Sample records for nuclear installations excepted

  1. 78 FR 61401 - Entergy Nuclear Operations, Inc.; Big Rock Point; Independent Spent Fuel Storage Installation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-155; 72-43 and NRC-2013-0218] Entergy Nuclear Operations, Inc.; Big Rock Point; Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory... the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI). ADDRESSES: Please refer...

  2. 78 FR 58570 - Environmental Assessment; Entergy Nuclear Operations, Inc., Big Rock Point

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Assessment; Entergy Nuclear Operations, Inc., Big Rock Point AGENCY: Nuclear Regulatory Commission. ACTION... applicant or the licensee), for the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI... Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI). II. Environmental Assessment (EA...

  3. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  4. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  5. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  6. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  7. 46 CFR 38.15-15 - Electrical installations-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...

  8. 76 FR 76327 - Installation of Radiation Alarms for Rooms Housing Neutron Sources

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... NUCLEAR REGULATORY COMMISSION 10 CFR Part 73 [Docket Nos. PRM-73-15; NRC-2011-0251] Installation of Radiation Alarms for Rooms Housing Neutron Sources AGENCY: Nuclear Regulatory Commission. ACTION: Petition for rulemaking; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the...

  9. The radiological exposure of man from radioactivity in the Baltic Sea.

    PubMed

    Nielsen, S P; Bengtson, P; Bojanowsky, R; Hagel, P; Herrmann, J; Ilus, E; Jakobson, E; Motiejunas, S; Panteleev, Y; Skujina, A; Suplinska, M

    1999-09-30

    A radiological assessment has been carried out considering discharges of radioactivity to the Baltic Sea marine environment since 1950. The sources of radioactivity that have been evaluated are atmospheric nuclear-weapons fallout, fallout from the Chernobyl accident in 1986, discharges of radionuclides from Sellafield and La Hague transported into the Baltic Sea, and discharges of radionuclides from nuclear installations located in the Baltic Sea area. Dose rates from man-made radioactivity to individual members of the public (critical groups) have been calculated based on annual intake of seafood and beach occupancy time. The dose rates to individuals from the regions of the Bothnian Sea and Gulf of Finland are predicted to be larger than from any other area in the Baltic Sea due to the pattern of Chernobyl fallout. The dose rates are predicted to have peaked in 1986 at a value of 0.2 mSv year-1. Collective committed doses to members of the public have been calculated based on fishery statistics and predicted concentrations of radionuclides in biota and coastal sediments. The total collective dose from man-made radioactivity in the Baltic Sea is estimated at 2600 manSv, of which approximately two-thirds originate from Chernobyl fallout, approximately one-quarter from atmospheric nuclear-weapons fallout, approximately 8% from European reprocessing facilities, and approximately 0.04% from nuclear installations bordering the Baltic Sea area. An assessment of small-scale dumping of low-level radioactive waste in the Baltic Sea in the 1960s by Sweden and the Soviet Union has showed that doses to man from these activities are negligible. Dose rates and doses from natural radioactivity dominate except for the year 1986 where dose rates to individuals from Chernobyl fallout in some regions of the Baltic Sea approached those from natural radioactivity.

  10. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...

  11. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...

  12. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...

  13. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...

  14. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...

  15. Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trond Bjornard; Philip C. Durst

    2012-05-01

    This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA)more » of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a country’s safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.« less

  16. Continuously improving safety of nuclear installations: An approach to be reinforced after the Fukushima accident

    NASA Astrophysics Data System (ADS)

    Repussard, Jacques; Schwarz, Michel

    2012-05-01

    After the Three Mile Island accident in 1979 and the Chernobyl accident in 1986, the Fukushima accident shows that the probability of a core meltdown accident in an LWR (Light Water Reactor) has been largely underestimated. The consequences of such an accident are unacceptable: except in the case of TMI2 (Three Mile Island 2) large areas around the damaged plants are contaminated for decades and populations have to be relocated for long periods. This article presents the French approach which consists in improving continuously the safety of the Nuclear Power Plants (NPP) on the basis of lessons learned from operating experience and from the progress in R&D (Research and Development). It details the key role played by IRSN (Institut de radioprotection et de sûreté nucléaire), the French TSO (Technical and scientific Safety Organization), and shows how the Fukushima accident contributes to this approach in improving NPP robustness. It concludes on the necessity to keep on networking TSOs, to share knowledge as well as R&D resources, with the ultimate goal of enhancing and harmonizing nuclear safety worldwide.

  17. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  18. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  19. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  20. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  1. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  2. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...) Changes or alterations in the electrical installations of vessels now in service shall be in accordance...

  3. Extra-Territorial Siting of Nuclear Installations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/politicalmore » frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.« less

  4. 16 CFR 460.17 - What installers must tell their customers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...

  5. 16 CFR 460.17 - What installers must tell their customers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...

  6. 16 CFR 460.17 - What installers must tell their customers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...

  7. 16 CFR 460.17 - What installers must tell their customers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...

  8. 16 CFR 460.17 - What installers must tell their customers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...

  9. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  10. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  11. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  12. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  13. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  14. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Departmentmore » of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.« less

  15. Nondestructive Examination for Nuclear Power Plant Cable Aging Management Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glass, Samuel W.; Fifield, Leonard S.

    2016-01-01

    Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. System tests verify cable function under normal loads; however, the concern is over cable performance under exceptional loads associated with design-basis events (DBEs). The cable’s ability to perform safely over the initial 40 year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found inmore » an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program (AMP) to justify cable performance under normal operation as well as accident conditions. This paper addresses various NDE technologies that constitute the essence of an acceptable aging management program.« less

  16. 50 CFR 35.5 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...

  17. 50 CFR 35.5 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...

  18. 50 CFR 35.5 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...

  19. 50 CFR 35.5 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...

  20. 46 CFR 32.35-15 - Installation of air compressors on tank vessels contracted for on or after June 15, 1977-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... June 15, 1977—TB/ALL. No tank vessel, except an oil pollution clean-up vessel, that carries petroleum... compressor intake installed in any of the following cargo areas: (a) A cargo handling room. (b) An enclosed... or ventilation opening to a cargo handling room. (f) Except for tank barges, the cargo deck space...

  1. 46 CFR 32.35-15 - Installation of air compressors on tank vessels contracted for on or after June 15, 1977-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... June 15, 1977—TB/ALL. No tank vessel, except an oil pollution clean-up vessel, that carries petroleum... compressor intake installed in any of the following cargo areas: (a) A cargo handling room. (b) An enclosed... or ventilation opening to a cargo handling room. (f) Except for tank barges, the cargo deck space...

  2. 46 CFR 32.35-15 - Installation of air compressors on tank vessels contracted for on or after June 15, 1977-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... June 15, 1977—TB/ALL. No tank vessel, except an oil pollution clean-up vessel, that carries petroleum... compressor intake installed in any of the following cargo areas: (a) A cargo handling room. (b) An enclosed... or ventilation opening to a cargo handling room. (f) Except for tank barges, the cargo deck space...

  3. 46 CFR 32.35-15 - Installation of air compressors on tank vessels contracted for on or after June 15, 1977-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... June 15, 1977—TB/ALL. No tank vessel, except an oil pollution clean-up vessel, that carries petroleum... compressor intake installed in any of the following cargo areas: (a) A cargo handling room. (b) An enclosed... or ventilation opening to a cargo handling room. (f) Except for tank barges, the cargo deck space...

  4. 46 CFR 32.35-15 - Installation of air compressors on tank vessels contracted for on or after June 15, 1977-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... June 15, 1977—TB/ALL. No tank vessel, except an oil pollution clean-up vessel, that carries petroleum... compressor intake installed in any of the following cargo areas: (a) A cargo handling room. (b) An enclosed... or ventilation opening to a cargo handling room. (f) Except for tank barges, the cargo deck space...

  5. 46 CFR 95.16-60 - System piping installation testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...

  6. 46 CFR 95.16-60 - System piping installation testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...

  7. 46 CFR 95.16-60 - System piping installation testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...

  8. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  9. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  10. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2014-10-01 2014-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  11. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2013-10-01 2013-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...

  12. Analysis respons to the implementation of nuclear installations safety culture using AHP-TOPSIS

    NASA Astrophysics Data System (ADS)

    Situmorang, J.; Kuntoro, I.; Santoso, S.; Subekti, M.; Sunaryo, G. R.

    2018-02-01

    An analysis of responses to the implementation of nuclear installations safety culture has been done using AHP (Analitic Hierarchy Process) - TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution). Safety culture is considered as collective commitments of the decision-making level, management level, and individual level. Thus each level will provide a subjective perspective as an alternative approach to implementation. Furthermore safety culture is considered by the statement of five characteristics which in more detail form consist of 37 attributes, and therefore can be expressed as multi-attribute state. Those characteristics and or attributes will be a criterion and its value is difficult to determine. Those criteria of course, will determine and strongly influence the implementation of the corresponding safety culture. To determine the pattern and magnitude of the influence is done by using a TOPSIS that is based on decision matrix approach and is composed of alternatives and criteria. The weight of each criterion is determined by AHP technique. The data used are data collected through questionnaires at the workshop on safety and health in 2015. .Reliability test of data gives Cronbah Alpha value of 95.5% which according to the criteria is stated reliable. Validity test using bivariate correlation analysis technique between each attribute give Pearson correlation for all attribute is significant at level 0,01. Using confirmatory factor analysis gives Kaise-Meyer-Olkin of sampling Adequacy (KMO) is 0.719 and it is greater than the acceptance criterion 0.5 as well as the 0.000 significance level much smaller than 0.05 and stated that further analysis could be performed. As a result of the analysis it is found that responses from the level of decision maker (second echelon) dominate the best order preference rank to be the best solution in strengthening the nuclear installation safety culture, except for the first characteristics, safety is a clearly recognized value. The rank of preference order is obtained sequentially according to the level of policy maker, management and individual or staff.

  13. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  14. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  15. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  16. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  17. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  18. 14 CFR 23.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... environmental conditions, including the indirect effects of lightning strikes. (2) Any equipment and system does... Equipment General § 23.1309 Equipment, systems, and installations. The requirements of this section, except... requirements of part 23, to any equipment or system as installed in the airplane. This section is a regulation...

  19. 14 CFR 23.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environmental conditions, including the indirect effects of lightning strikes. (2) Any equipment and system does... Equipment General § 23.1309 Equipment, systems, and installations. The requirements of this section, except... requirements of part 23, to any equipment or system as installed in the airplane. This section is a regulation...

  20. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  1. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  2. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  3. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  4. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  5. 27 CFR 53.99 - Sales of installment accounts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2012-04-01 2011-04-01 true Sales of installment... AMMUNITION Special Provisions Applicable to Manufacturers Taxes § 53.99 Sales of installment accounts. (a) In general. Except as provided in paragraph (d) of this section, in case of a sale or other disposition by a...

  6. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  7. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  8. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  9. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  10. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  11. Solid-tumor mortality in the vicinity of uranium cycle facilities and nuclear power plants in Spain.

    PubMed Central

    López-Abente, G; Aragonés, N; Pollán, M

    2001-01-01

    To ascertain solid tumor mortality in towns near Spain's four nuclear power plants and four nuclear fuel facilities from 1975 to 1993, we conducted a mortality study based on 12,245 cancer deaths in 283 towns situated within a 30-km radius of the above installations. As nonexposed areas, we used 275 towns lying within a 50- to 100-km radius of each installation, matched by population size and sociodemographic characteristics (income level, proportion of active population engaged in farming, proportion of unemployed, percentage of illiteracy, and province). Using log-linear models, we examined relative risk for each area and trends in risk with increasing proximity to an installation. The results reveal a pattern of solid-tumor mortality in the vicinity of uranium cycle facilities, basically characterized by excess lung [relative risk (RR) 1.12, 95% confidence interval (CI), 1.02-1.25] and renal cancer mortality (RR 1.37, 95% CI, 1.07-1.76). Besides the effects of natural radiation, these results could well be evincing the influence on public health exerted by the environmental impact of mining. No such well-defined pattern appeared in the vicinity of nuclear power plants. Monitoring of cancer incidence and mortality is recommended in areas surrounding nuclear fuel facilities and nuclear power plants, and more specific studies are called for in areas adjacent to installations that have been fully operational for longer periods. In this regard, it is important to use dosimetric information in all future studies. PMID:11485872

  12. 30 CFR 75.302 - Main mine fans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ventilated by one or more main mine fans. Booster fans shall not be installed underground to assist main mine fans except in anthracite mines. In anthracite mines, booster fans installed in the main air current or...

  13. 30 CFR 75.302 - Main mine fans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ventilated by one or more main mine fans. Booster fans shall not be installed underground to assist main mine fans except in anthracite mines. In anthracite mines, booster fans installed in the main air current or...

  14. 30 CFR 75.302 - Main mine fans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ventilated by one or more main mine fans. Booster fans shall not be installed underground to assist main mine fans except in anthracite mines. In anthracite mines, booster fans installed in the main air current or...

  15. 30 CFR 75.302 - Main mine fans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ventilated by one or more main mine fans. Booster fans shall not be installed underground to assist main mine fans except in anthracite mines. In anthracite mines, booster fans installed in the main air current or...

  16. 30 CFR 75.302 - Main mine fans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ventilated by one or more main mine fans. Booster fans shall not be installed underground to assist main mine fans except in anthracite mines. In anthracite mines, booster fans installed in the main air current or...

  17. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  18. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  19. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  20. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  1. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  2. Double copper sheath multiconductor instrumentation cable is durable and easily installed in high thermal or nuclear radiation area

    NASA Technical Reports Server (NTRS)

    Mc Crae, A. W., Jr.

    1967-01-01

    Multiconductor instrumentation cable in which the conducting wires are routed through two concentric copper tube sheaths, employing a compressed insulator between the conductors and between the inner and outer sheaths, is durable and easily installed in high thermal or nuclear radiation area. The double sheath is a barrier against moisture, abrasion, and vibration.

  3. Childhood leukaemia risks: from unexplained findings near nuclear installations to recommendations for future research.

    PubMed

    Laurier, D; Grosche, B; Auvinen, A; Clavel, J; Cobaleda, C; Dehos, A; Hornhardt, S; Jacob, S; Kaatsch, P; Kosti, O; Kuehni, C; Lightfoot, T; Spycher, B; Van Nieuwenhuyse, A; Wakeford, R; Ziegelberger, G

    2014-09-01

    Recent findings related to childhood leukaemia incidence near nuclear installations have raised questions which can be answered neither by current knowledge on radiation risk nor by other established risk factors. In 2012, a workshop was organised on this topic with two objectives: (a) review of results and discussion of methodological limitations of studies near nuclear installations; (b) identification of directions for future research into the causes and pathogenesis of childhood leukaemia. The workshop gathered 42 participants from different disciplines, extending widely outside of the radiation protection field. Regarding the proximity of nuclear installations, the need for continuous surveillance of childhood leukaemia incidence was highlighted, including a better characterisation of the local population. The creation of collaborative working groups was recommended for consistency in methodologies and the possibility of combining data for future analyses. Regarding the causes of childhood leukaemia, major fields of research were discussed (environmental risk factors, genetics, infections, immunity, stem cells, experimental research). The need for multidisciplinary collaboration in developing research activities was underlined, including the prevalence of potential predisposition markers and investigating further the infectious aetiology hypothesis. Animal studies and genetic/epigenetic approaches appear of great interest. Routes for future research were pointed out.

  4. 26 CFR 48.4216(d)-1 - Sales of installment accounts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 16 2011-04-01 2011-04-01 false Sales of installment accounts. 48.4216(d)-1... Manufacturers Taxes § 48.4216(d)-1 Sales of installment accounts. (a) In general. Except as provided in paragraph (d) of this section, in case of a sale or other disposition by a manufacturer, producer, or...

  5. 26 CFR 48.4216(d)-1 - Sales of installment accounts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Sales of installment accounts. 48.4216(d)-1... Manufacturers Taxes § 48.4216(d)-1 Sales of installment accounts. (a) In general. Except as provided in paragraph (d) of this section, in case of a sale or other disposition by a manufacturer, producer, or...

  6. Automated Installation Verification of COMSOL via LiveLink for MATLAB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crowell, Michael W

    Verifying that a local software installation performs as the developer intends is a potentially time-consuming but necessary step for nuclear safety-related codes. Automating this process not only saves time, but can increase reliability and scope of verification compared to ‘hand’ comparisons. While COMSOL does not include automatic installation verification as many commercial codes do, it does provide tools such as LiveLink™ for MATLAB® and the COMSOL API for use with Java® through which the user can automate the process. Here we present a successful automated verification example of a local COMSOL 5.0 installation for nuclear safety-related calculations at the Oakmore » Ridge National Laboratory’s High Flux Isotope Reactor (HFIR).« less

  7. 26 CFR 15a.453-1 - Installment method reporting for sales of real property and casual sales of personal property.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... general. The term “installment sale” means a disposition of property (except as provided in paragraph (b... in which the disposition occurs. The term “installment sale” includes dispositions from which payment... reporting of contingent payment sales. (ii) Selling price defined. The term “selling price” means the gross...

  8. 26 CFR 15a.453-1 - Installment method reporting for sales of real property and casual sales of personal property.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... general. The term “installment sale” means a disposition of property (except as provided in paragraph (b... in which the disposition occurs. The term “installment sale” includes dispositions from which payment... reporting of contingent payment sales. (ii) Selling price defined. The term “selling price” means the gross...

  9. Use of liquid metals in nuclear and thermonuclear engineering, and in other innovative technologies

    NASA Astrophysics Data System (ADS)

    Rachkov, V. I.; Arnol'dov, M. N.; Efanov, A. D.; Kalyakin, S. G.; Kozlov, F. A.; Loginov, N. I.; Orlov, Yu. I.; Sorokin, A. P.

    2014-05-01

    By now, a good deal of experience has been gained with using liquid metals as coolants in nuclear power installations; extensive knowledge has been gained about the physical, thermophysical, and physicochemical properties of these coolants; and the scientific principles and a set of methods and means for handling liquid metals as coolants for nuclear power installations have been elaborated. Prototype and commercialgrade sodium-cooled NPP power units have been developed, including the BOR-60, BN-350, and BN-600 power units (the Soviet Union); the Rapsodie, Phenix, and Superphenix power units (France), the EBR-II power unit (the United States); and the PFR power unit (the United Kingdom). In Russia, dedicated nuclear power installations have been constructed, including those with a lead-bismuth coolant for nuclear submarines and with sodium-potassium alloy for spacecraft (the Buk and Topol installations), which have no analogs around the world. Liquid metals (primarily lithium and its alloy with lead) hold promise for use in thermonuclear power engineering, where they can serve not only as a coolant, but also as tritium-producing medium. In this article, the physicochemical properties of liquid metal coolants, as well as practical experience gained from using them in nuclear and thermonuclear power engineering and in innovative technologies are considered, and the lines of further research works are formulated. New results obtained from investigations carried out on the Pb-Bi and Pb for the SVBR and BREST fast-neutron reactors (referred to henceforth as fast reactors) and for controlled accelerator systems are described.

  10. 46 CFR 95.17-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-90 Installations... exception of § 95.17-5(a)(2), insofar as is reasonable and practicable. A 6-inch blanket of foam in 5...

  11. 46 CFR 95.17-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-90 Installations... exception of § 95.17-5(a)(2), insofar as is reasonable and practicable. A 6-inch blanket of foam in 5...

  12. Reliability, Maintainability, and Performance Issues in Hydraulic System Design

    DTIC Science & Technology

    1977-06-01

    the piston and control valve, typically between 0.85 and 0.95 for an integrally mounted valve In a practical hardware installation, the actuator ...around the null position due to internal leakage through the piston seal and in the control valve. A newly installed CH-47 swashplate control actuator ...except when the pump is installed in the manu- facturer’s own test

  13. 46 CFR 111.15-25 - Overload and reverse current protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...

  14. 46 CFR 111.15-25 - Overload and reverse current protection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...

  15. 46 CFR 111.15-25 - Overload and reverse current protection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...

  16. 46 CFR 111.15-25 - Overload and reverse current protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...

  17. 46 CFR 111.15-25 - Overload and reverse current protection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...

  18. 42 CFR 75.3 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in § 75.2 and who are not practitioners excepted by the Act. (2) Nuclear Medicine Technologist Standards apply to all individuals who are nuclear medicine technologists as defined in § 75.2, who perform in vivo nuclear medicine procedures, and who are not practitioners excepted by the Act. For purposes...

  19. 42 CFR 75.3 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... in § 75.2 and who are not practitioners excepted by the Act. (2) Nuclear Medicine Technologist Standards apply to all individuals who are nuclear medicine technologists as defined in § 75.2, who perform in vivo nuclear medicine procedures, and who are not practitioners excepted by the Act. For purposes...

  20. 42 CFR 75.3 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in § 75.2 and who are not practitioners excepted by the Act. (2) Nuclear Medicine Technologist Standards apply to all individuals who are nuclear medicine technologists as defined in § 75.2, who perform in vivo nuclear medicine procedures, and who are not practitioners excepted by the Act. For purposes...

  1. 42 CFR 75.3 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in § 75.2 and who are not practitioners excepted by the Act. (2) Nuclear Medicine Technologist Standards apply to all individuals who are nuclear medicine technologists as defined in § 75.2, who perform in vivo nuclear medicine procedures, and who are not practitioners excepted by the Act. For purposes...

  2. 42 CFR 75.3 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in § 75.2 and who are not practitioners excepted by the Act. (2) Nuclear Medicine Technologist Standards apply to all individuals who are nuclear medicine technologists as defined in § 75.2, who perform in vivo nuclear medicine procedures, and who are not practitioners excepted by the Act. For purposes...

  3. 75 FR 43945 - Convention on Supplementary Compensation for Nuclear Damage Contingent Cost Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... emitted by any source of radiation inside a nuclear installation, provided that such application does not... facilities, equipment, fuel, services, technology, or transport of nuclear materials related to any step... DEPARTMENT OF ENERGY Convention on Supplementary Compensation for Nuclear Damage Contingent Cost...

  4. Design considerations in clustering nuclear rocket engines

    NASA Technical Reports Server (NTRS)

    Sager, Paul H.

    1992-01-01

    An initial investigation of the design considerations in clustering nuclear rocket engines for space transfer vehicles has been made. The clustering of both propulsion modules (which include start tanks) and nuclear rocket engines installed directly to a vehicle core tank appears to be feasible. Special provisions to shield opposite run tanks and the opposite side of a core tank - in the case of the boost pump concept - are required; the installation of a circumferential reactor side shield sector appears to provide an effective solution to this problem. While the time response to an engine-out event does not appear to be critical, the gimbal displacement required appears to be important. Since an installation of three engines offers a substantial reduction in gimbal requirements for engine-out and it may be possible to further enhance mission reliability with the greater number of engines, it is recommended that a cluster of four engines be considered.

  5. Design considerations in clustering nuclear rocket engines

    NASA Astrophysics Data System (ADS)

    Sager, Paul H.

    1992-07-01

    An initial investigation of the design considerations in clustering nuclear rocket engines for space transfer vehicles has been made. The clustering of both propulsion modules (which include start tanks) and nuclear rocket engines installed directly to a vehicle core tank appears to be feasible. Special provisions to shield opposite run tanks and the opposite side of a core tank - in the case of the boost pump concept - are required; the installation of a circumferential reactor side shield sector appears to provide an effective solution to this problem. While the time response to an engine-out event does not appear to be critical, the gimbal displacement required appears to be important. Since an installation of three engines offers a substantial reduction in gimbal requirements for engine-out and it may be possible to further enhance mission reliability with the greater number of engines, it is recommended that a cluster of four engines be considered.

  6. 77 FR 34972 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... the Hammond Housing Authority for the purchase and installation of Variable Refrigerant Flow (VRF... project. The exception was granted by HUD on the basis that the relevant manufactured goods (VRF multi...

  7. Data feature: 1996 world nuclear electricity production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-01

    Detailed data on electricity supplied by nuclear power reactors in 1996 are provided. Figures from the International Atomic Energy Agency indicate that a total of 32 countries worldwide were operating 441 nuclear power plants with an installed capacity of 350,411 GWe, and that 36 commercial nuclear power plant units in 14 different countries with an aggregate installed capacity of 27,928 GWe were under construction. Worldwide nuclear generated electricity increased by 3.6% from 1995 to 1996, providing 17.3% of the world`s electricity production. Data for individual countries and regional totals, including generation and consumption data by source, are provided for Westernmore » Europe, Eastern Europe, the Commonwealth of Independent States, the Far East, Canada, and the United States. Other information provided includes 1996 commercial startups, decommissioning, reactor load factors, imports and exports, and gross electricity production.« less

  8. 75 FR 2163 - Constellation Energy; Notice of Docketing of Special Nuclear Material License SNM-2505 Amendment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 72-8; NRC-2010-0011] Constellation Energy; Notice of... Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission. ACTION: Notice of license..., Division of Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards, U.S...

  9. 77 FR 37937 - License Renewal Application for Prairie Island Nuclear Generating Plant Independent Spent Fuel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... Prairie Island Nuclear Generating Plant Independent Spent Fuel Storage Installation AGENCY: Nuclear... INFORMATION CONTACT: Pamela Longmire, Ph.D., Project Manager, Licensing Branch, Division of Spent Fuel Storage... February 29, 2012 (ADAMS Accession number ML12065A073), by Prairie Island Nuclear Generating Plant (PINGP...

  10. 49 CFR 192.327 - Cover.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... State or municipality: (1) Establishes a minimum cover of less than 24 inches (610 millimeters); (2... accepted practices). (f) All pipe installed offshore, except in the Gulf of Mexico and its inlets, under... concrete coating, or protected by an equivalent means. (g) All pipelines installed under water in the Gulf...

  11. 49 CFR 192.327 - Cover.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... State or municipality: (1) Establishes a minimum cover of less than 24 inches (610 millimeters); (2... accepted practices). (f) All pipe installed offshore, except in the Gulf of Mexico and its inlets, under... concrete coating, or protected by an equivalent means. (g) All pipelines installed under water in the Gulf...

  12. 14 CFR 23.1195 - Fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... systems must be installed and compliance shown with the following: (1) Except for combustor, turbine, and tailpipe sections of turbine-engine installations that contain lines or components carrying flammable fluids or gases for which a fire originating in these sections is shown to be controllable, a fire...

  13. 33 CFR 183.110 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... room means the compartment where a permanently installed gasoline or diesel engine is installed... boat is in its static floating position, except engine rooms. Connected means allowing a flow of water in excess of one-quarter ounce per hour from the engine room bilge into any other compartment with a...

  14. The Creation of a French Basic Nuclear Installation - Description of the Regulatory Process - 13293

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahe, Carole; Leroy, Christine

    CEA is a French government-funded technological research organization. It has to build a medium-level waste interim storage facility because the geological repository will not be available until 2025. This interim storage facility, called DIADEM, has to be available in 2017. These wastes are coming from the research facilities for spent fuel reprocessing and the dismantling of the most radioactive parts of nuclear facilities. The CEA handles the waste management by inventorying the needs and updating them regularly. The conception of the facility is mainly based on this inventory. It provides quantity and characteristics of wastes and it gives the productionmore » schedule until 2035. Beyond mass and volume, main characteristics of these radioactive wastes are chemical nature, radioisotopes, radioactivity, radiation dose, the heat emitted, corrosive or explosive gas production, etc. These characteristics provide information to study the repository safety. DIADEM mainly consists of a concrete cell, isolated from the outside, wherein stainless steel welded containers are stored, stacked in a vertical position in the racks. DIADEM is scheduled to store three types of 8 mm-thick, stainless steel cylindrical containers with an outside diameter 498 mm and height from 620 to 2120 mm. DIADEM will be a basic nuclear installation (INB in French) because of overall activity of radioactive substances stored. The creation of a French basic nuclear installation is subject to authorization according to the French law No. 2006-686 of 13 June 2006 on Transparency and Security in the Nuclear Field. The authorization takes into account the technical and financial capacities of the licensee which must allow him to conduct his project in compliance with these interests, especially to cover the costs of decommissioning the installation and conduct remediation work, and to monitor and maintain its location site or, for radioactive waste disposal installations, to cover the definitive shut-down, maintenance and surveillance expenditure. The authorization is issued by a decree adopted upon advice of the French Nuclear Safety Authority and after a public enquiry. In accordance with Decree No. 2007-1557 of November 2, 2007, the application is filed with the ministries responsible for nuclear safety and the Nuclear Safety Authority. It consists of twelve files and four records information. The favorable opinion of the Nuclear Safety Authority on the folder is required to start the public inquiry. Once the public inquiry is completed, the building permit is issued by the prefect. (authors)« less

  15. 77 FR 64834 - Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... automatic fixed deluge water spray system installed over cable trays and open hatches. The deluge... installed over cable trays and open hatches. The deluge suppression system protecting safety- related cable...

  16. 76 FR 40403 - R.E. Ginna Nuclear Power Plant, LLC, R.E. Ginna Nuclear Power Plant, R.E. Ginna Independent Spent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-244; Docket No. 72-67] R.E. Ginna Nuclear Power Plant, LLC, R.E. Ginna Nuclear Power Plant, R.E. Ginna Independent Spent Fuel Storage Installation; Notice of... Facility Operating License No. DPR-18, for the R.E. Ginna Nuclear Power Plant (Ginna), currently held by R...

  17. 46 CFR 25.35-1 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Requirements. (a) Every gasoline engine installed in a motorboat or motor vessel after April 25, 1940, except outboard motors, shall be equipped with an acceptable means of backfire flame control. (b) Installations... Approval Nos. 162.015 or 162.041 or engine air and fuel induction systems bearing basic Approval Nos. 162...

  18. 46 CFR 25.35-1 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Requirements. (a) Every gasoline engine installed in a motorboat or motor vessel after April 25, 1940, except outboard motors, shall be equipped with an acceptable means of backfire flame control. (b) Installations... Approval Nos. 162.015 or 162.041 or engine air and fuel induction systems bearing basic Approval Nos. 162...

  19. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... arrangement. (6) Machinery installation. (7) Electrical installation. (8) Fire control plan. (9) Fuel tanks... 46 Shipping 7 2014-10-01 2014-10-01 false Plans required. 169.305 Section 169.305 Shipping COAST... and Arrangement Plans § 169.305 Plans required. (a) Except as provided in paragraphs (b) and (c) of...

  20. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... arrangement. (6) Machinery installation. (7) Electrical installation. (8) Fire control plan. (9) Fuel tanks... 46 Shipping 7 2012-10-01 2012-10-01 false Plans required. 169.305 Section 169.305 Shipping COAST... and Arrangement Plans § 169.305 Plans required. (a) Except as provided in paragraphs (b) and (c) of...

  1. 14 CFR 23.1327 - Magnetic direction indicator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Magnetic direction indicator. 23.1327... Instruments: Installation § 23.1327 Magnetic direction indicator. (a) Except as provided in paragraph (b) of this section— (1) Each magnetic direction indicator must be installed so that its accuracy is not...

  2. 32 CFR 644.388 - Army military-screening, clearance, preliminary report of excess, except where an E.O. 11954...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Army military-screening, clearance, preliminary report of excess, except where an E.O. 11954 survey has been made. 644.388 Section 644.388 National... excess, except where an E.O. 11954 survey has been made. Upon receipt of a copy of the installation...

  3. The Effect of Flow Swirling on the Safety and Reliability of Nuclear Power Installations of New Generation

    NASA Astrophysics Data System (ADS)

    Mitrofanova, O. V.; Ivlev, O. A.; Urtenov, D. S.

    2018-03-01

    Hydrodynamics and heat exchange in the elements of thermal hydraulic tracts of ship nuclear reactors of the new generation were numerically simulated in this work. Parts of the coolant circuit in the collector and piping systems with geometries that may lead to generation of stable large-scale vortexes, causing a wide range of acoustic oscillations of the coolant, were selected as modeling objects. The purpose of the research is to develop principles of physical and mathematical modeling for scientific substantiation of optimal layout solutions that ensure enhanced operational life of icebreaker’s nuclear power installations of new generation with reactors of integral type.

  4. Alternative Fuels Data Center

    Science.gov Websites

    participating in any of the following activities: Installing a biofuel pump or tank, except property leased from the franchisor; Converting an existing tank or pump for biofuels use; Advertising the sale of biofuels sources if the franchisor does not offer biofuel; Installing or operating an ethanol blender pump, if the

  5. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  6. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  7. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  8. 76 FR 25705 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... the basis that the relevant manufactured goods (through-the-wall air conditioning systems) are not..., PA, for the purchase and installation of through-the-wall air-conditioning units for the Frank... the purchase and installation of a ductless split air conditioning unit at the Colleen Loney Manor...

  9. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  10. 30 CFR 75.523-1 - Deenergization of self-propelled electric face equipment installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...

  11. 75 FR 13295 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Housing Authority for the purchase and installation of an Access Control and Alarm Monitoring system at... Alarm Monitoring system) are not produced in the U.S. in sufficient and reasonably available quantities..., for the purchase and installation of two ductless split systems for the Elevator Modernization and...

  12. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  13. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  14. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  15. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...

  16. 78 FR 59073 - Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... AGENCY: Nuclear Regulatory Commission. ACTION: License amendment application; issuance. SUMMARY: The U.S...: 301-287- 3422; email: [email protected] . For technical questions, contact the individual(s...: Chris Allen, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission...

  17. 40 CFR 75.4 - Compliance dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....e., SO2 or NOX, as applicable): (A) Only if the relative accuracy test audit (RATA) of the high... that all certification tests are completed no later than the following dates (except as provided in... an oil-fired Phase II unit, January 1, 1995, except that installation and certification tests for...

  18. 14 CFR 91.527 - Operating in icing conditions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... installation or to an airspeed, altimeter, rate of climb, or flight attitude instrument system; (2) Snow or ice... climb, or flight attitude instrument system. (c) Except for an airplane that has ice protection... airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may...

  19. Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less

  20. 49 CFR 192.327 - Cover.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... water not more than 200 feet (60 meters) deep, as measured from the mean low tide, must be installed as follows: (1) Except as provided in paragraph (c) of this section, pipe under water less than 12 feet (3.66... under water at least 12 feet (3.66 meters) deep must be installed so that the top of the pipe is below...

  1. Korean standard nuclear plant ex-vessel neutron dosimetry program Ulchin 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duo, J.I.; Chen, J.; Kulesza, J.A.

    2011-07-01

    A comprehensive ex-vessel neutron dosimetry (EVND) surveillance program has been deployed in 16 pressurized water reactors (PWR) in South Korea and EVND dosimetry sets have already been installed and analyzed in Westinghouse reactor designs. In this paper, the unique features of the design, training, and installation in the Korean standard nuclear plant (KSNP) Ulchin Unit 4 are presented. Ulchin Unit 4 Cycle 9 represents the first dosimetry analyzed from the EVND design deployed in KSNP plants: Yonggwang Units 3 through 6 and Ulchin Units 3 through 6. KSNP's cavity configuration precludes a conventional installation from the cavity floor. The solution,more » requiring the installation crew to access the cavity at an elevation of the active core, places a premium on rapid installation due to high area dose rates. Numerous geometrical features warranted the use of a detailed design in true 3D mechanical design software to control interferences. A full-size training mockup maximized the crew ability to correctly install the instrument in minimum time. The analysis of the first dosimetry set shows good agreements between measurement and calculation within the associated uncertainties. A complete EVND system has been successfully designed, installed, and analyzed for a KNSP plant. Current and future EVND analyses will continue supporting the successful operation of PWR units in South Korea. (authors)« less

  2. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  3. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  4. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  5. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  6. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  7. Industrial Hardening: 1982 Technical Status Report.

    DTIC Science & Technology

    1983-05-01

    for nuclear disaster ; establish additional contacts with industry to foster development of emergency preparedness, in general, and nuclear disaster preparedness...versatility for the situation following a nuclear disaster ). Recent governmat installations of such units have been made on an experimental basis...that industry could use to carry on vital functions now, in an emergency situation, and in event of a nuclear disaster . At its simplest, the

  8. 77 FR 11169 - In the Matter of Exelon Corporation; Constellation Energy Group, Inc.; R.E. Ginna Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0192; Docket Nos. 50-244 and 72-67; License No. DPR-18; Docket No. 72-67; General License] In the Matter of Exelon Corporation; Constellation Energy Group, Inc.; R.E. Ginna Nuclear Power Plant, LLC; R.E. Ginna Nuclear Power Plant; R.E. Ginna Independent Spent Fuel Storage Installation; Order Approving...

  9. Ship-Based Nuclear Energy Systems for Accelerating Developing World Socioeconomic Advance

    NASA Astrophysics Data System (ADS)

    Petroski, Robert; Wood, Lowell

    2014-07-01

    Technological, economic, and policy aspects of supplying energy to newly industrializing and developing countries using ship-deployed nuclear energy systems are described. The approach analyzed comprises nuclear installations of up to gigawatt scale deployed within currently mass-produced large ship hulls which are capable of flexibly supplying energy for electricity, water desalination and district heating-&-cooling with low latencies and minimized shoreside capital expenditures. Nuclear energy is uniquely suited for mobile deployment due to its combination of extraordinary energy density and high power density, which enable enormous supplies of energy to be deployed at extremely low marginal costs. Nuclear installations on ships also confer technological advantages by essentially eliminating risk from earthquakes, tsunamis, and floods; taking advantage of assured access to an effectively unlimited amount of cooling water, and involving minimal onshore preparations and commitments. Instances of floating nuclear power stations that have been proposed in the past, some of which are currently being pursued, have generally been based on conventional LWR technology, moreover without flexibility or completeness of power output options. We consider nuclear technology options for their applicability to the unique opportunities and challenges of a marine environment, with special attention given to low-pressure, high thermal margin systems with continuous and assured afterheat dissipation into the ambient seawater. Such systems appear promising for offering an exceptionally high degree of safety while using a maximally simple set of components. We furthermore consider systems tailored to Developing World contexts, which satisfy societal requirements beyond electrification, e.g., flexible sourcing of potable water and HVAC services, servicing time-varying user requirements, and compatibility with the full spectrum of local renewable energy supplies, specifically including those having intermittency characteristics. Consideration is directed to the relative economics of ship-based and land-based nuclear power stations, and the costs of undersea transmission lines and suitable moorings are discussed, as well as station-maintenance expenses. Potential cost savings from reduced seismic engineering, serialized production, and reduction/elimination of site-specific engineering are determined to be likely to enable large floating nuclear energy systems to be deployed at both significantly lower cost and with lower financial risk than comparable land-based systems. Such plants thus appear to be a compelling option for agilely supplying flexible energy-flows to developing regions, especially as they allow major components of the overhead costs and time-delays of large-scale energy systems to be avoided. Finally, the critical set of issues related to appropriately regulating and insuring floating nuclear power plants designed for export is examined. Approaches to ensuring adequate safety and environmental stewardship while properly allocating risks between system owners/operators and host countries of floating nuclear energy systems are discussed, along with possible pathways toward implementation. Robustness of exemplary nuclear energy systems from all forms of misuse, including materials diversion, is noted, thus ensuring suitability for complications-free, non-discriminatory global deployments. Availability of abundant, low-cost nuclear energy which can flexibly satisfy the full spectrum of energy demands of the economies of developing countries will inevitably result in significantly earlier and more environmentally-sound energy intensification of societies enjoying such advantages. This will help spur autocatalytic gains in human well-being and economic development rates similar to those seen in the developed world during the last two-thirds of a century, while avoiding some of the undesirable sideeffects often associated with those gains. Quantitative estimates of these considerations are offered.

  10. Hazards and hazard combinations relevant for the safety of nuclear power plants

    NASA Astrophysics Data System (ADS)

    Decker, Kurt; Brinkman, Hans; Raimond, Emmanuel

    2017-04-01

    The potential of the contemporaneous impact of different, yet causally related, hazardous events and event cascades on nuclear power plants is a major contributor to the overall risk of nuclear installations. In the aftermath of the Fukushima accident, which was caused by a combination of severe ground shaking by an earthquake, an earthquake-triggered tsunami and the disruption of the plants from the electrical grid by a seismically induced landslide, hazard combinations and hazard cascades moved into the focus of nuclear safety research. We therefore developed an exhaustive list of external hazards and hazard combinations which pose potential threats to nuclear installations in the framework of the European project ASAMPSAE (Advanced Safety Assessment: Extended PSA). The project gathers 31 partners from Europe, North Amerika and Japan. The list comprises of exhaustive lists of natural hazards, external man-made hazards, and a cross-correlation matrix of these hazards. The hazard list is regarded comprehensive by including all types of hazards that were previously cited in documents by IAEA, the Western European Nuclear Regulators Association (WENRA), and others. 73 natural hazards and 24 man-made external hazards are included. Natural hazards are grouped into seismotectonic hazards, flooding and hydrological hazards, extreme values of meteorological phenomena, rare meteorological phenomena, biological hazards / infestation, geological hazards, and forest fire / wild fire. The list of external man-made hazards includes industry accidents, military accidents, transportation accidents, pipeline accidents and other man-made external events. The large number of different hazards results in the extremely large number of 5.151 theoretically possible hazard combinations (not considering hazard cascades). In principle all of these combinations are possible to occur by random coincidence except for 82 hazard combinations that - depending on the time scale - are mutually exclusive (e.g., extremely high air temperature and surface ice). Our dataset further provides information on hazard combinations which are more likely to occur than just by random coincidence. 577 correlations between individual hazards are identified by expert opinion and shown in a cross-correlation chart. Combinations discriminate between: (1) causally connected hazards (cause-effect relation) where one hazard (e.g., costal erosion) may be caused by another hazard (e.g., storm surge); or where one hazard (e.g., high wind) is a prerequisite for a correlated hazard (e.g., storm surge). The identified causal links are not commutative. (2) Associated hazards ("contemporary" events) which are probable to occur at the same time due to a common root cause (e.g., a cold front of a meteorological low pressure area which leads to a drop of air pressure, high wind, thunderstorm, lightning, heavy rain and hail). The root cause may not necessarily be regarded as a hazard by itself. The hazard list and the hazard correlation chart may serve as a starting point for the hazard analysis process for nuclear installations in Level 1 PSA as outlined by IAEA (2010), the definition of design basis for nuclear reactors, and the assessment of design extension conditions as required by WENRA-RHWG (2014). It may further be helpful for the identification of hazard combinations and hazard cascades which threaten other critical infrastructure. References: Decker, K. & Brinkman, H., 2017. List of external hazards to be considered in extended PSA. Report No. ASAMPSA_E/WP21/D21.2/2017-41 - IRSN/ PSN-RES/SAG/2017-00011 IAEA, 2010. Development and Application of Level 1 Probabilistic Safety Assessment for Nuclear Power Plants. Safety Guide No. SSG-3, Vienna. http://www-pub.iaea.org/books/ WENRA-RHWG, 2014. WENRA Safety Reference Levels for Existing Reactors. Update in Relation to Lessons Learned from TEPCO Fukushima Dai-Ichi Accident. http://www.wenra.org/publications/

  11. 76 FR 69293 - U.S. Army Installation Management Command; Notice of Issuance of Director's Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0352; Docket No. 40-09083] U.S. Army Installation Management Command; Notice of Issuance of Director's Decision Notice is hereby given that the Director, Office of Federal and State Materials and Environmental Management Programs (FSME) has issued a Director...

  12. KSC-2012-3025

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install one half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. The second half of the fairing stands ready for installation. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  13. Neutron field characterization at the independent spent fuel storage installation of the Trillo nuclear power plant.

    PubMed

    Campo, Xandra; Méndez, Roberto; Embid, Miguel; Ortego, Alberto; Novo, Manuel; Sanz, Javier

    2018-05-01

    Neutron fields inside and outside the independent spent fuel storage installation of Trillo Nuclear Power Plant are characterized exhaustively in terms of neutron spectra and ambient dose equivalent, measured by Bonner sphere system and LB6411 monitor. Measurements are consistent with storage casks and building shield characteristics, and also with casks distribution inside the building. Outer values at least five times lower than dose limit for free access area are found. Measurements with LB6411 and spectrometer are consistent with each other. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. 75 FR 81287 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... Housing Authority for the purchase and installation of through-the-wall air conditioners, floor-mounted... exception was granted by HUD on the basis that the relevant manufactured goods (through-the-wall air conditioners, floor-mounted water closets, and low voltage electrical components) are not produced in the U.S...

  15. Sandia National Laboratories: National Security Missions: Nuclear Weapons:

    Science.gov Websites

    Safety & Security Sandia National Laboratories Exceptional service in the national interest & Figures Programs Nuclear Weapons About Nuclear Weapons Safety & Security Weapons Science & Twitter YouTube Flickr RSS Top Nuclear Weapons About Nuclear Weapons at Sandia Safety & Security

  16. Boronline, a new generation of boron meter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pirat, P.

    2011-07-01

    Rolls-Royce is a global business providing integrated power systems for use on land, at sea and in the air. The Group has a balanced business portfolio with leading market positions - civil aerospace, defence aerospace, marine and energy Rolls-Royce understands the challenges of design, procurement, manufacture, operation and in-service support of nuclear reactor plants, with over 50 years of experience through the Royal Navy submarine programme. Rolls-Royce can therefore offer full product life-cycle management for new civil nuclear installations, as well as support to existing installations, including plant lifetime extensions. Rolls-Royce produced for 40 years, Instrumentation and Control (I andmore » C) systems of and associated services for nuclear reactors in Europe, including 58 French reactors and others situated in the United States and in others countries, such as China. Rolls-Royce equipped in this domain 200 nuclear reactors in 20 countries. Among all of its nuclear systems, Rolls Royce is presenting to the conference its new generation of on-line boron measurement system, so called Boronline. (authors)« less

  17. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  18. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  19. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  20. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  1. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  2. A feasibility assessment of installation, operation and disposal options for nuclear reactor power system concepts for a NASA growth space station

    NASA Technical Reports Server (NTRS)

    Bloomfield, Harvey S.; Heller, Jack A.

    1987-01-01

    A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth space station architecture was conducted to address a variety of installation, operational disposition, and safety issues. A previous NASA sponsored study, which showed the advantages of space station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide the feasibility of each combination.

  3. 10 CFR 51.61 - Environmental report-independent spent fuel storage installation (ISFSI) or monitored retrievable...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2... Control Desk, Director, Office of Nuclear Material Safety and Safeguards, a separate document entitled...

  4. Implementing Stakeholders' Access to Expertise: Experimenting on Nuclear Installations' Safety Cases - 12160

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilli, Ludivine; Charron, Sylvie

    2012-07-01

    In 2009 and 2010, the Institute for Nuclear Safety and Radiation Protection (IRSN) led two pilot actions dealing with nuclear installations' safety cases. One concerned the periodical review of the French 900 MWe nuclear reactors, the other concerned the decommissioning of a workshop located on the site of Areva's La Hague fuel-reprocessing plant site in Northwestern France. The purpose of both these programs was to test ways for IRSN and a small number of stakeholders (Non-Governmental Organizations (NGOs) members, local elected officials, etc.) to engage in technical discussions. The discussions were intended to enable the stakeholders to review future applicationsmore » and provide valuable input. The test cases confirmed there is a definite challenge in successfully opening a meaningful dialogue to discuss technical issues, in particular the fact that most expertise reports were not public and the conflict that exists between the contrary demands of transparency and confidentiality of information. The test case also confirmed there are ways to further improvement of stakeholders' involvement. (authors)« less

  5. Devices and methods for managing noncombustible gasses in nuclear power plants

    DOEpatents

    Marquino, Wayne; Moen, Stephan C; Wachowiak, Richard M; Gels, John L; Diaz-Quiroz, Jesus; Burns, Jr., John C

    2014-12-23

    Systems passively eliminate noncondensable gasses from facilities susceptible to damage from combustion of built-up noncondensable gasses, such as H2 and O2 in nuclear power plants, without the need for external power and/or moving parts. Systems include catalyst plates installed in a lower header of the Passive Containment Cooling System (PCCS) condenser, a catalyst packing member, and/or a catalyst coating on an interior surface of a condensation tube of the PCCS condenser or an annular outlet of the PCCS condenser. Structures may have surfaces or hydrophobic elements that inhibit water formation and promote contact with the noncondensable gas. Noncondensable gasses in a nuclear power plant are eliminated by installing and using the systems individually or in combination. An operating pressure of the PCCS condenser may be increased to facilitate recombination of noncondensable gasses therein.

  6. Devices and methods for managing noncondensable gasses in nuclear power plants

    DOEpatents

    Marquino, Wayne; Moen, Stephan C.; Wachowiak, Richard M.; Gels, John L.; Diaz-Quiroz, Jesus; Burns, Jr., John C.

    2016-11-15

    Systems passively eliminate noncondensable gasses from facilities susceptible to damage from combustion of built-up noncondensable gasses, such as H2 and O2 in nuclear power plants, without the need for external power and/or moving parts. Systems include catalyst plates installed in a lower header of the Passive Containment Cooling System (PCCS) condenser, a catalyst packing member, and/or a catalyst coating on an interior surface of a condensation tube of the PCCS condenser or an annular outlet of the PCCS condenser. Structures may have surfaces or hydrophobic elements that inhibit water formation and promote contact with the noncondensable gas. Noncondensable gasses in a nuclear power plant are eliminated by installing and using the systems individually or in combination. An operating pressure of the PCCS condenser may be increased to facilitate recombination of noncondensable gasses therein.

  7. Program for life extension and preserving existing resources for motor control center components [nuclear plants

    NASA Astrophysics Data System (ADS)

    Sanwarwalla, M. H.; Alsammarae, A. J.

    1995-08-01

    Many nuclear power plants have motor control centers (MCCs) installed in a harsh, radiation only, environment. Procurement of safety-related replacement devices for these MCCs is an economic burden for the stations if these MCCs have become obsolete. Identical replacement components for many MCCs installed in older plants (ITE Gould, Allis-Chalmers, Klockner-Moeller, Cutler-Hammer, etc.) are no longer available. Plants are left with the option of either retrofitting these MCCs or finding ways to extend the qualified lives of the safety-related components to minimize replacement costs. ComEd nuclear station has embarked on a program to minimize the economic burden for the replacement of Klockner-Moeller (K-M) MCC components. This paper discusses the program adopted by this station and its economic benefits to ComEd.

  8. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  9. Empires, Exceptions, and Anglo-Saxons: Race and Rule between the British and Unites States Empires, 1880-1910. Teaching the JAH.

    ERIC Educational Resources Information Center

    OAH Magazine of History, 2002

    2002-01-01

    Summarizes a teaching document that is part of "Teaching the JAH" (Journal of American History) which corresponds to the article, "Empires, Exceptions, and Anglo-Saxons: Race and Rule between the British and Unites States Empires, 1880-1910" (Paul A. Kramer). Provides the Web site address for the complete installment. (CMK)

  10. Status report on the establishment of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) International Monitoring System (IMS) infrasound network

    NASA Astrophysics Data System (ADS)

    Vivas Veloso, J. A.; Christie, D. R.; Campus, P.; Bell, M.; Hoffmann, T. L.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.

    2002-11-01

    The infrasound component of the International Monitoring System (IMS) for Comprehensive Nuclear-Test-Ban Treaty verification aims for global detection and localization of low-frequency sound waves originating from atmospheric nuclear explosions. The infrasound network will consist of 60 array stations, distributed as evenly as possible over the globe to assure at least two-station detection capability for 1-kton explosions at any point on earth. This network will be larger and more sensitive than any other previously operated infrasound network. As of today, 85% of the site surveys for IMS infrasound stations have been completed, 25% of the stations have been installed, and 8% of the installations have been certified and are transmitting high-quality continuous data to the International Data Center in Vienna. By the end of 2002, 20% of the infrasound network is expected to be certified and operating in post-certification mode. This presentation will discuss the current status and progress made in the site survey, installation, and certification programs for IMS infrasound stations. A review will be presented of the challenges and difficulties encountered in these programs, together with practical solutions to these problems.

  11. From the first nuclear power plant to fourth-generation nuclear power installations [on the 60th anniversary of the World's First nuclear power plant

    NASA Astrophysics Data System (ADS)

    Rachkov, V. I.; Kalyakin, S. G.; Kukharchuk, O. F.; Orlov, Yu. I.; Sorokin, A. P.

    2014-05-01

    Successful commissioning in the 1954 of the World's First nuclear power plant constructed at the Institute for Physics and Power Engineering (IPPE) in Obninsk signaled a turn from military programs to peaceful utilization of atomic energy. Up to the decommissioning of this plant, the AM reactor served as one of the main reactor bases on which neutron-physical investigations and investigations in solid state physics were carried out, fuel rods and electricity generating channels were tested, and isotope products were bred. The plant served as a center for training Soviet and foreign specialists on nuclear power plants, the personnel of the Lenin nuclear-powered icebreaker, and others. The IPPE development history is linked with the names of I.V. Kurchatov, A.I. Leipunskii, D.I. Blokhintsev, A.P. Aleksandrov, and E.P. Slavskii. More than 120 projects of various nuclear power installations were developed under the scientific leadership of the IPPE for submarine, terrestrial, and space applications, including two water-cooled power units at the Beloyarsk NPP in Ural, the Bilibino nuclear cogeneration station in Chukotka, crawler-mounted transportable TES-3 power station, the BN-350 reactor in Kazakhstan, and the BN-600 power unit at the Beloyarsk NPP. Owing to efforts taken on implementing the program for developing fast-neutron reactors, Russia occupied leading positions around the world in this field. All this time, IPPE specialists worked on elaborating the principles of energy supertechnologies of the 21st century. New large experimental installations have been put in operation, including the nuclear-laser setup B, the EGP-15 accelerator, the large physical setup BFS, the high-pressure setup SVD-2; scientific, engineering, and technological schools have been established in the field of high- and intermediate-energy nuclear physics, electrostatic accelerators of multicharge ions, plasma processes in thermionic converters and nuclear-pumped lasers, physics of compact nuclear reactors and radiation protection, thermal physics, physical chemistry and technology of liquid metal coolants, and physics of radiation-induced defects, and radiation materials science. The activity of the institute is aimed at solving matters concerned with technological development of large-scale nuclear power engineering on the basis of a closed nuclear fuel cycle with the use of fast-neutron reactors (referred to henceforth as fast reactors), development of innovative nuclear and conventional technologies, and extension of their application fields.

  12. 10 CFR 72.50 - Transfer of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transfer of license. 72.50 Section 72.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... these regulations—to possession of the radioactive materials and the storage installation involved. (c...

  13. (Installation of the Vinca Accelerator)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zucker, A.

    1991-04-22

    I participated in a workshop of the physics with accelerators in Belgrade, Yugoslavia and chaired an advisory committee for the Vinca Accelerator Installation which is currently in progress. Also, I participated in meetings with the Serbian Academy of Sciences and with the Deputy Prime Minister of Serbia concerning the plans and aspirations of the nuclear research center at Vinca.

  14. Project MICAS: a multivendor open-system incremental approach to implementing an integrated enterprise-wide PACS: works in progress

    NASA Astrophysics Data System (ADS)

    Smith, Edward M.; Wright, Jeffrey; Fontaine, Marc T.; Robinson, Arvin E.

    1998-07-01

    The Medical Information, Communication and Archive System (MICAS) is a multi-vendor incremental approach to PACS. MICAS is a multi-modality integrated image management system that incorporates the radiology information system (RIS) and radiology image database (RID) with future 'hooks' to other hospital databases. Even though this approach to PACS is more risky than a single-vendor turn-key approach, it offers significant advantages. The vendors involved in the initial phase of MICAS are IDX Corp., ImageLabs, Inc. and Digital Equipment Corp (DEC). The network architecture operates at 100 MBits per sec except between the modalities and the stackable intelligent switch which is used to segment MICAS by modality. Each modality segment contains the acquisition engine for the modality, a temporary archive and one or more diagnostic workstations. All archived studies are available at all workstations, but there is no permanent archive at this time. At present, the RIS vendor is responsible for study acquisition and workflow as well as maintenance of the temporary archive. Management of study acquisition, workflow and the permanent archive will become the responsibility of the archive vendor when the archive is installed in the second quarter of 1998. The modalities currently interfaced to MICAS are MRI, CT and a Howtek film digitizer with Nuclear Medicine and computed radiography (CR) to be added when the permanent archive is installed. There are six dual-monitor diagnostic workstations which use ImageLabs Shared Vision viewer software located in MRI, CT, Nuclear Medicine, musculoskeletal reading areas and two in Radiology's main reading area. One of the major lessons learned to date is that the permanent archive should have been part of the initial MICAS installation and the archive vendor should have been responsible for image acquisition rather than the RIS vendor. Currently an archive vendor is being selected who will be responsible for the management of the archive plus the HIS/RIS interface, image acquisition, modality work list manager and interfacing to the current DICOM viewer software. The next phase of MICAS will include interfacing ultrasound, locating servers outside of the Radiology LAN to support the distribution of images and reports to the clinical floors and physician offices both within and outside of the University of Rochester Medical Center (URMC) campus and the teaching archive.

  15. 75 FR 880 - Sunshine Act; Notice of Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... County Nuclear Power Plant, Units 1 and 2), LBP-09-10 (Tentative) e. Detroit Edison Co. (Fermi Power Plant Independent Spent Fuel Storage Installation), LBP-09-20 (Aug. 21, 2009), Docket No. 72-72-EA..., Petition for Review of LBP-09-7 (Tentative) g. Tennessee Valley Authority (Bellefonte Nuclear Power Plant...

  16. 10 CFR 72.82 - Inspections and tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Inspections and tests. 72.82 Section 72.82 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... site with a single storage installation the space provided shall be adequate to accommodate a full-time...

  17. Team effort: the nuclear medicine decision making process. Part II.

    PubMed

    Tsuchiyama, S

    1991-06-01

    This two part article examines the nuclear medicine purchase of Baptist Memorial Hospital in Memphis, the largest private hospital in the nation. Part I (May 1991) focused on what their needs were. This concluding installment looks at the committee mechanism itself and the reasoning that went behind their decisions.

  18. 10 CFR 50.60 - Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... lightwater nuclear power reactors for normal operation. 50.60 Section 50.60 Energy NUCLEAR REGULATORY... lightwater nuclear power reactors for normal operation. (a) Except as provided in paragraph (b) of this section, all light-water nuclear power reactors, other than reactor facilities for which the...

  19. 10 CFR 50.60 - Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... lightwater nuclear power reactors for normal operation. 50.60 Section 50.60 Energy NUCLEAR REGULATORY... lightwater nuclear power reactors for normal operation. (a) Except as provided in paragraph (b) of this section, all light-water nuclear power reactors, other than reactor facilities for which the...

  20. Characteristics of acoustic wave from atmospheric nuclear explosions conducted at the USSR Test Sites

    NASA Astrophysics Data System (ADS)

    Sokolova, Inna

    2015-04-01

    Availability of the acoustic wave on the record of microbarograph is one of discriminate signs of atmospheric (surface layer of atmosphere) and contact explosions. Nowadays there is large number of air wave records from chemical explosions recorded by the IMS infrasound stations installed during recent decade. But there is small number of air wave records from nuclear explosions as air and contact nuclear explosions had been conducted since 1945 to 1962, before the Limited Test Ban Treaty was signed in 1963 (the treaty banning nuclear weapon tests in the atmosphere, in outer space and under water) by the Great Britain, USSR and USA. That time there was small number of installed microbarographs. First infrasound stations in the USSR appeared in 1954, and by the moment of the USSR collapse the network consisted of 25 infrasound stations, 3 of which were located on Kazakhstan territory - in Kurchatov (East Kazakhstan), in Borovoye Observatory (North Kazakhstan) and Talgar Observatory (Northern Tien Shan). The microbarograph of Talgar Observatory was installed in 1962 and recorded large number of air nuclear explosions conducted at Semipalatinsk Test Site and Novaya Zemlya Test Site. The epicentral distance to the STS was ~700 km, and to Novaya Zemlya Test Site ~3500 km. The historical analog records of the microbarograph were analyzed on the availability of the acoustic wave. The selected records were digitized, the database of acoustic signals from nuclear explosions was created. In addition, acoustic signals from atmospheric nuclear explosions conducted at the USSR Test Sites were recorded by analogue broadband seismic stations at wide range of epicentral distances, 300-3600 km. These signals coincide well by its form and spectral content with records of microbarographs and can be used for monitoring tasks and discrimination in places where infrasound observations are absent. Nuclear explosions which records contained acoustic wave were from 0.03 to 30 kt yield for the STS, and from 8.3 to 25 Mt yield for Novaya Zemlya Test Site region. The peculiarities of the wave pattern and spectral content of the acoustic wave records, and relation regularities of acoustic wave amplitude and periods with explosion yield and distance were investigated. The created database can be applied in different monitoring tasks, such as infrasound stations calibration, discrimination of nuclear explosions, precision of nuclear explosions parameters, determination of the explosion yield etc.

  1. 10 CFR 150.21 - Transportation of special nuclear material by aircraft.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transportation of special nuclear material by aircraft. 150.21 Section 150.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Transportation of special nuclear material by aircraft. Except as specifically approved by the Commission no...

  2. 10 CFR 150.21 - Transportation of special nuclear material by aircraft.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Transportation of special nuclear material by aircraft. 150.21 Section 150.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Transportation of special nuclear material by aircraft. Except as specifically approved by the Commission no...

  3. 10 CFR 150.21 - Transportation of special nuclear material by aircraft.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Transportation of special nuclear material by aircraft. 150.21 Section 150.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Transportation of special nuclear material by aircraft. Except as specifically approved by the Commission no...

  4. 10 CFR 150.21 - Transportation of special nuclear material by aircraft.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Transportation of special nuclear material by aircraft. 150.21 Section 150.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Transportation of special nuclear material by aircraft. Except as specifically approved by the Commission no...

  5. 10 CFR 150.21 - Transportation of special nuclear material by aircraft.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Transportation of special nuclear material by aircraft. 150.21 Section 150.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXEMPTIONS AND CONTINUED... Transportation of special nuclear material by aircraft. Except as specifically approved by the Commission no...

  6. 7 CFR 1780.15 - Other Federal, State, and local requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and...; and (d) Health and sanitation standards and design and installation standards unless an exception is...

  7. The development of regulatory expectations for computer-based safety systems for the UK nuclear programme

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, P. J.; Westwood, R.N; Mark, R. T.

    2006-07-01

    The Nuclear Installations Inspectorate (NII) of the UK's Health and Safety Executive (HSE) has completed a review of their Safety Assessment Principles (SAPs) for Nuclear Installations recently. During the period of the SAPs review in 2004-2005 the designers of future UK naval reactor plant were optioneering the control and protection systems that might be implemented. Because there was insufficient regulatory guidance available in the naval sector to support this activity the Defence Nuclear Safety Regulator (DNSR) invited the NII to collaborate with the production of a guidance document that provides clarity of regulatory expectations for the production of safety casesmore » for computer based safety systems. A key part of producing regulatory expectations was identifying the relevant extant standards and sector guidance that reflect good practice. The three principal sources of such good practice were: IAEA Safety Guide NS-G-1.1 (Software for Computer Based Systems Important to Safety in Nuclear Power Plants), European Commission consensus document (Common Position of European Nuclear Regulators for the Licensing of Safety Critical Software for Nuclear Reactors) and IEC nuclear sector standards such as IEC60880. A common understanding has been achieved between the NII and DNSR and regulatory guidance developed which will be used by both NII and DNSR in the assessment of computer-based safety systems and in the further development of more detailed joint technical assessment guidance for both regulatory organisations. (authors)« less

  8. 78 FR 14361 - In the Matter of Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Units 1 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... Nuclear Power Plant, Units 1 and 2 (CPNPP), and its Independent Spent Fuel Storage Installation Facility... licensee, acting on behalf of Energy Future Holdings Corporation (EFH), Energy Future Competitive Holdings Company (EFCH), Texas Competitive Electric Holdings Company LLC, and Luminant Holding Company LLC, the...

  9. 77 FR 43506 - DoD Unclassified Controlled Nuclear Information (UCNI)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ... Systems. (i) Information on the layout or design of security and alarm systems at a specific DoD SNM or... information is not observable from a public area. (iii) Performance characteristics of installed systems. (5... 0790-AI64 DoD Unclassified Controlled Nuclear Information (UCNI) AGENCY: Department of Defense. ACTION...

  10. Development of process control capability through the Browns Ferry Integrated Computer System using Reactor Water Clanup System as an example. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, J.; Mowrey, J.

    1995-12-01

    This report describes the design, development and testing of process controls for selected system operations in the Browns Ferry Nuclear Plant (BFNP) Reactor Water Cleanup System (RWCU) using a Computer Simulation Platform which simulates the RWCU System and the BFNP Integrated Computer System (ICS). This system was designed to demonstrate the feasibility of the soft control (video touch screen) of nuclear plant systems through an operator console. The BFNP Integrated Computer System, which has recently. been installed at BFNP Unit 2, was simulated to allow for operator control functions of the modeled RWCU system. The BFNP Unit 2 RWCU systemmore » was simulated using the RELAP5 Thermal/Hydraulic Simulation Model, which provided the steady-state and transient RWCU process variables and simulated the response of the system to control system inputs. Descriptions of the hardware and software developed are also included in this report. The testing and acceptance program and results are also detailed in this report. A discussion of potential installation of an actual RWCU process control system in BFNP Unit 2 is included. Finally, this report contains a section on industry issues associated with installation of process control systems in nuclear power plants.« less

  11. Results from a Field Trial of the Radio Frequency Based Cylinder Accountability and Tracking System at the Global Nuclear Fuel Americas Fuel Fabrication Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fitzgerald, Peter; Laughter, Mark D; Martyn, Rose

    The Cylinder Accountability and Tracking System (CATS) is a tool designed for use by the International Atomic Energy Agency (IAEA) to improve overall inspector efficiency through real-time unattended monitoring of cylinder movements, site specific rules-based event detection, and the capability to integrate many types of monitoring technologies. The system is based on the tracking of cylinder movements using (radio frequency) RF tags, and the collection of data, such as accountability weights, that can be associated with the cylinders. This presentation will cover the installation and evaluation of the CATS at the Global Nuclear Fuels (GNF) fuel fabrication facility in Wilmington,more » NC. This system was installed to evaluate its safeguards applicability, operational durability under operating conditions, and overall performance. An overview of the system design and elements specific to the GNF deployment will be presented along with lessons learned from the installation process and results from the field trial.« less

  12. 32 CFR 770.38 - Entry restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in Puerto Rico § 770.38 Entry restrictions. Except for duly authorized military personnel and... duties, entry upon any U.S. Navy installation or property in Puerto Rico at anytime, by any person for...

  13. 32 CFR 770.38 - Entry restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in Puerto Rico § 770.38 Entry restrictions. Except for duly authorized military personnel and... duties, entry upon any U.S. Navy installation or property in Puerto Rico at anytime, by any person for...

  14. 14 CFR 25.1195 - Fire extinguishing systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... extinguishing systems. (a) Except for combustor, turbine, and tail pipe sections of turbine engine installations that contain lines or components carrying flammable fluids or gases for which it is shown that a fire...

  15. 14 CFR 25.1195 - Fire extinguishing systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... extinguishing systems. (a) Except for combustor, turbine, and tail pipe sections of turbine engine installations that contain lines or components carrying flammable fluids or gases for which it is shown that a fire...

  16. 14 CFR 25.1195 - Fire extinguishing systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... extinguishing systems. (a) Except for combustor, turbine, and tail pipe sections of turbine engine installations that contain lines or components carrying flammable fluids or gases for which it is shown that a fire...

  17. 14 CFR 25.1195 - Fire extinguishing systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... extinguishing systems. (a) Except for combustor, turbine, and tail pipe sections of turbine engine installations that contain lines or components carrying flammable fluids or gases for which it is shown that a fire...

  18. 14 CFR 25.1195 - Fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... extinguishing systems. (a) Except for combustor, turbine, and tail pipe sections of turbine engine installations that contain lines or components carrying flammable fluids or gases for which it is shown that a fire...

  19. 46 CFR 197.332 - PVHO-Decompression chambers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... pressure; (d) Have a means of operating all installed man-way locking devices, except disabled shipping... (m) Have a sound-powered headset or telephone as a backup to the communications system required by...

  20. 75 FR 55342 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... Jacksonville Housing Authority for the purchase and installation of programmable thermostats, compact... manufactured goods (programmable thermostats, CFL bulbs, and ENERGY STAR-qualified ceiling fans) are not...

  1. Studies and research concerning BNFP: computerized nuclear materials control and accounting system development evaluation report, FY 1978

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, J M; Ehinger, M H; Joseph, C

    1978-10-01

    Development work on a computerized system for nuclear materials control and accounting in a nuclear fuel reprocessing plant is described and evaluated. Hardware and software were installed and tested to demonstrate key measurement, measurement control, and accounting requirements at accountability input/output points using natural uranium. The demonstration included a remote data acquisition system which interfaces process and special instrumentation to a cenral processing unit.

  2. 10 CFR 35.55 - Training for an authorized nuclear pharmacist.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Training for an authorized nuclear pharmacist. 35.55... Administrative Requirements § 35.55 Training for an authorized nuclear pharmacist. Except as provided in § 35.57, the licensee shall require the authorized nuclear pharmacist to be a pharmacist who— (a) Is certified...

  3. 10 CFR 35.55 - Training for an authorized nuclear pharmacist.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Training for an authorized nuclear pharmacist. 35.55... Administrative Requirements § 35.55 Training for an authorized nuclear pharmacist. Except as provided in § 35.57, the licensee shall require the authorized nuclear pharmacist to be a pharmacist who— (a) Is certified...

  4. 10 CFR 35.55 - Training for an authorized nuclear pharmacist.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Training for an authorized nuclear pharmacist. 35.55... Administrative Requirements § 35.55 Training for an authorized nuclear pharmacist. Except as provided in § 35.57, the licensee shall require the authorized nuclear pharmacist to be a pharmacist who— (a) Is certified...

  5. 10 CFR 35.55 - Training for an authorized nuclear pharmacist.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Training for an authorized nuclear pharmacist. 35.55... Administrative Requirements § 35.55 Training for an authorized nuclear pharmacist. Except as provided in § 35.57, the licensee shall require the authorized nuclear pharmacist to be a pharmacist who— (a) Is certified...

  6. 10 CFR 110.46 - Conduct resulting in termination of nuclear exports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... EQUIPMENT AND MATERIAL Review of License Applications § 110.46 Conduct resulting in termination of nuclear... technology to the sovereign control of a non-nuclear weapon state, except in connection with an international... 10 Energy 2 2010-01-01 2010-01-01 false Conduct resulting in termination of nuclear exports. 110...

  7. 10 CFR 110.46 - Conduct resulting in termination of nuclear exports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... EQUIPMENT AND MATERIAL Review of License Applications § 110.46 Conduct resulting in termination of nuclear... technology to the sovereign control of a non-nuclear weapon state, except in connection with an international... 10 Energy 2 2011-01-01 2011-01-01 false Conduct resulting in termination of nuclear exports. 110...

  8. 10 CFR 40.11 - Persons using source material under certain Department of Energy and Nuclear Regulatory...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Persons using source material under certain Department of Energy and Nuclear Regulatory Commission contracts. 40.11 Section 40.11 Energy NUCLEAR REGULATORY... certain Department of Energy and Nuclear Regulatory Commission contracts. Except to the extent that...

  9. 10 CFR 40.11 - Persons using source material under certain Department of Energy and Nuclear Regulatory...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Persons using source material under certain Department of Energy and Nuclear Regulatory Commission contracts. 40.11 Section 40.11 Energy NUCLEAR REGULATORY... certain Department of Energy and Nuclear Regulatory Commission contracts. Except to the extent that...

  10. 10 CFR 40.11 - Persons using source material under certain Department of Energy and Nuclear Regulatory...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Persons using source material under certain Department of Energy and Nuclear Regulatory Commission contracts. 40.11 Section 40.11 Energy NUCLEAR REGULATORY... certain Department of Energy and Nuclear Regulatory Commission contracts. Except to the extent that...

  11. 10 CFR 40.11 - Persons using source material under certain Department of Energy and Nuclear Regulatory...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Persons using source material under certain Department of Energy and Nuclear Regulatory Commission contracts. 40.11 Section 40.11 Energy NUCLEAR REGULATORY... certain Department of Energy and Nuclear Regulatory Commission contracts. Except to the extent that...

  12. 10 CFR 40.11 - Persons using source material under certain Department of Energy and Nuclear Regulatory...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Persons using source material under certain Department of Energy and Nuclear Regulatory Commission contracts. 40.11 Section 40.11 Energy NUCLEAR REGULATORY... certain Department of Energy and Nuclear Regulatory Commission contracts. Except to the extent that...

  13. 30 CFR 75.1403-10 - Criteria-Haulage; general.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Warning lights or reflective signs or tapes should be installed along haulage roads at locations of abrupt... pulled by animals. (b) Cars on main haulage roads should not be pushed, except where necessary to push...

  14. 30 CFR 75.1403-10 - Criteria-Haulage; general.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Warning lights or reflective signs or tapes should be installed along haulage roads at locations of abrupt... pulled by animals. (b) Cars on main haulage roads should not be pushed, except where necessary to push...

  15. 30 CFR 75.1403-10 - Criteria-Haulage; general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Warning lights or reflective signs or tapes should be installed along haulage roads at locations of abrupt... pulled by animals. (b) Cars on main haulage roads should not be pushed, except where necessary to push...

  16. 30 CFR 75.1403-10 - Criteria-Haulage; general.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Warning lights or reflective signs or tapes should be installed along haulage roads at locations of abrupt... pulled by animals. (b) Cars on main haulage roads should not be pushed, except where necessary to push...

  17. 30 CFR 75.1403-10 - Criteria-Haulage; general.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Warning lights or reflective signs or tapes should be installed along haulage roads at locations of abrupt... pulled by animals. (b) Cars on main haulage roads should not be pushed, except where necessary to push...

  18. 78 FR 78411 - Consideration of Approval of Transfer of Renewed Facility Operating Licenses, Materials Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... licenses for nuclear power plants and spent fuel storage facilities from the current holder, Constellation... Independent Spent Fuel Storage Installation (ISFSI) Materials License No. SNM-2505; Nine Mile Point Nuclear.... A request for a hearing must be filed by January 15, 2014. Any potential party as defined in Sec. 2...

  19. 10 CFR 72.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... nuclear fission or nuclear transformation. Byproduct material means— (1) Any radioactive material (except... Indian tribe as defined in the Indian Self Determination and Education Assistance Act (Pub. L. 93-638...

  20. Environmental Information Document: L-reactor reactivation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackey, H.E. Jr.

    1982-04-01

    Purpose of this Environmental Information Document is to provide background for assessing environmental impacts associated with the renovation, restartup, and operation of L Reactor at the Savannah River Plant (SRP). SRP is a major US Department of Energy installation for the production of nuclear materials for national defense. The purpose of the restart of L Reactor is to increase the production of nuclear weapons materials, such as plutonium and tritium, to meet projected needs in the nuclear weapons program.

  1. 10 CFR 51.4 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). NRC means the Nuclear Regulatory Commission...

  2. 10 CFR 51.4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). NRC means the Nuclear Regulatory Commission...

  3. Modelling of nuclear power plant decommissioning financing.

    PubMed

    Bemš, J; Knápek, J; Králík, T; Hejhal, M; Kubančák, J; Vašíček, J

    2015-06-01

    Costs related to the decommissioning of nuclear power plants create a significant financial burden for nuclear power plant operators. This article discusses the various methodologies employed by selected European countries for financing of the liabilities related to the nuclear power plant decommissioning. The article also presents methodology of allocation of future decommissioning costs to the running costs of nuclear power plant in the form of fee imposed on each megawatt hour generated. The application of the methodology is presented in the form of a case study on a new nuclear power plant with installed capacity 1000 MW. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  4. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less

  5. Post-installation activities in the Comprehensive Nuclear Test Ban Treaty (CTBT) International Monitoring System (IMS) infrasound network

    NASA Astrophysics Data System (ADS)

    Vivas Veloso, J. A.; Christie, D. R.; Hoffmann, T. L.; Campus, P.; Bell, M.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.; Wu, Sean F.

    2002-11-01

    The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network, to repair faulty equipment, and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network, this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently, 11 of the 60 IMS infrasound stations are transmitting data in the post-installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post-certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post-installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost-efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations, as well as Configuration Management and Network Sustainment.

  6. 47 CFR 2.807 - Statutory exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Carriers transporting radiofrequency devices without trading in them. (b) Radiofrequency devices manufactured solely for export. (c) The manufacture, assembly, or installation of radiofrequency devices for... device shall be operated if it causes harmful interference to radio communications. (d) Radiofrequency...

  7. 75 FR 77650 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... Housing Authority for the purchase and installation of microwave ovens and Ground Fault Circuit... HUD on the basis that the relevant manufactured goods (GFCI outlets and microwave ovens) are not...

  8. 75 FR 48720 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... Housing Authority for the purchase and installation of marmoleum and linoleum floor tiles, dishwashers... manufactured goods (marmoleum and linoleum floor tiles, ADA-compliant dishwashers, GFCI outlets and an Audio...

  9. Medical Image Processing Server applied to Quality Control of Nuclear Medicine.

    NASA Astrophysics Data System (ADS)

    Vergara, C.; Graffigna, J. P.; Marino, E.; Omati, S.; Holleywell, P.

    2016-04-01

    This paper is framed within the area of medical image processing and aims to present the process of installation, configuration and implementation of a processing server of medical images (MIPS) in the Fundación Escuela de Medicina Nuclear located in Mendoza, Argentina (FUESMEN). It has been developed in the Gabinete de Tecnologia Médica (GA.TE.ME), Facultad de Ingeniería-Universidad Nacional de San Juan. MIPS is a software that using the DICOM standard, can receive medical imaging studies of different modalities or viewing stations, then it executes algorithms and finally returns the results to other devices. To achieve the objectives previously mentioned, preliminary tests were conducted in the laboratory. More over, tools were remotely installed in clinical enviroment. The appropiate protocols for setting up and using them in different services were established once defined those suitable algorithms. Finally, it’s important to focus on the implementation and training that is provided in FUESMEN, using nuclear medicine quality control processes. Results on implementation are exposed in this work.

  10. Status of the SPES project, a new tool for fundamental and apply science studies with exotic ion beams at LNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Napoli, D. R., E-mail: napoli@lnl.infn.it; Andrighetto, A.; Antonini, P.

    SPES, a new accelerator facility for both the production of exotic ion beams and radio-pharmaceuticals, is presently being installed at the Laboratori Nazionali di Legnaro in Italy (LNL). The new cyclotron, which will provide high intensity proton beams for the production of the rare isotopes, has been installed and is now in the commissioning phase. We present here the status of the part of the project devoted to the production and acceleration of fission fragments created in the interaction of an intense proton beam on a production target of UCx. The expected SPES radioactive beams intensities, their quality and theirmore » maximum energies (up to 11 MeV/A for A=130) will permit to perform forefront research in nuclear structure and nuclear dynamics far from the stability valley. Another low energy section of the facility is foreseen for new and challenging research, both in the nuclear physics and in the material science frameworks.« less

  11. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...

  12. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...

  13. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...

  14. 75 FR 76653 - Export Control Modernization: Strategic Trade Authorization License Exception

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-09

    ...); nuclear nonproliferation (NP); regional stability (RS); encryption items (EI); crime control (CC) (but not... weapons (CB); nuclear nonproliferation (NP); regional stability (RS); encryption items (EI); crime control...

  15. Cyber security best practices for the nuclear industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Badr, I.

    2012-07-01

    When deploying software based systems, such as, digital instrumentation and controls for the nuclear industry, it is vital to include cyber security assessment as part of architecture and development process. When integrating and delivering software-intensive systems for the nuclear industry, engineering teams should make use of a secure, requirements driven, software development life cycle, ensuring security compliance and optimum return on investment. Reliability protections, data loss prevention, and privacy enforcement provide a strong case for installing strict cyber security policies. (authors)

  16. Seismo-acoustic Signals Recorded at KSIAR, the Infrasound Array Installed at PS31

    NASA Astrophysics Data System (ADS)

    Kim, T. S.; Che, I. Y.; Jeon, J. S.; Chi, H. C.; Kang, I. B.

    2014-12-01

    One of International Monitoring System (IMS)'s primary seismic stations, PS31, called Korea Seismic Research Station (KSRS), was installed around Wonju, Korea in 1970s. It has been operated by US Air Force Technical Applications Center (AFTAC) for more than 40 years. KSRS is composed of 26 seismic sensors including 19 short period, 6 long period and 1 broad band seismometers. The 19 short period sensors were used to build an array with a 10-km aperture while the 6 long period sensors were used for a relatively long period array with a 40-km aperture. After KSRS was certified as an IMS station in 2006 by Comprehensive Nuclear Test Ban Treaty Organization (CTBTO), Korea Institute of Geoscience and Mineral Resources (KIGAM) which is the Korea National Data Center started to take over responsibilities on the operation and maintenance of KSRS from AFTAC. In April of 2014, KIGAM installed an infrasound array, KSIAR, on the existing four short period seismic stations of KSRS, the sites KS05, KS06, KS07 and KS16. The collocated KSIAR changed KSRS from a seismic array into a seismo-acoustic array. The aperture of KSIAR is 3.3 km. KSIAR also has a 100-m small aperture infrasound array at KS07. The infrasound data from KSIAR except that from the site KS06 is being transmitted in real time to KIGAM with VPN and internet line. An initial analysis on seismo-acoustic signals originated from local and regional distance ranges has been performed since May 2014. The analysis with the utilization of an array process called Progressive Multi-Channel Correlation (PMCC) detected seismo-acoustic signals caused by various sources including small explosions in relation to constructing local tunnels and roads. Some of them were not found in the list of automatic bulletin of KIGAM. The seismo-acoustic signals recorded by KSIAR are supplying a useful information for discriminating local and regional man-made events from natural events.

  17. The influence of EI-21 redox ion-exchange resins on the secondary-coolant circuit water chemistry of vehicular nuclear power installations

    NASA Astrophysics Data System (ADS)

    Moskvin, L. N.; Rakov, V. T.

    2015-06-01

    The results obtained from testing the secondary-coolant circuit water chemistry of full-scale land-based prototype bench models of vehicular nuclear power installations equipped with water-cooled water-moderated and liquid-metal reactor plants are presented. The influence of copper-containing redox ionexchange resins intended for chemically deoxygenating steam condensate on the working fluid circulation loop's water chemistry is determined. The influence of redox ion-exchange resins on the water chemistry is evaluated by generalizing an array of data obtained in the course of extended monitoring using the methods relating to physicochemical analysis of the quality of condensate-feedwater path media and the methods relating to metallographic analysis of the state of a faulty steam generator's tube system surfaces. The deoxygenating effectiveness of the normal state turbine condensate vacuum deaeration system is experimentally determined. The refusal from applying redox ion-exchange resins in the condensate polishing ion-exchange filters is formulated based on the obtained data on the adverse effect of copper-containing redox ionexchange resins on the condensate-feedwater path water chemistry and based on the data testifying a sufficient effect from using the normal state turbine condensate vacuum deaeration system. Data on long-term operation of the prototype bench model of a vehicular nuclear power installation without subjecting the turbine condensate to chemical deoxygenation are presented.

  18. Nuclear power generation and fuel cycle report 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    Nuclear power is an important source of electric energy and the amount of nuclear-generated electricity continued to grow as the performance of nuclear power plants improved. In 1996, nuclear power plants supplied 23 percent of the electricity production for countries with nuclear units, and 17 percent of the total electricity generated worldwide. However, the likelihood of nuclear power assuming a much larger role or even retaining its current share of electricity generation production is uncertain. The industry faces a complex set of issues including economic competitiveness, social acceptance, and the handling of nuclear waste, all of which contribute to themore » uncertain future of nuclear power. Nevertheless, for some countries the installed nuclear generating capacity is projected to continue to grow. Insufficient indigenous energy resources and concerns over energy independence make nuclear electric generation a viable option, especially for the countries of the Far East.« less

  19. Geographical variation in mortality from leukaemia and other cancers in England and Wales in relation to proximity to nuclear installations, 1969-78.

    PubMed Central

    Cook-Mozaffari, P. J.; Darby, S. C.; Doll, R.; Forman, D.; Hermon, C.; Pike, M. C.; Vincent, T.

    1989-01-01

    The distribution of mortality from 11 causes of death (lymphoid leukaemia, other leukaemia, leukaemia of all types, Hodgkin's disease, other lymphomas, all lymphomas, multiple myeloma, lung cancer, other malignancies, all malignancies and all other causes) has been examined in three age groups throughout England and Wales over the period 1969-78. The reorganisation of local authority administration in 1974 meant that the smallest areas that could be examined were 400 county districts or (in some cases) approximate county districts formed by aggregating pre-1974 local authority areas. The variation in the numbers of deaths observed about the numbers expected was assessed using log-linear models to estimate the effect on the relative risk in each district associated with social class, rural status, population size, health authority region and proximity to one of 15 nuclear installations. Trends in risk with increasing proximity to an installation (as judged by the proportion of the population resident within 10 miles) were examined after adjustment for the other four variables. The results showed that in districts near to an installation there were significant excess mortalities in persons under 25 years of age from leukaemia (RR = 1.15, P = 0.01) and especially from lymphoid leukaemia (RR 1.21, P = 0.01) and from Hodgkin's disease (RR 1.24, P = 0.05) and a significant deficiency of mortality from lymphoid leukaemia in persons aged 25-64 years. No significant trends were observed with an increasing proportion of the population near to the installations and the greatest excess mortality from lymphoid leukaemia in young persons was observed in the districts with the intermediate proportion of the population (10.0-65.9%) near an installation. PMID:2930718

  20. 10 CFR 26.207 - Waivers and exceptions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Waivers and exceptions. 26.207 Section 26.207 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Managing Fatigue § 26.207 Waivers and exceptions. (a) Waivers. Licensees may grant a waiver of one or more of the work hour controls in § 26.205(d)(1...

  1. 10 CFR 26.207 - Waivers and exceptions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Waivers and exceptions. 26.207 Section 26.207 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Managing Fatigue § 26.207 Waivers and exceptions. (a) Waivers. Licensees may grant a waiver of one or more of the work hour controls in § 26.205(d)(1...

  2. 10 CFR 26.207 - Waivers and exceptions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Waivers and exceptions. 26.207 Section 26.207 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Managing Fatigue § 26.207 Waivers and exceptions. (a) Waivers. Licensees may grant a waiver of one or more of the work hour controls in § 26.205(d)(1...

  3. 10 CFR 26.207 - Waivers and exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Waivers and exceptions. 26.207 Section 26.207 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Managing Fatigue § 26.207 Waivers and exceptions. (a) Waivers. Licensees may grant a waiver of the work hour controls in § 26.205(d)(1) through (d)(5...

  4. 10 CFR 26.207 - Waivers and exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Waivers and exceptions. 26.207 Section 26.207 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Managing Fatigue § 26.207 Waivers and exceptions. (a) Waivers. Licensees may grant a waiver of the work hour controls in § 26.205(d)(1) through (d)(5...

  5. 78 FR 44603 - Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2; Exelon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... rule, the participant must file the document using the NRC's online, Web-based submission form. In... form, including the installation of the Web browser plug-in, is available on the NRC's public Web site... 61010, and near Braidwood at the Fossil Ridge (Braidwood) Public Library, 386 W. Kennedy Road, Braidwood...

  6. 77 FR 41811 - In the Matter of Tennessee Valley Authority Watts Bar Nuclear Plant EA-12-021; Confirmatory Order...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... expectations will be reinforced through the use of fleet wide posters and communications. Communications will.... Posters will be installed on or before October 1, 2012. c. TVA will revise the existing Nuclear Power... August 1, 2012. b. These expectations will be reinforced through the use of fleet wide posters and...

  7. Bubblers Speed Nuclear Waste Processing at SRS

    ScienceCinema

    None

    2018-05-23

    At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soubies, B.; Henry, J.Y.; Le Meur, M.

    1300 MWe pressurised water reactors (PWRs), like the 1400 MWe reactors, operate with microprocessor-based safety systems. This is particularly the case for the Digital Integrated Protection System (SPIN), which trips the reactor in an emergency and sets in action the safeguard functions. The softwares used in these systems must therefore be highly dependable in the execution of their functions. In the case of SPIN, three players are working at different levels to achieve this goal: the protection system manufacturer, Merlin Gerin; the designer of the nuclear steam supply system, Framatome; the operator of the nuclear power plants, Electricite de Francemore » (EDF), which is also responsible for the safety of its installations. Regulatory licenses are issued by the French safety authority, the Nuclear Installations Safety Directorate (French abbreviation DSIN), subsequent to a successful examination of the technical provisions adopted by the operator. This examination is carried out by the IPSN and the standing group on nuclear reactors. This communication sets out: the methods used by the manufacturer to develop SPIN software for the 1400 MWe PWRs (N4 series); the approach adopted by the IPSN to evaluate the safety software of the protection system for the N4 series of reactors.« less

  9. Design of a New Acceleration System for High-Current Pulsed Proton Beams from an ECR Source

    NASA Astrophysics Data System (ADS)

    Cooper, Andrew L.; Pogrebnyak, Ivan; Surbrook, Jason T.; Kelly, Keegan J.; Carlin, Bret P.; Champagne, Arthur E.; Clegg, Thomas B.

    2014-03-01

    A primary objective for accelerators at TUNL's Laboratory for Experimental Nuclear Astrophysics (LENA) is to maximize target beam intensity to ensure a high rate of nuclear events during each experiment. Average proton target currents of several mA are needed from LENA's electron cyclotron resonance (ECR) ion source because nuclear cross sections decrease substantially at energies of interest <200 keV. We seek to suppress undesired continuous environmental background by pulsing the beam and detecting events only during beam pulses. To improve beam intensity and transport, we installed a more powerful, stable microwave system for the ECR plasma, and will install a new acceleration system. This system will: reduce defocusing effects of the beam's internal space charge; provide better vacuum with a high gas conductance accelerating column; suppress bremsstrahlung X-rays produced when backstreaming electrons strike internal acceleration tube structures; and provide better heat dissipation by using deionized water to provide the current drain needed to establish the accelerating tube's voltage gradient. Details of beam optical modeling calculations, proposed accelerating tube design, and initial beam pulsing tests will be described. Work supported in part by USDOE Office of HE and Nuclear Physics.

  10. Power quality considerations for nuclear spectroscopy applications: Grounding

    NASA Astrophysics Data System (ADS)

    García-Hernández, J. M.; Ramírez-Jiménez, F. J.; Mondragón-Contreras, L.; López-Callejas, R.; Torres-Bribiesca, M. A.; Peña-Eguiluz, R.

    2013-11-01

    Traditionally the electrical installations are designed for supplying power and to assure the personnel safety. In nuclear analysis laboratories, additional issues about grounding also must be considered for proper operation of high resolution nuclear spectroscopy systems. This paper shows the traditional ways of grounding nuclear spectroscopy systems and through different scenarios, it shows the effects on the more sensitive parameter of these systems: the energy resolution, it also proposes the constant monitoring of a power quality parameter as a way to preserve or to improve the resolution of the systems, avoiding the influence of excessive extrinsic noise.

  11. The RIB facility EXOTIC and its experimental program at INFN-LNL

    NASA Astrophysics Data System (ADS)

    Parascandolo, Concetta

    2018-05-01

    In this contribution, I will present a review about the EXOTIC facility and the research field accessible by using its Radioactive Ion Beams. The EXOTIC facility, installed at the INFN-Laboratori Nazionali di Legnaro, is devoted to the in-flight production of light Radioactive Ion Beams in the energy range between 3-5 MeV/nucleon. The scientific activity performed at EXOTIC concerns different aspects of nuclear physics and nuclear astrophysics, such as, the investigation of reaction mechanisms and nuclear structure, resonant scattering experiments and measurements of nuclear reaction cross sections of astrophysical interest.

  12. 10 CFR 50.55a - Codes and standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specified in § 50.55, except that each combined license for a boiling or pressurized water-cooled nuclear... boiling or pressurized water-cooled nuclear power facility is subject to the conditions in paragraphs (f... performed. (2) Systems and components of boiling and pressurized water-cooled nuclear power reactors must...

  13. 32 CFR 552.213 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... military installation under the exclusive federal jurisdiction at which official business of the federal..., and other official business. (b) On Aberdeen Proving Ground, except for activities authorized under 5... training, formation, ceremony, class, court-martial, hearing, or other military business. (3) Obstruct...

  14. 32 CFR 552.213 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... military installation under the exclusive federal jurisdiction at which official business of the federal..., and other official business. (b) On Aberdeen Proving Ground, except for activities authorized under 5... training, formation, ceremony, class, court-martial, hearing, or other military business. (3) Obstruct...

  15. 32 CFR 552.213 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... military installation under the exclusive federal jurisdiction at which official business of the federal..., and other official business. (b) On Aberdeen Proving Ground, except for activities authorized under 5... training, formation, ceremony, class, court-martial, hearing, or other military business. (3) Obstruct...

  16. 32 CFR 552.213 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... military installation under the exclusive federal jurisdiction at which official business of the federal..., and other official business. (b) On Aberdeen Proving Ground, except for activities authorized under 5... training, formation, ceremony, class, court-martial, hearing, or other military business. (3) Obstruct...

  17. 32 CFR 552.213 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... military installation under the exclusive federal jurisdiction at which official business of the federal..., and other official business. (b) On Aberdeen Proving Ground, except for activities authorized under 5... training, formation, ceremony, class, court-martial, hearing, or other military business. (3) Obstruct...

  18. 24 CFR 232.11 - Establishment and maintenance of long-term debt service reserve account.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... this part, and except with respect to Supplemental Loans to Finance Purchase and Installation of Fire Safety Equipment (subpart C of this part), if HUD determines the mortgage presents an atypical long-term...

  19. 24 CFR 232.11 - Establishment and maintenance of long-term debt service reserve account.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... this part, and except with respect to Supplemental Loans to Finance Purchase and Installation of Fire Safety Equipment (subpart C of this part), if HUD determines the mortgage presents an atypical long-term...

  20. 75 FR 54899 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... County Housing Authority, in White Hall, IL, for the purchase and installation of 50-amp range... manufactured goods (50-amp range receptacles and thermostats for the conversion from gas to electric...

  1. 76 FR 37140 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Housing Authority of Medford, MA for the purchase and installation of side- opening, Uniform Federal... CFRFC grant funds, based on the fact that the relevant manufactured goods (side-opening, UFAS-compliant...

  2. 75 FR 63501 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Cambridge Housing Authority for the purchase and installation of energy efficient bathroom exhaust fans and... manufactured goods (energy efficient bathroom exhaust fans and linoleum flooring) are not produced in the U.S...

  3. 75 FR 60776 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Cambridge Housing Authority for the purchase and installation of energy efficient bathroom exhaust fans for... that the relevant manufactured goods, energy efficient bathroom exhaust fans, are not produced in the U...

  4. 76 FR 52678 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... Housing Authority for the purchase and installation of ductless split air conditioning systems for its... manufactured goods (ductless split air conditioning systems) are not produced in the U.S. in sufficient and...

  5. 26 CFR 1.6655-2 - Annualized income installment method.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 50 3rd 75 4th 100 (2) Partial month. Except as otherwise provided, for purposes of paragraph (b) of this section a partial month is treated as a month. (3) Annualization period not a short taxable year...

  6. A feasibility assessment of nuclear reactor power system concepts for the NASA Growth Space Station

    NASA Technical Reports Server (NTRS)

    Bloomfield, H. S.; Heller, J. A.

    1986-01-01

    A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth Space Station architecture was conducted to address a variety of installation, operational, disposition and safety issues. A previous NASA sponsored study, which showed the advantages of Space Station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide a feasibility of each combination.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenie, Koen; Mulier, Guido; Vandorpe, Marc

    Safe decontamination is a regular requirement in the lifecycle of a nuclear plant and is integral to the careful maintenance of any nuclear installation for 4 key reasons: - To decrease the risk of radioactive contamination spreading; - To limit the radioactive doses contracted by maintenance personnel; - To limit the radioactive doses incurred during decommissioning; - To downgrade the class of radioactive waste The primary goal of decommissioning is to remove aged and/or contaminated and/or activated components of an installation, safely and securely, in as short a time as possible. There are several reasons why this may be necessary:more » - To eliminate the risk of radioactive contamination spreading; - To eliminate the risk of radiation; - To downgrade a site or a circuit to a point where it no longer is submitted to regular inspection; - To remove installations or parts that are no longer in service or have aged There are many different D and D techniques, tools and materials available today. What is important is knowing how best to use them. This paper describes the experiences and the future projects of Tecnubel in D and D projects in Belgium and abroad. (authors)« less

  8. Studies of the generation mechanisms of steady vortex formations in the channels of nuclear-power installations for purposes of improving the reliability and safety of their work

    NASA Astrophysics Data System (ADS)

    Mitrofanova, O.

    2017-01-01

    The analysis of the results of experimental researches on revealing the mechanisms of vortex formation in channels of complex geometry in the neutral and conductive media is carried out. The directions of researches related to the study of mechanisms of vortex generation and accumulation of energy by large-scale vortex structures are considered for the possibility of predictions of the man-made accidents and catastrophic natural phenomena. The main goal of ongoing investigations is the solution of the task aimed at improving the safety of nuclear power installations and, in particular, of the fast neutron reactors with liquid-metal coolants, and the prevention of emergency modes arising from acoustic, magnetic and hydrodynamic resonance effects.

  9. Defense Infrastructure: DOD Can Improve Its Response to Environmental Exposures on Military Installations

    DTIC Science & Technology

    2012-05-01

    basis, based on what they perceive the health threat to be. The sidebar illustrates DOD’s response to the 2011 Fukushima Daiichi disaster in Japan... disasters or nuclear attacks, to protect installations, facilities, and personnel—including military and civilian personnel, dependents of military and...4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with

  10. Compartmentalization and Functionality of Nuclear Disorder: Intrinsic Disorder and Protein-Protein Interactions in Intra-Nuclear Compartments

    PubMed Central

    Meng, Fanchi; Na, Insung; Kurgan, Lukasz; Uversky, Vladimir N.

    2015-01-01

    The cell nucleus contains a number of membrane-less organelles or intra-nuclear compartments. These compartments are dynamic structures representing liquid-droplet phases which are only slightly denser than the bulk intra-nuclear fluid. They possess different functions, have diverse morphologies, and are typically composed of RNA (or, in some cases, DNA) and proteins. We analyzed 3005 mouse proteins localized in specific intra-nuclear organelles, such as nucleolus, chromatin, Cajal bodies, nuclear speckles, promyelocytic leukemia (PML) nuclear bodies, nuclear lamina, nuclear pores, and perinuclear compartment and compared them with ~29,863 non-nuclear proteins from mouse proteome. Our analysis revealed that intrinsic disorder is enriched in the majority of intra-nuclear compartments, except for the nuclear pore and lamina. These compartments are depleted in proteins that lack disordered domains and enriched in proteins that have multiple disordered domains. Moonlighting proteins found in multiple intra-nuclear compartments are more likely to have multiple disordered domains. Protein-protein interaction networks in the intra-nuclear compartments are denser and include more hubs compared to the non-nuclear proteins. Hubs in the intra-nuclear compartments (except for the nuclear pore) are enriched in disorder compared with non-nuclear hubs and non-nuclear proteins. Therefore, our work provides support to the idea of the functional importance of intrinsic disorder in the cell nucleus and shows that many proteins associated with sub-nuclear organelles in nuclei of mouse cells are enriched in disorder. This high level of disorder in the mouse nuclear proteins defines their ability to serve as very promiscuous binders, possessing both large quantities of potential disorder-based interaction sites and the ability of a single such site to be involved in a large number of interactions. PMID:26712748

  11. Efforts of Uzbekistan to prevent nuclear terrorism and smuggling of radioactive and nuclear materials.

    PubMed

    Petrenko, V D; Karimov, Yu N; Podkovirin, A I; Shipilov, N N; Yuldashev, B S; Fazylov, M I

    2005-01-01

    Uzbekistan is located on the cross-roads from the north--Russia, Western Europe--to the south--Afghanistan, Iran, Iraq and others. The appearance of terrorist organizations urged some Asian countries to make the nuclear weapons, the making the task of stopping the transportation of nuclear materials and technologies from the north (from countries possessing nuclear weapon) to the south (to countries desiring to have weapons and its components) a reality. To resolve this problem, on the main transportation routes, "Yantar" stationary radiation monitors of Russian production were installed, and development and production of monitors of our own make was started. This paper covers these works as well as those on preventing possible terrorist attacks on nuclear objects of Uzbekistan.

  12. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  13. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  14. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  15. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  16. 29 CFR 1926.1414 - Wire rope-selection and installation criteria.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sockets must be attached to the unloaded dead end of the rope only, except that the use of devices specifically designed for dead-ending rope in a wedge socket is permitted. (g) Socketing must be done in the...

  17. 29 CFR 1926.1414 - Wire rope-selection and installation criteria.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sockets must be attached to the unloaded dead end of the rope only, except that the use of devices specifically designed for dead-ending rope in a wedge socket is permitted. (g) Socketing must be done in the...

  18. 29 CFR 1926.1414 - Wire rope-selection and installation criteria.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sockets must be attached to the unloaded dead end of the rope only, except that the use of devices specifically designed for dead-ending rope in a wedge socket is permitted. (g) Socketing must be done in the...

  19. 7 CFR 58.807 - General construction, repair and installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 58.807 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT... sanitary design principles, except where engineering requirements preclude strict adherence to such...

  20. 7 CFR 58.807 - General construction, repair and installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 58.807 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT... sanitary design principles, except where engineering requirements preclude strict adherence to such...

  1. 7 CFR 58.807 - General construction, repair and installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 58.807 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT... sanitary design principles, except where engineering requirements preclude strict adherence to such...

  2. 75 FR 27808 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... Authority of Owensboro for the purchase and installation of tank-less water heaters at Adams Village. FOR... manufactured goods (tank-less water heaters) are not produced in the U.S. in sufficient and reasonably...

  3. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  4. 77 FR 31376 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... Phoenix Housing Department for the purchase and installation of microwave ovens for the Marcos de Niza... the basis that the relevant manufactured goods (microwave ovens) are not produced in the U.S. in...

  5. Nuclear Deterrence in Cyber-ia: Challenges and Controversies

    DTIC Science & Technology

    2016-09-01

    acceptance of possible opponents. In short, the task of managing a nuclear crisis demands clear thinking and good information. But the employment of...economy, and social infrastructure. (Stuxnet was an exceptional, purpose-built destroyer of targeted nuclear facilities.) Failure of deterrence can...lead to historically unprecedented and socially catastrophic damage even in the case of a “limited” nuclear war by Cold War standards. 58 | Air

  6. Automated meteorological data from commercial aircraft via satellite: Present experience and future implications

    NASA Technical Reports Server (NTRS)

    Steinberg, R.

    1978-01-01

    A low-cost communications system to provide meteorological data from commercial aircraft, in neat real-time, on a fully automated basis has been developed. The complete system including the low profile antenna and all installation hardware weighs 34 kg. The prototype system was installed on a B-747 aircraft and provided meteorological data (wind angle and velocity, temperature, altitude and position as a function of time) on a fully automated basis. The results were exceptional. This concept is expected to have important implications for operational meteorology and airline route forecasting.

  7. Multifaceted Modularity: A Key for Stepwise Building of Hierarchical Complexity in Actinide Metal–Organic Frameworks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dolgopolova, Ekaterina A.; Ejegbavwo, Otega A.; Martin, Corey R.

    Growing necessity for efficient nuclear waste management is a driving force for development of alternative architectures towards fundamental understanding of mechanisms involved in actinide integration inside extended structures. In this manuscript, metal-organic frameworks (MOFs) were investigated as a model system for engineering radionuclide containing materials through utilization of unprecedented MOF modularity, which cannot be replicated in any other type of materials. Through the implementation of recent synthetic advances in the MOF field, hierarchical complexity of An-materials were built stepwise, which was only feasible due to preparation of the first examples of actinide-based frameworks with “unsaturated” metal nodes. The first successfulmore » attempts of solid-state metathesis and metal node extension in An-MOFs are reported, and the results of the former approach revealed drastic differences in chemical behavior of extended structures versus molecular species. Successful utilization of MOF modularity also allowed us to structurally characterize the first example of bimetallic An-An nodes. To the best of our knowledge, through combination of solid-state metathesis, guest incorporation, and capping linker installation, we were able to achieve the highest Th wt% in mono- and bi-actinide frameworks with minimal structural density. Overall, combination of a multistep synthetic approach with homogeneous actinide distribution and moderate solvothermal conditions could make MOFs an exceptionally powerful tool to address fundamental questions responsible for chemical behavior of An-based extended structures, and therefore, shed light on possible optimization of nuclear waste administration.« less

  8. Multifaceted Modularity: A Key for Stepwise Building of Hierarchical Complexity in Actinide Metal-Organic Frameworks.

    PubMed

    Dolgopolova, Ekaterina A; Ejegbavwo, Otega A; Martin, Corey R; Smith, Mark D; Setyawan, Wahyu; Karakalos, Stavros G; Henager, Charles H; Zur Loye, Hans-Conrad; Shustova, Natalia B

    2017-11-22

    Growing necessity for efficient nuclear waste management is a driving force for development of alternative architectures toward fundamental understanding of mechanisms involved in actinide (An) integration inside extended structures. In this manuscript, metal-organic frameworks (MOFs) were investigated as a model system for engineering radionuclide containing materials through utilization of unprecedented MOF modularity, which cannot be replicated in any other type of materials. Through the implementation of recent synthetic advances in the MOF field, hierarchical complexity of An-materials was built stepwise, which was only feasible due to preparation of the first examples of actinide-based frameworks with "unsaturated" metal nodes. The first successful attempts of solid-state metathesis and metal node extension in An-MOFs are reported, and the results of the former approach revealed drastic differences in chemical behavior of extended structures versus molecular species. Successful utilization of MOF modularity also allowed us to structurally characterize the first example of bimetallic An-An nodes. To the best of our knowledge, through combination of solid-state metathesis, guest incorporation, and capping linker installation, we were able to achieve the highest Th wt % in mono- and biactinide frameworks with minimal structural density. Overall, the combination of a multistep synthetic approach with homogeneous actinide distribution and moderate solvothermal conditions could make MOFs an exceptionally powerful tool to address fundamental questions responsible for chemical behavior of An-based extended structures and, therefore, shed light on possible optimization of nuclear waste administration.

  9. 26 CFR 1.468A-2T - Treatment of electing taxpayer (temporary).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... plant for the special transfer. A payment may not be made (or deemed made) to a nuclear decommissioning... construction of the nuclear power plant to which the nuclear decommissioning fund relates has commenced. (2) A.... (d) Treatment of distributions—(1) In general. Except as otherwise provided in paragraph (d)(2) of...

  10. 76 FR 24062 - Florida Power and Light Company, St. Lucie, Unit Nos. 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... (d) is again required. Regulatory Guide 5.73, Fatigue Management for Nuclear Power Plant Personnel, endorses the Nuclear Energy Institute (NEI) report NEI 06- 11, revision 1, ``Managing Personnel Fatigue at Nuclear Power Plants,'' with certain clarifications, additions and exceptions. The NRC staff has endorsed...

  11. NUCLEAR POWER INSTALLATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bell, F.R.

    1962-12-01

    An arrangement is described for nuclear power plants including a reactor and at least one heat exchanger having primary and secondary circuits through which are passed heat-conveying fluids. Pressure-resisting walls about the heat exchangers and the reactor are either integral with or rigidly connected to one another. The heat exchangers are arranged so that their casings tend to shield withdrawn control rods from damage by radiation. (R.J.S.)

  12. Vertical nuclear proliferation.

    PubMed

    Sidel, Victor W

    2007-01-01

    All the nuclear-weapon states are working to develop new nuclear-weapon systems and upgrade their existing ones. Although the US Congress has recently blocked further development of small nuclear weapons and earth-penetrating nuclear weapons, the United States is planning a range of new warheads under the Reliable Replacement Warhead programme, and renewing its nuclear weapons infrastructure. The United Kingdom is spending 1 billion pounds sterling on updating the Atomic Weapons Establishment at Aldermaston, and about 20 billion pounds sterling on replacing its Vanguard submarines and maintaining its Trident warhead stockpile. The US has withdrawn from the Anti-Ballistic Missile Treaty and plans to install missile defence systems in Poland and the Czech Republic; Russia threatens to upgrade its nuclear countermeasures. The nuclear-weapon states should comply with their obligations under Article VI of the Non-Proliferation Treaty, as summarised in the 13-point plan agreed at the 2000 NPT Review Conference, and they should negotiate a Nuclear Weapons Convention.

  13. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength andmore » stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation.« less

  14. Feasibility of Nuclear Power on U.S. Military Installations. 2nd Revision

    DTIC Science & Technology

    2011-03-01

    Small Modular Reactor , Military Installation Energy, Energy Assurance 16. SECURITY CLASSIFICATION OF: a. REPORT I b. ABSTRACT U c. THIS PAGE i; 17. LIMITATION OF ABSTRACT SAR 18. NUMBER OF PAGES 98 19a. NAME OF RESPONSIBLE PERSON Knowledge Center/Rhea Stone 19b. TELEPHONE NUMBER (Include area code) 703-824-2110 Standard Form 298 (Rev. 8/98) Prescribed bv ANSI Sid 239.18 Contents Preliminary note: Development and commercial deployment of small modular reactors

  15. Inside NuSTAR Nose Cone

    NASA Image and Video Library

    2012-03-02

    A spacecraft technician is performing closeout work inside the fairing that will be installed around NASA Nuclear Spectroscopic Telescope Array NuSTAR spacecraft in a processing facility at Vandenberg Air Force Base in California.

  16. 49 CFR 236.923 - Task analysis and basic requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... classroom, simulator, computer-based, hands-on, or other formally structured training and testing, except... for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements...) Based on a formal task analysis, identify the installation, maintenance, repair, modification...

  17. 32 CFR 525.3 - Criteria.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AUTHORIZATION REGULATION FOR KWAJALEIN MISSILE RANGE § 525.3 Criteria. (a) General. (1) Entry authorizations may... efficiency, capability or effectiveness of any military installation located within Kwajalein Missile Range... area entirely within the borders of Kwajalein Missile Range is not authorized except when such entry...

  18. 32 CFR 525.3 - Criteria.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AUTHORIZATION REGULATION FOR KWAJALEIN MISSILE RANGE § 525.3 Criteria. (a) General. (1) Entry authorizations may... efficiency, capability or effectiveness of any military installation located within Kwajalein Missile Range... area entirely within the borders of Kwajalein Missile Range is not authorized except when such entry...

  19. 32 CFR 525.3 - Criteria.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AUTHORIZATION REGULATION FOR KWAJALEIN MISSILE RANGE § 525.3 Criteria. (a) General. (1) Entry authorizations may... efficiency, capability or effectiveness of any military installation located within Kwajalein Missile Range... area entirely within the borders of Kwajalein Missile Range is not authorized except when such entry...

  20. 32 CFR 525.3 - Criteria.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AUTHORIZATION REGULATION FOR KWAJALEIN MISSILE RANGE § 525.3 Criteria. (a) General. (1) Entry authorizations may... efficiency, capability or effectiveness of any military installation located within Kwajalein Missile Range... area entirely within the borders of Kwajalein Missile Range is not authorized except when such entry...

  1. 32 CFR 525.3 - Criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AUTHORIZATION REGULATION FOR KWAJALEIN MISSILE RANGE § 525.3 Criteria. (a) General. (1) Entry authorizations may... efficiency, capability or effectiveness of any military installation located within Kwajalein Missile Range... area entirely within the borders of Kwajalein Missile Range is not authorized except when such entry...

  2. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  3. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  4. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  5. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  6. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  7. 76 FR 16017 - Withdrawal of Regulatory Guide 8.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ...) Standard N2.3-1979 ``Immediate Evacuation Signal for Use in Industrial Installations,'' published September... Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2011-6665 Filed 3-21-11...

  8. 317/319 Phytoremediation site monitoring report - 2009 growing season : final report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Negri, C .N.; Benda, P. L.; Gopalakrishnan, G.

    2010-02-10

    In 1999, Argonne National Laboratory (Argonne) designed and installed a series of engineered plantings consisting of a vegetative cover system and approximately 800 hybrid poplars and willows rooting at various predetermined depths. The plants were installed using various methods including Applied Natural Science's TreeWell{reg_sign} system. The goal of the installation was to protect downgradient surface and groundwater by intercepting the contaminated groundwater with the tree roots, removing moisture from the upgradient soil area, reducing water infiltration, preventing soil erosion, degrading and/or transpiring the residual volatile organic compounds (VOCs), and removing tritium from the subsoil and groundwater. This report presents themore » results of the monitoring activities conducted by Argonne's Energy Systems (ES) Division in the growing season of 2009. Monitoring of the planted trees began soon after the trees were installed in 1999 and has been conducted every summer since then. As the trees grew and consolidated their growth into the contaminated soil and groundwater, their exposure to the contaminants was progressively shown through tissue sampling. During the 2009 sampling campaign, VOC concentrations found in the French Drain area were in general consistent with or slightly lower than the 2008 results. Additionally, closely repeated, stand wide analyses showed contaminant fluctuations that may indicate short-term contaminant depletion in the area of interest of roots. This data will be useful to determine short-term removal rate by the trees. As in previous years, levels in the Hydraulic Control Area were close to background levels except for a few exceptions.« less

  9. 75 FR 9956 - PSEG Nuclear LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... letter number LR-N09- 0248 and the second enclosure is an environmental impact statement. Based on a... November 3, and November 20, 2009, submittals, with the exception of the environmental impact statement... M. S. Fertel, Nuclear Energy Institute, ADAMS Accession No. ML091410309). The licensee's request for...

  10. Radiotherapy and Nuclear Medicine Project for an Integral Oncology Center at the Oaxaca High Specialization Regional Hospital

    NASA Astrophysics Data System (ADS)

    De Jesús, M.; Trujillo-Zamudio, F. E.

    2010-12-01

    A building project of Radiotherapy & Nuclear Medicine services (diagnostic and therapy), within an Integral Oncology Center (IOC), requires interdisciplinary participation of architects, biomedical engineers, radiation oncologists and medical physicists. This report focus on the medical physicist role in designing, building and commissioning stages, for the final clinical use of an IOC at the Oaxaca High Specialization Regional Hospital (HRAEO). As a first step, during design stage, the medical physicist participates in discussions about radiation safety and regulatory requirements for the National Regulatory Agency (called CNSNS in Mexico). Medical physicists propose solutions to clinical needs and take decisions about installing medical equipment, in order to fulfill technical and medical requirements. As a second step, during the construction stage, medical physicists keep an eye on building materials and structural specifications. Meanwhile, regulatory documentation must be sent to CNSNS. This documentation compiles information about medical equipment, radioactivity facility, radiation workers and nuclear material data, in order to obtain the license for the linear accelerator, brachytherapy and nuclear medicine facilities. As a final step, after equipment installation, the commissioning stage takes place. As the conclusion, we show that medical physicists are essentials in order to fulfill with Mexican regulatory requirements in medical facilities.

  11. 14 CFR 91.527 - Operating in icing conditions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., windshield, stabilizing or control surface; to a powerplant installation; or to an airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may be made with frost... each rotor blade, propeller, windshield, wing, stabilizing or control surface, and each airspeed...

  12. 14 CFR 91.527 - Operating in icing conditions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., windshield, stabilizing or control surface; to a powerplant installation; or to an airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may be made with frost... each rotor blade, propeller, windshield, wing, stabilizing or control surface, and each airspeed...

  13. 14 CFR 91.527 - Operating in icing conditions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., windshield, stabilizing or control surface; to a powerplant installation; or to an airspeed, altimeter, rate of climb, or flight attitude instrument system or wing, except that takeoffs may be made with frost... each rotor blade, propeller, windshield, wing, stabilizing or control surface, and each airspeed...

  14. 75 FR 59108 - Positive Train Control Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... established. No railroad had supplied data supporting further track exceptions from PTC system installation...-0132, Notice No. 4] RIN 2130-AC03 Positive Train Control Systems AGENCY: Federal Railroad... Control (PTC) systems for railroads as mandated by the Rail Safety Improvement Act of 2008. With...

  15. 32 CFR 1903.10 - Weapons.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Weapons. 1903.10 Section 1903.10 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.10 Weapons. (a) Except as provided in paragraph (c) of this section, knowingly possessing...

  16. 32 CFR 1903.10 - Weapons.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Weapons. 1903.10 Section 1903.10 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.10 Weapons. (a) Except as provided in paragraph (c) of this section, knowingly possessing...

  17. 32 CFR 1903.10 - Weapons.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Weapons. 1903.10 Section 1903.10 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.10 Weapons. (a) Except as provided in paragraph (c) of this section, knowingly possessing...

  18. 32 CFR 1903.10 - Weapons.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Weapons. 1903.10 Section 1903.10 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.10 Weapons. (a) Except as provided in paragraph (c) of this section, knowingly possessing...

  19. 32 CFR 1903.10 - Weapons.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Weapons. 1903.10 Section 1903.10 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.10 Weapons. (a) Except as provided in paragraph (c) of this section, knowingly possessing...

  20. 49 CFR 192.9 - What requirements apply to gathering lines?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... gathering line must comply with requirements of this part applicable to transmission lines, except the... onshore gathering line must comply with the requirements of this part applicable to transmission lines... design, installation, construction, initial inspection, and initial testing must be in accordance with...

  1. 49 CFR 192.9 - What requirements apply to gathering lines?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... gathering line must comply with requirements of this part applicable to transmission lines, except the... onshore gathering line must comply with the requirements of this part applicable to transmission lines... design, installation, construction, initial inspection, and initial testing must be in accordance with...

  2. 49 CFR 192.9 - What requirements apply to gathering lines?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... gathering line must comply with requirements of this part applicable to transmission lines, except the... onshore gathering line must comply with the requirements of this part applicable to transmission lines... design, installation, construction, initial inspection, and initial testing must be in accordance with...

  3. Fermi, Szilard and Trinity

    ERIC Educational Resources Information Center

    Anderson, Herbert L.

    1974-01-01

    The final installment of the author's recollections of his work with physicists Enrico Fermi, Leo Szilard and others in developing the first controlled nuclear chain reaction and in preparing the test explosion of the first atomic bomb. (GS)

  4. Measurement of neutron and charged particle fluxes toward earthquake prediction

    NASA Astrophysics Data System (ADS)

    Maksudov, Asatulla U.; Zufarov, Mars A.

    2017-12-01

    In this paper, we describe a possible method for predicting the earthquakes, which is based on simultaneous recording of the intensity of fluxes of neutrons and charged particles by detectors, commonly used in nuclear physics. These low-energy particles originate from radioactive nuclear processes in the Earth's crust. The variations in the particle flux intensity can be the precursor of the earthquake. A description is given of an electronic installation that records the fluxes of charged particles in the radial direction, which are a possible response to the accumulated tectonic stresses in the Earth's crust. The obtained results showed an increase in the intensity of the fluxes for 10 or more hours before the occurrence of the earthquake. The previous version of the installation was able to indicate for the possibility of an earthquake (Maksudov et al. in Instrum Exp Tech 58:130-131, 2015), but did not give information about the direction of the epicenter location. In this regard, the installation was modified by adding eight directional detectors. With the upgraded setup, we have received both the predictive signals, and signals determining the directions of the location of the forthcoming earthquake, starting 2-3 days before its origin.

  5. Nuclear moisture-density evaluation : part II : final report.

    DOT National Transportation Integrated Search

    1966-06-01

    The determination of in-place density by the use of nuclear moisture-density devices has proven to be an exceptionally useful tool to the modern Highway Engineer. In order to adequately adapt this new testing equipment to efficient field use, evaluat...

  6. Thermal tests of large recirculation cooling installations for nuclear power plants

    NASA Astrophysics Data System (ADS)

    Balunov, B. F.; Lychakov, V. D.; Il'in, V. A.; Shcheglov, A. A.; Maslov, O. P.; Rasskazova, N. A.; Rakhimov, R. Z.; Boyarov, R. A.

    2017-11-01

    The article presents the results from thermal tests of some recirculation installations for cooling air in nuclear power plant premises, including the volume under the containment. The cooling effect in such installations is produced by pumping water through their heat-transfer tubes. Air from the cooled room is blown by a fan through a bundle of transversely finned tubes and is removed to the same room after having been cooled. The finning of tubes used in the tested installations was made of Grade 08Kh18N10T and Grade 08Kh18N10 stainless steels or Grade AD1 aluminum. Steel fins were attached to the tube over their entire length by means of high-frequency welding. Aluminum fins were extruded on a lathe from the external tube sheath into which a steel tube had preliminarily been placed. Although the fin extrusion operation was accompanied by pressing the sheath inner part to the steel tube, tight contact between them over the entire surface was not fully achieved. In view of this, the air gap's thermal resistance coefficient was introduced in calculating the heat transfer between the heat-transferring media. The air gap average thickness was determined from the test results taking into account the gap variation with temperature due to different linear expansion coefficients of steel and aluminum. These tests, which are part of the acceptance tests of the considered installations, were carried out at the NPO TsKTI test facility and were mainly aimed at checking if the obtained thermal characteristics were consistent with the values calculated according to the standard recommendations with introduction, if necessary, of modifications to those recommendations.

  7. Antenna pattern study, task 2

    NASA Technical Reports Server (NTRS)

    Harper, Warren

    1989-01-01

    Two electromagnetic scattering codes, NEC-BSC and ESP3, were delivered and installed on a NASA VAX computer for use by Marshall Space Flight Center antenna design personnel. The existing codes and certain supplementary software were updated, the codes installed on a computer that will be delivered to the customer, to provide capability for graphic display of the data to be computed by the use of the codes and to assist the customer in the solution of specific problems that demonstrate the use of the codes. With the exception of one code revision, all of these tasks were performed.

  8. 15 CFR 740.7 - Computers (APP).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4A003. (2) Technology and software. License Exception APP authorizes exports of technology and software... programmability. (ii) Technology and source code. Technology and source code eligible for License Exception APP..., reexports and transfers (in-country) for nuclear, chemical, biological, or missile end-users and end-uses...

  9. 24 CFR 3280.811 - Calculations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... motors and heater loads (exhaust fans, air conditioners, electric, gas, or oil heating). Omit smaller of air conditioning and heating except include blower motor if used as air conditioner evaporator motor. When an air conditioner is not installed and a 40-ampere power supply cord is provided, allow 15...

  10. 14 CFR 25.1181 - Designated fire zones; regions included.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engines; and (7) Combustor, turbine, and tailpipe sections of turbine engine installations that contain... Protection § 25.1181 Designated fire zones; regions included. (a) Designated fire zones are— (1) The engine power section; (2) The engine accessory section; (3) Except for reciprocating engines, any complete...

  11. 14 CFR 25.1181 - Designated fire zones; regions included.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engines; and (7) Combustor, turbine, and tailpipe sections of turbine engine installations that contain... Protection § 25.1181 Designated fire zones; regions included. (a) Designated fire zones are— (1) The engine power section; (2) The engine accessory section; (3) Except for reciprocating engines, any complete...

  12. 14 CFR 25.1181 - Designated fire zones; regions included.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engines; and (7) Combustor, turbine, and tailpipe sections of turbine engine installations that contain... Protection § 25.1181 Designated fire zones; regions included. (a) Designated fire zones are— (1) The engine power section; (2) The engine accessory section; (3) Except for reciprocating engines, any complete...

  13. 14 CFR 25.1181 - Designated fire zones; regions included.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... engines; and (7) Combustor, turbine, and tailpipe sections of turbine engine installations that contain... Protection § 25.1181 Designated fire zones; regions included. (a) Designated fire zones are— (1) The engine power section; (2) The engine accessory section; (3) Except for reciprocating engines, any complete...

  14. 14 CFR 25.1181 - Designated fire zones; regions included.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engines; and (7) Combustor, turbine, and tailpipe sections of turbine engine installations that contain... Protection § 25.1181 Designated fire zones; regions included. (a) Designated fire zones are— (1) The engine power section; (2) The engine accessory section; (3) Except for reciprocating engines, any complete...

  15. 14 CFR 91.517 - Passenger information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Passenger information. 91.517 Section 91... Multiengine Airplanes and Fractional Ownership Program Aircraft § 91.517 Passenger information. (a) Except as... belts and when smoking is prohibited. (c) If passenger information signs are installed, no passenger or...

  16. 32 CFR 230.4 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... are considered electronic banking services and, as such, shall be provided only by financial... installations: (1) Except where they already may exist as of May 1, 2000, no more than one banking institution... overseas (see paragraph (b)(2)(iii) of this section), only banking institutions insured by the Federal...

  17. 46 CFR 182.458 - Portable fuel systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Portable fuel systems. 182.458 Section 182.458 Shipping...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.458 Portable fuel systems. (a) Portable fuel systems, including portable tanks and related fuel lines and accessories, are prohibited except where used...

  18. 46 CFR 182.458 - Portable fuel systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Portable fuel systems. 182.458 Section 182.458 Shipping...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.458 Portable fuel systems. (a) Portable fuel systems, including portable tanks and related fuel lines and accessories, are prohibited except where used...

  19. 46 CFR 182.458 - Portable fuel systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Portable fuel systems. 182.458 Section 182.458 Shipping...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.458 Portable fuel systems. (a) Portable fuel systems, including portable tanks and related fuel lines and accessories, are prohibited except where used...

  20. France: Thrust and parry over nuclear risks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balter, M.

    1997-01-31

    Claims about the health risks posed by nuclear-power installations are always controversial, but nowhere more so than in France, where some 75% of the nation`s electricity is generated from nuclear energy. So, it was no surprise that publication of a study by two French epidemiologists earlier this month claiming to show a link between cases of childhood leukemia and the nuclear-waste reprocessing plant at La Hague on the Normandy coast sparked fireworks in the French press. Several French epidemiologists sharply criticized the study`s methodology and conclusions. Their attacks have now drawn an unusual response from the British Medical Journal (BMJ),more » in which the paper appeared.« less

  1. 10 CFR 100.4 - Communications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Communications. 100.4 Section 100.4 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.4 Communications. Except where otherwise... Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission...

  2. 10 CFR 100.4 - Communications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Communications. 100.4 Section 100.4 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.4 Communications. Except where otherwise... Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission...

  3. 10 CFR 110.4 - Communications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Communications. 110.4 Section 110.4 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL General Provisions § 110.4 Communications. Except where otherwise specified in this part, all communications and reports...

  4. 10 CFR 110.4 - Communications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Communications. 110.4 Section 110.4 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL General Provisions § 110.4 Communications. Except where otherwise specified in this part, all communications and reports...

  5. 10 CFR 110.4 - Communications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Communications. 110.4 Section 110.4 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL General Provisions § 110.4 Communications. Except where otherwise specified in this part, all communications and reports...

  6. 10 CFR 55.5 - Communications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... involving a test and research reactor facility licensed under 10 CFR part 50 and any related inquiry...

  7. 10 CFR 55.5 - Communications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... involving a test and research reactor facility licensed under 10 CFR part 50 and any related inquiry...

  8. 10 CFR 52.2 - Interpretations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Interpretations. 52.2 Section 52.2 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS General Provisions § 52.2 Interpretations. Except as specifically authorized by the Commission in writing, no...

  9. 75 FR 81675 - Notice of Issuance of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Fuel Cycle Facilities.'' FOR FURTHER INFORMATION CONTACT: Mekonen M. Bayssie, Regulatory Guide... Materials in Liquid and Gaseous Effluents from Nuclear Fuel Cycle Facilities,'' was published as Draft... guidance is applicable to nuclear fuel cycle facilities, with the exception of uranium milling facilities...

  10. 10 CFR 75.5 - Interpretations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Interpretations. 75.5 Section 75.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT General Provisions § 75.5 Interpretations. Except as authorized specifically by the Commission in writing, no...

  11. 10 CFR 75.5 - Interpretations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Interpretations. 75.5 Section 75.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT General Provisions § 75.5 Interpretations. Except as authorized specifically by the Commission in writing, no...

  12. 10 CFR 100.4 - Communications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... 10 Energy 2 2012-01-01 2012-01-01 false Communications. 100.4 Section 100.4 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.4 Communications. Except where otherwise...

  13. The CONNIE experiment

    NASA Astrophysics Data System (ADS)

    Aguilar-Arevalo, A.; Bertou, X.; Bonifazi, C.; Butner, M.; Cancelo, G.; Castaneda Vazquez, A.; Cervantes Vergara, B.; Chavez, C. R.; Da Motta, H.; D'Olivo, J. C.; Dos Anjos, J.; Estrada, J.; Fernandez Moroni, G.; Ford, R.; Foguel, A.; Hernandez Torres, K. P.; Izraelevitch, F.; Kavner, A.; Kilminster, B.; Kuk, K.; Lima, H. P., Jr.; Makler, M.; Molina, J.; Moreno-Granados, G.; Moro, J. M.; Paolini, E. E.; Sofo Haro, M.; Tiffenberg, J.; Trillaud, F.; Wagner, S.

    2016-10-01

    The CONNIE experiment uses fully depleted, high resistivity CCDs as particle detectors in an attempt to measure for the first time the Coherent Neutrino-Nucleus Elastic Scattering of antineutrinos from a nuclear reactor with silicon nuclei. This talk, given at the XV Mexican Workshop on Particles and Fields (MWPF), discussed the potential of CONNIE to perform this measurement, the installation progress at the Angra dos Reis nuclear power plant, as well as the plans for future upgrades.

  14. Nuclear Power Plant Mechanical Component Flooding Fragility Experiments Status

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pope, C. L.; Savage, B.; Johnson, B.

    This report describes progress on Nuclear Power Plant mechanical component flooding fragility experiments and supporting research. The progress includes execution of full scale fragility experiments using hollow-core doors, design of improvements to the Portal Evaluation Tank, equipment procurement and initial installation of PET improvements, designation of experiments exploiting the improved PET capabilities, fragility mathematical model development, Smoothed Particle Hydrodynamic simulations, wave impact simulation device research, and pipe rupture mechanics research.

  15. The CONNIE experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aguilar-Arevalo, A.; et al.

    2016-10-19

    The CONNIE experiment uses fully depleted, high resistivity CCDs as particle detectors in an attempt to measure for the first time the Coherent Neutrino-Nucleus Elastic Scattering of antineutrinos from a nuclear reactor with silicon nuclei.This talk, given at the XV Mexican Workshop on Particles and Fields (MWPF), discussed the potential of CONNIE to perform this measurement, the installation progress at the Angra dos Reis nuclear power plant, as well as the plans for future upgrades.

  16. Worldwide Report, Arms Control

    DTIC Science & Technology

    1985-08-29

    BRIEFS IAEA TO INSPECT SOVIET PLANTS —Vienna, 7 Aug (AFP)—The International Atomic Energy Agency (IAEA) will inspect two nuclear power stations and an... power —equal to the output of about 32 nuclear power plants —must be provided, which then, to be sure, would be needed for only about 2 minutes. But...which requires electric power plants conceived especially for this purpose. If, in installing this capacity, one assumes $300 per kilowatt—a value

  17. JPRS Report, Nuclear Developments

    DTIC Science & Technology

    1989-07-14

    power installation of the two reactors, station is continuing problem-free, despite recent upsets in China, according to the French firms building...LD2006192889 Moscow TASS in English sphere. He pointed to the need for a more responsible 1856 GMT 20 Jun 89 approach to the construction of nuclear power ...August, 1986, the Madras Atomic Power Station was directed to be shut down, in May 1988 the Tarapur [Text] Bombay, May 4. The choice of the site of the

  18. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saleh, Lydia Ilaiza, E-mail: lydiailaiza@gmail.com; Ryong, Kim Tae

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of thismore » paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.« less

  19. Nuclear component horizontal seismic restraint

    DOEpatents

    Snyder, Glenn J.

    1988-01-01

    A nuclear component horizontal seismic restraint. Small gaps limit horizontal displacement of components during a seismic occurrence and therefore reduce dynamic loadings on the free lower end. The reactor vessel and reactor guard vessel use thicker section roll-forged rings welded between the vessel straight shell sections and the bottom hemispherical head sections. The inside of the reactor guard vessel ring forging contains local vertical dovetail slots and upper ledge pockets to mount and retain field fitted and installed blocks. As an option, the horizontal displacement of the reactor vessel core support cone can be limited by including shop fitted/installed local blocks in opposing alignment with the reactor vessel forged ring. Beams embedded in the wall of the reactor building protrude into apertures in the thermal insulation shell adjacent the reactor guard vessel ring and have motion limit blocks attached thereto to provide to a predetermined clearance between the blocks and reactor guard vessel ring.

  20. Structures and construction of nuclear power plants on lunar surface

    NASA Astrophysics Data System (ADS)

    Shimizu, Katsunori; Kobatake, Masuhiko; Ogawa, Sachio; Kanamori, Hiroshi; Okada, Yasuhiko; Mano, Hideyuki; Takagi, Kenji

    1991-07-01

    The best structure and construction techniques of nuclear power plants in the severe environments on the lunar surface are studied. Facility construction types (functional conditions such as stable structure, shield thickness, maintainability, safety distances, and service life), construction conditions (such as construction methods, construction equipment, number of personnel, time required for construction, external power supply, and required transportation) and construction feasibility (construction method, reactor transportation between the moon and the earth, ground excavation for installation, loading and unloading, transportation, and installation, filling up the ground, electric power supply of plant S (300 kW class) and plant L (3000 kW class)) are outlined. Items to pay attention to in construction are (1) automation and robotization of construction; (2) cost reduction by multi functional robots; and (3) methods of supplying power to robots. A precast concrete block manufacturing plant is also outlined.

  1. Los Alamos Using Neutrons to Stop Nuclear Smugglers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Favalli, Andrea; Swinhoe, Martyn; Roark, Kevin

    Los Alamos National Laboratory researchers have successfully demonstrated for the first time that laser-generated neutrons can be enlisted as a useful tool in the War on Terror. The international research team used the short-pulse laser at Los Alamos's TRIDENT facility to generate a neutron beam with novel characteristics that interrogated a closed container to confirm the presence and quantity of nuclear material inside. The successful experiment paves the way for creation of a table-top-sized or truck-mounted neutron generator that could be installed at strategic locations worldwide to thwart smugglers trafficking in nuclear materials.

  2. Los Alamos Using Neutrons to Stop Nuclear Smugglers

    ScienceCinema

    Favalli, Andrea; Swinhoe, Martyn; Roark, Kevin

    2018-02-14

    Los Alamos National Laboratory researchers have successfully demonstrated for the first time that laser-generated neutrons can be enlisted as a useful tool in the War on Terror. The international research team used the short-pulse laser at Los Alamos's TRIDENT facility to generate a neutron beam with novel characteristics that interrogated a closed container to confirm the presence and quantity of nuclear material inside. The successful experiment paves the way for creation of a table-top-sized or truck-mounted neutron generator that could be installed at strategic locations worldwide to thwart smugglers trafficking in nuclear materials.

  3. South Asia and the Indian Ocean: The Strategic Environment, 1995-2010.

    DTIC Science & Technology

    1996-03-01

    chance of much more before 2010. India regards China as its principal long-term rival. Although the Chi- nese watch India’s nuclear development...and the pros- pects for nuclear war are low. Yet prospects for rolling back ongoing nuclear or missile programs in the region are slim, except in the...con- text of new global arrangements involving firm and time-bound com- mitments by all the nuclear powers. Conflict on the subcontinent is more

  4. Local Contributors and Predictability of Flash Drought at the Marena Oklahoma In Situ Sensor Testbed (MOISST) During 2012

    NASA Astrophysics Data System (ADS)

    Basara, J. B.; Otkin, J.; Mahan, H. R.; Anderson, M. C.; Hain, C.; Wagle, P.; Xiao, X.

    2014-12-01

    The Marena Oklahoma In Situ Sensor Testbed (MOISST) site was installed in May 2010 as part of the calibration and validation program for the NASA Soil Moisture Active Passive (SMAP) mission. The site includes more than 200 soil, vegetation, and atmospheric sensors installed over an approximately 64 hectare pasture in Central Oklahoma with 4 main stations and multiple sensors installed in profiles. Additional sensors located at the site include a COsmic-ray Soil Moisture Observing System, global position system reflectometers, a passive distributed temperature system, an eddy correlation flux tower, and a phenocam. During 2012, flash drought conditions occurred at the MOISST location as conditions transitioned from no drought in late April to D4 (exceptional drought) in mid August. The array of instruments captured the dramatic transition of land-surface conditions at the MOISST site, in particular during a period spanning approximately six weeks in July and August in whereby drought conditions changed from abnormally dry to exceptional drought and ecosystem collapsed occurred. Results for the analyses demonstrated that both soil moisture and vegetation dynamics were critical components to flash drought development. Further, when the Evaporative Stress Index (ESI) was applied to the MOISST site during 2012, the results demonstrated that the predictability of drought conditions were increased to nearly six weeks prior to flash drought development that began in July.

  5. 36 CFR 293.6 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., structures, and cutting of trees. 293.6 Section 293.6 Parks, Forests, and Public Property FOREST SERVICE... trees. Except as provided in the Wilderness Act, subsequent legislation establishing a particular... from aircraft; no structures or installations; and no cutting of trees for nonwilderness purposes. (a...

  6. State-of-the-art report on rapid repair techniques for bridge decks.

    DOT National Transportation Integrated Search

    1990-01-01

    Bridges that are candidates for rapid repair techniques have peak-hour traffic volumes that are so high that it is not practical to close a lane to repair the deck or to install a deck protection system except during off-peak traffic periods. This re...

  7. 36 CFR 293.6 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., structures, and cutting of trees. 293.6 Section 293.6 Parks, Forests, and Public Property FOREST SERVICE... trees. Except as provided in the Wilderness Act, subsequent legislation establishing a particular... from aircraft; no structures or installations; and no cutting of trees for nonwilderness purposes. (a...

  8. 36 CFR 293.6 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., structures, and cutting of trees. 293.6 Section 293.6 Parks, Forests, and Public Property FOREST SERVICE... trees. Except as provided in the Wilderness Act, subsequent legislation establishing a particular... from aircraft; no structures or installations; and no cutting of trees for nonwilderness purposes. (a...

  9. 36 CFR 293.6 - Commercial enterprises, roads, motor vehicles, motorized equipment, motorboats, aircraft...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., structures, and cutting of trees. 293.6 Section 293.6 Parks, Forests, and Public Property FOREST SERVICE... trees. Except as provided in the Wilderness Act, subsequent legislation establishing a particular... from aircraft; no structures or installations; and no cutting of trees for nonwilderness purposes. (a...

  10. 46 CFR 382.3 - Determination of fair and reasonable rate.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... capitalized improvements, shall be depreciated on a straight-line basis over a 20-year economic life, except... equal installments over the economic life of the vessels as determined in accordance with paragraph (b... that the vessel's constructed net book value, less outstanding constructed principal, is equity. The...

  11. 46 CFR 382.3 - Determination of fair and reasonable rate.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... capitalized improvements, shall be depreciated on a straight-line basis over a 20-year economic life, except... equal installments over the economic life of the vessels as determined in accordance with paragraph (b... that the vessel's constructed net book value, less outstanding constructed principal, is equity. The...

  12. 46 CFR 25.35-1 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Requirements. 25.35-1 Section 25.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED VESSELS REQUIREMENTS Backfire Flame Control § 25.35-1 Requirements. (a) Every gasoline engine installed in a motorboat or motor vessel after April 25, 1940, except...

  13. 46 CFR 25.35-1 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Requirements. 25.35-1 Section 25.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED VESSELS REQUIREMENTS Backfire Flame Control § 25.35-1 Requirements. (a) Every gasoline engine installed in a motorboat or motor vessel after April 25, 1940, except...

  14. 46 CFR 25.35-1 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Requirements. 25.35-1 Section 25.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED VESSELS REQUIREMENTS Backfire Flame Control § 25.35-1 Requirements. (a) Every gasoline engine installed in a motorboat or motor vessel after April 25, 1940, except...

  15. 14 CFR 25.903 - Engines.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... chapter. (2) Each turbine engine must comply with one of the following: (i) Sections 33.76, 33.77 and 33... any engine individually in flight, except that, for turbine engine installations, the means for... might be exposed to fire must be at least fire-resistant. If hydraulic propeller feathering systems are...

  16. 32 CFR 552.102 - Requirements for possession and use.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Firearms and Weapons § 552.102... within three working days after arrival on the installation, or after obtaining the weapon, except: (1... registered firearms in unit arms rooms. The unit arms room should utilize a standard weapons card and log...

  17. 14 CFR 27.927 - Additional tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... controlled by the pilot under normal operating conditions (such as where the primary engine power control is accomplished through the flight control), the following test must be made: (1) Under conditions associated with... the torque must be absorbed by the rotors to be installed, except that other ground or flight test...

  18. 14 CFR 27.927 - Additional tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... controlled by the pilot under normal operating conditions (such as where the primary engine power control is accomplished through the flight control), the following test must be made: (1) Under conditions associated with... the torque must be absorbed by the rotors to be installed, except that other ground or flight test...

  19. 30 CFR 75.1719-4 - Mining machines, cap lamps; requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Mining machines, cap lamps; requirements. 75... Mining machines, cap lamps; requirements. (a) Paint used on exterior surfaces of mining machines shall... frames or reflecting tape shall be installed on each end of mining machines, except that continuous...

  20. 30 CFR 75.1719-4 - Mining machines, cap lamps; requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Mining machines, cap lamps; requirements. 75... Mining machines, cap lamps; requirements. (a) Paint used on exterior surfaces of mining machines shall... frames or reflecting tape shall be installed on each end of mining machines, except that continuous...

  1. 14 CFR 33.71 - Lubrication system.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... bypass flow path. (6) Each strainer or filter required by this paragraph that has no bypass, except the... installed on an airplane approved for ETOPS, the oil tank must be designed to prevent a hazardous loss of.... Each oil radiator must withstand, without failure, any vibration, inertia, and oil pressure load to...

  2. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  3. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  4. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  5. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  6. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  7. 14 CFR 25.819 - Lower deck service compartments (including galleys).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... flight loads when occupied. (g) For each powered lift system installed between a lower deck service... following requirements: (1) Each lift control switch outside the lift, except emergency stop buttons, must be designed to prevent the activation of the life if the lift door, or the hatch required by...

  8. 14 CFR 25.819 - Lower deck service compartments (including galleys).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... flight loads when occupied. (g) For each powered lift system installed between a lower deck service... following requirements: (1) Each lift control switch outside the lift, except emergency stop buttons, must be designed to prevent the activation of the life if the lift door, or the hatch required by...

  9. 46 CFR 194.20-19 - Piping and electrical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...

  10. 46 CFR 194.20-19 - Piping and electrical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...

  11. 46 CFR 194.20-19 - Piping and electrical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...

  12. 46 CFR 194.20-19 - Piping and electrical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...

  13. 46 CFR 194.20-19 - Piping and electrical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... VESSELS HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS Chemical Stores and/or... not be installed within or pass through a chemical storeroom except as required for the chemical... Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations. ...

  14. 30 CFR 75.208 - Warning devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warning devices. 75.208 Section 75.208 Mineral... SAFETY STANDARDS-UNDERGROUND COAL MINES Roof Support § 75.208 Warning devices. Except during the installation of roof supports, the end of permanent roof support shall be posted with a readily visible warning...

  15. 30 CFR 75.208 - Warning devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Warning devices. 75.208 Section 75.208 Mineral... SAFETY STANDARDS-UNDERGROUND COAL MINES Roof Support § 75.208 Warning devices. Except during the installation of roof supports, the end of permanent roof support shall be posted with a readily visible warning...

  16. 30 CFR 75.208 - Warning devices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Warning devices. 75.208 Section 75.208 Mineral... SAFETY STANDARDS-UNDERGROUND COAL MINES Roof Support § 75.208 Warning devices. Except during the installation of roof supports, the end of permanent roof support shall be posted with a readily visible warning...

  17. 30 CFR 75.208 - Warning devices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Warning devices. 75.208 Section 75.208 Mineral... SAFETY STANDARDS-UNDERGROUND COAL MINES Roof Support § 75.208 Warning devices. Except during the installation of roof supports, the end of permanent roof support shall be posted with a readily visible warning...

  18. 30 CFR 75.208 - Warning devices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warning devices. 75.208 Section 75.208 Mineral... SAFETY STANDARDS-UNDERGROUND COAL MINES Roof Support § 75.208 Warning devices. Except during the installation of roof supports, the end of permanent roof support shall be posted with a readily visible warning...

  19. 75 FR 49394 - Guidance Regarding Deferred Discharge of Indebtedness Income of Corporations and Deferred...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... as a contribution of the debt instrument to capital. The term also includes the complete forgiveness... accounting is deferred until payments are received under the installment obligation, or until the taxpayer... respect to the electing member. 2. Exception for Distributions and Charitable Contributions Consistent...

  20. 46 CFR 95.05-10 - Fixed fire extinguishing systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... oil units, valves, or manifolds in the line between the settling tanks and the boilers. (e) Fire... approved system must be installed in all cargo compartments and tanks for combustible cargo, except for vessels engaged exclusively in the carriage of coal or grain in bulk. For cargo compartments and tanks...

  1. 46 CFR 182.420 - Engine cooling.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Engine cooling. 182.420 Section 182.420 Shipping COAST...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.420 Engine cooling. (a) Except as otherwise provided in paragraphs (b), (c), (d), and (e) of this section, all engines must be water cooled and meet...

  2. 46 CFR 182.420 - Engine cooling.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Engine cooling. 182.420 Section 182.420 Shipping COAST...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.420 Engine cooling. (a) Except as otherwise provided in paragraphs (b), (c), (d), and (e) of this section, all engines must be water cooled and meet...

  3. 46 CFR 182.425 - Engine exhaust cooling.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Engine exhaust cooling. 182.425 Section 182.425 Shipping...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.425 Engine exhaust cooling. (a) Except as otherwise provided in this paragraph, all engine exhaust pipes must be water cooled. (1) Vertical dry...

  4. 46 CFR 182.425 - Engine exhaust cooling.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Engine exhaust cooling. 182.425 Section 182.425 Shipping...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.425 Engine exhaust cooling. (a) Except as otherwise provided in this paragraph, all engine exhaust pipes must be water cooled. (1) Vertical dry...

  5. 46 CFR 182.420 - Engine cooling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Engine cooling. 182.420 Section 182.420 Shipping COAST...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.420 Engine cooling. (a) Except as otherwise provided in paragraphs (b), (c), (d), and (e) of this section, all engines must be water cooled and meet...

  6. 46 CFR 182.420 - Engine cooling.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Engine cooling. 182.420 Section 182.420 Shipping COAST...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.420 Engine cooling. (a) Except as otherwise provided in paragraphs (b), (c), (d), and (e) of this section, all engines must be water cooled and meet...

  7. 46 CFR 182.425 - Engine exhaust cooling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Engine exhaust cooling. 182.425 Section 182.425 Shipping...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.425 Engine exhaust cooling. (a) Except as otherwise provided in this paragraph, all engine exhaust pipes must be water cooled. (1) Vertical dry...

  8. 46 CFR 182.425 - Engine exhaust cooling.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Engine exhaust cooling. 182.425 Section 182.425 Shipping...) MACHINERY INSTALLATION Specific Machinery Requirements § 182.425 Engine exhaust cooling. (a) Except as otherwise provided in this paragraph, all engine exhaust pipes must be water cooled. (1) Vertical dry...

  9. 30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Safety and pollution prevention equipment... pollution prevention equipment quality assurance requirements. (a) General requirements. (1) Except as provided in paragraph (b)(1) of this section, you may install only certified safety and pollution...

  10. 14 CFR 27.1327 - Magnetic direction indicator.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Magnetic direction indicator. 27.1327... Magnetic direction indicator. (a) Except as provided in paragraph (b) of this section— (1) Each magnetic... vibration or magnetic fields; and (2) The compensated installation may not have a deviation, in level flight...

  11. 14 CFR 27.1327 - Magnetic direction indicator.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Magnetic direction indicator. 27.1327... Magnetic direction indicator. (a) Except as provided in paragraph (b) of this section— (1) Each magnetic... vibration or magnetic fields; and (2) The compensated installation may not have a deviation, in level flight...

  12. 30 CFR 250.1613 - Diverter systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... number of turns in the vent line(s) downstream of the spool outlet flange, and the radius of curvature of... utilizes only one spool outlet, branch lines shall be installed to provide downwind diversion capability, and (2) No spool outlet or diverter line internal diameter shall be less than 10 inches, except that...

  13. 30 CFR 250.1613 - Diverter systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a minimum number of turns in the vent line(s) downstream of the spool outlet flange, and the radius... system utilizes only one spool outlet, branch lines shall be installed to provide downwind diversion capability, and (2) No spool outlet or diverter line internal diameter shall be less than 10 inches, except...

  14. 30 CFR 250.1613 - Diverter systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... number of turns in the vent line(s) downstream of the spool outlet flange, and the radius of curvature of... utilizes only one spool outlet, branch lines shall be installed to provide downwind diversion capability, and (2) No spool outlet or diverter line internal diameter shall be less than 10 inches, except that...

  15. 30 CFR 250.1613 - Diverter systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... number of turns in the vent line(s) downstream of the spool outlet flange, and the radius of curvature of... utilizes only one spool outlet, branch lines shall be installed to provide downwind diversion capability, and (2) No spool outlet or diverter line internal diameter shall be less than 10 inches, except that...

  16. 46 CFR 183.420 - Navigation lights.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Navigation lights. 183.420 Section 183.420 Shipping...) ELECTRICAL INSTALLATION Lighting Systems § 183.420 Navigation lights. All vessels must have navigation lights..., except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that...

  17. 46 CFR 183.420 - Navigation lights.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Navigation lights. 183.420 Section 183.420 Shipping...) ELECTRICAL INSTALLATION Lighting Systems § 183.420 Navigation lights. All vessels must have navigation lights..., except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that...

  18. 46 CFR 183.420 - Navigation lights.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Navigation lights. 183.420 Section 183.420 Shipping...) ELECTRICAL INSTALLATION Lighting Systems § 183.420 Navigation lights. All vessels must have navigation lights..., except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that...

  19. 46 CFR 183.420 - Navigation lights.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Navigation lights. 183.420 Section 183.420 Shipping...) ELECTRICAL INSTALLATION Lighting Systems § 183.420 Navigation lights. All vessels must have navigation lights..., except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that...

  20. 46 CFR 183.420 - Navigation lights.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Navigation lights. 183.420 Section 183.420 Shipping...) ELECTRICAL INSTALLATION Lighting Systems § 183.420 Navigation lights. All vessels must have navigation lights..., except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that...

  1. 10 CFR 55.5 - Communications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... this part involving a test and research reactor facility licensed under 10 CFR part 50 and any related...

  2. NNSA Program Develops the Next Generation of Nuclear Security Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brim, Cornelia P.; Disney, Maren V.

    2015-09-02

    NNSA is fostering the next generation of nuclear security experts is through its successful NNSA Graduate Fellowship Program (NGFP). NGFP offers its Fellows an exceptional career development opportunity through hands-on experience supporting NNSA mission areas across policy and technology disciplines. The one-year assignments give tomorrow’s leaders in global nuclear security and nonproliferation unparalleled exposure through assignments to Program Offices across NNSA.

  3. Structural integrity of materials in nuclear service: a bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heddleson, F.A.

    This report contains 679 abstracts from the Nuclear Safety Information Center (NSIC) computer file dated 1973 through 1976 covering material properties with respect to structural integrity. All materials important to the nuclear industry (except concrete) are covered for mechanical properties, chemical properties, corrosion, fracture or failure, radiation damage, creep, cracking, and swelling. Keyword, author, and permuted-title indexes are included for the convenience of the user.

  4. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... sabotage vehicle bomb assault. (i) Land vehicles. Licensees shall: (A) Design, construct, install, and... fuel sabotage against the effects of the design basis threat of radiological sabotage land vehicle bomb...

  5. KSC-2012-3027

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install the second half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  6. KSC-2012-3028

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install the second half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  7. KSC-2012-3023

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install one half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  8. KSC-2012-3026

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install the second half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  9. KSC-2012-3022

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install one half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  10. KSC-2012-3029

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install the second half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  11. KSC-2012-3021

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install one half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  12. KSC-2012-3024

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – Technicians install one half of the payload fairing over the NuSTAR spacecraft as they continue to process the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  13. KSC-2012-3030

    NASA Image and Video Library

    2012-05-22

    VANDENBERG AFB, Calif. – A technicians checks the installation of the payload fairing over the NuSTAR spacecraft as processing continues for the spacecraft and its Pegasus rocket for launch. NuSTAR stands for Nuclear Spectroscopic Telescope Array. Photo credit: NASA/Randy Beaudoin

  14. Slanted baffle mist eliminator

    DOEpatents

    Vance, Richard F.

    1995-11-07

    An apparatus for the elimination of mist from off-gas during vitrification f nuclear waste, where baffles are installed on a slant toward the flow of the off-gasses eliminating the need to expand the cross-sectional area of the duct size.

  15. Preliminary safety concept for disposal of the very low level radioactive waste in Romania.

    PubMed

    Niculae, O; Andrei, V; Ionita, G; Duliu, O G

    2009-05-01

    In Romania, there are certain nuclear installations in operation or under decommissioning, all of them representing an important source of very low level waste (VLLW). This paper presents an overview on the approach of the VLLW management in Romania, focused on those resulted from the nuclear power plants decommissioning. At the same time, the basic elements of safety concept, together with some safety evaluations concerning VLLW repository are presented and discussed too.

  16. Seed and blanket fuel arrangement for dual-phase nuclear reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Congdon, S.P.; Fawcett, R.M.

    1992-09-22

    This patent describes a fuel management method for a dual-phase nuclear reactor, it comprises: installing a fuel bundle at a first core location accessed by coolant through a relatively small aperture, each of the bundles having a predetermined group of fuel elements; operating the reactor a first time; shutting down the reactor; reinstalling the fuel bundle at a second core location accessed by coolant through a relatively large aperture; and operating the reactor a second time.

  17. Method of installing a control room console in a nuclear power plant

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  18. 10 CFR 160.3 - Trespass.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Trespass. 160.3 Section 160.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) TRESPASSING ON COMMISSION PROPERTY § 160.3 Trespass. Unauthorized entry upon any facility, installation or real property subject to this part is prohibited. ...

  19. 10 CFR 160.3 - Trespass.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Trespass. 160.3 Section 160.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) TRESPASSING ON COMMISSION PROPERTY § 160.3 Trespass. Unauthorized entry upon any facility, installation or real property subject to this part is prohibited. ...

  20. 10 CFR 160.3 - Trespass.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Trespass. 160.3 Section 160.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) TRESPASSING ON COMMISSION PROPERTY § 160.3 Trespass. Unauthorized entry upon any facility, installation or real property subject to this part is prohibited. ...

  1. 10 CFR 160.3 - Trespass.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Trespass. 160.3 Section 160.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) TRESPASSING ON COMMISSION PROPERTY § 160.3 Trespass. Unauthorized entry upon any facility, installation or real property subject to this part is prohibited. ...

  2. 10 CFR 160.3 - Trespass.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Trespass. 160.3 Section 160.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) TRESPASSING ON COMMISSION PROPERTY § 160.3 Trespass. Unauthorized entry upon any facility, installation or real property subject to this part is prohibited. ...

  3. Security risks in nuclear waste management: Exceptionalism, opaqueness and vulnerability.

    PubMed

    Vander Beken, Tom; Dorn, Nicholas; Van Daele, Stijn

    2010-01-01

    This paper analyses some potential security risks, concerning terrorism or more mundane forms of crime, such as fraud, in management of nuclear waste using a PEST scan (of political, economic, social and technical issues) and some insights of criminologists on crime prevention. Nuclear waste arises as spent fuel from ongoing energy generation or other nuclear operations, operational contamination or emissions, and decommissioning of obsolescent facilities. In international and EU political contexts, nuclear waste management is a sensitive issue, regulated specifically as part of the nuclear industry as well as in terms of hazardous waste policies. The industry involves state, commercial and mixed public-private bodies. The social and cultural dimensions--risk, uncertainty, and future generations--resonate more deeply here than in any other aspect of waste management. The paper argues that certain tendencies in regulation of the industry, claimed to be justified on security grounds, are decreasing transparency and veracity of reporting, opening up invisible spaces for management frauds, and in doing allowing a culture of impunity in which more serious criminal or terrorist risks could arise. What is needed is analysis of this 'exceptional' industry in terms of the normal cannons of risk assessment - a task that this paper begins. Copyright 2009 Elsevier Ltd. All rights reserved.

  4. Automated meteorological data from commercial aircraft via satellite - Present experience and future implications

    NASA Technical Reports Server (NTRS)

    Steinberg, R.

    1978-01-01

    The National Aeronautics and Space Administration has developed a low-cost communications system to provide meteorological data from commercial aircraft, in near real-time, on a fully automated basis. The complete system including the low profile antenna and all installation hardware weighs 34 kg. The prototype system has been installed on a Pan American B-747 aircraft and has been providing meteorological data (wind angle and velocity, temperature, altitude and position as a function of time) on a fully automated basis for the past several months. The results have been exceptional. This concept is expected to have important implications for operational meteorology and airline route forecasting.

  5. 10 CFR 75.44 - Timing of advance notification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Timing of advance notification. 75.44 Section 75.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Advanced Notification and Expenses § 75.44 Timing of advance notification. (a) Except as provided...

  6. 10 CFR 75.44 - Timing of advance notification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Timing of advance notification. 75.44 Section 75.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Advanced Notification and Expenses § 75.44 Timing of advance notification. (a) Except as provided...

  7. 10 CFR 75.12 - Communication of information to IAEA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Communication of information to IAEA. 75.12 Section 75.12 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Facility and Location Information § 75.12 Communication of information to IAEA. (a) Except as...

  8. 10 CFR 75.12 - Communication of information to IAEA.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Communication of information to IAEA. 75.12 Section 75.12 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Facility and Location Information § 75.12 Communication of information to IAEA. (a) Except as...

  9. Felsenkeller shallow-underground accelerator laboratory for nuclear astrophysics

    NASA Astrophysics Data System (ADS)

    Bemmerer, D.; Cowan, T. E.; Gohl, S.; Ilgner, C.; Junghans, A. R.; Reinhardt, T. P.; Rimarzig, B.; Reinicke, S.; Röder, M.; Schmidt, K.; Schwengner, R.; Stöckel, K.; Szücs, T.; Takács, M.; Wagner, A.; Wagner, L.; Zuber, K.

    2015-05-01

    Favored by the low background in underground laboratories, low-background accelerator-based experiments are an important tool to study nuclear reactions involving stable charged particles. This technique has been used for many years with great success at the 0.4 MV LUNA accelerator in the Gran Sasso laboratory in Italy, proteced from cosmic rays by 1400 m of rock. However, the nuclear reactions of helium and carbon burning and the neutron source reactions for the astrophysical s-process require higher beam energies than those available at LUNA. Also the study of solar fusion reactions necessitates new data at higher energies. As a result, in the present NuPECC long range plan for nuclear physics in Europe, the installation of one or more higher-energy underground accelerators is strongly recommended. An intercomparison exercise has been carried out using the same HPGe detector in a typical nuclear astrophysics setup at several sites, including the Dresden Felsenkeller underground laboratory. It was found that its rock overburden of 45m rock, together with an active veto against the remaining muon flux, reduces the background to a level that is similar to the deep underground scenario. Based on this finding, a used 5 MV pelletron tandem with 250 μA upcharge current and external sputter ion source has been obtained and transported to Dresden. Work on an additional radio-frequency ion source on the high voltage terminal is underway. The project is now fully funded. The installation of the accelerator in the Felsenkeller is expected for the near future. The status of the project and the planned access possibilities for external users will be reported.

  10. Cancer in populations living near nuclear facilities. A survey of mortality nationwide and incidence in two states

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jablon, S.; Hrubec, Z.; Boice, J.D. Jr.

    Reports from the United Kingdom have described increases in leukemia and lymphoma among young persons living near certain nuclear installations. Because of concerns raised by these reports, a mortality survey was conducted in populations living near nuclear facilities in the United States. All facilities began service before 1982. Over 900,000 cancer deaths occurred from 1950 through 1984 in 107 counties with or near nuclear installations. Each study county was matched for comparison to three control counties in the same region. There were 1.8 million cancer deaths in the 292 control counties during the 35 years studied. Deaths due to leukemiamore » or other cancers were not more frequent in the study counties than in the control counties. For childhood leukemia mortality, the relative risk comparing the study counties with their controls before plant start-up was 1.08, while after start-up it was 1.03. For leukemia mortality at all ages, the relative risks were 1.02 before start-up and 0.98 after. For counties in two states, cancer incidence data were also available. For one facility, the standardized registration ratio for childhood leukemia was increased significantly after start-up. However, the increase also antedated the operation of this facility. The study is limited by the correlational approach and the large size of the geographic areas (counties) used. It does not prove the absence of any effect. If, however, any excess cancer risk was present in US counties with nuclear facilities, it was too small to be detected with the methods employed.« less

  11. Developing a structural health monitoring system for nuclear dry cask storage canister

    NASA Astrophysics Data System (ADS)

    Sun, Xiaoyi; Lin, Bin; Bao, Jingjing; Giurgiutiu, Victor; Knight, Travis; Lam, Poh-Sang; Yu, Lingyu

    2015-03-01

    Interim storage of spent nuclear fuel from reactor sites has gained additional importance and urgency for resolving waste-management-related technical issues. In total, there are over 1482 dry cask storage system (DCSS) in use at US plants, storing 57,807 fuel assemblies. Nondestructive material condition monitoring is in urgent need and must be integrated into the fuel cycle to quantify the "state of health", and more importantly, to guarantee the safe operation of radioactive waste storage systems (RWSS) during their extended usage period. A state-of-the-art nuclear structural health monitoring (N-SHM) system based on in-situ sensing technologies that monitor material degradation and aging for nuclear spent fuel DCSS and similar structures is being developed. The N-SHM technology uses permanently installed low-profile piezoelectric wafer sensors to perform long-term health monitoring by strategically using a combined impedance (EMIS), acoustic emission (AE), and guided ultrasonic wave (GUW) approach, called "multimode sensing", which is conducted by the same network of installed sensors activated in a variety of ways. The system will detect AE events resulting from crack (case for study in this project) and evaluate the damage evolution; when significant AE is detected, the sensor network will switch to the GUW mode to perform damage localization, and quantification as well as probe "hot spots" that are prone to damage for material degradation evaluation using EMIS approach. The N-SHM is expected to eventually provide a systematic methodology for assessing and monitoring nuclear waste storage systems without incurring human radiation exposure.

  12. 29 CFR 1926.500 - Scope, application, and definitions applicable to this subpart.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CC of this part. (iii) Fall protection requirements for employees performing steel erection work... for training in the installation and use of fall protection systems, except in relation to steel... component parts. Load refusal is the point where the ultimate strength is exceeded. Free fall means the act...

  13. 46 CFR 126.130 - Cranes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Cranes. 126.130 Section 126.130 Shipping COAST GUARD... § 126.130 Cranes. (a) Except as provided by paragraph (b) of this section, cranes, if installed, must... chapter. (b) The manufacturer of a crane may have tests and inspections conducted in compliance with § 107...

  14. 46 CFR 182.320 - Water heaters.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...

  15. 46 CFR 182.320 - Water heaters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...

  16. 40 CFR 63.307 - Standards for bypass/bleeder stacks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Coke Oven Batteries § 63.307 Standards for bypass/bleeder stacks. (a)(1) Except as otherwise... flow generated by the battery, which shall thereafter be operated and maintained. (2) Coke oven... operator of a brownfield coke oven battery or a padup rebuild shall install such a flare system before...

  17. 40 CFR 63.307 - Standards for bypass/bleeder stacks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... National Emission Standards for Coke Oven Batteries § 63.307 Standards for bypass/bleeder stacks. (a)(1.... (2) Coke oven emissions shall not be vented to the atmosphere through bypass/bleeder stacks, except.... (3) The owner or operator of a brownfield coke oven battery or a padup rebuild shall install such a...

  18. 40 CFR 63.307 - Standards for bypass/bleeder stacks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... National Emission Standards for Coke Oven Batteries § 63.307 Standards for bypass/bleeder stacks. (a)(1.... (2) Coke oven emissions shall not be vented to the atmosphere through bypass/bleeder stacks, except.... (3) The owner or operator of a brownfield coke oven battery or a padup rebuild shall install such a...

  19. 40 CFR 63.307 - Standards for bypass/bleeder stacks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Coke Oven Batteries § 63.307 Standards for bypass/bleeder stacks. (a)(1) Except as otherwise... flow generated by the battery, which shall thereafter be operated and maintained. (2) Coke oven... operator of a brownfield coke oven battery or a padup rebuild shall install such a flare system before...

  20. 40 CFR 63.307 - Standards for bypass/bleeder stacks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... National Emission Standards for Coke Oven Batteries § 63.307 Standards for bypass/bleeder stacks. (a)(1.... (2) Coke oven emissions shall not be vented to the atmosphere through bypass/bleeder stacks, except.... (3) The owner or operator of a brownfield coke oven battery or a padup rebuild shall install such a...

  1. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  2. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  3. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  4. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  5. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  6. 40 CFR 85.2103 - Emission performance warranty.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... nonconformity results or will result in the vehicle owner having to bear any penalty or other sanction... manufacturer shall remedy the nonconformity at no cost to the owner; except that, if the vehicle has been in... nonconformities resulting from the failure of components which have been installed in or on the vehicle for the...

  7. 46 CFR 126.130 - Cranes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cranes. 126.130 Section 126.130 Shipping COAST GUARD... § 126.130 Cranes. (a) Except as provided by paragraph (b) of this section, cranes, if installed, must... chapter. (b) The manufacturer of a crane may have tests and inspections conducted in compliance with § 107...

  8. 76 FR 25534 - Airworthiness Directives; Hamilton Sundstrand Propellers Model 247F Propellers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this AD, the... through FR2279 inclusive, FR 2398, FR2449 to FR2958 inclusive, FR20010710 to FR20010722 inclusive, and FR20010723RT to FR20020127RT inclusive, installed. Propeller blades reworked to Hamilton Sundstrand Service...

  9. 49 CFR 236.57 - Shunt and fouling wires.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Shunt and fouling wires. 236.57 Section 236.57...: All Systems Track Circuits § 236.57 Shunt and fouling wires. (a) Except as provided in paragraph (b) of this section, shunt wires and fouling wires hereafter installed or replaced shall consist of at...

  10. 49 CFR 236.57 - Shunt and fouling wires.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Shunt and fouling wires. 236.57 Section 236.57...: All Systems Track Circuits § 236.57 Shunt and fouling wires. (a) Except as provided in paragraph (b) of this section, shunt wires and fouling wires hereafter installed or replaced shall consist of at...

  11. 75 FR 1401 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Wilkes-Barre Housing Authority for the purchase and installation of tank-less water heaters in the Mineral Springs Village and Boulevard Town Homes. FOR FURTHER INFORMATION CONTACT: Dominique G. Blom... goods (tank-less water heaters) are not produced in the U.S. in sufficient and reasonably available...

  12. 49 CFR 393.65 - All fuel systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... motor vehicles or for the operation of auxiliary equipment installed on, or used in connection with, motor vehicles. (b) Location. Each fuel system must be located on the motor vehicle so that— (1) No part... will not contact any part of the exhaust or electrical systems of the vehicle, except the fuel level...

  13. 26 CFR 1.453-10 - Effective date.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 6 2010-04-01 2010-04-01 false Effective date. 1.453-10 Section 1.453-10...) INCOME TAXES Taxable Year for Which Items of Gross Income Included § 1.453-10 Effective date. (a) Except... other dispositions of installment obligations occurring after such date. [T.D. 6500, 25 FR 11718, Nov...

  14. 46 CFR 182.320 - Water heaters.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...

  15. 46 CFR 182.320 - Water heaters.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...

  16. 46 CFR 182.320 - Water heaters.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...

  17. Report of the Defense Task Force on Sexual Assault in the Military Services

    DTIC Science & Technology

    2009-12-01

    120 and 125, UCMJ sex -related criminal allegations (except for indecent exposure and indecent acts) occurring on military installations, involving...A-1  Annex B: Sex -Related Crimes... prophylaxis . (Recommendation 24) • The Secretary of Defense establish a Sexual Assault Forensic Examiner education program at military teaching

  18. 14 CFR 125.177 - Control of engine rotation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Control of engine rotation. 125.177 Section... Requirements § 125.177 Control of engine rotation. (a) Except as provided in paragraph (b) of this section... flight. (b) In the case of turbine engine installations, a means of stopping rotation need be provided...

  19. 75 FR 12775 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ... manufactured goods (ductless split HVAC systems) are not produced in the U.S. in sufficient and reasonably... Valley Housing Authority for the installation of a ductless split system during the LaCreole Manor Heating, Ventilation and Air Conditioning (HVAC) and Water Distribution Replacement Project. FOR FURTHER...

  20. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...

  1. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...

  2. 12 CFR 584.2-1 - Prescribed services and activities of savings and loan holding companies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... warehousing of such real estate loans, except that such a company or subsidiary shall not invest in a loan... installed therein), including brokerage and warehousing of such chattel paper; (iii) Loans, with or without... other multiple holding companies and affiliates thereof: (i) Data processing; (ii) Credit information...

  3. 12 CFR 584.2-1 - Prescribed services and activities of savings and loan holding companies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... warehousing of such real estate loans, except that such a company or subsidiary shall not invest in a loan... installed therein), including brokerage and warehousing of such chattel paper; (iii) Loans, with or without... other multiple holding companies and affiliates thereof: (i) Data processing; (ii) Credit information...

  4. 12 CFR 584.2-1 - Prescribed services and activities of savings and loan holding companies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... warehousing of such real estate loans, except that such a company or subsidiary shall not invest in a loan... installed therein), including brokerage and warehousing of such chattel paper; (iii) Loans, with or without... other multiple holding companies and affiliates thereof: (i) Data processing; (ii) Credit information...

  5. 10 CFR 4.314 - Exceptions to the rule against age discrimination. Reasonable factors other than age.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Exceptions to the rule against age discrimination. Reasonable factors other than age. 4.314 Section 4.314 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION... COMMISSION Regulations Implementing the Age Discrimination Act of 1975, as Amended Standards for Determining...

  6. 10 CFR 4.314 - Exceptions to the rule against age discrimination. Reasonable factors other than age.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Exceptions to the rule against age discrimination. Reasonable factors other than age. 4.314 Section 4.314 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION... COMMISSION Regulations Implementing the Age Discrimination Act of 1975, as Amended Standards for Determining...

  7. Geometry and solid angle corrections for accurate measurement of multipole and parity mixing ratios using nuclear orientation

    NASA Astrophysics Data System (ADS)

    Roccia, S.; Gaulard, C.; Étilé, A.; Chakma, R.

    2017-07-01

    In the context of nuclear orientation, we propose a new method to correct the multipole mixing ratios for asymmetries in the geometry of the setup but also in the detection system. This method is also robust against temperature fluctuations, beam intensity fluctuations and uncertainties in the nuclear structure of the nuclei. Additionally, this method provides a natural way to combine data from different detectors and make good use of all available statistics. We could use this method to demonstrate the accuracy that can be reached with the PolarEx setup now installed at the ALTO facility.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Needham, D.; Spearman, A.

    This paper describes the design and development of a modular gas control installation which is completely buried, except for a small instrument housing and vent pipe. Buried installations controlling gas pressure have many advantages:- no unsightly or costly housings, protection from damage by vehicles or vandals, no problems of acquisition of sites in built-up areas, no need to divert mains to alternative locations, reduced noise, and easier planning permission associated with environmental aspects. It had not previously been possible to realise these advantages with conventional equipment but a novel concept has emerged which solves the problems and provides additional benefits.more » All the working components of a single stream governor station are installed under a 600mm diameter surface access cover. The essential control elements are contained in a lightweight cartridge which can be exchanged in about 15 minutes by two men working from ground level.« less

  9. Conceptual design report for the project to install leak detection in FAST-FT-534/548/549

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galloway, K.J.

    1992-07-01

    This report provides conceptual designs and design recommendations for installing secondary containment and leak detection systems for three sumps at the Fluorinel and Storage Facility (FAST), CPP-666. The FAST facility is located at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). The three sumps receive various materials from the FAST water treatment process. This project involves sump upgrades to meet appropriate environmental requirements. The steps include: providing sump modifications or designs for the installation of leak chases and/or leakage accumulation, coating the sump concrete with a chemical resistant sealant (except for sump VES-FT-534 which ismore » already lined with stainless steel) to act as secondary containment, lining the sumps with a primary containment system, and providing a means to detect and remove primary containment leakage that may occur.« less

  10. Applications of Ultra-Intense, Short Laser Pulses

    NASA Astrophysics Data System (ADS)

    Ledingham, Ken W. D.

    The high intensity laser production of electron, proton, ion and photon beams is reviewed particularly with respect to the laser-plasma interaction which drives the acceleration process. A number of applications for these intense short pulse beams is discussed e.g. ion therapy, PET isotope production and laser driven transmutation studies. The future for laser driven nuclear physics at the huge new, multi-petawatt proposed laser installation ELI in Bucharest is described. Many people believe this will take European nuclear research to the next level.

  11. Nuclear Energy Policy

    DTIC Science & Technology

    2009-12-10

    Small Modular Reactors Rising cost estimates for large conventional nuclear power plants—widely projected to be $6 billion or more—have contributed to growing interest in proposals for smaller, modular reactors. Ranging from about 40 to 350 megawatts of electrical capacity, such reactors would be only a fraction of the size of current commercial reactors. Several modular reactors would be installed together to make up a power block with a single control room, under most concepts. Modular reactor concepts would use a variety of technologies,

  12. 76 FR 17751 - Hazardous Materials: Request for U.S. Competent Authority Approval of International Atomic Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... originally installed in the Bruce Power nuclear power plant near Tiverton, Ontario. The stated purpose of the transport is to conduct recycling and volume reduction activities in Sweden. Under the terms of the license...

  13. Nuclear Energy Present and Future

    NASA Astrophysics Data System (ADS)

    Hutchinson, I. H.

    2006-10-01

    Nuclear power plants currently generate about 20% of US and 17% of world electricity, which makes nuclear the largest non-emitting energy source in current use. Concerns about global climate change have led to a remarkable transformation of attitudes towards nuclear energy. There remain key challenges that must be faced when considering expansion of its contribution. In summary they are: Economics, Safety, Waste Disposal, and Proliferation. Electricity from legacy fission plants is highly competitive with fossil, but perceived financial risks make the large capital cost fraction a key hurdle to new-construction, and costs of 2 per installed Watt electrical are currently considered only just economically attractive. Proliferation of nuclear-weapons-enabling technology is a major concern for global stability, in which fusion may have significant technical advantages over fission. But proliferation control requires a combination of both technical and political initiatives. The feasibility of supplying process heat or hydrogen from nuclear energy inspires additional research into novel reactor concepts and associated technologies. The presentation will lay out this overall context of the nuclear energy renaissance.

  14. 2015 South Carolina PV Soft Cost and Workforce Development Part 2: Six Month Confirmation of Anticipated Job Growth

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, Elise B.; Edwards, Thomas B.

    In 2015, a program was initiated to carefully track and monitor the growth of the solar industry in SC. Prior to then, little information was available on the costs associated with distributed photovoltaic (PV) installations in the Southeastern US. For this report, data were collected from businesses on the number of hires they had at the end of 2014 and compared with data for 2015 and June 2016. It was found that the percentage of installers within the state who serve the residential sector increased to 82% from 67%. During the same time period, the average size of initiated installationsmore » for residential, commercial, and utility scale installations all trended upwards. Where residential installations were typically 5 kW-DC in 2014, they were typically 10 kW-DC by late 2015 and in mid-2016. For commercial installations, the average size grew from 84 kW-DC in 2014 to between 136-236 kW-DC in 2015 and then 188-248 kWDC in mid-2016. An exception was seen in utility scale installations where a 2.3 MW-DC system was common in 2014, the size grew to be 5-15 MW-DC in late 2015. The average size dropped 3.1-4.4 MWDC in mid-June 2016, though individual averages up to 20 MW-DC were reported.« less

  15. Monochromatic neutron beam production at Brazilian nuclear research reactors

    NASA Astrophysics Data System (ADS)

    Stasiulevicius, Roberto; Rodrigues, Claudio; Parente, Carlos B. R.; Voi, Dante L.; Rogers, John D.

    2000-12-01

    Monochomatic beams of neutrons are obtained form a nuclear reactor polychromatic beam by the diffraction process, suing a single crystal energy selector. In Brazil, two nuclear research reactors, the swimming pool model IEA-R1 and the Argonaut type IEN-R1 have been used to carry out measurements with this technique. Neutron spectra have been measured using crystal spectrometers installed on the main beam lines of each reactor. The performance of conventional- artificial and natural selected crystals has been verified by the multipurpose neutron diffractometers installed at IEA-R1 and simple crystal spectrometer in operator at IEN- R1. A practical figure of merit formula was introduced to evaluate the performance and relative reflectivity of the selected planes of a single crystal. The total of 16 natural crystals were selected for use in the neutron monochromator, including a total of 24 families of planes. Twelve of these natural crystal types and respective best family of planes were measured directly with the multipurpose neutron diffractometers. The neutron spectrometer installed at IEN- R1 was used to confirm test results of the better specimens. The usually conventional-artificial crystal spacing distance range is limited to 3.4 angstrom. The interplane distance range has now been increased to approximately 10 angstrom by use of naturally occurring crystals. The neutron diffraction technique with conventional and natural crystals for energy selection and filtering can be utilized to obtain monochromatic sub and thermal neutrons with energies in the range of 0.001 to 10 eV. The thermal neutron is considered a good tool or probe for general applications in various fields, such as condensed matter, chemistry, biology, industrial applications and others.

  16. Distributed optical fibre temperature measurements in a low dose rate radiation environment based on Rayleigh backscattering

    NASA Astrophysics Data System (ADS)

    Faustov, A.; Gussarov, A.; Wuilpart, M.; Fotiadi, A. A.; Liokumovich, L. B.; Kotov, O. I.; Zolotovskiy, I. O.; Tomashuk, A. L.; Deschoutheete, T.; Mégret, P.

    2012-04-01

    On-line monitoring of environmental conditions in nuclear facilities is becoming a more and more important problem. Standard electronic sensors are not the ideal solution due to radiation sensitivity and difficulties in installation of multiple sensors. In contrast, radiation-hard optical fibres can sustain very high radiation doses and also naturally offer multi-point or distributed monitoring of external perturbations. Multiple local electro-mechanical sensors can be replaced by just one measuring fibre. At present, there are over four hundred operational nuclear power plants (NPPs) in the world 1. Operating experience has shown that ineffective control of the ageing degradation of major NPP components can threaten plant safety and also plant life. Among those elements, cables are vital components of I&C systems in NPPs. To ensure their safe operation and predict remaining life, environmental monitoring is necessary. In particular, temperature and radiation dose are considered to be the two most important parameters. The aim of this paper is to assess experimentally the feasibility of optical fibre temperature measurements in a low doserate radiation environment, using a commercially available reflectometer based on Rayleigh backscattering. Four different fibres were installed in the Sub-Pile Room of the BR2 Material testing nuclear reactor in Mol, Belgium. This place is man-accessible during the reactor shut-down, allowing easy fibre installation. When the reactor operates, the dose-rates in the room are in a range 0.005-5 Gy/h with temperatures of 40-60 °C, depending on the location. Such a surrounding is not much different to some "hot" environments in NPPs, where I&C cables are located.

  17. Studies of Postdisaster Economic Recovery: Analysis, Synthesis, and Assessment

    DTIC Science & Technology

    1987-06-01

    of a large-scale nuclear disaster can be viewed in the aggre- gate as attempting to answer two broad questions: 1. Do resources survive in sufficient...With respect to economic institutional issues in the aftermath of a nuclear disaster , published research has been, almost without exception, speculative...possibilities. There are at least three major themes that per- meate the literature on economic control in the event of a large-scale nuclear disaster . First

  18. National Security to Nationalist Myth: Why Iran Wants Nuclear Weapons

    DTIC Science & Technology

    2004-09-01

    Atomic Energy Organization of Iran ( AEOI ),81 as well as Iran’s nuclear technology suppliers. By publicly embracing the “nuclear insecurity” myth and...81 The literature variously refers to the Atomic Energy Organization of Iran as “ AEOI ,” or “IAEO...I have adopted “ AEOI ,” the form used by the IAEA, except where quoting other sources. See “Implementation of the NPT Safeguards Agreement in the

  19. The (de)politicisation of nuclear power: The Finnish discussion after Fukushima.

    PubMed

    Ylönen, Marja; Litmanen, Tapio; Kojo, Matti; Lindell, Pirita

    2017-04-01

    When the Fukushima accident occurred in March 2011, Finland was at the height of a nuclear renaissance, with the Government's decision-in-principle in 2010 to allow construction of two new nuclear reactors. This article examines the nuclear power debate in Finland after Fukushima. We deploy the concepts of (de)politicisation and hyperpoliticisation in the analysis of articles in the country's main newspaper. Our analysis indicates that Finnish nuclear exceptionalism manifested in the safety-related depoliticising and the nation's prosperity-related hyperpoliticisation arguments of the pro-nuclear camp. The anti-nuclear camp used politicisation strategies, such as economic arguments, to show the unprofitability of nuclear power. The Fukushima accident had a clear effect on Finnish nuclear policy: the government programme of 2011 excluded the nuclear new build. However, in 2014 the majority of Parliament again supported nuclear power. Hence, the period after Fukushima until 2014 could be described as continued but undermined loyalty to nuclear power.

  20. 78 FR 47012 - Developing Software Life Cycle Processes Used in Safety Systems of Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0195] Developing Software Life Cycle Processes Used in... revised regulatory guide (RG), revision 1 of RG 1.173, ``Developing Software Life Cycle Processes for... Developing a Software Project Life Cycle Process,'' issued 2006, with the clarifications and exceptions as...

Top