Sample records for nasa cercla program

  1. An Overview of In-Stu Treatability Studies at Marshall Space Flight Center, Huntsville, Alabama

    NASA Technical Reports Server (NTRS)

    McElroy, Bill; Keith, Amy; Glasgow, J. K.; Dasappa, Srini; McCaleb, Rebecca (Technical Monitor)

    2001-01-01

    Marshall Space Flight Center (MSFC) is located in Huntsville, Alabama (north-central Alabama), on approximately 1,840 acres near the center of the U.S. Army's Redstone Arsenal (RSA). MSFC is the National Aeronautics and Space Administration's (NASA's) principal propulsion development center. Its scientists, engineers, and support personnel play a major role in the National Space Transportation System by managing space shuttle mission activities, including the microgravity laboratory. In addition, MSFC will be a significant contributor to several of NASA's future programs, including the Reusable Launch Vehicle (X-33), International Space Station, and Advanced X-ray Astrophysics Facility, as well as research on a variety of space science applications. MSFC has been used to develop, test and manufacture space vehicles and components since 1960, when civilian rocketry and missile activities were transferred from RSA to MSFC. In 1994, MSFC was placed on the National Priority List for the management of hazardous waste sites, under the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). One requirement of the CERCLA program is to evaluate the nature and extent of environmental contamination resulting from identified CERCLA sites, assess the public health and environmental risks associated with the identified contamination, and identify potential remedial actions. A CERCLA remedial investigation (RI) for the groundwater system has identified at least five major plumes of chlorinated volatile organic compounds (CVOCs) in the groundwater beneath the facility. These plumes are believed to be the result of former management practices at 14 main facility locations (termed "source areas") where CVOCs were released to the subsurface. Trichloroethene (TCE) is the predominant CVOC and is common to all the plumes. Perchloroethene (PCE) also exists in two of the plumes. In addition to TCE and PCE, carbon tetrachloride and 1,1,2,2-tetrachloroethane are contained in one of the plumes. The CVOCs are believed to exist as dense non-aqueous phase liquids (DNAPLs) beneath many of the source areas.

  2. RCRA/UST, Superfund, and EPCRA hotline training module. Introduction to statutory overview of CERCLA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This module presents a brief overview of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), the statute through which Congress established EPA`s hazardous substance release reporting and cleanup program, known as the `Superfund` program. The statute provides the legal authority and general framework for the program, while specific procedural requirements can be found in the regulations and guidance documents. It is vital that Hotline Information Specialist be knowledgeable about the statute itself because it is the primary reference used to answer questions relating to the Superfund program. This module presents information on the CERCLA statute only, notmore » the regulations promulgated pursuant to the statute.« less

  3. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7103 The Comprehensive...

  4. COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY INFORMATION SYSTEM (CERCLIS)

    EPA Science Inventory

    The Superfund program was created as a result of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA was enacted on 12/11/80, and amended by the Superfund Amendments and Reauthorization Act of 1986. These acts established broad authority for...

  5. RCRA, Superfund and EPCRA hotline training module. Introduction to: Statutory overview of the Comprehensive Environmental Response, Compensation, and Liability Act (updated February 1998); Directive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    This module presents a brief overview of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the statute through which Congress established EPA`s hazardous substance release reporting and cleanup program, known as the Superfund program. This module presents information of the CERCLA statute only, not the regulations promulgated pursuant to the statute.

  6. On the brink of reform: Four bills vie for the Superfund reauthorization title

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zodrow, J.J.

    1995-12-01

    After months of hearings in the House of Representatives and the Senate, Congress is poised to reform the Comprehensive Environmental Response, Compensation and Liability Act of 1980. Without CERCLA reauthorization, no federal tax dollars will be allocated to the Superfund for remediating contaminated industrial sites. Authorization to pay into the Superfund expired officially in 1994, and only $2.8 billion remains in the trust fund, enough to run the program through next September at its current annual budget of $1.4 billion. Critics state that Congress acted ambitiously in enacting CERCLA 15 years ago in response to a general belief that onlymore » dozens of contaminated sites existed and could be addressed within a few years. However, the Environmental Protection Agency since 1980 has named 1,300 sites to the National Priorities List. Many contend that the Superfund program was not designed to be a clearinghouse for a multitude of site cleanups. CERCLA`s complicated procedural requirements and taxing transactional costs, some say, were intended to apply to a few, highly toxic sites.« less

  7. 40 CFR 355.33 - What release quantities of EHSs and CERCLA hazardous substances trigger the emergency release...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false What release quantities of EHSs and..., EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS EMERGENCY PLANNING AND NOTIFICATION Emergency Release Notification Who Must Comply § 355.33 What release quantities of EHSs and CERCLA hazardous...

  8. Installation Restoration Program. Phase 1 - Records Search, Robins AFB, Georgia.

    DTIC Science & Technology

    1982-04-01

    Installations U under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980. PURPOSE AND SCOPE OF THE... Liability Act of 1980 (CERCLA). A potentially hazardous waste is one which is suspected of being hazardous although insufficient data are available to...comprised of a concrete vault buried approximately six feet below the ground surface. 4 A locked chain -linked fence with two barbed wire strands surrounds

  9. CERCLIS Non-NPL Removal Sites in US EPA Region 3

    EPA Pesticide Factsheets

    This data layer contains point locations of waste sites throughout EPA Region 3 that have come under the jurisdiction of CERCLA. Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, also known as Superfund) in response to a growing national concern about the release of hazardous substances from abandoned waste sites. Under CERCLA, Congress gave the federal government broad authority to regulate hazardous substances, to respond to hazardous substance emergencies, and to develop long-term solutions for the Nation's most serious hazardous waste problems. The 1980 law requires the parties responsible for the contamination to conduct or pay for the cleanup. If the Environmental Protection Agency's (EPA's) efforts to take an enforcement action for the cleanup are not successful, the federal government can clean up a site using the CERCLA Trust Fund. If the Superfund program conducts the cleanup, the government can take court action against responsible parties to recover up to three times the cleanup costs. These sites do not meet the requirements for the National Priority List, but are still part of the CERCLA list. The National Priority List is intended primarily to guide the EPA in determining which sites warrant further investigation. Some of these waste sites are also known as removal sites, where waste and/or soils are transported away from the site. This point location data was extracted by US EPA Region 3 pe

  10. Remedying CERCLA`s natural resource damages provision: Incorporation of the public trust doctrine into natural resource damage actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chase, A.R.

    When Congress enacted the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), it ushered in a sweeping approach to controlling the environmental effects of improper hazardous waste disposal. CERCLA`s cleanup provisions, which focus on removal and remediation of hazardous substances from inactive hazardous waste sites, have progressed through more than a decade of litigation and a great deal of public debate. However, CERCLA`s natural resource damage provisions have not shared this same degree of progress.

  11. 2011 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation, Oak Ridge, Tennessee - Data and Evaluations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-03-01

    Under the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency, (EPA) and the Tennessee Department of Environment and Conservation (TDEC) in 1992, all environmental restoration activities on the ORR are performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Since the 1990s, the environmental restoration activities have experienced a gradual shift from characterization to remediation. As this has occurred, it has been determined that the assessment of the individual and cumulative performance of all ORR CERCLA remedial actionsmore » (RAs) is most effectively tracked in a single document. The Remediation Effectiveness Report (RER) is an FFA document intended to collate all ORR CERCLA decision requirements, compare pre- and post-remediation conditions at CERCLA sites, and present the results of any required post-decision remediation effectiveness monitoring. First issued in 1997, the RER has been reissued annually to update the performance histories of completed actions and to add descriptions of new CERCLA actions. Monitoring information used in the 2011 RER to assess remedy performance was collected and/or compiled by DOE's Water Resources Restoration Program (WRRP). Only data used to assess performance of completed actions are provided. In addition to collecting CERCLA performance assessment data, the WRRP also collects baseline data to be used to gauge the effectiveness of future actions once implemented. These baseline data are maintained in the Oak Ridge Environmental Information System and will be reported in future RERs, as necessary, once the respective actions are completed. However, when insufficient data exist to assess the impact of the RAs, e.g., when the RA was only recently completed, a preliminary evaluation is made of early indicators of effectiveness at the watershed scale, such as contaminant trends at surface water integration points (IFs). Long-term stewardship (LTS) information used in this report is collected, compiled, and tracked by the WRRP in conjunction with the Bechtel Jacobs Company LLC (BJC) Surveillance and Maintenance (S&M) program, the BJC Radiation Protection Organization at East Tennessee Technology Park (ETTP), ETTP Environmental Compliance Program, B&W Y-12 Liquid Waste Treatment Operations, and UT Battelle Facilities Management Division. Additionally, documentation verifying the implementation of administrative land use controls (LUCs) [i.e., property record restrictions, property record notices, zoning notices, and excavation/penetration permit (EPP) program] is also obtained from many sources throughout the fiscal year (FY), including County Register of Deeds offices for property record restrictions and property record notices, City Planning Commission for zoning notices, and BJC project engineers for EPP program verification. Copies of this documentation are obtained by the WRRP and maintained with the project RER files.« less

  12. Installation Restoration Program. Phase I. Records Search, Grand Forks Air Force Base, North Dakota.

    DTIC Science & Technology

    1985-04-01

    and Liability Act . (CERCLA) of 1980, Executive Order 12316, and 40 CFR 300 Subpart F O* (National Oil and Hazardous Substances Contigency Plan...response action on USAF installations under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as...COMBAT ICBT, OPSRA1ON$ MAINI’IPAIICE MAKGIMEIE WPPloTn GROP OIEGRO UP FIOSPITAL, 441 SM)tsU SUPLY 14O SIC 2 SP 447 SM S o u R M I3 1 1 5 E EE2 TENANT

  13. Guidance document publications list - Office of Environmental Policy and Assistance RCRA/CERCLA Division (EH-413)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    This document provides a listing of Guidance Documents from the RCRA/CERCLA Division for August 1995. Documents are listed under the following categories: RCRA Guidance Manuals; RCRA Information Briefs; CERCLA Guidance Manuals; CERCLA Regulatory Bulletins; RCRA/CERCLA Guidance Manuals; TSCA Guidance Manuals; TSCA Information Briefs; and, Cross Cut Manuals.

  14. 40 CFR 305.25 - Informal settlement; voluntary agreement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  15. 40 CFR 305.25 - Informal settlement; voluntary agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  16. 40 CFR 305.25 - Informal settlement; voluntary agreement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  17. 40 CFR 305.35 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  18. 40 CFR 305.35 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  19. 40 CFR 305.35 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  20. 40 CFR 35.421 - Maximum federal share.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Maximum federal share. 35.421 Section 35.421 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Environmental Program Grants State Response Program Grants (cercla Section...

  1. 40 CFR 35.421 - Maximum federal share.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Maximum federal share. 35.421 Section 35.421 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Environmental Program Grants State Response Program Grants (cercla Section...

  2. 40 CFR 35.421 - Maximum federal share.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Maximum federal share. 35.421 Section 35.421 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Environmental Program Grants State Response Program Grants (cercla Section...

  3. 40 CFR 35.421 - Maximum federal share.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Maximum federal share. 35.421 Section 35.421 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Environmental Program Grants State Response Program Grants (cercla Section...

  4. 40 CFR 35.421 - Maximum federal share.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Maximum federal share. 35.421 Section 35.421 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Environmental Program Grants State Response Program Grants (cercla Section...

  5. 40 CFR 305.21 - Amendment of request for a hearing; withdrawal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  6. 40 CFR 305.21 - Amendment of request for a hearing; withdrawal.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  7. 40 CFR 305.21 - Amendment of request for a hearing; withdrawal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  8. 40 CFR 35.419 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... enhance the response program of the State; capitalize a revolving loan fund for Brownfield remediation under section 104(k)(3) of CERCLA; or purchase insurance or develop a risk sharing pool, an indemnity pool, or insurance mechanism to provide financing for response actions under a State response program. ...

  9. Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’

    EPA Pesticide Factsheets

    Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’`

  10. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less

  11. 40 CFR Appendix B to Part 307 - Claim for CERCLA Response Action

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Claim for CERCLA Response Action B Appendix B to Part 307 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES Pt. 307, App. B Appendix B to Part 307—Claim for CERCLA...

  12. 40 CFR Appendix B to Part 307 - Claim for CERCLA Response Action

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Claim for CERCLA Response Action B Appendix B to Part 307 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES Pt. 307, App. B Appendix B to Part 307—Claim for CERCLA...

  13. Role of Background in the CERCLA Cleanup Program

    EPA Pesticide Factsheets

    This document clarifies the U.S. Environmental Protection Agency (EPA) preferred approach for the consideration of background constituent concentrations of hazardous substances, pollutants, and contaminants in certain steps of the remedy selection process

  14. 40 CFR 300.440 - Procedures for planning and implementing off-site response actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... under section 311 of the Clean Water Act where the release poses an immediate and significant threat to... to CERCLA wastes from cleanup actions based on CERCLA decision documents signed or consent decrees lodged after October 17, 1986 (“post-SARA CERCLA wastes”) as well as those based on CERCLA decision...

  15. 77 FR 69827 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    .... G. Demonstrating the Four Elements As part of the annual work plan negotiation process, states or... eligibility for funding, use of funding, grant mechanisms and process for awarding funding, the allocation... elements of an environmental response program and that the response program establishes and maintains a...

  16. Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing themore » extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.« less

  17. 76 FR 51029 - Proposed CERCLA Administrative Cost Recovery Settlement; Carpenter Avenue Mercury Site, Iron...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... Parties pursuant to Sections 113(f)(2) and 122(h)(4) of CERCLA, 42 U.S.C. 9613(f)(2) and 9622(h)(4). For... Parties that EPA has signed the CERCLA 122(h), 42 U.S.C. 9622(h) Settlement Agreement (Agreement) and the... ENVIRONMENTAL PROTECTION AGENCY [FRL-9452-4] Proposed CERCLA Administrative Cost Recovery...

  18. Clarification of CERCLA Entry Policy

    EPA Pesticide Factsheets

    This memorandum provides Regional Counsel with clarification on EPA’s Policy: “Entry and Continued Access Under CERCLA.” The Policy focuses on consensually gaining access for CERCLA activities at a particular location.

  19. 78 FR 73525 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    .... demonstrate that its response program includes, or is taking reasonable steps to include, the four elements of.... Achievement of the four elements should be viewed as a priority. Section 128(a) authorizes funding for... record requirement. The four elements of a response program are described below: 1. Timely survey and...

  20. RCRA, Superfund and EPCRA hotline training module. Introduction to: Superfund liability, enforcement, and settlements (updated February 1998); Directive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    The goal of this module is to describe the liability, enforcement, and settlement provisions of CERCLA; list the CERCLA enforcement mechanisms available to EPA; explain CERCLA sections 104 and 106 provisions; define potentially responsible party; explain CERCLA section 107 liability; cite and locate the relevant CERCLA documents on enforcement and liability; explain the differences between administrative and judicial enforcement and settlement procedures; list and compare the differences between enforcement authorities as they apply to removal and remedial actions; list the key enforcement steps in EPA`s response process; and specify noncompliance penalties and provide statutory citations.

  1. Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

    1993-06-01

    Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutionsmore » to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.« less

  2. RISK COMMUNICATION IN COMMUNITY PARTICIPATION: COMPARING REGIONAL PROGRAMS IN SOUTH FLORIDA

    EPA Science Inventory

    Comparison of the U.S. Environmental Protection Agency’s Superfund Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the U.S. Army Corps of Engineers’ Comprehensive Everglades Restoration Plan (CERP) decision-making regimes revealed...

  3. 40 CFR 303.10 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND... Liability Act (CERCLA), section 109(d). As authorized in the Superfund Amendments and Reauthorization Act of...

  4. 40 CFR 303.10 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND... Liability Act (CERCLA), section 109(d). As authorized in the Superfund Amendments and Reauthorization Act of...

  5. 40 CFR 303.10 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND... Liability Act (CERCLA), section 109(d). As authorized in the Superfund Amendments and Reauthorization Act of...

  6. 40 CFR 303.10 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND... Liability Act (CERCLA), section 109(d). As authorized in the Superfund Amendments and Reauthorization Act of...

  7. 40 CFR 303.10 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER SUPERFUND... Liability Act (CERCLA), section 109(d). As authorized in the Superfund Amendments and Reauthorization Act of...

  8. Enhanced Preliminary Assessment Fort Devens, Massachusetts

    DTIC Science & Technology

    1992-04-30

    remedial programs and RCRA corrective actions at Fort Devens . The areas regulated under RCRA will require closure when no longer in...under which the work in the MEP has been developed requires full integration of CERCLA remedial programs and RCRA corrective actions at Fort Devens ...AREEs 65 and 67, asbestos and radon, respectively. Fort Devens has ongoing programs that deal with these concerns. Any remedial action or disturbance

  9. RCRA, Superfund and EPCRA hotline training module. Introduction to: CERCLA and EPCRA release reporting requirements (CERCLA section 103 and EPCRA section 304)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    The release reporting requirements set out in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA) enable federal, state, and local authorities to effectively prepare for and respond to chemical accidents. This module reviews the regulations found at 40 CFR Part 302 promulgated pursuant to CERCLA section 103, and the regulations found at 40 CFR section 355.40 promulgated pursuant to EPCRA section 304. The goal of this module is to explain the notification requirements triggered by releases of CERCLA hazardous substances and EPCRA-designated extremely hazardous substances (EHSs).

  10. Recent trends at the state and federal level in accelerating CERCLA clean-ups

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clegg, B.

    Efforts at accelerating remedial action at the federal level focus on the following: the Superfund accelerated clean-up model (SCAM); Brownfields economic redevelopment initiative; guidance documents and policies; and collaboration with state voluntary cleanup programs. At the state level efforts involved in accelerating clean-ups include voluntary clean-up programs and Brownfields initiatives.

  11. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  12. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  13. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  14. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  15. GROUND WATER ISSUE: DESIGN GUIDELINES FOR CONVENTIONAL PUMP-AND-TREAT SySTEMS

    EPA Science Inventory

    Containment and cleanup of contaminated ground water are among the primary objectives of the CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act; also known as Superfund) and RCRA (Resource Conservation and Recovery Act) remediation programs. Ground-...

  16. 78 FR 40738 - Proposed CERCLA Administrative Cost Recovery Settlement; Double H Pesticide Burial Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ... are Double H, L.P.; James T. Hansen; Linda L. Hansen; George W. Higgins; and Edith M. Higgins. The... their original terms. Dated: June 27, 2013. Chris D. Field, Manager, Emergency Management Program, U.S...

  17. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  18. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  19. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  20. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  1. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  2. REGULATORY PROGRAMS. USEPA PERSPECTIVE ON THE REMEDIATION OF CONTAMINATED WOOD PRESERVING SITES.

    EPA Science Inventory

    Since the enactment of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA), as amended, many directives and initiatives have been established which govern various aspects of remedial activities at...

  3. 40 CFR 35.6230 - Application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Response Actions Core Program Cooperative Agreements § 35.6230 Application requirements. To receive a Core... number of products to be completed, and a schedule for implementation. Eligible activities under Core... to sustain and increase recipient involvement in CERCLA implementation, and the impact of Core...

  4. 40 CFR 35.6230 - Application requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Response Actions Core Program Cooperative Agreements § 35.6230 Application requirements. To receive a Core... number of products to be completed, and a schedule for implementation. Eligible activities under Core... to sustain and increase recipient involvement in CERCLA implementation, and the impact of Core...

  5. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false CERCLA delegations. 1.01-70 Section 1.01-70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL GENERAL PROVISIONS Delegation of Authority § 1.01-70 CERCLA delegations. (a) For the purpose of this...

  6. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false CERCLA delegations. 1.01-70 Section 1.01-70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL GENERAL PROVISIONS Delegation of Authority § 1.01-70 CERCLA delegations. (a) For the purpose of this...

  7. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Relationship to the CERCLA natural..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for...

  8. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Relationship to the CERCLA natural..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for...

  9. U.S. EPA Superfund Program's Policy for Risk and Dose Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Stuart

    2008-01-15

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) has primary responsibility for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on risk and dose assessment policies and tools for addressing radioactively contaminated sites by the Superfund program. EPA has almost completedmore » two risk assessment tools that are particularly relevant to decommissioning activities conducted under CERCLA authority. These are the: 1. Building Preliminary Remediation Goals for Radionuclides (BPRG) electronic calculator, and 2. Radionuclide Outdoor Surfaces Preliminary Remediation Goals (SPRG) electronic calculator. EPA developed the BPRG calculator to help standardize the evaluation and cleanup of radiologically contaminated buildings at which risk is being assessed for occupancy. BPRGs are radionuclide concentrations in dust, air and building materials that correspond to a specified level of human cancer risk. The intent of SPRG calculator is to address hard outside surfaces such as building slabs, outside building walls, sidewalks and roads. SPRGs are radionuclide concentrations in dust and hard outside surface materials. EPA is also developing the 'Radionuclide Ecological Benchmark' calculator. This calculator provides biota concentration guides (BCGs), also known as ecological screening benchmarks, for use in ecological risk assessments at CERCLA sites. This calculator is intended to develop ecological benchmarks as part of the EPA guidance 'Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments'. The calculator develops ecological benchmarks for ionizing radiation based on cell death only.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bashor, B.S.

    The major resources used by the Bureau of Environment, and Environmental Epidemiology (EEP) for risk assessment are: the Integrated Risk Information System (IRIS), Health and Environmental Effects Summary Table (HEAST), Agency for Toxic Substances and disease Registry (ATSDR) Toxicological Profiles, databases at the National Library of Medicine (NLM), World Health Organization (WHO) ENvironmental Criteria, and documents that the Environmental Protection Agency (EPA) has published on Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) risk assessment activities. The Risk Assessment Review has been helpful in providing information about availability of new documents or information. No systematic method has been made availablemore » to us to locate information resources. IRIS User`s Support has been helpful in making appropriate and timely referrals. Most other EPA resources were located by serendipity and persistence. The CERCLA methodology for risk assessments is being used in environmental programs, and at present, one person is responsible for all risk assessment activities in the department, but plans are underway to train one or two people from each program area. 2 figs.« less

  11. 75 FR 34117 - Proposed CERCLA Section 122(h) Cost Recovery Settlement for the H.M. Quackenbush, Inc. Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9162-9] Proposed CERCLA Section 122(h) Cost Recovery Settlement for the H.M. Quackenbush, Inc. Superfund Site, Herkimer, Herkimer County, NY AGENCY: Environmental...''), Region II, of a proposed cost recovery settlement agreement pursuant to Section 122(h) of CERCLA, 42 U.S...

  12. 40 CFR 373.4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COMMUNITY RIGHT-TO-KNOW PROGRAMS REPORTING HAZARDOUS SUBSTANCE ACTIVITY WHEN SELLING OR TRANSFERRING FEDERAL... definitions apply: (a) Hazardous substances means that group of substances defined as hazardous under CERCLA 101(14), and that appear at 40 CFR 302.4. (b) Storage means the holding of hazardous substances for a...

  13. 40 CFR 35.736 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establish or enhance the response program of the Tribe; capitalize a revolving loan fund for brownfield remediation under section 104(k)(3) of CERCLA; or purchase insurance or develop a risk sharing pool, an indemnity pool, or insurance mechanism to provide financing for response actions under a Tribal response...

  14. 40 CFR 35.735 - Maximum federal share.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... percent of the approved work plan costs. Tribal Response Program Grants (CERCLA Section 128(A)) Source: 74... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Maximum federal share. 35.735 Section 35.735 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE...

  15. 40 CFR 35.735 - Maximum federal share.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... percent of the approved work plan costs. Tribal Response Program Grants (CERCLA Section 128(A)) Source: 74... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Maximum federal share. 35.735 Section 35.735 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE...

  16. 40 CFR 35.735 - Maximum federal share.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... percent of the approved work plan costs. Tribal Response Program Grants (CERCLA Section 128(A)) Source: 74... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Maximum federal share. 35.735 Section 35.735 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE...

  17. 40 CFR 35.735 - Maximum federal share.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... percent of the approved work plan costs. Tribal Response Program Grants (CERCLA Section 128(A)) Source: 74... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Maximum federal share. 35.735 Section 35.735 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE...

  18. 40 CFR 35.735 - Maximum federal share.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... percent of the approved work plan costs. Tribal Response Program Grants (CERCLA Section 128(A)) Source: 74... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Maximum federal share. 35.735 Section 35.735 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE...

  19. 75 FR 69992 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... can be located at http://www.epa.gov/brownfields . FOR FURTHER INFORMATION CONTACT: The U.S. EPA's Office of Solid Waste and Emergency Response, Office of Brownfields and Land Revitalization, (202) 566..., these response programs address the assessment, cleanup, and redevelopment of brownfields sites and...

  20. 76 FR 66063 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... Activities; Submission to OMB for Review and Approval; Comment Request; Application for Reimbursement to...: Application for Reimbursement to Local Governments for Emergency Response to Hazardous Substance Releases... for reimbursement under this program authorized under Section 123 of CERCLA to submit an application...

  1. SUBSURFACE CHARACTERIZATION AND MONITORING TECHNIQUES: A DESK REFERENCE GUIDE - VOLUME I: SOLIDS AND GROUND WATER - APPENDICES A AND B

    EPA Science Inventory

    Many EPA programs, including those under the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Response, Compensation, and Liability Act (CERCLA), require subsurface characterization and monitoring to detect ground-water contamination and provide data to devel...

  2. Environmental guidance for public participation in environmental restoration activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-11-01

    The US Department of Energy (DOE) is issuing this document, entitled Guidance on Public Participation for US Department of Energy Environmental Restoration Activities, to summarize policy and provide guidance for public participation in environmental restoration activities at DOE Headquarters, Field Offices, facilities, and laboratories. While the Office of Environmental Restoration and Waste Management (EM) has environmental restoration responsibility for the majority of DOE sites and facilities, other DOE Project Offices have similar responsibilities at their sites and facilities. This guidance is applicable to all environment restoration activities conducted by or for DOE under the Comprehensive Environmental Response, Compensation, and Liabilitymore » Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA); the Resource Conservation and Recovery Act of 1976 (RCRA) as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA) (corrective actions only); and the National Environmental Policy Act of 1969 (NEPA). This guidance also is applicable to CERCLA remedial action programs under the Uranium Mill Tailings Radiation Control Act of 1978 and the Formerly Utilized Sites Remedial Action Program, where DOE is the designated lead. The primary objectives of this guidance document are as follows: acclimate DOE staff to a changing culture that emphasizes the importance of public participation activities; provide direction on implementing these public participation activities; and, provide consistent guidance for all DOE Field Offices and facilities. The purpose of this document is to provide guidance on conducting effective public participation activities for environmental restoration activities under CERCLA; RCRA corrective actions under sections 3004(u), 3004(v), and 3008(h); and NEPA public participation activities.« less

  3. Negotiation of a triparty agreement for mixed waste at Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGuire, H.E.; Powers, L.L.; Waite, J.L.

    The US Department of Energy (DOE) is currently pursuing the activities necessary to obtain a final operating permit under the Resource Conservation and Recovery Act (RCRA) at Hanford. In addition, the Environmental Restoration Program has been established to conduct inactive site investigations and remedial actions as required under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The anticipated cost for the inactive site cleanup is significant. This was highlighted in a DOE report, where the expected cost for Hanford cleanup is shown as approximately $27 billion. It is imperative that the RCRA closure and corrective action activities be properlymore » integrated with the CERCLA actions to ensure site cleanup is performed in a consistent and cost-effective manner. It is believed that such an objective would best be served through an integrated triparty agreement between the Washington State Department of Ecology (WSDE), the US Environmental Protection Agency (EPA), and the DOE. The WSDE wants clear enforceability in any agreement and believes such enforceability can only be obtained through a judicial consent decree. A consent decree with WSDE for RCRA compliance would have to be separate from a CERCLA Sec. 120 federal facility agreement since EPA cannot enter into a consent decree with another federal agency.« less

  4. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provide the following information, where available: (1) The name and location of the facility to which the CERCLA waste is to be shipped; (2) The type and quantity of CERCLA waste to be shipped; (3) The expected... facility is located of major changes in the shipment plan, such as a decision to ship the CERCLA waste to...

  5. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... provide the following information, where available: (1) The name and location of the facility to which the CERCLA waste is to be shipped; (2) The type and quantity of CERCLA waste to be shipped; (3) The expected... facility is located of major changes in the shipment plan, such as a decision to ship the CERCLA waste to...

  6. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provide the following information, where available: (1) The name and location of the facility to which the CERCLA waste is to be shipped; (2) The type and quantity of CERCLA waste to be shipped; (3) The expected... facility is located of major changes in the shipment plan, such as a decision to ship the CERCLA waste to...

  7. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-of-an-Indian-Tribal-area-of-Indian-country transfer of CERCLA waste. 35.6120 Section 35.6120...-of-Indian-country transfer of CERCLA waste. (a) The recipient must provide written notification of off-site shipments of CERCLA waste from a site to an out-of-State or out-of-an-Indian-Tribal-area-of...

  8. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-of-an-Indian-Tribal-area-of-Indian-country transfer of CERCLA waste. 35.6120 Section 35.6120...-of-Indian-country transfer of CERCLA waste. (a) The recipient must provide written notification of off-site shipments of CERCLA waste from a site to an out-of-State or out-of-an-Indian-Tribal-area-of...

  9. 78 FR 44119 - Circle Environmental #1 Superfund Site; Dawson, Terrell County, Georgia; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9837-3; CERCLA-04-2013-3760] Circle Environmental 1 Superfund... settlement with Walter G. Mercer, Jr. concerning the Circle Environmental 1 Superfund Site located in Dawson... methods: Internet: www.epa.gov/region4/superfund/programs/enforcement/enforcement.html U.S. Mail: U.S...

  10. 78 FR 70551 - Macalloy Superfund Site, North Charleston, Charleston County, South Carolina; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... ENVIRONMENTAL PROTECTION AGENCY [CERCLA-04-2014-3750; FRL 9903-42-Region 4] Macalloy Superfund...., addressing past costs and a portion of future costs concerning the Macalloy Superfund Site located in North... following methods: Internet: www.epa.gov/region4/superfund/programs/enforcement/enforcement.html . U.S. Mail...

  11. SUBSURFACE CHARACTERIZATION AND MONITORING TECHNIQUES: A DESK REFERENCE GUIDE - VOLUME II: THE VADOSE ZONE, FIELD SCREENING AND ANALYTICAL METHODS - APPENDICES C AND D

    EPA Science Inventory

    Many EPA programs, including those under the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Response, Compensation, and Liability Act (CERCLA), require subsurface characterization and monitoring to detect ground-water contamination and provide data to deve...

  12. No Further Action Decision Under CERCLA Study 43R Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    in accordance with the same. E Date RAC Environmental Coordinator m U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRý% Date Fort Devens Remedial...CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS I * Prepared for: U.S. Army Environmental Center

  13. Problems and limitations of voluntary cleanup programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, S.F.

    1995-12-31

    At least a dozen states have already implemented voluntary cleanup programs (VCPs). Provisions to promote state VCPs were prominent in the EPA`s 1994 proposed revisions to CERCLA and in current legislative initiatives. Under the VCP, property owners voluntarily enroll to investigate and remediate contaminated sites with the aegis of a state agency and thus avoid involvement with the federal Superfund program. When the state agency is satisfied with the condition of the site, it issues a certificate to the owner. The VCP is meant to mitigate unintended consequences of CERCLA such as the economic abandonment of urban industrial sites inmore » favor of unpolluted suburban sites. The VCP concept has been combined with other reforms including cleanup standards, financial incentives, and independent action. The effectiveness of voluntary cleanup programs is limited by the costs of investigation and cleanup relative to the value of the property in question. It is also limited when property has environmental problems outside the traditional focus of state Superfund agencies on soil and groundwater contamination. VCPs also have potential unintended consequences of their own. The VCP concept is consistent with a 15 year trend of increasing government attention and involvement with sites of diminishing health and environmental significance. VCP may reinforce the perception of liability and unwittingly raise the standard of due diligence in property assessments, especially if combined with generic cleanup standard.« less

  14. No Further Action Decision Under CERCLA, Study Area 14, Landfill No. 10, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    I I I U.S. ArmyEnvironmentalCenter NO FURTHER ACTION DECISION UNDER 5 CERCLA * STUDY AREA 14 LANDFILL NO. 10 U FORT DEVENS , MASSACHUSETTS CONTRACT...45, 1 Feb 93 replaces THAMA Form 45 which is obsolete. U 1I NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 14 LANDFILL NO. 10 3 FORT DEVENS ... FORT DEVENS , MASSACHUSETTS 3 TABLE OF CONTENTS Section Title Page No. EXECUTIVE SUMMARY ......................................... ES-1 I 1.0

  15. No Further Action Decision Under CERCLA Study Area 43Q Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    the same. ,J ES C. CHAMBERS Date RAC Environmental Coordinator I U.S. ENVIRONMENTAL PROTECTION AGENCY -t JAMES P. BYR4 Date3 Fort Devens Refiedial...CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS , CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES 5 FORT DEVENS , MASSACHUSETTS V a I i Prepared for: U.S. Army Environmental Center

  16. No Further Action Decision Under CERCLA Study Area 43L Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BY/NE ) Date Fort Devens Remedial Project Manager...CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...DECISION UNDER CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES ! FORT DEVENS , MASSACHUSETTS I I I 5 Prepared for: U.S. Army Environmental Center I

  17. Land Use in the CERCLA Remedy Selection Process

    EPA Pesticide Factsheets

    This directive presents additional information for considering land use in making remedy selection decisions under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at National Priorities List (NPL) sites.

  18. Memorandum of the Establishment of Cleanup Levels for CERCLA Sites with Radioactive Contamination

    EPA Pesticide Factsheets

    This memorandum presents clarifying guidance for establishing protective cleanup levels for radioactive contamination at Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites.

  19. The Pueblo Superfund program -- a Native American perspective on cultural impacts and environmental equity under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanchez, C.M.; Garcia, T.L.; Chavez, E.F.

    1996-12-31

    The All Indian Pueblo Council (AIPC) through the Pueblo Office of Environmental Protection (POEP) implements and provides a variety of environmental programs and services to the 19 Indian Pueblos of New Mexico. Specifically, the POEP Superfund Program investigates and evaluates potential hazardous waste sites within Pueblo lands. The POEP Superfund Program began in September 1991 when the 19 Pueblo Governors signed a Superfund Memorandum of Agreement with the US Environmental Protection Agency (EPA) Region 6. The goal of the POEP Superfund Program is to determine those sites that are eligible for Superfund-financed remedial action by placing those sites on themore » National Priorities List (NPL), while including the Pueblo perspective. Because the 19 Pueblos are each unique, sovereign nations, several differences and gaps associated with the current Superfund law and EPA methodologies exist. Currently, the Superfund Hazard Ranking System (HRS) model does not account for Indian religious and ceremonial impacts from these sites. Due to their importance in Pueblo life, culturally significant plants, animals, ceremonial surface water use, and sacred areas should be considered as critical impacts when evaluating the various pathways of exposure of the HRS. Tribal environmental equality is an aspect that will be included into all environmental laws. AIPC and POEP are working to address this issue under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA).« less

  20. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Federal Facilities

    EPA Pesticide Factsheets

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund, authorizes the President to respond to releases or threatened releases of hazardous substances into the environment.

  1. 76 FR 55061 - Two Proposed CERCLA Administrative Settlement Agreements for Long-Term Access at the Bountiful...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ..., Utah. The proposed Settlement Agreements are with Davis County and Security Investment Ltd... CERCLA civil liability at their respective properties will be resolved. The Settlement Agreements include...

  2. Superfund: CERCLA Overview

    EPA Pesticide Factsheets

    CERCLA, commonly known as Superfund, was enacted by Congress on December 11, 1980. This law created a tax on the chemical and petroleum industries and provided broad Federal authority to respond directly to releases or threatened releases of hazardous subs

  3. Final report on the waste area grouping perimeter groundwater quality monitoring well installation program at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greene, J.A.

    1991-06-01

    A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included.

  4. No Further Action Decision Under CERCLA Study Area 43E Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AREA 43E * HISTORIC GAS STATION SITES g FORT DEVENS , MASSACHUSETTS £ I CONTRACT DAAA15-91-D-0008I U.S. ARMY ENVIRONMENTAL CENTER3 ABERDEEN PROVING...FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES I FORT DEVENS , MASSACHUSETTS i I 1 Prepared for: U.S. Army...7053-12 JANUARY 1995 I I. NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS

  5. Transmittal of guidance on use and enforcement of CERCLA information requests and administrative subpoenas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-08-25

    The directive provides an overview of the information gathering tools under CERCLA section 104(e) and 122(e)(3), and focuses on the steps to be taken throughout the information gathering process to ensure that EPA is in the strongest position possible to enforce the information gathering or subpoena. The guidance replaces existing guidance entitled, Policy on Enforcing Information Requests in Hazardous Waste Cases, dated September 10, 1984, to the extent that the previous guidance addresses information gathering under CERCLA section 104(e), directive no. 9834.4.

  6. [Redacted] Settlement Agreement - Docket No. CERCLA-04-2009-3978 (Appendix A Withheld)

    EPA Pesticide Factsheets

    Contains legal agreement for the Granville High School Mercury Superfund site under CERCLA Section 122(h)(1), Creedmoor, Granville County, North Carolina, November 13, 2009 DocID: 10760173 , DocDate: 11-13-2009

  7. Removal Cost Policy and Operating Procedures (CERCLA)

    DOT National Transportation Integrated Search

    1996-05-24

    CG OSCs, operating under the National Contingency Plan, 40 CFR 300, Subpart E - : Hazardous Substance Response, have access to SUPERFUND/CERCLA Fund on a : reimbursable basis when responding to a hazardous substance incident. EPA annually provides to...

  8. SITE TECHNOLOGY CAPSULE: TEXACO GASIFICATION PROCESS

    EPA Science Inventory

    In 1980, the U.S. Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund. to protect human health and the environment from uncontrolled hazardous waste sites. CERCLA was amended by the Superfund Amendments and R...

  9. Impacts of CERCLA Release Notification Requirements on Transportation of Products Containing Hazardous Substances

    DOT National Transportation Integrated Search

    1986-08-01

    In order to determine the regulatory burden imposed by CERCLA release-notification requirements on shippers and carriers handling products containing hazardous substances, eight shippers and seven carriers were interviewed in depth during the summer ...

  10. 76 FR 14659 - Proposed CERCLA Administrative “Cost Recovery” Settlement; The Goldfield Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ..., Kansas City, KS 66101. A copy of the proposed settlement may be obtained from Kathy Robinson, Regional..., Missouri, and EPA Docket No. CERCLA-07-2011-0002, and should be addressed to Kathy Robinson, Regional...

  11. STABILIZATION/SOLIDIFICATION OF CERCLA AND RCRA WASTES

    EPA Science Inventory

    This Handbook provides U.S. EPA regional staff responsible for reviewing CERCLA remedial action plans and RCRA permit applications with a tool for interpreting information on stabilization/solidification treatment. As a practical day-to-day reference guide, it will also provide t...

  12. 76 FR 26291 - Proposed CERCLA Administrative “Cost Recovery” Settlement; the Doe Run Resources Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ..., Kansas City, KS 66101. A copy of the proposed settlement may be obtained from Kathy Robinson, Regional... County, Missouri, and EPA Docket No. CERCLA-07-2011-0003, and should be addressed to Kathy Robinson...

  13. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carey, Pat; Walker, Stuart

    2008-01-15

    This paper describes the Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities. The Environmental Protection Agency (EPA) implements the Superfund program under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA). From the beginning of the Superfund program, Congress envisioned a role for communities. This role has evolved and expanded during the implementation of the Superfund program. Initially, the CERCLA statute had community involvement requirementsmore » designed to inform surrounding communities of the work being done at a site. CERCLA's provisions required 1) development of a community relations plan for each site, 2) establishment of information repositories near each site where all publicly available materials related to the site would be accessible for public inspection, 3) opportunities for the public to comment on the proposed remedy for each site and 4) development of a responsiveness summary responding to all significant comments received on the proposed remedy. In recognition of the need for people living near Superfund sites to be well-informed and involved with decisions concerning sites in their communities, SARA expanded Superfund's community involvement activities in 1986. SARA provided the authority to award Technical Assistance Grants (TAGs) to local communities enabling them to hire independent technical advisors to assist them in understanding technical issues and data about the site. The Superfund Community Involvement Program has sought to effectively implement the statutory community involvement requirements, and to go beyond those requirements to find meaningful ways to involve citizens in the cleanup of sites in their communities. We've structured our program around two main themes, building capacity in staff, and building capacity in Communities. In summary, the Superfund program devotes substantial resources to involving the local community in the site cleanup decision making process. We believe community involvement provides us with highly valuable information that must be available to carefully consider remedial alternatives at a site. We also find our employees enjoy their jobs more. Rather than fighting with an angry public they can work collaboratively to solve the problems created by the hazardous waste sites. We have learned the time and resources we devote at the beginning of a project to developing relationships with the local community, and learning about their issues and concerns is time and resources well spent. We believe the evidence shows this up-front investment helps us make better cleanup decisions, and avoids last minute efforts to work with a hostile community who feels left out of the decision-making process.« less

  14. 40 CFR 300.3 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waters of the exclusive economic zone, or that may affect natural resources belonging to, appertaining to... governments in the initiation, development, selection, and implementation of response actions, pursuant to CERCLA. (6) Listing of federal trustees for natural resources for purposes of CERCLA and the CWA. (7...

  15. Health and Environmental Effects Profile for benzotrichloride

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-07-01

    The Health and Environmental Effects Profile for benzotrichloride was prepared to support listings of hazardous constituents of a wide range of waste streams under Section 3001 of the Resource Conservation and Recovery Act (RCRA) and to provide health-related limits for emergency actions under Section 101 of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Both published literature and information obtained from Agency program office files were evaluated as they pertained to potential human health, aquatic life and environmental effects of hazardous waste constituents. Quantitative estimates are presented provided sufficient data are available. Benzotrichloride has been evaluated as a carcinogen.more » The human carcinogen potency factor for benzotrichloride is 12.63 (mg/kg/day) for oral exposure. The Reportable Quantity (RQ) value of 1, 10, 100, 1000 or 5000 pounds is used to determine the quantity of a hazardous substance for which notification is required in the event of a release as specified by CERCLA based on chronic toxicity. The RQ value for benzotrichloride is 10.« less

  16. CERCLA and EPCRA Reporting Requirements for Air Releases of Hazardous Substances from Animal Waste at Farms

    EPA Pesticide Factsheets

    Provides an update on a CERCLA/EPCRA final rule that exempted all farms from reporting air releases of hazardous substances from animal waste. Following a court decision, farms must begin reporting these releases to November 15, 2017.

  17. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for assessing natural resource damages resulting from hazardous substance releases under the Comprehensive...

  18. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for assessing natural resource damages resulting from hazardous substance releases under the Comprehensive...

  19. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for assessing natural resource damages resulting from hazardous substance releases under the Comprehensive...

  20. Financial Responsibility Calculator to Accompany Proposed Requirements Under CERCLA Section 108(b) For Classes of Facilities in the Hardrock Mining Industry

    EPA Pesticide Factsheets

    This calculator will help stakeholders (owners and operators) of hardrock mines or mineral processing facilities calculate the amount of financial responsibility they should obtain under the proposed CERCLA 108b requirements

  1. Consolidated List of Lists under EPCRA/CERCLA/CAA §112(r) (March 2015 Version)

    EPA Pesticide Factsheets

    List of Lists was prepared to help firms handling chemicals determine, for a specific chemical, whether they may be subject to the following reporting requirements under Emergency Planning and Community Right-to-Know, CERCLA, and Clean Air Act.

  2. Overview, Analysis and Research Results of a CERCLA Site: A Model Study? and the NAFT Experience

    NASA Technical Reports Server (NTRS)

    Hunt, Clinton, Jr.

    2004-01-01

    THe paper discusses the following: What do we want to accomplish? How do we want to accomplish it? When do we expect to complete each task? CERCLA stands for: Comprehensive, Environmental, Response, Compensation, Liability, and Act.

  3. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO... a settlement under section 122(b)(1) of CERCLA, the Fund shall be available for the costs of any new...

  4. Administrative Settlement Agreement and Order on Consent for Removal Action - CERCLA Docket No. 04-2010-3756

    EPA Pesticide Factsheets

    Contains legal agreement for the Huntsville Gas Company site under CERCLA Sections 104, 106(a), 107, and 122, Huntsville, Madison County, Alabama, November 24, 2009 Region ID: 04 DocID: 10685283, DocDate: 11-24-2009

  5. Guidance on EPA Concurrence in the Identification of Uncontaminated Parcels under CERCLA Section 120 (h)(4)

    EPA Pesticide Factsheets

    This memorandum addresses the approach EPA should use in determining whether to concur that a parcel has been properly identified by a military service as 'uncontaminated' and therefore transferrable pursuant to CERCLA Section 120 (h)(4).

  6. 76 FR 32360 - Casmalia Disposal Site; Notice of Proposed CERCLA Administrative De Minimis Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9314-3] Casmalia Disposal Site; Notice of Proposed CERCLA Administrative De Minimis Settlement AGENCY: Environmental Protection Agency (EPA). ACTION: Notice; correction. SUMMARY: On April 4, 2011, a published notice of a proposed administrative de minimis settlement...

  7. Administrative Settlement Agreement and Order on Consent for Removal Action, CERCLA Docket No. 04-2009-3979, Forshaw Chemicals, Inc.

    EPA Pesticide Factsheets

    Contains legal agreement for the Forshaw Chemicals site under CERCLA Sections 104, 106(a), 107 and 122, Charlotte, Mecklenburg County, North Carolina, August 11, 2009 Region ID: 04 DocID: 10539125, DocDate: 08-11-2009

  8. Institutional Controls and Transfer of Real Property under CERCLA Section 120(h)(3)(A), (B) or (C)

    EPA Pesticide Factsheets

    This document provides guidance to the EPA on the exercise of EPA's discretion under CERCLA section 120(h)(3)(A),(B), or (C) when EPA is called upon to evaluate institutional controls as part of a remedial action.

  9. Administrative Settlement Agreement and Order on Consent for Remedial Investigation/Feasibility Study - Holtra Chem/Honeywell Inc. Superfund Site. CERCLA-04-2009-3980

    EPA Pesticide Factsheets

    Contains legal agreement for the LCP-Holtrachem Superfund site under CERCLA Sections 104, 107, and 122, Riegelwood, Columbus County, North Carolina , September 15, 2009 Region ID: 04 DocID: 10453068, DocDate: 09-15-2009

  10. 75 FR 4071 - Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... (``CERCLA''), notice is hereby given that a proposed administrative cost recovery settlement concerning the T.H. Agriculture and Nutrition LLC former Superfund Site (THAN Site) in Fresno, California was... 107 of CERCLA against the following Respondents: T.H. Agriculture & Nutrition, LLC, Syngenta Crop...

  11. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... health or welfare or the environment because of an actual or threatened release of a hazardous substance... steps as may be necessary to reduce exposure that presents a significant risk to human health, and to eliminate or substantially mitigate that significant risk to human health. (3) Authority, pursuant to CERCLA...

  12. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... health or welfare or the environment because of an actual or threatened release of a hazardous substance... steps as may be necessary to reduce exposure that presents a significant risk to human health, and to eliminate or substantially mitigate that significant risk to human health. (3) Authority, pursuant to CERCLA...

  13. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... health or welfare or the environment because of an actual or threatened release of a hazardous substance... steps as may be necessary to reduce exposure that presents a significant risk to human health, and to eliminate or substantially mitigate that significant risk to human health. (3) Authority, pursuant to CERCLA...

  14. 75 FR 35456 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... and Liability Act (CERCLA) or Superfund, Brownfields Amendments, Section 104(k); Notice of Revisions to FY2011 Guidelines for Brownfields Assessment, Revolving Loan Fund, and Cleanup Grants AGENCY... applicants in preparing proposals for grants to assess and clean up brownfield sites. EPA's Brownfields...

  15. Guidance: Policy for Municipality and MSW CERCLA Settlements at NPL Co-Disposal Sites

    EPA Pesticide Factsheets

    Transmittal memorandum and policy supplementing the 9/30/89 Interim Policy on CERCLA Settlements Involving Municipalities and Municipal Wastes. 1998 MSW Policy states that EPA will continue its policy of generally not identifying generators and transporters of MSW as PRPs at NPL sites.

  16. 75 FR 57272 - Proposed CERCLA Administrative Cost Recovery Settlement; Gilberts/Kedzie Site, Village of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9203-6] Proposed CERCLA Administrative Cost Recovery... hereby given of a proposed administrative settlement for recovery of past response costs concerning the... requires the settling parties to pay $3,000.00 to the Hazardous Substance Superfund and additional payments...

  17. 76 FR 6780 - Agency Information Collection Activities OMB Responses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Action Plan/Activity Integration Plan (CAP/AIP) Reporting System; was approved on 01/06/2011; OMB Number... without change. EPA ICR Number 1445.09; Continuous Release Reporting Regulations (CRRR) under CERCLA; 40... change. EPA ICR Number 1445.10; Continuous Release Reporting Regulations (CRRR) under CERCLA; 40 CFR 302...

  18. Settlement Agreement for Recovery of Past Response Costs at the Georgia-Pacific Hardwood Site, Plymouth, Washington County, North Carolina - Docket Number CERCLA-04-2008-3774

    EPA Pesticide Factsheets

    Contains legal agreement for the Georgia-Pacific Hardwood site under CERCLA Section 122(h)(1), Plymouth, Washington County, North Carolina, September 5, 2008 Region ID: 04 DocID: 10452729, DocDate: 09-05-2008

  19. SITE TECHNOLOGY CAPSULE: METAL-ENHANCED DECHLORI- NATION OF VOLATILE ORGANIC COMPOUNDS USING AN ABOVE-GROUND REACTOR - ENVIROMETAL TECHNOLOGIES, INC.

    EPA Science Inventory

    In 1980 the U.S. Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund, to protect human health and the environment from uncontrolled hazardous waste sites. CERCLA was amended by the Superfund Amendments an...

  20. 77 FR 51534 - Notice of Proposed Prospective Purchaser Agreement Pursuant to the Comprehensive Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... (``CERCLA''), and the Solid Waste Disposal Act AGENCY: Environmental Protection Agency (EPA). ACTION: Notice..., Compensation, and Liability Act of 1980, as amended (``CERCLA''), and the Solid Waste Disposal Act, commonly... solid waste management units (``SWMUs'') and evaluate remedy options. Both permits have been extended by...

  1. 78 FR 76143 - Proposed CERCLA Settlement Relating to the Paul's Tank Cleaning Service Superfund Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ... Paul's Tank Cleaning Service Superfund Site, Burlington County, New Jersey AGENCY: Environmental.... (``Settling Party''). The Settling Party is a potentially responsible party, pursuant to Section 107(a) of CERCLA, and thus is potentially liable for response costs incurred at or in connection Paul's Tank...

  2. Glossary of CERCLA-related terms and acronyms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-10-01

    This glossary contains CERCLA-related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended, related federal rulemakings (e.g., 40 CFR 300, National Oil and Hazardous Substances Pollution Contingency Plan), assorted guidance documents prepared by the US Environmental Protection Agency (EPA), and DOE Order 5400.4. The source of each term is noted after the term. Terms presented in this document reflect revised and new definitionsmore » published before June 1, 1991. 20 refs.« less

  3. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  4. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  5. 75 FR 8346 - Proposed CERCLA Administrative Settlement; Anderson-Calhoun Mine and Mill Site, Leadpoint, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ...-Calhoun Mine and Mill Site, Leadpoint, WA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice...-Calhoun Mine and Mill Site in Leadpoint, Washington, with settling party Blue Tee Corporation. The... Anderson-Calhoun Mine and Mill Site in Leadpoint, Washington, EPA Docket No. CERCLA-10-2010-0105 and should...

  6. Los requisitos de reportes para emisiones al aire de sustancias peligrosas provenientes de desechos animales agrícolas conforme a CERCLA y EPCRA

    EPA Pesticide Factsheets

    Debido a cambios legislativos en la Ley de Apropiaciones Consolidadas, 2018 (Ley Ómnibus), las “emisiones al aire provenientes de desechos animales en una granja” están exentas y no se requiere reportarlas conforme a CERCLA.

  7. 78 FR 79319 - Amendment to Standards and Practices for All Appropriate Inquiries Under CERCLA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... specific aspects of this rule, contact Patricia Overmeyer, Office of Brownfields and Land Revitalization... with a brownfields grant awarded under CERCLA section 104(k)(2)(B)(ii) may be affected by today's action. This includes state, local and tribal governments that receive brownfields site assessment grants...

  8. 76 FR 73622 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... of Possible Funding Reductions Please describe the effects, if any, of a 10% and 20% reduction in... and Liability Act (CERCLA) or Superfund, Section 128(a); Notice of Grant Funding Guidance for State... provides guidance on eligibility for funding, use of funding, grant mechanisms and process for awarding...

  9. 76 FR 69733 - Proposed CERCLA Administrative Cost Recovery Settlement; Tracy Lead Battery Site, Tracy, MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... Lead Battery Site in Tracy, Minnesota with the following settling parties: Day Side Recycling... Settlement; Tracy Lead Battery Site, Tracy, MN AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... Tracy Lead Battery Site and EPA Docket No. CERCLA-05-2012-0001 and should be addressed to Steven P...

  10. 40 CFR 35.6340 - Disposal of CERCLA-funded property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... has stopped supporting the project. (b) Supplies. (1) If supplies have an aggregate fair market value.... (2) If the supplies remaining at the end of the project period have an aggregate fair market value of... actions at the direction of EPA: (i) Use the supplies on another CERCLA project and reimburse the original...

  11. ICD Complex Operations and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  12. 75 FR 51482 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Notice is hereby given that on August 11, 2010, a... Comprehensive Environmental Response, Compensation, and Liability Act (``CERCLA''), 42 U.S.C. Sec. Sec. 9607(a...

  13. Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federalmore » rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.« less

  14. Transmittal of EPA Guidance on the Transfer of Federal Property by Deed Before All Necessary Remedial Action Has Been Taken Pursuant to CERCLA Section 120(h)(3)

    EPA Pesticide Factsheets

    This guidance is for the EPA Regions to use when reviewing requests from federal departments and agencies that are transferring property to defer the CERCLA Section 120(h)(3) covenant that all necessary remedial actions have been taken.

  15. Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action

    DTIC Science & Technology

    1991-09-30

    4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action 6. AUTHOR(S) Sam Capps Rupe, Major -1...Interim Status for TSD Facilities .................... 19 5 . Closure and Postclosure Requirements for TSD Facilities ........... 25 D. State Role... 65 1. RCRA Facility Assessment . ............................... 65 2. RCRA Facility Investigation . .............................. 66 3

  16. The Nexus Between Ecological Risk Assessment and Natural Resources Damage Assessment Under CERCLA: Introduction to a Society of Environmental Toxicology and Chemistry Techincal Workshop

    EPA Science Inventory

    A SETAC Technical Workshop titled “The Nexus Between Ecological Risk Assessment and Natural Resource Damage Assessment Under CERCLA: Understanding and Improving the Common Scientific Underpinnings,” was held 18–22 August 2008 in Gregson, Montana, USA, to examine the linkage, nexu...

  17. 43 CFR 11.15 - What damages may a trustee recover?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 11.15 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE... section 107(f) or 126(d) of CERCLA, or sections 311(f) (4) and (5) of the CWA, a natural resource trustee..., for the same discharge or release and natural resource, as set forth in section 107(f)(1) of CERCLA...

  18. 43 CFR 11.15 - What damages may a trustee recover?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 11.15 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE... section 107(f) or 126(d) of CERCLA, or sections 311(f) (4) and (5) of the CWA, a natural resource trustee..., for the same discharge or release and natural resource, as set forth in section 107(f)(1) of CERCLA...

  19. 77 FR 66462 - Proposed CERCLA Settlement Relating to the Digital Equipment Corp. Site a/k/a the PCB Horizon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9748-6] Proposed CERCLA Settlement Relating to the Digital Equipment Corp. Site a/k/a the PCB Horizon Site in San German, PR AGENCY: Environmental Protection Agency... Digital Equipment Corp. Superfund Site, a/k/a the PCB Horizon Site (``Site''), located in San German...

  20. 76 FR 72216 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation and Liability Act (``CERCLA'') Consistent with Section 122(d)(2) of CERCLA, 42 U.S.C. 9622(d)(2), notice is hereby given that on November 7, 2011, a proposed Consent Decree in The General...

  1. 78 FR 63978 - Proposed CERCLA Settlements Relating to the Truckers Warehouse Site in Passaic, Passaic County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... thus are potentially liable for response costs incurred at or in connection with the Truckers Warehouse... Costs (``Agreements'') pursuant to Section 122(h)(1) of CERCLA, with (1) RJS Corp.; (2) Your Factory... Parties agree to pay a total of $108,748.20 to EPA for past response costs. EPA will consider all comments...

  2. 77 FR 42310 - Proposed CERCLA Administrative Cost Recovery Settlement; City of Middletown, CT and RLO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... City of Middletown, Connecticut to pay $2,800,000 to the Hazardous Substance Superfund in five equal... Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. Section 9622(i), notice is hereby given of...: (1) the City of Middletown, Connecticut to pay $2,800,000 to the Hazardous Substance Superfund in...

  3. Administrative Settlement Agreement and Order on Consent for Removal Action, in the Matter of: Forshaw Chemicals Site, Charlotte, Mecklenburg County, North Carolina, Forshaw Chemicals, Inc. Respondent, CERCLA DOCKET NO. 04-2009-3979

    EPA Pesticide Factsheets

    Contains legal agreement for the Forshaw Chemicals site under CERCLA Sections 104, 106(a), 107 and 122, Charlotte, Mecklenburg County, North Carolina, August 17, 2009 Region ID: 04 DocID: 10427285, DocDate: 08-17-2009

  4. 75 FR 51267 - Proposed Cercla Administrative Order On Consent for the Kerber Creek Site, Saguache County, CO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... sections 104, 106, 107, and 122 of CERCLA, 42 U.S.C. 9604, 9606, 9607, and 9622, between EPA and Trout Unlimited, Inc. (``Trout Unlimited'') regarding the Kerber Creek Site located in the Rio Grande Basin near..., and extending to the town of Villa Grove. This AOC requires that Trout Unlimited perform the following...

  5. QA/QC requirements for physical properties sampling and analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Innis, B.E.

    1993-07-21

    This report presents results of an assessment of the available information concerning US Environmental Protection Agency (EPA) quality assurance/quality control (QA/QC) requirements and guidance applicable to sampling, handling, and analyzing physical parameter samples at Comprehensive Environmental Restoration, Compensation, and Liability Act (CERCLA) investigation sites. Geotechnical testing laboratories measure the following physical properties of soil and sediment samples collected during CERCLA remedial investigations (RI) at the Hanford Site: moisture content, grain size by sieve, grain size by hydrometer, specific gravity, bulk density/porosity, saturated hydraulic conductivity, moisture retention, unsaturated hydraulic conductivity, and permeability of rocks by flowing air. Geotechnical testing laboratories alsomore » measure the following chemical parameters of soil and sediment samples collected during Hanford Site CERCLA RI: calcium carbonate and saturated column leach testing. Physical parameter data are used for (1) characterization of vadose and saturated zone geology and hydrogeology, (2) selection of monitoring well screen sizes, (3) to support modeling and analysis of the vadose and saturated zones, and (4) for engineering design. The objectives of this report are to determine the QA/QC levels accepted in the EPA Region 10 for the sampling, handling, and analysis of soil samples for physical parameters during CERCLA RI.« less

  6. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less

  7. DEACTIVATION AND DECOMMISSIONING ENVIRONMENTAL STRATEGY FOR THE PLUTONIUM FINISHING PLANT COMPLEX, HANFORD NUCLEAR RESERVATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hopkins, A.M.; Heineman, R.; Norton, S.

    Maintaining compliance with environmental regulatory requirements is a significant priority in successful completion of the Plutonium Finishing Plant (PFP) Nuclear Material Stabilization (NMS) Project. To ensure regulatory compliance throughout the deactivation and decommissioning of the PFP complex, an environmental regulatory strategy was developed. The overall goal of this strategy is to comply with all applicable environmental laws and regulations and/or compliance agreements during PFP stabilization, deactivation, and eventual dismantlement. Significant environmental drivers for the PFP Nuclear Material Stabilization Project include the Tri-Party Agreement; the Resource Conservation and Recovery Act of 1976 (RCRA); the Comprehensive Environmental Response, Compensation and Liability Actmore » of 1980 (CERCLA); the National Environmental Policy Act of 1969 (NEPA); the National Historic Preservation Act (NHPA); the Clean Air Act (CAA), and the Clean Water Act (CWA). Recent TPA negotiation s with Ecology and EPA have resulted in milestones that support the use of CERCLA as the primary statutory framework for decommissioning PFP. Milestones have been negotiated to support the preparation of Engineering Evaluations/Cost Analyses for decommissioning major PFP buildings. Specifically, CERCLA EE/CA(s) are anticipated for the following scopes of work: Settling Tank 241-Z-361, the 232-Z Incinerator, , the process facilities (eg, 234-5Z, 242, 236) and the process facility support buildings. These CERCLA EE/CA(s) are for the purpose of analyzing the appropriateness of the slab-on-grade endpoint Additionally, agreement was reached on performing an evaluation of actions necessary to address below-grade structures or other structures remaining after completion of the decommissioning of PFP. Remaining CERCLA actions will be integrated with other Central Plateau activities at the Hanford site.« less

  8. Validation of Passive Sampling Devices for Monitoring of Munitions Constituents in Underwater Environments

    DTIC Science & Technology

    2017-09-01

    Compensation, and Liability Act (CERCLA) and U.S. Environmental Policy Act (USEPA) requirements to protect both human health /safety and...former VNTR is based on potential risks to human health and the environment identified via the CERCLA process, together with applicable or relevant and...evaluation. National Oceanic and Atmospheric Administration Data. Isla de Vieques. U.S. Department of Health and Human Services, Agency for Toxic

  9. No Further Action Decision Under CERCLA, Study Area 43B, Historic Gas Station Sites, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    I U.S. Army EnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA * STUDY AREA 43B HISTORIC GAS STATION SITES U FORT DEVENS , MASSACHUSETTS I I... FORT DEVENS , MASSACHUSETTS I I i * Prepared for: U.S. Army Environmental Center Aberdeen Proving Ground, Maryland Contract DAAA15-91-0008 I Prepared...HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS Section Title Page No. EXECUTIVE SUMMARY

  10. Cleanup liability and the Constitution

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Friedland, D.M.; Hagen, P.E.

    It was observed in the July 1992 issue of this Journal that a plain reading of the Constitution's prohibition on [open quotes][ital ex post facto][close quotes] suggests that some environmental statutes such as the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA or Superfund) and the Resource Conservation and Recovery Act of 1976 (RCRA) conflict with Constitutional principles. Like many Constitutional principles, however, the Supreme Court's interpretation of the Constitution's bar on [ital ex post facto] laws has a long history. The Court has consistently interpreted this clause as limited to criminal or penal statutes. This article discussesmore » the history of the [ital ex post facto] clause, the retroactive application of CERCLA and RCRA, the decision that retroactive application of CERCLA and RCRA does not violate the [ital ex post facto] clause, and laws, regulations, and guidance. 27 refs.« less

  11. Managing previously disposed waste to today's standards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-01-01

    A Radioactive Waste Management Complex (RWMC) was established at the Idaho National Engineering Laboratory (INEL) in 1952 for controlled disposal of radioactive waste generated at the INEL. Between 1954 and 1970 waste characterized by long lived, alpha emitting radionuclides from the Rocky Flats Plant was also buried at this site. Migration of radionuclides and other hazardous substances from the buried Migration of radionuclides and other hazardous substances from the buried waste has recently been detected. A Buried Waste Program (BWP) was established to manage cleanup of the buried waste. This program has four objectives: (1) determine contaminant sources, (2) determinemore » extent of contamination, (3) mitigate migration, and (4) recommend an alternative for long term management of the waste. Activities designed to meet these objectives have been under way since the inception of the program. The regulatory environment governing these activities is evolving. Pursuant to permitting activities under the Resource Conservation and Recovery Act (RCRA), the Department of Energy (DOE) and the Environmental Protection Agency (EPA) entered into a Consent Order Compliance Agreement (COCA) for cleanup of past practice disposal units at the INEL. Subsequent to identification of the RWMC as a release site, cleanup activities proceeded under dual regulatory coverage of RCRA and the Atomic Energy Act. DOE, EPA, and the State of Idaho are negotiating a RCRA/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interagency Agreement (IAG) for management of waste disposal sites at the INEL as a result of the November 1989 listing of the INEL on the National Priority List (NPL). Decision making for selection of cleanup technology will be conducted under the CERCLA process supplemented as required to meet the requirements of the National Environmental Policy Act (NEPA). 7 figs.« less

  12. No Further Action Decision Under CERCLA Study Area 43N Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND, MARYLAND JANUARY 1995 PRINTED ON...HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS I . Prepared for: U.S. Army Environmental Center Aberdeen Proving Ground, Maryland Contract DAAA15-91...DECISION UNDER CERCLA STUDY AREA 43N HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS 3 TABLE OF CONTENTS U Section Title Page No. EXECUTIVE SUMMARY

  13. No Further Action Decision Under Cercla Study Area 61Z Building 202 Historic Motor Pool

    DTIC Science & Technology

    2000-01-01

    appropriate response actions are implemented at Fort Devens under CERCLA. AOC 61Z is the former site of a motor pool at the corner of Carey and St. Mihiel...provided recommendations for response actions with the objective of identifying priorities for environmental restoration at Fort Devens . Areas...a final permit that included a list of Solid Waste Management Units requiring corrective action . In December 1989, Fort Devens was placed on the

  14. Installation Restoration Program. Preliminary Assessment: 232nd Combat Communications Squadron, Montgomery Air National Guard Station, Alabama Air National Guard, Montgomery, Alabama

    DTIC Science & Technology

    1991-02-01

    analysis of water, soil, and/or sediment samples, are required. Careful documentation and quality control procedures in accordance with CERCLA/SARA...I III-1 I I Northern Piedmont * AI Southern Piedmont a’.3 Cahaba Valley... ...... Coosa ValleyI Fall Line Hills Aluvial Plain Black Prairie3 Cu enu e...no surface outlet; (b) A drainage basin or river basin; (c) A low area in the Earth’s crust, of tectonic origin, in which sediments have accumulated

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, G.C.

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less

  16. No Further Action Decision Under CERCLA Study Area 43K Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    with the same. AMES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRNE Date Fort Devens l(emedial...STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND, MARYLAND JANUARY 1995 PRINTED ON...Distribution Unlimited U.S. ArmyEnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43K HISTORIC GAS STATION SITES FORT DEVENS ,9

  17. No Further Action Decision Under CERCLA, Study Area 31, Moore Army Airfield Fire Fighting Training Area, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    FURTHER ACTION DECISION UNDER CERCLAI STUDY AREA 31 MOORE ARMY AIRFIELD FIRE FIGHTING TRAINING AREA FORT DEVENS , MASSACHUSETFS TABLE OF CONTENTS jSection...Inc. 31DD.DOC 6917.11 111,, NO FURTHER ACTION DECISION UNDER CERCLA I STUDY AREA 31 MOORE ARMY AIRFIELD FIRE FIGHTING TRAINING AREA 3 FORT DEVENS ...Fire Fighting Training Area) at Fort Devens , Massachusetts, have resulted in the decision that no further studies or remediation are required at this

  18. FF Site Information

    EPA Pesticide Factsheets

    This asset includes the EPA Federal Agency Hazardous Waste Compliance Docket (Docket), which is required by Section 120(c) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The Docket contains information reported to EPA by federal facilities that manage hazardous waste or from which hazardous substances, pollutants or contaminants have been or may be released. The Docket serves three major purposes:1. To identify all federal facilities that must be evaluated through the site assessment process to determine whether they pose a risk to human health and the environment sufficient to warrant inclusion on the National Priorities List (NPL); 2. To compile and maintain the information submitted to EPA on such facilities under the provisions listed in section 120(c) of CERCLA; and3. To provide a mechanism to make the information available to the public.The docket includes facilities which have provided information to EPA through documents such as reports under a Federal agency environmental restoration program, regardless of the absence of section 103 reporting. E-Docket is an internal business management tool that will improve the tracking and record keeping of information about facilities that have been identified as potential Docket sites. The functionality of the system is basic record tracking, and it will contain a list of draft proposed facilities which can be sorted based on Agency ownership, region, or status (Draft Propose

  19. HEALTH AND ENVIRONMENTAL EFFECTS DOCUMENT ...

    EPA Pesticide Factsheets

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). This document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits and goals for emergency and remedial actions under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Both published literature and information obtained from Agency Program Office files are evaluated as they pertain to potential human health, aquatic life and environmental effects of hazardous waste constituents. Several quantitative estimates are presented provided sufficient data are available. For systemic toxicants, these include Reference Doses (RfDs) for chronic and subchronic exposures for both the inhalation and oral exposures. In the case of suspected carcinogens, RfDs may not be estimated. Instead, a carcinogenic potency factor, or q1*, is provided. These potency estimates are derived for both oral and inhalation exposures where possible. In addition, unit risk estimates for air and drinking water are presented based on inhalation and oral data, respectively. Reportable quantities (RQs) based on both chronic toxicity and carcinogenicity are derived. The RQ is used to determine the quantity of a hazardous substance for which notification is required in the event of a release as specified under CERCLA.

  20. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  1. Hazardous Substance Release Reporting Under CERCLA, EPCR {section}304 and DOE Emergency Management System (EMS) and DOE Occurrence Reporting Requirements. Environmental Guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Traceski, T.T.

    1994-06-01

    Releases of various substances from DOE facilities may be subject to reporting requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA), as well as DOE`s internal ``Occurrence Reporting and Processing of Operations Information`` and the ``Emergency Management System`` (EMS). CERCLA and EPCPA are Federal laws that require immediate reporting of a release of a Hazardous Substance (HS) and an Extremely Hazardous Substance (EHS), respectively, in a Reportable Quantity (RQ) or more within a 24-hour period. This guidance uses a flowchart, supplemental information, and tables to provide an overview ofmore » the process to be followed, and more detailed explanations of the actions that must be performed, when chemical releases of HSs, EHSs, pollutants, or contaminants occur at DOE facilities. This guidance should be used in conjunction with, rather than in lieu of, applicable laws, regulations, and DOE Orders. Relevant laws, regulations, and DOE Orders are referenced throughout this guidance.« less

  2. Brownfields and Land Revitalization Programmatic Information

    EPA Pesticide Factsheets

    This asset contains resources provided by EPA's Brownfields and Land Revitalization program that can be used for the assessment, cleanup, and redevelopment of brownfields sites and land revitalization activities. To help implement the program, EPA provides information on the Brownfields law, success stories from Brownfields grantees, technical information and resources to aid in the assessment and cleanup of brownfields properties, partnerships to promote the cleanup and reuse of Brownfields, and initiatives that explore sector-based solutions, enhance environmental quality, spur economic development, and revitalize communities. This asset includes fact sheets, success stories, training, policy, and guidance documents. Regulatory authority for the collection and use of this information is found in the Small Business Liability Relief and Brownfields Revitalization Act of 2002 (the Brownfields Law), which amended the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980.

  3. Rocky Flats Environmental Technology Site Ecological Monitoring Program 1995 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-05-31

    The Ecological Monitoring Program (ECMP) was established at the Rocky Flats Environmental Technology Site (Site) in September 1992. At that time, EcMP staff developed a Program Plan that was peer-reviewed by scientists from western universities before submittal to DOE RFFO in January 1993. The intent of the program is to measure several quantitative variables at different ecological scales in order to characterize the Rocky Flats ecosystem. This information is necessary to document ecological conditions at the Site in impacted and nonimpacted areas to determine if Site practices have had ecological impacts, either positive or negative. This information can be usedmore » by managers interested in future use scenarios and CERCLA activities. Others interested in impact analysis may also find the information useful. In addition, these measurements are entered into a database which will serve as a long-term information repository that will document long-term trends and potential future changes to the Site, both natural and anthropogenic.« less

  4. Engineering Evaluation/Cost Analysis (EE/CA) for Decommissioning of TAN-607 Hot Shop Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. P. Floerke

    Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho National Laboratory (INL) Site. U.S. Department of Energy Idaho Operations Office (DOE-ID) is proposing to decommission the northern section of the TAN-607 facility, hereinafter referred to as TAN-607 Hot Shop Area, under a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) non-time-critical removal action (NTCRA). Despite significant efforts by the United States (U.S.) Department of Energy (DOE) to secure new business, no future mission has been identified for the TAN-607 Hot Shop Area. Its disposition has been agreed to by the Idahomore » State Historical Preservation Office documented in the Memorandum of Agreement signed October 2005 and it is therefore considered a surplus facility. A key element in DOE's strategy for surplus facilities is decommissioning to the maximum extent possible to ensure risk and building footprint reduction and thereby eliminating operations and maintenance cost. In addition, the DOE's 2006 Strategic Plan is ''complete cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States. DOE is responsible for the risk reduction and cleanup of the environmental legacy of the Nation's nuclear weapons program, one of the largest, most diverse, and technically complex environmental programs in the world. The Department will successfully achieve this strategic goal by ensuring the safety of the DOE employees and U.S. citizens, acquiring the best resources to complete the complex tasks, and managing projects throughout the United States in the most efficient and effective manner.'' TAN-607 is designated as a historical Signature Property by DOE Headquarters Advisory Council on Historic Preservation and, as such, public participation is required to determine the final disposition of the facility. The decommissioning action will place the TAN-607 Hot Shop Area in a final configuration that will be protective of human health and the environment. Decommissioning the TAN-607 Hot Shop Area is consistent with the joint DOE and U.S. Environmental Protection Agency (EPA) Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation and Liability Act, which establishes the CERCLA NTCRA process as the preferred approach for decommissioning surplus DOE facilities. Under this policy, a NTCRA may be taken when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to human health and/or the environment. When DOE determines that a CERCLA NTCRA is necessary, DOE is authorized to evaluate, select, and implement the removal action that DOE determines is most appropriate to address the potential risk posed by the release or threat of release. This action is taken in accordance with applicable authorities and in conjunction with EPA and the State of Idaho pursuant to Section 5.3 of the Federal Facility Agreement and Consent Order. In keeping with the joint policy, this engineering evaluation/cost analysis (EE/CA) was developed in accordance with CERCLA as amended by the ''Superfund Amendments and Reauthorization Act of 1986'' and in accordance with the ''National Oil and Hazardous Substances Pollution Contingency Plan.'' This EE/CA is consistent with the remedial action objectives (RAOs) of the Final Record of Decision, Test Area North, Operable Unit 1-10 and supports the overall remediation goals established through the Federal Facility Agreement and Consent Order for Waste Area Group 1. Waste Area Group 1 is located at TAN.« less

  5. Verification of EPA's " Preliminary remediation goals for radionuclides" (PRG) electronic calculator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stagich, B. H.

    The U.S. Environmental Protection Agency (EPA) requested an external, independent verification study of their “Preliminary Remediation Goals for Radionuclides” (PRG) electronic calculator. The calculator provides information on establishing PRGs for radionuclides at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites with radioactive contamination (Verification Study Charge, Background). These risk-based PRGs set concentration limits using carcinogenic toxicity values under specific exposure conditions (PRG User’s Guide, Section 1). The purpose of this verification study is to ascertain that the computer codes has no inherit numerical problems with obtaining solutions as well as to ensure that the equations are programmed correctly.

  6. Installation Restoration Program (IRP) Stage 7, Remedial Investigation/ Feasibility Study Comprehensive CERCLA Work PLan for McClellan AFB/EM, McClellan AFB, California

    DTIC Science & Technology

    1991-07-01

    Systems Audits ; Preventive Maintenance; Data Assessment Procedures; Corrective Action; Quality Assurance Reports; and Site Management. General Data Quality...for verification and quality control audits . A copy of the QAPP will be in the possession of field sampling teams for all sampling efforts...L cc- acca C wi w-C P-3-- C I- usu 2; - at C4~~2 Q (( c ccc c-c C- 0L U -C 3- au S - - C3 . - acu tr - -a CL.43 C LU -C2 -C ul 0it S w- -C u Ocw - z i

  7. Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W10-33 and 299-W11-48

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newcomer, Darrell R.

    2007-09-30

    Slug-test results obtained from single and multiple, stress-level slug tests conducted during drilling and borehole advancement provide detailed hydraulic conductivity information at two Hanford Site Operable Unit (OU) ZP-1 test well locations. The individual test/depth intervals were generally sited to provide hydraulic-property information within the upper ~10 m of the unconfined aquifer (i.e., Ringold Formation, Unit 5). These characterization results complement previous and ongoing drill-and-test characterization programs at surrounding 200-West and -East Area locations (see Figure S.1).

  8. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 3. Risk assessment information. Appendixes E, F

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 3 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  9. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 3: Appendixes E and F -- Risk assessment information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  10. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Biota and representative concentrations of contaminants. Appendixes A, B, C, D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OU`s). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  11. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, and D-Biota and representative concentrations of contaminants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 2 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  12. RCRA, Superfund Monthly Hotline reports. Monthly report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    The RCRA/SF Hotline quickly responds to questions related to the Resource Conservation and Recovery Act (RCRA), the comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Underground Storage Tanks (UST) program, the Superfund Amendments Reauthorization Act (SARA), and the Chemical emergency Preparedness (CEPP) Community Right-to-know Act/Title III program. The hotline is the mechanism for EPA's response to inquiries from the public and regulated community; the referral point for document availability; the dissemination of changing information; and the primary means for answering factual questions on EPA regulations and policies. The Monthly Hotline Reports contain questions posed by the callers that were eithermore » significant and required the EPA to resolve the issues or were the most frequently asked questions. Also included in the Reports are the Federal Register summaries, publications availabilities, and call statistics.« less

  13. Remedial investigation work plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    More than 200 contaminated sites created by past waste management practices have been identified at the Y-12 Plant. Many of the sites have been grouped into operable units based on priority and on investigative and remediation requirements. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines andmore » requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions.« less

  14. Community Environmental Response Facilitation Act (CERFA) report, Fort Benjamin Harrison, Indiana. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    Fort Benjamin Harrison (FBH) has been investigated by Arthur D. Little, Inc. under the Community Environmental Response Facilitation Act (CERFA). FBH is located 12 miles northeast of downtown Indianapolis, Indiana. The installation's mission includes administrative and training activities. The objective of CERFA is to expeditiously identify real property offering the greatest opportunity for immediate reuse and redevelopment. This investigation included interviews, visual inspections, and review of existing documents, regulatory records, data bases, and title documents. This information was used to divide the installation into four categories of parcels. CERFA parcels approximately 1,825 acres of the facility have no history ofmore » Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) regulated hazardous substance or petroleum product release, disposal, or storage. CERFA parcels with qualifiers approximately 78 acres had no evidence of such release, disposal, or storage, but contained non-CERCLA hazards, such as asbestos or radon. CERFA disqualified parcels for approximately 399 acres of the investigated areas there is a history of release, disposal, or storage for one year or more of CERCLA-regulated hazardous substances or petroleum products; and CERFA excluded parcels approximately 201 acres have an existing mandate for retention by the federal government or have already been designated for transfer.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Feasibility Study (FS) Report has been prepared for the Air National Guard Readiness Center (ANORC) under the U.S. Department of Defense`s (DOD) Installation Restoration Program (IRP). The purpose of this FS is to screen and evaluate potential remediation alternatives for IRP sites and areas of concern (AOC) at the Kellogg Memorial Airport in Battle Creek, Michigan that have previously been identified as having contaminated soil and/or groundwater. This FS has been prepared pursuant to the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA). Montgomery Watson hasmore » been contracted to prepare this FS report under contract DAHA90-94-D-0013, Delivery Order 13.« less

  16. 14 CFR § 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Establishment of NASA Program Identifiers... THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified Visual Communications...

  17. CERCLA and EPCRA Continuous Release Reporting

    EPA Pesticide Factsheets

    Congress established reportable quantities for Superfund hazardous substances. A continuous release of a hazardous substance is defined as being without interruption or abatement and stable in quantity and rate.

  18. 14 CFR § 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Use of the NASA Program Identifiers. Â... NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype, NASA Program Identifiers, NASA Flags, and the Agency's Unified Visual Communications System...

  19. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri. Environmental assessment: Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacDonell, M.M.; Peterson, J.M.

    1991-11-01

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this timemore » has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impact associated with the proposed action.« less

  20. Guidance: Treatment of Insurers Under Superfund

    EPA Pesticide Factsheets

    Guidance provides EPA Regional offices with the appropriate procedures to follow in issuing notice letters, developing referrals, and tracking CERCLA enforcement cases that may include insurers as third party defendants.

  1. Remedial Investigation Report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-01-01

    This report on the BCV OU 2 at the Y-12 Plant, was prepared in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for reporting the results of a site characterization for public review. It provides the Environmental Restoration Program with information about the results of the 1993 investigation. It includes information on risk assessments that have evaluated impacts to human health and the environment. Field activities included collection of subsurface soil samples, groundwater and surface water samples, and sediments and seep at the Rust Spoil Area (RSA), SY-200 Yard, and SA-1.

  2. Administrative Order - Cherokee Oil

    EPA Pesticide Factsheets

    Contains legal consent agreement for Cherokee Oil Resources under CERCLA section 122(g) (4), Charlotte, Mecklenburg County, North Carolina, August 4, 1997 Region ID: 04 DocID: 28332, DocDate: 08-04-1997

  3. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    NASA Administrator Michael Griffin is seen through a television camera at a NASA Update announcing to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Griffin was joined by Scott J. Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, right. Dean Acosta, NASA Deputy Assistant Administrator and Press Secretary, far left, moderates the program. Photo Credit: (NASA/Bill Ingalls)

  4. NASA's educational programs

    NASA Technical Reports Server (NTRS)

    Brown, Robert W.

    1990-01-01

    The educational programs of NASA's Educational Affairs Division are examined. The problem of declining numbers of science and engineering students is reviewed. The various NASA educational programs are described, including programs at the elementary and secondary school levels, teacher education programs, and undergraduate, graduate, and university faculty programs. The coordination of aerospace education activities and future plans for increasing NASA educational programs are considered.

  5. Parker Street Waste Site | New England | US EPA

    EPA Pesticide Factsheets

    2017-09-18

    EPA is conducting sampling and other response actions at Parker Street Waste Site according to its authority under Secton 104 of the Comprehensive Environmental Response, Compensaton, and Liability Act (CERCLA).

  6. Guidance: CERCLA Section 106 Judicial Actions

    EPA Pesticide Factsheets

    This guidance provides criteria for consideration in selecting and initiating Section 106 judicial actions. The guidance also identifies and discusses issues that should be considered in preparation of a Section 106 referral.

  7. Science at NASA field centers: Findings and recommendations on the scope, strength and interactions of science and science-related technology programs

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Great achievements by NASA and other space agencies have shown us what opportunities lie in the opening of the space frontier. A broad and vigorous science program in NASA is vital to full U.S. exploitation of these new opportunities. Today, science in NASA Centers is characterized by its breadth, relevance, and excellence. The NASA in-house science program and its links to university programs constitute a vitally important national resource. Maintaining excellence as a foundation for the future is a fundamental responsibility of NASA, one that requires constant attention and effort. This report by the NASA Center Science Assessment Team documents the current state of science within NASA and recommends actions to maintain a healthy program. NASA scientists have always played key roles in planning, guiding, and conducting national programs in space science. The review of Center science programs is intended to ensure that both NASA and the nation can depend on their continuing contribution in these roles.

  8. The NASA Scientific and Technical Information Program: Prologue to the Future

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The NASA STI Program offers researchers an infrastructure of people and systems that facilitates access to STI; worldwide. The Program is also NASA's institutional mechanism for disseminating the results of its research and developing activities. Through discussions in 1991, the STI Program formulated its Strategic Plan. The plan gives the Program a renewed sense of direction by focusing on future opportunities, customer requirements and Program goals, along with the changes needed to achieve those goals. The Program provides users access to a massive flow of STI which, in fact, represents the largest collection of aeronautical and space science information in the world. The STI Program products and services are outlined, along with the NASA centers, international operations, and the fact that total quality management drives NASA wide program developments. As is detailed, the NASA STI Program is using its resources as effectively as possible to meet the missing needs of NASA.

  9. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  10. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  11. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  12. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  13. Consolidated List of Lists

    EPA Pesticide Factsheets

    List of chemicals subject to reporting requirements under the Emergency Planning and Community Right- To-Know Act (EPCRA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and Section 112(r) of the Clean Air Act.

  14. Options for streamlining the site assessment process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, R.

    The current site assessment process consists of entry into the CERCLA Information System (CERCLIS) database; completion of the Preliminary Assessment (PA), Site Inspection (SI), and Hazard Ranking System (HRS) documents; and placement on the National Priorities List (NPL). The purpose behind site assessment has been to identify sites for the NPL, not identify the most appropriate means for clearup. Several developments have led EPA to consider redesigning the process, including; the need to encourage brownfields redevelopment; the unintended stigma associated with being on CERCLIS; and the increased expertise of State and some Tribal programs. (For purposes of this paper, brownfieldsmore » are considered abandoned, idled, or under-used industrial and commercial facilities where expansion or redevelopment is complicated by real or perceived environmental contamination.) EPA has begun various site assessment pilots to aid in developing a more efficient and effective Superfund site assessment program. Key goals are to give States increased responsibility, encourage early/more efficient cleanups, reduce costs, and promote environmental recovery and economic revitalization. Possible components of a revised site assessment program are presented.« less

  15. 2002 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim (Editor); Black, Cassandra (Editor)

    2002-01-01

    This document is a collection of technical reports on research conducted by the participants in the 2002 NASA/ASEE Faculty Fellowship Program at the John F. Kennedy Space Center (KSC). This was the 18th year that a NASA/ASEE program has been conducted at KSC. The 2002 program was administered by the University of Central Florida (UCF) in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) and the Education Division, NASA Headquarters, Washington, D.C. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 2002. The KSC Faculty Fellows spent ten weeks working with NASA scientists and engineers on research of mutual interest to the university faculty member and the NASA colleague. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many research areas of current interest to NASA/KSC. The NASA/ASEE program is intended to be a two-year program to allow in-depth research by the university faculty member.

  16. NASA and the United States educational system - Outreach programs in aeronautics, space science, and technology

    NASA Technical Reports Server (NTRS)

    Owens, Frank C.

    1990-01-01

    The role of NASA in developing a well-educated American work force is addressed. NASA educational programs aimed at precollege students are examined, including the NASA Spacemobile, Urban Community Enrichment Program, and Summer High School Apprenticeship Program. NASA workshops and programs aimed at helping teachers develop classroom curriculum materials are described. Programs aimed at college and graduate-level students are considered along with coordination efforts with other federal agencies and with corporations.

  17. 1999 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    2000-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1999 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 15th year that a NASA/ASEE program has been conducted at KSC. The 1999 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE and the Education Division, NASA Headquarters, Washington, DC, and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1999. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member.

  18. 77 FR 69620 - Casmalia Disposal Site; Notice of Proposed CERCLA Administrative De Minimis Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... Research Corp, American Chemical Etching, American Magnetics Corporation, American Rubber Manufacturing... Unified School District, Santa Clara Valley Water District, Santa Maria Ford, Santa Maria Valley Warehouse...

  19. Summary of the Comprehensive Environmental Response, Compensation, and Liability Act (Superfund)

    EPA Pesticide Factsheets

    CERCLA provides a Federal Superfund to clean up uncontrolled or abandoned hazardous-waste sites as well as accidents, spills, and other emergency releases of pollutants and contaminants into the environment

  20. 78 FR 70256 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... Indiana Department of Environmental Management (IDEM), has determined that all appropriate response actions under CERCLA, other than operation, maintenance, and five-year reviews have been completed...

  1. 77 FR 74192 - Availability of Final Toxicological Profiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Road NE., Atlanta, Georgia 30333; telephone number (800) 232-4636 or (770)488-3351. Electronic access... literature, research, and studies on the health effects of toxic substances'' under CERCLA Section 104(i)(1...

  2. 77 FR 123 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling party: Waste Management Recycling & Disposal Services of California, Inc., dba Bradley Landfill & Recycling Center. The settlement requires the settling party to pay a total of $185,734 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling party pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  3. 76 FR 77528 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  4. 76 FR 79678 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  5. Remedial Investigation/Feasibility Study (RI/FS) process, elements and techniques guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This manual provides detailed guidance on Remedial Investigation/Feasibility Studies (RI/FSs) conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Department of Energy (DOE) facilities. The purpose of the RI/FS, to assess the risk posed by a hazardous waste site and to determine the best way to reduce that risk, and its structure (site characterization, risk assessment, screening and detailed analysis of alternatives, etc.) is defined in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and further explained in the Environmental Protection Agency`s (EPA`s) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (Interimmore » Final) 540/G-89/004, OSWER Directive 9355.3-01, October 1988. Though issued in 1988, the EPA guidance remains an excellent source of information on the conduct and structure of an RI/FS. This document makes use of supplemental RI/FS-related guidance that EPA has developed since its initial document was issued in 1988, incorporates practical lessons learned in more than 12 years of experience in CERCLA hazardous site remediation, and drawing on those lessons, introduces the Streamlined Approach For Environmental Restoration (SAFER), developed by DOE as a way to proceed quickly and efficiently through the RI/FS process at DOE facilities. Thus as its title implies, this guidance is intended to describe in detail the process and component elements of an RI/FS, as well as techniques to manage the RI/FS effectively.« less

  6. NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Johnson, Roger (Editor); Buckingham, Gregg (Editor)

    1996-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1996 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the twelfth year that a NASA/ASEE program has been conducted at KSC. The 1996 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, DC and KSC. The KSC Program was one of nine such Aeronautics and Space Research Program funded by NASA in 1996. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the University faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  7. 2000 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    2001-01-01

    This document is a collection of technical reports on research conducted by the participants in the 2000 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 16th year that a NASA/ASEE program has been conducted at KSC. The 2000 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Education Division, NASA Headquarters, Washington, D.C., and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA in 2000. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  8. NASA/ASEE Summer Faculty Fellowship Program. 1994 research reports

    NASA Technical Reports Server (NTRS)

    Anderson, Loren A. (Editor); Hosler, E. Ramon (Editor); Camp, Warren (Editor)

    1994-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1994 NASA/ASEE Summer Faculty Fellowship Program at Kennedy Space Center (KSC). This was the tenth year that a NASA/ASEE program has been conducted at KSC. The 1994 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, D.C. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1994. The NASA/ASEE program is intended to be a two-year program to allow in-depth research by the University faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  9. 1997 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    1997-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1997 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 13th year that a NASA/ASEE program has been conducted at KSC. The 1997 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Education Division, NASA Headquarters, Washington, D.C., and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA in 1997. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  10. 1998 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    1999-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1998 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the 14th year that a NASA/ASEE program has been conducted at KSC. The 1998 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Education Division, NASA Headquarters, Washington, D.C., and KSC. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA in 1998. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the university faculty member. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many problems of current interest to NASA/KSC.

  11. NASA/ASEE Faculty Fellowship Program: 2003 Research Reports

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim (Editor); LopezdeCastillo, Eduardo (Editor)

    2003-01-01

    This document is a collection of technical reports on research conducted by the participants in the 2003 NASA/ASEE Faculty Fellowship Program at the John F. Kennedy Space Center (KSC). This was the nineteenth year that a NASA/ASEE program has been conducted at KSC. The 2003 program was administered by the University of Central Florida (UCF) in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) and the Education Division, NASA Headquarters, Washington, D.C. The KSC program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 2003. The basic common objectives of the NASA/ASEE Faculty Fellowship Program are: A) To further the professional knowledge of qualified engineering and science faculty members; B) To stimulate an exchange of ideas between teaching participants and employees of NASA; C) To enrich and refresh the research and teaching activities of participants institutions; D) To contribute to the research objectives of the NASA center. The KSC Faculty Fellows spent ten weeks (May 19 through July 25, 2003) working with NASA scientists and engineers on research of mutual interest to the university faculty member and the NASA colleague. The editors of this document were responsible for selecting appropriately qualified faculty to address some of the many research areas of current interest to NASA/KSC. A separate document reports on the administrative aspects of the 2003 program. The NASA/ASEE program is intended to be a two-year program to allow in-depth research by the university faculty member. In many cases a faculty member has developed a close working relationship with a particular NASA group that had provided funding beyond the two-year limit.

  12. NASA Ambassadors: A Speaker Outreach Program

    NASA Technical Reports Server (NTRS)

    McDonald, Malcolm W.

    1998-01-01

    The work done on this project this summer has been geared toward setting up the necessary infrastructure and planning to support the operation of an effective speaker outreach program. The program has been given the name, NASA AMBASSADORS. Also, individuals who become participants in the program will be known as "NASA AMBASSADORS". This summer project has been conducted by the joint efforts of this author and those of Professor George Lebo who will be issuing a separate report. The description in this report will indicate that the NASA AMBASSADOR program operates largely on the contributions of volunteers, with the assistance of persons at the Marshall Space Flight Center (MSFC). The volunteers include participants in the various summer programs hosted by MSFC as well as members of the NASA Alumni League. The MSFC summer participation programs include: the Summer Faculty Fellowship Program for college and university professors, the Science Teacher Enrichment Program for middle- and high-school teachers, and the NASA ACADEMY program for college and university students. The NASA Alumni League members are retired NASA employees, scientists, and engineers. The MSFC offices which will have roles in the operation of the NASA AMBASSADORS include the Educational Programs Office and the Public Affairs Office. It is possible that still other MSFC offices may become integrated into the operation of the program. The remainder of this report will establish the operational procedures which will be necessary to sustain the NASA AMBASSADOR speaker outreach program.

  13. NASA EEE Parts and NASA Electronic Parts and Packaging (NEPP) Program Update 2018

    NASA Technical Reports Server (NTRS)

    Label, Kenneth A.; Sampson, Michael J.; Pellish, Jonathan A.; Majewicz, Peter J.

    2018-01-01

    NASA Electronic Parts and Packaging (NEPP) Program and NASA Electronic Parts Assurance Group (NEPAG) are NASAs point-of-contacts for reliability and radiation tolerance of EEE parts and their packages. This presentation includes an FY18 program overview.

  14. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  15. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  16. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  17. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  18. 48 CFR 1815.7001 - NASA Ombudsman Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA Ombudsman Program... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Ombudsman 1815.7001 NASA Ombudsman Program. NASA's implementation of an ombudsman program is in NPR 5101.33, Procurement Advocacy...

  19. NASA Year 2000 (Y2K) Program Plan

    NASA Technical Reports Server (NTRS)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  20. The 1995 Research Reports: NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Hosler, E. Ramon (Editor); Buckingham, Gregg (Editor)

    1995-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1995 NASA/ASEE Summer Faculty Fellowship Program at the Kennedy Space Center (KSC). This was the eleventh year that a NASA/ASEE program has been conducted at KSC. The 1995 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, D.C. The KSC Program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1995. The NASA/ASEE Program is intended to be a two-year program to allow in-depth research by the University faculty member.

  1. NASA-OAI Collaborative Aerospace Research and Fellowship Program at NASA Glenn Research Center at Lewis Field

    NASA Technical Reports Server (NTRS)

    Heyward, Ann O.; Montegani, Francis J.

    2003-01-01

    During the summer of 2002, a IO-week activity for university faculty entitled the NASA-OAI Collaborative Aerospace Research and Fellowship Program (CFP) was conducted at the NASA Glenn Research Center in collaboration with the Ohio Aerospace Institute (OAI). This is a companion program to the highly successful NASA Faculty Fellowship Program and its predecessor, the NASA- ASEE Summer Faculty Fellowship Program, that operated for 38 years at Glenn. This year s program began officially on June 3, 2002 and continued through August 9, 2002. This report is intended primarily to summarize the research activities comprising the 2002 CFP Program at Glenn. Fifteen research summaries are included.

  2. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    NASA Administrator Michael Griffin, left, Scott J. Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, right, announce to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  3. NASA's Education Program

    NASA Technical Reports Server (NTRS)

    1993-01-01

    NASA's current education programs, which will be examined under its Strategic Plan for Education are presented. It is NASA's first goal to maintain this base - revising, expanding, or eliminating programs as necessary. Through NASA's second goal, new education reform initiatives will be added which specifically address NASA mission requirements, national educational reform, and Federal Coordinating Council for Science, Engineering, and Technology (FCCSET) priorities. The chapters in this publication are divided by educational levels, with additional sections on programs to improve the technological competence of students and on an array of NASA published materials to supplement programs. The resource section lists NASA's national and regional Teacher Resource Centers and introduces the reader to NASA's Central Operation of Resources for Educators (CORE), which distributes materials in audiovisual format.

  4. NASA Alumni League Dialogue

    NASA Image and Video Library

    2011-03-04

    Former NASA Administrator James Beggs is seen during a dialogue with present NASA Administrator Charles Bolden on the future of the space program, Friday, March 4, 2011, at NASA Headquarters in Washington. Beggs was NASA's sixth administrator serving from July 1981 to December 1985. The dialogue was part of the program “The State of the Agency: NASA Future Programs Presentation” sponsored by the NASA Alumni League with support from the AAS, AIAA, CSE and WIA.Photo Credit: (NASA/Paul E. Alers)

  5. Natural Resource Damages: Trustees

    EPA Pesticide Factsheets

    CERCLA and OPA authorize the United States, States, and Indian Tribes to act on behalf of the public as Natural Resource Trustees for natural resources under their respective trusteeship. OPA also authorizes foreign governments to act as Trustees.

  6. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the removal process, remedial investigation/ feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response...

  7. SURFACES PRELIMINARY REMEDIATION GOALS FOR RADIONUCLIDES (SPRG)

    EPA Science Inventory

    Internet based Calculational tool for establishing 10(-6) cancer risk based Preliminary Remediation Goals (PRGs) for radioactively contaminated outside hard surfaces (e.g., streets, sidewalks, slabs, and outside of buildings) for CERCLA remedial response actions.

  8. Agreement for Recovery of Response Costs

    EPA Pesticide Factsheets

    Contains legal agreement for the New Hanover County Airport Burn Pit Superfund site under CERCLA Section 122(h)(1), Wilmington, New Hanover County, North Carolina, November 21, 2006 DocID: 10301795, DocDate: 11-21-2006

  9. Chemical Safety Alert: First Responders’ Environmental Liability Due To Mass Decontamination Runoff

    EPA Pesticide Factsheets

    CERCLA's good Samaritan provisions protect responders such as the Chemical Weapons Improved Response Team during lifesaving actions. Once imminent threats are addressed, responders should contain contamination and avoid/mitigate environmental consequences.

  10. Laws and Executive Orders

    EPA Pesticide Factsheets

    Lists and links to descriptions of the major laws and executive orders that EPA administers and/or that guide EPA rulemakings, including the Clean Air Act, the Toxic Substance Control Act, CERCLA or Superfund, and the Clean Water Act.

  11. Agreement for Recovery of Past Response Costs - Georgia-Pacific Hardwod

    EPA Pesticide Factsheets

    Contains legal agreement for the Georgia-Pacific Hardwood Sawmill site under CERCLA Section 122(h)(1), Plymouth, Washington County, North Carolina, April 27, 2005 DocID: 10102191 , DocDate: 04-27-2005

  12. 75 FR 34448 - Proposed CERCLA Administrative Cost Recovery Settlement; Great Lakes Container Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... Cyanamid Company); Hubbard Hall, Inc.; Invesys, Inc. on behalf of Elmwood Sensors, Inc.; Chevron..., subsidiaries and divisions; BP Products North America, Inc.; Eastern Color & Chemical Company. Dated: June 3...

  13. Interim Guidance: Municipal Solid Waste Exemption under Superfund

    EPA Pesticide Factsheets

    Interim guidance discusses the statutory provisions of CERCLA § 107(p) and identifies some factors to be considered by EPA and DOJ staff in exercising their enforcement discretion of MSW at an NPL site.

  14. 75 FR 5715 - Identification of Additional Classes of Facilities for Development of Financial Responsibility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... addition, the Agency identified the Waste Management and Remediation Services industry (NAICS 562), the... Liability Act (CERCLA). In addition, the Agency identified the Waste Management and Remediation Services...

  15. NASA Alumni League Dialogue

    NASA Image and Video Library

    2011-03-04

    Former NASA Administrator James Beggs smiles during a dialogue on the future of the space program, Friday, March 4, 2011, at NASA Headquarters in Washington. Beggs was NASA's sixth administrator serving from July 1981 to December 1985. The dialogue was part of the program “The State of the Agency: NASA Future Programs Presentation” sponsored by the NASA Alumni League with support from the AAS, AIAA, CSE and WIA.Photo Credit: (NASA/Paul E. Alers)

  16. Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A. Volume 14

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1998-01-01

    A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

  17. The NASA Computational Fluid Dynamics (CFD) program - Building technology to solve future challenges

    NASA Technical Reports Server (NTRS)

    Richardson, Pamela F.; Dwoyer, Douglas L.; Kutler, Paul; Povinelli, Louis A.

    1993-01-01

    This paper presents the NASA Computational Fluid Dynamics program in terms of a strategic vision and goals as well as NASA's financial commitment and personnel levels. The paper also identifies the CFD program customers and the support to those customers. In addition, the paper discusses technical emphasis and direction of the program and some recent achievements. NASA's Ames, Langley, and Lewis Research Centers are the research hubs of the CFD program while the NASA Headquarters Office of Aeronautics represents and advocates the program.

  18. NASA initiatives with historically black colleges and universities

    NASA Technical Reports Server (NTRS)

    1985-01-01

    NASA programs involving students and teachers at historically Black colleges and universities are discussed. The programs at each of the NASA research centers are described. Guidance is given on proposal submission for NASA grants. The Cooperative Education program, the Graduate Student Researchers program, and summer faculty fellowships are discussed.

  19. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Jeff Hanley, Constellation Program Manager, right, announces to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Hanley is joined by Scott J. Horowitz, NASA Associate Administrator for Exploration Systems and NASA Administrator Michael Griffin, left. Photo Credit: (NASA/Bill Ingalls)

  20. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    NASA Administrator Michael Griffin, left, announces to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. He is joined by Scott J. Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, right. Photo Credit: (NASA/Bill Ingalls)

  1. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Scott J. Horowitz, NASA Associate Administrator for Exploration Systems, center, announces to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Horowitz was joined by NASA Administrator Michael Griffin, left, and Jeff Hanley, Constellation Program Manager. Photo Credit: (NASA/Bill Ingalls)

  2. NASA's university program: Active grants and research contracts, fiscal year 1978

    NASA Technical Reports Server (NTRS)

    1978-01-01

    As basic policy NASA believes that colleges and universities should be encouraged to participate in the space and aeronautics program to the maximum extent practicable. The NASA objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA technical and scientific programs. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA University Program.

  3. NASA Alumni League Dialogue

    NASA Image and Video Library

    2011-03-04

    Former NASA Administrator James Beggs, left, and present NASA Administrator Charles Bolden conduct a dialogue on the future of the space program, Friday, March 4, 2011, at NASA Headquarters in Washington. Beggs was NASA's sixth administrator serving from July 1981 to December 1985. Bolden took over the post as NASA's 12th administrator in July 2009. The dialogue is part of the program “The State of the Agency: NASA Future Programs Presentation” sponsored by the NASA Alumni League with support from the AAS, AIAA, CSE and WIA.Photo Credit: (NASA/Paul E. Alers)

  4. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads,more » drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.« less

  5. University guide to NASA, 1993

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This guide provides brief descriptions of the two NASA Headquarters program offices through which NASA primarily funds universities, the Office of Space Science and Applications and the Office of Aeronautics and Space Technology. It also describes NASA's Office of Commercial Programs, which funds the Centers for the Commercial Development of Space and the Small Business Innovation Research Program. This guide explains the roles played by NASA's eight field centers and the Jet Propulsion Laboratory, and gives a sampling of ongoing NASA-wide educational programs and services. Most importantly, this guide provides practical information in the form of names and telephone numbers of NASA contacts.

  6. University guide to NASA, 1993

    NASA Astrophysics Data System (ADS)

    1992-10-01

    This guide provides brief descriptions of the two NASA Headquarters program offices through which NASA primarily funds universities, the Office of Space Science and Applications and the Office of Aeronautics and Space Technology. It also describes NASA's Office of Commercial Programs, which funds the Centers for the Commercial Development of Space and the Small Business Innovation Research Program. This guide explains the roles played by NASA's eight field centers and the Jet Propulsion Laboratory, and gives a sampling of ongoing NASA-wide educational programs and services. Most importantly, this guide provides practical information in the form of names and telephone numbers of NASA contacts.

  7. NASA university program management information system, FY 1985

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The University Program Report provides current information and related statistics for approximately 4200 grants/contracts/cooperative agreements active during the reporting period. NASA Field Centers and certain Headquarters Program Offices provide funds for those research and development activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-University relationship, frequently denoted, collectively, as NASA's University Program.

  8. NASA university program management information system, FY 1986

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The University Program Report provides current information and related statistics for approximately 4300 grants/contracts/cooperative agreements active during the report period. NASA Field centers and certain Headquarters Program Offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  9. NASA University Program Management Information System: FY 1995

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The University Program Report, Fiscal Year 1995, provides current information and related statistics for grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  10. NASA University program management information system, FY 1993

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The University Program Report, Fiscal Year 1993, provides current information and related statistics for 7682 grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  11. NASA university program management information system, FY 1994

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The University Program report, Fiscal Year 1994, provides current information and related statistics for 7841 grants/contracts/cooperative agreements active during the reporting period. NASA field centers and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  12. Constellation Program Press Conference

    NASA Image and Video Library

    2006-06-04

    NASA Administrator Michael Griffin, seated left, Scott Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, right, are seen during a press conference outlining specific center responsibilities associated with the Constellation Program for robotic and human moon and Mars exploration, Monday, June 5, 2006, at NASA Headquarters in Washington. Dean Acosta, NASA Deputy Assistant Administrator and Press Secretary, far left, moderates the program. Photo Credit (NASA/Bill Ingalls)

  13. Constellation Program Update

    NASA Image and Video Library

    2006-06-05

    Jeff Hanley, Constellation Program Manager, right, and Scott J. Horowitz, NASA Associate Administrator for Exploration Systems announce to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  14. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Scott J. Horowitz, NASA Associate Administrator for Exploration Systems, left, and Jeff Hanley, Constellation Program Manager, announce to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  15. Low cost program practices for future NASA space programs, volume 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The progress and outcomes of a NASA/HQ indepth analysis of NASA program practices are documented. Included is a survey of NASA and industry reaction to the utility and application of a Program Effects Relationship Handbook. The results and outcomes of all study tasks are presented as engineering memoranda as the appendix.

  16. Notification: EPA Enforcement of Superfund Orders and Agreements

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0215, May 10, 2018. The OIG plans to begin preliminary research on the EPA's enforcement of Superfund Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Response Settlements and Unilateral Response Orders.

  17. 76 FR 24481 - Notice of Two Proposed Agreements, a CERCLA Agreement and Order on Consent for Removal Action by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... Prospective Purchaser Agreement Related to Gasoline Service Stations' Underground Storage Tanks Currently...) gasoline service stations currently owned or leased by Caribbean Petroleum Corporation (``CPC'') and...

  18. 77 FR 59185 - Notice of Administrative Settlement Agreement for Recovery of Past Response Costs Pursuant to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... public comment. SUMMARY: In accordance with section 122(h) of the Comprehensive Environmental Response... 107(a) of CERCLA, against Stephen C. Browning (``Settling Party''). The Proposed Agreement would...

  19. Ground Water Technical Considerations during the Five-Year Review Process

    EPA Pesticide Factsheets

    This issue paper has been developed to highlight technical considerations as well as technical resources available to Remedial Project Managers (RPMs) in conducting Five-Year Reviews (FYRs) at CERCLA1 sites with contaminated groundwater.

  20. 40 CFR 300.170 - Federal agency participation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., RRT, and Area Committee organizational structure, and the NCP, RCPs and ACPs, described in § 300.210... facilities or vessels under their jurisdiction or control in accordance with section 103 of CERCLA. (d) All... control to the NRC. ...

  1. Changes to EPCRA, CERCLA, CAA 112(r) Consolidated List of Lists – March 2015

    EPA Pesticide Factsheets

    Changes include adding to the explanation for applying TPQs for EHS that are molten solids or solids in solution, reinstated TRI reporting requirements for hydrogen sulfide, and updated radionuclides list.

  2. 76 FR 77997 - Proposed CERCLA Administrative Cashout Settlement; The Atlantic Richfield Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... administrative settlement for recovery of past response costs concerning the Ophir Mills and Smelter Site in Tooele County, Utah with the Atlantic Richfield Company based upon a cash-out settlement. The settlement...

  3. Documents for SBAR Panel: CERCLA 108(b) Hard Rock Mining Financial Assurance Rule

    EPA Pesticide Factsheets

    SBAR panel documents for small business advocacy review panel on the financial responsibilities of the hard rock mining industry under Section 108(b) of the Comprehensive Environmental Response, Compensation, and Liability Act

  4. 76 FR 72921 - Proposed CERCLA Administrative Bona Fide Prospective Purchaser Settlement; The City of Dowagiac...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ... and projected future response costs concerning the ICG Castings, Inc., Dowagiac site in Dowagiac..., telephone: (312) 886-6235. Comments should reference the ICG Castings, Inc., Dowagiac site in Dowagiac...

  5. ProUCL version 4.00.05 Documentation Downloads

    EPA Pesticide Factsheets

    ProUCL 4.00.05 serves as a companion software package for Calculating Upper Confidence Limits for Exposure Point Concentrations at Hazardous Waste Sites and Guidance for Comparing Background and Chemical Concentrations in Soil for CERCLA Sites.

  6. SH Bell Consent Decree Entered

    EPA Pesticide Factsheets

    EPA complaint, Consent Decree, against S.H. Bell alleging that emissions of ambient manganese from its facility in East Liverpool, OH & in Ohioville, PA present an imminent and public health or welfare under CAA Sect. 303, CERCLA Sect. 106

  7. INVENTORY OF TREATABILITY STUDY VENDORS - VOLUME 1

    EPA Science Inventory

    The Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) amendments mandate the use of permanent solutions to the maximum extent practicable when remediating Superfund sites. Fundamental to achieving this goal is the use of treatment technologies that red...

  8. INVENTORY OF TREATABILITY STUDY VENDORS - VOLUME 2

    EPA Science Inventory

    The Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) amendments mandate the use of permanent solutions to the maximum extent practicable when remediating Superfund sites. Fundamental to achieving this goal is the use of treatment technologies that r...

  9. A NASA high-power space-based laser research and applications program

    NASA Technical Reports Server (NTRS)

    Deyoung, R. J.; Walberg, G. D.; Conway, E. J.; Jones, L. W.

    1983-01-01

    Applications of high power lasers are discussed which might fulfill the needs of NASA missions, and the technology characteristics of laser research programs are outlined. The status of the NASA programs or lasers, laser receivers, and laser propulsion is discussed, and recommendations are presented for a proposed expanded NASA program in these areas. Program elements that are critical are discussed in detail.

  10. Survey of university programs in remote sensing funded under grants from the NASA University-Space Applications program

    NASA Technical Reports Server (NTRS)

    Madigan, J. A.; Earhart, R. W.

    1978-01-01

    NASA's Office of Space and Terrestrial Applications (OSTA) is currently assessing approaches to transferring NASA technology to both the public and private sectors. As part of this assessment, NASA is evaluating the effectiveness of an ongoing program in remote sensing technology transfer conducted by 20 university contractors/grantees, each supported totally or partially by NASA funds. The University-Space Applications program has as its objective the demonstration of practical benefits from the use of remote sensing technology to a broad spectrum of new users, principally in state and local governments. To evaluate the University-Space Applications program, NASA has a near-term requirement for data on each university effort including total funding, funding sources, length of program, program description, and effectiveness measures.

  11. Summary of NASA Aerospace Flight Battery Systems Program activities

    NASA Technical Reports Server (NTRS)

    Manzo, Michelle; Odonnell, Patricia

    1994-01-01

    A summary of NASA Aerospace Flight Battery Systems Program Activities is presented. The NASA Aerospace Flight Battery Systems Program represents a unified NASA wide effort with the overall objective of providing NASA with the policy and posture which will increase the safety, performance, and reliability of space power systems. The specific objectives of the program are to: enhance cell/battery safety and reliability; maintain current battery technology; increase fundamental understanding of primary and secondary cells; provide a means to bring forth advanced technology for flight use; assist flight programs in minimizing battery technology related flight risks; and ensure that safe, reliable batteries are available for NASA's future missions.

  12. NASA/USRA University Advanced Design Program Fifth Annual Summer Conference

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The NASA/USRA University Advanced Design Program is a unique program that brings together NASA engineers, students, and faculty from United States engineering schools by integrating current and future NASA space/aeronautics engineering design projects into the university curriculum. The Program was conceived in the fall of 1984 as a pilot project to foster engineering design education in the universities and to supplement NASA's in-house efforts in advanced planning for space and aeronautics design. Nine universities and five NASA centers participated in the first year of the pilot project. Close cooperation between the NASA centers and the universities, the careful selection of design topics, and the enthusiasm of the students has resulted in a very successful program than now includes forty universities and eight NASA centers. The study topics cover a broad range of potential space and aeronautics projects.

  13. NASA's university program: Active grants and research contracts, fiscal year 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    NASA Field Centers and certain Headquarters Program Offices provide funds for those research and development activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  14. Constellation Program Press Conference

    NASA Image and Video Library

    2006-06-04

    Dean Acosta, NASA Deputy Assistant Administrator and Press Secretary, moderates a press conference with NASA Administrator Michael Griffin Scott Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, outlining specific center responsibilities associated with the Constellation Program for robotic and human Moon and Mars exploration, Monday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit (NASA/Bill Ingalls)

  15. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Jeff Hanley, Constellation Program Manager, announces to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  16. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Jeff Hanley, Constellation Program Manager, right, listens to a question during a NASA Update outlining responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  17. NASA's Astronomy Education Program: Reaching Diverse Audiences

    NASA Astrophysics Data System (ADS)

    Hasan, Hashima; Smith, Denise Anne; Hertz, Paul; Meinke, Bonnie

    2015-08-01

    An overview will be given of the rich programs developed by NASA to inject the science from it's Astrophysics missions into STEM activities targeted to diverse audiences. For example, Astro4Girls was started as a pilot program during IYA2009. This program partners NASA astrophysics education programs with public libraries to provide NASA-themed hands-on education activities for girls and their families, and has been executed across the country. School curricula and NASA websites have been translated in Spanish; Braille books have been developed for the visually impaired; programs have been developed for the hearing impaired. Special effort has been made to reach underrepresented minorities. Audiences include students, teachers, and the general public through formal and informal education settings, social media and other outlets. NASA Astrophysics education providers include teams embedded in its space flight missions; professionals selected though peer reviewed programs; as well as the Science Mission Directorate Astrophysics Education forum. Representative examples will be presented to demonstrate the reach of NASA education programs, as well as an evaluation of the effectiveness of these programs.

  18. KENNEDY SPACE CENTER, FLA. -- NASA and United Space Alliance (USA) Space Shuttle program managers attend a briefing, part of activities during a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC. Starting third from left are NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, USA Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Space Shuttle Program Manager William Parsons, and USA Associate Program Manager of Ground Operations Andy Allen.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- NASA and United Space Alliance (USA) Space Shuttle program managers attend a briefing, part of activities during a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC. Starting third from left are NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, USA Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Space Shuttle Program Manager William Parsons, and USA Associate Program Manager of Ground Operations Andy Allen.

  19. KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and a USA technician examine cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and a USA technician examine cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  20. Sharing NASA Science with Decision Makers: A Perspective from NASA's Applied Remote Sensing Training (ARSET) Program

    NASA Astrophysics Data System (ADS)

    Prados, A. I.; Blevins, B.; Hook, E.

    2015-12-01

    NASA ARSET http://arset.gsfc.nasa.gov has been providing applied remote sensing training since 2008. The goals of the program are to develop the technical and analytical skills necessary to utilize NASA resources for decision-support. The program has reached over 3500 participants, with 1600 stakeholders from 100 countries in 2015 alone. The target audience for the program are professionals engaged in environmental management in the public and private sectors, such as air quality forecasters, public utilities, water managers and non-governmental organizations engaged in conservation. Many program participants have little or no expertise in NASA remote sensing, and it's frequently their very first exposure to NASA's vast resources. One the key challenges for the program has been the evolution and refinement of its approach to communicating NASA data access, research, and ultimately its value to stakeholders. We discuss ARSET's best practices for sharing NASA science, which include 1) training ARSET staff and other NASA scientists on methods for science communication, 2) communicating the proper amount of scientific information at a level that is commensurate with the technical skills of program participants, 3) communicating the benefit of NASA resources to stakeholders, and 4) getting to know the audience and tailoring the message so that science information is conveyed within the context of agencies' unique environmental challenges.

  1. Environmental Geographic Information Systems (EGIS) at Stennis Space Center (SSC)

    NASA Technical Reports Server (NTRS)

    Carr, Hugh; Smoot, James; Parikh, Joy

    2004-01-01

    This viewgraph presentation includes: 1) Background of SSC Environmental GIS (EGIS); 2) Principal Center Activities; 3) SSC's GIS Applications: a) Environmental Emergency Response Tool, b) CERCLA, c) Facilities Master Planning, d) Natural Resource Management and Site Assessment.

  2. Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)

    EPA Pesticide Factsheets

    The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).

  3. EMERGENCY RESPONSE PROCEDURES FOR CONTROL OF HAZARDOUS SUBSTANCE RELEASES

    EPA Science Inventory

    Information is provided for selecting the best spill stabilization controls for hazardous substances regulated by the Comprehensive Enviromental Response, Compensation and Liability Act of 1980 (CERCLA). Information is also provided on the onsite assessment of spill severity, app...

  4. THE ROLE OF RISK ASSESSMENT IN ADDRESSING HAZARDOUS WASTE ISSUES

    EPA Science Inventory

    Risk assessment plays many important roles in addressing hazardous waste issues. In addition to providing a scientific framework and common health metric to evaluate risks. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or "Superfund") risk assessm...

  5. 40 CFR 305.26 - Prehearing conference.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Prehearing conference. 305.26 Section 305.26 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing...

  6. 40 CFR 305.26 - Prehearing conference.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Prehearing conference. 305.26 Section 305.26 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing...

  7. ENGINEERING BULLETIN: SELECTION OF CONTROL TECHNOLOGIES FOR REMEDIATION OF LEAD BATTERY RECYCLING SITES

    EPA Science Inventory

    Section 121(b) of the Comprehensive Environmental Response, Compensation, and Liability Act, (CERCLA) mandates the Environmental Protection Agency (EPA) to select remedies that "utilize permanent solutions and alternative treatment technologies or resource recovery technologies ...

  8. Laws and Executive Orders | Laws & Regulations | US EPA

    EPA Pesticide Factsheets

    2013-07-18

    Lists and links to descriptions of the major laws and executive orders that EPA administers and/or that guide EPA rulemakings, including the Clean Air Act, the Toxic Substance Control Act, CERCLA or Superfund, and the Clean Water Act.

  9. 77 FR 31611 - Proposed CERCLA Section 122(g)(4) Administrative Agreement and Order on Consent for the Mercury...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... and Recycle Technologies, Inc., American Lamp Recycling, LLC, Lighting Resources, LLC, Western Finger Lakes Solid Waste Management Authority, H-B Instrument Company, Inc. and H.J. Heinz Company (hereinafter...

  10. GUIDE TO CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOIL WASHING - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  11. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: AEROBIC BIODEGRADATION REMEDY SCREENING

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (KU FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and L...

  12. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOLVENT EXTRACTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation and Liabi...

  13. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: THERMAL DESORPTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  14. The Integration of the 241-Z Building Decontamination and Decommissioning Under Cercla with RCRA Closure at the Plutonium Finishing Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattlin, E.; Charboneau, S.; Johnston, G.

    2007-07-01

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less

  15. NASA/ASEE Summer Faculty Fellowship Program

    NASA Technical Reports Server (NTRS)

    Anderson, Loren A (Editor); Valdes, Carol (Editor)

    1992-01-01

    This document is a collection of technical reports on research conducted by the participants in the 1992 NASA/ASEE Summer Faculty Fellowship Program at Kennedy Space Center (KSC). This was the eighth year that a NASA/ASEE program has been conducted at KSC. The 1992 program was administered by the University of Central Florida in cooperation with KSC. The program was operated under the auspices of the American Society for Engineering Education (ASEE) with sponsorship and funding from the Office of Educational Affairs, NASA Headquarters, Washington, D.C. The KSC program was one of nine such Aeronautics and Space Research Programs funded by NASA Headquarters in 1992. The basic common objectives are to further the professional knowledge, to stimulate an exchange of ideas, to enrich and refresh the research and teaching activities, and to contribute to the research objectives of the NASA centers.

  16. NASA's Celebration of the International Year of Astronomy 2009

    NASA Astrophysics Data System (ADS)

    Hasan, Hashima; Smith, D.

    2010-01-01

    NASA celebrated the International Year of Astronomy (IYA) 2009 by developing a rich and vibrant educational and public outreach program that increased the exposure of the public and students to NASA discoveries reaching audiences far and wide. We kicked off the event at the American Astronomical Society meeting in January 2009, with a sneak preview of the multiwavelength image of M101, taken by the three NASA Great Observatories, Hubble Space Telescope, Chandra X-Ray Observatory, and Spitzer Space Telescope. There was a steady stream of visitors at the NASA booth at the Opening Ceremony in Paris. Since then NASA programs have touched the hearts and souls of the young and old both in the U.S. and internationally. NASA IYA programs in the form of teacher workshops, student contests, exhibits in libraries, museums, planetaria and non traditional venues such as airports and music festivals, podcasts and vodcasts have reached a wide audience. The NASA IYA Student Ambassadors engaged undergraduate and graduate students throughout the U.S. in outreach programs they created to spread NASA astronomy to their local communities. The year 2009 saw the launch of several space astronomy, heliophysics and planetary science missions. NASA developed IYA programs associated which each launch, to capitalize on the associated interest generated in the public. Some examples of the impact of these programs and building on their success beyond 2009 will be discussed in this talk. All NASA programs can be accessed via the website http://astronomy2009.nasa.gov/.

  17. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Dean Acosta, NASA Deputy Assistant Administrator and Press Secretary, left, moderates a NASA Update with NASA Administrator Michael Griffin, Scott J. Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, right, on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  18. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  19. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  20. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  1. 14 CFR 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  2. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  3. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  4. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  5. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  6. Mexican Space Agency and NASA Agreement

    NASA Image and Video Library

    2013-03-18

    Leland Melvin (right), NASA Associate Administrator for Education, along with the head of the Mexican Space Agency, Dr. Francisco Javier Mendieta Jimenez shake hands after signing a Reimbursable Space Act Agreement (RSAA) for a NASA International Internship Program as NASA Administrator Charles Bolden looks on, Monday, March 18, 2013 at NASA Headquarters in Washington. The International Internship Program is a pilot program developed at NASA which will provide and avenue for non-US students to come to NASA for an internship. US students will be paired with a foreign student to work on a NASA research project under the guidance of a mentor. This is the first NASA-Mexico agreement signed. Photo Credit: (NASA/Carla Cioffi)

  7. Mexican Space Agency and NASA Agreement

    NASA Image and Video Library

    2013-03-18

    Leland Melvin (right), NASA Associate Administrator for Education, along with the head of the Mexican Space Agency, Dr. Francisco Javier Mendieta Jimenez pose for a photo after signing a Reimbursable Space Act Agreement (RSAA) for a NASA International Internship Program as NASA Administrator Charles Bolden looks on, Monday, March 18, 2013 at NASA Headquarters in Washington. The International Internship Program is a pilot program developed at NASA which will provide and avenue for non-US students to come to NASA for an internship. US students will be paired with a foreign student to work on a NASA research project under the guidance of a mentor. This is the first NASA-Mexico agreement signed. Photo Credit: (NASA/Carla Cioffi)

  8. The NASA controls-structures interaction technology program

    NASA Technical Reports Server (NTRS)

    Newsom, Jerry R.; Layman, W. E.; Waites, H. B.; Hayduk, R. J.

    1990-01-01

    The interaction between a flexible spacecraft structure and its control system is commonly referred to as controls-structures interaction (CSI). The CSI technology program is developing the capability and confidence to integrate the structure and control system, so as to avoid interactions that cause problems and to exploit interactions to increase spacecraft capability. A NASA program has been initiated to advance CSI technology to a point where it can be used in spacecraft design for future missions. The CSI technology program is a multicenter program utilizing the resources of the NASA Langley Research Center (LaRC), the NASA Marshall Space Flight Center (MSFC), and the NASA Jet Propulsion Laboratory (JPL). The purpose is to describe the current activities, results to date, and future activities of the NASA CSI technology program.

  9. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    NASA Administrator Michael Griffin addresses NASA employees and members of the media about the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration during a NASA Update on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  10. Management of information in a research and development agency

    NASA Technical Reports Server (NTRS)

    Keene, Wallace O.

    1990-01-01

    The NASA program for managing scientific and technical information (STI) is examined, noting the technological, managerial, educational, and legal aspects of transferring and disseminating information. A definition of STI is introduced and NASA's STI-related management programs are outlined. Consideration is given to the role of STI management in NASA mission programs, research efforts supporting the management and use of STI, STI program interfaces, and the Automated Information Management Program to eliminate redundant automation efforts in common administrative functions. The infrastructure needed to manage the broad base of NASA information and the interfaces between NASA's STI management and external organizations are described.

  11. The NASA Electronic Parts and Packaging (NEPP) Program: Results and Direction

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.

    2007-01-01

    The NASA Electronic Parts and Packaging (NEPP) Program's mission is to provide guidance to NASA for the selection and application of microelectronic technologies, to improve understanding of the risks related to the use of these technologies in the space environment and to ensure that appropriate research is performed to meet NASA mission assurance needs. This viewgraph presentation reviews the NEPP program's goals and objectives, and reviews many of the missions that the NEPP program has impacted, both in and out of NASA. Also included are examples of the evaluation that the program performed.

  12. 14 CFR § 1201.400 - NASA procurement program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...

  13. 14 CFR 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Establishment of NASA Program Identifiers. 1221.105 Section 1221.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  14. 14 CFR 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Establishment of NASA Program Identifiers. 1221.105 Section 1221.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  15. 14 CFR 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Establishment of NASA Program Identifiers. 1221.105 Section 1221.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  16. 14 CFR 1221.105 - Establishment of NASA Program Identifiers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Establishment of NASA Program Identifiers. 1221.105 Section 1221.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA...

  17. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Dean Acosta, NASA Deputy Assistant Administrator and Press Secretary, left, moderates a NASA Update with NASA Administrator Michael Griffin, second from left, Scott J. Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, right, on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  18. SBIR/STTR Programs

    NASA Technical Reports Server (NTRS)

    Stegeman, James D.; Comstock, Douglas

    2008-01-01

    This presentation provides an overview of the NASA mission and overviews of both the Innovative Partnerships Program (IPP) and Small Business Innovation Research (SBIR) programs and how they relate to each other and to the NASA mission. Examples are provided concerning NASA technology needs and how the SBIR program has not only enabled technology development to meet those needs, but has also facilitated the infusion of that technology into the NASA mission.

  19. KSC-2013-1046

    NASA Image and Video Library

    2013-01-09

    CAPE CANAVERAL, Fla. -- At a news conference NASA officials and industry partners discuss progress of the agency's Commercial Crew Program CCP. Participating in the briefing, from the left are, Mike Curie, NASA Public Affairs, Ed Mango, NASA Commercial Crew Program manager, Phil McAlister, NASA Commercial Spaceflight Development director, Rob Meyerson, Blue Origin president and program manager, John Mulholland, The Boeing Company Commercial Programs Space Exploration vice president and program manager, Mark Sirangelo, Sierra Nevada Corp. vice president and SNC Space Systems chairman and Garrett Reisman, Space Exploration Technologies SpaceX Commercial Crew project manager. Through CCP, NASA is facilitating the development of U.S. commercial crew space transportation capabilities to achieve safe, reliable and cost-effective access to and from low-Earth orbit for potential future government and commercial customers. For more information, visit http://www.nasa.gov/commercialcrew Photo credit: NASA/Kim Shiflett

  20. SAMPLING-BASED APPROACH TO INVESTIGATING VAPOR INTRUSION

    EPA Science Inventory

    Vapor intrusion is defined as the migration of volatile organic compounds (VOCs) into occupied buildings from contaminated soil or ground water. EPA recently developed guidance to facilitate assessment of vapor intrusion at sites regulated by RCRA and CERCLA. The EPA guidance e...

  1. 76 FR 71342 - Proposed CERCLA Administrative Cost Recovery Settlement; River Forest Dry Cleaners Site, River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-17

    .... After EPA received an email from a concerned teacher, U.S. EPA conducted indoor air and sub-slab samples... indicate any level of contamination that warranted a removal action. The removal assessment was completed...

  2. 43 CFR 11.20 - Notification and detection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 11.20 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE... CERCLA requires prompt notification of Federal and State natural resource trustees of potential damages to natural resources under investigation and requires coordination of the assessments, investigations...

  3. 43 CFR 11.20 - Notification and detection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 11.20 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE... CERCLA requires prompt notification of Federal and State natural resource trustees of potential damages to natural resources under investigation and requires coordination of the assessments, investigations...

  4. 40 CFR 305.34 - Filing the transcript.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Filing the transcript. 305.34 Section 305.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  5. 40 CFR 305.34 - Filing the transcript.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Filing the transcript. 305.34 Section 305.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  6. 40 CFR 305.23 - Motions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Motions. 305.23 Section 305.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing Procedures § 305.23...

  7. 40 CFR 305.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND General § 305.3 Definitions... Liability Act of 1980 as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), 42 U.S...

  8. 40 CFR 305.10 - Appearances.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Appearances. 305.10 Section 305.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Parties and Appearances § 305...

  9. 40 CFR 305.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND General § 305.1 Scope. (a)(1... asserted against the Hazardous Substance Superfund (the Fund) pursuant to sections 111(a)(2) and 122(b)(1...

  10. 40 CFR 305.30 - Scheduling the hearing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  11. 40 CFR 305.11 - Consolidation and severance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Consolidation and severance. 305.11 Section 305.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Parties and...

  12. 40 CFR 305.10 - Appearances.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Appearances. 305.10 Section 305.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Parties and Appearances § 305...

  13. 40 CFR 305.31 - Evidence.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Evidence. 305.31 Section 305.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure § 305.31...

  14. 40 CFR 305.34 - Filing the transcript.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Filing the transcript. 305.34 Section 305.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  15. 40 CFR 305.31 - Evidence.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Evidence. 305.31 Section 305.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure § 305.31...

  16. 40 CFR 305.36 - Final order; costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Final order; costs. 305.36 Section 305.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  17. 40 CFR 305.36 - Final order; costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Final order; costs. 305.36 Section 305.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  18. 40 CFR 305.23 - Motions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Motions. 305.23 Section 305.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing Procedures § 305.23...

  19. 40 CFR 305.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND General § 305.1 Scope. (a)(1... asserted against the Hazardous Substance Superfund (the Fund) pursuant to sections 111(a)(2) and 122(b)(1...

  20. 40 CFR 305.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND General § 305.1 Scope. (a)(1... asserted against the Hazardous Substance Superfund (the Fund) pursuant to sections 111(a)(2) and 122(b)(1...

  1. 40 CFR 305.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND General § 305.3 Definitions... Liability Act of 1980 as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), 42 U.S...

  2. 40 CFR 305.30 - Scheduling the hearing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  3. 40 CFR 305.36 - Final order; costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Final order; costs. 305.36 Section 305.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  4. 40 CFR 305.10 - Appearances.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Appearances. 305.10 Section 305.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Parties and Appearances § 305...

  5. 40 CFR 305.30 - Scheduling the hearing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Scheduling the hearing. 305.30 Section 305.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure...

  6. 40 CFR 305.23 - Motions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Motions. 305.23 Section 305.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing Procedures § 305.23...

  7. 40 CFR 305.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND General § 305.3 Definitions... Liability Act of 1980 as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), 42 U.S...

  8. 40 CFR 305.31 - Evidence.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Evidence. 305.31 Section 305.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Hearing Procedure § 305.31...

  9. 40 CFR 305.11 - Consolidation and severance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Consolidation and severance. 305.11 Section 305.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Parties and...

  10. CHARACTERIZING SOILS FOR HAZAROUDS WASTE SITE ASSESSMENTS

    EPA Science Inventory

    The purpose of this paper is to provide guidance to Remedial Project Managers (RPM) and On-Scene Coordinators (OSC) concerning soil characterization data types required for decision-making in the CERCLA RI/FS process related to risk assessment and remedial alternative evaluation ...

  11. 75 FR 52942 - Two Proposed CERCLA Section 122(g) Administrative Agreements for De Minimis Settlements for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... settlement is between EPA and MG Automation and Controls Corporation (``MG'') and Occidental Chemical... accounts for, among other things, uncertainties associated with the costs of that future work at the Site...

  12. Anaconda Copper Mine, Yerington, NV; Proposed Settlement Agreement and Order on Consent

    EPA Pesticide Factsheets

    This notice announces the availability for review and comment of an administrative Settlement Agreement and Order on Consent under CERCLA between the EPA and Atlantic Richfield Company regarding the Anaconda Copper Mine Site in Yerington, Nevada.

  13. 77 FR 30282 - Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9674-9] Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act AGENCY: Environmental... the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42...

  14. 77 FR 67396 - Notice of Lodging of Proposed Consent Decree Under The Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... lawsuit entitled United States v. Index Sportsmen, Inc. (aka Index Sportsmen Club), Civil Action No. 12-1949. The United States filed this CERCLA lawsuit on behalf of the United States Forest Service. The...

  15. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  16. 76 FR 46355 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-02

    ... (Caltrans), pursuant to 23 USC 327, and Other Federal Agencies. SUMMARY: The FHWA, on behalf of Caltrans, is... (CERCLA) [42 USC 9601-9675]; Resource Conservation and Recovery Act of 1976 (RCRA) 11. E.O. 11988...

  17. 78 FR 20642 - Notice of Proposed CERCLA Agreement and Order on Consent for Removal Action by Bona Fide...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Fernando Valley Area 2 Superfund Site, Glendale Chromium Operable Unit, 264 W. Spazier Ave., Burbank... Site, Glendale Chromium Operable Unit, located at 264 W. Spazier Ave., Burbank, California. Under the...

  18. 40 CFR 300.400 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... unaltered form, or altered solely through naturally occurring processes or phenomena, from a location where... federal agency, and a state or political subdivision operating pursuant to a contract or cooperative... or political subdivision operating pursuant to a contract or cooperative agreement under CERCLA...

  19. Space agency notes 20th anniversary

    NASA Technical Reports Server (NTRS)

    Frosch, R. A.

    1978-01-01

    The twentieth anniversary of NASA is announced. A chronology of major milestones of the NASA program is given along with a brief outline of the programs and responsibilities of NASA Headquarters and the NASA centers and facilities. The NASA launch record is included.

  20. ThermoBuild: Online Method Made Available for Accessing NASA Glenn Thermodynamic Data

    NASA Technical Reports Server (NTRS)

    McBride, Bonnie; Zehe, Michael J.

    2004-01-01

    The new Web site program "ThermoBuild" allows users to easily access and use the NASA Glenn Thermodynamic Database of over 2000 solid, liquid, and gaseous species. A convenient periodic table allows users to "build" the molecules of interest and designate the temperature range over which thermodynamic functions are to be displayed. ThermoBuild also allows users to build custom databases for use with NASA's Chemical Equilibrium with Applications (CEA) program or other programs that require the NASA format for thermodynamic properties. The NASA Glenn Research Center has long been a leader in the compilation and dissemination of up-to-date thermodynamic data, primarily for use with the NASA CEA program, but increasingly for use with other computer programs.

  1. State of the states on brownfields programs for cleanup and reuse of contaminated sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Brownfields consist of land and/or buildings that are abandoned or underutilized where expansion or redevelopment is complicated, in part, because of the threat of known or potential contamination. Federal and state laws governing the treatment of these sites may require remediation (cleanup) of property before redevelopment and can contribute to uncertain liability for property owners or users. Congress, in considering the reauthorization of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as Superfund, is interested in the issue of brownfields and in their potential return to productive use. As a result, the House Subcommittee on Commerce, Trademore » and Hazardous Materials of the Committee on Commerce requested the Office of Technology Assessment (OTA) to prepare a background paper on issues surrounding cleanup and redevelopment of brownfields.« less

  2. NASA Hydrogen Research at Florida Universities, Program Year 2003

    NASA Technical Reports Server (NTRS)

    Block, David L.; Raissi, Ali

    2006-01-01

    This document presents the final report for the NASA Hydrogen Research at Florida Universities project for program year 2003. This multiyear hydrogen research program has positioned Florida to become a major player in future NASA space and space launch projects. The program is funded by grants from NASA Glenn Research Center with the objective of supporting NASA's hydrogen-related space, space launch and aeronautical research activities. The program conducts over 40 individual projects covering the areas of cryogenics, storage, production, sensors, fuel cells, power and education. At the agency side, this program is managed by NASA Glenn Research Center and at the university side, co-managed by FSEC and the University of Florida with research being conducted by FSEC and seven Florida universities: Florida International University, Florida State University, Florida A&M University, University of Central Florida, University of South Florida, University of West Florida and University of Florida. For detailed information, see the documents section of www.hydrogenresearch.org. This program has teamed these universities with the nation's premier space research center, NASA Glenn, and the nation's premier space launch facility, NASA Kennedy Space Center. It should be noted that the NASA Hydrogen Research at Florida Universities program has provided a shining example and a conduit for seven Florida universities within the SUS to work collaboratively to address a major problem of national interest, hydrogen energy and the future of energy supply in the U.S.

  3. 2002 NASA Seal/Secondary Air System Workshop. Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)

    2003-01-01

    The 2002 NASA Seal/Secondary Air System Workshop covered the following topics: (i) Overview of NASA s perspective of aeronautics and space technology for the 21st century; (ii) Overview of the NASA-sponsored Ultra-Efficient Engine Technology (UEET), Turbine-Based Combined-Cycle (TBCC), and Revolutionary Turbine Accelator (RTA) programs; (iii) Overview of NASA Glenn's seal program aimed at developing advanced seals for NASA's turbomachinery, space propulsion, and reentry vehicle needs; (iv) Reviews of sealing concepts, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. The NASA UEET and TBCC/RTA program overviews illustrated for the reader the importance of advanced technologies, including seals, in meeting future turbine engine system efficiency and emission goals. For example, the NASA UEET program goals include an 8- to 15-percent reduction in fuel burn, a 15-percent reduction in CO2, a 70-percent reduction in NOx, CO, and unburned hydrocarbons, and a 30-dB noise reduction relative to program baselines. The workshop also covered several programs NASA is funding to investigate advanced reusable space vehicle technologies (X-38) and advanced space ram/scramjet propulsion systems. Seal challenges posed by these advanced systems include high-temperature operation, resiliency at the operating temperature to accommodate sidewall flexing, and durability to last many missions.

  4. NASA's Optical Communications Program for 2015 and Beyond

    NASA Technical Reports Server (NTRS)

    Cornwell, Donald M.

    2015-01-01

    NASA's Space Communications and Navigation (SCaN) program at NASA headquarters is pursuing a vibrant and wide-ranging optical communications program for further planetary and near-Earth missions following the spectacular success of NASA's Lunar Laser Communication Demonstration (LLCD) from the Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft orbiting the moon in 2013. This invited paper will discuss NASA's new laser communication missions, key scenarios and details, and the plans to infuse this new technology into NASA's existing communications networks.

  5. 2004 NASA Seal/Secondary Air System Workshop, Volume 1

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The 2004 NASA Seal/Secondary Air System workshop covered the following topics: (1) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (2) Overview of the NASA-sponsored Ultra-Efficient Engine Technology (UEET) program; (3) Overview of NASA Glenn s seal program aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (4) Reviews of NASA prime contractor and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (5) Reviews of material development programs relevant to advanced seals development. The NASA UEET overview illustrated for the reader the importance of advanced technologies, including seals, in meeting future turbine engine system efficiency and emission goals. For example, the NASA UEET program goals include an 8- to 15-percent reduction in fuel burn, a 15-percent reduction in CO2, a 70-percent reduction in NOx, CO, and unburned hydrocarbons, and a 30-dB noise reduction relative to program baselines. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle, as part of NASA s new Exploration Initiative. Plans to develop the necessary mechanism and androgynous seal technologies were reviewed. Seal challenges posed by reusable re-entry space vehicles include high-temperature operation, resiliency at temperature to accommodate gap changes during operation, and durability to meet mission requirements.

  6. NASA Geodynamics Program

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Activities and achievements for the period of May 1983 to May 1984 for the NASA geodynamics program are summarized. Abstracts of papers presented at the Conference are inlcuded. Current publications associated with the NASA Geodynamics Program are listed.

  7. The NASA Scientific and Technical Information Program: Exploring challenges, creating opportunities

    NASA Technical Reports Server (NTRS)

    Sepic, Ronald P.

    1993-01-01

    The NASA Scientific and Technical Information (STI) Program offers researchers access to the world's largest collection of aerospace information. An overview of Program activities, products and services, and new directions is presented. The R&D information cycle is outlined and specific examples of the NASA STI Program in practice are given. Domestic and international operations and technology transfer activities are reviewed and an agenda for the STI Program NASA-wide is presented. Finally, the incorporation of Total Quality Management and evaluation metrics into the STI Program is discussed.

  8. KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician briefs NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, USA Vice President and Space Shuttle Program Manager Howard DeCastro, and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik on the use of cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician briefs NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, USA Vice President and Space Shuttle Program Manager Howard DeCastro, and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik on the use of cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  9. KSC-2011-6950

    NASA Image and Video Library

    2011-09-13

    CAPE CANAVERAL, Fla. -- NASA and Alliant Techsystems (ATK) managers announce an agreement that could accelerate the availability of U.S. commercial crew transportation capabilities in the Press Site auditorium at NASA's Kennedy Space Center in Florida. From left are Candrea Thomas, NASA Public Affairs; Ed Mango, Commercial Crew Program manager, NASA; Kent Rominger, vice president, Strategy and Business Development, ATK Aerospace; and John Schumacher, vice president, Space Programs, EADS North America. The unfunded Space Act Agreement (SAA) through NASA's Commercial Crew Program will allow the agency and ATK to review and discuss Liberty system requirements, safety and certification plans, computational models of rocket stage performance, and avionics architecture designs. The agreement outlines key milestones including an Initial System Design review, during which ATK will present to NASA officials the Liberty systems level requirements, preliminary design, and certification process development. For more information about NASA's Commercial Crew Program, visit http://www.nasa.gov/exploration/commercial. Photo credit: NASA/Jim Grossmann

  10. Science and Science Education Go Hand-in-Hand: The Impact of the NASA Science Mission Directorate Education and Public Outreach Program

    NASA Astrophysics Data System (ADS)

    Smith, D. A.; Peticolas, L.; Schwerin, T.; Shipp, S.; Manning, J. G.

    2014-07-01

    For nearly two decades, NASA has embedded education and public outreach (EPO) in its Earth and space science missions and research programs on the principle that science education is most effective when educators and scientists work hand-in-hand. Four Science EPO Forums organize the respective NASA Science Mission Directorate (SMD) Astrophysics, Earth Science, Heliophysics, and Planetary Science EPO programs into a coordinated, efficient, and effective nationwide effort. The NASA SMD EPO program evaluates EPO impacts that support NASA's policy of providing a direct return-on-investment for the American public, advances STEM education and literacy, and enables students and educators to participate in the practice of science as embodied in the 2013 Next Generation Science Standards. Leads of the four NASA SMD Science EPO Forums provided big-picture perspectives on NASA's effort to incorporate authentic science into the nation's STEM education and scientific literacy, highlighting examples of program effectiveness and impact. Attendees gained an increased awareness of the depth and breadth of NASA SMD's EPO programs and achievements, the magnitude of its impacts through representative examples, and the ways current and future EPO programs can build upon the work being done.

  11. Planning an Effective Speakers Outreach Program

    NASA Technical Reports Server (NTRS)

    McDonald, Malcolm W.

    1996-01-01

    The National Aeronautics and Space Administration (NASA) and, in particular, the Marshall Space Flight Center (MSFC) have played pivotal roles in the advancement of space exploration and space-related science and discovery since the early 1960's. Many of the extraordinary accomplishments and advancements of NASA and MSFC have gone largely unheralded to the general public, though they often border on the miraculous. This lack of suitable and deserved announcement of these "miracles" seems to have occurred because NASA engineers and scientists are inclined to regard extraordinary accomplishment as a normal course of events. The goal in this project has been to determine an effective structure and mechanism for communicating to the general public the extent to which our investment in our US civilian space program, NASA, is, in fact, a very wise investment. The project has involved discerning important messages of truth which beg to be conveyed to the public. It also sought to identify MSFC personnel who are particularly effective as messengers or communicators. A third aspect of the project was to identify particular target audiences who would appreciate knowing the facts about their NASA investment. The intent is to incorporate the results into the formation of an effective, proactive MSFC speakers bureau. A corollary accomplishment for the summer was participation in the formation of an educational outreach program known as Nasa Ambassadors. Nasa Ambassadors are chosen from the participants in the various MSFC summer programs including: Summer Faculty Fellowship Program (SFFP), Science Teacher Enrichment Program (STEP), Community College Enrichment Program (CCEP), Joint Venture (JOVE) program, and the NASA Academy program. NASA Ambassadors agree to make pre-packaged NASA-related presentations to non-academic audiences in their home communities. The packaged presentations were created by a small cadre of participants from the 1996 MSFC summer programs, volunteering their time beyond their normal NASA summer research commitment. A total of eight presentations were created and made available for use by NASA Ambassadors. A major segment of the research effort during the summer has been devoted to verifying and documenting certain "spinoff' contributions of NASA technology and in determining their relevance and impact to our society and our nation's economy. The purpose behind the verification/documentation research has been to shed light on the question of whether or not our NASA investment is a wise investment. It has revealed that NASA is a wise investment.

  12. NASA pyrotechnically actuated systems program

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1993-01-01

    The Office of Safety and Mission Quality initiated a Pyrotechnically Actuated Systems (PAS) Program in FY-92 to address problems experienced with pyrotechnically actuated systems and devices used both on the ground and in flight. The PAS Program will provide the technical basis for NASA's projects to incorporate new technological developments in operational systems. The program will accomplish that objective by developing/testing current and new hardware designs for flight applications and by providing a pyrotechnic data base. This marks the first applied pyrotechnic technology program funded by NASA to address pyrotechnic issues. The PAS Program has been structured to address the results of a survey of pyrotechnic device and system problems with the goal of alleviating or minimizing their risks. Major program initiatives include the development of a Laser Initiated Ordnance System, a pyrotechnic systems data base, NASA Standard Initiator model, a NASA Standard Linear Separation System and a NASA Standard Gas Generator. The PAS Program sponsors annual aerospace pyrotechnic systems workshops.

  13. Government-Industry Data Exchange Program (GIDEP) and NASA Advisories

    NASA Technical Reports Server (NTRS)

    Sampson, Michael J.

    2010-01-01

    This viewgraph presentation reviews the Government-Industry Data Exchange Program (GIDEP) and NASA Advisories policy to practice. The contents include: 1) Purpose of the Government-Industry Data Exchange Program (GIDEP); 2) NASA and GSFC Documentation; 3) NASA Advisories, differences from GIDEP; 4) GIDEP Distribution by Originator; 5) New Interim GIDEP Policy for Suspect Counterfeits; 6) NASA and Suspect Counterfeits; 7) Threats to GIDEP; and 8) Conclusions and Contact Information.

  14. The NASA Electronic Parts and Packaging (NEPP) Program: Overview and Update FY15 and Beyond

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Sampson, Michael J.

    2016-01-01

    The NASA Electronic Parts and Packaging (NEPP) program, and its subset the NASA Electronic Parts Assurance Group (NEPAG), are NASA's point-of-contacts for reliability and radiation tolerance of electrical, electronic, and electromechanical (EEE) parts and their packages. This presentation includes a Fiscal Year 2015 program overview.

  15. Constellation Program Press Conference

    NASA Image and Video Library

    2006-06-04

    NASA Administrator Michael Griffin, left, Scott Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, right, are seen during a press conference outlining specific center responsibilities associated with the Constellation Program for robotic and human Moon and Mars exploration, Monday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit (NASA/Bill Ingalls)

  16. Constellation Program Press Conference

    NASA Image and Video Library

    2006-06-04

    Members of the media listen during a press conference with NASA Administrator Michael Griffin, Scott Horowitz, NASA Associate Administrator for Exploration Systems and Jeff Hanley, Constellation Program Manager, outlining specific center responsibilities associated with the Constellation Program for robotic and human Moon and Mars exploration, Monday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit (NASA/Bill Ingalls)

  17. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  18. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  19. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  20. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  1. 48 CFR 1819.7203 - Mentor approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... by NASA OSBP. (f) A template of the mentor application is available at: http://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  2. NASA HUNCH Hardware

    NASA Technical Reports Server (NTRS)

    Hall, Nancy R.; Wagner, James; Phelps, Amanda

    2014-01-01

    What is NASA HUNCH? High School Students United with NASA to Create Hardware-HUNCH is an instructional partnership between NASA and educational institutions. This partnership benefits both NASA and students. NASA receives cost-effective hardware and soft goods, while students receive real-world hands-on experiences. The 2014-2015 was the 12th year of the HUNCH Program. NASA Glenn Research Center joined the program that already included the NASA Johnson Space Flight Center, Marshall Space Flight Center, Langley Research Center and Goddard Space Flight Center. The program included 76 schools in 24 states and NASA Glenn worked with the following five schools in the HUNCH Build to Print Hardware Program: Medina Career Center, Medina, OH; Cattaraugus Allegheny-BOCES, Olean, NY; Orleans Niagara-BOCES, Medina, NY; Apollo Career Center, Lima, OH; Romeo Engineering and Tech Center, Washington, MI. The schools built various parts of an International Space Station (ISS) middeck stowage locker and learned about manufacturing process and how best to build these components to NASA specifications. For the 2015-2016 school year the schools will be part of a larger group of schools building flight hardware consisting of 20 ISS middeck stowage lockers for the ISS Program. The HUNCH Program consists of: Build to Print Hardware; Build to Print Soft Goods; Design and Prototyping; Culinary Challenge; Implementation: Web Page and Video Production.

  3. The NASA Astrophysics Program

    NASA Technical Reports Server (NTRS)

    Zebulum, Ricardo S.

    2011-01-01

    NASA's scientists are enjoying unprecedented access to astronomy data from space, both from missions launched and operated only by NASA, as well as missions led by other space agencies to which NASA contributed instruments or technology. This paper describes the NASA astrophysics program for the next decade, including NASA's response to the ASTRO2010 Decadal Survey.

  4. 14 CFR 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Other applicable NASA regulations. 1203.101... PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part, “Delegation of..., “NASA Information Security Program Committee.” (c) NASA Handbook 1620.3, “NASA Physical Security...

  5. 14 CFR 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Other applicable NASA regulations. 1203.101... PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part, “Delegation of..., “NASA Information Security Program Committee.” (c) NASA Handbook 1620.3, “NASA Physical Security...

  6. 14 CFR 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Other applicable NASA regulations. 1203.101... PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part, “Delegation of..., “NASA Information Security Program Committee.” (c) NASA Handbook 1620.3, “NASA Physical Security...

  7. 14 CFR 1203.101 - Other applicable NASA regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Other applicable NASA regulations. 1203.101... PROGRAM Scope § 1203.101 Other applicable NASA regulations. (a) Subpart H of this part, “Delegation of..., “NASA Information Security Program Committee.” (c) NASA Handbook 1620.3, “NASA Physical Security...

  8. 14 CFR 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Use of the NASA Program Identifiers. 1221.112 Section 1221.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype...

  9. 14 CFR 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Use of the NASA Program Identifiers. 1221.112 Section 1221.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype...

  10. 14 CFR 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Use of the NASA Program Identifiers. 1221.112 Section 1221.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype...

  11. 14 CFR 1221.112 - Use of the NASA Program Identifiers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Use of the NASA Program Identifiers. 1221.112 Section 1221.112 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION THE NASA SEAL AND OTHER DEVICES, AND THE CONGRESSIONAL SPACE MEDAL OF HONOR NASA Seal, NASA Insignia, NASA Logotype...

  12. Disseminating NASA-based science through NASA's Universe of Learning: Girls STEAM Ahead

    NASA Astrophysics Data System (ADS)

    Marcucci, E.; Meinke, B. K.; Smith, D. A.; Ryer, H.; Slivinski, C.; Kenney, J.; Arcand, K.; Cominsky, L.

    2017-12-01

    The Girls STEAM Ahead with NASA (GSAWN) initiative partners the NASA's Universe of Learning (UoL) resources with public libraries to provide NASA-themed activities for girls and their families. The program expands upon the legacy program, NASA Science4Girls and Their Families, in celebration of National Women's History Month. Program resources include hands-on activities for engaging girls, such as coding experiences and use of remote telescopes, complementary exhibits, and professional development for library partner staff. The science-institute-embedded partners in NASA's UoL are uniquely poised to foster collaboration between scientists with content expertise and educators with pedagogy expertise. The thematic topics related to NASA Astrophysics enable audiences to experience the full range of NASA scientific and technical disciplines and the different career skills each requires. For example, an activity may focus on understanding exoplanets, methods of their detection, and characteristics that can be determined remotely. The events focus on engaging underserved and underrepresented audiences in Science, Technology, Engineering, and Mathematics (STEM) via use of research-based best practices, collaborations with libraries, partnerships with local and national organizations (e.g. National Girls Collaborative Project or NGCP), and remote engagement of audiences. NASA's UoL collaborated with another NASA STEM Activation partner, NASA@ My Library, to announce GSAWN to their extensive STAR_Net network of libraries. This partnership between NASA SMD-funded Science learning and literacy teams has included NASA@ My Library hosting a professional development webinar featuring a GSAWN activity, a newsletter and blog post about the program, and plans for future exhibit development. This presentation will provide an overview of the program's progress to engage girls and their families through the development and dissemination of NASA-based science programming.

  13. Indexing NASA programs for technology transfer methods development and feasibility

    NASA Technical Reports Server (NTRS)

    Clingman, W. H.

    1972-01-01

    This project was undertaken to evaluate the application of a previously developed indexing methodology to ongoing NASA programs. These programs are comprehended by the NASA Program Approval Documents (PADS). Each PAD contains a technical plan for the area it covers. It was proposed that these could be used to generate an index to the complete NASA program. To test this hypothesis two PADS were selected by the NASA Technology Utilization Office for trial indexing. Twenty-five individuals indexed the two PADS using NASA Thesaurus terms. The results demonstrated the feasibility of indexing ongoing NASA programs using PADS as the source of information. The same indexing methodology could be applied to other documents containing a brief description of the technical plan. Results of this project showed that over 85% of the concepts in the technology should be covered by the indexing. Also over 85% of the descriptors chosen would be accurate. This completeness and accuracy for the indexing is considered satisfactory for application in technology transfer.

  14. Development of an Outreach Program for NASA: "NASA Ambassadors"

    NASA Technical Reports Server (NTRS)

    Lebo, George

    1998-01-01

    The NASA Ambassadors Program is designed to present the excitement and importance of NASA's programs to its customers, the general public. Those customers, which are identified in the "Science Communications Strategy" developed by the Space Sciences Laboratory at the MSFC, are divided into three categories: (1) Not interested and not knowledgeable; (2) Interested but not knowledgeable; and (3) Science attentive. In it they recognize that it makes the most sense to attempt to communicate with those described in the last two categories. However, their plan suggests that the media and the educational institutions are the only means of outreach. The NASA Ambassadors Program allows NASA to reach its target audience directly. Steps to be taken in order for the program to commence: (1) MSFC chooses to support the NASA Ambassadors Program - decision point; (2) Designate an "Office In Charge". (3) Assign the "Operation" phase to in-house MSFC personnel or to a contractor - decision point; (4) Name a point of contact; (5) Identify partners in the program and enlist their assistance; (6) Process an unsolicited proposal from an outside source to accomplish those tasks which MSFC chooses to out-source.

  15. The repository-based software engineering program: Redefining AdaNET as a mainstream NASA source

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Repository-based Software Engineering Program (RBSE) is described to inform and update senior NASA managers about the program. Background and historical perspective on software reuse and RBSE for NASA managers who may not be familiar with these topics are provided. The paper draws upon and updates information from the RBSE Concept Document, baselined by NASA Headquarters, Johnson Space Center, and the University of Houston - Clear Lake in April 1992. Several of NASA's software problems and what RBSE is now doing to address those problems are described. Also, next steps to be taken to derive greater benefit from this Congressionally-mandated program are provided. The section on next steps describes the need to work closely with other NASA software quality, technology transfer, and reuse activities and focuses on goals and objectives relative to this need. RBSE's role within NASA is addressed; however, there is also the potential for systematic transfer of technology outside of NASA in later stages of the RBSE program. This technology transfer is discussed briefly.

  16. 77 FR 38802 - Proposed CERCLA Administrative Cost Recovery Settlement; Standex International Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Settlement; Standex International Corporation AGENCY: Environmental Protection Agency. ACTION: Notice; request for public comment. SUMMARY: Notice is hereby given of a proposed administrative settlement for... following settling party: Standex International Corporation. The settlement requires the settling party to...

  17. 76 FR 29781 - Notice of Submission of Proposed Information Collection to OMB; Emergency Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... involvement and integrate housing, land use, land cleanup and preparation for reuse, economic and workforce... authorized in the Clean Air Act Section 103(b)(2), Clean Water Act Section 104(b)(2), and CERCLA Section 104...

  18. EPA's Notification of Rules and Regulations Regarding the Demolition of Asbestos-Containing Structures, and Related Questions and Answers

    EPA Pesticide Factsheets

    Memorandum from EPA Deputy Administrator to Assistant Administrators and Regional Administrators and attachment communicating NESHAP, CERCLA, TSCA, OSHA requirements sent recommendation of the Inspector General in Report No. 1 2-P-01 25.

  19. 40 CFR 35.4270 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... complies with the “National Contingency Plan” (NCP) and the statutory requirements of CERCLA. Federal... include in-kind as well as cash contributions. National Contingency Plan (NCP) means the federal government's blueprint for responding to both oil spills and hazardous substance releases. It lays out the...

  20. 40 CFR 305.24 - Default order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Default order. 305.24 Section 305.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing Procedures § 305.24...

  1. 40 CFR 305.20 - Request for a hearing; contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Request for a hearing; contents. 305.20 Section 305.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  2. 40 CFR 305.24 - Default order.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Default order. 305.24 Section 305.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing Procedures § 305.24...

  3. 40 CFR 305.27 - Accelerated order, order to dismiss.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Accelerated order, order to dismiss. 305.27 Section 305.27 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  4. 40 CFR 305.20 - Request for a hearing; contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Request for a hearing; contents. 305.20 Section 305.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  5. 40 CFR 305.27 - Accelerated order, order to dismiss.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Accelerated order, order to dismiss. 305.27 Section 305.27 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  6. 40 CFR 305.27 - Accelerated order, order to dismiss.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Accelerated order, order to dismiss. 305.27 Section 305.27 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  7. 40 CFR 305.20 - Request for a hearing; contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Request for a hearing; contents. 305.20 Section 305.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  8. 40 CFR 305.24 - Default order.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Default order. 305.24 Section 305.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND... (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing Procedures § 305.24...

  9. 76 FR 1154 - Operating Industries, Inc., Superfund Site, Monterey Park, CA; Notice of Proposed CERCLA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... Electric Company, as successor by merger to Reliance Electric Company (fka Reliance Electric Industrial... Car Wash General Partnership, Bimbo Bakeries USA, Inc., Bimbo Foods, Inc., successor-in-interest to... Supply, LLC, L-3 Services, [[Page 1156

  10. 77 FR 64353 - Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ..., Compensation, and Liability Act of 1980, 42 U.S.C. 9607, (``CERCLA''), to recover past response costs incurred....usdoj.gov/enrd/Consent_Decrees.html . We will provide a paper copy of the consent decree upon written...

  11. 77 FR 65205 - Amended Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ..., Compensation, and Liability Act of 1980, 42 U.S.C. 9607, (``CERCLA''), to recover past response costs incurred... site: http://www.usdoj.gov/enrd/Consent_Decrees.html . We will provide a paper copy of the consent...

  12. 77 FR 58989 - Proposed CERCLA Administrative Cost Recovery Settlement for the Buckbee-Mears Co. Superfund Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ...); (2) Twenty-five percent of any funds the Bank collects from the principals of International Electron... paid $150,000 attributable to the costs of marketing and selling the Properties; (b) The Bank will pay...

  13. 75 FR 74053 - Availability of Final Toxicological Profiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... priority hazardous substances comprising the twenty-first set prepared by ATSDR. FOR FURTHER INFORMATION... final toxicological profiles of priority hazardous substances comprising the twenty-first set prepared... that are most commonly found at facilities on the CERCLA National Priorities List (NPL). Among these...

  14. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  15. National Aeronautics and Space Administration: 1998 Accountability Report

    NASA Technical Reports Server (NTRS)

    1999-01-01

    This Accountability Report summarizes NASA's program accomplishments and its stewardship over budget and financial resources. The report is the culmination of NASA's management process, which begins with mission definition and program planning, continues with formulation and justification of NASA's budgets for the President and Congress, and ends with NASA scientific and engineering program accomplishments. This report covers NASA's activities from October 1, 1997, through September 30, 1998, with discussion of some subsequent events.

  16. Summer of Innovation Kick Off

    NASA Image and Video Library

    2010-06-09

    NASA Administrator Charles Bolden, center, listens as NASA astronaut Leland Melvin welcomes teachers and middle school students to the kick off of NASA's Summer of Innovation program at the Jet Propulsion Laboratory in Pasadena, Calif., Thursday, June 10, 2010. Through the program, NASA will engage thousands of middle school students and teachers in stimulating math and science-based education programs with the goal of increasing the number of future scientists, mathematicians, and engineers. Photo Credit: (NASA/Bill Ingalls)

  17. Evaluating the Effectiveness of the 1999-2000 NASA CONNECT Program

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Frank, Kari Lou

    2002-01-01

    NASA CONNECT is a standards-based, integrated mathematics, science, and technology series of 30-minute instructional distance learning (satellite and television) programs for students in grades 6-8. Each of the five programs in the 1999-2000 NASA CONNECT series included a lesson, an educator guide, a student activity or experiment, and a web-based component. In March 2000, a mail (self-reported) survey (booklet) was sent to a randomly selected sample of 1,000 NASA CONNECT registrants. A total of 336 surveys (269 usable) were received by the established cut-off date. Most survey questions employed a 5-point Likert-type response scale. Survey topics included (1) instructional technology and teaching, (2) instructional programming and technology in the classroom, (3) the NASA CONNECT program, (4) classroom use of computer technology, and (5) demographics. About 73% of the respondents were female, about 92% identified "classroom teacher" as their present professional duty, about 90% worked in a public school, and about 62% held a master's degree or master's equivalency. Regarding NASA CONNECT, respondents reported that (1) they used the five programs in the 1999-2000 NASA CONNECT series; (2) the stated objectives for each program were met (4.54); (3) the programs were aligned with the national mathematics, science, and technology standards (4.57); (4) program content was developmentally appropriate for grade level (4.17); and (5) the programs in the 1999-2000 NASA CONNECT series enhanced/enriched the teaching of mathematics, science, and technology (4.51).

  18. Evaluating the Effectiveness of the 1998-1999 NASA CONNECT Program

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Frank, Kari Lou; House, Patricia L.

    2000-01-01

    NASA CONNECT is a standards-based, integrated mathematics, science, and technology series of 30-minute instructional distance learning (satellite and television) programs for students in grades 5-8. Each of the five programs in the 1998-1999 NASA CONNECT series included a lesson, an educator guide, a student activity or experiment, and a web-based component. In March 1999, a mail (self-reported) survey (booklet) was sent to a randomly selected sample of 1,000 NASA CONNECT registrants. A total of 401 surveys (351 usable) were received by the established cut-off date. Most survey questions employed a 5-point Likert-type response scale. Survey topics included: (1) instructional technology and teaching, (2) instructional programming and technology in the classroom, (3) the NASA CONNECT program, (4) classroom use of computer technology, and (5) demographics. About 68% of the respondents were female, about 88% identified "classroom teacher" as their present professional duty, about 75% worked in a public school, and about 67% held a master's degree or master's equivalency. Regarding NASA CONNECT, respondents reported that: (1) they used the five programs in the 1998-1999 NASA CONNECT series; (2) the stated objectives for each program were met (4.49); (3) the programs were aligned with the national mathematics, science, and technology standards (4.61); (4) program content was developmentally appropriate for grade level (4.25); and (5) the programs in the 1998-1999 NASA CONNECT series enhanced/enriched the teaching of mathematics, science, and technology (4.45).

  19. The NASA Geodynamics Program: An overview

    NASA Technical Reports Server (NTRS)

    1983-01-01

    This NASA Geodynamics Program overview collectively examines the history, scientific basis, status, and results of the NASA Program and outlines plans for the next five to eight years. It is intended as an informative nontechnical discussion of geodynamics research.

  20. National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program 1988, volume 1

    NASA Technical Reports Server (NTRS)

    Bannerot, Richard B. (Editor); Goldstein, Stanley H. (Editor)

    1989-01-01

    The 1988 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by the University of Houston and JSC. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began in 1965 at JSC and in 1964 nationally, are (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objectives of the NASA Centers.

  1. KENNEDY SPACE CENTER, FLA. -- From front row left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons are trained on the proper use of the Emergency Life Support Apparatus (ELSA). NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From front row left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons are trained on the proper use of the Emergency Life Support Apparatus (ELSA). NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  2. KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons each don an Emergency Life Support Apparatus (ELSA) during training on the proper use of the escape devices. NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons each don an Emergency Life Support Apparatus (ELSA) during training on the proper use of the escape devices. NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  3. KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, United Space Alliance (USA) Director of Orbiter Operations Patty Stratton, and NASA Space Shuttle Program Manager William Parsons view the underside of Shuttle Discovery in Orbiter Processing Facility Bay 3. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, United Space Alliance (USA) Director of Orbiter Operations Patty Stratton, and NASA Space Shuttle Program Manager William Parsons view the underside of Shuttle Discovery in Orbiter Processing Facility Bay 3. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  4. National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1989, volume 1

    NASA Technical Reports Server (NTRS)

    Jones, William B., Jr. (Editor); Goldstein, Stanley H. (Editor)

    1989-01-01

    The 1989 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by Texas A and M University and JSC. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began nationally in 1964 and at JSC in 1965, are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objective of the NASA Centers.

  5. National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program 1988, volume 2

    NASA Technical Reports Server (NTRS)

    Bannerot, Richard B.; Goldstein, Stanley H.

    1989-01-01

    The 1988 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by the University of Houston and JCS. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began in 1965 at JSC and in 1964 nationally, are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objectives of the NASA Centers.

  6. National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1989, volume 2

    NASA Technical Reports Server (NTRS)

    Jones, William B., Jr. (Editor); Goldstein, Stanley H. (Editor)

    1989-01-01

    The 1989 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by Texas A and M University and JSC. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began nationally in 1964 and at JSC in 1965, are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objective of the NASA Centers.

  7. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  8. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Scott J. Horowitz, NASA Associate Administrator for Exploration Systems, announces to NASA employees and members of the media the responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  9. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documentsmore » the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.« less

  10. NASA's Space Science Programming Possibilities for Planetaria

    NASA Technical Reports Server (NTRS)

    Adams, M. L.

    2003-01-01

    The relationship between NASA and the planetarium community is an important one. Indeed, NASA's Office of Space Science has invested in a study of the Space Science Media Needs of Science Center Professionals. Some of the findings indicate a need for exposure to space science researchers, workshops for museum educators, 'canned' programs, and access to a speakers bureau. We will discuss some of the programs of NASA's Sun-Earth Connection Education Forum, distribute sample multimedia products, explain the role of NASA's Educator Resource Center, and review our contributions to NASA's Education and Public Outreach effort.

  11. NASA/OAI Collaborative Aerospace Internship and Fellowship Program

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The NASA/OAI Collaborative Aerospace Internship and Fellowship Program is a collaborative undertaking by the Office of Educational Programs at the NASA Lewis Research Center and the Department of Workforce Enhancement at the Ohio Aerospace Institute. This program provides 12 or 14 week internships for undergraduate and graduate students of science and engineering, and for secondary school teachers. Each item is assigned a NASA mentor who facilitates a research assignment. An important aspect of the program is that it includes students with diverse social, cultural and economic backgrounds. The purpose of this report is to document the program accomplishments for 1996.

  12. NASA's explorer school and spaceward bound programs: Insights into two education programs designed to heighten public support for space science initiatives

    USGS Publications Warehouse

    Allner, Matthew; McKay, C.; Coe, L.; Rask, Jon; Paradise, Jim; Wynne, J.J.

    2008-01-01

    Introduction: NASA has played an influential role in bringing the enthusiasm of space science to schools across the United States since the 1980s. The evolution of this public outreach has led to a variety of NASA funded education programs designed to promote student interest in science, technology, engineering, math, and geography (STEM-G) careers. Purpose: This paper investigates the educational outreach initiatives, structure, and impact of two of NASA's largest educational programs: the NASA Explorer School (NES) and NASA Spaceward Bound programs. Methods: The investigation further provides a detailed overview of the structure of these two NASA education outreach programs, while providing information regarding selection criteria and program developments over time. Results: Since its induction in 2003 the NES program has networked and provided resources to over 300 schools across the United States. Future directions include further development of mentor schools for each new NES school selected, while also developing a longitudinal student tracking system for NES students to monitor their future involvement in STEM-G careers. The Spaceward Bound program, now in its third year of teacher outreach, is looking to further expand its teacher network and scientific collaboration efforts, while building on its teacher mentorship framework.

  13. Review of NASA's Exploration Technology Development Program: An Interim Report. [ISBN 0-309-11944-8 (place in D020A)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA requested that a committee under the auspices of the National Research Council's Aeronautics and Space Engineering Board carry out an assessment of NASA's Exploration Technology Development Program (ETDP). Organizationally, this program functions under the direction of NASA's Exploration Systems Mission Directorate and is charged with developing new technologies that will enable NASA to conduct future human and robotic exploration missions, while reducing mission risk and cost. The Committee to Review NASA's Exploration Technology Development Program has been tasked to examine how well the program is aligned with the stated objectives of the President's Vision for Space Exploration (VSE), to identify gaps in the program, and to assess the quality of the research. The full statement of task is given in Appendix A. The committee consists of 25 members and includes a cross section of senior executives, engineers, researchers, and other aerospace professionals drawn from industry, universities, and government agencies with expertise in virtually all the technical fields represented within the program.

  14. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Contents include the following: Executive Summary; Introduction; Scientific Goals for the Exploration of Mars; Overview of Mars Surveyor and Others Mars Missions; Key Issues for NASA's Mars Exploration Program; and Assessment of the Scientific Potential of NASA's Mars Exploration Program.

  15. 48 CFR 1819.7212 - Reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7212 Reporting... prior six months by the protégé in employment, revenues, and participation in NASA contracts during each...

  16. 48 CFR 1819.7212 - Reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7212 Reporting... prior six months by the protégé in employment, revenues, and participation in NASA contracts during each...

  17. 48 CFR 1819.7212 - Reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7212 Reporting... prior six months by the protégé in employment, revenues, and participation in NASA contracts during each...

  18. 48 CFR 1819.7212 - Reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7212 Reporting... prior six months by the protégé in employment, revenues, and participation in NASA contracts during each...

  19. 48 CFR 1819.7212 - Reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7212 Reporting... prior six months by the protégé in employment, revenues, and participation in NASA contracts during each...

  20. Processes and Procedures of the Higher Education Programs at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Heard, Pamala D.

    2002-01-01

    The purpose of my research was to investigate the policies, processes, procedures and timelines for the higher education programs at Marshall Space Flight Center. The three higher education programs that comprised this research included: the Graduate Student Researchers Program (GSRP), the National Research Council/Resident Research Associateships Program (NRC/RRA) and the Summer Faculty Fellowship Program (SFFP). The GSRP award fellowships each year to promising U.S. graduate students whose research interest coincides with NASA's mission. Fellowships are awarded for one year and are renewable for up to three years to competitively selected students. Each year, the award provides students the opportunity to spend a period in residence at a NASA center using that installation's unique facilities. This program is renewable for three years, students must reapply. The National Research Council conducts the Resident Research Associateships Program (NRC/RRA), a national competition to identify outstanding recent postdoctoral scientists and engineers and experience senior scientists and engineers, for tenure as guest researchers at NASA centers. The Resident Research Associateship Program provides an opportunity for recipients of doctoral degrees to concentrate their research in association with NASA personnel, often as a culmination to formal career preparation. The program also affords established scientists and engineers an opportunity for research without any interruptions and distracting assignments generated from permanent career positions. All opportunities for research at NASA Centers are open to citizens of the U.S. and to legal permanent residents. The Summer Faculty Fellowship Program (SFFP) is conducted each summer. NASA awards research fellowships to university faculty through the NASA/American Society for Engineering Education. The program is designed to promote an exchange of ideas between university faculties, NASA scientists and engineers. Selected participants in fields of science, engineering, math, and other disciplines spend approximately 10 weeks working with their professional peers on research projects at NASA facilities. Workshops and seminars further enrich the experience. This program is only for U.S. citizens.

  1. Evaluating the Effectiveness of the 2000-2001 NASA "Why?" Files Program

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Frank, Kari Lou; Ashcroft, Scott B.; Williams, Amy C.

    2002-01-01

    NASA 'Why?' Files, a research and standards-based, Emmy-award winning series of 60-minute instructional programs for grades 3-5, introduces students to NASA; integrates mathematics, science, and technology by using Problem-Based Learning (PBL), scientific inquiry, and the scientific method; and motivates students to become critical thinkers and active problem solvers. All four 2000-2001 NASA 'Why?' Files programs include an instructional broadcast, a lesson guide, an interactive web site, plus numerous instructional resources. In March 2001, 1,000 randomly selected program registrants participated in a survey. Of these surveys, 185 (154 usable) met the established cut-off date. Respondents reported that (1) they used the four programs in the 2000-2001 NASA 'Why?' Files series; (2) series goals and objectives were met; (3) programs met national mathematics, science, and technology standards; (4) program content was developmentally appropriate for grade level; and (5) programs enhanced/enriched the teaching of mathematics, science, and technology.

  2. KSC-2011-6951

    NASA Image and Video Library

    2011-09-13

    CAPE CANAVERAL, Fla. -- NASA and Alliant Techsystems (ATK) managers discuss an agreement that could accelerate the availability of U.S. commercial crew transportation capabilities with media representatives in the Press Site auditorium at NASA's Kennedy Space Center in Florida. From left are Ed Mango, Commercial Crew Program manager, NASA; Kent Rominger, vice president, Strategy and Business Development, ATK Aerospace; and John Schumacher, vice president, Space Programs, EADS North America. The unfunded Space Act Agreement (SAA) through NASA's Commercial Crew Program will allow the agency and ATK to review and discuss Liberty system requirements, safety and certification plans, computational models of rocket stage performance, and avionics architecture designs. The agreement outlines key milestones including an Initial System Design review, during which ATK will present to NASA officials the Liberty systems level requirements, preliminary design, and certification process development. For more information about NASA's Commercial Crew Program, visit http://www.nasa.gov/exploration/commercial. Photo credit: NASA/Jim Grossmann

  3. Environmentally Sensitive Areas Surveys Program threatened and endangered species survey: Progress report. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, A.L.; Awl, D.J.; Gabrielsen, C.A.

    The Endangered Species Act (originally passed in 1973) is a Federal statute that protects both animal and plant species. The Endangered Species Act identifies species which are, without careful management, in danger of becoming extinct and species that are considered threatened. Along with the designation of threatened or endangered, the Endangered Species Act provides for the identification of appropriate habitat for these species. Since 1993, the United States Department of Energy`s (DOE) Environmental Restoration (ER) Program has supported a program to survey the Oak Ridge Reservation (ORR) for threatened and endangered species. The Environmentally Sensitive Areas Surveys Program initiated vascularmore » plant surveys during fiscal year 1993 and vertebrate animal surveys during fiscal year 1994 to determine the baseline condition of threatened and endangered species on the ORR at the present time. Data collected during these surveys are currently aiding Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Investigations on the ORR. They also provide data for ER and Waste Management decision documents, ensure that decisions have technical and legal defensibility, provide a baseline for ensuring compliance with principal legal requirements and will increase public confidence in DOE`s adherence to all related environmental resources rules, laws, regulations, and instructions. This report discusses the progress to date of the threatened and endangered species surveys of the ORR.« less

  4. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  5. Sharing out NASA's spoils. [economic benefits of U.S. space program

    NASA Technical Reports Server (NTRS)

    Bezdek, Roger H.; Wendling, Robert M.

    1992-01-01

    The economic benefits of NASA programs are discussed. Emphasis is given to an analysis of indirect economic benefits which estimates the effect of NASA programs on employment, personal income, corporate sales and profits, and government tax revenues in the U.S. and in each state. Data are presented that show that NASA programs have widely varying multipliers by industry and that illustrate the distribution of jobs by industry as well as the distribution of sales.

  6. NASA scientific and technical program: User survey

    NASA Technical Reports Server (NTRS)

    Hunter, Judy F.; Shockley, Cynthia W.

    1993-01-01

    Results are presented of an intensive user requirements survey conducted by NASA's Scientific and Technical Information (STI) Program with the goal of improving the foundation for the user outreach program. The survey was carried out by interviewing 550 NASA scientists, engineers, and contractors and by analyzing 650 individual responses to a mailed out questionnaire. To analyze the user demographic data, a data base was built and used, and will be applied to ongoing analysis by the NASA STI Program.

  7. NASA's Education Program Inventory FY 91

    NASA Technical Reports Server (NTRS)

    1992-01-01

    In 1988, the Education Division produced an inventory of NASA-supported education programs. Since then, mathematics, science, and technology education has taken on a more visible role, not only as part of NASA's mission, but as part of the National Education Goals and other Federal initiatives. Therefore, it became important to update the 1988 inventory in order to achieve a more accurate and comprehensive look at NASA's educational programs. The data collected is summarized and descriptions of each program are provided.

  8. NASA's Hall Thruster Program 2002

    NASA Technical Reports Server (NTRS)

    Jankovsky, Robert S.; Jacobson, David T.; Pinero, Luis R.; Manzella, David H.; Hofer, Richard R.; Peterson, Peter Y.

    2002-01-01

    The NASA Hall thruster program currently supports a number of tasks related to high power thruster development for a number of customers including the Energetics Program (formerly called the Space-based Program), the Space Solar Power Program, and the In-space Propulsion Program. In program year 2002, two tasks were central to the NASA Hall thruster program: 1) the development of a laboratory Hall thruster capable of providing high thrust at high power-, and 2) investigations into operation of Hall thrusters at high specific impulse. In addition to these two primary thruster development activities, there are a number of other on-going activities supported by the NASA Hall thruster program. These additional activities are related to issues such as high-power power processor architecture, thruster lifetime, and spacecraft integration.

  9. Congressman Mike Oxley talks about Superfund reform

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reimer, C.

    1995-10-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is currently undergoing an extensive review in both the US House of Representatives and Senate. Congress is under some time pressure in its work, as the program`s taxing authority expires at the end of this year. During the last Congress, a coalition of environmentalists, industry members, and others supported reform legislation. However, the 103rd Congress and the coalition`s efforts ultimately failed for various reasons, including Congressional opposition at that time to including a broad risk assessment measure with the Superfund bill. With the November 1994 election, a Republic majority took overmore » both the House and the Senate, and with it came changes; among the changes were new congressional Committee chairmen. National Ground Water Association staff recently spoke with Congressman Michael G. Oxley (R-OH), the new chairman of the House Commerce, Trade, and Hazardous Materials Subcommittee. This House Subcommittee is responsible for Superfund reauthorization issues. Congressman Oxley will play a key role in any Superfund legislation that is drafted and may eventually pass in the 104th Congress.« less

  10. The brownfields program: Reclaiming inner-city sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, B.

    Over the past 25 years, enormous environmental resources have been directed through the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), or Superfund, at cleaning up past environmental abuses, while the Resource Conservation and Recovery Act (RCRA) has been the principal federal statute to prevent future abuses to public health and the environment. Only recently, however, has attention turned to a third general area of concern, the redevelopment of abandoned or underutilized land and buildings in many central cities and inner suburbs of US metropolitan areas. In June of this year, the Office of Technology Assessment (OTA) released a reportmore » called State of the State on Brownfields: Program for Clean-up and Reuse of Contaminated Sites (OTA Report), in which it was estimated that the size of the problem varies from tens of thousands to nearly 450,000 sites. Many brownfield sites are located in the Northeast and Midwest where, historically, much of the economy was based on heavy industrial activity, although in actuality these brownfields are scattered throughout the entire country.« less

  11. Integrated Hydrogeological Model of the General Separations Area, Vol. 2, Rev. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FLACH, GREGORYK.

    1999-04-01

    The 15 mi2 General Separations Area (GSA) contains more than 35 RCRA and CERCLA waste units, and is the focus of numerous ongoing and anticipated contaminant migration and remedial alternatives studies. To meet the analysis needs of GSA remediation programs, a groundwater flow model of the area based on the FACT code was developed. The model is consistent with detailed characterization and monitoring data through 1996. Model preprocessing has been automated so that future updates and modifications can be performed quickly and efficiently. Most remedial action scenarios can be explicitly simulated, including vertical recirculation wells, vertical barriers, surface caps, pumpingmore » wells at arbitrary locations, specified drawdown within well casings (instead of flowrate), and wetland impacts of remedial actions. The model has a fine scale vertical mesh and heterogeneous conductivity field, and includes the vadose zone. Therefore, the model is well suited to support subsequent contaminant transport simulations. the model can provide a common framework for analyzing groundwater flow, contaminant migration, and remedial alternatives across Environmental Restoration programs within the GSA.« less

  12. NASA historical data book. Volume 2: Programs and projects 1958-1968

    NASA Technical Reports Server (NTRS)

    Ezell, Linda Neuman

    1988-01-01

    This is Volume 2, Programs and Projects 1958-1968, of a multi-volume series providing a 20-year compilation of summary statistical and other data descriptive of NASA's programs in aeronautics and manned and unmanned spaceflight. This series is an important component of NASA published historical reference works, used by NASA personnel, managers, external researchers, and other government agencies.

  13. NASTRAN user's guide (Level 17.5)

    NASA Technical Reports Server (NTRS)

    Field, E. I.; Herting, D. N.; Morgan, M. J.

    1979-01-01

    The user's guide is a handbook for engineers and analysts who use the NASTRAN finite element computer program supplements the NASTRAN Theoretical Manual (NASA SP-221), the NASTRAN User's Manual (NASA SP-222), the NASTRAN Programmer's Manual (NASA SP-223), and the NASTRAN Demonstration Program Manual (NASA SP-224). It provides modeling hints, attributes of the program, and references to the four manuals listed.

  14. NASA historical data book. Volume 3: Programs and projects 1969-1978

    NASA Technical Reports Server (NTRS)

    Ezell, Linda Neuman

    1988-01-01

    This is Volume 3, Programs and Projects 1969-1978, of a multi-volume series providing a 20-year compilation of summary statistical and other data descriptive of NASA's programs in aeronautics and manned and unmanned spaceflight. This series is an important component of NASA published historical reference works, used by NASA personnel, managers, external researchers, and other government agencies.

  15. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  16. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (MAY 2009) (a) Prime contractors are encouraged to participate in the...

  17. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  18. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  19. 48 CFR 1852.219-77 - NASA Mentor-Protégé Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA Mentor-ProtégÃ... and Clauses 1852.219-77 NASA Mentor-Protégé Program. As prescribed in 1819.7215, insert the following clause: NASA Mentor-Protégé Program (Month/Year) (a) Prime contractors are encouraged to participate in...

  20. Space Science Research and Technology at NASA's Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Johnson, Charles L.

    2007-01-01

    This presentation will summarize the various projects and programs managed in the Space Science Programs and Projects Office at NASA's Marshall Space Flight Center in Huntsville, Alabama. Projects in the portfolio include NASA's Chandra X-Ray telescope, Hinode solar physics satellite, various advanced space propulsion technologies, including solar sails and tethers, as well as NASA's Discovery and New Frontiers Programs.

  1. University Program Management Information System: NASA's University Program Active Projects

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  2. Overview of Space Science and Information Research Opportunities at NASA

    NASA Technical Reports Server (NTRS)

    Green, James L.

    2000-01-01

    It is not possible to review all the opportunities that NASA provides to support the Space Science Enterprise, in the short amount of time allotted for this presentation. Therefore, only a few key programs will be discussed. The programs that I will discuss will concentrate on research opportunities for faculty, graduate and postdoctoral candidates in Space Science research and information technologies at NASA. One of the most important programs for research opportunities is the NASA Research Announcement or NRA. NASA Headquarters issues NRA's on a regular basis and these cover space science and computer science activities relating to NASA missions and programs. In the Space Sciences, the most important NRA is called the "Research Opportunities in Space Science or the ROSS NRA. The ROSS NRA is composed of multiple announcements in the areas of structure and evolution of the Universe, Solar System exploration, Sun-Earth connections, and applied information systems. Another important opportunity is the Graduate Student Research Program (GSRP). The GSRP is designed to cultivate research ties between a NASA Center and the academic community through the award of fellowships to promising students in science and engineering. This program is unique since it matches the student's area of research interest with existing work being carried out at NASA. This program is for U.S. citizens who are full-time graduate students. Students who are successful have made the match between their research and the NASA employee who will act as their NASA Advisor/ Mentor. In this program, the student's research is primarily accomplished under the supervision of his faculty advisor with periodic or frequent interactions with the NASA Mentor. These interactions typically involve travel to the sponsoring NASA Center on a regular basis. The one-year fellowships are renewable for up to three years and over $20,000 per year. These and other important opportunities will be discussed.

  3. Human Factors Interface with Systems Engineering for NASA Human Spaceflights

    NASA Technical Reports Server (NTRS)

    Wong, Douglas T.

    2009-01-01

    This paper summarizes the past and present successes of the Habitability and Human Factors Branch (HHFB) at NASA Johnson Space Center s Space Life Sciences Directorate (SLSD) in including the Human-As-A-System (HAAS) model in many NASA programs and what steps to be taken to integrate the Human-Centered Design Philosophy (HCDP) into NASA s Systems Engineering (SE) process. The HAAS model stresses systems are ultimately designed for the humans; the humans should therefore be considered as a system within the systems. Therefore, the model places strong emphasis on human factors engineering. Since 1987, the HHFB has been engaging with many major NASA programs with much success. The HHFB helped create the NASA Standard 3000 (a human factors engineering practice guide) and the Human Systems Integration Requirements document. These efforts resulted in the HAAS model being included in many NASA programs. As an example, the HAAS model has been successfully introduced into the programmatic and systems engineering structures of the International Space Station Program (ISSP). Success in the ISSP caused other NASA programs to recognize the importance of the HAAS concept. Also due to this success, the HHFB helped update NASA s Systems Engineering Handbook in December 2007 to include HAAS as a recommended practice. Nonetheless, the HAAS model has yet to become an integral part of the NASA SE process. Besides continuing in integrating HAAS into current and future NASA programs, the HHFB will investigate incorporating the Human-Centered Design Philosophy (HCDP) into the NASA SE Handbook. The HCDP goes further than the HAAS model by emphasizing a holistic and iterative human-centered systems design concept.

  4. 76 FR 41751 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Hipps Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Proposed rule... Hipps Road Landfill Superfund Site (Site) located in Jacksonville, Florida, from the National Priorities..., have determined that all appropriate response actions under CERCLA, other than operation, maintenance...

  5. 40 CFR 35.6345 - Equipment disposal options.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment disposal options. 35.6345 Section 35.6345 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... options. The following disposal options are available: (a) Use the equipment on another CERCLA project and...

  6. 38 CFR 200.5 - Coordination with other authorities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Compensation, and Liability Act (CERCLA); the National Historic Preservation Act (NHPA); the Endangered Species Act (ESA); Executive Orders 11988, 11990, and 13006; and other applicable authorities. (b) In... COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT § 200.5 Coordination with other authorities. (a) To the...

  7. 38 CFR 200.5 - Coordination with other authorities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Compensation, and Liability Act (CERCLA); the National Historic Preservation Act (NHPA); the Endangered Species Act (ESA); Executive Orders 11988, 11990, and 13006; and other applicable authorities. (b) In... COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT § 200.5 Coordination with other authorities. (a) To the...

  8. 38 CFR 200.5 - Coordination with other authorities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Compensation, and Liability Act (CERCLA); the National Historic Preservation Act (NHPA); the Endangered Species Act (ESA); Executive Orders 11988, 11990, and 13006; and other applicable authorities. (b) In... COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT § 200.5 Coordination with other authorities. (a) To the...

  9. 38 CFR 200.5 - Coordination with other authorities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Compensation, and Liability Act (CERCLA); the National Historic Preservation Act (NHPA); the Endangered Species Act (ESA); Executive Orders 11988, 11990, and 13006; and other applicable authorities. (b) In... COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT § 200.5 Coordination with other authorities. (a) To the...

  10. 38 CFR 200.5 - Coordination with other authorities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Compensation, and Liability Act (CERCLA); the National Historic Preservation Act (NHPA); the Endangered Species Act (ESA); Executive Orders 11988, 11990, and 13006; and other applicable authorities. (b) In... COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT § 200.5 Coordination with other authorities. (a) To the...

  11. 76 FR 14968 - Proposed CERCLA Administrative Cost Recovery Settlement; Eugenio Painting Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Settlement; Eugenio Painting Company AGENCY: Environmental Protection Agency. ACTION: Notice; request for... proposed administrative settlement for recovery of past response costs concerning the Industrial Street... settlement requires the settling party to pay $20,000 to the Hazardous Substance Superfund. The settlement...

  12. 26 CFR 1.468B-0 - Table of contents.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED... panels. (f) Resolve or satisfy requirement. (1) Liabilities to provide property or services. (2) CERCLA... settlement fund. (f) Distribution of property. (g) Other taxes. (h) Denial of credits against tax. (i...

  13. 26 CFR 1.468B-0 - Table of contents.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED... services. (2) CERCLA liabilities. (g) Excluded liabilities. (h) Segregation requirement. (1) In general. (2... settlement fund. (f) Distribution of property. (g) Other taxes. (h) Denial of credits against tax. (i...

  14. RESEARCH BRIEFING ON DEVELOPMENT OF A SUB-SLAB AIR SAMPLING PROTOCOL

    EPA Science Inventory

    Vapor intrusion is defined as the migration of volatile organic compounds (VOCs) into occupied buildings from contaminated soil or ground water. EPA recently developed guidance to facilitate assessment of vapor intrusion at sites regulated by RCRA and CERCLA. The EPA guidance e...

  15. 42 CFR 90.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF... appropriate for the purposes of carrying out his or her responsibilities under CERCLA. Health assessment means... order to assess any current or future impact on public health, develop health advisories or other...

  16. 42 CFR 90.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF... appropriate for the purposes of carrying out his or her responsibilities under CERCLA. Health assessment means... order to assess any current or future impact on public health, develop health advisories or other...

  17. 42 CFR 90.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF... appropriate for the purposes of carrying out his or her responsibilities under CERCLA. Health assessment means... order to assess any current or future impact on public health, develop health advisories or other...

  18. 40 CFR 305.26 - Prehearing conference.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND Prehearing... discovery. (1) Discovery shall include any of the methods described in rule 26(a) of the Federal Rules of Civil Procedure. (2) The parties may conduct any mutually agreed upon discovery without participation or...

  19. Report: Significant Data Quality Deficiencies Impede EPA’s Ability to Ensure Companies Can Pay for Cleanups

    EPA Pesticide Factsheets

    Report #16-P-0126, March 31, 2016. Management Alert. Environmental and extensive financial risks exist from the EPA's failure to have accurate and complete data to monitor and ensure compliance with RCRA and CERCLA financial assurance requirements.

  20. 40 CFR 1.47 - Office of Solid Waste and Emergency Response.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... waste sites and spills (including oil spills); long-term strategic planning and special studies; economic and long-term environmental analyses; economic impact assessment of RCRA and CERCLA regulations... responsibility for implementing the Resource Conservation and Recovery Act (RCRA) and the Comprehensive...

Top