

    Lyatuu, Margaret Benjamin; Mkumbwa, Temina; Stevenson, Raz; Isidro, Marissa; Modaha, Francis; Katcher, Heather; Dhillon, Christina Nyhus

    2016-05-03

    Micronutrient deficiency in Tanzania is a significant public health problem, with vitamin A deficiency (VAD) affecting 34% of children aged 6 to 59 months. Since 2007, development partners have worked closely to advocate for the inclusion of twice-yearly vitamin A supplementation and deworming (VASD) activities with budgets at the subnational level, where funding and implementation occur. As part of the advocacy work, a VASD planning and budgeting tool (PBT) was developed and is used by district officials to justify allocation of funds. Helen Keller International (HKI) and the Tanzania Food and Nutrition Centre (TFNC) conduct reviews of VASD funds and health budgets annually in all districts to monitor the impact of advocacy efforts. This paper presents the findings of the fiscal year (FY) 2010 district budget annual review. The review was intended to answer the following questions regarding district-level funding: (1) how many funds were allocated to nutrition-specific activities in FY 2010? (2) how many funds were allocated specifically to twice-yearly VASD activities in FY 2010? and (3) how have VASD funding allocations changed over time? Budgets from all 133 districts in Tanzania were accessed, reviewed and documented to identify line item funds allocated for VASD and other nutrition activities in FY 2010. Retrospective data from prior annual reviews for VASD were used to track trends in funding. The data were collected using specific data forms and then transcribed into an excel spreadsheet for analysis. The total funds allocated in Tanzania's districts in FY 2010 amounted to US$1.4 million of which 92% were for VASD. Allocations for VASD increased from US$0.387 million to US$1.3 million between FY 2005 and FY 2010. Twelve different nutrition activities were identified in budgets across the 133 districts. Despite the increased trend, the percentage of districts allocating sufficient funds to implement VAS (as defined by cost per child) was just 21%. District-driven VAS funding in Tanzania continues to be allocated by districts consistently, although adequacy of funding is a concern. However, regular administrative data point to fairly high and consistent coverage rates for VAS across the country (over 80% over the last 10 years). Although this analysis may have omitted some nutrition-specific funding not identified in district budget data, it represents a reliable reflection of the nutrition funding landscape in FY 2010. For this year, total district nutrition allocations add up to only 2% of the amount needed to implement nutrition services at scale according to Tanzania's National Nutrition Strategy Implementation Plan. VASD advocacy and planning support at the district level has succeeded in ensuring district allocations for the program. To promote sustainable implementation of other nutrition interventions in Tanzania, more funds must be allocated and guidance must be accompanied by tools that enable planning and budgeting at the district level. © 2016 by Kerman University of Medical Sciences

  3. Planning and Budgeting for Nutrition Programs in Tanzania: Lessons Learned From the National Vitamin A Supplementation Program

    PubMed Central

    Lyatuu, Margaret Benjamin; Mkumbwa, Temina; Stevenson, Raz; Isidro, Marissa; Modaha, Francis; Katcher, Heather; Dhillon, Christina Nyhus

    2016-01-01

    Background: Micronutrient deficiency in Tanzania is a significant public health problem, with vitamin A deficiency (VAD) affecting 34% of children aged 6 to 59 months. Since 2007, development partners have worked closely to advocate for the inclusion of twice-yearly vitamin A supplementation and deworming (VASD) activities with budgets at the subnational level, where funding and implementation occur. As part of the advocacy work, a VASD planning and budgeting tool (PBT) was developed and is used by district officials to justify allocation of funds. Helen Keller International (HKI) and the Tanzania Food and Nutrition Centre (TFNC) conduct reviews of VASD funds and health budgets annually in all districts to monitor the impact of advocacy efforts. This paper presents the findings of the fiscal year (FY) 2010 district budget annual review. The review was intended to answer the following questions regarding district-level funding: (1) how many funds were allocated to nutrition-specific activities in FY 2010? (2) how many funds were allocated specifically to twice-yearly VASD activities in FY 2010? and (3) how have VASD funding allocations changed over time? Methods: Budgets from all 133 districts in Tanzania were accessed, reviewed and documented to identify line item funds allocated for VASD and other nutrition activities in FY 2010. Retrospective data from prior annual reviews for VASD were used to track trends in funding. The data were collected using specific data forms and then transcribed into an excel spreadsheet for analysis. Results: The total funds allocated in Tanzania’s districts in FY 2010 amounted to US$1.4 million of which 92% were for VASD. Allocations for VASD increased from US$0.387 million to US$1.3 million between FY 2005 and FY 2010. Twelve different nutrition activities were identified in budgets across the 133 districts. Despite the increased trend, the percentage of districts allocating sufficient funds to implement VAS (as defined by cost per child) was just 21%. Discussion: District-driven VAS funding in Tanzania continues to be allocated by districts consistently, although adequacy of funding is a concern. However, regular administrative data point to fairly high and consistent coverage rates for VAS across the country (over 80% over the last 10 years). Although this analysis may have omitted some nutrition-specific funding not identified in district budget data, it represents a reliable reflection of the nutrition funding landscape in FY 2010. For this year, total district nutrition allocations add up to only 2% of the amount needed to implement nutrition services at scale according to Tanzania’s National Nutrition Strategy Implementation Plan. Conclusion: VASD advocacy and planning support at the district level has succeeded in ensuring district allocations for the program. To promote sustainable implementation of other nutrition interventions in Tanzania, more funds must be allocated and guidance must be accompanied by tools that enable planning and budgeting at the district level. PMID:27694649

  4. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-08-02

    called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations

  5. Department of Defense Fiscal Year (FY) 2005 Budget Estimates. Research, Development, Test and Evaluation, Defense-Wide. Volume 1 - Defense Advanced Research Projects Agency

    DTIC Science & Technology

    2004-02-01

    UNCLASSIFIED − Conducted experiments to determine the usability of general-purpose anomaly detection algorithms to monitor a large, complex military...reaction and detection modules to perform tailored analysis sequences to monitor environmental conditions, health hazards and physiological states...scalability of lab proven anomaly detection techniques for intrusion detection in real world high volume environments. Narrative Title FY 2003

  6. High performance computing and communications: FY 1997 implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less

  7. FY 2017 Grant Announcement: FY 2017 Source Reduction Assistance Grant Program

    EPA Pesticide Factsheets

    The EPA Region 10 Pollution Prevention Program is announcing a grant competition for Source Reduction Assistance (SRA) awards. EPA Region 10 anticipates awarding approximately $95,000 in federal grant funding to support SRA agreements.

  8. 77 FR 40628 - HUD's Fiscal Year (FY) 2012 Transformation Initiative: Natural Experiments Research Grant Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5600-N-18-C-1] HUD's Fiscal Year (FY) 2012 Transformation Initiative: Natural Experiments Research Grant Program, Cancellation AGENCY: Office... Availability (NOFA) ``Transformation Initiative: Natural Experiments Grant Program'' on Grants.gov . The close...

  9. FY 2018 Grant Announcement: FY2018 support for Small Water Grant (SWG) and Innovative and Nutrient Sediment Reduction (INSR) Grant

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a request for proposals (RFP) for supporting both the:1.Small Watershed Grants (SWG) program; and 2.Innovative Nutrient and Sediment Reduction (INSR) grants program.

  10. 2015 Fermilab Laboratory Directed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wester, W.

    2016-05-26

    The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less

  11. ORNLs Laboratory Directed Research and Development Program FY 2009 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2010-03-01

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2009. The associated FY 2009 ORNL LDRD Self-Assessment (ORNL/PPA-2010/2) provides financial data andmore » an internal evaluation of the program’s management process.« less

  12. ORNLs Laboratory Directed Research and Development Program FY 2013 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2014-03-01

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2013. The associated FY 2013 ORNL LDRD Self-Assessment (ORNL/PPA-2014/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  13. ORNLs Laboratory Directed Research and Development Program FY 2008 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2009-03-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and anmore » internal evaluation of the program’s management process.« less

  14. ORNLs Laboratory Directed Research and Development Program FY 2012 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-03-01

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2012. The associated FY 2012 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  15. Microgravity science and applications. Program tasks and bibliography for FY 1994

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground-based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. ATD (Advanced Technology Development) program task descriptions are also included. The bibliography cites the related PI (Principal Investigator) publications and presentations for these program tasks in FY 1994. Three appendices include Table of Acronyms, Guest Investigator Index, and Principal Investigator Index.

  16. Microgravity science & applications. Program tasks and bibliography for FY 1995

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. Advanced technology development (ATD) program task descriptions are also included. The bibliography cites the related principle investigator (PI) publications and presentations for these program tasks in FY 1994. Three appendices include a Table of Acronyms, a Guest Investigator index and a Principle Investigator index.

  17. 2008 Federal Energy Management Program (FEMP) Market Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  18. Five-Year Plan (FY04-FY-08) for the Manufacturing Technology (ManTech) Program. Supplement to the FY03 - FY07 Plan

    DTIC Science & Technology

    2003-07-01

    magnetorheological (MRF) finishing to reduce surface roughness in half the time of previous processes . Improved image quality directly supports improved...affordably polish the inside surface of small tight free form optics to a finish on the order of 3 angstroms. • Demonstrate cycle time reduction...processes and controls for steel, titanium, and superalloys. FY2007: • Demonstrate an improved superfine finishing for optical components to

  19. Description and primary results of Total Solar Irradiance Monitor, a solar-pointing instrument on an Earth observing satellite

    NASA Astrophysics Data System (ADS)

    Wang, Hongrui; Fang, Wei; Li, Huiduan

    2015-04-01

    Solar driving mechanism for Earth climate has been a controversial problem for centuries. Long-time data of solar activity is required by the investigations of the solar driving mechanism, such as Total Solar Irradiance (TSI) record. Three Total Solar Irradiance Monitors (TSIM) have been developed by Changchun Institute of Optics, Fine Mechanics and Physics for China Meteorological Administration to maintain continuities of TSI data series which lasted for nearly 4 decades.The newest TSIM has recorded TSI daily with accurate solar pointing on the FY-3C meteorological satellite since Oct 2013. TSIM/FY-3C has a pointing system for automatic solar tracking, onboard the satellite designed mainly for Earth observing. Most payloads of FY-3C are developed for observation of land, ocean and atmosphere. Consequently, the FY-3C satellite is a nadir-pointing spacecraft with its z axis to be pointed at the center of the Earth. Previous TSIMs onboard the FY-3A and FY-3B satellites had no pointing system, solar observations were only performed when the sun swept through field-of-view of the instruments. And TSI measurements are influenced inevitably by the solar pointing errors. Corrections of the solar pointing errors were complex. The problem is now removed by TSIM/FY-3C.TSIM/FY-3C follows the sun accurately by itself using its pointing system based on scheme of visual servo control. The pointing system is consisted of a radiometer package, two motors for solar tracking, a sun sensor and etc. TSIM/FY-3C has made daily observations of TSI for more than one year, with nearly zero solar pointing errors. Short time-scale variations in TSI detected by TSIM/FY-3C are nearly the same with VIRGO/SOHO and TIM/SORCE.Instrument details, primary results of solar pointing control, solar observations and etc will be given in the presentation.

  20. NREL photovoltaic program FY 1997 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less

  1. 77 FR 64809 - Reallotment of FY 2011 Funds for the Low Income Home Energy Assistance Program (LIHEAP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Reallotment of FY... of Fiscal Year (FY) 2011 funds may be available for re-allotment. After a 30-day comment period, this amount has not changed. This notice announces that $3,089,920 was reallotted on September 26, 2012 to FY...

  2. Financial Summary Tables. Department of Defense Budget for Fiscal Year 1979

    DTIC Science & Technology

    1978-01-01

    79 Q FAD 740 - Object Classification Distribution of Direct and Reimbursable Obligations, FY 77, FY 78 and FY 79 .U 762 - FY 1979 Reimbursable Program...FAO-738/79 (FILE IN VOL. It JAN 23, 1978 PAGE 1 UOGET BALANCES REIMBURSABLE RECOVERIES TOTAL DIRECT OBLIGATIONS...m.---- .---- ...------.m.---- -..m.----.......---e e e ee-- - - - DIRECT OBLIGATIONS REIMBURSABLE TOTAL WRITEOFFS UNOBLIGATED UNOBLIGATED

  3. VA/DoD Joint Executive Council FY 2009: Joint Strategic Plan FY 2010-2012

    DTIC Science & Technology

    2009-01-01

    through the Military Health System (MHS) Population Health Portal . HEC Traumatic Brain Injury and Psychological Health In FY 2009, VA and DoD made...available using the Deployment Occupational and Environmental Health Surveillance Portal . TBI and MH assessment tools were evaluated and monitored through...with increased access, VA maintained the frequency of encounters for treatment of PTSD and other MH conditions in Veterans of prior eras. To forecast

  4. Military needs and forecast, 2

    NASA Technical Reports Server (NTRS)

    Goldstayn, Alan B.

    1986-01-01

    FORECAST 2 has accomplished its objectives of identifying high leverage technologies for corporate Air Force review. Implementation is underway with emphasis on restructuring existing programs and programming resources in the FY88 BES/FY89 POM. Many joint service/agency opportunities exist.

  5. The Department of the Navy Subcontracting Program Update

    DTIC Science & Technology

    2014-08-01

    calculaCon  of  single  FY   acCvity  at  the  contract  level   Tot   Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014   Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0

  6. 2012 Wind Program Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zayas, Jose; Higgins, Mark

    2012-06-01

    This report summarizes the proceedings of the 2012 Wind Program Peer Review, the goals of which were to review and evaluate the strategy and goals of the Wind Program; review and evaluate the progress and accomplishments of the program's projects funded in fiscal year (FY) 2010 and FY 2011; and foster interactions among the national laboratories, industry, and academic institutions conducting research and development on behalf of the program.

  7. DOE Solar Energy Technologies Program FY 2005 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2005. In particular, the report describes R&D performed by the Program?s national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.

  8. 75 FR 37779 - Office of Elementary and Secondary Education; Smaller Learning Communities Program; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.215L] Office of Elementary and Secondary Education; Smaller Learning Communities Program; Notice Inviting Applications for New Awards Using Fiscal Year (FY) 2009 Funds... applications for new awards using fiscal year (FY) 2009 funds for the Smaller Learning Communities Program...

  9. FY2015 Analysis of the Teamwork USA Program. Memorandum

    ERIC Educational Resources Information Center

    Howard, Mark

    2015-01-01

    The Department of Research and Evaluation (DRE) has completed an analysis of the performance of students who participated in the Teamwork USA Program, administered in FY2014 at three District schools. Teamwork USA hopes to improve student achievement at select Title I elementary schools via its Instrumental Music Program grant. This memorandum to…

  10. LDRD FY 2014 Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anita Gianotto; Dena Tomchak

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  11. State Training & Employment Program. Program Review for FY99-FY01.

    ERIC Educational Resources Information Center

    Cordova, Lorraine

    Alaska's State Training and Employment Program (STEP) was designed with the primary objective of reducing current and future claims against Unemployment Insurance (UI) benefits by providing training to those who are unemployed or facing unemployment. STEP is also charged with fostering growth of existing businesses and attracting new businesses to…

  12. Annual Defense Department Report FY 1973

    DTIC Science & Technology

    1972-02-22

    program of combatting Sickle- Cell Anemia. Finally, as we approach an all-volunteer force we will continually assess our recruiting and retention programs...GNP devoted to Defense continues to decline -- from 7.0% in FY 1972 to 6.4% in FY 1973. This is a 22 year low. 59 We also are requesting a suplemental ...complement Total Force Planning. Some of these initiatives will fall in areas where the U.S. bears the primary responsibility, while others stem from

  13. FY 1998 Proposed Rail Improvement Program Supplement Update - Bloomington II

    DOT National Transportation Integrated Search

    1997-07-01

    The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement : is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning track rehabilitation and new track co...

  14. FY 1998 Proposed Rail Improvement Program Supplement Update - Pontiac

    DOT National Transportation Integrated Search

    1997-07-01

    The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning new track construction at the Prairie C...

  15. FY 2018 Grant Announcement: FY2018 Support for Geospatial Analysis Support

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency’s (EPA) Chesapeake Bay Program Office (CBPO) is announcing a Request for Proposals (RFP) for applicants to provide the Chesapeake Bay Program (CBP) partners with a proposal for providing geospatial analysis support

  16. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butcher, T.; Swingle, R.; Crapse, K.

    2011-01-01

    The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less

  17. FY2013 Defense Budget Request: Overview and Context

    DTIC Science & Technology

    2012-04-20

    Prescribed by ANSI Std Z39-18 FY2013 Defense Budget Request: Overview and Context Congressional Research Service Summary This report analyzes ...Congressional action on the FY2013 defense budget will be analyzed in a separate report. The FY2013 Department of Defense (DOD) budget request...defense-related nuclear programs conducted by the Department of Energy , and other activities. For discretionary DOD budget authority, the request includes

  18. NASA's Microgravity Research Program

    NASA Technical Reports Server (NTRS)

    Woodard, Dan

    1998-01-01

    This fiscal year (FY) 1997 annual report describes key elements of the NASA Microgravity Research Program (MRP) as conducted by the Microgravity Research Division (MRD) within NASA's Office of Life and Microgravity, Sciences and Applications. The program's goals, approach taken to achieve those goals, and program resources are summarized. All snapshots of the program's status at the end of FY 1997 and a review of highlights and progress in grounds and flights based research are provided. Also described are major space missions that flew during FY 1997, plans for utilization of the research potential of the International Space Station, the Advanced Technology Development (ATD) Program, and various educational/outreach activities. The MRP supports investigators from academia, industry, and government research communities needing a space environment to study phenomena directly or indirectly affected by gravity.

  19. Medicare program; prospective payment system and consolidated billing for skilled nursing facilities for FY 2010; minimum data set, version 3.0 for skilled nursing facilities and Medicaid nursing facilities. Final rule.

    PubMed

    2009-08-11

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs), for fiscal year (FY) 2010. In addition, it recalibrates the case-mix indexes so that they more accurately reflect parity in expenditures related to the implementation of case-mix refinements in January 2006. It also discusses the results of our ongoing analysis of nursing home staff time measurement data collected in the Staff Time and Resource Intensity Verification project, as well as a new Resource Utilization Groups, version 4 case-mix classification model for FY 2011 that will use the updated Minimum Data Set 3.0 resident assessment for case-mix classification. In addition, this final rule discusses the public comments that we have received on these and other issues, including a possible requirement for the quarterly reporting of nursing home staffing data, as well as on applying the quality monitoring mechanism in place for all other SNF PPS facilities to rural swing-bed hospitals. Finally, this final rule revises the regulations to incorporate certain technical corrections.

  20. INL Cultural Resource Monitoring Report for FY 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Olson, Christina Liegh; Gilbert, Hollie Kae

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year (FY) 2015. Throughout the year, 67 total monitoring visits were completed, with several especially sensitive resources visited on more than one occasion. Overall, FY 2015 monitoring included surveillance of the following 49 individual cultural resource localities: three locations with human remains, one of which is also a cave; nine additional caves; twenty prehistoric archaeological sites; five historic archaeological sites; two historic trails; Experimental Breeder Reactor I (EBR-I), a National Historic Landmark; Aircraft Nuclear Propulsion (ANP) objects located atmore » EBR-I; and eight Arco Naval Proving Ground (NPG) property types. Several INL work processes and projects were also monitored to confirm compliance with original INL CRM recommendations and assess the effects of ongoing work. On two occasions, ground disturbing activities within the boundaries of the Power Burst Facility/Critical Infrastructure Test Range Complex (PBF/CITRC) were observed by INL CRM staff prepared to respond to any additional finds of Native American human remains. Finally, the current location housing INL Archives and Special Collections was evaluated once. Most of the cultural resources monitored in FY 2015 exhibited no adverse impacts, resulting in Type 1 impact assessments. However, Type 2 impacts were noted 13 times. In one case, a portion of a historic trail was graded without prior review or coordination with the INL CRM Office, resulting in impacts to the surface of the trail and one archaeological site. Evidence of unauthorized artifact collection/ looting was also documented at three archaeological sites located along INL powerlines. Federal agents concluded a FY 2012 investigation by filing civil charges and levying fine under the Archaeological Resource Protection Act against one INL employee for this kind of illegal removal of artifacts from INL lands. Goodale‘s Cutoff of the Oregon Trail showed evidence of heavy use associated with grazing. A number of previously reported Type 2 impacts were also once again documented at the EBR-I National Historic Landmark, including spalling and deterioration of bricks due to inadequate drainage, minimal maintenance, and rodent infestation. The ANP engines and locomotive on display at the EBR-I Visitors Center also exhibited impacts related to long term exposure. Finally, most of the Arco NPG properties monitored at Central Facilities Area exhibited problems with lack of timely and appropriate maintenance as well as inadequate drainage. No new Type 3 or Type 4 impacts that adversely affected significant cultural resources and threatened National Register eligibility were documented in FY 2015.« less

  1. U.S. Department of Transportation : FY 1998 budget in brief

    DOT National Transportation Integrated Search

    1998-01-01

    The fiscal year (FY) 1998 budget request for DOT makes a down payment on meeting the : transportation challenges of the 21st century. A total of $38.4 billion is proposed to support : transportation programs in FY 1998. This is approximately one perc...

  2. Medicare program; FY 2014 hospice wage index and payment rate update; hospice quality reporting requirements; and updates on payment reform. final rule.

    PubMed

    2013-08-07

    This final rule updates the hospice payment rates and the wage index for fiscal year (FY) 2014, and continues the phase out of the wage index budget neutrality adjustment factor (BNAF). Including the FY 2014 15 percent BNAF reduction, the total 5 year cumulative BNAF reduction in FY 2014 will be 70 percent. The BNAF phase-out will continue with successive 15 percent reductions in FY 2015 and FY 2016. This final rule also clarifies how hospices are to report diagnoses on hospice claims, and provides updates to the public on hospice payment reform. Additionally, this final rule changes the requirements for the hospice quality reporting program by discontinuing currently reported measures and implementing a Hospice Item Set with seven National Quality Forum (NFQ) endorsed measures beginning July 1, 2014, as proposed. Finally, this final rule will implement the hospice Experience of Care Survey on January 1, 2015, as proposed.

  3. Afghanistan: Narcotics and U.S. Policy

    DTIC Science & Technology

    2009-04-21

    Purpose FY2008 Defense Appropriation P.L. 110-116 FY2008 Bridge Fund P.L. 110-161 (Division L ) FY2008 Supplemental P.L. 110-252 (Title...Glasser, “U.S. Backing Helps Warlord Solidify Power,” Washington Post, February 18, 2002; Ron Moreau and Sami Yousafzai, with Donatella Lorch, “Flowers of...dangers of narcotics use and to monitor and prevent drug use. Testimony of Lt. Gen. Walter L . Sharp, Director of Strategic Plans (J-5), Before the

  4. Scout launch vehicle, phases 4 and 5

    NASA Technical Reports Server (NTRS)

    Mccracken, D. C.; Leiss, A.; Horrocks, E. R.; Turpen, N. H.

    1974-01-01

    The historical data of the Scout launch vehicle program for Phases IV and V (vehicles 138 through 177) is presented for the FY 1966 through FY 1971 time period. Technical data and accounting information are detailed to provide a total picture of the program.

  5. ARIES Oxide Production Program Annual Report - FY14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelley, Evelyn A.; Dinehart, Steven Mark

    A summary of the major accomplishments (September), milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program at the close of FY14 is presented in this Executive Summary. Annual accomplishments are summarized in the body of the report.

  6. Notification: Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program

    EPA Pesticide Factsheets

    Project #OPE-FY12-0017, September 17, 2012. We have completed the preliminary research portion ofour evaluation, Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program (OPE FY12-0017) and will now continue into the fieldwork phase.

  7. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The NASA research and technology program for FY 1990 is presented. The summary portions is compiled of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The first section containing citations and abstracts of the RTOPs is followed by four indices: Subject; Technical Monitor; Responsible NASA Organization; and RTOP number.

  8. Bottling Proliferation of the Uranium Genie: Identifying and Monitoring Clandestine Enrichment Programs

    DTIC Science & Technology

    2007-04-01

    Separation The first method used to enrich uranium on a significant scale was developed by the United States as part of the Manhattan Project during...there does not seem to be a easy way to enrich uranium. It has been over 60 years since the 33 Manhattan Project successfully enriched U-235 to...Proliferation, 91-3. 14 The cost of $5B dollars is adjusted to FY96 dollars. Brookings Institution, “The Costs of the Manhattan Project ,” Global Politics

  9. Idaho National Laboratory Cultural Resource Monitoring Report for FY 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brenda R. Pace

    2009-01-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2008 (FY 2008). Throughout the year, 45 cultural resource localities were revisited including: two locations of heightened Shoshone-Bannock tribal sensitivity, four caves, one butte, twenty-eight prehistoric archaeological sites, three historic homesteads, two historic stage stations, one historic canal construction camp, three historic trails, and Experimental Breeder Reactor-I, which is a designated National Historic Landmark. Several INL project areas were also monitored in FY 2008 to assess project compliance with cultural resource recommendations, confirm the locations of previously recordedmore » cultural resources in relation to project activities, to assess the damage caused by fire-fighting efforts, and to watch for cultural materials during ground disturbing activities. Although impacts were documented at a few locations, no significant adverse effects that would threaten the National Register eligibility of any resource were observed. Monitoring also demonstrated that INL projects generally remain in compliance with recommendations to protect cultural resources« less

  10. U.S. Geological Survey science for the Wyoming Landscape Conservation Initiative—2016 annual report

    USGS Publications Warehouse

    Bowen, Zachary H.; Aikens, Ellen; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Chalfoun, Anna D.; Chong, Geneva W.; Eddy-Miller, Cheryl; Garman, Steven L.; Germaine, Stephen S.; Homer, Collin G.; Johnston, Aaron; Kauffman, Matthew J.; Manier, Daniel J.; Melcher, Cynthia P.; Miller, Kirk A.; Walters, Annika W.; Wheeler, Jerrod D.; Wieferich, Daniel; Wilson, Anna B.; Wyckoff, Teal B.; Zeigenfuss, Linda C.

    2018-05-10

    This is the ninth annual report highlighting U.S. Geological Survey (USGS) science and decision-support activities conducted for the Wyoming Landscape Conservation Initiative (WLCI). The activities address specific management needs identified by WLCI partner agencies. In fiscal year (FY) 2016, there were 26 active USGS WLCI science-based projects. Of these 26 projects, one project was new for FY2016, and three were completed by the end of the fiscal year (though final products were still in preparation or review). USGS WLCI projects were grouped under five categories: (1) Baseline Synthesis, (2) Long-Term Monitoring, (3) Effectiveness Monitoring, (4) Mechanistic Studies of Wildlife, and (5) Data and Information Management. Each of these topic areas is designed to address WLCI management needs: identifying key drivers of change, identifying the condition and distribution of key wildlife species and habitats and of species’ habitat requirements, development of an integrated inventory and monitoring strategy, use of emerging technologies and development and testing of innovative methods for maximizing the efficiency and efficacy of monitoring efforts, evaluating the effectiveness of habitat treatment projects, evaluating the responses of wildlife to development, and developing a data clearinghouse and information management framework to support and provide access to results of most USGS WLCI projects.In FY2016, we assisted with updating the WLCI Conservation Action Plan and associated databases as part of the Comprehensive Assessment, and we also assisted with the Bureau of Land Management 2015 WLCI annual report. By the end of FY2016, we completed or had nearly completed assessments of WLCI energy and mineral resources and had submitted a manuscript on modeled effects of oil and gas development on wildlife to a peer-reviewed journal. We also initiated a study on the effects of wind energy on wildlife in the WLCI region. A USGS circular on WLCI long-term monitoring was in review at the end of the fiscal year, and seven projects monitoring water and vegetation (including changes in sagebrush cover and patterns of sagebrush mortality) continued through the year. USGS scientists continued many projects in FY2016 that evaluate the effectiveness of habitat conservation actions (including sagebrush, cheatgrass, and aspen habitat treatments) and provide tools in support of mechanistic studies of wildlife. In FY2016, USGS scientists, along with university and State partners, continued work on five focal wildlife species/communities (pygmy rabbits [Brachylagus idahoensis], greater sage grouse , mule deer, sagebrush songbirds, and native fish). In FY2016, the USGS Information Management Team presented information to WLCI scientists on how USGS tools and resources can be used to fulfill the requirements of new USGS policies regarding data release, data management, and data visualization.

  11. FY2017 Defense Appropriations Fact Sheet: Selected Highlights of H.R. 5293 and S. 3000

    DTIC Science & Technology

    2016-06-17

    legally binding caps on discretionary spending for defense programs and for non-defense programs, which were established by P.L. 114-74, the Bipartisan...funding for FY2017 that (1) exceeds the relevant BBA cap ; and (2) is also exempt from that spending cap because it is classified as funding for so-called...Overseas Contingency Operations (OCO). The 2015 BBA increased binding caps on defense and non-defense discretionary appropriations for FY2016 and

  12. 77 FR 68567 - Announcement of Funding Awards for the Continuum of Care Program for Fiscal Year (FY) 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ...In accordance with section 102(a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of past funding decisions made by the Department in a competition for funding under the FY2011 Notice of Funding Availability (NOFAs) for the Homeless Assistance Grants program. This announcement contains the names of the awardees and the amounts of the awards made available by HUD in FY2011.

  13. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2007-06-12

    up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The

  14. Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2007-10-25

    production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and

  15. Program Direction FY 2017 Budget At-A-Glance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-03-01

    Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.

  16. EVALUATION TECHNIQUES AND TOOL DEVELOPMENT FOR FY 08 CMAQ RELEASE

    EPA Science Inventory

    In this task, research efforts are outlined that relate to the AMD Model Evaluation Program element and support CMAQ releases within the FY05-FY08 time period. Model evaluation serves dual purposes; evaluation is necessary to characterize the accuracy of model predictions, and e...

  17. Medicare Program; Explanation of FY 2004 Outlier Fixed-Loss Threshold as Required by Court Rulings. Clarification.

    PubMed

    2016-01-22

    In accordance with court rulings in cases that challenge the federal fiscal year (FY) 2004 outlier fixed-loss threshold rulemaking, this document provides further explanation of certain methodological choices made in the FY 2004 fixed-loss threshold determination.

  18. GLOBAL CHANGE RESEARCH NEWS #37: PUBLICATION OF "OUR CHANGING PLANET: THE FY 2002 U.S. GLOBAL CHANGE RESEARCH PROGRAM"

    EPA Science Inventory

    The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY 2002 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the Committee on Environment and Natural Reso...

  19. 78 FR 8552 - Announcement of Funding Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Program. This announcement contains the consolidated names and addresses of the award recipients under... Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012 AGENCY: Office of the Assistant Secretary for Public and Indian Housing, HUD. ACTION: Announcement of funding awards. SUMMARY: In accordance...

  20. Tanks Focus Area Site Needs Assessment - FY 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less

  1. San Diego transit five year plan update : FY 1982-1986

    DOT National Transportation Integrated Search

    1981-07-01

    The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...

  2. INDOT Research Program Benefit Cost Analysis—Return on Investment for Projects Completed in FY 2016

    DOT National Transportation Integrated Search

    2017-12-01

    The Governors Office requested an annual financial analysis of the INDOT Research Program to determine the return on the research investment (ROI). The current financial analysis is for research projects that completed in FY 2016. Analyses on prev...

  3. MCSC Office of Small Business Programs (OSBP) Presentation to the Attendees of the Navy Gold Coast MCSC Workshop

    DTIC Science & Technology

    2014-08-13

    Small Business Category FY 2012 Navy Target Percentage FY 2013 Navy Target Percentage Small Business 15.75% 18.00% SDB 5.00% 5.50...9 FY 2013 Achievement Small Business Category FY 13 Target FY 13 Achievement % Difference Small Business 18.00% 29.93% +11.93% SDB 5.50...709,508,809 18.00% 29.93% SDB 704 $351,083,260 5.50% 14.81% VOSB * 462 $130,028,497 0.00% 5.49% SDVOSB 267 $87,214,636 2.00% 3.68% WOSB 327

  4. Development Achievements for Fiscal 1990.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…

  5. Senate FY 2011 NASA Budget Overview

    NASA Image and Video Library

    2010-04-22

    NASA Administrator Charles Bolden is seen on a television monitor as he testifies at a Senate Subcommittee on Commerce, Justice, Science, and Related Agencies of the Appropriations Committee hearing concerning the FY 2011 NASA Budget, Thursday, April 22, 2010 at the Dirksen Senate Office Building in Washington. Photo Credit: (NASA/Bill Ingalls)

  6. Tri-Lab Co-Design Milestone: In-Depth Performance Portability Analysis of Improved Integrated Codes on Advanced Architecture.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoekstra, Robert J.; Hammond, Simon David; Richards, David

    2017-09-01

    This milestone is a tri-lab deliverable supporting ongoing Co-Design efforts impacting applications in the Integrated Codes (IC) program element Advanced Technology Development and Mitigation (ATDM) program element. In FY14, the trilabs looked at porting proxy application to technologies of interest for ATS procurements. In FY15, a milestone was completed evaluating proxy applications in multiple programming models and in FY16, a milestone was completed focusing on the migration of lessons learned back into production code development. This year, the co-design milestone focuses on extracting the knowledge gained and/or code revisions back into production applications.

  7. Food safety and inspection service regulatory testing program for Escherichia coli O157:H7 in raw ground beef.

    PubMed

    Naugle, Alecia Larew; Holt, Kristin G; Levine, Priscilla; Eckel, Ron

    2005-03-01

    We analyzed raw ground beef testing data to determine whether a decrease in the rate of Escherichia coli O157:H7-positive raw ground beef samples has occurred since the inception of Food Safety and Inspection Service (U.S. Department of Agriculture) regulatory actions and microbiological testing concerning this commodity and pathogen. A main effects log-linear Poisson regression model was constructed to evaluate the association between fiscal year and the rate of E. coli O157:H7-positive raw ground beef samples while controlling for the effect of season for the subset of test results obtained from fiscal year (FY)2000 through FY2003. Rate ratios were used to compare the rate of E. coli O157:H7-positive raw ground beef samples between sequential years to identify year-to-year differences. Of the 26,521 raw ground beef samples tested from FY2000 through FY2003, 189 (0.71%) tested positive for E. coli O157:H7. Year-to-year comparisons identified a 50% reduction in the rate of positive ground beef samples from FY2002 to FY2003 when controlling for season (95% CI, 10 to 72% decrease; P = 0.02). This decrease was the only significant year-to-year change in the rate of E. coli O157:H7-positive raw ground beef samples but was consistent in samples obtained from both federally inspected establishments and retail outlets. We believe this decrease is attributed to specific regulatory actions by Food Safety and Inspection Service and subsequent actions implemented by the industry, with the goal of reducing E. coli O157:H7 adulteration of raw ground beef. Continued monitoring is necessary to confirm that the decrease in the rate of E. coli O157:H7 in raw ground beef samples we observed here represents the beginning of a sustained trend.

  8. Medicare Program; FY 2018 Hospice Wage Index and Payment Rate Update and Hospice Quality Reporting Requirements. Final rule.

    PubMed

    2017-08-04

    This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2018. Additionally, this rule includes new quality measures and provides an update on the hospice quality reporting program.

  9. Comprehensive Monitoring Program: Final Air Quality Data Assessment Report for FY90, Version 3.1 Volume 3

    DTIC Science & Technology

    1991-09-01

    Monitoring Stations Figure 4.1-1 X /Q Dispersion for Phase I Figure 4.1-2 X /Q Dispersion for Phase 2-Stage 1 Figure 4.1-3 X /Q Dispersion for Phase 2...Stage 2 Fp Figure 4.1-4 X /Q Dispersion for Phase 3 Figure 4.1-5 X /Q Dispersion for Phase 4 • Figure 4.1-6 Sources of Regulated Pollutants in RMA...Arsenic Results by Phase "Figure 4.4-7 Cadmium Results by Phase Figure 4.4-8 X /Q Dispersion and Basin F Metals for 9/6/88 * Figure 4.4-9 X /Q Dispersion

  10. LBNL Laboratory Directed Research and Development Program FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  11. Logistics Modernization Program System Procure-to-Pay Process Did Not Correct Material Weaknesses

    DTIC Science & Technology

    2012-05-29

    Prevalidation of DOD Commercial Payments,” March 2, 2007 Army U.S. Army Audit Agency Report No. A-2007-0205- FFM , “Logistics Modernization Program...Report No. A-2007-0163- FFM , “FY 03–FY 05 Obligations Recorded in the Logistics Modernization Program,” July 27, 2007 U.S. Army Audit Agency Report No

  12. Military Construction and Family Housing Program. Fiscal Year (FY) 2001 Budget Estimates

    DTIC Science & Technology

    2000-02-01

    Department of the Air Force Military Construction and Family Housing Program Fiscal Year (FY) 2001 Budget Estimates Justification Data...Department of the Air Force Military Construction and Military Family Housing Program Summary Fiscal Year 2001 Appropriation Authorization Request... FISCAL YEAR 2001 (DOLLARS IN THOUSANDS) STATE/COUNTRY INSTALLATION TITLE APPROP REQUEST AUTH REQUEST PAGE INSIDE THE U.S. ALABAMA

  13. Directed Research Program in Reading, Early Childhood, Vocational Education, School Organization and Administration, FY 72 - FY 76.

    ERIC Educational Resources Information Center

    National Center for Educational Research and Development (DHEW/OE), Washington, DC.

    In 1970 the National Center for Educational Research and Development (CER) reviewed United States Office of Education (USOE) Bureau of Research policies over the previous 15 years, and as a result of this review, initiated the Directed Research Program. This program will concentrate funds in four areas of high educational significance and will be…

  14. Evaluating the Productivity of VA, NIH, and AHRQ Health Services Research Career Development Awardees.

    PubMed

    Finney, John W; Amundson, Erin O; Bi, Xiaoyu; Cucciare, Michael A; Eisen, Seth A; Finlay, Andrea K; Halvorson, Max A; Hayashi, Ko; Owens, Douglas K; Maisel, Natalya C; Timko, Christine; Weitlauf, Julie C; Cronkite, Ruth C

    2016-04-01

    To evaluate the academic advancement and productivity of Department of Veterans Affairs Health Services Research and Development (HSR&D) Career Development Award (CDA) program recipients, National Institutes of Health (NIH) K awardees in health services research (HSR), and Agency for Healthcare Research and Quality (AHRQ) K awardees. In all, 219 HSR&D CDA recipients from fiscal year (FY) 1991 through FY2010; 154 NIH K01, K08, and K23 awardees FY1991-FY2010; and 69 AHRQ K01 and K08 awardees FY2000-FY2010 were included. Most data were obtained from curricula vitae. Academic advancement, publications, grants, recognition, and mentoring were compared after adjusting for years since award, and personal characteristics, training, and productivity prior to the award. No significant differences emerged in covariate-adjusted tenure-track academic rank, number of grants as primary investigator (PI), major journal articles as first/sole author, Hirsch h-index scores, likelihood of a journal editorship position or membership in a major granting review panel, or mentoring postgraduate researchers between the HSR&D CDA and NIH K awardees from FY1991-FY2010, or among the three groups of awardees from FY2000 or later. Among those who reported grant funding levels, HSR&D CDAs from FY1991-2010 had been PI on more grants of $100,000 than NIH K awardees. HSR&D CDAs had a higher mean number of major journal articles than NIH K awardees from FY1991-2010. Findings show that all three HSR career development programs are successfully selecting and mentoring awardees, ensuring additional HSR capacity to improve the quality and delivery of high-value care.

  15. 78 FR 28895 - Susan Harwood Training Grant Program, FY 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Program, FY 2013 AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Notice of... Thursday, June 13, 2013, the application deadline date. ADDRESSES: The complete Susan Harwood Training... Order No. 1-2012 (77 FR 3912). Signed at Washington, DC, on May 13, 2013. David Michaels, Assistant...

  16. 75 FR 30908 - Notice of Funds Availability for FY 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... for the FY 2010 funding round of the Financial Education and Counseling (FEC) Pilot Program... Counseling Services to Prospective Homebuyers. The goals of grants that are awarded through the FEC Pilot Program are to identify successful methods of Financial Education and Counseling Services that result in...

  17. 75 FR 75666 - Advanced Placement (AP) Test Fee Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.330B] Advanced Placement (AP) Test Fee Program AGENCY: Office... AP Test Fee fiscal year (FY) 2011 competition. SUMMARY: On September 1, 2010, we published in the Federal Register (75 FR 53681) a notice inviting applications for the AP Test Fee FY 2011 competition...

  18. Fiscal Year 2007 Program Performance Plan

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…

  19. 76 FR 5244 - Alternative Transportation in Parks and Public Lands Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Fiscal Year (FY) 2010 appropriations and previously unallocated prior year funds, for the Paul S... reserved for oversight activities, and $46,591 will be added to available FY 2011 appropriations for the... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...

  20. The congestion mitigation and air quality improvement (CMAQ) program : a summary of fifth year activities (FY 1996 : October 1995-September 1996)

    DOT National Transportation Integrated Search

    1998-02-01

    This report is the fifth annual national review of activities funded under the : Congestion Mitigation and Air Quality Improvement (CMAQ) Program, covering : fiscal year (FY) 1996. It covers the distribution of funding among project : categories, an ...

  1. 77 FR 24188 - Application Deadline for Fiscal Year (FY) 2012; Small, Rural School Achievement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... DEPARTMENT OF EDUCATION Application Deadline for Fiscal Year (FY) 2012; Small, Rural School... for submission of fiscal year (FY) 2012 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES: Application...

  2. 75 FR 45149 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Housing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ...: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Housing Counseling Grant Program AGENCY... requirements for the FY2010 Housing Counseling Grant NOFA. Approximately $79 million is made available through...), to support the delivery of a wide variety of housing counseling services to homebuyers, homeowners...

  3. 75 FR 61168 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Asthma Interventions in Public and..., funding criteria, and other requirements for the FY2010 Asthma Interventions in Public and Assisted... (CFDA) number for Asthma Interventions in Public and Assisted Multifamily Housing Grant Program is 14...

  4. 76 FR 29258 - Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Interventions in Public and Assisted Multifamily Housing Program AGENCY: Office of Healthy Homes and Lead Hazard... Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted... Availability (NOFA) for the Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted Multifamily...

  5. Report of the Secretary of Defense Frank C. Carlucci to the Congress on the FY 1990/FY 1991 Biennial Budget and FY 1990-94 Defense Programs

    DTIC Science & Technology

    1990-01-01

    effective ways of promoting U.S. interests. Finally, our Denton Amendment space-available transportation program continues assisting generous American hu... Eglin AFB, FL 9th SOS, Eglin AFB, FL 55th SOS, Eglin AFB, FL 1724th Special Tactics Squadron, Pope AFB, NC 67th SOS, RAF Woodbridge, UK 21st SOS...almost all of which were built from 1962 to 1966 - faced block obsolescence within a decade, and their missiles would not be effective against hardened

  6. Descriptive Summaries of the Research Development Test & Evaluation Army Appropriation FY 1982. Supporting Data FY 1982, Budget Estimate Submitted to Congress January 1981 (Amended 30 April 1981). Volume II.

    DTIC Science & Technology

    1981-01-01

    the Position Location Reporting System/Joint Tactical Information Distributlo:; System Hybrid (ADDS) was approved by the Combat and Materiel Developers...Programs program. The establishment of a hybrid testbed will be Initiated in FY 1981 integrating the engint-ciag development models of Position...ad anticipated. 0.110 - This project was Increased by $1999 thousand in FT 1980 to support additional AD work on the hybrid collective protec- tion

  7. Report of the Secretary of Defense Caspar W. Weinberger to the Congress on the FY 1988/FY 1989 Budget and FY 1988-92 Defense Programs, January 12, 1987.

    DTIC Science & Technology

    1987-01-01

    enough to sustain one wartime station overseas as well as satisfy training and maintenance needs. Advanced TacticalAir Reconnaissance System ( ATARS ...The ATARS is an umbrella concept for a series of upgrades in tactical reconnaissance capabilities. Major elements of the program include the Tactical...Funding Funding Funding E-3A Modifkation Development: $ Millions 105.2 96.8 110.7 88.4 Procurement: Quantity - - - - $ Millions .9 33.5 27.7 40.7 ATARS

  8. NASA Microgravity Science and Applications Program

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Key elements of the microgravity research program as conducted by the Microgravity Science and Applications Division (MSAD) within the Office of Space Science and Applications (OSSA) during fiscal year (FY) 1992 are described. This NASA funded program supported investigators from the university, industry, and government research communities. The program's goals, the approach taken to achieve those goals, and the resources that were available are summarized. It provides a 'snapshot' of the Program's status at the end of FY 1992 and reviews highlights and progress in the ground and flight-based research during the year. It also describes four major space missions that flew during FY 1992, the advanced technology development (ATD) activities, and the plans to use the research potential of Space Station Freedom and other advanced carriers. The MSAD program structure encompassed five research areas: (1) Biotechnology, (2) Combustion Science, (3) Fluid Physics, (4) Materials Science, and (5) Benchmark Physics.

  9. The Defense Airborne Reconnaissance Office Unmanned Aerial Vehicle (UAV) Annual Report FY 1996.

    DTIC Science & Technology

    1996-11-06

    i>’ ’" UAV Annual Report FY1996 6 November 1996 L DEFENSE MRBOBNEiSCONNAGSAHCEC UAVANNUAL REPORT OUR SECOND UNMANNED AERIAL VEHICLE (UAV...ANNUAL REPORT provides an overview of the Defense Department’s UAV program activities for fiscal year (FY) 1996 . The Defense Airborne Reconnaissance...significant accomplishments that UAVs have achieved this past year, FY 1996 . Simply stated, UAVs are moving from words to deeds. They are being recognized in

  10. Tactical Aircraft Modernization: Issues for Congress

    DTIC Science & Technology

    2007-06-08

    Investigations into the V-22 program, its crashes, and allegations of malfeasance came to a head in the spring of 2001. On May 1, 2001, a Blue...procurement of all weapons through FY2003 and would rise to 16% through FY2009 and 18% through FY2015. Representative Curt Weldon stated that since...the FY2000 defense budget. In the spring of 2003 F-22 affordability was again at issue. During an April 11 hearing of the House Government Reform

  11. 78 FR 25591 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... details the method for initial ACE sub-allocation to sector members. For FY 2013, each sector has proposed... for the sectors to operate. The NE Multispecies Fishery Management Plan (FMP) allows limited access... accepting additional public comment on the revised explanation of at-sea monitoring (ASM) coverage for FY...

  12. Computer Science Research Funding: How Much Is Too Little?

    DTIC Science & Technology

    2009-06-01

    Bioinformatics Parallel computing Computational biology Principles of programming Computational neuroscience Real-time and embedded systems Scientific...National Security Agency ( NSA ) • Missile Defense Agency (MDA) and others The various research programs have been coordinated through the DDR&E...DOD funding included only DARPA and OSD programs. FY07 and FY08 PBR funding included DARPA, NSA , some of the Services’ basic and applied research

  13. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  14. 3013/9975 Surveillance Program Interim Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunn, K.; Hackney, B.; McClard, J.

    2011-06-22

    The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program [Reference 1] outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) [Reference 2] for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretationmore » of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container [Reference 3]. The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure & Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure & Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013 Standard moisture limit which was opened at LANL. The container pieces and an oxide sample were sent to SRNL for examination in FY11. No significant pressurization has been observed for the Pressure & Corrosion bin containers. Relatively minor corrosion has been observed on some convenience containers and the inside of two inner containers. While the limited extent of corrosion does not jeopardize the integrity of the outer 3013 containers, it does highlight the importance of continuing to perform DE and the Shelf Life program to assure that the corrosion rate is not accelerating or changing to a different corrosion mechanism (e.g., stress corrosion cracking). Statistical sampling is currently scheduled to be completed in FY17, but there is a proposed reduction of the number of DE's per year for FY11 and beyond which may delay the completion date. Since 3013 containers are stored inside 9975 containers, surveillances of 9975 containers are performed in conjunction with 3013 container surveillances. Results of 9975 container nondestructive examinations (NDEs) and DEs indicate that the containers will provide adequate protection of the 3013 containers in K-Area storage for at least 15 years [Reference 4].« less

  15. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less

  16. Proposed U.S. Space Weather Budget for Fiscal Year 2011 Would Fund Key Programs

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-09-01

    The proposed U.S. federal budget for space weather research for fiscal year (FY) 2011 would provide funding for key space weather programs within several U.S. agencies, including NASA, NOAA, the National Science Foundation (NSF), and the Air Force. Funding for the programs comes ahead of the upcoming solar maximum, a period of the solar cycle with heightened solar activity, projected for 2013. Several officials indicated that while funding is not tied to a particular solar maximum or minimum, available assets could help with studying and preparing for the solar maximum. The proposed FY 2011 budget for the Heliophysics Division within NASA's Science Mission Directorate is $641.9 million, compared with the FY 2010 enacted budget of $627.4 million. Within the proposed budget is $166.9 million for heliophysics research, down slightly from $173 million for FY 2010. The proposed budget would include $31.7 million for heliophysics research and analysis (compared with $31 million for FY 2010); $66.7 million for “other missions and data analysis,” including Cluster II, the Advanced Composition Explorer (ACE), and the Time History of Events and Macroscale Interactions during Substorms (THEMIS) mission; and $48.9 million for sounding rockets.

  17. Military Retirement: Background and Recent Developments

    DTIC Science & Technology

    2016-04-06

    facilities and programs. Currently, active component personnel are eligible for retirement or “vested” after completing 20 years of service ( YOS ) and have...Defined Benefit Calculations ............................... 4 “High Three” Eligibility and Defined Benefit Calculations...Retirement Eligibility Flowchart ................... 4 Tables Table 1. DOD Retired Military Personnel, Survivors, and Program Costs, FY2005- FY2014

  18. The NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond and Recent Radiation Highlights

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Sampson, Michael J.

    2015-01-01

    This presentation is a NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond. This roadmap provides a snapshot for current plans and collaborations on testing and evaluation of electronics as well as a discussion of the technology selection approach.

  19. Library of Michigan FY 2000 LSTA Subgrant Program Guidelines.

    ERIC Educational Resources Information Center

    Michigan Library, Lansing.

    This handbook provides FY (fiscal year) 2000 guidelines developed by the Library of Michigan for applying for LSTA (Library Services and Technology Act) subgrant funding. The handbook includes the following sections: (1) overview of the LSTA subgrant program; (2) general application guidelines for all funding areas; (3) required elements of the…

  20. GLOBAL CHANGE RESEARCH NEWS #8: OUR CHANGING PLANET: THE FY2000 U.S. GLOBAL CHANGE RESEARCH PROGRAM

    EPA Science Inventory

    This edition of Global Change Research News focuses on the publication of the new OurChanging Planet: The FY2000 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices ofthe President's National Science and Technology Council. It...

  1. GLOBAL CHANGE RESEARCH NEWS #24: PUBLICATION OF FY2001 EDITION OF "OUR CHANGING PLANET"

    EPA Science Inventory

    The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY2001 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the President's National Science and Technolog...

  2. Institutional research and development, FY 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Struble, G.L.; Lawler, G.M.; Crawford, R.B.

    The Institutional Research and Development program at Lawrence Livermore National Laboratory fosters exploratory work to advance science and technology, disciplinary research to develop innovative solutions to problems in various scientific fields, and long-term interdisciplinary research in support of defense and energy missions. This annual report describes research funded under this program for FY87. (DWL)

  3. 75 FR 56507 - Extension of Award Period for FY 2007 Coastal and Estuarine Land Conservation Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... Assistant Administrator for Management and CFO/CAO, Ocean Services and Coastal Zone Management. [FR Doc...-01] RIN 0648-ZC21 Extension of Award Period for FY 2007 Coastal and Estuarine Land Conservation....gov . SUPPLEMENTARY INFORMATION: The Coastal and Estuarine Land Conservation Program was established...

  4. OPERATIONS AND RESEARCH AT THE U.S. EPA INCINERATION RESEARCH FACILITY: ANNUAL REPORT FOR FY94

    EPA Science Inventory

    Fiscal year 1994 (FY94, October 1, 1993 through September 30,1994) saw the continuation of incineration research testing efforts at the IRF. uring the year, two major pilot-scale programs were completed and a third carried to near-completion, and two bench-scale test programs of ...

  5. LDRD 2017 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, Jack; Flynn, Liz

    This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2017, as required. In FY 2017, the BNL LDRD Program funded 46 projects, 13 of which were new starts, at a total cost of $10.4M.

  6. Air Quality Conformity Determination Of the Constrained Long Range Plan And The FY99-2004 Transportation Improvement Program For The Washington Metropolitan Region

    DOT National Transportation Integrated Search

    1998-07-15

    This report documents the assessment of the Constrained Long Range Plan (CLRP) and the FY99-2004 Transportation Improvement Program (TIP) with respect to air quality conformity requirements under the 1990 Clean Air Act Amendments. The assessment used...

  7. 76 FR 28803 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program and Amendment and Technical Corrections AGENCY: Office of Healthy Homes and Lead Hazard Control, HUD. ACTION: Notice of Availability and...

  8. 75 FR 21232 - FY 2010 NIST Center for Neutron Research (NCNR) Comprehensive Grants Program Extension of Due...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ...-0182-02] FY 2010 NIST Center for Neutron Research (NCNR) Comprehensive Grants Program Extension of Due Date for Proposals AGENCY: National Institute of Standards and Technology (NIST), United States Department of Commerce. ACTION: Notice. SUMMARY: NIST publishes this notice to extend the deadline for...

  9. 78 FR 17188 - Application Deadline for Fiscal Year (FY) 2013; Small, Rural School Achievement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... DEPARTMENT OF EDUCATION [CFDA: Number 84.358A] Application Deadline for Fiscal Year (FY) 2013... establish the deadline for submission of fiscal year (FY) 2013 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES...

  10. Library of Michigan FY 2002 Library Services and Technology Act (LSTA) Grant Administration Handbook.

    ERIC Educational Resources Information Center

    Michigan Library, Lansing.

    This handbook provides FY (fiscal year) 2002 guidelines developed by the Library of Michigan for administering LSTA (Library Services and Technology Act) grants. The first section provides an overview of the LSTA program. The second section gives the grant timeline for FY 2002. The third section describes the award process, including award…

  11. Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress

    DTIC Science & Technology

    2016-01-05

    and is adding 20 berths to all seaframes. The increased berthing supports small increases in the size of the core crew, mission package detachments...for both the FY2009 ships and the FY2010 ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the

  12. 76 FR 2407 - Notice of Availability: HUD's Fiscal Year (FY) 2010 NOFA for the Capital Fund Education and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ...'s Fiscal Year (FY) 2010 NOFA for the Capital Fund Education and Community Facilities Program--Technical Correction and Extension of Deadline Date AGENCY: Office of the Chief Human Capital Officer, HUD... Availability (NOFA) for the Fiscal Year (FY) 2010 Capital Fund Education and Community Facilities (CFCF...

  13. 76 FR 4645 - Fusion Energy Sciences Advisory Committee; Notice of Open Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ..., 9 a.m. to 5 p.m.; Tuesday, March 8, 2011, 8:30 a.m. to 12 p.m. ADDRESSES: Doubletree Bethesda Hotel... year (FY) 2012 budget submission to Congress and to conduct other committee business. Tentative Agenda Items: Office of Science FY 2012 Congressional Budget Request FES Program FY 2012 Congressional Budget...

  14. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-05-31

    building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships

  15. Structural dynamics division research and technology accomplishments for FY 1993 and plans for FY 1994

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1994-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  16. Structural dynamics division research and technology accomplishments for FY 1989 and plans for FY 1990

    NASA Technical Reports Server (NTRS)

    Smith, Jacqueline G.; Gardner, James E.

    1990-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  17. Loads and aeroelasticity division research and technology accomplishments for FY 1985 and plans for FY 1986

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1986-01-01

    The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  18. Loads and Aeroelasticity Division research and technology accomplishments for FY 1986 and plans for FY 1987

    NASA Technical Reports Server (NTRS)

    Gardner, James E.; Dixon, S. C.

    1987-01-01

    The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  19. Non-invasive current and voltage imaging techniques for integrated circuits using scanning probe microscopy. Final report, LDRD Project FY93 and FY94

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, A.N.; Cole, E.I. Jr.; Tangyunyong, Paiboon

    This report describes the first practical, non-invasive technique for detecting and imaging currents internal to operating integrated circuits (ICs). This technique is based on magnetic force microscopy and was developed under Sandia National Laboratories` LDRD (Laboratory Directed Research and Development) program during FY 93 and FY 94. LDRD funds were also used to explore a related technique, charge force microscopy, for voltage probing of ICs. This report describes the technical work performed under this LDRD as well as the outcomes of the project in terms of publications and awards, intellectual property and licensing, synergistic work, potential future work, hiring ofmore » additional permanent staff, and benefits to DOE`s defense programs (DP).« less

  20. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This publication represents the NASA research and technology program for FY92. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  1. Research and technology objectives and plans: Summary fiscal year 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This publication represents the NASA research and technology program for FY 1991. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and in universities. The first section contains citations and abstracts of the RTOP's and is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  2. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This publication represents the NASA research and technology program for FY-93. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  3. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This publication represents the NASA research and technology program for FY88. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  4. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This publication represents the NASA research and technology program for FY89. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  5. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1985-01-01

    This publication represents the NASA research and technology program for FY 1985. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP number.

  6. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This publication represents the NASA research and technology program for FY87. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  7. NASA's university program: Active grants and research contracts, fiscal year 1974

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Each entry includes institution and location, brief description of project, period of performance, principal investigator at institution, NASA technical officer (monitor), sponsoring NASA installation, interagency field of science or engineering classification C.A.S.E. category, grant or contract number, FY 74 obligations, cumulative obligations, and most recent RTOP coding. Entries are arranged alphabetically within state or country. Four cross indices are presented: (1) grant or contract number; (2) C.A.S.E. field or science or engineering; (3) NASA technical officer location; and (4) RTOP code.

  8. Reducing software security risk through an integrated approach

    NASA Technical Reports Server (NTRS)

    Gilliam, D.; Powell, J.; Kelly, J.; Bishop, M.

    2001-01-01

    The fourth quarter delivery, FY'01 for this RTOP is a Property-Based Testing (PBT), 'Tester's Assistant' (TA). The TA tool is to be used to check compiled and pre-compiled code for potential security weaknesses that could be exploited by hackers. The TA Instrumenter, implemented mostly in C++ (with a small part in Java), parsels two types of files: Java and TASPEC. Security properties to be checked are written in TASPEC. The Instrumenter is used in conjunction with the Tester's Assistant Specification (TASpec)execution monitor to verify the security properties of a given program.

  9. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs aremore » discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.« less

  11. Report to the congress on ocean pollution, monitoring and research October 1980 through September 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-07-01

    This report summarizes the results of FY 1981 National Oceanic and Atmospheric Administration (NOAA) monitoring and research efforts under Title II of the Marine Protection, Research, and Sanctuaries Act of 1972 (P.L. 92-532). Section 201 of Title II assigns responsibility to the Department of Commerce for a comprehensive and continuing program of monitoring and research regarding the effects of dumping material into ocean waters, coastal waters, and the Great Lakes. Section 202 of Title II directs the Secretary of Commerce, in consultation with other appropriate parts of the U.S. Government, to 'initiate a comprehensive and continuing program of research withmore » respect to the possible long-range effects of pollution, overfishing, and man-induced changes of ocean ecosystems.' The legislation also directs the Secretary of Commerce to report the findings from the monitoring and research programs to the Congress at least once a year. There are intrinsic difficulties, however, in distinguishing 'long-range' effects from the 'acute' effects of ocean dumping, or more generally of marine pollution. In response to these considerations and to the responsibilities assigned to NOAA under the National Ocean Pollution Planning Act (P.L. 95-273), NOAA has consolidated and coordinated its research efforts in these areas to make the overall program more cost-effective and productive.« less

  12. Medicare Program; FY 2017 Hospice Wage Index and Payment Rate Update and Hospice Quality Reporting Requirements. Final rule.

    PubMed

    2016-08-05

    This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2017. In addition, this rule changes the hospice quality reporting program, including adopting new quality measures. Finally, this final rule includes information regarding the Medicare Care Choices Model (MCCM).

  13. Overview Presentation

    NASA Technical Reports Server (NTRS)

    Lytle, John

    2001-01-01

    This report provides an overview presentation of the 2000 NPSS (Numerical Propulsion System Simulation) Review and Planning Meeting. Topics include: 1) a background of the program; 2) 1999 Industry Feedback; 3) FY00 Status, including resource distribution and major accomplishments; 4) FY01 Major Milestones; and 5) Future direction for the program. Specifically, simulation environment/production software and NPSS CORBA Security Development are discussed.

  14. 42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...

  15. 42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...

  16. 42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...

  17. Report of Secretary of Defense, Caspar W. Weinberger, to the Congress on the FY 1983 Budget, FY 1984 Authorization Request and FY 1983-1987 Defense Programs.

    DTIC Science & Technology

    1982-02-08

    although non-aligned, Malaysia , Indonesia, and Singapore support U.S. presence in South- east Asia and allow unhampered U.S. transit of the vital...modernization of obsolete facilities, maintenance of existing facilities, energy conservation, compliance with environmental and OSHA stan- dards, and NATO

  18. U.S. Army Research Institute 1983 Annual Report

    DTIC Science & Technology

    1983-10-01

    Olllc») v TYPE OF REPORT a PERIOD COVERED Annual; TY 1983 6 PERFORMING ORG. REPORT NUMBER 6. CONTRACT OR GRANT NUMBERf«) 10. PROGRAM ELEMENT...AtTWACT tCmSm mm nrmam «M» W nmommmr —ä Idomlllr br Mock mnkw; An overview of the FY83 research program la presented in terms of these five research...awards, in-house publication«, professional publications and pres- entations, FY83 program management (mission, the core program , the three component

  19. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

  20. NASA's Microgravity Technology Report, 1996: Summary of Activities

    NASA Technical Reports Server (NTRS)

    Kierk, Isabella

    1996-01-01

    This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.

  1. Human genome. 1993 Program report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    The purpose of this report is to update the Human Genome 1991-92 Program Report and provide new information on the DOE genome program to researchers, program managers, other government agencies, and the interested public. This FY 1993 supplement includes abstracts of 60 new or renewed projects and listings of 112 continuing and 28 completed projects. These two reports, taken together, present the most complete published view of the DOE Human Genome Program through FY 1993. Research is progressing rapidly toward 15-year goals of mapping and sequencing the DNA of each of the 24 different human chromosomes.

  2. Review of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program

    DTIC Science & Technology

    2015-05-01

    spell out) originating request, including DoD action officer, email address, and commercial and DSN phone number ; 3. Description...does not display a currently valid OMB control number . 1. REPORT DATE MAY 2015 2. REPORT TYPE 3. DATES COVERED 4. TITLE AND SUBTITLE Review...of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

  3. Overview of Doing Business with SPAWAR Systems Command (SPAWAR)

    DTIC Science & Technology

    2011-08-22

    School Girls Day Out FY07 – 1 school FY08 – 34 schools FY09 – 35 schools FY10 – 47 schools Material World Modules International Autonomous Underwater...s it e , a n d a ls o f rom t h e foll o vn n g link: e-CC Self -Service News The 23rd P.nnual Na v y Gold Coast Small Business O pportunity Conf...Opportunities 1. Requirements Office: Joint Program Manager - Information Systems (JPMIS) 2. Joint Effects Model (JEM) Increment 1 Sustainment 3

  4. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation FY 1982. Supporting Data FY 1982. Supporting Data FY 1982, Budget Estimate Submitted to Congress January 1981, Amended 30 March 1981. Volume III.

    DTIC Science & Technology

    1981-01-01

    ACTIVITIES .......... ............................ 111-548 3/ de ~ &04A.... ~UNCLASSIFIED xiii 0- 4 UNCLASSIFIED FY 1932 ROTE CONGRESSIONAI. DESCRIPTIVE...Title: Comeunicatiois gnlineerin De -elo pmnt DOD Mission Area: i256 - Tactical Communications Sudget Activity: 04 - TactictI Programs Into the...tconditions ot heavy miiltary traffic, high speeds, and severe weather. Army Remote Sensors (REMS) were used to provide 4-cnrity of the Olympic Village complex

  5. Structural dynamics division research and technology accomplishments for FY 1992 and plans for FY 1993

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1993-01-01

    The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  6. Loads and aeroelasticity division research and technology accomplishments for FY 1987 and plans for FY 1988

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Gardner, James E.

    1988-01-01

    The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  7. Research on snow cover monitoring of Northeast China using Fengyun Geostationary Satellite

    NASA Astrophysics Data System (ADS)

    Wu, Tong; Gu, Lingjia; Ren, Ruizhi; Zhou, TIngting

    2017-09-01

    Snow cover information has great significance for monitoring and preventing snowstorms. With the development of satellite technology, geostationary satellites are playing more important roles in snow monitoring. Currently, cloud interference is a serious problem for obtaining accurate snow cover information. Therefore, the cloud pixels located in the MODIS snow products are usually replaced by cloud-free pixels around the day, which ignores snow cover dynamics. FengYun-2(FY-2) is the first generation of geostationary satellite in our country which complements the polar orbit satellite. The snow cover monitoring of Northeast China using FY-2G data in January and February 2016 is introduced in this paper. First of all, geometric and radiometric corrections are carried out for visible and infrared channels. Secondly, snow cover information is extracted according to its characteristics in different channels. Multi-threshold judgment methods for the different land types and similarity separation techniques are combined to discriminate snow and cloud. Furthermore, multi-temporal data is used to eliminate cloud effect. Finally, the experimental results are compared with the MOD10A1 and MYD10A1 (MODIS daily snow cover) product. The MODIS product can provide higher resolution of the snow cover information in cloudless conditions. Multi-temporal FY-2G data can get more accurate snow cover information in cloudy conditions, which is beneficial for monitoring snowstorms and climate changes.

  8. Interior, Environment, and Related Agencies: FY2007 Appropriations

    DTIC Science & Technology

    2007-03-07

    reported bill for FY2007, from the FY2006 level, were the following: ! $-209.5 million (9%) for the National Park Service (NPS); ! $-153.5 million (10%) for...Humphries RSI 7-7264 mhumphries@crs.loc.gov National Park Service David Whiteman RSI 7-7786 dwhiteman@crs.loc.gov Payments in Lieu of Taxes Program (PILT) M...11 National Wildlife Refuge System and Law Enforcement . . . . . . . . . . 12 Avian Flu

  9. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    DTIC Science & Technology

    2008-11-20

    including political, security, social environment, and best ways to engage local populations) in designing new embassies buildings. In the funding...political, economic, and social reforms. The President initially promised $5 billion annually by FY2006, although funds requested and appropriated...other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian, Tibetan

  10. FY 1978 Budget, FY 1979 Authorization Request and FY 1978-1982 Defense Programs,

    DTIC Science & Technology

    1977-01-17

    technological opportunities with defense applica- tions -- such as long-range cruise missiles and guidance, improved sensors, 25 miniaturization, and computer ...Various methods exist for computing the number of theater nuclear weapons needed to perform these missions with an acceptable level of confidence...foreign military forces. Mini-micro computers are especially interesting. -- Finally, since geography remains important, we must recognize that the

  11. FY 2014 Educational Facilities Master Plan and Amendments to the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2013

    2013-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…

  12. Superintendent's Recommended FY 2012 Capital Budget and Amendments to the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…

  13. Superintendent's Recommended FY 2011 Capital Budget and the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2009

    2009-01-01

    In November 1996, the voters of Montgomery County approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County Council would…

  14. Superintendent's Recommended FY 2014 Capital Budget and Amendments to the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…

  15. Superintendent's Recommended FY 2008 Capital Budget & Amendments to the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…

  16. Energy Engineering Analysis Program, limited energy study of steam distribution systems, Hawthorne Army Ammunition Depot, Hawthorne, Nevada. Programming documents

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The project is a significant part of Hawthorne Army Ammunition Depot`s effort to achieve a 20-percent reduction in energy consumption by FY2000 versus FY1985 baseline levels. The project will also assure that heating services are provided to Industrial Area facilities on a continuing basis, supporting mission requirements.

  17. Inspector General, DoD, Oversight of the Army Audit Agency Audit of the U.S. Army Corps of Engineers, Civil Works Program, FY 1996 Financial Statements

    DTIC Science & Technology

    1997-04-10

    The audit objective was to determine the accuracy and completeness of the audit of the U.S. Army Corps of Engineers, Civil Works Program, FY 1996...financial statements conducted by the Army Audit Agency. See Appendix C for a discussion of the audit process.

  18. COSAM program overview

    NASA Technical Reports Server (NTRS)

    Stephens, J. R.

    1982-01-01

    The COSAM program for reduction of the use of strategic alloying elements in nickel-based superalloys for gas turbine engines was reviewed. Sources, consumption, and pricing of cobalt, tantalum, columbium, and chromium are surveyed. Research projects in strategic element substitution, advanced processing concepts, and the development of alternate materials (intermetallics and iron-base alloys) are listed and research plans for FY 1983 and FY 1984 summarized.

  19. Superintendent's Recommended FY 2009 Capital Budget and the FY 2009-2014 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2007

    2007-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…

  20. FY 1986 science budget overview

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.; Robb, David W.

    Continental lithosphere research, scientific ocean drilling, investigative surveys in the Exclusive Economic Zone, and the Mars Observer were among those programs that fared best in the federal budget proposal for fiscal year (FY) 1986 that President Ronald Reagan sent to Congress last week. However, the Sea Grant and Coastal Zone Management programs were among those that fell victim to the budget ax once again.

  1. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT PROGRAM. ANNUAL REPORT TO THE DEPARTMENT OF ENERGY, DECEMBER 1998.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OGEKA,G.J.

    1998-12-31

    In FY 1998, the BNL LDBD Program funded 20 projects, 4 of which were new starts, at a total cost of $2,563,681. The small number of new starts was a consequence of severe financial problems that developed between FY 1997 and 1998. Emphasis was given to complete funding for approved multi-year proposals. Following is a table which lists all of the FY 1998 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which follow. A total of 17more » informal publications (abstracts, presentations, BNL reports and workshop papers) were reported and an additional 13 formal (full length) papers were either published, are in press or being prepared for publication. The investigators on five projects have filed for a patent. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. In conclusion, a significant measure of success is already attributable to the FY 1998 LDBD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less

  2. NREL Energy Storage Projects. FY2014 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pesaran, Ahmad; Ban, Chunmei; Burton, Evan

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Batterymore » Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.« less

  3. Research and development strategic plan : FY2013-FY2017.

    DOT National Transportation Integrated Search

    2013-05-01

    This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...

  4. 50 CFR 86.41 - How long will the money be available?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE... obligation for a total of three fiscal years (e.g. FY 2000 funds will remain available through FY 2002) (16 U...

  5. 78 FR 61202 - Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... Billing for Skilled Nursing Facilities for FY 2014; Correction AGENCY: Centers for Medicare & Medicaid...; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities for FY 2014.'' DATES: These...

  6. Medicare program; revisions to FY 2009 Medicare severity-long-term care diagnosis-related group (MS-LTC-DRG) weights. Interim final rule with comment period.

    PubMed

    2009-06-03

    This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).

  7. Insufficient Governance Over Logistics Modernization Program System Development

    DTIC Science & Technology

    2010-11-02

    Controls Over the Prevalidation of DOD Commercial Payments,” March 2, 2007 Army USAAA Report No. A-2007-0205- FFM , “Logistics Modernization Program...0163- FFM , “FY 03–FY 05 Obligations Recorded in the Logistics Modernization Program,” July 27, 2007 USAAA Report No. A-2007-0154-ALR, “Follow up...Audit of Aged Accounts–U.S. Army Communications-Electronics Life Cycle Management Command,” July 2, 2007 USAAA Report No. A-2006-0234- FFM

  8. U.S. Geological Survey Science for the Wyoming Landscape Conservation Initiative - 2013 Annual Report

    USGS Publications Warehouse

    Bowen, Zachary H.; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Bern, Carleton R.; Biewick, Laura R; Boughton, Gregory K.; Chalfoun, Anna D.; Chong, Geneva W.; Dematatis, Marie K.; Fedy, Bradley C.; Garman, Steven L.; Germaine, Stephen S.; Hethcoat, Matthew G.; Homer, Collin G.; Huber, Christopher; Kauffman, Matthew J.; Latysh, Natalie; Manier, Daniel; Melcher, Cynthia P.; Miller, Kirk A.; Potter, Christopher J.; Schell, Spencer; Sweat, Michael J.; Walters, Annika W.; Wilson, Anna B.

    2014-01-01

    This is the sixth report produced by the U.S. Geological Survey (USGS) for the Wyoming Landscape Conservation Initiative (WLCI) to detail annual activities conducted by USGS for addressing specific management needs identified by WLCI partners. In FY2013, there were 25 ongoing and new projects conducted by the USGS. These projects fall into 8 major categories: (1) synthesizing and analyzing existing data to describe (model and map) current conditions on the landscape; (2) developing models for projecting past and future landscape conditions; (3) monitoring indicators of ecosystem conditions and the effectiveness of on-the-ground habitat projects; (4) conducting research to elucidate the mechanisms underlying wildlife and habitat responses to changing land uses; (5) managing and making accessible the large number of databases, maps, and other products being developed; (6) helping to integrate WLCI outcomes with future habitat enhancement and research projects; (7) coordinating efforts among WLCI partners; and (8) providing support to WLCI decision-makers and assisting with overall evaluation of the WLCI program. The two new projects initiated in FY2013 address (1) important agricultural lands in southwestern Wyoming, and (2) the influence of energy development on native fish communities. The remaining activities entailed our ongoing efforts to compile data, model landscape conditions, monitor trends in habitat conditions, conduct studies of wildlife responses to energy development, and upgrade Web-based products in support of both individual and overall WLCI efforts. Milestone FY2013 accomplishments included completing the development of a WLCI inventory and monitoring framework and the associated monitoring strategies, protocols, and analytics; and initial development of an Interagency Inventory and Monitoring Database, which will be accessible through the Monitoring page of the WLCI Web site at http://www.wlci.gov/monitoring. We also completed the initial phase of the mountain shrub-mapping project in the Big Piney-La Barge mule deer winter range. Finally, a 3-year survey of pygmy rabbits in four major gas-field areas was completed and used to validate the pygmy rabbit habitat model/map developed earlier in the project. Important products that became available for use by WLCI partners included publication of USGS Data Series report (http://pubs.usgs.gov/ds/800/pdf/ds800.pdf) that compiles our WLCI land cover and land use data, which depict current and historical patterns of sage-grouse habitat in relation to energy development and will be used to pose “what-if” scenarios to evaluate possible outcomes of alternative land-use strategies and practices on habitat and wildlife. Another important FY2013 product was a journal article (http://aapgbull.geoscienceworld.org/content/97/6/899.full) that describes the Mowry Shale and Frontier formation, which harbors coalbed methane and shale gas resources in Wyoming, Colorado, and Utah, for use in future scenario-building work. We also produced maps and databases that depict the structure and condition of aspen stands in the Little Mountain Ecosystem, and then presented this information to the Bureau of Land Management, Wyoming Game and Fish Department, and other interested entities for supporting aspen-management objectives.

  9. Photovoltaic Subcontract Program. Annual report, FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  10. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Julianne J.; Nikolich, George; Mizell, Steve

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are beingmore » developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.« less

  11. Laboratory and field studies related to the Hydrologic Resources Management Program. Progress report, October 1, 1992--September 30, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, J.L.; Hawkins, W.L.; Mathews, M.

    This report describes research done at Los Alamos in FY 1993 for the Hydrologic Resources Management Program. The US Department of Energy funds this research through two programs at the Nevada Test Site (NTS): defense and groundwater characterization. Los Alamos personnel have continued to study the high-pressure zone created in the aquifer under Yucca Flat. We analyzed data from a hole in this area (U-7cd) and drilled another hole and installed a water monitoring tube at U-4t. We analyzed water from a number of locations on the NTS where we know there are radionuclides in the groundwater and critiqued themore » effectiveness of this monitoring effort. Our program for analyzing postshot debris continued with material from the last nuclear test in September 1992. We supported both the defense program and the groundwater characterization program by analyzing water samples from their wells and by reviewing documents pertaining to future drilling. We helped develop the analytical methodology to be applied to water samples obtained in the environmental restoration and waste management efforts at the NTS. Los Alamos involvement in the Hydrologic Resources Management Program is reflected in the appended list of documents reviewed, presentations given, papers published, and meetings attended.« less

  12. LDRD 2014 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatton, Diane

    Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2014, as required. In FY 2014, the BNL LDRD Program funded 40 projects, 8 of which were new starts, at a total cost of $9.6M.

  13. LDRD 2012 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bookless, William

    Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2012, as required. In FY2012, the BNL LDRD Program funded 52 projects, 14 of which were new starts, at a total cost of $10,061,292.

  14. LDRD 2015 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatton, D.

    Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2015, as required. In FY 2015, the BNL LDRD Program funded 43 projects, 12 of which were new starts, at a total cost of $9.5M.

  15. Summary of Pellet Technology Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gebhart, III, Gerald E.; Baylor, Larry R.; Bell, Gary L.

    This report summarizes the activities and budget information of ORNL’s pellet technology program from the start of FY2014 through FY2017. Cost summaries are broken down by year and spending category. Milestone activities are outlined and described by year and further described in the project narrative. The project narrative outlines the main pellet injection technology advances enabled by the pellet technology program. A list of published research products is included, along with biographies of personnel involved. This document was prepared in support of the April 24, 2018, review of the pellet technology program at ORNL.

  16. A profile of Hawaiians in the Medicaid Fee-For-Service program.

    PubMed

    Loke, M; Kang-Kaulupali, K T; Honbo, L

    2001-09-01

    In Hawai'i, the Medicaid Fee-For-Service (FFS) program enrolled approximately 39,000 individuals in fiscal year (FY) 1999. This program specifically provides healthcare services to enrollees classified as aged, blind, disabled, in-state foster children, and children who live out-of-state in subsidized adoptions. The total expenditure associated with this program was over $300 million in FY 1999. Nearly 4,600 enrollees in the Medicaid FFS program were self-identified as Native Hawaiians or part-Hawaiians. Although the proportion of Hawaiians in the Medicaid program was a fair representation of Hawaiians in the state, the distribution by recipient category within the program was in sharp contrast. Aged Hawaiians appeared to be under-represented in the program while disabled Hawaiians were overrepresented. Foster children and children under subsidized adoption accounted for 1% of the total Hawaiian population. Excluding the foster children and children under subsidized adoption, recipients of Hawaiian ancestry in the Medicaid FFS program (aged, blind, and disabled) obtained health care services amounting to approximately $34 million in FY 1999. Females in this population received more services, with total Medicaid payments amounting to $18.7 million. A higher proportion of Hawaiian recipients were on the neighbor islands. In this FFS Hawaiian population, the top three disease-states by dollar volume in FY 1999, were Alzheimer's disease, acute cerebrovascular disease, and profound mental retardation. A total of $3 million in services were provided to recipients with these primary disease-states. The five leading disease-states facing Hawaiians were generally comparable to those confronting the overall FFS population.

  17. Defense: FY2013 Authorization and Appropriations

    DTIC Science & Technology

    2012-09-05

    dollars and overturn several cost- cutting initiatives incorporated in the Administration’s budget, including proposed reductions in the Air Force...deficit reduction through FY2021 of $2.1 trillion). In FY2013, the BCA requires an across the board cut in budget authority (or “sequester”) that would...some $59 billion—about 10 percent—would be cut from the Administration’s budget request, with equal percentages cut from each program, project

  18. Laboratory Directed Research and Development FY-15 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pillai, Rekha Sukamar

    The Laboratory Directed Research and Development (LDRD) Program at Idaho National Laboratory (INL) reports its status to the U.S. Department of Energy (DOE) by March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. LDRD funds are obtained through a charge to all INL programs. This report includes summaries of all INL LDRD research activities supported during Fiscal Year (FY) 2015.

  19. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements andmore » challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of approximately 45 percent since 2010. If adopted by Congress, the FY 2017 budget request will increase funding by $396 million (about 4.5 percent) from the enacted FY 2016 level. A significant portion of the increase would fund the research for multiple life extension programs, support the programs in Directed Stockpile Work, and modernize the physical infrastructure of the nuclear security enterprise.« less

  20. US Navy FY 1997 Research Program

    DTIC Science & Technology

    1997-09-30

    US NAVY FY 1997 RESEARCH PROGRAM Henry E. Bass National Center for Physical Acoustics University of Mississippi University, MS 38677 Phone: (601...232-5905 Fax: (601) 232-7494 Email: pabass@olemiss.edu Award Number: N00014-95-1-1306 LONG-TERM GOALS The National Center for Physical Acoustics ...NCPA) provides an integrated physical acoustics laboratory to facilitate research in sound propagation and attenuation, molecular and chemical physics

  1. Accelerated Progress Through Self-Determination. Second Annual Report of the Choctaw Self-Determination Project, July 1, 1972 - October 31, 1973.

    ERIC Educational Resources Information Center

    Mississippi Band of Choctaw Indians, Philadelphia.

    Self-determination for the Choctaw tribal government and its people was reflected in the progress made in program development. Programs in effect during fiscal year (FY) 1973 covered the full range of economic and social needs of the Choctaw people. Designed to complement the progress achieved during FY 1972, the following four developmental…

  2. University of San Francisco Institutional-Level Financial Indicators, FY 1968-1969 to FY 1972-1973.

    ERIC Educational Resources Information Center

    Counelis, James S.; Rizzo, Claude J.

    To manage effectively the higher education enterprise is a complex matter. Part of the problem of managing complexity is the need for monitoring data in time series such that the on-going enterprise is viewed at comparable times in comparable terms. Part of the answer at the University of San Francisco is the development of time series data on…

  3. Enriching Arizona's Knowledge Economy: Creating the Research Connections, Attention, and Talent Arizona Needs to Compete. Proposition 301 Investments at Arizona State University, FY 2002-FY 2005

    ERIC Educational Resources Information Center

    Heffernon, Rick

    2006-01-01

    This report presents results tracked by the CAT Measures, a 21st century assessment tool for enabling policymakers to monitor "en route" performance of their public investments in science and technology research. Developed by Morrison Institute for Public Policy at Arizona State University, the CAT Measures analyze growth supporting…

  4. Electric Propulsion Test & Evaluation Methodologies for Plasma in the Environments of Space and Testing (EP TEMPEST) (Briefing Charts)

    DTIC Science & Technology

    2015-04-01

    in the Environments of Space and Testing (EP TEMPEST ) - Program Review (Briefing Charts) 5a. CONTRACT NUMBER In-House 5b. GRANT NUMBER 5c...of Space and Testing (EP TEMPEST ) AFOSR T&E Program Review 13-17 April 2015 Dr. Daniel L. Brown In-Space Propulsion Branch (RQRS) Aerospace Systems...Statement A: Approved for public release; distribution is unlimited. EP TEMPEST (Lab Task, FY14-FY16) Program Goals and Objectives Title: Electric

  5. FY98 Class Convening Schedule for Coast Guard Class

    DOT National Transportation Integrated Search

    1998-08-12

    This Notice publishes the FY98 class convening schedule of Coast Guard Class "A" : and "C" resident and exportable training courses defined by program/force : managers as essential or directly related to mission accomplishment for : achievement of pr...

  6. Laboratory Directed Research and Development FY 2000 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Ayat, R

    This Annual Report provides an overview of the FY2000 Laboratory Directed Research and Development (LDRD) Program at Lawrence Livermore National Laboratory (LLNL) and presents a summary of the results achieved by each project during the year.

  7. Idaho National Laboratory Cultural Resource Monitoring Report for FY 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    INL Cultural Resource Management Office

    2010-10-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2010 (FY 2010). Throughout the year, thirty-three cultural resource localities were revisited, including somethat were visited more than once, including: two locations with Native American human remains, one of which is a cave, two additional caves, twenty-six prehistoric archaeological sites, two historic stage stations, and Experimental Breeder Reactor-I, which is a designated National Historic Landmark. The resources that were monitored included seventeen that are routinely visited and sixteen that are located in INL project areas. Although impacts weremore » documented at a few locations and one trespassing incident (albeit sans formal charges) was discovered, no significant adverse effects that would threaten the National Register eligibility of any resources were observed. Monitoring also demonstrated that several INL projects generally remain in compliance with recommendations to protect cultural resources.« less

  8. 2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, Gregory

    2014-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less

  9. Designing an effective statewide tobacco control program--Massachusetts.

    PubMed

    Connolly, G; Robbins, H

    1998-12-15

    Smoking-related illnesses kill > 10,000 Massachusetts residents each year and cost hundreds of millions of dollars of public and private expenditures for health care. To combat this public health problem, in 1992 Massachusetts voters approved a referendum question calling for an increased excise tax on tobacco products, with the revenue supporting a Health Protection Fund. Approximately 40% of the fund is used to finance the Massachusetts Tobacco Control Program (MTCP), administered by the Massachusetts Department of Public Health. During the first 3 fiscal years (FY), the MTCP budget has averaged just over $40 million annually, declining during that period from approximately $43 million in FY 1995 to < $37 million in FY 1997.

  10. Report of Secretary of Defense, Harold Brown, to the Congress on the FY 1982 Budget, FY 1983 Authorization Request and FY 1982-1986 Defense Programs

    DTIC Science & Technology

    1981-01-19

    a " high -low" mix of high performance ...meet the common threat. 86 Considerable progress is being made. Last year, Japanese ships and aircraft performed very capably in a joint naval exercise... high school graduates, however, does not mean that a high school diploma is necessarily a predictor of on-the-job performance in the military.

  11. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    DTIC Science & Technology

    2007-12-14

    and social reforms. The President initially pledged $5 billion annually by FY2006, although funds requested and appropriated have never reached this...to Cuba. The BBG is planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also...increased to $230.0 million. The increase of $195 million is entirely for social services to Iraqi refugees. FY2007 Supplemental Request. On April 25

  12. Intelligence Spending and Appropriations: Issues for Congress

    DTIC Science & Technology

    2013-09-05

    while the MIP grew at a slower pace. The NIP budget in 2001 (then referred to as the National Foreign Intelligence Program— NFIP ) was roughly $24 billion...House Appropriations Committee (HAC) disclosure, adjusted for inflation. The Committee indicated that the Administration’s FY1995 NFIP request was...to shows funding for the National Foreign Intelligence Program. The FY1995 figure is therefore a useful proxy for the NFIP budget in FY2001. 13 DNI

  13. Revised congressional budget request, FY 1982. Conservation and renewable energy program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-03-01

    Programs dealing with conservation and renewable energy are reprinted from the Revised Congressional Budget Request FY 1982. From Volume 7, Energy Conservation, information is presented on: buildings and community systems; industrial programs; transportation programs; state and local programs; inventor's program energy conversion technology; energy impact assistance; and residential/commercial retrofit. From Volume 2, Energy Supply Research and Development, information and data are presented on: solar building applications; solar industrial applications; solar power applications; solar information systems; SERI facility; solar international activities; alcohol fuels; geothermal; and hydropower. From Volume 6, Energy Production, Demonstration, and Distribution, information and data on solar energy production,more » demonstration, and distribution are presented. From Volume 3, Energy Supply and R and D Appropriation, information and data on electric energy systems and energy storage systems are included. From Volume 4, information and data are included on geothermal resources development fund. In Volume 5, Power Marketing Administrations, information and data are presented on estimates by appropriations, positions and staff years by appropriation, staffing distribution, and power marketing administrations. Recissions and deferrals for FY 1981 are given. (MCW)« less

  14. Enabling propulsion materials for high-speed civil transport engines

    NASA Technical Reports Server (NTRS)

    Stephens, Joseph R.; Herbell, Thomas P.

    1992-01-01

    NASA Headquarters and LeRC have advocated an Enabling Propulsion Materials Program (EPM) to begin in FY-92. The High Speed Research Phase 1 program which began in FY-90 has focused on the environmental acceptability of a High Speed Civil Transport (HSCT). Studies by industry, including Boeing, McDonnell Douglas, GE Aircraft Engines, and Pratt & Whitney Aircraft, and in-house studies by NASA concluded that NO(x) emissions and airport noise reduction can only be economically achieved by revolutionary advancements in materials technologies. This is especially true of materials for the propulsion system where the combustor is the key to maintaining low emissions, and the exhaust nozzle is the key to reducing airport noise to an acceptable level. Both of these components will rely on high temperature composite materials that can withstand the conditions imposed by commercial aircraft operations. The proposed EPM program will operate in conjunction with the HSR Phase 1 Program and the planned HSR Phase 2 program slated to start in FY-93. Components and subcomponents developed from advanced materials will be evaluated in the HSR Phase 2 Program.

  15. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  16. Annual Plan for the EPA and CSB - FY 2018

    EPA Pesticide Factsheets

    Nov 9, 2017. FY 2018 plan reflects the priority work that the OIG believes is necessary to keep the EPA Administrator, the CSB, and Congress fully informed about problems and deficiencies relating to the administration of agency programs and operations.

  17. 77 FR 26751 - Integrated Risk Information System (IRIS); Announcement of 2012 Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ...-41-4. ethylene oxide (cancer) 75-21-8. formaldehyde \\1\\ 50-00-0. hexabromocyclododecane (mixed 3194...\\. octamethylcyclotetrasiloxane 556-67-2 FY13. (D4) \\2\\. 1,2-dichloroethane (ethylene 107-06-2 FY14. dichloride) \\1,3...

  18. TRAC-Monterey FY16 Work Program Development and Report of Research Elicitation

    DTIC Science & Technology

    2016-01-01

    any changes to priorities or additional projects that require immediate research. Work Program; Research Elicitation Unclassified UU UU UU UU 35 MAJ...conduct analysis for the Army. 1 Marks, Chris, Nesbitt, Peter. TRAC FY14 Research Requirements Elicitation . Technical Report TRAC-M-TM-13-059. 700 Dyer... Requirements Elicitation Interviews Interview Guide: 1. Describe a research requirement in the areas of topics, techniques, and methodologies. 2

  19. Department of the Navy Amended FY 1992/FY 1993 Biennial Budget Estimates. R,D,T, and E Descriptive Summaries Submitted to Congress January 1992. Research, Development, Test and Evaluation, Navy

    DTIC Science & Technology

    1992-01-01

    counications between technology producer (Navy RDT&X community) and technology customer (Navy/MarLne Corps operating forces). Program technological...Additional programs as rwured by Fleet customer . 3. (U) 1t 1993 Planes Identify issues and provide link to RDT&3 community. Projects will vary according to...fleet customer requLrements. 4. (U) Program to Cmpletions This is a continuing program. D. (U) WORK pIRFORIpD l: iN-DOSE: NsWC Dahlgren, VA; AC

  20. 77 FR 20437 - Susan Harwood Training Grant Program, FY 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... availability of funds and solicitation for Grant Applications (SGA) for Targeted Topic Training, and Targeted Topic Training and Educational Materials Development Grants. Funding Opportunity No.: SHTG-FY-12-01...

  1. FY 2016 and FY 2017 Request for Proposals for the Source Reduction Assistance Grant Program

    EPA Pesticide Factsheets

    EPA is announcing the availability of SRA grants and/or cooperative agreements to fund projects supporting p2/source reduction and resource conservation; it is anticipated up to $2,200,000 will be available collectively.

  2. Department of the Navy. FY 1994/FY 1995 Biennial Budget Estimates. Military Construction Program. FY 1994

    DTIC Science & Technology

    1992-01-01

    3 are severely deteriorated. The concrete deck and supporting wood -pile structure are nearing the end of their life cycle. Both piers are to be...PROPOSED CONSTRUCTION One-story building with concrete foundation walls, load bearing masonry walls, and concrete floors; roof with wood truss framing...concrete building addition; concrete foundation and slab on grade; wood truss roof; 750 KVA. 3 phase transformer; utilities; concrete and storm drain. 11

  3. The Marshall Space Flight Center KC-135 zero gravity test program for FY 1982

    NASA Technical Reports Server (NTRS)

    Shurney, R. E. (Editor)

    1983-01-01

    During FY-82, researchers and experimenters from Marshall Space Flight Center (MSFC) conducted 11 separate investigations during 26.3 hr of testing aboard the KC-135 zero-gravity aircraft, based at Ellington Air force Base, Texas. Although this represented fewer hours than initially projected, all experiment and test objectives were met or exceeded. This Technical Memorandum compiles all results achieved by MSFC users during FY-82, a year considered to be highly productive.

  4. FY 2000/FY 2001 Budget Estimates, Air National Guard, FY 2000 Military Construction Program, Justification Data Submitted to Congress.

    DTIC Science & Technology

    1999-02-01

    299 28 271 0 194 16 178 0 TOTAL OFFICER ENLISTED 948 120 828 954 89 865 12. RESERVE UNIT DATA UNIT DESIGNATION 156 Aircraft Generation...with oil/water separator, fire suppression (overhead wet pipe and underwing AFFF ), personnel breathing apparatus, fall protection system, and all...underwing AFFF ), and floor refmishing/restriping. The hangar shops and offices require relocation/renovation. Various utility systems need to be

  5. 2016 Los Alamos National Laboratory Hazardous Waste Minimization Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salzman, Sonja L.; English, Charles Joe

    Waste minimization and pollution prevention are goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE), inclusive of the National Nuclear Security Administration (NNSA) and the Office of Environmental Management, and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program, whichmore » is a component of the overall Pollution Prevention (P2) Program, administered by the Environmental Stewardship Group (EPC-ES). This report also supports the waste minimization and P2 goals of the Associate Directorate of Environmental Management (ADEM) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. This report includes data for all waste shipped offsite from LANL during fiscal year (FY) 2016 (October 1, 2015 – September 30, 2016). LANS was active during FY2016 in waste minimization and P2 efforts. Multiple projects were funded that specifically related to reduction of hazardous waste. In FY2016, there was no hazardous, mixed-transuranic (MTRU), or mixed low-level (MLLW) remediation waste shipped offsite from the Laboratory. More non-remediation hazardous waste and MLLW was shipped offsite from the Laboratory in FY2016 compared to FY2015. Non-remediation MTRU waste was not shipped offsite during FY2016. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.« less

  6. Customer Satisfaction Survey of Pacific Northwest National Laboratory's Technical Assistance Partners -- FY 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conger, Robin L.; Spanner, Gary E.

    2011-11-02

    The businesses that have utilized PNNL's Technology Assistance Program were sent a survey to solicit feedback about the program and to determine what, if any, outcomes resulted from the assistance provided. As part of its small business outreach, Pacific Northwest National Laboratory (PNNL) offers technology assistance to businesses with fewer than 500 employees throughout the nation and to businesses of any size in the 2 counties that contain the Hanford site. Upon request, up to 40 staff-hours of a researcher's time can be provided to address technology issues at no charge to the requesting firm. During FY 2011, PNNL completedmore » assistance for 54 firms. Topics of the technology assistance covered a broad range, including environment, energy, industrial processes, medical, materials, computers and software, and sensors. In FY 2011, PNNL's Technology Assistance Program (TAP) was funded by PNNL Overheads. Over the past 16 years, the Technology Assistance Program has received total funding of nearly $2.8 million from several federal and private sources.« less

  7. Notification: CTS Asheville Superfund Site Update: Sampling, Monitoring, Communication and Opportunities for Cleanup Efficiencies

    EPA Pesticide Factsheets

    Project #OPE-FY14-0044, July 22, 2014. The EPA OIG plans to begin preliminary research of the EPA's sampling, monitoring, communication and opportunities for cleanup efficiencies for the CTS Asheville Superfund Site, North Carolina.

  8. FY 1991 safety program status report

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In FY 1991, the NASA Safety Division continued efforts to enhance the quality and productivity of its safety oversight function. Recent initiatives set forth in areas such as training, risk management, safety assurance, operational safety, and safety information systems have matured into viable programs contributing to the safety and success of activities throughout the Agency. Efforts continued to develop a centralized intra-agency safety training program with establishment of the NASA Safety Training Center at the Johnson Space Center (JSC). The objective is to provide quality training for NASA employees and contractors on a broad range of safety-related topics. Courses developed by the Training Center will be presented at various NASA locations to minimize travel and reach the greatest number of people at the least cost. In FY 1991, as part of the ongoing efforts to enhance the total quality of NASA's safety work force, the Safety Training Center initiated development of a Certified Safety Professional review course. This course provides a comprehensive review of the skills and knowledge that well-rounded safety professionals must possess to qualify for professional certification. FY 1992 will see the course presented to NASA and contractor employees at all installations via the NASA Video Teleconference System.

  9. AV-8B Remanufacture Program as Part of the Audit of the Defense Acquisition Board Review Process - FY 1994

    DTIC Science & Technology

    1994-06-03

    wft*:¥A:ft:i:ft& OFFICE OF THE INSPECTOR GENERAL AV-8B REMANUFACTURE PROGRAM AS PART OF THE AUDIT OF THE DEFENSE ACQUISITION BOARD...Part of the Audit of the Defense Acquisition Board Review Process - FY 1994 B. DATE Report Downloaded From the Internet: 03/23/99 C. Report’s Point...NAVY FOR RESEARCH DEVELOPMENT AND ACQUISITION SUBJECT: Audit Report on the AV-8B Remanufacture Program as Part of the Audit of the Defense

  10. Electric and Hybrid Vehicles Program. Sixteenth annual report to Congress for fiscal year 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    This report describes the progress achieved in developing electric and hybrid vehicle technologies, beginning with highlights of recent accomplishments in FY 1992. Detailed descriptions are provided of program activities during FY 1992 in the areas of battery, fuel cell, and propulsion system development, and testing and evaluation of new technology in fleet site operations and in laboratories. This Annual Report also contains a status report on incentives and use of foreign components, as well as a list of publications resulting from the DOE program.

  11. Physics of the Cosmos Program Annual Technology Report

    NASA Technical Reports Server (NTRS)

    Pham, Bruce Thai; Cardiff, Ann H.

    2015-01-01

    What's in this Report? What's New? This fifth Program Annual Technology Report (PATR) summarizes the Programs technology development activities for fiscal year (FY) 2015. The PATR serves four purposes.1. Summarize the technology gaps identified by the astrophysics community;2. Present the results of this years technology gap prioritization by the PCOS Technology Management Board (TMB);3. Report on newly funded PCOS Strategic Astrophysics Technology (SAT) projects; and4. Detail progress, current status, and activities planned for the coming year for all technologies supported by PCOS Supporting Research and Technology (SRT) funding in FY 2015. .

  12. 2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, G.

    2013-03-18

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less

  13. The Merida Initiative: Refuting the Need for a Military Hammer

    DTIC Science & Technology

    2012-03-08

    resulted in a package of U.S. assistance for Mexico and Central America beginning in FY 2008 and lasting through FY 2010. Dubbed the Merida Initiative...at- risk youth program (non-Merida) administered by international organizations working in the city [Ciudad Jaurez].”59 These two initiatives in...officers in the Department of Defense IMET funded programs of any Latin American country.”69 Department of Defense provides other opportunities in

  14. Ethanol annual report FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Texeira, R.H.; Goodman, B.J.

    This report summarizes the research progress and accomplishments of the US Department of Energy (DOE) Ethanol from Biomass Program, field managed by the Solar Energy Research Institute, during FY 1990. The report includes an overview of the entire program and summaries of individual research projects. These projects are grouped into the following subject areas: technoeconomic analysis; pretreatment; cellulose conversion; xylose fermentation; and lignin conversion. Individual papers have been indexed separately for inclusion on the data base.

  15. FY14 LLNL OMEGA Experimental Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heeter, R. F.; Fournier, K. B.; Baker, K.

    In FY14, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 324 target shots in FY14, with 246 shots using just the OMEGA laser system, 62 shots using just the EP laser system, and 16 Joint shots using Omega and EP together. Approximately 31% of the total number of shots (62 OMEGA shots, 42 EP shots) shots supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID).more » The remaining 69% (200 OMEGA shots and 36 EP shots, including the 16 Joint shots) were dedicated to experiments for High- Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.« less

  16. FY15 LLNL OMEGA Experimental Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heeter, R. F.; Baker, K. L.; Barrios, M. A.

    In FY15, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 468 target shots in FY15, with 315 shots using just the OMEGA laser system, 145 shots using just the EP laser system, and 8 Joint shots using Omega and EP together. Approximately 25% of the total number of shots (56 OMEGA shots and 67 EP shots, including the 8 Joint shots) supported the Indirect Drivemore » Inertial Confinement Fusion Campaign (ICF-ID). The remaining 75% (267 OMEGA shots and 86 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.« less

  17. Developing the science product algorithm testbed for Chinese next-generation geostationary meteorological satellites: Fengyun-4 series

    NASA Astrophysics Data System (ADS)

    Min, Min; Wu, Chunqiang; Li, Chuan; Liu, Hui; Xu, Na; Wu, Xiao; Chen, Lin; Wang, Fu; Sun, Fenglin; Qin, Danyu; Wang, Xi; Li, Bo; Zheng, Zhaojun; Cao, Guangzhen; Dong, Lixin

    2017-08-01

    Fengyun-4A (FY-4A), the first of the Chinese next-generation geostationary meteorological satellites, launched in 2016, offers several advances over the FY-2: more spectral bands, faster imaging, and infrared hyperspectral measurements. To support the major objective of developing the prototypes of FY-4 science algorithms, two science product algorithm testbeds for imagers and sounders have been developed by the scientists in the FY-4 Algorithm Working Group (AWG). Both testbeds, written in FORTRAN and C programming languages for Linux or UNIX systems, have been tested successfully by using Intel/g compilers. Some important FY-4 science products, including cloud mask, cloud properties, and temperature profiles, have been retrieved successfully through using a proxy imager, Himawari-8/Advanced Himawari Imager (AHI), and sounder data, obtained from the Atmospheric InfraRed Sounder, thus demonstrating their robustness. In addition, in early 2016, the FY-4 AWG was developed based on the imager testbed—a near real-time processing system for Himawari-8/AHI data for use by Chinese weather forecasters. Consequently, robust and flexible science product algorithm testbeds have provided essential and productive tools for popularizing FY-4 data and developing substantial improvements in FY-4 products.

  18. Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riley, Brian J.; Mccloy, John S.; Crum, Jarrod V.

    2014-01-17

    The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for themore » Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.« less

  19. Evaluation of FY 1987 safety belt use law state enforcement grants

    DOT National Transportation Integrated Search

    1991-03-01

    The report presents information and an evaluation of safety belt use law enforcement grants provided to 17 states through supplemental 403 grants during FY 1987. Elmira-type programs were to serve as a model in order to demonstrate that basic enforce...

  20. 78 FR 68825 - Strategic Environmental Research and Development Program, Scientific Advisory Board; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... (RC-2434)--FY14 Re-Brief, Dr. Jeffrey Foster, Northern Seed Dispersal Networks and Novel Arizona.... Sediments, and Biological Receptors. 1:25 p.m 14 ER03-025 (ER-2428)--FY14 New Start, Dr. Danny Reible, Texas...

  1. FY 2018 and FY 2019 Pollution Prevention Grant Program Request for Proposals

    EPA Pesticide Factsheets

    To assist state and tribal governments to encourage businesses to adopt environmental strategies and solutions that significantly reduce or eliminate waste from the source, EPA anticipates it will award approximately $4.69 million for the P2 Grant in 2018.

  2. Transportation Research and Analysis Computing Center (TRACC) Year 6 Quarter 4 Progress Report

    DOT National Transportation Integrated Search

    2013-03-01

    Argonne National Laboratory initiated a FY2006-FY2009 multi-year program with the US Department of Transportation (USDOT) on October 1, 2006, to establish the Transportation Research and Analysis Computing Center (TRACC). As part of the TRACC project...

  3. FY 2016 and FY 2017 Pollution Prevention Grant Program Request for Proposals

    EPA Pesticide Factsheets

    To assist state and tribal governments to encourage businesses to adopt environmental strategies and solutions that significantly reduce or eliminate waste from the source, EPA anticipates it will award approximately $3.97 million for the P2 Grant in 2016.

  4. Human Nutrition Research Conducted at State Agricultural Experiment Stations and 1890/Tuskegee Agricultural Research Programs.

    ERIC Educational Resources Information Center

    Driskell, Judy A.; Myers, John R.

    1989-01-01

    Cooperative State Research Service-administered and state-appropriated State Agriculture Experiment Station funds for human nutrition research increased about two-fold from FY70-FY86, while the percentage of budget expended for this research decreased. (JOW)

  5. The investigation of identifying method on grass fire by FY-3 VIRR images

    NASA Astrophysics Data System (ADS)

    Jiang, Youyan; Han, Tao; Wang, Dawei

    2018-03-01

    Grassland fire has the characteristics of fierce fire and rapid spreading, and many fires occur in sparsely populated places. Satellite remote sensing has the characteristics of fast imaging period and wide coverage, and plays an important role in the rapid monitoring and evaluation of grassland fire. FY-3 satellite has been widely used since its launch in September 2008, and this paper uses the fire information of Gansu grassland from 2011 to 2016, based on the more mature MODIS and NOAA-AVHRR fire identification method. The results show that the accuracy of FY-3/VIRR satellite data fire detection are higher than that of NOAA-AVHRR satellite, and the accuracy of FY-3/VIRR satellite data is described. There is a greater improvement, the ability to identify slightly worse than the MODIS satellite, the region is relatively large fire detection accuracy is higher.

  6. Rocky Mountain Arsenal, North Boundary Containment/Treatment System, Operational Assessment Report FY85/FY86. Volume 3. Data Listings

    DTIC Science & Technology

    1987-06-01

    Treatment System Water Quality Data I PART III: Monitoring Well Water Level Data I PART IV: Monitoring Well Water Quality Data I PART V: Dewatering...J. =r "c’ u, %-CUmC , ILn- cc 0 Q O-a CV...i c *- WcL MCQ . . C.. ....... o , a - 0 ro, WO- -- a sf’- -;MO IWM ý gMMU- r- %0 C-.o rW0" . A =a, 0 I...of water level data are given below: I WELL NO (WELL NUMBER) is made up of the sectf -n number (01-36) and the well sequence number (001-999) within

  7. The US DOE-EM International Program - 13004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmetti, Rosa R.; Han, Ana M.; Williams, Alice C.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)« less

  8. The US DOE EM international program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmetti, Rosa R.; Han, Ana M.; Roach, Jay A.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into the remainder of FY 2013 and beyond. (authors)« less

  9. Congress examines administration's coal research priorities

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2011-10-01

    While the Obama administration has proposed a shift in coal research funding to further emphasize carbon capture and sequestration (CCS) programs in its fiscal year (FY) 2012 budget request, Republicans and several witnesses at a 13 October hearing of a subcommittee of the House of Representatives' Committee on Science, Space, and Technology questioned those priorities, called for additional federal funding for coal research, and defended the use of coal as a major part of the U.S. energy sector. The administration's FY 2012 budget requests 291.4 million to fund the Department of Energy's (DOE) CCS and power systems program while zeroing out funding for DOE's fuels and power systems program (which includes funding for coal research) and shifting some of its line items to the CCS program. The FY 2011 continuing resolution has funded the fuels and power systems program at 400.2 million, including 142 million for carbon sequestration, 64.8 million for innovations for existing plants, and funding for other subprograms such as advanced integrated gasification combined cycle (52.9 million), fuel cells (49.8 million), and advanced research ($47.6 million).

  10. Integrated modeling of advanced optical systems

    NASA Astrophysics Data System (ADS)

    Briggs, Hugh C.; Needels, Laura; Levine, B. Martin

    1993-02-01

    This poster session paper describes an integrated modeling and analysis capability being developed at JPL under funding provided by the JPL Director's Discretionary Fund and the JPL Control/Structure Interaction Program (CSI). The posters briefly summarize the program capabilities and illustrate them with an example problem. The computer programs developed under this effort will provide an unprecedented capability for integrated modeling and design of high performance optical spacecraft. The engineering disciplines supported include structural dynamics, controls, optics and thermodynamics. Such tools are needed in order to evaluate the end-to-end system performance of spacecraft such as OSI, POINTS, and SMMM. This paper illustrates the proof-of-concept tools that have been developed to establish the technology requirements and demonstrate the new features of integrated modeling and design. The current program also includes implementation of a prototype tool based upon the CAESY environment being developed under the NASA Guidance and Control Research and Technology Computational Controls Program. This prototype will be available late in FY-92. The development plan proposes a major software production effort to fabricate, deliver, support and maintain a national-class tool from FY-93 through FY-95.

  11. Summary of the NASA/MSFC FY-79 Severe Storm and Local Weather research review. [cloud physics, atmospheric electricity, and mesoscale/storm dynamics reserach

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Significant acomplishments, current focus of work, plans for FY-80, and recommendations for new research are outlined for 36 research projects proposed for technical monitoring by the Atmospheric Sciences Division at Marshall Space Flight Center. Topics of the investigations, which were reviewed at a two-day meeting, relate to cloud physics, atmospheric electricity, and mesoscale/storm dynamics.

  12. Biological and Chemical Technologies Research at OIT: Annual Summary Report, FY 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, G.

    1998-03-01

    The annual summary report presents the fiscal year (FY) 1 997 research activities and accomplishments for the United States Department of Energy (DOE) Biological and Chemical Technologies Research (BCTR) Program. This BCTR program resides within the Office of Industrial Technologies (OIT) of the Office of Energy Efficiency and Renewable Energy (EE). The annual summary report for 1997 (ASR 97) contains the following: program description (including BCTR program mission statement, historical background, relevance, goals and objectives); program structure and organization; selected technical and programmatic highlights for 1 997; detailed descriptions of individual projects; and a listing of program output, including amore » bibliography of published work, patents, and awards arising from work supported by the program.« less

  13. Workload Trend Analysis for the Military Graduate Medical Education Program in San Antonio

    DTIC Science & Technology

    2005-05-25

    Procedures 57 Introduction and Methodology 57 Results and Discussion 58 Craniotomy 61 Introduction and Methodology 61 Results and Discussion 62...distribution of major vascular procedures by age group for FY 00-04 36. WHMC and BAMC craniotomies for FY 00-04 by age group 37. WHMC and BAMC FY 00-04...average craniotomies by age group compared to required average based on RRC requirement 38. WHMC and BAMC distribution of craniotomies by age group for

  14. Coalition Warfare Program Presentation to: 2009 EUCOM/AFRICOM Science and Technology Conference

    DTIC Science & Technology

    2009-06-01

    compac an nexpens ve m cro- fluxgate magnetometer for use in multiple COCOMs. To continue T&E with joint services and apply lessons learned to...Partners in EUCOM/AFRICOM FY08 Starts • Advanced Dynamic Magnetometer FY09 Starts • ADNS Coalition Network FY10 New Starts • Clip-on Night Vision...Partner 2008 New Starts Advanced Dynamic Magnetometer for Static and Moving Applications T d l t d i i i US Navy (SPAWAR) Italy, Sweden o eve op a a

  15. U.S. Marine Corps FY 82 Exploratory Development Program.

    DTIC Science & Technology

    1982-01-25

    1. It is requested that the cover of the reference be pen changed to reflect "FY 82" vice "FY 81". DISTRIBUTION: By direction (see attached pages) i4...Falls Church, VA 22041 3 Marine Corps Liaison Officer Naval Weapons Center China Lake, CA 93555 Marine Corps Liaison Officer HQ MASSTER Ft. Hood, TX...Center, Hawaii Lab P. 0. Box 997 Kaihua, Hawaii 96734 Mr. Paul H. Amundson Code 3304 Naval Weapons Center China Lake, CA 93555 Naval Surface Weapons

  16. Geophysics Funding Healthy in FY 1986 Federal Budget

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.; Robb, David W.

    Continued support for many geophysics projects is part of the fiscal year (FY) 1986 budget proposal that President Ronald Reagan sent to Congress earlier this month. Unlike many other programs that took deep cuts or were eliminated, overall funding for science held steady in the proposed budget. This budget proposal, however, did not offer the large increases that had been proposed for FY 1985 (Eos, February 14, 1984, p. 49). Figure 1 shows the trend for science outlays during the past several years.

  17. FY 1990/FY 1991 Biennial Budget Descriptive Summaries for the Strategic Defense Initiative Organization

    DTIC Science & Technology

    1989-01-01

    size, weight , power consumption, and radiation hardness, and on software algorithm validity and efficiency. 3. (U) Collection of radar, ctical, and...which have potential to achieve cooling requirements for LWIR sensors with far smaller weight and power penalties. (U) FY1989 Planned Program: o (U...two dollars for every SDI dollar. o (U) Inverted gaili--n arsenide by growing a razor-thin layer of silicon on GaAs and thus cut power loss by two

  18. Guide to the NITRD Program FY 2004-FY 2005. Supplement to the President’s Budget for FY 2005

    DTIC Science & Technology

    2004-12-01

    electronic medical records systems . At the core of such systems is the concept of a secure, patient-centered electronic health record ( EHR ) that: 1...support the development of an NHII that includes an Electronic Health Record System ( EHRS ). The EHRS will be a longitudinal collection of electronic... health information for and about persons. It will allow electronic access to person- and population-level information by authorized users. The system

  19. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    NASA Technical Reports Server (NTRS)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  20. 75 FR 60715 - Domestic Sugar Program-FY 2010 and FY 2011 Cane Sugar and Beet Sugar Marketing Allotments and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...,716 Hawaii Gay & Robinson, Inc 72,401 -18,673 -50,592 3,136 Hawaiian Commercial & Sugar Company... & Sons 495,489 Total Louisiana 1,620,472 Texas: Rio Grande Valley 182,094 Hawaii: Gay & Robinson, Inc 73...

  1. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    DTIC Science & Technology

    2009-04-03

    resources in a few low- and low- middle income countries that have demonstrated a strong commitment to political, economic, and social reforms. The...several other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian

  2. Research administration, state planning & research part II program : FY2012 at-a-glance.

    DOT National Transportation Integrated Search

    2012-01-01

    This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year (FY) 2012. The tables on pages 2 through 7 list all MDOT-funded research projects by focus area that were active or completed during 2...

  3. Research administration, state planning & research part II program : FY2013 at-a-glance.

    DOT National Transportation Integrated Search

    2014-01-01

    This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year : (FY) 2013. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active : or completed duri...

  4. 75 FR 11841 - Repowering Assistance Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... application window. SUMMARY: RBS is announcing a new application window to submit applications for the...-time application window for remaining FY 2009 funds. Paperwork Reduction Act In accordance with the... allocate all of the FY 2009 authorized funds. Therefore, the Agency is opening a new application window to...

  5. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2008

    DOT National Transportation Integrated Search

    2012-09-30

    In FY 2008, Federal and State enforcement personnel conducted 14,906 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers...

  6. U.S. Geological Survey Science for the Wyoming Landscape Conservation Initiative-2010 Annual Report

    USGS Publications Warehouse

    Bowen, Zachary H.; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Biewick, Laura; Blecker, Steven W.; Boughton, Gregory K.; Bristol, R. Sky; Carr, Natasha B.; Chalfoun, Anna D.; Chong, Geneva W.; Clark, Melanie L.; Diffendorfer, Jay E.; Fedy, Bradley C.; Foster, Katharine; Garman, Steven L.; Germaine, Stephen S.; Holloway, JoAnn; Homer, Collin G.; Kauffman, Matthew J.; Keinath, Douglas; Latysh, Natalie; Manier, Daniel J.; McDougal, Robert R.; Melcher, Cynthia P.; Miller, Kirk A.; Montag, Jessica; Potter, Christopher J.; Schell, Spencer; Shafer, Sarah L.; Smith, David B.; Stillings, Lisa L.; Tuttle, Michele L.W.; Wilson, Anna B.

    2011-01-01

    This is the third report produced by the U.S. Geological Survey (USGS) for the Wyoming Landscape Conservation Initiative (WLCI) to detail annual work activities. The first report described activities for 2007 and 2008, and the second report covered work activities for FY09. This third report covers work activities conducted in FY2010, and it continues the 2009 approach of reporting on all the individual activities to help give WLCI partners and other readers the full scope of what has been accomplished. New in this year's report is an additional section for each work activity that outlines the work planned for the following fiscal year. In FY2010, there were 35 ongoing/expanded, completed, or new projects conducted under the five major multi-disciplinary science and technical-assistance activities: (1) Baseline Synthesis; (2) Targeted Monitoring and Research; (3) Data and Information Management; (4) Integration and Coordination; and (5) Decisionmaking and Evaluation. The three new work activities were to (1) compile existing water data for the entire WLCI region and (2) develop regional curves (statistical models) for relating bankfull-channel geometry and discharge to drainages in the WLCI region, both of which will help guide long-term monitoring of water resources; and (3) initiate a groundwater-monitoring network to evaluate potential effects of energy-development activities on groundwater quality where groundwater is an important source of public/private water supplies. Results of the FY2009 work to develop methods for assessing soil organic matter and mercury indicated that selenium and arsenic levels may be elevated in the Muddy Creek Basin; thus, the focus of that activity was shifted in FY2010 to evaluate biogeochemical cycling of elements in the basin. In FY2010, two ongoing activities were expanded with the addition of more sampling plots: (a) the study of how greater sage-grouse (Centrocercus urophasianus) use vegetation-treatment areas (sites added to the Moxa Arch Natural Gas Development area) and (2) the study of cheatgrass (Bromus tectorum) occurrence in burn treatments of the Little Mountain Ecosystem. The activity that entails evaluating relationships between ungulate herbivory and fire on aspen (Populus tremuloides) recruitment also was expanded to include relationships between stand characteristics of and herbivory on aspen in various ecohydrological settings. The USGS continued compiling data and developing geospatial products from all of its WLCI activities to support (1) ranking and prioritizing of proposed conservation projects, (2) developing the WLCI Integrated Assessment, and (3) developing the WLCI 5-year Conservation Action Plan. Two activities were completed in FY2010: (1) the conceptual modeling and indicator selection for monitoring resource conditions across the WLCI region, and (2) the literature review on effects of oil and gas development in western regions of the United States, both of which are in the last stages of publication.

  7. Influences on the Timing and Frequency of Cancellations and Truncations of Major Defense Acquisition Programs

    DTIC Science & Technology

    2017-03-01

    the start of the bust phase following the Carter-Reagan boom. From peak procurement Budget Authority of $183.9 billion (FY 2017 dollars) in FY 1985...to close a funding gap involves choices among bad alternatives—cancellations, delays in new starts , stretches of existing programs, acceptance of...less capable alternatives in some cases, and adoption of very optimistic costing and programmatic decisions for both new starts and—to the extent

  8. NASA Occupational Health Program FY98 Self-Assessment

    NASA Technical Reports Server (NTRS)

    Brisbin, Steven G.

    1999-01-01

    The NASA Functional Management Review process requires that each NASA Center conduct self-assessments of each functional area. Self-Assessments were completed in June 1998 and results were presented during this conference session. During FY 97 NASA Occupational Health Assessment Team activities, a decision was made to refine the NASA Self-Assessment Process. NASA Centers were involved in the ISO registration process at that time and wanted to use the management systems approach to evaluate their occupational health programs. This approach appeared to be more consistent with NASA's management philosophy and would likely confer status needed by Senior Agency Management for the program. During FY 98 the Agency Occupational Health Program Office developed a revised self-assessment methodology based on the Occupational Health and Safety Management System developed by the American Industrial Hygiene Association. This process was distributed to NASA Centers in March 1998 and completed in June 1998. The Center Self Assessment data will provide an essential baseline on the status of OHP management processes at NASA Centers. That baseline will be presented to Enterprise Associate Administrators and DASHO on September 22, 1998 and used as a basis for discussion during FY 99 visits to NASA Centers. The process surfaced several key management system elements warranting further support from the Lead Center. Input and feedback from NASA Centers will be essential to defining and refining future self assessment efforts.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2011. The associated FY 2011 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2010. The associated FY 2010 ORNL LDRD Self-Assessment (ORNL/PPA-2011/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  11. Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017.

    PubMed

    Watson, Crystal R; Watson, Matthew; Sell, Tara Kirk

    2017-09-01

    To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained.

  12. Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017

    PubMed Central

    Sell, Tara Kirk

    2017-01-01

    Objectives. To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. Methods. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. Results. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. Conclusions. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained. PMID:28892451

  13. Examination of the Open Market Corridor

    DTIC Science & Technology

    2003-12-01

    105 D. BENEFITS OF THE PURCHASE CARD PROGRAM ..........................107 1. List of Benefits ...107 2. Additional Benefits and How OMC Can Increase the Benefits ...107 E. WEAKNESSES OF...software licenses and support services. Estimated life-cycle costs for FY 1995 through FY 2005 are $3.7 billion. Operational benefits from SPS are

  14. 75 FR 37873 - Notice of Funding Availability for the Department of Transportation's National Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... Investments Under the Transportation, Housing and Urban Development, and Related Agencies Appropriations Act... grant program under the FY 2010 Appropriations Act. The DOT is referring to the grants for National... FY 2010 Appropriations Act, the DOT will evaluate all applications and announce the projects that...

  15. 45 CFR 305.42 - Penalty phase-in.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAM PERFORMANCE MEASURES, STANDARDS, FINANCIAL INCENTIVES, AND PENALTIES § 305.42 Penalty phase-in. States are subject to the performance penalties described in § 305.40 based on data reported for FY 2001. Data reported for FY 2000 will be used as a base year to determine improvements in performance during...

  16. Colorado Children's Budget 2012

    ERIC Educational Resources Information Center

    Buck, Beverly; Cuciti, Peggy L.; Baker, Robin

    2012-01-01

    The "Colorado Children's Budget 2012" examines the state's commitment to investing in the well-being of children. It tallies up Colorado's actual and planned investment during the past five years (Fiscal Year (FY) 2008-2009 through FY 2012-2013) on programs and services in four areas: Early Childhood Learning and Development, K-12…

  17. Colorado Children's Budget 2011

    ERIC Educational Resources Information Center

    Colorado Children's Campaign, 2011

    2011-01-01

    "Colorado Children's Budget 2011" tallies up Colorado's public investments during FY 2007-08 through FY 2011-12 for programs and services that enhance the well-being of children across four domains--Early Childhood, K-12 Education, Health, and Other Supports. It is intended to be a resource guide for policymakers and advocates who are…

  18. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2007

    DOT National Transportation Integrated Search

    2012-09-30

    In FY 2007, Federal and State enforcement personnel conducted more than 15,000 CRs on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers will impro...

  19. U.S. Army Research Institute Program in Basic Research FY 2005 and FY 2006

    DTIC Science & Technology

    2007-11-01

    designed to tap different levels of processing-from visual attention (measured via eye-tracking) and interpretation through memory and decision-making (e.g...Test ( EFT ; Witkin, 1950; Witkin, Dyk, Faterson, Goodenough, & Karp, 1962) modified for group administration. It measures competence in perceptual field

  20. Space directorate research and technology accomplishments for FY 1988

    NASA Technical Reports Server (NTRS)

    Avery, Don E. (Compiler)

    1989-01-01

    The major accomplishments and test highlights for FY 1988 that occurred in the Space Dirctorate are given. Accomplishments and test highlights are presented by Division and Branch. The presented information will be useful in program coordination with government organizations, universities, and industry in areas of mutual interest.

  1. Military Manpower Training Report for FY 1976.

    ERIC Educational Resources Information Center

    Office of the Assistant Secretary of Defense for Manpower and Reserve Affairs (DOD), Washington, DC.

    The document presents anticipated needs and costs for training military personnel in FY 1976, based on national security objectives. Training loads for each of the following categories are presented with supporting tables: (1) recruit training, (2) officer acquisition training, (3) specialized skill training, (4) flight training programs, and (5)…

  2. 75 FR 66773 - Notice of Proposed Information Collection for Public Comment; FY 2010 Capital Fund Community and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... early childhood education, adult education, and/or job training programs for public housing residents... Information Collection for Public Comment; FY 2010 Capital Fund Community and Education Training Facilities... 2010 Capital Fund Community and Education Training Facilities NOFA. OMB Control Number: 2577-0268...

  3. Intelligent Vehicle Mobility M&S Capability Development (FY13 innovation Project) (Briefing Charts)

    DTIC Science & Technology

    2014-05-19

    Intelligent Vehicle Mobility M&S Capability Development (FY13 Innovation Project) P. Jayakumar and J. Raymond, Analytics 19 May 2014...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Paramsithy Jayakumar ; J Raymond 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING

  4. Satellite relay telemetry of seismic data in earthquake prediction and control

    USGS Publications Warehouse

    Jackson, Wayne H.; Eaton, Jerry P.

    1971-01-01

    The Satellite Telemetry Earthquake Monitoring Program was started in FY 1968 to evaluate the applicability of satellite relay telemetry in the collection of seismic data from a large number of dense seismograph clusters laid out along the major fault systems of western North America. Prototype clusters utilizing phone-line telemetry were then being installed by the National Center for Earthquake Research (NCER) in 3 regions along the San Andreas fault in central California; and the experience of installing and operating the clusters and in reducing and analyzing the seismic data from them was to provide the raw materials for evaluation in the satellite relay telemetry project.

  5. Hanford Quarter Seismic Report - 98C Seismicity On and Near the Hanford Site, Pasco Basin, Washington: April 1, 1998 Through June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DC Hartshorn, SP Reidel, AC Rohay

    1998-10-23

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. The staff also locates aud identifies sources of seismic activity and monitors changes in the hi~orical pattern of seismic activity at the Hanford Site. The data are. compiled archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of zinmore » earthquake on the Hanford Site. The HSN and Ihe Eastern Washington Regional Network (EN/RN) consist-of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The operational rate for the third quarter of FY 1998 for stations in the HSN was 99.99%. The operational rate for the third quarter of FY 1998 for stations of the EWRN was 99.95%. For the third quarter of FY 1998, the acquisition computer triggered 133 times. Of these triggers 11 were local earthquakes: 5 (45Yo) in the Columbia River Basalt Group, 2(1 8%) in the pre-basalt sediments, and 4 (36%) in the crystalline basement. The geologic and tectonic environments where these earthquakes occurred are discussed in this report.« less

  6. Hanford Quarter Seismic Report - 98C Seismicity On and Near the Hanford Site, Pasco Basin, Washington: April 1, 1998 Through June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DC Hartshorn, SP Reidel, AC Rohay.

    1998-10-23

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. The staff also locates aud identifies sources of seismic activity and monitors changes in the hi orical pattern of seismic activity at the Hanford Site. The data are. compiled archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event ofmore » zin earthquake on the Hanford Site. The HSN and Ihe Eastern Washington Regional Network (EN/RN) consist-of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The operational rate for the third quarter of FY 1998 for stations in the HSN was 99.99%. The operational rate for the third quarter of FY 1998 for stations of the EWRN was 99.95%. For the third quarter of FY 1998, the acquisition computer triggered 133 times. Of these triggers 11 were local earthquakes: 5 (45Yo) in the Columbia River Basalt Group, 2(1 8%) in the pre-basalt sediments, and 4 (36%) in the crystalline basement. The geologic and tectonic environments where these earthquakes occurred are discussed in this report.« less

  7. Microgravity science and applications: Program tasks and bibliography for FY 1992

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This report is a compilation of the FY 1992 Principal Investigator program task descriptions funded by the Microgravity Science and Applications Division (MSAD), NASA Headquarters, Washington, DC. The document also provides a bibliography of FY 1992 publications and presentations cited by MSAD Principal Investigators, and an index of the Principal Investigators and their affiliations. The purpose of the document is to provide an overview and progress report for the funded tasks for scientists and researchers in industry, university, and government communities. The tasks are grouped into three categories appropriate to the type of research being done-space flight, ground based, and advanced technology development-and by science discipline. The science disciplines are: biotechnology, combustion science,, electronic materials, fluid physics, fundamental physics, glass and ceramics, metals and alloys, and protein crystal growth.

  8. FY2017 Electrification Annual Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    During fiscal year 2017 (FY 2017), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance Electric Motors and Power Electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance Grid Modernization and Electric Vehicle Charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Eachmore » of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2017.« less

  9. ARIES Oxide Production Program Assessment of Risk to Long-term Sustainable Production Rate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitworth, Julia; Lloyd, Jane Alexandria; Majors, Harry W.

    2017-05-04

    This report describes an assessment of risks and the development of a risk watch list for the ARIES Oxide Production Program conducted in the Plutonium Facility at LANL. The watch list is an active list of potential risks and opportunities that the management team periodically considers to maximize the likelihood of program success. The initial assessments were made in FY 16. The initial watch list was reviewed in September 2016. The initial report was not issued. Revision 1 has been developed based on management review of the original watch list and includes changes that occurred during FY-16.

  10. Inspector General, DOD, Oversight of the Army Audit Agency Audit of the FY 1999 U.S. Army Corps of Engineers, Civil Works Program, Financial Statements

    DTIC Science & Technology

    2000-02-28

    iIÄ»lllilil^» P «lMlii fport INSPECTOR GENERAL, DOD, OVERSIGHT OF THE ARMY AUDIT AGENCY AUDIT OF THE FY 1999 U.S. ARMY CORPS OF ENGINEERS, CIVIL...WORKS PROGRAM, FINANCIAL STATEMENTS Report No. D -2000-093 February 28, 2000 pnc QXIAUTY mm®™* i 0ffice Qf ±Q hispdCtor General Department of...Works Program, Financial Statements (Report No. D -2000-093) We are providing this audit report for your information and use and for transmittal to

  11. Fact Sheet: Selected Highlights of the FY2017 National Defense Authorization Act (H.R. 4909)

    DTIC Science & Technology

    2016-05-12

    shaped by the legally binding caps on discretionary spending for defense programs and for non-defense programs, which were established by P.L. 114-74...of Defense (DOD) funding for FY2017 that (1) exceeds the relevant BBA cap ; and (2) is exempt from that spending cap because it is classified as...funding for so- called Overseas Contingency Operations (OCO). The 2015 BBA increased binding caps on defense and non-defense discretionary appropriations

  12. Building America Systems Integration Research Annual Report. FY 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gestwick, Michael

    2013-05-01

    This Building America FY2012 Annual Report includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

  13. NASA agenda for tomorrow

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Key elements of national policy, NASA goals and objectives, and other materials that comprise the framework for NASA planning are included. The contents are expressed as they existed through much of 1988; thus they describe the strategic context employed by NASA in planning both the FY 1989 program just underway and the proposed FY 1990 program. NASA planning will continue to evolve in response to national policy requirements, a changing environment, and new opportunities. Agenda for Tomorrow provides a status report as of the time of its publication.

  14. Summary of Activities for Health Monitoring of Composite Overwrapped Pressure Vessels

    NASA Technical Reports Server (NTRS)

    Russell, Rick

    2012-01-01

    This new start project (FY12-14) will design and demonstrate the ability of nondestructive evaluation sensors for the measurement of stresses on the inner diameter of a Composite Overwrapped Pressure Vessel overwrap. Results will be correlated with other nondestructive evaluation technologies such as Acoustic Emission. The project will build upon a proof of concept study performed at KSC which demonstrated the ability of Magnetic Stress Gages to measure stresses at internal overwraps and upon current acoustic emission research being performed at WSTF; The gages will be produced utilizing Maundering Winding Magnetometer and/or Maundering Winding Magnetometer-array eddy current technology. The proof-of-concept study demonstrated a correlation between the sensor response and pressure or strain. The study also demonstrated the ability of Maundering Winding Magnetometer technology to monitor the stresses in a Composite Overwrapped Pressure Vessel at different orientations and depths. The ultimate goal is to utilize this technology for the health monitoring of Composite Overwrapped Pressure Vessels for all future flight programs.

  15. Billions for biodefense: federal agency biodefense funding, FY2009-FY2010.

    PubMed

    Franco, Crystal

    2009-09-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through 2009. This article updates those figures with budgeted amounts for FY2010, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, and State; the Environmental Protection Agency; and the National Science Foundation. This year's article also provides an assessment of the proportion of the biodefense budget that serves multiple programmatic goals and benefits, including research into infectious disease pathogenesis and immunology, public health planning and preparedness, and disaster response efforts. The FY2010 federal budget for civilian biodefense totals $6.05 billion. Of that total, $4.96 billion is budgeted for programs that serve multiple goals and provide manifold benefits.

  16. FY16 LLNL Omega Experimental Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heeter, R. F.; Ali, S. J.; Benstead, J.

    In FY16, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112more » EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.« less

  17. Fiscal Year (FY) 2001 Budget Estimates. Army National Guard. Military Construction Program FY 2001. Justification Data Submission to Congress. Department of the Army.

    DTIC Science & Technology

    2000-02-01

    CONSIDERATIONS ix-xx FUTURE YEARS DEFENSE PLAN AUDIT TRAIL xxi-xxiii PROJECT JUSTIFICATION DOCUMENTS 1-149 PLANNING & DESIGN JUSTIFICATION DOCUMENT 15 0...OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DDl°™1390s2 MAY 78 1. COMPONENT FY 2001 GUARD AND RESERVE 2. DATE ARNG MILITARY CONSTRUCTION FEB00 3...TOTAL 36 286 13 MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED 14. OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DD:A O™1390S2 1

  18. Report of the Secretary of Defense Caspar W. Weinberger to the Congress on the FY 1987 Budget, FY 1988 Authorization Request and FY 1987-1991 Defense Programs, February 5, 1986

    DTIC Science & Technology

    1986-02-05

    saries. When have these values -- freedom of individual citizens, democratically chosen governments, market economies, and a lawful international economic...to the plan of action for pene- trating a new market . In addition to the broad goals of the firm, strategy encompasses key operating policies by...threats on the other. A sustainable corporate strategy must match the particular strengths of the corporation with competitive forces in its markets

  19. Department of the Navy FY 1990/FY 1991 Biennial Budget Estimates. Military Construction and Family Housing Program FY 1991. Justification Data Submitted to Congress

    DTIC Science & Technology

    1989-01-01

    environmental review process as indicated by the County Traffic Engineers for safe and secure transport of ordnance as well as the chosen alternative...from other appropriations: None. PRVOSEDITION$ MAY SE USED ITRALDD DE 7 PG NO.DD • 391C UNTIL XHAUSTEDP N. S.PRRMELMN . CATGOR OO 7..POETNMER U JC...service. IMPACT IF NOT PROVIDED: Activity must rely r.n truck refuelers which are not Capable of handling the demand. Time delays, logisticA and safety

  20. Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-08

    Search Radar modification to CVN–79 and CVN–80. (G) A business case analysis for the two-phase CVN–79 delivery proposal and impact on fleet...the start-stop-start-stop cycle over a stretched period of time and that’s a big cost impact . But the challenge is by the same token, the build cycle...What are the estimated savings of this proposal in FY2017, and over the FY2017-FY2021 Future Years Defense Plan (FYDP)?  What impact would

  1. Independent Auditors Report on the FY 2015 DoD Detailed Accounting Report for the Funds Obligated for National Drug Control Program Activities

    DTIC Science & Technology

    2016-01-29

    No. DODIG-2016-041 J A N U A R Y 2 9 , 2 0 1 6 Independent Auditor’s Report on the FY 2015 DoD Detailed Accounting Report for the Funds...Defense that supports the warfighter; promotes accountability , integrity, and efficiency; advises the Secretary of Defense and Congress; and informs...THE ARMY SUBJECT: Independent Auditor’s Report on the FY 2015 DoD Detailed Accounting Report for the Funds Obligated for National Drug Control

  2. FY 1977 Budget and its Implications for the FY 1978 Authorization Request and the FY 1977-1981 Defense Programs

    DTIC Science & Technology

    1976-01-27

    further support reductions would be inadvisable. Therefore, it may be necessaty to maintain the combat-to-support ratio at Vie post-Nunn Amendment level...263 Acquisition of the A-10 Clow Art Support Aircraft 266 457 81 618 927 Durefopment and Acquisition of E-3A AWACS 1 610 466 8t 684 466 Oftelopment n...understanding of both pertinent technology a’nd management principles to ensure their continued contribution to the force, Such schooling , whether geared to

  3. Introduction to Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Kohrs, Richard

    1992-01-01

    NASA field centers and contractors are organized to develop 'work packages' for Space Station Freedom. Marshall Space Flight Center and Boeing are building the U.S. laboratory and habitation modules, nodes, and environmental control and life support system; Johnson Space Center and McDonnell Douglas are responsible for truss structure, data management, propulsion systems, thermal control, and communications and guidance; Lewis Research Center and Rocketdyne are developing the power system. The Canadian Space Agency (CSA) is contributing a Mobile Servicing Center, Special Dextrous Manipulator, and Mobile Servicing Center Maintenance Depot. The National Space Development Agency of Japan (NASDA) is contributing a Japanese Experiment Module (JEM), which includes a pressurized module, logistics module, and exposed experiment facility. The European Space Agency (ESA) is contributing the Columbus laboratory module. NASA ground facilities, now in various stages of development to support Space Station Freedom, include: Marshall Space Flight Center's Payload Operations Integration Center and Payload Training Complex (Alabama), Johnson Space Center's Space Station Control Center and Space Station Training Facility (Texas), Lewis Research Center's Power System Facility (Ohio), and Kennedy Space Center's Space Station Processing Facility (Florida). Budget appropriations impact the development of the Space Station. In Fiscal Year 1988, Congress appropriated only half of the funds that NASA requested for the space station program ($393 million vs. $767 million). In FY 89, NASA sought $967 million for the program, and Congress appropriated $900 million. NASA's FY 90 request was $2.05 billion compared to an appropriation of $1.75 billion; the FY 91 request was $2.45 billion, and the appropriation was $1.9 billion. After NASA restructured the Space Station Freedom program in response to directions from Congress, the agency's full budget request of $2.029 billion for Space Station Freedom in FY 92 was appropriated. For FY 93, NASA is seeking $2.25 billion for the program; the planned budget for FY 94 is $2.5 billion. Further alterations to the hardware configuration for Freedom would be a serious setback; NASA intends 'to stick with the current baseline' and continue planning for utilization.

  4. 75 FR 341 - FY 2010-FY 2011 Broad Agency Announcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Agency's strategic plan and mission goals, as well as to provide the general public with information and... and programs associated with the Agency's strategic plan and mission goals, as well as to provide the... systematic approach that links our strategic goals through multi-year plans to the daily activities of our...

  5. Data and Characteristics of the Illinois Public Community College System.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    Data on the Illinois public community colleges, covering fiscal year (FY) 1991 and part of FY 1992, are presented in this report on the system's students, faculty, staff, instructional programs, operating finances, and capital construction. Introductory material provides a profile of the colleges, a map of college districts, and a list of…

  6. Data and Characteristics of the Illinois Public Community College System.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    Data on the Illinois public community colleges, covering fiscal year (FY) 1990 and part of FY 1991, are presented in this report on the system's students, faculty, staff, instructional programs, operating finances, and capital construction. After introductory material provides a profile of the colleges and a map of college districts, section I…

  7. 78 FR 45187 - Notice of a Joint Technical Assistance Workshop for Preparing Fiscal Year (FY) 2014 Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... for programs authorized by Title VI of the Higher Education Act (HEA) that the Department expects to... DEPARTMENT OF EDUCATION Notice of a Joint Technical Assistance Workshop for Preparing Fiscal Year (FY) 2014 Grant Applications AGENCY: International and Foreign Language Education, Office of...

  8. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft report.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding : of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or : "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement ...

  9. Genome-wide association study for identifying genome loci that affect fillet yield in rainbow trout (Oncorhynchus mykiss)

    USDA-ARS?s Scientific Manuscript database

    Fillet yield (FY, %) is an economically important trait in rainbow trout aquaculture that reflects production efficiency. Despite that, FY has not received much attention in breeding programs because it is costly to measure and difficult to select on, limiting the genetic progress in traditional sel...

  10. Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress

    DTIC Science & Technology

    2015-12-22

    the ships. The Navy continues to review manning to determine appropriate levels, and is adding 20 berths to all seaframes. The increased berthing ...ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the FY2010 ships and the other team getting one

  11. Supersonic Cruise Research (SCR) program publications for fiscal year 1977 through fiscal year 1979: Preliminary bibliography. [bibliographies

    NASA Technical Reports Server (NTRS)

    Hoffman, S.

    1979-01-01

    Approximately 512 bibliographies are presented for the time period from FY 77 to FY 79. Several non-SCR publications and a few papers not included in the last publication are included. Topics include propulsion, stratospheric emissions impact, materials and structure, aerodynamic performance, and stability and control.

  12. 75 FR 63848 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... application process, funding criteria and eligibility requirements can be found using the Department of... Education and Training Community Facilities (CFCF) Program is 14-890. Applications must be submitted...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Capital Fund Education and Training...

  13. 78 FR 71555 - Medicare Program; Town Hall Meeting on FY 2015 Applications for New Medical Services and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... FY 2015 new medical services and technologies applications meet the substantial clinical improvement... new medical services and technologies under Medicare. Effective for discharges beginning on or after... specifies that a medical service or technology will be considered ``new'' if it meets criteria established...

  14. 78 FR 7750 - Emergency Food Assistance Program; Availability of Foods for Fiscal Year 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ..., fish, vegetables, dry beans, juices, and fruits. Approximately $274.5 million in surplus foods acquired in FY 2012 are being delivered to States in FY 2013. These foods include beans (dried, canned..., frozen ham, frozen turkey roast, blackeye beans, garbanzo beans, great northern beans, light red kidney...

  15. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  16. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft executive summary.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...

  17. 76 FR 59265 - Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Skilled Nursing Facilities for FY 2012; Correction AGENCY: Centers for Medicare & Medicaid Services (CMS... Nursing Facilities for FY 2012'' that appeared in the August 8, 2011 Federal Register. DATES: Effective... October 1, 2011. II. Summary of Errors The Addendum to the Skilled Nursing Facility (SNF) Prospective...

  18. Evaluation of Educational Personnel Development Projects in Indian Education. Final Report.

    ERIC Educational Resources Information Center

    Wechsler, Marjorie E.; And Others

    The Educational Personnel Development (EPD) program provides training for educational personnel to serve American Indian and Alaska Native students. From FY 1987 to FY 1991, EPD grants averaging $2.25 million per year were awarded to 21 institutions, which provided academic counseling, direct financial assistance, and supplemental training to a…

  19. Venus Data Analysis Program: Directory of Research Projects (1993-1994)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This directory provides information about the scientific investigations funded by the NASA Venus Data Analysis Program (VDAP) during fiscal year 1993. The VDAP Directory consists of summary sheets from the proposals that were selected by NASA for funding in FY 93. Each summary sheet indicates the title, principal investigator, institution of the investigation, and information related to the objectives of the research activities proposed for FY 93. The objective of the VDAP Program is to advance our understanding of the nature and evolution of Venus. VDAP supports scientific investigation using data obtained from the Magellan, Pioneer Venus, and other Venus missions, as well as earth-based observations that contribute to understanding the physical and evolutionary properties of Venus. The program intends to enhance the scientific return from these missions by broadening the participation in the analysis of Venus data. Categories of research funded by VDAP are atmosphere, ionosphere, geology, geophysics, and mapping. The directory is intended to provide the science community with an overview of the research projects supported by this program. Research activities identified in this directory were selected for funding in FY 93 on the basis of scientific peer review conducted by the VDAP Review Panel.

  20. Independent Auditors Report on the Air Force Working Capital Fund FY 2015 and FY 2014 Basic Financial Statements for United States Air Force Agency Financial Report 2015

    DTIC Science & Technology

    2015-11-09

    missile warning, weather and intelligence warfighting support. AFSPC operates sensors that provide direct attack warning and assessment to U.S...toughness combinations. AFRL conducted low-speed wind tunnel tests of 9%-scale model completed at NASA Langley Research Center (LaRC); data validated... wireless mobile monitoring capability designed for dismounted Pararescue Jumpers (PJ) called United States Air Force 89 Battlefield Airmen Trauma

  1. Integrity Assessment of E1-E3 Sailors at Naval Submarine School: FY2007 - FY2011

    DTIC Science & Technology

    2012-01-01

    5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Submarine Learning Center,Groton,CT,06349 8. PERFORMING... ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT...School, FT “A” School, STS“A” School, BESS, ATT E-CORE, TACT COMPS, SUB OFF BASIC, SOIC , CSRR Operator, and Basic Mechanical Skills. Submarine

  2. Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities for FY 2017, SNF Value-Based Purchasing Program, SNF Quality Reporting Program, and SNF Payment Models Research. Final rule.

    PubMed

    2016-08-05

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2017. In addition, it specifies a potentially preventable readmission measure for the Skilled Nursing Facility Value-Based Purchasing Program (SNF VBP), and implements requirements for that program, including performance standards, a scoring methodology, and a review and correction process for performance information to be made public, aimed at implementing value-based purchasing for SNFs. Additionally, this final rule includes additional polices and measures in the Skilled Nursing Facility Quality Reporting Program (SNF QRP). This final rule also responds to comments on the SNF Payment Models Research (PMR) project.

  3. Indiana chronic disease management program risk stratification analysis.

    PubMed

    Li, Jingjin; Holmes, Ann M; Rosenman, Marc B; Katz, Barry P; Downs, Stephen M; Murray, Michael D; Ackermann, Ronald T; Inui, Thomas S

    2005-10-01

    The objective of this study was to compare the ability of risk stratification models derived from administrative data to classify groups of patients for enrollment in a tailored chronic disease management program. This study included 19,548 Medicaid patients with chronic heart failure or diabetes in the Indiana Medicaid data warehouse during 2001 and 2002. To predict costs (total claims paid) in FY 2002, we considered candidate predictor variables available in FY 2001, including patient characteristics, the number and type of prescription medications, laboratory tests, pharmacy charges, and utilization of primary, specialty, inpatient, emergency department, nursing home, and home health care. We built prospective models to identify patients with different levels of expenditure. Model fit was assessed using R statistics, whereas discrimination was assessed using the weighted kappa statistic, predictive ratios, and the area under the receiver operating characteristic curve. We found a simple least-squares regression model in which logged total charges in FY 2002 were regressed on the log of total charges in FY 2001, the number of prescriptions filled in FY 2001, and the FY 2001 eligibility category, performed as well as more complex models. This simple 3-parameter model had an R of 0.30 and, in terms in classification efficiency, had a sensitivity of 0.57, a specificity of 0.90, an area under the receiver operator curve of 0.80, and a weighted kappa statistic of 0.51. This simple model based on readily available administrative data stratified Medicaid members according to predicted future utilization as well as more complicated models.

  4. Quantitative retrieval of aerosol optical thickness from FY-2 VISSR data

    NASA Astrophysics Data System (ADS)

    Bai, Linyan; Xue, Yong; Cao, Chunxiang; Feng, Jianzhong; Zhang, Hao; Guang, Jie; Wang, Ying; Li, Yingjie; Mei, Linlu; Ai, Jianwen

    2010-11-01

    Atmospheric aerosol, as particulate matter suspended in the air, exists in a variety of forms such as dust, fume and mist. It deeply affects climate and land surface environment in both regional and global scales, and furthermore, lead to be hugely much influence on human health. For the sake of effectively monitoring it, many atmospheric aerosol observation networks are set up and provide associated informational services in the wide world, as well-known Aerosol robotic network (AERONET), Canadian Sunphotometer Network (AeroCan) and so forth. Given large-scale atmospheric aerosol monitoring, that satellite remote sensing data are used to inverse aerosol optical depth is one of available and effective approaches. Nowadays, special types of instruments aboard running satellites are applied to obtain related remote sensing data of retrieving atmospheric aerosol. However, atmospheric aerosol real-timely or near real-timely monitoring hasn't been accomplished. Nevertheless, retrievals, using Fengyun-2 VISSR data, are carried out and the above problem resolved to certain extent, especially over China. In this paper, the authors have developed a new retrieving model/mode to retrieve aerosol optical depth, using Fengyun-2 satellite data that were obtained by the VISSR aboard FY-2C and FY-2D. A series of the aerosol optical depth distribution maps with high time resolution were able to obtained, is helpful for understanding the forming mechanism, transport, influence and controlling approach of atmospheric aerosol.

  5. Pointing and control system enabling technology for future automated space missions

    NASA Technical Reports Server (NTRS)

    Dahlgren, J. B.

    1978-01-01

    Future automated space missions present challenging opportunities in the pointing-and-control technology disciplines. The enabling pointing-and-control system technologies for missions from 1985 to the year 2000 were identified and assessed. A generic mission set including Earth orbiter, planetary, and other missions which predominantly drive the pointing-and-control requirements was selected for detailed evaluation. Technology candidates identified were prioritized as planning options for future NASA-OAST advanced development programs. The primary technology thrusts in each candidate program were cited, and advanced development programs in pointing-and-control were recommended for the FY 80 to FY 87 period, based on these technology thrusts.

  6. 75 FR 33323 - Notice of Availability: Notice of HUD's Fiscal Year (FY) 2010 Notice of Funding Availability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...

  7. 75 FR 52771 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-08] Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Indian Community Development Block Grant... retained to fund Imminent Threat Grants. The purpose of the ICDBG program is the development of viable...

  8. Environmentally Responsible Aviation Project: Infrastructure Enhancements and New Capabilities

    NASA Technical Reports Server (NTRS)

    Bezos-OConnor, Gaudy M.

    2015-01-01

    This oral presentation highlights the technical investments the NASA Environmentally Responsible Aviation Project under the Integrated Systems Research Program within ARMD made during FY10-FY14 to upgrade/enhance the NASA infrastructure/testing assets and new capabilities required to mature the ERA N=2 Portfolio of airframe and propulsion technologies to TRL 5/6.

  9. 75 FR 34614 - Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... footnoted).'' c. Third column, the title, ``Table 4J.--Out-Migration Adjustment-- FY 2010 (April 1, 2010 through September 30, 2010)'' is corrected to read ``Table 4J.--(Abbreviated) Out-Migration Adjustment for... corrected to read as follows: Table 4J--(Abbreviated) Out-Migration Adjustment for Acute Care Hospitals--FY...

  10. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clapp, R.B.; Marshall, D.S.

    1992-06-01

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show thatmore » the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water.« less

  11. Building America Systems Integration Research Annual Report: FY 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gestwick, M.

    2013-05-01

    This document is the Building America FY2012 Annual Report, which includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

  12. Nasa Program Plan

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.

  13. The Lightning Mapping Imager (LMI) on the FY-4 satellite and a typical application experiment using the LMI data

    NASA Astrophysics Data System (ADS)

    Huang, F.; Hui, W.; Li, X.; Liu, R.; Zhang, Z.; Zheng, Y.; Kang, N.

    2017-12-01

    The Lightning Mapping Imager (LMI) on the FY-4A satellite, which was launched successfully in December 2016, is the first satellite-based lightning detector from space independently developed in China, and one of the world's first two stationary satellite LMIs. The optical imaging technique with a 400x600 CCD array plane and a frequency of 500 frames/s is adopted in the FY-4A LMI to perform real-time and continuous observation of total lightening in the Chinese mainland and adjacent areas. As of July 2017, the in-orbit test shows that the lightening observation date could be accurately obtained by the FY-4A LMI, and that the geo-location could be verified by the ground lightening observation network over China. Since the beginning of the 2017 flood season, every process of strong thunderstorms has been monitored by the FY-4A LMI throughout the various areas of China, and of these are used as a typical application case in this talk. On April 8 and 9, 2017, a strong convective precipitation process occurred in the middle-lower reaches of the Yangtze River, China. The observation data of the FY-4A LMI are used to monitor the occurrence, development, shift and extinction of the thunderstorm track. By means of analyzing the station's synchronous precipitation observation data, it is indicated that the moving track of the thunderstorm is not completely consistent with that of the precipitation center, and while the distribution areas of thunderstorm and precipitation are consistent to a certain extent, a significant difference also exists. This difference is mainly caused by the convective precipitation and stratus precipitation area during the precipitation process. Through comparative analysis, the preliminary satellite and foundation lightening observation data show a higher consistency. However, the time of lightening activity observed by satellite is one hour earlier than that of the ground observation, which is likely related to the total lightning observation by satellite rather than the cloud-ground lightning observation by the ground network. The application test shows that the FY-4A LMI can achieve the real-time and continuous observation on the lightening activity with a strong convective system. This is a significant technological breakthrough in China's lightening detection field.

  14. Energy materials coordinating committee (EMACC) Fiscal Year 1980. Annual technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1980-01-01

    This report contains information on the FY 1980 Department of Energy materials research and development programs and on those programs/projects with a significant materials activity. It was compiled by the Energy Materials Coordinating Committee (EMaCC). The previous report in this series summarized the FY 1979 programs (DOE/US-0002-2). The report is separated into sections, each containing programs reporting to one of six Assistant Secretaries of the Department: Conservation and Solar Energy, Defense Programs, Environment, Fossil Energy, Nuclear Energy, and Resource Applications; and one section, Energy Research, responsible to the Director of the Office of Energy Research. For convenience in locating themore » generic types of materials activities, an Appendix has been added that contains a primary keyword index.« less

  15. Education and Training Report. Performance Report, FY 1997

    NASA Technical Reports Server (NTRS)

    1997-01-01

    During FY 97, 152 MUREP education and training projects were conducted at OMU institutions. The institutions conducted precollege and bridge programs, education partnerships with other universities and industry, NRTS, teacher training, and graduate and/or PI undergraduate programs. These programs reached a total of 23,748 participants, with the predominant number at the precollege level and achieved major goals of heightening students' interest and awareness of career opportunities in MSET fields, and exposing students to the NASA mission, research and advanced technology through role models, mentors, and participation in research and other educational activities. Also in FY 1997, NASA continued a very meaningful relationship with the Hispanic Association of Colleges students and Universities (HACU) through Proyecto Access, a consortium through which HACU links seven HSI's together to conduct 8-week summer programs. OMU Institutions reported 4,334 high school student in NASA programs and 3,404 of those students selected college preparatory MSET courses. Three hundred and forty-nine (349) graduated from high school, 343 enrolled in college, and 199 selected MSET majors. There were 130 high school graduates (bridge students) in NASA programs, 57 of whom successfully completed their freshman year. There were 307 teachers in teacher programs and 48 teachers received certificates. Of the 389 undergraduate students, 75 received under graduate degrees, and eight students are employed in a NASA-related field.

  16. Department of the Navy FY 1990/FY 1991 Biennial Budget Estimates. Military Construction and Family Housing Program FY 1990. Justification Data Submitted to Congress

    DTIC Science & Technology

    1989-01-01

    Center, Panama City 314 Diver Training Building Addition 4,300 4 ,300 50 180 Subtotal 4,300 4,300 Navy Experimental Diving Unit 182 Panama City 347 ...Air Force 001 Security Training Center 4,500 4,500 100 345 Subtotal .4,500 4,500 TOTAL FOR TAS 28,220 28,220 Virginia Naval SecuritY Goui Activity 347 ...Building Addition 4,300 C NEDU Panama City, FL 347 Underwater Equipment Support Complex 2,900 C NPWC Pensacola, FL 109 Wastewater Transfer System 2,100 C

  17. FY2004 SYSTEM ENGINEER PROGRAM MANAGER ANNUAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JACKSON, G.J.

    2004-10-29

    During FY 2004, reviews of the FH System Engineer (SE) Program were conducted by the Independent Assessment (IA) Group. The results of these reviews are summarized as a part of this document. Additional reviews were performed by FH Engineering personnel. SE Engineering reviews performed include Periodic Walkdowns (typically, quarterly) by the SEs, a review of System Notebooks by the System Engineer Program Manager (SEPM), annual status report by each SE, and an annual status report by each of the Project Chief Engineers (PCEs). FY 2004 marked the completion of the first round of Vital Safety System assessments. Each of themore » VSSs on the FH VSS list has been evaluated at least once by either the FH Independent Assessment organization or was included as a part of DOE Phase II assessment. Following the completion of the K-Basins Assessment in May 2004, a review of the VSS assessment process was completed. Criteria were developed by FH, and concurred with by RL, to determine the frequency and priority of future VSS assessments. Additional actions have been taken to increase the visibility and emphasis assigned to VSSs. Completion of several Documented Safety Analyses (DSA), in combination with efforts to remove source term materials from several facilities, enabled the number of systems on the FH VSS list to be reduced from 60 at the beginning of FY 2004 to 48 by the end of FY 2004. It is expected that there will be further changes to the FH VSS list based on additional DSA revisions and continued progress towards reduction of source terms across the Hanford Site. Other new VSSs may be added to the list to reflect the relocation of materials away from the River Corridor to interim storage locations on the Central Plateau.« less

  18. Systemic Changes in the Undergraduate Chemistry Curriculum Program Awards

    NASA Astrophysics Data System (ADS)

    1995-07-01

    The National Science Foundation has awarded over 10 million in awards to four coalitions in the first round of full awards in the Systemic Changes in the Undergraduate Chemistry Curriculum program. Overall, more than 50 institutions, ranging from large universities to four-year and community colleges, are formally involved in these projects. Each of the projects will involve five years of curricular development and evaluation and dissemination of the results by the participating institutions, as described in the abstracts below. We encourage faculty who are interested in becoming involved in any of these projects to contact the appropriate coalition. In addition, we expect to begin offering an emphasis in 1997 under the Course and Curriculum Development program in which faculty can request funds to assist them in adapting and adopting at their own institutions curricular innovations that have been developed by these coalitions. Another round of proposals for full awards was accepted in June of 1995, and we expect to make one more award in the program during FY1996. We do not expect to accept proposals for either planning or full grants in this program in June of 1996. However, the regular Course and Curriculum Development program will continue to accept and fund proposals requesting support for smaller-scale changes in the chemistry curriculum. ChemLinks Coalition: Making Chemical Connections Brock Spencer Beloit College, Beloit, WI 53511 DUE 9455918: FY1995, 705,000; FY 1996, 655,000; FY1997, 655,000; FY1998, 350,00; FY1999, 350,000 The ChemLinks Coalition is undertaking a five-year project to change the way students learn chemistry, increase scientific literacy for all students taking chemistry, and promote the process of educational reform. In collaboration with the ModularChem Consortium, faculty are developing, testing, and disseminating modular course materials that use active and collaborative approaches to learning. These materials, focused on the first two years of the chemistry curriculum, start with interdisciplinary questions important to students and to society (the molecular basis of life, the environment, technology), and in answering them develop an appreciation of how science is actually done. This approach is designed to reach a broader student audience more effectively than do traditional courses, an audience that includes students who are members of groups traditionally underrepresented in science, nonscience majors, and those taking chemistry as a supporting course, as well as chemistry majors. By providing a model for students preparing for careers in teaching, this approach has an impact on Teacher Preparation Programs. Collaboration among faculty from different disciplines and a number of institutions supports and reinforces those who want to make changes. These leading liberal arts colleges (Beloit, Carleton, Colorado, Grinnell, Hope, Kalamazoo, Knox, Lawrence, Macalester, Rhodes, Spelman, St. Olaf, Wooster) and research universities (Chicago, Washington - St. Louis) already have experience working together on chemistry curricular reform. An alliance with the Advanced Technology Environmental Education Center's coalition of 2-year institutions assures an impact on Advanced Technology Education Programs. By using the extensive Project Kaleidoscope network to promote reform, the ChemLinks Coalition involves a much larger and more diverse group of institutions in making systemic and sustainable changes in undergraduate chemistry education. A Workshop Chemistry Curriculum David K. Gosser CUNY City College, New York, NY 10031 DUE 9455920: FY1995, 425,000; FY1996, 400,000; FY1997, 400,000; FY1998, 150,000; FY1999, 150,000 The City College Consortium, which includes ten senior and community colleges at the City University of New York, and the Universities of Pittsburgh, Pennsylvania, and Rochester, is developing and applying widely a new model of teaching. This model, called Workshop Chemistry, introduces participation and mentorship by recent completers of the course. Small group, student-led workshops are integral to the course structure. Every week two workshops, each an hour long, complement the lecture and laboratory components. The workshop model provides a collaborative learning experience that increases student involvement and provides a new role for students as mentors. In Workshop Chemistry, students learn the problem solving, communication, and teamwork skills crucial for success in the workplace while learning chemistry more effectively. Working together with the faculty, students become an active part of the community of the department. A prototype workshop model has been developed at City College in a general chemistry course for science and engineering majors and is being expanded and refined for a broad range of courses including preparatory chemistry, chemistry for allied health sciences, organic chemistry, instrumental, and analytical chemistry. The experience of students as workshop leaders provides a natural introduction to teaching that is being formalized through a Teacher Preparation component of the project. The workshop method is also being exploited and applied in curricula for technician education, an initiative relevant to Advanced Technology Education. The project evaluates Workshop Chemistry and disseminates it beyond the bounds of the consortium. Student Workshop Manuals that include the problem solving, model building, and simulation activities of the workshops are being produced for each course. New project partners will be invited to view workshops, to participate in faculty developments, and to implement pilot workshop courses at their own institutions. Sweeping Change in Manageable Units: A Modular Approach for Chemistry Curriculum Reform C. Bradley Moore University of California-Berkeley, Berkeley, CA 94720 DUE 9455924: FY1995, 755,000; FY1996, 705,000; FY1997, 705,000; FY1998, 350,000; FY1999, 350,000 The purpose of this program is to develop new curricula, materials and methods that will enhance the appreciation and learning of science, especially chemistry, for every undergraduate student such that all college graduates will command the knowledge and skills necessary to permit continued learning, lead productive lives, and make informed decisions. To accomplish this mission, a modular approach to teaching chemistry in the first two years of the undergraduate curriculum is being developed and evaluated. Modules of 1-4 weeks present fundamental chemistry to students in the context of a real-world problem or application and emphasize the links between chemistry and other disciplines. In collaboration with the ChemLinks Coalition, modules are being developed, tested and refined at the two- and four-year colleges and research universities comprising the two consortia. Curriculum materials, including text, lab, and multimedia components suitable for students from diverse cultural and ethnic backgrounds and usable at a wide variety of undergraduate institutions are being produced and distributed by an established publisher. Teaching methods that utilize current understanding of learning processes and emphasize active learning and the full spectrum of modern technologies are being supported, tested, and promulgated. A model support infrastructure for development and assessment of new materials and methods is being provided. A framework for continuous improvement of curricula should result from the work and be institutionalized within the consortium. Faculty workshops and sessions at national and regional meetings will be conducted to guarantee dissemination. Our consortium institutions now participate significantly in pre-service teacher training and education of advanced science or engineering technicians and are developing new programs in these areas. Thus, our program will strongly impact the Advanced Technological Education and Teacher Preparation Programs by developing modular materials appropriate to the task of educating future teachers and technicians. Establishing New Traditions: Revitalizing the Curriculum John W. Moore University of Wisconsin-Madison, Madison, WI 53706 DUE 9455928: FY1995, 949,968; FY1996, 899,999; FY1997, 899,941; FY1998, 499,941; FY1999, $499,742 This project establishes new traditions in the chemistry curriculum that optimize opportunities for all students to learn chemical facts and concepts, develop and pursue interests in chemistry and chemistry-related disciplines, and appreciate how an understanding of chemistry is important to life and living. We are changing fundamentally the ways students, faculty, and administrators view their roles, creating a student-centered, active-learning emphasis. We have a broad range of reforms, each of which is developed, tested, modified, thoroughly evaluated, and widely disseminated. We address five main areas that apply to all levels of the curriculum: student-focused active learning; inquiry-based/open-ended laboratories; interdisciplinary course clusters to create learning communities; a topic-oriented curriculum; and information technology/computer tools. Each development in each area is carefully evaluated, and only the best survive. Evaluation provides important information about the process of transfer of innovations among institutions of different types. To insure that our reforms are useful for all students, our consortium includes industry, public and private four-year institutions, minority institutions, and two-year colleges. The project gives special emphasis to students who choose teaching as a career option by main-streaming these students in courses that benefit them in both content and pedagogy. Students, including those in Science Education, are fully integrated into the development and implementation of the project, working on both research topics and evaluation. The project also gives special emphasis to community college students in Advanced Technological Education programs to ensure that they share in using the newly developed curriculum. The students in the ATE program will clearly benefit by being provided the five main areas of thrust that this coalition is developing. All the students emerge with greater comprehension and better retention of chemical knowledge, improved ability to apply chemical concepts to new problems, enhanced appreciation of the relation between chemistry and other disciplines, and skills that enable them to work effectively in multidisciplinary teams.

  19. Notification: Review of Beaches Environmental Assessment and Coastal Health Act (BEACH Act) Grants for Beach Monitoring and Public Notification

    EPA Pesticide Factsheets

    Project #OPE-FY15-0056, July 14, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin research on Office of Water grants for beach monitoring and public notification under the BEACH Act.

  20. Service and Methods Demonstrations Program Summary Report

    DOT National Transportation Integrated Search

    1981-12-01

    This report summarizes the activities and accomplishments of the UMTA Service and Methods Demonstrations Program for FY 1979, 1980, and 1981. Overall program objectives, current activities, and future directions are briefly described. Current demonst...

  1. 2012 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-12-01

    The 2012 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for : Federal Fiscal Year (FY) 2012. The report covers the following programs: Urbanized Area Formula, Non-urbanized A...

  2. 2011 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-05-01

    The 2011 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2011. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...

  3. 2010 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-07-01

    The 2010 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2010. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...

  4. Laboratory Directed Research and Development FY 1998 Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John Vigil; Kyle Wheeler

    This is the FY 1998 Progress Report for the Laboratory Directed Research and Development (LDRD) Program at Los Alamos National Laboratory. It gives an overview of the LDRD Program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principle investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic, molecular, optical, and plasma physics, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less

  5. Laboratory directed research and development: FY 1997 progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil, J.; Prono, J.

    1998-05-01

    This is the FY 1997 Progress Report for the Laboratory Directed Research and Development (LDRD) program at Los Alamos National Laboratory. It gives an overview of the LDRD program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principal investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic and molecular physics and plasmas, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less

  6. Public Expenditures for Mental Health Services in Canadian Provinces: Dépenses publiques pour les services de santé mentale dans les provinces canadiennes.

    PubMed

    Wang, Jian; Jacobs, Philip; Ohinmaa, Arto; Dezetter, Anne; Lesage, Alain

    2018-04-01

    The purpose of this study is to measure provincial spending for mental health services in fiscal year (FY) 2013 and to compare these cost estimates to those of FY 2003. This study estimated the costs of publicly funded provincial mental health services in FY 2013 and compared them to the estimates for FY 2003 from a previously published report. Our data were obtained from publicly accessible databases. The cross-year cost comparisons for provincial mental health services were restricted to general and psychiatric hospital inpatients, clinical payments to physicians and psychologists, and prescribed psychotropic medications. Total public expenditures were inflation adjusted and expressed per capita and as a percentage of the total provincial health spending. Total public spending for mental health and addiction programs/services was estimated to be $6.75 billion for FY 2013. The largest component of the expenditures was hospital inpatient services ($4.02 billion, 59.6%), followed by clinical payments to physicians or psychologists ($1.69 billion, 25%), and then publicly funded prescribed psychotherapeutic medications ($1.04 billion, 15.4%). Nationally, the portion of total public spending on health that was spent on mental health decreased from FY 2003 to FY 2013 from 5.4% to 4.9%. Our results reveal that mental health spending, as a proportion of public health care expenditures, decreased in the decade from FY 2003 to FY 2013. Due to large differences in how the provinces report community mental health services, we still lack a comprehensive picture of the mental health system.

  7. 78 FR 26117 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ...Through this interim final rule, NMFS announces that it partially approves Framework Adjustment 48 to the NE Multispecies Fishery Management Plan (FMP) and implements the approved measures in the regulations. Framework 48 is the first of two parallel and related actions developed by the New England Fishery Management Council (Council) to respond to updated stock status information and to adjust other management measures in the NE multispecies (groundfish) fishery beginning in fishing year (FY) 2013. This action implements new status determination criteria for Gulf of Maine (GOM) cod, Georges Bank (GB) cod, Southern New England/Mid-Atlantic (SNE/MA) yellowtail flounder, and white hake based on new benchmark assessments completed for these stocks in 2012 and 2013. NMFS is approving and implementing updated status determination criteria for white hake through this interim final rule and accepting further comment on this measure since it was not available for comment in the Framework 48 proposed rule. NMFS will publish a subsequent final rule to respond to any comments received, if necessary. Through this action, NMFS has also approved and is implementing the following Framework 48 measures: Elimination of dockside monitoring requirements for the groundfish fishery; lower minimum fish sizes for several groundfish stocks; clarified goals and performance standard for groundfish monitoring programs; revisions to the allocation of GB yellowtail flounder to the scallop fishery; and establishment of sub-annual catch limits (ACLs) of GB yellowtail flounder and SNE/MA windowpane flounder for the scallop and other non- groundfish fisheries. NMFS also approved revisions to recreational and commercial accountability measures (AMs), including amendments to existing AMs for windowpane flounder, ocean pout, and Atlantic halibut, and new ``reactive'' AMs for Atlantic wolffish and SNE/MA winter flounder, to address a remand by the U.S. District Court of Appeals. NMFS disapproved some measures in Framework 48: A provision for cost- sharing of monitoring costs between the industry and NMFS; a provision to delay industry-funded monitoring to FY 2014; finer scale discard rate strata for GB yellowtail flounder; and a provision to remove requirements for groundfish trawlers to stow their gear when transiting closed areas. Through this interim final rule, NMFS also withdraws a proposed correction to the regulations specific to monitoring of the Eastern U.S./Canada quotas, and will be accepting additional public comment on this issue. These measures are necessary to meet the requirements of the FMP and the Magnuson-Stevens Act, most notably preventing overfishing, ensuring that management measures are based on the best available science, and mitigating, to the extent practicable, potential negative economic impacts from reductions in catch limits anticipated for fishing year FY 2013.

  8. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT PROGRAM ANNUAL REPORT TO THE DEPARTMENT OF ENERGY FOR FISCAL YEAR 1999. THE DEPARTMENT OF ENERGY, DECEMBER 1999.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PAUL,P.; FOX,K.J.

    2000-07-01

    In FY 1999, the BNL LDRD Program funded 33 projects, 25 of which were new starts, at a total cost of $4,525,584. A table is presented which lists all of the FY 1999 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which are given. A total of 29 informal publications (abstracts, presentations, reports and workshop papers) were reported and an additional 23 formal (full length) papers were either published, are in press or being prepared for publication.more » The investigators on five projects have filed for patents. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. The complete summary of follow-on activities is as follows: Information Publications--29, Formal Papers--23, Grants/Proposals/Follow-on Funding--7. In conclusion, a significant measure of success is already attributable to the FY 1999 LDRD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less

  9. Idaho National Laboratory Cultural Resource Monitoring Report for Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilbert, Hollie Kae; Holmer, Marie Pilkington; Olson, Christina Liegh

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year (FY) 2016. Overall monitoring included surveillance of the following 23 individual cultural resource localities: two locations with human remains, one of which is also a cave; seven additional caves; six prehistoric archaeological sites; four historic archaeological sites; one historic trail; Experimental Breeder Reactor I (EBR-I), a National Historic Landmark; Aircraft Nuclear Propulsion (ANP) objects located at EBR-I; and one Arco Naval Proving Ground (NPG) property, CF-633 and related objects and structures. Several INL work processes and projects weremore » also monitored to confirm compliance with original INL CRM recommendations and assess the effects of ongoing work. On one occasion, ground disturbing activities within the boundaries of the Critical Infrastructure Test Range Complex (CITRC) were observed by INL CRM staff prepared to respond to any additional finds of Native American human remains. Additionally, the CRM office was notified during two Trespass Investigations conducted by INL Security. Most of the cultural resources monitored in FY 2016 exhibited no adverse impacts, resulting in Type 1 impact assessments. However, Type 2 impacts were noted five times. Three previously reported Type 2 impacts were once again documented at the EBR-I National Historic Landmark, including spalling and deterioration of bricks due to inadequate drainage, minimal maintenance, and rodent infestation. The ANP engines and locomotive on display at the EBR-I Visitors Center also exhibited impacts related to long term exposure. Finally, most of the Arco NPG properties monitored at Central Facilities Area exhibited problems with lack of timely and appropriate maintenance as well as inadequate drainage. No new Type 3 or Type 4 impacts that adversely affected significant cultural resources and threatened National Register eligibility were documented in FY 2016.« less

  10. 200-BP-1 Prototype Hanford Barrier -- 15 Years of Performance Monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ward, Anderson L.; Draper, Kathryn E.; Link, Steven O.

    2011-09-30

    Monitoring is an essential component of engineered barrier system design and operation. A composite capacitive cover, including a capillary break and an evapotranspiration (ET) barrier at the Hanford Site, is generating data that can be used to help resolve these issues. The prototype Hanford barrier was constructed over the 216-B-57 Crib in 1994 to evaluate surface-barrier constructability, construction costs, and physical and hydrologic performance at the field scale. The barrier has been routinely monitored between November 1994 and September 1998 as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance formore » the 200 BP 1 Operable Unit. Since FY 1998, monitoring has focused on a more limited set of key water balance, stability, and biotic parameters. In FY 2009, data collection was focused on: (1) water-balance monitoring, consisting of precipitation, runoff, soil moisture storage, and drainage measurements with evapotranspiration calculated by difference; (2) stability monitoring, consisting of asphalt-layer-settlement, basalt-side-slope-stability, and surface-elevation measurements; (3) vegetation dynamics; and (4) animal use. September 2009 marked 15 years since the start of monitoring and the collection of performance data. This report describes the results of monitoring activities during the period October 1, 2008, through September 30, 2009, and summarizes the 15 years of performance data collected from September 1994 through September 2009.« less

  11. 77 FR 52752 - Notice of FY 2012 Refugee Social Services Formula Awards to States and Wilson/Fish Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... allocations for Social Services are available on ORR's Web site at: http://www.acf.hhs.gov/programs/orr/policy...] Notice of FY 2012 Refugee Social Services Formula Awards to States and Wilson/Fish Alternative Project... allocation of Refugee Social Services formula awards to States and Wilson/Fish Alternative Project grantees...

  12. FY10 Defense Environmental Programs Annual Report to Congress

    DTIC Science & Technology

    2011-07-01

    7,412- 2019  AIR FORCE ALPENA COUNTY REGIONAL AIRPORT / MI557282890300 17 2 $6,363 $0 $862 $1,9462012 2018  FORMERLY USED DEFENSE SITES ASH FIELD...Through FY10 ($000) IRP MMRPMMRPIRP Michigan ALPENA AAF / MI59799F231100 $001 $23 ALPENA NGTR / MI59799F228900 $610 $0 ANN ARBOR NGTR / MI59799F228800

  13. Library Statistics Program: State Library Agency Report for FY 2006

    ERIC Educational Resources Information Center

    Institute of Museum and Library Services, 2007

    2007-01-01

    This report marks the first release of library statistics data from the Institute of Museum and Library Services. It contains data on state library agencies in the 50 states and the District of Columbia for state fiscal year (FY) 2006. The data were collected through the State Library Agencies (StLA) Survey, the product of a cooperative effort…

  14. 78 FR 4838 - Applications for New Awards; Gaining Early Awareness and Readiness for Undergraduate Programs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... Project. Notice inviting applications for new awards for fiscal year (FY) 2013. Catalog of Federal.... Absolute Priorities: For FY 2013 and any subsequent year in which we make awards from the list of unfunded...; that is, all funds needed for grantees to fully implement the project for its five or six year duration...

  15. 78 FR 48233 - Medicare Program; FY 2014 Hospice Wage Index and Payment Rate Update; Hospice Quality Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... Contents I. Executive Summary A. Purpose B. Summary of the Major Provisions C. Summary of Costs, Benefits, and Transfers II. Background A. Hospice Care B. History of the Medicare Hospice Benefit C. Services... IV.C.3. We also update the FY 2014 hospice wage index with more current wage data, and the BNAF will...

  16. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    DTIC Science & Technology

    2008-08-21

    upgrades, and to include several factors (including political, security, social environment, and best ways to engage local populations) in designing...demonstrated a strong commitment to political, economic, and social reforms. The President initially promised $5 billion annually by FY2006...services, including Cantonese , Ukrainian, Tibetan, Portuguese to Africa, Romanian, and Kazakh, as well as broadcasts in Hindi, Russian, English

  17. 76 FR 15991 - HUD's Fiscal Year (FY) 2010 NOFA for the Self-Help Homeownership Opportunity Program (SHOP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-C-34] HUD's Fiscal Year (FY) 2010... nonprofit organizations under federal or state law. This Notice also corrects sections in the NOFA that...Logic Model form HUD 96010 SHOP V12.3 012811. The coding in the form originally posted did not allow the...

  18. The Effects of Military Advertising: Evidence from the Advertising Mix Test

    DTIC Science & Technology

    1989-03-01

    services with monthly infornation on contracts, recruiters, quotas, market characteristics, and advertising expenditures. First, advertising programs...Demographic market data: ADI averages for FY 84 ......................... 25 B.3. DoD advertising mix data: ADI averages, FY 84...data were available with all the requisite goal and advertising information. Detailed information on market demographics were not available, nor were

  19. Genome-wide association study for identifying loci that affect fillet yield, carcass, and body weight traits in rainbow trout (Oncorhynchus mykiss)

    USDA-ARS?s Scientific Manuscript database

    Fillet yield (FY, %) is an economically important trait in rainbow trout aquaculture that affects production efficiency. Despite that, FY has not received much attention in breeding programs because it is difficult to measure on a large number of fish and it cannot be directly measured on breeding c...

  20. 75 FR 4824 - Agency Information Collection Activities; Proposed Collection; Comment Request; State Program Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... reporting year and thereafter, while the current reporting, OMB Approval Number 0985-0008, will be extended to the end of the FY 2010 reporting cycle. The proposed FY 2011 version may be found on the AoA Web site link entitled Draft State Reporting Tool for Review available at http://www.aoa.gov/AoARoot...

Top