Sample records for monitoring program hfmp

  1. Lack of long-term benefits of a 6-month heart failure disease management program.

    PubMed

    Nguyen, Viviane; Ducharme, Anique; White, Michel; Racine, Normand; O'Meara, Eileen; Zhang, Bin; Rouleau, Jean L; Brophy, James

    2007-05-01

    Heart failure (HF) represents a major burden on the health care system, causing repeated hospitalizations and numerous emergency department (ED) visits. In a 6-month randomized study of a multidisciplinary HF clinic, we have previously shown decreased hospital readmissions and improved quality of life. Despite these encouraging results, it is unknown if these beneficial effects are sustained. To assess long-term recurrent ED visits, readmissions, and mortality among HF patients who were discharged after a 6-month intensive HF management program (HFMP). Of the 230 subjects (New York Heart Association Class II-IV) who were initially randomized to standard follow-up care or to a HFMP for 6 months, 190 were studied retrospectively for long-term evaluation. Long-term data was obtained from the Quebec administrative health databases. We compared the intervention and control groups for the number of recurrent ED visits, hospital readmissions, and all-cause deaths. After a mean follow-up of 2.8 +/- 1.7 years, there was no difference in the composite end point of all-cause death, hospital admissions, and ED visits between those patients initially in the HFMP group and the controls. After multivariable adjustment, there was no difference in the composite primary endpoint (HR 1.01, 95% CI: 0.75-1.37) or in the secondary end point of all-cause death alone (HR 1.09, 95%CI:0.69-1.72) between those initially assigned to the HF clinic and those receiving usual care. For severely ill patients, the clinical and resource benefits of a 6-month HFMP are not sustained upon program cessation. Further research into the benefits of long-term HFMP is required.

  2. Isolation of N-linked glycopeptides by hydrazine-functionalized magnetic particles.

    PubMed

    Sun, Shisheng; Yang, Ganglong; Wang, Ting; Wang, Qinzhe; Chen, Chao; Li, Zheng

    2010-04-01

    We introduce a novel combination of magnetic particles with hydrazine chemistry, dubbed as hydrazine-functionalized magnetic particles (HFMP) for isolation of glycopeptides. Four methods have been developed and compared for the production of HFMP by hydrazine modification of the surface of the carboxyl and epoxy-silanized magnetic particles, respectively. The evaluation of the capability and specificity of HFMP as well as the optimization of the coupling condition for capturing of glycoproteins were systematically investigated. The results showed that HFMP prepared by adipic dihydrazide functionalization from carboxyl-silanized magnetic particles (HFCA) displayed the maximum capture capacity and isolated efficiency for glycoprotein. When measured with glycoproteins, the capacity of the HFCA (1 g) for coupling bovine fetuin was 130 +/- 5.3 mg. The capability of this method was also confirmed by successful isolation of all formerly glycosylated peptides from standard glycoproteins and identification of their glycosylation sites, which demonstrated the feasibility of the HFCA as an alternative solid support for isolation of glycoproteins/glycopeptides.

  3. Heavy-flavor parton distributions without heavy-flavor matching prescriptions

    NASA Astrophysics Data System (ADS)

    Bertone, Valerio; Glazov, Alexandre; Mitov, Alexander; Papanastasiou, Andrew S.; Ubiali, Maria

    2018-04-01

    We show that the well-known obstacle for working with the zero-mass variable flavor number scheme, namely, the omission of O(1) mass power corrections close to the conventional heavy flavor matching point (HFMP) μ b = m, can be easily overcome. For this it is sufficient to take advantage of the freedom in choosing the position of the HFMP. We demonstrate that by choosing a sufficiently large HFMP, which could be as large as 10 times the mass of the heavy quark, one can achieve the following improvements: 1) above the HFMP the size of missing power corrections O(m) is restricted by the value of μ b and, therefore, the error associated with their omission can be made negligible; 2) additional prescriptions for the definition of cross-sections are not required; 3) the resummation accuracy is maintained and 4) contrary to the common lore we find that the discontinuity of α s and pdfs across thresholds leads to improved continuity in predictions for observables. We have considered a large set of proton-proton and electron-proton collider processes, many through NNLO QCD, that demonstrate the broad applicability of our proposal.

  4. NASA - easyJet Collaboration on the Human Factors Monitoring Program (HFMP) Study

    NASA Technical Reports Server (NTRS)

    Srivistava, Ashok N.; Barton, Phil

    2012-01-01

    This is the first annual report jointly prepared by NASA and easyJet on the work performed under the agreement to collaborate on a study of the many factors entailed in flight - and cabin-crew fatigue and documenting the decreases in performance associated with fatigue. The objective of this Agreement is to generate reliable, automated procedures that improve understanding of the levels and characteristics of flight - and cabin-crew fatigue factors, both latent and proximate, whose confluence will likely result in unacceptable flight crew performance. This study entails the analyses of numerical and textual data collected during operational flights. NASA and easyJet are both interested in assessing and testing NASA s automated capabilities for extracting operationally significant information from very large, diverse (textual and numerical) databases, much larger than can be handled practically by human experts.

  5. Second Interim Report NASA - easyJet Collaboration on the Human Factors Monitoring Program (HFMP) Study

    NASA Technical Reports Server (NTRS)

    Srivistava, Ashok N.; Barton, Phil

    2012-01-01

    This is the second interim report jointly prepared by NASA and easyJet on the work performed under the agreement to collaborate on a study of the factors entailed in flight and cabin-crew fatigue, and decreases in performance associated with fatigue. The objective of this Agreement is to generate reliable procedures that aid in understanding the levels and characteristics of flight and cabin-crew fatigue factors, both latent and proximate, whose confluence will likely result in unacceptable crew performance. This study entails the analyses of numerical and textual data collected during operational flights. NASA and easyJet are both interested in assessing and testing NASA s automated capabilities for extracting operationally significant information from very large, diverse (textual and numerical) databases; much larger than can be handled practically by human experts.

  6. Self-etching ceramic primer versus hydrofluoric acid etching: Etching efficacy and bonding performance.

    PubMed

    El-Damanhoury, Hatem M; Gaintantzopoulou, Maria D

    2018-01-01

    This study assessed the effect of pretreatment of hybrid and glass ceramics using a self-etching primer on the shear bond strength (SBS) and surface topography, in comparison to pretreatment with hydrofluoric acid and silane. 40 rectangular discs from each ceramic material (IPS e.max CAD;EM, Vita Mark II;VM, Vita Enamic;VE), were equally divided (n=10) and assigned to one of four surface pretreatment methods; etching with 4.8% hydrofluoric acid followed by Monobond plus (HFMP), Monobond etch & prime (Ivoclar Vivadent) (MEP), No treatment (NT) as negative control and Monobond plus (Ivoclar Vivadent) with no etching (MP) as positive control. SBS of resin cement (Multilink-N, Ivoclar Vivadent) to ceramic surfaces was tested following a standard protocol. Surface roughness was evaluated using an Atomic force microscope (AFM). Surface topography and elemental analysis were analyzed using SEM/EDX. Data were analyzed with two-way analysis of variance (ANOVA) and post-hoc Bonferroni test at a significance level of α=0.05. Pretreatment with HFMP resulted in higher SBS and increased surface roughness in comparison to MEP and MP. Regardless the method of surface pretreatment, the mean SBS values of EM ceramic was significantly higher (p<0.05) than those recorded for VM and VE, except when VE was treated with MEP, where the difference was statistically insignificant. Traces of fluoride ion were detected when MEP was used with VE and VM. Under limited conditions, using MEP resulted in comparable SBS results to HFMP; meanwhile HFMP remains the gold standard for pretreatment of glass ceramics for resin-luting cementation. Copyright © 2017 Japan Prosthodontic Society. Published by Elsevier Ltd. All rights reserved.

  7. First Annual Report: NASA-ONERA Collaboration on Human Factors in Aviation Accidents and Incidents

    NASA Technical Reports Server (NTRS)

    Srivastava, Ashok; Fabiani, Patrick

    2012-01-01

    This is the first annual report jointly prepared by NASA and ONERA on the work performed under the agreement to collaborate on a study of the human factors entailed in aviation accidents and incidents particularly focused on consequences of decreases in human performance associated with fatigue. The objective of this Agreement is to generate reliable, automated procedures that improve understanding of the levels and characteristics of flight-crew fatigue factors whose confluence will likely result in unacceptable crew performance. This study entails the analyses of numerical and textual data collected during operational flights. NASA and ONERA are collaborating on the development and assessment of automated capabilities for extracting operationally significant information from very large, diverse (textual and numerical) databases much larger than can be handled practically by human experts. This report presents the approach that is currently expected to be used in processing and analyzing the data for identifying decrements in aircraft performance and examining their relationships to decrements in crewmember performance due to fatigue. The decisions on the approach were based on samples of both the numerical and textual data that will be collected during the four studies planned under the Human Factors Monitoring Program (HFMP). Results of preliminary analyses of these sample data are presented in this report.

  8. Consumption of mixed fruit-juice drink and vitamin C reduces postprandial stress induced by a high fat meal in healthy overweight subjects.

    PubMed

    Peluso, Ilaria; Villano, Debora V; Roberts, Susan A; Cesqui, Eleonora; Raguzzini, Anna; Borges, Gina; Crozier, Alan; Catasta, Giovina; Toti, Elisabetta; Serafini, Mauro

    2014-01-01

    Postprandial stress induced by acute consumption of meals with a high fat content results in an increase of markers of cardiometabolic risk. Repeated acute dietary stress may induce a persistent low-grade inflammation, playing a role in the pathogenesis of functional gut diseases. This may cause an impairment of the complex immune response of the gastrointestinal mucosa, which results in a breakdown of oral tolerance. We investigated the effect of ingestion of a fruit-juice drink (FJD) composed by multiple fruit juice and extracts, green tea extracts and vitamin C on postprandial stress induced by a High Fat Meal (HFM) in healthy overweight subjects. Following a double blind, placebo controlled, cross-over design, 15 healthy overweight subjects were randomized to a HFM providing 1334 Kcal (55% fat, 30% carbohydrates and 15% proteins) in combination with 500 mL of a placebo drink (HFM-P) or a fruit-juice drink (HFM-FJD). Ingestion of HFM-P led to an increase in circulating levels of cholesterol, triglycerides, glucose, insulin, TNF-α and IL-6. Ingestion of HFM-FJD significantly reduced plasma levels of cholesterol and triglycerides, decreasing inflammatory response mediated by TNF-α and IL-6. Ingestion of a fruit-juice drink reduce markers of postprandial stress induced by a HFM.

  9. Heterogeneity of heart failure management programs in Australia.

    PubMed

    Driscoll, Andrea; Worrall-Carter, Linda; McLennan, Skye; Dawson, Anna; O'Reilly, Jan; Stewart, Simon

    2006-03-01

    Heart Failure Management Programs (HFMPs) have proven to be cost-effective in minimising recurrent hospitalisations, morbidity and mortality. However, variability between the programs exists which could translate into variable health outcomes. To survey the characteristics of HFMPs throughout Australia and to identify potential heterogeneity in their organisation and structure. Thirty-nine post-discharge HFMPs were identified from a systematic search of the Australian health-care system in 2002. A comprehensive 19-item questionnaire specifically examining characteristics of HFMPs was sent to co-ordinators of identified programs in early 2003. All participants responded with six institutions (15%) indicating that their HFMP had ceased operations due to a lack of funding. The survey revealed an uneven distribution of the 33 active HFMPs operating throughout Australia. Overall, 4450 post-discharge HF patients (median: 74; IQR: 24-147) were managed via these programs, representing only 11% of the potential caseload for an Australia-wide network of HFMPs. Heterogeneity of these programs existed in respect to the model of care applied within the program (70% applied a home-based program and 18% a specialist HF clinic) and applied interventions (30% of programs had no discharge criteria and 45% of programs prevented nurses administering/titrating medications). Sustained funding was available to only 52% of the active HFMPs. Inequity of access to HFMPs in Australia is evident in relation to locality and high service demand, further complicated by inadequate funding. Heterogeneity between these programs is substantial. The development of national benchmarks for evidence-based HFMPs is required to address program variability and funding issues to realise their potential to improve health outcomes.

  10. First-principles anharmonic quantum calculations for peptide spectroscopy: VSCF calculations and comparison with experiments.

    PubMed

    Roy, Tapta Kanchan; Sharma, Rahul; Gerber, R Benny

    2016-01-21

    First-principles quantum calculations for anharmonic vibrational spectroscopy of three protected dipeptides are carried out and compared with experimental data. Using hybrid HF/MP2 potentials, the Vibrational Self-Consistent Field with Second-Order Perturbation Correction (VSCF-PT2) algorithm is used to compute the spectra without any ad hoc scaling or fitting. All of the vibrational modes (135 for the largest system) are treated quantum mechanically and anharmonically using full pair-wise coupling potentials to represent the interaction between different modes. In the hybrid potential scheme the MP2 method is used for the harmonic part of the potential and a modified HF method is used for the anharmonic part. The overall agreement between computed spectra and experiment is very good and reveals different signatures for different conformers. This study shows that first-principles spectroscopic calculations of good accuracy are possible for dipeptides hence it opens possibilities for determination of dipeptide conformer structures by comparison of spectroscopic calculations with experiment.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael E. McIlwain; Nick Thompson; Da Gao

    Considerable interest is given to the excellent scintillation properties of cerium doped lanthanum chloride (LaCl3) and lanthanum bromide (LaBr3). The scintillation efficiencies are much greater than other materials, even those containing cerium. This high efficiency is attributed to the high mobility of electrons and holes, unique placement of the cerium 5d states within the band gap, and energy of the band gap. To better understand the scintillation process and better define the nature of the Self Trapped Exciton (STE) within these unique scintillation materials, density functional theory (DFT), and Ab-inito (HF-MP2) calculations are reported. DFT calculations have yielded a qualitativemore » description of the orbital composition and energy distribution of the band structure in the crystalline material. MP2 and single configuration interaction calculations have provided quantitative values for the band gap and provided energies for the possible range of excited states created following hole and electron creation. Based on this theoretical treatment, one possible description of the STE is the combination of Vk center (Br2-1) and LaBr+1 species that recombine to form a distorted geometry LaBr3* (triplet state). Depending on the distance between the LaBr and Br2, the STE emission band can be reproduced.« less

  12. Psychosocial Correlates of Clinicians' Prescription Drug Monitoring Program Utilization.

    PubMed

    Pugliese, John A; Wintemute, Garen J; Henry, Stephen G

    2018-05-01

    The purpose of this study is to extend prior research on barriers to use of a prescription drug monitoring program by examining psychosocial correlates of intended use among physicians and pharmacists. Overall, 1,904 California physicians and pharmacists responded to a statewide survey (24.1% response rate) from August 2016 to January 2017. Participants completed an online survey examining attitudes toward prescription drug misuse and abuse, prescribing practices, prescription drug monitoring program design and ease of use, professional obligations, and normative beliefs regarding prescription drug monitoring program use. Data were analyzed in 2017. Perceived prescription drug monitoring program usefulness and normative beliefs fully mediated the relationship between concern about prescription drug abuse and intentions to use the prescription drug monitoring program. Clinicians' sense of professional and moral obligation to use the prescription drug monitoring program was unrelated to intention to use the prescription drug monitoring program despite a positive relationship with concern about misuse and abuse. Compared with physicians, pharmacists reported greater concern about prescription drug misuse, greater professional and moral obligation to use prescription drug monitoring program, and greater rating of prescription drug monitoring program usefulness. Interventions that target normative beliefs surrounding prescription drug monitoring program use and how to use prescription drug monitoring programs effectively are likely to be more effective than those that target professional obligations or moralize to the medical community. Published by Elsevier Inc.

  13. Development of GUI Type On-Line Condition Monitoring Program for a Turboprop Engine Using Labview

    NASA Astrophysics Data System (ADS)

    Kong, Changduk; Kim, Keonwoo

    2011-12-01

    Recently, an aero gas turbine health monitoring system has been developed for precaution and maintenance action against faults or performance degradations of the advanced propulsion system which occurs in severe environments such as high altitude, foreign object damage particles, hot and heavy rain and snowy atmospheric conditions. However to establish this health monitoring system, the online condition monitoring program is firstly required, and the program must monitor the engine performance trend through comparison between measured engine performance data and base performance results calculated by base engine performance model. This work aims to develop a GUI type on-line condition monitoring program for the PT6A-67 turboprop engine of a high altitude and long endurance operation UAV using LabVIEW. The base engine performance of the on-line condition monitoring program is simulated using component maps inversely generated from the limited performance deck data provided by engine manufacturer. The base engine performance simulation program is evaluated because analysis results by this program agree well with the performance deck data. The proposed on-line condition program can monitor the real engine performance as well as the trend through precise comparison between clean engine performance results calculated by the base performance simulation program and measured engine performance signals. In the development phase of this monitoring system, a signal generation module is proposed to evaluate the proposed online monitoring system. For user friendly purpose, all monitoring program are coded by LabVIEW, and monitoring examples are demonstrated using the proposed GUI type on-condition monitoring program.

  14. Volunteer water monitoring: A guide for state managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-08-01

    Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.

  15. 40 CFR 264.99 - Compliance monitoring program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be based on a compliance monitoring program developed to meet the requirements of this section. (i... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Compliance monitoring program. 264.99... Releases From Solid Waste Management Units § 264.99 Compliance monitoring program. An owner or operator...

  16. Understanding Program Monitoring: The Relationships among Outcomes, Indicators, Measures, and Targets. REL 2014-011

    ERIC Educational Resources Information Center

    Malone, Nolan; Mark, Lauren; Narayan, Krishna

    2014-01-01

    This guide offers educators, program managers, administrators, and researchers a resource for building capacity for monitoring program outcomes. It provides concise definitions of program monitoring components and a framework for assessing program progress. Examples demonstrate the relationships among program components: outcomes, indicators,…

  17. Establishing a national biological laboratory safety and security monitoring program.

    PubMed

    Blaine, James W

    2012-12-01

    The growing concern over the potential use of biological agents as weapons and the continuing work of the Biological Weapons Convention has promoted an interest in establishing national biological laboratory biosafety and biosecurity monitoring programs. The challenges and issues that should be considered by governments, or organizations, embarking on the creation of a biological laboratory biosafety and biosecurity monitoring program are discussed in this article. The discussion focuses on the following questions: Is there critical infrastructure support available? What should be the program focus? Who should be monitored? Who should do the monitoring? How extensive should the monitoring be? What standards and requirements should be used? What are the consequences if a laboratory does not meet the requirements or is not willing to comply? Would the program achieve the results intended? What are the program costs? The success of a monitoring program can depend on how the government, or organization, responds to these questions.

  18. 40 CFR 122.48 - Requirements for recording and reporting of monitoring results (applicable to State programs, see...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results (applicable to State programs, see § 123.25). 122.48 Section 122.48... recording and reporting of monitoring results (applicable to State programs, see § 123.25). All permits...

  19. 40 CFR 122.48 - Requirements for recording and reporting of monitoring results (applicable to State programs, see...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results (applicable to State programs, see § 123.25). 122.48 Section 122.48... recording and reporting of monitoring results (applicable to State programs, see § 123.25). All permits...

  20. 40 CFR 122.48 - Requirements for recording and reporting of monitoring results (applicable to State programs, see...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results (applicable to State programs, see § 123.25). 122.48 Section 122.48... recording and reporting of monitoring results (applicable to State programs, see § 123.25). All permits...

  1. 40 CFR 122.48 - Requirements for recording and reporting of monitoring results (applicable to State programs, see...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results (applicable to State programs, see § 123.25). 122.48 Section 122.48... recording and reporting of monitoring results (applicable to State programs, see § 123.25). All permits...

  2. 40 CFR 122.48 - Requirements for recording and reporting of monitoring results (applicable to State programs, see...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results (applicable to State programs, see § 123.25). 122.48 Section 122.48... recording and reporting of monitoring results (applicable to State programs, see § 123.25). All permits...

  3. A comparison of the temporally integrated monitoring of ecosystems and Adirondack Long Term-Monitoring programs in the Adirondack Mountain region of New Yrok

    EPA Science Inventory

    This paper compares lake chemistry in the Adirondack region of New York measured by the Temporally Integrated Monitoring of Ecosystems (TIME) and Adirondack Long-Term Monitoring (ALTM) programs by examining the data from six lakes common to both programs. Both programs were initi...

  4. Cost considerations for long-term ecological monitoring

    USGS Publications Warehouse

    Caughlan, L.; Oakley, K.L.

    2001-01-01

    For an ecological monitoring program to be successful over the long-term, the perceived benefits of the information must justify the cost. Financial limitations will always restrict the scope of a monitoring program, hence the program's focus must be carefully prioritized. Clearly identifying the costs and benefits of a program will assist in this prioritization process, but this is easier said than done. Frequently, the true costs of monitoring are not recognized and are, therefore, underestimated. Benefits are rarely evaluated, because they are difficult to quantify. The intent of this review is to assist the designers and managers of long-term ecological monitoring programs by providing a general framework for building and operating a cost-effective program. Previous considerations of monitoring costs have focused on sampling design optimization. We present cost considerations of monitoring in a broader context. We explore monitoring costs, including both budgetary costs--what dollars are spent on--and economic costs, which include opportunity costs. Often, the largest portion of a monitoring program budget is spent on data collection, and other, critical aspects of the program, such as scientific oversight, training, data management, quality assurance, and reporting, are neglected. Recognizing and budgeting for all program costs is therefore a key factor in a program's longevity. The close relationship between statistical issues and cost is discussed, highlighting the importance of sampling design, replication and power, and comparing the costs of alternative designs through pilot studies and simulation modeling. A monitoring program development process that includes explicit checkpoints for considering costs is presented. The first checkpoint occur during the setting of objectives and during sampling design optimization. The last checkpoint occurs once the basic shape of the program is known, and the costs and benefits, or alternatively the cost-effectiveness, of each program element can be evaluated. Moving into the implementation phase without careful evaluation of costs and benefits is risky because if costs are later found to exceed benefits, the program will fail. The costs of development, which can be quite high, will have been largely wasted. Realistic expectations of costs and benefits will help ensure that monitoring programs survive the early, turbulent stages of development and the challenges posed by fluctuating budgets during implementation.

  5. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  6. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  7. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  8. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  9. 7 CFR 246.19 - Management evaluation and monitoring reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...

  10. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  11. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  12. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  13. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  14. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  15. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  16. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  17. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  18. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  19. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  20. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  1. Review of present groundwater monitoring programs at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hershey, R.L.; Gillespie, D.

    1993-09-01

    Groundwater monitoring at the Nevada Test Site (NTS) is conducted to detect the presence of radionuclides produced by underground nuclear testing and to verify the quality and safety of groundwater supplies as required by the State of Nevada and federal regulations, and by U.S. Department of Energy (DOE) Orders. Groundwater is monitored at water-supply wells and at other boreholes and wells not specifically designed or located for traditional groundwater monitoring objectives. Different groundwater monitoring programs at the NTS are conducted by several DOE Nevada Operations Office (DOE/NV) contractors. Presently, these individual groundwater monitoring programs have not been assessed or administeredmore » under a comprehensive planning approach. Redundancy exists among the programs in both the sampling locations and the constituents analyzed. Also, sampling for certain radionuclides is conducted more frequently than required. The purpose of this report is to review the existing NTS groundwater monitoring programs and make recommendations for modifying the programs so a coordinated, streamlined, and comprehensive monitoring effort may be achieved by DOE/NV. This review will be accomplished in several steps. These include: summarizing the present knowledge of the hydrogeology of the NTS and the potential radionuclide source areas for groundwater contamination; reviewing the existing groundwater monitoring programs at the NTS; examining the rationale for monitoring and the constituents analyzed; reviewing the analytical methods used to quantify tritium activity; discussing monitoring network design criteria; and synthesizing the information presented and making recommendations based on the synthesis. This scope of work was requested by the DOE/NV Hydrologic Resources Management Program (HRMP) and satisfies the 1993 (fiscal year) HRMP Groundwater Monitoring Program Review task.« less

  2. Inter-observer agreement of a multi-parameter campsite monitoring program on the Dixie National Forest, Utah

    Treesearch

    Nicholas J. Glidden; Martha E. Lee

    2007-01-01

    Precision is crucial to campsite monitoring programs. Yet, little empirical research has ever been published on the level of precision of this type of monitoring programs. The purpose of this study was to evaluate the level of agreement between observers of campsite impacts using a multi-parameter campsite monitoring program. Thirteen trained observers assessed 16...

  3. An overview of a landbird monitoring program at Tortuguero, on the Caribbean coast of Costa Rica

    Treesearch

    C. John Ralph; Margaret J. Widdowson; Robert I. Frey; Pablo A. Herrera; Brian P. O' Donnell

    2005-01-01

    Since 1994, the Tortuguero Integrated Bird Monitoring Program has been monitoring birds in a coastal lowland rain forest of northeast Costa Rica. The Program has combined the use of area searches, constanteffort mist netting, and migration counts into a longterm landbird monitoring and training program following the recommendations of the Partners In Flight &ndash...

  4. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  5. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  6. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  7. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  8. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  9. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  10. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  11. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  12. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  13. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  14. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  15. 14 CFR § 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  16. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  17. Central Alaska Network vital signs monitoring plan

    USGS Publications Warehouse

    MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug

    2005-01-01

    Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.

  18. 24 CFR 266.520 - Program monitoring and compliance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  19. 24 CFR 266.520 - Program monitoring and compliance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  20. 24 CFR 266.520 - Program monitoring and compliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  1. 24 CFR 266.520 - Program monitoring and compliance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  2. 24 CFR 266.520 - Program monitoring and compliance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  3. The role of population monitoring in the management of North American waterfowl

    USGS Publications Warehouse

    Nichols, J.D.; Williams, B.K.; Johnson, F.A.

    2000-01-01

    Despite the effort and expense devoted to large-scale monitoring programs, few existing programs have been designed with specific objectives in mind and few permit strong inferences about the dynamics of monitored systems. The waterfowl population monitoring programs of the U.S. Fish and Wildlife Service, Canadian Wildlife Service and state and provincial agencies provide a nice example with respect to program objectives, design and implementation. The May Breeding Grounds Survey provides an estimate of system state (population size) that serves two primary purposes in the adaptive management process: identifying the appropriate time-specific management actions and updating the information state (model weights) by providing a basis for evaluating predictions of competing models. Other waterfowl monitoring programs (e.g., banding program, hunter questionnaire survey, parts collection survey, winter survey) provide estimates of vital rates (rates of survival, reproduction and movement) associated with system dynamics and variables associated with management objectives (e.g., harvest). The reliability of estimates resulting from monitoring programs depends strongly on whether considerations about spatial variation and detection probability have been adequately incorporated into program design and implementation. Certain waterfowl surveys again provide nice examples of monitoring programs that incorporate these considerations.

  4. Ecological Monitoring and Compliance Program 2011 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, D. J.; Anderson, D. C.; Hall, D. B.

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada National Security Site and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program's activities conducted by National Security Technologies, LLC, during calendar year 2011. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex. Duringmore » 2011, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  5. The future role of next-generation DNA sequencing and metagenetics in aquatic biology monitoring programs

    EPA Science Inventory

    The development of current biological monitoring and bioassessment programs was a drastic improvement over previous programs created for monitoring a limited number of specific chemical pollutants. Although these assessment programs are better designed to address the transient an...

  6. 34 CFR 303.501 - Supervision and monitoring of programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... supervision of programs and activities receiving assistance under this part; and (2) The monitoring of... 34 Education 2 2011-07-01 2010-07-01 true Supervision and monitoring of programs. 303.501 Section... INFANTS AND TODDLERS WITH DISABILITIES State Administration General § 303.501 Supervision and monitoring...

  7. 34 CFR 303.501 - Supervision and monitoring of programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... supervision of programs and activities receiving assistance under this part; and (2) The monitoring of... 34 Education 2 2010-07-01 2010-07-01 false Supervision and monitoring of programs. 303.501 Section... INFANTS AND TODDLERS WITH DISABILITIES State Administration General § 303.501 Supervision and monitoring...

  8. A western state perspective on monitoring and managing neotropical migratory birds

    Treesearch

    Frank Howe

    1993-01-01

    Neotropical migratory bird monitoring programs can contribute greatly to a more holistic and proactive management approach for state agencies. It is, however, imperative that these monitoring programs be scientifically designed and clearly communicated to managers. Information from monitoring programs can be used to develop multiple-species habitat management...

  9. 10 CFR 26.406 - Fitness monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Fitness monitoring. 26.406 Section 26.406 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS FFD Program for Construction § 26.406 Fitness monitoring. (a...) Licensees and other entities shall implement a fitness monitoring program to deter substance abuse and...

  10. 10 CFR 26.406 - Fitness monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Fitness monitoring. 26.406 Section 26.406 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS FFD Program for Construction § 26.406 Fitness monitoring. (a...) Licensees and other entities shall implement a fitness monitoring program to deter substance abuse and...

  11. 10 CFR 26.406 - Fitness monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Fitness monitoring. 26.406 Section 26.406 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS FFD Program for Construction § 26.406 Fitness monitoring. (a...) Licensees and other entities shall implement a fitness monitoring program to deter substance abuse and...

  12. 10 CFR 26.406 - Fitness monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Fitness monitoring. 26.406 Section 26.406 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS FFD Program for Construction § 26.406 Fitness monitoring. (a...) Licensees and other entities shall implement a fitness monitoring program to deter substance abuse and...

  13. 10 CFR 26.406 - Fitness monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Fitness monitoring. 26.406 Section 26.406 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS FFD Program for Construction § 26.406 Fitness monitoring. (a...) Licensees and other entities shall implement a fitness monitoring program to deter substance abuse and...

  14. Nonnative Fishes in the Upper Mississippi River System

    USGS Publications Warehouse

    Irons, Kevin S.; DeLain, Steven A.; Gittinger, Eric; Ickes, Brian S.; Kolar, Cindy S.; Ostendort, David; Ratcliff, Eric N.; Benson, Amy J.; Irons, Kevin S.

    2009-01-01

    The introduction, spread, and establishment of nonnative species is widely regarded as a leading threat to aquatic biodiversity and consequently is ranked among the most serious environmental problems facing the United States today. This report presents information on nonnative fish species observed by the Long Term Resource Monitoring Program on the Upper Mississippi River System a nexus of North American freshwater fish diversity for the Nation. The Long Term Resource Monitoring Program, as part of the U.S. Army Corps of Engineers' Environmental Management Plan, is the Nation's largest river monitoring program and stands as the primary source of standardized ecological information on the Upper Mississippi River System. The Long Term Resource Monitoring Program has been monitoring fish communities in six study areas on the Upper Mississippi River System since 1989. During this period, more than 3.5 million individual fish, consisting of 139 species, have been collected. Although fish monitoring activities of the Long Term Resource Monitoring Program focus principally on entire fish communities, data collected by the Program are useful for detecting and monitoring the establishment and spread of nonnative fish species within the Upper Mississippi River System Basin. Sixteen taxa of nonnative fishes, or hybrids thereof, have been observed by the Long Term Resource Monitoring Program since 1989, and several species are presently expanding their distribution and increasing in abundance. For example, in one of the six study areas monitored by the Long Term Resource Monitoring Program, the number of established nonnative species has increased from two to eight species in less than 10 years. Furthermore, contributions of those eight species can account for up to 60 percent of the total annual catch and greater than 80 percent of the observed biomass. These observations are critical because the Upper Mississippi River System stands as a nationally significant pathway for nonnative species expansion between the Mississippi River and the Great Lakes Basin. This report presents a synthesis of data on nonnative fish species observed during Long Term Resource Monitoring Program monitoring activities.

  15. Estuarine monitoring programs in the Albemarle Sound study area, North Carolina

    USGS Publications Warehouse

    Moorman, Michelle; Kolb, Katharine R.; Supak, Stacy

    2014-01-01

    The purpose of this report is to identify major natural resource management issues for the region, provide information on current monitoring activities occurring within the Albemarle Sound study area, determine how the current monitoring network fits into the design of the NMN, and determine what additional monitoring data are needed to address these issues. In order to address these questions, a shapefile and data table were created to document monitoring and research programs in the Albemarle Sound study area with an emphasis on current monitoring programs within the region. This database was queried to determine monitoring gaps that existed in the Albemarle Sound by comparing current monitoring programs with the design indicated by the NMN. The report uses this information to provide recommendations on how monitoring could be improved in the Albemarle Sound study area.

  16. Generic command interpreter for robot controllers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Werner, J.

    1991-04-09

    Generic command interpreter programs have been written for robot controllers at Sandia National Laboratories (SNL). Each interpreter program resides on a robot controller and interfaces the controller with a supervisory program on another (host) computer. We call these interpreter programs monitors because they wait, monitoring a communication line, for commands from the supervisory program. These monitors are designed to interface with the object-oriented software structure of the supervisory programs. The functions of the monitor programs are written in each robot controller's native language but reflect the object-oriented functions of the supervisory programs. These functions and other specifics of the monitormore » programs written for three different robots at SNL will be discussed. 4 refs., 4 figs.« less

  17. Program Monitoring Practices for Teachers of the Deaf and Hard of Hearing in Early Intervention

    ERIC Educational Resources Information Center

    Thomas, Anne E.; Marvin, Christine A.

    2016-01-01

    Program monitoring is an important and necessary assessment practice within the field of early childhood deaf education. Effective program monitoring requires a focus on both the consistent implementation of intervention strategies (fidelity) and the assessment of children's ongoing progress in response to interventions (progress monitoring).…

  18. NCCN Mountain Lakes Monitoring Strategy: Guidelines to Resolution

    USGS Publications Warehouse

    Hoffman, Robert L.; Huff, Mark H.

    2008-01-01

    The North Coast and Cascades Network (NCCN) Inventory and Monitoring Program provides funds to its Network Parks to plan and implement the goals and objectives of the National Park Services? (NPS) Inventory and Monitoring (I&M) Program. The primary purpose of the I&M program is to develop and implement a long-term monitoring program in each network. The purpose of this document is to describe the outcome of a meeting held to find solutions to obstacles inhibiting development of a unified core design and methodology for mountain lake monitoring.

  19. Long-term fish monitoring in large rivers: Utility of “benchmarking” across basins

    USGS Publications Warehouse

    Ward, David L.; Casper, Andrew F.; Counihan, Timothy D.; Bayer, Jennifer M.; Waite, Ian R.; Kosovich, John J.; Chapman, Colin; Irwin, Elise R.; Sauer, Jennifer S.; Ickes, Brian; McKerrow, Alexa

    2017-01-01

    In business, benchmarking is a widely used practice of comparing your own business processes to those of other comparable companies and incorporating identified best practices to improve performance. Biologists and resource managers designing and conducting monitoring programs for fish in large river systems tend to focus on single river basins or segments of large rivers, missing opportunities to learn from those conducting fish monitoring in other rivers. We briefly examine five long-term fish monitoring programs in large rivers in the United States (Colorado, Columbia, Mississippi, Illinois, and Tallapoosa rivers) and identify opportunities for learning across programs by detailing best monitoring practices and why these practices were chosen. Although monitoring objectives, methods, and program maturity differ between each river system, examples from these five case studies illustrate the important role that long-term monitoring programs play in interpreting temporal and spatial shifts in fish populations for both established objectives and newly emerging questions. We suggest that deliberate efforts to develop a broader collaborative network through benchmarking will facilitate sharing of ideas and development of more effective monitoring programs.

  20. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and themore » environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends.« less

  1. Ecological Monitoring and Compliance Program 2007 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Dennis; Anderson, David; Derek, Hall

    2008-03-01

    In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate themore » potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.« less

  2. A novel and cost-effective monitoring approach for outcomes in an Australian biodiversity conservation incentive program.

    PubMed

    Lindenmayer, David B; Zammit, Charles; Attwood, Simon J; Burns, Emma; Shepherd, Claire L; Kay, Geoff; Wood, Jeff

    2012-01-01

    We report on the design and implementation of ecological monitoring for an Australian biodiversity conservation incentive scheme - the Environmental Stewardship Program. The Program uses competitive auctions to contract individual land managers for up to 15 years to conserve matters of National Environmental Significance (with an initial priority on nationally threatened ecological communities). The ecological monitoring was explicitly aligned with the Program's policy objective and desired outcomes and was applied to the Program's initial Project which targeted the critically endangered White Box-Yellow Box-Blakely's Red Gum Grassy Woodland and Derived Native Grassland ecological community in south eastern Australia. These woodlands have been reduced to <3% of their original extent and persist mostly as small remnants of variable condition on private farmland. We established monitoring sites on 153 farms located over 172,232 sq km. On each farm we established a monitoring site within the woodland patch funded for management and, wherever possible, a matched control site. The monitoring has entailed gathering data on vegetation condition, reptiles and birds. We also gathered data on the costs of experimental design, site establishment, field survey, and data analysis. The costs of monitoring are approximately 8.5% of the Program's investment in the first four years and hence are in broad accord with the general rule of thumb that 5-10% of a program's funding should be invested in monitoring. Once initial monitoring and site benchmarking are completed we propose to implement a novel rotating sampling approach that will maintain scientific integrity while achieving an annual cost-efficiency of up to 23%. We discuss useful lessons relevant to other monitoring programs where there is a need to provide managers with reliable early evidence of program effectiveness and to demonstrate opportunities for cost-efficiencies.

  3. Design and operation of internal dosimetry programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaBone, T.R.

    1991-01-01

    The proposed revision to USNRC 10 CFR 20 and the USDOE Order 5480.11 require intakes of radioactive material to be evaluated. Radiation dose limits are based on the sum of effective dose equivalent from intakes and the whole body dose from external sources. These significant changes in the regulations will require, at a minimum, a complete review of personnel monitoring programs to determine their adequacy. In this session we will review a systematic method of designing a routine personnel monitoring program that will comply with the requirements of the new regulations. Specific questions discussed are: (a) What are the goalsmore » and objectives of a routine personnel monitoring program (b) When is a routine personnel monitoring program required (c) What are the required capabilities of the routine personnel monitoring program (d) What should be done with the information generated in a personnel monitoring program Specific recommendations and interpretations are given in the session. 5 refs., 3 figs., 33 tabs.« less

  4. 1993 Annual Report: San Francisco estuary regional monitoring program for trace substances

    USGS Publications Warehouse

    Thompson, B.; Lacy, Jessica; Hardin, Dane; Grovhaug, Tom; Taberski, K.; Jassby, Alan D.; Cloern, James E.; Caffrey, J.; Cole, B.; Schoellhamer, David H.

    1993-01-01

    Summaries of other monitoring activities pertinent to regional monitoring are also included in the Report: a description of the Regional Board’s Bay Protection Studies, the Sacramento Coordinated Monitoring Program, and a wetlands monitoring plan are included.

  5. Cost considerations for long-term ecological monitoring

    USGS Publications Warehouse

    Caughlan, L.; Oakley, K.L.

    2001-01-01

    For an ecological monitoring program to be successful over the long-term, the perceived benefits of the information must justify the cost. Financial limitations will always restrict the scope of a monitoring program, hence the program’s focus must be carefully prioritized. Clearly identifying the costs and benefits of a program will assist in this prioritization process, but this is easier said than done. Frequently, the true costs of monitoring are not recognized and are, therefore, underestimated. Benefits are rarely evaluated, because they are difficult to quantify. The intent of this review is to assist the designers and managers of long-term ecological monitoring programs by providing a general framework for building and operating a cost-effective program. Previous considerations of monitoring costs have focused on sampling design optimization. We present cost considerations of monitoring in a broader context. We explore monitoring costs, including both budgetary costs, what dollars are spent on, and economic costs, which include opportunity costs. Often, the largest portion of a monitoring program budget is spent on data collection, and other, critical aspects of the program, such as scientific oversight, training, data management, quality assurance, and reporting, are neglected. Recognizing and budgeting for all program costs is therefore a key factor in a program’s longevity. The close relationship between statistical issues and cost is discussed, highlighting the importance of sampling design, replication and power, and comparing the costs of alternative designs through pilot studies and simulation modeling. A monitoring program development process that includes explicit checkpoints for considering costs is presented. The first checkpoint occurs during the setting of objectives and during sampling design optimization. The last checkpoint occurs once the basic shape of the program is known, and the costs and benefits, or alternatively the cost-effectiveness, of each program element can be evaluated. Moving into the implementation phase without careful evaluation of costs and benefits is risky because if costs are later found to exceed benefits, the program will fail. The costs of development, which can be quite high, will have been largely wasted. Realistic expectations of costs and benefits will help ensure that monitoring programs survive the early, turbulent stages of development and the challenges posed by fluctuating budgets during implementation.

  6. A framework for evaluating and designing citizen science programs for natural resources monitoring.

    PubMed

    Chase, Sarah K; Levine, Arielle

    2016-06-01

    We present a framework of resource characteristics critical to the design and assessment of citizen science programs that monitor natural resources. To develop the framework we reviewed 52 citizen science programs that monitored a wide range of resources and provided insights into what resource characteristics are most conducive to developing citizen science programs and how resource characteristics may constrain the use or growth of these programs. We focused on 4 types of resource characteristics: biophysical and geographical, management and monitoring, public awareness and knowledge, and social and cultural characteristics. We applied the framework to 2 programs, the Tucson (U.S.A.) Bird Count and the Maui (U.S.A.) Great Whale Count. We found that resource characteristics such as accessibility, diverse institutional involvement in resource management, and social or cultural importance of the resource affected program endurance and success. However, the relative influence of each characteristic was in turn affected by goals of the citizen science programs. Although the goals of public engagement and education sometimes complimented the goal of collecting reliable data, in many cases trade-offs must be made between these 2 goals. Program goals and priorities ultimately dictate the design of citizen science programs, but for a program to endure and successfully meet its goals, program managers must consider the diverse ways that the nature of the resource being monitored influences public participation in monitoring. © 2016 Society for Conservation Biology.

  7. Regional Environmental Monitoring and Assessment Program Data (REMAP)

    EPA Pesticide Factsheets

    The Regional Environmental Monitoring and Assessment Program (REMAP) was initiated to test the applicability of the Environmental Monitoring and Assessment Program (EMAP) approach to answer questions about ecological conditions at regional and local scales. Using EMAP's statistical design and indicator concepts, REMAP conducts projects at smaller geographic scales and in shorter time frames than the national EMAP program.

  8. A plan for the North American Bat Monitoring Program (NABat)

    Treesearch

    Susan C. Loeb; Thomas J. Rodhouse; Laura E. Ellison; Cori L. Lausen; Jonathan D. Reichard; Kathryn M. Irvine; Thomas E. Ingersoll; Jeremy T.H. Coleman; Wayne E. Thogmartin; John R. Sauer; Charles M. Francis; Mylea L. Bayless; Thomas R. Stanley; Douglas H. Johnson

    2015-01-01

    The purpose of the North American Bat Monitoring Program (NABat) is to create a continent-wide program to monitor bats at local to rangewide scales that will provide reliable data to promote effective conservation decisionmaking and the long-term viability of bat populations across the continent. This is an international, multiagency program. Four approaches will be...

  9. Program Monitoring: The Role of Leadership in Planning, Assessment, and Communication. REL 2014-034

    ERIC Educational Resources Information Center

    Malone, Nolan; Narayan, Krishna; Mark, Lauren; Miller, Kirsten; Kekahio, Wendy

    2014-01-01

    As educators are increasingly called on to use data to inform improvement initiatives (and are being held accountable for doing so), there is a corresponding need for program leaders to monitor progress. Program monitoring--the systematic and continual observation and recording of key program aspects--can provide leaders with realistic assessments…

  10. Groundwater monitoring of hydraulic fracturing in California: Recommendations for permit-required monitoring

    NASA Astrophysics Data System (ADS)

    Esser, B. K.; Beller, H. R.; Carroll, S.; Cherry, J. A.; Jackson, R. B.; Jordan, P. D.; Madrid, V.; Morris, J.; Parker, B. L.; Stringfellow, W. T.; Varadharajan, C.; Vengosh, A.

    2015-12-01

    California recently passed legislation mandating dedicated groundwater quality monitoring for new well stimulation operations. The authors provided the State with expert advice on the design of such monitoring networks. Factors that must be considered in designing a new and unique groundwater monitoring program include: Program design: The design of a monitoring program is contingent on its purpose, which can range from detection of individual well leakage to demonstration of regional impact. The regulatory goals for permit-required monitoring conducted by operators on a well-by-well basis will differ from the scientific goals of a regional monitoring program conducted by the State. Vulnerability assessment: Identifying factors that increase the probability of transport of fluids from the hydrocarbon target zone to a protected groundwater zone enables the intensity of permit-required monitoring to be tiered by risk and also enables prioritization of regional monitoring of groundwater basins based on vulnerability. Risk factors include well integrity; proximity to existing wellbores and geologic features; wastewater disposal; vertical separation between the hydrocarbon and groundwater zones; and site-specific hydrogeology. Analyte choice: The choice of chemical analytes in a regulatory monitoring program is guided by the goals of detecting impact, assuring public safety, preventing resource degradation, and minimizing cost. Balancing these goals may be best served by tiered approach in which targeted analysis of specific chemical additives is triggered by significant changes in relevant but more easily analyzed constituents. Such an approach requires characterization of baseline conditions, especially in areas with long histories of oil and gas development. Monitoring technology: Monitoring a deep subsurface process or a long wellbore is more challenging than monitoring a surface industrial source. The requirement for monitoring multiple groundwater aquifers across a range of depths and of monitoring at deeper depths than is typical for regulatory monitoring programs requires consideration of monitoring technology, which can range from clusters of wells to multiple wells in a single wellbore to multi-level systems in a single cased wellbore.

  11. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM: AGROECOSYSTEM 1992 PILOT PLAN

    EPA Science Inventory

    The Agroecosystem Resource Group (ARG) of the Environmental Protection Monitoring and Assessment Program (EMAP) has developed a five year program strategy for implementation of a suite of indicators for monitoring agroecosystem status and trends. he five-year period (1991-1995) i...

  12. Integrated Analysis Tools for the NERRS System-Wide Monitoring Program Data

    EPA Science Inventory

    Standardized monitoring programs have vastly improved the quantity and quality of data that form the basis of environmental decision-making. One example is the NOAA-funded National Estuarine Research Reserve System (NERRS) System-wide Monitoring Program (SWMP) that was implement...

  13. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  14. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  15. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  16. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  17. 20 CFR 437.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 437.40 Section 437.40 Employees' Benefits SOCIAL SECURITY ADMINISTRATION UNIFORM ADMINISTRATIVE... Reports, Records, Retention, and Enforcement § 437.40 Monitoring and reporting program performance. (a...

  18. CHARACTERIZATION OF SMALL ESTUARIES AS A COMPONENT OF A REGIONAL-SCALE MONITORING PROGRAM

    EPA Science Inventory

    Large-scale environmental monitoring programs, such as EPA's Environmental Monitoring and Assessment Program (EMAP), by nature focus on estimating the ecological condition of large geographic areas. Generally missing is the ability to provide estimates of condition of individual ...

  19. Enterprise tools to promote interoperability: MonitoringResources.org supports design and documentation of large-scale, long-term monitoringprograms

    NASA Astrophysics Data System (ADS)

    Weltzin, J. F.; Scully, R. A.; Bayer, J.

    2016-12-01

    Individual natural resource monitoring programs have evolved in response to different organizational mandates, jurisdictional needs, issues and questions. We are establishing a collaborative forum for large-scale, long-term monitoring programs to identify opportunities where collaboration could yield efficiency in monitoring design, implementation, analyses, and data sharing. We anticipate these monitoring programs will have similar requirements - e.g. survey design, standardization of protocols and methods, information management and delivery - that could be met by enterprise tools to promote sustainability, efficiency and interoperability of information across geopolitical boundaries or organizational cultures. MonitoringResources.org, a project of the Pacific Northwest Aquatic Monitoring Partnership, provides an on-line suite of enterprise tools focused on aquatic systems in the Pacific Northwest Region of the United States. We will leverage on and expand this existing capacity to support continental-scale monitoring of both aquatic and terrestrial systems. The current stakeholder group is focused on programs led by bureaus with the Department of Interior, but the tools will be readily and freely available to a broad variety of other stakeholders. Here, we report the results of two initial stakeholder workshops focused on (1) establishing a collaborative forum of large scale monitoring programs, (2) identifying and prioritizing shared needs, (3) evaluating existing enterprise resources, (4) defining priorities for development of enhanced capacity for MonitoringResources.org, and (5) identifying a small number of pilot projects that can be used to define and test development requirements for specific monitoring programs.

  20. Integration of structural health monitoring solutions onto commercial aircraft via the Federal Aviation Administration structural health monitoring research program

    NASA Astrophysics Data System (ADS)

    Swindell, Paul; Doyle, Jon; Roach, Dennis

    2017-02-01

    The Federal Aviation Administration (FAA) started a research program in structural health monitoring (SHM) in 2011. The program's goal was to understand the technical gaps of implementing SHM on commercial aircraft and the potential effects on FAA regulations and guidance. The program evolved into a demonstration program consisting of a team from Sandia National Labs Airworthiness Assurance NDI Center (AANC), the Boeing Corporation, Delta Air Lines, Structural Monitoring Systems (SMS), Anodyne Electronics Manufacturing Corp (AEM) and the FAA. This paper will discuss the program from the selection of the inspection problem, the SHM system (Comparative Vacuum Monitoring-CVM) that was selected as the inspection solution and the testing completed to provide sufficient data to gain the first approved use of an SHM system for routine maintenance on commercial US aircraft.

  1. Improving Ecological Response Monitoring of Environmental Flows

    NASA Astrophysics Data System (ADS)

    King, Alison J.; Gawne, Ben; Beesley, Leah; Koehn, John D.; Nielsen, Daryl L.; Price, Amina

    2015-05-01

    Environmental flows are now an important restoration technique in flow-degraded rivers, and with the increasing public scrutiny of their effectiveness and value, the importance of undertaking scientifically robust monitoring is now even more critical. Many existing environmental flow monitoring programs have poorly defined objectives, nonjustified indicator choices, weak experimental designs, poor statistical strength, and often focus on outcomes from a single event. These negative attributes make them difficult to learn from. We provide practical recommendations that aim to improve the performance, scientific robustness, and defensibility of environmental flow monitoring programs. We draw on the literature and knowledge gained from working with stakeholders and managers to design, implement, and monitor a range of environmental flow types. We recommend that (1) environmental flow monitoring programs should be implemented within an adaptive management framework; (2) objectives of environmental flow programs should be well defined, attainable, and based on an agreed conceptual understanding of the system; (3) program and intervention targets should be attainable, measurable, and inform program objectives; (4) intervention monitoring programs should improve our understanding of flow-ecological responses and related conceptual models; (5) indicator selection should be based on conceptual models, objectives, and prioritization approaches; (6) appropriate monitoring designs and statistical tools should be used to measure and determine ecological response; (7) responses should be measured within timeframes that are relevant to the indicator(s); (8) watering events should be treated as replicates of a larger experiment; (9) environmental flow outcomes should be reported using a standard suite of metadata. Incorporating these attributes into future monitoring programs should ensure their outcomes are transferable and measured with high scientific credibility.

  2. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM - AGROECOSYSTEM PILOT FIELD PROGRAM PLAN - 1993

    EPA Science Inventory

    The Agroecosystem Resource Group (ARG) of the Environmental Monitoring and Assessment Program (EMAP) has developed a five-year (1991-1995) strategy for the development, evaluation, and implementation of a suite of indicators for monitoring agroecosystem status and trends on a reg...

  3. 77 FR 71609 - Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5603-N-89] Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring AGENCY: Office of the Chief Information Officer, HUD. ACTION...-Help Homeownership Opportunity Program (SHOP) Grant Monitoring. OMB Approval Number: 2506-0157. Form...

  4. Results of Boron, Surfactant, and Cyanide Investigation, Beale AFB, California

    DTIC Science & Technology

    1991-07-01

    ensure that their discharge does not produce instream toxicity. The Discharger shall carry-out the biotoxicity monitoring program in accordance with...Discharger shall implement the approved biotoxicity monitoring program. d. The Discharger shall submit the results of the biotoxicity monitoring program to

  5. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  6. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  7. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  8. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  9. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 1210.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  10. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 1210.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  11. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 1210.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  12. Ecological Monitoring and Compliance Program 2008 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Dennis J.; Anderson, David C.; Hall, Derek B.

    2009-04-30

    The Ecological Monitoring and Compliance Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2008. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring ofmore » the Nonproliferation Test and Evaluation Complex (NPTEC).« less

  13. Oak Ridge Reservation annual site environmental report for 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koncinski, W.S.

    1996-09-01

    This report presents the details of the environmental monitoring and management program for the Oak Ridge Reservation. Topics discussed include: site background, climate, and operations; environmental compliance strategies; effluent monitoring; environmental management program including environmental restoration, decontamination and decommissioning, technology development, and public involvement; effluent monitoring of airborne discharges, liquid discharges, toxicity control and monitoring, biological monitoring and abatement; environmental surveillance which encompasses meteorological monitoring, ambient air monitoring, surface water monitoring, soils monitoring, sediment monitoring, and contamination of food stuffs monitoring; radiation doses; chemical exposures; ground water monitoring; and quality assurance.

  14. Boreal partners in flight: Working together to build a regional research and monitoring program

    USGS Publications Warehouse

    Handel, Colleen M.; Bonney, Rick; Pashley, David N.; Cooper, Robert J.; Niles, Larry

    1999-01-01

    Boreal regions of western North America regularly support breeding populations of 130 species of landbirds, including 68 Nearctic-Neotropical migrants. Primary conservation concerns within the region include increased timber harvesting, insect outbreaks, fire suppression, mining, impacts of military training activities, urbanization, and recreational activities. Under auspices of Partners in Flight, biologists, land and resource managers, and conservationists from Alaska and western Canada have combined efforts to develop a regional research and monitoring program for landbirds. An experimental monitoring program has been under way during the past four years to test the relative statistical power and cost-effectiveness of various monitoring methods in Alaska. Joint efforts currently include the Alaska Checklist Project on National Wildlife Refuges, 75 Breeding Bird Surveys along the road system, 122 Off-road Point Count routes, 27 Monitoring Avian Productivity and Survivorship banding sites, and 8 migration banding stations. The ultimate goal is to design a comprehensive monitoring program that is sensitive to changes in population size, survival rates, and productivity, but robust enough to accommodate logistical constraints that arise when working in vast, roadless areas with limited funds and staff. Primary challenges that must be faced to assure the long-term future of such a program are obtaining long-term commitment from resource agencies in the region, integrating this program with other national and regional programs that address those species and habitats that are inadequately monitored by established techniques, and developing cooperative research, monitoring, and management programs at the landscape level.

  15. The implementation of medical monitoring programs following potentially hazardous exposures: a medico-legal perspective.

    PubMed

    Vearrier, David; Greenberg, Michael I

    2017-11-01

    Clinical toxicologists may be called upon to determine the appropriateness of medical monitoring following documented or purported exposures to toxicants in the occupational, environmental, and medical settings. We searched the MEDLINE database using the Ovid ® search engine for the following terms cross-referenced to the MeSH database: ("occupational exposures" OR "environmental exposures") AND ("physiologic monitoring" OR "population surveillance"). The titles and abstracts of the resulted articles were reviewed for relevance. We expanded our search to include non-peer-reviewed publications and gray literature and resources using the same terms as utilized in the MEDLINE search. There were a total of 48 relevant peer-reviewed and non-peer-reviewed publications. Publications excluded contained no information relevant to medical monitoring following potentially harmful toxicologic exposures, discussed only worker screening/surveillance and/or population biomonitoring, contained redundant information, or were superseded by more recent information. Approaches to medical monitoring: A consensus exists in the peer-reviewed medical literature, legal literature, and government publications that for medical monitoring to be a beneficial public health activity, careful consideration must be given to potential benefits and harms of the program. Characteristics of the exposure, the adverse human health effect, the screening test, and the natural history of the disease are important in determining whether an exposed population will reap a net benefit or harm from a proposed monitoring program. Broader interpretations of medical monitoring: Some have argued that medical monitoring programs should not be limited to exposure-related outcomes but should duplicate general preventive medicine efforts to improve public health outcomes although an overall reduction of morbidity, mortality and disability by modifying correctable risk factors and disease conditions. This broader approach is inconsistent with the targeted approach advocated by the Agency for Toxic Substances and Disease Registry and the United States Preventive Services Task Force and the bulk of the peer-reviewed medical literature. Medical monitoring in legal contexts: Numerous medical monitoring actions have been litigated. Legal rationales for allowing medical monitoring claims often incorporate some of the scientific criteria for the appropriateness of monitoring programs. In the majority of cases in which plaintiffs were awarded medical monitoring relief, plaintiffs were required to demonstrate both that the condition for which medical monitoring was sought could be detected early, and that early detection and treatment will improve morbidity and mortality. However, the treatment of medical monitoring claims varies significantly depending upon jurisdiction. Examples of large-scale, comprehensive medical monitoring programs: Large-scale, comprehensive medical monitoring programs have been implemented, such as the Fernald Medical Monitoring Program and the World Trade Center Health Program, both of which exceeded the scope of medical monitoring typically recommended in the peer-reviewed medical literature and the courts. The Fernald program sought to prevent death and disability due to non-exposure-related conditions in a manner similar to general preventive medicine. The World Trade Center Health Program provides comprehensive medical care for World Trade Center responders and may be viewed as a large-scale, federally--funded research effort, which distinguishes it from medical monitoring in a medico-legal context. Synthesis of public health approaches to medical monitoring: Medical monitoring may be indicated following a hazardous exposure in limited circumstances. General causation for a specific adverse health effect must be either established by scientific consensus through a formal causal analysis using a framework such as the Bradford-Hill criteria. The exposure must be characterized and must be of sufficient severity that the exposed population has a significantly elevated risk of an adverse health effect. Monitoring must result in earlier detection of the condition than would otherwise occur and must confer a benefit in the form of primary, secondary or tertiary prevention. Outcome tables may be of use in describing the potential benefits and harms of a proposed monitoring program. In the context of litigation, plaintiffs may seek medical monitoring programs after documented or putative exposures. The role of the clinical toxicologist, in this setting, is to evaluate the scientific justifications and medical risks and assist the courts in determining whether monitoring would be expected to result in a net public health benefit.

  16. LESSONS-LEARNED AND SUCCESS STORIES FROM EPA'S REAL-TIME ENVIRONMENTAL MONITORING, DATA DELIVERY, AND PUBLIC OUTREACH PROGRAM

    EPA Science Inventory

    TTSD has completed a series of technology transfer and risk communication handbooks, case studies, and summary reports for community-based environmental monitoring projects under EPA's Real-Time Environmental Monitoring, Data Delivery, and Public Outreach Program. The Program tak...

  17. 49 CFR 227.103 - Noise monitoring program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Noise monitoring program. 227.103 Section 227.103..., DEPARTMENT OF TRANSPORTATION OCCUPATIONAL NOISE EXPOSURE Occupational Noise Exposure for Railroad Operating Employees. § 227.103 Noise monitoring program. (a) Schedule. A railroad shall develop and implement a noise...

  18. United States of America Ocean Dumping Report for Calendar Year 1981. Dredged Material.

    DTIC Science & Technology

    1982-06-01

    to monitoring studies under the Disposal Area Monitoring System ( DAHOS ) program. The program is designed to identify and evaluate impacts resulting...sites. The DAHOS program continually contributes to the development of new monitoring methodologies that reflect on the efficiency of field observations

  19. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... frequency with which the performance reports will be submitted with the Request for Advance or Reimbursement... 25 Indians 1 2010-04-01 2010-04-01 false Monitoring and reporting program performances. 276.9... reporting program performances. (a) Grantees shall constantly monitor the performance under grant-supported...

  20. Patterns of Success: Online Self-Monitoring in a Web-Based Behavioral Weight Control Program

    PubMed Central

    Krukowski, Rebecca A.; Harvey-Berino, Jean; Bursac, Zoran; Ashikaga, Taka; West, Delia Smith

    2016-01-01

    Objectives Online weight control technologies could reduce barriers to treatment, including increased ease and convenience of self-monitoring. Self-monitoring consistently predicts outcomes in behavioral weight loss programs; however, little is known about patterns of self-monitoring associated with success. Methods The current study examines 161 participants (93% female; 31% African-American; mean BMI=35.7±5.7) randomized to a 6-month online behavioral weight control program which offered weekly group “chat” sessions and online self-monitoring. Self-monitoring log-ins were continuously monitored electronically during treatment and examined in association with weight change and demographics. Weekend and weekday log-ins were examined separately and length of periods of continuous self-monitoring were examined. Results We found that 91% of participants logged in to the self-monitoring webpage at least once. Over 6 months, these participants monitored on an average of 28% of weekdays and 17% of weekend days, with most log-ins earlier in the program. Women were less likely to log-in, and there were trends for greater self-monitoring by older participants. Race, education and marital status were not significant predictors of self-monitoring. Both weekday and weekend log-ins were significant independent predictors of weight loss. Patterns of consistent self-monitoring emerged early for participants who went on to achieve greater than a five percent weight loss. Conclusions Patterns of online self-monitoring were strongly associated with weight loss outcomes. These results suggest a specific focus on consistent self-monitoring early in a behavioral weight control program might be beneficial for achieving clinically significant weight losses. PMID:22545978

  1. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Monitoring and reporting program and financial performance. 600.341 Section 600.341 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL... Organizations Post-Award Requirements § 600.341 Monitoring and reporting program and financial performance. (a...

  2. 34 CFR 303.171 - Supervision and monitoring of programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Supervision and monitoring of programs. 303.171 Section 303.171 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF...-Application Requirements § 303.171 Supervision and monitoring of programs. Each application must include...

  3. 34 CFR 303.171 - Supervision and monitoring of programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true Supervision and monitoring of programs. 303.171 Section 303.171 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF...-Application Requirements § 303.171 Supervision and monitoring of programs. Each application must include...

  4. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  5. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  6. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  7. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258... implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the corrective...

  8. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  9. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  10. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  11. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...

  12. A plan for the North American Bat Monitoring Program (NABat)

    USGS Publications Warehouse

    Loeb, Susan C.; Rodhouse, Thomas J.; Ellison, Laura E.; Lausen, Cori L.; Reichard, Jonathan D.; Irvine, Kathryn M.; Ingersoll, Thomas E.; Coleman, Jeremy; Thogmartin, Wayne E.; Sauer, John R.; Francis, Charles M.; Bayless, Mylea L.; Stanley, Thomas R.; Johnson, Douglas H.

    2015-01-01

    The purpose of the North American Bat Monitoring Program (NABat) is to create a continent-wide program to monitor bats at local to rangewide scales that will provide reliable data to promote effective conservation decisionmaking and the long-term viability of bat populations across the continent. This is an international, multiagency program. Four approaches will be used to gather monitoring data to assess changes in bat distributions and abundances: winter hibernaculum counts, maternity colony counts, mobile acoustic surveys along road transects, and acoustic surveys at stationary points. These monitoring approaches are described along with methods for identifying species recorded by acoustic detectors. Other chapters describe the sampling design, the database management system (Bat Population Database), and statistical approaches that can be used to analyze data collected through this program.

  13. Program evaluation of remote heart failure monitoring: healthcare utilization analysis in a rural regional medical center.

    PubMed

    Riley, William T; Keberlein, Pamela; Sorenson, Gigi; Mohler, Sailor; Tye, Blake; Ramirez, A Susana; Carroll, Mark

    2015-03-01

    Remote monitoring for heart failure (HF) has had mixed and heterogeneous effects across studies, necessitating further evaluation of remote monitoring systems within specific healthcare systems and their patient populations. "Care Beyond Walls and Wires," a wireless remote monitoring program to facilitate patient and care team co-management of HF patients, served by a rural regional medical center, provided the opportunity to evaluate the effects of this program on healthcare utilization. Fifty HF patients admitted to Flagstaff Medical Center (Flagstaff, AZ) participated in the project. Many of these patients lived in underserved and rural communities, including Native American reservations. Enrolled patients received mobile, broadband-enabled remote monitoring devices. A matched cohort was identified for comparison. HF patients enrolled in this program showed substantial and statistically significant reductions in healthcare utilization during the 6 months following enrollment, and these reductions were significantly greater compared with those who declined to participate but not when compared with a matched cohort. The findings from this project indicate that a remote HF monitoring program can be successfully implemented in a rural, underserved area. Reductions in healthcare utilization were observed among program participants, but reductions were also observed among a matched cohort, illustrating the need for rigorous assessment of the effects of HF remote monitoring programs in healthcare systems.

  14. Migration monitoring in shorebirds and landbirds: commonalities and differences

    Treesearch

    Susan K. Skagen; Jonathan Bart

    2005-01-01

    Several aspects of a developing program to monitor shorebirds in the western hemisphere are pertinent to migration monitoring of landbirds. Goals of the Program for Regional and International Shorebird Monitoring (PRISM) include estimating population size and population trends of 74 species, sub-species and distinct populations of North American shorebirds, monitoring...

  15. Alberta Biodiversity Monitoring Program - monitoring effectiveness of sustainable forest management planning

    Treesearch

    J. John Stadt; Jim Schieck; Harry Stelfox

    2006-01-01

    The Alberta Biodiversity Monitoring Program is a rigorous science-based initiative that is being developed to monitor and report on biodiversity status and trends throughout the province of Alberta, Canada. Forest management plans in Alberta are required to monitor and report on the achievement of stated sustainable forest management objectives; however, the...

  16. Lindenmayer DB and Likens GE (eds): Effective ecological monitoring [book review

    Treesearch

    Charles T. Scott

    2011-01-01

    Long-term ecological monitoring is becoming increasingly important but more challenging to fund. Lindenmayer and Likens describe the common characteristics of successful monitoring programs and of those that fail. They draw upon their monitoring experiences together, independently, and from a variety of other long-term monitoring programs around the world. They then...

  17. Potential of a national monitoring program for forests to assess change in high-latitude ecosystems

    Treesearch

    Tara M. Barrett; Andrew N. Gray

    2011-01-01

    Broad-scale monitoring in Alaska has become of increasing interest due to uncertainty about the potential impacts of changing climate on high-latitude ecosystems. The Forest Inventory and Analysis (FIA) program is a national monitoring program for all public and private forestlands in the US, but the program is not currently implemented in the boreal region of Alaska....

  18. Integration of strategic inventory and monitoring programs for the forest lands, wood lands, range lands and agricultural lands of the United States

    Treesearch

    Raymond L. Czaplewski

    1999-01-01

    The United States Department of Agriculture uses the Forest Inventory and Analysis (FIA) program to monitor the nation's forests and wood lands, and the National Resources Inventory (NRI) program to monitor the nation's agricultural and range lands. Although their measurement methods and sampling frames are very different, both programs are developing annual...

  19. The Savannah River Site's Groundwater Monitoring Program, third quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  20. Overview of national bird population monitoring programs and databases

    Treesearch

    Gregory S. Butcher; Bruce Peterjohn; C. John Ralph

    1993-01-01

    A number of programs have been set up to monitor populations of nongame migratory birds. We review these programs and their purposes and provide information on obtaining data or results from these programs. In addition, we review recommendations for improving these programs.

  1. Monitoring and evaluation of mental health and psychosocial support programs in humanitarian settings: a scoping review of terminology and focus.

    PubMed

    Augustinavicius, Jura L; Greene, M Claire; Lakin, Daniel P; Tol, Wietse A

    2018-01-01

    Monitoring and evaluation of mental health and psychosocial support (MHPSS) programs is critical to facilitating learning and providing accountability to stakeholders. As part of an inter-agency effort to develop recommendations on MHPSS monitoring and evaluation, this scoping review aimed to identify the terminology and focus of monitoring and evaluation frameworks in this field. We collected program documents (logical frameworks (logframes) and theories of change) from members of the Inter-Agency Standing Committee Reference Group on MHPSS, and systematically searched the peer-reviewed literature across five databases. We included program documents and academic articles that reported on monitoring and evaluation of MHPSS in low- and middle-income countries describing original data. Inclusion and data extraction were conducted in parallel by independent reviewers. Thematic analysis was used to identify common language in the description of practices and the focus of each monitoring and evaluation framework. Logframe outcomes were mapped to MHPSS activity categories. We identified 38 program documents and 89 peer-reviewed articles, describing monitoring and evaluation of a wide range of MHPSS activities. In both program documents and peer-reviewed literature there was a lack of specificity and overlap in language used for goals and outcomes. Well-validated, reliable instruments were reported in the academic literature, but rarely used in monitoring and evaluation practices. We identified six themes in the terminology used to describe goals and outcomes. Logframe outcomes were more commonly mapped to generic program implementation activities (e.g. "capacity building") and those related to family and community support, while outcomes from academic articles were most frequently mapped to specialized psychological treatments. Inconsistencies between the language used in research and practice and discrepancies in measurement have broader implications for monitoring and evaluation in MHPSS programs in humanitarian settings within low- and middle-income countries. This scoping review of the terminology commonly used to describe monitoring and evaluation practices and their focus within MHPSS programming highlights areas of importance for the development of a more standardized approach to monitoring and evaluation.

  2. 10 CFR 60.143 - Monitoring and testing waste packages.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... package monitoring program shall include laboratory experiments which focus on the internal condition of... the laboratory experiments. (d) The waste package monitoring program shall continue as long as...

  3. 10 CFR 60.143 - Monitoring and testing waste packages.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... package monitoring program shall include laboratory experiments which focus on the internal condition of... the laboratory experiments. (d) The waste package monitoring program shall continue as long as...

  4. 10 CFR 60.143 - Monitoring and testing waste packages.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... package monitoring program shall include laboratory experiments which focus on the internal condition of... the laboratory experiments. (d) The waste package monitoring program shall continue as long as...

  5. 10 CFR 60.143 - Monitoring and testing waste packages.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... package monitoring program shall include laboratory experiments which focus on the internal condition of... the laboratory experiments. (d) The waste package monitoring program shall continue as long as...

  6. 10 CFR 60.143 - Monitoring and testing waste packages.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... package monitoring program shall include laboratory experiments which focus on the internal condition of... the laboratory experiments. (d) The waste package monitoring program shall continue as long as...

  7. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  8. Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada

    2005-03-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information requiredmore » for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.« less

  9. 76 FR 45603 - Agency Information Collection Activities: Comment Request for the North American Amphibian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Collection Activities: Comment Request for the North American Amphibian Monitoring Program (NAAMP) AGENCY: U... Monitoring Program (NAAMP). As required by the Paperwork Reduction Act (PRA) of 1995, and as part of our... assigned survey routes that are part of the North American Amphibian Monitoring Program. Volunteers use an...

  10. 41 CFR 109-45.1002-3 - Precious metals recovery program monitor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Precious metals recovery program monitor. 109-45.1002-3 Section 109-45.1002-3 Public Contracts and Property Management Federal... Metals § 109-45.1002-3 Precious metals recovery program monitor. The DPMO shall be the precious metals...

  11. 41 CFR 109-45.1002-3 - Precious metals recovery program monitor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... program monitor. 109-45.1002-3 Section 109-45.1002-3 Public Contracts and Property Management Federal... UTILIZATION AND DISPOSAL 45-SALE, ABANDONMENT, OR DESTRUCTION OF PERSONAL PROPERTY 45.10-Recovery of Precious Metals § 109-45.1002-3 Precious metals recovery program monitor. The DPMO shall be the precious metals...

  12. GUI Type Fault Diagnostic Program for a Turboshaft Engine Using Fuzzy and Neural Networks

    NASA Astrophysics Data System (ADS)

    Kong, Changduk; Koo, Youngju

    2011-04-01

    The helicopter to be operated in a severe flight environmental condition must have a very reliable propulsion system. On-line condition monitoring and fault detection of the engine can promote reliability and availability of the helicopter propulsion system. A hybrid health monitoring program using Fuzzy Logic and Neural Network Algorithms can be proposed. In this hybrid method, the Fuzzy Logic identifies easily the faulted components from engine measuring parameter changes, and the Neural Networks can quantify accurately its identified faults. In order to use effectively the fault diagnostic system, a GUI (Graphical User Interface) type program is newly proposed. This program is composed of the real time monitoring part, the engine condition monitoring part and the fault diagnostic part. The real time monitoring part can display measuring parameters of the study turboshaft engine such as power turbine inlet temperature, exhaust gas temperature, fuel flow, torque and gas generator speed. The engine condition monitoring part can evaluate the engine condition through comparison between monitoring performance parameters the base performance parameters analyzed by the base performance analysis program using look-up tables. The fault diagnostic part can identify and quantify the single faults the multiple faults from the monitoring parameters using hybrid method.

  13. Adapting HIV patient and program monitoring tools for chronic non-communicable diseases in Ethiopia.

    PubMed

    Letebo, Mekitew; Shiferaw, Fassil

    2016-06-02

    Chronic non-communicable diseases (NCDs) have become a huge public health concern in developing countries. Many resource-poor countries facing this growing epidemic, however, lack systems for an organized and comprehensive response to NCDs. Lack of NCD national policy, strategies, treatment guidelines and surveillance and monitoring systems are features of health systems in many developing countries. Successfully responding to the problem requires a number of actions by the countries, including developing context-appropriate chronic care models and programs and standardization of patient and program monitoring tools. In this cross-sectional qualitative study we assessed existing monitoring and evaluation (M&E) tools used for NCD services in Ethiopia. Since HIV care and treatment program is the only large-scale chronic care program in the country, we explored the M&E tools being used in the program and analyzed how these tools might be adapted to support NCD services in the country. Document review and in-depth interviews were the main data collection methods used. The interviews were held with health workers and staff involved in data management purposively selected from four health facilities with high HIV and NCD patient load. Thematic analysis was employed to make sense of the data. Our findings indicate the apparent lack of information systems for NCD services, including the absence of standardized patient and program monitoring tools to support the services. We identified several HIV care and treatment patient and program monitoring tools currently being used to facilitate intake process, enrolment, follow up, cohort monitoring, appointment keeping, analysis and reporting. Analysis of how each tool being used for HIV patient and program monitoring can be adapted for supporting NCD services is presented. Given the similarity between HIV care and treatment and NCD services and the huge investment already made to implement standardized tools for HIV care and treatment program, adaptation and use of HIV patient and program monitoring tools for NCD services can improve NCD response in Ethiopia through structuring services, standardizing patient care and treatment, supporting evidence-based planning and providing information on effectiveness of interventions.

  14. Regional monitoring programs in the United States: Synthesis of four case studies from Pacific, Atlantic, and Gulf Coasts

    USGS Publications Warehouse

    Tango, Peter J.; Schiff, K.; Trowbridge, P.R.; Sherwood, E.T.; Batiuk, R.A.

    2016-01-01

    Water quality monitoring is a cornerstone of environmental protection and ambient monitoring provides managers with the critical data they need to take informed action. Unlike site-specific monitoring that is at the heart of regulatory permit compliance, regional monitoring can provide an integrated, holistic view of the environment, allowing managers to obtain a more complete picture of natural variability and cumulative impacts, and more effectively prioritize management actions. By reviewing four long-standing regional monitoring programs that cover portions of all three coasts in the United States – Chesapeake Bay, Tampa Bay, Southern California Bight, and San Francisco Bay – important insights can be gleaned about the benefits that regional monitoring provides to managers. These insights include the underlying reasons that make regional monitoring programs successful, the challenges to maintain relevance and viability in the face of ever-changing technology, competing demands and shifting management priorities. The lessons learned can help other managers achieve similar successes as they seek to establish and reinvigorate their own monitoring programs.

  15. Personal digital assistants are comparable to traditional diaries for dietary self-monitoring during a weight loss program.

    PubMed

    Yon, Bethany A; Johnson, Rachel K; Harvey-Berino, Jean; Gold, Beth Casey; Howard, Alan B

    2007-04-01

    Dietary self-monitoring is considered the core of behavioral weight control programs. As software for personal digital assistants (PDA) has become more available, this study investigated whether the use of a PDA would improve dietary self-monitoring frequency and subsequent weight loss over the use of traditional paper diaries. One-hundred-seventy-six adults (BMI 25-39.9) participated in a 6-month behavioral weight control program. Treatment subjects (n = 61) were provided with a PalmZire 21 with Calorie King's Diet Diary software installed. Their self-monitoring habits and weight loss were compared with the results from a previous program (n = 115) which followed the same protocol using paper diaries for self-monitoring. No significant differences in weight loss or dietary self-monitoring were found. More frequent self-monitoring correlated with weight loss in both groups (p<.001). People seeking to lose weight should be encouraged to self-monitor and be matched with a mode of self-monitoring that is fitting to their lifestyle and skills.

  16. Ecological Monitoring and Compliance Program 2010 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, D.J.; Anderson, D.C.; Hall, D.B.

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2010. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test andmore » Evaluation Complex (NPTEC). During 2010, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  17. Ecological Monitoring and Compliance Program 2012 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hall, Derek B.; Anderson, David C.; Greger, Paul D.

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2012. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring ofmore » the Nonproliferation Test and Evaluation Complex (NPTEC). During 2012, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  18. Ecological Monitoring and Compliance Program 2009 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, J. Dennis; Anderson, David C.; Hall, Derek B.

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC, during calendar year 2009. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferationmore » Test and Evaluation Complex. During 2009, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  19. Fundamentals of Successful Monitoring, Reporting, and Verification under a Cap and Trade Program

    EPA Pesticide Factsheets

    Learn about the monitoring, reporting, and verification (MRV) elements as they apply to the Acid Rain Program and the Nox Budget Trading Program, and how they can be potentially used in other programs.

  20. A ground-water-quality monitoring program for Nevada

    USGS Publications Warehouse

    Nowlin, Jon O.

    1986-01-01

    A program was designed for the systematic monitoring of ground-water quality in Nevada. Basic hydrologic and water-quality principles are discussed in the formulation of a rational approach to developing a statewide monitoring program. A review of ground-water monitoring efforts in Nevada through 1977 indicates that few requirements for an effective statewide program are being met. A suggested program has been developed that consists of five major elements: (1) A Background-Quality Network to assess the existing water quality in Nevada aquifers, (2) a Contamination Source Inventory of known or potential threats to ground-water quality, (3) Surveillance Networks to monitor ground-water quality in selected hydrographic areas, (4) Intensive Surveys of individual instances of known or potential ground-water contamination, and (5) Ground-Water Data File to manage data generated by the other monitoring elements. Two indices have been developed to help assign rational priorities for monitoring ground water in the 255 hydrographic areas of Nevada: (1) A Hydrographic-Area Priority Index for surveillance monitoring, and (2) A Development-Potential Index for background monitoring of areas with little or no current development. Requirements for efficient management of data from ground-water monitoring are discussed and the three major systems containing Nevada ground-water data are reviewed. More than 11,000 chemical analyses of ground water have been acquired from existing systems and incorporated into a prototype data base.

  1. 42 CFR 460.192 - Ongoing monitoring after trial period.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SERVICES (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Federal/State Monitoring § 460.192 Ongoing monitoring after trial period. (a...

  2. 42 CFR 460.190 - Monitoring during trial period.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) Federal/State Monitoring § 460.190 Monitoring during trial period. (a) Trial period review...

  3. The US Navy’s Helicopter Integrated Diagnostics System (HIDS) Program: Power Drive Train Crack Detection Diagnostics and Prognostics Life Usage Monitoring and Damage Tolerance; Techniques, Methodologies, and Experiences

    DTIC Science & Technology

    2000-02-01

    HIDS] Program: Power Drive Train Crack Detection Diagnostics and Prognostics ife Usage Monitoring and Damage Tolerance; Techniques, Methodologies, and...and Prognostics , Life Usage Monitoring , and Damage Tolerance; Techniques, Methodologies, and Experiences Andrew Hess Harrison Chin William Hardman...continuing program and deployed engine monitoring systems in fixed to evaluate helicopter diagnostic, prognostic , and wing aircraft, notably on the A

  4. Ecological Monitoring and Compliance Program 2015 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hall, Derek B.; Ostler, W. Kent; Anderson, David C.

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2015. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2015, all applicable laws, regulations, andmore » permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  5. Ecological Monitoring and Compliance Program 2013 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hall, Derek B.; Anderson, David C.; Greger, Paul D.

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2013. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2013, allmore » applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  6. Ecological Monitoring and Compliance Program 2016 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hall, Derek; Perry, Jeanette; Ostler, W. Kent

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2016. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2016, all applicable laws, regulations, andmore » permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  7. STATISTICAL PERSPECTIVE ON THE DESIGN AND ANALYSIS ON NATURAL RESOURCE MONITORING PROGRAMS

    EPA Science Inventory

    Natural resource monitoring includes a wide variation in the type of natural resource monitored as well as in the objectives for the monitoring. Rather than address the entire breadth, the focus will be restricted to programs whose focus is to produce state, regional, or nationa...

  8. Preparation of regional shorebird monitoring plans

    Treesearch

    Jonathan Bart; Ann Manning; Susan Thomas; Catherine Wightman

    2005-01-01

    Shorebird monitoring programs in Canada and the United States are being developed under the auspices of PRISM, the Program for Regional and International Shorebird Monitoring. PRISM provides a single blueprint for implementing the monitoring proposals in the shorebird conservation plans prepared recently in Canada and the United States. It includes four segments:...

  9. Designing monitoring programs in an adaptive management context for regional multiple species conservation plans

    USGS Publications Warehouse

    Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.

    2004-01-01

    critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.

  10. A synthesis of evaluation monitoring projects by the forest health monitoring program (1998-2007)

    Treesearch

    William A. Bechtold; Michael J. Bohne; Barbara L. Conkling; Dana L. Friedman

    2012-01-01

    The national Forest Health Monitoring Program of the Forest Service, U.S. Department of Agriculture, has funded over 200 Evaluation Monitoring projects. Evaluation Monitoring is designed to verify and define the extent of deterioration in forest ecosystems where potential problems have been identified. This report is a synthesis of results from over 150 Evaluation...

  11. Air quality monitor and acid rain networks

    NASA Technical Reports Server (NTRS)

    Rudolph, H.

    1980-01-01

    The air quality monitor program which consists of two permanent air monitor stations (PAMS's) and four mobile shuttle pollutant air monitor stations (SPAMS's) is evaluated. The PAMS measures SO sub X, NO sub X particulates, CO, O3, and nonmethane hydrocarbons. The SPAMS measures O3, SO2, HCl, and particulates. The collection and analysis of data in the rain monitor program are discussed.

  12. Concentrations of Elements in Hellbender Blood and Fish Fillets from the Missouri Department of Conservation Monitoring Programs

    USGS Publications Warehouse

    May, Thomas W.; Walther, Mike J.; Brumbaugh, William G.

    2007-01-01

    This report presents the results of contaminant monitoring surveys conducted annually by the Missouri Department of Conservation to examine the levels of selected elemental contaminants in hellbender (Cryptobranchus alleganiensis) blood and fish. Catfish (Ictalurus furcatus, Ictalurus punctatus, Pylodictis olivaris), redhorse (Moxostoma anisorum, Moxostoma erythrurum), bass (Micropterus salmoides, Micropterus punctulatus, Micropterus Lacepede, Ambloplites rupestris), walleye (Sander vitreus), and sunfish (Lepomis megalotis) were collected from 17 sites as part of the Department's General Contaminant Monitoring Program. Bluegill (Lepomis macrochirus) and other sunfish (Lepomis megalotis, Lepomis cyanellus) were collected from 18 sites as part of the Department's Resource Assessment and Monitoring Program. Blood from hellbenders was collected from seven sites as part of the Department's Hellbender Monitoring Program.

  13. A framework for assessment and monitoring of arthropods in a lowland tropical forest.

    PubMed

    Finnamore, Albert; Alonso, Alfonso; Santisteban, Jose; Cordova, Saida; Valencia, Gorky; de la Cruz, Alicia; Polo, Roberto

    2002-05-01

    By applying principles of adaptive management, and by using the valuable information that arthropods provide from assessment and monitoring programs, managers can identify and reduce possible impacts on biodiversity in development projects. In 1996, the Smithsonian Institution's Monitoring and Assessment of Biodiversity program worked together with Shell Prospecting and Development Peru to establish an adaptive management program to protect biodiversity in a natural gas exploration project in a Peruvian rainforest. In this paper, we outlined the conceptual steps involved in establishing an assessment and monitoring program for arthropods, including setting objectives, evaluating the results and making decisions. We also present the results of the assessment using some of groups of arthropods, and summarize the steps taken to identify appropriate groups for monitoring.

  14. An Overview of the Ontario Forest Bird Monitoring Program in Canada

    Treesearch

    Daniel A. Welsh

    1995-01-01

    In 1987, the Canadian Wildlife Service (Ontario Region) initiated a program to inventory and monitor trends in forest birds. The Forest Bird Monitoring Program (FBMP) was designed to describe changes in numbers over time for all forest songbirds, to develop a habitat-specific baseline inventory of forest birds (species composition and relative abundance), and to...

  15. The strategy and design of the effectiveness monitoring program for the Northwest Forest Plan.

    Treesearch

    Barry S. Mulder; Barry R. Noon; Thomas A. Spies; Martin G. Raphael; Craig J. Palmer; Anthony R. Olsen; Gordon H. Reeves; Hartwell H. Welsh

    1999-01-01

    This report describes the logic and design of an effectiveness monitoring program for the Northwest Forest Plan. The program is prospective, providing an early warning of environmental change before irreversible loss has occurred. Monitoring is focused at two resource levels: individual species and specific ecosystem types. Selection of prospective indicators for the...

  16. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... EDUCATION ASSISTANCE ACT PROGRAM UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS § 276.9 Monitoring and... the following for each program, function, or activity involved: (1) A comparison of actual...

  17. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EDUCATION ASSISTANCE ACT PROGRAM UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS § 276.9 Monitoring and... the following for each program, function, or activity involved: (1) A comparison of actual...

  18. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... EDUCATION ASSISTANCE ACT PROGRAM UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS § 276.9 Monitoring and... the following for each program, function, or activity involved: (1) A comparison of actual...

  19. The Influence of Wireless Self-Monitoring Program on the Relationship Between Patient Activation and Health Behaviors, Medication Adherence, and Blood Pressure Levels in Hypertensive Patients: A Substudy of a Randomized Controlled Trial.

    PubMed

    Kim, Ju Young; Wineinger, Nathan E; Steinhubl, Steven R

    2016-06-22

    Active engagement in the management of hypertension is important in improving self-management behaviors and clinical outcomes. Mobile phone technology using wireless monitoring tools are now widely available to help individuals monitor their blood pressure, but little is known about the conditions under which such technology can effect positive behavior changes or clinical outcomes. To study the influence of wireless self-monitoring program and patient activation measures on health behaviors, medication adherence, and blood pressure levels as well as control of blood pressure in hypertensive patients. We examined a subset of 95 hypertensive participants from a 6-month randomized controlled trial designed to determine the utility of a wireless self-monitoring program (n=52 monitoring program, n=43 control), which consisted of a blood pressure monitoring device connected with a mobile phone, reminders for self-monitoring, a Web-based disease management program, and a mobile app for monitoring and education, compared with the control group receiving a standard disease management program. Study participants provided measures of patient activation, health behaviors including smoking, drinking, and exercise, medication adherence, and blood pressure levels. We assessed the influence of wireless self-monitoring as a moderator of the relationship between patient activation and health behaviors, medication adherence, and control of blood pressure. Improvements in patient activation were associated with improvements in cigarette smoking (beta=-0.46, P<.001) and blood pressure control (beta=0.04, P=.02). This relationship was further strengthened in reducing cigarettes (beta=-0.60, P<.001), alcohol drinking (beta=-0.26, P=.01), and systolic (beta=-0.27, P=.02) and diastolic blood pressure (beta=-0.34, P=.007) at 6 months among individuals participating in the wireless self-monitoring program. No differences were observed with respect to medication adherence. Participation in a wireless self-monitoring program provides individuals motivated to improve their health management with an added benefit above and beyond that of motivation alone. Hypertensive individuals eager to change health behaviors are excellent candidates for mobile health self-monitoring.. ClinicalTrials.gov NCT01975428, https://clinicaltrials.gov/ct2/show/NCT01975428 (Archived by WebCite at http://www.webcitation.org/6iSO5OgOG).

  20. Lessons from a Community-Based Program to Monitor Forest Vertebrates in the Brazilian Amazon

    NASA Astrophysics Data System (ADS)

    Benchimol, Maíra; von Mühlen, Eduardo M.; Venticinque, Eduardo M.

    2017-09-01

    A large number of sustainable use reserves recently have been titled in the Brazilian Amazonia. These reserves require public participation in the design and implementation of management and monitoring programs. Species-monitoring programs that engage local stakeholders may be useful for assessing wildlife status over the long term. We collaborated on the development of a participatory program to monitor forest vertebrates in the Piagaçu-Purus Sustainable Development Reserve and to build capacity among the local people. We examined relations between the distance to the nearest human community and sighting rates of each species, and evaluated the program overall. Eighteen wildlife monitors received training in line transect and sign surveys and then conducted surveys along a total of ten transects. Sighting rates of most species in the Piagaçu-Purus Sustainable Development Reserve were higher than those reported in other Amazonian forests. Distance to the human community was not associated with the overall vertebrate sighting rate. Use of the trained monitors was successful in terms of data acquisition and engagement. The involvement of local people promoted discussions about regulation of hunting in the reserve. Implementation of community-based programs to monitor forest wildlife in Amazonian sustainable use reserves may empower local communities and assess the status of wildlife through time.

  1. A guide to processing bat acoustic data for the North American Bat Monitoring Program (NABat)

    USGS Publications Warehouse

    Reichert, Brian; Lausen, Cori; Loeb, Susan; Weller, Ted; Allen, Ryan; Britzke, Eric; Hohoff, Tara; Siemers, Jeremy; Burkholder, Braden; Herzog, Carl; Verant, Michelle

    2018-06-14

    The North American Bat Monitoring Program (NABat) aims to improve the state of conservation science for all species of bats shared by the United States, Canada, and Mexico. To accomplish this goal, NABat offers guidance and standardized protocols for acoustic monitoring of bats. In this document, “A Guide to Processing Bat Acoustic Data for the North American Bat Monitoring Program (NABat),” we provide general recommendations and specific workflows for the process of identifying bat species from acoustic files recorded using the NABat stationary point and mobile transect acoustic monitoring protocols.

  2. Impact of a Pharmacy-Cardiology Collaborative Practice on Dofetilide Safety Monitoring.

    PubMed

    Quffa, Lieth H; Panna, Mark; Kaufmann, Michael R; McKillop, Matthew; Dietrich, Nicole Maltese; Franck, Andrew J

    2017-01-01

    Limited studies have been published examining dofetilide's postmarketing use and its recommended monitoring. To evaluate the impact of a collaborative pharmacy-cardiology antiarrhythmic drug (AAD) monitoring program on dofetilide monitoring. This retrospective cohort study was performed to assess if a novel monitoring program improved compliance with dofetilide-specific monitoring parameters based on the Food and Drug Administration's Risk Evaluation and Mitigation Strategy. A total of 30 patients were included in the analysis. The monitoring parameters evaluated included electrocardiogram, serum potassium, serum magnesium, and kidney function. The primary outcome evaluated was the composite of these dofetilide monitoring parameters obtained in each cohort. In the standard cohort, 245 of 352 (69.6%) monitoring parameters were completed versus 134 of 136 (98.5%) in the intervention group ( P < 0.05). A collaborative pharmacy-cardiology AAD monitoring program was associated with a significant improvement in dofetilide monitoring. This improvement could potentially translate into enhanced patient safety outcomes, such as prevention of adverse drug reactions and decreased hospitalizations.

  3. Multiple ART Programs Create a Dilemma for Providers to Monitor ARV Adherence in Uganda.

    PubMed

    Obua, Celestino; Gusdal, Annelie; Waako, Paul; Chalker, John C; Tomson, Goran; Wahlström, Rolf; Team, The Inrud-Iaa

    2011-01-01

    Increased availability and accessibility of antiretroviral therapy (ART) has improved the length and quality of life amongst people living with HIV/AIDS. This has changed the landscape for care from episodic to long-term care that requires more monitoring of adherence. This has led to increased demand on human resources, a major problem for most ART programs. This paper presents experiences and perspectives of providers in ART facilities, exploring the organizational factors affecting their capacity to monitor adherence to ARVs. From an earlier survey to test adherence indicators and rank facilities as good, medium or poor adherence performances, six facilities were randomly selected, two from each rank. Observations on facility set-up, provider-patient interactions and key informant interviews were carried out. The strengths, weaknesses, opportunities and threats identified by health workers as facilitators or barriers to their capacity to monitor adherence to ARVs were explored during group discussions. Findings show that the performance levels of the facilities were characterized by four different organizational ART programs operating in Uganda, with apparent lack of integration and coordination at the facilities. Of the six facilities studied, the two high adherence performing facilities were Non-Governmental Organization (NGO) programs, while facilities with dual organizational programs (Governmental/NGO) performed poorly. Working conditions, record keeping and the duality of programs underscored the providers' capacity to monitor adherence. Overall 70% of the observed provider-patient interactions were conducted in environments that ensured privacy of the patient. The mean performance for record keeping was 79% and 50% in the high and low performing facilities respectively. Providers often found it difficult to monitor adherence due to the conflicting demands from the different organizational ART programs. Organizational duality at facilities is a major factor in poor adherence monitoring. The different ART programs in Uganda need to be coordinated and integrated into a single well resourced program to improve ART services and adherence monitoring. The focus on long-term care of patients on ART requires that the limitations to providers' capacity for monitoring adherence become central during the planning and implementation of ART programs.

  4. [The marine coastal water monitoring program of the Italian Ministry of the Environment].

    PubMed

    Di Girolamo, Irene

    2003-01-01

    The Ministry of the Environment carries out marine and coastal monitoring programs with the collaboration of the coastal Regions. The program in progress (2001-2003), on the basis of results of the previous one, has identified 73 particulary significant areas (57 critical areas and 16 control areas). The program investigates several parameters on water, plancton, sediments, mollusks and benthos with analyses fortnightly, six-monthly and annual. The main aim of these three year monitoring programs is to assess the quality of national marine ecosystem.

  5. State-of-the-art practices in farmland biodiversity monitoring for North America and Europe.

    PubMed

    Herzog, Felix; Franklin, Janet

    2016-12-01

    Policy makers and farmers need to know the status of farmland biodiversity in order to meet conservation goals and evaluate management options. Based on a review of 11 monitoring programs in Europe and North America and on related literature, we identify the design choices or attributes of a program that balance monitoring costs and usefulness for stakeholders. A useful program monitors habitats, vascular plants, and possibly faunal groups (ecosystem service providers, charismatic species) using a stratified random sample of the agricultural landscape, including marginal and intensive regions. The size of landscape samples varies with the grain of the agricultural landscape; for example, samples are smaller in Europe and larger in North America. Raw data are collected in a rolling survey, which distributes sampling over several years. Sufficient practical experience is now available to implement broad monitoring schemes on both continents. Technological developments in remote sensing, metagenomics, and social media may offer new opportunities for affordable farmland biodiversity monitoring and help to lower the overall costs of monitoring programs.

  6. Amphibian Research and Monitoring Initiative (ARMI): A successful start to a national program in the United States

    USGS Publications Warehouse

    Muths, Erin; Jung, Robin E.; Bailey, Larissa L.; Adams, Michael J.; Corn, P. Stephen; Dodd, C. Kenneth; Fellers, Gary M.; Sadinski, Walter J.; Schwalbe, Cecil R.; Walls, Susan C.; Fisher, Robert N.; Gallant, Alisa L.; Battaglin, William A.; Green, D. Earl

    2005-01-01

    Most research to assess amphibian declines has focused on local-scale projects on one or a few species. The Amphibian Research and Monitoring Initiative (ARMI) is a national program in the United States mandated by congressional directive and implemented by the U.S. Department of the Interior (specifically the U.S. Geological Survey, USGS). Program goals are to monitor changes in populations of amphibians across U.S. Department of the Interior lands and to address research questions related to amphibian declines using a hierarchical framework of base-, mid- and apex-level monitoring sites. ARMI is currently monitoring 83 amphibian species (29% of species in the U.S.) at mid- and apex-level areas. We chart the progress of this 5-year-old program and provide an example of mid-level monitoring from 1 of the 7 ARMI regions.

  7. Presentation from 2016 STAR Tribal Research Meeting: ANTHC Rural Alaska Monitoring Program (RAMP): Assessing, Monitoring, and Adapting to Emerging Environmental Human and Wildlife Health Threats

    EPA Pesticide Factsheets

    This presentation, ANTHC Rural Alaska Monitoring Program (RAMP): Assessing, Monitoring, and Adapting to Emerging Environmental Human and Wildlife Health Threats, was given at the 2016 STAR Tribal Research Meeting held on Sept. 20-21, 2016.

  8. Chapter 2. Selecting Key Habitat Attributes for Monitoring

    Treesearch

    Gregory D. Hayward; Lowell H. Suring

    2013-01-01

    The success of habitat monitoring programs depends, to a large extent, on carefully selecting key habitat attributes to monitor. The challenge of choosing a limited but sufficient set of attributes will differ depending on the objectives of the monitoring program. In some circumstances, such as managing National Forest System lands for threatened and endangered species...

  9. Chapter 3. Planning and design for habitat monitoring

    Treesearch

    Christina D. Vojta; Lyman L. McDonald; C. Kenneth Brewer; Kevin S. McKelvey; Mary M Rowland; Michael I. Goldstein

    2013-01-01

    This chapter provides guidance for designing a habitat monitoring program so that it will meet the monitoring objective, will be repeatable, and will adequately represent habitat within the spatial extent of interest. Although a number of excellent resources are available for planning and designing a monitoring program for wildlife populations (e.g., Busch and Trexler...

  10. USDA Forest Service goals and programs for monitoring neotropical migratory birds

    Treesearch

    Patricia Manley

    1993-01-01

    The USDA Forest Service (USFS) developed goals, objectives, and guidelines for monitoring neotropical migratory birds (NTMB) on National Forest System lands in response to the Neotropical Migratory Bird Conservation Program Partners in Flight. A USFS task group developed a hierarchical monitoring framework designed to define priorities for type of monitoring data....

  11. History and results of the Northern Forest Health Monitoring Program

    Treesearch

    Charles J. Barnett

    2000-01-01

    Forest Health Monitoring (FHM) Program was established because of a concern that the forests in the United States were declining. The program was established to monitor the state of and changes in forest conditions across the nation. This report looks at the distributions of trees into various rating categories for three variables collected on the FHM plots from 1991...

  12. Small-scale monitoring - can it be integrated with large-scale programs?

    Treesearch

    C. M. Downes; J. Bart; B. T. Collins; B. Craig; B. Dale; E. H. Dunn; C. M. Francis; S. Woodley; P. Zorn

    2005-01-01

    There are dozens of programs and methodologies for monitoring and inventory of bird populations, differing in geographic scope, species focus, field methods and purpose. However, most of the emphasis has been placed on large-scale monitoring programs. People interested in assessing bird numbers and long-term trends in small geographic areas such as a local birding area...

  13. LabVIEW: a software system for data acquisition, data analysis, and instrument control.

    PubMed

    Kalkman, C J

    1995-01-01

    Computer-based data acquisition systems play an important role in clinical monitoring and in the development of new monitoring tools. LabVIEW (National Instruments, Austin, TX) is a data acquisition and programming environment that allows flexible acquisition and processing of analog and digital data. The main feature that distinguishes LabVIEW from other data acquisition programs is its highly modular graphical programming language, "G," and a large library of mathematical and statistical functions. The advantage of graphical programming is that the code is flexible, reusable, and self-documenting. Subroutines can be saved in a library and reused without modification in other programs. This dramatically reduces development time and enables researchers to develop or modify their own programs. LabVIEW uses a large amount of processing power and computer memory, thus requiring a powerful computer. A large-screen monitor is desirable when developing larger applications. LabVIEW is excellently suited for testing new monitoring paradigms, analysis algorithms, or user interfaces. The typical LabVIEW user is the researcher who wants to develop a new monitoring technique, a set of new (derived) variables by integrating signals from several existing patient monitors, closed-loop control of a physiological variable, or a physiological simulator.

  14. The role of digital data entry in participatory environmental monitoring.

    PubMed

    Brammer, Jeremy R; Brunet, Nicolas D; Burton, A Cole; Cuerrier, Alain; Danielsen, Finn; Dewan, Kanwaljeet; Herrmann, Thora Martina; Jackson, Micha V; Kennett, Rod; Larocque, Guillaume; Mulrennan, Monica; Pratihast, Arun Kumar; Saint-Arnaud, Marie; Scott, Colin; Humphries, Murray M

    2016-12-01

    Many argue that monitoring conducted exclusively by scientists is insufficient to address ongoing environmental challenges. One solution entails the use of mobile digital devices in participatory monitoring (PM) programs. But how digital data entry affects programs with varying levels of stakeholder participation, from nonscientists collecting field data to nonscientists administering every step of a monitoring program, remains unclear. We reviewed the successes, in terms of management interventions and sustainability, of 107 monitoring programs described in the literature (hereafter programs) and compared these with case studies from our PM experiences in Australia, Canada, Ethiopia, Ghana, Greenland, and Vietnam (hereafter cases). Our literature review showed that participatory programs were less likely to use digital devices, and 2 of our 3 more participatory cases were also slow to adopt digital data entry. Programs that were participatory and used digital devices were more likely to report management actions, which was consistent with cases in Ethiopia, Greenland, and Australia. Programs engaging volunteers were more frequently reported as ongoing, but those involving digital data entry were less often sustained when data collectors were volunteers. For the Vietnamese and Canadian cases, sustainability was undermined by a mismatch in stakeholder objectives. In the Ghanaian case, complex field protocols diminished monitoring sustainability. Innovative technologies attract interest, but the foundation of effective participatory adaptive monitoring depends more on collaboratively defined questions, objectives, conceptual models, and monitoring approaches. When this foundation is built through effective partnerships, digital data entry can enable the collection of more data of higher quality. Without this foundation, or when implemented ineffectively or unnecessarily, digital data entry can be an additional expense that distracts from core monitoring objectives and undermines project sustainability. The appropriate role of digital data entry in PM likely depends more on the context in which it is used and less on the technology itself. © 2016 Society for Conservation Biology.

  15. The Modular Borehole Monitoring Program. A research program to optimize well-based monitoring for geologic carbon sequestration

    DOE PAGES

    Freifeld, Barry; Daley, Tom; Cook, Paul; ...

    2014-12-31

    Understanding the impacts caused by injection of large volumes of CO 2 in the deep subsurface necessitates a comprehensive monitoring strategy. While surface-based and other remote geophysical methods can provide information on the general morphology of a CO 2 plume, verification of the geochemical conditions and validation of the remote sensing data requires measurements from boreholes that penetrate the storage formation. Unfortunately, the high cost of drilling deep wellbores and deploying instrumentation systems constrains the number of dedicated monitoring borings as well as limits the technologies that can be incorporated in a borehole completion. The objective of the Modular Boreholemore » Monitoring (MBM) Program was to develop a robust suite of well-based tools optimized for subsurface monitoring of CO 2 that could meet the needs of a comprehensive well-based monitoring program. It should have enough flexibility to be easily reconfigured for various reservoir geometries and geologies. The MBM Program sought to provide storage operators with a turn-key fully engineered design that incorporated key technologies, function over the decades long time-span necessary for post-closure reservoir monitoring, and meet industry acceptable risk profiles for deep-well installations. While still within the conceptual design phase of the MBM program, the SECARB Anthropogenic Test in Citronelle, Alabama, USA was identified as a deployment site for our engineered monitoring systems. The initial step in designing the Citronelle MBM system was to down-select from the various monitoring tools available to include technologies that we considered essential to any program. Monitoring methods selected included U-tube geochemical sampling, discrete quartz pressure and temperature gauges, an integrated fibre-optic bundle consisting of distributed temperature and heat-pulse sensing, and a sparse string of conventional 3C-geophones. While not originally planned within the initial MBM work scope, the fibre-optic cable was able to also be used for the emergent technology of distributed acoustic sensing. The MBM monitoring string was installed in March, 2012. To date, the Citronelle MBM instruments continue to operate reliably. Results and lessons learned from the Citronelle MBM deployment are addressed along with examples of data being collected.« less

  16. REGIONAL ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM

    EPA Science Inventory

    The U.S. EPA Environmental Monitoring and Assessment Program (EMAP) supports the development and utilization of ecological monitoring as a critical component of environmental management and protection. Its authorization is provided under the Clean Water Act, as amended, Public L...

  17. Implementing AIM-based monitoring for natural resource management

    USDA-ARS?s Scientific Manuscript database

    Successful monitoring programs are built on clearly-defined objectives, thorough planning, and organized implementation. However, natural resource management decisions need to be made at many different organizational levels and scales – from local to national. Developing separate monitoring programs...

  18. Scientific Framework for Stormwater Monitoring by the Washington State Department of Transportation

    USGS Publications Warehouse

    Sheibley, R.W.; Kelly, V.J.; Wagner, R.J.

    2009-01-01

    The Washington State Department of Transportation municipal stormwater monitoring program, in operation for about 8 years, never has received an external, objective assessment. In addition, the Washington State Department of Transportation would like to identify the standard operating procedures and quality assurance protocols that must be adopted so that their monitoring program will meet the requirements of the new National Pollutant Discharge Elimination System municipal stormwater permit. As a result, in March 2009, the Washington State Department of Transportation asked the U.S. Geological Survey to assess their pre-2009 municipal stormwater monitoring program. This report presents guidelines developed for the Washington State Department of Transportation to meet new permit requirements and regional/national stormwater monitoring standards to ensure that adequate processes and procedures are identified to collect high-quality, scientifically defensible municipal stormwater monitoring data. These include: (1) development of coherent vision and cooperation among all elements of the program; (2) a comprehensive approach for site selection; (3) an effective quality assurance program for field, laboratory, and data management; and (4) an adequate database and data management system.

  19. Analysis of U. S. Forest Service bird point-count monitoring database - implications for designing and implementing avian monitoring

    Treesearch

    Eric T. Linder; David A. Buehler

    2005-01-01

    In 1996, Region 8 of the U. S. Forest Service implemented a program to monitor landbirds on southeastern U.S. national forests. The goal was to develop a monitoring system that could document population trends and bird-habitat relationships. Using power analysis, we examined the ability of the monitoring program to detect population trends (3 percent annual change) at...

  20. Statistical package for improved analysis of hillslope monitoring data collected as part of the Board of Forestry's long-term monitoring program

    Treesearch

    Jack Lewis; Jim Baldwin

    1997-01-01

    The State of California has embarked upon a Long-Term Monitoring Program whose primary goal is to assess the effectiveness of the Forest Practice Rules and Review Process in protecting the beneficial uses of waters from the impacts of timber operations on private timberlands. The Board of Forestry's Monitoring Study Group concluded that hillslope monitoring should...

  1. Status of the flora and fauna on the Nevada Test Site, 1988. Results of continuing basic environmental monitoring, January--December 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, R.B.

    1992-06-01

    In 1987 the US Department of Energy (DOE) initiated a program to monitor the health of the Nevada Test Site (NTS) plants and animals in support of the National Environmental Protection Act. The program, part of DOE`s Basic Environmental Compliance and Monitoring Program (BECAMP), monitors perennial and ephemeral plants, the more common species of rodents and lizards, and the horses, deer, raptors and other large animals on the NTS. This is a report of data collected on these flora and fauna for the year 1988, the second year of monitoring.

  2. Software design of a remote real-time ECG monitoring system

    NASA Astrophysics Data System (ADS)

    Yu, Chengbo; Tao, Hongyan

    2005-12-01

    Heart disease is one of the main diseases that threaten the health and lives of human beings. At present, the normal remote ECG monitoring system has the disadvantages of a short testing distance and limitation of monitoring lines. Because of accident and paroxysmal disease, ECG monitoring has extended from the hospital to the family. Therefore, remote ECG monitoring through the Internet has the actual value and significance. The principle and design method of software of the remote dynamic ECG monitor was presented and discussed. The monitoring software is programmed with Delphi software based on client-sever interactive mode. The application program of the system, which makes use of multithreading technology, is shown to perform in an excellent manner. The program includes remote link users and ECG processing, i.e. ECG data's receiving, real-time displaying, recording and replaying. The system can connect many clients simultaneously and perform real-time monitoring to patients.

  3. 12 CFR 361.5 - What are the FDIC's oversight and monitoring responsibilities in administering this program?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 5 2012-01-01 2012-01-01 false What are the FDIC's oversight and monitoring....5 What are the FDIC's oversight and monitoring responsibilities in administering this program? (a... outreach oversight, which includes, but is not limited to, the monitoring, review and interpretation of...

  4. 12 CFR 361.5 - What are the FDIC's oversight and monitoring responsibilities in administering this program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 4 2011-01-01 2011-01-01 false What are the FDIC's oversight and monitoring....5 What are the FDIC's oversight and monitoring responsibilities in administering this program? (a... outreach oversight, which includes, but is not limited to, the monitoring, review and interpretation of...

  5. 6. Monitoring and the Northwest Forest Plan

    Treesearch

    Leslie M. Reid

    1994-01-01

    Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...

  6. Identifying common practices and challenges for local urban tree monitoring programs across the United States

    Treesearch

    Lara A. Roman; E. Gregory McPherson; Bryant C. Scharenbroch; Julia Bartens

    2013-01-01

    Urban forest monitoring data are essential to assess the impacts of tree planting campaigns and management programs. Local practitioners have monitoring projects that have not been well documented in the urban forestry literature. To learn more about practitioner-driven monitoring efforts, the authors surveyed 32 local urban forestry organizations across the United...

  7. Monitoring for conservation

    USGS Publications Warehouse

    Nichols, J.D.; Williams, B.K.

    2006-01-01

    Human-mediated environmental changes have resulted in appropriate concern for the conservation of ecological systems and have led to the development of many ecological monitoring programs worldwide. Many programs that are identified with the purpose of `surveillance? represent an inefficient use of conservation funds and effort. Here, we revisit the 1964 paper by Platt and argue that his recommendations about the conduct of science are equally relevant to the conduct of ecological monitoring programs. In particular, we argue that monitoring should not be viewed as a stand-alone activity, but instead as a component of a larger process of either conservation-oriented science or management. Corresponding changes in monitoring focus and design would lead to substantial increases in the efficiency and usefulness of monitoring results in conservation.

  8. Northern region landbird monitoring program: a program designed to monitor more than long-term population trends

    Treesearch

    Richard L. Hutto

    2005-01-01

    The Northern Region Landbird Monitoring Program (NRLMP) has been in place for nearly a decade and is designed to allow us to track population trends of numerous landbird species, while at the same time allowing us to investigate the effects of various kinds of land use activity on the occurrence, abundance, or demographics of numerous landbird species. We conduct...

  9. The Savannah River Site`s Groundwater Monitoring Program. First quarter 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

  10. Lake Ontario Tributaries: 2009-2010 Field Data Report

    EPA Pesticide Factsheets

    In 2002, EPA began a program to regularly monitor U.S. tributaries to Lake Ontario for the critical pollutants. This report provides program results from 2009-2010, and identifies changes in the monitoring program from prior years.

  11. The Savannah River Site's Groundwater Monitoring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

  12. Niagara Falls Storage Site annual environmental report for calendar year 1991, Lewiston, New York. [Niagara Falls Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Niagara Falls Storage Site (NFSS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at NFSS began in 1981. The site is owned by the US Department of Energy (DOE) and is assigned to the DOE Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program atmore » NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Additionally, several nonradiological parameters including seven metals are routinely measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  13. Niagara Falls Storage Site annual environmental report for calendar year 1991, Lewiston, New York

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Niagara Falls Storage Site (NFSS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at NFSS began in 1981. The site is owned by the US Department of Energy (DOE) and is assigned to the DOE Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program atmore » NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Additionally, several nonradiological parameters including seven metals are routinely measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  14. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  15. Combining accuracy assessment of land-cover maps with environmental monitoring programs

    USGS Publications Warehouse

    Stehman, S.V.; Czaplewski, R.L.; Nusser, S.M.; Yang, L.; Zhu, Z.

    2000-01-01

    A scientifically valid accuracy assessment of a large-area, land-cover map is expensive. Environmental monitoring programs offer a potential source of data to partially defray the cost of accuracy assessment while still maintaining the statistical validity. In this article, three general strategies for combining accuracy assessment and environmental monitoring protocols are described. These strategies range from a fully integrated accuracy assessment and environmental monitoring protocol, to one in which the protocols operate nearly independently. For all three strategies, features critical to using monitoring data for accuracy assessment include compatibility of the land-cover classification schemes, precisely co-registered sample data, and spatial and temporal compatibility of the map and reference data. Two monitoring programs, the National Resources Inventory (NRI) and the Forest Inventory and Monitoring (FIM), are used to illustrate important features for implementing a combined protocol.

  16. 14 CFR 152.417 - Monitoring employment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Monitoring employment. 152.417 Section 152...) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.417 Monitoring employment. (a... on-site or desk audits of covered aviation related activities on airports. ...

  17. 14 CFR 152.417 - Monitoring employment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Monitoring employment. 152.417 Section 152...) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.417 Monitoring employment. (a... on-site or desk audits of covered aviation related activities on airports. ...

  18. MONITORING STREAM CONDITION IN THE WESTERN UNITED STATES

    EPA Science Inventory


    The U.S. Environmental Protection Agency Environmental Monitoring and Assessment Program (EMAP) is a national research program to develop the tools necessary to monitor and assess the- status and trends of ecological resources. EMAP's goal is to develop the scientific underst...

  19. Technology evaluation of control/monitoring systems for MIUS application. [utility services management

    NASA Technical Reports Server (NTRS)

    Pringle, L. M., Jr.

    1974-01-01

    Potential ways of providing control and monitoring for the Modular Integrated Utility System (MIUS) program are elaborated. Control and monitoring hardware and operational systems are described. The requirements for the MIUS program and the development requirements are discussed.

  20. 14 CFR 152.417 - Monitoring employment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Monitoring employment. 152.417 Section 152.417 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.417 Monitoring employment. (a...

  1. COMPARISON OF MULTIPLE POINT AND COMPOSITE SAMPLING FOR THE PURPOSE OF MONITORING BATHING WATER QUALITY

    EPA Science Inventory

    The USEPA Beaches Environmental Assessment and Coastal Health Act (BEACH Act) requires states to develop monitoring and notification programs for recreational waters using approved bacterial indicators. Implementation of an appropriate monitoring program can, under some circumsta...

  2. Recommendations for Health Monitoring and Reporting for Zebrafish Research Facilities

    PubMed Central

    Crim, Marcus J.; Lieggi, Christine

    2016-01-01

    Abstract The presence of subclinical infection or clinical disease in laboratory zebrafish may have a significant impact on research results, animal health and welfare, and transfer of animals between institutions. As use of zebrafish as a model of disease increases, a harmonized method for monitoring and reporting the health status of animals will facilitate the transfer of animals, allow institutions to exclude diseases that may negatively impact their research programs, and improve animal health and welfare. All zebrafish facilities should implement a health monitoring program. In this study, we review important aspects of a health monitoring program, including choice of agents, samples for testing, available testing methodologies, housing and husbandry, cost, test subjects, and a harmonized method for reporting results. Facilities may use these recommendations to implement their own health monitoring program. PMID:26991393

  3. Development of a long-term ecological monitoring program in Denali National Park and Preserve, Alaska (USA)

    USGS Publications Warehouse

    Oakley, Karen L.; Debevec, Edward M.; Rexstad, Eric A.; Aguirre-Bravo, Celedonio; Franco, Carlos Rodriguez

    1999-01-01

    A Long-term Ecological Monitoring (LTEM) program began at Denali National Park and Preserve, Alaska (USA) in 1992, as a prototype for subarctic parks. The early history of the Denali LTEM program provides insight into the challenges that can arise during monitoring program development. The Denali program has thus far taken a watershed approach, involving collocation of study effort for a mix of abiotic and biotic attributes within a small, headwater stream (Rock Creek) which crosses the tundra-taiga boundary. An initial effort at integration and synthesis of meteorological, vegetation, small mammal and passerine bird data for the first 7 years of the program found few correlations, but power was low. We will now attempt to balance the intensive work in Rock Creek by developing a cost-effective sampling design that includes more of the park. We are also working to improve linkages between the monitoring program and park management decision-making and to strengthen data management and reporting mechanisms.

  4. An Operational Safety and Health Program.

    ERIC Educational Resources Information Center

    Uhorchak, Robert E.

    1983-01-01

    Describes safety/health program activities at Research Triangle Institute (North Carolina). These include: radioisotope/radiation and hazardous chemical/carcinogen use, training, monitoring, disposal; chemical waste management; air monitoring and analysis; medical program; fire safety/training, including emergency planning; Occupational Safety and…

  5. Evolving Intelligence, Surveillance & Reconnaissance (ISR) for Air Force Cyber Defense

    DTIC Science & Technology

    2013-02-14

    Telecommunications and Assessment Program ( TMAP ) notes in Air Force Instruction (AFI) 10-712 that “adversaries can easily monitor (unclassified) systems to...Instruction (AFI) 10-712, Telecommunications Monitoring And Assessment Program ( TMAP ), 2011, 4. 23. Lt Col Hugh M. Ragland., interview with author...Monitoring And Assessment Program ( TMAP ), 8 June 2011. Brenner, Carl N. Col, USAF. NASIC Air & Cyber Analysis Group/CC. Interview by the author. 29

  6. Forest Health Monitoring and Forest Inventory Analysis programs monitor climate change effects in forest ecosystems

    Treesearch

    Kenneth W. Stolte

    2001-01-01

    The Forest Health Monitoring (FHM) and Forest Inventory and Analyses (FIA) programs are integrated bilogical monitoring systems that use nationally standardized methods to evaluate and report on the health and sustainability of forest ecosystems in the United States. Many of the anticipated changes in forest ecosystems from climate change were also issues addressed in...

  7. An effectiveness monitoring program for the northwest forest plan: new approaches to common monitoring problems

    Treesearch

    Craig Palmer; Barry Mulder; Barry Noon

    2000-01-01

    The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...

  8. 40 CFR Table 8 to Subpart IIIii of... - Requirements for Cell Room Monitoring Program

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false Requirements for Cell Room Monitoring... Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII, Table 8 Table 8 to Subpart IIIII of Part 63—Requirements for Cell Room Monitoring Program As stated in § 63.8192(g)(1), your mercury monitoring system must...

  9. 40 CFR Table 8 to Subpart IIIii of... - Requirements for Cell Room Monitoring Program

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false Requirements for Cell Room Monitoring... Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII, Table 8 Table 8 to Subpart IIIII of Part 63—Requirements for Cell Room Monitoring Program As stated in § 63.8192(g)(1), your mercury monitoring system must...

  10. 40 CFR Table 8 to Subpart IIIii of... - Requirements for Cell Room Monitoring Program

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false Requirements for Cell Room Monitoring... Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII, Table 8 Table 8 to Subpart IIIII of Part 63—Requirements for Cell Room Monitoring Program As stated in § 63.8192(g)(1), your mercury monitoring system must...

  11. 40 CFR Table 8 to Subpart IIIii of... - Requirements for Cell Room Monitoring Program

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true Requirements for Cell Room Monitoring... Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII, Table 8 Table 8 to Subpart IIIII of Part 63—Requirements for Cell Room Monitoring Program As stated in § 63.8192(g)(1), your mercury monitoring system must...

  12. 40 CFR Table 8 to Subpart IIIii of... - Requirements for Cell Room Monitoring Program

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false Requirements for Cell Room Monitoring... Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII, Table 8 Table 8 to Subpart IIIII of Part 63—Requirements for Cell Room Monitoring Program As stated in § 63.8192(g)(1), your mercury monitoring system must...

  13. Why evolutionary biologists should get seriously involved in ecological monitoring and applied biodiversity assessment programs

    PubMed Central

    Brodersen, Jakob; Seehausen, Ole

    2014-01-01

    While ecological monitoring and biodiversity assessment programs are widely implemented and relatively well developed to survey and monitor the structure and dynamics of populations and communities in many ecosystems, quantitative assessment and monitoring of genetic and phenotypic diversity that is important to understand evolutionary dynamics is only rarely integrated. As a consequence, monitoring programs often fail to detect changes in these key components of biodiversity until after major loss of diversity has occurred. The extensive efforts in ecological monitoring have generated large data sets of unique value to macro-scale and long-term ecological research, but the insights gained from such data sets could be multiplied by the inclusion of evolutionary biological approaches. We argue that the lack of process-based evolutionary thinking in ecological monitoring means a significant loss of opportunity for research and conservation. Assessment of genetic and phenotypic variation within and between species needs to be fully integrated to safeguard biodiversity and the ecological and evolutionary dynamics in natural ecosystems. We illustrate our case with examples from fishes and conclude with examples of ongoing monitoring programs and provide suggestions on how to improve future quantitative diversity surveys. PMID:25553061

  14. The Savannah River Site`s groundwater monitoring program. First quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results.

  15. Monitoring the condition of natural resources in US national parks.

    PubMed

    Fancy, S G; Gross, J E; Carter, S L

    2009-04-01

    The National Park Service has developed a long-term ecological monitoring program for 32 ecoregional networks containing more than 270 parks with significant natural resources. The monitoring program assists park managers in developing a broad-based understanding of the status and trends of park resources as a basis for making decisions and working with other agencies and the public for the long-term protection of park ecosystems. We found that the basic steps involved in planning and designing a long-term ecological monitoring program were the same for a range of ecological systems including coral reefs, deserts, arctic tundra, prairie grasslands, caves, and tropical rainforests. These steps involve (1) clearly defining goals and objectives, (2) compiling and summarizing existing information, (3) developing conceptual models, (4) prioritizing and selecting indicators, (5) developing an overall sampling design, (6) developing monitoring protocols, and (7) establishing data management, analysis, and reporting procedures. The broad-based, scientifically sound information obtained through this systems-based monitoring program will have multiple applications for management decision-making, research, education, and promoting public understanding of park resources. When combined with an effective education program, monitoring results can contribute not only to park issues, but also to larger quality-of-life issues that affect surrounding communities and can contribute significantly to the environmental health of the nation.

  16. Clinician impression versus prescription drug monitoring program criteria in the assessment of drug-seeking behavior in the emergency department.

    PubMed

    Weiner, Scott G; Griggs, Christopher A; Mitchell, Patricia M; Langlois, Breanne K; Friedman, Franklin D; Moore, Rebecca L; Lin, Shuo Cheng; Nelson, Kerrie P; Feldman, James A

    2013-10-01

    We compare emergency provider impression of drug-seeking behavior with objective criteria from a state prescription drug monitoring program, assess change in opioid pain reliever prescribing after prescription drug monitoring program review, and examine clinical factors associated with suspected drug-seeking behavior. This was a prospective observational study of emergency providers assessing a convenience sample of patients aged 18 to 64 years who presented to either of 2 academic medical centers with chief complaint of back pain, dental pain, or headache. Drug-seeking behavior was objectively defined as present when a patient had greater than or equal to 4 opioid prescriptions by greater than or equal to 4 providers in the 12 months before emergency department evaluation. Emergency providers completed data forms recording their impression of the likelihood of drug-seeking behavior, patient characteristics, and plan for prescribing pre- and post-prescription drug monitoring program review. Descriptive statistics were generated. We calculated agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program definition, and sensitivity, specificity, and positive predictive value of emergency provider impression, using prescription drug monitoring program criteria as the criterion standard. A multivariate logistic regression analysis was conducted to determine clinical factors associated with drug-seeking behavior. Thirty-eight emergency providers with prescription drug monitoring program access participated. There were 544 patient visits entered into the study from June 2011 to January 2013. There was fair agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program (κ=0.30). Emergency providers had sensitivity 63.2% (95% confidence interval [CI] 54.8% to 71.7%), specificity 72.7% (95% CI 68.4% to 77.0%), and positive predictive value 41.2% (95% CI 34.4% to 48.2%) for identifying drug-seeking behavior. After exposure to prescription drug monitoring program data, emergency providers changed plans to prescribe opioids at discharge in 9.5% of cases (95% CI 7.3% to 12.2%), with 6.5% of patients (n=35) receiving opioids not previously planned and 3.0% (n=16) no longer receiving opioids. Predictors for drug-seeking behavior by prescription drug monitoring program criteria were patient requests opioid medications by name (odds ratio [OR] 1.91; 95% CI 1.13 to 3.23), multiple visits for same complaint (OR 2.5; 95% CI 1.49 to 4.18), suspicious history (OR 1.88; 95% CI 1.1 to 3.19), symptoms out of proportion to examination (OR 1.83; 95% CI 1.1 to 3.03), and hospital site (OR 3.1; 95% CI 1.76 to 5.44). Emergency providers had fair agreement with objective criteria from the prescription drug monitoring program in suspecting drug-seeking behavior. Program review changed management plans in a small number of cases. Multiple clinical factors were predictive of drug-seeking behavior. Copyright © 2013 American College of Emergency Physicians. Published by Mosby, Inc. All rights reserved.

  17. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM: CURRENT STATUS OF VIRGINIAN PROVINCE (U.S.) ESTUARIES

    EPA Science Inventory

    Monitoring of indicators of the ecological condition of bays, tidal rivers, and estuaries within the Virginian Biogeographic Province (Cape Cod, Massachusetts to Cape Henry, Virginia) was conducted annually by the U.S. EPA's Environmental Monitoring and Assessment Program (EMAP) ...

  18. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  19. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  20. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  1. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  2. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  3. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  4. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  5. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  6. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  7. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  8. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  9. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  10. 40 CFR 257.24 - Detection monitoring program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Disposal Units Ground-Water Monitoring and Corrective Action § 257.24 Detection monitoring program. (a... unit; (ii) The mobility, stability, and persistence of waste constituents or their reaction products in... constituents, and reaction products in the ground water; and (iv) The concentration or values and coefficients...

  11. Revised ground-water monitoring compliance plan for the 300 area process trenches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less

  12. A framework for assessment and monitoring of small mammals in a lowland tropical forest.

    PubMed

    Solari, Sergio; Rodriguez, Juan José; Vivar, Elena; Velazco, Paul M

    2002-05-01

    Development projects in tropical forests can impact biodiversity. Assessment and monitoring programs based on the principles of adaptive management assist managers to identify and reduce such impacts. The small mammal community is one important component of a forest ecosystem that may be impacted by development projects. In 1996, a natural gas exploration project was initiated in a Peruvian rainforest. The Smithsonian Institution's Monitoring and Assessment of Biodiversity program cooperated with Shell Prospecting and Development Peru to establish an adaptive management program to protect the region's biodiversity. In this article, we discuss the role of assessing and monitoring small mammals in relation to the natural gas project. We outline the conceptual issues involved in establishing an assessment and monitoring program, including setting objectives, evaluating the results and making appropriate decisions. We also summarize the steps taken to implement the small mammal assessment, provide results from the assessment and discuss protocols to identify appropriate species for monitoring.

  13. Mobile-Based Nutrition and Child Health Monitoring to Inform Program Development: An Experience From Liberia.

    PubMed

    Guyon, Agnes; Bock, Ariella; Buback, Laura; Knittel, Barbara

    2016-12-23

    Implementing complex nutrition and other public health projects and tracking nutrition interventions, such as women's diet and supplementation and infant and young child feeding practices, requires reliable routine data to identify potential program gaps and to monitor trends in behaviors in real time. However, current monitoring and evaluation practices generally do not create an environment for this real-time tracking. This article describes the development and application of a mobile-based nutrition and health monitoring system, which collected monitoring data on project activities, women's nutrition, and infant and young child feeding practices in real time. The Liberia Agricultural Upgrading Nutrition and Child Health (LAUNCH) project implemented a nutrition and health monitoring system between April 2012 and June 2014. The LAUNCH project analyzed project monitoring and outcome data from the system and shared selected behavioral and programmatic indicators with program managers through a short report, which later evolved into a visual data dashboard, during program-update meetings. The project designed protocols to ensure representativeness of program participants. LAUNCH made programmatic adjustments in response to findings from the monitoring system; these changes were then reflected in subsequent quarterly trends, indicating that the availability of timely data allowed for the project to react quickly to issues and adapt the program appropriately. Such issues included lack of participation in community groups and insufficient numbers of food distribution points. Likewise, the system captured trends in key outcome indicators such as breastfeeding and complementary feeding practices, linking them to project activities and external factors including seasonal changes and national health campaigns. Digital data collection platforms can play a vital role in improving routine programmatic functions. Fixed gathering locations such as food distribution points represent an opportunity to easily access program participants and enable managers to identify strengths and weaknesses in project implementation. For programs that track individuals over time, a mobile tool combined with a strong database can greatly improve efficiency and data visibility and reduce resource leakages. © Guyon et al.

  14. A home monitoring program including real-time wireless home spirometry in idiopathic pulmonary fibrosis: a pilot study on experiences and barriers.

    PubMed

    Moor, C C; Wapenaar, M; Miedema, J R; Geelhoed, J J M; Chandoesing, P P; Wijsenbeek, M S

    2018-05-29

    In idiopathic pulmonary fibrosis (IPF), home monitoring experiences are limited, not yet real-time available nor implemented in daily care. We evaluated feasibility and potential barriers of a new home monitoring program with real-time wireless home spirometry in IPF. Ten patients with IPF were asked to test this home monitoring program, including daily home spirometry, for four weeks. Measurements of home and hospital spirometry showed good agreement. All patients considered real-time wireless spirometry useful and highly feasible. Both patients and researchers suggested relatively easy solutions for the identified potential barriers regarding real-time home monitoring in IPF.

  15. Successful water quality monitoring: The right combination of intent, measurement, interpretation, and a cooperating ecosystem

    USGS Publications Warehouse

    Soballe, D.M.

    1998-01-01

    Water quality monitoring is invaluable to ensure compliance with regulations, detect trends or patterns, and advance ecological understanding. However, monitoring typically measures only a few characteristics in a small fraction of a large and complex system, and thus the information contained in monitoring data depends upon which features of the ecosystem are actually captured by the measurements. Difficulties arise when these data contain something other than intended, but this can be minimized if the purpose of the sampling is clear, and the sampling design, measurements, and data interpretations are all compatible with this purpose. The monitoring program and data interpretation must also be properly matched to the structure and functioning of the system. Obtaining this match is sometimes an iterative process that demands a close link between research and monitoring. This paper focuses on water quality monitoring that is intended to track trends in aquatic resources and advance ecological understanding. It includes examples from three monitoring programs and a simulation exercise that illustrate problems that arise when the information content of monitoring data differs from expectation. The examples show (1) how inconsistencies among, or lack of information about, the basic elements of a monitoring program (intent, design, measurement, interpretation, and the monitored system) can produce a systematic difference (bias) between monitoring measurements and sampling intent or interpretation, and (2) that bias is not just a statistical consideration, but an insidious problem that can undermine the scientific integrity of a monitoring program. Some general suggestions are provided and hopefully these examples will help those engaged in water quality monitoring to enhance and protect the value of their monitoring investment.

  16. Education for worksite monitors of impaired nurses.

    PubMed

    Young, Linda J

    2008-01-01

    Boards of nursing sponsor programs, including those for alternatives to discipline, for recovering nurses. These programs rely on worksite monitors who are oftentimes other nurses or supervisors of nurses, to work with recovering nurses when they return to practice. The skills of these monitors vary with respect to understanding the monitor role and recognizing traits in chemical dependency and relapse. To determine the degree of content value and the best teaching method for monitors to learn program content, 17 currently active worksite monitors participated in a study to evaluate content value to 2 groups, new and experienced monitors, and to select the best method to teach 4 content topics. Results showed that current content was valued without necessary additions and that group instruction in urban areas was preferred over one-to-one instruction. Implementation of study outcomes yielded that issues of confidentiality made group instruction unsatisfactory.

  17. A Two-Year Water Quality Monitoring Curriculum.

    ERIC Educational Resources Information Center

    Glazer, Richard B.; And Others

    The Environmental Protection Agency developed this curriculum to train technicians to monitor water quality. Graduates of the program should be able to monitor municipal, industrial, and commercial discharges; test drinking water for purity; and determine quality of aquatic environments. The program includes algebra, communication skills, biology,…

  18. A NATIONAL PROGRAM FOR MONITORING STREAM CONDITION IN THE WESTERN UNITED STATES

    EPA Science Inventory


    The U.S. Environmental Protection Agency recently initiated a four-year survey of streams in the Western United States as a component of the Environmental Monitoring and Assessment Program (EMAP). EMAP is developing indicators to monitor and assess the condition of ecological...

  19. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., program, subaward, function or activity supported by the award. Recipients must monitor subawards to...) Recipients must immediately notify SSA of developments that have a significant impact on the award-supported... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 435.51 Monitoring and...

  20. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., program, subaward, function or activity supported by the award. Recipients must monitor subawards to...) Recipients must immediately notify SSA of developments that have a significant impact on the award-supported... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 435.51 Monitoring and...

  1. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., program, subaward, function or activity supported by the award. Recipients must monitor subawards to...) Recipients must immediately notify SSA of developments that have a significant impact on the award-supported... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 435.51 Monitoring and...

  2. Characterization monitoring & sensor technology crosscutting program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    The purpose of the Characterization, Monitoring, and Sensor Technology Crosscutting Program (CMST-CP) is to deliver appropriate characterization, monitoring, and sensor technology (CMST) to the OFfice of Waste Management (EM-30), the Office of Environmental Restoration (EM-40), and the Office of Facility Transition and Management (EM-60).

  3. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  4. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  5. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  6. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  7. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  8. Enhancement of Self-Monitoring in a Web-Based Weight Loss Program by Extra Individualized Feedback and Reminders: Randomized Trial

    PubMed Central

    Hutchesson, Melinda Jane; Tan, Chor Yin; Morgan, Philip; Callister, Robin

    2016-01-01

    Background Self-monitoring is an essential behavioral strategy for effective weight loss programs. Traditionally, self-monitoring has been achieved using paper-based records. However, technology is now more frequently used to deliver treatment programs to overweight and obese adults. Information technologies, such as the Internet and mobile phones, allow innovative intervention features to be incorporated into treatment that may facilitate greater adherence to self-monitoring processes, provide motivation for behavior change, and ultimately lead to greater weight loss success. Objective The objective of our study was to determine whether the consistency of self-monitoring differed between participants randomly assigned to a basic or an enhanced 12-week commercial Web-based weight loss program. Methods We randomly assigned a sample of 301 adults (mean age 42.3 years; body mass index 31.3 kg/m2; female 176/301, 58.5%) to the basic or enhanced group. The basic program included tools for self-monitoring (online food and exercise diary, and a weekly weigh-in log) with some feedback and reminders to weigh in (by text or email). The enhanced program included the basic components, as well as extra individualized feedback on self-monitoring entries and reminders (by text, email, or telephone) to engage with self-monitoring tools. We evaluated the level of self-monitoring by examining the consistency of self-monitoring of food, exercise, and weight during the 12 weeks. Consistency was defined as the number of weeks during which participants completed a criterion number of entries (ie, ≥3 days of online food or exercise diary records per week and ≥1 weigh-in per week). Results The enhanced group’s consistency of use of self-monitoring tools was significantly greater than that of the basic group throughout the 12 weeks (median consistency for food 8 vs 3 weeks, respectively, P<.001; for exercise 2.5 vs 1 weeks, respectively, P=.003). Conclusions Enhanced features, including additional individualized feedback and reminders, are effective in enhancing self-monitoring behaviors in a Web-based weight loss program. ClinicalTrial Australian New Zealand Clinical Trials Registry (ANZCTR): ACTRN12610000197033; https://www.anzctr.org.au/Trial/Registration/TrialReview.aspx?id=335159 (Archived by WebCite at http://www.webcitation.org/6gCQdj21G) PMID:27072817

  9. Improved Real-Time Monitoring Using Multiple Expert Systems

    NASA Technical Reports Server (NTRS)

    Schwuttke, Ursula M.; Angelino, Robert; Quan, Alan G.; Veregge, John; Childs, Cynthia

    1993-01-01

    Monitor/Analyzer of Real-Time Voyager Engineering Link (MARVEL) computer program implements combination of techniques of both conventional automation and artificial intelligence to improve monitoring of complicated engineering system. Designed to support ground-based operations of Voyager spacecraft, also adapted to other systems. Enables more-accurate monitoring and analysis of telemetry, enhances productivity of monitoring personnel, reduces required number of such personnel by performing routine monitoring tasks, and helps ensure consistency in face of turnover of personnel. Programmed in C language and includes commercial expert-system software shell also written in C.

  10. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-B: Resource description, program history, wells tested, university and company based research, site restoration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Design well program; LaFourche Crossing; MG-T/DOE Amoco Fee No. 1 (Sweet Lake); Environmental monitoring at Sweet Lake; Air quality; Water quality; Microseismic monitoring; Subsidence; Dow/DOE L.R. Sweezy No. 1more » well; Reservoir testing; Environmental monitoring at Parcperdue; Air monitoring; Water runoff; Groundwater; Microseismic events; Subsidence; Environmental consideration at site; Gladys McCall No. 1 well; Test results of Gladys McCall; Hydrocarbons in production gas and brine; Environmental monitoring at the Gladys McCall site; Pleasant Bayou No. 2 well; Pleasant Bayou hybrid power system; Environmental monitoring at Pleasant Bayou; and Plug abandonment and well site restoration of three geopressured-geothermal test sites. 197 figs., 64 tabs.« less

  11. 1998 Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L. V. Street

    This report describes the calendar year 1998 compliance monitoring and environmental surveillance activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1998 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection ofmore » public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The INEEL complied with permits and applicable regulations, with the exception of nitrogen samples in a disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond. Data collected by the Environmental Monitoring Program demonstrate that the public health and environment were protected.« less

  12. Cure Monitoring Techniques for Adhesive Bonding Techniques.

    DTIC Science & Technology

    1980-11-01

    l TABLE OF CONTIW Section Pase I INTRODUCTION 1. Program Overviev 1 2. Smary 2 II MONITORING SYSTEM IMPROVEMENTS 3 1. Development of a...encountered in the electronics/signal/ computer interfaces, although solvable, have slowed progress and starting a bondline monitoring program to do a...AIWAL/MLBC) as Project Engineer. The program manager is Mr. C. A. May. The principal investigator is Dr. A. Wereta, Jr., assisted by Mass. W. G. Caple, J

  13. Adaptive runtime for a multiprocessing API

    DOEpatents

    Antao, Samuel F.; Bertolli, Carlo; Eichenberger, Alexandre E.; O'Brien, John K.

    2016-11-15

    A computer-implemented method includes selecting a runtime for executing a program. The runtime includes a first combination of feature implementations, where each feature implementation implements a feature of an application programming interface (API). Execution of the program is monitored, and the execution uses the runtime. Monitor data is generated based on the monitoring. A second combination of feature implementations are selected, by a computer processor, where the selection is based at least in part on the monitor data. The runtime is modified by activating the second combination of feature implementations to replace the first combination of feature implementations.

  14. Adaptive runtime for a multiprocessing API

    DOEpatents

    Antao, Samuel F.; Bertolli, Carlo; Eichenberger, Alexandre E.; O'Brien, John K.

    2016-10-11

    A computer-implemented method includes selecting a runtime for executing a program. The runtime includes a first combination of feature implementations, where each feature implementation implements a feature of an application programming interface (API). Execution of the program is monitored, and the execution uses the runtime. Monitor data is generated based on the monitoring. A second combination of feature implementations are selected, by a computer processor, where the selection is based at least in part on the monitor data. The runtime is modified by activating the second combination of feature implementations to replace the first combination of feature implementations.

  15. Suggestions for planning a migration-monitoring network based on the experience of establishing and operating the maps program

    Treesearch

    David F. DeSante

    2005-01-01

    Based on the experience of creating and implementing the Monitoring Avian Productivity and Survivorship (MAPS) program, I suggest that, to be successful, a migration-monitoring network must: (1) provide strong justification for the data it proposes to collect; (2) provide direct links between those monitoring data and both research and management goals; (3) provide...

  16. Lake and bulk sampling chemistry, NADP, and IMPROVE air quality data analysis on the Bridger-Teton National Forest (USFS Region 4)

    Treesearch

    Jill Grenon; Terry Svalberg; Ted Porwoll; Mark Story

    2010-01-01

    Air quality monitoring data from several programs in and around the Bridger-Teton (B-T) National Forest - National Atmospheric Deposition Program (NADP), longterm lake monitoring, long-term bulk precipitation monitoring (both snow and rain), and Interagency Monitoring of Protected Visual Environments (IMPROVE) - were analyzed in this report. Trends were analyzed using...

  17. Vehicle speed considerations in traffic management : development of a new speed monitoring program

    DOT National Transportation Integrated Search

    2000-12-01

    The federal speed monitoring program, established in 1974 and repealed in 1995, was primarily intended to provide reliable data for inclusion in states' annual certification for Federal Aid Highway Projects. The repeal of the program not only authori...

  18. In Vivo Monitoring Program Manual, PNL-MA-574, Rev 5.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2011-09-12

    The following sections provide an overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes the organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance.

  19. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document)

    EPA Pesticide Factsheets

    Describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  20. Emerging ecological datasets with application for modeling North American dust emissions

    USDA-ARS?s Scientific Manuscript database

    In 2011 the US Bureau of Land Management (BLM) established the Assessment, Inventory and Monitoring (AIM) program to monitor the condition of BLM land and to provide data to support evidence-based management of multi-use public lands. The monitoring program shares core data collection methods with t...

  1. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...

  2. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...

  3. Coordinating a national rangeland monitoring training program: Success and lessons learned

    USDA-ARS?s Scientific Manuscript database

    One of the best ways to ensure quality of information gathered in a rangeland monitoring program is through a strong and uniform set of trainings. Curriculum development and delivery of monitoring trainings poses unique challenges that are not seen in academic settings. Participants come from a rang...

  4. Development and Progression of a Model: Prospective Research Compliance Monitoring

    ERIC Educational Resources Information Center

    Fedor, Carol; Ferrazzano Yaussy, Cristina; Cola, Philip A.

    2008-01-01

    Recent trends in Human Research Protection Programs (HRPPs) have contributed to the rising emphasis on prospective monitoring of clinical research and education programs. Therefore, internal efforts and resources to monitor investigator compliance and site performance have become an important focus in the conduct of clinical research. Once the…

  5. MONITORING CHANGES IN THE ESTUARIES OF THE UNITED STATES: THE ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM

    EPA Science Inventory

    The purpose of the Environmental Monitoring and Assessment Program/Estuaries (EMAP-E) is to estimate the current status, extent, changes, and trends in ecological indicators of the condition of the nation's coastal resources (intertidal, subtidal, and offshore) on a regional and ...

  6. 45 CFR 602.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Monitoring and reporting program performance. 602.40 Section 602.40 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... inspections and certified percentage-of-completion data are relied on heavily by Federal agencies to monitor...

  7. 45 CFR 602.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Monitoring and reporting program performance. 602.40 Section 602.40 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... inspections and certified percentage-of-completion data are relied on heavily by Federal agencies to monitor...

  8. 78 FR 35631 - Proposed Information Collection Request; Comment Request; 40 CFR Part 64 Compliance Assurance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... the fact that most facilities are now using electronic monitoring to conduct their recording, thus... Request; Comment Request; 40 CFR Part 64 Compliance Assurance Monitoring Program AGENCY: Environmental... an information collection request, ``40 CFR Part 64 Compliance Assurance Monitoring Program'' (EPA...

  9. A program downloader and other utility software for the DATAC bus monitor unit

    NASA Technical Reports Server (NTRS)

    Novacki, Stanley M., III

    1987-01-01

    A set or programs designed to facilitate software testing on the DATAC Bus Monitor is described. By providing a means to simplify program loading, firmware generation, and subsequent testing of programs, the overhead involved in software evaluation is reduced and that time is used more productively in performance, analysis and improvement of current software.

  10. Curriculum Development Based on the Big Picture Assessment of the Mechanical Engineering Program

    ERIC Educational Resources Information Center

    Sabri, Mohd Anas Mohd; Khamis, Nor Kamaliana; Tahir, Mohd Faizal Mat; Wahid, Zaliha; Kamal, Ahmad; Ihsan, Ariffin Mohd; Sulong, Abu Bakar; Abdullah, Shahrum

    2013-01-01

    One of the major concerns of the Engineering Accreditation Council (EAC) is the need for an effective monitoring and evaluation of program outcome domains that can be associated with courses taught under the Mechanical Engineering program. However, an effective monitoring method that can determine the results of each program outcome using Bloom's…

  11. The Savannah River Site's groundwater monitoring program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

  12. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  13. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  14. Enhanced surveillance strategies for detecting and monitoring chronic wasting disease in free-ranging cervids

    USGS Publications Warehouse

    Walsh, Daniel P.

    2012-01-01

    The purpose of this document is to provide wildlife management agencies with the foundation upon which they can build scientifically rigorous and cost-effective surveillance and monitoring programs for chronic wasting disease (CWD) or refine their existing programs. The first chapter provides an overview of potential demographic and spatial risk factors of susceptible wildlife populations that may be exploited for CWD surveillance and monitoring. The information contained in this chapter explores historic as well as recent developments in our understanding of CWD disease dynamics. It also contains many literature references for readers who may desire a more thorough review of the topics or CWD in general. The second chapter examines methods for enhancing efforts to detect CWD on the landscape where it is not presently known to exist and focuses on the efficiency and cost-effectiveness of the surveillance program. Specifically, it describes the means of exploiting current knowledge of demographic and spatial risk factors, as described in the first chapter, through a two-stage surveillance scheme that utilizes traditional design-based sampling approaches and novel statistical methods to incorporate information about the attributes of the landscape, environment, populations and individual animals into CWD surveillance activities. By accounting for these attributes, efficiencies can be gained and cost-savings can be realized. The final chapter is unique in relation to the first two chapters. Its focus is on designing programs to monitor CWD once it is discovered within a jurisdiction. Unlike the prior chapters that are more detailed or prescriptive, this chapter by design is considerably more general because providing comprehensive direction for creating monitoring programs for jurisdictions without consideration of their monitoring goals, sociopolitical constraints, or their biological systems, is not possible. Therefore, the authors draw upon their collective experiences implementing disease-monitoring programs to present the important questions to consider, potential tools, and various strategies for those wildlife management agencies endeavoring to create or maintain a CWD monitoring program. Its intent is to aid readers in creating efficient and cost-effective monitoring programs, while avoiding potential pitfalls. It is hoped that these three chapters will be useful tools for wildlife managers struggling to implement efficient and effective CWD disease management programs.

  15. Yucca Mountain Biological Resources Monitoring Program; Annual report, FY91

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-01-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a possible site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a repository. To ensure that site characterization activities (SCA) do not adversely affect the Yucca Mountain area, an environmental program has been implemented to monitor and mitigate potential impacts and to ensure that activities comply with applicable environmentalmore » regulations. This report describes the activities and accomplishments during fiscal year 1991 (FY91) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Activities Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.« less

  16. Lessons from a 5 yr citizen-science monitoring program, Mountain Watch, to engage hikers in air quality/visibility and plant phenology monitoring in the mountains

    NASA Astrophysics Data System (ADS)

    Murray, G.; Weihrauch, D.; Kimball, K.; McDonough, C.

    2010-12-01

    The AMC’s citizen scientist monitoring program, Mountain Watch, engages hikers in observational monitoring while recreating in the northern Appalachian Mountains. The program uses two monitoring activities:1) tracking the phenology of 11 mountain flowers species, and 2) the visitors real world perception of on-mountain visibility and its ‘quality’ with proximate monitored air quality parameters. The Mountain Watch program objectives are a) to engage and educate the public through hands-on monitoring, b) to motivate the participant to take further action towards environmental stewardship, and c) to provide supplemental data to AMC’s ongoing science-based research to further our understanding of the impact of human activity on mountain ecosystems. The Mountain Watch plant monitoring includes recording the time and location of alpine and forest plants flowering and other phenological phases using AMC field guides and datasheets. In the White Mountains of New Hampshire concurrent meteorological data, including soil temperature, is paired with the phenology observations as part of AMC’s research to develop spatial and temporal phenology models with air and soil temperature for northeastern mountains. Mountain Watch’s visibility monitoring program has hikers record visual range and rate the view at select vistas in comparison to a clear day view photo guide when visiting AMC’s backcountry huts. The results are compared to proximate air quality measurements, which assists in determining how White Mountain National Forest air quality related values and natural resources management objectives are being met. Since 2006 the Mountain Watch program has received over 3,500 citizen datasheets for plant reproductive phenology and visibility monitoring. We estimate that we have reached more than 15,000 hikers through our facility based education programming focused on air quality and phenology and field monitoring hikes. While we consider this good success in engaging hikers to date, the ratio of resource expenditures in recruiting volunteers and QA/QCing their data for actual research application has been high. Mountain Watch staff are now refining the program to achieve education and research goals a manner that is sustainable into the future with limited fiscal and staff resources. The quality of our citizen phenology observations, in comparison to staff monitoring, has lead to refinements including directing general audience hikers to well-defined trailside observation stations, growing our more skilled amateur botanist volunteer base, and use of remote cameras for quality controls and better temporal coverage. Visibility monitoring at four mountain vistas has recently been analyzed in the context of policy applications. Refinements will be presented that will further inform natural resource management of air quality in relation to Clean Air Act Air Quality Related Values and a potential visibility focused particulate matter secondary National Ambient Air Quality Standard. Overall lessons learned, regarding audience considerations, resource needs, and long-term sustainability, from our 5-year field based geoscience programs will be discussed.

  17. Prevalence of Substance Misuse in New Patients in an Outpatient Psychiatry Clinic Using a Prescription Monitoring Program

    PubMed Central

    Fellers, Jonathan C.; Raisinghani, Rachna S.; Santa Cruz, Maria R.; Hidalgo, Priscilla C.; Lee, Meredith S.; Martinez, Lady A.; Keller, Adrienne E.; Clayton, Anita H.

    2014-01-01

    Objective: To investigate the value of a prescription monitoring program in identifying prescription drug misuse among patients presenting to a resident physician outpatient psychiatry clinic at an academic medical center. Method: Participants were 314 new patients aged 18 years or older presenting to the clinic from October 2011 to June 2012. Resident physicians completed a data collection form for each participant using information from the patient interview and from the prescription monitoring program report. Prescription drug misuse was defined as having any 1 of the following 5 criteria in the prescription monitoring program report: (1) filled prescriptions for 2 or more controlled substances, (2) obtained prescriptions from 2 or more providers, (3) obtained early refills, (4) used 3 or more pharmacies, and (5) the prescription monitoring program report conflicted with the patient’s report. Results: At least 1 indicator of prescription drug misuse was found in 41.7% of patients. Over 69% of the patients that the residents believed were misusing prescription drugs actually met 1 of the criteria for prescription drug misuse. The prescription monitoring program report changed the management only 2.2% of the time. Patients with prior benzodiazepine use (χ21 = 17.68, P < .001), prior opioid use (χ21 = 19.98, P < .001), a personality disorder (χ21 = 7.22, P < .001), and chronic pain (χ21 = 14.31, P < .001) had a higher percentage of prescription drug misuse compared to patients without these factors. Conclusion: Using the prescription monitoring program to screen patients with prior benzodiazepine and opioid use, with a personality disorder, and/or with chronic pain may be useful in confirming the suspicion of prescription drug misuse identified at the initial evaluation. PMID:24940523

  18. Population size influences amphibian detection probability: implications for biodiversity monitoring programs.

    PubMed

    Tanadini, Lorenzo G; Schmidt, Benedikt R

    2011-01-01

    Monitoring is an integral part of species conservation. Monitoring programs must take imperfect detection of species into account in order to be reliable. Theory suggests that detection probability may be determined by population size but this relationship has not yet been assessed empirically. Population size is particularly important because it may induce heterogeneity in detection probability and thereby cause bias in estimates of biodiversity. We used a site occupancy model to analyse data from a volunteer-based amphibian monitoring program to assess how well different variables explain variation in detection probability. An index to population size best explained detection probabilities for four out of six species (to avoid circular reasoning, we used the count of individuals at a previous site visit as an index to current population size). The relationship between the population index and detection probability was positive. Commonly used weather variables best explained detection probabilities for two out of six species. Estimates of site occupancy probabilities differed depending on whether the population index was or was not used to model detection probability. The relationship between the population index and detectability has implications for the design of monitoring and species conservation. Most importantly, because many small populations are likely to be overlooked, monitoring programs should be designed in such a way that small populations are not overlooked. The results also imply that methods cannot be standardized in such a way that detection probabilities are constant. As we have shown here, one can easily account for variation in population size in the analysis of data from long-term monitoring programs by using counts of individuals from surveys at the same site in previous years. Accounting for variation in population size is important because it can affect the results of long-term monitoring programs and ultimately the conservation of imperiled species.

  19. Compilation of 1986 Annual Reports of the Navy ELF (Extremely Low Frequency) Communications System Ecological Monitoring Program. Volume 2. TABS D-G.

    DTIC Science & Technology

    1987-07-01

    8217. -. , i U ELF ECOLOGICAL MONITORING PROGRAM INDEX OF 1986 ANNUAL REPORTS A. Herbaceous Plant Cover and Tree Studies \\ Michigan Technological University...SUBCONTRACT NUMBER EO 6549-84-C-005 LELF Communications System Ecological Monitoring Program BIOLOGICAL STUDIES ON POLLINATING INSECTS: MEGACHILID...such as those in the vicinity of the ELF antenna because they are pollinators of flowering plants , and are therefore important to the reproductive

  20. Developing enterprise tools and capacities for large-scale natural resource monitoring: A visioning workshop

    USGS Publications Warehouse

    Bayer, Jennifer M.; Weltzin, Jake F.; Scully, Rebecca A.

    2017-01-01

    Objectives of the workshop were: 1) identify resources that support natural resource monitoring programs working across the data life cycle; 2) prioritize desired capacities and tools to facilitate monitoring design and implementation; 3) identify standards and best practices that improve discovery, accessibility, and interoperability of data across programs and jurisdictions; and 4) contribute to an emerging community of practice focused on natural resource monitoring.

  1. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  2. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  3. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  4. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  5. Wilderness monitoring and data management

    USGS Publications Warehouse

    Riebau, A. R.

    1994-01-01

    In the last decade, increased public interest in natural areas has resulted in increased monitoring activity by federal wilderness managers to assess the status of wilderness values. Wilderness values are those large-scale entities of wilderness which comprise, in sum, wilderness character. Data collected through wilderness monitoring must support the maintenance of wilderness values. Wilderness monitoring must include the development of clear data management strategies and provisions for hypothesis testing. Unfortunately, some monitoring programs do not support the status assessment of wilderness values. Often wilderness monitoring programs have neglected even the most rudimentary principles of data management. This paper presents a model for wilderness monitoring, guidelines for data management, and an overview of a PC-compatible wilderness monitoring data base, the Monitoring Information Data Analysis System (MIDAS).

  6. Overview of four prescription monitoring/review programs in Canada.

    PubMed

    Furlan, Andrea D; MacDougall, Peter; Pellerin, Denise; Shaw, Karen; Spitzig, Doug; Wilson, Galt; Wright, Janet

    2014-01-01

    Prescription monitoring or review programs collect information about prescription and dispensing of controlled substances for the purposes of monitoring, analysis and education. In Canada, it is the responsibility of the provincial institutions to organize, maintain and run such programs. To describe the characteristics of four provincial programs that have been in place for >6 years. The managers of the prescription monitoring⁄review programs of four provinces (British Columbia, Alberta, Saskatchewan and Nova Scotia) were invited to present at a symposium at the Canadian Pain Society in May 2012. In preparation for the symposium, one author collected and summarized the information. Three provinces have a mix of review and monitoring programs; the program in British Columbia is purely for review and education. All programs include controlled substances (narcotics, barbiturates and psychostimulants); however, other substances are differentially included among the programs: anabolic steroids are included in Saskatchewan and Nova Scotia; and cannabinoids are included in British Columbia and Nova Scotia. Access to the database is available to pharmacists in all provinces. Physicians need consent from patients in British Columbia, and only professionals registered with the program can access the database in Alberta. The definition of inappropriate prescribing and dispensing is not uniform. Double doctoring, double pharmacy and high-volume dispensing are considered to be red flags in all programs. There is variability among Canadian provinces in managing prescription monitoring⁄review programs.

  7. Specification and Error Pattern Based Program Monitoring

    NASA Technical Reports Server (NTRS)

    Havelund, Klaus; Johnson, Scott; Rosu, Grigore; Clancy, Daniel (Technical Monitor)

    2001-01-01

    We briefly present Java PathExplorer (JPAX), a tool developed at NASA Ames for monitoring the execution of Java programs. JPAX can be used not only during program testing to reveal subtle errors, but also can be applied during operation to survey safety critical systems. The tool facilitates automated instrumentation of a program in order to properly observe its execution. The instrumentation can be either at the bytecode level or at the source level when the source code is available. JPaX is an instance of a more general project, called PathExplorer (PAX), which is a basis for experiments rather than a fixed system, capable of monitoring various programming languages and experimenting with other logics and analysis techniques

  8. Pulse Power--A Heart Physiology Program for Children.

    ERIC Educational Resources Information Center

    Hinson, Curt

    1994-01-01

    Primary grade students at a Delaware elementary school currently participate in the Pulse Power heart physiology program. Students receive mastery instruction and use heart monitors to exercise performance throughout the 6-phase program. Data from homework and from the heart monitors identify student progress, knowledge, and cardiovascular…

  9. Monitoring Program Quality: Who and How Should It Be Done?

    ERIC Educational Resources Information Center

    Scholl, Geraldine T.; And Others

    Aspects of monitoring and evaluating programs for visually handicapped students are examined. The certification/accreditation program evaluation design is considered in terms of advantages and disadvantages. Roles of governmental (state and federal) and voluntary agencies are discussed. The functions of the National Accreditation Council of…

  10. 42 CFR § 414.1460 - Monitoring and program integrity.

    Code of Federal Regulations, 2010 CFR

    2017-10-01

    ... SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) PAYMENT FOR PART B MEDICAL AND OTHER HEALTH SERVICES Merit-Based Incentive Payment System and Alternative Payment Model Incentive § 414.1460 Monitoring and program integrity. (a) Vetting eligible clinicians prior to payment of the APM Incentive Payment. Prior to...

  11. INTEGRATED COASTAL MONITORING PROGRAM FOR THE GULF OF MEXICO

    EPA Science Inventory

    The Gulf of Mexico Program (GMP) Office in cooperation with Gulf State agencies, EPA Regions 4 and 6, EPA's Office of Water and Office of Research and Development (ORD), and the GMP principal partners are developing an integrated coastal monitoring program for the Gulf of Mexico....

  12. LiMPETS: Scientists Contributions to Coastal Protection Program for Youth

    NASA Astrophysics Data System (ADS)

    Saltzman, J.; Osborn, D. A.

    2004-12-01

    In the West Coast National Marine Sanctuaries' LiMPETS (Long-term Monitoring Experiential Training for Students), scientists have partnered with local sanctuaries to develop an educational and scientifically-based monitoring program. With different levels of commitment and interest, scientists have contributed to developing protocols that youth can successfully use to monitor coastal habitats. LiMPETS was developed to address the gap in marine science education for high school students. The team of sanctuary educators together with local scientists collaborate and compromise to develop scientifically accurate and meaningful monitoring projects. By crossing the border between scientists and educators, LiMPETS has become a rich program which provides to teachers professional development, monitoring equipment, an online database, and field support. In the Sandy Beach Monitoring Project, we called on an expert on the sand crab Emerita analoga to help us modify the protocols that she uses to monitor crabs regularly. This scientist brings inspiration to teachers at teacher workshops by explaining how the student monitoring compliments her research. The Rocky Intertidal Monitoring Project was developed by scientists at University of California at Santa Cruz with the intention of passing on this project to an informal learning center. After receiving California Sea Grant funding, the protocols used for over 30 years with undergraduates were modified for middle and high school students. With the help of teachers, classroom activities were developed to train students for fieldwork. The online database was envisioned by the scientists to house the historical data from undergraduate students while growing with new data collected middle and high school students. The support of scientists in this program has been crucial to develop a meaningful program for both youth and resource managers. The hours that a scientist contributes to this program may be minimal, a weeklong workshop or even a part-time job. The framework of resource protection agencies partnering with scientists can be replicated to monitor other natural habitats. Through LiMPETS, scientists are helping to develop scientifically literate youth who are engaged in environmental monitoring.

  13. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document with changes)

    EPA Pesticide Factsheets

    This document describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  14. Development of a novel optical remote sensing monitor for fenceline monitoring and enhancement of existing leak detection and repair programs

    EPA Science Inventory

    Manual leak detection and repair (LDAR) programs are currently implemented on a regular basis at refinery sites to limit fugitive emissions of volatile organic compounds (VOC). However, LDAR surveys can be time-consuming and are not always cost-effective. Fence line monitoring of...

  15. Volunteer Watershed Health Monitoring by Local Stakeholders: New Mexico Watershed Watch

    ERIC Educational Resources Information Center

    Fleming, William

    2003-01-01

    Volunteers monitor watershed health in more than 700 programs in the US, involving over 400,000 local stakeholders. New Mexico Watershed Watch is a student-based watershed monitoring program sponsored by the state's Department of Game and Fish which provides high school teachers and students with instruction on methods for water quality…

  16. Combining accuracy assessment of land-cover maps with environmental monitoring programs

    Treesearch

    Stephen V. Stehman; Raymond L. Czaplewski; Sarah M. Nusser; Limin Yang; Zhiliang Zhu

    2000-01-01

    A scientifically valid accuracy assessment of a large-area, land-cover map is expensive. Environmental monitoring programs offer a potential source of data to partially defray the cost of accuracy assessment while still maintaining the statistical validity. In this article, three general strategies for combining accuracy assessment and environmental monitoring...

  17. Guidelines for designing short-term bird monitoring projects

    Treesearch

    Jonathan Bart

    2005-01-01

    The Coordinated Bird Monitoring Program (Bart and Ralph, this volume) program is helping biologists around the country design short-term monitoring projects for birds. We have found that addressing a series of questions (table 1), in a systematic way, helps insure that projects are well planned. The process is being used by several States and...

  18. The need for a North American coordinated bird monitoring program

    Treesearch

    Jonathan Bart; Ralph C. John

    2005-01-01

    Bird monitoring is at a crossroads. While monitoring programs have existed in North America for nearly a century, recent political, biological, sociological, and economic changes necessitate a new and more efficient approach. Fortunately we now have tools available to meet the demands, including powerful coalitions of the willing within agencies, organizations, and...

  19. Environmental Monitoring at the Savannah River Plant, Annual Report - 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, C.

    2001-07-26

    An environmental monitoring program has been in existence at SRP since 1951. The original preoperational surveys have evolved into an extensive environmental monitoring program in which sample types from approximately 500 locations are analyzed for radiological and/or nonradiological parameters. The results of these analyses for 1981 are presented in this report.

  20. Monitoring California's hardwood rangelands using remotely sensed data

    Treesearch

    Chris S. Fischer; Lisa M. Levien

    2002-01-01

    As human and natural forces continue to alter the hardwood landscape, resource agencies, county planners and local interest groups find it increasingly important to monitor and assess these alterations. The California Land Cover Mapping and Monitoring Program (LCMMP), a cooperative program between the USDA Forest Service and the California Department of Forestry and...

  1. Documentation of the data analysis system for the gamma ray monitor aboard OSO-H

    NASA Technical Reports Server (NTRS)

    Croteau, S.; Buck, A.; Higbie, P.; Kantauskis, J.; Foss, S.; Chupp, D.; Forrest, D. J.; Suri, A.; Gleske, I.

    1973-01-01

    The programming system is presented which was developed to prepare the data from the gamma ray monitor on OSO-7 for scientific analysis. The detector, data, and objectives are described in detail. Programs presented include; FEEDER, PASS-1, CAL1, CAL2, PASS-3, Van Allen Belt Predict Program, Computation Center Plot Routine, and Response Function Programs.

  2. An Examination of the Concept and Role of Program Monitoring and Evaluation.

    ERIC Educational Resources Information Center

    Sherwood-Fabre, Liese

    This paper examines the concepts of program monitoring and program evaluation in the literature, and offers working definitions based on two dimensions of measurement: focus (what questions are addressed) and timing (how often the measures are taken). Focus can be on inputs to the program or outcomes from it; timing can be one-shot or continuous.…

  3. Comprehensive Monitoring Program: Air Quality Data Assessment Report for FY90. Volume 2. Version 3.1

    DTIC Science & Technology

    1991-09-01

    91311R01 If VERSION 3.10) VOLUME II Comm 2ND COPY COMPREHENSIVE MONITORING PROGRAM Contract Number DAAAI5-87-0095 AIR QUALITY DATA ASSESSMENT REPORT...MONITORING PROGRAM. FINAL AIR QUALITY DATA ASSESSMENT REPORT FOR FY90, VERSION 3.1 NONE 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRES.S(S) 8...RELEASE; DISTRIBUTION IS UNLIMITED 13. ABSTRACT (Maximum 200 words) THE OBJECTIVE OF THIS CMP IS TO: VERIFY AND EVALUATE POTENTIAL AIR QUALITY HEALTH

  4. Compilation of 1989 Annual Reports of the Navy ELF Communications System Ecological Monitoring Program. Volume 2. Tabs C-F

    DTIC Science & Technology

    1990-08-01

    in ecological communities such as those in the vicinity of the ELF antenna because they are pollinators of flowering plants , and are therefore...I I IITRI E06620-4 Page v I I ELF COMMUNICATIONS SYSTEM ECOLOGICAL MONITORING PROGRAM I INDEX OF 1989 ANNUAL REPORTS I A. Herbaceous Plant Cover and...Communications System Ecological Monitoring Program; BIOLOGICAL STUDIES ON POLLINATING INSECTS: MEGACHILID BEES Reporting year: 11/1/88 - 10/31/89 5 Prepared by

  5. Compilation of 1987 Annual Reports of the Navy ELF (Extremely Low Frequency) Communications System Ecological Monitoring Program. Volume 2

    DTIC Science & Technology

    1988-08-01

    such as those in the vicinity of the ELF antenna because they are pollinators of flowering plants , and are therefore important to the reproductive...COPY r- Compilation of 1987 Annual Reports o of the Navy ELF Communications System C4 Ecological Monitoring Program Volume 2 of 3 Volumes: TABS D -G...Security Classification) Compilation of 1987 Annual Reports of the Navy ELF Communications System Ecological Monitoring Program (Volume 2 of 3 Volumes

  6. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  7. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  8. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  9. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  10. Heat stress management program improving worker health and operational effectiveness: a case study.

    PubMed

    Huss, Rosalyn G; Skelton, Scott B; Alvis, Kimberly L; Shane, Leigh A

    2013-03-01

    Heat stress monitoring is a vital component of an effective health and safety program when employees work in exceptionally warm environments. Workers at hazardous waste sites often wear personal protective equipment (PPE), which increases the body heat stress load. No specific Occupational Safety and Health Administration (OSHA) regulations address heat stress; however, OSHA does provide several guidance documents to assist employers in addressing this serious workplace health hazard. This article describes a heat stress and surveillance plan implemented at a hazardous waste site as part of the overall health and safety program. The PPE requirement for work at this site, coupled with extreme environmental temperatures, made heat stress a significant concern. Occupational health nurses and industrial hygienists developed a monitoring program for heat stress designed to prevent the occurrence of significant heat-related illness in site workers. The program included worker education on the signs of heat-related illness and continuous physiologic monitoring to detect early signs of heat-related health problems. Biological monitoring data were collected before workers entered the exclusion zone and on exiting the zone following decontamination. Sixty-six site workers were monitored throughout site remediation. More than 1,700 biological monitoring data points were recorded. Outcomes included improved worker health and safety, and increased operational effectiveness. Copyright 2013, SLACK Incorporated.

  11. Lake Roosevelt Fisheries Monitoring Program; 1988-1989 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peone, Tim L.; Scholz, Allan T.; Griffith, James R.

    1990-10-01

    In the Northwest Power Planning Council's 1987 Columbia River Basin Fish and Wildlife Program (NPPC 1987), the Council directed the Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries as partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam [Section 903 (g)(l)(C)]. The hatcheries will produce kokanee salmon for outplanting into Lake Roosevelt as well as rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen program. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. Themore » monitoring program included the following components: (1) a year-round, reservoir-wide, creel survey to determine angler use, catch rates and composition, and growth and condition of fish; (2) assessment of kokanee, rainbow, and walleye (Stizostedion vitreum) feeding habits and densities of their preferred prey, and; (3) a mark and recapture study designed to assess the effectiveness of different locations where hatchery-raised kokanee and net pen reared rainbow trout are released. The above measures were adopted by the Council based on a management plan, developed by the Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and National Park Service, that examined the feasibility of restoring and enhancing Lake Roosevelt fisheries (Scholz et al. 1986). In July 1988, BPA entered into a contract with the Spokane Indian Tribe to initiate the monitoring program. The projected duration of the monitoring program is through 1995. This report contains the results of the monitoring program from August 1988 to December 1989.« less

  12. 7 CFR 3431.24 - Reporting requirements, monitoring, and close-out.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSTITUTE OF FOOD AND AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the Veterinary Medicine Loan Repayment Program § 3431.24 Reporting requirements, monitoring, and close-out. VMLRP...

  13. Climate and Health Co-Benefits in Low-Income Countries: A Case Study of Carbon Financed Water Filters in Kenya and a Call for Independent Monitoring

    PubMed Central

    Pickering, Amy J.; Arnold, Benjamin F.; Dentz, Holly N.; Colford, John M.; Null, Clair

    2016-01-01

    Background: The recent global climate agreement in Paris aims to mitigate greenhouse gas emissions while fostering sustainable development and establishes an international trading mechanism to meet this goal. Currently, carbon offset program implementers are allowed to collect their own monitoring data to determine the number of carbon credits to be awarded. Objectives: We summarize reasons for mandating independent monitoring of greenhouse gas emission reduction projects. In support of our policy recommendations, we describe a case study of a program designed to earn carbon credits by distributing almost one million drinking water filters in rural Kenya to avert the use of fuel for boiling water. We compare results from an assessment conducted by our research team in the program area among households with pregnant women or caregivers in rural villages with low piped water access with the reported program monitoring data and discuss the implications. Discussion: Our assessment in Kenya found lower levels of household water filter usage than the internal program monitoring reported estimates used to determine carbon credits; we found 19% (n = 4,041) of households reported filter usage 2–3 years after filter distribution compared to the program stated usage rate of 81% (n = 14,988) 2.7 years after filter distribution. Although carbon financing could be a financially sustainable approach to scale up water treatment and improve health in low-income settings, these results suggest program effectiveness will remain uncertain in the absence of requiring monitoring data be collected by third-party organizations. Conclusion: Independent monitoring should be a key requirement for carbon credit verification in future international carbon trading mechanisms to ensure programs achieve benefits in line with sustainable development goals. Citation: Pickering AJ, Arnold BF, Dentz HN, Colford JM Jr., Null C. 2017. Climate and health co-benefits in low-income countries: a case study of carbon financed water filters in Kenya and a call for independent monitoring. Environ Health Perspect 125:278–283; http://dx.doi.org/10.1289/EHP342 PMID:27634098

  14. Climate and Health Co-Benefits in Low-Income Countries: A Case Study of Carbon Financed Water Filters in Kenya and a Call for Independent Monitoring.

    PubMed

    Pickering, Amy J; Arnold, Benjamin F; Dentz, Holly N; Colford, John M; Null, Clair

    2017-03-01

    The recent global climate agreement in Paris aims to mitigate greenhouse gas emissions while fostering sustainable development and establishes an international trading mechanism to meet this goal. Currently, carbon offset program implementers are allowed to collect their own monitoring data to determine the number of carbon credits to be awarded. We summarize reasons for mandating independent monitoring of greenhouse gas emission reduction projects. In support of our policy recommendations, we describe a case study of a program designed to earn carbon credits by distributing almost one million drinking water filters in rural Kenya to avert the use of fuel for boiling water. We compare results from an assessment conducted by our research team in the program area among households with pregnant women or caregivers in rural villages with low piped water access with the reported program monitoring data and discuss the implications. Our assessment in Kenya found lower levels of household water filter usage than the internal program monitoring reported estimates used to determine carbon credits; we found 19% ( n = 4,041) of households reported filter usage 2-3 years after filter distribution compared to the program stated usage rate of 81% ( n = 14,988) 2.7 years after filter distribution. Although carbon financing could be a financially sustainable approach to scale up water treatment and improve health in low-income settings, these results suggest program effectiveness will remain uncertain in the absence of requiring monitoring data be collected by third-party organizations. Independent monitoring should be a key requirement for carbon credit verification in future international carbon trading mechanisms to ensure programs achieve benefits in line with sustainable development goals. Citation: Pickering AJ, Arnold BF, Dentz HN, Colford JM Jr., Null C. 2017. Climate and health co-benefits in low-income countries: a case study of carbon financed water filters in Kenya and a call for independent monitoring. Environ Health Perspect 125:278-283; http://dx.doi.org/10.1289/EHP342.

  15. ACS Internal CTE Monitor and Short Darks

    NASA Astrophysics Data System (ADS)

    Ogaz, Sara

    2013-10-01

    This is a continuation of Program 13156 and is to be executed once a cycle for internal CTE and short darks, respectively.INTERNAL CTE MONITOR:The charge transfer efficiency {CTE} of the ACS CCD detectors will decline as damage due to on-orbit radiation exposure accumulates. This degradation will be monitored once a cycle to determine the useful lifetime of the CCDs. All the data for this program is acquired using internal targets {lamps} only, so all of the exposures should be taken during Earth occultation time {but not during SAA passages}. This program emulates the ACS pre-flight ground calibration and post-launch SMOV testing {program 8948}, so that results from each epoch can be directly compared. Extended Pixel Edge Response {EPER} data will be obtained over a range of signal levels for the Wide Field Channel {WFC}. The signal levels are 125, 500, 1620, 5000, 10000, and 60000 electrons at gain 2.Since Cycle 18, this monitoring program was reduced {compared to 11881} considering that there is also an external CTE monitoring program.SHORT DARKS:To improve the pixel-based CTE model at signals below 10 DN, short dark frames are needed to obtain a statistically useful sample of clean, warm pixel trails. This program obtains a set of dark frames for each of the following exposure times: 66 s {60 s for some subarrays} and 339 s. These short darks and the 1040 s darks obtained from the CCD Daily Monitor will sample warm and hot pixels over logarithmically increasing brightness. Subarray short darks were added in Cycle 19 to study CTE tails in different subarray readout modes.

  16. The environmental audit. I. Concepts

    NASA Astrophysics Data System (ADS)

    Schaeffer, David J.; Kerster, Harold W.; Perry, James A.; Cox, David K.

    1985-05-01

    Extensive criticism of water quality monitoring programs has developed as costs are compared with the benefits produced by monitoring efforts. Collecting water quality data while developing understanding of the functional character of the environment will improve water quality monitoring data utility in environmental management. The “environmental audit” characterizes the attributes of the natural environment (that is, attribute type, intensity, and variability), providing a theoretical as well as practical foundation for data interpretation. In the view proposed here, traditional monitoring means the very narrow activity of collecting samples and perhaps analyzing them and storing the analyses. In the environmental audit, these activities are a mechanism to systematically improve environmental monitoring and assessment by improving the design and implementation of environmental programs. Major reasons why existing programs fail to meet the needs of legislators, regulators, and conservationists are identified.

  17. Mapping the information landscape: Discerning peaks and valleys for ecological monitoring

    USGS Publications Warehouse

    Moniz, L.J.; Nichols, J.D.; Nichols, J.M.

    2007-01-01

    We investigate previously unreported phenomena that have a potentially significant impact on the design of surveillance monitoring programs for ecological systems. Ecological monitoring practitioners have long recognized that different species are differentially informative of a system?s dynamics, as codified in the well-known concepts of indicator or keystone species. Using a novel combination of analysis techniques from nonlinear dynamics, we describe marked variation among spatial sites in information content with respect to system dynamics in the entire region. We first observed these phenomena in a spatially extended predator?prey model, but we observed strikingly similar features in verified water-level data from a NOAA/NOS Great Lakes monitoring program. We suggest that these features may be widespread and the design of surveillance monitoring programs should reflect knowledge of their existence.

  18. Seven Q-Tracks monitors of laboratory quality drive general performance improvement: experience from the College of American Pathologists Q-Tracks program 1999-2011.

    PubMed

    Meier, Frederick A; Souers, Rhona J; Howanitz, Peter J; Tworek, Joseph A; Perrotta, Peter L; Nakhleh, Raouf E; Karcher, Donald S; Bashleben, Christine; Darcy, Teresa P; Schifman, Ron B; Jones, Bruce A

    2015-06-01

    Many production systems employ standardized statistical monitors that measure defect rates and cycle times, as indices of performance quality. Clinical laboratory testing, a system that produces test results, is amenable to such monitoring. To demonstrate patterns in clinical laboratory testing defect rates and cycle time using 7 College of American Pathologists Q-Tracks program monitors. Subscribers measured monthly rates of outpatient order-entry errors, identification band defects, and specimen rejections; median troponin order-to-report cycle times and rates of STAT test receipt-to-report turnaround time outliers; and critical values reporting event defects, and corrected reports. From these submissions Q-Tracks program staff produced quarterly and annual reports. These charted each subscriber's performance relative to other participating laboratories and aggregate and subgroup performance over time, dividing participants into best and median performers and performers with the most room to improve. Each monitor's patterns of change present percentile distributions of subscribers' performance in relation to monitoring durations and numbers of participating subscribers. Changes over time in defect frequencies and the cycle duration quantify effects on performance of monitor participation. All monitors showed significant decreases in defect rates as the 7 monitors ran variously for 6, 6, 7, 11, 12, 13, and 13 years. The most striking decreases occurred among performers who initially had the most room to improve and among subscribers who participated the longest. All 7 monitors registered significant improvement. Participation effects improved between 0.85% and 5.1% per quarter of participation. Using statistical quality measures, collecting data monthly, and receiving reports quarterly and yearly, subscribers to a comparative monitoring program documented significant decreases in defect rates and shortening of a cycle time for 6 to 13 years in all 7 ongoing clinical laboratory quality monitors.

  19. Stormwater runoff water quality evaluation and management program for hazardous chemical sites: Development issues

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, G.F.; Jones-Lee, A.

    1998-12-31

    The deficiencies in the typical stormwater runoff water quality monitoring from hazardous chemical sites and an alternative approach (Evaluation Monitoring) for monitoring that shifts the monitoring program from periodic sampling and analysis of stormwater runoff for a suite of chemical parameters to examining the receiving waters to determine what, if any, water quality use impairments are occurring due to the runoff-associated constituents is presented in this paper. Rather than measuring potentially toxic constituents such as heavy metals in runoff, the monitoring program determines whether there is aquatic life toxicity in the receiving waters associated with the stormwater runoff. If toxicitymore » is found, its cause is determined and the source of the constituents causing the toxicity is identified through forensic analysis. Based on this information, site-specific, technically valid stormwater runoff management programs can be developed that will control real water quality impacts caused by stormwater runoff-associated constituents.« less

  20. Birds in Hawai'i Volcanoes National Park: Summary of the 2010 inventory and monitoring program survey

    USGS Publications Warehouse

    Camp, Richard J.; Judge, Seth W.; Hart, Patrick J.; Kudray, Greg; Gaudioso, Jacqueline M.; Hsu, Bobby H.

    2012-01-01

    The National Park Service (NPS) created the Inventory and Monitoring (I&M) Program in 1998 to establish baseline information and assess long-term trends in "vital signs" or key abiotic and biotic elements of National Parks (Fancy et al. 2009). The Pacific Island Network of the I&M Program developed a Landbirds Monitoring Protocol (LMP; Camp et al. 2011) to estimate species-specific status and monitor longterm trends in landbird distribution and abundance. Parks included in the LMP that harbor habitat critically important to native forest birds are Haleakala National Park (Maui Island), Hawai'i Volcanoes National Park (HAVO; Hawai'i Island), and the National Park of American Samoa (American Samoa). In 2010, the LMP was implemented in HAVO to survey landbird density and abundance. This implementation was the first anywhere in the Pacific Islands by the I&M Program, and continued monitoring is planned every five years in all three parks.

  1. Ambient Monitoring Technology Information Center (AMTIC)

    EPA Pesticide Factsheets

    This site contains information on ambient air quality monitoring programs, monitoring methods, quality assurance and control procedures, and federal regulations related to ambient air quality monitoring.

  2. Designing and implementing a monitoring program and the standards for conducting point counts

    Treesearch

    C. John Ralph

    1993-01-01

    Choosing between the apparent plethora of methods for monitoring bird populations is a dilemma for a person contemplating beginning a monitoring program. Cooperrider et al. (1986) and Koskimies and Vaisanen (1991) describe many methods. In the Americas, three methods have been suggested as standard (Butcher 1992). They are: point counts for determining habitat...

  3. A Planning Approach for Developing Inventory and Monitoring Programs In National Parks

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...

  4. National best management practices monitoring summary report, program phase-in period fiscal years 2013-2014

    Treesearch

    Joan Carlson; Pam Edwards; Todd Ellsworth; Michael Eberle

    2015-01-01

    The National BMP Program provides National Core BMPs, standardized monitoring protocols to evaluate implementation and effectiveness of the National Core BMPs, and a data management system to store and analyze the resulting monitoring data. BMP evaluations are completed by interdisciplinary teams of resource specialists and include assessments of whether BMP...

  5. Rocky Flats Plant Site Environmental Report for 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cirrincione, D.A.; Erdmann, N.L.

    1992-12-31

    The Rocky Rats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population.

  6. Critical loads and levels: Leveraging existing monitoring data

    Treesearch

    D. G. Fox; A. R. Riebau; R. Fisher

    2006-01-01

    A snapshot of current air quality in the National Parks and Wilderness areas of the US is presented based on data from the 165 site Interagency Monitoring of Protected Visual Environments, or IMPROVE program, and other relevant air quality monitoring programs. This snapshot is provided using the VIEWS web service, an on-line web-based data warehouse, analysis, and...

  7. Strategies for the conservation monitoring of resident landbirds and wintering neotropical migrants in the Americas

    Treesearch

    Steven C. Latta; C. John Ralph; Geoffrey R. Geupel

    2005-01-01

    Many international, regional, and local partner organizations have agreed in the need to establish long-term bird monitoring and research programs in the Americas. However, the challenge of developing national or international monitoring programs is difficult often because of the lack of qualified biologists or other resources in key regions. More fundamentally,...

  8. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  9. Fact Sheets about the Fourth Unregulated Contaminant Monitoring Rule (UCMR 4)

    EPA Pesticide Factsheets

    Fact Sheets explaining the program, contaminants for monitoring, water systems applicable, timeframe & monitoring frequency, monitoring locations, critical requirements, data elements and where to find additional information on monitoring data.

  10. INEL Geothermal Environmental Program. Final environmental report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thurow, T.L.; Cahn, L.S.

    1982-09-01

    An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs aremore » summarized.« less

  11. Federal Environmental Monitoring: Will the Bubble Burst?

    ERIC Educational Resources Information Center

    Miller, Stan

    1978-01-01

    A quality assurance program for environmental monitoring is identified as necesary for the collection of reliable, interchangeable, and legally defensible data. The article defines quality assurance and describes the EPA quality assurance program. (MA)

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Virginia L. Finley

    The purpose of this report is to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and nonradioactive pollutants (if any) that are added to the environment as a result of the Princeton Plasma Physics Laboratory's (PPPL) operations. The results of the 2001 environmental surveillance and monitoring program for PPPL are presented and discussed. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2001. PPPL has engaged in fusion energy research since 1951. The vision of the Laboratory is to create innovations to make fusion power a practicalmore » reality--a clean, alternative energy source. The Year 2001 marked the third year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion reactors. In 2001, PPPL's radiological environmental monitoring program measured tritium in the air at on- and off-site sampling stations. PPPL is capable of detecting small changes in the ambient levels of tritium by using highly sensitive monitors. The operation of an in-stack monitor located on D-site is a requirement of the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations; also included in PPPL's radiological environmental monitoring program, are water monitoring--precipitation, ground-, surface-, and waste-waters. PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the D-site stack; the data are presented in this report. Groundwater monitoring continue d under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the low levels of volatile organic compounds in an area adjacent to PPPL. In 2001, PPPL was in compliance with its permit limits for surface and sanitary discharges and had no reportable releases. Additionally, as part of DOE's program for the purchase of recycled content and other environmentally preferred products, PPPL has ranked in the excellent category of 80 to 90% of the goal.« less

  13. Monitoring multiple species: Estimating state variables and exploring the efficacy of a monitoring program

    USGS Publications Warehouse

    Mattfeldt, S.D.; Bailey, L.L.; Grant, E.H.C.

    2009-01-01

    Monitoring programs have the potential to identify population declines and differentiate among the possible cause(s) of these declines. Recent criticisms regarding the design of monitoring programs have highlighted a failure to clearly state objectives and to address detectability and spatial sampling issues. Here, we incorporate these criticisms to design an efficient monitoring program whose goals are to determine environmental factors which influence the current distribution and measure change in distributions over time for a suite of amphibians. In designing the study we (1) specified a priori factors that may relate to occupancy, extinction, and colonization probabilities and (2) used the data collected (incorporating detectability) to address our scientific questions and adjust our sampling protocols. Our results highlight the role of wetland hydroperiod and other local covariates in the probability of amphibian occupancy. There was a change in overall occupancy probabilities for most species over the first three years of monitoring. Most colonization and extinction estimates were constant over time (years) and space (among wetlands), with one notable exception: local extinction probabilities for Rana clamitans were lower for wetlands with longer hydroperiods. We used information from the target system to generate scenarios of population change and gauge the ability of the current sampling to meet monitoring goals. Our results highlight the limitations of the current sampling design, emphasizing the need for long-term efforts, with periodic re-evaluation of the program in a framework that can inform management decisions.

  14. Methods for shorebird surveys in the Arctic

    Treesearch

    Jonathan Bart; Susan L. Earnst

    2005-01-01

    A substantial effort is being made to develop a longterm monitoring program for shorebirds in North American (Brown et al. 2000, Donaldson et al. 2001, Bart et al. this volume). The current program, PRISM (Program for Regional and International Shorebird Monitoring), has four segments: arctic and boreal breeding surveys, temperate breeding surveys, temperate non-...

  15. Overview of the forest health monitoring program

    Treesearch

    2000-01-01

    This paper presents an overview of the Forest Health Monitoring Program (FHM), a partnership among the USDA Forest Service, State Foresters, universities, and the USDI Bureau of Land Management. The purpose of FHM is to annually assess the condition of the nation's forested ecosystems in a standardized way. There are four components of the program - Detection...

  16. Overview of the Forest Health Monitoring Program

    Treesearch

    2000-01-01

    This paper presents an overview of the Forest Health Monitoring Program (FHM), a partnership among the USDA Forest Service, State Foresters, universities, and the USDI Bureau of Land Management. The purpose of FHM is to annually assess the condition of the Nation's forested ecosystems in a standardized way. There are four components of the program-Detection...

  17. 12 CFR 906.13 - How does the Finance Board oversee and monitor the outreach program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false How does the Finance Board oversee and monitor the outreach program? 906.13 Section 906.13 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses...

  18. Captures of boll weevils (Coleoptera: Curculionidae) in relation to trap orientation and distance from brush lines

    USDA-ARS?s Scientific Manuscript database

    Eradication programs for the boll weevil (Anthonomus grandis Boheman) rely on pheromone-baited traps to trigger insecticide treatments and monitor program progress. A key objective of monitoring in these programs is the timely detection of incipient weevil populations to limit or prevent re-infestat...

  19. 25 CFR 36.51 - Standard XVIII-Office of Indian Education Programs and Agency monitoring and evaluation...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Standard XVIII-Office of Indian Education Programs and..., DEPARTMENT OF THE INTERIOR EDUCATION MINIMUM ACADEMIC STANDARDS FOR THE BASIC EDUCATION OF INDIAN CHILDREN... XVIII—Office of Indian Education Programs and Agency monitoring and evaluation responsibilities. (a) The...

  20. Importance of well-designed monitoring programs for the conservation of endangered species: case study of the Snail Kite

    USGS Publications Warehouse

    Martin, J.; Kitchens, W.M.; Hines, J.E.

    2007-01-01

    Monitoring natural populations is often a necessary step to establish the conservation status of species and to help improve management decisions. Nevertheless, many monitoring programs do not effectively address primary sources of variability in monitoring data, which ultimately may limit the utility of monitoring in identifying declines and improving management. To illustrate the importance of taking into account detectability and spatial variation, we used a recently proposed estimator of abundance (superpopulation estimator) to estimate population size of and number of young produced by the Snail Kite (Rostrhamus sociabilis plumbeus) in Florida. During the last decade, primary recovery targets set by the U.S. Fish and Wildlife Service for the Snail Kite that were based on deficient monitoring programs (i.e., uncorrected counts) were close to being met (by simply increasing search effort during count surveys). During that same period, the Snail Kite population declined dramatically (by 55% from 1997 to 2005) and the number of young decreased by 70% between 1992?1998 and 1999?2005. Our results provide a strong practical case in favor of the argument that investing a sufficient amount of time and resources into designing and implementing monitoring programs that carefully address detectability and spatial variation is critical for the conservation of endangered species.

  1. Protocols for collection of streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data to describe stream quality for the Hydrobiological Monitoring Program, Equus Beds Aquifer Storage and Recovery Program, city of Wichita, Kansas

    USGS Publications Warehouse

    Stone, Mandy L.; Rasmussen, Teresa J.; Bennett, Trudy J.; Poulton, Barry C.; Ziegler, Andrew C.

    2012-01-01

    The city of Wichita, Kansas uses the Equus Beds aquifer, one of two sources, for municipal water supply. To meet future water needs, plans for artificial recharge of the aquifer have been implemented in several phases. Phase I of the Equus Beds Aquifer Storage and Recovery (ASR) Program began with injection of water from the Little Arkansas River into the aquifer for storage and subsequent recovery in 2006. Construction of a river intake structure and surface-water treatment plant began as implementation of Phase II of the Equus Beds ASR Program in 2010. An important aspect of the ASR Program is the monitoring of water quality and the effects of recharge activities on stream conditions. Physical, chemical, and biological data provide the basis for an integrated assessment of stream quality. This report describes protocols for collecting streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data as part of the city of Wichita's hydrobiological monitoring program (HBMP). Following consistent and reliable methods for data collection and processing is imperative for the long-term success of the monitoring program.

  2. Yucca Mountain biological resources monitoring program; Annual report FY92

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1993-02-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a potential site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities (SCA) do not adversely affect the environment at Yucca Mountain, an environmental program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmentalmore » regulations. This report describes the activities and accomplishments of EG&G Energy Measurements, Inc. (EG&G/EM) during fiscal year 1992 (FY92) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.« less

  3. Design Exception In-Service Monitoring Program Development

    DOT National Transportation Integrated Search

    2017-05-01

    This study evaluates various possible program designs for in-service monitoring of design exceptions (DEs) for the Georgia Department of Transportation. The study recommends a multitier stepwise approach to the evaluation of DEs. Specifically, the pr...

  4. 76 FR 51048 - Notice of Submission of Proposed Information Collection to OMB Ginnie Mae Mortgage-Backed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...-Backed Securities programs and to monitor performance and compliance with established rules and... issuers/customers in its Mortgage-Backed Securities programs and to monitor performance and compliance...

  5. 7 CFR 1484.74 - How is Cooperator program compliance monitored?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... is Cooperator program compliance monitored? (a) The Compliance Review Staff (CRS), FAS, performs... pursuant to § 1550.20(a)(14), FAS will consider the Cooperator's overall marketing budget from year to year...

  6. EPA RESISTANCE MONITORING RESEARCH (NCR)

    EPA Science Inventory

    The 2006 resistance management research program was organized around three components: development of resistance monitoring program for Bt corn using remote sensing, standardization of resistance assays, and testing of resistance management models. Each area of research has shown...

  7. A Novel and Cost-Effective Monitoring Approach for Outcomes in an Australian Biodiversity Conservation Incentive Program

    PubMed Central

    Lindenmayer, David B.; Zammit, Charles; Attwood, Simon J.; Burns, Emma; Shepherd, Claire L.; Kay, Geoff; Wood, Jeff

    2012-01-01

    We report on the design and implementation of ecological monitoring for an Australian biodiversity conservation incentive scheme – the Environmental Stewardship Program. The Program uses competitive auctions to contract individual land managers for up to 15 years to conserve matters of National Environmental Significance (with an initial priority on nationally threatened ecological communities). The ecological monitoring was explicitly aligned with the Program’s policy objective and desired outcomes and was applied to the Program’s initial Project which targeted the critically endangered White Box-Yellow Box-Blakely's Red Gum Grassy Woodland and Derived Native Grassland ecological community in south eastern Australia. These woodlands have been reduced to <3% of their original extent and persist mostly as small remnants of variable condition on private farmland. We established monitoring sites on 153 farms located over 172,232 sq km. On each farm we established a monitoring site within the woodland patch funded for management and, wherever possible, a matched control site. The monitoring has entailed gathering data on vegetation condition, reptiles and birds. We also gathered data on the costs of experimental design, site establishment, field survey, and data analysis. The costs of monitoring are approximately 8.5% of the Program’s investment in the first four years and hence are in broad accord with the general rule of thumb that 5–10% of a program’s funding should be invested in monitoring. Once initial monitoring and site benchmarking are completed we propose to implement a novel rotating sampling approach that will maintain scientific integrity while achieving an annual cost-efficiency of up to 23%. We discuss useful lessons relevant to other monitoring programs where there is a need to provide managers with reliable early evidence of program effectiveness and to demonstrate opportunities for cost-efficiencies. PMID:23236399

  8. Monitoring post-fire vegetation rehabilitation projects: A common approach for non-forested ecosystems

    USGS Publications Warehouse

    Wirth, Troy A.; Pyke, David A.

    2007-01-01

    Emergency Stabilization and Rehabilitation (ES&R) and Burned Area Emergency Response (BAER) treatments are short-term, high-intensity treatments designed to mitigate the adverse effects of wildfire on public lands. The federal government expends significant resources implementing ES&R and BAER treatments after wildfires; however, recent reviews have found that existing data from monitoring and research are insufficient to evaluate the effects of these activities. The purpose of this report is to: (1) document what monitoring methods are generally used by personnel in the field; (2) describe approaches and methods for post-fire vegetation and soil monitoring documented in agency manuals; (3) determine the common elements of monitoring programs recommended in these manuals; and (4) describe a common monitoring approach to determine the effectiveness of future ES&R and BAER treatments in non-forested regions. Both qualitative and quantitative methods to measure effectiveness of ES&R treatments are used by federal land management agencies. Quantitative methods are used in the field depending on factors such as funding, personnel, and time constraints. There are seven vegetation monitoring manuals produced by the federal government that address monitoring methods for (primarily) vegetation and soil attributes. These methods vary in their objectivity and repeatability. The most repeatable methods are point-intercept, quadrat-based density measurements, gap intercepts, and direct measurement of soil erosion. Additionally, these manuals recommend approaches for designing monitoring programs for the state of ecosystems or the effect of management actions. The elements of a defensible monitoring program applicable to ES&R and BAER projects that most of these manuals have in common are objectives, stratification, control areas, random sampling, data quality, and statistical analysis. The effectiveness of treatments can be determined more accurately if data are gathered using an approach that incorporates these six monitoring program design elements and objectives, as well as repeatable procedures to measure cover, density, gap intercept, and soil erosion within each ecoregion and plant community. Additionally, using a common monitoring program design with comparable methods, consistently documenting results, and creating and maintaining a central database for query and reporting, will ultimately allow a determination of the effectiveness of post-fire rehabilitation activities region-wide.

  9. Real-Time Monitoring of Scada Based Control System for Filling Process

    NASA Astrophysics Data System (ADS)

    Soe, Aung Kyaw; Myint, Aung Naing; Latt, Maung Maung; Theingi

    2008-10-01

    This paper is a design of real-time monitoring for filling system using Supervisory Control and Data Acquisition (SCADA). The monitoring of production process is described in real-time using Visual Basic.Net programming under Visual Studio 2005 software without SCADA software. The software integrators are programmed to get the required information for the configuration screens. Simulation of components is expressed on the computer screen using parallel port between computers and filling devices. The programs of real-time simulation for the filling process from the pure drinking water industry are provided.

  10. Forest health monitoring and forestry implications in the Czech Republic

    Treesearch

    Martin Cerny; Pavel Moravcik

    1998-01-01

    In recent years, a forest monitoring program in the Czech Republic was extended into more detailed monitoring that aimed to describe the extent of changes in forest vitality and identify the nature and the main causes of these changes on local and regional scales. Studies were undertaken in six mountain areas in the Czech Republic. The program of regional forest...

  11. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Treesearch

    Jonathan Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  12. PACFISH/INFISH Biological Opinion (PIBO): Effectiveness Monitoring Program seven-year status report 1998 through 2004

    Treesearch

    Richard C. Henderson; Eric K. Archer; Boyd A Bouwes; Marc S. Coles-Ritchie; Jeffrey L. Kershner

    2005-01-01

    The PACFISH/INFISH Biological Opinion (PIBO) Effectiveness Monitoring Program was initiated in 1998 to provide a consistent framework for monitoring aquatic and riparian resources on most Forest Service and Bureau of Land Management lands within the Upper Columbia River Basin. This 7-year status report gives our funding sources, partners, and the public an overview of...

  13. 25 CFR 170.702 - What activities may the Secretary review and monitor?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What activities may the Secretary review and monitor? 170.702 Section 170.702 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Program Oversight and Accountability § 170.702 What activities may the Secretary review and monitor? The Secretary...

  14. 25 CFR 170.702 - What activities may the Secretary review and monitor?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What activities may the Secretary review and monitor? 170.702 Section 170.702 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Program Oversight and Accountability § 170.702 What activities may the Secretary review and monitor? The Secretary...

  15. Spatially explicit power analysis for occupancy-based monitoring of wolverine populations in the U.S

    Treesearch

    Martha M. Ellis; Jacob S. Ivan; Michael K. Schwartz

    2014-01-01

    Conservation scientists and resource managers often have to design monitoring programs for species that are rare or patchily distributed across large landscapes. Such programs are frequently expensive and seldom can be conducted by one entity. It is essential that a prospective power analysis be undertaken to ensure stated monitoring goals are feasible. We developed a...

  16. Monitoring pesticides in wildlife

    USGS Publications Warehouse

    Dustman, E.H.; Martin, W.E.; Heath, R.G.; Reichel, W.L.

    1971-01-01

    Early in the development of the wildlife monitoring program, certain criteria were recognized as being important in the selection of species of wild animals suitable for pesticide monitoring purposes. Ideally, the forms selected should be geographically well distributed, and they should be reasonably abundant and readily available for sampling. In addition, animals occurring near the top of food chains have the capacity to reflect residues in organisms occurring at lower levels in the same food chains. Based on these criteria, species chosen for monitoring include the starling (Sturnus vulgaris), mallard (Anas platyrhynchos) and black ducks (Anas rubripes), and the bald eagle (Haliaeetus leucocephalus). The black duck is substituted for the mallard in States where suitable numbers of mallards cannot be obtained. The Bureau of Sport Fisheries and Wildlife is held responsible for the execution of the wildlife portion of the National Pesticide Monitoring Program. The primary objective is to ascertain on a nationwide basis and independent of specific treatments the levels and trends of certain pesticidal chemicals and other pollutants in the bodies of selected forms of wildlife. The program was first described by Johnson et al. (4) in 1967. The purpose of this report is to update and redescribe the wildlife monitoring program and briefly review accomplishments.

  17. 2007 Annual Health Physics Report for the HEU Transparency Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Radev, R

    2008-04-09

    During the 2007 calendar year, Lawrence Livermore National Laboratory (LLNL) provided health physics support for the Highly Enriched Uranium (HEU) Transparency Program for external and internal radiation protection and technical expertise related to BDMS radioactive sources and Russian radiation safety regulatory compliance. For the calendar year 2007, there were 172 person-trips that required dose monitoring of the U.S. monitors. Of the 172 person-trips, 160 person-trips were SMVs and 12 person-trips were Transparency Monitoring Office (TMO) trips. There were 12 monitoring visits by TMO monitors to facilities other than UEIE and 10 to UEIE itself. There were two monitoring visits (sourcemore » changes) that were back to back with 14 monitors. LLNL's Hazard Control Division laboratories provided the dosimetry services for the HEU Transparency monitors.« less

  18. The Savannah River Site`s Groundwater Monitoring Program: Third quarter 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogers, C.D.

    1993-02-04

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. Table 1 lists those well series with constituents in the groundwater above Flag 2 during third quarter 1992, organized by location. Results from all laboratory analyses are used to generate this table. Specific conductance and pH data from the field also are included in this table.

  19. Some applications of remote sensing in atmospheric monitoring programs

    NASA Technical Reports Server (NTRS)

    Heller, A. N.; Bryson, J. C.; Vasuki, N. C.

    1972-01-01

    The applications of remote sensing in atmospheric monitoring programs are described. The organization, operations, and functions of an air quality monitoring network at New Castle County, Delaware is discussed. The data obtained by the air quality monitoring network ground stations and the equipment used to obtain atmospheric data are explained. It is concluded that correlation of the information obtained by the network will make it possible to anticipate air pollution problems in the Chesapeake Bay area before a crisis develops.

  20. The North American Amphibian Monitoring Program. [abstract

    USGS Publications Warehouse

    Griffin, J.

    1998-01-01

    The North American Amphibian Monitoring Program has been under development for the past three years. The monitoring strategy for NAAMP has five main prongs: terrestrial salamander surveys, calling surveys, aquatic surveys, western surveys, and atlassing. Of these five, calling surveys were selected as one of the first implementation priorities due to their friendliness to volunteers of varying knowledge levels, relative low cost, and the fact that several groups had already pioneered the techniques involved. While some states and provinces had implemented calling surveys prior to NAAMP, like WI and IL, most states and provinces had little or no history of state/provincewide amphibian monitoring. Thus, the majority of calling survey programs were initiated in the past two years. To assess the progress of this pilot phase, a program review was conducted on the status of the NAAMP calling survey program, and the results of that review will be presented at the meeting. Topics to be discussed include: who is doing what where, extent of route coverage, the continuing random route discussions, quality assurance, strengths and weaknesses of calling surveys, reliability of data, and directions for the future. In addition, a brief overview of the DISPro project will be included. DISPro is a new amphibian monitoring program in National Parks, funded by the Demonstration of Intensive Sites Program (DISPro) through the EPA and NPS. It will begin this year at Big Bend and Shenandoah National Parks. The purpose of the DISPro Amphibian Project will be to investigate relationships between environmental factors and stressors and the distribution, abundance, and health of amphibians in these National Parks. At each Park, amphibian long-term monitoring protocols will be tested, distributions and abundance of amphibians will be mapped, and field research experiments will be conducted to examine stressor effects on amphibians (e.g., ultraviolet radiation, contaminants, acidification).

  1. Assessment of citizen group court monitoring programs

    DOT National Transportation Integrated Search

    1987-03-01

    The purpose of the study is to determine whether the presence of a citizen group court monitoring program within a jurisdiction influences the disposition of driving while intoxicated cases. Initial research identified a number of citizens group cour...

  2. 12 CFR 361.5 - What are the FDIC's oversight and monitoring responsibilities in administering this program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false What are the FDIC's oversight and monitoring responsibilities in administering this program? 361.5 Section 361.5 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY MINORITY AND WOMEN OUTREACH PROGRAM CONTRACTING § 361...

  3. Developing Inventory and Monitoring Programs Based on Multiple Objectives

    Treesearch

    Daniel L. Schmoldt; David L. Peterson; David G. Silsbee

    1995-01-01

    Resource inventory and monitoring (I&M) programs in national parks combine multiple objectives in order to create a plan of action over a finite time horizon. Because all program activities are constrained by time and money, it is critical to plan I&M activities that make the best use of available agency resources. However, multiple objectives complicate a...

  4. Introduction - regional monitoring programs

    Treesearch

    Richard L. Hutto; C. John Ralph

    2005-01-01

    There is increasing interest in the initiation of regional or statewide monitoring programs that are less extensive than national efforts such as the Breeding Bird Survey. A number of regional programs have been in existence for a decade or more, so the papers in this section represented an effort to bring together the collective experience of the people who had...

  5. 3.0 Foundation programs for the Delaware CEMRI framework

    Treesearch

    Peter S. Murdoch

    2008-01-01

    A complete review of all the national monitoring programs that could possibly contribute to the Delaware River Basin (DRB) CEMRI Framework is beyond the scope of this report. The U.S. Environmental Protection Agency (EPA) Mid-Atlantic Integrated Assessment developed a Web-based annotated inventory of such monitoring programs for the mid-Atlantic region. Olsen et al. (...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Mark J; Efroymson, Rebecca Ann; Adams, Marshall

    The long-term ecological recovery of an impaired stream in response to an industrial facility's pollution abatement actions and the implications of the biological monitoring effort to environmental management is the subject of this special issue of Environmental Management. This final article focuses on the synthesis of the biological monitoring program's components and methods, the efficacy of various biological monitoring techniques to environmental management, and the lessons learned from the program that might be applicable to the design and application of other programs. The focus of the 25-year program has been on East Fork Poplar Creek, an ecologically impaired stream inmore » Oak Ridge, Tennessee with varied and complex stressors from a Department of Energy facility in its headwaters. Major components of the long-term program included testing and monitoring of invertebrate and fish toxicity, bioindicators of fish health, fish contaminant accumulation, and instream communities (including periphyton, benthic macroinvertebrate, and fish). Key parallel components of the program include water chemistry sampling and data management. Multiple lines of evidence suggested positive ecological responses during three major pollution abatement periods. Based on this case study and the related literature, effective environmental management of impaired streams starts with program design that is consistent across space and time, but also adaptable to changing conditions. The biological monitoring approaches used for the program provided a strong basis for assessments of recovery from remedial actions, and the likely causes of impairment. This case study provides a unique application of multidisciplinary and quantitative techniques to address multiple and complex regulatory and programmatic goals, environmental stressors, and remedial actions.« less

  7. The Automated Instrumentation and Monitoring System (AIMS): Design and Architecture. 3.2

    NASA Technical Reports Server (NTRS)

    Yan, Jerry C.; Schmidt, Melisa; Schulbach, Cathy; Bailey, David (Technical Monitor)

    1997-01-01

    Whether a researcher is designing the 'next parallel programming paradigm', another 'scalable multiprocessor' or investigating resource allocation algorithms for multiprocessors, a facility that enables parallel program execution to be captured and displayed is invaluable. Careful analysis of such information can help computer and software architects to capture, and therefore, exploit behavioral variations among/within various parallel programs to take advantage of specific hardware characteristics. A software tool-set that facilitates performance evaluation of parallel applications on multiprocessors has been put together at NASA Ames Research Center under the sponsorship of NASA's High Performance Computing and Communications Program over the past five years. The Automated Instrumentation and Monitoring Systematic has three major software components: a source code instrumentor which automatically inserts active event recorders into program source code before compilation; a run-time performance monitoring library which collects performance data; and a visualization tool-set which reconstructs program execution based on the data collected. Besides being used as a prototype for developing new techniques for instrumenting, monitoring and presenting parallel program execution, AIMS is also being incorporated into the run-time environments of various hardware testbeds to evaluate their impact on user productivity. Currently, the execution of FORTRAN and C programs on the Intel Paragon and PALM workstations can be automatically instrumented and monitored. Performance data thus collected can be displayed graphically on various workstations. The process of performance tuning with AIMS will be illustrated using various NAB Parallel Benchmarks. This report includes a description of the internal architecture of AIMS and a listing of the source code.

  8. Evaluation of a training program for nurse supervisors who monitor nurses in an alternative-to-discipline program.

    PubMed

    Cadiz, David; Truxillo, Donald; OʼNeill, Chris

    2012-01-01

    Nurse alternative-to-discipline programs aim to protect the public from the harm of impaired practice and to support nurses in early recovery from substance use disorders. Supervisor observation of work behavior is one key monitoring activity that protects the public. We evaluate a supervisory training called "Fit to Perform" for nurse managers to help them monitor and manage nurses enrolled in an alternative-to-discipline program. We observed significant mean changes in knowledge, training utility, self-efficacy, and substance abuse stigma. The results suggest that the training positively affects knowledge about substance use disorders, confidence to supervise nurses enrolled in an alternative-to-discipline program, and reduces stigma, which may create a supportive workplace for nurses in recovery.

  9. New tools using the hardware performance monitor to help users tune programs on the Cray X-MP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engert, D.E.; Rudsinski, L.; Doak, J.

    1991-09-25

    The performance of a Cray system is highly dependent on the tuning techniques used by individuals on their codes. Many of our users were not taking advantage of the tuning tools that allow them to monitor their own programs by using the Hardware Performance Monitor (HPM). We therefore modified UNICOS to collect HPM data for all processes and to report Mflop ratings based on users, programs, and time used. Our tuning efforts are now being focused on the users and programs that have the best potential for performance improvements. These modifications and some of the more striking performance improvements aremore » described.« less

  10. 2009 Annual Health Physics Report for the HEU Transparency Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Radev, R

    2010-04-14

    During the 2009 calendar year, Lawrence Livermore National Laboratory (LLNL) provided health physics support for the Highly Enriched Uranium (HEU) Transparency Program for external and internal radiation protection. LLNL also provided technical expertise related to BDMS radioactive sources and Russian radiation safety regulatory compliance. For the calendar year 2009, there were 159 person-trips that required dose monitoring of the U.S. monitors. Of the 159 person-trips, 149 person-trips were SMVs and 10 person-trips were Transparency Monitoring Office (TMO) trips. There were 4 monitoring visits by TMO monitors to facilities other than UEIE and 10 to UEIE itself. LLNL's Hazard Control Departmentmore » laboratories provided the dosimetry services for the HEU Transparency monitors. In 2009, the HEU Transparency activities in Russia were conducted in a radiologically safe manner for the HEU Transparency monitors in accordance with the expectations of the HEU Transparency staff, NNSA and DOE. The HEU Transparency Program now has over fifteen years of successful experience in developing and providing health and safety support in meeting its technical objectives.« less

  11. Preliminary assessment of a water-quality monitoring program for total maximum daily loads in Johnson County, Kansas, January 2015 through June 2016

    USGS Publications Warehouse

    Rasmussen, Teresa J.; Paxson, Chelsea R.

    2017-08-25

    Municipalities in Johnson County in northeastern Kansas are required to implement stormwater management programs to reduce pollutant discharges, protect water quality, and comply with applicable water-quality regulations in accordance with National Pollutant Discharge Elimination System permits for stormwater discharge. To this end, municipalities collect grab samples at streams entering and leaving their jurisdiction to determine levels of excessive nutrients, sediment, and fecal bacteria to characterize pollutants and understand the factors affecting them.In 2014, the U.S. Geological Survey and the Johnson County Stormwater Management Program, with input from the Kansas Department of Health and Environment, initiated a 5-year monitoring program to satisfy minimum sampling requirements for each municipality as described by new stormwater permits issued to Johnson County municipalities. The purpose of this report is to provide a preliminary assessment of the monitoring program. The monitoring program is described, a preliminary assessment of the monitoring program design is provided using water-quality data collected during the first 2 years of the program, and the ability of the current monitoring network and sampling plan to provide data sufficient to quantify improvements in water quality resulting from implemented and planned best management practices is evaluated. The information in this initial report may be used to evaluate changes in data collection methods while data collection is still ongoing that may lead to improved data utility.Discrete water-quality samples were collected at 27 sites and analyzed for nutrients, Escherichia coli (E. coli) bacteria, total suspended solids, and suspended-sediment concentration. In addition, continuous water-quality data (water temperature, pH, dissolved oxygen, specific conductance, turbidity, and nitrate plus nitrite) were collected at one site to characterize variability and provide a basis for comparison to discrete data. Base flow samples indicated that point sources are likely affecting nutrient concentrations and E. coli bacteria densities at several sites. Concentrations of all analytes in storm runoff samples were characterized by substantial variability among sites and samples. About one-half of the sites, representing different watersheds, had storm runoff samples with nitrogen concentrations greater than 10 milligrams per liter. About one-third of the sites, representing different watersheds, had storm runoff samples with total phosphorus concentrations greater than 3 milligrams per liter. Six sites had samples with E. coli densities greater than 100,000 colonies per 100 milliliters of water. Total suspended solids concentrations of about 12,000 milligrams per liter or greater occurred in samples from three sites.Data collected for this monitoring program may be useful for some general assessment purposes but may also be limited in potential to fully inform stormwater management activities. Valuable attributes of the monitoring program design included incorporating many sites across the county for comparisons among watersheds and municipalities, using fixed-stage samplers to collect multiple samples during single events, collection of base flow samples in addition to storm samples to isolate possible point sources from stormwater sources, and use of continuous monitors to characterize variability. Limiting attributes of the monitoring program design included location of monitoring sites along municipal boundaries to satisfy permit requirements rather than using watershed-based criteria such as locations of tributaries, potential pollutant sources, and implemented management practices. Additional limiting attributes include having a large number of widespread sampling locations, which presented logistical challenges for predicting localized rainfall and collecting and analyzing samples during short timeframes associated with storms, and collecting storm samples at fixed-stage elevations only during the rising limb of storms, which does not characterize conditions over the storm hydrograph. The small number of samples collected per site resulted in a sample size too small to be representative of site conditions, including seasonal and hydrologic variability, and insufficient for meaningful statistical analysis or site-specific modeling.Several measures could be taken to improve data utility and include redesigning the monitoring network according to watershed characteristics, incorporating a nested design in which data are collected at different scales (watershed, subwatershed, and best management practices), increasing sampling frequency, and combining different methods to allow for flexibility to focus on areas and conditions of particular interest. A monitoring design that would facilitate most of these improvements would be to focus efforts on a limited number of watersheds for several years, then cycle to the next set of watersheds for several years, eventually returning to previously monitored watersheds to document changes.Redesign of the water-quality monitoring program requires considerable effort and commitment from municipalities of Johnson County. However, the long-term benefit likely is a monitoring program that results in improved stream conditions and more effective management practices and efficient expenditure of resources.

  12. The Automated Instrumentation and Monitoring System (AIMS) reference manual

    NASA Technical Reports Server (NTRS)

    Yan, Jerry; Hontalas, Philip; Listgarten, Sherry

    1993-01-01

    Whether a researcher is designing the 'next parallel programming paradigm,' another 'scalable multiprocessor' or investigating resource allocation algorithms for multiprocessors, a facility that enables parallel program execution to be captured and displayed is invaluable. Careful analysis of execution traces can help computer designers and software architects to uncover system behavior and to take advantage of specific application characteristics and hardware features. A software tool kit that facilitates performance evaluation of parallel applications on multiprocessors is described. The Automated Instrumentation and Monitoring System (AIMS) has four major software components: a source code instrumentor which automatically inserts active event recorders into the program's source code before compilation; a run time performance-monitoring library, which collects performance data; a trace file animation and analysis tool kit which reconstructs program execution from the trace file; and a trace post-processor which compensate for data collection overhead. Besides being used as prototype for developing new techniques for instrumenting, monitoring, and visualizing parallel program execution, AIMS is also being incorporated into the run-time environments of various hardware test beds to evaluate their impact on user productivity. Currently, AIMS instrumentors accept FORTRAN and C parallel programs written for Intel's NX operating system on the iPSC family of multi computers. A run-time performance-monitoring library for the iPSC/860 is included in this release. We plan to release monitors for other platforms (such as PVM and TMC's CM-5) in the near future. Performance data collected can be graphically displayed on workstations (e.g. Sun Sparc and SGI) supporting X-Windows (in particular, Xl IR5, Motif 1.1.3).

  13. Maywood Interim Storage Site: Annual environmental report for calendar year 1990, Maywood, New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) and surrounding area began in 1984. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The MISS Environmental monitoring programs was established to accommodate facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, extent and use of affected land and water, and localmore » public interest or concern. The environmental monitoring program at MISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium, radium-226, and thorium-232 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs, and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program show that concentrations of the contaminants of concern were all below applicable standards. Because the site is used only for interim storage and produces no processing effluents, all monitoring, except for radon and direct gamma radiation, was done on a quarterly basis. 18 refs., 17 figs., 28 tabs.« less

  14. Environmental monitoring for public access and community tracking (EMPACT): Discussion of the program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engel-Cox, J.A.

    1999-07-01

    The Environmental Monitoring for Public Access and Community Tracking (EMPACT) program is a unique initiative to provide time-relevant environmental information that is easily accessible and clearly communicated to residents in 86 of the nation's largest metropolitan areas. EMPACT is a US Environmental Protection Agency (EPA) program to use innovative and time-relevant monitoring and communication technologies. President Clinton articulated his vision for right-to-know programs when he directed the EPA to provide local environmental information to communities. EPA Administrator Carol Browner created EMPACT and other programs to meet this vision, giving EMPACT the goal of providing timely, useful and accurate environmental andmore » public health information to all Americans. This paper is an analysis of the status of the EMPACT program during its first 2 years. EMPACT has launched 27 environmental monitoring and communication projects, including metropolitan grants, EPA Headquarter and Regional projects, and research activities. These projects are located in 37 states and 68 cities throughout the United States, and represent significant progress towards EMPACT's goal of reaching 86 major metropolitan areas throughout all 50 states, the District of Columbia and Puerto Rico by 2001. These projects focus on five principles established by EPA Administrator Browner: using advanced technology and science, establishing partnerships, increasing public access to data, communicating useful action-oriented information, and establishing a framework for sharing monitoring techniques and data between projects.« less

  15. Solutions Network Formulation Report. The Potential Contribution of the International GPM Program to the NOAA Estuarine Reserves Division's System-wide Monitoring Program

    NASA Technical Reports Server (NTRS)

    Hilbert, Kent; Anderson, Daniel; Lewis, David

    2007-01-01

    Data collected via the International GPM Program could be used to provide a solution for the NOAA Estuarine Reserves Division s System-wide Monitoring Program by augmenting in situ rainfall measurements with data acquired via future satellite-acquired precipitation data. This Candidate Solution is in alignment with the Coastal Management National Application and will benefit society by assisting in estuary preservation.

  16. Development of a metrics dashboard for monitoring involvement in the 340B Drug Pricing Program.

    PubMed

    Karralli, Rusol; Tipton, Joyce; Dumitru, Doina; Scholz, Lisa; Masilamani, Santhi

    2015-09-01

    An electronic tool to support hospital organizations in monitoring and addressing financial and compliance challenges related to participation in the 340B Drug Pricing Program is described. In recent years there has been heightened congressional and regulatory scrutiny of the federal 340B program, which provides discounted drug prices on Medicaid-covered drugs to safety net hospitals and other 340B-eligible healthcare organizations, or "covered entities." Historically, the 340B program has lacked a metrics-driven reporting framework to help covered entities capture the value of 340B program involvement, community benefits provided to underserved populations, and costs associated with compliance with 340B eligibility requirements. As part of an initiative by a large health system to optimize its 340B program utilization and regulatory compliance efforts, a team of pharmacists led the development of an electronic dashboard tool to help monitor 340B program activities at the system's 340B-eligible facilities. After soliciting input from an array of internal and external 340B program stakeholders, the team designed the dashboard and associated data-entry tools to facilitate the capture and analysis of 340B program-related data in four domains: cost savings and revenue, program maintenance costs, community benefits, and compliance. A large health system enhanced its ability to evaluate and monitor 340B program-related activities through the use of a dashboard tool capturing key metrics on cost savings achieved, maintenance costs, and other aspects of program involvement. Copyright © 2015 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  17. Chickamauga Reservoir 1992 fisheries monitoring cove rotenone results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerley, B.L.

    1993-06-01

    The Tennessee Valley Authority (TVA) is required by the National Pollutant Discharge Elimination System (NPDES) Permit for Sequoyah Nuclear Plant (SQN) to conduct and report annually a nonradiological operational monitoring program to evaluate potential effects of SQN on Chickamauga Reservoir. This monitoring program was initially designed to identify potential changes in water quality and biological communities in Chickamauga Reservoir resulting from operation of SQU. Chickamauga Reservoir cove rotenone sampling has also been conducted as part of the preoperational monitoring program for Watts Bar Nuclear Plant (WBN) to evaluate the combined effects of operating two nuclear facilities on one reservoir oncemore » WBU becomes operational. The purpose of this report is to present results of cove rotenone sampling conducted on Chickamauga Reservoir in 1992.« less

  18. Louisiana Barrier Island Comprehensive Monitoring (BICM) Program Summary Report: Data and Analyses 2006 through 2010

    USGS Publications Warehouse

    Kindinger, Jack G.; Buster, Noreen A.; Flocks, James G.; Bernier, Julie C.; Kulp, Mark A.

    2013-01-01

    The Barrier Island Comprehensive Monitoring (BICM) program was implemented under the Louisiana Coastal Area Science and Technology (LCA S&T) office as a component of the System Wide Assessment and Monitoring (SWAMP) program. The BICM project was developed by the State of Louisiana (Coastal Protection Restoration Authority [CPRA], formerly Department of Natural Resources [DNR]) to complement other Louisiana coastal monitoring programs such as the Coastwide Reference Monitoring System-Wetlands (CRMS-Wetlands) and was a collaborative research effort by CPRA, University of New Orleans (UNO), and the U.S. Geological Survey (USGS). The goal of the BICM program was to provide long-term data on the barrier islands of Louisiana that could be used to plan, design, evaluate, and maintain current and future barrier-island restoration projects. The BICM program used both historical and newly acquired (2006 to 2010) data to assess and monitor changes in the aerial and subaqueous extent of islands, habitat types, sediment texture and geotechnical properties, environmental processes, and vegetation composition. BICM datasets included aerial still and video photography (multiple time series) for shoreline positions, habitat mapping, and land loss; light detection and ranging (lidar) surveys for topographic elevations; single-beam and swath bathymetry; and sediment grab samples. Products produced using BICM data and analyses included (but were not limited to) storm-impact assessments, rate of shoreline and bathymetric change, shoreline-erosion and accretion maps, high-resolution elevation maps, coastal-shoreline and barrier-island habitat-classification maps, and coastal surficial-sediment characterization maps. Discussions in this report summarize the extensive data-collection efforts and present brief interpretive analyses for four coastal Louisiana geographic regions. In addition, several coastal-wide and topical themes were selected that integrate the data and analyses within a broader coastal context: (1) barrier-shoreline evolution driven by rapid relative sea-level rise (RSLR), (2) hurricane impacts to the Chandeleur Islands and likelihood of island recovery, (3) impact of tropical storms on barrier shorelines, (4) Barataria Bay tidal-inlet management, and (5) habitat changes related to RSLR. The final theme addresses potential future goals of the BICM program, including rotational annual to semi-decadal monitoring, proposed new-data collection, how to incorporate technological advances with previous data-collection and monitoring protocols, and standardizing methods and quality-control assessments for continued coastal monitoring and restoration.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Virginia L. Finley

    The results of the 2000 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and nonradioactive pollutants (if any) that are added to the environment as a result of PPPL's operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2000. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program ismore » to create innovations to make fusion power a practical reality -- an alternative energy source. The year 2000 marked the second year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion power plants. With its completion within budget and ahead of its target schedule, NSTX first plasma occurred on February 12, 1999. In 2000, PPPL's radiological environmental monitoring program measured tritium in the air at on-site and off-site sampling stations. PPPL is capable of detecting small changes in the ambient levels of tritium by using highly sensitive monitors. The operation of an in-stack monitor located on D-site is a requirement of the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations with limits set by the Environmental Protection Agency (EPA). Also included in PPPL's radiological environmental monitoring program, are precipitation, surface, ground, a nd waste water monitoring. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an area adjacent to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the D-site stack; the data are presented in this report.« less

  20. Instructional Methods for Neuroscience in Nurse Anesthesia Graduate Programs: A Survey of Educational Programs

    DTIC Science & Technology

    1999-10-01

    Sciences A. Anatomy, physiology and pathophysiology 1. Cardiovascular a. Arrhythmias b. Ischemic heart disease/angina c. Myocardial infarction d...Hypertension e. Congestive Heart Failure f. Shock Instructional Methods 66 g. Valvular Heart disease h. Cardiomyopathy i. Peripheral vascular disease j...Pulmonary artery pressure monitoring Instructional Methods 71 3. Precordial/esophageal stethoscope /Doppler 4. Respiratory monitoring a. Apnea monitor b

  1. EPA'S NATIONAL COASTAL ASSESSMENT PROGRAM

    EPA Science Inventory

    The National Coastal Assessment (NCA) is an environmental monitoring program initiated by the US Environmental Protection Agency's Office of Research and Development in 2000. The goal is to monitor selected ecological indicators in the nation's estuarine waters and to produce an...

  2. Home-Based Cardiac Rehabilitation.

    ERIC Educational Resources Information Center

    Fardy, Paul S.

    1987-01-01

    Although cardiac rehabilitation has become increasingly popular, only 15 percent of eligible candidates participate in supervised and monitored programs. This article reviews alternative home-based cardiac rehabilitation, discussing types of activities, monitoring, diet, motivation, and coordination with traditional program staff. (Author/MT)

  3. Integrating intersection traffic signal data into a traffic monitoring program.

    DOT National Transportation Integrated Search

    2014-09-01

    The objective of this study was to provide the Georgia Department of Transportation with : an evaluation of the feasibility of integrating intersection traffic signal data into a traffic : monitoring program. Some of the pertinent conclusions from th...

  4. NATIONAL STATUS AND TRENDS PROGRAM

    EPA Science Inventory

    Since 1984, the National Status and Trends (NS&T) Program has monitored, on a national scale, spatial and temporal trends of chemical contamination and biological responses to that contamination. Temporal trends are being monitored through the Mussel Watch project that analyzes m...

  5. 2018 EPA Protocol Gas Verification Program Participants

    EPA Pesticide Factsheets

    A list of participants for 2016 EPA's Protocol Gas Verification Program (PGVP) for stationary source monitoring. The list also has vendor IDs, which are production site-specific, and are the same ones used in the PGVP for ambient air monitoring.

  6. PROBABILITY SURVEYS , CONDITIONAL PROBABILITIES AND ECOLOGICAL RISK ASSESSMENT

    EPA Science Inventory

    We show that probability-based environmental resource monitoring programs, such as the U.S. Environmental Protection Agency's (U.S. EPA) Environmental Monitoring and Assessment Program, and conditional probability analysis can serve as a basis for estimating ecological risk over ...

  7. 1997 annual report : environmental monitoring program Louisiana offshore oil port pipeline.

    DOT National Transportation Integrated Search

    1998-06-01

    The Louisiana Offshore Oil Port (LOOP) Environmental Monitoring Program includes an onshore pipeline vegetation and wildlife survey as a continuing study designed to measure the immediate and long-term impacts of LOOP-related pipeline construction an...

  8. AGROECOSYSTEM PILOT FIELD PROGRAM REPORT - 1992

    EPA Science Inventory

    The Agroecosystem Resource Group (ARG) of the Environmental Monitoring and Assessment Program (EMAP) has developed a five-year strategy for the development, evaluation, and implementation of a suite of indicators for monitoring the status and trends of agroecosystem condition on ...

  9. Establishing monitoring programs for travel time reliability.

    DOT National Transportation Integrated Search

    2014-01-01

    Within the second Strategic Highway Research Program (SHRP 2), Project L02 focused on creating a suite of methods by which transportation agencies could monitor and evaluate travel time reliability. Creation of the methods also produced an improved u...

  10. PROBABILITY SURVEYS, CONDITIONAL PROBABILITIES, AND ECOLOGICAL RISK ASSESSMENT

    EPA Science Inventory

    We show that probability-based environmental resource monitoring programs, such as U.S. Environmental Protection Agency's (U.S. EPA) Environmental Monitoring and Asscssment Program EMAP) can be analyzed with a conditional probability analysis (CPA) to conduct quantitative probabi...

  11. LOVE CANAL MONITORING PROGRAM. VOLUME 1

    EPA Science Inventory

    This report summarizes the prime contractor activities during the monitoring phase of the Love Canal project. Since GCA Corporation was only responsible for data collection, no analytical results appear in this report. The program involved a multifaceted sampling and analytical e...

  12. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1992 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hawkes, Lynnette A.; Martinson, Rick D.; Absolon, Randall F.

    1993-05-01

    The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relativemore » run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC`s Fish Passage Data System (FPDS).« less

  13. Fourth report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loar, J.M.

    1994-04-01

    In response to a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC) and selected tributaries. BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, andmore » (6) radioecology of WOC and White Oak Lake. The ecological characterization of the WOC watershed will provide baseline data that can be used to document the ecological effects of the water pollution control program and the remedial action program. The long-term nature of BMAP ensures that the effectiveness of remedial measures will be properly evaluated.« less

  14. Self-Monitoring Using Continuous Glucose Monitors with Real-Time Feedback Improves Exercise Adherence in Individuals with Impaired Blood Glucose: A Pilot Study.

    PubMed

    Bailey, Kaitlyn J; Little, Jonathan P; Jung, Mary E

    2016-03-01

    Exercise helps individuals with prediabetes or type 2 diabetes (T2D) manage their blood glucose (BG); however, exercise adherence in this population is dismal. In this pilot study we tested the efficacy of a self-monitoring group-based intervention using continuous glucose monitors (CGMs) at increasing exercise adherence in individuals with impaired BG. Thirteen participants with prediabetes or T2D were randomized to an 8-week standard care exercise program (CON condition) (n = 7) or self-monitoring exercise intervention (SM condition) (n = 6). Participants in the SM condition were taught how to self-monitor their exercise and BG, to goal set, and to use CGM to observe how exercise influences BG. We hypothesized that compared with the CON condition, using a real-time CGM would facilitate self-monitoring behavior, resulting in increased exercise adherence. Repeated-measures analysis of variance revealed significant Condition × Time interactions for self-monitoring (P < 0.01), goal setting (P = 0.01), and self-efficacy to self-monitor (P = 0.01), such that the SM condition showed greater increases in these outcomes immediately after the program and at the 1-month follow-up compared with the CON condition. The SM condition had higher program attendance rates (P = 0.03), and a greater proportion of participants reregistered for additional exercise programs (P = 0.048) compared with the CON condition. Participants in both conditions experienced improvements in health-related quality of life, waist circumference, and fitness (P values <0.05). These findings provide promising initial support for the use of a real-time CGM to foster self-monitoring and exercise behavior in individuals living with prediabetes or T2D.

  15. Recommendations for strengthening the infrared technology component of any condition monitoring program

    NASA Astrophysics Data System (ADS)

    Nicholas, Jack R., Jr.; Young, R. K.

    1999-03-01

    This presentation provides insights of a long term 'champion' of many condition monitoring technologies and a Level III infra red thermographer. The co-authors present recommendations based on their observations of infra red and other components of predictive, condition monitoring programs in manufacturing, utility and government defense and energy activities. As predictive maintenance service providers, trainers, informal observers and formal auditors of such programs, the co-authors provide a unique perspective that can be useful to practitioners, managers and customers of advanced programs. Each has over 30 years experience in the field of machinery operation, maintenance, and support the origins of which can be traced to and through the demanding requirements of the U.S. Navy nuclear submarine forces. They have over 10 years each of experience with programs in many different countries on 3 continents. Recommendations are provided on the following: (1) Leadership and Management Support (For survival); (2) Life Cycle View (For establishment of a firm and stable foundation for a program); (3) Training and Orientation (For thermographers as well as operators, managers and others); (4) Analyst Flexibility (To innovate, explore and develop their understanding of machinery condition); (5) Reports and Program Justification (For program visibility and continued expansion); (6) Commitment to Continuous Improvement of Capability and Productivity (Through application of updated hardware and software); (7) Mutual Support by Analysts (By those inside and outside of the immediate organization); (8) Use of Multiple Technologies and System Experts to Help Define Problems (Through the use of correlation analysis of data from up to 15 technologies. An example correlation analysis table for AC and DC motors is provided.); (9) Root Cause Analysis (Allows a shift from reactive to proactive stance for a program); (10) Master Equipment Identification and Technology Application (To place the condition monitoring program in perspective); (11) Use of procedures for Predictive, Condition Monitoring and maintenance in general (To get consistent results); (12) Developing a scheme for predictive, condition monitoring personnel qualification and certification (To provide a career path and incentive to advance skill level and value to the company); (13) Analyst Assignment to Technologies and Related Duties (To make intelligent use of the skills of individuals assigned); (14) Condition Monitoring Analyst Selection Criteria (Key attributes for success are mentioned.); (15) Design and Modification to Support Monitoring (For old and new machinery to facilitate data acquisition); (16) Establishment of a Museum of Components and Samples Pulled from Service for Cause (For orientation and awareness training of operators and managers and exchange of information between analysts); (17) Goals (To promote a proactive program approach for machinery condition improvement).

  16. Maternal health behaviors and infant health outcomes among homeless mothers: U.S. Special Supplemental Nutrition Program for Women, Infants, and Children (WIC) 2000-2007.

    PubMed

    Richards, Rickelle; Merrill, Ray M; Baksh, Laurie; McGarry, Joanne

    2011-01-01

    To determine whether participation in the Women, Infants, and Children Program is associated with improved maternal and infant health outcomes among homeless women in the Pregnancy Risk Assessment Monitoring System. Analyses were based on Pregnancy Risk Assessment Monitoring System participants from 31 states/cities in the United States, 2000-2007 (n=272,859). Overall, 4% of women completing the Pregnancy Risk Assessment Monitoring System survey were homeless, with 76% participating in the Women, Infants, and Children Program, a federally-funded supplemental nutrition program for low-income women and children less than 5 years old. Among women in the Pregnancy Risk Assessment Monitoring System survey who reported using the Women, Infants, and Children Program, those experiencing homelessness were older, less educated, less likely to have private health insurance, and more likely to receive government assistance. Homeless women in the Women, Infants, and Children Program compared with those not in the program were significantly more likely to have a higher body mass index, to initiate breastfeeding after delivery, have prenatal care visits, have a longer gestational age, and have a greater infant birth weight. Characteristics of homeless pregnant women choosing to participate in the Women, Infants, and Children Program are consistent with the requirements for program participation for women in general. Homeless women accessing the Women, Infants, and Children Program had better maternal and infant health outcomes. Copyright © 2010 Elsevier Inc. All rights reserved.

  17. 2010 Annual Health Physics Report for the HEU Transparency Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Radev, Radoslav

    2011-05-16

    During the 2010 calendar year, Lawrence Livermore National Laboratory (LLNL) provided health physics support for the Highly Enriched Uranium (HEU) Transparency Program for external and internal radiation protection. LLNL also provided technical expertise related to BDMS radioactive sources and Russian radiation safety regulatory compliance. For the calendar year 2010, there were 141 person-trips that required dose monitoring of the U.S. monitors. Of the 141 person-trips, 129 person-trips were Special Monitoring Visits (SMVs) and 12 person-trips were Transparency Monitoring Office (TMO) trips. In 8 of these TMO trips the TMO monitors participated also in the UEIE SMVs and in 2 TMOmore » trips the TMO monitors participated in UEIE and MPA SMVs. There were three monitoring visits (source changes) that were back-to-back SMVs with a total of 25 monitors. LLNL’s Hazard Control Department laboratories provided the dosimetry services for the HEU Transparency monitors.« less

  18. 2016 Annual Site Environmental Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Virginia

    This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. The results of the 2016 environmental surveillance and monitoring program for PPPL’s are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2016. PPPL has engaged in fusion energy research since 1951. The vision of the Laboratory is to create innovations to make fusion power a practical reality – a clean,more » alternative energy source. 2016 marked the eighteenth year of National Spherical Torus Experiment and the first year of NSTX-U (Upgrade) operations. The NSTX-U Project is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. NSTX-U began operations after its first upgrade that installed the new center stack magnets and second neutral beam, which would allow for hotter plasmas and greater field strength to maintain the fusion reaction longer. Due to operational issues with a poloidal coil, NSTX-U operated briefly in 2016. In 2016, PPPL’s radiological environmental monitoring program measured tritium in the air at the NSTX-U Stack and at on -site sampling stations. Using highly sensitive monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of an in- stack monitor located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground and surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment; the data are presented in this report. Ground water monitoring continued under the New Jersey Department of Environmental Protection’s Site Remediation Program. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of chlorinated degreasing solvents). In 2016, PPPL was in compliance with its permit limits for surface and sanitary discharges, excepting two elevated chlorine-produced oxidant concentration. PPPL was honored with awards for its waste reduction and recycling program, and its “EPEAT” electronics purchasing for the third consecutive year.« less

  19. 34 CFR 300.600 - State monitoring and enforcement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... environment. (2) State exercise of general supervision, including child find, effective monitoring, the use of... CHILDREN WITH DISABILITIES Monitoring, Enforcement, Confidentiality, and Program Information Monitoring...) The primary focus of the State's monitoring activities must be on— (1) Improving educational results...

  20. Framework for a ground-water quality monitoring and assessment program for California

    USGS Publications Warehouse

    Belitz, Kenneth; Dubrovsky, Neil M.; Burow, Karen; Jurgens, Bryant C.; John, Tyler

    2003-01-01

    The State of California uses more ground water than any other State in the Nation. With a population of over 30 million people, an agricultural economy based on intensive irrigation, large urban industrial areas, and naturally elevated concentrations of some trace elements, there is a wide range of contaminant sources that have the potential to contaminate ground water and limit its beneficial uses. In response to the many-and different-potential sources of ground-water contamination, the State of California has evolved an extensive set of rules and programs to protect ground-water quality, and agencies to implement the rules and programs. These programs have in common a focus on compliance with regulations governing chemical use and (or) ground-water quality. Although appropriate for, and successful at, their specific missions, these programs do not at present provide a comprehensive view of ground-water quality in the State of California. In October 2001, The California Assembly passed a bill, AB 599, establishing the Ground-Water- Quality Monitoring Act of 2001.' The goal of AB 599 is to improve Statewide comprehensive ground-water monitoring and increase availability of information about ground-water quality to the public. AB 599 requires the State Water Resources Control Board (SWRCB), in collaboration with an interagency task force (ITF) and a public advisory committee (PAC), to develop a plan for a comprehensive ground-water monitoring program. AB 599 specifies that the comprehensive program should be capable of assessing each ground-water basin in the State through direct and other statistically reliable sampling approaches, and that the program should integrate existing monitoring programs and design new program elements, as necessary. AB 599 also stresses the importance of prioritizing ground-water basins that provide drinking water. The United States Geological Survey (USGS), in cooperation with the SWRCB, and in coordination with the ITF and PAC, has developed a framework for a comprehensive ground-water-quality monitoring and assessment program for California. The proposed framework relies extensively on previous work conducted by the USGS through its National Water-Quality Assessment (NAWQA) program. In particular, the NAWQA program defines three types of ground-water assessment: (1) status, the assessment of the current quality of the ground-water resource; (2) trends, the detection of changes in water quality, and (3) understanding, assessing the human and natural factors that affect ground-water quality. A Statewide, comprehensive ground-water quality-monitoring and assessment program is most efficiently accomplished by applying uniform and consistent study-design and data-collection protocols to the entire State. At the same time, a comprehensive program should be relevant at a variety of scales, and therefore needs to retain flexibility to address regional and local issues. Consequently, many of the program components include a predominant element that will be consistently applied in all basins, and a secondary element that may be applied in specific basins where local conditions warrant attention.

  1. Developing the Tools for Geologic Repository Monitoring - Andra's Monitoring R and D Program - 12045

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buschaert, S.; Lesoille, S.; Bertrand, J.

    2012-07-01

    The French Safety Guide recommends that Andra develop a monitoring program to be implemented during repository construction and conducted until (and possibly after) closure, in order to confirm expected behavior and enhance knowledge of relevant processes. To achieve this, Andra has developed an overall monitoring strategy and identified specific technical objectives to inform disposal process management on evolutions relevant to both the long term safety and reversible, pre-closure management of the repository. Andra has launched an ambitious R and D program to ensure that reliable, durable, metrologically qualified and tested monitoring systems will be available at the time of repositorymore » construction in order to respond to monitoring objectives. After four years of a specific R and D program, first observations are described and recommendations are proposed. The results derived from 4 years of Andra's R and D program allow three main observations to be shared. First, while other industries also invest in monitoring equipment, their obvious emphasis will always be on their specific requirements and needs, thus often only providing a partial match with repository requirements. Examples can be found for all available sensors, which are generally not resistant to radiation. Second, the very close scrutiny anticipated for the geologic disposal process is likely to place an unprecedented emphasis on the quality of monitoring results. It therefore seems important to emphasize specific developments with an aim at providing metrologically qualified systems. Third, adapting existing technology to specific repository needs, and providing adequate proof of their worth, is a lengthy process. In conclusion, it therefore seems prudent to plan ahead and to invest wisely in the adequate development of those monitoring tools that will likely be needed in the repository to respond to the implementers' and regulators' requirements, including those agreed and developed to respond to potential stakeholder expectations. (authors)« less

  2. Integrated natural resource monitoring on Army lands and its application to conservation of neotropical birds

    Treesearch

    Timothy J. Hayden; David J. Tazik

    1993-01-01

    The U.S. Army is responsible for managing 5.0 million ha (12.4 million acres) of land on 186 major installations world-wide. The Land Condition Trend Analysis (LCTA) Program is the Army's integrated monitoring and data collection program designed to fulfill the Army's natural resource information and management needs. implementation of this program was...

  3. Virginia's monitoring goals and programs: eastern state perspective

    Treesearch

    Dana Bradshaw

    1993-01-01

    Unlike the federal ownership patterns of the western United States, the eastern states are still largely in the hands of the private landowner. As a result, the implementation of the Partners in Flight program in the East will depend a great deal on the motivation and dedication of individual states. Monitoring programs in particular are in a position to benefit from...

  4. 12 CFR 906.13 - How does the Finance Board oversee and monitor the outreach program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false How does the Finance Board oversee and monitor the outreach program? 906.13 Section 906.13 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses Owned by Minorities, Women, or Individuals...

  5. 1982 HHS/LIHEAP funds used for weatherization. An analysis of data from twenty states: Task A. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-05-01

    During the Summer and Fall of 1982, Arawak Consulting Corporation monitored a number of program management functions of the Low Income Weatherization Assistance Program (WAP) in the 20 states under the jurisdiction of the DOE Chicago Operations Office. The monitoring included on-site visits to all 20 state grantees and 85 randomly selected local subgrantees. Although the monitoring was designed to focus only on the DOE funded program, it soon became apparent that funds from the Department of Health and Human Services' Low Income Home Energy Assistance Program (LIHEAP) often had a significant effect on the scope and mode of operationmore » of the weatherization program. As a result of these and other outcomes, DOE asked Arawak to further study the impact of HHS funds on the Weatherization Assistance Program in the same 20 states. This report is the result of that request. It draws on information collected during the monitoring visits which were conducted from mid-July to mid-October 1982, and on additional information obtained in telephone interviews during the last two weeks of February 1983.« less

  6. Measuring Success in Obesity Prevention: A Synthesis of Health Promotion Switzerland's Long-Term Monitoring and Evaluation Strategy

    PubMed Central

    Ackermann, Günter; Kirschner, Michael; Guggenbühl, Lisa; Abel, Bettina; Klohn, Axel; Mattig, Thomas

    2015-01-01

    Aims Since 2007, Health Promotion Switzerland has implemented a national priority program for a healthy body weight. This article provides insight into the methodological challenges and results of the program evaluation. Methods Evaluation of the long-term program required targeted monitoring and evaluation projects addressing different outcome levels. The evaluation was carried out according to the Swiss Model for Outcome Classification (SMOC), a model designed to classify the effects of health promotion and prevention efforts. Results The results presented in this article emphasize both content and methods. The national program successfully achieved outcomes on many different levels within complex societal structures. The evaluation system built around the SMOC enabled assessment of program progress and the development of key indicators. However, it is not possible to determine definitively to what extent the national program helped stabilize the prevalence of obesity in Switzerland. Conclusion The model has shown its utility in providing a basis for evaluation and monitoring of the national program. Continuous analysis of data from evaluation and monitoring has made it possible to check the plausibility of suspected causal relationships as well as to establish an overall perspective and assessment of effectiveness supported by a growing body of evidence. PMID:25765161

  7. The Maryland power plant research program internet resource for precipitation chemistry data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Corio, L.A.; Jones, W.B.; Sherwell, J.

    1999-07-01

    The Maryland Department of Natural Resources Power Plant Research Program (PPRP) initiated a project in 1998 to make available on the World Wide Web (WWW), precipitation chemistry data from monitoring sites located in the Chesapeake Bay watershed. To that end, PPRP obtained, from various organizations, background information on atmospheric deposition monitoring programs (some of which are still on-going), as well as special studies. For those programs and studies with available precipitation chemistry data of known quality (data were not available for all programs and studies), PPRP obtained, processed, and uploaded the data to its WWW site (www.versar.com/pprp/features/aciddep/aciddep.htm). These data canmore » either be viewed on the web site or downloaded as a zipped file in either comma-delimited or Excel spreadsheet format. PPRP also provides descriptions of the monitoring programs/studies, including information on measurement methods and quality assurance procedures, where available. For the few monitoring programs (e.g., NADP) with existing web sites that allow on-line access to data, PPRP provides links to these sites. PPRP currently is working with the National Oceanic and Atmospheric Administration (NOAA) Air Resources Laboratory (ARL) in a cooperative effort to make more precipitation chemistry data easily available to the scientific community.« less

  8. 28 CFR 66.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performance. 66.40 Section 66.40 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) UNIFORM... Requirements Reports, Records, Retention, and Enforcement § 66.40 Monitoring and reporting program performance... assure compliance with applicable Federal requirements and that performance goals are being achieved...

  9. Atmospheric Mercury Deposition Monitoring – National Atmospheric Deposition Program (NADP)

    EPA Science Inventory

    The National Atmospheric Deposition Program (NADP) developed and operates a collaborative network of atmospheric mercury monitoring sites based in North America – the Atmospheric Mercury Network (AMNet). The justification for the network was growing interest and demand from many ...

  10. Probability Surveys, Conditional Probability, and Ecological Risk Assessment

    EPA Science Inventory

    We show that probability-based environmental resource monitoring programs, such as the U.S. Environmental Protection Agency’s (U.S. EPA) Environmental Monitoring and Assessment Program, and conditional probability analysis can serve as a basis for estimating ecological risk over ...

  11. Establishing monitoring programs for travel time reliability. [supporting datasets

    DOT National Transportation Integrated Search

    2014-01-01

    The objective of this project was to develop system designs for programs to monitor travel time reliability and to prepare a guidebook that practitioners and others can use to design, build, operate, and maintain such systems. Generally, such travel ...

  12. Monitoring clinical standards in a chronic peritoneal dialysis program.

    PubMed

    Leung, Dora K C

    2009-02-01

    Multiple factors may influence the effectiveness of a chronic peritoneal dialysis program. Continuous monitoring of various aspects of clinical standards with reviews enhances opportunities for bridging the gap between existing practice and good practice, and good practice to best practice.

  13. Elk-effects vegetation monitoring program for Tomales Point Elk Range, Point Reyes National Seashore, California

    USGS Publications Warehouse

    McEachern, Kathryn; Semenoff-Irving, Marcia; van der Leeden, Pamela

    2000-01-01

    The monitoring program for elk effects on Tomales Point vegetation is designed to provide information on how tule elk grazing affects plant communities and rare species. The basic objective of the program is to show whether the elk are driving the vegetation into an unacceptable state by their grazing. The expectation is that as elk numbers increase, grazing pressure will increase too, resulting in unacceptable levels of any or all of the following: low vegetation ground cover, poor nutritional quality for the elk, undesirable increases in weedy species, unacceptable loss of native plant biodiversity, population declines in rare plants, population declines in plants used for food and nectar by the endangered silverspot butterfly, and increased erosion.The monitoring program has 3 basic components designed to provide complementary information on different aspects of the elk-vegetation system. Long-term plant community monitoring along permanent transects will show how plant species composition and cover are changing since cattle removal in 1979, and it will show whether any of he undesirable traits listed above are developing in the vegetation. However, monitoring these transects alone will not tell us what the effects of continued grazing by elk are apart from changes the vegetation would be undergoing anyway. In order to tease apart the elk effects from change that is happening because of cattle removal, elk exclosures are needed. By sampling inside and outside exclosures, we will be able to see how elk are modifying the rates and directions of change in the vegetation that would be happening in their absence. In a sense, the exclosures serve as a “check” on elk effects. They will allow us to interpret how much of the change is due to elk and how much can be attributed to other processes such as natural succession or weather patterns. This information will allow us to analyze whether changing elk management will have a desirable effect on the vegetation. Finally, periodic mapping and counting of plants in rare plant populations will show whether plant population ranges are expanding and populations are stable or growing. If not, then management actions can be taken to improve habitat conditions for the plants.A general summary of the rationale and sample design for each of the 3 components of the elk-effects monitoring program follows. Field sampling for the entire program should require about 15 weeks for a 2 to 3- person team, and data processing, analysis, and report writing should require about 9 weeks. Time and labor estimates for this program are given in Table A-1. In addition to elk-effects monitoring, Point Reyes staff periodically monitor fire transects and residual dry matter plots on Tomales Point. They are not included as part of the elk-effects monitoring program and they are described elsewhere. Protocols for fire and residual dry matter sampling are not included in the time estimate for the elk- effects monitoring program.

  14. Aspect-Oriented Monitoring of C Programs

    NASA Technical Reports Server (NTRS)

    Havelund, Klaus; VanWyk, Eric

    2008-01-01

    The paper presents current work on extending ASPECTC with state machines, resulting in a framework for aspect-oriented monitoring of C programs. Such a framework can be used for testing purposes, or it can be part of a fault protection strategy. The long term goal is to explore the synergy between the fields of runtime verification, focused on program monitoring, and aspect-oriented programming, focused on more general program development issues. The work is inspired by the observation that most work in this direction has been done for JAVA, partly due to the lack of easily accessible extensible compiler frameworks for C. The work is performed using the SILVER extensible attribute grammar compiler framework, in which C has been defined as a host language. Our work consists of extending C with ASPECTC, and subsequently to extend ASPECTC with state machines.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA ECOLOGICAL SERVICES

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test andmore » Evaluation Complex (NPTEC).« less

  16. St. Louis airport site annual environmental report for calendar year 1990, St. Louis, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-08-01

    Environmental monitoring of the US Department of Energy's (DOE) St. Louis Airport Site (SLAPS) and surrounding area began in 1984. SLAPS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs,more » and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program demonstrated that the concentrations of contaminants of concern were all below applicable standards, ARARs, and guidelines. Site activities in 1990 were limited to maintenance. SLAPS was in compliance with all applicable regulations during 1990 and has remained in compliance since 1984, when the environmental monitoring program and remedial action began.« less

  17. Data Quality Objectives Supporting the Environmental Soil Monitoring Program for the Idaho National Laboratory Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haney, Thomas Jay

    This document describes the process used to develop data quality objectives for the Idaho National Laboratory (INL) Environmental Soil Monitoring Program in accordance with U.S. Environmental Protection Agency guidance. This document also develops and presents the logic that was used to determine the specific number of soil monitoring locations at the INL Site, at locations bordering the INL Site, and at locations in the surrounding regional area. The monitoring location logic follows the guidance from the U.S. Department of Energy for environmental surveillance of its facilities.

  18. Cycle 24 COS FUV Internal/External Wavelength Scale Monitor

    NASA Astrophysics Data System (ADS)

    Fischer, William J.

    2018-02-01

    We report on the monitoring of the COS FUV wavelength scale zero-points during Cycle 24 in program 14855. Select cenwaves were monitored for all FUV gratings at Lifetime Position 3. The target and cenwaves have remained the same since Cycle 21, with a change only to the target acquisition sequence. All measured offsets are within the error goals, although the G140L cenwaves show offsets at the short-wavelength end of segment A that are approaching the tolerance. This behavior will be closely monitored in subsequent iterations of the program.

  19. WFC3 Cycle 19 Calibration Program

    NASA Astrophysics Data System (ADS)

    Sabbi, E.; WFC3 Team

    2012-03-01

    The Cycle 19 WFC3 Calibration Program runs from October 2011 through September 2012 and is designed to measure and monitor the behavior of both the UVIS and IR channels. The program was prepared with the actual usage of WFC3 in mind, to provide the best calibration data and reference les for the approved scientic programs. During Cycle 19 the WFC3 team is using 125 external and 1587 internal orbits of HST time divided in 29 di erent programs, grouped in six categories: Monitor, Photometry, Spectroscopy, Detectors, Flat-elds, and Image Quality

  20. A brief overview of channel monitoring in land management: Five case studies. Case study #1

    Treesearch

    Leslie Reid

    1999-01-01

    Yesterday we heard about some successful monitoring programs,but today I would like to share some findings from a study I did, which was basically a post-mortem of failed monitoring programs.There were about 30 projects,and I wanted to know why did they fail,and were there patterns of why they failed.The projects ranged from university studies,land management,and...

  1. National Forest Health Monitoring Program, Monitoring Urban Forests in Indiana: Pilot Study 2002, Part 2: Statewide Estimates Using the UFORE Model

    Treesearch

    David Nowak; Anne Buckelew Cumming; Daniel Twardus; Robert Hoehn; Manfred Mielke

    2007-01-01

    Trees in cities can improve environmental quality and human health. Unfortunately, little is known about the urban forest resource and what and how it contributes to local, regional, and national societies and economies. To better understand the urban forest resource and its value, the Forest Service, U.S. Department of Agriculture, Forest Health Monitoring Program...

  2. FutureGen 2.0 Monitoring Program: An Overview of the Monitoring Approach and Technologies Selected for Implementation

    DOE PAGES

    Vermeul, Vince R.; Strickland, Chris E.; Thorne, Paul D.; ...

    2014-12-31

    The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to 1) evaluate CO2 mass balance and 2) detect any unforeseen loss in CO2 containment. The monitoring program will include direct monitoring of the injection stream and reservoir, and early-leak-detection monitoring directly above the primary confining zone. It will also implement an adaptive monitoringmore » strategy whereby monitoring results are continually evaluated and the monitoring network is modified as required, including the option to drill additional wells in out-years. Wells will be monitored for changes in CO2 concentration and formation pressure, and other geochemical/isotopic signatures that provide indication of CO2 or brine leakage. Indirect geophysical monitoring technologies that were selected for implementation include passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture logging. Near-surface monitoring approaches that have been initiated include surficial aquifer and surface- water monitoring, soil-gas monitoring, atmospheric monitoring, and hyperspectral data acquisition for assessment of vegetation conditions. Initially, only the collection of baseline data sets is planned; the need for additional near- surface monitoring will be continually evaluated throughout the design and operational phases of the project, and selected approaches may be reinstituted if conditions warrant. Given the current conceptual understanding of the subsurface environment, early and appreciable impacts to near-surface environments are not expected.« less

  3. Data-quality measures for stakeholder-implemented watershed-monitoring programs

    USGS Publications Warehouse

    Greve, Adrienne I.

    2002-01-01

    Community-based watershed groups, many of which collect environmental data, have steadily increased in number over the last decade. The data generated by these programs are often underutilized due to uncertainty in the quality of data produced. The incorporation of data-quality measures into stakeholder monitoring programs lends statistical validity to data. Data-quality measures are divided into three steps: quality assurance, quality control, and quality assessment. The quality-assurance step attempts to control sources of error that cannot be directly quantified. This step is part of the design phase of a monitoring program and includes clearly defined, quantifiable objectives, sampling sites that meet the objectives, standardized protocols for sample collection, and standardized laboratory methods. Quality control (QC) is the collection of samples to assess the magnitude of error in a data set due to sampling, processing, transport, and analysis. In order to design a QC sampling program, a series of issues needs to be considered: (1) potential sources of error, (2) the type of QC samples, (3) inference space, (4) the number of QC samples, and (5) the distribution of the QC samples. Quality assessment is the process of evaluating quality-assurance measures and analyzing the QC data in order to interpret the environmental data. Quality assessment has two parts: one that is conducted on an ongoing basis as the monitoring program is running, and one that is conducted during the analysis of environmental data. The discussion of the data-quality measures is followed by an example of their application to a monitoring program in the Big Thompson River watershed of northern Colorado.

  4. Development of the Diabetes Technology Society Blood Glucose Monitor System Surveillance Protocol.

    PubMed

    Klonoff, David C; Lias, Courtney; Beck, Stayce; Parkes, Joan Lee; Kovatchev, Boris; Vigersky, Robert A; Arreaza-Rubin, Guillermo; Burk, Robert D; Kowalski, Aaron; Little, Randie; Nichols, James; Petersen, Matt; Rawlings, Kelly; Sacks, David B; Sampson, Eric; Scott, Steve; Seley, Jane Jeffrie; Slingerland, Robbert; Vesper, Hubert W

    2016-05-01

    Inaccurate blood glucsoe monitoring systems (BGMSs) can lead to adverse health effects. The Diabetes Technology Society (DTS) Surveillance Program for cleared BGMSs is intended to protect people with diabetes from inaccurate, unreliable BGMS products that are currently on the market in the United States. The Surveillance Program will provide an independent assessment of the analytical performance of cleared BGMSs. The DTS BGMS Surveillance Program Steering Committee included experts in glucose monitoring, surveillance testing, and regulatory science. Over one year, the committee engaged in meetings and teleconferences aiming to describe how to conduct BGMS surveillance studies in a scientifically sound manner that is in compliance with good clinical practice and all relevant regulations. A clinical surveillance protocol was created that contains performance targets and analytical accuracy-testing studies with marketed BGMS products conducted by qualified clinical and laboratory sites. This protocol entitled "Protocol for the Diabetes Technology Society Blood Glucose Monitor System Surveillance Program" is attached as supplementary material. This program is needed because currently once a BGMS product has been cleared for use by the FDA, no systematic postmarket Surveillance Program exists that can monitor analytical performance and detect potential problems. This protocol will allow identification of inaccurate and unreliable BGMSs currently available on the US market. The DTS Surveillance Program will provide BGMS manufacturers a benchmark to understand the postmarket analytical performance of their products. Furthermore, patients, health care professionals, payers, and regulatory agencies will be able to use the results of the study to make informed decisions to, respectively, select, prescribe, finance, and regulate BGMSs on the market. © 2015 Diabetes Technology Society.

  5. 14 CFR 1273.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance. 1273.40 Section 1273.40 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day... assure compliance with applicable Federal requirements and that performance goals are being achieved...

  6. Cumulative distribution functions and their use in monitoring programs

    EPA Science Inventory

    Ecological resource monitoring programs typically have estimating the status and change in status as an objective. A well designed and skillfully implemented survey design will produce an accurate representation of the status of the resource at the time the survey was conducted....

  7. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 435.51 Section 435.51 Employees' Benefits SOCIAL SECURITY ADMINISTRATION UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT...

  8. U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: ARSENIC MONITORING TECHNOLOGIES

    EPA Science Inventory

    The U.S. Environmental Protection Agency Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This technology ...

  9. 40 CFR 35.6755 - Monitoring program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Monitoring program performance. 35.6755 Section 35.6755 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund...

  10. 40 CFR 35.6755 - Monitoring program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Monitoring program performance. 35.6755 Section 35.6755 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund...

  11. A FRAMEWORK FOR AN INTEGRATED MONITORING PLAN FOR THE GULF OF MEXICO ECOSYSTEM

    EPA Science Inventory

    The Gulf of Mexico Program (GMP) Office in cooperation with its principal partners (Gulf State agencies, Federal agencies, private industry, etc.) and the Environmental Protection Agency's (EPA) Environmental Monitoring and Assessment Program (EMAP) are developing an integrated c...

  12. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  13. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  14. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  15. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  16. 40 CFR 257.25 - Assessment monitoring program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Assessment monitoring program. 257.25 Section 257.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA... unit caused the contamination, or that the statistically significant increase resulted from error in...

  17. ASSESSING THE SUITABILITY OF WINDBREAKS AS WILDLIFE HABITAT - 1994 PILOT PLAN

    EPA Science Inventory

    The Environmental Monitoring and Assessment Program's (EMAP) Agroecosystem Resource Group is developing a program to monitor and evaluate the ecological condition of United States agricultural lands. indbreaks are an important non-crop element in the Great Plains, an extensive ag...

  18. SUPERFUND INNOVATIVE TECHNOLOGIES EVALUATION (SITE) PROGRAM FOR MONITORING AND CHARACTERIZATION TECHNOLOGIES

    EPA Science Inventory

    This task seeks to identify high priority needs of the Regions and Program Offices for innovative field sampling, characterization, monitoring, and measurement technologies. When an appropriate solution to a specific problem is identified, a field demonstration is conducted to d...

  19. 40 CFR 270.31 - Requirements for recording and reporting of monitoring results.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results. 270.31 Section 270.31 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Permit Conditions § 270.31 Requirements for recording and reporting of monitoring results. All...

  20. 40 CFR 270.31 - Requirements for recording and reporting of monitoring results.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results. 270.31 Section 270.31 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Permit Conditions § 270.31 Requirements for recording and reporting of monitoring results. All...

  1. 40 CFR 270.31 - Requirements for recording and reporting of monitoring results.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results. 270.31 Section 270.31 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Permit Conditions § 270.31 Requirements for recording and reporting of monitoring results. All...

  2. 40 CFR 270.31 - Requirements for recording and reporting of monitoring results.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results. 270.31 Section 270.31 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Permit Conditions § 270.31 Requirements for recording and reporting of monitoring results. All...

  3. 40 CFR 270.31 - Requirements for recording and reporting of monitoring results.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... representative of the monitored activity including, when appropriate, continuous monitoring; (c) Applicable... reporting of monitoring results. 270.31 Section 270.31 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Permit Conditions § 270.31 Requirements for recording and reporting of monitoring results. All...

  4. Colonie Interim Storage Site annual environmental report for calendar year 1991, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Colonie Interim Storage Site (CISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at CISS began in 1984 when Congress added the site to the US Department of Energy`s Formerly Utilized Sites Remedial Action Program. CISS property and surrounding areas were radioactively contaminated by operations conducted by National Lead Industries, which manufactured various components from uranium and thorium from 1958 to 1984. The environmental monitoring program at CISS includes sampling networks for external gamma radiation exposure and for radium-226, thorium-232, and total uranium concentrations inmore » surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. In 1992 the program will also include sampling networks for radioactive and chemical contaminants in stormwater to meet permit application requirements under the Clean Water Act. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE.orders. Environmental standards are established to protect public health and the environment. Results of environmental monitoring during 1991 indicate that average concentrations of radioactive contaminants of concern were well below applicable standards and DCGS. Concentrations of some chemical contaminants in groundwater were above-the New York State Department of Environmental Conservation (Class GA) and EPA guidelines for drinking water. The potential annual radiation exposure (excluding background) calculated for a hypothetical maximally exposed individual is 0.23 mrem (milliroentgen equivalent man), which is less than an individual would receive while traveling in an airplane at 12,000 meters (39,000 feet) for one hour.« less

  5. 2005 Annual Health Physics Report for HEU Transparency Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Radev, R

    2006-04-21

    During the 2005 calendar year, LLNL provided health physics support for the Highly Enriched Uranium Transparency Program (HEU-TP) in external and internal radiation protection and technical expertise into matters related to BDMS radioactive sources and Russian radiation safety regulatory compliance. For the calendar year 2005, there were 161 person-trips that required dose monitoring of the U.S. monitors. Of the 161 person-trips, 149 person-trips were SMVs and 12 person-trips were Transparency Monitoring Office (TMO) trips. Additionally, there were 11 monitoring visits by TMO monitors to facilities other than UEIE and 3 to UEIE itself. There were two monitoring visits (source changes)more » that were back to back with 16 monitors. Each of these concurring visits were treated as single person-trips for dosimetry purposes. Counted individually, there were 191 individual person-visits in 2005. The LLNL Safety Laboratories Division provided the dosimetry services for the HEU-TP monitors.« less

  6. ReactorHealth Physics operations at the NIST center for neutron research.

    PubMed

    Johnston, Thomas P

    2015-02-01

    Performing health physics and radiation safety functions under a special nuclear material license and a research and test reactor license at a major government research and development laboratory encompasses many elements not encountered by industrial, general, or broad scope licenses. This article reviews elements of the health physics and radiation safety program at the NIST Center for Neutron Research, including the early history and discovery of the neutron, applications of neutron research, reactor overview, safety and security of radiation sources and radioactive material, and general health physics procedures. These comprise precautions and control of tritium, training program, neutron beam sample processing, laboratory audits, inventory and leak tests, meter calibration, repair and evaluation, radioactive waste management, and emergency response. In addition, the radiation monitoring systems will be reviewed including confinement building monitoring, ventilation filter radiation monitors, secondary coolant monitors, gaseous fission product monitors, gas monitors, ventilation tritium monitor, and the plant effluent monitor systems.

  7. Long-term Monitoring Program Optimization for Chlorinated Volatile Organic Compound Plume, Naval Air Station Brunswick, Maine

    NASA Astrophysics Data System (ADS)

    Calderone, G. M.

    2006-12-01

    A long-term monitoring program was initiated in 1995 at 6 sites at NAS Brunswick, including 3 National Priorities List (Superfund) sites. Primary contaminants of concern include chlorinated volatile organic compounds, including tetrachloroethane, trichloroethene, and vinyl chloride, in addition to metals. More than 80 submersible pumping systems were installed to facilitate sample collection utilizing the low-flow sampling technique. Long-term monitoring of the groundwater is conducted to assess the effectiveness of remedial measures, and monitor changes in contaminant concentrations in the Eastern Plume Operable Unit. Long-term monitoring program activities include quarterly groundwater sampling and analysis at more than 90 wells across 6 sites; surface water, sediment, seep, and leachate sampling and analysis at 3 sites; landfill gas monitoring; well maintenance; engineering inspections of landfill covers and other sites or evidence of stressed vegetation; water level gauging; and treatment plant sampling and analysis. Significant cost savings were achieved by optimizing the sampling network and reducing sampling frequency from quarterly to semi- annual or annual sampling. As part of an ongoing optimization effort, a geostatistical assessment of the Eastern Plume was conducted at the Naval Air Station, Brunswick, Maine. The geostatistical assessment used 40 monitoring points and analytical data collected over 3 years. For this geostatistical assessment, EA developed and utilized a database of analytical results generated during 3 years of long-term monitoring which was linked to a Geographic Information System to enhance data visualization capacity. The Geographic Information System included themes for groundwater volatile organic compound concentration, groundwater flow directions, shallow and deep wells, and immediate access to point-specific analytical results. This statistical analysis has been used by the site decision-maker and its conclusions supported a significant reduction in the Long-Term Monitoring Program.

  8. DEVELOPMENT OF EMERGING TECHNOLOGIES WITHIN THE SITE PROGRAM

    EPA Science Inventory

    The Site Program is formed by five research programs: the Demonstration Program, the Emerging Technology Program, the Measurement and Monitoring Technology Development Program, the Innovative Technology Program, and the Technology Transfer Program. The Emerging Technology (ET) P...

  9. Legal implications of monitoring workers for carcinogenic and mutagenic risk.

    PubMed

    Damme, C J

    1982-01-01

    Many industries have initiated testing programs designed to identify workers who are especially vulnerable to workplace assaults by carcinogenic or mutagenic agents. This paper examines a number of legal issues attendant on such programs, including disclosure and consent, confidentiality, and other potential liability-producing factors. This paper also briefly looks at the legal issues that might arise if the federal government were to mandate similar programs. Finally, the basic rationale of industrial monitoring programs is discussed within the context of the emerging legal issues.

  10. Personnel Radiation Exposure Associated With X-Rays Emanating from U.S. Coast Guard LORAN High Voltage Vacuum Tube Transmitter Units

    DTIC Science & Technology

    2011-07-01

    dosimeter program. Unfortunately, this limited personnel monitoring program did not address the case of an individual who may have performed...and forearms; feet and ankles 18 ¾ Skin of whole body 7 ½ The USCG does maintain a small radiation personnel dosimeter monitoring program for x...ray technicians at USCG medical clinics (USCG, 2006). This medical clinic dosimeter program reflects a civilian standard of practice, where the x-ray

  11. In Vivo Monitoring Program Manual, PNL-MA-574

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2010-07-01

    An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

  12. Cost-Effective Large-Scale Occupancy–Abundance Monitoring of Invasive Brushtail Possums (Trichosurus Vulpecula) on New Zealand’s Public Conservation Land

    PubMed Central

    Gormley, Andrew M.; Forsyth, David M.; Wright, Elaine F.; Lyall, John; Elliott, Mike; Martini, Mark; Kappers, Benno; Perry, Mike; McKay, Meredith

    2015-01-01

    There is interest in large-scale and unbiased monitoring of biodiversity status and trend, but there are few published examples of such monitoring being implemented. The New Zealand Department of Conservation is implementing a monitoring program that involves sampling selected biota at the vertices of an 8-km grid superimposed over the 8.6 million hectares of public conservation land that it manages. The introduced brushtail possum (Trichosurus Vulpecula) is a major threat to some biota and is one taxon that they wish to monitor and report on. A pilot study revealed that the traditional method of monitoring possums using leg-hold traps set for two nights, termed the Trap Catch Index, was a constraint on the cost and logistical feasibility of the monitoring program. A phased implementation of the monitoring program was therefore conducted to collect data for evaluating the trade-off between possum occupancy–abundance estimates and the costs of sampling for one night rather than two nights. Reducing trapping effort from two nights to one night along four trap-lines reduced the estimated costs of monitoring by 5.8% due to savings in labour, food and allowances; it had a negligible effect on estimated national possum occupancy but resulted in slightly higher and less precise estimates of relative possum abundance. Monitoring possums for one night rather than two nights would provide an annual saving of NZ$72,400, with 271 fewer field days required for sampling. Possums occupied 60% (95% credible interval; 53–68) of sampling locations on New Zealand’s public conservation land, with a mean relative abundance (Trap Catch Index) of 2.7% (2.0–3.5). Possum occupancy and abundance were higher in forest than in non-forest habitats. Our case study illustrates the need to evaluate relationships between sampling design, cost, and occupancy–abundance estimates when designing and implementing large-scale occupancy–abundance monitoring programs. PMID:26029890

  13. Ecoregional-scale monitoring within conservation areas, in a rapidly changing climate

    USGS Publications Warehouse

    Beever, Erik A.; Woodward, Andrea

    2011-01-01

    Long-term monitoring of ecological systems can prove invaluable for resource management and conservation. Such monitoring can: (1) detect instances of long-term trend (either improvement or deterioration) in monitored resources, thus providing an early-warning indication of system change to resource managers; (2) inform management decisions and help assess the effects of management actions, as well as anthropogenic and natural disturbances; and (3) provide the grist for supplemental research on mechanisms of system dynamics and cause-effect relationships (Fancy et al., 2009). Such monitoring additionally provides a snapshot of the status of monitored resources during each sampling cycle, and helps assess whether legal standards and regulations are being met. Until the last 1-2 decades, tracking and understanding changes in condition of natural resources across broad spatial extents have been infrequently attempted. Several factors, however, are facilitating the achievement of such broad-scale investigation and monitoring. These include increasing awareness of the importance of landscape context, greater prevalence of regional and global environmental stressors, and the rise of landscape-scale programs designed to manage and monitor biological systems. Such programs include the US Forest Service's Forest Inventory and Analysis (FIA) Program (Moser et al., 2008), Canada's National Forest Inventory, the 3Q Programme for monitoring agricultural landscapes of Norway (Dramstad et al., 2002), and the emerging (US) Landscape Conservation Cooperatives (USDOI Secretarial Order 3289, 2009; Anonymous, 2011). This Special Section explores the underlying design considerations, as well as many pragmatic aspects associated with program implementation and interpretation of results from broad-scale monitoring systems, particularly within the constraints of high-latitude contexts (e.g., low road density, short field season, dramatic fluctuations in temperature). Although Alaska is the focus of most papers in this Special Section, we posit that many of the issues that characterize the remote, relatively undisturbed ecosystems of high northern latitudes are widespread and thus applicable to natural-resource management and conservation across northern portions of the Holarctic ecozone and indeed anywhere broad-scale monitoring is contemplated.

  14. Demonstration of innovative monitoring technologies at the Savannah River Integrated Demonstration Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rossabi, J.; Jenkins, R.A.; Wise, M.B.

    1993-12-31

    The Department of Energy`s Office of Technology Development initiated an Integrated Demonstration Program at the Savannah River Site in 1989. The objective of this program is to develop, demonstrate, and evaluate innovative technologies that can improve present-day environmental restoration methods. The Integrated Demonstration Program at SRS is entitled ``Cleanup of Organics in Soils and Groundwater at Non-Arid Sites.`` New technologies in the areas of drilling, characterization, monitoring, and remediation are being demonstrated and evaluated for their technical performance and cost effectiveness in comparison with baseline technologies. Present site characterization and monitoring methods are costly, time-consuming, overly invasive, and often imprecise.more » Better technologies are required to accurately describe the subsurface geophysical and geochemical features of a site and the nature and extent of contamination. More efficient, nonintrusive characterization and monitoring techniques are necessary for understanding and predicting subsurface transport. More reliable procedures are also needed for interpreting monitoring and characterization data. Site characterization and monitoring are key elements in preventing, identifying, and restoring contaminated sites. The remediation of a site cannot be determined without characterization data, and monitoring may be required for 30 years after site closure.« less

  15. 40 CFR 52.480 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of Columbia's Department of Consumer and Regulatory Affairs submitted a plan for the establishment... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Photochemical Assessment Monitoring Stations (PAMS) Program. 52.480 Section 52.480 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  16. 7 CFR 3016.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Monitoring and reporting program performance. 3016.40 Section 3016.40 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE...

  17. COMMUNITY-MONITORING PROGRAM SURROUNDING THE NEVADA TEST SITE: ONE YEAR OF EXPERIENCE

    EPA Science Inventory

    Since 1954, the US Public Health Service and later the US Environmental Protection Agency Laboratory in Las Vegas, Nevada, have been responsible for conducting a program of environmental radiation monitoring and public radiation safety associated with nuclear weapons tests conduc...

  18. Magnetic-Based NDE of Prestressed and Post-Tensioned Concrete Members: The MFL System.

    DOT National Transportation Integrated Search

    1997-07-01

    Many metropolitan areas have begun or are planning to implement traffic monitoring programs to meet the many demands for traffic data. The purpose of this project is to document a series of examples of urban traffic monitoring data collection program...

  19. The Effects of Monitoring the Use of Gentamicin in a Community Hospital

    ERIC Educational Resources Information Center

    Gilbert, David N.; And Others

    1978-01-01

    The effect of a combined education and monitoring program on the use of gentamicin in a community hospital is described. The data support the tenet that the ways antibiotics are used can be altered by an education program. (Author/LBH)

  20. U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: MERCURY CONTINUOUS EMISSION MONITORS

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techn...

  1. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  2. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  3. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  4. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  5. DATA QUALITY OBJECTIVES-FOUNDATION OF A SUCCESSFUL MONITORING PROGRAM

    EPA Science Inventory

    The data quality objectives (DQO) process is a fundamental site characterization tool and the foundation of a successful monitoring program. The DQO process is a systematic planning approach based on the scientific method of inquiry. The process identifies the goals of data col...

  6. 40 CFR 52.430 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Photochemical Assessment Monitoring Stations (PAMS) Program. 52.430 Section 52.430 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Natural Resources & Environmental Control submitted a plan for the establishment and implementation of a...

  7. Computer program analyzes and monitors electrical power systems (POSIMO)

    NASA Technical Reports Server (NTRS)

    Jaeger, K.

    1972-01-01

    Requirements to monitor and/or simulate electric power distribution, power balance, and charge budget are discussed. Computer program to analyze power system and generate set of characteristic power system data is described. Application to status indicators to denote different exclusive conditions is presented.

  8. 29 CFR 1470.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 1470.40 Section 1470.40 Labor Regulations Relating to Labor (Continued) FEDERAL MEDIATION AND CONCILIATION SERVICE... not met. (iii) Additional pertinent information including, when appropriate, analysis and explanation...

  9. THE ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM: NATIONAL COASTAL ASSESSMENT - LESSONS LEARNED

    EPA Science Inventory

    The purpose of the Environmental Monitoring and Assessment Program's National Coastal Assessment is to estimate the current status, extent, changes, and trends in ecological indicators of the condition of the nation's coastal resources on a state, regional and national basis. Bas...

  10. THE U.S. EVIRONMENTAL PROTECTION AGENCY ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM—AN OVERVIEW

    EPA Science Inventory

    This is an article about monitoring technologies in the Environmental Technolgy Verification (ETV) Program which will be published in the Journal of Occupational And Environmental Hygiene. This article gives an overview of the entire ETV program with emphasis on monitoring techn...

  11. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM RESEARCH STRATEGY, JULY 2002

    EPA Science Inventory

    The U.S. Environmental Protection Agency's (EPA) Environmental Monitoring and Assessment Program (EMAP) is a long-term research effort to enable status and trends assessments of aquatic ecosystems across the U.S. with known statistical confidence. Initiated in the late 1980's wi...

  12. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM-SURFACE WATERS WESTERN PILOT STUDY: FIELD OPERATIONS MANUAL FOR WADEABLE STREAMS

    EPA Science Inventory

    This document describes field procedures that were used during the Environmental Monitoring and Assessment Program (EMAP) Western Pilot Study, conducted from 1999 through 2004. Objectives for EMAP involve developing appropriate scientific and technical tools for evaluating ecolo...

  13. 34 CFR 668.167 - FFEL Program funds.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF EDUCATION STUDENT ASSISTANCE GENERAL PROVISIONS Cash Management § 668.167 FFEL Program funds... limitations contained in paragraph (d) of this section. (f) An institution placed under the cash monitoring payment method. The Secretary may require an institution that is placed under the cash monitoring...

  14. 34 CFR 668.167 - FFEL Program funds.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF EDUCATION STUDENT ASSISTANCE GENERAL PROVISIONS Cash Management § 668.167 FFEL Program funds... limitations contained in paragraph (d) of this section. (f) An institution placed under the cash monitoring payment method. The Secretary may require an institution that is placed under the cash monitoring...

  15. Yucca Mountain Biological Resources Monitoring Program. Progress report, January 1994--December 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-07-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize the suitability of Yucca Mountain as a potential geological repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a potential repository. To ensure that site characterization activities do not adversely affect the environment at Yucca Mountain, a program has been implemented to monitor and mitigate potential impacts and ensure activities comply with applicable environmental regulations. Thismore » report describes the activities and accomplishments of EG and G Energy Measurements, Inc. (EG and G/EM) from January 1994 through December 1994 for six program areas within the Terrestrial Ecosystem component of the environmental program for the Yucca Mountain Site Characterization Project (YMP): Site Characterization Effects, Desert Tortoises (Gopherus agassizii), Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.« less

  16. Case studies of capacity building for biodiversity monitoring: Chapter 13

    USGS Publications Warehouse

    Schmeller, Dirk S.; Arvanitidis, Christos; Böhm, Monika; Brummitt, Neil; Chatzinikolaou, Eva; Costello, Mark J.; Ding, Hui; Gill, Michael J.; Haase, Peter; Juillard, Romain; García-Moreno, Jaime; Pettorelli, Nathalie; Peng, Cui; Riginos, Corinna; Schmiedel, Ute; Simaika, John P.; Waterman, Carly; Wu, Jun; Xu, Haigen; Belnap, Jayne; Walters, Michele; Scholes, Robert J.

    2017-01-01

    Monitoring the status and trends of species is critical to their conservation and management. However, the current state of biodiversity monitoring is insufficient to detect such for most species and habitats, other than in a few localised areas. One of the biggest obstacles to adequate monitoring is the lack of local capacity to carry out such programs. Thus, building the capacity to do such monitoring is imperative. We here highlight different biodiversity monitoring efforts to illustrate how capacity building efforts are being conducted at different geographic scales and under a range of resource, literacy, and training constraints. Accordingly, we include examples of monitoring efforts from within countries (Kenya, France, and China), within regions (Central America and the Arctic) and larger capacity building programs including EDGE (Evolutionarily Distinct and Globally Endangered) of Existence and the National Red List Alliance.

  17. Environmental and biological monitoring for lead exposure in California workplaces.

    PubMed Central

    Rudolph, L; Sharp, D S; Samuels, S; Perkins, C; Rosenberg, J

    1990-01-01

    Patterns of environmental and biological monitoring for lead exposure were surveyed in lead-using industries in California. Employer self-reporting indicates a large proportion of potentially lead-exposed workers have never participated in a monitoring program. Only 2.6 percent of facilities have done environmental monitoring for lead, and only 1.4 percent have routine biological monitoring programs. Monitoring practices vary by size of facility, with higher proportions in industries in which larger facilities predominate. Almost 80 percent of battery manufacturing employees work in job classifications which have been monitored, versus only 1 percent of radiator-repair workers. These findings suggest that laboratory-based surveillance for occupational lead poisoning may seriously underestimate the true number of lead poisoned workers and raise serious questions regarding compliance with key elements of the OSHA Lead Standard. PMID:2368850

  18. 24 CFR 1006.401 - Monitoring of compliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Monitoring and Accountability § 1006.401 Monitoring of compliance. (a) Periodic reviews and monitoring. At least annually, the DHHL must review the activities... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Monitoring of compliance. 1006.401...

  19. 24 CFR 1006.401 - Monitoring of compliance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Monitoring and Accountability § 1006.401 Monitoring of compliance. (a) Periodic reviews and monitoring. At least annually, the DHHL must review the activities... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Monitoring of compliance. 1006.401...

  20. 24 CFR 1006.401 - Monitoring of compliance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Monitoring and Accountability § 1006.401 Monitoring of compliance. (a) Periodic reviews and monitoring. At least annually, the DHHL must review the activities... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Monitoring of compliance. 1006.401...

Top