Sample records for objectives budget schedule

  1. VM Capacity-Aware Scheduling within Budget Constraints in IaaS Clouds

    PubMed Central

    Thanasias, Vasileios; Lee, Choonhwa; Hanif, Muhammad; Kim, Eunsam; Helal, Sumi

    2016-01-01

    Recently, cloud computing has drawn significant attention from both industry and academia, bringing unprecedented changes to computing and information technology. The infrastructure-as-a-Service (IaaS) model offers new abilities such as the elastic provisioning and relinquishing of computing resources in response to workload fluctuations. However, because the demand for resources dynamically changes over time, the provisioning of resources in a way that a given budget is efficiently utilized while maintaining a sufficing performance remains a key challenge. This paper addresses the problem of task scheduling and resource provisioning for a set of tasks running on IaaS clouds; it presents novel provisioning and scheduling algorithms capable of executing tasks within a given budget, while minimizing the slowdown due to the budget constraint. Our simulation study demonstrates a substantial reduction up to 70% in the overall task slowdown rate by the proposed algorithms. PMID:27501046

  2. VM Capacity-Aware Scheduling within Budget Constraints in IaaS Clouds.

    PubMed

    Thanasias, Vasileios; Lee, Choonhwa; Hanif, Muhammad; Kim, Eunsam; Helal, Sumi

    2016-01-01

    Recently, cloud computing has drawn significant attention from both industry and academia, bringing unprecedented changes to computing and information technology. The infrastructure-as-a-Service (IaaS) model offers new abilities such as the elastic provisioning and relinquishing of computing resources in response to workload fluctuations. However, because the demand for resources dynamically changes over time, the provisioning of resources in a way that a given budget is efficiently utilized while maintaining a sufficing performance remains a key challenge. This paper addresses the problem of task scheduling and resource provisioning for a set of tasks running on IaaS clouds; it presents novel provisioning and scheduling algorithms capable of executing tasks within a given budget, while minimizing the slowdown due to the budget constraint. Our simulation study demonstrates a substantial reduction up to 70% in the overall task slowdown rate by the proposed algorithms.

  3. Budget impact analysis of vaccination against Haemophilus influenzae type b as a part of a Pentavalent vaccine in the childhood immunization schedule of Iran.

    PubMed

    Teimouri, Fatemeh; Kebriaeezadeh, Abbas; Zahraei, Seyed Mohsen; Gheiratian, MohammadMahdi; Nikfar, Shekoufeh

    2017-01-14

    Health decision makers need to know the impact of the development of a new intervention on the public health and health care costs so that they can plan for economic and financial objectives. The aim of this study was to determine the budget impact of adding Haemophilus influenzae type b (Hib) as a part of a Pentavalent vaccine (Hib-HBV-DTP) to the national childhood immunization schedule of Iran. An excel-based model was developed to determine the costs of including the Pentavalent vaccine in the national immunization program (NIP), comparing the present schedule with the previous one (including separate DTP and hepatitis B vaccines). The total annual costs included the cost of vaccination (the vaccine and syringe) and the cost of Hib treatment. The health outcome was the estimated annual cases of the diseases. The net budget impact was the difference in the total annual cost between the two schedules. Uncertainty about the vaccine effectiveness, vaccination coverage, cost of the vaccine, and cost of the diseases were handled through scenario analysis. The total cost of vaccination during 5 years was $18,060,463 in the previous program and $67,774,786 in the present program. Inclusion of the Pentavalent vaccine would increase the vaccination cost about $49 million, but would save approximately $6 million in the healthcare costs due to reduction of disease cases and treatment costs. The introduction of the Pentavalent vaccine resulted in a net increase in the healthcare budget expenditure across all scenarios from $43.4 million to $50.7 million. The results of this study showed that the inclusion of the Pentavalent vaccine in the NIP of Iran had a significant impact on the health care budget and increased the financial burden on the government. Budget impact of including Pentavalent vaccine in the national immunization schedule of Iranᅟ.

  4. Improved NSGA model for multi objective operation scheduling and its evaluation

    NASA Astrophysics Data System (ADS)

    Li, Weining; Wang, Fuyu

    2017-09-01

    Reasonable operation can increase the income of the hospital and improve the patient’s satisfactory level. In this paper, by using multi object operation scheduling method with improved NSGA algorithm, it shortens the operation time, reduces the operation costand lowers the operation risk, the multi-objective optimization model is established for flexible operation scheduling, through the MATLAB simulation method, the Pareto solution is obtained, the standardization of data processing. The optimal scheduling scheme is selected by using entropy weight -Topsis combination method. The results show that the algorithm is feasible to solve the multi-objective operation scheduling problem, and provide a reference for hospital operation scheduling.

  5. Scheduling for the National Hockey League Using a Multi-objective Evolutionary Algorithm

    NASA Astrophysics Data System (ADS)

    Craig, Sam; While, Lyndon; Barone, Luigi

    We describe a multi-objective evolutionary algorithm that derives schedules for the National Hockey League according to three objectives: minimising the teams' total travel, promoting equity in rest time between games, and minimising long streaks of home or away games. Experiments show that the system is able to derive schedules that beat the 2008-9 NHL schedule in all objectives simultaneously, and that it returns a set of schedules that offer a range of trade-offs across the objectives.

  6. Scheduler for monitoring objects orbiting earth using satellite-based telescopes

    DOEpatents

    Olivier, Scot S; Pertica, Alexander J; Riot, Vincent J; De Vries, Willem H; Bauman, Brian J; Nikolaev, Sergei; Henderson, John R; Phillion, Donald W

    2015-04-28

    An ephemeris refinement system includes satellites with imaging devices in earth orbit to make observations of space-based objects ("target objects") and a ground-based controller that controls the scheduling of the satellites to make the observations of the target objects and refines orbital models of the target objects. The ground-based controller determines when the target objects of interest will be near enough to a satellite for that satellite to collect an image of the target object based on an initial orbital model for the target objects. The ground-based controller directs the schedules to be uploaded to the satellites, and the satellites make observations as scheduled and download the observations to the ground-based controller. The ground-based controller then refines the initial orbital models of the target objects based on the locations of the target objects that are derived from the observations.

  7. Multi-Objective Scheduling for the Cluster II Constellation

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Giuliano, Mark

    2011-01-01

    This paper describes the application of the MUSE multiobjecctive scheduling framework to the Cluster II WBD scheduling domain. Cluster II is an ESA four-spacecraft constellation designed to study the plasma environment of the Earth and it's magnetosphere. One of the instruments on each of the four spacecraft is the Wide Band Data (WBD) plasma wave experiment. We have applied the MUSE evolutionary algorithm to the scheduling problem represented by this instrument, and the result has been adopted and utilized by the WBD schedulers for nearly a year. This paper describes the WBD scheduling problem, its representation in MUSE, and some of the visualization elements that provide insight into objective value tradeoffs.

  8. Short-term scheduling of an open-pit mine with multiple objectives

    NASA Astrophysics Data System (ADS)

    Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.

    2017-05-01

    This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.

  9. Experiments with a Parallel Multi-Objective Evolutionary Algorithm for Scheduling

    NASA Technical Reports Server (NTRS)

    Brown, Matthew; Johnston, Mark D.

    2013-01-01

    Evolutionary multi-objective algorithms have great potential for scheduling in those situations where tradeoffs among competing objectives represent a key requirement. One challenge, however, is runtime performance, as a consequence of evolving not just a single schedule, but an entire population, while attempting to sample the Pareto frontier as accurately and uniformly as possible. The growing availability of multi-core processors in end user workstations, and even laptops, has raised the question of the extent to which such hardware can be used to speed up evolutionary algorithms. In this paper we report on early experiments in parallelizing a Generalized Differential Evolution (GDE) algorithm for scheduling long-range activities on NASA's Deep Space Network. Initial results show that significant speedups can be achieved, but that performance does not necessarily improve as more cores are utilized. We describe our preliminary results and some initial suggestions from parallelizing the GDE algorithm. Directions for future work are outlined.

  10. Multiagent scheduling method with earliness and tardiness objectives in flexible job shops.

    PubMed

    Wu, Zuobao; Weng, Michael X

    2005-04-01

    Flexible job-shop scheduling problems are an important extension of the classical job-shop scheduling problems and present additional complexity. Such problems are mainly due to the existence of a considerable amount of overlapping capacities with modern machines. Classical scheduling methods are generally incapable of addressing such capacity overlapping. We propose a multiagent scheduling method with job earliness and tardiness objectives in a flexible job-shop environment. The earliness and tardiness objectives are consistent with the just-in-time production philosophy which has attracted significant attention in both industry and academic community. A new job-routing and sequencing mechanism is proposed. In this mechanism, two kinds of jobs are defined to distinguish jobs with one operation left from jobs with more than one operation left. Different criteria are proposed to route these two kinds of jobs. Job sequencing enables to hold a job that may be completed too early. Two heuristic algorithms for job sequencing are developed to deal with these two kinds of jobs. The computational experiments show that the proposed multiagent scheduling method significantly outperforms the existing scheduling methods in the literature. In addition, the proposed method is quite fast. In fact, the simulation time to find a complete schedule with over 2000 jobs on ten machines is less than 1.5 min.

  11. 14 CFR 323.9 - Objections to notices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... DOT action requested. (3) The schedules, routes, carriers, and aircraft types for all air... include in their objections facts to support the suggested level of essential air service (e.g., traffic... on air transportation). (Approved by the Office of Management and Budget under control number 3024...

  12. 14 CFR 323.9 - Objections to notices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DOT action requested. (3) The schedules, routes, carriers, and aircraft types for all air... include in their objections facts to support the suggested level of essential air service (e.g., traffic... on air transportation). (Approved by the Office of Management and Budget under control number 3024...

  13. Multi-Objective Approach for Energy-Aware Workflow Scheduling in Cloud Computing Environments

    PubMed Central

    Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach. PMID:24319361

  14. Multi-objective approach for energy-aware workflow scheduling in cloud computing environments.

    PubMed

    Yassa, Sonia; Chelouah, Rachid; Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach.

  15. Permutation flow-shop scheduling problem to optimize a quadratic objective function

    NASA Astrophysics Data System (ADS)

    Ren, Tao; Zhao, Peng; Zhang, Da; Liu, Bingqian; Yuan, Huawei; Bai, Danyu

    2017-09-01

    A flow-shop scheduling model enables appropriate sequencing for each job and for processing on a set of machines in compliance with identical processing orders. The objective is to achieve a feasible schedule for optimizing a given criterion. Permutation is a special setting of the model in which the processing order of the jobs on the machines is identical for each subsequent step of processing. This article addresses the permutation flow-shop scheduling problem to minimize the criterion of total weighted quadratic completion time. With a probability hypothesis, the asymptotic optimality of the weighted shortest processing time schedule under a consistency condition (WSPT-CC) is proven for sufficiently large-scale problems. However, the worst case performance ratio of the WSPT-CC schedule is the square of the number of machines in certain situations. A discrete differential evolution algorithm, where a new crossover method with multiple-point insertion is used to improve the final outcome, is presented to obtain high-quality solutions for moderate-scale problems. A sequence-independent lower bound is designed for pruning in a branch-and-bound algorithm for small-scale problems. A set of random experiments demonstrates the performance of the lower bound and the effectiveness of the proposed algorithms.

  16. Multi-objective generation scheduling with hybrid energy resources

    NASA Astrophysics Data System (ADS)

    Trivedi, Manas

    In economic dispatch (ED) of electric power generation, the committed generating units are scheduled to meet the load demand at minimum operating cost with satisfying all unit and system equality and inequality constraints. Generation of electricity from the fossil fuel releases several contaminants into the atmosphere. So the economic dispatch objective can no longer be considered alone due to the environmental concerns that arise from the emissions produced by fossil fueled electric power plants. This research is proposing the concept of environmental/economic generation scheduling with traditional and renewable energy sources. Environmental/economic dispatch (EED) is a multi-objective problem with conflicting objectives since emission minimization is conflicting with fuel cost minimization. Production and consumption of fossil fuel and nuclear energy are closely related to environmental degradation. This causes negative effects to human health and the quality of life. Depletion of the fossil fuel resources will also be challenging for the presently employed energy systems to cope with future energy requirements. On the other hand, renewable energy sources such as hydro and wind are abundant, inexhaustible and widely available. These sources use native resources and have the capacity to meet the present and the future energy demands of the world with almost nil emissions of air pollutants and greenhouse gases. The costs of fossil fuel and renewable energy are also heading in opposite directions. The economic policies needed to support the widespread and sustainable markets for renewable energy sources are rapidly evolving. The contribution of this research centers on solving the economic dispatch problem of a system with hybrid energy resources under environmental restrictions. It suggests an effective solution of renewable energy to the existing fossil fueled and nuclear electric utilities for the cheaper and cleaner production of electricity with hourly

  17. Budgeting by Objectives--How Goals and Objectives, Operational Activities, and Resource Allocation Are Integrated in a Planning System. AIR 1984 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Capoor, Madan

    The Objective-Based Assessment, Planning, and Resource Allocation System (OAPRAS) that was developed and implemented at Middlesex County College is described. The integrated self-assessment planning and budgeting system was developed in 1981. The central purpose of OAPRAS was to link resource allocation decisions to the prioritized objectives that…

  18. Optimal infrastructure maintenance scheduling problem under budget uncertainty.

    DOT National Transportation Integrated Search

    2010-05-01

    This research addresses a general class of infrastructure asset management problems. Infrastructure : agencies usually face budget uncertainties that will eventually lead to suboptimal planning if : maintenance decisions are made without taking the u...

  19. Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm

    NASA Astrophysics Data System (ADS)

    Ausaf, Muhammad Farhan; Gao, Liang; Li, Xinyu

    2015-12-01

    For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

  20. A Hybrid Cellular Genetic Algorithm for Multi-objective Crew Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Jolai, Fariborz; Assadipour, Ghazal

    Crew scheduling is one of the important problems of the airline industry. This problem aims to cover a number of flights by crew members, such that all the flights are covered. In a robust scheduling the assignment should be so that the total cost, delays, and unbalanced utilization are minimized. As the problem is NP-hard and the objectives are in conflict with each other, a multi-objective meta-heuristic called CellDE, which is a hybrid cellular genetic algorithm, is implemented as the optimization method. The proposed algorithm provides the decision maker with a set of non-dominated or Pareto-optimal solutions, and enables them to choose the best one according to their preferences. A set of problems of different sizes is generated and solved using the proposed algorithm. Evaluating the performance of the proposed algorithm, three metrics are suggested, and the diversity and the convergence of the achieved Pareto front are appraised. Finally a comparison is made between CellDE and PAES, another meta-heuristic algorithm. The results show the superiority of CellDE.

  1. Large project experiences with object-oriented methods and reuse

    NASA Technical Reports Server (NTRS)

    Wessale, William; Reifer, Donald J.; Weller, David

    1992-01-01

    The SSVTF (Space Station Verification and Training Facility) project is completing the Preliminary Design Review of a large software development using object-oriented methods and systematic reuse. An incremental developmental lifecycle was tailored to provide early feedback and guidance on methods and products, with repeated attention to reuse. Object oriented methods were formally taught and supported by realistic examples. Reuse was readily accepted and planned by the developers. Schedule and budget issues were handled by agreements and work sharing arranged by the developers.

  2. Discrete particle swarm optimization to solve multi-objective limited-wait hybrid flow shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Santosa, B.; Siswanto, N.; Fiqihesa

    2018-04-01

    This paper proposes a discrete Particle Swam Optimization (PSO) to solve limited-wait hybrid flowshop scheduing problem with multi objectives. Flow shop schedulimg represents the condition when several machines are arranged in series and each job must be processed at each machine with same sequence. The objective functions are minimizing completion time (makespan), total tardiness time, and total machine idle time. Flow shop scheduling model always grows to cope with the real production system accurately. Since flow shop scheduling is a NP-Hard problem then the most suitable method to solve is metaheuristics. One of metaheuristics algorithm is Particle Swarm Optimization (PSO), an algorithm which is based on the behavior of a swarm. Originally, PSO was intended to solve continuous optimization problems. Since flow shop scheduling is a discrete optimization problem, then, we need to modify PSO to fit the problem. The modification is done by using probability transition matrix mechanism. While to handle multi objectives problem, we use Pareto Optimal (MPSO). The results of MPSO is better than the PSO because the MPSO solution set produced higher probability to find the optimal solution. Besides the MPSO solution set is closer to the optimal solution

  3. Multi-objective group scheduling optimization integrated with preventive maintenance

    NASA Astrophysics Data System (ADS)

    Liao, Wenzhu; Zhang, Xiufang; Jiang, Min

    2017-11-01

    This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.

  4. Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization.

    PubMed

    Mousavi, Maryam; Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah

    2017-01-01

    Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs' battery charge. Assessment of the numerical examples' scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software.

  5. Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization

    PubMed Central

    Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah

    2017-01-01

    Flexible manufacturing system (FMS) enhances the firm’s flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs’ battery charge. Assessment of the numerical examples’ scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software. PMID:28263994

  6. Plan Your Advertising Budget.

    ERIC Educational Resources Information Center

    Britt, Steuart-Henderson

    1979-01-01

    Methods for establishing an advertising budget are reviewed. They include methods based on percentage of sales or profits, unit of sales, and objective and task. Also discussed are ways to allocate a promotional budget. The most common breakdowns are: departmental budgets, total budget, calendar periods, media, and sales area. (JMD)

  7. Constrained non-linear multi-objective optimisation of preventive maintenance scheduling for offshore wind farms

    NASA Astrophysics Data System (ADS)

    Zhong, Shuya; Pantelous, Athanasios A.; Beer, Michael; Zhou, Jian

    2018-05-01

    Offshore wind farm is an emerging source of renewable energy, which has been shown to have tremendous potential in recent years. In this blooming area, a key challenge is that the preventive maintenance of offshore turbines should be scheduled reasonably to satisfy the power supply without failure. In this direction, two significant goals should be considered simultaneously as a trade-off. One is to maximise the system reliability and the other is to minimise the maintenance related cost. Thus, a non-linear multi-objective programming model is proposed including two newly defined objectives with thirteen families of constraints suitable for the preventive maintenance of offshore wind farms. In order to solve our model effectively, the nondominated sorting genetic algorithm II, especially for the multi-objective optimisation is utilised and Pareto-optimal solutions of schedules can be obtained to offer adequate support to decision-makers. Finally, an example is given to illustrate the performances of the devised model and algorithm, and explore the relationships of the two targets with the help of a contrast model.

  8. Strategic Gang Scheduling for Railroad Maintenance

    DOT National Transportation Integrated Search

    2012-08-14

    We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...

  9. Solving multi-objective job shop scheduling problems using a non-dominated sorting genetic algorithm

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    The efforts of finding optimal schedules for the job shop scheduling problems are highly important for many real-world industrial applications. In this paper, a multi-objective based job shop scheduling problem by simultaneously minimizing makespan and tardiness is taken into account. The problem is considered to be more complex due to the multiple business criteria that must be satisfied. To solve the problem more efficiently and to obtain a set of non-dominated solutions, a meta-heuristic based non-dominated sorting genetic algorithm is presented. In addition, task based representation is used for solution encoding, and tournament selection that is based on rank and crowding distance is applied for offspring selection. Swapping and insertion mutations are employed to increase diversity of population and to perform intensive search. To evaluate the modified non-dominated sorting genetic algorithm, a set of modified benchmarking job shop problems obtained from the OR-Library is used, and the results are considered based on the number of non-dominated solutions and quality of schedules obtained by the algorithm.

  10. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem.

    PubMed

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods.

  11. A bi-objective integer programming model for partly-restricted flight departure scheduling

    PubMed Central

    Guan, Wei; Zhang, Wenyi; Jiang, Shixiong; Fan, Lingling

    2018-01-01

    The normal studies on air traffic departure scheduling problem (DSP) mainly deal with an independent airport in which the departure traffic is not affected by surrounded airports, which, however, is not a consistent case. In reality, there still exist cases where several commercial airports are closely located and one of them possesses a higher priority. During the peak hours, the departure activities of the lower-priority airports are usually required to give way to those of higher-priority airport. These giving-way requirements can inflict a set of changes on the modeling of departure scheduling problem with respect to the lower-priority airports. To the best of our knowledge, studies on DSP under this condition are scarce. Accordingly, this paper develops a bi-objective integer programming model to address the flight departure scheduling of the partly-restricted (e.g., lower-priority) one among several adjacent airports. An adapted tabu search algorithm is designed to solve the current problem. It is demonstrated from the case study of Tianjin Binhai International Airport in China that the proposed method can obviously improve the operation efficiency, while still realizing superior equity and regularity among restricted flows. PMID:29715299

  12. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem

    PubMed Central

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods. PMID:26176764

  13. A bi-objective integer programming model for partly-restricted flight departure scheduling.

    PubMed

    Zhong, Han; Guan, Wei; Zhang, Wenyi; Jiang, Shixiong; Fan, Lingling

    2018-01-01

    The normal studies on air traffic departure scheduling problem (DSP) mainly deal with an independent airport in which the departure traffic is not affected by surrounded airports, which, however, is not a consistent case. In reality, there still exist cases where several commercial airports are closely located and one of them possesses a higher priority. During the peak hours, the departure activities of the lower-priority airports are usually required to give way to those of higher-priority airport. These giving-way requirements can inflict a set of changes on the modeling of departure scheduling problem with respect to the lower-priority airports. To the best of our knowledge, studies on DSP under this condition are scarce. Accordingly, this paper develops a bi-objective integer programming model to address the flight departure scheduling of the partly-restricted (e.g., lower-priority) one among several adjacent airports. An adapted tabu search algorithm is designed to solve the current problem. It is demonstrated from the case study of Tianjin Binhai International Airport in China that the proposed method can obviously improve the operation efficiency, while still realizing superior equity and regularity among restricted flows.

  14. Multi-objective flexible job shop scheduling problem using variable neighborhood evolutionary algorithm

    NASA Astrophysics Data System (ADS)

    Wang, Chun; Ji, Zhicheng; Wang, Yan

    2017-07-01

    In this paper, multi-objective flexible job shop scheduling problem (MOFJSP) was studied with the objects to minimize makespan, total workload and critical workload. A variable neighborhood evolutionary algorithm (VNEA) was proposed to obtain a set of Pareto optimal solutions. First, two novel crowded operators in terms of the decision space and object space were proposed, and they were respectively used in mating selection and environmental selection. Then, two well-designed neighborhood structures were used in local search, which consider the problem characteristics and can hold fast convergence. Finally, extensive comparison was carried out with the state-of-the-art methods specially presented for solving MOFJSP on well-known benchmark instances. The results show that the proposed VNEA is more effective than other algorithms in solving MOFJSP.

  15. A derived heuristics based multi-objective optimization procedure for micro-grid scheduling

    NASA Astrophysics Data System (ADS)

    Li, Xin; Deb, Kalyanmoy; Fang, Yanjun

    2017-06-01

    With the availability of different types of power generators to be used in an electric micro-grid system, their operation scheduling as the load demand changes with time becomes an important task. Besides satisfying load balance constraints and the generator's rated power, several other practicalities, such as limited availability of grid power and restricted ramping of power output from generators, must all be considered during the operation scheduling process, which makes it difficult to decide whether the optimization results are accurate and satisfactory. In solving such complex practical problems, heuristics-based customized optimization algorithms are suggested. However, due to nonlinear and complex interactions of variables, it is difficult to come up with heuristics in such problems off-hand. In this article, a two-step strategy is proposed in which the first task deciphers important heuristics about the problem and the second task utilizes the derived heuristics to solve the original problem in a computationally fast manner. Specifically, the specific operation scheduling is considered from a two-objective (cost and emission) point of view. The first task develops basic and advanced level knowledge bases offline from a series of prior demand-wise optimization runs and then the second task utilizes them to modify optimized solutions in an application scenario. Results on island and grid connected modes and several pragmatic formulations of the micro-grid operation scheduling problem clearly indicate the merit of the proposed two-step procedure.

  16. The High Energy Solar Physics mission (HESP): Scientific objectives and technical description

    NASA Technical Reports Server (NTRS)

    Crannell, Carol; Dennis, Brian; Davis, John; Emslie, Gordon; Haerendel, Gerhard; Hudson, High; Hurford, Gordon; Lin, Robert; Ling, James; Pick, Monique

    1991-01-01

    The High Energy Solar Physics mission offers the opportunity for major breakthroughs in the understanding of the fundamental energy release and particle acceleration processes at the core of the solar flare problem. The following subject areas are covered: the scientific objectives of HESP; what we can expect from the HESP observations; the high energy imaging spectrometer (HEISPEC); the HESP spacecraft; and budget and schedule.

  17. Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization.

    PubMed

    Yu, Yang; Wang, Sihan; Tang, Jiafu; Kaku, Ikou; Sun, Wei

    2016-01-01

    Productivity can be greatly improved by converting the traditional assembly line to a seru system, especially in the business environment with short product life cycles, uncertain product types and fluctuating production volumes. Line-seru conversion includes two decision processes, i.e., seru formation and seru load. For simplicity, however, previous studies focus on the seru formation with a given scheduling rule in seru load. We select ten scheduling rules usually used in seru load to investigate the influence of different scheduling rules on the performance of line-seru conversion. Moreover, we clarify the complexities of line-seru conversion for ten different scheduling rules from the theoretical perspective. In addition, multi-objective decisions are often used in line-seru conversion. To obtain Pareto-optimal solutions of multi-objective line-seru conversion, we develop two improved exact algorithms based on reducing time complexity and space complexity respectively. Compared with the enumeration based on non-dominated sorting to solve multi-objective problem, the two improved exact algorithms saves computation time greatly. Several numerical simulation experiments are performed to show the performance improvement brought by the two proposed exact algorithms.

  18. Budget process bottlenecks for immunization financing in the Democratic Republic of the Congo (DRC).

    PubMed

    Le Gargasson, Jean-Bernard; Mibulumukini, Benoît; Gessner, Bradford D; Colombini, Anaïs

    2014-02-19

    In Democratic Republic of the Congo (DRC), the availability of domestic resources for the immunization program is limited and relies mostly on external donor support. DRC has introduced a series of reforms to move the country toward performance-based management and program budgets. The objectives of the study were to: (i) describe the budget process norm, (ii) analyze the budget process in practice and associated bottlenecks at each of its phases, and (iii) collect suggestions made by the actors involved to improve the situation. Quantitative and qualitative data were collected through: a review of published and gray literature, and individual interviews. Bottlenecks in the budget process and disbursement of funds for immunization are one of the causes of limited domestic resources for the program. Critical bottlenecks include: excessive use of off-budget procedures; limited human resources and capacity; lack of motivation; interference from ministries with the standard budget process; dependency toward the development partner's disbursements schedule; and lack of budget implementation tracking. Results show that the health sector's mobilization rate was 59% in 2011. For the credit line specific to immunization program activities, the mobilization rate for the national Expanded Program for Immunization (EPI) was 26% in 2011 and 43% for vaccines (2010). The main bottleneck for the EPI budget line (2011) and vaccine budget line (2011) occurs at the authorization phase. Budget process bottlenecks identified in the analysis lead to a low mobilization rate for the immunization program. The bottlenecks identified show that a poor flow of funds causes an insufficient percentage of already allocated resources to reach various health system levels. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Responsibility-Centred Budgeting: An Emerging Trend in Higher Education Budget Reform

    ERIC Educational Resources Information Center

    Zierdt, Ginger LuAnne

    2009-01-01

    Higher education institutions in the United States are entering a new era in budgeting. Therefore, institutions are actively engaging in dialogues about the budgeting tools that will most effectively assist them in achieving institutional goals and objectives within their strategic plans and being accountable for the use of scarce resources, as…

  20. Environment-Aware Production Scheduling for Paint Shops in Automobile Manufacturing: A Multi-Objective Optimization Approach

    PubMed Central

    Zhang, Rui

    2017-01-01

    The traditional way of scheduling production processes often focuses on profit-driven goals (such as cycle time or material cost) while tending to overlook the negative impacts of manufacturing activities on the environment in the form of carbon emissions and other undesirable by-products. To bridge the gap, this paper investigates an environment-aware production scheduling problem that arises from a typical paint shop in the automobile manufacturing industry. In the studied problem, an objective function is defined to minimize the emission of chemical pollutants caused by the cleaning of painting devices which must be performed each time before a color change occurs. Meanwhile, minimization of due date violations in the downstream assembly shop is also considered because the two shops are interrelated and connected by a limited-capacity buffer. First, we have developed a mixed-integer programming formulation to describe this bi-objective optimization problem. Then, to solve problems of practical size, we have proposed a novel multi-objective particle swarm optimization (MOPSO) algorithm characterized by problem-specific improvement strategies. A branch-and-bound algorithm is designed for accurately assessing the most promising solutions. Finally, extensive computational experiments have shown that the proposed MOPSO is able to match the solution quality of an exact solver on small instances and outperform two state-of-the-art multi-objective optimizers in literature on large instances with up to 200 cars. PMID:29295603

  1. Budgeting in Nonprofit Organizations.

    ERIC Educational Resources Information Center

    Kelly, Lauren

    1985-01-01

    This description of the role of budgets in nonprofit organizations uses libraries as an example. Four types of budgets--legislative, management, cash, and capital--are critiqued in terms of cost effectiveness, implementation, and facilitation of organizational control and objectives. (CLB)

  2. Using C to build a satellite scheduling expert system: Examples from the Explorer Platform planning system

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Tuchman, Alan; Potter, William J.

    1991-01-01

    A C-based artificial intelligence (AI) development effort which is based on a software tools approach is discussed with emphasis on reusability and maintainability of code. The discussion starts with simple examples of how list processing can easily be implemented in C and then proceeds to the implementations of frames and objects which use dynamic memory allocation. The implementation of procedures which use depth first search, constraint propagation, context switching, and blackboard-like simulation environment are described. Techniques for managing the complexity of C-based AI software are noted, especially the object-oriented techniques of data encapsulation and incremental development. Finally, all these concepts are put together by describing the components of planning software called the Planning And Resource Reasoning (PARR) Shell. This shell was successfully utilized for scheduling services of the Tracking and Data Relay Satellite System for the Earth Radiation Budget Satellite since May of 1987 and will be used for operations scheduling of the Explorer Platform in Nov. of 1991.

  3. Developing integrated parametric planning models for budgeting and managing complex projects

    NASA Technical Reports Server (NTRS)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  4. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  5. Budgeting in Higher Education (Teaching Module).

    ERIC Educational Resources Information Center

    Emery, Rebecca A.

    A teaching module or student-oriented learning outline on budgeting in higher education is presented. The module is designed for either group or individual student use and is specifically for the study of higher education. Objectives of the unit are as follows: define "budget," list and describe several types of budgets, cite the three phases of…

  6. Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hulett, David T.; Nosbisch, Michael R.

    proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course

  7. Strategic plan creates a blueprint for budgeting.

    PubMed

    Cook, D

    1990-05-01

    Effective healthcare organizations develop budgets that reflect and support a strategic plan. Senior managers set a framework that expresses the hospital's future strategic objectives. The budget enables executives to determine which specific service lines are profitable or unprofitable. Administrators and clinicians at all levels are involved in the budgeting process.

  8. 77 FR 37443 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... process is available on request. Schedules Pending 1. Department of Defense, Defense Threat Reduction... for budget planning, financial forecasting, and related functions. 2. Department of Defense, Defense..., after a specified period, of records lacking administrative, legal, research, or other value. Notice is...

  9. XOPPS - OEL PROJECT PLANNER/SCHEDULER TOOL

    NASA Technical Reports Server (NTRS)

    Mulnix, C. L.

    1994-01-01

    XOPPS is a window-based graphics tool for scheduling and project planning that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays the full image of the schedule being edited. The canvas contains a header area for text and a schedule area for plotting graphic representations of milestone objects in a flexible timeline. XOPPS is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided with the capability to automatically convert a milestone event to a slip. A milestone schedule on another computer can be saved to an ASCII file to be read by XOPPS. The program can print a schedule to a PostScript file. Dependencies between objects can also be displayed on the chart through the use of precedence lines. This program is not intended to replace a commercial scheduling/project management program. Because XOPPS has

  10. Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times.

    PubMed

    Yang, Xin; Zeng, Zhenxiang; Wang, Ruidong; Sun, Xueshan

    2016-01-01

    This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The case study on GM Corporation verifies that the NSGA-II used in this paper is effective and has advantages to solve the proposed model comparing with HPSO and PSO+SA. The idea and method of the paper can be generalized widely in the manufacturing industry, because it can reduce the energy consumption of the energy-intensive manufacturing enterprise with less investment when the new approach is applied in existing systems.

  11. Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times

    PubMed Central

    Zeng, Zhenxiang; Wang, Ruidong; Sun, Xueshan

    2016-01-01

    This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The case study on GM Corporation verifies that the NSGA-II used in this paper is effective and has advantages to solve the proposed model comparing with HPSO and PSO+SA. The idea and method of the paper can be generalized widely in the manufacturing industry, because it can reduce the energy consumption of the energy-intensive manufacturing enterprise with less investment when the new approach is applied in existing systems. PMID:27907163

  12. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  13. Medicare patients' use of overpriced procedures before and after the Omnibus Budget Reconciliation Act of 1987.

    PubMed Central

    Escarce, J J

    1993-01-01

    OBJECTIVES. Under the Omnibus Budget Reconciliation Act of 1987, Medicare reduced physician fees for 12 procedures identified as overprices. This paper describes trends in the use of these procedures and other physician services by Medicare patients during the 4-year period surrounding the implementation of the 1987 budget act. METHODS. Medicare physician claims files were used to develop trends in physician-services use from 1986 to 1989. Services were grouped into four categories: overpriced procedures, other surgery, medical care, and ancillary tests. RESULTS. Growth in the volume of overpriced procedures slowed substantially after the 1987 budget act was implemented. Moreover, the reduction in the rate of volume growth for these procedures differed little among specialities or areas. In comparison, the rate of volume growth fell modestly for other surgery, was unchanged for medical care, and increased for ancillary tests. CONCLUSIONS. Increases do not necessarily occur in the volume of surgical procedures whose Medicare fees are reduced. Although the conclusions that may be drawn from a descriptive analysis are limited, these findings suggest that concerns that the resource-based Medicare fee schedule will lead to higher surgery rates may be unwarranted. PMID:8438971

  14. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  15. Decision making in the Navy Budget Office.

    DTIC Science & Technology

    1986-06-01

    The primary objective of this thesis is to familiarize the reader with the budget decision making pocesses and considerations which influence the ...formulation of the Department of the navy’s (DON) budget from perspective of the Office of Budget and Reports (OBR), the impact of resource allocation...budgetary) decisions upon the overall framwork within which DON budgetary decisions are made, the organizational

  16. Medicare program; model fee schedule for physicians' services--HCFA. Notice with comment period.

    PubMed

    1990-09-04

    This notice announces and invites comments on a model fee schedule for physicians' services that is required by section 6102 of the Omnibus Budget Reconciliation Act of 1989. The model fee schedule provides very preliminary estimates for some, but not all, services to illustrate the effects of the Medicare physician payment fee schedule that will begin to take effect in January 1992. In accordance with section 6102(f)(11), we are making the model fee schedule available to the public through publication of this notice. Any comments received from the public will be considered carefully, but not specifically addressed in a subsequent proposed rule.

  17. Budget Brief: 2015 Proposed Budget Milwaukee Public Schools

    ERIC Educational Resources Information Center

    Allen, Vanessa; Chapman, Anne; Henken, Rob

    2014-01-01

    In this report, the authors provide a detailed analysis of the major changes in revenue and expenditures in the Milwaukee Public Schools (MPS) 2015 proposed budget, and the manner in which MPS has responded to recent legislative changes and turbulent workforce challenges. The objective is to provide an independent assessment of the district's…

  18. Ray D. Nixon plant built below budget. [Colorado Springs, CO

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGlasson, W.J.

    1980-12-01

    The Ray D. Nixon plant was built in Colorado Springs at about $250,000 below the $100 million budgeted. Permit and operating deadlines provided important incentives to maintain the construction schedule, requiring intensive management efforts to keep cooperation and productivity high. The plant is also a model for environmental and wildlife protection. (DCK)

  19. Techniques for cash management in scheduling manufacturing operations

    NASA Astrophysics Data System (ADS)

    Morady Gohareh, Mehdy; Shams Gharneh, Naser; Ghasemy Yaghin, Reza

    2017-06-01

    The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of managing the flow of cash. We have defined two new objectives: maximization of average and minimum available cash. For single machine scheduling, it is demonstrated that scheduling jobs in decreasing order of profit ratios maximizes the former and improves productivity. Moreover, scheduling jobs in increasing order of costs and breaking ties in decreasing order of prices maximizes the latter and creates protection against financial instability.

  20. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  1. Scheduling Observations of Celestial Objects for Earth Observing Sensor Calibration

    NASA Technical Reports Server (NTRS)

    Wilson, Truman; Xiong, Xiaoxiong

    2016-01-01

    Radiometric calibration of Earth-observing satellite sensors is critical for tracking on-orbit gain changes through- out the satellite's mission. The Moon, being a stable, well-characterized radiometric target, has been used effectively for tracking the relative gain changes of the reflective solar bands for the Moderate Resolution Imaging Spectroradiometer (MODIS) on board EOS AM-1 (Terra) and PM-1 (Aqua). The Moon is viewed through the MODIS space-view port, and the relative phase of the Moon is restricted to within 0.5 degrees of a chosen target phase to increase the accuracy of the calibration. These geometric restrictions require spacecraft maneuvers in order to bring space-view port into proper alignment with the position of the Moon when the phase requirement is met. In this paper, we describe a versatile tool for scheduling such maneuvers based on the required geometry and lunar phase restrictions for a general spacecraft bound instrument. The results of the scheduling tool have been verified using lunar images from Aqua and Terra MODIS after a scheduled roll maneuver was performed. This tool has also been tested for the Visible Infrared Imaging Radiometer Suite (VIIRS) and the Advanced Technology Microwave Sounder on-board the Suomi-NPP spacecraft. As an extension of this work, we have also developed a tool for scheduling views of bright stars. These stars provide another well-characterized radiometric source that can be used for sensor calibration. This tool has been implemented to determine the times in which a chosen star can be viewed by the high gain stages of the day/night band for the VIIRS instrument.

  2. Input-output analysis and the hospital budgeting process.

    PubMed Central

    Cleverly, W O

    1975-01-01

    Two hospitals budget systems, a conventional budget and an input-output budget, are compared to determine how they affect management decisions in pricing, output, planning, and cost control. Analysis of data from a 210-bed not-for-profit hospital indicates that adoption of the input-output budget could cause substantial changes in posted hospital rates in individual departments but probably would have no impact on hospital output determination. The input-output approach promises to be a more accurate system for cost control and planning because, unlike the conventional approach, it generates objective signals for investigating variances of expenses from budgeted levels. PMID:1205865

  3. Scheduling for energy and reliability management on multiprocessor real-time systems

    NASA Astrophysics Data System (ADS)

    Qi, Xuan

    Scheduling algorithms for multiprocessor real-time systems have been studied for years with many well-recognized algorithms proposed. However, it is still an evolving research area and many problems remain open due to their intrinsic complexities. With the emergence of multicore processors, it is necessary to re-investigate the scheduling problems and design/develop efficient algorithms for better system utilization, low scheduling overhead, high energy efficiency, and better system reliability. Focusing cluster schedulings with optimal global schedulers, we study the utilization bound and scheduling overhead for a class of cluster-optimal schedulers. Then, taking energy/power consumption into consideration, we developed energy-efficient scheduling algorithms for real-time systems, especially for the proliferating embedded systems with limited energy budget. As the commonly deployed energy-saving technique (e.g. dynamic voltage frequency scaling (DVFS)) will significantly affect system reliability, we study schedulers that have intelligent mechanisms to recuperate system reliability to satisfy the quality assurance requirements. Extensive simulation is conducted to evaluate the performance of the proposed algorithms on reduction of scheduling overhead, energy saving, and reliability improvement. The simulation results show that the proposed reliability-aware power management schemes could preserve the system reliability while still achieving substantial energy saving.

  4. Radiation budget measurement/model interface

    NASA Technical Reports Server (NTRS)

    Vonderhaar, T. H.; Ciesielski, P.; Randel, D.; Stevens, D.

    1983-01-01

    This final report includes research results from the period February, 1981 through November, 1982. Two new results combine to form the final portion of this work. They are the work by Hanna (1982) and Stevens to successfully test and demonstrate a low-order spectral climate model and the work by Ciesielski et al. (1983) to combine and test the new radiation budget results from NIMBUS-7 with earlier satellite measurements. Together, the two related activities set the stage for future research on radiation budget measurement/model interfacing. Such combination of results will lead to new applications of satellite data to climate problems. The objectives of this research under the present contract are therefore satisfied. Additional research reported herein includes the compilation and documentation of the radiation budget data set a Colorado State University and the definition of climate-related experiments suggested after lengthy analysis of the satellite radiation budget experiments.

  5. Toward an Autonomous Telescope Network: the TBT Scheduler

    NASA Astrophysics Data System (ADS)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  6. Effective Schedule and Cost Management as a Product Development Lead

    NASA Technical Reports Server (NTRS)

    Simmons, Cynthia

    2015-01-01

    The presentation will be given at the 26th Annual Thermal Fluids Analysis Workshop (TFAWS 2015) hosted by the Goddard SpaceFlight Center (GSFC) Thermal Engineering Branch (Code 545). This course provides best practices, helpful tools and lessons learned for staying on plan and day-to-day management of Subsystem flight development after getting Project approval for your Subsystem schedule and budget baseline.

  7. 7 CFR 3402.14 - Budget and budget narrative.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Budget and budget narrative. 3402.14 Section 3402.14... GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.14 Budget and budget narrative. Applicants must prepare the Budget, Form CSREES-2004, and a budget narrative...

  8. Job shop scheduling problem with late work criterion

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  9. Reactive Scheduling in Multipurpose Batch Plants

    NASA Astrophysics Data System (ADS)

    Narayani, A.; Shaik, Munawar A.

    2010-10-01

    Scheduling is an important operation in process industries for improving resource utilization resulting in direct economic benefits. It has a two-fold objective of fulfilling customer orders within the specified time as well as maximizing the plant profit. Unexpected disturbances such as machine breakdown, arrival of rush orders and cancellation of orders affect the schedule of the plant. Reactive scheduling is generation of a new schedule which has minimum deviation from the original schedule in spite of the occurrence of unexpected events in the plant operation. Recently, Shaik & Floudas (2009) proposed a novel unified model for short-term scheduling of multipurpose batch plants using unit-specific event-based continuous time representation. In this paper, we extend the model of Shaik & Floudas (2009) to handle reactive scheduling.

  10. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  11. How to Communicate Your Budget to Nonfinance People

    ERIC Educational Resources Information Center

    Jones, Linda

    2011-01-01

    A school district's budget tells the community a story about the district's visions for its students. It is also a planning vehicle that outlines the district's goals and objectives by showing the degree to which its priorities are being supported. Communicating one's district budget to the community--especially to nonfinancial people--in…

  12. Electricity usage scheduling in smart building environments using smart devices.

    PubMed

    Lee, Eunji; Bahn, Hyokyung

    2013-01-01

    With the recent advances in smart grid technologies as well as the increasing dissemination of smart meters, the electricity usage of every moment can be detected in modern smart building environments. Thus, the utility company adopts different price of electricity at each time slot considering the peak time. This paper presents a new electricity usage scheduling algorithm for smart buildings that adopts real-time pricing of electricity. The proposed algorithm detects the change of electricity prices by making use of a smart device and changes the power mode of each electric device dynamically. Specifically, we formulate the electricity usage scheduling problem as a real-time task scheduling problem and show that it is a complex search problem that has an exponential time complexity. An efficient heuristic based on genetic algorithms is performed on a smart device to cut down the huge searching space and find a reasonable schedule within a feasible time budget. Experimental results with various building conditions show that the proposed algorithm reduces the electricity charge of a smart building by 25.6% on average and up to 33.4%.

  13. Scheduling multimedia services in cloud computing environment

    NASA Astrophysics Data System (ADS)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  14. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  15. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  16. Defense Budgeting in a Constrained Economy: Reengineering the Budget Process to Meet the Challenge of a Modernizing Zimbabwe Defense Force

    DTIC Science & Technology

    1998-06-01

    Public Policy Analysis and Management Vol. 5 (Connecticut: JAI Press Inc ., 1992) 20. 38 Thomas A Simcik, Reengineering the Navy Program Objective...Winston Inc .,1969. Olvey, Lee D. The Economics of National Security, Avery Publishing Group : 1984. Premchand, A., Government Budgeting And Expenditure... the current process is presented and analyzed against relevant theory on policy analysis , reengineering, and contemporary budgeting systems, in

  17. Production scheduling with ant colony optimization

    NASA Astrophysics Data System (ADS)

    Chernigovskiy, A. S.; Kapulin, D. V.; Noskova, E. E.; Yamskikh, T. N.; Tsarev, R. Yu

    2017-10-01

    The optimum solution of the production scheduling problem for manufacturing processes at an enterprise is crucial as it allows one to obtain the required amount of production within a specified time frame. Optimum production schedule can be found using a variety of optimization algorithms or scheduling algorithms. Ant colony optimization is one of well-known techniques to solve the global multi-objective optimization problem. In the article, the authors present a solution of the production scheduling problem by means of an ant colony optimization algorithm. A case study of the algorithm efficiency estimated against some others production scheduling algorithms is presented. Advantages of the ant colony optimization algorithm and its beneficial effect on the manufacturing process are provided.

  18. Budgeting with Dan, the Hobo Man. Teacher's Guide [and] Student Materials.

    ERIC Educational Resources Information Center

    Ranabargar, Cheryl

    Designed for third grade language arts students, this learning capsule contains student materials and a teacher's guide for a unit on budgeting. Objectives are to discriminate between wants and needs, distinguish parts of a budget, and construct a budget. The unit requires four to six hours of instructional time and is designed for use with a…

  19. The impact of alternative pricing methods for drugs in California Workers’ Compensation System: Fee-schedule pricing

    PubMed Central

    Wilson, Leslie; Turkistani, Fatema A.; Huang, Wei; Tran, Dang M.; Lin, Tracy Kuo

    2018-01-01

    Introduction California’s Workers’ Compensation System (CAWCS) Department of Industrial Relations questioned the adequacy of the current Medi-Cal fee-schedule pricing and requested analysis of alternatives that maximize price availability and maintain budget neutrality. Objectives To compare CAWCS pharmacy-dispensed (PD) drug prices under alternative fee schedules, and identify combinations of alternative benchmarks that have prices available for the largest percentage of PD drugs and that best reach budget neutrality. Methods Claims transaction-level data (2011–2013) from CAWCS were used to estimate total annual PD pharmaceutical payments. Medi-Cal pricing data was from the Workman’s Compensation Insurance System (WCIS). Average Wholesale Prices (AWP), Wholesale Acquisition Costs (WAC), Direct Prices (DP), Federal Upper Limit (FUL) prices, and National Average Drug Acquisition Costs (NADAC) were from Medi-Span. We matched National Drug Codes (NDCs), pricing dates, and drug quantity for comparisons. We report pharmacy-dispensed (PD) claims frequency, reimbursement matching rate, and paid costs by CAWCS as the reference price against all alternative price benchmarks. Results Of 12,529,977 CAWCS claims for pharmaceutical products 11.6% (1,462,814) were for PD drugs. Prescription drug cost for CAWCS was over $152M; $63.9M, $47.9M, and $40.6M in 2011–2013. Ninety seven percent of these CAWCS PD claims had a Medi-Cal price. Alternative mechanisms provided a price for fewer claims; NADAC 94.23%, AWP 90.94%, FUL 73.11%, WAC 66.98%, and DP 14.33%. Among CAWCS drugs with no Medi-Cal price in PD claims, AWP, WAC, NADAC, DP, and FUL provided prices for 96.7%, 63.14%, 24.82%, 20.83%, and 15.08% of claims. Overall CAWCS paid 100.52% of Medi-Cal, 60% of AWP, 97% of WAC, 309.53% of FUL, 103.83% of DP, and 136.27% of NADAC. Conclusions CAWCS current Medi-Cal fee-schedule price list for PD drugs is more complete than all alternative fee-schedules. However, all

  20. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  1. 7 CFR 277.3 - Budgets and budget revision procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Budgets and budget revision procedures. 277.3 Section... OF STATE AGENCIES § 277.3 Budgets and budget revision procedures. The preparation, content, submittal, and revision requirements for the State Food Stamp Program Budget shall be as specified in § 272.2...

  2. Projecting Future Scheduled Airline Demand, Schedules and NGATS Benefits Using TSAM

    NASA Technical Reports Server (NTRS)

    Dollyhigh, Samuel; Smith, Jeremy; Viken, Jeff; Trani, Antonio; Baik, Hojong; Hinze, Nickolas; Ashiabor, Senanu

    2006-01-01

    The Transportation Systems Analysis Model (TSAM) developed by Virginia Tech s Air Transportation Systems Lab and NASA Langley can provide detailed analysis of the effects on the demand for air travel of a full range of NASA and FAA aviation projects. TSAM has been used to project the passenger demand for very light jet (VLJ) air taxi service, scheduled airline demand growth and future schedules, Next Generation Air Transportation System (NGATS) benefits, and future passenger revenues for the Airport and Airway Trust Fund. TSAM can project the resulting demand when new vehicles and/or technology is inserted into the long distance (100 or more miles one-way) transportation system, as well as, changes in demand as a result of fare yield increases or decreases, airport transit times, scheduled flight times, ticket taxes, reductions or increases in flight delays, and so on. TSAM models all long distance travel in the contiguous U.S. and determines the mode choice of the traveler based on detailed trip costs, travel time, schedule frequency, purpose of the trip (business or non-business), and household income level of the traveler. Demand is modeled at the county level, with an airport choice module providing up to three airports as part of the mode choice. Future enplanements at airports can be projected for different scenarios. A Fratar algorithm and a schedule generator are applied to generate future flight schedules. This paper presents the application of TSAM to modeling future scheduled air passenger demand and resulting airline schedules, the impact of NGATS goals and objectives on passenger demand, along with projections for passenger fee receipts for several scenarios for the FAA Airport and Airway Trust Fund.

  3. Implications of the Budgeting Process on State-of-the-Art (SOA) Extensions.

    DTIC Science & Technology

    1987-12-01

    CLASSIFICATION AUTHORITY 3 DISTRIBUTION /AVAILABILITY OF REPORT Approved for public release; Zb DECLASSiFICATION1DOWNGRADING SCHEDULE Distribution is...PROGRAM PROJECT TASK WORK UNIT ELEMENT NO. NO NO ACCESSION NO 11. TITLE (Include Security Classification ) IMPLICATIONS OF THE BUDGETING PROCESS ON STATE...20 DISTRIBUTIONAVAILABILITY OF ABSTRACT 21 ABSTRACT SECURITY CLASSIFICATION 0 UNCLASSIFIED,UNLIMI"ED 0 SAME AS RPT QJ DTIC USERS UNCLASSIFIED 22a

  4. A New Approach in Public Budgeting: Citizens' Budget

    ERIC Educational Resources Information Center

    Bilge, Semih

    2015-01-01

    Change and transformation in the understanding and definition of citizenship has led to the emergence of citizen-oriented public service approach. This approach also raised a new term and concept in the field of public budgeting because of the transformation in the processes of public budgeting: citizens' budget. The citizens' budget which seeks…

  5. Multiple R&D projects scheduling optimization with improved particle swarm algorithm.

    PubMed

    Liu, Mengqi; Shan, Miyuan; Wu, Juan

    2014-01-01

    For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly. This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period. Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment. Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.

  6. A planning and scheduling lexicon

    NASA Technical Reports Server (NTRS)

    Cruz, Jennifer W.; Eggemeyer, William C.

    1989-01-01

    A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.

  7. Scheduling Future Water Supply Investments Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2014-12-01

    Uncertain hydrological impacts of climate change, population growth and institutional changes pose a major challenge to planning of water supply systems. Planners seek optimal portfolios of supply and demand management schemes but also when to activate assets whilst considering many system goals and plausible futures. Incorporation of scheduling into the planning under uncertainty problem strongly increases its complexity. We investigate some approaches to scheduling with many-objective heuristic search. We apply a multi-scenario many-objective scheduling approach to the Thames River basin water supply system planning problem in the UK. Decisions include which new supply and demand schemes to implement, at what capacity and when. The impact of different system uncertainties on scheme implementation schedules are explored, i.e. how the choice of future scenarios affects the search process and its outcomes. The activation of schemes is influenced by the occurrence of extreme hydrological events in the ensemble of plausible scenarios and other factors. The approach and results are compared with a previous study where only the portfolio problem is addressed (without scheduling).

  8. Electricity Usage Scheduling in Smart Building Environments Using Smart Devices

    PubMed Central

    Lee, Eunji; Bahn, Hyokyung

    2013-01-01

    With the recent advances in smart grid technologies as well as the increasing dissemination of smart meters, the electricity usage of every moment can be detected in modern smart building environments. Thus, the utility company adopts different price of electricity at each time slot considering the peak time. This paper presents a new electricity usage scheduling algorithm for smart buildings that adopts real-time pricing of electricity. The proposed algorithm detects the change of electricity prices by making use of a smart device and changes the power mode of each electric device dynamically. Specifically, we formulate the electricity usage scheduling problem as a real-time task scheduling problem and show that it is a complex search problem that has an exponential time complexity. An efficient heuristic based on genetic algorithms is performed on a smart device to cut down the huge searching space and find a reasonable schedule within a feasible time budget. Experimental results with various building conditions show that the proposed algorithm reduces the electricity charge of a smart building by 25.6% on average and up to 33.4%. PMID:24453860

  9. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    NASA Technical Reports Server (NTRS)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  10. Scheduling time-critical graphics on multiple processors

    NASA Technical Reports Server (NTRS)

    Meyer, Tom W.; Hughes, John F.

    1995-01-01

    This paper describes an algorithm for the scheduling of time-critical rendering and computation tasks on single- and multiple-processor architectures, with minimal pipelining. It was developed to manage scientific visualization scenes consisting of hundreds of objects, each of which can be computed and displayed at thousands of possible resolution levels. The algorithm generates the time-critical schedule using progressive-refinement techniques; it always returns a feasible schedule and, when allowed to run to completion, produces a near-optimal schedule which takes advantage of almost the entire multiple-processor system.

  11. Innovative routing and scheduling concepts for transit systems.

    DOT National Transportation Integrated Search

    1984-01-01

    The objective of this research was to investigate innovative routing and scheduling concepts to determine how transit systems in Virginia may improve ridership and reduce operating costs. Information on innovative routing and scheduling concepts was ...

  12. Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization.

    PubMed

    Huang, Song; Tian, Na; Wang, Yan; Ji, Zhicheng

    2016-01-01

    Taking resource allocation into account, flexible job shop problem (FJSP) is a class of complex scheduling problem in manufacturing system. In order to utilize the machine resources rationally, multi-objective particle swarm optimization (MOPSO) integrating with variable neighborhood search is introduced to address FJSP efficiently. Firstly, the assignment rules (AL) and dispatching rules (DR) are provided to initialize the population. And then special discrete operators are designed to produce new individuals and earliest completion machine (ECM) is adopted in the disturbance operator to escape the optima. Secondly, personal-best archives (cognitive memories) and global-best archive (social memory), which are updated by the predefined non-dominated archive update strategy, are simultaneously designed to preserve non-dominated individuals and select personal-best positions and the global-best position. Finally, three neighborhoods are provided to search the neighborhoods of global-best archive for enhancing local search ability. The proposed algorithm is evaluated by using Kacem instances and Brdata instances, and a comparison with other approaches shows the effectiveness of the proposed algorithm for FJSP.

  13. 7 CFR 277.3 - Budgets and budget revision procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Budgets and budget revision procedures. 277.3 Section 277.3 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE... OF STATE AGENCIES § 277.3 Budgets and budget revision procedures. The preparation, content, submittal...

  14. 7 CFR 277.3 - Budgets and budget revision procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Budgets and budget revision procedures. 277.3 Section 277.3 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE... OF STATE AGENCIES § 277.3 Budgets and budget revision procedures. The preparation, content, submittal...

  15. 7 CFR 277.3 - Budgets and budget revision procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Budgets and budget revision procedures. 277.3 Section 277.3 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE... OF STATE AGENCIES § 277.3 Budgets and budget revision procedures. The preparation, content, submittal...

  16. 7 CFR 277.3 - Budgets and budget revision procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Budgets and budget revision procedures. 277.3 Section 277.3 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE... OF STATE AGENCIES § 277.3 Budgets and budget revision procedures. The preparation, content, submittal...

  17. Conception of Self-Construction Production Scheduling System

    NASA Astrophysics Data System (ADS)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  18. Periodic self-rostering in shift work: correspondence between objective work hours, work hour preferences (personal fit), and work schedule satisfaction.

    PubMed

    Ingre, Michael; Åkerstedt, Torbjörn; Ekstedt, Mirjam; Kecklund, Göran

    2012-07-01

    The main objective of the present study was to investigate relative personal fit as the association between rated needs and preferences for work hours, on the one hand, and actual work hours, on the other hand, in three groups (hospital, call-center, and police) working with periodic self-rostering. We also examined the association between personal fit and satisfaction with the work schedule and preference for a fixed and regular shift schedule, respectively. We collected questionnaire data and objective work hour data over 6-12 months from the computerized self-rostering system. The response rate of the questionnaire was 69% at the hospital and call-center and 98% among the police. In total, 29 433 shifts for 285 shift workers were included in the study. Data was analyzed by means of mixed ANOVA, Kendal tau correlations and ordinal (proportional odds) logistic regression. The results show that evening types worked relatively more hours during the evening and night hours compared to morning types as an indication of relative personal fit. Relative personal fit was also found for long shift, short rest, and morning-, evening- and night-shift frequency, but only personal fit related to morning, evening and night-shift was associated with satisfaction with work hours. Reported conflicts at the workplace about work hours and problems with lack of predictability of time for family/leisure activities, was associated with poor satisfaction and a preference for a fixed shift schedule. The present study shows that periodic self-rostering is associated with relative personal fit, in particular with respect to night, evening, and morning work. Personal fit seems to be associated with satisfaction with work hours and may be a moderator of tolerance to shift work exposure.

  19. Washington State Community College Operating Budget, 1985-87. Management Summary.

    ERIC Educational Resources Information Center

    Washington State Board for Community Coll. Education, Olympia.

    A summary is presented of the 1985-87 community college operating budget request for the Washington State Community colleges, along with a description of the policy considerations inherent in the request and the anticipated effect of the request on community college programs. The philosophy and objectives underpinning the budget request are…

  20. A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems

    NASA Astrophysics Data System (ADS)

    Moghaddam, Kamran S.; Usher, John S.

    2011-07-01

    In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.

  1. Balancing Authority Cooperation Concepts - Intra-Hour Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunsaker, Matthew; Samaan, Nader; Milligan, Michael

    2013-03-29

    The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similarmore » and/or unchanged among the scenarios.« less

  2. Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects.

    PubMed

    Yue, Lei; Guan, Zailin; Saif, Ullah; Zhang, Fei; Wang, Hao

    2016-01-01

    Group scheduling is significant for efficient and cost effective production system. However, there exist setup times between the groups, which require to decrease it by sequencing groups in an efficient way. Current research is focused on a sequence dependent group scheduling problem with an aim to minimize the makespan in addition to minimize the total weighted tardiness simultaneously. In most of the production scheduling problems, the processing time of jobs is assumed as fixed. However, the actual processing time of jobs may be reduced due to "learning effect". The integration of sequence dependent group scheduling problem with learning effects has been rarely considered in literature. Therefore, current research considers a single machine group scheduling problem with sequence dependent setup times and learning effects simultaneously. A novel hybrid Pareto artificial bee colony algorithm (HPABC) with some steps of genetic algorithm is proposed for current problem to get Pareto solutions. Furthermore, five different sizes of test problems (small, small medium, medium, large medium, large) are tested using proposed HPABC. Taguchi method is used to tune the effective parameters of the proposed HPABC for each problem category. The performance of HPABC is compared with three famous multi objective optimization algorithms, improved strength Pareto evolutionary algorithm (SPEA2), non-dominated sorting genetic algorithm II (NSGAII) and particle swarm optimization algorithm (PSO). Results indicate that HPABC outperforms SPEA2, NSGAII and PSO and gives better Pareto optimal solutions in terms of diversity and quality for almost all the instances of the different sizes of problems.

  3. SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions

    NASA Technical Reports Server (NTRS)

    Kao, Cheng-Yan; Lee, Seok-Hua

    1992-01-01

    The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.

  4. Under Secretary of Defense (Comptroller) > Budget Materials > Budget1998

    Science.gov Websites

    (Comptroller) Under Secretary of Defense (Comptroller) Home About OUSD(C) OUSD(C) Top Leaders OUSD(C) Org Chart functionalStatements OUSD(C) History FMR Budget Materials Budget Execution Financial Management Improving Financial Closure Program (C-1) PDF icon Excel icon Links to Budget Materials Budget Execution Flexibilities

  5. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  6. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  7. Improved Space Surveillance Network (SSN) Scheduling using Artificial Intelligence Techniques

    NASA Astrophysics Data System (ADS)

    Stottler, D.

    There are close to 20,000 cataloged manmade objects in space, the large majority of which are not active, functioning satellites. These are tracked by phased array and mechanical radars and ground and space-based optical telescopes, collectively known as the Space Surveillance Network (SSN). A better SSN schedule of observations could, using exactly the same legacy sensor resources, improve space catalog accuracy through more complementary tracking, provide better responsiveness to real-time changes, better track small debris in low earth orbit (LEO) through efficient use of applicable sensors, efficiently track deep space (DS) frequent revisit objects, handle increased numbers of objects and new types of sensors, and take advantage of future improved communication and control to globally optimize the SSN schedule. We have developed a scheduling algorithm that takes as input the space catalog and the associated covariance matrices and produces a globally optimized schedule for each sensor site as to what objects to observe and when. This algorithm is able to schedule more observations with the same sensor resources and have those observations be more complementary, in terms of the precision with which each orbit metric is known, to produce a satellite observation schedule that, when executed, minimizes the covariances across the entire space object catalog. If used operationally, the results would be significantly increased accuracy of the space catalog with fewer lost objects with the same set of sensor resources. This approach inherently can also trade-off fewer high priority tasks against more lower-priority tasks, when there is benefit in doing so. Currently the project has completed a prototyping and feasibility study, using open source data on the SSN's sensors, that showed significant reduction in orbit metric covariances. The algorithm techniques and results will be discussed along with future directions for the research.

  8. 48 CFR 538.270 - Evaluation of multiple award schedule (MAS) offers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES ADMINISTRATION SPECIAL CATEGORIES OF CONTRACTING FEDERAL SUPPLY SCHEDULE CONTRACTING Establishing and Administering Federal Supply Schedules 538.270 Evaluation of multiple award schedule (MAS) offers... determining the Government's price negotiation objectives, consider the following factors: (1) Aggregate...

  9. Incremental Scheduling Engines: Cost Savings through Automation

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  10. Construction schedules slack time minimizing

    NASA Astrophysics Data System (ADS)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  11. Uncertainty of water budget closure across the Long-Term Agroecosystems Research network

    USDA-ARS?s Scientific Manuscript database

    Quantification of the various components of the hydrologic budget at a site (precipitation, evaporation, runoff,…) gives important indications about major and minor hydrologic processes controlling field and watershed scale response. The objectives of this study were to: 1) develop hydrologic budget...

  12. Water-budget methods

    USGS Publications Warehouse

    Healy, Richard W.; Scanlon, Bridget R.

    2010-01-01

    A water budget is an accounting of water movement into and out of, and storage change within, some control volume. Universal and adaptable are adjectives that reflect key features of water-budget methods for estimating recharge. The universal concept of mass conservation of water implies that water-budget methods are applicable over any space and time scales (Healy et al., 2007). The water budget of a soil column in a laboratory can be studied at scales of millimeters and seconds. A water-budget equation is also an integral component of atmospheric general circulation models used to predict global climates over periods of decades or more. Water-budget equations can be easily customized by adding or removing terms to accurately portray the peculiarities of any hydrologic system. The equations are generally not bound by assumptions on mechanisms by which water moves into, through, and out of the control volume of interest. So water-budget methods can be used to estimate both diffuse and focused recharge, and recharge estimates are unaffected by phenomena such as preferential flow paths within the unsaturated zone.Water-budget methods represent the largest class of techniques for estimating recharge. Most hydrologic models are derived from a water-budget equation and can therefore be classified as water-budget models. It is not feasible to address all water-budget methods in a single chapter. This chapter is limited to discussion of the “residual” water-budget approach, whereby all variables in a water-budget equation, except for recharge, are independently measured or estimated and recharge is set equal to the residual. This chapter is closely linked with Chapter 3, on modeling methods, because the equations presented here form the basis of many models and because models are often used to estimate individual components in water-budget studies. Water budgets for streams and other surface-water bodies are addressed in Chapter 4. The use of soil-water budgets and

  13. A Product Evaluation of the Selective Abandonment Process for School Budgeting

    ERIC Educational Resources Information Center

    Loofe, Christopher M.

    2016-01-01

    The purpose of this study is to evaluate the degree to which the Selective Abandonment budget process objectives were achieved by analyzing stakeholder perceptions. Use of this evaluation may enable the district to become more effective, efficient, and more fiscally responsible when developing future program budgeting plans. Program evaluation was…

  14. Steps Toward Optimal Competitive Scheduling

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Crawford, James; Khatib, Lina; Brafman, Ronen

    2006-01-01

    committee is usually in charge of deciding the priority of each mission competing for access to the DSN within a time period while scheduling. Instead, we can assume that the committee assigns a budget to each mission.This paper is concerned with the problem of allocating a unit capacity resource to multiple users within a pre-defined time period. The resource is indivisible, so that at most one user can use it at each time instance. However, different users may use it at different times. The users have independent, se@sh preferences for when and for how long they are allocated this resource. Thus, they value different resource access durations differently, and they value different time slots differently. We seek an optimal allocation schedule for this resource. This problem arises in many institutional settings where, e.g., different departments, agencies, or personal, compete for a single resource. We are particularly motivated by the problem of scheduling NASA's Deep Space Satellite Network (DSN) among different users within NASA. Access to DSN is needed for transmitting data from various space missions to Earth. Each mission has different needs for DSN time, depending on satellite and planetary orbits. Typically, the DSN is over-subscribed, in that not all missions will be allocated as much time as they want. This leads to various inefficiencies - missions spend much time and resource lobbying for their time, often exaggerating their needs. NASA, on the other hand, would like to make optimal use of this resource, ensuring that the good for NASA is maximized. This raises the thorny problem of how to measure the utility to NASA of each allocation. In the typical case, it is difficult for the central agency, NASA in our case, to assess the value of each interval to each user - this is really only known to the users who understand their needs. Thus, our problem is more precisely formulated as follows: find an allocation schedule for the resource that maximizes the sum

  15. Technology for planning and scheduling under complex constraints

    NASA Astrophysics Data System (ADS)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  16. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  17. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  18. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  19. Objectives, Budgets, Thresholds, and Opportunity Costs-A Health Economics Approach: An ISPOR Special Task Force Report [4].

    PubMed

    Danzon, Patricia M; Drummond, Michael F; Towse, Adrian; Pauly, Mark V

    2018-02-01

    The fourth section of our Special Task Force report focuses on a health plan or payer's technology adoption or reimbursement decision, given the array of technologies, on the basis of their different values and costs. We discuss the role of budgets, thresholds, opportunity costs, and affordability in making decisions. First, we discuss the use of budgets and thresholds in private and public health plans, their interdependence, and connection to opportunity cost. Essentially, each payer should adopt a decision rule about what is good value for money given their budget; consistent use of a cost-per-quality-adjusted life-year threshold will ensure the maximum health gain for the budget. In the United States, different public and private insurance programs could use different thresholds, reflecting the differing generosity of their budgets and implying different levels of access to technologies. In addition, different insurance plans could consider different additional elements to the quality-adjusted life-year metric discussed elsewhere in our Special Task Force report. We then define affordability and discuss approaches to deal with it, including consideration of disinvestment and related adjustment costs, the impact of delaying new technologies, and comparative cost effectiveness of technologies. Over time, the availability of new technologies may increase the amount that populations want to spend on health care. We then discuss potential modifiers to thresholds, including uncertainty about the evidence used in the decision-making process. This article concludes by discussing the application of these concepts in the context of the pluralistic US health care system, as well as the "excess burden" of tax-financed public programs versus private programs. Copyright © 2018 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  20. Multi-unit auctions with budget-constrained bidders

    NASA Astrophysics Data System (ADS)

    Ghosh, Gagan Pratap

    In my dissertation, I investigate the effects of budget-constraints in multi-unit auctions. This is done in three parts. First, I analyze a case where all bidders have a common budget constraint. Precisely, I analyze an auction where two units of an object are sold at two simultaneous, sealed bid, first-price auctions, to bidders who have demand for both units. Bidders differ with respect to their valuations for the units. All bidders have an identical budget constraint which binds their ability to spend in the auction. I show that if valuation distribution is atom-less, then their does not exist any symmetric equilibrium in this auction game. In the second and third parts of my thesis, I analyze the sale of licenses for the right to drill for oil and natural gas in the Outer Continental Shelf (OCS) of the United States. These sales are conducted using simultaneous sealed-bid first-price auctions for multiple licenses, each representing a specific area (called a tract). Using aspects of observed bidding-behavior, I first make a prima facie case that bidders are budget-constrained in these auctions. In order to formalize this argument, I develop a simple extension of the standard model (where bidders differ in their valuations for the objects) by incorporating (random) budgets for the bidders. The auction-game then has a two-dimensional set of types for each player. I study the theoretical properties of this auction, assuming for simplicity that two units are being sold. I show that this game has an equilibrium in pure strategies that is symmetric with respect to the players and with respect to the units. The strategies are essentially pure in the sense that each bidder-type has a unique split (up to a permutation) of his budget between the two auctions. I then characterize the equilibrium in terms of the bid-distribution and iso-bid curves in the value-budget space. I derive various qualitative features of this equilibrium, among which are: (1) under mild

  1. Monitoring objects orbiting earth using satellite-based telescopes

    DOEpatents

    Olivier, Scot S.; Pertica, Alexander J.; Riot, Vincent J.; De Vries, Willem H.; Bauman, Brian J.; Nikolaev, Sergei; Henderson, John R.; Phillion, Donald W.

    2015-06-30

    An ephemeris refinement system includes satellites with imaging devices in earth orbit to make observations of space-based objects ("target objects") and a ground-based controller that controls the scheduling of the satellites to make the observations of the target objects and refines orbital models of the target objects. The ground-based controller determines when the target objects of interest will be near enough to a satellite for that satellite to collect an image of the target object based on an initial orbital model for the target objects. The ground-based controller directs the schedules to be uploaded to the satellites, and the satellites make observations as scheduled and download the observations to the ground-based controller. The ground-based controller then refines the initial orbital models of the target objects based on the locations of the target objects that are derived from the observations.

  2. Budget Thoughts.

    ERIC Educational Resources Information Center

    Bialostosky, Don

    2001-01-01

    Addresses budget issues in terms of "getting" and "spending." Notes that educators should not lay waste their powers in exchange for getting and spending. Notes that careful budget management is a necessary virtue, but it is not a sufficient virtue to win additional support. Suggests what to take to an annual budget hearing. (SG)

  3. California Budget Simulation

    ERIC Educational Resources Information Center

    Mallinson, Daniel J.

    2018-01-01

    The California Budget Challenge produced by Next10 provides a useful and intuitive tool for instructors to introduce students to public budgeting. Students will reason through a series of budgeting decisions using information provided on the fiscal and practical implications of their choices. The Challenge is updated with each budget cycle, so it…

  4. School District Budgeting and Student Achievement

    ERIC Educational Resources Information Center

    Burckbuchler, Scott Alan

    2009-01-01

    Public education is the cornerstone of a working, progressive, democratic society. Therefore, it matters where education dollars are spent. Budgeting decisions take on added significance in light of fulfilling the objectives of the No Child Left Behind Act, which is characterized as the most far-reaching piece of education legislation in decades.…

  5. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  6. Using C to build a satellite scheduling expert system: Examples from the Explorer platform planning system

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Tuchman, Alan; Potter, William J.

    1991-01-01

    Recently, many expert systems were developed in a LISP environment and then ported to the real world C environment before the final system is delivered. This situation may require that the entire system be completely rewritten in C and may actually result in a system which is put together as quickly as possible with little regard for maintainability and further evolution. With the introduction of high performance UNIX and X-windows based workstations, a great deal of the advantages of developing a first system in the LISP environment have become questionable. A C-based AI development effort is described which is based on a software tools approach with emphasis on reusability and maintainability of code. The discussion starts with simple examples of how list processing can easily be implemented in C and then proceeds to the implementations of frames and objects which use dynamic memory allocation. The implementation of procedures which use depth first search, constraint propagation, context switching and a blackboard-like simulation environment are described. Techniques for managing the complexity of C-based AI software are noted, especially the object-oriented techniques of data encapsulation and incremental development. Finally, all these concepts are put together by describing the components of planning software called the Planning And Resource Reasoning (PARR) shell. This shell was successfully utilized for scheduling services of the Tracking and Data Relay Satellite System for the Earth Radiation Budget Satellite since May 1987 and will be used for operations scheduling of the Explorer Platform in November 1991.

  7. Knowledge-based scheduling of arrival aircraft

    NASA Technical Reports Server (NTRS)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  8. Multi-objective problem of the modified distributed parallel machine and assembly scheduling problem (MDPMASP) with eligibility constraints

    NASA Astrophysics Data System (ADS)

    Amallynda, I.; Santosa, B.

    2017-11-01

    This paper proposes a new generalization of the distributed parallel machine and assembly scheduling problem (DPMASP) with eligibility constraints referred to as the modified distributed parallel machine and assembly scheduling problem (MDPMASP) with eligibility constraints. Within this generalization, we assume that there are a set non-identical factories or production lines, each one with a set unrelated parallel machine with different speeds in processing them disposed to a single assembly machine in series. A set of different products that are manufactured through an assembly program of a set of components (jobs) according to the requested demand. Each product requires several kinds of jobs with different sizes. Beside that we also consider to the multi-objective problem (MOP) of minimizing mean flow time and the number of tardy products simultaneously. This is known to be NP-Hard problem, is important to practice, as the former criterions to reflect the customer's demand and manufacturer's perspective. This is a realistic and complex problem with wide range of possible solutions, we propose four simple heuristics and two metaheuristics to solve it. Various parameters of the proposed metaheuristic algorithms are discussed and calibrated by means of Taguchi technique. All proposed algorithms are tested by Matlab software. Our computational experiments indicate that the proposed problem and fourth proposed algorithms are able to be implemented and can be used to solve moderately-sized instances, and giving efficient solutions, which are close to optimum in most cases.

  9. Scheduling nurses’ shifts at PGI Cikini Hospital

    NASA Astrophysics Data System (ADS)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  10. SARDA Surface Schedulers

    NASA Technical Reports Server (NTRS)

    Malik, Waqar

    2016-01-01

    Provide an overview of algorithms used in SARDA (Spot and Runway Departure Advisor) HITL (Human-in-the-Loop) simulation for Dallas Fort-Worth International Airport and Charlotte Douglas International airport. Outline a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the single runway scheduling (SRS) problem, and discuss heuristics to restrict the search space for the DP based algorithm and provide improvements.

  11. Some single-machine scheduling problems with learning effects and two competing agents.

    PubMed

    Li, Hongjie; Li, Zeyuan; Yin, Yunqiang

    2014-01-01

    This study considers a scheduling environment in which there are two agents and a set of jobs, each of which belongs to one of the two agents and its actual processing time is defined as a decreasing linear function of its starting time. Each of the two agents competes to process its respective jobs on a single machine and has its own scheduling objective to optimize. The objective is to assign the jobs so that the resulting schedule performs well with respect to the objectives of both agents. The objective functions addressed in this study include the maximum cost, the total weighted completion time, and the discounted total weighted completion time. We investigate three problems arising from different combinations of the objectives of the two agents. The computational complexity of the problems is discussed and solution algorithms where possible are presented.

  12. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  13. Prescribed Travel Schedules for Fatigue Management

    NASA Technical Reports Server (NTRS)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  14. Multi-criteria evaluation methods in the production scheduling

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Krenczyk, D.; Paprocka, I.; Kempa, W.; Grabowik, C.

    2016-08-01

    The paper presents a discussion on the practical application of different methods of multi-criteria evaluation in the process of scheduling in manufacturing systems. Among the methods two main groups are specified: methods based on the distance function (using metacriterion) and methods that create a Pareto set of possible solutions. The basic criteria used for scheduling were also described. The overall procedure of evaluation process in production scheduling was presented. It takes into account the actions in the whole scheduling process and human decision maker (HDM) participation. The specified HDM decisions are related to creating and editing a set of evaluation criteria, selection of multi-criteria evaluation method, interaction in the searching process, using informal criteria and making final changes in the schedule for implementation. According to need, process scheduling may be completely or partially automated. Full automatization is possible in case of metacriterion based objective function and if Pareto set is selected - the final decision has to be done by HDM.

  15. Design Principles and Algorithms for Air Traffic Arrival Scheduling

    NASA Technical Reports Server (NTRS)

    Erzberger, Heinz; Itoh, Eri

    2014-01-01

    This report presents design principles and algorithms for building a real-time scheduler of arrival aircraft based on a first-come-first-served (FCFS) scheduling protocol. The algorithms provide the conceptual and computational foundation for the Traffic Management Advisor (TMA) of the Center/terminal radar approach control facilities (TRACON) automation system, which comprises a set of decision support tools for managing arrival traffic at major airports in the United States. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high-altitude airspace far away from the airport and low-altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time. This report is a revision of an earlier paper first presented as part of an Advisory Group for Aerospace Research and Development (AGARD) lecture series in September 1995. The authors, during vigorous discussions over the details of this paper, felt it was important to the air-trafficmanagement (ATM) community to revise and extend the original 1995 paper, providing more detail and clarity and thereby allowing future researchers to understand this foundational work as the basis for the TMA's scheduling algorithms.

  16. Budget brief, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-01-01

    The FY DOE budge totals $12.6 billion in budget authority and $11.1 billion in budget outlays. The budget authority being requested consists of $10.3 billion in new authority and a $2.3 billion reappropriation of expiring funds for the Strategic Petroleum Reserve. Areas covered in the Energy budget are: energy conservation; research, development, and applications; regulation and information; direct energy production; strategic energy production; and energy security reserve. Other areas include: general science, defense activities; departmental administration; and legislative proposal - spent fuel. Budget totals are compared for 1980 and 1981. A detailed discussion of the FY 1981 activities to bemore » undertaken to carry out these activities is provided. (MCW)« less

  17. Computerized Budget Monitoring.

    ERIC Educational Resources Information Center

    Stein, Julian U.; Rowe, Joe N.

    1989-01-01

    This article discusses the importance of budget monitoring in fiscal management; describes ways in which computerized budget monitoring increases accuracy, efficiency, and flexibility; outlines steps in the budget process; and presents sample reports, generated using the Lotus 1-2-3 spreadsheet and graphics program. (IAH)

  18. Dynamic Appliances Scheduling in Collaborative MicroGrids System

    PubMed Central

    Bilil, Hasnae; Aniba, Ghassane; Gharavi, Hamid

    2017-01-01

    In this paper a new approach which is based on a collaborative system of MicroGrids (MG’s), is proposed to enable household appliance scheduling. To achieve this, appliances are categorized into flexible and non-flexible Deferrable Loads (DL’s), according to their electrical components. We propose a dynamic scheduling algorithm where users can systematically manage the operation of their electric appliances. The main challenge is to develop a flattening function calculus (reshaping) for both flexible and non-flexible DL’s. In addition, implementation of the proposed algorithm would require dynamically analyzing two successive multi-objective optimization (MOO) problems. The first targets the activation schedule of non-flexible DL’s and the second deals with the power profiles of flexible DL’s. The MOO problems are resolved by using a fast and elitist multi-objective genetic algorithm (NSGA-II). Finally, in order to show the efficiency of the proposed approach, a case study of a collaborative system that consists of 40 MG’s registered in the load curve for the flattening program has been developed. The results verify that the load curve can indeed become very flat by applying the proposed scheduling approach. PMID:28824226

  19. 7 CFR 3402.14 - Budget and budget narrative.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Budget and budget narrative. 3402.14 Section 3402.14 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE FOOD AND AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM...

  20. 7 CFR 3402.14 - Budget and budget narrative.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Budget and budget narrative. 3402.14 Section 3402.14 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE FOOD AND AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM...

  1. Incremental Scheduling Engines for Human Exploration of the Cosmos

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  2. A bicriteria heuristic for an elective surgery scheduling problem.

    PubMed

    Marques, Inês; Captivo, M Eugénia; Vaz Pato, Margarida

    2015-09-01

    Resource rationalization and reduction of waiting lists for surgery are two main guidelines for hospital units outlined in the Portuguese National Health Plan. This work is dedicated to an elective surgery scheduling problem arising in a Lisbon public hospital. In order to increase the surgical suite's efficiency and to reduce the waiting lists for surgery, two objectives are considered: maximize surgical suite occupation and maximize the number of surgeries scheduled. This elective surgery scheduling problem consists of assigning an intervention date, an operating room and a starting time for elective surgeries selected from the hospital waiting list. Accordingly, a bicriteria surgery scheduling problem arising in the hospital under study is presented. To search for efficient solutions of the bicriteria optimization problem, the minimization of a weighted Chebyshev distance to a reference point is used. A constructive and improvement heuristic procedure specially designed to address the objectives of the problem is developed and results of computational experiments obtained with empirical data from the hospital are presented. This study shows that by using the bicriteria approach presented here it is possible to build surgical plans with very good performance levels. This method can be used within an interactive approach with the decision maker. It can also be easily adapted to other hospitals with similar scheduling conditions.

  3. Contamination Sources Effects Analysis (CSEA) - A Tool to Balance Cost/Schedule While Managing Facility Availability

    NASA Technical Reports Server (NTRS)

    Wilcox, Margaret

    2008-01-01

    A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.

  4. Budget Analysis: Review of the Governor's Proposed Budget, 1999-00.

    ERIC Educational Resources Information Center

    New York State Office of the Comptroller, Albany.

    This report provides an overview of the 1999-2000 executive budget for New York State. The budget calls for $72.7 billion in all funds spending and proposes that a $1.8 billion surplus from the 1998-99 fiscal year be used to fill budget gaps in fiscal years 2000-01 and 2001-02. The report focuses on spending for education, health and social…

  5. Optimal scheduling of micro grids based on single objective programming

    NASA Astrophysics Data System (ADS)

    Chen, Yue

    2018-04-01

    Faced with the growing demand for electricity and the shortage of fossil fuels, how to optimally optimize the micro-grid has become an important research topic to maximize the economic, technological and environmental benefits of the micro-grid. This paper considers the role of the battery and the micro-grid and power grid to allow the exchange of power not exceeding 150kW preconditions, the main study of the economy to load for the goal is to minimize the electricity cost (abandonment of wind), to establish an optimization model, and to solve the problem by genetic algorithm. The optimal scheduling scheme is obtained and the utilization of renewable energy and the impact of the battery involved in regulation are analyzed.

  6. Developing guidance for budget impact analysis.

    PubMed

    Trueman, P; Drummond, M; Hutton, J

    2001-01-01

    The role of economic evaluation in the efficient allocation of healthcare resources has been widely debated. Whilst economic evidence is undoubtedly useful to purchasers, it does not address the issue of affordability which is an increasing concern. Healthcare purchasers are concerned not just with maximising efficiency but also with the more simplistic goal of remaining within their annual budgets. These two objectives are not necessarily consistent. This paper examines the issue of affordability, the relationship between affordability and efficiency and builds the case for why there is a growing need for budget impact models to complement economic evaluation. Guidance currently available for such models is also examined and it is concluded that this guidance is currently insufficient. Some of these insufficiencies are addressed and some thoughts on what constitutes best practice in budget impact modelling are suggested. These suggestions include consideration of transparency, clarity of perspective, reliability of data sources, the relationship between intermediate and final end-points and rates of adoption of new therapies. They also include the impact of intervention by population subgroups or indications, reporting of results, probability of re-deploying resources, the time horizon, exploring uncertainty and sensitivity analysis, and decision-maker access to the model. Due to the nature of budget impact models, the paper does not deliver stringent methodological guidance on modelling. The intention was to provide some suggestions of best practice in addition to some foundations upon which future research can build.

  7. Intercell scheduling: A negotiation approach using multi-agent coalitions

    NASA Astrophysics Data System (ADS)

    Tian, Yunna; Li, Dongni; Zheng, Dan; Jia, Yunde

    2016-10-01

    Intercell scheduling problems arise as a result of intercell transfers in cellular manufacturing systems. Flexible intercell routes are considered in this article, and a coalition-based scheduling (CBS) approach using distributed multi-agent negotiation is developed. Taking advantage of the extended vision of the coalition agents, the global optimization is improved and the communication cost is reduced. The objective of the addressed problem is to minimize mean tardiness. Computational results show that, compared with the widely used combinatorial rules, CBS provides better performance not only in minimizing the objective, i.e. mean tardiness, but also in minimizing auxiliary measures such as maximum completion time, mean flow time and the ratio of tardy parts. Moreover, CBS is better than the existing intercell scheduling approach for the same problem with respect to the solution quality and computational costs.

  8. Who needs budgets?

    PubMed

    Hope, Jeremy; Fraser, Robin

    2003-02-01

    Budgeting, as most corporations practice it, should be abolished. That may sound radical, but doing so would further companies' long-running efforts to transform themselves into developed networks that can nimbly adjust to market conditions. Most other building blocks are in place, but companies continue to restrict themselves by relying on inflexible budget processes and the command-and-control culture that budgeting entails. A number of companies have rejected the foregone conclusions embedded in budgets, and they've given up the self-interested wrangling over what the data indicate. In the absence of budgets, alternative goals and measures--some financial, such as cost-to-income ratios, and some nonfinancial, such as time to market-move to the foreground. Companies that have rejected budgets require employees to measure themselves against the performance of competitors and against internal peer groups. Because employees don't know whether they've succeeded until they can look back on the results of a given period, they must use every ounce of energy to ensure that they beat the competition. A key feature of many companies that have rejected budgets is the use of rolling forecasts, which are created every few months and typically cover five to eight quarters. Because the forecasts are regularly revised, they allow companies to continuously adapt to market conditions. The forecasting practices of two such companies, both based in Sweden, are examined in detail: the bank Svenska Handelsbanken and the wholesaler Ahlsell. Though the first companies to reject budgets were located in Northern Europe, organizations that have gone beyond budgeting can be found in a range of countries and industries. Their practices allow them to unleash the power of today's management tools and realize the potential of a fully decentralized organization.

  9. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  10. Routing and Scheduling Algorithms for WirelessHART Networks: A Survey

    PubMed Central

    Nobre, Marcelo; Silva, Ivanovitch; Guedes, Luiz Affonso

    2015-01-01

    Wireless communication is a trend nowadays for the industrial environment. A number of different technologies have emerged as solutions satisfying strict industrial requirements (e.g., WirelessHART, ISA100.11a, WIA-PA). As the industrial environment presents a vast range of applications, adopting an adequate solution for each case is vital to obtain good performance of the system. In this context, the routing and scheduling schemes associated with these technologies have a direct impact on important features, like latency and energy consumption. This situation has led to the development of a vast number of routing and scheduling schemes. In the present paper, we focus on the WirelessHART technology, emphasizing its most important routing and scheduling aspects in order to guide both end users and the developers of new algorithms. Furthermore, we provide a detailed literature review of the newest routing and scheduling techniques for WirelessHART, discussing each of their features. These routing algorithms have been evaluated in terms of their objectives, metrics, the usage of the WirelessHART structures and validation method. In addition, the scheduling algorithms were also evaluated by metrics, validation, objectives and, in addition, by multiple superframe support, as well as by the redundancy method used. Moreover, this paper briefly presents some insights into the main WirelessHART simulation modules available, in order to provide viable test platforms for the routing and scheduling algorithms. Finally, some open issues in WirelessHART routing and scheduling algorithms are discussed. PMID:25919371

  11. Budgeting Approaches in Community Colleges

    ERIC Educational Resources Information Center

    Palmer, James C.

    2014-01-01

    Several budgeting approaches have been initiated as alternatives to the traditional, incremental process. These include formula budgeting; zero-base budgeting; planning, programming, and budgeting systems; and responsibility center budgeting. Each is premised on assumptions about how organizations might best make resource allocation decisions.…

  12. Cost-efficient scheduling of FAST observations

    NASA Astrophysics Data System (ADS)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  13. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  14. Artificial Immune Algorithm for Subtask Industrial Robot Scheduling in Cloud Manufacturing

    NASA Astrophysics Data System (ADS)

    Suma, T.; Murugesan, R.

    2018-04-01

    The current generation of manufacturing industry requires an intelligent scheduling model to achieve an effective utilization of distributed manufacturing resources, which motivated us to work on an Artificial Immune Algorithm for subtask robot scheduling in cloud manufacturing. This scheduling model enables a collaborative work between the industrial robots in different manufacturing centers. This paper discussed two optimizing objectives which includes minimizing the cost and load balance of industrial robots through scheduling. To solve these scheduling problems, we used the algorithm based on Artificial Immune system. The parameters are simulated with MATLAB and the results compared with the existing algorithms. The result shows better performance than existing.

  15. Budgeting Time to Teach about the School Budget

    ERIC Educational Resources Information Center

    Weiss, Dale

    2011-01-01

    As a teacher in the Milwaukee Public Schools (MPS) for the past 16 years, the author has grown used to dismal budget cut news arriving each February. Although cuts are always frustrating and their results burdensome, the school has been able to "hang on" reasonably well. This year, however, the budget cuts were extreme. In this article,…

  16. Strategic Budgeting.

    ERIC Educational Resources Information Center

    Jones, Dennis P.

    1993-01-01

    An approach to college budgeting that encompasses strategic as well as operational decisions is proposed. Strategic decisions focus on creation and maintenance of institutional capacity, whereas operational decisions focus on use of that capacity to accomplish specific purposes. Strategic budgeting must emphasize institutional assets and their…

  17. Improving Hospital-wide Patient Scheduling Decisions by Clinical Pathway Mining.

    PubMed

    Gartner, Daniel; Arnolds, Ines V; Nickel, Stefan

    2015-01-01

    Recent research has highlighted the need for solving hospital-wide patient scheduling problems. Inpatient scheduling, patient activities have to be scheduled on scarce hospital resources such that temporal relations between activities (e.g. for recovery times) are ensured. Common objectives are, among others, the minimization of the length of stay (LOS). In this paper, we consider a hospital-wide patient scheduling problem with LOS minimization based on uncertain clinical pathways. We approach the problem in three stages: First, we learn most likely clinical pathways using a sequential pattern mining approach. Second, we provide a mathematical model for patient scheduling and finally, we combine the two approaches. In an experimental study carried out using real-world data, we show that our approach outperforms baseline approaches on two metrics.

  18. Home - House Budget Committee

    Science.gov Websites

    Initiatives Hearings Full Menu About Toggle Links Members History Staff Rules & Budget Law News Toggle Staff Rules & Budget Law News Press Releases Budget Digests HBC Publications Op-Eds Speeches &

  19. Nambe Pueblo Water Budget and Forecasting model.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brainard, James Robert

    2009-10-01

    This report documents The Nambe Pueblo Water Budget and Water Forecasting model. The model has been constructed using Powersim Studio (PS), a software package designed to investigate complex systems where flows and accumulations are central to the system. Here PS has been used as a platform for modeling various aspects of Nambe Pueblo's current and future water use. The model contains three major components, the Water Forecast Component, Irrigation Scheduling Component, and the Reservoir Model Component. In each of the components, the user can change variables to investigate the impacts of water management scenarios on future water use. The Watermore » Forecast Component includes forecasting for industrial, commercial, and livestock use. Domestic demand is also forecasted based on user specified current population, population growth rates, and per capita water consumption. Irrigation efficiencies are quantified in the Irrigated Agriculture component using critical information concerning diversion rates, acreages, ditch dimensions and seepage rates. Results from this section are used in the Water Demand Forecast, Irrigation Scheduling, and the Reservoir Model components. The Reservoir Component contains two sections, (1) Storage and Inflow Accumulations by Categories and (2) Release, Diversion and Shortages. Results from both sections are derived from the calibrated Nambe Reservoir model where historic, pre-dam or above dam USGS stream flow data is fed into the model and releases are calculated.« less

  20. Dypas: A dynamic payload scheduler for shuttle missions

    NASA Technical Reports Server (NTRS)

    Davis, Stephen

    1988-01-01

    Decision and analysis systems have had broad and very practical application areas in the human decision making process. These software systems range from the help sections in simple accounting packages, to the more complex computer configuration programs. Dypas is a decision and analysis system that aids prelaunch shutlle scheduling, and has added functionality to aid the rescheduling done in flight. Dypas is written in Common Lisp on a Symbolics Lisp machine. Dypas differs from other scheduling programs in that it can draw its knowledge from different rule bases and apply them to different rule interpretation schemes. The system has been coded with Flavors, an object oriented extension to Common Lisp on the Symbolics hardware. This allows implementation of objects (experiments) to better match the problem definition, and allows a more coherent solution space to be developed. Dypas was originally developed to test a programmer's aptitude toward Common Lisp and the Symbolics software environment. Since then the system has grown into a large software effort with several programmers and researchers thrown into the effort. Dypas is currently using two expert systems and three inferencing procedures to generate a many object schedule. The paper will review the abilities of Dypas and comment on its functionality.

  1. Phase I Design for Completely or Partially Ordered Treatment Schedules

    PubMed Central

    Wages, Nolan A.; O’Quigley, John; Conaway, Mark R.

    2013-01-01

    The majority of methods for the design of Phase I trials in oncology are based upon a single course of therapy, yet in actual practice it may be the case that there is more than one treatment schedule for any given dose. Therefore, the probability of observing a dose-limiting toxicity (DLT) may depend upon both the total amount of the dose given, as well as the frequency with which it is administered. The objective of the study then becomes to find an acceptable combination of both dose and schedule. Past literature on designing these trials has entailed the assumption that toxicity increases monotonically with both dose and schedule. In this article, we relax this assumption for schedules and present a dose-schedule finding design that can be generalized to situations in which we know the ordering between all schedules and those in which we do not. We present simulation results that compare our method to other suggested dose-schedule finding methodology. PMID:24114957

  2. Budget impact and cost-utility analysis of universal infant rotavirus vaccination in Spain.

    PubMed

    Imaz, Iñaki; Rubio, Beltrán; Cornejo, Ana M; González-Enríquez, Jesús

    2014-04-01

    Rotavirus is not included in the Spanish mass infant vaccination schedule but has also not been economically evaluated for its inclusion. We analysed cost-utility of the universal infant rotavirus vaccination using RotaTeq® versus no vaccination in Spain. We also carried out a budget impact analysis and determined the effect on results of different variables introduced in the model. A deterministic Markov model was built considering loss of quality of life for children and their parents, and introducing direct and indirect costs updated to 2011. The introduction of the vaccination using RotaTeq® as a universal infant vaccination would increase the annual health care budget in 10.43 million euro and would result in a gain of an additional Quality Adjusted Life Year at a cost of 280,338€ from the healthcare system perspective and 210,167€ from the societal perspective. The model was stable to variable modifications. To sum up, according to our model and estimates, the introduction of a universal infant rotavirus vaccination with RotaTeq® in Spain would cause a large impact on the health care budget and would not be efficient unless significant variations in vaccine price, vaccine efficacy and/or utilities took place. Copyright © 2013 Elsevier Inc. All rights reserved.

  3. Application of decentralized cooperative problem solving in dynamic flexible scheduling

    NASA Astrophysics Data System (ADS)

    Guan, Zai-Lin; Lei, Ming; Wu, Bo; Wu, Ya; Yang, Shuzi

    1995-08-01

    The object of this study is to discuss an intelligent solution to the problem of task-allocation in shop floor scheduling. For this purpose, the technique of distributed artificial intelligence (DAI) is applied. Intelligent agents (IAs) are used to realize decentralized cooperation, and negotiation is realized by using message passing based on the contract net model. Multiple agents, such as manager agents, workcell agents, and workstation agents, make game-like decisions based on multiple criteria evaluations. This procedure of decentralized cooperative problem solving makes local scheduling possible. And by integrating such multiple local schedules, dynamic flexible scheduling for the whole shop floor production can be realized.

  4. Bi-Objective Modelling for Hazardous Materials Road–Rail Multimodal Routing Problem with Railway Schedule-Based Space–Time Constraints

    PubMed Central

    Sun, Yan; Lang, Maoxiang; Wang, Danzhu

    2016-01-01

    The transportation of hazardous materials is always accompanied by considerable risk that will impact public and environment security. As an efficient and reliable transportation organization, a multimodal service should participate in the transportation of hazardous materials. In this study, we focus on transporting hazardous materials through the multimodal service network and explore the hazardous materials multimodal routing problem from the operational level of network planning. To formulate this problem more practicably, minimizing the total generalized costs of transporting the hazardous materials and the social risk along the planned routes are set as the optimization objectives. Meanwhile, the following formulation characteristics will be comprehensively modelled: (1) specific customer demands; (2) multiple hazardous material flows; (3) capacitated schedule-based rail service and uncapacitated time-flexible road service; and (4) environmental risk constraint. A bi-objective mixed integer nonlinear programming model is first built to formulate the routing problem that combines the formulation characteristics above. Then linear reformations are developed to linearize and improve the initial model so that it can be effectively solved by exact solution algorithms on standard mathematical programming software. By utilizing the normalized weighted sum method, we can generate the Pareto solutions to the bi-objective optimization problem for a specific case. Finally, a large-scale empirical case study from the Beijing–Tianjin–Hebei Region in China is presented to demonstrate the feasibility of the proposed methods in dealing with the practical problem. Various scenarios are also discussed in the case study. PMID:27483294

  5. Affirmative Action: The Scheduled Castes and the Scheduled Tribes.

    ERIC Educational Resources Information Center

    Sivaramayya, B.

    This paper considers Indian affirmative action policies that provide reservations (quotas) in favor of two disadvantaged groups, the scheduled castes and the scheduled tribes. First, definitions and background are presented. The scheduled castes ("untouchables") are said to suffer from social segregation, and the scheduled tribes from…

  6. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1..., Deductions, etc. (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per...

  7. Solving cyclical nurse scheduling problem using preemptive goal programming

    NASA Astrophysics Data System (ADS)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  8. Schedule and status of irradiation experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-09-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has one irradiation experiment in reactor and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  9. Planning, scheduling, and control for automatic telescopes

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Swanson, Keith; Philips, Andy; Levinson, Rich; Bresina, John

    1992-01-01

    This paper presents an argument for the appropriateness of Entropy Reduction Engine (ERE) technology to the planning, scheduling, and control components of Automatic Photoelectric Telescope (APT) management. The paper is organized as follows. In the next section, we give a brief summary of the planning and scheduling requirements for APTs. Following this, in section 3, we give an ERE project precis, couched primarily in terms of project objectives. Section 4 gives a sketch of the match-up between problem and technology, and section 5 outlines where we want to go with this work.

  10. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents.

    PubMed

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T

    2016-02-01

    Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012-2013 academic year. The 4 metrics of schedule quality that were compared between the 2010-2011 and 2012-2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs.

  11. Teaching the Federal Budget, National Debt, and Budget Deficit: Findings from High School Teachers

    ERIC Educational Resources Information Center

    Marri, Anand R.; Ahn, Meesuk; Crocco, Margaret Smith; Grolnick, Maureen; Gaudelli, William; Walker, Erica N.

    2011-01-01

    The issues surrounding the federal budget, national debt, and budget deficit are complex, but not beyond the reach of young students. This study finds scant treatment of the federal budget, national debt, and budget deficit in high schools today. It is hardly surprising that high school teachers spend so little time discussing these topics in…

  12. [HAS budget impact analysis guidelines: A new decision-making tool].

    PubMed

    Ghabri, Salah; Poullié, Anne-Isabelle; Autin, Erwan; Josselin, Jean-Michel

    2017-10-02

    Budget impact analysis (BIA) provides short and medium-term estimates on changes in budgets and resources resulting from the adoption of new health interventions. The objective of this article is to present the main messages of the newly developed French National Authority for Health (HAS) guidelines on budget impact analysis : issues, recommendations and perspectives. The HAS guidelines development process was based on data derived from a literature review on BIA (search dates : January 2000 to June 2016), an HAS retrospective investigation, a public consultation, international expert advice, and approval from the HAS Board and the Economic and Public Health Evaluation Committee. Based on its research findings, HAS developed its first BIA guidelines, which include recommendations on the following topics : BIA definition, perspective, populations, time horizon, compared scenarios, budget impact models, costing, discounting, choice of clinical data, reporting of results and uncertainty analysis. The HAS BIA guidelines are expected to enhance the usefulness of BIA as an essential part of a comprehensive economic assessment of healthcare interventions, which itself includes cost-effectiveness analysis and equity of access to healthcare.

  13. Optimal radiotherapy dose schedules under parametric uncertainty

    NASA Astrophysics Data System (ADS)

    Badri, Hamidreza; Watanabe, Yoichi; Leder, Kevin

    2016-01-01

    We consider the effects of parameter uncertainty on the optimal radiation schedule in the context of the linear-quadratic model. Our interest arises from the observation that if inter-patient variability in normal and tumor tissue radiosensitivity or sparing factor of the organs-at-risk (OAR) are not accounted for during radiation scheduling, the performance of the therapy may be strongly degraded or the OAR may receive a substantially larger dose than the allowable threshold. This paper proposes a stochastic radiation scheduling concept to incorporate inter-patient variability into the scheduling optimization problem. Our method is based on a probabilistic approach, where the model parameters are given by a set of random variables. Our probabilistic formulation ensures that our constraints are satisfied with a given probability, and that our objective function achieves a desired level with a stated probability. We used a variable transformation to reduce the resulting optimization problem to two dimensions. We showed that the optimal solution lies on the boundary of the feasible region and we implemented a branch and bound algorithm to find the global optimal solution. We demonstrated how the configuration of optimal schedules in the presence of uncertainty compares to optimal schedules in the absence of uncertainty (conventional schedule). We observed that in order to protect against the possibility of the model parameters falling into a region where the conventional schedule is no longer feasible, it is required to avoid extremal solutions, i.e. a single large dose or very large total dose delivered over a long period. Finally, we performed numerical experiments in the setting of head and neck tumors including several normal tissues to reveal the effect of parameter uncertainty on optimal schedules and to evaluate the sensitivity of the solutions to the choice of key model parameters.

  14. The impact of alternative pricing methods for drugs in California Workers' Compensation System: Fee-schedule pricing.

    PubMed

    Wilson, Leslie; Turkistani, Fatema A; Huang, Wei; Tran, Dang M; Lin, Tracy Kuo

    2018-01-01

    California's Workers' Compensation System (CAWCS) Department of Industrial Relations questioned the adequacy of the current Medi-Cal fee-schedule pricing and requested analysis of alternatives that maximize price availability and maintain budget neutrality. To compare CAWCS pharmacy-dispensed (PD) drug prices under alternative fee schedules, and identify combinations of alternative benchmarks that have prices available for the largest percentage of PD drugs and that best reach budget neutrality. Claims transaction-level data (2011-2013) from CAWCS were used to estimate total annual PD pharmaceutical payments. Medi-Cal pricing data was from the Workman's Compensation Insurance System (WCIS). Average Wholesale Prices (AWP), Wholesale Acquisition Costs (WAC), Direct Prices (DP), Federal Upper Limit (FUL) prices, and National Average Drug Acquisition Costs (NADAC) were from Medi-Span. We matched National Drug Codes (NDCs), pricing dates, and drug quantity for comparisons. We report pharmacy-dispensed (PD) claims frequency, reimbursement matching rate, and paid costs by CAWCS as the reference price against all alternative price benchmarks. Of 12,529,977 CAWCS claims for pharmaceutical products 11.6% (1,462,814) were for PD drugs. Prescription drug cost for CAWCS was over $152M; $63.9M, $47.9M, and $40.6M in 2011-2013. Ninety seven percent of these CAWCS PD claims had a Medi-Cal price. Alternative mechanisms provided a price for fewer claims; NADAC 94.23%, AWP 90.94%, FUL 73.11%, WAC 66.98%, and DP 14.33%. Among CAWCS drugs with no Medi-Cal price in PD claims, AWP, WAC, NADAC, DP, and FUL provided prices for 96.7%, 63.14%, 24.82%, 20.83%, and 15.08% of claims. Overall CAWCS paid 100.52% of Medi-Cal, 60% of AWP, 97% of WAC, 309.53% of FUL, 103.83% of DP, and 136.27% of NADAC. CAWCS current Medi-Cal fee-schedule price list for PD drugs is more complete than all alternative fee-schedules. However, all reimbursement approaches would require combinations of pricing benchmarks

  15. Planning as a Precursor to Scheduling for Space Station Payload Operations

    NASA Technical Reports Server (NTRS)

    Howell, Eric; Maxwell, Theresa

    1995-01-01

    Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

  16. Research on schedulers for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Colome, Josep; Colomer, Pau; Guàrdia, Josep; Ribas, Ignasi; Campreciós, Jordi; Coiffard, Thierry; Gesa, Lluis; Martínez, Francesc; Rodler, Florian

    2012-09-01

    The main task of a scheduler applied to astronomical observatories is the time optimization of the facility and the maximization of the scientific return. Scheduling of astronomical observations is an example of the classical task allocation problem known as the job-shop problem (JSP), where N ideal tasks are assigned to M identical resources, while minimizing the total execution time. A problem of higher complexity, called the Flexible-JSP (FJSP), arises when the tasks can be executed by different resources, i.e. by different telescopes, and it focuses on determining a routing policy (i.e., which machine to assign for each operation) other than the traditional scheduling decisions (i.e., to determine the starting time of each operation). In most cases there is no single best approach to solve the planning system and, therefore, various mathematical algorithms (Genetic Algorithms, Ant Colony Optimization algorithms, Multi-Objective Evolutionary algorithms, etc.) are usually considered to adapt the application to the system configuration and task execution constraints. The scheduling time-cycle is also an important ingredient to determine the best approach. A shortterm scheduler, for instance, has to find a good solution with the minimum computation time, providing the system with the capability to adapt the selected task to varying execution constraints (i.e., environment conditions). We present in this contribution an analysis of the task allocation problem and the solutions currently in use at different astronomical facilities. We also describe the schedulers for three different projects (CTA, CARMENES and TJO) where the conclusions of this analysis are applied to develop a suitable routine.

  17. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    PubMed

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  18. Artificial intelligence techniques for scheduling Space Shuttle missions

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.

    1994-01-01

    Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.

  19. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R [Livermore, CA; Eckert, Philip D [Livermore, CA; Hommes, Gregg [Pleasanton, CA

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  20. Understanding the Budget Battle.

    ERIC Educational Resources Information Center

    Hritz, Townley

    1996-01-01

    Describes Head Start's financial uncertainty for the future due to the government's budget battle. Presents information on the key points in the budget process, how that process got off track in fiscal year 1996, the resulting government shutdowns, and how Head Start can prepare for the 1997 budget debates. (MOK)

  1. Budget cuts.

    PubMed

    1996-05-31

    The House of Representatives approved a Federal budget for fiscal 1997. The budget calls for cutting $1.5 billion from the current $23 billion budget for the Department of Health and Human Services (DHHS). Only half of the DHHS money goes to the National Institutes of Health, whose research programs were expected to remain intact. DHHS programs, such as the Ryan White CARE Act and prevention programs run by the Centers for Disease Control and Prevention (CDC) are likely to bear the brunt of the cuts. The House Veterans Affairs/Housing and Urban Development appropriations bill will be reviewed during the week of June 3, 1996. The Senate envisions a $1.5 billion reduction in DHHS programs, although the action is not final.

  2. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  3. 42 CFR 457.140 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Budget. 457.140 Section 457.140 Public Health... Child Health Insurance Programs and Outreach Strategies § 457.140 Budget. The State plan, or plan amendment that has a significant impact on the approved budget, must include a budget that describes the...

  4. Integrated scheduling and resource management. [for Space Station Information System

    NASA Technical Reports Server (NTRS)

    Ward, M. T.

    1987-01-01

    This paper examines the problem of integrated scheduling during the Space Station era. Scheduling for Space Station entails coordinating the support of many distributed users who are sharing common resources and pursuing individual and sometimes conflicting objectives. This paper compares the scheduling integration problems of current missions with those anticipated for the Space Station era. It examines the facilities and the proposed operations environment for Space Station. It concludes that the pattern of interdependecies among the users and facilities, which are the source of the integration problem is well structured, allowing a dividing of the larger problem into smaller problems. It proposes an architecture to support integrated scheduling by scheduling efficiently at local facilities as a function of dependencies with other facilities of the program. A prototype is described that is being developed to demonstrate this integration concept.

  5. Advance Appropriations: A Needless and Confusing Education Budget Technique. Federal Education Budget Project

    ERIC Educational Resources Information Center

    Delisle, Jason

    2007-01-01

    This report argues that advance appropriations serve no functional purpose for schools, but they create a loss of transparency, comparability, and simplicity in federal education budgeting. It allocates spending before future budgets have been established. The approach was originally used to skirt spending limits and budget procedures in place…

  6. Passive Optical Link Budget for LEO Space Surveillance

    NASA Astrophysics Data System (ADS)

    Wagner, P.; Hasenohr, T.; Hampf, D.; Sproll, F.; Humbert, L.; Rodmann, J.; Riede, W.

    The rising space debris population is becoming an increasing risk for space assets. Even objects with the size of 10mm can cause major damages to active spacecraft. Especially the orbits around 800km high are densely populated with space debris objects. To assess the risk of collisions with active satellites, the Earth orbits need to be surveyed permanently. Space debris laser ranging systems for example can deliver highly accurate positional data for precise orbit determination. Therefor a priori information about the objects coarse trajectory is needed. Such initial orbit information can be provided by wide angle optical sensors. The Institute of Technical Physics at the German Aerospace Center in Stuttgart runs an observatory to perform passive as well as laser optical measurements to LEO objects. In order to detect unknown objects, a wide-angle imaging system with a field of view in the range of 5° to 15° equipped with an astronomical CCD camera and a commercial off the shelf (COTS) lens was designed to continuously observe the night sky for LEO objects. This paper presents the passive optical link budget for observing LEO objects to show the benefits and limits of the physical performance of an optical surveillance system. A compact COTS system is able to detect objects with a couple of decimeters in size while a large aperture telescope can detect objects with diameters below 10cm. Additionally, data captured by a passive optical staring system with a 10 cm aperture was analyzed. It is shown that 90% of all objects with a radar cross section larger than 2m² are detected with such a system during twilight conditions. The smallest detected LEO object with this system has a size of 0.32m x 0.32m x 0.26m. These measurements are compared to the developed link budget which allows an estimation of the performance of larger systems.

  7. Baseline budgeting for continuous improvement.

    PubMed

    Kilty, G L

    1999-05-01

    This article is designed to introduce the techniques used to convert traditionally maintained department budgets to baseline budgets. This entails identifying key activities, evaluating for value-added, and implementing continuous improvement opportunities. Baseline Budgeting for Continuous Improvement was created as a result of a newly named company president's request to implement zero-based budgeting. The president was frustrated with the mind-set of the organization, namely, "Next year's budget should be 10 to 15 percent more than this year's spending." Zero-based budgeting was not the answer, but combining the principles of activity-based costing and the Just-in-Time philosophy of eliminating waste and continuous improvement did provide a solution to the problem.

  8. Reform of Budgeting for Acquisition: Lessons from Private Sector Capital Budgeting for the Department of Defense

    DTIC Science & Technology

    2006-04-30

    Åèìáëáíáçå= oÉëÉ~êÅÜ=póãéçëáìã= REFORM OF BUDGETING FOR ACQUISITION: LESSONS FROM PRIVATE SECTOR CAPITAL BUDGETING FOR THE DEPARTMENT OF DEFENSE...TITLE AND SUBTITLE Reform of Budgeting for Acquisition: Lessons from Private Sector Capital Budgeting for the Department of Defense 5a. CONTRACT...Reform of Budgeting for Acquisition: Lessons from Private Sector Capital Budgeting for the Department of Defense Presenter: Jerry McCaffery, PhD, serves

  9. Estimating hydrologic budgets for six Persian Gulf watersheds, Iran

    NASA Astrophysics Data System (ADS)

    Hosseini, Majid; Ghafouri, Mohammad; Tabatabaei, MahmoudReza; Goodarzi, Masoud; Mokarian, Zeinab

    2017-10-01

    Estimation of the major components of the hydrologic budget is important for determining the impacts on the water supply and quality of either planned or proposed land management projects, vegetative changes, groundwater withdrawals, and reservoir management practices and plans. As acquisition of field data is costly and time consuming, models have been created to test various land use practices and their concomitant effects on the hydrologic budget of watersheds. To simulate such management scenarios realistically, a model should be able to simulate the individual components of the hydrologic budget. The main objective of this study is to perform the SWAT2012 model for estimation of hydrological budget in six subbasin of Persian Gulf watershed; Golgol, Baghan, Marghab Shekastian, Tangebirim and Daragah, which are located in south and south west of Iran during 1991-2009. In order to evaluate the performance of the model, hydrological data, soil map, land use map and digital elevation model (DEM) are obtained and prepared for each catchment to run the model. SWAT-CUP with SUFI2 program was used for simulation, uncertainty and validation with 95 Percent Prediction Uncertainty. Coefficient of determination ( R 2) and Nash-Sutcliffe coefficient (NS) were used for evaluation of the model simulation results. Comparison of measured and predicted values demonstrated that each component of the model gave reasonable output and that the interaction among components was realistic. The study has produced a technique with reliable capability for annual and monthly water budget components in Persian Gulf watershed.

  10. The relationship between budget allocated and budget utilized of faculties in an academic institution

    NASA Astrophysics Data System (ADS)

    Aziz, Wan Noor Hayatie Wan Abdul; Aziz, Rossidah Wan Abdul; Shuib, Adibah; Razi, Nor Faezah Mohamad

    2014-06-01

    Budget planning enables an organization to set priorities towards achieving certain goals and to identify the highest priorities to be accomplished with the available funds, thus allowing allocation of resources according to the set priorities and constraints. On the other hand, budget execution and monitoring enables allocated funds or resources to be utilized as planned. Our study concerns with investigating the relationship between budget allocation and budget utilization of faculties in a public university in Malaysia. The focus is on the university's operations management financial allocation and utilization based on five categories which are emolument expenditure, academic or services and supplies expenditure, maintenance expenditure, student expenditure and others expenditure. The analysis on financial allocation and utilization is performed based on yearly quarters. Data collected include three years faculties' budget allocation and budget utilization performance involving a sample of ten selected faculties of a public university in Malaysia. Results show that there are positive correlation and significant relationship between quarterly budget allocation and quarterly budget utilization. This study found that emolument give the highest contribution to the total allocation and total utilization for all quarters. This paper presents some findings based on statistical analysis conducted which include descriptive statistics and correlation analysis.

  11. 13 CFR 130.460 - Budget justification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Budget justification. 130.460... CENTERS § 130.460 Budget justification. The SBDC Director, as a part of the renewal application, or the... submit to the SBA Project Officer the budget justification for the upcoming budget period. The budget...

  12. CQPSO scheduling algorithm for heterogeneous multi-core DAG task model

    NASA Astrophysics Data System (ADS)

    Zhai, Wenzheng; Hu, Yue-Li; Ran, Feng

    2017-07-01

    Efficient task scheduling is critical to achieve high performance in a heterogeneous multi-core computing environment. The paper focuses on the heterogeneous multi-core directed acyclic graph (DAG) task model and proposes a novel task scheduling method based on an improved chaotic quantum-behaved particle swarm optimization (CQPSO) algorithm. A task priority scheduling list was built. A processor with minimum cumulative earliest finish time (EFT) was acted as the object of the first task assignment. The task precedence relationships were satisfied and the total execution time of all tasks was minimized. The experimental results show that the proposed algorithm has the advantage of optimization abilities, simple and feasible, fast convergence, and can be applied to the task scheduling optimization for other heterogeneous and distributed environment.

  13. Sensibility study in a flexible job shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Curralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo

    2013-10-01

    This paper proposes the impact assessment of the jobs order in the optimal time of operations in a Flexible Job Shop Scheduling Problem. In this work a real assembly cell was studied: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France, which is considered as a Flexible Job Shop problem. The problem consists in finding the machines operations schedule, taking into account the precedence constraints. The main objective is to minimize the batch makespan, i.e. the finish time of the last operation completed in the schedule. Shortly, the present study consists in evaluating if the jobs order affects the optimal time of the operations schedule. The genetic algorithm was used to solve the optimization problem. As a conclusion, it's assessed that the jobs order influence the optimal time.

  14. Optimizing an F-16 Squadron Weekly Pilot Schedule for the Turkish Air Force

    DTIC Science & Technology

    2010-03-01

    disrupted schedules are rescheduled , minimizing the total number of changes with respect to the previous schedule’s objective function. Output...producing rosters for a nursing staff in a large general hospital (Dowsland, 1998) and afterwards Aickelin and Dowsland use an Indirect Genetic...algorithm to improve the solutions of the nurse scheduling problem which is similar to the fighter squadron pilot scheduling problem (Aickelin and

  15. Trade-offs and efficiencies in optimal budget-constrained multispecies corridor networks.

    PubMed

    Dilkina, Bistra; Houtman, Rachel; Gomes, Carla P; Montgomery, Claire A; McKelvey, Kevin S; Kendall, Katherine; Graves, Tabitha A; Bernstein, Richard; Schwartz, Michael K

    2017-02-01

    Conservation biologists recognize that a system of isolated protected areas will be necessary but insufficient to meet biodiversity objectives. Current approaches to connecting core conservation areas through corridors consider optimal corridor placement based on a single optimization goal: commonly, maximizing the movement for a target species across a network of protected areas. We show that designing corridors for single species based on purely ecological criteria leads to extremely expensive linkages that are suboptimal for multispecies connectivity objectives. Similarly, acquiring the least-expensive linkages leads to ecologically poor solutions. We developed algorithms for optimizing corridors for multispecies use given a specific budget. We applied our approach in western Montana to demonstrate how the solutions may be used to evaluate trade-offs in connectivity for 2 species with different habitat requirements, different core areas, and different conservation values under different budgets. We evaluated corridors that were optimal for each species individually and for both species jointly. Incorporating a budget constraint and jointly optimizing for both species resulted in corridors that were close to the individual species movement-potential optima but with substantial cost savings. Our approach produced corridors that were within 14% and 11% of the best possible corridor connectivity for grizzly bears (Ursus arctos) and wolverines (Gulo gulo), respectively, and saved 75% of the cost. Similarly, joint optimization under a combined budget resulted in improved connectivity for both species relative to splitting the budget in 2 to optimize for each species individually. Our results demonstrate economies of scale and complementarities conservation planners can achieve by optimizing corridor designs for financial costs and for multiple species connectivity jointly. We believe that our approach will facilitate corridor conservation by reducing acquisition costs

  16. Trade-offs and efficiencies in optimal budget-constrained multispecies corridor networks

    USGS Publications Warehouse

    Dilkina, Bistra; Houtman, Rachel; Gomes, Carla P.; Montgomery, Claire A.; McKelvey, Kevin; Kendall, Katherine; Graves, Tabitha A.; Bernstein, Richard; Schwartz, Michael K.

    2017-01-01

    Conservation biologists recognize that a system of isolated protected areas will be necessary but insufficient to meet biodiversity objectives. Current approaches to connecting core conservation areas through corridors consider optimal corridor placement based on a single optimization goal: commonly, maximizing the movement for a target species across a network of protected areas. We show that designing corridors for single species based on purely ecological criteria leads to extremely expensive linkages that are suboptimal for multispecies connectivity objectives. Similarly, acquiring the least-expensive linkages leads to ecologically poor solutions. We developed algorithms for optimizing corridors for multispecies use given a specific budget. We applied our approach in western Montana to demonstrate how the solutions may be used to evaluate trade-offs in connectivity for 2 species with different habitat requirements, different core areas, and different conservation values under different budgets. We evaluated corridors that were optimal for each species individually and for both species jointly. Incorporating a budget constraint and jointly optimizing for both species resulted in corridors that were close to the individual species movement-potential optima but with substantial cost savings. Our approach produced corridors that were within 14% and 11% of the best possible corridor connectivity for grizzly bears (Ursus arctos) and wolverines (Gulo gulo), respectively, and saved 75% of the cost. Similarly, joint optimization under a combined budget resulted in improved connectivity for both species relative to splitting the budget in 2 to optimize for each species individually. Our results demonstrate economies of scale and complementarities conservation planners can achieve by optimizing corridor designs for financial costs and for multiple species connectivity jointly. We believe that our approach will facilitate corridor conservation by reducing acquisition costs

  17. An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

    NASA Technical Reports Server (NTRS)

    Garcia, Christopher; Rabadi, Ghaith

    2010-01-01

    Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

  18. 77 FR 64848 - Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... 1120S, Schedule D, Schedule K-1, and Schedule M-3 AGENCY: Internal Revenue Service (IRS), Treasury... (Loss) Reconciliation for S Corporations With Total Assets of $10 Million or More, and Schedule K-1... Corporation, Schedule D (Form 1120S), Capital Gains and Losses and Built-in Gains, Schedule K-1 (Form 1120S...

  19. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  20. Public Budgeting: The Compromises Among the Sound Budgeting Principles in Contingency Funding

    DTIC Science & Technology

    2017-06-01

    sound decisions (including the full financial costs and benefits of the budget decisions, and the impacts thereof) and be made accessible to all...is also seen when all relevant data and costs projections result, in a timely manner, in a budget document that is accessible by the public . A medium...include all relevant data and costs projections, and makes information accessible to the public for review in a timely manner. The budget

  1. Scheduling Results for the THEMIS Observation Scheduling Tool

    NASA Technical Reports Server (NTRS)

    Mclaren, David; Rabideau, Gregg; Chien, Steve; Knight, Russell; Anwar, Sadaat; Mehall, Greg; Christensen, Philip

    2011-01-01

    We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

  2. On the role of budget sufficiency, cost efficiency, and uncertainty in species management

    USGS Publications Warehouse

    van der Burg, Max Post; Bly, Bartholomew B.; Vercauteren, Tammy; Grand, James B.; Tyre, Andrew J.

    2014-01-01

    Many conservation planning frameworks rely on the assumption that one should prioritize locations for management actions based on the highest predicted conservation value (i.e., abundance, occupancy). This strategy may underperform relative to the expected outcome if one is working with a limited budget or the predicted responses are uncertain. Yet, cost and tolerance to uncertainty rarely become part of species management plans. We used field data and predictive models to simulate a decision problem involving western burrowing owls (Athene cunicularia hypugaea) using prairie dog colonies (Cynomys ludovicianus) in western Nebraska. We considered 2 species management strategies: one maximized abundance and the other maximized abundance in a cost-efficient way. We then used heuristic decision algorithms to compare the 2 strategies in terms of how well they met a hypothetical conservation objective. Finally, we performed an info-gap decision analysis to determine how these strategies performed under different budget constraints and uncertainty about owl response. Our results suggested that when budgets were sufficient to manage all sites, the maximizing strategy was optimal and suggested investing more in expensive actions. This pattern persisted for restricted budgets up to approximately 50% of the sufficient budget. Below this budget, the cost-efficient strategy was optimal and suggested investing in cheaper actions. When uncertainty in the expected responses was introduced, the strategy that maximized abundance remained robust under a sufficient budget. Reducing the budget induced a slight trade-off between expected performance and robustness, which suggested that the most robust strategy depended both on one's budget and tolerance to uncertainty. Our results suggest that wildlife managers should explicitly account for budget limitations and be realistic about their expected levels of performance.

  3. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  4. Multi-Satellite Observation Scheduling for Large Area Disaster Emergency Response

    NASA Astrophysics Data System (ADS)

    Niu, X. N.; Tang, H.; Wu, L. X.

    2018-04-01

    an optimal imaging plan, plays a key role in coordinating multiple satellites to monitor the disaster area. In the paper, to generate imaging plan dynamically according to the disaster relief, we propose a dynamic satellite task scheduling method for large area disaster response. First, an initial robust scheduling scheme is generated by a robust satellite scheduling model in which both the profit and the robustness of the schedule are simultaneously maximized. Then, we use a multi-objective optimization model to obtain a series of decomposing schemes. Based on the initial imaging plan, we propose a mixed optimizing algorithm named HA_NSGA-II to allocate the decomposing results thus to obtain an adjusted imaging schedule. A real disaster scenario, i.e., 2008 Wenchuan earthquake, is revisited in terms of rapid response using satellite resources and used to evaluate the performance of the proposed method with state-of-the-art approaches. We conclude that our satellite scheduling model can optimize the usage of satellite resources so as to obtain images in disaster response in a more timely and efficient manner.

  5. Interference Cognizant Network Scheduling

    NASA Technical Reports Server (NTRS)

    Hall, Brendan (Inventor); Bonk, Ted (Inventor); DeLay, Benjamin F. (Inventor); Varadarajan, Srivatsan (Inventor); Smithgall, William Todd (Inventor)

    2017-01-01

    Systems and methods for interference cognizant network scheduling are provided. In certain embodiments, a method of scheduling communications in a network comprises identifying a bin of a global timeline for scheduling an unscheduled virtual link, wherein a bin is a segment of the timeline; identifying a pre-scheduled virtual link in the bin; and determining if the pre-scheduled and unscheduled virtual links share a port. In certain embodiments, if the unscheduled and pre-scheduled virtual links don't share a port, scheduling transmission of the unscheduled virtual link to overlap with the scheduled transmission of the pre-scheduled virtual link; and if the unscheduled and pre-scheduled virtual links share a port: determining a start time delay for the unscheduled virtual link based on the port; and scheduling transmission of the unscheduled virtual link in the bin based on the start time delay to overlap part of the scheduled transmission of the pre-scheduled virtual link.

  6. Applying mathematical models to predict resident physician performance and alertness on traditional and novel work schedules.

    PubMed

    Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P

    2016-09-13

    In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid

  7. From non-preemptive to preemptive scheduling using synchronization synthesis.

    PubMed

    Černý, Pavol; Clarke, Edmund M; Henzinger, Thomas A; Radhakrishna, Arjun; Ryzhyk, Leonid; Samanta, Roopsha; Tarrach, Thorsten

    2017-01-01

    We present a computer-aided programming approach to concurrency. The approach allows programmers to program assuming a friendly, non-preemptive scheduler, and our synthesis procedure inserts synchronization to ensure that the final program works even with a preemptive scheduler. The correctness specification is implicit, inferred from the non-preemptive behavior. Let us consider sequences of calls that the program makes to an external interface. The specification requires that any such sequence produced under a preemptive scheduler should be included in the set of sequences produced under a non-preemptive scheduler. We guarantee that our synthesis does not introduce deadlocks and that the synchronization inserted is optimal w.r.t. a given objective function. The solution is based on a finitary abstraction, an algorithm for bounded language inclusion modulo an independence relation, and generation of a set of global constraints over synchronization placements. Each model of the global constraints set corresponds to a correctness-ensuring synchronization placement. The placement that is optimal w.r.t. the given objective function is chosen as the synchronization solution. We apply the approach to device-driver programming, where the driver threads call the software interface of the device and the API provided by the operating system. Our experiments demonstrate that our synthesis method is precise and efficient. The implicit specification helped us find one concurrency bug previously missed when model-checking using an explicit, user-provided specification. We implemented objective functions for coarse-grained and fine-grained locking and observed that different synchronization placements are produced for our experiments, favoring a minimal number of synchronization operations or maximum concurrency, respectively.

  8. Collection Evaluation and Acquisition Budgets: A Kaleidoscope in the Making.

    ERIC Educational Resources Information Center

    Osburn, Charles B.

    1992-01-01

    Discusses library collection evaluation and its relationship to the acquisitions budget. Topics addressed include the publishing industry; library services that are more user centered; acquisition of versus access to sources of information and knowledge; the concept of value; library accountability; objectives and setting priorities; and levels of…

  9. Particle swarm optimization based space debris surveillance network scheduling

    NASA Astrophysics Data System (ADS)

    Jiang, Hai; Liu, Jing; Cheng, Hao-Wen; Zhang, Yao

    2017-02-01

    The increasing number of space debris has created an orbital debris environment that poses increasing impact risks to existing space systems and human space flights. For the safety of in-orbit spacecrafts, we should optimally schedule surveillance tasks for the existing facilities to allocate resources in a manner that most significantly improves the ability to predict and detect events involving affected spacecrafts. This paper analyzes two criteria that mainly affect the performance of a scheduling scheme and introduces an artificial intelligence algorithm into the scheduling of tasks of the space debris surveillance network. A new scheduling algorithm based on the particle swarm optimization algorithm is proposed, which can be implemented in two different ways: individual optimization and joint optimization. Numerical experiments with multiple facilities and objects are conducted based on the proposed algorithm, and simulation results have demonstrated the effectiveness of the proposed algorithm.

  10. Budget goal commitment, clinical managers' use of budget information and performance.

    PubMed

    Macinati, Manuela S; Rizzo, Marco G

    2014-08-01

    Despite the importance placed on accounting as a means to influence performance in public healthcare, there is still a lot to be learned about the role of management accounting in clinical managers' work behavior and their link with organizational performance. The article aims at analyzing the motivational role of budgetary participation and the intervening role of individuals' mental states and behaviors in influencing the relationship between budgetary participation and performance. According to the goal-setting theory, SEM technique was used to test the relationships among variables. The data were collected by a survey conducted in an Italian hospital. The results show that: (i) budgetary participation does not directly influence the use of budget information, but the latter is encouraged by the level of budget goal commitment which, as a result, is influenced by the positive motivational consequences of participative budgeting; (ii) budget goal commitment does not directly influence performance, but the relationship is mediated by the use of budget information. This study contributes to health policy and management accounting literature and has significant policy implications. Mainly, the findings prove that the introduction of business-like techniques in the healthcare sector can improve performance if attitudinal and behavioral variables are adequately stimulated. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  11. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  12. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    PubMed

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  13. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  14. Beyond carbon budgets

    NASA Astrophysics Data System (ADS)

    Peters, Glen P.

    2018-06-01

    The remaining carbon budget consistent with limiting warming to 1.5 °C allows 20 more years of current emissions according to one study, but is already exhausted according to another. Both are defensible. We need to move on from a unique carbon budget, and face the nuances.

  15. Two-machine flow shop scheduling integrated with preventive maintenance planning

    NASA Astrophysics Data System (ADS)

    Wang, Shijin; Liu, Ming

    2016-02-01

    This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.

  16. Discrete Optimization Model for Vehicle Routing Problem with Scheduling Side Cosntraints

    NASA Astrophysics Data System (ADS)

    Juliandri, Dedy; Mawengkang, Herman; Bu'ulolo, F.

    2018-01-01

    Vehicle Routing Problem (VRP) is an important element of many logistic systems which involve routing and scheduling of vehicles from a depot to a set of customers node. This is a hard combinatorial optimization problem with the objective to find an optimal set of routes used by a fleet of vehicles to serve the demands a set of customers It is required that these vehicles return to the depot after serving customers’ demand. The problem incorporates time windows, fleet and driver scheduling, pick-up and delivery in the planning horizon. The goal is to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the overall costs of all routes over the planning horizon. We model the problem as a linear mixed integer program. We develop a combination of heuristics and exact method for solving the model.

  17. Model Error Budgets

    NASA Technical Reports Server (NTRS)

    Briggs, Hugh C.

    2008-01-01

    An error budget is a commonly used tool in design of complex aerospace systems. It represents system performance requirements in terms of allowable errors and flows these down through a hierarchical structure to lower assemblies and components. The requirements may simply be 'allocated' based upon heuristics or experience, or they may be designed through use of physics-based models. This paper presents a basis for developing an error budget for models of the system, as opposed to the system itself. The need for model error budgets arises when system models are a principle design agent as is increasingly more common for poorly testable high performance space systems.

  18. Design Your Own Budget: A Case Study Based on the 1988 Budget.

    ERIC Educational Resources Information Center

    Williams, Paul

    1992-01-01

    Presents a classroom activity in which students work in groups to develop a national budget. Requires students to consider economic factors such as inflation, unemployment, and taxation. Includes charts and a national budget work sheet. (CFR)

  19. 36 CFR 1210.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... may, at its option, restrict the transfer of funds among direct cost categories or programs, functions... or the objective of the project or program (even if there is no associated budget revision requiring... funds allotted for training allowances (direct payment to trainees) to other categories of expense. (8...

  20. Safety and Immunogenicity of Sequential Rotavirus Vaccine Schedules

    PubMed Central

    Libster, Romina; McNeal, Monica; Walter, Emmanuel B.; Shane, Andi L.; Winokur, Patricia; Cress, Gretchen; Berry, Andrea A.; Kotloff, Karen L.; Sarpong, Kwabena; Turley, Christine B.; Harrison, Christopher J.; Pahud, Barbara A.; Marbin, Jyothi; Dunn, John; El-Khorazaty, Jill; Barrett, Jill

    2016-01-01

    BACKGROUND AND OBJECTIVES: Although both licensed rotavirus vaccines are safe and effective, it is often not possible to complete the schedule by using the same vaccine formulation. The goal of this study was to investigate the noninferiority of the immune responses to the 2 licensed rotavirus vaccines when administered as a mixed schedule compared with administering a single vaccine formulation alone. METHODS: Randomized, multicenter, open-label study. Healthy infants (6–14 weeks of age) were randomized to receive rotavirus vaccines in 1 of 5 different schedules (2 using a single vaccine for all doses, and 3 using mixed schedules). The group receiving only the monovalent rotavirus vaccine received 2 doses of vaccine and the other 4 groups received 3 doses of vaccine. Serum for immunogenicity testing was obtained 1 month after the last vaccine dose and the proportion of seropositive children (rotavirus immunoglobulin A ≥20 U/mL) were compared in all the vaccine groups. RESULTS: Between March 2011 and September 2013, 1393 children were enrolled and randomized. Immune responses to all the sequential mixed vaccine schedules were shown to be noninferior when compared with the 2 single vaccine reference groups. The proportion of children seropositive to at least 1 vaccine antigen at 1 month after vaccination ranged from 77% to 96%, and was not significantly different among all the study groups. All schedules were well tolerated. CONCLUSIONS: Mixed schedules are safe and induced comparable immune responses when compared with the licensed rotavirus vaccines given alone. PMID:26823540

  1. Soft Budget Constraints in Public Hospitals.

    PubMed

    Wright, Donald J

    2016-05-01

    A soft budget constraint arises when a government is unable to commit to not 'bailout' a public hospital if the public hospital exhausts its budget before the end of the budget period. It is shown that if the political costs of a 'bailout' are relatively small, then the public hospital exhausts the welfare-maximising budget before the end of the budget period and a 'bailout' occurs. In anticipation, the government offers a budget to the public hospital that may be greater than or less than the welfare-maximising budget. In either case, the public hospital treats 'too many' elective patients before the 'bailout' and 'too few' after. The introduction of a private hospital reduces the size of any 'bailout' and increases welfare. Copyright © 2015 John Wiley & Sons, Ltd.

  2. Cycle-Based Budgeting Toolkit: A Primer

    ERIC Educational Resources Information Center

    Yan, Bo

    2016-01-01

    At the core, budgeting is about distributing and redistributing limited financial resources for continuous improvement. Incremental budgeting is limited in achieving the goal due to lack of connection between outcomes and budget decisions. Zero-based budgeting fills the gap, but is cumbersome to implement, especially for large urban school…

  3. 25 CFR 276.14 - Budget revision.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Budget revision. 276.14 Section 276.14 Indians BUREAU OF... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS § 276.14 Budget revision. Criteria and procedures to be followed by grantees in reporting deviations from grant budgets and requesting approval for budget...

  4. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  5. Autonomous Hybrid Priority Queueing for Scheduling Residential Energy Demands

    NASA Astrophysics Data System (ADS)

    Kalimullah, I. Q.; Shamroukh, M.; Sahar, N.; Shetty, S.

    2017-05-01

    The advent of smart grid technologies has opened up opportunities to manage the energy consumption of the users within a residential smart grid system. Demand response management is particularly being employed to reduce the overall load on an electricity network which could in turn reduce outages and electricity costs. The objective of this paper is to develop an intelligible scheduler to optimize the energy available to a micro grid through hybrid queueing algorithm centered around the consumers’ energy demands. This is achieved by shifting certain schedulable load appliances to light load hours. Various factors such as the type of demand, grid load, consumers’ energy usage patterns and preferences are considered while formulating the logical constraints required for the algorithm. The algorithm thus obtained is then implemented in MATLAB workspace to simulate its execution by an Energy Consumption Scheduler (ECS) found within smart meters, which automatically finds the optimal energy consumption schedule tailor made to fit each consumer within the micro grid network.

  6. 7 CFR 906.33 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 906.33 Section 906.33 Agriculture Regulations... GRANDE VALLEY IN TEXAS Order Regulating Handling Expenses and Assessments § 906.33 Budget. At the... budget of income and expenditures necessary for the administration of this part. The committee shall...

  7. The GBT Dynamic Scheduling System: A New Scheduling Paradigm

    NASA Astrophysics Data System (ADS)

    O'Neil, K.; Balser, D.; Bignell, C.; Clark, M.; Condon, J.; McCarty, M.; Marganian, P.; Shelton, A.; Braatz, J.; Harnett, J.; Maddalena, R.; Mello, M.; Sessoms, E.

    2009-09-01

    The Robert C. Byrd Green Bank Telescope (GBT) is implementing a new Dynamic Scheduling System (DSS) designed to maximize the observing efficiency of the telescope while ensuring that none of the flexibility and ease of use of the GBT is harmed and that the data quality of observations is not adversely affected. To accomplish this, the GBT DSS is implementing a dynamic scheduling system which schedules observers, rather than running scripts. The DSS works by breaking each project into one or more sessions which have associated observing criteria such as RA, Dec, and frequency. Potential observers may also enter dates when members of their team will not be available for either on-site or remote observing. The scheduling algorithm uses those data, along with the predicted weather, to determine the most efficient schedule for the GBT. The DSS provides all observers at least 24 hours notice of their upcoming observing. In the uncommon (< 20%) case where the actual weather does not match the predictions, a backup project, chosen from the database, is run instead. Here we give an overview of the GBT DSS project, including the ranking and scheduling algorithms for the sessions, the scheduling probabilities generation, the web framework for the system, and an overview of the results from the beta testing which were held from June - September, 2008.

  8. Discrete harmony search algorithm for scheduling and rescheduling the reprocessing problems in remanufacturing: a case study

    NASA Astrophysics Data System (ADS)

    Gao, Kaizhou; Wang, Ling; Luo, Jianping; Jiang, Hua; Sadollah, Ali; Pan, Quanke

    2018-06-01

    In this article, scheduling and rescheduling problems with increasing processing time and new job insertion are studied for reprocessing problems in the remanufacturing process. To handle the unpredictability of reprocessing time, an experience-based strategy is used. Rescheduling strategies are applied for considering the effect of increasing reprocessing time and the new subassembly insertion. To optimize the scheduling and rescheduling objective, a discrete harmony search (DHS) algorithm is proposed. To speed up the convergence rate, a local search method is designed. The DHS is applied to two real-life cases for minimizing the maximum completion time and the mean of earliness and tardiness (E/T). These two objectives are also considered together as a bi-objective problem. Computational optimization results and comparisons show that the proposed DHS is able to solve the scheduling and rescheduling problems effectively and productively. Using the proposed approach, satisfactory optimization results can be achieved for scheduling and rescheduling on a real-life shop floor.

  9. 7 CFR 1744.64 - Budget adjustment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Budget adjustment. 1744.64 Section 1744.64... Disbursement of Funds § 1744.64 Budget adjustment. (a) If more funds are required than are available in a budget account, the borrower may request RUS's approval of a budget adjustment to use funds from another...

  10. The WCRP/GEWEX Surface Radiation Budget Project Release 2: An Assessment of Surface Fluxes at 1 Degree Resolution

    NASA Technical Reports Server (NTRS)

    Stackhouse, P. W., Jr.; Gupta, S. K.; Cox, S. J.; Chiacchio, M.; Mikovitz, J. C.

    2004-01-01

    The U.S. National Aeronautics and Space Administration (NASA) based Surface Radiation Budget (SRB) Project in association with the World Climate Research Programme Global Energy and Water Cycle Experiment (WCRP/GEWEX) is preparing a new 1 deg x 1 deg horizontal resolution product for distribution scheduled for release in early 2001. The new release contains several significant upgrades from the previous version. This paper summarizes the most significant upgrades and presents validation results as an assessment of the new data set.

  11. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.

  12. The Faculty Role in Budgeting.

    ERIC Educational Resources Information Center

    Meisinger, Richard J., Jr.; Dubeck, Leroy W.

    1984-01-01

    Specific roles faculty members can play in their institution's budget processes are discussed, and the general ends served by budgets are identified. Each of the dimensions of institutional character (e.g., size, mission) determines the ways in which participants in budgeting will interact. For example, broader faculty participation in budgeting…

  13. 7 CFR 956.41 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 956.41 Section 956.41 Agriculture Regulations... OF SOUTHEAST WASHINGTON AND NORTHEAST OREGON Expenses and Assessments § 956.41 Budget. Prior to each fiscal period and as may be necessary thereafter, the committee shall prepare an estimated budget of...

  14. 7 CFR 958.41 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 958.41 Section 958.41 Agriculture Regulations... Budget. Prior to each fiscal period, and as may be necessary thereafter the committee shall prepare a budget of estimated income and expenditures necessary for the administration of this part. The committee...

  15. 7 CFR 948.76 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 948.76 Section 948.76 Agriculture Regulations... Regulating Handling Expenses and Assessments § 948.76 Budget. As soon as practicable after the beginning of... budget of income and expenditures necessary for its administration of this part. Each area committee may...

  16. 7 CFR 959.41 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 959.41 Section 959.41 Agriculture Regulations... Handling Expenses and Assessments § 959.41 Budget. As soon as practicable after the beginning of each fiscal period and as may be necessary thereafter, the committee shall prepare an estimated budget of...

  17. 7 CFR 966.41 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 966.41 Section 966.41 Agriculture Regulations... Handling Expenses and Assessments § 966.41 Budget. At the beginning of each fiscal period and as may be necessary thereafter, the committee shall prepare an estimated budget of income and expenditures necessary...

  18. 7 CFR 945.41 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 945.41 Section 945.41 Agriculture Regulations... COUNTIES IN IDAHO, AND MALHEUR COUNTY, OREGON Order Regulating Handling Budget, Expenses and Assessments § 945.41 Budget. At the beginning of each fiscal period, and as may be necessary thereafter, the...

  19. School Budget Hold'em Facilitator's Guide

    ERIC Educational Resources Information Center

    Education Resource Strategies, 2012

    2012-01-01

    "School Budget Hold'em" is a game designed to help school districts rethink their budgeting process. It evolved out of Education Resource Strategies' (ERS) experience working with large urban districts around the country. "School Budget Hold'em" offers a completely new approach--one that can turn the budgeting process into a long-term visioning…

  20. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  1. Does telephone scheduling assistance increase mammography screening adherence?

    PubMed

    Payton, Colleen A; Sarfaty, Mona; Beckett, Shirley; Campos, Carmen; Hilbert, Kathleen

    2015-11-01

    The 2 objectives were: 1) describe the use of a patient navigation process utilized to promote adherence to mammography screening within a primary care practice, and 2) determine the result of the navigation process and estimate the time required to increase mammography screening with this approach in a commercially insured patient population enrolled in a health maintenance organization. An evaluation of a nonrandomized practice improvement intervention. Women eligible for mammography (n = 298) who did not respond to 2 reminder letters were contacted via telephone by a navigator who offered scheduling assistance for mammography screening. The patient navigator scheduled appointments, documented the number of calls, and confirmed completed mammograms in the electronic health record, as well as estimated the time for calls and chart review. Of the 188 participants reached by phone, 112 (59%) scheduled appointments using the patient navigator, 35 (19%) scheduled their own appointments independently prior to the call, and 41 (22%) declined. As a result of the telephone intervention, 78 of the 188 women reached (41%) received a mammogram; also, all 35 women who had independently scheduled a mammogram received one. Chart documentation confirmed that 113 (38%) of the cohort of 298 women completed a mammogram. The estimated time burden for the entire project was 55 hours and 33 minutes, including calling patients, scheduling appointments, and chart review. A patient navigator can increase mammography adherence in a previously nonadherent population by making the screening appointment while the patient is on the phone.

  2. The TJO-OAdM Robotic Observatory: the scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Casteels, Kevin; Ribas, Ignasi; Francisco, Xavier

    2010-07-01

    The Joan Oró Telescope at the Montsec Astronomical Observatory (TJO - OAdM) is a small-class observatory working under completely unattended control, due to the isolation of the site. Robotic operation is mandatory for its routine use. The level of robotization of an observatory is given by its reliability in responding to environment changes and by the required human interaction due to possible alarms. These two points establish a level of human attendance to ensure low risk at any time. But there is another key point when deciding how the system performs as a robot: the capability to adapt the scheduled observation to actual conditions. The scheduler represents a fundamental element to fully achieve an intelligent response at any time. Its main task is the mid- and short-term time optimization and it has a direct effect on the scientific return achieved by the observatory. We present a description of the scheduler developed for the TJO - OAdM, which is separated in two parts. Firstly, a pre-scheduler that makes a temporary selection of objects from the available projects according to their possibility of observation. This process is carried out before the beginning of the night following different selection criteria. Secondly, a dynamic scheduler that is executed any time a target observation is complete and a new one must be scheduled. The latter enables the selection of the best target in real time according to actual environment conditions and the set of priorities.

  3. Effects of an Advanced Sleep Schedule and Morning Short Wavelength Light Exposure on Circadian Phase in Young Adults with Late Sleep Schedules

    PubMed Central

    Sharkey, Katherine M.; Carskadon, Mary A.; Figueiro, Mariana G.; Zhu, Yong; Rea, Mark S.

    2011-01-01

    Objective We examined the effects of an advanced sleep/wake schedule and morning short wavelength (blue) light in 25 adults (mean age±SD = 21.8±3 years; 13 women) with late sleep schedules and subclinical features of delayed sleep phase syndrome (DSPD). Methods After a baseline week, participants kept individualized, fixed, advanced 7.5-hour sleep schedules for 6 days. Participants were randomly assigned to groups to receive “blue” (470 nm, ~225 lux, n=12) or “dim” (< 1 lux, n=13) light for one hour after waking each day. Head-worn “Daysimeters” measured light exposure; actigraphs and sleep diaries confirmed schedule compliance. Salivary dim light melatonin onset (DLMO), self-reported sleep, and mood were examined with 2×2 ANOVA. Results After 6 days, both groups showed significant circadian phase advances, but morning blue-light was not associated with larger phase shifts than dim-light exposure. The average DLMO advances (mean±SD) were 1.5±1.1 hours in the dim light group and 1.4±0.7 hours in the blue light group. Conclusions Adherence to a fixed advanced sleep/wake schedule resulted in significant circadian phase shifts in young adults with subclinical DSPD with or without morning blue light exposure. Light/dark exposures associated with fixed early sleep schedules are sufficient to advance circadian phase in young adults. PMID:21704557

  4. 24 CFR 968.225 - Budget revisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Budget revisions. 968.225 Section... Fewer Than 250 Units) § 968.225 Budget revisions. (a) A PHA shall not incur any modernization cost in excess of the total HUD-approved CIAP budget. A PHA shall submit a budget revision, in a form prescribed...

  5. Associations between national tuberculosis program budgets and tuberculosis outcomes: an ecological study.

    PubMed

    Chapple, Will; Katz, Alan Roy; Li, Dongmei

    2012-01-01

    The objective of this study is to explore the associations between national tuberculosis program (NTP) budget allocation and tuberculosis related outcomes in the World Health Organization's 22 high burden countries from 2007-2009. This ecological study used mixed effects and generalized estimating equation models to identify independent associations between NTP budget allocations and various tuberculosis related outcomes. Models were adjusted for a number of independent variables previously noted to be associated with tuberculosis incidence. Increasing the percent of the NTP budget for advocacy, communication and social mobilization was associated with an increase in the case detection rate. Increasing TB-HIV funding was associated with an increase in HIV testing among TB patients. Increasing the percent of the population covered by the Directly Observed Therapy (DOT) program was associated with an increase in drug susceptibility testing. Laboratory funding was positively associated with tuberculosis notification. Increasing the budgets for first line drugs, management and multi-drug resistant tuberculosis (MDR-TB) was associated with a decrease in smear positive deaths. Effective TB control is a complex and multifaceted challenge. This study revealed a number of budget allocation related factors associated with improved TB outcome parameters. If confirmed with future longitudinal studies, these findings could help guide NTP managers with allocation decisions.

  6. Associations between national tuberculosis program budgets and tuberculosis outcomes: an ecological study

    PubMed Central

    Chapple, Will; Katz, Alan Roy; Li, Dongmei

    2012-01-01

    Introduction The objective of this study is to explore the associations between national tuberculosis program (NTP) budget allocation and tuberculosis related outcomes in the World Health Organization's 22 high burden countries from 2007–2009. Methods This ecological study used mixed effects and generalized estimating equation models to identify independent associations between NTP budget allocations and various tuberculosis related outcomes. Models were adjusted for a number of independent variables previously noted to be associated with tuberculosis incidence. Results Increasing the percent of the NTP budget for advocacy, communication and social mobilization was associated with an increase in the case detection rate. Increasing TB-HIV funding was associated with an increase in HIV testing among TB patients. Increasing the percent of the population covered by the Directly Observed Therapy (DOT) program was associated with an increase in drug susceptibility testing. Laboratory funding was positively associated with tuberculosis notification. Increasing the budgets for first line drugs, management and multi-drug resistant tuberculosis (MDR-TB) was associated with a decrease in smear positive deaths. Conclusion Effective TB control is a complex and multifaceted challenge. This study revealed a number of budget allocation related factors associated with improved TB outcome parameters. If confirmed with future longitudinal studies, these findings could help guide NTP managers with allocation decisions. PMID:23024825

  7. 7 CFR 955.41 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 955.41 Section 955.41 Agriculture Regulations... Assessments § 955.41 Budget. At least 60 days prior to each fiscal period, or such other date as may be... budget of income and expenditures necessary for the administration of this part. The committee may...

  8. 25 CFR 122.7 - Budget.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Budget. 122.7 Section 122.7 Indians BUREAU OF INDIAN... § 122.7 Budget. (a) By August 1 of each year, the Osage Tribal Education Committee will submit a proposed budget to the Assistant Secretary or to his/her designated representative for formal approval...

  9. Beyond Zero Based Budgeting.

    ERIC Educational Resources Information Center

    Ogden, Daniel M., Jr.

    1978-01-01

    Suggests that the most practical budgeting system for most managers is a formalized combination of incremental and zero-based analysis because little can be learned about most programs from an annual zero-based budget. (Author/IRT)

  10. Politics of the U.S. Federal budget process.

    PubMed

    Elwood, Thomas W

    U.S. Congress members are influenced in three ways: 1) through the acquisition of money to finance political campaigns; 2) by acquiring enough votes to enable them to be reelected; and 3) obtaining expert information on topics of personal interest. Federal spending patterns have a strong impact on the first two items. The ability to funnel money into a congressional district or state provides an excellent opportunity for a legislator to remain in office. Congress often appears to be highly irrational but individual legislators find it in their rational self-interest to behave in ways that are detrimental to the collective interest of Congress as an institution and to the collective good of society. Every year, leaders of both parties begin a legislative session with the intention of producing both a concurrent budget resolution and a set of spending bills according to schedule. Usually, they fail dismally. This article discusses the reasons why such failures tend to occur regularly.

  11. 32 CFR 34.15 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... prior approvals are not required): (i) The transfer of funds among direct cost categories, functions and... or the objective of the project or program (even if there is no associated budget revision requiring... principles for Federal funds and recipients' cost share or match, in § 34.17 and § 34.13, respectively. (iv...

  12. 34 CFR 75.253 - Continuation of a multi-year project after the first budget period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sufficient funds under the program; (2) The recipient has either— (i) Made substantial progress toward meeting the objectives in its approved application; or (ii) Obtained the Secretary's approval of changes... those objectives in succeeding budget periods; (3) The recipient has submitted all reports as required...

  13. Knowledge-Based Scheduling of Arrival Aircraft in the Terminal Area

    NASA Technical Reports Server (NTRS)

    Krzeczowski, K. J.; Davis, T.; Erzberger, H.; Lev-Ram, Israel; Bergh, Christopher P.

    1995-01-01

    A knowledge based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real time simulation. The scheduling system automatically sequences, assigns landing times, and assign runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithm is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reductions, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithm is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper describes the scheduling algorithms, gives examples of their use, and presents data regarding their potential benefits to the air traffic system.

  14. Physician satisfaction with a multi-platform digital scheduling system

    PubMed Central

    Rocha, Leonardo Lima; Lima, Alex Heitor; Santiago, Caroline Reis Maia; Terra, Jose Cláudio Cyrineu; Dagan, Alon; Celi, Leo Anthony

    2017-01-01

    Objective Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation. Methods Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after. Results 51 (77%) of the physicians answered the baseline survey. Of those, 32 (63%) were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70%) of the responders were using more than one method to carry out shift exchanges and only 20 (40%) were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73%) physicians. Forty-eight (98%) of them found the mobile application easy or very easy to install and 47 (96%) did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001). The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001). Conclusion Our web and mobile phone-based scheduling system resulted in better physician satisfaction. PMID:28328958

  15. Radiative Energy Budget Studies Using Observations from the Earth Radiation Budget Experiment (ERBE)

    NASA Technical Reports Server (NTRS)

    Ackerman, Steven A.; Frey, R.; Shie, M.; Olson, R.; Collimore, C.; Friedman, M.

    1997-01-01

    Our research activities under this NASA grant have focused on two broad topics associated with the Earth Radiation Budget Experiment (ERBE): (1) the role of clouds and the surface in modifying the radiative balance; and (2) the spatial and temporal variability of the earth's radiation budget. Each of these broad topics is discussed separately in the text that follows. The major points of the thesis are summarized in section 3 of this report. Other dissertation focuses on deriving the radiation budget over the TOGA COARE region.

  16. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  17. Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

    NASA Technical Reports Server (NTRS)

    Smith, Stephen F.; Pathak, Dhiraj K.

    1991-01-01

    In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

  18. Permanent Shift?: Library Budgets 2010

    ERIC Educational Resources Information Center

    Oder, Norman

    2010-01-01

    It's no surprise that libraries in "LJ"'s annual budget survey reported an overall downward trend, with the expected decline in total budgets some 2.6% and the change in materials budgets 3.5%. Per capita funding is nudging down after years of steady if sometimes modest increases, with a projected decline of 1.6% in FY10. After all, the country…

  19. 43 CFR 1601.0-2 - Objective.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Objective. 1601.0-2 Section 1601.0-2 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Planning § 1601.0-2...

  20. 43 CFR 1601.0-2 - Objective.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Objective. 1601.0-2 Section 1601.0-2 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Planning § 1601.0-2...

  1. 43 CFR 1601.0-2 - Objective.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Objective. 1601.0-2 Section 1601.0-2 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Planning § 1601.0-2...

  2. 43 CFR 1601.0-2 - Objective.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Objective. 1601.0-2 Section 1601.0-2 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Planning § 1601.0-2...

  3. Budget Impact of Enzalutamide for Chemotherapy-Naïve Metastatic Castration-Resistant Prostate Cancer.

    PubMed

    Bui, Cat N; O'Day, Ken; Flanders, Scott; Oestreicher, Nina; Francis, Peter; Posta, Linda; Popelar, Breanna; Tang, Hong; Balk, Mark

    2016-02-01

    Prostate cancer is expected to account for approximately one quarter of all new diagnoses of cancer in American men in 2015. The cost of prostate cancer care is expected to reach $15.1 billion by the year 2020, up from $11.9 billion in 2010. Given the high burden of prostate cancer, health care payers are interested in quantifying the potential budget impact of new therapies. To estimate the budget impact of enzalutamide for the treatment of chemotherapy-naïve metastatic castration-resistant prostate cancer (mCRPC) from a U.S. payer perspective. A model was developed to assess the budget impact of enzalutamide for treatment of chemotherapy-naïve mCRPC patients in a hypothetical 1-million-member U.S. health plan over a 1-year time horizon. Comparators included abiraterone acetate, sipuleucel-T, radium Ra 223 dichloride, and docetaxel. Epidemiologic data, including National Cancer Institute Surveillance, Epidemiology, and End Results (SEER) incidence rates, were used to estimate the number of chemotherapy-naïve mCRPC patients. Dosing, administration, duration of therapy, and adverse event rates were based on package inserts and pivotal studies. Drug costs were obtained from RED BOOK and Centers for Medicare & Medicaid Services (CMS) average sales price pricing files, costs of administration and monitoring from the CMS physician fee schedule, and adverse events from the Agency for Healthcare Research and Quality Healthcare Cost and Utilization Project and published literature. Market shares were estimated for each comparator before and after adoption of enzalutamide. The incremental aggregate budget impact, per patient per year (PPPY), per patient per month (PPPM), and per member per month (PMPM), was calculated. One-way sensitivity analyses were performed. In a population of 115 chemotherapy-naïve mCRPC patients, adopting enzalutamide had an annual incremental budget impact of $510,641 ($4,426 PPPY, $369 PPPM, and $0.04 PMPM). Results were most sensitive to

  4. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  5. Submarine watch schedules: underway evaluation of rotating (contemporary) and compressed (alternative) schedules.

    PubMed

    Duplessis, C A; Miller, J C; Crepeau, L J; Osborn, C M; Dyche, J

    2007-01-01

    With a desire to increase health, cognitive performance effectiveness, and quality of life for submarine watch-standers underway, we performed an evaluation comparing an alternative, compressed-work (ALT) schedule, designed to enhance circadian rhythm entrainment and sleep hygiene, to the contemporary submarine (SUB) forward rotating schedule, aboard the ballistic-missile submarine, USS Henry M. Jackson (SSBN-730 Gold). We assessed a compressed close-6 watch-schedule ("ALT") relative to the existing backward rotating 6-hr on, 12-hr off 18-hr watch schedule ("SUB") employed underway aboard submarines. We monitored 40 subjects' sleep, and temperature and salivary cortisol from 10 of the 40 for approximately two weeks on each respective schedule underway. The cortisol cosinor mesors (midline estimating statistic of rhythm), and amplitudes did not differ significantly between conditions. The temperature cosinor mesors, and the cosinor amplitude were not significantly different, while the cosine curve fit accounted for significantly more variance in the ALT condition than in the SUB condition. The SUB schedule garnered significantly more sleep (7.1 +/- 0.2 hours) than that of the ALTMID schedule (6.3 +/- 0.3 hours). Surveys revealed that 52% of respondents preferred the SUB schedule, 15% preferred the ALT, and 33% were either indifferent or submitted uninterpretable surveys. The ALT schedule was not superior to the existing SUB schedule by physiological or subjective measures and was incompatible to accommodating operational constraints.

  6. Periodic Heterogeneous Vehicle Routing Problem With Driver Scheduling

    NASA Astrophysics Data System (ADS)

    Mardiana Panggabean, Ellis; Mawengkang, Herman; Azis, Zainal; Filia Sari, Rina

    2018-01-01

    The paper develops a model for the optimal management of logistic delivery of a given commodity. The company has different type of vehicles with different capacity to deliver the commodity for customers. The problem is then called Periodic Heterogeneous Vehicle Routing Problem (PHVRP). The goal is to schedule the deliveries according to feasible combinations of delivery days and to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the sum of the costs of all routes over the planning horizon. We propose a combined approach of heuristic algorithm and exact method to solve the problem.

  7. Web Publishing Schedule

    EPA Pesticide Factsheets

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  8. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  9. Effects of Global Budgeting on the Distribution of Dentists and Use of Dental Care in Taiwan

    PubMed Central

    Hsueh, Ya-Seng A; Lee, Shoou-Yih D; Huang, Yu-Tung A

    2004-01-01

    Objective To examine the effects of global budgeting on the distribution of dentists and the use and cost of dental care in Taiwan. Data Sources (1) Monthly dental claim data from January 1996 to December 2001 for the entire insured population in Taiwan. (2) The 1996–2001 population information for the cities, counties and townships in Taiwan, abstracted from the Taiwan-Fukien Demographic Fact Book. Study Design Longitudinal, using the autocorrelation model. Principal Findings Results indicated decline in dental care utilization, particularly after the implementation of dental global budgeting. With few exceptions, dental global budgeting did not improve the distribution of dental care and dentist supply. Conclusions The experience of the dental global budget program in Taiwan suggested that dental global budgeting might contain dental care utilization and that several conditions might have to be met in order for the reimbursement system to have effective redistributive impact on dental care and dentist supply. PMID:15544648

  10. Fiscal Year 2007 Budget Press Conference

    NASA Image and Video Library

    2006-02-06

    NASA Administrator Michael Griffin, seated center, outlines the President's budget for fiscal year 2007 during a news conference, Monday, Feb. 6, 2006, at NASA Headquarters in Washington. The administrator was joined by the heads of NASA's four mission directorates to explain how the proposed $16.8 billion dollar budget supports the Vision for Space Exploration. The budget represents a 3.2% increase above the Fiscal Year 2006 appropriated budget. Photo Credit: (NASA/Bill Ingalls)

  11. Fiscal 1983 Science Budget

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.

    Support for science generally is strong in President Ronald Reagan's fiscal 1983 budget proposal, released last week; agency budgets for the National Oceanic and Atmospheric Administration (NOAA) and the U.S. Geological Survey (USGS), however, did not beat inflation.Total federal funding for research and development and related facilities rose 9.6% to $44.3 billion, beating the 7.3% inflation rate estimated for 1982 by the Office of Management and Budget. Obligations for basic research by various departments and agencies also topped inflation. The President proposes federal funding of $5.82 billion in fiscal 1983, compared with $5.35 billion in 1982.

  12. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  13. Budget Impact Analysis of Veterans Affairs Medical Foster Homes versus Community Living Centers.

    PubMed

    Sutton, Bryce S; Pracht, Étienne; Williams, Arthur R; Alemi, Farrokh; Williams, Allison E; Levy, Cari

    2017-02-01

    The objectives were to determine whether and by what amounts the US Department of Veterans Affairs (VA) use of Medical Foster Homes (MFH) rather than Community Living Centers (CLC) reduced budget impacts to the VA. This was a retrospective, matched, case-control study of veterans residing in MFH or CLC in the VA health care system from 2008 to 2012. Administrative data sets, nearest neighbor matching, generalized linear models, and a secondary analysis were used to capture and analyze budget impacts by veterans who used MFH or CLC exclusively in 2008-2012. Controls of 1483 veterans in CLC were matched to 203 cases of veterans in MFH. Use of MFH instead of CLC reduced budget impacts to the VA by at least $2645 per veteran per month. A secondary analysis of the data using different matching criteria and statistical methods produced similar results, demonstrating the robustness of the estimates of budget impact. When the average out-of-pocket payments made by MFH residents, not made by CLC residents, were included in the analysis, the net reduction of budget impact ranged from $145 to $2814 per veteran per month or a savings of $1740 to $33,768 per veteran per year. Even though outpatient costs of MFH are higher, much of the reduced budget impact of MFH use arises from lower inpatient or hospital costs. Reduced budget impacts on the VA system indicate that expansion of the MFH program may be cost-effective. Implications for further research are suggested.

  14. The DEEP-South: Scheduling and Data Reduction Software System

    NASA Astrophysics Data System (ADS)

    Yim, Hong-Suh; Kim, Myung-Jin; Bae, Youngho; Moon, Hong-Kyu; Choi, Young-Jun; Roh, Dong-Goo; the DEEP-South Team

    2015-08-01

    The DEep Ecliptic Patrol of the Southern sky (DEEP-South), started in October 2012, is currently in test runs with the first Korea Microlensing Telescope Network (KMTNet) 1.6 m wide-field telescope located at CTIO in Chile. While the primary objective for the DEEP-South is physical characterization of small bodies in the Solar System, it is expected to discover a large number of such bodies, many of them previously unknown.An automatic observation planning and data reduction software subsystem called "The DEEP-South Scheduling and Data reduction System" (the DEEP-South SDS) is currently being designed and implemented for observation planning, data reduction and analysis of huge amount of data with minimum human interaction. The DEEP-South SDS consists of three software subsystems: the DEEP-South Scheduling System (DSS), the Local Data Reduction System (LDR), and the Main Data Reduction System (MDR). The DSS manages observation targets, makes decision on target priority and observation methods, schedules nightly observations, and archive data using the Database Management System (DBMS). The LDR is designed to detect moving objects from CCD images, while the MDR conducts photometry and reconstructs lightcurves. Based on analysis made at the LDR and the MDR, the DSS schedules follow-up observation to be conducted at other KMTNet stations. In the end of 2015, we expect the DEEP-South SDS to achieve a stable operation. We also have a plan to improve the SDS to accomplish finely tuned observation strategy and more efficient data reduction in 2016.

  15. Meta-RaPS Algorithm for the Aerial Refueling Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Kaplan, Sezgin; Arin, Arif; Rabadi, Ghaith

    2011-01-01

    The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on multiple tankers (machines). ARSP assumes that jobs have different release times and due dates, The total weighted tardiness is used to evaluate schedule's quality. Therefore, ARSP can be modeled as a parallel machine scheduling with release limes and due dates to minimize the total weighted tardiness. Since ARSP is NP-hard, it will be more appropriate to develop a pproimate or heuristic algorithm to obtain solutions in reasonable computation limes. In this paper, Meta-Raps-ATC algorithm is implemented to create high quality solutions. Meta-RaPS (Meta-heuristic for Randomized Priority Search) is a recent and promising meta heuristic that is applied by introducing randomness to a construction heuristic. The Apparent Tardiness Rule (ATC), which is a good rule for scheduling problems with tardiness objective, is used to construct initial solutions which are improved by an exchanging operation. Results are presented for generated instances.

  16. Colorado Children's Budget 2013

    ERIC Educational Resources Information Center

    Buck, Beverly; Baker, Robin

    2013-01-01

    The "Colorado Children's Budget" presents and analyzes investments and spending trends during the past five state fiscal years on services that benefit children. The "Children's Budget" focuses mainly on state investment and spending, with some analysis of federal investments and spending to provide broader context of state…

  17. [The department budget, in the context of the hospital global budget. Initial results in general medicine].

    PubMed

    Besançon, F

    1984-02-23

    In a general hospital (Hôtel-Dieu, in the center of Paris), run with a global budget, budgets determined for each unit were introduced as an experiment in 1980. Physicians were in charge of certain expenses, mainly: linen, drugs, transportation of patients to and from other hospitals within Paris, and blood fractions. The whole does not exceed 4% of the turnover (FF 20 millions in 1980) of a 67 bed internal medicine unit. Other accounts deal with the stays, admissions, prescriptions of technical acts, laboratory analyses, and X-rays. In 1980, expenses were 11% more than budgeted, but the increase in stays and particularly in admissions was significantly greater. The resulting savings were 8.8% and 18.7% for stays and admissions respectively. Psychic reactions were variable. The subsequent budgets followed the fluctuations of recorded expenses, which were fairly important in both directions. The unit budget may be an advance or a regression, in a restrictive and past-perpetuating context. The coherence between the unit budget and the global hospital budget is questionable. Physicians were willing to take part in accounting and saving. They have good reason for not enlarging their financial responsibilities. Conversely, they may give more attention to diseases of public opinion.

  18. Defense.gov Special Report: 2014 Budget Proposal

    Science.gov Websites

    Department of Defense Submit Search 2014 Fiscal Budget News Stories Bill Provides Military Pay, Bonuses Describe Effects of Budget Uncertainty With assessments ranging from "sobering" to "painful Predicts Bleak Budget Picture Budget pressures mean defense acquisition workers' lives "are going to

  19. Does the benefits schedule of cash assistance programs affect the purchase of temptation goods? Evidence from Peru.

    PubMed

    White, Justin S; Basu, Sanjay

    2016-03-01

    A critique of cash assistance programs is that beneficiaries may spend the money on "temptation goods" such as alcohol and tobacco. We exploit a change in the payment schedule of Peru's conditional cash transfer program to identify the impact of benefit receipt frequency on the purchase of temptation goods. We use annual household data among cross-sectional and panel samples to analyze the effect of the policy change on the share of the household budget devoted to four categories of temptation goods. Using a difference-in-differences estimation approach, we find that larger, less frequent payments increased the expenditure share of alcohol by 55-80% and sweets by 10-40%, although the absolute magnitudes of these effects are small. Our study suggests that less frequent benefits scheduling may lead cash recipients to make certain types of temptation purchases. Copyright © 2016 Elsevier B.V. All rights reserved.

  20. Teaching strategies and student achievement in high school block scheduled biology classes

    NASA Astrophysics Data System (ADS)

    Louden, Cynthia Knapp

    The objectives of this study included determining whether teachers in block or traditionally scheduled biology classes (1) implement inquiry-based instruction more often or with different methods, (2) understand the concept of inquiry-based instruction as it is described in the National Science Standards, (3) have classes with significantly different student achievement, and (4) believe that their school schedule facilitates their use of inquiry-based instruction in the classroom. Biology teachers in block and non-block scheduled classes were interviewed, surveyed, and observed to determine the degree to which they implement inquiry-based instructional practices in their classrooms. State biology exams were used to indicate student achievement. Teachers in block scheduled and traditional classes used inquiry-based instruction with nearly the same frequency. Approximately 30% of all teachers do not understand the concept of inquiry-based instruction as described by the National Science Standards. No significant achievement differences between block and traditionally scheduled biology classes were found using ANCOVA analyses and a nonequivalent control-group quasi-experimental design. Using the same analysis techniques, significant achievement differences were found between biology classes with teachers who used inquiry-based instruction frequently and infrequently. Teachers in block schedules believed that their schedules facilitated inquiry-based instruction more than teachers in traditional schedules.

  1. Laboratory administration--capital budgeting.

    PubMed

    Butros, F

    1997-01-01

    The process of capital budgeting varies among different health-care institutions. Understanding the concept of present value of money, incremental cash flow statements, and the basic budgeting techniques will enable the laboratory manager to make the rational and logical decisions that are needed in today's competitive health-care environment.

  2. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  3. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  4. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  5. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  6. Minimizing metastatic risk in radiotherapy fractionation schedules

    NASA Astrophysics Data System (ADS)

    Badri, Hamidreza; Ramakrishnan, Jagdish; Leder, Kevin

    2015-11-01

    Metastasis is the process by which cells from a primary tumor disperse and form new tumors at distant anatomical locations. The treatment and prevention of metastatic cancer remains an extremely challenging problem. This work introduces a novel biologically motivated objective function to the radiation optimization community that takes into account metastatic risk instead of the status of the primary tumor. In this work, we consider the problem of developing fractionated irradiation schedules that minimize production of metastatic cancer cells while keeping normal tissue damage below an acceptable level. A dynamic programming framework is utilized to determine the optimal fractionation scheme. We evaluated our approach on a breast cancer case using the heart and the lung as organs-at-risk (OAR). For small tumor α /β values, hypo-fractionated schedules were optimal, which is consistent with standard models. However, for relatively larger α /β values, we found the type of schedule depended on various parameters such as the time when metastatic risk was evaluated, the α /β values of the OARs, and the normal tissue sparing factors. Interestingly, in contrast to standard models, hypo-fractionated and semi-hypo-fractionated schedules (large initial doses with doses tapering off with time) were suggested even with large tumor α/β values. Numerical results indicate the potential for significant reduction in metastatic risk.

  7. Earth Radiation Budget Science, 1978. 1: Introduction. [to obtain radiation budget measurements by satellite observation

    NASA Technical Reports Server (NTRS)

    1978-01-01

    An earth radiation budget satellite system (ERBSS) is planned in order to understand climate on various temporal and spatial scales. The system consists of three satellites and is designed to obtain radiation budget data from the earth's surface. Among the topics discussed are the climate modeling and climate diagnostics, the applications of radiation modeling to ERBSS, and the influence of albedo clouds on radiation budget and atmospheric circulation.

  8. Long-Term Effectiveness of Accelerated Hepatitis B Vaccination Schedule in Drug Users

    PubMed Central

    Shah, Dimpy P.; Grimes, Carolyn Z.; Nguyen, Anh T.; Lai, Dejian

    2015-01-01

    Objectives. We demonstrated the effectiveness of an accelerated hepatitis B vaccination schedule in drug users. Methods. We compared the long-term effectiveness of accelerated (0–1–2 months) and standard (0–1–6 months) hepatitis B vaccination schedules in preventing hepatitis B virus (HBV) infections and anti-hepatitis B (anti-HBs) antibody loss during 2-year follow-up in 707 drug users (HIV and HBV negative at enrollment and completed 3 vaccine doses) from February 2004 to October 2009. Results. Drug users in the accelerated schedule group had significantly lower HBV infection rates, but had a similar rate of anti-HBs antibody loss compared with the standard schedule group over 2 years of follow-up. No chronic HBV infections were observed. Hepatitis C positivity at enrollment and age younger than 40 years were independent risk factors for HBV infection and antibody loss, respectively. Conclusions. An accelerated vaccination schedule was more preferable than a standard vaccination schedule in preventing HBV infections in drug users. To overcome the disadvantages of a standard vaccination schedule, an accelerated vaccination schedule should be considered in drug users with low adherence. Our study should be repeated in different cohorts to validate our findings and establish the role of an accelerated schedule in hepatitis B vaccination guidelines for drug users. PMID:25880946

  9. Single-Pass Serial Scheduling Heuristic for Eglin AFB Range Services Division Schedule

    DTIC Science & Technology

    2009-06-01

    scheduling tool for this RCPSP. Research on a schedule improvement metaheuristic and coding of the complete algorithm is required before it can be...a schedule better by applying metaheuristic improvement algorithms to a feasible schedule after it is created. 2.5.1. Greedy Algorithm The...next available position, the algorithm will not utilize all the available range time and manpower. An improvement metaheuristic is required to

  10. 40 CFR 96.140 - State trading budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false State trading budgets. 96.140 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Allowance Allocations § 96.140 State trading budgets. The State trading budgets for annual...

  11. 40 CFR 96.140 - State trading budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false State trading budgets. 96.140 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Allowance Allocations § 96.140 State trading budgets. The State trading budgets for annual...

  12. 40 CFR 96.140 - State trading budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false State trading budgets. 96.140 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Allowance Allocations § 96.140 State trading budgets. The State trading budgets for annual...

  13. 40 CFR 96.140 - State trading budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false State trading budgets. 96.140 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO 2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Allowance Allocations § 96.140 State trading budgets. The State trading budgets for annual...

  14. 40 CFR 96.140 - State trading budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 96.140 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Allowance Allocations § 96.140 State trading budgets. The State trading budgets for annual...

  15. Multi-objective vs. single-objective calibration of a hydrologic model using single- and multi-objective screening

    NASA Astrophysics Data System (ADS)

    Mai, Juliane; Cuntz, Matthias; Shafii, Mahyar; Zink, Matthias; Schäfer, David; Thober, Stephan; Samaniego, Luis; Tolson, Bryan

    2016-04-01

    Hydrologic models are traditionally calibrated against observed streamflow. Recent studies have shown however, that only a few global model parameters are constrained using this kind of integral signal. They can be identified using prior screening techniques. Since different objectives might constrain different parameters, it is advisable to use multiple information to calibrate those models. One common approach is to combine these multiple objectives (MO) into one single objective (SO) function and allow the use of a SO optimization algorithm. Another strategy is to consider the different objectives separately and apply a MO Pareto optimization algorithm. In this study, two major research questions will be addressed: 1) How do multi-objective calibrations compare with corresponding single-objective calibrations? 2) How much do calibration results deteriorate when the number of calibrated parameters is reduced by a prior screening technique? The hydrologic model employed in this study is a distributed hydrologic model (mHM) with 52 model parameters, i.e. transfer coefficients. The model uses grid cells as a primary hydrologic unit, and accounts for processes like snow accumulation and melting, soil moisture dynamics, infiltration, surface runoff, evapotranspiration, subsurface storage and discharge generation. The model is applied in three distinct catchments over Europe. The SO calibrations are performed using the Dynamically Dimensioned Search (DDS) algorithm with a fixed budget while the MO calibrations are achieved using the Pareto Dynamically Dimensioned Search (PA-DDS) algorithm allowing for the same budget. The two objectives used here are the Nash Sutcliffe Efficiency (NSE) of the simulated streamflow and the NSE of the logarithmic transformation. It is shown that the SO DDS results are located close to the edges of the Pareto fronts of the PA-DDS. The MO calibrations are hence preferable due to their supply of multiple equivalent solutions from which the

  16. Big Software for SmallSats: Adapting cFS to CubeSat Missions

    NASA Technical Reports Server (NTRS)

    Cudmore, Alan P.; Crum, Gary Alex; Sheikh, Salman; Marshall, James

    2015-01-01

    Expanding capabilities and mission objectives for SmallSats and CubeSats is driving the need for reliable, reusable, and robust flight software. While missions are becoming more complicated and the scientific goals more ambitious, the level of acceptable risk has decreased. Design challenges are further compounded by budget and schedule constraints that have not kept pace. NASA's Core Flight Software System (cFS) is an open source solution which enables teams to build flagship satellite level flight software within a CubeSat schedule and budget. NASA originally developed cFS to reduce mission and schedule risk for flagship satellite missions by increasing code reuse and reliability. The Lunar Reconnaissance Orbiter, which launched in 2009, was the first of a growing list of Class B rated missions to use cFS.

  17. Lean Mean Times--Budgeting for School Media Technology.

    ERIC Educational Resources Information Center

    Johnson, Doug

    1995-01-01

    Discusses budgeting strategies for school media technology programs. Highlights include sources for school funding, school district budget information, control of the budget, how to write an effective budget, working with other community and school groups, local politics, and sidebars that discuss spreadsheets and maintenance budgets. (LRW)

  18. Colorado Children's Budget 2010

    ERIC Educational Resources Information Center

    Colorado Children's Campaign, 2010

    2010-01-01

    The "Children's Budget 2010" is intended to be a resource guide for policymakers and advocates who are interested in better understanding how Colorado funds children's programs and services. It attempts to clarify often confusing budget information and describe where the state's investment trends are and where those trends will lead the…

  19. 40 CFR 97.140 - State trading budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false State trading budgets. 97.140 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Allowance Allocations § 97.140 State trading budgets. The State trading budgets for annual allocations of CAIR NOX allowances...

  20. 40 CFR 97.140 - State trading budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false State trading budgets. 97.140 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Allowance Allocations § 97.140 State trading budgets. The State trading budgets for annual allocations of CAIR NOX allowances...

  1. 40 CFR 97.140 - State trading budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false State trading budgets. 97.140 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Allowance Allocations § 97.140 State trading budgets. The State trading budgets for annual allocations of CAIR NOX allowances...

  2. 40 CFR 97.140 - State trading budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false State trading budgets. 97.140 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Allowance Allocations § 97.140 State trading budgets. The State trading budgets for annual allocations of CAIR NOX allowances...

  3. 40 CFR 97.140 - State trading budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 97.140 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Allowance Allocations § 97.140 State trading budgets. The State trading budgets for annual allocations of CAIR NOX allowances...

  4. Scheduling Nonconsumable Resources

    NASA Technical Reports Server (NTRS)

    Porta, Harry J.

    1990-01-01

    Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

  5. Earth Radiation Budget Science, 1978. [conferences

    NASA Technical Reports Server (NTRS)

    1978-01-01

    An earth radiation budget satellite system planned in order to understand climate on various temporal and spatial scales is considered. Topics discussed include: climate modeling, climate diagnostics, radiation modeling, radiation variability and correlation studies, cloudiness and the radiation budget, and radiation budget and related measurements in 1985 and beyond.

  6. 25 CFR 41.12 - Annual budget.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Annual budget. 41.12 Section 41.12 Indians BUREAU OF... NAVAJO COMMUNITY COLLEGE Tribally Controlled Community Colleges § 41.12 Annual budget. Appropriations... identified in the Bureau of Indian Affairs Budget Justification. Funds appropriated for grants under this...

  7. A Capsule Look at Zero-Base Budgeting.

    ERIC Educational Resources Information Center

    Griffin, William A., Jr.

    Weaknesses of the traditional incremental budgeting approach are considered as background to indicate the need for a new system of budgeting in educational institutions, and a step-by-step description of zero-based budgeting (ZBB) is presented. Proposed advantages of ZBB include the following: better staff morale due to a budget that is open and…

  8. 34 CFR 75.251 - The budget period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false The budget period. 75.251 Section 75.251 Education... Multi-Year Projects § 75.251 The budget period. (a) The Secretary usually approves a budget period of... budget period; and (2) Indicates his or her intention to make contination awards to fund the remainder of...

  9. 24 CFR 982.157 - Budget and expenditure.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Budget and expenditure. 982.157... and PHA Administration of Program § 982.157 Budget and expenditure. (a) Budget submission. Each PHA fiscal year, the PHA must submit its proposed budget for the program to HUD for approval at such time and...

  10. The Long-Term Budget Outlook

    DTIC Science & Technology

    2005-12-01

    Revenues Under CBO’s Long-Term Budget Scenarios 56A-8. Real Gross Domestic Product Under CBO’s Long-Term Budget Scenarios 57A-9. Total Surplus or...scenarios suggest that total federal spending for Medicare and Medicaid in 2050 could range anywhere from 7 percent of gross domestic product (GDP)—a...see the Congressional Budget Office’s glossary of budgetary and economic terms, available at www.cbo.gov. 2. The future path of productivity growth

  11. Implementing Site-based Budgeting.

    ERIC Educational Resources Information Center

    Sielke, Catherine C.

    2001-01-01

    Discusses five questions that must be answered before implementing site-based budgeting: Why are we doing this? What budgeting decisions will be devolved to the school site? How do dollars flow from the central office to the site? Who will be involved at the site? How will accountability be achieved? (Author/PKP)

  12. Colorado Children's Budget 2005

    ERIC Educational Resources Information Center

    Colorado Children's Campaign, 2005

    2005-01-01

    The Children's Budget is a comprehensive report on funding for children's services in Colorado. This report provides a six- year funding history for more than 50 programs funded with state, local, and federal dollars. The Colorado Children's Budget analyzes reductions in programs and services during the economic downturn. The data in the…

  13. A microeconomic scheduler for parallel computers

    NASA Technical Reports Server (NTRS)

    Stoica, Ion; Abdel-Wahab, Hussein; Pothen, Alex

    1995-01-01

    We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

  14. Federal Budget Considerations for Colleges, 1998.

    ERIC Educational Resources Information Center

    Association of Colleges of Applied Arts and Technology of Ontario, North York.

    This document highlights federal budget considerations for colleges of applied arts and technology in Ontario, Canada. A key focus of the budget is the Federal Government's Canadian Opportunities Strategy, which supports the acquisition of skills and knowledge required for the 21st century. The budget's emphasis on education over other social…

  15. 40 CFR 35.9035 - Budget period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Budget period. 35.9035 Section 35.9035... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9035 Budget period. An applicant may choose its budget period in consultation with and subject to the approval of the Regional Administrator. ...

  16. 42 CFR 441.472 - Budget methodology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Budget methodology. 441.472 Section 441.472 Public... Self-Directed Personal Assistance Services Program § 441.472 Budget methodology. (a) The State shall set forth a budget methodology that ensures service authorization resides with the State and meets the...

  17. Budget-makers and health care systems.

    PubMed

    White, Joseph

    2013-10-01

    Health programs are shaped by the decisions made in budget processes, so how budget-makers view health programs is an important part of making health policy. Budgeting in any country involves its own policy community, with key players including budgeting professionals and political authorities. This article reviews the typical pressures on and attitudes of these actors when they address health policy choices. The worldview of budget professionals includes attitudes that are congenial to particular policy perspectives, such as the desire to select packages of programs that maximize population health. The pressures on political authorities, however, are very different: most importantly, public demand for health care services is stronger than for virtually any other government activity. The norms and procedures of budgeting also tend to discourage adoption of some of the more enthusiastically promoted health policy reforms. Therefore talk about rationalizing systems is not matched by action; and action is better explained by the need to minimize blame. The budget-maker's perspective provides insight about key controversies in healthcare policy such as decentralization, competition, health service systems as opposed to health insurance systems, and dedicated vs. general revenue finance. It also explains the frequency of various "gaming" behaviors. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  18. Community College Budgeting and Financing Demystified

    ERIC Educational Resources Information Center

    Murphy, David S.; Katsinas, Stephen G.

    2014-01-01

    The topic of budgeting and financial resources often strikes fear in the hearts of community college administrators and faculty, as they believe it is an arcane and complex art understood only by accountants and financial specialists. This chapter attempts to demystify the basic concepts involved in budgeting and addresses approaches to budgeting,…

  19. 12 CFR 917.8 - Budget preparation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Budget preparation. 917.8 Section 917.8 Banks... POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.8 Budget preparation. (a) Adoption of budgets. Each Bank's board of directors shall be responsible for the adoption of an...

  20. Predictive Modeling: Linking Enrollment and Budgeting

    ERIC Educational Resources Information Center

    Trusheim, Dale; Rylee, Carol

    2011-01-01

    The hard choices that must be made to balance budgets at higher education institutions can be painful and have dramatic consequences that may linger for years. If enrollment projections and therefore tuition income/budgeting projections for future years are inaccurate, then the result may be unnecessary or insufficient budget reductions, both of…

  1. Budgeting Based on Results

    ERIC Educational Resources Information Center

    Cooper, Kelt L.

    2011-01-01

    Every program in a school or school district has, or once had, a purpose. The purpose was most likely promoted, argued and debated among school constituencies--parents, teachers, administrators and school board members--before it was eventually approved. This process occurs year after year, budget after budget. In itself, this is not necessarily a…

  2. NOAA seeks healthy budget

    NASA Astrophysics Data System (ADS)

    Bush, Susan

    The small, crowded room of the House side of the U.S. Capitol building belied the large budget of $1,611,991,000 requested for Fiscal Year 1992 by the National Oceanic and Atmospheric Administration. John A. Knauss, Undersecretary for Oceans and Atmosphere, U.S. Department of Commerce, delivered his testimony on February 28 before the House Appropriations Subcommittee on Commerce, Justice, and State, the Judiciary and Related Agencies. He told the subcommittee that the budget “attempts to balance the two goals of maintaining NOAA's position as an important science agency and addressing the serious budget problems that the government continues to face.”Climate and global change, modernization of the National Weather Service, and the Coastal Ocean Science program are NOAA's three ongoing, high-priority initiatives that the budget addresses. Also, three additional initiatives—a NOAA-wide program to improve environmental data management, President Bush's multiagency Coastal America initiative, and a seafood safety program administered jointly by NOAA and the Food and Drug Administration—are addressed.

  3. Sensor-scheduling simulation of disparate sensors for Space Situational Awareness

    NASA Astrophysics Data System (ADS)

    Hobson, T.; Clarkson, I.

    2011-09-01

    The art and science of space situational awareness (SSA) has been practised and developed from the time of Sputnik. However, recent developments, such as the accelerating pace of satellite launch, the proliferation of launch capable agencies, both commercial and sovereign, and recent well-publicised collisions involving man-made space objects, has further magnified the importance of timely and accurate SSA. The United States Strategic Command (USSTRATCOM) operates the Space Surveillance Network (SSN), a global network of sensors tasked with maintaining SSA. The rapidly increasing number of resident space objects will require commensurate improvements in the SSN. Sensors are scarce resources that must be scheduled judiciously to obtain measurements of maximum utility. Improvements in sensor scheduling and fusion, can serve to reduce the number of additional sensors that may be required. Recently, Hill et al. [1] have proposed and developed a simulation environment named TASMAN (Tasking Autonomous Sensors in a Multiple Application Network) to enable testing of alternative scheduling strategies within a simulated multi-sensor, multi-target environment. TASMAN simulates a high-fidelity, hardware-in-the-loop system by running multiple machines with different roles in parallel. At present, TASMAN is limited to simulations involving electro-optic sensors. Its high fidelity is at once a feature and a limitation, since supercomputing is required to run simulations of appreciable scale. In this paper, we describe an alternative, modular and scalable SSA simulation system that can extend the work of Hill et al with reduced complexity, albeit also with reduced fidelity. The tool has been developed in MATLAB and therefore can be run on a very wide range of computing platforms. It can also make use of MATLAB’s parallel processing capabilities to obtain considerable speed-up. The speed and flexibility so obtained can be used to quickly test scheduling algorithms even with a

  4. A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet

    1996-01-01

    Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

  5. 7 CFR 1744.63 - The telephone loan budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false The telephone loan budget. 1744.63 Section 1744.63... Disbursement of Funds § 1744.63 The telephone loan budget. When the loan is made, RUS provides the borrower a Telephone Loan Budget, RUS Form 493. This budget divides the loan into budget accounts such as “Engineering...

  6. Planning to Communicate: A Budget Companion

    ERIC Educational Resources Information Center

    Dereef, Marvin

    2011-01-01

    Failing to have a plan to communicate with stakeholders during the budget process is a plan to fail. Without community support, getting budget approval can be difficult. Thus, school business officials must have a plan to ensure the appropriate budget message is conveyed throughout all communication channels. In fact, a communication plan is the…

  7. Optimal timber harvest scheduling with spatially defined sediment objectives

    Treesearch

    Jon Hof; Michael Bevers

    2000-01-01

    This note presents a simple model formulation that focuses on the spatial relationships over time between timber harvesting and sediment levels in water runoff courses throughout the watershed being managed. A hypothetical example is developed to demonstrate the formulation and show how sediment objectives can be spatially defined anywhere in the watershed. Spatial...

  8. Operational VGOS Scheduling

    NASA Astrophysics Data System (ADS)

    Searle, Anthony; Petrachenko, Bill

    2016-12-01

    The VLBI Global Observing System (VGOS) has been designed to take advantage of advances in data recording speeds and storage capacity, allowing for smaller and faster antennas, wider bandwidths, and shorter observation durations. Here, schedules for a ``realistic" VGOS network, frequency sequences, and expanded source lists are presented using a new source-based scheduling algorithm. The VGOS aim for continuous observations presents new operational challenges. As the source-based strategy is independent of the observing network, there are operational advantages which allow for more flexible scheduling of continuous VLBI observations. Using VieVS, simulations of several schedules are presented and compared with previous VGOS studies.

  9. Flextime: A Modified Work Force Scheduling Technique for Selected Headquarters Air Force Logistics Command Organizations.

    ERIC Educational Resources Information Center

    Kimzey, Reed T.; Prince, Samuel M. O.

    The thesis discusses the advantages and disadvantages of one work force scheduling technique--flextime. The authors were interested in determining if a flextime schedule could be put into effect in a governmental organization such as Headquarters Air Force Logistics Command (AFLC). The study objectives were to determine the feasibility,…

  10. An Improved Memetic Algorithm for Break Scheduling

    NASA Astrophysics Data System (ADS)

    Widl, Magdalena; Musliu, Nysret

    In this paper we consider solving a complex real life break scheduling problem. This problem of high practical relevance arises in many working areas, e.g. in air traffic control and other fields where supervision personnel is working. The objective is to assign breaks to employees such that various constraints reflecting legal demands or ergonomic criteria are satisfied and staffing requirement violations are minimised.

  11. Training and Operations Integrated Calendar Scheduler - TROPICS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.E. Oppenlander; A.J. Levy; V.A. Arbige

    2003-01-27

    TROPICS is a rule-based scheduling system that optimizes the training experience for students in a power (note this change should be everywhere, i.e. Not reactor) plant environment. The problem is complicated by the condition that plant resources and users' time must be simultaneously scheduled to make best use of both. The training facility is highly constrained in how it is used, and, as in many similar environments, subject to dynamic change with little or no advance notice. The flexibility required extends to changes resulting from students' actions such as absences. Even though the problem is highly constrained by plant usagemore » and student objectives, the large number of possible schedules is a concern. TROPICS employs a control strategy for rule firing to prune the possibility tree and avoid combinatorial explosion. The application has been in use since 1996, first as a prototype for testing and then in production. Training Coordinators have a philosophical aspect to teaching students that has made the rule-based approach much more verifiable and satisfying to the domain experts than other forms of capturing expertise.« less

  12. Incentive Compatible Online Scheduling of Malleable Parallel Jobs with Individual Deadlines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carroll, Thomas E.; Grosu, Daniel

    2010-09-13

    We consider the online scheduling of malleable jobs on parallel systems, such as clusters, symmetric multiprocessing computers, and multi-core processor computers. Malleable jobs is a model of parallel processing in which jobs adapt to the number of processors assigned to them. This model permits the scheduler and resource manager to make more efficient use of the available resources. Each malleable job is characterized by arrival time, deadline, and value. If the job completes by its deadline, the user earns the payoff indicated by the value; otherwise, she earns a payoff of zero. The scheduling objective is to maximize the summore » of the values of the jobs that complete by their associated deadlines. Complicating the matter is that users in the real world are rational and they will attempt to manipulate the scheduler by misreporting their jobs’ parameters if it benefits them to do so. To mitigate this behavior, we design an incentive compatible online scheduling mechanism. Incentive compatibility assures us that the users will obtain the maximum payoff only if they truthfully report their jobs’ parameters to the scheduler. Finally, we simulate and study the mechanism to show the effects of misreports on the cheaters and on the system.« less

  13. Most science spared big budget bite

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.

    Most science budgets emerged unscathed from President Ronald Reagan's fiscal 1983 budget proposal. Total funding for research and development came out slightly ahead of inflation, as did funding for basic research (Eos, February 16, p. 162). The National Science Foundation (NSF) edged past the projected 7.3% inflation rate for 1982, and the National Aeronautics and Space Administration (NASA) budget is to be increased by 10.6%. However, the U.S. Geological Survey (USGS) is budgeted for a 4.2% increase in funding, and the National Oceanic and Atmospheric Administration (NOAA) will take an 8.3% cut.

  14. Defense.gov Special Report: 2013 Fiscal Budget

    Science.gov Websites

    the fiscal 2013 budget would balance the armed forces' needs with the nation's economic situation, the Remain Superior Force Hale: Budget Request Shows Balance Navy Official Outlines New Budget Priorities

  15. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    PubMed

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  16. Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

    NASA Technical Reports Server (NTRS)

    Happell, Nadine; Moe, Karen L.; Minnix, Jay

    1993-01-01

    NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

  17. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  18. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  19. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  20. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  1. Realization of high quality production schedules: Structuring quality factors via iteration of user specification processes

    NASA Technical Reports Server (NTRS)

    Hamazaki, Takashi

    1992-01-01

    This paper describes an architecture for realizing high quality production schedules. Although quality is one of the most important aspects of production scheduling, it is difficult, even for a user, to specify precisely. However, it is also true that the decision as to whether a scheduler is good or bad can only be made by the user. This paper proposes the following: (1) the quality of a schedule can be represented in the form of quality factors, i.e. constraints and objectives of the domain, and their structure; (2) quality factors and their structure can be used for decision making at local decision points during the scheduling process; and (3) that they can be defined via iteration of user specification processes.

  2. 7 CFR 1212.50 - Budget and expenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... comparative data or at least one preceding year (except for the initial budget); (3) A summary of proposed... comparative data for at least one preceding year (except for the initial budget). (b) Each budget shall...

  3. 7 CFR 1212.50 - Budget and expenses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... comparative data or at least one preceding year (except for the initial budget); (3) A summary of proposed... comparative data for at least one preceding year (except for the initial budget). (b) Each budget shall...

  4. 7 CFR 1212.50 - Budget and expenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... comparative data or at least one preceding year (except for the initial budget); (3) A summary of proposed... comparative data for at least one preceding year (except for the initial budget). (b) Each budget shall...

  5. 7 CFR 1212.50 - Budget and expenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... comparative data or at least one preceding year (except for the initial budget); (3) A summary of proposed... comparative data for at least one preceding year (except for the initial budget). (b) Each budget shall...

  6. 7 CFR 1212.50 - Budget and expenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... comparative data or at least one preceding year (except for the initial budget); (3) A summary of proposed... comparative data for at least one preceding year (except for the initial budget). (b) Each budget shall...

  7. Filling the Holes: Work Schedulers as Job Crafters of Employment Practice in Long-Term Health Care

    PubMed Central

    Kossek, Ellen Ernst; Piszczek, Matthew M.; Mcalpine, Kristie L.; Hammer, Leslie B.; Burke, Lisa

    2016-01-01

    Although work schedulers serve an organizational role influencing decisions about balancing conflicting stakeholder interests over schedules and staffing, scheduling has primarily been described as an objective activity or individual job characteristic. The authors use the lens of job crafting to examine how schedulers in 26 health care facilities enact their roles as they “fill holes” to schedule workers. Qualitative analysis of interview data suggests that schedulers expand their formal scope and influence to meet their interpretations of how to manage stakeholders (employers, workers, and patients). The authors analyze variations in the extent of job crafting (cognitive, physical, relational) to broaden role repertoires. They find evidence that some schedulers engage in rule-bound interpretation to avoid role expansion. They also identify four types of schedulers: enforcers, patient-focused schedulers, employee-focused schedulers, and balancers. The article adds to the job-crafting literature by showing that job crafting is conducted not only to create meaningful work but also to manage conflicting demands and to mediate among the competing labor interests of workers, clients, and employers. PMID:27721517

  8. Uncertainty management by relaxation of conflicting constraints in production process scheduling

    NASA Technical Reports Server (NTRS)

    Dorn, Juergen; Slany, Wolfgang; Stary, Christian

    1992-01-01

    Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

  9. Perceptions of randomized security schedules.

    PubMed

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  10. Federal budget process: An overview

    NASA Astrophysics Data System (ADS)

    Frizzell, Virgil A., Jr.

    Much geophysical research funding originates from the federal government, and many who obtain federal funding consider the executive branch to be its source. In fact, the federal budget results from a complex ballet between the executive and legislative branches. Because it is both little understood and essential to our work, this report will review the fundamentals of the three-year budgetary process.The Constitution assigns the power of the purse to the Congress. Before the 1920s, executive branch agencies and departments submitted their own separate budgets to Congress, and deliberate planning and priority setting was minimal. In 1921 Congress empowered the president to submit an executive branch budget reflecting his priorities for the next fiscal year. Following this protocol, former President Reagan submitted his budget for Fiscal Year 1990 in January, and President Bush outlined his FY'90 priorities in February.

  11. Defense Base Realignment and Closure Budget Data for MCGuire Air Force Base, New Jersey

    DTIC Science & Technology

    1995-08-04

    The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of two projects, valued at $22.4 miilion, for the realignment of McGuire Air Force Base, New Jersey. The audit also assessed the adequacy of the management control program as it applied to the overall audit objective.

  12. Participative Budgeting, Budget Evaluation, and Organizational Trust in Post-Secondary Educational Institutions in Canada

    ERIC Educational Resources Information Center

    Simmons, Cynthia V.

    2012-01-01

    The purpose of this research was to investigate the relationship between a participative budgeting system, the attitudes toward the budget, and levels of organizational trust held by administrators in post-secondary institutions. A 50-item questionnaire was distributed to college and university administrators across Canada. A series of regression…

  13. Integrated Budget Office Toolbox

    NASA Technical Reports Server (NTRS)

    Rushing, Douglas A.; Blakeley, Chris; Chapman, Gerry; Robertson, Bill; Horton, Allison; Besser, Thomas; McCarthy, Debbie

    2010-01-01

    The Integrated Budget Office Toolbox (IBOT) combines budgeting, resource allocation, organizational funding, and reporting features in an automated, integrated tool that provides data from a single source for Johnson Space Center (JSC) personnel. Using a common interface, concurrent users can utilize the data without compromising its integrity. IBOT tracks planning changes and updates throughout the year using both phasing and POP-related (program-operating-plan-related) budget information for the current year, and up to six years out. Separating lump-sum funds received from HQ (Headquarters) into separate labor, travel, procurement, Center G&A (general & administrative), and servicepool categories, IBOT creates a script that significantly reduces manual input time. IBOT also manages the movement of travel and procurement funds down to the organizational level and, using its integrated funds management feature, helps better track funding at lower levels. Third-party software is used to create integrated reports in IBOT that can be generated for plans, actuals, funds received, and other combinations of data that are currently maintained in the centralized format. Based on Microsoft SQL, IBOT incorporates generic budget processes, is transportable, and is economical to deploy and support.

  14. Impaired Behavior Regulation under Conditions of Concurrent Variable Schedules of Reinforcement in Children with ADHD

    ERIC Educational Resources Information Center

    Taylor, David; Lincoln, Alan J.; Foster, Sharon L.

    2010-01-01

    Objective: To bridge theory of response inhibition and learning in children with ADHD. Method: Thirty ADHD and 30 non-ADHD children (ages 9-12) were compared under concurrent variable interval (VI-15 sec., VI-30 sec. and VI- 45 sec.) reinforcement schedules that required the child to switch between the three schedules under conditions of…

  15. 40 CFR 52.2424 - Motor vehicle emissions budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emissions budgets. (a) Motor vehicle emissions budget for the Hampton Roads maintenance area adjusting the mobile emissions budget contained in the maintenance plan for the horizon years 2015 and beyond adopted..., 1996. (b) Motor vehicle emissions budget for the Richmond maintenance area adjusting the mobile...

  16. Spending Smart: How To Budget and Finance. Making Sense of Your Budget Dollars; Success with Budget Proposals; Encumbering Grants: Managing the Money; Write a Grant? Me?; Using Microsoft[R] Excel To Plan and Budget in Your School Library; Charging Ahead; The No-Money Lottery; Coffee, Anyone?

    ERIC Educational Resources Information Center

    Bernstein, Allison; Baule, Steve; Farmer, Lesley S. J.; Anderson, Cyndee; Barringer, Crystal; Buchanan, Peggy; Fullner, Sheryl Kindle; Knop, Kathi; Larson, Chris

    2002-01-01

    Includes eight articles that address issues related to budgeting and finances in secondary school libraries. Topics include limited budgets; budget proposals; administering grants; writing grants; using Microsoft's Excel software for budgeting; using credit cards for library purchases; offering prizes for donating books; and offering coffee and…

  17. Composite Scheduling

    ERIC Educational Resources Information Center

    Childers, Gary L.; Ireland, Rebecca Weeks

    2005-01-01

    In education, there is no one best way to do anything. There are compelling reasons why some courses should be taught in longer segments of time, which the block schedule provides. There are also compelling reasons why some classes should be taught in shorter segments. At Watauga High School in Boone, North Carolina, an alternative schedule that…

  18. Emergency material allocation and scheduling for the application to chemical contingency spills under multiple scenarios.

    PubMed

    Liu, Jie; Guo, Liang; Jiang, Jiping; Jiang, Dexun; Wang, Peng

    2017-01-01

    In the emergency management relevant to chemical contingency spills, efficiency emergency rescue can be deeply influenced by a reasonable assignment of the available emergency materials to the related risk sources. In this study, an emergency material scheduling model (EMSM) with time-effective and cost-effective objectives is developed to coordinate both allocation and scheduling of the emergency materials. Meanwhile, an improved genetic algorithm (IGA) which includes a revision operation for EMSM is proposed to identify the emergency material scheduling schemes. Then, scenario analysis is used to evaluate optimal emergency rescue scheme under different emergency pollution conditions associated with different threat degrees based on analytic hierarchy process (AHP) method. The whole framework is then applied to a computational experiment based on south-to-north water transfer project in China. The results demonstrate that the developed method not only could guarantee the implementation of the emergency rescue to satisfy the requirements of chemical contingency spills but also help decision makers identify appropriate emergency material scheduling schemes in a balance between time-effective and cost-effective objectives.

  19. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  20. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  1. NCTN Budget

    Cancer.gov

    Learn about the budget for the National Clinical Trials Network (NCTN), a National Cancer Institute program that gives funds and other support to cancer research organizations to conduct cancer clinical trials.

  2. Reading College Budgets: A Guide to Recent Changes.

    ERIC Educational Resources Information Center

    Dubeck, Leroy W.

    1995-01-01

    Changes in the National Education Association's new edition of "Budget Handbook for College Faculty and Staff," reflecting new rules for institutional accounting, are summarized and implications for faculty and staff are highlighted. Budget terminology, sources of budget information, and budget components are detailed as well as changes…

  3. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  4. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  5. A user interface for a knowledge-based planning and scheduling system

    NASA Technical Reports Server (NTRS)

    Mulvehill, Alice M.

    1988-01-01

    The objective of EMPRESS (Expert Mission Planning and Replanning Scheduling System) is to support the planning and scheduling required to prepare science and application payloads for flight aboard the US Space Shuttle. EMPRESS was designed and implemented in Zetalisp on a 3600 series Symbolics Lisp machine. Initially, EMPRESS was built as a concept demonstration system. The system has since been modified and expanded to ensure that the data have integrity. Issues underlying the design and development of the EMPRESS-I interface, results from a system usability assessment, and consequent modifications are described.

  6. Short-term hydro generation and interchange contract scheduling for Swiss Rail

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christoforidis, M.; Awobamise, B.; Tong, S.

    This paper describes the Short-Term Resource Scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) Energy Management System. Optimal scheduling of the single-phase hydro plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and regulating reserve requirements), is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment.

  7. What Is Your Budget Saying about Your Library?

    ERIC Educational Resources Information Center

    Jacobs, Leslie; Strouse, Roger

    2002-01-01

    Discusses budgeting for corporate libraries and how to keep budgets from getting cut. Topics include whether the budget is considered corporate overhead; recovering costs; models for content cost recovery; showing return on library investment; marketing library value to senior management; user needs and satisfaction; and comparing budgets to other…

  8. 14 CFR 152.323 - Budget revision: Airport development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Budget revision: Airport development. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.323 Budget... change in the budget estimates, the sponsor shall submit a request for budget revision on a form...

  9. 24 CFR 791.405 - Reallocations of budget authority.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Reallocations of budget authority... Allocation of Budget Authority for Housing Assistance § 791.405 Reallocations of budget authority. (a) The field office shall make every reasonable effort to use the budget authority made available for each...

  10. Proposed NOAA Budget Includes Hefty Increase for Satellites

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-03-01

    The Obama administration's proposed fiscal year (FY) 2011 budget for the U.S. National Oceanic and Atmospheric Administration (NOAA) would provide the agency with $5.55 billion, which represents a total increase of $806.1 million, or 17% above the FY 2010 budget enacted by Congress. At a February briefing about the budget, NOAA administrator Jane Lubchenco said the budget is a very good package for the agency and that it reflects the administration's commitment to the environment, science, public safety, and job creation. Noting that the agency's budget remained essentially flat between FY 2005 and FY 2008 during the George W. Bush administration, Lubchenco said, “the increasing demand for NOAA's services, coupled with a static budget, created a major challenge for NOAA in delivering on expectations.” She said the funding picture for the agency improved with the FY 2009 and FY 2010 enacted budgets. Lubchenco noted that the proposed budget would include $949 million for research and development, an $82 million increase, adding, “Our 2011 request for each line office [within NOAA] is higher than it was in 2010, and we are better aligned with congressional funding levels than in previous budgets.”

  11. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  12. Flexibility for Vocational Education through Computer Scheduling. Quarterly Report.

    ERIC Educational Resources Information Center

    Allen, Dwight W.

    This progress report of a 2-year project (ending April 30, 1968) offers a random sampling of course schedule configurations and specific course performance criteria submitted to the Stanford project staff for evaluation and comment, and a brief statement of the project's data collection and data evaluation objectives. The project seeks to…

  13. 40 CFR 96.40 - State trading program budget.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false State trading program budget. 96.40... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Allocations § 96.40 State trading program budget. The State trading program budget...

  14. 40 CFR 96.40 - State trading program budget.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false State trading program budget. 96.40... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO 2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Allocations § 96.40 State trading program budget. The State trading program budget...

  15. 40 CFR 96.40 - State trading program budget.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false State trading program budget. 96.40... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Allocations § 96.40 State trading program budget. The State trading program budget...

  16. 40 CFR 96.40 - State trading program budget.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false State trading program budget. 96.40... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Allocations § 96.40 State trading program budget. The State trading program budget...

  17. 40 CFR 96.40 - State trading program budget.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading program budget. 96.40... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Allocations § 96.40 State trading program budget. The State trading program budget...

  18. 40 CFR 52.244 - Motor vehicle emissions budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Motor vehicle emissions budgets. 52.244... budgets. (a) Approval of the motor vehicle emissions budgets for the following ozone rate-of-progress and attainment SIPs will apply for transportation conformity purposes only until new budgets based on updated...

  19. Budgeting in Tertiary Educational Institutions: An Analysis.

    ERIC Educational Resources Information Center

    Shand, D. A.

    1982-01-01

    Administrators should examine the role and limitations of their budgeting systems and consider overemphasis on control of spending rather than efficiency or effectiveness, limitations on cash-based budgeting, need for information on operating costs, and the short range and fragmented nature of most budgets. (MSE)

  20. 5 CFR 1320.17 - Information collection budget.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Information collection budget. 1320.17 Section 1320.17 Administrative Personnel OFFICE OF MANAGEMENT AND BUDGET OMB DIRECTIVES CONTROLLING PAPERWORK BURDENS ON THE PUBLIC § 1320.17 Information collection budget. Each agency's Senior Official, or...

  1. Scheduling language and algorithm development study. Volume 1: Study summary and overview

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

  2. 40 CFR 96.23 - NOX Budget permit contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget permit contents. 96.23... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Permits § 96.23 NOX Budget permit contents. (a) Each NOX Budget permit (including any draft or proposed...

  3. 7 CFR 1208.50 - Budget and expenses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., RESEARCH, AND INFORMATION ORDER Processed Raspberry Promotion, Research, and Information Order Expenses and... budget for research, promotion, or information may not be implemented prior to approval of the budget by... anticipated revenue, with comparative data of at least one preceding year (except for the initial budget); and...

  4. 7 CFR 1208.50 - Budget and expenses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., RESEARCH, AND INFORMATION ORDER Processed Raspberry Promotion, Research, and Information Order Expenses and... budget for research, promotion, or information may not be implemented prior to approval of the budget by... anticipated revenue, with comparative data of at least one preceding year (except for the initial budget); and...

  5. Application of a hybrid generation/utility assessment heuristic to a class of scheduling problems

    NASA Technical Reports Server (NTRS)

    Heyward, Ann O.

    1989-01-01

    A two-stage heuristic solution approach for a class of multiobjective, n-job, 1-machine scheduling problems is described. Minimization of job-to-job interference for n jobs is sought. The first stage generates alternative schedule sequences by interchanging pairs of schedule elements. The set of alternative sequences can represent nodes of a decision tree; each node is reached via decision to interchange job elements. The second stage selects the parent node for the next generation of alternative sequences through automated paired comparison of objective performance for all current nodes. An application of the heuristic approach to communications satellite systems planning is presented.

  6. Production Scheduling for Rehabilitation Workshops.

    ERIC Educational Resources Information Center

    Hietala, David A.

    This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…

  7. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  8. Budget Update, November 9, 2010. Report 10-20

    ERIC Educational Resources Information Center

    Woolfork, Kevin

    2010-01-01

    On October 8, Governor Arnold Schwarzenegger signed the 2010-11 Budget Act for the State of California. This budget was the outcome of many months of negotiation between the Governor and the Legislature. The Governor vetoed $963 million in spending from the Legislature's budget, arriving at a budget that addresses an estimated $19.1 billion…

  9. 40 CFR 97.23 - NOX Budget permit contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget permit contents. 97.23... (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.23 NOX Budget permit contents. (a) Each NOX Budget permit will contain, in a format prescribed by the permitting...

  10. 40 CFR 96.25 - NOX Budget permit revisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget permit revisions. 96.25... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Permits § 96.25 NOX Budget permit revisions. (a) For a NOX Budget source with a title V operating permit...

  11. 40 CFR 97.24 - NOX Budget permit revisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget permit revisions. 97.24... (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.24 NOX Budget permit revisions. (a) For a NOX Budget source with a title V operating permit, except as provided...

  12. Mixed-Initiative Planning and Scheduling for Science Missions

    NASA Technical Reports Server (NTRS)

    Myers, Karen L.; Wolverton, Michael J.

    2004-01-01

    The objective of this joint NASA Ames/JPL/SRI project was to develop mixed-initiative planning and scheduling technology that would enable more effective and efficient planning of science missions. The original intent behind the project was to have all three organizations work closely on the overall research and technology development objectives. Shortly after the project began, however, the Ames and JPL project members made a commitment to develop and field an operational mixed-initiative planning and scheduling tool called MAPGEN for the 2003 Mars Exploration Rover (MER) mission [Ai-Chang et al. 2003]. Because of the tremendous amounts of time and effort that went into making that tool a success, the Ames and JPL personnel were mostly unavailable for collaboration on the joint objectives of the original proposal. Until November of 2002, SRI postponed work on the project in the hope that the Ames and JPL personnel would be able to find time for the planned collaborative research. During discussions between Dr. Karen Myers (the SRI institutional PI) and Dr. John Bresina (the project PI) during November of 2002, it was mutually agreed that SRI should work independently to achieve some of the research objectives for the project. In particular, Dr. Bresina identified explanation of plans and planner behavior as a critical area for research, based on feedback from demonstrating an initial prototype of MAPGEN to the operational community. For that reason, our focus from November of 2002 through the end of the project was on designing explanation methods to address this need.

  13. Budget of the U.S. Government, Fiscal Year 2013

    ERIC Educational Resources Information Center

    Office of Management and Budget, Executive Office of the President, 2012

    2012-01-01

    "Budget of the United States Government, Fiscal Year 2013" contains the Budget Message of the President, information on the President's priorities, budget overviews organized by agency, and summary tables. The 2013 Budget contains a number of steps to put the country on a fiscally sustainable path. First, this Budget implements the tight…

  14. 7 CFR 1210.340 - Budget and expenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budget and expenses. 1210.340 Section 1210.340... PROMOTION PLAN Watermelon Research and Promotion Plan Expenses and Assessments § 1210.340 Budget and... shall prepare and recommend a budget on a fiscal period basis of its anticipated expenses and...

  15. 40 CFR 97.23 - NOX Budget permit contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false NOX Budget permit contents. 97.23 Section 97.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.23 NOX Budget permit contents. (a) Each NOX Budget permit...

  16. Multi-trip vehicle routing and scheduling problem with time window in real life

    NASA Astrophysics Data System (ADS)

    Sze, San-Nah; Chiew, Kang-Leng; Sze, Jeeu-Fong

    2012-09-01

    This paper studies a manpower scheduling problem with multiple maintenance operations and vehicle routing considerations. Service teams located at a common service centre are required to travel to different customer sites. All customers must be served within given time window, which are known in advance. The scheduling process must take into consideration complex constraints such as a meal break during the team's shift, multiple travelling trips, synchronisation of service teams and working shifts. The main objective of this study is to develop a heuristic that can generate high quality solution in short time for large problem instances. A Two-stage Scheduling Heuristic is developed for different variants of the problem. Empirical results show that the proposed solution performs effectively and efficiently. In addition, our proposed approximation algorithm is very flexible and can be easily adapted to different scheduling environments and operational requirements.

  17. Coordinated scheduling for dynamic real-time systems

    NASA Technical Reports Server (NTRS)

    Natarajan, Swaminathan; Zhao, Wei

    1994-01-01

    In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

  18. 40 CFR 96.340 - State trading budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false State trading budgets. 96.340 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.340 State trading budgets. (a) Except as provided in...

  19. 40 CFR 96.340 - State trading budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false State trading budgets. 96.340 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO 2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.340 State trading budgets. (a) Except as provided in...

  20. 40 CFR 96.340 - State trading budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false State trading budgets. 96.340 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.340 State trading budgets. (a) Except as provided in...

  1. 40 CFR 96.340 - State trading budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false State trading budgets. 96.340 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.340 State trading budgets. (a) Except as provided in...

  2. 40 CFR 96.340 - State trading budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 96.340 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.340 State trading budgets. (a) Except as provided in...

  3. 7 CFR 1207.341 - Budget and expenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budget and expenses. 1207.341 Section 1207.341... PLAN Potato Research and Promotion Plan Expenses and Assessments § 1207.341 Budget and expenses. (a) At... recommend a budget on a fiscal period basis of its anticipated expenses and disbursements in the...

  4. 33 CFR 273.17 - Annual budget request.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Annual budget request. 273.17... DEFENSE AQUATIC PLANT CONTROL § 273.17 Annual budget request. The Aquatic Plant Control Program is a... to utilize within the budget year taking into account the foreseeable availability of local funds to...

  5. The global carbon dioxide budget

    USGS Publications Warehouse

    Sundquist, E.T.

    1993-01-01

    The increase in atmospheric CO2 levels during the last deglaciation was comparable in magnitude to the recent historical increase. However, global CO2 budgets for these changes reflect fundamental differences in rates and in sources and sinks. The modern oceans are a rapid net CO2 sink, whereas the oceans were a gradual source during the deglaciation. Unidentified terrestrial CO2 sinks are important uncertainties in both the deglacial and recent CO2 budgets. The deglacial CO2 budget represents a complexity of long-term dynamic behavior that is not adequately addressed by current models used to forecast future atmospheric CO2 levels.

  6. Energy-efficient approach to minimizing the energy consumption in an extended job-shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Tang, Dunbing; Dai, Min

    2015-09-01

    The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors like energy consumption of production have not been completely taken into consideration. Against this background, this paper addresses an approach to modify a given schedule generated by a production planning and scheduling system in a job shop floor, where machine tools can work at different cutting speeds. It can adjust the cutting speeds of the operations while keeping the original assignment and processing sequence of operations of each job fixed in order to obtain energy savings. First, the proposed approach, based on a mixed integer programming mathematical model, changes the total idle time of the given schedule to minimize energy consumption in the job shop floor while accepting the optimal solution of the scheduling objective, makespan. Then, a genetic-simulated annealing algorithm is used to explore the optimal solution due to the fact that the problem is strongly NP-hard. Finally, the effectiveness of the approach is performed smalland large-size instances, respectively. The experimental results show that the approach can save 5%-10% of the average energy consumption while accepting the optimal solution of the makespan in small-size instances. In addition, the average maximum energy saving ratio can reach to 13%. And it can save approximately 1%-4% of the average energy consumption and approximately 2.4% of the average maximum energy while accepting the near-optimal solution of the makespan in large-size instances. The proposed research provides an interesting point to explore an energy-aware schedule optimization for a traditional production planning and scheduling problem.

  7. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2004-01-01

    Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

  8. Surgical demand scheduling: a review.

    PubMed Central

    Magerlein, J M; Martin, J B

    1978-01-01

    This article reviews the literature on scheduling of patient demand for surgery and outlines an approach to improving overall performance of hospital surgical suites. Reported scheduling systems are categorized into those that schedule patients in advance of the surgical date and those that schedule available patients on the day of surgery. Approaches to estimating surgical procedure times are also reviewed, and the article concludes with a discussion of the failure to implement the majority of reported scheduling schemes. PMID:367987

  9. Generating spatially optimized habitat in a trade-off between social optimality and budget efficiency.

    PubMed

    Drechsler, Martin

    2017-02-01

    Auctions have been proposed as alternatives to payments for environmental services when spatial interactions and costs are better known to landowners than to the conservation agency (asymmetric information). Recently, an auction scheme was proposed that delivers optimal conservation in the sense that social welfare is maximized. I examined the social welfare and the budget efficiency delivered by this scheme, where social welfare represents the difference between the monetized ecological benefit and the conservation cost incurred to the landowners and budget efficiency is defined as maximizing the ecological benefit for a given conservation budget. For the analysis, I considered a stylized landscape with land patches that can be used for agriculture or conservation. The ecological benefit was measured by an objective function that increases with increasing number and spatial aggregation of conserved land patches. I compared the social welfare and the budget efficiency of the auction scheme with an agglomeration payment, a policy scheme that considers spatial interactions and that was proposed recently. The auction delivered a higher level of social welfare than the agglomeration payment. However, the agglomeration payment was more efficient budgetarily than the auction, so the comparative performances of the 2 schemes depended on the chosen policy criterion-social welfare or budget efficiency. Both policy criteria are relevant for conservation. Which one should be chosen depends on the problem at hand, for example, whether social preferences should be taken into account in the decision of how much money to invest in conservation or whether the available conservation budget is strictly limited. © 2016 Society for Conservation Biology.

  10. Budgeting for Efficiency and Effectiveness

    ERIC Educational Resources Information Center

    Pereus, Steven C.

    2012-01-01

    For most districts, budgeting has become a cost-cutting exercise designed to close the gap between revenues and expenses. During this process, decision makers inherently assume that existing operations are efficient and effective--an assumption that is rarely validated by facts. Cutting programs and services balances budgets but does not…

  11. Fiscal Year 2007 Budget Press Conference

    NASA Image and Video Library

    2006-02-06

    NASA Associate Administrator for Aeronautics Research Lisa J. Porter answers reporters questions during the fiscal year 2007 news conference, Monday, Feb. 6, 2006, at NASA Headquarters in Washington. NASA Administrator Michael Griffin was joined by the heads of NASA's four mission directorates to explain how the proposed $16.8 billion dollar budget supports the Vision for Space Exploration. The budget represents a 3.2% increase above the fiscal year 2006 appropriated budget. Photo Credit: (NASA/Bill Ingalls)

  12. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  13. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  14. 42 CFR 441.470 - Service budget elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Service budget elements. 441.470 Section 441.470... Optional Self-Directed Personal Assistance Services Program § 441.470 Service budget elements. A service budget must be developed and approved by the State based on the assessment of need and service plan and...

  15. 40 CFR 60.4140 - State trading budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false State trading budgets. 60.4140 Section... Electric Steam Generating Units Hg Allowance Allocations § 60.4140 State trading budgets. The State trading budgets for annual allocations of Hg allowances for the control periods in 2010 through 2017 and in 2018...

  16. 12 CFR 995.6 - Budget and expenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Budget and expenses. 995.6 Section 995.6 Banks... § 995.6 Budget and expenses. (a) Directorate approval. The Financing Corporation shall submit annually to the Directorate for approval, a budget of proposed expenditures for the next calendar year that...

  17. Development of Ocean Noise "Budgets"

    NASA Astrophysics Data System (ADS)

    D'Spain, G. L.; Miller, J. H.; Frisk, G. V.; Bradley, D. L.

    2003-12-01

    The National Oceanographic Partnership Program recently sponsored the third U.S. National Academy of Sciences study on the potential impact of manmade sound on the marine environment. Several recommendations for future research are made by the 11-member committee in their report titled Ocean Noise and Marine Mammals (National Academies Press, 2003). This presentation will focus on the subset of recommendations related to a "noise budget", i.e., an accounting of the relative contributions of various sources to the ocean noise field. A noise budget is defined in terms of a specific metric of the sound field. The metric, or budget "currency", typically considered is the acoustic pressure spectrum integrated over space and time, which is proportional to the total mechanical energy in the acoustic field. However, this currency may not be the only one of relevance to marine animals. Each of the various ways in which sound can potentially impact these animals, e.g., temporary threshold shift, masking, behavior disruption, etc, probably depends upon a different property, or set of properties, of the sound field. Therefore, a family of noise budgets based on various currencies will be required for complete evaluation of the potential impact of manmade noise on the marine environment. Validation of noise budgets will require sustained, long term measurements of the underwater noise field.

  18. Budget Increases Proposed for NOAA and Energy Department

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2009-05-01

    In addition to the Obama administration's proposed budget increases for NASA, the Environmental Protection Agency, and the U.S. Geological Survey (see Eos, 90(10), 83, 2009, and 90(20), 175, 2009), other federal Earth and space science agencies also would receive boosts in the proposed fiscal year (FY) 2010 budget. The proposed budget comes on top of the 2009 American Recovery and Reinvestment Act's (ARRA) US$18.3 billion in stimulus spending for research and development that can be apportioned between the FY 2009 and FY 2010 budgets. This news item focuses on the budget proposals for the National Oceanic and Atmospheric Administration (NOAA) and the Department of Energy (DOE). Next week, Eos will look at the budget proposal for the National Science Foundation.

  19. Education Takes Hit in Budgets

    ERIC Educational Resources Information Center

    Cavanagh, Sean

    2011-01-01

    After months of arduous negotiation and partisan squabbling, states across the country have produced budgets for the new fiscal year that in many cases will bring deep cuts to state spending, including money for schools. The budget blueprints adopted by numerous states were postscripts to divisive legislative sessions that saw newly elected…

  20. Parametric Cost and Schedule Modeling for Early Technology Development

    DTIC Science & Technology

    2018-04-02

    Best Paper in the Analysis Methods Category and 2017 Best Paper Overall awards. It was also presented at the 2017 NASA Cost and Schedule Symposium... Methods over the Project Life Cycle .............................................................................................. 2 Figure 2. Average...information contribute to the lack of data, objective models, and methods that can be broadly applied in early planning stages. Scientific

  1. Budget Reform to Improve Higher Education Quality.

    ERIC Educational Resources Information Center

    Folger, John

    A national project designed to examine issues of budget reform and quality improvement in higher education is described. The focus is state-level budget practices and their impact on institutions. Most of the funding for quality improvement has been categorical: a small percent of the budget is set aside to achieve particular quality or…

  2. 40 CFR 97.340 - State trading budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false State trading budgets. 97.340 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.340 State trading budgets. (a) Except as provided in paragraph (b) of this section, the State...

  3. 40 CFR 97.340 - State trading budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false State trading budgets. 97.340 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.340 State trading budgets. (a) Except as provided in paragraph (b) of this section, the State...

  4. 40 CFR 97.340 - State trading budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false State trading budgets. 97.340 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.340 State trading budgets. (a) Except as provided in paragraph (b) of this section, the State...

  5. 40 CFR 97.340 - State trading budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false State trading budgets. 97.340 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.340 State trading budgets. (a) Except as provided in paragraph (b) of this section, the State...

  6. An Annotated Bibliography: Budgeting in Higher Education.

    ERIC Educational Resources Information Center

    Emery, Rebecca A.

    Though the original focus of this annotated bibliography was upon budgeting in the public community college, its scope was expanded to include articles on budgeting in four-year colleges and in some private two- and four-year institutions when the articles were relevant to community colleges. Due to the inter-relationship between budgeting and…

  7. 40 CFR 97.340 - State trading budgets.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 97.340 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.340 State trading budgets. (a) Except as provided in paragraph (b) of this section, the State...

  8. Best practices for budget-based design.

    DOT National Transportation Integrated Search

    2017-03-01

    State Departments of Transportation (State DOTs) encounter difficulties in establishing feasible and : reliable project budget early in the project development. The lack of a systematic process for establishing : baseline budget with the consideratio...

  9. An Extended Deterministic Dendritic Cell Algorithm for Dynamic Job Shop Scheduling

    NASA Astrophysics Data System (ADS)

    Qiu, X. N.; Lau, H. Y. K.

    The problem of job shop scheduling in a dynamic environment where random perturbation exists in the system is studied. In this paper, an extended deterministic Dendritic Cell Algorithm (dDCA) is proposed to solve such a dynamic Job Shop Scheduling Problem (JSSP) where unexpected events occurred randomly. This algorithm is designed based on dDCA and makes improvements by considering all types of signals and the magnitude of the output values. To evaluate this algorithm, ten benchmark problems are chosen and different kinds of disturbances are injected randomly. The results show that the algorithm performs competitively as it is capable of triggering the rescheduling process optimally with much less run time for deciding the rescheduling action. As such, the proposed algorithm is able to minimize the rescheduling times under the defined objective and to keep the scheduling process stable and efficient.

  10. FY2013 Defense Budget Request: Overview and Context

    DTIC Science & Technology

    2012-04-20

    Prescribed by ANSI Std Z39-18 FY2013 Defense Budget Request: Overview and Context Congressional Research Service Summary This report analyzes ...Congressional action on the FY2013 defense budget will be analyzed in a separate report. The FY2013 Department of Defense (DOD) budget request...defense-related nuclear programs conducted by the Department of Energy , and other activities. For discretionary DOD budget authority, the request includes

  11. 40 CFR 97.40 - Trading program budget.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false Trading program budget. 97.40 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Allocations § 97.40 Trading program budget. In accordance with §§ 97.41 and 97.42, the Administrator will allocate to the NOX...

  12. 40 CFR 97.40 - Trading program budget.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false Trading program budget. 97.40 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Allocations § 97.40 Trading program budget. In accordance with §§ 97.41 and 97.42, the Administrator will allocate to the NOX...

  13. 40 CFR 97.40 - Trading program budget.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false Trading program budget. 97.40 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Allocations § 97.40 Trading program budget. In accordance with §§ 97.41 and 97.42, the Administrator will allocate to the NOX...

  14. 40 CFR 97.40 - Trading program budget.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false Trading program budget. 97.40 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Allocations § 97.40 Trading program budget. In accordance with §§ 97.41 and 97.42, the Administrator will allocate to the NOX...

  15. 40 CFR 97.40 - Trading program budget.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Trading program budget. 97.40 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Allocations § 97.40 Trading program budget. In accordance with §§ 97.41 and 97.42, the Administrator will allocate to the NOX...

  16. Health Cost Strain School Budgets

    ERIC Educational Resources Information Center

    Sack, Joetta L.

    2004-01-01

    This article describes how the rising cost of health insurance is being picked as the top budget concern of school businesses. These data were the result of a survey conducted by the Association of School Business Officials International. Schools report that the cost of insuring employees is outpacing increases in state and local budgets that…

  17. Budgeting Based on Student Needs

    ERIC Educational Resources Information Center

    Willis, Jason; Hill, Matt

    2011-01-01

    School finance reform has become a key component for transforming public schools in the United States. Over the last decade, a growing number of districts have turned to an approach known by different names--student-based budgeting, weighted student funding and fair student funding, among others--in which budgets are allocated to schools in…

  18. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... related performance budgets, resources, and schedules. It should provide a mutual understanding of the inherent risks in offerors'/contractors' performance plans and the underlying management control systems... objectives of the scope of work; (2) Adequacy of the time allocated for performing the defined tasks to...

  19. 1993 Wholesale Power and Transmission Rate Schedules.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  20. National Science Foundation proposed budget could see another increase

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-03-01

    President Barack Obama's proposed budget for the U.S. National Science Foundation (NSF) for fiscal year (FY) 2013 would provide the agency with $7.37 billion, a $340 million increase, 4.8% above the FY 2012 estimated budget under which NSF has been operating. NSF has fared well during previous budget cycles, and the Obama administration's budget document for FY 2013 states that “NSF plays a critical role in the implementation of the President's Plan for Science and Technology.” With federal agencies operating under tighter budgets in a difficult financial climate, NSF director Subra Suresh said the budget includes substantial increases for core programs, frontier science, education, and human resources. “I am confident that NSF merits the $7.4 billion the president proposed. I'm optimistic Congress will approve the budget,” Suresh said at a 13 February NSF budget briefing.

  1. A case study of resources management planning with multiple objectives and projects

    NASA Astrophysics Data System (ADS)

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  2. The Development of Patient Scheduling Groups for an Effective Appointment System

    PubMed Central

    2016-01-01

    Summary Background Patient access to care and long wait times has been identified as major problems in outpatient delivery systems. These aspects impact medical staff productivity, service quality, clinic efficiency, and health-care cost. Objectives This study proposed to redesign existing patient types into scheduling groups so that the total cost of clinic flow and scheduling flexibility was minimized. The optimal scheduling group aimed to improve clinic efficiency and accessibility. Methods The proposed approach used the simulation optimization technique and was demonstrated in a Primary Care physician clinic. Patient type included, emergency/urgent care (ER/UC), follow-up (FU), new patient (NP), office visit (OV), physical exam (PE), and well child care (WCC). One scheduling group was designed for this physician. The approach steps were to collect physician treatment time data for each patient type, form the possible scheduling groups, simulate daily clinic flow and patient appointment requests, calculate costs of clinic flow as well as appointment flexibility, and find the scheduling group that minimized the total cost. Results The cost of clinic flow was minimized at the scheduling group of four, an 8.3% reduction from the group of one. The four groups were: 1. WCC, 2. OV, 3. FU and ER/UC, and 4. PE and NP. The cost of flexibility was always minimized at the group of one. The total cost was minimized at the group of two. WCC was considered separate and the others were grouped together. The total cost reduction was 1.3% from the group of one. Conclusions This study provided an alternative method of redesigning patient scheduling groups to address the impact on both clinic flow and appointment accessibility. Balance between them ensured the feasibility to the recognized issues of patient service and access to care. The robustness of the proposed method on the changes of clinic conditions was also discussed. PMID:27081406

  3. Analyzing Content about the Federal Budget, National Debt, and Budget Deficit in High School and College-Level Economics Textbooks

    ERIC Educational Resources Information Center

    Marri, Anand R.; Gaudelli, William; Cohen, Aviv; Siegel, Brad; Wylie, Scott; Crocco, Margaret S.; Grolnick, Maureen

    2012-01-01

    This study sought to identify content on the federal budget, national debt, and budget deficit in the 12 most commonly used high school and college-level economics textbooks. Our systematic review of these sources leads to two key findings: (1) Textbooks are similar in how they represent fiscal policy yet treat the federal budget, deficit, and…

  4. Budget Cuts: Financial Aid Offices Face Budget Cuts and Increasing Workload. Quick Scan Survey Results

    ERIC Educational Resources Information Center

    National Association of Student Financial Aid Administrators (NJ1), 2010

    2010-01-01

    The majority of college financial aid offices have seen cuts to their operating budgets this year compared to the 2007-08 academic year when the recession began, according to the National Association of Student Financial Aid Administrator's latest QuickScan Survey. Sixty-two percent of financial aid offices reported operating budget cuts this year…

  5. A subjective scheduler for subjective dedicated networks

    NASA Astrophysics Data System (ADS)

    Suherman; Fakhrizal, Said Reza; Al-Akaidi, Marwan

    2017-09-01

    Multiple access technique is one of important techniques within medium access layer in TCP/IP protocol stack. Each network technology implements the selected access method. Priority can be implemented in those methods to differentiate services. Some internet networks are dedicated for specific purpose. Education browsing or tutorial video accesses are preferred in a library hotspot, while entertainment and sport contents could be subjects of limitation. Current solution may use IP address filter or access list. This paper proposes subjective properties of users or applications are used for priority determination in multiple access techniques. The NS-2 simulator is employed to evaluate the method. A video surveillance network using WiMAX is chosen as the object. Subjective priority is implemented on WiMAX scheduler based on traffic properties. Three different traffic sources from monitoring video: palace, park, and market are evaluated. The proposed subjective scheduler prioritizes palace monitoring video that results better quality, xx dB than the later monitoring spots.

  6. Defense.gov Special Report: Fiscal Budget

    Science.gov Websites

    Request for Fiscal Year 2012 Air Force Budget Targets Efficiencies, Balance Budget Summary Summary of the Transcripts Gates' Opening Summary Secretary Gates Under Secretary Hale and Lt. Gen. Spencer Army Maj. Gen

  7. Preparation of School District Budgets with Microcomputer Electronic Spreadsheets.

    ERIC Educational Resources Information Center

    Hinitz, Herman J.; Gourley, Marlene Fisher, Ed.

    1996-01-01

    School districts prepare annual budgets in order to have adequate funding available for their operations. Today's budgets require flexibility and adaptability as school-district finances and governmental regulations and guidelines change. This article discusses several types of budgets and budget preparation that utilize microcomputer technology.…

  8. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  9. Optimal load scheduling in commercial and residential microgrids

    NASA Astrophysics Data System (ADS)

    Ganji Tanha, Mohammad Mahdi

    Residential and commercial electricity customers use more than two third of the total energy consumed in the United States, representing a significant resource of demand response. Price-based demand response, which is in response to changes in electricity prices, represents the adjustments in load through optimal load scheduling (OLS). In this study, an efficient model for OLS is developed for residential and commercial microgrids which include aggregated loads in single-units and communal loads. Single unit loads which include fixed, adjustable and shiftable loads are controllable by the unit occupants. Communal loads which include pool pumps, elevators and central heating/cooling systems are shared among the units. In order to optimally schedule residential and commercial loads, a community-based optimal load scheduling (CBOLS) is proposed in this thesis. The CBOLS schedule considers hourly market prices, occupants' comfort level, and microgrid operation constraints. The CBOLS' objective in residential and commercial microgrids is the constrained minimization of the total cost of supplying the aggregator load, defined as the microgrid load minus the microgrid generation. This problem is represented by a large-scale mixed-integer optimization for supplying single-unit and communal loads. The Lagrangian relaxation methodology is used to relax the linking communal load constraint and decompose the independent single-unit functions into subproblems which can be solved in parallel. The optimal solution is acceptable if the aggregator load limit and the duality gap are within the bounds. If any of the proposed criteria is not satisfied, the Lagrangian multiplier will be updated and a new optimal load schedule will be regenerated until both constraints are satisfied. The proposed method is applied to several case studies and the results are presented for the Galvin Center load on the 16th floor of the IIT Tower in Chicago.

  10. Factors associated with attendance to scheduled outpatient endoscopy

    PubMed Central

    Laiyemo, Adeyinka O.; Williams, Carla D.; Burnside, Clinton; Moghadam, Sepideh; Sanasi-Bhola, Kamla D.; Kwagyan, John; Brim, Hassan; Ashktorab, Hassan; Scott, Victor F.; Smoot, Duane T.

    2015-01-01

    Background Non-attendance of 42% has been reported for outpatient colonoscopy among persons with low socioeconomic status (SES) in an open access system in the United States. Objectives To evaluate attendance to outpatient endoscopy among populations with low SES after in-person consultations with endoscopists prior to scheduling. Methods Retrospectively, we reviewed the endoscopy schedule from September 2009 to August 2010 in an inner city teaching hospital in Washington DC. We identified patients who came for their procedures. We defined non-attendance as when patients did not notify the facility up to 24 hours prior to their scheduled procedures and did not show up . Results A total of 3,304 patients were scheduled for outpatient endoscopy (mean age 55.2 years; 59.5% females). Only 36 (1.1%) patients were uninsured. 716 (21.7%) patients did not show up for their procedures. There were no differences in attendance by age, sex and race. Patients seen in a private endoscopist's office (OR=1.47; 95%CI: 1.07–2.04) were more likely to attend when compared to patients seen in trainees’ continuity clinic. Married patients (OR=1.40; 95%CI: 1.11–1.78) were also more likely to attend. Conversely, Medicaid and uninsured patients were less likely to attend. Restricting our analysis to patients scheduled for only colonoscopy yielded similar results except that patients who were 50 years and older were more likely to attend. Conclusions Our study suggests improved attendance to endoscopy when populations with lower SES undergo prior consultation with an endoscopist. There is a potential to further improve attendance to out-patient endoscopy by directly involving the social support of the patients. PMID:25180285

  11. The USDA's Healthy Eating on a Budget Program: Making Better Eating Decisions on a Budget

    ERIC Educational Resources Information Center

    Franklin, Alexandra M.; Hongu, Nobuko

    2016-01-01

    The U.S. Department of Agriculture has launched a new interactive online program titled Healthy Eating on a Budget. It is an addition to the popular ChooseMyPlate.gov programs, such as the SuperTracker program. The Healthy Eating on a Budget program helps consumers plan, purchase, and prepare healthful meals. This article discusses materials and…

  12. Global Budgeting in the OECD Countries

    PubMed Central

    Wolfe, Patrice R.; Moran, Donald W.

    1993-01-01

    Many of the Organization for Economic Cooperation and Development countries use global budgeting to control all or certain portions of their health care expenditures. Although the use of global budgets as a cost-containment tool has not been implemented in the United States in any comprehensive way, recent health care reform initiatives have increased the need for research into such tools. In general, the structure, process, and effectiveness of global budgets vary enormously from country to country, in part because the underlying social welfare system of each country is unique. PMID:10130584

  13. Complex ambulatory settings demand scheduling systems.

    PubMed

    Ross, K M

    1998-01-01

    Practice management systems are becoming more and more complex, as they are asked to integrate all aspects of patient and resource management. Although patient scheduling is a standard expectation in any ambulatory environment, facilities and equipment resource scheduling are additional functionalities of scheduling systems. Because these functions were not typically managed in manual patient scheduling, often the result was resource mismanagement, along with a potential negative impact on utilization, patient flow and provider productivity. As ambulatory organizations have become more seasoned users of practice management software, the value of resource scheduling has become apparent. Appointment scheduling within a fully integrated practice management system is recognized as an enhancement of scheduling itself and provides additional tools to manage other information needs. Scheduling, as one component of patient information management, provides additional tools in these areas.

  14. Budgeting for Higher Education and the Legislative Oversight Process.

    ERIC Educational Resources Information Center

    Southern Regional Education Board, Atlanta, GA.

    Five papers are presented from a legislative seminar on budgeting for higher education and the legislative oversight process. In "Budgeting: A University Perspective," Jack K. Williams addresses the preparation of an institutional budget, what legislators should know about budgets, plans for no-growth or retrenchment, and the importance…

  15. Budget of the U.S. Government, Fiscal Year 2017

    ERIC Educational Resources Information Center

    Office of Management and Budget, Executive Office of the President, 2016

    2016-01-01

    "Budget of the United States Government, Fiscal Year 2017" contains the Budget Message of the President, information on the President's priorities, and summary tables. President Obama's 2017 Budget makes critical investments while adhering to the bipartisan budget agreement he signed into the previous fall, and it lifts sequestration in…

  16. Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".

    PubMed

    Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine

    2016-07-01

    Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.

  17. Changing Schedules of Work: Patterns and Implications. Final Report.

    ERIC Educational Resources Information Center

    Glickman, Albert S.; Brown, Zenia H.

    The past few years have been highlighted by management experiments with variants of a 4-day week (particularly in the U.S.) and flexible working time schedules (particularly in Europe). These are illustrations of the changing patterns of work and free time that have begun to assume the status of a new technology, and which are the objects of study…

  18. Understanding London's Water Supply Tradeoffs When Scheduling Interventions Under Deep Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2015-12-01

    Water supply planning in many major world cities faces several challenges associated with but not limited to climate change, population growth and insufficient land availability for infrastructure development. Long-term plans to maintain supply-demand balance and ecosystem services require careful consideration of uncertainties associated with future conditions. The current approach for London's water supply planning utilizes least cost optimization of future intervention schedules with limited uncertainty consideration. Recently, the focus of the long-term plans has shifted from solely least cost performance to robustness and resilience of the system. Identifying robust scheduling of interventions requires optimizing over a statistically representative sample of stochastic inputs which may be computationally difficult to achieve. In this study we optimize schedules using an ensemble of plausible scenarios and assess how manipulating that ensemble influences the different Pareto-approximate intervention schedules. We investigate how a major stress event's location in time as well as the optimization problem formulation influence the Pareto-approximate schedules. A bootstrapping method that respects the non-stationary trend of climate change scenarios and ensures the even distribution of the major stress event in the scenario ensemble is proposed. Different bootstrapped hydrological scenario ensembles are assessed using many-objective scenario optimization of London's future water supply and demand intervention scheduling. However, such a "fixed" scheduling of interventions approach does not aim to embed flexibility or adapt effectively as the future unfolds. Alternatively, making decisions based on the observations of occurred conditions could help planners who prefer adaptive planning. We will show how rules to guide the implementation of interventions based on observations may result in more flexible strategies.

  19. SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

    NASA Technical Reports Server (NTRS)

    Thalman, Nancy E.; Sparn, Thomas P.

    1990-01-01

    SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

  20. Dispatch Scheduling of Automated Telescopes

    NASA Astrophysics Data System (ADS)

    Denny, R. B.

    2004-05-01

    Automated telescope scheduling systems have traditionally focused on optimiz- ing the use of the observatory, minimizing overhead and maximizing shutter- open time. However, educational and amateur observatories do not enjoy con- sistently good skies. Conditions can change significantly during an observing session, leading to schedule breakage. This gives rise to the need for a scheduling system that is capable of recovering from periods of bad skies, wind, etc. without operator intervention. The concept of dispatch scheduling, where the scheduler makes a "best" choice for the next observation, will be discussed. The choice of next target must consider constraints such as mini- mum altitude or maximum air mass, moon illumination, and sky condition, as well as timing constraints that may arise from linked observations and/or target phasing requirements. It also must be as fair and efficient as prac- tical. A dispatch scheduler (ACPS) was constructed and used to perform a num- ber of simulations with both isolated and multiple/linked observations, and noisy timing. By varying "best next target" choice algorithm, these simula- tions provided insight into the behavior of a dispatch scheduler. This talk will describe the scheduler and present the results of these preliminary sim- ulations, some conclusions that arose from them, and outline areas for fur- ther research.

  1. A hybrid dynamic harmony search algorithm for identical parallel machines scheduling

    NASA Astrophysics Data System (ADS)

    Chen, Jing; Pan, Quan-Ke; Wang, Ling; Li, Jun-Qing

    2012-02-01

    In this article, a dynamic harmony search (DHS) algorithm is proposed for the identical parallel machines scheduling problem with the objective to minimize makespan. First, an encoding scheme based on a list scheduling rule is developed to convert the continuous harmony vectors to discrete job assignments. Second, the whole harmony memory (HM) is divided into multiple small-sized sub-HMs, and each sub-HM performs evolution independently and exchanges information with others periodically by using a regrouping schedule. Third, a novel improvisation process is applied to generate a new harmony by making use of the information of harmony vectors in each sub-HM. Moreover, a local search strategy is presented and incorporated into the DHS algorithm to find promising solutions. Simulation results show that the hybrid DHS (DHS_LS) is very competitive in comparison to its competitors in terms of mean performance and average computational time.

  2. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budgets, programs, plans, and projects. 1219.50... Order Budgets, Expenses, and Assessments § 1219.50 Budgets, programs, plans, and projects. (a) The Board shall submit to the Secretary, on a fiscal period basis, annual budgets of its anticipated expenses and...

  3. Health sector operational planning and budgeting processes in Kenya—“never the twain shall meet”

    PubMed Central

    Molyneux, Sassy; Goodman, Catherine

    2015-01-01

    Summary Operational planning is considered an important tool for translating government policies and strategic objectives into day‐to‐day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top‐down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local‐level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. PMID:25783862

  4. Science budget bills wind through U.S. Congress

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    With the U.S. economy booming and the science community pushing for across the board increases for federal research and development programs, science budgets are faring well in the House and Senate. When Congress returns to Washington in September following a summer recess, its priorities include finalizing four major, nondefense budget bills that affect science. These bills could provide significant funding increases for fiscal year 1998.How do these number compare to the new balanced budget agreement? According to analysts, the budget for the next fiscal year actually increases, with precipitous cuts delayed for several years. Although the outlook for long-term funding may be grim, science budgets look good for this year.

  5. 7 CFR 3015.114 - Budgets-general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Budgets-general. 3015.114 Section 3015.114 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Programmatic Changes and Budget Revisions...

  6. 7 CFR 3015.115 - Budget revisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Budget revisions. 3015.115 Section 3015.115 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Programmatic Changes and Budget Revisions...

  7. Defense Primer: The National Defense Budget Function (050)

    DTIC Science & Technology

    2017-03-17

    in parenthesis). This defense primer addresses the National Defense Budget (050), which is frequently used to explain trends in military spending...but which also includes some activities not conducted by the Department of Defense. What Is the Purpose of the Budget Function System? The budget

  8. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget. ...

  9. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  10. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    ERIC Educational Resources Information Center

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  11. Fiscal 1982 Budget highlights R&D

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.

    Geophysical research and development programs show growth beyond inflation in the $739.3 billion budget for fiscal 1982 that Jimmy Carter sent to Congress 5 days before completing his term. Included in the budget are provisions for increased support for the Ocean Margin Drilling Program and funds for an interagency Geological Applications Program, funds for an agriculture and resource surveys program that relies on remote sensing, and funds for the Venus Orbiting Imaging Radar mission.Ronald Reagan is expected to make changes in the budget as early as late February, although in mid January the heads of the scientific agencies could not characterize possible changes. Some Washingtonians say sharp cuts are inevitable, with basic research a prime candidate. Others, however, contend that the Reagan administration's push for productivity and innovation could prevent severe carving. Eos will track the FY 1982 budget changes through congressional approval.

  12. School Budgeting and School Performance: The Impact of New York City's Performance Driven Budgeting Initiative.

    ERIC Educational Resources Information Center

    Stiefel, Leanna; Schwartz, Amy Ellen; Portas, Carole; Kim, Dae Yeop

    2003-01-01

    Analyzes the impact of Performance Driven Budgeting (PDB), a school-based budgeting initiative, on student test scores in the fourth and fifth grades and on spending patterns in selected New York City schools. Finds that PDB has a positive effect on some student test scores and leads to a change in the mix of spending, but not its level. (Contains…

  13. Kuiper Belt Objects Along the Pluto Express Path

    NASA Technical Reports Server (NTRS)

    Jewitt, David C.

    1998-01-01

    The science objective of this work was to identify objects in the Kuiper Belt which will, in the 5 years following Pluto encounter, be close to the flight path of NASA's Pluto-Kuiper Express. Currently, launch is scheduled for 2004 with a flight time of about 1 decade. Early identification of post-Pluto targets is important for mission design and orbit refinement. An object or objects close enough to the flight path can be visited and studied at high resolution, using only residual gas in the thrusters to affect a close encounter.

  14. 14 CFR 1260.125 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Revision of budget and program plans. 1260....125 Revision of budget and program plans. (a) The budget plan is the financial expression of the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  15. 25 CFR 1000.105 - What are self-governance base budgets?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What are self-governance base budgets? 1000.105 Section... Base Budgets § 1000.105 What are self-governance base budgets? (a) A Tribe/Consortium self-governance base budget is the amount of recurring funding identified in the President's annual budget request to...

  16. 28 CFR 70.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Revision of budget and program plans. 70... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... from budget and program plans, and request prior approvals for budget and program plan revisions, in...

  17. 24 CFR 84.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Revision of budget and program... and Program Management § 84.25 Revision of budget and program plans. (a) The budget plan is the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  18. 45 CFR 2543.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Revision of budget and program plans. 2543.25... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... deviations from budget and program plans, and request prior approvals for budget and program plan revisions...

  19. Observed Budgets for the Global Climate

    NASA Astrophysics Data System (ADS)

    Kottek, M.; Haimberger, L.; Rubel, F.; Hantel, M.

    2003-04-01

    A global dataset for selected budget quantities specifying the present climate for the period 1991-1995 has been compiled. This dataset is an essential component of the new climate volume within the series Landolt Boernstein - Numerical Data and Functional Relationships in Science and Technology, to be published this year. Budget quantities are those that appear in a budget equation. Emphasis in this collection is placed on observational data of both in situ and remotely sensed quantities. The fields are presented as monthly means with a uniform space resolution of one degree. Main focus is on climatologically relevant state and flux quantities at the earth's surface and at the top of atmosphere. Some secondary and complex climate elements are also presented (e.g. tornadoe frequency). The progress of this collection as compared to other climate datasets is, apart from the quality of the input data, that all fields are presented in standardized form as far as possible. Further, visualization loops of the global fields in various projections will be available for the user in the eventual book. For some budget quantities, e.g. precipitation, it has been necessary to merge data from different sources; insufficiently observed parameters have been supplemented through the ECMWF ERA-40 reanalyses. If all quantities of a budget have been evaluated the gross residual represents an estimate of data quality. For example, the global water budget residual is found to be up to 30 % depending on the used data. This suggests that the observation of global climate parameters needs further improvement.

  20. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  1. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  2. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  3. 40 CFR 52.2532 - Motor vehicle emissions budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Motor vehicle emissions budgets. 52... vehicle emissions budgets. (a) EPA approves the following revised 2009 and 2018 motor vehicle emissions... 2018 motor vehicle emissions budgets (MVEBs) for the Huntington, West Virginia 8-hour ozone maintenance...

  4. 40 CFR 52.2424 - Motor vehicle emissions budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Motor vehicle emissions budgets. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2424 Motor vehicle emissions budgets. (a) Motor vehicle emissions budget for the Hampton Roads maintenance area adjusting the...

  5. 40 CFR 45.140 - Budget and project period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Budget and project period. 45.140 Section 45.140 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRAINING ASSISTANCE § 45.140 Budget and project period. The budget and project periods for...

  6. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  7. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  8. FY 1986 science budget overview

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.; Robb, David W.

    Continental lithosphere research, scientific ocean drilling, investigative surveys in the Exclusive Economic Zone, and the Mars Observer were among those programs that fared best in the federal budget proposal for fiscal year (FY) 1986 that President Ronald Reagan sent to Congress last week. However, the Sea Grant and Coastal Zone Management programs were among those that fell victim to the budget ax once again.

  9. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... the serious health condition of a covered family member or the employee or the serious injury or...

  10. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  11. Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft

    NASA Technical Reports Server (NTRS)

    Kleiner, Steven C.

    1996-01-01

    Work is progressing as outlined in the proposal for this contract. A working planning and scheduling system has been documented and packaged and made available to the WIRE Small Explorer group at JPL, the FUSE group at JHU, the NASA/GSFC Laboratory for Astronomy and Solar Physics and the Advanced Planning and Scheduling Branch at STScI. The package is running successfully on the WIRE computer system. It is expected that the WIRE will reuse significant portions of the SWAS code in its system. This scheduling system itself was tested successfully against the spacecraft hardware in December 1995. A fully automatic scheduling module has been developed and is being added to the toolkit. In order to maximize reuse, the code is being reorganized during the current build into object-oriented class libraries. A paper describing the toolkit has been written and is included in the software distribution. We have experienced interference between the export and production versions of the toolkit. We will be requesting permission to reprogram funds in order to purchase a standalone PC onto which to offload the export version.

  12. Scheduling Jobs with Variable Job Processing Times on Unrelated Parallel Machines

    PubMed Central

    Zhang, Guang-Qian; Wang, Jian-Jun; Liu, Ya-Jing

    2014-01-01

    m unrelated parallel machines scheduling problems with variable job processing times are considered, where the processing time of a job is a function of its position in a sequence, its starting time, and its resource allocation. The objective is to determine the optimal resource allocation and the optimal schedule to minimize a total cost function that dependents on the total completion (waiting) time, the total machine load, the total absolute differences in completion (waiting) times on all machines, and total resource cost. If the number of machines is a given constant number, we propose a polynomial time algorithm to solve the problem. PMID:24982933

  13. Space shuttle system program definition. Volume 4: Cost and schedule report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The supporting cost and schedule data for the second half of the Space Shuttle System Phase B Extension Study is summarized. The major objective for this period was to address the cost/schedule differences affecting final selection of the HO orbiter space shuttle system. The contending options under study included the following booster launch configurations: (1) series burn ballistic recoverable booster (BRB), (2) parallel burn ballistic recoverable booster (BRB), (3) series burn solid rocket motors (SRM's), and (4) parallel burn solid rocket motors (SRM's). The implications of varying payload bay sizes for the orbiter, engine type for the ballistics recoverable booster, and SRM motors for the solid booster were examined.

  14. Agreement on FY 1990 budget plan

    NASA Astrophysics Data System (ADS)

    The Bush administration has reached agreement with congressional leaders over a thumbnail version of the Fiscal Year 1990 budget. The plan contains few details but could have implications for NASA's Space Station Freedom and other big science projects.Overall, the budget agreement would achieve Gramm-Rudman-Hollings targets for budget deficit reduction without raising taxes, mostly through accounting manipulation and unspecified cuts in social programs. But a supplemental bill that calls for $1.2 billion in new spending for FY 1989 is expected to go to the House floor soon. That measure would violate the new agreement and add to the deficit.

  15. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State agency program budget plans. 653.112... State agency program budget plans. (a) Each State agency, in its annual program budget plan, shall... and Budget under control number 1205-0039) (Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq...

  16. Belgian guidelines for budget impact analyses.

    PubMed

    Neyt, M; Cleemput, I; Sande, S Van De; Thiry, N

    2015-06-01

    To develop methodological guidelines for budget impact analysis submitted to the Belgian health authorities as part of a reimbursement request. A review of the literature was performed and provided the basis for preliminary budget impact guidelines. These guidelines were improved after discussion with health economists from the Belgian Health Care Knowledge Centre (KCE) and different Belgian stakeholders from both government and industry. Preliminary guidelines were also discussed in a workshop with health economists from The German Institute for Quality and Efficiency in Healthcare. Finally, the guidelines were also externally validated by three external experts. The guidelines give explicit guidance for the following components of a budget impact analysis: perspective of the evaluation, target population, comparator, costs, time horizon, modeling, handling uncertainty and discount rate. Special attention is given to handling varying target population sizes over time, applying a time horizon up to the steady state instead of short-term predictions, and similarities and differences between budget impact analysis and economic evaluations. The guidelines provide a framework for both researchers and assessors to set up budget impact analyses that are transparent, relevant, of high quality and apply a consistent methodology. This might improve the extent to which such evaluations can reliably and consistently be used in the reimbursement decision making process.

  17. Key Questions on the Obama Administration's 2013 Education Budget Request: Federal Education Budget Project. Issue Brief

    ERIC Educational Resources Information Center

    New America Foundation, 2012

    2012-01-01

    President Barack Obama submitted his third budget request to Congress on February 13th, 2012. The budget request includes proposed funding levels for all federal programs and agencies in aggregate for the upcoming 10 fiscal years, and specific fiscal year 2013 funding levels for programs subject to the annual appropriations process. It is…

  18. Linking Planning and Budgeting through Business Process Redesign.

    ERIC Educational Resources Information Center

    Inman, Marianne E.

    In the wake of an extensive strategic planning process that refocused institutional values at Northland College, Wisconsin, the administration undertook linking the budget with the newly articulated plan. Incremental budgeting was no longer feasible, and the new budget would have to reflect streamlining and new ways of functioning. Consequently…

  19. 40 CFR 52.244 - Motor vehicle emissions budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Motor vehicle emissions budgets. 52.244... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.244 Motor vehicle emissions budgets. (a) Approval of the motor vehicle emissions budgets for the following ozone rate-of-progress and...

  20. 24 CFR 990.300 - Preparation of operating budget.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Preparation of operating budget... Resident Management Corporations (RMCs) § 990.300 Preparation of operating budget. (a) The RMC and the PHA must submit operating budgets and calculations of operating subsidy to HUD for approval in accordance...