Science.gov

Sample records for nuclear installations gt1

  1. Nuclear reactor installation

    SciTech Connect

    Straub, H.

    1987-09-29

    A nuclear reactor installation is described comprising a pressure vessel having a pair of concentric walls defining a peripheral chamber therebetween; a reactor core disposed within the pressure vessel for heating a primary coolant; a cooling circuit for conveying a secondary coolant in heat exchange relation with the primary coolant. The circuit includes at least one primary heat exchanger within the pressure vessel, at least one secondary heat exchanger outside the pressure vessel, coolant lines extending through the pressure vessel and connecting the heat exchanges together, and circulating means for circulating a secondary coolant through the heat exchangers; a heat sink extending around the pressure vessel; a source of at least one flowable heat-insulating agent outside the pressure vessel; a source of at least one flowable heat-conductive agent outside the pressure vessel; first means communicating the source of heat-insulating agent with the peripheral chamber during normal operation of the reactor core; and second means communicating the source of heat-conductive agent with the peripheral chamber to fill the chamber with heat-conductive agent in response to a disturbance in reactor core cooling.

  2. ALARA in European nuclear installations

    SciTech Connect

    Lefaure, C.; Croft, J.; Pfeffer, W.; Zeevaert, T.

    1995-03-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe.

  3. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  4. Nuclear Plant Analyzer: Installation manual. Volume 1

    SciTech Connect

    Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R. |

    1995-01-01

    This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays.

  5. Technical Reliability Assessment of the Actigraph GT1M Accelerometer

    ERIC Educational Resources Information Center

    Silva, Pedro; Mota, Jorge; Esliger, Dale; Welk, Gregory

    2010-01-01

    The purpose of this study was to determine the reliability of the Actigraph GT1M (Pensacola, FL, USA) accelerometer activity count and step functions. Fifty GT1M accelerometers were initialized to collect simultaneous acceleration counts and steps data using 15-sec epochs. All reliability testing was completed using a mechanical shaker plate to…

  6. Technical Reliability Assessment of the Actigraph GT1M Accelerometer

    ERIC Educational Resources Information Center

    Silva, Pedro; Mota, Jorge; Esliger, Dale; Welk, Gregory

    2010-01-01

    The purpose of this study was to determine the reliability of the Actigraph GT1M (Pensacola, FL, USA) accelerometer activity count and step functions. Fifty GT1M accelerometers were initialized to collect simultaneous acceleration counts and steps data using 15-sec epochs. All reliability testing was completed using a mechanical shaker plate to…

  7. Effect of ganglioside GT1b on the in vitro maturation of porcine oocytes and embryonic development

    PubMed Central

    HWANG, Seon-Ung; JEON, Yubyeol; YOON, Junchul David; CAI, Lian; KIM, Eunhye; YOO, Hyunju; KIM, Kyu-Jun; PARK, Kyu Mi; JIN, Minghui; KIM, Hyunggee; HYUN, Sang-Hwan

    2015-01-01

    Ganglioside is an acidic glycosphingolipid with sialic acids residues. This study was performed to investigate the effect and mechanism of ganglioside GT1b in porcine oocytes in the process of in vitro maturation (IVM) and preimplantation development. Metaphase II (MII) rates were significantly (P < 0.05) different between the control group and the 5 nM GT1b treatment group. Intracellular glutathione (GSH) levels in oocytes matured with 5 nM and 20 nM and GT1b decreased significantly (P < 0.05). The 10 nM group showed a significant (P < 0.05) decrease in intracellular reactive oxygen species (ROS) levels compared with the control group. Subsequently, the level of intracellular Ca2+ in oocytes treated with different concentrations of GT1b was measured. Intracellular Ca2+ was significantly (P < 0.05) increased with a higher concentration of GT1b in a dose-dependent manner. Real-time PCR was performed and showed that the expression of bradykinin 2 receptor (B2R) and calcium/calmodulin-dependent protein kinase II delta (CaMKIIδ) in cumulus cells was significantly (P < 0.05) decreased in the 20 nM GT1b treatment group. Treatment with 5 nM GT1b significantly (P < 0.05) decreased the expression of CaMKIIδ. In oocytes, treatment with 5 nM GT1b significantly (P < 0.05) decreased CaMKIIγ and POU5F1 (POU domain, class 5, transcription factor 1). However, treatment with 20 nM GT1b significantly (P < 0.05) increased the expression of POU5F1. Finally, embryonic developmental data showed no significant differences in the two experiments (parthenogenesis and in vitro fertilization). In conclusion, the results of the present study indicated that GT1b plays an important role in increasing the nuclear maturation rate and decreasing the intracellular ROS levels during IVM. However, GT1b inhibited maturation of the cytoplasm by maintaining intracellular Ca2+ in the process of oocyte maturation regardless of the cell cycle stage. Therefore, GT1b is thought to act on another mechanism

  8. Gemini Program Mission Report for Gemini-Titan 1 (GT-1)

    NASA Technical Reports Server (NTRS)

    1964-01-01

    The Gemini-Titan 1 (GT-1) space vehicle was comprised of the Gemini spacecraft and the Gemini launch vehicle. The Gemini launch vehicle is a two-stage modified Titan II ICBM. The major modifications are the addition of a malfunction detection system and a secondary flight controls system. The Gemini spacecraft, designed to carry a crew of two men on earth orbital and rendezvous missions, was unmanned for the flight reported herein (GT-1). There were no complete Gemini flight systems on board; however, the C-band transponder and telemetry transmitters were Gemini flight subsystems. Dummy equipment, having a mass and moment of inertia equal to flight system equipment, was installed in the spacecraft. The Spacecraft was instrumented to obtain data on spacecraft heating, structural loading, vibration, sound pressure levels, and temperature and pressure during the launch phase.

  9. Remote installation of risers on underground nuclear waste storage tanks

    SciTech Connect

    Jackson, J.P.; Gessner, R.F.

    1988-03-01

    The West Valley Demonstration Project was established to solidify 2120 m/sup 3/ (560,000) gallons of high-level nuclear waste generated during six years of commercial nuclear fuel reprocessing. This liquid will be processed to remove radioactive elements which, with the remaining sludge, will be combined with glass formers and be converted into borosilicate glass. Risers were installed on the high-level tank for installation of pumps which will be used to remove the liquid and sludge. The extensive use of remote technology was required to install the risers and to minimize operator exposure to high levels of radiation and contamination. The riser installation required remotely: drilling through two feet of concrete shielding; installing pump access pipes which are welded to the tank top; and cutting holes in tanks located 3658 mm (12) feet below ground. These operations were successfully completed 13 times without exposing personnel to high-level radiation or contamination. Specially designed remote equipment was developed for each step of this operation. Extensive operator training in the use of this equipment was performed on a tank with low radiation prior to work on the high-level tank. This paper discusses the application of remote technology that assured a quality job was safely accomplished. 3 refs., 18 figs., 2 tabs.

  10. Conceptual Design of Multicell Nuclear Power Installation Driven by Accelerators

    NASA Astrophysics Data System (ADS)

    Plotnikov Chuvilo, Sv, IV; Danilov, Mm; Katarzhnov, Yd; Kushin, Vv; Nedopekin Rogov, Vg, Vi

    1997-05-01

    The problem of nuclear safety and reliability of power installation based on accelerator-driver. The maximum reliability of electronuclear power installation may be reached by designing it as sum of several subcritical multiplying assemblies each driven by individual accelerator. Every cell is insulated from neutron fluxes of other cells while connects with common output collector of the heat transport medium which connected with turbine assembly and electric generator via heat-exchange steam generator. The variants of one-cell unit driven with 800 MeV proton accelerator and 6-cell system driven with 30 MeV deuteron linacs are considered. It is shown, that in multicell system for neutron multiplying factor increase it is profitable to use blankets in the form of sectionalized subcritical multiplying assemblies with cells separated by neutron gates.

  11. Installation for a nuclear power station with staggered swimming pools

    SciTech Connect

    Gigou, R.

    1982-12-28

    In an installation for a nuclear power station comprising a ''reactor building'' with a first swimming pool for handling of fuel units and a fuel building with a second swimming pool for the transfer, storage and deactivation of the units, the second swimming pool is located at a lower level than that of the first and is connected to the first by an intermediate auxiliary chamber filled with water and located under the first swimming pool. The auxiliary chamber is connected by a vertical pipeline to the first swimming pool and by a horizontal connecting pipeline to the second swimming pool. Each of the pipelines is provided with a shut-off valve, with interlocking means which prevents the simultaneous opening of the two valves. There is negligible dead space around a conveyor basket for fuel units when it is in the vertical or horizontal pipelines.

  12. The LPMS-V installation and operational experience at Arkansas nuclear one

    SciTech Connect

    Lexa, A.F. : Hudson, E.

    1995-12-31

    This paper describes a new replacement system for the existing vibrations and loose parts monitoring system for the Arkansas Nuclear One (ANO) units 1 and 2, in Russellville, Arkansas. The installation and operational history are also discussed.

  13. 76 FR 22935 - Calvert Cliffs Nuclear Power Plant, LLC Independent Spent Fuel Storage Installation; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Calvert Cliffs Nuclear Power Plant, LLC Independent Spent Fuel Storage Installation; Notice of Docketing, Notice of Proposed Action, and Notice of Opportunity for a Hearing for Renewal of Special...

  14. 75 FR 60147 - Calvert Cliffs Nuclear Power Plant, LLC; Independent Spent Fuel Storage Installation; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... COMMISSION Calvert Cliffs Nuclear Power Plant, LLC; Independent Spent Fuel Storage Installation; Notice of... Nuclear Power Plant, LLC (CCNPP) submitted an application to NRC, in accordance with 10 CFR Part 72....61 x 10\\15\\ MeV/sec/assembly to allow fuel that reaches the TS LCO 3.1.1(5) assembly thermal limit...

  15. Strategic considerations for the sustainable remediation of nuclear installations.

    PubMed

    Mobbs, S; Orr, P; Weber, I

    2017-08-05

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable the sites or parts of the sites to be reused. Although this is relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic detriments and benefits that should be taken into account. Recent experience of OECD Nuclear Energy Agency (NEA) member countries in the remediation of contaminated land, predominantly contaminated soil and groundwater, on nuclear sites during decommissioning has been assessed by an NEA task group. The experience was used to identify strategic considerations for nuclear site remediation, to consider the application of sustainability principles to nuclear site remediation, to describe good practice, and to make recommendations for further research and development. The key aspects that were identified were that 1) site remediation should be sustainable by resulting in an overall net benefit; and 2) an adaptive approach is essential in order to take into account the inherent uncertainty associated with the decommissioning and site remediation timescales. A report describing the findings was published by OECD/NEA in 2016. The conclusions provide insights to decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so that they can achieve sustainable remediation of nuclear sites, now and in the future. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Ganglioside GT1b protects human spermatozoa from hydrogen peroxide-induced DNA and membrane damage.

    PubMed

    Gavella, Mirjana; Garaj-Vrhovac, Verica; Lipovac, Vaskresenija; Antica, Mariastefania; Gajski, Goran; Car, Nikica

    2010-06-01

    We have reported previously that various gangliosides, the sialic acid containing glycosphingolipids, provide protection against sperm injury caused by reactive oxygen species (ROS). In this study, we investigated the effect of treatment of human spermatozoa with ganglioside GT1b on hydrogen peroxide (H(2)O(2))-induced DNA fragmentation and plasma membrane damage. Single-cell gel electrophoresis (Comet assay) used in the assessment of sperm DNA integrity showed that in vitro supplemented GT1b (100 microm) significantly reduced DNA damage induced by H(2)O(2) (200 microm) (p < 0.05). Measurements of Annexin V binding in combination with the propidium iodide vital dye labelling demonstrated that the spermatozoa pre-treated with GT1b exhibited a significant increase (p < 0.05) in the percentage of live cells with intact membrane and decreased phosphatidylserine translocation after exposure to H(2)O(2). Flow cytometry using the intracellular ROS-sensitive fluorescence dichlorodihydrofluorescein diacetate dye employed to investigate the transport of the extracellularly supplied H(2)O(2) into the cell interior revealed that ganglioside GT1b completely inhibited the passage of H(2)O(2) through the sperm membrane. These results suggest that ganglioside GT1b may protect human spermatozoa from H(2)O(2)-induced damage by rendering sperm membrane more hydrophobic, thus inhibiting the diffusion of H(2)O(2) across the membrane.

  17. Fallout from atmospheric bomb tests and releases from nuclear installations

    NASA Astrophysics Data System (ADS)

    Völkle, H.; Murith, C.; Surbeck, H.

    This work presents the radioactivity monitoring programme in Switzerland. Environmental radioactivity measurements for atomic bomb test fallout are discussed together with the radiation doses to the public caused by fallout. In the second part the monitoring programme around nuclear power stations is presented. The radioactivity releases to the environment, the results of the monitoring programme and the radiation doses to the public in the vicinity of the plants are discussed.

  18. Public participation processes related to nuclear research installations: what are the driving factors behind participation intention?

    PubMed

    Turcanu, Catrinel; Perko, Tanja; Laes, Erik

    2014-04-01

    This article addresses organised public participation processes related to installations for nuclear research. The aim was to determine predictors that could provide an empirical insight into the motivations underlying people's intended level of involvement. The results highlight attitude towards participation and moral norm as the strongest predictors for participation intention. Other significant predictors were time constraints, attitude towards nuclear energy, subjective and descriptive norms, and knowledge. An opposing relationship is noted between participation intention and attitude towards nuclear energy. At the same time, people who are more knowledgeable about the nuclear domain seem more willing to get involved. The analysis also revealed that financial benefits do not influence people's intended involvement in participation processes related to nuclear research installations. The results reported here are based on empirical data from a large-scale public opinion survey (N = 1020) carried out in Belgium during May-June 2011.

  19. Chavir: Virtual reality simulation for interventions in nuclear installations

    SciTech Connect

    Thevenon, J. B.; Tirel, O.; Lopez, L.; Chodorge, L.; Desbats, P.

    2006-07-01

    Companies involved in the nuclear industry have to prepare for interventions by precisely analyzing the radiological risks and rapidly evaluating the consequences of their operational choices. They also need to consolidate the experiences gained in the field with greater responsiveness and lower costs. This paper brings out the advantages of using virtual reality technology to meet the demands in the industry. The CHAVIR software allows the operators to prepare (and repeat) all the operations they would have to do in a safe virtual world, before performing the actual work inside the facilities. Since the decommissioning or maintenance work is carried out in an environment where there is radiation, the amount of radiation that the operator would be exposed to is calculated and integrated into the simulator. (authors)

  20. MODELING ATMOSPHERIC RELEASES OF TRITIUM FROM NUCLEAR INSTALLATIONS

    SciTech Connect

    Okula, K

    2007-01-17

    Tritium source term analysis and the subsequent dispersion and consequence analyses supporting the safety documentation of Department of Energy nuclear facilities are especially sensitive to the applied software analysis methodology, input data and user assumptions. Three sequential areas in tritium accident analysis are examined in this study to illustrate where the analyst should exercise caution. Included are: (1) the development of a tritium oxide source term; (2) use of a full tritium dispersion model based on site-specific information to determine an appropriate deposition scaling factor for use in more simplified, broader modeling, and (3) derivation of a special tritium compound (STC) dose conversion factor for consequence analysis, consistent with the nature of the originating source material. It is recommended that unless supporting, defensible evidence is available to the contrary, the tritium release analyses should assume tritium oxide as the species released (or chemically transformed under accident's environment). Important exceptions include STC situations and laboratory-scale releases of hydrogen gas. In the modeling of the environmental transport, a full phenomenology model suggests that a deposition velocity of 0.5 cm/s is an appropriate value for environmental features of the Savannah River Site. This value is bounding for certain situations but non-conservative compared to the full model in others. Care should be exercised in choosing other factors such as the exposure time and the resuspension factor.

  1. Installation and evaluation of a nuclear power plant operator advisor based on artificial intelligence technology

    SciTech Connect

    Hajek, B.K.; Miller, D.W.

    1989-06-20

    This report discusses the following topics on a Nuclear Power Plant operator advisor based on artificial Intelligence Technology; Workstation conversion; Software Conversion; V V Program Development Development; Simulator Interface Development; Knowledge Base Expansion; Dynamic Testing; Database Conversion; Installation at the Perry Simulator; Evaluation of Operator Interaction; Design of Man-Machine Interface; and Design of Maintenance Facility.

  2. Childhood leukaemia incidence around French nuclear installations using geographic zoning based on gaseous discharge dose estimates

    PubMed Central

    Evrard, A-S; Hémon, D; Morin, A; Laurier, D; Tirmarche, M; Backe, J-C; Chartier, M; Clavel, J

    2006-01-01

    The present study investigated for the first time the incidence of childhood leukaemia (1990–2001) around French nuclear installations using a geographic zoning based on estimated doses to the red bone marrow due to gaseous radioactive discharges. The observed number of cases of acute leukaemia (O=750) in 40 km2 centred on 23 French nuclear installations between 1990 and 2001 was lower than expected (E=795.01), although not significantly so (standardised incidence ratio SIR=0.94, 95% confidence interval=(0.88–1.01)). In none of the five zones defined on the basis of the estimated doses was the SIR significantly >1. There was no evidence of a trend in SIR with the estimated doses for all the children or for any of the three age groups studied. This study confirmed that there was no evidence of an increased incidence of childhood leukaemia around the 23 French nuclear sites. PMID:16622448

  3. Improving the turbine district heating installations of single-circuit nuclear power plants

    NASA Astrophysics Data System (ADS)

    Kondurov, E. P.; Kruglikov, P. A.; Smolkin, Yu. V.

    2015-10-01

    Ways for improving the turbine district heating installations of single-circuit nuclear power plants are considered as a possible approach to improving the nuclear power plant energy efficiency. The results of thermal tests carried out at one of single-circuit NPPs in Russia with a view to reveal the possibilities of improving the existing heat-transfer equipment of the turbine district heating installation without making significant investments in it were taken as a basis for the analysis. The tests have shown that there is certain energy saving potential in some individual units and elements in the turbine district heating installation's process circuit. A significant amount of thermal energy can be obtained only by decreasing the intermediate circuit temperature at the inlet to the heater of the first district-heating extraction. The taking of this measure will also lead to an additional amount of generated electricity because during operation with the partially loaded first heater, the necessary amount of heat has to be obtained from the peaking heater by reducing live steam. An additional amount of thermal energy can also be obtained by eliminating leaks through the bypass control valves. The possibility of achieving smaller consumption of electric energy for power plant auxiliaries by taking measures on reducing the available head in the intermediate circuit installation's pump unit is demonstrated. Partial cutting of pump impellers and dismantling of control valves are regarded to be the most efficient methods. The latter is attributed to qualitative control of the turbine district heating installation's thermal load. Adjustment of the noncondensable gas removal system will make it possible to improve the performance of the turbine district heating installation's heat-transfer equipment owing to bringing the heat-transfer coefficients in the heaters to the design level. The obtained results can be used for estimating the energy saving potential at other

  4. Biosynthesis of the major brain gangliosides GD1a and GT1b

    PubMed Central

    Sturgill, Elizabeth R; Aoki, Kazuhiro; Lopez, Pablo HH; Colacurcio, Daniel; Vajn, Katarina; Lorenzini, Ileana; Majić, Senka; Yang, Won Ho; Heffer, Marija; Tiemeyer, Michael; Marth, Jamey D; Schnaar, Ronald L

    2012-01-01

    Gangliosides—sialylated glycosphingolipids—are the major glycoconjugates of nerve cells. The same four structures—GM1, GD1a, GD1b and GT1b—comprise the great majority of gangliosides in mammalian brains. They share a common tetrasaccharide core (Galβ1–3GalNAcβ1-4Galβ1-4Glcβ1-1′Cer) with one or two sialic acids on the internal galactose and zero (GM1 and GD1b) or one (GD1a and GT1b) α2–3-linked sialic acid on the terminal galactose. Whereas the genes responsible for the sialylation of the internal galactose are known, those responsible for terminal sialylation have not been established in vivo. We report that St3gal2 and St3gal3 are responsible for nearly all the terminal sialylation of brain gangliosides in the mouse. When brain ganglioside expression was analyzed in adult St3gal1-, St3gal2-, St3gal3- and St3gal4-null mice, only St3gal2-null mice differed significantly from wild type, expressing half the normal amount of GD1a and GT1b. St3gal1/2-double-null mice were no different than St3gal2-single-null mice; however, St3gal2/3-double-null mice were >95% depleted in gangliosides GD1a and GT1b. Total ganglioside expression (lipid-bound sialic acid) in the brains of St3gal2/3-double-null mice was equivalent to that in wild-type mice, whereas total protein sialylation was reduced by half. St3gal2/3-double-null mice were small, weak and short lived. They were half the weight of wild-type mice at weaning and displayed early hindlimb dysreflexia. We conclude that the St3gal2 and St3gal3 gene products (ST3Gal-II and ST3Gal-III sialyltransferases) are largely responsible for ganglioside terminal α2-3 sialylation in the brain, synthesizing the major brain gangliosides GD1a and GT1b. PMID:22735313

  5. Biosynthesis of the major brain gangliosides GD1a and GT1b.

    PubMed

    Sturgill, Elizabeth R; Aoki, Kazuhiro; Lopez, Pablo H H; Colacurcio, Daniel; Vajn, Katarina; Lorenzini, Ileana; Majić, Senka; Yang, Won Ho; Heffer, Marija; Tiemeyer, Michael; Marth, Jamey D; Schnaar, Ronald L

    2012-10-01

    Gangliosides-sialylated glycosphingolipids-are the major glycoconjugates of nerve cells. The same four structures-GM1, GD1a, GD1b and GT1b-comprise the great majority of gangliosides in mammalian brains. They share a common tetrasaccharide core (Galβ1-3GalNAcβ1-4Galβ1-4Glcβ1-1'Cer) with one or two sialic acids on the internal galactose and zero (GM1 and GD1b) or one (GD1a and GT1b) α2-3-linked sialic acid on the terminal galactose. Whereas the genes responsible for the sialylation of the internal galactose are known, those responsible for terminal sialylation have not been established in vivo. We report that St3gal2 and St3gal3 are responsible for nearly all the terminal sialylation of brain gangliosides in the mouse. When brain ganglioside expression was analyzed in adult St3gal1-, St3gal2-, St3gal3- and St3gal4-null mice, only St3gal2-null mice differed significantly from wild type, expressing half the normal amount of GD1a and GT1b. St3gal1/2-double-null mice were no different than St3gal2-single-null mice; however, St3gal2/3-double-null mice were >95% depleted in gangliosides GD1a and GT1b. Total ganglioside expression (lipid-bound sialic acid) in the brains of St3gal2/3-double-null mice was equivalent to that in wild-type mice, whereas total protein sialylation was reduced by half. St3gal2/3-double-null mice were small, weak and short lived. They were half the weight of wild-type mice at weaning and displayed early hindlimb dysreflexia. We conclude that the St3gal2 and St3gal3 gene products (ST3Gal-II and ST3Gal-III sialyltransferases) are largely responsible for ganglioside terminal α2-3 sialylation in the brain, synthesizing the major brain gangliosides GD1a and GT1b.

  6. The Creation of a French Basic Nuclear Installation - Description of the Regulatory Process - 13293

    SciTech Connect

    Mahe, Carole; Leroy, Christine

    2013-07-01

    CEA is a French government-funded technological research organization. It has to build a medium-level waste interim storage facility because the geological repository will not be available until 2025. This interim storage facility, called DIADEM, has to be available in 2017. These wastes are coming from the research facilities for spent fuel reprocessing and the dismantling of the most radioactive parts of nuclear facilities. The CEA handles the waste management by inventorying the needs and updating them regularly. The conception of the facility is mainly based on this inventory. It provides quantity and characteristics of wastes and it gives the production schedule until 2035. Beyond mass and volume, main characteristics of these radioactive wastes are chemical nature, radioisotopes, radioactivity, radiation dose, the heat emitted, corrosive or explosive gas production, etc. These characteristics provide information to study the repository safety. DIADEM mainly consists of a concrete cell, isolated from the outside, wherein stainless steel welded containers are stored, stacked in a vertical position in the racks. DIADEM is scheduled to store three types of 8 mm-thick, stainless steel cylindrical containers with an outside diameter 498 mm and height from 620 to 2120 mm. DIADEM will be a basic nuclear installation (INB in French) because of overall activity of radioactive substances stored. The creation of a French basic nuclear installation is subject to authorization according to the French law No. 2006-686 of 13 June 2006 on Transparency and Security in the Nuclear Field. The authorization takes into account the technical and financial capacities of the licensee which must allow him to conduct his project in compliance with these interests, especially to cover the costs of decommissioning the installation and conduct remediation work, and to monitor and maintain its location site or, for radioactive waste disposal installations, to cover the definitive shut

  7. Acquired experience resulting from transforming a chemical installation into a nuclear one

    SciTech Connect

    Zamfirache, M.; Stefan, L.; Bornea, A.; Stefanescu, I.

    2015-03-15

    ICIT-Valcea has developed an experimental pilot-scale installation for tritium and deuterium separation. The main objective of this pilot was to demonstrate the water detritiation technology and to transfer this technology to the CANDU reactors of the Cernavoda nuclear power plant. The pilot-scale installation was initiated in 1992. The initial design and construction were performed similarly to chemical plants as the separation of isotopes was focused on only hydrogen and deuterium to assess feasibility. In a second phase we have begun to transform it into a nuclear facility with the aim of separating tritium. Moving to tritium separation has imposed a lot of changes. Changes consisted mainly of: -) re-design of the technological systems for nuclear material processing, applying specific codes and standards (ASME, Romanian nuclear specific pressure boundary prescriptions for code classification); -) design and implementation of new systems, classified as safety systems; -) re-design and implementation of command and control systems, complying with the requirements of reliability and maintenance required for the project promoted; -) revaluation of auxiliary systems (utilities, power supply); -) implementing radiation protection systems, including secondary barriers; -) implementing and maintaining environment operational program specific to the new nuclear plant; -) developing and conducting safety analyzes; and -) the production of specific documentation to obtain the necessary permits for construction, commissioning and operation of the plant.

  8. Childhood leukaemia risks: from unexplained findings near nuclear installations to recommendations for future research.

    PubMed

    Laurier, D; Grosche, B; Auvinen, A; Clavel, J; Cobaleda, C; Dehos, A; Hornhardt, S; Jacob, S; Kaatsch, P; Kosti, O; Kuehni, C; Lightfoot, T; Spycher, B; Van Nieuwenhuyse, A; Wakeford, R; Ziegelberger, G

    2014-09-01

    Recent findings related to childhood leukaemia incidence near nuclear installations have raised questions which can be answered neither by current knowledge on radiation risk nor by other established risk factors. In 2012, a workshop was organised on this topic with two objectives: (a) review of results and discussion of methodological limitations of studies near nuclear installations; (b) identification of directions for future research into the causes and pathogenesis of childhood leukaemia. The workshop gathered 42 participants from different disciplines, extending widely outside of the radiation protection field. Regarding the proximity of nuclear installations, the need for continuous surveillance of childhood leukaemia incidence was highlighted, including a better characterisation of the local population. The creation of collaborative working groups was recommended for consistency in methodologies and the possibility of combining data for future analyses. Regarding the causes of childhood leukaemia, major fields of research were discussed (environmental risk factors, genetics, infections, immunity, stem cells, experimental research). The need for multidisciplinary collaboration in developing research activities was underlined, including the prevalence of potential predisposition markers and investigating further the infectious aetiology hypothesis. Animal studies and genetic/epigenetic approaches appear of great interest. Routes for future research were pointed out.

  9. The high-temperature sodium coolant technology in nuclear power installations for hydrogen power engineering

    NASA Astrophysics Data System (ADS)

    Kozlov, F. A.; Sorokin, A. P.; Alekseev, V. V.; Konovalov, M. A.

    2014-05-01

    In the case of using high-temperature sodium-cooled nuclear power installations for obtaining hydrogen and for other innovative applications (gasification and fluidization of coal, deep petroleum refining, conversion of biomass into liquid fuel, in the chemical industry, metallurgy, food industry, etc.), the sources of hydrogen that enters from the reactor plant tertiary coolant circuit into its secondary coolant circuit have intensity two or three orders of magnitude higher than that of hydrogen sources at a nuclear power plant (NPP) equipped with a BN-600 reactor. Fundamentally new process solutions are proposed for such conditions. The main prerequisite for implementing them is that the hydrogen concentration in sodium coolant is a factor of 100-1000 higher than it is in modern NPPs taken in combination with removal of hydrogen from sodium by subjecting it to vacuum through membranes made of vanadium or niobium. Numerical investigations carried out using a diffusion model showed that, by varying such parameters as fuel rod cladding material, its thickness, and time of operation in developing the fuel rods for high-temperature nuclear power installations (HT NPIs) it is possible to exclude ingress of cesium into sodium through the sealed fuel rod cladding. However, if the fuel rod cladding loses its tightness, operation of the HT NPI with cesium in the sodium will be unavoidable. Under such conditions, measures must be taken for deeply purifying sodium from cesium in order to minimize the diffusion of cesium into the structural materials.

  10. Subunit profiling and functional characteristics of acetylcholine receptors in GT1-7 cells.

    PubMed

    Arai, Yuki; Ishii, Hirotaka; Kobayashi, Makito; Ozawa, Hitoshi

    2017-03-01

    GnRH neurons form a final common pathway for the central regulation of reproduction. Although the involvement of acetylcholine in GnRH secretion has been reported, direct effects of acetylcholine and expression profiles of acetylcholine receptors (AChRs) still remain to be studied. Using immortalized GnRH neurons (GT1-7 cells), we analyzed molecular expression and functionality of AChRs. Expression of the mRNAs were identified in the order α7 > β2 = β1 ≧ α4 ≧ α5 = β4 = δ > α3 for nicotinic acetylcholine receptor (nAChR) subunits and m4 > m2 for muscarinic acetylcholine receptor (mAChR) subtypes. Furthermore, this study revealed that α7 nAChRs contributed to Ca(2+) influx and GnRH release and that m2 and m4 mAChRs inhibited forskolin-induced cAMP production and isobutylmethylxanthine-induced GnRH secretion. These findings demonstrate the molecular profiles of AChRs, which directly contribute to GnRH secretion in GT1-7 cells, and provide one possible regulatory action of acetylcholine in GnRH neurons.

  11. Trip report: European Communities 1989 International Conference on Decommissioning of Nuclear Installations, Brussels, Belgium, October 24-27, 1989

    SciTech Connect

    Rankin, W.N.

    1989-01-01

    The European community is conducting research on the decommissioning of nuclear installations. The prime objective is to develop effective techniques to ensure the protection of man and his environment against the potential hazards of nuclear installations that have been shut down. The results of the 1979--1983 research program were presented in a conference held in Luxembourg. This program was primarily concerned with decommissioning nuclear power plants. The 1984--1988 program was extended to all types of nuclear installations. Fuel fabrication, enrichment and reprocessing plants, and research and development facilities having fulfilled their useful purposes are also awaiting decommissioning. This Program has produced numerous scientific and technical achievements. Great progress has in particular been achieved in the reduction of metal waste arising from decommissioning, due to advances in areas such as the development of aggressive decontamination procedures and of techniques for melting and recycling low-level radioactive waste metal.

  12. From the first nuclear power plant to fourth-generation nuclear power installations [on the 60th anniversary of the World's First nuclear power plant

    NASA Astrophysics Data System (ADS)

    Rachkov, V. I.; Kalyakin, S. G.; Kukharchuk, O. F.; Orlov, Yu. I.; Sorokin, A. P.

    2014-05-01

    Successful commissioning in the 1954 of the World's First nuclear power plant constructed at the Institute for Physics and Power Engineering (IPPE) in Obninsk signaled a turn from military programs to peaceful utilization of atomic energy. Up to the decommissioning of this plant, the AM reactor served as one of the main reactor bases on which neutron-physical investigations and investigations in solid state physics were carried out, fuel rods and electricity generating channels were tested, and isotope products were bred. The plant served as a center for training Soviet and foreign specialists on nuclear power plants, the personnel of the Lenin nuclear-powered icebreaker, and others. The IPPE development history is linked with the names of I.V. Kurchatov, A.I. Leipunskii, D.I. Blokhintsev, A.P. Aleksandrov, and E.P. Slavskii. More than 120 projects of various nuclear power installations were developed under the scientific leadership of the IPPE for submarine, terrestrial, and space applications, including two water-cooled power units at the Beloyarsk NPP in Ural, the Bilibino nuclear cogeneration station in Chukotka, crawler-mounted transportable TES-3 power station, the BN-350 reactor in Kazakhstan, and the BN-600 power unit at the Beloyarsk NPP. Owing to efforts taken on implementing the program for developing fast-neutron reactors, Russia occupied leading positions around the world in this field. All this time, IPPE specialists worked on elaborating the principles of energy supertechnologies of the 21st century. New large experimental installations have been put in operation, including the nuclear-laser setup B, the EGP-15 accelerator, the large physical setup BFS, the high-pressure setup SVD-2; scientific, engineering, and technological schools have been established in the field of high- and intermediate-energy nuclear physics, electrostatic accelerators of multicharge ions, plasma processes in thermionic converters and nuclear-pumped lasers, physics of compact

  13. Implementing Stakeholders' Access to Expertise: Experimenting on Nuclear Installations' Safety Cases - 12160

    SciTech Connect

    Gilli, Ludivine; Charron, Sylvie

    2012-07-01

    In 2009 and 2010, the Institute for Nuclear Safety and Radiation Protection (IRSN) led two pilot actions dealing with nuclear installations' safety cases. One concerned the periodical review of the French 900 MWe nuclear reactors, the other concerned the decommissioning of a workshop located on the site of Areva's La Hague fuel-reprocessing plant site in Northwestern France. The purpose of both these programs was to test ways for IRSN and a small number of stakeholders (Non-Governmental Organizations (NGOs) members, local elected officials, etc.) to engage in technical discussions. The discussions were intended to enable the stakeholders to review future applications and provide valuable input. The test cases confirmed there is a definite challenge in successfully opening a meaningful dialogue to discuss technical issues, in particular the fact that most expertise reports were not public and the conflict that exists between the contrary demands of transparency and confidentiality of information. The test case also confirmed there are ways to further improvement of stakeholders' involvement. (authors)

  14. Method of installing a control room console in a nuclear power plant

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  15. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    NASA Astrophysics Data System (ADS)

    Saleh, Lydia Ilaiza; Ryong, Kim Tae

    2015-04-01

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of this paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.

  16. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    SciTech Connect

    Saleh, Lydia Ilaiza Ryong, Kim Tae

    2015-04-29

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of this paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.

  17. The Contribution of Paleoseismology to Seismic Hazard Assessment in Site Evaluation for Nuclear Installations

    NASA Astrophysics Data System (ADS)

    Decker, Kurt; Guerrieri, Luca; Fukushima, Yoshimitsu

    2015-04-01

    In the framework of site evaluation/re-evaluation procedures for nuclear power plants (NPP), paleoseismology plays an essential role not only for Fault Displacement Hazard Assessment (FDHA) but also for Seismic Hazard Assessment (SHA). The relevance of paleoseismology is recommended in the reference IAEA Safety Guide (IAEA SSG-9) and has been dramatically confirmed in recent time especially after the accident at the Fukushima Daiichi NPP caused by the disastrous great Tohoku earthquake and tsunami occurred on 11 March 2011. After this event, the IAEA International Seismic Safety Center promoted a technical document aimed at encouraging and supporting Member States, especially from newcomer countries, to include paleoseismic investigations into the geologic database, highlighting the value of earthquake geology studies and paleoseismology for nuclear safety and providing standard methodologies to perform such investigations. In detail, paleoseismic investigations in the context of site evaluation of nuclear installations have the following main objectives: i) identification of seismogenic structures based on the recognition of effects of past earthquakes in the regional area; ii) improvement of the completeness of earthquake catalogs, through the identification and dating of ancient moderate to large earthquakes, whose trace has been preserved in the geologic records; iii) estimation of the maximum seismic potential associated with an identified seismogenic structure/source, typically on the basis of the amount of displacement per event (evaluable in paleoseismic trenches), as well as of the geomorphic and stratigraphic features interpretable as the cumulative effect of repeated large seismic events (concept of "seismic landscape"); iv) rough calibration of probabilistic seismic hazard assessment (PSHA), by using the recurrence interval of large earthquakes detectable by paleoseismic investigations, and providing a "reality check" based on direct observations of

  18. Susceptibility of GT1-7 cells to mouse-passaged field scrapie isolates with a long incubation.

    PubMed

    Miyazawa, Kohtaro; Okada, Hiroyuki; Iwamaru, Yoshifumi; Masujin, Kentaro; Yokoyama, Takashi

    2014-01-01

    A typical feature of scrapie in sheep and goats is the accumulation of disease-associated prion protein. Scrapie consists of many strains with different biological properties. Nine natural sheep scrapie cases were transmitted to wild-type mice and mouse-passaged isolates were classified into 2 types based on incubation time: short and long. These 2 types displayed a distinct difference in their pathology. We attempted to transmit these mouse-passaged isolates to 2 murine cell lines (GT1-7 and L929) to compare their properties. All of the isolates were transmitted to L929 cells. However, only mouse-passaged field isolates with a long incubation time were transmitted to GT1-7 cells. This specific susceptibility of GT1-7 cells was also confirmed with a primary-passaged isolate that was not completely adapted to the new host species. Characterization of the mechanisms of the specific susceptibility of GT1-7 cells to isolates with a long incubation time may lead to a greater understanding of the differences among prion strains.

  19. Double copper sheath multiconductor instrumentation cable is durable and easily installed in high thermal or nuclear radiation area

    NASA Technical Reports Server (NTRS)

    Mc Crae, A. W., Jr.

    1967-01-01

    Multiconductor instrumentation cable in which the conducting wires are routed through two concentric copper tube sheaths, employing a compressed insulator between the conductors and between the inner and outer sheaths, is durable and easily installed in high thermal or nuclear radiation area. The double sheath is a barrier against moisture, abrasion, and vibration.

  20. [Effects of nitriles and amides on the growth and the nitrile hydratase activity of the Rhodococcus sp. strain gt1].

    PubMed

    Maksimov, A Iu; Kuznetsova, M V; Ovechkina, G V; Kozlov, S V; Maksimova, Iu G; Demakov, V A

    2003-01-01

    Effects of some nitriles and amides, as well as glucose and ammonium, on the growth and the nitrile hydratase (EC 4.2.1.84) activity of the Rhodococcus sp. strain gt1 isolated from soil were studied. The activity of nitrile hydratase mainly depended on carbon and nitrogen supply to cells. The activity of nitrile hydratase was high in the presence of glucose and ammonium at medium concentrations and decreased at concentrations of glucose more than 0.3%. Saturated unsubstituted aliphatic nitriles and amides were found to be a good source of nitrogen and carbon. However, the presence of nitriles and amides in the medium was not absolutely necessary for the expression of the activity of nitrile hydratase isolated from the Rhodococcus sp. strain gt1.

  1. Scrapie protein degradation by cysteine proteases in CD11c+ dendritic cells and GT1-1 neuronal cells.

    PubMed

    Luhr, Katarina M; Nordström, Elin K; Löw, Peter; Ljunggren, Hans-Gustaf; Taraboulos, Albert; Kristensson, Krister

    2004-05-01

    Dendritic cells (DC) of the CD11c(+) myeloid phenotype have been implicated in the spread of scrapie in the host. Previously, we have shown that CD11c(+) DC can cause a rapid degradation of proteinase K-resistant prion proteins (PrP(Sc)) in vitro, indicating a possible role of these cells in the clearance of PrP(Sc). To determine the mechanisms of PrP(Sc) degradation, CD11c(+) DC that had been exposed to PrP(Sc) derived from a neuronal cell line (GT1-1) infected with scrapie (ScGT1-1) were treated with a battery of protease inhibitors. Following treatment with the cysteine protease inhibitors (2S,3S)-trans-epoxysuccinyl-L-leucylamido-3-methylbutane (E-64c), its ethyl ester (E-64d), and leupeptin, the degradation of PrP(Sc) was inhibited, while inhibitors of serine and aspartic and metalloproteases (aprotinin, pepstatin, and phosphoramidon) had no effect. An endogenous degradation of PrP(Sc) in ScGT1-1 cells was revealed by inhibiting the expression of cellular PrP (PrP(C)) by RNA interference, and this degradation could also be inhibited by the cysteine protease inhibitors. Our data show that PrP(Sc) is proteolytically cleaved preferentially by cysteine proteases in both CD11c(+) DC and ScGT1-1 cells and that the degradation of PrP(Sc) by proteases is different from that of PrP(C). Interference by protease inhibitors with DC-induced processing of PrP(Sc) has the potential to modify prion spread, clearance, and immunization in a host.

  2. Fault displacement hazard assessment for nuclear installations based on IAEA safety standards

    NASA Astrophysics Data System (ADS)

    Fukushima, Y.

    2016-12-01

    In the IAEA Safety NS-R-3, surface fault displacement hazard assessment (FDHA) is required for the siting of nuclear installations. If any capable faults exist in the candidate site, IAEA recommends the consideration of alternative sites. However, due to the progress in palaeoseismological investigations, capable faults may be found in existing site. In such a case, IAEA recommends to evaluate the safety using probabilistic FDHA (PFDHA), which is an empirical approach based on still quite limited database. Therefore a basic and crucial improvement is to increase the database. In 2015, IAEA produced a TecDoc-1767 on Palaeoseismology as a reference for the identification of capable faults. Another IAEA Safety Report 85 on ground motion simulation based on fault rupture modelling provides an annex introducing recent PFDHAs and fault displacement simulation methodologies. The IAEA expanded the project of FDHA for the probabilistic approach and the physics based fault rupture modelling. The first approach needs a refinement of the empirical methods by building a world wide database, and the second approach needs to shift from kinematic to the dynamic scheme. Both approaches can complement each other, since simulated displacement can fill the gap of a sparse database and geological observations can be useful to calibrate the simulations. The IAEA already supported a workshop in October 2015 to discuss the existing databases with the aim of creating a common worldwide database. A consensus of a unified database was reached. The next milestone is to fill the database with as many fault rupture data sets as possible. Another IAEA work group had a WS in November 2015 to discuss the state-of-the-art PFDHA as well as simulation methodologies. Two groups jointed a consultancy meeting in February 2016, shared information, identified issues, discussed goals and outputs, and scheduled future meetings. Now we may aim at coordinating activities for the whole FDHA tasks jointly.

  3. The analysis of metal melting application in the management of metallic radioactive materials arising from decommissioning of nuclear installations

    SciTech Connect

    Slimak, Andrej; Necas, Vladimir

    2013-07-01

    Basic characterization of the waste management process during decommissioning of nuclear installations is described in the presented paper. A brief description is given of conditional and unconditional release of materials into the environment. The paper deals also with metal melting as prospective decontamination technique which can significantly reduce metallic radioactive waste. The material and radioactivity flow in the decommissioning process should be followed using the integrated material flow tool that is implemented into the standardized analytical decommissioning parameters calculation code OMEGA. Applying the integrated material flow tool, it is possible to monitor radiological and physical properties of individual material items listed in the nuclear installation input database, from dismantling up to their release into the environment or disposal in repository. Using the OMEGA code and two model databases, several scenarios related to metal melting are evaluated. The impact of applying different input decommissioning parameters on the metal distribution is the main result discussed in the paper. (authors)

  4. Regulation of GNRH production by estrogen and bone morphogenetic proteins in GT1-7 hypothalamic cells.

    PubMed

    Otani, Hiroyuki; Otsuka, Fumio; Takeda, Masaya; Mukai, Tomoyuki; Terasaka, Tomohiro; Miyoshi, Tomoko; Inagaki, Kenichi; Suzuki, Jiro; Ogura, Toshio; Lawson, Mark A; Makino, Hirofumi

    2009-10-01

    Recent studies have shown that bone morphogenetic proteins (BMPs) are important regulators in the pituitary-gonadal endocrine axis. We here investigated the effects of BMPs on GNRH production controlled by estrogen using murine GT1-7 hypothalamic neuron cells. GT1-7 cells expressed estrogen receptor alpha (ERalpha; ESR1 as listed in MGI Database), ERbeta (ESR2 as listed in MGI Database), BMP receptors, SMADs, and a binding protein follistatin. Treatment with BMP2 and BMP4 had no effect on Gnrh mRNA expression; however, BMP6 and BMP7 significantly increased Gnrh mRNA expression as well as GnRH production by GT1-7 cells. Notably, the reduction of Gnrh expression caused by estradiol (E(2)) was restored by cotreatment with BMP2 and BMP4, whereas it was not affected by BMP6 or BMP7. E(2) activated extracellular signal-regulated kinase (ERK) 1/2 and stress-activated protein kinase/c-Jun NH(2)-terminal kinase (SAPK/JNK) signaling but did not activate p38-mitogen-activated protein kinase (MAPK) signaling in GT1-7 cells. Inhibition of ERK1/ERK2 reversed the inhibitory effect of estrogen on Gnrh expression, whereas SAPK/JNK inhibition did not affect the E(2) actions. Expression levels of Eralpha and Erbeta were reduced by BMP2 and BMP4, but were increased by BMP6 and BMP7. Treatment with an ER antagonist inhibited the E(2) effects on Gnrh suppression including reduction of E(2)-induced ERK phosphorylation, suggesting the involvement of genomic ER actions in Gnrh suppression. BMP2 and BMP4 also suppressed estrogen-induced phosphorylation of ERK1/ERK2 and SAPK/JNK signaling, suggesting that BMP2 and BMP4 downregulate estrogen effects by attenuating ER-MAPK signaling. Considering that BMP6 and BMP7 increased the expression of alpha1E-subunit of R-type calcium channel (Cacna1e), which is critical for GNRH secretion, it is possible that BMP6 and BMP7 directly stimulate GNRH release by GT1-7 cells. Collectively, a newly uncovered interaction of BMPs and ER may be involved in

  5. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    SciTech Connect

    Miller, M.H.

    1995-04-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT{trademark} Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS.

  6. Electrokinetic and electrostatic properties of bilayers containing gangliosides GM1, GD1a, or GT1. Comparison with a nonlinear theory.

    PubMed Central

    McDaniel, R V; Sharp, K; Brooks, D; McLaughlin, A C; Winiski, A P; Cafiso, D; McLaughlin, S

    1986-01-01

    We formed vesicles from mixtures of egg phosphatidylcholine (PC) and the gangliosides GM1, GD1a, or GT1 to model the electrokinetic properties of biological membranes. The electrophoretic mobilities of the vesicles are similar in NaCl, CsCl, and TMACl solutions, suggesting that monovalent cations do not bind significantly to these gangliosides. If we assume the sialic acid groups on the gangliosides are located some distance from the surface of the vesicle and the sugar moieties exert hydrodynamic drag, we can describe the mobility data in 1, 10, and 100 mM monovalent salt solutions with a combination of the Navier-Stokes and nonlinear Poisson-Boltzmann equations. The values we assume for the thickness of the ganglioside head group and the location of the charge affect the theoretical predictions markedly, but the Stokes radius of each sugar and the location of the hydrodynamic shear plane do not. We obtain a reasonable fit to the mobility data by assuming that all ganglioside head groups project 2.5 nm from the bilayer and all fixed charges are in a plane 1 nm from the bilayer surface. We tested the latter assumption by estimating the surface potentials of PC/ganglioside bilayers using four techniques: we made 31P nuclear magnetic resonance, fluorescence, electron spin resonance, and conductance measurements. The results are qualitatively consistent with our assumption. PMID:3697476

  7. Chronic exposure to KATP channel openers results in attenuated glucose sensing in hypothalamic GT1-7 neurons.

    PubMed

    Haythorne, Elizabeth; Hamilton, D Lee; Findlay, John A; Beall, Craig; McCrimmon, Rory J; Ashford, Michael L J

    2016-12-01

    Individuals with Type 1 diabetes (T1D) are often exposed to recurrent episodes of hypoglycaemia. This reduces hormonal and behavioural responses that normally counteract low glucose in order to maintain glucose homeostasis, with altered responsiveness of glucose sensing hypothalamic neurons implicated. Although the molecular mechanisms are unknown, pharmacological studies implicate hypothalamic ATP-sensitive potassium channel (KATP) activity, with KATP openers (KCOs) amplifying, through cell hyperpolarization, the response to hypoglycaemia. Although initial findings, using acute hypothalamic KCO delivery, in rats were promising, chronic exposure to the KCO NN414 worsened the responses to subsequent hypoglycaemic challenge. To investigate this further we used GT1-7 cells to explore how NN414 affected glucose-sensing behaviour, the metabolic response of cells to hypoglycaemia and KATP activity. GT1-7 cells exposed to 3 or 24 h NN414 exhibited an attenuated hyperpolarization to subsequent hypoglycaemic challenge or NN414, which correlated with diminished KATP activity. The reduced sensitivity to hypoglycaemia was apparent 24 h after NN414 removal, even though intrinsic KATP activity recovered. The NN414-modified glucose responsiveness was not associated with adaptations in glucose uptake, metabolism or oxidation. KATP inactivation by NN414 was prevented by the concurrent presence of tolbutamide, which maintains KATP closure. Single channel recordings indicate that NN414 alters KATP intrinsic gating inducing a stable closed or inactivated state. These data indicate that exposure of hypothalamic glucose sensing cells to chronic NN414 drives a sustained conformational change to KATP, probably by binding to SUR1, that results in loss of channel sensitivity to intrinsic metabolic factors such as MgADP and small molecule agonists.

  8. Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361

    SciTech Connect

    Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike; Daniska, Vladimir

    2013-07-01

    The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

  9. Energy: towards nuclear breeder installations before the end of this century?

    NASA Astrophysics Data System (ADS)

    Dautray, Robert; Friedel, Jacques

    2007-01-01

    To play an essential role in the energy crisis, the civilian nuclear fission industry urgently requires a large and safe underground deposit for irradiated materials. Breeder reactors should be required to extract more energy, not to eventually reduce the radioactivity of dangerous materials. These two aims still require much work, from the fundamental issue of the mechanics of materials, to large industrial parks for breeder development on an international basis. To cite this article: R. Dautray, J. Friedel, C. R. Mecanique 335 (2007).

  10. Installation and evaluation of a nuclear power plant Operator Advisor based on artificial intelligence technology

    SciTech Connect

    Hajek, B.K.; Miller, D.W.

    1993-02-01

    The Artificial Intelligence Group in the Nuclear Engineering Program has designed and built an Operator Advisor (OA), an AI system to monitor nuclear power plant parameters, detect component and system malfunctions, dispose their causes, and provide the plant operators with the correct procedures for mitigating the consequences of the malfunctions. It then monitors performance of the procedures, and provides backup steps when specific operator actions fail. The OA has been implemented on Sun 4 workstations in Common Lisp, and has been interfaced to run in real time on the Perry Nuclear Power Plant full-function simulator in the plant training department. The eventual goal for a fully functioning Operator Advisor would be to have reactor operators receive direction for all plant operations. Such a goal requires considerable testing of the system within limited malfunction boundaries, an extensive Verification Validation (V V) effort, a large knowledge base development effort, and development of tools as part of the system to automate its maintenance. Clearly, these efforts are beyond the scope of the feasibility effort expended during this project period. However, as a result of this project, we have an AI based platform upon which a complete system can be built.

  11. Over-expression of a putative poplar glycosyltransferase gene, PtGT1, in tobacco increases lignin content and causes early flowering

    PubMed Central

    Wang, Yan-Wen; Wang, Wen-Chao; Jin, Shang-Hui; Wang, Jun; Wang, Bo; Hou, Bing-Kai

    2012-01-01

    Family 1 glycosyltransferases catalyse the glycosylation of small molecules and play an important role in maintaining cell homeostasis and regulating plant growth and development. In this study, a putative glycosyltransferase gene of family 1, PtGT1, was cloned from poplar (Populus tomentosa Carr.). Sequence analysis showed that this gene encodes a protein of 481 amino acid residues with a conserved PSPG box at its C-terminal, suggesting that it is active in the glycosylation of plant secondary products. The PtGT1 gene was expressed in poplar stems and leaves, with a particularly high expression level in elongating stems. Transgenic tobacco plants ectopically over-expressing PtGT1 were obtained and phenotypes were analysed. Wiesner and Mäule staining showed that stem xylem of transgenic tobacco plants stained more strongly than controls. Measurement of the Klason lignins showed much higher lignin content in the transgenic lines than in control plants. Furthermore, the ectopic over-expression of PtGT1 in tobacco resulted in an early flowering phenotype. These findings offer a possible starting point towards better understanding of the function of poplar PtGT1, and provide a novel strategy for lignin engineering and flowering control in plants through the genetic manipulation of a poplar glycosyltransferase gene. PMID:22268132

  12. Crystal Structure of Botulinum Neurotoxin Type a in Complex With the Cell Surface Co-Receptor GT1b-Insight Into the Toxin-Neuron Interaction

    SciTech Connect

    Stenmark, P.; Dupuy, J.; Inamura, A.; Kiso, M.; Stevens, R.C.

    2009-05-26

    Botulinum neurotoxins have a very high affinity and specificity for their target cells requiring two different co-receptors located on the neuronal cell surface. Different toxin serotypes have different protein receptors; yet, most share a common ganglioside co-receptor, GT1b. We determined the crystal structure of the botulinum neurotoxin serotype A binding domain (residues 873-1297) alone and in complex with a GT1b analog at 1.7 A and 1.6 A, respectively. The ganglioside GT1b forms several key hydrogen bonds to conserved residues and binds in a shallow groove lined by Tryptophan 1266. GT1b binding does not induce any large structural changes in the toxin; therefore, it is unlikely that allosteric effects play a major role in the dual receptor recognition. Together with the previously published structures of botulinum neurotoxin serotype B in complex with its protein co-receptor, we can now generate a detailed model of botulinum neurotoxin's interaction with the neuronal cell surface. The two branches of the GT1b polysaccharide, together with the protein receptor site, impose strict geometric constraints on the mode of interaction with the membrane surface and strongly support a model where one end of the 100 A long translocation domain helix bundle swing into contact with the membrane, initiating the membrane anchoring event.

  13. Instrumentation report 1: specification, design, calibration, and installation of instrumentation for an experimental, high-level, nuclear waste storage facility

    SciTech Connect

    Brough, W.G.; Patrick, W.C.

    1982-01-01

    The Spent Fuel Test-Climax (SFT-C) is being conducted 420 m underground at the Nevada Test Site under the auspices of the US Department of Energy. The test facility houses 11 spent fuel assemblies from an operating commercial nuclear reactor and numerous other thermal sources used to simulate the near-field effects of a large repository. We developed a large-scale instrumentation plan to ensure that a sufficient quality and quantity of data were acquired during the three- to five-year test. These data help satisfy scientific, operational, and radiation safety objectives. Over 800 data channels are being scanned to measure temperature, electrical power, radiation, air flow, dew point, stress, displacement, and equipment operation status (on/off). This document details the criteria, design, specifications, installation, calibration, and current performance of the entire instrumentation package.

  14. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    SciTech Connect

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.; Samoilov, V.N.; Shestakov, B.A.; Duncan, C.; Brownell, L.; Carbonaro, J.; White, R.M.; Coffing, J.A.

    2009-07-12

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Department of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.

  15. ECAT ART - a continuously rotating PET camera: performance characteristics, initial clinical studies, and installation considerations in a nuclear medicine department.

    PubMed

    Bailey, D L; Young, H; Bloomfield, P M; Meikle, S R; Glass, D; Myers, M J; Spinks, T J; Watson, C C; Luk, P; Peters, A M; Jones, T

    1997-01-01

    Advances in fully three-dimensional (3D) image reconstruction techniques have permitted the development of a commercial, rotating, partial ring, fully 3D positron emission tomographic (PET) scanner, the ECAT ART. The system has less than one-half the number of bismuth germanate detectors compared with a full ring scanner with the equivalent field of view, resulting in reduced capital cost. The performance characteristics, implications for installation in a nuclear medicine department, and clinical utility of the scanner are presented in this report. The sensitivity (20 cm diameterx20 cm long cylindrical phantom, no scatter correction) is 11400 cps.kBq-1.ml-1. This compares with 5800 and 40500 cps.kBq-1.ml-1 in 2D and 3D respectively for the equivalent full ring scanner (ECAT EXACT). With an energy window of 350-650 keV the maximum noise equivalent count (NEC) rate was 27 kcps at a radioactivity concentration of approximately 15 kBq.ml-1 in the cylinder. Spatial resolution is approximately 6 mm full width at half maximum on axis degrading to just under 8 mm at a distance of 20 cm off axis. Installation and use within the nuclear medicine department does not appreciably increase background levels of radiation on gamma cameras in adjacent rooms and the dose rate to an operator in the same room is 2 microSv. h-1 for a typical fluorine-18 fluorodeoxyglucose (18F-FDG) study with an initial injected activity of 370 MBq. The scanner has been used for clinical imaging with18F-FDG for neurological and oncological applications. Its novel use for imaging iron-52 transferrin for localising erythropoietic activity demonstrates its sensitivity and resolution advantages over a conventional dual-headed gamma camera. The ECAT ART provides a viable alternative to conventional full ring PET scanners without compromising the performance required for clinical PET imaging.

  16. Evaluation of 20 years of environmental monitoring data around Swedish nuclear installations.

    PubMed

    Wallberg, Petra; Moberg, Leif

    2002-01-01

    Twenty years of environmental monitoring data around the Swedish nuclear power plants and the Studsvik research facilities have been evaluated. In the marine environment, Fucus vesiculosus generally has high activity concentrations and the presence of a large variety of radionuclides in comparison with other bioindicators. However, for single nuclides the detection frequency was higher for 110mAg in Littorina spp and for 152Eu in Macoma baltica in comparison with other bioindicators. Close to the discharge point the activity concentration of 60Co in F. vesiculosus and in the discharge water were correlated. In the terrestrial environment, few radionuclides were detected and the activity concentrations were generally low. Of the terrestrial indicators, mosses had the highest activity concentrations and also comprised the largest variety of radionuclides. The radiation doses to humans based on measurements of released activity were small. Based on the results from the evaluation, alternative sampling strategies for the monitoring program are discussed.

  17. Installation and evaluation of a nuclear power plant operator advisor based on artificial intelligence technology. Interim progress report and second year development plan

    SciTech Connect

    Hajek, B.K.; Miller, D.W.

    1989-06-20

    This report discusses the following topics on a Nuclear Power Plant operator advisor based on artificial Intelligence Technology; Workstation conversion; Software Conversion; V&V Program Development Development; Simulator Interface Development; Knowledge Base Expansion; Dynamic Testing; Database Conversion; Installation at the Perry Simulator; Evaluation of Operator Interaction; Design of Man-Machine Interface; and Design of Maintenance Facility.

  18. Metabolic Thresholds and Validated Accelerometer Cutoff Points for the Actigraph GT1M in Young Children Based on Measurements of Locomotion and Play Activities

    ERIC Educational Resources Information Center

    Jimmy, Gerda; Dossegger, Alain; Seiler, Roland; Mader, Urs

    2012-01-01

    The purpose of the current study was to determine metabolic thresholds and subsequent activity intensity cutoff points for the ActiGraph GT1M with various epochs spanning from 5 to 60 sec in young children. Twenty-two children, aged 4 to 9 years, performed 10 different activities including locomotion and play activities. Energy expenditure was…

  19. Metabolic Thresholds and Validated Accelerometer Cutoff Points for the Actigraph GT1M in Young Children Based on Measurements of Locomotion and Play Activities

    ERIC Educational Resources Information Center

    Jimmy, Gerda; Dossegger, Alain; Seiler, Roland; Mader, Urs

    2012-01-01

    The purpose of the current study was to determine metabolic thresholds and subsequent activity intensity cutoff points for the ActiGraph GT1M with various epochs spanning from 5 to 60 sec in young children. Twenty-two children, aged 4 to 9 years, performed 10 different activities including locomotion and play activities. Energy expenditure was…

  20. Identification and characterisation of F3GT1 and F3GGT1, two glycosyltransferases responsible for anthocyanin biosynthesis in red-fleshed kiwifruit (Actinidia chinensis).

    PubMed

    Montefiori, Mirco; Espley, Richard V; Stevenson, David; Cooney, Janine; Datson, Paul M; Saiz, Anna; Atkinson, Ross G; Hellens, Roger P; Allan, Andrew C

    2011-01-01

    Much of the diversity of anthocyanins is due to the action of glycosyltransferases, which add sugar moieties to anthocyanidins. We identified two glycosyltransferases, F3GT1 and F3GGT1, from red-fleshed kiwifruit (Actinidia chinensis) that perform sequential glycosylation steps. Red-fleshed genotypes of kiwifruit accumulate anthocyanins mainly in the form of cyanidin 3-O-xylo-galactoside. Genes in the anthocyanin and flavonoid biosynthetic pathway were identified and shown to be expressed in fruit tissue. However, only the expression of the glycosyltransferase F3GT1 was correlated with anthocyanin accumulation in red tissues. Recombinant enzyme assays in vitro and in vivo RNA interference (RNAi) demonstrated the role of F3GT1 in the production of cyanidin 3-O-galactoside. F3GGT1 was shown to further glycosylate the sugar moiety of the anthocyanins. This second glycosylation can affect the solubility and stability of the pigments and modify their colour. We show that recombinant F3GGT1 can catalyse the addition of UDP-xylose to cyanidin 3-galactoside. While F3GGT1 is responsible for the end-product of the pathway, F3GT1 is likely to be the key enzyme regulating the accumulation of anthocyanin in red-fleshed kiwifruit varieties.

  1. Differential protein expression profile in the hypothalamic GT1-7 cell line after exposure to anabolic androgenic steroids

    PubMed Central

    Martínez-Rivera, Freddyson J.; Pérez-Laspiur, Juliana; Santiago-Gascot, María E.; Alemán-Reyes, Abner G.; García-Santiago, Emanuel; Rodríguez-Pérez, Yolanda; Calo-Guadalupe, Cristhian; Otero-Pagán, Inelia; Ayala-Pagán, Roxsana N.; Martínez, Magdiel; Cantres-Rosario, Yisel M.; Meléndez, Loyda M.; Barreto-Estrada, Jennifer L.

    2017-01-01

    The abuse of anabolic androgenic steroids (AAS) has been considered a major public health problem during decades. Supraphysiological doses of AAS may lead to a variety of neuroendocrine problems. Precisely, the hypothalamic-pituitary-gonadal (HPG) axis is one of the body systems that is mainly influenced by steroidal hormones. Fluctuations of the hormonal milieu result in alterations of reproductive function, which are made through changes in hypothalamic neurons expressing gonadotropin-releasing hormone (GnRH). In fact, previous studies have shown that AAS modulate the activity of these neurons through steroid-sensitive afferents. To increase knowledge about the cellular mechanisms induced by AAS in GnRH neurons, we performed proteomic analyses of the murine hypothalamic GT1-7 cell line after exposure to 17α-methyltestosterone (17α-meT; 1 μM). These cells represent a good model for studying regulatory processes because they exhibit the typical characteristics of GnRH neurons, and respond to compounds that modulate GnRH in vivo. Two-dimensional difference in gel electrophoresis (2D-DIGE) and mass spectrometry analyses identified a total of 17 different proteins that were significantly affected by supraphysiological levels of AAS. Furthermore, pathway analyses showed that modulated proteins were mainly associated to glucose metabolism, drug detoxification, stress response and cell cycle. Validation of many of these proteins, such as GSTM1, ERH, GAPDH, PEBP1 and PDIA6, were confirmed by western blotting. We further demonstrated that AAS exposure decreased expression of estrogen receptors and GnRH, while two important signaling pathway proteins p-ERK, and p-p38, were modulated. Our results suggest that steroids have the capacity to directly affect the neuroendocrine system by modulating key cellular processes for the control of reproductive function. PMID:28719635

  2. Cholesterol secoaldehyde, an ozonation product of cholesterol, induces amyloid aggregation and apoptosis in murine GT1-7 hypothalamic neurons.

    PubMed

    Sathishkumar, K; Xi, Xiaochun; Martin, Roy; Uppu, Rao M

    2007-06-01

    Aldehydic products from ozonation of cholesterol and peroxidation of phospholipids have been shown to accelerate aggregation of amyloid-beta (Abeta) in vitro. Here, we show that 3beta-hydroxy-5-oxo-5,6-secocholestan-6-al (ChSeco), an ozonation product of cholesterol, induces Abeta aggregation, generation of reactive oxygen species (ROS), and cytotoxicity in murine GT1-7 hypothalamic neurons. The formation of Abeta aggregates in situ was dose-dependent at ChSeco concentrations ranging from 1 to 20 microM. The increase in insoluble Abeta aggregates at increasing concentrations of ChSeco was accompanied by a decrease in soluble Abeta as evidenced by Western blot analysis. The formation of ROS in neuronal cells was found to be dose- and time-dependent with the magnitude being higher at 20 microM compared to 10 microM ChSeco or untreated controls. The increase in ROS was associated with depletion of GSH. The cytotoxicity induced by ChSeco involved changes in phosphatidylserine translocation, DNA fragmentation, and caspase 3/7 activity that are characteristic of apoptosis. Pretreatment of neuronal cells with Trolox, a water-soluble analog of alpha-tocopherol offered partial, but significant protection against ChSeco-induced cell death, whereas, N-acetyl-L-cysteine (NAC) completely prevented the cytotoxic effects of ChSeco. NAC and Trolox were without any effects on ChSeco-induced Abeta aggregation. Fibrillogenesis inhibitors, which inhibited Abeta aggregation, did not inhibit cell death induced by ChSeco, implying that ROS generation, and not Abeta aggregation, plays a major role in the observed cytotoxicity. However, since Alzheimer's and other neurodegenerative diseases are slow and progressive, the formation of Abeta aggregates in vivo by ChSeco may have long-term pathological consequences.

  3. Glutamate increases toxicity of inorganic lead in GT1-7 neurons: partial protection induced by flunarizine.

    PubMed

    Loikkanen, Jarkko; Naarala, Jonne; Vähäkangas, Kirsi H; Savolainen, Kai M

    2003-12-01

    Recent studies point to an interaction between the glutamatergic neurotransmitter system and inorganic lead (Pb) neurotoxicity. Pb (1-100 microM) evoked cytotoxicity over the period of 72 h in mouse hypothalamic GT1-7 neurons. Glutamate (0.1 or 1 mM) on its own did not have any effect on cell viability. However, 1 mM glutamate clearly increased Pb-induced cell death at 48 and 72 h. Although flunarizine (0.1-10 microM), an antagonist of L- and T-type voltage-sensitive calcium channels (VSCCs), partially protected from the cytotoxicity induced by co-exposure to Pb (10 or 100 micro M) and glutamate (1 mM), it had no protective effect on cytotoxicity induced by Pb alone. The flunarizine-induced protection was dependent on time and observed only at 48 h. Neither verapamil, an antagonist of L-type VSCCs, nor DIDS, an inhibitor of anion exchange, at non-toxic concentrations (0.1-10 microM) had any effect on cytotoxicity induced by Pb alone or together with glutamate at any studied time point. Co-exposure to Pb and glutamate also resulted in more prominent production of reactive oxygen species (ROS) than either of the compounds alone. Interestingly, we observed an increase in intracellular glutathione (GSH) levels in cells exposed to micromolar concentrations of Pb. Glutamate decreased the levels of intracellular GSH and also partially reduced the Pb-induced increase in GSH levels. These results suggest that the interaction of glutamate and Pb results in increased neuronal cell death via mechanisms that involve an increase in ROS production, a decrease in intracellular GSH defense against oxidative stress and probably T-type VSCCs.

  4. Digital Full-Scope Simulation of a Conventional Nuclear Power Plant Control Room, Phase 2: Installation of a Reconfigurable Simulator to Support Nuclear Plant Sustainability

    SciTech Connect

    Ronald L. Boring; Vivek Agarwal; Kirk Fitzgerald; Jacques Hugo; Bruce Hallbert

    2013-03-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator is also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.

  5. Comparing the acceptor promiscuity of a Rosa hybrida glucosyltransferase RhGT1 and an engineered microbial glucosyltransferase OleD(PSA) toward a small flavonoid library.

    PubMed

    Wang, Lu; Han, Weiqing; Xie, Chenying; Hou, Jingli; Fang, Qinghong; Gu, Jianchun; Wang, Peng George; Cheng, Jiansong

    2013-03-07

    Glycosylation is a widespread modification of plant secondary metabolites, and catalyzed by a superfamily of enzymes called UDP-glycosyltransferases (UGTs). UGTs are often involved in late biosynthetic steps and show broad substrate specificity or regioselectivity. In this study, the acceptor promiscuity of a Rosa hybrid UGT RhGT1 and an evolved microbial UGT OleD(PSA) toward a small flavonoid library was probed and compared. Interestingly, RhGT1 showed comparable acceptor promiscuity in comparison with OleD(PSA), though the acceptor binding pocket of the latter is much more open and large. This clearly indicates that stabilization of the acceptor position by suitable hydrophobic interactions is important for the specificity or regioselectivity determination as well as overall fit of the acceptor into a 'big enough' binding pocket. This also poses a challenge for structure-based UGT engineering to alter the glucosylation pattern of flavonoids. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. Estrogen inhibition of norepinephrine responsiveness is initiated at the plasma membrane of GnRH-producing GT1-7 cells.

    PubMed

    Morales, Araceli; Gonzalez, Miriam; Marin, Raquel; Diaz, Mario; Alonso, Rafael

    2007-07-01

    The modulatory action of estradiol (E2) on the GnRH network can be exerted indirectly on presynaptic neurons or directly on estrogen receptors (ERs) located within GnRH hypothalamic neurons. Using the GnRH-producing GT1-7 cell line, we have investigated whether E2 is able to modify the response of these cells to norepinephrine (NE) stimulation. A 48-h exposure of GT1-7 cells to 10 nM E2 reduced NE-induced cAMP accumulation. However, 15-min exposure was enough to induce this inhibitory action, provided that a hormone-free period of 48 h after steroid treatment was allowed. Furthermore, this effect was mimicked by E2 coupled to (E-BSA), indicating that it may be exerted through a membrane-mediated mechanism. In addition, competition experiments using E-BSA coupled to fluorescein isothiocyanate (FITC) revealed the presence of cell membrane-binding sites for E2. Binding of E-BSA coupled to FITC was blocked by preincubation of cells with either E2, antiestrogen ICI 182 780, or tamoxifen. Moreover, fluorescence staining of non-permeabilized cells with antibodies against receptors alpha and beta confirmed the presence of both receptor subtypes at the cell membrane. To determine the nature of the ER involved in this response, specific agonists for ERalpha 4,4',4''-(4-propyl-[1H]pyrazole-1,3,5-triyl)tris-phenol (PPT) and ERbeta 2,3-bis(4-hydroxyphenyl)-propionitrile (DPN) were used. Since PPT, but not DPN, reproduced the effect of E2, it is suggested that estrogen-induced modulatory action on NE responsiveness was mediated by the ERalpha isoform. Taken together, these results indicate that E2 modulates the adrenergic sensitivity of GT1-7 cells by a mechanism compatible with the activation of membrane-associated ERs.

  7. Mutual interaction of kisspeptin, estrogen and bone morphogenetic protein-4 activity in GnRH regulation by GT1-7 cells.

    PubMed

    Terasaka, Tomohiro; Otsuka, Fumio; Tsukamoto, Naoko; Nakamura, Eri; Inagaki, Kenichi; Toma, Kishio; Ogura-Ochi, Kanako; Glidewell-Kenney, Christine; Lawson, Mark A; Makino, Hirofumi

    2013-12-05

    Reproduction is integrated by interaction of neural and hormonal signals converging on hypothalamic neurons for controlling gonadotropin-releasing hormone (GnRH). Kisspeptin, the peptide product of the kiss1 gene and the endogenous agonist for the GRP54 receptor, plays a key role in the regulation of GnRH secretion. In the present study, we investigated the interaction between kisspeptin, estrogen and BMPs in the regulation of GnRH production by using mouse hypothalamic GT1-7 cells. Treatment with kisspeptin increased GnRH mRNA expression and GnRH protein production in a concentration-dependent manner. The expression levels of kiss1 and GPR54 were not changed by kisspeptin stimulation. Kisspeptin induction of GnRH was suppressed by co-treatment with BMPs, with BMP-4 action being the most potent for suppressing the kisspeptin effect. The expression of kisspeptin receptor, GPR54, was suppressed by BMPs, and this effect was reversed in the presence of kisspeptin. It was also revealed that BMP-induced Smad1/5/8 phosphorylation and Id-1 expression were suppressed and inhibitory Smad6/7 was induced by kisspeptin. In addition, estrogen induced GPR54 expression, while kisspeptin increased the expression levels of ERα and ERβ, suggesting that the actions of estrogen and kisspeptin are mutually enhanced in GT1-7 cells. Moreover, kisspeptin stimulated MAPKs and AKT signaling, and ERK signaling was functionally involved in the kisspeptin-induced GnRH expression. BMP-4 was found to suppress kisspeptin-induced GnRH expression by reducing ERK signaling activity. Collectively, the results indicate that the axis of kisspeptin-induced GnRH production is bi-directionally controlled, being augmented by an interaction between ERα/β and GPR54 signaling and suppressed by BMP-4 action in GT1-7 neuron cells.

  8. Nuclear Technology. Course 29: Civil/Structural Inspection. Module 29-2, Structural Steel Materials, Installation and Inspection.

    ERIC Educational Resources Information Center

    Groseclose, Richard

    This second in a series of six modules for a course titled Civil/Structural Inspection describes the materials used in structural steel work; the standards according to which materials are purchased and inspected; fabrication, handling, and installation practices; and the various inspection tasks performed during erection operations. The module…

  9. Operation GREENHOUSE. Scientific Director's report. Annex 1. 1. Prompt-gamma-ray measurements. Part 4. Installation drawings. Nuclear explosions 1951

    SciTech Connect

    Hall, W.C.

    1984-10-31

    This report consists of drawings and tabular data pertinent to the various measurements performed in Operation GREENHOUSE. The drawings represent the plans for the cable installations, recorder stations, power and signal lines, and other equipment used in the measurement of prompt gamma rays, alpha, transit time, neutron intensity (Tenex), and thermal radiation.

  10. Nuclear Technology. Course 29: Civil/Structural Inspection. Module 29-2, Structural Steel Materials, Installation and Inspection.

    ERIC Educational Resources Information Center

    Groseclose, Richard

    This second in a series of six modules for a course titled Civil/Structural Inspection describes the materials used in structural steel work; the standards according to which materials are purchased and inspected; fabrication, handling, and installation practices; and the various inspection tasks performed during erection operations. The module…

  11. A feasibility assessment of installation, operation and disposal options for nuclear reactor power system concepts for a NASA growth space station

    NASA Technical Reports Server (NTRS)

    Bloomfield, Harvey S.; Heller, Jack A.

    1987-01-01

    A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth space station architecture was conducted to address a variety of installation, operational disposition, and safety issues. A previous NASA sponsored study, which showed the advantages of space station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide the feasibility of each combination.

  12. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    SciTech Connect

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.

  13. The influence of EI-21 redox ion-exchange resins on the secondary-coolant circuit water chemistry of vehicular nuclear power installations

    NASA Astrophysics Data System (ADS)

    Moskvin, L. N.; Rakov, V. T.

    2015-06-01

    The results obtained from testing the secondary-coolant circuit water chemistry of full-scale land-based prototype bench models of vehicular nuclear power installations equipped with water-cooled water-moderated and liquid-metal reactor plants are presented. The influence of copper-containing redox ionexchange resins intended for chemically deoxygenating steam condensate on the working fluid circulation loop's water chemistry is determined. The influence of redox ion-exchange resins on the water chemistry is evaluated by generalizing an array of data obtained in the course of extended monitoring using the methods relating to physicochemical analysis of the quality of condensate-feedwater path media and the methods relating to metallographic analysis of the state of a faulty steam generator's tube system surfaces. The deoxygenating effectiveness of the normal state turbine condensate vacuum deaeration system is experimentally determined. The refusal from applying redox ion-exchange resins in the condensate polishing ion-exchange filters is formulated based on the obtained data on the adverse effect of copper-containing redox ionexchange resins on the condensate-feedwater path water chemistry and based on the data testifying a sufficient effect from using the normal state turbine condensate vacuum deaeration system. Data on long-term operation of the prototype bench model of a vehicular nuclear power installation without subjecting the turbine condensate to chemical deoxygenation are presented.

  14. Neurokinin B Causes Acute GnRH Secretion and Repression of GnRH Transcription in GT1–7 GnRH Neurons

    PubMed Central

    Glidewell-Kenney, Christine A.; Shao, Paul P.; Iyer, Anita K.; Grove, Anna M. H.; Meadows, Jason D.

    2013-01-01

    Genetic studies in human patients with idiopathic hypogonadotropic hypogonadism (IHH) identified mutations in the genes that encode neurokinin B (NKB) and the neurokinin 3 receptor (NK3R). However, determining the mechanism whereby NKB regulates gonadotropin secretion has been difficult because of conflicting results from in vivo studies investigating the luteinizing hormone (LH) response to senktide, a NK3R agonist. NK3R is expressed in a subset of GnRH neurons and in kisspeptin neurons that are known to regulate GnRH secretion. Thus, one potential source of inconsistency is that NKB could produce opposing direct and indirect effects on GnRH secretion. Here, we employ the GT1-7 cell model to elucidate the direct effects of NKB on GnRH neuron function. We find that GT1-7 cells express NK3R and respond to acute senktide treatment with c-Fos induction and increased GnRH secretion. In contrast, long-term senktide treatment decreased GnRH secretion. Next, we focus on the examination of the mechanism underlying the long-term decrease in secretion and determine that senktide treatment represses transcription of GnRH. We further show that this repression of GnRH transcription may involve enhanced c-Fos protein binding at novel activator protein-1 (AP-1) half-sites identified in enhancer 1 and the promoter, as well as chromatin remodeling at the promoter of the GnRH gene. These data indicate that NKB could directly regulate secretion from NK3R-expressing GnRH neurons. Furthermore, whether the response is inhibitory or stimulatory toward GnRH secretion could depend on the history or length of exposure to NKB because of a repressive effect on GnRH transcription. PMID:23393128

  15. Effect of glutamate and extracellular calcium on uptake of inorganic lead (Pb2+) in immortalized mouse hypothalamic GT1-7 neuronal cells.

    PubMed

    Loikkanen, J; Naarala, J; Vähäkangas, K H; Savolainen, K M

    2006-01-25

    We have previously shown that although glutamate alone has no effects on viability of mouse hypothalamic GT1-7 cells, it clearly enhances Pb2+-induced cytotoxicity. It is likely that Pb2+ must enter cells to exert most of its toxic effects. Pb2+ is known to substitute for Ca2+ in many cellular processes. Therefore, we studied the uptake mechanisms of Pb2+ into GT1-7 neuronal cells with a special focus on the role of extracellular calcium (Ca2+), voltage-sensitive calcium channels (VSCCs) and glutamate. Basal uptake of Pb2+ (1 microM or 10 microM), i.e. without any external stimulus, clearly increased in nominally Ca2+-free buffer and was partially abolished by 13 mM Ca2+ when compared to uptake in the presence of a physiological concentration of extracellular Ca2+ (1.3 mM). Depolarization by 25 mM K+, or antagonists of VSCCs, verapamil (10 microM) or flunarizine (10 microM) had no clear effect on basal Pb2+ uptake. Glutamate (1 mM) increased Pb2+ uptake, but only when cells were treated with 1 microM Pb2+ in the presence of 1.3 mM Ca2+. Our data suggest that Pb2+ competes for the same cellular uptake pathways with Ca2+, although not via VSCCs. In addition, enhancement of Pb2+-induced neurotoxicity by glutamate may be due to increased neuronal uptake of Pb2+.

  16. Installation and evaluation of a nuclear power plant Operator Advisor based on artificial intelligence technology. Final report

    SciTech Connect

    Hajek, B.K.; Miller, D.W.

    1993-02-01

    The Artificial Intelligence Group in the Nuclear Engineering Program has designed and built an Operator Advisor (OA), an AI system to monitor nuclear power plant parameters, detect component and system malfunctions, dispose their causes, and provide the plant operators with the correct procedures for mitigating the consequences of the malfunctions. It then monitors performance of the procedures, and provides backup steps when specific operator actions fail. The OA has been implemented on Sun 4 workstations in Common Lisp, and has been interfaced to run in real time on the Perry Nuclear Power Plant full-function simulator in the plant training department. The eventual goal for a fully functioning Operator Advisor would be to have reactor operators receive direction for all plant operations. Such a goal requires considerable testing of the system within limited malfunction boundaries, an extensive Verification & Validation (V&V) effort, a large knowledge base development effort, and development of tools as part of the system to automate its maintenance. Clearly, these efforts are beyond the scope of the feasibility effort expended during this project period. However, as a result of this project, we have an AI based platform upon which a complete system can be built.

  17. An investigation into the accuracy of the albedo dosimeter DVGN-01 in measuring personnel irradiation doses in the fields of neutron radiation at nuclear power installations of the joint institute for nuclear research

    NASA Astrophysics Data System (ADS)

    Beskrovnaya, L. G.; Goroshkova, E. A.; Mokrov, Yu. V.

    2010-05-01

    The calculated results of research into the accuracy of an individual albedo dosimeter DVGN-01 as it corresponds to the personal equivalent dose for neutrons H p (10) and to the effective dose for neutrons E eff in the neutron fields at Joint Institute for Nuclear Research Nuclear Power Installations (JNPI) upon different geometries of irradiations are presented. It has been shown that correction coefficients are required for the specific estimation of doses by the dosimeter. These coefficients were calculated using the energy sensitivity curve of the dosimeter and the known neutron spectra at JNPI. By using the correction factors, the uncertainties of both doses will not exceed the limits given to the personnel according to the standards.

  18. Studies of the generation mechanisms of steady vortex formations in the channels of nuclear-power installations for purposes of improving the reliability and safety of their work

    NASA Astrophysics Data System (ADS)

    Mitrofanova, O.

    2017-01-01

    The analysis of the results of experimental researches on revealing the mechanisms of vortex formation in channels of complex geometry in the neutral and conductive media is carried out. The directions of researches related to the study of mechanisms of vortex generation and accumulation of energy by large-scale vortex structures are considered for the possibility of predictions of the man-made accidents and catastrophic natural phenomena. The main goal of ongoing investigations is the solution of the task aimed at improving the safety of nuclear power installations and, in particular, of the fast neutron reactors with liquid-metal coolants, and the prevention of emergency modes arising from acoustic, magnetic and hydrodynamic resonance effects.

  19. Calculation of the dose load during dismantling of large components in the process of decommissioning of nuclear installations

    SciTech Connect

    Hornacek, Martin; Necas, Vladimir; Bezak, Peter

    2013-07-01

    The paper is focused on the decommissioning process from the point of view of steam generator dismantling. A brief description of the steam generator (used in nuclear power plants with VVER 440 type reactor) and used computer code VISIPLAN 3D ALARA are given. The main part deals with the created model and dismantling strategy together with variable input parameters - decay time and decontamination. The obtained results - external exposure of workers and the influence of time and pre-dismantling decontamination - are studied. Also detailed analyses of every dismantling step considered are presented. (authors)

  20. Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants

    SciTech Connect

    Mays, Gary T; Belles, Randy; Cetiner, Sacit M; Howard, Rob L; Liu, Cheng; Mueller, Don; Omitaomu, Olufemi A; Peterson, Steven K; Scaglione, John M

    2012-06-01

    The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

  1. Water hammer phenomena occurring in nuclear power installations while filling horizontal pipe containing saturated steam with liquid

    SciTech Connect

    Selivanov, Y.F.; Kirillov, P.L.; Yefanov, A.D.

    1995-09-01

    The potentiality of the water hammer occurrence in nuclear reactor loop components has been considered under the conditions of filling a steam-containing pipeline leg involving horizontal and vertical sections with liquid subcooled to the saturation temperature. As a result of free discharging from the tank, the liquid enters the horizontal pipeline. When the liquid slug formation in the pipeline is fulfilled. The pressure drop being occurred in steam flowing along the pipelines causes the liquid slug to move to the pipeline inlet. When the liquid slug decelerates, a water hammer occurs. This mechanism of water hammer occurrence is tested by experiments. The regimes of the occurrence of multiple considerable water hammers were identified.

  2. Study on systematizing the synthesis of the a-series ganglioside glycans GT1a, GD1a, and GM1 using the newly developed N-Troc-protected GM3 and GalN intermediates.

    PubMed

    Komori, Tatsuya; Imamura, Akihiro; Ando, Hiromune; Ishida, Hideharu; Kiso, Makoto

    2009-08-17

    A first systematic synthesis of the glycan parts of the a-series gangliosides (GT1a, GD1a, and GM1) utilizing the newly developed N-Troc-protected GM3 and galactosaminyl building blocks is described. The key processes, including the assembly of the GM2 sequence and its conversion into the 3-hydroxy acceptor, were facilitated mainly by the high degree of participation and chemoselective cleavability of the Troc group in the galactosaminyl unit. Furthermore, the novel GM2 acceptor served as a good coupling partner during glycosylation with galactosyl, sialyl galactosyl, and disialyl galactosyl donors, successfully producing the GM1, GD1a, and GT1a glycans.

  3. Serotonin stimulates GnRH secretion through the c-Src-PLC gamma1 pathway in GT1-7 hypothalamic cells.

    PubMed

    Kim, Hyeon Soo; Yumkham, Sanatombi; Choi, Jang Hyun; Son, Gi Hoon; Kim, Kyungjin; Ryu, Sung Ho; Suh, Pann-Ghill

    2006-09-01

    Serotonin is a neurotransmitter that alters the hypothalamic-pituitary-adrenal axis. To date, however, the molecular mechanisms underlying the role of serotonin in hormone secretion have remained largely unclear. In this study, we report that serotonin activates phospholipase C (PLC) gamma1 in an Src-dependent manner in hypothalamic GT1-7 cells, and that pretreatment with either 4-amino-5-(4-chlorophenyl)-7-(t-butyl) pyrazole [3, 4-d] pyrimidine, an Src-kinase inhibitor, or U73122, a PLC inhibitor, attenuates the serotonin-induced increase in calcium levels. Also, PLC gamma1 binds to c-Src through the Src-homology (SH) 223 domain upon serotonin treatment. Moreover, calcium increase is alleviated in the cells transientlyexpressing SH223 domain-deleted PLC gamma1 or lipase inactive mutant PLC gamma1, as compared with cells transfected with wild-type PLC gamma1. Furthermore, the inhibition of the activities of either PLC or Src results in a significant diminution of the serotonin-induced release of gonadotropin-releasing hormone (GnRH). In addition, the results of our small-interfering RNA experiment confirm that endogenous PLC gamma1 is a prerequisite for serotonin-mediated signaling pathways. Taken together, our findings demonstrate that serotonin stimulates the release of GnRH through the Src-PLC gamma1 pathway, via the modulation of intracellular calcium levels.

  4. An In Vitro System Comprising Immortalized Hypothalamic Neuronal Cells (GT1–7 Cells) for Evaluation of the Neuroendocrine Effects of Essential Oils

    PubMed Central

    Mizuno, Dai; Konoha-Mizuno, Keiko; Mori, Miwako; Yamazaki, Kentaro; Haneda, Toshihiro; Koyama, Hironari; Kawahara, Masahiro

    2015-01-01

    Aromatherapy and plant-based essential oils are widely used as complementary and alternative therapies for symptoms including anxiety. Furthermore, it was reportedly effective for the care of several diseases such as Alzheimer's disease and depressive illness. To investigate the pharmacological effects of essential oils, we developed an in vitro assay system using immortalized hypothalamic neuronal cells (GT1–7 cells). In this study, we evaluated the effects of essential oils on neuronal death induced by hydrogen peroxide (H2O2), aluminum, zinc, or the antagonist of estrogen receptor (tamoxifen). Among tests of various essential oils, we found that H2O2-induced neuronal death was attenuated by the essential oils of damask rose, eucalyptus, fennel, geranium, ginger, kabosu, mandarin, myrrh, and neroli. Damask rose oil had protective effects against aluminum-induced neurotoxicity, while geranium and rosemary oil showed protective activity against zinc-induced neurotoxicity. In contrast, geranium oil and ginger oil enhanced the neurotoxicity of tamoxifen. Our in vitro assay system could be useful for the neuropharmacological and endocrine pharmacological studies of essential oils. PMID:26576190

  5. Pb2+-induced toxicity is associated with p53-independent apoptosis and enhanced by glutamate in GT1-7 neurons.

    PubMed

    Loikkanen, Jarkko; Chvalova, Katerina; Naarala, Jonne; Vähäkangas, Kirsi H; Savolainen, Kai M

    2003-09-30

    Recent studies indicate that the glutamatergic neurotransmitter system is involved in neurotoxicity caused by inorganic lead (Pb2+). We studied the role of apoptosis in the effects induced by Pb2+ (0.01-100 microM) and glutamate (0.1 and 1 mM) in mouse hypothalamic GT1-7 neurons. Although glutamate alone had no effect on cell viability, it enhanced neuronal cell death induced by Pb2+ (1-100 microM) within 72 h. Glutamate alone neither induced caspase-3-like protease activity nor promoted internucleosomal DNA fragmentation, both biochemical hallmarks of apoptosis. However, concurrent exposure to Pb2+ (10 or 100 microM) and glutamate (1 mM) resulted in more prominent cleavage of the fluorogenic caspase-3 substrate (Ac-DEVD-AMC) than caused by the same Pb2+ concentrations alone at 24-72 h. The highest caspase-3-like protease activities were measured at 48 h. Internucleosomal DNA fragmentation caused by Pb2+ (10 or 100 microM) alone or together with glutamate (1 mM) was evident at 96 h, less clear at 72 h and absent at 48 h. Immunoblotting did not reveal any changes in p53 protein levels in cells exposed to Pb2+, glutamate or their combination at any studied time point (3-72 h). Our results suggest that Pb2+-induced neurotoxicity may partially be mediated through p53-independent apoptosis and enhanced by glutamate.

  6. GnRH agonist reduces estrogen receptor dimerization in GT1-7 cells: evidence for cross-talk between membrane-initiated estrogen and GnRH signaling.

    PubMed

    Chason, Rebecca J; Kang, Jung-Hoon; Gerkowicz, Sabrina A; Dufau, Maria L; Catt, Kevin J; Segars, James H

    2015-03-15

    17β-estradiol (E2), a key participant on the initiation of the LH surge, exerts both positive and negative feedback on GnRH neurons. We sought to investigate potential interactions between estrogen receptors alpha (ERα) and beta (ERβ) and gonadotropin releasing hormone receptor (GnRH-R) in GT1-7 cells. Radioligand binding studies demonstrated a significant decrease in saturation E2 binding in cells treated with GnRH agonist. Conversely, there was a significant reduction in GnRH binding in GT1-7 cells treated with E2. In BRET(1) experiments, ERα-ERα dimerization was suppressed in GT1-7 cells treated with GnRH agonist (p < 0.05). There was no evidence of direct interaction between ERs and GnRH-R. This study provides the first evidence of reduced ERα homodimerization by GnRH agonist. Collectively, these findings demonstrate significant cross-talk between membrane-initiated GnRH and E2 signaling in GT1-7 cells.

  7. Wheel Installation

    NASA Image and Video Library

    2010-07-07

    In this picture, the Curiosity rover sports a set of six new wheels. The wheels were installed on June 28 and 29 in the Spacecraft Assembly Facility at NASA Jet Propulsion Laboratory, Pasadena, Calif.

  8. Lighting installations

    NASA Technical Reports Server (NTRS)

    Schurer, Kees

    1994-01-01

    Model computations that give the lay-out of a lighting installation have to be implemented in the real world. There, deviations from the ideal performance of just about every element of the installation will be felt. A list of possible sources of non-ideal behavior, based on practical experience, are: lamps, ballasts, reflectors, mounting position, sagging of lamps, and soiling. It is clear that with all possible deviations from the ideal the homogeneity of a real lighting installation can never be as good as the one computed. The only way to make sure it is nearly as good is by measurement of the actual light distribution. Then, an occasional adjustment or replacement may often yield a satisfactory result. This measurement should really be part of the installation contract.

  9. Procedure of calculation of the spatial distribution of temperatures and heat fluxes in the steam generator of a nuclear power installation with an RBEC fast-neutron reactor

    NASA Astrophysics Data System (ADS)

    Frolov, A. A.; Sedov, A. A.

    2016-08-01

    A method for combined 3D/1D-modeling of thermohydraulics of a once-through steam generator (SG) based on the joint analysis of three-dimensional thermo- and hydrodynamics of a single-phase heating coolant in the intertube space and one-dimensional thermohydraulics of steam-generating channels (tubes) with the use of well-known friction and heat-transfer correlations under various boiling conditions is discussed. This method allows one to determine the spatial distribution of temperatures and heat fluxes of heat-exchange surfaces of SGs with a single-phase heating coolant in the intertube space and with steam generation within tubes. The method was applied in the analytical investigation of typical operation of a once-through SG of a nuclear power installation with an RBEC fast-neutron heavy-metal reactor that is being designed by Kurchatov Institute in collaboration with OKB GIDROPRESS and Leipunsky Institute of Physics and Power Engineering. Flow pattern and temperature fields were obtained for the heavy-metal heating coolant in the intertube space. Nonuniformities of heating of the steam-water coolant in different heat-exchange tubes and nonuniformities in the distribution of heat fluxes at SG heat-exchange surfaces were revealed.

  10. Emergency Preparedness technology support to the Health and Safety Executive (HSE), Nuclear Installations Inspectorate (NII) of the United Kingdom. Appendix A

    SciTech Connect

    O`Kula, K.R.

    1994-03-01

    The Nuclear Installations Inspectorate (NII) of the United Kingdom (UK) suggested the use of an accident progression logic model method developed by Westinghouse Savannah River Company (WSRC) and Science Applications International Corporation (SAIC) for K Reactor to predict the magnitude and timing of radioactivity releases (the source term) based on an advanced logic model methodology. Predicted releases are output from the personal computer-based model in a level-of-confidence format. Additional technical discussions eventually led to a request from the NII to develop a proposal for assembling a similar technology to predict source terms for the UK`s advanced gas-cooled reactor (AGR) type. To respond to this request, WSRC is submitting a proposal to provide contractual assistance as specified in the Scope of Work. The work will produce, document, and transfer technology associated with a Decision-Oriented Source Term Estimator for Emergency Preparedness (DOSE-EP) for the NII to apply to AGRs in the United Kingdom. This document, Appendix A is a part of this proposal.

  11. Independent technical support for the frozen soil barrier installation and operation at the Fukushima Daiichi Nuclear Power Station (F1 Site)

    SciTech Connect

    Looney, Brian B.; Jackson, Dennis G.; Truex, Michael J.; Johnson, Christian D.

    2015-02-23

    TEPCO is implementing a number of water countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of protection. In general, the strategy represents a comprehensive example of a “defense in depth” concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area and provide TEPCO the ability to reduce the amount of contaminated water that requires treatment and storage. The National Laboratory team supports the selection of artificial ground freezing and the incorporation of the frozen soil barrier in the contaminated water countermeasures -- the technical characteristics of a frozen barrier are relatively well suited to the Fukushima-specific conditions and the need for inflow reduction. Further, our independent review generally supports the TEPCO/Kajima design, installation strategy and operation plan.

  12. Cell death mechanisms in GT1-7 GnRH cells exposed to polychlorinated biphenyls PCB74, PCB118, and PCB153

    SciTech Connect

    Dickerson, Sarah M.; Guevara, Esperanza; Woller, Michael J.; Gore, Andrea C.

    2009-06-01

    Exposure to endocrine disrupting chemicals (EDCs) such as polychlorinated biphenyls (PCBs) causes functional deficits in neuroendocrine systems. We used an immortalized hypothalamic GT1-7 cell line, which synthesizes the neuroendocrine peptide gonadotropin-releasing hormone (GnRH), to examine the neurotoxic and endocrine disrupting effects of PCBs and their mechanisms of action. Cells were treated for 1, 4, 8, or 24 h with a range of doses of a representative PCB from each of three classes: coplanar (2,4,4',5-tetrachlorobiphenyl: PCB74), dioxin-like coplanar (2',3,4,4',5' pentachlorobiphenyl: PCB118), non-coplanar (2,2',4,4',5,5'-hexachlorobiphenyl: PCB153), or their combination. GnRH peptide concentrations, cell viability, apoptotic and necrotic cell death, and caspase activation were quantified. In general, GnRH peptide levels were suppressed by high doses and longer durations of PCBs, and elevated at low doses and shorter timepoints. The suppression of GnRH peptide levels was partially reversed in cultures co-treated with the estrogen receptor antagonist ICI 182,780. All PCBs reduced viability and increased both apoptotic and necrotic cell death. Although the effects for the three classes of PCBs were often similar, subtle differences in responses, together with evidence that the combination of PCBs acted slightly different from individual PCBs, suggest that the three tested PCB compounds may act via slightly different or more than one mechanism. These results provide evidence that PCB congeners have endocrine disrupting and/or neurotoxic effects on the hypothalamic GnRH cell line, a finding that has implications for environmental endocrine disruption in animals.

  13. Cell death mechanisms in GT1-7 GnRH cells exposed to polychlorinated biphenyls PCB74, PCB118, and PCB153

    PubMed Central

    Dickerson, Sarah M.; Guevara, Esperanza; Woller, Michael J.; Gore, Andrea C.

    2009-01-01

    Exposure to endocrine-disrupting chemicals (EDCs) such as polychlorinated biphenyls (PCBs) causes functional deficits in neuroendocrine systems. We used an immortalized hypothalamic GT1-7 cell line, which synthesizes the neuroendocrine peptide gonadotropin-releasing hormone (GnRH), to examine the neurotoxic and endocrine disrupting effects of PCBs and their mechanisms of action. Cells were treated for 1, 4, 8, or 24 h with a range of doses of a representative PCB from each of three classes: coplanar (2,4,4′,5-tetrachlorobiphenyl: PCB74), dioxin-like coplanar (2′,3,4,4′,5′ pentachlorobiphenyl: PCB118), non-coplanar (2,2′,4,4′,5,5′-hexachlorobiphenyl: PCB153), or their combination. GnRH peptide concentrations, cell viability, apoptotic and necrotic cell death, and caspase activation were quantified. In general, GnRH peptide levels were suppressed by high doses and longer durations of PCBs, and elevated at low doses and shorter time points. The suppression of GnRH peptide levels was partially reversed in cultures co-treated with the estrogen receptor antagonist ICI 182,780. All PCBs reduced viability and increased both apoptotic and necrotic cell death. Although the effects for the three classes of PCBs were often similar, subtle differences in responses, together with evidence that the combination of PCBs acted slightly differently from individual PCBs, suggest that the three tested PCB compounds may act via slightly different or more than one mechanism. These results provide evidence that PCB congeners have endocrine disrupting and/or neurotoxic effects on the hypothalamic GnRH cell line, a finding that has implications for environmental endocrine disruption in animals. PMID:19362103

  14. Amylin and leptin activate overlapping signalling pathways in an additive manner in mouse GT1-7 hypothalamic, C₂C₁₂ muscle and AML12 liver cell lines.

    PubMed

    Moon, H-S; Chamberland, J P; Mantzoros, C S

    2012-01-01

    It has been suggested that amylin amplifies leptin's effects and affects energy homeostasis synergistically with leptin in animals and humans. However, no previous study has reported on amylin and leptin signalling in hypothalamic, muscle and liver cells. Leptin and amylin signalling studies were performed in vitro in mouse GT1-7 hypothalamic, C₂C₁₂ muscle and AML12 liver cell lines. Treatment of mouse GT1-7 and C₂C₁₂ cells with leptin or amylin increased signal transducer and activator of transcription 3 (STAT3) phosphorylation in a dose- and time-dependent manner. In mouse AML12 cells, leptin and amylin produced a biphasic response of STAT3 activity. Importantly, all leptin and amylin signalling pathways were saturable at leptin and amylin concentrations of ∼100 and ∼50 to 100 ng/ml, respectively. Leptin and amylin in combination activated STAT3, AMP-activated protein kinase (AMPK), extracellular signal-regulated kinase (ERK) 1/2 and Akt signalling pathways in an additive manner, effects that were abolished under endoplasmic reticulum (ER) stress. Leptin, but not amylin, increased IRS-1 phosphorylation in GT1-7 hypothalamic, but not in C₂C₁₂ muscle and AML12 liver cell lines. Our data suggest that leptin and amylin have overlapping and additive, but not synergistic, effects in the activation of intracellular signalling pathways. ER stress may induce leptin and amylin resistance in hypothalamic, muscle and liver cell lines. These novel insights into the mode of action of leptin and amylin suggest that these hormones may play an additive role in regulating energy homeostasis in humans.

  15. 17beta-estradiol at physiological concentrations augments Ca(2+) -activated K+ currents via estrogen receptor beta in the gonadotropin-releasing hormone neuronal cell line GT1-7.

    PubMed

    Nishimura, Ichiro; Ui-Tei, Kumiko; Saigo, Kaoru; Ishii, Hirotaka; Sakuma, Yasuo; Kato, Masakatsu

    2008-02-01

    Estrogens play essential roles in the neuroendocrine control of reproduction. In the present study, we focused on the effects of 17beta-estradiol (E2) on the K(+) currents that regulate neuronal cell excitability and carried out perforated patch-clamp experiments with the GnRH-secreting neuronal cell line GT1-7. We revealed that a 3-d incubation with E2 at physiological concentrations (100 pm to 1 nm) augmented Ca(2+)-activated K(+) [K(Ca)] currents without influencing Ca(2+)-insensitive voltage-gated K(+) currents in GT1-7 cells. Acute application of E2 (1 nm) had no effect on the either type of K(+) current. The augmentation was completely blocked by an estrogen receptor (ER) antagonist, ICI-182,780. An ERbeta-selective agonist, 2,3-bis(4-hydroxyphenyl)-propionitrile, augmented the K(Ca) currents, although an ERalpha-selective agonist, 4,4',4''-[4-propyl-(1H)-pyrazole-1,3,5-triyl]tris-phenol, had no effect. Knockdown of ERbeta by means of RNA interference blocked the effect of E2 on the K(Ca) currents. Furthermore, semiquantitative RT-PCR analysis revealed that the levels of BK channel subunit mRNAs for alpha and beta4 were significantly increased by incubating cells with 300 pm E2 for 3 d. In conclusion, E2 at physiological concentrations augments K(Ca) currents through ERbeta in the GT1-7 GnRH neuronal cell line and increases the expression of the BK channel subunit mRNAs, alpha and beta4.

  16. Brain gangliosides of a transgenic mouse model of Alzheimer's disease with deficiency in GD3-synthase: expression of elevated levels of a cholinergic-specific ganglioside, GT1

    PubMed Central

    Ariga, Toshio; Itokazu, Yutaka; McDonald, Michael P.; Hirabayashi, Yoshio; Ando, Susumu; Yu, Robert K.

    2013-01-01

    In order to examine the potential involvement of gangliosides in AD (Alzheimer's disease), we compared the ganglioside compositions of the brains of a double-transgenic (Tg) mouse model [APP (amyloid precursor protein)/PSEN1 (presenilin)] of AD and a triple mutant mouse model with an additional deletion of the GD3S (GD3-synthase) gene (APP/PSEN1/GD3S−/−). These animals were chosen since it was previously reported that APP/PSEN1/GD3S−/− triple-mutant mice performed as well as WT (wild-type) control and GD3S−/− mice on a number of reference memory tasks. Cholinergic neuron-specific gangliosides, such as GT1aα and GQ1bα, were elevated in the brains of double-Tg mice (APP/PSEN1), as compared with those of WT mice. Remarkably, in the triple mutant mouse brains (APP/PSEN1/GD3S−/−), the concentration of GT1aα was elevated and as expected there was no expression of GQ1bα. On the other hand, the level of c-series gangliosides, including GT3, was significantly reduced in the double-Tg mouse brain as compared with the WT. Thus, the disruption of the gene of a specific ganglioside-synthase, GD3S, altered the expression of cholinergic neuron-specific gangliosides. Our data thus suggest the intriguing possibility that the elevated cholinergic-specific ganglioside, GT1aα, in the triple mutant mouse brains (APP/PSEN1/GD3S−/−) may contribute to the memory retention in these mice. PMID:23565921

  17. Brain gangliosides of a transgenic mouse model of Alzheimer's disease with deficiency in GD3-synthase: expression of elevated levels of a cholinergic-specific ganglioside, GT1aα.

    PubMed

    Ariga, Toshio; Itokazu, Yutaka; McDonald, Michael P; Hirabayashi, Yoshio; Ando, Susumu; Yu, Robert K

    2013-05-30

    In order to examine the potential involvement of gangliosides in AD (Alzheimer's disease), we compared the ganglioside compositions of the brains of a double-transgenic (Tg) mouse model [APP (amyloid precursor protein)/PSEN1 (presenilin)] of AD and a triple mutant mouse model with an additional deletion of the GD3S (GD3-synthase) gene (APP/PSEN1/GD3S(-/-)). These animals were chosen since it was previously reported that APP/PSEN1/GD3S(-/-) triple-mutant mice performed as well as WT (wild-type) control and GD3S(-/-) mice on a number of reference memory tasks. Cholinergic neuron-specific gangliosides, such as GT1aα and GQ1bα, were elevated in the brains of double-Tg mice (APP/PSEN1), as compared with those of WT mice. Remarkably, in the triple mutant mouse brains (APP/PSEN1/GD3S(-/-)), the concentration of GT1aα was elevated and as expected there was no expression of GQ1bα. On the other hand, the level of c-series gangliosides, including GT3, was significantly reduced in the double-Tg mouse brain as compared with the WT. Thus, the disruption of the gene of a specific ganglioside-synthase, GD3S, altered the expression of cholinergic neuron-specific gangliosides. Our data thus suggest the intriguing possibility that the elevated cholinergic-specific ganglioside, GT1aα, in the triple mutant mouse brains (APP/PSEN1/GD3S(-/-)) may contribute to the memory retention in these mice.

  18. Expression of gonadotropin-inhibitory hormone receptors in mouse pituitary gonadotroph LβT2 cells and hypothalamic gonadotropin-releasing hormone-producing GT1-7 cells.

    PubMed

    Sukhbaatar, Unurjargal; Kanasaki, Haruhiko; Mijiddorj, Tselmeg; Oride, Aki; Miyazaki, Kohji

    2014-01-01

    Gonadotropin-inhibitory hormone (GnIH) was first identified in quail as a novel neurohormone that acts directly on the anterior pituitary to inhibit gonadotropin release. GnIH inhibits not only gonadotropin release from the pituitary gland but also inhibits the release of gonadotropin-releasing hormone (GnRH) from the hypothalamus. In this study, we examined how GnIH receptors were regulated in pituitary gonadotroph cells and GnRH-producing neurons in the hypothalamus. In the mouse pituitary gonadotroph cell line LβT2, GnRH increased expression of the GnIH receptor, G-protein coupled receptor 74 (GPR74). GnRH also stimulated the expression of GPR74 and GPR147 in primary cultures of rat anterior pituitary cells. In addition, when GnRH was administered to LβT2 cells in a pulsatile manner, low frequency GnRH pulse stimulation stimulated GPR74 and GPR147 expression more than did high frequency GnRH pulses. In the mouse hypothalamic GnRH-producing cell line GT1-7, hypothalamic kisspeptin did not significantly increase the expression of GnIH receptors. However, the intermittent administration of kisspeptin to GT1-7 cells significantly increased GPR74 and GPR147 mRNA expression. The overexpression of either constitutively active MEK kinase (MEKK) or protein kinase A (PKA) in LβT2 cells increased the expression of GPR74 mRNA. Conversely, in GT1-7 cells, although the overexpression of either MEKK or PKA failed to stimulate GnIH receptor expression, the combined overexpression of both kinases together increased GPR74 and GPR147 mRNA levels. Our current observations suggest that two central controllers of reproductive function, GnRH and kisspeptin, stimulate the expression of GnIH receptors in pituitary gonadotroph cells and hypothalamic GnRH neurons.

  19. NaCl stress induces CsSAMs gene expression in Cucumis sativus by mediating the binding of CsGT-3b to the GT-1 element within the CsSAMs promoter.

    PubMed

    Wang, Li-Wei; He, Mei-Wen; Guo, Shi-Rong; Zhong, Min; Shu, Sheng; Sun, Jin

    2017-05-01

    The CsSAMs promoter is a salt-stress-inducible promoter containing three GT-1 elements that are sufficient for the salt-stress response. The transcription factor CsGT-3b was found to bind to the GT-1 element. The S-adenosyl-L-methionine synthase (SAMs) gene is among the functional genes induced during environmental stress. However, little is known about the regulatory mechanism and upstream regulators of this salt-inducible gene in cucumber plants. Thus, it is necessary to understand the characteristics of the SAMs gene by analyzing its promoter and transcription factors. In this study, we isolated and functionally analyzed a 1743-bp flanking fragment of the CsSAMs gene from Cucumis sativus. To examine promoter activity, the full-length promoter, as well as different promoter fragments, were fused to the β-glucuronidase (GUS) reporter gene and introduced into the tobacco genome. The full-length promoter displayed maximal promoter activity, whereas the P4 promoter, containing 321 bp of upstream sequence, showed no basal promoter activity. In addition, the CsSAMs promoter exhibited stress-inducible regulation rather than tissue-specific activity in transgenic tobacco. Histochemical analysis revealed strong GUS staining in leaves, stems, and roots, especially in the veins of leaves, the vascular bundle of stems, and root tip zones following NaCl stress. A transient expression assay confirmed that the 242-bp region (-1743 to -1500) was sufficient for the NaCl-stress response. Yeast one-hybrid assays further revealed interaction between the NaCl-response protein CsGT-3b and the GT-1 (GAAAAA) element within the 242-bp region. Taken together, we revealed the presence of four salt-stress-responsive elements (GT-1 cis-elements) in the CsSAMs promoter and identified a transcription factor, CsGT-3b, that specifically binds to this sequence. These results might help us better understand the intricate regulatory network of the cucumber SAMs gene.

  20. An Open-Label Trial of 12-Week Simeprevir plus Peginterferon/Ribavirin (PR) in Treatment-Naïve Patients with Hepatitis C Virus (HCV) Genotype 1 (GT1)

    PubMed Central

    Asselah, Tarik; Moreno, Christophe; Sarrazin, Christoph; Gschwantler, Michael; Foster, Graham R.; Craxí, Antonio; Buggisch, Peter; Ryan, Robert; Lenz, Oliver; Scott, Jane; Van Dooren, Gino; Lonjon-Domanec, Isabelle; Schlag, Michael; Buti, Maria

    2016-01-01

    Background Shortening duration of peginterferon-based HCV treatment reduces associated burden for patients. Primary objectives of this study were to assess the efficacy against the minimally acceptable response rate 12 weeks post-treatment (SVR12) and safety of simeprevir plus PR in treatment-naïve HCV GT1 patients treated for 12 weeks. Additional objectives included the investigation of potential associations of rapid viral response and baseline factors with SVR12. Methods In this Phase III, open-label study in treatment-naïve HCV GT1 patients with F0–F2 fibrosis, patients with HCV-RNA <25 IU/mL (detectable/undetectable) at Week 2, and undetectable HCV-RNA at Weeks 4 and 8, stopped all treatment at Week 12. All other patients continued PR for a further 12 weeks. Baseline factors significantly associated with SVR12 were identified through logistic regression. Results Of 163 patients who participated in the study, 123 (75%) qualified for 12-week treatment; of these, 81 (66%) achieved SVR12. Baseline factors positively associated with SVR12 rates in patients receiving the 12-week regimen were: IL28B CC genotype: (94% SVR12); HCV RNA ≤800,000 IU/mL (82%); F0–F1 fibrosis (74%). Among all 163 patients, 94% experienced ≥1 adverse event (AE), 4% a serious AE, and 2.5% discontinued due to an AE. Reduced impairment in patient-reported outcomes was observed in the 12-week vs >12-week regimen. Conclusions Overall SVR12 rate (66%) was below the target of 80%, indicating that shortening of treatment with simeprevir plus PR to 12 weeks based on very early response is not effective. However, baseline factors associated with higher SVR12 rates were identified. Therefore, while Week 2 response alone is insufficient to predict efficacy, GT1 patients with favourable baseline factors may benefit from a shortened simeprevir plus PR regimen. Trial Registration ClinicalTrials.gov NCT01846832 PMID:27428331

  1. Primary system fission product release and transport: A state-of-the-art report to the committee on the safety of nuclear installations

    SciTech Connect

    Wright, A.L.

    1994-06-01

    This report presents a summary of the status of research activities associated with fission product behavior (release and transport) under severe accident conditions within the primary systems of water-moderated and water-cooled nuclear reactors. For each of the areas of fission product release and fission product transport, the report summarizes relevant information on important phenomena, major experiments performed, relevant computer models and codes, comparisons of computer code calculations with experimental results, and general conclusions on the overall state of the art. Finally, the report provides an assessment of the overall importance and knowledge of primary system release and transport phenomena and presents major conclusions on the state of the art.

  2. Efficient and compact mobile equipment based on the new RADEON-NWM technology to process liquid radioactive wastes resulted from the accidents of the nuclear installations

    SciTech Connect

    Martoyan, Gagik; Nalbandyan, Garik; Gagiyan, Lavrenti; Karamyan, Gagik; Brutyan, Gagik

    2013-07-01

    During the operation of nuclear reactors important volume of liquid and solid radioactive wastes are generated, which, in normal conditions, becomes processed by stationary equipment by different methods to minimize their volume and then sent to specially constructed storages. The cases of accidents of Chernobyl and Fukushima showed that the localization of rejected big quantity of radioactive wastes is a prior problem for their further processing by stationary equipment. In this regard it is very important the processing of radioactive wastes on the contaminated areas to localize them by mobile equipment based on the efficient technologies. RADEONNWM new technology allows resolving this problem. This technology is compact, completely automated, which makes possible to assemble it on a standard 40-ft by 7-ft trailer driven by heavy-duty truck. The new technology is fully elaborated, the necessary tests are conducted. (authors)

  3. Nuclear energy law after Chernobyl

    SciTech Connect

    Cameron, P.; Harcher, L.

    1988-01-01

    This work examines the legal issues surrounding the possibility of accidents at nuclear installations in Europe. Contents include: Regulations and control by international organizations in the context of a nuclear accident; The role of Euratom; Border installations: the interaction of administrative, European community and public international law; and Border installations: the experience of Wackersdorf. Concepts of nuclear liability and the liability of suppliers to nuclear power plants are discussed.

  4. Hopkins installs wire harnesses

    NASA Image and Video Library

    2013-11-24

    ISS038-E-008291 (24 Nov. 2013) --- NASA astronaut Michael Hopkins, Expedition 38 flight engineer, installs wire harnesses in the International Space Station?s Harmony node to support the installation of Ethernet video cables for the station?s local area network. These new cables will provide Ethernet connectivity to the visiting vehicles that dock to Harmony?s Earth-facing port.

  5. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. In view are five levels of platforms previously installed. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  6. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is prepared for installation Oct. 24, 2010, at John C. Stennis Space Center. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  7. AMS Time Lapse Installation

    NASA Image and Video Library

    A time lapse video compilation of the installation of the Alpha Magnetic Spectrometer on the International Space Station’s starboard truss using the station’s robotic arm, Canadarm2, during the...

  8. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  9. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014934 (16 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  10. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014979 (17 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  11. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014956 (16 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  12. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014973 (17 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  13. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014952 (16 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  14. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014930 (16 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  15. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014981 (17 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  16. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lowered by crane for installation on the north side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting, lowering and installation. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  17. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. In view below are eight levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Installing Juno Radiation Vault

    NASA Image and Video Library

    2010-07-12

    Technicians installed a special radiation vault onto the propulsion module of NASA Juno spacecraft. Each titanium wall measures nearly a square meter nearly 10 square feet in area and about 1 centimeter a third of an inch in thickness.

  20. LH tank installation

    NASA Image and Video Library

    2011-07-25

    Stennis Space Center employees marked another construction milestone July 25 with installation of the 85,000-gallon liquid hydrogen tank atop the A-3 Test Stand. The 300-foot-tall stand is being built to test next-generation rocket engines that could carry humans into deep space once more. The liquid hydrogen tank and a 35,000-gallon liquid oxygen tank installed atop the steel structure earlier in June will provide fuel propellants for testing the engines.

  1. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, construction workers assist with the installation of the final work platform, A north, in High Bay 3, as a crane lowers the platform into place. The platform will be installed and secured on its rail beam high up on the north wall of the high bay. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  2. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the final work platform, A north, for installation in High Bay 3. The platform will be installed and secured on its rail beam high up on the north wall of the high bay. In view on the platform are the American flag and a small tree. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  3. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    A heavy-lift crane lifts the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The B platform will be installed on the south side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. In view are five levels of platforms previously installed. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  5. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, has been lowered into place for installation on the north wall of High Bay 3. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  6. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines prepares to assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines monitors the progress during the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  8. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines turns a bolt to help secure the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, during installation in High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The B platform is being installed on the north side of the high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  9. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    A heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  10. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines assists with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lowers the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. In view below are the six levels of previously installed platforms. The D platform will be installed on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  13. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    A heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  14. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle. The platform will be moved into High Bay 3 for installation on the south side of the high bay. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  15. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  16. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    In this view looking up in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  17. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, is lowered into position for installation on the north side of High Bay 3. In view below are the seven levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. LOX tank installation

    NASA Image and Video Library

    2011-06-08

    Construction of the A-3 Test Stand at Stennis Space Center continued June 8 with installation of a 35,000-gallon liquid oxygen tank atop the steel structure. The stand is being built to test next-generation rocket engines that will carry humans into deep space once more. The LOX tank and a liquid hydrogen tank to be installed atop the stand later will provide propellants for testing the engines. The A-3 Test Stand is scheduled for completion and activation in 2013.

  20. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is hoisted into place at the E-2 Test Stand at John C. Stennis Space Center on Oct. 24, 2010. The unit was installed at the E-2 stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  1. CSG delivery and installation

    NASA Image and Video Library

    2010-10-22

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand arrived at John. C. Stennis Space Center on Oct. 22, 2010. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  2. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    John C. Stennis Space Center employees complete installation of a chemical steam generator (CSG) unit at the site's E-2 Test Stand. On Oct. 24, 2010. The unit will undergo verification and validation testing on the E-2 stand before it is moved to the A-3 Test Stand under construction at Stennis. Each CSG unit includes three modules. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  3. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    In High Bay 3 inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist during installation of the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  4. T2 Install Operations

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043639 (30 Sept. 2009) --- European Space Agency astronaut Frank De Winne, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  5. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    A close-up view of an American flag and a small tree on the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  6. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    The American flag and a small tree are in view on the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  7. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    The American flag can be seen hanging from the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  8. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    In a view from below, the American flag is in view hanging from the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  9. Digital Sculpture Installations

    ERIC Educational Resources Information Center

    Sherwood, Catherine

    2006-01-01

    This author relates how she came upon the idea of using an image-editing program to virtually install monumental sculptures into real-life landscapes in her desire to bring technology and sculpture together in her art class. In this article, she describes how she made her class create tabletop-sized sculptures and photographs of digital…

  10. Solenoidal Magnet Installation

    SciTech Connect

    Stredde, H.; Lee, A.; /Fermilab

    1998-01-21

    The major modification to the D0 detector for the next physics collider run is the upgrade of the central tracking system. The first component to be installed will be the solenoid magnet, with the central pre-shower attached. This engineering note is directed to the installation of the solenoid magnet and the equipment needed to accomplish this task. As part of the installation process, the main detector must undergo a change in position of one of its major components, namely the South End Calorimeter (SEC). This calorimeter must be completely decoupled from the main detector, i.e. all cabling and cryo lines removed. The equipment used for installing all calorimeters (bridge and support structures) will be put into position and the calorimeter (SEC) will be pulled off of the detector center beam and parked on the south sidewalk of the D0 Assembly Hall. The necessary cryo lines will re-connected in order to keep the cryostat cold. This calorimeter will remain here during the greater portion of the upgrade reconfiguration schedule. When this task is finished, the old central tracking system and its mounts will be removed from the bore of the Central Calorimeter (CC). The main detector is now ready to receive the new tracking system, starting with the solenoid magnet.

  11. Leadership for Sustainable Installations

    DTIC Science & Technology

    2011-04-01

    leading sustainable installations. What is Sustainability? Sustainability has its roots in the business world in the concept of corporate social ... responsibility (CSR). Cynics may say the CSR was a marketing ploy to establish a positive public perception of businesses in the wake of several well

  12. {open_quote}{open_quote}Hot spots{close_quote}{close_quote} effect in nuclear shadowing

    SciTech Connect

    Zhu, W.; Ruan, J. |

    1996-07-01

    Shadowing in inelastic lepton-nucleus scattering is analyzed by using the modified Gribov-Levin-Ryskin evolution equation. We find that a comparison of the structure functions between nuclear and proton targets at {ital x}{lt}10{sup {minus}3} and {ital Q}{sup 2}{approx_gt}1 GeV{sup 2} can provide useful information about the hot spots of the nucleon. {copyright} {ital 1996 The American Physical Society.}

  13. Nuclear battlefields

    SciTech Connect

    Arkin, W.M.; Fieldhouse, R.W.

    1985-01-01

    This book provides complete data on the nuclear operations and research facilities in the U.S.A., the U.S.S.R., France, China and the U.K. It describes detailed estimates on the U.S.S.R.'s nuclear stockpile for over 500 locations. It shows how non-nuclear countries cooperate with the world-wide war machine. And it maps the U.S. nuclear facilities from Little America, WY, and Charleston, SC, to the battleships patroling the world's oceans and subs stalking under the sea. The data were gathered from unclassified sources through the Freedom of Information Act, from data supplied to military installations, and from weapons source books. It provides guidance for policymakers, government and corporate officials.

  14. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  15. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lifts the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, up from the floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  16. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lifts the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  17. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    Construction workers wearing safety harnesses and tethered lines assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. They are securing the large bolts that hold the platform securely in place on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    A heavy-lift crane lifts the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the south side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be lowered into High Bay 3 for installation on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  20. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A crane lifts the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, high up in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B north platform will lowered into High Bay 3 for installation on the north side of the high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  1. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lifted up by crane in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be lowered into High Bay 3 and installed on the north side of the high bay. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  2. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  3. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    High up in High Bay 3 inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, has been lowered into place. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker makes adjustments to a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  5. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    Construction workers use specialized tools to help secure the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The D platform is being installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  6. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    Construction workers help to secure the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The D platform is being installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  8. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A construction worker monitors the progress, as a heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of High Bay 3. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  9. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    In this view from above, a heavy-lift crane lowers the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  11. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of High Bay 3. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  12. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lowered by crane for installation on the north side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker solders a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  15. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  16. Mineral mining installations

    SciTech Connect

    Werner, G.; Wisniewski, P.

    1983-12-15

    A mineral mining installation serves to win mineral by explosive blasting. The installation employs a shuttle conveyor arranged alongside a mineral face. Roof supports stand side-by-side at the side of the conveyor remote from the conveyor. The roof supports are connected to the conveyor through shifting rams and have roof-engageable caps or the like supported on hydraulic props. The pans of the conveyor have upstanding walls at the rear side nearest the roof supports which carry rails at their upper ends. The roof caps have wall components pivoted thereto and hydraulic piston and cylinder units serve to swing the wall components up and down. When explosive blasting takes place the wall components are swung down to engage on the walls of the conveyor pans to form a screen between the winning region and the access region of the working.

  17. Engineering and Installation Services

    DTIC Science & Technology

    2007-11-02

    Update data on existing communications and information systems on the Communica- tions and Information Systems Installation Records ( CSIR ) according to...information by two different survey methods: desk top and on-site. 4.9.1.1. Perform desktop surveys by using CSIRs , available data, and telephone...and equipment. 4.15. Project Drawings . Upon project completion, the team chief annotates two sets of CSIR drawings. The team chief leaves one set with

  18. Samus Toroid Installation Fixture

    SciTech Connect

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  19. Seafloor manifold center installed

    SciTech Connect

    Edmiston, K.

    1982-07-01

    The Shell/Esso Underwater Manifold Center (UMC), designed and tested as a diverless production facility, is a significant step toward really deep water oil and gas production. In May 1982, the 2100 metric ton unit was towed 645 miles from its Dutch fabrication yard and precisely emplaced in 500 ft water in the Cormorant field in only 6 days. When fully installed with all of its wells drilled and testing completed, the UMC will have cost an estimated $700 million. During its anticipated 25 yr operating life, the UMC is expected to produce ca 110 million bbl from the central Cormorant area. Design and operational criteria are described.

  20. Mineral mining installation

    SciTech Connect

    Plevak, L.; Weirich, W.

    1982-04-20

    A longwall mineral mining installation has a longwall conveyor and a plurality of roof support units positioned side-by-side at the goaf side of the conveyor. The hydraulic appliances of the roof support units, such as their hydraulic props, hydraulic advance rams and hydraulic control valves, are supplied with pressurized hydraulic fluid from hydraulic supply lines which run along the goaf side of the conveyor. A plurality of flat, platelike intermediate members are provided at the goaf side of the conveyor. These intermediate members are formed with internal ducts for feeding the hydraulic fluid from the supply lines to the hydraulic appliances of the roof support units.

  1. UIUC control console installation and upgrade

    SciTech Connect

    Holm, Richard L.

    1994-07-01

    The University of Illinois Nuclear Reactor Laboratory shutdown in March of 1993 to install the General Atomics digital control console. Two weeks of this period were devoted to refurbishment of the rod drives and two weeks were the actual installation of the console. Much of the wiring necessary to install the console was done during the period when the rod drives were being refurbished. A few mistakes were made along the way. 1) A 'repaired' extension cord was temporarily used to supply power to the DAC... the ground and neutral were reversed... this was not appreciated by the DAC{exclamation_point} We had to replace a couple of the boards in the DAC after that little fiasco. 2) The instrumentation cables for the rod drives were received with the plugs all connected and ready to install... except you can't put a two inch plug through a half inch conduit. We had to cut the plugs off, run the cable through the conduit, and then resolder the plugs on where the rod drive assembly connects (my privilege). 3) We had to replace the memory board in the NM1000 in order to prevent it from losing its mind every time it got turned off. 4) There were problems with the pulse data acquisition that were eventually traced to a problem in the ribbon cable between the mother and daughter boards. All in all the installation and operation of the console went fairly well. There are still occasional glitches, but none serious or excessively annoying. The console installation is part of an upgrade program to replace all of the instrumentation in the facility with the modern equivalent. The pressure and flow sensors, currently air operated, are being replaced with 4-20 ma transmitters for input into the control console and into a mimic board for the primary and secondary systems. Through the funding of the now defunct, temporarily we hope, Reactor Instrumentation Program we have upgraded our area radiation monitors as well. These upgrades provide us with more reliable equipment as well as

  2. Heating equipment installation system

    DOEpatents

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  3. Seal ring installation tool

    NASA Technical Reports Server (NTRS)

    Haselmaier, L. Haynes (Inventor)

    2004-01-01

    A seal ring tool that allows an installer to position a primary seal ring between hub ends of pipe flanges that are being assembled together. The tool includes a pivoting handle member and extension arms attached to the pivoting handle member. The ends of the arms have side indentation type longitudinal grooves angled toward one another for holding the primary seal ring in place between the hubs of respective pipes that are to be attached together. The arms of the tool can also have flat sides that can be used to abut against an optional second larger seal that is supported within a groove in one of the hub ends so that the second hub end can then be moved against the other side of the primary seal ring. Once the seal ring is positioned between the pipe hubs, the pipe hubs can be moved about the seal ring due to the flat sides of the arms of the tool. The tool eliminates the chances of damaging and contaminating seal rings being installed within pipe hubs that are being attached to one another.

  4. Radiator Design and Installation

    NASA Technical Reports Server (NTRS)

    Brevoort, M.J.; Leifer, M.

    1939-01-01

    The fundamental principles of fluid flow, pressure losses, and heat transfer have been presented and analyzed for the case of a smooth tube with fully developed turbulent flow. These equations apply to tubes with large length-diameter ratios where the f1ow is at a high Reynolds Number. The error introduced by using these equations increases as the magnitude of the tube length and the air-flow Reynolds Number approaches the values encountered in modern radiator designs. Accordingly, heat-transfer tests on radiator sections were made and the results are presented in nondimensional form to facilitate their use and for comparison with other heat-transfer data. In addition, pressure losses were measured along smooth tubes of circular, square, and rectangular cross section and the results were also correlated and are presented in nondimensional form. The problem of a radiator design for a particular installation is solved, the experimental heat-transfer and pressure-loss data being used, on a basis of power chargeable to the radiator for form drag, for propelling the weight, and for forcing the air through the radiator. The case of an installation within a wing or an engine nacelle is considered. An illustration of radiator design is carried through for an arbitrary set of conditions. Sufficient detail is given to enable the reader to reproduce the analysis for any given case.

  5. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    Inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, a construction worker watches as the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket is lowered into place in High Bay 3. Construction workers will secure the large bolts that hold the platform in place on the south wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  6. Installing fiber insulation

    NASA Technical Reports Server (NTRS)

    Wang, D. S.; Warren, A. D. (Inventor)

    1980-01-01

    A method for installing fragile, high temperature insulation batting in an elongated cavity or in a resilient wire sleeve to form a resilient seal. The batting is preformed to rough dimensions and wrapped in a plastic film, the film being of a material which is fugitive at a high temperature. The film is heat sealed and trimmed to form a snugly fit skin which overlaps at least at one end to permit attachment of a pull cord. The film absorbs the tensile force of pulling the film enclosed batting through the cavity or wire mesh sleeve and is subsequently driven off by high temperature baking, leaving only the insulation in the cavity or wire mesh sleeve.

  7. CATS Installed on ISS

    NASA Image and Video Library

    2017-09-28

    On Jan. 22, 2015, robotic flight controllers successfully installed NASA’s Cloud Aerosol Transport System (CATS) onboard the International Space Station. CATS will collect data about clouds, volcanic ash plumes and tiny airborne particles that can help improve our understanding of aerosol and cloud interactions, and improve the accuracy of climate change models. CATS had been mounted inside the SpaceX Dragon cargo craft’s unpressurized trunk since it docked at the station on Jan. 12. Ground controllers at NASA’s Johnson Space Center in Houston, Texas, used one of the space station’s robotic arms, called the Special Purpose Dexterous Manipulator, to extract the instrument from the capsule. The NASA-controlled arm passed the instrument to a second robotic arm— like passing a baton in a relay race. This second arm, called the Japanese Experiment Module Remote Manipulator System, is controlled by the Japanese Aerospace Exploration Agency. The Japanese-controlled arm installed the instrument to the Space Station’s Japanese Experiment Module, making CATS the first NASA-developed payload to fly on the Japanese module. CATS is a lidar remote-sensing instrument designed to last from six months to three years. It is specifically intended to demonstrate a low-cost, streamlined approach to developing science payloads on the space station. CATS launched aboard the SpaceX Dragon spacecraft on Jan. 10 at Cape Canaveral Air Force Station in Florida. To learn more about the impact of CATS data, visit: www.nasa.gov/cats/ NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  8. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  9. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  10. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  11. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  12. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  13. Mineral mining installation

    SciTech Connect

    Weirich, W.

    1984-01-24

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a springloaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  14. Mineral mining installation

    SciTech Connect

    Becker, K.; Rosenberg, H.; Weirich, W.

    1981-12-29

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (Either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a spring-loaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  15. Antares Fairing Installed

    NASA Image and Video Library

    2017-09-27

    The payload fairing is installed on the Orbital Sciences Antares rocket at the Horizontal Integration Facility at NASA's Wallops Flight Facility on Virginia's Eastern Shore, Tuesday, July 8, 2014. The Antares rocket is scheduled to roll-out to Virginia's Mid-Atlantic Regional Spaceport Pad 0A Wednesday, July 9, ahead of its scheduled launch July 11. The Antares rocket will carry Orbital's unmanned Cygnus spacecraft to the International Space Station. This Orbital-2 mission's cargo is more than 3,000 pounds of supplies for the station, including science experiments to expand the research capability of the Expedition 40 crew members aboard the orbiting laboratory, crew provisions, spare parts and experiment hardware. Credit: NASA's Wallops Flight Facility NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  16. Longwall mineral mining installation

    SciTech Connect

    Becker, K.; Beyer, H.

    1982-09-14

    A longwall mineral mining installation comprises a scraper-chain conveyor having a scraper assembly, a first straight conveyor portion extending along the longwall working, a second straight conveyor portion extending along a roadway positioned at one end of the longwall working, and a curved conveyor section connecting the two straight conveyor portions. A guide assembly is provided for guiding the scraper assembly around the curved conveyor section. A guide is fixed to the face side of the first straight conveyor portion, and a winning machine is reciprocable along the guide. A drive station is mounted on the goaf side of the first straight conveyor portion in the region of the curved conveyor section. A drive sprocket is rotatably mounted on the face side of the first straight conveyor portion in said region. The drive sprocket drives the winning machine via a drive chain. A drive shaft drivably connects the drive station and the drive sprocket. The drive station includes a drive motor whose axis of rotation is substantially parallel to the longitudinal axis of the first straight conveyor portion, and the guide is angled away from the first straight conveyor portion in said region.

  17. 75 FR 77017 - Nextera Energy Seabrook, LLC Seabrook Station Independent Spent Fuel Storage Installation; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY.... Nuclear Regulatory Commission (NRC, the Commission) now or hereafter in effect. Per 10 CFR part 72... installation (ISFSI) at power reactor sites to persons authorized to possess or operate nuclear power reactors...

  18. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  19. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  20. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  1. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  2. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units §...

  3. Proper Installation Improves Carpet Life.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Explains how proper carpet installation can add to carpet life; includes tips to consider before signing a carpet-installation purchasing agreement that can make the new carpet a better investment. Topics cover how color selection lengthens appearance life, the need for moisture testing, the importance of carpet seams in the purchasing process,…

  4. FDDI Installation and Performance Analysis

    DTIC Science & Technology

    1992-12-01

    controlled by a Motorola 68030 32-bit microprocessor which controls all of the onboard functions. The LANplex 5012 has 12 expansion slots on an...27 March 1990. [14] Sun FDDI/DX Software and Hardware Installation Guide. [15] LANplex 5004 and 5012 Installation Guide. [16] M68000 8-/16-132-Bit

  5. 78 FR 70077 - Issuance of Materials License for U.S. Army Installation Management Command

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... COMMISSION Issuance of Materials License for U.S. Army Installation Management Command AGENCY: Nuclear... INFORMATION CONTACT: Dominick Orlando, Office of Federal and State Materials and Environmental Management... application is included in the SER. The U.S. Army, Installation Management Command's request for a materials...

  6. Solar Installation Labor Market Analysis

    SciTech Connect

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  7. Installing Electronics in Juno Vault

    NASA Image and Video Library

    2010-12-16

    Technicians install components that will aid with guidance, navigation and control of NASA Juno spacecraft. Like most of Juno sensitive electronics, these components are situated within the spacecraft titanium radiation vault.

  8. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043691 (30 Sept. 2009) --- NASA astronaut Nicole Stott, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  9. Achieving Efficiencies in Army Installations.

    DTIC Science & Technology

    2007-11-02

    34" ’■■"■" 1 USAWC STRATEGY RESEARCH PROJECT Achieving Efficiencies in Army Installations by Richard Fliss Col. Richard M. Meinhart Project...government agency. STRATEGY RESEARCH PROJECT ACHIEVING EFFICIENCIES IN ARMY INSTALLATIONS BY RICHARD FLISS DISTRIBUTION STATEMENT A: Approved...for public release. Distribution is unlimited. DTIC QUALITY INSPECTED & USAWC CLASS OF 1998 U.S. ARMY WAR COLLEGE, CARLISLE BARRACKS, PA 17013-5050

  10. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  11. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  12. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  13. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  14. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  15. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b) Nuclear...

  16. Gas appliance and installation quality

    SciTech Connect

    Dance, E.W.G.; Mulholland, P.M.

    1988-01-01

    British Gas plc only sells and installs domestic gas appliances which conform to the requirements of a third party certification scheme. This involves type testing of appliance prototypes, assessment of the manufacturers quality system and quality auditing of production appliances. This certification is augmented by additional quality auditing of appliances both in the factory and at British Gas warehouses. In order to achieve the quality objectives of safety and customer satisfaction comprehensive installation procedures and practices have been developed which are designed to deal with large installation and servicing workload. The quality standards achieved are independently assessed by market research into customers reactions. This competence of service engineers is maintained and enhanced by regular training and education and high standards of performance at regional and local level are rewarded through annual national competitions.

  17. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Preclosure Radiological Safety § 960.5-2-4..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2... releases from other nuclear installations and operations that must be considered under the requirements...

  18. 76 FR 76327 - Installation of Radiation Alarms for Rooms Housing Neutron Sources

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION 10 CFR Part 73 Installation of Radiation Alarms for Rooms Housing Neutron Sources AGENCY: Nuclear Regulatory Commission. ACTION: Petition for rulemaking; request for comment. SUMMARY: The U.S....

  19. Nuclear reactor

    DOEpatents

    Wade, Elman E.

    1979-01-01

    A nuclear reactor including two rotatable plugs and a positive top core holddown structure. The top core holddown structure is divided into two parts: a small core cover, and a large core cover. The small core cover, and the upper internals associated therewith, are attached to the small rotating plug, and the large core cover, with its associated upper internals, is attached to the large rotating plug. By so splitting the core holddown structures, under-the-plug refueling is accomplished without the necessity of enlarging the reactor pressure vessel to provide a storage space for the core holddown structure during refueling. Additionally, the small and large rotating plugs, and their associated core covers, are arranged such that the separation of the two core covers to permit rotation is accomplished without the installation of complex lifting mechanisms.

  20. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  1. Aasgard subsea installation on schedule

    SciTech Connect

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  2. SUB-SLAB PROBE INSTALLATION

    EPA Science Inventory

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  3. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043681 (30 Sept. 2009) --- Canadian Space Agency astronaut Robert Thirsk, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  4. Temperature rise of installed FCC

    NASA Technical Reports Server (NTRS)

    Hankins, J. D.

    1976-01-01

    Report discusses temperature profiles of installed FCC for wood and tile surfaces. Three-conductor FCC was tested at twice nominal current-carrying capacity over bare floor and under carpet, with result indicating that temperature rise is not a linear function of current with FCC at this level.

  5. Rack installation in the JPM

    NASA Image and Video Library

    2008-06-04

    S124-E-006279 (4 June 2008) --- Japan Aerospace Exploration Agency (JAXA) astronaut Akihiko Hoshide, STS-124 mission specialist, smiles for a photo as he works in the newly installed Kibo Japanese Pressurized Module (JPM) of the International Space Station while Space Shuttle Discovery is docked with the station.

  6. Vessels installed at A-3

    NASA Image and Video Library

    2009-09-25

    Construction of the A-3 Test Stand approaches another milestone with delivery and installation of water, isopropyl alcohol (IPA) and liquid oxygen (LOX) tanks. The three LOX tanks shown on the left and the two IPA tanks shown on the right are all 35,000 gallons each. The four water tanks in the center are 39,000 gallons each.

  7. Horizontal drilling installs dutch waterline

    SciTech Connect

    Not Available

    1986-08-01

    A 32-in. potable water line system, installed by Van Eijk Leidingen B.V. in Holland, was laid through an intensively cultivated vegetable gardening area, and designed to furnish additional irrigation water. Using a horizontally drilled 42-in. hole under the Maasdijk, though a difficult job, reduced the length by more than 3 miles.

  8. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  9. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  10. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  11. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  12. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  13. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  14. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  15. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  16. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  17. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  18. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  19. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  20. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  1. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  2. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  3. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  4. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  5. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  6. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  7. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  8. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    SciTech Connect

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    The Polyarninsky Shipyard (sometimes called Navy Yard No. 10 or the Shkval Shipyard) has been designated as the recipient for Solid Radioactive Waste (SRW) management facilities under the Arctic Military Environmental Cooperation (AMEC) Program. The existing SRW storage site at this shipyard is filled to capacity, which is forcing the shipyard to reduce its submarine dismantlement activities. The Polyarninsky Shipyard Waste Management Installation is planned as a combination of several AMEC projects. It will have several elements, including a set of hydraulic metal cutting tools, containers for transport and storage, the Mobile Pretreatment Facility (MPF) for Solid Radioactive Waste, the PICASSO system for radiation monitoring, and a Waste Storage Facility. Hydraulically operated cutting tools can cut many metal items via shearing so that dusts or particulates are not generated. The AMEC Program procured a cutting tool system, consisting of a motor and hydraulic pumping unit, a 38-mm conduit-cutting tool, a 100- mm pipe-cutting tool, and a spreading tool all mounted on a wheeled cart. The vendor modified the tool system for extremely cold conditions and Russian electrical standards, then delivered the tool system to the Polyarninsky shipyard. A new container for transportation and storage of SRW and been designed and fabricated. The first 400 of these containers have been delivered to the Northern Fleet of the Russian Navy for use at the Polyarninsky Shipyard Waste Management Installation. These containers are cylindrical in shape and can hold seven standard 200-liter drums. They are the first containers ever certified in Russia for the offsite transport of military SRW. These containers can be transported by truck, rail, barge, or ship. The MPF will be the focal point of the Polyarninsky Shipyard Waste Management Installation and a key element in meeting the nuclear submarine dismantlement and waste processing needs of the Russian Federation. It will receive raw

  9. Engineering report for simulated riser installation

    SciTech Connect

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  10. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043705 (30 Sept. 2009) --- European Space Agency astronaut Frank De Winne (left foreground) and Canadian Space Agency astronaut Robert Thirsk (center foreground); along with NASA astronauts Nicole Stott and Michael Barratt, all Expedition 20 flight engineers, pose for a photo with the newly installed Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  11. Mounting clips for panel installation

    DOEpatents

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  12. Simplified installation of thrust bearings

    NASA Technical Reports Server (NTRS)

    Sensenbaugh, N. D.

    1980-01-01

    Special handling sleeve, key to method of installing thrust bearings, was developed for assembling bearings on shaft of low-pressure oxygen turbo-pump. Method eliminates cooling and vacuum-drying steps which saves time, while also eliminating possibility of corrosion formation. Procedure saves energy because it requires no liquid nitrogen for cooling shaft and no natural gas or electric power for operating vacuum oven.

  13. SSOD Removal and NRCSD Install

    NASA Image and Video Library

    2014-01-30

    ISS038-E-040103 (30 Jan. 2014) --- Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, prepares to install a Cubesat deployer, also known as the Small Satellite Orbital Deployer (SSOD), inside the airlock in the International Space Station's Kibo laboratory. The SSOD is scheduled to release a set of six tiny satellites known as NanoRacks Cubesats on Feb. 6. The Cubesats were delivered Jan. 12 aboard Orbital Sciences' Cygnus commercial cargo craft.

  14. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  15. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  16. Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

    SciTech Connect

    Trond Bjornard; Philip C. Durst

    2012-05-01

    This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a country’s safeguards agreement with

  17. 10 CFR 835.1304 - Nuclear accident dosimetry.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Nuclear accident dosimetry. 835.1304 Section 835.1304... Nuclear accident dosimetry. (a) Installations possessing sufficient quantities of fissile material to... nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals. (b)...

  18. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  19. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  20. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  1. Installation of Curiosity Wheels and Suspension

    NASA Image and Video Library

    2010-07-05

    With the wheels and suspension system already installed onto one side of NASA Mars rover Curiosity the previous day, spacecraft engineers and technicians prepare the other side mobility subsystem for installation on June 29, 2010.

  2. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  3. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  4. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  5. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  6. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  7. Automated solar collector installation design

    DOEpatents

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  8. Change-state selector installed

    SciTech Connect

    Craig, S.L.; Nolen, J.A.; Phillips, D.

    1995-08-01

    The installation and early operation of the new charge-state selector after the PII linac was described above. Previous to the use of this device all charge states of beams stripped between the PII and Booster linacs entered the Booster. The beam power of the unused charge states often caused quenching of superconducting solenoids in the Booster. This problem is completely eliminated by the charge-state selector. It also eliminates the need to use {open_quotes}guide beams{close_quotes} from the tandem when tuning heavy beams which required stripping.

  9. EVA 5 - Grunsfeld installs radiator

    NASA Image and Video Library

    2002-03-08

    STS109-315-007 (8 March 2002) --- Astronaut John M. Grunsfeld, STS-109 payload commander, anchored on the end of the Space Shuttle Columbia’s Remote Manipulator System (RMS) robotic arm, moves toward the giant Hubble Space Telescope (HST) temporarily hosted in the orbiter’s cargo bay. Astronaut Richard M. Linnehan (out of frame) works in tandem with Grunsfeld during this fifth and final session of extravehicular activity (EVA). Activities for the space walk centered around the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) to install a Cryogenic Cooler and its Cooling System Radiator.

  10. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  11. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  12. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  13. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  14. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  15. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  16. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  17. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  18. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  19. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  20. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  1. Sprinkler System Installer. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    Chinien, Chris; Boutin, France

    This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…

  2. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  3. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  4. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  5. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  6. Improve Carpet Life with Proper Installation.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Provides guidance on ways to extend carpet life in educational facilities by paying attention to the details of carpeting installation. Issues to consider include choosing carpeting to meet specific usage requirements, are fiber protectorants used, is the installation properly done by qualified installers, and is moisture testing done prior to…

  7. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2011-10-01 2011-10-01 false Radiotelephone installations. 183.392 Section...

  8. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2010-10-01 2010-10-01 false Radiotelephone installations. 183.392 Section...

  9. Vertical nuclear proliferation.

    PubMed

    Sidel, Victor W

    2007-01-01

    All the nuclear-weapon states are working to develop new nuclear-weapon systems and upgrade their existing ones. Although the US Congress has recently blocked further development of small nuclear weapons and earth-penetrating nuclear weapons, the United States is planning a range of new warheads under the Reliable Replacement Warhead programme, and renewing its nuclear weapons infrastructure. The United Kingdom is spending 1 billion pounds sterling on updating the Atomic Weapons Establishment at Aldermaston, and about 20 billion pounds sterling on replacing its Vanguard submarines and maintaining its Trident warhead stockpile. The US has withdrawn from the Anti-Ballistic Missile Treaty and plans to install missile defence systems in Poland and the Czech Republic; Russia threatens to upgrade its nuclear countermeasures. The nuclear-weapon states should comply with their obligations under Article VI of the Non-Proliferation Treaty, as summarised in the 13-point plan agreed at the 2000 NPT Review Conference, and they should negotiate a Nuclear Weapons Convention.

  10. VIRUS early installation and commissioning

    NASA Astrophysics Data System (ADS)

    Tuttle, Sarah E.; Hill, Gary J.; Vattiat, Brian L.; Lee, Hanshin; Drory, Niv; Kelz, Andreas; Ramsey, Jason; Peterson, Trent; Noyola, Eva; DePoy, Darren L.; Marshall, Jennifer L.; Chonis, Taylor S.; Dalton, Gavin; Fabricius, Maximilian; Farrow, Daniel; Good, John M.; Haynes, Dionne M.; Indahl, Briana; Jahn, Thomas; Kriel, Hermanus; Nicklas, Harald; Montesano, Francesco; Prochaska, Travis; Allen, Richard D.; Landriau, Martin; MacQueen, Phillip J.; Roth, Martin M.; Savage, Richard; Snigula, Jan M.

    2016-08-01

    VIRUS is a massively replicated spectrograph built for HETDEX, the Hobby Eberly Telescope Dark Energy Experiment. It consists of 156 channels within 78 units fed by 34944 fibers over the 22 arcminute field of the upgraded HET. VIRUS covers a relatively narrow bandpass (350-550nm) at low resolution (R 700) to target the emission of Lyman-alpha emitters (LAEs) for HETDEX. VIRUS is a first demonstration of industrial style assembly line replication in optical astronomy. Installation and testing of VIRUS units began in November of 2015. This winter we celebrated the first on sky instrument activity of the upgraded HET, using a VIRUS unit and LRS2-R (the upgraded facility Low Resolution Spectrograph for the HET). Here we describe progress in VIRUS installation and commissioning through June 2016. We include early sky data obtained to characterize spectrograph performance and on sky performance of the newly upgraded HET. As part of the instrumentation for first science light at the HET, the IFU fed spectrographs were used to test a full range of telescope system functionality including the field calibration unit (FCU).We also use placement of strategic IFUs to map the new HET field to the fiber placement, and demonstrate actuation of the dithering mechanism key to HETDEX observations.

  11. Wind profiler installed in Antarctica

    NASA Astrophysics Data System (ADS)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  12. Installation of an offshore structure

    SciTech Connect

    Will, S.A.; Young, C.E.

    1981-04-07

    In the installation of a jacket or substructure component of an offshore platform on the sea floor over an underwater fixture containing one or more wellheads, a jacket is first ballasted to rest in a vertical orientation on the sea floor. Power winches are mounted atop the jacket above the water line and anchored mooring lines are connected to the winches via fairlead sheaves which define points of attachment for the mooring lines to the jacket. The jacket is deballasted to float with a near sea bottom clearance and is maneuvered horizontally with the power winches toward the underwater fixture. Docking guides carried by the jacket engage vertical guideposts driven drilled into the sea floor at preselected locations relative to the underwater fixture to align the jacket with the underwater fixture. The jacket is then lowered into the desired on-bottom position during controlled ballasting procedures. Finally, piles are driven through hollow jacket columns to anchor the jacket to the sea bottom.

  13. Device for installing rocket engines

    NASA Technical Reports Server (NTRS)

    George, T. R., Jr. (Inventor)

    1976-01-01

    A device for installing rocket engines is reported that is supported at a cant relative to vertical by an axially extensible, tiltable pedestal. A lifting platform supports the rocket engine at its thrust chamber exit, including a mount having a concentric base characterized by a concave bearing surface, a plurality of uniformly spaced legs extended radially from the base, and an annular receiver coaxially aligned with the base and affixed to the distal ends of said legs for receiving the thrust chamber exit. The lifting platform rests on a seat concentrically related to the pedestal and affixed to an extended end portion thereof having a convex bearing surface mated in sliding engagement with the concave bearing surface of the annular base for accommodating a rocking motion of the platform.

  14. Energy recovery heat exchanger installation

    SciTech Connect

    Bradshaw, N.F.

    1983-08-16

    An installation is disclosed for energy recovery heat exchangers arranged to transfer heat into or out of air exhausted from an air handling system for paint spray booths. The system includes a collection chamber about which the intakes of a series of exhaust fans are arranged to draw exhaust air into an exhaust stack. Pairs of inclined wetted surface coil sets are mounted in the walls of the enclosures, each in communication with the intake of an exhaust fan so as to receive airflow of each exhaust fan. Each of the enclosures is provided with an access door to enable cleaning and other maintenance chores to be carried out on the coil sets and pivotally mounted blocking panels may be positioned to close off air flow across the coils and bypassing of the exhaust flow through the access doors in the event excessive overspray solids are present in the exhaust flow.

  15. Installing and maintaining gear pumps

    SciTech Connect

    Whitmire, K.

    1996-03-01

    While not as common as centrifugal pumps in the CPI, gear pumps play important roles in handling many of today`s more difficult-to-pump fluids. Because they operate at lower speeds -- generally, 900 rpm or less -- their seals and bearings tend to last longer than those of centrifugal models. In addition, unlike centrifugal pumps, gear pumps` flows are independent of their systems` pressure curves, and they can handle a wider range of viscosities. Although high-flow, low-head applications remain the domain of centrifugal pumps, the use of gear pumps is increasing in the chemical process industries (CPI). While some application boundaries between gears and centrifugals are blurring, there are some crucial differences between the way the two are operated and maintained -- for example, where pressure relief is concerned. This article provides a general summary of gear pump characteristics and applications, highlighting critical aspects of installation, operation and maintenance.

  16. Nuclear power and nuclear weapons

    SciTech Connect

    Vaughen, V.C.A.

    1983-01-01

    The proliferation of nuclear weapons and the expanded use of nuclear energy for the production of electricity and other peaceful uses are compared. The difference in technologies associated with nuclear weapons and nuclear power plants are described.

  17. Nuclear rights - nuclear wrongs

    SciTech Connect

    Paul, E.F.; Miller, F.D.; Paul, J.; Ahrens, J.

    1986-01-01

    This book contains 11 selections. The titles are: Three Ways to Kill Innocent Bystanders: Some Conundrums Concerning the Morality of War; The International Defense of Liberty; Two Concepts of Deterrence; Nuclear Deterrence and Arms Control; Ethical Issues for the 1980s; The Moral Status of Nuclear Deterrent Threats; Optimal Deterrence; Morality and Paradoxical Deterrence; Immoral Risks: A Deontological Critique of Nuclear Deterrence; No War Without Dictatorship, No Peace Without Democracy: Foreign Policy as Domestic Politics; Marxism-Leninism and its Strategic Implications for the United States; Tocqueveille War.

  18. Case Report: Silicatosis in a Carpet Installer

    PubMed Central

    Szeinuk, Jaime; Wilk-Rivard, Elizabeth J.

    2007-01-01

    Context Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. Case presentation We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Discussion Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Relevance to Clinical or Professional Practice Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung. PMID:17589602

  19. DoD Installation Energy Security

    DTIC Science & Technology

    2012-05-24

    Opportunities  New revenue streams ● DoD Drivers  Economics  Energy security Smart MicroGrids 3 Military Installations and Energy Markets...58.8 MW Military Installations Often Do Not Look Like Commercial Facilities 5 DoD and Microgrids ● Must include an interconnected set of loads...grid and the local utility market Primary goal of DoD installation microgrids is to provide energy security in a cost effective manner. 6

  20. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  1. Antispin-Tail-Parachute Installations

    NASA Technical Reports Server (NTRS)

    Seidman, Oscar; Kamm, Robert W.

    1943-01-01

    Although antispin tail parachutes have been used successfully in spin demonstrations for some time, very little published information is available concerning the size of parachute, the bridle-line length, and the type and location of pack to use for particular airplane. The present paper is an attempt to supply data relating to these factors. The paper is in two parts. The first part reviews the principles of operation of the antispin parachutes, views the principles of operation of the antispin parachutes, summarized available information on actual installations, and discusses parachute loads and pack locations. The second part of the paper reports on systematic tests in the NACA-15-foot and 20-foot free-spinning tunnels at the Langley memorial Aeronautical Laboratory to determine the minimum size and the optimum bridle-line lengths for antispin tail parachutes for current military airplanes. It is concluded that airplanes weighing between 7500 and 14,000 pounds require parachutes 8 feet in diameter and bridle-line lengths between 20 and 50 feet. A positive-ejection mechanism is desirable to throw the parachute clear of the tail and to assure rapid opening. The pack and attachment point must be so located that the equipment will not foul the tail surfaces.

  2. 10 CFR 35.2605 - Records of installation, maintenance, adjustment, and repair of remote afterloader units...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Records of installation, maintenance, adjustment, and repair of remote afterloader units, teletherapy units, and gamma stereotactic radiosurgery units. 35.2605 Section 35.2605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records §...

  3. Automated Installation Verification of COMSOL via LiveLink for MATLAB

    SciTech Connect

    Crowell, Michael W

    2015-01-01

    Verifying that a local software installation performs as the developer intends is a potentially time-consuming but necessary step for nuclear safety-related codes. Automating this process not only saves time, but can increase reliability and scope of verification compared to ‘hand’ comparisons. While COMSOL does not include automatic installation verification as many commercial codes do, it does provide tools such as LiveLink™ for MATLAB® and the COMSOL API for use with Java® through which the user can automate the process. Here we present a successful automated verification example of a local COMSOL 5.0 installation for nuclear safety-related calculations at the Oak Ridge National Laboratory’s High Flux Isotope Reactor (HFIR).

  4. Nuclear Medicine.

    ERIC Educational Resources Information Center

    Badawi, Ramsey D.

    2001-01-01

    Describes the use of nuclear medicine techniques in diagnosis and therapy. Describes instrumentation in diagnostic nuclear medicine and predicts future trends in nuclear medicine imaging technology. (Author/MM)

  5. Nuclear ventriculography

    MedlinePlus

    ... ventriculography (RNV); Multiple gate acquisition scan (MUGA); Nuclear cardiology; Cardiomyopathy - nuclear ventriculography ... 56. Udelson JE, Dilsizian V, Bonow RO. Nuclear cardiology. In: Bonow RO, Mann DL, Zipes DP, Libby ...

  6. Nuclear Medicine.

    ERIC Educational Resources Information Center

    Badawi, Ramsey D.

    2001-01-01

    Describes the use of nuclear medicine techniques in diagnosis and therapy. Describes instrumentation in diagnostic nuclear medicine and predicts future trends in nuclear medicine imaging technology. (Author/MM)

  7. Hydrophone localization for the newly installed CTBTO station HA04 using noise from the installation vessel

    NASA Astrophysics Data System (ADS)

    Nielsen, Peter; Haralabus, Georgios; Stanley, Jerry; Zampolli, Mario; Grenard, Patrick; Brown, David; Le Bras, Ronan; Amir, Menachem; Slava, Bereza; Bittner, Paulina; Gore, Jane; Wang, Haijun

    2017-04-01

    During December 2016, the cabled hydroacoustic station HA04 was installed close to the Crozet Islands, France, in the southern Indian Ocean as part of the Comprehensive Nuclear-Test-Ban Treaty Organization's (CTBTO) International Monitoring System (IMS) designed to detect nuclear explosions worldwide. The HA04 station consists of two triplets of cabled to shore hydrophones deployed north and south of Crozet. Each triplet forms a two kilometre triangular configuration positioned in the Sound Fixing and Ranging channel for optimum performance. The water depth is approximately 1200 m with the hydrophones connected to a riser cable of approximately 700 m in length. The deployment was conducted from a cable vessel utilising high precision global and dynamic positioning system to position the sensors as close as possible to the planned locations. Although high confidence in the sensor locations was achieved during the vessel operation, the locations were verified by independent means in order to refine sensor locations, optimize station performance, and to ensure that the deployment was within the tolerance of the terms of reference for the deployment. The alternative estimate of the individual sensor locations was formulated as a global optimization problem with 10 unknown parameters, i.e., latitude, longitude and depth for each sensor within a station and an effective sound speed value in water. The objective function was defined as a least-mean-square type error function between modelled and measured arrival times between pairs of hydrophones. The arrival times were obtained by cross-correlating radiated noise from the surface vessel deploying the sensors while performing a dedicated known track for the purpose of the hydrophone localization. Results from the hydrophone localization estimation are presented and compared to the planned positions together with uncertainty estimates caused by independent modelling and measurement errors.

  8. Nuclear data for nuclear transmutation

    SciTech Connect

    Harada, Hideo

    2009-05-04

    Current status on nuclear data for the study of nuclear transmutation of radioactive wastes is reviewed, mainly focusing on neutron capture reactions. It is stressed that the highest-precision frontier research in nuclear data measurements should be a key to satisfy the target accuracies on the nuclear data requested for realizing the nuclear transmutation.

  9. Nuclear data for nuclear transmutation

    NASA Astrophysics Data System (ADS)

    Harada, Hideo

    2009-05-01

    Current status on nuclear data for the study of nuclear transmutation of radioactive wastes is reviewed, mainly focusing on neutron capture reactions. It is stressed that the highest-precision frontier research in nuclear data measurements should be a key to satisfy the target accuracies on the nuclear data requested for realizing the nuclear transmutation.

  10. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  11. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  12. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  13. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  14. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  15. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  16. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  17. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  18. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  19. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  20. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  1. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  2. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  3. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  4. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  5. 14 CFR 171.113 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... periodically. (f) The facility must have the following ground-air or landline communication services: (1) At... communications from the airport served by the facility. The utilization of voice on the SDF should be determined...

  6. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... supplemented by (depending on the circumstances) the following ground-air or landline communications services... ground-air communications from the airport served by the facility. Voice on the aid controlled from the...

  7. 14 CFR 171.9 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric and safety codes, and the installation must meet at least the Federal Communication Commission's... following ground-air or landline communications services: (1) At facilities outside of and not immediately...

  8. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  9. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  10. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  11. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  12. Science Officer Whitson installs SUBSA in MSG

    NASA Image and Video Library

    2002-07-05

    ISS005-E-06787 (5 July 2002) --- Astronaut Peggy A. Whitson, Expedition Five flight engineer, works near the Microgravity Science Glovebox (MSG) in the Destiny laboratory on the International Space Station (ISS). Whitson spent much of the morning installing the Solidification Using a Baffle in Sealed Ampoules (SUBSA) experiment in the MSG. The SUBSA installation will be completed once the MSG is activated.

  13. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  14. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  15. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  16. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  17. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  18. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209 Installation...

  19. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209 Installation...

  20. Financial Institutions on DoD Installations

    DTIC Science & Technology

    1989-07-26

    Instructions 1000.10 and 1000.12 (references (b) and (c)). 5 4. Military disbursing offices, nonappropriated fund instrumentalities , and other DoD installation...offices, Agencies, and Departments performing functions on a DoD installation (including nonappropriated fund instrumentalities ); and their

  1. MSFC inspections of installed polyimide wire

    NASA Technical Reports Server (NTRS)

    Landers, Joe C.

    1994-01-01

    An alert was issued because of the arc-tracking possibilities of installed polyimide wire harnesses. MSFC undertook a program to try to enhance the safety and reliability of these harnesses. Photographs are presented showing the need for inspections of installed wiring harnesses.

  2. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  3. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    DTIC Science & Technology

    2015-09-01

    FINAL REPORT Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed ESTCP Project EW...ERDC-CERL, a definition of a “net zero energy installation” was proposed based on current realities at Army installations: The amount of fossil

  4. Prediction of the safety level to an installation of the tritium process through predictive maintenance

    SciTech Connect

    Anghel, V.

    2008-07-15

    The safety level for personnel and environment to a nuclear installation is given in generally by the technological process quality of operation and maintenance and in particular by a lot of technical, technological, economic and human factors. The maintenance role is fundamental because it has to quantify all the technical, economic and human elements as an integrated system for it creates an important feedback for activities concerning the life cycle of the nuclear installation. In maintenance activities as in any dynamic area, new elements appear continuously which, sometimes require new approaches. The theory of fuzzy logic and the software LabVIEW supplied to the Nuclear Detritiation Plant (NDP) is part of National Research and Development Inst. for Cryogenics and Isotopic Technologies-ICIT, Rm.Valcea, used for predictive maintenance to assure safety operation. The final aim is to achieve the best practices for maintenance of the Plant that processes tritium. (authors)

  5. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  6. Locating nuclear power plants underground.

    PubMed

    Scott, F M

    1975-01-01

    This paper reviews some of the questions that have been asked by experts and others as to why nuclear power plants are not located or placed underground. While the safeguards and present designs make such installations unnecessary, there are some definite advantages that warrant the additional cost involved. First of all, such an arrangement does satisfy the psychological concern of a number of people and, in so doing, might gain the acceptance of the public so that such plants could be constructed in urban areas of load centers. The results of these studies are presented and some of the requirements necessary for underground installations described, including rock conditions, depth of facilities, and economics.

  7. Vehicle Support Posts Installation at Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers at the Mobile Launcher at NASA's Kennedy Space Center in Florida, prepare to install vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  8. Debarment: A Guide for Installation Commanders

    DTIC Science & Technology

    2001-04-01

    U.S. v. May, et. al., 622 F.2d 1000 (1980), for the proposition that commanders —bar“ individuals from base, but see, Flower v. United States, 407 U.S...installations by order of the installation commander. In Flower v. United States,30 the Supreme Court began to clarify it‘s holding in McElroy, and...articulate the parameters within which an installation commander can operate in protecting assets and people under his command. In Flower , the Supreme

  9. FORCAST Camera Installed on SOFIA Telescope

    NASA Image and Video Library

    Cornell University's Faint Object Infrared Camera for the SOFIA Telescope, or FORCAST, being installed on the Stratospheric Observatory for Infrared Astronomy's 2.5-meter telescope in preparation f...

  10. Plazmennyi-Kristall-3 plus hardware installation

    NASA Image and Video Library

    2010-06-30

    ISS024-E-007108 (30 June 2010) --- Russian cosmonaut Alexander Skvortsov, Expedition 24 commander, installs hardware for the new Plasma Crystal-3 Plus experiment in the Poisk Mini-Research Module 2 (MRM2) of the International Space Station.

  11. Space Station Live: Installing the AMS

    NASA Image and Video Library

    PAO Officer Kyle Herring interviews NASA astronaut Mike Fincke about his contribution during STS-134, the shuttle mission that installed the Alpha Magnetic Spectrometer (AMS) in May 2011. As a miss...

  12. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be...

  13. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be...

  14. Concentrating solar collector-installation package

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Report contains general description of concentrating solar collector and tracking system kit, along with comprehensive drawings, instructions, and guidelines to assist in field assembly, installation, operation, and maintenance of system.

  15. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., unless the CFO determines that a longer period is required. Installment payments of less than $50 per... interest of the United States, paying special attention to applicable statutes of limitations....

  16. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... determines that a longer period is required. Installment payments of less than $50 per month generally will... accordance with the best interest of the United States, paying special attention to applicable statutes...

  17. Preparing to Install APXS Sensor Head

    NASA Image and Video Library

    2009-10-13

    Grad student Nicholas Boyd left and Principal Investigator Ralf Gellert, both of the University of Guelph, Ontario, Canada, prepare for the installation of the Alpha Particle X-ray Spectrometer sensor head during testing at NASA JPL.

  18. AERODYNAMICS OF POWER PLANT INSTALLATION, PART II.

    DTIC Science & Technology

    schemes on V/STOL aircraft at forward speeds; Lift-fan V/STOL propulsion and airframe integration; NASA research on the aerodynamics of jet VTOL engine installations; Experimental studies of VTOL fan-in-wing inlets.

  19. EPA RE-Powering Mapper Completed Installations

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.

  20. Hydrogen isotope separation installation for tritium facility

    SciTech Connect

    Andreev, B.M.; Perevezentsev, A.N.; Selivanenko, I.L.; Tenyaev, B.N.; Vedeneev, A.I.; Golubkov, A.N.

    1995-10-01

    The separation of hydrogen isotopes in the hydrogen-palladium system in sectioned separation columns with the simulation of counter-current isotopic exchange is described. The separation efficiency of sectioned columns is investigated with the experimental installation as a function of various parameters. The separation of deuterium-tritium mixtures with high tritium concentrations is tested with the pilot installation operating at room temperature and atmospheric hydrogen pressure. Due to very high separation efficiency, flexibility and simplicity of operation separation installations with sectioned columns are ideally suitable for tritium laboratories and facilities dealing with separation of hydrogen isotopes. Estimation of applicability of sectioned columns for regeneration of exhaust gas in a fuel cycle of thermonuclear reactors, such as JET and ITER, shows the number of advantages of separation installations with sectioned columns. 12 refs., 3 figs., 2 tabs.

  1. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  2. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  3. Installing SAM Instrument into Curiosity Mars Rover

    NASA Image and Video Library

    2011-01-18

    In this photograph, technicians and engineers inside a clean room at NASA Jet Propulsion Laboratory, Pasadena, Calif., position NASA Sample Analysis at Mars SAM above the mission Mars rover, Curiosity, for installing the instrument.

  4. Plant process computer replacements - techniques to limit installation schedules and costs

    SciTech Connect

    Baker, M.D.; Olson, J.L. )

    1992-01-01

    Plant process computer systems, a standard fixture in all nuclear power plants, are used to monitor and display important plant process parameters. Scanning thousands of field sensors and alarming out-of-limit values, these computer systems are heavily relied on by control room operators. The original nuclear steam supply system (NSSS) vendor for the power plant often supplied the plant process computer. Designed using sixties and seventies technology, a plant's original process computer has been obsolete for some time. Driven by increased maintenance costs and new US Nuclear Regulatory Commission regulations such as NUREG-0737, Suppl. 1, many utilities have replaced their process computers with more modern computer systems. Given that computer systems are by their nature prone to rapid obsolescence, this replacement cycle will likely repeat. A process computer replacement project can be a significant capital expenditure and must be performed during a scheduled refueling outage. The object of the installation process is to install a working system on schedule. Experience gained by supervising several computer replacement installations has taught lessons that, if applied, will shorten the schedule and limit the risk of costly delays. Examples illustrating this technique are given. This paper and these examples deal only with the installation process and assume that the replacement computer system has been adequately designed, and development and factory tested.

  5. Methods for protecting subsea pipelines and installations

    SciTech Connect

    Rochelle, W.R.; Simpson, D.M.

    1981-01-01

    The hazards for subsea pipelines and installations are described. Methods currently being used to protect subsea pipelines and installations are discussed with the emphasis on various trenching methods and equipment. Technical data on progress rates for trenching and feasible depths of trench are given. Possible methods for protection against icebergs are discussed. A case for more comprehensive data on icebergs is presented. Should a pipeline become damaged, repair methods are noted.

  6. Solar system installation at Louisville, Kentucky

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  7. Cathodic protection installation for underground storage tanks

    SciTech Connect

    Koszewski, L.

    1995-12-31

    The 1998 deadline is fast approaching for upgrading Underground Storage Tanks (USTs) with cathodic protection. With so many tanks requiring upgrades over the next few years, tank owners and operators will likely find a shrinking pool of quality cathodic protection installation contractors to perform the necessary upgrading. The proper installation of cathodic protection components is critical to long term effective operation of the cathodic protection system.

  8. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  9. Extending Installation Sustainability Beyond the Fenceline

    DTIC Science & Technology

    2010-06-01

    Office of the Assistant Secretary of the Army (Installations and Environment) DoD Executive Agent Extending Installation Sustainability Beyond...Technology Transition – Supporting DoD Readiness, Sustainability , and the Warfighter Report Documentation Page Form ApprovedOMB No. 0704-0188 Public...if it does not display a currently valid OMB control number. 1. REPORT DATE JUN 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010

  10. Water Sustainability Assessment for Ten Army Installations

    DTIC Science & Technology

    2011-03-26

    Limiting water conservation to the requirements of EO 13514 encou- rages installations to reach for the low hanging fruit . Technologies that have...ER D C/ CE RL T R- 11 -5 Water Sustainability Assessment for Ten Army Installations Co ns tr uc tio n En gi ne er in g R es...March 2011 Approved for public release; distribution is unlimited. ERDC/CERL TR-11-5 March 2011 Water Sustainability Assessment

  11. Nacap installs Norway's first land lines

    SciTech Connect

    Not Available

    1984-08-01

    Norway's first gas pipeline on land - forming a part of the Statpipe gas gathering, transportation, and treatment system - is currently being installed by Nacap BV under extremely unusual conditions, both in terms of terrain to be crossed and safety standards to be adhered to. Nacap is constructing the 12 mile long twin pipeline of 30 in. and 28 in. diameters, two-thirds of which run under three deep fjords. Special construction techniques used for installing the pipeline are described.

  12. Software Management Environment (SME) installation guide

    NASA Technical Reports Server (NTRS)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  13. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2010-10-01 2010-10-01 false Installation and details. 32.45-1 Section...

  14. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2011-10-01 2011-10-01 false Installation and details. 32.45-1 Section...

  15. Improved installation prototype for measurement of low argon-37 activity

    NASA Astrophysics Data System (ADS)

    Pakhomov, Sergei; Dubasov, Yuri

    2015-04-01

    On-site Inspection (OSI) is a key element of verification of State Parties' compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT). An on-site inspection is launched to establish whether or not a nuclear explosion has been carried out. One of the most significant evidence of n underground nuclear explosion (UNE) is detection above background concentrations of argon-37 in near surface air. Argon-37 is formed in large amounts at interaction of neutrons of UNE with the potassium which is a part of the majority of rocks. Its estimated contents for the 100th days after explosion with a energy of 1000 t of TNT near a surface can vary from 1 to 1000 mBq/m3. The background concentrations of argon-37 in subsoil air vary 1 do100 mBq/m3. Traditionally, for argon-37 activity measurement the gas-proportional counters are used. But at Khlopin Radium institute the developments of the new type of highly sensitive and low-background installation capable to provide the required range of measurements of the argon-37 concentration are conducted. The liquid scintillation method of the registration of the low-energetic argon-37 electrons is the basic installation principle and as scintillator, the itself condensed air argon sample is used. Registration of scintillations of liquid argon is made by means of system from 3 PMT which cathodes are cooled near to the temperature of liquid nitrogen together with the measuring chamber in which placed the quartz glass ampule, containing the measured sample of the liquefied argon. For converse the short wavelength photons (λ = 127 nm) of liquid argon scintillations to more long-wave, corresponding to the range of PMT sensitivity, the polymer film with tetra-phenyl-butadiene (TPB) is provided. Even the insignificant impurities of nitrogen, oxygen and others gaseous in the liquid argon samples can to cause the quenching of scintillation, especially their slow components. To account this effect and it influence on change of registration

  16. A novel design procedure for jacket installations

    SciTech Connect

    Christiansen, P.E.; Sterndorff, M.J.

    1995-12-31

    In the summer of 1994 the jacket and topsides for Total Oil Marine`s Dunbar field in the UK sector of the North Sea were successfully installed by Heeremac`s heavy lift barge DB102. The jacket was lifted off the transportation barge, upended from horizontal to vertical using a crane assisted ballasting procedure, and then installed in two steps over four pre-installed under-leg piles. The installation of the jacket was challenging since the life was utilizing the full crane capacity and also due to the soil conditions at the location, which made the docking procedure critical to achieve the required installation tolerances for tie-back of the pre-drilled wells. The SSCV assisted installation procedure was carefully deigned and analyzed by numerical calculations supplemented and supported by extensive physical model testing. This paper addresses the model test methodology with emphasis on the innovative procedures for testing and analyzing random, non-linear phenomena: impact loads during jacket lift-off from the barge and between jacket and piles during docking. The test program and the analysis demonstrated the importance of providing not just a single value but a sample of extreme values for a proper assessment of design loads that are generated by non-linear random processes. Whereas the results from the tests are specific for the jacket structure, the methodology is of general use for the industry.

  17. Installing and Running AIM 2.3.1 in a Clustered Server Production Environment

    SciTech Connect

    Walker, J.H.

    2003-09-11

    High availability and redundancy were required for a 24/7 technical baseline at a nuclear production facility. Process engineering, operations, and maintenance all had to connect to the AIM workflow and data management system at the plant. 24-hour availability and 100 percent data integrity were requirements. AIM 2.3.1 satisfied these needs by running in a clustered environment, using shared RAID 5 data storage installed with Oracle Fail Safe on clustered WinNT 4.0 Servers. Order of installation was critical for successful operation. The system has been running in production for 12 months with minimal downtime, and zero loss of data.

  18. 40 CFR 92.511 - Remanufactured locomotives: installation audit requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... locomotives: installation audit requirements. (a) Remanufacturers of locomotives or locomotive engines shall...: installation audit requirements. 92.511 Section 92.511 Protection of Environment ENVIRONMENTAL PROTECTION..., component settings and component installations on randomly chosen locomotives in an engine family....

  19. Information handbook on independent spent fuel storage installations

    SciTech Connect

    Raddatz, M.G.; Waters, M.D.

    1996-12-01

    In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

  20. Development of a coiled tubing cable installation system

    SciTech Connect

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  1. Nuclear Chemistry.

    ERIC Educational Resources Information Center

    Chemical and Engineering News, 1979

    1979-01-01

    Provides a brief review of the latest developments in nuclear chemistry. Nuclear research today is directed toward increased activity in radiopharmaceuticals and formation of new isotopes by high-energy, heavy-ion collisions. (Author/BB)

  2. Nuclear Scans

    MedlinePlus

    Nuclear scans use radioactive substances to see structures and functions inside your body. They use a special ... images. Most scans take 20 to 45 minutes. Nuclear scans can help doctors diagnose many conditions, including ...

  3. Nuclear Winter.

    ERIC Educational Resources Information Center

    Ehrlich, Anne

    1984-01-01

    "Nuclear Winter" was recently coined to describe the climatic and biological effects of a nuclear war. These effects are discussed based on models, simulations, scenarios, and projections. Effects on human populations are also considered. (JN)

  4. Nuclear Medicine

    MedlinePlus

    ... Home » Science Education » Science Topics » Nuclear Medicine SCIENCE EDUCATION SCIENCE EDUCATION Science Topics Resource Links for General Public Resource ... Related Documents: Nuclear Medicine Fact Sheet.pdf SCIENCE EDUCATION Science Topics Resource Links for General Public Resource ...

  5. Nuclear Chemistry.

    ERIC Educational Resources Information Center

    Chemical and Engineering News, 1979

    1979-01-01

    Provides a brief review of the latest developments in nuclear chemistry. Nuclear research today is directed toward increased activity in radiopharmaceuticals and formation of new isotopes by high-energy, heavy-ion collisions. (Author/BB)

  6. Nuclear Winter.

    ERIC Educational Resources Information Center

    Ehrlich, Anne

    1984-01-01

    "Nuclear Winter" was recently coined to describe the climatic and biological effects of a nuclear war. These effects are discussed based on models, simulations, scenarios, and projections. Effects on human populations are also considered. (JN)

  7. Nuclear weapons, nuclear effects, nuclear war

    SciTech Connect

    Bing, G.F.

    1991-08-20

    This paper provides a brief and mostly non-technical description of the militarily important features of nuclear weapons, of the physical phenomena associated with individual explosions, and of the expected or possible results of the use of many weapons in a nuclear war. Most emphasis is on the effects of so-called ``strategic exchanges.``

  8. Nuclear Fuels.

    ERIC Educational Resources Information Center

    Nash, J. Thomas

    1983-01-01

    Trends in and factors related to the nuclear industry and nuclear fuel production are discussed. Topics addressed include nuclear reactors, survival of the U.S. uranium industry, production costs, budget cuts by the Department of Energy and U.S. Geological survey for resource studies, mining, and research/development activities. (JN)

  9. Nuclear Fuels.

    ERIC Educational Resources Information Center

    Nash, J. Thomas

    1983-01-01

    Trends in and factors related to the nuclear industry and nuclear fuel production are discussed. Topics addressed include nuclear reactors, survival of the U.S. uranium industry, production costs, budget cuts by the Department of Energy and U.S. Geological survey for resource studies, mining, and research/development activities. (JN)

  10. Heterogeneous nuclear ribonucleoprotein A/B and G inhibits the transcription of gonadotropin-releasing-hormone 1

    PubMed Central

    Zhao, Sheng; Korzan, Wayne J.; Chen, Chun-Chun; Fernald, Russell D.

    2008-01-01

    Gonadotropin releasing hormone 1 (GnRH1) causes the release of gonadotropins from the pituitary to control reproduction. Here we report that two heterogeneous nuclear ribonucleoproteins (hnRNP-A/B and hnRNP-G) bind to the GnRH-I upstream promoter region in a cichlid fish, Astatotilapia burtoni. We identified these binding proteins using a newly developed homology based method of mass spectrometric peptide mapping. We show that both hnRNP-A/B and hnRNP-G co-localize with GnRH1 in the pre-optic area of the hypothalamus in the brain. We also demonstrated that these ribonucleoproteins exhibit similar binding capacity in vivo, using immortalized mouse GT1-7 cells where overexpression of either hnRNP-A/B or hnRNP-G significantly down-regulate GnRH1 mRNA levels in GT1-7 cells, suggesting that both act as repressors in GnRH1 transcriptional regulation. PMID:17920292

  11. VERA 3.5 Installation Guide

    SciTech Connect

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  12. Study on installation of the submersible mixer

    NASA Astrophysics Data System (ADS)

    Tian, F.; Shi, W. D.; He, X. H.; Jiang, H.; Xu, Y. H.

    2013-12-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice.

  13. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, the final four vehicle support posts are being installed on the deck of the mobile launcher. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  14. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare to install a vehicle support post. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  15. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    In view are three vehicle support posts installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  16. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    A construction worker on the deck of the mobile launcher welds a portion of a platform for installation of a vehicle support post at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  17. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare a platform for installation of a vehicle support post. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  18. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Four vehicle support posts have been installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  19. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, construction workers on the deck of the mobile launcher install the final four vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  20. Fluid assisted installation of electrical cable accessories

    DOEpatents

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  1. Nuclear Pasta

    NASA Astrophysics Data System (ADS)

    da Silva Schneider, Andre; Horowitz, Charles; Berry, Don; Briggs, Christian

    2014-03-01

    For decades it has been theorized that just below nuclear saturation density matter undergoes a series of phase transitions. These phases, which are expected to exist in core-collapse supernovae and neutron stars, involve a range of exotic nuclear shapes collectively known as nuclear pasta. Recently, Jose Pons and collaborators suggested that ``the maximum period of isolated X-ray pulsars may be the first observational evidence for an amorphous inner crust, ..., possibly owing to the existence of a nuclear pasta phase.'' In this talk we present results of semi-classical molecular dynamics simulations of nuclear pasta and discuss how each phase might contribute to neutron star crust properties.

  2. Risk assessment Barter Island radar installation, Alaska

    SciTech Connect

    1995-05-05

    This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Barter Island Distant Early Warning (DEW) Line radar installation. Fourteen sites at the Barter Island radar installation underwent remedial investigations (RIS) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Barter Island Remedial Investigation/Feasibility Study (RI/FS) United States Air Force 1994a. The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessment. The primary contaminants of concern at the 14 sites are diesel and gasoline from past spills and/or leaks. The general location of the Barter Island radar installation is shown in Figure 1-1. The 14 sites investigated and the types of samples collected at each site are presented in Table 1-1. The purpose of the risk assessment is to evaluate the human and ecological health risks that may be associated with chemicals released to the environment at the 14 sites investigated during the RIs. The risk assessment characterizes the probability that measured concentrations of hazardous chemical substances will cause adverse effects in humans or the environment in the absence of remediation. The risk assessment will be used to determine if remediation (site cleanup) is necessary and also to rank sites for remedial action. Additionally, it will be used as a model for the risk assessment to be performed at the other DEW Line installations (Bullen Point, Oliktok Point, Point Lonely, Barrow Point, Wainwright, and Point Lay) and the Cape Lisburne radar installation. pg18. JMD.

  3. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    SciTech Connect

    Not Available

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  4. Nuclear orientation and nuclear structure

    SciTech Connect

    Krane, K.S.

    1988-01-01

    The present generation of on-line nuclear orientation facilities promises to revolutionize the gathering of nuclear structure information, especially for the hitherto poorly known and understood nuclei far from stability. Following a brief review of the technological developments that have facilitated these experiments, the nuclear spectroscopic information that can be obtained is summarized. Applications to understanding nuclear structure are reviewed, and challenges for future studies are discussed. 14 refs., 4 figs., 3 tabs.

  5. PUREX exhaust ventilation system installation test report

    SciTech Connect

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment.

  6. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  7. Inflatable device for installing strain gage bridges

    NASA Technical Reports Server (NTRS)

    Cook, C. E.; Smith, G. E.; Monaghan, R. C. (Inventor)

    1983-01-01

    Methods and devices for installing in a tubular shaft multiple strain gages are disclosed with focus on a method and a device for pneumatically forcing strain gages into seated engagement with the internal surfaces of a tubular shaft in an installation of multiple strain gages in a tubular shaft. The strain gages or other electron devices are seated in a template-like component which is wrapped about a pneumatically expansible body. The component is inserted into a shaft and the body is pneumatically expanded after a suitable adhesive was applied to the surfaces.

  8. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians install thermal blankets around the area where several Nanoracks will be installed on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  9. Mars Reconnaissance Orbiter After Camera Installation

    NASA Image and Video Library

    2005-01-07

    A telescopic camera called the High Resolution Imaging Science Experiment, or HiRISE, was installed onto the main structure of NASA Mars Reconnaissance Orbiter on Dec. 11, 2004 at Lockheed Martin Space Systems, Denver, Colo. HiRISE is at the top of the spacecraft in this image. Some other large components, including solar panels and the high-gain antenna, had not yet been installed. The orbiter is scheduled for launch in August 2005 carrying six science instruments. Ball Aerospace and Technology Corp., Boulder, Colo., built HiRISE for the University of Arizona, Tucson, to supply for the mission. http://photojournal.jpl.nasa.gov/catalog/PIA07210

  10. Nuclear networking.

    PubMed

    Xie, Wei; Burke, Brian

    2017-07-04

    Nuclear lamins are intermediate filament proteins that represent important structural components of metazoan nuclear envelopes (NEs). By combining proteomics and superresolution microscopy, we recently reported that both A- and B-type nuclear lamins form spatially distinct filament networks at the nuclear periphery of mouse fibroblasts. In particular, A-type lamins exhibit differential association with nuclear pore complexes (NPCs). Our studies reveal that the nuclear lamina network in mammalian somatic cells is less ordered and more complex than that of amphibian oocytes, the only other system in which the lamina has been visualized at high resolution. In addition, the NPC component Tpr likely links NPCs to the A-type lamin network, an association that appears to be regulated by C-terminal modification of various A-type lamin isoforms. Many questions remain, however, concerning the structure and assembly of lamin filaments, as well as with their mode of association with other nuclear components such as peripheral chromatin.

  11. Nuclear power generation and fuel cycle report 1997

    SciTech Connect

    1997-09-01

    Nuclear power is an important source of electric energy and the amount of nuclear-generated electricity continued to grow as the performance of nuclear power plants improved. In 1996, nuclear power plants supplied 23 percent of the electricity production for countries with nuclear units, and 17 percent of the total electricity generated worldwide. However, the likelihood of nuclear power assuming a much larger role or even retaining its current share of electricity generation production is uncertain. The industry faces a complex set of issues including economic competitiveness, social acceptance, and the handling of nuclear waste, all of which contribute to the uncertain future of nuclear power. Nevertheless, for some countries the installed nuclear generating capacity is projected to continue to grow. Insufficient indigenous energy resources and concerns over energy independence make nuclear electric generation a viable option, especially for the countries of the Far East.

  12. Improvement of Ground Truth Classification of Soviet Peaceful Nuclear Explosions

    NASA Astrophysics Data System (ADS)

    Mackey, K. G.; Fujita, K.; Bergman, E.

    2016-12-01

    From the 1960's through the late 1980's, the Soviet Union conducted 122 Peaceful Nuclear Explosions across its territory. These PNEs are now very important to the seismological community as so-called Ground Truth (GT) events. The PNE locations are widely distributed, thus GT0-1 locations, meaning that true location is known to within 1 km or better, are used as calibration events for developing seismic velocity models, model validation, seismic discrimination, etc. The nuclear monitoring/verification community generally utilizes published lists of PNE locations as known or verified GT events, though in reality there are errors and some PNEs are poorly located. We have determined or validated GT0-1 locations for 85 of the Soviet PNEs. Some PNEs published as GT1 or better also have larger errors. Our locations were determined using an integrated approach encompassing published open literature, analysis of satellite imagery and regional seismic data. We have visited and verified 10 PNE sites across Kazakhstan and Ukraine, allowing GPS coordinates to be obtained in the field.

  13. Installment sales: How they relate to timberland

    Treesearch

    William C. Siegel

    2004-01-01

    If certain conditions are met, the gain recognized on the sale of real property-such as forest land and/or standing timber-can be spread over more than one year for income tax purposes. Such sales are referred to as "installment" or "deferred payment" contracts. An outright sale, on the other hand, triggers immediate recognition of all gain in the...

  14. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) § 171.159...

  15. Public Address Systems. Specifications - Installation - Operation.

    ERIC Educational Resources Information Center

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  16. MS Kavandi installs cables in Quest airlock

    NASA Image and Video Library

    2001-07-16

    S104-E-5104 (16 July 2001) --- Janet L. Kavandi, STS-104 mission specialist, connects cables and hoses from the newly installed Quest Airlock to Unity Node 1. Other STS-104 and Expedition Two crewmembers are visible in the background working in the Airlock.

  17. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  18. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... requirements. (a) The facility must be installed according to accepted good engineering practices, applicable electric and safety codes, and Federal Communications Commission requirements. (b) The facility must have a... communications or reliable communications (at least a landline telephone) from the airport to the nearest Federal...

  19. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.271 Section 171.271 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS...

  20. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  1. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  2. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  3. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  4. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  5. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  6. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  7. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  8. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  9. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  10. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  11. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  12. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  13. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  14. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  15. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  16. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  17. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  18. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  19. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  20. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  1. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  2. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  3. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  4. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  5. 5 CFR 831.1807 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Installment withholdings. 831.1807 Section 831.1807 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Agency Requests to OPM for Recovery of a Debt from the Civil...

  6. 5 CFR 845.407 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 845.407 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES RETIREMENT SYSTEM-DEBT COLLECTION Agency Requests to OPM for Recovery of a Debt From the Civil Service Retirement Fund § 845.407 Installment withholdings. (a) When possible, OPM...

  7. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  8. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  9. Standard hydrogen monitoring system equipment installation instructions

    SciTech Connect

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  10. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  11. installing the new T61p laptop

    NASA Image and Video Library

    2011-09-21

    ISS029-E-007213 (21 Sept. 2011) --- Japan Aerospace Exploration Agency astronaut Satoshi Furukawa, Expedition 29 flight engineer, installs a new T61p laptop to replace the previous A31p as OCA Router in the Joint Station LAN/Local Area Network (JSL LAN). The laptop is located in the hatch area of the Destiny laboratory of the International Space Station.

  12. installing the new T61p laptop

    NASA Image and Video Library

    2011-09-21

    ISS029-E-007212 (21 Sept. 2011) --- Japan Aerospace Exploration Agency astronaut Satoshi Furukawa, Expedition 29 flight engineer, installs a new T61p laptop to replace the previous A31p as OCA Router in the Joint Station LAN/Local Area Network (JSL LAN). The laptop is located in the hatch area of the Destiny laboratory of the International Space Station.

  13. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  14. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  15. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  16. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  17. Planning, Developing and Installing a Campus LAN.

    ERIC Educational Resources Information Center

    Foley, Francis

    Berry College (Georgia) installed a new library computer and operating system, connected five buildings via a campus local area network (LAN), added eight faculty/staff offices to the LAN, completed an Internet connection, and has a name server operating. The college has also established e-mail and limited campus accounts for 300 of its 2,000…

  18. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities § 171.29...

  19. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities § 171.29...

  20. A Principal's Guide to ILS Facilities Installation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.

    1992-01-01

    Outlines five facilities considerations that school principals need to address prior to the installation of an integrated learning system (ILS): (1) placement, i.e., labs or classrooms; (2) wiring; (3) environment, including furniture and noise; (4) security, including fire, theft, vandalism, and misuse; and (5) usability, including afterschool…

  1. Door Hardware and Installations; Carpentry: 901894.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in the selection, preparation, and installation of hardware for door assemblies. The course is divided into five blocks of instruction (introduction to doors and hardware, door hardware, exterior doors and jambs, interior doors and jambs, and a quinmester post-test) totaling…

  2. OSM's cone design and installation experience

    SciTech Connect

    Van Dyke, M.W.

    1983-06-29

    The concrete filled steel cone offers an alternative solution in sealing vertical mine shafts. This paper gives the design and installation experiences of the Office of Surface Mining when dealing with abandoned coal mines. This same solution can also be used with other types of shaft closures. 4 figures.

  3. Electron circuits: Semiconductor laser multiple use installation

    NASA Astrophysics Data System (ADS)

    Zhou, F.; Fan, J.; Weng, D.

    1983-04-01

    A light source for a multiple use installation using a same matter junction or different matter junction GaAlAs/GaAs semiconductor laser, which has the advantages of high interference resistance, long transmission distance (tens to hundreds of meters), good security, and low power consumption; in addition, the controller of the light source has multiple usages of alarming, switching and counting is presented. The multiple use installation can be used in control of breaking warps and counting on roving waste machines, warping machines and silk weaving machines in the textile industry; long distance speed measurement, alarming and counting in machinery, electricity and chemical industries; and alarming and control of water levels in reservoirs, rivers and water towers, as well as blockade alarming and control of important divisions. This multiple use installation is composed of two parts a laser emitter and a receiving device. The former component is used to produce the laser; after the receiver receives the laser, the installation completes operations of alarming, switching and counting.

  4. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... foundation or support and stabilization system that is to be used to install the home in accordance with the... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the roof load, wind load, and thermal zones that are applicable to the intended site; and (4)...

  5. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... foundation or support and stabilization system that is to be used to install the home in accordance with the... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the roof load, wind load, and thermal zones that are applicable to the intended site; and (4)...

  6. D0 Cryo CC Heater Installation

    SciTech Connect

    Urbin, J.; /Fermilab

    1991-03-16

    Nine pairs of heaters are installed in the bottom of the CC pressure vessel.The physical layout is shown in the CC internal development drawing, D0 dwg. 3740.510-ME-255523. Electrically the heater system is a delta configuration. Electrical details are found on D0 dwg. 3740.515EC-273761. The feedthrough connectors for power to the heaters are located in the instrumentation box. Connector positions are found on D0 dwg.3740.515-EC-273760. Original sketches for the above named drawings are included in this document. The heaters and wiring were cleaned various times prior to and after installation with ethyl a1chohol. At various stages in the installation hi-pot and continuity tests were successfully accomplished to verify the integrity of the system. The fmal hi-pot numbers are included in the documentation. The heaters and wiring are kept separated from thermometry and purity cell wiring by SS sheetmetal barriers. The fabrication, testing and installation was completed by M. Hentges and his crew from AD/Cryo.

  7. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary for...

  8. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary for...

  9. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary for...

  10. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... installations of new manufactured homes in a state without a qualifying installation program must itself have..., or other sales or storage lots, when the manufactured home is not serving as an occupied residence... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Licensing in HUD...

  11. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the aircraft must: (1) Be of a kind and design appropriate to its intended function. (2) Be installed according...

  12. 40 CFR 1036.130 - Installation instructions for vehicle manufacturers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Related Requirements § 1036.130 Installation instructions for vehicle manufacturers. (a) If... vehicle, as described in 40 CFR 1068.105.” (c) You do not need installation instructions for engines that... ensure that each installer is informed of the installation requirements....

  13. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  14. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  15. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  16. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  17. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  18. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  19. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  20. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  1. 26 CFR 1.6655-3 - Adjusted seasonal installment method.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... rule of section 6655(b) ($250,000 paid in each of the first and second installments less this paragraph... applied towards the first and second installments under the general rule of section 6655(b) ($250,000 paid... installment less amount applied towards the first, second, and third installments under the general rule of...

  2. 26 CFR 1.6655-3 - Adjusted seasonal installment method.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... rule of section 6655(b) ($250,000 paid in each of the first and second installments less this paragraph... applied towards the first and second installments under the general rule of section 6655(b) ($250,000 paid... installment less amount applied towards the first, second, and third installments under the general rule of...

  3. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2013-10-01 2013-10-01 false Gasoline engine installations. 58.10-5 Section...

  4. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section...

  5. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  6. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  7. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  8. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  9. Smoke Alarm Giveaway and Installation Programs

    PubMed Central

    Liu, Ying; Mack, Karin A.; Diekman, Shane T.

    2015-01-01

    Background The burden of residential fire injury and death is substantial. Targeted smoke alarm giveaway and installation programs are popular interventions used to reduce residential fire mortality and morbidity. Purpose To evaluate the cost effectiveness and cost benefit of implementing a giveaway or installation program in a small hypothetic community with a high risk of fire death and injury through a decision-analysis model. Methods Model inputs included program costs; program effectiveness (life-years and quality-adjusted life-years saved); and monetized program benefits (medical cost, productivity, property loss and quality-of-life losses averted) and were identified through structured reviews of existing literature (done in 2011) and supplemented by expert opinion. Future costs and effectiveness were discounted at a rate of 3% per year. All costs were expressed in 2011 U.S. dollars. Results Cost-effectiveness analysis (CEA) resulted in anaverage cost-effectiveness ratio (ACER) of $51,404 per quality-adjusted life-years (QALYs) saved and $45,630 per QALY for the giveaway and installation programs, respectively. Cost–benefit analysis (CBA) showed that both programs were associated with a positive net benefit with a benefit–cost ratio of 2.1 and 2.3, respectively. Smoke alarm functional rate, baseline prevalence of functional alarms, and baseline home fire death rate were among the most influential factors for the CEA and CBA results. Conclusions Both giveaway and installation programs have an average cost-effectiveness ratio similar to or lower than the median cost-effectiveness ratio reported for other interventionsto reduce fatal injuries in homes. Although more effort is required, installation programs result in lower cost per outcome achieved compared with giveaways. PMID:22992356

  10. Nuclear Halos

    SciTech Connect

    Vogt, Erich

    2010-07-27

    We show that extreme nuclear halos are caused only by pairs of s-wave neutrons (or single s-wave neutrons) and that such states occur much more frequently in the periodic table than previously believed. Besides lingering long near zero neutron separation energy such extreme halos have very remarkable properties: they can contribute significantly to the nuclear density at more than twice the normal nuclear radius and their spreading width can be very narrow. The properties of these states are primarily determined by the ''thickness'' of the nuclear surface in the mean-free nuclear potential and thus their importance increases greatly as we approach the neutron drip line. We discuss what such extreme halos are, where they occur, what their properties are and some of their impact on nuclear observations.

  11. Transactions of the American Nuclear Society. [1999 Winter Meeting.

    SciTech Connect

    Yoelin, C.A.

    1999-11-14

    Topics covered include: biology and medicine; decommissioning, decontamination, and reutilization; education and training; environmental sciences; fuel cycle and waste management; human factors; isotopes and radiation; materials science and technology; mathematics and computation; nuclear criticality safety; nuclear installations safety; operations and power; radiation protection and shielding; reactor physics; robotics and remote systems; thermal hydraulics; and electric power deregulation.

  12. Nuclear astrophysics

    SciTech Connect

    Haxton, W.C.

    1992-01-01

    The problem of core-collapse supernovae is used to illustrate the many connections between nuclear astrophysics and the problems nuclear physicists study in terrestrial laboratories. Efforts to better understand the collapse and mantle ejection are also motivated by a variety of interdisciplinary issues in nuclear, particle, and astrophysics, including galactic chemical evolution, neutrino masses and mixing, and stellar cooling by the emission of new particles. The current status of theory and observations is summarized.

  13. Nuclear astrophysics

    SciTech Connect

    Haxton, W.C.

    1992-12-31

    The problem of core-collapse supernovae is used to illustrate the many connections between nuclear astrophysics and the problems nuclear physicists study in terrestrial laboratories. Efforts to better understand the collapse and mantle ejection are also motivated by a variety of interdisciplinary issues in nuclear, particle, and astrophysics, including galactic chemical evolution, neutrino masses and mixing, and stellar cooling by the emission of new particles. The current status of theory and observations is summarized.

  14. Bubblers Speed Nuclear Waste Processing at SRS

    ScienceCinema

    None

    2016-07-12

    At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

  15. Design considerations in clustering nuclear rocket engines

    NASA Technical Reports Server (NTRS)

    Sager, Paul H.

    1992-01-01

    An initial investigation of the design considerations in clustering nuclear rocket engines for space transfer vehicles has been made. The clustering of both propulsion modules (which include start tanks) and nuclear rocket engines installed directly to a vehicle core tank appears to be feasible. Special provisions to shield opposite run tanks and the opposite side of a core tank - in the case of the boost pump concept - are required; the installation of a circumferential reactor side shield sector appears to provide an effective solution to this problem. While the time response to an engine-out event does not appear to be critical, the gimbal displacement required appears to be important. Since an installation of three engines offers a substantial reduction in gimbal requirements for engine-out and it may be possible to further enhance mission reliability with the greater number of engines, it is recommended that a cluster of four engines be considered.

  16. Design considerations in clustering nuclear rocket engines

    NASA Technical Reports Server (NTRS)

    Sager, Paul H.

    1992-01-01

    An initial investigation of the design considerations in clustering nuclear rocket engines for space transfer vehicles has been made. The clustering of both propulsion modules (which include start tanks) and nuclear rocket engines installed directly to a vehicle core tank appears to be feasible. Special provisions to shield opposite run tanks and the opposite side of a core tank - in the case of the boost pump concept - are required; the installation of a circumferential reactor side shield sector appears to provide an effective solution to this problem. While the time response to an engine-out event does not appear to be critical, the gimbal displacement required appears to be important. Since an installation of three engines offers a substantial reduction in gimbal requirements for engine-out and it may be possible to further enhance mission reliability with the greater number of engines, it is recommended that a cluster of four engines be considered.

  17. Nuclear Fission

    NASA Astrophysics Data System (ADS)

    Denschlag, J. O.

    This chapter first gives a survey on the history of the discovery of nuclear fission. It briefly presents the liquid-drop and shell models and their application to the fission process. The most important quantities accessible to experimental determination such as mass yields, nuclear charge distribution, prompt neutron emission, kinetic energy distribution, ternary fragment yields, angular distributions, and properties of fission isomers are presented as well as the instrumentation and techniques used for their measurement. The contribution concentrates on the fundamental aspects of nuclear fission. The practical aspects of nuclear fission are discussed in http://dx.doi.org/10.1007/978-1-4419-0720-2_57 of Vol. 6.

  18. Nuclear Safety

    SciTech Connect

    Silver, E G

    1989-01-01

    This document is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  19. Childhood leukemia around nuclear facilities.

    PubMed

    Hatch, M

    1992-12-15

    Epidemiologic studies on the health effects of living near nuclear facilities have been rare and, indeed, radiobiological models would not predict any detectable increase in cancer risk to the general public from the very low levels of radioactivity emitted by nuclear installations. Thus the recent evidence suggesting an excess of childhood leukemias in the vicinity of certain nuclear sites in the United Kingdom has generated considerable controversy. To help resolve the uncertainty and enhance interpretability of results, future epidemiologic studies will need to be designed with great care (and within realistic cost limits). This commentary suggests three areas for methodologic consideration: (i) definition and modelling of radiation exposure; (ii) selection of cancer sites and sensitive subgroups; and (iii) use of incidence or mortality data. Specific suggestions for further epidemiologic research are offered as well.

  20. Nuclear safety

    NASA Technical Reports Server (NTRS)

    Buden, D.

    1991-01-01

    Topics dealing with nuclear safety are addressed which include the following: general safety requirements; safety design requirements; terrestrial safety; SP-100 Flight System key safety requirements; potential mission accidents and hazards; key safety features; ground operations; launch operations; flight operations; disposal; safety concerns; licensing; the nuclear engine for rocket vehicle application (NERVA) design philosophy; the NERVA flight safety program; and the NERVA safety plan.