Sample records for nasa terminal area

  1. Terminal Area ATM Research at NASA Ames

    NASA Technical Reports Server (NTRS)

    Tobias, Leonard

    1997-01-01

    The presentation will highlight the following: (1) A brief review of ATC research underway 15 years ago; (2) A summary of Terminal Area ATM Tool Development ongoing at NASA Ames; and (3) A projection of research activities 10-15 years from now.

  2. Space shuttle entry terminal area energy management

    NASA Technical Reports Server (NTRS)

    Moore, Thomas E.

    1991-01-01

    A historical account of the development for Shuttle's Terminal Area Energy Management (TAEM) is presented. A derivation and explanation of logic and equations are provided as a supplement to the well documented guidance computation requirements contained within the official Functional Subsystem Software Requirements (FSSR) published by Rockwell for NASA. The FSSR contains the full set of equations and logic, whereas this document addresses just certain areas for amplification.

  3. Taxiway Navigation and Situation Awareness (T-NASA) System : problem, design philosophy, and description of an integrated display suite for low-visibility airport surface operations

    DOT National Transportation Integrated Search

    1996-01-01

    An integrated cockpit display suite, the T-NASA (Taxiway Navigation and : Situation Awareness) system, is under development for NASA's Terminal Area : Productivity (TAP) Low-Visibility Landing and Surface Operations (LVLASO) : program. This system ha...

  4. Initial Concept for Terminal Area Conflict Detection, Alerting, and Resolution Capability on or Near the Airport Surface

    NASA Technical Reports Server (NTRS)

    Green, David F.; Otero, Sharon D.; Barker, Glover D.; Jones, Denise R.

    2009-01-01

    The Next Generation Air Transportation System (NextGen) concept for 2025 envisions the movement of large numbers of people and goods in a safe, efficient, and reliable manner. The NextGen will remove many of the constraints in the current air transportation system, support a wider range of operations, and deliver an overall system capacity up to 3 times that of current operating levels. In order to achieve the NextGen vision, research is necessary in the areas of surface traffic optimization, maximum runway capacity, reduced runway occupancy time, simultaneous single runway operations, and terminal area conflict prevention, among others. The National Aeronautics and Space Administration (NASA) is conducting Collision Avoidance for Airport Traffic (CAAT) research to develop technologies, data, and guidelines to enable Conflict Detection and Resolution (CD&R) in the Airport Terminal Maneuvering Area (ATMA) under current and emerging NextGen operating concepts. In this report, an initial concept for an aircraft-based method for CD&R in the ATMA is presented. This method is based upon previous NASA work in CD&R for runway incursion prevention, the Runway Incursion Prevention System (RIPS). CAAT research is conducted jointly under NASA's Airspace Systems Program, Airportal Project and the Aviation Safety Program, Integrated Intelligent Flight Deck Project.

  5. A Terminal Area Icing Remote Sensing System

    NASA Technical Reports Server (NTRS)

    Reehorst, Andrew L.; Serke, David J.

    2014-01-01

    NASA and the National Center for Atmospheric Research (NCAR) have developed an icing remote sensing technology that has demonstrated skill at detecting and classifying icing hazards in a vertical column above an instrumented ground station. This technology is now being extended to provide volumetric coverage surrounding an airport. With volumetric airport terminal area coverage, the resulting icing hazard information will be usable by aircrews, traffic control, and airline dispatch to make strategic and tactical decisions regarding routing when conditions are conducive to airframe icing. Building on the existing vertical pointing system, the new method for providing volumetric coverage will utilize cloud radar, microwave radiometry, and NEXRAD radar. This terminal area icing remote sensing system will use the data streams from these instruments to provide icing hazard classification along the defined approach paths into an airport. Strategies for comparison to in-situ instruments on aircraft and weather balloons for a planned NASA field test are discussed, as are possible future applications into the NextGen airspace system.

  6. Initial Concept for Terminal Area Conflict Detection, Alerting, and Resolution Capability On or Near the Airport Surface, Version 2.0

    NASA Technical Reports Server (NTRS)

    Otero, Sharon D.; Barker, Glover D.; Jones, Denise R.

    2013-01-01

    The Next Generation Air Transportation System (NextGen) concept for 2025 envisions the movement of large numbers of people and goods in a safe, efficient, and reliable manner. The NextGen will remove many of the constraints in the current air transportation system, support a wider range of operations, and deliver an overall system capacity up to 3 times that of current operating levels. In order to achieve the NextGen vision, research is necessary in the areas of surface traffic optimization, maximum runway capacity, reduced runway occupancy time, simultaneous single runway operations, and terminal area conflict prevention, among others. The National Aeronautics and Space Administration (NASA) is conducting Collision Avoidance for Airport Traffic (CAAT) research to develop technologies, data, and guidelines to enable Conflict Detection and Resolution (CD&R) in the Airport Terminal Maneuvering Area (ATMA) under current and emerging NextGen operating concepts. The term ATMA was created to reflect the fact that the CD&R concept area of operation is focused near the airport within the terminal maneuvering area. In the following, an initial concept for an aircraft-based method for CD&R in the ATMA is presented. This method is based upon previous NASA work in CD&R for runway incursion prevention, the Runway Incursion Prevention System (RIPS).

  7. Operational benefits from the terminal configured vehicle

    NASA Technical Reports Server (NTRS)

    Reeder, J. P.; Schmitz, R. A.; Clark, L. V.

    1979-01-01

    The NASA Terminal Configured Vehicle is a flying laboratory used to conduct research and development on improved airborne systems (including avionics) and operational flight procedures, with particular emphasis on utilization in the terminal area environment. The objectives of this technology development activity, focused on conventional transport aircraft, are to develop and demonstrate improvements which can lead to increased airport and runway capacity, increased air traffic controller productivity, energy efficient terminal area operations, reduced weather minima with safety, and reduced community noise by use of appropriate procedures. This paper discusses some early results of this activity in addition to defining present efforts and future research plans.

  8. Coordinated Parallel Runway Approaches

    NASA Technical Reports Server (NTRS)

    Koczo, Steve

    1996-01-01

    The current air traffic environment in airport terminal areas experiences substantial delays when weather conditions deteriorate to Instrument Meteorological Conditions (IMC). Expected future increases in air traffic will put additional pressures on the National Airspace System (NAS) and will further compound the high costs associated with airport delays. To address this problem, NASA has embarked on a program to address Terminal Area Productivity (TAP). The goals of the TAP program are to provide increased efficiencies in air traffic during the approach, landing, and surface operations in low-visibility conditions. The ultimate goal is to achieve efficiencies of terminal area flight operations commensurate with Visual Meteorological Conditions (VMC) at current or improved levels of safety.

  9. Highly Automated Arrival Management and Control System Suitable for Early NextGen

    NASA Technical Reports Server (NTRS)

    Swenson, Harry N.; Jung, Jaewoo

    2013-01-01

    This is a presentation of previously published work conducted in the development of the Terminal Area Precision Scheduling and Spacing (TAPSS) system. Included are concept and technical descriptions of the TAPSS system and results from human in the loop simulations conducted at Ames Research Center. The Terminal Area Precision Scheduling and Spacing system has demonstrated through research and extensive high-fidelity simulation studies to have benefits in airport arrival throughput, supporting efficient arrival descents, and enabling mixed aircraft navigation capability operations during periods of high congestion. NASA is currently porting the TAPSS system into the FAA TBFM and STARS system prototypes to ensure its ability to operate in the FAA automation Infrastructure. NASA ATM Demonstration Project is using the the TAPSS technologies to provide the ground-based automation tools to enable airborne Interval Management (IM) capabilities. NASA and the FAA have initiated a Research Transition Team to enable potential TAPSS and IM Technology Transfer.

  10. Microbiological surveillance of food handling at NASA-MSFC

    NASA Technical Reports Server (NTRS)

    Beyerle, F. J.

    1973-01-01

    A microbiological surveillance program of cafeterias and snack bars was conducted to supplement the inspections by NASA Medical Center personnel and to gather information for cafeteria management to pinpoint areas of possible contamination. The work conducted under the program from its inception in January, 1972, to its termination on September 15, 1972 is summarized. Ten food handling facilities were included in the surveillance at NASA-MSFC.

  11. Reduction of Weather-Related Terminal Area Delays in the Free-Flight Era

    NASA Technical Reports Server (NTRS)

    Johnson, Sally C.; Chin, David K.; Rovinsky, Robert B.; Kostiuk, Peter F.; Lee, David A.; Hemm, Robert V.; Wingrove, Earl R., III

    1996-01-01

    While much of the emphasis of the free-flight movement has been concentrated on reducing en-route delays, airport capacity is a major bottleneck in the current airspace system, particularly during bad weather. According to the Air Transport Association (ATA) Air Carrier Delay Reports, ground delays (gate-hold, taxi-in, and taxi-out) comprise 75 percent of total delays. It is likely that the projected steady growth in traffic will only exacerbate these losses. Preliminary analyses show that implementation of the terminal area technologies and procedures under development in NASA s Terminal Area Productivity program can potentially save the airlines at least $350M annually in weather-related delays by the year 2005 at Boston Logan and Detroit airports alone. This paper briefly describes the Terminal Area Productivity program, outlines the costhenefit analyses that are being conducted in support of the program, and presents some preliminary analysis results.

  12. Terminal-area STOL operating systems experiments program

    NASA Technical Reports Server (NTRS)

    Smith, D. W.; Watson, D.; Christensen, J. V.

    1973-01-01

    Information which will aid in the choice by the U.S. Government and industry of system concepts, design criteria, operating procedures for STOL aircraft and STOL ports, STOL landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. Ames has developed a terminal-area STOL operating systems experiments program which is a part of the joint DOT/NASA effort is discussed. The Ames operating systems experiments program, its objectives, the program approach, the program schedule, typical experiments, the research facilities to be used, and the program status are described.

  13. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  14. Analysis of in-trail following dynamics of CDTI-equipped aircraft. [Cockpit Displays of Traffic Information

    NASA Technical Reports Server (NTRS)

    Sorensen, J. A.; Goka, T.

    1982-01-01

    In connection with the necessity to provide greater terminal area capacity, attention is given to approaches in which the required increase in capacity will be obtained by making use of more automation and by involving the pilot to a larger degree in the air traffic control (ATC) process. It was recommended that NASA should make extensive use of its research aircraft and cockpit simulators to assist the FAA in examining the capabilities and limitations of cockpit displays of traffic information (CDTI). A program was organized which utilizes FAA ATC (ground-based) simulators and NASA aircraft and associated cockpit simulators in a research project which explores applications of the CDTI system. The present investigation is concerned with several questions related to the CDTI-based terminal area traffic tactical control concepts. Attention is given to longitudinal separation criteria, a longitudinal following model, longitudinal capture, combined longitudinal/vertical control, and lateral control.

  15. System analysis for the Huntsville Operation Support Center distributed computer system

    NASA Technical Reports Server (NTRS)

    Ingels, F. M.

    1986-01-01

    A simulation model of the NASA Huntsville Operational Support Center (HOSC) was developed. This simulation model emulates the HYPERchannel Local Area Network (LAN) that ties together the various computers of HOSC. The HOSC system is a large installation of mainframe computers such as the Perkin Elmer 3200 series and the Dec VAX series. A series of six simulation exercises of the HOSC model is described using data sets provided by NASA. The analytical analysis of the ETHERNET LAN and the video terminals (VTs) distribution system are presented. An interface analysis of the smart terminal network model which allows the data flow requirements due to VTs on the ETHERNET LAN to be estimated, is presented.

  16. NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Swenson, Harry N.; Prevot, Thomas; Callantine, Todd J.

    2012-01-01

    This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  17. NASA aviation safety reporting system

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A decline in reports concerning small aircraft was noted; more reports involved transport aircraft, professional pilots, instrument meteorological conditions, and weather problems. A study of 136 reports of operational problems in terminal radar service areas was made. Pilot, controller, and system factors were found to be associated with these occurrences. Information transfer difficulties were prominent. Misunderstandings by pilots, and in some cases by controllers, of the policies and limitations of terminal radar programs were observed.

  18. Status of the Direct Data Distribution (D(exp 3)) Experiment

    NASA Technical Reports Server (NTRS)

    Wald, Lawrence

    2001-01-01

    NASA Glenn Research Center's Direct Data Distribution (D3) project will demonstrate an advanced, high-performance communications system that transmits information from an advanced technology payload carried by a NASA spacecraft in low Earth orbit (LEO) to a small receiving terminal on Earth. The space-based communications package will utilize a solid-state, K-band phased-array antenna that electronically steers the radiated energy beam toward a low-cost, tracking ground terminal, thereby providing agile, vibration-free, electronic steering at reduced size and weight with increased reliability. The array-based link will also demonstrate new digital processing technology that will allow the transmission of substantially increased amounts of latency-tolerant data collected from the LEO spacecraft directly to NASA field centers, principal investigators, or into the commercial terrestrial communications network. The technologies demonstrated by D3 will facilitate NASA's transition from using Government-owned communication assets to using commercial communication services. The hardware for D3 will incorporate advanced technology components developed under the High Rate Data Delivery (HRDD) Thrust Area of NASA's Office of Aerospace Technology Space Base Program at Glenn's Communications Technology Division. The flight segment components will include the electrically steerable phased-array antenna, which is being built by the Raytheon System Corporation and utilizes monolithic microwave integrated circuit (MMIC) technology operating at 19.05 GHz; and the digital encoder/modulator chipset, which uses four-channel orthogonal frequency division multiplexing (OFDM). The encoder/modulator will use a chipset developed by SICOM, Inc., which is both bandwidth and power efficient. The ground segment components will include a low-cost, open-loop tracking ground terminal incorporating a cryoreceiver to minimize terminal size without compromising receiver capability. The project is planning to hold a critical design review in the second quarter of fiscal year 2002.

  19. Utilization of NASA Lewis mobile terminals for the Hermes satellite

    NASA Technical Reports Server (NTRS)

    Edelman, E. A.; Fiala, J. L.; Rizzolla, L.

    1977-01-01

    The high power of the Hermes satellite enables two-way television and voice communication with small ground terminals. The Portable Earth Terminal (PET) and the Transportable Earth Terminal (TET) were developed and built by NASA-Lewis to provide communications capability to short-term users. The NASA-Lewis mobile terminals are described in terms of vehicles and onboard equipment, as well as operation aspects, including use in the field. The section on demonstrations divides the uses into categories of medicine, education, technology and government. Applications of special interest within each category are briefly described.

  20. Aircraft Safety and Operating Problems. [conference

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Results of NASA research in the field of aircraft safety and operating problems are discussed. Topics include: (1) terminal area operations, (2) flight dynamics and control; (3) ground operations; (4) atmospheric environment; (5) structures and materials; (6) powerplants; (7) noise; and (8) human factors engineering.

  1. Airborne Satcom Terminal Research at NASA Glenn

    NASA Technical Reports Server (NTRS)

    Hoder, Doug; Zakrajsek, Robert

    2002-01-01

    NASA Glenn has constructed an airborne Ku-band satellite terminal, which provides wideband full-duplex ground-aircraft communications. The terminal makes use of novel electronically-steered phased array antennas and provides IP connectivity to and from the ground. The satcom terminal communications equipment may be easily changed whenever a new configuration is required, enhancing the terminal's versatility.

  2. Evaluation of the Terminal Precision Scheduling and Spacing System for Near-Term NAS Application

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Martin, Lynne Hazel; Swenson, Harry N.; Lin, Paul; Nguyen, Jimmy

    2012-01-01

    NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to provide higher capacity and more efficiently manage arrivals during peak demand periods. This advanced technology is NASA's vision for the NextGen terminal metering capability. A set of human-in-the-loop experiments was conducted to evaluate the performance of the TAPSS system for near-term implementation. The experiments evaluated the TAPSS system under the current terminal routing infrastructure to validate operational feasibility. A second goal of the study was to measure the benefit of the Center and TRACON advisory tools to help prioritize the requirements for controller radar display enhancements. Simulation results indicate that using the TAPSS system provides benefits under current operations, supporting a 10% increase in airport throughput. Enhancements to Center decision support tools had limited impact on improving the efficiency of terminal operations, but did provide more fuel-efficient advisories to achieve scheduling conformance within 20 seconds. The TRACON controller decision support tools were found to provide the most benefit, by improving the precision in schedule conformance to within 20 seconds, reducing the number of arrivals having lateral path deviations by 50% and lowering subjective controller workload. Overall, the TAPSS system was found to successfully develop an achievable terminal arrival metering plan that was sustainable under heavy traffic demand levels and reduce the complexity of terminal operations when coupled with the use of the terminal controller advisory tools.

  3. Estimating the Effects of the Terminal Area Productivity Program

    NASA Technical Reports Server (NTRS)

    Lee, David A.; Kostiuk, Peter F.; Hemm, Robert V., Jr.; Wingrove, Earl R., III; Shapiro, Gerald

    1997-01-01

    The report describes methods and results of an analysis of the technical and economic benefits of the systems to be developed in the NASA Terminal Area Productivity (TAP) program. A runway capacity model using parameters that reflect the potential impact of the TAP technologies is described. The runway capacity model feeds airport specific models which are also described. The capacity estimates are used with a queuing model to calculate aircraft delays, and TAP benefits are determined by calculating the savings due to reduced delays. The report includes benefit estimates for Boston Logan and Detroit Wayne County airports. An appendix includes a description and listing of the runway capacity model.

  4. Flight Deck Display Technologies for 4DT and Surface Equivalent Visual Operations

    NASA Technical Reports Server (NTRS)

    Prinzel, Lawrence J., III; Jones, Denis R.; Shelton, Kevin J.; Arthur, Jarvis J., III; Bailey, Randall E.; Allamandola, Angela S.; Foyle, David C.; Hooey, Becky L.

    2009-01-01

    NASA research is focused on flight deck display technologies that may significantly enhance situation awareness, enable new operating concepts, and reduce the potential for incidents/accidents for terminal area and surface operations. The display technologies include surface map, head-up, and head-worn displays; 4DT guidance algorithms; synthetic and enhanced vision technologies; and terminal maneuvering area traffic conflict detection and alerting systems. This work is critical to ensure that the flight deck interface technologies and the role of the human participants can support the full realization of the Next Generation Air Transportation System (NextGen) and its novel operating concepts.

  5. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  6. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  7. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  8. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... available at http://www.osbp.nasa.gov. (b) NASA OSBP maintains the right to terminate an agreement if... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement... achieved, or for other reasons as determined necessary by the NASA OSBP. ...

  9. Flight performance of the TCV B-737 airplane at Montreal/Dorval International Airport, Montreal, Canada, using TRSB/MLS guidance

    NASA Technical Reports Server (NTRS)

    White, W. F.; Clark, L. V.

    1980-01-01

    The NASA terminal configured vehicle B-737 was flown in support of the world wide FAA demonstration of the time reference scanning beam microwave landing system. A summary of the flight performance of the TCV airplane during demonstration automatic approaches and landings while utilizing TRSB/MLS guidance is presented. The TRSB/MLS provided the terminal area guidance necessary for automatically flying curved, noise abatement type approaches and landings with short finals.

  10. Evaluation of a Terminal Area In-Trail Approach Spacing, Project and Study

    NASA Technical Reports Server (NTRS)

    Shelden, Stephen; Johnson, Walter (Editor)

    2001-01-01

    Reported here are the results of work completed as a precursor to Distributed Air Ground (DAG), Concept Element 11 (CE11) research. CE11 is a NASA, Advanced Air Transportation Technologies (AATT) concept initiated to promote research on in-trail merging and spacing during approach in the terminal area environment, such that improvements to the National Air Space (NAS) may be realized. A description of the project concept, results of a preliminary study, and a literature review are presented. In terms of conclusions, study results, and reference material respectively: 1) the concept is supported as being significant to NAS capacity improvement, 2) the preliminary study indicated that having more than one downstream, in-trail aircraft present on a CDTI during approach may be advantageous, and that flying traditional Standard Terminal Arrival Routes (STAR) utilizing advanced decision support tools (DST) may be complicated by wake turbulence considerations, a lack of vertical awareness on the part of the flight crew, and the 'step-down' nature of many terminal area approaches, and 3) the results of a literature review are presented for future reference.

  11. A Concept for Robust, High Density Terminal Air Traffic Operations

    NASA Technical Reports Server (NTRS)

    Isaacson, Douglas R.; Robinson, John E.; Swenson, Harry N.; Denery, Dallas G.

    2010-01-01

    This paper describes a concept for future high-density, terminal air traffic operations that has been developed by interpreting the Joint Planning and Development Office s vision for the Next Generation (NextGen) Air Transportation System and coupling it with emergent NASA and other technologies and procedures during the NextGen timeframe. The concept described in this paper includes five core capabilities: 1) Extended Terminal Area Routing, 2) Precision Scheduling Along Routes, 3) Merging and Spacing, 4) Tactical Separation, and 5) Off-Nominal Recovery. Gradual changes are introduced to the National Airspace System (NAS) by phased enhancements to the core capabilities in the form of increased levels of automation and decision support as well as targeted task delegation. NASA will be evaluating these conceptual technological enhancements in a series of human-in-the-loop simulations and will accelerate development of the most promising capabilities in cooperation with the FAA through the Efficient Flows Into Congested Airspace Research Transition Team.

  12. Timeline analysis program (TLA-1), appendices

    NASA Technical Reports Server (NTRS)

    Miller, K. H.

    1976-01-01

    Appendices for the Timeline Analysis Program (TLA-1) were given. The appendices contain the Atlanta terminal area scenarios, the task catalog and the control and display configurations for the forward and aft flight decks of the NASA 515 aircraft, and the event/procedure, phase, mission, and subsystem catalogs.

  13. Analysis of 2015 Winter In-Flight Icing Case Studies with Ground-Based Remote Sensing Systems Compared to In-Situ SLW Sondes

    NASA Technical Reports Server (NTRS)

    Serke, David J.; King, Michael Christopher; Hansen, Reid; Reehorst, Andrew L.

    2016-01-01

    National Aeronautics and Space Administration (NASA) and the National Center for Atmospheric Research (NCAR) have developed an icing remote sensing technology that has demonstrated skill at detecting and classifying icing hazards in a vertical column above an instrumented ground station. This technology has recently been extended to provide volumetric coverage surrounding an airport. Building on the existing vertical pointing system, the new method for providing volumetric coverage utilizes a vertical pointing cloud radar, a multi-frequency microwave radiometer with azimuth and elevation pointing, and a NEXRAD radar. The new terminal area icing remote sensing system processes the data streams from these instruments to derive temperature, liquid water content, and cloud droplet size for each examined point in space. These data are then combined to ultimately provide icing hazard classification along defined approach paths into an airport. To date, statistical comparisons of the vertical profiling technology have been made to Pilot Reports and Icing Forecast Products. With the extension into relatively large area coverage and the output of microphysical properties in addition to icing severity, the use of these comparators is not appropriate and a more rigorous assessment is required. NASA conducted a field campaign during the early months of 2015 to develop a database to enable the assessment of the new terminal area icing remote sensing system and further refinement of terminal area icing weather information technologies in general. In addition to the ground-based remote sensors listed earlier, in-situ icing environment measurements by weather balloons were performed to produce a comprehensive comparison database. Balloon data gathered consisted of temperature, humidity, pressure, super-cooled liquid water content, and 3-D position with time. Comparison data plots of weather balloon and remote measurements, weather balloon flight paths, bulk comparisons of integrated liquid water content and icing cloud extent agreement, and terminal-area hazard displays are presented. Discussions of agreement quality and paths for future development are also included.

  14. Integrated Airport Surface Operations

    NASA Technical Reports Server (NTRS)

    Koczo, S.

    1998-01-01

    The current air traffic environment in airport terminal areas experiences substantial delays when weather conditions deteriorate to Instrument Meteorological Conditions (IMC). Research activity at NASA has culminated in the development, flight test and demonstration of a prototype Low Visibility Landing and Surface Operations (LVLASO) system. A NASA led industry team and the FAA developed the system which integrated airport surface surveillance systems, aeronautical data links, DGPS navigation, automation systems, and controller and flight deck displays. The LVLASO system was demonstrated at the Hartsfield-Atlanta International Airport using a Boeing 757-200 aircraft during August, 1997. This report documents the contractors role in this testing particularly in the area of data link and DGPS navigation.

  15. Simulation of time-control procedures for terminal area flow management

    NASA Technical Reports Server (NTRS)

    Alcabin, M.; Erzberger, H.; Tobias, L.; Obrien, P. J.

    1985-01-01

    Simulations of a terminal area traffic-management system incorporating automated scheduling and time-control (four-dimensional) techniques conducted at NASA Ames Research Center jointly with the Federal Aviation Administration, have shown that efficient procedures can be developed for handling a mix of 4D-equipped and conventionally equipped aircraft. A crucial role in this system is played by an ATC host computer algorithm, referred to as a speed advisory, that allows controllers to maintain accurate time schedules of the conventionally equipped aircraft in the traffic mix. Results are of the most recent simulations in which two important special cases were investigated. First, the effects of a speed advisory on touchdown time scheduling are examined, when unequipped aircraft are constrained to follow fuel-optimized profiles in the near-terminal area, and rescheduling procedures are developed to handle missed approaches of 4D-equipped aircraft. Various performance measures, including controller opinion, are used to evaluate the effectiveness of the procedures.

  16. Civil Tiltrotor Feasibility Study for the New York and Washington Terminal Areas

    NASA Technical Reports Server (NTRS)

    Stouffer, Virginia; Johnson, Jesse; Gribko, Joana; Yackovetsky, Robert (Technical Monitor)

    2001-01-01

    NASA tasked LMI to assess the potential contributions of a yet-undeveloped Civil Tiltrotor aircraft (CTR) in improving capacity in the National Airspace System in all weather conditions. The CTRs studied have assumed operating parameters beyond current CTR capabilities. LMI analyzed CTRs three ways: in fast-time terminal area modeling simulations of New York and Washington to determine delay and throughput impacts; in the Integrated Noise Model, to determine local environmental impact; and with an economic model, to determine the price viability of a CTR. The fast-time models encompassed a 250 nmi range and included traffic interactions from local airports. Both the fast-time simulation and the noise model assessed impacts from traffic levels projected for 1999, 2007, and 2017. Results: CTRs can reduce terminal area delays due to concrete congestion in all time frames. The maximum effect, the ratio of CTRs to jets and turboprop aircraft at a subject airport should be optimized. The economic model considered US traffic only and forecasted CTR sales beginning in 2010.

  17. Evaluation of the Terminal Area Precision Scheduling and Spacing System for Performance-Based Navigation Arrivals

    NASA Technical Reports Server (NTRS)

    Jung, Jaewoo; Swenson, Harry; Thipphavong, Jane; Martin, Lynne Hazel; Chen, Liang; Nguyen, Jimmy

    2013-01-01

    The growth of global demand for air transportation has put increasing strain on the nation's air traffic management system. To relieve this strain, the International Civil Aviation Organization has urged all nations to adopt Performance-Based Navigation (PBN), which can help to reduce air traffic congestion, decrease aviation fuel consumption, and protect the environment. NASA has developed a Terminal Area Precision Scheduling and Spacing (TAPSS) system that can support increased use of PBN during periods of high traffic, while supporting fuel-efficient, continuous descent approaches. In the original development of this system, arrival aircraft are assigned fuel-efficient Area Navigation (RNAV) Standard Terminal Arrival Routes before their initial descent from cruise, with routing defined to a specific runway. The system also determines precise schedules for these aircraft that facilitate continuous descent through the assigned routes. To meet these schedules, controllers are given a set of advisory tools to precisely control aircraft. The TAPSS system has been evaluated in a series of human-in-the-loop (HITL) air traffic simulations during 2010 and 2011. Results indicated increased airport arrival throughput up to 10 over current operations, and maintained fuel-efficient aircraft decent profiles from the initial descent to landing with reduced controller workload. This paper focuses on results from a joint NASA and FAA HITL simulation conducted in 2012. Due to the FAA rollout of the advance terminal area PBN procedures at mid-sized airports first, the TAPSS system was modified to manage arrival aircraft as they entered Terminal Radar Approach Control (TRACON). Dallas-Love Field airport (DAL) was selected by the FAA as a representative mid-sized airport within a constrained TRACON airspace due to the close proximity of a major airport, in this case Dallas-Ft Worth International Airport, one of the busiest in the world. To address this constraint, RNAV routes and Required Navigation Performance with the particular capability known as Radius-to-Fix (RNP-RF) approaches to a short final were used. The purpose of this simulation was to get feedback on how current operations could benefit with the TAPSS system and also to evaluate the efficacy of the advisory tools to support the broader use of PBN in the US National Airspace System. For this NASA-FAA joint experiment, an Air Traffic Control laboratory at NASA Ames was arranged to simulate arrivals into DAL in Instrument Meteorological Conditions utilizing parallel dependent approaches, with two feeder positions that handed off traffic to one final position. Four FAA controllers participated, alternately covering these three positions. All participants were Full-Performance Level terminal controllers and members of the National Air Traffic Controllers Association. During the simulation, PBN arrival operations were compared and contrasted in three conditions. They were the Baseline, where none of the TAPSS systems TRACON controller decision support advisories were provided, the Limited Advisories, reflecting the existing but dormant capabilities of the current terminal automation equipment with providing a subset of the TAPSS systems advisories; numerical delay, landing sequence, and runway assignment information, and the Full Advisories, with providing the following in addition to the ones in the Limited condition; trajectory slot markers, timelines of estimated times of arrivals and sched

  18. Contracts, grants and funding summary of supersonic cruise research and variable-cycle engine technology programs, 1972 - 1982

    NASA Technical Reports Server (NTRS)

    Hoffman, S.; Varholic, M. C.

    1983-01-01

    NASA-SCAR (AST) program was initiated in 1972 at the direct request of the Executive Office of the White House and Congress following termination of the U.S. SST program. The purpose of SCR was to conduct a focused research and technology program on those technology programs which contributed to the SST termination and, also, to provide an expanded data base for future civil and military supersonic transport aircraft. Funding for the Supersonic Cruise Research (SCR) Program was initiated in fiscal year 1973 and terminated in fiscal year 1981. The program was implemented through contracts and grants with industry, universities, and by in-house investigations at the NASA/OAST centers. The studies included system studies and five disciplines: propulsion, stratospheric emissions impact, materials and structures, aerodynamic performance, and stability and control. The NASA/Lewis Variable-Cycle Engine (VCE) Component Program was initiated in 1976 to augment the SCR program in the area of propulsion. After about 2 years, the title was changed to VCE Technology program. The total number of contractors and grantees on record at the AST office in 1982 was 101 for SCR and 4 for VCE. This paper presents a compilation of all the contracts and grants as well as the funding summaries for both programs.

  19. NASA technical advances in aircraft occupant safety. [clear air turbulence detectors, fire resistant materials, and crashworthiness

    NASA Technical Reports Server (NTRS)

    Enders, J. H.

    1978-01-01

    NASA's aviation safety technology program examines specific safety problems associated with atmospheric hazards, crash-fire survival, control of aircraft on runways, human factors, terminal area operations hazards, and accident factors simulation. While aircraft occupants are ultimately affected by any of these hazards, their well-being is immediately impacted by three specific events: unexpected turbulence encounters, fire and its effects, and crash impact. NASA research in the application of laser technology to the problem of clear air turbulence detection, the development of fire resistant materials for aircraft construction, and to the improvement of seats and restraint systems to reduce crash injuries are reviewed.

  20. Health education telecommunications experiment

    NASA Technical Reports Server (NTRS)

    Whalen, A. A.

    1975-01-01

    The Health/Education Telecommunications Experiment (HET) was conducted jointly by NASA and HEW on NASA's ATS-6 communications satellite. This experiment actually consisted of six experiments testing health and education applications of a communication spacecraft producing a broadcast of color television directly from space to over 120 low-cost receivers located in remote rural areas throughout the U.S. (including Alaska). The experiments were conducted over the period from 2 July 1974 to 20 May 1975 and operated on an almost daily basis. The overall telecommunications system to support these experiments consisted of many elements: The ATS-6 spacecraft; five different types of earth stations consisting of 120 video receive terminals, 51 telephony tranceivers and eight video originating terminals of three different types. Actual performance of the equipment as measured in the field was shown to equal or exceed predicted values.

  1. 48 CFR 1849.505-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1849.505-70 Section 1849.505-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Contract Termination Clauses 1849.505-70 NASA...

  2. 48 CFR 1849.505-70 - NASA contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clause. 1849.505-70 Section 1849.505-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Contract Termination Clauses 1849.505-70 NASA...

  3. 48 CFR 1849.505-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1849.505-70 Section 1849.505-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Contract Termination Clauses 1849.505-70 NASA...

  4. 48 CFR 1849.505-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1849.505-70 Section 1849.505-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Contract Termination Clauses 1849.505-70 NASA...

  5. 48 CFR 1849.505-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1849.505-70 Section 1849.505-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Contract Termination Clauses 1849.505-70 NASA...

  6. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  7. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  8. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  9. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  10. 14 CFR § 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... If a dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro...

  11. Air Traffic Management Research at NASA Ames

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.

    2012-01-01

    The Aviation Systems Division at the NASA Ames Research Center conducts leading edge research in air traffic management concepts and technologies. This overview will present concepts and simulation results for research in traffic flow management, safe and efficient airport surface operations, super density terminal area operations, separation assurance and system wide modeling and simulation. A brief review of the ongoing air traffic management technology demonstration (ATD-1) will also be presented. A panel discussion, with Mr. Davis serving as a panelist, on air traffic research will follow the briefing.

  12. NASA TLA workload analysis support. Volume 1: Detailed task scenarios for general aviation and metering and spacing studies

    NASA Technical Reports Server (NTRS)

    Sundstrom, J. L.

    1980-01-01

    The techniques required to produce and validate six detailed task timeline scenarios for crew workload studies are described. Specific emphasis is given to: general aviation single pilot instrument flight rules operations in a high density traffic area; fixed path metering and spacing operations; and comparative workload operation between the forward and aft-flight decks of the NASA terminal control vehicle. The validation efforts also provide a cursory examination of the resultant demand workload based on the operating procedures depicted in the detailed task scenarios.

  13. Johnson Space Center: Workmanship Training

    NASA Technical Reports Server (NTRS)

    Patterson, Ashley; Sikes, Larry; Corbin, Cheryl; Rucka, Becky

    2015-01-01

    Special processes require special skills, knowledge and experienced application. For over 15 years, the NASA Johnson Space Center's Receiving, Inspection and Test Facility (RITF) has provided Agency-wide NASA Workmanship Standards compliance training, issuing more than 500 to 800 training completion certificates annually. It is critical that technicians and inspectors are trained and that they maintain their proficiency to implement the applicable standards and specifications. Training services include "hands-on" training to engineers, technicians, and inspectors in the areas of electrostatic discharge (ESD), soldering, surface mount technology (SMT), crimping, conformal coating, and fiber-optic terminations.

  14. Resolving Off-Nominal Situations in Schedule-Based Terminal Area Operations: Results from a Human-in-the-Loop Simulation

    NASA Technical Reports Server (NTRS)

    Mercer, Joey; Callantine, Todd; Martin, Lynne

    2012-01-01

    A recent human-in-the-loop simulation in the Airspace Operations Laboratory (AOL) at NASA's Ames Research Center investigated the robustness of Controller-Managed Spacing (CMS) operations. CMS refers to AOL-developed controller tools and procedures for enabling arrivals to conduct efficient Optimized Profile Descents with sustained high throughput. The simulation provided a rich data set for examining how a traffic management supervisor and terminal-area controller participants used the CMS tools and coordinated to respond to off-nominal events. This paper proposes quantitative measures for characterizing the participants responses. Case studies of go-around events, replicated during the simulation, provide insights into the strategies employed and the role the CMS tools played in supporting them.

  15. NASA Research For Instrument Approaches To Closely Spaced Parallel Runways

    NASA Technical Reports Server (NTRS)

    Elliott, Dawn M.; Perry, R. Brad

    2000-01-01

    Within the NASA Aviation Systems Capacity Program, the Terminal Area Productivity (TAP) Project is addressing airport capacity enhancements during instrument meteorological condition (IMC). The Airborne Information for Lateral Spacing (AILS) research within TAP has focused on an airborne centered approach for independent instrument approaches to closely spaced parallel runways using Differential Global Positioning System (DGPS) and Automatic Dependent Surveillance-Broadcast (ADS-B) technologies. NASA Langley Research Center (LaRC), working in partnership with Honeywell, Inc., completed in AILS simulation study, flight test, and demonstration in 1999 examining normal approaches and potential collision scenarios to runways with separation distances of 3,400 and 2,500 feet. The results of the flight test and demonstration validate the simulation study.

  16. Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps), Version 2.0

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Johnson, William C.; Swenson, Harry N.; Robinson, John E.; Prevot, Tom; Callantine, Todd J.; Scardina, John; Greene, Michael

    2013-01-01

    This document is an update to the operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) integrates three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to the Final Approach Fix. These arrival streams are Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and their implantation into an operational environment. The ATD-1 goals include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  17. The 1980 Aircraft Safety and Operating Problems, part 1

    NASA Technical Reports Server (NTRS)

    Stickle, J. W. (Compiler)

    1981-01-01

    It is difficult to categorize aircraft operating problems, human factors and safety. Much of NASA's research involves all three and considers the important inter-relationships between man, the machine and the environment, whether the environment be man-made or natural. Topics covered in 20 papers include terminal-area operations; avionics and human factors; and the atmospheric environment.

  18. Wake Vortex Research in the USA (WakeNet-USA)

    NASA Technical Reports Server (NTRS)

    Lang, Steve; Bryant, Wayne

    2006-01-01

    This viewgraph presentation reviews the cooperative work that FAA and NASA are engaged in to safely increase the capacity of the National Airspace System by studying the wake vortex operations. Wake vortex avoidance is a limiting factor in defining separation standards in the airport terminal area and could become a reducing separation standards in en route airspace.

  19. The Center/TRACON Automation System (CTAS): A video presentation

    NASA Technical Reports Server (NTRS)

    Green, Steven M.; Freeman, Jeannine

    1992-01-01

    NASA Ames, working with the FAA, has developed a highly effective set of automation tools for aiding the air traffic controller in traffic management within the terminal area. To effectively demonstrate these tools, the video AAV-1372, entitled 'Center/TRACON Automation System,' was produced. The script to the video is provided along with instructions for its acquisition.

  20. Synthesis and Characterization of Processable Polyimides with Enhanced Thermal Stability

    NASA Technical Reports Server (NTRS)

    Harris, Frank W.

    1999-01-01

    The following is a summary report of the research carried out under NASA Grant NAG-1-448. The work was divided into four major areas: 1) Enhanced polyimide processing through the use of reactive plasticizers 2) Development of processable polyhenylquinoxalines 3) Synthesis and characterization of perfluorovinylether-terminated imide oligomers and 4) Fluorosilicones containing perfuorocyclobutane rings.

  1. An aeronautical mobile satellite experiment

    NASA Technical Reports Server (NTRS)

    Jedrey, T. C.; Dessouky, K. I.; Lay, N. E.

    1990-01-01

    The various activities and findings of a NASA/FAA/COMSAT/INMARSAT collaborative aeronautical mobile satellite experiment are detailed. The primary objective of the experiment was to demonstrate and evaluate an advanced digital mobile satellite terminal developed at the Jet Propulsion Laboratory under the NASA Mobile Satellite Program. The experiment was a significant milestone for NASA/JPL, since it was the first test of the mobile terminal in a true mobile satellite environment. The results were also of interest to the general mobile satellite community because of the advanced nature of the technologies employed in the terminal.

  2. High-speed image transmission via the Advanced Communication Technology Satellite (ACTS)

    NASA Astrophysics Data System (ADS)

    Bazzill, Todd M.; Huang, H. K.; Thoma, George R.; Long, L. Rodney; Gill, Michael J.

    1996-05-01

    We are developing a wide area test bed network using the Advanced Communication Technology Satellite (ACTS) from NASA for high speed medical image transmission. The two test sites are the University of California, San Francisco, and the National Library of Medicine. The first phase of the test bed runs over a T1 link (1.544 Mbits/sec) using a Very Small Aperture Terminal. The second phase involves the High Data Rate Terminal via an ATM OC 3C (155 Mbits/sec) connection. This paper describes the experimental set up and some preliminary results from phase 1.

  3. Oklahoma Area Struck By Magnitude 5.0 Earthquake Imaged by NASA Satellite

    NASA Image and Video Library

    2016-11-08

    On Sunday, Nov. 6, 2016, at 7:44 p.m. local time, a magnitude 5.0 earthquake struck near the town of Cushing, Oklahoma. Numerous buildings were damaged by the temblor, but only a few minor injuries were reported. Cushing is home to one of the world's largest oil storage terminals; no damage was reported to the petroleum facilities. A star marks the epicenter of the earthquake,which occurred at a depth of 3.1 miles (5 kilometers). The image was acquired April 28, 2011, covers an area of 7 by 9 miles (11.4 by 14.5 kilometers), and is located at 36 degrees north, 96.8 degrees west. http://photojournal.jpl.nasa.gov/catalog/PIA21099

  4. XV-15 Tiltrotor Low Noise Terminal Area Operations

    NASA Technical Reports Server (NTRS)

    Conner, David A.; Marcolini, Michael A.; Edwards, Bryan D.; Brieger, John T.

    1998-01-01

    Acoustic data have been acquired for the XV-15 tiltrotor aircraft performing a variety of terminal area operating procedures. This joint NASA/Bell/Army test program was conducted in two phases. During Phase 1 the XV-15 was flown over a linear array of microphones, deployed perpendicular to the flight path, at a number of fixed operating conditions. This documented the relative noise differences between the various conditions. During Phase 2 the microphone array was deployed over a large area to directly measure the noise footprint produced during realistic approach and departure procedures. The XV-15 flew approach profiles that culminated in IGE hover over a landing pad, then takeoffs from the hover condition back out over the microphone array. Results from Phase 1 identify noise differences between selected operating conditions, while those from Phase 2 identify differences in noise footprints between takeoff and approach conditions and changes in noise footprint due to variation in approach procedures.

  5. The 2002 NASA Faculty Fellowship Program Research Reports

    NASA Technical Reports Server (NTRS)

    Bland, J. (Compiler)

    2003-01-01

    Contents include the following: System Identification of X-33. Neural Network Advanced Ceramic Technology for Space Applications at NASA MSFC. Developing a MATLAB-Based Tool for Visualization and Transformation. Subsurface Stress Fields in Single Crystal (Anisotropic). Contacts Our Space Future: A Challenge to the Conceptual Artist Concept Art for Presentation and Education. Identification and Characterization of Extremophile Microorganisms. Significant to Astrobiology. Mathematical Investigation of Gamma Ray and Neutron. Absorption Grid Patterns for Homeland Defense-Related Fourier Imaging Systems. The Potential of Microwave Radiation for Processing Martian Soil. Fuzzy Logic Trajectory Design and Guidance for Terminal Area.

  6. Enhanced networks operations using the X Window System

    NASA Technical Reports Server (NTRS)

    Linares, Irving

    1993-01-01

    We propose an X Window Graphical User Interface (GUI) which is tailored to the operations of NASA GSFC's Network Control Center (NCC), the NASA Ground Terminal (NGT), the White Sands Ground Terminal (WSGT), and the Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT). The proposed GUI can also be easily extended to other Ground Network (GN) Tracking Stations due to its standardized nature.

  7. Potential impacts of advanced aerodynamic technology on air transportation system productivity

    NASA Technical Reports Server (NTRS)

    Bushnell, Dennis M. (Editor)

    1994-01-01

    Summaries of a workshop held at NASA Langley Research Center in 1993 to explore the application of advanced aerodynamics to airport productivity improvement are discussed. Sessions included discussions of terminal area productivity problems and advanced aerodynamic technologies for enhanced high lift and reduced noise, emissions, and wake vortex hazard with emphasis upon advanced aircraft configurations and multidisciplinary solution options.

  8. Modeling Air Traffic Management Technologies with a Queuing Network Model of the National Airspace System

    NASA Technical Reports Server (NTRS)

    Long, Dou; Lee, David; Johnson, Jesse; Gaier, Eric; Kostiuk, Peter

    1999-01-01

    This report describes an integrated model of air traffic management (ATM) tools under development in two National Aeronautics and Space Administration (NASA) programs -Terminal Area Productivity (TAP) and Advanced Air Transport Technologies (AATT). The model is made by adjusting parameters of LMINET, a queuing network model of the National Airspace System (NAS), which the Logistics Management Institute (LMI) developed for NASA. Operating LMINET with models of various combinations of TAP and AATT will give quantitative information about the effects of the tools on operations of the NAS. The costs of delays under different scenarios are calculated. An extension of Air Carrier Investment Model (ACIM) under ASAC developed by the Institute for NASA maps the technologies' impacts on NASA operations into cross-comparable benefits estimates for technologies and sets of technologies.

  9. Proceedings of the NASA First Wake Vortex Dynamic Spacing Workshop

    NASA Technical Reports Server (NTRS)

    Creduer, Leonard (Editor); Perry, R. Brad (Editor)

    1997-01-01

    A Government and Industry workshop on wake vortex dynamic spacing systems was conducted on May 13-15, 1997, at the NASA Langley Research Center. The purpose of the workshop was to disclose the status of ongoing NASA wake vortex R&D to the international community and to seek feedback on the direction of future work to assure an optimized research approach. Workshop sessions examined wake vortex characterization and physics, wake sensor technologies, aircraft/wake encounters, terminal area weather characterization and prediction, and wake vortex systems integration and implementation. A final workshop session surveyed the Government and Industry perspectives on the NASA research underway and related international wake vortex activities. This document contains the proceedings of the workshop including the presenters' slides, the discussion following each presentation, the wrap-up panel discussion, and the attendees' evaluation feedback.

  10. Magnetic Suspension Technology Development

    NASA Technical Reports Server (NTRS)

    Britcher, Colin

    1998-01-01

    This Cooperative Agreement, intended to support focused research efforts in the area of magnetic suspension systems, was initiated between NASA Langley Research Center (LaRC) and Old Dominion University (ODU) starting January 1, 1997. The original proposal called for a three-year effort, but funding for the second year proved to be unavailable, leading to termination of the agreement following a 5-month no-cost extension. This report covers work completed during the entire 17-month period of the award. This research built on work that had taken place over recent years involving both NASA LARC and the Principal Investigator (PI). The research was of a rather fundamental nature, although specific applications were kept in mind at all times, such as wind tunnel Magnetic Suspension and Balance Systems (MSBS), space payload pointing and vibration isolation systems, magnetic bearings for unconventional applications, magnetically levitated ground transportation and electromagnetic launch systems. Fundamental work was undertaken in areas such as the development of optimized magnetic configurations, analysis and modelling of eddy current effects, control strategies for magnetically levitated wind tunnel models and system calibration procedures. Despite the termination of this Cooperative Agreement, several aspects of the research work are currently continuing with alternative forms of support.

  11. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Information from NASA's Tech Transfer Office is on display at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  12. Design of Center-TRACON Automation System

    NASA Technical Reports Server (NTRS)

    Erzberger, Heinz; Davis, Thomas J.; Green, Steven

    1993-01-01

    A system for the automated management and control of terminal area traffic, referred to as the Center-TRACON Automation System (CTAS), is being developed at NASA Ames Research Center. In a cooperative program, NASA and FAA have efforts underway to install and evaluate the system at the Denver area and Dallas/Ft. Worth area air traffic control facilities. This paper will review CTAS architecture, and automation functions as well as the integration of CTAS into the existing operational system. CTAS consists of three types of integrated tools that provide computer-generated advisories for both en-route and terminal area controllers to guide them in managing and controlling arrival traffic efficiently. One tool, the Traffic Management Advisor (TMA), generates runway assignments, landing sequences and landing times for all arriving aircraft, including those originating from nearby feeder airports. TMA also assists in runway configuration control and flow management. Another tool, the Descent Advisor (DA), generates clearances for the en-route controllers handling arrival flows to metering gates. The DA's clearances ensure fuel-efficient and conflict free descents to the metering gates at specified crossing times. In the terminal area, the Final Approach Spacing Tool (FAST) provides heading and speed advisories that help controllers produce an accurately spaced flow of aircraft on the final approach course. Data bases consisting of several hundred aircraft performance models, airline preferred operational procedures, and a three dimensional wind model support the operation of CTAS. The first component of CTAS, the Traffic Management Advisor, is being evaluated at the Denver TRACON and the Denver Air Route Traffic Control Center. The second component, the Final Approach Spacing Tool, will be evaluated in several stages at the Dallas/Fort Worth Airport beginning in October 1993. An initial stage of the Descent Advisor tool is being prepared for testing at the Denver Center in late 1994. Operational evaluations of all three integrated CTAS tools are expected to begin at the two field sites in 1995.

  13. Current and planned use of the Navstar Global Positioning System by NASA

    NASA Technical Reports Server (NTRS)

    Theiss, Harold L.

    1993-01-01

    NASA was quick to realize the potential that the Global Positioning System (GPS) had to offer for its many diverse vehicles, experiments and platforms. Soon after the first Block 1 GPS satellites were launched, NASA began to use the tremendous capabilities that they had to offer. Even with a partial GPS constellation in place, important results have been obtained about the shape, orientation and rotation of the earth and calibration of the ionosphere and troposphere. These calibrations enhance geophysical science and facilitate the navigation of interplanetary spacecraft. Some very important results have been obtained in the continuing NASA program for aircraft terminal area operations. Currently, a large amount of activity is being concentrated on real time kinematic carrier phase tracking which has the potential to revolutionize aircraft navigation. This year marks the launch of the first GPS receiver equipped earth-orbiting NASA spacecraft: the Extreme Ultraviolet Explorer and the Ocean Topography Experiment (TOPEX/Poseidon). This paper describes a cross section of GPS-based research at NASA.

  14. An Overview of a Trajectory-Based Solution for En Route and Terminal Area Self-Spacing: Third Revision

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.

    2012-01-01

    This paper presents an overview of the third major revision to an algorithm specifically designed to support NASA's Airborne Precision Spacing concept. This algorithm is referred to as the Airborne Spacing for Terminal Arrival Routes version 11 (ASTAR11). This airborne self-spacing concept is trajectory-based, allowing for spacing operations prior to the aircraft being on a common path. Because this algorithm is trajectory-based, it also has the inherent ability to support required time-of-arrival (RTA) operations. This algorithm was also designed specifically to support a standalone, non-integrated implementation in the spacing aircraft.

  15. NASA/ARMY/BELL XV-15 Tiltrotor Low-Noise Terminal Area Operations Flight Research Program

    NASA Technical Reports Server (NTRS)

    Edwards, Bryan D.; Conner, David A.; Decker, William A.; Marcolini, Michael A.; Klein, Peter D.

    2001-01-01

    To evaluate the noise reduction potential for tiltrotor aircraft, a series of three XV- 15 acoustic flight tests were conducted over a five-year period by a NASA/Army/Bell Helicopter team. Lower hemispherical noise characteristics for a wide range of steady-state terminal area type operating conditions were measured during the Phase I test and indicated that the takeoff and level flight conditions were not significant contributors to the total noise of tiltrotor operations. Phase I results were also used to design low-noise approach profiles that were tested later during the Phase 2 and Phase 3 tests. These latter phases used large area microphone arrays to directly measure ground noise footprints. Approach profiles emphasized noise reduction while maintaining handling qualities sufficient for tiltrotor commercial passenger ride comfort and flight safety under Instrument Flight Rules (IFR) conditions. This paper will discuss the weather, aircraft, tracking, guidance, and acoustic instrumentation systems, as well as the approach profile design philosophy, and the overall test program philosophy. Acoustic results are presented to document the variation in tiltrotor noise due to changes in operating condition, indicating the potential for significant noise reduction using the unique tiltrotor capability of nacelle tilt. Recommendations are made for a final XV-15 test to define the acoustic benefits of the automated approach capability which has recently been added to this testbed aircraft.

  16. Advanced Command Destruct System (ACDS) Enhanced Flight Termination System (EFTS)

    NASA Technical Reports Server (NTRS)

    Tow, David K.

    2011-01-01

    This presentation provides information on the development, integration, and operational usage of the Enhanced Flight Termination System (EFTS) at NASA Dryden Flight Research Center and Air Force Flight Test Center. The presentation will describe the efforts completed to certify the system and acquire approval for operational usage, the efforts to integrate the system into the NASA Dryden existing flight termination infrastructure, and the operational support of aircraft with EFTS at Edwards AFB.

  17. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees speak to representatives from NASA's Office of Small Business Programs during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  18. Quiet Short-Haul Research Aircraft Joint Navy/NASA Sea Trials

    NASA Technical Reports Server (NTRS)

    Queen, S.; Cochrane, J.

    1982-01-01

    The Quiet Short-Haul Research Aircraft (QSRA) is a flight facility which Ames Research Center is using to conduct a broad program of terminal area and low-speed, propulsive-life flight research. A joint Navy/NASA flight research program used the QSRA to investigate the application of advanced propulsive-lift technology to the naval aircraft-carrier environment. Flight performance of the QSRA is presented together with the results or the joint Navy/NASA flight program. During the joint program, the QSRA operated aboard the USS Kitty Hawk for 4 days, during which numerous unarrested landings and free deck takeoffs were accomplished. These operations demonstrated that a large aircraft incorporating upper-surface-blowing, propulsive-life technology can be operated in the aircraft-carrier environment without any unusual problems.

  19. Simulator Investigation of Pilot Aids for Helicopter Terminal Area Operations with One Engine Inoperative

    NASA Technical Reports Server (NTRS)

    Iseler, Laura; Chen, Robert; Dearing, Munro; Decker, William; Aiken, Edwin W. (Technical Monitor)

    1995-01-01

    Two recent piloted simulation experiments have investigated advanced display concepts applied to civil transport helicopter terminal area operations. Civil Category A helicopter operations apply to multi-engine helicopters wherein a safe recovery (land or fly out) is required in the event of a single engine failure. The investigation used the NASA Ames Research Center Vertical Motion Simulator, which has a full six degrees of freedom, to simulate the flight task as closely as possible. The goal of these experiments was to use advanced cockpit displays to improve flight safety and enhance the mission performance of Category A terminal area operations in confined areas. The first experiment investigated the use of military display formats to assist civil rotorcraft in performing a Category A takeoff in confined terminal areas. Specifically, it addressed how well a difficult hovering backup path could be followed using conventional instruments in comparison to panel mounted integrated displays. The hovering backup takeoff, which enables pilots to land back to the confined area pad in the event of an engine failure, was chosen since it is a difficult task to perform. Seven NASA and Army test pilots participated in the experiment. Evaluations, based on task performance and pilot workload, showed that an integrated display enabled the pilot to consistently achieve adequate or desired performance with reasonable pilot workload. Use of conventional instruments, however, frequently resulted in unacceptable performance (poor flight path tracking), higher pilot workload, and poor situational awareness. Although OEI landbacks were considered a visual task, the improved performance on the backup portion, in conjunction with increased situational awareness resulting from use of integrated displays, enabled the pilots to handle an engine failure and land back safely. In contrast, use of conventional instruments frequently led to excessive rates of sink at touchdown. A second simulation (in progress - July - August) is being conducted to investigate the use of advanced displays to perform vertical and short takeoffs and landings. One Engine Inoperative trajectories, which were optimized based on safety of flight restrictions, are utilized. Based on comments from the first experiment and further analytic development, appropriate fly out and approach guidance was added. Displays include conventional instruments with raw data, and the following integrated displays: multi-view and side-view hover displays based on the Apache Pilot Night Vision System, and variations of the pathway-in-the-sky displays with a flight-path-vector, a leader and flight director modifications. Panel mounted and head-up displays are being evaluated. Engine modifications have been incorporated to simulate 30 second and 2 minute contingency power ratings. Evaluations are based on task performance and pilot workload. NASA, Army, FAA, and industry test pilots participated. Details concerning the design, conduct, and the results of the experiment will be reported in the proposed paper.

  20. The astronomical data base and retrieval system at NASA

    NASA Technical Reports Server (NTRS)

    Mead, J. M.; Nagy, T. A.; Hill, R. S.; Warren, W. H., Jr.

    1982-01-01

    More than 250 machine-readable catalogs of stars and extended celestial objects are now available at the NASA/Goddard Space Flight Center (GSFC) as the result of over a decade of catalog acquisition, verification and documentation. Retrieval programs are described which permit the user to obtain from a remote terminal bibliographical listings for stars; to find all celestial objects from a given list that are within a defined angular separation from each object in another list; to plot celestial objects on overlays for sky survey plate areas; and to search selected catalogs for objects by criteria of position, identification number, magnitude or spectral type.

  1. Propagation Terminal Design and Measurements

    NASA Technical Reports Server (NTRS)

    Nessel, James

    2015-01-01

    The NASA propagation terminal has been designed and developed by the Glenn Research Center and is presently deployed at over 5 NASA and partner ground stations worldwide collecting information on the effects of the atmosphere on Ka-band and millimeter wave communications links. This lecture provides an overview of the fundamentals and requirements of the measurement of atmospheric propagation effects and, specifically, the types of hardware and digital signal processing techniques employed by current state-of-the-art propagation terminal systems.

  2. The Future of Air Traffic Management

    NASA Technical Reports Server (NTRS)

    Denery, Dallas G.; Erzberger, Heinz; Edwards, Thomas A. (Technical Monitor)

    1998-01-01

    A system for the control of terminal area traffic to improve productivity, referred to as the Center-TRACON Automation System (CTAS), is being developed at NASA's Ames Research Center under a joint program with the FAA. CTAS consists of a set of integrated tools that provide computer-generated advisories for en-route and terminal area controllers. The premise behind the design of CTAS has been that successful planning of traffic requires accurate trajectory prediction. Data bases consisting of representative aircraft performance models, airline preferred operational procedures and a three dimensional wind model support the trajectory prediction. The research effort has been the design of a set of automation tools that make use of this trajectory prediction capability to assist controllers in overall management of traffic. The first tool, the Traffic Management Advisor (TMA), provides the overall flow management between the en route and terminal areas. A second tool, the Final Approach Spacing Tool (FAST) provides terminal area controllers with sequence and runway advisories to allow optimal use of the runways. The TMA and FAST are now being used in daily operations at Dallas/Ft. Worth airport. Additional activities include the development of several other tools. These include: 1) the En Route Descent Advisor that assist the en route controller in issuing conflict free descents and ascents; 2) the extension of FAST to include speed and heading advisories and the Expedite Departure Path (EDP) that assists the terminal controller in management of departures; and 3) the Collaborative Arrival Planner (CAP) that will assist the airlines in operational decision making. The purpose of this presentation is to review the CTAS concept and to present the results of recent field tests. The paper will first discuss the overall concept and then discuss the status of the individual tools.

  3. Tracking and data relay satellite system - NASA's new spacecraft data acquisition system

    NASA Technical Reports Server (NTRS)

    Schneider, W. C.; Garman, A. A.

    1979-01-01

    This paper describes NASA's new spacecraft acquisition system provided by the Tracking and Data Relay Satellite System (TDRSS). Four satellites in geostationary orbit and a ground terminal will provide complete tracking, telemetry, and command service for all of NASA's orbital satellites below a 12,000 km altitude. Western Union will lease the system, operate the ground terminal and provide operational satellite control. NASA's network control center will be the focal point for scheduling user services and controlling the interface between TDRSS and the NASA communications network, project control centers, and data processing. TDRSS single access user spacecraft data systems will be designed for time shared data relay support, and reimbursement policy and rate structure for non-NASA users are being developed.

  4. 14 CFR 1214.108 - Termination.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NASA. (1) The termination fee for dedicated flights will be computed as a percentage of the Shuttle... Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.108 Termination... termination occurs Termination fee, percent of Shuttle standard flight price 18 or more 10 17 or more but less...

  5. 14 CFR 1214.108 - Termination.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NASA. (1) The termination fee for dedicated flights will be computed as a percentage of the Shuttle... Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.108 Termination... termination occurs Termination fee, percent of Shuttle standard flight price 18 or more 10 17 or more but less...

  6. 14 CFR 1214.108 - Termination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NASA. (1) The termination fee for dedicated flights will be computed as a percentage of the Shuttle... Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.108 Termination... termination occurs Termination fee, percent of Shuttle standard flight price 18 or more 10 17 or more but less...

  7. 14 CFR 1214.108 - Termination.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NASA. (1) The termination fee for dedicated flights will be computed as a percentage of the Shuttle... Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.108 Termination... termination occurs Termination fee, percent of Shuttle standard flight price 18 or more 10 17 or more but less...

  8. NASA/contractor partnership on the second TDRSS ground terminal program: Breaking barriers

    NASA Technical Reports Server (NTRS)

    Tierney, Paul G.

    1992-01-01

    The Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT) Program from its technical and programmatic backgrounds is introduced and then several techniques to enhance communication and empower the NASA Contractor team are described. A major factor in our success was an approach used to shorten the time span of the Critical Design Review phase. This approach is described. The relationships involving NASA's O&M contractor are discussed. A set of lessons learned is included.

  9. KSC-2012-5817

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – NASA Associate Administrator for the Office of Small Business Programs Glenn Delgado, right, speaks with exhibitors participating NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  10. Assessment of Delivery Accuracy in an Operational-Like Environment

    NASA Technical Reports Server (NTRS)

    Sharma, Shivanjli; Wynnyk, Mitch

    2016-01-01

    In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

  11. The Center-TRACON Automation System: Simulation and field testing

    NASA Technical Reports Server (NTRS)

    Denery, Dallas G.; Erzberger, Heinz

    1995-01-01

    A new concept for air traffic management in the terminal area, implemented as the Center-TRACON Automation System, has been under development at NASA Ames in a cooperative program with the FAA since 1991. The development has been strongly influenced by concurrent simulation and field site evaluations. The role of simulation and field activities in the development process will be discussed. Results of recent simulation and field tests will be presented.

  12. Identification and Analysis of National Airspace System Resource Constraints

    NASA Technical Reports Server (NTRS)

    Smith, Jeremy C.; Marien, Ty V.; Viken, Jeffery K.; Neitzke, Kurt W.; Kwa, Tech-Seng; Dollyhigh, Samuel M.; Fenbert, James W.; Hinze, Nicolas K.

    2015-01-01

    This analysis is the deliverable for the Airspace Systems Program, Systems Analysis Integration and Evaluation Project Milestone for the Systems and Portfolio Analysis (SPA) focus area SPA.4.06 Identification and Analysis of National Airspace System (NAS) Resource Constraints and Mitigation Strategies. "Identify choke points in the current and future NAS. Choke points refer to any areas in the en route, terminal, oceanic, airport, and surface operations that constrain actual demand in current and projected future operations. Use the Common Scenarios based on Transportation Systems Analysis Model (TSAM) projections of future demand developed under SPA.4.04 Tools, Methods and Scenarios Development. Analyze causes, including operational and physical constraints." The NASA analysis is complementary to a NASA Research Announcement (NRA) "Development of Tools and Analysis to Evaluate Choke Points in the National Airspace System" Contract # NNA3AB95C awarded to Logistics Management Institute, Sept 2013.

  13. Protocol Architecture Model Report

    NASA Technical Reports Server (NTRS)

    Dhas, Chris

    2000-01-01

    NASA's Glenn Research Center (GRC) defines and develops advanced technology for high priority national needs in communications technologies for application to aeronautics and space. GRC tasked Computer Networks and Software Inc. (CNS) to examine protocols and architectures for an In-Space Internet Node. CNS has developed a methodology for network reference models to support NASA's four mission areas: Earth Science, Space Science, Human Exploration and Development of Space (REDS), Aerospace Technology. This report applies the methodology to three space Internet-based communications scenarios for future missions. CNS has conceptualized, designed, and developed space Internet-based communications protocols and architectures for each of the independent scenarios. The scenarios are: Scenario 1: Unicast communications between a Low-Earth-Orbit (LEO) spacecraft inspace Internet node and a ground terminal Internet node via a Tracking and Data Rela Satellite (TDRS) transfer; Scenario 2: Unicast communications between a Low-Earth-Orbit (LEO) International Space Station and a ground terminal Internet node via a TDRS transfer; Scenario 3: Multicast Communications (or "Multicasting"), 1 Spacecraft to N Ground Receivers, N Ground Transmitters to 1 Ground Receiver via a Spacecraft.

  14. NASA work unit system users manual

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles to indicate how much effort is being expended to what types of research, where the effort is being expended, and how funds are being distributed. The user obtains information by entering requests on the keyboard of a time-sharing terminal. Responses are received as video displays or typed messages at the terminal, or as lists printed in the computer room for subsequent delivery by messenger.

  15. Proposal for a Joint NASA/KSAT Ka-band RF Propagation Terminal at Svalbard, Norway

    NASA Technical Reports Server (NTRS)

    Volosin, Jeffrey; Acosta, Roberto; Nessel, James; McCarthy, Kevin; Caroglanian, Armen

    2010-01-01

    This slide presentation discusses the placement of a Ka-band RF Propagation Terminal at Svalbard, Norway. The Near Earth Network (NEN) station would be managed by Kongsberg Satellite Services (KSAT) and would benefit NASA and KSAT. There are details of the proposed NASA/KSAT campaign, and the responsibilities each would agree to. There are several reasons for the placement, a primary reason is comparison with the Alaska site, Based on climatological similarities/differences with Alaska, Svalbard site expected to have good radiometer/beacon agreement approximately 99% of time.

  16. Runway Safety Monitor Algorithm for Runway Incursion Detection and Alerting

    NASA Technical Reports Server (NTRS)

    Green, David F., Jr.; Jones, Denise R. (Technical Monitor)

    2002-01-01

    The Runway Safety Monitor (RSM) is an algorithm for runway incursion detection and alerting that was developed in support of NASA's Runway Incursion Prevention System (RIPS) research conducted under the NASA Aviation Safety Program's Synthetic Vision System element. The RSM algorithm provides pilots with enhanced situational awareness and warnings of runway incursions in sufficient time to take evasive action and avoid accidents during landings, takeoffs, or taxiing on the runway. The RSM currently runs as a component of the NASA Integrated Display System, an experimental avionics software system for terminal area and surface operations. However, the RSM algorithm can be implemented as a separate program to run on any aircraft with traffic data link capability. The report documents the RSM software and describes in detail how RSM performs runway incursion detection and alerting functions for NASA RIPS. The report also describes the RIPS flight tests conducted at the Dallas-Ft Worth International Airport (DFW) during September and October of 2000, and the RSM performance results and lessons learned from those flight tests.

  17. Oil Fires in Libya

    NASA Image and Video Library

    2016-01-28

    The oil refinery fires in Libya that were started by attacks on oil terminals in Libya in very early January continue. The stream of black smoke that emanates from the refinery has grown tremendously as the fires caused by the initial shelling have spread to giant storage tanks. These fires are reported to be raging in Sidra, on the coast between Sirte and Benghazi. Actively burning areas, detected by MODIS’s thermal bands, are outlined in red. The initial image of the fires taken on January 07, 2016 can be found here for comparison: www.nasa.gov/image-feature/goddard/2016/terra-captures-im... NASA image courtesy Jeff Schmaltz, MODIS Rapid Response Team NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  18. Guidelines for the air-sea interaction special study: An element of the NASA climate research program, JPL/SIO workshop report

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A program in the area of air sea interactions is introduced. A space capability is discussed for global observations of climate parameters which will contribute to the understanding of the processes which influence climate and its predictability. The following recommendations are some of the suggestions made for air sea interaction studies: (1) a major effort needs to be devoted to the preparation of space based climatic data sets; (2) NASA should create a group or center for climatic data analysis due to the substantial long term effort that is needed in research and development; (3) funding for the analyses of existing data sets should be augmented and continued beyond the termination of present programs; (4) NASA should fund studies in universities, research institutions and governments' centers; and (5) the planning for an air sea interaction mission should be an early task.

  19. 48 CFR 1819.7210 - Agreement terminations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Agreement terminations... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7210 Agreement terminations. (a) Agreements may be terminated for cause or on a voluntary basis by the mentor or the protégé...

  20. Commercialization and Standardization Progress Towards an Optical Communications Earth Relay

    NASA Technical Reports Server (NTRS)

    Edwards, Bernard L.; Israel, David J.

    2015-01-01

    NASA is planning to launch the next generation of a space based Earth relay in 2025 to join the current Space Network, consisting of Tracking and Data Relay Satellites in space and the corresponding infrastructure on Earth. While the requirements and architecture for that relay satellite are unknown at this time, NASA is investing in communications technologies that could be deployed to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in 2018 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the next generation space based relay. This paper will describe NASA efforts in the on-going commercialization of optical communications and the development of inter-operability standards. Both are seen as critical to making optical communications a reality on future NASA science and exploration missions. Commercialization is important because NASA would like to eventually be able to simply purchase an entire optical communications terminal from a commercial provider. Inter-operability standards are needed to ensure that optical communications terminals developed by one vendor are compatible with the terminals of another. International standards in optical communications would also allow the space missions of one nation to use the infrastructure of another.

  1. Laser data transfer flight experiment definition

    NASA Technical Reports Server (NTRS)

    Merritt, J. R.

    1975-01-01

    A set of laser communication flight experiments to be performed between a relay satellite, ground terminals, and space shuttles were synthesized and evaluated. Results include a definition of the space terminals, NASA ground terminals, test methods, and test schedules required to perform the experiments.

  2. KSC-2012-5829

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  3. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Exhibitors answer questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  4. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    An exhibitor answers questions at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  5. KSC-2012-5815

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  6. KSC-2012-5828

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  7. KSC-2012-5818

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  8. KSC-2012-5814

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  9. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    Attendees visit exhibitor booths at Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  10. A summary of joint US-Canadian augmentor wing powered-lift STOL research programs at the Ames Research Center, NASA, 1975-1980

    NASA Technical Reports Server (NTRS)

    Hindson, W. S.; Hardy, G.

    1980-01-01

    Several different flight research programs carried out by NASA and the Canadian Government using the Augmentor Wing Jet STOL Research Aircraft to investigate the design, operational, and systems requirements for powered-lift STOL aircraft are summarized. Some of these programs considered handling qualities and certification criteria for this class of aircraft, and addressed pilot control techniques, control system design, and improved cockpit displays for the powered-lift STOL approach configuration. Other programs involved exploiting the potential of STOL aircraft for constrained terminal-area approaches within the context of present or future air traffic control environments. Both manual and automatic flight control investigations are discussed, and an extensive bibliography of the flight programs is included.

  11. KSC-2012-5819

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  12. KSC-2012-5822

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  13. KSC-2012-5824

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  14. KSC-2012-5827

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  15. KSC-2012-5826

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  16. KSC-2012-5821

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  17. KSC-2012-5820

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  18. KSC-2012-5816

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  19. KSC-2012-5825

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – Local business representatives attended NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  20. Command and Control of Space Assets Through Internet-Based Technologies Demonstrated

    NASA Technical Reports Server (NTRS)

    Foltz, David A.

    2002-01-01

    The NASA Glenn Research Center successfully demonstrated a transmission-control-protocol/ Internet-protocol- (TCP/IP) based approach to the command and control of onorbit assets over a secure network. This is a significant accomplishment because future NASA missions will benefit by using Internet-standards-based protocols. Benefits of this Internet-based space command and control system architecture include reduced mission costs and increased mission efficiency. The demonstration proved that this communications architecture is viable for future NASA missions. This demonstration was a significant feat involving multiple NASA organizations and industry. Phillip Paulsen, from Glenn's Project Development and Integration Office, served as the overall project lead, and David Foltz, from Glenn's Satellite Networks and Architectures Branch, provided the hybrid networking support for the required Internet connections. The goal was to build a network that would emulate a connection between a space experiment on the International Space Station and a researcher accessing the experiment from anywhere on the Internet, as shown. The experiment was interfaced to a wireless 802.11 network inside the demonstration area. The wireless link provided connectivity to the Tracking and Data Relay Satellite System (TDRSS) Internet Link Terminal (TILT) satellite uplink terminal located 300 ft away in a parking lot on top of a panel van. TILT provided a crucial link in this demonstration. Leslie Ambrose, NASA Goddard Space Flight Center, provided the TILT/TDRSS support. The TILT unit transmitted the signal to TDRS 6 and was received at the White Sands Second TDRSS Ground Station. This station provided the gateway to the Internet. Coordination also took place at the White Sands station to install a Veridian Firewall and automated security incident measurement (ASIM) system to the Second TDRSS Ground Station Internet gateway. The firewall provides a trusted network for the simulated space experiment. A second Internet connection at the demonstration area was implemented to provide Internet connectivity to a group of workstations to serve as platforms for controlling the simulated space experiment. Installation of this Internet connection was coordinated with an Internet service provider (ISP) and local NASA Johnson Space Center personnel. Not only did this TCP/IP-based architecture prove that a principal investigator on the Internet can securely command and control on-orbit assets, it also demonstrated that valuable virtual testing of planned on-orbit activities can be conducted over the Internet prior to actual deployment in space.

  1. Advanced Command Destruct System (ACDS) Enhanced Flight Termination System (EFTS)

    NASA Technical Reports Server (NTRS)

    Tow, David

    2009-01-01

    NASA Dryden started working towards a single vehicle enhanced flight termination system (EFTS) in January 2008. NASA and AFFTC combined their efforts to work towards final operating capability for multiple vehicle and multiple missions simultaneously, to be completed by the end of 2011. Initially, the system was developed to support one vehicle and one frequency per mission for unmanned aerial vehicles (UAVs) at NASA Dryden. By May 2008 95% of design and hardware builds were completed, however, NASA Dryden's change of software safety scope and requirements caused delays after May 2008. This presentation reviews the initial and final operating capabilities for the Advanced Command Destruct System (ACDS), including command controller and configuration software development. A requirements summary is also provided.

  2. Terminal Area Productivity Airport Wind Analysis and Chicago O'Hare Model Description

    NASA Technical Reports Server (NTRS)

    Hemm, Robert; Shapiro, Gerald

    1998-01-01

    This paper describes two results from a continuing effort to provide accurate cost-benefit analyses of the NASA Terminal Area Productivity (TAP) program technologies. Previous tasks have developed airport capacity and delay models and completed preliminary cost benefit estimates for TAP technologies at 10 U.S. airports. This task covers two improvements to the capacity and delay models. The first improvement is the completion of a detailed model set for the Chicago O'Hare (ORD) airport. Previous analyses used a more general model to estimate the benefits for ORD. This paper contains a description of the model details with results corresponding to current conditions. The second improvement is the development of specific wind speed and direction criteria for use in the delay models to predict when the Aircraft Vortex Spacing System (AVOSS) will allow use of reduced landing separations. This paper includes a description of the criteria and an estimate of AVOSS utility for 10 airports based on analysis of 35 years of weather data.

  3. Tracking and data relay satellite system: NASA's new spacecraft data acquisition system

    NASA Astrophysics Data System (ADS)

    Schneider, W. C.; Garman, A. A.

    The growth in NASA's ground network complexity and cost triggered a search for an alternative. Through a lease service contract, Western Union will provide to NASA 10 years of space communications services with a Tracking and Data Relay Satellite System (TDRSS). A constellation of four operating satellites in geostationary orbit and a single ground terminal will provide complete tracking, telemetry and command service for all of NASA's Earth orbital satellites below an altitude of 12,000 km. The system is shared: two satellites will be dedicated to NASA service; a third will provide backup as a shared spare; the fourth satellite will be dedicated to Western Union's Advanced Westar commercial service. Western Union will operate the ground terminal and provide operational satellite control. NASA's Network Control Center will provide the focal point for scheduling user services and controlling the interface between TDRSS and the rest of the NASA communications network, project control centers and data processing facilities. TDRSS single access user spacecraft data systems should be designed for efficient time shared data relay support. Reimbursement policy and rate structure for non-NASA users are currently being developed.

  4. An Overview of a Trajectory-Based Solution for En Route and Terminal Area Self-Spacing: Sixth Revision

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.

    2015-01-01

    This paper presents an overview of the sixth revision to an algorithm specifically designed to support NASA's Airborne Precision Spacing concept. This algorithm is referred to as the Airborne Spacing for Terminal Arrival Routes version 13 (ASTAR13). This airborne self-spacing concept contains both trajectory-based and state-based mechanisms for calculating the speeds required to achieve or maintain a precise spacing interval. The trajectory-based capability allows for spacing operations prior to the aircraft being on a common path. This algorithm was also designed specifically to support a standalone, non-integrated implementation in the spacing aircraft. This current revision to the algorithm adds the state-based capability in support of evolving industry standards relating to airborne self-spacing.

  5. Advanced symbology for general aviation approach to landing displays

    NASA Technical Reports Server (NTRS)

    Bryant, W. H.

    1983-01-01

    A set of flight tests designed to evaluate the relative utility of candidate displays with advanced symbology for general aviation terminal area instrument flight rules operations are discussed. The symbology was previously evaluated as part of the NASA Langley Research Center's Terminal Configured Vehicle Program for use in commercial airlines. The advanced symbology included vehicle track angle, flight path angle and a perspective representation of the runway. These symbols were selectively drawn on a cathode ray tube (CRT) display along with the roll attitude, pitch attitude, localizer deviation and glideslope deviation. In addition to the CRT display, the instrument panel contained standard turn and bank, altimeter, rate of climb, airspeed, heading, and engine instruments. The symbology was evaluated using tracking performance and pilot subjective ratings for an instrument landing system capture and tracking task.

  6. NASA Low Visibility Landing and Surface Operations (LVLASO) Atlanta Demonstration: Surveillance Systems Performance Analysis

    NASA Technical Reports Server (NTRS)

    Cassell, Rick; Evers, Carl; Hicok, Dan; Lee, Derrick

    1999-01-01

    NASA conducted a series of flight experiments at Hartsfield Atlanta International Airport as part of the Low Visibility Landing and Surface Operations (LVLASO) Program. LVLASO is one of the subelements of the NASA Terminal Area Productivity (TAP) Program, which is focused on providing technology and operating procedures for achieving clear-weather airport capacity in instrument-weather conditions, while also improving safety. LVLASO is investigating various technologies to be applied to airport surface operations, including advanced flight deck displays and surveillance systems. The purpose of this report is to document the performance of the surveillance systems tested as part of the LVLASO flight experiment. There were three surveillance sensors tested: primary radar using Airport Surface Detection Equipment (ASDE-3) and the Airport Movement Area Safety System (AMASS), Multilateration using the Airport Surface Target Identification System (ATIDS), and Automatic Dependent Surveillance - Broadcast (ADS-B) operating at 1090 MHz. The performance was compared to the draft requirements of the ICAO Advanced Surface Movement Guidance and Control System (A-SMGCS). Performance parameters evaluated included coverage, position accuracy, and update rate. Each of the sensors was evaluated as a stand alone surveillance system.

  7. ACTS propagation experiment discussion: Ka-band propagation measurements using the ACTS propagation terminal and the CSU-CHILL and Space Communications Technology Center Florida propagation program

    NASA Technical Reports Server (NTRS)

    Bringi, V. N.; Chandrasekar, V.; Mueller, Eugene A.; Turk, Joseph; Beaver, John; Helmken, Henry F.; Henning, Rudy

    1993-01-01

    Papers on Ka-band propagation measurements using the ACTS propagation terminal and the Colorado State University CHILL multiparameter radar and on Space Communications Technology Center Florida Propagation Program are discussed. Topics covered include: microwave radiative transfer and propagation models; NASA propagation terminal status; ACTS channel characteristics; FAU receive only terminal; FAU terminal status; and propagation testbed.

  8. NASA Aircraft Vortex Spacing System Development Status

    NASA Technical Reports Server (NTRS)

    Hinton, David A.; Charnock, James K.; Bagwell, Donald R.; Grigsby, Donner

    1999-01-01

    The National Aeronautics and Space Administration (NASA) is addressing airport capacity enhancements during instrument meteorological conditions through the Terminal Area Productivity (TAP) program. Within TAP, the Reduced Spacing Operations (RSO) subelement at the NASA Langley Research Center is developing an Aircraft VOrtex Spacing System (AVOSS). AVOSS will integrate the output of several systems to produce weather dependent, dynamic wake vortex spacing criteria. These systems provide current and predicted weather conditions, models of wake vortex transport and decay in these weather conditions, and real-time feedback of wake vortex behavior from sensors. The goal of the NASA program is to provide the research and development to demonstrate an engineering model AVOSS in real-time operation at a major airport. The demonstration is only of concept feasibility, and additional effort is required to deploy an operational system for actual aircraft spacing reduction. This paper describes the AVOSS system architecture, a wake vortex facility established at the Dallas-Fort Worth International Airport (DFW), initial operational experience with the AVOSS system, and emerging considerations for subsystem requirements. Results of the initial system operation suggest a significant potential for reduced spacing.

  9. Assessment of Emerging Networks to Support Future NASA Space Operations

    NASA Technical Reports Server (NTRS)

    Younes, Badri; Chang, Susan; Berman, Ted; Burns, Mark; LaFontaine, Richard; Lease, Robert

    1998-01-01

    Various issues associated with assessing emerging networks to support future NASA space operations are presented in viewgraph form. Specific topics include: 1) Emerging commercial satellite systems; 2) NASA LEO satellite support through commercial systems; 3) Communications coverage, user terminal assessment and regulatory assessment; 4) NASA LEO missions overview; and 5) Simulation assumptions and results.

  10. Terminal - Tactical Separation Assured Flight Environment (T-TSafe)

    NASA Technical Reports Server (NTRS)

    Verma, Savita Arora; Tang, Huabin; Ballinger, Debbi

    2011-01-01

    The Tactical Separation Assured Flight Environment (TSAFE) has been previously tested as a conflict detection and resolution tool in the en-route phase of flight. Fast time simulations of a terminal version of this tool called Terminal TSAFE (T-TSAFE) have shown promise over the current conflict detection tools. It has shown to have fewer false alerts (as low as 2 per hour) and better prediction to conflict time than Conflict Alert. The tool will be tested in the simulated terminal area of Los Angeles International Airport, in a Human-in-the-loop experiment to identify controller procedures and information requirements. The simulation will include comparisons of T-TSAFE with NASA's version of Conflict Alert. Also, some other variables such as altitude entry by the controller, which improve T-TSAFE's predictions for conflict detection, will be tested. T-TSAFE integrates features of current conflict detection tools such as Automated Terminal Proximity Alert used to alleviate compression errors in the final approach phase. Based on fast-time simulation analysis, the anticipated benefits of T-TSAFE over Conflict Alert include reduced false/missed alerts and increased time to predicted loss of separation. Other metrics that will be used to evaluate the tool's impact on the controller include controller intervention, workload, and situation awareness.

  11. ACTS Propagation Measurements in Maryland and Virginia

    NASA Technical Reports Server (NTRS)

    Dissanayake, Asoka; Lin, Kuan-Ting

    1996-01-01

    Rapid growth in new satellite services incorporating very small aperture terminals (VSAT) and ultra small aperture terminals (USAT) is expected in the coming years. Small size terminals allow for widespread use of satellite services in small business and domestic applications. Due to congestion of lower frequency bands such as C and Ku, most of these services will use Ka-band (2/20 GHz) frequencies. Propagation impairments produced by the troposphere is a limiting factor for the effective use of the 20/30 GHz band and the use of smaller Earth terminals makes it difficult to provide sufficient link margins for propagation related outages. In this context, reliable prediction of propagation impairments for low margin systems becomes important. Due to the complexity of propagation phenomena propagation modeling is mainly attempted on an empirical basis. As such, the availability of reliable measured data that extend to probability levels well in excess of the traditional limit of 1 percent is of great importance in the development, validation, and refinement of propagation models. The beacon payload on the Advanced Communications Technology Satellite (ACTS) together with the propagation measurement terminals developed under the NASA ACTS propagation program provide an excellent opportunity to collect such data on a long-term basis. This paper presents the results of ACTS propagation measurements conducted in the Washington, DC metropolitan area by COMSAT Laboratories.

  12. KSC-2012-5823

    NASA Image and Video Library

    2012-10-16

    PORT CANAVERAL, Fla. – U.S. Rep. Bill Posey R-Rockledge, right, speaks with an exhibitor participating NASA's Historically Underutilized Business Zone, or HUBZone, Industry Day and Expo 2012 on Oct. 16. Exhibitors included vendors from product and service areas, such as engineering services, computer technology, communication equipment and services, and construction and safety products. The event was hosted for business leaders who are interested in learning about government contracting opportunities and what local and national vendors have to offer. The expo was held in Cruise Terminal 4 at Port Canaveral, Fla. The annual trade show is sponsored by Kennedy's Prime Contractor Board, the U.S. Air Force 45th Space Wing and the Canaveral Port Authority. It featured about 175 large and small businesses and government exhibitors from Brevard County and across the nation. Photo credit: NASA/ Kim Shiflett

  13. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    John Murray, chief executive officer of the Canaveral Port Authority, welcomes participants to the Kennedy Space Center's 27th Business Opportunities Expo at Cruise Terminal 5 at Port Canaveral in Florida. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  14. Densely Cratered Terrain Near the Terminator

    NASA Image and Video Library

    2011-08-16

    NASA Dawn spacecraft shows densely cratered terrain near Vesta terminator on August 6, 2011. This image was taken through the framing camera clear filter aboard the spacecraft. North is pointing towards the two oclock position.

  15. Coherent Pulsed Lidar Sensing of Wake Vortex Position and Strength, Winds and Turbulence in the Terminal Area

    NASA Technical Reports Server (NTRS)

    Brockman, Philip; Barker, Ben C., Jr.; Koch, Grady J.; Nguyen, Dung Phu Chi; Britt, Charles L., Jr.; Petros, Mulugeta

    1999-01-01

    NASA Langley Research Center (LaRC) has field tested a 2.0 gm, 100 Hertz, pulsed coherent lidar to detect and characterize wake vortices and to measure atmospheric winds and turbulence. The quantification of aircraft wake-vortex hazards is being addressed by the Wake Vortex Lidar (WVL) Project as part of Aircraft Vortex Spacing System (AVOSS), which is under the Reduced Spacing Operations Element of the Terminal Area Productivity (TAP) Program. These hazards currently set the minimum, fixed separation distance between two aircraft and affect the number of takeoff and landing operations on a single runway under Instrument Meteorological Conditions (IMC). The AVOSS concept seeks to safely reduce aircraft separation distances, when weather conditions permit, to increase the operational capacity of major airports. The current NASA wake-vortex research efforts focus on developing and validating wake vortex encounter models, wake decay and advection models, and wake sensing technologies. These technologies will be incorporated into an automated AVOSS that can properly select safe separation distances for different weather conditions, based on the aircraft pair and predicted/measured vortex behavior. The sensor subsystem efforts focus on developing and validating wake sensing technologies. The lidar system has been field-tested to provide real-time wake vortex trajectory and strength data to AVOSS for wake prediction verification. Wake vortices, atmospheric winds, and turbulence products have been generated from processing the lidar data collected during deployments to Norfolk (ORF), John F. Kennedy (JFK), and Dallas/Fort Worth (DFW) International Airports.

  16. Channel and terminal description of the ACTS mobile terminal

    NASA Technical Reports Server (NTRS)

    Abbe, B. S.; Agan, M. J.; Girardey, C. C.; Jedrey, T. C.

    1994-01-01

    The Advanced Communications Technology Satellite (ACTS) Mobile Terminal (AMT) is a proof-of-concept K/Ka-band mobile satellite communications terminal under development by NASA at JPL. Currently the AMT is undergoing systems integration and testing in preparation for a July 1993 ACTS launch and the subsequent commencement of mobile experiments in the fall of 1993. The AMT objectives are presented, followed by a discussion of the AMT communications channel and the mobile terminal's design and performance.

  17. Channel and terminal description of the ACTS mobile terminal

    NASA Technical Reports Server (NTRS)

    Abbe, B. S.; Agan, M. J.; Girardey, C. C.; Jedrey, T. C.

    1993-01-01

    The Advanced Communications Technology Satellite (ACTS) Mobile Terminal (AMT) is a proof-of-concept K/Ka-band mobile satellite communications terminal under development by NASA at JPL. Currently the AMT is undergoing system integration and test in preparation for a July 1993 ACTS launch and the subsequent commencement of mobile experiments in the fall of 1993. The AMT objectives are presented followed by a discussion of the AMT communications channel and mobile terminal design and performance.

  18. Reliability Block Diagram (RBD) Analysis of NASA Dryden Flight Research Center (DFRC) Flight Termination System and Power Supply

    NASA Technical Reports Server (NTRS)

    Morehouse, Dennis V.

    2006-01-01

    In order to perform public risk analyses for vehicles containing Flight Termination Systems (FTS), it is necessary for the analyst to know the reliability of each of the components of the FTS. These systems are typically divided into two segments; a transmitter system and associated equipment, typically in a ground station or on a support aircraft, and a receiver system and associated equipment on the target vehicle. This analysis attempts to analyze the reliability of the NASA DFRC flight termination system ground transmitter segment for use in the larger risk analysis and to compare the results against two established Department of Defense availability standards for such equipment.

  19. Termination of flat conductor cable to NASA/MSFC plugs

    NASA Technical Reports Server (NTRS)

    Angele, W.

    1972-01-01

    Data, supplemented with artwork, are presented on the major steps involved with terminating flat conductor cable (FCC) to MSFC's FCC plugs. Cable and shield preparation steps include material cutting, insulation stripping, and plating of exposed conductors. Methods and equipment required to terminate FCC to each of four MSFC plugs are described.

  20. Dark Bands on Europa

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Dark crisscrossing bands on Jupiter's moon Europa represent widespread disruption from fracturing and the possible eruption of gases and rocky material from the moon's interior in this four-frame mosaic of images from NASA's Galileo spacecraft. These and other features suggest that soft ice or liquid water was present below the ice crust at the time of disruption. The data do not rule out the possibility that such conditions exist on Europa today. The pictures were taken from a distance of 156,000 kilometers (about 96,300 miles) on June 27, 1996. Many of the dark bands are more than 1,600 kilometers (1,000 miles) long, exceeding the length of the San Andreas fault of California. Some of the features seen on the mosaic resulted from meteoritic impact, including a 30- kilometer (18.5 mile) diameter crater visible as a bright scar in the lower third of the picture. In addition, dozens of shallow craters seen in some terrains along the sunset terminator zone (upper right shadowed area of the image) are probably impact craters. Other areas along the terminator lack craters, indicating relatively youthful surfaces, suggestive of recent eruptions of icy slush from the interior. The lower quarter of the mosaic includes highly fractured terrain where the icy crust has been broken into slabs as large as 30 kilometers (18.5 miles) across. The mosaic covers a large part of the northern hemisphere and includes the north pole at the top of the image. The sun illuminates the surface from the left. The area shown is centered on 20 degrees north latitude and 220 degrees west longitude and is about as wide as the United States west of the Mississippi River. The Galileo mission is managed by NASA's Jet Propulsion Laboratory.

  1. KSC-08pd1162

    NASA Image and Video Library

    2008-05-06

    CAPE CANAVERAL, Fla. -- Back at the NASA Kennedy Space Center Shuttle Landing Facility, STS-124 Commander Mark Kelly happily crosses the parking area after the successful space shuttle landing practice aboard NASA's Shuttle Training Aircraft, or STA. The STA is a Grumman American Aviation-built Gulf Stream II jet that was modified to simulate an orbiter's cockpit, motion and visual cues, and handling qualities. In flight, the STA duplicates the orbiter's atmospheric descent trajectory from approximately 35,000 feet altitude to landing on a runway. Because the orbiter is unpowered during re-entry and landing, its high-speed glide must be perfectly executed the first time. The crew for space shuttle Discovery's STS-124 mission is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test, or TCDT. Providing astronauts and ground crews with an opportunity to participate in various simulated countdown activities, TCDT includes equipment familiarization and emergency training. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  2. KSC-2010-1325

    NASA Image and Video Library

    2010-01-20

    CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission take time out from their training to pose for a group portrait with space shuttle Endeavour as backdrop. From left are Mission Specialists Stephen Robinson and Nicholas Patrick, Commander George Zamka, Mission Specialist Kathryn Hire, Pilot Terry Virts and Mission Specialist Robert Behnken. The crew members of space shuttle Endeavour's upcoming mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. Endeavour's launch is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Kim Shiflett

  3. KSC-2010-1334

    NASA Image and Video Library

    2010-01-20

    CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission pose for a group portrait following a question-and-answer session with the media. From left are Commander George Zamka; Pilot Terry Virts; and Mission Specialists Kathryn Hire, Stephen Robinson, Nicholas Patrick and Robert Behnken. The crew members of space shuttle Endeavour's upcoming mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. Endeavour's launch is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Kim Shiflett

  4. An Overview of a Trajectory-Based Solution for En Route and Terminal Area Self-Spacing: Seventh Revision

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.

    2015-01-01

    This paper presents an overview of the seventh revision to an algorithm specifically designed to support NASA's Airborne Precision Spacing concept. This paper supersedes the previous documentation and presents a modification to the algorithm referred to as the Airborne Spacing for Terminal Arrival Routes version 13 (ASTAR13). This airborne self-spacing concept contains both trajectory-based and state-based mechanisms for calculating the speeds required to achieve or maintain a precise spacing interval. The trajectory-based capability allows for spacing operations prior to the aircraft being on a common path. This algorithm was also designed specifically to support a standalone, non-integrated implementation in the spacing aircraft. This current revision to the algorithm adds the state-based capability in support of evolving industry standards relating to airborne self-spacing.

  5. An Overview of a Trajectory-Based Solution for En Route and Terminal Area Self-Spacing: Eighth Revision

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.; Swieringa, Kurt S.

    2017-01-01

    This paper presents an overview of the eighth revision to an algorithm specifically designed to support NASA's Airborne Precision Spacing concept. This paper supersedes the previous documentation and presents a modification to the algorithm referred to as the Airborne Spacing for Terminal Arrival Routes version 13 (ASTAR13). This airborne self-spacing concept contains both trajectory-based and state-based mechanisms for calculating the speeds required to achieve or maintain a precise spacing interval with another aircraft. The trajectory-based capability allows for spacing operations prior to the aircraft being on a common path. This algorithm was also designed specifically to support a standalone, non-integrated implementation in the spacing aircraft. This current revision to the algorithm supports the evolving industry standards relating to airborne self-spacing.

  6. The status of optical communications at NASA/JPL

    NASA Technical Reports Server (NTRS)

    Hemmati, H.

    2001-01-01

    Future NASA and commercial space missions will require communications terminals to provide higher data rate with lower mass and power. Optical communications is a rapidly developing technology in response to this demand.

  7. NextGen Technologies on the FAA's Standard Terminal Automation Replacement System

    NASA Technical Reports Server (NTRS)

    Witzberger, Kevin; Swenson, Harry; Martin, Lynne; Lin, Melody; Cheng, Jinn-Hwei

    2014-01-01

    This paper describes the integration, evaluation, and results from a high-fidelity human-in-the-loop (HITL) simulation of key NASA Air Traffic Management Technology Demonstration - 1 (ATD- 1) technologies implemented in an enhanced version of the FAA's Standard Terminal Automation Replacement System (STARS) platform. These ATD-1 technologies include: (1) a NASA enhanced version of the FAA's Time-Based Flow Management, (2) a NASA ground-based automation technology known as controller-managed spacing (CMS), and (3) a NASA advanced avionics airborne technology known as flight-deck interval management (FIM). These ATD-1 technologies have been extensively tested in large-scale HITL simulations using general-purpose workstations to study air transportation technologies. These general purpose workstations perform multiple functions and are collectively referred to as the Multi-Aircraft Control System (MACS). Researchers at NASA Ames Research Center and Raytheon collaborated to augment the STARS platform by including CMS and FIM advisory tools to validate the feasibility of integrating these automation enhancements into the current FAA automation infrastructure. NASA Ames acquired three STARS terminal controller workstations, and then integrated the ATD-1 technologies. HITL simulations were conducted to evaluate the ATD-1 technologies when using the STARS platform. These results were compared with the results obtained when the ATD-1 technologies were tested in the MACS environment. Results collected from the numerical data show acceptably minor differences, and, together with the subjective controller questionnaires showing a trend towards preferring STARS, validate the ATD-1/STARS integration.

  8. An Overview of a Trajectory-Based Solution for En Route and Terminal Area Self-Spacing to Include Parallel Runway Operations

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.

    2011-01-01

    This paper presents an overview of an algorithm specifically designed to support NASA's Airborne Precision Spacing concept. This airborne self-spacing concept is trajectory-based, allowing for spacing operations prior to the aircraft being on a common path. This implementation provides the ability to manage spacing against two traffic aircraft, with one of these aircraft operating to a parallel dependent runway. Because this algorithm is trajectory-based, it also has the inherent ability to support required-time-of-arrival (RTA) operations

  9. Satellite communication for public services

    NASA Technical Reports Server (NTRS)

    Cooper, R. S.; Redisch, W. N.

    1977-01-01

    Public service programs using NASA's ATS-6 and CTS satellites are discussed. Examples include the ATS-6 Health and Education Telecommunications experimental program and the use of CTS to enable students in one university to take courses presented at another distant university. Possible applications of satellite communication systems to several areas of public service are described, and economic and political obstacles hindering the implementation of these programs are considered. It is suggested that a federally sponsored program demonstrating the utility of satellites accomodating a large number of small terminals is needed to encourage commercial satellite operations.

  10. Acceptability of Flight Deck-Based Interval Management Crew Procedures

    NASA Technical Reports Server (NTRS)

    Murdock, Jennifer L.; Wilson, Sara R.; Hubbs, Clay E.; Smail, James W.

    2013-01-01

    The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Next Generation Air Transportation System (NextGen) Airspace Systems Program's Air Traffic Management Technology Demonstration - 1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using NextGen surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IM-NOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations, when used with a minimum set of Flight deck-based Interval Management (FIM) equipment and a prototype crew interface, were acceptable to and feasible for use by flight crews in a voice communications environment. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft automatic dependent surveillance broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated in LaRC's Air Traffic Operations Laboratory. Data were collected from 10 crews of current, qualified 757/767 pilots asked to fly a high-fidelity, fixed based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into DFW, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final, and Tower controllers. Pilot participant feedback indicated that the procedures used by flight crews to receive and execute interval management (IM) clearances in a voice communications environment were logical, easy to follow, did not contain any missing or extraneous steps, and required the use of an acceptable level of workload. The majority of the pilot participants found the IM concept, in addition to the proposed FIM crew procedures, to be acceptable and indicated that the ATD-1 procedures can be successfully executed in a near-term NextGen environment.

  11. NASA System Engineering Design Process

    NASA Technical Reports Server (NTRS)

    Roman, Jose

    2011-01-01

    This slide presentation reviews NASA's use of systems engineering for the complete life cycle of a project. Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. Each phase of a NASA project is terminated with a Key decision point (KDP), which is supported by major reviews.

  12. Benefit Estimates of Terminal Area Productivity Program Technologies

    NASA Technical Reports Server (NTRS)

    Hemm, Robert; Shapiro, Gerald; Lee, David; Gribko, Joana; Glaser, Bonnie

    1999-01-01

    This report documents benefit analyses for the NASA Terminal Area Technology (TAP) technology programs. Benefits are based on reductions in arrival delays at ten major airports over the 10 years from 2006 through 2015. Detailed analytic airport capacity and delay models were constructed to produce the estimates. The goal of TAP is enable good weather operations tempos in all weather conditions. The TAP program includes technologies to measure and predict runway occupancy times, reduce runway occupancy times in bad weather, accurately predict wake vortex hazards, and couple controller automation with aircraft flight management systems. The report presents and discusses the estimate results and describes the models. Three appendixes document the model algorithms and discuss the input parameters selected for the TAP technologies. The fourth appendix is the user's guide for the models. The results indicate that the combined benefits for all TAP technologies at all 10 airports range from $550 to $650 million per year (in constant 1997 dollars). Additional benefits will accrue from reductions in departure delays. Departure delay benefits are calculated by the current models.

  13. Tiltrotor Acoustic Flight Test: Terminal Area Operations

    NASA Technical Reports Server (NTRS)

    SantaMaria, O. L.; Wellman, J. B.; Conner, D. A.; Rutledge, C. K.

    1991-01-01

    This paper provides a comprehensive description of an acoustic flight test of the XV- 15 Tiltrotor Aircraft with Advanced Technology Blades (ATB) conducted in August and September 1991 at Crows Landing, California. The purpose of this cooperative research effort of the NASA Langley and Ames Research Centers was to obtain a preliminary, high quality database of far-field acoustics for terminal area operations of the XV-15 at a takeoff gross weight of approximately 14,000 lbs for various glide slopes, airspeeds, rotor tip speeds, and nacelle tilt angles. The test also was used to assess the suitability of the Crows Landing complex for full scale far-field acoustic testing. This was the first acoustic flight test of the XV-15 aircraft equipped with ATB involving approach and level flyover operations. The test involved coordination of numerous personnel, facilities and equipment. Considerable effort was made to minimize potential extraneous noise sources unique to the region during the test. Acoustic data from the level flyovers were analyzed, then compared with data from a previous test of the XV-15 equipped with Standard Metal Blades

  14. Technology transfer program: Perspective

    NASA Technical Reports Server (NTRS)

    Toyshov, A. J.

    1981-01-01

    Most of NASA's technology transfer activities are in the area of land use (development, suitability, and planning); forestry (including wildlife and range and vegetation inventories) agriculture related activities; and water resources. The technology dissemination function is exercised through three regional applications centers which are involved in 91 applications projects within 22 states. In addition there are approximately eight application system verification transfer (ASVT) projects, 21 university applications branches, institutionalized liason activities with public interest groups, and user requirements activities. As the result of budget cuts, the ASVT and user requirements and awareness programs are to be phased out at the end of FY81. The university applications programs are to be phased down and terminated by 1985. NASA will continue to work with the user more in an R & D and an applications development capacity, and not in a national scale or administrative way.

  15. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  16. A human operator simulator model of the NASA Terminal Configured Vehicle (TCV)

    NASA Technical Reports Server (NTRS)

    Glenn, F. A., III; Doane, S. M.

    1981-01-01

    A generic operator model called HOS was used to simulate the behavior and performance of a pilot flying a transport airplane during instrument approach and landing operations in order to demonstrate the applicability of the model to problems associated with interfacing a crew with a flight system. The model which was installed and operated on NASA Langley's central computing system is described. Preliminary results of its application to an investigation of an innovative display system under development in Langley's terminal configured vehicle program are considered.

  17. Communication Technology Satellite Portable Terminal

    NASA Image and Video Library

    1977-03-21

    This vehicle served as a mobile terminal for the Communications Technology Satellite. The Communications Technology Satellite was an experimental communications satellite launched in January 1976 by the National Aeronautics and Space Administration (NASA) and the Canadian Department of Communications. The satellite operated in a new frequency band reserved for broadcast satellites with transmitting power levels that were 10 to 20 times higher than those of contemporary satellites. Throughout 1977 and 1978 NASA allowed qualified groups to utilize the satellite from one of the three ground-based transmission centers. NASA’s Lewis Research Center in Cleveland, Ohio was NASA’s lead center on the project. Lewis was responsible for the control and coordination of all US experiments on the satellite. The center housed the satellite’s main control center which included eight parabolic reflector antennae ranging from 2 to 15 feet in diameter. Many of the satellite’s components had been tested in simulated space conditions at Lewis. The Lewis-designed vehicle seen here served as a field unit for transmitting and receiving wideband signals and narrowband voice. The vehicle permitted live television interviews, recording equipment, and cameras. An 8-foot diameter parabolic reflector was mounted on the roof. The interior of the vehicle had workstations, monitors, transmitting equipment, and a lounge area.

  18. The NASA-Langley Wake Vortex Modelling Effort in Support of an Operational Aircraft Spacing System

    NASA Technical Reports Server (NTRS)

    Proctor, Fred H.

    1998-01-01

    Two numerical modelling efforts, one using a large eddy simulation model and the other a numerical weather prediction model, are underway in support of NASA's Terminal Area Productivity program. The large-eddy simulation model (LES) has a meteorological framework and permits the interaction of wake vortices with environments characterized by crosswind shear, stratification, humidity, and atmospheric turbulence. Results from the numerical simulations are being used to assist in the development of algorithms for an operational wake-vortex aircraft spacing system. A mesoscale weather forecast model is being adapted for providing operational forecast of winds, temperature, and turbulence parameters to be used in the terminal area. This paper describes the goals and modelling approach, as well as achievements obtained to date. Simulation results will be presented from the LES model for both two and three dimensions. The 2-D model is found to be generally valid for studying wake vortex transport, while the 3-D approach is necessary for realistic treatment of decay via interaction of wake vortices and atmospheric boundary layer turbulence. Meteorology is shown to have an important affect on vortex transport and decay. Presented are results showing that wake vortex transport is unaffected by uniform fog or rain, but wake vortex transport can be strongly affected by nonlinear vertical change in the ambient crosswind. Both simulation and observations show that atmospheric vortices decay from the outside with minimal expansion of the core. Vortex decay and the onset three-dimensional instabilities are found to be enhanced by the presence of ambient turbulence.

  19. Quantifying Pilot Visual Attention in Low Visibility Terminal Operations

    NASA Technical Reports Server (NTRS)

    Ellis, Kyle K.; Arthur, J. J.; Latorella, Kara A.; Kramer, Lynda J.; Shelton, Kevin J.; Norman, Robert M.; Prinzel, Lawrence J.

    2012-01-01

    Quantifying pilot visual behavior allows researchers to determine not only where a pilot is looking and when, but holds implications for specific behavioral tracking when these data are coupled with flight technical performance. Remote eye tracking systems have been integrated into simulators at NASA Langley with effectively no impact on the pilot environment. This paper discusses the installation and use of a remote eye tracking system. The data collection techniques from a complex human-in-the-loop (HITL) research experiment are discussed; especially, the data reduction algorithms and logic to transform raw eye tracking data into quantified visual behavior metrics, and analysis methods to interpret visual behavior. The findings suggest superior performance for Head-Up Display (HUD) and improved attentional behavior for Head-Down Display (HDD) implementations of Synthetic Vision System (SVS) technologies for low visibility terminal area operations. Keywords: eye tracking, flight deck, NextGen, human machine interface, aviation

  20. An Overview of a Trajectory-Based Solution for En Route and Terminal Area Self-Spacing: Fifth Edition

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.

    2015-01-01

    This paper presents an overview of the fifth revision to an algorithm specifically designed to support NASA's Airborne Precision Spacing concept. This algorithm is referred to as the Airborne Spacing for Terminal Arrival Routes version 12 (ASTAR12). This airborne self-spacing concept is trajectory-based, allowing for spacing operations prior to the aircraft being on a common path. Because this algorithm is trajectory-based, it also has the inherent ability to support required-time-of- arrival (RTA) operations. This algorithm was also designed specifically to support a standalone, non-integrated implementation in the spacing aircraft. This current revision to the algorithm includes a ground speed feedback term to compensate for slower than expected traffic aircraft speeds based on the accepted air traffic control tendency to slow aircraft below the nominal arrival speeds when they are farther from the airport.

  1. KSC Small Business Expo

    NASA Image and Video Library

    2017-10-24

    A Small Business panel discussion was held during Kennedy Space Center's 27th Business Opportunities Expo held at Cruise Terminal 5 at Port Canaveral in Florida. Seated at the table, from left, are Ileana Serrano, data dissemination specialist, U.S. Census Bureau; Margot Dorfman, chief executive officer, U.S. Women's Chamber of Commerce; Valerie Muck, Small Business director; U.S. Air Force; Andrew Harold, co-founder and board chairman, Florida 8(a) Alliance; and Eduardo Ramos, senior area manager, U.S. Small Business Administration. The event featured more than 180 businesses, large and small, and government exhibitors from throughout the Space Coast and the nation. The Business Opportunities Expo is sponsored by the NASA KSC Prime Contractor Board, KSC Industry Assistance Office, 45th Space Wing and Canaveral Port Authority. Exhibitors included vendors from a variety of product and service areas, such as computer technology, engineering services, communication equipment and services, and construction and safety products, to name a few. Representatives from the 45th Space Wing, KSC prime contractors, NASA and many more agencies and organizations were on hand to provide information and answer questions.

  2. Titania High-Resolution Color Composite

    NASA Image and Video Library

    1996-01-29

    This high-resolution color composite of Titania was made from NASA Voyager 2 images taken Jan. 24, 1986, as the spacecraft neared its closest approach to Uranus. A large, trenchlike feature is seen near the terminator. http://photojournal.jpl.nasa.gov/catalog/PIA00036

  3. Advanced communications technology satellite high burst rate link evaluation terminal experiment control and monitor software user's guide, version 1.0

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.

    1992-01-01

    The Experiment Control and Monitor (EC&M) software was developed at NASA Lewis Research Center to support the Advanced Communications Technology Satellite (ACTS) High Burst Rate Link Evaluation Terminal (HBR-LET). The HBR-LET is an experimenter's terminal to communicate with the ACTS for various investigations by government agencies, universities, and industry. The EC&M software is one segment of the Control and Performance Monitoring (C&PM) software system of the HBR-LET. The EC&M software allows users to initialize, control, and monitor the instrumentation within the HBR-LET using a predefined sequence of commands. Besides instrument control, the C&PM software system is also responsible for computer communication between the HBR-LET and the ACTS NASA Ground Station and for uplink power control of the HBR-LET to demonstrate power augmentation during rain fade events. The EC&M Software User's Guide, Version 1.0 (NASA-CR-189160) outlines the commands required to install and operate the EC&M software. Input and output file descriptions, operator commands, and error recovery procedures are discussed in the document.

  4. Terminator View of Mercury

    NASA Image and Video Library

    2014-07-02

    Date acquired: May 05, 2014 Today's color image features both Mercury's terminator and limb. The terminator is the striking separation of night and day on Mercury. It is seen in this image with the change from dark, on the left of the image, to light. Mercury's limb is also captured, as we can see the edge between sunlit Mercury and space. The MESSENGER spacecraft is the first ever to orbit the planet Mercury, and the spacecraft's seven scientific instruments and radio science investigation are unraveling the history and evolution of the Solar System's innermost planet. During the first two years of orbital operations, MESSENGER acquired over 150,000 images and extensive other data sets. MESSENGER is capable of continuing orbital operations until early 2015. Credit: NASA/Johns Hopkins University Applied Physics Laboratory/Carnegie Institution of Washington NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  5. Parachute-Deployment Flight Termination System on X-48C

    NASA Image and Video Library

    2013-02-28

    The X-48C Hybrid Wing Body aircraft flew over Rogers Dry Lake on Feb. 28, 2013, from NASA's Dryden Flight Research Center, Edwards, CA. The long boom protruding from between the tails was part of the aircraft's parachute-deployment flight termination system.

  6. Satellite Communications for Aeronautics Applications: Technology Development and Demonstration

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert J.; Hoder, Douglas J.; Zakrajsek, Robert J.

    2001-01-01

    The National Aeronautics and Space Administration (NASA) is performing research and development to improve the safety and increase the capacity of the National Airspace System (NAS). Improved communications, especially to and from the aircraft flight deck, has been identified as an essential enabling technology for future improvements to the air traffic management system and aviation safety. NASA's Glenn Research Center is engaged in research and development of satellite communications technologies for aeronautical applications. A mobile aero terminal has been developed for use with Ku band commercial communications satellites. This experimental terminal will be used in mobile ground and air-based tests and demonstrations during 2000-2004. This paper will describe the basic operational parameters of the Ku Band aero terminal, the communications architecture it is intended to demonstrate, and the key technology issues being addressed in the tests and demonstrations. The design of the Ku Band aero terminal and associated ground testbed, planned tests and demonstrations, and results to date will be presented.

  7. Utilization of NASA Lewis mobile terminals for the Hermes satellite

    NASA Technical Reports Server (NTRS)

    Edelman, E. A.; Fiala, J. L.; Rizzolla, L.

    1977-01-01

    The paper describes the portable earth terminal (PET) and the transportable earth terminal (TET) which enable two-way television and voice communication. Both terminals were developed by NASA and utilize the high power of the Hermes satellite. PET is a bus-type vehicle which has receiving equipment for full duplex color television and which can transmit programs originating in either the on-board PET studio or in nearby buildings. PET has a collapsible 2.4-m diameter parabolic antenna interfacing with a 500-watt 14-GHz wideband TV transmitter and a 12-GHz wideband TV receiver system. TET uses two parabolic reflector antennas, 3 m and 1.2 m in diameter, mounted on a flat trailer towed by a truck. TET can receive and relay color TV signals, and its narrowband transmitter can serve as a return audio link permitting a question-and-answer format. Also described are uplink and downlink performance characteristics, operation procedures, and field demonstrations which enabled personnel at several hospitals to participate in a distant medical conference.

  8. ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with ACTS. The ACTS experiments program proposed to validate Ka-band satellite and ground-station technology, demonstrate future telecommunication services, demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals and the lessons learned throughout their 6-year operation, including the inclined orbit phase-of-operations. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector-based offset-fed antenna systems with antennas ranging in size from 0.35 to 3.4 in. in diameter. Gateway earth stations included two systems referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET).

  9. Design of Quasi-Terminator Orbits near Primitive Bodies

    NASA Technical Reports Server (NTRS)

    Lantoine, Gregory; Broschart, Stephen B.; Grebow, Daniel J.

    2013-01-01

    Quasi-terminator orbits are a class of quasi-periodic orbits around a primitive body that exist in the vicinity of the well-known terminator orbits. The inherent stability of quasi-terminator trajectories and their wide variety of viewing geometries make them a very compelling option for primitive body mapping missions. In this paper, we discuss orbit design methodologies for selection of an appropriate quasi-terminator orbit that would meet the needs of a specific mission. Convergence of these orbits in an eccentric, higher-fidelity model is also discussed with an example case at Bennu, the target of the upcoming NASA's OSIRIS-REx mission.

  10. An Overview of a Trajectory-Based Solution for En Route and Terminal Area Self-Spacing: Fourth Revision

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.

    2013-01-01

    This paper presents an overview of the fourth major revision to an algorithm specifically designed to support NASA's Airborne Precision Spacing concept. This airborne self-spacing concept is trajectory-based, allowing for spacing operations prior to the aircraft being on a common path. Because this algorithm is trajectory-based, it also has the inherent ability to support required-time-of-arrival (RTA) operations. This algorithm was also designed specifically to support a standalone, non-integrated implementation in the spacing aircraft. Revisions to this algorithm were based on a change to the expected operational environment.

  11. Alternate aircraft fuels prospects and operational implications

    NASA Technical Reports Server (NTRS)

    Witcofski, R. D.

    1977-01-01

    The paper discusses NASA studies of the potentials of coal-derived aviation fuels, specifically synthetic aviation kerosene, liquid methane, and liquid hydrogen. Topics include areas of fuel production, air terminal requirements for aircraft fueling (for liquid hydrogen only), and the performance characteristics of aircraft designed to utilize alternate fuels. Energy requirements associated with the production of each of the three selected fuels are determined, and fuel prices are estimated. Subsonic commercial air transports using liquid hydrogen fuel have been analyzed, and their performance and the performance of aircraft which use commercial aviation kerosene are compared. Environmental and safety issues are considered.

  12. Implementation of the Enhanced Flight Termination System at National Aeronautics and Space Administration Dryden Flight Research Center

    NASA Technical Reports Server (NTRS)

    Tow, David

    2010-01-01

    This paper discusses the methodology, requirements, tests, and results of the implementation of the current operating capability for the Enhanced Flight Termination System (EFTS) at the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC). The implementation involves the development of the EFTS at NASA DFRC starting from the requirements to system safety review to full end to end system testing, and concluding with the acceptance of the system as an operational system. The paper discusses the first operational usage and subsequent flight utilizing EFTS successfully.

  13. Southern Hemisphere Close-Up

    NASA Image and Video Library

    2016-09-02

    This image provides a close-up view of Jupiter's southern hemisphere, as seen by NASA's Juno spacecraft on August 27, 2016. The JunoCam instrument captured this image with its red spectral filter when the spacecraft was about 23,600 miles (38,000 kilometers) above the cloud tops. The image covers an area from close to the south pole to 20 degrees south of the equator, centered on a longitude at about 140 degrees west. The transition between the banded structures near the equator and the more chaotic polar region (south of about 65 degrees south latitude) can be clearly seen. The smaller version at right of this image shows the same view with a latitude/longitude grid overlaid. This image has been processed to remove shading effects near the terminator -- the dividing line between day and night -- caused by Juno's orbit. http://photojournal.jpl.nasa.gov/catalog/PIA21035

  14. Simulating Wake Vortex Detection with the Sensivu Doppler Wind Lidar Simulator

    NASA Technical Reports Server (NTRS)

    Ramsey, Dan; Nguyen, Chi

    2014-01-01

    In support of NASA's Atmospheric Environment Safety Technologies NRA research topic on Wake Vortex Hazard Investigation, Aerospace Innovations (AI) investigated a set of techniques for detecting wake vortex hazards from arbitrary viewing angles, including axial perspectives. This technical report describes an approach to this problem and presents results from its implementation in a virtual lidar simulator developed at AI. Threedimensional data volumes from NASA's Terminal Area Simulation System (TASS) containing strong turbulent vortices were used as the atmospheric domain for these studies, in addition to an analytical vortex model in 3-D space. By incorporating a third-party radiative transfer code (BACKSCAT 4), user-defined aerosol layers can be incorporated into atmospheric models, simulating attenuation and backscatter in different environmental conditions and altitudes. A hazard detection algorithm is described that uses a twocomponent spectral model to identify vortex signatures observable from arbitrary angles.

  15. KSC-08pd1205

    NASA Image and Video Library

    2008-05-08

    CAPE CANAVERAL, Fla. -- At the slidewire landing area of Launch Pad 39A at NASA's Kennedy Space Center, the STS-124 crew poses for a final group photo following the media question-and-answer event. From left are Commander Mark Kelly, Pilot Ken Ham, and Mission Specialists Karen Nyberg, Ron Garan, Mike Fossum, Akihiko Hoshide and Greg Chamitoff. Hoshide represents the Japan Aerospace Exploration Agency. In the background is the fixed service structure (center) and the 300-gallon water tower (left). The crew is at Kennedy for a dress launch rehearsal called the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  16. XV-15 Low-Noise Terminal Area Operations Testing

    NASA Technical Reports Server (NTRS)

    Edwards, B. D.

    1998-01-01

    Test procedures related to XV-15 noise tests conducted by NASA-Langley and Bell Helicopter Textron, Inc. are discussed. The tests. which took place during October and November 1995, near Waxahachie, Texas, documented the noise signature of the XV-15 tilt-rotor aircraft at a wide variety of flight conditions. The stated objectives were to: -provide a comprehensive acoustic database for NASA and U.S. Industry -validate noise prediction methodologies, and -develop and demonstrate low-noise flight profiles. The test consisted of two distinct phases. Phase 1 provided an acoustic database for validating analytical noise prediction techniques; Phase 2 directly measured noise contour information at a broad range of operating profiles, with emphasis on minimizing 'approach' noise. This report is limited to a documentation of the test procedures, flight conditions, microphone locations, meteorological conditions, and test personnel used in the test. The acoustic results are not included.

  17. Better-Than-Visual Technologies for Next Generation Air Transportation System Terminal Maneuvering Area Operations

    NASA Technical Reports Server (NTRS)

    Prinzel, Lawrence J., III; Bailey, Randall E.; Shelton, Kevin J.; Jones, Denise R.; Kramer, Lynda J.; Arthur, Jarvis J., III; Williams, Steve P.; Barmore, Bryan E.; Ellis, Kyle E.; Rehfeld, Sherri A.

    2011-01-01

    A consortium of industry, academia and government agencies are devising new concepts for future U.S. aviation operations under the Next Generation Air Transportation System (NextGen). Many key capabilities are being identified to enable NextGen, including the concept of Equivalent Visual Operations (EVO) replicating the capacity and safety of today's visual flight rules (VFR) in all-weather conditions. NASA is striving to develop the technologies and knowledge to enable EVO and to extend EVO towards a Better-Than-Visual (BTV) operational concept. The BTV operational concept uses an electronic means to provide sufficient visual references of the external world and other required flight references on flight deck displays that enable VFR-like operational tempos and maintain and improve the safety of VFR while using VFR-like procedures in all-weather conditions. NASA Langley Research Center (LaRC) research on technologies to enable the concept of BTV is described.

  18. Exploration of Terminal Procedures Enabled by NASA Wake VAS Technologies

    NASA Technical Reports Server (NTRS)

    Lunsford, Clark R.; Smith, Arthur P., III; Cooper, Wayne W., Jr.; Mundra, Anand D.; Gross, Amy E.; Audenaerd, Laurence F.; Killian, Bruce E.

    2004-01-01

    The National Aeronautics and Space Administration (NASA) tasked The MITRE Corporation's Center for Advanced Aviation System Development (CAASD) to investigate potential air traffic control (ATC) procedures that could benefit from technology used or developed in NASA's Wake Vortex Advisory System (WakeVAS). The task also required developing an estimate of the potential benefits of the candidate procedures. The main thrust of the investigation was to evaluate opportunities for improved capacity and efficiency in airport arrival and departure operations. Other procedures that would provide safety enhancements were also considered. The purpose of this investigation was to provide input to the WakeVAS program office regarding the most promising areas of development for the program. A two-fold perspective was desired: First, identification of benefits from possible procedures enabled by both incremental components and the mature state of WakeVAS technology; second identification of procedures that could be expected to evolve from the current Federal Aviation Administration (FAA) procedures. The evolution of procedures should provide meaningful increments of benefit and a low risk implementation of the WakeVAS technologies.

  19. Application of Global Positioning Measurements to Continental Collision in the Pamir-Tien Shan Region, Central Asia and GPS Survey of the Western Tien Shan

    NASA Technical Reports Server (NTRS)

    Hamburger, Michael W.; Reilinger, Robert E.; Hager, Bradford H.; Molnar, Peter

    1997-01-01

    In this report, we summarize what we have accomplished with five years of funding from NASA under its DOSE program, and with a comparable level of funding from NSF. We describe the development of a GPS network in the Tien Shan of Kyrgyzstan and Kazakhstan of the former Soviet Union, the analysis of data, and the main results. This discussion presents the state of the current network, which has grown significantly since the termination of our DOSE grants, with continued support both from NSF through its continental dynamics program and from NASA's SENH program. Although grants from NASA's DOSE program did not support this growth not directly, it did so indirectly by building the infrastructure that has enabled further expansion in an area where otherwise there would be only a small GPS presence. We note how the network has grown over time, but the emphasis of this discussion is on the quantity and quality of measurements that we have made.

  20. KSC-2010-1335

    NASA Image and Video Library

    2010-01-20

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission take time out from their emergency exit training at Launch Pad 39A to pose for a group portrait in the White Room. Standing, from left, are Pilot Terry Virts and Mission Specialists Kathryn Hire and Robert Behnken. Kneeling, from left, are Mission Specialist Stephen Robinson, Commander George Zamka and Mission Specialist Nicholas Patrick. The crew members of space shuttle Endeavour's upcoming mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. Endeavour's launch is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Kim Shiflett

  1. KSC-2010-1307

    NASA Image and Video Library

    2010-01-19

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission pause from their M113 training for a group portrait. From left are Commander George Zamka; Pilot Terry Virts; and Mission Specialists Robert Behnken, Kathryn Hire, Stephen Robinson and Nicholas Patrick. An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed. The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. Endeavour's launch is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Kim Shiflett

  2. Interoperability through standardization: Electronic mail, and X Window systems

    NASA Technical Reports Server (NTRS)

    Amin, Ashok T.

    1993-01-01

    Since the introduction of computing machines, there has been continual advances in computer and communication technologies and approaching limits. The user interface has evolved from a row of switches, character based interface using teletype terminals and then video terminals, to present day graphical user interface. It is expected that next significant advances will come in the availability of services, such as electronic mail and directory services, as the standards for applications are developed and in the 'easy to use' interfaces, such as Graphical User Interface for example Window and X Window, which are being standardized. Various proprietary electronic mail (email) systems are in use within organizations at each center of NASA. Each system provides email services to users within an organization, however the support for email services across organizations and across centers exists at centers to a varying degree and is often easy to use. A recent NASA email initiative is intended 'to provide a simple way to send email across organizational boundaries without disruption of installed base.' The initiative calls for integration of existing organizational email systems through gateways connected by a message switch, supporting X.400 and SMTP protocols, to create a NASA wide email system and for implementation of NASA wide email directory services based on OSI standard X.500. A brief overview of MSFC efforts as a part of this initiative are described. Window based graphical user interfaces make computers easy to use. X window protocol has been developed at Massachusetts Institute of Technology in 1984/1985 to provide uniform window based interface in a distributed computing environment with heterogenous computers. It has since become a standard supported by a number of major manufacturers. Z Windows systems, terminals and workstations, and X Window applications are becoming available. However impact of its use in the Local Area Network environment on the network traffic are not well understood. It is expected that the use of X Windows systems will increase at MSFC especially for Unix based systems. An overview of X Window protocol is presented and its impact on the network traffic is examined. It is proposed that an analytical model of X Window systems in the network environment be developed and validated through the use of measurements to generate application and user profiles.

  3. NASIS data base management system: IBM 360 TSS implementation. Volume 8: Data base administrator user's guide

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The Data Base Administrator User's Guide for the NASA Aerospace Safety Information System is presented. The subjects discussed are: (1) multi-terminal tasking, (2) data base executive, (3) utilities, (4) maintenance, (5) terminal support, and (6) retrieval subsystem.

  4. The link evaluation terminal for the advanced communications technology satellite experiments program

    NASA Technical Reports Server (NTRS)

    May, Brian D.

    1992-01-01

    The experimental NASA satellite, Advanced Communications Technology Satellite (ACTS), introduces new technology for high throughput 30 to 20 GHz satellite services. Contained in a single communication payload is both a regenerative TDMA system and multiple 800 MHz 'bent pipe' channels routed to spot beams by a switch matrix. While only one mode of operation is typical during any experiment, both modes can operate simultaneously with reduced capability due to sharing of the transponder. NASA-Lewis instituted a ground terminal development program in anticipation of the satellite launch to verify the performance of the switch matrix mode of operations. Specific functions are built into the ground terminal to evaluate rain fade compensation with uplink power control and to monitor satellite transponder performance with bit error rate measurements. These functions were the genesis of the ground terminal's name, Link Evaluation Terminal, often referred to as LET. Connectors are included in LET that allow independent experimenters to run unique modulation or network experiments through ACTS using only the RF transmit and receive portions of LET. Test data indicate that LET will be able to verify important parts of ACTS technology and provide independent experimenters with a useful ground terminal. Lab measurements of major subsystems integrated into LET are presented. Bit error rate is measured with LET in an internal loopback mode.

  5. Ka-band Technologies for Small Spacecraft Communications via Relays and Direct Data Downlink

    NASA Technical Reports Server (NTRS)

    Budinger, James M.; Niederhaus, Charles; Reinhart, Richard; Downey, Joe; Roberts, Anthony

    2016-01-01

    As the scientific capabilities and number of small spacecraft missions in the near Earth region increase, standard yet configurable user spacecraft terminals operating in Ka-band are needed to lower mission cost and risk and enable significantly higher data return than current UHF or S-band terminals. These compact Ka-band terminals are intended to operate with both the current and next generation of Ka-band relay satellites and via direct data communications with near Earth tracking terminals. This presentation provides an overview of emerging NASA-sponsored and commercially provided technologies in software defined radios (SDRs), transceivers, and electronically steered antennas that will enable data rates from hundreds of kbps to over 1 Gbps and operate in multiple frequency bands (such as S- and X-bands) and expand the use of NASA's common Ka-bands frequencies: 22.55-23.15 GHz for forward data or uplink; and 25.5-27.0 GHz for return data or downlink. Reductions in mass, power and volume come from integration of multiple radio functions, operations in Ka-band, high efficiency amplifiers and receivers, and compact, flat and vibration free electronically steered narrow beam antennas for up to + 60 degrees field of regard. The software defined near Earth space transceiver (SD-NEST) described in the presentation is intended to be compliant with NASA's space telecommunications radio system (STRS) standard for communications waveforms and hardware interoperability.

  6. 75 FR 82576 - Federal Acquisition Regulation; Terminating Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... Acquisition Council (Councils) agree. The language at FAR 49.501, pertaining to the applicability of FAR part...-AL56 Federal Acquisition Regulation; Terminating Contracts AGENCY: Department of Defense (DoD), General.... SUMMARY: DoD, GSA, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to...

  7. 14 CFR § 1214.108 - Termination.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214... standard services to NASA. (1) The termination fee for dedicated flights will be computed as a percentage of the Shuttle standard flight price and will be based on the table below. Months before scheduled...

  8. 14 CFR § 1260.76 - Termination and enforcement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... situations that cannot be handled any other way (see § 1260.160). (b) The Director, Contract Management..., suspensions, determinations of ineligibility, and voluntary exclusions of persons in accordance with 2 CFR 180...-responsive organizations. Special condition at § 1260.56 allows NASA to suspend or terminate advance payments...

  9. 14 CFR 1260.76 - Termination and enforcement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... cannot be handled any other way (see § 1260.160). (b) The Director, Contract Management Division, shall..., determinations of ineligibility, and voluntary exclusions of persons in accordance with 2 CFR 180.505. (c... organizations. Special condition at § 1260.56 allows NASA to suspend or terminate advance payments under an...

  10. 14 CFR 1260.76 - Termination and enforcement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... cannot be handled any other way (see § 1260.160). (b) The Director, Contract Management Division, shall..., determinations of ineligibility, and voluntary exclusions of persons in accordance with 2 CFR 180.505. (c... organizations. Special condition at § 1260.56 allows NASA to suspend or terminate advance payments under an...

  11. 14 CFR 1260.76 - Termination and enforcement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cannot be handled any other way (see § 1260.160). (b) The Director, Contract Management Division, shall..., determinations of ineligibility, and voluntary exclusions of persons in accordance with 2 CFR 180.505. (c... organizations. Special condition at § 1260.56 allows NASA to suspend or terminate advance payments under an...

  12. 14 CFR 1260.76 - Termination and enforcement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... cannot be handled any other way (see § 1260.160). (b) The Director, Contract Management Division, shall..., determinations of ineligibility, and voluntary exclusions of persons in accordance with 2 CFR 180.505. (c... organizations. Special condition at § 1260.56 allows NASA to suspend or terminate advance payments under an...

  13. The Evolution of Extravehicular Activity Operations to Lunar Exploration Based on Operational Lessons Learned During 2009 NASA Desert RATS Field Testing

    NASA Technical Reports Server (NTRS)

    Bell, Ernest R., Jr.; Welsh, Daren; Coan, Dave; Johnson, Kieth; Ney, Zane; McDaniel, Randall; Looper, Chris; Guirgis, Peggy

    2010-01-01

    This paper will present options to evolutionary changes in several philosophical areas of extravehicular activity (EVA) operations. These areas will include single person verses team EVAs; various loss of communications scenarios (with Mission Control, between suited crew, suited crew to rover crew, and rover crew A to rover crew B); EVA termination and abort time requirements; incapacitated crew ingress time requirements; autonomous crew operations during loss of signal periods including crew decisions on EVA execution (including decision for single verses team EVA). Additionally, suggestions as to the evolution of the make-up of the EVA flight control team from the current standard will be presented. With respect to the flight control team, the major areas of EVA flight control, EVA Systems and EVA Tasks, will be reviewed, and suggested evolutions of each will be presented. Currently both areas receive real-time information, and provide immediate feedback during EVAs as well as spacesuit (extravehicular mobility unit - EMU) maintenance and servicing periods. With respect to the tasks being performed, either EMU servicing and maintenance, or the specific EVA tasks, daily revising of plans will need to be able to be smoothly implemented to account for unforeseen situations and findings. Many of the presented ideas are a result of lessons learned by the NASA Johnson Space Center Mission Operations Directorate operations team support during the 2009 NASA Desert Research and Technology Studies (Desert RATS). It is important that the philosophy of both EVA crew operations and flight control be examined now, so that, where required, adjustments can be made to a next generation EMU and EVA equipment that will complement the anticipated needs of both the EVA flight control team and the crews.

  14. Advanced Communications Technology Satellite high burst rate link evaluation terminal experiment control and monitor software maintenance manual, version 1.0

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.

    1992-01-01

    The Experiment Control and Monitor (EC&M) software was developed at NASA Lewis Research Center to support the Advanced Communications Technology Satellite (ACTS) High Burst Rate Link Evaluation Terminal (HBR-LET). The HBR-LET is an experimenter's terminal to communicate with the ACTS for various investigations by government agencies, universities, and industry. The EC&M software is one segment of the Control and Performance Monitoring (C&PM) software system of the HBR-LET. The EC&M software allows users to initialize, control, and monitor the instrumentation within the HBR-LET using a predefined sequence of commands. Besides instrument control, the C&PM software system is also responsible for computer communication between the HBR-LET and the ACTS NASA Ground Station and for uplink power control of the HBR-LET to demonstrate power augmentation during rain fade events. The EC&M Software User's Guide, Version 1.0 (NASA-CR-189160) outlines the commands required to install and operate the EC&M software. Input and output file descriptions, operator commands, and error recovery procedures are discussed in the document. The EC&M Software Maintenance Manual, Version 1.0 (NASA-CR-189161) is a programmer's guide that describes current implementation of the EC&M software from a technical perspective. An overview of the EC&M software, computer algorithms, format representation, and computer hardware configuration are included in the manual.

  15. The Taxiway Navigation and Situation Awareness (T-NASA) System

    NASA Technical Reports Server (NTRS)

    Foyle, David C.; Sridhar, Banavar (Technical Monitor)

    1997-01-01

    The goal of NASA's Terminal Area Productivity (TAP) Low-Visibility Landing and Surface Operations (LVLASO) subelement is to improve the efficiency of airport surface operations for commercial aircraft operating in weather conditions to Category IIIB while maintaining a high degree of safety. Currently, surface operations are one of the least technologically sophisticated components of the air transport system, being conducted in the 1990's with the same basic technology as in the 1930's. Pilots are given little or no explicit information about their current position, and routing information is limited to ATC communications and airport charts. In TAP/LVLASO, advanced technologies such as satellite navigation systems, digital data communications, advanced information presentation technology, and ground surveillance systems will be integrated into flight deck displays to enable expeditious and safe traffic movement on the airport surface. The cockpit display suite is called the T-NASA (Taxiway Navigation and Situation Awareness) System. This system has three integrated components: 1) Moving Map track-up airport surface display with own-ship, traffic and graphical route guidance 2) Scene-Linked Symbology - route/taxi information virtually projected via a Head-up Display (HUD) onto the forward scene; and, 3) 3-D Audio Ground Collision Avoidance and Navigation system - spatially-localized auditory traffic and navigation alerts. In the current paper, the design philosophy of the T-NASA system will be presented, and the T-NASA system display components described.

  16. K- and Ka-band mobile-vehicular satellite-tracking reflector antenna system for the NASA ACTS mobile terminal

    NASA Technical Reports Server (NTRS)

    Densmore, Art; Jamnejad, Vahraz; Wu, T. K.; Woo, Ken

    1993-01-01

    This paper describes the development of the K- and Ka-band mobile-vehicular satellite-tracking reflector antenna system for NASA's ACTS Mobile Terminal (AMT) project. ACTS is NASA's Advanced Communications Technology Satellites. The AMT project will make the first experimental use of ACTS soon after the satellite is operational, to demonstrate mobile communications via the satellite from a van on the road. The AMT antenna system consists of a mechanically steered small reflector antenna, using a shared aperture for both frequency bands and fitting under a radome of 23 cm diameter and 10 cm height, and a microprocessor controlled antenna controller that tracks the satellite as the vehicle moves about. The RF and mechanical characteristics of the antenna and the antenna tracking control system are discussed. Measurements of the antenna performance are presented.

  17. Styrene-terminated polysulfone oligomers as matrix material for graphite reinforced composites: An initial study

    NASA Technical Reports Server (NTRS)

    Garcia, Dana; Bowles, Kenneth J.; Vannucci, Raymond D.

    1987-01-01

    Styrene terminated polysulfone oligomers are part of an oligomeric class of compounds with end groups capable of thermal polymerization. These materials can be used as matrices for graphite reinforced composites. The initial evaluation of styrene terminated polysulfone oligomer based composites are summarized in terms of fabrication methods, and mechanical and environmental properties. In addition, a description and evaluation is provided of the NASA/Industry Fellowship Program for Technology Transfer.

  18. Efficiency Benefits Using the Terminal Area Precision Scheduling and Spacing System

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Swenson, Harry N.; Lin, Paul; Seo, Anthony Y.; Bagasol, Leonard N.

    2011-01-01

    NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to increase the use of fuel-efficient arrival procedures during periods of traffic congestion at a high-density airport. Sustained use of fuel-efficient procedures throughout the entire arrival phase of flight reduces overall fuel burn, greenhouse gas emissions and noise pollution. The TAPSS system is a 4D trajectory-based strategic planning and control tool that computes schedules and sequences for arrivals to facilitate optimal profile descents. This paper focuses on quantifying the efficiency benefits associated with using the TAPSS system, measured by reduction of level segments during aircraft descent and flight distance and time savings. The TAPSS system was tested in a series of human-in-the-loop simulations and compared to current procedures. Compared to the current use of the TMA system, simulation results indicate a reduction of total level segment distance by 50% and flight distance and time savings by 7% in the arrival portion of flight (200 nm from the airport). The TAPSS system resulted in aircraft maintaining continuous descent operations longer and with more precision, both achieved under heavy traffic demand levels.

  19. Topography and Volcanoes on Io (color)

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The images used to create this enhanced color composite of Io were acquired by NASA's Galileo spacecraft during its seventh orbit (G7) of Jupiter. Low sun angles near the terminator (day-night boundary near the left side of the image) offer lighting conditions which emphasize the topography or relief on the volcanic satellite. The topography appears very flat near the active volcanic centers such as Loki Patera (the large dark horse-shoe shaped feature near the terminator) while a variety of mountains and plateaus exist elsewhere. The big reddish-orange ring in the lower right is formed by material deposited from the eruption of Pele, Io's largest volcanic plume.

    North is to the top of this picture which merges images obtained with the clear, red, green, and violet filters of the solid state imaging (CCD) system on NASA's Galileo spacecraft. The resolution is 6.1 kilometers per picture element. The images were taken on April 4th, 1997 at a range of 600,000 kilometers.

    The Jet Propulsion Laboratory, Pasadena, CA manages the Galileo mission for NASA's Office of Space Science, Washington, DC. JPL is an operating division of California Institute of Technology (Caltech).

    Concurrent results from Galileo's exploration of Io appear in the October 15th, 1997 issue of Geophysical Research Letters. The papers are: Temperature and Area Constraints of the South Volund Volcano on Io from the NIMS and SSI Instruments during the Galileo G1 Orbit, by A.G. Davies, A.S. McEwen, R. Lopes-Gautier, L. Keszthelyi, R.W. Carlson and W.D. Smythe. High-temperature hot spots on Io as seen by the Galileo Solid-State Imaging (SSI) experiment, by A. McEwen, D. Simonelli, D. Senske, K. Klassen, L. Keszthelyi, T. Johnson, P. Geissler, M. Carr, and M. Belton. Io: Galileo evidence for major variations in regolith properties, by D. Simonelli, J. Veverka, and A. McEwen.

    This image and other images and data received from Galileo are posted on the World Wide Web, on the Galileo mission home page at URL http://galileo.jpl.nasa.gov. Background information and educational context for the images can be found at URL http://www.jpl.nasa.gov/galileo/sepo

  20. Design of a Ka-Band Propagation Terminal for Atmospheric Measurements in Polar Regions

    NASA Technical Reports Server (NTRS)

    Houts, Jacquelynne R.; Nessel, James A.; Zemba, Michael J.

    2016-01-01

    This paper describes the design and performance of a Ka-Band beacon receiver developed at NASA Glenn Research Center (GRC) that will be installed alongside an existing Ka-Band Radiometer [2] located at the east end of the Svalbard Near Earth Network (NEN) complex. The goal of this experiment is to characterize rain fade attenuation to improve the performance of existing statistical rain attenuation models. The ground terminal developed by NASA GRC utilizes an FFT-based frequency estimation [3] receiver capable of characterizing total path attenuation effects due to gaseous absorption, clouds, rain, and scintillation by directly measuring the propagated signal from the satellite Thor 7.

  1. Design of a Ka-band Propagation Terminal for Atmospheric Measurements in Polar Regions

    NASA Technical Reports Server (NTRS)

    Houts, Jacquelynne R.; Nessel, James A.; Zemba, Michael J.

    2016-01-01

    This paper describes the design and performance of a Ka-Band beacon receiver developed at NASA Glenn Research Center (GRC) that will be installed alongside an existing Ka-Band Radiometer located at the east end of the Svalbard Near Earth Network (NEN) complex. The goal of this experiment is to characterize rain fade attenuation to improve the performance of existing statistical rain attenuation models. The ground terminal developed by NASA GRC utilizes an FFT-based frequency estimation receiver capable of characterizing total path attenuation effects due to gaseous absorption, clouds, rain, and scintillation by directly measuring the propagated signal from the satellite Thor 7.

  2. Flight Crew Workload, Acceptability, and Performance When Using Data Comm in a High-Density Terminal Area Simulation

    NASA Technical Reports Server (NTRS)

    Norman, R. Michael; Baxley, Brian T.; Adams, Cathy A.; Ellis, Kyle K. E.; Latorella, Kara A.; Comstock, James R., Jr.

    2013-01-01

    This document describes a collaborative FAA/NASA experiment using 22 commercial airline pilots to determine the effect of using Data Comm to issue messages during busy, terminal area operations. Four conditions were defined that span current day to future flight deck equipage: Voice communication only, Data Comm only, Data Comm with Moving Map Display, and Data Comm with Moving Map displaying taxi route. Each condition was used in an arrival and a departure scenario at Boston Logan Airport. Of particular interest was the flight crew response to D-TAXI, the use of Data Comm by Air Traffic Control (ATC) to send taxi instructions. Quantitative data was collected on subject reaction time, flight technical error, operational errors, and eye tracking information. Questionnaires collected subjective feedback on workload, situation awareness, and acceptability to the flight crew for using Data Comm in a busy terminal area. Results showed that 95% of the Data Comm messages were responded to by the flight crew within one minute and 97% of the messages within two minutes. However, post experiment debrief comments revealed almost unanimous consensus that two minutes was a reasonable expectation for crew response. Flight crews reported that Expected D-TAXI messages were useful, and employment of these messages acceptable at all altitude bands evaluated during arrival scenarios. Results also indicate that the use of Data Comm for all evaluated message types in the terminal area was acceptable during surface operations, and during arrivals at any altitude above the Final Approach Fix, in terms of response time, workload, situation awareness, and flight technical performance. The flight crew reported the use of Data Comm as implemented in this experiment as unacceptable in two instances: in clearances to cross an active runway, and D-TAXI messages between the Final Approach Fix and 80 knots during landing roll. Critical cockpit tasks and the urgency of out-the window scan made the additional head down time to respond to Data Comm messages undesirable during these events. However, most crews also stated that Data Comm messages without an accompanying audio chime and no expectation of an immediate response could be acceptable even during these events.

  3. An Impact-Location Estimation Algorithm for Subsonic Uninhabited Aircraft

    NASA Technical Reports Server (NTRS)

    Bauer, Jeffrey E.; Teets, Edward

    1997-01-01

    An impact-location estimation algorithm is being used at the NASA Dryden Flight Research Center to support range safety for uninhabited aerial vehicle flight tests. The algorithm computes an impact location based on the descent rate, mass, and altitude of the vehicle and current wind information. The predicted impact location is continuously displayed on the range safety officer's moving map display so that the flightpath of the vehicle can be routed to avoid ground assets if the flight must be terminated. The algorithm easily adapts to different vehicle termination techniques and has been shown to be accurate to the extent required to support range safety for subsonic uninhabited aerial vehicles. This paper describes how the algorithm functions, how the algorithm is used at NASA Dryden, and how various termination techniques are handled by the algorithm. Other approaches to predicting the impact location and the reasons why they were not selected for real-time implementation are also discussed.

  4. A burst compression and expansion technique for variable-rate users in satellite-switched TDMA networks

    NASA Technical Reports Server (NTRS)

    Budinger, James M.

    1990-01-01

    A burst compression and expansion technique is described for asynchronously interconnecting variable-data-rate users with cost-efficient ground terminals in a satellite-switched, time-division-multiple-access (SS/TDMA) network. Compression and expansion buffers in each ground terminal convert between lower rate, asynchronous, continuous-user data streams and higher-rate TDMA bursts synchronized with the satellite-switched timing. The technique described uses a first-in, first-out (FIFO) memory approach which enables the use of inexpensive clock sources by both the users and the ground terminals and obviates the need for elaborate user clock synchronization processes. A continous range of data rates from kilobits per second to that approaching the modulator burst rate (hundreds of megabits per second) can be accommodated. The technique was developed for use in the NASA Lewis Research Center System Integration, Test, and Evaluation (SITE) facility. Some key features of the technique have also been implemented in the gound terminals developed at NASA Lewis for use in on-orbit evaluation of the Advanced Communications Technology Satellite (ACTS) high burst rate (HBR) system.

  5. US development and commercialization of a North American mobile satellite service

    NASA Technical Reports Server (NTRS)

    Arnold, Ray J.; Gray, Valerie; Freibaum, Jerry

    1990-01-01

    U.S. policies promoting applications and commercialization of space technology for the 'benefit of mankind,' and emphasis on international competitiveness, formed the basis of NASA's Mobile Satellite (MSAT) R&D and user experiments program to develop a commercial U.S. Mobile Satellite Service. Exemplifying this philosophy, the MSAT program targets the reduction of technical, regulatory, market, and financial risks that inhibit commercialization. The program strategy includes industry and user involvement in developing and demonstrating advanced technologies, regulatory advocacy, and financial incentives to industry. Approximately two decades of NASA's satellite communications development and demonstrations have contributed to the emergence of a new multi-billion dollar industry for land, aeronautical, and maritime mobile communications via satellite. NASA's R&D efforts are now evolving from the development of 'enabling' ground technologies for VHF, UHF, and L-Band mobile terminals, to Ka-Band terminals offering additional mobility and user convenience.

  6. SCaN Transportable Communication Platform (STCP)

    NASA Technical Reports Server (NTRS)

    Haddad, George; Tanger, Thomas; Pleva, David; Schoenholz, Bryan; Nam, Connor

    2017-01-01

    NASA Glenn Research Center required a satellite communication trailer that served dual purposes; 24/7 Emergency Communication Services (ECS) in the event of a natural or manmade disaster that disrupted conventional communications, and a Ka Band NASA TDRS capability providing a research capability for over the air evaluations/characterizations. The trailer was to be field deployable, environmentally controlled and self-contained providing local area networks (LANs) and Wide Area Networks (WAN's) with user access both wired (Ethernet) and wireless (802.11) supporting VoIP, Internet Web access and Email. The TDRSS terminal included a 200W TWT amplifier mounted on the feed boom, individual up and down converters, and custom integrated waveguide and a supporting feed system. Other features such as a mast, generator, electrical, lighting, surveillance, and storage capabilities were also required. The Trailer was developed and demonstrated these original requested capabilities. New Requirements are defined and the trailer is now being evolved and upgraded to be a backup for the Near- Earth Network (NEN) Stations at KSC that will support the launch phase of EM-1. This paper presents the current and future capabilities of the trailer and additional options that will make it a valuable deployable asset to support remote operations from any launch from location.

  7. MMIC Phased Array Demonstrations with ACTS

    NASA Technical Reports Server (NTRS)

    Raquet, Charles A. (Compiler); Martzaklis, Konstantinos (Compiler); Zakrajsek, Robert J. (Compiler); Andro, Monty (Compiler); Turtle, John P.

    1996-01-01

    Over a one year period from May 1994 to May 1995, a number of demonstrations were conducted by the NASA Lewis Research Center (LeRC) in which voice, data, and/or video links were established via NASA's advanced communications technology satellite (ACTS) between the ACTS link evaluation terminal (LET) in Cleveland, OH, and aeronautical and mobile or fixed Earth terminals having monolithic microwave integrated circuit (MMIC) phased array antenna systems. This paper describes four of these. In one, a duplex voice link between an aeronautical terminal on the LeRC Learjet and the ACTS was achieved. Two others demonstrated duplex voice (and in one case video as well) links between the ACTS and an Army vehicle. The fourth demonstrated a high data rate downlink from ACTS to a fixed terminal. Array antenna systems used in these demonstrations were developed by LeRC and featured LeRC and Air Force experimental arrays using gallium arsenide MMIC devices at each radiating element for electronic beam steering and distributed power amplification. The single 30 GHz transmit array was developed by NASA/LeRC and Texas Instruments. The three 20 GHz receive arrays were developed in a cooperative effort with the Air Force Rome Laboratory, taking advantage of existing Air Force array development contracts with Boeing and Lockheed Martin. The paper describes the four proof-of-concept arrays and the array control system. The system configured for each of the demonstrations is described, and results are discussed.

  8. V/STOL AND digital avionics system for UH-1H

    NASA Technical Reports Server (NTRS)

    Liden, S.

    1978-01-01

    A hardware and software system for the Bell UH-1H helicopter was developed that provides sophisticated navigation, guidance, control, display, and data acquisition capabilities for performing terminal area navigation, guidance and control research. Two Sperry 1819B general purpose digital computers were used. One contains the development software that performs all the specified system flight computations. The second computer is available to NASA for experimental programs that run simultaneously with the other computer programs and which may, at the push of a button, replace selected computer computations. Other features that provide research flexibility include keyboard selectable gains and parameters and software generated alphanumeric and CRT displays.

  9. Collision Avoidance for Airport Traffic Simulation Evaluation

    NASA Technical Reports Server (NTRS)

    Jones, Denise R.; Prinzel, Lawrence J., III; Shelton, Kevin J.; Bailey, Randall E.; Otero, Sharon D.; Barker, Glover D.

    2010-01-01

    A Collision Avoidance for Airport Traffic (CAAT) concept for the airport Terminal Maneuvering Area (TMA) was evaluated in a simulation study at the National Aeronautics and Space Administration (NASA) Langley Research Center. CAAT is being designed to enhance surface situation awareness and provide cockpit alerts of potential conflicts during runway, taxi, and low altitude air-to-air operations. The purpose of the study was to evaluate pilot reaction to conflict events in the TMA near the airport, different alert timings for various scenarios, alerting display concepts, and directive alerting concepts. This paper gives an overview of the conflict detection and resolution (CD&R) concept, simulation study, and test results

  10. Collision Avoidance for Airport Traffic Concept Evaluation

    NASA Technical Reports Server (NTRS)

    Jones, Denise R.; Prinzel, Lawrence J., III; Otero, Sharon D.; Barker, Glover D.

    2009-01-01

    An initial Collision Avoidance for Airport Traffic (CAAT) concept for the Terminal Maneuvering Area (TMA) was evaluated in a simulation study at the National Aeronautics and Space Administration (NASA) Langley Research Center. CAAT is being designed to enhance surface situation awareness and provide cockpit alerts of potential conflicts during runway, taxi, and low altitude air-to-air operations. The purpose of the study was to evaluate the initial concept for an aircraft-based method of conflict detection and resolution (CD&R) in the TMA focusing on conflict detection algorithms and alerting display concepts. This paper gives an overview of the CD&R concept, simulation study, and test results.

  11. KSC-07pd0494

    NASA Image and Video Library

    2007-02-22

    KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test activities. Here, Mission Specialists Steven Swanson (left) and Danny Olivas (right) practice exiting from the slidewire basket. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett

  12. KSC-07pd0493

    NASA Image and Video Library

    2007-02-22

    KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test activities. Here, Mission Specialists Steven Swanson (left) and Danny Olivas (right) practice exiting from the slidewire basket. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett

  13. KSC-07pd0495

    NASA Image and Video Library

    2007-02-22

    KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test activities. Here, Mission Specialist Steven Swanson (right) practices exiting from the slidewire basket. as Mission Specialist Danny Olivas assists. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett

  14. The Orlando TDWR testbed and airborne wind shear date comparison results

    NASA Technical Reports Server (NTRS)

    Campbell, Steven; Berke, Anthony; Matthews, Michael

    1992-01-01

    The focus of this talk is on comparing terminal Doppler Weather Radar (TDWR) and airborne wind shear data in computing a microburst hazard index called the F factor. The TDWR is a ground-based system for detecting wind shear hazards to aviation in the terminal area. The Federal Aviation Administration will begin deploying TDWR units near 45 airports in late 1992. As part of this development effort, M.I.T. Lincoln Laboratory operates under F.A.A. support a TDWR testbed radar in Orlando, FL. During the past two years, a series of flight tests has been conducted with instrumented aircraft penetrating microburst events while under testbed radar surveillance. These tests were carried out with a Cessna Citation 2 aircraft operated by the University of North Dakota (UND) Center for Aerospace Sciences in 1990, and a Boeing 737 operated by NASA Langley Research Center in 1991. A large data base of approximately 60 instrumented microburst penetrations has been obtained from these flights.

  15. STS_135_ M113

    NASA Image and Video Library

    2011-06-21

    JSC2011-E-059628 (21 June 2011) --- NASA astronaut Chris Ferguson, STS-135 commander, laughs with his crew members before safety training in the M113 personnel carrier during the Terminal Countdown Demonstration Test (TCDT) at NASA?s Kennedy Space Center on June 21, 2011. TCDT serves as the prelaunch countdown rehearsal for the final space shuttle mission, which is scheduled for launch on July 8. The M113 would be used in the event of an emergency at the pad forcing the crew to evacuate. Photo credit: NASA Photo/Houston Chronicle, Smiley N. Pool

  16. Alexander Archipelago, Southeastern Alaska

    NASA Technical Reports Server (NTRS)

    2002-01-01

    West of British Columbia, Canada, and south of the Yukon Territory, the southeastern coastline of Alaska trails off into the islands of the Alexander Archipelago. The area is rugged and contains many long, U-shaped, glaciated valleys, many of which terminate at tidewater. The Alexander Archipelago is home to Glacier Bay National Park. The large bay that has two forks on its northern end is Glacier Bay itself. The eastern fork is Muir inlet, into which runs the Muir glacier, named for the famous Scottish-born naturalist John Muir. Glacier Bay opens up into the Icy Strait. The large, solid white area to the west is Brady Icefield, which terminates at the southern end in Brady's Glacier. To locate more interesting features from Glacier Bay National Park, take a look at the park service map. As recently as two hundred years ago, a massive ice field extended into Icy Strait and filled the Glacier Bay. Since that time, the area has experienced rapid deglaciation, with many large glaciers retreating 40, 60, even 80 km. While temperatures have increased in the region, it is still unclear whether the rapid recession is part of the natural cycle of tidewater glaciers or is an indicator of longer-term climate change. For more on Glacier Bay and climate change, read an online paper by Dr. Dorothy Hall, a MODIS Associate Science Team Member. Credit: Jacques Descloitres, MODIS Land Rapid Response Team, NASA/GSFC

  17. Concept of Operations for the Next Generation Air Transportation System. Version 3.2

    DTIC Science & Technology

    2011-01-01

    Airside. Security Identification Display Area/Airport ( SIDA ) operations area, terminal perimeter, terminal airspace (security) • Landside. Terminal...Definition RTSS Remote Terminal Security Screening SAA Special Activity Airspace SIDA Security Identification Display Area SM Separation Management

  18. A NASA/University Joint Venture in Space Science (JOVE)

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Most aspects of the JOVE program at Harding University were very successful. The number and quality of students interested in space science areas was increased due to the availability of support funds for JOVE scholars. Both physics faculty associated with the program have continued work in areas associated with the JOVE program. Several additional research grants for student research and scholarship support have been received from the Arkansas Space Grant Consortium since the termination of the JOVE program. The network connection established has been used extensively for educational and research purposes in connection with awarded grants and with science education at Harding University. The major unsuccessful area was in obtaining external funding in the area of solar physics in which Harding's JOVE program was working and in not more aggressively pursuing communication and cooperative effort with our JOVE mentor. This has resulted in all of the associated JOVE faculty no longer working in the solar physics area. The JOVE program has contributed significantly to the success of faculty programs in other areas that were fundable.

  19. Commercial applications of the ACTS mobile terminal millimeter-wave antennas

    NASA Technical Reports Server (NTRS)

    Densmore, Arthur C.; Crist, Rick A.; Jamnejad, Vahraz; Tulintseff, Ann N.

    1991-01-01

    NASA's Jet Propulsion Laboratory is currently developing the Advanced Communications Technology Satellite (ACTS) Mobile Terminal (AMT), which will provide voice, data, and video communications to and from a vehicle (van, truck, or car) via NASA's geostationary ACTS satellite using the K- and K(sub a)-band frequency bands. The AMT is already planned to demonstrate a variety of communications from within the mobile vehicular environment, and within this paper a summary of foreseen commercial application opportunities is given. A critical component of the AMT is its antenna system, which must establish and maintain the basic RF link with the satellite. Two versions of the antenna are under development, each incorporating different technologies and offering different commercial applications.

  20. Statistical Engineering in Air Traffic Management Research

    NASA Technical Reports Server (NTRS)

    Wilson, Sara R.

    2015-01-01

    NASA is working to develop an integrated set of advanced technologies to enable efficient arrival operations in high-density terminal airspace for the Next Generation Air Transportation System. This integrated arrival solution is being validated and verified in laboratories and transitioned to a field prototype for an operational demonstration at a major U.S. airport. Within NASA, this is a collaborative effort between Ames and Langley Research Centers involving a multi-year iterative experimentation process. Designing and analyzing a series of sequential batch computer simulations and human-in-the-loop experiments across multiple facilities and simulation environments involves a number of statistical challenges. Experiments conducted in separate laboratories typically have different limitations and constraints, and can take different approaches with respect to the fundamental principles of statistical design of experiments. This often makes it difficult to compare results from multiple experiments and incorporate findings into the next experiment in the series. A statistical engineering approach is being employed within this project to support risk-informed decision making and maximize the knowledge gained within the available resources. This presentation describes a statistical engineering case study from NASA, highlights statistical challenges, and discusses areas where existing statistical methodology is adapted and extended.

  1. KSC-2010-1311

    NASA Image and Video Library

    2010-01-19

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission pose for a group portrait following the completion of their M113 training. From top left are Mission Specialists Stephen Robinson and Nicholas Patrick. From bottom left are Mission Specialist Robert Behnken; Pilot Terry Virts; Mission Specialist Kathryn Hire; and Commander George Zamka. An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed. The crew members of Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. Endeavour's launch is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Kim Shiflett

  2. Bank Terminals

    NASA Technical Reports Server (NTRS)

    1978-01-01

    In the photo, employees of the UAB Bank, Knoxville, Tennessee, are using Teller Transaction Terminals manufactured by SCI Systems, Inc., Huntsville, Alabama, an electronics firm which has worked on a number of space projects under contract with NASA. The terminals are part of an advanced, computerized financial transaction system that offers high efficiency in bank operations. The key to the system's efficiency is a "multiplexing" technique developed for NASA's Space Shuttle. Multiplexing is simultaneous transmission of large amounts of data over a single transmission link at very high rates of speed. In the banking application, a small multiplex "data bus" interconnects all the terminals and a central computer which stores information on clients' accounts. The data bus replaces the maze-of wiring that would be needed to connect each terminal separately and it affords greater speed in recording transactions. The SCI system offers banks real-time data management through constant updating of the central computer. For example, a check is immediately cancelled at the teller's terminal and the computer is simultaneously advised of the transaction; under other methods, the check would be cancelled and the transaction recorded at the close of business. Teller checkout at the end of the day, conventionally a time-consuming matter of processing paper, can be accomplished in minutes by calling up a summary of the day's transactions. SCI manufactures other types of terminals for use in the system, such as an administrative terminal that provides an immediate printout of a client's account, and another for printing and recording savings account deposits and withdrawals. SCI systems have been installed in several banks in Tennessee, Arizona, and Oregon and additional installations are scheduled this year.

  3. NASA work unit system file maintenance manual

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

  4. Flight Test Analysis of the Forces and Moments Imparted on a B737-100 Aircraft During Wake Vortex Encounters

    NASA Technical Reports Server (NTRS)

    Roberts, Christopher L.; Smith, Sonya T.; Vicroy, Dan D.

    2000-01-01

    Several of our major airports are operating at or near their capacity limit, increasing congestion and delays for travelers. As a result, the National Aeronautics and Space Administration (NASA) has been working in conjunction with the Federal Aviation Administration (FAA), airline operators, and the airline industry to increase airport capacity and safety. As more and more airplanes are placed into the terminal area the probability of encountering wake turbulence is increased. The NASA Langley Research Center conducted a series of flight tests from 1995 through 1997 to develop a wake encounter and wake-measurement data set with the accompanying atmospheric state information. The purpose of this research is to use the data from those flights to compute the wake-induced forced and moments exerted on the aircraft The calculated forces and moments will then be compiled into a database that can be used by wake vortex researchers to compare with experimental and computational results.

  5. Monitoring California's forage resource using ERTS-1 and supporting aircraft data

    NASA Technical Reports Server (NTRS)

    Carneggie, D. M.; Degloria, S. D.

    1973-01-01

    NASA's Earth Resource Technology Satellite (ERTS-1) launched July 23, 1972, offers for the first time the unique capabilities for regional monitoring of forage plant conditions. The repetitive coverage every 18 days, the synoptic view and the real-time recovery of the imagery for immediate analysis, combine to make the ERTS satellite a valuable tool for improving the evaluation of our rangeland resources. Studies presently underway at the University of California, Berkeley (sponsored jointly by NASA and the Bureau of Land Management), seek to determine if imagery obtained from high altitude aircraft and spacecraft (ERTS) can provide: (1) a means for monitoring the growth and development of annual and perennial range plants in California, and for determining the time and the rate of initial plant growth (germination) and terminal plant growth (maturation and senescence); (2) a means for determining or predicting the relative amount of forage that is produced; and (3) a means for mapping rangeland areas having different forage producing capabilities.

  6. Radar Reflectivity in Wingtip-Generated Wake Vortices

    NASA Technical Reports Server (NTRS)

    Marshall, Robert E.; Mudukutore, Ashok; Wissel, Vicki

    1997-01-01

    This report documents new predictive models of radar reflectivity, with meter-scale resolution, for aircraft wakes in clear air and fog. The models result from a radar design program to locate and quantify wake vortices from commercial aircraft in support of the NASA Aircraft Vortex Spacing System (AVOSS). The radar reflectivity model for clear air assumes: 1) turbulent eddies in the wake produce small discontinuities in radar refractive index; and 2) these turbulent eddies are in the 'inertial subrange' of turbulence. From these assumptions, the maximum radar frequency for detecting a particular aircraft wake, as well as the refractive index structure constant and radar volume reflectivity in the wake can be obtained from the NASA Terminal Area Simulation System (TASS) output. For fog conditions, an empirical relationship is used to calculate radar reflectivity factor from TASS output of bulk liquid water. Currently, two models exist: 1) Atlas-based on observations of liquid water and radar reflectivity factor in clouds; and 2) de Wolf- specifically tailored to a specific measured dataset (1992 Vandenberg Air Force Base).

  7. Dawn Survey Orbit Image 38

    NASA Image and Video Library

    2015-07-31

    This image, taken by NASA's Dawn spacecraft, shows cratered terrain near the day-night line, called the terminator, on dwarf planet Ceres. The image, with a resolution of 1,400 feet (410 meters) per pixel, was taken at an altitude of 2,700 miles (4,400 kilometers) on June 24, 2015. http://photojournal.jpl.nasa.gov/catalog/PIA19611

  8. NASA TLA workload analysis support. Volume 3: FFD autopilot scenario validation data

    NASA Technical Reports Server (NTRS)

    Sundstrom, J. L.

    1980-01-01

    The data used to validate a seven time line analysis of forward flight deck autopilot mode for the pilot and copilot for NASA B737 terminal configured vehicle are presented. Demand workloads are given in two forms: workload histograms and workload summaries (bar graphs). A report showing task length and task interaction is also presented.

  9. The 5th Meeting of the Ad Hoc Panel on Terminal Configured Vehicles

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A report of the fifth meeting of the NASA Research and Technology Advisory Council, Ad Hoc panel on Terminal Configured Vehicles is presented. Some of the following topics were discussed; (1) microwave landing systems; (2) whole word computer system status; (3) flight path angle control: (4) VTOL approaches and landing technology; and (5) simulation study in wind shear.

  10. Performance of the NASA Airborne Radar with the Windshear Database for Forward-Looking Systems

    NASA Technical Reports Server (NTRS)

    Switzer, George F.; Britt, Charles L.

    1996-01-01

    This document describes the simulation approach used to test the performance of the NASA airborne windshear radar. An explanation of the actual radar hardware and processing algorithms provides an understanding of the parameters used in the simulation program. This report also contains a brief overview of the NASA airborne windshear radar experimental flight test results. A description of the radar simulation program shows the capabilities of the program and the techniques used for certification evaluation. Simulation of the NASA radar is comprised of three steps. First, the choice of the ground clutter data must be made. The ground clutter is the return from objects in or nearby an airport facility. The choice of the ground clutter also dictates the aircraft flight path since ground clutter is gathered while in flight. The second step is the choice of the radar parameters and the running of the simulation program which properly combines the ground clutter data with simulated windshear weather data. The simulated windshear weather data is comprised of a number of Terminal Area Simulation System (TASS) model results. The final step is the comparison of the radar simulation results to the known windshear data base. The final evaluation of the radar simulation is based on the ability to detect hazardous windshear with the aircraft at a safe distance while at the same time not displaying false alerts.

  11. Moments after release from NASA's B-52 carrier aircraft, the X-43A/Pegasus "stack" is seen before ignition of the Pegasus rocket motor on

    NASA Image and Video Library

    2001-06-02

    The first X-43A hypersonic research aircraft and its modified Pegasus booster rocket were carried aloft by NASA's NB-52B carrier aircraft from Dryden Flight Research Center at Edwards Air Force Base, Calif., on June 2, 2001 for the first of three high-speed free flight attempts. About an hour and 15 minutes later the Pegasus booster was released from the B-52 to accelerate the X-43A to its intended speed of Mach 7. Before this could be achieved, the combined Pegasus and X-43A "stack" lost control about eight seconds after ignition of the Pegasus rocket motor. The mission was terminated and explosive charges ensured the Pegasus and X-43A fell into the Pacific Ocean in a cleared Navy range area. A NASA investigation board is being assembled to determine the cause of the incident. Work continues on two other X-43A vehicles, the first of which could fly by late 2001. Central to the X-43A program is its integration of an air-breathing "scramjet" engine that could enable a variety of high-speed aerospace craft, and promote cost-effective access to space. The 12-foot, unpiloted research vehicle was developed and built for NASA by MicroCraft Inc., Tullahoma, Tenn. The booster was built by Orbital Sciences Corp. at Chandler, Ariz.

  12. X-43A departs NASA Dryden Flight Research Center for first free-flight attempt

    NASA Image and Video Library

    2001-06-02

    The first X-43A hypersonic research aircraft and its modified Pegasus booster rocket were carried aloft by NASA's NB-52B carrier aircraft from Dryden Flight Research Center at Edwards Air Force Base, Calif., on June 2, 2001 for the first of three high-speed free flight attempts. About an hour and 15 minutes later the Pegasus booster was released from the B-52 to accelerate the X-43A to its intended speed of Mach 7. Before this could be achieved, the combined Pegasus and X-43A "stack" lost control about eight seconds after ignition of the Pegasus rocket motor. The mission was terminated and explosive charges ensured the Pegasus and X-43A fell into the Pacific Ocean in a cleared Navy range area. A NASA investigation board is being assembled to determine the cause of the incident. Work continues on two other X-43A vehicles, the first of which could fly by late 2001. Central to the X-43A program is its integration of an air-breathing "scramjet" engine that could enable a variety of high-speed aerospace craft, and promote cost-effective access to space. The 12-foot, unpiloted research vehicle was developed and built for NASA by MicroCraft Inc., Tullahoma, Tenn. The booster was built by Orbital Sciences Corp. at Chandler, Ariz.

  13. Sensitivity of Runway Occupancy Time (ROT) to Various Rollout and Turnoff (ROTO) Factors. Volume 1

    NASA Technical Reports Server (NTRS)

    Goldthorpe, S. H.

    1997-01-01

    The Terminal Area Productivity (TAP) research program was initiated by NASA to increase the airport capacity for transport aircraft operations. One element of the research program is called Low Visibility Landing and Surface Operations (LVLASO). A goal of the LVLASO research is to develop transport aircraft technologies which reduce Runway Occupancy Time (ROT) so that it does not become the limiting factor in the terminal area operations that determine the capacity of a runway. Under LVLASO, the objective of this study was to determine the sensitivity of ROT to various factors associated with the Rollout and Turnoff (ROTO) operation for transport aircraft. The following operational factors were studied and are listed in the order of decreasing ROT sensitivity: ice/flood runway surface condition, exit entrance ground speed, number of exits, high-speed exit locations and spacing, aircraft type, touchdown ground speed standard deviation, reverse thrust and braking method, accurate exit prediction capability, maximum reverse thrust availability, spiral-arc vs. circle-arc exit geometry, dry/slush/wet/snow runway surface condition, maximum allowed deceleration, auto asymmetric braking on exit, do not stow reverse thrust before the exit, touchdown longitudinal location standard deviation, flap setting, anti-skid efficiency, crosswind conditions, stopping on the exit and touchdown lateral offset.

  14. Sensitivity of Runway Occupancy Time (ROT) to Various Rollout and Turnoff (ROTO) Factors. Volume 2; Complete Set of Plotted Data

    NASA Technical Reports Server (NTRS)

    Goldthorpe, S. H.

    1997-01-01

    The Terminal Area Productivity (TAP) research program was initiated by NASA to increase the airport capacity for transport aircraft operations. One element of the research program is called Low Visibility Landing and Surface Operations (LVLASO). A goal of the LVLASO research is to develop transport aircraft technologies which reduce Runway Occupancy Time (ROT) so that it does not become the limiting factor in the terminal area operations that determine the capacity of a runway. Under LVLASO, the objective of this study was to determine the sensitivity of ROT to various factors associated with the Rollout and Turnoff (ROTO) operation for transport aircraft. The following operational factors were studied and are listed in the order of decreasing ROT sensitivity: ice/flood runway surface condition, exit entrance ground speed, number of exits, high-speed exit locations and spacing, aircraft type, touchdown ground speed standard deviation, reverse thrust and braking method, accurate exit prediction capability, maximum reverse thrust availability, spiral-arc vs. circle-arc exit geometry, dry/slush/wet/snow runway surface condition, maximum allowed deceleration, auto asymmetric braking on exit, do not stow reverse thrust before the exit, touchdown longitudinal location standard deviation, flap setting, anti-skid efficiency, crosswind conditions, stopping on the exit and touchdown lateral offset.

  15. The Impact of Data Communications Messages in the Terminal Area on Flight Crew Workload and Eye Scanning

    NASA Technical Reports Server (NTRS)

    Comstock, James R., Jr.; Baxley, Brian T.; Norman, Robert M.; Ellis, Kyle K. E.; Adams, Cathy A.; Latorella, Kara A.; Lynn, William A.

    2010-01-01

    This paper, to accompany a discussion panel, describes a collaborative FAA and NASA research study to determine the effect Data Communications (Data Comm) messages have on flight crew workload and eye scanning behavior in busy terminal area operations. In the Next Generation Air Transportation System Concept of Operations, for the period 2017-2022, the FAA envisions Data Comm between controllers and the flight crew to become the primary means of communicating non-time critical information. Four research conditions were defined that span current day to future equipage levels (Voice with Paper map, Data Comm with Paper map, Data Comm with Moving Map Display with ownship position displayed, Data Comm with Moving Map, ownship and taxi route displayed), and were used to create arrival and departure scenarios at Boston Logan Airport. Preliminary results for workload, situation awareness, and pilot head-up time are presented here. Questionnaire data indicated that pilot acceptability, workload, and situation awareness ratings were favorable for all of the conditions tested. Pilots did indicate that there were times during final approach and landing when they would prefer not to hear the message chime, and would not be able to make a quick response due to high priority tasks in the cockpit.

  16. KSC-06pd0686

    NASA Image and Video Library

    2006-04-18

    CINCINNATI, OHIO - NASA Administrator Michael Griffin presented the NASA Ambassadors of Exploration award to Neil Armstrong (left). At right is former awardee John Glenn. Armstrong received the award that includes a moon rock to recognize the sacrifices and dedication of the astronauts and others who were part of the Mercury, Gemini and Apollo programs. A former naval aviator, NASA test pilot and Apollo 11 commander, Armstrong was the first human to ever land a spacecraft on the moon and the first to step on the lunar surface. Armstrong's award will be displayed at the Cincinnati Museum Center at Union Terminal. Photo credit: NASA/Bill Ingalls

  17. KSC-06pd0687

    NASA Image and Video Library

    2006-04-18

    CINCINNATI, OHIO - Former astronaut Neil Armstrong stands next to the NASA Ambassadors of Exploration award presented to him by NASA Administrator Michael Griffin. Armstrong received the award that includes a moon rock to recognize the sacrifices and dedication of the astronauts and others who were part of the Mercury, Gemini and Apollo programs. A former naval aviator, NASA test pilot and Apollo 11 commander, Armstrong was the first human to ever land a spacecraft on the moon and the first to step on the lunar surface. Armstrong's award will be displayed at the Cincinnati Museum Center at Union Terminal. Photo credit: NASA/Bill Ingalls

  18. NASA's K/Ka-Band Broadband Aeronautical Terminal for Duplex Satellite Video Communications

    NASA Technical Reports Server (NTRS)

    Densmore, A.; Agan, M.

    1994-01-01

    JPL has recently begun the development of a Broadband Aeronautical Terminal (BAT) for duplex video satellite communications on commercial or business class aircraft. The BAT is designed for use with NASA's K/Ka-band Advanced Communications Technology Satellite (ACTS). The BAT system will provide the systems and technology groundwork for an eventual commercial K/Ka-band aeronautical satellite communication system. With industry/government partnerships, three main goals will be addressed by the BAT task: 1) develop, characterize and demonstrate the performance of an ACTS based high data rate aeronautical communications system; 2) assess the performance of current video compression algorithms in an aeronautical satellite communication link; and 3) characterize the propagation effects of the K/Ka-band channel for aeronautical communications.

  19. Flight-test evaluation of civil helicopter terminal approach operations using differential GPS

    NASA Technical Reports Server (NTRS)

    Edwards, F. G.; Hegarty, D. M.

    1989-01-01

    A civil code differential Global Positioning System (DGPS) has been developed and flight-tested by the NASA Ames Research Center. The system was used to evaluate the performance of the DGPS for support of helicopter terminal approach operations. The airborne component of the DGPS was installed in a NASA helicopter. The ground-reference component was installed in a mobile van and equipped with a real-time VHF telemetry data link to transmit correction information to the aircraft system. An extensive series of tests was conducted to evaluate the performance of the system for several different configurations of the airborne navigation filter. This paper will describe the systems, the results of the flight tests, and the results of the posttest analysis.

  20. Fault-tolerant onboard digital information switching and routing for communications satellites

    NASA Technical Reports Server (NTRS)

    Shalkhauser, Mary JO; Quintana, Jorge A.; Soni, Nitin J.; Kim, Heechul

    1993-01-01

    The NASA Lewis Research Center is developing an information-switching processor for future meshed very-small-aperture terminal (VSAT) communications satellites. The information-switching processor will switch and route baseband user data onboard the VSAT satellite to connect thousands of Earth terminals. Fault tolerance is a critical issue in developing information-switching processor circuitry that will provide and maintain reliable communications services. In parallel with the conceptual development of the meshed VSAT satellite network architecture, NASA designed and built a simple test bed for developing and demonstrating baseband switch architectures and fault-tolerance techniques. The meshed VSAT architecture and the switching demonstration test bed are described, and the initial switching architecture and the fault-tolerance techniques that were developed and tested are discussed.

  1. V/STOLAND avionics system flight-test data on a UH-1H helicopter

    NASA Technical Reports Server (NTRS)

    Baker, F. A.; Jaynes, D. N.; Corliss, L. D.; Liden, S.; Merrick, R. B.; Dugan, D. C.

    1980-01-01

    The flight-acceptance test results obtained during the acceptance tests of the V/STOLAND (versatile simplex digital avionics system) digital avionics system on a Bell UH-1H helicopter in 1977 at Ames Research Center are presented. The system provides navigation, guidance, control, and display functions for NASA terminal area VTOL research programs and for the Army handling qualities research programs at Ames Research Center. The acceptance test verified system performance and contractual acceptability. The V/STOLAND hardware navigation, guidance, and control laws resident in the digital computers are described. Typical flight-test data are shown and discussed as documentation of the system performance at acceptance from the contractor.

  2. KSC-07pd0491

    NASA Image and Video Library

    2007-02-22

    KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test activities. From left are Commander Rick Sturckow, Mission Specialist Patrick Forrester, Pilot Lee Archambault, and Mission Specialists Danny Olivas, Steven Swanson and James Reilly. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett

  3. KSC-07pd0492

    NASA Image and Video Library

    2007-02-22

    KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test activities. From left are Commander Rick Sturckow, Mission Specialists Patrick Forrester and Danny Olivas, Pilot Lee Archambault, and Mission Specialists James Reilly and Steven Swanson. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett

  4. A software control system for the ACTS high-burst-rate link evaluation terminal

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Daugherty, Elaine S.

    1991-01-01

    Control and performance monitoring of NASA's High Burst Rate Link Evaluation Terminal (HBR-LET) is accomplished by using several software control modules. Different software modules are responsible for controlling remote radio frequency (RF) instrumentation, supporting communication between a host and a remote computer, controlling the output power of the Link Evaluation Terminal and data display. Remote commanding of microwave RF instrumentation and the LET digital ground terminal allows computer control of various experiments, including bit error rate measurements. Computer communication allows system operators to transmit and receive from the Advanced Communications Technology Satellite (ACTS). Finally, the output power control software dynamically controls the uplink output power of the terminal to compensate for signal loss due to rain fade. Included is a discussion of each software module and its applications.

  5. Enhanced Flight Termination System (EFTS): Flight Demonstration and Results

    NASA Technical Reports Server (NTRS)

    Tow, David; Arce, Dennis

    2008-01-01

    The Enhanced Flight Termination System (EFTS) program was initiated and propelled due to the inadvertent terminations of Global Hawk and the Strategic Target System and the NASA Inspector General's assessment letter and recommendations regarding the exploration of low-cost, lightweight space COMSEC for FTS. Additionally, the standard analog and high alphabet systems most commonly used in FTS are secure, but not encrypted. A study group was initiated to select and document a robust, affordable, reliable technology that provides encrypted FTS capability. A flight demonstration was conducted to gain experience using EFTS in an operational environment, provide confidence in the use of the EFTS components, integrate EFTS into an existing range infrastructure to demonstrate the scalability of system components, to provide a command controller that generated the EFTS waveform using an existing range infrastructure, and to provide a report documenting the results of the demonstration. The primary goal of the demonstration was to obtain operational experience with EFTS. Areas of operational experience include: mission planning, pre-flight configuration and testing, mission monitoring and recording, vehicle termination, developing mission procedures. and post mission data reduction and other post mission activities. An Advanced Medium-Range Air-to-Air Missile (AMRAAM) was selected to support the EFTS demonstration due to interest in future use of EFTS by the AMRAAM program, familiarity of EFTS by range personnel, and the availability of existing operational environment to support EFTS testing with available program funding. For demonstration purposes, the AMRAAM was successfully terminated using an EFTS receiver and successfully demonstrating EFTS. The EFTS monitoring software with spectrum analyzer and digital graphical display of aircraft, missile, and target were also demonstrated.

  6. 33 CFR 334.1050 - Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.1050 Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. (a...

  7. 33 CFR 334.1050 - Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.1050 Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. (a...

  8. 33 CFR 334.1050 - Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.1050 Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. (a...

  9. 33 CFR 334.1050 - Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.1050 Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. (a...

  10. 33 CFR 334.1050 - Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.1050 Oakland Outer Harbor adjacent to the Military Ocean Terminal, Bay Area, Pier No. 8 (Port of Oakland Berth No. 10); restricted area. (a...

  11. Identification, definition and mapping of terrestrial ecosystems in interior Alaska. [vegetation, land use, glaciology

    NASA Technical Reports Server (NTRS)

    Anderson, J. H. (Principal Investigator)

    1973-01-01

    The author has identified the following significant results. The vegetation map in preparation at the time of the last report was refined and labeled. This map is presented as an indication of the spatial and classificatory detail possible from interpretations of enlarged ERTS-1 color photographs. Using this map, areas covered by the several vegetation types characterized by white spruce were determined by planimetry. A 1:63,360 scale land use map of the Juneau area was drawn. This map incorporates the land use classification system now under development by the U.S. Geological Survey. The ERTS-1 images used in making the Juneau map were used to determine changes in surface area of the terminal zones of advancing and receding glaciers, the Taku, Norris, and Mendenhall. A new 1:63,360 scale land use map of the Bonanza Creek Experimental Forest and vicinity was drawn. Several excellent new sciences of test areas were received from NASA in color-infrared transparency format. These are being used for making photographic prints for analysis and mapping according to procedures outlined in this report.

  12. Lunar Communication Terminals for NASA Exploration Missions: Needs, Operations Concepts and Architectures

    NASA Technical Reports Server (NTRS)

    Bhasin, Kul B.; Warner, Joseph D.; Anderson, Lynn M.

    2008-01-01

    NASA is conducting architecture studies prior to deploying a series of short- and long-duration human and robotic missions for the exploration of the Moon and Mars under the Vision for Space Exploration Initiative. A key objective of these missions is to establish and expand, through a series of launches, a system of systems approach to exploration capabilities and science return. The systems identified were Crew Exploration Vehicles, crew and cargo launch vehicles, crew EVA suits, crew and cargo landers, habitats, mobility carriers, and small, pressurized rovers. Multiple space communication networks and systems, deployed over time, will support these space exploration systems of systems. Each deployment phase will support interoperability of components and provide 20 years of legacy systems. In this paper, we describe the modular lunar communications terminals needed for the emerging lunar mission operational scenarios. These lunar communication terminals require flexibility for use in stationary, integrated, and mobile environments. They will support links directly to Earth, to lunar relay satellites, to astronauts and to fixed and mobile lunar surface systems. The operating concepts and traffic models are presented for these terminals within variety of lunar scenarios. A preliminary architecture is outlined, providing for suitable long-duration operations in the harsh lunar environment.

  13. Space Shuttle Discovery Landing

    NASA Image and Video Library

    2012-04-17

    Space shuttle Discovery, mounted atop a NASA 747 Shuttle Carrier Aircraft (SCA) taxis in front of the main terminal at Washington Dulles International Airport, Tuesday, April 17, 2012, in Sterling, Va. Discovery, the first orbiter retired from NASA’s shuttle fleet, completed 39 missions, spent 365 days in space, orbited the Earth 5,830 times, and traveled 148,221,675 miles. NASA will transfer Discovery to the National Air and Space Museum to begin its new mission to commemorate past achievements in space and to educate and inspire future generations of explorers. Photo Credit: (NASA/Smithsonian Institution/Eric Long)

  14. Design of an Aircraft Vortex Spacing System for Airport Capacity Improvement

    NASA Technical Reports Server (NTRS)

    Hinton, David A.; Charnock, James K.; Bagwell, Donald R.

    2000-01-01

    The National Aeronautics and Space Administration (NASA) is addressing airport capacity enhancements through the Terminal Area Productivity (TAP) program. Within TAP, the Reduced Spacing Operations element at the NASA Langley Research Center is developing an Aircraft VOrtex Spacing System (AVOSS). AVOSS will integrate the output of several systems to produce weather dependent, dynamic wake vortex spacing criteria. These systems provide current and predicted weather conditions, models of wake vortex transport and decay in these weather conditions, and real-time feedback of wake vortex behavior from sensors. The goal of the NASA program is to provide the research and development to demonstrate an engineering model AVOSS, in real-time operation, at a major airport. A wake vortex system test facility was established at the Dallas-Fort Worth International Airport (DFW) in 1997 and tested in 1998. Results from operation of the initial AVOSS system, plus advances in wake vortex prediction and near-term weather forecast models, "nowcast", have been integrated into a second-generation system. This AVOSS version is undergoing final checkout in preparation for a system demonstration in 2000. This paper describes the revised AVOSS system architecture, subsystem enhancements, and initial results with AVOSS version 2 from a deployment at DFW in the fall of 1999.

  15. KSC-2010-1287

    NASA Image and Video Library

    2010-01-18

    CAPE CANAVERAL, Fla. - The crew of space shuttle Endeavour's STS-130 mission poses for a group portrait following their arrival at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. From left are Mission Specialists Robert Behnken, Nicholas Patrick, Stephen Robinson and Kathryn Hire; Pilot Terry Virts; and Commander George Zamka. The crew is at Kennedy to participate in training and a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test. The primary payload for the STS-130 mission is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency. Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Kim Shiflett

  16. Overview and Status of the Lunar Laser Communication Demonstration

    NASA Technical Reports Server (NTRS)

    Boroson, D. M.; Robinson, B. S.; Burianek, D. A.; Murphy, D. V.; Biswas, A.

    2012-01-01

    The Lunar Laser Communication Demonstration (LLCD), a project being undertaken by MIT Lincoln Laboratory, NASA's Goddard Space Flight Center, and the Jet Propulsion Laboratory, will be NASA's first attempt to demonstrate optical communications between a lunar orbiting spacecraft and Earth-based ground receivers. The LLCD space terminal will be flown on the Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft, presently scheduled to launch in 2013. LLCD will demonstrate downlink optical communications at rates up to 620 Mbps, uplink optical communications at rates up to 20 Mbps, and two-way time-of-flight measurements with the potential to perform ranging with sub-centimeter accuracy. We describe the objectives of the LLCD program, key technologies employed in the space and ground terminals, and show the status of development of the several systems.

  17. Psychological Usability of Layered Application Software Platforms

    NASA Technical Reports Server (NTRS)

    Uhiarik, John

    1999-01-01

    This grant provided Graduate Research Fellowship Program support to James Michael Herold to obtain a graduate degree from the Department of Psychology at Kansas State University and conduct usability testing of graphical user interfaces the Kennedy Space Center. The student independently took an additional internship at Boll Laboratories without informing his graduate advisor or the Department of Psychology. Because he was NOT making progress toward his degree, he elected not to pursue his graduate studies at Kansas State University and self-terminated from the program (spin without informing his advisor or the Department of Psychology]. What he accomplished for NASA in terms of usability testing at the Kennedy Space Center is unclear. NASA terminated support for the project: 07/30/99, including a $4,000 commitment to provide infrastructure support to the Department of Psychology.

  18. Development of the multiwavelength monolithic integrated fiber optics terminal

    NASA Technical Reports Server (NTRS)

    Chubb, C. R.; Bryan, D. A.; Powers, J. K.; Rice, R. R.; Nettle, V. H.; Dalke, E. A.; Reed, W. R.

    1982-01-01

    This paper describes the development of the Multiwavelength Monolithic Integrated Fiber Optic Terminal (MMIFOT) for the NASA Johnson Space Center. The program objective is to utilize guided wave optical technology to develop wavelength-multiplexing and -demultiplexing units, using a single mode optical fiber for transmission between terminals. Intensity modulated injection laser diodes, chirped diffraction gratings and thin film lenses are used to achieve the wavelength-multiplexing and -demultiplexing. The video and audio data transmission test of an integrated optical unit with a Luneburg collimation lens, waveguide diffraction grating and step index condensing lens is described.

  19. ALSEP termination report

    NASA Technical Reports Server (NTRS)

    Bates, J. R.; Lauderdale, W. W.; Kernaghan, H.

    1979-01-01

    The Apollo Lunar Surface Experiments Package (ALSEP) final report was prepared when support operations were terminated September 30, 1977, and NASA discontinued the receiving and processing of scientific data transmitted from equipment deployed on the lunar surface. The ALSEP experiments (Apollo 11 to Apollo 17) are described and pertinent operational history is given for each experiment. The ALSEP data processing and distribution are described together with an extensive discussion on archiving. Engineering closeout tests and results are given, and the status and configuration of the experiments at termination are documented. Significant science findings are summarized by selected investigators. Significant operational data and recommendations are also included.

  20. Advanced communications technology satellite high burst rate link evaluation terminal communication protocol software user's guide, version 1.0

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.

    1993-01-01

    The Communication Protocol Software was developed at the NASA Lewis Research Center to support the Advanced Communications Technology Satellite High Burst Rate Link Evaluation Terminal (ACTS HBR-LET). The HBR-LET is an experimenters terminal to communicate with the ACTS for various experiments by government, university, and industry agencies. The Communication Protocol Software is one segment of the Control and Performance Monitor (C&PM) Software system of the HBR-LET. The Communication Protocol Software allows users to control and configure the Intermediate Frequency Switch Matrix (IFSM) on board the ACTS to yield a desired path through the spacecraft payload. Besides IFSM control, the C&PM Software System is also responsible for instrument control during HBR-LET experiments, uplink power control of the HBR-LET to demonstrate power augmentation during signal fade events, and data display. The Communication Protocol Software User's Guide, Version 1.0 (NASA CR-189162) outlines the commands and procedures to install and operate the Communication Protocol Software. Configuration files used to control the IFSM, operator commands, and error recovery procedures are discussed. The Communication Protocol Software Maintenance Manual, Version 1.0 (NASA CR-189163, to be published) is a programmer's guide to the Communication Protocol Software. This manual details the current implementation of the software from a technical perspective. Included is an overview of the Communication Protocol Software, computer algorithms, format representations, and computer hardware configuration. The Communication Protocol Software Test Plan (NASA CR-189164, to be published) provides a step-by-step procedure to verify the operation of the software. Included in the Test Plan is command transmission, telemetry reception, error detection, and error recovery procedures.

  1. Use of Data Comm by Flight Crew in High-Density Terminal Areas

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Norman, Robert M.; Ellis, Kyle K. E.; Latorella, Kara A.; Comstock, James R.; Adams, Cathy A.

    2010-01-01

    This paper describes a collaborative FAA and NASA experiment using 22 commercial airline pilots to determine the effect of using Datalink Communication (Data Comm) to issue messages in busy, terminal area operations. Four conditions were defined that span current day to future flight deck equipage levels (voice communication only, Data Comm only, Data Comm with Moving Map Display, Data Comm with Moving Map displaying taxi route), and each condition was used to create an arrival and a departure scenario at the Boston Logan Airport. These eight scenarios were repeated twice for a total of 16 scenarios for each of the eleven crews. Quantitative data was collected on subject reaction time and eye tracking information. Questionnaires collected subjective feedback on workload and acceptability to the flight crew for using Data Comm in a busy terminal area. 95% of the Data Comm messages were responded to by the flight crew within one minute; however, post experiment debrief comments revealed almost unanimous consensus that two minutes was a reasonable expectation for crew response. Eye tracking data indicated an insignificant decrease in head-up time for the Pilot Flying when Data Comm was introduced; however, the Pilot Monitoring had significantly less head-up time. Data Comm workload was rated as operationally acceptable by both crew members in all conditions in flight at any altitude above the Final Approach Fix in terms of response time and workload. Results also indicate the use of Data Comm during surface operations was acceptable, the exception being the simultaneous use of voice, Data Comm, and audio chime required for an aircraft to cross an active runway. Many crews reported they believed Data Comm messages would be acceptable after the Final Approach Fix or to cross a runway if the message was not accompanied by a chime and there was not a requirement to immediately respond to the uplink message.

  2. Concept of Operations for the Next Generation Air Transportation System, Version 2.0

    DTIC Science & Technology

    2007-06-13

    SIDA )/airport operations area (AOA), [R-110] terminal perimeter, terminal airspace (security) • Landside. Terminal public and commercial roadways and...Required Surveillance Performance RTSS Remote Terminal Security Screening SAA Special Activity Airspace SIDA Security Identification Display Area SM...impede airside operations? R-110 Research 6.4.2/C. 4.4.1 Airside: Security Identification Display Area ( SIDA )/AOA R&D needed to develop and

  3. KSC-2009-4470

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist Jose Hernandez takes his turn driving an M-113 armored personnel carrier. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  4. KSC-2009-4471

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist Jose Hernandez has completed his turn driving an M-113 armored personnel carrier. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  5. KSC-2009-4465

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist Nicole Stott has completed her turn at driving an M-113 armored personnel carrier. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  6. KSC-2009-4466

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist Patrick Forrester has completed his turn at driving an M-113 armored personnel carrier. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  7. KSC-2009-4468

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist John "Danny" Olivas has completed his turn driving an M-113 armored personnel carrier. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  8. KSC-2009-4469

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist John "Danny" Olivas takes his turn driving an M-113 armored personnel carrier. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  9. A Geosynchronous Orbit Optical Communications Relay Architecture

    NASA Technical Reports Server (NTRS)

    Edwards, Bernard L.; Israel, David J.

    2014-01-01

    NASA is planning to fly a Next Generation Tracking and Data Relay Satellite (TDRS) next decade. While the requirements and architecture for that satellite are unknown at this time, NASA is investing in communications technologies that could be deployed on the satellite to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in December 2017 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the Next Generation TDRS. While it is obvious that a small to medium sized optical communications terminal could be flown on a GEO satellite to provide support to Near Earth missions, it is also possible to deploy a large terminal on the satellite to support Deep Space missions. Onboard data processing and Delay Tolerant Networking (DTN) are two additional technologies that could be used to optimize optical communications link services and enable additional mission and network operations. This paper provides a possible architecture for the optical communications augmentation of a Next Generation TDRS and touches on the critical technology work currently being done at NASA. It will also describe the impact of clouds on such an architecture and possible mitigation techniques.

  10. A human factors methodology for real-time support applications

    NASA Technical Reports Server (NTRS)

    Murphy, E. D.; Vanbalen, P. M.; Mitchell, C. M.

    1983-01-01

    A general approach to the human factors (HF) analysis of new or existing projects at NASA/Goddard is delineated. Because the methodology evolved from HF evaluations of the Mission Planning Terminal (MPT) and the Earth Radiation Budget Satellite Mission Operations Room (ERBS MOR), it is directed specifically to the HF analysis of real-time support applications. Major topics included for discussion are the process of establishing a working relationship between the Human Factors Group (HFG) and the project, orientation of HF analysts to the project, human factors analysis and review, and coordination with major cycles of system development. Sub-topics include specific areas for analysis and appropriate HF tools. Management support functions are outlined. References provide a guide to sources of further information.

  11. A Coupled Probabilistic Wake Vortex and Aircraft Response Prediction Model

    NASA Technical Reports Server (NTRS)

    Gloudemans, Thijs; Van Lochem, Sander; Ras, Eelco; Malissa, Joel; Ahmad, Nashat N.; Lewis, Timothy A.

    2016-01-01

    Wake vortex spacing standards along with weather and runway occupancy time, restrict terminal area throughput and impose major constraints on the overall capacity and efficiency of the National Airspace System (NAS). For more than two decades, the National Aeronautics and Space Administration (NASA) has been conducting research on characterizing wake vortex behavior in order to develop fast-time wake transport and decay prediction models. It is expected that the models can be used in the systems level design of advanced air traffic management (ATM) concepts that safely increase the capacity of the NAS. It is also envisioned that at a later stage of maturity, these models could potentially be used operationally, in groundbased spacing and scheduling systems as well as on the flight deck.

  12. A Simulation Testbed for Airborne Merging and Spacing

    NASA Technical Reports Server (NTRS)

    Santos, Michel; Manikonda, Vikram; Feinberg, Art; Lohr, Gary

    2008-01-01

    The key innovation in this effort is the development of a simulation testbed for airborne merging and spacing (AM&S). We focus on concepts related to airports with Super Dense Operations where new airport runway configurations (e.g. parallel runways), sequencing, merging, and spacing are some of the concepts considered. We focus on modeling and simulating a complementary airborne and ground system for AM&S to increase efficiency and capacity of these high density terminal areas. From a ground systems perspective, a scheduling decision support tool generates arrival sequences and spacing requirements that are fed to the AM&S system operating on the flight deck. We enhanced NASA's Airspace Concept Evaluation Systems (ACES) software to model and simulate AM&S concepts and algorithms.

  13. Operation and evaluation of the terminal configured vehicle mission simulator in an automated terminal area metering and spacing ATC environment

    NASA Technical Reports Server (NTRS)

    Houck, J. A.

    1979-01-01

    The development of a mission simulator for use in the Terminal Configured Vehicle (TCV) program is outlined. The broad objectives of the TCV program are to evaluate new concepts in airborne systems and in operational flight procedures. These evaluations are directed toward improving terminal area capacity and efficiency, improving approach and landing capability in adverse weather, and reducing noise impact in the terminal area. A description is given of the design features and operating principles of the two major components of the TCV Mission Simulator: the TCV Aft Flight Deck Simulation and the Terminal Area Air Traffic Model Simulation, and their merger to form the TCV Mission Simulator. The first research study conducted in the Mission Simulator is presented along with some preliminary results.

  14. Using the NASA GRC Sectored-One-Dimensional Combustor Simulation

    NASA Technical Reports Server (NTRS)

    Paxson, Daniel E.; Mehta, Vishal R.

    2014-01-01

    The document is a user manual for the NASA GRC Sectored-One-Dimensional (S-1-D) Combustor Simulation. It consists of three sections. The first is a very brief outline of the mathematical and numerical background of the code along with a description of the non-dimensional variables on which it operates. The second section describes how to run the code and includes an explanation of the input file. The input file contains the parameters necessary to establish an operating point as well as the associated boundary conditions (i.e. how it is fed and terminated) of a geometrically configured combustor. It also describes the code output. The third section describes the configuration process and utilizes a specific example combustor to do so. Configuration consists of geometrically describing the combustor (section lengths, axial locations, and cross sectional areas) and locating the fuel injection point and flame region. Configuration requires modifying the source code and recompiling. As such, an executable utility is included with the code which will guide the requisite modifications and insure that they are done correctly.

  15. Windshear database for forward-looking systems certification

    NASA Technical Reports Server (NTRS)

    Switzer, G. F.; Proctor, F. H.; Hinton, D. A.; Aanstoos, J. V.

    1993-01-01

    This document contains a description of a comprehensive database that is to be used for certification testing of airborne forward-look windshear detection systems. The database was developed by NASA Langley Research Center, at the request of the Federal Aviation Administration (FAA), to support the industry initiative to certify and produce forward-look windshear detection equipment. The database contains high resolution, three dimensional fields for meteorological variables that may be sensed by forward-looking systems. The database is made up of seven case studies which have been generated by the Terminal Area Simulation System, a state-of-the-art numerical system for the realistic modeling of windshear phenomena. The selected cases represent a wide spectrum of windshear events. General descriptions and figures from each of the case studies are included, as well as equations for F-factor, radar-reflectivity factor, and rainfall rate. The document also describes scenarios and paths through the data sets, jointly developed by NASA and the FAA, to meet FAA certification testing objectives. Instructions for reading and verifying the data from tape are included.

  16. Trade-Off Analysis Report

    NASA Technical Reports Server (NTRS)

    Dhas, Chris

    2000-01-01

    NASAs Glenn Research Center (GRC) defines and develops advanced technology for high priority national needs in communications technologies for application to aeronautics and space. GRC tasked Computer Networks and Software Inc. (CNS) to examine protocols and architectures for an In-Space Internet Node. CNS has developed a methodology for network reference models to support NASAs four mission areas: Earth Science, Space Science, Human Exploration and Development of Space (REDS), Aerospace Technology. CNS previously developed a report which applied the methodology, to three space Internet-based communications scenarios for future missions. CNS conceptualized, designed, and developed space Internet-based communications protocols and architectures for each of the independent scenarios. GRC selected for further analysis the scenario that involved unicast communications between a Low-Earth-Orbit (LEO) International Space Station (ISS) and a ground terminal Internet node via a Tracking and Data Relay Satellite (TDRS) transfer. This report contains a tradeoff analysis on the selected scenario. The analysis examines the performance characteristics of the various protocols and architectures. The tradeoff analysis incorporates the results of a CNS developed analytical model that examined performance parameters.

  17. Status of Free-Space Optical Communications at JPL

    NASA Technical Reports Server (NTRS)

    Hemmati, H.

    2000-01-01

    Optical communications is a rapidly developing technology applicable to future NASA and commercial space missions that desire a communications terminal that provides a higher data rate with lower mass and power.

  18. OPALS Final Testing

    NASA Image and Video Library

    2014-07-24

    Optical PAyload for Lasercomm Science OPALS flight terminal undergoes final testing at NASA Jet Propulsion Laboratory. OPALS was launched to the International Space Station from Cape Canaveral Air Force Station in Florida on April 18, 2014.

  19. Low Earth Orbiter: Terminal

    NASA Technical Reports Server (NTRS)

    Kremer, Steven E.; Bundick, Steven N.

    1999-01-01

    In response to the current government budgetary environment that requires the National Aeronautics and Space Administration (NASA) to do more with less, NASA/Goddard Space Flight Center's Wallops Flight Facility has developed and implemented a class of ground stations known as a Low Earth Orbiter-Terminal (LEO-T). This development thus provides a low-cost autonomous ground tracking service for NASA's customers. More importantly, this accomplishment provides a commercial source to spacecraft customers around the world to purchase directly from the company awarded the NASA contract to build these systems. A few years ago, NASA was driven to provide more ground station capacity for spacecraft telemetry, tracking, and command (TT&C) services with a decreasing budget. NASA also made a decision to develop many smaller, cheaper satellites rather than a few large spacecraft as done in the past. In addition, university class missions were being driven to provide their own TT&C services due to the increasing load on the NASA ground-tracking network. NASA's solution for this ever increasing load was to use the existing large aperture systems to support those missions requiring that level of performance and to support the remainder of the missions with the autonomous LEO-T systems. The LEO-T antenna system is a smaller, cheaper, and fully autonomous unstaffed system that can operate without the existing NASA support infrastructure. The LEO-T provides a low-cost, reliable space communications service to the expanding number of low-earth orbiting missions around the world. The system is also fostering developments that improve cost-effectiveness of autonomous-class capabilities for NASA and commercial space use. NASA has installed three LEO-T systems. One station is at the University of Puerto Rico, the second system is installed at the Poker Flat Research Range near Fairbanks, Alaska, and the third system is installed at NASA's Wallops Flight Facility in Virginia. This paper will describe the current NASA implementation of the LEO-T network of antenna systems, the customers now being supported, and the services NASA can now offer with this new breed of autonomous ground stations. In addition, the paper will define the technical capabilities of the system and the cost effectiveness of using the systems including the capital costs of installation.

  20. 43 CFR 3137.133 - After participating areas are established, when does the unit terminate?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false After participating areas are established, when does the unit terminate? 3137.133 Section 3137.133 Public Lands: Interior Regulations Relating to... Reserve-Alaska Unit Termination § 3137.133 After participating areas are established, when does the unit...

  1. Daedalia Planum

    NASA Image and Video Library

    2012-06-13

    This image from NASA 2001 Mars Odyssey spacecraft of Daedalia Planum shows the termination or end of a single flow. In this case it is the end of the brighter/rougher flow on the right side of the image.

  2. Arcuate Fratures

    NASA Image and Video Library

    2012-10-22

    This image from NASA 2001 Mars Odyssey spacecraft of Daedalia Planum shows the termination or end of a single flow. In this case it is the end of the brighter/rougher flow on the right side of the image.

  3. Tiny by the Terminator

    NASA Image and Video Library

    2011-12-19

    A pair of Saturn moons appear insignificant compared to the immensity of the planet. Enceladus is at left, Epimetheus appears as a tiny black speck on the far left in this image from NASA Cassini spacecraft.

  4. An active K/Ka-band antenna array for the NASA ACTS mobile terminal

    NASA Technical Reports Server (NTRS)

    Tulintseff, A.; Crist, R.; Densmore, Art; Sukamto, L.

    1993-01-01

    An active K/Ka-band antenna array is currently under development for NASA's ACTS Mobile Terminal (AMT). The AMT task will demonstrate voice, data, and video communications to and from the AMT vehicle in Los Angeles, California, and a base station in Cleveland, Ohio, via the ACTS satellite at 30 and 20 GHz. Satellite tracking for the land-mobile vehicular antenna system involves 'mechanical dithering' of the antenna, where the antenna radiates a fixed beam 46 deg. above the horizon. The antenna is to transmit horizontal polarization and receive vertical polarization at 29.634 plus or minus 0.15 GHz and 19.914 plus or minus 0.15 GHz, respectively. The active array will provide a minimum of 22 dBW EIRP transmit power density and a -8 dB/K deg. receive sensitivity.

  5. KSC-08pd0508

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, STS-123 Mission Specialist Takao Doi of the Japan Aerospace Exploration Agency receives instruction on the operation of a slidewire basket during emergency egress training. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  6. KSC-08pd0502

    NASA Image and Video Library

    2008-02-23

    KENNEDY SPACE CENTER, FLA. -- In NASA Kennedy Space Center's News Room, STS-123 Mission Specialist Takao Doi, of the Japan Aerospace Exploration Agency, shows his enthusiasm for his upcoming flight during an interview. The crew for space shuttle Endeavour's STS-123 mission is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Amanda Diller

  7. Feasibility Activities Completed for the Direct Data Distribution (D(sup )3) Experiment

    NASA Technical Reports Server (NTRS)

    Wald, Lawrence W.

    2000-01-01

    The Direct Data Distribution (D(sup 3)) project being designed at the NASA Glenn Research Center at Lewis Field will demonstrate a high-performance communications system that transmits information at up to 1.2 gigabits per second (Gbps) from an advanced technology payload carried by the space shuttles in low Earth orbit to small (0.9-m) autonomously tracking terminals on the Earth. The flight communications package features a solid-state, phased-array antenna operating in the commercial K-band frequency that electronically steers two independently controlled downlink beams toward low-cost tracking ground terminals. The array enables agile, vibration-free beam steering at reduced size and weight with increased reliability over traditional mechanically steered reflectors. The flight experiment will also demonstrate efficient digital modulation technology that allows transmission of substantially increased amounts of latency-tolerant data (up to 72 Gb of data per minute of contact time) with very high quality (10(exp -11) bit error rate). D(sup 3) enables transmission from low-Earth-orbit science spacecraft, the shuttles, or the International Space Station directly to NASA field centers and principle investigator sites, or directly into the commercial terrestrial telecommunications network for remote distribution and archive. The ground terminal features a cryocooled receiver for ultralow noise and a reduced antenna aperture as well as open-loop tracking for unattended operations. The D(sup 3) technology validation and service demonstration will help to facilitate NASA's transition from using Government-owned communications assets to using commercially provided services.

  8. Status of NASA's commercial cargo and crew transportation initiative

    NASA Astrophysics Data System (ADS)

    Lindenmoyer, Alan; Stone, Dennis

    2010-03-01

    To stimulate the commercial space transportation industry, the National Aeronautics and Space Administration (NASA) is facilitating the demonstration of Commercial Orbital Transportation Services (COTS) to Low Earth Orbit (LEO) by private-sector companies. In 2006, NASA entered into funded agreements with two such companies to share NASA's 500 million investment, Space Exploration Technologies (SpaceX) and Rocketplane Kistler (RpK), each of which proposed to obtain the additional private financing needed to complete its flight demonstrations. In 2007, NASA terminated the agreement with RpK because it failed to meet a series of technical and financial milestones which were necessary to receive the incremental NASA payments. In 2008, NASA conducted another competition for the remaining 170 million of NASA funding and entered into a funded agreement with Orbital Sciences Corporation (OSC). This paper provides an overview of the COTS approach of SpaceX and OSC and the status of their efforts to develop reliable and cost-effective commercial transportation to serve the LEO marketplace.

  9. Mountains and Plateaus on Io

    NASA Technical Reports Server (NTRS)

    1997-01-01

    These two views of Io were acquired by NASA's Galileo spacecraft during its seventh orbit (G7) of Jupiter. The images were designed to view large features on Io at low sun angles when the lighting conditions emphasize the topography or relief of the volcanic satellite. Sun angles are low near the terminator which is the day-night boundary near the left side of the images. These images reveal that the topography is very flat near the active volcanic centers such as Loki Patera (the large dark horseshoe-shaped feature near the terminator in the left-hand image) and that a variety of mountains and plateaus exist elsewhere.

    North is to the top of the picture. The resolution is about 6 kilometers per picture element (6.1 for the left hand image and 5.7 for the right). The images were taken on April 4th, 1997 at a ranges of 600,000 kilometers (left image) and 563,000 kilometers (right image) by the solid state imaging (CCD) system on NASA's Galileo spacecraft.

    The Jet Propulsion Laboratory, Pasadena, CA manages the mission for NASA's Office of Space Science, Washington, DC.

    This image and other images and data received from Galileo are posted on the World Wide Web, on the Galileo mission home page at URL http://galileo.jpl.nasa.gov. Background information and educational context for the images can be found at URL http://www.jpl.nasa.gov/galileo/sepo

  10. NASA USRP Internship Final Report

    NASA Technical Reports Server (NTRS)

    Black, Jesse A.

    2010-01-01

    The purpose of this report is to describe the body of work I have produced as a NASA USRP intern in the spring 2010. My mentor during this time was Richard Birr and I assisted him with many tasks in the advanced systems group in the engineering design lab at NASA's Kennedy space center. The main priority was and scenario modeling for the FAA's next generation air traffic control system and also developing next generation range systems for implementation at Kennedy space center. Also of importance was the development of wiring diagrams for the portable communications terminal for the desert rats program.

  11. Modifications to the NASA SP-8072 Distributed Source Method II for Ares I Lift-off Environment Predictions

    NASA Technical Reports Server (NTRS)

    Haynes, Jared; Kenny, Jeremy

    2009-01-01

    Lift-off acoustic environments for NASA's Ares I - Crew Launch Vehicle are predicted using the second source distribution methodology described in the NASA SP-8072. Three modifications made to the model include a shorter core length approximation, a core termination procedure upon plume deflection, and a new set of directivity indices measured from static test firings of the Reusable Solid Rocket Motor (RSRM). The modified sound pressure level predictions increased more than 5 dB overall, and the peak levels shifted two third-octave bands higher in frequency.

  12. ATM Technology Demonstration 1 (ATD-1) Project: Terminal Airspace Technologies for NextGen (Public)

    NASA Technical Reports Server (NTRS)

    Robinson, John E.; Wang, Easter

    2015-01-01

    This video highlights the human-in-the-loop (HITL) simulations conducted by the ATD-1 project and features visual elements developed for Traffic Management Advisor - Terminal Metering, Controller Managed Spacing, and Flight Deck Interval Management. The video content is fairly technical and intended for audiences that have some knowledge of air traffic management issues. This includes researchers and management from NASA, FAA, industry partners, and others interested in terminal metering, controller managed spacing, and interval management technologies. Please note that the media release only clears the video for peer audiences such as ATM conferences or as part of presentations to researchers.

  13. KSC-2009-4472

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist Christer Fuglesang takes his turn driving an M-113 armored personnel carrier. Fuglesang represents the European Space Agency. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  14. KSC-2009-4473

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist Christer Fuglesang has completed his turn driving an M-113 armored personnel carrier. Fuglesang represents the European Space Agency. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  15. Air Traffic Management Technology Demostration Phase 1 (ATD) Interval Management for Near-Term Operations Validation of Acceptability (IM-NOVA) Experiment

    NASA Technical Reports Server (NTRS)

    Kibler, Jennifer L.; Wilson, Sara R.; Hubbs, Clay E.; Smail, James W.

    2015-01-01

    The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Airspace Systems Program's Air Traffic Management Technology Demonstration-1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using Next Generation Air Transportation System (NextGen) surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IMNOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations were acceptable to and feasible for use by flight crews in a voice communications environment when used with a minimum set of Flight Deck-based Interval Management (FIM) equipment and a prototype crew interface. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft Automatic Dependent Surveillance-Broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated into LaRC's Air Traffic Operations Laboratory (ATOL). Data were collected from 10 crews of current 757/767 pilots asked to fly a high-fidelity, fixed-based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes (ASTAR) algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into the DFW International Airport, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final, and Tower controllers. Analyses of qualitative data revealed that the procedures used by flight crews to receive and execute interval management (IM) clearances in a voice communications environment were logical, easy to follow, did not contain any missing or extraneous steps, and required the use of an acceptable workload level. The majority of the pilot participants found the IM concept, in addition to the proposed FIM crew procedures, to be acceptable and indicated that the ATD-1 procedures could be successfully executed in a nearterm NextGen environment. Analyses of quantitative data revealed that the proposed procedures were feasible for use by flight crews in a voice communications environment. The delivery accuracy at the achieve-by point was within +/-5 sec, and the delivery precision was less than 5 sec. Furthermore, FIM speed commands occurred at a rate of less than one per minute, and pilots found the frequency of the speed commands to be acceptable at all times throughout the experiment scenarios.

  16. Dust Devil Tracks

    NASA Image and Video Library

    2012-11-13

    This image from NASA 2001 Mars Odyssey spacecraft of Daedalia Planum shows the termination or end of a single flow. In this case it is the end of the brighter/rougher flow on the right side of the image.

  17. Senkyo and Vortex

    NASA Image and Video Library

    2013-01-28

    NASA Cassini spacecraft simultaneously peers through the haze in Titan equatorial region down to its surface and captures the vortex of clouds hovering over its south pole just to the right of the terminator on the moon dark side.

  18. Line of Craters

    NASA Image and Video Library

    2012-06-04

    NASA Cassini spacecraft takes a close look at a row of craters on Saturn moon Tethys during the spacecraft April 14, 2012, flyby of the moon. Three large craters are visible along the terminator between day and night on Tethys.

  19. Jets Galore

    NASA Image and Video Library

    2010-11-04

    This enhanced image, one of the closest taken of comet Harley 2 by NASA EPOXI mission, shows jets and where they originate from the surface. There are jets outgassing from the sunward side, the night side, and along the terminator.

  20. Large Circular Basin Flooded and then Cratered

    NASA Image and Video Library

    2000-08-05

    As NASA Mariner 10 passed by Mercury on its second encounter with the planet on Sept. 21, 1974, this picture of a large circular 350 kilometer, 220 mile diameter basin was obtained near the morning terminator.

  1. Malaspina Glacier, Alaska

    NASA Image and Video Library

    2002-02-26

    This image from the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) instrument on NASA's Terra satellite covers an area of 55 by 40 kilometers (34 by 25 miles) over the southwest part of the Malaspina Glacier and Icy Bay in Alaska. The composite of infrared and visible bands results in the snow and ice appearing light blue, dense vegetation is yellow-orange and green, and less vegetated, gravelly areas are in orange. According to Dr. Dennis Trabant (U.S. Geological Survey, Fairbanks, Alaska), the Malaspina Glacier is thinning. Its terminal moraine protects it from contact with the open ocean; without the moraine, or if sea level rises sufficiently to reconnect the glacier with the ocean, the glacier would start calving and retreat significantly. ASTER data are being used to help monitor the size and movement of some 15,000 tidal and piedmont glaciers in Alaska. Evidence derived from ASTER and many other satellite and ground-based measurements suggests that only a few dozen Alaskan glaciers are advancing. The overwhelming majority of them are retreating. This ASTER image was acquired on June 8, 2001. With its 14 spectral bands from the visible to the thermal infrared wavelength region, and its high spatial resolution of 15 to 90 meters (about 50 to 300 feet), ASTER will image Earth for the next six years to map and monitor the changing surface of our planet. http://photojournal.jpl.nasa.gov/catalog/PIA03475

  2. Joint NASA Ames/Langley Experimental Evaluation of Integrated Air/Ground Operations for En Route Free Maneuvering

    NASA Technical Reports Server (NTRS)

    Barhydt, Richard; Kopardekar, Parimal; Battiste, Vernol; Doble, Nathan; Johnson, Walter; Lee, Paul; Prevot, Thomas; Smith, Nancy

    2005-01-01

    In order to meet the anticipated future demand for air travel, the National Aeronautics and Space Administration (NASA) is investigating a new concept of operations known as Distributed Air-Ground Traffic Management (DAG-TM). Under the En Route Free Maneuvering component of DAG-TM, appropriately equipped autonomous aircraft self separate from other autonomous aircraft and from managed aircraft that continue to fly under today s Instrument Flight Rules (IFR). Controllers provide separation services between IFR aircraft and assign traffic flow management constraints to all aircraft. To address concept feasibility issues pertaining to integrated air/ground operations at various traffic levels, NASA Ames and Langley Research Centers conducted a joint human-in-the-loop experiment. Professional airline pilots and air traffic controllers flew a total of 16 scenarios under four conditions: mixed autonomous/managed operations at three traffic levels and a baseline all-managed condition at the lowest traffic level. These scenarios included en route flights and descents to a terminal area meter fix in airspace modeled after the Dallas Ft. Worth area. Pilots of autonomous aircraft met controller assigned meter fix constraints with high success. Separation violations by subject pilots did not appear to vary with traffic level and were mainly attributable to software errors and procedural lapses. Controller workload was lower for mixed flight conditions, even at higher traffic levels. Pilot workload was deemed acceptable under all conditions. Controllers raised several safety concerns, most of which pertained to the occurrence of near-term conflicts between autonomous and managed aircraft. These issues are being addressed through better compatibility between air and ground systems and refinements to air and ground procedures.

  3. Knowledge-Based Runway Assignment for Arrival Aircraft in the Terminal Area

    DOT National Transportation Integrated Search

    1997-01-01

    A knowledge-based system for scheduling arrival traffic in the terminal area, : referred to as the Final Approach Spacing Tool (FAST), has been implemented and : operationally tested at the Dallas/Fort Worth Terminal Radar Approach Control : (TRACON)...

  4. Hydrologic Modeling of Relatively Recent Martian Streams and Lake

    NASA Image and Video Library

    2016-09-15

    This map of an area within the Arabia Terra region on Mars shows where hydrologic modeling predicts locations of depressions that would have been lakes (black), overlaid with a map of the preserved valleys (blue lines, with width exaggerated for recognition) that would have been streams. The area today holds numerous features called "fresh shallow valleys." Research findings in 2016 interpret the fresh shallow valleys as evidence for flows of liquid water that occurred several hundred million years -- up to about a billion years -- after the ancient lakes and streams previously documented on Mars. Most of the fresh shallow valleys in this northern portion of Arabia Terra terminate at the margins of model-predicted submerged basins, consistent with an interpretation of flows into lakes and out of lakes. Some valley segments connect to form longer systems, consistent with connections forged by flowing water between interspersed lakes. In the area mapped here, for example, valleys connect basin "A" to basin "B," and basin B to "Heart Lake," each lower in elevation in that chain. http://photojournal.jpl.nasa.gov/catalog/PIA20839

  5. AWE: Aviation Weather Data Visualization Environment

    NASA Technical Reports Server (NTRS)

    Spirkovska, Lilly; Lodha, Suresh K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Weather is one of the major causes of aviation accidents. General aviation (GA) flights account for 92% of all the aviation accidents, In spite of all the official and unofficial sources of weather visualization tools available to pilots, there is an urgent need for visualizing several weather related data tailored for general aviation pilots. Our system, Aviation Weather Data Visualization Environment AWE), presents graphical displays of meteorological observations, terminal area forecasts, and winds aloft forecasts onto a cartographic grid specific to the pilot's area of interest. Decisions regarding the graphical display and design are made based on careful consideration of user needs. Integral visual display of these elements of weather reports is designed for the use of GA pilots as a weather briefing and route selection tool. AWE provides linking of the weather information to the flight's path and schedule. The pilot can interact with the system to obtain aviation-specific weather for the entire area or for his specific route to explore what-if scenarios and make "go/no-go" decisions. The system, as evaluated by some pilots at NASA Ames Research Center, was found to be useful.

  6. Workmanship Standards Personnel Training and Certification Explained

    NASA Technical Reports Server (NTRS)

    Plante, Jeannette F.

    2010-01-01

    This slide presentation reviews the standards that NASA requires for workmanship and discusses the rationale and the NASA-STD-8739.x standard series. The training and certification of inspectors and operators is to guarantee that workmanship is qualified for NASA applications. The NASA workmanship standard documents review the standards for: Polymeric Applications, Surface Mount Technology, Soldered Electrical Connections, Crimp, Cable and Harnesses, Fiber Optic Terminations, including ANSI and IPC standards for Electrostatic Discharge Safety, Space Applications Electronic Hardware and Requirements for Soldered Electrical and Electronic Assemblies. It also reviews the certification requirements for appropriate personnel. It also reviews the various levels of trainers for the various requirements. There is also a review of calibration requirements for training equipment. Some variations on the curriculum are allowed. NASA requires operators and inspectors to be certified by their employer to ensure that oversight is being performed.

  7. Airborne Management of Traffic Conflicts in Descent With Arrival Constraints

    NASA Technical Reports Server (NTRS)

    Doble, Nathan A.; Barhydt, Richard; Krishnamurthy, Karthik

    2005-01-01

    NASA is studying far-term air traffic management concepts that may increase operational efficiency through a redistribution of decisionmaking authority among airborne and ground-based elements of the air transportation system. One component of this research, En Route Free Maneuvering, allows trained pilots of equipped autonomous aircraft to assume responsibility for traffic separation. Ground-based air traffic controllers would continue to separate traffic unequipped for autonomous operations and would issue flow management constraints to all aircraft. To evaluate En Route Free Maneuvering operations, a human-in-the-loop experiment was jointly conducted by the NASA Ames and Langley Research Centers. In this experiment, test subject pilots used desktop flight simulators to resolve conflicts in cruise and descent, and to adhere to air traffic flow constraints issued by test subject controllers. Simulators at NASA Langley were equipped with a prototype Autonomous Operations Planner (AOP) flight deck toolset to assist pilots with conflict management and constraint compliance tasks. Results from the experiment are presented, focusing specifically on operations during the initial descent into the terminal area. Airborne conflict resolution performance in descent, conformance to traffic flow management constraints, and the effects of conflicting traffic on constraint conformance are all presented. Subjective data from subject pilots are also presented, showing perceived levels of workload, safety, and acceptability of autonomous arrival operations. Finally, potential AOP functionality enhancements are discussed along with suggestions to improve arrival procedures.

  8. Flight Test of a Head-Worn Display as an Equivalent-HUD for Terminal Operations

    NASA Technical Reports Server (NTRS)

    Shelton, K. J.; Arthur, J. J., III; Prinzel, L. J., III; Nicholas, S. N.; Williams, S. P.; Bailey, R. E.

    2015-01-01

    Research, development, test, and evaluation of flight deck interface technologies is being conducted by NASA to proactively identify, develop, and mature tools, methods, and technologies for improving overall aircraft safety of new and legacy vehicles operating in the Next Generation Air Transportation System (NextGen). Under NASA's Aviation Safety Program, one specific area of research is the use of small Head-Worn Displays (HWDs) as a potential equivalent display to a Head-up Display (HUD). Title 14 of the US CFR 91.175 describes a possible operational credit which can be obtained with airplane equipage of a HUD or an "equivalent"' display combined with Enhanced Vision (EV). A successful HWD implementation may provide the same safety and operational benefits as current HUD-equipped aircraft but for significantly more aircraft in which HUD installation is neither practical nor possible. A flight test was conducted to evaluate if the HWD, coupled with a head-tracker, can provide an equivalent display to a HUD. Approach and taxi testing was performed on-board NASA's experimental King Air aircraft in various visual conditions. Preliminary quantitative results indicate the HWD tested provided equivalent HUD performance, however operational issues were uncovered. The HWD showed significant potential as all of the pilots liked the increased situation awareness attributable to the HWD's unique capability of unlimited field-of-regard.

  9. The X-43A/Pegasus combination dropped into the Pacific Ocean after losing control early in the first free-flight attempt

    NASA Image and Video Library

    2001-06-02

    The first X-43A hypersonic research aircraft and its modified Pegasus booster rocket were carried aloft by NASA's NB-52B carrier aircraft from Dryden Flight Research Center at Edwards Air Force Base, Calif., on June 2, 2001 for the first of three high-speed free flight attempts. About an hour and 15 minutes later the Pegasus booster was released from the B-52 to accelerate the X-43A to its intended speed of Mach 7. Before this could be achieved, the combined Pegasus and X-43A "stack" lost control about eight seconds after ignition of the Pegasus rocket motor. The mission was terminated and explosive charges ensured the Pegasus and X-43A fell into the Pacific Ocean in a cleared Navy range area. A NASA investigation board is being assembled to determine the cause of the incident. Work continues on two other X-43A vehicles, the first of which could fly by late 2001. Central to the X-43A program is its integration of an air-breathing "scramjet" engine that could enable a variety of high-speed aerospace craft, and promote cost-effective access to space. The 12-foot, unpiloted research vehicle was developed and built for NASA by MicroCraft Inc., Tullahoma, Tenn. The booster was built by Orbital Sciences Corp. at Chandler, Ariz.

  10. Ignition of the Pegasus rocket moments after release from the B-52 signaled acceleration of the X-43A/Pegasus combination over the Pacific Ocean

    NASA Image and Video Library

    2001-06-02

    The first X-43A hypersonic research aircraft and its modified Pegasus booster rocket were carried aloft by NASA's NB-52B carrier aircraft from Dryden Flight Research Center at Edwards Air Force Base, Calif., on June 2, 2001 for the first of three high-speed free flight attempts. About an hour and 15 minutes later the Pegasus booster was released from the B-52 to accelerate the X-43A to its intended speed of Mach 7. Before this could be achieved, the combined Pegasus and X-43A "stack" lost control about eight seconds after ignition of the Pegasus rocket motor. The mission was terminated and explosive charges ensured the Pegasus and X-43A fell into the Pacific Ocean in a cleared Navy range area. A NASA investigation board is being assembled to determine the cause of the incident. Work continues on two other X-43A vehicles, the first of which could fly by late 2001. Central to the X-43A program is its integration of an air-breathing "scramjet" engine that could enable a variety of high-speed aerospace craft, and promote cost-effective access to space. The 12-foot, unpiloted research vehicle was developed and built for NASA by MicroCraft Inc., Tullahoma, Tenn. The booster was built by Orbital Sciences Corp. at Chandler, Ariz.

  11. Flight test of a head-worn display as an equivalent-HUD for terminal operations

    NASA Astrophysics Data System (ADS)

    Shelton, K. J.; Arthur, J. J.; Prinzel, L. J.; Nicholas, S. N.; Williams, S. P.; Bailey, R. E.

    2015-05-01

    Research, development, test, and evaluation of flight deck interface technologies is being conducted by NASA to proactively identify, develop, and mature tools, methods, and technologies for improving overall aircraft safety of new and legacy vehicles operating in the Next Generation Air Transportation System (NextGen). Under NASA's Aviation Safety Program, one specific area of research is the use of small Head-Worn Displays (HWDs) as a potential equivalent display to a Head-up Display (HUD). Title 14 of the US CFR 91.175 describes a possible operational credit which can be obtained with airplane equipage of a HUD or an "equivalent"' display combined with Enhanced Vision (EV). A successful HWD implementation may provide the same safety and operational benefits as current HUD-equipped aircraft but for significantly more aircraft in which HUD installation is neither practical nor possible. A flight test was conducted to evaluate if the HWD, coupled with a head-tracker, can provide an equivalent display to a HUD. Approach and taxi testing was performed on-board NASA's experimental King Air aircraft in various visual conditions. Preliminary quantitative results indicate the HWD tested provided equivalent HUD performance, however operational issues were uncovered. The HWD showed significant potential as all of the pilots liked the increased situation awareness attributable to the HWD's unique capability of unlimited field-of-regard.

  12. An Active K-Band Receive Slot Array for Mobile Satellite Communications

    NASA Technical Reports Server (NTRS)

    Tulintseff, A. N.; Lee, K. A.; Sukamto, L. M.; Chew, W.

    1994-01-01

    An active receive slot array has been developed for operation in the downlink frequency band, 19.914-20.064 GHz, of NASA's Advanced Communication Technology Satellite (ACTS) for the ACTS Mobile Terminal (AMT) project.

  13. Overview of Research Transition Products

    NASA Technical Reports Server (NTRS)

    Robinson, John

    2014-01-01

    Demonstrate increased, more consistent use of Performance- Based Navigation (PBN). Accelerate transfer of NASA scheduling and spacing technologies for inclusion in late mid-term NAS. During high-fidelity human-in-the-loop simulations of Terminal Sequencing and Spacing, air traffic controllers have significantly improved their use of PBN procedures during busy traffic periods without increased workload. Executed an aggressive, short timeframe development schedule. Developed TSS prototype based upon FAA operational systems. Conducted multiple joint FAA/NASA human-in-the-loop simulations. Performed repeated incremental deliveries of tech transfer material to non-traditional RTT stakeholders. Will continue to participate in later phases of FAA acquisition process. ATD-1 transferred Terminal Sequencing and Spacing (TSS) technologies to the FAA. TSS enables routine use of underutilized advanced avionics and PBN procedures. Potential benefits to airlines operating at initial TSS sites estimated to be $300-400M/year. FAA is planning for an initial capability in the NAS in 2018.

  14. KSC-08pd0515

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission receives instruction on the operation of a slidewire basket during emergency egress training. In the basket are Mission Specialists Takao Doi of the Japan Aerospace Exploration Agency, Garrett Reisman and Rick Linnehan. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  15. KSC-08pd0495

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, a mission specialist on space shuttle Endeavour's STS-123 mission, Takao Doi of the Japan Aerospace Exploration Agency, prepares to take questions from the media during a break from emergency egress training. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  16. Design and Development of a Baseband Processor for the Advanced Communications Technology Satellite

    NASA Technical Reports Server (NTRS)

    Lee, Kerry D.

    1996-01-01

    This paper describes the implementation of the operational baseband processor (BBP) subsystem on board the NASA Advanced Communications Technology Satellite (ACTS). The BBP supports the network consisting of the NASA ground station (NGS) low burst rate (LBR) terminals, and the T1 very small aperture terminals (VSAT's), to provide flexible, demand assigned satellite switched (SS), baseband processed frequency division modulated (FDM)/time division multiple access (TDMA) operations. This paper presents an overview of the baseband processor and includes a description of the data flow, functional block diagrams, and a discussion of the implementation of BBP. A discussion of the supporting technologies for the BBP is presented. A brief summary of BBP-level performance testing is also presented. Finally, a discussion of the implications of current technology on the BBP design, if it were to be developed today, is presented.

  17. Post-Test Inspection of Nasa's Evolutionary Xenon Thruster Long Duration Test Hardware: Ion Optics

    NASA Technical Reports Server (NTRS)

    Soulas, George C.; Shastry, Rohit

    2016-01-01

    A Long Duration Test (LDT) was initiated in June 2005 as a part of NASAs Evolutionary Xenon Thruster (NEXT) service life validation approach. Testing was voluntarily terminated in February 2014, with the thruster accumulating 51,184 hours of operation, processing 918 kg of xenon propellant, and delivering 35.5 MN-s of total impulse. This presentation will present the post-test inspection results to date for the thrusters ion optics.

  18. KSC-2009-4467

    NASA Image and Video Library

    2009-08-05

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 Mission Specialist Patrick Forrester takes his turn driving an M-113 armored personnel carrier. At left is Mission Specialist John "Danny" Olivas. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown. Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett

  19. KSC-06pd1758

    NASA Image and Video Library

    2006-08-08

    KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Daniel Burbank is ready to practice driving the M-113 armored personnel carrier. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston

  20. KSC-06pd1752

    NASA Image and Video Library

    2006-08-08

    KENNEDY SPACE CENTER, FLA. - STS-115 Pilot Christopher Ferguson is ready to practice driving the M-113 armored personnel carrier. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston

  1. Expedition 34 Crew Lands

    NASA Image and Video Library

    2013-03-16

    Cars carrying Expedition 34 Commander Kevin Ford of NASA, Russian Soyuz Commander Oleg Novitskiy and Russian Flight Engineer Evgeny Tarelkin pull up to the terminal at the Kustanay Airport a few hours after the crew landed their Soyuz TMA-06M spacecraft near the town of Arkalyk, Kazakhstan on Saturday, March 16, 2013. Ford, Novitskiy, and, Tarelkin returned from 142 days onboard the International Space Station where they served as members of the Expedition 33 and 34 crews. Photo Credit: (NASA/Bill Ingalls)

  2. KSC-06pd1744

    NASA Image and Video Library

    2006-08-07

    KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist arrives at KSC's Shuttle Landing Facility aboard a T-38 jet aircraft. The STS-115 crew has flown to NASA's Kennedy Space Center to take part in Terminal Countdown Demonstration Test activities. The TCDT is a pre-launch preparation that includes practicing emergency egress from the pad, driving an M-113 armored personnel carrier, and simulating the launch countdown. Launch of STS-115 is currently scheduled for Aug. 27. Photo credit: NASA/George Shelton

  3. New Moon

    NASA Image and Video Library

    2017-12-08

    New Moon. By the modern definition, New Moon occurs when the Moon and Sun are at the same geocentric ecliptic longitude. The part of the Moon facing us is completely in shadow then. Pictured here is the traditional New Moon, the earliest visible waxing crescent, which signals the start of a new month in many lunar and lunisolar calendars. NASA's Lunar Reconnaissance Orbiter (LRO) has been in orbit around the Moon since the summer of 2009. Its laser altimeter (LOLA) and camera (LROC) are recording the rugged, airless lunar terrain in exceptional detail, making it possible to visualize the Moon with unprecedented fidelity. This is especially evident in the long shadows cast near the terminator, or day-night line. The pummeled, craggy landscape thrown into high relief at the terminator would be impossible to recreate in the computer without global terrain maps like those from LRO. To download, learn more about this visualization, or to see what the Moon will look like at any hour in 2015, visit svs.gsfc.nasa.gov/goto?4236 NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  4. Surface Development and Test Facility (SDTF) New R&D Simulator for Airport Operations

    NASA Technical Reports Server (NTRS)

    Dorighi, Nancy S.

    1997-01-01

    A new simulator, the Surface Development and Test Facility (SDTF) is under construction at the NASA Ames Research Center in Mountain View, California. Jointly funded by the FAA (Federal Aviation Administration) and NASA, the SDTF will be a testbed for airport surface automation technologies of the future. The SDTF will be operational in the third quarter of 1998. The SDTF will combine a virtual tower with simulated ground operations to allow evaluation of new technologies for safety, effectiveness, reliability, and cost benefit. The full-scale level V tower will provide a seamless 360 degree high resolution out-the-window view, and a full complement of ATC (air traffic control) controller positions. The imaging system will be generated by two fully-configured Silicon Graphics Onyx Infinite Reality computers, and will support surface movement of up to 200 aircraft and ground vehicles. The controller positions, displays and consoles can be completely reconfigured to match the unique layout of any individual airport tower. Dedicated areas will accommodate pseudo-airport ramp controllers, pseudo-airport operators, and pseudo-pilots. Up to 33 total personnel positions will be able to participate in simultaneous operational scenarios. A realistic voice communication infrastructure will emulate the intercom and telephone communications of a real airport tower. Multi-channel audio and video recording and a sophisticated data acquisition system will support a wide variety of research and development areas, such as evaluation of automation tools for surface operations, human factors studies, integration of terminal area and airport technologies, and studies of potential airport physical and procedural modifications.

  5. Flight experiments to improve terminal area operations

    NASA Technical Reports Server (NTRS)

    Salmirs, S.; Morello, S. A.

    1978-01-01

    A brief description is given of the objectives and activities of the terminal configured vehicle (TCV) program and of some of the airborne facilities. A short analysis of some particular problems in CTOL operations in the terminal area is also presented to show how the program's technical objectives are related to the defined problems. The test aircraft was flown both manually and automatically with manual monitoring over paths including 130 deg intercepts and 2.0 km and 0.8 km finals. Some statistical data are presented from these and other flight profiles designed to address specific terminal area problems. An overview is presented of research studies receiving emphasis in the next biennium and their application to the terminal area. A description of work undertaken to study the addition of adjacent traffic information to present map displays is also given.

  6. KSC-2013-4302

    NASA Image and Video Library

    2013-12-05

    CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot in Texarkana, Texas. Each vehicle will be processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage. The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Jim Grossmann

  7. KSC-2013-4300

    NASA Image and Video Library

    2013-12-05

    CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot in Texarkana, Texas. Each vehicle will be processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage. The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Jim Grossmann

  8. KSC-2013-4301

    NASA Image and Video Library

    2013-12-05

    CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot in Texarkana, Texas. Each vehicle will be processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage. The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Jim Grossmann

  9. Integrating the Base of Aircraft Data (BADA) in CTAS Trajectory Synthesizer

    NASA Technical Reports Server (NTRS)

    Abramson, Michael; Ali, Kareem

    2012-01-01

    The Center-Terminal Radar Approach Control (TRACON) Automation System (CTAS), developed at NASA Ames Research Center for assisting controllers in the management and control of air traffic in the extended terminal area, supports the modeling of more than four hundred aircraft types. However, 90% of them are supported indirectly by mapping them to one of a relatively few aircraft types for which CTAS has detailed drag and engine thrust models. On the other hand, the Base of Aircraft Data (BADA), developed and maintained by Eurocontrol, supports more than 300 aircraft types, about one third of which are directly supported, i.e. they have validated performance data. All these data were made available for CTAS by integrating BADA version 3.8 into CTAS Trajectory Synthesizer (TS). Several validation tools were developed and used to validate the integrated code and to evaluate the accuracy of trajectory predictions generated using CTAS "native" and BADA Aircraft Performance Models (APM) comparing them with radar track data. Results of these comparisons indicate that the two models have different strengths and weaknesses. The BADA APM can improve the accuracy of CTAS predictions at least for some aircraft types, especially small aircraft, and for some flight phases, especially climb.

  10. Wake Vortex Field Measurement Program at Memphis, Tennessee: Data Guide

    NASA Technical Reports Server (NTRS)

    Campbell, S. D.; Dasey, T. J.; Freehart, R. E.; Heinrichs, R. M.; Mathews, M. P.; Perras, G. H.; Rowe, G. S.

    1997-01-01

    Eliminating or reducing current restrictions in the air traffic control system due to wake vortex considerations would yield increased capacity, decreased delays, and cost savings. Current wake vortex separation standards are widely viewed as very conservative under most conditions. However, scientific uncertainty about wake vortex behavior under different atmospheric conditions remains a barrier to development of an adaptive vortex spacing system. The objective of the wake vortex field measurement efforts during December, 1994 and August, 1995 at Memphis, TN were to record wake vortex behavior for varying atmospheric conditions and types of aircraft. This effort is part of a larger effort by the NASA Langley Research Center to develop an Aircraft Vortex Spacing System (AVOSS) as an element of the Terminal Area Productivity (TAP) program. The TAP program is being performed in concert with the FAA Terminal Air Traffic Control Automation (TATCA) program and ATC Automation. Wake vortex behavior was observed using a mobile continuous-wave (CW) coherent laser Doppler radar (lidar) developed at Lincoln Laboratory. This lidar features a number of improvements over previous systems, including the first-ever demonstration of an automatic wake vortex detection and tracking algorithm.

  11. Flight tests show potential benefits of data link as primary communication medium

    NASA Technical Reports Server (NTRS)

    Scanlon, Charles H.; Knox, Charles E.

    1991-01-01

    Message exchange for air traffic control (ATC) purposes via data link offers the potential benefits of increasing the airspace system safety and efficiency. This is accomplished by reducing communication errors and relieving the overloaded ATC radio frequencies, which hamper efficient message exchanges during peak traffic periods in many busy terminal areas. However, the many uses and advantages of data link create additional questions concerning the interface among the human-users and the cockpit and ground systems. A flight test was conducted in the NASA Langley B-737 airplane to contrast flight operations using current voice communications with the use of data link for transmitting both strategic and tactical ATC clearances during a typical commercial airline flight from takeoff to landing. Commercial airplane pilots were used as test subjects.

  12. Embedded parallel processing based ground control systems for small satellite telemetry

    NASA Technical Reports Server (NTRS)

    Forman, Michael L.; Hazra, Tushar K.; Troendly, Gregory M.; Nickum, William G.

    1994-01-01

    The use of networked terminals which utilize embedded processing techniques results in totally integrated, flexible, high speed, reliable, and scalable systems suitable for telemetry and data processing applications such as mission operations centers (MOC). Synergies of these terminals, coupled with the capability of terminal to receive incoming data, allow the viewing of any defined display by any terminal from the start of data acquisition. There is no single point of failure (other than with network input) such as exists with configurations where all input data goes through a single front end processor and then to a serial string of workstations. Missions dedicated to NASA's ozone measurements program utilize the methodologies which are discussed, and result in a multimission configuration of low cost, scalable hardware and software which can be run by one flight operations team with low risk.

  13. Performance of the NASA Beacon Receiver for the Alphasat Aldo Paraboni TDP5 Propagation Experiment

    NASA Technical Reports Server (NTRS)

    Nessel, James; Morse, Jacquelynne; Zemba, Michael; Riva, Carlo; Luini, Lorenzo

    2015-01-01

    NASA Glenn Research Center (GRC) and the Politecnico di Milano (POLIMI) have initiated a joint propagation campaign within the framework of the Alphasat propagation experiment to characterize rain attenuation, scintillation, and gaseous absorption effects of the atmosphere in the 40 gigahertz band. NASA GRC has developed and installed a K/Q-band (20/40 gigahertz) beacon receiver at the POLIMI campus in Milan, Italy, which receives the 20/40 gigahertz signals broadcast from the Alphasat Aldo Paraboni Technology Demonstration Payload (TDP) no. 5 beacon payload. The primary goal of these measurements is to develop a physical model to improve predictions of communications systems performance within the Q-band. Herein, we describe the design and preliminary performance of the NASA propagation terminal, which has been installed and operating in Milan since June 2014. The receiver is based upon a validated Fast Fourier Transform (FFT) I/Q digital design approach utilized in other operational NASA propagation terminals, but has been modified to employ power measurement via a frequency estimation technique and to coherently track and measure the amplitude of the 20/40 gigahertz beacon signals. The system consists of a 1.2-meter K-band and a 0.6-meter Q-band Cassegrain reflector employing synchronous open-loop tracking to track the inclined orbit of the Alphasat satellite. An 8 hertz sampling rate is implemented to characterize scintillation effects, with a 1-hertz measurement bandwidth dynamic range of 45 decibels. A weather station with an optical disdrometer is also installed to characterize rain drop size distribution for correlation with physical based models.

  14. Preliminary Results of the NASA Beacon Receiver for Alphasat Aldo Paraboni TDP5 Propagation Experiment

    NASA Technical Reports Server (NTRS)

    Nessel, James; Morse, Jacquelynne; Zemba, Michael; Riva, Carlo; Luini, Lorenzo

    2014-01-01

    NASA Glenn Research Center (GRC) and the Politecnico di Milano (POLIMI) have initiated a joint propagation campaign within the framework of the Alphasat propagation experiment to characterize rain attenuation, scintillation, and gaseous absorption effects of the atmosphere in the 40 GHz band. NASA GRC has developed and installed a K/Q-band (20/40 GHz) beacon receiver at the POLIMI campus in Milan, Italy, which receives the 20/40 GHz signals broadcast from the Alphasat Aldo Paraboni TDP#5 beacon payload. The primary goal of these measurements is to develop a physical model to improve predictions of communications systems performance within the Q-band. Herein, we describe the design and preliminary performance of the NASA propagation terminal, which has been installed and operating in Milan since May 2014. The receiver is based upon a validated Fast Fourier Transform (FFT) I/Q digital design approach utilized in other operational NASA propagation terminals, but has been modified to employ power measurement via a frequency estimation technique and to coherently track and measure the amplitude of the 20/40 GHz beacon signals. The system consists of a 1.2-m K-band and a 0.6-m Qband Cassegrain reflector employing synchronous open-loop tracking to track the inclined orbit of the Alphasat satellite. An 8 Hz sampling rate is implemented to characterize scintillation effects, with a 1-Hz measurement bandwidth dynamic range of 45 dB. A weather station with an optical disdrometer is also installed to characterize rain drop size distribution for correlation with physical based models.

  15. Development and evaluation of a Kalman-filter algorithm for terminal area navigation using sensors of moderate accuracy

    NASA Technical Reports Server (NTRS)

    Kanning, G.; Cicolani, L. S.; Schmidt, S. F.

    1983-01-01

    Translational state estimation in terminal area operations, using a set of commonly available position, air data, and acceleration sensors, is described. Kalman filtering is applied to obtain maximum estimation accuracy from the sensors but feasibility in real-time computations requires a variety of approximations and devices aimed at minimizing the required computation time with only negligible loss of accuracy. Accuracy behavior throughout the terminal area, its relation to sensor accuracy, its effect on trajectory tracking errors and control activity in an automatic flight control system, and its adequacy in terms of existing criteria for various terminal area operations are examined. The principal investigative tool is a simulation of the system.

  16. Cratered terrain in Terra Meridiani

    NASA Image and Video Library

    2002-05-23

    This region of Terra Meridiani, imaged by NASA Mars Odyssey, shows an old, heavily degraded channel that appears to terminate abruptly at the rim of a 10 km diameter crater, suggesting that the impact crater was created after the channel was formed.

  17. Evaluation of the Terminal Sequencing and Spacing System for Performance Based Navigation Arrivals

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Jung, Jaewoo; Swenson, Harry N.; Martin, Lynne; Lin, Melody; Nguyen, Jimmy

    2013-01-01

    NASA has developed the Terminal Sequencing and Spacing (TSS) system, a suite of advanced arrival management technologies combining timebased scheduling and controller precision spacing tools. TSS is a ground-based controller automation tool that facilitates sequencing and merging arrivals that have both current standard ATC routes and terminal Performance-Based Navigation (PBN) routes, especially during highly congested demand periods. In collaboration with the FAA and MITRE's Center for Advanced Aviation System Development (CAASD), TSS system performance was evaluated in human-in-the-loop (HITL) simulations with currently active controllers as participants. Traffic scenarios had mixed Area Navigation (RNAV) and Required Navigation Performance (RNP) equipage, where the more advanced RNP-equipped aircraft had preferential treatment with a shorter approach option. Simulation results indicate the TSS system achieved benefits by enabling PBN, while maintaining high throughput rates-10% above baseline demand levels. Flight path predictability improved, where path deviation was reduced by 2 NM on average and variance in the downwind leg length was 75% less. Arrivals flew more fuel-efficient descents for longer, spending an average of 39 seconds less in step-down level altitude segments. Self-reported controller workload was reduced, with statistically significant differences at the p less than 0.01 level. The RNP-equipped arrivals were also able to more frequently capitalize on the benefits of being "Best-Equipped, Best- Served" (BEBS), where less vectoring was needed and nearly all RNP approaches were conducted without interruption.

  18. Terminal Air Flow Planning

    NASA Technical Reports Server (NTRS)

    Denery, Dallas G.; Erzberger, Heinz; Edwards, Thomas A. (Technical Monitor)

    1998-01-01

    The Center TRACON Automation System (CTAS) will be the basis for air traffic planning and control in the terminal area. The system accepts arriving traffic within an extended terminal area and optimizes the flow based on current traffic and airport conditions. The operational use of CTAS will be presented together with results from current operations.

  19. 78 FR 24668 - Milk in the Northeast and Other Marketing Areas; Termination of Proceeding on Proposed Amendments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Parts 1000, 1001, 1005, 1006, 1007... the Northeast and Other Marketing Areas; Termination of Proceeding on Proposed Amendments to Tentative Marketing Agreements and Orders AGENCY: Agricultural Marketing Service, USDA. ACTION: Termination of...

  20. Enhanced and Synthetic Vision for Terminal Maneuvering Area NextGen Operations

    NASA Technical Reports Server (NTRS)

    Kramer, Lynda J.; Bailey, Randall E.; Ellis, Kyle K. E.; Norman, R. Michael; Williams, Steven P.; Arthur, Jarvis J., III; Shelton, Kevin J.; Prinzel, Lawrence J., III

    2011-01-01

    Synthetic Vision Systems and Enhanced Flight Vision System (SVS/EFVS) technologies have the potential to provide additional margins of safety for aircrew performance and enable operational improvements for low visibility operations in the terminal area environment with equivalent efficiency as visual operations. To meet this potential, research is needed for effective technology development and implementation of regulatory and design guidance to support introduction and use of SVS/EFVS advanced cockpit vision technologies in Next Generation Air Transportation System (NextGen) operations. A fixed-base pilot-in-the-loop simulation test was conducted at NASA Langley Research Center that evaluated the use of SVS/EFVS in NextGen low visibility ground (taxi) operations and approach/landing operations. Twelve crews flew approach and landing operations in a simulated NextGen Chicago O Hare environment. Various scenarios tested the potential for EFVS for operations in visibility as low as 1000 ft runway visibility range (RVR) and SVS to enable lower decision heights (DH) than can currently be flown today. Expanding the EFVS visual segment from DH to the runway in visibilities as low as 1000 RVR appears to be viable as touchdown performance was excellent without any workload penalties noted for the EFVS concept tested. A lower DH to 150 ft and/or possibly reduced visibility minima by virtue of SVS equipage appears to be viable when implemented on a Head-Up Display, but the landing data suggests further study for head-down implementations.

  1. Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

    NASA Technical Reports Server (NTRS)

    Shastry, Rohit; Soulas, George C.

    2016-01-01

    NASAs Evolutionary Xenon Thruster (NEXT) Long-Duration Test (LDT) is part of the comprehensive service life assessment of the NEXT thruster. The test was voluntarily terminated in April 2014 after accumulating 51,184 hours of high voltage operation, processing 918 kg of xenon, and delivering 35.5 MN-s of total impulse. This presentation covers the post-test inspection of the thruster hardware, in particular of the discharge chamber and other miscellaneous components such as propellant isolators and electrical cabling.

  2. KSC-08pd1271

    NASA Image and Video Library

    2008-05-09

    CAPE CANAVERAL, Fla. -- Two of the crewmembers for the STS-124 mission, Pilot Ken Ham and Mission Specialist Akihiko Hoshide, depart NASA's Kennedy Space Center in a T-38 training jet after a successful launch dress rehearsal called the terminal countdown demonstration test. The crew is expected to return in late May for the May 31 launch of space shuttle Discovery. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Photo credit: NASA/Kim Shiflett

  3. KSC-08pd1270

    NASA Image and Video Library

    2008-05-09

    CAPE CANAVERAL, Fla. -- The crew for the STS-124 mission departs NASA's Kennedy Space Center after a successful launch dress rehearsal called the terminal countdown demonstration test. Mission Specialist Akihiko Hoshide climbs into the T-38 training jet for he flight back to Houston. The crew is expected to return in late May for the May 31 launch of space shuttle Discovery. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Photo credit: NASA/Kim Shiflett

  4. KSC-08pd1268

    NASA Image and Video Library

    2008-05-09

    CAPE CANAVERAL, Fla. -- Two of the crewmembers for the STS-124 mission, Mission Specialists Ron Garan and Karen Nyberg, depart NASA's Kennedy Space Center in a T-38 training jet after a successful launch dress rehearsal called the terminal countdown demonstration test. The crew is expected to return in late May for the May 31 launch of space shuttle Discovery. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Photo credit: NASA/Kim Shiflett

  5. KSC-07pd2697

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Pamela Melroy (front) is ready for training on the M-113 armored personnel carrier, part of emergency egress training. The training is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  6. KSC-06pd1756

    NASA Image and Video Library

    2006-08-08

    KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Heidemarie Stefanyshyn-Piper is ready to practice driving the M-113 armored personnel carrier. Behind her is pilot Christopher Ferguson. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston

  7. Development of Predictive Models of Advanced Propulsion Concepts for Low Cost Space Transportation

    NASA Technical Reports Server (NTRS)

    Morrell, Michael Randy

    2002-01-01

    This final report presents the Graduate Student Research Program (GSRP) work Mr. Morrell was able to complete as a summer intern at NASA MSFS during the summer of 2001, and represents work completed from inception through project termination. The topics include: 1) NASA TD40 Organization; 2) Combustion Physics Lab; 3) Advanced Hydrocarbon Fuels; 4) GSRP Summer Tasks; 5) High Pressure Facility Installation; 6) High Pressure Combustion Issues; 7) High Energy Density Matter (HEDM) Hydrocarbons; and 8) GSRP Summer Intern Summary.

  8. KSC-07pd2722

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Stephanie Wilson has her helmet adjusted during fitting of her launch and entry suit. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  9. KSC-07pd2717

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Doug Wheelock has his helmet fitted on his launch and entry suit, preparing for launch. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  10. KSC-07pd2719

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Daniel Tani tries on his helmet with his launch and entry suit, preparing for launch. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  11. KSC-07pd2715

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Doug Wheelock tries on his launch and entry suit to prepare for launch. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  12. KSC-07pd2718

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Paolo Nespoli has his helmet fitted on his launch and entry suit, preparing for launch. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  13. KSC-07pd2720

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Daniel Tani has his helmet adjusted during fitting of his launch and entry suit. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  14. KSC-07pd2721

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Stephanie Wilson tries on her launch and entry suit, preparing for launch. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  15. KSC-06pd1745

    NASA Image and Video Library

    2006-08-07

    KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett introduces his crew to waiting media at KSC's Shuttle Landing Facility after their arrival from Houston. The STS-115 crew has flown to NASA's Kennedy Space Center to take part in Terminal Countdown Demonstration Test activities. The TCDT is a pre-launch preparation that includes practicing emergency egress from the pad, driving an M-113 armored personnel carrier, and simulating the launch countdown. Launch of STS-115 is currently scheduled for Aug. 27. Photo credit: NASA/George Shelton

  16. SCAILET - An intelligent assistant for satellite ground terminal operations

    NASA Technical Reports Server (NTRS)

    Shahidi, A. K.; Crapo, J. A.; Schlegelmilch, R. F.; Reinhart, R. C.; Petrik, E. J.; Walters, J. L.; Jones, R. E.

    1992-01-01

    Space communication artificial intelligence for the link evaluation terminal (SCAILET) is an experimenter interface to the link evaluation terminal (LET) developed by NASA through the application of artificial intelligence to an advanced ground terminal. The high-burst-rate (HBR) LET provides the required capabilities for wideband communications experiments with the advanced communications technology satellite (ACTS). The HBR-LET terminal consists of seven major subsystems and is controlled and monitored by a minicomputer through an IEEE-488 or RS-232 interface. Programming scripts configure HBR-LET and allow data acquisition but are difficult to use and therefore the full capabilities of the system are not utilized. An intelligent assistant module was developed as part of the SCAILET module and solves problems encountered during configuration of the HBR-LET system. This assistant is a graphical interface with an expert system running in the background and allows users to configure instrumentation, program sequences and reference documentation. The simplicity of use makes SCAILET a superior interface to the ASCII terminal and continuous monitoring allows nearly flawless configuration and execution of HBR-LET experiments.

  17. Optimal Trajectories and Control Strategies for the Helicopter in One-Engine-Inoperative Terminal-Area Operations

    NASA Technical Reports Server (NTRS)

    Chen, Robert T. N.; Zhao, Yi-Yuan; Aiken, Edwin W. (Technical Monitor)

    1995-01-01

    Engine failure represents a major safety concern to helicopter operations, especially in the critical flight phases of takeoff and landing from/to small, confined areas. As a result, the JAA and FAA both certificate a transport helicopter as either Category-A or Category-B according to the ability to continue its operations following engine failures. A Category-B helicopter must be able to land safely in the event of one or all engine failures. There is no requirement, however, for continued flight capability. In contrast, Category-A certification, which applies to multi-engine transport helicopters with independent engine systems, requires that they continue the flight with one engine inoperative (OEI). These stringent requirements, while permitting its operations from rooftops and oil rigs and flight to areas where no emergency landing sites are available, restrict the payload of a Category-A transport helicopter to a value safe for continued flight as well as for landing with one engine inoperative. The current certification process involves extensive flight tests, which are potentially dangerous, costly, and time consuming. These tests require the pilot to simulate engine failures at increasingly critical conditions, Flight manuals based on these tests tend to provide very conservative recommendations with regard to maximum takeoff weight or required runway length. There are very few theoretical studies on this subject to identify the fundamental parameters and tradeoff factors involved. Furthermore, a capability for real-time generation of OEI optimal trajectories is very desirable for providing timely cockpit display guidance to assist the pilot in reducing his workload and to increase safety in a consistent and reliable manner. A joint research program involving NASA Ames Research Center, the FAA, and the University of Minnesota is being conducted to determine OEI optimal control strategies and the associated optimal,trajectories for continued takeoff (CTO), rejected takeoff (RTO), balked landing (BL), and continued landing (CL) for a twin engine helicopter in both VTOL and STOL terminal-area operations. This proposed paper will present the problem formulation, the optimal control solution methods, and the key results of the trajectory optimization studies for both STOL and VTOL OEI operations. In addition, new results concerning the recently developed methodology, which enable a real-time generation of optimal OEI trajectories, will be presented in the paper. This new real-time capability was developed to support the second piloted simulator investigation on cockpit displays for Category-A operations being scheduled for the NASA Ames Vertical Motion Simulator in June-August of 1995. The first VMS simulation was conducted in 1994 and reported.

  18. 14 CFR 93.177 - Operations in the Special Air Traffic Rule Area.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Area. 93.177 Section 93.177 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... in the Vicinity of Luke AFB, AZ § 93.177 Operations in the Special Air Traffic Rule Area. (a) Unless... Luke Terminal Area designated in § 93.176 unless— (1) Before operating within the Luke Terminal area...

  19. NASA's Laboratory Astrophysics Workshop: Opening Remarks

    NASA Technical Reports Server (NTRS)

    Hasan, Hashima

    2002-01-01

    The Astronomy and Physics Division at NASA Headquarters has an active and vibrant program in Laboratory Astrophysics. The objective of the program is to provide the spectroscopic data required by observers to analyze data from NASA space astronomy missions. The program also supports theoretical investigations to provide those spectroscopic parameters that cannot be obtained in the laboratory; simulate space environment to understand formation of certain molecules, dust grains and ices; and production of critically compiled databases of spectroscopic parameters. NASA annually solicits proposals, and utilizes the peer review process to select meritorious investigations for funding. As the mission of NASA evolves, new missions are launched, and old ones are terminated, the Laboratory Astrophysics program needs to evolve accordingly. Consequently, it is advantageous for NASA and the astronomical community to periodically conduct a dialog to assess the status of the program. This Workshop provides a forum for producers and users of laboratory data to get together and understand each others needs and limitations. A multi-wavelength approach enables a cross fertilization of ideas across wavelength bands.

  20. 9 CFR 3.41 - Handling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Welfare regulations and who moves live guinea pigs or hamsters from an animal holding area of a terminal... person subject to the Animal Welfare Act and holding any live guinea pig or hamster in an animal holding area of a terminal facility or transporting any live guinea pig or hamster to or from a terminal...

  1. The terminal crest: morphological features relevant to electrophysiology

    PubMed Central

    Sánchez-Quintana, D; Anderson, R H; Cabrera, J A; Climent, V; Martin, R; Farré, J; Ho, S Y

    2002-01-01

    Objective: To investigate the detailed anatomy of the terminal crest (crista terminalis) and its junctional regions with the pectinate muscles and intercaval area to provide the yardstick for structural normality. Design: 97 human necropsy hearts were studied from patients who were not known to have medical histories of atrial arrhythmias. The dimensions of the terminal crest were measured in width and thickness from epicardium to endocardium, at the four points known to be chosen as sites of ablation. Results: The pectinate muscles originating from the crest and extending along the wall of the appendage towards the vestibule of the tricuspid valve had a non-uniform trabecular pattern in 80% of hearts. Fine structure of the terminal crest studied using light and scanning electron microscopy consisted of much thicker and more numerous fibrous sheaths of endomysium with increasing age of the patient. 36 specimens of 45 (80%) specimens studied by electron microscopy had a predominantly uniform longitudinal arrangement of myocardial fibres within the terminal crest. In contrast, in all specimens, the junctional areas of the terminal crest with the pectinate muscles and with the intercaval area had crossing and non-uniform architecture of myofibres. Conclusions: The normal anatomy of the muscle fibres and connective tissue in the junctional area of the terminal crest/pectinate muscles and terminal crest/intercaval bundle favours non-uniform anisotropic properties. PMID:12231604

  2. 75 FR 20523 - Regulated Navigation Areas; Port of Portland Terminal 4, Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... contaminated sediment and shoreline soil in these areas. As such, the RNAs are necessary to help ensure the... Areas (RNA) at the Port of Portland Terminal 4 on the Willamette River in [[Page 20524

  3. Development of a multi-media crew-training program for the Terminal Configured Vehicle Mission Simulator

    NASA Technical Reports Server (NTRS)

    Houck, J. A.; Markos, A. T.

    1980-01-01

    This paper describes the work being done at the National Aeronautics and Space Administration's (NASA) Langley Research Center on the development of a multi-media crew-training program for the Terminal Configured Vehicle (TCV) Mission Simulator. Brief descriptions of the goals and objectives of the TCV Program and of the TCV Mission Simulator are presented. A detailed description of the training program is provided along with a description of the performance of the first group of four commercial pilots to be qualified in the TCV Mission Simulator.

  4. Development of a multi-media crew-training program for the terminal configured vehicle mission simulator

    NASA Technical Reports Server (NTRS)

    Rhouck, J. A.; Markos, A. T.

    1980-01-01

    This paper describes the work being done at the National Aeronautics and Space Administration's (NASA) Langley Research Center on the development of a multi-media crew-training program for the Terminal Configured Vehicle (TCV) Mission Simulator. Brief descriptions of the goals and objectives of the TCV Program and of the TCV Mission Simulator are presented. A detailed description of the training program is provided along with a description of the performance of the first group of four commercial pilots to be qualified in the TCV Mission Simulator.

  5. Mars Laser Communication Demonstration, Artist's Concept

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This illustration depicts a concept for operation of an optical communications system on NASA's Mars Telecommunications Orbiter. The orbiter is in development for launch in September 2009 with a payload including the spacecraft terminal of the Mars Laser Communication Demonstration Project. This project will also include an Earth-based terminal for two-way, high-data-rate communication using infrared light. The orbiter's primary communications with Earth will use radio frequencies. The laser demonstration is intended to build experience for use in decisions about possible use of optical communications by later missions.

  6. ASTER Images San Francisco Bay Area

    NASA Image and Video Library

    2000-04-26

    This image of the San Francisco Bay region was acquired on March 3, 2000 by the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) on NASA's Terra satellite. With its 14 spectral bands from the visible to the thermal infrared wavelength region, and its high spatial resolution of 15 to 90 meters about 50 to 300 feet ), ASTER will image Earth for the next 6 years to map and monitor the changing surface of our planet. Image: This image covers an area 60 kilometers (37 miles) wide and 75 kilometers (47 miles) long in three bands of the reflected visible and infrared wavelength region. The combination of bands portrays vegetation in red, and urban areas in gray. Sediment in the Suisun Bay, San Pablo Bay, San Francisco Bay, and the Pacific Ocean shows up as lighter shades of blue. Along the west coast of the San Francisco Peninsula, strong surf can be seen as a white fringe along the shoreline. A powerful rip tide is visible extending westward from Daly City into the Pacific Ocean. In the lower right corner, the wetlands of the South San Francisco Bay National Wildlife Refuge appear as large dark blue and brown polygons. The high spatial resolution of ASTER allows fine detail to be observed in the scene. The main bridges of the area (San Mateo, San Francisco-Oakland Bay, Golden Gate, Richmond-San Rafael, Benicia-Martinez, and Carquinez) are easily picked out, connecting the different communities in the Bay area. Shadows of the towers along the Bay Bridge can be seen over the adjacent bay water. With enlargement the entire road network can be easily mapped; individual buildings are visible, including the shadows of the high-rises in downtown San Francisco. Inset: This enlargement of the San Francisco Airport highlights the high spatial resolution of ASTER. With further enlargement and careful examination, airplanes can be seen at the terminals. http://photojournal.jpl.nasa.gov/catalog/PIA02606

  7. KSC-2009-5560

    NASA Image and Video Library

    2009-10-19

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-129 Commander Charles O. Hobaugh prepares to drive an M113 armored personnel carrier. The M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed. The crew members of space shuttle Atlantis' STS-129 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. Launch of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 16. For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett

  8. KSC-2009-5557

    NASA Image and Video Library

    2009-10-19

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Mike Foreman prepares to practice driving an M113 armored personnel carrier. The M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed. The crew members of space shuttle Atlantis' STS-129 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test. Launch of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 16. For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett

  9. Experiment In Aeronautical-Mobile/Satellite Communication

    NASA Technical Reports Server (NTRS)

    Jedrey, Thomas C.; Lay, Norman E.; Dessouky, Khaled

    1992-01-01

    Report describes study of performance of digital mobile/satellite communication terminals of advanced design intended for use in ground stations and airplanes in aeronautical-mobile service. Study was collaboration of NASA, Federal Aviation Administration (FAA), Communications Satellite Corp. (COMSAT), and International Maritime Satellite System (INMARSAT).

  10. NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Wong, Wayne A.

    2015-01-01

    A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

  11. Simulating Virtual Terminal Area Weather Data Bases for Use in the Wake Vortex Avoidance System (Wake VAS) Prediction Algorithm

    NASA Technical Reports Server (NTRS)

    Kaplan, Michael L.; Lin, Yuh-Lang

    2004-01-01

    During the research project, sounding datasets were generated for the region surrounding 9 major airports, including Dallas, TX, Boston, MA, New York, NY, Chicago, IL, St. Louis, MO, Atlanta, GA, Miami, FL, San Francico, CA, and Los Angeles, CA. The numerical simulation of winter and summer environments during which no instrument flight rule impact was occurring at these 9 terminals was performed using the most contemporary version of the Terminal Area PBL Prediction System (TAPPS) model nested from 36 km to 6 km to 1 km horizontal resolution and very detailed vertical resolution in the planetary boundary layer. The soundings from the 1 km model were archived at 30 minute time intervals for a 24 hour period and the vertical dependent variables as well as derived quantities, i.e., 3-dimensional wind components, temperatures, pressures, mixing ratios, turbulence kinetic energy and eddy dissipation rates were then interpolated to 5 m vertical resolution up to 1000 m elevation above ground level. After partial validation against field experiment datasets for Dallas as well as larger scale and much coarser resolution observations at the other 8 airports, these sounding datasets were sent to NASA for use in the Virtual Air Space and Modeling program. The application of these datasets being to determine representative airport weather environments to diagnose the response of simulated wake vortices to realistic atmospheric environments. These virtual datasets are based on large scale observed atmospheric initial conditions that are dynamically interpolated in space and time. The 1 km nested-grid simulated datasets providing a very coarse and highly smoothed representation of airport environment meteorological conditions. Details concerning the airport surface forcing are virtually absent from these simulated datasets although the observed background atmospheric processes have been compared to the simulated fields and the fields were found to accurately replicate the flows surrounding the airport where coarse verification data were available as well as where airport scale datasets were available.

  12. Flight demonstration of flight termination system and solid rocket motor ignition using semiconductor laser initiated ordnance

    NASA Astrophysics Data System (ADS)

    Schulze, Norman R.; Maxfield, B.; Boucher, C.

    1995-01-01

    Solid State Laser Initiated Ordnance (LIO) offers new technology having potential for enhanced safety, reduced costs, and improved operational efficiency. Concerns over the absence of programmatic applications of the technology, which has prevented acceptance by flight programs, should be abated since LIO has now been operationally implemented by the Laser Initiated Ordnance Sounding Rocket Demonstration (LOSRD) Program. The first launch of solid state laser diode LIO at the NASA Wallops Flight Facility (WFF) occurred on March 15, 1995 with all mission objectives accomplished. This project, Phase 3 of a series of three NASA Headquarters LIO demonstration initiatives, accomplished its objective by the flight of a dedicated, all-LIO sounding rocket mission using a two-stage Nike-Orion launch vehicle. LIO flight hardware, made by The Ensign-Bickford Company under NASA's first Cooperative Agreement with Profit Making Organizations, safely initiated three demanding pyrotechnic sequence events, namely, solid rocket motor ignition from the ground and in flight, and flight termination, i.e., as a Flight Termination System (FTS). A flight LIO system was designed, built, tested, and flown to support the objectives of quickly and inexpensively putting LIO through ground and flight operational paces. The hardware was fully qualified for this mission, including component testing as well as a full-scale system test. The launch accomplished all mission objectives in less than 11 months from proposal receipt. This paper concentrates on accomplishments of the ordnance aspects of the program and on the program's implementation and results. While this program does not generically qualify LIO for all applications, it demonstrated the safety, technical, and operational feasibility of those two most demanding applications, using an all solid state safe and arm system in critical flight applications.

  13. Hole-assisted fiber based fiber fuse terminator supporting 22 W input

    NASA Astrophysics Data System (ADS)

    Tsujikawa, Kyozo; Kurokawa, Kenji; Hanzawa, Nobutomo; Nozoe, Saki; Matsui, Takashi; Nakajima, Kazuhide

    2018-05-01

    We investigated the air hole structure in hole-assisted fiber (HAF) with the aim of terminating fiber fuse propagation. We focused on two structural parameters c/MFD and S1/S2, which are related respectively to the position and area of the air holes, and mapped their appropriate values for terminating fiber fuse propagation. Here, MFD is the mode field diameter, c is the diameter of an inscribed circle linking the air holes, S1 is the total area of the air holes, and S2 is the area of a circumscribed circle linking the air holes. On the basis of these results, we successfully realized a compact fiber fuse terminator consisting of a 1.35 mm-long HAF, which can terminate fiber fuse propagation even with a 22 W input. In addition, we observed fiber fuse termination using a high-speed camera. We additionally confirmed that the HAF-based fiber fuse terminator is effective under various input power conditions. The penetration length of the optical discharge in the HAF was only less than 300 μm when the input power was from 2 to 22 W.

  14. Seeing Equinoxes and Solstices from Space [hd animation

    NASA Image and Video Library

    2014-03-19

    Images acquired December 21, 2010 - September 20, 2011. To download the high res and learn more go to: earthobservatory.nasa.gov/IOTD/view.php?id=52248 One of the most frequently misunderstood concepts in science is the reason for Earth’s seasons. As we experience the September equinox today—anyone try to balance an egg yet?—we thought we’d offer a space-based view of what’s going on. Around 6 a.m. local time each day, the Sun, Earth, and any geosynchronous satellite form a right angle, affording a nadir (straight down) view of the terminator, where the shadows of nightfall meet the sunlight of dusk and dawn. The shape of this line between night and day varies with the seasons, which means different lengths of days and differing amounts of warming sunshine. (The line is actually a curve because the Earth is round, but satellite images only show it in two-dimensions.) The Spinning Enhanced Visible and Infrared Imager (SEVIRI) on EUMETSAT's Meteosat-9 captured these four views of the day-night terminator on December 21, 2010, and March 20, June 21, and September 20, 2011. Each image was taken at 6:12 a.m. local time. On March 20 and September 20, the terminator is a straight north-south line, and the Sun is said to sit directly above the equator. On December 21, the Sun resides directly over the Tropic of Capricorn when viewed from the ground, and sunlight spreads over more of the Southern Hemisphere. On June 21, the Sun sits above the Tropic of Cancer, spreading more sunlight in the north and turning the tables on the south. The bulge of our spherical Earth blocks sunlight from the far hemisphere at the solstices; that same curvature allows the Sun’s rays to spread over more area near the top and bottom of the globe. Of course, it is not the Sun that is moving north or south through the seasons, but a change in the orientation and angles between the Earth and its nearest star. The axis of the Earth is tilted 23.5 degrees relative to the Sun and the ecliptic plane. The axis is tilted away from the Sun at the December solstice and toward the Sun at the June solstice, spreading more and less light on each hemisphere. At the equinoxes, the tilt is at a right angle to the Sun and the light is spread evenly. The equinox and changing of the seasons occurs on September 23, 2011 at 9:05 a.m. Universal Time. (Our September image above is a few days early.) Equinox means "equal night" in Latin, capturing the idea that daytime and nighttime are equal lengths everywhere on the planet. That is true of the Sun's presence above the horizon, though it does not account for twilight, when the Sun's rays extend from beyond the horizon to illuminate our gas-filled atmosphere. NASA images and animation by Robert Simmon, using data ©2010 EUMETSAT. Caption by Mike Carlowicz. Instrument: Meteosat Credit: NASA Earth Observatory NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  15. Seeing Equinoxes and Solstices from Space

    NASA Image and Video Library

    2014-03-19

    Images acquired December 21, 2010 - September 20, 2011. To view a HD animation of this go to: www.flickr.com/photos/gsfc/6175313242/in/photostream/ To download the high res and learn more go to: earthobservatory.nasa.gov/IOTD/view.php?id=52248 One of the most frequently misunderstood concepts in science is the reason for Earth’s seasons. As we experience the September equinox today—anyone try to balance an egg yet?—we thought we’d offer a space-based view of what’s going on. Around 6 a.m. local time each day, the Sun, Earth, and any geosynchronous satellite form a right angle, affording a nadir (straight down) view of the terminator, where the shadows of nightfall meet the sunlight of dusk and dawn. The shape of this line between night and day varies with the seasons, which means different lengths of days and differing amounts of warming sunshine. (The line is actually a curve because the Earth is round, but satellite images only show it in two-dimensions.) The Spinning Enhanced Visible and Infrared Imager (SEVIRI) on EUMETSAT's Meteosat-9 captured these four views of the day-night terminator on December 21, 2010, and March 20, June 21, and September 20, 2011. Each image was taken at 6:12 a.m. local time. On March 20 and September 20, the terminator is a straight north-south line, and the Sun is said to sit directly above the equator. On December 21, the Sun resides directly over the Tropic of Capricorn when viewed from the ground, and sunlight spreads over more of the Southern Hemisphere. On June 21, the Sun sits above the Tropic of Cancer, spreading more sunlight in the north and turning the tables on the south. The bulge of our spherical Earth blocks sunlight from the far hemisphere at the solstices; that same curvature allows the Sun’s rays to spread over more area near the top and bottom of the globe. Of course, it is not the Sun that is moving north or south through the seasons, but a change in the orientation and angles between the Earth and its nearest star. The axis of the Earth is tilted 23.5 degrees relative to the Sun and the ecliptic plane. The axis is tilted away from the Sun at the December solstice and toward the Sun at the June solstice, spreading more and less light on each hemisphere. At the equinoxes, the tilt is at a right angle to the Sun and the light is spread evenly. The equinox and changing of the seasons occurs on September 23, 2011 at 9:05 a.m. Universal Time. (Our September image above is a few days early.) Equinox means "equal night" in Latin, capturing the idea that daytime and nighttime are equal lengths everywhere on the planet. That is true of the Sun's presence above the horizon, though it does not account for twilight, when the Sun's rays extend from beyond the horizon to illuminate our gas-filled atmosphere. NASA images and animation by Robert Simmon, using data ©2010 EUMETSAT. Caption by Mike Carlowicz. Instrument: Meteosat Credit: NASA Earth Observatory NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  16. Flight evaluation of configuration management system concepts during transition to the landing approach for a powered-lift STOL aircraft

    NASA Technical Reports Server (NTRS)

    Franklin, J. A.; Innis, R. C.

    1980-01-01

    Flight experiments were conducted to evaluate two control concepts for configuration management during the transition to landing approach for a powered-lift STOL aircraft. NASA Ames' augmentor wing research aircraft was used in the program. Transitions from nominal level-flight configurations at terminal area pattern speeds were conducted along straight and curved descending flightpaths. Stabilization and command augmentation for attitude and airspeed control were used in conjunction with a three-cue flight director that presented commands for pitch, roll, and throttle controls. A prototype microwave system provided landing guidance. Results of these flight experiments indicate that these configuration management concepts permit the successful performance of transitions and approaches along curved paths by powered-lift STOL aircraft. Flight director guidance was essential to accomplish the task.

  17. A Comparison of Center/TRACON Automation System and Airline Time of Arrival Predictions

    NASA Technical Reports Server (NTRS)

    Heere, Karen R.; Zelenka, Richard E.

    2000-01-01

    Benefits from information sharing between an air traffic service provider and a major air carrier are evaluated. Aircraft arrival time schedules generated by the NASA/FAA Center/TRACON Automation System (CTAS) were provided to the American Airlines System Operations Control Center in Fort Worth, Texas, during a field trial of a specialized CTAS display. A statistical analysis indicates that the CTAS schedules, based on aircraft trajectories predicted from real-time radar and weather data, are substantially more accurate than the traditional airline arrival time estimates, constructed from flight plans and en route crew updates. The improvement offered by CTAS is especially advantageous during periods of heavy traffic and substantial terminal area delay, allowing the airline to avoid large predictive errors with serious impact on the efficiency and profitability of flight operations.

  18. Preliminary Findings of Inflight Icing Field Test to Support Icing Remote Sensing Technology Assessment

    NASA Technical Reports Server (NTRS)

    King, Michael; Reehorst, Andrew; Serke, Dave

    2015-01-01

    NASA and the National Center for Atmospheric Research have developed an icing remote sensing technology that has demonstrated skill at detecting and classifying icing hazards in a vertical column above an instrumented ground station. This technology has recently been extended to provide volumetric coverage surrounding an airport. Building on the existing vertical pointing system, the new method for providing volumetric coverage will utilize a vertical pointing cloud radar, a multifrequency microwave radiometer with azimuth and elevation pointing, and a NEXRAD radar. The new terminal area icing remote sensing system processes the data streams from these instruments to derive temperature, liquid water content, and cloud droplet size for each examined point in space. These data are then combined to ultimately provide icing hazard classification along defined approach paths into an airport.

  19. 14 CFR 1203a.103 - Access to security areas.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Access to security areas. 1203a.103 Section 1203a.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA SECURITY AREAS § 1203a.103 Access to security areas. (a) Only those NASA employees, NASA contractor employees, and...

  20. 14 CFR 1203a.103 - Access to security areas.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Access to security areas. 1203a.103 Section 1203a.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA SECURITY AREAS § 1203a.103 Access to security areas. (a) Only those NASA employees, NASA contractor employees, and...

  1. Incorporation of New Convective Ice Microphysics into the NASA GISS GCM and Impacts on Cloud Ice Water Path (IWP) Simulation

    NASA Technical Reports Server (NTRS)

    Elsaesser, Greg; Del Genio, Anthony

    2015-01-01

    The CMIP5 configurations of the GISS Model-E2 GCM simulated a mid- and high latitude ice IWP that decreased by 50 relative to that simulated for CMIP3 (Jiang et al. 2012; JGR). Tropical IWP increased by 15 in CMIP5. While the tropical IWP was still within the published upper-bounds of IWP uncertainty derived using NASA A-Train satellite observations, it was found that the upper troposphere (200 mb) ice water content (IWC) exceeded the published upper-bound by a factor of 2. This was largely driven by IWC in deep-convecting regions of the tropics.Recent advances in the model-E2 convective parameterization have been found to have a substantial impact on tropical IWC. These advances include the development of both a cold pool parameterization (Del Genio et al. 2015) and new convective ice parameterization. In this presentation, we focus on the new parameterization of convective cloud ice that was developed using data from the NASA TC4 Mission. Ice particle terminal velocity formulations now include information from a number of NASA field campaigns. The new parameterization predicts both an ice water mass weighted-average particle diameter and a particle cross sectional area weighted-average size diameter as a function of temperature and ice water content. By assuming a gamma-distribution functional form for the particle size distribution, these two diameter estimates are all that are needed to explicitly predict the distribution of ice particles as a function of particle diameter.GCM simulations with the improved convective parameterization yield a 50 decrease in upper tropospheric IWC, bringing the tropical and global mean IWP climatologies into even closer agreement with the A-Train satellite observation best estimates.

  2. Incorporation of New Convective Ice Microphysics into the NASA GISS GCM and Impacts on Cloud Ice Water Path (IWP) Simulation

    NASA Astrophysics Data System (ADS)

    Elsaesser, G.; Del Genio, A. D.

    2015-12-01

    The CMIP5 configurations of the GISS Model-E2 GCM simulated a mid- and high-latitude ice IWP that decreased by ~50% relative to that simulated for CMIP3 (Jiang et al. 2012; JGR). Tropical IWP increased by ~15% in CMIP5. While the tropical IWP was still within the published upper-bounds of IWP uncertainty derived using NASA A-Train satellite observations, it was found that the upper troposphere (~200 mb) ice water content (IWC) exceeded the published upper-bound by a factor of ~2. This was largely driven by IWC in deep-convecting regions of the tropics. Recent advances in the model-E2 convective parameterization have been found to have a substantial impact on tropical IWC. These advances include the development of both a cold pool parameterization (Del Genio et al. 2015) and new convective ice parameterization. In this presentation, we focus on the new parameterization of convective cloud ice that was developed using data from the NASA TC4 Mission. Ice particle terminal velocity formulations now include information from a number of NASA field campaigns. The new parameterization predicts both an ice water mass weighted-average particle diameter and a particle cross sectional area weighted-average size diameter as a function of temperature and ice water content. By assuming a gamma-distribution functional form for the particle size distribution, these two diameter estimates are all that are needed to explicitly predict the distribution of ice particles as a function of particle diameter. GCM simulations with the improved convective parameterization yield a ~50% decrease in upper tropospheric IWC, bringing the tropical and global mean IWP climatologies into even closer agreement with the A-Train satellite observation best estimates.

  3. Flight experiments to improve terminal area operations

    NASA Technical Reports Server (NTRS)

    Salmirs, S.; Morello, S. A.

    1978-01-01

    A brief description is given of the objectives and activities of the terminal configured vehicle (TCV) program and of some of the airborne facilities. A short analysis of some particular problems of CTOL operations in the terminal area is also presented to show how the program's technical objectives are related to the defined problems. The test aircraft was flown both manually and automatically with manual monitoring over paths including 130 deg intercepts and 2.0 km (1.1. n. mi.) and 0.8 km (0.44 n. mi.) finals. Some statistical data are presented from these and other flight profiles designed to address specific terminal in the next biennium and their application to the terminal area. A description of work being undertaken to study the addition of adjacent traffic information to present map displays is also given.

  4. 9 CFR 3.40 - Terminal facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Welfare regulations shall commingle shipments of live guinea pigs or hamsters with inanimate cargo. All animal holding areas of a terminal facility where shipments of live guinea pigs or hamsters are... established and maintained for all animal holding areas. Any animal holding area containing live guinea pigs...

  5. Fostering Visions for the Future: A Review of the NASA Institute for Advanced Concepts

    NASA Technical Reports Server (NTRS)

    2009-01-01

    The NASA Institute for Advanced Concepts (NIAC) was formed in 1998 to provide an independent source of advanced aeronautical and space concepts that could dramatically impact how NASA develops and conducts its missions. Until the program's termination in August 2007, NIAC provided an independent open forum, a high-level point of entry to NASA for an external community of innovators, and an external capability for analysis and definition of advanced aeronautics and space concepts to complement the advanced concept activities conducted within NASA. Throughout its 9-year existence, NIAC inspired an atmosphere for innovation that stretched the imagination and encouraged creativity. As requested by Congress, this volume reviews the effectiveness of NIAC and makes recommendations concerning the importance of such a program to NASA and to the nation as a whole, including the proper role of NASA and the federal government in fostering scientific innovation and creativity and in developing advanced concepts for future systems. Key findings and recommendations include that in order to achieve its mission, NASA must have, and is currently lacking, a mechanism to investigate visionary, far-reaching advanced concepts. Therefore, a NIAC-like entity should be reestablished to fill this gap.

  6. K/Ka-band Antenna for Broadband Aeronautical Mobile Application

    NASA Technical Reports Server (NTRS)

    Densmore, A.

    1994-01-01

    The Jet Propulsion Laboratory (JPL) has recently begun the development of a Broadband Aeronauical Terminal (BAT) for duplex video satellite communications on commercial or business class aircraft. The BAT is designed for use with NASA's K/Ka-band Advanced Communications Technology Satellite (ACTS).

  7. NASIS data base management system - IBM 360/370 OS MVT implementation. 7: Data base administrator user's guide

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The Data Base Administrator User's Guide for the NASA Aerospace Safety information system is presented. The subjects discussed are: (1) multi-terminal tasking, (2) data base executive, (3) utilities, (4) maintenance, and (5) update mode functions.

  8. Multi-junction Thin-film Solar Cells on Flexible Substrates for Space Power

    NASA Technical Reports Server (NTRS)

    Hepp, Aloysius F.; Smith, Mark; Scofield, John H.; Dickman, John E.; Lush, Gregory B.; Morel, Donald L.; Ferekides, Christos; Dhere, Neelkanth G.

    2002-01-01

    The ultimate objective of the thin-film program at NASA GRC is development of a 20 percent AM0 thin-film device technology with high power/weight ratio. Several approaches are outlined to improve overall device efficiency and power/weight ratio. One approach involves the use of very lightweight flexible substrates such as polyimides (i.e., Kapton(Trademark)) or metal foil. Also, a compound semiconductor tandem device structure that can meet this objective is proposed and simulated using Analysis of Microelectronic and Photonic Structures (AMPS). AMPS modeling of current devices in tandem format indicate that AM0 efficiencies near 20 percent can be achieved. And with improvements in materials, efficiencies approaching 25 percent are achievable. Several important technical issues need to be resolved to realize these complex devices: development of a wide bandgap material with good electronic properties, development of transparent contacts, and targeting a 2-terminal device structure (with more complicated processing and tunnel junction) or 4-terminal device. Recent progress in the NASA GRC program is outlined.

  9. Ground terminal expert (GTEX). Part 2: Expert system diagnostics for a 30/20 Gigahertz satellite transponder

    NASA Technical Reports Server (NTRS)

    Durkin, John; Schlegelmilch, Richard; Tallo, Donald

    1992-01-01

    A research effort was undertaken to investigate how expert system technology could be applied to a satellite communications system. The focus of the expert system is the satellite earth station. A proof of concept expert system called the Ground Terminal Expert (GTEX) was developed at the University of Akron in collaboration with the NASA Lewis Research Center. With the increasing demand for satellite earth stations, maintenance is becoming a vital issue. Vendors of such systems will be looking for cost effective means of maintaining such systems. The objective of GTEX is to aid in diagnosis of faults occurring with the digital earth station. GTEX was developed on a personal computer using the Automated Reasoning Tool for Information Management (ART-IM) developed by the Inference Corporation. Developed for the Phase 2 digital earth station, GTEX is a part of the Systems Integration Test and Evaluation (SITE) facility located at the NASA Lewis Research Center.

  10. Jovian Stormy Weather

    NASA Image and Video Library

    2017-02-17

    NASA's Juno spacecraft soared directly over Jupiter's south pole when JunoCam acquired this image on February 2, 2017 at 6:06 a.m. PT (9:06 a.m. ET), from an altitude of about 62,800 miles (101,000 kilometers) above the cloud tops. From this unique vantage point we see the terminator (where day meets night) cutting across the Jovian south polar region's restless, marbled atmosphere with the south pole itself approximately in the center of that border. The terminator is offset a bit because it's summer in Jupiter's southern hemisphere. However, the tilt of Jupiter's spin axis is only 3 degrees, much less than Earth's 23.5-degree tilt. This image was processed by citizen scientist John Landino. This enhanced color version highlights the bright high clouds and numerous meandering oval storms. Away from the polar region, the seeming chaos of Jupiter's polar region gives way to the more familiar color banding that Jupiter is known for. http://photojournal.jpl.nasa.gov/catalog/PIA21382

  11. KSC-08pd0458

    NASA Image and Video Library

    2008-02-23

    KENNEDY SPACE CENTER, FLA. -- STS-123 Mission Specialist Takao Doi, of the Japan Aerospace Exploration Agency, awaits his turn to address the news media on hand for his arrival at NASA Kennedy Space Center's Shuttle Landing Facility. The crew for space shuttle Endeavour's STS-123 mission is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  12. KSC-08pd0499

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew of space shuttle Endeavour's STS-123 mission answers questions from the media during a break from emergency egress training. From left are From left are Commander Dominic Gorie; Mission Specialist Garrett Reisman; Pilot Gregory H. Johnson; and Mission Specialists Robert L. Behnken, Mike Foreman, Takao Doi of the Japan Aerospace Exploration Agency and Rick Linnehan. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  13. KSC-08pd0504

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission traverses the exit route from the White Room during instruction on emergency egress from the pad. From back to front are Mission Specialist Mike Foreman, Commander Dominic Gorie, Pilot Gregory H. Johnson and Mission Specialists Takao Doi of the Japan Aerospace Exploration Agency and Garrett Reisman. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  14. KSC-08pd0461

    NASA Image and Video Library

    2008-02-23

    KENNEDY SPACE CENTER, FLA. -- STS-123 Mission Specialist Takao Doi, of the Japan Aerospace Exploration Agency, addresses the news media on hand for his arrival at NASA Kennedy Space Center's Shuttle Landing Facility. The crew for space shuttle Endeavour's STS-123 mission is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  15. KSC-08pd0492

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission takes time out from training activities to pose for a group portrait. From left are Pilot Gregory H. Johnson; Commander Dominic Gorie and Mission Specialists Mike Foreman, Garrett Reisman, Rick Linnehan, Takao Doi of the Japan Aerospace Exploration Agency and Robert L. Behnken. Endeavour is on the pad in the background. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  16. KSC-08pd0506

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission receives instruction for emergency egress from the pad. In blue flight suits, from left, are Mission Specialist Mike Foreman; Pilot Gregory H. Johnson; Mission Specialists Takao Doi of the Japan Aerospace Exploration Agency, Garrett Reisman and Robert L. Behnken; and Commander Dominic Gorie. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  17. KSC-08pd0455

    NASA Image and Video Library

    2008-02-23

    KENNEDY SPACE CENTER, FLA. -- STS-123 Mission Specialist Takao Doi of the Japan Aerospace Exploration Agency, at left, is greeted by Shuttle Launch Director Mike Leinbach following his arrival at NASA Kennedy Space Center's Shuttle Landing Facility. The crew for space shuttle Endeavour's STS-123 mission is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  18. KSC-08pd0516

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission receives instruction on the operation of a slidewire basket during emergency egress training. Mission Specialist Takao Doi of the Japan Aerospace Exploration Agency observes from the basket as Mission Specialist Rick Linnehan steadies the basket for Mission Specialist Garrett Reisman to jump to the ground. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  19. KSC-08pd0505

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission receives instruction for emergency egress from the pad. In blue flight suits, from left, are Mission Specialist Mike Foreman; Pilot Gregory H. Johnson; Mission Specialists Takao Doi of the Japan Aerospace Exploration Agency, Garrett Reisman and Robert L. Behnken; and Commander Dominic Gorie. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  20. KSC-08pd0509

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission receives instruction on the operation of a slidewire basket during emergency egress training. From top left are Pilot Gregory H. Johnson and Commander Dominic Gorie. In the basket are Mission Specialists Rick Linnehan, Garrett Reisman and Takao Doi of the Japan Aerospace Exploration Agency. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  1. Simulated Rotor Wake Interactions Resulting from Civil Tiltrotor Aircraft Operations Near Vertiport Terminals

    NASA Technical Reports Server (NTRS)

    Young, Larry A.; Rajagopalan, Ganesh

    2013-01-01

    A mid-fidelity computational fluid dynamics tool called RotCFD - specifically developed to aid in rotorcraft conceptual design efforts - has been applied to the study of rotor wake interactions of civil tiltrotor aircraft in the immediate vicinity of vertiport/airport ground infrastructure. This issue has grown in importance as previous NASA studies have suggested that civil tiltrotor aircraft can potentially have a significant impact on commercial transport aviation. Current NASA reference designs for such civil tiltrotor aircraft are focused on a size category of 90-120 passengers. Notional concepts of operations include simultaneous non-interfering flight into and out of congested airports having vertiports, that is, prepared VTOL takeoff and landing zones, or underutilized short runways for STOL operation. Such large gross-weight vehicles will be generating very high induced velocities. Inevitably, the interaction of the rotor wake with ground infrastructure such as terminals/jetways must be considered both from an operational as well as design perspective.

  2. New design and operating techniques and requirements for improved aircraft terminal area operations

    NASA Technical Reports Server (NTRS)

    Reeder, J. P.; Taylor, R. T.; Walsh, T. M.

    1974-01-01

    Current aircraft operating problems that must be alleviated for future high-density terminal areas are safety, dependence on weather, congestion, energy conservation, noise, and atmospheric pollution. The Microwave Landing System (MLS) under development by FAA provides increased capabilities over the current ILS. The development of the airborne system's capability to take maximum advantage of the MLS capabilities in order to solve terminal area problems are discussed. A major limiting factor in longitudinal spacing for capacity increase is the trailing vortex hazard. Promising methods for causing early dissipation of the vortices were explored. Flight procedures for avoiding the hazard were investigated. Terminal configured vehicles and their flight test development are discussed.

  3. Airport Surface Delays and Causes: A Preliminary Analysis

    NASA Technical Reports Server (NTRS)

    Chin, David K.; Goldberg, Jay; Tang, Tammy

    1997-01-01

    This report summarizes FAA Program Analysis and Operations Research Service (ASD-400)/Lockheed Martin activities and findings related to airport surface delays and causes, in support of NASA Langley Research Center's Terminal Area Productivity (TAP) Program. The activities described in this report were initiated in June 1995. A preliminary report was published on September 30, 1995. The final report incorporates data collection forms filled out by traffic managers, other FAA staff, and an airline for the New York City area, some updates, data previously requested from various sources to support this analysis, and further quantification and documentation than in the preliminary report. This final report is based on data available as of April 12, 1996. This report incorporates data obtained from review and analysis of data bases and literature, discussions/interviews with engineers, air-traffic staff, other FAA technical personnel, and airline staff, site visits, and a survey on surface delays and causes. It includes analysis of delay statistics; preliminary findings and conclusions on surface movement, surface delay sources and causes, runway occupancy time (ROT), and airport characteristics impacting surface operations and delays; and site-specific data on the New York City area airports, which are the focus airports for this report.

  4. Modeling of terminal-area airplane fuel consumption

    DOT National Transportation Integrated Search

    2009-08-01

    Accurate modeling of airplane fuel consumption is necessary for air transportation policy-makers to properly : adjudicate trades between competing environmental and economic demands. Existing public models used for : computing terminal-area airplane ...

  5. KSC-08pd1269

    NASA Image and Video Library

    2008-05-09

    CAPE CANAVERAL, Fla. -- The STS-124 crew departs NASA's Kennedy Space Center after a successful launch dress rehearsal called the terminal countdown demonstration test. Seated in the T-38 training jet, Mission Specialist Mike Fossum is ready to put on his helmet for the flight back to Houston. The crew is expected to return in late May for the May 31 launch of space shuttle Discovery. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Photo credit: NASA/Kim Shiflett

  6. KSC-08pd1266

    NASA Image and Video Library

    2008-05-09

    CAPE CANAVERAL, Fla. -- The crew for the STS-124 mission departs NASA's Kennedy Space Center after a successful launch dress rehearsal called the terminal countdown demonstration test. Seen here are Commander Mark Kelly and Mission Specialist Greg Chamitoff heading for the T-38 training jets for their flight back to Houston. The crew is expected to return in late May for the May 31 launch of space shuttle Discovery. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Photo credit: NASA/Kim Shiflett

  7. KSC-08pd1265

    NASA Image and Video Library

    2008-05-09

    CAPE CANAVERAL, Fla. -- The crew for the STS-124 mission departs NASA's Kennedy Space Center after a successful launch dress rehearsal called the terminal countdown demonstration test. Seen here are Mission Specialists Ron Garan and Karen Nyberg heading for the T-38 training jets for their flight back to Houston. The crew is expected to return in late May for the May 31 launch of space shuttle Discovery. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Photo credit: NASA/Kim Shiflett

  8. Trends in NASA communication satellites.

    NASA Technical Reports Server (NTRS)

    Sivo, J. N.; Robbins, W. H.; Stretchberry, D. M.

    1972-01-01

    Discussion of the potential applications of satellite communications technology in meeting the national needs in education, health care, culture, and data transfer techniques. Experiments with the NASA ATS 1, 3 and 5 spacecraft, which are conducted in an attempt to satisfy such needs, are reviewed. The future needs are also considered, covering the requirements of multiple region coverage, communications between regions, large numbers of ground terminals, multichannel capability and high quality TV pictures. The ATS F and CTS spacecraft are expected to be available in the near future to expand experiments in this field.

  9. Snakeskin Terrain

    NASA Image and Video Library

    2015-09-24

    In this extended color image of Pluto taken by NASA New Horizons spacecraft, rounded and bizarrely textured mountains, informally named the Tartarus Dorsa, rise up along Pluto's day-night terminator and show intricate but puzzling patterns of blue-gray ridges and reddish material in between. This view, roughly 330 miles (530 kilometers) across, combines blue, red and infrared images taken by the Ralph/Multispectral Visual Imaging Camera (MVIC) on July 14, 2015, and resolves details and colors on scales as small as 0.8 miles (1.3 kilometers). http://photojournal.jpl.nasa.gov/catalog/PIA19957

  10. KSC-07pd2716

    NASA Image and Video Library

    2007-10-08

    KENNEDY SPACE CENTER, FLA. -- STS-120 Mission Specialist Paolo Nespoli tries on his gloves with his launch and entry suit, preparing for launch. Nespoli represents the European Space Agency. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center. The TCDT also includes emergency egress procedures, equipment familiarization and a simulated launch countdown. Mission STS-120, which will carry the Italian-built U.S. Node 2 to the International Space Station, is targeted for launch on Oct. 23. Photo credit: NASA/Kim Shiflett

  11. Modifying and Testing ATC Controller Interface (CI) for Data Link Clearances

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The Controller-Pilot Data Link Communications (CPDLC) and Air Traffic Control workstation research was conducted as part of the 1997 NASA Low Visibility Landing and Surface Operations (LVLASO) demonstration program at Atlanta Hartsfield airport. Research activity under this grant increased the sophistication of the Controllers' Communication and Situational Awareness Terminal (C-CAST) and developed a VHF Data Link -Mode 2 communications platform. The research culminated with participation in the 2000 NASA Aviation Safety Program's Synthetic Vision System (SVS) / Runway Incursion Prevention System (RIPS) flight demonstration at Dallas-Fort Worth Airport.

  12. KSC-2009-3408

    NASA Image and Video Library

    2009-06-03

    CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Dave Wolf answers a question during a session with the media at NASA Kennedy Space Center's Launch Pad 39A. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency egress training and equipment familiarization. Space shuttle Endeavour's STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex on the International Space Station. Endeavour's launch is targeted for June 13. Photo credit: NASA/Kim Shiflett

  13. KSC-2009-3409

    NASA Image and Video Library

    2009-06-03

    CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Julie Payette answers a question during a session with the media at NASA Kennedy Space Center's Launch Pad 39A. Payette represents the Canadian Space Agency. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency egress training and equipment familiarization. Space shuttle Endeavour's STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex on the International Space Station. Endeavour's launch is targeted for June 13. Photo credit: NASA/Kim Shiflett

  14. KSC-2009-3406

    NASA Image and Video Library

    2009-06-03

    CAPE CANAVERAL, Fla. – STS-127 Pilot Doug Hurley answers a question from the media during a session with the media at NASA Kennedy Space Center's Launch Pad 39A. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency egress training and equipment familiarization. Space shuttle Endeavour's STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex on the International Space Station. Endeavour's launch is targeted for June 13. Photo credit: NASA/Kim Shiflett

  15. Light microscopic image analysis system to quantify immunoreactive terminal area apposed to nerve cells.

    PubMed

    Wu, L C; D'Amelio, F; Fox, R A; Polyakov, I; Daunton, N G

    1997-06-06

    The present report describes a desktop computer-based method for the quantitative assessment of the area occupied by immunoreactive terminals in close apposition to nerve cells in relation to the perimeter of the cell soma. This method is based on Fast Fourier Transform (FFT) routines incorporated in NIH-Image public domain software. Pyramidal cells of layer V of the somatosensory cortex outlined by GABA immunolabeled terminals were chosen for our analysis. A Leitz Diaplan light microscope was employed for the visualization of the sections. A Sierra Scientific Model 4030 CCD camera was used to capture the images into a Macintosh Centris 650 computer. After preprocessing, filtering was performed on the power spectrum in the frequency domain produced by the FFT operation. An inverse FFT with filter procedure was employed to restore the images to the spatial domain. Pasting of the original image to the transformed one using a Boolean logic operation called 'AND'ing produced an image with the terminals enhanced. This procedure allowed the creation of a binary image using a well-defined threshold of 128. Thus, the terminal area appears in black against a white background. This methodology provides an objective means of measurement of area by counting the total number of pixels occupied by immunoreactive terminals in light microscopic sections in which the difficulties of labeling intensity, size, shape and numerical density of terminals are avoided.

  16. Light microscopic image analysis system to quantify immunoreactive terminal area apposed to nerve cells

    NASA Technical Reports Server (NTRS)

    Wu, L. C.; D'Amelio, F.; Fox, R. A.; Polyakov, I.; Daunton, N. G.

    1997-01-01

    The present report describes a desktop computer-based method for the quantitative assessment of the area occupied by immunoreactive terminals in close apposition to nerve cells in relation to the perimeter of the cell soma. This method is based on Fast Fourier Transform (FFT) routines incorporated in NIH-Image public domain software. Pyramidal cells of layer V of the somatosensory cortex outlined by GABA immunolabeled terminals were chosen for our analysis. A Leitz Diaplan light microscope was employed for the visualization of the sections. A Sierra Scientific Model 4030 CCD camera was used to capture the images into a Macintosh Centris 650 computer. After preprocessing, filtering was performed on the power spectrum in the frequency domain produced by the FFT operation. An inverse FFT with filter procedure was employed to restore the images to the spatial domain. Pasting of the original image to the transformed one using a Boolean logic operation called 'AND'ing produced an image with the terminals enhanced. This procedure allowed the creation of a binary image using a well-defined threshold of 128. Thus, the terminal area appears in black against a white background. This methodology provides an objective means of measurement of area by counting the total number of pixels occupied by immunoreactive terminals in light microscopic sections in which the difficulties of labeling intensity, size, shape and numerical density of terminals are avoided.

  17. Videoconferencing via Satellite: Opening Congress to the People. Final Report.

    ERIC Educational Resources Information Center

    Wood, Fred B.; And Others

    This evaluative study investigated through actual demonstrations the effectiveness of satellite videoconferencing in providing a new mechanism for informed dialogue between congressmen and constituents, thus strengthening the legislative process. In this experiment, the use of NASA's portable earth terminal was instrumental in making satellite…

  18. NASA Aviation Safety Reporting System

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A comprehensive study of near midair collisions in terminal airspace, derived from the ASRS database is presented. A selection of controller and pilot reports on airport perimeter security, unauthorized takeoffs and landings, and on winter operations is presented. A sampling of typical Alert Bulletins and their responses is presented.

  19. Evaluation of two cockpit display concepts for civil tiltrotor instrument operations on steep approaches

    NASA Technical Reports Server (NTRS)

    Decker, William A.; Bray, Richard S.; Simmons, Rickey C.; Tucker, George E.

    1993-01-01

    A piloted simulation experiment was conducted using the NASA Ames Research Center Vertical Motion Simulator to evaluate two cockpit display formats designed for manual control on steep instrument approaches for a civil transport tiltrotor aircraft. The first display included a four-cue (pitch, roll, power lever position, and nacelle angle movement prompt) flight director. The second display format provided instantaneous flight path angle information together with other symbols for terminal area guidance. Pilots evaluated these display formats for an instrument approach task which required a level flight conversion from airplane-mode flight to helicopter-mode flight while decelerating to the nominal approach airspeed. Pilots tracked glide slopes of 6, 9, 15 and 25 degrees, terminating in a hover for a vertical landing on a 150 feet square vertipad. Approaches were conducted with low visibility and ceilings and with crosswinds and turbulence, with all aircraft systems functioning normally and were carried through to a landing. Desired approach and tracking performance was achieved with generally satisfactory handling qualities using either display format on glide slopes up through 15 degrees. Evaluations with both display formats for a 25 degree glide slope revealed serious problems with glide slope tracking at low airspeeds in crosswinds and the loss of the intended landing spot from the cockpit field of view.

  20. Preliminary Design and Analysis of an In-plane PRSEUS Joint

    NASA Technical Reports Server (NTRS)

    Lovejoy, Andrew E.; Poplawski, Steven

    2013-01-01

    As part of the National Aeronautics and Space Administration's (NASA's) Environmentally Responsible Aviation (ERA) program, the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) has been designed, developed and tested. However, PRSEUS development efforts to date have only addressed joints required to transfer bending moments between PRSEUS panels. Development of in-plane joints for the PRSEUS concept is necessary to facilitate in-plane transfer of load from PRSEUS panels to an adjacent structure, such as from a wing panel into a fuselage. This paper presents preliminary design and analysis of an in-plane PRSEUS joint for connecting PRSEUS panels at the termination of the rod-stiffened stringers. Design requirements are provided, the PRSEUS blade joint concept is presented, and preliminary design changes and analyses are carried out to examine the feasibility of the proposed in-plane PRSEUS blade joint. The study conducted herein focuses mainly on the PRSEUS structure on one side of the joint. In particular, the design requirements for the rod shear stress and bolt bearing stress are examined. A PRSEUS blade joint design was developed that demonstrates the feasibility of this in-plane PRSEUS joint concept to terminate the rod-stiffened stringers. The presented design only demonstrates feasibility, therefore, some areas of refinement are presented that would lead to a more optimum and realistic design.

  1. Terminal Area Conflict Detection and Resolution Tool

    NASA Technical Reports Server (NTRS)

    Verma, Savita Arora

    2011-01-01

    This poster will describe analysis of a conflict detection and resolution tool for the terminal area called T-TSAFE. With altitude clearance information, the tool can reduce false alerts to as low as 2 per hour.

  2. NASA procurement report, FY 1992

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.

  3. Overview of the MARS Laser Communications Demonstration Project

    NASA Technical Reports Server (NTRS)

    Edward, Bernard L.; Townes, Stephen A.; Bondurant, Roy S.; Scozzafava, Joseph J.; Boroson, Don M.; Parvin, Ben A.; Biswas, Abhijit; Pillsbury, Alan D.; Khatri, Farzana I.; Burnside, Jamie W.

    2003-01-01

    This paper provides an overview of the Mars Laser Communications Demonstration Project, a joint project between NASA s Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). It reviews the strawman designs for the flight and ground segments, the critical technologies required, and the concept of operations. It reports preliminary conclusions from the Mars Lasercom Study conducted at MIT/LL and on additional work done at JPL and GSFC. The lasercom flight terminal will be flown on the Mars Telecom Orbiter (MTO) to be launched by NASA in 2009, and will demonstrate a technology which has the potential of vastly improving NASA s ability to communicate throughout the solar system.

  4. Airborne Precision Spacing: A Trajectory-based Approach to Improve Terminal Area Operations

    NASA Technical Reports Server (NTRS)

    Barmore, Bryan

    2006-01-01

    Airborne Precision Spacing has been developed by the National Aeronautics and Space Administration (NASA) over the past seven years as an attempt to benefit from the capabilities of the flight deck to precisely space their aircraft relative to another aircraft. This development has leveraged decades of work on improving terminal area operations, especially the arrival phase. With APS operations, the air traffic controller instructs the participating aircraft to achieve an assigned inter-arrival spacing interval at the runway threshold, relative to another aircraft. The flight crew then uses airborne automation to manage the aircraft s speed to achieve the goal. The spacing tool is designed to keep the speed within acceptable operational limits, promote system-wide stability, and meet the assigned goal. This reallocation of tasks with the controller issuing strategic goals and the flight crew managing the tactical achievement of those goals has been shown to be feasible through simulation and flight test. A precision of plus or minus 2-3 seconds is generally achievable. Simulations of long strings of arriving traffic show no signs of instabilities or compression waves. Subject pilots have rated the workload to be similar to current-day operations and eye-tracking data substantiate this result. This paper will present a high-level review of research results over the past seven years from a variety of tests and experiments. The results will focus on the precision and accuracy achievable, flow stability and some major sources of uncertainty. The paper also includes a summary of the flight crew s procedures and interface and a brief concept overview.

  5. Proving the correctness of the flight director program EADIFD, volume 1

    NASA Technical Reports Server (NTRS)

    Lee, F. J.; Maurer, W. D.

    1977-01-01

    EADIFD is written in symbolic assembly language for execution on the C4000 airborne computer. It is a subprogram of an aircraft navigation and guidance program and is used to generate pitch and roll command signals for use in terminal airspace. The proof of EADIFD was carried out by an inductive assertion method consisting of two parts, a verification condition generator and a source language independent proof checker. With the specifications provided by NASA, EADIFD was proved correct. The termination of the program is guaranteed and the program contains no instructions that can modify it under any conditions.

  6. KSC-2011-2732

    NASA Image and Video Library

    2011-04-01

    CAPE CANAVERAL, Fla. -- STS-134 Commander Mark Kelly prepares to depart the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida aboard a T-38 jet. While at Kennedy, space shuttle Endeavour's crew participated in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training. Kelly will return to NASA's Johnson Space Center in Houston to resume training for the upcoming STS-134 mission. Endeavour and its six STS-134 crew members will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the International Space Station. This will be the final spaceflight for Endeavour. Launch is targeted for April 29 at 3:47 p.m. EDT. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett

  7. KSC-2011-2731

    NASA Image and Video Library

    2011-04-01

    CAPE CANAVERAL, Fla. -- STS-134 Mission Specialist Michael Fincke prepares to depart the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida aboard a T-38 jet. While at Kennedy, space shuttle Endeavour's crew participated in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training. Fincke will return to NASA's Johnson Space Center in Houston to resume training for the upcoming STS-134 mission. Endeavour and its six STS-134 crew members will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the International Space Station. This will be the final spaceflight for Endeavour. Launch is targeted for April 29 at 3:47 p.m. EDT. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett

  8. 33 CFR 165.1198 - Safety zone; Military Ocean Terminal Concord Safety Zone, Suisun Bay, Military Ocean Terminal...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Safety zone; Military Ocean Terminal Concord Safety Zone, Suisun Bay, Military Ocean Terminal Concord, CA. 165.1198 Section 165.1198... Limited Access Areas Eleventh Coast Guard District § 165.1198 Safety zone; Military Ocean Terminal Concord...

  9. 33 CFR 165.1198 - Safety zone; Military Ocean Terminal Concord Safety Zone, Suisun Bay, Military Ocean Terminal...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Safety zone; Military Ocean Terminal Concord Safety Zone, Suisun Bay, Military Ocean Terminal Concord, CA. 165.1198 Section 165.1198... Limited Access Areas Eleventh Coast Guard District § 165.1198 Safety zone; Military Ocean Terminal Concord...

  10. Moon - 18 Image Mosaic

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This mosaic picture of the Moon was compiled from 18 images taken with a green filter by Galileo's imaging system during the spacecraft's flyby on December 7, 1992, some 11 hours before its Earth flyby at 1509 UTC (7:09 a.m. Pacific Standard Time) December 8. The north polar region is near the top part of the mosaic, which also shows Mare Imbrium, the dark area on the left; Mare Serenitatis at center; and Mare Crisium, the circular dark area to the right. Bright crater rim and ray deposits are from Copernicus, an impact crater 96 kilometers (60 miles) in diameter. Computer processing has exaggerated the brightness of poorly illuminated features near the day/night terminator in the polar regions, giving a false impression of high reflectivity there. The digital image processing was done by DLR the German aerospace research establishment near Munich, an international collaborator in the Galileo mission. The Galileo project, whose primary mission is the exploration of the Jupiter system in 1995-97, is managed for NASA's Office of Space Science and Applications by the Jet Propulsion Laboratory.

  11. Mine-Resistant Ambush-Protection vehicles

    NASA Image and Video Library

    2014-02-13

    CAPE CANAVERAL, Fla. – One of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles sits near space shuttle-era M-113 vehicles at the Maintenance and Operations Facility at NASA’s Kennedy Space Center in Florida. The MRAPs arrived from the U.S. Army Red River Depot in Texarkana, Texas in December 2013. The vehicles were processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage. The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  12. Mine-Resistant Ambush-Protection vehicles

    NASA Image and Video Library

    2014-02-13

    CAPE CANAVERAL, Fla. – One of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles is driven to the Maintenance and Operations Facility at Kennedy Space Center in Florida. The MRAPs arrived from the U.S. Army Red River Depot in Texarkana, Texas in December 2013. The vehicles were processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage. The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  13. Mine-Resistant Ambush-Protection vehicles

    NASA Image and Video Library

    2014-02-13

    CAPE CANAVERAL, Fla. – A URS Federal Services worker pulls down the steps to the entrance of one of the four new emergency egress vehicles, called Mine-Resistant Ambush-Protected, or MRAP, vehicles at the Maintenance and Operations Facility at NASA’s Kennedy Space Center in Florida. The MRAPs arrived from the U.S. Army Red River Depot in Texarkana, Texas in December 2013. The vehicles were processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage. The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  14. Mine-Resistant Ambush-Protection vehicles

    NASA Image and Video Library

    2014-02-13

    CAPE CANAVERAL, Fla. – A view of the interior of one of four new emergency egress vehicles, called Mine-Resistant Ambush-Protected, or MRAP, vehicles is shown. The MRAPs are at the Maintenance and Operations Facility at NASA’s Kennedy Space Center in Florida. The MRAPs arrived from the U.S. Army Red River Depot in Texarkana, Texas in December 2013. The vehicles were processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage. The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  15. X-48C Hybrid - Blended Wing Body Demonstrator

    NASA Image and Video Library

    2013-02-28

    Earth and sky met as the X-48C Hybrid Wing Body aircraft flew over Edwards Air Force Base on Feb. 28, 2013, from NASA's Dryden Flight Research Center, Edwards, CA. The long boom protruding from between the tails is part of the aircraft's parachute-deployment flight termination system.

  16. 9 CFR 3.117 - Terminal facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... must not commingle marine mammal shipments with inanimate cargo. All animal holding areas of a terminal... containing marine mammals when the air temperature within such animal holding area is 23.9 °C (75 °F) or higher. The air temperature around any marine mammal in any animal holding area must not be allowed to...

  17. 9 CFR 3.117 - Terminal facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must not commingle marine mammal shipments with inanimate cargo. All animal holding areas of a terminal... containing marine mammals when the air temperature within such animal holding area is 23.9 °C (75 °F) or higher. The air temperature around any marine mammal in any animal holding area must not be allowed to...

  18. 9 CFR 3.117 - Terminal facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... must not commingle marine mammal shipments with inanimate cargo. All animal holding areas of a terminal... containing marine mammals when the air temperature within such animal holding area is 23.9 °C (75 °F) or higher. The air temperature around any marine mammal in any animal holding area must not be allowed to...

  19. 9 CFR 3.117 - Terminal facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... must not commingle marine mammal shipments with inanimate cargo. All animal holding areas of a terminal... containing marine mammals when the air temperature within such animal holding area is 23.9 °C (75 °F) or higher. The air temperature around any marine mammal in any animal holding area must not be allowed to...

  20. 9 CFR 3.117 - Terminal facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must not commingle marine mammal shipments with inanimate cargo. All animal holding areas of a terminal... containing marine mammals when the air temperature within such animal holding area is 23.9 °C (75 °F) or higher. The air temperature around any marine mammal in any animal holding area must not be allowed to...

  1. GTEX: An expert system for diagnosing faults in satellite ground stations

    NASA Technical Reports Server (NTRS)

    Schlegelmilch, Richard F.; Durkin, John; Petrik, Edward J.

    1991-01-01

    A proof of concept expert system called Ground Terminal Expert (GTEX) was developed at The University of Akron in collaboration with NASA Lewis Research Center. The objective of GTEX is to aid in diagnosing data faults occurring with a digital ground terminal. This strategy can also be applied to the Very Small Aperture Terminal (VSAT) technology. An expert system which detects and diagnoses faults would enhance the performance of the VSAT by improving reliability and reducing maintenance time. GTEX is capable of detecting faults, isolating the cause and recommending appropriate actions. Isolation of faults is completed to board-level modules. A graphical user interface provides control and a medium where data can be requested and cryptic information logically displayed. Interaction with GTEX consists of user responses and input from data files. The use of data files provides a method of simulating dynamic interaction between the digital ground terminal and the expert system. GTEX as described is capable of both improving reliability and reducing the time required for necessary maintenance.

  2. ACTS Aeronautical Terminal Experiment (AERO-X)

    NASA Technical Reports Server (NTRS)

    1995-01-01

    During the summer of 1994, the performance of an experimental mobile satellite communication system was demonstrated. Using the Advanced Communications Technology Satellite (ACTS) and the ACTS Mobile Terminal (AMT), the system demonstrated an active Monolithic Microwave Integrated Circuit (MMIC) phased-array antenna system. The antenna system was installed onboard one of NASA Lewis Research Center's research aircraft, a Learjet Model 25. It proved the viability of in-flight satellite communications services via small, flush, mountable electronic phased-array antennas. The overall system setup for the ACTS Aeronautical Terminal Experiment (AERO-X) is illustrated. The Link Evaluation Terminal (LET) at Lewis in Cleveland, Ohio, interfaced with fixed-AMT equipment, providing a seamless connection with the Public Service Telephone Network. As the Learjet was flown over several major cities across the U.S., this demonstration system allowed passengers onboard to make telephone calls as if they were using a cellular system. ACTS was operated in its microwave switch matrix mode with a spot beam for the Learjet and another spot beam dedicated to the LET.

  3. GTEX: An expert system for diagnosing faults in satellite ground stations

    NASA Astrophysics Data System (ADS)

    Schlegelmilch, Richard F.; Durkin, John; Petrik, Edward J.

    1991-11-01

    A proof of concept expert system called Ground Terminal Expert (GTEX) was developed at The University of Akron in collaboration with NASA Lewis Research Center. The objective of GTEX is to aid in diagnosing data faults occurring with a digital ground terminal. This strategy can also be applied to the Very Small Aperture Terminal (VSAT) technology. An expert system which detects and diagnoses faults would enhance the performance of the VSAT by improving reliability and reducing maintenance time. GTEX is capable of detecting faults, isolating the cause and recommending appropriate actions. Isolation of faults is completed to board-level modules. A graphical user interface provides control and a medium where data can be requested and cryptic information logically displayed. Interaction with GTEX consists of user responses and input from data files. The use of data files provides a method of simulating dynamic interaction between the digital ground terminal and the expert system. GTEX as described is capable of both improving reliability and reducing the time required for necessary maintenance.

  4. The Human Factors of FMS Usage in the Terminal Area

    DOT National Transportation Integrated Search

    1997-08-01

    The development of advanced automation for arrival aircraft into the terminal : area is being investigated for both the air traffic control (ATC) and airborne : environments. For the automation to be effective and provide the best advisory : informat...

  5. Gamma-aminobutyric acid (GABA) and neuropeptides in neural areas mediating motion-induced emesis

    NASA Technical Reports Server (NTRS)

    Damelio, F.; Daunton, Nancy G.; Fox, Robert A.

    1991-01-01

    Immunocytochemical methods were employed to localize the neurotransmitter amino acid gamma-aminobutyric acid and the neuropeptides substance P and Met-enkephalin in the area postrema (AP), area subpostrema (ASP), nucleus of the tractus solitarius (NTS), dorsal motor nucleus of the vagus nerve (DMNV), and lateral vestibular nucleus (LVN). Glutamic acid decarboxylase immunoreactive (GAD-IR) terminals and fibers were observed in the AP and particularly in the ASP. A gradual decrease in the density of terminals was seen towards the solitary complex. The DMNV revealed irregularly scattered GAD-IR terminals within the neuropil or closely surrounding neuronal cell bodies. The LVN, particularly the dorsal division, showed numerous axon terminals which were mostly localize around large neurons and their proximal dendrites. Substance P immunoreactive (SP-IR) terminals and fibers showed high density in the solitary complex, in particular within the lateral division. The ASP showed medium to low density of SP-IR fibers and terminals. The AP exhibited a small number of fibers and terminals irregularly distributed. The DMNV revealed a high density of SP-IR terminals and fibers that were mainly concentrated in the periphery. Very few terminals were detected in the LVN. Met-enkephalin immunoreactive (Met-Enk-IR) fibers and terminals showed high density and uniform distribution in the DMNV. Scattered terminals and fibers were observed in the AP, ASP, and NTS (particularly the lateral division). The very few fibers were observed in the LVN surrounded the neuronal cell bodies. The present report is part of a study designed to investigate the interaction between neuropeptides and conventional neurotransmitters under conditions producing motion sickness and in the process of sensory-motor adaptation.

  6. Analysis of space systems for the space disposal of nuclear waste follow-on study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The impact on space systems of three alternative waste mixes was evaluated as part of an effort to investigate the disposal of certain high-level nuclear wastes in space as a complement to mined geologic repositories. A brief overview of the study background, objectives, scope, approach and guidelines, and limitations is presented. The effects of variations in waste mixes on space system concepts were studied in order to provide data for determining relative total system risk benefits resulting from space disposal of the alternative waste mixes. Overall objectives of the NASA-DOE sustaining-level study program are to investigate space disposal concepts which can provide information to support future nuclear waste terminal storage programmatic decisions and to maintain a low level of research activity in this area to provide a baseline for future development should a decision be made to increase the emphasis on this option.

  7. Guidance and navigation for automatic landing, rollout, and turnoff using MLS and magnetic cable sensors

    NASA Technical Reports Server (NTRS)

    Pines, S.; Hueschen, R. M.

    1978-01-01

    This paper describes the navigation and guidance system developed for the TCV B-737, a Langley Field NASA research aircraft, and presents the results of an evaluation during final approach, landing, rollout and turnoff obtained through a nonlinear digital simulation. A Kalman filter (implemented in square root form) and a third order complementary filter were developed and compared for navigation. The Microwave Landing Systems (MLS) is used for all phases of the flight for navigation and guidance. In addition, for rollout and turnoff, a three coil sensor which detects the magnetic field induced by a buried wire in the runway (magnetic leader cable) is used. The outputs of the sensor are processed into measurements of position and heading deviation from the wire. The results show the concept to be both feasible and practical for commercial type aircraft terminal area control.

  8. Report on the Joint Eglin Acoustic Week III

    NASA Technical Reports Server (NTRS)

    Watts, Michael E.; Conner, David A.; Smith, Charles E.

    2008-01-01

    A series of three flight tests have been conducted at Eglin Air Force Base located in the Florida panhandle. The first was the Acoustics Week flight test conducted in September 2003. The second was the NASA Heavy Lift Rotorcraft Acoustic Flight Test conducted in October-November 2005. The most recent was the Eglin Acoustic Week III test conducted in August-September 2007. This series of tests have acquired acoustic data for a number of rotary and fixed wing aircraft that are used to generate noise semi-spheres used in predicting the acoustic footprint for prescribed flight operations. This extensive database can be used to determine the impact of flight operations on communities around a terminal area. Another valuable use of the semi-spheres is determining the long-range propagation of noise for civilian and military purposes. This paper will describe the third in this series of tests.

  9. V/STOLAND digital avionics system for XV-15 tilt rotor

    NASA Technical Reports Server (NTRS)

    Liden, S.

    1980-01-01

    A digital flight control system for the tilt rotor research aircraft provides sophisticated navigation, guidance, control, display and data acquisition capabilities for performing terminal area navigation, guidance and control research. All functions of the XV-15 V/STOLAND system were demonstrated on the NASA-ARC S-19 simulation facility under a comprehensive dynamic acceptance test. The most noteworthy accomplishments of the system are: (1) automatic configuration control of a tilt-rotor aircraft over the total operating range; (2) total hands-off landing to touchdown on various selectable straight-in glide slopes and on a flight path that includes a two-revolution helix; (3) automatic guidance along a programmed three-dimensional reference flight path; (4) navigation data for the automatic guidance computed on board, based on VOR/DME, TACAN, or MLS navid data; and (5) integration of a large set of functions in a single computer, utilizing 16k words of storage for programs and data.

  10. Hostel for the Hajjis

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Skidmore, Owings and Merrill (SOM), architects and engineers for the Haj Terminal, and the Saudi Ministry of Defense and Aviation needed to design some type of covered space that would process as many as 5,000 persons an hour and shelter up to 100,000 at a time during the annual haji pilgrimage. In this area, the temperature may reach 130 degrees Fahrenheit. The answer came from a fabric used by NASA in 1967 when they were looking for a new fabric for astronaut space suits. Owens Corning had been experimenting with an ultrafine pure glass finer yarn called Beta. The yarn was woven into a fabric, coated with Teflon and tailored for astronaut wear. SOM decided upon an open-sided, tented-roof structure with white Fiberglas fabric, coated with Teflon on both sides that reflects 75 percent of the solar radiation reaching the roof, thus helping to curb the intense heat.

  11. The ASLOTS concept: An interactive, adaptive decision support concept for Final Approach Spacing of Aircraft (FASA). FAA-NASA Joint University Program

    NASA Technical Reports Server (NTRS)

    Simpson, Robert W.

    1993-01-01

    This presentation outlines a concept for an adaptive, interactive decision support system to assist controllers at a busy airport in achieving efficient use of multiple runways. The concept is being implemented as a computer code called FASA (Final Approach Spacing for Aircraft), and will be tested and demonstrated in ATCSIM, a high fidelity simulation of terminal area airspace and airport surface operations. Objectives are: (1) to provide automated cues to assist controllers in the sequencing and spacing of landing and takeoff aircraft; (2) to provide the controller with a limited ability to modify the sequence and spacings between aircraft, and to insert takeoffs and missed approach aircraft in the landing flows; (3) to increase spacing accuracy using more complex and precise separation criteria while reducing controller workload; and (4) achieve higher operational takeoff and landing rates on multiple runways in poor visibility.

  12. CTAS: Computer intelligence for air traffic control in the terminal area

    NASA Technical Reports Server (NTRS)

    Erzberger, Heinz

    1992-01-01

    A system for the automated management and control of arrival traffic, referred to as the Center-TRACON Automation System (CTAS), has been designed by the ATC research group at NASA Ames research center. In a cooperative program, NASA and the FAA have efforts underway to install and evaluate the system at the Denver and Dallas/Ft. Worth airports. CTAS consists of three types of integrated tools that provide computer-generated intelligence for both Center and TRACON controllers to guide them in managing and controlling arrival traffic efficiently. One tool, the Traffic Management Advisor (TMA), establishes optimized landing sequences and landing times for aircraft arriving in the center airspace several hundred miles from the airport. In TRACON, TMA frequencies missed approach aircraft and unanticipated arrivals. Another tool, the Descent Advisor (DA), generates clearances for the center controllers handling at crossing times provided by TMA. In the TRACON, the final approach spacing tool (FAST) provides heading and speed clearances that produce and accurately spaced flow of aircraft on the final approach course. A data base consisting of aircraft performance models, airline preferred operational procedures and real time wind measurements contribute to the effective operation of CTAS. Extensive simulator evaluations of CTAS have demonstrated controller acceptance, delay reductions, and fuel savings.

  13. Experiment Description and Results for Arrival Operations Using Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR)

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Murdoch, Jennifer L.; Swieringa, Kurt A.; Barmore, Bryan E.; Capron, William R.; Hubbs, Clay E.; Shay, Richard F.; Abbott, Terence S.

    2013-01-01

    The predicted increase in the number of commercial aircraft operations creates a need for improved operational efficiency. Two areas believed to offer increases in aircraft efficiency are optimized profile descents and dependent parallel runway operations. Using Flight deck Interval Management (FIM) software and procedures during these operations, flight crews can achieve by the runway threshold an interval assigned by air traffic control (ATC) behind the preceding aircraft that maximizes runway throughput while minimizing additional fuel consumption and pilot workload. This document describes an experiment where 24 pilots flew arrivals into the Dallas Fort-Worth terminal environment using one of three simulators at NASA?s Langley Research Center. Results indicate that pilots delivered their aircraft to the runway threshold within +/- 3.5 seconds of their assigned time interval, and reported low workload levels. In general, pilots found the FIM concept, procedures, speeds, and interface acceptable. Analysis of the time error and FIM speed changes as a function of arrival stream position suggest the spacing algorithm generates stable behavior while in the presence of continuous (wind) or impulse (offset) error. Concerns reported included multiple speed changes within a short time period, and an airspeed increase followed shortly by an airspeed decrease.

  14. Comparison of In-Situ, Model and Ground Based In-Flight Icing Severity

    NASA Technical Reports Server (NTRS)

    Johnston, Christopher J.; Serke, David J.; Adriaansen, Daniel R.; Reehorst, Andrew L.; Politovich, Marica K.; Wolff, Cory A.; McDonough, Frank

    2011-01-01

    As an aircraft flies through supercooled liquid water, the liquid freezes instantaneously to the airframe thus altering its lift, drag, and weight characteristics. In-flight icing is a contributing factor to many aviation accidents, and the reliable detection of this hazard is a fundamental concern to aviation safety. The scientific community has recently developed products to provide in-flight icing warnings. NASA's Icing Remote Sensing System (NIRSS) deploys a vertically--pointing Ka--band radar, a laser ceilometer, and a profiling multi-channel microwave radiometer for the diagnosis of terminal area in-flight icing hazards with high spatial and temporal resolution. NCAR s Current Icing Product (CIP) combines several meteorological inputs to produce a gridded, three-dimensional depiction of icing severity on an hourly basis. Pilot reports are the best and only source of information on in-situ icing conditions encountered by an aircraft. The goal of this analysis was to ascertain how the testbed NIRSS icing severity product and the operational CIP severity product compare to pilot reports of icing severity, and how NIRSS and CIP compare to each other. This study revealed that the icing severity product from the ground-based NASA testbed system compared very favorably with the operational model-based product and pilot reported in-situ icing.

  15. Final-Approach Spacing Aids (FASA) evaluation for terminal-area, time-based air traffic control

    NASA Technical Reports Server (NTRS)

    Credeur, Leonard; Capron, William R.; Lohr, Gary W.; Crawford, Daniel J.; Tang, Dershuen A.; Rodgers, William G., Jr.

    1993-01-01

    A jointly funded (NASA/FAA) real-time simulation study was conducted at NASA Langley Research Center to gather comparative performance data among three candidate final-approach spacing aid (FASA) display formats. Several objective measures of controller performance and their display eye-scan behavior as well as subjective workload and rating questionnaires were used. For each of two representative pattern-speed procedures (a 170-knot procedure and a 210-knot procedure with speed control aiding), data were gathered, via twelve FAA controllers, using four final-controller display format conditions (manual/ARTS 3, graphic marker, DICE countdown, and centerline slot marker). Measured runway separations were more precise with both the graphic marker and DICE countdown formats than with the centerline slot marker and both (graphic and DICE) improved precision relative to the manual/ARTS 3 format. For three separate rating criteria, the subject controllers ranked the FASA formats in the same order: graphic marker, DICE countdown, and centerline slot marker. The increased precision measured with the 210-knot pattern-speed procedure may indicate the potential for the application of speed-control aiding where higher pattern speeds are practical after the base-to-final turn. Also presented are key FASA issues, a rationale for the formats selected for testing, and their description.

  16. Transiently increased colocalization of vesicular glutamate transporters 1 and 2 at single axon terminals during postnatal development of mouse neocortex: a quantitative analysis with correlation coefficient.

    PubMed

    Nakamura, Kouichi; Watakabe, Akiya; Hioki, Hiroyuki; Fujiyama, Fumino; Tanaka, Yasuyo; Yamamori, Tetsuo; Kaneko, Takeshi

    2007-12-01

    Vesicular glutamate transporter 1 (VGLUT1) and VGLUT2 show complementary distribution in neocortex; VGLUT1 is expressed mainly in axon terminals of neocortical neurons, whereas VGLUT2 is located chiefly in thalamocortical axon terminals. However, we recently reported a frequent colocalization of VGLUT1 and VGLUT2 at a subset of axon terminals in postnatal developing neocortex. We here quantified the frequency of colocalization between VGLUT1 and VGLUT2 immunoreactivities at single axon terminals by using the correlation coefficient (CC) as an indicator in order to determine the time course and spatial extent of the colocalization during postnatal development of mouse neocortex. The colocalization was more frequent in the primary somatosensory (S1) area than in both the primary visual (V1) and the motor areas; of area S1 cortical layers, colocalization was most evident in layer IV barrels at postnatal day (P) 7 and in adulthood. CC in layer IV showed a peak at P7 in area S1, and at P10 in area V1 though the latter peak was much smaller than the former. These results suggest that thalamocortical axon terminals contained not only VGLUT2 but also VGLUT1, especially at P7-10. Double fluorescence in situ hybridization confirmed coexpression of VGLUT1 and VGLUT2 mRNAs at P7 in the somatosensory thalamic nuclei and later in the thalamic dorsal lateral geniculate nucleus. As VGLUT1 is often used in axon terminals that show synaptic plasticity in adult brain, the present findings suggest that VGLUT1 is used in thalamocortical axons transiently during the postnatal period when plasticity is required.

  17. Ka-band MMIC array system for ACTS aeronautical terminal experiment (Aero-X)

    NASA Technical Reports Server (NTRS)

    Raquet, Charles A.; Zakrajsek, Robert J.; Lee, Richard Q.; Andro, Monty; Turtle, John P.

    1995-01-01

    During the summer of 1994, the Advanced Communication Technology Satellite (ACTS) Aeronautical Terminal Experiment (Aero-X) was successfully completed by the NASA Lewis Research Center (LeRC) and the Jet Propulsion Laboratory (JPL). 4.8 and 9.6 Kbps duplex voice links were established between the LeRC Learjet and the ACTS Link Evaluation Terminal (LET) in Cleveland, Ohio, via the ACTS. The antenna system used in this demonstration was developed by LeRC and featured LeRC and US Air Force experimental arrays using GaAs MMIC devices at each radiating element for electronic beam steering and distributed power amplification. The antenna system consisted of three arrays mounted inside the LeRC Learjet, pointing out through the windows. An open loop tracking controller developed by LeRC used information from the aircraft position and attitude sensors to automatically steer the arrays toward ACTS during flight JPL ACTS Mobile Terminal (AMT) system hardware was used as transceivers both on the aircraft and at the LET. The single 32 element MMIC transmit array developed by NASA/LeRC and Texas Instruments has an EIRP of 23.4 dBW at boresight. The two 20 GHz MMIC receive arrays were developed in a cooperative effort with the USAF Rome Laboratory/Electronic System Center, taking advantage of existing USAF array development contracts with Boeing and Martin Marietta. The Boeing array has 23 elements and a G/T of 16/6 db/degK at boresight. The Martin Marietta array has 16 elements and a G/T of 16.1 db/degK at boresight. The three proof-of-concept arrays, the array control system and their integration and operation in the Learjet for Aero-X are described.

  18. Flight Path Synthesis and HUD Scaling for V/STOL Terminal Area Operations

    DOT National Transportation Integrated Search

    1995-04-01

    A two circle horizontal flightpath synthesis algorithm for Vertical/Short : Takeoff and Landing (V/STOL) terminal area operations is presented. This : algorithm provides a flight-path that is tangential to the aircraft's velocity : vector at the inst...

  19. Preliminary survey of potential STOL terminal area operational requirements

    DOT National Transportation Integrated Search

    1971-06-01

    A preliminary survey of potential operational requirements for STOL in the terminal area was made. The presentation of the survey is in three sections. The first section presents the motivation for the survey. The second section discusses the markets...

  20. KSC-08pd1267

    NASA Image and Video Library

    2008-05-09

    CAPE CANAVERAL, Fla. -- The crew for the STS-124 mission departs NASA's Kennedy Space Center after a successful launch dress rehearsal called the terminal countdown demonstration test. Commander Mark Kelly (right) waits his turn to climb into the cockpit of the T-38 training jet for the flight back to Houston. Mission Specialist Greg Chamitoff is already seated. The crew is expected to return in late May for the May 31 launch of space shuttle Discovery. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Photo credit: NASA/Kim Shiflett

  1. KSC-08pd1174

    NASA Image and Video Library

    2008-05-07

    CAPE CANAVERAL, Fla. -- STS-124 Mission Specialist Akihiko Hoshide takes his place in the M113 armored personnel carrier, to practice driving as part of emergency training. He and other crew members are at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  2. KSC-08pd1171

    NASA Image and Video Library

    2008-05-07

    CAPE CANAVERAL, Fla. -- STS-124 Mission Specialist Ron Garan is pleased with his driving practice in the M113 armored personnel carrier, part of emergency training. He and other crew members are at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  3. KSC-08pd1182

    NASA Image and Video Library

    2008-05-07

    CAPE CANAVERAL, Fla. -- STS-124 Commander Mark Kelly is ready to practice driving the M113 armored personnel carrier as part of emergency training. He and other crew members are at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  4. KSC-08pd1180

    NASA Image and Video Library

    2008-05-07

    CAPE CANAVERAL, Fla. -- STS-124 Mission Specialist Mike Fossum stands ready to practice driving the M113 armored personnel carrier as part of emergency training. He and other crew members are at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  5. KSC-08pd1178

    NASA Image and Video Library

    2008-05-07

    CAPE CANAVERAL, Fla. -- STS-124 Mission Specialist Greg Chamitoff stands ready to practice driving the M113 armored personnel carrier as part of emergency training. He and other crew members are at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  6. KSC-08pd1166

    NASA Image and Video Library

    2008-05-07

    CAPE CANAVERAL, Fla. -- STS-124 Mission Specialist Karen Nyberg waits to begin training on the M113 armored personnel carrier on Launch Pad 39B. She and other crew members are at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System. Discovery's launch is targeted for May 31. Photo credit: NASA/Kim Shiflett

  7. KSC-2009-3405

    NASA Image and Video Library

    2009-06-03

    CAPE CANAVERAL, Fla. – During a question-and-answer session with the media at NASA Kennedy Space Center's Launch Pad 39A, STS-127 Mission Specialists Christopher Cassidy (left) and Dave Wolf banter about their shared experiences. The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency egress training and equipment familiarization. Space shuttle Endeavour's STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex on the International Space Station. Endeavour's launch is targeted for June 13. Photo credit: NASA/Kim Shiflett

  8. Intelligent Software for System Design and Documentation

    NASA Technical Reports Server (NTRS)

    2002-01-01

    In an effort to develop a real-time, on-line database system that tracks documentation changes in NASA's propulsion test facilities, engineers at Stennis Space Center teamed with ECT International of Brookfield, WI, through the NASA Dual-Use Development Program to create the External Data Program and Hyperlink Add-on Modules for the promis*e software. Promis*e is ECT's top-of-the-line intelligent software for control system design and documentation. With promis*e the user can make use of the automated design process to quickly generate control system schematics, panel layouts, bills of material, wire lists, terminal plans and more. NASA and its testing contractors currently use promis*e to create the drawings and schematics at the E2 Cell 2 test stand located at Stennis Space Center.

  9. NASA procurement report, FY 1993

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

  10. Promising More Information

    NASA Technical Reports Server (NTRS)

    2003-01-01

    When NASA needed a real-time, online database system capable of tracking documentation changes in its propulsion test facilities, engineers at Stennis Space Center joined with ECT International, of Brookfield, Wisconsin, to create a solution. Through NASA's Dual-Use Program, ECT developed Exdata, a software program that works within the company's existing Promise software. Exdata not only satisfied NASA s requirements, but also expanded ECT s commercial product line. Promise, ECT s primary product, is an intelligent software program with specialized functions for designing and documenting electrical control systems. An addon to AutoCAD software, Promis e generates control system schematics, panel layouts, bills of material, wire lists, and terminal plans. The drawing functions include symbol libraries, macros, and automatic line breaking. Primary Promise customers include manufacturing companies, utilities, and other organizations with complex processes to control.

  11. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  12. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  13. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  14. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  15. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  16. Defense Logistics: Space-Available Travel Challenges May Be Exacerbated If Eligibility Expands

    DTIC Science & Technology

    2012-09-10

    space-available travelers’ use of terminal facilities results in additional maintenance costs for waiting areas, restrooms, and vending machines ...additional required maintenance. For example, additional travelers’ use of waiting areas, restrooms, and vending machines in the terminals could require

  17. 1. TERMINAL ROOM, INTERIOR, SHOP LEVEL, SHOWING FIRE EXTINGUISHING SYSTEM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. TERMINAL ROOM, INTERIOR, SHOP LEVEL, SHOWING FIRE EXTINGUISHING SYSTEM PIPES AND VALVES AT LEFT. Looking southeast from entrance to terminal room. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  18. A Conceptual Design of a Departure Planner Decision Aid

    NASA Technical Reports Server (NTRS)

    Anagnostakis, Ioannis; Idris, Husni R.; Clark, John-Paul; Feron, Eric; Hansman, R. John; Odoni, Amedeo R.; Hall, William D.

    2000-01-01

    Terminal area Air Traffic Management handles both arriving and departing traffic. To date, research work on terminal area operations has focused primarily on the arrival flow and typically departures are taken into account only in an approximate manner. However, arrivals and departures are highly coupled processes especially in the terminal airspace, with complex interactions and sharing of the same airport resources between arrivals and departures taking place in practically every important terminal area. Therefore, the addition of automation aids for departures, possibly in co-operation with existing arrival flow automation systems, could have a profound contribution in enhancing the overall efficiency of airport operations. This paper presents the conceptual system architecture for such an automation aid, the Departure Planner (DP). This architecture can be used as a core in the development of decision-aiding systems to assist air traffic controllers in improving the performance of departure operations and optimize runway time allocation among different operations at major congested airports. The design of such systems is expected to increase the overall efficiency of terminal area operations and yield benefits for all stakeholders involved in Air Traffic Management (ATM) operations, users as well as service providers.

  19. Collaborative Arrival Planning: Data Sharing and User Preference Tools

    NASA Technical Reports Server (NTRS)

    Zelenka, Richard E.; Edwards, Thomas A. (Technical Monitor)

    1998-01-01

    Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

  20. Space Documentation Services: Operations Handbook.

    ERIC Educational Resources Information Center

    Raitt, D. I.

    A description of the system used by Space Documentation Service (SDS) to disseminate combined and accumulated knowledge, as widely as possible, throughout Europe is given. The RECON network, with the full support of NASA, has gradually been extended so that centers in Member States, may, by installing their own terminals, have direct access to the…

  1. TRIO: Turbulent Response in Oxygen

    NASA Technical Reports Server (NTRS)

    Hecht, J. H.; Clemmons, J. H.; Katz, N.; Ben-Ami, M.; Carranza, P. A.; Larsen, M.

    2005-01-01

    This project was designed to build on the results from the successful launch of the Turbulent Oxygen Mixing Experiment (TOMEX) mother-daughter (instrumented and chemical-release) payload (21.126) that was launched in October 2000 from the White Sands Missile Range. The overall science objective was to investigate the evolution of the atmospheric response. at altitudes between 80 and 120 km, to the presence of unstable regions with vertical scales of the order of 1 to 10 km. TRIO was designed to use Na lidar measurements from the MAUUMALT observation on MAUI with a launch of a payload from Pacific Missile Range Facility (PMRF), located on Kauai. During this project, Aerospace participated in a Mission Initiation Conference. put together a science requirements document. performed a site visit to PMRF. prepared a CDR document. and developed a production and calibration procedure for one of the payload instruments. the 3-channel photometer. Unfortunately. NASA decided to terminate the program because of unforeseen (by NASA) range costs. This CDR document represents our view of this project at termination and provides a roadmap to perform this experiment should it be proposed again.

  2. KSC-08pd0493

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission walks past an M-113 armored personnel carrier on their way to answer questions from the media. From left, in the front row are Pilot Gregory H. Johnson, Mission Specialist Garrett Reisman and Commander Dominic Gorie. In the middle row are Mission Specialists Mike Foreman and Robert L. Behnken. In the back row are Mission Specialists Rick Linnehan and Takao Doi of the Japan Aerospace Exploration Agency. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  3. KSC-08pd0464

    NASA Image and Video Library

    2008-02-23

    KENNEDY SPACE CENTER, FLA. -- The crew for space shuttle Endeavour's STS-123 mission head for the bus which will transport them to crew quarters following their arrival at NASA Kennedy Space Center's Shuttle Landing Facility. From left are Commander Dominic Gorie; Mission Specialists Garrett Reisman and Takao Doi of the Japan Aerospace Exploration Agency; Pilot Gregory H. Johnson; and Mission Specialists Rick Linnehan and Robert L. Behnken. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  4. KSC-08pd0503

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission takes time out from training activities to pose for a group portrait inside the White Room. From left, top row, are Commander Dominic Gorie and Mission Specialist Mike Foreman, and bottom row, are Mission Specialists Garrett Reisman and Robert L. Behnken, Pilot Gregory H. Johnson, and Mission Specialists Takao Doi of the Japan Aerospace Exploration Agency and Rick Linnehan. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  5. KSC-08pd0501

    NASA Image and Video Library

    2008-02-24

    KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission poses for a group portrait following a question-and-answer session with the media. From left are Commander Dominic Gorie; Mission Specialist Garrett Reisman; Pilot Gregory H. Johnson; and Mission Specialists Robert L. Behnken, Mike Foreman, Takao Doi of the Japan Aerospace Exploration Agency and Rick Linnehan. Endeavour is on the pad in the background. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  6. KSC-08pd0463

    NASA Image and Video Library

    2008-02-23

    KENNEDY SPACE CENTER, FLA. -- The crew for space shuttle Endeavour's STS-123 mission pose for a group portrait following their arrival at NASA Kennedy Space Center's Shuttle Landing Facility. From left are Commander Dominic Gorie; Mission Specialists Takao Doi of the Japan Aerospace Exploration Agency, Garrett Reisman and Rick Linnehan; Pilot Gregory H. Johnson; and Mission Specialists Robert L. Behnken and Mike Foreman. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT. Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett

  7. Optical overview and qualification of the LLCD space terminal

    NASA Astrophysics Data System (ADS)

    DeVoe, C. E.; Pillsbury, A. D.; Khatri, F.; Burnside, J. M.; Raudenbush, A. C.; Petrilli, L. J.; Williams, T.

    2017-11-01

    In October 2013 the Lunar Laser Communications Demonstration (LLCD) made communications history by successfully demonstrating 622 megabits per second laser communication from the moon's orbit to earth. The LLCD consisted of the Lunar Laser Communication Space Terminal (LLST), developed by MIT Lincoln Laboratory, mounted on NASA's Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft and a primary ground terminal located in New Mexico, the Lunar Laser Communications Ground Terminal (LLGT), and two alternate ground terminals. This paper presents the optical layout of the LLST, the approach for testing the optical subsystems, and the results of the optical qualification of the LLST. Also described is the optical test set used to qualify the LLST. The architecture philosophy for the optics was to keep a small, simple optical backend that provided excellent boresighting and high isolation between the optical paths, high quality wavefront on axis, with minimal throughput losses on all paths. The front end large optics consisted of a Cassegrain 107mm telescope with an f/0.7 parabolic primary mirror and a solar window to reduce the thermal load on the telescope and to minimize background light received at the sensors.

  8. Development of Predictive Wake Vortex Transport Model for Terminal Area Wake Vortex Avoidance

    DOT National Transportation Integrated Search

    1976-05-01

    The wake vortex transport program has been expanded to include viscous effects and the influence of initial roll-up, atmospheric turbulence, and wind shear on the persistence and motion of wake vortices in terminal areas. Analysis of wake characteris...

  9. 7 CFR 915.64 - Termination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engaged in the production for market of avocados in the production area: Provided, That termination of... and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE AVOCADOS GROWN IN SOUTH FLORIDA Order... Secretary, produced more than 50 percent of the volume of the avocados produced within the production area...

  10. Modeling of the Terminal Velocities of the Dust Ejected Material by the Impact

    NASA Astrophysics Data System (ADS)

    Rengel, M.; Küppers, M.; Keller, H. U.; Gutiérrez, P.

    We compute the distribution of velocities of the particles ejected by the impact of the projectile released from NASA Deep Impact spacecraft on the nucleus of comet 9P/Tempel 1 on the successive 20 h following the collision. This is performed by the development and use of an ill-conditioned inverse problem approach, whose main ingredients are a set of observations taken by the Narrow Angle Camera (NAC) of OSIRIS onboard the Rosetta spacecraft, and a set of simple models of the expansion of the dust ejecta plume for different velocities. Terminal velocities are derived using a maximum likelihood estimator.

  11. Phase IV: Deploying ESE Pilot Information Programs for State and Local Government in the Northeast, the Education Community and the Commercial Sector

    NASA Technical Reports Server (NTRS)

    Brower, Robert N.

    2004-01-01

    This Summary of Research report is a final report which summarizes significant accomplishments achieved during NASA grant NAG 13-00044 entitled Phase IV: Deploying ESE Pilot Information Programs for State and Local Government in the Northeast, the Education Community and the Commercial Sector , for the period of September 27,2000 through September 26,2004. All activities under this grant have been successfully completed. It has been requested by NASA reviewers that the material contained herein also be considered in $iew of NASA s twelve national priority areas. During the grant period, the nature of the Earth Science Enterprise (ESE) Application Program has been significantly amended (two major restructurings). These amendments have been reviewed at several meetings, including a national gathering held in Washington DC. Additional meetings have occurred with NASA officials at headquarters and at IAGT offices as the newly emerging programs have become defined. The work described herein is considered "cross-cutting", meaning that it has relevancy to several of the national priority areas. The time period covered requires that the twelve national priority areas initially articulated by NASA be considered. (Subsequent NASA revision has eliminated "community growth" as a focus area. It is not clear how this area might be treated in the future NASA organizational structure, but it is noted that the work reported herein includes clear potential for application to the previously defined community growth area, as well as most of the other application areas.) As indicated in the accompanying figure, activity reports throughout this report can be "mapped" to the priority areas.

  12. Installation restoration program. Decision document for soil and groundwater at the storage area at the USMC Subleased Area, Site 3. 144th Fighter Wing, California Air National Guard, Fresno Air Terminal, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    Decision Document for IRP Site No. 3 - Storage Area at the USMC Sublease Area, California Air National Guard, 144th Fighter Wing, Fresno Air Terminal, Fresno, California. This report documents the data, conclusion, and recommendation to support a No Further Remedial Action Planned decision at Site 3 under the IRP.

  13. KSC-2011-4823

    NASA Image and Video Library

    2011-06-23

    CAPE CANAVERAL, Fla. -- NASA's silver Astrovan is parked below Launch Pad 39A at NASA's Kennedy Space Center in Florida after delivering space shuttle Atlantis' STS-135 crew members to the pad to participate in a launch countdown simulation exercise. The Astrovan will return the astronauts to the Operations and Checkout Building at the end of their training. As part of the Terminal Countdown Demonstration Test (TCDT), the crew members are strapped into their seats on Atlantis to practice the steps that will be taken on launch day. Shuttle Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann

  14. KSC-2011-4822

    NASA Image and Video Library

    2011-06-23

    CAPE CANAVERAL, Fla. -- NASA's silver Astrovan is parked below Launch Pad 39A at NASA's Kennedy Space Center in Florida after delivering space shuttle Atlantis' STS-135 crew members to the pad to participate in a launch countdown simulation exercise. The Astrovan will return the astronauts to the Operations and Checkout Building at the end of their training. As part of the Terminal Countdown Demonstration Test (TCDT), the crew members are strapped into their seats on Atlantis to practice the steps that will be taken on launch day. Shuttle Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann

  15. Physics in NASA Exploration

    NASA Technical Reports Server (NTRS)

    O'Callaghan, Fred

    2004-01-01

    The primary focus of the workshop was NASA's new concentration on sending crewed missions to the Moon by 2020, and then on to Mars and beyond. Several speakers, including JPL s Fred O Callaghan and NASA's Mark Lee, broached the problem that there is now a serious reduction of capability to perform experiments in the ISS, or to fly significant mass in microgravity by other means. By 2010, the shuttle fleet will be discontinued and Russian craft will provide the only access to the ISS. O Callaghan stated that the Fundamental Physics budget is being reduced by 70%. LTMPF and LCAP are slated for termination. However, ground-based experiments are continuing to be funded at present, and it will be possible to compete for $80-90 million in new money from the Human Research Initiative (HRI). The new program thrust is for exploration, not fundamental physics. Fundamental, we were told by Lee, does not ring well in Washington these days. Investigators were advised to consider how their work can benefit missions to the Moon and Mars. Work such as that regarding atomic clocks is looked upon with favor, for example, because it is considered important to navigation and planetary GPS. Mark Lee stressed that physicists must convey to NASA senior management that they are able and willing to contribute to the new exploration research programs. The new mentality must be we deliver products, not do research. This program needs to be able to say that it is doing at least 50% exploration-related research. JPL s Ulf Israelsson discussed the implications to OBPR, which will deliver methods and technology to assure human health and performance in extraterrestrial settings. The enterprise will provide advanced life-support systems and technology that are reliable, capable, simpler, less massive, smaller, and energy-efficient, and it may offer other necessary expertise in areas such as low-gravity behavior. Like Dr. Lee, he stated that the focus must be on products, not research. While there is not yet a formal direction, he said, LTMPF and PARCS ISS flight projects are slated to terminate in October 2004. All flight investigations are being returned to ground programs and phased out by the end of FY07. Physics ground programs are intact for now, but to survive we must shift about 50% of research to supporting exploration. Basic research programs in other disciplines are being cancelled. Product lines will support human health, safety and life-support, including countermeasures against radiation and other hazards, as well as advances in time-keeping, navigation and communications technologies. Israelsson said that the new Fundamental Physics for Exploration Roadmap points to how fundamental physics research can and does support exploration. JPL will use the roadmap to argue for support for fundamental physics research under several codes. Nicholas Bigelow of the University of Rochester encouraged attendees not to become discouraged, but rather to embrace the opportunities presented by NASA's new direction.

  16. Low Cost Precision Lander for Lunar Exploration

    NASA Astrophysics Data System (ADS)

    Hoppa, G. V.; Head, J. N.; Gardner, T. G.; Seybold, K. G.

    2004-12-01

    For 60 years the US Defense Department has invested heavily in producing small, low mass, precision-guided vehicles. The technologies matured under these programs include terrain-aided navigation, closed loop terminal guidance algorithms, robust autopilots, high thrust-to-weight propulsion, autonomous mission management software, sensors, and data fusion. These technologies will aid NASA in addressing New Millennium Science and Technology goals as well as the requirements flowing from the Moon to Mars vision articulated in January 2004. Establishing and resupplying a long-term lunar presence will require automated landing precision not yet demonstrated. Precision landing will increase safety and assure mission success. In our lander design, science instruments amount to 10 kg, 16% of the lander vehicle mass. This compares favorably with 7% for Mars Pathfinder and less than 15% for Surveyor. The mission design relies on a cruise stage for navigation and TCMs for the lander's flight to the moon. The landing sequence begins with a solid motor burn to reduce the vehicle speed to 300-450 m/s. At this point the lander is about 2 minutes from touchdown and has 600 to 700 m/s delta-v capability. This allows for about 10 km of vehicle divert during terminal descent. This concept of operations closely mimics missile operational protocol used for decades: the vehicle remains inert, then must execute its mission flawlessly on a moment's notice. The vehicle design uses a propulsion system derived from heritage MDA programs. A redesigned truss provides hard points for landing gear, electronics, power supply, and science instruments. A radar altimeter and a Digital Scene Matching Area Correlator (DSMAC) provide data for the terminal guidance algorithms. This approach leverages the billions of dollars DoD has invested in these technologies, to land useful science payloads precisely on the lunar surface at relatively low cost.

  17. KSC-2011-4604

    NASA Image and Video Library

    2011-06-20

    CAPE CANAVERAL, Fla. -- High above NASA's Kennedy Space Center in Florida, space shuttle Atlantis' crew members get ready to land their T-38 jets at the Shuttle Landing Facility. The astronauts are at Kennedy to participate in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training in preparation for the upcoming STS-135 mission. Atlantis and its crew are targeted to lift off on July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies, logistics and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett

  18. US computer research networks: Current and future

    NASA Technical Reports Server (NTRS)

    Kratochvil, D.; Sood, D.; Verostko, A.

    1989-01-01

    During the last decade, NASA LeRC's Communication Program has conducted a series of telecommunications forecasting studies to project trends and requirements and to identify critical telecommunications technologies that must be developed to meet future requirements. The Government Networks Division of Contel Federal Systems has assisted NASA in these studies, and the current study builds upon these earlier efforts. The current major thrust of the NASA Communications Program is aimed at developing the high risk, advanced, communications satellite and terminal technologies required to significantly increase the capacity of future communications systems. Also, major new technological, economic, and social-political events and trends are now shaping the communications industry of the future. Therefore, a re-examination of future telecommunications needs and requirements is necessary to enable NASA to make management decisions in its Communications Program and to ensure the proper technologies and systems are addressed. This study, through a series of Task Orders, is helping NASA define the likely communication service needs and requirements of the future and thereby ensuring that the most appropriate technology developments are pursued.

  19. Distinct spatiotemporal accumulation of N-truncated and full-length amyloid-β42 in Alzheimer's disease.

    PubMed

    Shinohara, Mitsuru; Koga, Shunsuke; Konno, Takuya; Nix, Jeremy; Shinohara, Motoko; Aoki, Naoya; Das, Pritam; Parisi, Joseph E; Petersen, Ronald C; Rosenberry, Terrone L; Dickson, Dennis W; Bu, Guojun

    2017-12-01

    Accumulation of amyloid-β peptides is a dominant feature in the pathogenesis of Alzheimer's disease; however, it is not clear how individual amyloid-β species accumulate and affect other neuropathological and clinical features in the disease. Thus, we compared the accumulation of N-terminally truncated amyloid-β and full-length amyloid-β, depending on disease stage as well as brain area, and determined how these amyloid-β species respectively correlate with clinicopathological features of Alzheimer's disease. To this end, the amounts of amyloid-β species and other proteins related to amyloid-β metabolism or Alzheimer's disease were quantified by enzyme-linked immunosorbent assays (ELISA) or theoretically calculated in 12 brain regions, including neocortical, limbic and subcortical areas from Alzheimer's disease cases (n = 19), neurologically normal elderly without amyloid-β accumulation (normal ageing, n = 13), and neurologically normal elderly with cortical amyloid-β accumulation (pathological ageing, n = 15). We observed that N-terminally truncated amyloid-β42 and full-length amyloid-β42 accumulations distributed differently across disease stages and brain areas, while N-terminally truncated amyloid-β40 and full-length amyloid-β40 accumulation showed an almost identical distribution pattern. Cortical N-terminally truncated amyloid-β42 accumulation was increased in Alzheimer's disease compared to pathological ageing, whereas cortical full-length amyloid-β42 accumulation was comparable between Alzheimer's disease and pathological ageing. Moreover, N-terminally truncated amyloid-β42 were more likely to accumulate more in specific brain areas, especially some limbic areas, while full-length amyloid-β42 tended to accumulate more in several neocortical areas, including frontal cortices. Immunoprecipitation followed by mass spectrometry analysis showed that several N-terminally truncated amyloid-β42 species, represented by pyroglutamylated amyloid-β11-42, were enriched in these areas, consistent with ELISA results. N-terminally truncated amyloid-β42 accumulation showed significant regional association with BACE1 and neprilysin, but not PSD95 that regionally associated with full-length amyloid-β42 accumulation. Interestingly, accumulations of tau and to a greater extent apolipoprotein E (apoE, encoded by APOE) were more strongly correlated with N-terminally truncated amyloid-β42 accumulation than those of other amyloid-β species across brain areas and disease stages. Consistently, immunohistochemical staining and in vitro binding assays showed that apoE co-localized and bound more strongly with pyroglutamylated amyloid-β11-x fibrils than full-length amyloid-β fibrils. Retrospective review of clinical records showed that accumulation of N-terminally truncated amyloid-β42 in cortical areas was associated with disease onset, duration and cognitive scores. Collectively, N-terminally truncated amyloid-β42 species have spatiotemporal accumulation patterns distinct from full-length amyloid-β42, likely due to different mechanisms governing their accumulations in the brain. These truncated amyloid-β species could play critical roles in the disease by linking other clinicopathological features of Alzheimer's disease. © The Author (2017). Published by Oxford University Press on behalf of the Guarantors of Brain. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  20. 33 CFR 334.450 - Cape Fear River and tributaries at Sunny Point Army Terminal, Brunswick County, N.C.; restricted...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Cape Fear River and tributaries... AND RESTRICTED AREA REGULATIONS § 334.450 Cape Fear River and tributaries at Sunny Point Army Terminal, Brunswick County, N.C.; restricted area. (a) The area. That portion of Cape Fear River due west of the main...

Top