47 CFR 1.83 - Applications for radio operator licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Applications for radio operator licenses. 1.83... Rules of Practice and Procedure Miscellaneous Proceedings § 1.83 Applications for radio operator licenses. (a) Application filing procedures for amateur radio operator licenses are set forth in part 97 of...
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...
10 CFR 55.51 - Issuance of licenses.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Issuance of licenses. 55.51 Section 55.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Licenses § 55.51 Issuance of licenses. Operator and senior operator licenses. If the Commission determines that an applicant for an operator license or a...
47 CFR 0.483 - Applications for amateur or commercial radio operator licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Applications for amateur or commercial radio operator licenses. 0.483 Section 0.483 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL..., and for Taking Examinations § 0.483 Applications for amateur or commercial radio operator licenses. (a...
47 CFR 13.13 - Application for a renewed or modified license.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 13.13 Section 13.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO... operator class must be filed on FCC Form 605. Each application for a commercial operator license involving... a period of 1 year. (d) Provided that a person's commercial radio operator license was not revoked...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... Docket ID NRC-2012-0283. You may submit comments by the following methods: Federal rulemaking Web site...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... ID NRC-2012-0131. You may submit comments by the following methods: Federal Rulemaking Web site: Go...
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS... Operator License, Marine Radio Operator Permit, First Class Radiotelegraph Operator's Certificate, Second... Restricted Radiotelephone Operator Permit or a Restricted Radiotelephone Operator Permit-Limited Use must be...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-17
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0090] Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0158] Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
... Facility Operating License Involving Proposed No Significant Hazards Consideration Determination; San... Operating License No. NPF-10, issued to Southern California Edison (SCE, the licensee), for operation of the... operating conditions'' and ``normal steady state full power operation'' and restricts operation to 70...
75 FR 57798 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean.../ Treasurer/CFO, (Qualifying Individual). Application Type: New NVO License. World Class Solutions LLC (NVO...
Guide for the preparation of applications for Nuclear Pharmacy Licenses
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-08-01
The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the possession, use, and distribution of by-product material in nuclear pharmacy operations.
75 FR 60124 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean..., Application Type: New OFF License Myunghe Choi dba World Express Shipping (NVO), 4733 Torrance Blvd., 187...
10 CFR 34.11 - Application for a specific license.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...
10 CFR 34.11 - Application for a specific license.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...
10 CFR 34.11 - Application for a specific license.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...
10 CFR 34.11 - Application for a specific license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...
10 CFR 34.11 - Application for a specific license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Specific Licensing Provisions § 34.11 Application for a... industrial radiography on NRC Form 313, “Application for Material License,” in accordance with the provisions...
77 FR 52736 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
77 FR 58378 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
78 FR 50054 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
78 FR 56229 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-12
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
77 FR 43599 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
78 FR 53456 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-29
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
78 FR 23252 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-18
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
78 FR 3424 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-16
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
78 FR 33841 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
78 FR 69852 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants The Commission gives notice that the following applicants have filed an application for an Ocean Transportation Intermediary (OTI) license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF...
75 FR 4560 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... license as a Non-Vessel-Operating Common Carrier and Ocean Freight Forwarder--Ocean Transportation..., DC 20573. Non-Vessel-Operating Common Carrier--Ocean Transportation Intermediary Applicants: Doma... (Qualifying Individual), Rafia S. Waheed, President. Non-Vessel-Operating Common Carrier and Ocean Freight...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-11
... Generating Station Energy Northwest has submitted an application for renewal of Facility Operating License No... license for CGS expires on December 20, 2023. The application for renewal, dated January 19, 2010, was... and opportunity for hearing regarding renewal of the facility operating licenses is also being...
76 FR 27643 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-12
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean...
77 FR 5013 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-01
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby given that the following applicants have filed with the Federal Maritime Commission an application for a license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean...
10 CFR 60.22 - Filing and distribution of application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GEOLOGIC REPOSITORIES Licenses License Applications § 60.22 Filing and distribution of application. (a) An application for a construction authorization for a high-level radioactive waste repository at a geologic repository operations area, and an application for a license to receive and possess source, special nuclear...
10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
76 FR 10420 - Delegation of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-24
... Standard Operating Procedure 00 01 2, Chapter 3, paragraph 2, or is unable to perform the functions and... to the Administrator for approval applications for licenses to operate as a small business investment... authorities granted by the Administrator to recommend and approve applications for a license to operate as a...
14 CFR 420.29 - Launch site location review for unproven launch vehicles.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.29 Launch site location review for unproven launch vehicles. An applicant for a license to operate a launch site for an unproven launch vehicle shall...
14 CFR 420.29 - Launch site location review for unproven launch vehicles.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.29 Launch site location review for unproven launch vehicles. An applicant for a license to operate a launch site for an unproven launch vehicle shall...
76 FR 34992 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-15
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean... License Echo Trans World, Inc. (NVO), 462 7th Avenue, 14th Floor, New York, NY 10018, Officer: Moshe...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-13
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...
47 CFR 25.170 - Annual reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SATELLITE COMMUNICATIONS Applications and Licenses Reporting Requirements for Space Station Operators § 25.170 Annual reporting requirements. All operators of U.S.-licensed space stations and operators of non-U.S.-licensed space stations granted U.S. market access must, on June 30 of each year, file a report...
75 FR 31438 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-03
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License Applicants Notice is hereby... application for a license as a Non- Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI) pursuant to section 19 of the Shipping Act of 1984 as amended...
47 CFR 80.53 - Application for a portable ship station license.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...
47 CFR 80.53 - Application for a portable ship station license.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...
47 CFR 80.53 - Application for a portable ship station license.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...
47 CFR 80.53 - Application for a portable ship station license.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...
47 CFR 80.53 - Application for a portable ship station license.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Application for a portable ship station license... a portable ship station license. The Commission may grant a license permitting operation of a portable ship station aboard different vessels of the United States. [63 FR 68956, Dec. 14, 1998] ...
77 FR 24712 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-25
... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section... authority to issue and make immediately effective any amendment to an operating license upon a determination... electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site http://www...
47 CFR 97.19 - Application for a vanity call sign.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.19 Application for a vanity call sign. (a) The person named in an operator/primary station license grant or in a club station license grant is eligible... for a vanity call sign. (b) Each application for a modification of an operator/primary or club station...
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Eligibility and application for new license or endorsement. 13.9 Section 13.9 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.9 Eligibility and application for new license or endorsement. (a) If found qualified...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... License Application To Comply With Enhancements to Emergency Preparedness Rule AGENCY: Nuclear Regulatory... exemption from addressing enhancements to the Emergency Preparedness (EP) rules in their Combined License..., 2013, [[Page 75382
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-31
...On May 29, 2013, Exelon Generation Company, LLC (Exelon) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for renewal of Facility Operating Licenses (NPF-72 and NPF-77) for an additional 20 years of operation for Braidwood Station, Units 1 and 2. Braidwood Station is located in Will County, Illinois. The current operating licenses for Braidwood Station, Units 1 and 2, expire on October 17, 2026 and December 18, 2027, respectively. This notice advises the public that the NRC intends to gather information to prepare an EIS on the proposed license renewal.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-28
...; Notice of Withdrawal of Application for Amendment to Renewed Facility Operating License The U.S. Nuclear... December 9, 2010, for a proposed amendment to Renewed Facility Operating License No. NPF-63 for the Shearon... Pressurized Water Reactors,'' to the Core Operating Limits Report methodologies list. This change would have...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
... Operations Management Tricon Programmable Logic Controller (PLC), Version 10, and the CS Innovations, LLC... process protection system that is based on the Invensys Operations Management Tricon Programmable Logic...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... Licenses I Carolina Power & Light Company (CP&L, the licensee) and North Carolina Eastern Municipal Power... operating licenses authorize CP&L to possess, use, and operate the Brunswick facility. II By application... indirect transfer of control of the facility operating licenses for Brunswick, to the extent held by CP&L...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2008-0672] License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear Operations, Inc. AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to final...
77 FR 26008 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean... Consulting LLC dba World, Maritime NVOCC (OFF), 2081 Raritan Road, Scotch Plains, NJ 07076, Officers: Robin...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0231] Applications and Amendments to Facility Operating... Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive... describes a different method for submitting comments on a specific subject): Federal Rulemaking Web site: Go...
Site Operators License: Guidelines for Applicants
DOT National Transportation Integrated Search
1995-08-08
The U. S. Department of Transportation's Office of Commercial Space : Transportation (OCST) issues site operator licenses based on the site : operator's demonstration of the ability to ensure public safety and the : safety of property, both on and of...
47 CFR 1.957 - Procedure with respect to amateur radio operator license.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Procedure with respect to amateur radio... AND PROCEDURE Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each candidate for an amateur...
47 CFR 1.957 - Procedure with respect to amateur radio operator license.
Code of Federal Regulations, 2013 CFR
2013-10-01
... AND PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each... 47 Telecommunication 1 2013-10-01 2013-10-01 false Procedure with respect to amateur radio...
47 CFR 1.957 - Procedure with respect to amateur radio operator license.
Code of Federal Regulations, 2011 CFR
2011-10-01
... AND PROCEDURE Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each candidate for an amateur... 47 Telecommunication 1 2011-10-01 2011-10-01 false Procedure with respect to amateur radio...
47 CFR 1.957 - Procedure with respect to amateur radio operator license.
Code of Federal Regulations, 2014 CFR
2014-10-01
... AND PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each... 47 Telecommunication 1 2014-10-01 2014-10-01 false Procedure with respect to amateur radio...
47 CFR 1.957 - Procedure with respect to amateur radio operator license.
Code of Federal Regulations, 2012 CFR
2012-10-01
... AND PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.957 Procedure with respect to amateur radio operator license. Each... 47 Telecommunication 1 2012-10-01 2012-10-01 false Procedure with respect to amateur radio...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0272] Applications and Amendments to Facility Operating... Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive... submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Applications and Licenses Earth Stations § 25.134 Licensing provisions for Very Small Aperture Terminal (VSAT... affected adjacent satellite operators by the operation of the non-conforming earth station. (b) VSAT...) VSAT networks operating in the 12/14 GHz bands may use more than one hub earth station, and the hubs...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... endorsement. 13.9 Section 13.9 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO..., the following persons are eligible to apply for commercial radio operator licenses: (1) Any person..., no person shall be eligible to be issued a commercial radio operator license when (i) The person's...
77 FR 27457 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
... FEDERAL MARITIME COMMISSION Ocean Transportation Intermediary License; Applicants Notice is hereby... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean... at (202) 523-5843 or by email at [email protected] . DTS World Cargo Services, Inc. dba DTS World Cargo...
10 CFR 55.35 - Re-applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Re-applications. 55.35 Section 55.35 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Applications § 55.35 Re-applications. (a) An applicant whose application for a license has been denied because of failure to pass the written examination or...
47 CFR 5.81 - Discontinuance of station operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... THAN BROADCAST) Applications and Licenses § 5.81 Discontinuance of station operation. In case of... mobile station in the Experimental Radio Service, the licensee shall forward the station license to the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
...; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards... submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and...: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0139. NRC...
10 CFR 55.57 - Renewal of licenses.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Renewal of licenses. 55.57 Section 55.57 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Licenses § 55.57 Renewal of licenses. (a) The applicant for renewal of a license shall— (1) Complete and sign Form NRC-398 and include the number of the...
77 FR 69663 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-20
... required or asked to report: Holders of and applicants for facility (i.e., nuclear power, non-power research and test reactor) operating licenses and individual operators; licenses. 5. The number of annual...
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.4 Application. No person subject to the jurisdiction and/or control of the United States may operate a private remote sensing space system without a...
Code of Federal Regulations, 2011 CFR
2011-01-01
... SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.4 Application. No person subject to the jurisdiction and/or control of the United States may operate a private remote sensing space system without a...
Code of Federal Regulations, 2013 CFR
2013-01-01
... SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.4 Application. No person subject to the jurisdiction and/or control of the United States may operate a private remote sensing space system without a...
Code of Federal Regulations, 2012 CFR
2012-01-01
... SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.4 Application. No person subject to the jurisdiction and/or control of the United States may operate a private remote sensing space system without a...
Code of Federal Regulations, 2014 CFR
2014-01-01
... SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS Licenses § 960.4 Application. No person subject to the jurisdiction and/or control of the United States may operate a private remote sensing space system without a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0241] Biweekly Notice; Applications and Amendments to Facility Operating Licenses; Involving No Significant Hazards Considerations Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
...), Rockville, Maryland 20852 and is accessible from the NRC's Agencywide Documents Access and Management System... Facility Operating License Nos. NPF-39 and NPF-85 for an Additional 20-Year Period, Exelon Generation...) is considering an application for the renewal of operating licenses NPF-39 and NPF-85, which...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-06
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0205] Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing thi...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0040] Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0019] Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...
Code of Federal Regulations, 2010 CFR
2010-01-01
... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...
47 CFR 87.43 - Operation during emergency.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.43 Operation during emergency. A station may be used for emergency communications in a manner other than that specified in the station license or in the operating rules when normal...
47 CFR 87.45 - Time in which station is placed in operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.45 Time in which station is placed..., excluding radionavigation land test stations. When a new license has been issued or additional operating...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... the requirement for organizational independence of the operations, health physics, and quality... personnel will no longer be required to protect public health and safety. 1. Does the proposed change...
47 CFR 87.35 - Cancellation of license.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Cancellation of license. 87.35 Section 87.35 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.35 Cancellation of license. When a station permanently discontinues operation...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE General § 420.1 Scope. This part prescribes the information and demonstrations that must be provided to the FAA as part of a license application, the bases for license approval...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE General § 420.1 Scope. This part prescribes the information and demonstrations that must be provided to the FAA as part of a license application, the bases for license approval...
47 CFR 87.35 - Cancellation of license.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Cancellation of license. 87.35 Section 87.35 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.35 Cancellation of license. When a station permanently discontinues operation...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each initial license for an earth... the earth station must be completed and the station must be brought into operation within 12 months...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247-LR and 50-286-LR; ASLBP No. 07-858-03-LR-BD01] Atomic Safety and Licensing Board; Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3); Notice of Hearing (Application for License Renewal) June 8, 2012. Before Administrative Judges: Lawrence G. McDade, Chairman, Dr....
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
47 CFR 5.51 - Eligibility of license.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Eligibility of license. 5.51 Section 5.51...) Applications and Licenses § 5.51 Eligibility of license. (a) Authorizations for stations in the Experimental... for scientific or technical operation data directly related to a use of radio not provided by existing...
47 CFR 80.13 - Station license required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...
47 CFR 80.13 - Station license required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...
47 CFR 80.13 - Station license required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...
47 CFR 80.13 - Station license required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...
47 CFR 80.13 - Station license required.
Code of Federal Regulations, 2013 CFR
2013-10-01
... individually or by fleet. (b) One ship station license will be granted for operation of all maritime services... be authorized, however, unless specifically requested by the applicant. (c) A ship station is licensed by rule and does not need an individual license issued by the FCC if the ship station is not...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... degrees Fahrenheit ([deg]F) as a consequence of inservice leak and hydrostatic testing, and as a consequence of scram time testing initiated in conjunction with an inservice leak or hydrostatic test, while... [Limited Conditions of Operation] 3.10.1, Inservice Leak and Hydrostatic Testing Operation Using...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-10
... operation of the shared unit's diesel generator (emergency power) and to assure long term operation of the... actuation system limiting safety system settings, and emergency diesel generator surveillance start voltage... specification for the Vogtle Electric Generating Plant, Units 1 and 2, associated with the ``Steam Generator (SG...
Code of Federal Regulations, 2010 CFR
2010-01-01
... and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Payload Review and Determination § 415.51 General. The FAA reviews a payload proposed for launch to determine whether a license applicant or payload owner or operator has...
Code of Federal Regulations, 2011 CFR
2011-01-01
... and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Payload Review and Determination § 415.51 General. The FAA reviews a payload proposed for launch to determine whether a license applicant or payload owner or operator has...
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2012 CFR
2012-01-01
... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2010 CFR
2010-01-01
... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2011 CFR
2011-01-01
... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
10 CFR 55.33 - Disposition of an initial application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... performance of assigned operator job duties or cause operational errors endangering public health and safety... and tests determine whether the applicant for an operator's license has learned to operate a facility competently and safely, and additionally, in the case of a senior operator, whether the applicant has learned...
18 CFR 4.31 - Initial or competing application: who may file.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...
18 CFR 4.31 - Initial or competing application: who may file.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...
18 CFR 4.31 - Initial or competing application: who may file.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...
18 CFR 4.31 - Initial or competing application: who may file.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...
18 CFR 4.31 - Initial or competing application: who may file.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...
47 CFR 97.17 - Application for new license grant.
Code of Federal Regulations, 2013 CFR
2013-10-01
... provides voluntary, uncompensated and unreimbursed services in providing club and military recreation... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.17 Application for new license grant. (a) Any qualified person is eligible to apply for a new operator/primary station, club station or military...
47 CFR 97.17 - Application for new license grant.
Code of Federal Regulations, 2012 CFR
2012-10-01
... provides voluntary, uncompensated and unreimbursed services in providing club and military recreation... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.17 Application for new license grant. (a) Any qualified person is eligible to apply for a new operator/primary station, club station or military...
76 FR 33757 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
... Club Drive, Bensenville, IL 60106. Officers: Dale Jordon, Director (Operations), (Qualifying Individual...), Application Type: Add OFF Service. Oceanic Link USA LLC (NVO & OFF), 5430 Jimmy Carter Blvd., Suite 216... NVO & OFF License. The Ultimate Logistics Service Corporation (NVO & OFF), 3 Birch Place, Pine Brook...
47 CFR 97.17 - Application for new license grant.
Code of Federal Regulations, 2014 CFR
2014-10-01
... provides voluntary, uncompensated and unreimbursed services in providing club and military recreation... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.17 Application for new license grant. (a) Any qualified person is eligible to apply for a new operator/primary station, club station or military...
47 CFR 97.17 - Application for new license grant.
Code of Federal Regulations, 2011 CFR
2011-10-01
... provides voluntary, uncompensated and unreimbursed services in providing club and military recreation... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.17 Application for new license grant. (a) Any qualified person is eligible to apply for a new operator/primary station, club station or military...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... safety-related batteries would remain operable if all the inter-cell and terminal connections were at the... new acceptance criteria for total battery connection resistance to ensure that the safety-related batteries can perform their specified safety function. Basis for proposed no significant hazards...
75 FR 77947 - Qualification of Drivers; Exemption Applications; Diabetes Mellitus
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... 2010 and certified that he does not have diabetic retinopathy. He holds a Class A operator's license... diabetic retinopathy. He holds a Class D operator's license from Kentucky. Allen C. Cornelius Mr. Cornelius...). His ophthalmologist examined him in 2010 and certified that he does not have diabetic retinopathy. He...
10 CFR 51.53 - Postconstruction environmental reports.
Code of Federal Regulations, 2014 CFR
2014-01-01
... renewal of a license to operate a nuclear power plant under part 54 of this chapter shall submit with its... for a nuclear power reactor shall submit this report only in connection with the first licensing action authorizing full-power operation. In this report, the applicant shall discuss the same matters...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non... document. You may submit comments by any one of the following methods: Federal Rulemaking Web Site: Go to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
.../diminished. There are no design changes associated with this TS amendment. The DC power system/batteries will... changes restructure the Technical Specifications (TS) for the direct current (DC) electrical power system... battery and battery charger operability requirements. The DC electrical power system, including associated...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile earth stations, shall specify as a condition therein the period in...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... Combined License Application To Comply With Enhancements to Emergency Preparedness Rule AGENCY: Nuclear... an exemption from addressing enhancements to the Emergency Preparedness (EP) rules in their Combined... to Emergency Preparedness Regulations. EOI's requested exemption is seen as an open-ended, one-time...
76 FR 71034 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
... license as a Non-Vessel-Operating Common Carrier (NVO) and/or Ocean Freight Forwarder (OFF)--Ocean Transportation Intermediary (OTI) pursuant to section 19 of the Shipping Act of 1984 as amended (46 U.S.C..., Jamaica, NY 11434. Officer: Demba S. Ba, Owner/Member Manager (Qualifying Individual). Application Type...
Code of Federal Regulations, 2010 CFR
2010-04-01
... INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR GAMING LICENSES AND BACKGROUND INVESTIGATIONS FOR KEY EMPLOYEES AND PRIMARY MANAGEMENT OFFICIALS GAMING LICENSES FOR KEY EMPLOYEES AND PRIMARY... at a gaming operation, a tribe shall: (1) Forward to the Commission a completed application for...
47 CFR 1.62 - Operation pending action on renewal application.
Code of Federal Regulations, 2010 CFR
2010-10-01
... on its face that it relates to an activity not of a continuing nature, or where the non-continuing.... 1.62 Section 1.62 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE... license any proper and timely application for renewal of license with respect to any activity of a...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-14
... would use a combination of partial credit for soluble boron, Boral\\TM\\ for Region 1, burnup, rod cluster... storage racks or the new fuel handling processes. Operation of the SFP utilizes soluble boron; crediting this boron for criticality control does not change the probability of any accident. The proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-13
... diesel generator surveillance requirements. Margin of safety is related to the ability of the fission... surveillance tests, allowing testing in any MODE of operation. The Division 3 AC sources, including the diesel generator (DG) and its associated emergency loads are accident mitigating features, not accident initiators...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
...). The proposed amendment would approve the cyber security plan and implementation schedule, and revise... maintain in effect all provisions of the NRC-approved cyber security plan. Basis for proposed no... [facility operating license] to implement and maintain a Cyber Security Plan as part of Energy Northwest's...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... Operating Licenses include: (1) The proposed Cyber Security Plan for CCNPP, Ginna, and NMPNS, (2) an... provisions of the Nuclear Regulatory Commission-approved Cyber Security Plan for CCNPP, Ginna, and NMPNS as... Communication Systems and Networks,'' establish the requirements for a cyber security program. This regulation...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-09
...-safeguards information (SUNSI). The amendments would approve the proposed Cyber Security Plan and... Commission-approved Cyber Security Plan as required by 10 CFR 73.54. Basis for proposed no significant... Facility Operating License (FOL) to implement and maintain a Cyber Security Plan as part of the facility's...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these.... The operational and management controls, as described in Nuclear Energy Institute (NEI) 08-09... in Nuclear Energy Institute (NEI) 08-09, Revision 6, would be implemented concurrent with the full...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-26
... Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, and Nuclear Energy... 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or... cyber security controls only. The operational and management controls, as described in Nuclear Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
....; Combined License Application for River Bend Unit 3, Exemption From the Requirements To Update a Final... Feliciana Parish. The NRC accepted for docketing the River Bend Station Unit 3 (RBS3) COL application on... the requirements of 10 CFR 50.71(e)(3)(iii) pertaining to the River Bend Station Unit 3 COL...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-025 and 52-026; NRC-2008-0252] Southern Nuclear... Atomic Energy Act and Title 10 of the Code of Federal Regulations (10 CFR) Part 52, ``Licenses... of 10 CFR Part 52. The information submitted by the applicant includes certain administrative...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-025 and 52-026; NRC-2008-0252] Southern Nuclear... Atomic Energy Act and Title 10 of the Code of Federal Regulations (10 CFR) Part 52, ``Licenses... of 10 CFR Part 52. The information submitted by the applicant includes certain administrative...
47 CFR 97.19 - Application for a vanity call sign.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.19 Application for a vanity call sign. (a) The person named in an operator/primary station license grant or in a club station license grant is eligible... sign selected by the vanity call sign system. Effective February 14, 2011, the person named in a club...
47 CFR 97.19 - Application for a vanity call sign.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.19 Application for a vanity call sign. (a) The person named in an operator/primary station license grant or in a club station license grant is eligible... sign selected by the vanity call sign system. Effective February 14, 2011, the person named in a club...
47 CFR 97.19 - Application for a vanity call sign.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.19 Application for a vanity call sign. (a) The person named in an operator/primary station license grant or in a club station license grant is eligible... sign selected by the vanity call sign system. Effective February 14, 2011, the person named in a club...
47 CFR 97.19 - Application for a vanity call sign.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SERVICES AMATEUR RADIO SERVICE General Provisions § 97.19 Application for a vanity call sign. (a) The person named in an operator/primary station license grant or in a club station license grant is eligible... sign selected by the vanity call sign system. Effective February 14, 2011, the person named in a club...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
... Collection; Comment Request; Licensing of Private Remote-Sensing Space Systems AGENCY: National Oceanic and... for the licensing of private operators of remote-sensing space systems. The information in applications and subsequent reports is needed to ensure compliance with the Land Remote- Sensing Policy Act of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... Commission's 1996 findings on the environmental impacts of renewing the operating license of a nuclear power.... Specifically, the final rule amends Table B-1 by redefining the number and scope of the environmental impact... is publishing Revision 1 to NUREG-1437, ``Generic Environmental Impact Statement for License Renewal...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
...-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to... reverse osmosis system during normal plant operation to purify the water in the borated water storage... result of water returned from the RO System with lower boron concentration. Thus, no adverse effects from...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-14
... leak rate test following the replacement of the steam generators in Unit 2. The intent of post... to be publicly disclosed. The NRC posts all comment submissions at http://www.regulations.gov as well... evaluated? Response: No. There are no changes to design, no changes to operating procedures and the revised...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... provide post accident design basis cooling. Therefore, the proposed change does not involve a significant... operating margin inherent in the design orifices of the RHR suppression pool cooling test return line and... information in comment submissions that you do not want to be publicly disclosed. The NRC posts all comment...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-07
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-302; NRC-2009-0039] Crystal River Nuclear Generating... in ADAMS) is provided the first time that a document is referenced. NRC's PDR: You may examine and... operating license DPR-72, which authorizes Florida Power Corporaton (FPC) to operate the Crystal River...
34 CFR 395.7 - The issuance and conditions of licenses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... licensing qualified applicants, including a provision for giving preference to blind persons who are in need... United States; and (3) Certified by the State vocational rehabilitation agency as qualified to operate a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the..., containment isolation, or radiological release assumptions used in evaluating the radiological consequences of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
... proposed change would not change the current limiting EDG [emergency diesel generator] failure but would... evaluated? Response: No. The proposed change would not change the current EDG [emergency diesel generator...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
..., such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC... range monitoring (APRM) system ``Upscale'' and ``Inoperative'' scram and control rod withdrawal block...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Defense Trade Controls to the Defense Security Service of the Department of Defense in accordance with the provisions of the Department of Defense National Industrial Security Program Operating Manual (unless such... a copy of the license to the applicant for the applicant's information. The Defense Security Service...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-15
... law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief... that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall... home phone numbers in their filings, unless an NRC regulation or other law requires submission of such...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... NUCLEAR REGULATORY COMMISSION [Docket No. 52-016; NRC-2008-0250] UniStar Nuclear Energy, Combined License Application for Calvert Cliffs Power Plant, Unit 3, Exemption 1.0 Background UniStar Nuclear Energy (UNE), on behalf of Calvert Cliffs Nuclear Project, LLC and UniStar Nuclear Operating Services...
Code of Federal Regulations, 2010 CFR
2010-01-01
... State Materials and Environmental Management Programs, or Director, Office of Nuclear Material Safety... Reorganization Act, and this chapter, he will issue a license. If the license is for a facility, or for receipt... operations area under parts 60 or 63 of this chapter, or if it is to receive and possess high-level...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... accident previously evaluated? Response: No The design function of the WLS is containment isolation and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... pressurizer PORV block valves provide isolation for a postulated stuck-open or leaking PORV. Isolation is...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-30
... transmission, the E-Filing system time-stamps the document and sends the submitter an email notice confirming... hot channel factor, nuclear enthalpy rise hot channel factor, loss of coolant accident peak cladding...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... Application for Byron Station, Units 1 and 2; Exelon Generation Company, LLC AGENCY: Nuclear Regulatory..., Units 1 and 2 (Byron). Byron Station is located in Byron, Illinois. The current operating license for Byron Station, Unit 1, expires on October 31, 2024, and Unit 2, expires on November 6, 2026. DATES: The...
47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.
Code of Federal Regulations, 2014 CFR
2014-10-01
... must pass an examination for the issuance of a new Ship Radar Endorsement. Each application for the... License: Written Elements 1, 3, and 9. (7) Ship Radar Endorsement: Written Element 8. [58 FR 9124, Feb. 19...
47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.
Code of Federal Regulations, 2013 CFR
2013-10-01
... must pass an examination for the issuance of a new Ship Radar Endorsement. Each application for the... License: Written Elements 1, 3, and 9. (7) Ship Radar Endorsement: Written Element 8. [58 FR 9124, Feb. 19...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-11
... interval extension is bounded by the 15 year ILRT Interval currently authorized within NEI [Nuclear Energy... following benefits: (1) Allows the plant to reach the all-rods-in condition prior to significant reactor...
The effectiveness of written driver knowledge tests.
DOT National Transportation Integrated Search
1979-01-01
Highway Safety Program Standard 5, Driver Licensing, issued by the U. S. Department of Transportation requires, in part, that the states test applicants for a renewal of their operator's license on rules of the road at least once every 4 years. The s...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-14
...-stamps the document and sends the submitter an email notice confirming receipt of the document. The E... necessary to minimize bypassing of the ice condenser by the hot steam and air mixture released into the...
10 CFR 55.45 - Operating tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Operating tests. 55.45 Section 55.45 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.45 Operating tests. (a) Content. The operating tests administered to applicants for operator and senior...
78 FR 59359 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... (QI), Gregory M. Hinton, Operating Manager, Application Type: QI Change. Safe Movers, Inc. dba Isaac's..., Treasurer (QI), Ami Joseph, President, Application Type: Change Trade Name to Isaac's Moving & Storage. U.S...
The short-term effectiveness of written driver knowledge tests.
DOT National Transportation Integrated Search
1978-01-01
Highway Safety Program Standard 5, Driver Licensing, issued by the U. S. Department of Transportation requires the states to test applicants for a renewal of their operator's license on rules of the road at least once every four years. The cost of ad...
14 CFR 433.9 - Environmental information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental information. 433.9 Section..., DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.9 Environmental information. An applicant shall submit environmental information concerning a proposed reentry site not covered by...
Code of Federal Regulations, 2011 CFR
2011-07-01
... § 192.32 Standards. (a) Standards for application during processing operations and prior to the end of... nonoperational and subject to a license by the Nuclear Regulatory Commission or an Agreement State shall limit... the Nuclear Regulatory Commission or Agreement State into individual site licenses. (ii) The Nuclear...
Code of Federal Regulations, 2010 CFR
2010-07-01
... § 192.32 Standards. (a) Standards for application during processing operations and prior to the end of... nonoperational and subject to a license by the Nuclear Regulatory Commission or an Agreement State shall limit... the Nuclear Regulatory Commission or Agreement State into individual site licenses. (ii) The Nuclear...
47 CFR 74.431 - Special rules applicable to remote pickup stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... damaged, stations licensed under Subpart D may be used to provide temporary circuits for a period not... SERVICES Remote Pickup Broadcast Stations § 74.431 Special rules applicable to remote pickup stations. (a..., frequency coordination, establishing microwave links, and operational communications. Operational...
47 CFR 74.431 - Special rules applicable to remote pickup stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... damaged, stations licensed under Subpart D may be used to provide temporary circuits for a period not... SERVICES Remote Pickup Broadcast Stations § 74.431 Special rules applicable to remote pickup stations. (a..., frequency coordination, establishing microwave links, and operational communications. Operational...
47 CFR 74.431 - Special rules applicable to remote pickup stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... damaged, stations licensed under Subpart D may be used to provide temporary circuits for a period not... SERVICES Remote Pickup Broadcast Stations § 74.431 Special rules applicable to remote pickup stations. (a..., frequency coordination, establishing microwave links, and operational communications. Operational...
47 CFR 74.431 - Special rules applicable to remote pickup stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... damaged, stations licensed under Subpart D may be used to provide temporary circuits for a period not... SERVICES Remote Pickup Broadcast Stations § 74.431 Special rules applicable to remote pickup stations. (a..., frequency coordination, establishing microwave links, and operational communications. Operational...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-10
... must be one which, if proven, would entitle the requestor/petitioner to relief. A requestor/ petitioner..., and fire modeling calculations, have been performed to demonstrate that the performance-based... may include engineering evaluations, probabilistic safety assessments, and fire modeling calculations...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE LICENSING OF PRIVATE REMOTE SENSING SYSTEMS General § 960.3 Definitions. For purposes of the regulations in this part, the following terms have the following meanings: Act means the Land Remote Sensing... application for a NOAA license to operate a remote sensing space system. Assistant Administrator means the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-11
...; Diablo Canyon Power Plant, Units 1 and 2; Application for Amendment to Facility Operating License AGENCY... (PDR) reference staff at 1-800-397-4209, 301-415- 4737, or by email to [email protected] . The ADAMS... License Nos. DPR-80 and DPR-82 for the Diablo Canyon Power Plant, Units 1 and 2, located in San Luis...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Uleck, R.B.; DeFino, C.V.
1991-12-31
The Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) assigned States the responsibility to provide for disposal of commercial low-level radioactive waste (LLRW) by 1993. The LLRWPAA also required the US Nuclear Regulatory Commission (NRC) to establish procedures and develop the technical review capability to process license applications for new LLRW disposal facilities. Under the LLRWPAA, NRC is required, to the extent practicable, to complete its review of an LLRW disposal facility license application within 15 months of its submittal by a State. This provision of the LLRWPAA helps ensure that NRC, in addition to protecting public health andmore » safety and the environment, facilitates States` achievement of LLRWPAA milestones for new facility development. A timely NRC review is needed for States to accomplish their objective of having new disposal facilities in operation on the dates prescribed in the LLRWPAA. To help assure NRC and States` compliance with the provisions of the LLRWPAA, NRC has developed a licensing review strategy that includes: (1) the further development of regulatory guidance, (2) enhancement of licensing review capability, and (3) prelicensing regulatory consultation with potential applicants.« less
Function of university reactors in operator licensing training for nuclear utilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wicks, F.
1985-11-01
The director of the Division of the US Nuclear Regulatory Commission in generic letter 84-10, dated April 26, 1984, spoke the requirement that applicants for senior reactor operator licenses for power reactors shall have performed then reactor startups. Simulator startups were not acknowledged. Startups performed on a university reactor are acceptable. The content and results of a five-day program combining instruction and experiments with the Rensselaer reactor are summarized.
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-04
..., or other interest in the proceeding; and (4) the possible effect of any decision or order which may... the fuel, the required diesel generator output and the corresponding fuel oil consumption rate..., to expand its scope to include provisions for temperature excursions...
10 CFR 55.21 - Medical examination.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Medical examination. 55.21 Section 55.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Medical Requirements § 55.21 Medical examination. An applicant for a license shall have a medical examination by a physician. A licensee shall have a medical...
10 CFR 55.21 - Medical examination.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Medical examination. 55.21 Section 55.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Medical Requirements § 55.21 Medical examination. An applicant for a license shall have a medical examination by a physician. A licensee shall have a medical...
10 CFR 55.21 - Medical examination.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Medical examination. 55.21 Section 55.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Medical Requirements § 55.21 Medical examination. An applicant for a license shall have a medical examination by a physician. A licensee shall have a medical...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-26
... addition, the requestor/petitioner shall provide a brief explanation of the bases for the contention and a..., malfunctions, or accident initiators not considered in the design and licensing bases. The proposed amendment... technical specifications (TSs) requirements related to primary containment isolation instrumentation in...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Share time. 73.1715 Section 73.1715... Rules Applicable to All Broadcast Stations § 73.1715 Share time. Operation is permitted by two or more... considered part of their licenses. (a) If the licenses of stations authorized to share time do not specify...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Share time. 73.1715 Section 73.1715... Rules Applicable to All Broadcast Stations § 73.1715 Share time. Operation is permitted by two or more... considered part of their licenses. (a) If the licenses of stations authorized to share time do not specify...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Share time. 73.1715 Section 73.1715... Rules Applicable to All Broadcast Stations § 73.1715 Share time. Operation is permitted by two or more... considered part of their licenses. (a) If the licenses of stations authorized to share time do not specify...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Share time. 73.1715 Section 73.1715... Rules Applicable to All Broadcast Stations § 73.1715 Share time. Operation is permitted by two or more... considered part of their licenses. (a) If the licenses of stations authorized to share time do not specify...
10 CFR 55.9 - Completeness and accuracy of information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Completeness and accuracy of information. 55.9 Section 55.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.9 Completeness and accuracy of information. Information provided to the Commission by an applicant for a license...
10 CFR 55.21 - Medical examination.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Medical examination. 55.21 Section 55.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Medical Requirements § 55.21 Medical examination. An applicant for a license shall have a medical examination by a physician. A licensee shall have a medical...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
.... ML111940200), which approved the RBS Cyber Security Plan and associated implementation milestone schedule. The Cyber Security Plan Implementation Schedule contained in the licensee's letter dated April 4, 2011... consequences of an accident previously evaluated? Response: No. The proposed change to the Cyber Security Plan...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
10 CFR 55.9 - Completeness and accuracy of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Completeness and accuracy of information. 55.9 Section 55.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.9 Completeness and accuracy of information. Information provided to the Commission by an applicant for a license...
10 CFR 55.21 - Medical examination.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Medical examination. 55.21 Section 55.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Medical Requirements § 55.21 Medical examination. An applicant for a license shall have a medical examination by a physician. A licensee shall have a medical...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... PWR [Pressurized-Water Reactor] Steam Generator Tubes'' (Reference 32) and [Nuclear Energy Institute... maintains the required structural margins of the SG tubes for both normal and accident conditions. Nuclear Energy Institute 97-06, ``Steam Generator Program Guidelines'' (Reference 8), and NRC Regulatory Guide 1...
78 FR 9745 - Kewaunee Power Station; Application for Amendment to Facility Operating License
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-11
... FURTHER INFORMATION CONTACT: Karl Feintuch, Project Manager, Office of Nuclear Reactor Regulation, U.S... Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2013-03037 Filed 2-8-13; 8:45 am] BILLING CODE... NUCLEAR REGULATORY COMMISSION [Docket No. 50-305; NRC-2013-0028] Kewaunee Power Station...
77 FR 11171 - License Renewal Application for Callaway Plant, Unit 1, Union Electric Company
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... Callaway Plant, Unit 1, Union Electric Company AGENCY: Nuclear Regulatory Commission. ACTION: Intent to prepare environmental impact statement and conduct scoping process. SUMMARY: Union Electric Company, a..., MO. The current operating license for Callaway expires on October 18, 2024. DATES: The public scoping...
AP1000{sup R} licensing and deployment in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jordan, R. P.; Russ, P. A.; Filiak, P. P.
2012-07-01
In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-20
... NUCLEAR REGULATORY COMMISSION [NRC-2010-0298; Docket No. 50-346] First Energy Nuclear Operating Company; Notice of Receipt and Availability of Application for Renewal of Davis Besse Nuclear Power Station, Unit 1, Facility Operating License No. NPF-003 for an Additional 20-Year Period The U.S. Nuclear Regulatory Commission (NRC or Commission) has...
18 CFR 5.6 - Pre-application document.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., flushing flows, reservoir operations, and flood control operations. (v) In the case of an existing licensed...) project facilities and operations, provide information on the existing environment, and existing data or... meeting and site visit required by § 5.8(b)(3)(viii). (2) Project location, facilities, and operations...
The use of NUREGs 1199 and 1200 in the Illinois LLW licensing program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klinger, J.G.; Harmon, D.F.
1991-12-31
This paper will describe how the LLW licensing staff of the Illinois Department of Nuclear Safety used NRC`s NUREG 1199, NUREG 1200, NUREG 1300 and Regulatory Guide 4.18 in its licensing program for reviewing and evaluating a LLW disposal facility license application. The paper will discuss how Illinois guidance documents were prepared based on modifications made to these NRC documents which were necessary to take into account site and facility specific considerations, as well as changes required by Illinois statutes and regulatory codes. The paper will review the recent revisions (January 1991) to NUREG 1199 and 1200 and the importancemore » of these revisions. The paper will also discuss recommended modifications to these NRC documents and provide an update on the status of the Department`s review and evaluation of an application for a license to site, construct and operate a LLW disposal facility in Illinois.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... also distributes an email notice that provides access to the document to the NRC's Office of the...) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One... the mail, or by courier, express mail, or expedited delivery service upon depositing the document with...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using... supported Technical Specification (TS) systems inoperable when the associated snubber(s) cannot perform its... allowed before declaring a TS supported system inoperable and taking its Conditions and Required Actions...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-09
... attacks up to and including the design basis cyber attack threat, thereby achieving high assurance that... provide assurance that safety-related SSCs are protected from cyber attacks. Implementation of 10 CFR 73... of ``high assurance of adequate protection against cyber attacks.'' The proposed revision would not...
76 FR 20073 - Qualification of Drivers; Exemption Applications; Diabetes Mellitus
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... does not have diabetic retinopathy. He holds a Class D operator's license from Massachusetts. Kyle T... that he does not have diabetic retinopathy. He holds a Class B Commerical Driver's License (CDL) from... examined him in 2010 and certified that he does not have diabetic retinopathy. He holds a Class A CDL from...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... SFP Purification Loop and recirculation and purification of the RWST water using the BARS is not... revise the minimum volume and low level setpoint on the Refueling Water Storage Tank. Because the... proposed change would revise Technical Specification 3.5.4, ``Refueling Water Storage Tank (RWST)'' such...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... changes to the Bases or licensee-controlled document will be evaluated pursuant to the requirements of 10... isolation, or radiological consequences of any accident previously evaluated. Further, the proposed changes...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... safety-related function of preserving containment integrity by isolation of the PSS lines penetrating... maintaining the ability of the PSS to perform its safety-related containment isolation function. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... Technical Specification (TS) 3.3.6, ``Containment Purge Isolation Instrumentation,'' such that a Note would... 3.6.3, ``Containment Isolation Valves,'' and TS 3.9.4, ``Containment Penetrations.'' Basis for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-28
... cases to mail copies on electronic storage media. Participants may not submit paper copies of their... Friday, excluding government holidays. Participants who believe that they have a good cause for not... privacy information, such as social security numbers, home addresses, or home phone numbers in their...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-21
...) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously... statement of the alleged facts or expert opinion which support the contention and on which the requestor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
...-Water Reactors] Steam Generator Tubes'' [Reference 7] and NEI [Nuclear Energy Institute] 97-06, ``Steam... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... the required structural margins of the SG tubes for both normal and accident conditions. Nuclear...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-373 and 50-374; NRC-2011-0234] Exelon Generation.... Nuclear Regulatory Commission (NRC, the Commission) has granted the request of Exelon Generation Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... NRC's Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the... Docketing of the Application, Notice of Opportunity for Hearing for Facility Operating License No. NPF-003 for an Additional 20-Year Period; Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
... Toronto Reservoir, part of the Swinging Bridge Hydroelectric Project, is located on Black Lake Creek in.... Applicant Contact: Robert A. Gates, Senior Vice President Operations, Eagle Creek RE, LLC, 65 Madison Avenue... regarding recreation activities, hours of operation and maintenance scheduling. l. Locations of the...
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRANSPORTATION LICENSING HUMAN SPACE FLIGHT REQUIREMENTS Launch and Reentry with Crew § 460.3 Applicability. (a... have flight crew on board a vehicle or proposes to employ a remote operator of a vehicle with a human... vehicle or who employs a remote operator of a vehicle with a human on board. (3) A crew member...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Applications and Licenses Earth Stations § 25.136 Licensing provisions for user transceivers in the 1.6/2.4 GHz... specified in § 25.213, earth stations operating in the 1.6/2.4 GHz and 1.5/1.6 GHz Mobile Satellite Services... aircraft unless the earth station has a direct physical connection to the aircraft cabin or cockpit...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Applications and Licenses Earth Stations § 25.136 Licensing provisions for user transceivers in the 1.6/2.4 GHz... specified in § 25.213, earth stations operating in the 1.6/2.4 GHz and 1.5/1.6 GHz Mobile Satellite Services... aircraft unless the earth station has a direct physical connection to the aircraft cabin or cockpit...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Applications and Licenses Earth Stations § 25.136 Licensing provisions for user transceivers in the 1.6/2.4 GHz... specified in § 25.213, earth stations operating in the 1.6/2.4 GHz and 1.5/1.6 GHz Mobile-Satellite Services... aircraft unless the earth station has a direct physical connection to the aircraft cabin or cockpit...
47 CFR 90.713 - Entry criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., commercial use to non-Government, Phase I applicants. Applicants for these nationwide channel blocks must... four years of the license term; i.e., that the applicant has net current assets sufficient to cover... application showing net current assets sufficient to meet estimated construction and operating costs. An...
47 CFR 101.21 - Technical content of applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.21 Technical...) [Reserved] (e) Each application in the Private Operational Fixed Point-to-Point Microwave Service and the Common Carrier Fixed Point-to-Point Microwave Service must include the following information: Applicant's...
47 CFR 101.21 - Technical content of applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.21 Technical...) [Reserved] (e) Each application in the Private Operational Fixed Point-to-Point Microwave Service and the Common Carrier Fixed Point-to-Point Microwave Service must include the following information: Applicant's...
47 CFR 101.21 - Technical content of applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.21 Technical...) [Reserved] (e) Each application in the Private Operational Fixed Point-to-Point Microwave Service and the Common Carrier Fixed Point-to-Point Microwave Service must include the following information: Applicant's...
10 CFR 55.33 - Disposition of an initial application.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Disposition of an initial application. 55.33 Section 55.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Applications § 55.33 Disposition of an initial application. (a) Requirements for the approval of an initial application. The Commission...
47 CFR 87.43 - Operation during emergency.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation during emergency. 87.43 Section 87.43 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.43 Operation during emergency. A station may be used for emergency...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... Water System, the Auxiliary Building Filtered Ventilation Exhaust System, or the Diesel Generators... nuclear service water system (NSWS) for a time period of 14 days. Basis for proposed no significant... the diesel generator buildings in the event of a leak or a break in the system piping. The probability...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-01
... sample selection. A steam generator tube rupture (SGTR) event is one of the design basis accidents that... in the design basis accident analysis. The proposed change will not cause the consequences of a SGTR... changes to the plant design basis or postulated accidents resulting from potential tube degradation. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-26
... the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will... Osmosis (RO) system borated water storage tank suction connections. Basis for proposed no significant... requirement. For the SFP, the suction to the RO system is above the required TS water level, therefore, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... Methodology for Boiling Water Reactors, June 2011. To support use of Topical Report ANP-10307PA, Revision 0... the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will... Water Reactors with AREVA Topical Report ANP- 10307PA, Revision 0, ``AREVA MCPR Safety Limit Methodology...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-13
... the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will... methodology and performance criteria for licensees to identify fire protection systems and features that are... System (ADAMS): You may access publicly-available documents online in the NRC Library at http://www.nrc...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-20
... support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using...'s Agencywide Documents Access and Management System (ADAMS): You may access publicly-available... proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-09
... system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer... Docket ID NRC-2013-0059. NRC's Agencywide Documents Access and Management System (ADAMS): You may access..., financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-19
....'' For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800...://www.nrc.gov/reading-rm/adams.html . Persons who do not have access to ADAMS or who encounter problems... basis perspective they do affect the probability that missiles generated by the winds of the tornado...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-29
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... against burst, as discussed in Regulatory Guide (RG) 1.121, ``Bases for Plugging Degraded PWR [Pressurized... Institute] 97-06, Revision 3, ``Steam Generator Program Guidelines'' (Reference 1) and RG 1.121, ``Bases for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-10
... Bases and replacing the isolation time with the phase, ``within limits.'' The proposed change does not... isolation valves are retained in the TS. Future changes to the Bases or licensee-controlled document will be... referenced in the Bases. In addition, the valve isolation times are replaced in the TS with the phase...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident... alleged facts or expert opinion which support the contention and on which the requestor/ petitioner...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
... consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of... contention and a concise statement of the alleged facts or expert opinion which support the contention and on...
47 CFR 25.262 - Licensing and domestic coordination requirements for 17/24 GHz BSS space stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... requirements for 17/24 GHz BSS space stations. 25.262 Section 25.262 Telecommunication FEDERAL COMMUNICATIONS... Licensing and domestic coordination requirements for 17/24 GHz BSS space stations. (a) Except as described in paragraphs (b), (c) or (e) of this section, applicants seeking to operate a space station in the...
47 CFR 25.262 - Licensing and domestic coordination requirements for 17/24 GHz BSS space stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... requirements for 17/24 GHz BSS space stations. 25.262 Section 25.262 Telecommunication FEDERAL COMMUNICATIONS... Licensing and domestic coordination requirements for 17/24 GHz BSS space stations. (a) Except as described in paragraphs (b), (c) or (e) of this section, applicants seeking to operate a space station in the...
47 CFR 25.262 - Licensing and domestic coordination requirements for 17/24 GHz BSS space stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... requirements for 17/24 GHz BSS space stations. 25.262 Section 25.262 Telecommunication FEDERAL COMMUNICATIONS... Licensing and domestic coordination requirements for 17/24 GHz BSS space stations. (a) Except as described in paragraphs (b), (c) or (e) of this section, applicants seeking to operate a space station in the...
47 CFR 25.262 - Licensing and domestic coordination requirements for 17/24 GHz BSS space stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... requirements for 17/24 GHz BSS space stations. 25.262 Section 25.262 Telecommunication FEDERAL COMMUNICATIONS... Licensing and domestic coordination requirements for 17/24 GHz BSS space stations. (a) Except as described in paragraphs (b), (c) or (e) of this section, applicants seeking to operate a space station in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... correlation for the General Electric Nuclear Energy advanced fuel designs (i.e., GE14 and GNF2 fuels) used at... Electric Nuclear Energy in its report, ``10 CFR 21 Reportable Condition Notification: Potential to Exceed... failure-maximum demand open (PRFO) transient as reported by General Electric Nuclear Energy in its Part 21...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... accidents are increased. Therefore, there is no undue risk to public health and safety. Plant construction... at this time. Based on the nature of the requested exemption as described above, no new accident... a license decision is made, the probability of postulated accidents is not increased. Additionally...
47 CFR 101.21 - Technical content of applications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.21 Technical... Private Operational Fixed Point-to-Point Microwave Service and the Common Carrier Fixed Point-to-Point Microwave Service must include the following information: Applicant's name and address. Transmitting station...
47 CFR 101.21 - Technical content of applications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.21 Technical... Private Operational Fixed Point-to-Point Microwave Service and the Common Carrier Fixed Point-to-Point Microwave Service must include the following information: Applicant's name and address. Transmitting station...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0275] Applications and Amendments to Facility Operating.... You may submit comments by any one of the following methods: Federal Rulemaking Web Site: Go to http... Information Comments submitted in writing or in electronic form will be posted on the NRC Web site and on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-346; NRC-2010-0121] Firstenergy Nuclear Operating Company and Firstenergy Nuclear Generation Corp.; Notice of Withdrawal of Application for Amendment to Facility Operating License The U.S. Nuclear Regulatory Commission (the Commission) has [[Page 13802
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chopra, O.K.; Diercks, D.; Fabian, R.
The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a periodmore » not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ ISFSIs are adequately managed for the period of extended operation. To date, all of the ISFSIs located across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years; three ISFSIs (Surry, H.B. Robinson and Oconee) have received their renewed licenses for 20 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. This report examines issues related to managing aging effects on the SSCs in DCSSs/ISFSIs for extended long-term storage and transportation of used fuels, following an approach similar to that of the Generic Aging Lessons Learned (GALL) report, NUREG-1801, for the aging management and license renewal of nuclear power plants. The report contains five chapters and an appendix on quality assurance for aging management programs for used-fuel dry storage systems. Chapter I of the report provides an overview of the ISFSI license renewal process based on 10 CFR 72 and the guidance provided in NUREG-1927. Chapter II contains definitions and terms for structures and components in DCSSs, materials, environments, aging effects, and aging mechanisms. Chapter III and Chapter IV contain generic TLAAs and AMPs, respectively, that have been developed for managing aging effects on the SSCs important to safety in the dry cask storage system designs described in Chapter V. The summary descriptions and tabulations of evaluations of AMPs and TLAAs for the SSCs that are important to safety in Chapter V include DCSS designs (i.e., NUHOMS{reg_sign}, HI-STORM 100, Transnuclear (TN) metal cask, NAC International S/T storage cask, ventilated storage cask (VSC-24), and the Westinghouse MC-10 metal dry storage cask) that have been and continue to be used by utilities across the country for dry storage of used fuel to date. The goal of this report is to help establish the technical basis for extended long-term storage and transportation of used fuel.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0184; Docket No. 50-482] Wolf Creek Nuclear Operating... Regulatory Commission (the Commission) has granted the request of Wolf Creek Nuclear Operating Corporation... 22, 2010, for proposed amendment to Renewed Facility Operating License No. NPF-42 for the Wolf Creek...
10 CFR 34.111 - Applications for exemptions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Applications for exemptions. 34.111 Section 34.111 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Exemptions § 34.111 Applications for exemptions. The Commission may, upon...
10 CFR 34.111 - Applications for exemptions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Applications for exemptions. 34.111 Section 34.111 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Exemptions § 34.111 Applications for exemptions. The Commission may, upon...
10 CFR 34.111 - Applications for exemptions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Applications for exemptions. 34.111 Section 34.111 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Exemptions § 34.111 Applications for exemptions. The Commission may, upon...
10 CFR 34.111 - Applications for exemptions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Applications for exemptions. 34.111 Section 34.111 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Exemptions § 34.111 Applications for exemptions. The Commission may, upon...
10 CFR 34.111 - Applications for exemptions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Applications for exemptions. 34.111 Section 34.111 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Exemptions § 34.111 Applications for exemptions. The Commission may, upon...
COL Application Content Guide for HTGRs: Revision to RG 1.206, Part 1 - Status Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wayne Moe
2012-08-01
A combined license (COL) application is required by the Nuclear Regulatory Commission (NRC) for all proposed nuclear plants. The information requirements for a COL application are set forth in 10 CFR 52.79, “Contents of Applications; Technical Information in Final Safety Analysis Report.” An applicant for a modular high temperature gas-cooled reactor (HTGR) must develop and submit for NRC review and approval a COL application which conforms to these requirements. The technical information necessary to allow NRC staff to evaluate a COL application and resolve all safety issues related to a proposed nuclear plant is detailed and comprehensive. To this, Regulatorymore » Guide (RG) 1.206, “Combined License Applications for Nuclear Power Plants” (LWR Edition), was developed to assist light water reactor (LWR) applicants in incorporating and effectively formatting required information for COL application review (Ref. 1). However, the guidance prescribed in RG 1.206 presumes a LWR design proposal consistent with the systems and functions associated with large LWR power plants currently operating under NRC license.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... SGTR accident. At normal operating pressures, leakage from primary water stress corrosion cracking... PWR [pressurized- water reactor] Operability Requirements and Actions for RCS Leakage Instrumentation... water inventory can be obtained. Therefore, it is concluded that the proposed changes do not involve a...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
...] Leakage Detection Systems,'' to define a new time limit for restoring inoperable RCS leakage detection instrumentation to operable status, establish alternate methods of monitoring RCS leakage when monitors are... design bases related to the operability of the RCS leakage detection instrumentation. Date of issuance...
Code of Federal Regulations, 2013 CFR
2013-01-01
... an application has been filed for a license authorizing operation at: (1) A thermal power level in excess of 10 megawatts; or (2) A thermal power level in excess of 1 megawatt, if the reactor is to... plant means a plant in which the following operations or activities are conducted: (1) Operations for...
Code of Federal Regulations, 2014 CFR
2014-01-01
... an application has been filed for a license authorizing operation at: (1) A thermal power level in excess of 10 megawatts; or (2) A thermal power level in excess of 1 megawatt, if the reactor is to... plant means a plant in which the following operations or activities are conducted: (1) Operations for...
47 CFR 13.7 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...
47 CFR 13.7 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...
Code of Federal Regulations, 2010 CFR
2010-10-01
... the location of the base station transmitter site of the facility for which they have applied. (2... licensed to them within 64 km (40 mi.) from the location of the base station transmitter site of the... control stations to be placed in operation within the term of the license. (c) [Reserved] (d) All...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
... on the Commission's web site at http://www.ferc.gov/docs-filing/efiling.asp . If unable to be filed... http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at... account for differences in net head resulting from operations under the new license for the project. l...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-05
.... The analyses for LSCS, Unit 2, Cycle 15 have concluded that a two-loop MCPR SL of >= 1.14, based on... safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the... has provided its analysis of the issue of no significant hazards consideration, which is presented...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... motion or other document filed in the proceeding prior to the submission of a request for hearing or... for leave to intervene, and motions for leave to file new or amended contentions that are filed after... generated from a chemical reaction of the cladding with water or steam is less than 1% times the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
... Company D/B/A/ Dominion Virginia Power and Old Dominion Electric Cooperative, North Anna Power Station... combined license (COL) application to build and operate a new reactor at its North Anna Power Station (NAPS... Combined License (COL) for North Anna Power Station, Unit 3.'' A notice of availability of the final...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... of all onsite alternating current power supplies and the other offsite electric power circuit, to... NUCLEAR REGULATORY COMMISSION [Docket Nos.: 50-275 and 50-323; NRC-2013-0100] Diablo Canyon Power... License Nos. DPR-80 and DPR-82 for the Diablo Canyon Power Plant, Units 1 and 2, located in San Luis...
14 CFR Appendix C to Part 420 - Risk Analysis
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Risk Analysis C Appendix C to Part 420... TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Pt. 420, App. C Appendix C to Part 420—Risk Analysis (a... table C-1. Table C-1 provides sources where an applicant may obtain data acceptable to the FAA. An...
47 CFR 1.10014 - What happens after officially filing my application?
Code of Federal Regulations, 2013 CFR
2013-10-01
... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...
47 CFR 1.10014 - What happens after officially filing my application?
Code of Federal Regulations, 2014 CFR
2014-10-01
... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...
47 CFR 1.10014 - What happens after officially filing my application?
Code of Federal Regulations, 2012 CFR
2012-10-01
... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...
47 CFR 25.171 - Contact information reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Reporting Requirements for Space Station Operators § 25.171 Contact information reporting requirements. If contact information filed in space station... station's current authorization file. The operator must file the updated information within 10 days. [79...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn frommore » the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.« less
DEVELOPMENT OF HFE SECTIONS OF DG-1145.
DOE Office of Scientific and Technical Information (OSTI.GOV)
HIGGINS,J.C.; OHARA, J.M.; BONGARRA, J.
2007-03-26
For the licensing of the current fleet of commercial nuclear power plants (NPPs), the Nuclear Regulatory Commission (NRC) used two key documents, NUREG-0800 and Regulatory Guide (RG) 1.70. RG 1.70 provided guidance to applicants on the contents needed in their Safety Analysis Reports (SARs) submitted as part of their application to construct or operate an NPP. NUREG-0800, the NRC Standard Review Plan (SRP), provides guidance to the NRR staff reviewers on performing their safety reviews of these applications. As part of the preparation for a new wave of improved NPP designs the NRC is in the process of updating themore » SRP and is also developing a new RG designated as draft RG or DG-1145, ''Combined License Applications for Nuclear Power Plants (LWR Edition).'' This will eventually become RG 1.206 and will take the place of RG 1.70. This will provide guidance for combined license (COL) applicants, as well as for other 10CFR Part 52 variations that are permitted.« less
47 CFR 90.129 - Supplemental information to be routinely submitted with applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Applications and... communications. (n) All applications for renewal of base/mobile station licenses by licensees who also operate... of frequencies necessary for the link(s); (3) The name and phone number of the person(s) responsible...
49 CFR 391.23 - Investigation and inquiries.
Code of Federal Regulations, 2014 CFR
2014-10-01
... paragraph from all previous employers of the applicant that employed the driver to operate a CMV within the... CMV. (2) Exception. For drivers required to have a commercial driver's license under part 383 of this... information before allowing the driver to operate a CMV: (A) The type of operation the driver self-certified...
49 CFR 391.23 - Investigation and inquiries.
Code of Federal Regulations, 2013 CFR
2013-10-01
... paragraph from all previous employers of the applicant that employed the driver to operate a CMV within the... CMV. (2) Exception. For drivers required to have a commercial driver's license under part 383 of this... information before allowing the driver to operate a CMV: (A) The type of operation the driver self-certified...
49 CFR 391.23 - Investigation and inquiries.
Code of Federal Regulations, 2012 CFR
2012-10-01
... paragraph from all previous employers of the applicant that employed the driver to operate a CMV within the... CMV. (2) Exception. For drivers required to have a commercial driver's license under part 383 of this... information before allowing the driver to operate a CMV: (A) The type of operation the driver self-certified...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
...., train separation, redundancy, and single failure). The water level on the containment floor will be... testing requirements are conducted in accordance with the McGuire Inservice Testing Program and TS 3.6.6... Condition for Operation (LCO) 3.10.1, ``Inservice Leak and Hydrostatic Testing Operation,'' and the...
Code of Federal Regulations, 2013 CFR
2013-01-01
... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...
Code of Federal Regulations, 2014 CFR
2014-01-01
... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...
47 CFR 87.87 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Classification of operator licenses and... § 87.87 Classification of operator licenses and endorsements. (a) Commercial radio operator licenses... Telecommunication Union. (b) The following licenses are issued by the Commission. International classification, if...
10 CFR 55.46 - Simulation facilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Simulation facilities. 55.46 Section 55.46 Energy NUCLEAR... Simulation facilities. (a) General. This section addresses the use of a simulation facility for the... applicants for operator and senior operator licenses. (b) Commission-approved simulation facilities and...
10 CFR 55.46 - Simulation facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Simulation facilities. 55.46 Section 55.46 Energy NUCLEAR... Simulation facilities. (a) General. This section addresses the use of a simulation facility for the... applicants for operator and senior operator licenses. (b) Commission-approved simulation facilities and...
10 CFR 55.46 - Simulation facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Simulation facilities. 55.46 Section 55.46 Energy NUCLEAR... Simulation facilities. (a) General. This section addresses the use of a simulation facility for the... applicants for operator and senior operator licenses. (b) Commission-approved simulation facilities and...
10 CFR 55.46 - Simulation facilities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Simulation facilities. 55.46 Section 55.46 Energy NUCLEAR... Simulation facilities. (a) General. This section addresses the use of a simulation facility for the... applicants for operator and senior operator licenses. (b) Commission-approved simulation facilities and...
10 CFR 55.46 - Simulation facilities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Simulation facilities. 55.46 Section 55.46 Energy NUCLEAR... Simulation facilities. (a) General. This section addresses the use of a simulation facility for the... applicants for operator and senior operator licenses. (b) Commission-approved simulation facilities and...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operate, or manufacture, a production or utilization facility (including an early site permit, combined.... (e) Filing Fees. Each application for a standard design approval or production or utilization... 50.30 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION...
47 CFR 73.7005 - Holding period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... transferred, etc.). Costs incurred in operating the station are not recoverable (e.g., rent, salaries, utilities, music licensing fees, etc.). Any successive applicants proposing to assign or transfer the...
47 CFR 13.7 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... endorsements. 13.7 Section 13.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator... are eleven types of commercial radio operator licenses, certificates and permits (licenses). The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-10
... Technical Specification (TS) 3.4.5, ``RCS Leakage Detection Instrumentation,'' consistent with the NRC... monitoring system are the only operable reactor coolant leakage detection monitoring systems. The modified... Coolant System] Leakage Instrumentation,'' Revision 3. The availability of this TS improvement was...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Applicable to Proceedings for the Issuance of Licenses for the Receipt of High-Level Radioactive Waste at a... construction authorization for a high-level radioactive waste repository at a geologic repository operations...-level radioactive waste at a geologic repository operations area under parts 60 or 63 of this chapter...
18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... applicant's operating and load characteristics; and (C) The communities served or to be served, including... the contributions from the applicant's generation, purchases, and load modification measures (such as...; and (C) If load management measures are not viewed as resources, the effects of such measures on the...
18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... applicant's operating and load characteristics; and (C) The communities served or to be served, including... the contributions from the applicant's generation, purchases, and load modification measures (such as...; and (C) If load management measures are not viewed as resources, the effects of such measures on the...
18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... applicant's operating and load characteristics; and (C) The communities served or to be served, including... the contributions from the applicant's generation, purchases, and load modification measures (such as...; and (C) If load management measures are not viewed as resources, the effects of such measures on the...
18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... applicant's operating and load characteristics; and (C) The communities served or to be served, including... the contributions from the applicant's generation, purchases, and load modification measures (such as...; and (C) If load management measures are not viewed as resources, the effects of such measures on the...
18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... applicant's operating and load characteristics; and (C) The communities served or to be served, including... the contributions from the applicant's generation, purchases, and load modification measures (such as...; and (C) If load management measures are not viewed as resources, the effects of such measures on the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... under the World Trade Organization Basic Telecommunications Agreement. (b) Earth station applicants, or... addressed in this paragraph must be filed electronically through the International Bureau Filing System...
Code of Federal Regulations, 2011 CFR
2011-10-01
... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... under the World Trade Organization Basic Telecommunications Agreement. (b) Earth station applicants, or... addressed in this paragraph must be filed electronically through the International Bureau Filing System...
Code of Federal Regulations, 2012 CFR
2012-10-01
... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... under the World Trade Organization Basic Telecommunications Agreement. (b) Earth station applicants, or... addressed in this paragraph must be filed electronically through the International Bureau Filing System...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2013 CFR
2013-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2013-01-01 2013-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2011 CFR
2011-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2011-01-01 2011-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2012 CFR
2012-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2012-01-01 2012-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2014 CFR
2014-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2014-01-01 2014-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2010-01-01 2010-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-12
... Operations, Kaukauna Utilities, 777 Island Street, Kaukauna, WI 54130; phone: (920) 462-0220; email: wi.org ">[email protected] wi.org . i. FERC Contact: Isis Johnson at (202) 502-6346; or email at isis.johnson@ferc.gov...
Dynamic Spectrum Access for Internet of Things Service in Cognitive Radio-Enabled LPWANs
Moon, Bongkyo
2017-01-01
In this paper, we focus on a dynamic spectrum access strategy for Internet of Things (IoT) applications in two types of radio systems: cellular networks and cognitive radio-enabled low power wide area networks (CR-LPWANs). The spectrum channel contention between the licensed cellular networks and the unlicensed CR-LPWANs, which work with them, only takes place within the cellular radio spectrum range. Our aim is to maximize the spectrum capacity for the unlicensed users while ensuring that it never interferes with the licensed network. Therefore, in this paper we propose a dynamic spectrum access strategy for CR-LPWANs operating in both licensed and unlicensed bands. The simulation and the numerical analysis by using a matrix geometric approach for the strategy are presented. Finally, we obtain the blocking probability of the licensed users, the mean dwell time of the unlicensed user, and the total carried traffic and combined service quality for the licensed and unlicensed users. The results show that the proposed strategy can maximize the spectrum capacity for the unlicensed users using IoT applications as well as keep the service quality of the licensed users independent of them. PMID:29206215
Dynamic Spectrum Access for Internet of Things Service in Cognitive Radio-Enabled LPWANs.
Moon, Bongkyo
2017-12-05
In this paper, we focus on a dynamic spectrum access strategy for Internet of Things (IoT) applications in two types of radio systems: cellular networks and cognitive radio-enabled low power wide area networks (CR-LPWANs). The spectrum channel contention between the licensed cellular networks and the unlicensed CR-LPWANs, which work with them, only takes place within the cellular radio spectrum range. Our aim is to maximize the spectrum capacity for the unlicensed users while ensuring that it never interferes with the licensed network. Therefore, in this paper we propose a dynamic spectrum access strategy for CR-LPWANs operating in both licensed and unlicensed bands. The simulation and the numerical analysis by using a matrix geometric approach for the strategy are presented. Finally, we obtain the blocking probability of the licensed users, the mean dwell time of the unlicensed user, and the total carried traffic and combined service quality for the licensed and unlicensed users. The results show that the proposed strategy can maximize the spectrum capacity for the unlicensed users using IoT applications as well as keep the service quality of the licensed users independent of them.
NASA Technical Reports Server (NTRS)
Buden, D.
1991-01-01
Topics dealing with nuclear safety are addressed which include the following: general safety requirements; safety design requirements; terrestrial safety; SP-100 Flight System key safety requirements; potential mission accidents and hazards; key safety features; ground operations; launch operations; flight operations; disposal; safety concerns; licensing; the nuclear engine for rocket vehicle application (NERVA) design philosophy; the NERVA flight safety program; and the NERVA safety plan.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... level be raised to support SSF RC Makeup System operability. Thus, the SFP water level will not be..., but should note that the NRC's E-Filing system does not support unlisted software, and the NRC Meta... a reverse osmosis system during normal plant operation to remove silica from borated water storage...
47 CFR 13.7 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Classification of operator licenses and... OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator... license's ITU classification, if different from its name, is given in parentheses. (1) First Class...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-03
... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...
47 CFR 1.85 - Suspension of operator licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... license is ordered suspended, the operator shall send his operator license to the Licensing and Technical Analysis Branch, Public Safety and Private Wireless Division, Wireless Telecommunications Bureau, in...
47 CFR 1.85 - Suspension of operator licenses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... license is ordered suspended, the operator shall send his operator license to the Licensing and Technical Analysis Branch, Public Safety and Private Wireless Division, Wireless Telecommunications Bureau, in...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
... Generator Water Level High-High'' instrument setpoint and associated allowable value. The proposed change is... [Pressurized-Water Reactor] PWR Operability Requirements and Actions for RCS Leakage Instrumentation''. Basis... monitor is the containment atmospheric gaseous radiation monitor. The monitoring of RCS leakage is not a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-11
... tubesheet in that region. At normal operating pressures, leakage from primary water stress corrosion... cause failure. The EDG reliability will thereby be potentially increased by reducing the stresses on the..., ``Bases for Plugging Degraded PWR [pressurized-water reactor] Steam Generator Tubes,'' margins against...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
... define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection... RCS leakage detection instrumentation. These changes are consistent with NRC-approved Revision 3 to...? Response: No. The proposed change clarifies the operability requirements for the RCS leakage detection...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-31
... detection instrumentation to operable status; establish alternate methods of monitoring RCS leakage when one... the RCS leakage detection instrumentation. These changes are consistent with NRC-approved Revision 3... requirements for the RCS leakage detection instrumentation and reduces the time allowed for the plant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-20
... designed, on an RAS. Basis for proposed no significant hazards consideration determination: As required by...], Time Response Design Criteria for Safety- Related Operator Actions, 1984 guidance. Although the change... changes to the RAS Allowable Values and RWT minimum required level on the RWT structural design...
47 CFR 74.113 - Supplementary reports with application for renewal of license.
Code of Federal Regulations, 2010 CFR
2010-10-01
... data on research and experimentation conducted including the types of transmitting and studio equipment used and their mode of operation. (3) Data on expense of research and operation during the period covered. (4) Power employed, field intensity measurements and visual and aural observations and the types...
10 CFR 2.400 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-01-01
... to construct and/or operate nuclear power reactors of identical design to be located at multiple... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.400 Section 2.400 Energy NUCLEAR...
47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.
Code of Federal Regulations, 2012 CFR
2012-10-01
... satisfactory knowledge of FCC rules and must have the ability to send correctly and receive correctly spoken...) Applicant must have one year of experience in sending and receiving public correspondence by radiotelegraph at a public coast station, a ship station, or both. (2) Second Class Radiotelegraph Operator's...
47 CFR 87.45 - Time in which station is placed in operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Time in which station is placed in operation. 87.45 Section 87.45 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.45 Time in which station is placed...
Code of Federal Regulations, 2010 CFR
2010-01-01
... November 15, 1997 through November 14, 1998, is $200 plus $100 for each branch or additional business... is $400 plus $200 dollars for each branch or additional business facility operated by the applicant... November 14, 1997, is $300 plus $150 for each branch or additional business facility operated by the...
47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... satisfactory knowledge of FCC rules and must have the ability to send correctly and receive correctly spoken...) Applicant must have one year of experience in sending and receiving public correspondence by radiotelegraph at a public coast station, a ship station, or both. (2) Second Class Radiotelegraph Operator's...
76 FR 38651 - Ocean Transportation Intermediary License; Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
.... Arabian Global Logistics Inc. dba Arabian Cargo International (OFF), 801 Dumont Street, C, South Houston...), Jose D. Salazar, Secretary, Application Type: Add NVO Service. AV Logistics, L.L.C. (NVO & OFF), 350 Corporate Way, 250, Orange Park, FL 32073. Officers: Michael Bifulco, Vice President Operations, (Qualifying...
10 CFR 39.13 - Specific licenses for well logging.
Code of Federal Regulations, 2011 CFR
2011-01-01
... applicant will use to demonstrate the logging supervisor's knowledge and understanding of and ability to... and understanding of and ability to comply with the applicant's operating and emergency procedures. (c... performing the analysis; and (3) Pertinent experience of the person who will analyze the wipe samples. ...
Automated management of radioactive sources in Saudi Arabia
NASA Astrophysics Data System (ADS)
Al-Kheliewi, Abdullah S.; Jamil, M. F.; Basar, M. R.; Tuwaili, W. R.
2014-09-01
For usage of radioactive substances, any facility has to register and take license from relevant authority of the country in which such facility is operating. In the Kingdom of Saudi Arabia (KSA), the authority for managing radioactive sources and providing licenses to organizations for its usage is the National Center of Radiation Protection (NCRP). This paper describes the system that automates registration and licensing process of the National Center of Radiation Protection. To provide 24×7 accesses to all the customers of NCRP, system is developed as web-based application that provide facility to online register, request license, renew license, check request status, view historical data and reports etc. and other features are provided as Electronic Services that would be accessible to users via internet. The system also was designed to streamline and optimize internal operations of NCRP besides providing ease of access to its customers by implementing a defined workflow through which every registration and license request will be routed. In addition to manual payment option, the system would also be integrated with SADAD (online payment system) that will avoid lengthy and cumbersome procedures associated with manual payment mechanism. Using SADAD payment option license fee could be paid through internet/ATM machine or branch of any designated bank, Payment will be instantly notified to NCRP hence delay in funds transfer and verification of invoice could be avoided, SADAD integration is discussed later in the document.
Code of Federal Regulations, 2014 CFR
2014-10-01
... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... paragraph (a) of this section must be filed electronically through the International Bureau Filing System... 47 Telecommunication 2 2014-10-01 2014-10-01 false Application requirements for earth stations...
Code of Federal Regulations, 2013 CFR
2013-10-01
... communications with the U.S. earth station will originate or terminate. The applicant bears the burden of showing... paragraph (a) of this section must be filed electronically through the International Bureau Filing System... 47 Telecommunication 2 2013-10-01 2013-10-01 false Application requirements for earth stations...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
..., respectively, the requirements of TS 5.2.2.f: (1) ensure that operations management maintains in-depth, plant... regulations in Title 10 of the Code of Federal Regulations (10 CFR) 50.92, this means that operation of the... Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www...
78 FR 7819 - Request to Amend a License to Import
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
... 10 CFR 110.70 (b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear... Country; from application no.; docket No. Eastern Technologies, Inc.; Class A radioactive Up to a maximum... Mexico. Following nuclear power plant processing at operations and Eastern maintenance). The Technologies...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... or asked to report: Licensees and applicants for nuclear power plants and research and test... detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities...
45 CFR 98.40 - Compliance with applicable State and local regulatory requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND Program Operations (Child Care Services)-Lead Agency and Provider... shall: (1) Certify that they have in effect licensing requirements applicable to child care services... requirements on child care providers of services for which assistance is provided under the CCDF than the...
45 CFR 98.40 - Compliance with applicable State and local regulatory requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND Program Operations (Child Care Services)-Lead Agency and Provider... shall: (1) Certify that they have in effect licensing requirements applicable to child care services... requirements on child care providers of services for which assistance is provided under the CCDF than the...
45 CFR 98.40 - Compliance with applicable State and local regulatory requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND Program Operations (Child Care Services)-Lead Agency and Provider... shall: (1) Certify that they have in effect licensing requirements applicable to child care services... requirements on child care providers of services for which assistance is provided under the CCDF than the...
45 CFR 98.40 - Compliance with applicable State and local regulatory requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND Program Operations (Child Care Services)-Lead Agency and Provider... shall: (1) Certify that they have in effect licensing requirements applicable to child care services... requirements on child care providers of services for which assistance is provided under the CCDF than the...
45 CFR 98.40 - Compliance with applicable State and local regulatory requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND Program Operations (Child Care Services)-Lead Agency and Provider... shall: (1) Certify that they have in effect licensing requirements applicable to child care services... requirements on child care providers of services for which assistance is provided under the CCDF than the...
78 FR 8417 - 2006 Biennial Regulatory Review-Revision of the Commission's Rules
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
...-geostationary-orbit FSS space stations operating in the 10.7-14.5 GHz band. Specifically, we amend references to... authorizations. * * * * * (d) * * * (12) Applications for authorizations in the non-geostationary satellite orbit... Licensing provisions for the non-voice, non-geostationary Mobile-Satellite Service. (a) * * * (2) Applicants...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false How to apply. 55.31 Section 55.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Applications § 55.31 How to apply. (a) The applicant... writing the Office of Information Services, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001...
10 CFR 39.13 - Specific licenses for well logging.
Code of Federal Regulations, 2013 CFR
2013-01-01
... applicant will use to demonstrate the logging supervisor's knowledge and understanding of and ability to... and understanding of and ability to comply with the applicant's operating and emergency procedures. (c... performing the analysis; and (3) Pertinent experience of the person who will analyze the wipe samples. [52 FR...
10 CFR 39.13 - Specific licenses for well logging.
Code of Federal Regulations, 2012 CFR
2012-01-01
... applicant will use to demonstrate the logging supervisor's knowledge and understanding of and ability to... and understanding of and ability to comply with the applicant's operating and emergency procedures. (c... performing the analysis; and (3) Pertinent experience of the person who will analyze the wipe samples. [52 FR...
10 CFR 39.13 - Specific licenses for well logging.
Code of Federal Regulations, 2014 CFR
2014-01-01
... applicant will use to demonstrate the logging supervisor's knowledge and understanding of and ability to... and understanding of and ability to comply with the applicant's operating and emergency procedures. (c... performing the analysis; and (3) Pertinent experience of the person who will analyze the wipe samples. [52 FR...
15 CFR 970.206 - Statement of ownership.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Applications Contents § 970... the applicant is a United States citizen, as required by § 970.103(b)(6), and as defined in § 970.101... United States citizen responsible for exploration operations to whom notices and orders are to be...
47 CFR 87.215 - Supplemental eligibility.
Code of Federal Regulations, 2011 CFR
2011-10-01
... nongovernmental organizations (NGOs) that are authorized to apply for the license by a State or local government... NGOs must be accompanied by a new, written certification of support (for the NGO applicant to operate...
10 CFR 2.1020 - Entry upon land for inspection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ORDERS Procedures Applicable to Proceedings for the Issuance of Licenses for the Receipt of High-Level..., photographing, testing, or sampling the property or any designated object or operation thereon, within the scope...
10 CFR 2.1020 - Entry upon land for inspection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ORDERS Procedures Applicable to Proceedings for the Issuance of Licenses for the Receipt of High-Level..., photographing, testing, or sampling the property or any designated object or operation thereon, within the scope...
14 CFR 420.45 - Transfer of a license to operate a launch site.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...
14 CFR 420.45 - Transfer of a license to operate a launch site.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...
75 FR 28001 - Ken Willis; Notice of Authorization for Continued Project Operation
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
..., licensee for the Fire Mountain Lodge Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission's regulations thereunder. The Fire Mountain Lodge..., notice is hereby given that Ken Willis is authorized to continue operation of the Fire Mountain Lodge...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
..., possessing German CDLs, to operate commercial motor vehicles (CMVs) in the United States without a CDL issued... renewal of its current exemption permitting 22 named drivers, employed by Rotel and possessing German CDLs..., Tittling) and possessing German CDLs, to operate commercial motor vehicles (CMVs) in the United States...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-23
... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... New analysis limit 10 CFR 50.67 limit EAB 4.56 rem TEDE Main steam line isolation. Closing the pressurizer power-operated relief valves block valves. Securing all reactor coolant pumps. Feedwater isolation...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
... the Region I fuel storage racks reflect credit for fuel assembly burnup and soluble boron. Based on... boron concentration of 850 parts per million (ppm) during normal operations, and 1350 ppm during...) racks when considering the presence of soluble boron in the pool water for criticality control and the...
47 CFR 25.220 - Non-conforming transmit/receive earth station operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... earth station operations. (a)(1) The requirements in this section apply to earth station applications of... analog video earth stations that are ineligible for routine licensing under § 25.211(d). (2) The... submit the certifications listed in paragraphs (d)(1)(i) through (d)(1)(iv) of this section. The...
75 FR 47312 - Seminole Tribe of Florida Alcohol Beverage Control Act of 2009
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-05
... to issue licenses to all businesses that intend to sell liquor and it requires proof that the... will have operational control over the day to day operations of the applicant's business. 207. ``Sale... business entity or organization. Section III. Powers of Enforcement. 301. Powers and Duties Tribal Council...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
...; Notice of Issuance of Renewed Facility Operating License No. R-76 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance of renewed facility operating license No. R- 76. ADDRESSES: You can access.... Nuclear Regulatory Commission (NRC, the Commission) has issued renewed Facility Operating License No. R-76...
14 CFR 413.17 - Continuing accuracy of application; supplemental information; amendment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE APPLICATION... pending license or permit application. If at any time the information an applicant provides is no longer..., the FAA can deny the license or permit application. (b) An applicant may amend or supplement a license...
10 CFR 40.31 - Application for specific licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Application for specific licenses. 40.31 Section 40.31 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL License Applications § 40.31... application for a source material license, other than a license exempted from part 170 of this chapter, shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
... the LSCS, Cycle 15, operation. Cycle 15 will be the first cycle of operation with a mixed core... methodologies. The analyses for LSCS, Unit 1, Cycle 15 have concluded that a two-loop MCPR SL of >= 1.13, based... accident from any accident previously evaluated? Response: No. The GNF2 fuel to be used in Cycle 15 is of a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-07
... NUCLEAR REGULATORY COMMISSION [NRC-2010-0319; Docket No. 50-400] Carolina Power & Light Company; Notice of Withdrawal of Application for Amendment to Renewed Facility Operating License The U.S. Nuclear Regulatory Commission (NRC, the Commission) has granted the request of the Carolina Power & Light Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-282 and 50-306; NRC-2010-0325] Northern States Power Company--Minnesota; Notice of Withdrawal of Application for Amendment to Facility Operating License The U... Company, a Minnesota corporation (the licensee), doing business as Xcel Energy, to withdraw its January 27...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... Bar Nuclear Plant, Unit 1; Applications and Amendments to Facility Operating Licenses Involving... method for submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www... Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0109. NRC's...
76 FR 20052 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... Guide 1.149, ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License..., ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License Examinations, and... simulation facility for use in operator and senior operator training, license examination operating tests...
47 CFR 80.151 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Classification of operator licenses and... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of... following licenses are issued by the Commission. International classification, if different from the license...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Expiration. 55.55 Section 55.55 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Licenses § 55.55 Expiration. (a) Each operator license and senior operator license expires six years after the date of issuance, upon termination of employment with the...
14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...
14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...
14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...
14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...
14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... REUSABLE LAUNCH VEHICLE (RLV) Post-Licensing Requirements-Reusable Launch Vehicle Mission License Terms and...
21 CFR 515.10 - Medicated feed mill license applications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Medicated feed mill license applications. 515.10... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.10 Medicated feed mill license applications. (a) Medicated feed mill license applications (Forms FDA 3448) may...
10 CFR 70.81 - Modification and revocation of licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... application, or for failure to construct or operate a facility in accordance with the terms of the... extreme importance to the national defense or security, or to the health and safety of the public, the...
77 FR 14445 - Application for a License To Export Steel Forging
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
...) 415-1677, to request a digital ID certificate and allow for the creation of an electronic docket. In...Energy Nuclear Operating Co Reactor vessel One The reactor vessel Spain. December 15, 2011 head steel...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... perform a probabilistic risk evaluation using the guidance contained in NRC approved NEI [Nuclear Energy... Issue Summary 2003-18, Supplement 2, ``Use of Nuclear Energy Institute (NEI) 99-01, Methodology for...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-29
...,'' Revision 2, and Nuclear Energy [Institute] (NEI) 00- 01, ``Guidance for Post-Fire Safe-Shutdown Circuit... environmental impact statement or environmental assessment need be prepared for these amendments. If the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... guidance of Nuclear Energy Institute (NEI) 04-10, ``Risk-Informed Technical Specifications Initiative 5b...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... environmental impact statement or environmental assessment need be prepared for these amendments. If the... provisions of the NRC-approved CSP. The proposed change is consistent with Nuclear Energy Institute (NEI) 08...
34 CFR 395.9 - The setting aside of funds by the State licensing agency.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation of the vending facilities and, to the extent applicable, from vending machine income under § 395.8... (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY...
49 CFR 383.73 - State procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS COMMERCIAL DRIVER'S LICENSE..., or if the applicant has been disqualified from operating a commercial motor vehicle; (iii) A check...
Automated management of radioactive sources in Saudi Arabia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Kheliewi, Abdullah S.; Jamil, M. F.; Basar, M. R.
2014-09-30
For usage of radioactive substances, any facility has to register and take license from relevant authority of the country in which such facility is operating. In the Kingdom of Saudi Arabia (KSA), the authority for managing radioactive sources and providing licenses to organizations for its usage is the National Center of Radiation Protection (NCRP). This paper describes the system that automates registration and licensing process of the National Center of Radiation Protection. To provide 24×7 accesses to all the customers of NCRP, system is developed as web-based application that provide facility to online register, request license, renew license, check requestmore » status, view historical data and reports etc. and other features are provided as Electronic Services that would be accessible to users via internet. The system also was designed to streamline and optimize internal operations of NCRP besides providing ease of access to its customers by implementing a defined workflow through which every registration and license request will be routed. In addition to manual payment option, the system would also be integrated with SADAD (online payment system) that will avoid lengthy and cumbersome procedures associated with manual payment mechanism. Using SADAD payment option license fee could be paid through internet/ATM machine or branch of any designated bank, Payment will be instantly notified to NCRP hence delay in funds transfer and verification of invoice could be avoided, SADAD integration is discussed later in the document.« less
47 CFR 13.7 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Classification of operator licenses and endorsements. 13.7 Section 13.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.7 Classification of operator licenses and endorsements. (a) Commercial radio operator...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... a level of > 22 inches water column in support of SGIG system operation. Exelon is submitting this... site, but should note that the NRC's E-Filing system does not support unlisted software, and the NRC... EDGs and the associated support systems, such as the fuel oil storage and transfer systems, are...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
..., but should note that the NRC's E-Filing system does not support unlisted software, and the NRC Meta... support the physical fuel change. These methodologies do not use the total planar radial peaking factor (F... systems performance, operating mode and equipment out of service. The proposed change is supported by GEH...
78 FR 16490 - Placer County Water Agency; Notice of Authorization for Continued Project Operation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2079-000] Placer County Water Agency; Notice of Authorization for Continued Project Operation On February 23, 2011, the Placer County Water Agency, licensee for the Middle Fork American River Hydroelectric Project, filed an Application for a New License pursuant to the Federa...
47 CFR 74.602 - Frequency assignment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... segments 17,700-18,580 and 19,260-19,700 MHz are available for broadcast auxiliary stations as described in... operating on frequencies in the sub-bands 18.3-18.58 GHz and 19.26-19.3 GHz that were licensed or had applications pending before the Commission as of September 18, 1998 may continue those operations on a shared...
47 CFR 74.602 - Frequency assignment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... segments 17,700-18,580 and 19,260-19,700 MHz are available for broadcast auxiliary stations as described in... operating on frequencies in the sub-bands 18.3-18.58 GHz and 19.26-19.3 GHz that were licensed or had applications pending before the Commission as of September 18, 1998 may continue those operations on a shared...
Chapter 5, "License Renewal and Aging Management for Continued Service
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naus, Dan J
As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of themore » license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.« less
47 CFR 80.55 - Application for a fleet station license.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Application for a fleet station license. 80.55... SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.55 Application for a fleet station license. (a) An applicant may apply for licenses for two or more radiotelephone stations aboard...
47 CFR 80.55 - Application for a fleet station license.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Application for a fleet station license. 80.55... SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.55 Application for a fleet station license. (a) An applicant may apply for licenses for two or more radiotelephone stations aboard...
47 CFR 80.55 - Application for a fleet station license.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Application for a fleet station license. 80.55... SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.55 Application for a fleet station license. (a) An applicant may apply for licenses for two or more radiotelephone stations aboard...
47 CFR 80.55 - Application for a fleet station license.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a fleet station license. 80.55... SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.55 Application for a fleet station license. (a) An applicant may apply for licenses for two or more radiotelephone stations aboard...
47 CFR 80.55 - Application for a fleet station license.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Application for a fleet station license. 80.55... SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.55 Application for a fleet station license. (a) An applicant may apply for licenses for two or more radiotelephone stations aboard...
47 CFR 97.9 - Operator license grant.
Code of Federal Regulations, 2010 CFR
2010-10-01
... grants are: Novice, Technician, Technician Plus (until such licenses expire, a Technical Class license granted before February 14, 1991, is considered a Technician Plus Class license), General, Advanced, and... grant. (b) The person named in an operator license grant of Novice, Technician, Technician Plus, General...
9 CFR 102.3 - License applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PRODUCTS § 102.3 License applications. (a) U.S. Veterinary Biologics Establishment License. (1) The... Plant Health Inspection Service. (5) Each application for a U.S. Veterinary Biologics Establishment License shall be accompanied by an application for one or more U.S. Veterinary Biological Product Licenses...
9 CFR 102.3 - License applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PRODUCTS § 102.3 License applications. (a) U.S. Veterinary Biologics Establishment License. (1) The... Plant Health Inspection Service. (5) Each application for a U.S. Veterinary Biologics Establishment License shall be accompanied by an application for one or more U.S. Veterinary Biological Product Licenses...
18 CFR 5.16 - Preliminary licensing proposal.
Code of Federal Regulations, 2012 CFR
2012-04-01
... proposal; and (3) Include the potential applicant's draft environmental analysis by resource area of the... draft license application which includes the contents of a license application required by § 5.18 instead of the Preliminary Licensing Proposal. A potential applicant that elects to file a draft license...
77 FR 38141 - Proposed Collection; Comment Request for Electronic License Application Form
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
...-0170. Abstract: Transactions prohibited pursuant to the Trading With the Enemy Act, 50 U.S.C. App. 1-44... (e) estimates of capital or start- up costs and costs of operation, maintenance, and purchase of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-07
... with the implementation of Nuclear Energy Institute (NEI) 04-10, ``Risk-Informed Technical... approved NEI 04-10, Rev. 1 in accordance with the TS SFCP. NEI [Nuclear Energy Institute] 04-10, Rev. 1...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
... decrease the probability that a fire-induced hot short will cause equipment malfunctions. The current...-stamps the document and sends the submitter an email notice confirming receipt of the document. The E...
47 CFR 13.5 - Licensed commercial radio operator required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Licensed commercial radio operator required. 13.5 Section 13.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.5 Licensed commercial radio operator required. Rules that require FCC station...
47 CFR 13.211 - Commercial radio operator license examination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commercial radio operator license examination. 13.211 Section 13.211 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.211 Commercial radio operator license examination. (a) Each session where...
47 CFR 13.5 - Licensed commercial radio operator required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Licensed commercial radio operator required. 13.5 Section 13.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.5 Licensed commercial radio operator required. Rules that require FCC station...
The FAA's Approach to Quality Assurance in the Flight Safety Analysis of Launch and Reentry Vehicles
NASA Astrophysics Data System (ADS)
Murray, Daniel P.; Weil, Andre
2010-09-01
The U.S. Federal Aviation Administration(FAA) Office of Commercial Space Transportation’s safety mission is to ensure protection of the public, property, and the national security and foreign policy interests of the United States during commercial launch and reentry activities. As part of this mission, the FAA issues licenses to the operators of launch and reentry vehicles who successfully demonstrate compliance with FAA regulations. To meet these regulations, vehicle operators submit an application that contains, among other things, flight safety analyses of their proposed missions. In the process of evaluating these submitted analyses, the FAA often conducts its own independent analyses, using input data from the submitted license application. These analyses are conducted according to approved procedures using industry developed tools. To assist in achieving the highest levels of quality in these independent analyses, the FAA has developed a quality assurance program that consists of multiple levels of review. These reviews rely on the work of multiple teams, as well as additional, independently performed work of support contractors. This paper describes the FAA’s quality assurance process for flight safety analyses. Members of the commercial space industry may find that elements of this process can be easily applied to their own analyses, improving the quality of the material they submit to the FAA in their license applications.
14 CFR 417.11 - Continuing accuracy of license application; application for modification of license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 417.11 Section 417.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY General and...
14 CFR 417.11 - Continuing accuracy of license application; application for modification of license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Continuing accuracy of license application; application for modification of license. 417.11 Section 417.11 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY General and...
33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.
Code of Federal Regulations, 2010 CFR
2010-07-01
... directing studies to be made. In the case of an application for permit or license for an unconstructed... required to insure coordination of the applicant's studies with the Division or District Engineer in cases... studies, will when requested by the Chief of Engineers submit an estimate of the cost of the investigation...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-269, 50-270, and 50-287; NRC-2012-0093] Duke Energy Carolinas, LLC; Notice of Withdrawal of Application for Amendment to Facility Operating License The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Duke Energy Carolinas, LLC (the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... for the applicable TS 3.8.1 surveillances governing the Emergency Diesel Generators (EDGs). Basis for... the Emergency Diesel Generators. The maximum EDG output voltage of 4580 volts is not affected by this... (SR) 3.8.1.10 for the Diesel Generator endurance surveillance test. The proposed change will also...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
....5 feet from the normal reservoir elevation of 1177.0 feet on December 17, 2012. The applicant proposes to maintain the elevation within 0.25 feet of 1175.5 feet under normal operations until spillway repairs are completed, and the reservoir is refilled. As currently planned, the reservoir will be refilled...
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Assignments or transfers (all services) Corres & 159 1,015.00 CUT 3. Fixed Satellite Transmit/Receive Earth... 175.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less operating in the 4/6... Only Earth Stations: a. Initial Applications for Registration or License (per station) 312 Main...
10 CFR 55.3 - License requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false License requirements. 55.3 Section 55.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.3 License requirements. A person must be authorized by a license issued by the Commission to perform the function of an operator or...
10 CFR 55.3 - License requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false License requirements. 55.3 Section 55.3 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.3 License requirements. A person must be authorized by a license issued by the Commission to perform the function of an operator or...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-14
... of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant... (NRC or the Commission) is considering issuance of an amendment to Facility Operating License No. DPR... (SSC) or change the way any SSC is operated. The proposed license condition does not involve operation...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant... (NRC, the Commission) is considering issuance of an amendment to Facility Operating License No. DPR-20... PNP Renewed Facility Operating License. The change would remove the name of the former operator of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
.../petitioner shall provide a brief explanation of the bases for the contention and a concise statement of the...? Response: No. The Bases of TS 3.6.2.2 state that the operability of the Spray Additive System ensures that... ``Scram Discharge Volume (SDV) Vent and Drain Valves'' and associated Bases of NUREG-1433, Revision 3...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... NUCLEAR REGULATORY COMMISSION [DOCKET NO. 52-016; NRC-2008-0250] Calvert Cliffs 3 Nuclear Project, LLC and Unistar Nuclear Operating Services, LLC; Notice of Availability of the Final Environmental Impact Statement for the Combined License Application for Calvert Cliffs Nuclear Power Plant Unit 3 Notice is hereby given that the U.S. Nuclear...
Code of Federal Regulations, 2011 CFR
2011-10-01
...) [Reserved] (b) A license to operate a conventional or trunked radio system may not be assigned or... new system or to an existing licensee that has loaded its system to 70 mobiles per channel and is... combined with an existing SMR system above 800 MHz authorized to operate in the trunked mode by assignment...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... Company, Mail Code A221, 220 Operation Way, Cayce, South Carolina 29033-3701. Tel: (803) 217-9162. i. FERC... withdrawal from, and discharge to, the Project's Monticello and Parr reservoirs to serve the construction and operation needs of two new nuclear generating plants at the V.C. Summer Nuclear Station. To facilitate this...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-000] FirstLight Hydro...Light Hydro Generating Company, licensee for the Scotland Hydroelectric Project, filed an Application... license for Project No. 2662 [[Page 56638
75 FR 17743 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
..., Managing Member. Integres Global Logistics, Inc., 10995 Gold Center Drive, Suite 120, Rancho Cordova, CA..., DC 20573. Non-Vessel-Operating Common Carrier--Ocean Transportation Intermediary: HPK Logistics (USA... (Qualifying Individual) Jian Sun, President. Cargo Logistics International, LLC, 8761 Dorchester Road, Suite...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-09
... (NRC) Regulatory Issue Summary 2003-18 Supplement 2, ``Use of Nuclear Energy Institute (NEI) 99-01... with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... Filled,'' and TS 3.9.5, ``Decay Heat Removal (DHR) and Coolant Circulation--Low Water Level,'' to permit...-approved Dominion Fleet Report DOM-NAF-2- A, ``Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer...
47 CFR 13.11 - Holding more than one commercial radio operator license.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Holding more than one commercial radio operator license. 13.11 Section 13.11 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.11 Holding more than one commercial radio operator license. (a) An eligible person...
47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Qualifying for a commercial operator license or endorsement. 13.201 Section 13.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.201 Qualifying for a commercial operator license or endorsement...
77 FR 61513 - Voluntary Licensing of Amateur Rocket Operations; Correction; Delay of Effective Date
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
...-0318; Notice No. 400-4] RIN 2120-AK16 Voluntary Licensing of Amateur Rocket Operations; Correction... allow launch operators that conduct certain amateur rocket launches an opportunity to voluntarily apply... final rule entitled, ``Voluntary Licensing of Amateur Rocket Operations'' (77 FR 50584). In this rule...
14 CFR 415.63 - Incorporation of payload determination in license application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... license application. 415.63 Section 415.63 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Payload Review and Determination § 415.63 Incorporation of payload determination in license application. A favorable payload...
14 CFR 415.63 - Incorporation of payload determination in license application.
Code of Federal Regulations, 2011 CFR
2011-01-01
... license application. 415.63 Section 415.63 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Payload Review and Determination § 415.63 Incorporation of payload determination in license application. A favorable payload...
Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne L.
This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less
Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne Leland
This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false License term. 13.15 Section 13.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.15 License term. (a) First Class Radiotelegraph Operator's Certificates, Second Class Radiotelegraph Operator's...
14 CFR 413.21 - Denial of a license application.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Denial of a license application. 413.21 Section 413.21 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE APPLICATION PROCEDURES § 413.21 Denial of a license...
14 CFR 413.21 - Denial of a license application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Denial of a license application. 413.21 Section 413.21 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE APPLICATION PROCEDURES § 413.21 Denial of a license...
Code of Federal Regulations, 2011 CFR
2011-01-01
... and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and Conditions § 420.43 Duration. A license to operate a launch site remains in effect for five years from the date of issuance unless...
Code of Federal Regulations, 2010 CFR
2010-01-01
... and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and Conditions § 420.43 Duration. A license to operate a launch site remains in effect for five years from the date of issuance unless...
10 CFR 54.7 - Written communications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Written communications. 54.7 Section 54.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) REQUIREMENTS FOR RENEWAL OF OPERATING LICENSES FOR NUCLEAR POWER PLANTS General Provisions § 54.7 Written communications. All applications, correspondence, reports, and other...
10 CFR 54.7 - Written communications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Written communications. 54.7 Section 54.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) REQUIREMENTS FOR RENEWAL OF OPERATING LICENSES FOR NUCLEAR POWER PLANTS General Provisions § 54.7 Written communications. All applications, correspondence, reports, and other...
47 CFR 101.1 - Scope and authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...
47 CFR 101.1 - Scope and authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...
47 CFR 101.1 - Scope and authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...
47 CFR 101.1 - Scope and authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...
47 CFR 101.1 - Scope and authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...
Code of Federal Regulations, 2010 CFR
2010-04-01
... medicated feed mill license application or suspending or revoking a license. 515.25 Section 515.25 Food and..., FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.25 Revocation of order refusing to approve a medicated feed mill license application or suspending or revoking a...
47 CFR 87.47 - Application for a portable aircraft station license.
Code of Federal Regulations, 2011 CFR
2011-10-01
... license. 87.47 Section 87.47 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.47 Application for a portable aircraft station license. A person may apply for a portable aircraft radio station license if the need...
10 CFR 33.16 - Application for other specific licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
....16 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.16 Application for other specific licenses. An application filed pursuant to part 30 of this chapter for a specific license other than one of broad scope will be...
10 CFR 33.16 - Application for other specific licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
....16 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.16 Application for other specific licenses. An application filed pursuant to part 30 of this chapter for a specific license other than one of broad scope will be...
10 CFR 33.16 - Application for other specific licenses.
Code of Federal Regulations, 2013 CFR
2013-01-01
....16 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.16 Application for other specific licenses. An application filed pursuant to part 30 of this chapter for a specific license other than one of broad scope will be...
10 CFR 33.16 - Application for other specific licenses.
Code of Federal Regulations, 2012 CFR
2012-01-01
....16 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.16 Application for other specific licenses. An application filed pursuant to part 30 of this chapter for a specific license other than one of broad scope will be...
10 CFR 33.16 - Application for other specific licenses.
Code of Federal Regulations, 2014 CFR
2014-01-01
....16 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.16 Application for other specific licenses. An application filed pursuant to part 30 of this chapter for a specific license other than one of broad scope will be...
47 CFR 97.505 - Element credit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... but within the grace period for renewal) FCC-granted Technician or Technician Plus Class operator (including a Technician Class operator license granted before February 14, 1991) license grant: Element 2. (4) An expired FCC-issued Technician Class operator license document granted before March 21, 1987...
78 FR 37540 - Ocean Transportation Intermediary License Applicants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... Member, Application Type: New NVO & OFF License. Shiner Electrical Trading Company, LLC. (OFF), 391... Canate, Managing Member, Application Type: New NVO & OFF License. Allyn International Services, Inc. (OFF... Trevett, CEO, Application Type: New OFF License. A-Logixtic Group, LLC (NVO), 600 Kenrick Drive, C-16...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.3 Definitions. The definitions of terms used in part 13 are: (a) COLEM. Commercial operator license examination manager. (b) Commercial radio operator. A person holding a license or licenses specified in § 13.7(b). (c...
10 CFR 33.12 - Applications for specific licenses of broad scope.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Applications for specific licenses of broad scope. 33.12 Section 33.12 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.12 Applications for specific licenses of broad scope. A...
10 CFR 33.12 - Applications for specific licenses of broad scope.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Applications for specific licenses of broad scope. 33.12 Section 33.12 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.12 Applications for specific licenses of broad scope. A...
10 CFR 33.12 - Applications for specific licenses of broad scope.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Applications for specific licenses of broad scope. 33.12 Section 33.12 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.12 Applications for specific licenses of broad scope. A...
10 CFR 33.12 - Applications for specific licenses of broad scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Applications for specific licenses of broad scope. 33.12 Section 33.12 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.12 Applications for specific licenses of broad scope. A...
10 CFR 33.12 - Applications for specific licenses of broad scope.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Applications for specific licenses of broad scope. 33.12 Section 33.12 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.12 Applications for specific licenses of broad scope. A...
42 CFR 482.51 - Condition of participation: Surgical services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... applicable State laws and approved medical staff policies and procedures, LPNs and surgical technologists may... of medicine or osteopathy. (2) Licensed practical nurses (LPNs) and surgical technologists (operating... surgical care must be designed to assure the achievement and maintenance of high standards of medical...
75 FR 9444 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-02
... applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2010-0063] Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: U.S. Nuclear Regulatory Commission (NRC). ACTION: Notice of...
47 CFR 25.173 - Results of in-orbit testing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Results of in-orbit testing. 25.173 Section 25.173 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Reporting Requirements for Space Station Operators § 25.173 Results of...
47 CFR 1.1704 - Station files.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Operations and Licensing System (COALS) § 1.1704 Station files. Applications, notifications, correspondence... 47 Telecommunication 1 2014-10-01 2014-10-01 false Station files. 1.1704 Section 1.1704... administrative data relating to each system in the Multichannel Video and Cable Television Services (MVCTS) and...
47 CFR 101.5 - Station authorization required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...
47 CFR 101.5 - Station authorization required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...
47 CFR 101.5 - Station authorization required.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...
47 CFR 101.5 - Station authorization required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...
47 CFR 101.5 - Station authorization required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-01
... (Application for Reimbursement of Licensing or Certification Test Fees) Activity: Comment Request AGENCY... information needed to determine an applicant's eligibility for reimbursement of licensing and certification.... Title: Application for Reimbursement of Licensing or Certification Test Fees, (38 U.S.C. chapters 30, 32...
Use of the Legal-Institutional Analysis Model to assess hydropower licensing negotiations
Burkardt, N.; Lamb, B.L.; Lamb, B.L.; Garcia de Jalon, D.; Sabaton, C.; Souchon, Y.; Tamai, N.; Robinette, H.R.; Waddle, T.J.; Brinson, A.
2003-01-01
In the United States, the Federal Energy Regulatory Commission (FERC) is responsible for issuing or renewing licenses for hydropower projects owned and operated by power companies. During the licensing process, these companies are required to consult with agencies and other parties that are affected by project operating regimes. Typical participants include state and federal fish and wildlife agencies, environmental interest groups, and the FERC. One of the most difficult tasks facing participants is to reach agreement about what kinds of environmental conditions should be placed on license. Researchers at the United States Geological Survey developed a model to analyze the institutional context of natural resource disputes. The Legal-Institutional Analysis Model (LIAM) is a computerized model that allows an analyst to determine the likely behavior of each organization in a conflict. The model also analyzes the types and levels of negotiating power held by each organization. Researchers at the USGS have used the model in several cases involving hydropower license applications. To use the model, they facilitate workshops for stakeholder groups in order to develop a shared understanding of the likely obstacles and opportunities for successful resolution of the issues. This allows a systematic workshop analyses to develop strategies for successful negotiations, because they are able to better understand the negotiation problem and work more effectively with both their allies and their competitors.
47 CFR 87.87 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... endorsements. 87.87 Section 87.87 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... § 87.87 Classification of operator licenses and endorsements. (a) Commercial radio operator licenses... restricted certificate) [53 FR 28940, Aug. 1, 1988, as amended at 78 FR 23158, Apr. 18, 2013] ...
47 CFR 87.87 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... endorsements. 87.87 Section 87.87 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... § 87.87 Classification of operator licenses and endorsements. (a) Commercial radio operator licenses... restricted certificate) [53 FR 28940, Aug. 1, 1988, as amended at 78 FR 23158, Apr. 18, 2013] ...
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
77 FR 20853 - Entergy Nuclear Operations, Inc.; Establishment of Atomic Safety and Licensing Board
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-06
... Operations, Inc.; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the Commission... Atomic Safety and Licensing Board (Board) is being established to preside over the following proceeding... administrative judges: Ann Marshall Young, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear...