Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan
Dan Bremer
2007-01-01
The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...
Management and operating contractors' pension plans
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1987-06-01
This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waite, J.L.
1996-04-12
This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
2015-08-27
ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure
Contractor and government - Teamwork and commitment
NASA Technical Reports Server (NTRS)
Griffin, G. D.
1985-01-01
Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.
Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.
1982-04-01
prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more
U.S. Northern Command > About USNORTHCOM > Doing Business with USNORTHCOM
Central Contractor Registration (CCR) http://www.ccr.gov Vendors should register in the U.S. federal government's Central Contractor Registration (CCR). A Data Universal Numbering System (DUNS®) number, provided planning and conducting contracting and contractor management functions in support of joint operations
Site support program plan for ICF Kaiser Hanford Company, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.
Test, Control and Monitor System maintenance plan
NASA Technical Reports Server (NTRS)
Buehler, David P.; Lougheed, M. J.
1993-01-01
The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.
MCC/shuttle test plan. Volume 1: Philosophy and guidelines
NASA Technical Reports Server (NTRS)
1976-01-01
The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.
Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deborah L. Layton; Kimberly Frerichs
2011-12-01
The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less
Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deborah L. Layton; Kimberly Frerichs
2010-07-01
The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less
2000-04-18
This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-02-23
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less
Subaru FATS (fault tracking system)
NASA Astrophysics Data System (ADS)
Winegar, Tom W.; Noumaru, Junichi
2000-07-01
The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.
Space station automation and robotics study. Operator-systems interface
NASA Technical Reports Server (NTRS)
1984-01-01
This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NGUYEN, D.M.
1999-06-01
The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assme appropriate data will be collected to support the activity, ''Confirm Tank Plans and Requirements.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2009.470 Appeals. A... for Operations. A copy of the notice of appeal must be furnished to the debarring/suspending official. ...
Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
Baseline Water Demand at Forward Operating Bases
2013-09-15
population, often equaling or exceeding the military population: • Brigade: 6000 soldiers • Battalion: 1000 soldiers • Company : 150 soldiers. ERDC/CERL TR...requirements for a company outpost (COP) of 120 personnel (PAX) in the format that the computer tool generates. This tool generates a basic sus...facilities world-wide through several large contractors. One contractor, Kellogg , Brown, and Root (KBR), used a minimum planning factor of 18.4
Airborne Oceanographic Lidar (AOL) (Global Carbon Cycle)
NASA Technical Reports Server (NTRS)
2003-01-01
This bimonthly contractor progress report covers the operation, maintenance and data management of the Airborne Oceanographic Lidar and the Airborne Topographic Mapper. Monthly activities included: mission planning, sensor operation and calibration, data processing, data analysis, network development and maintenance and instrument maintenance engineering and fabrication.
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
Work Zone Design and Operations Enhancements
DOT National Transportation Integrated Search
2010-02-01
Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...
Work zone and operation enhancements.
DOT National Transportation Integrated Search
2010-02-01
Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...
Analysis of Security Contractors in Deployed Environments
2006-12-01
35 2. Proper Training and Education .......................................................36 3. Improve Overall Contract Visibility...like to acknowledge the work of P. W. Singer , author of the book titled “Corporate Warriors,” whose dedicated research and thorough analysis on the...skills, including combat operations, strategic planning, intelligence, risk assessment, operational support, training , and technical skills.”3 CPFF
Alaska Department of Natural Resources
/08/2018 First Day Hikes planned in Delta Junction, Homer, Sitka, Ketchikan, and Juneau 12/27/2017 searchable online tool 07/31/2017 Contracts awarded for private operation of Delta Area state parks 07/31 Outdoor Recreation Director 07/06/2017 State seeks private contractors to operate Delta Area state parks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
1998-01-06
The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less
Work zone design and operation enhancements : final report, March 2010.
DOT National Transportation Integrated Search
2010-02-01
Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...
A New, Integrated Approach to Army Operational Testing and Evaluation
1977-11-04
simulation should be reviewed to determine if there are areas that may or could produce data to support OT. During the Validation Phase the operational...II must provide the data for a valid estimate of the system’s military utility, operational effectiveness and operational suitability (including...the necessity of planning to acquire supplementary data . This data may be derived by analysis or obtained in tests (contractor, development and/or
Risk Analysis of Return Support Material on Gas Compressor Platform Project
NASA Astrophysics Data System (ADS)
Silvianita; Aulia, B. U.; Khakim, M. L. N.; Rosyid, Daniel M.
2017-07-01
On a fixed platforms project are not only carried out by a contractor, but two or more contractors. Cooperation in the construction of fixed platforms is often not according to plan, it is caused by several factors. It takes a good synergy between the contractor to avoid miss communication may cause problems on the project. For the example is about support material (sea fastening, skid shoe and shipping support) used in the process of sending a jacket structure to operation place often does not return to the contractor. It needs a systematic method to overcome the problem of support material. This paper analyses the causes and effects of GAS Compressor Platform that support material is not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From fault tree analysis, the probability of top event is 0.7783. From event tree analysis diagram, the contractors lose Rp.350.000.000, - to Rp.10.000.000.000, -.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) The Contractor agrees as follows: (a) Planning. The Contractor shall develop a plan to assure that any... planning the meeting, conference, or seminar, shall include in all announcements and other materials... device for the deaf (TDD). (2) The Contractor shall provide, at no additional cost to the individual...
Common occupational classification system - revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stahlman, E.J.; Lewis, R.E.
1996-05-01
Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-11
...] Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or Other..., ``Contractor Personnel Authorized to Accompany the U.S. Armed Forces,'' which provides guidance for all DoD contractors operating in contingency operations. This Rule was published as an Interim Final Rule on July 17...
Using Heuristics for Supportability Analysis of Adaptive Weapon Systems in Combat
2017-01-01
a n/a Customer Requirements Im p o rt an ce w ei g ht f ac to r F o rc e to o p en E xt er na l d im en si o ns C D p o si ti o ni ng f ea tu...usually include Contractor Logistics Support (CLS), and the contract structure normally incentivizes CLS to exceed the KPP Operational Readiness...adaptive baseline, a viable plan for maximizing availability and reducing costs would involve an early design effort for replacing contractor maintenance
3718-F Alkali Metal Treatment and Storage Facility Closure Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less
48 CFR 1509.170-8 - Contractor Performance Report.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...
Decommissioning of the Northrop TRIGA reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cozens, George B.; Woo, Harry; Benveniste, Jack
1986-07-01
An overview of the administrative and operational aspects of decommissioning and dismantling the Northrop Mark F TRIGA Reactor, including: planning and preparation, personnel requirements, government interfacing, costs, contractor negotiations, fuel shipments, demolition, disposal of low level waste, final survey and disposition of the concrete biological shielding. (author)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa
This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, Roy Edward; Walker, Grant W.
2002-12-31
Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.
Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farmer, Carl J.
Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa
Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less
40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...
40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...
ERIC Educational Resources Information Center
Osborn, John E.
2005-01-01
School districts operate under bidding laws that, in many cases, restrict the flexibility they have in pre-qualifying contractors and limit choices in project-delivery methods. Because the legal impediments imposed on school districts are not likely to change, it is essential that institutions focus on more effective planning and troubleshooting.…
48 CFR 945.570-8 - Reporting motor vehicle data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... data. 945.570-8 Section 945.570-8 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT... Reporting motor vehicle data. (a) Contractors conducting motor vehicle operations shall forward annually (on... for the preparation of the plan will be issued by the contracting officer, as required. (b...
48 CFR 945.570-8 - Reporting motor vehicle data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... data. 945.570-8 Section 945.570-8 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT... Reporting motor vehicle data. (a) Contractors conducting motor vehicle operations shall forward annually (on... for the preparation of the plan will be issued by the contracting officer, as required. (b...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
Starting at the End When Planning for Base Closure
2016-05-17
order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was
48 CFR 3009.171-8 - Ineligible contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...
48 CFR 945.570-8 - Reporting motor vehicle data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Reporting motor vehicle... Reporting motor vehicle data. (a) Contractors conducting motor vehicle operations shall forward annually (on or before December 1) to the contracting officer their plan for acquisition of motor vehicles for the...
Chronology of a Successful Conversion--Contractor Revives School Lunch Program.
ERIC Educational Resources Information Center
Johnston, James B.
1994-01-01
A New York State school district employed a management company to privatize the food-service program with the goal of enticing all students to eat lunch. Expertise in marketing, menu planning, and food-service operation turned the program around. Suggests questions to ask when selecting a management company. (MLF)
44 CFR 351.24 - The Department of Energy.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...
44 CFR 351.24 - The Department of Energy.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...
44 CFR 351.24 - The Department of Energy.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...
44 CFR 351.24 - The Department of Energy.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...
44 CFR 351.24 - The Department of Energy.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...
48 CFR 970.5226-1 - Diversity plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... clause: Diversity Plan (DEC 2000) The Contractor shall submit a Diversity Plan to the Contracting Officer... appropriate). The Contractor shall submit an update to its Plan annually or with its annual fee proposal... innovative strategies for increasing opportunities to fully use the talents and capabilities of a diverse...
41 CFR 60-4.5 - Hometown plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Hometown plans. 60-4.5...-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.5 Hometown plans. (a) A contractor participating, either individually or through an association, in an approved Hometown Plan (including heavy...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
White, Kari; Hopkins, Kristine; Grossman, Daniel; Potter, Joseph E
2017-10-20
To explore organizations' experiences providing family planning during the first year of an expanded primary care program in Texas. Between November 2014 and February 2015, in-depth interviews were conducted with program administrators at 30 organizations: 7 women's health organizations, 13 established primary care contractors (e.g., community health centers, public health departments), and 10 new primary care contractors. Interviews addressed organizational capacities to expand family planning and integrate services with primary care. Interview transcripts were analyzed using a theme-based approach. Themes were compared across the three types of organizations. Established and new primary care contractors identified several challenges expanding family planning services, which were uncommon among women's health organizations. Clinicians often lacked training to provide intrauterine devices and contraceptive implants. Organizations often recruited existing clients into family planning services, rather than expanding their patient base, and new contractors found family planning difficult to integrate because of clients' other health needs. Primary care contractors frequently described contraceptive provision protocols that were not evidence-based. Many primary care organizations in Texas initially lacked the capacity to provide evidence-based family planning services that women's health organizations already provided. © Health Research and Educational Trust.
... My Home? Radon Guide for Tenants Builders and Contractors Radon-Resistant Construction Basics and Techniques EPA's Directory of Builders Resources for Builders and Contractors Radon Action Plans The National Radon Action Plan ( ...
Development and validation of a strategic repositioning model for defense and aerospace contractors
NASA Astrophysics Data System (ADS)
Bers, John A.
Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.
48 CFR 970.4402 - Contractor purchasing system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...
48 CFR 42.402 - Visits to contractors' facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors... contractors' facilities. (a) Government personnel planning to visit a contractor's facility in connection with... positions, and security clearances. (2) Date and duration of visit. (3) Name and address of contractor and...
48 CFR 1609.471 - Contractor certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...
Creating a competitive PSO: a case study.
Calvaruso, J T
1999-06-01
Mount Carmel Health System, an integrated delivery system in Columbus, Ohio, became a Medicare+Choice contractor in response to unsatisfactory payment proposals from the Medicare contractors it serviced and to compete with the increasing number of managed care providers in its market. To meet HCFA's operational requirements, Mount Carmel upgraded and expanded its administrative and health information systems and solicited the support of its network physicians. It also developed a marketing strategy to promote its health plan. In the two years after instituting its provider-sponsored organization, Mount Carmel surpassed its original enrollment projections, decreased its patient management and utilization costs, and increased payments to its network members.
Insurance and indemnification implications of future space projects
NASA Technical Reports Server (NTRS)
O'Brien, John E.
1987-01-01
NASA options regarding insurance and indemnification policies as they relate to NASA customers and contractors are described. The foundation for the discussion is the way in which NASA is planning to return the Space Shuttle fleet to safe flight as well as current U.S. policy concerning future uses of the Shuttle fleet. Issues discussed include: the nature of the Shuttle manifest; the policy regarding property damage or destruction; insurance against liability to third parties; the reduction of the scope of the risk to be insured; NASA as the insurer; a sharing arrangement between the user and NASA; and contractors and subcontractors involved in Shuttle operations.
Enabling Operational Reach and Endurance: The Use of Contractors During World War II
2016-05-26
Enabling Operational Reach and Endurance: The Use of Contractors During World War II A...TITLE AND SUBTITLE 5a. CONTRACT NUMBER Enabling Operational Reach and Endurance: The Use of Contractors During World War II 5b. GRANT NUMBER 5c...Army Operating Concept does not address the use or incorporation of contractors to augment force structure in the event of a militarized response
48 CFR 1509.170-4 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... each performance category. Ratings are defined as follows: 0 = unsatisfactory, 1 = poor, 2 = fair, 3... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-4 Definitions. (a) Contractor Performance Report is an evaluation of a contractor's performance for a specified period of time...
48 CFR 970.4402-2 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402-2 General requirements. The following shall apply to the purchasing systems of management and operating contractors: (a) The objective of a management and operating contractor's purchasing system is to...
48 CFR 8.406-7 - Contractor Performance Evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...
Predictive Engineering Implementation at KSC
NASA Technical Reports Server (NTRS)
Mosconi, Jane; Schafer, Loraine
1995-01-01
This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.
2017-03-07
H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee
75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 1509.170-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-2 Purpose. This subpart provides guidance to program and contracting personnel regarding the evaluation of contractor performance. It...
2003-09-17
KENNEDY SPACE CENTER, FLA. - Suzy Cunningham sings the national anthem to kick off Center Director Jim Kennedy’s first all-hands meeting conducted for employees. She is senior spaceport manager, NASA/Air Force Spaceport Planning and Customer Service Office. Making presentations were Dr. Woodrow Whitlow Jr., KSC deputy director; Tim Wilson, assistant chief engineer for Shuttle; and Bill Pickavance, vice president and deputy program manager, Florida operations, United Space Alliance. Representatives from the Shuttle program and contractor team were on hand to discuss the Columbia Accident Investigation Board report and where KSC stands in its progress toward return to flight.
Karra, Vijia K
2005-01-01
Mining injury surveillance data are used as the basis for assessing the severity of injuries among operator and contractor employees in the underground and surface mining of various minerals. Injury rates during 1983-2002 derived from Mine Safety and Health Administration (MSHA) database are analyzed using the negative binomial regression model. The logarithmic mean injury rate is expressed as a linear function of seven indicator variables representing Non-Coal Contractor, Metal Operator, Non Metal Operator, Stone Operator, Sand and Gravel Operator, Coal Contractor, and Work Location, and a continuous variable, RelYear, representing the relative year starting with 1983 as the base year. Based on the model, the mean injury rate declined at a 1.69% annual rate, and the mean injury rate for work on the surface is 52.53% lower compared to the rate for work in the underground. With reference to the Coal Operator mean injury rate: the Non-Coal Contractor rate is 30.34% lower, the Metal Operator rate is 27.18% lower, the Non-Metal Operator rate is 37.51% lower, the Stone Operator rate is 23.44% lower, the Sand and Gravel Operator rate is 16.45% lower, and the Coal Contractor rate is 1.41% lower. Fatality rates during the same 20 year period are analyzed similarly using Poisson regression model. Based on this model, the mean fatality rate declined at a 3.17% annual rate, and the rate for work on the surface is 64.3% lower compared to the rate for work in the underground. With reference to the Coal Operator mean fatality rate: the Non-Coal Contractor rate is 234.81% higher, the Metal Operator rate is 5.79% lower, the Non-Metal Operator rate is 47.36% lower, the Stone Operator rate is 8.29% higher, the Sand and Gravel Operator rate is 60.32% higher, and the Coal Contractor rate is 129.54% higher.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... Male, Non-US Citizen, Criminal Aliens at a Contractor-Owned, Contractor-Operated Correctional Facility... aliens within one existing contractor owned, contractor operated facility. Background Information Growth... criminal aliens. In response, the BOP is seeking flexibility in managing its current shortage of beds by...
EG&G Florida, Inc., KSC base operations contractor Launch Readiness Assessment System
NASA Technical Reports Server (NTRS)
Geaslen, W. D.
1988-01-01
A computerized Launch Readiness Assessment System (LRAS) which compares 'current status' of readiness against the 'required status' of readiness for the Space Shuttle. The five subsystems of the LRAS are examined in detail. The LRAS Plan specifies the overall system requirements, procedures, and reports. The LRAS Manager drives the operation of the LRAS system. The Responding Units (RU) maintain support plans and procedures which specify the detail requirements for each mission or milestone. The Master Data Tables contain the milestone, responsible RU relationships, and requirements assessment categories. The LRAS Status System serves as the launch readiness assessment reporting system. The relationships between these subsystems are displayed in diagrams.
48 CFR 1509.170-1 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-1 Section 1509.170-1 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-1 Scope of subpart. This subpart establishes EPA policy and procedures for evaluation of contractor performance...
Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less
Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Shane
Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less
48 CFR 1509.170-3 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-3 Applicability. (a) This....604 provides detailed instructions for architect-engineer contractor performance evaluations. (b) The... simplified acquisition procedures do not require the creation or existence of a formal database for past...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Chemical Hygiene and Safety Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berkner, K.
The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through trainingmore » and the Plan will serve as a the framework and reference guide for that training.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... and operating contracts, for-profit contractor, non-technology transfer. 970.5227-11 Section 970.5227...-technology transfer. Insert the following clause in solicitations and contracts in accordance with 970.2703-1(b)(4): Patent Rights—Management and Operating Contracts, for-Profit Contractor, Non-Technology...
An Operational Commander’s Guide to Contractors on the Battlefield
2007-05-10
Operational Law Handbook, Charlottesville, VA: 2005, 145. 12 R. R. Vernon, “Battlefield Contractors: Facing Tough Issues,” Public Contract Law Journal...Operations. Joint Pub 4-0. Washington, DC: 6 April 2000. Vernon, R. R. “Battlefield Contractors: Facing Tough Issues.” Public Contract Law Journal, Vol. 33 (Winter 2004): 404-421.
Simulation of tunneling construction methods of the Cisumdawu toll road
NASA Astrophysics Data System (ADS)
Abduh, Muhamad; Sukardi, Sapto Nugroho; Ola, Muhammad Rusdian La; Ariesty, Anita; Wirahadikusumah, Reini D.
2017-11-01
Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.
NASA Technical Reports Server (NTRS)
1979-01-01
Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.
NASA Technical Reports Server (NTRS)
1971-01-01
The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.
48 CFR 1509.170-7 - Release of ratings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of... contacting the EPA contracting officer responsible for the evaluation. (b) Contractors' performance ratings... contract is located. Requests for past performance evaluations during the period the information may be...
48 CFR 1509.170-6 - Filing of forms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...
Chemical Stockpile Disposal Program. Monitoring Concept Plan
1987-09-10
Government Owned Contractor Operated GPL General Population Limit H Bis (2-chloroethyl) sulfide or Levinstein Mustard (75% purity) P HCI Hydrogen Chloride... government agencies, will provide technical expertise and equipment necessary to monitor affected areas and resources. 2-25 SECTIO 3 PROCESS CONTROL AND...conditions and to issue correct emergency response notifications, if required. The process sensors work in conjunction with the process control system and
48 CFR 253.209-1 - Responsible prospective contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... required service. (B) Production capability. An evaluation of the prospective contractor's ability to plan.... (C) Quality assurance capability. An assessment of the prospective contractor's capability to meet the quality assurance requirements of the proposed contract. It may involve an evaluation of the...
48 CFR 1509.170-7 - Release of ratings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Performance System will have direct access to all Reports, including those of EPA, in the National Institutes of Health's database. Information on EPA contractors' performance ratings may also be obtained by... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of...
48 CFR 52.219-16 - Liquidated Damages-Subcontracting Plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... following clause: Liquidated Damages—Subcontracting Plan (JAN 1999) (a) Failure to make a good faith effort... has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have...
Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed
NASA Technical Reports Server (NTRS)
Dunn, Steven C.; Schlank, John J.
2010-01-01
In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.
Guide to good practices for operations and administration updates through required reading
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-01
This Guide to Good Practices is written to enhance understanding of, and provide direction for, Required Reading, Chapter XIV of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing programs for updating personnel with operations and administration information through required reading. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Required Reading is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated requiredmore » reading program to promote safe and efficient operations.« less
NASA Technical Reports Server (NTRS)
1973-01-01
Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army.more » After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses an area of approximately 15,546 acres. The primary mission of LSAAP is to load, assemble and pack ammunition and ammunition components for the Army.« less
2016-12-01
relating to security force assistance activities and readiness of U.S. Special Operations Forces. • Increased Use of Contractors and Personnel on...Temporary Duty. DOD relies on contractors to support a wide range of military operations and free up uniformed personnel to directly support mission...needs. During operations in Afghanistan and Iraq contractor personnel played a critical role in supporting U.S. troops and sometimes exceeded the
30 CFR 45.4 - Independent contractor register.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...
Special Inspector General for Afghanistan Reconstruction (SIGAR)
2013-01-30
to MAIL to provide rapid disbursement of loans across the agricultural value chain through banks, farm stores, leasing companies, and food pro ...educated, and pro - fessional staff in order to plan and execute operations at a requisite pace.”23 Routine support for the ANSF also poses a capacity...of vehicles receiving maintenance, (2) the contractor performed within the terms and conditions of the contract, and (3) DoD agencies pro - vided
1985-01-01
The US Agency for International Development (AID) has discontinued its contraceptive social marketing project in Ecuador after 2 1/2 years without a sale. USAID had awarded a 3-year US$1.2 million grant to the program's contractor, the John Snow Public Health Group Inc. The project was run by Ecuador's national family planning association. This is only the 3rd time USAID has terminated a social marketing program since entering this field in 1973. Impediments to the program's operation included product price hikes and supply shortages as a result of teh inflation and currency devaluation in Ecuador in recent years. Government opposition to the sales of donated contraceptive supplies further set back the program. The name chosen for the condom distributed by the program, Liber, had to be changed since a company importing sanitary napkins was using the name Liberty and objected. The program's peculiar organizational structur is also considered to have played a role in the program's failure. Rather than having a single authority responsible for the program, a 2-headed organizational design was used. Program funds were controlled by the contractor, but the family planning organization managed day to day operations. Unified management has enabled programs in other countries to survive problems such as inflation, brand registration, and product and price approvals.
Operational Readiness Review Final Report for K Basin Fuel Transfer System
DOE Office of Scientific and Technical Information (OSTI.GOV)
DAVIES, T.H.
2002-10-01
An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan ofmore » Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR Team did not have the opportunity to observe a shift turnover from one crew to another. The ORR Team has evaluated the risk of not observing this activity and considers the risk to be minimal based on the fact that operating staff are very familiar with the FTS equipment and its procedures, and because existing Conduct of Operations processes and procedures are adequate and implemented. Because the ORR Team has not observed two-shift FTS operations, we recommend that additional RL oversight be provided at the start of two-shift FTS operations to evaluate the adequacy of crew turnovers.« less
48 CFR 970.5244-1 - Contractor purchasing system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
48 CFR 509.105-1 - Obtaining information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 509.105-1... any appropriate activities, e.g., legal counsel, quality control, contract management, credit and...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.
Code of Federal Regulations, 2011 CFR
2011-10-01
... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...
48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.
Code of Federal Regulations, 2010 CFR
2010-10-01
... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...
48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.
Code of Federal Regulations, 2013 CFR
2013-10-01
... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...
48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.
Code of Federal Regulations, 2014 CFR
2014-10-01
... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...
48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.
Code of Federal Regulations, 2012 CFR
2012-10-01
... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
49 CFR 199.245 - Contractor employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...
48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).
Code of Federal Regulations, 2010 CFR
2010-10-01
..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...
49 CFR 199.115 - Contractor employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...
NASA Astrophysics Data System (ADS)
Lyon, P. E.; Arnone, R.
2006-12-01
The Naval Research Laboratory at Stennis Space Center (NRLSSC) is preparing to produce optical products for Naval operations support from the National Polar-orbiting Operational Environmental Satellite System (NPOESS). This effort will leverage existing hardware and software systems in place at NRLSSC which are currently used to produce optical products from current sensors SeaWiFS and MODIS Aqua/Terra. This effort is part of an inter agency collaboration between NASA, NOAA, IPO, NRL and the prime contractor for NPOESS, Northrop Grumman / Raytheon. This poster presents an outline of the NRLSSC's plan for achieving the best possible optical products from NPOESS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NGUYEN, D.M.
1999-06-01
The U.S. Department of Energy-Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of high-level waste (HLW) that is currently managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver HLW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD) for HLW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed (RTP) deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of HLW feed to the Privatization Contractor. The scenario specifies tanks from which HLW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Tank TI is Acceptable for Feed,'' was identified to verify the basis used to develop the scenario Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assure appropriate data will be collected to support the activity, ''Confirm Tank T is Acceptable for HLW Feed.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less
23 CFR 646.105 - Contractor's public liability and property damage insurance.
Code of Federal Regulations, 2011 CFR
2011-04-01
... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...
23 CFR 646.105 - Contractor's public liability and property damage insurance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... safety of the offshore facility, including ensuring that all contractors and subcontractors have safety... safety analysis (task level); (3) Procedures to verify that contractors are conducting their activities in accordance with the operator's SEMS program and an evaluation to ensure that contractors have the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2014 CFR
2014-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2013 CFR
2013-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
Code of Federal Regulations, 2012 CFR
2012-10-01
... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...
48 CFR 244.305-70 - Granting, withholding, or withdrawing approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... or planned decision to grant or withhold approval of the contractor's purchasing system. (b) The PSA... contractor of the decision within ten days after receipt of the report with a copy of the decision to the PSA... request the PSA to verify that the contractor has— (i) Corrected the deficiencies; and (ii) Implemented...
2017-01-30
Nontraditional Defense Contractor Participation, and Plans for Next Quarter. II. Business Status Report. The business status report shall provide...DoD & DoD Contractors only. E. FINAL BUSINESS STATUS REPORT At the completion of the Ordnance Technology Initiative Agreement, the...traditional Contractors to produce advanced machining techniques that are required by the SPS group. • Provide acquisition support for reducing
48 CFR 209.570-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... prospective contractor meets the definition of “lead system integrator”; (2) Consider all information... workforce or a system engineering and technical assistance contractor; (2) Shall include a plan for phasing...
48 CFR 1509.505-4 - Obtaining access to proprietary information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.505-4 Obtaining access to proprietary information. Contractors gaining access to confidential business... business information. ...
Intelsat satellite scheduled for launch
NASA Technical Reports Server (NTRS)
1981-01-01
The launch schedule for Intelsat 5-B, the prime Intelsat satellite to provide communications services between the Americas, Europe, the Middle East, and Africa, is presented. The planned placement of the satellite into an elliptical transfer orbit, and circularization of the orbit at geosynchronous altitude over the equator are described. Characteristics of the Atlas Centaur launch vehicle, AC-56, are given. The launch operation is summarized and the launch sequence presented. The Intelsat team and contractors are listed.
4 CFR 83.19 - Government contractors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 4 Accounts 1 2010-01-01 2010-01-01 false Government contractors. 83.19 Section 83.19 Accounts... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel... of this part to be applied to such system. Any such contractor and any employee of such contractor...
Idaho National Laboratory Site Pollution Prevention Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. D. Sellers
2007-03-01
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less
48 CFR 1409.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.405 Effect of listing. When a CO finds that a compelling reason exists to conduct business with a contractor listed on...
Alternative Fuels Data Center: Installing New E85 Equipment
"milk run"). Hiring a Project Contractor In most cases, a fleet operator hires a project contractor to alter the onsite fueling system. This is often done through a bid process, especially if it is a fueling site operated by a government entity. The contractor is responsible for project oversight
Hanford facility dangerous waste permit application, general information portion. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sonnichsen, J.C.
1997-08-21
For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less
48 CFR 970.5203-3 - Contractor's organization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...
48 CFR 970.4401-2 - Review and approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing... contract; (2) The size, experience, ability, reliability, and organization of the management and operating contractor's purchasing function; (3) The internal controls, procedures, and organizational stature of the...
Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.;
1996-01-01
At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.
48 CFR 970.5244-1 - Contractor purchasing system.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970... management system. The Contractor's approved purchasing system and methods shall include the requirements set... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contractor purchasing...
48 CFR 923.102 - Applicability to contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... 923.102 Applicability to contractors. Many of the Department's major facilities are operated by contractors. Provisions regarding those contracts may be found at Part 970 of this chapter. At other locations...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...
Apache sharply expands western Egypt acreage position
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-02-10
Apache Corp. became Egypt`s second largest acreage holder with acquisition of Mobil Corp.`s nonoperating interests in three western desert exploration concessions covering a combined 7.7 million gross acres. Apache assumed a 50% contractor interest in the Repsol SA operated East Bahariya concession, a 33% contractor interest in the Repsol operated West Mediterranean Block 1 concession, and a 24% contractor interest in the Royal Dutch/Shell operated Northeast Abu Gharadig concession. The concessions carry a total drilling obligation of 11 wells the next 3 years.
Nuclear reactors built, being built, or planned, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-07-01
This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1994. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: a commercial reactor locator map and tables of the characteristicmore » and statistical data that follow; a table of abbreviations; tables of data for reactors operating, being built, or planned; and tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company -- working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less
Nuclear reactors built, being built, or planned: 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
This report contains unclassified information about facilities built, being built, or planned in the US for domestic use or export as of December 31, 1995. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristicmore » and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company--working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less
77 FR 52107 - Air Traffic Data in the Possession of Government Contractors
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... Government Contractors AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice. SUMMARY: The... possession of government contractors providing operational services to the FAA. This notice specifies how and... contractors. SUPPLEMENTARY INFORMATION: A. Background On August 3, 2012, the Pilot's Bill of Rights, Public...
48 CFR 43.104 - Notification of contract changes.
Code of Federal Regulations, 2013 CFR
2013-10-01
... contractor considers that the Government has effected or may effect a change in the contract that has not... plan for its funding; (2) countermand the alleged change; or (3) notify the contractor that no change...
48 CFR 43.104 - Notification of contract changes.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contractor considers that the Government has effected or may effect a change in the contract that has not... plan for its funding; (2) countermand the alleged change; or (3) notify the contractor that no change...
32 CFR 310.12 - Government contractors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...
18 CFR 3b.4 - Government contractors.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...
32 CFR 310.12 - Government contractors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 2 2013-07-01 2013-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...
32 CFR 310.12 - Government contractors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 2 2011-07-01 2011-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...
32 CFR 310.12 - Government contractors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 2 2012-07-01 2012-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...
32 CFR 310.12 - Government contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Contractors. 1701.16 Section 1701.16 National... Under the Privacy Act of 1974 § 1701.16 Contractors. (a) Any approved contract for the operation of a... prescribed by the Federal Acquisition Regulations (FAR) at 48 CFR part 24, requiring the contractor to comply...
18 CFR 3b.4 - Government contractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...
28 CFR 513.36 - Government contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Government contractors. 513.36 Section... contractors. (a) No Bureau component may contract for the operation of a record system by or on behalf of the... component shall have the responsibility to ensure that the contractor complies with the contract...
Issues With Access to Acquisition Data and Information in the Department of Defense
2017-01-01
both procurement and operations), technical performance, contracts and contractor performance, and program decision memo- randa. These data are...the cost of weapon systems (both procurement and operations), techni- cal performance, contracts and contractor performance, and program decision...and tracking sensitive data, and 19 percent have no method at all (Trustwave, 2014, p. 4; Kerner, 2014). U.S. defense contractors face similar
48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371 Conduct of employees of DOE...
Department of Defense Contractor and Troop Levels in Iraq and Afghanistan: 2007-2016
2016-08-15
Department of Defense Contractor and Troop Levels in Iraq and Afghanistan: 2007-2016 Heidi M. Peters, Coordinator Information Research......1 The Role of Contractors in Military Operations .............................................................................. 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwager, K.; Green, T. M.
The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened,more » and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.« less
Fiscal Year 2014: Comprehensive Oversight Plan for Southwest Asia
2013-09-30
rule of law. We plan to focus primarily on DOS Bureau of International Narcotics and Law Enforcement (INL) Justice Sector Support Program ( JSSP ...Specifically, (1) assess whether JSSP contractor(s) provided qualified trainers and services in accordance with the terms of the contract(s); (2...and USAID justice sector training efforts and determine the extent to which these programs complement the JSSP . (Project: SIGAR-073A) Dec-12 Oct-13
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.
Environmental considerations for 3D seismic in Louisianna wetlands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Browning, G.; Dillane, T.; Baaren, P. van
1996-11-01
Louisiana swamps have been host to seismic crews for many years. Results from recent 3D surveys indicate that well planned and executed seismic operations have a minimal and short term impact in these environmentally sensitive wetlands. Pre-planning identifies challenges that require use of improved technology and work procedures. These include multi-channel radio telemetry recording systems, ramming of dynamite and hydrophones as opposed to drilling, DGPS positioning and coordinated use of Airboats, buggies and helicopters. In addition to minimal environmental impact, increased data quality, reduced cost and shorter project duration have been achieved as a result of these efforts. Unlike 2Dmore » surveys, where profile positioning is flexible, 3D surveys involve high density coverage over many square miles operated by numerous personnel. Survey design includes minimizing repeated traffic and crossing points. Survey operations require environmental participation and commitment from every person involved in the project. This includes a thorough orientation and training program with strong emphasis on environmental sensitivity and awareness. Close co-ordination between regulatory agencies, clients and the contractor is a key factor in all aspects of the survey planning and operation. Benefits from these efforts are significant, measurable and continue to improve.« less
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Conduct of employees of DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...
48 CFR 970.0371-7 - Outside employment of contractor employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business.... Employees of a management and operating contractor are entitled to the same rights and privileges with... full or part-time basis under a DOE management and operating contract may engage in employment outside...
Contractors are cautiously optimistic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stremel, K.
1984-10-01
Anticipating stable crew counts and marginal increases in operator exploration budgets, geophysical contractors are cautiously optimistic about continued industry growth. Most companies are operating on lean profits, and more business consolidations are expected as the market gradually rebounds. Prospects for an upturn in geophysical operations by oil companies are discussed.
Assessment of Navy Contract Management Processes
2016-04-30
Defense (DoD) and defense contractor organizational contract management process capability. The CMMM has been previously applied at Air Force, Army...Navy, and defense contractor organizations. Specific to the Navy, assessments were conducted at three Navy contracting centers using the CMMM. These...agency’s poor contract planning, contract administration, and contractor oversight (DoDIG, 2009, 2012, 2013, 2014). The DoD’s response to the GAO’s high
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...
Battlefield Contractors: Operational Risk and System Support Contractors
2010-10-27
incentive for the use of contractors is the proven cost savings when compared to similarly trained active duty military forces. The Office of...no military or government civilian is trained to do. The reality is that “modern military operations now depend heavily on high-tech weapons systems...squadrons that rely exclusively on contracted line maintenance, with no military personnel trained to support the aircraft. Defense supplemental funds
HOW THE MILITARY CAN INTEGRATE UNMANNED AERIAL SYSTEMS IN THE CIVIL RESERVE AIR FLEET
2016-10-01
brings new capabilities and continues to fundamentally impact military doctrine and strategy, particularly in how civilian operators or contractors ...missions has stretched military personnel and resources thin. General Atomics, a California-based defense contractor , produces the highly successful MQ-1...and a large number of support personnel required to operate UAS missions. An already established civilian contractor presence AU/ACSC/2016 5
48 CFR 1509.505-70 - Information sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Information sources. 1509... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.505-70 Information sources. (a) Disclosure. Prospective EPA Contractors responding to solicitations or submitting unsolicited...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR... materials or components, or commencement of production, is normally at the sole risk of the contractor. To... acquisition of materials and components, and for production after receipt of first article approval. When...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 9.103 Section 9.103 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.103 Policy. (a) Purchases shall be made from...
48 CFR 12.501 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Applicability. 12.501 Section 12.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... contractor is reselling or distributing commercial items of another contractor without adding value. This...
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506 Procedures. If the CO determines that contractor performance of the contemplated work is likely to create an organizational conflict of interest, then the contracting officer shall refer the documentation of the potential...
Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.
Freedom Star tows a barge with an SLWT into Port Canaveral for the first time
NASA Technical Reports Server (NTRS)
1998-01-01
Freedom Star, one of NASA's two solid rocket booster recovery ships, tows a barge containing the third Space Shuttle super lightweight external tank (SLWT) into Port Canaveral. This SLWT will be used to launch the orbiter Discovery on mission STS-95 in October. This first-time towing arrangement, part of a cost savings plan by NASA to prudently manage existing resources, began June 12 from the Michoud Assembly Facility in New Orleans where the Shuttle's external tanks are manufactured. The barge will now be transported up the Banana River to the LC-39 turn basin using a conventional tugboat. Previously, NASA relied on an outside contractor to provide external tank towing services at a cost of about $120,000 per trip. The new plan allows NASA's Space Flight Operations contractor, United Space Alliance (USA), to provide the same service directly to NASA using the recovery ships during their downtime between Shuttle launches. Studies show a potential savings of about $50,000 per trip. The cost of the necessary ship modifications should be paid back by the fourteenth tank delivery. The other recovery ship, Liberty Star, has also undergone deck strengthening enhancements and will soon have the necessary towing winch installed.
NASA Technical Reports Server (NTRS)
1998-01-01
Freedom Star, one of NASA's two solid rocket booster recovery ships, is towing a barge containing the third Space Shuttle Super Lightweight External Tank (SLWT) into Port Canaveral. This SLWT was slated for use to launch the orbiter Discovery on mission STS-95 in October 1998. This first time towing arrangement, part of a cost saving plan by NASA to prudently manage existing resources, began June 12 from the Michoud Assembly Facility in New Orleans where the Shuttle's external tanks were manufactured. The barge was transported up Banana River to the LC-39 turn basin using a conventional tug boat. Previously, NASA relied on an outside contractor to provide external tank towing services at a cost of about $120,000 per trip. The new plan allowed NASA's Space Flight Operations contractor, United Space Alliance (USA), to provide the same service to NASA using the recovery ships during their downtime between Shuttle launches. Studies showed a potential savings of about $50,000 per trip. The cost of the necessary ship modifications would be paid back by the fourteenth tank delivery. The other recovery ship, Liberty Star, also underwent deck strengthening enhancements and had the necessary towing wench installed.
Report on audit of Department of Energy`s contractor salary increase fund
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-04
The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less
48 CFR 970.0407 - Contractor records retention.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 9.505-4 - Obtaining access to proprietary information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest... use or (2) available to the Government or contractor from other sources without restriction. (b) A... source selection information by acquiring the services of marketing consultants which, if used in...
48 CFR 252.215-7002 - Cost estimating system requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...
48 CFR 252.215-7002 - Cost estimating system requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...
48 CFR 9.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Effect of listing. 9.405 Section 9.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 9.405 Effect of listing. (a) Contractors...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5 Contract clauses. (a) General contract clause. All contracts and simplified acquisitions of the types set forth in 2009.570-4(b) must include the clause entitled, “Contractor Organizational Conflicts of...
48 CFR 1852.234-2 - Earned Value Management System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...
48 CFR 1852.234-2 - Earned Value Management System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...
48 CFR 1852.234-2 - Earned Value Management System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burdick, A.
This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an integrated whole house performance contracting company and identify the most significant challenges facing a traditional HVAC contractor looking to transition to a whole house performance contractor. To facilitate the discussion, IBACOS divided the business operations profile of a typical integrated whole house performance contracting company (one that performs both HVAC and shell repair/upgrade work) into seven Operational Areas with more detailed Business Functions and Work Activities falling under each high-level Operational Area. The expert panel was asked to review the operational profile or 'map' of the Business Functions. The specific Work Activities within the Business Functions identified as potential transition barriers were rated by the group relative to the value in IBACOS creating guidance ensuring a successful transition and the relative difficulty in executing.« less
48 CFR 945.607-2 - Recovering precious metals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.607-2 Recovering precious metals. (b) Contractors generating contractor inventory containing precious metals shall... silver should be reported to the precious metals pool. The Oak Ridge Operations Office is responsible for...
48 CFR 970.0371-4 - Gratuities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-4 Gratuities. Employees of a management and operating contractor shall not, under... contractor is doing business, or proposing to do business, in accomplishing the work under the contract...
Motivation for a High Explosive Testing Program in South Africa
2015-12-04
following): Contractor Performance Evaluation Foreign Government Information Administrative or Operational Use Specific Authority ~ Proprietary lnformati...Software Document~tion Administrative or Operational Use B Foreign Governmen Information 0 D. Distribution authorized to the Department of Defense...and U.S. DoD Contractors only (check the following): 0 § Foreign Government Information Critical Technology Administrative or Operational Use B
48 CFR 252.215-7002 - Cost estimating system requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... for disagreeing. (3) The Contracting Officer will evaluate the Contractor's response and notify the...
48 CFR 1509.406-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 1509.406-3 Procedures. (a... who do not appear on the GSA Consolidated List; e.g., those who are ineligible based on a settlement...) Obtain the HCA's recommendation prior to reaching a voluntary exclusion settlement with a Contractor in...
26 CFR 31.3121(d)-1 - Who are employees.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., retailers, contractors, or operators of hotels, restaurants, or other similar establishments for merchandise..., retailers, contractors, or operators of hotels, restaurants, or other similar establishments for merchandise... solicits such orders from retail stores and restaurants. C is not within this occupational group. (4)(i...
Orbit transfer rocket engine technology program. Phase 2: Advanced engine study
NASA Technical Reports Server (NTRS)
Erickson, C.; Martinez, A.; Hines, B.
1987-01-01
In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.
NASA Technical Reports Server (NTRS)
Davis, Randal; Thalman, Nancy
1993-01-01
The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.
26 CFR 1.457-6 - Timing of distributions under eligible plans.
Code of Federal Regulations, 2010 CFR
2010-04-01
... under section 401(k) for additional guidance concerning severance from employment. (2) Independent contractors—(i) In general. An independent contractor is considered to have a severance from employment with... anticipates a renewal of a contractual relationship or the independent contractor becoming an employee. For...
Medicaid integrity program; limitation on contractor liability. Final rule.
2007-11-30
The Medicaid Integrity Program (the Program) provides that the Secretary promote the integrity of the Medicaid program by entering into contracts with contractors that will review the actions of individuals or entities furnishing items or services (whether fee-for-service, risk, or other basis) for which payment may be made under an approved State plan and/or any waiver of the plan approved under section 1115 of the Social Security Act; audit claims for payment of items or services furnished, or administrative services furnished, under a State plan; identify overpayments of individuals or entities receiving Federal funds; and educate providers of services, managed care entities, beneficiaries, and other individuals with respect to payment integrity and quality of care. This final rule will provide for limitations on a contractor's liability while performing these services under the Program. The final rule will, to the extent possible, employ the same or comparable standards and other substantive and procedural provisions as are contained in section 1157 (Limitation on Liability) of the Social Security Act.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salvato, S.J. Jr.; Flak, L.H.
Parts 1 and 2 of this series covered topics of strategy and planning, and logistics. In this article, the important subject of insurance -- what is available, what can be covered and why operators and contractors need to know this -- is discussed. Specific discussions include: (1) role of the adjuster and the mechanics of how you get paid, (2) two basic policy forms, OEE and EED 8/86, now available, and (3) evolution of well control coverage and important definitions. The article concludes with some comments and cautions on what might happen to this coverage in the future.
NASA Technical Reports Server (NTRS)
Good, Susan M.
2016-01-01
This Aqua Spring 2017 IAM Series powerpoint presentation will be presented at the MOWG meeting in Albuquerque, NM. Topics to be discussed are: recap Aqua 2016 IAM campaign maneuver results and post 2016 IAM MLT evolution; current DMU strategy; 2017 IAM campaign dates and planning; Aqua latest lifetime MLT team predictions. Susan Good is a contractor who supports David Tracewell in code 595 therefore this is being routed through 595. Eric Moyer, ESMO Deputy Project Manager-Technical has reviewed and approved this presentation.
Efforts to Prevent Sexual Assault/Harassment Involving DOD Contractors During Contingency Operations
2010-04-16
36 FAR Subpart 9.406-5, “ Debarment ,” October 1995, provides the Government with the option of imposing debarment or suspension as... sanctions against a contractor to protect the Government’s interest when the agent of the contractor, such as an employee, engages in fraudulent, criminal
48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...
48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...
4 CFR 83.19 - Government contractors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 4 Accounts 1 2011-01-01 2011-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...
4 CFR 83.19 - Government contractors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 4 Accounts 1 2013-01-01 2013-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...
4 CFR 83.19 - Government contractors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 4 Accounts 1 2012-01-01 2012-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...
4 CFR 83.19 - Government contractors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 4 Accounts 1 2014-01-01 2013-01-01 true Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...
Improvement of force health protection through preventive medicine oversight of contractor support.
Mower, Scott A
2009-01-01
Unprecedented numbers of contractors are used throughout the Iraq theater of operations to alleviate military manpower shortages. At virtually every major forward operating base, US-based contractors perform the preponderance of essential life support services. At more remote sites, local national contractors are increasingly relied upon to maintain chemical latrines, remove trash, deliver bulk water, and execute other janitorial functions. Vigorous oversight of contractor performance is essential to ensure services are delivered according to specified standards. Poor oversight can increase the risk of criminal activities, permit substandard performance, elevate disease and nonbattle injury rates, degrade morale, and diminish Soldier readiness. As the principal force health protection proponents in the Department of Defense, preventive medicine units must be tightly integrated into the oversight processes. This article defines the force health protection implications associated with service contracts and provide recommendations for strengthening preventive medicine's oversight role.
48 CFR 5152.208-9001 - Industrial preparedness planning.
Code of Federal Regulations, 2010 CFR
2010-10-01
... in paragraph (e) of this clause. As an LFPP for the listed items, the contractor will be solicited..., i.e. by assigning workload to a government-owned facility. (b) The Contractor agrees to: (i) Update... certifies that this capacity is not shared by any other mobilization production requirements. (e) This...
48 CFR 904.7004 - Findings, determination, and contract award or termination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... that award of a contract to an offeror(s) or continued performance of a contract by a contractor will... types of plans that a contractor can propose are: measures which provide for physical or organizational separation of the facility or organizational component containing the classified information or special...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575
DOE Office of Scientific and Technical Information (OSTI.GOV)
MOREN RJ; GRINDSTAFF KD
2012-01-11
The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currentlymore » planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between the contractors and DOE-RL. Information Management (IM) is a key part of the LTS program. The IM Program identifies, locates, stores, protects and makes accessible Hanford LTS records and data to support the transfer of property ultimately to LM. As such, DOE-RL manages the Hanford LTS Program in a manner consistent with LM's goals, policies, and procedures.« less
Navy Virginia (SSN 774) Class Attack Submarine Procurement: Background and Issues for Congress
2016-10-25
proposed plan include the following: GD/EB is to be the prime contractor for designing and building Ohio replacement boats; HII/NNS is to be a...boats, and HII/NNS would receive 22%-23%; GD/EB is to continue as prime contractor for the Virginia-class program, but to help balance out projected...execute this strategy, GDEB has been selected as the prime contractor for OR with the responsibilities to deliver the twelve OR [Ohio replacement
2017-04-01
from contractors . Until Block 3F testing is complete, DOD will not have the knowledge it needs to present a sound business case for Block 4. Second...January 2017 the details of this plan were unclear because DOD’s 2018 budget was not final and negotiations with the contractors were ongoing...management reports and historical test data; discussed key aspects of F-35 development with program management and contractor officials; and compared
Ground Systems Development Environment (GSDE) software configuration management
NASA Technical Reports Server (NTRS)
Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo
1992-01-01
This report presents a review of the software configuration management (CM) plans developed for the Space Station Training Facility (SSTF) and the Space Station Control Center. The scope of the CM assessed in this report is the Systems Integration and Testing Phase of the Ground Systems development life cycle. This is the period following coding and unit test and preceding delivery to operational use. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the SSTF and the SSCC, and the target systems for SSCC and SSTF. This is the last report in the series. The focus of this report is on the CM plans developed by the contractors for the Mission Systems Contract (MSC) and the Training Systems Contract (TSC). CM requirements are summarized and described in terms of operational software development. The software workflows proposed in the TSC and MSC plans are reviewed in this context, and evaluated against the CM requirements defined in earlier study reports. Recommendations are made to improve the effectiveness of CM while minimizing its impact on the developers.
Feasibility Analysis and Prototyping of a Fast Autonomous Recon system
2017-06-01
Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22
Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission
NASA Technical Reports Server (NTRS)
Garcia, Gonzalo; Barnoy, Assaf; Beech, Theresa; Saylor, Rick; Cosgrove, Jennifer Sager; Ritter, Sheila
2009-01-01
In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.
48 CFR 2828.307-1 - Group insurance plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 2828.307-1 - Group insurance plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 2828.307-1 - Group insurance plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Group insurance plans... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-19
... Management Information System (DAMIS) to allow the reporting of contractor data without duplication and will begin collecting annual drug and alcohol testing data for contractor employees with Management... regulated by 49 CFR Parts 192, 193, and 195. In a final rule titled ``Management Information System (MIS...
Alternative Fuels Data Center: Installing B20 Equipment
operations to share the fueling site with you. Secure Permits, Adhere to State Requirements The contractor is storage tanks. The contractor will register storage tanks with the state environmental agency, which must the contractor and client to ensure the completed project meets expectations. Maps & Data U.S
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rowsell, David Leon
This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.
Safety, reliability, maintainability and quality provisions for the Space Shuttle program
NASA Technical Reports Server (NTRS)
1990-01-01
This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.
48 CFR 52.237-3 - Continuity of Services.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the Government or another contractor, may continue them. The Contractor agrees to (1) furnish phase-in... phase-in, phase-out services for up to 90 days after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services...
48 CFR 52.237-3 - Continuity of Services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the Government or another contractor, may continue them. The Contractor agrees to (1) furnish phase-in... phase-in, phase-out services for up to 90 days after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services...
Contractor Logistics Support in the U.S. Air Force
2009-01-01
limits), or it can engage in a mix of the two approaches.2 This monograph addresses CLS, which is defined as contractor sustainment of a weapon system...organic facilities; it can pay contractors to do the work (subject to some congressional limits); or it can apply a mix of the two approaches.2 Organic...levels are largely stable and represent a mix of services, including contractor operated facilities and instal- Figure 3.1 Air Force CSS for Weapon
48 CFR 228.307-1 - Group insurance plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...
48 CFR 428.307-1 - Group insurance plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 428.307-1 - Group insurance plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 228.307-1 - Group insurance plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...
48 CFR 228.307-1 - Group insurance plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...
48 CFR 428.307-1 - Group insurance plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 228.307-1 - Group insurance plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...
48 CFR 428.307-1 - Group insurance plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 428.307-1 - Group insurance plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 2828.307-1 - Group insurance plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Group insurance plans. 2828... Contracting Requirements BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit the...
48 CFR 228.307-1 - Group insurance plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under cost...
49 CFR 199.115 - Contractor employees.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...
49 CFR 199.115 - Contractor employees.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...
49 CFR 199.115 - Contractor employees.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...
49 CFR 199.115 - Contractor employees.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...
Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.
Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S
2001-01-01
The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.
Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehman, L. L.; Nichols, W. E.
The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements themore » requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.« less
Nuclear reactors built, being built, or planned, 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simpson, B.
1992-07-01
This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1991. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor ismore » an American company -- working either independently or in cooperation with a foreign company (Part 4, in each section). Critical assembly refers to an assembly of fuel and assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less
Nuclear reactors built, being built, or planned 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-08-01
This publication contains unclassified information about facilities, built, being built, or planned in the United States for domestic use or export as of December 31, 1996. The Office of Scientific and Technical Information, U.S. Department of Energy, gathers this information annually from Washington headquarters, and field offices of DOE; from the U.S. Nuclear Regulatory Commission (NRC); from the U. S. reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from U.S. and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables ofmore » the characteristic and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled.« less
48 CFR 915.305 - Proposal evaluation.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...
48 CFR 915.305 - Proposal evaluation.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...
48 CFR 915.305 - Proposal evaluation.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...
48 CFR 915.305 - Proposal evaluation.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...
Radon gas: contractor liability for an indoor health hazard.
Shuko, C M
1986-01-01
Many families throughout the United States have recently detected dangerously high concentrations of radon gas inside their homes. Radon, a carcinogenic gas produced from uranium, has been discovered in structures overlying uranium-bearing rock. This discovery may result in litigation to determine contractor liability for building upon radon-releasing rock sites. This Note examines the strengths and weaknesses of the various theories of contractor liability and considers potential statutory claims under the Clean Air Act. The Note suggests, as an alternative approach to recovery, a proposed regulatory scheme and implementation plan.
Skylab checkout operations. [from multiple docking adapter contractor viewpoint
NASA Technical Reports Server (NTRS)
Timmons, K. P.
1973-01-01
The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
48 CFR 31.205-42 - Termination costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... rearrangement and alterations, management and personnel organization, and production planning. They do not... the contractor's plans and orders for current and planned production when determining if items can... nonrecurring labor, material, and related overhead costs incurred in the early part of production and result...
78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...
45 CFR 95.610 - Submission of advance planning documents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...
45 CFR 95.610 - Submission of advance planning documents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...
45 CFR 95.610 - Submission of advance planning documents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...
48 CFR 28.307-1 - Group insurance plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requirement. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the... other refunds to which the contractor may be entitled in the future shall be taken into account. ...
NASA Technical Reports Server (NTRS)
Perkins, Sharon; Martin, Andrea; Bavinger, Bill
1990-01-01
The Trajectory Operations Applications Software Task (TOAST) is a software development project whose purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle. The purpose of the evaluation was to evaluate TOAST as an Application Manager - to assess current and planned capabilities, compare capabilities to commercially-available off the shelf (COTS) software, and analyze requirements of MCC and Flight Analysis Design System (FADS) for TOAST implementation. As a major part of the data gathering for the evaluation, interviews were conducted with NASA and contractor personnel. Real-time and flight design users, orbit navigation users, the TOAST developers, and management were interviewed. Code reviews and demonstrations were also held. Each of these interviews was videotaped and transcribed as appropriate. Transcripts were edited and are presented chronologically.
Emergency preparedness and planning
NASA Technical Reports Server (NTRS)
Bouvier, Kenneth
1993-01-01
Monsanto's emergency response plan in dealing with hazardous materials at their facilities is presented. Topics discussed include the following: CPR training; emergency medial training; incident reports; contractor injuries; hazardous materials transport; evacuation; and other industrial safety concerns.
29 CFR 1952.107 - Changes to approved plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (b) The State submitted an industrial hygiene technical manual patterned after the Federal manual... under the plan to Superfund sites and private contractors working on U.S. Army Corps of Engineers dam...
Means of Effective Security Sector Reform: A Comparison of US Military and Contractor Programs
2011-05-19
the US Army took over 400 suspension / debarment actions in fiscal year 2010.65 GAO report 11-419T, Foreign Operations: Key Issues for Congressional...Contracting, Ensuring Contractor Accountability: Past Performance and Suspension & Debartment, Testimony, (Washington, D.C.: Commission on Wartime...64 Ibid., 8. 65 Commission on Wartime Contracting, Ensuring Contractor Accountability: Past Performance and Suspension
NASA Technical Reports Server (NTRS)
1986-01-01
With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Quality assurance criteria are described for manufacturers and installers of solar photovoltaic tests and applications. Quality oriented activities are outlined to be pursued by the contractor/subcontractor to assure the physical and operational quality of equipment produced is included. In the broad sense, guidelines are provided for establishing a QA organization if none exists. Mainly, criteria is provided to be considered in any PV quality assurance plan selected as appropriate by the responsible Field Center. A framework is established for a systematic approach to ensure that photovoltaic tests and applications are constructed in a timely and cost effective manner.
WIPP Remote-Handled TRU Waste Program Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Most, W.; Kehrman, B.
2006-07-01
There are two major regulatory approval milestones necessary in order to commence disposal operations for remote-handled transuranic (RH TRU) waste at the Waste Isolation Pilot Plant (WIPP)-the RH TRU hazardous waste permit modification request [1] and the radiological characterization plan [2]. One of those milestones has been achieved. The US Environmental Protection Agency (EPA) issued its final decision to approve the Department of Energy's (DOE) RH TRU radiological characterization plan along with the RH TRU Waste Characterization Program Implementation Plan [3], on March 26, 2004. The RH TRU hazardous waste permit modification request still awaits agency approval. In EPA's decisionmore » to approve the DOE's RH TRU radiological characterization plan, the EPA also set forth the process for approving site-specific RH TRU waste characterization programs. Included in the March 29, 2005, RH TRU second Notice of Deficiency [4] (NOD) on the Class 3 Permit Modification Request for RH TRU Waste, the New Mexico Environment Department (NMED) requested that the Permittees combine their responses for the RH TRU Waste NOD with the Section 311 permit modification request NOD. The Combined Response Document was submitted April 28, 2005 [5]. Another NOD [6] was issued by the NMED on September 1, 2005, to clarify the Permittees' proposal and submit these clarifications to the administrative record. Combining both the chap. 311 [7] and RH TRU waste permit modification requests allows for both the regulator and Permittees to expedite action on the modification requests. The Combined Response Document preserves human resources and costs by having only one administrative process for both modification requests. Facility readiness requirements of the RH TRU waste final permit [8] must be implemented to declare that the WIPP is ready to receive RH TRU waste for storage and disposal. To demonstrate readiness, the WIPP is preparing for an Operational Readiness Review (ORR) of the RH TRU waste management equipment, system, and procedures. Required by DOE Order, the ORR demonstrates the capability of managing RH TRU waste. The Management and Operating Contractor (MOC) for the WIPP must first perform a Line Management Assessment. Upon successful completion of the Line Management Assessment, the MOC performs the Contractor ORR and presents the results to the local DOE office. At that time, the local DOE office performs its own ORR to declare readiness to DOE Headquarters. (authors)« less
Prestigious Council to Advise National Renewable Energy Lab
laboratory by offering independent advice and counsel to the NREL operating contractor and NREL Director five years. The partnership officially became NREL's contractor today, following 21 years of management
Pooling knowledge and improving safety for contracted works at a large industrial park.
Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo
2015-01-01
At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.
Department of the Air Force Information Technology Program FY 95 President’s Budget
1994-03-01
2095 2200 552 900 1032 Description: Contractor hardware maintenan support, systems analyst support software development and maintenance, and off -the...hardware maintenance support, systems analyst support, operations support, configuration management, test support, and off -the-shelf software license...2419 2505 2594 Description: Contractor hardware maintenance support, systems analyst support, operations support, and off -the-shelf software license
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spalding, B.P.; Naney, M.T.
1995-06-01
This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less
NASA Technical Reports Server (NTRS)
1994-01-01
Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false [Reserved] 7.300 Section 7.300 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 7.300 [Reserved] ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
...EPA's Office of Transportation and Air Quality (OTAQ) plans to authorize various contractors to access information which will be submitted to EPA under Title II of the Clean Air Act that may be claimed as, or may be determined to be, confidential business information (CBI). Access to this information will begin on January 6, 2014.
Recovery Act Hospital Alteration Project at Naval Air Station Jacksonville
2010-12-07
QMAD Quantitative Methods and Analysis Division RLF Rogers Lovelock & Fritz, Incorporated SE Southeast SF Square Feet SOW Statement of Work TMA TRICARE...Finally, the contractor, Rogers Lovelock & Fritz, Incorporated, reported the recipient information required by the Recovery Act. What We Recommend...contractor, Rogers Lovelock & Fritz, Incorporated (RLF), reported the recipient information required by the Recovery Act. Planning: Initially, Project
Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lum, Clinton C. L.
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less
40 CFR 52.2352 - Change to approved plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) rule R307-1-8, Asbestos Work Practices, Contractor Certification, AHERA Accreditation and AHERA Implementation, is removed from Utah's approved State Implementation Plan (SIP). This rule language pertains to... plan. (a) Utah Air Conservation Regulation R307-18-1, New Source Performance Standards, is removed from...
Code of Federal Regulations, 2010 CFR
2010-10-01
... terms and conditions of their contracts, during periods of crisis. As a general rule, the designation of... services shall have a written plan to ensure the continuation of these services in crisis situations...-provided written plan. Contractors will activate such plans only during periods of crisis, as directed by...
Staffing for Cyberspace Operations: Summary of Analysis
2016-08-01
appropriate total force mix, defined as the choice between military, civilian, and contractor performance of DoD activities, is a key component in this...designated for civilian performance if the requirement is inherently governmental or subject to least-cost government civilian or contractor performance if...activities open to the least costly performance type (government civilian or contractor ). To understand the CMF mission requirements, we studied existing
Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.
1994-08-01
This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65.more » The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.« less
Proceedings of the Department of Energy ALARA Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dionne, B.J.; Baum, J.W.
1992-01-01
The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately.« less
Environmental liability and life-cycle management of used lubricating oils.
Guerin, Turlough F
2008-12-30
Used oil handling, as a business, requires an extensive understanding by management that environmental liabilities exist through its supply chain. Findings from a review of the legal requirements of operating a used oil handling business were: understanding the transfer of ownership of used petroleum hydrocarbons is critical to any such business and how this is documented; used oil handlers are responsible for providing training to their staff, including site personnel and any third party waste contractors, and for communicating best practice procedures relating to the management of used petroleum hydrocarbons to all those individuals and organisations involved in business relationships that the used oil handling companies have; used oil handlers should audit the performance of any third party contractors that it engages to conduct work on behalf of its customers. Hypothetical situations of a company planning to enter the used oil handling market are described in relation to petroleum hydrocarbon wastes it handles to illustrate the range of potential liabilities. Companies proposing to establish a used oil handling business should ensure that they provide accurate advice to its employees, its customer's employees and to its third party contractors, all of which may be responsible for handling used petroleum hydrocarbons as part of the service it intends to provide, and that it has a well documented system addressing how environmental issues are managed.
48 CFR 307.7108 - Statement of work.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Statement of work. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW describes the work or services a contractor is to perform in reaching an end result without describing the...
10 CFR 719.10 - What information must be included in the legal management plan?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...
10 CFR 719.15 - What are the requirements for a staffing and resource plan?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false What are the requirements for a staffing and resource plan... Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require retained legal counsel providing legal services to prepare a staffing...
10 CFR 719.15 - What are the requirements for a staffing and resource plan?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false What are the requirements for a staffing and resource plan... Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require retained legal counsel providing legal services to prepare a staffing...
10 CFR 719.12 - What information must be included in the Legal Management Plan?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false What information must be included in the Legal Management Plan? 719.12 Section 719.12 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan, Staffing and Resource Plan and Annual Legal Budget § 719.12 What information must be...
10 CFR 719.10 - What information must be included in the legal management plan?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...
10 CFR 719.10 - What information must be included in the legal management plan?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...
Freedom Star tows a barge with an SLWT into Port Canaveral for the first time
NASA Technical Reports Server (NTRS)
1998-01-01
Freedom Star, one of NASA's two solid rocket booster recovery ships, tows a barge containing the third Space Shuttle super lightweight external tank (SLWT) into Port Canaveral. This SLWT will be used to launch the orbiter Discovery on mission STS-95 in October. This first-time towing arrangement, part of a cost savings plan by NASA to prudently manage existing resources, began June 12 from the Michoud Assembly Facility in New Orleans where the Shuttle's external tanks are manufactured. The barge will now be transported up the Banana River to the LC-39 turn basin using a conventional tugboat. Previously, NASA relied on an outside contractor to provide external tank towing services at a cost of about $120,000 per trip. The new plan allows NASA's Space Flight Operations contractor, United Space Alliance (USA), to provide the same service directly to NASA using the recovery ships during their downtime between Shuttle launches. Studies show a potential savings of about $50,000 per trip. The cost of the necessary ship modifications should be paid back by the fourteenth tank delivery. The other recovery ship, Liberty Star, has also undergone deck strengthening enhancements and will soon have the necessary towing winch installed. The other recovery vessel, Liberty Star, has undergone deck strengthening enhancements along with Freedom Star and will soon have the necessary towing winch installed.
The NPOESS Community Collaborative Calibration/Validation Program for the NPOESS Preparatory Project
NASA Astrophysics Data System (ADS)
Kilcoyne, H.; Feeley, J.; Guenther, B.; Hoffman, C. W.; Reed, B.; St. Germain, K.; Zhou, L.; Plonski, M.; Hauss, B.
2009-12-01
The National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) Calibration and Validation (Cal/Val) team is currently executing pre-launch activities and planning post-launch activities to efficiently integrate the NPOESS Sensor Data Records (SDRs) and Environmental Data Records (EDRs) into Customer applications to reduce risk in achieving NPOESS Mission Success. The NPP Cal/Val Team, led by the Integrated Program Office (IPO), includes members from the Contractor team producing the data products and subject matter experts from the Customer and User communities, bringing together the expertise with the production algorithms, product use, and science community. This presentation will highlight the progress made in the past year in defining the post-launch activity schedule, involvement of the science and operational data users, and techniques and correlative data used.
NASA Technical Reports Server (NTRS)
1989-01-01
The report is a summary of the 5th NASA/Contractors Conference on Quality and Productivity. The theme was 'Quality - A Commitment to the Future'. The summary report highlights the key points: commitment to quality, strategic and long-range planning, quality commitment, risk management, teaming, quality measurement, creating a quality environment, contract incentives, software quality and reliability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...
Quality program plan for the Ultraviolet Spectrometer Experiment S169, Revision C
NASA Technical Reports Server (NTRS)
Vinson, W. W.
1971-01-01
The quality progress plan establishes the requirements for a system of controls to assure compliance with the quality assurance requirements as set forth in NASA quality program provisions for aeronautical and space system contractors.
KSC off-runway contingency operation - Mode 7
NASA Technical Reports Server (NTRS)
Maples, Arthur; Doerr, Donald
1991-01-01
The possibility of a mishap during a space shuttle landing at Kennedy Space Center (KSC) dictates the need for plans to rescue astronauts from areas other than the Shuttle Landing Facility (SLF). All shuttle landings are unpowered, gliding flight maneuvers, and a deviation from the planned flight profile could result in a shuttle landing or crashing somewhere other than the SLF runway. The geography of the Kennedy Space Center makes helicopter airlifting the only universal means of transportation for the rescue crew. This rescue crew is composed of KSC contractor fire-rescuemen who would ride to the crash scene on USAF HH-3 helicopters. These crews are provided with personal protective suits and training in shallow water, swamp, and dry land rescues. They aid the egress of the crew to a safe area for helicopter pickup and subsequent triage and medevac.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honeyman, J.O.
1998-01-09
This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
Environmental scanning for Social Services.
Russell, S; Prince, M J
1992-10-01
This article describes the development of a process of systematic regional environmental scanning as part of strategic planning in the Ministry of Social Services (MSS) in British Columbia, over the 1987-1990 period. Social Services, a large regionalized social service organization, adopted a formal strategic planning process in early 1988. Ministry services are delivered in ten regions with widely varying characteristics. To ensure that this diversity is reflected in the planning process, it is essential that regional environmental information receive consideration. A simple format was developed and regional directors asked to consult with their staff and to scan their regions for issues that may impact the ministry over the medium term. The information obtained was presented by regional directors at a Senior Management Committee meeting and included in the ministry's annual Business Plan, a document which informs staff, contractors, stakeholders, and the community at large of the ministry's values, objectives, and operational goals. The inclusion of regional analyses adds useful information to the Plan. A second output of the planning process is the ministry budget. The systematic regional scans were found to be extremely useful to regional staff, other directors, and to the ministry executives while setting priorities.
48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...
48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...
Code of Federal Regulations, 2010 CFR
2010-04-01
... LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Administrative and Management..., including a screening and admissions contractor; (2) Changing the management staff of a center; (3) Changing...
48 CFR 939.7002 - Contractor acquisition of information technology.
Code of Federal Regulations, 2013 CFR
2013-10-01
... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...
48 CFR 939.7002 - Contractor acquisition of information technology.
Code of Federal Regulations, 2014 CFR
2014-10-01
... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...
48 CFR 939.7002 - Contractor acquisition of information technology.
Code of Federal Regulations, 2011 CFR
2011-10-01
... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...
48 CFR 939.7002 - Contractor acquisition of information technology.
Code of Federal Regulations, 2012 CFR
2012-10-01
... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...
23 CFR 635.116 - Subcontracting and contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...
48 CFR 939.7002 - Contractor acquisition of information technology.
Code of Federal Regulations, 2010 CFR
2010-10-01
... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...
2016-10-14
not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians
Debarment and suspension. [of contractors
NASA Technical Reports Server (NTRS)
Whelan, Thomas J.
1987-01-01
The changing Government attitude toward contractor debarment and suspension is examined, with emphasis on the fact that the Government is more alert to fraud, waste, and abuse. Consideration is given to causes of debarment or suspension, procedures and due process hearings, settlement agreements, compliance programs, and recent related legislation. It is concluded that the change in the Government contracting environment in recent years should be sufficient incentive for contractors to monitor their operations more closely.
10 CFR 719.10 - What information must be included in the legal management plan?
Code of Federal Regulations, 2011 CFR
2011-01-01
... be ensured; and, (6) The contractor's corporate approach to legal decision making. ... 10 Energy 4 2011-01-01 2011-01-01 false What information must be included in the legal management... Management Plan § 719.10 What information must be included in the legal management plan? The legal management...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
48 CFR 2907.300 - Availability of inventory.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Availability of inventory... PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 2907.300 Availability of inventory. The Department of Labor's FAIR Act inventory of commercial activities performed by federal employees...
European X-ray observatory satellite (Exosat)
NASA Technical Reports Server (NTRS)
1983-01-01
Initially planned to be launched on the Ariane L6, the 510 kilogram European X-Ray Observatory Satellite (EXOSAT) is to be placed into orbit from Space Launch Complex 2 West by NASA's Delta 3914 launch vehicle. Objectives of the mission are to study the precise position, structure, and temporal and spectral characteristics of known X-ray sources as well as search for new sources. The spacecraft is described as well as its payload, principal subsystems, and the stages of the Delta 3914. The flight sequence of events, land launch operations are discussed. The ESA management structure for EXOSAT, the NASA/industry team, and contractors are listed.
The role of NASA for aerospace information
NASA Technical Reports Server (NTRS)
Chandler, G. P., Jr.
1980-01-01
The NASA Scientific and Technical Information Program operations are performed by two contractor operated facilities. The NASA STI Facility, located near Baltimore, Maryland, employs about 210 people who process report literature, operate the computer complex, and provide support for software maintenance and developments. A second contractor, the Technical Information Services of the American Institute of Aeronautics and Astronautics, employs approximately 80 people in New York City and processes the open literature such as journals, magazines, and books. Features of these programs include online access via RECON, announcement services, and international document exchange.
The application of automated operations at the Institutional Processing Center
NASA Technical Reports Server (NTRS)
Barr, Thomas H.
1993-01-01
The JPL Institutional and Mission Computing Division, Communications, Computing and Network Services Section, with its mission contractor, OAO Corporation, have for some time been applying automation to the operation of JPL's Information Processing Center (IPC). Automation does not come in one easy to use package. Automation for a data processing center is made up of many different software and hardware products supported by trained personnel. The IPC automation effort formally began with console automation, and has since spiraled out to include production scheduling, data entry, report distribution, online reporting, failure reporting and resolution, documentation, library storage, and operator and user education, while requiring the interaction of multi-vendor and locally developed software. To begin the process, automation goals are determined. Then a team including operations personnel is formed to research and evaluate available options. By acquiring knowledge of current products and those in development, taking an active role in industry organizations, and learning of other data center's experiences, a forecast can be developed as to what direction technology is moving. With IPC management's approval, an implementation plan is developed and resources identified to test or implement new systems. As an example, IPC's new automated data entry system was researched by Data Entry, Production Control, and Advance Planning personnel. A proposal was then submitted to management for review. A determination to implement the new system was made and elements/personnel involved with the initial planning performed the implementation. The final steps of the implementation were educating data entry personnel in the areas effected and procedural changes necessary to the successful operation of the new system.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-21
...EPA's Office of Transportation and Air Quality (OTAQ) plans to authorize various contractors to access information which was submitted to EPA under Title II of the Clean Air Act that may be claimed as, or may be determined to be, confidential business information (CBI). Access to this information, which is related to the Nonroad Diesel Engine Program will begin on February 22, 2013.
Analysis of Private Sector Care Reform Authorities and Savings
2016-12-01
contractors/carriers offering competing health plans in a given market area. This attribute is key to ensuring the carriers focus on the preferences of...contractor to compete and evolve its suite of tools as the market changes and conditions vary across markets . Many federal (civilian) healthcare...PSC would target the contracting mechanisms DoD uses to purchase PSC and the incentives within healthcare markets that these contracting mechanisms
48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).
Code of Federal Regulations, 2011 CFR
2011-10-01
... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...
Effective Teamwork: The EVA NBL Experience
NASA Technical Reports Server (NTRS)
Crocker, Lori
2007-01-01
This viewgraph presentation reviews the experience of improving the operation of the ExtraVehiclar Activity (EVA) Neutral Buoyancy Laboratory as a team of NASA employees and contractors. It reviews specific recommendations to use in turning a struggling organization around as a NASA/contractor team
48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).
Code of Federal Regulations, 2013 CFR
2013-10-01
... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...
48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).
Code of Federal Regulations, 2014 CFR
2014-10-01
... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...
48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).
Code of Federal Regulations, 2012 CFR
2012-10-01
... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...
Proceedings of the Department of Energy ALARA Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dionne, B.J.; Baum, J.W.
1992-12-31
The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE`s field office and contractor personnel about the Office of Health`s programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors` facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters` ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors` ALARA programs. Individual papers are indexed separately.« less
48 CFR 807.300 - Scope of subpart.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Scope of subpart. 807.300 Section 807.300 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 807.300 Scope of subpart...
48 CFR 807.300 - Scope of subpart.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope of subpart. 807.300 Section 807.300 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 807.300 Scope of subpart...
48 CFR 970.0371-7 - Outside employment of contractor employees.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Outside employment of contractor employees. 970.0371-7 Section 970.0371-7 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...
TRICARE Managed Care Support Contractor Program Integrity Units Met Contract Requirements
2012-12-05
these contractors because they represented 52 percent of purchased care claims paid in 20 ll for TRICARE beneficiaries. We did not review the dental ...5 (!ru-L..!J(It~ t’J Alice F. Carey Assistant Inspector General Readiness, Operations, and Support
RADON REDUCTION TECHNIQUES FOR DETACHED HOUSES, TECHNICAL GUIDANCE (SECOND EDITION)
This document is intended for use by State officials, radon mitigation contractors, building contractors, concerned homeowners, and other persons as an aid in the selection, design, and operation of radon reduction measurements for houses. It is the second edition of EPA's techn...
Contractors on Deployed Military Operations: United Kingdom Policy and Doctrine
2005-09-01
contractor’s workforce than military personnel, and contractors cannot be disciplined for violations of the Uniform Code of Military Justice.101 Moreover...objectives are met.151 The MoD’s “Defence Agencies” currently employ 60 percent of MoD’s civilian workforce and 11 percent of total uniformed personnel...operations by staff drawn from the contractor’s workforce who are reservist members of the Armed Forces.”177 With these initiatives, MoD assumes it has
Monitoring of the Quality of the Defense Contract Audit Agency FY 2010 Audits
2013-03-07
performed by regional audit managers include reviewing high risk assignments and reports prior to their issuance, performing post-issuance reviews, or...brainstorming procedure requires the audit team ( managers , supervisors, and auditors) to discuss the risk of fraud for that engagement and to discuss the risk ...auditors to make inquiries of contractor management of management’s knowledge of fraud risks during its annual planning meeting with major contractors
NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations
NASA Technical Reports Server (NTRS)
Letchworth, Gary; Schlierf, Roland
2011-01-01
The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.
NASA Astrophysics Data System (ADS)
Feeley, J.; Zajic, J.; Metcalf, A.; Baucom, T.
2009-12-01
The National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) Calibration and Validation (Cal/Val) team is planning post-launch activities to calibrate the NPP sensors and validate Sensor Data Records (SDRs). The IPO has developed a web-based data collection and visualization tool in order to effectively collect, coordinate, and manage the calibration and validation tasks for the OMPS, ATMS, CrIS, and VIIRS instruments. This tool is accessible to the multi-institutional Cal/Val teams consisting of the Prime Contractor and Government Cal/Val leads along with the NASA NPP Mission team, and is used for mission planning and identification/resolution of conflicts between sensor activities. Visualization techniques aid in displaying task dependencies, including prerequisites and exit criteria, allowing for the identification of a critical path. This presentation will highlight how the information is collected, displayed, and used to coordinate the diverse instrument calibration/validation teams.
Managing the Private Spies: Use of Commercial Augmentation for Intelligence Operations
2006-06-01
even has a Field Manual devoted to contractor administration which brings out many of the same points (FM 3-100.26, “Contractors on the Battlefi eld...Printing Offi ce), 2001, 53. 38 Mahlon Apgar and John Keane, “New Business with the New Military,” Harvard Business Review, (September 2004), 45. 12 are... manual for Contractors on the Battlefi eld acknowledges that “there is no specifi cally identifi ed force structure nor detailed policy on how to
2010-06-22
Congress has generally accepted the concept of using unarmed contractors to carry out support functions in military operations, such as providing food and...countries where stability generally is not an issue. 3 According to one report, “Not since the 17th century has there been such a reliance on private...Institution has estimated that citizens of some 30 countries have worked as security contractors in Iraq.6 PSC employees are generally divided by
2016-06-01
Allan Robichaux, DPW PWD GTMO and the management and staff of the GTMO on site contractor , Centerra. Page Intentionally Left Blank ii Table of...operations and maintenance contractor to ensure that data transfers are completed as required. Figure 4 shows the location of the ORC installation on MUSE...this issue with telephone support from CRM’s controls contractor (Winn-Marion, W-M); however, the problem remained unresolved as of Sept. 1 when
2016-01-01
abuse. 62 The success of U.S. foreign policy in complex and high threat environments is dependent upon private contingency contractors for a number...Trafficking: Oversight of Contractors ’ Use of Foreign Workers in High -Risk Environments Needs to Be Strengthened,” November 2014, http://www.gao.gov...Congressional Committees, “GAO-15- 102 Human Trafficking: Oversight of Contractors ’ Use of Foreign Workers in High -Risk Environments Needs to Be
48 CFR 1509.502 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.502 Applicability. This... applies to contracts with the Small Business Administration (SBA) under the 8(a) program. ...
Environmental monitoring handbook for coal conversion facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salk, M.S.; DeCicco, S.G.
1978-05-01
The primary objectives of the Department of Energy's (DOE) coal conversion program are to demonstrate the environmental acceptability, technical feasibility, and economic viability of various technologies for gaseous, liquid, and solid fuels from coal. The Environmental Monitoring Handbook for Coal Conversion Facilities will help accomplish the objective of environmental acceptability by guiding the planning and execution of socioeconomic and environmental monitoring programs for demonstration facilities. These programs will provide information adequate to (1) predict, insofar as is possible, the potential impacts of construction and operation of a coal conversion plant, (2) verify the occurrence of these or any other impactsmore » during construction and operation, (3) determine the adequacy of mitigating measures to protect the environment, (4) develop effluent source terms for process discharges, and (5) determine the effectiveness of pollution control equipment. Although useful in a variety of areas, the handbook is intended primarily for contractors who, as industrial partners with DOE, are building coal conversion plants. For the contractor it is a practical guide on (1) the methodology for developing site- and process-specific environmental monitoring programs, (2) state-of-the-art sampling and analytical techniques, and (3) impact analyses.To correspond to the phases of project activity, the subject matter is divided into four stages of monitoring: (1) a reconnaissance or synoptic survey, (2) preconstruction or baseline, (3) construction, and (4) operation, including process monitoring (prepared by Radian Corp., McLean, Va.). For each stage of monitoring, guidelines are given on socioeconomics, aquatic and terrestrial ecology, air quality and meteorology, surface and groundwater quality, geohydrology and soil survey, and surface water hydrology.« less
75 FR 76345 - Risk Reduction Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Management Plan Each RRPP must include a Fatigue Management Plan (FMP) that will be designed to reduce the... organizations to develop voluntary proactive safety programs designed to improve railroad safety and build... contractors. A railroad's RRPP may be required to specify how the railroad will periodically review the design...
Benefit Analysis of SPC Panel SP-10 Projects
1995-12-01
started by stating the definition of Flexible Automation as: “The combination of reprogrammable single and multi- functional manipulators and fixed...shipyards (like the automobile industry) for them to put a plan together, hence the need for a consultant or contractor. To-assist the developing a plan
30 CFR 46.12 - Responsibility for independent contractor training.
Code of Federal Regulations, 2012 CFR
2012-07-01
... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...
30 CFR 46.12 - Responsibility for independent contractor training.
Code of Federal Regulations, 2013 CFR
2013-07-01
... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...
30 CFR 46.12 - Responsibility for independent contractor training.
Code of Federal Regulations, 2011 CFR
2011-07-01
... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...
30 CFR 46.12 - Responsibility for independent contractor training.
Code of Federal Regulations, 2014 CFR
2014-07-01
... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...
48 CFR 945.607-2 - Recovering precious metals.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Recovering precious metals. (b) Contractors generating contractor inventory containing precious metals shall... silver should be reported to the precious metals pool. The Oak Ridge Operations Office is responsible for... Martin Marietta Energy Systems, M.S. 8207, P.O. Box 2009, Oak Ridge, TN 37831. [54 FR 27648, June 30...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-27
... PHMSA-2013-0248] Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline... Management Information System (MIS) Data; and New Method for Operators to Obtain User Name and Password for...
23 CFR 635.110 - Licensing and qualification of contractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...
25 CFR 226.24 - Lessee's use of water.
Code of Federal Regulations, 2011 CFR
2011-04-01
... LANDS FOR OIL AND GAS MINING Operations § 226.24 Lessee's use of water. Lessee or his contractor may... water is taken. Similarly, Lessee or his contractor may use water from reservoirs formed by the... quantity to which they originally would have been entitled had the reservoirs not been constructed. Lessee...
25 CFR 226.24 - Lessee's use of water.
Code of Federal Regulations, 2010 CFR
2010-04-01
... LANDS FOR OIL AND GAS MINING Operations § 226.24 Lessee's use of water. Lessee or his contractor may... water is taken. Similarly, Lessee or his contractor may use water from reservoirs formed by the... quantity to which they originally would have been entitled had the reservoirs not been constructed. Lessee...
48 CFR 970.4402-3 - Purchasing from contractor-affiliated sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the entities are separately incorporated. (b) Subcontracts for performance of contract work itself (as distinguished from the purchase of supplies and services needed in connection with the performance of work... and operating contractor seeks authorization to have some part of the contract work performed by a...
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
JENSEN, C.E.
2000-01-10
This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.
Hanford Internal Dosimetry Program Manual, PNL-MA-552
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.
2009-09-24
This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Certa, P.J.
1998-01-07
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
32 CFR 159.2 - Applicability and scope.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CONTRACTORS OPERATING IN CONTINGENCY OPERATIONS § 159.2 Applicability and scope. This part: (a) Applies to: (1... PSCs and PSC personnel performing private security functions during contingency operations outside the...
Disaster Response and Planning for Libraries.
ERIC Educational Resources Information Center
Kahn, Miriam B.
Providing a customized disaster response plan to assist libraries in quick recovery, this resource also outlines step to minimize damage and protect materials before trouble strikes. The first section of the book, "Response," contains information how to handle small jobs in-house and suggestions for working with contractors--with an…
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2012 CFR
2012-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
48 CFR 1605.000 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS 1605.000.... Eligible contractors (i.e., qualified health benefits carriers) are identified in accordance with 5 U.S.C...
48 CFR 970.5226-1 - Diversity plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-06
... Drug and Alcohol Management Information System (DAMIS) to operators, but will make the user name and... DAMIS Sign-In Information AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... testing information must be submitted for contractors performing or ready to perform covered functions...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...
2012-06-27
8866 (DSN 664-8866). Alice F. Carey Assistant Inspector General Readiness, Operations, and Support DISTRIBUTION: UNDER SECRETARY...medical or dental care is not authorized, and contractor personnel may not receive these services at MTFs unless specifically authorized under the
Code of Federal Regulations, 2010 CFR
2010-04-01
... tribe or tribal organization holds title eligible for facilities operation and maintenance funding from... INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF... Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...
Code of Federal Regulations, 2011 CFR
2011-04-01
... tribe or tribal organization holds title eligible for facilities operation and maintenance funding from... INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF... Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...
Code of Federal Regulations, 2012 CFR
2012-04-01
... tribe or tribal organization holds title eligible for facilities operation and maintenance funding from... INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF... Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...
Powder River lures contractors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stremel, K.
1984-10-01
Drilling successes are stimulating a high level of geophysical activity in the Powder River Basin. Focused in areas of concentrated exploration, a majority of speculative surveys are specifically designed to delineate target formations. Several contractors credit available data with an increased amount of current and proposed exploration. Geophysical surveying operations in the northern Rockies are discussed.
25 CFR 273.54 - Privacy Act requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...
25 CFR 273.54 - Privacy Act requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...
25 CFR 273.54 - Privacy Act requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...
25 CFR 273.54 - Privacy Act requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...
25 CFR 273.54 - Privacy Act requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... asserted that quantitative and measurable analyses similar to those for minorities and women were needed to... provided few details about the design or operation of the California State program, and that, consequently... recommended that the contractor be required to invite voluntary self- identification at both the pre- and post...
Hired Guns: Views about Armed Contractors in Operation Iraqi Freedom
2010-01-01
Survey Instrument Development , Sampling Procedures, and Other Data Sources . . . . . . . . . 4 Roadmap of the Monograph...Defense and State, and the U.S. Agency for International Development (USAID). However, jour- nalists, reconstruction contractors, nongovernmental...Agency for International Development (USAID). • Published literature. Our sources included government reports, memos, news- paper accounts, and
Alternative trailer configurations for maximizing payloads
Jason D. Thompson; Dana Mitchell; John Klepac
2017-01-01
In order for harvesting contractors to stay ahead of increasing costs, it is imperative that they employ all options to maximize productivity and efficiency. Transportation can account for half the cost to deliver wood to a mill. Contractors seek to maximize truck payload to increase productivity. The Forest Operations Research Unit, Southern Research Station, USDA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-16
... Mobile Fueling Operations, Nationwide AGENCY: Postal Service. ACTION: Notice of intent to prepare a...) for the use of mobile fueling contractors to fuel postal vehicles on-site at selected Postal Service... utilize mobile fueling contractors to fuel vehicles on site at selected postal facilities located...
Blackley, David J.; Retzer, Kyla D.; Hubler, Warren G.; Hill, Ryan D.; Laney, A. Scott
2015-01-01
Background Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. Methods We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003–2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Results Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. Conclusions For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. PMID:25164118
Blackley, David J; Retzer, Kyla D; Hubler, Warren G; Hill, Ryan D; Laney, A Scott
2014-10-01
Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003-2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. © 2014 Wiley Periodicals, Inc.
1987-01-01
Headquarters Services Directorate for Information Operations and Reports D) ,( /NT IS lientitra on nn Iber for hIs bh act& r, s (i0 ’F H 7 FOREWORD 500...This report provides information on the 500 contractors that received the largest dollar volume in Department of Defense (DOD) prime contract awards... report presents summary data on the 500 prime contractors receiving the largest dollar volume in Department of Defense (DOD) awards over $25,000 for
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining Requirements Documents 211.273... representatives of the contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and...
OSH technical reference manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasbrouck, J.C.; MacLean, H.D.; Geotech, R.
1996-11-01
Rust Geotech, operating contractor at the U.S. Department of Energy Grand Junction Projects Office (DOE-GJPO), conducted a demonstration of the trench boundary and large-object location capabilities of five nonintrusive geophysical methods in the Low-Level Radioactive Waste Disposal Facility (LLRWDF) at the DOE Savannah River Site (SRS). The plan for Resource Conservation and Recovery Act (RCRA) closure of the SRS LLRWDF specifies inplace compaction of {open_quotes}B-25{close_quotes} metal boxes containing low-level radioactive wastes. The boxes are buried in Engineered Low-Level Trenches (ELLTs) at the facility. To properly guide and control the compaction operation, the coordinates of the trench boundaries must be determinedmore » to an accuracy within 5 feet and the outer edges of the metal boxes in the trenches must be determined to within 2 feet.« less
Recce NG: from Recce sensor to image intelligence (IMINT)
NASA Astrophysics Data System (ADS)
Larroque, Serge
2001-12-01
Recce NG (Reconnaissance New Generation) is presented as a complete and optimized Tactical Reconnaissance System. Based on a new generation Pod integrating high resolution Dual Band sensors, the system has been designed with the operational lessons learnt from the last Peace Keeping Operations in Bosnia and Kosovo. The technical solutions retained as component modules of a full IMINT acquisition system, take benefit of the state of art in the following key technologies: Advanced Mission Planning System for long range stand-off Manned Recce, Aircraft and/or Pod tasking, operating sophisticated back-up software tools, high resolution 3D geo data and improved/combat proven MMI to reduce planning delays, Mature Dual Band sensors technology to achieve the Day and Night Recce Mission, including advanced automatic operational functions, as azimuth and roll tracking capabilities, low risk in Pod integration and in carrier avionics, controls and displays upgrades, to save time in operational turn over and maintenance, High rate Imagery Down Link, for Real Time or Near Real Time transmission, fully compatible with STANAG 7085 requirements, Advanced IMINT Exploitation Ground Segment, combat proven, NATO interoperable (STANAG 7023), integrating high value software tools for accurate location, improved radiometric image processing and open link to the C4ISR systems. The choice of an industrial Prime contractor mastering across the full system, all the prior listed key products and technologies, is mandatory to a successful delivery in terms of low Cost, Risk and Time Schedule.
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 209.570-1 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts... clause at 252.209-7007, Prohibited Financial Interests for Lead System Integrators. See PGI 209.570-1 for...
SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Timothy A.; Blair, Michael W.; Weis, Eric
2014-03-03
The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less
Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... Nonattainment and Maintenance Areas and Utah and Weber Counties: Gasoline Transfer and Storage;'' R307-335...: Qualification of Contractors and Test Procedures for Vapor Recovery Systems for Gasoline Delivery Tanks.'' This... Counties: Gasoline Transfer and Storage; Rule R307-335, Ozone Nonattainment and [[Page 59249
How to renovate a 50-year-old wastewater treating plant: Part 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunter, M.L.
1996-01-01
How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of... performance to be in the best interest of the Federal government. (b) The HCA is designated as the official to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1309.407-1 General... forth in CAM 1301.70 states in writing compelling reasons for continuing to do business with a suspended...
48 CFR 370.701 - Contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...
48 CFR 370.701 - Contract clause.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...
48 CFR 370.701 - Contract clause.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...
48 CFR 370.701 - Contract clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with the implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS...
48 CFR 970.0371-9 - Contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal....5203-3, Contractor's Organization, in all management and operating contracts. The approval authority of...
Code of Federal Regulations, 2014 CFR
2014-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
Code of Federal Regulations, 2012 CFR
2012-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
Code of Federal Regulations, 2013 CFR
2013-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
A Landowner's Guide to Building Forest Access Roads
Richard L. Wiest
1998-01-01
This guide is designed for landowners in the northeastern United States who will use a tractor and ordinary earth moving equipment to build the simplest access roads on their property, or who will contract for these services. Logging roads on small woodland properties are usually constructed by the logging contractor, sawmill operator, or by a road contractor.
ERIC Educational Resources Information Center
Figlio, Mary Ellen
1979-01-01
Asbestos in the schools has become a serious problem. Current activity in inspecting for asbestos and plans for corrective action are discussed. Suggestions are offered administrators in choosing contractors for asbestos removal. (MLF)
48 CFR 3452.208-72 - Paperwork Reduction Act.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... If the contractor will collect information requiring answers to identical questions from 10 or more people, no plan, questionnaire, interview guide, or other similar device for collecting information may...
48 CFR 3452.227-71 - Paperwork Reduction Act.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Government. If the contractor will collect information requiring answers to identical questions from 10 or more people then no plan, questionnaire, interview guide, or other similar device for collecting...
NASA Technical Reports Server (NTRS)
Workman, Gary L
1992-01-01
Recent issues emerging in our fiscal and ecological environments have promulgated that federal agencies shall promote activities which respond to the improvement of both. In response to these developments, the National Aeronautics and Space Administration (NASA) has undertaken an innovative approach to improve the control of materials used in all NASA manufacturing activities. In concert with this goal, NASA is requiring that its contractors and their sub-contractors perform a more intensive consolidation of technologies that can provide an accounting of materials, which includes in-coming materials, materials in process, end-products and waste materials. The purpose of this handbook is to provide guidelines to NASA and its contractor personnel for the planning and implementation of chemical fingerprinting programs and to illustrate the chemical and statistical fundamentals needed for successful use of chemical fingerprinting.
Safety programmes in the Egyptian construction industry.
Hassanein, Amr A G; Hanna, Ragaa S
2007-12-01
This study is aimed at exploring the nature of the safety programmes applied by large-size contractors operating in Egypt. Results revealed that safety programmes applied by those contractors were less formal than the programmes applied by their American counterparts. Only three contractors out of the surveyed sample had accident records broken down by projects, provided workers with formal safety orientation, and trained safety personnel on first-aid. The study recommended that reforms to the scheme of the employers' contribution to social insurance are necessary. This is meant to serve as a strong incentive for safety management.
48 CFR 370.702 - Solicitation provision.
Code of Federal Regulations, 2011 CFR
2011-10-01
... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...
48 CFR 370.702 - Solicitation provision.
Code of Federal Regulations, 2013 CFR
2013-10-01
... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...
48 CFR 370.702 - Solicitation provision.
Code of Federal Regulations, 2014 CFR
2014-10-01
... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...
48 CFR 370.702 - Solicitation provision.
Code of Federal Regulations, 2012 CFR
2012-10-01
... implementation of HIV/AIDS programs under the President's Emergency Plan for AIDS Relief; or where the contractor will receive funding under the United States Leadership Against HIV/AIDS, Tuberculosis and Malaria Act...
Wu, Zezhou; Yu, Ann T W; Shen, Liyin
2017-02-01
The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.
Advanced Orion Optimized Laser System Analysis
NASA Technical Reports Server (NTRS)
1996-01-01
Contractor shall perform a complete analysis of the potential of the solid state laser in the very long pulse mode (100 ns pulse width, 10-30 hz rep-rate) and in the very short pulse mode (100 ps pulse width 10-30 hz rep rate) concentrating on the operation of the device in the 'hot-rod' mode, where no active cooling the laser operation is attempted. Contractor's calculations shall be made of the phase aberrations which develop during the repped-pulse train, and the results shall feed into the adaptive optics analyses. The contractor shall devise solutions to work around ORION track issues. A final report shall be furnished to the MSFC COTR including all calculations and analysis of estimates of bulk phase and intensity aberration distribution in the laser output beam as a function of time during the repped-pulse train for both wave forms (high-energy/long-pulse, as well as low-energy/short-pulse). Recommendations shall be made for mitigating the aberrations by laser re-design and/or changes in operating parameters of optical pump sources and/or designs.
75 FR 5996 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... and OMB Number: Synchronized Predeployment and Operational Tracker (SPOT) System; OMB Control Number... Operational Tracker (SPOT) System before deployment outside the United States. Data collection on contractors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... Director.) Specific conflict of interest rules that should apply to RACs for the Medicare Parts C and D... Remuneration (DIR). The DIR information reported by plans includes rebates paid by pharmaceutical manufacturers, as well as other remuneration received by the plan that has the effect of reducing their drug costs...
Flying a College on the Computer. The Use of the Computer in Planning Buildings.
ERIC Educational Resources Information Center
Saint Louis Community Coll., MO.
Upon establishment of the St. Louis Junior College District, it was decided to make use of computer si"ulation facilities of a nearby aero-space contractor to develop a master schedule for facility planning purposes. Projected enrollments and course offerings were programmed with idealized student-teacher ratios to project facility needs. In…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... Rates for Local Exchange Carriers; High-Cost Universal Service Support; Proposed Rule #0;#0;Federal... Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost... duplicating contractor, Best Copy and Printing, Inc., 445 12th Street SW., Room CY- B402, Washington, DC 20554...
Planning for Safety on the Jobsite. Safety in Industry, Construction Industry Series.
ERIC Educational Resources Information Center
Occupational Safety and Health Administration, Washington, DC.
Work injuries and their monetary losses in the construction industry can be effectively prevented only through an aggressive and well-planned safety effort. The purpose of this bulletin is to provide guidelines to aid the construction contractor in complying with legal requirements and in attaining the objective of keeping costly accidents and…
Apollo experience report: Guidance and control systems. Engineering simulation program
NASA Technical Reports Server (NTRS)
Gilbert, D. W.
1973-01-01
The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.
Hanford Site Anuran Monitoring Report for Calendar Year 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilde, Justin W.; Johnson, Scott J.; Lindsey, Cole T.
2014-02-13
The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and othermore » entities conducting activities on the Hanford Site are in compliance with NEPA.« less
Questionable payments for work of a contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-09-23
Examination of three support contracts for international R and D disclosed fundamental weaknesses in DOE controls over the (1) receipt and acceptance of goods and services, (2) authorization and payments for work, and (3) analyses of price proposals submitted by the contractor. As a result of these weaknesses, there was no clear and convincing record of what DOE got for most of the $2.5 million it spent on these contracts. Neither was there a downward adjustment in the amounts paid by DOE under two of the contracts although such an adjustment was required by the contracts. Much of the workmore » done by the contractor was not properly authorized. Finally, analyses by the San Francisco Operations Office of certain of the price proposals submitted by the contractor did not ensure that DOE obtained a fair and reasonable price. Recommendations addressed these issues to the Procurement Office, the Controller, the Assistant Secretaries for Conservation and Renewable Energy and Fossil Energy, and the Manager, San Francisco Operations Office who indicated general agreement with the findings and a willingness to immediately pursue the remedial measure that were recommended. Their comments are appended.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roodriguez, F.H.
1984-02-01
In October 1982, Conoco Irian Jaya as operator: and partners: Pertamina, Inpex Bintuni Limited, and Moeco Irian Jaya Company, mobilized construction equipment from Singapore to the KBS ''A'' contract area in Irian Jaya, Indonesia for the purpose of constructing a base camp and drill three exploratory sites. What made this construction effort different from others previously used in Irian Jaya; was that it incorporated several new and unique features, namely: a turnkey approach to construction; that is Conoco providing complete set of specifications and conditions with contractor assuming risks for a lump sum payment; special equipment designed by contractor formore » Irian Jaya operations; an incentive to co pensate or penalize contractor for helicopter hours flown below or above a predetermined number; structural steel pile platform designs for two swamp locations (Ayot and Aum), as opposed to the more conventional corduroy timber log-plank arrangement; and drilling rig pads designed for specific heli-rig with limited extra space. All work was successfully completed within the time frame stipulated in the contract, that is five months from the time the contractor was notified to begin mobilization of equipment, materials and personnel.« less
25 CFR 170.473 - What happens when a construction project ends?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... inspection, as well as contractors and maintenance personnel. (2) All project information must be made...
ERIC Educational Resources Information Center
School Planning & Management, 2002
2002-01-01
Several architects, planners, administrators, and contractors answer questions about trends related to school construction, interior design, business, security, and technology. Trends concern funding issues, specialized designs, planning for safety, technological integration, and equity in services. (EV)
VISION-BASED MONITORING AND CONTROL OF CONSTRUCTION OPERATIONS CARBON FOOTPRINT
Automated and continuous carbon footprint monitoring of construction operations support the contractors and project managers with information required for assessment on carbon footprint of various construction operation alternatives. This can ultimately lead to reduction of...
48 CFR 52.236-10 - Operations and Storage Areas.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...
48 CFR 52.236-10 - Operations and Storage Areas.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...
48 CFR 52.236-10 - Operations and Storage Areas.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...
48 CFR 52.236-10 - Operations and Storage Areas.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...
48 CFR 52.236-10 - Operations and Storage Areas.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...
Lessons Learned from the Puerto Rico Battery Energy Storage System
DOE Office of Scientific and Technical Information (OSTI.GOV)
BOYES, JOHN D.; DE ANA, MINDI FARBER; TORRES, WENCESLANO
1999-09-01
The Puerto Rico Electric Power Authority (PREPA) installed a distributed battery energy storage system in 1994 at a substation near San Juan, Puerto Rico. It was patterned after two other large energy storage systems operated by electric utilities in California and Germany. The U.S. Department of Energy (DOE) Energy Storage Systems Program at Sandia National Laboratories has followed the progress of all stages of the project since its inception. It directly supported the critical battery room cooling system design by conducting laboratory thermal testing of a scale model of the battery under simulated operating conditions. The Puerto Rico facility ismore » at present the largest operating battery storage system in the world and is successfully providing frequency control, voltage regulation, and spinning reserve to the Caribbean island. The system further proved its usefulness to the PREPA network in the fall of 1998 in the aftermath of Hurricane Georges. The owner-operator, PREPA, and the architect/engineer, vendors, and contractors learned many valuable lessons during all phases of project development and operation. In documenting these lessons, this report will help PREPA and other utilities in planning to build large energy storage systems.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation, management, conservation, improvement, or maintenance of such farm and its tools and equipment... operator's own agricultural operation. H-2A Labor Contractor (H-2ALC). Any person who meets the definition...: (1) Substantial continuity of the same business operations; (2) Use of the same facilities; (3...
1990-10-01
International Defense Cooperation Agreements; Quality Force Deployment; How Contractors See Systems Acquisition; DOD Metric Transition Plans and Actions; Proposals for Innovation In Service Quality . (sdw)
23 CFR 450.310 - Metropolitan planning organization designation and redesignation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... staff resources of other agencies, non-profit organizations, or contractors to carry out selected... serves a TMA; or (4) Periodic rotation of members representing units of general-purpose local government...
48 CFR 2009.570 - NRC organizational conflicts of interest.
Code of Federal Regulations, 2010 CFR
2010-10-01
... conflicts of interest. 2009.570 Section 2009.570 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570 NRC organizational conflicts of interest. ...
Consolidation and Centralization of Waste Operations Business Systems - 12319
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newton, D. Dean
This abstract provides a comprehensive plan supporting the continued development and integration of all waste operations and waste management business systems. These include existing systems such as ATMS (Automated Transportation Management System), RadCalc, RFITS (Radio Frequency Identification Transportation System) Programs as well as incorporating key components of existing government developed waste management systems and COTS (Computer Off The Shelf) applications in order to deliver a truly integrated waste tracking and management business system. Some of these existing systems to be integrated include IWTS at Idaho National Lab, WIMS at Sandia National Lab and others. The aggregation of data and consolidationmore » into a single comprehensive business system delivers best practices in lifecycle waste management processes to be delivered across the Department of Energy facilities. This concept exists to reduce operational costs to the federal government by combining key business systems into a centralized enterprise application following the methodology that as contractors change, the tools they use to manage DOE's assets do not. IWITS is one efficient representation of a sound architecture currently supporting multiple DOE sites from a waste management solution. The integration of ATMS, RadCalc and RFITS and the concept like IWITS into a single solution for DOE contractors will result in significant savings and increased efficiencies for DOE. Building continuity and solving collective problems can only be achieved through mass collaboration, resulting in an online community that DOE contractors and subcontractors access common applications, allowing for the collection of business intelligence at an unprecedented level. This is a fundamental shift from a solely 'for profit' business model to a 'for purpose' business model. To the conventional-minded, putting values before profit is an unfamiliar and unnatural way for a contractor to operate - unless however; your objective is to build a strong, strategic alliance across the enterprise in order to execute an unprecedented change in waste management, transportation and logistical operations. The success of such an initiative can be achieved by creating a responsible framework by enabling key individuals to 'own' the sustainability of the program. This includes the strategic collaboration of responsible revolutionaries covering application developers, information owners and federal stakeholders to ensure compliance, security and risk management are 'baked' into the process and sustainability is fostered through continued innovation by both technology and application functionality. This ensures that working software can adapt to changing circumstances and is the principle measure of the success of the program. The consolidation of waste management business systems must be achieved in order to realize efficiencies in information technology portfolio management, data integrity, business intelligence and the lifecycle management of hazardous materials within the DOE enterprise architecture. By identifying best practices across the enterprise and aggregating computational and application development resources, you can provide a unified, holistic solution serviceable from a single location while being accessed from anywhere. The business impact of integrating and delivering a unified solution would reduce costs to the Department of Energy within the first year of deployment with increased savings annually. (author)« less
Ground-based plasma contractor characterization
NASA Technical Reports Server (NTRS)
Patterson, Michael J.; Aadland, Randall S.
1987-01-01
Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.
Privatized Military Operations
2006-01-01
environment such as that in Abu Grahib prison , where military personnel tasked with similar duties to that of contractors have been held legally accountable... Grahib Prison . The Washington Post. Office of Management and Budget Circular A-76. (August 4, 1988. Revised 1999). Performance of Commercial...downsizes the military after the Global War on Terror as it did after the Cold War. Private contractors depend largely upon former service members to
US Army War College Key Strategic Issues List
2006-07-01
Soldier vs contractor operated and maintained tactical equipment. Are the new soldier systems so " high tech " that we cannot fight wars without contractors...approaches to meet the high tech skills demanded by our transformation TOEs? (G-3 ACD) 9. War and Society: a. Has the Army adapted from Industrial-Age...61 United States Military Academy ...................................... 65 U.S. Army Corps of Engineers
Contract Financing for Small Business
1981-11-01
problem. Small business contractors devote considerable management attention to operating capital and cash flow. Small business contractors are keenly...CONTRACT FINANCING 0FOR SMALL BUSINESS November 1981 -s Paul R. McClenon Prepared pursuant to Department of Defense Contract No. MDA903-81-C-0166...34 i 12 17046 DistIbufios Unlimted !I CONTRACT FINANCING FOR SMALL BUSINESS EXECUTIVE SUMMHARY To perform effectively on a contract, a firm needs
Injury experience in coal mining, 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reich, R.B.; Hugler, E.C.
1994-05-01
This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of coal mining in the United States for 1992. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and anthracite or bituminous coal. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison between coal mining and the metal and nonmetal mineral mining industries,more » summary reference tabulations are included at the end of both the operator and the contractor sections of this report.« less
Injury experience in coal mining, 1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1991-01-01
This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of coal mining in the United States for 1990. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and anthracite or bituminous coal. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison between coal mining and the metal and nonmetal mineral mining industries,more » summary reference tabulations are included at the end of both the operator and the contractor sections of this report.« less