Afghan National Army: DOD Has Taken Steps to Remedy Poor Management of Vehicle Maintenance Program
2016-07-01
contract and program were designed to promote the accurate assessment of Afghan vehicle maintenance needs, contractor performance, and cost...containment; (2) the U.S. government provided effective management and oversight of contractor performance; and (3) the contract met its program objectives...maintenance, (2) underestimated the cost of spare parts, and (3) established performance metrics that did not accurately assess contractor performance or
Code of Federal Regulations, 2011 CFR
2011-10-01
.... The recipient shall be alert to organizational conflicts of interest as well as noncompetitive... to ensure objective contractor performance and eliminate unfair competitive advantage, contractors...
Code of Federal Regulations, 2011 CFR
2011-04-01
... organizational conflicts of interest as well as noncompetitive practices among contractors that may restrict or eliminate competition or otherwise restrain trade. In order to ensure objective contractor performance and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burdick, A.
This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an integrated whole house performance contracting company and identify the most significant challenges facing a traditional HVAC contractor looking to transition to a whole house performance contractor. To facilitate the discussion, IBACOS divided the business operations profile of a typical integrated whole house performance contracting company (one that performs both HVAC and shell repair/upgrade work) into seven Operational Areas with more detailed Business Functions and Work Activities falling under each high-level Operational Area. The expert panel was asked to review the operational profile or 'map' of the Business Functions. The specific Work Activities within the Business Functions identified as potential transition barriers were rated by the group relative to the value in IBACOS creating guidance ensuring a successful transition and the relative difficulty in executing.« less
2016-10-01
which contractors were providing services that are closely associated with inherently governmental functions, a key review objective to help ensure...or dinapolit@gao.gov. Why GAO Did This Study DOD is the government’s largest purchaser of contractor -provided services. In 2008, Congress...required DOD to compile and review an annual inventory of its contracted services to identify the number of contractors performing services and the
Optimal Contractor Selection in Construction Industry: The Fuzzy Way
NASA Astrophysics Data System (ADS)
Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.
2018-02-01
A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.
Code of Federal Regulations, 2010 CFR
2010-01-01
... performance, financial and technical resources or accessibility to other necessary resources. In certain... eliminate competition or otherwise restrain trade. In order to ensure objective contractor performance and...
Gharedaghi, Gholamreza; Omidvari, Manouchehr
2018-01-11
Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.
Report on audit of Department of Energy`s contractor salary increase fund
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-04
The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...
Code of Federal Regulations, 2012 CFR
2012-10-01
... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...
Code of Federal Regulations, 2014 CFR
2014-10-01
... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...
Code of Federal Regulations, 2011 CFR
2011-07-01
... practical, open and free competition. The recipient shall be alert to organizational conflicts of interest... otherwise restrain trade. In order to ensure objective contractor performance and eliminate unfair...
48 CFR 1509.170-8 - Contractor Performance Report.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2010 CFR
2010-10-01
... related performance budgets, resources, and schedules. It should provide a mutual understanding of the inherent risks in offerors'/contractors' performance plans and the underlying management control systems... objectives of the scope of work; (2) Adequacy of the time allocated for performing the defined tasks to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
CARTER, R.P.
1999-11-19
The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Struková, Zuzana
2013-06-01
Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...
76 FR 39015 - Contractor Performance Information
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Objective. 44.301 Section... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.301 Objective. The objective of... which the contractor spends Government funds and complies with Government policy when subcontracting...
Defining the performance gap: Conducting a self-assessment
NASA Technical Reports Server (NTRS)
Braymer, Susan A.; Stoner, David L.; Powell, William C.
1992-01-01
This paper presents two different approaches to performing self-assessments of continuous improvement activities. Case Study 1 describes the activities performed by JSC to assess the implementation of continuous improvement efforts at the NASA Center. The JSC approach included surveys administered to randomly selected NASA personnel and personal interviews with NASA and contractor management personnel. Case Study 2 describes the continuous improvement survey performed by the JSC Safety, Reliability, and Quality Assurance (SR&QA) organization. This survey consisted of a short questionnaire (50 questions) administered to all NASA and contractor SR&QA personnel. The questionnaire is based on the eight categories of the President's Award for Quality and Productivity Improvement. It is designed to objectively determine placement on the TQ benchmark and identify a roadmap for improvement.
Section 847 Requirements for Senior Defense Officials Seeking Employment with Defense Contractors
2016-03-31
847 Requirements for Senior Defense Officials Seeking Employment with Defense Contractors M A R C H 3 1 , 2 0 1 6 Report No. DODIG-2016-070...Senior Defense Officials Seeking Employment with Defense Contractors Visit us at www.dodig.mil March 31, 2016 Objectives The objectives of our project...description of future duties from a Defense contractor . • Some ethics officials issued nonspecific post-Government employment guidance as a Section 847
48 CFR 2937.602 - Elements of performance-based contracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...
Construction engineering inspection direct cost survey.
DOT National Transportation Integrated Search
2014-07-01
The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...
48 CFR 2452.209-72 - Organizational conflicts of interest.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., contractual or other interests are such that: (1) Award of the contract may result in an unfair competitive advantage; or (2) The Contractor's objectivity in performing the contract work may be impaired. (b) The...
76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...
48 CFR 1509.170-4 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... each performance category. Ratings are defined as follows: 0 = unsatisfactory, 1 = poor, 2 = fair, 3... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-4 Definitions. (a) Contractor Performance Report is an evaluation of a contractor's performance for a specified period of time...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
...; Submission for OMB Review; Contractors Performing Private Security Functions Outside the United States... new information collection requirement concerning Contractors Performing Private Security Functions... identified by Information Collection 9000- 0184, Contractors Performing Private Security Functions Outside...
48 CFR 1553.209-70 - EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., Contracting Officer's Evaluation of Contractor Performance. 1553.209-70 Section 1553.209-70 Federal... 1553.209-70 EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance. As prescribed... evaluation of Contractor performance. ...
48 CFR 1552.209-76 - Contractor performance evaluations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...
48 CFR 8.406-7 - Contractor Performance Evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the United.... 110-181, enacted January 28, 2008), section 862, entitled ``Contractors Performing Private Security... NDAA required standardization of rules for private security contractors that are performing in...
48 CFR 2936.201 - Evaluation of contractor performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
...] RIN 9000-AM20 Federal Acquisition Regulation; Contractors Performing Private Security Functions...-181). Section 862, entitled ``Contractors Performing Private Security Functions in Areas of Combat...), as amended, entitled ``Contractors Performing Private Security Functions in Areas of Combat...
48 CFR 3036.201 - Evaluation of contractor performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
... fallowing) from the Exchange Contractors to other CVP contractors, to Reclamation's Refuge Water Supply... of CVP water from the Exchange Contractors to: The RWSP to meet water supply needs (Incremental Level... objectives: Develop supplemental water supplies from willing seller agencies within the Exchange Contractors...
48 CFR 852.236-72 - Performance of work by the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...
Hilfiker reinforced soil embankment with full-height, cast-in-place concrete panels
DOT National Transportation Integrated Search
1992-05-01
The objective of this project was to evaluate the construction and performance of a full-height retaining wall system. The contractor chose to use the Hilfiker Reinforced Soil Embankment with cast-in-place, concrete panels. The project included three...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... Regulation; Contractor Comment Period, Past Performance Evaluations AGENCY: Department of Defense (DoD...) to implement provisions of law limiting the periods allowed for contractor comments on past....S.C. 2302 Note). Section 853, entitled ``Inclusion of Data on Contractor Performance in Past...
Heavy Equipment Operator: General Equipment Operator. Instructional Materials.
ERIC Educational Resources Information Center
Hendrix, Laborn J.; Sawatzky, Joyce
Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…
Development of a model to assess environmental performance, concerning HSE-MS principles.
Abbaspour, M; Hosseinzadeh Lotfi, F; Karbassi, A R; Roayaei, E; Nikoomaram, H
2010-06-01
The main objective of the present study was to develop a valid and appropriate model to evaluate companies' efficiency and environmental performance, concerning health, safety, and environmental management system principles. The proposed model overcomes the shortcomings of the previous models developed in this area. This model has been designed on the basis of a mathematical method known as Data Envelopment Analysis (DEA). In order to differentiate high-performing companies from weak ones, one of DEA nonradial models named as enhanced Russell graph efficiency measure has been applied. Since some of the environmental performance indicators cannot be controlled by companies' managers, it was necessary to develop the model in a way that it could be applied when discretionary and/or nondiscretionary factors were involved. The model, then, has been modified on a real case that comprised 12 oil and gas general contractors. The results showed the relative efficiency, inefficiency sources, and the rank of contractors.
48 CFR 970.4402-2 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402-2 General requirements. The following shall apply to the purchasing systems of management and operating contractors: (a) The objective of a management and operating contractor's purchasing system is to...
76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...
48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.
Code of Federal Regulations, 2013 CFR
2013-10-01
... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...
48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.
Code of Federal Regulations, 2012 CFR
2012-10-01
... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...
48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.
Code of Federal Regulations, 2011 CFR
2011-10-01
... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...
48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.
Code of Federal Regulations, 2014 CFR
2014-10-01
... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...
48 CFR 342.7002 - Procedures to be followed when a contractor fails to perform.
Code of Federal Regulations, 2010 CFR
2010-10-01
... when a contractor fails to perform. 342.7002 Section 342.7002 Federal Acquisition Regulations System... Procedures to be followed when a contractor fails to perform. (a) The Contracting Officer shall initiate immediate action to protect the Government's rights whenever the contractor fails to comply with either the...
48 CFR 1852.216-77 - Award fee for end item contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is “poor... the Contractor's interim performance every 6* months to monitor Contractor performance prior to...
Improving the Defense Acquisition System and Reducing System Costs
1981-03-30
The need for this specific commitment results from the competition among the conflicting objectives of high perform- ance, lower cost, shorter... conflict with initiatives to improve reliability and support. Whereas the fastest acquisition approach involves initiating production prxor to...their Individual thrusts result in confusion on the part of OASD who tries to implement conflicting programs, and of defense contractors performing
Heavy Equipment Operator Instructional Materials. Basic Core. Volume I.
ERIC Educational Resources Information Center
Hendrix, Laborn J.; Sawatzky, Joyce
Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…
77 FR 29983 - Federal Acquisition Regulation; Information Collection; Subcontract Consent
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-21
... performance of functions of the Federal Acquisition Regulation (FAR), and whether it will have practical... The objective of consent to subcontract, as discussed in FAR Part 44, is to evaluate the efficiency and effectiveness with which the contractor spends Government funds, and complies with Government...
Hsu, Pi-Fang; Wu, Cheng-Ru; Li, Ya-Ting
2008-01-01
While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derived to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... to adequately monitor contractor performance (for example, the day-to-day working proximity of the... contractor is responsible for timely contract performance. Performance monitoring by USAID does not obviate... contracting officer, will determine how to monitor the contractor's performance to protect the Government's...
48 CFR 236.201 - Evaluation of contractor performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTS Special Aspects of Contracting for Construction 236.201 Evaluation of contractor performance. (a) Preparation of performance evaluation reports. Use DD Form 2626, Performance Evaluation (Construction... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Evaluation of contractor...
Critical Electronic Data Loss Perceptions of United States Military Contractors
ERIC Educational Resources Information Center
Singletary, Tod J.
2017-01-01
The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, M.R.
1991-02-01
In recent years the NASA Langley Research Center has funded several contractors to conduct conceptual designs defining architectures for fault tolerant computer systems. Such a system is referred to as a Multi-Path Redundant Avionics Suite (MPRAS), and would form the basis for avionics systems that would be used in future families of space vehicles in a variety of missions. The principal contractors were General Dynamics, Boeing, and Draper Laboratories. These contractors participated in a series of review meetings, and submitted final reports defining their candidate architectures. NASA then commissioned the Research Triangle Institute (RTI) to perform an assessment of thesemore » architectures to identify strengths and weaknesses of each. This report is a separate, independent review of the RTI assessment, done primarily to assure that the assessment was comprehensive and objective. The report also includes general recommendations relative to further MPRAS development.« less
76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...
10 CFR 436.32 - Qualified contractors lists.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Qualified contractors lists. 436.32 Section 436.32 Energy... Procedures for Energy Savings Performance Contracting § 436.32 Qualified contractors lists. (a) DOE shall... energy savings performance contracts. (c) DOE may remove a firm from DOE's list of qualified contractors...
2017-03-07
H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee
48 CFR 1509.170-7 - Release of ratings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of... contacting the EPA contracting officer responsible for the evaluation. (b) Contractors' performance ratings... contract is located. Requests for past performance evaluations during the period the information may be...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...
48 CFR 252.225-7039 - Contractors performing private security functions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... by Contractors performing private security functions; (A) All armored vehicles, helicopters, and... private security functions. 252.225-7039 Section 252.225-7039 Federal Acquisition Regulations System... security functions. As prescribed in 225.370-6, insert the following clause: CONTRACTORS PERFORMING PRIVATE...
48 CFR 1509.170-7 - Release of ratings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Performance System will have direct access to all Reports, including those of EPA, in the National Institutes of Health's database. Information on EPA contractors' performance ratings may also be obtained by... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of...
48 CFR 642.1503-70 - Contractor Performance System (CPS).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor Performance System (CPS). 642.1503-70 Section 642.1503-70 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 642.1503...
48 CFR 36.201 - Evaluation of contractor performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...
48 CFR 836.501 - Performance of work by the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hsu, P.-F.; Wu, C.-R.; Li, Y.-T.
2008-07-01
While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derivedmore » to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.« less
48 CFR 752.7013 - Contractor-mission relationships.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...
Contractor Performed Quality Control on KyTC Projects.
DOT National Transportation Integrated Search
2002-08-01
This report addresses issues related to transferring the responsibility for quality control from the Kentucky Transportation Cabinet (KyTC) to construction contractors. : Several key topics related to Contractor Performed Quality Control (CPQC) are p...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 1509.170-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-2 Purpose. This subpart provides guidance to program and contracting personnel regarding the evaluation of contractor performance. It...
48 CFR 852.237-70 - Contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...
48 CFR 52.246-1 - Contractor Inspection Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...
48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...
48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...
48 CFR 1509.170-1 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-1 Section 1509.170-1 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-1 Scope of subpart. This subpart establishes EPA policy and procedures for evaluation of contractor performance...
48 CFR 1509.170-3 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-3 Applicability. (a) This....604 provides detailed instructions for architect-engineer contractor performance evaluations. (b) The... simplified acquisition procedures do not require the creation or existence of a formal database for past...
48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...
48 CFR 1509.170-6 - Filing of forms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...
48 CFR 752.7013 - Contractor-mission relationships.
Code of Federal Regulations, 2011 CFR
2011-10-01
....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas... contract, and for advising USAID regarding the performance of the work under the contract and its effect on... of academic freedom. Notwithstanding these academic freedoms, the Contractor's employees, while in...
Staffing for Cyberspace Operations: Summary of Analysis
2016-08-01
appropriate total force mix, defined as the choice between military, civilian, and contractor performance of DoD activities, is a key component in this...designated for civilian performance if the requirement is inherently governmental or subject to least-cost government civilian or contractor performance if...activities open to the least costly performance type (government civilian or contractor ). To understand the CMF mission requirements, we studied existing
Issues With Access to Acquisition Data and Information in the Department of Defense
2017-01-01
both procurement and operations), technical performance, contracts and contractor performance, and program decision memo- randa. These data are...the cost of weapon systems (both procurement and operations), techni- cal performance, contracts and contractor performance, and program decision...and tracking sensitive data, and 19 percent have no method at all (Trustwave, 2014, p. 4; Kerner, 2014). U.S. defense contractors face similar
DOE Office of Scientific and Technical Information (OSTI.GOV)
Melancon, R.
In June, 1995, the National Petroleum Refiners Association (NPRA) adhoc committee on Contractor Safety Training, turned over the task of developing reciprocity agreements with all Contractor Safety Training Councils to the Executive Directors of each of the Council`s. The Council representatives were to develop these agreements based on the NPRA adhoc committee training objectives that were developed jointly by representatives of the petroleum industry, chemical industry, contractors and the Council`s.
Cost Allocation and Overpricing of Spare Parts.
1986-09-01
5 defense contractors are presently treating spare parts as cost objectives and using a type of spare parts accounting system as described in the...survey instrument. The other 7 contractor respondents who do not treat spare parts as cost objectives were not favor- able to this accounting treatment...company accounting systems or lised to resolve specific contract or formula pricing cost allocation issues, contribute signi- ficantly to overpricing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-12
...; Preventing Personal Conflicts of Interest for Contractor Employees Performing Acquisition Functions AGENCY... approve a new information collection requirement regarding Preventing Personal Conflicts of Interest for... Conflicts of Interest for Contractor Employees Performing Acquisition Functions by any of the following...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Contractors. 68.87 Section 68.87... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This section applies to contractors performing maintenance or repair, turnaround, major renovation, or...
Energy Monitoring and Control Systems--Performance Verification and Endurance Test Procedures.
1982-12-01
EM-; tK2 s) trave h.en loadted in qvstem sit ~rp sm:l , o,1 ti-’.~ -1 rouiitthe factoz’, lest. E.VEF.NT Comnmwid the system to display the status of...contractor correction of all outstanding deficiencies . 163 TEST NO: END-i Page I of 1 OBJECTIVE: To demonstrate EMCS normal mode operation 24 TITLE: Endurance
14 CFR 1274.504 - Competition.
Code of Federal Regulations, 2010 CFR
2010-01-01
... alert to organizational conflicts of interest as well as noncompetitive practices among contractors that... contractor performance and eliminate unfair competitive advantage, contractors that develop or draft...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...
2003-05-01
space requires both contractors---at least until sustainable performance is demonstrated • EELV program has occurred in highly cost constrained...both contractors • Take necessary actions to assure both contractors remain viable---at least until sustainable performance is demonstrated
48 CFR 1509.170-8 - Contractor Performance Report.
Code of Federal Regulations, 2011 CFR
2011-10-01
... electronically by use of the National Institutes of Health's Contractor Performance System. Hard copy preparation... Service Center with specific instructions if hard copy use becomes necessary. (b) The performance...
NASA Astrophysics Data System (ADS)
Oo, B. L.; Yan, Y.
2018-04-01
There are many variables that public clients need to consider in their bidding procedure to enhance efficiency in their procurement for construction services. This paper focusses on the competitive bidding process for public sector procurement of construction services in Singapore. A distinctive feature of the Singapore government competitive bidding process is that full bidding feedback information is released to all competing bidders (and public). The specific objectives are: (i) to examine the degree of competition in the construction markets; and (ii) to examine the bidding performance of competing bidders. Based on a collection of bidding data for a 15-month period, the results show the market environment of the Singapore public sector construction contracting is highly competitive with long bidder lists. In selection of contractors, only 50% of the contracts were awarded to lowest bidders. The results also show that the competing contractors can be broadly classified into three groups based on their bidding performance in terms of number of bidding attempts, bidding success rate and bidding competitiveness. These results provide a useful insight into the bidding competition in the Singapore public sector construction contracting, especially to new market entrants and foreign contractors who want to bid for jobs in Singapore.
DOT National Transportation Integrated Search
2006-02-01
In order to ensure top quality construction projects, contracts need to be awarded to the most qualified : contractor. At the time of this research, NMDOT projects often went to the lowest, not necessarily the : most qualified, bidder. The objective ...
48 CFR 1845.506-70 - Responsibilities of the plant clearance officer.
Code of Federal Regulations, 2011 CFR
2011-10-01
... performance in property disposal activities; (h) Determining the method of disposal; (i) Surveillance of any contractor conducted sales; (j) Accounting for all contractor inventory reported by the contractor; (k... inventory; (l) Approving the method of sale, evaluating bids, and approving sale prices for any contractor...
12 CFR 367.9 - Imputation of causes.
Code of Federal Regulations, 2014 CFR
2014-01-01
... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...
12 CFR 367.9 - Imputation of causes.
Code of Federal Regulations, 2012 CFR
2012-01-01
... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...
12 CFR 367.9 - Imputation of causes.
Code of Federal Regulations, 2013 CFR
2013-01-01
... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...
12 CFR 367.9 - Imputation of causes.
Code of Federal Regulations, 2011 CFR
2011-01-01
... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...
12 CFR 367.9 - Imputation of causes.
Code of Federal Regulations, 2010 CFR
2010-01-01
... entity's performance of duties for or on behalf of the contractor, or with the contractor's knowledge... evidence of such knowledge, approval, or acquiescence. (b) Where there is cause to suspend and/or exclude... management official of a contractor who participated in, knew of or had reason to know of the contractor's...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... Response Contractors AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and... of a registry of disaster response contractors. DATES: Effective Date: August 2, 2010. FOR FURTHER..., requires the establishment and maintenance of a registry of contractors willing to perform debris removal...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
... Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor Personnel AGENCIES... of collecting from contractors all forms of Government provided identification once they are no..., titled Controls Over the Contractor Common Access Card (CAC) Life Cycle, was performed to determine...
48 CFR 52.236-6 - Superintendence by the Contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...
Code of Federal Regulations, 2011 CFR
2011-10-01
... aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for... all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for... all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23... feasibility study yourself or though a contractor, Reclamation will evaluate whether you, your technical staff, or contractor are qualified to perform the appraisal investigation or feasibility study based on...
30 CFR 46.12 - Responsibility for independent contractor training.
Code of Federal Regulations, 2010 CFR
2010-07-01
... providing new miner training, newly hired experienced miner training, new task training, and annual... which the contractor is aware that may be created by the performance of the contractor's work at the...
48 CFR 22.1704 - Violations and remedies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...
48 CFR 22.1704 - Violations and remedies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...
48 CFR 22.1704 - Violations and remedies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...
48 CFR 22.1704 - Violations and remedies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...
48 CFR 22.1704 - Violations and remedies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... commercial sex act during the period of performance of the contract; (3) The contractor, contractor employee... contractor fails to comply with the requirements of the clause at 52.222-50, Combating Trafficking in Persons...
48 CFR 436.201 - Evaluation of contractor performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Construction 436.201 Evaluation of contractor performance. Preparation of performance evaluation reports. In addition to the requirements of FAR 36.201, performance evaluation reports shall be prepared for indefinite... of services to be ordered exceeds $500,000.00. For these contracts, performance evaluation reports...
Means of Effective Security Sector Reform: A Comparison of US Military and Contractor Programs
2011-05-19
the US Army took over 400 suspension / debarment actions in fiscal year 2010.65 GAO report 11-419T, Foreign Operations: Key Issues for Congressional...Contracting, Ensuring Contractor Accountability: Past Performance and Suspension & Debartment, Testimony, (Washington, D.C.: Commission on Wartime...64 Ibid., 8. 65 Commission on Wartime Contracting, Ensuring Contractor Accountability: Past Performance and Suspension
48 CFR 2942.1503 - Procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...
48 CFR 2942.1503 - Procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...
48 CFR 2942.1503 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...
48 CFR 2942.1503 - Procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...
48 CFR 2942.1503 - Procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... at least annually for submission to the Past Performance Information Retrieval System (PPIRS), and... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1503 Procedures. (a) In accordance with... criteria within their contracting activities. (d) Release of contractor performance evaluation information...
Code of Federal Regulations, 2011 CFR
2011-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2014 CFR
2014-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2013 CFR
2013-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2012 CFR
2012-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Improvement of force health protection through preventive medicine oversight of contractor support.
Mower, Scott A
2009-01-01
Unprecedented numbers of contractors are used throughout the Iraq theater of operations to alleviate military manpower shortages. At virtually every major forward operating base, US-based contractors perform the preponderance of essential life support services. At more remote sites, local national contractors are increasingly relied upon to maintain chemical latrines, remove trash, deliver bulk water, and execute other janitorial functions. Vigorous oversight of contractor performance is essential to ensure services are delivered according to specified standards. Poor oversight can increase the risk of criminal activities, permit substandard performance, elevate disease and nonbattle injury rates, degrade morale, and diminish Soldier readiness. As the principal force health protection proponents in the Department of Defense, preventive medicine units must be tightly integrated into the oversight processes. This article defines the force health protection implications associated with service contracts and provide recommendations for strengthening preventive medicine's oversight role.
Code of Federal Regulations, 2010 CFR
2010-10-01
... or refusal of the Contractor to— (A) Present a detailed recommendation for corrective action as... the Contractor must remedy the failure or refusal specified in the notice. (6) If the Contractor does... entitled to reimbursement from the Contractor, or from the proceeds, for the reasonable expenses of care...
Code of Federal Regulations, 2011 CFR
2011-10-01
... or refusal of the Contractor to— (A) Present a detailed recommendation for corrective action as... the Contractor must remedy the failure or refusal specified in the notice. (6) If the Contractor does... entitled to reimbursement from the Contractor, or from the proceeds, for the reasonable expenses of care...
Current information technology needs of small to medium sized apparel manufacturers and contractors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wipple, C.; Vosti, E.
1997-11-01
This report documents recent efforts of the American Textile Partnership (AMTEX) Demand Activated Manufacturing Architecture (DAMA) Project to address needs that are characterized of small to medium sized apparel manufactures and contractors. Background on the AMTEX/DAMA project and objectives for this specific efforts are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thien, Mike G.; Barnes, Steve M.
2013-07-01
The Hanford Tank Operations Contractor (TOC) and the Hanford Waste Treatment and Immobilization Plant (WTP) contractor are both engaged in demonstrating mixing, sampling, and transfer system capabilities using simulated Hanford High-Level Waste (HLW) formulations. This represents one of the largest remaining technical issues with the high-level waste treatment mission at Hanford. Previous testing has focused on very specific TOC or WTP test objectives and consequently the simulants were narrowly focused on those test needs. A key attribute in the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2 is to ensure testing is performed with a simulant that represents the broadmore » spectrum of Hanford waste. The One System Integrated Project Team is a new joint TOC and WTP organization intended to ensure technical integration of specific TOC and WTP systems and testing. A new approach to simulant definition has been mutually developed that will meet both TOC and WTP test objectives for the delivery and receipt of HLW. The process used to identify critical simulant characteristics, incorporate lessons learned from previous testing, and identify specific simulant targets that ensure TOC and WTP testing addresses the broad spectrum of Hanford waste characteristics that are important to mixing, sampling, and transfer performance are described. (authors)« less
The nexus between OSH and subcontracting.
Nunes, Isabel L
2012-01-01
Subcontracting of specialized functions to external companies (e.g. cleaning or maintenance) is actually very common within several industries. These external companies' are called contractors and their contracting is often designated as outsourcing. Frequently contractors involve other companies (the sub-contractors) to assist them in fulfilling the contract, resulting in a complex chain of organizations focused on interchange of work - the contracting chain. Therefore in the same work site can coexist workers form the client-company and workers from the contractors and/or subcontractors. Since contractors perform their job in client's facilities, they can be exposed to hazards that are unknown to them. On other hand, workers of the client company can also be exposed to hazardous situations derived from the work performed by the contractors. The paper discusses how adequate occupational safety and health conditions can be assured when dealing with this kind of dynamic labor networks. Two case-studies and several examples coming from international literature will be presented.
2017-02-01
must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool
Epileptic Seizure Forewarning by Nonlinear Techniques
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hively, L.M.
2002-04-19
This report describes work that was performed under a Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC (Contractor) and a commercial participant, VIASYS Healthcare Inc. (formerly Nicolet Biomedical, Inc.). The Contractor has patented technology that forewarns of impending epileptic events via scalp electroencephalograph (EEG) data and successfully demonstrated this technology on 20 datasets from the Participant under pre-CRADA effort. This CRADA sought to bridge the gap between the Contractor's existing research-class software and a prototype medical device for subsequent commercialization by the Participant. The objectives of this CRADA were (1) development of a combination of existing computer hardware andmore » Contractor-patented software into a clinical process for warning of impending epileptic events in human patients, and (2) validation of the epilepsy warning methodology. This work modified the ORNL research-class FORTRAN for forewarning to run under a graphical user interface (GUI). The GUI-FORTRAN software subsequently was installed on desktop computers at five epilepsy monitoring units. The forewarning prototypes have run for more than one year without any hardware or software failures. This work also reported extensive analysis of model and EEG datasets to demonstrate the usefulness of the methodology. However, the Participant recently chose to stop work on the CRADA, due to a change in business priorities. Much work remains to convert the technology into a commercial clinical or ambulatory device for patient use, as discussed in App. H.« less
NASA Technical Reports Server (NTRS)
Kerby, Jerald; Counts, Stacy
2005-01-01
IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.
Performance-Based Contractor Prequalification as an Alternative to Performance Bonds
DOT National Transportation Integrated Search
2014-08-01
State departments of transportation rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in providing guidance that State transporta...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 951.101 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 951.101 Policy. (a) It is Department of Energy (DOE) policy that contractors performing under cost-reimbursement contracts should meet...
Contractor assistance in highway maintenance : state-of-the-art evaluation.
DOT National Transportation Integrated Search
1980-01-01
The purpose of this study was to perform a state-of-the art evaluation of contractor assistance in Virginia's highway maintenance. The study revealed that expenditures for contractor assistance accounted for 2.79% of the total expenditure on ordinary...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... delivery schedules. (32) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors... performance in the areas of design, development, and production. (41) Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development...
NASA Technical Reports Server (NTRS)
Schmahl, Karen E.
2002-01-01
The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.
NASA Technical Reports Server (NTRS)
Schmahl, Karen E.
2001-01-01
The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 742.1502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 742.1502 Policy. (a) USAID contracting... prescribed by the NIH Contractor Performance System. (Access to the system by USAID contracting office...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 742.1502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 742.1502 Policy. (a) USAID contracting... prescribed by the NIH Contractor Performance System. (Access to the system by USAID contracting office...
Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief
DOT National Transportation Integrated Search
2014-01-01
State transportation departments must rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in ensuring that State transportation dep...
Contractor Past Performance Information: An Analysis of Assessment Narratives and Objective Ratings
2015-04-30
narratives, and improving the disclosure of CPARS program office audit results (Black et al., 2014, pp. 48–49). Summary, Conclusions, and Recommendations...office audit results (Black et al., 2014, pp. 44–49). Recommendations Based on our conclusions, we identified the following five recommendations...and information technology (5th ed.). New York, NY: McGraw -Hill. Freeman, R. E. (1984). Strategic management: A stakeholder approach. Boston, MA
Defense Small Business Innovation Research Program (SBIR). Program Solicitation Number 89.1. FY-1989
1989-01-06
scale testing, such as plasma-arc and oxyacetylene torch test are performed. However, correlations to relate ablation rate from these test data to...helicopter rotor. In phase II, the contractor should construct and demonstrate a working model. 36 A89-010 TITLE: Smooth, Erosion Resistant Coatings ...for Organic Matrix Composites OBJECTIVE: Erosion Resistant Coatings for Organic Matrix Composites for use in Compressor Section of Future Gas Turbine
Development and validation of a strategic repositioning model for defense and aerospace contractors
NASA Astrophysics Data System (ADS)
Bers, John A.
Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.
2015-08-27
ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure
48 CFR 52.236-1 - Performance of Work by the Contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Performance of Work by the....236-1 Performance of Work by the Contractor. As prescribed in 36.501(b), insert the following clause... the work and customary or necessary specialty subcontracting (see 36.501(a)).] Performance of Work by...
48 CFR 970.5232-6 - Work for others funding authorization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... uncollectible receivables resulting from the Contractor utilizing contractor corporate funding for reimbursable... provide advance payment utilizing contractor corporate funds for reimbursable work to be performed by the... Laws, regulations, and DOE directives clause of this contract and such advance cannot be obtained. The...
2016-04-30
qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Big Data Analysis of Contractor Performance Information for Services...Director, Acquisition Career Management, ASN(RD&A) Big Data Analysis of Contractor Performance Information for Services Acquisition in DoD: A Proof of...oÉëÉ~êÅÜ=mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 398 - Big Data Analysis of Contractor Performance Information for Services Acquisition in
A strategic management model for evaluation of health, safety and environmental performance.
Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin
2012-05-01
Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.
48 CFR 215.404-71-3 - Contract type risk and working capital adjustment.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Description. The contract type risk factor focuses on the degree of cost risk accepted by the contractor under... extract from the DD 1547 is annotated to explain the process. Item Contractor risk factors Assigned value Base (item 20) Profit objective 24. CONTRACT type risk (1) (2) (3) Cost financed Length factor Interest...
32 CFR 199.15 - Quality and utilization review peer review organization program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Director, OCHAMPUS. These contractors may include contractors that have exclusive functions in the area of utilization and quality review, fiscal intermediary contractors (which perform these functions along with a... functions concerning management of the delivery and financing of health care services under CHAMPUS...
48 CFR 642.1503-70 - Contractor Performance System (CPS).
Code of Federal Regulations, 2011 CFR
2011-10-01
... Performance System (CPS) maintained by the National Institutes of Health. CPS is an Internet-based tool... with access to the Internet shall use CPS to evaluate contractor's past performance for all contracts... the CPS; or (2) At overseas locations where access to the Internet is not practicable. (d) Heads of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
...), excluding past performance reviews, shall be made publicly available. The interim rule notified contractors... not making ``past performance information'' available. Further, the respondent feared that it is only a matter of time before the Government also allows the public access to Government contractor ``past...
48 CFR 970.4402-3 - Purchasing from contractor-affiliated sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the entities are separately incorporated. (b) Subcontracts for performance of contract work itself (as distinguished from the purchase of supplies and services needed in connection with the performance of work... and operating contractor seeks authorization to have some part of the contract work performed by a...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 442.1502 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 442.1502 Policy. The Contractor Performance System (CPS), developed by the National Institutes of Health, is designated as the single USDA-wide system for maintaining...
78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... determinations in FAR subpart 9.1 and the impact of a contractor with more than one contract to have a negative... forecasting and cost controlling and the impact on future contracts. This respondent felt that a contractor... (including potential economic, environmental, public health and safety effects, distributive impacts, and...
Assessment and Develop the Saudi's Contractors Classification System
ERIC Educational Resources Information Center
Almutairi, Saud
2017-01-01
Research has shown that construction projects in Saudi Arabia have had a perceived poor performance for the past three decades, from 1970-2016. The Saudi construction industry relies on a Contractor Classification System (CCS) to determine contractors' capabilities, and prevent underperformance. Through this study, a survey was conducted among…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-22
... Activities; Proposed Collection; Comment Request; Background Checks for Contractor Employees (Renewal) AGENCY... the electronic docket, go to www.regulations.gov . Title: Background Checks for Contractor Employees... consolidated in 40 CFR part 9. Abstract: The EPA uses contractors to perform services throughout the nation...
48 CFR 52.215-23 - Limitations on Pass-Through Charges.
Code of Federal Regulations, 2010 CFR
2010-10-01
... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...
Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.
Bibliography of Supersonic Cruise Aircraft Research (SCAR) Program from 1972 to Mid-1977
NASA Technical Reports Server (NTRS)
Hoffman, S.
1977-01-01
This bibliography documents publications of the supersonic cruise aircraft research (SCAR) program that were generated during the first 5 years of effort. The reports are arranged according to systems studies and five SCAR disciplines: propulsion, stratospheric emissions impact, structures and materials, aerodynamic performance, and stability and control. The specific objectives of each discipline are summarized. Annotation is included for all NASA inhouse and low-number contractor reports. There are 444 papers and articles included.
NASA Technical Reports Server (NTRS)
1976-01-01
The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.
48 CFR 1552.216-77 - Award term incentive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performance measures for the corresponding evaluation period; or (iii) The Government notifies the contractor....216-77 Section 1552.216-77 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY...) based on overall contractor performance as evaluated in accordance with the Clause entitled “Award Term...
Study of aerodynamic technology for VSTOL fighter/attack aircraft, phase 1
NASA Technical Reports Server (NTRS)
Driggers, H. H.
1978-01-01
A conceptual design study was performed of a vertical attitude takeoff and landing (VATOL) fighter/attack aircraft. The configuration has a close-coupled canard-delta wing, side two-dimensional ramp inlets, and two augmented turbofan engines with thrust vectoring capability. Performance and sensitivities to objective requirements were calculated. Aerodynamic characteristics were estimated based on contractor and NASA wind tunnel data. Computer simulations of VATOL transitions were performed. Successful transitions can be made, even with series post-stall instabilities, if reaction controls are properly phased. Principal aerodynamic uncertainties identified were post-stall aerodynamics, transonic aerodynamics with thrust vectoring and inlet performance in VATOL transition. A wind tunnel research program was recommended to resolve the aerodynamic uncertainties.
23 CFR 646.105 - Contractor's public liability and property damage insurance.
Code of Federal Regulations, 2011 CFR
2011-04-01
... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...
23 CFR 646.105 - Contractor's public liability and property damage insurance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...
48 CFR 552.236-83 - Requirement for a Project Labor Agreement.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... “Project Labor Agreement” (PLA) means an agreement between the contractor, subcontractors, and the union(s) representing workers. Under a PLA, the contractor and subcontractors on a project and the union(s) agree on... Contractor shall, after contract award, enter into a PLA for performance of [Insert project or contract name...
48 CFR 52.249-8 - Default (Fixed-Price Supply and Service).
Code of Federal Regulations, 2010 CFR
2010-10-01
... beyond the control and without the fault or negligence of the Contractor. Examples of such causes include... beyond the control and without the fault or negligence of the Contractor. (d) If the failure to perform... the control of both the Contractor and subcontractor, and without the fault or negligence of either...
ERIC Educational Resources Information Center
Carpenter, Polly; And Others
The Texarkana model of performance contracting consists of five major elements: (1) turnkeying of cost-effective new technology as a basic program goal, (2) use of a performance contract for instruction, (3) use of a management support contractor, (4) selection of the learning system contractor by formal competition, and (5) use of independent…
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1501 General. Past... commitment to customer satisfaction; the contractor's reporting into databases (see subparts 4.14 and 4.15...
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1501 General. Past... commitment to customer satisfaction; the contractor's reporting into databases (see subparts 4.14 and 4.15...
48 CFR 1019.202-70-5 - Incentives for prime contractor participation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), Treasury.../management factors. (b) A mentor's performance will be evaluated against the criteria described in DTAR 1052... contracts as a factor in determining contractor responsibility under FAR 19.705-5(a)(1). (d) Mentor-protégé...
48 CFR 217.7404-6 - Allowable profit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ensure the profit allowed reflects— (a) Any reduced cost risk to the contractor for costs incurred during contract performance before negotiation of the final price; (b) The contractor's reduced cost risk for costs incurred during performance of the remainder of the contract; and (c) The requirements at 215.404...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 1252.216-71 - Determination of award fee.
Code of Federal Regulations, 2014 CFR
2014-10-01
... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...
48 CFR 1252.216-71 - Determination of award fee.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...
48 CFR 1252.216-71 - Determination of award fee.
Code of Federal Regulations, 2013 CFR
2013-10-01
... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...
48 CFR 1252.216-71 - Determination of award fee.
Code of Federal Regulations, 2012 CFR
2012-10-01
... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...
48 CFR 1252.216-71 - Determination of award fee.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contractor shall be periodically informed of the quality of its performance and areas in which improvements... reasons why the award fee was or was not earned. The contractor may submit a performance self-evaluation... self-evaluation received within ___ (insert number) days after the end of the current evaluation period...
40 CFR 160.10 - Applicability to studies performed under grants and contracts.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS General Provisions § 160.10... services of a consulting laboratory, contractor, or grantee to perform all or a part of a study to which this part applies, it shall notify the consulting laboratory, contractor, or grantee that the service...
40 CFR 792.10 - Applicability to studies performed under grants and contracts.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS General... person utilizes the services of a consulting laboratory, contractor, or grantee to perform all or a part of a study to which this part applies, it shall notify the consulting laboratory, contractor, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... performing his or her job. 1. A contractor is required to make reasonable accommodations to the known... qualified with respect to that process. One is “otherwise qualified” if he or she is qualified for a job... the job's essential functions. 2. Although the contractor would not be expected to accommodate...
MV-22 Squadron Organization: A Different Way to Support
2017-06-09
acquisitions process, contractors have become an integral part in the support of daily MV-22...perform. MCAS New River has several teams of contract maintainers that are sent to individual squadrons on a daily basis.6 As the need for contractors ...has increased, more jobs have become available to qualified maintainers. This actually increases the need for even more contractors , as qualified
Defense AT and L Magazine. Vol. 45, no. 5, September-October 2016
2016-09-01
standard federal assistance awards. These contractors might be small, startup technology firms supported by venture capital, leading-edge technology...to provide effective contract oversight and present an accurate picture of contractor performance to the procuring contracting office. Lesson...mission footprints encompass a great deal of contractor activity, leadership that is not regularly engaged with the acquisition team often gives
48 CFR 8.405-5 - Small business.
Code of Federal Regulations, 2011 CFR
2011-10-01
... a size standard that corresponds to the work performed. Ordering activities should rely on the small... business, women-owned small business, or small disadvantaged business schedule contractor(s). GSA Advantage...
48 CFR 245.603-70 - Contractor performance of plant clearance duties.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Government-furnished property from inventory schedules; (v) Evaluate physical, quantitative, and technical allocability of contractor inventory prior to disposal using Standard Form 1423, Inventory Verification Survey...
Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billingsley, Megan; Stuart, Elizabeth
2011-08-17
Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.
Highlights of contractor initiatives in quality enhancement and productivity improvement
NASA Technical Reports Server (NTRS)
1986-01-01
The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.
... prohibits discrimination on the basis of age by contractors and subcontractors in the perform- ance of Federal ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...
Code of Federal Regulations, 2010 CFR
2010-01-01
... decline to approve performance of a particular task by the contractor if an actual or potential OCI is...) Terminate the contract, or, in the case of a task order contract, terminate the particular task; (ii) Insist... contractor to continue to perform the contract (or task) under the waiver provisions of § 1706.8, and, where...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-06
... Drug and Alcohol Management Information System (DAMIS) to operators, but will make the user name and... DAMIS Sign-In Information AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... testing information must be submitted for contractors performing or ready to perform covered functions...
29 CFR 4.146 - Contract obligations after award, generally.
Code of Federal Regulations, 2010 CFR
2010-07-01
... time spent by employees undertaking such training or phase-in work is considered to be hours worked on... thereunder only while the employees are performing on the contract, provided the contractor's records make clear the period of such performance. (See also § 4.179.) If employees of the contractor are required by...
34 CFR 674.48 - Use of contractors to perform billing and collection or other program activities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false Use of contractors to perform billing and collection or other program activities. 674.48 Section 674.48 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL PERKINS...
34 CFR 674.48 - Use of contractors to perform billing and collection or other program activities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false Use of contractors to perform billing and collection or other program activities. 674.48 Section 674.48 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL PERKINS...
48 CFR 1852.219-84 - Limitation of the principal investigator-STTR program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SBC/Contractor or RI. (b) The PI is considered to be key personnel in the performance of this contract. The SBC/Contractor, whether or not the employer of the PI, shall exercise primary management direction and control over the PI and be overall responsible for the PI's performance under this contract...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... Competition Throughout the Life Cycle of Major Defense Acquisition Programs AGENCY: Defense Acquisition... subcontract level of the MDAP throughout its life cycle as a means to improve contractor performance; and (2...) throughout the program life cycle as a means to improve contractor performance; and (ii) Document the...
48 CFR 52.209-9 - Updates of Publicly Available Information Regarding Responsibility Matters.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi... Contractor Registration database at http://www.ccr.gov. (b)(1) The Contractor will receive notification when..., except past performance reviews, will be publicly available. (End of clause) Alternate I ( JAN 2011). As...
13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...
Self-amplified optical pattern recognition system
NASA Technical Reports Server (NTRS)
Liu, Hua-Kuang (Inventor)
1994-01-01
A self amplifying optical pattern recognizer includes a geometric system configuration similar to that of a Vander Lugt holographic matched filter configuration with a photorefractive crystal specifically oriented with respect to the input beams. An extraordinarily polarized, spherically converging object image beam is formed by laser illumination of an input object image and applied through a photorefractive crystal, such as a barium titanite (BaTiO.sub.3) crystal. A volume or thin-film dif ORIGIN OF THE INVENTION The invention described herein was made in the performance of work under a NASA contract, and is subject to the provisions of Public Law 96-517 (35 USC 202) in which the Contractor has elected to retain title.
48 CFR 1852.212-70 - Notice of delay.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...
48 CFR 1852.212-70 - Notice of delay.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...
48 CFR 1852.212-70 - Notice of delay.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...
48 CFR 1852.212-70 - Notice of delay.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...
48 CFR 1852.212-70 - Notice of delay.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...
Delicious Heart-Healthy Latino Recipes
... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...
2000-08-18
heavy reliance on contractors to perform much of the work performed by civilian employees . While this trend is expected to continue, a critical mass...manage, and, if necessary, terminate non- performing employees . Accountability measures should be clear and have consequences. ◆ Investments in human...complexity of work increas- es and the performance of industrial-type functions is shifted to contractors. The impact of this shift on the occupational
Navy Financial Reporting of Government-Owned Materials Held by Commercial Shipyard Contractors
2001-03-02
NAVY FINANCIAL REPORTING OF GOVERNMENT-OWNED MATERIALS HELD BY COMMERCIAL SHIPYARD CONTRACTORS Report No. D-2001-071...A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Navy Financial Reporting of Government-Owned Materials Held by Commercial Shipyard... Financial Reporting of Government-Owned Materials Held by Commercial Shipyard Contractors Executive Summary Introduction. We performed this audit in
Implementation of a Mentor-Protege Program by a Major Department of Defense Contractor
1991-06-01
Department of Defense contractors to furnish disadvantaged small business concerns with assistance designed to enhance their capabilities to perform...implementation by analyzing the perceptions of one large DoD contractor and the small disadvantaged business community regarding the Mentor-Protege program...offered by this program would be effective in improving the capabilities of small disadvantaged businesses. There are, however, several barriers present
2016-12-01
SMD-VAC- GP, Virtual Industries) with plastic tip. Then the chip was covered with silicone open-cell foam (0.062” thick, HT -870, Stockwell...the build. 26 We discussed with a sub- contractor in Livermore who might be able to perform the packaging assembly work. Dr. Kotovsky...worked with the sub- contractor on practice assemblies anticipating the new upcoming build. Working through an outside contractor represents an enormous
Quality based prequalification of contractors
DOT National Transportation Integrated Search
2001-08-01
This report summarizes the efforts to provide the Kentucky Transportation Cabinet with a system for evaluating the quality of the performance of contractors on highway construction projects and using that evaluation in the Cabinet's annual prequalifi...
48 CFR 509.405-1 - Continuation of current contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to the debarment or suspension also constitute a default in the contractor's performance of the contract. (2) The contractor presents a significant risk to the Government in completing the contract. (3...
Asthma & Physical Activity in the School
... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...
Families Finding the Balance: A Parent Handbook
... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor my discriminate against any employee or applicant for ...
Space station automation and robotics study. Operator-systems interface
NASA Technical Reports Server (NTRS)
1984-01-01
This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.
NASA Astrophysics Data System (ADS)
McCrea, Terry
The Shuttle Processing Contract (SPC) workforce consists of Lockheed Space Operations Co. as prime contractor, with Grumman, Thiokol Corporation, and Johnson Controls World Services as subcontractors. During the design phase, reliability engineering is instrumental in influencing the development of systems that meet the Shuttle fail-safe program requirements. Reliability engineers accomplish this objective by performing FMEA (failure modes and effects analysis) to identify potential single failure points. When technology, time, or resources do not permit a redesign to eliminate a single failure point, the single failure point information is formatted into a change request and presented to senior management of SPC and NASA for risk acceptance. In parallel with the FMEA, safety engineering conducts a hazard analysis to assure that potential hazards to personnel are assessed. The combined effort (FMEA and hazard analysis) is published as a system assurance analysis. Special ground rules and techniques are developed to perform and present the analysis. The reliability program at KSC is vigorously pursued, and has been extremely successful. The ground support equipment and facilities used to launch and land the Space Shuttle maintain an excellent reliability record.
48 CFR 252.209-7007 - Prohibited Financial Interests for Lead System Integrators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor for the development or production of a major system, if the prime contractor is not expected at the time of award to perform a substantial portion of the work on the system and the major subsystems... for the procurement of services, the primary purpose of which is to perform acquisition functions...
NASA Technical Reports Server (NTRS)
Strand, Albert A.; Jackson, Darryl J.
1992-01-01
As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.
NASA Astrophysics Data System (ADS)
Strand, Albert A.; Jackson, Darryl J.
As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.
48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).
Code of Federal Regulations, 2011 CFR
2011-10-01
... Technology Reporting Web site http://invention.nasa.gov. (End of addition) (f)(5) The Contractor shall... of tier, for experimental, developmental, research, design, or engineering work to be performed by...
Self Insuring against Asbestos Removal Risks.
ERIC Educational Resources Information Center
Slutzky, Lorence H.
1987-01-01
Asbestos removal is costly and many contractors have difficulty in obtaining insurance coverage. Presents a case for self insuring if contractors perform the removal work in compliance with state and federal regulations. Includes a reference list. (MD)
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
7 CFR 1788.47 - Policy requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Telecommunications Borrowers § 1788.47 Policy requirements. (a) Contractors, engineers, and architects performing work for borrowers under construction...
48 CFR 2052.209-72 - Contractor organizational conflicts of interest.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Does not obtain an unfair competitive advantage over other parties by virtue of its performance of this... technical bias or unfair competitive advantage. (d) Disclosure after award. (1) The contractor warrants that...
Construction and material specification
DOT National Transportation Integrated Search
2002-01-01
These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...
Weapon Acquisition Program Outcomes and Efforts to Reform DOD’s Acquisition Process
2016-05-09
portfolio’s total estimated acquisition cost. 11. The equity prices of contractors delivering the ten costliest programs performed well relative to broad...cost growth. • In a constrained funding environment, unforeseen cost increases limit investment choices. The equity prices of the contractors ...remain profitable well into the future • Five publicly-traded defense contractors are developing and delivering the ten largest DOD programs in the 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Training programs at DOE facilities should prepare personnel to safely and efficiently operate and maintain the facilities in accordance with DOE requirements. This guide presents good practices for a systematic approach to on-the-job training (OJT) and OJT programs and should be used in conjunction with DOE Training Program Handbook: A Systematic Approach to Training, and with the DOE Handbook entitled Alternative Systematic Approaches to Training to develop performance-based OJT programs. DOE contractors may also use this guide to modify existing OJT programs that do not meet the systematic approach to training (SAT) objectives.
48 CFR 852.236-72 - Performance of work by the contractor.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...
48 CFR 852.236-72 - Performance of work by the contractor.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...
48 CFR 852.236-72 - Performance of work by the contractor.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...
48 CFR 852.236-72 - Performance of work by the contractor.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... System (NAS), substitute the following paragraphs (b) and (c) for paragraphs (b) and (c) of the basic...
48 CFR 1552.235-80 - Access to confidential business information.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) during the performance of tasks required under this contract. However, the following applies to any and all tasks under which the contractor will or may have access to CBI: The contractor shall not have...
1985-04-12
12 9 5 VPV TiTAY T,%. T , TiRAiU A ~ 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(.) 6. CONTRACT OR GRANT NUMBER(a) .-- CPT zi 0 9. PERFORMING ...of period covered, such as the life of a contract covered in a final contractor report. Block 6. Performing Organization Report Number. Only numbers...affiliation of an author if it differs from that of the performing organization. Block 8. Contract or grant Number(s). For a contractor or grantee
Contractors on Deployed Military Operations: United Kingdom Policy and Doctrine
2005-09-01
contractor’s workforce than military personnel, and contractors cannot be disciplined for violations of the Uniform Code of Military Justice.101 Moreover...objectives are met.151 The MoD’s “Defence Agencies” currently employ 60 percent of MoD’s civilian workforce and 11 percent of total uniformed personnel...operations by staff drawn from the contractor’s workforce who are reservist members of the Armed Forces.”177 With these initiatives, MoD assumes it has
1994-01-07
during the course of the work. A contractor could also be subject to federal or state orders compelling the cleanup of property , -3- including...government property , contaminated during the course of work. A contractor could also be held liable for the costs of remediating sites to which hazardous...parties under a variety of traditional tort theories, including strict liability, trespass, nuisance, and negligence, for personal injury or property
2016-10-14
not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.502 Applicability. (a) This... limited to any particular kind of acquisition. However, organizational conflicts of interest are more... professional services; (3) Contractor performance of or assistance in technical evaluations; or (4) Systems...
48 CFR 245.105 - Contractor's property management system compliance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractor's property management system compliance. The assigned property administrator shall perform...
48 CFR 22.406-4 - Apprentices and trainees.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contractor's employment and payment records of apprentices and trainees made available pursuant to the clause... reject the classification and require the contractor to pay the affected employees at the rates applicable to the classification of the work actually performed. ...
48 CFR 22.406-4 - Apprentices and trainees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor's employment and payment records of apprentices and trainees made available pursuant to the clause... reject the classification and require the contractor to pay the affected employees at the rates applicable to the classification of the work actually performed. ...
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506 Procedures. If the CO determines that contractor performance of the contemplated work is likely to create an organizational conflict of interest, then the contracting officer shall refer the documentation of the potential...
48 CFR 52.232-32 - Performance-Based Payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... is endangered by the Contractor's (i) failure to make progress, or (ii) unsatisfactory financial... title; (iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges... Government access. The Contractor shall promptly furnish reports, certificates, financial statements, and...
23 CFR 635.116 - Subcontracting and contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...
48 CFR 45.000 - Scope of part.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Government has acquired a lien or title solely because of partial, advance, progress, or performance-based... Section 45.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... Government property to contractors, contractors' management and use of Government property, and reporting...
NASA Astrophysics Data System (ADS)
Marhani, M. A.; Muksain, M. A. S.
2018-02-01
Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.
Aesthetic coatings for concrete bridge components
NASA Astrophysics Data System (ADS)
Kriha, Brent R.
This thesis evaluated the durability and aesthetic performance of coating systems for utilization in concrete bridge applications. The principle objectives of this thesis were: 1) Identify aesthetic coating systems appropriate for concrete bridge applications; 2) Evaluate the performance of the selected systems through a laboratory testing regimen; 3) Develop guidelines for coating selection, surface preparation, and application. A series of site visits to various bridges throughout the State of Wisconsin provided insight into the performance of common coating systems and allowed problematic structural details to be identified. To aid in the selection of appropriate coating systems, questionnaires were distributed to coating manufacturers, bridge contractors, and various DOT offices to identify high performing coating systems and best practices for surface preparation and application. These efforts supplemented a literature review investigating recent publications related to formulation, selection, surface preparation, application, and performance evaluation of coating materials.
2016-10-01
needs, the MOPW is beginning to use local Afghan contractors to perform road work, because they have fewer problems with insurgents than...international contractors . They noted that Afghanistan’s road infrastructure plays an important role in the country’s development and governance, and if the...road maintenance program. As part of the program, the MOPW was to transfer staff to the road maintenance unit, while USAID’s contractor was to
NASA Astrophysics Data System (ADS)
Szajnfarber, Zoe; Stringfellow, Margaret V.; Weigel, Annalisa L.
2010-11-01
This paper captures a first detailed attempt to quantitatively analyze the innovation history of the space sector. Building on a communication satellite innovation metric and a spacecraft innovation framework developed as part of an ongoing project, this paper presents a preliminary model of global communication satellite innovation. In addition to innovation being a function of the rate of performance normalized by price, innovation was found to be strongly influenced by characteristics of the customer-contractor contractual relationship. Specifically, Department of Defense contracts tend to result in a lower level of innovation on average as compared to other customers. Also, particular customer-contractor pairs perform differently and exhibit a second order relationship in time.
Stirling convertor performance mapping test results
NASA Astrophysics Data System (ADS)
Qiu, Songgang; Peterson, Allen A.; White, Maurice A.; Faultersack, Franklyn; Redinger, Darin L.; Petersen, Stephen L.
2002-01-01
The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. Recent TDC performance data are provided in this paper, together with predictions from Stirling simulation models. .
Waste isolation safety assessment program. Task 4. Third contractor information meeting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-06-01
The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less
42 CFR 421.316 - Limitation on Medicare integrity program contractor liability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... services to a MIP contractor is not in violation of any criminal law or civilly liable under any law of the United States or of any State (or political subdivision thereof) by reason of the performance of any duty...
48 CFR 1344.302 - Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews § 1344.302 Requirements. The designee authorized to lower or raise the $25 million sales threshold for performing a review to determine if a contractor purchasing system review is needed is set forth in CAM 1301.70. ...
Galileo: Exploration of Jupiter's system
NASA Technical Reports Server (NTRS)
Johnson, T. V.; Yeates, C. M.; Colin, L.; Fanale, F. P.; Frank, L.; Hunten, D. M.
1985-01-01
The scientific objectives of the Galileo mission to the Jovian system is presented. Topics discussed include the history of the project, our current knowledge of the system, the objectives of interrelated experiments, mission design, spacecraft, and instruments. The management, scientists, and major contractors for the project are also given.
Effect of Liquid Penetrant Sensitivity on Probability of Detection
NASA Technical Reports Server (NTRS)
Parker, Bradford H.
2011-01-01
The objective of the task is to investigate the effect of liquid penetrant sensitivity level on probability of detection (POD) of cracks in various metals. NASA-STD-5009 currently requires the use of only sensitivity level 4 liquid penetrants for NASA Standard Level inspections. This requirement is based on the fact that the data used to establish the reliably detectable flaw sizes penetrant inspection was from studies performed in the 1970s using penetrant deemed to be equivalent only to modern day sensitivity level 4 penetrants. However, many NDE contractors supporting NASA Centers routinely use sensitivity level 3 penetrants. Because of the new NASA-STD-5009 requirement, these contractors will have to either shift to sensitivity level 4 penetrants or perform formal POD demonstration tests to qualify their existing process. We propose a study to compare the POD generated for two penetrant manufactures, Sherwin and Magnaflux, and for the two most common penetrant inspection methods, water washable and post emulsifiable, hydrophilic. NDE vendors local to GSFC will be employed. A total of six inspectors will inspect a set of crack panels with a broad range of fatigue crack sizes. Each inspector will perform eight inspections of the panel set using the combination of methods and sensitivity levels described above. At least one inspector will also perform multiple inspections using a fixed technique to investigate repeatability. The hit/miss data sets will be evaluated using both the NASA generated DOEPOD software and the MIL-STD-1823 software.
Directory of Federal Contractors and Cognizant Audit Offices
1994-12-31
34 qLELECTE 11. Title: , Directory of Federal Contractors and Cognizant Audit Offices 12. Performing Organization: 13 . Performing Report #: 14...GRAND AVE EL SEGUNDO CA 90245 3106150311 COMPUTER SCIENCE CORPORATION 04311 044 BUILDING T-164 FT. HUNTER LIGGE CA 93928 4083882775 COMPUTER SCIENCE...INC 03621 110 2650 INDUSTRIAL PKW MARINETTE WI 54143 7157359058 FIRE SYS INC 01271 084 5110 S. MACDILL AVE TAMPA FL 33611 6138379491 FIRE-BANN
75 FR 28777 - Information Collection; Financial Information Security Request Form
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
...;and investigations, committee meetings, agency decisions and rulings, #0;delegations of authority... at the National Finance Center (NFC). The Forest Service uses employees and contractors to maintain these financial records. The employees and contractors must have access to NFC to perform their duties...
77 FR 54864 - Federal Acquisition Regulation; Documenting Contractor Performance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-06
....g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report... applicable) (e.g.; late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to... that allowing contractors to ``report to the CPARS system'' would have a negative impact on future...
75 FR 81209 - Information Collection; National Incident Support Stakeholder Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... define best practices. Stakeholders include Forest Service employees, other Federal agencies, industry... goal of determining the acquisition method which is in the best interest of the Federal government, imposes a reasonable risk on the contractor, yet also motivates effective contractor performance. The...
48 CFR 9904.401-60 - Illustrations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...
48 CFR 9904.401-60 - Illustrations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...
48 CFR 9904.401-60 - Illustrations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...
23 CFR 660.519 - Missile installations and facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... facilities. Should damage occur to public highways as a result of construction activities, the contractor... the work performed. Claims shall be presented to the contractor for this extraordinary maintenance and... the contract terms, the claim with the required supporting documentation shall be presented to the...
23 CFR 660.519 - Missile installations and facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... facilities. Should damage occur to public highways as a result of construction activities, the contractor... the work performed. Claims shall be presented to the contractor for this extraordinary maintenance and... the contract terms, the claim with the required supporting documentation shall be presented to the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Reports. 9.106-4 Section 9... CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106-4 Reports. (a) The surveying activity... performance. The narrative shall report any persistent pattern of need for costly and burdensome Government...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Reports. 9.106-4 Section 9... CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106-4 Reports. (a) The surveying activity... performance. The narrative shall report any persistent pattern of need for costly and burdensome Government...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Reports. 9.106-4 Section 9... CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106-4 Reports. (a) The surveying activity... performance. The narrative shall report any persistent pattern of need for costly and burdensome Government...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Reports. 9.106-4 Section 9... CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106-4 Reports. (a) The surveying activity... performance. The narrative shall report any persistent pattern of need for costly and burdensome Government...
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
NASA Technical Reports Server (NTRS)
Hirshorn, Steven R.
2017-01-01
Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.
NASA Technical Reports Server (NTRS)
Seiner, John M.; Ponton, Michael K.; Manning, James C.
1992-01-01
The following provides a summary for research being conducted by NASA/LaRC and its contractors and grantees to develop jet engine noise suppression technology under the NASA High Speed Research (HSR) program for the High Speed Civil Transport (HSCT). The objective of this effort is to explore new innovative concepts for reducing noise to Federally mandated guidelines with minimum compromise on engine performance both in take-off and cruise. The research program is divided into four major technical areas: (1) jet noise research on advanced nozzles; (2) plume prediction and validation; (3) passive and active control; and (4) methodology for noise prediction.
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 452.237-75 - Restrictions Against Disclosure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 452.237-75...: Restrictions Against Disclosure (FEB 1988) (a) The Contractor agrees, in the performance of this contract, to... to know” basis. The Contractor agrees to immediately notify in writing, the Contracting Officer...
37 CFR 401.14 - Standard patent rights clauses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... clauses. 401.14 Section 401.14 Patents, Trademarks, and Copyrights ASSISTANT SECRETARY FOR TECHNOLOGY... performance. (3) Practical Application means to manufacture in the case of a composition or product, to... Disclosure, Election of Title and Filing of Patent Application by Contractor (1) The contractor will disclose...
37 CFR 401.14 - Standard patent rights clauses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... clauses. 401.14 Section 401.14 Patents, Trademarks, and Copyrights ASSISTANT SECRETARY FOR TECHNOLOGY... performance. (3) Practical Application means to manufacture in the case of a composition or product, to... Disclosure, Election of Title and Filing of Patent Application by Contractor (1) The contractor will disclose...
48 CFR 352.242-72 - Native American Graves Protection and Repatriation Act.
Code of Federal Regulations, 2011 CFR
2011-10-01
... individuals and organizations when they discover Native American cultural items (including human remains) on Federal or Tribal lands. (b) In the event the Contractor discovers Native American cultural items... cultural patrimony), as defined in the Act during contract performance, the Contractor shall— (i...
48 CFR 352.242-72 - Native American Graves Protection and Repatriation Act.
Code of Federal Regulations, 2010 CFR
2010-10-01
... individuals and organizations when they discover Native American cultural items (including human remains) on Federal or Tribal lands. (b) In the event the Contractor discovers Native American cultural items... cultural patrimony), as defined in the Act during contract performance, the Contractor shall— (i...
Central Contractor Registration Handbook (CCR)
2002-03-01
Assistance Center 888-227-2423 or 616-961-4725 Report Documentation Page Report Date 00/03/2002 Report Type N/A Dates Covered (from... to) - Title and......Work Unit Number Performing Organization Name(s) and Address(es) Central Contractor Registration Assistance Center (888-227-2423) or (616-961-4725
29 CFR 471.1 - What definitions apply to this part?
Code of Federal Regulations, 2010 CFR
2010-07-01
... NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Definitions, Requirements for Employee Notice, and... location or facility at which a contractor or subcontractor meets a demand or performs a function relating...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
Improving the Agency's Software Acquisition Capability
NASA Technical Reports Server (NTRS)
Hankinson, Allen
2003-01-01
External development of software has oftc n led to unsatisfactory results and great frustration for the assurE 7ce community. Contracts frequently omit critical assuranc 4 processes or the right to oversee software development activitie: At a time when NASA depends more and more on software to in plement critical system functions, combination of three factors ex; cerbate this problem: I ) the ever-increasing trend to acquire rather than develop software in-house, 2) the trend toward performance based contracts, and 3) acquisition vehicles that only state softwar 2 requirements while leaving development standards and assur! ince methodologies up to the contractor. We propose to identify specific methods at d tools that NASA projects can use to mitigate the adverse el ects of the three problems. TWO broad classes of methoddt ols will be explored. The first will be those that provide NASA p ojects with insight and oversight into contractors' activities. The st cond will be those that help projects objectively assess, and thus i nprwe, their software acquisition capability. Of particular interest is the Software Engineering Institute's (SEI) Software Acqt isition Capability Maturity Model (SA-CMMO).
48 CFR 35.005 - Work statement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...
48 CFR 35.005 - Work statement.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...
48 CFR 35.005 - Work statement.
Code of Federal Regulations, 2014 CFR
2014-10-01
... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...
48 CFR 35.005 - Work statement.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...
Battelle Energy Alliance, LLC (BEA) 2016 Self-Assessment Report for Idaho National Laboratory (INL)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alvarez, Juan
This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2015, through September 30, 2016, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2016 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). The overall performance of BEA during this rating period was self-assessed as “Excellent,”more » exceeding expectations of performance in Goal 1.0, “Efficient and Effective Mission Accomplishment”; Goal 2.0, “Efficient and Effective Stewardship and Operation of Research Facilities”; and Goal 3.0, “Sound and Competent Leadership and Stewardship of the Laboratory.” BEA met or exceeded expectations for Mission Support Goals 4.0 through 7.0 assessing a final multiplier of 1.0. Table 1 documents BEA’s assessment of performance to the goals and individual performance objectives. Table 2 documents completion of the notable outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2015 Self-Assessment Report.« less
Monitoring of the Quality of the Defense Contract Audit Agency FY 2010 Audits
2013-03-07
performed by regional audit managers include reviewing high risk assignments and reports prior to their issuance, performing post-issuance reviews, or...brainstorming procedure requires the audit team ( managers , supervisors, and auditors) to discuss the risk of fraud for that engagement and to discuss the risk ...auditors to make inquiries of contractor management of management’s knowledge of fraud risks during its annual planning meeting with major contractors
Pooling knowledge and improving safety for contracted works at a large industrial park.
Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo
2015-01-01
At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.
Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed
NASA Technical Reports Server (NTRS)
Dunn, Steven C.; Schlank, John J.
2010-01-01
In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.
Code of Federal Regulations, 2010 CFR
2010-10-01
... shall determine the need for a CPSR based on, but not limited to, the past performance of the contractor, and the volume, complexity and dollar value of subcontracts. If a contractor's sales to the Government... adjustment contracts and sales of commercial items pursuant to Part 12) are expected to exceed $25 million...
Code of Federal Regulations, 2011 CFR
2011-10-01
... shall determine the need for a CPSR based on, but not limited to, the past performance of the contractor, and the volume, complexity and dollar value of subcontracts. If a contractor's sales to the Government... adjustment contracts and sales of commercial items pursuant to Part 12) are expected to exceed $25 million...
48 CFR 904.7004 - Findings, determination, and contract award or termination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... that award of a contract to an offeror(s) or continued performance of a contract by a contractor will... types of plans that a contractor can propose are: measures which provide for physical or organizational separation of the facility or organizational component containing the classified information or special...
48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).
Code of Federal Regulations, 2010 CFR
2010-10-01
... of tier, for experimental, developmental, research, design, or engineering work to be performed by... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Patent Rights-Retention by the Contractor (Short Form). 1852.227-11 Section 1852.227-11 Federal Acquisition Regulations System...
29 CFR 4.179 - Identification of contract work.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Identification of contract work. 4.179 Section 4.179 Labor... Compliance with Compensation Standards § 4.179 Identification of contract work. Contractors and... workweek are engaged in performing work on such contracts. If such a contractor during any workweek is not...
48 CFR 52.245-1 - Government Property.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performing a contract, and to which the Government has title. Contractor inventory means— (1) Any property acquired by and in the possession of a Contractor or subcontractor under a contract for which title is... unusable for, and not restorable to, the purpose for which it was designed or is customarily used...
48 CFR 742.1170-4 - Progress reporting requirements and contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...
Contractor Incentives for Success in Implementing Performance-Based Logistics: A Progress Report
2010-04-30
amount of risk; this, however, gives the contractor more latitude in determining and applying its methods ( KMC /OPI, 2010). The general consensus...Klevan, P. (2008, October 27). Navy success with PBL. Presentation at the DoD Maintenance Symposium. KMC /OPI. (2010, January 19). Acquisition
23 CFR 635.110 - Licensing and qualification of contractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
... of Personal Conflicts of Interest for Contractor Employees (FAR PCI COMMENT) AGENCY: Department of... the question of whether additional guidance is necessary to address personal conflicts of interest by... to address personal conflicts of interest by contractor employees performing acquisition functions...
48 CFR 27.404-6 - Inspection of data at the contractor's facility.
Code of Federal Regulations, 2010 CFR
2010-10-01
... regarding the limited rights or restricted rights status of the data, or for evaluating work performance... REGULATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.404-6 Inspection of data at the contractor's facility. Contracting officers may obtain the right to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
RASMUSSEN, J.H.
1999-08-02
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102 required to satisfy the Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank TIS An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase 1: Confirm Tank TIS An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste andmore » High Level Waste Feed Data Quality Objectives (L&H DQO) (Patello et al. 1999) and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues, except the Equipment DQO apply to tank 241-AZ-102 for this sampling event. The Equipment DQO is applied for shear strength measurements of the solids segments only. Poppiti (1999) requires additional americium-241 analyses of the sludge segments. Brown et al. (1998) also identify safety screening, regulatory issues and provision of samples to the Privatization Contractor(s) as applicable issues for this tank. However, these issues will not be addressed via this sampling event. Reynolds et al. (1999) concluded that information from previous sampling events was sufficient to satisfy the safety screening requirements for tank 241 -AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses, and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AZ-102 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plan.« less
Recovery of Indirect Costs in the Pricing of Equitable Adjustments and Terminations for Convenience
1988-05-01
per unit of production decreases.2 0 5 For example, a contractor buys a machine for $10,000 that will be obsolete after one year. If the contractor...convenience may reduce the quantity of material needed for performance and the volume of purchases made by the contractor. As a result of not buying in...Ocean Technology, ASBCA 21363, 78-1 BCA 13204 at 64,586; Franchi Constr., ASBCA 16735, 74-2 BCA 10654 at 50,598; Warren Painting, ASBCA 18456, 74-2
Results of a community-based survey of construction safety climate for Hispanic workers
Marin, Luz S; Cifuentes, Manuel; Roelofs, Cora
2015-01-01
Background: Hispanic construction workers experience high rates of occupational injury, likely influenced by individual, organizational, and social factors. Objectives: To characterize the safety climate of Hispanic construction workers using worker, contractor, and supervisor perceptions of the workplace. Methods: We developed a 40-item interviewer-assisted survey with six safety climate dimensions and administered it in Spanish and English to construction workers, contractors, and supervisors. A safety climate model, comparing responses and assessing contributing factors was created based on survey responses. Results: While contractors and construction supervisors’ (n = 128) scores were higher, all respondents shared a negative perception of safety climate. Construction workers had statistically significantly lower safety climate scores compared to supervisors and contractors (30.6 vs 46.5%, P<0.05). Safety climate scores were not associated with English language ability or years lived in the United States. Conclusions: We found that Hispanic construction workers in this study experienced a poor safety climate. The Hispanic construction safety climate model we propose can serve as a framework to guide organizational safety interventions and evaluate safety climate improvements. PMID:26145454
10 CFR 1047.4 - Arrest authority.
Code of Federal Regulations, 2010 CFR
2010-01-01
... section is a felony if the offense which is the object of the conspiracy is a felony). (G) Destruction of... U.S.C. 371—(violation of section is a misdemeanor if the offense which is the object of the... Chief Counsel, in coordination with contractor legal counsel, as appropriate, shall provide guidance in...
Safety Issues at the Defense Production Reactors. A Report to the U.S. Department of Energy.
ERIC Educational Resources Information Center
National Academy of Sciences - National Research Council, Washington, DC. Commission on Physical Sciences, Mathematics, and Resources.
This report provides an assessment of safety management, safety review, and safety methodology employed by the Department of Energy (DOE) and private contractors. Chapter 1, "The DOE Safety Framework," examines safety objectives for production reactors and processes to implement the objectives. Chapter 2, "Technical Issues,"…
23 CFR 635.413 - Guaranty and warranty clauses.
Code of Federal Regulations, 2014 CFR
2014-04-01
... CONSTRUCTION AND MAINTENANCE General Material Requirements § 635.413 Guaranty and warranty clauses. The STD may... obligation on the contractor for items over which the contractor has no control. (d) A STD may follow its own...) Performance warranties for specific products on NHS projects may be used at the STD's discretion. If...
23 CFR 635.413 - Guaranty and warranty clauses.
Code of Federal Regulations, 2012 CFR
2012-04-01
... CONSTRUCTION AND MAINTENANCE General Material Requirements § 635.413 Guaranty and warranty clauses. The STD may... obligation on the contractor for items over which the contractor has no control. (d) A STD may follow its own...) Performance warranties for specific products on NHS projects may be used at the STD's discretion. If...
23 CFR 635.413 - Guaranty and warranty clauses.
Code of Federal Regulations, 2011 CFR
2011-04-01
... CONSTRUCTION AND MAINTENANCE General Material Requirements § 635.413 Guaranty and warranty clauses. The STD may... obligation on the contractor for items over which the contractor has no control. (d) A STD may follow its own...) Performance warranties for specific products on NHS projects may be used at the STD's discretion. If...
23 CFR 635.413 - Guaranty and warranty clauses.
Code of Federal Regulations, 2013 CFR
2013-04-01
... CONSTRUCTION AND MAINTENANCE General Material Requirements § 635.413 Guaranty and warranty clauses. The STD may... obligation on the contractor for items over which the contractor has no control. (d) A STD may follow its own...) Performance warranties for specific products on NHS projects may be used at the STD's discretion. If...
Top DoD Management Challenges, Fiscal Year 2018
2018-01-01
Afghan Human Resource Information Management System to validate ANDSF personnel numbers and salaries; • Afghan Personnel Pay System to facilitate...unit strength accountability and personnel verification; and • Core Information Management System to improve accountability of equipment inventories...ACQUISITION AND CONTRACT MANAGEMENT Federal Acquisition Regulation requires contractor performance information be collected in the Contractor
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-21
... those existing FAR policies so that DHS contractors will identify their method of accounting for labor...' methods of accounting for uncompensated overtime performed by employees who are exempt from the Fair Labor... of accounting for labor hours incurred and agree to a price adjustment if their billing practices...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS... Directive 3002.01E, Personnel Recovery in the Department of Defense. (o) Mortuary affairs. Contractor... Commander or as directed by the Secretary of Defense. (2) Contract performance in support of U.S. Armed...
Report to Congress on the Indemnification of Contractors Performing Environmental Restoration
1993-11-01
munitions dating from World War I. This led true if the contractor is uninsured or has inadequate to the discovery that this residential area had once...application of this authority to the Pab. L. 8545 , he National Defemse Contracts Act" specific circumstances of an environmental restoration I contracting
Real-time bio-sensors for enhanced C2ISR operator performance
NASA Astrophysics Data System (ADS)
Miller, James C.
2005-05-01
The objectives of two Air Force Small Business research topics were to develop a real-time, unobtrusive, biological sensing and monitoring technology for evaluating cognitive readiness in command and control environments (i.e., console operators). We sought an individualized status monitoring system for command and control operators and teams. The system was to consist of a collection of bio-sensing technologies and processing and feedback algorithms that could eventually guide the effective incorporation of fatigue-adaptive workload interventions into weapon systems to mitigate episodes of cognitive overload and lapses in operator attention that often result in missed signals and catastrophic failures. Contractors set about determining what electro-physiological and other indicators of compromised operator states are most amenable for unobtrusive monitoring of psychophysiological and warfighter performance data. They proposed multi-sensor platforms of bio-sensing technologies for development. The sensors will be continuously-wearable or off-body and will not require complicated or uncomfortable preparation. A general overview of the proposed approaches and of progress toward the objective is presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, M.J.; Crutcher, J.W.
1991-07-01
In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1987 and 1988, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 397 East 3rd South Street, Monticello, Utah. The Pollutantmore » Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, M.J.; Crutcher, J.W.
1991-07-01
In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986 and 1987, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 464 South 1st East Street, Monticello, Utah. The Pollutantmore » Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, M.J.; Crutcher, J.W.
1991-07-01
In 1980 the iste of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1987 and 1988, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 87 East 500 South Street, Monticello, Utah. The Pollutantmore » Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, M.J.; Crutcher, J.W.
1991-07-01
In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984 UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 16 East 5th South Street, Monticello, Utah. The Pollutant Assessments Groupmore » (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less
The JWST/NIRSpec instrument: update on status and performances
NASA Astrophysics Data System (ADS)
Birkmann, Stephan M.; Ferruit, Pierre; Rawle, Tim; Sirianni, Marco; Alves de Oliveira, Catarina; Böker, Torsten; Giardino, Giovanna; Lützgendorf, Nora; Marston, Anthony; Stuhlinger, Martin; te Plate, Maurice B. J.; Jensen, Peter; Rumler, Peter; Dorner, Bernhard; Karl, Hermann; Mosner, Peter; Wright, Raymond H.; Rapp, Robert
2016-07-01
The Near-Infrared Spectrograph (NIRSpec) is one of the four instruments on the James Webb Space Telescope (JWST) which is scheduled for launch in 2018. NIRSpec is developed by the European Space Agency (ESA) with Airbus Defense and Space Germany as prime contractor. The instrument offers seven dispersers covering the wavelength range from 0.6 to 5.3 micron with resolutions from R ˜ 100 to R ˜ 2700. NIRSpec will be capable of obtaining spectra for more than 100 objects simultaneously using an array of micro-shutters. It also features an integral field unit with 3" x 3" field of view and a range of slits for high contrast spectroscopy of individual objects and time series observations of e.g. transiting exoplanets. NIRSpec is in its final flight configuration and underwent cryogenic performance testing at the Goddard Space Flight Center in Winter 2015/16 as part of the Integrated Science Instrument Module (ISIM). We present the current status of the instrument and also provide an update on NIRSpec performances based on results from the ISIM level test campaign.
The advantages of cost plus award fee contracts
NASA Technical Reports Server (NTRS)
Keathley, William C.
1994-01-01
A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.
Investigation of Micro- and Macro-Scale Transport Processes for Improved Fuel Cell Performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gu, Wenbin
2014-08-29
This report documents the work performed by General Motors (GM) under the Cooperative agreement No. DE-EE0000470, “Investigation of Micro- and Macro-Scale Transport Processes for Improved Fuel Cell Performance,” in collaboration with the Penn State University (PSU), University of Tennessee Knoxville (UTK), Rochester Institute of Technology (RIT), and University of Rochester (UR) via subcontracts. The overall objectives of the project are to investigate and synthesize fundamental understanding of transport phenomena at both the macro- and micro-scales for the development of a down-the-channel model that accounts for all transport domains in a broad operating space. GM as a prime contractor focused onmore » cell level experiments and modeling, and the Universities as subcontractors worked toward fundamental understanding of each component and associated interface.« less
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Energize New York -- Residential Energy Efficiency Market Transformation in New York
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bregman, Thomas M.
2013-12-31
Energize New York (ENY) is focused on addressing known barriers to widespread energy efficiency (EE) adoption by property owners. In simple terms ENY works to; 1) increase homeowner trust by using known and trusted community leaders to communicate their own positive experiences with EE and ENY, 2) reduce friction points by integrating support staff and creative use of technology that ease a homeowner’s way forward through the EE upgrade process, 3) increase homeowner knowledge and trust of specific EE benefits through access to the ENY energy coach, 4) provide information on available financing options that show benefits (e.g. positive cashmore » flow), and 5) provide tools and mechanisms that give homeowners greater comfort in evaluating and selecting the right contractor. These five fundamental program aspects are supported by a hyper-local communications and outreach model and a “lead by example” philosophy that requires community leaders to step forward and model energy efficiency behavior by example. In the communities where the program has successfully engaged local leadership and “trusted community sources” there has been a significant increase in the uptake of energy efficiency work. Quantitatively this growth translated into an increase of 240% in completed Home Performance projects from the two year pre-pilot period (2009-10) to the two year post-pilot period (2012-13). Additionally, the program has seen measureable increases in the output and performance of contractors who are members of the Energize Comfort Corps, a program innovation which included a subset of the NYSERDA approved and Building Performance Institute accredited home performance contractors. This innovation, launched in the later stages of the pilot, is paired with the Energize Contractor Ratings Index (CRI) and helps frame the provider market by giving homeowners a mechanism to provide and receive feedback on their contractor experience. The data incorporated into the CRI along with the ECC selection process, has measurably reduced a key decision barrier (“which contractor should I use”) for homeowners engaged in the EE decision making process.« less
NASA Technical Reports Server (NTRS)
Staiger, P. J.; Penko, P. F.
1982-01-01
The conceptual design study of a potential early commercial MHD power plant (CSPEC) is described and the results are summarized. Each of two contractors did a conceptual design of an approximtely 1000 MWe open-cycle MHD/steam plant with oxygen enriched combustion air preheated to an intermediate temperatue in a metallic heat exchanger. The contractors were close in their overall plant efficiency estimates but differed in their capital cost and cost of electricity estimates, primarily because of differences in balance-of-plant material, contingency, and operating and maintenance cost estimates. One contractor concluded that its MHD plant design compared favorably in cost of electricity with conventional coal-fired steam plants. The other contractor is making such a comparison as part of a follow-on study. Each contractor did a preliminary investigation of part-load performance and plant availability. The results of NASA studies investigating the effect of plant size and oxidizer preheat temperature on the performance of CSPEC-type MHD plants are also described. The efficiency of a 1000 MWe plant is about three points higher than of a 200 MWe plant. Preheating to 1600 F gives an efficiency about one and one-half points higher than preheating to 800 F for all plant sizes. For each plant size and preheat temperature there is an oxidizer enrichment level and MHD generator length that gives the highest plant efficiency.
78 FR 75912 - Procurement List; Addition and Deletion
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-13
... nonprofit agency to provide the service and impact of the addition on the current or most recent contractors... would accomplish the objectives of the Javits-Wagner-O'Day Act (41 U.S.C. 8501-8506) in connection with... would accomplish the objectives of the Javits-Wagner-O'Day Act (41 U.S.C. 8501-8506) in connection with...
NASA Technical Reports Server (NTRS)
Thomas, LeAnn; Doreswamy, Rajiv N.
2008-01-01
Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.
Physical therapy mandates by Medicare administrative contractors: effective or wasteful?
Fehring, Thomas K; Fehring, Keith; Odum, Susan M; Halsey, David
2013-10-01
Documentation of medical necessity for arthroplasty has come under scrutiny by Medicare. In some jurisdictions three months of physical therapy prior to arthroplasty has been mandated. The purpose of this study was to determine the efficacy and cost of this policy to treat advanced osteoarthritis. A systematic review was performed to assimilate efficacy data for physical therapy in patients with advanced osteoarthritis. The number of arthroplasties performed annually was obtained to calculate cost. Evidence-based studies documenting the efficacy of physical therapy in treating advanced arthritis are lacking with a potential cost of 36-68 million dollars. Physical therapy mandates by administrative contractors are not only ineffective but are costly without patient benefit. Medical necessity documentation should be driven by orthopedists not retroactively by Medicare contractors. Copyright © 2013 Elsevier Inc. All rights reserved.
Code of Federal Regulations, 2014 CFR
2014-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
Code of Federal Regulations, 2012 CFR
2012-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
Code of Federal Regulations, 2013 CFR
2013-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Federal government in connection with tort claims arising out of the contractor's performance? 900.188 Section 900.188 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN HEALTH SERVICE... ASSISTANCE ACT Federal Tort Claims Act Coverage General Provisions § 900.188 To what extent shall the...
48 CFR 1852.219-84 - Limitation of the principal investigator-STTR program.
Code of Federal Regulations, 2012 CFR
2012-10-01
...—STTR Program (OCT 2006) (a) The primary employment of the principal investigator (PI) identified in... in the employ of the SBC/Contractor or RI. (b) The PI is considered to be key personnel in the performance of this contract. The SBC/Contractor, whether or not the employer of the PI, shall exercise...
48 CFR 1852.219-84 - Limitation of the principal investigator-STTR program.
Code of Federal Regulations, 2013 CFR
2013-10-01
...—STTR Program (OCT 2006) (a) The primary employment of the principal investigator (PI) identified in... in the employ of the SBC/Contractor or RI. (b) The PI is considered to be key personnel in the performance of this contract. The SBC/Contractor, whether or not the employer of the PI, shall exercise...
48 CFR 1852.219-84 - Limitation of the principal investigator-STTR program.
Code of Federal Regulations, 2014 CFR
2014-10-01
...—STTR Program (OCT 2006) (a) The primary employment of the principal investigator (PI) identified in... in the employ of the SBC/Contractor or RI. (b) The PI is considered to be key personnel in the performance of this contract. The SBC/Contractor, whether or not the employer of the PI, shall exercise...
48 CFR 1852.219-84 - Limitation of the principal investigator-STTR program.
Code of Federal Regulations, 2011 CFR
2011-10-01
...—STTR Program (OCT 2006) (a) The primary employment of the principal investigator (PI) identified in... in the employ of the SBC/Contractor or RI. (b) The PI is considered to be key personnel in the performance of this contract. The SBC/Contractor, whether or not the employer of the PI, shall exercise...
Motivation for a High Explosive Testing Program in South Africa
2015-12-04
following): Contractor Performance Evaluation Foreign Government Information Administrative or Operational Use Specific Authority ~ Proprietary lnformati...Software Document~tion Administrative or Operational Use B Foreign Governmen Information 0 D. Distribution authorized to the Department of Defense...and U.S. DoD Contractors only (check the following): 0 § Foreign Government Information Critical Technology Administrative or Operational Use B
Using the Technology Acceptance Model (TAM) to Conduct an Analysis of User Perceptions
ERIC Educational Resources Information Center
Young, Cheryl E.
2010-01-01
Contractor performance evaluation enables agents to make informed purchasing decisions, provide feedback to contractors/vendors, and help improve service quality and customer satisfaction. However, both public and private organizations sometimes fail to do so, as is the case at a division of a government organization located in a northeastern U.S.…
48 CFR 42.602 - Assignment and location.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Assignment and location. (a) A CACO may be assigned only when (1) the contractor has at least two locations with resident ACO's or (2) the need for a CACO is approved by the agency head or designee (for this... devoted to a single contractor). One of the resident ACO's may be designated to perform the CACO functions...
48 CFR 42.602 - Assignment and location.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Assignment and location. (a) A CACO may be assigned only when (1) the contractor has at least two locations with resident ACO's or (2) the need for a CACO is approved by the agency head or designee (for this... devoted to a single contractor). One of the resident ACO's may be designated to perform the CACO functions...
Orion Launch Abort System Jettison Motor Performance During Exploration Flight Test 1
NASA Technical Reports Server (NTRS)
McCauley, Rachel J.; Davidson, John B.; Winski, Richard G.
2015-01-01
This paper presents an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System performing Orion nominal flight mission critical objectives. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. Selected Launch Abort System flight test data is presented and discussed in the paper. Through flight test data, Launch Abort System performance trends have been derived that will prove valuable to future flights as well as the manned space program.
NASA Astrophysics Data System (ADS)
1992-06-01
The House Committee on Science, Space, and Technology asked NASA to study software development issues for the space station. How well NASA has implemented key software engineering practices for the station was asked. Specifically, the objectives were to determine: (1) if independent verification and validation techniques are being used to ensure that critical software meets specified requirements and functions; (2) if NASA has incorporated software risk management techniques into program; (3) whether standards are in place that will prescribe a disciplined, uniform approach to software development; and (4) if software support tools will help, as intended, to maximize efficiency in developing and maintaining the software. To meet the objectives, NASA proceeded: (1) reviewing and analyzing software development objectives and strategies contained in NASA conference publications; (2) reviewing and analyzing NASA, other government, and industry guidelines for establishing good software development practices; (3) reviewing and analyzing technical proposals and contracts; (4) reviewing and analyzing software management plans, risk management plans, and program requirements; (4) reviewing and analyzing reports prepared by NASA and contractor officials that identified key issues and challenges facing the program; (5) obtaining expert opinions on what constitutes appropriate independent V-and-V and software risk management activities; (6) interviewing program officials at NASA headquarters in Washington, DC; at the Space Station Program Office in Reston, Virginia; and at the three work package centers; Johnson in Houston, Texas; Marshall in Huntsville, Alabama; and Lewis in Cleveland, Ohio; and (7) interviewing contractor officials doing work for NASA at Johnson and Marshall. The audit work was performed in accordance with generally accepted government auditing standards, between April 1991 and May 1992.
Facilities Capital as a Factor in Contract Pricing,
1985-05-01
resulting from new investment. Investments must provide contractors with a rate of return competitive with what they can earn on investments elsewhere...DoD’s profit objective rate (profit objective as a percentage of cost objective) is determined by the level of facilities capital employed, the mix of...business base were analyzed. These sources serve as independent checks on each other and present a consistent picture of what has occurred. In each
Information Technology and the Human Research Facility
NASA Technical Reports Server (NTRS)
Klee, Margaret
2002-01-01
This slide presentation reviews how information technology supports the Human Research Facility (HRF) and specifically the uses that contractor has for the information. There is information about the contractor, the HRF, some of the experiments that were performed using the HRF on board the Shuttle, overviews of the data architecture, and software both commercial and specially developed software for the specific experiments.
2008-06-13
USE PRIVATE SECURITY CONTRACTORS TO PROTECT U.S. DIPLOMATS 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 6. AUTHOR( S ...Special Agent Derek Dela-Cruz 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Command and General Staff College...
Code of Federal Regulations, 2010 CFR
2010-07-01
... having significant difficulty performing his or her job. 1. A contractor is required to make reasonable... qualified if he or she satisfies all the skill, experience, education and other job-related selection... qualified” if he or she is qualified for a job, except that, because of a disability, he or she needs a...
20 CFR 435.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... must be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms of functions to be performed or performance...
28 CFR 70.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Consideration must be given to such matters as contractor integrity, record of past performance, financial and... performed or performance required, including the range of acceptable characteristics or minimum acceptable...
43 CFR 12.944 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Consideration shall be given to such matters as contractor integrity, record of past performance, financial and... performed or performance required, including the range of acceptable characteristics or minimum acceptable...
49 CFR 19.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Consideration shall be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms of functions to be performed or performance...
22 CFR 518.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... Consideration shall be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms or functions to be performed or performance...
48 CFR 1542.1503 - Procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... System (CPARS) which has connectivity with the Past Performance Information Retrieval System (PPIRS). (b... MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 1542.1503 Procedures. (a) Past...
48 CFR 1542.1503 - Procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... System (CPARS) which has connectivity with the Past Performance Information Retrieval System (PPIRS). (b... MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information 1542.1503 Procedures. (a) Past...
Privatized Military Operations
2006-01-01
environment such as that in Abu Grahib prison , where military personnel tasked with similar duties to that of contractors have been held legally accountable... Grahib Prison . The Washington Post. Office of Management and Budget Circular A-76. (August 4, 1988. Revised 1999). Performance of Commercial...downsizes the military after the Global War on Terror as it did after the Cold War. Private contractors depend largely upon former service members to
Government Furnished Property: Management and Accounting.
1986-06-01
PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION I(if applicable) %J 8c ADDRESS (City. State, anid ZIP Code) 10 SOURCE OF FUNDING NUMBERS e...DAR), Armed Services Procurement Regulation (ASPR), GAO aid service comptroller guidelines, and contract administration procedures. D. SCOPE OF STUDY...Contractor-acquired property is property procured or otherwise provided by the contractor for the performance of a . contract, title to which is vested in
Contract Financing for Small Business
1981-11-01
problem. Small business contractors devote considerable management attention to operating capital and cash flow. Small business contractors are keenly...CONTRACT FINANCING 0FOR SMALL BUSINESS November 1981 -s Paul R. McClenon Prepared pursuant to Department of Defense Contract No. MDA903-81-C-0166...34 i 12 17046 DistIbufios Unlimted !I CONTRACT FINANCING FOR SMALL BUSINESS EXECUTIVE SUMMHARY To perform effectively on a contract, a firm needs
Expert Meeting Report: HVAC Fault Detection, Diagnosis, and Repair/Replacement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Springer, David
The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.
Expert Meeting Report: HVAC Fault Detection, DIagnosis, and Repair/Replacement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Springer, David
The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.
48 CFR 1542.1503 - Procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... System (CPARS) which has connectivity with the Past Performance Information Retrieval System (PPIRS). (b... MANAGEMENT CONTRACT ADMINISTRATION Contractor Performance Information § 1542.1503 Procedures. (a) Past...
Development of an Experiment High Performance Nozzle Research Program
NASA Technical Reports Server (NTRS)
2004-01-01
As proposed in the above OAI/NASA Glenn Research Center (GRC) Co-Operative Agreement the objective of the work was to provide consultation and assistance to the NASA GRC GTX Rocket Based Combined Cycle (RBCC) Program Team in planning and developing requirements, scale model concepts, and plans for an experimental nozzle research program. The GTX was one of the launch vehicle concepts being studied as a possible future replacement for the aging NASA Space Shuttle, and was one RBCC element in the ongoing NASA Access to Space R&D Program (Reference 1). The ultimate program objective was the development of an appropriate experimental research program to evaluate and validate proposed nozzle concepts, and thereby result in the optimization of a high performance nozzle for the GTX launch vehicle. Included in this task were the identification of appropriate existing test facilities, development of requirements for new non-existent test rigs and fixtures, develop scale nozzle model concepts, and propose corresponding test plans. Also included were the evaluation of originally proposed and alternate nozzle designs (in-house and contractor), evaluation of Computational Fluid Dynamics (CFD) study results, and make recommendations for geometric changes to result in improved nozzle thrust coefficient performance (Cfg).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-01-01
Tiger Team Assessments and Technical Safety Appraisals (TSA) were reviewed and evaluated for concerns in the Maintenance Area (MA). Two hundred and thirty one (231) maintenance concerns were identified by the Tiger Team Assessments and TSA reports. These recurring concerns appear below. A summary of the Noteworthy Practices that were identified and a compilation of the maintenance concerns for each performance objective that were not considered as recurring are also included. Where the Tiger Team Assessment and TSA identified the operating contractor or facility by name, the concern has been modified to remove the name while retaining the intent ofmore » the comment.« less
48 CFR 236.604 - Performance evaluation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...
48 CFR 236.604 - Performance evaluation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...
48 CFR 236.604 - Performance evaluation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...
48 CFR 236.604 - Performance evaluation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Performance evaluation... Architect-Engineer Services 236.604 Performance evaluation. Prepare a separate performance evaluation after... familiar with the architect-engineer contractor's performance. [76 FR 58155, Sept. 20, 2011] ...
Fluid Acquisition and Resupply Experiments on Space Shuttle Flights STS-53 and STS-57
NASA Technical Reports Server (NTRS)
Dominick, S. M.; Tegart, J. R.; Driscoll, S. L.; Sledd, J. D.; Hastings, L. J.
2011-01-01
The Fluid Acquisition and Resupply Experiment (FARE) program, managed by the Marshall Space Flight Center Space Propulsion Branch with Martin Marietta Civil Space and Communications as the contractor, consisted of two flights designated FARE I and FARE II. FARE I flew in December 1992 on STS-53 with a screen channel liquid acquisition device (LAD) and FARE II flew in June 1993 on STS-57 with a vane-type LAD. Thus, the FARE I and II flights represent the two basic LAD categories usually considered for in-space fluid management. Although both LAD types have been used extensively, the usefulness of the on-orbit data has been constrained by the lack of experimentation beyond predicted performance limits, including both propellant fill and expulsion. Therefore, the FARE tests were designed to obtain data that would satisfy two primary objectives: (1) Demonstrate the performance of the two types of LADs, screen channel and vane, and (2) support the anchoring of analytical models. Both flights were considered highly successful in meeting these two primary objectives.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, M.J.; Crutcher, J.W.
1991-07-01
In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986 and 1987, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 600 South Cemetery Road (updated by San Juan Countymore » and the state of Utah to 600 South Clayhill Drive), Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs.« less
Code of Federal Regulations, 2014 CFR
2014-10-01
... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1502 Policy. DOL contracting officers are required to use or interface with the Past Performance Information Retrieval System (PPIRS), and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1502 Policy. DOL contracting officers are required to use or interface with the Past Performance Information Retrieval System (PPIRS), and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1502 Policy. DOL contracting officers are required to use or interface with the Past Performance Information Retrieval System (PPIRS), and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1502 Policy. DOL contracting officers are required to use or interface with the Past Performance Information Retrieval System (PPIRS), and...
Code of Federal Regulations, 2013 CFR
2013-10-01
... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 2942.1502 Policy. DOL contracting officers are required to use or interface with the Past Performance Information Retrieval System (PPIRS), and...
Hsueh, Sung-Lin; Yan, Min-Ren
2013-01-01
The trends of the green supply chain are attributed to pressures from the environment and from customers. Green innovation is a practice for creating competitive advantage in sustainable development. To keep up with the changing business environment, the construction industry needs an appropriate assessment tool to examine the intrinsic and extrinsic effects regarding corporate competitive advantage. From the viewpoint of energy and environmental protection, this study combines four scientific methodologies to develop an assessment model for the green innovation of contractors. System dynamics can be used to estimate the future trends for the overall industrial structure and is useful in predicting competitive advantage in the industry. The analytic hierarchy process (AHP) and utility theory focus on the customer's attitude toward risk and are useful for comprehending changes in objective requirements in the environment. Fuzzy logic can simplify complicated intrinsic and extrinsic factors and express them with a number or ratio that is easy to understand. The proposed assessment model can be used as a reference to guide the government in examining the public constructions that qualified green contractors participate in. Additionally, the assessment model serves an indicator of relative competitiveness that can help the general contractor and subcontractor to evaluate themselves and further green innovations.
2013-01-01
The trends of the green supply chain are attributed to pressures from the environment and from customers. Green innovation is a practice for creating competitive advantage in sustainable development. To keep up with the changing business environment, the construction industry needs an appropriate assessment tool to examine the intrinsic and extrinsic effects regarding corporate competitive advantage. From the viewpoint of energy and environmental protection, this study combines four scientific methodologies to develop an assessment model for the green innovation of contractors. System dynamics can be used to estimate the future trends for the overall industrial structure and is useful in predicting competitive advantage in the industry. The analytic hierarchy process (AHP) and utility theory focus on the customer's attitude toward risk and are useful for comprehending changes in objective requirements in the environment. Fuzzy logic can simplify complicated intrinsic and extrinsic factors and express them with a number or ratio that is easy to understand. The proposed assessment model can be used as a reference to guide the government in examining the public constructions that qualified green contractors participate in. Additionally, the assessment model serves an indicator of relative competitiveness that can help the general contractor and subcontractor to evaluate themselves and further green innovations. PMID:24311979
Implementation of Insight Responsibilities in Process Engineering
NASA Technical Reports Server (NTRS)
Osborne, Deborah M.
1997-01-01
This report describes an approach for evaluating flight readiness (COFR) and contractor performance evaluation (award fee) as part of the insight role of NASA Process Engineering at Kennedy Space Center. Several evaluation methods are presented, including systems engineering evaluations and use of systems performance data. The transition from an oversight function to the insight function is described. The types of analytical tools appropriate for achieving the flight readiness and contractor performance evaluation goals are described and examples are provided. Special emphasis is placed upon short and small run statistical quality control techniques. Training requirements for system engineers are delineated. The approach described herein would be equally appropriate in other directorates at Kennedy Space Center.
Wu, Zezhou; Yu, Ann T W; Shen, Liyin
2017-02-01
The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.
2011-12-01
and Suspension & Debarment Hearing, February 28, 2011, 9, http://www.wartimecontracting.gov/docs/hearing2011–02–28_testimony- Ginman.pdf (accessed...Counterinsurgency. December, 2006. Ginman, Richard T. Ensuring Contractor Accountability: Past Performance and Suspension & Debarment ...tied to the enemy. This vetting process helped debar or suspend 10 prime contractors with ties to criminal networks or the insurgency. In his written
Iraq Reconstruction Project Terminations Represent a Range of Actions
2008-10-27
included in the FAR, Subpart 9.4. Contractors can be debarred for a number of criminal actions, including fraud, theft, embezzlement, bribery ...Poor performance alone, without any showing of fraud or unethical behavior, will not generally result in the contractor being suspended or debarred...taken in one instance but not in another. In the first instance, an Iraqi construction firm was debarred in June 2006 for allegations of bribery
Performance-Based Logistics, Contractor Logistics Support, and Stryker
2007-06-15
automotive , armament, missile, communications, special devices, and ground equipment repair. The essential maintenance task for the FMC is to maintain...technologies and welding techniques into their production processes. Finally, GDLS’s use of progressive management techniques and supply chain information...C4ISR, MEP) per the NMC criteria in the -10 manual, the contractors system only focuses on the platform or automotive status. Thus a vehicle “up” for
10 CFR 706.2 - Basis and scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ENERGY SECURITY POLICIES AND PRACTICES RELATING TO LABOR-MANAGEMENT RELATIONS General § 706.2 Basis and... objectives for labor-management relations in the DOE program, namely: (a) Wholehearted acceptance by... efficient management expected from DOE contractors; (e) Minimum interference with the traditional rights and...
Shuttle Upgrade Using 5-Segment Booster (FSB)
NASA Technical Reports Server (NTRS)
Sauvageau, Donald R.; Huppi, Hal D.; McCool, A. A. (Technical Monitor)
2000-01-01
In support of NASA's continuing effort to improve the over-all safety and reliability of the Shuttle system- a 5-segment booster (FSB) has been identified as an approach to satisfy that overall objective. To assess the feasibility of a 5-segment booster approach, NASA issued a feasibility study contract to evaluate the potential of a 5-segment booster to improve the overall capability of the Shuttle system, especially evaluating the potential to increase the system reliability and safety. In order to effectively evaluate the feasibility of the 5-segment concept, a four-member contractor team was established under the direction of NASA Marshall Space Flight Center (MSFC). MSFC provided the overall program oversight and integration as well as program contractual management. The contractor team consisted of Thiokol, Boeing North American Huntington Beach (BNA), Lockheed Martin Michoud Space Systems (LMMSS) and United Space Alliance (USA) and their subcontractor bd Systems (Control Dynamics Division, Huntsville, AL). United Space Alliance included the former members of United Space Booster Incorporated (USBI) who managed the booster element portion of the current Shuttle solid rocket boosters. Thiokol was responsible for the overall integration and coordination of the contractor team across all of the booster elements. They were also responsible for all of the motor modification evaluations. Boeing North American (BNA) was responsible for all systems integration analyses, generation of loads and environments. and performance and abort mode capabilities. Lockheed Martin Michoud Space Systems (LMMSS) was responsible for evaluating the impacts of any changes to the booster on the external tank (ET), and evaluating any design changes on the external tank necessary to accommodate the FSB. USA. including the former USBI contingent. was responsible for evaluating any modifications to facilities at the launch site as well as any booster component design modifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... single-agency task order and delivery order contracts, the contracting officer may require performance... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1502 Policy. (a) Past performance... orders with a period of performance, including options, exceeding one year. These evaluations are...
48 CFR 2936.604 - Performance evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...
48 CFR 2936.604 - Performance evaluation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...
48 CFR 2936.604 - Performance evaluation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...
48 CFR 2936.604 - Performance evaluation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...
48 CFR 2936.604 - Performance evaluation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Performance evaluation... Performance evaluation. (a) The HCA must establish procedures to evaluate architect-engineer contractor performance as required in FAR 36.604. Normally, the performance report must be prepared by the contracting...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 1 2010-10-01 2010-10-01 false Purpose. 94.1 Section 94.1 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION RESPONSIBLE PROSPECTIVE CONTRACTORS § 94.1 Purpose. This part promotes objectivity in research by establishing standards to ensure there is no...
Code of Federal Regulations, 2012 CFR
2012-10-01
... at a DOE Defense Nuclear Facility is necessary, DOE contractors and subcontractors at DOE Defense Nuclear Facilities shall accomplish work force restructuring or displacement so as to mitigate social and... with the objectives of section 3161 of the National Defense Authorization Act for Fiscal Year 1993, 42...
Code of Federal Regulations, 2013 CFR
2013-10-01
... at a DOE Defense Nuclear Facility is necessary, DOE contractors and subcontractors at DOE Defense Nuclear Facilities shall accomplish work force restructuring or displacement so as to mitigate social and... with the objectives of section 3161 of the National Defense Authorization Act for Fiscal Year 1993, 42...
Code of Federal Regulations, 2011 CFR
2011-10-01
... at a DOE Defense Nuclear Facility is necessary, DOE contractors and subcontractors at DOE Defense Nuclear Facilities shall accomplish work force restructuring or displacement so as to mitigate social and... with the objectives of section 3161 of the National Defense Authorization Act for Fiscal Year 1993, 42...
Code of Federal Regulations, 2014 CFR
2014-10-01
... at a DOE Defense Nuclear Facility is necessary, DOE contractors and subcontractors at DOE Defense Nuclear Facilities shall accomplish work force restructuring or displacement so as to mitigate social and... with the objectives of section 3161 of the National Defense Authorization Act for Fiscal Year 1993, 42...
Financial Reporting of Government Property in the Custody of Contractors
1997-08-04
financial reporting of Government property, and we assessed compliance with applicable laws and regulations. This report addresses the use of the Contract...Property Management System for financial reporting of Government property. Issuance of this report does not complete our announced audit objectives. We
1984-09-01
and the heads of its employees. This can be very compendious and some way is needed to I t the responsibility to manageable proportions. The...is manageable by the government on the other. -page 143- C. Government Culpability A bare witholding of factual information material to contract... management system which was at variance with what previous -page 190- contractors had used in performing the same contract. In these regards, the contractor
Navy Acquisition: Cost, Schedule, and Performance of New Submarine Combat Systems
1990-01-01
1985). Page 8 GAO/NSIAD-90-72 Submarine Combat Systems Chapter 1 Introduction In December 1983 the Navy awarded the International Business Machines...contracts to the General Electric Com- pany and the International Business Machines. In December 1987 the Navy selected General Electric as the prime...contractor and International Business Machines as the "follower" contractor. On March 31, 1988. the Navy awarded General Electric a $1.84 billion fixed
Code of Federal Regulations, 2011 CFR
2011-10-01
... are exempt from private sector performance, as addressed in DoD Instruction 1100.22. (S-70) Contracts... a contract for performance of the acquisition functions closely associated with inherently... functions; (B) Will oversee contractor performance of the contract; and (C) Will perform all inherently...
Code of Federal Regulations, 2010 CFR
2010-10-01
... are exempt from private sector performance, as addressed in DoD Instruction 1100.22. (S-70) Contracts... a contract for performance of the acquisition functions closely associated with inherently... functions; (B) Will oversee contractor performance of the contract; and (C) Will perform all inherently...
48 CFR 32.1007 - Administration and payment of performance-based payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor's experience, performance record, reliability, financial strength, and the adequacy of controls... of performance-based payments. 32.1007 Section 32.1007 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Performance-Based Payments 32.1007...
Code of Federal Regulations, 2014 CFR
2014-10-01
... System (CPARS) and Past Performance Information Retrieval System (PPIRS) metric tools to measure the... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1501 General. (a) Past performance information (including the ratings and supporting narratives) is relevant information, for future...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Reporting System (CPARS) and Past Performance Information Retrieval System (PPIRS) metric tools to measure... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1501 General. (a) Past performance information (including the ratings and supporting narratives) is relevant information, for future...
Hasan, Abid; Jha, Kumar Neeraj
2013-01-01
Safety incentive and penalty (I/P) provisions in construction contracts are one of the most common forms of I/P. Contradictory opinions on the effectiveness of these provisions have been expressed in the literature. Statistics on safety provisions were collected from 32 construction projects, which include both types of contracts - those with safety I/P provisions and those without them. Although inclusion of safety I/P provisions in contracts helps in improving the overall safety performance in construction projects, further scope for improvement still exists. Literature review and structured personal interviews, coupled with a survey based on preliminary questionnaire, revealed that successful formulation and implementation of such provisions are dependent on 25 attributes which need the attention of both clients and contractors. A questionnaire-based survey was conducted to evaluate these attributes. The six factors extracted by carrying out factor analysis are: incentive distribution method, proper labour training, special attention to risky situations, role of safety committee and sub-contractors, specialised works and safety equipments, and right form of I/P. If taken care of, these attributes have the potential to improve the safety performance in construction projects. The results would be useful to clients and contractors in implementing the safety I/P provisions and thereby improving safety performance.
48 CFR 1536.201 - Evaluation of contracting performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performance. 1536.201 Section 1536.201 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY... Contracting for Construction 1536.201 Evaluation of contracting performance. (a) The Contracting Officer will... will file the form in the contractor performance evaluation files which it maintains. (e) The Quality...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
Space Surveillance Network (SSN) Optical Augmentation (SOA)
1999-04-01
physical characteristics, and the geocentric and topocentric positions of each satellite in the deep space object catalog. The SKYMAP propagator...maintains the geocentric and topocentric positions and recomputes the position of each object several times a minute. For each scheduling...AINTENANCE Mission Personnel ( Staffing ) Officers 0.0 0.0 0.0 0.0 $90K/person (0) Enlisted 0.0 0.0 0.0 0.0 $45K/person (0) Contractor 20.0
Code of Federal Regulations, 2011 CFR
2011-10-01
... the Past Performance Information Retrieval System (PPIRS) at www.ppirs.gov. The process for submitting... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1503 Procedures. (a.... Those individuals identified may obtain information for the evaluation of performance from the program...
Code of Federal Regulations, 2012 CFR
2012-10-01
... the Past Performance Information Retrieval System (PPIRS) at www.ppirs.gov. The process for submitting... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1503 Procedures. (a.... Those individuals identified may obtain information for the evaluation of performance from the program...
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1503 Procedures. (a) Agency procedures for the past performance evaluation system shall generally provide for input to the.... Those individuals identified may obtain information for the evaluation of performance from the program...
48 CFR 970.0970 - Performance guarantees.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...
48 CFR 970.0970 - Performance guarantees.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...
48 CFR 970.0970 - Performance guarantees.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...
48 CFR 970.0970 - Performance guarantees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...
48 CFR 2452.237-70 - Key personnel.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contracts when it is necessary for contract performance to identify the contractor's key personnel: Key... perform as follows: [List Key Personnel and/or positions, and tasks, percentage of effort, number of hours...
An optimal user-interface for EPIMS database conversions and SSQ 25002 EEE parts screening
NASA Technical Reports Server (NTRS)
Watson, John C.
1996-01-01
The Electrical, Electronic, and Electromechanical (EEE) Parts Information Management System (EPIMS) database was selected by the International Space Station Parts Control Board for providing parts information to NASA managers and contractors. Parts data is transferred to the EPIMS database by converting parts list data to the EP1MS Data Exchange File Format. In general, parts list information received from contractors and suppliers does not convert directly into the EPIMS Data Exchange File Format. Often parts lists use different variable and record field assignments. Many of the EPES variables are not defined in the parts lists received. The objective of this work was to develop an automated system for translating parts lists into the EPIMS Data Exchange File Format for upload into the EPIMS database. Once EEE parts information has been transferred to the EPIMS database it is necessary to screen parts data in accordance with the provisions of the SSQ 25002 Supplemental List of Qualified Electrical, Electronic, and Electromechanical Parts, Manufacturers, and Laboratories (QEPM&L). The SSQ 2S002 standards are used to identify parts which satisfy the requirements for spacecraft applications. An additional objective for this work was to develop an automated system which would screen EEE parts information against the SSQ 2S002 to inform managers of the qualification status of parts used in spacecraft applications. The EPIMS Database Conversion and SSQ 25002 User Interfaces are designed to interface through the World-Wide-Web(WWW)/Internet to provide accessibility by NASA managers and contractors.
2009-04-30
Iraq Reconstruction,400 Army Navy Drive,Arlington,VA,22202-4704 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S...contractor, Blackwater , that resulted in the death of 17 Iraqi civilians. As a result of the incident, DoD and DoS agreed on core standards...have surfaced over the years concerning the oversight, control, cost, and legal status of PSCs, the Blackwater incident in September 2007, during which
Government - contractor interaction
NASA Technical Reports Server (NTRS)
Thomas, D. M.
1983-01-01
The development of the Administrative Contracting Officer represents an advance in the Government system of contract management because it provides an individual with knowledge, time, and a specialized function to insure performance of Government contracts. However, the development has created a dichotomy between the award and the post-award function which increases the adversary relationship with Government contractors. This paper advocates that this adversary relationship can be decreased if PCOs and ACOs are provided with opportunities to serve in the assignments of the other.
Region 7 Laboratory Information Management System
This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.
Making business decisions using trend information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prevette, S.S., Westinghouse Hanford, Richland, WA
1997-11-24
Performance Measures, and the trend information that results from their analyses, can help managers in their decision making process. The business decisions that are to be discussed are: Assignment of limited Resources, Funding, Budget; Contractor Rewards/Incentives; Where to focus Process Improvement, Reengineering efforts; When to ask ``What Happened?!!``; Determine if a previous decision was effectively implemented. Trending can provide an input for rational Business Decisions. Key Element is determination of whether or not a significant trend exists - segregating Common Cause from Special Cause. The Control Chart is the tool for accomplishment of trending and determining if you are meetingmore » your Business Objectives. Eliminate Numerical Targets; the goal is Significant Improvement. Profound Knowledge requires integrating data results with gut feeling.« less
Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach
NASA Technical Reports Server (NTRS)
Lee, Lydia L.; Ingegneri, Antonino J.; Djam, Melody
2006-01-01
The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.
Strategy Guideline. Transitioning HVAC Companies to Whole House Performance Contractors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burdick, Arlan
2012-05-01
This report describes the findings from research IBACOS conducted related to heating, ventilation, and air conditioning (HVAC) companies who have made the decision to transition to whole house performance contracting (WHPC).
Maintaining the program balance, volumes 1 and 2
NASA Technical Reports Server (NTRS)
Finger, Harold
1991-01-01
In March of 1990, the NASA Administrator asked the Academy to perform a study to address the following questions: (1) has NASA contracted too much of its technical work; (2) has NASA's in-house technical capability eroded over time; (3) is in-house engineering and scientific work important to the development of scientists and engineers; and (4) is NASA still able to attract quality scientists and engineers. A panel from the Academy addressed each question separately and came up with the following recommendations: (1) prepare and issue guidance on technical functional areas reserved for in-house performance; (2) convert contracted technical functions to in-house performance if critical to agency programs; (3) provide policy guidance to the centers to retain in-house projects; (4) examine the project mix at each center against agency goals and objectives; (5) institute an annual critical review for all technical disciplines; (6) modify the agency's contractor accountability process; and (7) seek opportunities for greater delegation of resources and technical decision making.
NASA Technical Reports Server (NTRS)
Skavdahl, H.; Patterson, D. H.
1972-01-01
The initial flight test phase of the modified C-8A airplane was conducted. The primary objective of the testing was to establish the basic airworthiness of the research vehicle. This included verification of the structural design and evaluation of the aircraft's systems. Only a minimum amount of performance testing was scheduled; this has been used to provide a preliminary indication of the airplane's performance and flight characteristics for future flight planning. The testing included flutter and loads investigations up to the maximum design speed. The operational characteristics of all systems were assessed including hydraulics, environmental control system, air ducts, the vectoring conical nozzles, and the stability augmentation system (SAS). Approaches to stall were made at three primary flap settings: up, 30 deg and 65 deg, but full stalls were not scheduled. Minimum control speeds and maneuver margins were checked. All takeoffs and landings were conventional, and STOL performance was not scheduled during this phase of the evaluation.
Gaia challenging performances verification: combination of spacecraft models and test results
NASA Astrophysics Data System (ADS)
Ecale, Eric; Faye, Frédéric; Chassat, François
2016-08-01
To achieve the ambitious scientific objectives of the Gaia mission, extremely stringent performance requirements have been given to the spacecraft contractor (Airbus Defence and Space). For a set of those key-performance requirements (e.g. end-of-mission parallax, maximum detectable magnitude, maximum sky density or attitude control system stability), this paper describes how they are engineered during the whole spacecraft development process, with a focus on the end-to-end performance verification. As far as possible, performances are usually verified by end-to-end tests onground (i.e. before launch). However, the challenging Gaia requirements are not verifiable by such a strategy, principally because no test facility exists to reproduce the expected flight conditions. The Gaia performance verification strategy is therefore based on a mix between analyses (based on spacecraft models) and tests (used to directly feed the models or to correlate them). Emphasis is placed on how to maximize the test contribution to performance verification while keeping the test feasible within an affordable effort. In particular, the paper highlights the contribution of the Gaia Payload Module Thermal Vacuum test to the performance verification before launch. Eventually, an overview of the in-flight payload calibration and in-flight performance verification is provided.
Independent verification of plutonium decontamination on Johnston Atoll (1992--1996)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson-Nichols, M.J.; Wilson, J.E.; McDowell-Boyer, L.M.
1998-05-01
The Field Command, Defense Special Weapons Agency (FCDSWA) (formerly FCDNA) contracted Oak Ridge National Laboratory (ORNL) Environmental Technology Section (ETS) to conduct an independent verification (IV) of the Johnston Atoll (JA) Plutonium Decontamination Project by an interagency agreement with the US Department of Energy in 1992. The main island is contaminated with the transuranic elements plutonium and americium, and soil decontamination activities have been ongoing since 1984. FCDSWA has selected a remedy that employs a system of sorting contaminated particles from the coral/soil matrix, allowing uncontaminated soil to be reused. The objective of IV is to evaluate the effectiveness ofmore » remedial action. The IV contractor`s task is to determine whether the remedial action contractor has effectively reduced contamination to levels within established criteria and whether the supporting documentation describing the remedial action is adequate. ORNL conducted four interrelated tasks from 1992 through 1996 to accomplish the IV mission. This document is a compilation and summary of those activities, in addition to a comprehensive review of the history of the project.« less
7 CFR 1780.67 - Performing construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Performing construction. 1780.67 Section 1780.67..., Constructing and Inspections § 1780.67 Performing construction. Owners are encouraged to accomplish construction through contracts with qualified contractors. Owners may accomplish construction by using their...
7 CFR 1780.67 - Performing construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Performing construction. 1780.67 Section 1780.67..., Constructing and Inspections § 1780.67 Performing construction. Owners are encouraged to accomplish construction through contracts with qualified contractors. Owners may accomplish construction by using their...
10 CFR 851.20 - Management responsibilities and worker rights and responsibilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... responsibilities. 851.20 Section 851.20 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Specific...) Management responsibilities. Contractors are responsible for the safety and health of their workforce and... objectives for the worker safety and health program; (2) Use qualified worker safety and health staff (e.g...
48 CFR 52.244-2 - Subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... certified cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other... cost or pricing data were or were not required; (D) The extent, if any, to which the Contractor did not rely on the subcontractor's certified cost or pricing data in determining the price objective and in...
LOVE CANAL MONITORING PROGRAM. GCA QA/QC (QUALITY ASSURANCE/QUALITY CONTROL) SUMMARY REPORT
One of the most important responsibilities of the Love Canal prime contractor was the institution and maintenance of a quality assurance program. An important objective of the quality assurance program was to alert the subcontractors to the importance of high quality work on thei...
Upgrading in an Industrial Setting. Final Report.
ERIC Educational Resources Information Center
Russell, Wendell
The project objectives were: (1) to assess existing industrial upgrading practices in an Atomic Energy Commission contractor organization, (2) to design new alternative upgrading methods, (3) to experiment with new upgrading methods, (4) to plan for utilization of proven upgrading programs, and (5) to document and disseminate activities. A twelve…
Code of Federal Regulations, 2010 CFR
2010-10-01
... highest tensile force which an object can withstand before breaking. Bridle means the lines connecting a... individual authorized by NMFS, or a designated contractor, to record information on marine mammal... fastened to the deck, rail, or drum, and all buoys larger than 6 inches (15.24 cm) in diameter, high flyers...
48 CFR 245.7310-2 - Performance bond.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Performance bond. 245.7310..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Sale of Surplus Contractor Inventory 245.7310-2 Performance bond. Performance bonds are required when work, other than loading, is to be performed by the...
NASA Technical Reports Server (NTRS)
Workman, Gary L
1992-01-01
Recent issues emerging in our fiscal and ecological environments have promulgated that federal agencies shall promote activities which respond to the improvement of both. In response to these developments, the National Aeronautics and Space Administration (NASA) has undertaken an innovative approach to improve the control of materials used in all NASA manufacturing activities. In concert with this goal, NASA is requiring that its contractors and their sub-contractors perform a more intensive consolidation of technologies that can provide an accounting of materials, which includes in-coming materials, materials in process, end-products and waste materials. The purpose of this handbook is to provide guidelines to NASA and its contractor personnel for the planning and implementation of chemical fingerprinting programs and to illustrate the chemical and statistical fundamentals needed for successful use of chemical fingerprinting.
Space plasma contractor research, 1988
NASA Technical Reports Server (NTRS)
Williams, John D.; Wilbur, Paul J.
1989-01-01
Results of experiments conducted on hollow cathode-based plasma contractors are reported. Specific tests in which attempts were made to vary plasma conditions in the simulated ionospheric plasma are described. Experimental results showing the effects of contractor flowrate and ion collecting surface size on contactor performance and contactor plasma plume geometry are presented. In addition to this work, one-dimensional solutions to spherical and cylindircal space-charge limited double-sheath problems are developed. A technique is proposed that can be used to apply these solutions to the problem of current flow through elongated double-sheaths that separate two cold plasmas. Two conference papers which describe the essential features of the plasma contacting process and present data that should facilitate calibration of comprehensive numerical models of the plasma contacting process are also included.
48 CFR 1352.271-76 - Performance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Performance. 1352.271-76... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-76 Performance. As prescribed in 48 CFR 1371.107, insert the following clause: Performance (APR 2010) (a) The contractor shall...
48 CFR 215.404-71-2 - Performance risk.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...
48 CFR 1352.271-76 - Performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance. 1352.271-76... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-76 Performance. As prescribed in 48 CFR 1371.107, insert the following clause: Performance (APR 2010) (a) The contractor shall...
48 CFR 1352.271-76 - Performance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Performance. 1352.271-76... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-76 Performance. As prescribed in 48 CFR 1371.107, insert the following clause: Performance (APR 2010) (a) The contractor shall...
48 CFR 1352.271-76 - Performance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Performance. 1352.271-76... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-76 Performance. As prescribed in 48 CFR 1371.107, insert the following clause: Performance (APR 2010) (a) The contractor shall...
48 CFR 215.404-71-2 - Performance risk.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...
48 CFR 215.404-71-2 - Performance risk.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...
48 CFR 1352.271-76 - Performance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Performance. 1352.271-76... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-76 Performance. As prescribed in 48 CFR 1371.107, insert the following clause: Performance (APR 2010) (a) The contractor shall...
Percentage compensation arrangements: suspect, but not illegal.
Fedor, F P
2001-01-01
Percentage compensation arrangements, in which a service is outsourced to a contractor that is paid in accordance with the level of its performance, are widely used in many business sectors. The HHS Office of Inspector General (OIG) has shown concern that these arrangements in the healthcare industry may offer incentives for the performance of unnecessary services or cause false claims to be made to Federal healthcare programs in violation of the antikickback statute and the False Claims Act. Percentage compensation arrangements can work and need not run afoul of the law as long as the healthcare organization carefully oversees the arrangement and sets specific safeguards in place. These safeguards include screening contractors, carefully evaluating their compliance programs, and obligating them contractually to perform within the limits of the law.
Controlled Enhancemnt of Long-Term Memory by Modulating Neuronal miRNA Function
2012-09-20
Faraday Ave. Carlsbad CA 92008 Prepare antisense oligonucleotides 8/1/2007 12:00:00AM 2/1/2009 12:00:00AM Sub Contractor Numbers (c): Patent Clause...with ampakines. However, ampakines that accomplish positive modulation have shown undesired clinical side effects . Another approach is to improve...of times that a mouse touches objects introduced into the cage in a fixed period of time. Objects are either “old” (prior exposure) or “new” (not
48 CFR 2842.1503 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Procedures. 2842.1503 Section 2842.1503 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Contract Management CONTRACT ADMINISTRATION Contractor Performance Information 2842.1503 Procedures. Past performance...
Thoughts on Earned Value Assessments
NASA Technical Reports Server (NTRS)
Pido, Kelle
2009-01-01
This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,
2009-07-28
Incidents of Weapons Discharges by Private Security Contractors Can Be Improved 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...for Iraq Reconstruction,400 Army Navy Drive,Arlington,VA,22202-4704 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S...Defense’s (DoD) oversight of incidents involving the firing—or discharge —of weapons reported from May 2008 through February 2009 by its PSCs
NASA Technical Reports Server (NTRS)
1990-01-01
The NASA Excellence Award for Productivity and Quality is the result of NASA's desire to encourage superior quality and the continuous improvement philosophy in the aerospace industry. It is awarded to NASA contractors, subcontractors, and suppliers who have demonstrated sustained excellence, customer orientation, and outstanding achievements in a total quality management (TQM) environment. The 'highlights' booklet is intended to transfer successful techniques demonstrated by the performance and quality of major NASA contractors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... personnel performing private security functions in designated areas are addressed in Department of Defense... contract is for the performance of private security functions or other supplies or services. (c) DoD... of the contractor who are responsible for performing private security functions comply with orders...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Contractor Employees Performing Acquisition Functions 3.1103 Procedures. (a) By use of the contract clause at... employees perform acquisition functions closely associated with inherently Government functions to— (1) Have... information accessed through performance of a Government contract for personal gain; and (iii) Obtain a signed...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Contractor Employees Performing Acquisition Functions 3.1103 Procedures. (a) By use of the contract clause at... employees perform acquisition functions closely associated with inherently Government functions to— (1) Have... information accessed through performance of a Government contract for personal gain; and (iii) Obtain a signed...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Contractor Employees Performing Acquisition Functions 3.1103 Procedures. (a) By use of the contract clause at... employees perform acquisition functions closely associated with inherently Government functions to— (1) Have... information accessed through performance of a Government contract for personal gain; and (iii) Obtain a signed...
48 CFR 9.104-6 - Federal Awardee Performance and Integrity Information System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Performance and Integrity Information System. 9.104-6 Section 9.104-6 Federal Acquisition Regulations System... Contractors 9.104-6 Federal Awardee Performance and Integrity Information System. (a) Before awarding a... Federal Awardee Performance and Integrity Information System (FAPIIS), (available at www.ppirs.gov, then...
48 CFR 9.104-6 - Federal Awardee Performance and Integrity Information System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Performance and Integrity Information System. 9.104-6 Section 9.104-6 Federal Acquisition Regulations System... Contractors 9.104-6 Federal Awardee Performance and Integrity Information System. (a) Before awarding a... Federal Awardee Performance and Integrity Information System (FAPIIS), (available at www.ppirs.gov, then...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 742.1170-3 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-3 Policy. (a) The contractor is responsible for timely contract performance. Performance monitoring by USAID does not obviate...
48 CFR 47.207-5 - Contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
48 CFR 3452.224-70 - Release of information under the Freedom of Information Act.
Code of Federal Regulations, 2014 CFR
2014-10-01
...: (1) Unit prices, including labor rates; (2) Statements of Work/Performance Work Statements generated by the contractor; (3) Performance requirements, including incentives, performance standards, quality levels, and service level agreements; (4) Reports, deliverables, and work products delivered in...
48 CFR 3452.224-70 - Release of information under the Freedom of Information Act.
Code of Federal Regulations, 2012 CFR
2012-10-01
...: (1) Unit prices, including labor rates; (2) Statements of Work/Performance Work Statements generated by the contractor; (3) Performance requirements, including incentives, performance standards, quality levels, and service level agreements; (4) Reports, deliverables, and work products delivered in...
48 CFR 3452.224-70 - Release of information under the Freedom of Information Act.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: (1) Unit prices, including labor rates; (2) Statements of Work/Performance Work Statements generated by the contractor; (3) Performance requirements, including incentives, performance standards, quality levels, and service level agreements; (4) Reports, deliverables, and work products delivered in...
48 CFR 1845.502-70 - Contractor-acquired property.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...
48 CFR 35.015 - Contracts for research with educational institutions and nonprofit organizations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... management capabilities, and (B) the contractor's estimate of the amount of time that individual will devote... obtain the contracting officer's approval to change the phenomenon under study, the stated objectives of... and approval over the avenues of approach, methods, or schedule of work. (b) Basic agreements. (1) A...
48 CFR 35.015 - Contracts for research with educational institutions and nonprofit organizations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... management capabilities, and (B) the contractor's estimate of the amount of time that individual will devote... obtain the contracting officer's approval to change the phenomenon under study, the stated objectives of... and approval over the avenues of approach, methods, or schedule of work. (b) Basic agreements. (1) A...
The Management of Building Environment for Comfort and Energy Conservation. Final Report.
ERIC Educational Resources Information Center
North Seattle Community Coll., WA.
This report presents materials from a Washington State project to develop a curriculum outline of three courses for energy conservation to be used in vocational supplement classes. It first presents results from an industrial survey on which engineers, architects, and mechanical contractors rated objectives for the three courses. Next are provided…
Negotiation, Administration, and Measurement of Food Service Contracts in Higher Education.
ERIC Educational Resources Information Center
Scott, H. Donald
1973-01-01
The process of establishing and maintaining relations with a contract feeder is reviewed. Initial contact, reasons for the contact, contract negotiation, key people involved, and the ultimate tools of measurement are mentioned. Possible goals and objectives to be specified to a negotiating contractor are suggested. Items to be covered in the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army.more » After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses an area of approximately 15,546 acres. The primary mission of LSAAP is to load, assemble and pack ammunition and ammunition components for the Army.« less
NASA Technical Reports Server (NTRS)
Staigner, P. J.; Abbott, J. M.
1980-01-01
Two parallel contracted studies were conducted. Each contractor investigated three base cases and parametric variations about these base cases. Each contractor concluded that two of the base cases (a plant using separate firing of an advanced high temperature regenerative air heater with fuel from an advanced coal gasifier and a plant using an intermediate temperature metallic recuperative heat exchanger to heat oxygen enriched combustion air) were comparable in both performance and cost of electricity. The contractors differed in the level of their cost estimates with the capital cost estimates for the MHD topping cycle and the magnet subsystem in particular accounting for a significant part of the difference. The impact of the study on the decision to pursue a course which leads to an oxygen enriched plant as the first commercial MHD plant is described.
48 CFR 18.102 - Central contractor registration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...
Scientific-Technical and Business Careers Training Grant
NASA Technical Reports Server (NTRS)
Conway, Mary P.
2001-01-01
The 1996 renewal of the NGT2-1001 grant included three objectives and expected outcomes. The information highlights the results and progress to address the grant objectives and outcomes for the time period of July 1, 2000 through June 30, 2001. Objective Number One indicated that the internship staff would annually recruit and place at least 90 community college students in internship positions related to their college majors. Internship enrollments for the summer, fall, winter and spring quarters of 2000-2001 show an average enrollment of 121 students per quarter. This number includes (13) interns sponsored by Ames contractors.
1997-09-01
cost . That is, a change in the cost driver will cause a change in the total cost of a related cost object. ( Horngren , et al., 1994) Cost Object...Anything for which a separate measurement of costs is desired. ( Horngren , et al., 1994) 48 Fixed Cost Cost that does not change in total despite changes...in a cost driver. ( Horngren , et al., 1994) Incremental Cost The difference in total cost between two alternatives. Also called
1991-12-01
abstract data type is, what an object-oriented design is and how to apply "software engineering" principles to the design of both of them. I owe a great... Program (ASVP), a research and development effort by two aerospace contractors to redesign and implement subsets of two existing flight simulators in...effort addresses how to implement a simulator designed using the SEI OOD Paradigm on a distributed, parallel, multiple instruction, multiple data (MIMD
48 CFR 2427.305-2 - Follow-up by contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...