Sample records for observation schedule ados

  1. [Polish version of the ADOS (autism diagnostic observation schedule-generic)].

    PubMed

    Chojnicka, Izabela; Płoski, Rafał

    2012-01-01

    The article presents the Polish version of the autism diagnostic observation schedule-generic (ADOS), which together with the autism diagnostic interview-revised (ADI-R) is cited as the "gold standard" for the diagnosis of autism. The ADOS is a standardised, semistructured observation protocol appropriate for children and adults of differing age and language levels. It is linked to ICD-10 and DSM-IV-TR criteria. The ADOS consists of four modules, ranging from module 1 for nonverbal individuals to module 4 for verbally fluent adults. The adequate inter-rater reliability for items has been established. The protocol has high discriminant validity and distinguishes children with pervasive developmental disorders from children, who are outside of the spectrum. Although it does not enable to distinguish individuals with pervasive developmental disorder, unspecified from individuals with childhood autism. The paper presents subsequent steps of the translation process of the original version into Polish, as well as a chosen adaptation strategy of the Polish version. The ADOS is a very useful tool both for clinical diagnosis and for the scientific purpose diagnosis. In this last case it is extremely important to use a standardised method. Until now, there was no standardised diagnostic tool for autism in Poland.

  2. Diagnosing Autism Spectrum Disorders in Adults: The Use of Autism Diagnostic Observation Schedule (ADOS) Module 4

    ERIC Educational Resources Information Center

    Bastiaansen, Jojanneke A.; Meffert, Harma; Hein, Simone; Huizinga, Petra; Ketelaars, Cees; Pijnenborg, Marieke; Bartels, Arnold; Minderaa, Ruud; Keysers, Christian; de Bildt, Annelies

    2011-01-01

    Autism Diagnostic Observation Schedule (ADOS) module 4 was investigated in an independent sample of high-functioning adult males with an autism spectrum disorder (ASD) compared to three specific diagnostic groups: schizophrenia, psychopathy, and typical development. ADOS module 4 proves to be a reliable instrument with good predictive value. It…

  3. Usability and reliability of a remotely administered adult autism assessment, the autism diagnostic observation schedule (ADOS) module 4.

    PubMed

    Schutte, Jamie L; McCue, Michael P; Parmanto, Bambang; McGonigle, John; Handen, Benjamin; Lewis, Allen; Pulantara, I Wayan; Saptono, Andi

    2015-03-01

    The Autism Diagnostic Observation Schedule (ADOS) Module 4 is an autism assessment designed for verbally fluent adolescents and adults. Because of a shortage of available clinical expertise, it can be difficult for adults to receive a proper autism spectrum disorder (ASD) diagnostic assessment. A potential option to address this shortage is remote assessment. The objective of this study was to examine the feasibility, usability, and reliability of administering the ADOS Module 4 remotely using the Versatile and Integrated System for Telerehabilitation (VISYTER). VISYTER consists of computer stations at the client site and clinician site for video communication and a Web portal for managing and coordinating the assessment process. Twenty-three adults with an ASD diagnosis participated in a within-subject crossover design study in which both a remote ADOS and a face-to-face ADOS were administered. After completing the remote ADOS, participants completed a satisfaction survey. Participant satisfaction with the remote ADOS delivery system was high. The kappa value was greater than 0.61 on 21 of 31 ADOS items. There was substantial agreement on ADOS classification (i.e., diagnosis) between assessments delivered face-to-face versus assessments delivered remotely (interclass coefficient=0.92). Non-agreement may have been due to outside factors or practice effect despite a washout period. The results of this study demonstrate that an autism assessment designed to be delivered face to face can be administered remotely using an integrated Web-based system with high levels of usability and reliability.

  4. Evaluation of the Revised Algorithm of Autism Diagnostic Observation Schedule (ADOS) in the Diagnostic Investigation of High-Functioning Children and Adolescents with Autism Spectrum Disorders

    ERIC Educational Resources Information Center

    Kamp-Becker, Inge; Ghahreman, Mardjan; Heinzel-Gutenbrunner, Monika; Peters, Mira; Remschmidt, Helmut; Becker, Katja

    2013-01-01

    The Autism Diagnostic Observation Schedule (ADOS) is a semi-structured, standardized assessment designed for use in diagnostic evaluation of individuals with suspected autism spectrum disorder (ASD). The ADOS has been effective in categorizing children who definitely have autism or not, but has lower specificity and sometimes sensitivity for…

  5. A Comparative Analysis of the ADOS-G and ADOS-2 Algorithms: Preliminary Findings.

    PubMed

    Dorlack, Taylor P; Myers, Orrin B; Kodituwakku, Piyadasa W

    2018-06-01

    The Autism Diagnostic Observation Schedule (ADOS) is a widely utilized observational assessment tool for diagnosis of autism spectrum disorders. The original ADOS was succeeded by the ADOS-G with noted improvements. More recently, the ADOS-2 was introduced to further increase its diagnostic accuracy. Studies examining the validity of the ADOS have produced mixed findings, and pooled relationship trends between the algorithm versions are yet to be analyzed. The current review seeks to compare the relative merits of the ADOS-G and ADOS-2 algorithms, Modules 1-3. Eight studies met inclusion criteria for the review, and six were selected for paired comparisons of the sensitivity and specificity of the ADOS. Results indicate several contradictory findings, underscoring the importance of further study.

  6. Interrelationship between Autism Diagnostic Observation Schedule-Generic (ADOS-G), Autism Diagnostic Interview-Revised (ADI-R), and the Diagnostic and Statistical Manual of Mental Disorders (DSM-IV-TR) Classification in Children and Adolescents with Mental Retardation

    ERIC Educational Resources Information Center

    de Bildt, Annelies; Sytema, Sjoerd; Ketelaars, Cees; Kraijer, Dirk; Mulder, Erik; Volkmar, Fred; Minderaa, Ruud

    2004-01-01

    The interrelationship between the Autism Diagnostic Interview-Revised (ADI-R), Autism Diagnostic Observation Schedule-Generic (ADOS-G) and clinical classification was studied in 184 children and adolescents with Mental Retardation (MR). The agreement between the ADI-R and ADOS-G was fair, with a substantial difference between younger and older…

  7. Test Review: Lord, C., Luyster, R. J., Gotham, K., & Guthrie, W. (2012). "Autism Diagnostic Observation Schedule, Second Edition (ADOS-2) Manual (Part II): Toddler Module." Torrance, CA: Western Psychological Services, 2012. Lord, C., Rutter, M., DiLavore, P. C., Risi, S., Gotham, K., & Bishop, S. "Autism Diagnostic Observation Schedule, Second Edition." Torrance, CA: Western Psychological Services, 2012

    ERIC Educational Resources Information Center

    McCrimmon, Adam; Rostad, Kristin

    2014-01-01

    This article reviews the "Autism Diagnostic Observation Schedule, Second Edition" (ADOS-2; Lord, Luyster, Gotham, & Guthrie, 2012; Lord, Rutter et al., 2012), a newly updated, semistructured, standardized measure of communication, social interaction, play/imagination, and restricted and/or repetitive behaviors published by Western…

  8. The Autism Diagnostic Observation Schedule, Toddler Module: Standardized Severity Scores

    ERIC Educational Resources Information Center

    Esler, Amy N.; Bal, Vanessa Hus; Guthrie, Whitney; Wetherby, Amy; Weismer, Susan Ellis; Lord, Catherine

    2015-01-01

    Standardized calibrated severity scores (CSS) have been created for Autism Diagnostic Observation Schedule, 2nd edition (ADOS-2) Modules 1-4 as a metric of the relative severity of autism-specific behaviors. Total and domain CSS were created for the Toddler Module to facilitate comparison to other modules. Analyses included 388 children with ASD…

  9. The Autism Diagnostic Observation Schedule--Toddler Module: A New Module of a Standardized Diagnostic Measure for Autism Spectrum Disorders

    ERIC Educational Resources Information Center

    Luyster, Rhiannon; Gotham, Katherine; Guthrie, Whitney; Coffing, Mia; Petrak, Rachel; Pierce, Karen; Bishop, Somer; Esler, Amy; Hus, Vanessa; Oti, Rosalind; Richler, Jennifer; Risi, Susan; Lord, Catherine

    2009-01-01

    The Autism Diagnostic Observation Schedule (ADOS; Lord et al., J Autism Dev Disord, 30(3):205-223, 2000) is widely accepted as a "gold standard" diagnostic instrument, but it is of restricted utility with very young children. The purpose of the current project was to modify the ADOS for use in children under 30 months of age. A modified ADOS, the…

  10. Adaptation and Validation of the ADOS-2, Polish Version

    PubMed Central

    Chojnicka, Izabela; Pisula, Ewa

    2017-01-01

    Autism Diagnostic Observation Schedule (ADOS) is one of the most popular instruments used world-widely in the diagnosis of autism spectrum disorders (ASD). Unfortunately, there are only a few studies of the psychometric properties of non-English language versions of this instrument and none of the adaptation of its second edition (ADOS-2). The objective of this study was to verify the psychometric properties of the Polish version of the Autism Diagnostic Observation Schedule, Second Edition (ADOS-2-PL). The authors recruited 401 participants: 193 with ASDs (ASD group) and 78 with non-spectrum disorders, plus 130 typically developing participants (control group). ADOS-2-PL was found to have high interrater reliability, internal consistency and test–retest reliability. Confirmatory factor analysis confirmed a good fit of the Polish data to the two-factor model of ADOS-2. As no significant differences were found between participants with childhood autism and other ASDs, only one cut-off was established for Modules 1–4. The sensitivity, specificity and positive predictive value of ADOS-2-PL are high: sensitivity was over 90% (only for the “Older with some words” algorithm in the Toddler Module the sensitivity was 71% and “Aged 5 years or older” algorithm in Module 2 sensitivity was 84%), specificity was above 80% (with the exception of the Module 4 and Module 2 “Aged 5 years or older” algorithm where it was above 70%). The results support the use of ADOS-2-PL in clinical practice and scientific research. To the best of our knowledge, there have been no reports to date about adaptations of ADOS-2 and the psychometric properties of non-English language versions. As such, this constitutes the first attempt at adapting ADOS-2, and its results could be of interest for researchers outside of Poland. PMID:29163293

  11. Examining the Role of Race, Ethnicity, and Gender on Social and Behavioral Ratings within the Autism Diagnostic Observation Schedule

    ERIC Educational Resources Information Center

    Harrison, Ashley J.; Long, Kristin A.; Tommet, Douglas C.; Jones, Richard N.

    2017-01-01

    The Autism Diagnostic Observation Schedule (ADOS) is widely used to assess symptoms of autism spectrum disorder (ASD). Given well-documented differences in social behaviors across cultures, this study examined whether item-level biases exist in ADOS scores across sociodemographic groups (race, ethnicity, and gender). We examined a subset of ten…

  12. The Autism Diagnostic Observation Schedule, Module 4: Revised Algorithm and Standardized Severity Scores

    ERIC Educational Resources Information Center

    Hus, Vanessa; Lord, Catherine

    2014-01-01

    The recently published Autism Diagnostic Observation Schedule, 2nd edition (ADOS-2) includes revised diagnostic algorithms and standardized severity scores for modules used to assess younger children. A revised algorithm and severity scores are not yet available for Module 4, used with verbally fluent adults. The current study revises the Module 4…

  13. Validity and Diagnostic Accuracy of Scores from the Autism Diagnostic Observation Schedule-Generic

    ERIC Educational Resources Information Center

    Reid, Melissa A.

    2012-01-01

    The purpose of this study was to examine the internal structure, relationships with other variables, and diagnostic accuracy of scores on the Autism Diagnostic Observation Schedule-Generic (ADOS-G; Lord et al., 1999) for the purpose of diagnostic decision-making. Participants were 462 children enrolled in a public school district in the southern…

  14. The Autism Diagnostic Observation Schedule, Toddler Module: Standardized Severity Scores

    PubMed Central

    Esler, Amy N.; Bal, Vanessa Hus; Guthrie, Whitney; Wetherby, Amy; Weismer, Susan Ellis; Lord, Catherine

    2016-01-01

    Standardized calibrated severity scores (CSS) have been created for Autism Diagnostic Observation Schedule, 2nd edition (ADOS-2) Modules 1–4 as a metric of the relative severity of autism-specific behaviors. Total and domain CSS were created for the Toddler Module to facilitate comparison to other modules. Analyses included 388 children with ASD age 12 to 30 months and were replicated on 435 repeated assessments from 127 children with ASD. Compared to raw scores, associations between total and domain CSS and participant characteristics were reduced in the original sample. Verbal IQ effects on Social Affect-CSS were not reduced in the replication sample. Toddler Module CSS increases comparability of ADOS-2 scores across modules and allows studies of symptom trajectories to extend to earlier ages. PMID:25832801

  15. The Role of the Autism Diagnostic Observation Schedule in the Assessment of Autism Spectrum Disorders in School and Community Settings.

    PubMed

    Akshoomoff, Natacha; Corsello, Christina; Schmidt, Heather

    2006-01-01

    Autism diagnostic practices among school and clinical psychologists, particularly those using the Autism Diagnostic Observation Schedule (ADOS), were examined using national survey results (N = 132). School and clinical psychologists were similar in following the Best Practice Guidelines for screening, diagnosis and assessment, School psychologists were more likely to include a school or home observation and teacher report than clinical psychologists but evaluated significantly fewer children with autism spectrum disorders per year compared to clinical psychologists. School psychologists who were ADOS users were more likely to consider themselves autism experts and include a review of records than ADOS non-users. Perceived advantages of the ADOS included its strength in capturing ASD-specific behaviors and the standardized structure provided for observation, while diagnostic discrimination and required resources were the most commonly identified disadvantages.

  16. The Accuracy of the ADOS-2 in Identifying Autism among Adults with Complex Psychiatric Conditions

    ERIC Educational Resources Information Center

    Maddox, Brenna B.; Brodkin, Edward S.; Calkins, Monica E.; Shea, Kathleen; Mullan, Katherine; Hostager, Jack; Mandell, David S.; Miller, Judith S.

    2017-01-01

    The Autism Diagnostic Observation Schedule, Second Edition (ADOS-2), Module 4 is considered a "gold-standard" instrument for diagnosing autism spectrum disorder (ASD) in adults. Although the ADOS-2 shows good sensitivity and specificity in lab-based settings, it is unknown whether these results hold in community clinics that serve a more…

  17. Improved Diagnostic Validity of the ADOS Revised Algorithms: A Replication Study in an Independent Sample

    ERIC Educational Resources Information Center

    Oosterling, Iris; Roos, Sascha; de Bildt, Annelies; Rommelse, Nanda; de Jonge, Maretha; Visser, Janne; Lappenschaar, Martijn; Swinkels, Sophie; van der Gaag, Rutger Jan; Buitelaar, Jan

    2010-01-01

    Recently, Gotham et al. ("2007") proposed revised algorithms for the Autism Diagnostic Observation Schedule (ADOS) with improved diagnostic validity. The aim of the current study was to replicate predictive validity, factor structure, and correlations with age and verbal and nonverbal IQ of the ADOS revised algorithms for Modules 1 and 2…

  18. The autism diagnostic observation schedule, module 4: revised algorithm and standardized severity scores.

    PubMed

    Hus, Vanessa; Lord, Catherine

    2014-08-01

    The recently published Autism Diagnostic Observation Schedule, 2nd edition (ADOS-2) includes revised diagnostic algorithms and standardized severity scores for modules used to assess younger children. A revised algorithm and severity scores are not yet available for Module 4, used with verbally fluent adults. The current study revises the Module 4 algorithm and calibrates raw overall and domain totals to provide metrics of autism spectrum disorder (ASD) symptom severity. Sensitivity and specificity of the revised Module 4 algorithm exceeded 80 % in the overall sample. Module 4 calibrated severity scores provide quantitative estimates of ASD symptom severity that are relatively independent of participant characteristics. These efforts increase comparability of ADOS scores across modules and should facilitate efforts to examine symptom trajectories from toddler to adulthood.

  19. The Accuracy of the ADOS-2 in Identifying Autism among Adults with Complex Psychiatric Conditions

    PubMed Central

    Maddox, Brenna B.; Brodkin, Edward S.; Calkins, Monica E.; Shea, Kathleen; Mullan, Katherine; Hostager, Jack; Mandell, David S.; Miller, Judith S.

    2018-01-01

    The Autism Diagnostic Observation Schedule, Second Edition (ADOS-2), Module 4 is considered a “gold-standard” instrument for diagnosing autism spectrum disorder (ASD) in adults. Although the ADOS-2 shows good sensitivity and specificity in lab-based settings, it is unknown whether these results hold in community clinics that serve a more psychiatrically impaired population. This study is the first to evaluate the diagnostic accuracy of the ADOS-2 among adults in community mental health centers (n = 75). The ADOS-2 accurately identified all adults with ASD; however, it also had a high rate of false positives among adults with psychosis (30%). Findings serve as a reminder that social communication difficulties measured by the ADOS-2 are not specific to ASD, particularly in clinically complex settings. PMID:28589494

  20. The Screening Accuracy of the Parent and Teacher-Reported Social Responsiveness Scale (SRS): Comparison with the 3Di and ADOS

    ERIC Educational Resources Information Center

    Duvekot, Jorieke; van der Ende, Jan; Verhulst, Frank C.; Greaves-Lord, Kirstin

    2015-01-01

    The screening accuracy of the parent and teacher-reported Social Responsiveness Scale (SRS) was compared with an autism spectrum disorder (ASD) classification according to (1) the Developmental, Dimensional, and Diagnostic Interview (3Di), (2) the Autism Diagnostic Observation Schedule (ADOS), (3) both the 3Di and ADOS, in 186 children referred to…

  1. Standardizing ADOS Domain Scores: Separating Severity of Social Affect and Restricted and Repetitive Behaviors

    ERIC Educational Resources Information Center

    Hus, Vanessa; Gotham, Katherine; Lord, Catherine

    2014-01-01

    Standardized Autism Diagnostic Observation Schedule (ADOS) scores provide a measure of autism severity that is less influenced by child characteristics than raw totals (Gotham et al. in "Journal of Autism and Developmental Disorders," 39(5), 693-705 2009). However, these scores combine symptoms from the Social Affect (SA) and Restricted…

  2. Scheduling Results for the THEMIS Observation Scheduling Tool

    NASA Technical Reports Server (NTRS)

    Mclaren, David; Rabideau, Gregg; Chien, Steve; Knight, Russell; Anwar, Sadaat; Mehall, Greg; Christensen, Philip

    2011-01-01

    We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

  3. The Screening Accuracy of the Parent and Teacher-Reported Social Responsiveness Scale (SRS): Comparison with the 3Di and ADOS.

    PubMed

    Duvekot, Jorieke; van der Ende, Jan; Verhulst, Frank C; Greaves-Lord, Kirstin

    2015-06-01

    The screening accuracy of the parent and teacher-reported Social Responsiveness Scale (SRS) was compared with an autism spectrum disorder (ASD) classification according to (1) the Developmental, Dimensional, and Diagnostic Interview (3 Di), (2) the Autism Diagnostic Observation Schedule (ADOS), (3) both the 3 Di and ADOS, in 186 children referred to six mental health centers. The parent report showed excellent correspondence to an ASD classification according to the 3 Di and both the 3 Di and ADOS. The teacher report added significantly to the screening accuracy over and above the parent report when compared with the ADOS classification. Findings support the screening utility of the parent-reported SRS among clinically referred children and indicate that different informants may provide unique information relevant for ASD assessment.

  4. Social and Communication Abilities and Disabilities in Higher Functioning Individuals with Autism Spectrum Disorders: The Vineland and the ADOS

    ERIC Educational Resources Information Center

    Klin, Ami; Saulnier, Celine A.; Sparrow, Sara S.; Cicchetti, Domenic V.; Volkmar, Fred R.; Lord, Catherine

    2007-01-01

    The relationship between adaptive functioning ("ability") and autism symptomatology ("disability") remains unclear, especially for higher functioning individuals with autism spectrum disorder (ASD). This study investigates "ability" and "disability" using the "Vineland" and "Autism Diagnostic Observation Schedule" (ADOS), respectively, in two…

  5. Observation Scheduling System

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel Q.; Rabideau, Gregg R.; Schaffer, Steven R.

    2011-01-01

    Software has been designed to schedule remote sensing with the Earth Observing One spacecraft. The software attempts to satisfy as many observation requests as possible considering each against spacecraft operation constraints such as data volume, thermal, pointing maneuvers, and others. More complex constraints such as temperature are approximated to enable efficient reasoning while keeping the spacecraft within safe limits. Other constraints are checked using an external software library. For example, an attitude control library is used to determine the feasibility of maneuvering between pairs of observations. This innovation can deal with a wide range of spacecraft constraints and solve large scale scheduling problems like hundreds of observations and thousands of combinations of observation sequences.

  6. The Discriminative Ability and Diagnostic Utility of the ADOS-G, ADI-R, and GARS for Children in a Clinical Setting

    ERIC Educational Resources Information Center

    Mazefsky, Carla A.; Oswald, Donald P.

    2006-01-01

    Recent years have seen a surge of interest in assessment instruments for diagnosing autism in children. Instruments have generally been developed and evaluated from a research perspective. The Autism Diagnostic Observation Schedule-Generic (ADOS-G), Autism Diagnostic Interview-Revised (ADI-R), and Gilliam Autism Rating Scale (GARS) have received…

  7. The Autism Diagnostic Observation Schedule, Module 4: Revised Algorithm and Standardized Severity Scores

    PubMed Central

    Hus, Vanessa; Lord, Catherine

    2014-01-01

    The Autism Diagnostic Observation Schedule, 2nd Edition includes revised diagnostic algorithms and standardized severity scores for modules used to assess children and adolescents of varying language abilities. Comparable revisions have not yet been applied to the Module 4, used with verbally fluent adults. The current study revises the Module 4 algorithm and calibrates raw overall and domain totals to provide metrics of ASD symptom severity. Sensitivity and specificity of the revised Module 4 algorithm exceeded 80% in the overall sample. Module 4 calibrated severity scores provide quantitative estimates of ASD symptom severity that are relatively independent of participant characteristics. These efforts increase comparability of ADOS scores across modules and should facilitate efforts to increase understanding of adults with ASD. PMID:24590409

  8. Examining the relationship between social communication on the ADOS and real-world reciprocal social communication in children with ASD

    PubMed Central

    Qualls, Lydia R.; Corbett, Blythe A.

    2016-01-01

    Background While many children with autism spectrum disorders (ASDs) communicate better with adults than peers, diagnostic measures are given by adult examiners. These measures may not accurately capture the deficits that children with ASD have in communicating with their peers. Method This study examined the ability of the Autism Diagnostic Observation Schedule (ADOS) Social Communication scale to predict reciprocal communication in children with ASD during natural play with peers using the Peer Interaction Paradigm (PIP). Thirty participants with ASD were given the ADOS and then participated in the PIP, after which their behavior was analyzed. Results Using linear regression, we found that Social Communication was the primary significant predictor for reciprocal communication during play, and that reciprocal communication was not predicted by Verbal IQ or the Restrictive and Repetitive Behaviors scale on the ADOS. Conclusions The findings suggest that the ADOS measures naturally-occurring social communication patterns with peers and can be used to inform treatment options for children with ASD based on an accurate measure of their level of impairment in social communication. PMID:28947912

  9. Validity of the Children's Social Behavior Questionnaire (CSBQ) in Children with Intellectual Disability: Comparing the CSBQ with ADI-R, ADOS, and Clinical DSM-IV-TR Classification

    ERIC Educational Resources Information Center

    de Bildt, Annelies; Mulder, Erik J.; Hoekstra, Pieter J.; van Lang, Natasja D. J.; Minderaa, Ruud B.; Hartman, Catharina A.

    2009-01-01

    The Children's Social Behavior Questionnaire (CSBQ) was compared with the Autism Diagnostic Interview-Revised (ADI-R), Autism Diagnostic Observation Schedule (ADOS), and clinical classification in children with mild and moderate intellectual disability (ID), to investigate its criterion related validity. The contribution of the CSBQ to a…

  10. Automated observation scheduling for the VLT

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

  11. Cost-efficient scheduling of FAST observations

    NASA Astrophysics Data System (ADS)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  12. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  13. A Comparison of Techniques for Scheduling Earth-Observing Satellites

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2004-01-01

    Scheduling observations by coordinated fleets of Earth Observing Satellites (EOS) involves large search spaces, complex constraints and poorly understood bottlenecks, conditions where evolutionary and related algorithms are often effective. However, there are many such algorithms and the best one to use is not clear. Here we compare multiple variants of the genetic algorithm: stochastic hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on ten realistically-sized EOS scheduling problems. Schedules are represented by a permutation (non-temperal ordering) of the observation requests. A simple deterministic scheduler assigns times and resources to each observation request in the order indicated by the permutation, discarding those that violate the constraints created by previously scheduled observations. Simulated annealing performs best. Random mutation outperform a more 'intelligent' mutator. Furthermore, the best mutator, by a small margin, was a novel approach we call temperature dependent random sampling that makes large changes in the early stages of evolution and smaller changes towards the end of search.

  14. Observing with HST V: Improvements to the Scheduling of HST Parallel Observations

    NASA Astrophysics Data System (ADS)

    Taylor, D. K.; Vanorsow, D.; Lucks, M.; Henry, R.; Ratnatunga, K.; Patterson, A.

    1994-12-01

    Recent improvements to the Hubble Space Telescope (HST) ground system have significantly increased the frequency of pure parallel observations, i.e. the simultaneous use of multiple HST instruments by different observers. Opportunities for parallel observations are limited by a variety of timing, hardware, and scientific constraints. Formerly, such opportunities were heuristically predicted prior to the construction of the primary schedule (or calendar), and lack of complete information resulted in high rates of scheduling failures and missed opportunities. In the current process the search for parallel opportunities is delayed until the primary schedule is complete, at which point new software tools are employed to identify places where parallel observations are supported. The result has been a considerable increase in parallel throughput. A new technique, known as ``parallel crafting,'' is currently under development to streamline further the parallel scheduling process. This radically new method will replace the standard exposure logsheet with a set of abstract rules from which observation parameters will be constructed ``on the fly'' to best match the constraints of the parallel opportunity. Currently, parallel observers must specify a huge (and highly redundant) set of exposure types in order to cover all possible types of parallel opportunities. Crafting rules permit the observer to express timing, filter, and splitting preferences in a far more succinct manner. The issue of coordinated parallel observations (same PI using different instruments simultaneously), long a troublesome aspect of the ground system, is also being addressed. For Cycle 5, the Phase II Proposal Instructions now have an exposure-level PAR WITH special requirement. While only the primary's alignment will be scheduled on the calendar, new commanding will provide for parallel exposures with both instruments.

  15. A scheduling algorithm for Spacelab telescope observations

    NASA Technical Reports Server (NTRS)

    Grone, B.

    1982-01-01

    An algorithm is developed for sequencing and scheduling of observations of stellar targets by equipment on Spacelab. The method is a general one. The scheduling problem is defined and examined. The method developed for its solution is documented. Suggestions for further development and implementation of this method are made.

  16. Planning and Scheduling for Fleets of Earth Observing Satellites

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Jonsson, Ari; Morris, Robert; Smith, David E.; Norvig, Peter (Technical Monitor)

    2001-01-01

    We address the problem of scheduling observations for a collection of earth observing satellites. This scheduling task is a difficult optimization problem, potentially involving many satellites, hundreds of requests, constraints on when and how to service each request, and resources such as instruments, recording devices, transmitters, and ground stations. High-fidelity models are required to ensure the validity of schedules; at the same time, the size and complexity of the problem makes it unlikely that systematic optimization search methods will be able to solve them in a reasonable time. This paper presents a constraint-based approach to solving the Earth Observing Satellites (EOS) scheduling problem, and proposes a stochastic heuristic search method for solving it.

  17. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  18. Expert systems tools for Hubble Space Telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark

    1987-01-01

    The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

  19. Conservation and functional importance of carbon-oxygen hydrogen bonding in AdoMet-dependent methyltransferases.

    PubMed

    Horowitz, Scott; Dirk, Lynnette M A; Yesselman, Joseph D; Nimtz, Jennifer S; Adhikari, Upendra; Mehl, Ryan A; Scheiner, Steve; Houtz, Robert L; Al-Hashimi, Hashim M; Trievel, Raymond C

    2013-10-16

    S-adenosylmethionine (AdoMet)-based methylation is integral to metabolism and signaling. AdoMet-dependent methyltransferases belong to multiple distinct classes and share a catalytic mechanism that arose through convergent evolution; however, fundamental determinants underlying this shared methyl transfer mechanism remain undefined. A survey of high-resolution crystal structures reveals that unconventional carbon-oxygen (CH···O) hydrogen bonds coordinate the AdoMet methyl group in different methyltransferases irrespective of their class, active site structure, or cofactor binding conformation. Corroborating these observations, quantum chemistry calculations demonstrate that these charged interactions formed by the AdoMet sulfonium cation are stronger than typical CH···O hydrogen bonds. Biochemical and structural studies using a model lysine methyltransferase and an active site mutant that abolishes CH···O hydrogen bonding to AdoMet illustrate that these interactions are important for high-affinity AdoMet binding and transition-state stabilization. Further, crystallographic and NMR dynamics experiments of the wild-type enzyme demonstrate that the CH···O hydrogen bonds constrain the motion of the AdoMet methyl group, potentially facilitating its alignment during catalysis. Collectively, the experimental findings with the model methyltransferase and structural survey imply that methyl CH···O hydrogen bonding represents a convergent evolutionary feature of AdoMet-dependent methyltransferases, mediating a universal mechanism for methyl transfer.

  20. Ado-trastuzumab Emtansine

    MedlinePlus

    ... and has not improved or has worsened after treatment with other medications. Ado-trastuzumab emtansine is in ... once every 3 weeks. The length of your treatment depends on how well your body responds to ...

  1. Scheduling Earth Observing Satellites with Evolutionary Algorithms

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2003-01-01

    We hypothesize that evolutionary algorithms can effectively schedule coordinated fleets of Earth observing satellites. The constraints are complex and the bottlenecks are not well understood, a condition where evolutionary algorithms are often effective. This is, in part, because evolutionary algorithms require only that one can represent solutions, modify solutions, and evaluate solution fitness. To test the hypothesis we have developed a representative set of problems, produced optimization software (in Java) to solve them, and run experiments comparing techniques. This paper presents initial results of a comparison of several evolutionary and other optimization techniques; namely the genetic algorithm, simulated annealing, squeaky wheel optimization, and stochastic hill climbing. We also compare separate satellite vs. integrated scheduling of a two satellite constellation. While the results are not definitive, tests to date suggest that simulated annealing is the best search technique and integrated scheduling is superior.

  2. Does the Brief Observation of Social Communication Change Help Moving Forward in Measuring Change in Early Autism Intervention Studies?

    ERIC Educational Resources Information Center

    Pijl, Mirjam K. J.; Rommelse, Nanda N. J.; Hendriks, Monica; De Korte, Manon W. P.; Buitelaar, Jan K.; Oosterling, Iris J.

    2018-01-01

    The field of early autism research is in dire need of outcome measures that adequately reflect subtle changes in core autistic behaviors. This article compares the ability of a newly developed measure, the Brief Observation of Social Communication Change (BOSCC), and the Autism Diagnostic Observation Schedule (ADOS) to detect changes in core…

  3. Tracing the temporal stability of autism spectrum diagnosis and severity as measured by the Autism Diagnostic Observation Schedule: A systematic review and meta-analysis.

    PubMed

    Bieleninik, Łucja; Posserud, Maj-Britt; Geretsegger, Monika; Thompson, Grace; Elefant, Cochavit; Gold, Christian

    2017-01-01

    Exploring ways to improve the trajectory and symptoms of autism spectrum disorder is prevalent in research, but less is known about the natural prognosis of autism spectrum disorder and course of symptoms. The objective of this study was to examine the temporal stability of autism spectrum disorder and autism diagnosis, and the longitudinal trajectories of autism core symptom severity. We furthermore sought to identify possible predictors for change. We searched PubMed, PsycInfo, EMBASE, Web of Science, Cochrane Library up to October 2015 for prospective cohort studies addressing the autism spectrum disorder/autism diagnostic stability, and prospective studies of intervention effects. We included people of all ages with autism spectrum disorder/autism or at risk of having autism spectrum disorder, who were diagnosed and followed up for at least 12 months using the Autism Diagnostic Observation Schedule (ADOS). Both continuous ADOS scores and dichotomous diagnostic categories were pooled in random-effects meta-analysis and meta-regression. Of 1443 abstracts screened, 44 were eligible of which 40 studies contained appropriate data for meta-analysis. A total of 5771 participants from 7 months of age to 16.5 years were included. Our analyses showed no change in ADOS scores across time as measured by Calibrated Severity Scores (mean difference [MD] = 0.05, 95% CI -0.26 to 0.36). We observed a minor but statistically significant change in ADOS total raw scores (MD = -1.51, 95% CI -2.70 to -0.32). There was no improvement in restricted and repetitive behaviours (standardised MD [SMD] = -0.04, 95% CI -0.19 to 0.11), but a minor improvement in social affect over time (SMD = -0.31, 95% CI -0.50 to -0.12). No changes were observed for meeting the autism spectrum disorder criteria over time (risk difference [RD] = -0.01, 95% CI -0.03 to 0.01), but a significant change for meeting autism criteria over time (RD = -0.18, 95% CI -0.29 to -0.07). On average, there was a high

  4. Tracing the temporal stability of autism spectrum diagnosis and severity as measured by the Autism Diagnostic Observation Schedule: A systematic review and meta-analysis

    PubMed Central

    Geretsegger, Monika; Thompson, Grace; Elefant, Cochavit

    2017-01-01

    Background Exploring ways to improve the trajectory and symptoms of autism spectrum disorder is prevalent in research, but less is known about the natural prognosis of autism spectrum disorder and course of symptoms. The objective of this study was to examine the temporal stability of autism spectrum disorder and autism diagnosis, and the longitudinal trajectories of autism core symptom severity. We furthermore sought to identify possible predictors for change. Methods We searched PubMed, PsycInfo, EMBASE, Web of Science, Cochrane Library up to October 2015 for prospective cohort studies addressing the autism spectrum disorder/autism diagnostic stability, and prospective studies of intervention effects. We included people of all ages with autism spectrum disorder/autism or at risk of having autism spectrum disorder, who were diagnosed and followed up for at least 12 months using the Autism Diagnostic Observation Schedule (ADOS). Both continuous ADOS scores and dichotomous diagnostic categories were pooled in random-effects meta-analysis and meta-regression. Results Of 1443 abstracts screened, 44 were eligible of which 40 studies contained appropriate data for meta-analysis. A total of 5771 participants from 7 months of age to 16.5 years were included. Our analyses showed no change in ADOS scores across time as measured by Calibrated Severity Scores (mean difference [MD] = 0.05, 95% CI -0.26 to 0.36). We observed a minor but statistically significant change in ADOS total raw scores (MD = -1.51, 95% CI -2.70 to -0.32). There was no improvement in restricted and repetitive behaviours (standardised MD [SMD] = -0.04, 95% CI -0.19 to 0.11), but a minor improvement in social affect over time (SMD = -0.31, 95% CI -0.50 to -0.12). No changes were observed for meeting the autism spectrum disorder criteria over time (risk difference [RD] = -0.01, 95% CI -0.03 to 0.01), but a significant change for meeting autism criteria over time (RD = -0.18, 95% CI -0.29 to -0.07). On

  5. The Role of Scheduling in Observing Teacher-Child Interactions

    ERIC Educational Resources Information Center

    Cash, Anne H.; Pianta, Robert C.

    2014-01-01

    Observational assessment is being used on a large scale to evaluate the quality of interactions between teachers and children in classroom environments. When one performs observations at scale, features of the protocol such as the scheduling of observations can potentially influence observed scores. In this study interactions were observed for 88…

  6. Scheduling Earth Observing Fleets Using Evolutionary Algorithms: Problem Description and Approach

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Morris, Robert; Clancy, Daniel (Technical Monitor)

    2002-01-01

    We describe work in progress concerning multi-instrument, multi-satellite scheduling. Most, although not all, Earth observing instruments currently in orbit are unique. In the relatively near future, however, we expect to see fleets of Earth observing spacecraft, many carrying nearly identical instruments. This presents a substantially new scheduling challenge. Inspired by successful commercial applications of evolutionary algorithms in scheduling domains, this paper presents work in progress regarding the use of evolutionary algorithms to solve a set of Earth observing related model problems. Both the model problems and the software are described. Since the larger problems will require substantial computation and evolutionary algorithms are embarrassingly parallel, we discuss our parallelization techniques using dedicated and cycle-scavenged workstations.

  7. A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2003-01-01

    Earth observing satellite (EOS) scheduling is a complex real-world domain representative of a broad class of over-subscription scheduling problems. Over-subscription problems are those where requests for a facility exceed its capacity. These problems arise in a wide variety of NASA and terrestrial domains and are .XI important class of scheduling problems because such facilities often represent large capital investments. We have run experiments comparing multiple variants of the genetic algorithm, hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on two variants of a realistically-sized model of the EOS scheduling problem. These are implemented as permutation-based methods; methods that search in the space of priority orderings of observation requests and evaluate each permutation by using it to drive a greedy scheduler. Simulated annealing performs best and random mutation operators outperform our squeaky (more intelligent) operator. Furthermore, taking smaller steps towards the end of the search improves performance.

  8. SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy

    2005-01-01

    The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can

  9. Scheduling Observations of Celestial Objects for Earth Observing Sensor Calibration

    NASA Technical Reports Server (NTRS)

    Wilson, Truman; Xiong, Xiaoxiong

    2016-01-01

    Radiometric calibration of Earth-observing satellite sensors is critical for tracking on-orbit gain changes through- out the satellite's mission. The Moon, being a stable, well-characterized radiometric target, has been used effectively for tracking the relative gain changes of the reflective solar bands for the Moderate Resolution Imaging Spectroradiometer (MODIS) on board EOS AM-1 (Terra) and PM-1 (Aqua). The Moon is viewed through the MODIS space-view port, and the relative phase of the Moon is restricted to within 0.5 degrees of a chosen target phase to increase the accuracy of the calibration. These geometric restrictions require spacecraft maneuvers in order to bring space-view port into proper alignment with the position of the Moon when the phase requirement is met. In this paper, we describe a versatile tool for scheduling such maneuvers based on the required geometry and lunar phase restrictions for a general spacecraft bound instrument. The results of the scheduling tool have been verified using lunar images from Aqua and Terra MODIS after a scheduled roll maneuver was performed. This tool has also been tested for the Visible Infrared Imaging Radiometer Suite (VIIRS) and the Advanced Technology Microwave Sounder on-board the Suomi-NPP spacecraft. As an extension of this work, we have also developed a tool for scheduling views of bright stars. These stars provide another well-characterized radiometric source that can be used for sensor calibration. This tool has been implemented to determine the times in which a chosen star can be viewed by the high gain stages of the day/night band for the VIIRS instrument.

  10. Artificial intelligence approaches to astronomical observation scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  11. ADO: a disease ontology representing the domain knowledge specific to Alzheimer's disease.

    PubMed

    Malhotra, Ashutosh; Younesi, Erfan; Gündel, Michaela; Müller, Bernd; Heneka, Michael T; Hofmann-Apitius, Martin

    2014-03-01

    Biomedical ontologies offer the capability to structure and represent domain-specific knowledge semantically. Disease-specific ontologies can facilitate knowledge exchange across multiple disciplines, and ontology-driven mining approaches can generate great value for modeling disease mechanisms. However, in the case of neurodegenerative diseases such as Alzheimer's disease, there is a lack of formal representation of the relevant knowledge domain. Alzheimer's disease ontology (ADO) is constructed in accordance to the ontology building life cycle. The Protégé OWL editor was used as a tool for building ADO in Ontology Web Language format. ADO was developed with the purpose of containing information relevant to four main biological views-preclinical, clinical, etiological, and molecular/cellular mechanisms-and was enriched by adding synonyms and references. Validation of the lexicalized ontology by means of named entity recognition-based methods showed a satisfactory performance (F score = 72%). In addition to structural and functional evaluation, a clinical expert in the field performed a manual evaluation and curation of ADO. Through integration of ADO into an information retrieval environment, we show that the ontology supports semantic search in scientific text. The usefulness of ADO is authenticated by dedicated use case scenarios. Development of ADO as an open ADO is a first attempt to organize information related to Alzheimer's disease in a formalized, structured manner. We demonstrate that ADO is able to capture both established and scattered knowledge existing in scientific text. Copyright © 2014 The Alzheimer's Association. Published by Elsevier Inc. All rights reserved.

  12. A dynamic scheduling method of Earth-observing satellites by employing rolling horizon strategy.

    PubMed

    Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma

    2013-01-01

    Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments.

  13. A Dynamic Scheduling Method of Earth-Observing Satellites by Employing Rolling Horizon Strategy

    PubMed Central

    Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma

    2013-01-01

    Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments. PMID:23690742

  14. Parent-reported and clinician-observed autism spectrum disorder (ASD) symptoms in children with attention deficit/hyperactivity disorder (ADHD): implications for practice under DSM-5.

    PubMed

    Grzadzinski, Rebecca; Dick, Catherine; Lord, Catherine; Bishop, Somer

    2016-01-01

    Children with attention deficit/hyperactivity disorder (ADHD) often present with social difficulties, though the extent to which these clearly overlap with symptoms of autism spectrum disorder (ASD) is not well understood. We explored parent-reported and directly-observed ASD symptoms on the Autism Diagnostic Interview-Revised (ADI-R) and the Autism Diagnostic Observation Schedule (ADOS) in children referred to ASD-specialty clinics who received diagnoses of either ADHD (n = 48) or ASD (n = 164). Of the ADHD sample, 21 % met ASD cut-offs on the ADOS and 30 % met ASD cut-offs on all domains of the ADI-R. Four social communication ADOS items (Quality of Social Overtures, Unusual Eye Contact, Facial Expressions Directed to Examiner, and Amount of Reciprocal Social Communication) adequately differentiated the groups while none of the items on the ADI-R met the criteria for adequate discrimination. Results of this work highlight the challenges that clinicians and researchers face when distinguishing ASD from other disorders in verbally fluent, school-age children.

  15. A hybrid online scheduling mechanism with revision and progressive techniques for autonomous Earth observation satellite

    NASA Astrophysics Data System (ADS)

    Li, Guoliang; Xing, Lining; Chen, Yingwu

    2017-11-01

    The autonomicity of self-scheduling on Earth observation satellite and the increasing scale of satellite network attract much attention from researchers in the last decades. In reality, the limited onboard computational resource presents challenge for the online scheduling algorithm. This study considered online scheduling problem for a single autonomous Earth observation satellite within satellite network environment. It especially addressed that the urgent tasks arrive stochastically during the scheduling horizon. We described the problem and proposed a hybrid online scheduling mechanism with revision and progressive techniques to solve this problem. The mechanism includes two decision policies, a when-to-schedule policy combining periodic scheduling and critical cumulative number-based event-driven rescheduling, and a how-to-schedule policy combining progressive and revision approaches to accommodate two categories of task: normal tasks and urgent tasks. Thus, we developed two heuristic (re)scheduling algorithms and compared them with other generally used techniques. Computational experiments indicated that the into-scheduling percentage of urgent tasks in the proposed mechanism is much higher than that in periodic scheduling mechanism, and the specific performance is highly dependent on some mechanism-relevant and task-relevant factors. For the online scheduling, the modified weighted shortest imaging time first and dynamic profit system benefit heuristics outperformed the others on total profit and the percentage of successfully scheduled urgent tasks.

  16. Observatorio Astrofísico de Javalambre: observation scheduler and sequencer

    NASA Astrophysics Data System (ADS)

    Ederoclite, A.; Cristóbal-Hornillos, D.; Moles, M.; Cenarro, A. J.; Marín-Franch, A.; Yanes Díaz, A.; Gruel, N.; Varela, J.; Chueca, S.; Rueda-Teruel, F.; Rueda-Teruel, S.; Luis-Simoes, R.; Hernández-Fuertes, J.; López-Sainz, A.; Chioare Díaz-Martín, M.

    2013-05-01

    Observational strategy is a critical path in any large survey. The planning of a night requires the knowledge of the fields observed, the quality of the data already secured, and the ones still to be observed to optimize scientific returns. Finally, field maximum altitude, sky distance/brightness during the night and meteorological data (cloud coverage and seeing) have to be taken into account in order to increase the chance to have a successful observation. To support the execution of the J-PAS project at the Javalambre Astrophysical Observatory, we have prepared a scheduler and a sequencer (SCH/SQ) which takes into account all the relevant mentioned parameters. The scheduler first selects the fields which can be observed during the night and orders them on the basis of their figure of merit. It takes into account the quality and spectral coverage of the existing observations as well as the possibility to get a good observation during the night. The sequencer takes into account the meteorological variables in order to prepare the observation queue for the night. During the commissioning of the telescopes at OAJ, we expect to improve our figures of merit and eventually get to a system which can function semi-automatically. This poster describes the design of this software.

  17. African Doppler Surveys (ADOS).

    DTIC Science & Technology

    1983-06-01

    UP TO 31 MARCH 1983 MAILING DATE: 11 APRIL 1983 SURVEY STATUS DATA STATUSDOPPLER STATION L1 OR1ATION - ______(hte 1,(Whether data dis- GEOD . TIES...SURVEY STATUS DTA STATUS DOPPLER STATION INFORMATION (Whet~her data dia- GEOD . TIES patched to...data dis- GEOD . TIES patched to COUNThY STATION NAME APPROXIMAT OPPLER designated CODE AND ADOS NO. SZION ()outh Comp. Center) COORDINATES fin- Yes

  18. Observing the Use of Tactile Schedules

    ERIC Educational Resources Information Center

    Aasen, Gro; Naerland, Terje

    2014-01-01

    This article explores the use of tactile schedules in a heterogeneous sample of children with congenital blindness and varying degrees of additional disabilities. Basic conditions for the use of tactile schedules are proposed and discussed. Child behaviour indicative of some particular functions that can be attained with the use of tactile…

  19. Applying Squeaky-Wheel Optimization Schedule Airborne Astronomy Observations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Kuerklue, Elif

    2004-01-01

    We apply the Squeaky Wheel Optimization (SWO) algorithm to the problem of scheduling astronomy observations for the Stratospheric Observatory for Infrared Astronomy, an airborne observatory. The problem contains complex constraints relating the feasibility of an astronomical observation to the position and time at which the observation begins, telescope elevation limits, special use airspace, and available fuel. Solving the problem requires making discrete choices (e.g. selection and sequencing of observations) and continuous ones (e.g. takeoff time and setting up observations by repositioning the aircraft). The problem also includes optimization criteria such as maximizing observing time while simultaneously minimizing total flight time. Previous approaches to the problem fail to scale when accounting for all constraints. We describe how to customize SWO to solve this problem, and show that it finds better flight plans, often with less computation time, than previous approaches.

  20. Standardized ADOS Scores: Measuring Severity of Autism Spectrum Disorders in a Dutch Sample

    ERIC Educational Resources Information Center

    de Bildt, Annelies; Oosterling, Iris J.; van Lang, Natasja D. J.; Sytema, Sjoerd; Minderaa, Ruud B.; van Engeland, Herman; Roos, Sascha; Buitelaar, Jan K.; van der Gaag, Rutger-Jan; de Jonge, Maretha V.

    2011-01-01

    The validity of the calibrated severity scores on the ADOS as reported by Gotham et al. (J Autism Dev Disord 39: 693-705, "2009"), was investigated in an independent sample of 1248 Dutch children with 1455 ADOS administrations (modules 1, 2 and 3). The greater comparability between ADOS administrations at different times, ages and in…

  1. Cognitive and adaptive correlates of an ADOS-derived joint attention composite

    PubMed Central

    Harrison, Ashley Johnson; Lu, Zhenqiu (Laura); McLean, Rebecca L.; Sheinkopf, Stephen J.

    2016-01-01

    Joint attention skills have been shown to predict language outcomes in children with autism spectrum disorder (ASD). Less is known about the relationship between joint attention (JA) abilities in children with ASD and cognitive and adaptive abilities. In the current study, a subset of items from the Autism Diagnostic Observation Schedule (ADOS), designed to quantify JA abilities, were used to investigate social attention among an unusually large cross-sectional sample of children with ASD (n = 1061). An examination of the association between JA and a range of functional correlates (cognitive and adaptive) revealed JA was significantly related to verbal (VIQ) and non-verbal (NVIQ) cognitive ability as well as all domains of adaptive functioning (socialization, communication, and daily living skills). Additional analyses examined the degree to which the relation between adaptive abilities (socialization, communication, and daily living skills) and JA was maintained after taking into account the potentially mediating role of verbal and nonverbal cognitive ability. Results revealed that VIQ fully mediated the relation between JA and adaptive functioning, whereas the relation between these adaptive variables and JA was only partially mediated by NVIQ. Moderation analyses were also conducted to examine how verbal and non-verbal cognitive ability and gender impacted the relation between JA and adaptive functioning. In line with research showing a relation between language and JA, this indicates that while JA is significantly related to functional outcomes, this appears to be mediated specifically through a verbal cognitive pathway. PMID:28168003

  2. Does the Brief Observation of Social Communication Change help moving forward in measuring change in early autism intervention studies?

    PubMed

    Pijl, Mirjam Kj; Rommelse, Nanda Nj; Hendriks, Monica; De Korte, Manon Wp; Buitelaar, Jan K; Oosterling, Iris J

    2018-02-01

    The field of early autism research is in dire need of outcome measures that adequately reflect subtle changes in core autistic behaviors. This article compares the ability of a newly developed measure, the Brief Observation of Social Communication Change (BOSCC), and the Autism Diagnostic Observation Schedule (ADOS) to detect changes in core symptoms of autism in 44 toddlers. The results provide encouraging evidence for the Brief Observation of Social Communication Change as a candidate outcome measure, as reflected in sufficient inter- and intra-rater reliability, independency from other child characteristics, and sensitivity to capture change. Although the Brief Observation of Social Communication Change did not evidently outperform the Autism Diagnostic Observation Schedule on any of these quality criteria, the instrument may be better able to capture subtle, individual changes in core autistic symptoms. The promising findings warrant further study of this new instrument.

  3. Dynamic scheduling and planning parallel observations on large Radio Telescope Arrays with the Square Kilometre Array in mind

    NASA Astrophysics Data System (ADS)

    Buchner, Johannes

    2011-12-01

    Scheduling, the task of producing a time table for resources and tasks, is well-known to be a difficult problem the more resources are involved (a NP-hard problem). This is about to become an issue in Radio astronomy as observatories consisting of hundreds to thousands of telescopes are planned and operated. The Square Kilometre Array (SKA), which Australia and New Zealand bid to host, is aiming for scales where current approaches -- in construction, operation but also scheduling -- are insufficent. Although manual scheduling is common today, the problem is becoming complicated by the demand for (1) independent sub-arrays doing simultaneous observations, which requires the scheduler to plan parallel observations and (2) dynamic re-scheduling on changed conditions. Both of these requirements apply to the SKA, especially in the construction phase. We review the scheduling approaches taken in the astronomy literature, as well as investigate techniques from human schedulers and today's observatories. The scheduling problem is specified in general for scientific observations and in particular on radio telescope arrays. Also taken into account is the fact that the observatory may be oversubscribed, requiring the scheduling problem to be integrated with a planning process. We solve this long-term scheduling problem using a time-based encoding that works in the very general case of observation scheduling. This research then compares algorithms from various approaches, including fast heuristics from CPU scheduling, Linear Integer Programming and Genetic algorithms, Branch-and-Bound enumeration schemes. Measures include not only goodness of the solution, but also scalability and re-scheduling capabilities. In conclusion, we have identified a fast and good scheduling approach that allows (re-)scheduling difficult and changing problems by combining heuristics with a Genetic algorithm using block-wise mutation operations. We are able to explain and eradicate two problems in the

  4. The GBT Dynamic Scheduling System: A New Scheduling Paradigm

    NASA Astrophysics Data System (ADS)

    O'Neil, K.; Balser, D.; Bignell, C.; Clark, M.; Condon, J.; McCarty, M.; Marganian, P.; Shelton, A.; Braatz, J.; Harnett, J.; Maddalena, R.; Mello, M.; Sessoms, E.

    2009-09-01

    The Robert C. Byrd Green Bank Telescope (GBT) is implementing a new Dynamic Scheduling System (DSS) designed to maximize the observing efficiency of the telescope while ensuring that none of the flexibility and ease of use of the GBT is harmed and that the data quality of observations is not adversely affected. To accomplish this, the GBT DSS is implementing a dynamic scheduling system which schedules observers, rather than running scripts. The DSS works by breaking each project into one or more sessions which have associated observing criteria such as RA, Dec, and frequency. Potential observers may also enter dates when members of their team will not be available for either on-site or remote observing. The scheduling algorithm uses those data, along with the predicted weather, to determine the most efficient schedule for the GBT. The DSS provides all observers at least 24 hours notice of their upcoming observing. In the uncommon (< 20%) case where the actual weather does not match the predictions, a backup project, chosen from the database, is run instead. Here we give an overview of the GBT DSS project, including the ranking and scheduling algorithms for the sessions, the scheduling probabilities generation, the web framework for the system, and an overview of the results from the beta testing which were held from June - September, 2008.

  5. Generation of the first Autosomal Dominant Osteopetrosis Type II (ADO2) disease models

    PubMed Central

    Alam, Imranul; Gray, Amie K.; Chu, Kang; Ichikawa, Shoji; Mohammad, Khalid S.; Capannolo, Marta; Capulli, Mattia; Maurizi, Antonio; Muraca, Maurizio; Teti, Anna; Econs, Michael J.; Fattore, Andrea Del

    2013-01-01

    Autosomal Dominant Osteopetrosis Type II (ADO2) is a heritable osteosclerotic disorder dependent on osteoclast impairment. In most patients it results from heterozygous missense mutations in the chloride channel 7 (CLCN7) gene, encoding for a 2Cl−/1H+ antiporter. By a knock-in strategy inserting a missense mutation in the Clcn7 gene, our two research groups independently generated mouse models of ADO2 on different genetic backgrounds carrying the homolog of the most frequent heterozygous mutation (p.G213R) in the Clcn7 gene found in humans. Our results demonstrate that the heterozygous model holds true presenting with higher bone mass, increased numbers of poorly resorbing osteoclasts and a lethal phenotype in the homozygous state. Considerable variability is observed in the heterozygous mice according with the mouse background, suggesting that modifier genes could influence the penetrance of the disease gene. PMID:24185277

  6. Operational VGOS Scheduling

    NASA Astrophysics Data System (ADS)

    Searle, Anthony; Petrachenko, Bill

    2016-12-01

    The VLBI Global Observing System (VGOS) has been designed to take advantage of advances in data recording speeds and storage capacity, allowing for smaller and faster antennas, wider bandwidths, and shorter observation durations. Here, schedules for a ``realistic" VGOS network, frequency sequences, and expanded source lists are presented using a new source-based scheduling algorithm. The VGOS aim for continuous observations presents new operational challenges. As the source-based strategy is independent of the observing network, there are operational advantages which allow for more flexible scheduling of continuous VLBI observations. Using VieVS, simulations of several schedules are presented and compared with previous VGOS studies.

  7. Translation and Cultural Appropriateness of the Autism Diagnostic Observation Schedule-2 in Afrikaans

    ERIC Educational Resources Information Center

    Smith, Lesia; Malcolm-Smith, Susan; de Vries, Petrus J.

    2017-01-01

    Autism Diagnostic Observation Schedule-2 is the "gold standard" autism spectrum disorder observational assessment, and it is increasingly used in South Africa. However, its use is limited to English speakers, as it has not been translated into the country's other 10 official languages. Moreover, the cultural appropriateness of this tool…

  8. A knowledge-based expert system for scheduling of airborne astronomical observations

    NASA Technical Reports Server (NTRS)

    Nachtsheim, P. R.; Gevarter, W. B.; Stutz, J. C.; Banda, C. P.

    1985-01-01

    The Kuiper Airborne Observatory Scheduler (KAOS) is a knowledge-based expert system developed at NASA Ames Research Center to assist in route planning of a C-141 flying astronomical observatory. This program determines a sequence of flight legs that enables sequential observations of a set of heavenly bodies derived from a list of desirable objects. The possible flight legs are constrained by problems of observability, avoiding flyovers of warning and restricted military zones, and running out of fuel. A significant contribution of the KAOS program is that it couples computational capability with a reasoning system.

  9. The Structure of Autism Symptoms as Measured by the Autism Diagnostic Observation Schedule

    ERIC Educational Resources Information Center

    Norris, Megan; Lecavalier, Luc; Edwards, Michael C.

    2012-01-01

    The current study tested several competing models of the autism phenotype using data from modules 1 and 3 of the ADOS. Participants included individuals with ASDs aged 3-18 years (N = 1,409) from the AGRE database. Confirmatory factor analyses were performed on total samples and subsamples based on age and level of functioning. Three primary…

  10. Thermodynamics of "exotic" Bañados-Teitelboim-Zanelli black holes.

    PubMed

    Townsend, Paul K; Zhang, Baocheng

    2013-06-14

    A number of three-dimensional (3D) gravity models, such as 3D conformal gravity, admit "exotic" black hole solutions: the metric is the same as the Bañados-Teitelboim-Zanelli metric of 3D Einstein gravity but with reversed roles for mass and angular momentum, and an entropy proportional to the length of the inner horizon instead of the event horizon. Here we show that the Bañados-Teitelboim-Zanelli solutions of the exotic 3D Einstein gravity (with parity-odd action but Einstein field equations) are exotic black holes, and we investigate their thermodynamics. The first and second laws of black hole thermodynamics still apply, and the entropy still has a statistical interpretation.

  11. Multi-Satellite Observation Scheduling for Large Area Disaster Emergency Response

    NASA Astrophysics Data System (ADS)

    Niu, X. N.; Tang, H.; Wu, L. X.

    2018-04-01

    an optimal imaging plan, plays a key role in coordinating multiple satellites to monitor the disaster area. In the paper, to generate imaging plan dynamically according to the disaster relief, we propose a dynamic satellite task scheduling method for large area disaster response. First, an initial robust scheduling scheme is generated by a robust satellite scheduling model in which both the profit and the robustness of the schedule are simultaneously maximized. Then, we use a multi-objective optimization model to obtain a series of decomposing schemes. Based on the initial imaging plan, we propose a mixed optimizing algorithm named HA_NSGA-II to allocate the decomposing results thus to obtain an adjusted imaging schedule. A real disaster scenario, i.e., 2008 Wenchuan earthquake, is revisited in terms of rapid response using satellite resources and used to evaluate the performance of the proposed method with state-of-the-art approaches. We conclude that our satellite scheduling model can optimize the usage of satellite resources so as to obtain images in disaster response in a more timely and efficient manner.

  12. Structural, Thermodynamic, and Functional Mechanisms of Adaptations WrbA and AdoMetDC Proteins in Extremophilic Organisms

    DTIC Science & Technology

    2007-08-15

    thermophilic ) and low (psychrophilic). A model protein used in this study, S- adenosyl-methionine decarboxylase (AdoMetDC), is a key enzyme in the polyamine...experimental characterization of the thermophilic AdoMtDC from Termatoga maritima. The processing of TmAdoMetDC that leads to catalytically active enzyme is... thermophilic organisms. One of the open questions of structural biology is the understanding of the mechanisms by which enzymes adapt to extreme temperatures

  13. An investigation of the 'female camouflage effect' in autism using a computerized ADOS-2 and a test of sex/gender differences.

    PubMed

    Rynkiewicz, Agnieszka; Schuller, Björn; Marchi, Erik; Piana, Stefano; Camurri, Antonio; Lassalle, Amandine; Baron-Cohen, Simon

    2016-01-01

    Autism spectrum conditions (autism) are diagnosed more frequently in boys than in girls. Females with autism may have been under-identified due to not only a male-biased understanding of autism but also females' camouflaging. The study describes a new technique that allows automated coding of non-verbal mode of communication (gestures) and offers the possibility of objective, evaluation of gestures, independent of human judgment. The EyesWeb software platform and the Kinect sensor during two demonstration activities of ADOS-2 (Autism Diagnostic Observation Schedule, Second Edition) were used. The study group consisted of 33 high-functioning Polish girls and boys with formal diagnosis of autism or Asperger syndrome aged 5-10, with fluent speech, IQ average and above and their parents (girls with autism, n = 16; boys with autism, n = 17). All children were assessed during two demonstration activities of Module 3 of ADOS-2, administered in Polish, and coded using Polish codes. Children were also assessed with Polish versions of the Eyes and Faces Tests. Parents provided information on the author-reviewed Polish research translation of SCQ (Social Communication Questionnaire, Current and Lifetime) and Polish version of AQ Child (Autism Spectrum Quotient, Child). Girls with autism tended to use gestures more vividly as compared to boys with autism during two demonstration activities of ADOS-2. Girls with autism made significantly more mistakes than boys with autism on the Faces Test. All children with autism had high scores in AQ Child, which confirmed the presence of autistic traits in this group. The current communication skills of boys with autism reported by parents in SCQ were significantly better than those of girls with autism. However, both girls with autism and boys with autism improved in the social and communication abilities over the lifetime. The number of stereotypic behaviours in boys significantly decreased over life whereas it remained at a

  14. Using the Autism Diagnostic Interview-Revised and the Autism Diagnostic Observation Schedule with Young Children with Developmental Delay: Evaluating Diagnostic Validity

    ERIC Educational Resources Information Center

    Gray, Kylie M.; Tonge, Bruce J.; Sweeney, Deborah J.

    2008-01-01

    Few studies have focused on the validity of the ADI-R and ADOS in the assessment of preschool children with developmental delay. This study aimed to evaluate the diagnostic validity of the ADI-R and the ADOS in young children. Two-hundred and nine children aged 20-55 months participated in the study, 120 of whom received a diagnosis of autism.…

  15. Brief Report: Autism in Individuals with Down Syndrome

    ERIC Educational Resources Information Center

    Starr, Elizabeth M.; Berument, Sibel Kazak; Tomlins, Megan; Papanikolaou, Katerina; Rutter, Michael

    2005-01-01

    As an off-shoot of a study examining the reliability and validity of an adapted version of the Pre-Linguistic Autism Diagnostic Observation Schedule (A-PL-ADOS), 13 individuals with Down syndrome with IQs ranging between 24 and 48 were administered the Autism Diagnostic Interview-Revised (ADI-R) and the A-PL-ADOS, which are well-validated…

  16. Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

    NASA Technical Reports Server (NTRS)

    Davis, Randal; Thalman, Nancy

    1993-01-01

    The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

  17. Planning and Scheduling of Payloads of AstroSat During Initial and Normal Phase Observations

    NASA Astrophysics Data System (ADS)

    Pandiyan, R.; Subbarao, S. V.; Nagamani, T.; Rao, Chaitra; Rao, N. Hari Prasad; Joglekar, Harish; Kumar, Naresh; Dumpa, Surya Ratna Prakash; Chauhan, Anshu; Dakshayani, B. P.

    2017-06-01

    On 28th September 2015, India launched its first astronomical space observatory AstroSat, successfully. AstroSat carried five astronomy payloads, namely, (i) Cadmium Zinc Telluride Imager (CZTI), (ii) Large Area X-ray Proportional Counter (LAXPC), (iii) Soft X-ray Telescope (SXT), (iv) Ultra Violet Imaging Telescope (UVIT) and (v) Scanning Sky Monitor (SSM) and therefore, has the capability to observe celestial objects in multi-wavelength. Four of the payloads are co-aligned along the positive roll axis of the spacecraft and the remaining one is placed along the positive yaw axis direction. All the payloads are sensitive to bright objects and specifically, require avoiding bright Sun within a safe zone of their bore axes in orbit. Further, there are other operational constraints both from spacecraft side and payloads side which are to be strictly enforced during operations. Even on-orbit spacecraft manoeuvres are constrained to about two of the axes in order to avoid bright Sun within this safe zone and a special constrained manoeuvre is exercised during manoeuvres. The planning and scheduling of the payloads during the Performance Verification (PV) phase was carried out in semi-autonomous/manual mode and a complete automation is exercised for normal phase/Guaranteed Time Observation (GuTO) operations. The process is found to be labour intensive and several operational software tools, encompassing spacecraft sub-systems, on-orbit, domain and environmental constraints, were built-in and interacted with the scheduling tool for appropriate decision-making and science scheduling. The procedural details of the complex scheduling of a multi-wavelength astronomy space observatory and their working in PV phase and in normal/GuTO phases are presented in this paper.

  18. Transcatheter closure of patent ductus arteriosus using the AMPLATZER™ duct occluder II (ADO II).

    PubMed

    Gruenstein, Daniel H; Ebeid, Makram; Radtke, Wolfgang; Moore, Phillip; Holzer, Ralf; Justino, Henri

    2017-05-01

    The study purpose is to evaluate the safety and efficacy of the ADO II device for closure of patent ductus arteriosus (PDA) in children. Transcatheter treatment of PDA has been evolving for 40+ years and is the treatment of choice. The AMPLATZER™ Duct Occluder (ADO) device was developed for larger diameter ducts and is not ideal in all PDAs. ADO II was developed for small to moderate-sized ducts. This is a single-arm, multicenter study evaluating safety and efficacy of the ADO II device. Patients <18 years were screened for a PDA ≤5.5 mm in diameter and 3-12 mm in length. Right and left heart catheterization was performed, and hemodynamic data were obtained at the time of implant. The diameter of the left pulmonary artery (LPA) and descending aorta, and the presence of any pre-existing pressure gradients across the LPA or aortic arch were assessed at baseline and 6 months post-implant. A total of 192 patients were enrolled. The median implant time was 74 min. Median fluoroscopy time was 12 min. A retrograde (aortic) approach was used in 33% of procedures and demonstrated a statistically significant reduction in fluoroscopy time (P value = 0.0018) compared to an antegrade approach. The device was successfully implanted in 93% of patients, with complete closure in 98% of successful implantations. In this prospective study, the ADO II was safe and effective for closure of small to moderate PDAs. Implantation is simple and the ability for retrograde aortic delivery reduces procedure-related radiation exposure. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  19. Diagnosing ASD in Adults without ID: Accuracy of the ADOS-2 and the ADI-R

    ERIC Educational Resources Information Center

    Fusar-Poli, Laura; Brondino, Natascia; Rocchetti, Matteo; Panisi, Cristina; Provenzani, Umberto; Damiani, Stefano; Politi, Pierluigi

    2017-01-01

    Diagnosing autism spectrum disorder (ASD) in adulthood often represents a challenge in clinical practice. The aim of the present study was to evaluate the sensitivity and specificity of the ADOS and ADI-R in diagnosing ASD in adults. 113 subjects with an IQ of 70 or above were assessed through an extensive clinical evaluation. The ADOS-2 Module 4…

  20. Dispatch Scheduling of Automated Telescopes

    NASA Astrophysics Data System (ADS)

    Denny, R. B.

    2004-05-01

    Automated telescope scheduling systems have traditionally focused on optimiz- ing the use of the observatory, minimizing overhead and maximizing shutter- open time. However, educational and amateur observatories do not enjoy con- sistently good skies. Conditions can change significantly during an observing session, leading to schedule breakage. This gives rise to the need for a scheduling system that is capable of recovering from periods of bad skies, wind, etc. without operator intervention. The concept of dispatch scheduling, where the scheduler makes a "best" choice for the next observation, will be discussed. The choice of next target must consider constraints such as mini- mum altitude or maximum air mass, moon illumination, and sky condition, as well as timing constraints that may arise from linked observations and/or target phasing requirements. It also must be as fair and efficient as prac- tical. A dispatch scheduler (ACPS) was constructed and used to perform a num- ber of simulations with both isolated and multiple/linked observations, and noisy timing. By varying "best next target" choice algorithm, these simula- tions provided insight into the behavior of a dispatch scheduler. This talk will describe the scheduler and present the results of these preliminary sim- ulations, some conclusions that arose from them, and outline areas for fur- ther research.

  1. Starshade Observation Scheduling for WFIRST

    NASA Astrophysics Data System (ADS)

    Soto, Gabriel; Garrett, Daniel; Delacroix, Christian; Savransky, Dmitry

    2018-01-01

    An exoplanet direct imaging mission can employ an external starshade for starlight suppression to achieve higher contrasts and potentially higher throughput than with an internal coronagraph. This separately-launched starshade spacecraft is assumed to maintain a single, constant separation distance from the space telescope—for this study, the Wide Field Infrared Survey Telescope (WFIRST)—based on a designated inner working angle during integration times. The science yield of such a mission can be quantified using the Exoplanet Open-Source Imaging Simulator (EXOSIMS): this simulator determines the distributions of mission outcomes, such as the types and amount of exoplanet detections, based on ensembles of end-to-end simulations of the mission. This study adds a starshade class to the survey simulation module of EXOSIMS and outlines a method for efficiently determining observation schedules. The new starshade class solves boundary value problems using circular restricted three-body dynamics to find fast, high-accuracy estimates of the starshade motion while repositioning between WFIRST observations. Fuel usage dictates the mission lifetime of the starshade given its limited fuel supply and is dominated by the Δv used to reposition the starshade between the LOS of different targets; the repositioning time-of-flight is kept constant in this study. A starshade burns less fuel to reach certain target stars based on their relative projected positions on a skymap; other targets with costly transfers can be filtered out to increase the starshade mission duration. Because the initial target list can consist of nearly 2000 stars, calculating the Δv required to move the starshade to every other star on the target list would be too computationally expensive and renders running ensembles of survey simulations infeasible. Assuming the starshade begins its transfer at the LOS of a certain star, a Δv curve is approximated for the remaining target stars based on their right

  2. An Enhanced Method for Scheduling Observations of Large Sky Error Regions for Finding Optical Counterparts to Transients

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rana, Javed; Singhal, Akshat; Gadre, Bhooshan

    2017-04-01

    The discovery and subsequent study of optical counterparts to transient sources is crucial for their complete astrophysical understanding. Various gamma-ray burst (GRB) detectors, and more notably the ground-based gravitational wave detectors, typically have large uncertainties in the sky positions of detected sources. Searching these large sky regions spanning hundreds of square degrees is a formidable challenge for most ground-based optical telescopes, which can usually image less than tens of square degrees of the sky in a single night. We present algorithms for better scheduling of such follow-up observations in order to maximize the probability of imaging the optical counterpart, basedmore » on the all-sky probability distribution of the source position. We incorporate realistic observing constraints such as the diurnal cycle, telescope pointing limitations, available observing time, and the rising/setting of the target at the observatory’s location. We use simulations to demonstrate that our proposed algorithms outperform the default greedy observing schedule used by many observatories. Our algorithms are applicable for follow-up of other transient sources with large positional uncertainties, such as Fermi -detected GRBs, and can easily be adapted for scheduling radio or space-based X-ray follow-up.« less

  3. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  4. ASD Symptom Severity in Adolescence of Individuals Diagnosed with PDD-NOS in Childhood: Stability and the Relation with Psychiatric Comorbidity and Societal Participation

    ERIC Educational Resources Information Center

    Louwerse, A.; Eussen, M. L. J. M.; Van der Ende, J.; de Nijs, P. F. A.; Van Gool, A. R.; Dekker, L. P.; Verheij, C.; Verheij, F.; Verhulst, F. C.; Greaves-Lord, K.

    2015-01-01

    The current 7-year follow-up study investigated: (1) the stability of ASD severity, and (2) associations of ASD severity in adolescence with (a) childhood and concurrent psychiatric comorbidity, and (b) concurrent societal functioning. The Autism Diagnostic Observation Schedule (ADOS) and the Diagnostic Interview Schedule for Children were…

  5. Do we need a femoral artery route for transvenous PDA closure in children with ADO-I?

    PubMed

    Baykan, Ali; Narin, Nazmi; Özyurt, Abdullah; Argun, Mustafa; Pamukçu, Özge; Onan, Sertaç H; Sezer, Sadettin; Baykan, Zeynep; Üzüm, Kazım

    2015-03-01

    The standard procedure in percutaneous closure of patent ductus arteriosus (PDA) with Amplatzer duct occluder-I (ADO-I) is transvenous closure guided by aortic access through femoral artery. The current study aims to compare the procedures for PDA closure with ADO-I: only transvenous access with the standard procedure. This study was designed retrospectively and 101 pediatric patients were included. PDA closure was done by only femoral venous access in 19 of them (group 1), arterial and venous access used in 92 patients (group 2) between 2004 to 2012 years. The position of the device and residual shunt in group1 was evaluated by the guidance of the aortogram obtained during the return phase of the pulmonary artery injection and guidance of transthoracic echocardiography. Shapiro-Wilk's test, Mann-Whitney U, chi-squared tests were used for statistical comparison. The procedure was successful in 18 (95%) patients in group 1 and 90 (98%) patients in group 2. Complications including the pulmonary artery embolization (n=1), protrusion to pulmonary artery (n=1), inguinal hematoma (n=3), bleeding (n=2) were only detected in group 2. In other words, while complications were observed in 7 (7.2%) patients in group 2, no minor/major complication was observed in group 1. Complete closure in group 1 was: in catheterization room 14 (77.8%), at 24th hour in 2 (11.1%), at first month in 2 (11.1%). Complete closure in group 2 was: 66 (73.4%) patients in the catheterization room, 21 (23.3%) at 24th hour, 3 (3.3%) at first month, complete closure occurred at the end of first month. In percutaneouse PDA closure via ADO-I, this technique can be a choice for patients whose femoral artery could not be accessed, or access is impossible/contraindicated. But for the reliability and validity of this method, randomized multicenter clinical studies are necessary.

  6. Do we need a femoral artery route for transvenous PDA closure in children with ADO-I?

    PubMed Central

    Baykan, Ali; Narin, Nazmi; Özyurt, Abdullah; Argun, Mustafa; Pamukçu, Özge; Onan, Sertaç H.; Sezer, Sadettin; Baykan, Zeynep; Üzüm, Kazım

    2015-01-01

    Objective: The standard procedure in percutaneous closure of patent ductus arteriosus (PDA) with Amplatzer duct occluder-I (ADO-I) is transvenous closure guided by aortic access through femoral artery. The current study aims to compare the procedures for PDA closure with ADO-I: only transvenous access with the standard procedure. Methods: This study was designed retrospectively and 101 pediatric patients were included. PDA closure was done by only femoral venous access in 19 of them (group 1), arterial and venous access used in 92 patients (group 2) between 2004 to 2012 years. The position of the device and residual shunt in group1 was evaluated by the guidance of the aortogram obtained during the return phase of the pulmonary artery injection and guidance of transthoracic echocardiography. Shapiro-Wilk’s test, Mann-Whitney U, chi-squared tests were used for statistical comparison. Results: The procedure was successful in 18 (95%) patients in group 1 and 90 (98%) patients in group 2. Complications including the pulmonary artery embolization (n=1), protrusion to pulmonary artery (n=1), inguinal hematoma (n=3), bleeding (n=2) were only detected in group 2. In other words, while complications were observed in 7 (7.2%) patients in group 2, no minor/major complication was observed in group 1. Complete closure in group 1 was: in catheterization room 14 (77.8%), at 24th hour in 2 (11.1%), at first month in 2 (11.1%). Complete closure in group 2 was: 66 (73.4%) patients in the catheterization room, 21 (23.3%) at 24th hour, 3 (3.3%) at first month, complete closure occurred at the end of first month. Conclusion: In percutaneouse PDA closure via ADO-I, this technique can be a choice for patients whose femoral artery could not be accessed, or access is impossible/contraindicated. But for the reliability and validity of this method, randomized multicenter clinical studies are necessary. PMID:25333978

  7. The Classroom Observation Schedule to Measure Intentional Communication (COSMIC): an observational measure of the intentional communication of children with autism in an unstructured classroom setting.

    PubMed

    Pasco, Greg; Gordon, Rosanna K; Howlin, Patricia; Charman, Tony

    2008-11-01

    The Classroom Observation Schedule to Measure Intentional Communication (COSMIC) was devised to provide ecologically valid outcome measures for a communication-focused intervention trial. Ninety-one children with autism spectrum disorder aged 6 years 10 months (SD 16 months) were videoed during their everyday snack, teaching and free play activities. Inter-rater reliability was high and relevant items showed significant associations with comparable items from concurrent Autism Diagnostic Observation Schedule-Generic (Lord et al. 2000, J Autism Dev Disord 30(3):205-223) assessments. In a subsample of 28 children initial differences in rates of initiations, initiated speech/vocalisation and commenting were predictive of language and communication competence 15 months later. Results suggest that the use of observational measures of intentional communication in natural settings is a valuable assessment strategy for research and clinical practice.

  8. Integration of frequency modulated constant envelope technique with ADO-OFDM to impede PAPR in VLC

    NASA Astrophysics Data System (ADS)

    Singh, Vinay Kumar; Dalal, U. D.

    2018-07-01

    A novel technique of combating the effects of high peak to average power ratio (PAPR) arising due to the non-linearity of the LED in a typical optical-OFDM (O-OFDM) for visible light communication (VLC) systems used in optical wireless channel (OWC) is proposed in this research work. The concept of constant envelope (CE) using frequency modulation (FM) for a composite O-OFDM system formed by uniting Asymmetrically Clipped Optical OFDM (ACO-OFDM) and Direct Current biased Optical OFDM (DCO-OFDM) termed as ADO-OFDM is mathematically presented with its numerical simulation results. The proposed system FM-CE-ADO-OFDM shows improvement in the PAPR with narrowing down to the least possible 0 dB theoretically. The analysis is extended to be compared with the phase modulation (PM) technique of CE-OFDM. The magnitude of phase discontinuity in the two systems is evaluated in the form of metrics yielding favorable results for the proposed system. This system is as spectrally efficient as the DCO-OFDM and as power efficient as the ACO-OFDM with the added advantage of major reduction in the effects due to PAPR arising as a result of the nonlinearity of the LED . The so formed FM-CE-ADO-OFDM is fed to the LED biased in the linear most region of its operation for simulation purpose. We also evaluate the depth of modulation required to obtain least bit error rate (BER). The frequency modulation at 30% depth has been observed to give suitable performance. The entire system is evaluated for an OWC length of 2m resembling the indoor illumination scenario. The receiver sensitivity shows an improvement of 1.2 dB at the FEC threshold for the proposed system.

  9. External validation of ADO, DOSE, COTE and CODEX at predicting death in primary care patients with COPD using standard and machine learning approaches.

    PubMed

    Morales, Daniel R; Flynn, Rob; Zhang, Jianguo; Trucco, Emmanuel; Quint, Jennifer K; Zutis, Kris

    2018-05-01

    Several models for predicting the risk of death in people with chronic obstructive pulmonary disease (COPD) exist but have not undergone large scale validation in primary care. The objective of this study was to externally validate these models using statistical and machine learning approaches. We used a primary care COPD cohort identified using data from the UK Clinical Practice Research Datalink. Age-standardised mortality rates were calculated for the population by gender and discrimination of ADO (age, dyspnoea, airflow obstruction), COTE (COPD-specific comorbidity test), DOSE (dyspnoea, airflow obstruction, smoking, exacerbations) and CODEX (comorbidity, dyspnoea, airflow obstruction, exacerbations) at predicting death over 1-3 years measured using logistic regression and a support vector machine learning (SVM) method of analysis. The age-standardised mortality rate was 32.8 (95%CI 32.5-33.1) and 25.2 (95%CI 25.4-25.7) per 1000 person years for men and women respectively. Complete data were available for 54879 patients to predict 1-year mortality. ADO performed the best (c-statistic of 0.730) compared with DOSE (c-statistic 0.645), COTE (c-statistic 0.655) and CODEX (c-statistic 0.649) at predicting 1-year mortality. Discrimination of ADO and DOSE improved at predicting 1-year mortality when combined with COTE comorbidities (c-statistic 0.780 ADO + COTE; c-statistic 0.727 DOSE + COTE). Discrimination did not change significantly over 1-3 years. Comparable results were observed using SVM. In primary care, ADO appears superior at predicting death in COPD. Performance of ADO and DOSE improved when combined with COTE comorbidities suggesting better models may be generated with additional data facilitated using novel approaches. Copyright © 2018. Published by Elsevier Ltd.

  10. Multi-component assessment of chronic obstructive pulmonary disease: an evaluation of the ADO and DOSE indices and the global obstructive lung disease categories in international primary care data sets

    PubMed Central

    Jones, Rupert C; Price, David; Chavannes, Niels H; Lee, Amanda J; Hyland, Michael E; Ställberg, Björn; Lisspers, Karin; Sundh, Josefin; van der Molen, Thys; Tsiligianni, Ioanna

    2016-01-01

    Suitable tools for assessing the severity of chronic obstructive pulmonary disease (COPD) include multi-component indices and the global initiative for chronic obstructive lung disease (GOLD) categories. The aim of this study was to evaluate the dyspnoea, obstruction, smoking, exacerbation (DOSE) and the age, dyspnoea, obstruction (ADO) indices and GOLD categories as measures of current health status and future outcomes in COPD patients. This was an observational cohort study comprising 5,114 primary care COPD patients across three databases from UK, Sweden and Holland. The associations of DOSE and ADO indices with (i) health status using the Clinical COPD Questionnaire (CCQ) and St George’s Respiratory Questionnaire (SGRQ) and COPD Assessment test (CAT) and with (ii) current and future exacerbations, admissions and mortality were assessed in GOLD categories and DOSE and ADO indices. DOSE and ADO indices were significant predictors of future exacerbations: incident rate ratio was 1.52 (95% confidence intervals 1.46–1.57) for DOSE, 1.16 (1.12–1.20) for ADO index and 1.50 (1.33–1.68) and 1.23 (1.10–1.39), respectively, for hospitalisations. Negative binomial regression showed that the DOSE index was a better predictor of future admissions than were its component items. The hazard ratios for mortality were generally higher for ADO index groups than for DOSE index groups. The GOLD categories produced widely differing assessments for future exacerbation risk or for hospitalisation depending on the methods used to calculate them. None of the assessment systems were excellent at predicting future risk in COPD; the DOSE index appears better than the ADO index for predicting many outcomes, but not mortality. The GOLD categories predict future risk inconsistently. The DOSE index and the GOLD categories using exacerbation frequency may be used to identify those at high risk for exacerbations and admissions. PMID:27053297

  11. Multi-component assessment of chronic obstructive pulmonary disease: an evaluation of the ADO and DOSE indices and the global obstructive lung disease categories in international primary care data sets.

    PubMed

    Jones, Rupert C; Price, David; Chavannes, Niels H; Lee, Amanda J; Hyland, Michael E; Ställberg, Björn; Lisspers, Karin; Sundh, Josefin; van der Molen, Thys; Tsiligianni, Ioanna

    2016-04-07

    Suitable tools for assessing the severity of chronic obstructive pulmonary disease (COPD) include multi-component indices and the global initiative for chronic obstructive lung disease (GOLD) categories. The aim of this study was to evaluate the dyspnoea, obstruction, smoking, exacerbation (DOSE) and the age, dyspnoea, obstruction (ADO) indices and GOLD categories as measures of current health status and future outcomes in COPD patients. This was an observational cohort study comprising 5,114 primary care COPD patients across three databases from UK, Sweden and Holland. The associations of DOSE and ADO indices with (i) health status using the Clinical COPD Questionnaire (CCQ) and St George's Respiratory Questionnaire (SGRQ) and COPD Assessment test (CAT) and with (ii) current and future exacerbations, admissions and mortality were assessed in GOLD categories and DOSE and ADO indices. DOSE and ADO indices were significant predictors of future exacerbations: incident rate ratio was 1.52 (95% confidence intervals 1.46-1.57) for DOSE, 1.16 (1.12-1.20) for ADO index and 1.50 (1.33-1.68) and 1.23 (1.10-1.39), respectively, for hospitalisations. Negative binomial regression showed that the DOSE index was a better predictor of future admissions than were its component items. The hazard ratios for mortality were generally higher for ADO index groups than for DOSE index groups. The GOLD categories produced widely differing assessments for future exacerbation risk or for hospitalisation depending on the methods used to calculate them. None of the assessment systems were excellent at predicting future risk in COPD; the DOSE index appears better than the ADO index for predicting many outcomes, but not mortality. The GOLD categories predict future risk inconsistently. The DOSE index and the GOLD categories using exacerbation frequency may be used to identify those at high risk for exacerbations and admissions.

  12. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  13. Combinations of Response-Dependent and Response-Independent Schedule-Correlated Stimulus Presentation in an Observing Procedure

    ERIC Educational Resources Information Center

    DeFulio, Anthony; Hackenberg, Timothy D.

    2008-01-01

    Pigeons pecked a response key on a variable-interval (VI) schedule, in which responses produced food every 40 s, on average. These VI periods, or components, alternated in irregular fashion with extinction components in which food was unavailable. Pecks on a second (observing) key briefly produced exteroceptive stimuli (houselight flashes)…

  14. The Composition of the Master Schedule

    NASA Technical Reports Server (NTRS)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  15. Star Scheduling Mode—A New Observing Strategy for Monitoring Weak Southern Radio Sources with the AuScope VLBI Array

    NASA Astrophysics Data System (ADS)

    McCallum, Lucia; Mayer, David; Le Bail, Karine; Schartner, Matthias; McCallum, Jamie; Lovell, Jim; Titov, Oleg; Shu, Fengchun; Gulyaev, Sergei

    2017-11-01

    The International Celestial Reference Frame suffers from significantly less observations in the southern hemisphere compared to the northern one. One reason for this is the historically low number of very long baseline interferometry radio telescopes in the south. The AuScope very long baseline interferometry array with three new telescopes on the Australian continent and an identical antenna in New Zealand were built to address this issue. While the overall number of observations in the south has greatly improved since then, a closer look reveals that this improvement is only true for strong radio sources (source flux densities >0.6 Jy). The new array of small very long baseline interferometry antennas has a relatively low baseline sensitivity so that only strong sources can be observed within a short integration time. A new observing strategy, the star scheduling mode, was developed to enable efficient observations of weak sources during geodetic sessions, through the addition of a single more sensitive antenna to the network. This scheduling mode was implemented in the Vienna very long baseline interferometry Software and applied in four 24-h sessions in 2016. These observations provide updated positions and source flux densities for 42 weak southern radio sources and significantly reduce the formal uncertainties for these sources. The star scheduling mode now allows the AuScope very long baseline interferometry array to undertake greater responsibility in monitoring sources in the southern sky, without significantly weakening the session for geodetic purposes.

  16. The Modified-Classroom Observation Schedule to Measure Intentional Communication (M-COSMIC): Evaluation of Reliability and Validity

    ERIC Educational Resources Information Center

    Clifford, Sally; Hudry, Kristelle; Brown, Laura; Pasco, Greg; Charman, Tony

    2010-01-01

    The Modified-Classroom Observation Schedule to Measure Intentional Communication (M-COSMIC) was developed as an ecologically valid measure of social-communication behaviour, delineating forms, functions, and intended partners of children's spontaneous communication acts. Forty-one children with autism spectrum disorder (ASD) aged 48-73 months were…

  17. Autonomous Scheduling Requirements for Agile Cubesat Constellations in Earth Observation

    NASA Astrophysics Data System (ADS)

    Nag, S.; Li, A. S. X.; Kumar, S.

    2017-12-01

    Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, 40 kg) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging commercially, Cubesats now have the ability to slew and capture images within short notice. Prior literature has demonstrated a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying orientation of agile Cubesats in a constellation such that they maximize the number of observed images, within the constraints of hardware specs. Schedule optimization is performed on the ground autonomously, using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. Our algorithm-in-the-loop simulation applied to Landsat's use case, captured up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-hour simulation. In this paper, we will derive the requirements for the above algorithm to run onboard small satellites such that the constellation can make time-sensitive decisions to slew and capture images autonomously, without ground support. We will apply the above autonomous algorithm to a time critical use case - monitoring of precipitation and subsequent effects on floods, landslides and soil moisture, as quantified by the NASA Unified Weather Research and Forecasting Model. Since the latency between these event occurrences is quite low, they make a strong case for autonomous decisions among satellites in a constellation. The algorithm can be implemented in the Plan Execution Interchange Language - NASA's open source technology for automation, used to operate the International Space Station and LADEE's in flight software - enabling a controller

  18. Southwestern Cooperative Educational Laboratory Interaction Observation Schedule (SCIOS): A System for Analyzing Teacher-Pupil Interaction in the Affective Domain.

    ERIC Educational Resources Information Center

    Bemis, Katherine A.; Liberty, Paul G.

    The Southwestern Cooperative Interaction Observation Schedule (SCIOS) is a classroom observation instrument designed to record pupil-teacher interaction. The classification of pupil behavior is based on Krathwohl's (1964) theory of the three lowest levels of the affective domain. The levels are (1) receiving: the learner should be sensitized to…

  19. Cooperative Scheduling of Imaging Observation Tasks for High-Altitude Airships Based on Propagation Algorithm

    PubMed Central

    Chuan, He; Dishan, Qiu; Jin, Liu

    2012-01-01

    The cooperative scheduling problem on high-altitude airships for imaging observation tasks is discussed. A constraint programming model is established by analyzing the main constraints, which takes the maximum task benefit and the minimum cruising distance as two optimization objectives. The cooperative scheduling problem of high-altitude airships is converted into a main problem and a subproblem by adopting hierarchy architecture. The solution to the main problem can construct the preliminary matching between tasks and observation resource in order to reduce the search space of the original problem. Furthermore, the solution to the sub-problem can detect the key nodes that each airship needs to fly through in sequence, so as to get the cruising path. Firstly, the task set is divided by using k-core neighborhood growth cluster algorithm (K-NGCA). Then, a novel swarm intelligence algorithm named propagation algorithm (PA) is combined with the key node search algorithm (KNSA) to optimize the cruising path of each airship and determine the execution time interval of each task. Meanwhile, this paper also provides the realization approach of the above algorithm and especially makes a detailed introduction on the encoding rules, search models, and propagation mechanism of the PA. Finally, the application results and comparison analysis show the proposed models and algorithms are effective and feasible. PMID:23365522

  20. Automated Long - Term Scheduling for the SOFIA Airborne Observatory

    NASA Technical Reports Server (NTRS)

    Civeit, Thomas

    2013-01-01

    The NASA Stratospheric Observatory for Infrared Astronomy (SOFIA) is a joint US/German project to develop and operate a gyro-stabilized 2.5-meter telescope in a Boeing 747SP. SOFIA's first science observations were made in December 2010. During 2011, SOFIA accomplished 30 flights in the "Early Science" program as well as a deployment to Germany. The new observing period, known as Cycle 1, is scheduled to begin in 2012. It includes 46 science flights grouped in four multi-week observing campaigns spread through a 13-month span. Automation of the flight scheduling process offers a major challenge to the SOFIA mission operations. First because it is needed to mitigate its relatively high cost per unit observing time compared to space-borne missions. Second because automated scheduling techniques available for ground-based and space-based telescopes are inappropriate for an airborne observatory. Although serious attempts have been made in the past to solve part of the problem, until recently mission operations staff was still manually scheduling flights. We present in this paper a new automated solution for generating SOFIA long-term schedules that will be used in operations from the Cycle 1 observing period. We describe the constraints that should be satisfied to solve the SOFIA scheduling problem in the context of real operations. We establish key formulas required to efficiently calculate the aircraft course over ground when evaluating flight schedules. We describe the foundations of the SOFIA long-term scheduler, the constraint representation, and the random search based algorithm that generates observation and instrument schedules. Finally, we report on how the new long-term scheduler has been used in operations to date.

  1. Interactive Dynamic Mission Scheduling for ASCA

    NASA Astrophysics Data System (ADS)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  2. Testing Task Schedulers on Linux System

    NASA Astrophysics Data System (ADS)

    Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj

    Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).

  3. Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.

  4. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  5. Long range science scheduling for the Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Johnston, Mark

    1991-01-01

    Observations with NASA's Hubble Space Telescope (HST) are scheduled with the assistance of a long-range scheduling system (SPIKE) that was developed using artificial intelligence techniques. In earlier papers, the system architecture and the constraint representation and propagation mechanisms were described. The development of high-level automated scheduling tools, including tools based on constraint satisfaction techniques and neural networks is described. The performance of these tools in scheduling HST observations is discussed.

  6. AI techniques for a space application scheduling problem

    NASA Technical Reports Server (NTRS)

    Thalman, N.; Sparn, T.; Jaffres, L.; Gablehouse, D.; Judd, D.; Russell, C.

    1991-01-01

    Scheduling is a very complex optimization problem which can be categorized as an NP-complete problem. NP-complete problems are quite diverse, as are the algorithms used in searching for an optimal solution. In most cases, the best solutions that can be derived for these combinatorial explosive problems are near-optimal solutions. Due to the complexity of the scheduling problem, artificial intelligence (AI) can aid in solving these types of problems. Some of the factors are examined which make space application scheduling problems difficult and presents a fairly new AI-based technique called tabu search as applied to a real scheduling application. the specific problem is concerned with scheduling application. The specific problem is concerned with scheduling solar and stellar observations for the SOLar-STellar Irradiance Comparison Experiment (SOLSTICE) instrument in a constrained environment which produces minimum impact on the other instruments and maximizes target observation times. The SOLSTICE instrument will gly on-board the Upper Atmosphere Research Satellite (UARS) in 1991, and a similar instrument will fly on the earth observing system (Eos).

  7. Scheduling observational and physical practice: influence on the coding of simple motor sequences.

    PubMed

    Ellenbuerger, Thomas; Boutin, Arnaud; Blandin, Yannick; Shea, Charles H; Panzer, Stefan

    2012-01-01

    The main purpose of the present experiment was to determine the coordinate system used in the development of movement codes when observational and physical practice are scheduled across practice sessions. The task was to reproduce a 1,300-ms spatial-temporal pattern of elbow flexions and extensions. An intermanual transfer paradigm with a retention test and two effector (contralateral limb) transfer tests was used. The mirror effector transfer test required the same pattern of homologous muscle activation and sequence of limb joint angles as that performed or observed during practice, and the non-mirror effector transfer test required the same spatial pattern movements as that performed or observed. The test results following the first acquisition session replicated the findings of Gruetzmacher, Panzer, Blandin, and Shea (2011) . The results following the second acquisition session indicated a strong advantage for participants who received physical practice in both practice sessions or received observational practice followed by physical practice. This advantage was found on both the retention and the mirror transfer tests compared to the non-mirror transfer test. These results demonstrate that codes based in motor coordinates can be developed relatively quickly and effectively for a simple spatial-temporal movement sequence when participants are provided with physical practice or observation followed by physical practice, but physical practice followed by observational practice or observational practice alone limits the development of codes based in motor coordinates.

  8. The LSST OCS scheduler design

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Schumacher, German

    2014-08-01

    The Large Synoptic Survey Telescope (LSST) is a complex system of systems with demanding performance and operational requirements. The nature of its scientific goals requires a special Observatory Control System (OCS) and particularly a very specialized automatic Scheduler. The OCS Scheduler is an autonomous software component that drives the survey, selecting the detailed sequence of visits in real time, taking into account multiple science programs, the current external and internal conditions, and the history of observations. We have developed a SysML model for the OCS Scheduler that fits coherently in the OCS and LSST integrated model. We have also developed a prototype of the Scheduler that implements the scheduling algorithms in the simulation environment provided by the Operations Simulator, where the environment and the observatory are modeled with real weather data and detailed kinematics parameters. This paper expands on the Scheduler architecture and the proposed algorithms to achieve the survey goals.

  9. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  10. The application of artificial intelligence to astronomical scheduling problems

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  11. Dispatch Scheduling to Maximize Exoplanet Detection

    NASA Astrophysics Data System (ADS)

    Johnson, Samson; McCrady, Nate; MINERVA

    2016-01-01

    MINERVA is a dedicated exoplanet detection telescope array using radial velocity measurements of nearby stars to detect planets. MINERVA will be a completely robotic facility, with a goal of maximizing the number of exoplanets detected. MINERVA requires a unique application of queue scheduling due to its automated nature and the requirement of high cadence observations. A dispatch scheduling algorithm is employed to create a dynamic and flexible selector of targets to observe, in which stars are chosen by assigning values through a weighting function. I designed and have begun testing a simulation which implements the functions of a dispatch scheduler and records observations based on target selections through the same principles that will be used at the commissioned site. These results will be used in a larger simulation that incorporates weather, planet occurrence statistics, and stellar noise to test the planet detection capabilities of MINERVA. This will be used to heuristically determine an optimal observing strategy for the MINERVA project.

  12. Brief Report: Concurrent Validity of Autism Symptom Severity Measures

    ERIC Educational Resources Information Center

    Reszka, Stephanie S.; Boyd, Brian A.; McBee, Matthew; Hume, Kara A.; Odom, Samuel L.

    2014-01-01

    The autism spectrum disorder (ASD) diagnostic classifications, according to the DSM-5, include a severity rating. Several screening and/or diagnostic measures, such as the autism diagnostic and observation schedule (ADOS), Childhood Autism Rating Scale (CARS) and social responsiveness scale (SRS) (teacher and parent versions), include an…

  13. Brief Report: An Exploratory Study of the Diagnostic Reliability for Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Taylor, Lauren J.; Eapen, Valsamma; Maybery, Murray; Midford, Sue; Paynter, Jessica; Quarmby, Lyndsay; Smith, Timothy; Williams, Katrina; Whitehouse, Andrew J.

    2017-01-01

    Previous research shows inconsistency in clinician-assigned diagnoses of Autism Spectrum Disorder (ASD). We conducted an exploratory study that examined the concordance of diagnoses between a multidisciplinary assessment team and a range of independent clinicians throughout Australia. Nine video-taped Autism Diagnostic Observation Schedule (ADOS)…

  14. Obstetric and Parental Psychiatric Variables as Potential Predictors of Autism Severity

    ERIC Educational Resources Information Center

    Wallace, Anna E.; Anderson, George M.; Dubrow, Robert

    2008-01-01

    Associations between obstetric and parental psychiatric variables and subjects' Autism Diagnostic Interview-Revised (ADI-R) and Autism Diagnostic Observation Schedule (ADOS) domain scores were examined using linear mixed effects models. Data for the 228 families studied were provided by the Autism Genetic Resource Exchange. Hypertension (P =…

  15. Observational Assessment of Preschool Disruptive Behavior, Part II: validity of the Disruptive Behavior Diagnostic Observation Schedule (DB-DOS).

    PubMed

    Wakschlag, Lauren S; Briggs-Gowan, Margaret J; Hill, Carri; Danis, Barbara; Leventhal, Bennett L; Keenan, Kate; Egger, Helen L; Cicchetti, Domenic; Burns, James; Carter, Alice S

    2008-06-01

    To examine the validity of the Disruptive Behavior Diagnostic Observation Schedule (DB-DOS), a new observational method for assessing preschool disruptive behavior. A total of 327 behaviorally heterogeneous preschoolers from low-income environments comprised the validation sample. Parent and teacher reports were used to identify children with clinically significant disruptive behavior. The DB-DOS assessed observed disruptive behavior in two domains, problems in Behavioral Regulation and Anger Modulation, across three interactional contexts: Examiner Engaged, Examiner Busy, and Parent. Convergent and divergent validity of the DB-DOS were tested in relation to parent and teacher reports and independently observed behavior. Clinical validity was tested in terms of criterion and incremental validity of the DB-DOS for discriminating disruptive behavior status and impairment, concurrently and longitudinally. DB-DOS scores were significantly associated with reported and independently observed behavior in a theoretically meaningful fashion. Scores from both DB-DOS domains and each of the three DB-DOS contexts contributed uniquely to discrimination of disruptive behavior status, concurrently and predictively. Observed behavior on the DB-DOS also contributed incrementally to prediction of impairment over time, beyond variance explained by meeting DSM-IV disruptive behavior disorder symptom criteria based on parent/teacher report. The multidomain, multicontext approach of the DB-DOS is a valid method for direct assessment of preschool disruptive behavior. This approach shows promise for enhancing accurate identification of clinically significant disruptive behavior in young children and for characterizing subtypes in a manner that can directly inform etiological and intervention research.

  16. Trajectory-Based Takeoff Time Predictions Applied to Tactical Departure Scheduling: Concept Description, System Design, and Initial Observations

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn A.; Capps, Alan

    2011-01-01

    Current aircraft departure release times are based on manual estimates of aircraft takeoff times. Uncertainty in takeoff time estimates may result in missed opportunities to merge into constrained en route streams and lead to lost throughput. However, technology exists to improve takeoff time estimates by using the aircraft surface trajectory predictions that enable air traffic control tower (ATCT) decision support tools. NASA s Precision Departure Release Capability (PDRC) is designed to use automated surface trajectory-based takeoff time estimates to improve en route tactical departure scheduling. This is accomplished by integrating an ATCT decision support tool with an en route tactical departure scheduling decision support tool. The PDRC concept and prototype software have been developed, and an initial test was completed at air traffic control facilities in Dallas/Fort Worth. This paper describes the PDRC operational concept, system design, and initial observations.

  17. Chandra mission scheduling on-orbit experience

    NASA Astrophysics Data System (ADS)

    Bucher, Sabina; Williams, Brent; Pendexter, Misty; Balke, David

    2008-07-01

    Scheduling observatory time to maximize both day-to-day science target integration time and the lifetime of the observatory is a formidable challenge. Furthermore, it is not a static problem. Of course, every schedule brings a new set of observations, but the boundaries of the problem change as well. As spacecraft ages, its capabilities may degrade. As in-flight experience grows, capabilities may expand. As observing programs are completed, the needs and expectations of the science community may evolve. Changes such as these impact the rules by which a mission scheduled. In eight years on orbit, the Chandra X-Ray Observatory Mission Planning process has adapted to meet the challenge of maximizing day-to-day and mission lifetime science return, despite a consistently evolving set of scheduling constraints. The success of the planning team has been achieved, not through the use of complex algorithms and optimization routines, but through processes and home grown tools that help individuals make smart short term and long term Mission Planning decisions. This paper walks through the processes and tools used to plan and produce mission schedules for the Chandra X-Ray Observatory. Nominal planning and scheduling, target of opportunity response, and recovery from on-board autonomous safing actions are all addressed. Evolution of tools and processes, best practices, and lessons learned are highlighted along the way.

  18. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  19. Autism beyond diagnostic categories: characterization of autistic phenotypes in schizophrenia.

    PubMed

    Kästner, Anne; Begemann, Martin; Michel, Tanja Maria; Everts, Sarah; Stepniak, Beata; Bach, Christiane; Poustka, Luise; Becker, Joachim; Banaschewski, Tobias; Dose, Matthias; Ehrenreich, Hannelore

    2015-05-13

    Behavioral phenotypical continua from health to disease suggest common underlying mechanisms with quantitative rather than qualitative differences. Until recently, autism spectrum disorders and schizophrenia were considered distinct nosologic entities. However, emerging evidence contributes to the blurring of symptomatic and genetic boundaries between these conditions. The present study aimed at quantifying behavioral phenotypes shared by autism spectrum disorders and schizophrenia to prepare the ground for biological pathway analyses. Specific items of the Positive and Negative Syndrome Scale were employed and summed up to form a dimensional autism severity score (PAUSS). The score was created in a schizophrenia sample (N = 1156) and validated in adult high-functioning autism spectrum disorder (ASD) patients (N = 165). To this end, the Autism Diagnostic Observation Schedule (ADOS), the Autism (AQ) and Empathy Quotient (EQ) self-rating questionnaires were applied back to back with the newly developed PAUSS. PAUSS differentiated between ASD, schizophrenia and a disease-control sample and substantially correlated with the Autism Diagnostic Observation Schedule. Patients with ADOS scores ≥12 obtained highest, those with scores <7 lowest PAUSS values. AQ and EQ were not found to vary dependent on ADOS diagnosis. ROC curves for ADOS and PAUSS resulted in AuC values of 0.9 and 0.8, whereas AQ and EQ performed at chance level in the prediction of ASD. This work underscores the convergence of schizophrenia negative symptoms and autistic phenotypes. PAUSS evolved as a measure capturing the continuous nature of autistic behaviors. The definition of extreme-groups based on the dimensional PAUSS may permit future investigations of genetic constellations modulating autistic phenotypes.

  20. Coordinated Science Campaign Scheduling for Sensor Webs

    NASA Technical Reports Server (NTRS)

    Edgington, Will; Morris, Robert; Dungan, Jennifer; Williams, Jenny; Carlson, Jean; Fleming, Damian; Wood, Terri; Yorke-Smith, Neil

    2005-01-01

    Future Earth observing missions will study different aspects and interacting pieces of the Earth's eco-system. Scientists are designing increasingly complex, interdisciplinary campaigns to exploit the diverse capabilities of multiple Earth sensing assets. In addition, spacecraft platforms are being configured into clusters, trains, or other distributed organizations in order to improve either the quality or the coverage of observations. These simultaneous advances in the design of science campaigns and in the missions that will provide the sensing resources to support them offer new challenges in the coordination of data and operations that are not addressed by current practice. For example, the scheduling of scientific observations for satellites in low Earth orbit is currently conducted independently by each mission operations center. An absence of an information infrastructure to enable the scheduling of coordinated observations involving multiple sensors makes it difficult to execute campaigns involving multiple assets. This paper proposes a software architecture and describes a prototype system called DESOPS (Distributed Earth Science Observation Planning and Scheduling) that will address this deficiency.

  1. Evaluation of the ADOS Revised Algorithm: The Applicability in 558 Dutch Children and Adolescents

    ERIC Educational Resources Information Center

    de Bildt, Annelies; Sytema, Sjoerd; van Lang, Natasja D. J.; Minderaa, Ruud B.; van Engeland, Herman; de Jonge, Maretha V.

    2009-01-01

    The revised ADOS algorithms, proposed by Gotham et al. (J Autism Dev Disord 37:613-627, 2007), were investigated in an independent sample of 558 Dutch children (modules 1, 2 and 3). The revised algorithms lead to better balanced sensitivity and specificity for modules 2 and 3, without losing efficiency of the classification. Including the…

  2. Assessment of Pretend Play in Prader-Willi Syndrome: A Direct Comparison to Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Zyga, Olena; Russ, Sandra; Ievers-Landis, Carolyn E.; Dimitropoulos, Anastasia

    2015-01-01

    Children with Prader-Willi syndrome (PWS) are at risk for autism spectrum disorder (ASD), including pervasive social deficits. While play impairments in ASD are well documented, play abilities in PWS have not been evaluated. Fourteen children with PWS and ten children with ASD were administered the Autism Diagnostic Observation Schedule (ADOS)…

  3. Optimal radiotherapy dose schedules under parametric uncertainty

    NASA Astrophysics Data System (ADS)

    Badri, Hamidreza; Watanabe, Yoichi; Leder, Kevin

    2016-01-01

    We consider the effects of parameter uncertainty on the optimal radiation schedule in the context of the linear-quadratic model. Our interest arises from the observation that if inter-patient variability in normal and tumor tissue radiosensitivity or sparing factor of the organs-at-risk (OAR) are not accounted for during radiation scheduling, the performance of the therapy may be strongly degraded or the OAR may receive a substantially larger dose than the allowable threshold. This paper proposes a stochastic radiation scheduling concept to incorporate inter-patient variability into the scheduling optimization problem. Our method is based on a probabilistic approach, where the model parameters are given by a set of random variables. Our probabilistic formulation ensures that our constraints are satisfied with a given probability, and that our objective function achieves a desired level with a stated probability. We used a variable transformation to reduce the resulting optimization problem to two dimensions. We showed that the optimal solution lies on the boundary of the feasible region and we implemented a branch and bound algorithm to find the global optimal solution. We demonstrated how the configuration of optimal schedules in the presence of uncertainty compares to optimal schedules in the absence of uncertainty (conventional schedule). We observed that in order to protect against the possibility of the model parameters falling into a region where the conventional schedule is no longer feasible, it is required to avoid extremal solutions, i.e. a single large dose or very large total dose delivered over a long period. Finally, we performed numerical experiments in the setting of head and neck tumors including several normal tissues to reveal the effect of parameter uncertainty on optimal schedules and to evaluate the sensitivity of the solutions to the choice of key model parameters.

  4. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  5. The TJO-OAdM Robotic Observatory: the scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Casteels, Kevin; Ribas, Ignasi; Francisco, Xavier

    2010-07-01

    The Joan Oró Telescope at the Montsec Astronomical Observatory (TJO - OAdM) is a small-class observatory working under completely unattended control, due to the isolation of the site. Robotic operation is mandatory for its routine use. The level of robotization of an observatory is given by its reliability in responding to environment changes and by the required human interaction due to possible alarms. These two points establish a level of human attendance to ensure low risk at any time. But there is another key point when deciding how the system performs as a robot: the capability to adapt the scheduled observation to actual conditions. The scheduler represents a fundamental element to fully achieve an intelligent response at any time. Its main task is the mid- and short-term time optimization and it has a direct effect on the scientific return achieved by the observatory. We present a description of the scheduler developed for the TJO - OAdM, which is separated in two parts. Firstly, a pre-scheduler that makes a temporary selection of objects from the available projects according to their possibility of observation. This process is carried out before the beginning of the night following different selection criteria. Secondly, a dynamic scheduler that is executed any time a target observation is complete and a new one must be scheduled. The latter enables the selection of the best target in real time according to actual environment conditions and the set of priorities.

  6. Network Approach to Autistic Traits: Group and Subgroup Analyses of ADOS Item Scores

    ERIC Educational Resources Information Center

    Anderson, George M.; Montazeri, Farhad; de Bildt, Annelies

    2015-01-01

    A network conceptualization might contribute to understanding the occurrence and interacting nature of behavioral traits in the autism realm. Networks were constructed based on correlations of item scores of the Autism Diagnostic Observation Schedule for Modules 1, 2 and 3 obtained for a group of 477 Dutch individuals with developmental disorders.…

  7. Interleaved Observation Execution and Rescheduling on Earth Observing Systems

    NASA Technical Reports Server (NTRS)

    Khatib, Lina; Frank, Jeremy; Smith, David; Morris, Robert; Dungan, Jennifer

    2003-01-01

    Observation scheduling for Earth orbiting satellites solves the following problem: given a set of requests for images of the Earth, a set of instruments for acquiring those images distributed on a collecting of orbiting satellites, and a set of temporal and resource constraints, generate a set of assignments of instruments and viewing times to those requests that satisfy those constraints. Observation scheduling is often construed as a constrained optimization problem with the objective of maximizing the overall utility of the science data acquired. The utility of an image is typically based on the intrinsic importance of acquiring it (for example, its importance in meeting a mission or science campaign objective) as well as the expected value of the data given current viewing conditions (for example, if the image is occluded by clouds, its value is usually diminished). Currently, science observation scheduling for Earth Observing Systems is done on the ground, for periods covering a day or more. Schedules are uplinked to the satellites and are executed rigorously. An alternative to this scenario is to do some of the decision-making about what images are to be acquired on-board. The principal argument for this capability is that the desirability of making an observation can change dynamically, because of changes in meteorological conditions (e.g. cloud cover), unforeseen events such as fires, floods, or volcanic eruptions, or un-expected changes in satellite or ground station capability. Furthermore, since satellites can only communicate with the ground between 5% to 10% of the time, it may be infeasible to make the desired changes to the schedule on the ground, and uplink the revisions in time for the on-board system to execute them. Examples of scenarios that motivate an on-board capability for revising schedules include the following. First, if a desired visual scene is completely obscured by clouds, then there is little point in taking it. In this case

  8. Dosing Schedules for Pneumococcal Conjugate Vaccine

    PubMed Central

    2014-01-01

    Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses—the schedule—that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses. PMID:24336059

  9. Affirmative Action: The Scheduled Castes and the Scheduled Tribes.

    ERIC Educational Resources Information Center

    Sivaramayya, B.

    This paper considers Indian affirmative action policies that provide reservations (quotas) in favor of two disadvantaged groups, the scheduled castes and the scheduled tribes. First, definitions and background are presented. The scheduled castes ("untouchables") are said to suffer from social segregation, and the scheduled tribes from…

  10. Sleep Problems and Their Relationship to Maladaptive Behavior Severity in Psychiatrically Hospitalized Children with Autism Spectrum Disorder (ASD).

    PubMed

    Sannar, Elise M; Palka, Tamara; Beresford, Carol; Peura, Christine; Kaplan, Desmond; Verdi, Mary; Siegel, Matthew; Kaplan, Shir; Grados, Marco

    2017-10-30

    We examined the relationship between sleep duration and awakenings to Aberrant Behavior Checklist-Community (ABC-C) and Autism Diagnostic Observation Schedule (ADOS-2) scores in hospitalized youth with ASD and behavioral disturbance. Participants included 106 patients with a stay of at least 10 nights. Sleep in the hospital was recorded by staff observation. Higher scores on the ABC-C (irritability, stereotypy, and hyperactivity subscales) at admission were significantly associated with fewer minutes slept during the last five nights of hospitalization. There was no association between total awakenings and ABC-C scores or ADOS-2 comparison scores. Improved understanding of the relationship between sleep quality and maladaptive behavior in this challenging cohort of patients with ASD is vital to the definition and design of future effective interventions.

  11. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1..., Deductions, etc. (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per...

  12. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents.

    PubMed

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T

    2016-02-01

    Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012-2013 academic year. The 4 metrics of schedule quality that were compared between the 2010-2011 and 2012-2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs.

  13. Satellite scheduling considering maximum observation coverage time and minimum orbital transfer fuel cost

    NASA Astrophysics Data System (ADS)

    Zhu, Kai-Jian; Li, Jun-Feng; Baoyin, He-Xi

    2010-01-01

    In case of an emergency like the Wenchuan earthquake, it is impossible to observe a given target on earth by immediately launching new satellites. There is an urgent need for efficient satellite scheduling within a limited time period, so we must find a way to reasonably utilize the existing satellites to rapidly image the affected area during a short time period. Generally, the main consideration in orbit design is satellite coverage with the subsatellite nadir point as a standard of reference. Two factors must be taken into consideration simultaneously in orbit design, i.e., the maximum observation coverage time and the minimum orbital transfer fuel cost. The local time of visiting the given observation sites must satisfy the solar radiation requirement. When calculating the operational orbit elements as optimal parameters to be evaluated, we obtain the minimum objective function by comparing the results derived from the primer vector theory with those derived from the Hohmann transfer because the operational orbit for observing the disaster area with impulse maneuvers is considered in this paper. The primer vector theory is utilized to optimize the transfer trajectory with three impulses and the Hohmann transfer is utilized for coplanar and small inclination of non-coplanar cases. Finally, we applied this method in a simulation of the rescue mission at Wenchuan city. The results of optimizing orbit design with a hybrid PSO and DE algorithm show that the primer vector and Hohmann transfer theory proved to be effective methods for multi-object orbit optimization.

  14. New VLBI2010 scheduling strategies and implications on the terrestrial reference frames.

    PubMed

    Sun, Jing; Böhm, Johannes; Nilsson, Tobias; Krásná, Hana; Böhm, Sigrid; Schuh, Harald

    In connection with the work for the next generation VLBI2010 Global Observing System (VGOS) of the International VLBI Service for Geodesy and Astrometry, a new scheduling package (Vie_Sched) has been developed at the Vienna University of Technology as a part of the Vienna VLBI Software. In addition to the classical station-based approach it is equipped with a new scheduling strategy based on the radio sources to be observed. We introduce different configurations of source-based scheduling options and investigate the implications on present and future VLBI2010 geodetic schedules. By comparison to existing VLBI schedules of the continuous campaign CONT11, we find that the source-based approach with two sources has a performance similar to the station-based approach in terms of number of observations, sky coverage, and geodetic parameters. For an artificial 16 station VLBI2010 network, the source-based approach with four sources provides an improved distribution of source observations on the celestial sphere. Monte Carlo simulations yield slightly better repeatabilities of station coordinates with the source-based approach with two sources or four sources than the classical strategy. The new VLBI scheduling software with its alternative scheduling strategy offers a promising option with respect to applications of the VGOS.

  15. New VLBI2010 scheduling strategies and implications on the terrestrial reference frames

    NASA Astrophysics Data System (ADS)

    Sun, Jing; Böhm, Johannes; Nilsson, Tobias; Krásná, Hana; Böhm, Sigrid; Schuh, Harald

    2014-05-01

    In connection with the work for the next generation VLBI2010 Global Observing System (VGOS) of the International VLBI Service for Geodesy and Astrometry, a new scheduling package (Vie_Sched) has been developed at the Vienna University of Technology as a part of the Vienna VLBI Software. In addition to the classical station-based approach it is equipped with a new scheduling strategy based on the radio sources to be observed. We introduce different configurations of source-based scheduling options and investigate the implications on present and future VLBI2010 geodetic schedules. By comparison to existing VLBI schedules of the continuous campaign CONT11, we find that the source-based approach with two sources has a performance similar to the station-based approach in terms of number of observations, sky coverage, and geodetic parameters. For an artificial 16 station VLBI2010 network, the source-based approach with four sources provides an improved distribution of source observations on the celestial sphere. Monte Carlo simulations yield slightly better repeatabilities of station coordinates with the source-based approach with two sources or four sources than the classical strategy. The new VLBI scheduling software with its alternative scheduling strategy offers a promising option with respect to applications of the VGOS.

  16. The Capabilities of the Graphical Observation Scheduling System (GROSS) as Used by the Astro-2 Spacelab Mission

    NASA Technical Reports Server (NTRS)

    Phillips, Shaun

    1996-01-01

    The Graphical Observation Scheduling System (GROSS) and its functionality and editing capabilities are reported on. The GROSS system was developed as a replacement for a suite of existing programs and associated processes with the aim of: providing a software tool that combines the functionality of several of the existing programs, and provides a Graphical User Interface (GUI) that gives greater data visibility and editing capabilities. It is considered that the improved editing capability provided by this approach enhanced the efficiency of the second astronomical Spacelab mission's (ASTRO-2) mission planning.

  17. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R [Livermore, CA; Eckert, Philip D [Livermore, CA; Hommes, Gregg [Pleasanton, CA

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  18. Quantifying and understanding reproductive allocation schedules in plants.

    PubMed

    Wenk, Elizabeth Hedi; Falster, Daniel S

    2015-12-01

    A plant's reproductive allocation (RA) schedule describes the fraction of surplus energy allocated to reproduction as it increases in size. While theorists use RA schedules as the connection between life history and energy allocation, little is known about RA schedules in real vegetation. Here we review what is known about RA schedules for perennial plants using studies either directly quantifying RA or that collected data from which the shape of an RA schedule can be inferred. We also briefly review theoretical models describing factors by which variation in RA may arise. We identified 34 studies from which aspects of an RA schedule could be inferred. Within those, RA schedules varied considerably across species: some species abruptly shift all resources from growth to reproduction; most others gradually shift resources into reproduction, but under a variety of graded schedules. Available data indicate the maximum fraction of energy allocated to production ranges from 0.1 to 1 and that shorter lived species tend to have higher initial RA and increase their RA more quickly than do longer-lived species. Overall, our findings indicate, little data exist about RA schedules in perennial plants. Available data suggest a wide range of schedules across species. Collection of more data on RA schedules would enable a tighter integration between observation and a variety of models predicting optimal energy allocation, plant growth rates, and biogeochemical cycles.

  19. Science returns of flexible scheduling on UKIRT and the JCMT

    NASA Astrophysics Data System (ADS)

    Adamson, Andrew J.; Tilanus, Remo P.; Buckle, Jane; Davis, Gary R.; Economou, Frossie; Jenness, Tim; Delorey, K.

    2004-09-01

    The Joint Astronomy Centre operates two telescopes at the Mauna Kea Observatory: the James Clerk Maxwell Telescope, operating in the submillimetre, and the United Kingdom Infrared Telescope, operating in the near and thermal infrared. Both wavelength regimes benefit from the ability to schedule observations flexibly according to observing conditions, albeit via somewhat different "site quality" criteria. Both UKIRT and JCMT now operate completely flexible schedules. These operations are based on telescope hardware which can quickly switch between observing modes, and on a comprehensive suite of software (ORAC/OMP) which handles observing preparation by remote PIs, observation submission into the summit database, conditions-based programme selection at the summit, pipeline data reduction for all observing modes, and instant data quality feedback to the PI who may or may not be remote from the telescope. This paper describes the flexible scheduling model and presents science statistics for the first complete year of UKIRT and JCMT observing under the combined system.

  20. Observations on SOFIA Observation Scheduling: Search and Inference in the Face of Discrete and Continuous Constraints

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Gross, Michael; Kuerklu, Elif

    2003-01-01

    We did cool stuff to reduce the number of IVPs and BVPs needed to schedule SOFIA by restricting the problem. The restriction costs us little in terms of the value of the flight plans we can build. The restriction allowed us to reformulate part of the search problem as a zero-finding problem. The result is a simplified planning model and significant savings in computation time.

  1. Influences on Cocaine Tolerance Assessed under a Multiple Conjunctive Schedule of Reinforcement

    ERIC Educational Resources Information Center

    Yoon, Jin Ho; Branch, Marc N.

    2009-01-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the…

  2. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  3. Effectiveness of Haemophilus influenzae type b vaccines administered according to various schedules: systematic review and meta-analysis of observational data.

    PubMed

    Jackson, Charlotte; Mann, Andrea; Mangtani, Punam; Fine, Paul

    2013-11-01

    Conjugate vaccines against Haemophilus influenzae type b (Hib) are widely used. The full implications of Hib vaccination schedule for vaccine effectiveness (VE) are unclear. We searched the literature for observational studies reporting the effectiveness of conjugate Hib vaccines administered according to different schedules. We summarized dose-specific VE estimates, where appropriate, using random effects meta-analysis. Thirty-one eligible articles (reporting 30 studies conducted in 17 countries) were identified. Meta-analysis of case-control studies using community controls produced VE estimates against Hib meningitis of 55% (95% confidence interval: 2-80%, based on 3 studies), 96% (86-99%, 3 studies) and 96% (86-99%, 4 studies) after 1, 2 and 3 doses of vaccines other than the polyribosyl ribitol phosphate outer membrane protein vaccine. Estimates were similar using hospital controls. VE against invasive Hib disease in case-control studies was estimated as 59% (30-76%, 3 studies) and 97% (87-99%, 3 studies) for 1 and 3 doses (insufficient data were identified to estimate 2-dose VE). Point estimates from 2 studies suggested VE>90% after 1 dose of the polyribosyl ribitol phosphate outer membrane protein vaccine, but meta-analysis was not possible. Using data from 4 cohort studies, 3-dose VE was estimated as 94% (88-97%). There was some evidence that Hib vaccine was less effective when administered with acellular (rather than whole cell) pertussis vaccine. Weak evidence from 2 studies suggested that a booster confers some additional protection following full primary vaccination and may compensate for an incomplete primary series. Observational data suggest that ≥2 doses of Hib vaccine are required for high effectiveness, but do not strongly favor any particular schedule.

  4. Scheduler for monitoring objects orbiting earth using satellite-based telescopes

    DOEpatents

    Olivier, Scot S; Pertica, Alexander J; Riot, Vincent J; De Vries, Willem H; Bauman, Brian J; Nikolaev, Sergei; Henderson, John R; Phillion, Donald W

    2015-04-28

    An ephemeris refinement system includes satellites with imaging devices in earth orbit to make observations of space-based objects ("target objects") and a ground-based controller that controls the scheduling of the satellites to make the observations of the target objects and refines orbital models of the target objects. The ground-based controller determines when the target objects of interest will be near enough to a satellite for that satellite to collect an image of the target object based on an initial orbital model for the target objects. The ground-based controller directs the schedules to be uploaded to the satellites, and the satellites make observations as scheduled and download the observations to the ground-based controller. The ground-based controller then refines the initial orbital models of the target objects based on the locations of the target objects that are derived from the observations.

  5. Using All-Sky Imaging to Improve Telescope Scheduling (Abstract)

    NASA Astrophysics Data System (ADS)

    Cole, G. M.

    2017-12-01

    (Abstract only) Automated scheduling makes it possible for a small telescope to observe a large number of targets in a single night. But when used in areas which have less-than-perfect sky conditions such automation can lead to large numbers of observations of clouds and haze. This paper describes the development of a "sky-aware" telescope automation system that integrates the data flow from an SBIG AllSky340c camera with an enhanced dispatch scheduler to make optimum use of the available observing conditions for two highly instrumented backyard telescopes. Using the minute-by-minute time series image stream and a self-maintained reference database, the software maintains a file of sky brightness, transparency, stability, and forecasted visibility at several hundred grid positions. The scheduling software uses this information in real time to exclude targets obscured by clouds and select the best observing task, taking into account the requirements and limits of each instrument.

  6. 77 FR 64848 - Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... 1120S, Schedule D, Schedule K-1, and Schedule M-3 AGENCY: Internal Revenue Service (IRS), Treasury... (Loss) Reconciliation for S Corporations With Total Assets of $10 Million or More, and Schedule K-1... Corporation, Schedule D (Form 1120S), Capital Gains and Losses and Built-in Gains, Schedule K-1 (Form 1120S...

  7. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  8. The DEEP-South: Scheduling and Data Reduction Software System

    NASA Astrophysics Data System (ADS)

    Yim, Hong-Suh; Kim, Myung-Jin; Bae, Youngho; Moon, Hong-Kyu; Choi, Young-Jun; Roh, Dong-Goo; the DEEP-South Team

    2015-08-01

    The DEep Ecliptic Patrol of the Southern sky (DEEP-South), started in October 2012, is currently in test runs with the first Korea Microlensing Telescope Network (KMTNet) 1.6 m wide-field telescope located at CTIO in Chile. While the primary objective for the DEEP-South is physical characterization of small bodies in the Solar System, it is expected to discover a large number of such bodies, many of them previously unknown.An automatic observation planning and data reduction software subsystem called "The DEEP-South Scheduling and Data reduction System" (the DEEP-South SDS) is currently being designed and implemented for observation planning, data reduction and analysis of huge amount of data with minimum human interaction. The DEEP-South SDS consists of three software subsystems: the DEEP-South Scheduling System (DSS), the Local Data Reduction System (LDR), and the Main Data Reduction System (MDR). The DSS manages observation targets, makes decision on target priority and observation methods, schedules nightly observations, and archive data using the Database Management System (DBMS). The LDR is designed to detect moving objects from CCD images, while the MDR conducts photometry and reconstructs lightcurves. Based on analysis made at the LDR and the MDR, the DSS schedules follow-up observation to be conducted at other KMTNet stations. In the end of 2015, we expect the DEEP-South SDS to achieve a stable operation. We also have a plan to improve the SDS to accomplish finely tuned observation strategy and more efficient data reduction in 2016.

  9. Improved Space Surveillance Network (SSN) Scheduling using Artificial Intelligence Techniques

    NASA Astrophysics Data System (ADS)

    Stottler, D.

    There are close to 20,000 cataloged manmade objects in space, the large majority of which are not active, functioning satellites. These are tracked by phased array and mechanical radars and ground and space-based optical telescopes, collectively known as the Space Surveillance Network (SSN). A better SSN schedule of observations could, using exactly the same legacy sensor resources, improve space catalog accuracy through more complementary tracking, provide better responsiveness to real-time changes, better track small debris in low earth orbit (LEO) through efficient use of applicable sensors, efficiently track deep space (DS) frequent revisit objects, handle increased numbers of objects and new types of sensors, and take advantage of future improved communication and control to globally optimize the SSN schedule. We have developed a scheduling algorithm that takes as input the space catalog and the associated covariance matrices and produces a globally optimized schedule for each sensor site as to what objects to observe and when. This algorithm is able to schedule more observations with the same sensor resources and have those observations be more complementary, in terms of the precision with which each orbit metric is known, to produce a satellite observation schedule that, when executed, minimizes the covariances across the entire space object catalog. If used operationally, the results would be significantly increased accuracy of the space catalog with fewer lost objects with the same set of sensor resources. This approach inherently can also trade-off fewer high priority tasks against more lower-priority tasks, when there is benefit in doing so. Currently the project has completed a prototyping and feasibility study, using open source data on the SSN's sensors, that showed significant reduction in orbit metric covariances. The algorithm techniques and results will be discussed along with future directions for the research.

  10. The Autism Diagnostic Observation Schedule, Module 4: Application of the Revised Algorithms in an Independent, Well-Defined, Dutch Sample (N = 93)

    ERIC Educational Resources Information Center

    de Bildt, Annelies; Sytema, Sjoerd; Meffert, Harma; Bastiaansen, Jojanneke A. C. J.

    2016-01-01

    This study examined the discriminative ability of the revised Autism Diagnostic Observation Schedule module 4 algorithm (Hus and Lord in "J Autism Dev Disord" 44(8):1996-2012, 2014) in 93 Dutch males with Autism Spectrum Disorder (ASD), schizophrenia, psychopathy or controls. Discriminative ability of the revised algorithm ASD cut-off…

  11. Coordinating, Scheduling, Processing and Analyzing IYA09

    NASA Technical Reports Server (NTRS)

    Gipson, John; Behrend, Dirk; Gordon, David; Himwich, Ed; MacMillan, Dan; Titus, Mike; Corey, Brian

    2010-01-01

    The IVS scheduled a special astrometric VLBI session for the International Year of Astronomy 2009 (IYA09) commemorating 400 years of optical astronomy and 40 years of VLBI. The IYA09 session is the most ambitious geodetic session to date in terms of network size, number of sources, and number of observations. We describe the process of designing, coordinating, scheduling, pre-session station checkout, correlating, and analyzing this session.

  12. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  13. Interference Cognizant Network Scheduling

    NASA Technical Reports Server (NTRS)

    Hall, Brendan (Inventor); Bonk, Ted (Inventor); DeLay, Benjamin F. (Inventor); Varadarajan, Srivatsan (Inventor); Smithgall, William Todd (Inventor)

    2017-01-01

    Systems and methods for interference cognizant network scheduling are provided. In certain embodiments, a method of scheduling communications in a network comprises identifying a bin of a global timeline for scheduling an unscheduled virtual link, wherein a bin is a segment of the timeline; identifying a pre-scheduled virtual link in the bin; and determining if the pre-scheduled and unscheduled virtual links share a port. In certain embodiments, if the unscheduled and pre-scheduled virtual links don't share a port, scheduling transmission of the unscheduled virtual link to overlap with the scheduled transmission of the pre-scheduled virtual link; and if the unscheduled and pre-scheduled virtual links share a port: determining a start time delay for the unscheduled virtual link based on the port; and scheduling transmission of the unscheduled virtual link in the bin based on the start time delay to overlap part of the scheduled transmission of the pre-scheduled virtual link.

  14. Toward an Autonomous Telescope Network: the TBT Scheduler

    NASA Astrophysics Data System (ADS)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  15. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  16. Present and future hydropower scheduling in Statkraft

    NASA Astrophysics Data System (ADS)

    Bruland, O.

    2012-12-01

    Statkraft produces close to 40 TWH in an average year and is one of the largest hydropower producers in Europe. For hydropower producers the scheduling of electricity generation is the key to success and this depend on optimal use of the water resources. The hydrologist and his forecasts both on short and on long terms are crucial to this success. The hydrological forecasts in Statkraft and most hydropower companies in Scandinavia are based on lumped models and the HBV concept. But before the hydrological model there is a complex system for collecting, controlling and correcting data applied in the models and the production scheduling and, equally important, routines for surveillance of the processes and manual intervention. Prior to the forecasting the states in the hydrological models are updated based on observations. When snow is present in the catchments snow surveys are an important source for model updating. The meteorological forecast is another premise provider to the hydrological forecast and to get as precise meteorological forecast as possible Statkraft hires resources from the governmental forecasting center. Their task is to interpret the meteorological situation, describe the uncertainties and if necessary use their knowledge and experience to manually correct the forecast in the hydropower production regions. This is one of several forecast applied further in the scheduling process. Both to be able to compare and evaluate different forecast providers and to ensure that we get the best available forecast, forecasts from different sources are applied. Some of these forecasts have undergone statistical corrections to reduce biases. The uncertainties related to the meteorological forecast have for a long time been approached and described by ensemble forecasts. But also the observations used for updating the model have a related uncertainty. Both to the observations itself and to how well they represent the catchment. Though well known, these

  17. CRI planning and scheduling for space

    NASA Technical Reports Server (NTRS)

    Aarup, Mads

    1994-01-01

    Computer Resources International (CRI) has many years of experience in developing space planning and scheduling systems for the European Space Agency. Activities range from AIT/AIV planning over mission planning to research in on-board autonomy using advanced planning and scheduling technologies in conjunction with model based diagnostics. This article presents four projects carried out for ESA by CRI with various subcontractors: (1) DI, Distributed Intelligence for Ground/Space Systems is an on-going research project; (2) GMPT, Generic Mission Planning Toolset, a feasibility study concluded in 1993; (3) OPTIMUM-AIV, Open Planning Tool for AIV, development of a knowledge based AIV planning and scheduling tool ended in 1992; and (4) PlanERS-1, development of an AI and knowledge-based mission planning prototype for the ERS-1 earth observation spacecraft ended in 1991.

  18. Assessment of pretend play in Prader-Willi syndrome: a direct comparison to autism spectrum disorder.

    PubMed

    Zyga, Olena; Russ, Sandra; Ievers-Landis, Carolyn E; Dimitropoulos, Anastasia

    2015-04-01

    Children with Prader-Willi syndrome (PWS) are at risk for autism spectrum disorder (ASD), including pervasive social deficits. While play impairments in ASD are well documented, play abilities in PWS have not been evaluated. Fourteen children with PWS and ten children with ASD were administered the Autism Diagnostic Observation Schedule (ADOS) (Lord et al. in Autism Diagnostic Observation Schedule manual. Western Psychological Services, Los Angeles, 2006) as part of a larger project. A modified Affect in Play Scale (APS; Russ in Play in child development and psychotherapy: toward empirically supported practice. Lawrence Erlbaum Associates Publishers, Mahwah, 2004; Pretend play in childhood: foundation of adult creativity. APA Books, Washington, 2014) was used to score ADOS play activities. Results indicate both groups scored below normative data on measures of imagination, organization, and affective expression during individual play. In addition, the inclusion of a play partner in both groups increased all scaled scores on the APS. These findings suggest children with PWS show impaired pretend play abilities similar to ASD. Further research is warranted and should focus on constructing and validating programs aimed at improving symbolic and functional play abilities within these populations.

  19. Anchorage Arrival Scheduling Under Off-Nominal Weather Conditions

    NASA Technical Reports Server (NTRS)

    Grabbe, Shon; Chan, William N.; Mukherjee, Avijit

    2012-01-01

    Weather can cause flight diversions, passenger delays, additional fuel consumption and schedule disruptions at any high volume airport. The impacts are particularly acute at the Ted Stevens Anchorage International Airport in Anchorage, Alaska due to its importance as a major international portal. To minimize the impacts due to weather, a multi-stage scheduling process is employed that is iteratively executed, as updated aircraft demand and/or airport capacity data become available. The strategic scheduling algorithm assigns speed adjustments for flights that originate outside of Anchorage Center to achieve the proper demand and capacity balance. Similarly, an internal departure-scheduling algorithm assigns ground holds for pre-departure flights that originate from within Anchorage Center. Tactical flight controls in the form of airborne holding are employed to reactively account for system uncertainties. Real-world scenarios that were derived from the January 16, 2012 Anchorage visibility observations and the January 12, 2012 Anchorage arrival schedule were used to test the initial implementation of the scheduling algorithm in fast-time simulation experiments. Although over 90% of the flights in the scenarios arrived at Anchorage without requiring any delay, pre-departure scheduling was the dominant form of control for Anchorage arrivals. Additionally, tactical scheduling was used extensively in conjunction with the pre-departure scheduling to reactively compensate for uncertainties in the arrival demand. For long-haul flights, the strategic scheduling algorithm performed best when the scheduling horizon was greater than 1,000 nmi. With these long scheduling horizons, it was possible to absorb between ten and 12 minutes of delay through speed control alone. Unfortunately, the use of tactical scheduling, which resulted in airborne holding, was found to increase as the strategic scheduling horizon increased because of the additional uncertainty in the arrival times

  20. The influence of parental concern on the utility of autism diagnostic instruments.

    PubMed

    Havdahl, Karoline Alexandra; Bishop, Somer L; Surén, Pål; Øyen, Anne-Siri; Lord, Catherine; Pickles, Andrew; von Tetzchner, Stephen; Schjølberg, Synnve; Gunnes, Nina; Hornig, Mady; Lipkin, W Ian; Susser, Ezra; Bresnahan, Michaeline; Magnus, Per; Stenberg, Nina; Reichborn-Kjennerud, Ted; Stoltenberg, Camilla

    2017-10-01

    The parental report-based Autism Diagnostic Interview-Revised (ADI-R) and the clinician observation-based Autism Diagnostic Observation Schedule (ADOS) have been validated primarily in U.S. clinics specialized in autism spectrum disorder (ASD), in which most children are referred by their parents because of ASD concern. This study assessed diagnostic agreement of the ADOS-2 and ADI-R toddler algorithms in a more broadly based sample of 679 toddlers (age 35-47 months) from the Norwegian Mother and Child Cohort. We also examined whether parental concern about ASD influenced instrument performance, comparing toddlers identified based on parental ASD concern (n = 48) and parent-reported signs of developmental problems (screening) without a specific concern about ASD (n = 400). The ADOS cutoffs showed consistently well-balanced sensitivity and specificity. The ADI-R cutoffs demonstrated good specificity, but reduced sensitivity, missing 43% of toddlers whose parents were not specifically concerned about ASD. The ADI-R and ADOS dimensional scores agreed well with clinical diagnoses (area under the curve ≥ 0.85), contributing additively to their prediction. On the ADI-R, different cutoffs were needed according to presence or absence of parental ASD concern, in order to achieve comparable balance of sensitivity and specificity. These results highlight the importance of taking parental concern about ASD into account when interpreting scores from parental report-based instruments such as the ADI-R. While the ADOS cutoffs performed consistently well, the additive contributions of ADI-R and ADOS scores to the prediction of ASD diagnosis underscore the value of combining instruments based on parent accounts and clinician observation in evaluation of ASD. Autism Res 2017, 10: 1672-1686. © 2017 International Society for Autism Research, Wiley Periodicals, Inc. © 2017 International Society for Autism Research, Wiley Periodicals, Inc.

  1. New AdoMet Analogues as Tools for Enzymatic Transfer of Photo-Cross-Linkers and Capturing RNA-Protein Interactions.

    PubMed

    Muttach, Fabian; Mäsing, Florian; Studer, Armido; Rentmeister, Andrea

    2017-05-02

    Elucidation of biomolecular interactions is of utmost importance in biochemistry. Photo-cross-linking offers the possibility to precisely determine RNA-protein interactions. However, despite the inherent specificity of enzymes, approaches for site-specific introduction of photo-cross-linking moieties into nucleic acids are scarce. Methyltransferases in combination with synthetic analogues of their natural cosubstrate S-adenosyl-l-methionine (AdoMet) allow for the post-synthetic site-specific modification of biomolecules. We report on three novel AdoMet analogues bearing the most widespread photo-cross-linking moieties (aryl azide, diazirine, and benzophenone). We show that these photo-cross-linkers can be enzymatically transferred to the methyltransferase target, that is, the mRNA cap, with high efficiency. Photo-cross-linking of the resulting modified mRNAs with the cap interacting protein eIF4E was successful with aryl azide and diazirine but not benzophenone, reflecting the affinity of the modified 5' caps. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  2. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  3. Superior Disembedding Performance in Childhood Predicts Adolescent Severity of Repetitive Behaviors: A Seven Years Follow-Up of Individuals With Autism Spectrum Disorder.

    PubMed

    Eussen, Mart L J M; Van Gool, Arthur R; Louwerse, Anneke; Verhulst, Frank C; Greaves-Lord, Kirstin

    2016-02-01

    Previous research suggests that individuals with autism spectrum disorder (ASD) show a detail-focused cognitive style. The aim of the current longitudinal study was to investigate whether this detail-focused cognitive style in childhood predicted a higher symptom severity of repetitive and restrictive behaviors and interests (RRBI) in adolescence. The Childhood Embedded Figures Test (CEFT) and the Autism Diagnostic Observation Schedule (ADOS) were administered in 87 children with ASD at the age of 6-12 years old (T1), and the ADOS was readministered 7 years later when the participants were 12-19 years old (T2). Linear regression analyses were performed to investigate whether accuracy and reaction time in the complex versus simple CEFT condition and performance in the complex condition predicted T2 ADOS RRBI calibrated severity scores (CSS), while taking into consideration relevant covariates and ADOS RRBI CSS at T1. The CEFT performance (accuracy in the complex condition divided by the time needed) significantly predicted higher ADOS RRBI CSS at T2 (ΔR(2)  = 15%). This finding further supports the detail-focused cognitive style in individuals with ASD, and shows that it is also predictive of future RRBI symptoms over time. © 2015 International Society for Autism Research, Wiley Periodicals, Inc.

  4. Car painting process scheduling with harmony search algorithm

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.

  5. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  6. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.

  7. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  8. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  9. Phase I Design for Completely or Partially Ordered Treatment Schedules

    PubMed Central

    Wages, Nolan A.; O’Quigley, John; Conaway, Mark R.

    2013-01-01

    The majority of methods for the design of Phase I trials in oncology are based upon a single course of therapy, yet in actual practice it may be the case that there is more than one treatment schedule for any given dose. Therefore, the probability of observing a dose-limiting toxicity (DLT) may depend upon both the total amount of the dose given, as well as the frequency with which it is administered. The objective of the study then becomes to find an acceptable combination of both dose and schedule. Past literature on designing these trials has entailed the assumption that toxicity increases monotonically with both dose and schedule. In this article, we relax this assumption for schedules and present a dose-schedule finding design that can be generalized to situations in which we know the ordering between all schedules and those in which we do not. We present simulation results that compare our method to other suggested dose-schedule finding methodology. PMID:24114957

  10. Research on schedulers for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Colome, Josep; Colomer, Pau; Guàrdia, Josep; Ribas, Ignasi; Campreciós, Jordi; Coiffard, Thierry; Gesa, Lluis; Martínez, Francesc; Rodler, Florian

    2012-09-01

    The main task of a scheduler applied to astronomical observatories is the time optimization of the facility and the maximization of the scientific return. Scheduling of astronomical observations is an example of the classical task allocation problem known as the job-shop problem (JSP), where N ideal tasks are assigned to M identical resources, while minimizing the total execution time. A problem of higher complexity, called the Flexible-JSP (FJSP), arises when the tasks can be executed by different resources, i.e. by different telescopes, and it focuses on determining a routing policy (i.e., which machine to assign for each operation) other than the traditional scheduling decisions (i.e., to determine the starting time of each operation). In most cases there is no single best approach to solve the planning system and, therefore, various mathematical algorithms (Genetic Algorithms, Ant Colony Optimization algorithms, Multi-Objective Evolutionary algorithms, etc.) are usually considered to adapt the application to the system configuration and task execution constraints. The scheduling time-cycle is also an important ingredient to determine the best approach. A shortterm scheduler, for instance, has to find a good solution with the minimum computation time, providing the system with the capability to adapt the selected task to varying execution constraints (i.e., environment conditions). We present in this contribution an analysis of the task allocation problem and the solutions currently in use at different astronomical facilities. We also describe the schedulers for three different projects (CTA, CARMENES and TJO) where the conclusions of this analysis are applied to develop a suitable routine.

  11. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  12. Towards a dynamical scheduler for ALMA: a science - software collaboration

    NASA Astrophysics Data System (ADS)

    Avarias, Jorge; Toledo, Ignacio; Espada, Daniel; Hibbard, John; Nyman, Lars-Ake; Hiriart, Rafael

    2016-07-01

    State-of-the art astronomical facilities are costly to build and operate, hence it is essential that these facilities must be operated as much efficiently as possible, trying to maximize the scientific output and at the same time minimizing overhead times. Over the latest decades the scheduling problem has drawn attention of research because new facilities have been demonstrated that is unfeasible to try to schedule observations manually, due the complexity to satisfy the astronomical and instrumental constraints and the number of scientific proposals to be reviewed and evaluated in near real-time. In addition, the dynamic nature of some constraints make this problem even more difficult. The Atacama Large Millimeter/submillimeter Array (ALMA) is a major collaboration effort between European (ESO), North American (NRAO) and East Asian countries (NAOJ), under operations on the Chilean Chajnantor plateau, at 5.000 meters of altitude. During normal operations at least two independent arrays are available, aiming to achieve different types of science. Since ALMA does not observe in the visible spectrum, observations are not limited to night time only, thus a 24/7 operation with little downtime as possible is expected when full operations state will have been reached. However, during preliminary operations (early-science) ALMA has been operated on tied schedules using around half of the whole day-time to conduct scientific observations. The purpose of this paper is to explain how the observation scheduling and its optimization is done within ALMA, giving details about the problem complexity, its similarities and differences with traditional scheduling problems found in the literature. The paper delves into the current recommendation system implementation and the difficulties found during the road to its deployment in production.

  13. Submarine watch schedules: underway evaluation of rotating (contemporary) and compressed (alternative) schedules.

    PubMed

    Duplessis, C A; Miller, J C; Crepeau, L J; Osborn, C M; Dyche, J

    2007-01-01

    With a desire to increase health, cognitive performance effectiveness, and quality of life for submarine watch-standers underway, we performed an evaluation comparing an alternative, compressed-work (ALT) schedule, designed to enhance circadian rhythm entrainment and sleep hygiene, to the contemporary submarine (SUB) forward rotating schedule, aboard the ballistic-missile submarine, USS Henry M. Jackson (SSBN-730 Gold). We assessed a compressed close-6 watch-schedule ("ALT") relative to the existing backward rotating 6-hr on, 12-hr off 18-hr watch schedule ("SUB") employed underway aboard submarines. We monitored 40 subjects' sleep, and temperature and salivary cortisol from 10 of the 40 for approximately two weeks on each respective schedule underway. The cortisol cosinor mesors (midline estimating statistic of rhythm), and amplitudes did not differ significantly between conditions. The temperature cosinor mesors, and the cosinor amplitude were not significantly different, while the cosine curve fit accounted for significantly more variance in the ALT condition than in the SUB condition. The SUB schedule garnered significantly more sleep (7.1 +/- 0.2 hours) than that of the ALTMID schedule (6.3 +/- 0.3 hours). Surveys revealed that 52% of respondents preferred the SUB schedule, 15% preferred the ALT, and 33% were either indifferent or submitted uninterpretable surveys. The ALT schedule was not superior to the existing SUB schedule by physiological or subjective measures and was incompatible to accommodating operational constraints.

  14. Web Publishing Schedule

    EPA Pesticide Factsheets

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  15. 12 CFR 407.3 - Procedures applicable to regularly scheduled meetings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Procedures applicable to regularly scheduled meetings. 407.3 Section 407.3 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES REGULATIONS GOVERNING PUBLIC OBSERVATION OF EX-IM BANK MEETINGS § 407.3 Procedures applicable to regularly scheduled...

  16. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  17. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    PubMed

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  18. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  19. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  20. Automatic Generation of Heuristics for Scheduling

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.; Bresina, John L.; Rodgers, Stuart M.

    1997-01-01

    This paper presents a technique, called GenH, that automatically generates search heuristics for scheduling problems. The impetus for developing this technique is the growing consensus that heuristics encode advice that is, at best, useful in solving most, or typical, problem instances, and, at worst, useful in solving only a narrowly defined set of instances. In either case, heuristic problem solvers, to be broadly applicable, should have a means of automatically adjusting to the idiosyncrasies of each problem instance. GenH generates a search heuristic for a given problem instance by hill-climbing in the space of possible multi-attribute heuristics, where the evaluation of a candidate heuristic is based on the quality of the solution found under its guidance. We present empirical results obtained by applying GenH to the real world problem of telescope observation scheduling. These results demonstrate that GenH is a simple and effective way of improving the performance of an heuristic scheduler.

  1. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  2. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  3. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  4. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  5. Single-Pass Serial Scheduling Heuristic for Eglin AFB Range Services Division Schedule

    DTIC Science & Technology

    2009-06-01

    scheduling tool for this RCPSP. Research on a schedule improvement metaheuristic and coding of the complete algorithm is required before it can be...a schedule better by applying metaheuristic improvement algorithms to a feasible schedule after it is created. 2.5.1. Greedy Algorithm The...next available position, the algorithm will not utilize all the available range time and manpower. An improvement metaheuristic is required to

  6. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.

  7. Constraint-based integration of planning and scheduling for space-based observatory management

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven F.

    1994-01-01

    Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.

  8. Scheduling Nonconsumable Resources

    NASA Technical Reports Server (NTRS)

    Porta, Harry J.

    1990-01-01

    Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

  9. A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet

    1996-01-01

    Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

  10. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  11. Second-order schedules: discrimination of components1

    PubMed Central

    Squires, Nancy; Norborg, James; Fantino, Edmund

    1975-01-01

    Pigeons were exposed to a series of second-order schedules in which the completion of a fixed number of fixed-interval components produced food. In Experiment 1, brief (2 sec) stimulus presentations occurred as each fixed-interval component was completed. During the brief-stimulus presentation terminating the last fixed-interval component, a response was required on a second key, the brief-stimulus key, to produce food. Responses on the brief-stimulus key before the last brief-stimulus presentation had no scheduled consequences, but served as a measure of the extent to which the final component was discriminated from preceding components. Whether there were one, two, four, or eight fixed-interval components, responses on the brief-stimulus key occurred during virtually every brief-stimulus presentation. In Experiment 2, an attempt was made to punish unnecessary responses on the brief-stimulus key, i.e., responses on the brief-stimulus key that occurred before the last component. None of the pigeons learned to withhold these responses, even though they produced a 15-sec timeout and loss of primary reinforcement. In Experiment 3, different key colors were associated with each component of a second-order schedule (a chain schedule). In contrast to Experiment 1, brief-stimulus key responses were confined to the last component. It was concluded that pigeons do not discriminate well between components of second-order schedules unless a unique exteroceptive cue is provided for each component. The relative discriminability of the components may account for the observed differences in initial-component response rates between comparable brief-stimulus, tandem, and chain schedules. PMID:16811868

  12. Increasing Crew Autonomy for Long Duration Exploration Missions: Self-Scheduling

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Hillenius, Steven; Deliz, Ivonne; Kanefsky, Bob; Zheng, Jimin; Reagan, Marcum L.

    2017-01-01

    Over the last three years, we have been investigating the operational concept of crew self-scheduling as a method of increasing crew autonomy for future exploration missions. Through Playbook, a planning and scheduling software tool, we have incrementally increased the ability for Earth analog mission crews to modify their schedules. Playbook allows the crew to add new activities from scratch, add new activities or groups of activities through a Task List, and reschedule or reassign flexible activities. The crew is also able to identify if plan modifications create violations, i.e., plan constraints not being met. This paper summarizes our observations with qualitative evidence from four NASA Extreme Environment Mission Operations (NEEMO) analog missions that supported self-scheduling as a feasible operational concept.

  13. Bullshit in Academic Writing: A Protocol Analysis of a High School Senior's Process of Interpreting "Much Ado about Nothing"

    ERIC Educational Resources Information Center

    Smagorinsky, Peter; Daigle, Elizabeth Anne; O'Donnell-Allen, Cindy; Bynum, Susan

    2010-01-01

    This article reports a study of one high school senior's process of academic bullshitting as she wrote an analytic essay interpreting Shakespeare's "Much Ado about Nothing." The construct of bullshit has received little scholarly attention; although it is known as a common phenomenon in academic speech and writing, it has rarely been the subject…

  14. Translating PI observing proposals into ALMA observing scripts

    NASA Astrophysics Data System (ADS)

    Liszt, Harvey S.

    2014-08-01

    The ALMA telescope is a complex 66-antenna array working in the specialized domain of mm- and sub-mm aperture synthesis imaging. To make ALMA accessible to technically inexperienced but scientifically expert users, the ALMA Observing Tool (OT) has been developed. Using the OT, scientifically oriented user input is formatted as observing proposals that are packaged for peer-review and assessment of technical feasibility. If accepted, the proposal's scientifically oriented inputs are translated by the OT into scheduling blocks, which function as input to observing scripts for the telescope's online control system. Here I describe the processes and practices by which this translation from PI scientific goals to online control input and schedule block execution actually occurs.

  15. Projecting Future Scheduled Airline Demand, Schedules and NGATS Benefits Using TSAM

    NASA Technical Reports Server (NTRS)

    Dollyhigh, Samuel; Smith, Jeremy; Viken, Jeff; Trani, Antonio; Baik, Hojong; Hinze, Nickolas; Ashiabor, Senanu

    2006-01-01

    The Transportation Systems Analysis Model (TSAM) developed by Virginia Tech s Air Transportation Systems Lab and NASA Langley can provide detailed analysis of the effects on the demand for air travel of a full range of NASA and FAA aviation projects. TSAM has been used to project the passenger demand for very light jet (VLJ) air taxi service, scheduled airline demand growth and future schedules, Next Generation Air Transportation System (NGATS) benefits, and future passenger revenues for the Airport and Airway Trust Fund. TSAM can project the resulting demand when new vehicles and/or technology is inserted into the long distance (100 or more miles one-way) transportation system, as well as, changes in demand as a result of fare yield increases or decreases, airport transit times, scheduled flight times, ticket taxes, reductions or increases in flight delays, and so on. TSAM models all long distance travel in the contiguous U.S. and determines the mode choice of the traveler based on detailed trip costs, travel time, schedule frequency, purpose of the trip (business or non-business), and household income level of the traveler. Demand is modeled at the county level, with an airport choice module providing up to three airports as part of the mode choice. Future enplanements at airports can be projected for different scenarios. A Fratar algorithm and a schedule generator are applied to generate future flight schedules. This paper presents the application of TSAM to modeling future scheduled air passenger demand and resulting airline schedules, the impact of NGATS goals and objectives on passenger demand, along with projections for passenger fee receipts for several scenarios for the FAA Airport and Airway Trust Fund.

  16. The LSST Scheduler from design to construction

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Reuter, Michael A.

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) will be a highly robotic facility, demanding a very high efficiency during its operation. To achieve this, the LSST Scheduler has been envisioned as an autonomous software component of the Observatory Control System (OCS), that selects the sequence of targets in real time. The Scheduler will drive the survey using optimization of a dynamic cost function of more than 200 parameters. Multiple science programs produce thousands of candidate targets for each observation, and multiple telemetry measurements are received to evaluate the external and the internal conditions of the observatory. The design of the LSST Scheduler started early in the project supported by Model Based Systems Engineering, detailed prototyping and scientific validation of the survey capabilities required. In order to build such a critical component, an agile development path in incremental releases is presented, integrated to the development plan of the Operations Simulator (OpSim) to allow constant testing, integration and validation in a simulated OCS environment. The final product is a Scheduler that is also capable of running 2000 times faster than real time in simulation mode for survey studies and scientific validation during commissioning and operations.

  17. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    PubMed

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  18. Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

    NASA Technical Reports Server (NTRS)

    Happell, Nadine; Moe, Karen L.; Minnix, Jay

    1993-01-01

    NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

  19. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  20. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  1. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  2. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  3. Perceptions of randomized security schedules.

    PubMed

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  4. Coordinating space telescope operations in an integrated planning and scheduling architecture

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela

    1992-01-01

    The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

  5. The Relationship between Social Affect and Restricted and Repetitive Behaviors Measured on the ADOS-2 and Maternal Stress

    ERIC Educational Resources Information Center

    Schutte, Claire; Richardson, Wendy; Devlin, Morgan; Hill, Jeanna; Ghossainy, Maliki; Hewitson, Laura

    2018-01-01

    This study investigated categories of autism spectrum disorder (ASD) symptoms measured by the Autism Diagnostic Observation Schedule-Second Edition and their association with maternal stress. Social affect and restricted and repetitive behaviors were compared with levels of maternal stress, measured by the Parenting Stress Index, in 102 children…

  6. The Search for a Subtype-Selective PET Imaging Agent for the GABAA Receptor Complex: Evaluation of the Radiotracer [11C]ADO in Nonhuman Primates.

    PubMed

    Lin, Shu-Fei; Bois, Frederic; Holden, Daniel; Nabulsi, Nabeel; Pracitto, Richard; Gao, Hong; Kapinos, Michael; Teng, Jo-Ku; Shirali, Anupama; Ropchan, Jim; Carson, Richard E; Elmore, Charles S; Vasdev, Neil; Huang, Yiyun

    2017-01-01

    The myriad physiological functions of γ-amino butyric acid (GABA) are mediated by the GABA-benzodiazepine receptor complex comprising of the GABA A , GABA B , and GABA C groups. The various GABA A subunits with region-specific distributions in the brain subserve different functional and physiological roles. For example, the sedative and anticonvulsive effects of classical benzodiazepines are attributed to the α 1 subunit, and the α 2 and α 3 subunits mediate the anxiolytic effect. To optimize pharmacotherapies with improved efficacy and devoid of undesirable side effects for the treatment of anxiety disorders, subtype-selective imaging radiotracers are required to assess target engagement at GABA sites and determine the dose-receptor occupancy relationships. The goal of this work was to characterize, in nonhuman primates, the in vivo binding profile of a novel positron emission tomography (PET) radiotracer, [ 11 C]ADO, which has been indicated to have functional selectivity for the GABA A α 2 /α 3 subunits. High specific activity [ 11 C]ADO was administrated to 3 rhesus monkeys, and PET scans of 120-minute duration were performed on the Focus-220 scanner. In the blood, [ 11 C]ADO metabolized at a fairly rapid rate, with ∼36% of the parent tracer remaining at 30 minutes postinjection. Uptake levels of [ 11 C]ADO in the brain were high (peak standardized uptake value of ∼3.0) and consistent with GABA A distribution, with highest activity levels in cortical areas, intermediate levels in cerebellum and thalamus, and lowest uptake in striatal regions and amygdala. Tissue kinetics was fast, with peak uptake in all brain regions within 20 minutes of tracer injection. The one-tissue compartment model provided good fits to regional time-activity curves and reliable measurement of kinetic parameters. The absolute test-retest variability of regional distribution volumes ( V T ) was low, ranging from 4.5% to 8.7%. Pretreatment with flumazenil (a subtype nonselective

  7. Composite Scheduling

    ERIC Educational Resources Information Center

    Childers, Gary L.; Ireland, Rebecca Weeks

    2005-01-01

    In education, there is no one best way to do anything. There are compelling reasons why some courses should be taught in longer segments of time, which the block schedule provides. There are also compelling reasons why some classes should be taught in shorter segments. At Watauga High School in Boone, North Carolina, an alternative schedule that…

  8. Autism Spectrum Disorder in the DSM-5: Diagnostic Sensitivity and Specificity in Early Childhood.

    PubMed

    Christiansz, Jessica A; Gray, Kylie M; Taffe, John; Tonge, Bruce J

    2016-06-01

    Changes to the DSM-5 Autism Spectrum Disorder (ASD) criteria raised concerns among parents and practitioners that the criteria may exclude some children with Pervasive Developmental Disorder (PDD). Few studies have examined DSM-5 sensitivity and specificity in children less than 5 years of age. This study evaluated 185 children aged 20-55 months with DSM-IV PDD or developmental delay. Autism Diagnostic Interview-Revised (ADI-R) and Autism Diagnostic Observation Schedule (ADOS) data was assigned to DSM-5 subdomains. Children displaying the required symptomatology were classified with DSM-5 ASD. DSM-IV clinical diagnoses were compared to DSM-5 classifications. Using combined ADI-R/ADOS information, sensitivity was .84 and specificity was .54. Comorbid behaviour and emotional problems were significantly lower in children with PDD that did not meet DSM-5 criteria.

  9. Parent and Teacher Concordance on the Social Responsiveness Scale for Children with Autism.

    PubMed

    Azad, Gazi; Reisinger, Erica; Xie, Ming; Mandell, David S

    2016-09-01

    There are inconsistent findings regarding parent and teacher agreement on behavioral ratings of their children with autism. One possible reason for this inconsistency is that studies have not taken autism severity into account. This study examined parent and teacher concordance of social behavior based on symptom severity for children with autism. Participants were 123 parent-teacher dyads who completed the Social Responsiveness Scale. Symptom severity was assessed using the Autism Diagnostic Observation Schedule (ADOS). Results indicated that parent and teacher ratings were statistically significantly correlated at the beginning and end of the academic year, but only for severely affected children. Teacher report of social deficits was correlated with symptom severity as measured by the ADOS; parent report was not. These findings have implications for improving assessment procedures and parent-teacher collaboration.

  10. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  11. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  12. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  13. Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    This paper is a progress report on the Spike scheduling system, developed by the Space Telescope Science Institute for long-term scheduling of Hubble Space Telescope (HST) observations. Spike is an activity-based scheduler which exploits artificial intelligence (AI) techniques for constraint representation and for scheduling search. The system has been in operational use since shortly after HST launch in April 1990. Spike was adopted for several other satellite scheduling problems; of particular interest was the demonstration that the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. We describe the recent progress made in scheduling search techniques, the lessons learned from early HST operations, and the application of Spike to other problem domains. We also describe plans for the future evolution of the system.

  14. Engaging the Observer

    NASA Astrophysics Data System (ADS)

    Clark, M.

    2009-09-01

    In the past, the physical presence and direct interaction of the astronomer with an observatory's staff and telescope equipment encouraged understanding and responsiveness between both staff and observers. But now, observatories often face the problem of expediently exchanging information with observers. New observatory procedures and policies such as automated-, remote- and service-observing, dynamic scheduling, data pipelining, or fully software-arbitrated telescope control provide for more efficient telescope use, but they have reduced the role of the observer to that of a customer rather than a partner in the process of observing. Topics for discussion will include scheduling, data quality, control interfaces, training and preparation for observing, and information distribution technologies, e.g., use of web sites, email, and RSS feeds.

  15. Operations research methods improve chemotherapy patient appointment scheduling.

    PubMed

    Santibáñez, Pablo; Aristizabal, Ruben; Puterman, Martin L; Chow, Vincent S; Huang, Wenhai; Kollmannsberger, Christian; Nordin, Travis; Runzer, Nancy; Tyldesley, Scott

    2012-12-01

    Clinical complexity, scheduling restrictions, and outdated manual booking processes resulted in frequent clerical rework, long waitlists for treatment, and late appointment notification for patients at a chemotherapy clinic in a large cancer center in British Columbia, Canada. A 17-month study was conducted to address booking, scheduling and workload issues and to develop, implement, and evaluate solutions. A review of scheduling practices included process observation and mapping, analysis of historical appointment data, creation of a new performance metric (final appointment notification lead time), and a baseline patient satisfaction survey. Process improvement involved discrete event simulation to evaluate alternative booking practice scenarios, development of an optimization-based scheduling tool to improve scheduling efficiency, and change management for implementation of process changes. Results were evaluated through analysis of appointment data, a follow-up patient survey, and staff surveys. Process review revealed a two-stage scheduling process. Long waitlists and late notification resulted from an inflexible first-stage process. The second-stage process was time consuming and tedious. After a revised, more flexible first-stage process and an automated second-stage process were implemented, the median percentage of appointments exceeding the final appointment notification lead time target of one week was reduced by 57% and median waitlist size decreased by 83%. Patient surveys confirmed increased satisfaction while staff feedback reported reduced stress levels. Significant operational improvements can be achieved through process redesign combined with operations research methods.

  16. Improved Weather Forecasting for the Dynamic Scheduling System of the Green Bank Telescope

    NASA Astrophysics Data System (ADS)

    Henry, Kari; Maddalena, Ronald

    2018-01-01

    The Robert C Byrd Green Bank Telescope (GBT) uses a software system that dynamically schedules observations based on models of vertical weather forecasts produced by the National Weather Service (NWS). The NWS provides hourly forecasted values for ~60 layers that extend into the stratosphere over the observatory. We use models, recommended by the Radiocommunication Sector of the International Telecommunications Union, to derive the absorption coefficient in each layer for each hour in the NWS forecasts and for all frequencies over which the GBT has receivers, 0.1 to 115 GHz. We apply radiative transfer models to derive the opacity and the atmospheric contributions to the system temperature, thereby deriving forecasts applicable to scheduling radio observations for up to 10 days into the future. Additionally, the algorithms embedded in the data processing pipeline use historical values of the forecasted opacity to calibrate observations. Until recently, we have concentrated on predictions for high frequency (> 15 GHz) observing, as these need to be scheduled carefully around bad weather. We have been using simple models for the contribution of rain and clouds since we only schedule low-frequency observations under these conditions. In this project, we wanted to improve the scheduling of the GBT and data calibration at low frequencies by deriving better algorithms for clouds and rain. To address the limitation at low frequency, the observatory acquired a Radiometrics Corporation MP-1500A radiometer, which operates in 27 channels between 22 and 30 GHz. By comparing 16 months of measurements from the radiometer against forecasted system temperatures, we have confirmed that forecasted system temperatures are indistinguishable from those measured under good weather conditions. Small miss-calibrations of the radiometer data dominate the comparison. By using recalibrated radiometer measurements, we looked at bad weather days to derive better models for forecasting the

  17. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  18. Evaluating Sex and Age Differences in ADI-R and ADOS Scores in a Large European Multi-site Sample of Individuals with Autism Spectrum Disorder.

    PubMed

    Tillmann, J; Ashwood, K; Absoud, M; Bölte, S; Bonnet-Brilhault, F; Buitelaar, J K; Calderoni, S; Calvo, R; Canal-Bedia, R; Canitano, R; De Bildt, A; Gomot, M; Hoekstra, P J; Kaale, A; McConachie, H; Murphy, D G; Narzisi, A; Oosterling, I; Pejovic-Milovancevic, M; Persico, A M; Puig, O; Roeyers, H; Rommelse, N; Sacco, R; Scandurra, V; Stanfield, A C; Zander, E; Charman, T

    2018-02-21

    Research on sex-related differences in Autism Spectrum Disorder (ASD) has been impeded by small samples. We pooled 28 datasets from 18 sites across nine European countries to examine sex differences in the ASD phenotype on the ADI-R (376 females, 1763 males) and ADOS (233 females, 1187 males). On the ADI-R, early childhood restricted and repetitive behaviours were lower in females than males, alongside comparable levels of social interaction and communication difficulties in females and males. Current ADI-R and ADOS scores showed no sex differences for ASD severity. There were lower socio-communicative symptoms in older compared to younger individuals. This large European ASD sample adds to the literature on sex and age variations of ASD symptomatology.

  19. Understanding London's Water Supply Tradeoffs When Scheduling Interventions Under Deep Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2015-12-01

    Water supply planning in many major world cities faces several challenges associated with but not limited to climate change, population growth and insufficient land availability for infrastructure development. Long-term plans to maintain supply-demand balance and ecosystem services require careful consideration of uncertainties associated with future conditions. The current approach for London's water supply planning utilizes least cost optimization of future intervention schedules with limited uncertainty consideration. Recently, the focus of the long-term plans has shifted from solely least cost performance to robustness and resilience of the system. Identifying robust scheduling of interventions requires optimizing over a statistically representative sample of stochastic inputs which may be computationally difficult to achieve. In this study we optimize schedules using an ensemble of plausible scenarios and assess how manipulating that ensemble influences the different Pareto-approximate intervention schedules. We investigate how a major stress event's location in time as well as the optimization problem formulation influence the Pareto-approximate schedules. A bootstrapping method that respects the non-stationary trend of climate change scenarios and ensures the even distribution of the major stress event in the scenario ensemble is proposed. Different bootstrapped hydrological scenario ensembles are assessed using many-objective scenario optimization of London's future water supply and demand intervention scheduling. However, such a "fixed" scheduling of interventions approach does not aim to embed flexibility or adapt effectively as the future unfolds. Alternatively, making decisions based on the observations of occurred conditions could help planners who prefer adaptive planning. We will show how rules to guide the implementation of interventions based on observations may result in more flexible strategies.

  20. The GBT Dynamic Scheduling System: Development and Testing

    NASA Astrophysics Data System (ADS)

    McCarty, M.; Clark, M.; Marganian, P.; O'Neil, K.; Shelton, A.; Sessoms, E.

    2009-09-01

    During the summer trimester of 2008, all observations on the Robert C. Byrd Green Bank Telescope (GBT) were scheduled using the new Dynamic Scheduling System (DSS). Beta testing exercised the policies, algorithms, and software developed for the DSS project. Since observers are located all over the world, the DSS was implemented as a web application. Technologies such as iCalendar, Really Simple Syndication (RSS) feeds, email, and instant messaging are used to transfer as much or as little information to observers as they request. We discuss the software engineering challenges leading to our implementation such as information distribution and building rich user interfaces in the web browser. We also relate our adaptation of agile development practices to design and develop the DSS. Additionally, we describe handling differences in expected versus actual initial conditions in the pool of project proposals for the 08B trimester. We then identify lessons learned from beta testing and present statistics on how the DSS was used during the trimester.

  1. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  2. Research on a Queue Scheduling Algorithm in Wireless Communications Network

    NASA Astrophysics Data System (ADS)

    Yang, Wenchuan; Hu, Yuanmei; Zhou, Qiancai

    This paper proposes a protocol QS-CT, Queue Scheduling Mechanism based on Multiple Access in Ad hoc net work, which adds queue scheduling mechanism to RTS-CTS-DATA using multiple access protocol. By endowing different queues different scheduling mechanisms, it makes networks access to the channel much more fairly and effectively, and greatly enhances the performance. In order to observe the final performance of the network with QS-CT protocol, we simulate it and compare it with MACA/C-T without QS-CT protocol. Contrast to MACA/C-T, the simulation result shows that QS-CT has greatly improved the throughput, delay, rate of packets' loss and other key indicators.

  3. Production Scheduling for Rehabilitation Workshops.

    ERIC Educational Resources Information Center

    Hietala, David A.

    This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…

  4. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  5. Nonstandard Maternal Work Schedules: Implications for African American Children's Early Language Outcomes

    ERIC Educational Resources Information Center

    Odom, Erika C.; Vernon-Feagans, Lynne; Crouter, Ann C.

    2013-01-01

    In this study, observed maternal positive engagement and perception of work-family spillover were examined as mediators of the association between maternal nonstandard work schedules and children's expressive language outcomes in 231 African American families living in rural households. Mothers reported their work schedules when their child was 24…

  6. Artificial intelligence for the CTA Observatory scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  7. The temporal organization of behavior on periodic food schedules.

    PubMed Central

    Reid, A K; Bacha, G; Morán, C

    1993-01-01

    Various theories of temporal control and schedule induction imply that periodic schedules temporally modulate an organism's motivational states within interreinforcement intervals. This speculation has been fueled by frequently observed multimodal activity distributions created by averaging across interreinforcement intervals. We tested this hypothesis by manipulating the cost associated with schedule-induced activities and the availability of other activities to determine the degree to which (a) the temporal distributions of activities within the interreinforcement interval are fixed or can be temporally displaced, (b) rats can reallocate activities across different interreinforcement intervals, and (c) noninduced activities can substitute for schedule-induced activities. Obtained multimodal activity distributions created by averaging across interreinforcement intervals were not representative of the transitions occurring within individual intervals, so the averaged multimodal distributions should not be assumed to represent changes in the subject's motivational states within the interval. Rather, the multimodal distributions often result from averaging across interreinforcement intervals in which only a single activity occurs. A direct influence of the periodic schedule on the motivational states implies that drinking and running should occur at different periods within the interval, but in three experiments the starting times of drinking and running within interreinforcement intervals were equal. Thus, the sequential pattern of drinking and running on periodic schedules does not result from temporal modulation of motivational states within interreinforcement intervals. PMID:8433061

  8. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2004-01-01

    Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

  9. Surgical demand scheduling: a review.

    PubMed Central

    Magerlein, J M; Martin, J B

    1978-01-01

    This article reviews the literature on scheduling of patient demand for surgery and outlines an approach to improving overall performance of hospital surgical suites. Reported scheduling systems are categorized into those that schedule patients in advance of the surgical date and those that schedule available patients on the day of surgery. Approaches to estimating surgical procedure times are also reviewed, and the article concludes with a discussion of the failure to implement the majority of reported scheduling schemes. PMID:367987

  10. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  11. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  12. Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

    NASA Technical Reports Server (NTRS)

    Smith, Stephen F.; Pathak, Dhiraj K.

    1991-01-01

    In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

  13. Effects of Cocaine on Performance under Fixed-Interval Schedules with a Small Tandem Ratio Requirement

    ERIC Educational Resources Information Center

    Pinkston, Jonathan W.; Branch, Marc N.

    2004-01-01

    Daily administration of cocaine often results in the development of tolerance to its effects on responding maintained by fixed-ratio schedules. Such effects have been observed to be greater when the ratio value is small, whereas less or no tolerance has been observed at large ratio values. Similar schedule-parameter-dependent tolerance, however,…

  14. Adapting immunisation schedules for children undergoing chemotherapy.

    PubMed

    Fernández-Prada, María; Rodríguez-Martínez, María; García-García, Rebeca; García-Corte, María Dolores; Martínez-Ortega, Carmen

    2018-02-01

    Children undergoing chemotherapy for cancer have special vaccination needs after completion of the treatment. The aim of this study was to evaluate the adaptation of post-chemotherapy vaccination schedules. An observational study was performed on a retrospective cohort that included all children aged from 0 to 14 years, who completed chemotherapy in a tertiary hospital between 2009 and 2015. Inclusion and exclusion criteria were applied. Immunisation was administered in accordance with the guidelines of the Vaccine Advisory Committee of the Spanish Association of Paediatrics. Primary Care immunisation and clinical records of the Preventive Medicine and Public Health Department were reviewed. Of the 99 children who had received chemotherapy, 51 (70.6% males) were included in the study. As regards the type of tumour, 54.9% had a solid organ tumour, and 45.1% had a haematological tumour. Post-chemotherapy immunisation was administered to 70.6%. The most common vaccines received were: diphtheria-tetanus-pertussis or diphtheria-tetanus (54.9%), meningococcus C (41.2%), and seasonal influenza (39.2%). The rate of adaptation of the immunisation schedule after chemotherapy was 9.8%. The pneumococcal conjugate vaccine against 7v or 13v was administered to 21.6% of study subjects. However, only 17.6% received polysaccharide 23v. None received vaccination against hepatitis A. No statistically significant differences were observed between adherence to immunisation schedules and type of tumour (P=.066), gender (P=.304), or age (P=.342). Post-chemotherapy immunisation of children with cancer is poor. The participation of health professionals in training programs and referral of paediatric cancer patients to Vaccine Units could improve the rate of schedule adaptation and proper immunisation of this population. Copyright © 2016 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  15. Multi-Satellite Scheduling Approach for Dynamic Areal Tasks Triggered by Emergent Disasters

    NASA Astrophysics Data System (ADS)

    Niu, X. N.; Zhai, X. J.; Tang, H.; Wu, L. X.

    2016-06-01

    The process of satellite mission scheduling, which plays a significant role in rapid response to emergent disasters, e.g. earthquake, is used to allocate the observation resources and execution time to a series of imaging tasks by maximizing one or more objectives while satisfying certain given constraints. In practice, the information obtained of disaster situation changes dynamically, which accordingly leads to the dynamic imaging requirement of users. We propose a satellite scheduling model to address dynamic imaging tasks triggered by emergent disasters. The goal of proposed model is to meet the emergency response requirements so as to make an imaging plan to acquire rapid and effective information of affected area. In the model, the reward of the schedule is maximized. To solve the model, we firstly present a dynamic segmenting algorithm to partition area targets. Then the dynamic heuristic algorithm embedding in a greedy criterion is designed to obtain the optimal solution. To evaluate the model, we conduct experimental simulations in the scene of Wenchuan Earthquake. The results show that the simulated imaging plan can schedule satellites to observe a wider scope of target area. We conclude that our satellite scheduling model can optimize the usage of satellite resources so as to obtain images in disaster response in a more timely and efficient manner.

  16. Exclusive Preference Develops Less Readily on Concurrent Ratio Schedules with Wheel-Running than with Sucrose Reinforcement

    ERIC Educational Resources Information Center

    Belke, Terry W.

    2010-01-01

    Previous research suggested that allocation of responses on concurrent schedules of wheel-running reinforcement was less sensitive to schedule differences than typically observed with more conventional reinforcers. To assess this possibility, 16 female Long Evans rats were exposed to concurrent FR FR schedules of reinforcement and the schedule…

  17. Food-deprivation effects on punished schedule-induced drinking in rats.

    PubMed Central

    Lamas, E; Pellón, R

    1995-01-01

    Food-deprived rats (at 80% of their free-feeding weights) were exposed to a fixed-time 60-s schedule of food-pellet presentation and developed schedule-induced drinking. Lick-dependent signaled delays (10 s) to food presentation led to decreased drinking, which recovered when the signaled delays were discontinued. A major effect of this punishment contingency was to increase the proportion of interpellet intervals without any licks. The drinking of yoked control rats, which received food at the same times as those exposed to the signaled delay contingency (masters), was not consistently reduced. When food-deprivation level was changed to 90%, all master and yoked control rats showed decreases in punished or unpunished schedule-induced drinking. When the body weights were reduced to 70%, most master rats increased punished behavior to levels similar to those of unpunished drinking. This effect was not observed for yoked controls. Therefore, body-weight loss increased the resistance of schedule-induced drinking to reductions by punishment. Food-deprivation effects on punished schedule-induced drinking are similar to their effects on food-maintained lever pressing. This dependency of punishment on food-deprivation level supports the view that schedule-induced drinking can be modified by the same variables that affect operant behavior in general. PMID:7622981

  18. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    NASA Astrophysics Data System (ADS)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, ∼40 kg in development) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging in the commercial market, Cubesats now have the ability to slew and capture images within short notice. We propose a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying, full-body orientation of agile Cubesats in a constellation such that they maximize the number of observed images and observation time, within the constraints of Cubesat hardware specifications. The attitude control strategy combines bang-bang and PD control, with constraints such as power consumption, response time, and stability factored into the optimality computations and a possible extension to PID control to account for disturbances. Schedule optimization is performed using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. The automated scheduler is expected to run on ground station resources and the resultant schedules uplinked to the satellites for execution, however it can be adapted for onboard scheduling, contingent on Cubesat hardware and software upgrades. The framework is generalizable over small steerable spacecraft, sensor specifications, imaging objectives and regions of interest, and is demonstrated using multiple 20 kg satellites in Low Earth Orbit for two case studies - rapid imaging of Landsat's land and coastal images and extended imaging of global, warm water coral reefs. The proposed algorithm captures up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-h simulation. Integer programming was able to verify that

  19. 1993 Wholesale Power and Transmission Rate Schedules.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  20. Strategies GeoCape Intelligent Observation Studies @ GSFC

    NASA Technical Reports Server (NTRS)

    Cappelaere, Pat; Frye, Stu; Moe, Karen; Mandl, Dan; LeMoigne, Jacqueline; Flatley, Tom; Geist, Alessandro

    2015-01-01

    This presentation provides information a summary of the tradeoff studies conducted for GeoCape by the GSFC team in terms of how to optimize GeoCape observation efficiency. Tradeoffs include total ground scheduling with simple priorities, ground scheduling with cloud forecast, ground scheduling with sub-area forecast, onboard scheduling with onboard cloud detection and smart onboard scheduling and onboard image processing. The tradeoffs considered optimzing cost, downlink bandwidth and total number of images acquired.

  1. Automated and dynamic scheduling for geodetic VLBI - A simulation study for AuScope and global networks

    NASA Astrophysics Data System (ADS)

    Iles, E. J.; McCallum, L.; Lovell, J. E. J.; McCallum, J. N.

    2018-02-01

    As we move into the next era of geodetic VLBI, the scheduling process is one focus for improvement in terms of increased flexibility and the ability to react with changing conditions. A range of simulations were conducted to ascertain the impact of scheduling on geodetic results such as Earth Orientation Parameters (EOPs) and station coordinates. The potential capabilities of new automated scheduling modes were also simulated, using the so-called 'dynamic scheduling' technique. The primary aim was to improve efficiency for both cost and time without losing geodetic precision, particularly to maximise the uses of the Australian AuScope VLBI array. We show that short breaks in observation will not significantly degrade the results of a typical 24 h experiment, whereas simply shortening observing time degrades precision exponentially. We also confirm the new automated, dynamic scheduling mode is capable of producing the same standard of result as a traditional schedule, with close to real-time flexibility. Further, it is possible to use the dynamic scheduler to augment the 3 station Australian AuScope array and thereby attain EOPs of the current global precision with only intermittent contribution from 2 additional stations. We thus confirm automated, dynamic scheduling bears great potential for flexibility and automation in line with aims for future continuous VLBI operations.

  2. Long-Term Effectiveness of Accelerated Hepatitis B Vaccination Schedule in Drug Users

    PubMed Central

    Shah, Dimpy P.; Grimes, Carolyn Z.; Nguyen, Anh T.; Lai, Dejian

    2015-01-01

    Objectives. We demonstrated the effectiveness of an accelerated hepatitis B vaccination schedule in drug users. Methods. We compared the long-term effectiveness of accelerated (0–1–2 months) and standard (0–1–6 months) hepatitis B vaccination schedules in preventing hepatitis B virus (HBV) infections and anti-hepatitis B (anti-HBs) antibody loss during 2-year follow-up in 707 drug users (HIV and HBV negative at enrollment and completed 3 vaccine doses) from February 2004 to October 2009. Results. Drug users in the accelerated schedule group had significantly lower HBV infection rates, but had a similar rate of anti-HBs antibody loss compared with the standard schedule group over 2 years of follow-up. No chronic HBV infections were observed. Hepatitis C positivity at enrollment and age younger than 40 years were independent risk factors for HBV infection and antibody loss, respectively. Conclusions. An accelerated vaccination schedule was more preferable than a standard vaccination schedule in preventing HBV infections in drug users. To overcome the disadvantages of a standard vaccination schedule, an accelerated vaccination schedule should be considered in drug users with low adherence. Our study should be repeated in different cohorts to validate our findings and establish the role of an accelerated schedule in hepatitis B vaccination guidelines for drug users. PMID:25880946

  3. Teaching strategies and student achievement in high school block scheduled biology classes

    NASA Astrophysics Data System (ADS)

    Louden, Cynthia Knapp

    The objectives of this study included determining whether teachers in block or traditionally scheduled biology classes (1) implement inquiry-based instruction more often or with different methods, (2) understand the concept of inquiry-based instruction as it is described in the National Science Standards, (3) have classes with significantly different student achievement, and (4) believe that their school schedule facilitates their use of inquiry-based instruction in the classroom. Biology teachers in block and non-block scheduled classes were interviewed, surveyed, and observed to determine the degree to which they implement inquiry-based instructional practices in their classrooms. State biology exams were used to indicate student achievement. Teachers in block scheduled and traditional classes used inquiry-based instruction with nearly the same frequency. Approximately 30% of all teachers do not understand the concept of inquiry-based instruction as described by the National Science Standards. No significant achievement differences between block and traditionally scheduled biology classes were found using ANCOVA analyses and a nonequivalent control-group quasi-experimental design. Using the same analysis techniques, significant achievement differences were found between biology classes with teachers who used inquiry-based instruction frequently and infrequently. Teachers in block schedules believed that their schedules facilitated inquiry-based instruction more than teachers in traditional schedules.

  4. Complex ambulatory settings demand scheduling systems.

    PubMed

    Ross, K M

    1998-01-01

    Practice management systems are becoming more and more complex, as they are asked to integrate all aspects of patient and resource management. Although patient scheduling is a standard expectation in any ambulatory environment, facilities and equipment resource scheduling are additional functionalities of scheduling systems. Because these functions were not typically managed in manual patient scheduling, often the result was resource mismanagement, along with a potential negative impact on utilization, patient flow and provider productivity. As ambulatory organizations have become more seasoned users of practice management software, the value of resource scheduling has become apparent. Appointment scheduling within a fully integrated practice management system is recognized as an enhancement of scheduling itself and provides additional tools to manage other information needs. Scheduling, as one component of patient information management, provides additional tools in these areas.

  5. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    ERIC Educational Resources Information Center

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  6. Response Strength in Extreme Multiple Schedules

    PubMed Central

    McLean, Anthony P; Grace, Randolph C; Nevin, John A

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess resistance to change. Contrary to the generalized matching law, logarithms of response ratios in the two components were not a linear function of log reinforcer ratios, implying a failure of parameter invariance. Over a 2 log unit range, the function appeared linear and indicated undermatching, but in conditions with more extreme reinforcer ratios, approximate matching was observed. A model suggested by McLean (1991), originally for local contrast, predicts these changes in sensitivity to reinforcer ratios somewhat better than models by Herrnstein (1970) and by Williams and Wixted (1986). Prefeeding tests of resistance to change were conducted at each reinforcer ratio, and relative resistance to change was also a nonlinear function of log reinforcer ratios, again contrary to conclusions from previous work. Instead, the function suggests that resistance to change in a component may be determined partly by the rate of reinforcement and partly by the ratio of reinforcers to responses. PMID:22287804

  7. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  8. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  9. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  10. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement [Dollars in thousands] () Greyhound Lines, Inc...

  11. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  12. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  13. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... the serious health condition of a covered family member or the employee or the serious injury or...

  14. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  15. Schedule-dependent response of neuroblastoma cell lines to combinations of etoposide and cisplatin

    PubMed Central

    Meczes, E L; Pearson, A D J; Austin, C A; Tilby, M J

    2002-01-01

    The growth inhibitory effects of cisplatin and etoposide on neuroblastoma cell lines were investigated in several scheduled combinations. Results were analyzed using median effect and combination index analyses. In all schedules in which cisplatin was administered prior to etoposide a synergistic effect was observed. Conversely, an antagonistic effect was seen in all schedules where etoposide was administered before cisplatin. British Journal of Cancer (2002) 86, 485–489. DOI: 10.1038/sj/bjc/6600060 www.bjcancer.com © 2002 The Cancer Research Campaign PMID:11875719

  16. Reactive Scheduling in Multipurpose Batch Plants

    NASA Astrophysics Data System (ADS)

    Narayani, A.; Shaik, Munawar A.

    2010-10-01

    Scheduling is an important operation in process industries for improving resource utilization resulting in direct economic benefits. It has a two-fold objective of fulfilling customer orders within the specified time as well as maximizing the plant profit. Unexpected disturbances such as machine breakdown, arrival of rush orders and cancellation of orders affect the schedule of the plant. Reactive scheduling is generation of a new schedule which has minimum deviation from the original schedule in spite of the occurrence of unexpected events in the plant operation. Recently, Shaik & Floudas (2009) proposed a novel unified model for short-term scheduling of multipurpose batch plants using unit-specific event-based continuous time representation. In this paper, we extend the model of Shaik & Floudas (2009) to handle reactive scheduling.

  17. Schedule-Aware Workflow Management Systems

    NASA Astrophysics Data System (ADS)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  18. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  19. Self-scheduling with Microsoft Excel.

    PubMed

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  20. Mission and science activity scheduling language

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1993-01-01

    To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

  1. Block Scheduling in High Schools.

    ERIC Educational Resources Information Center

    Irmsher, Karen

    1996-01-01

    Block Scheduling has been considered a cure for a lengthy list of educational problems. This report reviews the literature on block schedules and describes some Oregon high schools that have integrated block scheduling. Major disadvantages included resistance to change and requirements that teachers change their teaching strategies. There is…

  2. COMPASS: An Ada based scheduler

    NASA Technical Reports Server (NTRS)

    Mcmahon, Mary Beth; Culbert, Chris

    1992-01-01

    COMPASS is a generic scheduling system developed by McDonnell Douglas and funded by the Software Technology Branch of NASA Johnson Space Center. The motivation behind COMPASS is to illustrate scheduling technology and provide a basis from which custom scheduling systems can be built. COMPASS was written in Ada to promote readability and to conform to DOD standards. COMPASS has some unique characteristics that distinguishes it from commercial products. This paper discusses these characteristics and uses them to illustrate some differences between scheduling tools.

  3. Pre-Scheduled and Self Organized Sleep-Scheduling Algorithms for Efficient K-Coverage in Wireless Sensor Networks

    PubMed Central

    Hwang, I-Shyan

    2017-01-01

    The K-coverage configuration that guarantees coverage of each location by at least K sensors is highly popular and is extensively used to monitor diversified applications in wireless sensor networks. Long network lifetime and high detection quality are the essentials of such K-covered sleep-scheduling algorithms. However, the existing sleep-scheduling algorithms either cause high cost or cannot preserve the detection quality effectively. In this paper, the Pre-Scheduling-based K-coverage Group Scheduling (PSKGS) and Self-Organized K-coverage Scheduling (SKS) algorithms are proposed to settle the problems in the existing sleep-scheduling algorithms. Simulation results show that our pre-scheduled-based KGS approach enhances the detection quality and network lifetime, whereas the self-organized-based SKS algorithm minimizes the computation and communication cost of the nodes and thereby is energy efficient. Besides, SKS outperforms PSKGS in terms of network lifetime and detection quality as it is self-organized. PMID:29257078

  4. Replication and Comparison of the Newly Proposed ADOS-2, Module 4 Algorithm in ASD without ID: A Multi-Site Study

    ERIC Educational Resources Information Center

    Pugliese, Cara E.; Kenworthy, Lauren; Bal, Vanessa Hus; Wallace, Gregory L.; Yerys, Benjamin E.; Maddox, Brenna B.; White, Susan W.; Popal, Haroon; Armour, Anna Chelsea; Miller, Judith; Herrington, John D.; Schultz, Robert T.; Martin, Alex; Anthony, Laura Gutermuth

    2015-01-01

    Recent updates have been proposed to the Autism Diagnostic Observation Schedule-2 Module 4 diagnostic algorithm. This new algorithm, however, has not yet been validated in an independent sample without intellectual disability (ID). This multi-site study compared the original and revised algorithms in individuals with ASD without ID. The revised…

  5. Spitzer Operations: Scheduling the Out Years

    NASA Technical Reports Server (NTRS)

    Mahoney, William A.; Effertz, Mark J.; Fisher, Mark E.; Garcia, Lisa J.; Hunt, Joseph C. Jr.; Mannings, Vincent; McElroy, Douglas B.; Scire, Elena

    2012-01-01

    Spitzer Warm Mission operations have remained robust and exceptionally efficient since the cryogenic mission ended in mid-2009. The distance to the now exceeds 1 AU, making telecommunications increasingly difficult; however, analysis has shown that two-way communication could be maintained through at least 2017 with minimal loss in observing efficiency. The science program continues to emphasize the characterization of exoplanets, time domain studies, and deep surveys, all of which can impose interesting scheduling constraints. Recent changes have significantly improved on-board data compression, which both enables certain high volume observations and reduces Spitzer's demand for competitive Deep Space Network resources.

  6. Instant Childhood Immunization Schedule

    MedlinePlus

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  7. Nontraditional work schedules for pharmacists.

    PubMed

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  8. Flexible Scheduling to Fit the Firefighters.

    ERIC Educational Resources Information Center

    Cox, Clarice Robinson

    Three flexible scheduling plans were tried in order that firefighters could take regular college courses despite their 24 hours on the 24 off work schedule. Plan one scheduled the firefighters into a regular Monday-Wednesday-Friday class which they attended every other week, making up missed material outside of class. Plan two scheduled special…

  9. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  10. INTRODUCTION TO THE USE OF THE COPING ANALYSIS SCHEDULE FOR EDUCATIONAL SETTINGS (CASES) AND THE SPAULDING TEACHER ACTIVITY RATING SCHEDULE (STARS).

    ERIC Educational Resources Information Center

    SPAULDING, ROBERT L.

    THIS BOOKLET INTRODUCES TWO MEASUREMENT INSTRUMENTS FOCUSING ON CLASS MANAGEMENT. THE COPING ANALYSIS SCHEDULE FOR EDUCATIONAL SETTINGS PERMITS THE CODIFICATION OF ALL OPERANT BEHAVIOR OBSERVED IN THE CLASSROOM, INTO ONE OF THIRTEEN CATEGORIES. ALL BUT ONE OF THE THIRTEEN CATEGORIES ARE DESIGNED TO CHARACTERIZE THE CHILD'S ECONOMY WITH THE…

  11. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  12. State Alternative Work Schedule Manual.

    ERIC Educational Resources Information Center

    Long, Marion C.; Post, Susan W.

    During recent years, there has been increasing interest within both the public and private sectors in the use of alternative work schedules. While a sizable body of literature exists on the use of work scheduling variations among private employers, there is a dearth of information concerning the extent and impact of alternative work schedules in…

  13. A Practical Variation of a Multiple-Schedule Procedure: Brief Schedule-Correlated Stimuli

    ERIC Educational Resources Information Center

    Tiger, Jeffrey H.; Hanley, Gregory P.; Larsen, Kylie M.

    2008-01-01

    Multiple schedules using continuous discriminative stimuli have been used to minimize children's disruptive requesting for teacher attention (e.g., colored floral leis; Tiger & Hanley, 2004; Tiger, Hanley, & Heal, 2006). The present study evaluated the effectiveness of, and children's preferences for, two multiple-schedule arrangements in which…

  14. White Paper on studying the safety of the childhood immunization schedule in the Vaccine Safety Datalink.

    PubMed

    Glanz, Jason M; Newcomer, Sophia R; Jackson, Michael L; Omer, Saad B; Bednarczyk, Robert A; Shoup, Jo Ann; DeStefano, Frank; Daley, Matthew F

    2016-02-15

    While the large majority of parents in the U.S. vaccinate their children according to the recommended immunization schedule, some parents have refused or delayed vaccinating, often citing safety concerns. In response to public concern, the U.S. Institute of Medicine (IOM) evaluated existing research regarding the safety of the recommended immunization schedule. The IOM concluded that although available evidence strongly supported the safety of the currently recommended schedule as a whole, additional observational research was warranted to compare health outcomes between fully vaccinated children and those on a delayed or alternative schedule. In addition, the IOM identified the Vaccine Safety Datalink (VSD) as an important resource for conducting this research. Guided by the IOM findings, the Centers for Disease Control and Prevention (CDC) commissioned a White Paper to assess how the VSD could be used to study the safety of the childhood immunization schedule. Guided by subject matter expert engagement, the resulting White Paper outlines a 4 stage approach for identifying exposure groups of undervaccinated children, presents a list of health outcomes of highest priority to examine in this context, and describes various study designs and statistical methods that could be used to analyze the safety of the schedule. While it appears feasible to study the safety of the recommended immunization schedule in settings such as the VSD, these studies will be inherently complex, and as with all observational studies, will need to carefully address issues of confounding and bias. In light of these considerations, decisions about conducting studies of the safety of the schedule will also need to assess epidemiological evidence of potential adverse events that could be related to the schedule, the biological plausibility of an association between an adverse event and the schedule, and public concern about the safety of the schedule. Copyright © 2015 Elsevier Ltd. All rights

  15. Distributed intelligent scheduling of FMS

    NASA Astrophysics Data System (ADS)

    Wu, Zuobao; Cheng, Yaodong; Pan, Xiaohong

    1995-08-01

    In this paper, a distributed scheduling approach of a flexible manufacturing system (FMS) is presented. A new class of Petri nets called networked time Petri nets (NTPN) for system modeling of networking environment is proposed. The distributed intelligent scheduling is implemented by three schedulers which combine NTPN models with expert system techniques. The simulation results are shown.

  16. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  17. FI schedules and persistence at gambling in the U.K. betting office.

    PubMed Central

    Dickerson, M G

    1979-01-01

    This study reports on the direct observations of customers in two U.K. betting offices gambling on horse and dog races. These observations revealed that bets were more frequently placed in the last minutes just prior to the start (the OFF), and that this was caused by high-frequency gamblers (customers who had eight or more bets in a session) consistently placing their bets in the last two minutes prior to the OFF. Low-frequency gamblers (three or fewer bets/session) avoided this time period placing their bets earlier, or after the OFF, i.e., on a later race. It was argued that the betting behavior of the "gamblers" could not be explained either in terms of "skillful betting" or solely in terms of variable ratio schedules but was more adequately accounted for in terms of an interval schedule. It was further suggested that time-based schedules might be of heuristic value in generally understanding persistence at gambling while losing. PMID:511799

  18. Real-time scheduling using minimum search

    NASA Technical Reports Server (NTRS)

    Tadepalli, Prasad; Joshi, Varad

    1992-01-01

    In this paper we consider a simple model of real-time scheduling. We present a real-time scheduling system called RTS which is based on Korf's Minimin algorithm. Experimental results show that the schedule quality initially improves with the amount of look-ahead search and tapers off quickly. So it sppears that reasonably good schedules can be produced with a relatively shallow search.

  19. SMM Observations of Saturn

    NASA Technical Reports Server (NTRS)

    Schnopper, Herbert; Mushotzky, Richard (Technical Monitor)

    2001-01-01

    During the past year I have participated in a series of team telecons to I plan our observation of Saturn with SMM. The observation, scheduled for this month (September), was canceled and a new observation is being planned for 2002.

  20. Systematic Review of the Indirect Effect of Pneumococcal Conjugate Vaccine Dosing Schedules on Pneumococcal Disease and Colonization

    PubMed Central

    2014-01-01

    Background: To aid decision making for pneumococcal conjugate vaccine (PCV) use in infant national immunization programs, we summarized the indirect effects of PCV on clinical outcomes among nontargeted age groups. Methods: We systematically reviewed the English literature on infant PCV dosing schedules published from 1994 to 2010 (with ad hoc addition of 2011 articles) for outcomes on children >5 years of age and adults including vaccine-type nasopharyngeal carriage (VT-NP), vaccine-type invasive pneumococcal disease (VT-IPD) and syndromic pneumonia. Results: Of 12,980 citations reviewed, we identified 21 VT-IPD, 6 VT-NP and 9 pneumonia studies. Of these 36, 21 (58%) included 3 primary doses plus PCV or pneumococcal polysaccharide vaccine (PPV23) booster schedule (3+1 or 3+PPV23), 5 (14%) 3+0, 9 (25%) 2+1 and 1 (3%) 2+0. Most (95%) were PCV7 studies. Among observational VT-IPD studies, all schedules (2+1, 3+0 and 3+1) demonstrated reductions in incidence among young adult groups. Among syndromic pneumonia observational studies (2+1, 3+0 and 3+1), only 3+1 schedules showed significant indirect impact. Of 2 VT-NP controlled trials (3+0 and 3+1) and 3 VT-NP observational studies (2+1, 3+1 and 3+PPV23), 3+1 and 3+PPV23 schedules showed significant indirect effect. The 1 study to directly compare between schedules was a VT-NP study (2+0 vs. 2+1), which found no indirect effect on older siblings and parents of vaccinated children with either schedule. Conclusions: Indirect benefit of a 3+1 infant PCV dosing schedule has been demonstrated for VT-IPD, VT-NP and syndromic pneumonia; 2+1 and 3+0 schedules have demonstrated indirect effect only for VT-IPD. The choice of optimal infant PCV schedule is limited by data paucity on indirect effects, especially a lack of head-to-head studies and studies of PCV10 and PCV13. PMID:24336058

  1. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  2. Conception of Self-Construction Production Scheduling System

    NASA Astrophysics Data System (ADS)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  3. Energy-driven scheduling algorithm for nanosatellite energy harvesting maximization

    NASA Astrophysics Data System (ADS)

    Slongo, L. K.; Martínez, S. V.; Eiterer, B. V. B.; Pereira, T. G.; Bezerra, E. A.; Paiva, K. V.

    2018-06-01

    The number of tasks that a satellite may execute in orbit is strongly related to the amount of energy its Electrical Power System (EPS) is able to harvest and to store. The manner the stored energy is distributed within the satellite has also a great impact on the CubeSat's overall efficiency. Most CubeSat's EPS do not prioritize energy constraints in their formulation. Unlike that, this work proposes an innovative energy-driven scheduling algorithm based on energy harvesting maximization policy. The energy harvesting circuit is mathematically modeled and the solar panel I-V curves are presented for different temperature and irradiance levels. Considering the models and simulations, the scheduling algorithm is designed to keep solar panels working close to their maximum power point by triggering tasks in the appropriate form. Tasks execution affects battery voltage, which is coupled to the solar panels through a protection circuit. A software based Perturb and Observe strategy allows defining the tasks to be triggered. The scheduling algorithm is tested in FloripaSat, which is an 1U CubeSat. A test apparatus is proposed to emulate solar irradiance variation, considering the satellite movement around the Earth. Tests have been conducted to show that the scheduling algorithm improves the CubeSat energy harvesting capability by 4.48% in a three orbit experiment and up to 8.46% in a single orbit cycle in comparison with the CubeSat operating without the scheduling algorithm.

  4. Range Scheduling Aid (RSA)

    NASA Technical Reports Server (NTRS)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  5. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  6. 77 FR 63766 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration 21 CFR Part 1308 [Docket No. DEA-357] Schedules of Controlled Substances: Placement of Methylone Into Schedule I AGENCY: Drug Enforcement Administration, Department of Justice. ACTION: Notice of proposed rulemaking. SUMMARY: The Drug Enforcement...

  7. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  8. User requirements for a patient scheduling system

    NASA Technical Reports Server (NTRS)

    Zimmerman, W.

    1979-01-01

    A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.

  9. A heuristic approach to incremental and reactive scheduling

    NASA Technical Reports Server (NTRS)

    Odubiyi, Jide B.; Zoch, David R.

    1989-01-01

    An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

  10. astroplan: Observation planning package for astronomers

    NASA Astrophysics Data System (ADS)

    Morris, Brett M.; Tollerud, Erik; Sipocz, Brigitta; Deil, Christoph; Douglas, Stephanie T.; Berlanga Medina, Jazmin; Vyhmeister, Karl; Price-Whelan, Adrian M.; Jeschke, Eric

    2018-02-01

    astroplan is a flexible toolbox for observation planning and scheduling. It is powered by Astropy (ascl:1304.002); it works for Python beginners and new observers, and is powerful enough for observatories preparing nightly and long-term schedules as well. It calculates rise/set/meridian transit times, alt/az positions for targets at observatories anywhere on Earth, and offers built-in plotting convenience functions for standard observation planning plots (airmass, parallactic angle, sky maps). It can also determine the observability of sets of targets given an arbitrary set of constraints (i.e., altitude, airmass, moon separation/illumination, etc.).

  11. Scheduling from the perspective of the application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berman, F.; Wolski, R.

    1996-12-31

    Metacomputing is the aggregation of distributed and high-performance resources on coordinated networks. With careful scheduling, resource-intensive applications can be implemented efficiently on metacomputing systems at the sizes of interest to developers and users. In this paper we focus on the problem of scheduling applications on metacomputing systems. We introduce the concept of application-centric scheduling in which everything about the system is evaluated in terms of its impact on the application. Application-centric scheduling is used by virtually all metacomputer programmers to achieve performance on metacomputing systems. We describe two successful metacomputing applications to illustrate this approach, and describe AppLeS scheduling agentsmore » which generalize the application-centric scheduling approach. Finally, we show preliminary results which compare AppLeS-derived schedules with conventional strip and blocked schedules for a two-dimensional Jacobi code.« less

  12. Constraint-Based Scheduling System

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Eskey, Megan; Stock, Todd; Taylor, Will; Kanefsky, Bob; Drascher, Ellen; Deale, Michael; Daun, Brian; Davis, Gene

    1995-01-01

    Report describes continuing development of software for constraint-based scheduling system implemented eventually on massively parallel computer. Based on machine learning as means of improving scheduling. Designed to learn when to change search strategy by analyzing search progress and learning general conditions under which resource bottleneck occurs.

  13. Gain scheduling - Potential hazards and possible remedies

    NASA Technical Reports Server (NTRS)

    Shamma, Jeff S.; Athans, Michael

    1991-01-01

    A common gain scheduling rule-of-thumb is to schedule on a slow variable. In this work, it is shown how current gain scheduling practice is necessarily limited to slow variations in the scheduling variable. These limitations are revealed to be consequences of fundamental control concepts. Furthermore, it is shown how a formulation of the gain scheduling procedure can lead toward ultimately removing these restrictions.

  14. Observing behavior in a computer game.

    PubMed Central

    Case, D A; Ploog, B O; Fantino, E

    1990-01-01

    Contingencies studied in lever-pressing procedures were incorporated into a popular computer game, "Star Trek," played by college students. One putative reinforcer, the opportunity to destroy Klingon invaders, was scheduled independently of responding according to a variable-time schedule that alternated unpredictably with equal periods of Klingon unavailability (mixed variable time, extinction schedule of reinforcement). Two commands ("observing responses") each produced stimuli that were either correlated or uncorrelated with the two components. In several variations of the basic game, an S-, or bad news, was not as reinforcing as an S+, or good news. In addition, in other conditions for the same subjects observing responses were not maintained better by bad news than by an uninformative stimulus. In both choices, more observing tended to be maintained by an S- for response-independent Klingons when its information could be (and was) used to advantage with respect to other types of reinforcement in the situation (Parts 1 and 2) than when the information could not be so used (Part 3). The findings favor the conditioned reinforcement hypothesis of observing behavior over the uncertainty-reduction hypothesis. This extends research to a more natural setting and to multialternative concurrent schedules of events of seemingly intrinsic value. PMID:2103581

  15. Product Use Scheduler: A Scheduling Module used in EPA’s Human Exposure Model

    EPA Science Inventory

    The scheduling model (SM) was developed for scheduling the use of consumer products in the U.S. EPA’s Human Exposure Model (HEM), an integrated modeling system to estimate human exposure to chemicals in household consumer products. The SM begins with year-long daily activit...

  16. Scheduling Software for Complex Scenarios

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Preparing a vehicle and its payload for a single launch is a complex process that involves thousands of operations. Because the equipment and facilities required to carry out these operations are extremely expensive and limited in number, optimal assignment and efficient use are critically important. Overlapping missions that compete for the same resources, ground rules, safety requirements, and the unique needs of processing vehicles and payloads destined for space impose numerous constraints that, when combined, require advanced scheduling. Traditional scheduling systems use simple algorithms and criteria when selecting activities and assigning resources and times to each activity. Schedules generated by these simple decision rules are, however, frequently far from optimal. To resolve mission-critical scheduling issues and predict possible problem areas, NASA historically relied upon expert human schedulers who used their judgment and experience to determine where things should happen, whether they will happen on time, and whether the requested resources are truly necessary.

  17. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  18. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities Exported...

  19. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities Exported...

  20. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    PubMed

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  1. Applying Dynamic Priority Scheduling Scheme to Static Systems of Pinwheel Task Model in Power-Aware Scheduling

    PubMed Central

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10–80% over the existing algorithms. PMID:25121126

  2. Production scheduling with ant colony optimization

    NASA Astrophysics Data System (ADS)

    Chernigovskiy, A. S.; Kapulin, D. V.; Noskova, E. E.; Yamskikh, T. N.; Tsarev, R. Yu

    2017-10-01

    The optimum solution of the production scheduling problem for manufacturing processes at an enterprise is crucial as it allows one to obtain the required amount of production within a specified time frame. Optimum production schedule can be found using a variety of optimization algorithms or scheduling algorithms. Ant colony optimization is one of well-known techniques to solve the global multi-objective optimization problem. In the article, the authors present a solution of the production scheduling problem by means of an ant colony optimization algorithm. A case study of the algorithm efficiency estimated against some others production scheduling algorithms is presented. Advantages of the ant colony optimization algorithm and its beneficial effect on the manufacturing process are provided.

  3. Explanation of Registration Review Schedule

    EPA Pesticide Factsheets

    Updated information on EPA's schedule for opening dockets to begin pesticide registration reviews during the next several years. The schedule is subdivided into conventional pesticides, antimicrobials, biochemicals, and microbials.

  4. Alternative Work Schedules: Definitions

    ERIC Educational Resources Information Center

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  5. 40 CFR 52.1425 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1425 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1425 Compliance schedules. (a) The compliance schedules for the sources identified below are approved as revisions to the plan...

  6. Scheduling Real-Time Mixed-Criticality Jobs

    NASA Astrophysics Data System (ADS)

    Baruah, Sanjoy K.; Bonifaci, Vincenzo; D'Angelo, Gianlorenzo; Li, Haohan; Marchetti-Spaccamela, Alberto; Megow, Nicole; Stougie, Leen

    Many safety-critical embedded systems are subject to certification requirements; some systems may be required to meet multiple sets of certification requirements, from different certification authorities. Certification requirements in such "mixed-criticality" systems give rise to interesting scheduling problems, that cannot be satisfactorily addressed using techniques from conventional scheduling theory. In this paper, we study a formal model for representing such mixed-criticality workloads. We demonstrate first the intractability of determining whether a system specified in this model can be scheduled to meet all its certification requirements, even for systems subject to two sets of certification requirements. Then we quantify, via the metric of processor speedup factor, the effectiveness of two techniques, reservation-based scheduling and priority-based scheduling, that are widely used in scheduling such mixed-criticality systems, showing that the latter of the two is superior to the former. We also show that the speedup factors are tight for these two techniques.

  7. A space station onboard scheduling assistant

    NASA Technical Reports Server (NTRS)

    Brindle, A. F.; Anderson, B. H.

    1988-01-01

    One of the goals for the Space Station is to achieve greater autonomy, and have less reliance on ground commanding than previous space missions. This means that the crew will have to take an active role in scheduling and rescheduling their activities onboard, perhaps working from preliminary schedules generated on the ground. Scheduling is a time intensive task, whether performed manually or automatically, so the best approach to solving onboard scheduling problems may involve crew members working with an interactive software scheduling package. A project is described which investigates a system that uses knowledge based techniques for the rescheduling of experiments within the Materials Technology Laboratory of the Space Station. Particular attention is paid to: (1) methods for rapid response rescheduling to accommodate unplanned changes in resource availability, (2) the nature of the interface to the crew, (3) the representation of the many types of data within the knowledge base, and (4) the possibility of applying rule-based and constraint-based reasoning methods to onboard activity scheduling.

  8. Development of Watch Schedule Using Rules Approach

    NASA Astrophysics Data System (ADS)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  9. Brief Report: Relationship Between ADOS-2, Module 4 Calibrated Severity Scores (CSS) and Social and Non-Social Standardized Assessment Measures in Adult Males with Autism Spectrum Disorder (ASD).

    PubMed

    Morrier, Michael J; Ousley, Opal Y; Caceres-Gamundi, Gabriella A; Segall, Matthew J; Cubells, Joseph F; Young, Larry J; Andari, Elissar

    2017-12-01

    The ADOS-2 Modules 1-3 now include a standardized calibrated severity score (CSS) from 1 to 10 based on the overall total raw score. Subsequent research published CSS for Module 4 (Hus, Lord, Journal of Autism and Developmental Disorders 44(8):1996-2012, 2014); however more research is needed to examine the psychometric properties of this CSS. Forty males with ASD completed an assessment battery consisting of ADOS-2 Module 4 and other clinical measures assessing core ASD symptomology and comorbidity. Pearson correlation analyses found that CSS did not correlate with measures that assessed core social deficits of ASD or general psychiatric co-morbidity, but CSS did correlate negatively with intellectual quotient. These findings provide information on the limitations and relevance of CSS to be taken into account in future clinical evaluations of ASD.

  10. Technology for planning and scheduling under complex constraints

    NASA Astrophysics Data System (ADS)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  11. Registration Review Docket Opening Schedule

    EPA Pesticide Factsheets

    Dockets are opened on a fiscal year schedule for reevaluation of all pesticides. They are subdivided into conventional pesticides, antimicrobials, biochemicals, and microbials. The schedules for 2014 to 2017 are attached.

  12. Enhanced Software for Scheduling Space-Shuttle Processing

    NASA Technical Reports Server (NTRS)

    Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.; hide

    2004-01-01

    The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

  13. 12 CFR 229.12 - Availability schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Availability schedule. 229.12 Section 229.12 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM... Availability Policies § 229.12 Availability schedule. (a) Effective date. The availability schedule contained...

  14. 40 CFR 52.1335 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1335 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Missouri § 52.1335 Compliance schedules. (a) The compliance schedule for the source identified below is approved as a revision to the plan pursuant...

  15. Binary Trees and Parallel Scheduling Algorithms.

    DTIC Science & Technology

    1980-09-01

    been pro- cessed for p. time units. If a job does not complete by its due time, it is tardy. In a nonpreemptive schedule, job i is scheduled to process...the preemptive schedule obtained by the algorithm of section 2.1.2 also minimizes 5Ti, this problem is easily solved in parallel. When lci is to e...August 1978, pp. 657-661. 14. Horn, W. A., "Some simple scheduling algorithms," Naval Res. Logist . Qur., Vol. 21, pp. 177-185, 1974. i5. Hforowitz, E

  16. Trimester Schedule. Research Brief

    ERIC Educational Resources Information Center

    Education Partnerships, Inc., 2012

    2012-01-01

    Why do a trimester schedule? With the advent of block scheduling, many high schools conducted research on utilizing that plan in a trimester format. There appeared to be three issues that most schools faced: (1) How to provide substantive instructional time that was not fragmented?; (2) How does the school climate contribute positively to…

  17. 19 CFR 162.45a - Summary forfeiture of Schedule I and Schedule II controlled substances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE....S.C. 965. Accordingly, in the case of a seizure of Schedule I or Schedule II controlled substances...

  18. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Sampling schedules. 141.702 Section... Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring under § 141.701 must submit a sampling schedule that specifies the calendar dates when the system will...

  19. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Sampling schedules. 141.702 Section... Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring under § 141.701 must submit a sampling schedule that specifies the calendar dates when the system will...

  20. Scheduling lessons learned from the Autonomous Power System

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  1. The schedule effect: can recurrent peak infections be reduced without vaccines, quarantines or school closings?

    PubMed

    Diedrichs, Danilo R; Isihara, Paul A; Buursma, Doeke D

    2014-02-01

    Using a basic, two transmission level seasonal SIR model, we introduce mathematical evidence for the schedule effect which asserts that major recurring peak infections can be significantly reduced by modification of the traditional school calendar. The schedule effect is observed first in simulated time histories of the infectious population. Schedules with higher average transmission rate may exhibit reduced peak infections. Splitting vacations changes the period of the oscillating transmission function and can confine limit cycles in the proportion susceptible/proportion infected phase plane. Numerical analysis of the phase plane shows the relationship between the transmission period and the maximum recurring infection peaks and period of the response. For certain transmission periods, this response may exhibit period-doubling and chaos, leading to increased peaks. Non-monotonic infectious response is also observed in conjunction with changing birth rate. We discuss how to take these effects into consideration to design an optimum school schedule with particular reference to a hypothetical developing world context. Copyright © 2013 Elsevier Inc. All rights reserved.

  2. Incremental Scheduling Engines: Cost Savings through Automation

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  3. A new task scheduling algorithm based on value and time for cloud platform

    NASA Astrophysics Data System (ADS)

    Kuang, Ling; Zhang, Lichen

    2017-08-01

    Tasks scheduling, a key part of increasing resource utilization and enhancing system performance, is a never outdated problem especially in cloud platforms. Based on the value density algorithm of the real-time task scheduling system and the character of the distributed system, the paper present a new task scheduling algorithm by further studying the cloud technology and the real-time system: Least Level Value Density First (LLVDF). The algorithm not only introduces some attributes of time and value for tasks, it also can describe weighting relationships between these properties mathematically. As this feature of the algorithm, it can gain some advantages to distinguish between different tasks more dynamically and more reasonably. When the scheme was used in the priority calculation of the dynamic task scheduling on cloud platform, relying on its advantage, it can schedule and distinguish tasks with large amounts and many kinds more efficiently. The paper designs some experiments, some distributed server simulation models based on M/M/C model of queuing theory and negative arrivals, to compare the algorithm against traditional algorithm to observe and show its characters and advantages.

  4. Tool for Merging Proposals Into DSN Schedules

    NASA Technical Reports Server (NTRS)

    Khanampornpan, Teerapat; Kwok, John; Call, Jared

    2008-01-01

    A Practical Extraction and Reporting Language (Perl) script called merge7da has been developed to facilitate determination, by a project scheduler in NASA's Deep Space Network, of whether a proposal for use of the DSN could create a conflict with the current DSN schedule. Prior to the development of merge7da, there was no way to quickly identify potential schedule conflicts: it was necessary to submit a proposal and wait a day or two for a response from a DSN scheduling facility. By using merge7da to detect and eliminate potential schedule conflicts before submitting a proposal, a project scheduler saves time and gains assurance that the proposal will probably be accepted. merge7da accepts two input files, one of which contains the current DSN schedule and is in a DSN-standard format called '7da'. The other input file contains the proposal and is in another DSN-standard format called 'C1/C2'. merge7da processes the two input files to produce a merged 7da-format output file that represents the DSN schedule as it would be if the proposal were to be adopted. This 7da output file can be loaded into various DSN scheduling software tools now in use.

  5. Response Strength in Extreme Multiple Schedules

    ERIC Educational Resources Information Center

    McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…

  6. Observing strategies for future solar facilities: the ATST test case

    NASA Astrophysics Data System (ADS)

    Uitenbroek, H.; Tritschler, A.

    2012-12-01

    Traditionally solar observations have been scheduled and performed very differently from night time efforts, in particular because we have been observing the Sun for a long time, requiring new combinations of observables to make progress, and because solar physics observations are often event driven on time scales of hours to days. With the proposal pressure that is expected for new large-aperture facilities, we can no longer afford the time spent on custom setups, and will have to rethink our scheduling and operations. We will discuss our efforts at Sac Peak in preparing for this new era, and outline the planned scheduling and operations planning for the ATST in particular.

  7. An Expert System for Aviation Squadron Flight Scheduling

    DTIC Science & Technology

    1991-09-01

    SCHEDULING A. OVERVIEW A flight schedule is an organization’s plan to accomplish specific missions with its available resources. It details the mission...schedule for every 24 hour period, and will occasionally write a weekly flight schedule for long range planning purposes. The flight schedule is approved...requirements, and 11 aircraft, trainer, and aircrew availability to formulate the flight schedule. It basically is a plan to optimize the squadron’s resources

  8. A Web-Remote/Robotic/Scheduled Astronomical Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Denny, Robert

    2011-03-01

    Traditionally, remote/robotic observatory operating systems have been custom made for each observatory. While data reduction pipelines need to be tailored for each investigation, the data acquisition process (especially for stare-mode optical images) is often quite similar across investigations. Since 1999, DC-3 Dreams has focused on providing and supporting a remote/robotic observatory operating system which can be adapted to a wide variety of physical hardware and optics while achieving the highest practical observing efficiency and safe/secure web browser user controls. ACP Expert consists of three main subsystems: (1) a robotic list-driven data acquisition engine which controls all aspects of the observatory, (2) a constraint-driven dispatch scheduler with a long-term database of requests, and (3) a built-in "zero admin" web server and dynamic web pages which provide a remote capability for immediate execution and monitoring as well as entry and monitoring of dispatch-scheduled observing requests. No remote desktop login is necessary for observing, thus keeping the system safe and consistent. All routine operation is via the web browser. A wide variety of telescope mounts, CCD imagers, guiding sensors, filter selectors, focusers, instrument-package rotators, weather sensors, and dome control systems are supported via the ASCOM standardized device driver architecture. The system is most commonly employed on commercial 1-meter and smaller observatories used by universities and advanced amateurs for both science and art. One current project, the AAVSO Photometric All-Sky Survey (APASS), uses ACP Expert to acquire large volumes of data in dispatch-scheduled mode. In its first 18 months of operation (North then South), 40,307 sky images were acquired in 117 photometric nights, resulting in 12,107,135 stars detected two or more times. These stars had measures in 5 filters. The northern station covered 754 fields (6446 square degrees) at least twice, the southern

  9. Social Phenotypes of Autism Spectrum Disorders and Williams Syndrome: Similarities and Differences

    PubMed Central

    Asada, Kosuke; Itakura, Shoji

    2012-01-01

    Autism spectrum disorders (ASD) and Williams syndrome (WS) both are neurodevelopmental disorders, each with a unique social phenotypic pattern. This review article aims to define the similarities and differences between the social phenotypes of ASD and WS. We review studies that have examined individuals with WS using diagnostic assessments such as the Autism Diagnostic Observation Schedule (ADOS), cross-syndrome direct comparison studies, and studies that have individually examined either disorder. We conclude that (1) individuals with these disorders show quite contrasting phenotypes for face processing (i.e., preference to faces and eyes) and sociability (i.e., interest in and motivation to interact with others), and (2) although the ADOS and a direct comparison study on pragmatic language ability suggest more deficits in ASD, individuals with WS are similarly impaired on social cognition and communicative skills. In light of these results, we discuss how cross-syndrome comparisons between ASD and WS can contribute to developmental theory, cognitive neuroscience, and the development and choice of clinical treatments. PMID:22866045

  10. Scheduling Algorithm for the Large Synoptic Survey Telescope

    NASA Astrophysics Data System (ADS)

    Ichharam, Jaimal; Stubbs, Christopher

    2015-01-01

    The Large Synoptic Survey Telescope (LSST) is a wide-field telescope currently under construction and scheduled to be deployed in Chile by 2022 and operate for a ten-year survey. As a ground-based telescope with the largest etendue ever constructed, and the ability to take images approximately once every eighteen seconds, the LSST will be able to capture the entirety of the observable sky every few nights in six different band passes. With these remarkable features, LSST is primed to provide the scientific community with invaluable data in numerous areas of astronomy, including the observation of near-Earth asteroids, the detection of transient optical events such as supernovae, and the study of dark matter and energy through weak gravitational lensing.In order to maximize the utility that LSST will provide toward achieving these scientific objectives, it proves necessary to develop a flexible scheduling algorithm for the telescope which both optimizes its observational efficiency and allows for adjustment based on the evolving needs of the astronomical community.This work defines a merit function that incorporates the urgency of observing a particular field in the sky as a function of time elapsed since last observed, dynamic viewing conditions (in particular transparency and sky brightness), and a measure of scientific interest in the field. The problem of maximizing this merit function, summed across the entire observable sky, is then reduced to a classic variant of the dynamic traveling salesman problem. We introduce a new approximation technique that appears particularly well suited for this situation. We analyze its effectiveness in resolving this problem, obtaining some promising initial results.

  11. Transit scheduling: Basic and advanced manuals. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pine, R.; Niemeyer, J.; Chisholm, R.

    1998-12-01

    This manual will be of interest to new transit schedulers, experienced schedulers, transit planners, operating staff, and others who need to be conversant with the scheduling process. The materials clearly describe all steps in the bus and light rail scheduling process, under TCRP Project A-11, Transit Scheduling: A Manual with Materials, research was undertaken by Transportation Management and Design of Solana Beach, California, to prepare a transit scheduling manual that incorporates modern training techniques for bus and light rail transit scheduling. The manual consists of two sections: a basic treatment and an advanced section. The basic-level section is in anmore » instructional format designed primarily for novice schedulers and other transit staff. The advance section covers more complex scheduling requirements. Each section may be used sequentially or independently and is designed to integrate with agency apprenticeship and on-the-job training.« less

  12. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  13. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  14. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  15. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  16. 5 CFR 532.261 - Special wage schedules for leader and supervisory schedules for leader and supervisory wage...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... supervisory schedules for leader and supervisory wage employees in the Puerto Rico wage area. 532.261 Section... schedules for leader and supervisory wage employees in the Puerto Rico wage area. (a) The Department of... the Puerto Rico wage area. (c) The step 2 rate for the supervisory wage schedule shall be: (1) For...

  17. The Added Value of the Combined Use of the Autism Diagnostic Interview-Revised and the Autism Diagnostic Observation Schedule: Diagnostic Validity in a Clinical Swedish Sample of Toddlers and Young Preschoolers

    ERIC Educational Resources Information Center

    Zander, Eric; Sturm, Harald; Bölte, Sven

    2015-01-01

    The diagnostic validity of the new research algorithms of the Autism Diagnostic Interview-Revised and the revised algorithms of the Autism Diagnostic Observation Schedule was examined in a clinical sample of children aged 18-47 months. Validity was determined for each instrument separately and their combination against a clinical consensus…

  18. Evaluating Sex and Age Differences in ADI-R and ADOS Scores in a Large European Multi-Site Sample of Individuals with Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Tillmann, J.; Ashwood, K.; Absoud, M.; Bölte, S.; Bonnet-Brilhault, F.; Buitelaar, J. K.; Calderoni, S.; Calvo, R.; Canal-Bedia, R.; Canitano, R.; De Bildt, A.; Gomot, M.; Hoekstra, P. J.; Kaale, A.; McConachie, H.; Murphy, D. G.; Narzisi, A.; Oosterling, I.; Pejovic-Milovancevic, M.; Persico, A. M.; Puig, O.; Roeyers, H.; Rommelse, N.; Sacco, R.; Scandurra, V.; Stanfield, A. C.; Zander, E.; Charman, T.

    2018-01-01

    Research on sex-related differences in Autism Spectrum Disorder (ASD) has been impeded by small samples. We pooled 28 datasets from 18 sites across nine European countries to examine sex differences in the ASD phenotype on the ADI-R (376 females, 1763 males) and ADOS (233 females, 1187 males). On the ADI-R, early childhood restricted and…

  19. Hard real-time beam scheduler enables adaptive images in multi-probe systems

    NASA Astrophysics Data System (ADS)

    Tobias, Richard J.

    2014-03-01

    Real-time embedded-system concepts were adapted to allow an imaging system to responsively control the firing of multiple probes. Large-volume, operator-independent (LVOI) imaging would increase the diagnostic utility of ultrasound. An obstacle to this innovation is the inability of current systems to drive multiple transducers dynamically. Commercial systems schedule scanning with static lists of beams to be fired and processed; here we allow an imager to adapt to changing beam schedule demands, as an intelligent response to incoming image data. An example of scheduling changes is demonstrated with a flexible duplex mode two-transducer application mimicking LVOI imaging. Embedded-system concepts allow an imager to responsively control the firing of multiple probes. Operating systems use powerful dynamic scheduling algorithms, such as fixed priority preemptive scheduling. Even real-time operating systems lack the timing constraints required for ultrasound. Particularly for Doppler modes, events must be scheduled with sub-nanosecond precision, and acquired data is useless without this requirement. A successful scheduler needs unique characteristics. To get close to what would be needed in LVOI imaging, we show two transducers scanning different parts of a subjects leg. When one transducer notices flow in a region where their scans overlap, the system reschedules the other transducer to start flow mode and alter its beams to get a view of the observed vessel and produce a flow measurement. The second transducer does this in a focused region only. This demonstrates key attributes of a successful LVOI system, such as robustness against obstructions and adaptive self-correction.

  20. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  1. Signals, resistance to change, and conditioned reinforcement in a multiple schedule.

    PubMed

    Bell, Matthew C; Gomez, Belen E; Kessler, Kira

    2008-06-01

    The effect of signals on resistance to change was evaluated using pigeons responding on a three-component multiple schedule. Each component contained a variable-interval initial link followed by a fixed-time terminal link. One component was an unsignaled-delay schedule, and two were equivalent signaled-delay schedules. After baseline training, resistance to change was assessed through (a) extinction and (b) adding free food to the intercomponent interval. During these tests, the signal stimulus from one of the signaled-delay components (SIG-T) was replaced with the initial-link stimulus from that component, converting it to an unsignaled-delay schedule. That signal stimulus was added to the delay period of the unsignaled-delay component (UNS), converting it to a signaled-delay schedule. The remaining signaled component remained unchanged (SIG-C). Resistance-to-change tests showed removing the signal had a minimal effect on resistance to change in the SIG-T component compared to the unchanged SIG-C component except for one block during free-food testing. Adding the signal to the UNS component significantly increased response rates suggesting that component had low response strength. Interestingly, the direction of the effect was in the opposite direction from what is typically observed. Results are consistent with the conclusion that the signal functioned as a conditioned reinforcer and inconsistent with a generalization-decrement explanation.

  2. 24 CFR 982.517 - Utility allowance schedule.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... percent or more in the utility rate since the last time the utility allowance schedule was revised. The... allowance schedule to correct any errors, or as necessary to update the schedule. (d) Use of utility...

  3. 24 CFR 982.517 - Utility allowance schedule.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... percent or more in the utility rate since the last time the utility allowance schedule was revised. The... allowance schedule to correct any errors, or as necessary to update the schedule. (d) Use of utility...

  4. 24 CFR 982.517 - Utility allowance schedule.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... percent or more in the utility rate since the last time the utility allowance schedule was revised. The... allowance schedule to correct any errors, or as necessary to update the schedule. (d) Use of utility...

  5. Modeling the Violation of Reward Maximization and Invariance in Reinforcement Schedules

    PubMed Central

    La Camera, Giancarlo; Richmond, Barry J.

    2008-01-01

    It is often assumed that animals and people adjust their behavior to maximize reward acquisition. In visually cued reinforcement schedules, monkeys make errors in trials that are not immediately rewarded, despite having to repeat error trials. Here we show that error rates are typically smaller in trials equally distant from reward but belonging to longer schedules (referred to as “schedule length effect”). This violates the principles of reward maximization and invariance and cannot be predicted by the standard methods of Reinforcement Learning, such as the method of temporal differences. We develop a heuristic model that accounts for all of the properties of the behavior in the reinforcement schedule task but whose predictions are not different from those of the standard temporal difference model in choice tasks. In the modification of temporal difference learning introduced here, the effect of schedule length emerges spontaneously from the sensitivity to the immediately preceding trial. We also introduce a policy for general Markov Decision Processes, where the decision made at each node is conditioned on the motivation to perform an instrumental action, and show that the application of our model to the reinforcement schedule task and the choice task are special cases of this general theoretical framework. Within this framework, Reinforcement Learning can approach contextual learning with the mixture of empirical findings and principled assumptions that seem to coexist in the best descriptions of animal behavior. As examples, we discuss two phenomena observed in humans that often derive from the violation of the principle of invariance: “framing,” wherein equivalent options are treated differently depending on the context in which they are presented, and the “sunk cost” effect, the greater tendency to continue an endeavor once an investment in money, effort, or time has been made. The schedule length effect might be a manifestation of these phenomena

  6. Modeling the violation of reward maximization and invariance in reinforcement schedules.

    PubMed

    La Camera, Giancarlo; Richmond, Barry J

    2008-08-08

    It is often assumed that animals and people adjust their behavior to maximize reward acquisition. In visually cued reinforcement schedules, monkeys make errors in trials that are not immediately rewarded, despite having to repeat error trials. Here we show that error rates are typically smaller in trials equally distant from reward but belonging to longer schedules (referred to as "schedule length effect"). This violates the principles of reward maximization and invariance and cannot be predicted by the standard methods of Reinforcement Learning, such as the method of temporal differences. We develop a heuristic model that accounts for all of the properties of the behavior in the reinforcement schedule task but whose predictions are not different from those of the standard temporal difference model in choice tasks. In the modification of temporal difference learning introduced here, the effect of schedule length emerges spontaneously from the sensitivity to the immediately preceding trial. We also introduce a policy for general Markov Decision Processes, where the decision made at each node is conditioned on the motivation to perform an instrumental action, and show that the application of our model to the reinforcement schedule task and the choice task are special cases of this general theoretical framework. Within this framework, Reinforcement Learning can approach contextual learning with the mixture of empirical findings and principled assumptions that seem to coexist in the best descriptions of animal behavior. As examples, we discuss two phenomena observed in humans that often derive from the violation of the principle of invariance: "framing," wherein equivalent options are treated differently depending on the context in which they are presented, and the "sunk cost" effect, the greater tendency to continue an endeavor once an investment in money, effort, or time has been made. The schedule length effect might be a manifestation of these phenomena in monkeys.

  7. Requirements for the implementation of schedule repair technology in the Experiment Scheduling Program

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1992-01-01

    The following list of requirements specifies the proposed revisions to the Experiment Scheduling Program (ESP2) which deal with schedule repair. These requirements are divided into those which are general in nature, those which relate to measurement and analysis functions of the software, those which relate specifically to conflict resolution, and those relating directly to the user interface. (This list is not a complete list of requirements for the user interface, but only a list of those schedule repair requirements which relate to the interface.) Some of the requirements relate only to uses of the software in real-time operations. Others are clearly for future versions of the software, beyond the upcoming revision. In either case, the fact will be clearly stated.

  8. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    NASA Astrophysics Data System (ADS)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  9. The Autism Diagnostic Observation Schedule, Module 4: Application of the Revised Algorithms in an Independent, Well-Defined, Dutch Sample (n = 93).

    PubMed

    de Bildt, Annelies; Sytema, Sjoerd; Meffert, Harma; Bastiaansen, Jojanneke A C J

    2016-01-01

    This study examined the discriminative ability of the revised Autism Diagnostic Observation Schedule module 4 algorithm (Hus and Lord in J Autism Dev Disord 44(8):1996-2012, 2014) in 93 Dutch males with Autism Spectrum Disorder (ASD), schizophrenia, psychopathy or controls. Discriminative ability of the revised algorithm ASD cut-off resembled the original algorithm ASD cut-off: highly specific for psychopathy and controls, lower sensitivity than Hus and Lord (2014; i.e. ASD .61, AD .53). The revised algorithm AD cut-off improved sensitivity over the original algorithm. Discriminating ASD from schizophrenia was still challenging, but the better-balanced sensitivity (.53) and specificity (.78) of the revised algorithm AD cut-off may aide clinicians' differential diagnosis. Findings support using the revised algorithm, being conceptually conform the other modules, thus improving comparability across the lifespan.

  10. OGUPSA sensor scheduling architecture and algorithm

    NASA Astrophysics Data System (ADS)

    Zhang, Zhixiong; Hintz, Kenneth J.

    1996-06-01

    This paper introduces a new architecture for a sensor measurement scheduler as well as a dynamic sensor scheduling algorithm called the on-line, greedy, urgency-driven, preemptive scheduling algorithm (OGUPSA). OGUPSA incorporates a preemptive mechanism which uses three policies, (1) most-urgent-first (MUF), (2) earliest- completed-first (ECF), and (3) least-versatile-first (LVF). The three policies are used successively to dynamically allocate and schedule and distribute a set of arriving tasks among a set of sensors. OGUPSA also can detect the failure of a task to meet a deadline as well as generate an optimal schedule in the sense of minimum makespan for a group of tasks with the same priorities. A side benefit is OGUPSA's ability to improve dynamic load balance among all sensors while being a polynomial time algorithm. Results of a simulation are presented for a simple sensor system.

  11. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, there are many reasons why the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  12. Job shop scheduling problem with late work criterion

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  13. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  14. Resource planning and scheduling of payload for satellite with particle swarm optimization

    NASA Astrophysics Data System (ADS)

    Li, Jian; Wang, Cheng

    2007-11-01

    The resource planning and scheduling technology of payload is a key technology to realize an automated control for earth observing satellite with limited resources on satellite, which is implemented to arrange the works states of various payloads to carry out missions by optimizing the scheme of the resources. The scheduling task is a difficult constraint optimization problem with various and mutative requests and constraints. Based on the analysis of the satellite's functions and the payload's resource constraints, a proactive planning and scheduling strategy based on the availability of consumable and replenishable resources in time-order is introduced along with dividing the planning and scheduling period to several pieces. A particle swarm optimization algorithm is proposed to address the problem with an adaptive mutation operator selection, where the swarm is divided into groups with different probabilities to employ various mutation operators viz., differential evolution, Gaussian and random mutation operators. The probabilities are adjusted adaptively by comparing the effectiveness of the groups to select a proper operator. The simulation results have shown the feasibility and effectiveness of the method.

  15. Schedules of Controlled Substances: Extension of Temporary Placement of Three Synthetic Phenethylamines in Schedule I. Final order.

    PubMed

    2015-11-13

    The Administrator of the Drug Enforcement Administration is issuing this final order extending the temporary schedule I status for three synthetic phenethylamines into the Controlled Substances Act pursuant to the temporary scheduling provisions of the Act. The substances are: 2-(4-iodo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25I-NBOMe; 2C-I-NBOMe; 25I; Cimbi-5), 2-(4-chloro-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25C-NBOMe; 2C-C-NBOMe; 25C; Cimbi-82), and 2-(4-bromo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25B-NBOMe; 2C-B-NBOMe; 25B; Cimbi-36) [hereinafter 25I-NBOMe, 2C-NBOMe, and 25-NBOMe, respectively]. The initial temporary scheduling was based on a finding by the Deputy Administrator that the placement of these synthetic phenethylamines and their optical, positional, and geometric isomers, salts, and salts of isomers into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. The current final order temporarily placing 25I-NBOMe, 25C-NBOMe, and 25B-NBOMe in schedule I is due to expire on November 14, 2015. This final order will extend the temporary scheduling of 25I-NBOMe, 25C-NBOMe, and 25B-NBOMe for one year, or until the permanent scheduling action for these three substances is completed, whichever occurs first. As a result of this order, the full effect of the Controlled Substances Act and its implementing regulations, including criminal, civil and administrative penalties, sanctions, and regulatory controls of schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic phenethylamines.

  16. Biparental incubation-scheduling: no experimental evidence for major energetic constraints

    PubMed Central

    Cresswell, Will; Rutten, Anne L.; Valcu, Mihai; Kempenaers, Bart

    2015-01-01

    Incubation is energetically demanding, but it is debated whether these demands constrain incubation-scheduling (i.e., the length, constancy, and timing of incubation bouts) in cases where both parents incubate. Using 2 methods, we experimentally reduced the energetic demands of incubation in the semipalmated sandpiper, a biparental shorebird breeding in the harsh conditions of the high Arctic. First, we decreased the demands of incubation for 1 parent only by exchanging 1 of the 4 eggs for an artificial egg that heated up when the focal bird incubated. Second, we reanalyzed the data from the only published experimental study that has explicitly tested energetic constraints on incubation-scheduling in a biparentally incubating species (Cresswell et al. 2003). In this experiment, the energetic demands of incubation were decreased for both parents by insulating the nest cup. We expected that the treated birds, in both experiments, would change the length of their incubation bouts, if biparental incubation-scheduling is energetically constrained. However, we found no evidence that heating or insulation of the nest affected the length of incubation bouts: the combined effect of both experiments was an increase in bout length of 3.6min (95% CI: −33 to 40), which is equivalent to a 0.5% increase in the length of the average incubation bout. These results demonstrate that the observed biparental incubation-scheduling in semipalmated sandpipers is not primarily driven by energetic constraints and therefore by the state of the incubating bird, implying that we still do not understand the factors driving biparental incubation-scheduling. PMID:25713473

  17. Biparental incubation-scheduling: no experimental evidence for major energetic constraints.

    PubMed

    Bulla, Martin; Cresswell, Will; Rutten, Anne L; Valcu, Mihai; Kempenaers, Bart

    2015-01-01

    Incubation is energetically demanding, but it is debated whether these demands constrain incubation-scheduling (i.e., the length, constancy, and timing of incubation bouts) in cases where both parents incubate. Using 2 methods, we experimentally reduced the energetic demands of incubation in the semipalmated sandpiper, a biparental shorebird breeding in the harsh conditions of the high Arctic. First, we decreased the demands of incubation for 1 parent only by exchanging 1 of the 4 eggs for an artificial egg that heated up when the focal bird incubated. Second, we reanalyzed the data from the only published experimental study that has explicitly tested energetic constraints on incubation-scheduling in a biparentally incubating species (Cresswell et al. 2003). In this experiment, the energetic demands of incubation were decreased for both parents by insulating the nest cup. We expected that the treated birds, in both experiments, would change the length of their incubation bouts, if biparental incubation-scheduling is energetically constrained. However, we found no evidence that heating or insulation of the nest affected the length of incubation bouts: the combined effect of both experiments was an increase in bout length of 3.6min (95% CI: -33 to 40), which is equivalent to a 0.5% increase in the length of the average incubation bout. These results demonstrate that the observed biparental incubation-scheduling in semipalmated sandpipers is not primarily driven by energetic constraints and therefore by the state of the incubating bird, implying that we still do not understand the factors driving biparental incubation-scheduling.

  18. 39 CFR 3020.11 - Initial Mail Classification Schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Initial Mail Classification Schedule. 3020.11 Section 3020.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule § 3020.11 Initial Mail Classification Schedule. The initial Mail Classification Schedule shall...

  19. Enabling a New Planning and Scheduling Paradigm

    NASA Technical Reports Server (NTRS)

    Jaap, John; Davis, Elizabeth

    2004-01-01

    The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models

  20. A COTS-Based Attitude Dependent Contact Scheduling System

    NASA Technical Reports Server (NTRS)

    DeGumbia, Jonathan D.; Stezelberger, Shane T.; Woodard, Mark

    2006-01-01

    The mission architecture of the Gamma-ray Large Area Space Telescope (GLAST) requires a sophisticated ground system component for scheduling the downlink of science data. Contacts between the ````````````````` satellite and the Tracking and Data Relay Satellite System (TDRSS) are restricted by the limited field-of-view of the science data downlink antenna. In addition, contacts must be scheduled when permitted by the satellite s complex and non-repeating attitude profile. Complicating the matter further, the long lead-time required to schedule TDRSS services, combined with the short duration of the downlink contact opportunities, mandates accurate GLAST orbit and attitude modeling. These circumstances require the development of a scheduling system that is capable of predictively and accurately modeling not only the orbital position of GLAST but also its attitude. This paper details the methods used in the design of a Commercial Off The Shelf (COTS)-based attitude-dependent. TDRSS contact Scheduling system that meets the unique scheduling requirements of the GLAST mission, and it suggests a COTS-based scheduling approach to support future missions. The scheduling system applies filtering and smoothing algorithms to telemetered GPS data to produce high-accuracy predictive GLAST orbit ephemerides. Next, bus pointing commands from the GLAST Science Support Center are used to model the complexities of the two dynamic science gathering attitude modes. Attitude-dependent view periods are then generated between GLAST and each of the supporting TDRSs. Numerous scheduling constraints are then applied to account for various mission specific resource limitations. Next, an optimization engine is used to produce an optimized TDRSS contact schedule request which is sent to TDRSS scheduling for confirmation. Lastly, the confirmed TDRSS contact schedule is rectified with an updated ephemeris and adjusted bus pointing commands to produce a final science downlink contact schedule.

  1. Scheduling nursing personnel on a microcomputer.

    PubMed

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  2. A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

    NASA Technical Reports Server (NTRS)

    Potter, William; Gasch, John; Bauer, Cynthia

    1998-01-01

    Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule

  3. Vehicle and driver scheduling for public transit.

    DOT National Transportation Integrated Search

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  4. A hybrid job-shop scheduling system

    NASA Technical Reports Server (NTRS)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  5. Scheduling Dependent Real-Time Activities

    DTIC Science & Technology

    1990-08-01

    dependency relationships in a way that is suitable for all real - time systems . This thesis provides an algorithm, called DASA, that is effective for...scheduling the class of real - time systems known as supervisory control systems. Simulation experiments that account for the time required to make scheduling

  6. Space station payload operations scheduling with ESP2

    NASA Technical Reports Server (NTRS)

    Stacy, Kenneth L.; Jaap, John P.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

  7. Schedule of controlled substances; placement of fospropofol into schedule IV. Final rule.

    PubMed

    2009-10-06

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance fospropofol, including its salts, isomers and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, into schedule IV of the Controlled Substances Act (CSA). As a result of this rule, the regulatory controls and criminal sanctions of schedule IV will be applicable to the manufacture, distribution, dispensing, importation, and exportation of fospropofol and products containing fospropofol.

  8. A customizable, scalable scheduling and reporting system.

    PubMed

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  9. Cure Schedule for Stycast 2651/Catalyst 9.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kropka, Jamie Michael; McCoy, John D.

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds amore » “post cure” to obtain full reaction.« less

  10. Balancing Authority Cooperation Concepts - Intra-Hour Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunsaker, Matthew; Samaan, Nader; Milligan, Michael

    2013-03-29

    The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similarmore » and/or unchanged among the scenarios.« less

  11. Developing optimal nurses work schedule using integer programming

    NASA Astrophysics Data System (ADS)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  12. 77 FR 41258 - FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  13. 76 FR 43819 - FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  14. Prescribed Travel Schedules for Fatigue Management

    NASA Technical Reports Server (NTRS)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  15. Utilizing AI in Temporal, Spatial, and Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Stottler, Richard; Kalton, Annaka; Bell, Aaron

    2006-01-01

    Aurora is a software system enabling the rapid, easy solution of complex scheduling problems involving spatial and temporal constraints among operations and scarce resources (such as equipment, workspace, and human experts). Although developed for use in the International Space Station Processing Facility, Aurora is flexible enough that it can be easily customized for application to other scheduling domains and adapted as the requirements change or become more precisely known over time. Aurora s scheduling module utilizes artificial-intelligence (AI) techniques to make scheduling decisions on the basis of domain knowledge, including knowledge of constraints and their relative importance, interdependencies among operations, and possibly frequent changes in governing schedule requirements. Unlike many other scheduling software systems, Aurora focuses on resource requirements and temporal scheduling in combination. For example, Aurora can accommodate a domain requirement to schedule two subsequent operations to locations adjacent to a shared resource. The graphical interface allows the user to quickly visualize the schedule and perform changes reflecting additional knowledge or alterations in the situation. For example, the user might drag the activity corresponding to the start of operations to reflect a late delivery.

  16. Scheduling nurses’ shifts at PGI Cikini Hospital

    NASA Astrophysics Data System (ADS)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  17. Scheduling multimedia services in cloud computing environment

    NASA Astrophysics Data System (ADS)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  18. NRC comprehensive records disposition schedule. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate durationmore » of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).« less

  19. Decomposability and scalability in space-based observatory scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.

    1992-01-01

    In this paper, we discuss issues of problem and model decomposition within the HSTS scheduling framework. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) scheduling problem, motivated by the limitations of the current solution and, more generally, the insufficiency of classical planning and scheduling approaches in this problem context. We first summarize the salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research. Then, we describe some key problem decomposition techniques supported by HSTS and underlying our integrated planning and scheduling approach, and we discuss the leverage they provide in solving space-based observatory scheduling problems.

  20. A format for the interchange of scheduling models

    NASA Technical Reports Server (NTRS)

    Jaap, John P.; Davis, Elizabeth K.

    1994-01-01

    In recent years a variety of space-activity schedulers have been developed within the aerospace community. Space-activity schedulers are characterized by their need to handle large numbers of activities which are time-window constrained and make high demands on many scarce resources, but are minimally constrained by predecessor/successor requirements or critical paths. Two needs to exchange data between these schedulers have materialized. First, there is significant interest in comparing and evaluating the different scheduling engines to ensure that the best technology is applied to each scheduling endeavor. Second, there is a developing requirement to divide a single scheduling task among different sites, each using a different scheduler. In fact, the scheduling task for International Space Station Alpha (ISSA) will be distributed among NASA centers and among the international partners. The format used to interchange scheduling data for ISSA will likely use a growth version of the format discussed in this paper. The model interchange format (or MIF, pronounced as one syllable) discussed in this paper is a robust solution to the need to interchange scheduling requirements for space activities. It is highly extensible, human-readable, and can be generated or edited with common text editors. It also serves well the need to support a 'benchmark' data case which can be delivered on any computer platform.

  1. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  2. Plant operation planning and scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jammar, R.J.

    When properly designed, planning and scheduling can actually add millions of dollars per year to the bottom line. Planning and scheduling is a continuum of decisions starting with crude selection and ending with establishing short-term targets for crude processing and blending. It also includes maintaining optimization and operation simulation models. It is thought that conservatively, a refinery may save from $5 million to $10 million a year if it pays more attention to the processes behind proper planning and scheduling. Of course, the amount of savings can reach staggering proportions for companies now at the bottom of the Solomon Associatesmore » Inc. refinery performance ranking.« less

  3. The Ames-Lockheed orbiter processing scheduling system

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Gargan, Robert

    1991-01-01

    A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.

  4. Scheduling multicore workload on shared multipurpose clusters

    NASA Astrophysics Data System (ADS)

    Templon, J. A.; Acosta-Silva, C.; Flix Molina, J.; Forti, A. C.; Pérez-Calero Yzquierdo, A.; Starink, R.

    2015-12-01

    With the advent of workloads containing explicit requests for multiple cores in a single grid job, grid sites faced a new set of challenges in workload scheduling. The most common batch schedulers deployed at HEP computing sites do a poor job at multicore scheduling when using only the native capabilities of those schedulers. This paper describes how efficient multicore scheduling was achieved at the sites the authors represent, by implementing dynamically-sized multicore partitions via a minimalistic addition to the Torque/Maui batch system already in use at those sites. The paper further includes example results from use of the system in production, as well as measurements on the dependence of performance (especially the ramp-up in throughput for multicore jobs) on node size and job size.

  5. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  6. Learning to improve iterative repair scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Davis, Eugene

    1992-01-01

    This paper presents a general learning method for dynamically selecting between repair heuristics in an iterative repair scheduling system. The system employs a version of explanation-based learning called Plausible Explanation-Based Learning (PEBL) that uses multiple examples to confirm conjectured explanations. The basic approach is to conjecture contradictions between a heuristic and statistics that measure the quality of the heuristic. When these contradictions are confirmed, a different heuristic is selected. To motivate the utility of this approach we present an empirical evaluation of the performance of a scheduling system with respect to two different repair strategies. We show that the scheduler that learns to choose between the heuristics outperforms the same scheduler with any one of two heuristics alone.

  7. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan is...

  8. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan is...

  9. 33 CFR 401.58 - Pleasure craft scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  10. An Analysis of Research on Block Scheduling

    ERIC Educational Resources Information Center

    Zepeda, Sally J.; Mayers, R. Stewart

    2006-01-01

    In this analysis of 58 empirical studies of high school block scheduling, the authors report findings in and across five groupings. Within groups, data were inconsistent regarding whether teachers' practices changed, but teachers believed that staff development was necessary to teach in a block schedule. Block scheduling appeared to increase…

  11. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  12. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  13. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  14. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  15. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance.

    PubMed

    Carter, Christine E; Grahn, Jessica A

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the "contextual interference effect." While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  16. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance

    PubMed Central

    Carter, Christine E.; Grahn, Jessica A.

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the “contextual interference effect.” While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  17. Scheduling time-critical graphics on multiple processors

    NASA Technical Reports Server (NTRS)

    Meyer, Tom W.; Hughes, John F.

    1995-01-01

    This paper describes an algorithm for the scheduling of time-critical rendering and computation tasks on single- and multiple-processor architectures, with minimal pipelining. It was developed to manage scientific visualization scenes consisting of hundreds of objects, each of which can be computed and displayed at thousands of possible resolution levels. The algorithm generates the time-critical schedule using progressive-refinement techniques; it always returns a feasible schedule and, when allowed to run to completion, produces a near-optimal schedule which takes advantage of almost the entire multiple-processor system.

  18. Production scheduling and rescheduling with genetic algorithms.

    PubMed

    Bierwirth, C; Mattfeld, D C

    1999-01-01

    A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quality of schedules. Finally, this technique is tested for scheduling and rescheduling in a non-deterministic environment. It is shown by experiment that conventional methods of production control are clearly outperformed at reasonable run-time costs.

  19. Scheduling periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1987-01-01

    One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

  20. 9 CFR 307.4 - Schedule of operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... inspectors shall not, except as provided herein, occur prior to 4 hours after the beginning of scheduled... efficient and effective use of inspection personnel. The work schedule must specify daily clock hours of... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Schedule of operations. 307.4 Section...

  1. 7 CFR 305.16 - Cold treatment schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Cold treatment schedules. 305.16 Section 305.16... SERVICE, DEPARTMENT OF AGRICULTURE PHYTOSANITARY TREATMENTS Cold Treatments § 305.16 Cold treatment schedules. Treatment schedule Temperature ( °F) Exposure period T107-a 1 34 or below 14 days. 35 or below 16...

  2. To Block-Schedule or Not?

    ERIC Educational Resources Information Center

    Mowen, Gregg G.; Mowen, Carol

    2004-01-01

    In this article, the authors discuss the advantages of block scheduling and how it can be an effective educational tool when faced with educational challenges. Block schedules can ease the transition from the homelike atmosphere of the elementary school to the departmentalized environment of the high school by reducing the need for constant class…

  3. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  4. 48 CFR 245.606 - Inventory schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Inventory schedules. 245.606 Section 245.606 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Contractor Inventory 245.606 Inventory schedules. ...

  5. Immunization Schedules for Preteens and Teens

    MedlinePlus

    ... Immunization Schedule for Preteens and Teens (7 through 18 Years) Recommend on Facebook Tweet Share Compartir On ... a Catch-Up or Accelerated Schedule Birth through 18 Years In three easy steps, you can use ...

  6. Stochastic Modeling of Airlines' Scheduled Services Revenue

    NASA Technical Reports Server (NTRS)

    Hamed, M. M.

    1999-01-01

    Airlines' revenue generated from scheduled services account for the major share in the total revenue. As such, predicting airlines' total scheduled services revenue is of great importance both to the governments (in case of national airlines) and private airlines. This importance stems from the need to formulate future airline strategic management policies, determine government subsidy levels, and formulate governmental air transportation policies. The prediction of the airlines' total scheduled services revenue is dealt with in this paper. Four key components of airline's scheduled services are considered. These include revenues generated from passenger, cargo, mail, and excess baggage. By addressing the revenue generated from each schedule service separately, air transportation planners and designers arc able to enhance their ability to formulate specific strategies for each component. Estimation results clearly indicate that the four stochastic processes (scheduled services components) are represented by different Box-Jenkins ARIMA models. The results demonstrate the appropriateness of the developed models and their ability to provide air transportation planners with future information vital to the planning and design processes.

  7. Stochastic Modeling of Airlines' Scheduled Services Revenue

    NASA Technical Reports Server (NTRS)

    Hamed, M. M.

    1999-01-01

    Airlines' revenue generated from scheduled services account for the major share in the total revenue. As such, predicting airlines' total scheduled services revenue is of great importance both to the governments (in case of national airlines) and private airlines. This importance stems from the need to formulate future airline strategic management policies, determine government subsidy levels, and formulate governmental air transportation policies. The prediction of the airlines' total scheduled services revenue is dealt with in this paper. Four key components of airline's scheduled services are considered. These include revenues generated from passenger, cargo, mail, and excess baggage. By addressing the revenue generated from each schedule service separately, air transportation planners and designers are able to enhance their ability to formulate specific strategies for each component. Estimation results clearly indicate that the four stochastic processes (scheduled services components) are represented by different Box-Jenkins ARIMA models. The results demonstrate the appropriateness of the developed models and their ability to provide air transportation planners with future information vital to the planning and design processes.

  8. Achieving reutilization of scheduling software through abstraction and generalization

    NASA Technical Reports Server (NTRS)

    Wilkinson, George J.; Monteleone, Richard A.; Weinstein, Stuart M.; Mohler, Michael G.; Zoch, David R.; Tong, G. Michael

    1995-01-01

    Reutilization of software is a difficult goal to achieve particularly in complex environments that require advanced software systems. The Request-Oriented Scheduling Engine (ROSE) was developed to create a reusable scheduling system for the diverse scheduling needs of the National Aeronautics and Space Administration (NASA). ROSE is a data-driven scheduler that accepts inputs such as user activities, available resources, timing contraints, and user-defined events, and then produces a conflict-free schedule. To support reutilization, ROSE is designed to be flexible, extensible, and portable. With these design features, applying ROSE to a new scheduling application does not require changing the core scheduling engine, even if the new application requires significantly larger or smaller data sets, customized scheduling algorithms, or software portability. This paper includes a ROSE scheduling system description emphasizing its general-purpose features, reutilization techniques, and tasks for which ROSE reuse provided a low-risk solution with significant cost savings and reduced software development time.

  9. Slide Rule For Calculating Curing Schedules

    NASA Technical Reports Server (NTRS)

    Heater, Don

    1995-01-01

    Special-purpose slide rule devised for calculating schedules for storing and curing adhesives, sealants, and other materials characterized by known curing times and shelf lives. Prevents mistakes commonly made in determining storage and curing schedules.

  10. Coordination of appointments for anesthesia care outside of operating rooms using an enterprise-wide scheduling system.

    PubMed

    Dexter, Franklin; Xiao, Yan; Dow, Angella J; Strader, Melissa M; Ho, Danny; Wachtel, Ruth E

    2007-12-01

    An anesthesia department implemented scheduling of anesthetics outside of operating rooms (non-OR) by clerks and nurses from other departments using its hospital's enterprise-wide scheduling system. Observational studies chronicled the change over 2 yr as non-OR time was allocated by specialty, and nonanesthesia clerks and nurses scheduled anesthesia teams. Experimental studies investigated how tabular and graphical displays affected the scheduling of milestones (e.g., NPO times) and appointments before anesthetics. Anesthetics performed in allocated time increased progressively from 0% to 75%. Scheduling of anesthetics by nonanesthesia clerks and nurses increased progressively from 0% to 77%. Consistency of patient instructions was improved. The quality of resulting schedules was good. Implementation was not associated with worsening of multiple operational measures of performance such as cancellation rates, turnover times, or complaints. However, schedulers struggled to understand fasting and arrival times of patients, despite using a web site with statistically generated values in tabular formats. Experiments revealed that people ignored their knowledge that anesthetics can start earlier than scheduled. Participants made good decisions with both tabular and graphical displays when scheduling appointments preceding anesthesia. Enterprise-wide scheduling can coordinate anesthetics with other appointments on the same date and improve consistency and accuracy of patient instructions customized to the probability of an anesthetic starting early. The usefulness of implementation depends on the value in having more patient-centered care and/or in having patients arrive just in time for non-OR anesthesia, surgery, or regional block placement (e.g., at facilities with limited physical space).

  11. Flexible Work Schedules. ERIC Digest.

    ERIC Educational Resources Information Center

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  12. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack

    2010-01-01

    Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

  13. The application of connectionism to query planning/scheduling in intelligent user interfaces

    NASA Technical Reports Server (NTRS)

    Short, Nicholas, Jr.; Shastri, Lokendra

    1990-01-01

    In the mid nineties, the Earth Observing System (EOS) will generate an estimated 10 terabytes of data per day. This enormous amount of data will require the use of sophisticated technologies from real time distributed Artificial Intelligence (AI) and data management. Without regard to the overall problems in distributed AI, efficient models were developed for doing query planning and/or scheduling in intelligent user interfaces that reside in a network environment. Before intelligent query/planning can be done, a model for real time AI planning and/or scheduling must be developed. As Connectionist Models (CM) have shown promise in increasing run times, a connectionist approach to AI planning and/or scheduling is proposed. The solution involves merging a CM rule based system to a general spreading activation model for the generation and selection of plans. The system was implemented in the Rochester Connectionist Simulator and runs on a Sun 3/260.

  14. Science Planning for Multi-Spacecraft Coordinated Observations

    NASA Technical Reports Server (NTRS)

    Maks, Lori; Fishman, Mark; Pell, Vince; Obenschain, Arthur F. (Technical Monitor)

    2002-01-01

    Fulfilling the promise of an era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with a unique opportunity to simultaneously observe with multiple observatories. Yet scheduling multiple observatories simultaneously is highly inefficient when compared to single observatory observations. Thus, programs using multiple observatories are limited not due to scientific restrictions, but due to operational inefficiencies. Each year, a number of proposals are accepted by a space-based observatory for conduction of astronomical observations and gathering of science data for the study of galactic events. Since each space-based observatory uses a set of instruments designed to operate in specific energy regions, most such studies are conducted by submitting observation proposals to multiple observatories, with requests to coordinate among themselves. To assure that the proposed observations can be scheduled, each observatory's staff has to check that the observations are valid and meet all the constraints for their own observatory; in addition, they have to verify that the observations satisfy the constraints of the other observatories. Thus, coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. In order to exploit new paradigms for observatory operation, the Goddard Space Flight Center's Advanced Architectures and Automation Branch has developed a prototype tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the science planning of coordinated observations for multiple spacecraft, as well as to increase the scheduling probability of observations. However, VOLT is also useful for single observatory planning to optimize observatory control. Three space-based missions are interested in using VOLT (the Hubble Space Telescope, the Chandra X

  15. Nonstandard Maternal Work Schedules: Implications for African American Children’s Early Language Outcomes

    PubMed Central

    Odom, Erika C.; Vernon-Feagans, Lynne; Crouter, Ann C.

    2012-01-01

    In this study, observed maternal positive engagement and perception of work-family spillover were examined as mediators of the association between maternal nonstandard work schedules and children’s expressive language outcomes in 231 African American families living in rural households. Mothers reported their work schedules when their child was 24 months of age and children’s expressive language development was assessed during a picture book task at 24 months and with a standardized assessment at 36 months. After controlling for family demographics, child, and maternal characteristics, maternal employment in nonstandard schedules at the 24 month timepoint was associated with lower expressive language ability among African American children concurrently and at 36 months of age. Importantly, the negative association between nonstandard schedules and children’s expressive language ability at 24 months of age was mediated by maternal positive engagement and negative work-family spillover, while at 36 months of age, the association was mediated only by negative work-family spillover. These findings suggest complex links between mothers’ work environments and African American children’s developmental outcomes. PMID:23459591

  16. SPIKE: AI scheduling techniques for Hubble Space Telescope

    NASA Astrophysics Data System (ADS)

    Johnston, Mark D.

    1991-09-01

    AI (Artificial Intelligence) scheduling techniques for HST are presented in the form of the viewgraphs. The following subject areas are covered: domain; HST constraint timescales; HTS scheduling; SPIKE overview; SPIKE architecture; constraint representation and reasoning; use of suitability functions by scheduling agent; SPIKE screen example; advantages of suitability function framework; limiting search and constraint propagation; scheduling search; stochastic search; repair methods; implementation; and status.

  17. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    NASA Technical Reports Server (NTRS)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  18. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  19. Alternative work schedules for female pharmacists.

    PubMed

    Mason, N A; Perry, W R; Ryan, M L

    1991-01-01

    The impact of the increased proportion of women in pharmacy is discussed, and two leadership positions for which part-time work schedules were implemented are described. Issues associated with the increased representation of women include pharmacist shortages, loss of future leaders, decreased staff productivity related to inadequate day-care services, and a reduced earning potential of pharmacists. Many of these problems can be addressed by altering benefit packages and work schedules to enable employees to raise children while continuing to work. Specific strategies include legislation, day-care programs, flex time and flex scheduling, telecommuting, and the creation of alternative work schedules or permanent part-time positions. At the University of Michigan, a part-time position that combines faculty and clinical responsibilities has been in place since 1988. At The Washington Hospital Center, one of the three assistant director of pharmacy positions is part-time. The women in both positions have met or exceeded job performance requirements while raising a family. Issues raised by the increasing number of female pharmacists must be addressed by the profession. Part-time work schedules are one strategy for enabling female pharmacists to meet both their family and career responsibilities.

  20. Firefighter Shift Schedules Affect Sleep Quality.

    PubMed

    Billings, Joel; Focht, Will

    2016-03-01

    The aim of this study was to investigate the prevalence and severity of firefighter sleep quality across department shift schedules. Sleep quality was assessed using a Pittsburgh Sleep Quality Index in a sample of 109 male career firefighters from six fire departments in three Southwestern US states. The three shift schedules studied were 24on/48off, 48on/96off, and Kelly. Seventy-three percent of firefighters report poor sleep quality. The 24on/48off shift schedule is associated with the best sleep quality and Kelly is associated with the worst sleep quality. Firefighters working second jobs report significantly poorer sleep quality than those who do not. Shift schedules that disrupt normal circadian rhythms more result in poorer sleep quality, which can lead to less effective emergency response and increased risk to firefighter health and safety.

  1. Scheduling job shop - A case study

    NASA Astrophysics Data System (ADS)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  2. Human-Machine Collaborative Optimization via Apprenticeship Scheduling

    DTIC Science & Technology

    2016-09-09

    prenticeship Scheduling (COVAS), which performs ma- chine learning using human expert demonstration, in conjunction with optimization, to automatically and ef...ficiently produce optimal solutions to challenging real- world scheduling problems. COVAS first learns a policy from human scheduling demonstration via...apprentice- ship learning , then uses this initial solution to provide a tight bound on the value of the optimal solution, thereby substantially

  3. Proposed Schedule for Fenton Hill Experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albright, James N.; Brown, Donald W.

    To help in planning Fenton Hill experimental operations in concert with preparations for the Long-Term Flow Test (LTFT) next summer, the following schedule is proposed. This schedule fits some of the realities of the next few months, including the Laboratory closure during the Holidays, the seismic monitoring tests in Roswell, and the difficulties of operating during the winter months. Whenever possible, cyclic pumping operations during the colder months will be scheduled so that the pump will be on during the late evening and early morning hours to prevent freezeup.

  4. Shiftwork Scheduling for the 1990s.

    ERIC Educational Resources Information Center

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  5. 20 CFR 10.413 - If a person dies while receiving a schedule award, to whom is the balance of the schedule award...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false If a person dies while receiving a schedule award, to whom is the balance of the schedule award payable? 10.413 Section 10.413 Employees' Benefits... balance of the schedule award payable? The circumstances under which the balance of a schedule award may...

  6. 20 CFR 10.413 - If a person dies while receiving a schedule award, to whom is the balance of the schedule award...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false If a person dies while receiving a schedule award, to whom is the balance of the schedule award payable? 10.413 Section 10.413 Employees' Benefits... balance of the schedule award payable? The circumstances under which the balance of a schedule award may...

  7. XOPPS - OEL PROJECT PLANNER/SCHEDULER TOOL

    NASA Technical Reports Server (NTRS)

    Mulnix, C. L.

    1994-01-01

    XOPPS is a window-based graphics tool for scheduling and project planning that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays the full image of the schedule being edited. The canvas contains a header area for text and a schedule area for plotting graphic representations of milestone objects in a flexible timeline. XOPPS is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided with the capability to automatically convert a milestone event to a slip. A milestone schedule on another computer can be saved to an ASCII file to be read by XOPPS. The program can print a schedule to a PostScript file. Dependencies between objects can also be displayed on the chart through the use of precedence lines. This program is not intended to replace a commercial scheduling/project management program. Because XOPPS has

  8. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  9. Advancing Air Force Scheduling through Modeling Problem Topologies

    DTIC Science & Technology

    2006-08-03

    Merrill on August 23, 2005 and corresponded with Major David Van Veldhuizen in Fall 2005 about obtaining data. 3.4.3 Transitions Analytical Graphics and...observation satellite orbit. Technical Report CRT-2003-27, Centre de recherche sur les transports, July 2003. [5] Van -Dat Cung. ROADEF 2003: Results of the...collaborateurs/etd/default.htm. January, 2004. [15] P.J.M van Laarhoven, E.H.L. Aarts, and J.K. Lenstra. Job shop scheduling by simulated annealing

  10. 7 CFR 305.23 - Steam sterilization treatment schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Steam sterilization treatment schedules. 305.23... HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE PHYTOSANITARY TREATMENTS Heat Treatments § 305.23 Steam sterilization treatment schedules. Treatment schedule Temperature( °F) Pressure Exposure period...

  11. Interaction of reinforcement schedules, a behavioral prosthesis, and work-related behavior in adults with mental retardation.

    PubMed

    Saunders, Richard R; McEntee, Julie E; Saunders, Muriel D

    2005-01-01

    The effects of variable-interval (VI) and fixed-ratio (FR) schedules of reinforcement for work-related behavior and an organizer for the work materials (behavioral prosthesis) were evaluated with 3 adults with severe or profound mental retardation. The participants had been recommended for study because of high rates of off-task and aberrant behavior in their daily vocational training programs. For 2 participants, VI and FR schedules resulted in the same outcome: more aberrant behavior than on-task and off-task behavior combined. The FR schedule nearly eliminated emission of aberrant and off-task behavior by the 3rd participant. Combining the behavioral prosthesis with FR reinforcement (FR+O) increased the proportion of time spent in on-task behavior by all participants under certain FR schedule parameters. Second-by-second analyses of the observation records revealed that FR schedules reduced off-task and aberrant behavior during work sequences (i.e., ratio runs), and FR+O led to a further reduction of these behaviors during postreinforcement pauses. Overall, the results show how organizer and schedule parameters can be adjusted to produce an optimized balance between productivity and reinforcement while undesirable behavior is minimized.

  12. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  13. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  14. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  15. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  16. A computerized resolution of scheduling conflicts.

    PubMed

    Bolinger, R E; McFarlane, M J

    1989-01-01

    Residency training programs in Internal Medicine require resident attendance in a continuity clinic. This inevitably engenders conflicts between scheduling in the ambulatory clinic and the required teaching activities of the in-patient services. Some of the conflicts can be resolved by allowing the in-patient service directors to indicate preferred plans for their residents to attend in the continuity clinic. With this plan, scheduling becomes quite complicated. A computer program is presented with coordinates these service requests with ambulatory clinic scheduling. As a result, a given resident may have his/her clinic day changed on different rotations. The program automatically arbitrates conflicts and publishes the attendance dates for the entire academic year. This information is supplied to the appointment desk so that patients can be scheduled accordingly. This system has resulted in a 74% continuity rate and improved satisfaction by both residents and staff.

  17. Efficient genetic algorithms using discretization scheduling.

    PubMed

    McLay, Laura A; Goldberg, David E

    2005-01-01

    In many applications of genetic algorithms, there is a tradeoff between speed and accuracy in fitness evaluations when evaluations use numerical methods with varying discretization. In these types of applications, the cost and accuracy vary from discretization errors when implicit or explicit quadrature is used to estimate the function evaluations. This paper examines discretization scheduling, or how to vary the discretization within the genetic algorithm in order to use the least amount of computation time for a solution of a desired quality. The effectiveness of discretization scheduling can be determined by comparing its computation time to the computation time of a GA using a constant discretization. There are three ingredients for the discretization scheduling: population sizing, estimated time for each function evaluation and predicted convergence time analysis. Idealized one- and two-dimensional experiments and an inverse groundwater application illustrate the computational savings to be achieved from using discretization scheduling.

  18. Knowledge-based scheduling of arrival aircraft

    NASA Technical Reports Server (NTRS)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  19. CARMENES instrument control system and operational scheduler

    NASA Astrophysics Data System (ADS)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  20. 23 CFR 1340.7 - Observation procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...

  1. 23 CFR 1340.7 - Observation procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...

  2. 23 CFR 1340.7 - Observation procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OBSERVATIONAL SURVEYS OF SEAT BELT USE Survey Design Requirements § 1340.7 Observation procedures. (a) Data collection dates. All survey data shall be collected through direct observation completely within the...), the survey shall be conducted in accordance to the schedule determined in § 1340.6. (b) Roadway and...

  3. Autonomous mission planning and scheduling: Innovative, integrated, responsive

    NASA Technical Reports Server (NTRS)

    Sary, Charisse; Liu, Simon; Hull, Larry; Davis, Randy

    1994-01-01

    Autonomous mission scheduling, a new concept for NASA ground data systems, is a decentralized and distributed approach to scientific spacecraft planning, scheduling, and command management. Systems and services are provided that enable investigators to operate their own instruments. In autonomous mission scheduling, separate nodes exist for each instrument and one or more operations nodes exist for the spacecraft. Each node is responsible for its own operations which include planning, scheduling, and commanding; and for resolving conflicts with other nodes. One or more database servers accessible to all nodes enable each to share mission and science planning, scheduling, and commanding information. The architecture for autonomous mission scheduling is based upon a realistic mix of state-of-the-art and emerging technology and services, e.g., high performance individual workstations, high speed communications, client-server computing, and relational databases. The concept is particularly suited to the smaller, less complex missions of the future.

  4. Integrated planning and scheduling for Earth science data processing

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1995-01-01

    Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

  5. Diverse task scheduling for individualized requirements in cloud manufacturing

    NASA Astrophysics Data System (ADS)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  6. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    PubMed

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  7. Multi-Objective Scheduling for the Cluster II Constellation

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Giuliano, Mark

    2011-01-01

    This paper describes the application of the MUSE multiobjecctive scheduling framework to the Cluster II WBD scheduling domain. Cluster II is an ESA four-spacecraft constellation designed to study the plasma environment of the Earth and it's magnetosphere. One of the instruments on each of the four spacecraft is the Wide Band Data (WBD) plasma wave experiment. We have applied the MUSE evolutionary algorithm to the scheduling problem represented by this instrument, and the result has been adopted and utilized by the WBD schedulers for nearly a year. This paper describes the WBD scheduling problem, its representation in MUSE, and some of the visualization elements that provide insight into objective value tradeoffs.

  8. WFIRST: Exoplanet Target Selection and Scheduling with Greedy Optimization

    NASA Astrophysics Data System (ADS)

    Keithly, Dean; Garrett, Daniel; Delacroix, Christian; Savransky, Dmitry

    2018-01-01

    We present target selection and scheduling algorithms for missions with direct imaging of exoplanets, and the Wide Field Infrared Survey Telescope (WFIRST) in particular, which will be equipped with a coronagraphic instrument (CGI). Optimal scheduling of CGI targets can maximize the expected value of directly imaged exoplanets (completeness). Using target completeness as a reward metric and integration time plus overhead time as a cost metric, we can maximize the sum completeness for a mission with a fixed duration. We optimize over these metrics to create a list of target stars using a greedy optimization algorithm based off altruistic yield optimization (AYO) under ideal conditions. We simulate full missions using EXOSIMS by observing targets in this list for their predetermined integration times. In this poster, we report the theoretical maximum sum completeness, mean number of detected exoplanets from Monte Carlo simulations, and the ideal expected value of the simulated missions.

  9. 23 CFR 140.604 - Reimbursable schedule.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...

  10. 23 CFR 140.604 - Reimbursable schedule.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...

  11. 23 CFR 140.604 - Reimbursable schedule.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...

  12. 23 CFR 140.604 - Reimbursable schedule.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Reimbursable schedule. 140.604 Section 140.604 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.604 Reimbursable schedule. Projects to be financed from other than...

  13. 40 CFR 716.60 - Reporting schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Reporting schedule. 716.60 Section 716.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT HEALTH AND SAFETY DATA REPORTING General Provisions § 716.60 Reporting schedule. (a) General requirements...

  14. 40 CFR 716.60 - Reporting schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Reporting schedule. 716.60 Section 716.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT HEALTH AND SAFETY DATA REPORTING General Provisions § 716.60 Reporting schedule. (a) General requirements...

  15. 40 CFR 716.60 - Reporting schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Reporting schedule. 716.60 Section 716.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT HEALTH AND SAFETY DATA REPORTING General Provisions § 716.60 Reporting schedule. (a) General requirements...

  16. 40 CFR 716.60 - Reporting schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Reporting schedule. 716.60 Section 716.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT HEALTH AND SAFETY DATA REPORTING General Provisions § 716.60 Reporting schedule. (a) General requirements...

  17. 40 CFR 716.60 - Reporting schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Reporting schedule. 716.60 Section 716.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT HEALTH AND SAFETY DATA REPORTING General Provisions § 716.60 Reporting schedule. (a) General requirements...

  18. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  19. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  20. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  1. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) [Reserved] (b...

  2. 40 CFR 63.1102 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Compliance schedule. 63.1102 Section 63.1102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Technology Standards § 63.1102 Compliance schedule. (a) General requirements. Affected sources, as defined in...

  3. 5 CFR 293.511 - Retention schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Retention schedule. 293.511 Section 293.511 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Employee Medical File System Records § 293.511 Retention schedule. (a) Temporary EMFS records must...

  4. 5 CFR 293.511 - Retention schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Retention schedule. 293.511 Section 293.511 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Employee Medical File System Records § 293.511 Retention schedule. (a) Temporary EMFS records must...

  5. 5 CFR 293.511 - Retention schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Retention schedule. 293.511 Section 293.511 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Employee Medical File System Records § 293.511 Retention schedule. (a) Temporary EMFS records must...

  6. 5 CFR 293.511 - Retention schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Retention schedule. 293.511 Section 293.511 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Employee Medical File System Records § 293.511 Retention schedule. (a) Temporary EMFS records must...

  7. 5 CFR 293.511 - Retention schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Retention schedule. 293.511 Section 293.511 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL RECORDS Employee Medical File System Records § 293.511 Retention schedule. (a) Temporary EMFS records must...

  8. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  9. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  10. 40 CFR 52.1175 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1175 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Michigan § 52.1175 Compliance schedules. (a... Rule 336.49 of the Michigan Air Pollution Control Commission provides for individual compliance...

  11. The association between symptoms of autism and neuropsychological performance in females with Anorexia Nervosa.

    PubMed

    Westwood, Heather; Mandy, William; Tchanturia, Kate

    2017-12-01

    The aim of this study was to investigate the relationship between symptoms of autism spectrum disorder (ASD) and performance on measures of set-shifting and central coherence in a sample of females with anorexia nervosa (AN). Ninety-nine females aged 12-47, recruited from inpatient and day patient eating disorder services, were assessed with the Autism Diagnostic Observation Schedule, 2nd edition (ADOS-2), as well as the Wechsler Abbreviated Scale of Intelligence, 2nd edition (WASI-II); Wisconsin Card Sorting Test (WCST); Rey-Osterrieth Complex Figure Test (ROCFT) and self-report questionnaires assessing eating disorder pathology, depression, cognitive rigidity and attention to detail. Individuals scoring above clinical cut-off on the ADOS-2 (N = 35) reported significantly higher levels of cognitive rigidity than those with lower levels of ASD symptoms but there was no difference between groups on self-reported attention to detail. There group with high levels of ASD symptoms also made significantly more perseverative errors on the WCST but there was no association between ASD symptoms and performance on the ROCFT. The group who scored above cut-off on the ADOS-2 were significantly younger than the sub-clinical groups. The presence of symptoms associated with ASD appears to be related to increased cognitive rigidity in females with AN. Copyright © 2017. Published by Elsevier B.V.

  12. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  13. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  14. 77 FR 64032 - Schedules of Controlled Substances: Extension of Temporary Placement of Methylone Into Schedule I...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-18

    ... is possible, will remain in effect until April 20, 2013, or until rulemaking proceedings are... isomers is possible, into Schedule I of the Controlled Substances Act (CSA). The temporary scheduling of... to the public safety pursuant to 21 U.S.C. 811(h)(1). At the time the Final Order took effect...

  15. Characteristics of HIV patients who missed their scheduled appointments

    PubMed Central

    Nagata, Delsa; Gutierrez, Eliana Battaggia

    2016-01-01

    ABSTRACT OBJECTIVE To analyze whether sociodemographic characteristics, consultations and care in special services are associated with scheduled infectious diseases appointments missed by people living with HIV. METHODS This cross-sectional and analytical study included 3,075 people living with HIV who had at least one scheduled appointment with an infectologist at a specialized health unit in 2007. A secondary data base from the Hospital Management & Information System was used. The outcome variable was missing a scheduled medical appointment. The independent variables were sex, age, appointments in specialized and available disciplines, hospitalizations at the Central Institute of the Clinical Hospital at the Faculdade de Medicina of the Universidade de São Paulo, antiretroviral treatment and change of infectologist. Crude and multiple association analysis were performed among the variables, with a statistical significance of p ≤ 0.05. RESULTS More than a third (38.9%) of the patients missed at least one of their scheduled infectious diseases appointments; 70.0% of the patients were male. The rate of missed appointments was 13.9%, albeit with no observed association between sex and absences. Age was inversely associated to missed appointment. Not undertaking anti-retroviral treatment, having unscheduled infectious diseases consultations or social services care and being hospitalized at the Central Institute were directly associated to missed appointments. CONCLUSIONS The Hospital Management & Information System proved to be a useful tool for developing indicators related to the quality of health care of people living with HIV. Other informational systems, which are often developed for administrative purposes, can also be useful for local and regional management and for evaluating the quality of care provided for patients living with HIV. PMID:26786472

  16. From non-preemptive to preemptive scheduling using synchronization synthesis.

    PubMed

    Černý, Pavol; Clarke, Edmund M; Henzinger, Thomas A; Radhakrishna, Arjun; Ryzhyk, Leonid; Samanta, Roopsha; Tarrach, Thorsten

    2017-01-01

    We present a computer-aided programming approach to concurrency. The approach allows programmers to program assuming a friendly, non-preemptive scheduler, and our synthesis procedure inserts synchronization to ensure that the final program works even with a preemptive scheduler. The correctness specification is implicit, inferred from the non-preemptive behavior. Let us consider sequences of calls that the program makes to an external interface. The specification requires that any such sequence produced under a preemptive scheduler should be included in the set of sequences produced under a non-preemptive scheduler. We guarantee that our synthesis does not introduce deadlocks and that the synchronization inserted is optimal w.r.t. a given objective function. The solution is based on a finitary abstraction, an algorithm for bounded language inclusion modulo an independence relation, and generation of a set of global constraints over synchronization placements. Each model of the global constraints set corresponds to a correctness-ensuring synchronization placement. The placement that is optimal w.r.t. the given objective function is chosen as the synchronization solution. We apply the approach to device-driver programming, where the driver threads call the software interface of the device and the API provided by the operating system. Our experiments demonstrate that our synthesis method is precise and efficient. The implicit specification helped us find one concurrency bug previously missed when model-checking using an explicit, user-provided specification. We implemented objective functions for coarse-grained and fine-grained locking and observed that different synchronization placements are produced for our experiments, favoring a minimal number of synchronization operations or maximum concurrency, respectively.

  17. Scheduling Independent Partitions in Integrated Modular Avionics Systems

    PubMed Central

    Du, Chenglie; Han, Pengcheng

    2016-01-01

    Recently the integrated modular avionics (IMA) architecture has been widely adopted by the avionics industry due to its strong partition mechanism. Although the IMA architecture can achieve effective cost reduction and reliability enhancement in the development of avionics systems, it results in a complex allocation and scheduling problem. All partitions in an IMA system should be integrated together according to a proper schedule such that their deadlines will be met even under the worst case situations. In order to help provide a proper scheduling table for all partitions in IMA systems, we study the schedulability of independent partitions on a multiprocessor platform in this paper. We firstly present an exact formulation to calculate the maximum scaling factor and determine whether all partitions are schedulable on a limited number of processors. Then with a Game Theory analogy, we design an approximation algorithm to solve the scheduling problem of partitions, by allowing each partition to optimize its own schedule according to the allocations of the others. Finally, simulation experiments are conducted to show the efficiency and reliability of the approach proposed in terms of time consumption and acceptance ratio. PMID:27942013

  18. 77 FR 10391 - Harmonizing Schedule I Drug Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... [Docket No. FMCSA-2011-0073] RIN 2126-AB35 Harmonizing Schedule I Drug Requirements AGENCY: Federal Motor... the medical examination report to clarify that drivers may not use Schedule I drugs and be qualified...; email: [email protected] . SUPPLEMENTARY INFORMATION: FMCSA's recent rule harmonizing Schedule I drug...

  19. Timing Is Everything: Adapting to the Flexible Schedule.

    ERIC Educational Resources Information Center

    Browne, Karen Stevens; Burton, Linda

    1989-01-01

    Discusses the benefits of flexible scheduling in school media centers and emphasizes the importance of cooperation among media specialists, teachers, administrators, and volunteers in successfully implementing flexible scheduling. The experiences of a school media specialist who introduced flexible scheduling in the media center at Whiskey Bottom…

  20. 7 CFR 305.8 - Sulfuryl fluoride treatment schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Sulfuryl fluoride treatment schedules. 305.8 Section 305.8 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH... fluoride treatment schedules. Treatment schedule Pressure Temperature ( °F) Dosage rate(lb/1000 cubic feet...

  1. 29 CFR 1952.241 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... extended training plan of substantially permanent form will be developed and adopted by October 1, 1976. (e... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Alaska § 1952.241 Developmental schedule. The Alaska plan is developmental. The Schedule of developmental steps (described in the plan as...

  2. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  3. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  4. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  5. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  6. Research on scheduling of robotic transient survey for Antarctic Survey Telescopes (AST3)

    NASA Astrophysics Data System (ADS)

    Liu, Qiang; Wei, Peng; Shang, Zhao-Hui; Ma, Bin; Hu, Yi

    2018-01-01

    Antarctic Survey Telescopes (AST3) are designed to be fully robotic telescopes at Dome A, Antarctica, which aim for highly efficient time-domain sky surveys as well as rapid response to special transient events (e.g., gamma-ray bursts, near-Earth asteroids, supernovae, etc.). Unlike traditional observations, a well-designed real-time survey scheduler is needed in order to implement an automatic survey in a very efficient, reliable and flexible way for the unattended telescopes. We present a study of the survey strategy for AST3 and implementation of its survey scheduler, which is also useful for other survey projects.

  7. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  8. Littoral Combat Ship Crew Scheduling

    DTIC Science & Technology

    2015-03-01

    events and schedules. The selection of u for each sub-problem also has the same tradeoff considerations of balancing solve time and overly myopic ...extending them beyond four months in a phase. Results are compared based on solve time and penalty value. The MIP solution has the best quality...benefits to crew alignment for longer-range schedules. The planner must balance solve time and solution quality when determining the approach to

  9. Multi-criteria evaluation methods in the production scheduling

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Krenczyk, D.; Paprocka, I.; Kempa, W.; Grabowik, C.

    2016-08-01

    The paper presents a discussion on the practical application of different methods of multi-criteria evaluation in the process of scheduling in manufacturing systems. Among the methods two main groups are specified: methods based on the distance function (using metacriterion) and methods that create a Pareto set of possible solutions. The basic criteria used for scheduling were also described. The overall procedure of evaluation process in production scheduling was presented. It takes into account the actions in the whole scheduling process and human decision maker (HDM) participation. The specified HDM decisions are related to creating and editing a set of evaluation criteria, selection of multi-criteria evaluation method, interaction in the searching process, using informal criteria and making final changes in the schedule for implementation. According to need, process scheduling may be completely or partially automated. Full automatization is possible in case of metacriterion based objective function and if Pareto set is selected - the final decision has to be done by HDM.

  10. Future Air Traffic Growth and Schedule Model, Supplement

    NASA Technical Reports Server (NTRS)

    Kimmel, William M. (Technical Monitor); Smith, Jeremy C.; Dollyhigh, Samuel M.

    2004-01-01

    The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

  11. FASTER - A tool for DSN forecasting and scheduling

    NASA Technical Reports Server (NTRS)

    Werntz, David; Loyola, Steven; Zendejas, Silvino

    1993-01-01

    FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling JPL's Deep Space Network (DSN). The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER consists of MS-Windows based programs that replace two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to 'look ahead' at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.

  12. 32 CFR 204.9 - Schedule of fees and rates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Schedule of fees and rates. 204.9 Section 204.9 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS USER FEES § 204.9 Schedule of fees and rates. (a) Schedule of fees and rates. (1) This schedule...

  13. Analysis of sequencing and scheduling methods for arrival traffic

    NASA Technical Reports Server (NTRS)

    Neuman, Frank; Erzberger, Heinz

    1990-01-01

    The air traffic control subsystem that performs scheduling is discussed. The function of the scheduling algorithms is to plan automatically the most efficient landing order and to assign optimally spaced landing times to all arrivals. Several important scheduling algorithms are described and the statistical performance of the scheduling algorithms is examined. Scheduling brings order to an arrival sequence for aircraft. First-come-first-served scheduling (FCFS) establishes a fair order, based on estimated times of arrival, and determines proper separations. Because of the randomness of the traffic, gaps will remain in the scheduled sequence of aircraft. These gaps are filled, or partially filled, by time-advancing the leading aircraft after a gap while still preserving the FCFS order. Tightly scheduled groups of aircraft remain with a mix of heavy and large aircraft. Separation requirements differ for different types of aircraft trailing each other. Advantage is taken of this fact through mild reordering of the traffic, thus shortening the groups and reducing average delays. Actual delays for different samples with the same statistical parameters vary widely, especially for heavy traffic.

  14. Incremental Scheduling Engines for Human Exploration of the Cosmos

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  15. A Program Master Schedule Can Improve Results

    DTIC Science & Technology

    2014-02-01

    A Program Master Schedule Can Improve Results Patrick K. Barker “There cannot be a crisis today; my schedule is already full.” —Henry Kissinger...often necessary—for clear communication . However, over-reliance on eye-pleasing graphics risks projecting a false impression of SA over a dy- namic...for poor scheduling discipline, lack of believability and/or poor communication . As the saying goes, garbage in equals garbage out. On the other

  16. Management of Temporal Constraints for Factory Scheduling.

    DTIC Science & Technology

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  17. COMPASS: A general purpose computer aided scheduling tool

    NASA Technical Reports Server (NTRS)

    Mcmahon, Mary Beth; Fox, Barry; Culbert, Chris

    1991-01-01

    COMPASS is a generic scheduling system developed by McDonnell Douglas under the direction of the Software Technology Branch at JSC. COMPASS is intended to illustrate the latest advances in scheduling technology and provide a basis from which custom scheduling systems can be built. COMPASS was written in Ada to promote readability and to conform to potential NASA Space Station Freedom standards. COMPASS has some unique characteristics that distinguishes it from commercial products. These characteristics are discussed and used to illustrate some differences between scheduling tools.

  18. Childhood Vaccine Schedule

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  19. Dry kiln schedules for commercial woods : temperate and tropical

    Treesearch

    R. Sidney Boone; Charles J. Kozlik; Paul J. Bois; Eugene M. Wengert

    1988-01-01

    This report contains suggested dry kiln schedules for over 500 commercial woods, both temperate and tropical. Kiln schedules are completely assembled and written out for easy use. Schedules for several thicknesses and specialty products (e.g. squares, handle stock, gunstock blanks) are given for many species. The majority of the schedules are from the world literature...

  20. Genetic algorithm to solve the problems of lectures and practicums scheduling

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.