2016-04-04
Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using...ABSTRACT This Test Operations Procedure (TOP) describes typical equipment and procedures to setup and operate a Video Target Scoring System (VTSS) to...lights. 15. SUBJECT TERMS Video Target Scoring System, VTSS, witness screens, camera, target screen, light pole 16. SECURITY
Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing
2018-04-27
Evaluation Command 6617 Aberdeen Boulevard Aberdeen Proving Ground, MD 21005-5001 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S...AND EVALUATION COMMAND TEST OPERATIONS PROCEDURE *Test Operations Procedure 08-2-188 27 April 2018 DTIC AD No. CHEMICAL POINT DETECTOR VAPOR...188 27 April 2018 2 1. SCOPE. This Test Operations Procedure (TOP), which has been endorsed by the Test and Evaluation Capabilities and
46 CFR 130.480 - Test procedure and operations manual.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Test procedure and operations manual. 130.480 Section... VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.480 Test procedure and operations manual. (a) A procedure for tests to be conducted on automated...
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 25 2013-07-01 2013-07-01 false Standard operating procedures. 160.81... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting forth study...
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 24 2014-07-01 2014-07-01 false Standard operating procedures. 160.81... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting forth study...
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 25 2012-07-01 2012-07-01 false Standard operating procedures. 160.81... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting forth study...
21 CFR 58.81 - Standard operating procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Testing Facilities Operation § 58.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting... following: (1) Animal room preparation. (2) Animal care. (3) Receipt, identification, storage, handling...
21 CFR 58.81 - Standard operating procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Testing Facilities Operation § 58.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting... following: (1) Animal room preparation. (2) Animal care. (3) Receipt, identification, storage, handling...
21 CFR 58.81 - Standard operating procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Testing Facilities Operation § 58.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting... following: (1) Animal room preparation. (2) Animal care. (3) Receipt, identification, storage, handling...
21 CFR 58.81 - Standard operating procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Testing Facilities Operation § 58.81 Standard operating procedures. (a) A testing facility shall have standard operating procedures in writing setting... following: (1) Animal room preparation. (2) Animal care. (3) Receipt, identification, storage, handling...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What test methods and other procedures... Internal Combustion Engines Testing Requirements for Owners and Operators § 60.4244 What test methods and...? Owners and operators of stationary SI ICE who conduct performance tests must follow the procedures in...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What test methods and other procedures... Internal Combustion Engines Testing Requirements for Owners and Operators § 60.4244 What test methods and...? Owners and operators of stationary SI ICE who conduct performance tests must follow the procedures in...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What test methods and other procedures... Internal Combustion Engines Testing Requirements for Owners and Operators § 60.4244 What test methods and...? Owners and operators of stationary SI ICE who conduct performance tests must follow the procedures in...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What test methods and other procedures... Internal Combustion Engines Testing Requirements for Owners and Operators § 60.4244 What test methods and...? Owners and operators of stationary SI ICE who conduct performance tests must follow the procedures in...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What test methods and other procedures... Internal Combustion Engines Testing Requirements for Owners and Operators § 60.4244 What test methods and...? Owners and operators of stationary SI ICE who conduct performance tests must follow the procedures in...
Representing operations procedures using temporal dependency networks
NASA Technical Reports Server (NTRS)
Fayyad, Kristina E.; Cooper, Lynne P.
1993-01-01
DSN Link Monitor & Control (LMC) operations consist primarily of executing procedures to configure, calibrate, test, and operate a communications link between an interplanetary spacecraft and its mission control center. Currently the LMC operators are responsible for integrating procedures into an end-to-end series of steps. The research presented in this paper is investigating new ways of specifying operations procedures that incorporate the insight of operations, engineering, and science personnel to improve mission operations. The paper describes the rationale for using Temporal Dependency Networks (TDN's) to represent the procedures, a description of how the data is acquired, and the knowledge engineering effort required to represent operations procedures. Results of operational tests of this concept, as implemented in the LMC Operator Assistant Prototype (LMCOA), are also presented.
Safety validation test equipment operation
NASA Astrophysics Data System (ADS)
Kurosaki, Tadaaki; Watanabe, Takashi
1992-08-01
An overview of the activities conducted on safety validation test equipment operation for materials used for NASA manned missions is presented. Safety validation tests, such as flammability, odor, offgassing, and so forth were conducted in accordance with NASA-NHB-8060.1C using test subjects common with those used by NASA, and the equipment used were qualified for their functions and performances in accordance with NASDA-CR-99124 'Safety Validation Test Qualification Procedures.' Test procedure systems were established by preparing 'Common Procedures for Safety Validation Test' as well as test procedures for flammability, offgassing, and odor tests. The test operation organization chaired by the General Manager of the Parts and Material Laboratory of NASDA (National Space Development Agency of Japan) was established, and the test leaders and operators in the organization were qualified in accordance with the specified procedures. One-hundred-one tests had been conducted so far by the Parts and Material Laboratory according to the request submitted by the manufacturers through the Space Station Group and the Safety and Product Assurance for Manned Systems Office.
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 33 2013-07-01 2013-07-01 false Standard operating procedures. 792.81... operating procedures. (a) A testing facility shall have standard operating procedures in writing, setting... data generated in the course of a study. All deviations in a study from standard operating procedures...
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 33 2012-07-01 2012-07-01 false Standard operating procedures. 792.81... operating procedures. (a) A testing facility shall have standard operating procedures in writing, setting... data generated in the course of a study. All deviations in a study from standard operating procedures...
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 32 2014-07-01 2014-07-01 false Standard operating procedures. 792.81... operating procedures. (a) A testing facility shall have standard operating procedures in writing, setting... data generated in the course of a study. All deviations in a study from standard operating procedures...
NASA Technical Reports Server (NTRS)
1974-01-01
Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.
Test Operations Procedure (TOP) 10-2-400 Open End Compressed Gas Driven Shock Tube
gas-driven shock tube. Procedures are provided for instrumentation, test item positioning, estimation of key test parameters, operation of the shock...tube, data collection, and reporting. The procedures in this document are based on the use of helium gas and Mylar film diaphragms.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... tested in accordance with CPSC-CH-C1001-09.3, Standard Operating Procedure for Determination of...-C1001-09.3, Standard Operating Procedure for Determination of Phthalates, issued on April 1, 2010...-C1001-09.3, Standard Operating Procedure for Determination of Phthalates, and GB/T 22048-2008, Toys and...
Code of Federal Regulations, 2013 CFR
2013-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... covered process have been trained or tested competent in the operating procedures provided in § 68.52 that... safely carry out the duties and responsibilities as provided in the operating procedures. (b) Refresher... operating procedures of the process. The owner or operator, in consultation with the employees operating the...
46 CFR 162.060-24 - Test Plan requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... (including the test facility's standard operating procedures for achieving such conditions). (9) Sampling.... Test Plans must include an examination of all the manufacturer's stated requirements and procedures for... potential environmental, health, and safety issues; unusual operating requirements; and any issues related...
46 CFR 162.060-24 - Test Plan requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... (including the test facility's standard operating procedures for achieving such conditions). (9) Sampling.... Test Plans must include an examination of all the manufacturer's stated requirements and procedures for... potential environmental, health, and safety issues; unusual operating requirements; and any issues related...
46 CFR 162.060-24 - Test Plan requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... (including the test facility's standard operating procedures for achieving such conditions). (9) Sampling.... Test Plans must include an examination of all the manufacturer's stated requirements and procedures for... potential environmental, health, and safety issues; unusual operating requirements; and any issues related...
NASA Astrophysics Data System (ADS)
Colby, R. J.; Parthasarathy, R.; Stimson, A. L.
1983-12-01
The test methods and procedures of the Intelsat TDMA/DSI SSOG are summarized. The overall structure of the SSOG is outlined, and the operational procedures to be followed for joining a new terminal to the system and for normal operations are reviewed, with an emphasis on the roles of the IOC and the TDMA reference and monitoring stations. The testing philosophy (based on minimal interruptions) and the star-test method are explained and illustrated with diagrams, and the test procedures are examined, including modem tests, electrical-path-length equalization, RF/IF downchain tests, protocol tests, nontransmitting protocol tests, IF/RF upchain tests, transmitting protocol tests, baseband tests, and orderwire lineups. The fundamental access discipline of the TDMA system is presented in an appendix.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... referenced: The existing CPSC Standard Operating Procedure for Determining Lead (Pb) in Paint and Other... explicitly require the use of a particular standard operating procedure. Additionally, the following....'' It is still based on standard test procedures, such as ASTM International (formerly the American...
Code of Federal Regulations, 2014 CFR
2014-07-01
... establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this.... (3) Establish revised operating limits according to the applicable procedures in paragraphs (a) and... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What test methods and other procedures...
Code of Federal Regulations, 2012 CFR
2012-07-01
... establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this.... (3) Establish revised operating limits according to the applicable procedures in paragraphs (a) and... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What test methods and other procedures...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 160.90 - Animal and other test system care.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing, feeding, handling, and... terrestrial amphibians used in laboratory procedures that require manipulations and observations over an...
40 CFR 792.90 - Animal and other test system care.
Code of Federal Regulations, 2014 CFR
2014-07-01
... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...
40 CFR 160.90 - Animal and other test system care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing, feeding, handling, and... terrestrial amphibians used in laboratory procedures that require manipulations and observations over an...
40 CFR 160.90 - Animal and other test system care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing, feeding, handling, and... terrestrial amphibians used in laboratory procedures that require manipulations and observations over an...
40 CFR 792.90 - Animal and other test system care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...
40 CFR 792.90 - Animal and other test system care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...
40 CFR 160.90 - Animal and other test system care.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing, feeding, handling, and... terrestrial amphibians used in laboratory procedures that require manipulations and observations over an...
40 CFR 792.90 - Animal and other test system care.
Code of Federal Regulations, 2012 CFR
2012-07-01
... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...
40 CFR 792.90 - Animal and other test system care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...
40 CFR 160.90 - Animal and other test system care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing, feeding, handling, and... terrestrial amphibians used in laboratory procedures that require manipulations and observations over an...
Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory
We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.
40 CFR 60.54 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operator may use either of the following procedures to determine the adjusted CO2 concentration. (1) The... owner or operator shall use as reference methods and procedures the test methods in appendix A of this... follows: (1) The concentration (c12) of particulate matter, corrected to 12 percent CO2, shall be computed...
40 CFR 60.54 - Test methods and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator may use either of the following procedures to determine the adjusted CO2 concentration. (1) The... owner or operator shall use as reference methods and procedures the test methods in appendix A of this... follows: (1) The concentration (c12) of particulate matter, corrected to 12 percent CO2, shall be computed...
40 CFR 60.54 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (c) The owner or operator may use either of the following procedures to determine the adjusted CO2... owner or operator shall use as reference methods and procedures the test methods in appendix A of this... follows: (1) The concentration (c12) of particulate matter, corrected to 12 percent CO2, shall be computed...
14 CFR 125.287 - Initial and recurrent pilot testing requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS... air navigation aids appropriate to the operation of pilot authorization, including, when applicable, instrument approach facilities and procedures; (5) Air traffic control procedures, including IFR procedures...
47 CFR 80.96 - Maintenance tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Maintenance tests. 80.96 Section 80.96 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Operating Procedures-General § 80.96 Maintenance tests. Stations are authorized to...
40 CFR 60.675 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.675... Mineral Processing Plants § 60.675 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in...
40 CFR 60.644 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.644... Gas Processing: SO2 Emissions § 60.644 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test...
40 CFR 60.503 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...
40 CFR 60.503 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...
40 CFR 60.503 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...
40 CFR 60.503 - Test methods and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...
40 CFR 60.503 - Test methods and procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...
40 CFR 264.1034 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Test methods and procedures. 264.1034... Air Emission Standards for Process Vents § 264.1034 Test methods and procedures. (a) Each owner or operator subject to the provisions of this subpart shall comply with the test methods and procedures...
40 CFR 264.1063 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Test methods and procedures. 264.1063... Air Emission Standards for Equipment Leaks § 264.1063 Test methods and procedures. (a) Each owner or operator subject to the provisions of this subpart shall comply with the test methods and procedures...
40 CFR 86.884-5 - Test procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...
40 CFR 86.884-5 - Test procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...
40 CFR 86.884-5 - Test procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote smoke...
21 CFR 680.1 - Allergenic Products.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) Mold manufacturers shall maintain written standard operating procedures, developed by a qualified... representative species of mold subject to the standard operating procedures. The tests shall be performed at each manufacturing step during and subsequent to harvest, as specified in the standard operating procedures. Before...
21 CFR 680.1 - Allergenic Products.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Mold manufacturers shall maintain written standard operating procedures, developed by a qualified... representative species of mold subject to the standard operating procedures. The tests shall be performed at each manufacturing step during and subsequent to harvest, as specified in the standard operating procedures. Before...
21 CFR 680.1 - Allergenic Products.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Mold manufacturers shall maintain written standard operating procedures, developed by a qualified... representative species of mold subject to the standard operating procedures. The tests shall be performed at each manufacturing step during and subsequent to harvest, as specified in the standard operating procedures. Before...
21 CFR 680.1 - Allergenic Products.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Mold manufacturers shall maintain written standard operating procedures, developed by a qualified... representative species of mold subject to the standard operating procedures. The tests shall be performed at each manufacturing step during and subsequent to harvest, as specified in the standard operating procedures. Before...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., implement, and maintain written standard operating procedures for each assay performed for drug and specimen... facility shall develop, implement, and maintain written standard operating procedures for each test. The...; (2) Preparation of reagents, standards, and controls; (3) Calibration procedures; (4) Derivation of...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., implement, and maintain written standard operating procedures for each assay performed for drug and specimen... facility shall develop, implement, and maintain written standard operating procedures for each test. The...; (2) Preparation of reagents, standards, and controls; (3) Calibration procedures; (4) Derivation of...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., implement, and maintain written standard operating procedures for each assay performed for drug and specimen... facility shall develop, implement, and maintain written standard operating procedures for each test. The...; (2) Preparation of reagents, standards, and controls; (3) Calibration procedures; (4) Derivation of...
Apollo Operations Handbook Lunar Module (LM 11 and Subsequent) Vol. 2 Operational Procedures
NASA Technical Reports Server (NTRS)
1971-01-01
The Apollo Operations Handbook (AOH) is the primary means of documenting LM descriptions and procedures. The AOH is published in two separately bound volumes. This information is useful in support of program management, engineering, test, flight simulation, and real time flight support efforts. This volume contains crew operational procedures: normal, backup, abort, malfunction, and emergency. These procedures define the sequence of actions necessary for safe and efficient subsystem operation.
40 CFR 63.1348 - Compliance requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... emissions standards and operating limits by using the test methods and procedures in §§ 63.1349 and 63.7... Emission Standards and Operating Limits § 63.1348 Compliance requirements. (a) Initial Performance Test... with the PM emissions standards by using the test methods and procedures in § 63.1349(b)(1). (2...
40 CFR 63.1348 - Compliance requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... emissions standards and operating limits by using the test methods and procedures in §§ 63.1349 and 63.7... Emission Standards and Operating Limits § 63.1348 Compliance requirements. (a) Initial Performance Test... with the PM emissions standards by using the test methods and procedures in § 63.1349(b)(1). (2...
Operability test report for the in SITU vapor sampling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corbett, J.E., Westinghouse Hanford
1996-05-31
This report documents the successful completion of testing for the In Situ Vapor Sampling (ISVS) system. The report includes the test procedure (WHC-SD-WM-OTP-196, Rev OA), data sheets, exception resolutions, and a test report summary. This report conforms to the guidelines established in WHC-IP-1026, `Engineering Practice Guidelines,` Appendix L, `Operability Test Procedures and Reports.`
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2009-01-01
This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.
Light duty utility arm phase 2 qualification test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, G.A.
1997-01-16
This Acceptance Test Procedure (ATP) will test and verify that the Exhauster meets the specified functional requirements, safety requirements, operating requirements, and provide a record of the functional test results. The system/functions that will be tested are listed in the scope section of the Acceptance Test Procedure.
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
Specific test and evaluation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), andmore » Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baggu, Murali M; Smith, Kandler A; Friedl, Andrew
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS withmore » little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.« less
This technical note documents changes in the standard operating procedures used at the Environmental Protection Agency's (U.S. EPA) aerosol testing wind tunnel facility for testing of particulate matter monitoring methods of PM2.5 and PM10. These changes are relative to the op...
ERIC Educational Resources Information Center
West, Alfred W.
This is the first in a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. Part I of this document deals with physical observations which should be performed during each routine control test. Part II…
40 CFR 1066.830 - Supplemental Federal Test Procedures; overview.
Code of Federal Regulations, 2014 CFR
2014-07-01
... driving and a sequence of vehicle operation that accounts for the impact of the vehicle's air conditioner...) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Exhaust Emission Test Procedures for Motor Vehicles... results from the aggressive driving test element (§ 1066.831), the air conditioning test element (§ 1066...
Code of Federal Regulations, 2011 CFR
2011-07-01
...-specific operating limits according to the procedures in paragraphs (a)(1) through (3) of this section. (1... establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this... site-specific operating limit according to the procedures in paragraphs (c)(1) or (2) of this section...
Code of Federal Regulations, 2012 CFR
2012-07-01
...-specific operating limits according to the procedures in paragraphs (a)(1) through (3) of this section. (1... establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this... site-specific operating limit according to the procedures in paragraphs (c)(1) or (2) of this section...
Code of Federal Regulations, 2014 CFR
2014-07-01
...-specific operating limits according to the procedures in paragraphs (a)(1) through (3) of this section. (1... establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this... site-specific operating limit according to the procedures in paragraphs (c)(1) or (2) of this section...
Code of Federal Regulations, 2013 CFR
2013-07-01
...-specific operating limits according to the procedures in paragraphs (a)(1) through (3) of this section. (1... establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this... site-specific operating limit according to the procedures in paragraphs (c)(1) or (2) of this section...
Code of Federal Regulations, 2010 CFR
2010-07-01
...-specific operating limits according to the procedures in paragraphs (a)(1) through (3) of this section. (1... establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this... site-specific operating limit according to the procedures in paragraphs (c)(1) or (2) of this section...
14 CFR 34.5 - Special test procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES General Provisions § 34.5 Special test... or operator of aircraft or aircraft engines, approve test procedures for any aircraft or aircraft engine that is not susceptible to satisfactory testing by the procedures set forth herein. Prior to...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
46 CFR 160.066-12 - Operational tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Operational tests. 160.066-12 Section 160.066-12....066-12 Operational tests. (a) The procedure for conducting operational tests is described in figure (1). (1) An “accept lot” decision must be reached in order to pass the operational tests. (2) If a “reject...
46 CFR 160.066-12 - Operational tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Operational tests. 160.066-12 Section 160.066-12....066-12 Operational tests. (a) The procedure for conducting operational tests is described in figure (1). (1) An “accept lot” decision must be reached in order to pass the operational tests. (2) If a “reject...
Receipt and Inspection of Chemical - Biological (CB) Materiel
2017-08-31
Policy and Standardization Division (CSTE-TM) U.S. Army Test and Evaluation Command 2202 Aberdeen Boulevard Aberdeen Proving Ground, MD 21005-5001...in this TOP is intended for use in the receipt inspection of CB materiel and systems tested by the U.S. Army Test and Evaluation Command (ATEC). The...This page is intentionally blank.) U.S. ARMY TEST AND EVALUATION COMMAND TEST OPERATIONS PROCEDURE *Test Operations Procedure 08-2-500A 31
Turrentine, Florence E; Wang, Hongkun; Young, Jeffrey S; Calland, James Forrest
2010-08-01
Ever-increasing numbers of in-house acute care surgeons and competition for operating room time during normal daytime business hours have led to an increased frequency of nonemergent general and vascular surgery procedures occurring at night when there are fewer residents, consultants, nurses, and support staff available for assistance. This investigation tests the hypothesis that patients undergoing such procedures after hours are at increased risk for postoperative morbidity and mortality. Clinical data for 10,426 operative procedures performed over a 5-year period at a single academic tertiary care hospital were obtained from the American College of Surgeons National Surgical Quality Improvement Program Database. The prevalence of preoperative comorbid conditions, postoperative length of stay, morbidity, and mortality was compared between two cohorts of patients: one who underwent nonemergent operative procedures at night and other who underwent similar procedures during the day. Subsequent statistical comparisons utilized chi tests for comparisons of categorical variables and F-tests for continuous variables. Patients undergoing procedures at night had a greater prevalence of serious preoperative comorbid conditions. Procedure complexity as measured by relative value unit did not differ between groups, but length of stay was longer after night procedures (7.8 days vs. 4.3 days, p < 0.0001). Patients undergoing nonemergent general and vascular surgery procedures at night in an academic medical center do not seem to be at increased risk for postoperative morbidity or mortality. Performing nonemergent procedures at night seems to be a safe solution for daytime overcrowding of operating rooms.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Sample emissions. (6) Record post-test data. (7) Perform post-test procedures to verify proper operation... PROCEDURES Vehicle Preparation and Running a Test § 1066.401 Overview. (a) Use the procedures detailed in... to: (1) Determine road-load power, test weight, and inertia class. (2) Prepare the vehicle, equipment...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Sample emissions. (6) Record post-test data. (7) Perform post-test procedures to verify proper operation... PROCEDURES Vehicle Preparation and Running a Test § 1066.401 Overview. (a) Use the procedures detailed in... to: (1) Determine road-load power, test weight, and inertia class. (2) Prepare the vehicle, equipment...
Project W-314 specific test and evaluation plan for AZ tank farm upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-08-12
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests andmore » inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.« less
40 CFR 63.565 - Test methods and procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...
40 CFR 63.565 - Test methods and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...
40 CFR 63.565 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...
40 CFR 63.565 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...
40 CFR 63.565 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Test methods and procedures. 63.565... Standards for Marine Tank Vessel Loading Operations § 63.565 Test methods and procedures. (a) Performance... as possible to the connection with the marine tank vessel; and (3) During the performance test...
40 CFR 86.1227-96 - Test procedures; overview.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Methanol-Fueled Heavy-Duty Vehicles § 86.1227-96 Test procedures; overview. (a) The overall test consists... petroleum gas-fueled, and methanol-fueled vehicles) is designed to determine hydrocarbon and/or methanol... operation, which result in hydrocarbon and/or methanol vapor losses. The test procedure is designed to...
DOT National Transportation Integrated Search
2006-01-09
The design and flight test of a Continuous Descent Approach (CDA) : procedure for regular nighttime operation at Louisville : International Airport are described in this report. Results of : the analyses of aircraft and FMS performance indicate that ...
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... data generated in the course of a study. All deviations in a study from standard operating procedures shall be authorized by the study director and shall be documented in the raw data. Significant changes...) Test system room preparation. (2) Test system care. (3) Receipt, identification, storage, handling...
40 CFR 792.81 - Standard operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... data generated in the course of a study. All deviations in a study from standard operating procedures shall be authorized by the study director and shall be documented in the raw data. Significant changes...) Test system room preparation. (2) Test system care. (3) Receipt, identification, storage, handling...
29 CFR 1926.1427 - Operator qualification and certification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... determination that industry recognized criteria for written testing materials, practical examinations, test... tests that: (A) Assess the operator applicant regarding, at a minimum, the knowledge and skills listed... an operator applicant fails a test or is decertified. (iv) Have testing procedures for re...
29 CFR 1926.1427 - Operator qualification and certification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determination that industry recognized criteria for written testing materials, practical examinations, test... tests that: (A) Assess the operator applicant regarding, at a minimum, the knowledge and skills listed... an operator applicant fails a test or is decertified. (iv) Have testing procedures for re...
29 CFR 1926.1427 - Operator qualification and certification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determination that industry recognized criteria for written testing materials, practical examinations, test... tests that: (A) Assess the operator applicant regarding, at a minimum, the knowledge and skills listed... an operator applicant fails a test or is decertified. (iv) Have testing procedures for re...
29 CFR 1926.1427 - Operator qualification and certification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determination that industry recognized criteria for written testing materials, practical examinations, test... tests that: (A) Assess the operator applicant regarding, at a minimum, the knowledge and skills listed... an operator applicant fails a test or is decertified. (iv) Have testing procedures for re...
Operator procedure verification with a rapidly reconfigurable simulator
NASA Technical Reports Server (NTRS)
Iwasaki, Yumi; Engelmore, Robert; Fehr, Gary; Fikes, Richard
1994-01-01
Generating and testing procedures for controlling spacecraft subsystems composed of electro-mechanical and computationally realized elements has become a very difficult task. Before a spacecraft can be flown, mission controllers must envision a great variety of situations the flight crew may encounter during a mission and carefully construct procedures for operating the spacecraft in each possible situation. If, despite extensive pre-compilation of control procedures, an unforeseen situation arises during a mission, the mission controller must generate a new procedure for the flight crew in a limited amount of time. In such situations, the mission controller cannot systematically consider and test alternative procedures against models of the system being controlled, because the available simulator is too large and complex to reconfigure, run, and analyze quickly. A rapidly reconfigurable simulation environment that can execute a control procedure and show its effects on system behavior would greatly facilitate generation and testing of control procedures both before and during a mission. The How Things Work project at Stanford University has developed a system called DME (Device Modeling Environment) for modeling and simulating the behavior of electromechanical devices. DME was designed to facilitate model formulation and behavior simulation of device behavior including both continuous and discrete phenomena. We are currently extending DME for use in testing operator procedures, and we have built a knowledge base for modeling the Reaction Control System (RCS) of the space shuttle as a testbed. We believe that DME can facilitate design of operator procedures by providing mission controllers with a simulation environment that meets all these requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2010 CFR
2010-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2014 CFR
2014-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2013 CFR
2013-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2012 CFR
2012-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures
NASA Technical Reports Server (NTRS)
Martin, J. J.; Reid, R. S.
2010-01-01
Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.
Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnette, Daniel Wayne
This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some ofmore » the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.« less
Ground Software Maintenance Facility (GSMF) user's manual
NASA Technical Reports Server (NTRS)
Aquila, V.; Derrig, D.; Griffith, G.
1986-01-01
Instructions for the Ground Software Maintenance Facility (GSMF) system user is provided to operate the GSMF in all modes. The GSMF provides the resources for the Automatic Test Equipment (ATE) computer program maintenance (GCOS and GOAL). Applicable reference documents are listed. An operational overview and descriptions of the modes in terms of operator interface, options, equipment, material utilization, and operational procedures are contained. Test restart procedures are described. The GSMF documentation tree is presented including the user manual.
Lageos assembly operation plan
NASA Technical Reports Server (NTRS)
Brueger, J.
1975-01-01
Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.
40 CFR 1065.10 - Other procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... meet all applicable emission standards. (b) Our testing. These procedures generally apply for testing... importance of pursuing changes to the procedures: (i) Whether supplemental emission standards or other... procedures. For example, this may apply if your engine cannot operate on the specified duty cycle. In this...
40 CFR 1065.10 - Other procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... meet all applicable emission standards. (b) Our testing. These procedures generally apply for testing... importance of pursuing changes to the procedures: (i) Whether supplemental emission standards or other... procedures. For example, this may apply if your engine cannot operate on the specified duty cycle. In this...
40 CFR 1065.10 - Other procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... meet all applicable emission standards. (b) Our testing. These procedures generally apply for testing... importance of pursuing changes to the procedures: (i) Whether supplemental emission standards or other... procedures. For example, this may apply if your engine cannot operate on the specified duty cycle. In this...
40 CFR 1065.10 - Other procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... meet all applicable emission standards. (b) Our testing. These procedures generally apply for testing... importance of pursuing changes to the procedures: (i) Whether supplemental emission standards or other... procedures. For example, this may apply if your engine cannot operate on the specified duty cycle. In this...
40 CFR 1065.10 - Other procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... meet all applicable emission standards. (b) Our testing. These procedures generally apply for testing... importance of pursuing changes to the procedures: (i) Whether supplemental emission standards or other... procedures. For example, this may apply if your engine cannot operate on the specified duty cycle. In this...
40 CFR 60.335 - Test methods and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...
40 CFR 60.335 - Test methods and procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...
40 CFR 60.335 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...
40 CFR 60.335 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.335... Turbines § 60.335 Test methods and procedures. (a) The owner or operator shall conduct the performance tests required in § 60.8, using either (1) EPA Method 20, (2) ASTM D6522-00 (incorporated by reference...
Performance and Health Test Procedure for Grid Energy Storage Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baggu, Murali M; Smith, Kandler A; Friedl, Andrew
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: round-trip efficiency, standby losses, response time/accuracy, and useable energy/state of charge at different discharge/charge rates over the system's lifetime. The procedures are divided into reference performance tests, which require the system to be put in a test mode and are to be conducted in intervals, and real-time monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with littlemore » modification and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditure. Simulated results based on a detailed system simulation of a prototype system are provided as guideline.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCDANIEL, K.S.
1999-09-01
The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.
Rodríguez-Álvarez, María Xosé; Roca-Pardiñas, Javier; Cadarso-Suárez, Carmen; Tahoces, Pablo G
2018-03-01
Prior to using a diagnostic test in a routine clinical setting, the rigorous evaluation of its diagnostic accuracy is essential. The receiver-operating characteristic curve is the measure of accuracy most widely used for continuous diagnostic tests. However, the possible impact of extra information about the patient (or even the environment) on diagnostic accuracy also needs to be assessed. In this paper, we focus on an estimator for the covariate-specific receiver-operating characteristic curve based on direct regression modelling and nonparametric smoothing techniques. This approach defines the class of generalised additive models for the receiver-operating characteristic curve. The main aim of the paper is to offer new inferential procedures for testing the effect of covariates on the conditional receiver-operating characteristic curve within the above-mentioned class. Specifically, two different bootstrap-based tests are suggested to check (a) the possible effect of continuous covariates on the receiver-operating characteristic curve and (b) the presence of factor-by-curve interaction terms. The validity of the proposed bootstrap-based procedures is supported by simulations. To facilitate the application of these new procedures in practice, an R-package, known as npROCRegression, is provided and briefly described. Finally, data derived from a computer-aided diagnostic system for the automatic detection of tumour masses in breast cancer is analysed.
40 CFR 60.624 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.624 Section 60.624 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Cleaners § 60.624 Test methods and procedures. Each owner or operator of an affected facility subject to...
40 CFR 63.849 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Test methods and procedures. 63.849... Test methods and procedures. (a) The owner or operator shall use the following reference methods to determine compliance with the applicable emission limits for TF and POM emissions: (1) Method 1 in appendix...
40 CFR 63.11980 - What are the test methods and calculation procedures for process wastewater?
Code of Federal Regulations, 2013 CFR
2013-07-01
... calculation procedures for process wastewater? 63.11980 Section 63.11980 Protection of Environment... § 63.11980 What are the test methods and calculation procedures for process wastewater? (a) Performance... performance tests during worst-case operating conditions for the PVCPU when the process wastewater treatment...
40 CFR 63.11980 - What are the test methods and calculation procedures for process wastewater?
Code of Federal Regulations, 2012 CFR
2012-07-01
... calculation procedures for process wastewater? 63.11980 Section 63.11980 Protection of Environment... § 63.11980 What are the test methods and calculation procedures for process wastewater? (a) Performance... performance tests during worst-case operating conditions for the PVCPU when the process wastewater treatment...
40 CFR 63.11980 - What are the test methods and calculation procedures for process wastewater?
Code of Federal Regulations, 2014 CFR
2014-07-01
... calculation procedures for process wastewater? 63.11980 Section 63.11980 Protection of Environment... § 63.11980 What are the test methods and calculation procedures for process wastewater? (a) Performance... performance tests during worst-case operating conditions for the PVCPU when the process wastewater treatment...
78 FR 54510 - New Entrant Safety Assurance Program Operational Test
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-04
...-0298] New Entrant Safety Assurance Program Operational Test AGENCY: Federal Motor Carrier Safety...) announces an operational test of procedural changes to the New Entrant Safety Assurance Program. The operational test began in July 2013 and will be in effect for up to 12 months. It is applicable to new entrant...
DOE Office of Scientific and Technical Information (OSTI.GOV)
SMITH, S.G.
1999-08-13
This procedure checks the Enraf gauge received at Hanford is completely functional and has received no shipping damage. This procedure does not certify the gauge operation. The manufacturer certifies gauge operation. This procedure provides acceptance testing for Enraf Series 854 level gauges used to detect leaks in Hanford Waste Storage Tank annuli. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gaugemore » prior to installation package preparation.« less
242A Distributed Control System Year 2000 Acceptance Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEATS, M.C.
1999-08-31
This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct yearmore » 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.« less
40 CFR 60.664 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.664... Operations § 60.664 Test methods and procedures. (a) For the purpose of demonstrating compliance with § 60... performance test. (b) The following methods in appendix A to this part, except as provided under § 60.8(b...
40 CFR 60.664 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.664... Operations § 60.664 Test methods and procedures. (a) For the purpose of demonstrating compliance with § 60... performance test. (b) The following methods in appendix A to this part, except as provided under § 60.8(b...
40 CFR 60.664 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.664... Operations § 60.664 Test methods and procedures. (a) For the purpose of demonstrating compliance with § 60... performance test. (b) The following methods in appendix A to this part, except as provided under § 60.8(b...
Acquisition of Formal Operations: The Effects of Two Training Procedures.
ERIC Educational Resources Information Center
Rosenthal, Doreen A.
1979-01-01
A study of 11- and 12-year-old girls indicates that either of two training procedures, method training or dimension training, can aid in the transition from concrete operational to formal operational thought by promoting a hypothesis-testing attitude. (BH)
A Manual Control Test for the Detection and Deterrence of Impaired Drivers
NASA Technical Reports Server (NTRS)
Stein, A. C.; Allen, R. W.; Jex, H. R.
1984-01-01
A brief manual control test and a decision strategy were developed, laboratory tested, and field validated which provide a means for detecting human operator impairment from alcohol or other drugs. The test requires the operator to stabilize progressively unstable controlled element dynamics. Control theory and experimental data verify that the human operator's control ability on this task is constrained by basic cybernetic characteristics, and that task performance is reliably affected by impairment effects on these characteristics. Assessment of human operator control ability is determined by a statistically based decision strategy. The operator is allowed several chances to exceed a preset pass criterion. Procedures are described for setting the pass criterion based on individual ability and a desired unimpaired failure rate. These procedures were field tested with apparatus installed in automobiles that were designed to discourage drunk drivers from operating their vehicles. This test program demonstrated that the control task and detection strategy could be applied in a practical setting to screen human operators for impairment in their basic cybernetic skills.
2017-09-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS TEST AND EVALUATION OF AN IMAGE-MATCHING NAVIGATION SYSTEM FOR A UAS OPERATING IN A GPS-DENIED...INTENTIONALLY LEFT BLANK ii Approved for public release. Distribution is unlimited. TEST AND EVALUATION OF AN IMAGE-MATCHING NAVIGATION SYSTEM FOR A UAS... Evaluation Setup and Procedures 39 4.1 Test Equipment and Data Collection Procedures . . . . . . . . . . . . 39 4.2 Actual Flight Data Collection
2009-09-22
test officer). At a minimum, the CIL will be conducted at the operator level (often referred to as “field strip and clean”). More detailed...is checked before each shot is fired. Use a boresight (optical or laser ) as necessary to check alignment to the target aiming point if the barrel is...for this test should be representative of production. All components must be present, including projectile paint and markings, fuzes, any tool
NASA Technical Reports Server (NTRS)
Grantham, W. D.; Smith, P. M.; Deal, P. L.
1980-01-01
Piloted-simulator studies were conducted to determine takeoff and landing operating procedures for a supersonic cruise research transport concept that result in predicted noise levels which meet current Federal Aviation Administration (FAA) certification standards. With the use of standard FAA noise certification test procedures, the subject simulated aircraft did not meet the FAA traded-noise-level standards during takeoff and landing. However, with the use of advanced procedures, this aircraft meets the traded-noise-level standards for flight crews with average skills. The advanced takeoff procedures developed involved violating some of the current Federal Aviation Regulations (FAR), but it was not necessary to violate any FAR noise-test conditions during landing approach. Noise contours were also determined for some of the simulated takeoffs and landings in order to indicate the noise-reduction advantages of using operational procedures other than standard.
40 CFR 86.334-79 - Test procedure overview.
Code of Federal Regulations, 2012 CFR
2012-07-01
... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2 speeds which span the typical operating range of Diesel engines. These procedures require the...
40 CFR 86.334-79 - Test procedure overview.
Code of Federal Regulations, 2013 CFR
2013-07-01
... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2 speeds which span the typical operating range of Diesel engines. These procedures require the...
40 CFR 86.334-79 - Test procedure overview.
Code of Federal Regulations, 2011 CFR
2011-07-01
... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2 speeds which span the typical operating range of Diesel engines. These procedures require the...
40 CFR 1066.415 - Vehicle operation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Vehicle operation. 1066.415 Section... VEHICLE-TESTING PROCEDURES Preparing Vehicles and Running an Exhaust Emission Test § 1066.415 Vehicle operation. This section describes how to test a conventionally configured vehicle (vehicles with...
Verster, Joris C; Roth, Thomas
2011-01-01
This review discusses the methodology of the standardized on-the-road driving test and standard operation procedures to conduct the test and analyze the data. The on-the-road driving test has proven to be a sensitive and reliable method to examine driving ability after administration of central nervous system (CNS) drugs. The test is performed on a public highway in normal traffic. Subjects are instructed to drive with a steady lateral position and constant speed. Its primary parameter, the standard deviation of lateral position (SDLP), ie, an index of 'weaving', is a stable measure of driving performance with high test-retest reliability. SDLP differences from placebo are dose-dependent, and do not depend on the subject's baseline driving skills (placebo SDLP). It is important that standard operation procedures are applied to conduct the test and analyze the data in order to allow comparisons between studies from different sites.
Standardization of carbon-phenolic composite test methodology
NASA Technical Reports Server (NTRS)
Hall, W. B.
1986-01-01
The objective of this study was to evaluate the residual volatiles, filler content, and resin flow test procedures for carbon-phenolic prepreg materials. The residual volatile test procedure was rewritten with tighter procedure control which was then evaluated by round robin testing by four laboratories on the same rolls of prepreg. Results indicated that the residual volatiles test was too operator and equipment dependent to be reliable, and it was recommended that the test be discontinued. The resin flow test procedures were rewritten with tighter procedure control, and it is now considered to be an acceptable test. It was recommended that the filler content determination be made prior to prepregging.
2017-01-01
procedures and Army doctrine. During pre -IOT&E training and developmental testing , the combat developer discovered that when projectiles were fired using...Director, Operational Test and Evaluation M109 Family of Vehicles, Paladin Integrated Management (PIM) Operational Assessment of the...Initial Operational Test and Evaluation October 2011 January 2017 J. Michael Gilmore Director
Operational Control Procedures for the Activated Sludge Process: Appendix.
ERIC Educational Resources Information Center
West, Alfred W.
This document is the appendix for a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. Categories discussed include: control test data, trend charts, moving averages, semi-logarithmic plots, probability…
Inductive interference in rapid transit signaling systems. volume 2. suggested test procedures.
DOT National Transportation Integrated Search
1987-03-31
These suggested test procedures have been prepared in order to develop standard methods of analysis and testing to quantify and resolve issues of electromagnetic compatibility in rail transit operations. Electromagnetic interference, generated by rai...
Checkout and Standard Use Procedures for the Mark III Space Suit Assembly
NASA Technical Reports Server (NTRS)
Valish, Dana J.
2012-01-01
The operational pressure range is the range to which the suit can be nominally operated for manned testing. The top end of the nominal operational pressure range is equivalent to 1/2 the proof pressure. Structural pressure is 1.5 times the specified test pressure for any given test. Proof pressure is the maximum unmanned pressure to which the suit was tested by the vendor prior to delivery. The maximum allowable working pressure (MAWP) is 90% of the proof pressure. The pressure systems RVs are set to keep components below their MAWPs. If the suit is pressurized over its MAWP, the suit will be taken out of service and an in-depth inspection/review of the suit will be performed before the suit is put back in service. The procedures outlined in this document should be followed as written. However, the suit test engineer (STE) may make redline changes real-time, provided those changes are recorded in the anomaly section of the test data sheet. If technicians supporting suit build-up, check-out, and/or test execution believe that a procedure can be improved, they should notify their lead. If procedures are incorrect to the point of potentially causing hardware damage or affecting safety, bring the problem to the technician lead and/or STE s attention and stop work until a solution (temporary or permanent) is authorized. Certain steps in the procedure are marked with a DV , for Designated Verifier. The Designated Verifier for this procedure is an Advanced Space Suit Technology Development Laboratory technician, not directly involved in performing the procedural steps, who will verify that the step was performed as stated. The steps to be verified by the DV were selected based on one or more of the following criteria: the step was deemed significant in ensuring the safe performance of the test, the data recorded in the step is of specific interest in monitoring the suit system operation, or the step has a strong influence on the successful completion of test objectives. Prior to all manned test activities, Advanced Suit Test Data Sheet (TDS) Parts A-E shall be completed to verify system and team are ready for test. Advanced Suit TDS Parts F-G shall be completed at the end of the suited activity. Appendix B identifies tha appropriate Mark III suit emergency event procedures.
42 CFR 493.1256 - Standard: Control procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...
42 CFR 493.1256 - Standard: Control procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...
42 CFR 493.1256 - Standard: Control procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...
42 CFR 493.1256 - Standard: Control procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...
The purpose of this SOP is to describe the procedures for the periodic calibration and leak testing of Harvard particulate matter (PM) impactor units. This procedure applies directly to the calibration and leak testing of Harvard PM impactor units used during the Arizona NHEXAS ...
40 CFR 63.1348 - Compliance requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... standards and operating limits by using the test methods and procedures in §§ 63.1349 and 63.7. (1) PM... initial compliance with the PM emissions standards by using the test methods and procedures in § 63.1349(b... standards by using the performance test methods and procedures in § 63.1349(b)(2). The maximum 6-minute...
40 CFR 63.1348 - Compliance requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... standards and operating limits by using the test methods and procedures in §§ 63.1349 and 63.7. (1) PM... initial compliance with the PM emissions standards by using the test methods and procedures in § 63.1349(b... standards by using the performance test methods and procedures in § 63.1349(b)(2). The maximum 6-minute...
40 CFR 60.45c - Compliance and performance test methods and procedures for particulate matter.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Compliance and performance test methods and procedures for particulate matter. 60.45c Section 60.45c Protection of Environment ENVIRONMENTAL... Compliance and performance test methods and procedures for particulate matter. (a) The owner or operator of...
The purpose of this SOP is to describe the procedures for the periodic calibration and leak testing of Harvard particulate matter (PM) impactor units. This procedure applies directly to the calibration and leak testing of Harvard PM impactor units used during the Arizona NHEXAS ...
NASA Technical Reports Server (NTRS)
Newsom, B. D.
1978-01-01
A biological system proposed to restrain a monkey in the Spacelab was tested under operational conditions using typical metabolic and telemetered cardiovascular instrumentation. Instrumentation, interfaced with other electronics, and data gathering during a very active operational mission were analyzed for adequacy of procedure and success of data handling by the onboard computer.
Verster, Joris C; Roth, Thomas
2011-01-01
This review discusses the methodology of the standardized on-the-road driving test and standard operation procedures to conduct the test and analyze the data. The on-the-road driving test has proven to be a sensitive and reliable method to examine driving ability after administration of central nervous system (CNS) drugs. The test is performed on a public highway in normal traffic. Subjects are instructed to drive with a steady lateral position and constant speed. Its primary parameter, the standard deviation of lateral position (SDLP), ie, an index of ‘weaving’, is a stable measure of driving performance with high test–retest reliability. SDLP differences from placebo are dose-dependent, and do not depend on the subject’s baseline driving skills (placebo SDLP). It is important that standard operation procedures are applied to conduct the test and analyze the data in order to allow comparisons between studies from different sites. PMID:21625472
Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.
Evaluation of noise pollution level in the operating rooms of hospitals: A study in Iran.
Giv, Masoumeh Dorri; Sani, Karim Ghazikhanlou; Alizadeh, Majid; Valinejadi, Ali; Majdabadi, Hesamedin Askari
2017-06-01
Noise pollution in the operating rooms is one of the remaining challenges. Both patients and physicians are exposed to different sound levels during the operative cases, many of which can last for hours. This study aims to evaluate the noise pollution in the operating rooms during different surgical procedures. In this cross-sectional study, sound level in the operating rooms of Hamadan University-affiliated hospitals (totally 10) in Iran during different surgical procedures was measured using B&K sound meter. The gathered data were compared with national and international standards. Statistical analysis was performed using descriptive statistics and one-way ANOVA, t -test, and Pearson's correlation test. Noise pollution level at majority of surgical procedures is higher than national and international documented standards. The highest level of noise pollution is related to orthopedic procedures, and the lowest one related to laparoscopic and heart surgery procedures. The highest and lowest registered sound level during the operation was 93 and 55 dB, respectively. Sound level generated by equipments (69 ± 4.1 dB), trolley movement (66 ± 2.3 dB), and personnel conversations (64 ± 3.9 dB) are the main sources of noise. The noise pollution of operating rooms are higher than available standards. The procedure needs to be corrected for achieving the proper conditions.
40 CFR 86.158-00 - Supplemental Federal Test Procedures; overview.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Test Cycle. The test procedure for determining exhaust emissions with the air conditioner operating...) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES... the aggressive driving (US06) and air conditioning (SC03) elements of the Supplemental Federal Test...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... definitions (42 U.S.C. 6311), energy conservation standards (42 U.S.C. 6313), test procedures (42 U.S.C. 6314... operate. DOE notes that it has published an amended test procedure for commercial refrigeration equipment... amended test procedure will be required on the compliance date of any amended standards for this equipment...
40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator must conduct a performance test to measure THC and D/F emissions at the outlet of the control.../decoating kiln. The owner or operator must conduct performance tests to measure emissions of THC, D/F, HCl... operating temperature of each afterburner every 15 minutes during the THC and D/F performance tests; (ii...
40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operator must conduct a performance test to measure THC and D/F emissions at the outlet of the control.../decoating kiln. The owner or operator must conduct performance tests to measure emissions of THC, D/F, HCl... operating temperature of each afterburner every 15 minutes during the THC and D/F performance tests; (ii...
The BepiColombo/SERENA Integrated Test Campaign
NASA Astrophysics Data System (ADS)
Orsini, Stefano; De Angelis, Elisabetta; Livi, Stefano; Lichtenegger, Herbert; Barabash, Stas; Milillo, Anna; Wurz, Peter; Olivieri, Angelo; D'Arcio, Luigi; Phillips, Mark; Laky, Gunter; Wieser, Martin; Camozzi, Fabio; Di Lellis, Andrea M.; Mura, Alessandro; Lazzarotto, Francesco; Aronica, Alessandro; Rispoli, Rosanna; Verolli, Nello; Piazza, Daniele
2017-04-01
The activities related to the BepiColombo/MPO/SERENA Integrated Test (SIT, held in February 2017 by the vacuum facility at the University of Bern, CH) are presented. This campaign is a unique opportunity to test the experiment performances, with all the four flight-spare instruments of SERENA (ELENA, STROFIO, PICAM, AND MIPA, simultaneously operated by the System Control Unit (SCU), in a fully operational configuration. The test is focused on the On-Board Commanding Procedure and on the Science Operation Basic Procedure, with the goal of providing a comprehensive picture of the on-board S/W facility both in nominal and more resource demanding conditions. Such a test is a powerful tool for allowing SERENA to perform the best possible observation of the particle populations surrounding Mercury.
Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
47 CFR 87.69 - Maintenance tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 87.69 Section 87.69... Operating Requirements and Procedures Operating Requirements § 87.69 Maintenance tests. The licensee may make routine maintenance tests on equipment other than emergency locator transmitters if there is no...
Flight Test Guide (Part 61 Revised); Private Pilot Airplane.
ERIC Educational Resources Information Center
Federal Aviation Administration (DOT), Washington, DC. Flight Standards Service.
This guide provides an outline of the skills required to pass the flight test for a Private Pilot Certificate with Airplane Rating under part 61 (revised) of Federal Aviation Regulations. General procedures for flight tests are described and the following pilot operations outlined: preflight operations, airport and traffic pattern operations,…
40 CFR 63.1385 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 12 2014-07-01 2014-07-01 false Test methods and procedures. 63.1385... methods and procedures. (a) The owner or operator shall use the following methods to determine compliance with the applicable emission limits: (1) Method 1 (40 CFR part 60, appendix A) for the selection of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
HAMMERS, J.S.
1999-09-22
The purpose of the test was to verify that the AN Tank Farm Manifold Valves can be manually manipulated to the required operating position and that the electrical and visual indications accurately reflect that position. Physical locking devices were also verified to function. The Acceptance Test Procedure HNF-4642, 241-AN-A Valve Pit Manifold Valves and Position Indication was conducted between 23 June and 10 August 1999 at the 200E AN Tank Farm. The test has no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed, this had an impact on the procedure and testmore » results, ECN 653752 was written to correct the mismatch between the procedure and actual field conditions. P&ID H-14-100941 was changed via ECN-W-314-4C-120. All components, identified in the procedure, were not found to be labeled and identified as written in the procedure, temporary tags were used for operational identification. A retest of valve ANA-WT-V 318 was required because it was removed from its installed position and modified after testing was completed.« less
14 CFR 21.129 - Tests: propellers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Tests: propellers. 21.129 Section 21.129... PROCEDURES FOR PRODUCTS AND PARTS Production Under Type Certificate § 21.129 Tests: propellers. Each person... functional test to determine if it operates properly throughout the normal range of operation. ...
14 CFR 21.129 - Tests: propellers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Tests: propellers. 21.129 Section 21.129... PROCEDURES FOR PRODUCTS AND PARTS Production Under Type Certificate § 21.129 Tests: propellers. Each person... functional test to determine if it operates properly throughout the normal range of operation. ...
NASA UAS Traffic Management National Campaign Operations across Six UAS Test Sites
NASA Technical Reports Server (NTRS)
Rios, Joseph; Mulfinger, Daniel; Homola, Jeff; Venkatesan, Priya
2016-01-01
NASA's Unmanned Aircraft Systems Traffic Management research aims to develop policies, procedures, requirements, and other artifacts to inform the implementation of a future system that enables small drones to access the low altitude airspace. In this endeavor, NASA conducted a geographically diverse flight test in conjunction with the FAA's six unmanned aircraft systems Test Sites. A control center at NASA Ames Research Center autonomously managed the airspace for all participants in eight states as they flew operations (both real and simulated). The system allowed for common situational awareness across all stakeholders, kept traffic procedurally separated, offered messages to inform the participants of activity relevant to their operations. Over the 3- hour test, 102 flight operations connected to the central research platform with 17 different vehicle types and 8 distinct software client implementations while seamlessly interacting with simulated traffic.
14 CFR 34.62 - Test procedure (propulsion engines).
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Test procedure (propulsion engines). 34.62 Section 34.62 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT... (propulsion engines). (a)(1) The engine shall be tested in each of the following engine operating modes which...
40 CFR 63.6120 - What performance tests and other procedures must I use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... parameters associated with operation of the stationary combustion turbine and any emission control device... Turbines Testing and Initial Compliance Requirements § 63.6120 What performance tests and other procedures.... (e) If your stationary combustion turbine is not equipped with an oxidation catalyst, you must...
40 CFR 63.6120 - What performance tests and other procedures must I use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... parameters associated with operation of the stationary combustion turbine and any emission control device... Turbines Testing and Initial Compliance Requirements § 63.6120 What performance tests and other procedures.... (e) If your stationary combustion turbine is not equipped with an oxidation catalyst, you must...
40 CFR 63.6120 - What performance tests and other procedures must I use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... parameters associated with operation of the stationary combustion turbine and any emission control device... Turbines Testing and Initial Compliance Requirements § 63.6120 What performance tests and other procedures.... (e) If your stationary combustion turbine is not equipped with an oxidation catalyst, you must...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... definitions for key terms. DATES: These test procedures are effective on April 8, 2010. The incorporation by... as of April 8, 2010. ADDRESSES: You may review copies of all materials related to this rulemaking at... supply characteristics, operational test temperatures, instrumentation requirements, setup connections...
Environmental Test Screening Procedure
NASA Technical Reports Server (NTRS)
Zeidler, Janet
2000-01-01
This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.
14 CFR 21.129 - Tests: propellers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Tests: propellers. 21.129 Section 21.129... PROCEDURES FOR PRODUCTS AND PARTS Production Under Type Certificate Only § 21.129 Tests: propellers. Each... acceptable functional test to determine if it operates properly throughout the normal range of operation. ...
40 CFR 60.44c - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and procedures for sulfur dioxide. 60.44c Section 60.44c Protection of Environment ENVIRONMENTAL... Compliance and performance test methods and procedures for sulfur dioxide. (a) Except as provided in... operator seeks to demonstrate compliance with the fuel oil sulfur limits under § 60.42c based on shipment...
40 CFR 60.44c - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and procedures for sulfur dioxide. 60.44c Section 60.44c Protection of Environment ENVIRONMENTAL... Compliance and performance test methods and procedures for sulfur dioxide. (a) Except as provided in... operator seeks to demonstrate compliance with the fuel oil sulfur limits under § 60.42c based on shipment...
40 CFR 60.44c - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and procedures for sulfur dioxide. 60.44c Section 60.44c Protection of Environment ENVIRONMENTAL... Compliance and performance test methods and procedures for sulfur dioxide. (a) Except as provided in... operator seeks to demonstrate compliance with the fuel oil sulfur limits under § 60.42c based on shipment...
40 CFR 60.44c - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and procedures for sulfur dioxide. 60.44c Section 60.44c Protection of Environment ENVIRONMENTAL... Compliance and performance test methods and procedures for sulfur dioxide. (a) Except as provided in... operator seeks to demonstrate compliance with the fuel oil sulfur limits under § 60.42c based on shipment...
Advanced superposition methods for high speed turbopump vibration analysis
NASA Technical Reports Server (NTRS)
Nielson, C. E.; Campany, A. D.
1981-01-01
The small, high pressure Mark 48 liquid hydrogen turbopump was analyzed and dynamically tested to determine the cause of high speed vibration at an operating speed of 92,400 rpm. This approaches the design point operating speed of 95,000 rpm. The initial dynamic analysis in the design stage and subsequent further analysis of the rotor only dynamics failed to predict the vibration characteristics found during testing. An advanced procedure for dynamics analysis was used in this investigation. The procedure involves developing accurate dynamic models of the rotor assembly and casing assembly by finite element analysis. The dynamically instrumented assemblies are independently rap tested to verify the analytical models. The verified models are then combined by modal superposition techniques to develop a completed turbopump model where dynamic characteristics are determined. The results of the dynamic testing and analysis obtained are presented and methods of moving the high speed vibration characteristics to speeds above the operating range are recommended. Recommendations for use of these advanced dynamic analysis procedures during initial design phases are given.
40 CFR 60.45b - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2012 CFR
2012-07-01
... or operator obtains fuel receipts as described in § 60.49b(r). (k) The owner or operator of an...(k)(3) (when not burning coal) shall follow the applicable procedures in § 60.49b(r). [72 FR 32742... following the procedures listed below, except as provided under paragraph (d) and (k) of this section. (1...
40 CFR 60.45b - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2010 CFR
2010-07-01
... or operator obtains fuel receipts as described in § 60.49b(r). (k) The owner or operator of an...(k)(3) (when not burning coal) shall follow the applicable procedures in § 60.49b(r). [72 FR 32742... following the procedures listed below, except as provided under paragraph (d) and (k) of this section. (1...
40 CFR 60.45b - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2013 CFR
2013-07-01
... or operator obtains fuel receipts as described in § 60.49b(r). (k) The owner or operator of an...(k)(3) (when not burning coal) shall follow the applicable procedures in § 60.49b(r). [72 FR 32742... following the procedures listed below, except as provided under paragraph (d) and (k) of this section. (1...
40 CFR 60.45b - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2011 CFR
2011-07-01
... or operator obtains fuel receipts as described in § 60.49b(r). (k) The owner or operator of an...(k)(3) (when not burning coal) shall follow the applicable procedures in § 60.49b(r). [72 FR 32742... following the procedures listed below, except as provided under paragraph (d) and (k) of this section. (1...
40 CFR 60.45b - Compliance and performance test methods and procedures for sulfur dioxide.
Code of Federal Regulations, 2014 CFR
2014-07-01
... or operator obtains fuel receipts as described in § 60.49b(r). (k) The owner or operator of an...(k)(3) (when not burning coal) shall follow the applicable procedures in § 60.49b(r). [72 FR 32742... following the procedures listed below, except as provided under paragraph (d) and (k) of this section. (1...
NASA Technical Reports Server (NTRS)
Decker, T. A.; Williams, R. E.; Kuether, C. L.; Logar, N. D.; Wyman-Cornsweet, D.
1975-01-01
A computer-operated binocular vision testing device was developed as one part of a system designed for NASA to evaluate the visual function of astronauts during spaceflight. This particular device, called the Mark 3 Haploscope, employs semi-automated psychophysical test procedures to measure visual acuity, stereopsis, phoria, fixation disparity, refractive state and accommodation/convergence relationships. Test procedures are self-administered and can be used repeatedly without subject memorization. The Haploscope was designed as one module of the complete NASA Vision Testing System. However, it is capable of stand-alone operation. Moreover, the compactness and portability of the Haploscope make possible its use in a broad variety of testing environments.
49 CFR Appendix E to Part 240 - Recommended Procedures for Conducting Skill Performance Tests
Code of Federal Regulations, 2010 CFR
2010-10-01
... tailor their testing procedures to the specific operational realities. This appendix contains FRA's..., headlight? —Couple to cars at a safe speed? —Properly control in train slack and buff forces? —Properly use...
Test/score/report: Simulation techniques for automating the test process
NASA Technical Reports Server (NTRS)
Hageman, Barbara H.; Sigman, Clayton B.; Koslosky, John T.
1994-01-01
A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.
40 CFR 63.145 - Process wastewater provisions-test methods and procedures to determine compliance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Process wastewater provisions-test... Operations, and Wastewater § 63.145 Process wastewater provisions—test methods and procedures to determine... analytical method for wastewater which has that compound as a target analyte. (7) Treatment using a series of...
40 CFR 63.145 - Process wastewater provisions-test methods and procedures to determine compliance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Process wastewater provisions-test... Operations, and Wastewater § 63.145 Process wastewater provisions—test methods and procedures to determine... analytical method for wastewater which has that compound as a target analyte. (7) Treatment using a series of...
Advancing Autonomous Operations for Deep Space Vehicles
NASA Technical Reports Server (NTRS)
Haddock, Angie T.; Stetson, Howard K.
2014-01-01
Starting in Jan 2012, the Advanced Exploration Systems (AES) Autonomous Mission Operations (AMO) Project began to investigate the ability to create and execute "single button" crew initiated autonomous activities [1]. NASA Marshall Space Flight Center (MSFC) designed and built a fluid transfer hardware test-bed to use as a sub-system target for the investigations of intelligent procedures that would command and control a fluid transfer test-bed, would perform self-monitoring during fluid transfers, detect anomalies and faults, isolate the fault and recover the procedures function that was being executed, all without operator intervention. In addition to the development of intelligent procedures, the team is also exploring various methods for autonomous activity execution where a planned timeline of activities are executed autonomously and also the initial analysis of crew procedure development. This paper will detail the development of intelligent procedures for the NASA MSFC Autonomous Fluid Transfer System (AFTS) as well as the autonomous plan execution capabilities being investigated. Manned deep space missions, with extreme communication delays with Earth based assets, presents significant challenges for what the on-board procedure content will encompass as well as the planned execution of the procedures.
7 CFR 58.523 - Laboratory and quality control tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 3 2014-01-01 2014-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...
7 CFR 58.523 - Laboratory and quality control tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 3 2010-01-01 2010-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...
7 CFR 58.523 - Laboratory and quality control tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 3 2013-01-01 2013-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...
7 CFR 58.523 - Laboratory and quality control tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 3 2011-01-01 2011-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...
7 CFR 58.523 - Laboratory and quality control tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 3 2012-01-01 2012-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...
Fort Dix Remedial Investigation/Feasibility Study for MAG-1 Area
1994-01-01
by PID headspace results or odor ), samples should be diluted to bring the target compound concentrations within the instrument calibration range...Conductivity Testing ................... 2-38 2.9 ANALYTICAL PROCEDURES FOR FIELD SCREENING SAMPLES .. 2-38 2.9.1 Volatile Organic Compounds ...ANALYSIS OF VOLATILE ORGANIC COMPOUNDS BY FIELD GAS CHROMATOGRAPHY - STANDARD OPERATING PROCEDURE APPENDIX B RDX EXPLOSIVES FIELD TEST KIT PROCEDURES
PV systems photoelectric parameters determining for field conditions and real operation conditions
NASA Astrophysics Data System (ADS)
Shepovalova, Olga V.
2018-05-01
In this work, research experience and reference documentation have been generalized related to PV systems photoelectric parameters (PV array output parameters) determining. The basic method has been presented that makes it possible to determine photoelectric parameters with the state-of-the-art reliability and repeatability. This method provides an effective tool for PV systems comparison and evaluation of PV system parameters that the end-user will have in the course of its real operation for compliance with those stipulated in reference documentation. The method takes in consideration all parameters that may possibly affect photoelectric performance and that are supported by sufficiently valid procedures for their values testing. Test conditions, requirements for equipment subject to tests and test preparations have been established and the test procedure for fully equipped PV system in field tests and in real operation conditions has been described.
7 CFR 58.442 - Laboratory and quality control tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 3 2010-01-01 2010-01-01 false Laboratory and quality control tests. 58.442 Section... Service 1 Operations and Operating Procedures § 58.442 Laboratory and quality control tests. (a) Chemical... Methods or by other methods giving equivalent results. (b) Weight or volume control. Representative...
7 CFR 58.442 - Laboratory and quality control tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 3 2011-01-01 2011-01-01 false Laboratory and quality control tests. 58.442 Section... Service 1 Operations and Operating Procedures § 58.442 Laboratory and quality control tests. (a) Chemical... Methods or by other methods giving equivalent results. (b) Weight or volume control. Representative...
Utility of an airframe referenced spatial auditory display for general aviation operations
NASA Astrophysics Data System (ADS)
Naqvi, M. Hassan; Wigdahl, Alan J.; Ranaudo, Richard J.
2009-05-01
The University of Tennessee Space Institute (UTSI) completed flight testing with an airframe-referenced localized audio cueing display. The purpose was to assess its affect on pilot performance, workload, and situational awareness in two scenarios simulating single-pilot general aviation operations under instrument meteorological conditions. Each scenario consisted of 12 test procedures conducted under simulated instrument meteorological conditions, half with the cue off, and half with the cue on. Simulated aircraft malfunctions were strategically inserted at critical times during each test procedure. Ten pilots participated in the study; half flew a moderate workload scenario consisting of point to point navigation and holding pattern operations and half flew a high workload scenario consisting of non precision approaches and missed approach procedures. Flight data consisted of aircraft and navigation state parameters, NASA Task Load Index (TLX) assessments, and post-flight questionnaires. With localized cues there was slightly better pilot technical performance, a reduction in workload, and a perceived improvement in situational awareness. Results indicate that an airframe-referenced auditory display has utility and pilot acceptance in general aviation operations.
A simulation facility for testing Space Station assembly procedures
NASA Technical Reports Server (NTRS)
Hajare, Ankur R.; Wick, Daniel T.; Shehad, Nagy M.
1994-01-01
NASA plans to construct the Space Station Freedom (SSF) in one of the most hazardous environments known to mankind - space. It is of the utmost importance that the procedures to assemble and operate the SSF in orbit are both safe and effective. This paper describes a facility designed to test the integration of the telerobotic systems and to test assembly procedures using a real-world robotic arm grappling space hardware in a simulated microgravity environment.
Justifying scale type for a latent variable: Formative or reflective?
NASA Astrophysics Data System (ADS)
Liu, Hao; Bahron, Arsiah; Bagul, Awangku Hassanal Bahar Pengiran
2015-12-01
The study attempted to explore the possibilities to create a procedure at the experimental level to double confirm whether manifest variables scale type is formative or reflective. Now, the criteria of making such a decision are heavily depended on researchers' judgment at the conceptual and operational level. The study created an experimental procedure that seems could double confirm the decisions from the conceptual and operational level judgments. The experimental procedure includes the following tests, Variance Inflation Factor (VIF), Tolerance (TOL), Ridge Regression, Cronbach's alpha, Dillon-Goldstein's rho, and first and second eigenvalue. The procedure considers manifest variables' both multicollinearity and consistency. As the result, the procedure received the same judgment with the carefully established decision making at the concept and operational level.
BPM Motors in Residential Gas Furnaces: What are theSavings?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lutz, James; Franco, Victor; Lekov, Alex
2006-05-12
Residential gas furnaces contain blowers to distribute warm air. Currently, furnace blowers use either a Permanent Split Capacitor (PSC) or a Brushless Permanent Magnet (BPM) motor. Blowers account for the majority of furnace electricity consumption. Therefore, accurate determination of the blower electricity consumption is important for understanding electricity consumption of furnaces. The electricity consumption of blower motors depends on the static pressure across the blower. This paper examines both types of blower motors in non-condensing non-weatherized gas furnaces at a range of static pressures. Fan performance data is based on manufacturer product literature and laboratory tests. We use field-measured staticmore » pressure in ducts to get typical system curves to calculate how furnaces would operate in the field. We contrast this with the electricity consumption of a furnace blower operating under the DOE test procedure and manufacturer rated conditions. Furnace electricity use is also affected by operating modes that happen at the beginning and end of each furnace firing cycle. These operating modes are the pre-purge and post-purge by the draft inducer, the on-delay and off-delay of the blower, and the hot surface ignitor operation. To accurately calculate this effect, we use the number of firing cycles in a typical California house in the Central Valley of California. Cooling hours are not considered in the DOE test procedure. We also account for furnace blower use by the air conditioner and stand-by power. Overall BPM motors outperform PSC motors, but the total electricity savings are significantly less than projected using the DOE test procedure conditions. The performance gains depend on the static pressure of the household ducts, which are typically much higher than in the test procedures.« less
One-sided truncated sequential t-test: application to natural resource sampling
Gary W. Fowler; William G. O' Regan
1974-01-01
A new procedure for constructing one-sided truncated sequential t-tests and its application to natural resource sampling are described. Monte Carlo procedures were used to develop a series of one-sided truncated sequential t-tests and the associated approximations to the operating characteristic and average sample number functions. Different truncation points and...
40 CFR 1048.515 - What are the field-testing procedures?
Code of Federal Regulations, 2010 CFR
2010-07-01
... CFR part 1065, subpart J, we describe the equipment and sampling methods for testing engines in the... specify in § 1048.101(c) for any continuous sampling period of at least 120 seconds under the following ranges of operation and operating conditions: (1) Engine operation during the emission sampling period...
1973-12-18
abosrbent canister under all of the conditions in which the helmet will be expected to operate. These tests are very similar to those of Section III. B. 4... abosrbent canister will be operating but on air). Since the CO2 absorbent canister is not operating, it need not be instrumented. b. Recommended Tests -W 1
40 CFR 53.52 - Leak check test.
Code of Federal Regulations, 2014 CFR
2014-07-01
... MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent Methods for PM 2.5 or PM 10-2.5 § 53.52... to include the facility, including components, instruments, operator controls, a written procedure...
Test Operations Procedure (TOP) 5-2-521 Pyrotechnic Shock Test Procedures
2007-11-20
Clipping will produce a signal that resembles a square wave . (2) Filters are used to limit the frequency bandwidth of the signal . Low pass filters...video systems permit observation of explosive items under test. c. Facilities to perform non-destructive inspections such as x-ray, ultrasonic , magna...test. (1) Accelerometers (2) Signal Conditioners (3) Digital Recording System (4) Data Processing System with hardcopy output
Weld procedure produces quality welds for thick sections of Hastelloy-X
NASA Technical Reports Server (NTRS)
Flens, F. J.; Fletcher, C. W.; Glasier, L. F., Jr.
1967-01-01
Welding program produces premium quality, multipass welds in heavy tube sections of Hastelloy-X. It develops semiautomatic tungsten/inert gas procedures, weld wire procurement specifications material weld properties, welder-operator training, and nondestructive testing inspection techniques and procedures.
Zhong, Xiao; Wang, Pingxian; Feng, Jiayu; Hu, Wengang; Huang, Chibing
2015-01-01
This randomized controlled study compared a novel transparent urinary tract simulator with the traditional opaque urinary tract simulator as an aid for efficiently teaching urological surgical procedures. Senior medical students were tested on their understanding of urological theory before and after lectures concerning urinary system disease. The students received operative training using the transparent urinary tract simulator (experimental group, n = 80) or the J3311 opaque plastic urinary tract simulator (control, n = 80), specifically in catheterization and retrograde double-J stent implantation. The operative training was followed by a skills test and student satisfaction survey. The test scores for theory were similar between the two groups, before and after training. Students in the experimental group performed significantly better than those in the control group on the procedural skills test, and also had significantly better self-directed learning skills, analytical skills, and greater motivation to learn. During the initial step of training, the novel transparent urinary tract simulator significantly improved the efficiency of teaching urological procedural skills compared with the traditional opaque device. © 2015 S. Karger AG, Basel.
14 CFR 23.1045 - Cooling test procedures for turbine engine powered airplanes.
Code of Federal Regulations, 2014 CFR
2014-01-01
... powered airplanes. 23.1045 Section 23.1045 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... CATEGORY AIRPLANES Powerplant Cooling § 23.1045 Cooling test procedures for turbine engine powered airplanes. (a) Compliance with § 23.1041 must be shown for all phases of operation. The airplane must be...
14 CFR 23.1045 - Cooling test procedures for turbine engine powered airplanes.
Code of Federal Regulations, 2012 CFR
2012-01-01
... powered airplanes. 23.1045 Section 23.1045 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... CATEGORY AIRPLANES Powerplant Cooling § 23.1045 Cooling test procedures for turbine engine powered airplanes. (a) Compliance with § 23.1041 must be shown for all phases of operation. The airplane must be...
14 CFR 23.1045 - Cooling test procedures for turbine engine powered airplanes.
Code of Federal Regulations, 2013 CFR
2013-01-01
... powered airplanes. 23.1045 Section 23.1045 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... CATEGORY AIRPLANES Powerplant Cooling § 23.1045 Cooling test procedures for turbine engine powered airplanes. (a) Compliance with § 23.1041 must be shown for all phases of operation. The airplane must be...
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Standard 112-1996, Test Procedure for Polyphase Induction Motors and Generators, and Test Method (1) of CSA... a system, that has its own rules of procedure and management, for giving written assurance that a... operated by an entity independent of both the party seeking the written assurance and the party providing...
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Standard 112-1996, Test Procedure for Polyphase Induction Motors and Generators, and Test Method (1) of CSA... a system, that has its own rules of procedure and management, for giving written assurance that a... operated by an entity independent of both the party seeking the written assurance and the party providing...
Maine Educational Assessment (MEA) Operational Procedures, March 2005 Administration.
ERIC Educational Resources Information Center
Maine Department of Education, 2004
2004-01-01
This document is intended for use in conjunction with "Policies and Procedures for Accommodations and Alternate Assessment to the MEA," and both the "MEA Principal/Test Coordinator's Manual" and the "MEA Test Administrator's Manual." The first section, Enrollment, covers the following subjects: (1) Participation of Enrolled Students; (2) Students…
40 CFR 205.54-1 - Low speed sound emission test procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Low speed sound emission test procedures. 205.54-1 Section 205.54-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED.... Operating manuals or other literature furnished by the instrument manufacturer shall be referred to for both...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus...
40 CFR 53.52 - Leak check test.
Code of Federal Regulations, 2011 CFR
2011-07-01
... MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent Methods for PM2.5 or PM10â2.5 § 53.52... to include the facility, including components, instruments, operator controls, a written procedure...
40 CFR 53.52 - Leak check test.
Code of Federal Regulations, 2012 CFR
2012-07-01
... MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent Methods for PM2.5 or PM10â2.5 § 53.52... to include the facility, including components, instruments, operator controls, a written procedure...
40 CFR 53.52 - Leak check test.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent Methods for PM2.5 or PM10â2.5 § 53.52... to include the facility, including components, instruments, operator controls, a written procedure...
NASA Technical Reports Server (NTRS)
Beisert, Susan; Rodriggs, Michael; Moreno, Francisco; Korth, David; Gibson, Stephen; Lee, Young H.; Eagles, Donald E.
2013-01-01
Now that major assembly of the International Space Station (ISS) is complete, NASA's focus has turned to using this high fidelity in-space research testbed to not only advance fundamental science research, but also demonstrate and mature technologies and develop operational concepts that will enable future human exploration missions beyond low Earth orbit. The ISS as a Testbed for Analog Research (ISTAR) project was established to reduce risks for manned missions to exploration destinations by utilizing ISS as a high fidelity micro-g laboratory to demonstrate technologies, operations concepts, and techniques associated with crew autonomous operations. One of these focus areas is the development and execution of ISS Testbed for Analog Research (ISTAR) autonomous flight crew procedures intended to increase crew autonomy that will be required for long duration human exploration missions. Due to increasing communications delays and reduced logistics resupply, autonomous procedures are expected to help reduce crew reliance on the ground flight control team, increase crew performance, and enable the crew to become more subject-matter experts on both the exploration space vehicle systems and the scientific investigation operations that will be conducted on a long duration human space exploration mission. These tests make use of previous or ongoing projects tested in ground analogs such as Research and Technology Studies (RATS) and NASA Extreme Environment Mission Operations (NEEMO). Since the latter half of 2012, selected non-critical ISS systems crew procedures have been used to develop techniques for building ISTAR autonomous procedures, and ISS flight crews have successfully executed them without flight controller involvement. Although the main focus has been preparing for exploration, the ISS has been a beneficiary of this synergistic effort and is considering modifying additional standard ISS procedures that may increase crew efficiency, reduce operational costs, and raise the amount of crew time available for scientific research. The next phase of autonomous procedure development is expected to include payload science and human research investigations. Additionally, ISS International Partners have expressed interest in participating in this effort. The recently approved one-year crew expedition starting in 2015, consisting of one Russian and one U.S. Operating Segment (USOS) crewmember, will be used not only for long duration human research investigations but also for the testing of exploration operations concepts, including crew autonomy.
NASA Technical Reports Server (NTRS)
Perry, J. C.
1975-01-01
A series of electromagnetic compatibility (EMC) tests were conducted in May, 1975 in the Soviet Union. The purpose of the EMC tests was to determine the effects of the operating environment of the Soviet aircraft, Soyuz, upon the electrical performance of the USA's cable communications equipment located in Soyuz. The test procedures necessary to check out the cable communications test configuration in preparation for the EMC tests are presented.
Improving Small Signal Stability through Operating Point Adjustment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, Zhenyu; Zhou, Ning; Tuffner, Francis K.
2010-09-30
ModeMeter techniques for real-time small signal stability monitoring continue to mature, and more and more phasor measurements are available in power systems. It has come to the stage to bring modal information into real-time power system operation. This paper proposes to establish a procedure for Modal Analysis for Grid Operations (MANGO). Complementary to PSS’s and other traditional modulation-based control, MANGO aims to provide suggestions such as increasing generation or decreasing load for operators to mitigate low-frequency oscillations. Different from modulation-based control, the MANGO procedure proactively maintains adequate damping for all time, instead of reacting to disturbances when they occur. Effectmore » of operating points on small signal stability is presented in this paper. Implementation with existing operating procedures is discussed. Several approaches for modal sensitivity estimation are investigated to associate modal damping and operating parameters. The effectiveness of the MANGO procedure is confirmed through simulation studies of several test systems.« less
40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operator is not required to conduct an emission test for HCl. (f) Sweat furnace. Except as provided in § 63.1505(f)(1), the owner or operator must measure emissions of D/F from each sweat furnace at the outlet...
40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operator is not required to conduct an emission test for HCl. (f) Sweat furnace. Except as provided in § 63.1505(f)(1), the owner or operator must measure emissions of D/F from each sweat furnace at the outlet...
7 CFR 58.930 - Official test methods.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., GENERAL SPECIFICATIONS FOR APPROVED PLANTS AND STANDARDS FOR GRADES OF DAIRY PRODUCTS 1 General Specifications for Dairy Plants Approved for USDA Inspection and Grading Service 1 Operations and Operating Procedures § 58.930 Official test methods. (a) Chemical. Chemical analysis, except where otherwise prescribed...
7 CFR 58.930 - Official test methods.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., GENERAL SPECIFICATIONS FOR APPROVED PLANTS AND STANDARDS FOR GRADES OF DAIRY PRODUCTS 1 General Specifications for Dairy Plants Approved for USDA Inspection and Grading Service 1 Operations and Operating Procedures § 58.930 Official test methods. (a) Chemical. Chemical analysis, except where otherwise prescribed...
7 CFR 58.930 - Official test methods.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., GENERAL SPECIFICATIONS FOR APPROVED PLANTS AND STANDARDS FOR GRADES OF DAIRY PRODUCTS 1 General Specifications for Dairy Plants Approved for USDA Inspection and Grading Service 1 Operations and Operating Procedures § 58.930 Official test methods. (a) Chemical. Chemical analysis, except where otherwise prescribed...
7 CFR 58.930 - Official test methods.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., GENERAL SPECIFICATIONS FOR APPROVED PLANTS AND STANDARDS FOR GRADES OF DAIRY PRODUCTS 1 General Specifications for Dairy Plants Approved for USDA Inspection and Grading Service 1 Operations and Operating Procedures § 58.930 Official test methods. (a) Chemical. Chemical analysis, except where otherwise prescribed...
7 CFR 58.930 - Official test methods.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., GENERAL SPECIFICATIONS FOR APPROVED PLANTS AND STANDARDS FOR GRADES OF DAIRY PRODUCTS 1 General Specifications for Dairy Plants Approved for USDA Inspection and Grading Service 1 Operations and Operating Procedures § 58.930 Official test methods. (a) Chemical. Chemical analysis, except where otherwise prescribed...
Code of Federal Regulations, 2010 CFR
2010-07-01
... until the leak check is passed. Post-test leak check ≤4% of average sampling rate After sampling ** See... the test site. The sorbent media must be obtained from a source that can demonstrate the quality...-traceable calibration gas standards and reagents shall be used for the tests and procedures required under...
Direct structural parameter identification by modal test results
NASA Technical Reports Server (NTRS)
Chen, J.-C.; Kuo, C.-P.; Garba, J. A.
1983-01-01
A direct identification procedure is proposed to obtain the mass and stiffness matrices based on the test measured eigenvalues and eigenvectors. The method is based on the theory of matrix perturbation in which the correct mass and stiffness matrices are expanded in terms of analytical values plus a modification matrix. The simplicity of the procedure enables real time operation during the structural testing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... scrubber water flow rate is below the operating limits, you must follow the corrective action procedures in... compound emissions for each operating day according to the performance test procedures in § 63.7824(e); (ii... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS...
Code of Federal Regulations, 2012 CFR
2012-07-01
... scrubber water flow rate is below the operating limits, you must follow the corrective action procedures in... compound emissions for each operating day according to the performance test procedures in § 63.7824(e); (ii... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS...
Code of Federal Regulations, 2013 CFR
2013-07-01
... scrubber water flow rate is below the operating limits, you must follow the corrective action procedures in... compound emissions for each operating day according to the performance test procedures in § 63.7824(e); (ii... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS...
Code of Federal Regulations, 2011 CFR
2011-07-01
... scrubber water flow rate is below the operating limits, you must follow the corrective action procedures in... compound emissions for each operating day according to the performance test procedures in § 63.7824(e); (ii... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS...
DOE Office of Scientific and Technical Information (OSTI.GOV)
HAMMERS, J.S.
The purpose of the test was to verify that the AN Tank Farm B Pit Leak Detector components are functionally integrated and operate in accordance with engineering design specifications. The Acceptance Test Procedure HNF-4646,241-AN-B-Pit Leak Detection ANB-WT-LDSTA-231 was conducted between 26 June and 02 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure were found to be labeled and identified as writtenmore » in the procedure.« less
1998-10-01
The efficient design of a free play , 24 hour per day, operational test (OT) of an ASW search system remains a challenge to the OT community. It will...efficient, realistic, free play , 24 hour per day OT. The basic test control premise described here is to stop the test event if the time without a
NASA Technical Reports Server (NTRS)
Koppen, Sandra V.; Nguyen, Truong X.; Mielnik, John J.
2010-01-01
The NASA Langley Research Center's High Intensity Radiated Fields Laboratory has developed a capability based on the RTCA/DO-160F Section 20 guidelines for radiated electromagnetic susceptibility testing in reverberation chambers. Phase 1 of the test procedure utilizes mode-tuned stirrer techniques and E-field probe measurements to validate chamber uniformity, determines chamber loading effects, and defines a radiated susceptibility test process. The test procedure is segmented into numbered operations that are largely software controlled. This document is intended as a laboratory test reference and includes diagrams of test setups, equipment lists, as well as test results and analysis. Phase 2 of development is discussed.
NASA Astrophysics Data System (ADS)
Merkisz, J.; Lijewski, P.; Fuc, P.; Siedlecki, M.; Ziolkowski, A.
2016-09-01
The paper analyzes the exhaust emissions from farm vehicles based on research performed under field conditions (RDE) according to the NTE procedure. This analysis has shown that it is hard to meet the NTE requirements under field conditions (engine operation in the NTE zone for at least 30 seconds). Due to a very high variability of the engine conditions, the share of a valid number of NTE windows in the field test is small throughout the entire test. For this reason, a modification of the measurement and exhaust emissions calculation methodology has been proposed for farm vehicles of the NRMM group. A test has been developed composed of the following phases: trip to the operation site (paved roads) and field operations (including u-turns and maneuvering). The range of the operation time share in individual test phases has been determined. A change in the method of calculating the real exhaust emissions has also been implemented in relation to the NTE procedure.
14 CFR 125.287 - Initial and recurrent pilot testing requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., instrument approach facilities and procedures; (5) Air traffic control procedures, including IFR procedures... certificate holder; (2) For each type of airplane to be flown by the pilot, the airplane powerplant, major components and systems, major appliances, performance and operating limitations, standard and emergency...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. 197.206 Section 197.206 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Commercial Diving Operations General § 197.206...
47 CFR 80.96 - Maintenance tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 80.96 Section 80.96... tests. Stations are authorized to engage in test transmissions necessary for maintenance of the station. Test transmissions must conform to appropriate test operating procedures. ...
US Army Test and Evaluation Command, Test Operations Procedure, Gamma Ray Source Calibration
1980-03-28
SUPPLEMENTARY NOTES Safety, HTP 6-2-507 and AMCR-385-25. Related MTP’s: 8-3-171, AD 871790, 26 May 70 Radiation Detection Equipment 8-3-172, AD 728455, 1...perienced in Radiac calibration equipment and for that reason the procedures are not step-by-step but are planned to be interpreted by the operator in...is to be used by personnel trained and ex- perienced in the use of radiac calibration equipment and radiation prin- ciples. It ognnot be interpreted
Test Operations Procedure (TOP) 03-2-830A Stability Test of Indirect Fire Artillery Weapons
2013-02-20
0.01 degree 0 to 6400 mil; ± 1 mil Powder thermometer -55 to +40 °Celsius (C); ± 1 °C Muzzle velocity radar 42 to 1200 meters/second; ± 4...Gun crew 2 Geodetics personnel 1 Muzzle velocity radar operator 2 HS and regular videographer 2 Wiebel tracking radar operator 1...fire. d. Install the muzzle velocity radar at the test weapon. e. Verify test weapons boresight before and after firing each group. f
ERIC Educational Resources Information Center
Carnegie, John W.
The rise time test (along with the settleometer procedure) is used to monitor sludge behavior in the secondary clarifier of an activated sludge system. The test monitors the effect of the nitrification/denitrification process and aids the operator in determining optimum clarifier sludge detention time and, to some extent, optimum degree of…
Code of Federal Regulations, 2010 CFR
2010-07-01
... meter (100 feet) distance of the noise from locomotive and rail car operations and locomotive load cell... locomotive and rail car operations and locomotive load cell test stands. (a) Microphone positions. (1) The... measured. (b) Stationary locomotive and locomotive load cell test stand tests. (1) For stationary...
Code of Federal Regulations, 2011 CFR
2011-07-01
... meter (100 feet) distance of the noise from locomotive and rail car operations and locomotive load cell... locomotive and rail car operations and locomotive load cell test stands. (a) Microphone positions. (1) The... measured. (b) Stationary locomotive and locomotive load cell test stand tests. (1) For stationary...
Code of Federal Regulations, 2012 CFR
2012-07-01
... meter (100 feet) distance of the noise from locomotive and rail car operations and locomotive load cell... locomotive and rail car operations and locomotive load cell test stands. (a) Microphone positions. (1) The... measured. (b) Stationary locomotive and locomotive load cell test stand tests. (1) For stationary...
Code of Federal Regulations, 2014 CFR
2014-07-01
... meter (100 feet) distance of the noise from locomotive and rail car operations and locomotive load cell... locomotive and rail car operations and locomotive load cell test stands. (a) Microphone positions. (1) The... measured. (b) Stationary locomotive and locomotive load cell test stand tests. (1) For stationary...
Code of Federal Regulations, 2013 CFR
2013-07-01
... meter (100 feet) distance of the noise from locomotive and rail car operations and locomotive load cell... locomotive and rail car operations and locomotive load cell test stands. (a) Microphone positions. (1) The... measured. (b) Stationary locomotive and locomotive load cell test stand tests. (1) For stationary...
EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory
NASA Technical Reports Server (NTRS)
Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.
2012-01-01
As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.
Mobile CubeSat Command and Control: Assembly and Lessons Learned
2011-09-01
station can operate completely unmanned; if there are any problems that normal troubleshooting procedures cannot solve, the MC3 will e-mail, text, and...replaced the old 16-port switch in the Netgear product lineup and in the MC3. There is no operational change since only 4 ports in the switch are used...a Colony II satellite to reach orbit to begin testing operational principles and procedures . The AMSAT community tracks over 25 satellites that
21 CFR 606.100 - Standard operating procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... or hepatitis C virus (HCV) infection when tested under § 610.40 of this chapter, or when a blood... viral clearance procedures; (iii) To notify consignees to quarantine in-date blood and blood components... are manufactured using validated viral clearance procedures; (iv) To determine the suitability for...
Instruction manual model 600F, data transmission test set
NASA Technical Reports Server (NTRS)
1972-01-01
Information necessary for the operation and maintenance of the Model 600F Data Transmission Test Set is presented. A description is contained of the physical and functional characteristics; pertinent installation data; instructions for operating the equipment; general and detailed principles of operation; preventive and corrective maintenance procedures; and block, logic, and component layout diagrams of the equipment and its major component assemblies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chambon, Paul H.; Deter, Dean D.
2016-07-01
xiii ABSTRACT The goal of this project is to develop and evaluate powertrain test procedures that can accurately simulate real-world operating conditions, and to determine greenhouse gas (GHG) emissions of advanced medium- and heavy-duty engine and vehicle technologies. ORNL used their Vehicle System Integration Laboratory to evaluate test procedures on a stand-alone engine as well as two powertrains. Those components where subjected to various drive cycles and vehicle conditions to evaluate the validity of the results over a broad range of test conditions. Overall, more than 1000 tests were performed. The data are compiled and analyzed in this report.
Test operations procedure (TOP) 1-2-512 electromagnetic compatibility tests
NASA Astrophysics Data System (ADS)
1995-05-01
This TOP provides guidance for the planning, execution, and reporting of grounding and bonding and electromagnetic compatibility (EMC) tests of electrical, electronic, and electrochemical equipment, subsystems, and systems.
Bayesian networks for satellite payload testing
NASA Astrophysics Data System (ADS)
Przytula, Krzysztof W.; Hagen, Frank; Yung, Kar
1999-11-01
Satellite payloads are fast increasing in complexity, resulting in commensurate growth in cost of manufacturing and operation. A need exists for a software tool, which would assist engineers in production and operation of satellite systems. We have designed and implemented a software tool, which performs part of this task. The tool aids a test engineer in debugging satellite payloads during system testing. At this stage of satellite integration and testing both the tested payload and the testing equipment represent complicated systems consisting of a very large number of components and devices. When an error is detected during execution of a test procedure, the tool presents to the engineer a ranked list of potential sources of the error and a list of recommended further tests. The engineer decides this on this basis if to perform some of the recommended additional test or replace the suspect component. The tool has been installed in payload testing facility. The tool is based on Bayesian networks, a graphical method of representing uncertainty in terms of probabilistic influences. The Bayesian network was configured using detailed flow diagrams of testing procedures and block diagrams of the payload and testing hardware. The conditional and prior probability values were initially obtained from experts and refined in later stages of design. The Bayesian network provided a very informative model of the payload and testing equipment and inspired many new ideas regarding the future test procedures and testing equipment configurations. The tool is the first step in developing a family of tools for various phases of satellite integration and operation.
40 CFR Appendix I to Subparts D... - Motorcycle Noise Emission Test Procedures
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Motorcycle Noise Emission Test... valid measurements. Operating manuals or other literature furnished by the instrument manufacturer must... instrumentation is essential to obtain valid measurements. Operating manuals or other literature furnished by the...
A unified framework for weighted parametric multiple test procedures.
Xi, Dong; Glimm, Ekkehard; Maurer, Willi; Bretz, Frank
2017-09-01
We describe a general framework for weighted parametric multiple test procedures based on the closure principle. We utilize general weighting strategies that can reflect complex study objectives and include many procedures in the literature as special cases. The proposed weighted parametric tests bridge the gap between rejection rules using either adjusted significance levels or adjusted p-values. This connection is made by allowing intersection hypotheses of the underlying closed test procedure to be tested at level smaller than α. This may be also necessary to take certain study situations into account. For such cases we introduce a subclass of exact α-level parametric tests that satisfy the consonance property. When the correlation is known only for certain subsets of the test statistics, a new procedure is proposed to fully utilize this knowledge within each subset. We illustrate the proposed weighted parametric tests using a clinical trial example and conduct a simulation study to investigate its operating characteristics. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
40 CFR 160.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2014 CFR
2014-07-01
... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...
40 CFR 160.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...
40 CFR 160.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2011 CFR
2011-07-01
... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...
40 CFR 160.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2012 CFR
2012-07-01
... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...
40 CFR 160.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2013 CFR
2013-07-01
... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...
Ultrasonic interface level analyzer shop test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
STAEHR, T.W.
1999-05-24
The Royce Instrument Corporation Model 2511 Interface Level Analyzer (URSILLA) system uses an ultrasonic ranging technique (SONAR) to measure sludge depths in holding tanks. Three URSILLA instrument assemblies provided by the W-151 project are planned to be used during mixer pump testing to provide data for determining sludge mobilization effectiveness of the mixer pumps and sludge settling rates. The purpose of this test is to provide a documented means of verifying that the functional components of the three URSILLA instruments operate properly. Successful completion of this Shop Test Procedure (STP) is a prerequisite for installation in the AZ-101 tank. Themore » objective of the test is to verify the operation of the URSILLA instruments and to verify data collection using a stand alone software program.« less
10 CFR 431.242 - Test Procedures [Reserved
Code of Federal Regulations, 2011 CFR
2011-01-01
... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...
10 CFR 431.242 - Test Procedures [Reserved
Code of Federal Regulations, 2014 CFR
2014-01-01
..., automatically operated, fossil fuel-fired appliance that is designed to automatically open the flue outlet... individual, automatically operated, fossil fuel-fired appliance either in the outlet or downstream of the...
10 CFR 431.242 - Test Procedures [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...
10 CFR 431.242 - Test Procedures [Reserved
Code of Federal Regulations, 2012 CFR
2012-01-01
..., automatically operated, fossil fuel-fired appliance that is designed to automatically open the flue outlet... individual, automatically operated, fossil fuel-fired appliance either in the outlet or downstream of the...
10 CFR 431.242 - Test Procedures [Reserved
Code of Federal Regulations, 2013 CFR
2013-01-01
..., automatically operated, fossil fuel-fired appliance that is designed to automatically open the flue outlet... individual, automatically operated, fossil fuel-fired appliance either in the outlet or downstream of the...
Test results and facility description for a 40-kilowatt stirling engine
NASA Technical Reports Server (NTRS)
Kelm, G. G.; Cairelli, J. E.; Walter, R. J.
1981-01-01
A 40 kilowatt Stirling engine, its test support facilities, and the experimental procedures used for these tests are described. Operating experience with the engine is discussed, and some initial test results are presented
XV-15 Low-Noise Terminal Area Operations Testing
NASA Technical Reports Server (NTRS)
Edwards, B. D.
1998-01-01
Test procedures related to XV-15 noise tests conducted by NASA-Langley and Bell Helicopter Textron, Inc. are discussed. The tests. which took place during October and November 1995, near Waxahachie, Texas, documented the noise signature of the XV-15 tilt-rotor aircraft at a wide variety of flight conditions. The stated objectives were to: -provide a comprehensive acoustic database for NASA and U.S. Industry -validate noise prediction methodologies, and -develop and demonstrate low-noise flight profiles. The test consisted of two distinct phases. Phase 1 provided an acoustic database for validating analytical noise prediction techniques; Phase 2 directly measured noise contour information at a broad range of operating profiles, with emphasis on minimizing 'approach' noise. This report is limited to a documentation of the test procedures, flight conditions, microphone locations, meteorological conditions, and test personnel used in the test. The acoustic results are not included.
Operational NDT simulator, towards human factors integration in simulated probability of detection
NASA Astrophysics Data System (ADS)
Rodat, Damien; Guibert, Frank; Dominguez, Nicolas; Calmon, Pierre
2017-02-01
In the aeronautic industry, the performance demonstration of Non-Destructive Testing (NDT) procedures relies on Probability Of Detection (POD) analyses. This statistical approach measures the ability of the procedure to detect a flaw with regard to one of its characteristic dimensions. The inspection chain is evaluated as a whole, including equipment configuration, probe effciency but also operator manipulations. Traditionally, a POD study requires an expensive campaign during which several operators apply the procedure on a large set of representative samples. Recently, new perspectives for the POD estimation have been introduced using NDT simulation to generate data. However, these approaches do not offer straightforward solutions to take the operator into account. The simulation of human factors, including cognitive aspects, often raises questions. To address these diffculties, we propose a concept of operational NDT simulator [1]. This work presents the first steps in the implementation of such simulator for ultrasound phased array inspection of composite parts containing Flat Bottom Holes (FBHs). The final system will look like a classical ultrasound testing equipment with a single exception: the displayed signals will be synthesized. Our hardware (ultrasound acquisition card, 3D position tracker) and software (position analysis, inspection scenario, synchronization, simulations) environments are developed as a bench to test the meta-modeling techniques able to provide fast-simulated realistic ultra-sound signals. The results presented here are obtained by on-the-fly merging of real and simulated signals. They confirm the feasibility of our approach: the replacement of real signals by purely simulated ones has been unnoticed by operators. We believe this simulator is a great prospect for POD evaluation including human factors, and may also find applications for training or procedure set-up.
Medical operations: Crew surgeon's report. [in Skylab simulation test
NASA Technical Reports Server (NTRS)
Ross, C. E.
1973-01-01
To assure the safety and well being of the Skylab environment simulation crewmembers it was necessary to develop a medical safety plan with emergency procedures. All medical and nonmedical test and operations personnel, except those specifically exempted, were required to meet the medical standards and proficiency levels as established. Implemented programs included health care of the test crew and their families, occupational medical services for chamber operating personnel, clinical laboratory support and hypobaric and other emergency support.
Janß, Armin; Thorn, Johannes; Schmitz, Malte; Mildner, Alexander; Dell'Anna-Pudlik, Jasmin; Leucker, Martin; Radermacher, Klaus
2018-02-23
Nowadays, only closed and proprietary integrated operating room systems (IORS) from big manufacturers are available on the market. Hence, the interconnection of components from third-party vendors is only possible with increased time and costs. In the context of the German Federal Ministry of Education and Research (BMBF)-funded project OR.NET (2012-2016), the open integration of medical devices from different manufacturers was addressed. An integrated operating theater based on the open communication standard IEEE 11073 shall give clinical operators the opportunity to choose medical devices independently of the manufacturer. This approach would be advantageous especially for hospital operators and small- and medium-sized enterprises (SME) of medical devices. Actual standards and concepts regarding technical feasibility and the approval process do not cope with the requirements for a modular integration of medical devices in the operating room (OR), based on an open communication standard. Therefore, innovative approval strategies and corresponding certification and test procedures, which cover actual legal and normative standards, have to be developed in order to support the future risk management and the usability engineering process of open integrated medical devices in the OR. The use of standardized device and service profiles and a three-step testing procedure, including conformity, interoperability and integration tests are described in this paper and shall support the manufacturers to integrate their medical devices without disclosing the medical devices' risk analysis and related confidential expertise or proprietary information.
Luthra, Suvitesh; Ramady, Omar; Monge, Mary; Fitzsimons, Michael G; Kaleta, Terry R; Sundt, Thoralf M
2015-06-01
Markers of operation room (OR) efficiency in cardiac surgery are focused on "knife to skin" and "start time tardiness." These do not evaluate the middle and later parts of the cardiac surgical pathway. The purpose of this analysis was to evaluate knife to skin time as an efficiency marker in cardiac surgery. We looked at knife to skin time, procedure time, and transfer times in the cardiac operational pathway for their correlation with predefined indices of operational efficiency (Index of Operation Efficiency - InOE, Surgical Index of Operational Efficiency - sInOE). A regression analysis was performed to test the goodness of fit of the regression curves estimated for InOE relative to the times on the operational pathway. The mean knife to skin time was 90.6 ± 13 minutes (23% of total OR time). The mean procedure time was 282 ± 123 minutes (71% of total OR time). Utilization efficiencies were highest for aortic valve replacement and coronary artery bypass grafting and least for complex aortic procedures. There were no significant procedure-specific or team-specific differences for standard procedures. Procedure times correlated the strongest with InOE (r = -0.98, p < 0.01). Compared to procedure times, knife to skin is not as strong an indicator of efficiency. A statistically significant linear dependence on InOE was observed with "procedure times" only. Procedure times are a better marker of OR efficiency than knife to skin in cardiac cases. Strategies to increase OR utilization and efficiency should address procedure times in addition to knife to skin times. © 2015 Wiley Periodicals, Inc.
Desert Research and Technology Studies 2005 Report
NASA Technical Reports Server (NTRS)
Ross, Amy J.; Kosmo, Joseph J.; Janoiko, Barbara A.; Bernard, Craig; Splawn, Keith; Eppler, Dean B.
2006-01-01
During the first two weeks of September 2005, the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Advanced Extravehicular Activity (AEVA) team led the field test portion of the 2005 Research and Technology Studies (RATS). The Desert RATS field test activity is the culmination of the various individual science and advanced engineering discipline areas year-long technology and operations development efforts into a coordinated field test demonstration under representative (analog) planetary surface terrain conditions. The purpose of the RATS is to drive out preliminary exploration concept of operations EVA system requirements by providing hands-on experience with simulated planetary surface exploration extravehicular activity (EVA) hardware and procedures. The RATS activities also are of significant importance in helping to develop the necessary levels of technical skills and experience for the next generation of engineers, scientists, technicians, and astronauts who will be responsible for realizing the goals of the Constellation Program. The 2005 Desert RATS was the eighth RATS field test and was the most systems-oriented, integrated field test to date with participants from NASA field centers, the United States Geologic Survey (USGS), industry partners, and research institutes. Each week of the test, the 2005 RATS addressed specific sets of objectives. The first week focused on the performance of surface science astro-biological sampling operations, including planetary protection considerations and procedures. The second week supported evaluation of the Science, Crew, Operations, and Utility Testbed (SCOUT) proto-type rover and its sub-systems. Throughout the duration of the field test, the Communications, Avionics, and Infomatics pack (CAI-pack) was tested. This year the CAI-pack served to provide information on surface navigation, science sample collection procedures, and EVA timeline awareness. Additionally, 2005 was the first year since the Apollo program that two pressurized suited test subjects have worked together simultaneously. Another first was the demonstration of recharge of cryogenic life support systems while in-use by the suited test subjects. The recharge capability allowed the simulated EVA test duration to be doubled, facilitating SCOUT proto-type rover testing. This paper summarizes Desert RATS 2005 test hardware, detailed test objectives, test operations and test results.
Thermal Comfort Testing for Vehicle Operator/Passenger Workspaces (Truck Cabs)
2007-10-09
This TOP describes the procedure to quantify the thermal comfort of a truck cab in temperatures as hot and humid as possible. Facilities, instrumentation, health and safety, test conditions, test procedures, data required, and presentation of data will be discussed in this TOP. This TOP will supplement the following TOPs: TOP 1-1-006, TOP 2-2-508, TOP 2-4-001, and TOP 10-1-003.
Standard Procedures for Air Force Operational Test and Evaluation. Volume I. Appendices
1974-10-01
Participates in selected tests data for assessment of suitability Participates in the intepretation of and effectiveness, as practicable tet results...selected tests Interprels test results Inteprets test resultst ReplRorts to CNO the results of the "eports independent operational TI’ECIIEVAL assessment" v... films , lists, tapes, drawings, specifications. parts breakdowns, ctc. RAW DATA; ’The original form of data at the time it was recorded. DATA
Science Support Room Operations During Desert RATS 2009
NASA Technical Reports Server (NTRS)
Lofgren, G. E.; Horz, F.; Bell, M. S.; Cohen, B. A.; Eppler,D. B.; Evans, C. a.; Hodges, K. V.; Hynek, B. M.; Gruener, J. E.; Kring, D. A.;
2010-01-01
NASA's Desert Research and Technology Studies (D-RATS) field test is a demonstration that combines operations development, technology advances and science in analog planetary surface conditions. The focus is testing preliminary operational concepts for extravehicular activity (EVA) systems by providing hands-on experience with simulated surface operations and EVA hardware and procedures. The DRATS activities also develop technical skills and experience for the engineers, scientists, technicians, and astronauts responsible for realizing the goals of the Lunar Surface Systems Program. The 2009 test is the twelfth for the D-RATS team.
The Centrifuge Facility Life Sciences Glovebox configuration study
NASA Technical Reports Server (NTRS)
Sun, Sidney C.; Goulart, Carla V.
1992-01-01
Crew operations associated with nonhuman life sciences research on Space Station Freedom will be conducted in the Life Sciences Glovebox, whose enclosed work volume must accommodate numerous life science procedures. Two candidate Glovebox work volume concepts have been developed: one in which two operators work side-by-side, and another that conforms to the reach envelope of a single operator. Six test volunteers tested the concepts according to preestablished operational criteria. The wrap-around, single-operator concept has been judged the superior system.
ERIC Educational Resources Information Center
Old West Regional Commission, Billings, MT.
To evaluate and test the effectiveness of the "Procedures Manual for Assisting the Socioeconomic Impact of the Construction and Operation of Coal Utilization Facilities in the Old West Region," an impact study of a proposed electric generating station on the Laramie River near Wheatland, Wyoming, identifies difficulties encountered in…
Development and testing of a new disposable sterile device for labelling white blood cells.
Signore, A; Glaudemans, A W J M; Malviya, G; Lazzeri, E; Prandini, N; Viglietti, A L; De Vries, E F J; Dierckx, R A J O
2012-08-01
White blood cell (WBC) labelling requires isolation of cells from patient's blood under sterile conditions using sterile materials, buffers and disposables under good manufacturing practice (GMP) conditions. Till now, this limited the use of white blood cell scintigraphy (WBC-S) only to well equipped laboratories with trained personnel. We invented, developed and tested a disposable, sterile, closed device for blood manipulation, WBC purification and radionuclide labelling without exposing patient's blood and the operator to contamination risks. This device prototype and a final industrialized device (Leukokit®) were tested for WBC labelling and compared to standard procedure. Leukokit® was also tested in an international multi-centre study for easiness of WBC purification and labelling. On the device prototype we tested in parallel, with blood samples from 7 volunteers, the labelling procedure compared to the standard procedure of the International Society of Radiolabeled Blood Elements (ISORBE) consensus protocol with respect to cell recovery, labelling efficiency (LE), cell viability (Trypan Blue test) and sterility (haemoculture). On the final Leukokit® we tested the biocompatibility of all components, and again the LE, erythro-sedimentation rate, cell viability, sterility and apyrogenicity. ACD-A, HES and PBS provided by Leukokit® were also compared to Heparin, Dextran and autologous plasma, respectively. In 4 samples, we tested the chemotactic activity of purified WBC against 1 mg/ml of lipopolysaccharide (LPS) and chemotaxis of 99mTc-HMPAO-labelled WBC (925 MBq) was compared to that of unlabelled cells. For the multi-centre study, 70 labellings were performed with the Leukokit® by 9 expert operators and 3 beginners from five centers using blood from both patients and volunteers. Finally, Media-Fill tests were performed by 3 operators on two different days (11 procedures) by replacing blood and kit reagents with bacterial culture media (Tryptic Soy Broth) and testing sterility of aliquots of the medium at the end of procedure. Tests performed with the prototype showed no significant differences with the standard procedure but a faster and safer approach. Tests performed with the final Leukokit® confirmed full biocompatibility, sterility and apyrogenicity of all reagents and plastic ware. Average WBC recovery with Leukokit® was comparable to that of the ISORBE protocol (117x106±24x106 vs. 132x106±29x106 cells, P=not significant). No differences in red blood cells and platelet content were observed. LE was 82% ± 3% for Leukokit® and 65±5% for control (P=0.0003) being PBS vs autologous plasma the main reason of such difference. Cell viability was always >99.9% in both conditions. Chemotactic tests showed no differences between all Leukokit® samples and controls. Haemocultures and Media-Fill tests were always sterile. The procedure was well accepted by expert operators and beginners, with a very fast learning curve (confidence after 2±2 labellings). The invented device offers high level of protection to operators and patients. The derived Leukokit® is safe and easy to use, and gives a high LE of WBC without affecting cell viability and function. Being a registered closed, sterile medical device, it may allow easier and faster WBC labelling that is not limited to only well equipped laboratories. Also simultaneously labelling of multiple patients is possible.
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
Analyzing the test process using structural coverage
NASA Technical Reports Server (NTRS)
Ramsey, James; Basili, Victor R.
1985-01-01
A large, commercially developed FORTRAN program was modified to produce structural coverage metrics. The modified program was executed on a set of functionally generated acceptance tests and a large sample of operational usage cases. The resulting structural coverage metrics are combined with fault and error data to evaluate structural coverage. It was shown that in the software environment the functionally generated tests seem to be a good approximation of operational use. The relative proportions of the exercised statement subclasses change as the structural coverage of the program increases. A method was also proposed for evaluating if two sets of input data exercise a program in a similar manner. Evidence was provided that implies that in this environment, faults revealed in a procedure are independent of the number of times the procedure is executed and that it may be reasonable to use procedure coverage in software models that use statement coverage. Finally, the evidence suggests that it may be possible to use structural coverage to aid in the management of the acceptance test processed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oxstrand, Johanna; Le Blanc, Katya L.; Bly, Aaron
The paper-based procedures currently used for nearly all activities in the commercial nuclear power industry have a long history of ensuring safe operation of the plants. However, there is potential to greatly increase efficiency and safety by improving how the human operator interacts with the procedures. One way to achieve these improvements is through the use of computer-based procedures (CBPs). A CBP system offers a vast variety of improvements, such as context driven job aids, integrated human performance tools (e.g., placekeeping, correct component verification, etc.), and dynamic step presentation. The latter means that the CBP system could only display relevantmore » steps based on operating mode, plant status, and the task at hand. A dynamic presentation of the procedure (also known as context-sensitive procedures) will guide the operator down the path of relevant steps based on the current conditions. This feature will reduce the operator’s workload and inherently reduce the risk of incorrectly marking a step as not applicable and the risk of incorrectly performing a step that should be marked as not applicable. The research team at the Idaho National Laboratory has developed a prototype CBP system for field workers, which has been evaluated from a human factors and usability perspective in four laboratory studies. Based on the results from each study revisions were made to the CBP system. However, a crucial step to get the end users' (e.g., auxiliary operators, maintenance technicians, etc.) acceptance is to put the system in their hands and let them use it as a part of their everyday work activities. In the spring 2014 the first field evaluation of the INL CBP system was conducted at a nuclear power plant. Auxiliary operators conduct a functional test of one out of three backup air compressors each week. During the field evaluation activity, one auxiliary operator conducted the test with the paper-based procedure while a second auxiliary operator followed along with the computer-based procedure. After each conducted functional test the operators were asked a series of questions designed to provide feedback on the feasibility to use a CBP system in the plant and the general user experience of the CBP system. This paper will describe the field evaluation and its results in detail. For example, the result shows that the context driven job aids and the incorporated human performance tools are much liked by the auxiliary operators. The paper will describe and present initial findings from a second field evaluation conducted at second nuclear utility. For this field evaluation a preventive maintenance work order for the HVAC system was used. In addition, there will be a description of the method and objective of two field evaluations planned to be conducted late 2014 or early 2015.« less
14 CFR 27.1045 - Cooling test procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... during which the temperatures are stabilized. (c) Duration of test. For each stage of flight the tests...; or (3) An operating limitation is reached. [Doc. No. 5074, 29 FR 15695, Nov. 24, 1964, as amended by...
NaK loop testing of thermoelectric converter modules (SNAP program)
NASA Technical Reports Server (NTRS)
Johnson, J. L.
1973-01-01
The history of testing of compact tubular modules in flowing NaK loops is summarized. Test procedures, data handling, and instrument calibration are discussed. Also included is descriptive information of the test facilities, operational problems encountered, and some recommendations for testing.
The procedure for isolation of neoplasms on the retina of the eye
NASA Astrophysics Data System (ADS)
Komkova, S. V.
2018-01-01
In operation, a computer diagnostic procedure on the human retina neoplasms. The use of this technique in medical institutions in the operation of the ophthalmic practitioner allows earlv detection of the disease, at periodic inspection of a pictorial pattern of disease progression. The test procedure is performed on a set of real human retinal photographs taken from international STARE database with known diagnoses. Given the numerous experiments which show the possibility of using this technique, developed on the basis of the diagnostic system in a doctor’s office-ophthalmic.
Benchmarking an operational procedure for rapid flood mapping and risk assessment in Europe
NASA Astrophysics Data System (ADS)
Dottori, Francesco; Salamon, Peter; Kalas, Milan; Bianchi, Alessandra; Feyen, Luc
2016-04-01
The development of real-time methods for rapid flood mapping and risk assessment is crucial to improve emergency response and mitigate flood impacts. This work describes the benchmarking of an operational procedure for rapid flood risk assessment based on the flood predictions issued by the European Flood Awareness System (EFAS). The daily forecasts produced for the major European river networks are translated into event-based flood hazard maps using a large map catalogue derived from high-resolution hydrodynamic simulations, based on the hydro-meteorological dataset of EFAS. Flood hazard maps are then combined with exposure and vulnerability information, and the impacts of the forecasted flood events are evaluated in near real-time in terms of flood prone areas, potential economic damage, affected population, infrastructures and cities. An extensive testing of the operational procedure is carried out using the catastrophic floods of May 2014 in Bosnia-Herzegovina, Croatia and Serbia. The reliability of the flood mapping methodology is tested against satellite-derived flood footprints, while ground-based estimations of economic damage and affected population is compared against modelled estimates. We evaluated the skill of flood hazard and risk estimations derived from EFAS flood forecasts with different lead times and combinations. The assessment includes a comparison of several alternative approaches to produce and present the information content, in order to meet the requests of EFAS users. The tests provided good results and showed the potential of the developed real-time operational procedure in helping emergency response and management.
Ground Operations Aerospace Language (GOAL)
NASA Technical Reports Server (NTRS)
1973-01-01
GOAL, is a test engineer oriented language designed to be used to standardize procedure terminology and as the test programming language to be used for ground checkout operations in a space vehicle launch environment. The material presented concerning GOAL includes: (1) a historical review, (2) development objectives and requirements, (3) language scope and format, and (4) language capabilities.
40 CFR 792.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2011 CFR
2011-07-01
... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...
40 CFR 792.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2014 CFR
2014-07-01
... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...
40 CFR 792.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2013 CFR
2013-07-01
... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...
40 CFR 792.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2012 CFR
2012-07-01
... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...
Airborne Data Link Operational Evaluation Test Plan
DOT National Transportation Integrated Search
1993-08-01
This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...
NASA Technical Reports Server (NTRS)
1976-01-01
Full size Tug LO2 and LH2 tank configurations were defined, based on selected tank geometries. These configurations were then locally modeled for computer stress analysis. A large subscale test tank, representing the selected Tug LO2 tank, was designed and analyzed. This tank was fabricated using procedures which represented production operations. An evaluation test program was outlined and a test procedure defined. The necessary test hardware was also fabricated.
Safe Operation of Mobile Unmanned Ground Vehicle (UGV) Systems
2010-07-13
vehicle could go during uncommanded movement and full throttle acceleration. 4. TEST PROCEDURES. 4.1 Vehicle Subsystem Tests. These tests identify...time required to go from straight ahead to full deflection in one direction. (sec) i. Observations on ability of the remote operator to maintain...were well below the lateral acceleration limits of the vehicle resulting in very predictable handling traits. The primary concern , albeit subjective
Test Operations Procedure (TOP) 02-1-100 Anthropomorphic Test Device Operation and Setup
2016-02-09
using the Data Acquisition for Anthropomorphic Test Devices (D4D) in vehicle vulnerability testing. The D4D is an onboard data acquisition system ( DAS ...for Anthropomorphic Test Devices (D4D)** in vehicle vulnerability testing. The D4D is an onboard data acquisition system ( DAS ) that is intended for...use with the Hybrid II/III ATD’s. The D4D was developed to augment the existing DAS system, the legacy Versatile Information Systems Integrated On
Analytical control test plan and microbiological methods for the water recovery test
NASA Technical Reports Server (NTRS)
Traweek, M. S. (Editor); Tatara, J. D. (Editor)
1994-01-01
Qualitative and quantitative laboratory results are important to the decision-making process. In some cases, they may represent the only basis for deciding between two or more given options or processes. Therefore, it is essential that handling of laboratory samples and analytical operations employed are performed at a deliberate level of conscientious effort. Reporting erroneous results can lead to faulty interpretations and result in misinformed decisions. This document provides analytical control specifications which will govern future test procedures related to all Water Recovery Test (WRT) Phase 3 activities to be conducted at the National Aeronautics and Space Administration/Marshall Space Flight Center (NASA/MSFC). This document addresses the process which will be used to verify analytical data generated throughout the test period, and to identify responsibilities of key personnel and participating laboratories, the chains of communication to be followed, and ensure that approved methodology and procedures are used during WRT activities. This document does not outline specifics, but provides a minimum guideline by which sampling protocols, analysis methodologies, test site operations, and laboratory operations should be developed.
Operational Based Vision Assessment Cone Contrast Test: Description and Operation
2016-06-02
Jun 2016. Report contains color . 14. ABSTRACT The work detailed in this report was conducted by the Operational Based Vision Assessment (OBVA...currently used by the Air Force for aircrew color vision screening. The new OBVA CCT is differentiated from the Rabin device primarily by hardware...test procedures, and analysis techniques. Like the Rabin CCT, the OBVA CCT uses colors that selectively stimulate the cone photoreceptors of the
Aircraft Mishap Exercise at SLF
2018-02-14
NASA Kennedy Space Center's Flight Operations team reviews procedures before beginning a rehearsal of a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
NASA Technical Reports Server (NTRS)
1975-01-01
A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.
Levy, AnneMarie; Limebeer, Cheryl L.; Ferdinand, Justin; Shillingford, Ucal; Parker, Linda A.; Leri, Francesco
2014-01-01
This paper describes a novel method for studying the bio-behavioral basis of addiction to food. This method combines the surgical component of taste reactivity with the behavioral aspects of operant self-administration of drugs. Under very brief general anaesthesia, rats are implanted with an intraoral (IO) cannula that allows delivery of test solutions directly in the oral cavity. Animals are then tested in operant self-administration chambers whereby they can press a lever to receive IO infusions of test solutions. IO self-administration has several advantages over experimental procedures that involve drinking a solution from a spout or operant responding for solid pellets or solutions delivered in a receptacle. Here, we show that IO self-administration can be employed to study self-administration of high fructose corn syrup (HFCS). Rats were first tested for self-administration on a progressive ratio (PR) schedule, which assesses the maximum amount of operant behavior that will be emitted for different concentrations of HFCS (i.e. 8%, 25%, and 50%). Following this test, rats self-administered these concentrations on a continuous schedule of reinforcement (i.e. one infusion for each lever press) for 10 consecutive days (1 session/day; each lasting 3 hr), and then they were retested on the PR schedule. On the continuous reinforcement schedule, rats took fewer infusions of higher concentrations, although the lowest concentration of HFCS (8%) maintained more variable self-administration. Furthermore, the PR tests revealed that 8% had lower reinforcing value than 25% and 50%. These results indicate that IO self-administration can be employed to study acquisition and maintenance of responding for sweet solutions. The sensitivity of the operant response to differences in concentration and schedule of reinforcement makes IO self-administration an ideal procedure to investigate the neurobiology of voluntary intake of sweets. PMID:24561923
Adaptive graph-based multiple testing procedures
Klinglmueller, Florian; Posch, Martin; Koenig, Franz
2016-01-01
Multiple testing procedures defined by directed, weighted graphs have recently been proposed as an intuitive visual tool for constructing multiple testing strategies that reflect the often complex contextual relations between hypotheses in clinical trials. Many well-known sequentially rejective tests, such as (parallel) gatekeeping tests or hierarchical testing procedures are special cases of the graph based tests. We generalize these graph-based multiple testing procedures to adaptive trial designs with an interim analysis. These designs permit mid-trial design modifications based on unblinded interim data as well as external information, while providing strong family wise error rate control. To maintain the familywise error rate, it is not required to prespecify the adaption rule in detail. Because the adaptive test does not require knowledge of the multivariate distribution of test statistics, it is applicable in a wide range of scenarios including trials with multiple treatment comparisons, endpoints or subgroups, or combinations thereof. Examples of adaptations are dropping of treatment arms, selection of subpopulations, and sample size reassessment. If, in the interim analysis, it is decided to continue the trial as planned, the adaptive test reduces to the originally planned multiple testing procedure. Only if adaptations are actually implemented, an adjusted test needs to be applied. The procedure is illustrated with a case study and its operating characteristics are investigated by simulations. PMID:25319733
Track/train dynamics test procedure transfer function test
NASA Technical Reports Server (NTRS)
Vigil, R. A.
1975-01-01
A transfer function vibration test was made on an 80 ton open hopper freight car in an effort to obtain validation data on the car's nonlinear elastic model. Test configuration, handling, test facilities, test operations, and data acquisition/reduction activities necessary to meet the conditions of test requirements are given.
Basques, Bryce A; Golinvaux, Nicholas S; Bohl, Daniel D; Yacob, Alem; Toy, Jason O; Varthi, Arya G; Grauer, Jonathan N
2014-10-15
Retrospective database review. To evaluate whether microscope use during spine procedures is associated with increased operating room times or increased risk of infection. Operating microscopes are commonly used in spine procedures. It is debated whether the use of an operating microscope increases operating room time or confers increased risk of infection. The American College of Surgeons National Surgical Quality Improvement Program database, which includes data from more than 370 participating hospitals, was used to identify patients undergoing elective spinal procedures with and without the use of an operating microscope for the years 2011 and 2012. Bivariate and multivariate linear regressions were used to test the association between microscope use and operating room times. Bivariate and multivariate logistic regressions were similarly conducted to test the association between microscope use and infection occurrence within 30 days of surgery. A total of 23,670 elective spine procedures were identified, of which 2226 (9.4%) used an operating microscope. The average patient age was 55.1±14.4 years. The average operative time (incision to closure) was 125.7±82.0 minutes.Microscope use was associated with minor increases in preoperative room time (+2.9 min, P=0.013), operative time (+13.2 min, P<0.001), and total room time (+18.6 min, P<0.001) on multivariate analysis.A total of 328 (1.4%) patients had an infection within 30 days of surgery. Multivariate analysis revealed no significant difference between the microscope and nonmicroscope groups for occurrence of any infection, superficial surgical site infection, deep surgical site infection, organ space infection, or sepsis/septic shock, regardless of surgery type. We did not find operating room times or infection risk to be significant deterrents for use of an operating microscope during spine surgery. 3.
Basques, Bryce A.; Golinvaux, Nicholas S.; Bohl, Daniel D.; Yacob, Alem; Toy, Jason O.; Varthi, Arya G.; Grauer, Jonathan N.
2014-01-01
Study Design Retrospective database review. Objective To evaluate whether microscope use during spine procedures is associated with increased operating room times or increased risk of infection. Summary of Background Data Operating microscopes are commonly used in spine procedures. It is debated whether the use of an operating microscope increases operating room time or confers increased risk of infection. Methods The American College of Surgeons National Surgical Quality Improvement Program (ACS-NSQIP) database, which includes data from over 370 participating hospitals, was used to identify patients undergoing elective spinal procedures with and without an operating microscope for the years 2011 and 2012. Bivariate and multivariate linear regressions were used to test the association between microscope use and operating room times. Bivariate and multivariate logistic regressions were similarly conducted to test the association between microscope use and infection occurrence within 30 days of surgery. Results A total of 23,670 elective spine procedures were identified, of which 2,226 (9.4%) used an operating microscope. The average patient age was 55.1 ± 14.4 years. The average operative time (incision to closure) was 125.7 ± 82.0 minutes. Microscope use was associated with minor increases in preoperative room time (+2.9 minutes, p=0.013), operative time (+13.2 minutes, p<0.001), and total room time (+18.6 minutes, p<0.001) on multivariate analysis. A total of 328 (1.4%) patients had an infection within 30 days of surgery. Multivariate analysis revealed no significant difference between the microscope and non-microscope groups for occurrence of any infection, superficial surgical site infection (SSI), deep SSI, organ space infection, or sepsis/septic shock, regardless of surgery type. Conclusions We did not find operating room times or infection risk to be significant deterrents for use of an operating microscope during spine surgery. PMID:25188600
ERIC Educational Resources Information Center
Osman, Magda; Wilkinson, Leonora; Beigi, Mazda; Castaneda, Cristina Sanchez; Jahanshahi, Marjan
2008-01-01
The striatum is considered to mediate some forms of procedural learning. Complex dynamic control (CDC) tasks involve an individual having to make a series of sequential decisions to achieve a specific outcome (e.g. learning to operate and control a car), and they involve procedural learning. The aim of this study was to test the hypothesis that…
Candidate CDTI procedures study
NASA Technical Reports Server (NTRS)
Ace, R. E.
1981-01-01
A concept with potential for increasing airspace capacity by involving the pilot in the separation control loop is discussed. Some candidate options are presented. Both enroute and terminal area procedures are considered and, in many cases, a technologically advanced Air Traffic Control structure is assumed. Minimum display characteristics recommended for each of the described procedures are presented. Recommended sequencing of the operational testing of each of the candidate procedures is presented.
Operative shortening of the sling as a second-line treatment after TVT failure
Matuszewski, Marcin; Michajłowski, Jerzy; Krajka, Kazimierz
2011-01-01
Introduction Stress urinary incontinence (SUI) is defined as an involuntary loss of urine during physical exertion, sneezing, coughing, laughing, or other activities that put pressure on the bladder. In some cases, recurrent or persistent SUI after sling operations may be caused by too loose placement of the sling. In the current study, we describe our method of shortening of the sling as a second-line treatment of tension-free vaginal tape (TVT) failure. Materials and methods Four women, aged 46-61, after initial TVT operation were treated for persistent SUI. The severity of SUI was estimated by: physical examinations, cough tests, 24-h pad tests, and King's Health Questionnaire. The shortening procedure, based on excising the fragment of tape and suturing it back, was performed in all patients. Results All cases achieved a good result, which was defined as restoration of full continence. No complications occurred. The 12-month follow-up showed no side-effects. The postoperative control tests: the cough and 24-h pad tests were negative in all women. The general health perceptions increased after the shortening procedure by a mean value 44.25%. The incontinence impact decreased by a mean value 44.6%. In all patients, role and physical limitations significantly decreased (by 88.5% and 80.5%, respectively). The negative emotions connected with SUI significantly decreased after the second procedure. Conclusions The operative shortening of the implanted sling is a simple, cheap, and effective method of second-line treatment in cases of TVT failure and may be offered to the majority of patients with insufficient urethral support after the first procedure. PMID:24578885
Operator Certification Study Guide.
ERIC Educational Resources Information Center
American Water Works Association, Denver, CO.
This study guide contains typical questions and answers that all levels of water treatment plant operators might expect to find on a certification examination. The manual covers the basic sciences, treatment techniques, testing procedures, and federal legislation. (Author/SB)
NASA Technical Reports Server (NTRS)
Dietz, J. B.
1976-01-01
A flash evaporator heat rejection system representative of that proposed for the space shuttle orbiter underwent extensive system testing at the NASA Johnson Space Center (JSC) to determine its operational suitability and to establish system performance/operational characteristics for use in the shuttle system. During the tests the evaporator system demonstrated its suitability to meet the shuttle requirements by: (1) efficient operation with 90 to 95% water evaporation efficiency, (2) control of outlet temperature to 40 + or - 2 F for partial heat load operation, (3) stability of control system for rapid changes in Freon inlet temperature, and (4) repeated dormant-to-active device operation without any startup procedures.
DOT National Transportation Integrated Search
1996-04-01
THIS REPORT ALSO DESCRIBES THE PROCEDURES FOR DIRECT ESTIMATION OF INTERSECTION CAPACITY WITH SIMULATION, INCLUDING A SET OF RIGOROUS STATISTICAL TESTS FOR SIMULATION PARAMETER CALIBRATION FROM FIELD DATA.
Isaman, V; Thelin, R
1995-09-01
Standard Operating Procedures (SOPs) are required in order to comply with the Good Laboratory Practice Standards (GLPS) as promulgated in the Federal Insecticide, Fungicide and Rodenticide Act (FIFRA) 40 CFR Part 160. Paragraph 160.81 (a) states: "A testing facility shall have standard operating procedures in writing setting forth study methods that management is satisfied are adequate to insure the quality and integrity of the data generated in the course of a study." Types of SOPs include administrative and personnel, analyses, substances, quality assurance and records, test system, equipment, and field related. All SOPs must be adequate in scope to describe the function in sufficient detail such that the study data are reproducible. All SOPs must be approved by a management level as described in a corporate organization chart. Signatures for SOP responsibility, authorship, and Quality Assurance review adds strength and accountability to the SOP. In the event a procedure or method is performed differently from what is stated in the SOP, an SOP deviation is necessary. As methods and procedures are improved, SOP revisions are necessary to maintain SOP adequacy and applicability. The replaced SOP is put into a historical SOP file and all copies of the replaced SOPs are destroyed.
Conceptual Knowledge of Fraction Arithmetic
ERIC Educational Resources Information Center
Siegler, Robert S.; Lortie-Forgues, Hugues
2015-01-01
Understanding an arithmetic operation implies, at minimum, knowing the direction of effects that the operation produces. However, many children and adults, even those who execute arithmetic procedures correctly, may lack this knowledge on some operations and types of numbers. To test this hypothesis, we presented preservice teachers (Study 1),…
NASA Technical Reports Server (NTRS)
Edwards, B. B.; Coffey, E. W.
1974-01-01
The theory and operation of the scanner portion of the laser Doppler system for detecting and monitoring aircraft trailing vortices in an airport environment are discussed. Schematics, wiring diagrams, component values, and operation and checkout procedures are included.
Bird, Sheila M; Merrall, Elizabeth L C; Ward, Hester J T; Will, Robert G
2009-01-01
To assess the feasibility of post-mortem surveillance for subclinical variant Creutzfeldt-Jakob disease (vCJD) at least 5 years after neurosurgical procedures. Using Scottish record linkage, we estimated 5-year survival and re-operation rates after 4 neurosurgical procedures performed during 1993-2001 and identified as high or medium risk for transmitting vCJD: [B] drainage of extra- or subdural haematoma, [E] primary or revisional decompression operations and [H] creation of other ventricular shunts were classified as high risk; [C] operations on cerebral aneurysm (clipping) were classified as medium risk. Fatality rate at 1 year depended strongly on procedure, weakly or not at all on sex and era, and increased with age. Procedure rates differed by sex. The rate of subsequent neurosurgical operations was highest for procedure [H] (sole: 21%; multiple: 28%). Each year, the UK has a new cohort of some 5,000 5-year survivors after a high- or medium-risk neurosurgical procedure, whose subsequent annual mortality is at least 3%. Even if half the surviving 5-year survivors of neurosurgery since 1996 gave consent-in-life for vCJD-informative testing at post-mortem, there would be too few relevant post-mortems in 2008-2010 (around 1,600) for 'nil detections' to exclude a 1 in 1,000 subclinical vCJD rate. Autopsy surveillance beyond 2010, or among 5-year survivors of non-neurosurgical at-risk operations, would be needed. (c) 2009 S. Karger AG, Basel.
NASA Technical Reports Server (NTRS)
Tobin, R. D.
1974-01-01
Test hardware, facilities, and procedures are described along with results of electrically heated tube and channel tests conducted to determine adverse operating condition limits for convectively cooled chambers typical of Space Shuttle Orbit Manuevering Engine designs. Hot-start tests were conducted with corrosion resistant steel and nickel tubes with both monomethylhydrazine and 50-50 coolants. Helium ingestion, in both bubble and froth form, was studied in tubular test sections. Helium bubble ingestion and burn-out limits in rectangular channels were also investigated.
An Examination of Two Procedures for Identifying Consequential Item Parameter Drift
ERIC Educational Resources Information Center
Wells, Craig S.; Hambleton, Ronald K.; Kirkpatrick, Robert; Meng, Yu
2014-01-01
The purpose of the present study was to develop and evaluate two procedures flagging consequential item parameter drift (IPD) in an operational testing program. The first procedure was based on flagging items that exhibit a meaningful magnitude of IPD using a critical value that was defined to represent barely tolerable IPD. The second procedure…
Test Procedures for Semiconductor Random Access Memories
1979-11-01
of each cell exactly complement to each other, the read operations on the base cell in (g) of step 2 following operations ko S odd and in (p) of step...contents of Sko (these cells this address. Furthermore, when more than one contained I at test time and even if the con- cell is accessed then the output
DOT National Transportation Integrated Search
2009-06-01
To provide hardware, software, network, systems research, and testing for multi-million dollar traffic : operations, Intelligent Transportation Systems (ITS), and statewide communications investments, the : Traffic Engineering and Operations Office h...
DOT National Transportation Integrated Search
2009-06-01
To provide hardware, software, network, systems research, and testing for multi-million : dollar traffic operations, Intelligent Transportation Systems (ITS), and statewide : communications investments, the Traffic Engineering and Operations Office h...
ERIC Educational Resources Information Center
Metallinos, Nikos
This paper suggests specific experimental designs, criteria measures, and testing procedures for the empirical study of various field forces operative in the structure of the television picture. The purpose of the paper is twofold: first, to illustrate, through selected videotapes, the various field forces and, second, to provide specific…
Two diesel trucks equipped with a particulate filter (DPF) were tested at two ambient temperatures (70oF and 20oF), fuels (ultra low sulfur diesel (ULSD) and biodiesel (B20)) and operating loads (a heavy and light weight). The test procedure included three driving cycles, a cold ...
A Comparison of Domain Sampling Procedures for Test Construction
1992-10-01
B AEROSPACE GROUND EQUIPNENT GENERAL MECHANIC AFSC 454X1 306 KNOWLEDGE TEST AFPT 80-423-205 103 AEROSPACE GOUND EQUIPNENT SPECIALTY (AFS 454Xl) JOB... 454X1 ). The information collected will be used for research purposes only and will have no effect on your career. Test results will be available for...exercise proper towing and positioning procedures, operate two-way radios and clean vehicles. 127 AEROSPACE GROUND EQUIPMENT AFSC 454X1 SELF-RATING FORNS
2011-07-25
testing, the EFTR must be keyed with the same key used to encrypt the Enhanced Flight Termination Systems ( EFTS ) message. To ensure identical keys...required to verify the proper state. e. Procedure. (1) Pull up EFTS graphic user interface (GUI) (Figure 3). (2) Click “Receiver Power On...commanded mode steady state input currents will not exceed their specified values. TOP 05-2-543 25 July 2011 19 Figure 3. EFTS GUIa
Tuck, Melissa K; Chan, Daniel W; Chia, David; Godwin, Andrew K; Grizzle, William E; Krueger, Karl E; Rom, William; Sanda, Martin; Sorbara, Lynn; Stass, Sanford; Wang, Wendy; Brenner, Dean E
2009-01-01
Specimen collection is an integral component of clinical research. Specimens from subjects with various stages of cancers or other conditions, as well as those without disease, are critical tools in the hunt for biomarkers, predictors, or tests that will detect serious diseases earlier or more readily than currently possible. Analytic methodologies evolve quickly. Access to high-quality specimens, collected and handled in standardized ways that minimize potential bias or confounding factors, is key to the "bench to bedside" aim of translational research. It is essential that standard operating procedures, "the how" of creating the repositories, be defined prospectively when designing clinical trials. Small differences in the processing or handling of a specimen can have dramatic effects in analytical reliability and reproducibility, especially when multiplex methods are used. A representative working group, Standard Operating Procedures Internal Working Group (SOPIWG), comprised of members from across Early Detection Research Network (EDRN) was formed to develop standard operating procedures (SOPs) for various types of specimens collected and managed for our biomarker discovery and validation work. This report presents our consensus on SOPs for the collection, processing, handling, and storage of serum and plasma for biomarker discovery and validation.
NASA Technical Reports Server (NTRS)
Valdez, A.
1999-01-01
This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Electromagnetic Interference (EMI), Electromagnetic Susceptibility, and Electromagnetic Compatibility (EMC) qualification test for the Meteorological Satellite (METSAT) and the Meteorological Operation Platform (METOP) projects. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/5D. This document describes the EMI/EMC test performed by Aerojet and it is presented in the following manner: Section-1 contains introductory material and a brief summary of the test results. Section 2 contains more detailed descriptions of the test plan, test procedure, and test results for each type of EMI/EMC test conducted. Section 3 contains supplementary information that includes test data sheets, plots, and calculations collected during the qualification testing.
Ahmad, Arif; Carleton, Jared D; Ahmad, Zoha F; Agarwala, Ashish
2016-09-01
The purpose of this study was to compare the operative and early perioperative outcomes of laparoscopic versus robotic-assisted Roux-en-Y gastric bypass procedures performed in a community hospital setting. The study was a chart review and analysis of the early perioperative outcomes of a total of 345 Roux-en-Y gastric bypass procedures performed by a single surgeon in a community hospital setting from January 2011 to October 2014. Of these, 173 procedures were performed laparoscopically and 172 were performed with robotic assistance utilizing the daVinci(®) surgical platform. Factors such as baseline patient characteristics, operative time, estimated blood loss (EBL), conversions to open procedure, complication rates, adverse events, length of stay (LOS), and return to the operating room for the two groups were retrospectively analyzed from a prospectively maintained database. Student's t test with unequal variances was used for statistical analysis, and a p value <0.05 was used for significance. There were no statistically significant differences in complication rates, EBL, or LOS between the two groups. There was a significant difference between the total operative times (135.30 ± 37.60 min for the laparoscopic procedure versus 154.84 ± 38.44 min for the robotic procedure, p < 0.05). There were no adverse intraoperative events, conversions to open procedures, leaks, strictures, returns to the operating room within 30 days, or mortalities in either group. Our study, which is the first of its kind to analyze the operative and early perioperative outcomes between laparoscopic and robotic-assisted Roux-en-Y gastric bypass procedures in the US community hospital setting, indicates that both are comparable in terms of safety, efficacy, and operative and early perioperative outcomes.
ERIC Educational Resources Information Center
Samejima, Fumiko
The rationale behind the method of estimating the operating characteristics of discrete item responses when the test information of the Old Test is not constant was presented previously. In the present study, two subtests of the Old Test, i.e. Subtests 1, and 2, each of which has a different non-constant test information function, are used in…
Calfee, M. Worth; Tufts, Jenia; Meyer, Kathryn; McConkey, Katrina; Mickelsen, Leroy; Rose, Laura; Dowell, Chad; Delaney, Lisa; Weber, Angela; Morse, Stephen; Chaitram, Jasmine; Gray, Marshall
2016-01-01
Sample collection procedures and primary receptacle (sample container and bag) decontamination methods should prevent contaminant transfer between contaminated and non-contaminated surfaces and areas during bio-incident operations. Cross-contamination of personnel, equipment, or sample containers may result in the exfiltration of biological agent from the exclusion (hot) zone and have unintended negative consequences on response resources, activities and outcomes. The current study was designed to: (1) evaluate currently recommended sample collection and packaging procedures to identify procedural steps that may increase the likelihood of spore exfiltration or contaminant transfer; (2) evaluate the efficacy of currently recommended primary receptacle decontamination procedures; and (3) evaluate the efficacy of outer packaging decontamination methods. Wet- and dry-deposited fluorescent tracer powder was used in contaminant transfer tests to qualitatively evaluate the currently-recommended sample collection procedures. Bacillus atrophaeus spores, a surrogate for Bacillus anthracis, were used to evaluate the efficacy of spray- and wipe-based decontamination procedures. Both decontamination procedures were quantitatively evaluated on three types of sample packaging materials (corrugated fiberboard, polystyrene foam, and polyethylene plastic), and two contamination mechanisms (wet or dry inoculums). Contaminant transfer results suggested that size-appropriate gloves should be worn by personnel, templates should not be taped to or removed from surfaces, and primary receptacles should be selected carefully. The decontamination tests indicated that wipe-based decontamination procedures may be more effective than spray-based procedures; efficacy was not influenced by material type but was affected by the inoculation method. Incomplete surface decontamination was observed in all tests with dry inoculums. This study provides a foundation for optimizing current B. anthracis response procedures to minimize contaminant exfiltration. PMID:27362274
Calfee, M Worth; Tufts, Jenia; Meyer, Kathryn; McConkey, Katrina; Mickelsen, Leroy; Rose, Laura; Dowell, Chad; Delaney, Lisa; Weber, Angela; Morse, Stephen; Chaitram, Jasmine; Gray, Marshall
2016-12-01
Sample collection procedures and primary receptacle (sample container and bag) decontamination methods should prevent contaminant transfer between contaminated and non-contaminated surfaces and areas during bio-incident operations. Cross-contamination of personnel, equipment, or sample containers may result in the exfiltration of biological agent from the exclusion (hot) zone and have unintended negative consequences on response resources, activities and outcomes. The current study was designed to: (1) evaluate currently recommended sample collection and packaging procedures to identify procedural steps that may increase the likelihood of spore exfiltration or contaminant transfer; (2) evaluate the efficacy of currently recommended primary receptacle decontamination procedures; and (3) evaluate the efficacy of outer packaging decontamination methods. Wet- and dry-deposited fluorescent tracer powder was used in contaminant transfer tests to qualitatively evaluate the currently-recommended sample collection procedures. Bacillus atrophaeus spores, a surrogate for Bacillus anthracis, were used to evaluate the efficacy of spray- and wipe-based decontamination procedures. Both decontamination procedures were quantitatively evaluated on three types of sample packaging materials (corrugated fiberboard, polystyrene foam, and polyethylene plastic), and two contamination mechanisms (wet or dry inoculums). Contaminant transfer results suggested that size-appropriate gloves should be worn by personnel, templates should not be taped to or removed from surfaces, and primary receptacles should be selected carefully. The decontamination tests indicated that wipe-based decontamination procedures may be more effective than spray-based procedures; efficacy was not influenced by material type but was affected by the inoculation method. Incomplete surface decontamination was observed in all tests with dry inoculums. This study provides a foundation for optimizing current B. anthracis response procedures to minimize contaminant exfiltration.
Thermal performance evaluation of the infrared telescope dewar subsystem
NASA Technical Reports Server (NTRS)
Urban, E. W.
1986-01-01
Thermal performance evaluations (TPE) were conducted with the superfluid helium dewar of the Infrared Telescope (IRT) experiment from November 1981 to August 1982. Test included measuring key operating parameters, simulating operations with an attached instrument cryostat and validating servicing, operating and safety procedures. Test activities and results are summarized. All objectives are satisfied except for those involving transfer of low pressure liquid helium (LHe) from a supply dewar into the dewar subsystem.
Operations Nougat and Sun Beam. Organizational, operational, funding, and logistic summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-09-01
This report covers the organizational, operational, funding, and logistic portions of the DoD-DASA effort at the Nevada Test Site during Operations Nougat and Sun Beam. Operations included Shots Hard Hat, Marshmallow, Danny Boy, Johnie Boy, Small Boy, Little Feller I and II, and the Vela-Uniform Program. The field activities started in November 1961 and ended in September 1962. Appendixes A through G contain shot and meteorological data, copies of statements of authority and agreements, information on reporting procedures, and a list of all reports resulting from both the Nevada and Pacific test operations conducted during 1962. The reports on themore » Pacific tests are listed as a convenience to readers interested in related projects in Operation Dominic.« less
Lessons Learned in Science Operations for Planetary Surface Exploration
NASA Technical Reports Server (NTRS)
Young, K. E.; Graff, T. G.; Reagan, M.; Coan, D.; Evans, C. A.; Bleacher, J. E.; Glotch, T. D.
2017-01-01
The six Apollo lunar surface missions represent the only occasions where we have conducted scientific operations on another planetary surface. While these six missions were successful in bringing back valuable geologic samples, technology advances in the subsequent forty years have enabled much higher resolution scientific activity in situ. Regardless of where astronauts next visit (whether it be back to the Moon or to Mars or a Near Earth Object), the science operations procedures completed during this mission will need to be refined and updated to reflect these advances. We have undertaken a series of operational tests in relevant field environments to understand how best to develop the new generation of science operations procedures for planetary surface exploration.
US EPA BASE Study Standard Operating Procedure for Sampling of Particulates
The objective of the procedure described is to collect a sample of particles of respirable and inhalable size (approx. 0.1 to 10 microns in diameter) from indoor air and from the outdoor air supplied to the indoor space tested.
NASA Astrophysics Data System (ADS)
1984-09-01
This Test Operations Procedure (TOP) provides conventional test methods employing conventional test instrumentation for testing conventional radars. Single tests and subtests designed to test radar components, transmitters, receivers, antennas, etc., and system performance are conducted with single item instruments such as meters, generators, attenuators, counters, oscillators, plotters, etc., and with adequate land areas for conducting field tests.
XV-15 Tiltrotor Aircraft: 1997 Acoustic Testing
NASA Technical Reports Server (NTRS)
Edwards, Bryan D.; Conner, David A.
2003-01-01
XV-15 acoustic test is discussed, and measured results are presented. The test was conducted by NASA Langley and Bell Helicopter Textron, Inc., during June - July 1997, at the BHTI test site near Waxahachie, Texas. This was the second in a series of three XV-15 tests to document the acoustic signature of the XV-15 tiltrotor aircraft for a variety of flight conditions and minimize the noise signature during approach. Tradeoffs between flight procedures and the measured noise are presented to illustrate the noise abatement flight procedures. The test objectives were to: (1) support operation of future tiltrotors by further developing and demonstrating low-noise flight profiles, while maintaining acceptable handling and ride qualities, and (2) refine approach profiles, selected from previous (1995) tiltrotor testing, to incorporate Instrument Flight Rules (IFR), handling qualities constraints, operations and tradeoffs with sound. Primary emphasis was given to the approach flight conditions where blade-vortex interaction (BVI) noise dominates, because this condition influences community noise impact more than any other. An understanding of this part of the noise generating process could guide the development of low noise flight operations and increase the tiltrotor's acceptance in the community.
Testing coordinate measuring arms with a geometric feature-based gauge: in situ field trials
NASA Astrophysics Data System (ADS)
Cuesta, E.; Alvarez, B. J.; Patiño, H.; Telenti, A.; Barreiro, J.
2016-05-01
This work describes in detail the definition of a procedure for calibrating and evaluating coordinate measuring arms (AACMMs or CMAs). CMAs are portable coordinate measuring machines that have been widely accepted in industry despite their sensitivity to the skill and experience of the operator in charge of the inspection task. The procedure proposed here is based on the use of a dimensional gauge that incorporates multiple geometric features, specifically designed for evaluating the measuring technique when CMAs are used, at company facilities (workshops or laboratories) and by the usual operators who handle these devices in their daily work. After establishing the procedure and manufacturing the feature-based gauge, the research project was complemented with diverse in situ field tests performed with the collaboration of companies that use these devices in their inspection tasks. Some of the results are presented here, not only comparing different operators but also comparing different companies. The knowledge extracted from these experiments has allowed the procedure to be validated, the defects of the methodologies currently used for in situ inspections to be detected, and substantial improvements for increasing the reliability of these portable instruments to be proposed.
Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem
NASA Technical Reports Server (NTRS)
Kleiner, G. N.
1981-01-01
The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.
40 CFR 60.463 - Performance test and compliance provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operator shall use the following procedures for determining monthly volume-weighted average emissions of... Method 24 or an equivalent or alternative method. The owner or operator shall determine the volume of... facilities, the owner or operator shall estimate the volume of coating used at each affected facility by...
A Testlet Assembly Design for Adaptive Multistage Tests
ERIC Educational Resources Information Center
Luecht, Richard; Brumfield, Terry; Breithaupt, Krista
2006-01-01
This article describes multistage tests and some practical test development considerations related to the design and implementation of a multistage test, using the Uniform CPA (certified public accountant) Examination as a case study. The article further discusses the use of automated test assembly procedures in an operational context to produce…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ward, T.E.; Hartman, M.W.; Olin, R.C.
1989-06-01
Quality-assurance procedures are contained in this comprehensive document intended to be used as an aid for wood-heater manufacturers and testing laboratories in performing particulate matter sampling of wood heaters according to EPA protocol, Method 5G. These procedures may be used in research and development, and as an aid in auditing and certification testing. A detailed, step-by-step quality assurance guide is provided to aid in the procurement and assembly of testing apparatus, to clearly describe the procedures, and to facilitate data collection and reporting. Suggested data sheets are supplied that can be used as an aid for both recordkeeping and certificationmore » applications. Throughout the document, activity matrices are provided to serve as a summary reference. Checklists are also supplied that can be used by testing personnel. Finally, for the purposes of ensuring data quality, procedures are outlined for apparatus operation, maintenance, and traceability. These procedures combined with the detailed description of the sampling and analysis protocol will help ensure the accuracy and reliability of Method 5G emission-testing results.« less
Improved Use of Satellite Imagery to Forecast Hurricanes
NASA Technical Reports Server (NTRS)
Louis, Jean-Francois
2001-01-01
This project tested a novel method that uses satellite imagery to correct phase errors in the initial state for numerical weather prediction, applied to hurricane forecasts. The system was tested on hurricanes Guillermo (1997), Felicia (1997) and Iniki (1992). We compared the performance of the system with and without phase correction to a procedure that uses bogus data in the initial state, similar to current operational procedures. The phase correction keeps the hurricane on track in the analysis and is far superior to a system without phase correction. Compared to operational procedure, phase correction generates somewhat worse 3-day forecast of the hurricane track, but better forecast of intensity. It is believed that the phase correction module would work best in the context of 4-dimensional variational data assimilation. Very little modification to 4DVar would be required.
NASA Technical Reports Server (NTRS)
1972-01-01
Prior to beginning a 90-day test of a regenerative life support system, a need was identified for a training and certification program to qualify an operating staff for conducting the test. The staff was responsible for operating and maintaining the test facility, monitoring and ensuring crew safety, and implementing procedures to ensure effective mission performance with good data collection and analysis. The training program was designed to ensure that each operating staff member was capable of performing his assigned function and was sufficiently cross-trained to serve at certain other positions on a contingency basis. Complicating the training program were budget and schedule limitations, and the high level of sophistication of test systems.
49 CFR 383.71 - Driver application procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... skills test is representative of the type of motor vehicle that person operates or expects to operate; (5....71 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS COMMERCIAL...
Objective assessment of operator performance during ultrasound-guided procedures.
Tabriz, David M; Street, Mandie; Pilgram, Thomas K; Duncan, James R
2011-09-01
Simulation permits objective assessment of operator performance in a controlled and safe environment. Image-guided procedures often require accurate needle placement, and we designed a system to monitor how ultrasound guidance is used to monitor needle advancement toward a target. The results were correlated with other estimates of operator skill. The simulator consisted of a tissue phantom, ultrasound unit, and electromagnetic tracking system. Operators were asked to guide a needle toward a visible point target. Performance was video-recorded and synchronized with the electromagnetic tracking data. A series of algorithms based on motor control theory and human information processing were used to convert raw tracking data into different performance indices. Scoring algorithms converted the tracking data into efficiency, quality, task difficulty, and targeting scores that were aggregated to create performance indices. After initial feasibility testing, a standardized assessment was developed. Operators (N = 12) with a broad spectrum of skill and experience were enrolled and tested. Overall scores were based on performance during ten simulated procedures. Prior clinical experience was used to independently estimate operator skill. When summed, the performance indices correlated well with estimated skill. Operators with minimal or no prior experience scored markedly lower than experienced operators. The overall score tended to increase according to operator's clinical experience. Operator experience was linked to decreased variation in multiple aspects of performance. The aggregated results of multiple trials provided the best correlation between estimated skill and performance. A metric for the operator's ability to maintain the needle aimed at the target discriminated between operators with different levels of experience. This study used a highly focused task model, standardized assessment, and objective data analysis to assess performance during simulated ultrasound-guided needle placement. The performance indices were closely related to operator experience.
Convert Ten Foot Environmental Test Chamber into an Ion Engine Test Chamber
NASA Technical Reports Server (NTRS)
VanVelzer, Paul
2006-01-01
The 10 Foot Space Simulator at the Jet Propulsion Laboratory has been used for the last 40 years to test numerous spacecraft, including the Ranger series, several Mariner class, among many others and finally, the Spirit and Opportunity Mars Rovers. The request was made to convert this facility to an Ion Engine test facility, with a possible long term life test. The Ion engine was to propel the Prometheus spacecraft to Jupiter's moons. This paper discusses the challenges that were met, both from a procedural and physical standpoint. The converted facility must operate unattended, support a 30 Kw Ion Engine, operate economically, and be easily converted back to former operation as a spacecraft test facility.
Rocket Propulsion 21 Steering Committee Meeting (RP21) NASA In-Space Propulsion Update
NASA Technical Reports Server (NTRS)
Klem, Mark
2015-01-01
In-house Support of NEXT-C Contract Status Thruster NEXT Long Duration Test post-test destructive evaluation in progress Findings will be used to verify service life models identify potential design improvements Cathode heater fabrication initiated for cyclic life testing Thruster operating algorithm definition verification initiated to provide operating procedures for mission users High voltage propellant isolator life test voluntarily terminated after successfully operating 51,200 h Power processor unit (PPU) Replaced all problematic stacked multilayer ceramic dual inline pin capacitors within PPU Test bed Rebuilt installed discharge power supply primary power board Completed full functional performance characterization Final test report in progress Transferred PPU Testbed to contractor to support prototype design effort.
Test Operations Procedure (TOP) 1-1-062 Environmental Effects Data Collection
2008-09-12
this procedure. 11. ESTIMATION DESCRIPTION The prime example of an empirically based model is the Universal Soil Loss Equation ( USLE ) developed...impacts to human health and welfare and to the natural environment. The type of data collected might include noise levels, soil erosion, and...uptake relevant to flora/fauna and the soil erosion effects of proposed testing. c. Plan to identify any modifications/alternatives implemented
Suggested Operating Procedures for Aquifer Pumping Tests
This document is intended as a primer, describing the process for the design and performance of an “aquifer test” (how to obtain reliable data from a pumping test) to obtain accurate estimates of aquifer parameters.
Ultrasensitive surveillance of sensors and processes
Wegerich, Stephan W.; Jarman, Kristin K.; Gross, Kenneth C.
2001-01-01
A method and apparatus for monitoring a source of data for determining an operating state of a working system. The method includes determining a sensor (or source of data) arrangement associated with monitoring the source of data for a system, activating a method for performing a sequential probability ratio test if the data source includes a single data (sensor) source, activating a second method for performing a regression sequential possibility ratio testing procedure if the arrangement includes a pair of sensors (data sources) with signals which are linearly or non-linearly related; activating a third method for performing a bounded angle ratio test procedure if the sensor arrangement includes multiple sensors and utilizing at least one of the first, second and third methods to accumulate sensor signals and determining the operating state of the system.
Ultrasensitive surveillance of sensors and processes
Wegerich, Stephan W.; Jarman, Kristin K.; Gross, Kenneth C.
1999-01-01
A method and apparatus for monitoring a source of data for determining an operating state of a working system. The method includes determining a sensor (or source of data) arrangement associated with monitoring the source of data for a system, activating a method for performing a sequential probability ratio test if the data source includes a single data (sensor) source, activating a second method for performing a regression sequential possibility ratio testing procedure if the arrangement includes a pair of sensors (data sources) with signals which are linearly or non-linearly related; activating a third method for performing a bounded angle ratio test procedure if the sensor arrangement includes multiple sensors and utilizing at least one of the first, second and third methods to accumulate sensor signals and determining the operating state of the system.
Ground operation of robotics on Space Station Freedom
NASA Technical Reports Server (NTRS)
Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.
1993-01-01
This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.
Ground operation of robotics on Space Station Freedom
NASA Astrophysics Data System (ADS)
Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.
1993-03-01
This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.
Incorporating Comorbidity Within Risk Adjustment for UK Pediatric Cardiac Surgery.
Brown, Katherine L; Rogers, Libby; Barron, David J; Tsang, Victor; Anderson, David; Tibby, Shane; Witter, Thomas; Stickley, John; Crowe, Sonya; English, Kate; Franklin, Rodney C; Pagel, Christina
2017-07-01
When considering early survival rates after pediatric cardiac surgery it is essential to adjust for risk linked to case complexity. An important but previously less well understood component of case mix complexity is comorbidity. The National Congenital Heart Disease Audit data representing all pediatric cardiac surgery procedures undertaken in the United Kingdom and Ireland between 2009 and 2014 was used to develop and test groupings for comorbidity and additional non-procedure-based risk factors within a risk adjustment model for 30-day mortality. A mixture of expert consensus based opinion and empiric statistical analyses were used to define and test the new comorbidity groups. The study dataset consisted of 21,838 pediatric cardiac surgical procedure episodes in 18,834 patients with 539 deaths (raw 30-day mortality rate, 2.5%). In addition to surgical procedure type, primary cardiac diagnosis, univentricular status, age, weight, procedure type (bypass, nonbypass, or hybrid), and era, the new risk factor groups of non-Down congenital anomalies, acquired comorbidities, increased severity of illness indicators (eg, preoperative mechanical ventilation or circulatory support) and additional cardiac risk factors (eg, heart muscle conditions and raised pulmonary arterial pressure) all independently increased the risk of operative mortality. In an era of low mortality rates across a wide range of operations, non-procedure-based risk factors form a vital element of risk adjustment and their presence leads to wide variations in the predicted risk of a given operation. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.
7 CFR 58.928 - Quality control tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 3 2011-01-01 2011-01-01 false Quality control tests. 58.928 Section 58.928... Procedures § 58.928 Quality control tests. All dairy products and other ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be...
7 CFR 58.335 - Quality control tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 3 2011-01-01 2011-01-01 false Quality control tests. 58.335 Section 58.335... Procedures § 58.335 Quality control tests. All milk, cream and related products are subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on flow...
47 CFR 80.101 - Radiotelephone testing procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... five minutes. (b) Testing of transmitters must be confined to single frequency channels on working... operator must not interfere with transmissions in progress. (2) The testing station's call sign, followed by the word “test”, must be announced on the radio-channel being used for the test. (3) If any...
47 CFR 80.101 - Radiotelephone testing procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... five minutes. (b) Testing of transmitters must be confined to single frequency channels on working... operator must not interfere with transmissions in progress. (2) The testing station's call sign, followed by the word “test”, must be announced on the radio-channel being used for the test. (3) If any...
40 CFR 91.410 - Engine test cycle.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Engine test cycle. 91.410 Section 91...) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.410 Engine... in dynamometer operation tests of marine engines. (b) During each non-idle mode the specified speed...
Vivod, Gregor; Verdonk, Peter; Drobnič, Matej
2014-11-01
A retrospective single-centre study was focused on the long-term outcome after different patello-femoral (PF) realignment procedures. Thirty-nine patients treated for recurrent PF instability were examined after a mean post-operative time of 22.5 years. Their 78 knees were divided into: non-operated knees (NON-OPERATED)-N = 24, isolated proximal procedures (PROXIMAL)-N = 22, isolated distal procedures (DISTAL)-N = 10, and combined procedures (COMBINED)-N = 22. PF-related medical history together with clinical, subjective (KOOS and Kujala scores), and radiographic (Caton-Deschamps PF height index, Kellgren-Lawrence scale for tibio-femoral OA, and Iwano classification for PF OA) evaluation was conducted. PF re-dislocation rate was comparable between PROXIMAL (36%), DISTAL (20%), and COMBINED (32%). Isolated proximal procedures revealed less central patella positions (PROXIMAL 64%; DISTAL 90%; COMBINED 95%) and more frequent PF apprehension test (PROXIMAL 82%; DISTAL 40%, COMBINED 50%). KOOS and Kujala scores were similar in all three surgical subgroups, but significantly lower than in NON-OPERATED. Patellas were positioned lower after DISTAL, 0.8 (0.5-1.0) or COMBINED, 0.9 (0.4-1.3). Kellgren-Lawrence scores ≥2 were found in 42% NON-OPERATED, 37% PROXIMAL, 70% DISTAL, and 59% COMBINED, whereas Iwano classification ≥2 was confirmed in 46% NON-OPERATED, 64% PROXIMAL, 80% DISTAL, and 86% COMBINED. High PF re-dislocation rates together with a very high incidence of PF OA indicate that PF realignment strategies used traditionally had failed to reach their long-term expectations. The transfer of tibial tuberosity resulted in more constrained PF joints than isolated proximal procedures which allowed for more residual PF instability. Distal procedures additionally increased the likelihood for tibio-femoral OA. III.
CTEPP STANDARD OPERATING PROCEDURE FOR TRANSLATING VIDEOTAPES OF CHILD ACTIVITIES (SOP-4.13)
The EPA will conduct a two-day video translation workshop to demonstrate to coders the procedures for translating the activity patterns of preschool children on videotape. The coders will be required to pass reliability tests to successfully complete the training requirements of ...
40 CFR 1037.550 - Special procedures for testing hybrid systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... simulating a chassis test with a pre-transmission or post-transmission hybrid system for A to B testing...) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW HEAVY-DUTY MOTOR VEHICLES Test and Modeling...) Collect CO2 emissions while operating the system over the test cycles specified in § 1037.510. (c) Collect...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
40 CFR 63.848 - Emission monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and POM emissions from anode bake furnaces. Using the procedures in § 63.847 and in the approved test plan, the owner or operator shall monitor TF and POM emissions from each anode bake furnace on an... owner or operator of a new or existing potline or anode bake furnace shall install, operate, and...
7 CFR 205.504 - Evidence of expertise and ability.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operations it has certified, including for each the name of the operation, type(s) of operation, products... and residue testing pursuant to § 205.670. (c) Conflicts of interest. (1) A copy of procedures intended to be implemented to prevent the occurrence of conflicts of interest, as described in § 205.501(a...
NASA Technical Reports Server (NTRS)
1971-01-01
Spacecraft development, mission design planning, flight crew operations, and flight operations are considered. Spacecraft design principles and test activities are described. Determination of the best series of flights leading to a lunar landing at the earliest possible time, flight planning, techniques for establishing flight procedures and carrying out flight operations, and crew training and simulation activities are discussed.
Performance testing accountability measurements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oldham, R.D.; Mitchell, W.G.; Spaletto, M.I.
The New Brunswick Laboratory (NBL) provides assessment support to the DOE Operations Offices in the area of Material Control and Accountability (MC and A). During surveys of facilities, the Operations Offices have begun to request from NBL either assistance in providing materials for performance testing of accountability measurements or both materials and personnel to do performance testing. To meet these needs, NBL has developed measurement and measurement control performance test procedures and materials. The present NBL repertoire of performance tests include the following: (1) mass measurement performance testing procedures using calibrated and traceable test weights, (2) uranium elemental concentration (assay)more » measurement performance tests which use ampulated solutions of normal uranyl nitrate containing approximately 7 milligrams of uranium per gram of solution, and (3) uranium isotopic measurement performance tests which use ampulated uranyl nitrate solutions with enrichments ranging from 4% to 90% U-235. The preparation, characterization, and packaging of the uranium isotopic and assay performance test materials were done in cooperation with the NBL Safeguards Measurements Evaluation Program since these materials can be used for both purposes.« less
Life and Reliability Characteristics of TurboBrayton Coolers
NASA Technical Reports Server (NTRS)
Breedlove, Jeff J.; Zagarola, Mark; Nellis, Greg; Dolan, Frank; Swift, Walt; Gibbon, Judith; Obenschain, Arthur F. (Technical Monitor)
2000-01-01
Wear and internal contaminants are two of the primary factors that influence reliable, long-life operation of turbo-Brayton cryocoolers. This paper describes tests that have been conducted and methods that have been developed for turbo-Brayton components and systems to assure reliable operation. The turbomachines used in these coolers employ self-acting gas bearings to support the miniature high-speed shafts, thus providing vibration-free operation. Because the bearings are self-acting, rubbing contact occurs during initial start-up and shutdown of the machines. Bearings and shafts are designed to endure multiple stop/start cycles without producing particles or surface features that would impair the proper operation of the machines. Test results are presented for a variety of turbomachines used in these systems. The tests document extended operating life and start/stop cycling behavior for machines over a range of time and temperature scales. Contaminants such as moisture and other residual gas impurities can be a source of degraded operation if they freeze out in sufficient quantities to block flow passages or if they mechanically affect the operation of the machines. A post-fabrication bakeout procedure has been successfully used to reduce residual internal contamination to acceptable levels in a closed cycle system. The process was developed during space qualification tests on the NICMOS cryocooler. Moisture levels were sampled over a six-month time interval confirming the effectiveness of the technique. A description of the bakeout procedure is presented.
XV-15 Tiltrotor Aircraft: 1999 Acoustic Testing - Test Report
NASA Technical Reports Server (NTRS)
Edwards, Bryan D.; Conner, David A.
2003-01-01
An XV-15 acoustic test is discussed, and measured results are presented. The test was conducted by NASA Langley and Bell Helicopter Textron, Inc., during October 1999, at the BHTI test site near Waxahachie, Texas. As part of the NASA-sponsored Short Haul Civil Tiltrotor noise reduction initiative, this was the third in a series of three major XV-15 acoustic tests. Their purpose was to document the acoustic signature of the XV-15 tiltrotor aircraft for a variety of flight conditions and to minimize the noise signature during approach. Tradeoffs between flight procedures and the measured noise are presented to illustrate the noise abatement flight procedures. The test objectives were to support operation of future tiltrotors by further developing and demonstrating low-noise flight profiles, while maintaining acceptable handling and ride qualities, and refine approach profiles, selected from previous (1995 & 1997) tiltrotor testing, to incorporate Instrument Flight Rules (IFR), handling qualities constraints, operations and tradeoffs with sound. Primary emphasis was given to the approach flight conditions where blade-vortex interaction (BVI) noise dominates, because this condition influences community noise impact more than any other. An understanding of this part of the noise generating process could guide the development of low noise flight operations and increase the tiltrotor's acceptance in the community.
XV-15 Tiltrotor Low Noise Terminal Area Operations
NASA Technical Reports Server (NTRS)
Conner, David A.; Marcolini, Michael A.; Edwards, Bryan D.; Brieger, John T.
1998-01-01
Acoustic data have been acquired for the XV-15 tiltrotor aircraft performing a variety of terminal area operating procedures. This joint NASA/Bell/Army test program was conducted in two phases. During Phase 1 the XV-15 was flown over a linear array of microphones, deployed perpendicular to the flight path, at a number of fixed operating conditions. This documented the relative noise differences between the various conditions. During Phase 2 the microphone array was deployed over a large area to directly measure the noise footprint produced during realistic approach and departure procedures. The XV-15 flew approach profiles that culminated in IGE hover over a landing pad, then takeoffs from the hover condition back out over the microphone array. Results from Phase 1 identify noise differences between selected operating conditions, while those from Phase 2 identify differences in noise footprints between takeoff and approach conditions and changes in noise footprint due to variation in approach procedures.
40 CFR 60.285a - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... performance test. (b) The owner or operator must determine compliance with the filterable particulate matter... used to determine the filterable particulate matter concentration. The sampling time and sample volume... repeat performance tests for filterable particulate matter at intervals no longer than 5 years following...
40 CFR 1065.920 - PEMS Calibrations and verifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... verification. The verification consists of operating an engine over a duty cycle in the laboratory and... by laboratory equipment as follows: (1) Mount an engine on a dynamometer for laboratory testing...
Test Operations Procedure (TOP) 01-2-624 High Power Microwave (HPM) Testing
2015-07-06
Requests _____ The proposed frequency list for the HPM facility is listed below. Source Primary Frequencies (MHz) Alternate Frequencies (MHz) NBTS...during testing. The proposed frequency list for the HPM facility is listed below. Source Primary Frequencies (MHz) Alternate Frequencies (MHz
40 CFR 53.58 - Operational field precision and blank test.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent... samplers are also subject to a test for possible deposition of particulate matter on inactive filters...
40 CFR 53.58 - Operational field precision and blank test.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent... samplers are also subject to a test for possible deposition of particulate matter on inactive filters...
40 CFR 53.58 - Operational field precision and blank test.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS (CONTINUED) AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent... samplers are also subject to a test for possible deposition of particulate matter on inactive filters...
40 CFR 53.58 - Operational field precision and blank test.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Physical (Design) and Performance Characteristics of Reference Methods and Class I and Class II Equivalent... samplers are also subject to a test for possible deposition of particulate matter on inactive filters...
40 CFR 90.404 - Test procedure overview.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) CONTROL OF EMISSIONS FROM NONROAD SPARK-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Gaseous Exhaust Test... operating conditions to be conducted on an engine dynamometer or equivalent load and speed measurement... to determine the brake-specific emissions of non-methane hydrocarbons. The test consists of three...
Test Operations Procedure (TOP) 01-1-025 Camouflage Performance Testing Using Observers
2016-05-05
15. SUBJECT TERMS camouflage, detection, blending , signatures 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT SAR 18...21 6.2 Blending Data... learning effect on observers. If military personnel are required for testing, determine if Military Occupational Specialty (MOS) qualified Soldier
NASA Technical Reports Server (NTRS)
Mitchell, T. R.
1974-01-01
The development of a test engineer oriented language has been under way at the Kennedy Space Center for several years. The result of this effort is the Ground Operations Aerospace Language, GOAL, a self-documenting, high-order language suitable for coding automatic test, checkout and launch procedures. GOAL is a highly readable, writable, retainable language that is easily learned by nonprogramming oriented engineers. It is sufficiently powerful for use at all levels of Space Shuttle ground processing, from line replaceable unit checkout to integrated launch day operations. This paper will relate the language development, and describe GOAL and its applications.
Recent Achievements of the Collaboratory for the Study of Earthquake Predictability
NASA Astrophysics Data System (ADS)
Jackson, D. D.; Liukis, M.; Werner, M. J.; Schorlemmer, D.; Yu, J.; Maechling, P. J.; Zechar, J. D.; Jordan, T. H.
2015-12-01
Maria Liukis, SCEC, USC; Maximilian Werner, University of Bristol; Danijel Schorlemmer, GFZ Potsdam; John Yu, SCEC, USC; Philip Maechling, SCEC, USC; Jeremy Zechar, Swiss Seismological Service, ETH; Thomas H. Jordan, SCEC, USC, and the CSEP Working Group The Collaboratory for the Study of Earthquake Predictability (CSEP) supports a global program to conduct prospective earthquake forecasting experiments. CSEP testing centers are now operational in California, New Zealand, Japan, China, and Europe with 435 models under evaluation. The California testing center, operated by SCEC, has been operational since Sept 1, 2007, and currently hosts 30-minute, 1-day, 3-month, 1-year and 5-year forecasts, both alarm-based and probabilistic, for California, the Western Pacific, and worldwide. We have reduced testing latency, implemented prototype evaluation of M8 forecasts, and are currently developing formats and procedures to evaluate externally-hosted forecasts and predictions. These efforts are related to CSEP support of the USGS program in operational earthquake forecasting and a DHS project to register and test external forecast procedures from experts outside seismology. A retrospective experiment for the 2010-2012 Canterbury earthquake sequence has been completed, and the results indicate that some physics-based and hybrid models outperform purely statistical (e.g., ETAS) models. The experiment also demonstrates the power of the CSEP cyberinfrastructure for retrospective testing. Our current development includes evaluation strategies that increase computational efficiency for high-resolution global experiments, such as the evaluation of the Global Earthquake Activity Rate (GEAR) model. We describe the open-source CSEP software that is available to researchers as they develop their forecast models (http://northridge.usc.edu/trac/csep/wiki/MiniCSEP). We also discuss applications of CSEP infrastructure to geodetic transient detection and how CSEP procedures are being adapted to ground motion prediction experiments.
2013-12-16
p. Pretest and posttest physiological data on the TPs. q. Logbooks from test chamber and laboratory operators and laboratory QA chemist. TOP...shown on the videotape of the actual exercises performed. TPs will be identified by the TIIN of the suit worn. g. Pretest and posttest ...information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on
A new veno-venous bypass type for ex-vivo liver resection in dogs.
Lei, Peng; Liu, Shi-Qi; Cui, Xiao-Hai; Lv, Yi; Zhao, Ge; Li, Jian-Hui
2013-08-01
Ex-vivo liver resection is a procedure in which the liver is completely removed, perfused and after bench surgery, the liver is autotransplanted to the original site. Ex-vivo liver resection is an important treatment for unresectable liver tumors. This surgical procedure requires long operation time, during which blood flow must be carefully maintained to avoid venous congestion. An effective veno-venous bypass (VVB) may meet this requirement. The present study was to test our new designed VVB device which comprised one heparinized polyvinylchloride tube and three magnetic rings. The efficacy of this device was tested in five dogs. A VVB was established in 6-10 minutes. There was no leakage during the procedure. Hemodynamics was stable at anhepatic phase, which indicated that the bypass was successful. This newly-developed VVB device maintained circulation stability during ex-vivo liver resection in our dog model and thus, this VVB device significantly shortened the operation time.
NASA Technical Reports Server (NTRS)
Hypes, W. D.; Ohlhorst, C. W.
1977-01-01
Two remote sensor evaluation experiments are discussed. One experiment was conducted at the DuPont acid-dump site off the Delaware coast. The second was conducted at an organic waste outfall in the Delaware River. The operational objective of obtaining simultaneous sea truth sampling with remote sensors overpasses was met. Descriptions of the test sites, sensors, sensor platforms, flight lines, sea truth data collected, and operational chronology are presented.
Queueing Network Models for Parallel Processing of Task Systems: an Operational Approach
NASA Technical Reports Server (NTRS)
Mak, Victor W. K.
1986-01-01
Computer performance modeling of possibly complex computations running on highly concurrent systems is considered. Earlier works in this area either dealt with a very simple program structure or resulted in methods with exponential complexity. An efficient procedure is developed to compute the performance measures for series-parallel-reducible task systems using queueing network models. The procedure is based on the concept of hierarchical decomposition and a new operational approach. Numerical results for three test cases are presented and compared to those of simulations.
Effluent Monitoring Procedures: Nutrients. Student Reference Manual.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. The Student Reference Manual provides step-by-step procedures for laboratory application of equipment operating…
40 CFR 61.203 - Radon monitoring and compliance procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Radon monitoring and compliance... for Radon Emissions From Phosphogypsum Stacks § 61.203 Radon monitoring and compliance procedures. (a..., each owner or operator of an inactive phosphogypsum stack shall test the stack for radon-222 flux in...
40 CFR 86.1332-90 - Engine mapping procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations for New Otto-Cycle and Diesel Heavy-Duty Engines; Gaseous and Particulate Exhaust Test Procedures... maximum mapping speed per the following methodologies. (Note paragraph (d)(1) below.) (1) Otto-cycle engines. (i) For ungoverned engines using the transient operating cycle set forth in paragraph (f)(1) of...
40 CFR 1065.362 - Non-stoichiometric raw exhaust FID O2 interference verification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calibrations and Verifications Hydrocarbon... frequency. If you use FID analyzers for raw exhaust measurements from engines that operate in a non...; otherwise restart the procedure at paragraph (d)(4) of this section. (13) Calculate the percent difference...
40 CFR 1065.362 - Non-stoichiometric raw exhaust FID O2 interference verification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calibrations and Verifications Hydrocarbon... frequency. If you use FID analyzers for raw exhaust measurements from engines that operate in a non...; otherwise restart the procedure at paragraph (d)(4) of this section. (13) Calculate the percent difference...
Effluent Monitoring Procedures: Metals Analyses. Student Reference Manual.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. The Student Reference Manual provides step-by-step procedures for laboratory application of equipment operating…
40 CFR 61.203 - Radon monitoring and compliance procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Radon monitoring and compliance... for Radon Emissions From Phosphogypsum Stacks § 61.203 Radon monitoring and compliance procedures. (a..., each owner or operator of an inactive phosphogypsum stack shall test the stack for radon-222 flux in...
The objective of the procedure is to collect a representative sample concentration of total airborne fungal spores (viable and non-viable) that may be present in indoor air and in the outdoor air supplied to the space tested.
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... methods that management is satisfied are adequate to insure the quality and integrity of the data... authorized by the study director and shall be documented in the raw data. Significant changes in established... procedures shall be established for, but not limited to, the following: (1) Test system area preparation. (2...
40 CFR 160.81 - Standard operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... methods that management is satisfied are adequate to insure the quality and integrity of the data... authorized by the study director and shall be documented in the raw data. Significant changes in established... procedures shall be established for, but not limited to, the following: (1) Test system area preparation. (2...
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Operator interaction effects. 610.23 Section 610.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Evaluation Criteria for the Preliminary...
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Operator interaction effects. 610.23 Section 610.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Evaluation Criteria for the Preliminary...
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Operator interaction effects. 610.23 Section 610.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Evaluation Criteria for the Preliminary...
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Operator interaction effects. 610.23 Section 610.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Evaluation Criteria for the Preliminary...
40 CFR 160.35 - Quality assurance unit.
Code of Federal Regulations, 2012 CFR
2012-07-01
... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...
40 CFR 160.35 - Quality assurance unit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...
40 CFR 160.35 - Quality assurance unit.
Code of Federal Regulations, 2014 CFR
2014-07-01
... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...
40 CFR 160.35 - Quality assurance unit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...
40 CFR 160.35 - Quality assurance unit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...
40 CFR 63.8445 - How do I conduct performance tests and establish operating limits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... startup, shutdown, or malfunction, as specified in § 63.7(e)(1). (f) You must conduct at least three... changes. (ii) The type of monitoring device or procedure that will be used. (iii) The operating parameters...
Single-Port Surgery: Laboratory Experience with the daVinci Single-Site Platform
Haber, Georges-Pascal; Kaouk, Jihad; Kroh, Matthew; Chalikonda, Sricharan; Falcone, Tommaso
2011-01-01
Background and Objectives: The purpose of this study was to evaluate the feasibility and validity of a dedicated da Vinci single-port platform in the porcine model in the performance of gynecologic surgery. Methods: This pilot study was conducted in 4 female pigs. All pigs had a general anesthetic and were placed in the supine and flank position. A 2-cm umbilical incision was made, through which a robotic single-port device was placed and pneumoperitoneum obtained. A data set was collected for each procedure and included port placement time, docking time, operative time, blood loss, and complications. Operative times were compared between cases and procedures by use of the Student t test. Results: A total of 28 surgical procedures (8 oophorectomies, 4 hysterectomies, 8 pelvic lymph node dissections, 4 aorto-caval nodal dissections, 2 bladder repairs, 1 uterine horn anastomosis, and 1 radical cystectomy) were performed. There was no statistically significant difference in operating times for symmetrical procedures among animals (P=0.3215). Conclusions: This animal study demonstrates that single-port robotic surgery using a dedicated single-site platform allows performing technically challenging procedures within acceptable operative times and without complications or insertion of additional trocars. PMID:21902962
Electromagnetic propulsion test facility
NASA Technical Reports Server (NTRS)
Gooder, S. T.
1984-01-01
A test facility for the exploration of electromagnetic propulsion concept is described. The facility is designed to accommodate electromagnetic rail accelerators of various lengths (1 to 10 meters) and to provide accelerating energies of up to 240 kiloJoules. This accelerating energy is supplied as a current pulse of hundreds of kiloAmps lasting as long as 1 millisecond. The design, installation, and operating characteristics of the pulsed energy system are discussed. The test chamber and its operation at pressures down to 1300 Pascals (10 mm of mercury) are described. Some aspects of safety (interlocking, personnel protection, and operating procedures) are included.
Development of flying qualities criteria for single pilot instrument flight operations
NASA Technical Reports Server (NTRS)
Bar-Gill, A.; Nixon, W. B.; Miller, G. E.
1982-01-01
Flying qualities criteria for Single Pilot Instrument Flight Rule (SPIFR) operations were investigated. The ARA aircraft was modified and adapted for SPIFR operations. Aircraft configurations to be flight-tested were chosen and matched on the ARA in-flight simulator, implementing modern control theory algorithms. Mission planning and experimental matrix design were completed. Microprocessor software for the onboard data acquisition system was debugged and flight-tested. Flight-path reconstruction procedure and the associated FORTRAN program were developed. Algorithms associated with the statistical analysis of flight test results and the SPIFR flying qualities criteria deduction are discussed.
Spacelab mission development tests
NASA Technical Reports Server (NTRS)
Dalton, B. P.
1978-01-01
The paper describes Spacelab Mission Development Test III (SMD III) whose principal scientific objective was to demonstrate the feasibility of conducting biological research in the Life Sciences Spacelab. The test also provided an opportunity to try out several items of Common Operational Research Equipment (CORE) hardware being developed for operational use in Shuttle/Spacelab, such as rodent and primate handling, transportation units, and a 'zero-g' surgical bench. Operational concepts planned for Spacelab were subjected to evaluation, including animal handling procedures, animal logistics, crew selection and training, and a 'remote' ground station concept. It is noted that all the objectives originally proposed for SMD III were accomplished
Homogeneity tests of clustered diagnostic markers with applications to the BioCycle Study
Tang, Liansheng Larry; Liu, Aiyi; Schisterman, Enrique F.; Zhou, Xiao-Hua; Liu, Catherine Chun-ling
2014-01-01
Diagnostic trials often require the use of a homogeneity test among several markers. Such a test may be necessary to determine the power both during the design phase and in the initial analysis stage. However, no formal method is available for the power and sample size calculation when the number of markers is greater than two and marker measurements are clustered in subjects. This article presents two procedures for testing the accuracy among clustered diagnostic markers. The first procedure is a test of homogeneity among continuous markers based on a global null hypothesis of the same accuracy. The result under the alternative provides the explicit distribution for the power and sample size calculation. The second procedure is a simultaneous pairwise comparison test based on weighted areas under the receiver operating characteristic curves. This test is particularly useful if a global difference among markers is found by the homogeneity test. We apply our procedures to the BioCycle Study designed to assess and compare the accuracy of hormone and oxidative stress markers in distinguishing women with ovulatory menstrual cycles from those without. PMID:22733707
Prediction of chronic post-operative pain: pre-operative DNIC testing identifies patients at risk.
Yarnitsky, David; Crispel, Yonathan; Eisenberg, Elon; Granovsky, Yelena; Ben-Nun, Alon; Sprecher, Elliot; Best, Lael-Anson; Granot, Michal
2008-08-15
Surgical and medical procedures, mainly those associated with nerve injuries, may lead to chronic persistent pain. Currently, one cannot predict which patients undergoing such procedures are 'at risk' to develop chronic pain. We hypothesized that the endogenous analgesia system is key to determining the pattern of handling noxious events, and therefore testing diffuse noxious inhibitory control (DNIC) will predict susceptibility to develop chronic post-thoracotomy pain (CPTP). Pre-operative psychophysical tests, including DNIC assessment (pain reduction during exposure to another noxious stimulus at remote body area), were conducted in 62 patients, who were followed 29.0+/-16.9 weeks after thoracotomy. Logistic regression revealed that pre-operatively assessed DNIC efficiency and acute post-operative pain intensity were two independent predictors for CPTP. Efficient DNIC predicted lower risk of CPTP, with OR 0.52 (0.33-0.77 95% CI, p=0.0024), i.e., a 10-point numerical pain scale (NPS) reduction halves the chance to develop chronic pain. Higher acute pain intensity indicated OR of 1.80 (1.28-2.77, p=0.0024) predicting nearly a double chance to develop chronic pain for each 10-point increase. The other psychophysical measures, pain thresholds and supra-threshold pain magnitudes, did not predict CPTP. For prediction of acute post-operative pain intensity, DNIC efficiency was not found significant. Effectiveness of the endogenous analgesia system obtained at a pain-free state, therefore, seems to reflect the individual's ability to tackle noxious events, identifying patients 'at risk' to develop post-intervention chronic pain. Applying this diagnostic approach before procedures that might generate pain may allow individually tailored pain prevention and management, which may substantially reduce suffering.
Optimized autonomous operations of a 20 K space hydrogen sorption cryocooler
NASA Astrophysics Data System (ADS)
Borders, J.; Morgante, G.; Prina, M.; Pearson, D.; Bhandari, P.
2004-06-01
A fully redundant hydrogen sorption cryocooler is being developed for the European Space Agency Planck mission, dedicated to the measurement of the temperature anisotropies of the cosmic microwave background radiation with unprecedented sensitivity and resolution [Advances in Cryogenic Engineering 45A (2000) 499]. In order to achieve this ambitious scientific task, this cooler is required to provide a stable temperature reference (˜20 K) and appropriate cooling (˜1 W) to the two instruments on-board, with a flight operational lifetime of 18 months. During mission operations, communication with the spacecraft will be possible in a restricted time-window, not longer than 2 h/day. This implies the need for an operations control structure with the required robustness to safely perform autonomous procedures. The cooler performance depends on many operating parameters (such as the temperatures of the pre-cooling stages and the warm radiator), therefore the operation control system needs the capability to adapt to variations of these boundary conditions, while maintaining safe operating procedures. An engineering bread board (EBB) cooler was assembled and tested to evaluate the behavior of the system under conditions simulating flight operations and the test data were used to refine and improve the operation control software. In order to minimize scientific data loss, the cooler is required to detect all possible failure modes and to autonomously react to them by taking the appropriate action in a rapid fashion. Various procedures and schemes both general and specific in nature were developed, tested and implemented to achieve these goals. In general, the robustness to malfunctions was increased by implementing an automatic classification of anomalies in different levels relative to the seriousness of the error. The response is therefore proportional to the failure level. Specifically, the start-up sequence duration was significantly reduced, allowing a much faster activation of the system, particularly useful in case of restarts after inadvertent shutdowns arising from malfunctions in the spacecraft. The capacity of the system to detect J-T plugs was increased to the point that the cooler is able to autonomously identify actual contaminants clogging from gas flow reductions due to off-nominal operating conditions. Once a plug is confirmed, the software autonomously energizes, and subsequently turns off, a J-T defrost heater until the clog is removed, bringing the system back to normal operating conditions. In this paper, all the cooler Operational Modes are presented, together with the description of the logic structure of the procedures and the advantages they produce for the operations.
Hydraulic impact end effector final test report. Automation and robotics section, ER/WM-AT Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Couture, S.
1994-02-18
One tool being developed for dislodging and fragmenting the hard salt cake waste in the single-shell nuclear waste tanks at the Hanford Reservation near Richland, Washington, is the hydraulic impact end effector (HIEE). This total operates by discharging 11-in. slugs of water at ultrahigh pressures. The HIEE was designed, built, and initially tested in 1992. Work in 1993 included advanced developments of the HIEE to further investigate its fragmentation abilities and to determine more effective operating procedures. These tests showed that more fragmentation can be achieved by increasing the charge pressure of 40 kpsi to 55 kpsi and by themore » use of different operating procedures. The size of the material and the impact energy of the water slug fired from the HIEE are believed to be major factors in material fragmentation. The material`s ability to fracture also appears to depend on the distance a fracture or crack line must travel to a free surface. Thus, larger material is more difficult to fracture than smaller material. Discharge pressures of 40 kpsi resulted in little penetration or fracturing of the material. At 55 kpsi, however, the size and depth of the fractures increased. Nozzle geometry had a significant effect on fragment size and quantity. Fragmentation was about an order of magnitude greater when the HIEE was discharged into drilled holes rather than onto the material surface. Since surface shots tend to create craters, a multi-shot procedure, coupled with an advanced nozzle design, was used to drill (crater) deep holes into large material. With this procedure, a 600-lb block was reduced to smaller pieces without the use of any additional equipment. Through this advanced development program, the HIEE has demonstrated that it can quickly fragment salt cake material into small, easily removable fragments. The HIEE`s material fragmentation ability can be substantially increased through the use of different nozzle geometries and operating procedures.« less
Definition study for an extended manned test of a regenerative life support system
NASA Technical Reports Server (NTRS)
1971-01-01
A program was defined which consists of extended ground-based manned tests of regenerative life support systems. The tests are to evaluate prototypes of advanced life support systems under operational, integrated conditions, thus providing data for the design of efficient environmental control and life support systems for use in long-duration space missions. The requirements are defined for test operations to provide a simulation of an orbiting space laboratory. The features of Phase A and B programs are described. These tests use proven backup equipment to ensure successful evaluation of the advanced subsystems. A pre-tests all-systems checkout period is provided to minimize equipment problems during extended testing and to familiarize all crew and operating staff members with test equipment and procedures.
Ride Dynamics and Evaluation of Human Exposure to Whole Body Vibration. Change 1
2012-04-03
vehicle specification and/or the detailed test plan. This (half-round obstacle) accelerometer will be low-pass filtered ( post test ) at 30 Hz...Engineers TARADCOM Tank-Automotive Research and Development Command TOP Test Operations Procedure VDV Vibration Dose Value WBV Whole Body...
Evaluating the Psychometric Characteristics of Generated Multiple-Choice Test Items
ERIC Educational Resources Information Center
Gierl, Mark J.; Lai, Hollis; Pugh, Debra; Touchie, Claire; Boulais, André-Philippe; De Champlain, André
2016-01-01
Item development is a time- and resource-intensive process. Automatic item generation integrates cognitive modeling with computer technology to systematically generate test items. To date, however, items generated using cognitive modeling procedures have received limited use in operational testing situations. As a result, the psychometric…
NASA Technical Reports Server (NTRS)
1971-01-01
A preliminary plan and procedure are presented for conducting an extended manned test program for a regenerative life support system. Emphasis will be placed on elements associated with long-term system operation and long-term uninterrupted crew confinement.
Fritz, Jan; U-Thainual, Paweena; Ungi, Tamas; Flammang, Aaron J.; Fichtinger, Gabor; Iordachita, Iulian I.
2012-01-01
Purpose: To prospectively assess overlay technology in providing accurate and efficient targeting for magnetic resonance (MR) imaging–guided shoulder and hip joint arthrography. Materials and Methods: A prototype augmented reality image overlay system was used in conjunction with a clinical 1.5-T MR imager. A total of 24 shoulder joint and 24 hip joint injections were planned in 12 human cadavers. Two operators (A and B) participated, each performing procedures on different cadavers using image overlay guidance. MR imaging was used to confirm needle positions, monitor injections, and perform MR arthrography. Accuracy was assessed according to the rate of needle adjustment, target error, and whether the injection was intraarticular. Efficiency was assessed according to arthrography procedural time. Operator differences were assessed with comparison of accuracy and procedure times between the operators. Mann-Whitney U test and Fisher exact test were used to assess group differences. Results: Forty-five arthrography procedures (23 shoulders, 22 hips) were performed. Three joints had prostheses and were excluded. Operator A performed 12 shoulder and 12 hip injections. Operator B performed 11 shoulder and 10 hip injections. Needle adjustment rate was 13% (six of 45; one for operator A and five for operator B). Target error was 3.1 mm ± 1.2 (standard deviation) (operator A, 2.9 mm ± 1.4; operator B, 3.5 mm ± 0.9). Intraarticular injection rate was 100% (45 of 45). The average arthrography time was 14 minutes (range, 6–27 minutes; 12 minutes [range, 6–25 minutes] for operator A and 16 minutes [range, 6–27 min] for operator B). Operator differences were not significant with regard to needle adjustment rate (P = .08), target error (P = .07), intraarticular injection rate (P > .99), and arthrography time (P = .22). Conclusion: Image overlay technology provides accurate and efficient MR guidance for successful shoulder and hip arthrography in human cadavers. © RSNA, 2012 Supplemental material: http://radiology.rsna.org/lookup/suppl/doi:10.1148/radiol.12112640/-/DC1 PMID:22843764
Exploring the initial steps of the testing process: frequency and nature of pre-preanalytic errors.
Carraro, Paolo; Zago, Tatiana; Plebani, Mario
2012-03-01
Few data are available on the nature of errors in the so-called pre-preanalytic phase, the initial steps of the testing process. We therefore sought to evaluate pre-preanalytic errors using a study design that enabled us to observe the initial procedures performed in the ward, from the physician's test request to the delivery of specimens in the clinical laboratory. After a 1-week direct observational phase designed to identify the operating procedures followed in 3 clinical wards, we recorded all nonconformities and errors occurring over a 6-month period. Overall, the study considered 8547 test requests, for which 15 917 blood sample tubes were collected and 52 982 tests undertaken. No significant differences in error rates were found between the observational phase and the overall study period, but underfilling of coagulation tubes was found to occur more frequently in the direct observational phase (P = 0.043). In the overall study period, the frequency of errors was found to be particularly high regarding order transmission [29 916 parts per million (ppm)] and hemolysed samples (2537 ppm). The frequency of patient misidentification was 352 ppm, and the most frequent nonconformities were test requests recorded in the diary without the patient's name and failure to check the patient's identity at the time of blood draw. The data collected in our study confirm the relative frequency of pre-preanalytic errors and underline the need to consensually prepare and adopt effective standard operating procedures in the initial steps of laboratory testing and to monitor compliance with these procedures over time.
[Comparison of two cesarean techniques: classic versus Misgav Ladach cesarean].
Moreira, P; Moreau, J C; Faye, M E; Ka, S; Kane Guèye, S M; Faye, E O; Dieng, T; Diadhiou, F
2002-10-01
The aim of the study was to compare two cesarean section techniques Methodology. A prospective study was conducted UB 400 cesareans performed at the Gynecological and Obstetric Clinic of the Dakar Teaching Hospital between March 2000 and August 2000. Two hundred patients underwent the classical procedure (CL group) and the other 200 the Misgav Ladach procedure (ML group). Per- and post-operative data were compared between the two groups with Student's test and the Chi(2) test. A p-value less than 0.05 was considered statistically significant. The two groups were similar for socio-demographic and clinical data. The delay between the skin incision and infant delivery was significantly shorter in the ML group (5 minutes 26 seconds versus 6 minutes 20 seconds). The same trend was found for the length of operation (36 minutes 36 seconds versus 54 minutes 38 seconds). Fewer sutures were used in the ML group (2.92 versus 4.14). There is no significant difference for dose of analgesia, post-operative complications and hospital discharge. Cost analysis demonstrated that the Misgav Ladach procedure was 10000 FCFA (15 euros) less costly. Misgav Ladach method is simple, rapid, cost-effective cesarean procedure which appears to be an attractive alternative to traditional cesarean section.
Overview of OHB Expertise on Mars Planetary Exploration Missions
NASA Astrophysics Data System (ADS)
Bergemann, C.; Muehlbauer, Q.; Paul, R.; Jaime, A.; Thiel, M.
2018-04-01
The first part provides an overview of the design and testing of the ExoMars SPDS. Lastly, lessons learned obtained from the sample testing are presented showing how operational procedures can optimize the system and solve occurring problems.
Development of maturity protocol for construction of NJDOT concrete structures
DOT National Transportation Integrated Search
1999-12-01
In-place tests can be used to estimate concrete strength during construction so that : construction operations can be performed safely or curing procedures can be terminated. : Compression tests pertaining to field cylinders do not represent the stre...
Redundancy approaches in bubble domain memories
NASA Technical Reports Server (NTRS)
Almasi, G. S.; Schuster, S. E.
1972-01-01
Fabrication of integrated circuit chips to compensate for faulty memory elements is discussed. Procedure for testing chips to determine extent of redundancy and faults is described. Mathematical model to define operation is presented. Schematic circuit diagram of test equipment is provided.
49 CFR 180.605 - Requirements for periodic testing, inspection and repair of portable tanks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... tank shows evidence of dents, corroded or abraded areas, leakage, or any other condition that might... transported; a leakage test; and a test of the satisfactory operation of all service equipment. Sheathing... material, the internal examination may be waived if it is leakage tested in accordance with the procedures...
40 CFR 86.336-79 - Diesel engine test cycle.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Diesel engine test cycle. 86.336-79... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.336-79 Diesel engine test cycle. (a) The following 13-mode cycle shall be followed in dynamometer operation...
NASA Technical Reports Server (NTRS)
2009-01-01
This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.
2015-03-12
R/ASR) 227/0 AGOR27 A031- 03 STD Report - TEST PROCEDURES ( 264-002-03 Waste Oil & Oily Waste Systems Operational Test)(R/ASR) 229/0 AGOR27...106/0 AGOR27 A031- 04 STD Report - TEST REPORT ( 529-004-3 Ballast Treatment System Demonstration)(R/ASR) 110/0 AGOR27 A031- 04 STD Report - TEST
40 CFR 1033.520 - Alternative ramped modal cycles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... warm it up. Then follow the provisions of 40 CFR part 1065, subpart F for general pre-test procedures (including engine and sampling system pre-conditioning). (d) Begin the test by operating the locomotive over the pre-test portion of the cycle. For locomotives not equipped with catalysts, you may begin the test...
40 CFR 1033.520 - Alternative ramped modal cycles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... warm it up. Then follow the provisions of 40 CFR part 1065, subpart F for general pre-test procedures (including engine and sampling system pre-conditioning). (d) Begin the test by operating the locomotive over the pre-test portion of the cycle. For locomotives not equipped with catalysts, you may begin the test...
40 CFR 1033.520 - Alternative ramped modal cycles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... warm it up. Then follow the provisions of 40 CFR part 1065, subpart F for general pre-test procedures (including engine and sampling system pre-conditioning). (d) Begin the test by operating the locomotive over the pre-test portion of the cycle. For locomotives not equipped with catalysts, you may begin the test...
40 CFR 1033.520 - Alternative ramped modal cycles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... warm it up. Then follow the provisions of 40 CFR part 1065, subpart F for general pre-test procedures (including engine and sampling system pre-conditioning). (d) Begin the test by operating the locomotive over the pre-test portion of the cycle. For locomotives not equipped with catalysts, you may begin the test...
Test Operations Procedure (TOP) 07-2-033 Weaponized Manned/Unmanned Aircraft
2013-01-14
Uncertainty Analysis ........................................................................... 24 6. PRESENTATION OF DATA...Testing. a. The purpose of testing is to confirm the predictions of engineering analysis , simulation, and subsystem tests. It is not to be... lunar illumination + 10 percent Laser hit point + 0.2 meter Sensor resolution target + 5 percent Weapon impact sequence High-speed
Test methods for optical disk media characteristics (for 356 mm ruggedized magneto-optic media)
NASA Technical Reports Server (NTRS)
Podio, Fernando L.
1991-01-01
Standard test methods for computer storage media characteristics are essential and allow for conformance to media interchange standards. The test methods were developed for 356 mm two-sided laminated glass substrate with a magneto-optic active layer media technology. These test methods may be used for testing other media types, but in each case their applicability must be evaluated. Test methods are included for a series of different media characteristics, including operational, nonoperational, and storage environments; mechanical and physical characteristics; and substrate, recording layer, and preformat characteristics. Tests for environmental qualification and media lifetimes are also included. The best methods include testing conditions, testing procedures, a description of the testing setup, and the required calibration procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... compliance with the emission limitations and the operating limits? 60.2932 Section 60.2932 Protection of... NEW STATIONARY SOURCES Operator Training and Qualification Continuous Compliance Requirements § 60... must be conducted using the test methods listed in table 1 of this subpart and the procedures in 60...
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance with the emission limitations and the operating limits? 60.2932 Section 60.2932 Protection of... NEW STATIONARY SOURCES Operator Training and Qualification Continuous Compliance Requirements § 60... must be conducted using the test methods listed in table 1 of this subpart and the procedures in 60...
Code of Federal Regulations, 2011 CFR
2011-07-01
... compliance with the emission limitations and the operating limits? 60.2932 Section 60.2932 Protection of... NEW STATIONARY SOURCES Operator Training and Qualification Continuous Compliance Requirements § 60... must be conducted using the test methods listed in table 1 of this subpart and the procedures in 60...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., definitions of Hazardous cargo, materials, substance or atmosphere and Ro-Ro operations). 1918.94 Section 1918..., materials, substance or atmosphere and Ro-Ro operations). (a) Ventilation with respect to carbon monoxide... employees are working by persons competent in the use of the test equipment and procedures. If operations...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., definitions of Hazardous cargo, materials, substance or atmosphere and Ro-Ro operations). 1918.94 Section 1918..., materials, substance or atmosphere and Ro-Ro operations). (a) Ventilation with respect to carbon monoxide... employees are working by persons competent in the use of the test equipment and procedures. If operations...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., definitions of Hazardous cargo, materials, substance or atmosphere and Ro-Ro operations). 1918.94 Section 1918..., materials, substance or atmosphere and Ro-Ro operations). (a) Ventilation with respect to carbon monoxide... employees are working by persons competent in the use of the test equipment and procedures. If operations...
NASA Technical Reports Server (NTRS)
Horst, R. L.; Nordstrom, M. J.
1972-01-01
An operation manual is presented for the oligatomic mass memory feasibility model. It includes a brief description of the memory and exerciser units, a description of the controls and their functions, the operating procedures, the test points and adjustments, and the circuit diagram.
Verification System: First System-Wide Performance Test
NASA Astrophysics Data System (ADS)
Chernobay, I.; Zerbo, L.
2006-05-01
System-wide performance tests are essential for the development, testing and evaluation of individual components of the verification system. In addition to evaluating global readiness it helps establishing the practical and financial requirements for eventual operations. The first system-wide performance test (SPT1) was conducted in three phases: - A preparatory phase in May-June 2004 - A performance testing phase in April-June 2005 - An evaluation phase in the last half of 2005. The preparatory phase was developmental in nature. The main objectives for the performance testing phase included establishment of performance baseline under current provisional mode of operation (CTBT/PC- 19/1/Annex II, CTBT/WGB-21/1), examination of established requirements and procedures for operation and maintenance. To establish a system-wide performance baseline the system configuration was fixed for April-May 2005. The third month (June 2005) was used for implementation of 21 test case scenarios to examine either particular operational procedures or the response of the system components to the failures simulated under controlled conditions. A total of 163 stations and 5 certified radionuclide laboratories of International Monitoring System (IMS) participated in the performance testing phase - about 50% of the eventual IMS network. 156 IMS facilities and 40 National Data Centres (NDCs) were connected to the International Data Centre (IDC) via Global Communication Infrastructure (GCI) communication links. In addition, 12 legacy stations in the auxiliary seismic network sent data to the IDC over the Internet. During the performance testing phase, the IDC produced all required products, analysed more than 6100 seismic events and 1700 radionuclide spectra. Performance of all system elements was documented and analysed. IDC products were compared with results of data processing at the NDCs. On the basis of statistics and information collected during the SPT1 a system-wide performance baseline under current guidelines for provisional Operation and Maintenance was established. The test provided feedback for further development of the draft IMS and IDC Operational Manuals and identified priority areas for further system development.
Flight Crew Survey Responses from the Interval Management (IM) Avionics Phase 2 Flight Test
NASA Technical Reports Server (NTRS)
Baxley, Brian T.; Swieringa, Kurt A.; Wilson, Sara R.; Roper, Roy D.; Hubbs, Clay E.; Goess, Paul A.; Shay, Richard F.
2017-01-01
The Interval Management (IM) Avionics Phase 2 flight test used three aircraft over a nineteen day period to operationally evaluate a prototype IM avionics. Quantitative data were collected on aircraft state data and IM spacing algorithm performance, and qualitative data were collected through end-of-scenario and end-of-day flight crew surveys. The majority of the IM operations met the performance goals established for spacing accuracy at the Achieve-by Point and the Planned Termination Point, however there were operations that did not meet goals for a variety of reasons. While the positive spacing accuracy results demonstrate the prototype IM avionics can contribute to the overall air traffic goal, critical issues were also identified that need to be addressed to enhance IM performance. The first category was those issues that impacted the conduct and results of the flight test, but are not part of the IM concept or procedures. These included the design of arrival and approach procedures was not ideal to support speed as the primary control mechanism, the ground-side of the Air Traffic Management Technology Demonstration (ATD-1) integrated concept of operations was not part of the flight test, and the high workload to manually enter the information required to conduct an IM operation. The second category was issues associated with the IM spacing algorithm or flight crew procedures. These issues include the high frequency of IM speed changes and reversals (accelerations), a mismatch between the deceleration rate used by the spacing algorithm and the actual aircraft performance, and some spacing error calculations were sensitive to normal operational variations in aircraft airspeed or altitude which triggered additional IM speed changes. Once the issues in these two categories are addressed, the future IM avionics should have considerable promise supporting the goals of improving system throughput and aircraft efficiency.
Usability of Operational Performance Support Tools - Findings from Sea Test II
NASA Technical Reports Server (NTRS)
Byrne, Vicky; Litaker, Harry; McGuire, Kerry
2014-01-01
Sea Test II, aka NASA Extreme Environment Mission Operations 17(NEEMO 17) took place in the Florida Aquarius undersea habitat. This confined underwater environment provides a excellent analog for space habitation providing similarities to space habitation such as hostile environment, difficult logistics, autonomous operations, and remote communications. This study collected subjective feedback on the usability of two performance support tools during the Sea Test II mission, Sept 10-14, 2013; Google Glass and iPAD. The two main objectives: - Assess the overall functionality and usability of each performance support tool in a mission analog environment. - Assess the advantages and disadvantages of each tool when performing operational procedures and Just-In-Time-Training (JITT).
[Determination of blood alcohol among aviation personnel: proposed operative protocol].
Lopez, A; Cardoni, F; Bova, M; Simonazzi, S; Romolo, F S; Ricciardi Tenore, G
2003-01-01
The problems of the use/abuse of alcohol need a special attention by the Public Authorities, based on the scientific evidences related to the subject. We would like to define in the present paper the procedures for alcohol testing (and drug testing) in the sailors, following the international aviation authorities (ICAO, JAR-OPS-1, FAA) recommendations. A Working Group was established to study both the scientific and the legal aspects of the problems related to alcohol testing in Italy. Experts from the Università "La Sapienza" and from Alitalia studied the alcohol testing issues abroad to set out criteria, guidelines and procedures for random testing in Italy.
Ortega, Joaquin; Cassinello, Norberto; Baltasar, Aniceto; Torres, Antonio J
2012-01-01
To standardise possible peri-operative bariatric surgery protocols, a survey was prepared to be filled in by members of the Spanish Society for Obesity (Sociedad Española de Cirugía de la Obesidad) (SECO), and to approve it at the XII National Congress. A total of 47 members of SECO from 14 autonomous communities responded, and it unanimously approved by the Congress. As highly recommended peri-operative procedures, were proposed: full laboratory analysis (98%) with an endocrine study (90%), ECG (96%), chest x-ray (98%), an oesophageal-gastric imaging test (endoscopy or gastro-duodenal transit study (98%), antibiotic prophylaxis (92%) and use of low molecular weight heparins pre-operatively (96%), and for 2 weeks (83%). Pre-surgical, abdominal ultrasound (86%), spirometry (80%), diet (88%) and psychological study (76%), and during surgery, use of elastic stockings (76%), leak tests (92%) and drainages (90%), were established as advisable procedures. Copyright © 2011 AEC. Published by Elsevier Espana. All rights reserved.
Solar Photovoltaic DC Systems: Basics and Safety: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
McNutt, Peter F; Sekulic, William R; Dreifuerst, Gary
Solar Photovoltaic (PV) systems are common and growing with 42.4 GW installed capacity in U.S. (almost 15 GW added in 2016). This paper will help electrical workers, and emergency responders understand the basic operating principles and hazards of PV DC arrays. We briefly discuss the following aspects of solar photovoltaic (PV) DC systems: the effects of solar radiation and temperature on output power; PV module testing standards; common system configurations; a simple PV array sizing example; NEC guidelines and other safety features; DC array commissioning, periodic maintenance and testing; arc-flash hazard potential; how electrical workers and emergency responders can andmore » do work safely around PV arrays; do moonlight and artificial lighting pose a real danger; typical safe operating procedures; and other potential DC-system hazards to be aware of. We also present some statistics on PV DC array electrical incidents and injuries. Safe PV array operation is possible with a good understanding of PV DC arrays basics and having good safe operating procedures in place.« less
Kirkwood, Melissa L; Guild, Jeffrey B; Arbique, Gary M; Tsai, Shirling; Modrall, J Gregory; Anderson, Jon A; Rectenwald, John; Timaran, Carlos
2016-11-01
A new proprietary image-processing system known as AlluraClarity, developed by Philips Healthcare (Best, The Netherlands) for radiation-based interventional procedures, claims to lower radiation dose while preserving image quality using noise-reduction algorithms. This study determined whether the surgeon and patient radiation dose during complex endovascular procedures (CEPs) is decreased after the implementation of this new operating system. Radiation dose to operators, procedure type, reference air kerma, kerma area product, and patient body mass index were recorded during CEPs on two Philips Allura FD 20 fluoroscopy systems with and without Clarity. Operator dose during CEPs was measured using optically stimulable, luminescent nanoDot (Landauer Inc, Glenwood, Ill) detectors placed outside the lead apron at the left upper chest position. nanoDots were read using a microStar ii (Landauer Inc) medical dosimetry system. For the CEPs in the Clarity group, the radiation dose to surgeons was also measured by the DoseAware (Philips Healthcare) personal dosimetry system. Side-by-side measurements of DoseAware and nanoDots allowed for cross-calibration between systems. Operator effective dose was determined using a modified Niklason algorithm. To control for patient size and case complexity, the average fluoroscopy dose rate and the dose per radiographic frame were adjusted for body mass index differences and then compared between the groups with and without Clarity by procedure. Additional factors, for example, physician practice patterns, that may have affected operator dose were inferred by comparing the ratio of the operator dose to procedural kerma area product with and without Clarity. A one-sided Wilcoxon rank sum test was used to compare groups for radiation doses, reference air kermas, and operating practices for each procedure type. The analysis included 234 CEPs; 95 performed without Clarity and 139 with Clarity. Practice patterns of operators during procedures with and without Clarity were not significantly different. For all cases, procedure radiation dose to the patient and the primary and assistant operators were significantly decreased in the Clarity group by 60% compared with the non-Clarity group. By procedure type, fluorography dose rates decreased from 44% for fenestrated endovascular repair and up to 70% with lower extremity interventions. Fluoroscopy dose rates also significantly decreased, from about 37% to 47%, depending on procedure type. The AlluraClarity system reduces the patient and primary operator's radiation dose by more than half during CEPs. This feature appears to be an effective tool in lowering the radiation dose while maintaining image quality. Copyright © 2016 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Schmitt, Kara Anne
This research aims to prove that strict adherence to procedures and rigid compliance to process in the US Nuclear Industry may not prevent incidents or increase safety. According to the Institute of Nuclear Power Operations, the nuclear power industry has seen a recent rise in events, and this research claims that a contributing factor to this rise is organizational, cultural, and based on peoples overreliance on procedures and policy. Understanding the proper balance of function allocation, automation and human decision-making is imperative to creating a nuclear power plant that is safe, efficient, and reliable. This research claims that new generations of operators are less engaged and thinking because they have been instructed to follow procedures to a fault. According to operators, they were once to know the plant and its interrelations, but organizationally more importance is now put on following procedure and policy. Literature reviews were performed, experts were questioned, and a model for context analysis was developed. The Context Analysis Method for Identifying Design Solutions (CAMIDS) Model was created, verified and validated through both peer review and application in real world scenarios in active nuclear power plant simulators. These experiments supported the claim that strict adherence and rigid compliance to procedures may not increase safety by studying the industry's propensity for following incorrect procedures, and when it directly affects the outcome of safety or security of the plant. The findings of this research indicate that the younger generations of operators rely highly on procedures, and the organizational pressures of required compliance to procedures may lead to incidents within the plant because operators feel pressured into following the rules and policy above performing the correct actions in a timely manner. The findings support computer based procedures, efficient alarm systems, and skill of the craft matrices. The solution to the problems facing the industry include in-depth, multiple fault failure training which tests the operator's knowledge of the situation. This builds operator collaboration, competence and confidence to know what to do, and when to do it in response to an emergency situation. Strict adherence to procedures and rigid compliance to process may not prevent incidents or increase safety; building operators' fundamental skills of collaboration, competence and confidence will.
Standardization and program effect analysis (Study 2.4). Volume 3: Design-to-cost analysis
NASA Technical Reports Server (NTRS)
Shiokari, T.
1975-01-01
The program procedures that were incorporated into an on-going "design-to-cost" spacecraft program are examined. Program procedures are the activities that support the development and operations of the flight unit: contract management, documents, integration meetings, engineering, and testing. This report is limited to the program procedures that were implemented, with emphasis on areas that may depart from normal satellite development practices.
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2012 CFR
2012-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
40 CFR 86.135-90 - Dynamometer procedure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup and operation over the first 505 seconds of the driving schedule complete the hot start test. The... 505 seconds of the driving schedule complete the hot start test. The exhaust emissions are diluted... over the prescribed driving schedule may be performed at test point, provided an emission sample is not...
Performance test for a solar water heater
NASA Technical Reports Server (NTRS)
1979-01-01
Two reports describe procedures and results of performance tests on domestic solar powered hot water system. Performance tests determine amount of energy collected by system, amount of energy delivered to solar source, power required to operate system and maintain proper tank temperature, overall system efficiency, and temperature distribution in tank.
Modeling and Assessment of Alternative Cooling Methods of the Combat Operation Center
2012-12-01
through the employment of a measure designed to remove heat load at a lower rate of power consumption than an ECU. 3. The Simulation To test the...24 G. PROCEDURE FOR TESTING PROPOSED SOLUTIONS .....................25 1. The Model...ASSUMPTIONS .............................................................................................28 1. July 2010 COC (v2) test
Flight Test Guide (Part 61 Revised): Instrument Pilot: Helicopter.
ERIC Educational Resources Information Center
Federal Aviation Administration (DOT), Washington, DC. Flight Standards Service.
The guide provides an outline of the skills required to pass the flight test for an Instrument Pilot Helicopter Rating under Part 61 (revised) of Federal Aviation Regulations. General procedures for flight tests are described and the following pilot operations outlined: maneuvering by reference to instruments, IFR navigation, instrument…
9 CFR 442.4 - Testing of scales.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Testing of scales. 442.4 Section 442.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE REGULATORY... LABELING AND PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.4 Testing of scales. (a) The operator...
9 CFR 442.4 - Testing of scales.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Testing of scales. 442.4 Section 442.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE REGULATORY... LABELING AND PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.4 Testing of scales. (a) The operator...
9 CFR 442.4 - Testing of scales.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Testing of scales. 442.4 Section 442.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE REGULATORY... LABELING AND PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.4 Testing of scales. (a) The operator...
9 CFR 442.4 - Testing of scales.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Testing of scales. 442.4 Section 442.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE REGULATORY... LABELING AND PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.4 Testing of scales. (a) The operator...
9 CFR 442.4 - Testing of scales.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Testing of scales. 442.4 Section 442.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE REGULATORY... LABELING AND PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.4 Testing of scales. (a) The operator...
NASA Technical Reports Server (NTRS)
1979-01-01
The thermal efficiency of the concentrating, tracking solar collector was tested after ten months of operation at the Marshall Space Flight Center solar house. The test procedures and results are presented.
21 CFR 606.100 - Standard operating procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... components from a donor who later tests reactive for evidence of human immunodeficiency virus (HIV) infection... establishment is made aware of other reliable test results or information indicating evidence of HIV or HCV... consignees of the results of the HIV or HCV testing performed on the donors of such blood and blood...
21 CFR 606.100 - Standard operating procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... components from a donor who later tests reactive for evidence of human immunodeficiency virus (HIV) infection... establishment is made aware of other reliable test results or information indicating evidence of HIV or HCV... consignees of the results of the HIV or HCV testing performed on the donors of such blood and blood...
21 CFR 606.100 - Standard operating procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... components from a donor who later tests reactive for evidence of human immunodeficiency virus (HIV) infection... establishment is made aware of other reliable test results or information indicating evidence of HIV or HCV... consignees of the results of the HIV or HCV testing performed on the donors of such blood and blood...
21 CFR 606.100 - Standard operating procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... components from a donor who later tests reactive for evidence of human immunodeficiency virus (HIV) infection... establishment is made aware of other reliable test results or information indicating evidence of HIV or HCV... consignees of the results of the HIV or HCV testing performed on the donors of such blood and blood...