van Delft, E A K; Schepers, T; Bonjer, H J; Kerkhoffs, G M M J; Goslings, J C; Schep, N W L
2018-04-01
Safety in the operating room is widely debated. Adverse events during surgery are potentially dangerous for the patient and staff. The incidence of adverse events during orthopedic trauma surgery is unknown. Therefore, we performed a study to quantify the incidence of these adverse events. Primary objective was to determine the incidence of adverse events related to technical equipment and logistics. The secondary objective was to evaluate the consequences of these adverse events. We completed a cross-sectional observational study to assess the incidence, consequences and preventability of adverse events related to technical equipment and logistics during orthopedic trauma surgery. During a 10 week period, all orthopedic trauma operations were evaluated by an observer. Six types of procedures were differentiated: osteosynthesis; arthroscopy; removal of hardware; joint replacement; bone grafting and other. Adverse events were divided in six categories: staff dependent factors; patient dependent factors; anaesthesia; imaging equipment; operation room equipment and instruments and implants. Adverse events were defined as any factor affecting the surgical procedure in a negative way. Hundred-fifty operative procedures were included. In 54% of the procedures, at least one adverse event occurred. In total, 147 adverse events occurred, with a range of 1-5 per procedure. Most adverse events occurred during joint replacement procedures. Thirty-seven percent of the incidents concerned defect, incorrect connected or absent instruments. In 36% of the procedures adverse events resulted in a prolonged operation time with a median prolongation of 10.0 min. In more than half of orthopedic trauma surgical procedures adverse events related to technical equipment and logistics occurred, most of them could easily be prevented. These adverse events could endanger the safety of the patient and staff and should therefore be reduced. 4.
30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?
Code of Federal Regulations, 2010 CFR
2010-07-01
... during drilling operations? 250.408 Section 250.408 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.408 May I use alternative procedures or equipment...
49 CFR 232.609 - Handling of defective equipment with ECP brake systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and appropriate operating and inspection personnel; and (3) An electronic or written record of the... operating freight cars equipped with ECP brake systems shall adopt and comply with specific procedures... this subpart. These procedures shall be made available to FRA upon request. (2) Each railroad operating...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... procedure for commercial refrigeration equipment because the equipment cannot operate at the specified... Program for certain industrial equipment, which includes commercial refrigeration equipment, the focus of... establish and amend test procedures for commercial refrigeration equipment. (42 U.S.C. 6314(a)(6)(C)) On...
The purpose of this SOP is to describe the procedures for using and maintaining the related microcomputer equipment at the Illinois Institute of Technology (IIT)/NHEXAS site. These methods were used in all data operations and maintenance routines during the NHEXAS project and th...
30 CFR 57.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warnings prior to starting or moving equipment... NONMETAL MINES Machinery and Equipment Safety Practices and Operational Procedures § 57.14200 Warnings... equipment, equipment operators shall sound a warning that is audible above the surrounding noise level or...
30 CFR 57.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warnings prior to starting or moving equipment... NONMETAL MINES Machinery and Equipment Safety Practices and Operational Procedures § 57.14200 Warnings... equipment, equipment operators shall sound a warning that is audible above the surrounding noise level or...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus...
40 CFR 243.201-2 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... waste handling techniques, and in the proper operation of collection equipment, such as those presented in Operation Responsible: Safe Refuse Collection. (b) Personal protective equipment such as gloves... Standards for Subpart I—Personal Protective Equipment (29 CFR 1910.132 through 1910.137). (c) Scavenging...
40 CFR 243.201-2 - Recommended procedures: Operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... waste handling techniques, and in the proper operation of collection equipment, such as those presented in Operation Responsible: Safe Refuse Collection. (b) Personal protective equipment such as gloves... Standards for Subpart I—Personal Protective Equipment (29 CFR 1910.132 through 1910.137). (c) Scavenging...
The purpose of this SOP is to describe the procedures for using and maintaining the related microcomputer equipment at the Illinois Institute of Technology (IIT)/NHEXAS site. These methods were used in all data operations and maintenance routines during the Arizona NHEXAS projec...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
30 CFR 57.9316 - Notifying the equipment operator.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 57.9316 Notifying the equipment operator. When an operator of self-propelled mobile...
30 CFR 56.9316 - Notifying the equipment operator.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9316 Notifying the equipment operator. When an operator of self-propelled mobile...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2014 CFR
2014-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
Maintenance of Mechanical Equipment in Minnesota Schools, 1968 Survey.
ERIC Educational Resources Information Center
Larson, R. E.; Rust, L. W.
Results of a one-year research program to study maintenance procedures for operating mechanical equipment were based on the determination of--(1) the present condition and level of performance of operating mechanical equipment, (2) the problems encountered by school administrators and custodial engineers pertaining to operating mechanical…
Safety validation test equipment operation
NASA Astrophysics Data System (ADS)
Kurosaki, Tadaaki; Watanabe, Takashi
1992-08-01
An overview of the activities conducted on safety validation test equipment operation for materials used for NASA manned missions is presented. Safety validation tests, such as flammability, odor, offgassing, and so forth were conducted in accordance with NASA-NHB-8060.1C using test subjects common with those used by NASA, and the equipment used were qualified for their functions and performances in accordance with NASDA-CR-99124 'Safety Validation Test Qualification Procedures.' Test procedure systems were established by preparing 'Common Procedures for Safety Validation Test' as well as test procedures for flammability, offgassing, and odor tests. The test operation organization chaired by the General Manager of the Parts and Material Laboratory of NASDA (National Space Development Agency of Japan) was established, and the test leaders and operators in the organization were qualified in accordance with the specified procedures. One-hundred-one tests had been conducted so far by the Parts and Material Laboratory according to the request submitted by the manufacturers through the Space Station Group and the Safety and Product Assurance for Manned Systems Office.
47 CFR 2.915 - Grant of application.
Code of Federal Regulations, 2012 CFR
2012-10-01
... RULES AND REGULATIONS Equipment Authorization Procedures Application Procedures for Equipment... officially notice, that: (1) The equipment is capable of complying with pertinent technical standards of the rule part(s) under which it is to be operated; and, (2) A grant of the application would serve the...
47 CFR 2.915 - Grant of application.
Code of Federal Regulations, 2010 CFR
2010-10-01
... RULES AND REGULATIONS Equipment Authorization Procedures Application Procedures for Equipment... officially notice, that: (1) The equipment is capable of complying with pertinent technical standards of the rule part(s) under which it is to be operated; and, (2) A grant of the application would serve the...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
Operational Improvements From the In-Trail Procedure in the North Atlantic Organized Track System
NASA Technical Reports Server (NTRS)
Chartrand, Ryan C.; Bussink, Frank J. L.; Graff, Thomas J.; Murdoch, Jennifer L.; Jones, Kenneth M.
2008-01-01
This paper explains the computerized batch processing experiment examining the operational impacts of the introduction of Automatic Dependent Surveillance-Broadcast (ADS-B) equipment and the In-Trail Procedure (ITP) to the North Atlantic Organized Track System (NATOTS). This experiment was conducted using the Traffic Manager (TMX), a desktop simulation capable of simulating airspace environments and aircraft operations. ADS-B equipment can enable the use of new ground and airborne procedures, such as the ITP. The ITP is among the first of these new procedures, which will make use of improved situation awareness in the local surrounding airspace of ADS-B equipped aircraft to enable more efficient oceanic flight level changes. The data collected were analyzed with respect to multiple operationally relevant parameters including fuel burn, request approval rates, and the distribution of fuel savings. This experiment showed that through the use of ADS-B or ADS-B and the ITP that operational improvements and benefits could be achieved.
NASA Technical Reports Server (NTRS)
Chartrand, Ryan C.; Bussink, Frank J.; Graff, Thomas J.; Jones, Kenneth M.
2009-01-01
This paper explains the computerized batch processing experiment examining the operational impacts of the introduction of Automatic Dependent Surveillance-Broadcast (ADS-B) equipment and the In-Trail Procedure (ITP) to the North Atlantic Organized Track System. This experiment was conducted using the Traffic Manager (TMX), a desktop simulation capable of simulating airspace environments and aircraft operations. ADS-B equipment can enable the use of new ground and airborne procedures, such as the ITP. ITP is among the first of these new procedures, which will make use of improved situation awareness in the local surrounding airspace of ADS-B equipped aircraft to enable more efficient oceanic flight level changes. The collected data were analyzed with respect to multiple operationally relevant parameters including fuel burn, request approval rates, and the distribution of fuel savings. This experiment showed that through the use of ADS-B or ADS-B and the ITP that operational improvements and benefits could be achieved.
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.52 Operating procedures. (a) The... for safely conducting activities associated with each covered process consistent with the safety information for that process. Operating procedures or instructions provided by equipment manufacturers or...
Ground Software Maintenance Facility (GSMF) user's manual
NASA Technical Reports Server (NTRS)
Aquila, V.; Derrig, D.; Griffith, G.
1986-01-01
Instructions for the Ground Software Maintenance Facility (GSMF) system user is provided to operate the GSMF in all modes. The GSMF provides the resources for the Automatic Test Equipment (ATE) computer program maintenance (GCOS and GOAL). Applicable reference documents are listed. An operational overview and descriptions of the modes in terms of operator interface, options, equipment, material utilization, and operational procedures are contained. Test restart procedures are described. The GSMF documentation tree is presented including the user manual.
Suggested set-up and layout of instruments and equipment for advanced operative laparoscopy.
Winer, W K; Lyons, T L
1995-02-01
Crucial elements that ensure the organization and smoothness of a laparoscopic procedure are clear communication among well-trained endoscopy team members, properly maintained equipment, and a sensible layout of the instruments. The team consists of the surgeon, surgical assistant, circulator, scrub nurse, laser nurse, and anesthesiologist. To promote continuity and interaction and to ensure a systematic, pleasant pace for laparoscopic procedures, the team should establish a specific routine, as well as set-up and layout of tables, equipment, and instruments. Key ingredients for advanced operative laparoscopy to be performed with optimum efficiency and effectiveness are the best organization and placement of the equipment, instrumentation, and team in a particular setting in the operating room.
46 CFR 130.480 - Test procedure and operations manual.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Test procedure and operations manual. 130.480 Section... VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.480 Test procedure and operations manual. (a) A procedure for tests to be conducted on automated...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2013 CFR
2013-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
Development of Army Facility Functionality Assessment Criteria and Procedures
2010-09-01
critical facility types: the Tactical Equipment Main- tenance Facility (TEMF), the Company Operations Facility (COF), the Bat- talion Headquarters...Criteria for Company Operations Facilities (COF) ................ 56 Appendix G: Army Standard Design Criteria for Tactical Equipment Maintenance...1 mission-critical facility types: the Tactical Equipment Mainten- ance Facility (TEMF), the Company Operations Facility (COF), the Batta- lion
ERIC Educational Resources Information Center
Cuming, Richard G.
2009-01-01
Exposure to certain bloodborne pathogens can prematurely end a person's life. Healthcare workers (HCWs), especially those who are members of surgical teams, are at increased risk of exposure to these pathogens. The proper use of personal protective equipment (PPE) during operative/invasive procedures reduces that risk. Despite this, some HCWs fail…
2016-04-04
Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using...ABSTRACT This Test Operations Procedure (TOP) describes typical equipment and procedures to setup and operate a Video Target Scoring System (VTSS) to...lights. 15. SUBJECT TERMS Video Target Scoring System, VTSS, witness screens, camera, target screen, light pole 16. SECURITY
77 FR 26356 - Petition for Waiver of Compliance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-03
... Order Procedures: Railroad Track, Locomotive and Equipment; 217, Railroad Operating Rules; 218, Railroad Operating Practices; 229, Railroad Locomotive Safety Standards; 233, Signal Systems Reporting Requirements... requiring special notice for repairs. Waiver is also sought for non-I-ETMS-equipped locomotives operating in...
30 CFR 250.1913 - What criteria for operating procedures must my SEMS program meet?
Code of Federal Regulations, 2011 CFR
2011-07-01
... precautions must include control technology, personal protective equipment, and measures to be taken if...) Bypassing and flagging out-of-service equipment; (7) Safety and environmental consequences of deviating from your equipment operating limits and steps required to correct or avoid this deviation; (8) Properties...
Pollutant Assessments Group procedures manual: Volume 2, Technical procedures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
This is volume 2 of the manuals that describes the technical procedures currently in use by the Pollution Assessments Group. This manual incorporates new developments in hazardous waste assessment technology and administrative policy. Descriptions of the equipment, procedures and operations of such things as radiation detection, soil sampling, radionuclide monitoring, and equipment decontamination are included in this manual. (MB)
The purpose of this SOP is to outline procedures for the receipt of equipment and field implementation supplies at the NHEXAS Arizona research project. This procedure was followed to ensure consistent data custody, storage, transfer, and analysis of a high quality during the Ari...
Natural Bridges National Monument photovoltaic power plant operations manual
NASA Astrophysics Data System (ADS)
Coleman, S. D.
1982-02-01
After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.
US Army Test and Evaluation Command, Test Operations Procedure, Gamma Ray Source Calibration
1980-03-28
SUPPLEMENTARY NOTES Safety, HTP 6-2-507 and AMCR-385-25. Related MTP’s: 8-3-171, AD 871790, 26 May 70 Radiation Detection Equipment 8-3-172, AD 728455, 1...perienced in Radiac calibration equipment and for that reason the procedures are not step-by-step but are planned to be interpreted by the operator in...is to be used by personnel trained and ex- perienced in the use of radiac calibration equipment and radiation prin- ciples. It ognnot be interpreted
How to develop a Standard Operating Procedure for sorting unfixed cells
Schmid, Ingrid
2012-01-01
Written Standard Operating Procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. PMID:22381383
ERIC Educational Resources Information Center
Perley, Gordon F.
This is a guide for standard operating job procedures for the pump station process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up procedures, continuous routine operation procedures, and shut-down procedures. A general description of the equipment used in the process is given. Two…
Highway Maintenance Equipment Operator: Basic Core. Training Materials.
ERIC Educational Resources Information Center
Perky, Sandra Dutreau; And Others
This basic core curriculum is part of a three-part series of instructional guides designed for use in teaching a course in highway maintenance equipment operation. Addressed in the individual units of the curriculum, after an orientation unit, are safety; basic math; basic hand tools; procedures for loading. lashing, and unloading equipment;…
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
78 FR 26110 - Kicking Cars and Going Between Rolling Equipment During Flat Switching Operations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... Cars and Going Between Rolling Equipment During Flat Switching Operations AGENCY: Federal Railroad... occurred during a railroad switching operation that involved a railroad employee kicking cars and... make recommendations to railroads regarding the adoption of car-handling procedures during flat...
The purpose of this SOP is to outline procedures for the receipt of equipment and field implementation supplies for the Arizona Border Study. This procedure was followed to ensure consistent data custody, storage, transfer, and analysis of a high quality during the Arizona NHEXA...
Network Operations Support Plan for the Spot 2 mission (revision 1)
NASA Technical Reports Server (NTRS)
Werbitzky, Victor
1989-01-01
The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.
Aerial Radiological Measuring System (ARMS): systems, procedures and sensitivity (1976)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyns, P K
1976-07-01
This report describes the Aerial Radiological Measuring System (ARMS) designed and operated by EG and G, Inc., for the Energy Research and Development Administration's (ERDA) Division of Operational Safety with the cooperation of the Nuclear Regulatory Commission. Designed to rapidly survey large areas for low-level man-made radiation, the ARMS has also proven extremely useful in locating lost radioactive sources of relatively low activity. The system consists of sodium iodide scintillation detectors, data formatting and recording equipment, positioning equipment, meteorological instruments, direct readout hardware, and data analysis equipment. The instrumentation, operational procedures, data reduction techniques and system sensitivities are described, togethermore » with their applications and sample results.« less
Zimmerman, Janice L; Sprung, Charles L
2010-04-01
To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on ensuring that adequate resources are available and appropriate protocols are developed to safely perform procedures in patients with and without influenza illness. Based on a literature review and expert opinion, a Delphi process was used to define the essential topics including performing medical procedures. Key recommendations include: (1) specify high-risk procedures (aerosol generating-procedures); (2) determine if certain procedures will not be performed during a pandemic; (3) develop protocols for safe performance of high-risk procedures that include appropriateness, qualifications of personnel, site, personal protection equipment, safe technique and equipment needs; (4) ensure adequate training of personnel in high-risk procedures; (5) procedures should be performed at the bedside whenever possible; (6) ensure safe respiratory therapy practices to avoid aerosols; (7) provide safe respiratory equipment; and (8) determine criteria for cancelling and/or altering elective procedures. Judicious planning and adoption of protocols for safe performance of medical procedures are necessary to optimize outcomes during a pandemic.
A life sciences Spacelab mission simulation
NASA Technical Reports Server (NTRS)
Mason, J. A.; Musgrave, F. S.; Morrison, D. R.
1977-01-01
The paper describes the purposes of a seven-day simulated life-sciences mission conducted in a Spacelab simulator. A major objective was the evaluation of in-orbit Spacelab operations and those mission control support functions which will be required from the Payload Operations Center. Tested equipment and procedures included experiment racks, common operational research equipment, commercial off-the-shelf equipment, experiment hardware interfaces with Spacelab, experiment data handling concepts, and Spacelab trash management.
14 CFR 91.503 - Flying equipment and operating information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating the airplane: (1) Before starting engines. (2) Before takeoff. (3) Cruise. (4) Before landing. (5... instruments and controls. (3) Engine inoperative procedures. (4) Any other procedures necessary for safety. (d...
14 CFR 91.503 - Flying equipment and operating information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating the airplane: (1) Before starting engines. (2) Before takeoff. (3) Cruise. (4) Before landing. (5... instruments and controls. (3) Engine inoperative procedures. (4) Any other procedures necessary for safety. (d...
14 CFR 91.503 - Flying equipment and operating information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating the airplane: (1) Before starting engines. (2) Before takeoff. (3) Cruise. (4) Before landing. (5... instruments and controls. (3) Engine inoperative procedures. (4) Any other procedures necessary for safety. (d...
40 CFR 61.69 - Initial report.
Code of Federal Regulations, 2010 CFR
2010-07-01
... have been incorporated into the standard operating procedures for measuring or calculating the... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Vinyl Chloride § 61.69... each piece of equipment is installed and that each piece of equipment and each procedure is being used. ...
40 CFR 61.69 - Initial report.
Code of Federal Regulations, 2012 CFR
2012-07-01
... have been incorporated into the standard operating procedures for measuring or calculating the... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Vinyl Chloride § 61.69... each piece of equipment is installed and that each piece of equipment and each procedure is being used. ...
40 CFR 61.69 - Initial report.
Code of Federal Regulations, 2013 CFR
2013-07-01
... have been incorporated into the standard operating procedures for measuring or calculating the... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Vinyl Chloride § 61.69... each piece of equipment is installed and that each piece of equipment and each procedure is being used. ...
40 CFR 61.69 - Initial report.
Code of Federal Regulations, 2011 CFR
2011-07-01
... have been incorporated into the standard operating procedures for measuring or calculating the... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Vinyl Chloride § 61.69... each piece of equipment is installed and that each piece of equipment and each procedure is being used. ...
40 CFR 61.69 - Initial report.
Code of Federal Regulations, 2014 CFR
2014-07-01
... have been incorporated into the standard operating procedures for measuring or calculating the... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Vinyl Chloride § 61.69... each piece of equipment is installed and that each piece of equipment and each procedure is being used. ...
How to develop a standard operating procedure for sorting unfixed cells.
Schmid, Ingrid
2012-07-01
Written standard operating procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. Copyright © 2012 Elsevier Inc. All rights reserved.
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... definitions (42 U.S.C. 6311), energy conservation standards (42 U.S.C. 6313), test procedures (42 U.S.C. 6314... operate. DOE notes that it has published an amended test procedure for commercial refrigeration equipment... amended test procedure will be required on the compliance date of any amended standards for this equipment...
Equipment-Device Task Commonality Analysis and Transfer of Training.
ERIC Educational Resources Information Center
Caro, Paul W.
Procedures were developed to enable training personnel systematically and objectively to determine the potential utility of training devices for teaching how to perform missions in operational rotary wing aircraft. These procedures allow comparison of task stimulus and response elements with corresponding elements in synthetic training equipment.…
30 CFR 254.42 - Exercises for your response personnel and equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Objectives met; and (5) Lessons learned. (e) All records of spill-response exercises must be maintained for... procedures or strategies. The Regional Supervisor may evaluate the results of the exercises and advise the owner or operator of any needed changes in response equipment, procedures, or strategies. (i) Compliance...
Manning, T.K.; Smith, K.E.; Wood, C.D.; Williams, J.B.
1994-01-01
Water-quality samples were collected from Chicod Creek in the Coastal Plain Province of North Carolina during the summer of 1992 as part of the U.S. Geological Survey's National Water-Quality Assessment Program. Chicod Creek is in the Albemarle-Pamlico drainage area, one of four study units designated to test equipment and procedures for collecting and processing samples for the solid-phase extraction of selected pesticides, The equipment and procedures were used to isolate 47 pesticides, including organonitrogen, carbamate, organochlorine, organophosphate, and other compounds, targeted to be analyzed by gas chromatography/mass spectrometry. Sample-collection and processing equipment equipment cleaning and set-up procedures, methods pertaining to collecting, splitting, and solid-phase extraction of samples, and water-quality data resulting from the field test are presented in this report Most problems encountered during this intensive sampling exercise were operational difficulties relating to equipment used to process samples.
30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?
Code of Federal Regulations, 2013 CFR
2013-07-01
... during drilling operations? 250.408 Section 250.408 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.408 May I use alternative procedures or...
30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?
Code of Federal Regulations, 2014 CFR
2014-07-01
... during drilling operations? 250.408 Section 250.408 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.408 May I use alternative procedures or...
30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?
Code of Federal Regulations, 2012 CFR
2012-07-01
... during drilling operations? 250.408 Section 250.408 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.408 May I use alternative procedures or...
ERIC Educational Resources Information Center
Deal, Gerald A.; Montgomery, James A.
This guide describes standard operating job procedures for the grit removal process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up, continuous operation, and shut-down procedures. A description of the equipment used in the process is given. Some theoretical material is presented. (BB)
Crew procedures for microwave landing system operations
NASA Technical Reports Server (NTRS)
Summers, Leland G.
1987-01-01
The objective of this study was to identify crew procedures involved in Microwave Landing System (MLS) operations and to obtain a preliminary assessment of crew workload. The crew procedures were identified for three different complements of airborne equipment coupled to an autopilot. Using these three equipment complements, crew tasks were identified for MLS approaches and precision departures and compared to an ILS approach and a normal departure. Workload comparisons between the approaches and departures were made by using a task-timeline analysis program that obtained workload indexes, i.e., the radio of time required to complete the tasks to the time available. The results showed an increase in workload for the MLS scenario for one of the equipment complements. However, even this workload was within the capacity of two crew members.
Equipment management user's handbook for property custodians
NASA Technical Reports Server (NTRS)
1993-01-01
The NASA Equipment Management User's Handbook for Property Custodians is issued as an instructional guide for personnel designated as property custodians and technical personnel involved in the acquisition, management, and use of NASA-owned equipment. This handbook provides general information and basic operational procedures for processing equipment transactions through the agency-wide NASA Equipment Management System (NEMS). Each NASA installation must prepare supplementary instructions for local requirements beyond the scope of NASA-wide policies and procedures contained herein, or as specified for local implementation in NHB 4200.1, 'NASA Equipment Management Manual.' NHB 4200.1 sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for the acquisition, management, and use of NASA-owned equipment. This handbook is a controlled document, issued in loose-leaf form and revised by page changes. Additional copies for internal use may be obtained through normal distribution.
Pressure Safety: Advanced Live 11459
DOE Office of Scientific and Technical Information (OSTI.GOV)
Glass, George
Many Los Alamos National Laboratory (LANL) operations use pressure equipment and systems. Failure to follow proper procedures when designing or operating pressure systems can result in injuries to personnel and damage to equipment and/or the environment. This manual presents an overview of the requirements and recommendations that address the safe design and operation of pressure systems at LANL.
ERIC Educational Resources Information Center
Weisburd, Melvin I.
The Field Operations and Enforcement Manual for Air Pollution Control, Volume II, explains in detail the following: technology of source control, modification of operations, particulate control equipment, sulfur dioxide removal systems for power plants, and control equipment for gases and vapors; inspection procedures for general sources, fuel…
30 CFR 33.6 - Application procedures and requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Written evidence of the laboratory's independence and current recognition by a laboratory accrediting... the electrical parts of units designed to operate as face equipment (see § 33.38) in accordance with... combination unit that includes electrical parts, and is designed to operate as electric face equipment, as...
30 CFR 33.6 - Application procedures and requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Written evidence of the laboratory's independence and current recognition by a laboratory accrediting... the electrical parts of units designed to operate as face equipment (see § 33.38) in accordance with... combination unit that includes electrical parts, and is designed to operate as electric face equipment, as...
30 CFR 33.6 - Application procedures and requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Written evidence of the laboratory's independence and current recognition by a laboratory accrediting... the electrical parts of units designed to operate as face equipment (see § 33.38) in accordance with... combination unit that includes electrical parts, and is designed to operate as electric face equipment, as...
30 CFR 33.6 - Application procedures and requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Written evidence of the laboratory's independence and current recognition by a laboratory accrediting... the electrical parts of units designed to operate as face equipment (see § 33.38) in accordance with... combination unit that includes electrical parts, and is designed to operate as electric face equipment, as...
30 CFR 56.14218 - Movement of equipment on adjacent tracks.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of equipment on adjacent tracks. 56.14218 Section 56.14218 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Machinery and Equipment Safety Practices and Operational Procedures § 56.14218 Movement of equipment on...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. 197.206 Section 197.206 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Commercial Diving Operations General § 197.206...
The purpose of this SOP is to identify and isolate malfunctioning or damaged equipment for the NHEXAS Arizona research project. This procedure was followed to ensure consistent data custody, storage, transfer and analysis of a high quality during the Arizona NHEXAS project and t...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
40 CFR 68.69 - Operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; (iii) Control measures to be...
Operating environmental laboratories--an overview of analysis equipment procurement and management.
Pandya, G H; Shinde, V M; Kanade, G S; Kondawar, V K
2003-10-01
Management of equipment in an environmental laboratory requires planning involving assessment of the workload on a particular equipment, establishment of criteria and specification for the purchase of equipment, creation of infrastructure for installation and testing of the equipment, optimization of analysis conditions, development of preventive maintenance procedures and establishment of in-house repair facilities. The paper reports the results of such an analysis carried for operating environmental laboratories associated with R& D work, serving as an Govt. laboratory or attached to an Industry for analysing industrial emissions.
30 CFR 33.6 - Application procedures and requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology... the electrical parts of units designed to operate as face equipment (see § 33.38) in accordance with... combination unit that includes electrical parts, and is designed to operate as electric face equipment, as...
33 CFR 104.215 - Vessel Security Officer (VSO).
Code of Federal Regulations, 2011 CFR
2011-07-01
... procedures, including scenario-based response training; (4) Crowd management and control techniques; (5) Operations of security equipment and systems; and (6) Testing and calibration of security equipment and...
Instruction manual model 600F, data transmission test set
NASA Technical Reports Server (NTRS)
1972-01-01
Information necessary for the operation and maintenance of the Model 600F Data Transmission Test Set is presented. A description is contained of the physical and functional characteristics; pertinent installation data; instructions for operating the equipment; general and detailed principles of operation; preventive and corrective maintenance procedures; and block, logic, and component layout diagrams of the equipment and its major component assemblies.
The purpose of this SOP is to describe the procedures used when calibrating and operating balances during the Arizona NHEXAS project and the "Border" study. Keywords: lab; equipment; balances.
The National Human Exposure Assessment Survey (NHEXAS) is a federal interagency rese...
40 CFR 243.201-2 - Recommended procedures: Operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... equipment should meet the applicable provisions of the Occupational Safety and Health Administration... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Recommended procedures: Operations. 243.201-2 Section 243.201-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
Systems workplace for endoscopic surgery.
Irion, K M; Novak, P
2000-01-01
With the advent of minimally invasive surgery (MIS) a decade ago, the requirements for operating rooms (OR) and their equipment have been increased. Compared with conventional open surgery, the new endoscopic techniques require additional tools. Television systems, for video-assisted image acquisition and visualisation, including cameras, monitors and light systems, as well as insufflators, pumps, high-frequency units, lasers and motorised therapy units, are nowadays usually made available on carts during endoscopic surgery. In conjunction with a set of endoscopic instruments, these high-tech units allow new operating techniques to be performed. The benefit for patients has become clear in recent years; however, the technical complexity of OR has also increased considerably. To minimise this problem for the OR personnel, the MIS concept 'OR1' (Operating Room 1) was developed and implemented. OR1 is a fully functional and integrated multi-speciality surgical suite for MIS. The centrepieces of the OR1 are the Storz Communication Bus (SCB) and the advanced image and data archiving system (Aida) from Karl Storz, Tuttlingen, Germany. Both components allow monitoring, access and networking of the MIS equipment and other OR facilities, as well as the acquisition, storage and display of image, patient and equipment data during the endoscopic procedure. A central user interface allows efficient, simplified operation and online clinical images. Due to the system integration, the handling of complex equipment is considerably simplified, logistical procedures in the OR are improved, procedure times are shorter and, particularly noteworthy, operative risk can be reduced through simplified device operation.
Warranty-Guarantee Application Guidelines for Air Force Ground Electronic Equipment.
1980-02-01
perform the on-equipment maintenance. The procedure is comparable to existing Mobile Depot Mainte- nance. The extended outage of failed equipment may be...currently computed. However, because the equipment is fixed geographically, in contrast to the mobility of avionics equipment, operating-time logs could...base environment, many other items of ground equip- ment are deployed at a remote location or, particularly in TAC, may be mobile equipment not
Video. A Guide to the Use of Portable Video Equipment.
ERIC Educational Resources Information Center
Rowatt, Robert W.
This guide describes the portable equipment necessary for preparing a video production, and recommends ways of using that equipment to create a video program. Step by step instructions are provided for setting up the equipment for battery operation or with a mains electricity supply. Information is also given on procedures for recording, playing…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
... procedure for commercial refrigeration equipment because the equipment cannot operate at the specified..., which includes commercial refrigeration equipment, the focus of this notice.\\1\\ Part C specifically... for commercial refrigeration equipment. (42 U.S.C. 6314(a)(6)(C)) On December 8, 2006, DOE published a...
The purpose of this SOP is to identify and isolate malfunctioning or damaged equipment for the Arizona Border Study. This procedure was followed to ensure consistent data custody, storage, transfer and analysis of a high quality during the Arizona NHEXAS project and the Border s...
47 CFR 90.203 - Certification required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... operator must be internally modified to place the equipment in the programmable mode. Further, while in the programmable mode, the equipment shall not be capable of transmitting. The procedures for making the...
Code of Federal Regulations, 2011 CFR
2011-01-01
... equipment needed for normal operation and maintenance. (2) [Reserved] (b) Force Account Proposal (FAP). Upon... the purchase of materials or equipment, shall submit to RUS two copies of its FAP. The FAP shall...
Code of Federal Regulations, 2013 CFR
2013-01-01
... equipment needed for normal operation and maintenance. (2) [Reserved] (b) Force Account Proposal (FAP). Upon... the purchase of materials or equipment, shall submit to RUS two copies of its FAP. The FAP shall...
Code of Federal Regulations, 2010 CFR
2010-01-01
... equipment needed for normal operation and maintenance. (2) [Reserved] (b) Force Account Proposal (FAP). Upon... the purchase of materials or equipment, shall submit to RUS two copies of its FAP. The FAP shall...
Code of Federal Regulations, 2012 CFR
2012-01-01
... equipment needed for normal operation and maintenance. (2) [Reserved] (b) Force Account Proposal (FAP). Upon... the purchase of materials or equipment, shall submit to RUS two copies of its FAP. The FAP shall...
Code of Federal Regulations, 2014 CFR
2014-01-01
... equipment needed for normal operation and maintenance. (2) [Reserved] (b) Force Account Proposal (FAP). Upon... the purchase of materials or equipment, shall submit to RUS two copies of its FAP. The FAP shall...
40 CFR 112.6 - Qualified Facilities Plan Requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...
40 CFR 112.6 - Qualified Facilities Plan Requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...
40 CFR 112.6 - Qualified Facilities Plan Requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...
40 CFR 112.6 - Qualified Facilities Plan Requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...
40 CFR 112.6 - Qualified Facilities Plan Requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...
47 CFR 25.274 - Procedures to be followed in the event of harmful interference.
Code of Federal Regulations, 2013 CFR
2013-10-01
... in the event of harmful interference. (a) The earth station operator whose transmission is suffering harmful interference shall first check the earth station equipment to ensure that the equipment is functioning properly. (b) The earth station operator shall then check all other earth stations in the licensee...
47 CFR 25.274 - Procedures to be followed in the event of harmful interference.
Code of Federal Regulations, 2010 CFR
2010-10-01
... in the event of harmful interference. (a) The earth station operator whose transmission is suffering harmful interference shall first check the earth station equipment to ensure that the equipment is functioning properly. (b) The earth station operator shall then check all other earth stations in the licensee...
47 CFR 25.274 - Procedures to be followed in the event of harmful interference.
Code of Federal Regulations, 2012 CFR
2012-10-01
... in the event of harmful interference. (a) The earth station operator whose transmission is suffering harmful interference shall first check the earth station equipment to ensure that the equipment is functioning properly. (b) The earth station operator shall then check all other earth stations in the licensee...
47 CFR 25.274 - Procedures to be followed in the event of harmful interference.
Code of Federal Regulations, 2014 CFR
2014-10-01
... in the event of harmful interference. (a) The earth station operator whose transmission is suffering harmful interference shall first check the earth station equipment to ensure that the equipment is functioning properly. (b) The earth station operator shall then check all other earth stations in the licensee...
47 CFR 25.274 - Procedures to be followed in the event of harmful interference.
Code of Federal Regulations, 2011 CFR
2011-10-01
... in the event of harmful interference. (a) The earth station operator whose transmission is suffering harmful interference shall first check the earth station equipment to ensure that the equipment is functioning properly. (b) The earth station operator shall then check all other earth stations in the licensee...
Tsibikov, V B; Ragozin, S I; Mikheeva, L V
1985-01-01
A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.
The purpose of this SOP is to describe the procedures used when calibrating and operating balances during the Arizona NHEXAS project and the Border study. Keywords: lab; equipment; balances.
The U.S.-Mexico Border Program is sponsored by the Environmental Health Workgroup of t...
Stereotactic Radiosurgery and Stereotactic Body Radiotherapy (SBRT)
... is observed called pseudoprogression. top of page What equipment is used? There are three basic kinds of ... involved in this procedure and who operates the equipment? The treatment team is comprised of a number ...
Transit satellite system timing capabilities
NASA Technical Reports Server (NTRS)
Finsod, T. D.
1978-01-01
Current time transfer capabilities of the Transit Satellite System are reviewed. Potential improvements in the changes in equipment and operational procedures using operational satellites are discussed.
30 CFR 57.14218 - Movement of equipment on adjacent tracks.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of equipment on adjacent tracks. 57.14218 Section 57.14218 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... MINES Machinery and Equipment Safety Practices and Operational Procedures § 57.14218 Movement of...
Fleet equipment performance measure preventive maintenance model.
DOT National Transportation Integrated Search
2013-02-28
The Texas Department of Transportation : (TxDOT) operates a large fleet of on-road and : off-road equipment. Consequently, fleet : maintenance procedures (specifically preventive : maintenance such as oil changes) represent a : significant cost to th...
The purpose of this SOP is to provide an overview of field sampling procedures. This SOP details the samples taken, the responsibilities of the field staff, an approximate schedule for field operations, persons responsible for analyses, equipment used for sampling, and contents ...
RECOMMENDED OPERATING PROCEDURE NO. 51: GLASS SOURCE ASSESSMENT SAMPLING SYSTEM (GLASS SASS)
The report is a recommended operating procedure (ROP), prepared for use in research activities conducted by EPA's Air and Energy Engineering Research Laboratory (AEERL). he method described is applicable to the stack sampling of flue gas from a rotary kiln and to associated equip...
Two diesel trucks equipped with a particulate filter (DPF) were tested at two ambient temperatures (70oF and 20oF), fuels (ultra low sulfur diesel (ULSD) and biodiesel (B20)) and operating loads (a heavy and light weight). The test procedure included three driving cycles, a cold ...
Military Publications, Index of Test Operations Procedures
1981-10-01
AND RECORDING EQUIPMENT B033862L VOL X ELECTRONIC TEST EQUIPMENT BO33863L VOL XI MAINTENANCE OF ARMY AIRCRAFT; OPERATORS AND CREWMEMBERS MANUALS ...SYSTEMS 718646 6 JUN 68 6-2-186 (L) METEOROLOGICAL EQUIPMENT; METEOROLOGICAL STATIONS, MANUAL OR AUTOMATIC 870954 20 MAR 70 6-2-189 (L) METEOROLOGICAL...69 6-2-250 (L) RELAYS, RADIO 718622 16 APR 69 6-2-262 (L) SUPPRESSORS, VOLTAGE TRANSIENT 720578 MAR 67 6-2-265 (L) SWITCHBOARDS, MANUAL 718647 1 DEC
The purpose of this SOP is to describe procedures for using and maintaining the local area network (LAN) and related microcomputer equipment at the HRP Site of the Arizona Prevention Center. These methods were used for all data operations and maintenance routines during the Ariz...
The purpose of this SOP is to describe procedures for using and maintaining the local area network (LAN) and related microcomputer equipment at the Health Related Professions site at the University of Arizona. These methods were used for all data operations and maintenance routi...
Sustainable reduction of bioreactor contamination in an industrial fermentation pilot plant.
Junker, Beth; Lester, Michael; Leporati, James; Schmitt, John; Kovatch, Michael; Borysewicz, Stan; Maciejak, Waldemar; Seeley, Anna; Hesse, Michelle; Connors, Neal; Brix, Thomas; Creveling, Eric; Salmon, Peter
2006-10-01
Facility experience primarily in drug-oriented fermentation equipment (producing small molecules such as secondary metabolites, bioconversions, and enzymes) and, to a lesser extent, in biologics-oriented fermentation equipment (producing large molecules such as recombinant proteins and microbial vaccines) in an industrial fermentation pilot plant over the past 15 years is described. Potential approaches for equipment design and maintenance, operational procedures, validation/verification testing, medium selection, culture purity/sterility analysis, and contamination investigation are presented, and those approaches implemented are identified. Failure data collected for pilot plant operation for nearly 15 years are presented and best practices for documentation and tracking are outlined. This analysis does not exhaustively discuss available design, operational and procedural options; rather it selectively presents what has been determined to be beneficial in an industrial pilot plant setting. Literature references have been incorporated to provide background and context where appropriate.
Long term pavement performance program protocol for calibrating traffic data collection equipment
DOT National Transportation Integrated Search
1998-05-10
This document describes the procedures that the Long Term Pavement Performance (LTPP) program recommends for ensuring that traffic data collection equipment used for LTPP traffic monitoring efforts operates correctly and collects valid data.
40 CFR 264.1063 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Test methods and procedures. 264.1063... Air Emission Standards for Equipment Leaks § 264.1063 Test methods and procedures. (a) Each owner or operator subject to the provisions of this subpart shall comply with the test methods and procedures...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
40 CFR 61.304 - Test methods and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Test methods and procedures. 61.304... Emissions From Benzene Transfer Operations § 61.304 Test methods and procedures. (a) The procedures for... testing equipment shall be prepared and installed as specified in the appropriate test methods. (2) The...
Isolating USB connections in medical equipment.
Broeders, Jan-Hein
2009-01-01
Although offering several benefits, the universal serial bus (USB) port has not been rapidly adopted for connecting medical equipment. This is because it could affect safety procedures, with equipment not operating isolated from the mains. To overcome this, a single package isolation device has been developed that can be inserted directly into the USB signal path.
Remote Operations of Laser Guide Star Systems: Gemini Observatory.
NASA Astrophysics Data System (ADS)
Oram, Richard J.; Fesquet, Vincent; Wyman, Robert; D'Orgeville, Celine
2011-03-01
The Gemini North telescope, equipped with a 14W laser, has been providing Laser Guide Star Adaptive Optics (LGS AO) regular science queue observations for worldwide astronomers since February 2007. The new 55W laser system for MCAO was installed on the Gemini South telescope in May 2010. In this paper, we comment on how Gemini Observatory developed regular remote operation of the Laser Guide Star Facility and high-power solid-state laser as routine normal operations. Fully remote operation of the LGSF from the Hilo base facility HBF was initially trialed and then optimized and became the standard operating procedure (SOP) for LGS operation in December 2008. From an engineering perspective remote operation demands stable, well characterized and base-lined equipment sets. In the effort to produce consistent, stable and controlled laser parameters (power, wavelength and beam quality) we completed a failure mode effect analysis of the laser system and sub systems that initiated a campaign of hardware upgrades and procedural improvements to the routine maintenance operations. Finally, we provide an overview of normal operation procedures during LGS runs and present a snapshot of data accumulated over several years that describes the overall LGS AO observing efficiency at the Gemini North telescope.
Code of Federal Regulations, 2011 CFR
2011-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2010 CFR
2010-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2014 CFR
2014-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2013 CFR
2013-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
Code of Federal Regulations, 2012 CFR
2012-07-01
... engine and sampling systems. (7) Sample emissions throughout the duty cycle. (8) Record post-test data. (9) Perform post-test procedures to verify proper operation of certain equipment and analyzers. (10... PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.501 Overview. (a) Use the procedures...
33 CFR 274.4 - Pesticide management.
Code of Federal Regulations, 2011 CFR
2011-07-01
... responsibility for using personal protective equipment and clothing provided and for following established health... from pesticide hazards. Basic health and safety practices and procedures including personal protective... maintenance of pest control equipment. Field Operating Agencies (FOA) will designate a single point of contact...
ERIC Educational Resources Information Center
Day, C. William
1999-01-01
Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)
40 CFR 240.209-3 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation during such emergency situations as power failure, air or water supply failure, equipment... devices such as hard hats, gloves, safety glasses, and footwear should be provided for facility employees...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2013 CFR
2013-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2012 CFR
2012-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2014 CFR
2014-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
9 CFR 318.304 - Operations in the thermal processing area.
Code of Federal Regulations, 2011 CFR
2011-01-01
... factor over the specified thermal processing operation times. Temperature/time recording devices shall... minimum initial temperatures and operating procedures for thermal processing equipment, shall be posted in... available to the thermal processing system operator and the inspector. (b) Process indicators and retort...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Sample emissions. (6) Record post-test data. (7) Perform post-test procedures to verify proper operation... PROCEDURES Vehicle Preparation and Running a Test § 1066.401 Overview. (a) Use the procedures detailed in... to: (1) Determine road-load power, test weight, and inertia class. (2) Prepare the vehicle, equipment...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Sample emissions. (6) Record post-test data. (7) Perform post-test procedures to verify proper operation... PROCEDURES Vehicle Preparation and Running a Test § 1066.401 Overview. (a) Use the procedures detailed in... to: (1) Determine road-load power, test weight, and inertia class. (2) Prepare the vehicle, equipment...
Code of Federal Regulations, 2012 CFR
2012-07-01
... pollution control equipment and monitoring equipment, in a manner consistent with safety and good air... include, but is not limited to, monitoring results, review of operation and maintenance procedures, review... VOHAP-containing materials to and from containers, tanks, vats, drums, and piping systems is conducted...
Code of Federal Regulations, 2014 CFR
2014-07-01
... pollution control equipment and monitoring equipment, in a manner consistent with safety and good air... include, but is not limited to, monitoring results, review of operation and maintenance procedures, review... VOHAP-containing materials to and from containers, tanks, vats, drums, and piping systems is conducted...
Code of Federal Regulations, 2013 CFR
2013-07-01
... pollution control equipment and monitoring equipment, in a manner consistent with safety and good air... include, but is not limited to, monitoring results, review of operation and maintenance procedures, review... VOHAP-containing materials to and from containers, tanks, vats, drums, and piping systems is conducted...
14 CFR 121.135 - Manual contents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... flight control or flight following procedures, as applicable. (5) En route flight, navigation, and... of equipment required for the particular type of operation becomes inoperative or unserviceable en route. (6) For domestic or flag operations, appropriate information from the en route operations...
Below, Harald; Ryll, Sylvia; Empen, Klaus; Dornquast, Tina; Felix, Stefan; Rosenau, Heike; Kramer, Sebastian; Kramer, Axel
2010-09-21
In a cardiac procedure room, ventilated by a ventilation and air-conditioning system with turbulent mixed airflow, a protection zone in the operating area could be defined through visualization of airflows. Within this protection zone, no turbulence was detectable in the room air.Under the given conditions, disinfection of all surfaces including all furniture and equipment after the last operation and subsequent draping of furniture and all equipment that could not be removed from the room with sterile surgical drapes improved the indoor room air quality from cleanroom class C to cleanroom class B. This also allows procedures with elevated requirements to be performed in room class 1b.
Snowplow Operator and Supervisor Training: Research Brief
DOT National Transportation Integrated Search
2017-10-01
This project developed a comprehensive snowplow operator and supervisor training program that provides flexibility for states to modify or update the content as needed. The 22-module program covers equipment, materials, techniques and procedures.
40 CFR 63.1044 - Standards-Separator vented to control device.
Code of Federal Regulations, 2012 CFR
2012-07-01
... outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the separator on... operator shall inspect and monitor the air emission control equipment in accordance with the procedures...
40 CFR 63.1044 - Standards-Separator vented to control device.
Code of Federal Regulations, 2010 CFR
2010-07-01
... outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the separator on... operator shall inspect and monitor the air emission control equipment in accordance with the procedures...
40 CFR 63.1044 - Standards-Separator vented to control device.
Code of Federal Regulations, 2013 CFR
2013-07-01
... outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the separator on... operator shall inspect and monitor the air emission control equipment in accordance with the procedures...
40 CFR 63.1044 - Standards-Separator vented to control device.
Code of Federal Regulations, 2014 CFR
2014-07-01
... outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the separator on... operator shall inspect and monitor the air emission control equipment in accordance with the procedures...
40 CFR 63.1044 - Standards-Separator vented to control device.
Code of Federal Regulations, 2011 CFR
2011-07-01
... outdoor exposure to wind, moisture, and sunlight; and the operating practices used for the separator on... operator shall inspect and monitor the air emission control equipment in accordance with the procedures...
Consolidated fuel reprocessing program
NASA Astrophysics Data System (ADS)
1985-04-01
A survey of electrochemical methods applications in fuel reprocessing was completed. A dummy fuel assembly shroud was cut using the remotely operated laser disassembly equipment. Operations and engineering efforts have continued to correct equipment operating, software, and procedural problems experienced during the previous uranium compaigns. Fuel cycle options were examined for the liquid metal reactor fuel cycle. In high temperature gas cooled reactor spent fuel studies, preconceptual designs were completed for the concrete storage cask and open field drywell storage concept. These and other tasks operating under the consolidated fuel reprocessing program are examined.
Small Aircraft Transportation System, Higher Volume Operations Concept: Normal Operations
NASA Technical Reports Server (NTRS)
Abbott, Terence S.; Jones, Kenneth M.; Consiglio, Maria C.; Williams, Daniel M.; Adams, Catherine A.
2004-01-01
This document defines the Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) concept for normal conditions. In this concept, a block of airspace would be established around designated non-towered, non-radar airports during periods of poor weather. Within this new airspace, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Using onboard equipment and procedures, they would then approach and land at the airport. Departures would be handled in a similar fashion. The details for this operational concept are provided in this document.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
...This proposed rule addresses air ambulance and commercial helicopter operations, part 91 helicopter operations, and load manifest requirements for all part 135 aircraft. From 2002 to 2008, there has been an increase in fatal helicopter air ambulance accidents. To address these safety concerns, the FAA is proposing to implement operational procedures and require additional equipment on board helicopter air ambulances. Many of these proposed requirements currently are found in agency guidance publications and would address National Transportation Safety Board (NTSB) safety recommendations. Some of these safety concerns are not unique to the helicopter air ambulance industry and affect all commercial helicopter operations. Accordingly, the FAA also is proposing to amend regulations pertaining to all commercial helicopter operations conducted under part 135 to include equipment requirements, pilot training, and alternate airport weather minima. The changes are intended to provide certificate holders and pilots with additional tools and procedures that will aid in preventing accidents.
10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-01
Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less
Code of Federal Regulations, 2010 CFR
2010-04-01
...'s policy on the presence and operation of electronic recording equipment at such proceedings and to... AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATIVE PRACTICES AND PROCEDURES Electronic Media Coverage of Public Administrative Proceedings; Guideline on Policy and Procedures...
Code of Federal Regulations, 2014 CFR
2014-04-01
... prescribed in the Standard Operating Procedures Manual and shall perform in the manner for which it was... Hemoglobinometer Standardize against cyanmethemoglobin standard ......do Refractometer Standardize against... microorganisms. The effectiveness of the sterilization procedure shall be no less than that achieved by an...
Code of Federal Regulations, 2012 CFR
2012-04-01
... prescribed in the Standard Operating Procedures Manual and shall perform in the manner for which it was... Hemoglobinometer Standardize against cyanmethemoglobin standard ......do Refractometer Standardize against... microorganisms. The effectiveness of the sterilization procedure shall be no less than that achieved by an...
Code of Federal Regulations, 2010 CFR
2010-04-01
... prescribed in the Standard Operating Procedures Manual and shall perform in the manner for which it was... Hemoglobinometer Standardize against cyanmethemoglobin standard ......do Refractometer Standardize against... microorganisms. The effectiveness of the sterilization procedure shall be no less than that achieved by an...
Code of Federal Regulations, 2011 CFR
2011-04-01
... prescribed in the Standard Operating Procedures Manual and shall perform in the manner for which it was... Hemoglobinometer Standardize against cyanmethemoglobin standard ......do Refractometer Standardize against... microorganisms. The effectiveness of the sterilization procedure shall be no less than that achieved by an...
Code of Federal Regulations, 2013 CFR
2013-04-01
... prescribed in the Standard Operating Procedures Manual and shall perform in the manner for which it was... Hemoglobinometer Standardize against cyanmethemoglobin standard ......do Refractometer Standardize against... microorganisms. The effectiveness of the sterilization procedure shall be no less than that achieved by an...
NASA Technical Reports Server (NTRS)
Newsom, B. D.
1978-01-01
A biological system proposed to restrain a monkey in the Spacelab was tested under operational conditions using typical metabolic and telemetered cardiovascular instrumentation. Instrumentation, interfaced with other electronics, and data gathering during a very active operational mission were analyzed for adequacy of procedure and success of data handling by the onboard computer.
ERIC Educational Resources Information Center
Deal, Gerald A.; Montgomery, James A.
This guide describes standard operating job procedures for the screening and grinding process of wastewater treatment facilities. The objective of this process is the removal of coarse materials from the raw waste stream for the protection of subsequent equipment and processes. The guide gives step-by-step instructions for safety inspection,…
ERIC Educational Resources Information Center
Schwing, Carl M.
This guide describes standard operating job procedures for the screening and grinding process of wastewater treatment facilities. The objective of this process is the removal of coarse materials from the raw waste stream for the protection of subsequent equipment and processes. The guide gives step-by-step instructions for safety inspection,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The study was conducted to determine the pollutants of concern in the Istanbul metropolitan area, monitoring equipment specifications and monitoring and data analysis procedures for an air quality and meteorological monitoring program. This volume consists of: (1) Introduction; (2) Selection of Pollutants of Concern; (3) Selection of Monitoring Locations; (4) Equipment Specifications; (5) Site Preparation and Security; (6) Standard Operating Procedures; (7) Data Reduction and Analysis; (8) Future Phases; (9) References. Also included are Attachments A through G and List of Tables and List of Figures.
Study of EVA operations associated with satellite services
NASA Technical Reports Server (NTRS)
Nash, J. O.; Wilde, R. D.
1982-01-01
Extravehicular mobility unit (EMU) factors associated with satellite servicing activities are identified and the EMU improvements necessary to enhance satellite servicing operations are outlined. Areas of EMU capabilities, equipment and structural interfaces, time lines, EMU modifications for satellite servicing, environmental hazards, and crew training are vital to manned Eva/satellite services and as such are detailed. Evaluation of EMU capabilities indicates that the EMU can be used in performing near term, basic satellite servicing tasks; however, satellite servicing is greatly enhanced by incorporating key modifications into the EMU. The servicing missions involved in contamination sensitive payload repair are illustrated. EVA procedures and equipment can be standardized, reducing both crew training time and in orbit operations time. By standardizing and coordinating procedures, mission cumulative time lines fall well within the EMU capability.
Pretty, Iain A; Maupomé, Gerardo
2004-04-01
Dentists are involved in diagnosing disease in every aspect of their clinical practice. A range of tests, systems, guides and equipment--which can be generally referred to as diagnostic procedures--are available to aid in diagnostic decision making. In this era of evidence-based dentistry, and given the increasing demand for diagnostic accuracy and properly targeted health care, it is important to assess the value of such diagnostic procedures. Doing so allows dentists to weight appropriately the information these procedures supply, to purchase new equipment if it proves more reliable than existing equipment or even to discard a commonly used procedure if it is shown to be unreliable. This article, the first in a 6-part series, defines several concepts used to express the usefulness of diagnostic procedures, including reliability and validity, and describes some of their operating characteristics (statistical measures of performance), in particular, specificity and sensitivity. Subsequent articles in the series will discuss the value of diagnostic procedures used in daily dental practice and will compare today's most innovative procedures with established methods.
The procedure execution manager and its application to Advanced Photon Source operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borland, M.
1997-06-01
The Procedure Execution Manager (PEM) combines a complete scripting environment for coding accelerator operation procedures with a manager application for executing and monitoring the procedures. PEM is based on Tcl/Tk, a supporting widget library, and the dp-tcl extension for distributed processing. The scripting environment provides support for distributed, parallel execution of procedures along with join and abort operations. Nesting of procedures is supported, permitting the same code to run as a top-level procedure under operator control or as a subroutine under control of another procedure. The manager application allows an operator to execute one or more procedures in automatic, semi-automatic,more » or manual modes. It also provides a standard way for operators to interact with procedures. A number of successful applications of PEM to accelerator operations have been made to date. These include start-up, shutdown, and other control of the positron accumulator ring (PAR), low-energy transport (LET) lines, and the booster rf systems. The PAR/LET procedures make nested use of PEM`s ability to run parallel procedures. There are also a number of procedures to guide and assist tune-up operations, to make accelerator physics measurements, and to diagnose equipment. Because of the success of the existing procedures, expanded use of PEM is planned.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Purpose. 18.90 Section 18.90 Mineral Resources... PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.90 Purpose. The regulations of this subpart E set forth the procedures and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Purpose. 18.90 Section 18.90 Mineral Resources... PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.90 Purpose. The regulations of this subpart E set forth the procedures and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Purpose. 18.90 Section 18.90 Mineral Resources... PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.90 Purpose. The regulations of this subpart E set forth the procedures and...
HOW TO SELECT THE PROPER SECURITY AND EQUIPMENT SURVEILLANCE SYSTEMS TO PROTECT YOUR FACILITIES.
ERIC Educational Resources Information Center
Honeywell, Inc., Minneapolis, Minn.
IN PRESENTING A SURVEY OF MODERN SECURITY SYSTEMS, THIS BOOKLET DISCUSSES THE REQUIREMENTS FOR SURVEILLANCE AND PROTECTION OF AREAS, PERIMETER, AND OBJECTS. A VARIETY OF EQUIPMENT IS DESCRIBED WITH DISCUSSION OF OPERATING PROCEDURES, COSTS, AND RECENT DEVELOPMENTS IN SECURITY SYSTEMS. (JT)
30 CFR 18.93 - Application for field approval; filing procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Application for field approval; filing... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.93 Application for field approval; filing...
30 CFR 18.93 - Application for field approval; filing procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Application for field approval; filing... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.93 Application for field approval; filing...
Operating manual for the Bulk Shielding Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-04-01
The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR.
Operating manual for the Bulk Shielding Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-03-01
The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR.
14 CFR 135.433 - Maintenance and preventive maintenance training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD... personnel) who determines the adequacy of work done is fully informed about procedures and techniques and new equipment in use and is competent to perform that person's duties. ...
The purpose of this SOP is to describe the procedures for calibrating Harvard particulate matter (PM) samplers. This procedure applies directly to the Harvard particulate matter (PM) samplers used during the Arizona NHEXAS project and the Border study. Keywords: lab; equipment;...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-05
... Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non... procedures described below. To comply with the procedural requirements of E-Filing, at least ten (10) days... equipment lineup, accident scenario, or interaction mode not reviewed and approved as part of the design and...
30 CFR 250.514 - Well-control fluids, equipment, and operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... displace kill-weight fluid from the wellbore and/or riser to an underbalanced state, you must obtain... displacing the kill-weight fluid and provide detailed step-by-step written procedures describing how you will... barriers, (3) BOP procedures you will use while displacing kill-weight fluids, and (4) Procedures you will...
30 CFR 250.514 - Well-control fluids, equipment, and operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... displace kill-weight fluid from the wellbore and/or riser to an underbalanced state, you must obtain... displacing the kill-weight fluid and provide detailed step-by-step written procedures describing how you will... barriers, (3) BOP procedures you will use while displacing kill-weight fluids, and (4) Procedures you will...
Operational flight evaluation of the two-segment approach for use in airline service
NASA Technical Reports Server (NTRS)
Schwind, G. K.; Morrison, J. A.; Nylen, W. E.; Anderson, E. B.
1975-01-01
United Airlines has developed and evaluated a two-segment noise abatement approach procedure for use on Boeing 727 aircraft in air carrier service. In a flight simulator, the two-segment approach was studied in detail and a profile and procedures were developed. Equipment adaptable to contemporary avionics and navigation systems was designed and manufactured by Collins Radio Company and was installed and evaluated in B-727-200 aircraft. The equipment, profile, and procedures were evaluated out of revenue service by pilots representing government agencies, airlines, airframe manufacturers, and professional pilot associations. A system was then placed into scheduled airline service for six months during which 555 two-segment approaches were flown at three airports by 55 airline pilots. The system was determined to be safe, easy to fly, and compatible with the airline operational environment.
Below, Harald; Ryll, Sylvia; Empen, Klaus; Dornquast, Tina; Felix, Stefan; Rosenau, Heike; Kramer, Sebastian; Kramer, Axel
2010-01-01
In a cardiac procedure room, ventilated by a ventilation and air-conditioning system with turbulent mixed airflow, a protection zone in the operating area could be defined through visualization of airflows. Within this protection zone, no turbulence was detectable in the room air. Under the given conditions, disinfection of all surfaces including all furniture and equipment after the last operation and subsequent draping of furniture and all equipment that could not be removed from the room with sterile surgical drapes improved the indoor room air quality from cleanroom class C to cleanroom class B. This also allows procedures with elevated requirements to be performed in room class 1b. PMID:20941336
Study of dispersed small wind systems interconnected with a utility distribution system
NASA Astrophysics Data System (ADS)
Curtice, D.; Patton, J.; Bohn, J.; Sechan, N.
1980-03-01
Operating problems for various penetrations of small wind systems connected to the distribution system on a utility are defined. Protection equipment, safety hazards, feeder voltage regulation, line losses, and voltage flicker problems are studied, assuming different small wind systems connected to an existing distribution system. To identify hardware deficiencies, possible solutions provided by off-the-shelf hardware and equipment are assessed. Results of the study indicate that existing techniques are inadequate for detecting isolated operation of a small wind system. Potential safety hazards posed by small wind systems are adequately handled by present work procedures although these procedures require a disconnect device at synchronous generator and self commutated inverter small wind systems.
Minimally invasive surgery. Future developments.
Wickham, J E
1994-01-15
The rapid development of minimally invasive surgery means that there will be fundamental changes in interventional treatment. Technological advances will allow new minimally invasive procedures to be developed. Application of robotics will allow some procedures to be done automatically, and coupling of slave robotic instruments with virtual reality images will allow surgeons to perform operations by remote control. Miniature motors and instruments designed by microengineering could be introduced into body cavities to perform operations that are currently impossible. New materials will allow changes in instrument construction, such as use of memory metals to make heat activated scissors or forceps. With the reduced trauma associated with minimally invasive surgery, fewer operations will require long hospital stays. Traditional surgical wards will become largely redundant, and hospitals will need to cope with increased through-put of patients. Operating theatres will have to be equipped with complex high technology equipment, and hospital staff will need to be trained to manage it. Conventional nursing care will be carried out more in the community. Many traditional specialties will be merged, and surgical training will need fundamental revision to ensure that surgeons are competent to carry out the new procedures.
Naval Training Equipment Center Index of Technical Reports,
1982-09-01
741 RECOMMENDED PROCEDURES AND TRAINING NAVAL TRAINING AIDS. tAMPHIBIOUS OPERATIONS PROCEDURES AND RESEARCH PLANNING AD- 642 590 TRAINING DEVICES FOR...PROCEDURES AND RESEARCH PLANNING OBSERVATION AND FIRE CONTROL WITH FOR ANTI-AIR WARFARE TRAINING SPECIFIC REFERENCE TO THE TRAINING *AMPUTEES PROGRAM...619 AD- 707 757 NAVAL PERSONNEL *COMMUNICATION SATELLITES PROCEDURES AND RESEARCH PLANNING *COMBUSTION PRODUCTS Computer Managed Instruction by FOR
Maximally Expressive Modeling of Operations Tasks
NASA Technical Reports Server (NTRS)
Jaap, John; Richardson, Lea; Davis, Elizabeth
2002-01-01
Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed, the information sought is at the cutting edge of scientific endeavor, and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a "maximally expressive" modeling schema.
Understanding Current Safety Issues for Trajectory Based Operations
NASA Technical Reports Server (NTRS)
Feary, Michael; Stewart, Michael
2016-01-01
Increases in procedural complexity were investigated as a possible contributor to flight path deviations in airline operations. Understanding current operational issues and their causes must be embraced to maintain current safety standards while increasing future functionality. ASRS data and expert narratives were used to discover factors relating to pilot deviations. Our investigation pointed to ATC intervention, automation confusion, procedure design, and mixed equipment as primary issues. Future work will need to include objective data and mitigation strategies.
30 CFR 57.14208 - Warning devices.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warning devices. 57.14208 Section 57.14208... Equipment Safety Practices and Operational Procedures § 57.14208 Warning devices. (a) Visible warning... four feet beyond the rear of the equipment shall have a warning flag at the end of the projection...
30 CFR 57.14208 - Warning devices.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Warning devices. 57.14208 Section 57.14208... Equipment Safety Practices and Operational Procedures § 57.14208 Warning devices. (a) Visible warning... four feet beyond the rear of the equipment shall have a warning flag at the end of the projection...
30 CFR 57.14208 - Warning devices.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Warning devices. 57.14208 Section 57.14208... Equipment Safety Practices and Operational Procedures § 57.14208 Warning devices. (a) Visible warning... four feet beyond the rear of the equipment shall have a warning flag at the end of the projection...
30 CFR 57.14208 - Warning devices.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warning devices. 57.14208 Section 57.14208... Equipment Safety Practices and Operational Procedures § 57.14208 Warning devices. (a) Visible warning... four feet beyond the rear of the equipment shall have a warning flag at the end of the projection...
30 CFR 57.14208 - Warning devices.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Warning devices. 57.14208 Section 57.14208... Equipment Safety Practices and Operational Procedures § 57.14208 Warning devices. (a) Visible warning... four feet beyond the rear of the equipment shall have a warning flag at the end of the projection...
20 CFR 638.506 - Purchase of vocational supplies and equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... 638.506 Section 638.506 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.506 Purchase of vocational supplies and equipment. The Job Corps Director shall develop procedures for the low...
The universal serial bus endoscope: design and initial clinical experience.
Hernandez-Zendejas, Gregorio; Dobke, Marek K; Guerrerosantos, Jose
2004-01-01
Endoscopic forehead lift is a well-established procedure in aesthetic plastic surgery. Many agree that currently available video-endoscopic equipment is bulky, multipieced and sometimes cumbersome in the operating theater. A novel system, the Universal Serial Bus Endoscope (USBE) was designed to simplify and reduce the number of necessary equipment pieces in the endoscopic setup. The USBE is attached by a single cable to a Universal Serial Bus (USB) port of a laptop computer. A built-in miniaturized cold light source provides illumination. A built-in digital camera chip enables procedure recording. The real-time images and movies obtained with USBE are displayed on the computer's screen and recorded on the laptop's hard disk drive. In this study, 25 patients underwent endoscopic browlift using the USBE system to test its clinical usefulness, all with good results and without complications or need for revision. The USBE was found to be reliable and easier to use than current video-endoscope equipment. The operative time needed to complete the procedure by the authors was reduced approximately 50%. The design and main technical characteristics of the USBE are presented.
Evaluation of Winter Operational Runway Friction Measurement Equipment, Procedures, and Research
NASA Technical Reports Server (NTRS)
1995-01-01
This document produced by the FAA/Industry Winter Runway Friction Measurement and Reporting Working Group, is designed to provide an overview of current information on the present guidance, practices, and procedures for reporting runway pavement surface conditions during winter operations at airports. It contains recommendations on the desirability of providing the best procedural consistency and standardization and discusses the available means to implement the guidance that will result in improved aviation safety at airports during hazardous winter conditions.
JSC Design and Procedural Standards, JSC-STD-8080
NASA Technical Reports Server (NTRS)
Punch, Danny T.
2011-01-01
This document provides design and procedural requirements appropriate for inclusion in specifications for any human spaceflight program, project, spacecraft, system, or end item. The term "spacecraft" as used in the standards includes launch vehicles, orbital vehicles, non-terrestrial surface vehicles, and modules. The standards are developed and maintained as directed by Johnson Space Center (JSC) Policy Directive JPD 8080.2, JSC Design and Procedural Standards for Human Space Flight Equipment. The Design and Procedural Standards contained in this manual represent human spacecraft design and operational knowledge applicable to a wide range of spaceflight activities. These standards are imposed on JSC human spaceflight equipment through JPD 8080.2. Designers shall comply with all design standards applicable to their design effort.
30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?
Code of Federal Regulations, 2011 CFR
2011-07-01
... during drilling operations? 250.408 Section 250.408 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.408 May I use...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keck, R.D.
1997-01-21
The purpose of this document is to record the technical evaluation of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements, WHC-SD-CP-OSR- 010, Rev. 0. Kay 1994, Section 3.2.3, `Supply Ventilation System Seismic Shutdown.` This document, with its appendices, provides the following: 1. The system functional requirements for determining system operability (Section 3). 2. Evaluations of equipment to determine the safety boundary for the system (Section 4). 3. A list of annotated drawings which show the safety envelope boundaries (Appendix C). 4. A list of the safety envelope equipment (Appendix B). 5. Functionalmore » requirements for the individual safety envelope equipment, including appropriate setpoints and process parameters (Section 4.1). 6. A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the system equipment within the safety envelope (Sections 5 and 6 and Appendix A).« less
An evaluation of winter operational runway friction measurement equipment, procedures and research
DOT National Transportation Integrated Search
1995-01-25
For many years, the aviation community has struggled with runway friction reporting practices. Airport operations personnel, in taking on the responsibility for conducting friction measurements during winter storms, work diligently to keep up with ra...
29 CFR 1910.420 - Safe practices manual.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Commercial Diving Operations General Operations Procedures § 1910.420..., equipment failure, adverse environmental conditions, and medical illness and injury. [42 FR 37668, July 22...
30 CFR 250.800 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production Safety Systems... environments. Production safety systems operated in subfreezing climates shall utilize equipment and procedures...
30 CFR 250.800 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production Safety Systems... environments. Production safety systems operated in subfreezing climates shall utilize equipment and procedures...
30 CFR 250.800 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production Safety Systems... environments. Production safety systems operated in subfreezing climates shall utilize equipment and procedures...
77 FR 26358 - Petition for Waiver of Compliance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-03
... parts of 49 CFR (Parts 216, Special Notice and Emergency Order Procedures: Railroad Track, Locomotive and Equipment; Part 217, Railroad Operating Rules; Part 218, Railroad Operating Practices; Part 229, Railroad Locomotive Safety Standards; Part 233, Signal Systems Reporting Requirements; Part 235...
[Features of the maintenance of automated developing machines].
Koveshnikov, A I
1999-01-01
Based on his long-term own experience the author gives recommendations on the assembly, adjustment, operation, and preventive maintenance of automatic developing machines. Procedures are presented for evaluating the quality of X-ray films and controlling the activity of operating qualities of a developer while machining photographic materials. Troubles and malfunction of equipment and procedures for their elimination are shown to affect the quality of development of films.
NASA Technical Reports Server (NTRS)
Jaap, John; Davis, Elizabeth; Richardson, Lea
2004-01-01
Planning and scheduling systems organize tasks into a timeline or schedule. Tasks are logically grouped into containers called models. Models are a collection of related tasks, along with their dependencies and requirements, that when met will produce the desired result. One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed; the information sought is at the cutting edge of scientific endeavor; and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a maximally expressive modeling schema.
Use of a Modern Polymerization Pilot-Plant for Undergraduate Control Projects.
ERIC Educational Resources Information Center
Mendoza-Bustos, S. A.; And Others
1991-01-01
Described is a project where students gain experience in handling large volumes of hazardous materials, process start up and shut down, equipment failures, operational variations, scaling up, equipment cleaning, and run-time scheduling while working in a modern pilot plant. Included are the system design, experimental procedures, and results. (KR)
ERIC Educational Resources Information Center
Braunstein, Jean; Janky, James M.
This paper describes the network coordination for the Health, Education, Telecommunications (HET) system. Specifically, it discusses HET network performance as a function of a specially-developed coordination system which was designed to link terrestrial equipment to satellite operations centers. Because all procedures and equipment developed for…
Meter shop equipment, techniques, and operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, R.F.
1995-12-01
The development of new equipment inevitably results in new techniques and operational procedures to be implemented. Innovative techniques can result in operational changes and the development of new equipment. An operational modification opens the door for the development of new ideas, new equipment, and new techniques. This constant cycle of change promotes a continuous series of economic evaluations and decisions. Equipment and technological changes in measuring natural gas have resulted in modifications from past practices. The changes underway today will influence the way we plan and budget for the future, and, most notably, will change the way we repair gasmore » meters. The meter shop of today will need to look at the way that these changes will become available and how they will help efforts in reducing costs and increasing productivity. For instance, the standard three- and four-chambered diaphragm gas meter design has not been significantly changed in the past few decades aside from having heavy, cast iron bodies changed to lightweight aluminum bodies and utilizing a few plastic parts. But changes have been made, and more are on the threshold.« less
30 CFR 250.1633 - Production measurement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Production measurement. 250.1633 Section 250... SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1633 Production measurement. (a) General. Measurement equipment and security procedures shall be designed, installed, used, maintained, and...
Enhancing DSN Operations Efficiency with the Discrepancy Reporting Management System (DRMS)
NASA Technical Reports Server (NTRS)
Chatillon, Mark; Lin, James; Cooper, Tonja M.
2003-01-01
The DRMS is the Discrepancy Reporting Management System used by the Deep Space Network (DSN). It uses a web interface and is a management tool designed to track and manage: data outage incidents during spacecraft tracks against equipment and software known as DRs (discrepancy Reports), to record "out of pass" incident logs against equipment and software in a Station Log, to record instances where equipment has be restarted or reset as Reset records, and to electronically record equipment readiness status across the DSN. Tracking and managing these items increases DSN operational efficiency by providing: the ability to establish the operational history of equipment items, data on the quality of service provided to the DSN customers, the ability to measure service performance, early insight into processes, procedures and interfaces that may need updating or changing, and the capability to trace a data outage to a software or hardware change. The items listed above help the DSN to focus resources on areas of most need.
Cost accounting in radiation oncology: a computer-based model for reimbursement.
Perez, C A; Kobeissi, B; Smith, B D; Fox, S; Grigsby, P W; Purdy, J A; Procter, H D; Wasserman, T H
1993-04-02
The skyrocketing cost of medical care in the United States has resulted in multiple efforts in cost containment. The present work offers a rational computer-based cost accounting approach to determine the actual use of resources in providing a specific service in a radiation oncology center. A procedure-level cost accounting system was developed by using recorded information on actual time and effort spent by individual staff members performing various radiation oncology procedures, and analyzing direct and indirect costs related to staffing (labor), facilities and equipment, supplies, etc. Expenditures were classified as direct or indirect and fixed or variable. A relative value unit was generated to allocate specific cost factors to each procedure. Different costs per procedure were identified according to complexity. Whereas there was no significant difference in the treatment time between low-energy (4 and 6 MV) or high-energy (18 MV) accelerators, there were significantly higher costs identified in the operation of a high-energy linear accelerator, a reflection of initial equipment investment, quality assurance and calibration procedures, maintenance costs, service contract, and replacement parts. Utilization of resources was related to the complexity of the procedures performed and whether the treatments were delivered to inpatients or outpatients. In analyzing time motion for physicians and other staff, it was apparent that a greater effort must be made to train the staff to accurately record all times involved in a given procedure, and it is strongly recommended that each institution perform its own time motion studies to more accurately determine operating costs. Sixty-six percent of our facility's global costs were for labor, 20% for other operating expenses, 10% for space, and 4% for equipment. Significant differences were noted in the cost allocation for professional or technical functions, as labor, space, and equipment costs are higher in the latter. External beam treatment-related procedures accounted for more than 50% of all technical and professional revenues, simulation for 8% to 10%, and other physics/dosimetry procedures for 11% to 14% of revenues. Some discrepancies were identified between the actual cost and level of reimbursement of various procedures. Details are described in the manuscript. It is imperative to develop an equitable reimbursement system for radiation oncology services, based on cost accounting and other measures that may enhance productivity and reduce the cost per procedure unit, while at the same time preserving the highest quality of service provided to patients.
NASA Technical Reports Server (NTRS)
Houseman, John; Patzold, Jack D.; Jackson, Julie R.; Brown, Pamela R.
1999-01-01
The loading of spacecraft with Hydrazine type fuels has long been recognized as a hazardous operation. This has led to safety strategies that include the use of SCAPE protective suits for personnel. The use of SCAPE suits have an excellent safety record, however there are associated drawbacks. Drawbacks include the high cost of maintaining and cleaning the suits, reduced mobility and dexterity when wearing the suits, the requirement for extensive specialized health and safety training, and the need to rotate personnel every two hours. A study was undertaken to look at procedures and/or equipment to eliminate or reduce the time spent in SCAPE-type operations. The major conclusions are drawn from observations of the loading of the JPL/NASA spacecraft Deep Space One (DS1) at KSC and the loading of a commercial communications satellite by Motorola at Vandenberg AF Base. The DS1 operations require extensive use of SCAPE suits, while the Motorola operation uses only SPLASH attire with a two-man team on standby in SCAPE. The Motorola team used very different loading equipment and procedures based on an integrated approach involving the propellant supplier. Overall, the Motorola approach was very clean, much faster and simpler than the DS1 procedure. The DS1 spacecraft used a bladder in the propellant tank, whereas the Motorola spacecraft used a Propellant Management Device (PMD). The Motorola approach cannot be used for tanks with bladders. To overcome this problem, some new procedures and new equipment are proposed to enable tanks with bladders to be loaded without using SCAPE, using a modified Motorola approach. Overall, it appears feasible to adopt the non-SCAPE approach while maintaining a very high degree of safety and reliability.
40 CFR 1048.515 - What are the field-testing procedures?
Code of Federal Regulations, 2010 CFR
2010-07-01
... CFR part 1065, subpart J, we describe the equipment and sampling methods for testing engines in the... specify in § 1048.101(c) for any continuous sampling period of at least 120 seconds under the following ranges of operation and operating conditions: (1) Engine operation during the emission sampling period...
Energy Saving Melting and Revert Reduction Technology: Melting Efficiency in Die Casting Operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Schwam
2012-12-15
This project addressed multiple aspects of the aluminum melting and handling in die casting operations, with the objective of increasing the energy efficiency while improving the quality of the molten metal. The efficiency of melting has always played an important role in the profitability of aluminum die casting operations. Consequently, die casters need to make careful choices in selecting and operating melting equipment and procedures. The capital cost of new melting equipment with higher efficiency can sometimes be recovered relatively fast when it replaces old melting equipment with lower efficiency. Upgrades designed to improve energy efficiency of existing equipment maymore » be well justified. Energy efficiency is however not the only factor in optimizing melting operations. Melt losses and metal quality are also very important. Selection of melting equipment has to take into consideration the specific conditions at the die casting shop such as availability of floor space, average quantity of metal used as well as the ability to supply more metal during peaks in demand. In all these cases, it is essential to make informed decisions based on the best available data.« less
PV systems photoelectric parameters determining for field conditions and real operation conditions
NASA Astrophysics Data System (ADS)
Shepovalova, Olga V.
2018-05-01
In this work, research experience and reference documentation have been generalized related to PV systems photoelectric parameters (PV array output parameters) determining. The basic method has been presented that makes it possible to determine photoelectric parameters with the state-of-the-art reliability and repeatability. This method provides an effective tool for PV systems comparison and evaluation of PV system parameters that the end-user will have in the course of its real operation for compliance with those stipulated in reference documentation. The method takes in consideration all parameters that may possibly affect photoelectric performance and that are supported by sufficiently valid procedures for their values testing. Test conditions, requirements for equipment subject to tests and test preparations have been established and the test procedure for fully equipped PV system in field tests and in real operation conditions has been described.
NASA Technical Reports Server (NTRS)
1971-01-01
The requirements for the activities involved, and the procedures used by the crew in the operations of the modular space station are presented. All crew-related characteristics of the station and its operations are indicated. The interior configuration and arrangement of each of the space station modules, the facilities and equipment in the module and their operation are described as related to crew habitability. The crew activities and procedures involved in the operation of the station in the accomplishment of its primary mission are defined. The operations involved in initial station buildup, and the on-orbit operation and maintenance of the station and its subsystems to support the experimental program are included. A general description of experiment operations is also given.
Naval Personnel Can Improve Compliance With the Berry Amendment and the Buy American Act
2015-08-12
Amendment. Introduction 2 │ DODIG-2015-161 • FSG 83—textiles, leather and furs,6 apparel , and shoes; • FSG 84— clothing , individual equipment and insignia...personnel amended standard operating procedures and internal processes to improve compliance with the Berry Amendment. NAWCAD-Lakehurst personnel...corrective action and amended standard operating procedures and internal processes to improve compliance with the Buy American Act. Additionally, NAWCAD
Effluent Monitoring Procedures: Nutrients. Student Reference Manual.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. The Student Reference Manual provides step-by-step procedures for laboratory application of equipment operating…
2012-12-01
mineral and organic materials situated beneath an aqueous layer. PEDs assembled, installed, and retrieved following these procedures will be suitable...at a minimum, wearing adequate protective equipment, flotation devices, and making use of lifelines. 8.0 References Massachusetts Institute of
Effluent Monitoring Procedures: Metals Analyses. Student Reference Manual.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. The Student Reference Manual provides step-by-step procedures for laboratory application of equipment operating…
40 CFR 63.6120 - What performance tests and other procedures must I use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... parameters associated with operation of the stationary combustion turbine and any emission control device... Turbines Testing and Initial Compliance Requirements § 63.6120 What performance tests and other procedures.... (e) If your stationary combustion turbine is not equipped with an oxidation catalyst, you must...
40 CFR 63.6120 - What performance tests and other procedures must I use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... parameters associated with operation of the stationary combustion turbine and any emission control device... Turbines Testing and Initial Compliance Requirements § 63.6120 What performance tests and other procedures.... (e) If your stationary combustion turbine is not equipped with an oxidation catalyst, you must...
40 CFR 63.6120 - What performance tests and other procedures must I use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... parameters associated with operation of the stationary combustion turbine and any emission control device... Turbines Testing and Initial Compliance Requirements § 63.6120 What performance tests and other procedures.... (e) If your stationary combustion turbine is not equipped with an oxidation catalyst, you must...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... definitions for key terms. DATES: These test procedures are effective on April 8, 2010. The incorporation by... as of April 8, 2010. ADDRESSES: You may review copies of all materials related to this rulemaking at... supply characteristics, operational test temperatures, instrumentation requirements, setup connections...
Minimally invasive surgery. Future developments.
Wickham, J. E.
1994-01-01
The rapid development of minimally invasive surgery means that there will be fundamental changes in interventional treatment. Technological advances will allow new minimally invasive procedures to be developed. Application of robotics will allow some procedures to be done automatically, and coupling of slave robotic instruments with virtual reality images will allow surgeons to perform operations by remote control. Miniature motors and instruments designed by microengineering could be introduced into body cavities to perform operations that are currently impossible. New materials will allow changes in instrument construction, such as use of memory metals to make heat activated scissors or forceps. With the reduced trauma associated with minimally invasive surgery, fewer operations will require long hospital stays. Traditional surgical wards will become largely redundant, and hospitals will need to cope with increased through-put of patients. Operating theatres will have to be equipped with complex high technology equipment, and hospital staff will need to be trained to manage it. Conventional nursing care will be carried out more in the community. Many traditional specialties will be merged, and surgical training will need fundamental revision to ensure that surgeons are competent to carry out the new procedures. Images Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 PMID:8312776
Systems Engineering Management Procedures
1966-03-10
load -..................................................... tch 2 1t55 Trade Study-Companson ,f Methods for Measuring Quantities of Loaded... method of system operation and the ancillary equipment required such as instru- system elements is a highly involved process mentation. depot tooling...Installation and checkout. MiGI-Maintenance g-round equipment. IM-Item manager. NIP-Materiel improvement proipct. indenturo-A method of showing relationships
The purpose of this SOP is to describe the preparation and assembly of materials and samplers to go into the field for use during the Arizona NHEXAS project and the "Border" study. Keywords: field; equipment.
The National Human Exposure Assessment Survey (NHEXAS) is a federal i...
40 CFR 63.120 - Storage vessel provisions-procedures to determine compliance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... with § 63.119(b) of this subpart (storage vessel equipped with a fixed roof and internal floating roof) or with § 63.119(d) of this subpart (storage vessel equipped with an external floating roof converted to an internal floating roof), the owner or operator shall comply with the requirements in paragraphs...
Code of Federal Regulations, 2010 CFR
2010-01-01
... performance and safety during reactor operation. Also, in all cases precise control of processes, procedures... elements include equipment that: (1) Normally comes in direct contact with, or directly processes or... pellets; (2) Automatic welding machines especially designed or prepared for welding end caps onto the fuel...
33 CFR 157.138 - Crude Oil Washing Operations and Equipment Manual.
Code of Federal Regulations, 2010 CFR
2010-07-01
... VESSELS CARRYING OIL IN BULK Crude Oil Washing (COW) System on Tank Vessels Design, Equipment, and... 15 of the MARPOL 73/78. (2) A line drawing of the tank vessel's COW system showing the locations of pumps, piping, and COW machines. (3) A description of the COW system. (4) The procedure for the...
33 CFR 156.107 - Alternatives.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Alternatives. 156.107 Section 156....107 Alternatives. (a) The COTP may consider and approve alternative procedures, methods, or equipment... operator submits a written request for the alternative at least 30 days before operations under the...
47 CFR 87.69 - Maintenance tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 87.69 Section 87.69... Operating Requirements and Procedures Operating Requirements § 87.69 Maintenance tests. The licensee may make routine maintenance tests on equipment other than emergency locator transmitters if there is no...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to new work tasks as mobile equipment operators, drilling machine operators, haulage and conveyor... protective measures a miner can take against these hazards, and the contents of the mine's HazCom program... operation in the mine, which require new or different operating procedures. (4) Such other courses as may be...
77 FR 61400 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-09
... military imagery as part of their standard operating procedure. The completed form allows the respondents... and equipment for commercial purposes. The form prescribes processes/standards that have been...
Definition study for an extended manned test of a regenerative life support system
NASA Technical Reports Server (NTRS)
1971-01-01
A program was defined which consists of extended ground-based manned tests of regenerative life support systems. The tests are to evaluate prototypes of advanced life support systems under operational, integrated conditions, thus providing data for the design of efficient environmental control and life support systems for use in long-duration space missions. The requirements are defined for test operations to provide a simulation of an orbiting space laboratory. The features of Phase A and B programs are described. These tests use proven backup equipment to ensure successful evaluation of the advanced subsystems. A pre-tests all-systems checkout period is provided to minimize equipment problems during extended testing and to familiarize all crew and operating staff members with test equipment and procedures.
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2009-01-01
This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.
To Get What You Need--Supply the Facts.
ERIC Educational Resources Information Center
Barr, James E.
1980-01-01
Suggests that business teachers should use formal written proposals, a standard operating procedure in business, to make requests of administration for equipment, supplies, programs, and other needs. (SK)
46 CFR 97.80-1 - Special operating conditions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... exhausts of power-operated industrial trucks shall have adequate ventilation. The senior deck officer shall... which persons are working, by persons acquainted with the test equipment and procedure. The carbon monoxide concentration in the holds and intermediate decks where persons are working shall be maintained at...
The purpose of this SOP is to detail the operation and maintenance of the deionized water still during the Arizona NHEXAS project and the Border study. Keywords: lab; equipment; water still.
The U.S.-Mexico Border Program is sponsored by the Environmental Health Workgroup of t...
Software System Architecture Modeling Methodology for Naval Gun Weapon Systems
2010-12-01
Weapon System HAR Hazard Action Report HERO Hazards of Electromagnetic Radiation to Ordnance IOC Initial Operational Capability... radiation to ordnance ; and combinations therein. Equipment, systems, or procedures and processes whose malfunction would hazard the safe manufacturing...NDI Non-Development Item OPEVAL Operational Evaluation ORDALTS Ordnance Alterations O&SHA Operating and Support Hazard Analysis PDA
The purpose of this SOP is to define the steps needed to operate the data scanners that were used during the Arizona NHEXAS project and the "Border" study. Keywords: data; equipment; scanner.
The National Human Exposure Assessment Survey (NHEXAS) is a federal interagency resear...
ERIC Educational Resources Information Center
New Jersey State Dept. of Environmental Protection, Trenton. Bureau of Air Pollution Control.
This workbook has been prepared for use by persons charged with the burning of fuels and waste products in the State of New Jersey. It is written for building superintendents, custodians, porters, handymen and operating engineers of public, apartment, commercial and office buildings. The manual emphasizes operating procedures that will help meet…
Code of Federal Regulations, 2013 CFR
2013-07-01
..., definitions of Hazardous cargo, materials, substance or atmosphere and Ro-Ro operations). 1918.94 Section 1918..., materials, substance or atmosphere and Ro-Ro operations). (a) Ventilation with respect to carbon monoxide... employees are working by persons competent in the use of the test equipment and procedures. If operations...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., definitions of Hazardous cargo, materials, substance or atmosphere and Ro-Ro operations). 1918.94 Section 1918..., materials, substance or atmosphere and Ro-Ro operations). (a) Ventilation with respect to carbon monoxide... employees are working by persons competent in the use of the test equipment and procedures. If operations...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., definitions of Hazardous cargo, materials, substance or atmosphere and Ro-Ro operations). 1918.94 Section 1918..., materials, substance or atmosphere and Ro-Ro operations). (a) Ventilation with respect to carbon monoxide... employees are working by persons competent in the use of the test equipment and procedures. If operations...
2017-09-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS TEST AND EVALUATION OF AN IMAGE-MATCHING NAVIGATION SYSTEM FOR A UAS OPERATING IN A GPS-DENIED...INTENTIONALLY LEFT BLANK ii Approved for public release. Distribution is unlimited. TEST AND EVALUATION OF AN IMAGE-MATCHING NAVIGATION SYSTEM FOR A UAS... Evaluation Setup and Procedures 39 4.1 Test Equipment and Data Collection Procedures . . . . . . . . . . . . 39 4.2 Actual Flight Data Collection
Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.
Self-Monitoring Procedures: Basic Parameters for Municipal Effluents. Student Reference Manual.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. The Student Reference Manual provides step-by-step procedures for laboratory application of equipment operating…
USDA-ARS?s Scientific Manuscript database
Introduction: Safety regulations are being drafted for the shell egg industry. Sanitation standard operating procedures are an important precursor to HACCP regulations. Salmonella is the pathogen was most often associated with egg-borne outbreaks. Developing effective sanitation procedures that wil...
The purpose of this SOP is to describe the preparation and assembly of materials and samplers to go into the field for use during the Arizona NHEXAS project and the Border study. Keywords: field; equipment.
The U.S.-Mexico Border Program is sponsored by the Environmental Health...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
... level of training and type of personal protective equipment (PPE) necessary for these members to perform..., including any personal information you provide, are placed in the public docket without change, and may be... review by the members enables them to use operational procedures and equipment in a safe manner to avoid...
30 CFR 57.14219 - Brakeman signals.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Brakeman signals. 57.14219 Section 57.14219... Equipment Safety Practices and Operational Procedures § 57.14219 Brakeman signals. When a train is under the direction of a brakeman and the train operator cannot clearly recognize the brakeman's signals, the train...
30 CFR 57.14219 - Brakeman signals.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Brakeman signals. 57.14219 Section 57.14219... Equipment Safety Practices and Operational Procedures § 57.14219 Brakeman signals. When a train is under the direction of a brakeman and the train operator cannot clearly recognize the brakeman's signals, the train...
30 CFR 56.14213 - Ventilation and shielding for welding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Ventilation and shielding for welding. 56.14213... Equipment Safety Practices and Operational Procedures § 56.14213 Ventilation and shielding for welding. (a) Welding operations shall be shielded when performed at locations where arc flash could be hazardous to...
30 CFR 56.14213 - Ventilation and shielding for welding.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Ventilation and shielding for welding. 56.14213... Equipment Safety Practices and Operational Procedures § 56.14213 Ventilation and shielding for welding. (a) Welding operations shall be shielded when performed at locations where arc flash could be hazardous to...
30 CFR 56.14213 - Ventilation and shielding for welding.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Ventilation and shielding for welding. 56.14213... Equipment Safety Practices and Operational Procedures § 56.14213 Ventilation and shielding for welding. (a) Welding operations shall be shielded when performed at locations where arc flash could be hazardous to...
30 CFR 56.14213 - Ventilation and shielding for welding.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Ventilation and shielding for welding. 56.14213... Equipment Safety Practices and Operational Procedures § 56.14213 Ventilation and shielding for welding. (a) Welding operations shall be shielded when performed at locations where arc flash could be hazardous to...
30 CFR 56.14213 - Ventilation and shielding for welding.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Ventilation and shielding for welding. 56.14213... Equipment Safety Practices and Operational Procedures § 56.14213 Ventilation and shielding for welding. (a) Welding operations shall be shielded when performed at locations where arc flash could be hazardous to...
Food Service: How and What to Plan.
ERIC Educational Resources Information Center
Buchanan, Robert D.
1962-01-01
The effectiveness of food service facilities will be greatly enhanced by--(1) developing operating policies early in the design stage, (2) translating menus and recipes into space, time, amounts, and equipment, (3) arranging kitchen functions and work centers into straight line flow, and (4) evaluation. Operating policies and procedures must be…
30 CFR 57.14219 - Brakeman signals.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Brakeman signals. 57.14219 Section 57.14219... Equipment Safety Practices and Operational Procedures § 57.14219 Brakeman signals. When a train is under the direction of a brakeman and the train operator cannot clearly recognize the brakeman's signals, the train...
30 CFR 57.14219 - Brakeman signals.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Brakeman signals. 57.14219 Section 57.14219... Equipment Safety Practices and Operational Procedures § 57.14219 Brakeman signals. When a train is under the direction of a brakeman and the train operator cannot clearly recognize the brakeman's signals, the train...
30 CFR 57.14219 - Brakeman signals.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Brakeman signals. 57.14219 Section 57.14219... Equipment Safety Practices and Operational Procedures § 57.14219 Brakeman signals. When a train is under the direction of a brakeman and the train operator cannot clearly recognize the brakeman's signals, the train...
Test operations procedure (TOP) 1-2-512 electromagnetic compatibility tests
NASA Astrophysics Data System (ADS)
1995-05-01
This TOP provides guidance for the planning, execution, and reporting of grounding and bonding and electromagnetic compatibility (EMC) tests of electrical, electronic, and electrochemical equipment, subsystems, and systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-09-01
The American Petroleum Institute issued a report on ''Recommended Practices for Safe Drilling of Wells Containing Hydrogen Sulfide.'' The study (RP49) updates a first edition published in September 1974. It provides a solid overview of preventive steps that should be taken to safeguard crew and equipment when drilling through H/sub 2/S zones. Discussions cover personnel training, protective equipment, wellsite layout, rig and well equipment, general rig operations and contingency planning and emergency procedures. This article summarizes the report.
Checklists and Monitoring in the Cockpit: Why Crucial Defenses Sometimes Fail
NASA Technical Reports Server (NTRS)
Dismukes, R. Key; Berman, Ben
2010-01-01
Checklists and monitoring are two essential defenses against equipment failures and pilot errors. Problems with checklist use and pilots failures to monitor adequately have a long history in aviation accidents. This study was conducted to explore why checklists and monitoring sometimes fail to catch errors and equipment malfunctions as intended. Flight crew procedures were observed from the cockpit jumpseat during normal airline operations in order to: 1) collect data on monitoring and checklist use in cockpit operations in typical flight conditions; 2) provide a plausible cognitive account of why deviations from formal checklist and monitoring procedures sometimes occur; 3) lay a foundation for identifying ways to reduce vulnerability to inadvertent checklist and monitoring errors; 4) compare checklist and monitoring execution in normal flights with performance issues uncovered in accident investigations; and 5) suggest ways to improve the effectiveness of checklists and monitoring. Cognitive explanations for deviations from prescribed procedures are provided, along with suggestions for countermeasures for vulnerability to error.
Maximally Expressive Task Modeling
NASA Technical Reports Server (NTRS)
Japp, John; Davis, Elizabeth; Maxwell, Theresa G. (Technical Monitor)
2002-01-01
Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiment activities for the Space Station. The equipment used in these experiments is some of the most complex hardware ever developed by mankind, the information sought by these experiments is at the cutting edge of scientific endeavor, and the procedures for executing the experiments are intricate and exacting. Scheduling is made more difficult by a scarcity of space station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling space station experiment operations calls for a "maximally expressive" modeling schema. Modeling even the simplest of activities cannot be automated; no sensor can be attached to a piece of equipment that can discern how to use that piece of equipment; no camera can quantify how to operate a piece of equipment. Modeling is a human enterprise-both an art and a science. The modeling schema should allow the models to flow from the keyboard of the user as easily as works of literature flowed from the pen of Shakespeare. The Ground Systems Department at the Marshall Space Flight Center has embarked on an effort to develop a new scheduling engine that is highlighted by a maximally expressive modeling schema. This schema, presented in this paper, is a synergy of technological advances and domain-specific innovations.
48 CFR 970.2704-2 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... design or operation of any plants or facilities or specially designed equipment for such plants or... limited copyright license for a period of five years, and, in certain rare cases, specified longer periods...
Laboratory Workhorse: The Analytical Balance.
ERIC Educational Resources Information Center
Clark, Douglas W.
1979-01-01
This report explains the importance of various analytical balances in the water or wastewater laboratory. Stressed is the proper procedure for utilizing the equipment as well as the mechanics involved in its operation. (CS)
49 CFR 390.3 - General applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... enterprise; (4) The transportation of human corpses or sick and injured persons; (5) The operation of fire...) Subpart F, Intermodal Equipment Providers, of Part 385, Safety Fitness Procedures. (2) Part 386, Rules of...
NASA Technical Reports Server (NTRS)
Maurino, Daniel; Galotti, Vincent
1994-01-01
It is appropriate here to repeat the analogy described in the introduction to this paper which is that: The consideration of human factors requirements during the design stage of advanced, new technology systems may be seen as resting over a three-legged stool. The first leg, the equipment that a system will utilize to achieve its goals, has traditionally attracted ergonomic considerations associated with equipment design, usually centered around 'knobs and dials.' Lately, this view has expanded to include the so-called other important aspect of Human Factor's study which deals with the cognitive, behaviorial and social processes of the human operators. Study in this area must be furthered. The second leg of the stool, the procedures to operate the equipment, however, has been largely unaddressed. Procedures are not inherent to equipment, but must be developed. The importance of proper human factors consideration in the design of procedures can not be overstated. Lastly, the third leg of the stool, the certification of personnel who will operate the equipment, is very much underway, but far from being complete. The real quest now, however, is to integrate these three legs into an indivisible one. Finally, and most importantly, this workshop and its topic are extremely timely in that we are at the dawn of the most ambitious development ever undertaken in international civil aviation. This would allow us the rather unique opportunity to put theory into practice in the near future by ensuring that the concepts developed and furthered by this workshop and the follow-up are implemented in the design and certification of the ICAO future CNS/ATM systems described earlier in this paper. Now is the time to incorporate human factors requirements during the certification processes of these systems. This might act as a test to the feasibility of these ideas. Such endeavors represent a challenge for the research, engineering, training, operational and regulatory communities. But there is certainly more to be gained by attempting to meet the challenge rather than refraining from progress by decrying the difficulties involved.
Shelton, Larry R.
1994-01-01
The U.S. Geological Survey's National Water-Quality Assessment program includes extensive data- collection efforts to assess the quality of the Nations's streams. These studies require analyses of stream samples for major ions, nutrients, sediments, and organic contaminants. For the information to be comparable among studies in different parts of the Nation, consistent procedures specifically designed to produce uncontaminated samples for trace analysis in the laboratory are critical. This field guide describes the standard procedures for collecting and processing samples for major ions, nutrients, organic contaminants, sediment, and field analyses of conductivity, pH, alkalinity, and dissolved oxygen. Samples are collected and processed using modified and newly designed equipment made of Teflon to avoid contamination, including nonmetallic samplers (D-77 and DH-81) and a Teflon sample splitter. Field solid-phase extraction procedures developed to process samples for organic constituent analyses produce an extracted sample with stabilized compounds for more accurate results. Improvements to standard operational procedures include the use of processing chambers and capsule filtering systems. A modified collecting and processing procedure for organic carbon is designed to avoid contamination from equipment cleaned with methanol. Quality assurance is maintained by strict collecting and processing procedures, replicate sampling, equipment blank samples, and a rigid cleaning procedure using detergent, hydrochloric acid, and methanol.
The purpose of this SOP is to define the steps needed to operate the data scanners that were used during the Arizona NHEXAS project and the Border study. Keywords: data; equipment; scanner.
The U.S.-Mexico Border Program is sponsored by the Environmental Health Workgroup of the...
The purpose of this SOP is to define the steps needed to operate the light pens, and verify the values produced by light pens used in the Arizona NHEXAS project and the "Border" study. Keywords: data; equipment; light pens.
The National Human Exposure Assessment Survey (NHEXAS)...
9 CFR 354.243 - Operations and procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) The floors in the eviscerating room shall be kept clean and reasonably dry during eviscerating... handling equipment shall wear clean garments and should wear caps or hair nets, and shall keep their hands...
The IHS diagnostic X-ray equipment radiation protection program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knapp, A.; Byrns, G.; Suleiman, O.
The Indian Health Service (IHS) operates or contracts with Tribal groups to operate 50 hospitals and approximately 165 primary ambulatory care centers. These facilities contain approximately 275 medical and 800 dental diagnostic x-ray machines. IHS environmental health personnel in collaboration with the Food and Drug Administration's (FDA) Center for Devices and Radiological Health (CDRH) developed a diagnostic x-ray protection program including standard survey procedures and menu-driven calculations software. Important features of the program include the evaluation of equipment performance collection of average patient entrance skin exposure (ESE) measurements for selected procedures, and quality assurance. The ESE data, collected using themore » National Evaluation of X-ray Trends (NEXT) protocol, will be presented. The IHS Diagnostic X-ray Radiation Protection Program is dynamic and is adapting to changes in technology and workload.« less
STS-111 Expedition Five Crew Training Clip
NASA Technical Reports Server (NTRS)
2002-01-01
The STS-111 Expedition Five Crew begins with training on payload operations. Flight Engineer Peggy Whitson and Mission Specialist Sandy Magnus are shown in Shuttle Remote Manipulator System (SRMS) procedures. Flight Engineer Sergei Treschev gets suited for Neutral Neutral Buoyancy Lab (NBL) training. Virtual Reality lab training is shown with Peggy Whitson. Habitation Equipment and procedures are also presented.
NASA Astrophysics Data System (ADS)
Lee, C. H.; Cho, J. H.; Park, S. J.; Kim, J. S.; On, Y. K.; Huh, J.
2015-10-01
The purpose of this study was to measure the radiation exposure to operator and patient during cardiac electrophysiology study, radiofrequency catheter ablation and cardiac device implantation procedures and to calculate the allowable number of cases per year. We carried out 9 electrophysiology studies, 40 radiofrequency catheter ablation and 11 cardiac device implantation procedures. To measure occupational radiation dose and dose-area product (DAP), 13 photoluminescence glass dosimeters were placed at eyes (inside and outside lead glass), thyroids (inside and outside thyroid collar), chest (inside and outside lead apron), wrists, genital of the operator (inside lead apron), and 6 of photoluminescence glass dosimeters were placed at eyes, thyroids, chest and genital of the patient. Exposure time and DAP values were 11.7 ± 11.8 min and 23.2 ± 26.2 Gy cm2 for electrophysiology study; 36.5 ± 42.1 min and 822.4 ± 125.5 Gy cm2 for radiofrequency catheter ablation; 16.2 ± 9.3 min and 27.8 ± 16.5 Gy cm2 for cardiac device implantation procedure, prospectively. 4591 electrophysiology studies can be conducted within the occupational exposure limit for the eyes (150 mSv), and 658-electrophysiology studies with radiofrequency catheter ablation can be carried out within the occupational exposure limit for the hands (500 mSv). 1654 cardiac device implantation procedure can be conducted within the occupational exposure limit for the eyes (150 mSv). The amounts of the operator and patient's radiation exposure were comparatively small. So, electrophysiology study, radio frequency catheter ablation and cardiac device implantation procedures are safe when performed with modern equipment and optimized protective radiation protect equipment.
NASA Astrophysics Data System (ADS)
Gao, Jie; Zheng, Jianrong; Zhao, Yinghui
2017-08-01
With the rapid development of LNG vehicle in China, the operator's training and assessment of the operating skills cannot operate on material objects, because of Vehicle Gas Cylinder's high pressure, flammable and explosive characteristics. LNG Vehicle Gas Cylinder's filling simulation system with semi-physical simulation technology presents the overall design and procedures of the simulation system, and elaborates the realization of the practical analog machine, data acquisition and control system and the computer software, and introduces the design process of equipment simulation model in detail. According to the designed assessment system of the Vehicle Gas Cylinder, it can obtain the operation on the actual cylinder filling and visual effects for the operator, and automatically record operation, the results of real operation with its software, and achieve the operators' training and assessment of operating skills on mobile special equipment.
NASA Astrophysics Data System (ADS)
Tajedi, Noor Aqilah A.; Sukor, Nur Sabahiah A.; Ismail, Mohd Ashraf M.; Shamsudin, Shahrul A.
2017-10-01
The purpose of this paper is to compare the fire evacuation plan and preparation at the underground train stations in the different countries. The methodology for this study was using the extended questionnaire survey to investigate the Rapid Rail Sdn Bhd, Malaysia's fire safety plan and preparation at the underground train stations. There were four sections in the questionnaire which included (i) background of the respondents, (ii) the details on the train stations, safety instruction and fire evacuation exercises (iii) technical systems, installation and equipment at the underground stations and (iv) procedures and technical changes related to fire safety that had been applied by the operators. Previously, the respondents from the different train operator services in the developed countries had completed the questionnaires. This paper extends the response from the Rapid Rail Sdn Bhd to compare the emergency procedures and preparation for fire event with the developed countries. As a result, this study found that the equipment and facilities that provided at the underground train stations that operated by Rapid Rail are relevant for fire safety procedures and needs. The main advantage for Rapid Rail is the underground stations were designed with two or more entrances/exits that may perform better evacuation compare to one main entrance/exit train stations in the other developed countries.
NASA Technical Reports Server (NTRS)
1973-01-01
Information required to calibrate, functionally check, and operate the Instrumentation Branch equipment on the NASA-6 aircraft is provided. All procedures required for preflight checks and in-flight operation of the NASA-6 atmospheric measuring station are given. The calibration section is intended for only that portion of the system maintained and calibrated by IN-MSD-12 Systems Operation contractor personnel. Maintenance is not included.
Sprung, Charles L; Kesecioglu, Jozef
2010-04-01
To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on essential equipment, pharmaceuticals and supplies. Based on a literature review and expert opinion, a Delphi process was used to define the essential topics including essential equipment, pharmaceuticals and supplies. Key recommendations include: (1) ensure that adequate essential medical equipment, pharmaceuticals and important supplies are available during a disaster; (2) develop a communication and coordination system between health care facilities and local/regional/state/country governmental authorities for the provision of additional support; (3) determine the required resources, order and stockpile adequate resources, and judiciously distribute them; (4) acquire additional mechanical ventilators that are portable, provide adequate gas exchange for a range of clinical conditions, function with low-flow oxygen and without high pressure, and are safe for patients and staff; (5) provide advanced ventilatory support and rescue therapies including high levels of inspired oxygen and positive end-expiratory pressure, volume and pressure control ventilation, inhaled nitric oxide, high-frequency ventilation, prone positioning ventilation and extracorporeal membrane oxygenation; (6) triage scarce resources including equipment, pharmaceuticals and supplies based on those who are likely to benefit most or on a 'first come, first served' basis. Judicious planning and adoption of protocols for providing adequate equipment, pharmaceuticals and supplies are necessary to optimize outcomes during a pandemic.
33 CFR Appendix B to Part 273 - Information Requirements for Aquatic Plant Control Program Reports
Code of Federal Regulations, 2012 CFR
2012-07-01
... identification by common and scientific name of the plant or plants concerned, origin of infestation and likely... control operations or engineering works, including control methods, materials, equipment and procedures... operation control, the report should include a brief statement of the special problems in control methods...
33 CFR Appendix B to Part 273 - Information Requirements for Aquatic Plant Control Program Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
... identification by common and scientific name of the plant or plants concerned, origin of infestation and likely... control operations or engineering works, including control methods, materials, equipment and procedures... operation control, the report should include a brief statement of the special problems in control methods...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
30 CFR 56.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Conveyor start-up warnings. 56.14201 Section 56... Equipment Safety Practices and Operational Procedures § 56.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 57.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Conveyor start-up warnings. 57.14201 Section 57... Equipment Safety Practices and Operational Procedures § 57.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 57.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Conveyor start-up warnings. 57.14201 Section 57... Equipment Safety Practices and Operational Procedures § 57.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 57.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Conveyor start-up warnings. 57.14201 Section 57... Equipment Safety Practices and Operational Procedures § 57.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 57.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Conveyor start-up warnings. 57.14201 Section 57... Equipment Safety Practices and Operational Procedures § 57.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 56.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Conveyor start-up warnings. 56.14201 Section 56... Equipment Safety Practices and Operational Procedures § 56.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 56.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Conveyor start-up warnings. 56.14201 Section 56... Equipment Safety Practices and Operational Procedures § 56.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 56.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Conveyor start-up warnings. 56.14201 Section 56... Equipment Safety Practices and Operational Procedures § 56.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 57.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Conveyor start-up warnings. 57.14201 Section 57... Equipment Safety Practices and Operational Procedures § 57.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
30 CFR 56.14201 - Conveyor start-up warnings.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Conveyor start-up warnings. 56.14201 Section 56... Equipment Safety Practices and Operational Procedures § 56.14201 Conveyor start-up warnings. (a) When the... audible warning shall be installed and operated to warn persons that the conveyor will be started. Within...
Performance of advanced trauma life support procedures in microgravity
NASA Technical Reports Server (NTRS)
Campbell, Mark R.; Billica, Roger D.; Johnston, Smith L 3rd; Muller, Matthew S.
2002-01-01
BACKGROUND: Medical operations on the International Space Station will emphasize the stabilization and transport of critically injured personnel and so will need to be capable of advanced trauma life support (ATLS). METHODS: We evaluated the ATLS invasive procedures in the microgravity environment of parabolic flight using a porcine animal model. Included in the procedures evaluated were artificial ventilation, intravenous infusion, laceration closure, tracheostomy, Foley catheter drainage, chest tube insertion, peritoneal lavage, and the use of telemedicine methods for procedural direction. RESULTS: Artificial ventilation was performed and appeared to be unaltered from the 1-G environment. Intravenous infusion, laceration closure, percutaneous dilational tracheostomy, and Foley catheter drainage were achieved without difficulty. Chest tube insertion and drainage were performed with no more difficulty than in the 1-G environment due to the ability to restrain patient, operator and supplies. A Heimlich valve and Sorenson drainage system were both used to provide for chest tube drainage collection with minimal equipment, without the risk of atmospheric contamination, and with the capability to auto-transfuse blood drained from a hemothorax. The use of telemedicine in chest tube insertion was demonstrated to be useful and feasible. Peritoneal lavage using a percutaneous technique, although requiring less training to perform, was found to be dangerous in weightlessness due to the additional pressure of the bowel on the anterior abdominal wall creating a high risk of bowel perforation. CONCLUSIONS: The performance of ATLS procedures in microgravity appears to be feasible with the exception of diagnostic peritoneal lavage. Minor modifications to equipment and techniques are required in microgravity to effect surgical drainage in the presence of altered fluid dynamics, to prevent atmospheric contamination, and to provide for the restraint requirements. A parabolic simulation system was developed for equipment and procedure verification, physiological research, and possible crew medical officer training in the future.
Laminar-airflow equipment certification: what the pharmacist needs to know.
Bryan, D; Marback, R C
1984-07-01
The basic information pharmacy practitioners need to determine the suitability and applicability of laminar-airflow equipment test standards and procedures is presented. The operative guideline for any laminar-flow clean bench (LFCB) certification is the cleanroom and work station requirements for controlled environments as defined by the federal government under Federal Standard 209b (FS 209b). FS 209b outlines the tests, test procedures, and acceptable performance ranges for all LFCB equipment. National Sanitation Foundation Standard Number 49 (NSF 49) is used in the certification of biological-safety cabinets (BSCs). NSF 49 covers those aspects of safety, maintenance, performance, and testing that are unique BSCs. To monitor certification properly, practitioners should be familiar with these standards and the air-velocity profile, high-efficiency particulate air filter performance, noise output, light, and electrical test procedures. A review of the requisite knowledge, experience, and reputation of certifying agents is presented, along with an outline of all the necessary procedures, equipment, and documentation to be used in the process. A thorough test report should be issued upon unit certification. As pharmacy practitioners are responsible for all other aspects of quality assurance, they should also be capable of auditing these certifications to ensure the aseptic quality of products compounded in the laminar-airflow environment.
Colling Wipe Samples for VX Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koester, C; Hoppes, W G
2010-02-11
This standard operating procedure (SOP) provides uniform procedures for the collection of wipe samples of VX residues from surfaces. Personnel may use this procedure to collect and handle wipe samples in the field. Various surfaces, including building materials (wood, metal, tile, vinyl, etc.) and equipment, may be sampled based on this procedure. The purpose of such sampling is to determine whether or not the relevant surfaces are contaminated, to determine the extent of their contamination, to evaluate the effectiveness of decontamination procedures, and to determine the amount of contaminant that might present as a contact hazard.
Electrical safety during transplantation.
Amicucci, G L; Di Lollo, L; Fiamingo, F; Mazzocchi, V; Platania, G; Ranieri, D; Razzano, R; Camin, G; Sebastiani, G; Gentile, P
2010-01-01
Technologic innovations enable management of medical equipment and power supply systems, with improvements that can affect the technical aspects, economics, and quality of medical service. Herein are outlined some technical guidelines, proposed by Istituto Superiore per la Prevenzione e la Sicurezza del Lavoro, for increasing the effectiveness of the power supply system and the safety of patients and surgeons in the operating room, with particular focus on transplantation. The dependence of diagnoses and therapies on operation of the electrical equipment can potentially cause great risk to patients. Moreover, it is possible that faulty electrical equipment could produce current that may flow through the patient. Because patients are particularly vulnerable when their natural protection is considerably decreased, as during transplantation or other surgery, power supply systems must operate with a high degree of reliability and quality to prevent risk, and must be designed to reduce hazards from direct and indirect contact. Reliability of the power supply system is closely related to the quality of the project, choice of materials, and management of the system (eg, quality and frequency of servicing). Among the proposed guidelines, other than normal referencing, are (1) adoption of a monitoring system to improve the quality of the electrical parameters in the operating room, (2) institution of emergency procedures for management of electrical faults, (3) a procedure for management of fires in the operating room, (4) and maintenance interventions and inspections of medical devices to maintain minimal requirements of safety and performance. Copyright 2010 Elsevier Inc. All rights reserved.
Operational NDT simulator, towards human factors integration in simulated probability of detection
NASA Astrophysics Data System (ADS)
Rodat, Damien; Guibert, Frank; Dominguez, Nicolas; Calmon, Pierre
2017-02-01
In the aeronautic industry, the performance demonstration of Non-Destructive Testing (NDT) procedures relies on Probability Of Detection (POD) analyses. This statistical approach measures the ability of the procedure to detect a flaw with regard to one of its characteristic dimensions. The inspection chain is evaluated as a whole, including equipment configuration, probe effciency but also operator manipulations. Traditionally, a POD study requires an expensive campaign during which several operators apply the procedure on a large set of representative samples. Recently, new perspectives for the POD estimation have been introduced using NDT simulation to generate data. However, these approaches do not offer straightforward solutions to take the operator into account. The simulation of human factors, including cognitive aspects, often raises questions. To address these diffculties, we propose a concept of operational NDT simulator [1]. This work presents the first steps in the implementation of such simulator for ultrasound phased array inspection of composite parts containing Flat Bottom Holes (FBHs). The final system will look like a classical ultrasound testing equipment with a single exception: the displayed signals will be synthesized. Our hardware (ultrasound acquisition card, 3D position tracker) and software (position analysis, inspection scenario, synchronization, simulations) environments are developed as a bench to test the meta-modeling techniques able to provide fast-simulated realistic ultra-sound signals. The results presented here are obtained by on-the-fly merging of real and simulated signals. They confirm the feasibility of our approach: the replacement of real signals by purely simulated ones has been unnoticed by operators. We believe this simulator is a great prospect for POD evaluation including human factors, and may also find applications for training or procedure set-up.
Managing the equipment service life in rendering engineering support to NPP operation
NASA Astrophysics Data System (ADS)
Ryasnyy, S. I.
2015-05-01
Apart from subjecting metal to nondestructive testing and determining its actual state, which are the traditional methods used for managing the service life of NPP equipment during its operation, other approaches closely linked with rendering engineering support to NPP operation have emerged in recent decades, which, however, have been covered in publications to a lesser extent. Service life management matters occupy the central place in the structure of engineering support measures. Application of the concept of repairing NPP equipment based on assessing its technical state and the risk of its failure makes it possible to achieve significantly smaller costs for maintenance and repairs and produce a larger amount of electricity due to shorter planned outages. Decreasing the occurrence probability of a process-related abnormality through its prediction is a further development of techniques for monitoring the technical state of equipment and systems. The proposed and implemented procedure for predicting the occurrence of process-related deviations from normal NPP operation opens the possibility to record in the online mode the trends in changes of process parameters that are likely to lead to malfunctions in equipment operation and to reduce the probability of power unit unloading when an abnormal technical state of equipment occurs and develops by recording changes in the state at an early stage and taking timely corrective measures. The article presents the structure of interconnections between the objectives and conditions of adjustment and commissioning tests, in which the management of equipment service life (saving and optimizing the service life) occupies the central place. Special attention is paid to differences in resource saving and optimization measures.
Military applications of emission and susceptibility data
NASA Astrophysics Data System (ADS)
Kohlbacher, Howard; Walker, William
A basic design consideration for new military communications-electronics (C-E) equipment is that it be electromagnetically compatible with the environment in which it will operate. A military standard (MIL-STD-461B) describes the design requirements for the control of the unintentional electromagnetic emission and susceptibility characteristics of electronic equipment and subsystems designed or procured by the US Department of Defense. For new systems which fail the test standards of MIL-STD-461B with regard to radiated susceptibility (RSO3) or radiated emissions (RE02), a decision must be made to fix the new system or to field it without a fix. A procedure to aid in the decision process is outlined. The minimum separation distances required between a failed test system and other C-E equipment in its environment to avoid interference are determined. If this distance is operationally acceptable, the failed unit may be considered to be operationally compatible with its electromagnetic environment.
Commercial jet fuel quality control
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strauss, K.H.
1995-05-01
The paper discusses the purpose of jet fuel quality control between the refinery and the aircraft. It describes fixed equipment, including various types of filters, and the usefulness and limitations of this equipment. Test equipment is reviewed as are various surveillance procedures. These include the Air Transport Association specification ATA 103, the FAA Advisory Circular 150/5230-4, the International Air Transport Association Guidance Material for Fuel Quality Control and Fuelling Service and the Guidelines for Quality Control at Jointly Operated Fuel Systems. Some past and current quality control problems are briefly mentioned.
NASA Astrophysics Data System (ADS)
Baptista, M.; Teles, P.; Cardoso, G.; Vaz, P.
2014-11-01
Over the last decade, there was a substantial increase in the number of interventional cardiology procedures worldwide, and the corresponding ionizing radiation doses for both the medical staff and patients became a subject of concern. Interventional procedures in cardiology are normally very complex, resulting in long exposure times. Also, these interventions require the operator to work near the patient and, consequently, close to the primary X-ray beam. Moreover, due to the scattered radiation from the patient and the equipment, the medical staff is also exposed to a non-uniform radiation field that can lead to a significant exposure of sensitive body organs and tissues, such as the eye lens, the thyroid and the extremities. In order to better understand the spatial variation of the dose and dose rate distributions during an interventional cardiology procedure, the dose distribution around a C-arm fluoroscopic system, in operation in a cardiac cath lab at Portuguese Hospital, was estimated using both Monte Carlo (MC) simulations and dosimetric measurements. To model and simulate the cardiac cath lab, including the fluoroscopic equipment used to execute interventional procedures, the state-of-the-art MC radiation transport code MCNPX 2.7.0 was used. Subsequently, Thermo-Luminescent Detector (TLD) measurements were performed, in order to validate and support the simulation results obtained for the cath lab model. The preliminary results presented in this study reveal that the cardiac cath lab model was successfully validated, taking into account the good agreement between MC calculations and TLD measurements. The simulated results for the isodose curves related to the C-arm fluoroscopic system are also consistent with the dosimetric information provided by the equipment manufacturer (Siemens). The adequacy of the implemented computational model used to simulate complex procedures and map dose distributions around the operator and the medical staff is discussed, in view of the optimization principle (and the associated ALARA objective), one of the pillars of the international system of radiological protection.
46 CFR 11.920 - Subjects for MODU endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineering terminology X X X X X X X Engineering equipment, operations and failures X X X X X X Offshore... X X X X X Mooring equipment X X X X X X Crane use procedures and inspections X X X X X X Medical care: Knowledge and use of: First aid X X X X X X X First response medical action X X X X X X X...
A unique challenge: Emergency egress and life support equipment at KSC
NASA Technical Reports Server (NTRS)
Waddell, H. M., Jr.
1975-01-01
As a result of the investigation following the January 1967 fire, which took the lives of three astronauts, materials were developed, flight hardware was modified, and test procedures were rewritten in order to establish the framework within which a more effective rescue concept could be developed. Topics discussed include breathing units, improved life support equipment, miniresuscitators, and hazardous tasks during space shuttle launch and landing operations.
Improvement of Productivity in TIG Welding Plant by Equipment Design in Orbit
NASA Astrophysics Data System (ADS)
Gnanavel, C.; Saravanan, R.; Chandrasekaran, M.; Jayakanth, J. J.
2017-03-01
Measurements and improvements are very indispensable task at all levels of management. Here some samples are, at operator level: Measuring operating parameters to ensure OEE (Overall Equipment Effectiveness) and measuring Q components performance to ensure quality, at supervisory level: measuring operator’s performance to ensure labour utility at managerial level: production and productivity measurements and at top level capital and capacity utilization. An often accepted statement is “Improvement is impossible without measurement”. Measurements often referred as observation. The case study was conducted at Government Boiler factory in India. The scientific approach followed for indentifying non value added activities. Personalised new equipment designed and installed to achieve productivity improvement of 85% for a day. The new equipment can serve 360o around its axis hence it simplified loading and unloading procedures as well as reduce their times and ensured effective space and time.
Augmented reality building operations tool
Brackney, Larry J.
2014-09-09
A method (700) for providing an augmented reality operations tool to a mobile client (642) positioned in a building (604). The method (700) includes, with a server (660), receiving (720) from the client (642) an augmented reality request for building system equipment (612) managed by an energy management system (EMS) (620). The method (700) includes transmitting (740) a data request for the equipment (612) to the EMS (620) and receiving (750) building management data (634) for the equipment (612). The method (700) includes generating (760) an overlay (656) with an object created based on the building management data (634), which may be sensor data, diagnostic procedures, or the like. The overlay (656) is configured for concurrent display on a display screen (652) of the client (642) with a real-time image of the building equipment (612). The method (700) includes transmitting (770) the overlay (656) to the client (642).
Development of an approach to facilitate optimal equipment replacement.
DOT National Transportation Integrated Search
1999-10-01
The principle objective of this study was to develop a procedure using available departmental data on operation, maintenance and replacement costs to provide the Louisiana Department of Transportation and Development with guidelines for the identific...
Comprehensive review on endonasal endoscopic sinus surgery
Weber, Rainer K.; Hosemann, Werner
2015-01-01
Endonasal endoscopic sinus surgery is the standard procedure for surgery of most paranasal sinus diseases. Appropriate frame conditions provided, the respective procedures are safe and successful. These prerequisites encompass appropriate technical equipment, anatomical oriented surgical technique, proper patient selection, and individually adapted extent of surgery. The range of endonasal sinus operations has dramatically increased during the last 20 years and reaches from partial uncinectomy to pansinus surgery with extended surgery of the frontal (Draf type III), maxillary (grade 3–4, medial maxillectomy, prelacrimal approach) and sphenoid sinus. In addition there are operations outside and beyond the paranasal sinuses. The development of surgical technique is still constantly evolving. This article gives a comprehensive review on the most recent state of the art in endoscopic sinus surgery according to the literature with the following aspects: principles and fundamentals, surgical techniques, indications, outcome, postoperative care, nasal packing and stents, technical equipment. PMID:26770282
Experience reveals ways to minimize failures in rod-pumped wells
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patterson, J.C.; Bucaram, S.M.; Curfew, J.V.
From the experience gained over the past 25 years, ARCO Oil and Gas Co. has developed recommendations to reduce equipment failure in sucker-rod pumping installations. These recommendations include equipment selection and design, operating procedures, and chemical treatment. Equipment failure and its attendant costs are extremely important in today's petroleum industry. Because rod pumping is the predominant means of artificial lift, minimizing equipment failure in rod pumped wells can have a significant impact on profitability. This compilation of recommendations comes from field locations throughout the US and other countries. The goal is to address and solve problems on a well-by-well basis.
NASA Astrophysics Data System (ADS)
Suryono, T. J.; Gofuku, A.
2018-02-01
One of the important thing in the mitigation of accidents in nuclear power plant accidents is time management. The accidents should be resolved as soon as possible in order to prevent the core melting and the release of radioactive material to the environment. In this case, operators should follow the emergency operating procedure related with the accident, in step by step order and in allowable time. Nowadays, the advanced main control rooms are equipped with computer-based procedures (CBPs) which is make it easier for operators to do their tasks of monitoring and controlling the reactor. However, most of the CBPs do not include the time remaining display feature which informs operators of time available for them to execute procedure steps and warns them if the they reach the time limit. Furthermore, the feature will increase the awareness of operators about their current situation in the procedure. This paper investigates this issue. The simplified of emergency operating procedure (EOP) of steam generator tube rupture (SGTR) accident of PWR plant is applied. In addition, the sequence of actions on each step of the procedure is modelled using multilevel flow modelling (MFM) and influenced propagation rule. The prediction of action time on each step is acquired based on similar case accidents and the Support Vector Regression. The derived time will be processed and then displayed on a CBP user interface.
ERIC Educational Resources Information Center
Alberta Advanced Education and Technology, 2007
2007-01-01
The graduate of the Wire Process Operator apprenticeship program is a certified journeyperson who will be able to: (1) be skillful in the fusing of metals using prescribed welding applications; (2) have a working knowledge of the welding equipment involved with the various welding procedures; (3) comprehend drawings; (4) have a thorough knowledge…
Code of Federal Regulations, 2010 CFR
2010-01-01
...: CERTIFICATION AND OPERATIONS CERTIFICATION AND OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE... must be kept low and shielded against shining into the airplane's windows or doors. (2) The airplane... the ground to protect participants. No other equipment that is not part of the airplane's emergency...
Code of Federal Regulations, 2011 CFR
2011-10-01
...” designed and operated to carry out an industrial function at sea. Contemporary U.S. Vessel regulations in... structural designs, industrial equipment and operating procedures incorporated in drilling vessels. To... meet reasonable levels of safety. To this end, the following determinations will be made: • The design...
Code of Federal Regulations, 2014 CFR
2014-10-01
...” designed and operated to carry out an industrial function at sea. Contemporary U.S. Vessel regulations in... structural designs, industrial equipment and operating procedures incorporated in drilling vessels. To... meet reasonable levels of safety. To this end, the following determinations will be made: • The design...
Code of Federal Regulations, 2013 CFR
2013-10-01
...” designed and operated to carry out an industrial function at sea. Contemporary U.S. Vessel regulations in... structural designs, industrial equipment and operating procedures incorporated in drilling vessels. To... meet reasonable levels of safety. To this end, the following determinations will be made: • The design...
Code of Federal Regulations, 2012 CFR
2012-10-01
...” designed and operated to carry out an industrial function at sea. Contemporary U.S. Vessel regulations in... structural designs, industrial equipment and operating procedures incorporated in drilling vessels. To... meet reasonable levels of safety. To this end, the following determinations will be made: • The design...
Code of Federal Regulations, 2010 CFR
2010-10-01
...” designed and operated to carry out an industrial function at sea. Contemporary U.S. Vessel regulations in... structural designs, industrial equipment and operating procedures incorporated in drilling vessels. To... meet reasonable levels of safety. To this end, the following determinations will be made: • The design...
Code of Federal Regulations, 2012 CFR
2012-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2013 CFR
2013-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2011 CFR
2011-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2010 CFR
2010-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2014 CFR
2014-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Time Management in the Operating Room: An Analysis of the Dedicated Minimally Invasive Surgery Suite
Hsiao, Kenneth C.; Machaidze, Zurab
2004-01-01
Background: Dedicated minimally invasive surgery suites are available that contain specialized equipment to facilitate endoscopic surgery. Laparoscopy performed in a general operating room is hampered by the multitude of additional equipment that must be transported into the room. The objective of this study was to compare the preparation times between procedures performed in traditional operating rooms versus dedicated minimally invasive surgery suites to see whether operating room efficiency is improved in the specialized room. Methods: The records of 50 patients who underwent laparoscopic procedures between September 2000 and April 2002 were retrospectively reviewed. Twenty-three patients underwent surgery in a general operating room and 18 patients in an minimally invasive surgery suite. Nine patients were excluded because of cystoscopic procedures undergone prior to laparoscopy. Various time points were recorded from which various time intervals were derived, such as preanesthesia time, anesthesia induction time, and total preparation time. A 2-tailed, unpaired Student t test was used for statistical analysis. Results: The mean preanesthesia time was significantly faster in the minimally invasive surgery suite (12.2 minutes) compared with that in the traditional operating room (17.8 minutes) (P=0.013). Mean anesthesia induction time in the minimally invasive surgery suite (47.5 minutes) was similar to time in the traditional operating room (45.7 minutes) (P=0.734). The average total preparation time for the minimally invasive surgery suite (59.6 minutes) was not significantly faster than that in the general operating room (63.5 minutes) (P=0.481). Conclusion: The amount of time that elapses between the patient entering the room and anesthesia induction is statically shorter in a dedicated minimally invasive surgery suite. Laparoscopic surgery is performed more efficiently in a dedicated minimally invasive surgery suite versus a traditional operating room. PMID:15554269
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wogman, Ned A.; Milbrath, Brian D.; Payne, Rosara F.
This paper is intended to serve as a scientific basis to start discussions of the available environmental sampling techniques and equipment that have been used in the past that could be considered for use within the context of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspections (OSI). This work contains information on the techniques, equipment, costs, and some operational procedures associated with environmental sampling that have actually been used in the past by the United States for the detection of nuclear explosions. This paper also includes a discussion of issues, recommendations, and questions needing further study within the context of themore » sampling and analysis of aquatic materials, atmospheric gases, atmospheric particulates, vegetation, sediments and soils, fauna, and drill-back materials.« less
NASA Technical Reports Server (NTRS)
1978-01-01
Lake To Lake Dairy Cooperative, Manitowoc, Wisconsin, operates four plants in Wisconsin for processing milk, butter and cheese products from its 1,300 member farms. The large co-op was able to realize substantial savings by using NASA information for improved efficiency in plant maintenance. Under contract to Marshall Space Flight Center, Midwest Research Institute compiled a handbook consolidating information about commercially available lubricants. The handbook details chemical and physical properties, applications, specifications, test procedures and test data for liquid and solid lubricants. Lake To Lake's plant engineer used the handbook to effect savings in maintenance labor and materials costs by reducing the number of lubricants used on certain equipment. Strict U.S. Department of Agriculture and Food and Drug Administration regulations preclude lubrication changes n production equipment, but the co-op's maintenance chief was able to eliminate seven types of lubricants for ancillary equipment, such as compressors and high pressure pumps. Handbook data enabled him to select comparable but les expensive lubricants in the materials consolidation process, and simplified lubrication schedules and procedures. The handbook is in continuing use as a reference source when a new item of equipment is purchased.
Bayesian networks for satellite payload testing
NASA Astrophysics Data System (ADS)
Przytula, Krzysztof W.; Hagen, Frank; Yung, Kar
1999-11-01
Satellite payloads are fast increasing in complexity, resulting in commensurate growth in cost of manufacturing and operation. A need exists for a software tool, which would assist engineers in production and operation of satellite systems. We have designed and implemented a software tool, which performs part of this task. The tool aids a test engineer in debugging satellite payloads during system testing. At this stage of satellite integration and testing both the tested payload and the testing equipment represent complicated systems consisting of a very large number of components and devices. When an error is detected during execution of a test procedure, the tool presents to the engineer a ranked list of potential sources of the error and a list of recommended further tests. The engineer decides this on this basis if to perform some of the recommended additional test or replace the suspect component. The tool has been installed in payload testing facility. The tool is based on Bayesian networks, a graphical method of representing uncertainty in terms of probabilistic influences. The Bayesian network was configured using detailed flow diagrams of testing procedures and block diagrams of the payload and testing hardware. The conditional and prior probability values were initially obtained from experts and refined in later stages of design. The Bayesian network provided a very informative model of the payload and testing equipment and inspired many new ideas regarding the future test procedures and testing equipment configurations. The tool is the first step in developing a family of tools for various phases of satellite integration and operation.
The purpose of this SOP is to define the steps needed to operate the light pens, and verify the values produced by light pens used in the Arizona NHEXAS project and the Border study. Keywords: data; equipment; light pens.
The U.S.-Mexico Border Program is sponsored by the Envir...
Implementation of GPS controlled highway construction equipment phase II.
DOT National Transportation Integrated Search
2008-01-01
"During 2006, WisDOT and the Construction Materials and Support Center at UW-Madison worked together to develop : a specification and QC/QA procedures for GPS machine guidance on highway construction grading operations. These : specifications and pro...
Redundancy approaches in bubble domain memories
NASA Technical Reports Server (NTRS)
Almasi, G. S.; Schuster, S. E.
1972-01-01
Fabrication of integrated circuit chips to compensate for faulty memory elements is discussed. Procedure for testing chips to determine extent of redundancy and faults is described. Mathematical model to define operation is presented. Schematic circuit diagram of test equipment is provided.
75 FR 67634 - Parts and Accessories Necessary for Safe Operation: Antilock Brake Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-03
... trailer with an antilock brake system be equipped with an external malfunction indicator lamp. DATES: This... malfunction indicator lamp. FMCSA used the Agency's direct final rule procedures (75 FR 29915, May 28, 2010...
The Army Did Not Fully Document Procedures for Processing Wholesale Equipment in Kuwait
2016-02-24
accountability , integrity, and efficiency; advises the Secretary of Defense and Congress; and informs the public. Vision Our vision is to be a model oversight...property accountability in support of Operation Inherent Resolve. Findings Army Field Support Battalion (AFSBn)–Kuwait generally had effective...established and equipment moving into and out of Camp Arifjan is properly accounted for and maintained. During the audit, we also observed a lack of physical
'Weightless' acrylic painting by Jack Kroehnke
NASA Technical Reports Server (NTRS)
1987-01-01
'Weightless' acrylic painting by Jack Kroehnke depicts STS-26 Discovery, Orbiter Vehicle (OV) 103, Mission Specialist (MS) David C. Hilmers participating in extravehicular activity (EVA) simulation in JSC Weightless Environment Training Facility (WETF) Bldg 29. In the payload bay (PLB) mockup, Hilmers, wearing extravehicular mobility unit (EMU), holds onto the mission-peculiar equipment support structure in foreground while SCUBA-equipped diver monitors activity overhead and camera operator records EVA procedures. Copyrighted art work for use by NASA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grote, R.A.
1991-05-01
The report is a recommended operating procedure (ROP), prepared for use in research activities conducted by EPA's Air and Energy Engineering Research Laboratory (AEERL). The method described is applicable to the stack sampling of flue gas from a rotary kiln and to associated equipment of AEERL's Combustion Research Branch. It has been the standard method of sampling kiln flue gas due to the transient nature of the puff development and its capability to sample the maximum volume over the shortest time period. ROPs describe non-routine or experimental research operations where some judgment in application may be warranted. ROPs may notmore » be applicable to activities conducted by other research groups, and should not be used in place of standard operating procedures. Use of ROPs must be accompanied by an understanding of the purpose and scope. Questions should be directed to the author.« less
[Quality Improvement Project: Increasing the Rate of Proper Use of Infant Transferring Warmers].
Huang, Hsiu-Yu; Fann, Guei-Ling
2015-10-01
Infant-transferring warmers provide a warm environment and emergency care facilities such ventilators for high-risk infants during transport. Accurate use of this warmer has been demonstrated to reduce rates of neonatal complications and increase rates of survival. This project found that, despite the complaints of nurses that warmers occasionally malfunctioned during the transfer process, warmer functions nearly always tested normal after use. Therefore, the researchers surveyed ward nurses to better understand the underlying reasons for these complaints. Results found that only 68.4% of those surveyed operated the warmer correctly. The reasons for improper use were analyzed and categorized as: Nurse-related factors - lack of warmer operating knowledge and experience in the clinic; System-related factors - lack of a standard operating procedure (SOP) and monitor/audit practices and an incomplete training protocol; Equipment-related factors - lack of an equipment preparation SOP and difficulties in setting the ventilator properly. The purpose of this project was to achieve a 100% rate of proper warmer use among nurses. Through continuous clinical education, we created a standard operating procedure for warmer operation, created a video and poster for warmer users, simplified the equipment preparation SOP, and periodically monitored and checked results. After the intervention, 100% of the nurses were able to use the warmers correctly. Additionally, the rate of satisfaction for nursing-warmer use among the participating nurses increased from 51.4% to 80.6%. This project effectively increased the rate for correctly using transferring warmers among participating nurses and improved the quality of medical care.
SRC-I demonstration plant analytical laboratory methods manual. Final technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klusaritz, M.L.; Tewari, K.C.; Tiedge, W.F.
1983-03-01
This manual is a compilation of analytical procedures required for operation of a Solvent-Refined Coal (SRC-I) demonstration or commercial plant. Each method reproduced in full includes a detailed procedure, a list of equipment and reagents, safety precautions, and, where possible, a precision statement. Procedures for the laboratory's environmental and industrial hygiene modules are not included. Required American Society for Testing and Materials (ASTM) methods are cited, and ICRC's suggested modifications to these methods for handling coal-derived products are provided.
Evaluation of noise pollution level in the operating rooms of hospitals: A study in Iran.
Giv, Masoumeh Dorri; Sani, Karim Ghazikhanlou; Alizadeh, Majid; Valinejadi, Ali; Majdabadi, Hesamedin Askari
2017-06-01
Noise pollution in the operating rooms is one of the remaining challenges. Both patients and physicians are exposed to different sound levels during the operative cases, many of which can last for hours. This study aims to evaluate the noise pollution in the operating rooms during different surgical procedures. In this cross-sectional study, sound level in the operating rooms of Hamadan University-affiliated hospitals (totally 10) in Iran during different surgical procedures was measured using B&K sound meter. The gathered data were compared with national and international standards. Statistical analysis was performed using descriptive statistics and one-way ANOVA, t -test, and Pearson's correlation test. Noise pollution level at majority of surgical procedures is higher than national and international documented standards. The highest level of noise pollution is related to orthopedic procedures, and the lowest one related to laparoscopic and heart surgery procedures. The highest and lowest registered sound level during the operation was 93 and 55 dB, respectively. Sound level generated by equipments (69 ± 4.1 dB), trolley movement (66 ± 2.3 dB), and personnel conversations (64 ± 3.9 dB) are the main sources of noise. The noise pollution of operating rooms are higher than available standards. The procedure needs to be corrected for achieving the proper conditions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mirro, G.A.
1997-02-01
This paper presents an overview of issues related to handling NORM materials, and provides a description of a facility designed for the processing of NORM contaminated equipment. With regard to handling NORM materials the author discusses sources of NORM, problems, regulations and disposal options, potential hazards, safety equipment, and issues related to personnel protection. For the facility, the author discusses: description of the permanent facility; the operations of the facility; the license it has for handling specific radioactive material; operating and safety procedures; decontamination facilities on site; NORM waste processing capabilities; and offsite NORM services which are available.
7 CFR 1779.65 - Lender's sale or assignment of the guaranteed portion of loan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... construction, and acquisition of real estate and equipment without the prior written approval of the Agency. If... operating procedures. (c) Minimum retention. The lender is required to hold in its own portfolio or retain a...
14 CFR 121.915 - Continuing qualification curriculum.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., flight training device, flight simulator, or other equipment, as appropriate, on normal, abnormal, and... training in the type flight training device or the type flight simulator, as appropriate, regarding... flight simulators or flight training devices: Training in operational flight procedures and maneuvers...
14 CFR 121.915 - Continuing qualification curriculum.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., flight training device, flight simulator, or other equipment, as appropriate, on normal, abnormal, and... training in the type flight training device or the type flight simulator, as appropriate, regarding... flight simulators or flight training devices: Training in operational flight procedures and maneuvers...
14 CFR 121.915 - Continuing qualification curriculum.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., flight training device, flight simulator, or other equipment, as appropriate, on normal, abnormal, and... training in the type flight training device or the type flight simulator, as appropriate, regarding... flight simulators or flight training devices: Training in operational flight procedures and maneuvers...
Thermal measurements of commuter rail wheels under revenue service conditions
DOT National Transportation Integrated Search
1993-09-01
The report documents the test objective, procedure, and equipment used during the execution of the New Jersey Transit Operational Field Test conducted under the FRA Cracked Wheel Investigation. The report also includes a presentation of all data gath...
Solving Power Tool Problems in the School Shop
ERIC Educational Resources Information Center
Irvin, Daniel W.
1976-01-01
The school shop instructor is largely responsible for the preventive maintenance of power tools. These preventive measures primarily involve proper alignment, good lubrication, a reasonable maintenance program, and good operating procedures. Suggestions for maintenance of specific equipment is provided. (Author/BP)
NASA Astrophysics Data System (ADS)
Mihlan, G. J.; Ungers, L. J.; Smith, R. K.; Mitchell, R. I.; Jones, J. H.
1983-05-01
A preliminary control technology assessment survey was conducted at the facility which manufactures N-channel metal oxide semiconductor (NMOS) integrated circuits. The facility has industrial hygiene review procedures for evaluating all new and existing process equipment. Employees are trained in safety, use of personal protective equipment, and emergency response. Workers potentially exposed to arsenic are monitored for urinary arsenic levels. The facility should be considered a candidate for detailed study based on the diversity of process operations encountered and the use of state-of-the-art technology and process equipment.
The consequences of the economic crisis in radiology.
2015-12-01
The effects of the economic crisis have led to complex problems in radiology. The crisis has led to a reduction in the turnover of imaging equipment. This reflects on the quantity and quality of output, an aspect which is worsened by the contraction of the radiology market, late payments on supplies, and competitive procurement of medical goods centralized on a regional or national level. Many local and national institutions have operated with significant reductions of reimbursement for procedures, forcing a reorganization of facilities, manpower, and equipment. The reduction in operating margins of the industry has resulted in a reduction of invested capital for projects of industrial R&D and direct or indirect sponsorship. The quality of care will be affected with less comfortable conditions, reduction of local availability of radiologists, and failure to invest in lower dose equipment to control population medical radiation exposure. The crisis resulted in a reduction in the number of graduates in medicine and scholarships for specialization induced by linear cuts will result in a drastic reduction of radiological specialists. This will favour the development of teleradiology services, with the risk of accelerating the demedicalisation of radiology departments, and isolation of the professionals. • The economic crisis has led to reduction in the turnover of imaging equipment. • The economic crisis has led to reductions of reimbursement for procedures. • The economic crisis has led to reductions in operating margins of the industry. • The economic crisis has led to contraction of quantity and quality of output. • The economic crisis resulted in demedicalisation of radiology departments and isolation of professionals.
ERIC Educational Resources Information Center
Bernhard, Genore H.
A guide is presented for those unfamiliar with library procedures who wish to organize and operate a small library. Following a discussion of the modern library's role, there is detailed information about library boards, librarians, finance, legal problems, policies, equipment, supplies, and book acquisition and processing. Shelving, filing, book…
Operating and service manual for the NASA Lewis automated far-field antenna range
NASA Technical Reports Server (NTRS)
Terry, John D.
1992-01-01
This NASA Lewis far-field antenna range was recently upgraded and automated to meet the growing and demanding needs of the satellite communications program. Here, assistance is offered in the operation and service of this range. The procedures for configuring the test hardware and for operating the Far-Field Antenna Measurement Program (FAMP) are given. Included are the steps for getting started and for installing the proper microwave equipment.
Schmidt, Georg
Today, healthcare facilities are highly dependent on the private sector to keep their medical equipment functioning. Moreover, private sector involvement becomes particularly important for the supply of spare parts and consumables. However, in times of armed conflict, the capacity of the corporate world appears to be seriously hindered. Subsequently, this study researches the influence of armed conflict on the private medical equipment sector. This study follows a qualitative approach by conducting 19 interviews with representatives of the corporate world in an active conflict zone. A semistructured interview guide, consisting of 10 questions, was used to examine the constraints of this sector. The results reveal that the lack of skilled personnel, complicated importation procedures, and a decrease in financial capacity are the major constraints faced by private companies dealing in medical equipment in conflict zones. Even when no official sanctions and embargoes for medical items exist, constraints for trading medical equipment are clearly recognizable. Countries at war would benefit from a centralized structure that deals with the importation procedures for medical items, to assist local companies in their purchasing procedures. A high degree of adaption is needed to continue operating, despite the emerging constraints of armed conflict. Future studies might research the constraints for manufacturers outside the conflict to export medical items to the country of war.
Construction of a high-tech operating room for image-guided surgery using VR.
Suzuki, Naoki; Hattori, Asaki; Suzuki, Shigeyuki; Otake, Yoshito; Hayashibe, Mitsuhiro; Kobayashi, Susumu; Nezu, Takehiko; Sakai, Haruo; Umezawa, Yuji
2005-01-01
This project aimed to construct an operating room to implement high dimensional (3D, 4D) medical imaging and medical virtual reality techniques that would enable clinical tests for new surgical procedures. We designed and constructed such an operating room at Dai-san Hospital, the Jikei Univ. School of Medicine, Tokyo, Japan. The room was equipped with various facilities for image-guided, robot and tele- surgery. In this report, we describe an outline of our "high-tech operating room" and future plans.
Eye dose to staff involved in interventional and procedural fluoroscopy
NASA Astrophysics Data System (ADS)
McLean, D.; Hadaya, D.; Tse, J.
2016-03-01
In 2011 the International Commission on Radiological Protection (ICRP) lowered the occupational eye dose limit from 150 to 20 mSv/yr [1]. While international jurisdictions are in a process of adopting these substantial changes, medical physicists at the clinical level have been advising medical colleagues on specific situations based on dose measurements. Commissioned and calibrated TLDs mounted in commercially available holders designed to simulate the measurement of Hp(3), were applied to staff involved in x-ray procedures for a one month period. During this period clinical procedure data was concurrently collected and subject to audit. The use or not of eye personal protective equipment (PPE) was noted for all staff. Audits were conducted in the cardiac catheterisation laboratory, the interventional angiography rooms and the procedural room where endoscopic retrograde cholangiopancreatography (ERCP) procedures are performed. Significant levels of occupational dose were recorded in the cardiac and interventional procedures, with maximum reading exceeding the new limit for some interventional radiologists. No significant eye doses were measured for staff performing ERCP procedures. One outcome of the studies was increased use of eye PPE for operators of interventional equipment with increased availability also to nursing staff, when standing in close proximity to the patient during procedures.
NASA Technical Reports Server (NTRS)
Erickson, E. F.; Goorvitch, D.; Dix, M. G.; Hitchman, M. J.
1974-01-01
The telescope system was designed as a multi-user facility for observations of celestial objects at infrared wavelengths, where ground-based observations are difficult or impossible due to the effects of telluric atmospheric absorption. The telescope is mounted in a Lear jet model 24B which typically permits 70 min. of observing per flight at altitudes in excess of 45,000 ft (13 km). Telescope system installation is discussed, along with appropriate setup and adjustment procedures. Operation of the guidance system is also explained, and checklists are provided which pertain to the recommended safe operating and in-flight trouble-shooting procedures for the equipment.
Method and system for controlling a gasification or partial oxidation process
Rozelle, Peter L; Der, Victor K
2015-02-10
A method and system for controlling a fuel gasification system includes optimizing a conversion of solid components in the fuel to gaseous fuel components, controlling the flux of solids entrained in the product gas through equipment downstream of the gasifier, and maximizing the overall efficiencies of processes utilizing gasification. A combination of models, when utilized together, can be integrated with existing plant control systems and operating procedures and employed to develop new control systems and operating procedures. Such an approach is further applicable to gasification systems that utilize both dry feed and slurry feed.
The design of digital-adaptive controllers for VTOL aircraft
NASA Technical Reports Server (NTRS)
Stengel, R. F.; Broussard, J. R.; Berry, P. W.
1976-01-01
Design procedures for VTOL automatic control systems have been developed and are presented. Using linear-optimal estimation and control techniques as a starting point, digital-adaptive control laws have been designed for the VALT Research Aircraft, a tandem-rotor helicopter which is equipped for fully automatic flight in terminal area operations. These control laws are designed to interface with velocity-command and attitude-command guidance logic, which could be used in short-haul VTOL operations. Developments reported here include new algorithms for designing non-zero-set-point digital regulators, design procedures for rate-limited systems, and algorithms for dynamic control trim setting.
Operations Nomenclature [Annexes
NASA Technical Reports Server (NTRS)
Shannon, Yvette Y.
2011-01-01
The purpose of Operations Nomenclature (OpNom) is to document methods for denoting all hardware and software and associated data referenced by operations products produced by the International Space Station (ISS) operations community. This includes Operations Data File (ODF) procedures, ground and onboard displays, mission rules, commands, messages and advisories, planning products, etc. This document applies to all agencies and individuals participating in or contributing to ISS mission operations. Mission operations include ground checkout, training, and simulations, as well as real-time activities. The document also applies to all operations documentation (paper or electronic media) and other products that refer to ISS-related equipment or activities.
1976-07-01
Systems Division ......... ........................ 60 Oceanology Area ........... ............................ 62 Shipboard Computing Group...directed toward new and improved materials, equipment, techniques, systems , and related operational procedures for the Navy. In fulfillment of this...Within areas of technological expertise, develops prototype systems applicable to specific projects. (d) Performs scientific research development for
ERIC Educational Resources Information Center
Nesin, Gert; Barrow, Lloyd H.
1984-01-01
Describes a fourth-grade unit on density which introduces a concept useful in the study of chemistry and procedures appropriate to the chemistry laboratory. The hands-on activities, which use simple equipment and household substances, are at the level of thinking Piaget describes as concrete operational. (BC)
40 CFR 1065.920 - PEMS calibrations and verifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... that your new configuration meets this verification. The verification consists of operating an engine... with data simultaneously generated and recorded by laboratory equipment as follows: (1) Mount an engine...
40 CFR 1065.920 - PEMS calibrations and verifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... that your new configuration meets this verification. The verification consists of operating an engine... with data simultaneously generated and recorded by laboratory equipment as follows: (1) Mount an engine...
40 CFR 1065.920 - PEMS calibrations and verifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... that your new configuration meets this verification. The verification consists of operating an engine... with data simultaneously generated and recorded by laboratory equipment as follows: (1) Mount an engine...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2012 CFR
2012-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2014 CFR
2014-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2013 CFR
2013-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
Spectrophotometric Titration of a Mixture of Calcium and Magnesium.
ERIC Educational Resources Information Center
Fulton, Robert; And Others
1986-01-01
Describes a spectrophotometric titration experiment which uses a manual titration spectrophotometer and manually operated buret, rather than special instrumentation. Identifies the equipment, materials, and procedures needed for the completion of the experiment. Recommends the use of this experiment in introductory quantitative analysis…
Code of Federal Regulations, 2012 CFR
2012-07-01
... procedures and equipment specified in subpart F of this part. In the case of dual-fuel engines, measure emissions when operating with each type of fuel for which you intend to certify the engine. In the case of flexible-fuel engines, measure emissions when operating with the fuel mixture that is most likely to cause...
Code of Federal Regulations, 2013 CFR
2013-07-01
... procedures and equipment specified in subpart F of this part. In the case of dual-fuel engines, measure emissions when operating with each type of fuel for which you intend to certify the engine. In the case of flexible-fuel engines, measure emissions when operating with the fuel mixture that is most likely to cause...
Code of Federal Regulations, 2010 CFR
2010-07-01
... procedures and equipment specified in subpart F of this part. In the case of dual-fuel engines, measure emissions when operating with each type of fuel for which you intend to certify the engine. In the case of flexible-fuel engines, measure emissions when operating with the fuel mixture that is most likely to cause...
Code of Federal Regulations, 2011 CFR
2011-07-01
... procedures and equipment specified in subpart F of this part. In the case of dual-fuel engines, measure emissions when operating with each type of fuel for which you intend to certify the engine. In the case of flexible-fuel engines, measure emissions when operating with the fuel mixture that is most likely to cause...
Code of Federal Regulations, 2014 CFR
2014-07-01
... procedures and equipment specified in subpart F of this part. In the case of dual-fuel engines, measure emissions when operating with each type of fuel for which you intend to certify the engine. In the case of flexible-fuel engines, measure emissions when operating with the fuel mixture that is most likely to cause...
Risks and injuries in laser and high-frequency applications
NASA Astrophysics Data System (ADS)
Giering, K.; Philipp, Carsten M.; Berlien, Hans-Peter
1995-01-01
An analysis of injuries and risks using high frequency (HF) and lasers in medicine based on a literature search with MEDLINE was performed. The cases reported in the literature were classified according to the following criteria: (1) Avoidable in an optimal operational procedure. These kind of injuries are caused by a chain of unfortunate incidents. They are in principle avoidable by the 'right action at the right time' which presupposes an appropriate training of the operating team, selection of the optimal parameters for procedure and consideration of all safety instructions. (2) Avoidable, caused by malfunction of the equipment and/or accessories. The injuries classified into this group are avoidable if all safety regulations were fulfilled. This includes a pre-operational check-up and the use of medical lasers and high frequency devices only which meet the international safety standards. (3) Avoidable, caused by misuse/mistake. Injuries of this group were caused by an inappropriate selection of the procedure, wrong medical indication or mistakes during application. (4) Unavoidable, fateful. These injuries can be caused by risks inherent to the type of energy used, malfunction of the equipment and/or accessories though a pre-operational check-up was done. Some risks and complications are common to high frequency and laser application. But whereas these risks can be excluded easily in laser surgery there is often a great expenditure necessary or they are not avoidable if high frequency if used. No unavoidable risks due to laser energy occur.
DOE Office of Scientific and Technical Information (OSTI.GOV)
WHITE, W.F.
2000-04-04
The purpose of this document is to provide the definition and means of maintaining the safety envelope (SE) for the Emergency Notification and Evacuation System (ENES). Together with the appendices, it provides: (1) The system requirements for determining system operability (Section 3.0); (2) Evaluations of equipment to determine the safety boundary for the system (Section 4.0); (3) List of system drawings that are annotated to show the SE boundaries (Appendix A); (4) Identification of the SE equipment by reference to systems and drawings (Appendix B); (5) Requirements for the individual SE equipment (Section 4.0); and (6) A list of themore » operational and surveillance procedures necessary to operate and maintain the system equipment within the SE (Sections 5.0 and 6.0). The Private Automatic Exchange (PAX) phones and PAX switchers are outside the safety envelope defined in WHC-SD-CP-OSR-010, Section 5.4.10, ''Safety Communication and Alarm Systems,'' Section 5.4.1 0.1, ''Major Components and Operating Characteristics,'' and Section 5.4.10.1.12, ''PAX System.'' The PAX override microphone system maintains the safety envelope, and functions as a backup to the evacuation sirens during an emergency.« less
Standardization of carbon-phenolic composite test methodology
NASA Technical Reports Server (NTRS)
Hall, W. B.
1986-01-01
The objective of this study was to evaluate the residual volatiles, filler content, and resin flow test procedures for carbon-phenolic prepreg materials. The residual volatile test procedure was rewritten with tighter procedure control which was then evaluated by round robin testing by four laboratories on the same rolls of prepreg. Results indicated that the residual volatiles test was too operator and equipment dependent to be reliable, and it was recommended that the test be discontinued. The resin flow test procedures were rewritten with tighter procedure control, and it is now considered to be an acceptable test. It was recommended that the filler content determination be made prior to prepregging.
Hellinger, Walter C; Hasan, Saiyid A; Bacalis, Laura P; Thornblom, Deborah M; Beckmann, Susan C; Blackmore, Carina; Forster, Terri S; Tirey, Jason F; Ross, Mary J; Nilson, Christian D; Mamalis, Nick; Crook, Julia E; Bendel, Rick E; Shetty, Rajesh; Stewart, Michael W; Bolling, James P; Edelhauser, Henry F
2006-03-01
Toxic anterior segment syndrome (TASS), a complication of cataract surgery, is a sterile inflammation of the anterior chamber of the eye. An outbreak of TASS was recognized at an outpatient surgical center and its affiliated hospital in December 2002. Medical records of patients who underwent cataract surgery during the outbreak were reviewed, and surgical team members who participated in the operations were interviewed. Potential causes of TASS were identified and eliminated. Feedwater from autoclave steam generators and steam condensates were analyzed by use of spectroscopy and ion chromatography. During the outbreak, 8 (38%) of 21 cataract operations were complicated by TASS, compared with 2 (0.07%) of 2,713 operations performed from January 1996 through November 2002. Results of an initial investigation suggested that cataract surgical equipment may have been contaminated by suboptimal equipment reprocessing or as a result of personnel changes. The frequency of TASS decreased (1 of 44 cataract operations) after reassignment of personnel and revision of equipment reprocessing procedures. Further investigation identified the presence of impurities (eg, sulfates, copper, zinc, nickel, and silica) in autoclave steam moisture, which was attributed to improper maintenance of the autoclave steam generator in the outpatient surgical center. When impurities in autoclave steam moisture were eliminated, no cases of TASS were observed after more than 1,000 cataract operations. Suboptimal reprocessing of cataract surgical equipment may evolve over time in busy, multidisciplinary surgical centers. Clinically significant contamination of surgical equipment may result from inappropriate maintenance of steam sterilization systems. Standardization of protocols for reprocessing of cataract surgical equipment may prevent outbreaks of TASS and may be of assistance during outbreak investigations.
49 CFR 1549.101 - Acceptance, screening, and transfer of cargo.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY CERTIFIED CARGO SCREENING PROGRAM Operations § 1549.101 Acceptance, screening, and transfer of cargo. (a) Preventing or... facilities, equipment, and procedures described in its security program to prevent or deter the carriage...
Amperometric Determination of Glucose at Parts per Million Levels with Immobilized Glucose Oxidase.
ERIC Educational Resources Information Center
Sittampalam, G.; Wilson, G. S.
1982-01-01
An experiment on the operation and utility of an amperometric immobilized enzyme electrode (or probe) is described, including advantages of the experiment, equipment, reagents, preparation of phosphate buffer, enzyme immobilization techniques, laboratory procedures, precautions, and discussion of experimental results. (SK)
Nonlinear Circuit Concepts -- An Elementary Experiment.
ERIC Educational Resources Information Center
Matolyak, J.; And Others
1983-01-01
Describes equipment and procedures for an experiment using diodes to introduce non-linear electronic devices in a freshman physics laboratory. The experiment involves calculation and plotting of the characteristic-curve and load-line to predict the operating point and compare prediction to experimentally determined values. Background information…
33 CFR 127.017 - Alternatives.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Alternatives. 127.017 Section 127... General § 127.017 Alternatives. (a) The COTP may allow alternative procedures, methods, or equipment... written request for the alternative at least 30 days before facility operations under the alternative...
A European Navy: Can it Complete European Political and Economic Integration?
2012-06-01
would enjoy a comprehensive and complete defense structure, perhaps even more effective and cost-efficient than is possible with the current lineup ...malfunctions or operator error. A unified and unifying European Navy would standardize basic equipment and procedures , facilitating effective exercises
40 CFR 1065.920 - PEMS Calibrations and verifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... verification. The verification consists of operating an engine over a duty cycle in the laboratory and... by laboratory equipment as follows: (1) Mount an engine on a dynamometer for laboratory testing...
Making Our Buildings Safer: Security Management and Equipment Issues.
ERIC Educational Resources Information Center
Clark, James H.
1997-01-01
Discusses three major components of library security: physical security of the environment; operating procedures for library staff, the public, and security personnel; and a contract security force (or campus security in academic institutions.) Topics include risk management; maintenance; appropriate technology, including security systems and…
NASA Technical Reports Server (NTRS)
Baxley, B.; Williams, D.; Consiglio, M.; Conway, S.; Adams, C.; Abbott, T.
2005-01-01
The ability to conduct concurrent, multiple aircraft operations in poor weather, at virtually any airport, offers an important opportunity for a significant increase in the rate of flight operations, a major improvement in passenger convenience, and the potential to foster growth of charter operations at small airports. The Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept is designed to increase traffic flow at any of the 3400 nonradar, non-towered airports in the United States where operations are currently restricted to one-in/one-out procedural separation during Instrument Meteorological Conditions (IMC). The concept's key feature is pilots maintain their own separation from other aircraft using procedures, aircraft flight data sent via air-to-air datalink, cockpit displays, and on-board software. This is done within the Self-Controlled Area (SCA), an area of flight operations established during poor visibility or low ceilings around an airport without Air Traffic Control (ATC) services. The research described in this paper expands the HVO concept to include most off-nominal situations that could be expected to occur in a future SATS environment. The situations were categorized into routine off-nominal operations, procedural deviations, equipment malfunctions, and aircraft emergencies. The combination of normal and off-nominal HVO procedures provides evidence for an operational concept that is safe, requires little ground infrastructure, and enables concurrent flight operations in poor weather.
Small Aircraft Transportation System, Higher Volume Operations Concept: Off-Nominal Operations
NASA Technical Reports Server (NTRS)
Abbott, Terence S.; Consiglio, Maria C.; Baxley, Brian T.; Williams, Daniel M.; Conway, Sheila R.
2005-01-01
This document expands the Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept to include off-nominal conditions. The general philosophy underlying the HVO concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA). During periods of poor weather, a block of airspace would be established around designated non-towered, non-radar airports. Aircraft flying enroute to a SATS airport would be on a standard instrument flight rules flight clearance with Air Traffic Control providing separation services. Within the SCA, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Previous work developed the procedures for normal HVO operations. This document provides details for off-nominal and emergency procedures for situations that could be expected to occur in a future SCA.
Sciahbasi, Alessandro; Calabrò, Paolo; Sarandrea, Alessandro; Rigattieri, Stefano; Tomassini, Francesco; Sardella, Gennaro; Zavalloni, Dennis; Cortese, Bernardo; Limbruno, Ugo; Tebaldi, Matteo; Gagnor, Andrea; Rubartelli, Paolo; Zingarelli, Antonio; Valgimigli, Marco
2014-06-01
Radiation absorbed by interventional cardiologists is a frequently under-evaluated important issue. Aim is to compare radiation dose absorbed by interventional cardiologists during percutaneous coronary procedures for acute coronary syndromes comparing transradial and transfemoral access. The randomized multicentre MATRIX (Minimizing Adverse Haemorrhagic Events by TRansradial Access Site and Systemic Implementation of angioX) trial has been designed to compare the clinical outcome of patients with acute coronary syndromes treated invasively according to the access site (transfemoral vs. transradial) and to the anticoagulant therapy (bivalirudin vs. heparin). Selected experienced interventional cardiologists involved in this study have been equipped with dedicated thermoluminescent dosimeters to evaluate the radiation dose absorbed during transfemoral or right transradial or left transradial access. For each access we evaluate the radiation dose absorbed at wrist, at thorax and at eye level. Consequently the operator is equipped with three sets (transfemoral, right transradial or left transradial access) of three different dosimeters (wrist, thorax and eye dosimeter). Primary end-point of the study is the procedural radiation dose absorbed by operators at thorax. An important secondary end-point is the procedural radiation dose absorbed by operators comparing the right or left radial approach. Patient randomization is performed according to the MATRIX protocol for the femoral or radial approach. A further randomization for the radial approach is performed to compare right and left transradial access. The RAD-MATRIX study will probably consent to clarify the radiation issue for interventional cardiologist comparing transradial and transfemoral access in the setting of acute coronary syndromes. Copyright © 2014 Elsevier Inc. All rights reserved.
Lewis hybrid computing system, users manual
NASA Technical Reports Server (NTRS)
Bruton, W. M.; Cwynar, D. S.
1979-01-01
The Lewis Research Center's Hybrid Simulation Lab contains a collection of analog, digital, and hybrid (combined analog and digital) computing equipment suitable for the dynamic simulation and analysis of complex systems. This report is intended as a guide to users of these computing systems. The report describes the available equipment' and outlines procedures for its use. Particular is given to the operation of the PACER 100 digital processor. System software to accomplish the usual digital tasks such as compiling, editing, etc. and Lewis-developed special purpose software are described.
Sardiwalla, Yaeesh; Jufas, Nicholas; Morris, David P
2017-06-12
Minimally Invasive Ponto Surgery (MIPS) was recently described as a new technique to facilitate the placement of percutaneous bone anchored hearing devices. The procedure has resulted in a simplification of the surgical steps and a dramatic reduction in surgical time while maintaining excellent patient outcomes. Given these developments, our group sought to move the procedure from the main operating suite where they have traditionally been performed. This study aims to test the null hypothesis that MIPS and open approaches have the same direct costs for the implantation of percutaneous bone anchored hearing devices in a Canadian public hospital setting. A retrospective direct cost comparison of MIPS and open approaches for the implantation of bone conduction implants was conducted. Indirect and future costs were not included in the fiscal analysis. A simple cost comparison of the two approaches was made considering time, staff and equipment needs. All 12 operations were performed on adult patients from 2013 to 2016 by the same surgeon at a single hospital site. MIPS has a total mean reduction in cost of CAD$456.83 per operation from the hospital perspective when compared to open approaches. The average duration of the MIPS operation was 7 min, which is on average 61 min shorter compared with open approaches. The MIPS technique was more cost effective than traditional open approaches. This primarily reflects a direct consequence of a reduction in surgical time, with further contributions from reduced staffing and equipment costs. This simple, quick intervention proved to be feasible when performed outside the main operating room. A blister pack of required equipment could prove convenient and further reduce costs.
NASA Astrophysics Data System (ADS)
Kishkovich, Oleg P.; Bolgov, Dennis; Goodwin, William
1999-06-01
In this paper, the authors discuss the requirements for chemical air filtration system used in conjunction with modern DUV photolithography equipment. Among the topics addressed are the scope of pollutants, their respective internal and external sources, and an overview of different types of filtration technologies currently in use. Key filtration parameters, including removal efficiency, service life, and spill protection capacity, are discussed and supported by actual data, reflection the total molecular base concentration in operational IC manufacturing facilities. The authors also describe a time-accelerated testing procedure for comparing and evaluating different filtration technologies and designs, and demonstrate how this three-day test procedure can reliably predict an effective filter service life up to ten years.
Reißhauer, A; Liebl, M E
2012-07-01
Standards for what should be available in terms of equipment and services in a department of physical medicine caring for acute inpatients do not exist in Germany. The profile of a department determines the therapeutic services it focuses on and hence the technical facilities required. The German catalogue of operations and procedures defines minimum thresholds for treatment. In the opinion of the authors a department caring for inpatients with acute rheumatic diseases must, as a minimum, have the facilities and equipment necessary for offering thermotherapeutic treatment. Staff trained in physical therapeutic procedures and occupational therapy is also crucial. Moreover, it is desirable that the staff should be trained in manual therapy.
Hybrid procedure for orbital venous malformation in the endovascular operation room.
Cheng, A C O; Li, E Y M; Chan, T C Y; Wong, A C W; Chan, P C M; Poon, W W L; Fung, D H S; Yuen, H K L
2015-08-01
To describe a hybrid procedure for orbital venous malformation in the endovascular operating room (EVOR). Five consecutive patients with venous malformation in the periocular and orbital region were included. All patients received a one-stage direct puncture venogram, image-guided glue injection, and surgical resection in the EVOR equipped with a biplane digital subtraction angiography system (BDSAS). The mean age at the time of operation was 37.4 years (range, 22-69 years). The mean operative time was 193 min (range, 138-324 min). No intraoperative complications were noted. The mean follow-up duration was 18.8 months (range, 10-24 months). Three patients had complete removal of the vascular lesions. At the latest follow-up, no recurrence of symptoms related to the lesions was noted. All patients had an uneventful recovery and satisfactory outcome. The hybrid procedure of orbital venous malformation in the EVOR is a novel application in ophthalmology. It is a safe and well-controlled procedure with real-time high-quality BDSAS surveillance to facilitate surgical resection. Its success requires collaboration between the interventional radiologist, the surgeon, and the ophthalmologist.
Hearns, S; Shirley, P J
2006-01-01
Retrieval and transfer of critically ill and injured patients is a high risk activity. Risk can be minimised with robust safety and clinical governance systems in place. This article describes the various governance systems that can be employed to optimise safety and efficiency in retrieval services. These include operating procedure development, equipment management, communications procedures, crew resource management, significant event analysis, audit and training. PMID:17130608
Predicate Argument Structure Frames for Modeling Information in Operative Notes
Wang, Yan; Pakhomov, Serguei; Melton, Genevieve B.
2015-01-01
The rich information about surgical procedures contained in operative notes is a valuable data source for improving the clinical evidence base and clinical research. In this study, we propose a set of Predicate Argument Structure (PAS) frames for surgical action verbs to assist in the creation of an information extraction (IE) system to automatically extract details about the techniques, equipment, and operative steps from operative notes. We created PropBank style PAS frames for the 30 top surgical action verbs based on examination of randomly selected sample sentences from 3,000 Laparoscopic Cholecystectomy notes. To assess completeness of the PAS frames to represent usage of same action verbs, we evaluated the PAS frames created on sample sentences from operative notes of 6 other gastrointestinal surgical procedures. Our results showed that the PAS frames created with one type of surgery can successfully denote the usage of the same verbs in operative notes of broader surgical categories. PMID:23920664
NASA Technical Reports Server (NTRS)
Callantine, Todd J.; Cabrall, Christopher; Kupfer, Michael; Omar, Faisal G.; Prevot, Thomas
2012-01-01
NASA?s Air Traffic Management Demonstration-1 (ATD-1) is a multi-year effort to demonstrate high-throughput, fuel-efficient arrivals at a major U.S. airport using NASA-developed scheduling automation, controller decision-support tools, and ADS-B-enabled Flight-Deck Interval Management (FIM) avionics. First-year accomplishments include the development of a concept of operations for managing scheduled arrivals flying Optimized Profile Descents with equipped aircraft conducting FIM operations, and the integration of laboratory prototypes of the core ATD-1 technologies. Following each integration phase, a human-in-the-loop simulation was conducted to evaluate and refine controller tools, procedures, and clearance phraseology. From a ground-side perspective, the results indicate the concept is viable and the operations are safe and acceptable. Additional training is required for smooth operations that yield notable benefits, particularly in the areas of FIM operations and clearance phraseology.
NASA Astrophysics Data System (ADS)
Starikov, A. I.; Nekrasov, R. Yu; Teploukhov, O. J.; Soloviev, I. V.; Narikov, K. A.
2016-10-01
Manufactures, machinery and equipment improve of constructively as science advances and technology, and requirements are improving of quality and longevity. That is, the requirements for surface quality and precision manufacturing, oil and gas equipment parts are constantly increasing. Production of oil and gas engineering products on modern machine tools with computer numerical control - is a complex synthesis of technical and electrical equipment parts, as well as the processing procedure. Technical machine part wears during operation and in the electrical part are accumulated mathematical errors. Thus, the above-mentioned disadvantages of any of the following parts of metalworking equipment affect the manufacturing process of products in general, and as a result lead to the flaw.
Controlling hazardous energy sources (lockout/tagout)
NASA Technical Reports Server (NTRS)
Dominguez, Manuel B.
1991-01-01
The minimum requirements as established by the Occupational Safety and Health Administration (OSHA) standard 29 CFR 1910.147 are discussed for preventing the unexpected operation of equipment or release of energy which could cause injury to personnel, damage to equipment, harm to the environment, or loss or compromise of test data. Safety requirements both for government and contractor personnel are explained for potentially hazardous energy sources during work operations at LeRC (Cleveland and Plum Brook Stations). Basic rules are presented to ensure protection against harmful exposures, and baseline implementation requirements are discussed from which detailed lockout/tagout procedures can be developed for individual equipment items. Examples of energy sources covered by this document include electrical, pneumatic, mechanical, chemical, cryogenic, thermal, spring tension/compression suspended or moving loads, and other potentially hazardous sources. Activities covered by this standard include, but are not limited to, construction, maintenance, installation, calibration, inspection, cleaning, or repair.
Controlling hazardous energy sources (lockout/tagout)
NASA Astrophysics Data System (ADS)
Dominguez, Manuel B.
1991-10-01
The minimum requirements as established by the Occupational Safety and Health Administration (OSHA) standard 29 CFR 1910.147 are discussed for preventing the unexpected operation of equipment or release of energy which could cause injury to personnel, damage to equipment, harm to the environment, or loss or compromise of test data. Safety requirements both for government and contractor personnel are explained for potentially hazardous energy sources during work operations at LeRC (Cleveland and Plum Brook Stations). Basic rules are presented to ensure protection against harmful exposures, and baseline implementation requirements are discussed from which detailed lockout/tagout procedures can be developed for individual equipment items. Examples of energy sources covered by this document include electrical, pneumatic, mechanical, chemical, cryogenic, thermal, spring tension/compression suspended or moving loads, and other potentially hazardous sources. Activities covered by this standard include, but are not limited to, construction, maintenance, installation, calibration, inspection, cleaning, or repair.
Load drop evaluation for TWRS FSAR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Julyk, L.J.; Ralston, G.L.
1996-09-30
Operational or remediation activities associated with existing underground high-level waste storage tank structures at the Hanford Site often require the installation/removal of various equipment items. To gain tank access for installation or removal of this equipment, large concrete cover blocks must be removed and reinstalled in existing concrete pits above the tanks. An accidental drop of the equipment or cover blocks while being moved over the tanks that results in the release of contaminants to the air poses a potential risk to onsite workers or to the offsite public. To minimize this potential risk, the use of critical lift hoistingmore » and rigging procedures and restrictions on lift height are being considered during development of the new tank farm Basis for Interim Operation and Final Safety Analysis Report. The analysis contained herein provides information for selecting the appropriate lift height restrictions for these activities.« less
21 CFR 111.25 - What are the requirements under this subpart D for written procedures?
Code of Federal Regulations, 2012 CFR
2012-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Equipment and Utensils § 111... dietary supplement; (b) Calibrating, inspecting, and checking automated, mechanical, and electronic... other contact surfaces that are used to manufacture, package, label, or hold components or dietary...
21 CFR 111.25 - What are the requirements under this subpart D for written procedures?
Code of Federal Regulations, 2014 CFR
2014-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Equipment and Utensils § 111... dietary supplement; (b) Calibrating, inspecting, and checking automated, mechanical, and electronic... other contact surfaces that are used to manufacture, package, label, or hold components or dietary...
Olivas uses communication equipment on the FD during Joint Operations
2007-06-13
S117-E-07194 (13 June 2007) --- Astronaut John "Danny" Olivas, STS-117 mission specialist, uses a communication system while looking over procedures checklists on the flight deck of Space Shuttle Atlantis during flight day six activities while docked with the International Space Station.
Olivas uses communication equipment on the FD during Joint Operations
2007-06-13
S117-E-07192 (13 June 2007) --- Astronaut John "Danny" Olivas, STS-117 mission specialist, uses a communication system while looking over procedures checklists on the flight deck of Space Shuttle Atlantis during flight day six activities while docked with the International Space Station.
30 CFR 282.27 - Conduct of operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... technologies, techniques, procedures, equipment, or activities. (c) The lessee shall immediately notify the... acceptable to the Director before penetrating more than 500 feet unless a different depth is specified in... payment of the royalty specified in the lease to the United States. (j) Installations and structures.(1...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
... describes: Standard operating procedures for using hazardous chemicals; hazard-control techniques; equipment...] Occupational Exposure to Hazardous Chemicals in Laboratories Standard; Extension of the Office of Management... collection requirements specified in the Standard on Occupational Exposure to Hazardous Chemicals in...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-16
... consumer protection, the Agency issued GLP regulations. The regulations specify minimum standards for the proper conduct of safety testing and contain sections on facilities, personnel, equipment, standard operating procedures (SOPs), test and control articles, quality assurance, protocol and conduct of a safety...
TREATMENT PLANT EVALUATION DURING A WATERBORNE OUTBREAK
If a waterborne disease outbreak is the result of problems at a treatment plant, a thorough and careful evaluation of both process equipment and operating procedures would be needed. his evaluation should be done in a series of actions. hese actions are explained in this paper. h...
40 CFR 63.6120 - What performance tests and other procedures must I use?
Code of Federal Regulations, 2010 CFR
2010-07-01
... parameters associated with operation of the stationary combustion turbine and any emission control device... CATEGORIES National Emission Standards for Hazardous Air Pollutants for Stationary Combustion Turbines... your stationary combustion turbine is not equipped with an oxidation catalyst, you must petition the...
30 CFR 57.14214 - Train warnings.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Train warnings. 57.14214 Section 57.14214 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Practices and Operational Procedures § 57.14214 Train warnings. A warning that is audible...
30 CFR 57.14214 - Train warnings.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Train warnings. 57.14214 Section 57.14214 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Practices and Operational Procedures § 57.14214 Train warnings. A warning that is audible...
30 CFR 57.14214 - Train warnings.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Train warnings. 57.14214 Section 57.14214 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Practices and Operational Procedures § 57.14214 Train warnings. A warning that is audible...
30 CFR 57.14214 - Train warnings.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Train warnings. 57.14214 Section 57.14214 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Practices and Operational Procedures § 57.14214 Train warnings. A warning that is audible...
30 CFR 57.14214 - Train warnings.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Train warnings. 57.14214 Section 57.14214 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Practices and Operational Procedures § 57.14214 Train warnings. A warning that is audible...
NASA Technical Reports Server (NTRS)
Miller, L.
1980-01-01
A facility which produces electrodes for spacecraft power supplies is described. The electrode assembly procedures are discussed. A number of design features in the production process are reported including a batch operation mode and an independent equipment module design approach for transfering the electrode materials from process tank to process tank.
ERIC Educational Resources Information Center
Air Univ., Gunter AFS, Ala. Extension Course Inst.
This student text is designed for use by Air Force personnel enrolled in a self-study extension course for meat cutters. Covered in the individual chapters are careers in meat processing, operation and maintenance of meat cutting equipment, receipt and storage, procedures for processing and preparing meats, techniques for wrapping and pricing…
[Efficacy and limits of the bariatric surgery].
Nicolai, Albano; Taus, Marina; Busni, Debora; Petrelli, Massimiliano
2005-01-01
Morbid obesity is associated with and increased risk of serious comorbidities, including type 2 diabetes, sleep apnoea, cardiovascular diseases, and orthopedic disabilities. Not operative treatments for superobese patients have not been shown to produce reliable long-term benefits, therefore surgical therapy has became the treatment of choice. The number of surgical procedures increased in the last year confirm these data. However, before recommended a specific surgical procedures to a superobese patients it is necessary to consider some variables, such as: patient, health structure, and multidisciplinary equipe. Since there are not recommended or condemned surgical procedures, in this paper the Authors tried to evaluate the effectiveness and limits of the most performed surgical procedures for the treatment of pathologic obesity: gastric by-pass, biliopancreatic diversion (duodenal switch), vertical gastroplasty, banding gastric. The Authors used some pointer of outcome to measure effectiveness and limits: five year post-operative percentage excess weight loss >/< 50, peri-operative >/< 1%, early and late complications >/< 15%, reoperation >/< 3%, improvement of quality of life. Thanks to new surgical technique, restrictive options are losing ground, while malabsorbitive bariatric procedures are collecting successful.
Bulk transmission system component outage data base. Research project 1283-1. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Albrecht, P.F.; Heising, C.R.; Patton, A.D.
1981-04-01
This project is responsive to the premise that the successful analysis of equipment reliability and system adequacy in bulk transmission system planning and system operations requires data on equipment failure rates, maintenance outage rates and repair times. The objective of the project is to develop a system of consistent definitions, formats and procedures which can be used in the collection of such data in a well designed outage data bank. The project consisted of four interrelated phases, beginning with a review of related work and problem definition and ending with a discussion of data base organization and management. The reviewmore » of related work quickly pointed out that two schools of thought exist on data collection. One group contends that data should be collected on bulk transmission system physical equipments, such as transformers, circuit breakers, etc., and the other group supports data collection on functional transmission lines, including the terminal equipment, which have been defined as transmission units in this report. A compromise between these two approaches was imperative for successful completion of the work. The second phase investigated the data needed for reliability evaluation. The applications of the data bank were enumerated leading to a list of basic data needed when recording an incident. Phase 3 concentrated on developing procedures for data collection using forms to collect data both on outages and on the equipment design. Finally, the aspects of data base organization and management were explored and general recommendations made appropriate to this specific application. The project did not succeed in completely defining the procedures, particularly for multiple outages, but the ground work has been laid for a pilot data collection effort to refine the procedures before wide scale implementation by the utility industry.« less
Safety assessment for EPS electron-proton spectrometer
NASA Technical Reports Server (NTRS)
Gleeson, P.
1971-01-01
A safety analysis was conducted to identify the efforts required to assure relatively hazard free operation of the EPS and to meet the safety requirements of the program. Safety engineering criteria, principles, and techniques in applicable disciplines are stressed in the performance of the system and subsystem studies; in test planning; in the design, development, test, evaluation, and checkout of the equipment; and the operating procedures for the EPS program.
1980-12-01
type of personnel likely to he using them, (3) the physical environment , (4) health and operational safety considerations. Carefully selected portable...operated apparatus must have the battery and energy-limiting components located outside the hazardous environment , and be so constructed that a direct...designate effect on equipment or personnel), based upon the most severe result of personnel error, procedural deficiencies, environment , design
Launch Vehicle Operations Simulator
NASA Technical Reports Server (NTRS)
Blackledge, J. W.
1974-01-01
The Saturn Launch Vehicle Operations Simulator (LVOS) was developed for NASA at Kennedy Space Center. LVOS simulates the Saturn launch vehicle and its ground support equipment. The simulator was intended primarily to be used as a launch crew trainer but it is also being used for test procedure and software validation. A NASA/contractor team of engineers and programmers implemented the simulator after the Apollo XI lunar landing during the low activity periods between launches.
40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 20 2013-07-01 2013-07-01 false Aging Bench Equipment and Procedures.... 86, App. VIII Appendix VIII to Part 86—Aging Bench Equipment and Procedures This appendix provides specifications for standard aging bench equipment and aging procedures which may be used to conduct bench aging...
40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Aging Bench Equipment and Procedures.... VIII Appendix VIII to Part 86—Aging Bench Equipment and Procedures This appendix provides specifications for standard aging bench equipment and aging procedures which may be used to conduct bench aging...
40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Aging Bench Equipment and Procedures.... 86, App. VIII Appendix VIII to Part 86—Aging Bench Equipment and Procedures This appendix provides specifications for standard aging bench equipment and aging procedures which may be used to conduct bench aging...
Occupational dose constraints in interventional cardiology procedures: the DIMOND approach
NASA Astrophysics Data System (ADS)
Tsapaki, Virginia; Kottou, Sophia; Vano, Eliseo; Komppa, Tuomo; Padovani, Renato; Dowling, Annita; Molfetas, Michael; Neofotistou, Vassiliki
2004-03-01
Radiation fields involved in angiographic suites are most uneven with intensity and gradient varying widely with projection geometry. The European Commission DIMOND III project addressed among others, the issues regarding optimization of staff doses with an attempt to propose preliminary occupational dose constraints. Two thermoluminescent dosemeters (TLD) were used to assess operators' extremity doses (left shoulder and left foot) during 20 coronary angiographies (CAs) and 20 percutaneous transluminal coronary angioplasties (PTCAs) in five European centres. X-ray equipment, radiation protection measures used and the dose delivered to the patient in terms of dose-area product (DAP) were recorded so as to subsequently associate them with operator's dose. The range of staff doses noted for the same TLD position, centre and procedure type emphasizes the importance of protective measures and technical characteristics of x-ray equipment. Correlation of patient's DAP with staff shoulder dose is moderate whereas correlation of patient's DAP with staff foot dose is poor in both CA and PTCA. Therefore, it is difficult to predict operator's dose from patient's DAP mainly due to the different use of protective measures. A preliminary occupational dose constraint value was defined by calculating cardiologists' annual effective dose and found to be 0.6 mSv.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fisher, R; Wunderle, K; Lingenfelter, M
Purpose: Transitioning from a paper based to an online system for tracking fluoroscopic case information required by state regulation and to conform to NCRP patient dose tracking suggestions. Methods: State regulations require documentation of operator, equipment, and some metric of tube output for fluoroscopy exams. This information was previously collected in paper logs, which was cumbersome and inefficient for the large number of fluoroscopic units across multiple locations within the system. The “tech notes” feature within Siemens’ Syngo workflow RIS was utilized to create an entry form for technologists to input case information, which was sent to a third partymore » vendor for archiving and display though an online web based portal. Results: Over 55k cases were logged in the first year of implementation, with approximately 6,500 cases per month once fully online. A system was built for area managers to oversee and correct data, which has increased the accuracy of inputted values. A high-dose report was built to automatically send notifications when patients exceed trigger levels. In addition to meeting regulatory requirements, the new system allows for larger scale QC in fluoroscopic cases by allowing comparison of data from specific procedures, locations, equipment, and operators so that instances that fall outside of reference levels can be identified for further evaluation. The system has also drastically improved identification of operators without documented equipment specific training. Conclusion: The transition to online fluoroscopy logs has improved efficiency in meeting state regulatory requirements as well as allowed for identification of particular procedures, equipment, and operators in need of additional attention in order to optimize patient and personnel doses, while high dose alerts improve patient care and follow up. Future efforts are focused on incorporating case information from outside of radiology, as well as on automating processes for increased efficiencies.« less
Applying lessons learned to enhance human performance and reduce human error for ISS operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, W.R.
1999-01-01
A major component of reliability, safety, and mission success for space missions is ensuring that the humans involved (flight crew, ground crew, mission control, etc.) perform their tasks and functions as required. This includes compliance with training and procedures during normal conditions, and successful compensation when malfunctions or unexpected conditions occur. A very significant issue that affects human performance in space flight is human error. Human errors can invalidate carefully designed equipment and procedures. If certain errors combine with equipment failures or design flaws, mission failure or loss of life can occur. The control of human error during operation ofmore » the International Space Station (ISS) will be critical to the overall success of the program. As experience from Mir operations has shown, human performance plays a vital role in the success or failure of long duration space missions. The Department of Energy{close_quote}s Idaho National Engineering and Environmental Laboratory (INEEL) is developing a systematic approach to enhance human performance and reduce human errors for ISS operations. This approach is based on the systematic identification and evaluation of lessons learned from past space missions such as Mir to enhance the design and operation of ISS. This paper will describe previous INEEL research on human error sponsored by NASA and how it can be applied to enhance human reliability for ISS. {copyright} {ital 1999 American Institute of Physics.}« less
Applying lessons learned to enhance human performance and reduce human error for ISS operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, W.R.
1998-09-01
A major component of reliability, safety, and mission success for space missions is ensuring that the humans involved (flight crew, ground crew, mission control, etc.) perform their tasks and functions as required. This includes compliance with training and procedures during normal conditions, and successful compensation when malfunctions or unexpected conditions occur. A very significant issue that affects human performance in space flight is human error. Human errors can invalidate carefully designed equipment and procedures. If certain errors combine with equipment failures or design flaws, mission failure or loss of life can occur. The control of human error during operation ofmore » the International Space Station (ISS) will be critical to the overall success of the program. As experience from Mir operations has shown, human performance plays a vital role in the success or failure of long duration space missions. The Department of Energy`s Idaho National Engineering and Environmental Laboratory (INEEL) is developed a systematic approach to enhance human performance and reduce human errors for ISS operations. This approach is based on the systematic identification and evaluation of lessons learned from past space missions such as Mir to enhance the design and operation of ISS. This paper describes previous INEEL research on human error sponsored by NASA and how it can be applied to enhance human reliability for ISS.« less
14 CFR 33.5 - Instruction manual for installing and operating the engine.
Code of Federal Regulations, 2013 CFR
2013-01-01
... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...
14 CFR 33.5 - Instruction manual for installing and operating the engine.
Code of Federal Regulations, 2014 CFR
2014-01-01
... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...
14 CFR 33.5 - Instruction manual for installing and operating the engine.
Code of Federal Regulations, 2011 CFR
2011-01-01
... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...
14 CFR 33.5 - Instruction manual for installing and operating the engine.
Code of Federal Regulations, 2012 CFR
2012-01-01
... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...
14 CFR 33.5 - Instruction manual for installing and operating the engine.
Code of Federal Regulations, 2010 CFR
2010-01-01
... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...
Cost Accounting: Production and Equipment Services.
ERIC Educational Resources Information Center
Schmid, William T.
Cost accounting for audiovisual productions should include direct costs, and, in some cases, the media administrator may have to calculate a per-hour surcharge for general operating overhead as well. Such procedures enable the administrator to determine cost effectiveness, to control cost overruns, and to generate more staff efficiency. Cost…
Advanced EVA system design requirements study, executive summary
NASA Technical Reports Server (NTRS)
1986-01-01
Design requirements and criteria for the space station advanced Extravehicular Activity System (EVAS) including crew enclosures, portable life support systems, maneuvering propulsion systems, and related EVA support equipment were established. The EVA mission requirements, environments, and medical and physiological requirements, as well as operational, procedures and training issues were considered.
33 CFR 155.810 - Tank vessel security.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tank vessel security. 155.810..., Procedures, Equipment, and Records § 155.810 Tank vessel security. Operators of tank vessels carrying more oil cargo residue than normal in any cargo tank must assign a surveillance person or persons...
33 CFR 155.810 - Tank vessel security.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Tank vessel security. 155.810..., Procedures, Equipment, and Records § 155.810 Tank vessel security. Operators of tank vessels carrying more oil cargo residue than normal in any cargo tank must assign a surveillance person or persons...
Method and apparatus of a portable imaging-based measurement with self calibration
Chang, Tzyy-Shuh [Ann Arbor, MI; Huang, Hsun-Hau [Ann Arbor, MI
2012-07-31
A portable imaging-based measurement device is developed to perform 2D projection based measurements on an object that is difficult or dangerous to access. This device is equipped with self calibration capability and built-in operating procedures to ensure proper imaging based measurement.
30 CFR 57.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Coupling or uncoupling cars. 57.14215 Section... and Equipment Safety Practices and Operational Procedures § 57.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then...
30 CFR 57.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Coupling or uncoupling cars. 57.14215 Section... and Equipment Safety Practices and Operational Procedures § 57.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
30 CFR 57.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Coupling or uncoupling cars. 57.14215 Section... and Equipment Safety Practices and Operational Procedures § 57.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then...
30 CFR 57.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Coupling or uncoupling cars. 57.14215 Section... and Equipment Safety Practices and Operational Procedures § 57.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then...
30 CFR 57.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Coupling or uncoupling cars. 57.14215 Section... and Equipment Safety Practices and Operational Procedures § 57.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then...
30 CFR 56.14215 - Coupling or uncoupling cars.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Coupling or uncoupling cars. 56.14215 Section... Equipment Safety Practices and Operational Procedures § 56.14215 Coupling or uncoupling cars. Prior to coupling or uncoupling cars manually, trains shall be brought to a complete stop, and then moved at minimum...
47 CFR 24.2 - Other applicable rule parts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... procedures concerning the marketing and importation of radio frequency devices, and for obtaining equipment... conditions relating to the marketing of part 15 devices. Unlicensed PCS devices operate under subpart D of... towers. (g) Part 20 of this chapter governs commercial mobile radio services. (h) Part 21. This part...
36 CFR 1254.90 - What is the scope of this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... the use of privately owned microfilm equipment to film accessioned archival records and donated... permission from the originating agency to film those records (see § 1253.4). For information about procedures for obtaining permission from the originating agency to film records in the records center operation...
36 CFR 1254.90 - What is the scope of this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... the use of privately owned microfilm equipment to film accessioned archival records and donated... permission from the originating agency to film those records (see § 1253.4). For information about procedures for obtaining permission from the originating agency to film records in the records center operation...
Sanitation & Safety for Child Feeding Programs.
ERIC Educational Resources Information Center
Florida State Dept. of Health and Rehabilitative Services, Tallahassee.
In the interest of promoting good health, sanitation, and safety practices in the operation of child feeding programs, this bulletin discusses practices in personal grooming and wearing apparel; the purchasing, storage, handling, and serving of food; sanitizing equipment and utensils; procedures to follow in case of a food poisoning outbreak; some…
40 CFR 63.467 - Recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...
40 CFR 63.467 - Recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...
40 CFR 63.467 - Recordkeeping requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...
40 CFR 63.467 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., and sterilization. (1) All equipment that comes in contact with embryos or with media used for their... found to be intact and free from any adherent material. (5) After washing and examination of the zona... be moved to a U.S. Department of Agriculture-operated animal import center in either New York, Hawaii...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., and sterilization. (1) All equipment that comes in contact with embryos or with media used for their... found to be intact and free from any adherent material. (5) After washing and examination of the zona... be moved to a U.S. Department of Agriculture-operated animal import center in either New York, Hawaii...
30 CFR 56.14208 - Warning devices.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Warning devices. 56.14208 Section 56.14208... Safety Practices and Operational Procedures § 56.14208 Warning devices. (a) Visible warning devices shall... feet beyond the rear of the equipment shall have a warning flag at the end of the projection. Under...
30 CFR 56.14208 - Warning devices.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warning devices. 56.14208 Section 56.14208... Safety Practices and Operational Procedures § 56.14208 Warning devices. (a) Visible warning devices shall... feet beyond the rear of the equipment shall have a warning flag at the end of the projection. Under...
30 CFR 56.14208 - Warning devices.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Warning devices. 56.14208 Section 56.14208... Safety Practices and Operational Procedures § 56.14208 Warning devices. (a) Visible warning devices shall... feet beyond the rear of the equipment shall have a warning flag at the end of the projection. Under...
30 CFR 56.14208 - Warning devices.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Warning devices. 56.14208 Section 56.14208... Safety Practices and Operational Procedures § 56.14208 Warning devices. (a) Visible warning devices shall... feet beyond the rear of the equipment shall have a warning flag at the end of the projection. Under...
30 CFR 56.14208 - Warning devices.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warning devices. 56.14208 Section 56.14208... Safety Practices and Operational Procedures § 56.14208 Warning devices. (a) Visible warning devices shall... feet beyond the rear of the equipment shall have a warning flag at the end of the projection. Under...
40 CFR 63.695 - Inspection and monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... monitoring procedures required to perform the following: (1) To inspect tank fixed roofs and floating roofs... and floating roof inspection requirements. (1) Owners and operators that use a tank equipped with an internal floating roof in accordance with the provisions of § 63.685(e) of this subpart shall meet the...
Safety in the Chemical Laboratory: Handling of Oxygen in Research Experiments.
ERIC Educational Resources Information Center
Burnett, R. J.; Cole, J. E., Jr.
1985-01-01
Examines some of the considerations involved in setting up a typical oxygen/organic reaction. These considerations (including protection for personnel/equipment, adequate ventilation, reactor design, maximum reactor charge, operating procedures, and others) influence how the reaction is to be conducted and what compromises the scientist must…